IX Atap
1 Rangka Atap Pipa Hitam SCH Diameter 6" m Rp 2,729,000.00
2 Rangka Atap Pipa Hitam SCH Diameter 4" m Rp 1,560,000.00
3 Angkur Baut bh Rp 70,070.00
4 Gording Baja pcs Rp 77,000.00
5 Penutup Atap UPVC bh Rp 129,000.00
6 Talang m Rp 65,000
X Instalasi Air
1 Kloset Duduk ex. Toto bh Rp 1,200,000.00
2 Floor Drain ex. Toto bh Rp 25,000.00
3 Jet Washer ex. Toto bh Rp 195,000.00
4 Lavatory ex. Toto bh Rp 1,000,000.00
5 Urinoir ex. Toto bh Rp 1,370,000.00
6 Kran Tembok ex. Onda/Wasser bh Rp 62,000.00
7 Pipa PVC uk Ø 1/2" ex. Wavin AW m' Rp 18,000.00
8 Pipa PVC uk Ø 3/4" ex. Wavin AW m' Rp 23,000.00
9 Pipa PVC uk Ø 4" ex. Wavin AW m' Rp 168,000.00
10 Pipa PVC uk Ø 6" ex. Wavin AW m' Rp 294,500.00
11 Pipa PVC uk Ø 2" ex. Wavin AW m' Rp 55,000.00
12 Pipa PVC uk Ø 1" ex. Wavin AW m' Rp 30,000.00
13 Penyambung Pipa PVC ukuran 1/2" bh Rp 2,000.00
14 Penyambung Pipa PVC ukuran 3/4" bh Rp 3,500.00
15 Penyambung Pipa PVC ukuran 2" bh Rp 8,000.00
16 Penyambung Pipa PVC ukuran 4" bh Rp 20,000.00
17 Pompa Air ex. Sanyo bh Rp 1,800,000.00
18 Kran Dinding ex Onda bh Rp 70,000.00
19 Tangkir Air 1500 Liter bh Rp 2,200,000.00
20 Biotect SepticTank bh Rp 39,000,000.00
XI Instalasi Listrik
1 MDP bh Rp 7,000,000.00
2 MCCB bh Rp 1,500,000.00
3 Lampu LED Highbay 100W cooldaylight bh Rp 725,000.00
4 LEDLampu Barret bh Rp 100,000.00
5 Stop Kontak Listrik bh Rp 29,000.00
6 Exhaust fan bh Rp 600,000.00
7 Lampu Downlight Spot LED COB bh Rp 63,000.00
8 Lampu RM 2x36W bh Rp 380,000.00
9 Stop Kontak AC bh Rp 56,000.00
10 Grid Switch bh Rp 425,000.00
11 Lampu TL LED bh Rp 79,000.00
262
I PEKERJAAN PERSIAPAN
1. Pekerjaan Pembersihan Lokasi
Membersihkan 1m² lahan
Uraian SatuanKoefisien Harga satuan Jumlah harga
TENAGA
Mandor OH 0.050 Rp 150,000 Rp 7,500
Perkerja OH 0.100 Rp 100,000 Rp 10,000
JUMLAH Rp 17,500.00
2. Pekerjaan Bowplank
Pengukuran dan pemasangan 1m' bouwplank
Uraian SatuanKoefisien Harga Satuan Jumlah harga
BAHAN
Kaso 5/7 m³ 0.012 Rp 3,500,000 Rp 42,000
Paku Biasa kg 0.020 Rp 19,000 Rp 380
Kayu Papan 3/20 m³ 0.007 Rp 260,000 Rp 1,820
BAHAN
Mandor OH 0.050 Rp 150,000 Rp 7,500
Kepala tukang kay OH 0.010 Rp 120,000 Rp 1,200
Tukang kayu OH 0.100 Rp 100,000 Rp 10,000
Pekerja OH 0.100 Rp 100,000 Rp 10,000
JUMLAH Rp 72,900.00
3. Pekerjaan Bedeng
1m² Pekerjaan Bedeng
Uraian SatuanKoefisien Harga Satuan Jumlah harga
BAHAN
Dolken Kayu Btg 0.186 Rp 2,000,000 Rp 372,000
Paku Biasa kg 0.300 Rp 19,000 Rp 5,700
Semen Portland kg 18.000 Rp 1,100 Rp 19,800
Pasir Beton m³ 0.030 Rp 214,290 Rp 6,429
Koral Beton m³ 0.05 Rp 325,000 Rp 16,250
Seng Gelombang Lbr 1.50 Rp 47,000 Rp 70,500
Plywood 4mm Lbr 1.350 Rp 49,000 Rp 66,150
TENAGA
Pekerja OH 1.000 Rp 100,000 Rp 100,000
Tukang Kayu OH 2.000 Rp 100,000 Rp 200,000
Kepala Tukang OH 0.200 Rp 120,000 Rp 24,000
Mandor OH 0.050 Rp 150,000 Rp 7,500
JUMLAH Rp 888,328.70
152
4. Pekerjaan Gudang
1m² Pekerjaan Gudang Semen dan Peralatan
Uraian SatuanKoefisien Harga Satuan Jumlah harga
BAHAN
Kayu 5/7 m³ 0.210 Rp 2,700,000 Rp 567,000
Paku Biasa kg 0.300 Rp 19,000 Rp 5,700.00
Semen Portland kg 10.500 Rp 1,100 Rp 11,550.00
Pasir Beton m³ 0.03 Rp 214,290 Rp 6,428.70
Koral Beton m³ 0.05 Rp 325,000 Rp 16,250.00
Seng Gelombang Lbr 1.500 Rp 47,000 Rp 70,500.00
Seng Pelat Lbr 0.250 Rp 21,000 Rp 5,250.00
TENAGA
Pekerja OH 1.000 Rp 100,000 Rp 100,000.00
Tukang Kayu OH 2.000 Rp 100,000 Rp 200,000.00
Kepala Tukang OH 0.200 Rp 120,000 Rp 24,000.00
Mandor OH 0.050 Rp 150,000 Rp 7,500.00
JUMLAH Rp 1,014,178.70
TENAGA
Pekerja OH 1.650 Rp 100,000 Rp 165,000.00
Mandor OH 0.083 Rp 150,000 Rp 12,450.00
Tukang Batu OH 0.275 Rp 100,000 Rp 27,500.00
Kepala Tukang Batu OH 0.028 Rp 120,000 Rp 3,360.00
JUMLAH Rp 994,499
TENAGA
Pekerja OH 0.007 Rp 100,000 Rp 700.00
Tukang Besi OH 0.007 Rp 100,000 Rp 700.00
Kepala Tukang Besi OH 0.007 Rp 120,000 Rp 840.00
Mandor OH 0.004 Rp 150,000 Rp 600.00
JUMLAH Rp 16,505.00
IV PEKERJAAN ARSITEKTUR
A PEKERJAAN PASANGAN DINDING `
1. 1 m² Pekerjaan Dinding Bata Ringan tebal 7,5 cm
Uraian Satuan Koefisien Harga Satuan Jumlah Harga
BAHAN
Bata Ringan m³ 0.100 Rp 770,000 Rp 77,000.00
Mortar kg 0.100 Rp 1,100 Rp 110.00
TENAGA
Pekerja OH 0.670 Rp 100,000 Rp 67,000.00
Tukang Batu OH 1.300 Rp 100,000 Rp 130,000.00
Kepala Tukang OH 0.300 Rp 120,000 Rp 36,000.00
Mandor OH 0.0030 Rp 150,000 Rp 450.00
JUMLAH Rp 310,560.00
3. 1 m² Pekerjaan Acian
Uraian Satuan Koefisien Harga Satuan Jumlah Harga
BAHAN
Semen Portland kg 3.250 Rp 1,100 Rp 3,575.00
TENAGA
Pekerja OH 0.200 Rp 100,000 Rp 20,000.00
Tukang batu OH 0.100 Rp 100,000 Rp 10,000.00
Kepala tukang OH 0.010 Rp 120,000 Rp 1,200.00
Mandor OH 0.010 Rp 150,000 Rp 1,500.00
JUMLAH Rp 36,275.00
162
C PEKERJAAN PLAFOND
1. 1 m² Pekerjaan Langit-Langit Gypsum
Uraian Satuan Koefisien Harga Satuan Jumlah Harga
BAHAN
Gypsum Board Lbr 0.364 Rp57,000 Rp 20,748.00
Paku Skrup Kg 0.110 Rp40,000 Rp 4,400.00
TENAGA
Pekerja OH 0.100 Rp100,000 Rp 10,000.00
Tukang Besi OH 0.050 Rp100,000 Rp 5,000.00
Kepala Tukang OH 0.005 Rp120,000 Rp 600.00
Mandor OH 0.005 Rp150,000 Rp 750.00
JUMLAH Rp 41,498.00
D PEKERJAAN LANTAI
1. 1 m² Pekerjaan Lantai Keramik Uk. 60 x 60
Upah / bahan Satuan Koefisien Harga Satuan Jumlah Harga
Keramik Uk. 60 x 60 bh 3.100 Rp 95,000 Rp 294,500
Semen Portland Kg 9.800 Rp 1,100 Rp 10,780
Semen Warna Kg 1.300 Rp 20,000 Rp 26,000
Pasir Pasang m³ 0.045 Rp 200,000 Rp 9,000
Pekerja OH 0.050 Rp 100,000 Rp 5,000
Tukang Batu OH 0.05 Rp 100,000 Rp 5,000
Kepala Tukang Batu OH 0.035 Rp 120,000 Rp 4,200
Mandor OH 0.035 Rp 150,000 Rp 5,250
JUMLAH Rp 359,730.00
E PEKERJAAN ATAP
1. Pekerjaan Rangka Atap Baja Ringan (III.4)
1m2 Rangka Atap Baja Ringan
Upah / bahan Satuan Koefisien Harga Satuan Jumlah Harga
Reng R 33-0.45 m 5.100 Rp 1,560,000 Rp 7,956,000
Skrup bh 25.000 Rp 70,070.00 Rp 1,751,750
Dynabolt bh 1.000 Rp 77,000.00 Rp 77,000
Pekerja OH 0.247 Rp 100,000 Rp 24,700
Tukang Besi OH 0.176 Rp 100,000 Rp 17,600
Kepala Tukang OH 0.117 Rp 120,000 Rp 14,040
Mandor OH 0.117 Rp 150,000 Rp 17,550
JUMLAH Rp 9,858,640.00
NO PEKERJAAN HARGA
1 PEK. PERSIAPAN Err:509
2 PEK. STRUKTUR BAWAH Err:509
3 PEK. STRUKTUR ATAS LT.DASAR Rp 83,796,011
4 PEK. STRUKTUR ATAS LT.1 Rp 164,865,756
5 PEK. STRUKTUR ATAS LT.2 Rp 167,253,187
6 PEK. STRUKTUR ATAS LT.3 Rp 163,373,578
7 PEK. STRUKTUR ATAS LT.ATAP Rp 1,534,689,836
8 PEK. ARSITEKTUR LT.DASAR Err:509
9 PEK. ARSITEKTUR LT.1 Rp 337,289,824
10 PEK. ARSITEKTUR LT. 2 Rp 308,861,737
11 PEK. ARSITEKTUR LT. 3 Rp 306,023,596
12 PEK. ARSITEKTUR LT. ATAP Err:509
