Anda di halaman 1dari 475

RENCANA ANGGARAN DAN BIAYA (RAB)

PEKERJAAN : PEMBANGUNAN RUKO


LOKASI : PASAR KLIWON SURAKARTA
TAHUN : 2013

HARGA SATUAN
NO URAIAN PEKERJAAN VOLUME JUMLAH TOTAL
PEKERJAAN

I PEKERJAAN PERSIAPAN
1 Pekerjaan pembersihan lapangan 1.000 ls Rp 250,000.00 Rp 250,000.00
2 Uitzet dan bouwplank 1.000 ls Rp 250,000.00 Rp 250,000.00
SUB JUMLAH I Rp 500,000.00
II PEKERJAAN TANAH
1 Galian Tanah 56.750 m3 Rp 18,410.00 Rp 1,044,767.50
2 Urugan tanah kembali 18.898 m3 Rp 6,710.00 Rp 126,803.90
SUB JUMLAH II Rp 1,171,571.40
III PEKERJAAN BETON
1 Foot plat 7.470 m3 Rp 3,989,137.50 Rp 29,798,857.13
2 Sloof 20/30 cm 2.320 m3 Rp 3,848,993.00 Rp 8,929,663.76
3 Kolom 20/30 cm 2.500 m3 Rp 3,989,137.50 Rp 9,972,843.75
4 Kolom 15/15 cm 1.800 m3 Rp 3,989,137.50 Rp 7,180,447.50
8 Balok 20/40 cm 1.400 m3 Rp 5,052,745.00 Rp 7,073,843.00
9 Balok 15/30 cm 0.760 m3 Rp 5,052,745.00 Rp 3,840,086.20
10 Balok 15/20 cm 2.680 m3 Rp 5,052,745.00 Rp 13,541,356.60
11 Ring Balok 15/20 cm 1.500 m3 Rp 5,052,745.00 Rp 7,579,117.50
12 Plat beton t=12 cm 5.750 m3 Rp 4,393,816.25 Rp 25,264,443.44
14 Beton rabat t = 10 cm 8.220 m3 Rp 615,445.00 Rp 5,058,957.90
SUB JUMLAH III Rp 118,239,616.77
IV PEKERJAAN PASANGAN
1 Pondasi batu kali 17.750 m3 Rp 486,940.00 Rp 8,643,185.00
2 Pasangan bata 1/2 bt 1 Pc : 4 Ps 326.230 m2 Rp 77,716.00 Rp 25,353,290.68
3 Plesteran dan acian 1 Pc : 4 Ps 652.460 m2 Rp 23,530.00 Rp 15,352,383.80
4 Pasang keramik lantai kamar mandi 20x20 cm 5.025 m2 Rp 84,947.48 Rp 426,861.06
5 Pasang keramik dinding kamar mandi 20x25 cm 10.500 m2 Rp 97,737.44 Rp 1,026,243.09
6 Pasang keramik lantai 30 x 30 cm 102.890 m2 Rp 128,647.48 Rp 13,236,538.70
SUB JUMLAH IV Rp 64,038,502.34
HARGA SATUAN
NO URAIAN PEKERJAAN VOLUME JUMLAH TOTAL
PEKERJAAN

V PEKERJAAN KUSEN, PINTU DAN JENDELA


1 Kusen pintu dan jendela kayu kamfer 6/12 0.720 m3 Rp 11,931,800.00 Rp 8,590,896.00
2 Daun pintu panil kayu 7.980 m2 Rp 561,100.00 Rp 4,477,578.00
3 Daun jendela kaca 6.960 m2 Rp 456,390.00 Rp 3,176,474.40
4 Pasang pintu lipat besi 1.000 bh Rp 4,000,000.00 Rp 4,000,000.00
SUB JUMLAH V Rp 20,244,948.40
VI PEKERJAAN ATAP DAN PLAFOND
1 Nok, gording, jurai kayu 8/12 0.580 m3 Rp 11,133,400.00 Rp 6,457,372.00
3 Usuk 5/7 kayu kamfer reng 3/4 jati 78.000 m2 Rp 234,814.00 Rp 18,315,492.00
4 Genteng press 78.000 m2 Rp 31,109.00 Rp 2,426,502.00
5 Kerpus 12.000 m' Rp 54,383.68 Rp 652,604.16
6 Papan ruiter 2/20 12.000 m' Rp 45,057.20 Rp 540,686.40
7 Lisplank 2/25 kayu kamfer 6.000 m' Rp 95,061.50 Rp 570,369.00
8 Plafond 55.000 m2 Rp 141,613.80 Rp 7,788,759.00
SUB JUMLAH VI Rp 36,751,784.56
VII PEKERJAAN INSTALASI LISTRIK
1 Instalasi titik lampu 12.000 ttk Rp 350,000.00 Rp 4,200,000.00
2 Instalasi stop kontak 6.000 ttk Rp 250,000.00 Rp 1,500,000.00
SUB JUMLAH VII Rp 5,700,000.00
VIII PEKERJAAN CAT-CATAN
1 Cat tembok 1 x saput dasar, 2 x penutup 707.460 m2 Rp 10,479.77 Rp 7,414,018.08
2 Cat kayu 66.640 m2 Rp 36,012.40 Rp 2,399,866.34
SUB JUMLAH VIII Rp 7,414,018.08

JUMLAH PEKERJAAN I s/d VIII Rp 254,060,441.56


DIBULATKAN Rp 254,060,000.00

Surakarta, April 2013

(…………………………………..)
DAFTAR HARGA DAN UPAH

PEKERJAAN : PEMBANGUNAN GUDANG DAN BALAI PERTEMUAN


LOKASI : TENONGAN GUPIT SUKOHARJO
TH. ANGGARAN : 2013

NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

TENAGA

1 Tukang kayu hari 47,500.00


2 Kepala tukang kayu hari 50,000.00
3 Tukang batu hari 45,000.00
4 Kepala tukang batu hari 47,500.00
5 Tukang besi hari 45,000.00
6 Kepala tukang besi hari 47,500.00
7 Tukang las hari 45,000.00
8 Kepala tukang las hari 47,500.00
9 Tukang cat hari 42,500.00
10 Kepala tukang cat hari 45,000.00
11 Tukang plitur hari 42,500.00
12 Kepala tukang plitur hari 45,000.00
13 Tukang bor hari 45,000.00
14 Kepala tukang bor hari 47,500.00
15 Tukang listrik hari 45,000.00
16 Tukanng pipa ledeng hari 45,000.00
17 Tukang kapur hari 45,000.00
18 Pekerja hari 35,000.00
19 Mandor hari 47,500.00
20 Pengawas / Ahli Teknik hari 50,000.00
21 Ahli ukur hari 116,300.00
22 Asisten ahli ukur hari 87,200.00
23 Sopir hari 35,000.00
24 Masinis hari 40,000.00
25 Kernet / pembantu sopir hari 30,000.00
26 Mekanik terlatih hari 40,000.00
27 Operator tak terlatih hari 30,000.00
28 Operator terlatih hari 50,000.00
29 Operator semi terlatih hari 40,000.00
30 Butuh terlatih hari 35,000.00
31 Buruh semi terlatih hari 32,000.00
32 Buruh tak terlatih hari 35,000.00
33 Tukang gali hari 35,000.00
34 Juru godog aspal hari 35,000.00
35 Penjaga hari 30,000.00
36 Penyemprot hari 25,000.00
37 Tukang Sungging hari 40,000.00
38 Kepala Tukang Sungging hari 45,000.00
39 Tukang Ukir hari 45,000.00
40 Kepala Tukang Ukir hari 50,000.00
41 Tukang Prodo hari 40,000.00
42 Kepala Tukang Prodo hari 45,000.00
43 Tukang Gambar hari 35,000.00
44 Tukang Grouting hari 35,000.00
45 Kepala tukang Grouting hari 40,000.00

Bahan - 3
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

46 Operator mesin sondir hari 75,000.00


47 Analis test sondir hari 120,000.00

CAT
1 Cat kayu se kualitas Patna kg 10,450.00
2 Cat kayu se kualitas Emco biasa kg 32,000.00
3 Cat kayu se kualitas Emco Bintang kg 42,000.00
4 Cat kayu se kualitas Par kg 10,450.00
5 Cat besi se kualitas Patna kg 10,450.00
6 Cat besi se kualitas Emco biasa kg 39,000.00
7 Cat besi se kualitas Emco Bintang kg 42,000.00
8 Cat kayu se kualitas Avian kg 24,750.00
9 Cat tembok/cat semen Maxilite kg 8,000.00
10 Cat tembok/cat emulsi dasar minyak Express kg 8,250.00
11 Cat tembok/cat polivynyl asetat Dulux kg 25,000.00
12 Cat tembok/cat kilap/cat acrilyc Dulux kg 35,000.00
13 Cat ICI Catylac kg 13,600.00
14 Cat Tembok Catylac Biasa kg 13,600.00
15 Cat Tembok Catylac Bintang kg 13,600.00
16 Cat Tembok Mowilek Dalam kg 33,000.00
17 Cat Tembok Mowilek Luar kg 52,600.00
18 Cat Tembok Dulux Dalam kg 40,000.00
19 Cat Tembok Dulux Luar kg 62,800.00
20 Cat tembok se kualitas Decolith kg 15,500.00
21 Cat Sintex kg 7,500.00
22 Cat dasar meni besi type A (cepat kering) Jago kg 13,000.00
23 Cat dasar meni besi type A (cepat kering) Par kg 20,000.00
24 Cat dasar meni kayu Jago kg 12,000.00
25 Cat duco kg 60,000.00
26 Cat genteng air ICI weathershield kg 42,000.00
27 Cat dasar undercoat / alkali resisiting primer kg 27,200.00
28 Cat dinding weathershield Dulux kg 50,000.00
29 Cat dasar kayu, besi dan genteng kg 29,700.00
30 Cat meni kayu, besi dan genteng kg 13,700.00
31 Cat Besi kg 41,745.00
32 Cat Brom kg 27,000.00
33 Dempul kayu typa A (putih) Jago kg 10,000.00
34 Dempul lilin / kayu bj 9,000.00
35 Dempul Kayu unit 17,820.00
36 Plamur Fuji kg 10,500.00
37 Plamur kayu Jago kg 12,000.00
38 Plamur tembok acrilyc kg 17,500.00
39 Plamur jenis sirlak kuning ltr 17,500.00
40 Sirlak putih batangan kg 65,000.00
41 Sirlak kuning serbuk kg 65,000.00
42 Oker kuning kg 12,000.00
43 Oker hitam kg 9,500.00
44 Oker pewarna politur merah / coklat bks 1,200.00
45 Kalkarium kg 5,000.00
46 Politur jadi ltr 50,000.00
47 Teak oil Fuji ltr 27,500.00
48 Pernis ltr 12,500.00
49 Glass bit ltr 12,000.00
50 Thermo plastik / cat marka kg 49,000.00

Bahan - 4
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

51 Cat rettar kg 49,000.00


52 Terpentin ltr 115,000.00
53 Minyak cat ltr 10,000.00
54 Thinner ltr 13,000.00
55 Spiritus ltr 6,500.00
56 Batu kambang kg 7,700.00
57 Kuas roll bh 9,000.00
58 Kuas ukuran 3,5" bh 8,000.00
59 Kuas ukuran 2,5" bh 5,000.00
60 Kuas 5" bh 6,600.00
61 Kuas 2" bh 3,300.00
62 Kuas ukuran kecil 1" bh 2,000.00
63 Soda api kg 15,000.00
64 Sabun deterjen kg 12,000.00
65 Amplas lbr 3,000.00
66 Prodo Mas m2 3,000,000.00
67 Kertas 100 x 100 cm lbr 2,000.00
68 Karbon lbr 3,500.00

BETON DAN BARANG DARI BETON


BATAKO
1 Batako pejal ( 40x20x10 ) bj 2,750.00
2 Batako beton berlubang ( 40x20x15 ) bh 2,500.00
3 Panel beton pracetak lbr 175,000.00
4 Kolom beton pracetak btg 250,000.00

PIPA
1 Pipa beton 20 x 30 0anjang 1 m m 28,000.00
2 Pipa beton tanpa tulangan dia. 20 cm panjang 1 m m 24,000.00
3 Pipa beton tanpa tulangan dia. 30 cm panjang 1 m m 25,000.00
4 Pipa beton tanpa tulangan dia. 60 cm panjang 0,5 m m 28,000.00
5 Pipa beton tanpa tulangan dia. 80 cm panjang 0,5 m m 32,000.00
6 Pipa beton tanpa tulangan 1/2 dia. 20 cm m 12,000.00

BUIS BETON / KERB


### Buis beton bulat dia. 25 cm 1 m bh 32,500.00
### Buis beton bulat dia. 30 cm m 1
30,000.00
### Buis beton bulat dia. 40 cm m1 33,000.00
### Buis beton bulat dia. 50 cm P=1 m bh 72,000.00
### Buis beton bulat dia. 50 cm P=0,50 m bh 26,000.00
### Buis beton bulat dia. 60 cm P=0,50 m bh 30,000.00
### Buis beton bulat dia. 80 cm P=0,5 m bh 40,000.00
### Buis beton bulat dia. 100 cm P=0,5 m bh 120,000.00
### Buis beton oval dia. 20/30 panjang 1 m m1 30,000.00
### Buis beton oval dia. 25/37,5 panjang 1 m m1 35,000.00
### Buis beton oval dia. 30/40, 30/45 panjang 1 m m 1
45,000.00
### Buis beton oval dia. 35/52,5 panjang 1 m m1 65,000.00
### Buis beton oval dia. 40/60 panjang 1 m m1 50,000.00
### Buis beton oval dia. 50/75 panjang 0,5 m bh 35,000.00
### Buis beton oval dia. 60/90 panjang 0,5 m bh 38,000.00
### Buis beton oval dia. 70/105 panjang 0,5 m bh 47,000.00
### Buis beton oval dia. 80/120 panjang 0,5 m bh 55,000.00
### Buis beton diameter 60 cm bh 30,000.00

Bahan - 5
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

PERALATAN SANITASI
BAK MANDI
1 Bak mandi teraso uk. 50x50x50 cm bh 150,000.00
2 Bak mandi teraso uk. 60x60x60 cm bh 175,000.00
3 Bak mandi teraso uk. 90x80x80 cm bh 220,000.00
4 Bak mandi (bathtube) dengan shower lux bh 3,250,000.00
5 Bak mandi (bathtube) standar bh 2,475,000.00
6 Bak mandi fiber glass 0,30 m3 bh 275,000.00
7 Bak mandi fiber glass 0,50 m3 bh 825,000.00

KLOSET
1 Kloset jongkok porselin type CE7 standar bh 75,000.00
2 Kloset jongkok porselin type CE8 standar bh 85,000.00
3 Kloset jongkok putih INA bh 65,000.00
4 Kloset jongkok warna INA bh 75,000.00
5 Kloset duduk standar / porselin ( dengan tangki KIA st bh 950,000.00
6 Kloset duduk porselin lux ( dengan tangki "Toto" ) bh 1,250,000.00
7 Kloset duduk putih dengan tangki "Toto" set 1,250,000.00
8 Kloset duduk warna dengan tangki "Toto" set 1,450,000.00
9 Kloset duduk putih dengan tangki "KIA" set 700,000.00
10 Kloset duduk warna dengan tangki "KIA" set 925,000.00
11 Kloset duduk lengkap INA bh 1,250,000.00
12 Kloset jongkok bh 140,000.00
13 Kloset jongkok standar / keramik bh 55,600.00
14 Kloset jongkok teraso bh 25,000.00

WASTAFEL
1 Wastafel standar INA bh 255,000.00
2 Wastafel lux INA bh 265,000.00
3 Wastafel putih (KIA) set 139,150.00
4 Wastafel warna (KIA) set 271,340.00
5 Badkip bh 150,000.00
6 Bak cuci stainless steel bh 500,000.00
7 Water drain + asesories set 75,000.00

URINOIR
1 Urinoir standar TOTO U 57 set 785,000.00
2 Urinoir putih set 1,550,000.00
4 Urinoir warna (KIA) set 379,500.00
5 Meja cuci dapur 125 x 50 cm bh 175,000.00
6 Tempat sabun tunggal bh 22,500.00
7 Kran air diameter 3/4" atau 1/2" bh 25,000.00
8 Seal tape bh 2,500.00
9 Floordrain bh 55,000.00

BATA HALAMAN / PAVING BLOCK


1 WARNA NATURAL / ABU-ABU
2 Tipe segi empat (holland/balok),uni/tikar,segi 6 besa m2 55,500.00
3 Tipe segi enam kecil tebal 8 cm K 350-400 m 2
55,500.00
4 Tipe CBI tebal 8 cm K350-400 m 2
55,500.00
5 Tipe Kewung tebal 8 cm K350-400 m2 58,000.00
6 Tipe uni dan segi empat tebal = 8 cm K 300 m2 50,400.00
7 Tipe Holland/balok tebal 8cm K250-300 m 2
48,150.00

Bahan - 6
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

8 Tipe Kipas/Omega tebal 8cm K250-300 m2 47,000.00


9 Tipe Uni/tikar kecil tebal 8 cm K250-300 m 2
48,000.00
10 Tipe segienam besar tebal 8 cm K250-300 m2 48,025.00
11 Tipe Segi enam sedang/bergaris t = 6 cm K250-300) m² 35,000.00
12 Tipe Segi enam sedang/bergaris t = 8 cm K250-300 m² 43,000.00
13 Tipe Segi enam kecil t = 8 cm K250-300 m² 48,020.00
14 Tipe Beteng t = 6 cm K250-300 m² 35,000.00
15 Tipe Grass blok t = 8 cm K250-300 biji 7,800.00
16 Tipe Spilt blok t = 3 cm K250-300 biji 2,780.00
17 Tipe Batako t = 10 cm K250-300 biji 2,720.00
18 Tipe Kotak t = 8 cm K250-300 biji 6,500.00
19 Tipe CB1 t = 8cm K250-300 m² 47,000.00
20 Tipe CB2 t = 6 cm K250-300 m² 35,000.00
21 Tipe Kubus t = 6 cm K250-300 m² 35,000.00
22 Tipe Kubus t = 8 cm K250-300 m² 43,000.00
23 Tipe Kelelawar t = 6 cm K250-300 m² 35,000.00
24 Tipe Kewung t = 8 cm K250-300 m² 55,500.00
25 Tipe segi empat (holland/balok) tebal = 6 cm K 200 m2 36,450.00
26 Tipe segi empat (holland/balok) tebal = 8 cm K 200 m2 44,550.00
27 Tipe segi enam besar tebal = 6 cm K 200 m 2
36,380.00
28 Tipe segi enam kecil tebal = 6 cm K 200 m 2
36,400.00
29 Tipe segi enam besar tebal = 8 cm K 200 m2 44,540.00
30 Tipe segi enam kecil tebal = 8 cm K 200 m2 44,520.00
31 Tipe uni / tikar tebal = 6 cm K200 m 2
36,400.00
32 Tipe uni / tikar tebal = 8 cm K 200 m2 44,600.00
33 Tipe trihex / sarang lebah tebal = 6 cm K 200 m2 36,400.00
34 Tipe lampion kotak tebal = 8 cm K 200 m 2
44,460.00
35 Tipe lampion kotak tebal = 6 cm K 200 m 2
36,480.00
36 Tipe lampion bulat tebal = 6 cm K 200 m2 36,500.00
37 Tipe beteng kecil tebal = 6 cm K 200 m 2
36,400.00
38 Tipe beteng kecil tebal = 8 cm K 200 m 2
46,700.00
39 Tipe kipas tebal = 8 cm K 200 m2 44,600.00
40 Tipe kipas/omega tebal = 6 cm K 200 m 2
36,400.00
41 Tipe mawar/kombinasi tebal 6 cm K175-200 m 2
36,400.00
42 Tipe topi Uskup t = 6 cm K175-200 m² 36,400.00
43 Tipe topi Uskup t = 8 cm K175-200 m² 44,460.00
44 Tipe Segi delapan besar t = 6 cm K175-200 m² 36,435.00
45 Tipe Segi delapan kecil t = 6 cm K175-200 m² 36,500.00
46 Tipe Wajik komb.besar t = 6 cm K175-200 m² 36,540.00
47 Tipe Wajik komb.kecil t = 6 cm K175-200 m² 36,480.00
48 Tipe grass blok tebal 10cm K175-200 m² 39,000.00
49 Tipe CB1 tebal 8 cm K175-200 m² 43,000.00
50 Tipe Kawung tebal 8 cm K175-200 m² 47,000.00

WARNA MERAH / HITAM


1 Tipe segi 4 (holland/balok),uni/tikar,segi 6 bsr-kcl t m2 63,000.00
2 Tipe CBI tebal 8 cm warna K350-400 m 2
63,000.00
3 Tipe Kewung tebal 8 cm warna K350-400 m2 63,500.00
4 Tipe uni/tikar dan segi empat (holland/balok) t = 8 m2 55,000.00
5 Tipe Kipas t = 6 cm K250-300 m2 42,000.00
6 Tipe Kipas t = 8 cm K250-300 m2 55,000.00
7 Tipe CB1 t = 8 cm K250-300 m² 55,000.00

Bahan - 7
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

8 Tipe CB2 t = 6 cm K250-300 m² 42,000.00


9 Tipe Segi enam besar t = 8 cm K250-300 m² 55,000.00
10 Tipe Segi enam kecil t = 8 cm K250-300 m² 55,000.00
11 Tipe Segi enam sedang/bergaris t = 6 cm K250-300 m² 42,000.00
12 Tipe Segi enam sedang/bergaris t = 8 cm K250-300 m² 51,000.00
13 Tipe topi Uskup besar t = 8 cm K250-300 biji 3,200.00
14 Tipe Kewung t = 8 cm K250-300 m² 60,500.00
15 Tipe Kelelawar t = 6 cm K250-300 m² 42,000.00
16 Tipe Sarong lebah t = 6 cm K250-300 m² 42,000.00
17 Tipe Sarong lebah t = 8 cm K250-300 m² 51,000.00
18 Tipe Beteng kecil t = 6 cm K250-300 m² 42,000.00
19 Tipe Kubus t = 6 cm K250-300 m² 42,000.00
20 Tipe Kubus t = 8 cm K250-300 m² 51,000.00
21 Tipe segi empat tebal = 6 cm warna K 200 m2 43,500.00
22 Tipe segi empat (holland/balok) tebal = 8 cm warna m 2
51,000.00
23 Tipe segi enam tebal = 6 cm warna K 200 m 2
43,500.00
24 Tipe segi enam besar tebal = 8 cm warna K 200 m2 51,000.00
25 Tipe segi enam kecil tebal = 8 cm warna K 200 m2 51,000.00
26 Tipe uni / tikar tebal = 6 cm warna K200 m 2
43,500.00
27 Tipe uni / tikar tebal = 8 cm warna K 200 m2 51,000.00
28 Tipe trihex / sarang lebah tebal = 6 cm warna K 200 m2 43,500.00
29 Tipe lampion tebal = 8 cm warna K 200 m 2
52,000.00
30 Tipe beteng kecil tebal = 6 cm warna K 200 m2 43,500.00
31 Tipe beteng kecil tebal = 8 cm warna K 200 m2 52,000.00
32 Tipe kipas tebal = 8 cm warna K 200 m 2
52,000.00
33 Tipe grass blok bulat tebal = 10 cm m 2
41,400.00
34 Tipe grass blok tebal = 10 cm m2 41,400.00
35 Tipe CB1 tebal 8 cm K175-200 m² 51,000.00
36 Tipe Kawung tebal 8 cm K175-200 m² 52,000.00

ASBES
1 Asbes plat ( 100 x 100 x 0,3 ) lbr 10,000.00
2 Asbes plat ( 200 x 100 x 0,3 ) lbr 19,000.00
3 Asbes plat ( 100 x 100 x 0,6 ) lbr 17,500.00
4 Asbes plat ( 100 x 100 x 0,5 ) lbr 15,000.00
5 Asbes plat ( 100 x 100 x 0,4 ) lbr 12,500.00
6 Asbes plat ( 100 x 100 x 0,35 ) lbr 11,000.00
7 Asbes plat ( 100 x 100 x 0,32 ) lbr 10,000.00

8 Asbes gelombang besar ( 300 x 110 x 0,5 ) lbr 90,275.00


9 Asbes gelombang besar ( 250 x 110 x 0,5 ) lbr 74,900.00
10 Asbes gelombang besar ( 225 x 110 x 0,5 ) lbr 67,100.00
11 Asbes gelombang besar ( 200 x 110 x 0,5 ) lbr 74,900.00
12 Asbes gelombang besar ( 180 x 110 x 0,5 ) lbr 57,354.00
13 Asbes gelombang besar ( 150 x 110 x 0,5 ) lbr 45,650.00
14 Asbes gelombang besar ( 100 x 100 x 0,28 ) lbr 9,300.00
15 Asbes gelombang besar ( 100 x 200 x 0,28 ) lbr 19,725.00
16 Asbes gelombang besar ( 0,06 x 200 x 0,28 ) lbr 12,025.00
17 Asbes gelombang besar ( 0,05 x 200 x 0,28 ) lbr 10,000.00
18 Asbes gelombang besar ( 0,04 x 200 x 0,28 ) lbr 8,000.00
19 Asbes gelombang besar ( 0,03 x 200 x 0,28 ) lbr 6,325.00
20 Asbes gelombang besar ( 300 x 92 x 0,5 ) lbr 75,495.00

Bahan - 8
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

21 Asbes gelombang besar ( 250 x 92 x 0,5 ) lbr 62,960.00


22 Asbes gelombang besar ( 225 x 92 x 0,5 ) lbr 56,620.00
23 Asbes gelombang besar ( 200 x 92 x 0,5 ) lbr 50,330.00
24 Asbes gelombang besar ( 180 x 92 x 0,5 ) lbr 45,290.00
25 Asbes gelombang besar ( 300 x 108 x 0,6 ) lbr 112,830.00
26 Asbes gelombang besar ( 270 x 108 x 0,6 ) lbr 101,500.00
27 Asbes gelombang besar ( 240 x 108 x 0,6 ) lbr 90,265.00
28 Asbes gelombang besar ( 210 x 108 x 0,6 ) lbr 78,980.00
29 Asbes gelombang besar ( 180 x 108 x 0,6 ) lbr 67,690.00
30 Asbes gelombang kecil ( 300 x 105 x 0,4 ) lbr 71,350.00
31 Asbes gelombang kecil ( 270 x 105 x 0,4 ) lbr 69,250.00
32 Asbes gelombang kecil ( 210 x 105 x 0,4 ) lbr 57,500.00
33 Asbes gelombang kecil ( 180 x 105 x 0,4 ) lbr 42,850.00
34 Asbes gelombang kecil ( 150 x 105 x 0,4 ) lbr 35,950.00
35 Asbes gelombang kecil ( 240 x 105 x 0,4 ) lbr 61,000.00
36 Asbes nok gelombang besar lbr 29,000.00
37 Asbes nok gelombang kecil lbr 23,000.00
38 Nok paten lbr 50,000.00
39 Nok stel rata lbr 25,000.00
40 Asbes Penutup langit-langut 3 mm, 100 x 100 lbr 12,650.00

GENTENG
1 Genteng beton besar natural 1m 9 biji bh 2,750.00
2 Genteng beton besar warna 1m 9 biji bh 4,420.00
3 Genteng beton kecil natural 1m 11 biji bh 2,350.00
4 Genteng beton kecil warna 1m 11 biji bh 3,950.00
5 Genteng beton kecil natural 1m 20 biji bh 2,000.00
6 Genteng beton kecil warna 1m 20 biji bh 2,640.00
7 Genteng bubungan beton bh 2,460.00
8 Genteng Wuwung warna bh 4,260.00
9 Nok press beton bh 37,000.00
10 Genteng Beton Besar bh 2,650.00
11 Genteng Beton Kecil bh 2,750.00

BAHAN KERAMIK
PIPA
1 Pipa tanah liat dia. 10 cm bh 7,500.00
2 Pipa tanah dia. 15 cm bh 25,000.00
3 Pipa tanah dia. 20 cm bh 35,000.00
4 Pipa tanah liat leher angsa bh 8,500.00

GENTENG & NOK


1 Genteng keramik lengkung cekung / vlaams bh 600.00
2 Genteng keramik lengkung rata bh 450.00
3 Genteng keramik rata / kodok bh 1,500.00
4 Genteng keramik berglasir KIA, Kanmuri Natural bh 4,500.00
5 Genteng monier bh 2,000.00
6 Genteng paris bh 1,100.00

7 Nok genteng vlaams tanah liat bh 4,000.00


8 Nok genteng kodok bh 3,000.00
9 Nok genteng kodok berglasir bh 6,050.00
10 Nok genteng vlaams berglasir bh 6,050.00
11 Nok genteng paris bh 1,650.00

Bahan - 9
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

12 Nok genteng keramik berglasir KIA, Kanmuri Natural bh 13,500.00


13 Genteng fiber semen 1150 x 850 x 4 mm lbr 23,775.00
14 Genteng fiber semen asbes nok kecil bh 19,350.00
15 Genteng fiber semen asbes nok besar bh 43,675.00
16 Genteng tanah liat kodok bh 569.25
17 Genteng KIA warna bh 4,950.00

ATAP GENTENG METAL


1 Genteng metal Zinc Alume type Prima Roof m2 95,400.00
2 Genteng metal Zinc Alume type Prima Colour m 2
77,760.00
3 Genteng metal Zinc Alume type Super Colour m2 54,000.00
4 Atap metal gelombang t 0,35 mm m2 60,000.00
5 Nok atas (U) type Prima Roof ( 110 x 5 x 6 ) cm bh 35,000.00
6 Nok atas (U) type Prima Colour ( 110 x 5 x 6 ) cm bh 25,000.00
7 Nok atas (U) type Super Colour ( 110 x 5 x 6 ) cm bh 22,000.00
8 Nok atas bulat (C) type Prima Roof, P = 40 cm bh 25,000.00
9 Nok atas bulat (C) type Prima Colour, P = 40 cm bh 20,000.00
10 Nok atlas bulat (C) type Super Colour, P = 40 cm bh 20,000.00
11 Nok pinggir (P) type Prima Roof ( 110 x 7 x 10 ) cm bh 40,000.00
12 Nok pinggir (P) type Prima Colour ( 110 x 7 x 10 ) cm bh 38,000.00
13 Nok pinggir (P) type Super Colour ( 110 x 7 x 10 ) cm bh 28,000.00
14 Wall Flashing type Prima Roof, P = 110 cm, L = 10 cm bh 38,000.00
15 Wall Flashing type Prima Colour, P = 110 cm, L = 10 bh 32,000.00
16 Wall Flashing type Super Colour, P = 110 cm, L = 10 bh 27,000.00
17 Paku anti karat kg 20,000.00
18 Atap polykarbonat m2 225,000.00
19 Paku skrup anti karat atap metal/polykarbonat bh 1,200.00

KERAMIK BERMOTIF
1 Tegel keramik Roman Bella (25 x 25) dos 47,500.00
2 Tegel keramik Roman Bella (10 x 25) dos 38,000.00
3 Tegel keramik Roman Alice (20 x 20) dos 38,500.00
4 Tegel keramik Roman Latanza (20 x 25) dos 38,000.00
5 Tegel keramik Roman Latanza (8 x 20) bj 20,000.00
6 Tegel keramik Roman Tulip (20 x 25) dos 37,500.00
7 Tegel keramik Roman Tulip (8 x 20) bj 14,000.00
8 Tegel keramik Roman Milano (20 x 25) dos 38,000.00
9 Tegel keramik Roman Milano (8 x 20) bj 20,000.00
10 Sablon/Antik 20/20 m2 125,000.00
11 Marblon/Kembang ukuran tipe 20/20 m2 45,000.00
12 Marblon/Kembang ukuran tipe 30/30 m2 50,000.00
13 Marblon/Kembang plint ukuran tipe 20/20 bh 1,950.00
14 Marblon/Kembang plint ukuran tipe 15/20 bh 1,685.00
15 Marblon/Kembang plint ukuran tipe 10/20 bh 1,170.00
16 Marblon/Kembang plint ukuran tipe 30/30 bh 5,000.00
17 Marblon/Kembang plint ukuran tipe 15/30 bh 2,840.00
18 Marblon/Kembang plint ukuran tipe 10/30 bh 1,970.00

ISOLATOR
1 Isolator keramik bentuk rol bh 6,600.00
2 Isolator keramik bentuk T - I bh 1,650.00
3 Isolator keramik bentuk sungkup bh 1,650.00

TEGEL / KERAMIK

Bahan - 10
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

1 Tegel/Ubin teraso 30/30 m2 32,000.00


2 Tegel abu-abu 11/11 m 2
45,000.00
3 Tegel abu-abu 15/15 m2 42,500.00
4 Tegel abu-abu 20/20 m2 20,000.00
5 Ubin semen kelabu rata 20/20 m 2
20,000.00
6 Ubin semen kelabu rata 30/30 m2 32,000.00
7 Ubin semen berwarna satu rata 20/20 m2 25,000.00
8 Tegel warna 11/11 m 2
55,000.00
9 Tegel warna 15/15 m 2
50,000.00
10 Tegel warna 20/20 m2 26,000.00
11 Tegel abu-abu 30/30 m 2
28,000.00
12 Plint tegel abu-abu 15/20 bh 525.00
13 Tegel warna 20/20 m2 26,000.00
14 Tegel warna 30/30 m 2
37,600.00
15 Plint tegel abu-abu 11/11 bh 685.00
16 Plint tegel abu-abu 15/15 bh 1,060.00
17 Plint tegel abu-abu 20/20 bh 1,150.00
18 Plint tegel abu-abu 30/30 bh 3,250.00
19 Plint tegel abu-abu 15/30 bh 1,920.00
20 Plint tegel abu-abu 10/20 bh 350.00
21 Plint tegel abu-abu 10/30 bh 750.00
22 Plint tegel warna 10/20 bh 400.00
23 Plint tegel warna 10/30 bh 825.00
24 Plint tegel warna 11/11 bh 740.00
25 Plint tegel warna 15/15 bh 1,150.00
26 Plint tegel warna 20/20 bh 1,600.00
27 Plint tegel warna 15/20 bh 1,410.00
28 Plint tegel warna 30/30 bh 4,250.00
29 Plint tegel warna 15/30 bh 2,510.00

30 Tegel porselin 11/11 m2 40,500.00


31 Tegel keramik 10/20 berglasir m2 40,250.00
32 Tegel keramik 20/20 berglasir m 2
40,250.00
33 Tegel keramik 30/30 berglasir m 2
40,250.00
34 Tegel keramik 20/25 m2 40,250.00
35 Tegel keramik 40/40 berglasir m 2
45,000.00
36 Keramik Putih 30/30 m 2
35,000.00
37 Tegel keramik standar ( MULIA) 20/20 dan 30/30 m2 42,500.00
38 Tegel keramik mosaik m2 60,000.00
39 Stepnosing granito bh 9,350.00
40 List keramik dinding motif 5/20 bh 7,500.00
41 Plint keramik 10 x 30 bh 1,750.00
42 Keramik dinding 20/25 m2 42,500.00

KERB TAMAN
1 Devider Mutiara m 66,000.00
2 Devider /kans teen tebal 30 Mutiara m 22,000.00
3 Devider /kans teen tebal 25 Mutiara m 18,800.00
4 Devider /kans teen tebal 20 Mutiara bh 15,300.00
5 Devider /kans teen tebal 15 Mutiara bh 11,250.00
6 Ram ukuran tipe 65 x 20 x 30 bh 29,700.00

Bahan - 11
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

7 Ramp ( terpasang ) bh 26,000.00


8 Devider terpasang bh 30,000.00
9 Kerb terpasang bh 28,000.00
10 Kerb ukuran tipe 60 x 32 x 35 bh 27,500.00
11 Kerb ukuran tipe 50 x 31 x 35 bh 27,500.00
12 Kerb ukuran tipe 50 x 35 x 15 bh 13,200.00
13 Kerb ukuran tipe 50 x 20 x 20 bh 13,750.00
14 Kerb ukuran tipe 50 x 30 x 15 bh 12,400.00
15 Kerb ukuran tipe 40 x 20 x 15 bh 5,750.00
16 Kerb ukuran tipe 40 x 40 x 42 bh 25,000.00
17 Kerb ukuran tipe 40 x 35 x 15 bh 11,000.00
18 Kerb ukuran tipe 50 x 30 x (30/18) bh 32,450.00
19 Ukuran tipe 5 x 30 x 10 bh 13,200.00

KAYU
1 KAYU JATI
2 Kayu jati balok 8/12 ( klas plitur ) m3 20,000,000.00
3 Kayu jati papan m 3
22,000,000.00
4 Balok kayu kelas I ukuran 8/12 m1 192,000.00
5 Balok kayu kelas I ukuran 8/10 m1 160,000.00
6 Balok kayu kelas I ukuran 6/12 m 1
144,000.00
7 Balok kayu kelas I ukuran 6/10 m1 120,000.00
8 Balok kayu kelas I ukuran 6/8 m1 96,000.00
9 Bingkai kayu kelas I ukuran 5/7 m 1
70,000.00
10 Bingkai kayu kelas I ukuran 4/6 m 1
48,000.00
11 Bingkai kayu kelas I ukuran 3/4, 3/5 m1 24,000.00
12 Bingkai kayu kelas I ukuran 2/3 m 1
12,000.00
13 Papan kayu kelas I ukuran 3/20 m 1
132,000.00
14 Papan kayu kelas I ukuran 3/18 m1 118,800.00
15 Papan kayu kelas I ukuran 2/25 m 1
110,000.00
16 Papan kayu kelas I ukuran 2/20 m 1
88,000.00
17 Papan kayu kelas I ukuran 2/15 m1 66,000.00
18 Lis Dan jalusi kayu kelas I ukuran 2/6 m1 24,000.00
19 Lis Dan jalusi kayu kelas I ukuran 2/4 m 1
16,000.00
20 Lis Dan jalusi kayu kelas I ukuran 1/5 m1 10,000.00
21 Lis Dan jalusi kayu kelas I ukuran 1/3 m1 6,000.00
22 Kayu jati balok 8/12 (lokal) m 3
16,500,000.00
23 Kayu jati papan (lokal) m 3
18,700,000.00
24 Kaui jati lokal ukuran 5/7 m1 57,750.00
25 Kayu jati lokal ukuran 2/3 m 1
9,900.00
26 Kayu jati lokal ukuran 3/4 m 1
19,800.00
27 Kayu Jati Papan Kelas I m3 28,601,000.00
28 Kayu Jati Balok Kelas I m 3
26,694,000.00
29 Kayu Jati Papan Kelas II m 3
20,974,000.00
30 Kayu Jati Balok Kelas II m3 19,067,400.00
31 Kayu Jati Papan Kelas III m3 15,889,500.00
32 Kayu Jati Balok Kelas III m 3
13,982,800.00
33 Kayu Jati Reng Kelas III m3 11,440,400.00

KAYU KAMPER

Bahan - 12
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

1 Kayu kamper balok m3 9,250,000.00


2 Kayu kamper papan m 3
8,000,000.00
3 Balok kayu kelas I ukuran 8/12 m1 88,800.00
4 Balok kayu kelas I ukuran 8/10 m1 74,000.00

5 Balok kayu kelas I ukuran 6/12 m1 66,600.00


6 Balok kayu kelas I ukuran 6/10 m 1
55,500.00
7 Balok kayu kelas I ukuran 6/8 m1 44,400.00
8 Bingkai reng & kaso kayu kelas I ukuran 5/7 m1 32,375.00
9 Bingkai reng & kaso kayu kelas I ukuran 4/6 m 1
22,200.00
10 Bingkai reng & kaso kayu kelas I ukuran 3/4 m1 11,100.00
11 Bingkai reng & kaso kayu kelas I ukuran 2/3 m1 5,550.00
12 Papan kayu kelas I ukuran 2/15 m 1
24,000.00
13 Papan kayu kelas I ukuran 2/20 m 1
32,000.00
14 Papan kayu kelas I ukuran 2/25 m1 40,000.00
15 Papan kayu kelas I ukuran 3/18 m 1
43,200.00
16 Papan kayu kelas I ukuran 3/20 m 1
48,000.00
17 Papan kayu kelas I ukuran 3/30 m1 72,000.00
18 Lis Dan jalusi kayu kelas I ukuran 1/3 m 1
2,775.00
19 Lis Dan jalusi kayu kelas I ukuran 1/5 m 1
4,625.00
20 Lis Dan jalusi kayu kelas I ukuran 2/4 m1 5,550.00

KAYU BENGKIRAI
1 Kayu bengkirai balok m3 7,800,000.00
2 Kayu bengkirai papan m3 8,200,000.00
3 Balok kayu kelas I ukuran 8/12 m 1
74,880.00
4 Balok kayu kelas I ukuran 8/10 m 1
62,400.00
5 Balok kayu kelas I ukuran 6/12 m1 56,160.00
6 Balok kayu kelas I ukuran 6/10 m1 46,800.00
7 Balok kayu kelas I ukuran 6/8 m 1
37,440.00
8 Bingkai reng & kaso kayu kelas I ukuran 5/7 m1 27,300.00
9 Bingkai reng & kaso kayu kelas I ukuran 4/6 m1 18,720.00
10 Bingkai reng & kaso kayu kelas I ukuran 3/4 m 1
9,360.00
11 Bingkai reng & kaso kayu kelas I ukuran 2/3 m1 4,680.00
12 Papan kayu kelas I ukuran 2/15 m1 24,600.00
13 Papan kayu kelas I ukuran 2/20 m 1
32,800.00
14 Papan kayu kelas I ukuran 2/25 m 1
41,000.00
15 Papan kayu kelas I ukuran 3/18 m1 44,280.00
16 Papan kayu kelas I ukuran 3/20 m 1
49,200.00
17 Papan kayu kelas I ukuran 3/30 m 1
73,800.00
18 Lis Dan jalusi kayu kelas I ukuran 1/3 m1 2,340.00
19 Lis Dan jalusi kayu kelas I ukuran 1/5 m1 3,900.00
20 Lis Dan jalusi kayu kelas I ukuran 2/4 m 1
6,240.00
21 Kayu Bengkirai Papan m3 5,500,000.00
22 Kayu Bengkirai Balok m3 5,300,000.00

KAYU KRUING
1 Kayu kruing balok m3 4,350,000.00
2 Kayu kruing papan m 3
4,750,000.00

Bahan - 13
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

3 Balok kayu kelas I ukuran 8/12 m1 41,760.00


4 Balok kayu kelas I ukuran 8/10 m 1
34,800.00
5 Balok kayu kelas I ukuran 6/12 m1 31,320.00
6 Balok kayu kelas I ukuran 6/10 m1 26,100.00
7 Balok kayu kelas I ukuran 6/8 m 1
20,880.00

