HARGA
NO URAIAN PEKERJAAN VOLUME SAT SATUAN JUMLAH
(Rp.) ( Rp.)
I PEKERJJAAN PERSIAPAN
1 Pembersihan Lapangan 81.000 M² 1,500.00 121,500.00
2 Uitzet 36.000 M' 16,800.00 604,800.00
726,300.00
II PEKERJAAN TANAH
1 Galian Tanah 33.600 M³ 42,000.00 1,411,200.00
2 Urugan Tanah 8.400 M³ 12,250.00 102,900.00
3 Tanah Urug 20.250 M³ -
1,514,100.00
III PEKERJAAN PONDASI
1 Pondasi Batu Kali 1 PC : 6 PS 15.780 M³ 556,000.00 8,773,680.00
2 Aanstampeng 7.200 M³ 338,500.00 2,437,200.00
11,210,880.00
IV PEK. BETON BERTULANG Adukan 1:2:3
1 Beton Sloof 33.600 M 71,869.00 2,414,798.40
2 Plat dak atap + teras 9.000 M2 275,202.00 2,476,818.00
3 Beton kolom praktis 80.000 M' 50,907.00 4,072,560.00
4 Beton Balok Lantai+ ring balok 60.600 M' 53,296.00 3,229,737.60
12,193,914.00
V PEKERJAAN DINDING & PLESTERAN
1 Pasangan dinding Bata merah (tasram) 30.000 M² 87,250.00 2,617,500.00
2 Pasangan dinding Bata merah 161.000 M² 81,550.00 13,129,550.00
3 Pasang Kusen 60.700 M' 9,840.00 597,288.00
4 Pasang Roster 10.000 bh 7,500.00 75,000.00
5 Plesteran tembok- acian 332.000 M² 49,200.00 16,334,400.00
32,753,738.00
VI PEKERJAAN ATAP
1 Rangka Atap Baja Ringan 75.504 M² 140,000.00 10,570,560.00
2 Atap Genteng Metal 125.00 Kp 29,500.00 3,687,500.00
3 Nok Genteng Metal 24.00 Kp 13,500.00 324,000.00
4 Screv Genteng 1.00 Ktk 50,000.00 50,000.00
5 Upah Pemasangan Genteng 75.504 M² 6,000.00 453,024.00
6 Upah Pemasangan Lisplank 55.180 M' 3,000.00 165,540.00
15,250,624.00
VII PEKERJAAN LANTAI
1 Urugan Pasir Bawah Lantai 5.135 M³ 129,125.00 663,056.88
2 Floor Lantai adukan 1;3;5 2.568 M² 775,250.00 1,990,842.00
3 Pasangan Lantai Keramik 30x30 44.750 M² 103,617.75 4,636,894.31
4 Pasangan Lantai Keramik 20x20 km mandi 1.800 M² 103,617.75 186,511.95
5 Pasangan Lantai keramik 20x20 teras 4.800 M² 103,617.75 497,365.20
7,974,670.34
VIII PEKERJAAN PENGECATAN
1 Cat Kusen 60.700 M' 17,523.00 1,063,646.10
2 Cat daun pintu 5.000 daun 51,920.00 259,600.00
3 Cat daun jendela 7.000 daun 17,523.00 122,661.00
4 Pengecatan tembok 252 M² 17,940.00 4,520,880.00
5 Cat Plafont 51 M² 17,940.00 914,940.00
6,881,727.10
IX PEKERJAAN KACA dan KUNCI
1 Pasang kunci tanam biasa 5.000 bh 130,000.00 650,000.00
2 Pasang pintu 5.000 daun 70,000.00 350,000.00
3 Daun Boven 2.000 daun 40,615.30 81,230.60
4 Pasang daun jendela, hak angin, gerendel, 7.000 daun 40,615.30 284,307.10
handel 1,365,537.70
REKAPITULASI
Jumlah 97,770,691.14
Dibulatkan 97,770,000.00
TERBILANG :
RAB RUMAH TIPE 65
HARGA
NO URAIAN PEKERJAAN VOLUME SAT SATUAN JUMLAH
(Rp.) ( Rp.)
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi 150.00 2,625.00 393,750.00
2 Pek. Pembuatan dan Pemasangan Bowplank 41.35 48,895.00 2,021,808.25
3 Penyediaan Air Kerja 1.00 100,000.00 100,000.00
2,515,558.25
1 2 3 4 5 6
VII PEKERJAAN ATAP
1 Pek. Pas, Rangka Atap Baja Ringan 104.49 174,890.83 18,274,342.83
2 Pek. Pas, Atap Genteng Metal Berpasir 110.31 125,851.00 13,882,623.81
3 Pek. Pas, Nok Genteng Metal 9.75 116,831.00 1,139,102.25
4 Pek. Pas, Listplank GRC 2 x 20 27.95 43,505.00 1,215,964.75
34,512,033.64
IX PEKERJAAN PENGECATAN
1 Pek. Cat Warna Tembok dan Kolom 305.17 19,769.75 6,033,134.61
2 Pek. Cat Plafon 63.41 19,769.75 1,253,599.85
3 Pek. Cat List Plank 11.18 40,249.00 449,983.82
4 Pek. Cat Kayu 22.84 40,249.00 919,287.16
8,656,005.44
XI PEKERJAAN SANITASI
1 Pek. Pas. Closed Jongkok 1.00 467,250.00 467,250.00
2 Pek. Pas. Closed Jongkok 1.00 467,250.00 467,250.00
3 Pek. Pas. Bak mandi (batubata) 2.00 1,200,000.00 2,400,000.00
4 Pek. Pas. Kran Air 3.00 25,850.00 77,550.00
5 Pek. Pas. Filter Air Kotor 20.47 21,505.00 440,207.35
6 Pek. Pas. Instalasi Air Besih 19.65 13,827.00 271,700.55
7 Pek. Pas. Septictank 1.00 1,000,000.00 1,000,000.00
5,123,957.90
REKAPITULASI
Jumlah 162,500,422.62
Dibulatkan 162,590,000.00
TERBILANG :