13 PEK. INSTALASI LISTRIK Err:509
14 PEK. INSTALASI AIR Rp 139,751,542
15 PEK. LAIN-LAIN Err:509
TOTAL Err:509
BIAYA PPN 10% Err:509
TOTAL + PPN Err:509
TOTAL + PPN / LUAS BANGUNAN Err:509
176
1 Pekerjaan Balok
1.1 Pekerjaan Bekisting m² 124.26 Rp 256,160
1.2 Pekerjaan Tulangan
1.2.1 Tulangan Ø 8 kg 573.53 Rp 17,487
1.2.2 Tulangan D13 kg 1533.47 Rp 16,505
1.3 Pekerjaan Beton m3 8.14 Rp 955,999
2 Pekerjaan Pelat t. 12cm
2.1 Pekerjaan Bekisting m² 138.57 Rp 247,240
2.2 Pekerjaan Tulangan
2.2.1 Tulangan Ø 8 kg 1590.97 Rp 17,487
2.3 Pekerjaan Beton m3 21.88 Rp 955,999
3 Pekerjaan Kolom
3.1 Pekerjaan Tulangan
3.1.1 Tulangan Ø 8 kg 5075.57 Rp 17,487
3.1.2 Tulangan Ø 6 kg 310.63 Rp 16,715
3.1.3 Tulangan D13 kg 1018.47 Rp 16,505
3.2 Pekerjaan Bekisting m² 132.68 Rp 251,210
3.3 Pekerjaan Beton m3 9.45 Rp 955,999
Pekerjaan Tangga (Lantai 2 ke
4
Lantai 3)
4.1 Pekerjaan Bekisting m² 33.90 Rp 219,995
4.2 Pekerjaan Tulangan
4.2.1 Tulangan Ø 8 kg 209.10 Rp 17,487
4.2.2 Tulangan Ø 10 kg 242.55 Rp 16,505
4.3 Pekerjaan Beton m3 4.70 Rp 955,999
SUB TOTAL
Lantai 3
1 Pekerjaan Balok
1.1 Pekerjaan Bekisting m² 125.91 Rp 256,160
1.2 Pekerjaan Tulangan
1.2.1 Tulangan Ø 8 kg 580.52 Rp 17,487
1.2.2 Tulangan D13 kg 1598.81 Rp 16,505
1.3 Pekerjaan Beton m3
8.25 Rp 955,999
2 Pekerjaan Pelat t. 12cm
2.1 Pekerjaan Bekisting m² 139.63 Rp 247,240
2.2 Pekerjaan Tulangan
2.2.1 Tulangan Ø 8 kg 1590.97 Rp 17,487
2.3 Pekerjaan Beton m3 21.88 Rp 955,999
3 Pekerjaan Kolom
3.1 Pekerjaan Tulangan
180
Pekerjaan Waterproofing
5 m2 25.88 Err:509
Kamar Mandi
6 Pekerjaan Pengecatan
5 Pekerjaan Pengecatan
5 Pekerjaan Pengecatan
5.1 Pekerjaan Cat Dinding
m2 307.81 Rp 27,591
Dalam ex. Mowilex Cendana
5.2 Pekerjaan Cat Plafond +
List Plafond ex. Mowilex m2 169.73 Rp 27,471
Cendana
SUB TOTAL
Lantai Atap
1 Pekerjaan Pasangan Dinding
1.1 Pekerjaan Pasangan
m2 149.39 Rp 310,560
Dinding Bata Ringan
1.2 Pekerjaan Plesteran m² 311.09 Rp 79,202
1.3 Pekerjaan Acian Dinding m² 255.11 Rp 36,275
2 Pekerjaan Kusen
2.1 Pintu P2 unit 3 Rp 902,000
3 Pekerjaan Waterproofing m2 66.48 Err:509
Pekerjaan Pemasangan Atap
4 m2 149.88 Rp 293,150
Genteng Metal
Pekerjaan Pemasangan
5 m' 13.2 Rp 36,960
Lisplank
6 Pekerjaan Pemasangan Jelusi m' 12 Err:509
7 Pekerjaan Pengecatan m2 149.39 Rp 35,391
SUB TOTAL
V PEKERJAAN INSTALASI LISTRIK
185
JUMLAH HARGA
Rp 3,908,580
Rp 5,250,000
Rp 4,228,200
Rp 21,319,889
Rp 24,340,289
Rp 100,000
Rp 100,000
Err:509
Rp 14,300,000
Err:509
Err:509
Err:509
Rp 2,278,560
Rp 1,745,836
Rp 2,124,837
Rp 2,656,908
Rp 1,220,792
Rp 6,125,489
Rp 430,840
Rp 2,818,018
Rp 2,348,374
188
Rp 2,892,885
Rp 747,781
Rp 1,310,269
Err:509
Rp 5,550,296
Rp 566,934
Rp 253,114
JUMLAH HARGA
Rp 357,328
Rp 142,115
Rp 168,843
Rp 5,124,240
Rp 1,306,840
Rp 4,416,000
Err:509
Err:509
Rp 10,707,905
Rp 383,692
Rp 1,902,765
Rp 41,860,730
Rp 12,876,758
189
Rp 8,634,188
Rp 421,403
Rp 450,119
Rp 5,173,864
Rp 1,016,156
Rp 12,799
Rp 355,631
Rp 83,796,011
Rp 31,658,558
Rp 997,858
Rp 2,518,610
Rp 7,732,679
Rp 21,018,861
Rp 2,782,082
Rp 20,840,312
Rp 10,139,372
Rp 592,979
Rp 1,918,184
Rp 39,725,445
Rp 10,261,241
JUMLAH HARGA
Rp 8,634,188
Rp 421,403
Rp 450,119
Rp 5,173,864
Rp 164,865,756
190
Rp 31,831,594
Rp 1,002,915
Rp 2,530,986
Rp 7,777,181
Rp 34,260,047
Rp 2,782,082
Rp 20,919,469
Rp 8,875,521
Rp 519,225
Rp 1,680,980
Rp 33,329,638
Rp 9,030,824
Rp 7,456,907
Rp 365,649
Rp 400,322
Rp 4,489,847
Rp 167,253,187
Rp 32,254,258
Rp 1,015,144
Rp 2,638,835
Rp 7,887,121
Rp 34,522,616
Rp 2,782,082
Rp 20,919,469
191
Rp 7,739,743
Rp 519,225
Rp 1,461,722
Rp 30,887,877
Rp 8,032,761
JUMLAH HARGA
Rp 7,456,907
Rp 365,649
Rp 400,322
Rp 4,489,847
Rp 163,373,578
Rp 16,517,197
Rp 554,965
Rp 1,253,189
Rp 3,345,651
Rp 11,360,184
Rp 2,892,918
Rp 6,366,950
Rp 889,273
Rp 590,376
Rp 135,584
Rp 11,350,673
Rp 1,819,915
Rp 1,477,612,963
Rp 1,534,689,836
192
Rp 113,235,083
Rp 46,209,809
Rp 20,587,289
Rp 24,175,560
Rp 2,706,000
Rp 25,728,768
Rp 18,689,511
Rp 6,869,596
Rp 2,863,868
Rp 64,573,693
JUMLAH HARGA
Rp 1,882,447
Rp 44,726,160
Rp 2,961,969
Err:509
Rp 10,060,115
Rp 326,234
193
Rp 4,547,560
Err:509
Err:509
Rp 110,599,050
Rp 44,807,451
Rp 19,945,003
Rp 2,706,000
Rp 19,162,280
Rp 7,043,368
Rp 2,873,086
Rp 66,010,455
Rp 1,966,485
Rp 44,726,160
Rp 2,961,969
Rp 9,825,922
Rp 4,662,595
Rp 337,289,824
JUMLAH HARGA
194
Rp 95,765,151
Rp 38,802,325
Rp 17,269,178
Rp 2,706,000
Rp 19,162,280
Rp 7,043,368
Rp 2,873,086
Rp 66,010,455
Rp 1,966,485
Rp 41,533,964
Rp 2,558,812
Rp 8,508,038
Rp 4,662,595
Rp 308,861,737
Rp 95,592,790
Rp 38,758,368
Rp 17,249,045
Rp 2,706,000
195
Rp 19,162,280
Rp 7,043,368
Rp 2,873,086
Rp 66,010,455
Rp 1,966,485
Rp 38,947,586
JUMLAH HARGA
Rp 2,558,812
Rp 8,492,725
Rp 4,662,595
Rp 306,023,596
Rp 46,393,006
Rp 24,638,679
Rp 9,253,934
Rp 2,706,000
Err:509
Rp 43,937,322
Rp 487,872
Err:509
Rp 5,286,885
Err:509
196
Rp 25,506,000
Rp 14,418,000
Rp 960,000
Rp 1,440,000
Rp 360,000
Err:509
Err:509
Rp 8,946,000
Rp 240,000
Rp 2,052,000
Rp 9,412,200
Rp 19,408,830
Rp 11,156,310
Err:509
Err:509
JUMLAH HARGA
Err:509
Err:509
Rp 853,632
Rp 8,361,630
Rp 17,502,062
Err:509
Rp 10,660,572
197
Rp 4,134,389
Rp 14,768,883
Rp 32,082,860
Rp 455,400
Rp 25,166,400
Rp 3,741,000
Err:509
Err:509
Rp 19,824,000
Err:509
Err:509
Err:509
Rp 139,751,542
Err:509
Rp 5,250,000
Err:509
206
I PEKERJAAN PERSIAPAN
1 Pekerjaan Pagar Pengaman Proyek Err:509
2 Pekerjaan Pembersihan Lokasi Err:509
3 Pekerjaan Bowplank Err:509
4 Pekerjaan Bedeng Err:509
5 Pekerjaan Gudang Err:509
6 Air Kerja Sementara (Sewa) Err:509
7 Listrik Kerja Sementara (Sewa) Err:509
8 Pekerjaan Air Kerja Err:509
9 Pekerjaan Listrik Kerja Err:509
II PEKERJAAN STRUKTUR BAWAH
1 Pekerjaan Bored Pile Ø 30 cm
1.1 Bored Pile Ø 30 cm L = 18 m Err:509
1.2 Buangan Tanah Lumpur Err:509
2 Pekerjaan Pile Cap
2.1 Pekerjaan Galian Pile Cap Err:509
2.2 Pekerjaan Urugan Pasir bawah Pile Cap t= 10cm Err:509
2.3 Pekerjaan Lantai Kerja Bawah Pile Cap t= 5cm Err:509
2.4 Pekerjaan Bekisting Pile Cap Err:509
2.5 Pekerjaan Tulangan Pile Cap Err:509
2.6 Pekerjaan Beton Pile Cap Err:509
2.7 Pekerjaan Urugan Kembali Galian Pile Cap Err:509
3 Pekerjaan Tie Beam
3.1 Pekerjaan Galian Tie Beam Err:509
3.2 Pekerjaan Urugan Pasir Bawah Tie Beam t= 10 cm Err:509
3.3 Pekerjaan Lantai Kerja Bawah Tie Beam t= 5cm Err:509
3.4 Pekerjaan Tulangan Tie Beam Err:509
3.5 Pekerjaan Bekisting Tie Beam Err:509
3.6 Pekerjaan Beton Tie Beam Err:509
3.7 Pekerjaan Urugan Kembali Galian Tie Beam Err:509
3.8 Pekerjaan Lantai Kerja t= 5cm untuk Lantai Dasar Err:509