8 Bingkai reng & kaso kayu kelas I ukuran 5/7 m1 15,225.00


9 Bingkai reng & kaso kayu kelas I ukuran 4/6 m 1
10,440.00
10 Bingkai reng & kaso kayu kelas I ukuran 3/4 m1 5,220.00
11 Bingkai reng & kaso kayu kelas I ukuran 2/3 m1 2,610.00
12 Papan kayu kelas I ukuran 2/15 m 1
14,250.00
13 Papan kayu kelas I ukuran 2/20 m1 19,000.00
14 Papan kayu kelas I ukuran 2/25 m1 23,750.00
15 Papan kayu kelas I ukuran 2/30 m 1
28,500.00
16 Papan kayu kelas I ukuran 3/18 m1 25,650.00
17 Papan kayu kelas I ukuran 3/20 m1 28,500.00
18 Papan kayu kelas I ukuran 3/25 m 1
35,625.00
19 Papan kayu kelas I ukuran 3/30 m 1
42,750.00
20 Lis Dan jalusi kayu kelas I ukuran 1/3 m1 1,305.00
21 Lis Dan jalusi kayu kelas I ukuran 1/5 m 1
2,175.00
22 Lis Dan jalusi kayu kelas I ukuran 2/4 m 1
3,480.00

LIST KAYU PROFIL


1 List kayu profil m1 5,500.00
2 Kayu plepet eternit 1/5 cm m 1
2,000.00

KAYU GLUGU, DOLKEN DAN BEGESTENG


1 Kayu glugu balok m3 1,458,000.00
2 Kayu glugu ukuran 5/7 m1 6,300.00
3 Kayu meranti m3 2,750,000.00
4 Kayu Meranti Papan m 3
2,000,000.00
5 Kayu Meranti Balok m3 1,750,000.00
6 Papan cetakan / begesteng m3 1,000,000.00
7 Kayu dolken m 3
500,000.00
8 Kayu dolken Ø 8 - 10/400 cm btg 10,000.00
9 Kayu bakar m3 90,000.00

KAYU LAPIS
1 Kayu lapis mutu I AA 3 lapis uk. 122x244x0,3 cm lbr 31,900.00
2 Kayu lapis mutu I AA 3 lapis uk. 122x244x0,4 cm lbr 41,250.00
3 Kayu lapis mutu I AA 3 lapis uk. 122x244x0,9 cm lbr 90,000.00
4 Kayu lapis mutu I AA 3 lapis uk. 122x244x1,2 cm lbr 101,750.00
5 Akustik soft board 60 x 120 lbr 125,000.00
6 Akustik soft board 40 x 60 lbr 73,000.00
7 Akustik soft board 30 x 60 lbr 55,000.00
8 Melamin wood 90 x 120 cm lbr 50,000.00
9 Melamin wood 120 x 240 cm lbr 65,000.00
10 Formika 4" x 8" x 0,3 cm lbr 65,000.00
11 Formika 120 x 240 cm lbr 89,100.00
12 Teak wood ( 90 x 240 ) lbr 69,500.00

Bahan - 14
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

13 Kayu Lapis 4 mm UK 8"x4" lbr 44,275.00

BAHAN TUMBUHAN
1 Bambu petung btg 48,500.00
2 Bambu wulung btg 9,500.00
3 Bambu apus btg 7,000.00
4 Gedek bambu kulit m2 65,000.00
5 Gedek bambu daging m2 27,000.00
6 Ijuk m 3
75,000.00
7 Ijuk kg 10,000.00
8 Alang-alang ikat 500.00

LISTRIK
1 Tusuk kontak 2 kutup tanpa pembumian/arde buah 6,500.00
2 Tusuk kontak 2 kutup dengan pembumian/arde buah 4,000.00
3 Tusuk kontak 2 kutup tanpa pembumian (timbul) buah 32,500.00
4 Tusuk kontak 2 kutup dengan pembumian (timbul) buah 6,000.00
5 Tusuk kontak 2 kutup tanpa pembumian (tanam) buah 7,500.00
6 Tusuk kontak 2 kutup dengan pembumian (tanam) buah 6,500.00
7 Kontak hubungan bagi dengan selungkup isolasi
- 1 fasa 250 V/ 6 A (timbul) buah 22,500.00
- 1 fasa 250 V/ 10 A (timbul) buah 30,000.00
- 1 fasa 250 V/ 6 A (tanam)/MCB buah 37,500.00
- 1 fasa 250 V/ 10 A (tanam)/MCB buah 37,500.00
8 Fitting duduk buah 5,000.00
9 Fitting spot duduk buah 155,000.00
10 Fitting Spot Taman buah 155,000.00
11 Fitting Sport Par 38 (1) Oog buah 125,000.00
12 Pasang instalasi / titik titik 85,000.00
13 Lampu pijar 5 watt "Phillips" buah 2,250.00
14 Lampu pijar 10 watt "Phillips" buah 3,750.00
15 Lampu pijar 25 watt/ 40 watt "Phillips" buah 4,200.00
16 Lampu pijar 60 watt / 75 watt "Phillips" buah 75,000.00
17 Lampu pijar 100 watt "Phillips" buah 5,350.00
18 Lampu softone 100 watt "Phillips" buah 6,500.00
19 Lampu pijar 150 watt "Phillips" buah 10,000.00
20 Lampu pijar 200 watt "Phillips" buah 11,500.00
21 Lampu TL 10 watt "Phillips" buah 7,000.00
22 Lampu TL 15 watt "Phillips" buah 7,500.00
23 Lampu TL 18 watt "Phillips" buah 10,500.00
24 Lampu TL 36 watt "Phillips" buah 13,000.00
25 Lampu SL 8W/9W/10W buah 75,000.00
26 Lampu SLE 11 watt "Phillips" buah 71,500.00
27 Lampu SLE 15 watt "Phillips" buah 68,500.00
28 Lampu SLE 20 watt "Phillips" buah 71,500.00
29 Lampu Slang 2 jalur (sekualitas sinyoku) roll 2,450,000.00
30 Lampu Slang 3 jalur (sekualitas sinyoku) roll 2,660,000.00
31 Lampu Rice Light 10 m pcs 75,000.00
32 Lampu Rice Light isi 100 "Phillips" pcs 59,500.00
33 Lampu Rice Light isi 140 "Phillips" pcs 71,000.00
34 Lampu Capsul isi 100 "Phillips" pcs 200,000.00
35 Lampu Capsul isi 140 "Phillips" pcs 213,200.00
36 Lampu Anggur isi 100 "Phillips" pcs 64,500.00
37 Lampu Anggur isi 140 "Phillips" pcs 75,500.00

Bahan - 15
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

38 Lampu Natal isi 50 "Phillips" pcs 23,000.00


39 Lampu Natal isi 100 "Phillips" pcs 103,500.00
40 Lampu Jenis H.PIT 400 watt "Phillips" buah 975,500.00
41 Lampu Jenis H.PIT 250 watt "Phillips" buah 700,000.00
42 Lampu PH Esensial 8 W "Philips" buah 267,902.00
43 Lampu PH Esensial 14 W "Philips" buah 28,800.00
44 Lampu PH Esensial 18 W "Philips" buah 34,750.00
45 Lampu PH Esensial 23 W "Philips" buah 40,000.00
46 Lampu PH Esensial 40 W "Philips" buah 75,000.00
47 Lampu Spot 120W 24V buah 215,000.00
48 Lampu Spot Warna-Warni buah 476,000.00
49 Lampu Sport 80W pk (m) buah 47,000.00
50 Lampu Tanggo SMF 383 1 x SON-T 150W Symmentric buah 1,940,000.00
51 Lampu Tanggo SMF 383 1 x SON-T 250W Symmentric buah 2,368,000.00
52 Lampu Tanggo SMF 383 1 x SON-T 400W Symmentric buah 2,250,000.00
53 Lampu Tirai 2 x 2 buah 480,000.00
54 Lux Meter Digital pcs 2,375,000.00
55 Rumba DVP 311 2X SONT 400 W 220 V ( Komplit ) Unit 10,797,350.00
56 Rumba DVP 311 SONT 1.000 W 220 V ( Komplit ) Unit 13,412,450.00
57 Rumba MVP 507 + MHN LA 2.000 W 380 V ( Komplit ) buah 24,675,550.00
58 Lampu CDM TT 150 W/83 buah 465,750.00
59 Munix SRX811 1x SON-T150 W Grey 220 V 50 Hz Unit 1,705,950.00
60 Munix SRX811 1x SON-T250 W Grey 220 V 50 Hz Unit 1,817,450.00
61 Munix SRX811 1x SON-T400 W Grey 220 V 50 Hz Unit 1,995,850.00
62 Munix MRX811 1x HPL-T250 W Grey 220 V 50 Hz Unit 1,705,950.00
63 Munix MRX811 1x HPL-T400 W Grey 220 V 50 Hz Unit 1,806,300.00
64 Munix HRX811 1x HPL-N250 W Grey 220 V 50 Hz Unit 1,683,650.00
65 Munix HRX811 1x HPL-N400 W Grey 220 V 50 Hz Unit 1,717,100.00
66 Tango SMF 383 1 x SON-T250 W Symmetric Unit 1,865,400.00
67 Tango SMF 383 1 x SON-T400 W Symmetric Unit 2,100,700.00
68 Tango MMF 383 1 x SON-T250 W Symmetric Unit 1,706,000.00
69 Tango MMF 383 1 x SON-T400 W Symmetric Unit 1,809,700.00
70 Tango MMF 383 1 x HPI-T 250W Symmetric Unit 1,706,000.00
71 Tango MMF 383 1 x HPI-T 400W Symmetric Unit 1,809,700.00
72 Bolam Mercury 80 watt "Phillips" buah 45,500.00
73 Bolam Mercury 125 watt "Phillips" buah 44,000.00
74 Bolam Mercury 250 watt "Phillips" buah 95,500.00
75 Bolam Mercury 400 watt "Phillips" buah 117,875.00
76 Bolam Natrium 250 watt "Phillips" buah 197,600.00
77 Bolam Natrium 400 watt "Phillips" buah 210,000.00
78 Bolam SON 250 watt buah 217,250.00
79 Bolam SON 150 watt buah 210,000.00
80 Bolam SON 70 watt buah 131,000.00
81 Bolam SON-T 250 watt buah 230,000.00
82 Bolam SON-T 150 watt buah 160,000.00
83 Bolam SON-T 70 watt buah 96,000.00
84 Lampu SON T 70W/220 V buah 111,500.00
85 Bolam Halogin 500 watt buah 37,500.00
86 Bolam Halogin 1000 watt buah 61,750.00
87 Bolam HPIT 150 watt buah 265,000.00
88 Bolam HPIT 250 watt buah 372,000.00
89 Bolam HPIT 400 watt buah 372,000.00
90 Bolam HPIT 1000 watt buah 1,130,125.00

Bahan - 16
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

91 Bolam Metal Halide 70 watt buah 145,500.00


92 Bolam Metal Halide 100 watt buah 188,548.00
93 Bolam Metal Halide 150 watt buah 148,500.00
94 Bolam Metal Halide 250 watt buah 337,000.00
95 Photo Cell 3 Ampere buah 62,750.00
96 Photo Cell 6 Ampere buah 75,000.00
97 Photo Cell 10 Ampere buah 100,000.00
98 Starter TL 20/40 watt buah 4,500.00
99 Travo TL 10 watt buah 23,500.00
100 Travo TL 20 watt buah 25,000.00
101 Travo TL 40 watt buah 29,200.00
102 Balast Mercury 80 watt buah 91,400.00
103 Balast Mercury 125 watt buah 103,500.00
104 Balast Mercury 250 watt buah 159,200.00
105 Balast Mercury 400 watt buah 187,250.00
106 Balast Natrium 250 watt buah 155,875.00
107 Balast Natrium 400 watt buah 150,000.00
108 Balast SON 250 watt buah 215,000.00
109 Balast SON 150 watt buah 165,000.00
110 Balast SON 70 watt buah 122,650.00
111 Balast Metal Halide 70 watt buah 125,750.00
112 Balast Metal Halide 100 watt buah 256,939.00
113 Balast Metal Halide 150 watt buah 176,500.00
114 Balast Metal Halide 250 watt buah 335,600.00
115 Magnetik Kontaktor SK-12 Kw 1 (SN-12) buah 200,000.00
116 Magnetik Kontaktor SK-12 Kw 2 buah 47,500.00
117 Magnetik Kontaktor SK-20 Kw 1 (SN-20) buah 279,000.00
118 Magnetik Kontaktor SK-20 Kw 2 buah 65,500.00
119 Fitting Goliath E.27 Gantung buah 19,675.00
120 Fitting Goliath E.40 Gantung buah 25,000.00
121 Fitting WD E.27 Tegak buah 4,500.00
122 Fitting WD E.40 Tegak buah 17,625.00
123 Fitting Kecil Lampu 2,5 Watt buah 325.00
124 Fitting Plastik Hitam buah 1,750.00
125 Fitting Gantung plastik gantung buah 1,000.00
126 Kap Alumunium E.27 buah 19,250.00
127 Kap Alumunium E.40 buah 21,500.00
128 Kabel Snoor 2 x 0,23 "Supreme" roll 71,200.00
129 Kabel NYA 2,5 sqmm "Supreme" roll 150,000.00
130 Kabel NYA 1,5 sqmm "Supreme" roll 95,000.00
131 Kabel NYA 2,5 sqmm "Supreme" m' 2,500.00
132 Kabel NYA 1,5 sqmm "Supreme" m' 1,600.00
133 Kabel NYM 2 x 1,5 sqmm "Supreme" m1 6,950.00
134 Kabel NYM 2 x 2,5 sqmm "Supreme" m1 10,200.00
135 Kabel NYM 2 x 4 sqmm "Supreme" m 1
15,000.00
136 Kabel NYM 3 x 1,5 sqmm "Supreme" m 1
9,025.00
137 Kabel NYM 3 x 2,5 sqmm "Supreme" m1 13,700.00
138 Kabel NYM 3 x 4 sqmm "Supreme" m 1
18,500.00
139 Kabel NYY 3 x 6 sqmm "Supreme" m 1
31,000.00
140 Kabel NYY 3 x 1,5 sqmm "Supreme" m1 13,500.00
141 Kabel NYY 3 x 2,5 sqmm "Supreme" m1 16,250.00
142 Kabel NYY 3 x 4 sqmm "Supreme" m 1
22,000.00
143 Kabel NYY 3 x 6 sqmm "Supreme" m1 31,000.00
144 Kabel NYY 4 x 6 sqmm "Supreme" m1 33,500.00

Bahan - 17
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

145 Kabel NYY 3 x 10 sqmm "Supreme" m1 43,900.00


146 Kabel NYY 4 x 10 sqmm "Supreme" m 1
58,825.00
147 Kabel NYFGBY 3 x 10 sqmm "Supreme" m1 87,000.00
148 Kabel NYFG by 3 x 4 sqmm Eterna m1 58,750.00
149 Kabel NYFG by 3 x 6 sqmm Eterna m 1
63,000.00
150 Kabel NYFG by 4 x 6 sqmm Eterna m1 66,500.00
151 Kabel NYFG by 4 x 10 sqmm m1 95,960.00

152 Kabel DX 2 x 10 sqmm "Supreme" m1 5,250.00


153 Kabel DX 2 x 16 sqmm "Supreme" m1 6,400.00
154 Kabel DX 2 x 25 sqmm "Supreme" m 1
15,750.00
155 Kabel Ties 15 cm "Supreme" m1 11,000.00
156 Kabel Tis 10 cm "Supreme" m1 6,200.00
157 Kabel Ties 20 cm m 1
15,600.00
158 Kabel Ties 25 cm m1 24,000.00
159 Kabel twisted NFA2T 2 x 16 sqmm m1 6,500.00
160 Ignitor 150 watt - 250 watt buah 57,525.00
161 Ignitor Metal Halide 70 watt buah 64,850.00
162 Ignitor Metal Halide 100 watt buah 50,000.00
163 Ignitor Metal Halide 150 watt buah 71,250.00
164 Ignitor Metal Halide 250 watt buah 125,000.00
165 Firework lamp (DC-001) 8 meter Pcs 17,192,500.00
166 Firework lamp (DC-001) 6 meter Pcs 15,323,750.00
167 NT Fuse kaki besar buah 135,000.00
168 NT Fuse kaki kecil buah 50,000.00
169 Flassther Lampu Hias Buterfly buah 2,917,687.50
170 Flassther Lampu Hias Kembang Api Besar buah 2,925,000.00
171 Flassther Lampu Hias Kembang Api Kecil buah 2,925,000.00
172 Flassther Lampu Hias Kipas buah 2,921,500.00
173 Skaklar seri OB "Broco" buah 17,500.00
174 Skaklar seri IB "Broco" buah 17,500.00
175 Skaklar engkel OB "Broco" buah 13,750.00
176 Skaklar engkel IB "Broco" buah 13,750.00
177 Stop kontak IB "Broco" buah 13,500.00
178 Stop kontak OB "Broco" buah 13,500.00
179 Kapasitor 25 F buah 50,000.00
180 Kapasitor 20 F buah 47,500.00
181 Kapasitor 12,5 uF buah 26,000.00
182 Kapasitor 8 mF buah 21,750.00
183 Kapasitor 4 mF buah 17,500.00
184 Kapasitor 70 mF metal Halide buah 40,500.00
185 Kapaso\itor 150mF metal Halide buah 53,500.00
186 Kapasitor Metal Halide 70 watt buah 62,000.00
187 Kapasitor Metal Halide 100 watt buah 115,842.00
188 Kapasitor Metal Halide 150 watt buah 69,000.00
189 Kapasitor Metal Halide 250 watt buah 151,400.00
190 MCB 25 Ampere / 16 Ampere "MG" buah 48,500.00
191 MCB 16 Ampere buah 43,000.00
192 MCB 20 Ampere buah 43,000.00
193 MCB 32 Ampere buah 56,500.00
194 MCB 35 Ampere buah 56,500.00
195 MCB 40 Ampere "MG" buah 56,500.00

Bahan - 18
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

196 MCB 63 Ampere "MG" buah 102,800.00


197 MCB 10 Ampere + box "MG" buah 43,000.00
198 MCB 6 Ampere "MG" buah 43,000.00
199 Cover MCB "MG" buah 5,000.00
200 Box Kwh Meter 25 x 35 x 20 buah 429,200.00
201 Box panel 30 x 40 x 20 buah 161,600.00
202 Box panel 20 x 11 x 9 buah 75,000.00
203 Box panel KWH meter 20 x 40 x50 buah 500,000.00
204 Box 25 x 25 x 20 buah 102,500.00
205 Box 20 x 40 x 50 buah 300,300.00
206 UZ 25 buah 6,500.00
207 UZ 63 buah 19,000.00
208 Armatur IP 65 Komplit (sekualitas SRP 822 SON 150 wa unit 3,154,300.00
209 Armatur IP 65 Komplit (sekualitas SRP 822 SON 250 wa unit 3,275,750.00
210 Armatur IP 65 Komplit (sekualitas SRP 328 SON 150 wa unit 2,702,300.00
211 Armatur IP 65 Komplit (sekualitas SRP 328 SON 250 wa unit 2,901,300.00
212 Armatur IP 65 Komplit (sekualitas SRP 810 SON 70 wat unit 2,260,300.00
213 Armatur Ekorola Komplit / TLD 18 watt unit 451,305.00
214 Armatur Simbat 40 watt unit 71,800.00
215 Armatur HPIT 100 watt (DVP 311) unit 4,021,000.00
216 Armatur Kotak Sorot (Kosong) unit 1,435,400.00
217 Armatur TO0 (Lampu Manggis) unit 1,440,600.00
218 Armatur TO1 (Lampu Manggis) unit 1,873,250.00
219 Timer Switch TB 388 buah 542,500.00
220 Timer Switch TB 38809 K buah 400,000.00
221 Timer Theben (pakai baterai) buah 725,000.00
222 Timer Heger (pakai baterai) buah 490,000.00
223 Timer Delay H3-BA (omron) buah 105,000.00
224 Timer Delay H3-CR-8 (omron) buah 170,000.00
225 Timer Digital Theben buah 985,000.00

226 Tiang Galvanit cb,1, h=9m, base plate unit 3,600,500.00


227 Tiang Galvanit cb,2, h=9m, base plate unit 3,055,500.00
228 Tiang Galvanit cb,2, h=6m, base plate unit 2,665,000.00
229 Tiang Galvanit cb,1, h=7m, base plate unit 2,650,000.00
230 Tiang Galvanit cb,1, h=6m, base plate unit 2,535,000.00
231 Tiang Galvanit cb,1, h=11m, base plate unit 4,250,000.00
232 Tiang Galvanit cb,1, h=5m, type tanam dia 2" unit 773,250.00
233 Tiang lampu Highment cb 4, h=20m, hidrolik unit 135,000.00
234 Tiang lampu Highment cb 2, h=20m, hidrolik unit 135,000.00
235 Tiang GIP cb 1. 2", 3", 4", 5", h = 9m, tanam unit 2,408,250.00
236 Tiang GIP cb 1. 2", 3", 4", h = 7m, tanam unit 2,165,000.00
237 Tiang GIP cb 1. 3", 4", 5", h = 9m, tanam unit 2,225,000.00
238 Tiang Lampu Manggis Cb. 1, t=2m btg 1,775,500.00
239 Tiang Lampu Manggis Cb. 1, t=4m btg 2,735,000.00
240 Tiang lampu Octagonal Cb 1 tinggi 9 meter btg 3,378,500.00
241 Tiang lampu Octagonal Cb 1 tinggi 11 meter btg 3,782,500.00
242 Tiang lampu Octagonal Cb 2 180° tinggi 11 meter btg 4,763,000.00
243 Tiang lampu Octagonal Cb 2 180° tinggi 11 meter btg 5,535,000.00
244 Tiang lampu Octagonal Cb 2 90° tinggi 9 meter btg 4,765,000.00
245 Tiang lampu Octagonal Cb 2 90° tinggi 11 meter btg 5,535,000.00
246 Slang Ornamenr GIP dia 1", L = 3m unit 156,680.00
247 Slang Ornamenr GIP dia 2", L = 2m unit 185,500.00
248 Slang Ornamenr GIP dia 2", L = 3m unit 205,000.00

Bahan - 19
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

249 Slang Ornamenr GIP dia 2", L = 4m unit 215,500.00


250 Slang Ornamenr GIP dia 2", L = 6m unit 300,000.00
251 Pilot Lamp buah 7,000.00
252 Seplendiel lamp (DC-002) Pcs 16,406,700.00
253 Windmill lamp (DC-003) Pcs 16,035,250.00
254 Cottonrose lamp (DC-004) Pcs 16,033,500.00
255 Lucky lamp (DC-005) Pcs 12,310,000.00
256 Fountain lamp Ball (DC-005) Pcs 14,284,000.00
257 Fountain lamp Ball (DC-006) Pcs 13,600,000.00
258 Star Flower lamp (DC-007) Pcs 15,300,000.00
259 Chritmas lamp (DC-009) Pcs 13,425,000.00
260 Butterfly lamp (DC-009) Pcs 17,450,000.00
261 No. 1 lamp (DC-010) Pcs 15,660,000.00
262 Hepta lamp (DC-011) Pcs 15,300,500.00
263 Dragon Phonix lamp (DC-013) Pcs 15,300,000.00
264 Fountain lamp (DC-014) Pcs 15,300,000.00
265 Redbud Flower lamp (DC-015) Pcs 15,850,500.00
266 Dragon Flying lamp (DC-016) Pcs 13,795,000.00
267 Floor lamp (DC-017) Pcs 10,988,000.00
268 Octopus lamp (DC-018) Pcs 10,450,000.00
269 Double Plied Fountain lamp (DC-019) Pcs 16,035,000.00
270 Flower Pot lamp (DC-020) Pcs 16,405,000.00
271 Fireworks Lamp (DC-001) 6 meter Pcs 14,561,000.00
272 Fireworks Lamp (DC-001) 8 meter Pcs 16,350,000.00
273 Octopus Lamp (DC-018) Pcs 15,290,000.00
274 Patron Sekering buah 2,050.00
275 Kop sekering buah 4,000.00
276 Isolasi besar buah 7,000.00
277 Spot + F.MP buah 72,500.00
278 Sabuk Pengaman buah 2,600,000.00
279 Tang Kombinasi buah 37,250.00
280 Tang ampere digital buah 585,500.00
281 Tang buaya buah 52,500.00
282 Tang lancip buah 27,000.00
283 Kunci Inggris buah 60,000.00
284 Kunci L buah 62,500.00
285 Kunci T 8,10,12 buah 25,000.00
286 Obeng +/- buah 25,000.00
287 Obeng Minus buah 7,250.00
288 Obeng plus buah 7,250.00
289 Obeng Tespen Biasa buah 20,000.00
290 Obeng Tespen Sinyal buah 23,200.00
291 Palu Besi Bulat 1 LB kecil buah 20,000.00
292 Palu Besi Bulat 2 11/2 LB Besar buah 25,000.00
293 Palu Besi New Zealand 11/2 LB Besar buah 20,000.00
294 Patron Sekering buah 2,000.00
295 Pengupas Kabel (Wire Stiper Sellert) buah 35,000.00
296 Photo Cell 3 Ampere buah 62,750.00
297 Photo Cell 6 Ampere buah 75,000.00
298 Photo Cell 10 Ampere buah 100,000.00
299 GZ 30 A buah 39,800.00
300 Multitester buah 116,000.00
301 Multitester analog sekualitas Sanwa buah 166,500.00
302 Multitester digital buah 455,000.00
303 Sekering buah 2,100.00

Bahan - 20
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

304 Bandet buah 4,600.00


305 Wadge Type buah 5,000.00
306 Servis link dan clem buah 5,000.00
307 Stenlist stell 20 x 0,70 roll 585,000.00
308 Stopping bukcle buah 2,000.00
309 BC 6 mm m' 4,825.00
310 Box Tool Kit buah 279,900.00
311 Genset Tipe 5000 buah 8,800,000.00
312 Gergaji Besi buah 15,100.00
313 Mata Bur Besi set 95,000.00
314 Mata Bur Beton 8m buah 21,100.00
315 Mata Bur Beton 12m buah 32,500.00
316 Meger Analog buah 1,450,000.00
317 Mesin Bor Tangan Bosch 10 GMB RZ buah 465,000.00
318 Mesin Gerinda buah 715,000.00
319 Meteran Bulat Esen 5m buah 9,500.00
320 Senter 4 batery buah 72,500.00
321 Tangga lipat t = 3 m buah 1,500,000.00
322 Tangga Sorong 2 x 4 meter buah 2,275,000.00
323 Tangga Sorong 2 x 4 meter model PLN buah 5,750,000.00
324 Tali Kabel Plister roll 37,000.00
325 Tool Kit buah 227,500.00
326 Ground Rood buah / batang 30,250.00
327 Terminal Nol buah 23,000.00
328 Mata lampu pijar 25 W -75 W buah 4,350.00
329 Stabilizer 300 A unit 2,934,000.00
330 Tutup panel 30 x 30 buah / ls 28,750.00
331 Pasang panel kontrol unit / ls 86,250.00
332 Penyambungan beban unit 17,250.00
333 Penyetelan dan penyalaan titik 7,000.00
334 Biaya angkutan jam 7,143.00
335 Alat bantu set 86,250.00
336 Retur material existing unit 100,000.00

BAHAN LOGAM BESI/BAJA TULANGAN/BESI BETON


BESI BETON
1 Besi beton polos kg 12,500.00
2 Besi beton ulir kg 11,000.00
3 Besi baja profil kg 12,500.00
4 Besi tuang / cor kg 10,750.00
5 Besi strip kg 11,500.00
6 Besi baja cor ( ring ) 150 kg unit 825,000.00
7 Besi baja cor ( ring ) 80 kg unit 440,000.00
8 Besi baja cor ( ring ) 40 kg unit 220,000.00
9 Besi penutup mahkota assainering unit 57,000.00
10 Besi penutup inlet cor/tuang ( ring + tutup) unit 85,000.00
11 Besi/plat Eizer 0,07 120 x 240 m1 190,000.00
12 Besi Plat kg 12,000.00
13 Besi Siku (L) 30.30.3 kg 9,400.00
14 Besi Siku (L) 30.30.4 kg 9,400.00
15 Besi Siku (L) 30.30.5 kg 9,400.00
16 Baja WF kg 8,800.00
17 Besi Beton Bulat kg 12,500.00
18 Besi Beton Deform C Ulir kg 12,500.00

Bahan - 21
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

KAWAT
1 Kawat beton / bindrat kg 12,100.00
2 Kawat ayakan m 2
12,700.00
3 Kawat bronjong kg 30,250.00
4 Kawat nyamuk m2 8,250.00
5 Kawat las kg 6,500.00
6 Kawat galvanis kg 7,755.00
7 Kawat anyam galvanis kg 3,607,956.00
8 Kawat duri kg 9,500.00
9 Besi jaring kawat baja kg 9,500.00
10 Kawat seng polos kg 9,500.00
11 Kawat kassa m2 10,000.00
12 Kawat burung m 2
15,000.00
13 Kawat jaring lbr 35,000.00
14 Kawat harmonika m2 25,000.00
15 Kawat penggantung rangka hollow m1 500.00
16 Profil Alumunium "T" m1 20,000.00
17 Ramset / dina bolt bh 2,500.00
18 Pipa galvanis dia. 1/2" m1 18,000.00
19 Pipa galvanis dia. 3/4" m 1
24,000.00
20 Pipa galvanis dia. 1" m1 36,500.00
21 Pipa galvanis dia. 1 1/2" m1 70,000.00
22 Pipa galvanis dia. 3" tebal 3,2 mm m 1
92,320.00
23 Pipa galvanis dia. 4" tebal 3,2 mm m 1
124,160.00
24 Pipa galvanis dia. 5" tebal 4 mm m1 214,400.00
25 Pipa galvanis dia. 2" tebal 3,2 mm m 1
57,280.00
26 Pipa galvanis dia. 2,5" tebal 3,2 mm m 1
72,320.00
27 Pipa galvanis dia. 1 1/4" tebal 3,2 mm m1 35,000.00
28 Pipa hollow 4 x 4 cm tebal 1.2 mm m1 9,500.00
29 Kusen alumunium uk 2"x4" tebal 1.5 mm sekualitas YK m 1
120,000.00
30 Jendela nako bh 20,000.00
31 Pintu besi baja m2 750,000.00
32 Jendela besi baja m2 750,000.00
33 Jendela besi tahan api m2 1,500,000.00
34 Pintu gulung besi m 2
250,000.00
35 Pintu lipat besi m2 500,000.00
36 Sunscreen alumunium m2 250,000.00
37 Roll door m 2
200,000.00
38 Pintu alumunium m2 400,000.00
39 Vertikal blind m2 250,000.00
40 Wall paper m 2
40,000.00

SENG BJLS
1 Seng BJLS 0,20 gelombang P = 180 cm lbr 38,500.00
2 Seng BJLS 0,20 gelombang P = 200 cm (merk Fumira) lbr 42,000.00
3 Seng BJLS 0,20 gelombang P = 240 cm lbr 60,000.00
4 Seng BJLS 0,20 gelombang P = 300 cm lbr 70,000.00
5 Seng BJLS 0,28 lembaran 40 cm lebar m1 12,500.00

Bahan - 22
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

6 Seng BJLS 0,28 lembaran 50 cm lebar m1 16,000.00


7 Seng BJLS 0,20 lembaran 90 cm lebar m 1
25,000.00
8 Seng BJLS 0,30 lembaran 40 cm lebar m1 20,000.00
9 Seng BJLS 0,30 lembaran 50 cm lebar m1 18,000.00
10 Seng BJLS 0,30 lembaran 60 cm lebar m 1
20,000.00
11 Seng BJLS 0,30 lembaran 90 cm lebar m1 28,000.00
12 Seng plat 3" x 6" BJLS 28 lbr 44,000.00
13 Seng plat 3" x 6" BJLS 24 lbr 38,500.00
14 Seng gelombang 2" - 5" BJLS 24 lbr 25,000.00
15 Alumunium gelombang tebal 0,55 m2 45,000.00
16 Alumunium foil m 2
25,000.00
17 Nok alumunium standar 40 cm 18 SWG 22 m1 25,000.00
18 Seng BJLS 0.20 gelombang P = 100 cm lbr 36,000.00
19 Seng BJLS 0.20 gelombang P = 210 cm lbr 42,500.00
20 Seng BJLS 0.20 gelombang P = 300 cm lbr 70,000.00
21 Seng BJLS 0.20 gelombang P = 240 cm lbr 60,000.00
22 Seng BJLS 0.28 lembaran 50 cm lebar m' 25,000.00
23 Seng BJLS 0.28 lembaran 90 cm lebar m' 30,000.00
24 Seng BJLS 0.28 lembaran 40 cm lebar m' 16,000.00
25 Seng BJLS 0.30 lembaran 40 cm lebar m' 15,500.00
26 Seng BJLS 0.30 lembaran 50 cm lebar m' 55,000.00

PAKU
1 Paku gording 125 x 5,1 mm kg 8,000.00
2 Paku gording 100 x 4,2 mm kg 8,000.00
3 Paku usuk 80 x 3,8 mm kg 9,000.00
4 Paku reng 55 x 3,1 mm kg 9,000.00
5 Paku plepet 40 x 2,1 mm kg 11,000.00
6 Paku eternit 20 x 1,5 mm kg 14,000.00
7 Angkur / baut bh 10,000.00
8 Baut Baja kg 11,700.00
9 Paku besar, sedang kg 12,500.00
10 Paku Payung kg 20,300.00
11 Paku Beton 5 cm bh 350.00
12 Paku kait bh 8,500.00
13 Paku pancing bh 500.00
14 Paku pancing kg 9,350.00
15 Paku asbes bh 400.00
16 Paku sumbat bh 400.00
17 Paku sekrup 3.5" bh 750.00
18 Paku skrup kg 10,000.00
19 Paku gypsum kg 20,000.00
20 Paku hak panjang 15 cm kg 9,500.00

PENGGANTUNG / PENGUNCI
1 Engsel pintu bh 11,000.00
2 Engsel jendela bh 7,500.00
3 Grendel bh 2,500.00
4 Hak angin bh 5,500.00
5 Selot pintu Union kecil bh 37,500.00
6 Selot pintu Union besar bh 47,500.00
7 Engsel angin bh 3,000.00
8 Kait angin bh 3,000.00
9 Door holder bh 15,000.00

Bahan - 23
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

10 Door stop bh 15,000.00


11 Penggantung + rel pintu dorong bh 200,000.00
12 Kunci tanam bh 35,000.00
13 Kunci tanam antik bh 250,000.00
14 Kunci tanam biasa bh 125,000.00
15 Kunci Tanam Besar bh 159,500.00
16 Kunci Tanam Kecil bh 110,000.00
17 Kunci Pintu Air bh 500,000.00
15 Kunci kamar mandi bh 50,000.00
16 Kunci selot bh 50,000.00
17 Kunci silinder bh 75,000.00
18 Kunci lemari bh 12,000.00
19 Spring knip bh 7,500.00
20 Door closer bh 150,000.00

ASPAL
1 Aspal curah kg 9,500.00
2 Aspal drum kg 10,650.00
3 Aspal modifer / asphalt joint kg 60,000.00
4 Drum aspal bekas bh 8,250.00
5 Rubber Filler m1 9,000.00
6 Mata Kucing bh 215,000.00
7 Filler kg 750.00
8 Aspal Emulsi Type CRS-2 kg 6,300.00
9 Aspal Emulsi Type CRS-1 kg 6,300.00
10 Aspal Emulsi Type CRS-1 Polymer kg 7,200.00
11 Aspal Panas kg 5,900.00

BATU ALAM / AGREGAT / BAHAN TUMBUHAN


BATU ALAM
1 Batu kali m3 130,000.00
2 Batu hias tempel m 2
75,000.00
3 Batu hias bulat putih m 3
147,500.00
4 Ubin marmer ( 40 x 40 x 2 ) Batik/Citatah m2 100,000.00
5 Ubin marmer ( 40 x 60 x 2 ) Batik m 2
450,000.00
6 Ubin marmer ( 15 x 30 x 2 ) Batik m 2
150,000.00

AGREGAT
1 Agregat hakus/pasir klas A ( Uk. butir 5 mm ) m3 79,750.00
2 Agregat kasar/krikil/pasir klas B ( Uk. 20 - 40 ) m 3
126,500.00
3 Agregat kasar/krikil/pasir klas B ( Uk. 4½ - 19 ) m3 132,000.00
4 Batu pecah 2/3 ( split ) m 3
145,000.00
5 Batu Split 1/2 m 3
172,200.00
6 Batu Jagung 0,5/1,00 m3 137,700.00
7 Batu pecah 2/3 m3 151,500.00
8 Batu pecah 10/15 m 3
88,837.50
9 Batu pecah 3/4 m3 130,000.00
10 Batu pecah 4/6 m3 126,500.00
11 Batu pecah 5/7 m 3
132,000.00
12 Batu pecah 1/2 m3 225,000.00
13 Batu belah 15/20 m3 107,250.00

Bahan - 24
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

14 Batu belah hitam m3 107,250.00


15 Batu belah putih m 3
107,250.00
16 Sirtu Klas A lewat ayakan 1" m3 66,000.00
17 Sirtu klas B lewat ayakan 2½" m3 66,000.00
18 Pasir urug darat m 3
75,000.00
19 Pasir pasang ( progo ) m3 120,000.00
20 Pasir pasang ( krasak ) m3 145,000.00
21 Krikil beton biasa m 3
78,650.00
22 Kerikil beton pecah m 3
200,000.00
23 Kerikil tidak tersaring m3 90,000.00
24 Split D 30 - 40 mm m 3
200,000.00
25 Split D 10 - 20 mm m 3
200,000.00
26 Split D 1 - 2 cm m3 225,000.00
27 Batu merah ( 5x11x23 ) bj 500.00
28 Batu merah ( 4x9x19 ) bj 300.00
29 Krokos 0,2/0,4 m3 90,000.00
30 Tanah urug m3 45,000.00
31 Sirtu m 3
90,000.00
32 Batako bh 1,500.00
33 Roster 25/25 bh 2,000.00

BAHAN PEREKAT HIDROLIS & ORGANIK


1 Portland Cement (PC) Gresik 50 kg 51,250.00
40 kg 41,000.00
2 Portland Cement (PC) Nusantara 50 kg 59,800.00
40 kg 41,000.00
3 Portland Cement (PC) Tiga Roda 40 kg 41,000.00
4 Semen putih kg 2,200.00
5 Semen warna kg 7,000.00
6 Semen merah m3 75,000.00
7 Lem kayu (putih) Fox kg 11,000.00
8 Lem plastik Acrylic kg 60,000.00
9 Lem plastik Vinyl kg 19,500.00
10 Lem Aica Aibon kg 27,500.00

KAPUR & GIPS


1 Kapur pasang m3 72,500.00
2 Kapur pasang sak 8,000.00
3 Kapur sirih m3 138,000.00
4 Kapur sirih kg 500.00
5 Semen batu bata m3 80,000.00
6 Tepung Gypsum kg 3,500.00
7 Alkasit kg 300,000.00
8 Gypsum board lbr 55,000.00
9 Kasa gypsum roll 10,000.00
10 List profil gypsum lebar sampai 5 cm m1 4,000.00
11 List profil gypsum lebar sampai 6 - 10 cm m1 8,000.00
12 List profil gypsum lebar lebih 10 cm m 1
15,000.00
13 Kalsiboard ( 122 x 244 x 0,35 ) cm lbr 46,200.00
14 Kalsiboard ( 122 x 244 x 0,60 ) cm lbr 60,500.00

Bahan - 25
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

BAHAN PELARUT, PELUMAS


1 Oli SAE 30 ltr 21,000.00
2 Minyak bakar / kerosene ltr 1,000.00
3 Bensin premium ltr 4,500.00
4 Solar ltr 4,500.00
5 Minyak pelumas ltr 14,000.00
6 Vet kg 13,000.00
7 Gas Elpiji kg 7,000.00
8 Minyak bekisting ltr 5,000.00

BAHAN KIMIA PEMBANTU UNTUK BETON


1 Bahan kimia B (kuat ikat cepat ) kg 35,000.00
2 Bahan kimia E (kuat ikat cepat ) kg 30,000.00

BAHAN PENGAWET DANBITUMEN


1 Teer kayu box 8,000.00
2 Residu ltr 3,500.00
3 Flincoat ltr 35,000.00

BAHAN KACA
1 Genteng kaca lengkung cekung 3 mm bh 5,500.00
2 Genteng kaca lengkung cekung 5 mm bh 7,000.00
3 Genteng kaca lengkung rata 3 mm bh 5,500.00
4 Genteng kaca lengkung rata 5 mm bh 6,850.00
5 Genteng kaca 3 mm bh 4,000.00
6 Genteng kaca 5 mm bh 6,850.00
7 Kaca buram/kaca es 3 mm m2 55,000.00
8 Kaca buram/kaca es 5 mm m2 80,000.00
9 Genteng Kaca Paris bh 1,900.00
10 Genteng Kaca Kodok bh 5,500.00
11 Genteng Kaca Beton bh 33,000.00

12 Kaca bening 3 mm m2 50,000.00


13 Kaca bening 5 mm m 2
65,000.00
14 Kaca riben 3 mm m2 60,000.00
15 Kaca riben 5 mm m 2
80,000.00
16 Kaca cermin 3 mm m 2
75,000.00
17 Kaca cermin 5 mm m2 120,000.00
18 Kaca cermin 3 mm m2 80,000.00
19 Kaca patri m 2
300,000.00
20 Fiber glass lbr 28,000.00

BAHAN PLASTIK
1 Pipa PVC abu-abu dia. 1/2" Wavin btg 12,650.00
2 Pipa PVC abu-abu dia. 3/4" Wavin btg 17,000.00
3 Pipa PVC abu-abu dia. 1" Wavin btg 20,500.00
4 Pipa PVC abu-abu dia. 1 1/2" Wavin btg 45,000.00
5 Pipa PVC abu-abu dia. 2" Wavin btg 60,000.00
6 Pipa PVC abu-abu dia. 2 1/2" Wavin btg 82,000.00
7 Pipa PVC abu-abu dia. 3" Wavin btg 82,000.00
8 Pipa PVC abu-abu dia. 4" Wavin btg 135,000.00
9 Pipa PVC putih dia. 1/2" Wavin btg 12,000.00
10 Pipa PVC putih dia. 3/4" Wavin btg 15,000.00
11 Pipa PVC putih dia. 1" Wavin btg 21,000.00

Bahan - 26
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

12 Pipa PVC putih medium dia. 3" Wavin btg 48,000.00


13 Pipa PVC putih tebal dia. 3" Wavin btg 80,000.00
14 Pipa PVC putih medium dia. 4" Wavin btg 135,000.00
15 Pipa PVC putih tebal dia. 4" Wavin btg 157,000.00
16 Atap plastik gelombang PVC (180 X 80) lbr 67,500.00

TANAMAN HIAS / PERINDANG


TANAMAN PERINDANG
1 Angsana, tinggi +/- 2m dia 5 cm batang 75,000.00
2 Angsana, tinggi +/- 2m dia 3 cm batang 30,000.00
3 Angsana, tinggi +/- 3m dia 5 cm batang 80,000.00
4 Asem jawa, tinggi +/- 1,5 m dia 2 cm batang 25,000.00
5 Bauhmis (Orchid tree), tinggi +/- 2 m dia 2 cm batang 20,000.00
6 Beringin, tinggi +/- 1 m dia 2 cm putih batang 50,000.00
7 Beringin, tinggi +/- 2 m dia 3 cm putih batang 125,000.00
8 Biola cantik, tinggi +/- 3 m dia 5 cm batang 300,000.00
9 Biola cantik, tinggi +/- 2 m dia 4 cm batang 125,000.00
10 Biola cantik, tinggi +/- 1,5 m ia 3 cm batang 75,000.00
11 Filisium, tinggi +/- 1,5 m dia 2 cm batang 25,000.00
12 Gayam, tinggi +/- 1,5 m dia 2 cm batang 25,000.00
13 Gidogan Biasa, tinggi +/- 1 m dia 1,5 cm batang 25,000.00
14 Gidogan Biasa, tinggi +/- 2,5 m dia 3 cm batang 35,000.00
15 Glodokan Pecut tinggi 2m batang 40,000.00
16 Kenari, tinggi +/- 1,5 m dia 2 cm batang 20,000.00
17 Kepel, tinggi +/- 1,5 m dia 3 cm batang 45,000.00
18 Ketepang, tinggi +/- 1,5 m dia 2 cm batang 25,000.00
19 Mahoni, tinggi +/- 1,5 m dia 2 cm batang 25,000.00
20 Sawo Kecik, tinggi +/- 1,5 m dia 2 cm batang 45,000.00
21 Sentul, tinggi +/- 1,5 m dia 2 cm batang 25,000.00
22 Tanjung, tinggi +/- 1 m dia 2 cm batang 30,000.00
23 Tanjung, tinggi +/- 3 m dia 3 cm batang 75,000.00
24 Beringin , tinggi +/- 2-3 m batang 150,000.00
25 Beringin, tinggi +/- 3 m dia 4 cm batang 300,000.00

TANAMAN HIAS
RUMPUT
1 Rumput Gajah (tanam) m2 12,000.00
2 Rumput Gajah (gebalan) m 2
15,000.00
3 Rumput gajah Mini tanam m2 40,000.00
4 Rumput Manila (gebalan) m2 12,000.00
5 Rumput golf m 2
11,000.00
6 Rumput gebalan m 2
5,000.00

PERDU
1 Bambu Air tinggi 1,5 m rumpun 25,000.00
2 Batavia/Jatropa tinggi 0,5 m batang 35,000.00
3 Batavia/Jatropa tinggi 1,5 m batang 130,000.00
4 Bougenville, tinggi +/- 0, 5 m batang 40,000.00
5 Bougenville, tinggi +/- 0, 7 m batang 70,000.00
6 Bougenville, tinggi +/- 1, 0 m batang 100,000.00
7 Bougenville varigata, tinggi +/- 0, 8 m batang 150,000.00
8 Classia planisicua, tinggi +/- 0,5 m batang 20,000.00
9 Cordata tinggi 0,4 m rumpun 25,000.00
10 Kembang Sepatu (Bangkok), tinggi +/- 0,2 m batang 10,000.00

Bahan - 27
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

11 Kembang Sepatu (lokal), tinggi +/- 0,4 m batang 5,000.00


12 Mawar, tinggi +/- 0,25 m batang 7,500.00
13 Melati air tinggi 0,4m rumpun 25,000.00
14 Palem botol, tinggi +/- 0,8 m kecil 15 cm rumpun 150,000.00
15 Palem kuning, tinggi +/- 0,6 m rumpun 12,500.00
16 Palem kuning, tinggi +/- 1 m rumpun 20,000.00
17 Palem kuning, tinggi +/- 1,5 - 2 m rumpun 125,000.00
18 Palem kuning, tinggi +/- 2 - 3 m rumpun 175,000.00
19 Palem merah, tinggi +/- 2 - 3 m rumpun 150,000.00
20 Palem wregu, tinggi +/- 0,6 m rumpun 25,000.00
21 Palem putri, tinggi +/- 1 m rumpun 75,000.00
22 Palem putri, tinggi +/- 2 m rumpun 150,000.00
23 Papyrus tinggi 0,7 m rumpun 25,000.00
24 Parikesit tinggi 0,7 m rumpun 25,000.00
25 Soka pagar, 0,3 m batang 7,500.00
26 Serut, tinggi +/- 1 - 1,5 m batang 450,000.00
27 Puring bangkok, tinggi +/- 0,6 m batang 12,500.00
28 Phonik, tinggi +/- 1 m batang 150,000.00
29 Batavia / Jatropa, tinggi +/- 0,5 m batang 15,000.00
30 Serut, tinggi +/- 1,5 m batang 700,000.00

POHON
1 Cemara kipas, tinggi +/- 0,5 m batang 20,000.00
2 Cemara kipas, tinggi +/- 1,5 m batang 75,000.00
3 Cemara lilin, tinggi +/- 1,5 m batang 40,000.00
4 Cemara rantes, tinggi +/- 1 m batang 40,000.00
5 Cemara udang, tinggi +/- 1 - 1,5 m batang 600,000.00
6 Cemara norvox, tinggi +/- 0,6 m batang 50,000.00
7 Cemara norvox, tinggi +/- 1,5 m batang 80,000.00
8 Cempokok mulyo, tinggi +/- 0,5 m batang 15,000.00
9 Cempokok mulyo, tinggi +/- 1 m batang 40,000.00
10 Ceplok Piring, tinggi +/- 0,5 m batang 7,500.00
11 Ceplok Piring, tinggi +/- 1 m batang 20,000.00
12 Glodogan Pecut, tinggi +/- 1 m batang 14,000.00
13 Glodogan Pecut, tinggi +/- 2 m batang 40,000.00
14 Kelapa gading, tinggi +/- 3 m batang 200,000.00
15 Nusa indah, tinggi +/- 0,5 m batang 10,000.00
16 Nusa indah, tinggi +/- 1 m batang 30,000.00
17 Palem ekor tupai, tinggi +/- 1 m batang 75,000.00
18 Palem ekor tupai, tinggi +/- 2 m batang 150,000.00
19 Palem jepang, tinggi +/- 1 m rumpun 50,000.00
20 Palem jepang, tinggi +/- 2 m rumpun 100,000.00
21 Palem raja, tinggi +/- 4 m batang 150,000.00
22 Palem raja, tinggi +/- 6 m batang 250,000.00
23 Palem raja, tinggi +/- 7 m batang 1,500,000.00

SEMAK
1 Alamanda, tinggi +/- 0,2 m rumpun 5,000.00
2 Canna holland, tinggi +/- 0,3 m rumpun 15,000.00
3 Canna lokal, tinggi +/- 0,5 m rumpun 7,500.00
4 Cendrawasih, tinggi +/- 0,2 m batang 5,000.00
5 Cantik manis, tinggi +/- 0,2 m batang 3,000.00
6 Dieffenbachia, tinggi +/- 0,2 m batang 10,000.00
7 Dieffenbachia, tinggi +/- 0,5 m batang 20,000.00
8 Hanjuang, tinggi +/- 0,3 m batang 3,000.00

Bahan - 28
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

9 Helogenia, tinggi +/- 0,4 m rumpun 4,000.00


10 Kayu besi, tinggi +/- 0,5 m batang 7,500.00
11 Kayu besi, tinggi +/- 0,5 m rumpun 3,500.00

12 Kuping gajah, tinggi +/- 0,3 m rumpun 7,500.00


13 Ficus Repens batang 7,500.00
14 Lantana, tinggi +/- 0,2 m rumpun 4,000.00
15 Lantana, tinggi +/- 0,3 m rumpun 5,000.00
16 Yuliana rumpun 5,000.00
17 Iler rumpun 5,000.00
18 Yuca, tinggi +/- 0,4 m batang 30,000.00
19 Yuca, tinggi +/- 0,75 m batang 70,000.00
20 Melati, tinggi +/- 0,2 m batang 10,000.00
21 Phylodendron, tinggi +/- 0,4 m rumpun 7,500.00
22 Phylodendron, tinggi +/- 0,7 m rumpun 15,000.00
23 Sansiviera rumpun 7,500.00
24 Sirig gading, tinggi +/- 0,3 m rumpun 4,000.00
25 Soka bangkok, tinggi +/- 0,2 m batang 7,500.00
26 Soka jepang, tinggi +/- 0,2 m batang 5,000.00
27 Stevanut, tinggi +/- 0,3 m batang 15,000.00
28 Stivera batang 30,000.00
29 Taiwan beauty, tinggi +/- 0,2 m rumpun 4,000.00
30 Teh-tehan hijau bulat, tinggi +/- 0,3 m batang 10,000.00
31 Teh-tehan hijau bulat, tinggi +/- 0,5 m batang 25,000.00
32 Teh-tehan hijau bulat (pagar), tinggi +/- 0,4 m batang 5,000.00
33 Teh-tehan hijau bulat (pagar), tinggi +/- 0,3 m batang 2,500.00
34 Teh-tehan kuning, tinggi +/- 0,2 m batang 500.00
35 Teh-tehan kuning bulat, tinggi +/- 0,3 m batang 5,000.00
36 Tela-Tela tinggi 0,2 m rumpun 4,000.00
37 Tri colour, tinggi +/- 0,3 m batang 7,500.00
38 Tri colour, tinggi +/- 0,2 m batang 12,500.00
39 Dracaena, tinggi +/- 0,8 m rumpun 3,500.00
40 Bambu pangkas, tinggi +/- 0,2 m batang 12,500.00
41 Patah tulang, tinggi +/- 0,3 m rumpun 4,000.00
42 Kuncira, tinggi +/- 0,3 m rumpun 3,000.00
43 Varent, tinggi +/- 0,3 m rumpun 4,000.00
44 Anthurium tinggi +/- 0,3 m rumpun 25,000.00
45 Bakung tinggi +/- 0,3 m rumpun 4,000.00
46 Nanas merah tinggi +/- 0,2 m rumpun 30,000.00
47 Nanas kuning tinggi +/- 0,2 m rumpun 15,000.00
48 Krisdoren tinggi +/- 0,2 m rumpun 20,000.00

TANAMAN PENUTUP TANAH


1 Adam eva kecil tinggi +/- 0,1 m rumpun 1,500.00
2 Adam eva besar tinggi +/- 0,2 m rumpun 4,000.00
3 Agave, tinggi +/- 0,4 m rumpun 50,000.00
4 Agave, tinggi +/- 0,2 m rumpun 25,000.00
5 Andong, tinggi +/- 0,3 m batang 2,500.00
6 Andong, tinggi +/- 0,2 m batang 2,000.00
7 Aponika, tinggi +/- 0,2 m rumpun 500.00
8 Kacang-kacangan tinggi 0,2 m rumpun 4,000.00
9 Portulaka rendah/pendek rumpun 2,000.00
10 Portulaka bangkok rumpun 4,000.00
11 Lili paris tinggi 0,2 m rumpun 2,000.00

Bahan - 29
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

12 Lili paris/rikmo putri pot kecil 1,000.00


13 Mega mendung, tinggi +/- 0,3 m batang 7,500.00
14 Modogras, tinggi +/- 0,2 m rumpun 800.00
15 Suplier, tinggi +/- 0,4 m rumpun 20,000.00
16 Singonium rumpun 3,000.00
17 Terang bulan, tinggi +/- 0,4 m rumpun 10,000.00
18 Lili paris brasil tinggi +/- 0,3 m rumpun 4,500.00
19 Pupuk kandang kg 500.00
20 Tanah untuk media tanam m3 75,000.00

PELENGKAP TAMAN
1 Kerb Taman tinggi 50 cm terpasang m 75,000.00
2 Pengecatan Kerb Taman terpasang m² 17,500.00
3 Para/ Jala m 15,000.00
4 Polybag kg 15,000.00
5 Pot tanah buah 7,500.00
6 Pot Hias buah 50,000.00

PERALATAN KEBERSIHAN
1 Sapu lidi bh 3,000.00
2 Tangkai Sapu bh 5,000.00
3 Tomblok bh 3,500.00
4 Hareg bh 3,000.00
5 Kerug bh 5,000.00
6 Seragam bh 75,000.00
7 Sarung tangan bh 7,500.00
8 Masker bh 7,500.00
9 Gerobak (alat baru) bh 1,500,000.00
10 Gerobak (sewa) bh 1,500.00
11 Serok bh 5,000.00
12 Gunting pangkas bh 35,000.00
13 Mesin potong rumput bh 3,000,000.00
14 Gathul bh 10,000.00
15 Garpu tanah bh 15,000.00
16 Arit bh 20,000.00
17 Gerobak celeng bh 400,000.00
18 Sepatu ps 75,000.00
19 Ember bh 5,000.00
20 Bagor bh 600.00
21 Irus bh 10,000.00
22 Cetok bh 10,000.00
23 Linggis bh 35,000.00
24 Martil bh 10,000.00
25 Betel bh 17,500.00
26 Betel Mokuba bh 46,800.00
27 Pacul bh 30,000.00
28 Sewa kendaraan untuk membuang lumpur hr 118,000.00
29 Gas oksigen 5 kg tb 15,000.00
30 Nipel bh 10,000.00
31 Pipa dia. 3/8" - 15 cm bh 1,500.00
32 Nitobond EC kg 100,000.00
33 Conbextra EP kg 200,000.00
34 Cebex 100 kg 150,000.00
35 Sewa Compressor untuk pekerjaan grouting hr 250,000.00

Bahan - 30
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

36 Sewa Mesin Grouting hr 150,000.00


37 Sewa mesin gerinda untuk pekerjaan grouting hr 100,000.00
38 Sewa mixer ubtuk pekerjaan grouting hr 6,000.00
39 Alat bantu pekerjaan grouting ls 5,000.00
40 Alat bantu pekerjaan pekerjaan marka ls 130,000.00
41 Alat bantu pekerjaan pekerjaan expantion joint ls 130,000.00

42 Pelapisan kedap air lantai dengan coating ( terpasang m2 40,000.00


43 Pelapisan kedap air lantai dengan membran ( terpasa m2 60,000.00

LAIN-LAIN

1 Tiang bendera
-Pondasi umpak buah 31,000.00
-Ompak ornamen buah 65,800.00
-Tiang galvanis 3" m' 23,375.00
-Bendera 120 x 180 buah 39,825.00
2 Rambu lalu lintas (terpasang) buah 150,000.00
3 Papan nama jalan (terpasang) buah 250,000.00
4 Sumur peresapan 5 m buah 495,000.00
5 m1 17,250.00
Air minum, instalasi dalam dengan pipa pralon 1"
medium, acesories dihitung sendiri
6 m1 16,500.00
Air minum, instalasi luar dengan pipa pralon 1"
medium, acesoris dihitung sendiri
7 Minyak Flux liter 12,000.00
8 Asbuton kg 2,350.00
9 Tumpuan konstruksi m 66,700.00
10 Kerikil sungai - royalty m3 5,750.00
11 Batu gunung - royalty m3 5,750.00
12 Uji test besi ( 3 sampel tiap jenis diameter benda uji set 150,000.00
13 Uji test aspal ttk 100,000.00
14 Sewa alat sondir hr 100,000.00
15 Sewa Scaffolding unit 20,000.00
16 Benda uji silinder beton bh 3,000.00
17 Biaya tes beton per benda uji bh 5,000.00
18 Biaya analisis tes beton perbeda uji bh 15,000.00
19 Bambu batangan (apus) batang 4,600.00
20 Filler kg 750.00
21 Tutup panel 30 x 30 bh 28,750.00
22 MCB 10 Ampere + box bh 74,750.00
23 Kapasitor 12,5 uF bh 35,200.00
24 Pipa pralon 3" batang 94,300.00
25 Penyambungan beban ls 17,250.00
26 Pasang panel kontrol ls 86,250.00
27 Alat bantu ls 86,250.00
28 Vet kg 13,000.00

Bahan - 31
K 350 - 400

K250-300

Bahan - 32
unit

Bahan - 33
duduk
duduk

Bahan - 34
11,700,000.00

20.00

Bahan - 35
58,500,000.00

Bahan - 36
42,222.22

Bahan - 37
62,500.00 42500

/40 KG

Bahan - 38
ANALISA SATUAN PEKERJAAN
No. Macam Pekerjaan Upah
(1) (2) (3)

PEKERJAAN PERSIAPAN
AK 100.00 m2 Pekerjaan Pengukuran Gedung
8.0000 org Pekerja @ Rp. 35,000.00 280,000.00
2.0000 org Mandor @ Rp. 47,500.00 95,000.00
0.5000 org Pengawas @ Rp. 50,000.00 25,000.00
2.0000 org Asisten Ahli Ukur @ Rp. 87,200.00 174,400.00
1.0000 hr Sewa alat ukur @ Rp. 200,000.00 200,000.00
JUMLAH ( BELUM PPN ) 774,400.00
JASA 10 %
JUMLAH
DIBULATKAN

1.0000 m2 Pekerjaan Pengukuran


0.01 x 851,840.00 8,518.40

SNI 1.0000 m1 Pengukuran dan pemasangan bouwplank untuk gedung dan saluran
6.4 0.0120 m3 Kayu meranti 5/7 @ Rp. 2,750,000.00
03-2835-2002 0.0200 kg Paku reng @ Rp. 9,000.00
0.0070 m3 Kayu meranti papan 3/20 @ Rp. 2,750,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kepala tukang kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0050 org Mandor @ Rp. 47,500.00 237.50
JUMLAH ( BELUM PPN ) 8,987.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Membersihkan lapangan dan perataan


6.8 0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
03-2835-2002 0.0500 org Mandor @ Rp. 47,500.00 2,375.00
JUMLAH ( BELUM PPN ) 5,875.00
JASA 10 %
JUMLAH
DIBULATKAN

A4 1.0000 bh Membuat Papan Nama Proyek 80x120 cm


0.0350 m3 Kayu meranti @ Rp. 2,750,000.00
1.4000 m1 Seng plat lebar 90 cm @ Rp. 25,000.00
0.6000 kg Paku @ Rp. 11,000.00
1.5000 kg Cat kayu @ Rp. 39,000.00
16.8000 kg PC @ Rp. 1,196.00
0.0270 m3 Pasir beton @ Rp. 120,000.00
0.0405 m3 Kerikil beton @ Rp. 78,650.00
0.0175 org Tukang batu @ Rp. 45,000.00 787.50
1.0000 org Tukang kayu @ Rp. 47,500.00 47,500.00
1.0000 org Tukang cat @ Rp. 42,500.00 42,500.00

Analisa Gedung - 39
No. Macam Pekerjaan Upah
(1) (2) (3)
2.1000 org Pekerja @ Rp. 35,000.00 73,500.00
1.0050 org Mandor @ Rp. 47,500.00 47,737.50
JUMLAH ( BELUM PPN ) 212,025.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pembuatan jalan sementara, tebal 25 cm


6.16 0.2750 m3 Batu belah @ Rp. 107,250.00
0.0300 m3 Kerikil @ Rp. 78,650.00
0.0500 m3 Pasir @ Rp. 145,000.00
1.0000 org Pekerja @ Rp. 35,000.00 35,000.00
0.1000 org Mandor @ Rp. 47,500.00 4,750.00
JUMLAH ( BELUM PPN ) 39,750.00
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 40
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m2 Pembuatan kantor sementara, dengan lantai plesteran


6.5 1.2500 btg Dolken kayu Ø 8 - 10/400 cm @ Rp. 10,000.00
03-2835-2002 0.1800 m3 Kayu meranti @ Rp. 2,750,000.00
0.8500 kg Paku biasa @ Rp. 8,000.00
1.1000 kg Baja strip @ Rp. 11,500.00
35.0000 kg PC @ Rp. 1,196.00
0.1500 m3 Pasir pasang @ Rp. 145,000.00
0.1000 m3 Pasir beton @ Rp. 120,000.00
0.1500 m 3
Kerikil beton @ Rp. 78,650.00
30.0000 bh Bata merah @ Rp. 500.00
0.2500 lbr Seng plat 3" x 6 " @ Rp. 38,500.00
2.0000 bh Jendela nako @ Rp. 20,000.00
0.0800 m2 Kaca polos @ Rp. 65,000.00
0.1500 bh Kunci tanam @ Rp. 35,000.00
0.0600 lbr Plywood 4 mm @ Rp. 41,250.00
2.0000 org Tukang kayu @ Rp. 47,500.00 95,000.00
1.0000 org Tukang batu @ Rp. 45,000.00 45,000.00
0.3000 org Kepala tukang @ Rp. 50,000.00 15,000.00
2.0000 org Pekerja @ Rp. 35,000.00 70,000.00
0.0500 org Mandor @ Rp. 47,500.00 2,375.00
JUMLAH ( BELUM PPN ) 227,375.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m1 Pembuatan pagar sementara dari seng gelombang tinggi 2 meter
6.2 1.2500 btg Dolken kayu Ø 8 - 10/400 cm @ Rp. 10,000.00
03-2835-2002 2.5000 kg PC @ Rp. 1,196.00
1.2000 lbr Seng gelombang 2"-5" BJLS 24 @ Rp. 25,000.00
0.0050 m3 Pasir beton @ Rp. 120,000.00
0.0090 m3 Kerikil beton @ Rp. 78,650.00
0.0250 m3 Kaso 5/7 kayu meranti @ Rp. 2,750,000.00
0.0600 kg Paku biasa 2" - 5" @ Rp. 8,000.00
0.4000 kg Meni besi @ Rp. 13,000.00
0.2000 org Tukang kayu @ Rp. 47,500.00 9,500.00
0.0200 org Kepala tukang kayu @ Rp. 50,000.00 1,000.00
0.4000 org Pekerja @ Rp. 35,000.00 14,000.00
0.0200 org Mandor @ Rp. 47,500.00 950.00
JUMLAH ( BELUM PPN ) 25,450.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m1 Pembuatan pagar sementara dari kawat duri tinggi 1,80 meter
6.3 1.0000 btg Dolken kayu Ø 8 - 10/400 cm @ Rp. 10,000.00
03-2835-2002 2.0000 kg PC @ Rp. 1,196.00
25.0000 kg Kawat duri @ Rp. 9,500.00
0.0050 m3 Pasir beton @ Rp. 120,000.00

Analisa Gedung - 41
No. Macam Pekerjaan Upah
(1) (2) (3)
0.0090 m3 Kerikil beton @ Rp. 78,650.00
0.0600 kg Paku biasa 2" - 5" @ Rp. 8,000.00
0.2000 org Tukang kayu @ Rp. 47,500.00 9,500.00
0.0200 org Kepala tukang kayu @ Rp. 50,000.00 1,000.00
0.3000 org Pekerja @ Rp. 35,000.00 10,500.00
0.0200 org Mandor @ Rp. 47,500.00 950.00
JUMLAH ( BELUM PPN ) 21,950.00
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 42
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m2 Pembuatan gudang semen dan alat-alat


6.6 1.7000 btg Dolken kayu Ø 8 - 10/400 cm @ Rp. 10,000.00
03-2835-2002 0.2100 m2 Kayu @ Rp. 2,750,000.00
0.3000 kg Paku biasa @ Rp. 8,000.00
10.5000 kg PC @ Rp. 1,196.00
0.0300 m3 Pasir beton @ Rp. 120,000.00
0.0500 m3 Kerikil beton @ Rp. 78,650.00
1.5000 lbr Seng gelombang BJLS 32 @ Rp. 38,500.00
2.0000 org Tukang kayu @ Rp. 47,500.00 95,000.00
0.2000 org Kepala tukang kayu @ Rp. 50,000.00 10,000.00
1.0000 org Pekerja @ Rp. 35,000.00 35,000.00
0.0500 org Mandor @ Rp. 47,500.00 2,375.00
JUMLAH ( BELUM PPN ) 142,375.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pembuatan rumah jaga/konstruksi kayu


6.7 3.0000 btg Dolken kayu Ø 8 - 10/400 cm @ Rp. 10,000.00
03-2835-2002 0.2760 m 3
Kayu @ Rp. 2,750,000.00
0.7000 kg Paku biasa @ Rp. 8,000.00
1.5000 lbr Seng gelombang BJLS 32 @ Rp. 38,500.00
1.5000 org Tukang kayu @ Rp. 47,500.00 71,250.00
0.1500 org Kepala tukang kayu @ Rp. 50,000.00 7,500.00
1.0000 org Pekerja @ Rp. 35,000.00 35,000.00
0.0500 org Mandor @ Rp. 47,500.00 2,375.00
JUMLAH ( BELUM PPN ) 116,125.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pembuatan bedeng buruh


6.9 1.2500 btg Dolken kayu Ø 8 - 10/400 cm @ Rp. 10,000.00
03-2835-2002 0.1860 m3 Kayu @ Rp. 2,750,000.00
0.3000 kg Paku biasa @ Rp. 8,000.00
18.0000 kg PC @ Rp. 1,196.00
0.0300 m3 Pasir beton @ Rp. 120,000.00
0.0500 m 3
Kerikil beton @ Rp. 78,650.00
1.5000 lbr Seng gelombang BJLS 32 @ Rp. 38,500.00
4.3500 lbr Plywood 4 mm @ Rp. 41,250.00
2.0000 org Tukang kayu @ Rp. 47,500.00 95,000.00
0.2000 org Kepala tukang kayu @ Rp. 50,000.00 10,000.00
1.0000 org Pekerja @ Rp. 35,000.00 35,000.00
0.0500 org Mandor @ Rp. 47,500.00 2,375.00
JUMLAH ( BELUM PPN ) 142,375.00
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 43
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m2 Pembuatan bak adukan, uk. 40 x 50 x 20 cm


6.10 0.0360 m3 Kayu terentang @ Rp. 2,750,000.00
03-2835-2002 0.0800 kg Paku @ Rp. 8,000.00
1.0000 btg Kaso 5/7 @ Rp. 15,225.00
0.3000 org Tukang kayu @ Rp. 47,500.00 14,250.00
0.0015 org Mandor @ Rp. 47,500.00 71.25
JUMLAH ( BELUM PPN ) 14,321.25
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 44
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m2 Pembuatan stegger dari bambu, ukuran 40 x 50 x 20 cm


6.11 1.0000 btg Bambu @ Rp. 9,500.00
03-2835-2002 0.2500 kg Tali ijuk @ Rp. 10,000.00
0.0170 org Tukang kayu @ Rp. 47,500.00 807.50
0.0020 org Kepala tukang kayu @ Rp. 50,000.00 100.00
0.2500 org Pekerja @ Rp. 35,000.00 8,750.00
0.0130 org Mandor @ Rp. 47,500.00 617.50
JUMLAH ( BELUM PPN ) 10,275.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m1 Pasang pagar kawat jaring galvanis, tinggi 1,00 m


6.15 0.4340 lbr Pagar kawat jaring @ Rp. 35,000.00
03-2835-2002 0.0420 org Tukang besi @ Rp. 45,000.00 1,890.00
0.0040 org Kepala tukang besi @ Rp. 47,500.00 190.00
0.0420 org Pekerja @ Rp. 35,000.00 1,470.00
0.0020 org Mandor @ Rp. 47,500.00 95.00
JUMLAH ( BELUM PPN ) 3,645.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m1 Pasang pagar beton pracetak ( 5 x 50 x 213 ) cm


6.16 0.9860 lbr Panel beton pracetak @ Rp. 175,000.00
03-2835-2002 0.5250 btg Kolom beton pracetak @ Rp. 250,000.00
0.0740 m3 Pasir beton @ Rp. 120,000.00
0.1460 m3 Batu pecah 2/3 @ Rp. 145,000.00
45.0000 kg PC @ Rp. 1,196.00
0.1250 org Tukang batu @ Rp. 45,000.00 5,625.00
0.0120 org Kepala tukang @ Rp. 47,500.00 570.00
0.3750 org Pekerja @ Rp. 35,000.00 13,125.00
0.0190 org Mandor @ Rp. 47,500.00 902.50
JUMLAH ( BELUM PPN ) 20,222.50
JASA 10 %
JUMLAH
DIBULATKAN

PEKERJAAN TANAH
SNI 1.0000 m3 Galian tanah biasa sedalam sampai 1 meter
6.1 0.4000 org Pekerja @ Rp. 35,000.00 14,000.00
0.0400 org Mandor @ Rp. 47,500.00 1,900.00
JUMLAH ( BELUM PPN ) 15,900.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m3 Galian tanah biasa sedalam 1 - 2 meter


6.2 0.5260 org Pekerja @ Rp. 35,000.00 18,410.00

Analisa Gedung - 45
No. Macam Pekerjaan Upah
(1) (2) (3)
0.0526 org Mandor @ Rp. 47,500.00 2,498.50
JUMLAH ( BELUM PPN ) 20,908.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m3 Galian tanah biasa sedalam 2 - 3 meter


6.3 0.7350 org Pekerja @ Rp. 35,000.00 25,725.00
0.0735 org Mandor @ Rp. 47,500.00 3,491.25
JUMLAH ( BELUM PPN ) 29,216.25
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 46
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m3 Galian tanah keras sedalam sampai 1 meter


6.4 0.6250 org Pekerja @ Rp. 35,000.00 21,875.00
0.0620 org Mandor @ Rp. 47,500.00 2,945.00
JUMLAH ( BELUM PPN ) 24,820.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m3 Galian tanah cadas sedalam sampai 1 meter


6.5 1.2500 org Pekerja @ Rp. 35,000.00 43,750.00
0.1250 org Mandor @ Rp. 47,500.00 5,937.50
JUMLAH ( BELUM PPN ) 49,687.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m3 Galian tanah lumpur sedalam 1 meter


6.6 0.8230 org Pekerja @ Rp. 35,000.00 28,805.00
0.0830 org Mandor @ Rp. 47,500.00 3,942.50
JUMLAH ( BELUM PPN ) 32,747.50
JASA 10 %
JUMLAH
DIBULATKAN

Mod. SNI 6.3 1.0000 m1 Membuat sumur


2.0000 bh Buis beton D. 80 cm @ Rp. 40,000.00
1.0000 org Tukang gali sumur @ Rp. 35,000.00 35,000.00
0.7350 org Pekerja @ Rp. 35,000.00 25,725.00
0.0735 org Mandor @ Rp. 47,500.00 3,491.25
JUMLAH ( BELUM PPN ) 64,216.25
JASA 10 %
JUMLAH
DIBULATKAN

A6 1.0000 m3 Mengangkut tanah sejauh 30 meter


0.3300 org Pekerja @ Rp. 35,000.00 11,550.00
0.0100 org Mandor @ Rp. 47,500.00 475.00
JUMLAH ( BELUM PPN ) 12,025.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m3 Pembuangan tanah sejauh 150 meter


6.8 0.5160 org Pekerja @ Rp. 35,000.00 18,060.00
0.0500 org Mandor @ Rp. 47,500.00 2,375.00
JUMLAH ( BELUM PPN ) 20,435.00
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 47
No. Macam Pekerjaan Upah
(1) (2) (3)

A14 1.0000 m3 Membuang tanah dengan menghampar


0.2500 org Pekerja @ Rp. 35,000.00 8,750.00
0.0100 org Mandor @ Rp. 47,500.00 475.00
JUMLAH ( BELUM PPN ) 9,225.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m3 Urug kembali bekas galian


6.9 0.1920 org Pekerja @ Rp. 35,000.00 6,720.00
0.0190 org Mandor @ Rp. 47,500.00 902.50
JUMLAH ( BELUM PPN ) 7,622.50
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 48
No. Macam Pekerjaan Upah
(1) (2) (3)

1.0000 m2 Meratakan tanah ditumbuk halus


0.2500 org Pekerja @ Rp. 35,000.00 8,750.00
0.0100 org Mandor @ Rp. 47,500.00 475.00
JUMLAH ( BELUM PPN ) 9,225.00
JASA 10 %
JUMLAH
DIBULATKAN

A18 1.0000 m3 Urug pasir


1.2000 m3 Pasir urug @ Rp. 75,000.00
0.3000 org Pekerja @ Rp. 35,000.00 10,500.00
0.0100 org Mandor @ Rp. 47,500.00 475.00
JUMLAH ( BELUM PPN ) 10,975.00
JASA 10 %
JUMLAH
DIBULATKAN

MOD 1.0000 m3 Urug tanah mendatangkan


A18 1.2000 m3 Tanah urug @ Rp. 45,000.00
0.3000 org Pekerja @ Rp. 35,000.00 10,500.00
0.0100 org Mandor @ Rp. 47,500.00 475.00
JUMLAH ( BELUM PPN ) 10,975.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m3 Urugan sirtu


6.15 1.2000 m3 Sirtu @ Rp. 90,000.00
0.2500 org Pekerja @ Rp. 35,000.00 8,750.00
0.0250 org Mandor @ Rp. 47,500.00 1,187.50
JUMLAH ( BELUM PPN ) 9,937.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m3 Pemasangan lapisan ijuk


6.14 1.2000 m3 Ijuk @ Rp. 75,000.00
0.1500 org Pekerja @ Rp. 35,000.00 5,250.00
0.0150 org Mandor @ Rp. 47,500.00 712.50
JUMLAH ( BELUM PPN ) 5,962.50
JASA 10 %
JUMLAH
DIBULATKAN

MOD 1.0000 m2 Gebalan rumput


B3 0.2000 btg Bambu @ Rp. 7,000.00
1.0000 m Gebalan rumput
2
@ Rp. 5,000.00
0.5000 org Pekerja @ Rp. 35,000.00 17,500.00

Analisa Gedung - 49
No. Macam Pekerjaan Upah
(1) (2) (3)
0.0250 org Mandor @ Rp. 47,500.00 1,187.50
JUMLAH ( BELUM PPN ) 18,687.50
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 50
No. Macam Pekerjaan Upah
(1) (2) (3)

PEKERJAAN PASANGAN

SNI 1.0000 m3 Pasangan pondasi batu kosong


6.14 1.2000 m3 Batu belah 15/20 cm @ Rp. 107,250.00
03-2836-2002 0.3000 m 3
Pasir urug @ Rp. 75,000.00
0.3900 org Tukang batu @ Rp. 45,000.00 17,550.00
0.0390 org Kepala tukang batu @ Rp. 47,500.00 1,852.50
0.7800 org Pekerja @ Rp. 35,000.00 27,300.00
0.0390 org Mandor @ Rp. 47,500.00 1,852.50
JUMLAH ( BELUM PPN ) 48,555.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m3 Pasangan pondasi 1 Kp : 1 Sm : 1 Ps


6.9 1.1000 m3 Batu belah (hitam) 15/20 cm @ Rp. 107,250.00
03-2836-2002 0.2290 m3 Kapurr pasang @ Rp. 72,500.00
0.2290 m Semen merah
3
@ Rp. 80,000.00
0.5440 m3 Pasir pasang @ Rp. 145,000.00
0.6000 org Tukang batu @ Rp. 45,000.00 27,000.00
0.0600 org Kepala tukang batu @ Rp. 47,500.00 2,850.00
1.5000 org Pekerja @ Rp. 35,000.00 52,500.00
0.0750 org Mandor @ Rp. 47,500.00 3,562.50
JUMLAH ( BELUM PPN ) 85,912.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m3 Pasangan pondasi 1 Kp : 1 Sm : 2 Ps


6.10 1.1000 m3 Batu belah (hitam) 15/20 cm @ Rp. 107,250.00
03-2836-2002 0.1700 m Kapurr pasang
3
@ Rp. 72,500.00
0.1700 m3 Semen merah @ Rp. 80,000.00
0.3400 m3 Pasir pasang @ Rp. 145,000.00
0.6000 org Tukang batu @ Rp. 45,000.00 27,000.00
0.0600 org Kepala tukang batu @ Rp. 47,500.00 2,850.00
1.5000 org Pekerja @ Rp. 35,000.00 52,500.00
0.0750 org Mandor @ Rp. 47,500.00 3,562.50
JUMLAH ( BELUM PPN ) 85,912.50
JASA 10 %
JUMLAH
DIBULATKAN

1.0000 m3 Pasangan pondasi 1 Pc : 3 Kp : 5 Ps


1.2000 m3 Batu belah (hitam) 15/20 cm @ Rp. 107,250.00
95.4200 kg PC @ Rp. 1,196.00
0.2290 m3 Kapurr pasang @ Rp. 72,500.00
0.3820 m3 Pasir pasang @ Rp. 145,000.00

Analisa Gedung - 51
No. Macam Pekerjaan Upah
(1) (2) (3)
0.6000 org Tukang batu @ Rp. 45,000.00 27,000.00
0.0600 org Kepala tukang batu @ Rp. 47,500.00 2,850.00
1.5000 org Pekerja @ Rp. 35,000.00 52,500.00
0.0750 org Mandor @ Rp. 47,500.00 3,562.50
JUMLAH ( BELUM PPN ) 85,912.50
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 52
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m3 Pasangan pondasi 1 Pc : 3 Kp : 10 Ps


6.12 1.1000 m3 Batu belah (hitam) 15/20 cm @ Rp. 107,250.00
03-2835-2002 61.0000 kg PC @ Rp. 1,196.00
0.1470 m3 Kapurr pasang @ Rp. 72,500.00
0.4920 m3 Pasir pasang @ Rp. 145,000.00
0.6000 org Tukang batu @ Rp. 45,000.00 27,000.00
0.0600 org Kepala tukang batu @ Rp. 47,500.00 2,850.00
1.5000 org Pekerja @ Rp. 35,000.00 52,500.00
0.0750 org Mandor @ Rp. 47,500.00 3,562.50
JUMLAH ( BELUM PPN ) 85,912.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m3 Pasangan pondasi 1 Pc : 4 Ps


6.5 1.1000 m3 Batu belah 15/20 cm @ Rp. 107,250.00
03-2836-2002 163.0000 kg PC @ Rp. 1,196.00
0.5200 m3 Pasir pasang @ Rp. 145,000.00
0.6000 org Tukang batu @ Rp. 45,000.00 27,000.00
0.0600 org Kepala tukang batu @ Rp. 47,500.00 2,850.00
1.5000 org Pekerja @ Rp. 35,000.00 52,500.00
0.0750 org Mandor @ Rp. 47,500.00 3,562.50
JUMLAH ( BELUM PPN ) 85,912.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m3 Pasangan pondasi 1 Pc : 3 Ps


6.4 1.1000 m3 Batu belah 15/20 cm @ Rp. 107,250.00
03-2836-2002 202.0000 kg PC @ Rp. 1,196.00
0.4850 m3 Pasir pasang @ Rp. 145,000.00
0.6000 org Tukang batu @ Rp. 45,000.00 27,000.00
0.0600 org Kepala tukang batu @ Rp. 47,500.00 2,850.00
1.5000 org Pekerja @ Rp. 35,000.00 52,500.00
0.0750 org Mandor @ Rp. 47,500.00 3,562.50
JUMLAH ( BELUM PPN ) 85,912.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m3 Pasangan pondasi 1 Pc : 1 Ps


6.1 1.1000 m3 Batu belah 15/20 cm @ Rp. 107,250.00
03-2835-2002 392.0000 kg PC @ Rp. 1,196.00
0.3140 m3 Pasir pasang @ Rp. 145,000.00
0.6000 org Tukang batu @ Rp. 45,000.00 27,000.00
0.0600 org Kepala tukang batu @ Rp. 47,500.00 2,850.00
1.5000 org Pekerja @ Rp. 35,000.00 52,500.00
0.0750 org Mandor @ Rp. 47,500.00 3,562.50

Analisa Gedung - 53
No. Macam Pekerjaan Upah
(1) (2) (3)
JUMLAH ( BELUM PPN ) 85,912.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m3 Pasangan pondasi 1 Pc : 2 Ps


6.2 1.1000 m3 Batu belah 15/20 cm @ Rp. 107,250.00
03-2835-2002 267.0000 kg PC @ Rp. 1,196.00
0.4270 m3 Pasir pasang @ Rp. 145,000.00
0.6000 org Tukang batu @ Rp. 45,000.00 27,000.00
0.0600 org Kepala tukang batu @ Rp. 47,500.00 2,850.00
1.5000 org Pekerja @ Rp. 35,000.00 52,500.00
0.0750 org Mandor @ Rp. 47,500.00 3,562.50
JUMLAH ( BELUM PPN ) 85,912.50
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 54
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m3 Pasangan pondasi 1 Pc : 5 Ps


6.6 1.1000 m3 Batu belah 15/20 cm @ Rp. 107,250.00
03-2835-2002 136.0000 kg PC @ Rp. 1,196.00
0.5440 m3 Pasir pasang @ Rp. 145,000.00
0.6000 org Tukang batu @ Rp. 45,000.00 27,000.00
0.0600 org Kepala tukang batu @ Rp. 47,500.00 2,850.00
1.5000 org Pekerja @ Rp. 35,000.00 52,500.00
0.0750 org Mandor @ Rp. 47,500.00 3,562.50
JUMLAH ( BELUM PPN ) 85,912.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasangan bata merah tebal 1/2 bata, 1 Kp : 1 Sm : 1Ps


6.17 70.0000 bh Bata merah 5 x 11 x 22 cm @ Rp. 500.00
03-2837-2002 0.0180 m3 Kapur pasang @ Rp. 72,500.00
0.0180 m3 Semen merah @ Rp. 80,000.00
0.0180 m 3
Pasir pasang @ Rp. 145,000.00
0.1000 org Tukang batu @ Rp. 45,000.00 4,500.00
0.0100 org Kepala tukang batu @ Rp. 47,500.00 475.00
0.3200 org Pekerja @ Rp. 35,000.00 11,200.00
0.0150 org Mandor @ Rp. 47,500.00 712.50
JUMLAH ( BELUM PPN ) 16,887.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Kp : 10 Ps


6.15 70.0000 bh Bata merah 5 x 11 x 22 cm @ Rp. 500.00
03-2837-2002 4.5000 kg PC @ Rp. 1,196.00
0.0150 m3 Kapur pasang @ Rp. 72,500.00
0.0500 m3 Pasir pasang @ Rp. 145,000.00
0.1000 org Tukang batu @ Rp. 45,000.00 4,500.00
0.0100 org Kepala tukang batu @ Rp. 47,500.00 475.00
0.3200 org Pekerja @ Rp. 35,000.00 11,200.00
0.0150 org Mandor @ Rp. 47,500.00 712.50
JUMLAH ( BELUM PPN ) 16,887.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 4 Ps


6.11 70.0000 bh Bata merah 5 x 11 x 22 cm @ Rp. 500.00
03-2837-2002 11.5000 kg PC @ Rp. 1,196.00
0.0430 m3 Pasir pasang @ Rp. 145,000.00
0.1000 org Tukang batu @ Rp. 45,000.00 4,500.00
0.0100 org Kepala tukang batu @ Rp. 47,500.00 475.00
0.3200 org Pekerja @ Rp. 35,000.00 11,200.00

Analisa Gedung - 55
No. Macam Pekerjaan Upah
(1) (2) (3)
0.0150 org Mandor @ Rp. 47,500.00 712.50
JUMLAH ( BELUM PPN ) 16,887.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps


6.10 70.0000 bh Bata merah 5 x 11 x 22 cm @ Rp. 500.00
03-2837-2002 14.3700 kg PC @ Rp. 1,196.00
0.0400 m3 Pasir pasang @ Rp. 145,000.00
0.1000 org Tukang batu @ Rp. 45,000.00 4,500.00
0.0100 org Kepala tukang batu @ Rp. 47,500.00 475.00
0.3200 org Pekerja @ Rp. 35,000.00 11,200.00
0.0150 org Mandor @ Rp. 47,500.00 712.50
JUMLAH ( BELUM PPN ) 16,887.50
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 56
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 2 Ps


6.9 70.0000 bh Bata merah 5 x 11 x 22 cm @ Rp. 500.00
03-2837-2002 18.9500 kg PC @ Rp. 1,196.00
0.0380 m3 Pasir pasang @ Rp. 145,000.00
0.1000 org Tukang batu @ Rp. 45,000.00 4,500.00
0.0100 org Kepala tukang batu @ Rp. 47,500.00 475.00
0.3200 org Pekerja @ Rp. 35,000.00 11,200.00
0.0150 org Mandor @ Rp. 47,500.00 712.50
JUMLAH ( BELUM TERMASUK PPN ) 16,887.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 3 Kp : 10 Ps


6.7 140.0000 bh Bata merah 5 x 11 x 22 cm @ Rp. 500.00
03-2837-2002 10.0800 kg PC @ Rp. 1,196.00
0.0275 m3 Kapur pasang @ Rp. 72,500.00
0.0925 m3 Pasir pasang @ Rp. 145,000.00
0.2000 org Tukang batu @ Rp. 45,000.00 9,000.00
0.0200 org Kepala tukang batu @ Rp. 47,500.00 950.00
0.6500 org Pekerja @ Rp. 35,000.00 22,750.00
0.0300 org Mandor @ Rp. 47,500.00 1,425.00
JUMLAH ( BELUM PPN ) 34,125.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 4 Ps


6.4 140.0000 bh Bata merah 5 x 11 x 22 cm @ Rp. 500.00
03-2837-2002 26.4500 kg PC @ Rp. 1,196.00
0.0980 m3 Pasir pasang @ Rp. 145,000.00
0.2000 org Tukang batu @ Rp. 45,000.00 9,000.00
0.0200 org Kepala tukang batu @ Rp. 47,500.00 950.00
0.6500 org Pekerja @ Rp. 35,000.00 22,750.00
0.0300 org Mandor @ Rp. 47,500.00 1,425.00
JUMLAH ( BELUM PPN ) 34,125.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 3 Ps


6.3 140.0000 bh Bata merah 5 x 11 x 22 cm @ Rp. 500.00
03-2837-2002 32.9500 kg PC @ Rp. 1,196.00
0.0910 m3 Pasir pasang @ Rp. 145,000.00
0.2000 org Tukang batu @ Rp. 45,000.00 9,000.00
0.0200 org Kepala tukang batu @ Rp. 47,500.00 950.00
0.6500 org Pekerja @ Rp. 35,000.00 22,750.00
0.0300 org Mandor @ Rp. 47,500.00 1,425.00

Analisa Gedung - 57
No. Macam Pekerjaan Upah
(1) (2) (3)
JUMLAH ( BELUM PPN ) 34,125.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 2 Ps


6.2 140.0000 bh Bata merah 5 x 11 x 22 cm @ Rp. 500.00
03-2837-2002 43.5000 kg PC @ Rp. 1,196.00
0.0800 m3 Pasir pasang @ Rp. 145,000.00
0.2000 org Tukang batu @ Rp. 45,000.00 9,000.00
0.0200 org Kepala tukang batu @ Rp. 47,500.00 950.00
0.6500 org Pekerja @ Rp. 35,000.00 22,750.00
0.0300 org Mandor @ Rp. 47,500.00 1,425.00
JUMLAH ( BELUM TERMASUK PPN ) 34,125.00
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 58
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m2 Pasangan dinding bataco


6.18 12.5000 bh Bataco @ Rp. 1,500.00
12.5000 kg PC @ Rp. 1,196.00
0.0400 m3 Pasir pasang @ Rp. 145,000.00
0.1000 org Tukang batu @ Rp. 45,000.00 4,500.00
0.0100 org Kepala tukang batu @ Rp. 47,500.00 475.00
0.5000 org Pekerja @ Rp. 35,000.00 17,500.00
0.0250 org Mandor @ Rp. 47,500.00 1,187.50
JUMLAH ( BELUM PPN ) 23,662.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasangan roster 25/25 cm


6.19 16.0000 bh Roster 25/25 cm @ Rp. 2,000.00
12.5000 kg PC @ Rp. 1,196.00
0.0400 m3 Pasir pasang @ Rp. 145,000.00
0.1000 org Tukang batu @ Rp. 45,000.00 4,500.00
0.0100 org Kepala tukang batu @ Rp. 47,500.00 475.00
0.5000 org Pekerja @ Rp. 35,000.00 17,500.00
0.0250 org Mandor @ Rp. 47,500.00 1,187.50
JUMLAH ( BELUM PPN ) 23,662.50
JASA 10 %
JUMLAH
DIBULATKAN

PEKERJAAN BETON
SNI 1.0000 m3 Membuat beton bertulang, 1 Pc : 2 Ps : 3 Kr
6.13 336.0000 kg PC @ Rp. 1,196.00
0.5400 m3 Pasir beton @ Rp. 120,000.00
0.8100 m 3
Kerikil beton @ Rp. 78,650.00
0.3500 org Tukang batu @ Rp. 45,000.00 15,750.00
0.0350 org Kepala tukang batu @ Rp. 47,500.00 1,662.50
2.0000 org Pekerja @ Rp. 35,000.00 70,000.00
0.1000 org Mandor @ Rp. 47,500.00 4,750.00
JUMLAH ( BELUM PPN ) 92,162.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m3 Membuat beton tumbuk, 1 Pc : 3 Ps : 5 Kr


6.1 218.0000 kg PC @ Rp. 1,196.00
0.5200 m3 Pasir beton @ Rp. 120,000.00
0.8700 m3 Kerikil beton @ Rp. 78,650.00
0.2500 org Tukang batu @ Rp. 45,000.00 11,250.00
0.0250 org Kepala tukang batu @ Rp. 47,500.00 1,187.50
1.6500 org Pekerja @ Rp. 35,000.00 57,750.00
0.0800 org Mandor @ Rp. 47,500.00 3,800.00

Analisa Gedung - 59
No. Macam Pekerjaan Upah
(1) (2) (3)
JUMLAH ( BELUM PPN ) 73,987.50
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m3 Beton cyclope 1pc:3ps:5kr


0.7000 m3 Batu kali (hitam) @ Rp. 107,250.00
61.2500 kg PC @ Rp. 1,196.00
0.4000 m3 Pasir pasang @ Rp. 145,000.00
0.6500 m3 Kerikil beton @ Rp. 78,650.00
1.0000 org Tukang batu @ Rp. 45,000.00 45,000.00
0.1000 org Kep. Tk. Batu @ Rp. 47,500.00 4,750.00
6.0000 org Pekerja @ Rp. 35,000.00 210,000.00
0.3000 org Mandor @ Rp. 47,500.00 14,250.00
JUMLAH ( BELUM PPN ) 274,000.00
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 60
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m3 Membuat beton bertulang, 1 Pc : 1,5 Ps : 2,5 Kr


6.16 400.0000 kg PC @ Rp. 1,196.00
0.4800 m3 Pasir beton @ Rp. 120,000.00
0.8000 m 3
Kerikil beton @ Rp. 78,650.00
0.3500 org Tukang batu @ Rp. 45,000.00 15,750.00
0.0350 org Kepala tukang batu @ Rp. 47,500.00 1,662.50
2.0000 org Pekerja @ Rp. 35,000.00 70,000.00
1.0000 org Mandor @ Rp. 47,500.00 47,500.00
JUMLAH ( BELUM PPN ) 134,912.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m3 Membuat beton dengan mutu K 225


6.35 388.0000 kg PC @ Rp. 1,196.00
0.6500 m3 Pasir beton @ Rp. 120,000.00
0.6500 m3 Kerikil beton @ Rp. 78,650.00
1.0000 org Tukang batu @ Rp. 45,000.00 45,000.00
0.1000 org Kepala tukang batu @ Rp. 47,500.00 4,750.00
6.0000 org Pekerja @ Rp. 35,000.00 210,000.00
0.3000 org Mandor @ Rp. 47,500.00 14,250.00
JUMLAH ( BELUM PPN ) 274,000.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m3 Membuat beton dengan mutu K 275


6.36 400.0000 kg PC @ Rp. 1,196.00
0.4000 m Pasir beton
3
@ Rp. 120,000.00
0.8200 m3 Kerikil beton @ Rp. 78,650.00
1.0000 org Tukang batu @ Rp. 45,000.00 45,000.00
0.1000 org Kepala tukang batu @ Rp. 47,500.00 4,750.00
6.0000 org Pekerja @ Rp. 35,000.00 210,000.00
0.3000 org Mandor @ Rp. 47,500.00 14,250.00
JUMLAH ( BELUM PPN ) 274,000.00
JASA 10 %
JUMLAH
DIBULATKAN

1.0000 m3 Membuat beton dengan mutu K 300


430.0000 kg PC @ Rp. 1,196.00
0.5160 m3 Pasir beton @ Rp. 120,000.00
0.6900 m 3
Kerikil beton @ Rp. 78,650.00
1.0000 org Tukang batu @ Rp. 45,000.00 45,000.00
0.1000 org Kepala tukang batu @ Rp. 47,500.00 4,750.00
6.0000 org Pekerja @ Rp. 35,000.00 210,000.00
0.3000 org Mandor @ Rp. 47,500.00 14,250.00
JUMLAH ( BELUM PPN ) 274,000.00

Analisa Gedung - 61
No. Macam Pekerjaan Upah
(1) (2) (3)
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 kg Pembesian dengan besi polos


6.25 1.0500 kg Besi beton polos @ Rp. 12,500.00
0.0150 kg Kawat beton @ Rp. 12,100.00
0.0070 org Tukang besi @ Rp. 45,000.00 315.00
0.0007 org Kepala tukang besi @ Rp. 47,500.00 33.25
0.0070 org Pekerja @ Rp. 35,000.00 245.00
0.0003 org Mandor @ Rp. 47,500.00 14.25
JUMLAH ( BELUM PPN ) 607.50
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 62
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 kg Pembesian dengan besi ulir


6.25 1.0500 kg Besi beton ulir @ Rp. 11,000.00
0.0150 kg Kawat beton @ Rp. 12,100.00
0.0070 org Tukang besi @ Rp. 45,000.00 315.00
0.0007 org Kepala tukang besi @ Rp. 47,500.00 33.25
0.0070 org Pekerja @ Rp. 35,000.00 245.00
0.0003 org Mandor @ Rp. 47,500.00 14.25
JUMLAH ( BELUM PPN ) 607.50
JASA 10 %
JUMLAH
DIBULATKAN

F.8 1.0000 m2 Cetakan beton / begisting memakai papan


0.0170 m3 Usuk meranti @ Rp. 2,750,000.00
0.0240 m3 Papan cetakan @ Rp. 1,000,000.00
0.4000 kg Paku @ Rp. 9,000.00
0.5000 org Tukang kayu @ Rp. 47,500.00 23,750.00
0.0500 org Kep. Tk. Kayu @ Rp. 50,000.00 2,500.00
0.2000 org Pekerja @ Rp. 35,000.00 7,000.00
0.0100 org Mandor @ Rp. 47,500.00 475.00
JUMLAH ( BELUM PPN ) 33,725.00
JASA 10 %
JUMLAH
DIBULATKAN

F.8 1.0000 m2 Cetakan beton / begisting memakai multiplek


0.0170 m3 Usuk meranti @ Rp. 2,750,000.00
0.3470 lbr Multiplek @ Rp. 90,000.00
0.4000 kg Paku @ Rp. 9,000.00
0.5000 org Tukang kayu @ Rp. 47,500.00 23,750.00
0.0500 org Kep. Tk. Kayu @ Rp. 50,000.00 2,500.00
0.2000 org Pekerja @ Rp. 35,000.00 7,000.00
0.0100 org Mandor @ Rp. 47,500.00 475.00
JUMLAH ( BELUM PPN ) 33,725.00
JASA 10 %
JUMLAH
DIBULATKAN

F.V 1.0000 m3 Membongkar cetakan


1.5000 org Pekerja @ Rp. 35,000.00 52,500.00
JUMLAH ( BELUM PPN ) 52,500.00
JASA 10 %
JUMLAH
DIBULATKAN

Sup Stutwerk untuk 1 m3 beton, tinggi 3 - 4 m ( memakai dolken )


muko2 0.7000 m3 Perancah/dolken @ Rp. 500,000.00
hal 10.5000 org Tukang kayu @ Rp. 47,500.00 498,750.00
332 1.0500 org Kep. Tk. Kayu @ Rp. 50,000.00 52,500.00

Analisa Gedung - 63
No. Macam Pekerjaan Upah
(1) (2) (3)
3.5000 org Pekerja @ Rp. 35,000.00 122,500.00
0.1750 org Mandor @ Rp. 47,500.00 8,312.50
JUMLAH ( BELUM PPN ) 682,062.50
JASA 10 %
JUMLAH
DIBULATKAN

Stutwerk untuk 1 m3 beton, tinggi 3 - 4 m ( memakai scafolding )


32.0000 unit Scafolding @ Rp. 20,000.00
3.5000 org Tukang kayu @ Rp. 47,500.00 166,250.00
0.3500 org Kep. Tk. Kayu @ Rp. 50,000.00 17,500.00
2.2000 org Pekerja @ Rp. 35,000.00 77,000.00
0.1200 org Mandor @ Rp. 47,500.00 5,700.00
JUMLAH ( BELUM TERMASUK PPN ) 266,450.00
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 64
No. Macam Pekerjaan Upah
(1) (2) (3)

REKAPITULASI (CONTOH UNTUK 100 KG BESI)

Pekerjaan beton bertulang 1:2:3 tanpa dolken, 100 kg besi


A. Beton cor 1pc:2ps:3kr
B. Tulangan 100 kg
C. Cetakan memakai papan ( 10 m2 )
D. Membongkar cetakan
JUMLAH
DIBULATKAN

REKAPITULASI (CONTOH UNTUK 125 KG BESI)

Pekerjaan beton bertulang 1:2:3 tanpa dolken, 125 kg besi


A. Beton cor 1pc:2ps:3kr
B. Tulangan 125 kg
C. Cetakan memakai papan ( 10 m2 )
D. Membongkar cetakan
JUMLAH
DIBULATKAN

REKAPITULASI (CONTOH UNTUK 150 KG BESI)

Pekerjaan beton bertulang 1:2:3 tanpa dolken, 150 kg besi


A. Beton cor 1pc:2ps:3kr
B. Tulangan 150 kg
C. Cetakan memakai papan ( 10 m2 )
E. Membongkar cetakan
JUMLAH
DIBULATKAN

REKAPITULASI (CONTOH UNTUK 175 KG BESI)

Pekerjaan beton bertulang 1:2:3 tanpa dolken, 175 kg besi


A. Beton cor 1pc:2ps:3kr
B. Tulangan 175 kg
C. Cetakan memakai papan ( 10 m2 )
D. Membongkar cetakan
JUMLAH
DIBULATKAN

REKAPITULASI (CONTOH UNTUK 200 KG BESI)

Pekerjaan beton bertulang 1:2:3 tanpa dolken, 200 kg besi


A. Beton cor 1pc:2ps:3kr
B. Tulangan 200 kg
C. Cetakan memakai papan ( 10 m2 )
D. Membongkar cetakan
JUMLAH
DIBULATKAN

Analisa Gedung - 65
No. Macam Pekerjaan Upah
(1) (2) (3)

REKAPITULASI (CONTOH UNTUK 100 KG BESI)

Pekerjaan beton bertulang 1:2:3 dengan memakai dolken, 100 kg besi


A. Beton cor 1pc:2ps:3kr
B. Tulangan 100 kg
C. Cetakan memakai papan ( 10 m2 )

Analisa Gedung - 66
No. Macam Pekerjaan Upah
(1) (2) (3)
D. Stut werk / perancah
E. Membongkar cetakan
JUMLAH
DIBULATKAN

REKAPITULASI (CONTOH UNTUK 125 KG BESI)

Pekerjaan beton bertulang 1:2:3 dengan memakai dolken, 125 kg besi


A. Beton cor 1pc:2ps:3kr
B. Tulangan 125 kg
C. Cetakan memakai papan ( 10 m2 )
D. Stut werk / perancah
E. Membongkar cetakan
JUMLAH
DIBULATKAN

REKAPITULASI (CONTOH UNTUK 150 KG BESI)

Pekerjaan beton bertulang 1:2:3 dengan memakai dolken 150 kg besi


A. Beton cor 1pc:2ps:3kr
B. Tulangan 150 kg
C. Cetakan memakai papan ( 10 m2 )
D. Stut werk / perancah
E. Membongkar cetakan
JUMLAH
DIBULATKAN

REKAPITULASI (CONTOH UNTUK 150 KG BESI)

Pekerjaan beton bertulang K275 dengan memakai dolken, 150 kg besi


A. Beton cor 1pc:2ps:3kr
B. Tulangan 150 kg
C. Cetakan memakai papan ( 10 m2 )
D. Stut werk / perancah
E. Membongkar cetakan
JUMLAH
DIBULATKAN

REKAPITULASI (CONTOH UNTUK 175 KG BESI)

Pekerjaan beton bertulang 1:2:3 dengan memakai dolken, 175 kg besi


A. Beton cor 1pc:2ps:3kr
B. Tulangan 175 kg
C. Cetakan memakai papan ( 10 m2 )
D. Stut werk / perancah
E. Membongkar cetakan
JUMLAH
DIBULATKAN

Analisa Gedung - 67
No. Macam Pekerjaan Upah
(1) (2) (3)
REKAPITULASI (CONTOH UNTUK 200 KG BESI)

Pekerjaan beton bertulang 1:2:3 dengan memakai dolken, 200 kg besi


A. Beton cor 1pc:2ps:3kr
B. Tulangan 200 kg
C. Cetakan memakai papan ( 10 m2 )
D. Stut werk / perancah
E. Membongkar cetakan
JUMLAH
DIBULATKAN

REKAPITULASI (CONTOH UNTUK 100 KG BESI)

Pekerjaan beton bertulang 1:2:3 dengan memakai scaffolding, 100 kg besi


A. Beton cor 1pc:2ps:3kr
B. Tulangan 100 kg
C. Cetakan memakai papan ( 10 m2 )
D. Scafolding / perancah
E. Membongkar cetakan
JUMLAH
DIBULATKAN

REKAPITULASI (CONTOH UNTUK 125 KG BESI)

Pekerjaan beton bertulang 1:2:3 dengan memakai scaffolding, 125 kg besi


A. Beton cor 1pc:2ps:3kr
B. Tulangan 125 kg
C. Cetakan memakai papan ( 10 m2 )
D. Scafolding / perancah
E. Membongkar cetakan
JUMLAH
DIBULATKAN

Analisa Gedung - 68
No. Macam Pekerjaan Upah
(1) (2) (3)

REKAPITULASI (CONTOH UNTUK 150 KG BESI)

Pekerjaan beton bertulang 1:2:3 dengan memakai scaffolding, 150 kg besi


A. Beton cor 1pc:2ps:3kr
B. Tulangan 150 kg
C. Cetakan memakai papan ( 10 m2 )
D. Scafolding / perancah
E. Membongkar cetakan
JUMLAH
DIBULATKAN

REKAPITULASI (CONTOH UNTUK 175 KG BESI)

Pekerjaan beton bertulang 1:2:3 dengan memakai scaffolding, 175 kg besi


A. Beton cor 1pc:2ps:3kr
B. Tulangan 175 kg
C. Cetakan memakai papan ( 10 m2 )
D. Scafolding / perancah
E. Membongkar cetakan
JUMLAH
DIBULATKAN

REKAPITULASI (CONTOH UNTUK 200 KG BESI)

Pekerjaan beton bertulang 1:2:3 dengan memakai scaffolding, 200 kg besi


A. Beton cor 1pc:2ps:3kr
B. Tulangan 200 kg
C. Cetakan memakai papan ( 10 m2 )
D. Scafolding / perancah
E. Membongkar cetakan
JUMLAH
DIBULATKAN

SNI 1.0000 m1 Pembuatan tiang pancang (40 x 40) cm, beton bertulang
6.17 0.0190 m3 Pasir urug @ Rp. 75,000.00
03-2836-2002 0.0940 m Pasir beton
3
@ Rp. 120,000.00
0.1500 m3 Batu pecah 2/3 @ Rp. 145,000.00
60.5000 kg PC @ Rp. 1,196.00
45.0000 kg Besi beton @ Rp. 12,500.00
0.9000 kg Kawat beton @ Rp. 12,100.00
0.0320 m3 Kayu kruing 5/7 @ Rp. 4,350,000.00
0.1200 kg Paku reng @ Rp. 9,000.00
0.0900 ltr Minyak bekisting @ Rp. 5,000.00
0.2400 kg Plamur tembok @ Rp. 17,500.00
0.6700 org Tukang batu @ Rp. 45,000.00 30,150.00
0.0670 org Kepala tukang batu @ Rp. 47,500.00 3,182.50
1.0000 org Pekerja @ Rp. 35,000.00 35,000.00
0.0500 org Mandor @ Rp. 47,500.00 2,375.00
JUMLAH ( BELUM PPN ) 70,707.50

Analisa Gedung - 69
No. Macam Pekerjaan Upah
(1) (2) (3)
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 70
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m1 Pembuatan tiang pancang (35 x 35) cm, beton bertulang
6.18 0.0160 m3 Pasir urug @ Rp. 75,000.00
03-2836-2002 0.0800 m Pasir beton
3
@ Rp. 120,000.00
0.1250 m3 Batu pecah 2/3 @ Rp. 145,000.00
49.0000 kg PC @ Rp. 1,196.00
34.5000 kg Besi beton @ Rp. 12,500.00
0.7000 kg Kawat beton @ Rp. 12,100.00
0.0270 m3 Kayu kruing 5/7 @ Rp. 4,350,000.00
0.1200 kg Paku @ Rp. 9,000.00
0.0900 ltr Minyak bekisting @ Rp. 5,000.00
0.2000 kg Plamur tembok @ Rp. 17,500.00
0.5000 org Tukang batu @ Rp. 45,000.00 22,500.00
0.0500 org Kepala tukang batu @ Rp. 47,500.00 2,375.00
0.8000 org Pekerja @ Rp. 35,000.00 28,000.00
0.0400 org Mandor @ Rp. 47,500.00 1,900.00
JUMLAH ( BELUM PPN ) 54,775.00
JASA 10 %
JUMLAH
DIBULATKAN

PEKERJAAN PELESTERAN

G.50.P 1.0000 m2 Plesteran batu kali 1pc:1/2kp:5ps tebal 10 mm


5.1000 kg PC @ Rp. 1,196.00
0.0014 m3 Kapur pasang @ Rp. 72,500.00
0.0136 m3 Pasir pasang @ Rp. 145,000.00
0.2000 org Tukang batu @ Rp. 45,000.00 9,000.00
0.0200 org Kep. Tk. Batu @ Rp. 47,500.00 950.00
0.4000 org Pekerja @ Rp. 35,000.00 14,000.00
0.0200 org Mandor @ Rp. 47,500.00 950.00
JUMLAH ( BELUM PPN ) 24,900.00
JASA 10 %
JUMLAH
DIBULATKAN

G.50..I 1.0000 m2 Plesteran batu kali 1pc:3ps


8.1600 kg PC @ Rp. 1,196.00
0.0194 m 3
Pasir pasang @ Rp. 145,000.00
0.2000 org Tukang batu @ Rp. 45,000.00 9,000.00
0.0200 org Kep. Tk. Batu @ Rp. 47,500.00 950.00
0.4000 org Pekerja @ Rp. 35,000.00 14,000.00
0.0200 org Mandor @ Rp. 47,500.00 950.00
JUMLAH ( BELUM PPN ) 24,900.00
JASA 10 %
JUMLAH
DIBULATKAN

G.50.q 1.0000 m2 Plesteran batu kali 1pc:4ps

Analisa Gedung - 71
No. Macam Pekerjaan Upah
(1) (2) (3)
6.5110 kg PC @ Rp. 1,196.00
0.0209 m3 Pasir pasang @ Rp. 145,000.00
0.2000 org Tukang batu @ Rp. 45,000.00 9,000.00
0.0200 org Kep. Tk. Batu @ Rp. 47,500.00 950.00
0.4000 org Pekerja @ Rp. 35,000.00 14,000.00
0.0200 org Mandor @ Rp. 47,500.00 950.00
JUMLAH ( BELUM PPN ) 24,900.00
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 72
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m2 Plesteran 1 Kp : 1 Sm : 2 Ps, tebal 15 mm


6.12 0.0070 m3 Kapurr pasang @ Rp. 72,500.00
03-2837-2002 0.0070 m Semen merah
3
@ Rp. 80,000.00
0.0150 m3 Pasir pasang @ Rp. 145,000.00
0.1500 org Tukang batu @ Rp. 45,000.00 6,750.00
0.0150 org Kepala tukang batu @ Rp. 47,500.00 712.50
0.2000 org Pekerja @ Rp. 35,000.00 7,000.00
0.0100 org Mandor @ Rp. 47,500.00 475.00
JUMLAH ( BELUM PPN ) 14,937.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Plesteran 1 Pc : 3 Kp : 10 Ps, tebal 15 mm


6.9 1.8400 kg PC @ Rp. 1,196.00
03-2837-2002 0.0060 m3 Kapurr pasang @ Rp. 72,500.00
0.0140 m 3
Pasir pasang @ Rp. 145,000.00
0.1500 org Tukang batu @ Rp. 45,000.00 6,750.00
0.0150 org Kepala tukang batu @ Rp. 47,500.00 712.50
0.2000 org Pekerja @ Rp. 35,000.00 7,000.00
0.0100 org Mandor @ Rp. 47,500.00 475.00
JUMLAH ( BELUM TERMASUK PPN ) 14,937.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Plesteran 1 Pc : 2 Ps, tebal 15 mm


6.2 8.5200 kg PC @ Rp. 1,196.00
03-2837-2002 0.0170 m3 Pasir pasang @ Rp. 145,000.00
0.1500 org Tukang batu @ Rp. 45,000.00 6,750.00
0.0150 org Kepala tukang batu @ Rp. 47,500.00 712.50
0.2000 org Pekerja @ Rp. 35,000.00 7,000.00
0.0100 org Mandor @ Rp. 47,500.00 475.00
JUMLAH ( BELUM TERMASUK PPN ) 14,937.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Plesteran 1 Pc : 3 Ps, tebal 15 mm


6.3 6.4800 kg PC @ Rp. 1,196.00
03-2837-2002 0.0190 m3 Pasir pasang @ Rp. 145,000.00
0.1500 org Tukang batu @ Rp. 45,000.00 6,750.00
0.0150 org Kepala tukang batu @ Rp. 47,500.00 712.50
0.2000 org Pekerja @ Rp. 35,000.00 7,000.00
0.0100 org Mandor @ Rp. 47,500.00 475.00
JUMLAH ( BELUM PPN ) 14,937.50
JASA 10 %
JUMLAH

Analisa Gedung - 73
No. Macam Pekerjaan Upah
(1) (2) (3)
DIBULATKAN

SNI 1.0000 m2 Plesteran 1 Pc : 4 Ps, tebal 15 mm


6.4 5.2000 kg PC @ Rp. 1,196.00
03-2837-2002 0.0200 m3 Pasir pasang @ Rp. 145,000.00
0.1500 org Tukang batu @ Rp. 45,000.00 6,750.00
0.0150 org Kepala tukang batu @ Rp. 47,500.00 712.50
0.2000 org Pekerja @ Rp. 35,000.00 7,000.00
0.0100 org Mandor @ Rp. 47,500.00 475.00
JUMLAH ( BELUM PPN ) 14,937.50
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 74
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m2 Plesteran beton 1 Pc : 3 Ps, tebal 15 mm


6.30 7.0700 kg PC @ Rp. 1,196.00
03-2837-2002 0.0210 m3 Pasir pasang @ Rp. 145,000.00
0.2000 org Tukang batu @ Rp. 45,000.00 9,000.00
0.0200 org Kepala tukang batu @ Rp. 47,500.00 950.00
0.2600 org Pekerja @ Rp. 35,000.00 9,100.00
0.0130 org Mandor @ Rp. 47,500.00 617.50
JUMLAH ( BELUM PPN ) 19,667.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m1 Plesteran skoneng 1 Pc : 2 Ps ( untuk gedung )


6.31 0.5000 kg PC @ Rp. 1,196.00
03-2837-2002 0.0020 m3 Pasir pasang @ Rp. 145,000.00
0.0380 org Tukang batu @ Rp. 45,000.00 1,710.00
0.0380 org Kepala tukang batu @ Rp. 47,500.00 1,805.00
0.0570 org Pekerja @ Rp. 35,000.00 1,995.00
0.0020 org Mandor @ Rp. 47,500.00 95.00
JUMLAH ( BELUM PPN ) 5,605.00
JASA 10 %
JUMLAH
DIBULATKAN

G.50.b 1.0000 m1 Sponengan (untuk saluran dan sejenisnya)


0.3600 kg PC @ Rp. 1,196.00
0.0009 m3 Pasir pasang @ Rp. 145,000.00
0.0300 org Tukang batu @ Rp. 45,000.00 1,350.00
0.0030 org Kep. Tk. Batu @ Rp. 47,500.00 142.50
0.0900 org Pekerja @ Rp. 35,000.00 3,150.00
0.0045 org Mandor @ Rp. 47,500.00 213.75
JUMLAH ( BELUM PPN ) 4,856.25
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Plesteran siar adukan 1 Pc : 2 Ps


6.35 4.3200 kg PC @ Rp. 1,196.00
03-2837-2002 0.0160 m3 Pasir pasang @ Rp. 145,000.00
0.0700 org Tukang batu @ Rp. 45,000.00 3,150.00
0.0070 org Kepala tukang batu @ Rp. 47,500.00 332.50
0.1500 org Pekerja @ Rp. 35,000.00 5,250.00
0.0080 org Mandor @ Rp. 47,500.00 380.00
JUMLAH ( BELUM PPN ) 9,112.50
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 75
No. Macam Pekerjaan Upah
(1) (2) (3)
SNI 1.0000 m2 Plesteran Ciprat, 1 Pc : 2 Ps
6.34 4.3200 kg PC @ Rp. 1,196.00
0.0160 m3 Pasir pasang @ Rp. 75,000.00
0.1000 org Tukang batu @ Rp. 45,000.00 4,500.00
0.0100 org Kepala tukang batu @ Rp. 47,500.00 475.00
0.2500 org Pekerja @ Rp. 35,000.00 8,750.00
0.0150 org Mandor @ Rp. 47,500.00 712.50
JUMLAH ( BELUM PPN ) 14,437.50
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 76
No. Macam Pekerjaan Upah
(1) (2) (3)

Analisa ZAZ 1.0000 m2 Acian dinding bata


3.5000 kg PC @ Rp. 1,196.00
0.0330 org Tukang batu @ Rp. 45,000.00 1,485.00
0.0033 org Kep. Tk. Batu @ Rp. 47,500.00 156.75
0.0700 org Pekerja @ Rp. 35,000.00 2,450.00
0.0035 org Mandor @ Rp. 47,500.00 166.25
JUMLAH ( BELUM PPN ) 4,258.00
JASA 10 %
JUMLAH
DIBULATKAN

1.0000 m2 Plesteran K- 50, tebal 20 mm


11.1200 kg PC @ Rp. 1,196.00
0.0300 m3 Pasir pasang @ Rp. 145,000.00
0.1800 org Tukang batu @ Rp. 45,000.00 8,100.00
0.0180 org Kepala tukang batu @ Rp. 47,500.00 855.00
0.3600 org Pekerja @ Rp. 35,000.00 12,600.00
0.0180 org Mandor @ Rp. 47,500.00 855.00
JUMLAH ( BELUM PPN ) 22,410.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang dinding batu hias tempel


6.74 1.0500 m2 Batu tempel hitam @ Rp. 75,000.00
11.7500 kg PC @ Rp. 1,196.00
0.0350 m3 Pasir pasang @ Rp. 145,000.00
0.3500 org Tukang batu @ Rp. 45,000.00 15,750.00
0.0350 org Kepala tukang batu @ Rp. 47,500.00 1,662.50
0.6500 org Pekerja @ Rp. 35,000.00 22,750.00
0.0300 org Mandor @ Rp. 47,500.00 1,425.00
JUMLAH ( BELUM TERMASUK PPN ) 41,587.50
JASA 10 %
JUMLAH
DIBULATKAN

PEKERJAAN PASANG TEGEL


AK 1.0000 m2 Pasang tegel warna 30/30
1.0000 m2 Tegel warna uk. 30/30 @ Rp. 37,600.00
0.0160 m Kapur pasang
3
@ Rp. 72,500.00
0.0320 m3 Pasir pasang @ Rp. 145,000.00
1.0000 kg Semen warna @ Rp. 7,000.00
0.2500 org Tukang batu @ Rp. 45,000.00 11,250.00
0.0250 org Kep. Tk. Batu @ Rp. 47,500.00 1,187.50
0.5000 org Pekerja @ Rp. 35,000.00 17,500.00
0.0250 org Mandor @ Rp. 47,500.00 1,187.50
JUMLAH ( BELUM PPN ) 31,125.00
JASA 10 %

Analisa Gedung - 77
No. Macam Pekerjaan Upah
(1) (2) (3)
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang tegel abu-abu 30/30


1.0000 m2 Tegel abu-abu uk. 30/30 @ Rp. 28,000.00
0.0160 m Kapur pasang
3
@ Rp. 72,500.00
0.0320 m3 Pasir pasang @ Rp. 145,000.00
1.0000 kg PC @ Rp. 1,196.00
0.2500 org Tukang batu @ Rp. 45,000.00 11,250.00
0.0250 org Kep. Tk. Batu @ Rp. 47,500.00 1,187.50
0.5000 org Pekerja @ Rp. 35,000.00 17,500.00
0.0250 org Mandor @ Rp. 47,500.00 1,187.50
JUMLAH ( BELUM PPN ) 31,125.00
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 78
No. Macam Pekerjaan Upah
(1) (2) (3)

AK 1.0000 m2 Pasang tegel teraso 30/30


1.0000 m2 Tegel teraso uk. 30/30 @ Rp. 32,000.00
0.0160 m Kapur pasang
3
@ Rp. 72,500.00
0.0320 m3 Pasir pasang @ Rp. 145,000.00
1.0000 kg Semen putih @ Rp. 55.00
0.2500 org Tukang batu @ Rp. 45,000.00 11,250.00
0.0250 org Kep. Tk. Batu @ Rp. 47,500.00 1,187.50
0.5000 org Pekerja @ Rp. 35,000.00 17,500.00
0.0250 org Mandor @ Rp. 47,500.00 1,187.50
JUMLAH ( BELUM PPN ) 31,125.00
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang tegel abu-abu 20/20


1.0000 m2 Tegel abu-abu uk. 20/20 @ Rp. 20,000.00
0.0160 m Kapur pasang
3
@ Rp. 72,500.00
0.0320 m3 Pasir pasang @ Rp. 145,000.00
1.0000 kg PC @ Rp. 1,196.00
0.2500 org Tukang batu @ Rp. 45,000.00 11,250.00
0.0250 org Kep. Tk. Batu @ Rp. 47,500.00 1,187.50
0.5000 org Pekerja @ Rp. 35,000.00 17,500.00
0.0250 org Mandor @ Rp. 47,500.00 1,187.50
JUMLAH ( BELUM PPN ) 31,125.00
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang tegel warna 20/20


1.0000 m2 Tegel warna uk. 20/20 @ Rp. 26,000.00
0.0160 m Kapur pasang
3
@ Rp. 72,500.00
0.0320 m3 Pasir pasang @ Rp. 145,000.00
1.0000 kg Semen warna @ Rp. 7,000.00
0.2500 org Tukang batu @ Rp. 45,000.00 11,250.00
0.0250 org Kep. Tk. Batu @ Rp. 47,500.00 1,187.50
0.5000 org Pekerja @ Rp. 35,000.00 17,500.00
0.0250 org Mandor @ Rp. 47,500.00 1,187.50
JUMLAH ( BELUM PPN ) 31,125.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m1 Pasang plint ubin PC abu-abu ukuran 10 x 20 cm


6.16 5.3000 bh Plint ubin 10 x 20 cm @ Rp. 350.00
1.5600 kg PC @ Rp. 1,196.00
0.0030 m3 Pasir pasang @ Rp. 145,000.00
0.0300 org Tukang batu @ Rp. 45,000.00 1,350.00
0.0030 org Kepala tukang batu @ Rp. 47,500.00 142.50

Analisa Gedung - 79
No. Macam Pekerjaan Upah
(1) (2) (3)
0.0600 org Pekerja @ Rp. 35,000.00 2,100.00
0.0030 org Mandor @ Rp. 47,500.00 142.50
JUMLAH ( BELUM TERMASUK PPN ) 3,735.00
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 80
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m1 Pasang plint ubin PC abu-abu ukuran 10 x 30 cm


6.17 3.5300 bh Plint ubin 10 x 30 cm @ Rp. 750.00
1.5600 kg PC @ Rp. 1,196.00
0.0030 m3 Pasir pasang @ Rp. 145,000.00
0.0300 org Tukang batu @ Rp. 45,000.00 1,350.00
0.0030 org Kepala tukang batu @ Rp. 47,500.00 142.50
0.0600 org Pekerja @ Rp. 35,000.00 2,100.00
0.0030 org Mandor @ Rp. 47,500.00 142.50
JUMLAH ( BELUM TERMASUK PPN ) 3,735.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m1 Pasang plint ubin PC warna ukuran 10 x 20 cm


6.19 5.3000 bh Plint ubin pc warna 10 x 20 cm @ Rp. 400.00
1.2000 kg PC @ Rp. 1,196.00
0.0030 m3 Pasir pasang @ Rp. 145,000.00
0.1900 kg Semen warna @ Rp. 7,000.00
0.0300 org Tukang batu @ Rp. 45,000.00 1,350.00
0.0030 org Kepala tukang batu @ Rp. 47,500.00 142.50
0.0600 org Pekerja @ Rp. 35,000.00 2,100.00
0.0030 org Mandor @ Rp. 47,500.00 142.50
JUMLAH ( BELUM TERMASUK PPN ) 3,735.00
JASA 10 %
JUMLAH
DIBULATKAN

6.20 1.0000 m1 Pasang plint ubin PC warna ukuran 10 x 30 cm


3.3300 bh Plint ubin pc warna 10 x 30 cm @ Rp. 825.00
1.6500 kg PC @ Rp. 1,196.00
0.0032 m3 Pasir pasang @ Rp. 145,000.00
0.1000 kg Semen warna @ Rp. 7,000.00
0.0300 oh Tukang batu @ Rp. 45,000.00 1,350.00
0.0030 oh Kepala tukang batu @ Rp. 47,500.00 142.50
0.0600 oh Pekerja @ Rp. 35,000.00 2,100.00
0.0030 oh Mandor @ Rp. 47,500.00 142.50
JUMLAH ( BELUM TERMASUK PPN ) 3,735.00
JASA 10 %
JUMLAH
DIBULATKAN

PEKERJAAN KERAMIK
An. 1.0000 m2 Pasang ubin porselin
G.69.c 1.0000 m2 Tegel porselin @ Rp. 40,500.00
4.6800 kg PC @ Rp. 1,196.00
0.0090 m3 Pasir pasang @ Rp. 145,000.00
1.0000 kg Semen putih @ Rp. 2,200.00
0.5000 org Tukang batu @ Rp. 45,000.00 22,500.00

Analisa Gedung - 81
No. Macam Pekerjaan Upah
(1) (2) (3)
0.0500 org Kep. Tk. Batu @ Rp. 47,500.00 2,375.00
0.2500 org Pekerja @ Rp. 35,000.00 8,750.00
0.0125 org Mandor @ Rp. 47,500.00 593.75
JUMLAH ( BELUM PPN ) 34,218.75
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 82
No. Macam Pekerjaan Upah
(1) (2) (3)

AK 1.0000 m2 Pasang tegel keramik 20/20 dan 30/30


1.0000 m2 Tegel keramik (std) @ Rp. 42,500.00
4.0800 kg PC @ Rp. 1,196.00
0.0090 m3 Pasir pasang @ Rp. 145,000.00
0.6000 kg Semen putih @ Rp. 2,200.00
0.5000 org Tukang batu @ Rp. 45,000.00 22,500.00
0.0500 org Kep. Tk. Batu @ Rp. 47,500.00 2,375.00
0.2500 org Pekerja @ Rp. 35,000.00 8,750.00
0.0125 org Mandor @ Rp. 47,500.00 593.75
JUMLAH ( BELUM PPN ) 34,218.75
JASA 10 %
JUMLAH
DIBULATKAN
AK 1.0000 m2 Pasang tegel keramik 10/20 berglasir
1.0000 m2 Tegel keramik 10/20 @ Rp. 40,250.00
4.0800 kg PC @ Rp. 1,196.00
0.0090 m3 Pasir pasang @ Rp. 145,000.00
0.6000 kg Semen putih @ Rp. 2,200.00
0.5000 org Tukang batu @ Rp. 45,000.00 22,500.00
0.0500 org Kep. Tk. Batu @ Rp. 47,500.00 2,375.00
0.2500 org Pekerja @ Rp. 35,000.00 8,750.00
0.0125 org Mandor @ Rp. 47,500.00 593.75
JUMLAH ( BELUM PPN ) 34,218.75
JASA 10 %
JUMLAH
DIBULATKAN
AK 1.0000 m2 Pasang tegel keramik 20/20 berglasir
1.0000 m2 Tegel keramik 20/20 @ Rp. 40,250.00
4.0800 kg PC @ Rp. 1,196.00
0.0090 m3 Pasir pasang @ Rp. 145,000.00
0.6000 kg Semen putih @ Rp. 2,200.00
0.5000 org Tukang batu @ Rp. 45,000.00 22,500.00
0.0500 org Kep. Tk. Batu @ Rp. 47,500.00 2,375.00
0.2500 org Pekerja @ Rp. 35,000.00 8,750.00
0.0125 org Mandor @ Rp. 47,500.00 593.75
JUMLAH ( BELUM PPN ) 34,218.75
JASA 10 %
JUMLAH
DIBULATKAN
AK 1.0000 m2 Pasang tegel keramik 30/30 berglasir
1.0000 m2 Tegel keramik 30/30 @ Rp. 40,250.00
4.0800 kg PC @ Rp. 1,196.00
0.0090 m3 Pasir pasang @ Rp. 145,000.00
0.6000 kg Semen putih @ Rp. 2,200.00
0.5000 org Tukang batu @ Rp. 45,000.00 22,500.00
0.0500 org Kep. Tk. Batu @ Rp. 47,500.00 2,375.00
0.2500 org Pekerja @ Rp. 35,000.00 8,750.00
0.0125 org Mandor @ Rp. 47,500.00 593.75