4 Pekerjaan Septictank
4.1 Pekerjaan Galian Septictank Err:509
4.2 Pekerjaan Urugan Pasir Septictank Err:509
4.3 Pekerjaan Lantai Kerja Septictank Err:509
206
5 Pekerjaan Pengecatan
5.1 Pekerjaan Cat Dinding Dalam ex. Mowilex Cendana Err:509
5.2 Pekerjaan Cat Plafond + List Plafond ex. Mowilex Err:509
Lantai 2
1 Pekerjaan Pasangan Dinding
1.1 Pekerjaan Pasangan Dinding Bata Ringan Err:509
1.2 Pekerjaan Plesteran Err:509
1.3 Pekerjaan Acian Dinding Err:509
2 Pekerjaan Pintu, Jendela dan Aksesoris
2.1 Pintu Kamar Mandi (P1) PVC Err:509
3 Pekerjaan Plafond
3.1 Rangka Hollow Plafond Err:509
3.2 Pekerjaan Plafond 9 mm Err:509
3.3 Pekerjaan List Plafond Err:509
4 Pekerjaan Lantai dan Dinding Keramik
4.1 Pekerjaan Lantai R.Utama 60x60 ex. Homogenius Tile Err:509
4.2 Pekerjaan Lantai KM/WC 20x20 ex. Arwana Err:509
4.3 Pekerjaan Dinding KM/WC 20x25 ex. Arwana Err:509
4.4 Pekerjaan Lantai Tangga 60x60 ex. Homogenius Tile Err:509
5 Pekerjaan Pengecatan
5.1 Pekerjaan Cat Dinding Dalam ex. Mowilex Cendana Err:509
5.2 Pekerjaan Cat Plafond + List Plafond ex. Mowilex
Err:509
Cendana
Lantai 3
1 Pekerjaan Pasangan Dinding
1.1 Pekerjaan Pasangan Dinding Bata Ringan Err:509
1.2 Pekerjaan Plesteran Err:509
1.3 Pekerjaan Acian Dinding Err:509
2 Pekerjaan Pintu, Jendela dan Aksesoris
2.1 Pintu Kamar Mandi (P1) PVC Err:509
3 Pekerjaan Plafond
3.1 Rangka Hollow Plafond Err:509
3.2 Pekerjaan Plafond 9 mm Err:509
3.3 Pekerjaan List Plafond Err:509
4 Pekerjaan Lantai dan Dinding Keramik
4.1 Pekerjaan Lantai Ruangan 60x60 ex. Homogenius Tile Err:509
4.2 Pekerjaan Lantai KM/WC 20x20 ex. Arwana Err:509
4.3 Pekerjaan Dinding KM/WC 20x25 ex. Arwana Err:509
4.4 Pekerjaan Lantai Tangga 60x60 ex. Homogenius Tile Err:509
5 Pekerjaan Pengecatan
5.1 Pekerjaan Cat Dinding Dalam ex. Mowilex Cendana Err:509
5.2 Pekerjaan Cat Plafond + List Plafond ex. Mowilex
Err:509
Cendana
Lantai Atap
206
Kebutuhan Biaya
Kebutuhan Biaya
Kumulatif
206
MEI JUNI
1 2 3 4 1 2 3
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
206
Err:509
Err:509
206
206
206
206
206
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
206
PROYEK
JALAN TANJUNG DUREN RAYA BLOK N P
Err:509 Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
206
Err:509
Err:509
Err:509 Err:509
Err:509
Err:509
Err:509 Err:509
Err:509
Err:509
206
206
206
206
206
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
206
KURVA S
PROYEK RUKO TANJUNG DUREN
AN TANJUNG DUREN RAYA BLOK N PERSIL NO.361 GROGOL, PETAMBURAN, JAKARTA BA
Err:509 Err:509
206
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 Err:509
Err:509
Err:509
Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
Err:509
206
Err:509
Err:509
Err:509 Err:509
Err:509
206
Err:509
Err:509 Err:509 Err:509
Err:509 Err:509
Err:509
Err:509
Err:509
Err:509
206
206
206
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
206
G DUREN
ROGOL, PETAMBURAN, JAKARTA BARAT
OKTOBER NOVEMBER
2 3 4 1 2 3 4
Err:509
206
206
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 Err:509
Err:509
Err:509
Err:509
Err:509 Err:509
Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
206
Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
206
Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509
Err:509
206
206
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
206
DESEMBER JANUARI
1 2 3 4 1 2 3
Err:509 Err:509
206
206
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
206
Err:509 Err:509
Err:509 Err:509
Err:509
Err:509
Err:509
206
Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
Err:509
206
Err:509
Err:509 Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 Err:509 Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
206
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
206
Err:509 Err:509
206
206
206
Err:509
Err:509
Err:509
Err:509 Err:509
Err:509
Err:509 Err:509
Err:509
Err:509
Err:509 Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 Err:509
Err:509
Err:509 Err:509
Err:509
206
Err:509
Err:509
Err:509
Err:509 Err:509
Err:509
Err:509 Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 Err:509
Err:509
Err:509 Err:509
Err:509
Err:509 Err:509
Err:509
206
Err:509
Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 Err:509
Err:509
Err:509
Err:509
206
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
206
MARET
3
206
206
206
206
206
206
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
201
BAB IV
SIMPULAN
4.1. Kurva S
NO. JENIS PEKERJAAN
I PEKERJAAN PERSIAPAN
1 Pekerjaan Pagar Pengaman Proyek
2 Pekerjaan Pembersihan Lokasi
3 Pekerjaan Bowplank
4 Pekerjaan Bedeng
5 Pekerjaan Gudang
6 Air Kerja Sementara (Sewa)
7 Listrik Kerja Sementara (Sewa)
8 Pekerjaan Air Kerja
9 Pekerjaan Listrik Kerja
II PEKERJAAN STRUKTUR BAWAH
1 Pekerjaan Bored Pile Ø 30 cm
1.1 Bored Pile Ø 30 cm L = 18 m
1.2 Buangan Tanah Lumpur
2 Pekerjaan Pile Cap
2.1 Pekerjaan Galian Pile Cap
2.2 Pekerjaan Urugan Pasir bawah Pile Cap t= 10cm
2.3 Pekerjaan Lantai Kerja Bawah Pile Cap t= 5cm
2.4 Pekerjaan Bekisting Pile Cap
2.5 Pekerjaan Tulangan Pile Cap
2.6 Pekerjaan Beton Pile Cap
2.7 Pekerjaan Urugan Kembali Galian Pile Cap
3 Pekerjaan Tie Beam
3.1 Pekerjaan Galian Tie Beam
3.2 Pekerjaan Urugan Pasir Bawah Tie Beam t= 10 cm
3.3 Pekerjaan Lantai Kerja Bawah Tie Beam t= 5cm
3.4 Pekerjaan Tulangan Tie Beam
3.5 Pekerjaan Bekisting Tie Beam
3.6 Pekerjaan Beton Tie Beam
3.7 Pekerjaan Urugan Kembali Galian Tie Beam
3.8 Pekerjaan Lantai Kerja t= 5cm untuk Lantai Dasar
4 Pekerjaan Septictank
4.1 Pekerjaan Galian Septictank
4.2 Pekerjaan Urugan Pasir Septictank
4.3 Pekerjaan Lantai Kerja Septictank
202
Lantai Atap
1 Pekerjaan Balok
1.1 Pekerjaan Bekisting
1.2 Pekerjaan Tulangan
1.3 Pekerjaan Beton
2 Pekerjaan Pelat t. 10cm
2.1 Pekerjaan Bekisting
2.2 Pekerjaan Tulangan
204
AB IV
PULAN
MARET
HARGA SUB TOTAL BOBOT (%)
###
Rp 3,908,580 Err:509
Rp 5,250,000 Err:509
Rp 4,228,200 Err:509
Rp 21,319,889 Err:509
Rp 24,340,289 Err:509
Rp 100,000 Err:509
Rp 100,000 Err:509
Err:509 Err:509
Rp 14,300,000 Err:509 ###
Err:509 Err:509
Err:509 Err:509
Rp 2,278,560 Err:509
Rp 1,745,836 Err:509
Rp 2,124,837 Err:509
Rp 2,656,908 Err:509
Rp 1,220,792 Err:509
Rp 6,125,489 Err:509
Rp 430,840 Err:509
Rp 2,818,018 Err:509
Rp 2,348,374 Err:509
Rp 2,892,885 Err:509
Rp 2,058,051 Err:509
Err:509 Err:509
Rp 5,550,296 Err:509
Rp 566,934 Err:509
Rp 253,114 Err:509
Rp 357,328 Err:509
Rp 142,115 Err:509
Rp 168,843 Err:509
209
Rp 5,124,240 Err:509
Rp 1,306,840 Err:509
Rp 4,416,000 Err:509
Err:509 Err:509
Rp 12,994,363 Err:509
Rp 41,860,730 Err:509
Rp 12,876,758 Err:509
Rp 8,634,188 Err:509
Rp 871,522 Err:509
Rp 5,173,864 Err:509
Rp 1,016,156 Err:509
HARGA SUB TOTAL BOBOT (%)
Rp 12,799 Err:509
Rp 355,631 Err:509
Rp 31,658,558 Err:509
Rp 3,516,469 Err:509
Rp 7,732,679 Err:509
Rp 21,018,861 Err:509
Rp 2,782,082 Err:509
Rp 20,840,312 Err:509
Rp 12,650,535 Err:509
Rp 39,725,445 Err:509
Rp 10,261,241 Err:509
Rp 8,634,188 Err:509
Rp 871,522 Err:509
Rp 5,173,864 Err:509
Rp 31,831,594 Err:509
Rp 3,533,901 Err:509
210
Rp 7,777,181 Err:509
Rp 34,260,047 Err:509
Rp 2,782,082 Err:509
Rp 20,919,469 Err:509
Rp 11,075,726 Err:509
Rp 33,329,638 Err:509
Rp 9,030,824 Err:509
Rp 7,456,907 Err:509
Rp 765,972 Err:509
Rp 4,489,847 Err:509
Rp 32,254,258 Err:509
Rp 3,653,979 Err:509
Rp 7,887,121 Err:509
Rp 34,522,616 Err:509
Rp 2,782,082 Err:509
Rp 20,919,469 Err:509
Rp 9,720,690 Err:509
Rp 30,887,877 Err:509
Rp 8,032,761 Err:509
Rp 7,456,907 Err:509
Rp 765,972 Err:509
Rp 4,489,847 Err:509
Rp 16,517,197 Err:509
Rp 1,808,154 Err:509
Rp 3,345,651 Err:509
Rp 11,360,184 Err:509
Rp 2,892,918 Err:509
211
Rp 6,366,950 Err:509
Rp 1,615,232 Err:509
Rp 11,350,673 Err:509
Rp 1,819,915 Err:509
Rp 1,477,612,963 Err:509
Rp 113,235,083 Err:509
Rp 46,209,809 Err:509
Rp 20,587,289 Err:509
Rp 24,175,560 Err:509
Rp 2,706,000 Err:509
Rp 25,728,768 Err:509
Rp 18,689,511 Err:509
Rp 6,869,596 Err:509
Rp 2,863,868 Err:509
Rp 64,573,693 Err:509
Rp 1,882,447 Err:509
Rp 44,726,160 Err:509
Rp 2,961,969 Err:509
Err:509 Err:509
Rp 10,060,115 Err:509
Rp 326,234 Err:509
Rp 4,547,560 Err:509
Err:509 Err:509
Rp 110,599,050 Err:509
Rp 44,807,451 Err:509
Rp 19,945,003 Err:509
Rp 2,706,000 Err:509
Rp 19,162,280 Err:509
Rp 7,043,368 Err:509
Rp 2,873,086 Err:509
212
Rp 66,010,455 Err:509
Rp 1,966,485 Err:509
Rp 44,726,160 Err:509
Rp 2,961,969 Err:509
HARGA SUB TOTAL BOBOT (%)
Rp 9,825,922 Err:509
Rp 4,662,595 Err:509
Rp 95,765,151 Err:509
Rp 38,802,325 Err:509
Rp 17,269,178 Err:509
Rp 2,706,000 Err:509
Rp 19,162,280 Err:509
Rp 7,043,368 Err:509
Rp 2,873,086 Err:509
Rp 66,010,455 Err:509
Rp 1,966,485 Err:509
Rp 41,533,964 Err:509
Rp 2,558,812 Err:509
Rp 8,508,038 Err:509
Rp 4,662,595 Err:509
Rp 95,592,790 Err:509
Rp 38,758,368 Err:509
Rp 17,249,045 Err:509
Rp 2,706,000 Err:509
Rp 19,162,280 Err:509
Rp 7,043,368 Err:509
Rp 2,873,086 Err:509
Rp 66,010,455 Err:509
213
Rp 1,966,485 Err:509
Rp 38,947,586 Err:509
Rp 2,558,812 Err:509
Rp 8,492,725 Err:509
Rp 4,662,595 Err:509
Rp 46,393,006 Err:509
Rp 24,638,679 Err:509
Rp 9,253,934 Err:509
Rp 2,706,000 Err:509
Err:509 Err:509
Rp 43,937,322 Err:509
Rp 487,872 Err:509
Err:509 Err:509
Rp 5,286,885 Err:509
Rp 25,506,000 Err:509
Rp 14,418,000 Err:509
HARGA SUB TOTAL BOBOT (%)
###
Rp 960,000 Err:509 ###
Rp 1,440,000 Err:509 ###
Rp 360,000 Err:509 ###
Err:509 Err:509 ###
Err:509 Err:509 ###
Rp 8,946,000 Err:509 ###
Rp 240,000 Err:509 ###
Rp 2,052,000 Err:509 ###
Rp 9,412,200 Err:509
Rp 19,408,830 Err:509
Rp 11,156,310 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Rp 853,632 Err:509
Rp 8,361,630 Err:509
Rp 17,502,062 Err:509
Err:509 Err:509
214
Rp 10,660,572 Err:509
Rp 4,134,389 Err:509
Rp 14,768,883 Err:509
Rp 32,082,860 Err:509
Rp 455,400 Err:509
Rp 25,166,400 Err:509 ###
Rp 3,741,000 Err:509 ###
Err:509 Err:509 ###
Err:509 Err:509 ###
Rp 19,824,000 Err:509 ###
Err:509 Err:509 ###
Err:509 Err:509
Err:509 Err:509
Lantai Atap
1 Pekerjaan Balok
1.1 Pekerjaan Bekisting m² 64.48 Rp 256,160
1.2 Pekerjaan Tulangan
1.2.1 Tulangan Ø 8 kg 317.36 Rp 17,487
1.2.2 Tulangan D13 kg 759.28 Rp 16,505
1.3 Pekerjaan Beton m3
3.50 Rp 955,999
2 Pekerjaan Pelat t. 10cm
2.1 Pekerjaan Bekisting m² 45.95 Rp 247,240
2.2 Pekerjaan Tulangan
2.2.1 Tulangan Ø 8 kg 1654.3488 Rp 17,487
2.3 Pekerjaan Beton m3
6.66 Rp 955,999
3 Pekerjaan Kolom
3.1 Pekerjaan Tulangan
3.1.1 Tulangan Ø 8 kg 508.54 Rp 17,487
3.1.2 Tulangan Ø 6 kg 353.20 Rp 16,715
3.1.3 Tulangan D13 kg 82.15 Rp 16,505
3.2 Pekerjaan Bekisting m² 45.18 Rp 251,210
3.3 Pekerjaan Beton m3 1.90 Rp 955,999
NO. URAIAN PEKERJAAN SATUANVOLUME HARGA SATUAN
Pekerjaan Rangka Atap Baja
4 m² 149.88 Rp 9,858,640
Ringan
SUB TOTAL
IV PEKERJAAN ARSITEKTUR
Lantai Dasar
1 Pekerjaan Pasangan Dinding
1.1 Pekerjaan Pasangan
m2 364.62 Rp 310,560
Dinding Bata Ringan
1.2 Pekerjaan Plesteran m² 583.44 Rp 79,202
1.3 Pekerjaan Acian Dinding m² 567.53 Rp 36,275
Pekerjaan Pintu, Jendela dan
2
Aksesoris
2.1 Pekerjaan (PJ1)
unit 3 Rp 8,058,520
Alumunium
2.2 Pintu Kamar Mandi (P1)
unit 3 Rp 902,000
PVC
2.3 Pekerjaan Jendela (J1)
unit 3 Rp 8,576,256
Alumunium
3 Pekerjaan Plafond
3.1 Rangka Hollow Plafond m2 165.54 Rp 112,900
3.2 Pekerjaan Plafond 9 mm m2 165.54 Rp 41,498
181
5 Pekerjaan Pengecatan
5.1 Pekerjaan Cat Dinding
m2 308.36 Rp 27,591
Dalam ex. Mowilex Cendana
5.2 Pekerjaan Cat Plafond +
List Plafond ex. Mowilex m2 169.73 Rp 27,471
Cendana
Lantai 3
1 Pekerjaan Pasangan Dinding
1.1 Pekerjaan Pasangan
m2 307.81 Rp 310,560
Dinding Bata Ringan
NO. URAIAN PEKERJAAN SATUANVOLUME HARGA SATUAN
1.2 Pekerjaan Plesteran m² 489.36 Rp 79,202
1.3 Pekerjaan Acian Dinding m² 475.51 Rp 36,275
Pekerjaan Pintu, Jendela dan
2
Aksesoris
2.1 Pintu Kamar Mandi (P1)
unit 3 Rp 902,000
PVC
3 Pekerjaan Plafond
3.1 Rangka Hollow Plafond m2 169.73 Rp 112,900
3.2 Pekerjaan Plafond 9 mm m2 169.73 Rp 41,498
3.3 Pekerjaan List Plafond m' 129.36 Rp 22,210
Pekerjaan Lantai dan Dinding
4
Keramik
JUMLAH HARGA
Rp 3,908,580
Rp 5,250,000
Rp 4,228,200
Rp 21,319,889
Rp 24,340,289
Err:509
Rp 14,300,000
Err:509
Err:509
Rp 2,278,560
Rp 1,745,836
Rp 2,124,837
Rp 2,656,908
Rp 1,220,792
Rp 6,125,489
Rp 430,840
Rp 2,818,018
Rp 2,348,374
Rp 2,892,885
187
Rp 747,781
Rp 1,310,269
Err:509
Rp 5,550,296
Rp 566,934
Rp 253,114
Rp 357,328
Rp 142,115
Rp 168,843
Rp 5,124,240
Rp 1,306,840
Rp 4,416,000
Err:509
Rp 10,707,905
Rp 383,692
JUMLAH HARGA
Rp 1,902,765
Rp 41,860,730
Rp 12,876,758
Rp 8,634,188
Rp 421,403
Rp 450,119
Rp 5,173,864
Rp 1,016,156
Rp 12,799
188
Rp 355,631
Rp 31,658,558
Rp 997,858
Rp 2,518,610
Rp 7,732,679
Rp 21,018,861
Rp 2,782,082
Rp 20,840,312
Rp 10,139,372
Rp 592,979
Rp 1,918,184
Rp 39,725,445
Rp 10,261,241
Rp 8,634,188
Rp 421,403
Rp 450,119
Rp 5,173,864
Rp 31,831,594
Rp 1,002,915
Rp 2,530,986
Rp 7,777,181
Rp 34,260,047
Rp 2,782,082
Rp 20,919,469
189
Rp 8,875,521
JUMLAH HARGA
Rp 519,225
Rp 1,680,980
Rp 33,329,638
Rp 9,030,824
Rp 7,456,907
Rp 365,649
Rp 400,322
Rp 4,489,847
Rp 32,254,258
Rp 1,015,144
Rp 2,638,835
Rp 7,887,121
Rp 34,522,616
Rp 2,782,082
Rp 20,919,469
Rp 7,739,743