Analisa Gedung - 83
No. Macam Pekerjaan Upah
(1) (2) (3)
JUMLAH ( BELUM PPN ) 34,218.75
JASA 10 %
JUMLAH
DIBULATKAN
SNI 1.0000 m1 Pasang plint keramik ukuran 10 x 40 cm
6.24 0.2300 m2 Keramik 40/40 @ Rp. 45,000.00
1.2000 kg PC @ Rp. 1,196.00
0.0030 m3 Pasir pasang @ Rp. 145,000.00
0.1000 kg Semen warna @ Rp. 7,000.00
0.0300 org Tukang batu @ Rp. 45,000.00 1,350.00
0.0030 org Kepala tukang batu @ Rp. 47,500.00 142.50
0.0600 org Pekerja @ Rp. 35,000.00 2,100.00
0.0030 org Mandor @ Rp. 47,500.00 142.50
JUMLAH ( BELUM TERMASUK PPN ) 3,735.00
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 84
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m1 Pasang plint keramik ukuran 10 x 30 cm


6.25 0.1800 m2 Keramik 30/30 @ Rp. 40,250.00
1.6500 kg PC @ Rp. 1,196.00
0.0032 m3 Pasir pasang @ Rp. 145,000.00
0.1000 kg Semen warna @ Rp. 7,000.00
0.0300 org Tukang batu @ Rp. 45,000.00 1,350.00
0.0030 org Kepala tukang batu @ Rp. 47,500.00 142.50
0.0600 org Pekerja @ Rp. 35,000.00 2,100.00
0.0030 org Mandor @ Rp. 47,500.00 142.50
JUMLAH ( BELUM TERMASUK PPN ) 3,735.00
JASA 10 %
JUMLAH
DIBULATKAN

1.0000 m1 Pasang keramik stepnosing granito 5/30


3.6000 bh Stepnosing granito @ Rp. 9,350.00
0.4080 kg PC @ Rp. 1,196.00
0.0009 m3 Pasir @ Rp. 145,000.00
0.0600 kg Semen putih @ Rp. 2,200.00
0.1000 org Tukang batu @ Rp. 45,000.00 4,500.00
0.0100 org Kep. Tk. Batu @ Rp. 47,500.00 475.00
0.0500 org Pekerja @ Rp. 35,000.00 1,750.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 6,843.75
JASA 10 %
JUMLAH
DIBULATKAN

1.0000 m1 Pasang list keramik dinding 5/20


5.0000 bh List keramik dinding motif @ Rp. 7,500.00
0.4080 kg PC @ Rp. 1,196.00
0.0009 m3 Pasir @ Rp. 145,000.00
0.0600 kg Semen putih @ Rp. 2,200.00
0.1000 org Tukang batu @ Rp. 45,000.00 4,500.00
0.0100 org Kep. Tk. Batu @ Rp. 47,500.00 475.00
0.0500 org Pekerja @ Rp. 35,000.00 1,750.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 6,843.75
JASA 10 %
JUMLAH
DIBULATKAN

1.0000 m2 Pasang keramik dinding 20/25


1.0000 m2 Tegel keramik 20/25 @ Rp. 42,500.00
9.3000 kg PC @ Rp. 1,196.00
0.0180 m3 Pasir pasang @ Rp. 145,000.00
1.5000 kg Semen putih @ Rp. 2,200.00
0.6500 org Tukang batu @ Rp. 45,000.00 29,250.00

Analisa Gedung - 85
No. Macam Pekerjaan Upah
(1) (2) (3)
0.0650 org Kep. Tk. Batu @ Rp. 47,500.00 3,087.50
0.3200 org Pekerja @ Rp. 35,000.00 11,200.00
0.0160 org Mandor @ Rp. 47,500.00 760.00
JUMLAH ( BELUM PPN ) 44,297.50
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 86
No. Macam Pekerjaan Upah
(1) (2) (3)

PEKERJAAN CONBLOCK
AK 1.0000 m2 Pasang conblock tipe segi-empat, uni, segi-enam abu-abu 8 cm, K-400
1.0000 m2 Conblock @ Rp. 55,500.00
0.0500 m 3
Pasir urug @ Rp. 75,000.00
0.2500 org Tukang batu @ Rp. 45,000.00 11,250.00
0.0250 org Kep. Tk. Batu @ Rp. 47,500.00 1,187.50
0.5000 org Pekerja @ Rp. 35,000.00 17,500.00
0.0250 org Mandor @ Rp. 47,500.00 1,187.50
JUMLAH ( BELUM PPN ) 31,125.00
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang conblock tipe uni, segi-empat abu-abu 8 cm, K-300


1.0000 m2 Conblock @ Rp. 50,400.00
0.0500 m3 Pasir urug @ Rp. 75,000.00
0.2500 org Tukang batu @ Rp. 45,000.00 11,250.00
0.0250 org Kep. Tk. Batu @ Rp. 47,500.00 1,187.50
0.5000 org Pekerja @ Rp. 35,000.00 17,500.00
0.0250 org Mandor @ Rp. 47,500.00 1,187.50
JUMLAH ( BELUM PPN ) 31,125.00
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang conblock tipe segi-empat abu-abu 6 cm, K-200


1.0000 m2 Conblock @ Rp. 36,450.00
0.0500 m3 Pasir urug @ Rp. 75,000.00
0.2500 org Tukang batu @ Rp. 45,000.00 11,250.00
0.0250 org Kep. Tk. Batu @ Rp. 47,500.00 1,187.50
0.5000 org Pekerja @ Rp. 35,000.00 17,500.00
0.0250 org Mandor @ Rp. 47,500.00 1,187.50
JUMLAH ( BELUM PPN ) 31,125.00
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang conblock tipe segi-empat abu-abu 8 cm, K-200


1.0000 m2 Conblock @ Rp. 44,550.00
0.0500 m3 Pasir urug @ Rp. 75,000.00
0.2500 org Tukang batu @ Rp. 45,000.00 11,250.00
0.0250 org Kep. Tk. Batu @ Rp. 47,500.00 1,187.50
0.5000 org Pekerja @ Rp. 35,000.00 17,500.00
0.0250 org Mandor @ Rp. 47,500.00 1,187.50
JUMLAH ( BELUM PPN ) 31,125.00
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 87
No. Macam Pekerjaan Upah
(1) (2) (3)

AK 1.0000 m2 Pasang conblock tipe segi-enam abu-abu 6 cm, K-200


1.0000 m2 Conblock @ Rp. 36,380.00
0.0500 m 3
Pasir urug @ Rp. 75,000.00
0.2500 org Tukang batu @ Rp. 45,000.00 11,250.00
0.0250 org Kep. Tk. Batu @ Rp. 47,500.00 1,187.50
0.5000 org Pekerja @ Rp. 35,000.00 17,500.00
0.0250 org Mandor @ Rp. 47,500.00 1,187.50
JUMLAH ( BELUM PPN ) 31,125.00
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 88
No. Macam Pekerjaan Upah
(1) (2) (3)

AK 1.0000 m2 Pasang conblock tipe segi-enam abu-abu 8 cm, K-200


1.0000 m2 Conblock @ Rp. 44,540.00
0.0500 m 3
Pasir urug @ Rp. 75,000.00
0.2500 org Tukang batu @ Rp. 45,000.00 11,250.00
0.0250 org Kep. Tk. Batu @ Rp. 47,500.00 1,187.50
0.5000 org Pekerja @ Rp. 35,000.00 17,500.00
0.0250 org Mandor @ Rp. 47,500.00 1,187.50
JUMLAH ( BELUM PPN ) 31,125.00
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang conblock tipe segi-empat, uni, segi-enam rawna 8 cm, K-400
1.0000 m2 Conblock @ Rp. 63,000.00
0.0500 m3 Pasir urug @ Rp. 75,000.00
0.2500 org Tukang batu @ Rp. 45,000.00 11,250.00
0.0250 org Kep. Tk. Batu @ Rp. 47,500.00 1,187.50
0.5000 org Pekerja @ Rp. 35,000.00 17,500.00
0.0250 org Mandor @ Rp. 47,500.00 1,187.50
JUMLAH ( BELUM PPN ) 31,125.00
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang conblock tipe uni, segi-empat warna 8 cm, K-300


1.0000 m2 Conblock @ Rp. 55,000.00
0.0500 m 3
Pasir urug @ Rp. 75,000.00
0.2500 org Tukang batu @ Rp. 45,000.00 11,250.00
0.0250 org Kep. Tk. Batu @ Rp. 47,500.00 1,187.50
0.5000 org Pekerja @ Rp. 35,000.00 17,500.00
0.0250 org Mandor @ Rp. 47,500.00 1,187.50
JUMLAH ( BELUM PPN ) 31,125.00
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang conblock tipe segi-empat warna 6 cm, K-200


1.0000 m2 Conblock @ Rp. 43,500.00
0.0500 m3 Pasir urug @ Rp. 75,000.00
0.2500 org Tukang batu @ Rp. 45,000.00 11,250.00
0.0250 org Kep. Tk. Batu @ Rp. 47,500.00 1,187.50
0.5000 org Pekerja @ Rp. 35,000.00 17,500.00
0.0250 org Mandor @ Rp. 47,500.00 1,187.50
JUMLAH ( BELUM PPN ) 31,125.00
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 89
No. Macam Pekerjaan Upah
(1) (2) (3)
AK 1.0000 m2 Pasang conblock tipe segi-empat warna 8 cm, K-200
1.0000 m2 Conblock @ Rp. 51,000.00
0.0500 m 3
Pasir urug @ Rp. 75,000.00
0.2500 org Tukang batu @ Rp. 45,000.00 11,250.00
0.0250 org Kep. Tk. Batu @ Rp. 47,500.00 1,187.50
0.5000 org Pekerja @ Rp. 35,000.00 17,500.00
0.0250 org Mandor @ Rp. 47,500.00 1,187.50
JUMLAH ( BELUM PPN ) 31,125.00
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 90
No. Macam Pekerjaan Upah
(1) (2) (3)

AK 1.0000 m2 Pasang conblock tipe segi-enam warna 6 cm, K-200


1.0000 m2 Conblock @ Rp. 43,500.00
0.0500 m 3
Pasir urug @ Rp. 75,000.00
0.2500 org Tukang batu @ Rp. 45,000.00 11,250.00
0.0250 org Kep. Tk. Batu @ Rp. 47,500.00 1,187.50
0.5000 org Pekerja @ Rp. 35,000.00 17,500.00
0.0250 org Mandor @ Rp. 47,500.00 1,187.50
JUMLAH ( BELUM PPN ) 31,125.00
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang conblock tipe segi-enam warna 8 cm, K-200


1.0000 m2 Conblock @ Rp. 51,000.00
0.0500 m3 Pasir urug @ Rp. 75,000.00
0.2500 org Tukang batu @ Rp. 45,000.00 11,250.00
0.0250 org Kep. Tk. Batu @ Rp. 47,500.00 1,187.50
0.5000 org Pekerja @ Rp. 35,000.00 17,500.00
0.0250 org Mandor @ Rp. 47,500.00 1,187.50
JUMLAH ( BELUM PPN ) 31,125.00
JASA 10 %
JUMLAH
DIBULATKAN

1.0000 m2 Pasang grassblock bulat tebal 10 cm


1.0000 m2 Grassblock @ Rp. 41,400.00
0.0500 m 3
Pasir urug @ Rp. 75,000.00
0.2500 org Tukang batu @ Rp. 45,000.00 11,250.00
0.0250 org Kep. Tk. Batu @ Rp. 47,500.00 1,187.50
0.5000 org Pekerja @ Rp. 35,000.00 17,500.00
0.0250 org Mandor @ Rp. 47,500.00 1,187.50
JUMLAH ( BELUM PPN ) 31,125.00
JASA 10 %
JUMLAH
DIBULATKAN

1.0000 m2 Pasang grassblock tebal 10 cm


1.0000 m2 Grassblock @ Rp. 41,400.00
0.0500 m3 Pasir urug @ Rp. 75,000.00
0.2500 org Tukang batu @ Rp. 45,000.00 11,250.00
0.0250 org Kep. Tk. Batu @ Rp. 47,500.00 1,187.50
0.5000 org Pekerja @ Rp. 35,000.00 17,500.00
0.0250 org Mandor @ Rp. 47,500.00 1,187.50
JUMLAH ( BELUM PPN ) 31,125.00
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 91
No. Macam Pekerjaan Upah
(1) (2) (3)
AK 3.0000 m3 Bronjong kawat galvanis
A Penganyaman
70.0000 kg Kawat galvanis @ Rp. 7,755.00
2.5000 org Penganyaman @ Rp. 45,000.00
2.0000 org Pekerja @ Rp. 35,000.00
0.0800 org Mandor @ Rp. 47,500.00
B Pengisian
3.0000 m3 Batu kali (hitam) @ Rp. 107,250.00 321,750.00
4.5000 org Pekerja @ Rp. 35,000.00 157,500.00
0.0750 org Mandor @ Rp. 47,500.00 3,562.50
JUMLAH ( BELUM PPN ) 482,812.50
TIAP 1 M3
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 92
No. Macam Pekerjaan Upah
(1) (2) (3)

AK 1.0000 bh Pasang buis beton dia. 80 cm


1.0000 bh Buis beton @ Rp. 40,000.00
0.1250 org Tukang batu @ Rp. 45,000.00 5,625.00
0.0125 org Kep. Tk. Batu @ Rp. 47,500.00 593.75
0.2500 org Pekerja @ Rp. 35,000.00 8,750.00
JUMLAH ( BELUM PPN ) 14,968.75
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m3 Langsiran batu kali


0.2000 org Pekerja @ Rp. 35,000.00 7,000.00
0.0200 org Mandor @ Rp. 47,500.00 950.00
1.0000 hr Sewa gerobag @ Rp. 1,500.00 1,500.00
JUMLAH ( BELUM PPN ) 9,450.00
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m3 Langsiran kerikil


0.1200 org Pekerja @ Rp. 35,000.00 4,200.00
0.0120 org Mandor @ Rp. 47,500.00 570.00
1.0000 hr Sewa gerobag @ Rp. 1,500.00 1,500.00
JUMLAH ( BELUM PPN ) 6,270.00
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m3 Langsiran pasir


0.0500 org Pekerja @ Rp. 35,000.00 1,750.00
0.0050 org Mandor @ Rp. 47,500.00 237.50
1.0000 hr Sewa gerobag @ Rp. 1,500.00 1,500.00
JUMLAH ( BELUM PPN ) 3,487.50
JASA 10 %
JUMLAH
DIBULATKAN

PEKERJAAN KAYU
SNI 1.0000 m3 Pasang konstruksi kuda-kuda kayu jati
6.27 1.1000 m3 Kayu jati balok @ Rp. 20,000,000.00
03-3434-2002 15.0000 kg Besi strip @ Rp. 11,500.00
0.8000 kg Paku biasa 2" - 5" @ Rp. 8,000.00
12.0000 org Tukang kayu @ Rp. 47,500.00 570,000.00
1.2000 org Kepala tukang kayu @ Rp. 50,000.00 60,000.00
4.0000 org Pekerja @ Rp. 35,000.00 140,000.00
0.2000 org Mandor @ Rp. 47,500.00 9,500.00
JUMLAH ( BELUM PPN ) 779,500.00
JASA 10 %
JUMLAH

Analisa Gedung - 93
No. Macam Pekerjaan Upah
(1) (2) (3)
DIBULATKAN

SNI 1.0000 m3 Membuat kuda-kuda kayu jati (lokal)


6.27 1.1000 m3 Kayu jati (lokal) @ Rp. 16,500,000.00
03-3434-2002 15.0000 kg Besi strip @ Rp. 11,500.00
0.8000 kg Paku biasa 2" - 5" @ Rp. 8,000.00
12.0000 org Tukang kayu @ Rp. 47,500.00 570,000.00
1.2000 org Kepala tukang kayu @ Rp. 50,000.00 60,000.00
4.0000 org Pekerja @ Rp. 35,000.00 140,000.00
0.2000 org Mandor @ Rp. 47,500.00 9,500.00
JUMLAH ( BELUM PPN ) 779,500.00
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 94
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m3 Membuat kuda-kuda kayu kamper


6.28 1.1000 m3 Kayu kamper @ Rp. 9,250,000.00
03-3434-2002 15.0000 kg Besi strip @ Rp. 11,500.00
0.8000 kg Paku biasa 2" - 5" @ Rp. 8,000.00
12.0000 org Tukang kayu @ Rp. 47,500.00 570,000.00
1.2000 org Kepala tukang kayu @ Rp. 50,000.00 60,000.00
4.0000 org Pekerja @ Rp. 35,000.00 140,000.00
0.2000 org Mandor @ Rp. 47,500.00 9,500.00
JUMLAH ( BELUM PPN ) 779,500.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m3 Membuat kuda-kuda kayu kruing


6.30 1.1000 m3 Kayu kruing @ Rp. 4,350,000.00
03-3434-2002 15.0000 kg Besi strip @ Rp. 11,500.00
0.8000 kg Paku biasa 2" - 5" @ Rp. 8,000.00
12.0000 org Tukang kayu @ Rp. 47,500.00 570,000.00
1.2000 org Kepala tukang kayu @ Rp. 50,000.00 60,000.00
4.0000 org Pekerja @ Rp. 35,000.00 140,000.00
0.2000 org Mandor @ Rp. 47,500.00 9,500.00
JUMLAH ( BELUM PPN ) 779,500.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m3 Membuat kuda-kuda kayu bengkirai


1.1000 m3 Kayu bengkirai @ Rp. 7,800,000.00
03-3434-2002 15.0000 kg Besi strip @ Rp. 11,500.00
0.8000 kg Paku biasa 2" - 5" @ Rp. 8,000.00
12.0000 org Tukang kayu @ Rp. 47,500.00 570,000.00
1.2000 org Kepala tukang kayu @ Rp. 50,000.00 60,000.00
4.0000 org Pekerja @ Rp. 35,000.00 140,000.00
0.2000 org Mandor @ Rp. 47,500.00 9,500.00
JUMLAH ( BELUM PPN ) 779,500.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m3 Membuat kuda-kuda kayu glugu


1.1000 m3 Kayu glugu @ Rp. 1,458,000.00
03-3434-2002 15.0000 kg Besi strip @ Rp. 11,500.00
0.8000 kg Paku biasa 2" - 5" @ Rp. 8,000.00
12.0000 org Tukang kayu @ Rp. 47,500.00 570,000.00
1.2000 org Kepala tukang kayu @ Rp. 50,000.00 60,000.00
4.0000 org Pekerja @ Rp. 35,000.00 140,000.00
0.2000 org Mandor @ Rp. 47,500.00 9,500.00
JUMLAH ( BELUM PPN ) 779,500.00
JASA 10 %

Analisa Gedung - 95
No. Macam Pekerjaan Upah
(1) (2) (3)
JUMLAH
DIBULATKAN

F.16 1.0000 m2 Pasang usuk 5/7, reng 2/3 kayu jati


2.2000 m1 Usuk kayu jati 5/7 @ Rp. 70,000.00
5.0000 m 1
Reng jati 2/3 @ Rp. 12,000.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 96
No. Macam Pekerjaan Upah
(1) (2) (3)

AK 1.0000 m2 Pasang usuk 5/7 kayu jati, reng 2/3 kayu jati (lokal)
2.2000 m1 Usuk kayu jati 5/7 @ Rp. 70,000.00
5.0000 m 1
Reng kayu jati 2/3 (lokal) @ Rp. 9,900.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang usuk 5/7 kayu jati, reng 2/3 kayu kamper
2.2000 m1 Usuk kayu jati 5/7 @ Rp. 70,000.00
5.0000 m1 Reng kayu kamper 2/3 @ Rp. 5,550.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang usuk 5/7 kayu jati, reng 2/3 kayu kruing
2.2000 m1 Usuk kayu jati 5/7 @ Rp. 70,000.00
5.0000 m1 Reng kayu kruing 2/3 @ Rp. 2,610.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang usuk 5/7 kayu jati, reng 2/3 kayu bengkirai
2.2000 m1 Usuk kayu jati 5/7 @ Rp. 70,000.00
5.0000 m 1
Reng kayu bengkirai 2/3 @ Rp. 4,680.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00

Analisa Gedung - 97
No. Macam Pekerjaan Upah
(1) (2) (3)
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 98
No. Macam Pekerjaan Upah
(1) (2) (3)

AK 1.0000 m2 Pasang usuk 5/7 kayu jati lokal, reng 2/3 kayu jati
2.2000 m1 Usuk kayu jati 5/7 (lokal) @ Rp. 57,750.00
5.0000 m 1
Reng kayu jati 2/3 @ Rp. 12,000.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang usuk 5/7 kayu jati lokal, reng 2/3 kayu jati lokal
2.2000 m1 Usuk kayu jati 5/7 (lokal) @ Rp. 57,750.00
5.0000 m1 Reng kayu jati 2/3 lokal @ Rp. 9,900.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang usuk 5/7 kayu jati lokal, reng 2/3 kayu kamper
2.2000 m1 Usuk kayu jati 5/7 (lokal) @ Rp. 57,750.00
5.0000 m1 Reng kayu kamper 2/3 @ Rp. 5,550.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang usuk 5/7 kayu jati lokal, reng 2/3 kayu kruing
2.2000 m1 Usuk kayu jati 5/7 (lokal) @ Rp. 57,750.00
5.0000 m 1
Reng kayu kruing 2/3 @ Rp. 2,610.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00

Analisa Gedung - 99
No. Macam Pekerjaan Upah
(1) (2) (3)
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 100


No. Macam Pekerjaan Upah
(1) (2) (3)

AK 1.0000 m2 Pasang usuk 5/7 kayu jati lokal, reng 2/3 kayu bengkirai
2.2000 m1 Usuk kayu jati 5/7 (lokal) @ Rp. 57,750.00
5.0000 m 1
Reng kayu bengkirai 2/3 @ Rp. 4,680.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang usuk 5/7 kayu kamper, reng 2/3 reng kayu jati
2.2000 m1 Usuk kayu kamper 5/7 @ Rp. 32,375.00
5.0000 m1 Reng jati 2/3 @ Rp. 12,000.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang usuk 5/7 kayu kamper, reng 2/3 kayu jati lokal
2.2000 m1 Usuk kayu kamper 5/7 @ Rp. 32,375.00
5.0000 m1 Reng kayu jati 2/3 lokal @ Rp. 9,900.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang usuk 5/7 kayu kamper, reng 2/3 kayu kamper
2.2000 m1 Usuk kayu kamper 5/7 @ Rp. 32,375.00
5.0000 m 1
Reng kayu kamper 2/3 @ Rp. 5,550.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00

Analisa Gedung - 101


No. Macam Pekerjaan Upah
(1) (2) (3)
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 102


No. Macam Pekerjaan Upah
(1) (2) (3)

AK 1.0000 m2 Pasang usuk 5/7 kayu kamper, reng 2/3 kayu kruing
2.2000 m1 Usuk kayu kamper 5/7 @ Rp. 32,375.00
5.0000 m 1
Reng kayu kruing 2/3 @ Rp. 2,610.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang usuk 5/7 kayu kamper, reng 2/3 kayu bengkirai
2.2000 m1 Usuk kayu kamper 5/7 @ Rp. 32,375.00
5.0000 m1 Reng kayu bengkirai 2/3 @ Rp. 4,680.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang usuk 5/7 kayu kruing, reng 2/3 kayu jati
2.2000 m1 Usuk kayu kruing 5/7 @ Rp. 15,225.00
5.0000 m1 Reng jati 2/3 @ Rp. 12,000.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang usuk 5/7 kayu kruing, reng 2/3 kayu jati lokal
2.2000 m1 Usuk kayu kruing 5/7 @ Rp. 15,225.00
5.0000 m 1
Reng kayu jati 2/3 lokal @ Rp. 9,900.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00

Analisa Gedung - 103


No. Macam Pekerjaan Upah
(1) (2) (3)
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 104


No. Macam Pekerjaan Upah
(1) (2) (3)

AK 1.0000 m2 Pasang usuk 5/7 kayu kruing, reng 2/3 kayu kamper
2.2000 m1 Usuk kayu kruing 5/7 @ Rp. 15,225.00
5.0000 m 1
Reng kayu kamper 2/3 @ Rp. 5,550.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang usuk 5/7 kayu kruing, reng 2/3 kayu kruing
2.2000 m1 Usuk kayu kruing 5/7 @ Rp. 15,225.00
5.0000 m1 Reng kayu kruing 2/3 @ Rp. 2,610.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang usuk 5/7 kayu kruing, reng 2/3 kayu bengkirai
2.2000 m1 Usuk kayu kruing 5/7 @ Rp. 15,225.00
5.0000 m1 Reng kayu bengkirai 2/3 @ Rp. 4,680.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang usuk 5/7 kayu bengkirai, reng 2/3 kayu jati
2.2000 m1 Usuk kayu bengkirai 5/7 @ Rp. 27,300.00
5.0000 m 1
Reng jati 2/3 @ Rp. 12,000.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00

Analisa Gedung - 105


No. Macam Pekerjaan Upah
(1) (2) (3)
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 106


No. Macam Pekerjaan Upah
(1) (2) (3)

AK 1.0000 m2 Pasang usuk 5/7 kayu bengkirai, reng 2/3 kayu jati lokal
2.2000 m1 Usuk kayu bengkirai 5/7 @ Rp. 27,300.00
5.0000 m 1
Reng kayu jati 2/3 lokal @ Rp. 9,900.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang usuk 5/7 kayu bengkirai, reng 2/3 kayu kamper
2.2000 m1 Usuk kayu bengkirai 5/7 @ Rp. 27,300.00
5.0000 m1 Reng kayu kamper 2/3 @ Rp. 5,550.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang usuk 5/7 kayu bengkirai, reng 2/3 kayu kruing
2.2000 m1 Usuk kayu bengkirai 5/7 @ Rp. 27,300.00
5.0000 m1 Reng kayu kruing 2/3 @ Rp. 2,610.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang usuk 5/7 kayu bengkirai, reng 2/3 kayu bengkirai
2.2000 m1 Usuk kayu bengkirai 5/7 @ Rp. 27,300.00
5.0000 m 1
Reng kayu bengkirai 2/3 @ Rp. 4,680.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00

Analisa Gedung - 107


No. Macam Pekerjaan Upah
(1) (2) (3)
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 108


No. Macam Pekerjaan Upah
(1) (2) (3)

AK 1.0000 m2 Pasang usuk 5/7 glugu, reng 2/3 kayu jati


2.2000 m1 Usuk glugu 5/7 @ Rp. 6,300.00
5.0000 m 1
Reng jati 2/3 @ Rp. 12,000.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang usuk 5/7 glugu, reng 2/3 kayu jati lokal
2.2000 m1 Usuk glugu 5/7 @ Rp. 6,300.00
5.0000 m1 Reng kayu jati 2/3 lokal @ Rp. 9,900.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang usuk 5/7 glugu, reng 2/3 kayu kamper


2.2000 m1 Usuk glugu 5/7 @ Rp. 6,300.00
5.0000 m1 Reng kayu kamper 2/3 @ Rp. 5,550.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang usuk 5/7 glugu, reng 2/3 kayu kruing


2.2000 m1 Usuk glugu 5/7 @ Rp. 6,300.00
5.0000 m 1
Reng kayu kruing 2/3 @ Rp. 2,610.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00

Analisa Gedung - 109


No. Macam Pekerjaan Upah
(1) (2) (3)
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 110


No. Macam Pekerjaan Upah
(1) (2) (3)

AK 1.0000 m2 Pasang usuk 5/7 glugu, reng 2/3 kayu bengkirai


2.2000 m1 Usuk glugu 5/7 @ Rp. 6,300.00
5.0000 m 1
Reng kayu bengkirai 2/3 @ Rp. 4,680.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

F.16 1.0000 m2 Pasang usuk 5/7, reng 3/4 kayu jati


2.2000 m1 Usuk kayu jati 5/7 @ Rp. 70,000.00
4.0000 m1 Reng jati 3/4 @ Rp. 24,000.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang usuk 5/7 kayu jati, reng 3/4 kayu jati (lokal)
2.2000 m1 Usuk kayu jati 5/7 @ Rp. 70,000.00
4.0000 m1 Reng kayu jati 3/4 (lokal) @ Rp. 19,800.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang usuk 5/7 kayu jati, reng 3/4 kayu kamper
2.2000 m1 Usuk kayu jati 5/7 @ Rp. 70,000.00
4.0000 m 1
Reng kayu kamper 3/4 @ Rp. 11,100.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00

Analisa Gedung - 111


No. Macam Pekerjaan Upah
(1) (2) (3)
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 112


No. Macam Pekerjaan Upah
(1) (2) (3)

AK 1.0000 m2 Pasang usuk 5/7 kayu jati, reng 3/4 kayu kruing
2.2000 m1 Usuk kayu jati 5/7 @ Rp. 70,000.00
4.0000 m 1
Reng kayu kruing 3/4 @ Rp. 5,220.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang usuk 5/7 kayu jati, reng 3/4 kayu bengkirai
2.2000 m1 Usuk kayu jati 5/7 @ Rp. 70,000.00
4.0000 m1 Reng kayu bengkirai 3/4 @ Rp. 9,360.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang usuk 5/7 kayu jati lokal, reng 3/4 kayu jati
2.2000 m1 Usuk kayu jati 5/7 (lokal) @ Rp. 57,750.00
4.0000 m1 Reng kayu jati 3/4 @ Rp. 24,000.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang usuk 5/7 kayu jati lokal, reng 3/4 kayu jati lokal
2.2000 m1 Usuk kayu jati 5/7 (lokal) @ Rp. 57,750.00
4.0000 m 1
Reng kayu jati 3/4 lokal @ Rp. 19,800.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00

Analisa Gedung - 113


No. Macam Pekerjaan Upah
(1) (2) (3)
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 114


No. Macam Pekerjaan Upah
(1) (2) (3)

AK 1.0000 m2 Pasang usuk 5/7 kayu jati lokal, reng 3/4 kayu kamper
2.2000 m1 Usuk kayu jati 5/7 (lokal) @ Rp. 57,750.00
4.0000 m 1
Reng kayu kamper 3/4 @ Rp. 11,100.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang usuk 5/7 kayu jati lokal, reng 3/4 kayu kruing
2.2000 m1 Usuk kayu jati 5/7 (lokal) @ Rp. 57,750.00
4.0000 m1 Reng kayu kruing 3/4 @ Rp. 5,220.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang usuk 5/7 kayu jati lokal, reng 3/4 kayu bengkirai
2.2000 m1 Usuk kayu jati 5/7 (lokal) @ Rp. 57,750.00
4.0000 m1 Reng kayu bengkirai 3/4 @ Rp. 9,360.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang usuk 5/7 kayu kamper, reng 3/4 reng kayu jati
2.2000 m1 Usuk kayu kamper 5/7 @ Rp. 32,375.00
4.0000 m 1
Reng jati 3/4 @ Rp. 24,000.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00

Analisa Gedung - 115


No. Macam Pekerjaan Upah
(1) (2) (3)
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 116


No. Macam Pekerjaan Upah
(1) (2) (3)

AK 1.0000 m2 Pasang usuk 5/7 kayu kamper, reng 3/4 kayu jati lokal
2.2000 m1 Usuk kayu kamper 5/7 @ Rp. 32,375.00
4.0000 m 1
Reng kayu jati 3/4 lokal @ Rp. 19,800.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang usuk 5/7 kayu kamper, reng 3/4 kayu kamper
2.2000 m1 Usuk kayu kamper 5/7 @ Rp. 32,375.00
4.0000 m1 Reng kayu kamper 3/4 @ Rp. 11,100.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang usuk 5/7 kayu kamper, reng 3/4 kayu kruing
2.2000 m1 Usuk kayu kamper 5/7 @ Rp. 32,375.00
4.0000 m1 Reng kayu kruing 3/4 @ Rp. 5,220.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang usuk 5/7 kayu kamper, reng 3/4 kayu bengkirai
2.2000 m1 Usuk kayu kamper 5/7 @ Rp. 32,375.00
4.0000 m 1
Reng kayu bengkirai 3/4 @ Rp. 9,360.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00

Analisa Gedung - 117


No. Macam Pekerjaan Upah
(1) (2) (3)
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 118


No. Macam Pekerjaan Upah
(1) (2) (3)

AK 1.0000 m2 Pasang usuk 5/7 kayu kruing, reng 3/4 kayu jati
2.2000 m1 Usuk kayu kruing 5/7 @ Rp. 15,225.00
4.0000 m 1
Reng jati 3/4 @ Rp. 24,000.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang usuk 5/7 kayu kruing, reng 3/4 kayu jati lokal
2.2000 m1 Usuk kayu kruing 5/7 @ Rp. 15,225.00
4.0000 m1 Reng kayu jati 3/4 lokal @ Rp. 19,800.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang usuk 5/7 kayu kruing, reng 3/4 kayu kamper
2.2000 m1 Usuk kayu kruing 5/7 @ Rp. 15,225.00
4.0000 m1 Reng kayu kamper 3/4 @ Rp. 11,100.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang usuk 5/7 kayu kruing, reng 3/4 kayu kruing
2.2000 m1 Usuk kayu kruing 5/7 @ Rp. 15,225.00
4.0000 m 1
Reng kayu kruing 3/4 @ Rp. 5,220.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00

Analisa Gedung - 119


No. Macam Pekerjaan Upah
(1) (2) (3)
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 120


No. Macam Pekerjaan Upah
(1) (2) (3)

AK 1.0000 m2 Pasang usuk 5/7 kayu kruing, reng 3/4 kayu bengkirai
2.2000 m1 Usuk kayu kruing 5/7 @ Rp. 15,225.00
4.0000 m 1
Reng kayu bengkirai 3/4 @ Rp. 9,360.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang usuk 5/7 kayu bengkirai, reng 3/4 kayu jati
2.2000 m1 Usuk kayu bengkirai 5/7 @ Rp. 27,300.00
4.0000 m1 Reng jati 3/4 @ Rp. 24,000.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang usuk 5/7 kayu bengkirai, reng 3/4 kayu jati lokal
2.2000 m1 Usuk kayu bengkirai 5/7 @ Rp. 27,300.00
4.0000 m1 Reng kayu jati 3/4 lokal @ Rp. 19,800.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang usuk 5/7 kayu bengkirai, reng 3/4 kayu kamper
2.2000 m1 Usuk kayu bengkirai 5/7 @ Rp. 27,300.00
4.0000 m 1
Reng kayu kamper 3/4 @ Rp. 11,100.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00

Analisa Gedung - 121


No. Macam Pekerjaan Upah
(1) (2) (3)
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 122


No. Macam Pekerjaan Upah
(1) (2) (3)

AK 1.0000 m2 Pasang usuk 5/7 kayu bengkirai, reng 3/4 kayu kruing
2.2000 m1 Usuk kayu bengkirai 5/7 @ Rp. 27,300.00
4.0000 m 1
Reng kayu kruing 3/4 @ Rp. 5,220.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang usuk 5/7 kayu bengkirai, reng 3/4 kayu bengkirai
2.2000 m1 Usuk kayu bengkirai 5/7 @ Rp. 27,300.00
4.0000 m1 Reng kayu bengkirai 3/4 @ Rp. 9,360.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang usuk 5/7 glugu, reng 3/4 kayu jati


2.2000 m1 Usuk glugu 5/7 @ Rp. 6,300.00
4.0000 m1 Reng jati 3/4 @ Rp. 24,000.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang usuk 5/7 glugu, reng 3/4 kayu jati lokal
2.2000 m1 Usuk glugu 5/7 @ Rp. 6,300.00
4.0000 m 1
Reng kayu jati 3/4 lokal @ Rp. 19,800.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00

Analisa Gedung - 123


No. Macam Pekerjaan Upah
(1) (2) (3)
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 124


No. Macam Pekerjaan Upah
(1) (2) (3)

AK 1.0000 m2 Pasang usuk 5/7 glugu, reng 3/4 kayu kamper


2.2000 m1 Usuk glugu 5/7 @ Rp. 6,300.00
4.0000 m 1
Reng kayu kamper 3/4 @ Rp. 11,100.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang usuk 5/7 glugu, reng 3/4 kayu kruing


2.2000 m1 Usuk glugu 5/7 @ Rp. 6,300.00
4.0000 m1 Reng kayu kruing 3/4 @ Rp. 5,220.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang usuk 5/7 glugu, reng 3/4 kayu bengkirai


2.2000 m1 Usuk glugu 5/7 @ Rp. 6,300.00
4.0000 m1 Reng kayu bengkirai 3/4 @ Rp. 9,360.00
0.1500 kg Paku usuk @ Rp. 9,000.00
0.1000 kg Paku reng @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kep. Tk. Kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 8,868.75
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m3 Membuat kusen pintu / jendela kayu jati (klas plitur)
6.1 1.1000 m3 Kayu jati (klas plitur) @ Rp. 20,000,000.00
03-3434-2002 20.0000 org Tukang kayu @ Rp. 47,500.00 950,000.00
2.0000 org Kepala tukang kayu @ Rp. 50,000.00 100,000.00
6.0000 org Pekerja @ Rp. 35,000.00 210,000.00
0.3000 org Mandor @ Rp. 47,500.00 14,250.00

Analisa Gedung - 125


No. Macam Pekerjaan Upah
(1) (2) (3)
JUMLAH ( BELUM PPN ) 1,274,250.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m3 Membuat kusen pintu / jendela kayu jati (lokal)


6.1 1.1000 m3 Kayu jati (lokal) @ Rp. 16,500,000.00
03-3434-2002 20.0000 org Tukang kayu @ Rp. 47,500.00 950,000.00
2.0000 org Kepala tukang kayu @ Rp. 50,000.00 100,000.00
6.0000 org Pekerja @ Rp. 35,000.00 210,000.00
0.3000 org Mandor @ Rp. 47,500.00 14,250.00
JUMLAH ( BELUM PPN ) 1,274,250.00
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 126


No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m3 Membuat kusen pintu / jendela kayu kamper


6.2 1.2000 m3 Kayu kamper @ Rp. 9,250,000.00
03-3434-2002 18.0000 org Tukang kayu @ Rp. 47,500.00 855,000.00
2.0000 org Kepala tukang kayu @ Rp. 50,000.00 100,000.00
6.0000 org Pekerja @ Rp. 35,000.00 210,000.00
0.3000 org Mandor @ Rp. 47,500.00 14,250.00
JUMLAH ( BELUM PPN ) 1,179,250.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m3 Membuat kusen pintu / jendela kayu kruing


1.2000 m3 Kayu kruing @ Rp. 4,350,000.00
03-3434-2002 18.0000 org Tukang kayu @ Rp. 47,500.00 855,000.00
2.0000 org Kepala tukang kayu @ Rp. 50,000.00 100,000.00
6.0000 org Pekerja @ Rp. 35,000.00 210,000.00
0.3000 org Mandor @ Rp. 47,500.00 14,250.00
JUMLAH ( BELUM PPN ) 1,179,250.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m3 Membuat kusen pintu / jendela kayu bengkirai


1.2000 m3 Kayu bengkirai @ Rp. 7,800,000.00
03-3434-2002 18.0000 org Tukang kayu @ Rp. 47,500.00 855,000.00
2.0000 org Kepala tukang kayu @ Rp. 50,000.00 100,000.00
6.0000 org Pekerja @ Rp. 35,000.00 210,000.00
0.3000 org Mandor @ Rp. 47,500.00 14,250.00
JUMLAH ( BELUM PPN ) 1,179,250.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang pintu teakwood rangkap, rangka kayu jati


6.19 0.0196 m3 Papan kayu jati @ Rp. 22,000,000.00
03-3434-2002 0.0300 kg Paku biasa 1/2" - 1" @ Rp. 9,000.00
0.3000 kg Lem kayu @ Rp. 11,000.00
1.0000 lbr Teakwood 4' x 8' x 4 mm @ Rp. 69,500.00
2.0000 org Tukang kayu @ Rp. 47,500.00 95,000.00
0.2000 org Kepala tukang kayu @ Rp. 50,000.00 10,000.00
0.6000 org Pekerja @ Rp. 35,000.00 21,000.00
0.0300 org Mandor @ Rp. 47,500.00 1,425.00
JUMLAH ( BELUM PPN ) 127,425.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang pintu teakwood rangkap, rangka kayu jati lokal

Analisa Gedung - 127


No. Macam Pekerjaan Upah
(1) (2) (3)
6.19 0.0196 m3 Papan kayu jati lokal @ Rp. 18,700,000.00
03-3434-2002 0.0300 kg Paku biasa 1/2" - 1" @ Rp. 9,000.00
0.3000 kg Lem kayu @ Rp. 11,000.00
1.0000 lbr Teakwood 4' x 8' x 4 mm @ Rp. 69,500.00
2.0000 org Tukang kayu @ Rp. 47,500.00 95,000.00
0.2000 org Kepala tukang kayu @ Rp. 50,000.00 10,000.00
0.6000 org Pekerja @ Rp. 35,000.00 21,000.00
0.0300 org Mandor @ Rp. 47,500.00 1,425.00
JUMLAH ( BELUM PPN ) 127,425.00
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 128


No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m2 Pasang pintu teakwood rangkap, rangka kayu kamper


6.20 0.0196 m3 Papan kayu kamper @ Rp. 8,000,000.00
03-3434-2002 0.0300 kg Paku biasa 1/2" - 1" @ Rp. 9,000.00
0.3000 kg Lem kayu @ Rp. 11,000.00
1.0000 lbr Teakwood 4' x 8' x 4 mm @ Rp. 69,500.00
2.0000 org Tukang kayu @ Rp. 47,500.00 95,000.00
0.2000 org Kepala tukang kayu @ Rp. 50,000.00 10,000.00
0.6000 org Pekerja @ Rp. 35,000.00 21,000.00
0.0300 org Mandor @ Rp. 47,500.00 1,425.00
JUMLAH ( BELUM PPN ) 127,425.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang pintu teakwood rangkap, rangka kayu kruing


0.0196 m3 Papan kayu kruing @ Rp. 4,750,000.00
03-3434-2002 0.0300 kg Paku biasa 1/2" - 1" @ Rp. 9,000.00
0.3000 kg Lem kayu @ Rp. 11,000.00
1.0000 lbr Teakwood 4' x 8' x 4 mm @ Rp. 69,500.00
2.0000 org Tukang kayu @ Rp. 47,500.00 95,000.00
0.2000 org Kepala tukang kayu @ Rp. 50,000.00 10,000.00
0.6000 org Pekerja @ Rp. 35,000.00 21,000.00
0.0300 org Mandor @ Rp. 47,500.00 1,425.00
JUMLAH ( BELUM PPN ) 127,425.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang pintu teakwood rangkap, rangka kayu bengkirai