Rp 519,225
Rp 1,461,722
Rp 30,887,877
Rp 8,032,761
Rp 7,456,907
Rp 365,649
Rp 400,322
Rp 4,489,847
190
Rp 16,517,197
Rp 554,965
Rp 1,253,189
Rp 3,345,651
Rp 11,360,184
Rp 2,892,918
Rp 6,366,950
Rp 889,273
Rp 590,376
Rp 135,584
Rp 11,350,673
Rp 1,819,915
JUMLAH HARGA
Rp 1,477,612,963
Rp 2,113,978,368
Rp 113,235,083
Rp 46,209,809
Rp 20,587,289
Rp 24,175,560
Rp 2,706,000
Rp 25,728,768
Rp 18,689,511
Rp 6,869,596
191
Rp 2,863,868
Rp 64,573,693
Rp 1,882,447
Rp 44,726,160
Rp 2,961,969
Err:509
Rp 10,060,115
Rp 326,234
Rp 4,547,560
Err:509
Rp 110,599,050
Rp 44,807,451
Rp 19,945,003
Rp 2,706,000
JUMLAH HARGA
Rp 19,162,280
Rp 7,043,368
Rp 2,873,086
192
Rp 66,010,455
Rp 1,966,485
Rp 44,726,160
Rp 2,961,969
Rp 9,825,922
Rp 4,662,595
Rp 95,765,151
Rp 38,802,325
Rp 17,269,178
Rp 2,706,000
Rp 19,162,280
Rp 7,043,368
Rp 2,873,086
Rp 66,010,455
Rp 1,966,485
Rp 41,533,964
Rp 2,558,812
193
Rp 8,508,038
Rp 4,662,595
Rp 95,592,790
JUMLAH HARGA
Rp 38,758,368
Rp 17,249,045
Rp 2,706,000
Rp 19,162,280
Rp 7,043,368
Rp 2,873,086
Rp 66,010,455
Rp 1,966,485
Rp 38,947,586
Rp 2,558,812
Rp 8,492,725
Rp 4,662,595
Rp 46,393,006
194
Rp 24,638,679
Rp 9,253,934
Rp 2,706,000
Err:509
Rp 43,937,322
Rp 487,872
Err:509
Rp 5,286,885
Err:509
Rp 25,506,000
Rp 14,418,000
Rp 960,000
Rp 1,440,000
Rp 360,000
JUMLAH HARGA
Err:509
Err:509
Rp 8,946,000
Rp 240,000
Rp 2,052,000
Rp 9,412,200
Rp 19,408,830
195
Rp 11,156,310
Err:509
Err:509
Err:509
Err:509
Rp 853,632
Rp 8,361,630
Rp 17,502,062
Err:509
Rp 10,660,572
Rp 4,134,389
Rp 14,768,883
Rp 32,082,860
Rp 455,400
Rp 25,166,400
Rp 3,741,000
Err:509
Err:509
Rp 19,824,000
Err:509
Err:509
Err:509
Err:509
Err:509
Rp 5,250,000
Err:509
MENCARI JULAH PEKERJA per HARI AS (Volume x Koefisien) / Asumsi Hari = P
I PEKERJAAN PERSIAPAN
1. Pekerjaan Pagar Pengaman Proyek 2.
Upah / bahan Satuan Koef. Vol x Koef Durasi Unit Upah / bahan
Dolken Kayu Btg 1.250 15 15.00 Mandor
Semen Portland kg 2.500 30 30.00 Pekerja
Seng Gelombang lbr 1.200 14.4 14.40
Pasir Beton m³ 0.005 0.06 0.06
Koral Beton m³ 0.009 0.108 0.11
Kayu 5/7 m³ 0.072 0.864 0.86
1
Paku Biasa kg 0.060 0.72 0.72
Meni Besi Liter 0.450 5.4 5.40
Pekerja OH 0.200 2.4 2.40
Tukang Kayu OH 0.400 4.8 4.80
Kepala Tukang OH 0.020 0.24 0.24
Mandor OH 0.020 0.24 0.24
PEKERJAAN STRUKTUR
II
BAWAH
1 Pekerjaan Bored Pile Ø 30 cm 2
1.1 Bored Pile Ø 30 cm L = 18 m
Upah / bahan
Pekerja
Mandor
Lantai 1
1 Pekerjaan Balok
1.1 Pekerjaan Bekisting 1.2 Pekerjaan Tulangan
Upah / bahan Satuan Koef. Vol x Koef Durasi Unit Upah / bahan
Kayu Kelas III m³ 0.040 4.94 0.99 Besi d8
Paku 5 cm kg 0.400 49.44 9.89 Kawat Be
Minyak Bekisting liter 0.200 24.72 4.94 Pekerja
Balok Kayu Kelas m³ 0.018 2.22 0.44 Tukang Be
Plywood t.9mm lbr 0.350 43.26 8.65 Kepala Tu
5
Dolken Kayu Btg 2.000 247.18 49.44 Mandor
Pekerja OH 0.660 81.57 16.31 besi d13
Tukang Kayu OH 0.330 40.78 8.16
Kepala Tukang OH 0.033 4.08 0.82
Mandor OH 0.033 4.08 0.82
Lantai 2
1 Pekerjaan Balok
1.1 Pekerjaan Bekisting 1.2 Pekerjaan Tulangan
Upah / bahan Satuan Koef. Vol x Koef Durasi Unit Upah / bahan
Kayu Kelas III m³ 0.040 4.97 0.99 Besi
Paku 5 cm kg 0.400 49.71 9.94 Kawat Be
Minyak Bekisting liter 0.200 24.85 4.97 Pekerja
Balok Kayu Kelas m³ 0.018 2.24 0.45 Tukang Be
Plywood t.9mm lbr 0.350 43.49 8.70 Kepala Tu
5
Dolken Kayu Btg 2.000 248.53 49.71 Mandor
Pekerja OH 0.660 82.01 16.40 besi d13
Tukang Kayu OH 0.330 41.01 8.20
5
Lantai 3
1 Pekerjaan Balok
1.1 Pekerjaan Bekisting 1.2 Pekerjaan Tulangan
Upah / bahan Satuan Koef. Vol x Koef Durasi Unit Upah / bahan
Kayu Kelas III m³ 0.040 5.04 1.01 Besi
Paku 5 cm kg 0.400 50.37 10.07 Kawat Be
Minyak Bekisting liter 0.200 25.18 5.04 Pekerja
Balok Kayu Kelas m³ 0.018 2.27 0.45 Tukang Be
Plywood t.9mm lbr 0.350 44.07 8.81 Kepala Tu
5
Dolken Kayu Btg 2.000 251.83 50.37 Mandor
Pekerja OH 0.660 83.10 16.62 besi d13
Tukang Kayu OH 0.330 41.55 8.31
Kepala Tukang OH 0.033 4.16 0.83
Mandor OH 0.033 4.16 0.83
Lantai Atap
1 Pekerjaan Balok
1.1 Pekerjaan Bekisting 1.2 Pekerjaan Tulangan
Upah / bahan Satuan Koef. Vol x Koef Durasi Unit Upah / bahan
Kayu Kelas III m³ 0.040 2.58 0.52 Besi
Paku 5 cm kg 0.400 25.79 5.16 Kawat Be
Minyak Bekisting liter 0.200 12.90 2.58 Pekerja
Balok Kayu Kelas m³ 0.018 1.16 0.23 Tukang Be
Plywood t.9mm lbr 0.350 22.57 4.51 Kepala Tu
5
Dolken Kayu Btg 2.000 128.96 25.79 Mandor
Pekerja OH 0.660 42.56 8.51 besi d13
Tukang Kayu OH 0.330 21.28 4.26
Kepala Tukang OH 0.033 2.13 0.43
Mandor OH 0.033 2.13 0.43
IV PEKERJAAN ARSITEKTUR
Lantai Dasar
Upah / bahan Satuan Koef. Vol x Koef Durasi Unit Upah / bahan
5
Besi Angkur Kg 0.280 102.09 20.42 Pekerja
Lantai 1
Upah / bahan Satuan Koef. Vol x Koef Durasi Unit Upah / bahan
Bata Ringan m³ 0.100 35.61 7.12 Semen por
5
Besi Angkur Kg 0.280 99.72 19.94 Pekerja
Pekerja OH 0.200 71.23 14.25 Tukang Ba
Tukang Batu OH 0.100 35.61 7.12 Kepala Tu
Kepala Tukang OH 0.010 3.56 0.71 Mandor
Mandor OH 0.0100 3.56 0.71
Lantai 2
1 Pekerjaan Pasangan Dinding
Upah / bahan Satuan Koef. Vol x Koef Durasi Unit Upah / bahan
Bata Ringan m³ 0.100 30.84 6.17 Semen por
5
Besi Angkur Kg 0.280 86.34 17.27 Pekerja
Pekerja OH 0.200 61.67 12.33 Tukang Ba
Tukang Batu OH 0.100 30.84 6.17 Kepala Tu
Kepala Tukang OH 0.010 3.08 0.62 Mandor
Mandor OH 0.0100 3.08 0.62
Lantai 3
Upah / bahan Satuan Koef. Vol x Koef Durasi Unit Upah / bahan
Bata Ringan m³ 0.100 30.78 6.16 Semen por
5
Besi Angkur Kg 0.280 86.19 17.24 Pekerja
Pekerja OH 0.200 61.56 12.31 Tukang Ba
Tukang Batu OH 0.100 30.78 6.16 Kepala Tu
Kepala Tukang OH 0.010 3.08 0.62 Mandor
Mandor OH 0.0100 3.08 0.62
Lantai Atap
1 Pekerjaan Pasangan Dinding
1.1 Pekerjaan Pasangan Dinding Bata
1.2 Pekerjaan Plesteran
Ringan
Upah / bahan Satuan Koef. Vol x Koef Durasi Unit Upah / bahan
Bata Ringan m³ 0.100 14.94 3.73
Semen por
Perekat Bata Sak 0.100 14.94 3.73 Pasir pas
Besi Angkur Kg 0.280 41.83 10.46 Pekerja
4
Pekerja OH 0.200 29.88 7.47 Tukang Ba
Tukang Batu OH 0.100 14.94 3.73 Kepala Tu
Kepala Tukang OH 0.010 1.49 0.37 Mandor
Mandor OH 0.0100 1.49 0.37
PEKERJAAN INSTALASI
V
LISTRIK
1 Pekerjaan Pemasangan Main Panel 2
Upah / bahan Satuan Koef. Vol x Koef Durasi Unit Upah / bahan
1
Pekerja OH 0.054 1.053 1.053 Pekerja
Satuan Koef. Vol x Koef Durasi Unit Upah / bahanSatuan Koef. Vol x Koef
10
OH 0.400 233.38 23.34 Tukang ba OH 0.100 56.75
1.3
Pekerja
1.2 Pekerjaan Plesteran
an Acian
Dinding
Satuan Koef. Vol x Koef Durasi Unit Upah / bahanSatuan Koef. Vol x Koef
Kg 6.912 3910.35 391.03 Semen Por kg 3.250 1786.94
10
OH 0.400 226.29 22.63 Tukang ba OH 0.100 54.98
OH 0.200 113.15 11.31 Kepala tu OH 0.010 5.50
OH 0.020 11.31 1.13 Mandor OH 0.010 5.50
OH 0.022 12.45 1.24
1.3
Pekerja
1.2 Pekerjaan Plesteran
an Acian
Dinding
Satuan Koef. Vol x Koef Durasi Unit Upah / bahanSatuan Koef. Vol x Koef
Kg 6.912 3386.28 338.63 Semen Por kg 3.250 1547.20
10
OH 0.400 195.97 19.60 Tukang ba OH 0.100 47.61
OH 0.200 97.98 9.80 Kepala tu OH 0.010 4.76
OH 0.020 9.80 0.98 Mandor OH 0.010 4.76
OH 0.022 10.78 1.08
1.3
Pekerja
1.2 Pekerjaan Plesteran
an Acian
Dinding
Satuan Koef. Vol x Koef Durasi Unit Upah / bahanSatuan Koef. Vol x Koef
Kg 6.912 3382.45 338.24 Semen Por kg 3.250 1545.40
10
OH 0.400 195.74 19.57 Tukang ba OH 0.100 47.55
OH 0.200 97.87 9.79 Kepala tu OH 0.010 4.76
OH 0.020 9.79 0.98 Mandor OH 0.010 4.76
OH 0.022 10.77 1.08
1.3
Pekerja
1.2 Pekerjaan Plesteran
an Acian
Dinding
Satuan Koef. Vol x Koef Durasi Unit Upah / bahanSatuan Koef. Vol x Koef
Kg 6.912 2150.22 307.17 Semen Por kg 3.250 829.09
4
OH 0.054 7.533 1.88325 Pekerja OH 0.054 18.711
16.22
7
8.11
0.81
0.81
15.71
7
7.85
0.79
0.79
Pekerjaan Pintu, Jendela dan
2
Aksesoris
13.60
7
6.80
0.68
0.68
13.59
7
6.79
0.68
0.68
60 Stop Kontak bh 1 48
1 1
10 2
1.8711 Pekerja OH 0.081 21.5055
Unit Upah / bahanSatuan Koef. Vol x Koef Durasi Unit Upah / bahan
Pintu Jendela
1.5 Kamar bh 1 Alumini
Mandi 3 2 1.5 um
3 Pekerjaan Plafond
Unit Upah / bahanSatuan Koef. Vol x Koef Durasi Unit Upah / bahan
3 Hollow 40 batang 0.400 67.89 16.97 Gypsum B
Assesori
s ls 0.400 67.89 16.97
(Perkuat
an, Las) 4 Paku Skru
Pekerja OH 0.350 59.40 14.85 Pekerja
Tukang Be OH 0.350 59.40 14.85 Tukang K
Kepala Tu OH 0.035 5.94 1.49 Kepala Tu
Mandor OH 0.018 3.06 0.76 Mandor
3 Pekerjaan Plafond
Unit Upah / bahanSatuan Koef. Vol x Koef Durasi Unit Upah / bahan
3 Hollow 40 batang 0.400 67.89 16.97 Gypsum B
Assesori
s ls 0.400 67.89 16.97
(Perkuat
an, Las) 4 Paku Skru
Pekerja OH 0.350 59.40 14.85 Pekerja
Tukang Be OH 0.350 59.40 14.85 Tukang K
Kepala Tu OH 0.035 5.94 1.49 Kepala Tu
Mandor OH 0.018 3.06 0.76 Mandor
3 Pekerjaan Plafond
Unit Upah / bahanSatuan Koef. Vol x Koef Durasi Unit Upah / bahan
Hollow 40 batang 0.400 67.89 16.97 Gypsum B
Assesori
s ls 0.400 66.22 22.07
(Perkuat
an, Las) 4 Paku Skru
Pekerja OH 0.350 57.94 19.31 Pekerja
Tukang Be OH 0.350 57.94 19.31 Tukang K
Kepala Tu OH 0.035 5.79 1.93 Kepala Tu
Mandor OH 0.018 2.98 0.99 Mandor
3 Pekerjaan Waterproofing 4
Unit Upah / bahanSatuan Koef. Vol x Koef Durasi Unit Upah / bahan
Waterpro 166.20 55.40
kg 2.5 Genteng M
ofing
Kuas bh 0.2 13.30 4.43 Paku Bias
Pekerja OH 0.02 1.33 3 0.44 Pekerja
Mandor OH 0.083 5.52 1.84 Tukang K
Tukang Ca OH 0.275 18.28 6.09 Kepala Tu
Kepala Tu OH 0.028 1.86 0.62 Mandor
1
10.75275 Pekerja OH 0.135 12.64 12.636 Pekerja
3 Pekerjaan Kolom
2.3 Pekerjaan Beton 3.1 Pekerjaan Tulangan
Satuan Koef. Vol x Koef Durasi Unit Upah / bahanSatuan Koef. Vol x Koef
kg 371.00 8087.62 2695.87 Besi d8 kg 10.500 6088.23
m³ 698.00 15216.07 5072.02 Kawat Be kg 0.150 109.73
m³ 1047 22824.10 7608.03 Pekerja OH 0.070 51.21
OH 1.650 35.97 11.99 Tukang Be OH 0.070 51.21
3
OH 0.083 1.81 0.60 Kepala Tu OH 0.007 5.12
OH 0.275 5.99 2.00 Mandor OH 0.004 2.93
OH 0.028 0.61 0.20 besi d6 kg 10.500 372.4963
Ltr 215 4686.90 1562.30 besi d13 kg 10.500 1220.293
3 Pekerjaan Kolom
2.3 Pekerjaan Beton 3.1 Pekerjaan Tulangan
Satuan Koef. Vol x Koef Durasi Unit Upah / bahanSatuan Koef. Vol x Koef
kg 371.00 8118.34 2706.11 Besi d8 kg 10.500 5329.35
m³ 698.00 15273.86 5091.29 Kawat Be kg 0.150 96.07
m³ 1047 22910.79 7636.93 Pekerja OH 0.070 44.83
OH 1.650 36.11 12.04 Tukang Be OH 0.070 44.83
3
OH 0.083 1.82 0.61 Kepala Tu OH 0.007 4.48
OH 0.275 6.02 2.01 Mandor OH 0.004 2.56
OH 0.028 0.61 0.20 besi d6 kg 10.500 326.1659
Ltr 215 4704.70 1568.23 besi d13 kg 10.500 1069.391
3 Pekerjaan Kolom
2.3 Pekerjaan Beton 3.1 Pekerjaan Tulangan
Satuan Koef. Vol x Koef Durasi Unit Upah / bahanSatuan Koef. Vol x Koef
kg 371.00 8118.34 2706.11 Besi d8 kg 10.500 4647.36
m³ 698.00 15273.86 5091.29 Kawat Be kg 0.150 84.33
m³ 1047 22910.79 7636.93 Pekerja OH 0.070 39.36
OH 1.650 36.11 12.04 Tukang Be OH 0.070 39.36
3
OH 0.083 1.82 0.61 Kepala Tu OH 0.007 3.94
OH 0.275 6.02 2.01 Mandor OH 0.004 2.25
OH 0.028 0.61 0.20 besi d6 kg 10.500 326.1659
Ltr 215 4704.70 1568.23 besi d13 kg 10.500 929.905
3 Pekerjaan Kolom
2.3 Pekerjaan Beton 3.1 Pekerjaan Tulangan
Satuan Koef. Vol x Koef Durasi Unit Upah / bahanSatuan Koef. Vol x Koef
kg 371.00 2470.86 2470.86 Besi kg 10.500 533.97
m³ 698.00 4648.68 4648.68 Kawat Be kg 0.150 14.16
m³ 1047 6973.02 6973.02 Pekerja OH 0.070 6.61
OH 1.650 10.99 10.99 Tukang Be OH 0.070 6.61
1
OH 0.083 0.55 0.55 Kepala Tu OH 0.007 0.66
OH 0.275 1.83 1.83 Mandor OH 0.004 0.38
OH 0.028 0.19 0.19 besi d6 kg 10.500 370.8611
Ltr 215 1431.90 1431.90 besi d13 kg 10.500 86.25459
3 Pekerjaan Plafond
2.3 Pekerjaan Jendela (J1)
3.1 Rangka Hollow Plafond
Alumunium
Satuan Koef. Vol x Koef Durasi Unit Upah / bahanSatuan Koef. Vol x Koef
bh 1 66.22
3 1 3 Hollow 40 batang 0.400
Assesori
s ls 0.400 66.22
(Perkuat
an, Las)
Pekerja OH 0.350 57.94
57.94
Tukang Be OH 0.350
Kepala Tu OH 0.035 5.79
Mandor OH 0.018 2.98
Satuan Koef. Vol x Koef Durasi Unit Upah / bahanSatuan Koef. Vol x Koef
Lbr 0.364 61.78 30.89 List Gyps m' 1.050 135.83
Satuan Koef. Vol x Koef Durasi Unit Upah / bahanSatuan Koef. Vol x Koef
Lbr 0.364 61.78 30.89 List Gyps m' 1.050 135.83
Satuan Koef. Vol x Koef Durasi Unit Upah / bahanSatuan Koef. Vol x Koef
Lbr 0.364 61.78 30.89 List Gyps m' 1.050 135.83
1
OH 0.135 4.9005 4.9005 Pekerja OH 0.135 7.49
6448.87
1
10.16
0.51
1.69
0.17
1324.27
Meja Dapur
3.2 Pekerjaan Tulangan
Durasi Unit Upah / bahanSatuan Koef. Vol x Koef Durasi Unit
0.16 Besi d8 kg 10.500 76.85 76.85
1.64 Kawat Be kg 0.150 1.10 1.10
0.82 Pekerja OH 0.070 0.51 0.51
1
0.06 Tukang Be OH 0.070 0.51 0.51
1.44 Kepala Tu OH 0.007 0.05 0.05
1
24.66 Mandor OH 0.004 0.03 0.03
2.71
1.36
0.14
0.14
an Plafond
w Plafond 3.2 Pekerjaan Plafond 9 mm
1
6.47 Semen Wa Kg 1.300 238.55 7 34.08
0.65 Pasir Pas m³ 0.045 8.26 1.18
0.52 Pekerja OH 0.050 9.18 1.31
0.39 Tukang Ba OH 0.05 9.18 1.31
Kepala Tu OH 0.035 6.42 0.92
Mandor OH 0.035 6.42 0.92
4 Pekerjaan Lantai dan Dinding Keramik
1
6.47 Semen Wa Kg 1.300 238.55 7 34.08
0.65 Pasir Pas m³ 0.045 8.26 1.18
0.52 Pekerja OH 0.050 9.18 1.31
0.39 Tukang Ba OH 0.05 9.18 1.31
Kepala Tu OH 0.035 6.42 0.92
Mandor OH 0.035 6.42 0.92
1
6.47 Semen Wa Kg 1.300 238.55 7 34.08
0.65 Pasir Pas m³ 0.045 8.26 1.18