0.0196 m3 Papan kayu bengkirai @ Rp. 8,200,000.00
03-3434-2002 0.0300 kg Paku biasa 1/2" - 1" @ Rp. 9,000.00
0.3000 kg Lem kayu @ Rp. 11,000.00
1.0000 lbr Teakwood 4' x 8' x 4 mm @ Rp. 69,500.00
2.0000 org Tukang kayu @ Rp. 47,500.00 95,000.00
0.2000 org Kepala tukang kayu @ Rp. 50,000.00 10,000.00
0.6000 org Pekerja @ Rp. 35,000.00 21,000.00
0.0300 org Mandor @ Rp. 47,500.00 1,425.00
JUMLAH ( BELUM PPN ) 127,425.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang pintu dan jendela kaca kayu jati


6.9 0.0350 m3 Kayu jati papan @ Rp. 22,000,000.00
03-3434-2002 2.0000 org Tukang kayu @ Rp. 47,500.00 95,000.00
0.2000 org Kepala tukang kayu @ Rp. 50,000.00 10,000.00
0.8000 org Pekerja @ Rp. 35,000.00 28,000.00
0.0400 org Mandor @ Rp. 47,500.00 1,900.00
JUMLAH ( BELUM PPN ) 134,900.00

Analisa Gedung - 129


No. Macam Pekerjaan Upah
(1) (2) (3)
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang pintu dan jendela kaca kayu jati lokal
6.9 0.0350 m3 Papan kayu jati lokal @ Rp. 18,700,000.00
03-3434-2002 2.0000 org Tukang kayu @ Rp. 47,500.00 95,000.00
0.2000 org Kepala tukang kayu @ Rp. 50,000.00 10,000.00
0.8000 org Pekerja @ Rp. 35,000.00 28,000.00
0.0400 org Mandor @ Rp. 47,500.00 1,900.00
JUMLAH ( BELUM PPN ) 134,900.00
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 130


No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m2 Pasang pintu dan jendela kaca kayu kamper


610 0.0350 m3 Papan kayu kamper @ Rp. 8,000,000.00
03-3434-2002 2.0000 org Tukang kayu @ Rp. 47,500.00 95,000.00
0.2000 org Kep. Tk. Kayu @ Rp. 50,000.00 10,000.00
0.8000 org Pekerja @ Rp. 35,000.00 28,000.00
0.0400 org Mandor @ Rp. 47,500.00 1,900.00
JUMLAH ( BELUM PPN ) 134,900.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang pintu dan jendela kaca kayu kruing


0.0350 m3 Papan kayu kruing @ Rp. 4,750,000.00
03-3434-2002 2.0000 org Tukang kayu @ Rp. 47,500.00 95,000.00
0.2000 org Kep. Tk. Kayu @ Rp. 50,000.00 10,000.00
0.8000 org Pekerja @ Rp. 35,000.00 28,000.00
0.0400 org Mandor @ Rp. 47,500.00 1,900.00
JUMLAH ( BELUM PPN ) 134,900.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang pintu dan jendela kaca kayu bengkirai


0.0350 m3 Papan kayu bengkirai @ Rp. 8,200,000.00
03-3434-2002 2.0000 org Tukang kayu @ Rp. 47,500.00 95,000.00
0.2000 org Kep. Tk. Kayu @ Rp. 50,000.00 10,000.00
0.8000 org Pekerja @ Rp. 35,000.00 28,000.00
0.0400 org Mandor @ Rp. 47,500.00 1,900.00
JUMLAH ( BELUM PPN ) 134,900.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Mengerjakan daun pintu / jendela panil kayu jati


6.7 0.0400 m3 Kayu jati papan @ Rp. 22,000,000.00
03-3434-2002 2.5000 org Tukang kayu @ Rp. 47,500.00 118,750.00
0.2500 org Kepala tukang kayu @ Rp. 50,000.00 12,500.00
1.0000 org Pekerja @ Rp. 35,000.00 35,000.00
0.0500 org Mandor @ Rp. 47,500.00 2,375.00
JUMLAH ( BELUM PPN ) 168,625.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Mengerjakan daun pintu / jendela panil kayu jati lokal
6.7 0.0400 m3 Kayu jati papan lokal @ Rp. 18,700,000.00
03-3434-2002 2.5000 org Tukang kayu @ Rp. 47,500.00 118,750.00
0.2500 org Kepala tukang kayu @ Rp. 50,000.00 12,500.00

Analisa Gedung - 131


No. Macam Pekerjaan Upah
(1) (2) (3)
1.0000 org Pekerja @ Rp. 35,000.00 35,000.00
0.0500 org Mandor @ Rp. 47,500.00 2,375.00
JUMLAH ( BELUM PPN ) 168,625.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Mengerjakan daun pintu / jendela panil kayu kamper


6.8 0.0400 m3 Kayu kamper papan @ Rp. 8,000,000.00
03-3434-2002 2.5000 org Tukang kayu @ Rp. 47,500.00 118,750.00
0.2500 org Kepala tukang kayu @ Rp. 50,000.00 12,500.00
1.0000 org Pekerja @ Rp. 35,000.00 35,000.00
0.0500 org Mandor @ Rp. 47,500.00 2,375.00
JUMLAH ( BELUM PPN ) 168,625.00
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 132


No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m2 Mengerjakan daun pintu / jendela panil kayu kruing


0.0400 m3 Kayu kruing papan @ Rp. 4,750,000.00
03-3434-2002 2.5000 org Tukang kayu @ Rp. 47,500.00 118,750.00
0.2500 org Kepala tukang kayu @ Rp. 50,000.00 12,500.00
1.0000 org Pekerja @ Rp. 35,000.00 35,000.00
0.0500 org Mandor @ Rp. 47,500.00 2,375.00
JUMLAH ( BELUM PPN ) 168,625.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Mengerjakan daun pintu / jendela panil kayu bengkirai


0.0400 m3 Kayu bengkirai papan @ Rp. 8,200,000.00
03-3434-2002 2.5000 org Tukang kayu @ Rp. 47,500.00 118,750.00
0.2500 org Kepala tukang kayu @ Rp. 50,000.00 12,500.00
1.0000 org Pekerja @ Rp. 35,000.00 35,000.00
0.0500 org Mandor @ Rp. 47,500.00 2,375.00
JUMLAH ( BELUM PPN ) 168,625.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang pintu dan jendela jalusi kayu jati


6.12 0.0640 m3 Kayu jati papan @ Rp. 22,000,000.00
03-3434-2002 3.0000 org Tukang kayu @ Rp. 47,500.00 142,500.00
0.3000 org Kepala tukang kayu @ Rp. 50,000.00 15,000.00
1.0000 org Pekerja @ Rp. 35,000.00 35,000.00
0.3000 org Mandor @ Rp. 47,500.00 14,250.00
JUMLAH ( BELUM PPN ) 206,750.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang pintu dan jendela jalusi kayu jati


6.12 0.0640 m3 Kayu jati papan lokal @ Rp. 18,700,000.00
03-3434-2002 3.0000 org Tukang kayu @ Rp. 47,500.00 142,500.00
0.3000 org Kepala tukang kayu @ Rp. 50,000.00 15,000.00
1.0000 org Pekerja @ Rp. 35,000.00 35,000.00
0.3000 org Mandor @ Rp. 47,500.00 14,250.00
JUMLAH ( BELUM PPN ) 206,750.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang pintu dan jendela jalusi kayu kamper


6.13 0.0640 m3 Kayu kamper papan @ Rp. 8,000,000.00
03-3434-2002 3.0000 org Tukang kayu @ Rp. 47,500.00 142,500.00
0.3000 org Kepala tukang kayu @ Rp. 50,000.00 15,000.00

Analisa Gedung - 133


No. Macam Pekerjaan Upah
(1) (2) (3)
1.0000 org Pekerja @ Rp. 35,000.00 35,000.00
0.0500 org Mandor @ Rp. 47,500.00 2,375.00
JUMLAH ( BELUM PPN ) 194,875.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang pintu dan jendela jalusi kayu kruing


0.0640 m3 Kayu kruing papan @ Rp. 4,750,000.00
03-3434-2002 3.0000 org Tukang kayu @ Rp. 47,500.00 142,500.00
0.3000 org Kepala tukang kayu @ Rp. 50,000.00 15,000.00
1.0000 org Pekerja @ Rp. 35,000.00 35,000.00
0.0500 org Mandor @ Rp. 47,500.00 2,375.00
JUMLAH ( BELUM PPN ) 194,875.00
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 134


No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m2 Pasang pintu dan jendela jalusi kayu bengkirai


0.0640 m3 Kayu bengkirai papan @ Rp. 8,200,000.00
03-3434-2002 3.0000 org Tukang kayu @ Rp. 47,500.00 142,500.00
0.3000 org Kepala tukang kayu @ Rp. 50,000.00 15,000.00
1.0000 org Pekerja @ Rp. 35,000.00 35,000.00
0.0500 org Mandor @ Rp. 47,500.00 2,375.00
JUMLAH ( BELUM PPN ) 194,875.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang rangka langit-langit (1,00 x 1,00) m, kayu jati


6.38 0.0120 m3 Kayu jati balok @ Rp. 20,000,000.00
03-3434-2002 0.1000 kg Paku biasa 2" - 5" @ Rp. 9,000.00
0.2500 org Tukang kayu @ Rp. 47,500.00 11,875.00
0.0250 org Kepala tukang kayu @ Rp. 50,000.00 1,250.00
0.1500 org Pekerja @ Rp. 35,000.00 5,250.00
0.0075 org Mandor @ Rp. 47,500.00 356.25
JUMLAH ( BELUM PPN ) 18,731.25
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang rangka langit-langit (1,00 x 1,00) m, kayu jati lokal
6.38 0.0120 m3 Kayu jati balok lokal @ Rp. 16,500,000.00
03-3434-2002 0.1000 kg Paku biasa 2" - 5" @ Rp. 9,000.00
0.2500 org Tukang kayu @ Rp. 47,500.00 11,875.00
0.0250 org Kepala tukang kayu @ Rp. 50,000.00 1,250.00
0.1500 org Pekerja @ Rp. 35,000.00 5,250.00
0.0075 org Mandor @ Rp. 47,500.00 356.25
JUMLAH ( BELUM PPN ) 18,731.25
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang rangka langit-langit (1,00 x 1,00) m, kayu kamper


6.39 0.0120 m3 Kayu kamper balok @ Rp. 9,250,000.00
03-3434-2002 0.1000 kg Paku biasa 2" - 5" @ Rp. 9,000.00
0.2500 org Tukang kayu @ Rp. 47,500.00 11,875.00
0.0250 org Kepala tukang kayu @ Rp. 50,000.00 1,250.00
0.1500 org Pekerja @ Rp. 35,000.00 5,250.00
0.0075 org Mandor @ Rp. 47,500.00 356.25
JUMLAH ( BELUM PPN ) 18,731.25
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang rangka langit-langit (1,00 x 1,00) m, kayu kruing

Analisa Gedung - 135


No. Macam Pekerjaan Upah
(1) (2) (3)
0.0120 m3 Kayu kruing @ Rp. 4,350,000.00
03-3434-2002 0.1000 kg Paku biasa 2" - 5" @ Rp. 9,000.00
0.2500 org Tukang kayu @ Rp. 47,500.00 11,875.00
0.0250 org Kepala tukang kayu @ Rp. 50,000.00 1,250.00
0.1500 org Pekerja @ Rp. 35,000.00 5,250.00
0.0075 org Mandor @ Rp. 47,500.00 356.25
JUMLAH ( BELUM PPN ) 18,731.25
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 136


No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m2 Pasang rangka langit-langit (1,00 x 1,00) m, kayu bengkirai


0.0120 m3 Kayu bengkirai @ Rp. 7,800,000.00
03-3434-2002 0.1000 kg Paku biasa 2" - 5" @ Rp. 9,000.00
0.2500 org Tukang kayu @ Rp. 47,500.00 11,875.00
0.0250 org Kepala tukang kayu @ Rp. 50,000.00 1,250.00
0.1500 org Pekerja @ Rp. 35,000.00 5,250.00
0.0075 org Mandor @ Rp. 47,500.00 356.25
JUMLAH ( BELUM PPN ) 18,731.25
JASA 10 %
JUMLAH
DIBULATKAN

1.0000 m2 Pasang rangka langit-langit (60 x 120) cm, kayu jati


0.0130 m3 Kayu jati @ Rp. 20,000,000.00
0.1200 kg Paku @ Rp. 9,000.00
0.2700 org Tukang kayu @ Rp. 47,500.00 12,825.00
0.0270 org Kepala tukang kayu @ Rp. 50,000.00 1,350.00
0.1700 org Pekerja @ Rp. 35,000.00 5,950.00
0.0085 org Mandor @ Rp. 47,500.00 403.75
JUMLAH ( BELUM PPN ) 20,528.75
JASA 10 %
JUMLAH
DIBULATKAN

1.0000 m2 Pasang rangka langit-langit (60 x 120) m, kayu jati lokal


0.0130 m3 Kayu jati lokal @ Rp. 16,500,000.00
0.1200 kg Paku @ Rp. 9,000.00
0.2700 org Tukang kayu @ Rp. 47,500.00 12,825.00
0.0270 org Kepala tukang kayu @ Rp. 50,000.00 1,350.00
0.1700 org Pekerja @ Rp. 35,000.00 5,950.00
0.0085 org Mandor @ Rp. 47,500.00 403.75
JUMLAH ( BELUM PPN ) 20,528.75
JASA 10 %
JUMLAH
DIBULATKAN

1.0000 m2 Pasang rangka langit-langit (60 x 120) m, kayu kamper


0.0130 m3 Kayu kamper @ Rp. 9,250,000.00
0.1200 kg Paku @ Rp. 9,000.00
0.2700 org Tukang kayu @ Rp. 47,500.00 12,825.00
0.0270 org Kepala tukang kayu @ Rp. 50,000.00 1,350.00
0.1700 org Pekerja @ Rp. 35,000.00 5,950.00
0.0085 org Mandor @ Rp. 47,500.00 403.75
JUMLAH ( BELUM PPN ) 20,528.75
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 137


No. Macam Pekerjaan Upah
(1) (2) (3)
1.0000 m2 Pasang rangka langit-langit (60 x 120) m, kayu kruing
0.0130 m3 Kayu kruing @ Rp. 4,350,000.00
0.1200 kg Paku @ Rp. 9,000.00
0.2700 org Tukang kayu @ Rp. 47,500.00 12,825.00
0.0270 org Kepala tukang kayu @ Rp. 50,000.00 1,350.00
0.1700 org Pekerja @ Rp. 35,000.00 5,950.00
0.0085 org Mandor @ Rp. 47,500.00 403.75
JUMLAH ( BELUM PPN ) 20,528.75
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 138


No. Macam Pekerjaan Upah
(1) (2) (3)

1.0000 m2 Pasang rangka langit-langit (60 x 120) m, kayu bengkirai


0.0130 m3 Kayu bengkirai @ Rp. 7,800,000.00
0.1200 kg Paku @ Rp. 9,000.00
0.2700 org Tukang kayu @ Rp. 47,500.00 12,825.00
0.0270 org Kep. Tk. Kayu @ Rp. 50,000.00 1,350.00
0.1700 org Pekerja @ Rp. 35,000.00 5,950.00
0.0085 org Mandor @ Rp. 47,500.00 403.75
JUMLAH ( BELUM PPN ) 20,528.75
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Langit-langit asbes (1,00 x 1,00) m tanpa plepet


6.1 1.1000 lbr Pelat asbes @ Rp. 10,000.00
03-2838-2002 0.0100 kg Paku eternit @ Rp. 14,000.00
0.0700 org Tukang kayu @ Rp. 47,500.00 3,325.00
0.0070 org Kepala tukang kayu @ Rp. 50,000.00 350.00
0.0300 org Pekerja @ Rp. 35,000.00 1,050.00
0.0015 org Mandor @ Rp. 47,500.00 71.25
JUMLAH ( BELUM PPN ) 4,796.25
JASA 10 %
JUMLAH
DIBULATKAN

1.0000 m2 Langit-langit asbes (1,00 x 1,00) m memakai plepet


1.1000 lbr Pelat asbes @ Rp. 10,000.00
2.6000 m1 Plepet kayu @ Rp. 2,000.00
0.0100 kg Paku eternit @ Rp. 14,000.00
0.0100 kg Paku plepet @ Rp. 11,000.00
0.0700 org Tukang kayu @ Rp. 47,500.00 3,325.00
0.0070 org Kepala tukang kayu @ Rp. 50,000.00 350.00
0.0300 org Pekerja @ Rp. 35,000.00 1,050.00
0.0015 org Mandor @ Rp. 47,500.00 71.25
JUMLAH ( BELUM PPN ) 4,796.25
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu jati tanpa plepet
0.0120 m3 Kayu jati balok @ Rp. 20,000,000.00
03-2838-2002 0.0600 kg Paku biasa @ Rp. 11,000.00
1.1000 lbr Asbes 1,00 x 1,00 m @ Rp. 10,000.00
0.3200 org Tukang kayu @ Rp. 47,500.00 15,200.00
0.0320 org Kepala tukang kayu @ Rp. 50,000.00 1,600.00
0.1800 org Pekerja @ Rp. 35,000.00 6,300.00
0.0090 org Mandor @ Rp. 47,500.00 427.50
JUMLAH ( BELUM PPN ) 23,527.50
JASA 10 %
JUMLAH

Analisa Gedung - 139


No. Macam Pekerjaan Upah
(1) (2) (3)
DIBULATKAN

SNI 1.0000 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu jati lokal tanpa plepet
0.0120 m3 Kayu jati balok lokal @ Rp. 16,500,000.00
03-2838-2002 0.0600 kg Paku biasa @ Rp. 11,000.00
1.1000 lbr Asbes 1,00 x 1,00 m @ Rp. 10,000.00
0.3200 org Tukang kayu @ Rp. 47,500.00 15,200.00
0.0320 org Kepala tukang kayu @ Rp. 50,000.00 1,600.00
0.1800 org Pekerja @ Rp. 35,000.00 6,300.00
0.0090 org Mandor @ Rp. 47,500.00 427.50
JUMLAH ( BELUM PPN ) 23,527.50
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 140


No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu kamper tanpa plepet
0.0120 m3 Kayu kamper balok @ Rp. 9,250,000.00
03-2838-2002 0.0600 kg Paku biasa @ Rp. 11,000.00
1.1000 lbr Asbes 1,00 x 1,00 m @ Rp. 10,000.00
0.3200 org Tukang kayu @ Rp. 47,500.00 15,200.00
0.0320 org Kepala tukang kayu @ Rp. 50,000.00 1,600.00
0.1800 org Pekerja @ Rp. 35,000.00 6,300.00
0.0090 org Mandor @ Rp. 47,500.00 427.50
JUMLAH ( BELUM PPN ) 23,527.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu kruing tanpa plepet
0.0120 m3 Kayu kruing balok @ Rp. 4,350,000.00
03-2838-2002 0.0600 kg Paku biasa @ Rp. 11,000.00
1.1000 lbr Asbes 1,00 x 1,00 m @ Rp. 10,000.00
0.3200 org Tukang kayu @ Rp. 47,500.00 15,200.00
0.0320 org Kepala tukang kayu @ Rp. 50,000.00 1,600.00
0.1800 org Pekerja @ Rp. 35,000.00 6,300.00
0.0090 org Mandor @ Rp. 47,500.00 427.50
JUMLAH ( BELUM PPN ) 23,527.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu bengkirai tanpa plepet
0.0120 m3 Kayu bengkirai balok @ Rp. 7,800,000.00
03-2838-2002 0.0600 kg Paku biasa @ Rp. 11,000.00
1.1000 lbr Asbes 1,00 x 1,00 m @ Rp. 10,000.00
0.3200 org Tukang kayu @ Rp. 47,500.00 15,200.00
0.0320 org Kepala tukang kayu @ Rp. 50,000.00 1,600.00
0.1800 org Pekerja @ Rp. 35,000.00 6,300.00
0.0090 org Mandor @ Rp. 47,500.00 427.50
JUMLAH ( BELUM PPN ) 23,527.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu jati memakai plepet
0.0120 m3 Kayu jati balok @ Rp. 20,000,000.00
03-2838-2002 0.0600 kg Paku biasa @ Rp. 11,000.00
1.1000 lbr Asbes 1,00 x 1,00 m @ Rp. 10,000.00
2.6000 m1 Plepet kayu @ Rp. 2,000.00
0.0100 kg Paku eternit @ Rp. 14,000.00
0.0100 kg Paku plepet @ Rp. 11,000.00
0.3200 org Tukang kayu @ Rp. 47,500.00 15,200.00
0.0320 org Kepala tukang kayu @ Rp. 50,000.00 1,600.00

Analisa Gedung - 141


No. Macam Pekerjaan Upah
(1) (2) (3)
0.1800 org Pekerja @ Rp. 35,000.00 6,300.00
0.0090 org Mandor @ Rp. 47,500.00 427.50
JUMLAH ( BELUM PPN ) 23,527.50
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 142


No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu jati lokal memakai plepet
0.0120 m3 Kayu jati balok lokal @ Rp. 16,500,000.00
03-2838-2002 0.0600 kg Paku biasa @ Rp. 11,000.00
1.1000 lbr Asbes 1,00 x 1,00 m @ Rp. 10,000.00
2.6000 m1 Plepet kayu @ Rp. 2,000.00
0.0100 kg Paku eternit @ Rp. 14,000.00
0.0100 kg Paku plepet @ Rp. 11,000.00
0.3200 org Tukang kayu @ Rp. 47,500.00 15,200.00
0.0320 org Kepala tukang kayu @ Rp. 50,000.00 1,600.00
0.1800 org Pekerja @ Rp. 35,000.00 6,300.00
0.0090 org Mandor @ Rp. 47,500.00 427.50
JUMLAH ( BELUM PPN ) 23,527.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu kamper memakai plepet
0.0120 m3 Kayu kamper balok @ Rp. 9,250,000.00
03-2838-2002 0.0600 kg Paku biasa @ Rp. 11,000.00
1.1000 lbr Asbes 1,00 x 1,00 m @ Rp. 10,000.00
2.6000 m1 Plepet kayu @ Rp. 2,000.00
0.0100 kg Paku eternit @ Rp. 14,000.00
0.0100 kg Paku plepet @ Rp. 11,000.00
0.3200 org Tukang kayu @ Rp. 47,500.00 15,200.00
0.0320 org Kepala tukang kayu @ Rp. 50,000.00 1,600.00
0.1800 org Pekerja @ Rp. 35,000.00 6,300.00
0.0090 org Mandor @ Rp. 47,500.00 427.50
JUMLAH ( BELUM PPN ) 23,527.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu kruing memakai plepet
0.0120 m3 Kayu kruing balok @ Rp. 4,350,000.00
03-2838-2002 0.0600 kg Paku biasa @ Rp. 11,000.00
1.1000 lbr Asbes 1,00 x 1,00 m @ Rp. 10,000.00
2.6000 m1 Plepet kayu @ Rp. 2,000.00
0.0100 kg Paku eternit @ Rp. 14,000.00
0.0100 kg Paku plepet @ Rp. 11,000.00
0.3200 org Tukang kayu @ Rp. 47,500.00 15,200.00
0.0320 org Kepala tukang kayu @ Rp. 50,000.00 1,600.00
0.1800 org Pekerja @ Rp. 35,000.00 6,300.00
0.0090 org Mandor @ Rp. 47,500.00 427.50
JUMLAH ( BELUM PPN ) 23,527.50
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 143


No. Macam Pekerjaan Upah
(1) (2) (3)
SNI 1.0000 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu bengkirai memakai plepet
0.0120 m3 Kayu bengkirai balok @ Rp. 7,800,000.00
03-2838-2002 0.0600 kg Paku biasa @ Rp. 11,000.00
1.1000 lbr Asbes 1,00 x 1,00 m @ Rp. 10,000.00
2.6000 m1 Plepet kayu @ Rp. 2,000.00
0.0100 kg Paku eternit @ Rp. 14,000.00
0.0100 kg Paku plepet @ Rp. 11,000.00
0.3200 org Tukang kayu @ Rp. 47,500.00 15,200.00
0.0320 org Kepala tukang kayu @ Rp. 50,000.00 1,600.00
0.1800 org Pekerja @ Rp. 35,000.00 6,300.00
0.0090 org Mandor @ Rp. 47,500.00 427.50
JUMLAH ( BELUM PPN ) 23,527.50
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 144


No. Macam Pekerjaan Upah
(1) (2) (3)

6.13 1.0000 m2 Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu jati
0.0130 m3 Kayu jati @ Rp. 20,000,000.00
0.3600 lbr Gypsum board 9 mm @ Rp. 55,000.00
0.0500 roll Kasa gypsum @ Rp. 10,000.00
0.4500 kg Tepung gypsum @ Rp. 3,500.00
0.0030 kg Alkasit @ Rp. 300,000.00
0.0500 kg Paku gypsum @ Rp. 20,000.00
0.1200 kg Paku usuk @ Rp. 9,000.00
0.3700 org Tukang kayu @ Rp. 47,500.00 17,575.00
0.0370 org Kepala tukang kayu @ Rp. 50,000.00 1,850.00
0.2400 org Pekerja @ Rp. 35,000.00 8,400.00
0.0120 org Mandor @ Rp. 47,500.00 570.00
JUMLAH ( BELUM PPN ) 28,395.00
JASA 10 %
JUMLAH
DIBULATKAN

6.13 1.0000 m2 Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu jati lokal
0.0130 m3 Kayu jati lokal @ Rp. 16,500,000.00
0.3600 lbr Gypsum board 9 mm @ Rp. 55,000.00
0.0500 roll Kasa gypsum @ Rp. 10,000.00
0.4500 kg Tepung gypsum @ Rp. 3,500.00
0.0030 kg Alkasit @ Rp. 300,000.00
0.0500 kg Paku gypsum @ Rp. 20,000.00
0.1200 kg Paku usuk @ Rp. 9,000.00
0.3700 org Tukang kayu @ Rp. 47,500.00 17,575.00
0.0370 org Kepala tukang kayu @ Rp. 50,000.00 1,850.00
0.2400 org Pekerja @ Rp. 35,000.00 8,400.00
0.0120 org Mandor @ Rp. 47,500.00 570.00
JUMLAH ( BELUM PPN ) 28,395.00
JASA 10 %
JUMLAH
DIBULATKAN

6.13 1.0000 m2 Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu kamper
0.0130 m3 Kayu kamper @ Rp. 9,250,000.00
0.3600 lbr Gypsum board 9 mm @ Rp. 55,000.00
0.0500 roll Kasa gypsum @ Rp. 10,000.00
0.4500 kg Tepung gypsum @ Rp. 3,500.00
0.0030 kg Alkasit @ Rp. 300,000.00
0.0500 kg Paku gypsum @ Rp. 20,000.00
0.1200 kg Paku usuk @ Rp. 9,000.00
0.3700 org Tukang kayu @ Rp. 47,500.00 17,575.00
0.0370 org Kepala tukang kayu @ Rp. 50,000.00 1,850.00
0.2400 org Pekerja @ Rp. 35,000.00 8,400.00
0.0120 org Mandor @ Rp. 47,500.00 570.00
JUMLAH ( BELUM PPN ) 28,395.00
JASA 10 %
JUMLAH

Analisa Gedung - 145


No. Macam Pekerjaan Upah
(1) (2) (3)
DIBULATKAN

6.13 1.0000 m2 Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu kruing
0.0130 m3 Kayu kruing @ Rp. 4,350,000.00
0.3600 lbr Gypsum board 9 mm @ Rp. 55,000.00
0.0500 roll Kasa gypsum @ Rp. 10,000.00
0.4500 kg Tepung gypsum @ Rp. 3,500.00
0.0030 kg Alkasit @ Rp. 300,000.00
0.0500 kg Paku gypsum @ Rp. 20,000.00
0.1200 kg Paku usuk @ Rp. 9,000.00
0.3700 org Tukang kayu @ Rp. 47,500.00 17,575.00
0.0370 org Kepala tukang kayu @ Rp. 50,000.00 1,850.00
0.2400 org Pekerja @ Rp. 35,000.00 8,400.00
0.0120 org Mandor @ Rp. 47,500.00 570.00
JUMLAH ( BELUM PPN ) 28,395.00
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 146


No. Macam Pekerjaan Upah
(1) (2) (3)

1.0000 m2 Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu bengkirai
0.0130 m3 Kayu bengkirai @ Rp. 7,800,000.00
0.3600 lbr Gypsum board 9 mm @ Rp. 55,000.00
0.0500 roll Kasa gypsum @ Rp. 10,000.00
0.4500 kg Tepung gypsum @ Rp. 3,500.00
0.0030 kg Alkasit @ Rp. 300,000.00
0.0500 kg Paku gypsum @ Rp. 20,000.00
0.1200 kg Paku usuk @ Rp. 9,000.00
0.3700 org Tukang kayu @ Rp. 47,500.00 17,575.00
0.0370 org Kepala tukang kayu @ Rp. 50,000.00 1,850.00
0.2400 org Pekerja @ Rp. 35,000.00 8,400.00
0.0120 org Mandor @ Rp. 47,500.00 570.00
JUMLAH ( BELUM PPN ) 28,395.00
JASA 10 %
JUMLAH
DIBULATKAN

1.0000 m2 Langit-langit gypsum board tebal 9 mm, rangka hollow


4.5000 m1 Rangka hollow 4x4 cm @ Rp. 9,500.00
0.3600 lbr Gypsum board 9 mm @ Rp. 55,000.00
0.0500 roll Kasa gypsum @ Rp. 10,000.00
0.4500 kg Tepung gypsum @ Rp. 3,500.00
0.0030 kg Alkasit @ Rp. 300,000.00
0.1500 kg Paku skrup @ Rp. 10,000.00
5.0000 m1 Kawat penggantung @ Rp. 500.00
0.3700 org Tukang kayu @ Rp. 47,500.00 17,575.00
0.0370 org Kepala tukang kayu @ Rp. 50,000.00 1,850.00
0.2400 org Pekerja @ Rp. 35,000.00 8,400.00
0.0120 org Mandor @ Rp. 47,500.00 570.00
JUMLAH ( BELUM PPN ) 28,395.00
JASA 10 %
JUMLAH
DIBULATKAN

6.13 1.0000 m2 Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu jati
0.0130 m3 Kayu jati @ Rp. 20,000,000.00
0.3600 lbr Kalsiboard 3.5 mm @ Rp. 46,200.00
0.0500 roll Kasa gypsum @ Rp. 10,000.00
0.4500 kg Tepung gypsum @ Rp. 3,500.00
0.0030 kg Alkasit @ Rp. 300,000.00
0.0500 kg Paku gypsum @ Rp. 20,000.00
0.1200 kg Paku usuk @ Rp. 9,000.00
0.3700 org Tukang kayu @ Rp. 47,500.00 17,575.00
0.0370 org Kepala tukang kayu @ Rp. 50,000.00 1,850.00
0.2400 org Pekerja @ Rp. 35,000.00 8,400.00
0.0120 org Mandor @ Rp. 47,500.00 570.00
JUMLAH ( BELUM PPN ) 28,395.00
JASA 10 %
JUMLAH

Analisa Gedung - 147


No. Macam Pekerjaan Upah
(1) (2) (3)
DIBULATKAN

6.13 1.0000 m2 Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu jati lokal
0.0130 m3 Kayu jati lokal @ Rp. 16,500,000.00
0.3600 lbr Kalsiboard 3.5 mm @ Rp. 46,200.00
0.0500 roll Kasa gypsum @ Rp. 10,000.00
0.4500 kg Tepung gypsum @ Rp. 3,500.00
0.0030 kg Alkasit @ Rp. 300,000.00
0.0500 kg Paku gypsum @ Rp. 20,000.00
0.1200 kg Paku usuk @ Rp. 9,000.00
0.3700 org Tukang kayu @ Rp. 47,500.00 17,575.00
0.0370 org Kepala tukang kayu @ Rp. 50,000.00 1,850.00
0.2400 org Pekerja @ Rp. 35,000.00 8,400.00
0.0120 org Mandor @ Rp. 47,500.00 570.00
JUMLAH ( BELUM PPN ) 28,395.00
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 148


No. Macam Pekerjaan Upah
(1) (2) (3)

6.13 1.0000 m2 Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu kamper
0.0130 m3 Kayu kamper @ Rp. 9,250,000.00
0.3600 lbr Kalsiboard 3.5 mm @ Rp. 46,200.00
0.0500 roll Kasa gypsum @ Rp. 10,000.00
0.4500 kg Tepung gypsum @ Rp. 3,500.00
0.0030 kg Alkasit @ Rp. 300,000.00
0.0500 kg Paku gypsum @ Rp. 20,000.00
0.1200 kg Paku usuk @ Rp. 9,000.00
0.3700 org Tukang kayu @ Rp. 47,500.00 17,575.00
0.0370 org Kepala tukang kayu @ Rp. 50,000.00 1,850.00
0.2400 org Pekerja @ Rp. 35,000.00 8,400.00
0.0120 org Mandor @ Rp. 47,500.00 570.00
JUMLAH ( BELUM PPN ) 28,395.00
JASA 10 %
JUMLAH
DIBULATKAN

6.13 1.0000 m2 Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu kruing
0.0130 m3 Kayu kruing @ Rp. 4,350,000.00
0.3600 lbr Kalsiboard 3.5 mm @ Rp. 46,200.00
0.0500 roll Kasa gypsum @ Rp. 10,000.00
0.4500 kg Tepung gypsum @ Rp. 3,500.00
0.0030 kg Alkasit @ Rp. 300,000.00
0.0500 kg Paku gypsum @ Rp. 20,000.00
0.1200 kg Paku usuk @ Rp. 9,000.00
0.3700 org Tukang kayu @ Rp. 47,500.00 17,575.00
0.0370 org Kepala tukang kayu @ Rp. 50,000.00 1,850.00
0.2400 org Pekerja @ Rp. 35,000.00 8,400.00
0.0120 org Mandor @ Rp. 47,500.00 570.00
JUMLAH ( BELUM PPN ) 28,395.00
JASA 10 %
JUMLAH
DIBULATKAN

1.0000 m2 Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu bengkirai
0.0130 m3 Kayu bengkirai @ Rp. 7,800,000.00
0.3600 lbr Kalsiboard 3.5 mm @ Rp. 46,200.00
0.0500 roll Kasa gypsum @ Rp. 10,000.00
0.4500 kg Tepung gypsum @ Rp. 3,500.00
0.0030 kg Alkasit @ Rp. 300,000.00
0.0500 kg Paku gypsum @ Rp. 20,000.00
0.1200 kg Paku usuk @ Rp. 9,000.00
0.3700 org Tukang kayu @ Rp. 47,500.00 17,575.00
0.0370 org Kepala tukang kayu @ Rp. 50,000.00 1,850.00
0.2400 org Pekerja @ Rp. 35,000.00 8,400.00
0.0120 org Mandor @ Rp. 47,500.00 570.00
JUMLAH ( BELUM PPN ) 28,395.00
JASA 10 %
JUMLAH

Analisa Gedung - 149


No. Macam Pekerjaan Upah
(1) (2) (3)
DIBULATKAN

1.0000 m2 Langit-langit kalsiboard tebal 3.5 mm, rangka hollow


4.5000 m1 Rangka hollow 4x4 cm @ Rp. 9,500.00
0.3600 lbr Kalsiboard 3.5 mm @ Rp. 46,200.00
0.0500 roll Kasa gypsum @ Rp. 10,000.00
0.4500 kg Tepung gypsum @ Rp. 3,500.00
0.0030 kg Alkasit @ Rp. 300,000.00
0.1500 kg Paku skrup @ Rp. 10,000.00
5.0000 m1 Kawat penggantung @ Rp. 500.00
0.3700 org Tukang kayu @ Rp. 47,500.00 17,575.00
0.0370 org Kepala tukang kayu @ Rp. 50,000.00 1,850.00
0.2400 org Pekerja @ Rp. 35,000.00 8,400.00
0.0120 org Mandor @ Rp. 47,500.00 570.00
JUMLAH ( BELUM PPN ) 28,395.00
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 150


No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m2 Langit-langit akustik 60 x 120 cm + rangka alumunium


03-3438-2002 3.6000 m1 Profil alumunium "T" @ Rp. 20,000.00
6.18 0.1500 kg Kawat seng polos @ Rp. 9,500.00
1.0000 bh Ramset / dina bolt @ Rp. 2,500.00
1.5000 lbr Akustic Armstrong 60 x 120 cm @ Rp. 125,000.00
0.5000 org Tukang kayu @ Rp. 47,500.00 23,750.00
0.0500 org Kepala tukang kayu @ Rp. 50,000.00 2,500.00
0.1500 org Pekerja @ Rp. 35,000.00 5,250.00
0.0075 org Mandor @ Rp. 47,500.00 356.25
JUMLAH ( BELUM PPN ) 31,856.25
JASA 10 %
JUMLAH
DIBULATKAN

1.0000 m1 Pasang list profil cornees gypsum lebar sampai 5 cm


1.1000 m1 List profil cornees gypsum @ Rp. 4,000.00
0.7000 kg Tepung gypsum @ Rp. 3,500.00
0.0035 kg Alkasit @ Rp. 300,000.00
0.0375 org Tukang kayu @ Rp. 47,500.00 1,781.25
0.0037 org Kepala tukang kayu @ Rp. 50,000.00 185.00
0.1125 org Pekerja @ Rp. 35,000.00 3,937.50
0.0065 org Mandor @ Rp. 47,500.00 308.75
JUMLAH ( BELUM PPN ) 6,212.50
JASA 10 %
JUMLAH
DIBULATKAN

1.0000 m1 Pasang list profil cornees gypsum lebar 5 - 10 cm


1.1000 m1 List profil cornees gypsum @ Rp. 8,000.00
0.8750 kg Tepung gypsum @ Rp. 3,500.00
0.0044 kg Alkasit @ Rp. 300,000.00
0.0375 org Tukang kayu @ Rp. 47,500.00 1,781.25
0.0037 org Kepala tukang kayu @ Rp. 50,000.00 185.00
0.1125 org Pekerja @ Rp. 35,000.00 3,937.50
0.0065 org Mandor @ Rp. 47,500.00 308.75
JUMLAH ( BELUM PPN ) 6,212.50
JASA 10 %
JUMLAH
DIBULATKAN

1.0000 m1 Pasang list profil cornees gypsum lebar lebih dari 10 cm


1.1000 m1 List profil cornees gypsum @ Rp. 15,000.00
1.0500 kg Tepung gypsum @ Rp. 3,500.00
0.0053 kg Alkasit @ Rp. 300,000.00
0.0400 org Tukang kayu @ Rp. 47,500.00 1,900.00
0.0040 org Kepala tukang kayu @ Rp. 50,000.00 200.00
0.1125 org Pekerja @ Rp. 35,000.00 3,937.50
0.0065 org Mandor @ Rp. 47,500.00 308.75
JUMLAH ( BELUM PPN ) 6,346.25

Analisa Gedung - 151


No. Macam Pekerjaan Upah
(1) (2) (3)
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m1 List langit-langit kayu profil


6.19 1.1000 m1 List kayu profil @ Rp. 5,500.00
03-2838-2002 0.0100 kg Paku @ Rp. 11,000.00
0.0500 org Tukang kayu @ Rp. 47,500.00 2,375.00
0.0050 org Kepala tukang kayu @ Rp. 50,000.00 250.00
0.0500 org Pekerja @ Rp. 35,000.00 1,750.00
0.0030 org Mandor @ Rp. 47,500.00 142.50
JUMLAH ( BELUM PPN ) 4,517.50
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 152


No. Macam Pekerjaan Upah
(1) (2) (3)

1.0000 m1 Pasang lisplank ukuran (2 x 20) cm, kayu jati


0.0048 m3 Kayu jati papan @ Rp. 22,000,000.00
0.0600 kg Paku biasa 2" - 5" @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kepala tukang kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0050 org Mandor @ Rp. 47,500.00 237.50
JUMLAH ( BELUM PPN ) 8,987.50
JASA 10 %
JUMLAH
DIBULATKAN

1.0000 m1 Pasang lisplank ukuran (2 x 25) cm, kayu jati


0.0060 m3 Kayu jati papan @ Rp. 22,000,000.00
0.0600 kg Paku biasa 2" - 5" @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kepala tukang kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0050 org Mandor @ Rp. 47,500.00 237.50
JUMLAH ( BELUM PPN ) 8,987.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m1 Pasang lisplank ukuran (3 x 20) cm, kayu jati


6.47 0.0072 m3 Kayu jati papan @ Rp. 22,000,000.00
03-3434-2002 0.0500 kg Paku biasa 2" - 5" @ Rp. 9,000.00
0.2000 org Tukang kayu @ Rp. 47,500.00 9,500.00
0.0250 org Kepala tukang kayu @ Rp. 50,000.00 1,250.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0050 org Mandor @ Rp. 47,500.00 237.50
JUMLAH ( BELUM PPN ) 14,487.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m1 Pasang lisplank ukuran (3 x 30) cm, kayu jati


6.49 0.0110 m3 Kayu jati papan @ Rp. 22,000,000.00
03-3434-2002 0.0500 kg Paku biasa 2" - 5" @ Rp. 9,000.00
0.2200 org Tukang kayu @ Rp. 47,500.00 10,450.00
0.0220 org Kepala tukang kayu @ Rp. 50,000.00 1,100.00
0.1100 org Pekerja @ Rp. 35,000.00 3,850.00
0.0050 org Mandor @ Rp. 47,500.00 237.50
JUMLAH ( BELUM PPN ) 15,637.50
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 153


No. Macam Pekerjaan Upah
(1) (2) (3)
SNI 1.0000 m1 Pasang lisplank ukuran 2 x (3 x 20) cm, kayu jati
0.0145 m3 Kayu jati papan @ Rp. 22,000,000.00
03-3434-2002 0.0600 kg Paku biasa 2" - 5" @ Rp. 9,000.00
0.2500 org Tukang kayu @ Rp. 47,500.00 11,875.00
0.0250 org Kepala tukang kayu @ Rp. 50,000.00 1,250.00
0.1500 org Pekerja @ Rp. 35,000.00 5,250.00
0.0075 org Mandor @ Rp. 47,500.00 356.25
JUMLAH ( BELUM PPN ) 18,731.25
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 154


No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m1 Pasang lisplank ukuran 2 x (2 x 20) cm, kayu jati


0.0086 m3 Kayu jati papan @ Rp. 22,000,000.00
03-3434-2002 0.0600 kg Paku biasa 2" - 5" @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kepala tukang kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0050 org Mandor @ Rp. 47,500.00 237.50
JUMLAH ( BELUM PPN ) 8,987.50
JASA 10 %
JUMLAH
DIBULATKAN