0.52 Pekerja OH 0.050 9.18 1.31
0.39 Tukang Ba OH 0.05 9.18 1.31
Kepala Tu OH 0.035 6.42 0.92
Mandor OH 0.035 6.42 0.92
Pekerjaan Pemasangan
angan Lisplank 6
Jelusi
Durasi Unit Upah / bahanSatuan Koef. Vol x Koef Durasi Unit
0.15 Jelusi m 1 12 12
1
0.66 Pekerja
1 1.32 Mandor
2.64
0.26
0.07
12 Saklar 21 21
bh 1
1 Tunggal 1
1 1
7.4925 Pekerja OH 0.135 9.9225 9.9225
Mandor OH
3.3 Pekerjaan Beton
Upah / bahan Satuan Koef. Vol x Koef Durasi Unit
Semen portland kg 371.00 138.01 138.01
Pasir Beton m³ 698.00 259.66 259.66
Spilt 2-3 m³ 1047 389.48 389.48
Pekerja OH 1.650 0.61 0.61
1
Mandor OH 0.083 0.03 0.03
Tukang Batu OH 0.275 0.10 0.10
Kepala Tukang OH 0.028 0.01 0.01
Air Ltr 215 79.98 79.98
Upah / bahan Satuan Koef. Vol x Koef Durasi Unit Upah / bahanSatuan
4.2 Pekerjaan Lantai KM/WC 20x20 ex. Arwana 4.3 Pekerjaan Dinding KM/WC
Upah / bahan Satuan Koef. Vol x Koef Durasi Unit Upah / bahanSatuan
Keramik Uk. 20 x 20 bh 26.500 119.99 119.99 Keramik U bh
Upah / bahan Satuan Koef. Vol x Koef Durasi Unit Upah / bahanSatuan
Keramik Uk. 20 x 20 bh 26.500 119.99 119.99 Keramik U bh
4.2 Pekerjaan Lantai KM/WC 20x20 ex. Arwana 4.3 Pekerjaan Dinding KM/WC
Upah / bahan Satuan Koef. Vol x Koef Durasi Unit Upah / bahanSatuan
Keramik Uk. 20 x 20 bh 26.500 119.99 119.99 Keramik U bh
7 Pekerjaan Pengecatan
Upah / bahan Satuan Koef. Vol x Koef Durasi Unit
Plamir Tembok kg 0.100 14.94 14.94
Perlengk
Tukang Batu OH 0.100 1.2 1.2 apan %
(6%dari
bahan)
1
Kepala Tukang Batu OH 0.010 0.12 0.12 Tukang Batu OH
Kepala
Pekerja OH 0.010 0.12 0.12 Tukang OH
Batu
Mandor OH 0.005 0.06 0.06 Pekerja OH
Mandor OH
rjaan Urugan Pasir Bawah Tie Beam t= 10 cm 3.3 Pekerjaan Lantai Kerja Bawah Tie Beam t= 5cm
Koef. Vol x Koef Durasi Unit Upah / bahanSatuan Koef. Vol x Koef Durasi
1.200 7.20 kg 230.00 715.24
7.20 Semen por
0.300 1 1.80 kg 893.00 2777.01
1.80 Pasir Bet
0.010 0.06 kg 1027 3193.71
0.06 Batu Kora 1
Air ltr 200 621.95
Pekerja OH 1.20 3.73
Mandor OH 0.060 0.19
Tukang Ba OH 0.200 0.62
Kepala Tu OH 0.020 0.06
Pekerjaan Tangga (Lt. 1 ke Lt. 2)
rjaan Bekisting 2.2 Pekerjaan Tulangan
Koef. Vol x Koef Durasi Unit Upah / bahanSatuan Koef. Vol x Koef Durasi
0.030 1.18 0.59 Besi d8 kg 10.500 253.03
0.400 15.70 7.85 Kawat Be kg 0.150 7.71
0.150 5.89 2.94 Pekerja OH 0.070 3.60
2
0.015 0.59 0.29 Tukang Be OH 0.070 3.60
0.350 13.74 6.87 Kepala Tu OH 0.007 0.36
2
2.000 78.49 39.25 Mandor OH 0.004 0.21
0.660 25.90 12.95 besi d10 kg 10.500 286.3524
0.330 12.95 6.48
0.033 1.30 0.65
0.033 1.30 0.65
Koef. Vol x Koef Durasi Unit Upah / bahanSatuan Koef. Vol x Koef Durasi
Koef. Vol x Koef Durasi Unit Upah / bahanSatuan Koef. Vol x Koef Durasi
20.000 1151.71 383.90 Keramik U bh 3.100 100.44
Koef. Vol x Koef Durasi Unit Upah / bahanSatuan Koef. Vol x Koef Durasi
20.000 1069.51 534.76 Keramik U bh 3.100 86.77
Koef. Vol x Koef Durasi Unit Upah / bahanSatuan Koef. Vol x Koef Durasi
20.000 1002.91 501.46 Keramik U bh 3.100 86.77
36 36 Kabel 162
1 m 1
1 Tufur
2
0.01 0.36 0.36 Tukang Listrik OH 0.021 3.402
Pekerja OH 0.01 1.62
Perlengk
6.000 72 24 apan % 6.000 72
(6%dari
bahan)
3 2
1.100 13.2 4.4 Tukang B OH 1.100 13.2
Kepala
0.010 0.12 0.04 Tukang OH 0.001 0.012
Batu
3.300 39.6 13.2 Pekerja OH 0.200 2.4
0.160 1.92 0.64 Mandor OH 0.160 1.92
1282.56
Tie Beam t= 5cm 3.4 Pekerjaan Tulangan Tie Beam 3.5 Pekerjaan Bekisting Tie
Unit Upah / bahanSatuan Koef. Vol x Koef Durasi Unit Upah / bahan
715.24 Besi d8 kg 10.500 449.01 112.25
Kayu Kela
2777.01 Kawat Be kg 0.150 18.32 4.58
Paku 5 cm
3193.71 Pekerja OH 0.070 8.55 4 2.14
Minyak Be
621.95 Tukang Be OH 0.070 8.55 2.14 Pekerja
3.73 Kepala Tu OH 0.007 0.86 0.21 Tukang K
0.19 Mandor OH 0.004 0.49 0.12 Kepala Tu
0.62 besi d13 kg 10.500 833.5553 208.39 Mandor
0.06
2.3 Pekerjaan Beton
Unit Upah / bahanSatuan Koef. Vol x Koef Durasi Unit
126.52 Semen por kg 371 2007.85 2007.85
3.85 Pasir Bet kg 698 3777.58 3777.58
1.80 Spilt 2-3 kg 1047 5666.36 5666.36
1.80 Pekerja OH 1.650 8.93 8.93
1
0.18 Mandor OH 0.083 0.45 0.45
0.10 Tukang Ba OH 0.275 1.49 1.49
143.18 Kepala Tu OH 0.028 0.15 0.15
Air Ltr 215 1163.58 1163.58
Unit Upah / bahanSatuan Koef. Vol x Koef Durasi Unit Upah / bahan
5 Pekerjaan Pengecatan
5.1 Pekerjaan Cat Dinding Dalam ex. 5.2 Pekerjaan Cat Plafond
Mowilex Cendana Cendana
Unit Upah / bahanSatuan Koef. Vol x Koef Durasi Unit Upah / bahan
50.22 Plamir Te kg 0.100 35.61 17.81 Plamir
2
21.06 Cat Dindi kg 0.260 92.59 46.30 Cat Plafo
0.73 Tukang Ca OH 0.063 22.44 11.22 Tukang Ca
0.81 Kepala Tu OH 0.0063 2.24 1.12 Kepala Tu
0.81 Pekerja OH 0.020 7.12 3.56 Pekerja
0.57 Mandor OH 0.003 0.89 0.45 Mandor
0.57
5 Pekerjaan Pengecatan
5.1 Pekerjaan Cat Dinding Dalam ex. 5.2 Pekerjaan Cat Plafond
Mowilex Cendana Cendana
Unit Upah / bahanSatuan Koef. Vol x Koef Durasi Unit Upah / bahan
43.38 Plamir Te kg 0.100 30.84 15.42 Plamir
2
18.19 Cat Dindi kg 0.260 80.17 40.09 Cat Plafo
0.63 Tukang Ca OH 0.063 19.43 9.71 Tukang Ca
0.70 Kepala Tu OH 0.0063 1.94 0.97 Kepala Tu
0.70 Pekerja OH 0.020 6.17 3.08 Pekerja
0.49 Mandor OH 0.003 0.77 0.39 Mandor
0.49
5 Pekerjaan Pengecatan
5.1 Pekerjaan Cat Dinding Dalam ex. 5.2 Pekerjaan Cat Plafond
Mowilex Cendana Cendana
Unit Upah / bahanSatuan Koef. Vol x Koef Durasi Unit Upah / bahan
43.38 Plamir Te kg 0.100 30.78 15.39 Plamir
2
18.19 Cat Dindi kg 0.260 80.03 40.02 Cat Plafo
0.63 Tukang Ca OH 0.063 19.39 9.70 Tukang Ca
0.70 Kepala Tu OH 0.0063 1.94 0.97 Kepala Tu
0.70 Pekerja OH 0.020 6.16 3.08 Pekerja
0.49 Mandor OH 0.003 0.77 0.38 Mandor
0.49
Tufur 12 Pekerjaan Instalasi Kabel Lampu 13
Unit Upah / bahanSatuan Koef. Vol x Koef Durasi Unit Upah / bahan
Kabel
81 Kabel 956.1 478.05
m 1 Stop
Lampu
2 Kontak
1.701 Tukang Listrik OH 0.021 20.0781 10.03905 Tukang Listrik
0.81 Pekerja OH 0.01 9.561 4.7805 Pekerja
1
6.6 Pekerja OH 0.010 0.03 0.03 Pekerja
Satuan Koef. Vol x Koef Durasi Unit Upah / bahanSatuan Koef. Vol x Koef
50.22 Waterpro
bh 3.100 kg 2.5
ofing
100.44 64.704
1
kg 0.260 44.13 44.13
OH 0.045 7.64 7.64
OH 0.0063 1.07 1.07
OH 0.020 3.39 3.39
OH 0.003 0.42 0.42
5.2 Pekerjaan Cat Plafond + List Plafond ex. Mowilex
Cendana
1
kg 0.260 44.13 44.13
OH 0.045 7.64 7.64
OH 0.0063 1.07 1.07
OH 0.020 3.39 3.39
OH 0.003 0.42 0.42
1
kg 0.260 44.13 44.13
OH 0.045 7.64 7.64
OH 0.0063 1.07 1.07
OH 0.020 3.39 3.39
OH 0.003 0.42 0.42
Pekerjaan Instalasi Kabel Stop Kontak 14 Pekerjaan Instalasi Kabel AC
Satuan Koef. Vol x Koef Durasi Unit Upah / bahanSatuan Koef. Vol x Koef
Perlengk
buah 0.025 0.3 0.3 apan % 6.000 72
(6%dari
bahan)
1
OH 0.010 0.12 0.12 Tukang B OH 1.450 17.4
Kepala
OH 0.400 4.8 4.8 Tukang OH 0.150 1.8
Batu
OH 0.040 0.48 0.48 Pekerja OH 1.200 14.4
OH 0.005 0.06 0.06 Mandor OH 0.060 0.72
eam 3.7 Pekerjaan Urugan Kembali Galian Tie Beam
Durasi Unit Upah / bahanSatuan Koef. Vol x Koef Durasi Unit Upah / bahan
690.18 Pekerja OH 0.250 5.27 5.27
1
1298.51 Mandor OH 0.013 0.27 0.27
1947.77
3
3.07
0.15
0.51
0.05
399.97
proofing Kamar
6 Pekerjaan Pengecatan
6.1 Pekerjaan Cat Dinding Dalam ex.
Mowilex Cendana
Durasi Unit Upah / bahanSatuan Koef. Vol x Koef Durasi Unit Upah / bahan
1
2
0.52 Cat Dindi kg 0.260 94.80 47.40
Perlengk
24 apan % 6.000 18 18
(6%dari
bahan)
3 1
5.8 Tukang B OH 1.450 4.35 4.35
Kepala
0.6 Tukang OH 0.150 0.45 0.45
Batu
4.8 Pekerja OH 1.200 3.6 3.6
0.24 Mandor OH 0.060 0.18 0.18
4 Pekerjaan Septictank
3.8 Pekerjaan Lantai Kerja t= 5cm untuk Lantai
4.1 Pekerjaan Galian Septictank
Dasar
Upah / bahanSatuan Koef. Vol x Koef Durasi Unit Upah / bahanSatuan Koef.
kg 230.00 2166.19 2166.19 Pekerja OH 0.750
Semen por
kg 893.00 8410.46 8410.46 Mandor OH 0.025
Pasir Bet
kg 1027 9672.50 9672.50
Batu Kora 1
Air ltr 200 1883.64 1883.64
Pekerja OH 1.20 11.30 11.30
Mandor OH 0.060 0.57 0.57
Tukang Ba OH 0.200 1.88 1.88
Kepala Tu OH 0.020 0.19 0.19
6.2 Pekerjaan Cat Dinding Luar ex. Mowilex 6.3 Pekerjaan Cat Plafond + List Plafond ex.
Weather Coat Cendana
Upah / bahanSatuan Koef. Vol x Koef Durasi Unit Upah / bahanSatuan Koef.
1
Cat Dindi kg 0.260 2.40 2.40 Cat Plafo kg 0.260
Tukang B Tukang B
Kepala 2
Tukang OH 0.015 0.045 0.0225 Kepala Tu OH 0.015
Batu
Vol x Koef Durasi Unit Upah / bahanSatuan Koef. Vol x Koef Durasi Unit
0.42 0.42
1
0.045 0.045
0.012 0.012
0.3 0.3
4.3 Pekerjaan Lantai Kerja Septictank 4.4 Pekerjaan Pasangan Bata Ringa
Upah / bahanSatuan Koef. Vol x Koef Durasi Unit Upah / bahanSatuan
41.75 41.75 Bata
kg 230.00 m³
Semen por Ringan
162.08 162.08 Perekat
kg 893.00 Sak
Pasir Bet Bata
186.40 186.40 Besi
Batu Kora kg 1027 Kg
1 Angkur
Air ltr 200 36.30 36.30 Pekerja OH
Pekerja OH 1.20 0.22 0.22 Tukang Ba OH
Mandor OH 0.060 0.01 0.01 Kepala Tu OH
Tukang Ba OH 0.200 0.04 0.04 Mandor OH
Kepala Tu OH 0.020 0.00 0.004
rjaan Pasangan Bata Ringan Septictank 4.5 Pekerjaan Plester Septictank
Koef. Vol x Koef Durasi Unit Upah / bahanSatuan Koef. Vol x Koef Durasi
0.100 1.65 1.65 Kg 6.912 114.05
Semen por
0.100 1.65 1.65 Pasir pas m³ 0.035 0.58
1
0.280 4.62 1 4.62 OH 0.400 6.60
Pekerja
0.200 3.30 3.30 Tukang Ba OH 0.200 3.30
0.100 1.65 1.65 Kepala Tu OH 0.020 0.33
0.010 0.17 0.17 Mandor OH 0.022 0.36
0.0100 0.17 0.17
5. Pekerjaan Pemadatan Tanah
Unit Upah / bahanSatuan Koef. Vol x Koef Durasi Unit Upah / bahan
114.05 OH 38.4 9.6 Tanah
Pekerja 0.500
4
0.58 OH 3.84 0.96
Mandor 0.050 Pekerja
6.60
Mandor
3.30
0.33
0.36
Satuan KoefisienVol x Koef Durasi Unit
m3 1.200
9.05 9.05286
OH
0.422 3.18 3.183589
OH
0.020 0.15 1 0.150881
183
NO PEKERJAAN HARGA
IPEKERJAAN PERSIAPAN Err:509
IIPEKERJAAN STRUKTUR BAWAH Err:509
IIIPEKERJAAN STRUKTUR ATAS Rp 2,113,978,368
IV PEKERJAAN ARSITEKTUR Err:509
V PEKERJAAN INSTALASI LISTRIK Err:509
VI PEKERJAAN INSTALASI AIR Err:509
VIIPEKERJAAN LAIN-LAIN Err:509
TOTAL Err:509
BIAYA PPN 10% Err:509
TOTAL + PPN Err:509
TOTAL + PPN / LUAS BANGUNAN Err:509
NO. JENIS PEKERJAAN HARGA SUB TOTAL
1 PEKERJAAN PERSIAPAN Err:509
2 PEKERJAAN STRUKTUR BAWAH Err:509
3 PEKERJAAN STRUKTUR ATAS Rp 2,113,978,368
4 PEKERJAAN ARSITEKTUR Err:509
5 PEKERJAAN INSTALASI LISTRIK Err:509
6 PEKERJAAN INSTALASI AIR Err:509
7 PEKERJAAN LAIN-LAIN Err:509
TOTAL Err:509
% biaya
% biaya kumulatif
Kebutuhan Biaya
Kebutuhan Biaya
Kumulatif
MEI JUNI
BOBOT (%)
1 2 3 4 1 2 3 4
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Kebutuhan Biaya
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Kebutuhan Biaya
Kumulatif
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
KURVA S
PROYEK PEMBANGUNAN RUKO TANJUNG DUREN
JAKARTA BARAT
Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
ANJUNG DUREN
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
DESEMBER JANUARI FEBRUARI
3 4 1 2 3 4 1 2 3 4
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
MARET
1 2 3
Err:509
Err:509 Err:509 Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
NO. JENIS PEKERJAAN HARGA SUB TOTAL
1 PEK. PERSIAPAN Err:509
2 PEK. STRUKTUR BAWAH Err:509
3 PEK. STRUKTUR ATAS LT.DASAR Rp 83,796,011
4 PEK. STRUKTUR ATAS LT.1 Rp 164,865,756
5 PEK. STRUKTUR ATAS LT.2 Rp 167,253,187
6 PEK. STRUKTUR ATAS LT.3 Rp 163,373,578
7 PEK. STRUKTUR ATAS LT.ATAP Rp 1,534,689,836
8 PEK. ARSITEKTUR LT.DASAR Err:509
9 PEK. ARSITEKTUR LT.1 Rp 337,289,824
10 PEK. ARSITEKTUR LT. 2 Rp 308,861,737
11 PEK. ARSITEKTUR LT. 3 Rp 306,023,596
12 PEK. ARSITEKTUR LT. ATAP Err:509
13 PEK. INSTALASI LISTRIK Err:509
14 PEK. INSTALASI AIR Rp 139,751,542
15 PEK. LAIN-LAIN Err:509
TOTAL Err:509
% biaya
% biaya kumulatif
Kebutuhan
Biaya
Kebutuhan Biaya
Kumulatif
MEI JUNI
BOBOT (%)
1 2 3 4 1 2
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
ya Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Kebutuhan
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Biaya
Kebutuhan Biaya
Kumulatif
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
KURV
PROYEK PEMBANGUNAN R
JAKARTA
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
KURVA S
PROYEK PEMBANGUNAN RUKO TANJUNG DUREN
JAKARTA BARAT
AGUSTUS SEPTEMBER
2 3 4 1 2 3 4
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
OKTOBER NOVEMBER
1 2 3 4 1 2 3
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
NOVEMBER DESEMBER JANUARI
4 1 2 3 4 1 2
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
JANUARI FEBRUARI MARET
3 4 1 2 3 4 1
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
MARET
2 3 4
Err:509
Err:509
Err:509
Err:509
Err:509