1.0000 m1 Pasang lisplank ukuran (2 x 20) cm, kayu jati lokal


0.0048 m3 Papan kayu jati lokal @ Rp. 18,700,000.00
0.0600 kg Paku biasa 2" - 5" @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kepala tukang kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0050 org Mandor @ Rp. 47,500.00 237.50
JUMLAH ( BELUM PPN ) 8,987.50
JASA 10 %
JUMLAH
DIBULATKAN

1.0000 m1 Pasang lisplank ukuran (2 x 25) cm, kayu jati lokal


0.0060 m3 Papan kayu jati lokal @ Rp. 18,700,000.00
0.0600 kg Paku biasa 2" - 5" @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kepala tukang kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0050 org Mandor @ Rp. 47,500.00 237.50
JUMLAH ( BELUM PPN ) 8,987.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m1 Pasang lisplank ukuran (3 x 20) cm, kayu jati lokal
6.47 0.0072 m3 Papan kayu jati lokal @ Rp. 18,700,000.00
03-3434-2002 0.0500 kg Paku biasa 2" - 5" @ Rp. 9,000.00
0.2000 org Tukang kayu @ Rp. 47,500.00 9,500.00
0.0250 org Kepala tukang kayu @ Rp. 50,000.00 1,250.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0050 org Mandor @ Rp. 47,500.00 237.50
JUMLAH ( BELUM PPN ) 14,487.50
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 155


No. Macam Pekerjaan Upah
(1) (2) (3)
SNI 1.0000 m1 Pasang lisplank ukuran (3 x 30) cm, kayu jati lokal
6.49 0.0110 m3 Papan kayu jati lokal @ Rp. 18,700,000.00
03-3434-2002 0.0500 kg Paku biasa 2" - 5" @ Rp. 9,000.00
0.2200 org Tukang kayu @ Rp. 47,500.00 10,450.00
0.0220 org Kepala tukang kayu @ Rp. 50,000.00 1,100.00
0.1100 org Pekerja @ Rp. 35,000.00 3,850.00
0.0050 org Mandor @ Rp. 47,500.00 237.50
JUMLAH ( BELUM PPN ) 15,637.50
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 156


No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m1 Pasang lisplank ukuran 2 x (3 x 20) cm, kayu jati lokal
0.0145 m3 Papan kayu jati lokal @ Rp. 18,700,000.00
03-3434-2002 0.0600 kg Paku biasa 2" - 5" @ Rp. 9,000.00
0.2500 org Tukang kayu @ Rp. 47,500.00 11,875.00
0.0250 org Kepala tukang kayu @ Rp. 50,000.00 1,250.00
0.1500 org Pekerja @ Rp. 35,000.00 5,250.00
0.0075 org Mandor @ Rp. 47,500.00 356.25
JUMLAH ( BELUM PPN ) 18,731.25
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m1 Pasang lisplank ukuran 2 x (2 x 20) cm, kayu jati lokal
0.0086 m3 Papan kayu jati lokal @ Rp. 18,700,000.00
03-3434-2002 0.0600 kg Paku biasa 2" - 5" @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kepala tukang kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0050 org Mandor @ Rp. 47,500.00 237.50
JUMLAH ( BELUM PPN ) 8,987.50
JASA 10 %
JUMLAH
DIBULATKAN

1.0000 m1 Pasang lisplank ukuran (2 x 20) cm, kayu kamper


0.0048 m3 Kayu kamper papan @ Rp. 8,000,000.00
0.0600 kg Paku biasa 2" - 5" @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kepala tukang kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0050 org Mandor @ Rp. 47,500.00 237.50
JUMLAH ( BELUM PPN ) 8,987.50
JASA 10 %
JUMLAH
DIBULATKAN

1.0000 m1 Pasang lisplank ukuran (2 x 25) cm, kayu kamper


0.0060 m3 Kayu kamper papan @ Rp. 8,000,000.00
0.0600 kg Paku biasa 2" - 5" @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kepala tukang kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0050 org Mandor @ Rp. 47,500.00 237.50
JUMLAH ( BELUM PPN ) 8,987.50
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 157


No. Macam Pekerjaan Upah
(1) (2) (3)
SNI 1.0000 m1 Pasang lisplank ukuran (3 x 20) cm, kayu kamper
6.48 0.0072 m3 Kayu kamper papan @ Rp. 8,000,000.00
03-3434-2002 0.0500 kg Paku biasa 2" - 5" @ Rp. 9,000.00
0.2000 org Tukang kayu @ Rp. 47,500.00 9,500.00
0.0200 org Kepala tukang kayu @ Rp. 50,000.00 1,000.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0050 org Mandor @ Rp. 47,500.00 237.50
JUMLAH ( BELUM PPN ) 14,237.50
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 158


No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m1 Pasang lisplank ukuran (3 x 30) cm, kayu kamper


6.50 0.0110 m3 Kayu kamper papan @ Rp. 8,000,000.00
03-3434-2002 0.0500 kg Paku biasa 2" - 5" @ Rp. 9,000.00
0.2200 org Tukang kayu @ Rp. 47,500.00 10,450.00
0.0220 org Kepala tukang kayu @ Rp. 50,000.00 1,100.00
0.1100 org Pekerja @ Rp. 35,000.00 3,850.00
0.0050 org Mandor @ Rp. 47,500.00 237.50
JUMLAH ( BELUM PPN ) 15,637.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m1 Pasang lisplank ukuran 2 x (3 x 20) cm, kayu kamper


6.51 0.0145 m3 Kayu kamper papan @ Rp. 8,000,000.00
03-3434-2002 0.0600 kg Paku biasa 2" - 5" @ Rp. 9,000.00
0.2500 org Tukang kayu @ Rp. 47,500.00 11,875.00
0.0250 org Kepala tukang kayu @ Rp. 50,000.00 1,250.00
0.1500 org Pekerja @ Rp. 35,000.00 5,250.00
0.0075 org Mandor @ Rp. 47,500.00 356.25
JUMLAH ( BELUM PPN ) 18,731.25
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m1 Pasang lisplank ukuran 2 x (2 x 20) cm, kayu kamper


6.52 0.0086 m3 Kayu kamper papan @ Rp. 8,000,000.00
03-3434-2002 0.0600 kg Paku biasa 2" - 5" @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kepala tukang kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0050 org Mandor @ Rp. 47,500.00 237.50
JUMLAH ( BELUM PPN ) 8,987.50
JASA 10 %
JUMLAH
DIBULATKAN

1.0000 m1 Pasang lisplank ukuran (2 x 20) cm, kayu kruing


0.0048 m3 Kayu kruing papan @ Rp. 4,750,000.00
0.0600 kg Paku biasa 2" - 5" @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kepala tukang kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0050 org Mandor @ Rp. 47,500.00 237.50
JUMLAH ( BELUM PPN ) 8,987.50
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 159


No. Macam Pekerjaan Upah
(1) (2) (3)
1.0000 m1 Pasang lisplank ukuran (2 x 25) cm, kayu kruing
0.0060 m3 Kayu kruing papan @ Rp. 4,750,000.00
0.0600 kg Paku biasa 2" - 5" @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kepala tukang kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0050 org Mandor @ Rp. 47,500.00 237.50
JUMLAH ( BELUM PPN ) 8,987.50
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 160


No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m1 Pasang lisplank ukuran (3 x 20) cm, kayu kruing


0.0072 m3 Kayu kruing papan @ Rp. 4,750,000.00
03-3434-2002 0.0500 kg Paku biasa 2" - 5" @ Rp. 9,000.00
0.2000 org Tukang kayu @ Rp. 47,500.00 9,500.00
0.0200 org Kepala tukang kayu @ Rp. 50,000.00 1,000.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0050 org Mandor @ Rp. 47,500.00 237.50
JUMLAH ( BELUM PPN ) 14,237.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m1 Pasang lisplank ukuran (3 x 30) cm, kayu kruing


6.50 0.0110 m3 Kayu kruing papan @ Rp. 4,750,000.00
03-3434-2002 0.0500 kg Paku biasa 2" - 5" @ Rp. 9,000.00
0.2200 org Tukang kayu @ Rp. 47,500.00 10,450.00
0.0220 org Kepala tukang kayu @ Rp. 50,000.00 1,100.00
0.1100 org Pekerja @ Rp. 35,000.00 3,850.00
0.0050 org Mandor @ Rp. 47,500.00 237.50
JUMLAH ( BELUM PPN ) 15,637.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m1 Pasang lisplank ukuran 2 x (3 x 20) cm, kayu kruing


6.51 0.0145 m3 Kayu kruing papan @ Rp. 4,750,000.00
03-3434-2002 0.0600 kg Paku biasa 2" - 5" @ Rp. 9,000.00
0.2500 org Tukang kayu @ Rp. 47,500.00 11,875.00
0.0250 org Kepala tukang kayu @ Rp. 50,000.00 1,250.00
0.1500 org Pekerja @ Rp. 35,000.00 5,250.00
0.0075 org Mandor @ Rp. 47,500.00 356.25
JUMLAH ( BELUM PPN ) 18,731.25
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m1 Pasang lisplank ukuran 2 x (2 x 20) cm, kayu kruing


6.52 0.0086 m3 Kayu kruing papan @ Rp. 4,750,000.00
03-3434-2002 0.0600 kg Paku biasa 2" - 5" @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kepala tukang kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0050 org Mandor @ Rp. 47,500.00 237.50
JUMLAH ( BELUM PPN ) 8,987.50
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 161


No. Macam Pekerjaan Upah
(1) (2) (3)
1.0000 m1 Pasang lisplank ukuran (2 x 20) cm, kayu bengkirai
0.0048 m3 Kayu bengkirai papan @ Rp. 8,200,000.00
0.0600 kg Paku biasa 2" - 5" @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kepala tukang kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0050 org Mandor @ Rp. 47,500.00 237.50
JUMLAH ( BELUM PPN ) 8,987.50
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 162


No. Macam Pekerjaan Upah
(1) (2) (3)

1.0000 m1 Pasang lisplank ukuran (2 x 25) cm, kayu bengkirai


0.0060 m3 Kayu bengkirai papan @ Rp. 8,200,000.00
0.0600 kg Paku biasa 2" - 5" @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kepala tukang kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0050 org Mandor @ Rp. 47,500.00 237.50
JUMLAH ( BELUM PPN ) 8,987.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m1 Pasang lisplank ukuran (3 x 20) cm, kayu bengkirai


0.0072 m3 Kayu bengkirai papan @ Rp. 8,200,000.00
03-3434-2002 0.0500 kg Paku biasa 2" - 5" @ Rp. 9,000.00
0.2000 org Tukang kayu @ Rp. 47,500.00 9,500.00
0.0200 org Kepala tukang kayu @ Rp. 50,000.00 1,000.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0050 org Mandor @ Rp. 47,500.00 237.50
JUMLAH ( BELUM PPN ) 14,237.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m1 Pasang lisplank ukuran (3 x 30) cm, kayu bengkirai


6.50 0.0110 m3 Kayu bengkirai papan @ Rp. 8,200,000.00
03-3434-2002 0.0500 kg Paku biasa 2" - 5" @ Rp. 9,000.00
0.2200 org Tukang kayu @ Rp. 47,500.00 10,450.00
0.0220 org Kepala tukang kayu @ Rp. 50,000.00 1,100.00
0.1100 org Pekerja @ Rp. 35,000.00 3,850.00
0.0050 org Mandor @ Rp. 47,500.00 237.50
JUMLAH ( BELUM PPN ) 15,637.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m1 Pasang lisplank ukuran 2 x (3 x 20) cm, kayu bengkirai


6.51 0.0145 m3 Kayu bengkirai papan @ Rp. 8,200,000.00
03-3434-2002 0.0600 kg Paku biasa 2" - 5" @ Rp. 9,000.00
0.2500 org Tukang kayu @ Rp. 47,500.00 11,875.00
0.0250 org Kepala tukang kayu @ Rp. 50,000.00 1,250.00
0.1500 org Pekerja @ Rp. 35,000.00 5,250.00
0.0075 org Mandor @ Rp. 47,500.00 356.25
JUMLAH ( BELUM PPN ) 18,731.25
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 163


No. Macam Pekerjaan Upah
(1) (2) (3)
SNI 1.0000 m1 Pasang lisplank ukuran 2 x (2 x 20) cm, kayu bengkirai
6.52 0.0086 m3 Kayu bengkirai papan @ Rp. 8,200,000.00
03-3434-2002 0.0600 kg Paku biasa 2" - 5" @ Rp. 9,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kepala tukang kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0050 org Mandor @ Rp. 47,500.00 237.50
JUMLAH ( BELUM PPN ) 8,987.50
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 164


No. Macam Pekerjaan Upah
(1) (2) (3)

AK 1.0000 m2 Membuat listplank asbes plat ram kayu jati


0.0250 m3 Ram kayu jati @ Rp. 20,000,000.00
1.0000 m 2
Asbes plat @ Rp. 10,000.00
0.3000 kg Paku reng @ Rp. 9,000.00
1.8000 org Tukang kayu @ Rp. 47,500.00 85,500.00
0.1800 org Kep. Tk. Kayu @ Rp. 50,000.00 9,000.00
0.6000 org Pekerja @ Rp. 35,000.00 21,000.00
0.0300 org Mandor @ Rp. 47,500.00 1,425.00
JUMLAH ( BELUM PPN ) 116,925.00
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Membuat listplank asbes plat ram kayu jati lokal


0.0250 m3 Ram kayu jati lokal @ Rp. 16,500,000.00
1.0000 m2 Asbes plat @ Rp. 10,000.00
0.3000 kg Paku reng @ Rp. 9,000.00
1.8000 org Tukang kayu @ Rp. 47,500.00 85,500.00
0.1800 org Kep. Tk. Kayu @ Rp. 50,000.00 9,000.00
0.6000 org Pekerja @ Rp. 35,000.00 21,000.00
0.0300 org Mandor @ Rp. 47,500.00 1,425.00
JUMLAH ( BELUM PPN ) 116,925.00
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Membuat listplank asbes plat ram kayu kamper


0.0250 m3 Ram kayu kamper @ Rp. 9,250,000.00
1.0000 m2 Asbes plat @ Rp. 10,000.00
0.3000 kg Paku reng @ Rp. 9,000.00
1.8000 org Tukang kayu @ Rp. 47,500.00 85,500.00
0.1800 org Kep. Tk. Kayu @ Rp. 50,000.00 9,000.00
0.6000 org Pekerja @ Rp. 35,000.00 21,000.00
0.0300 org Mandor @ Rp. 47,500.00 1,425.00
JUMLAH ( BELUM PPN ) 116,925.00
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Membuat listplank asbes plat ram kayu kruing


0.0250 m3 Ram kayu kruing @ Rp. 4,350,000.00
1.0000 m 2
Asbes plat @ Rp. 10,000.00
0.3000 kg Paku reng @ Rp. 9,000.00
1.8000 org Tukang kayu @ Rp. 47,500.00 85,500.00
0.1800 org Kep. Tk. Kayu @ Rp. 50,000.00 9,000.00
0.6000 org Pekerja @ Rp. 35,000.00 21,000.00
0.0300 org Mandor @ Rp. 47,500.00 1,425.00
JUMLAH ( BELUM PPN ) 116,925.00

Analisa Gedung - 165


No. Macam Pekerjaan Upah
(1) (2) (3)
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m2 Membuat listplank asbes plat ram kayu bengkirai


0.0250 m3 Ram kayu bengkirai @ Rp. 7,800,000.00
1.0000 m2 Asbes plat @ Rp. 10,000.00
0.3000 kg Paku reng @ Rp. 9,000.00
1.8000 org Tukang kayu @ Rp. 47,500.00 85,500.00
0.1800 org Kep. Tk. Kayu @ Rp. 50,000.00 9,000.00
0.6000 org Pekerja @ Rp. 35,000.00 21,000.00
0.0300 org Mandor @ Rp. 47,500.00 1,425.00
JUMLAH ( BELUM PPN ) 116,925.00
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 166


No. Macam Pekerjaan Upah
(1) (2) (3)

1.0000 m1 Mengerjakan papan ruiter kayu jati 2/20


0.0040 m3 Kayu jati papan @ Rp. 22,000,000.00
0.0200 kg Paku biasa 2" - 5" @ Rp. 9,000.00
0.0800 org Tukang kayu @ Rp. 47,500.00 3,800.00
0.0080 org Kepala tukang kayu @ Rp. 50,000.00 400.00
0.0280 org Pekerja @ Rp. 35,000.00 980.00
0.0014 org Mandor @ Rp. 47,500.00 66.50
JUMLAH 5,246.50
JASA 10 %
JUMLAH
DIBULATKAN

1.0000 m1 Mengerjakan papan ruiter kayu jati lokal 2/20


0.0040 m3 Papan kayu jati lokal @ Rp. 18,700,000.00
0.0200 kg Paku biasa 2" - 5" @ Rp. 9,000.00
0.0800 org Tukang kayu @ Rp. 47,500.00 3,800.00
0.0080 org Kepala tukang kayu @ Rp. 50,000.00 400.00
0.0280 org Pekerja @ Rp. 35,000.00 980.00
0.0014 org Mandor @ Rp. 47,500.00 66.50
JUMLAH 5,246.50
JASA 10 %
JUMLAH
DIBULATKAN

1.0000 m1 Mengerjakan papan ruiter kayu kamper 2/20


0.0040 m3 Kayu kamper papan @ Rp. 8,000,000.00
0.0200 kg Paku biasa 2" - 5" @ Rp. 9,000.00
0.0800 org Tukang kayu @ Rp. 47,500.00 3,800.00
0.0080 org Kepala tukang kayu @ Rp. 50,000.00 400.00
0.0280 org Pekerja @ Rp. 35,000.00 980.00
0.0014 org Mandor @ Rp. 47,500.00 66.50
JUMLAH 5,246.50
JASA 10 %
JUMLAH
DIBULATKAN

1.0000 m1 Mengerjakan papan ruiter kayu kruing 2/20


0.0040 m3 Kayu kruing papan @ Rp. 4,750,000.00
0.0200 kg Paku biasa 2" - 5" @ Rp. 9,000.00
0.0800 org Tukang kayu @ Rp. 47,500.00 3,800.00
0.0080 org Kepala tukang kayu @ Rp. 50,000.00 400.00
0.0280 org Pekerja @ Rp. 35,000.00 980.00
0.0014 org Mandor @ Rp. 47,500.00 66.50
JUMLAH 5,246.50
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 167


No. Macam Pekerjaan Upah
(1) (2) (3)
1.0000 m1 Mengerjakan papan ruiter kayu bengkirai 2/20
0.0040 m3 Kayu bengkirai papan @ Rp. 8,200,000.00
0.0200 kg Paku biasa 2" - 5" @ Rp. 9,000.00
0.0800 org Tukang kayu @ Rp. 47,500.00 3,800.00
0.0080 org Kepala tukang kayu @ Rp. 50,000.00 400.00
0.0280 org Pekerja @ Rp. 35,000.00 980.00
0.0014 org Mandor @ Rp. 47,500.00 66.50
JUMLAH 5,246.50
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 168


No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m1 Pasang talang datar, seng BJLS 28, papan kayu jati
6.18 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00
0.0150 kg Paku biasa 1/2" - 1" @ Rp. 9,000.00
0.0096 m3 Kayu jati papan @ Rp. 22,000,000.00
0.2500 kg Flincoat @ Rp. 35,000.00
0.4000 org Tukang kayu @ Rp. 47,500.00 19,000.00
0.0250 org Kepala tukang kayu @ Rp. 50,000.00 1,250.00
0.1500 org Pekerja @ Rp. 35,000.00 5,250.00
0.0013 org Mandor @ Rp. 47,500.00 59.38
JUMLAH ( BELUM PPN ) 25,559.38
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m1 Pasang talang datar, seng BJLS 28, papan kayu jati lokal
6.18 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00
0.0150 kg Paku biasa 1/2" - 1" @ Rp. 9,000.00
0.0096 m3 Kayu jati lokal papan @ Rp. 18,700,000.00
0.2500 kg Flincoat @ Rp. 35,000.00
0.4000 org Tukang kayu @ Rp. 47,500.00 19,000.00
0.0250 org Kepala tukang kayu @ Rp. 50,000.00 1,250.00
0.1500 org Pekerja @ Rp. 35,000.00 5,250.00
0.0013 org Mandor @ Rp. 47,500.00 59.38
JUMLAH ( BELUM PPN ) 25,559.38
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m1 Pasang talang datar, seng BJLS 28, papan kayu kamper
6.18 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00
0.0150 kg Paku biasa 1/2" - 1" @ Rp. 9,000.00
0.0096 m3 Kayu kamper papan @ Rp. 8,000,000.00
0.2500 kg Flincoat @ Rp. 35,000.00
0.4000 org Tukang kayu @ Rp. 47,500.00 19,000.00
0.0250 org Kepala tukang kayu @ Rp. 50,000.00 1,250.00
0.1500 org Pekerja @ Rp. 35,000.00 5,250.00
0.0013 org Mandor @ Rp. 47,500.00 59.38
JUMLAH ( BELUM PPN ) 25,559.38
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m1 Pasang talang datar, seng BJLS 28, papan kayu kruing
6.18 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00
0.0150 kg Paku biasa 1/2" - 1" @ Rp. 9,000.00
0.0096 m3 Kayu kruing papan @ Rp. 4,750,000.00
0.2500 kg Flincoat @ Rp. 35,000.00
0.4000 org Tukang kayu @ Rp. 47,500.00 19,000.00
0.0250 org Kepala tukang kayu @ Rp. 50,000.00 1,250.00

Analisa Gedung - 169


No. Macam Pekerjaan Upah
(1) (2) (3)
0.1500 org Pekerja @ Rp. 35,000.00 5,250.00
0.0013 org Mandor @ Rp. 47,500.00 59.38
JUMLAH ( BELUM PPN ) 25,559.38
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 170


No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m1 Pasang talang datar, seng BJLS 28, papan kayu bengkirai
6.18 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00
0.0150 kg Paku biasa 1/2" - 1" @ Rp. 9,000.00
0.0096 m3 Kayui bengkirai papan @ Rp. 8,200,000.00
0.2500 kg Flincoat @ Rp. 35,000.00
0.4000 org Tukang kayu @ Rp. 47,500.00 19,000.00
0.0250 org Kepala tukang kayu @ Rp. 50,000.00 1,250.00
0.1500 org Pekerja @ Rp. 35,000.00 5,250.00
0.0013 org Mandor @ Rp. 47,500.00 59.38
JUMLAH ( BELUM PPN ) 25,559.38
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m1 Pasang talang miring, seng BJLS 28 papan kayu jati
6.19 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00
0.0150 kg Paku biasa 1/2" - 1" @ Rp. 9,000.00
0.0190 m3 Kayu jati papan @ Rp. 22,000,000.00
0.3000 kg Flincoat @ Rp. 35,000.00
0.4000 org Tukang kayu @ Rp. 47,500.00 19,000.00
0.0250 org Kepala tukang kayu @ Rp. 50,000.00 1,250.00
0.0400 org Pekerja @ Rp. 35,000.00 1,400.00
0.0013 org Mandor @ Rp. 47,500.00 59.38
JUMLAH ( BELUM PPN ) 21,709.38
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m1 Pasang talang miring, seng BJLS 28, papan kayu jati lokal
6.19 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00
0.0150 kg Paku biasa 1/2" - 1" @ Rp. 9,000.00
0.0190 m3 Kayu jati lokal papan @ Rp. 18,700,000.00
0.2500 kg Flincoat @ Rp. 35,000.00
0.4000 org Tukang kayu @ Rp. 47,500.00 19,000.00
0.0250 org Kepala tukang kayu @ Rp. 50,000.00 1,250.00
0.0400 org Pekerja @ Rp. 35,000.00 1,400.00
0.0013 org Mandor @ Rp. 47,500.00 59.38
JUMLAH ( BELUM PPN ) 21,709.38
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m1 Pasang talang miring, seng BJLS 28, papan kayu kamper
6.19 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00
0.0150 kg Paku biasa 1/2" - 1" @ Rp. 9,000.00
0.0190 m3 Kayu kamper papan @ Rp. 8,000,000.00
0.2500 kg Flincoat @ Rp. 35,000.00
0.4000 org Tukang kayu @ Rp. 47,500.00 19,000.00
0.0250 org Kepala tukang kayu @ Rp. 50,000.00 1,250.00

Analisa Gedung - 171


No. Macam Pekerjaan Upah
(1) (2) (3)
0.0400 org Pekerja @ Rp. 35,000.00 1,400.00
0.0013 org Mandor @ Rp. 47,500.00 59.38
JUMLAH ( BELUM PPN ) 21,709.38
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 172


No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m1 Pasang talang miring, seng BJLS 28, papan kayu kruing
6.19 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00
0.0150 kg Paku biasa 1/2" - 1" @ Rp. 9,000.00
0.0190 m3 Kayu kruing papan @ Rp. 4,750,000.00
0.2500 kg Flincoat @ Rp. 35,000.00
0.4000 org Tukang kayu @ Rp. 47,500.00 19,000.00
0.0250 org Kepala tukang kayu @ Rp. 50,000.00 1,250.00
0.0400 org Pekerja @ Rp. 35,000.00 1,400.00
0.0013 org Mandor @ Rp. 47,500.00 59.38
JUMLAH ( BELUM PPN ) 21,709.38
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m1 Pasang talang miring, seng BJLS 28, papan kayu bengkirai
6.19 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00
0.0150 kg Paku biasa 1/2" - 1" @ Rp. 9,000.00
0.0190 m3 Kayu bengkirai papan @ Rp. 8,200,000.00
0.2500 kg Flincoat @ Rp. 35,000.00
0.4000 org Tukang kayu @ Rp. 47,500.00 19,000.00
0.0250 org Kepala tukang kayu @ Rp. 50,000.00 1,250.00
0.0400 org Pekerja @ Rp. 35,000.00 1,400.00
0.0013 org Mandor @ Rp. 47,500.00 59.38
JUMLAH ( BELUM PPN ) 21,709.38
JASA 10 %
JUMLAH
DIBULATKAN

H.18 10.0000 m1 Pasang talang torong


10.0000 m1 Seng BJLS 0,30 ( 60 cm ) @ Rp. 20,000.00
225.0000 bh Paku sumbat @ Rp. 400.00
3.7500 org Tukang besi @ Rp. 45,000.00 168,750.00
0.3750 org Kep. Tk. Besi @ Rp. 47,500.00 17,812.50
2.2500 org Pekerja @ Rp. 35,000.00 78,750.00
0.1100 org Mandor @ Rp. 47,500.00 5,225.00
JUMLAH ( BELUM PPN ) 270,537.50

TIAP 1M1 ( BELUM PPN ) 27,053.75


JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m1 Pasang talang ½ lingkaran D - 10 cm, seng BJLS 28


6.20 0.3000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00
0.1000 kg Paku biasa 1/2" - 1" @ Rp. 9,000.00
0.0190 m3 Kayu bengkirai papan @ Rp. 8,200,000.00
0.5000 kg Besi strip @ Rp. 12,500.00
0.2500 org Tukang kayu @ Rp. 47,500.00 11,875.00
0.0250 org Kepala tukang kayu @ Rp. 50,000.00 1,250.00

Analisa Gedung - 173


No. Macam Pekerjaan Upah
(1) (2) (3)
0.1500 org Pekerja @ Rp. 35,000.00 5,250.00
0.0013 org Mandor @ Rp. 47,500.00 59.38
JUMLAH ( BELUM PPN ) 18,434.38
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 174


No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m1 Pasang talang ½ lingkaran D - 10 cm, seng BJLS 24


6.21 0.3000 lbr Seng plat 3' x 6' BJLS 24 @ Rp. 38,500.00
0.1000 kg Paku biasa 1/2" - 1" @ Rp. 9,000.00
0.0190 m3 Kayu bengkirai papan @ Rp. 8,200,000.00
0.5000 kg Besi strip @ Rp. 12,500.00
0.2500 org Tukang kayu @ Rp. 47,500.00 11,875.00
0.0250 org Kepala tukang kayu @ Rp. 50,000.00 1,250.00
0.1500 org Pekerja @ Rp. 35,000.00 5,250.00
0.0013 org Mandor @ Rp. 47,500.00 59.38
JUMLAH ( BELUM PPN ) 18,434.38
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang rangka dinding pemisah, kayu kamper


03-3434-2002 0.0195 m3 Kayu kamper balok @ Rp. 9,250,000.00
6.54 0.0070 m3 Kayu kamper papan @ Rp. 8,000,000.00
0.1000 kg Paku biasa 2" - 5" @ Rp. 8,000.00
0.4500 org Tukang kayu @ Rp. 47,500.00 21,375.00
0.0450 org Kepala tukang kayu @ Rp. 50,000.00 2,250.00
0.1500 org Pekerja @ Rp. 35,000.00 5,250.00
0.0750 org Mandor @ Rp. 47,500.00 3,562.50
JUMLAH ( BELUM PPN ) 32,437.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang rangka dinding pemisah, kayu bengkirai


03-3434-2002 0.0195 m3 Kayu bengkirai balok @ Rp. 7,800,000.00
6.55 0.0070 m 3
Kayu bengkirai papan @ Rp. 8,200,000.00
0.1000 kg Paku biasa 2" - 5" @ Rp. 8,000.00
0.4500 org Tukang kayu @ Rp. 47,500.00 21,375.00
0.0450 org Kepala tukang kayu @ Rp. 50,000.00 2,250.00
0.1500 org Pekerja @ Rp. 35,000.00 5,250.00
0.0750 org Mandor @ Rp. 47,500.00 3,562.50
JUMLAH ( BELUM PPN ) 32,437.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang rangka dinding pemisah, kayu jati


03-3434-2002 0.0195 m3 Kayu jati balok @ Rp. 20,000,000.00
0.0070 m3 Kayu jati papan @ Rp. 22,000,000.00
0.1000 kg Paku biasa 2" - 5" @ Rp. 8,000.00
0.4500 org Tukang kayu @ Rp. 47,500.00 21,375.00
0.0450 org Kepala tukang kayu @ Rp. 50,000.00 2,250.00
0.1500 org Pekerja @ Rp. 35,000.00 5,250.00
0.0750 org Mandor @ Rp. 47,500.00 3,562.50

Analisa Gedung - 175


No. Macam Pekerjaan Upah
(1) (2) (3)
JUMLAH ( BELUM PPN ) 32,437.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang rangka dinding pemisah, kayu jati lokal


03-3434-2002 0.0195 m3 Kayu jati lokal balok @ Rp. 16,500,000.00
0.0070 m3 Kayu jati lokal papan @ Rp. 18,700,000.00
0.1000 kg Paku biasa 2" - 5" @ Rp. 8,000.00
0.4500 org Tukang kayu @ Rp. 47,500.00 21,375.00
0.0450 org Kepala tukang kayu @ Rp. 50,000.00 2,250.00
0.1500 org Pekerja @ Rp. 35,000.00 5,250.00
0.0750 org Mandor @ Rp. 47,500.00 3,562.50
JUMLAH ( BELUM PPN ) 32,437.50
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 176


No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m2 Pasang rangka dinding pemisah, kayu kruing


03-3434-2002 0.0195 m3 Kayu kruing balok @ Rp. 4,350,000.00
0.0070 m 3
Kayu kruing papan @ Rp. 4,750,000.00
0.1000 kg Paku biasa 2" - 5" @ Rp. 8,000.00
0.4500 org Tukang kayu @ Rp. 47,500.00 21,375.00
0.0450 org Kepala tukang kayu @ Rp. 50,000.00 2,250.00
0.1500 org Pekerja @ Rp. 35,000.00 5,250.00
0.0750 org Mandor @ Rp. 47,500.00 3,562.50
JUMLAH ( BELUM PPN ) 32,437.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang dinding pemisah teakwood rangkap, rangka kayu kamper
03-3434-2002 0.0195 m3 Kayu kamper balok @ Rp. 9,250,000.00
6.56 0.0070 m3 Kayu kamper papan @ Rp. 8,000,000.00
0.1000 kg Paku biasa 2" - 5" @ Rp. 8,000.00
0.5600 kg Lem kayu @ Rp. 11,000.00
1.0000 lbr Teakwood 4' x 8' x 4 mm @ Rp. 69,500.00
0.4500 org Tukang kayu @ Rp. 47,500.00 21,375.00
0.0450 org Kepala tukang kayu @ Rp. 50,000.00 2,250.00
0.1500 org Pekerja @ Rp. 35,000.00 5,250.00
0.0750 org Mandor @ Rp. 47,500.00 3,562.50
JUMLAH ( BELUM PPN ) 32,437.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang dinding pemisah plywoodwood rangkap, rangka kayu kamper
03-3434-2002 0.0195 m3 Kayu kamper balok @ Rp. 9,250,000.00
6.57 0.0070 m3 Kayu kamper papan @ Rp. 8,000,000.00
0.1000 kg Paku biasa 2" - 5" @ Rp. 8,000.00
0.5600 kg Lem kayu @ Rp. 11,000.00
1.0000 lbr Plywood 4' x 8' x 4 mm @ Rp. 41,250.00
0.6000 org Tukang kayu @ Rp. 47,500.00 28,500.00
0.0600 org Kepala tukang kayu @ Rp. 50,000.00 3,000.00
0.2000 org Pekerja @ Rp. 35,000.00 7,000.00
0.0100 org Mandor @ Rp. 47,500.00 475.00
JUMLAH ( BELUM PPN ) 38,975.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang plywood tebal 4 mm, untuk dinding


03-3434-2002 0.4000 lbr Plywood 4' x 8' x 4 mm @ Rp. 41,250.00
6.59 0.0500 kg Paku biasa 2" - 5" @ Rp. 8,000.00
0.0750 org Tukang kayu @ Rp. 47,500.00 3,562.50
0.0075 org Kepala tukang kayu @ Rp. 50,000.00 375.00

Analisa Gedung - 177


No. Macam Pekerjaan Upah
(1) (2) (3)
0.0250 org Pekerja @ Rp. 35,000.00 875.00
0.0013 org Mandor @ Rp. 47,500.00 61.75
JUMLAH ( BELUM PPN ) 4,874.25
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 178


No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m2 Pasang dinding anyaman bambu, rangka kayu kruing


03-2837-2002 1.5000 m2 Bilik bambu @ Rp. 65,000.00
6.27 0.0140 m Kayu 5/7 kruing
3
@ Rp. 4,350,000.00
0.1200 m3 Pasir pasang @ Rp. 145,000.00
0.0030 m3 List kayu 2/4 kruing @ Rp. 4,350,000.00
0.0500 org Tukang kayu @ Rp. 47,500.00 2,375.00
0.0050 org Kepala tukang kayu @ Rp. 50,000.00 250.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0020 org Mandor @ Rp. 47,500.00 95.00
JUMLAH ( BELUM PPN ) 6,220.00
JASA 10 %
JUMLAH
DIBULATKAN

PEKERJAAN ATAP

H.2 1.0000 m2 Pasang genteng press


25.0000 bh Genteng press @ Rp. 1,100.00
0.1000 org Tukang batu @ Rp. 45,000.00 4,500.00
0.0100 org Kep. Tk. Batu @ Rp. 47,500.00 475.00
0.2000 org Pekerja @ Rp. 35,000.00 7,000.00
0.0100 org Mandor @ Rp. 47,500.00 475.00
JUMLAH ( BELUM PPN ) 12,450.00
JASA 10 %
JUMLAH
DIBULATKAN

H.2A 1.0000 m2 Pasang genteng paris untuk rumah tingkat


25.0000 bh Genteng paris @ Rp. 1,100.00
0.1000 org Tukang batu @ Rp. 45,000.00 4,500.00
0.0100 org Kep. Tk. Batu @ Rp. 47,500.00 475.00
0.3000 org Pekerja @ Rp. 35,000.00 10,500.00
0.0150 org Mandor @ Rp. 47,500.00 712.50
JUMLAH ( BELUM PPN ) 16,187.50
JASA 10 %
JUMLAH
DIBULATKAN

H.2A 1.0000 m2 Pasang genteng beton besar Natural ( isi 9 / m2 )


9.0000 bh Genteng beton natural @ Rp. 2,750.00
0.1000 org Tukang batu @ Rp. 45,000.00 4,500.00
0.0100 org Kep. Tk. Batu @ Rp. 47,500.00 475.00
0.2000 org Pekerja @ Rp. 35,000.00 7,000.00
0.0100 org Mandor @ Rp. 47,500.00 475.00
JUMLAH ( BELUM PPN ) 12,450.00
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 179


No. Macam Pekerjaan Upah
(1) (2) (3)
H.2A 1.0000 m2 Pasang genteng beton besar Natural ( isi 9 / m2 ) untuk rumah tingkat
9.0000 bh Genteng beton natural @ Rp. 2,750.00
0.1000 org Tukang batu @ Rp. 45,000.00 4,500.00
0.0100 org Kep. Tk. Batu @ Rp. 47,500.00 475.00
0.3000 org Pekerja @ Rp. 35,000.00 10,500.00
0.0150 org Mandor @ Rp. 47,500.00 712.50
JUMLAH ( BELUM PPN ) 16,187.50
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 180


No. Macam Pekerjaan Upah
(1) (2) (3)

H.2A 1.0000 m2 Pasang genteng beton besar Warna ( isi 9 / m2 )


9.0000 bh Genteng beton Warna @ Rp. 4,420.00
0.1000 org Tukang batu @ Rp. 45,000.00 4,500.00
0.0100 org Kep. Tk. Batu @ Rp. 47,500.00 475.00
0.2000 org Pekerja @ Rp. 35,000.00 7,000.00
0.0100 org Mandor @ Rp. 47,500.00 475.00
JUMLAH ( BELUM PPN ) 12,450.00
JASA 10 %
JUMLAH
DIBULATKAN

H.2A 1.0000 m2 Pasang genteng beton besar Warna ( isi 9 / m2 ) untuk rumah tingkat
9.0000 bh Genteng beton Warna @ Rp. 4,420.00
0.1000 org Tukang batu @ Rp. 45,000.00 4,500.00
0.0100 org Kep. Tk. Batu @ Rp. 47,500.00 475.00
0.3000 org Pekerja @ Rp. 35,000.00 10,500.00
0.0150 org Mandor @ Rp. 47,500.00 712.50
JUMLAH ( BELUM PPN ) 16,187.50
JASA 10 %
JUMLAH
DIBULATKAN

H.2A 1.0000 m2 Pasang genteng keramik berglasir KIA, Kanmuri Natural


14.5000 bh Genteng keramik KIA natural @ Rp. 4,500.00
0.1000 org Tukang batu @ Rp. 45,000.00 4,500.00
0.0100 org Kep. Tk. Batu @ Rp. 47,500.00 475.00
0.2000 org Pekerja @ Rp. 35,000.00 7,000.00
0.0100 org Mandor @ Rp. 47,500.00 475.00
JUMLAH ( BELUM PPN ) 12,450.00
JASA 10 %
JUMLAH
DIBULATKAN

H.2A 1.0000 m2 Pasang genteng keramik berglasir KIA, Kanmuri Natural untuk rumah tingkat
14.5000 bh Genteng beton natural @ Rp. 4,500.00
0.1000 org Tukang batu @ Rp. 45,000.00 4,500.00
0.0100 org Kep. Tk. Batu @ Rp. 47,500.00 475.00
0.3000 org Pekerja @ Rp. 35,000.00 10,500.00
0.0150 org Mandor @ Rp. 47,500.00 712.50
JUMLAH ( BELUM PPN ) 16,187.50
JASA 10 %
JUMLAH
DIBULATKAN

H.6 1.0000 m1 Pasang bubungan genteng paris


5.0000 bh Bubungan genteng paris @ Rp. 1,650.00
0.0152 m3 Kapur pasang @ Rp. 72,500.00
0.0152 m Pasir pasang
3
@ Rp. 145,000.00
1.5240 kg PC @ Rp. 1,196.00

Analisa Gedung - 181


No. Macam Pekerjaan Upah
(1) (2) (3)
0.2000 org Tukang batu @ Rp. 45,000.00 9,000.00
0.0200 org Kep. Tk. Batu @ Rp. 47,500.00 950.00
0.4000 org Pekerja @ Rp. 35,000.00 14,000.00
0.0200 org Mandor @ Rp. 47,500.00 950.00
JUMLAH ( BELUM PPN ) 24,900.00
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 182


No. Macam Pekerjaan Upah
(1) (2) (3)

H.6 1.0000 m1 Pasang bubungan genteng beton Natural


5.0000 bh Bubungan genteng beton natural @ Rp. 2,460.00
0.0152 m3 Kapur pasang @ Rp. 72,500.00
0.0152 m 3
Pasir pasang @ Rp. 145,000.00
1.5240 kg PC @ Rp. 1,196.00
0.2000 org Tukang batu @ Rp. 45,000.00 9,000.00
0.0200 org Kep. Tk. Batu @ Rp. 47,500.00 950.00
0.4000 org Pekerja @ Rp. 35,000.00 14,000.00
0.0200 org Mandor @ Rp. 47,500.00 950.00
JUMLAH ( BELUM PPN ) 24,900.00
JASA 10 %
JUMLAH
DIBULATKAN

H.6 1.0000 m1 Pasang bubungan genteng beton Warna


4.0000 bh Bubungan genteng beton warna @ Rp. 4,260.00
0.0152 m3 Kapur pasang @ Rp. 72,500.00
0.0152 m3 Pasir pasang @ Rp. 145,000.00
1.5240 kg PC @ Rp. 1,196.00
0.2000 org Tukang batu @ Rp. 45,000.00 9,000.00
0.0200 org Kep. Tk. Batu @ Rp. 47,500.00 950.00
0.4000 org Pekerja @ Rp. 35,000.00 14,000.00
0.0200 org Mandor @ Rp. 47,500.00 950.00
JUMLAH ( BELUM PPN ) 24,900.00
JASA 10 %
JUMLAH
DIBULATKAN

H.6 1.0000 m1 Pasang bubungan genteng keramik berglasir KIA, Kanmuri Natural
4.0000 bh Bubungan gent.krmk KIA natural @ Rp. 13,500.00
0.0152 m3 Kapur pasang @ Rp. 72,500.00
0.0152 m3 Pasir pasang @ Rp. 145,000.00
1.5240 kg PC @ Rp. 1,196.00
0.2000 org Tukang batu @ Rp. 45,000.00 9,000.00
0.0200 org Kep. Tk. Batu @ Rp. 47,500.00 950.00
0.4000 org Pekerja @ Rp. 35,000.00 14,000.00
0.0200 org Mandor @ Rp. 47,500.00 950.00
JUMLAH ( BELUM PPN ) 24,900.00
JASA 10 %
JUMLAH
DIBULATKAN

1.0000 m2 Pasang atap asbes gelombang (2,5 x 0,92 m) x 5 mm


SNI 0.5000 lbr Asbes gelombang @ Rp. 62,960.00
6.8 0.1200 kg Paku pancing 60 x 230 @ Rp. 9,350.00
03-3436-2002 0.0750 org Tukang kayu @ Rp. 47,500.00 3,562.50
0.0080 org Kepala tukang kayu @ Rp. 50,000.00 400.00
0.1400 org Pekerja @ Rp. 35,000.00 4,900.00

Analisa Gedung - 183


No. Macam Pekerjaan Upah
(1) (2) (3)
0.0080 org Mandor @ Rp. 47,500.00 380.00
JUMLAH ( BELUM PPN ) 9,242.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang atap sbes gelombang (2,25 x 0,92 m) x 5 mm


6.9 0.6000 lbr Asbes gelombang @ Rp. 56,620.00
03-3436-2002 0.1200 kg Paku pancing 60 x 230 @ Rp. 9,350.00
0.0750 org Tukang kayu @ Rp. 47,500.00 3,562.50
0.0080 org Kepala tukang kayu @ Rp. 50,000.00 400.00
0.1400 org Pekerja @ Rp. 35,000.00 4,900.00
0.0080 org Mandor @ Rp. 47,500.00 380.00
JUMLAH ( BELUM PPN ) 9,242.50
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 184


No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m2 Pasang atap asbes gelombang (2,00 x 0,92 m) x 5 mm


6.10 0.6000 lbr Asbes gelombang @ Rp. 50,330.00
03-3436-2002 0.1200 kg Paku pancing 60 x 230 @ Rp. 9,350.00
0.0700 org Tukang kayu @ Rp. 47,500.00 3,325.00
0.0070 org Kepala tukang kayu @ Rp. 50,000.00 350.00
0.1400 org Pekerja @ Rp. 35,000.00 4,900.00
0.0070 org Mandor @ Rp. 47,500.00 332.50
JUMLAH ( BELUM PPN ) 8,907.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang atap asbes gelombang (1,80 x 0,92 m) x 5 mm


6.11 0.7500 lbr Asbes gelombang @ Rp. 45,290.00
03-3436-2002 0.1200 kg Paku pancing 60 x 230 @ Rp. 9,350.00
0.0700 org Tukang kayu @ Rp. 47,500.00 3,325.00
0.0070 org Kepala tukang kayu @ Rp. 50,000.00 350.00
0.1400 org Pekerja @ Rp. 35,000.00 4,900.00
0.0070 org Mandor @ Rp. 47,500.00 332.50
JUMLAH ( BELUM PPN ) 8,907.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang atap asbes gelombang (300 x 1,05 m) x 4 mm


6.12 0.3500 lbr Asbes gelombang @ Rp. 71,350.00
03-3436-2002 0.1200 kg Paku pancing 60 x 230 @ Rp. 9,350.00
0.0700 org Tukang kayu @ Rp. 47,500.00 3,325.00
0.0070 org Kepala tukang kayu @ Rp. 50,000.00 350.00
0.1400 org Pekerja @ Rp. 35,000.00 4,900.00
0.0070 org Mandor @ Rp. 47,500.00 332.50
JUMLAH ( BELUM PPN ) 8,907.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang atap asbes gelombang (2,7 x 1,05 m) x 4 mm


6.13 0.4200 lbr Asbes gelombang @ Rp. 69,250.00
03-3436-2002 0.1200 kg Paku pancing 60 x 230 @ Rp. 9,350.00
0.0700 org Tukang kayu @ Rp. 47,500.00 3,325.00
0.0070 org Kepala tukang kayu @ Rp. 50,000.00 350.00
0.1400 org Pekerja @ Rp. 35,000.00 4,900.00
0.0070 org Mandor @ Rp. 47,500.00 332.50
JUMLAH ( BELUM PPN ) 8,907.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang atap asbes gelombang (2,40 x 1,05 m) x 4 mm

Analisa Gedung - 185


No. Macam Pekerjaan Upah
(1) (2) (3)
6.14 0.4400 lbr Asbes gelombang @ Rp. 61,000.00
03-3436-2002 0.1200 kg Paku pancing 60 x 230 @ Rp. 9,350.00
0.0670 org Tukang kayu @ Rp. 47,500.00 3,182.50
0.0070 org Kepala tukang kayu @ Rp. 50,000.00 350.00
0.1400 org Pekerja @ Rp. 35,000.00 4,900.00
0.0070 org Mandor @ Rp. 47,500.00 332.50
JUMLAH ( BELUM PPN ) 8,765.00
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 186


No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m2 Pasang atap asbes gelombang (2,10 x 1,05 m) x 4 mm


6.15 0.5100 lbr Asbes gelombang @ Rp. 57,500.00
03-3436-2002 0.1200 kg Paku pancing 60 x 230 @ Rp. 9,350.00
0.0670 org Tukang kayu @ Rp. 47,500.00 3,182.50
0.0070 org Kepala tukang kayu @ Rp. 50,000.00 350.00
0.1400 org Pekerja @ Rp. 35,000.00 4,900.00
0.0070 org Mandor @ Rp. 47,500.00 332.50
JUMLAH ( BELUM PPN ) 8,765.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang atap asbes gelombang (1,50 x 1,05 m) x 4 mm


6.16 0.8000 lbr Asbes gelombang @ Rp. 35,950.00
03-3436-2002 0.1200 kg Paku pancing 60 x 230 @ Rp. 9,350.00
0.0670 org Tukang kayu @ Rp. 47,500.00 3,182.50
0.0070 org Kepala tukang kayu @ Rp. 50,000.00 350.00
0.1400 org Pekerja @ Rp. 35,000.00 4,900.00
0.0070 org Mandor @ Rp. 47,500.00 332.50
JUMLAH ( BELUM PPN ) 8,765.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang atap asbes gelombang (3,00 x 1,08 m) x 6 mm


6.17 0.3700 lbr Asbes gelombang @ Rp. 112,830.00
03-3436-2002 0.1200 kg Paku pancing 60 x 230 @ Rp. 9,350.00
0.0670 org Tukang kayu @ Rp. 47,500.00 3,182.50
0.0070 org Kepala tukang kayu @ Rp. 50,000.00 350.00
0.1400 org Pekerja @ Rp. 35,000.00 4,900.00
0.0070 org Mandor @ Rp. 47,500.00 332.50
JUMLAH ( BELUM PPN ) 8,765.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang atap asbes gelombang (2,70 x 1,08 m) x 6 mm


6.18 0.3800 lbr Asbes gelombang @ Rp. 101,500.00
03-3436-2002 0.1200 kg Paku pancing 60 x 230 @ Rp. 9,350.00
0.0670 org Tukang kayu @ Rp. 47,500.00 3,182.50
0.0070 org Kepala tukang kayu @ Rp. 50,000.00 350.00
0.1400 org Pekerja @ Rp. 35,000.00 4,900.00
0.0070 org Mandor @ Rp. 47,500.00 332.50
JUMLAH ( BELUM PPN ) 8,765.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang atap sbes gelombang (2,40 x 1,08 m) x 6 mm

Analisa Gedung - 187


No. Macam Pekerjaan Upah
(1) (2) (3)
6.19 0.4600 lbr Asbes gelombang @ Rp. 90,265.00
03-3436-2002 0.1200 kg Paku pancing 60 x 230 @ Rp. 9,350.00
0.0670 org Tukang kayu @ Rp. 47,500.00 3,182.50
0.0070 org Kepala tukang kayu @ Rp. 50,000.00 350.00
0.1400 org Pekerja @ Rp. 35,000.00 4,900.00
0.0070 org Mandor @ Rp. 47,500.00 332.50
JUMLAH ( BELUM PPN ) 8,765.00
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 188


No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m2 Pasang atap asbes gelombang (2,10 x 1,08 m) x 6 mm


6.20 0.4900 lbr Asbes gelombang @ Rp. 78,980.00
03-3436-2002 0.1200 kg Paku pancing 60 x 230 @ Rp. 9,350.00
0.0670 org Tukang kayu @ Rp. 47,500.00 3,182.50
0.0070 org Kepala tukang kayu @ Rp. 50,000.00 350.00
0.1400 org Pekerja @ Rp. 35,000.00 4,900.00
0.0070 org Mandor @ Rp. 47,500.00 332.50
JUMLAH ( BELUM PPN ) 8,765.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang atap asbes gelombang (1,80 x 1,08 m) x 6 mm


6.21 0.5700 lbr Asbes gelombang @ Rp. 67,690.00
03-3436-2002 0.1200 kg Paku pancing 60 x 230 @ Rp. 9,350.00
0.0670 org Tukang kayu @ Rp. 47,500.00 3,182.50
0.0070 org Kepala tukang kayu @ Rp. 50,000.00 350.00
0.1400 org Pekerja @ Rp. 35,000.00 4,900.00
0.0070 org Mandor @ Rp. 47,500.00 332.50
JUMLAH ( BELUM PPN ) 8,765.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m1 Pasang bubung stel gelombang 0,92 m


6.22 2.4000 lbr Bubung stel gelombang @ Rp. 29,000.00
03-3436-2002 6.0000 bh Paku sekrup 3,5" @ Rp. 750.00
0.1250 org Tukang kayu @ Rp. 47,500.00 5,937.50
0.0130 org Kepala tukang kayu @ Rp. 50,000.00 650.00
0.0840 org Pekerja @ Rp. 35,000.00 2,940.00
0.0040 org Mandor @ Rp. 47,500.00 190.00
JUMLAH ( BELUM PPN ) 9,717.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m1 Pasang nok stel gelombang 1,05 m


6.23 2.1000 lbr Nok stel gelombang @ Rp. 29,000.00
03-3436-2002 6.0000 bh Paku sekrup 3,5" @ Rp. 750.00
0.1250 org Tukang kayu @ Rp. 47,500.00 5,937.50
0.0130 org Kepala tukang kayu @ Rp. 50,000.00 650.00
0.0840 org Pekerja @ Rp. 35,000.00 2,940.00
0.0040 org Mandor @ Rp. 47,500.00 190.00
JUMLAH ( BELUM PPN ) 9,717.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m1 Pasang nok stel gelombang 1,08 m

Analisa Gedung - 189


No. Macam Pekerjaan Upah
(1) (2) (3)
6.24 2.0500 lbr Nok stel gelombang @ Rp. 29,000.00
03-3436-2002 6.0000 bh Paku sekrup 3,5" @ Rp. 750.00
0.1250 org Tukang kayu @ Rp. 47,500.00 5,937.50
0.0130 org Kepala tukang kayu @ Rp. 50,000.00 650.00
0.0840 org Pekerja @ Rp. 35,000.00 2,940.00
0.0040 org Mandor @ Rp. 47,500.00 190.00
JUMLAH ( BELUM PPN ) 9,717.50
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 190


No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m1 Pasang nok paten 0,92 m


6.25 1.2000 lbr Nok paten @ Rp. 50,000.00
03-3436-2002 6.0000 bh Paku sekrup 3,5" @ Rp. 750.00
0.1250 org Tukang kayu @ Rp. 47,500.00 5,937.50
0.0130 org Kepala tukang kayu @ Rp. 50,000.00 650.00
0.0840 org Pekerja @ Rp. 35,000.00 2,940.00
0.0040 org Mandor @ Rp. 47,500.00 190.00
JUMLAH ( BELUM PPN ) 9,717.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m1 Pasang nok paten 1,05 m


6.26 1.2000 lbr Nok paten @ Rp. 50,000.00
03-3436-2002 6.0000 bh Paku sekrup 3,5" @ Rp. 750.00
0.1250 org Tukang kayu @ Rp. 47,500.00 5,937.50
0.0130 org Kepala tukang kayu @ Rp. 50,000.00 650.00
0.0840 org Pekerja @ Rp. 35,000.00 2,940.00
0.0040 org Mandor @ Rp. 47,500.00 190.00
JUMLAH ( BELUM PPN ) 9,717.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m1 Pasang nok paten 1,08 m


6.27 1.2000 lbr Nok paten @ Rp. 50,000.00
03-3436-2002 6.0000 bh Paku sekrup 3,5" @ Rp. 750.00
0.1250 org Tukang kayu @ Rp. 47,500.00 5,937.50
0.0130 org Kepala tukang kayu @ Rp. 50,000.00 650.00
0.0840 org Pekerja @ Rp. 35,000.00 2,940.00
0.0040 org Mandor @ Rp. 47,500.00 190.00
JUMLAH ( BELUM PPN ) 9,717.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m1 Pasang nok stel rata 0,92 m


6.28 1.1000 lbr Nok stel rata @ Rp. 25,000.00
03-3436-2002 6.0000 bh Paku sekrup 3,5" @ Rp. 750.00
0.1500 org Tukang kayu @ Rp. 47,500.00 7,125.00
0.0130 org Kepala tukang kayu @ Rp. 50,000.00 650.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0040 org Mandor @ Rp. 47,500.00 190.00
JUMLAH ( BELUM PPN ) 11,465.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m1 Pasang nok stel rata 1,09 m

Analisa Gedung - 191


No. Macam Pekerjaan Upah
(1) (2) (3)
6.29 1.1000 lbr Nok stel rata @ Rp. 25,000.00
03-3436-2002 6.0000 bh Paku sekrup 3,5" @ Rp. 750.00
0.1250 org Tukang kayu @ Rp. 47,500.00 5,937.50
0.0130 org Kepala tukang kayu @ Rp. 50,000.00 650.00
0.0840 org Pekerja @ Rp. 35,000.00 2,940.00
0.0040 org Mandor @ Rp. 47,500.00 190.00
JUMLAH ( BELUM PPN ) 9,717.50
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 192


No. Macam Pekerjaan Upah
(1) (2) (3)

6.39 1.0000 m1 Pasang nok atap seng


0.3000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00
0.0400 kg Paku biasa 1/2" - 1" @ Rp. 11,000.00
0.0700 org Tukang kayu @ Rp. 47,500.00 3,325.00
0.0080 org Kepala tukang kayu @ Rp. 50,000.00 400.00
0.1500 org Pekerja @ Rp. 35,000.00 5,250.00
0.0060 org Mandor @ Rp. 47,500.00 285.00
JUMLAH ( BELUM PPN ) 9,260.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang atap genteng metal zinc alume type prima roof
03-3436-2002 1.0200 m2 Genteng metal @ Rp. 95,400.00
6.32 0.2000 kg Paku anti karat @ Rp. 20,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kepala tukang kayu @ Rp. 50,000.00 500.00
0.2000 org Pekerja @ Rp. 35,000.00 7,000.00
0.0010 org Mandor @ Rp. 47,500.00 47.50
JUMLAH ( BELUM PPN ) 12,297.50
JASA 10 %
JUMLAH
DIBULATKAN

Mod. SNI 1.0000 m2 Pasang atap metal gelombanmg


03-3436-2002 1.0200 m2 Atap metal gelombang t 3,5 mm @ Rp. 60,000.00
6.32 4.0000 bh Paku/skrup atap anti karat @ Rp. 1,200.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kepala tukang kayu @ Rp. 50,000.00 500.00
0.2000 org Pekerja @ Rp. 35,000.00 7,000.00
0.0010 org Mandor @ Rp. 47,500.00 47.50
JUMLAH ( BELUM PPN ) 12,297.50
JASA 10 %
JUMLAH
DIBULATKAN

6.36 1.0000 m1 Pasang nok genteng metal U type prima roof


1.1000 bh Nok metal @ Rp. 35,000.00
0.0500 kg Paku anti karat @ Rp. 20,000.00
0.1500 org Tukang kayu @ Rp. 47,500.00 7,125.00
0.0150 org Kepala tukang kayu @ Rp. 50,000.00 750.00
0.2500 org Pekerja @ Rp. 35,000.00 8,750.00
0.0130 org Mandor @ Rp. 47,500.00 617.50
JUMLAH ( BELUM PPN ) 17,242.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang atap alumunium

Analisa Gedung - 193


No. Macam Pekerjaan Upah
(1) (2) (3)
03-3436-2002 1.0500 m2 Atap alumunium gelombang tebal @ Rp. 45,000.00
6.40 0.0200 kg Paku hak panjang 15 cm @ Rp. 9,500.00
0.3750 org Tukang kayu @ Rp. 47,500.00 17,812.50
0.0080 org Kepala tukang kayu @ Rp. 50,000.00 400.00
0.1500 org Pekerja @ Rp. 35,000.00 5,250.00
0.0060 org Mandor @ Rp. 47,500.00 285.00
JUMLAH ( BELUM PPN ) 23,747.50
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 194


No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m1 Pasang nok alumunium


03-3436-2002 1.2000 m1 Nok standar 40 cm 18 SWG 22 @ Rp. 25,000.00
6.41 0.0400 kg Paku hak panjang 15 cm @ Rp. 9,500.00
1.0000 org Tukang kayu @ Rp. 47,500.00 47,500.00
0.0100 org Kepala tukang kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0100 org Mandor @ Rp. 47,500.00 475.00
JUMLAH ( BELUM PPN ) 51,975.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang alumunium foil / sisalation


03-3436-2002 1.0500 m2 Sisalation / alumunium foil @ Rp. 25,000.00
6.42 0.0500 org Tukang kayu @ Rp. 47,500.00 2,375.00
0.0050 org Kepala tukang kayu @ Rp. 50,000.00 250.00
0.1500 org Pekerja @ Rp. 35,000.00 5,250.00
0.0080 org Mandor @ Rp. 47,500.00 380.00
JUMLAH ( BELUM PPN ) 8,255.00
JASA 10 %
JUMLAH
DIBULATKAN

Empiris 1.0000 m2 Pasang atap polikarbonat


1.0500 m2 Plykarbhonat @ Rp. 225,000.00
7.0000 kg Besi rangka @ Rp. 12,500.00
9.0000 bh Paku sekrup @ Rp. 1,200.00
0.5000 org Tukang besi @ Rp. 45,000.00 22,500.00
0.0500 org Kepala tukang besi @ Rp. 47,500.00 2,375.00
0.5000 org Pekerja @ Rp. 35,000.00 17,500.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 42,493.75
JASA 10 %
JUMLAH
DIBULATKAN

PEKERJAAN CAT-CATAN

K.9 10.0000 m2 Mengecat kerb 3 kali


4.2500 kg Cat emco @ Rp. 39,000.00
0.5700 ltr Minyak cat @ Rp. 10,000.00
3.0000 org Tukang cat @ Rp. 42,500.00 127,500.00
0.3000 org Kep. Tk. Cat @ Rp. 45,000.00 13,500.00
2.0000 org Pekerja @ Rp. 35,000.00 70,000.00
0.1000 org Mandor @ Rp. 47,500.00 4,750.00
215,750.00
TIAP 1 M2 ( 3 kali ) 21,575.00
JASA 10 %
JUMLAH

Analisa Gedung - 195


No. Macam Pekerjaan Upah
(1) (2) (3)
DIBULATKAN
TIAP 1 M2 ( 2 kali ) 14,383.33
JASA 10 %
JUMLAH
DIBULATKAN
TIAP 1 M2 ( 1 kali ) 7,191.67
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 196


No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m2 Mengikis / mengerok permukaan cat tembok lama


6.1 0.0500 kg Soda api @ Rp. 15,000.00
0.1500 org Pekerja @ Rp. 35,000.00 5,250.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 5,368.75
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Mengerok karat cat lama permukaan baja dengan cara manual
6.3 0.0500 kg Sabun @ Rp. 12,000.00
0.1500 org Pekerja @ Rp. 35,000.00 5,250.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 5,368.75
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Mendempul dan menggosok kayu


6.6 0.0800 kg Dempul jadi @ Rp. 10,000.00
0.0200 kg Minyak cat @ Rp. 10,000.00
0.0100 kg Batu apung @ Rp. 7,700.00
0.0400 org Tukang cat @ Rp. 42,500.00 1,700.00
0.0040 org Kepala tukang cat @ Rp. 45,000.00 180.00
0.0400 org Pekerja @ Rp. 35,000.00 1,400.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 3,398.75
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pengecatan bidang kayu lama


6.7 0.1500 kg Plamir @ Rp. 12,000.00
0.1700 kg Cat dasar @ Rp. 32,000.00
0.1700 kg Cat penutup @ Rp. 32,000.00
0.0750 org Tukang cat @ Rp. 42,500.00 3,187.50
0.0075 org Kepala tukang cat @ Rp. 45,000.00 337.50
0.0700 org Pekerja @ Rp. 35,000.00 2,450.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 6,093.75
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis cat penutup
6.8 0.2000 kg Cat meni @ Rp. 12,000.00
0.1500 kg Plamir @ Rp. 12,000.00
0.1700 kg Cat dasar @ Rp. 32,000.00
0.2600 kg Cat penutup @ Rp. 32,000.00

Analisa Gedung - 197


No. Macam Pekerjaan Upah
(1) (2) (3)
0.0900 org Tukang cat @ Rp. 42,500.00 3,825.00
0.0060 org Kepala tukang cat @ Rp. 45,000.00 270.00
0.0700 org Pekerja @ Rp. 35,000.00 2,450.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 6,663.75
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 198


No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m2 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 3 lapis cat penutup
6.9 0.2000 kg Cat meni @ Rp. 12,000.00
0.1500 kg Plamir @ Rp. 12,000.00
0.1700 kg Cat dasar @ Rp. 32,000.00
0.3500 kg Cat penutup @ Rp. 32,000.00
0.1050 org Tukang cat @ Rp. 42,500.00 4,462.50
0.0040 org Kepala tukang cat @ Rp. 45,000.00 180.00
0.0700 org Pekerja @ Rp. 35,000.00 2,450.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 7,211.25
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pelaburan bidang kayu dengan teak oil


6.10 0.3600 ltr Teak oil @ Rp. 27,500.00
0.0630 org Tukang cat @ Rp. 42,500.00 2,677.50
0.0630 org Kepala tukang cat @ Rp. 45,000.00 2,835.00
0.0400 org Pekerja @ Rp. 35,000.00 1,400.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 7,031.25
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pelaburan bidang kayu dengan politur


6.11 0.1500 ltr Politur @ Rp. 50,000.00
0.3720 ltr Politur jadi @ Rp. 50,000.00
2.0000 lbr Amplas @ Rp. 3,000.00
0.0600 org Tukang cat @ Rp. 42,500.00 2,550.00
0.0160 org Kepala tukang cat @ Rp. 45,000.00 720.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 3,388.75
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pelaburan bidang kayu dengan cat residu atau ter
6.12 0.3500 ltr Residu atau ter @ Rp. 3,500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0060 org Mandor @ Rp. 47,500.00 285.00
JUMLAH ( BELUM PPN ) 3,785.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pelaburan bidang kayu dengan vernis


6.13 0.1500 ltr Vernis @ Rp. 12,500.00
0.0500 kg Dempul @ Rp. 10,000.00

Analisa Gedung - 199


No. Macam Pekerjaan Upah
(1) (2) (3)
0.1000 lbr Amplas @ Rp. 3,000.00
0.0100 bh Kuas @ Rp. 8,000.00
0.1600 org Tukang cat @ Rp. 42,500.00 6,800.00
0.0160 org Kepala tukang cat @ Rp. 45,000.00 720.00
0.1600 org Pekerja @ Rp. 35,000.00 5,600.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 13,238.75
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 200


No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
6.14 0.1000 kg Plamir tembok @ Rp. 10,500.00
0.1000 kg Cat dasar @ Rp. 15,500.00
0.2600 kg Cat penutup 2 x @ Rp. 15,500.00
0.0630 org Tukang cat @ Rp. 42,500.00 2,677.50
0.0063 org Kepala tukang cat @ Rp. 45,000.00 283.50
0.0200 org Pekerja @ Rp. 35,000.00 700.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 3,779.75
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
6.15 0.1200 kg Cat dasar @ Rp. 15,500.00
0.1800 kg Cat penutup 2 x @ Rp. 15,500.00
0.0420 org Tukang cat @ Rp. 42,500.00 1,785.00
0.0042 org Kepala tukang cat @ Rp. 45,000.00 189.00
0.0280 org Pekerja @ Rp. 35,000.00 980.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 3,072.75
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pengecatan tembok tidak terlindung dari panas dan hujan
6.14 0.1000 kg Cat alkali resisting primer @ Rp. 27,200.00
0.3600 kg Cat ICI Weathershield @ Rp. 50,000.00
0.0630 org Tukang cat @ Rp. 42,500.00 2,677.50
0.0063 org Kepala tukang cat @ Rp. 45,000.00 283.50
0.0200 org Pekerja @ Rp. 35,000.00 700.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 3,779.75
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Melabur tembok dengan kalkarium


6.16 0.1000 kg Kalkarium @ Rp. 5,000.00
0.0420 org Tukang cat @ Rp. 42,500.00 1,785.00
0.0042 org Kepala tukang cat @ Rp. 45,000.00 189.00
0.0280 org Pekerja @ Rp. 35,000.00 980.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 3,072.75
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Melabur tembok dengan kapur sirih

Analisa Gedung - 201


No. Macam Pekerjaan Upah
(1) (2) (3)
6.17 0.1000 lbr Amplas @ Rp. 3,000.00
0.2500 ikat Alang-alang @ Rp. 500.00
0.0020 m3 Perancah kayu @ Rp. 500,000.00
0.1500 kg Kapur sirih @ Rp. 500.00
0.0010 org Tukang cat @ Rp. 42,500.00 42.50
0.0001 org Kepala tukang cat @ Rp. 45,000.00 4.50
0.1500 org Pekerja @ Rp. 35,000.00 5,250.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 5,415.75
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 202


No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m2 Melabur tembok tembok lama dengan kapur sirih (untuk pemeliharaan)
6.18 0.0020 m3 Perancah kayu @ Rp. 500,000.00
0.3000 kg Kapur sirih @ Rp. 500.00
0.0050 org Tukang cat @ Rp. 42,500.00 212.50
0.0005 org Kepala tukang cat @ Rp. 45,000.00 22.50
0.0400 org Pekerja @ Rp. 35,000.00 1,400.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 1,753.75
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pengecatan bidang besi ( 3 x )


6.9 0.1670 kg Cat meni besi @ Rp. 13,000.00
0.2000 kg Cat besi @ Rp. 39,000.00
0.1500 ltr Thinner @ Rp. 13,000.00
0.1050 org Tukang cat @ Rp. 42,500.00 4,462.50
0.0040 org Kepala tukang cat @ Rp. 45,000.00 180.00
0.0700 org Pekerja @ Rp. 35,000.00 2,450.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 7,211.25
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pemasangan wall paper


6.19 1.2000 m2 Wall paper @ Rp. 40,000.00
0.2000 kg Perekat @ Rp. 60,000.00
0.2000 org Tukang cat @ Rp. 42,500.00 8,500.00
0.0020 org Kepala tukang cat @ Rp. 45,000.00 90.00
0.0200 org Pekerja @ Rp. 35,000.00 700.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 9,408.75
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pengecacatan permukaan baja dengan meni besi


6.20 0.1000 kg Meni besi sinkromat @ Rp. 20,000.00
0.0100 bh Kuas @ Rp. 8,000.00
0.2000 org Tukang cat @ Rp. 42,500.00 8,500.00
0.0200 org Kepala tukang cat @ Rp. 45,000.00 900.00
0.0200 org Pekerja @ Rp. 35,000.00 700.00
0.0100 org Mandor @ Rp. 47,500.00 475.00
JUMLAH ( BELUM PPN ) 10,575.00
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 203


No. Macam Pekerjaan Upah
(1) (2) (3)
SNI 1.0000 m2 Pengecacatan permukaan baja dengan meni besi memakai perancah
6.21 0.1000 kg Meni besi sinkromat @ Rp. 20,000.00
0.0100 bh Kuas @ Rp. 8,000.00
0.0020 m3 Perancah kayu @ Rp. 500,000.00
0.2250 org Tukang cat @ Rp. 42,500.00 9,562.50
0.0225 org Kepala tukang cat @ Rp. 45,000.00 1,012.50
0.2250 org Pekerja @ Rp. 35,000.00 7,875.00
0.0075 org Mandor @ Rp. 47,500.00 356.25
JUMLAH ( BELUM PPN ) 18,806.25
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 204


No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m2 Pengetiran kayu ( 2 x )


0.3500 kg Tir @ Rp. 8,000.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0050 org Mandor @ Rp. 47,500.00 237.50
JUMLAH ( BELUM PPN ) 3,737.50
JASA 10 %
JUMLAH
DIBULATKAN

Empiris 1.0000 m2 Pekerjaan cat duco 3 x


0.4250 kg Cat duco @ Rp. 60,000.00
0.0570 ltr Thinner @ Rp. 13,000.00
0.1000 lbr Amplas @ Rp. 3,000.00 300.00
0.3000 org Tukang cat @ Rp. 42,500.00 12,750.00
0.0300 org Kep. Tk. Cat @ Rp. 45,000.00 1,350.00
0.2000 org Pekerja @ Rp. 35,000.00 7,000.00
0.0100 org Mandor @ Rp. 47,500.00 475.00
JUMLAH ( BELUM PPN ) 21,875.00
JASA 10 %
JUMLAH
DIBULATKAN

31 1.0000 m2 Mengecat genteng


0.3600 kg Cat genteng air ICI Weathershield @ Rp. 42,000.00
0.0630 org Tukang cat @ Rp. 42,500.00 2,677.50
0.0063 org Kep. Tk. Cat @ Rp. 45,000.00 283.50
0.0200 org Pekerja @ Rp. 35,000.00 700.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH 3,779.75
JASA 10 %
JUMLAH
DIBULATKAN

PEKERJAAN BONGKARAN

AK 1.0000 m3 Membongkar pasangan batu kali


4.0000 org Tukang batu @ Rp. 45,000.00 180,000.00
0.4000 org Pekerja @ Rp. 35,000.00 14,000.00
JUMLAH ( BELUM PPN ) 194,000.00
JASA 10 %
JUMLAH
DIBULATKAN

AK 1.0000 m3 Membongkar pasangan batu merah dan membersihkan


2.0000 org Tukang batu @ Rp. 45,000.00 90,000.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
JUMLAH ( BELUM PPN ) 93,500.00
JASA 10 %
JUMLAH

Analisa Gedung - 205


No. Macam Pekerjaan Upah
(1) (2) (3)
DIBULATKAN

AK 1.0000 m3 Membongkar beton bertulang dan membersihkan


0.2000 org Tukang batu @ Rp. 45,000.00 9,000.00
8.0000 org Pekerja @ Rp. 35,000.00 280,000.00
0.1000 org Mandor @ Rp. 47,500.00 4,750.00
JUMLAH ( BELUM PPN ) 293,750.00
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 206


No. Macam Pekerjaan Upah
(1) (2) (3)

AK 10.0000 m2 Pekerjaan bongkar lantai tegel untuk dipergunakan lagi


2.0000 org Pekerja @ Rp. 35,000.00 70,000.00
0.1000 org Mandor @ Rp. 47,500.00 4,750.00
JUMLAH ( BELUM PPN ) 74,750.00

TIAP 1M2 ( BELUM PPN ) 7,475.00


JASA 10 %
JUMLAH
DIBULATKAN

I.6 10.0000 m2 Mengupas plesteran lama


1.2500 org Pekerja @ Rp. 35,000.00 43,750.00
0.1250 org Mandor @ Rp. 47,500.00 5,937.50
JUMLAH ( BELUM PPN ) 49,687.50

TIAP 1M2 ( BELUM PPN ) 4,968.75


JASA 10 %
JUMLAH
DIBULATKAN

I.7 10.0000 m2 Membongkar genteng / sirap untuk dipergunakan lagi


2.0000 org Pekerja @ Rp. 35,000.00 70,000.00
0.1000 org Mandor @ Rp. 47,500.00 4,750.00
JUMLAH ( BELUM PPN ) 74,750.00

TIAP 1M2 ( BELUM PPN ) 7,475.00


JASA 10 %
JUMLAH
DIBULATKAN

I.8 10.0000 m2 Membongkar atap seng


0.5000 org Tukang besi @ Rp. 45,000.00 22,500.00
1.0000 org Pekerja @ Rp. 35,000.00 35,000.00
JUMLAH ( BELUM PPN ) 57,500.00

TIAP 1M2 ( BELUM PPN ) 5,750.00


JASA 10 %
JUMLAH
DIBULATKAN

I.9 10.0000 m2 Membongkar usuk / reng dipakai lagi


0.6000 org Tukang kayu @ Rp. 47,500.00 28,500.00
0.0600 org Kep. Tk. Kayu @ Rp. 50,000.00 3,000.00
2.0000 org Pekerja @ Rp. 35,000.00 70,000.00
0.1000 org Mandor @ Rp. 47,500.00 4,750.00
JUMLAH ( BELUM PPN ) 106,250.00

TIAP 1M2 ( BELUM PPN ) 10,625.00


JASA 10 %

Analisa Gedung - 207


No. Macam Pekerjaan Upah
(1) (2) (3)
JUMLAH
DIBULATKAN

10.0000 m2 Membongkar usuk / reng tidak dipakai lagi


2.0000 org Pekerja @ Rp. 35,000.00 70,000.00
0.1000 org Mandor @ Rp. 47,500.00 4,750.00
JUMLAH ( BELUM PPN ) 74,750.00

TIAP 1M2 ( BELUM PPN ) 7,475.00


JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 208


No. Macam Pekerjaan Upah
(1) (2) (3)

L.12 1.0000 m3 Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan untuk digunakan lagi
6.0000 org Tukang kayu @ Rp. 47,500.00 285,000.00
0.6000 org Kep. Tk. Kayu @ Rp. 50,000.00 30,000.00
4.0000 org Pekerja @ Rp. 35,000.00 140,000.00
0.2000 org Mandor @ Rp. 47,500.00 9,500.00
JUMLAH ( BELUM PPN ) 464,500.00
JASA 10 %
JUMLAH
DIBULATKAN

1.0000 m3 Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan tidak digunakan lagi
1.0000 org Pekerja @ Rp. 35,000.00 35,000.00
0.2000 org Mandor @ Rp. 47,500.00 9,500.00
JUMLAH ( BELUM PPN ) 44,500.00
JASA 10 %
JUMLAH
DIBULATKAN

L.14 1.0000 m3 Mengerjakan kembali bangunan kayu yang telah dibongkar


12.0000 org Tukang kayu @ Rp. 47,500.00 570,000.00
1.2000 org Kep. Tk. Kayu @ Rp. 50,000.00 60,000.00
4.0000 org Pekerja @ Rp. 35,000.00 140,000.00
0.2000 org Mandor @ Rp. 47,500.00 9,500.00
JUMLAH ( BELUM PPN ) 779,500.00
JASA 10 %
JUMLAH
DIBULATKAN

ANALISA SUPLEMEN
1 1.0000 m1 Pasang pipa beton oval dia. 25/37,5 dalam 0 - 1 m
1.0000 bh Pipa beton oval @ Rp. 35,000.00
0.7500 org Pekerja @ Rp. 35,000.00 26,250.00
0.1500 org Tukang batu @ Rp. 45,000.00 6,750.00
0.0150 Org Mandor @ Rp. 47,500.00 712.50
JUMLAH ( BELUM PPN ) 33,712.50
JASA 10 %
JUMLAH
DIBULATKAN

2 1.0000 m1 Pasang pipa beton oval dia. 25/37,5 dalam 1 - 2 m


1 bh Pipa beton oval @ Rp. 35,000.00
1.5 org Pekerja @ Rp. 35,000.00 52,500.00
0.15 org Tukang batu @ Rp. 45,000.00 6,750.00
0.015 Org Mandor @ Rp. 47,500.00 712.50
JUMLAH ( BELUM PPN ) 59,962.50
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 209


No. Macam Pekerjaan Upah
(1) (2) (3)
3 1.0000 M Pengelasan Single ( las listrik )
3.0000 kg Kawat las @ Rp. 6,500.00
1.0000 hari Peralatan las @ Rp. #REF!
0.5000 org Tukang las @ Rp. 45,000.00 22,500.00
0.0500 org Kepala tukang las @ Rp. 47,500.00 2,375.00
1.0000 Org Pekerja @ Rp. 45,000.00 45,000.00
1.0000 Org Mandor @ Rp. 47,500.00 47,500.00
JUMLAH ( BELUM PPN ) 117,375.00
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 210


No. Macam Pekerjaan Upah
(1) (2) (3)

PEKERJAAN SANITASI
SNI 1.0000 bh Memasang kloset duduk/monoblock
1.0000 bh Kloset duduk / monoblock @ Rp. 1,250,000.00
6.1 6% x Harga kloset (Perlengkapan) @ Rp. 1,250,000.00
1.1000 org Tukang batu @ Rp. 45,000.00 49,500.00
0.0010 org Kepala tukang batu @ Rp. 47,500.00 47.50
3.3000 org Pekerja @ Rp. 35,000.00 115,500.00
0.1600 org Mandor @ Rp. 47,500.00 7,600.00
JUMLAH ( BELUM PPN ) 172,647.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 bh Memasang kloset jongkok porselen


1.0000 bh Kloset jongkok porselen @ Rp. 75,000.00
6.2 6.0000 kg PC @ Rp. 1,196.00
0.0100 m3 Pasir pasang @ Rp. 145,000.00
1.5000 org Tukang batu @ Rp. 45,000.00 67,500.00
1.5000 org Kepala tukang batu @ Rp. 47,500.00 71,250.00
1.0000 org Pekerja @ Rp. 35,000.00 35,000.00
0.1600 org Mandor @ Rp. 47,500.00 7,600.00
JUMLAH ( BELUM PPN ) 181,350.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 bh Memasang kloset jongkok teraso


1.0000 bh Kloset jongkok teraso @ Rp. 25,000.00
6.3 7.0000 bh Bata merah 5 x 11 x 22 cm @ Rp. 500.00
6.0000 kg PC @ Rp. 1,196.00
0.0100 m3 Pasir pasang @ Rp. 145,000.00
1.5000 org Tukang batu @ Rp. 45,000.00 67,500.00
0.3000 org Kepala tukang batu @ Rp. 47,500.00 14,250.00
1.0000 org Pekerja @ Rp. 35,000.00 35,000.00
0.1100 org Mandor @ Rp. 47,500.00 5,225.00
JUMLAH ( BELUM PPN ) 121,975.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 bh Memasang urinoir


1.0000 bh Urinoir @ Rp. 785,000.00
6.4 30% x Harga urinoir (Perlengkapan) @ Rp. 785,000.00
6.0000 kg PC @ Rp. 1,196.00
0.0100 m3 Pasir pasang @ Rp. 145,000.00
1.0000 org Tukang batu @ Rp. 45,000.00 45,000.00
0.1000 org Kepala tukang batu @ Rp. 47,500.00 4,750.00
1.0000 org Pekerja @ Rp. 35,000.00 35,000.00
0.1000 org Mandor @ Rp. 47,500.00 4,750.00
JUMLAH ( BELUM PPN ) 89,500.00

Analisa Gedung - 211


No. Macam Pekerjaan Upah
(1) (2) (3)
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 bh Memasang wastafel


1.0000 bh Wastafel @ Rp. 271,340.00
6.5 12% x Harga wastafel (Perlengkapan) @ Rp. 271,340.00
6.0000 kg PC @ Rp. 1,196.00
0.0100 m3 Pasir pasang @ Rp. 145,000.00
1.4500 org Tukang batu @ Rp. 45,000.00 65,250.00
0.1500 org Kepala tukang batu @ Rp. 47,500.00 7,125.00
1.2000 org Pekerja @ Rp. 35,000.00 42,000.00
0.1000 org Mandor @ Rp. 47,500.00 4,750.00
JUMLAH ( BELUM PPN ) 119,125.00
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 212


No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 bh Memasang bak mandi fiberglass volume 0,30 m3


1.0000 bh Bak fiberglass @ Rp. 275,000.00
6.7 18% x Harga bak(Perlengkapan) @ Rp. 275,000.00
2.7000 org Tukang batu @ Rp. 45,000.00 121,500.00
0.5400 org Kepala tukang batu @ Rp. 47,500.00 25,650.00
1.8000 org Pekerja @ Rp. 35,000.00 63,000.00
0.1100 org Mandor @ Rp. 47,500.00 5,225.00
JUMLAH ( BELUM PPN ) 215,375.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 bh Memasang badkip porselen


1.0000 bh Badkip @ Rp. 150,000.00
6.9 20% x Harga badkip (Perlengkapan) @ Rp. 150,000.00
0.0750 org Tukang batu @ Rp. 45,000.00 3,375.00
0.7500 org Kepala tukang batu @ Rp. 47,500.00 35,625.00
org Pekerja @ Rp. 35,000.00 -
0.2500 org Mandor @ Rp. 47,500.00 11,875.00
JUMLAH ( BELUM PPN ) 50,875.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 bh Memasang bak fiberglass volume 1 m3 air


1.0000 bh Bak fiberglass @ Rp. 825,000.00
6.11 12% x Harga bak (Perlengkapan) @ Rp. 825,000.00
4.5000 org Tukang batu @ Rp. 45,000.00 202,500.00
0.9000 org Kepala tukang batu @ Rp. 47,500.00 42,750.00
3.0000 org Pekerja @ Rp. 35,000.00 105,000.00
0.9000 org Mandor @ Rp. 47,500.00 42,750.00
JUMLAH ( BELUM PPN ) 393,000.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m1 Memasang pipa penyalur air limbah jenis pipa tanah, diameter 15 cm
1.6000 bh Pipa tanah @ Rp. 25,000.00
6.12 0.6800 kg PC @ Rp. 1,196.00
0.0130 m3 Pasir pasang @ Rp. 145,000.00
0.0110 m 3
Pasir urug @ Rp. 75,000.00
0.0300 org Tukang batu @ Rp. 45,000.00 1,350.00
0.0030 org Kepala tukang batu @ Rp. 47,500.00 142.50
0.0600 org Pekerja @ Rp. 35,000.00 2,100.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 3,711.25
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 213


No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m1 Memasang pipa penyalur air limbah jenis pipa tanah, diameter 20 cm
1.6000 bh Pipa tanah @ Rp. 35,000.00
6.13 0.8700 kg PC @ Rp. 1,196.00
0.0140 m3 Pasir pasang @ Rp. 145,000.00
0.1400 m 3
Pasir urug @ Rp. 75,000.00
0.0400 org Tukang batu @ Rp. 45,000.00 1,800.00
0.0040 org Kepala tukang batu @ Rp. 47,500.00 190.00
0.0800 org Pekerja @ Rp. 35,000.00 2,800.00
0.0070 org Mandor @ Rp. 47,500.00 332.50
JUMLAH ( BELUM PPN ) 5,122.50
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 214


No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m1 Memasang pipa beton, diameter 15 cm - 20 cm


1.1000 bh Pipa beton @ Rp. 24,000.00
6.14 16.0000 bh Batu bata @ Rp. 500.00
3.9200 kg PC @ Rp. 1,196.00
0.0560 m3 Pasir pasang @ Rp. 145,000.00
0.0240 m3 Pasir urug @ Rp. 75,000.00
0.0700 org Tukang batu @ Rp. 45,000.00 3,150.00
0.0070 org Kepala tukang batu @ Rp. 47,500.00 332.50
0.1400 org Pekerja @ Rp. 35,000.00 4,900.00
0.0070 org Mandor @ Rp. 47,500.00 332.50
JUMLAH ( BELUM PPN ) 8,715.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m1 Memasang pipa beton, diameter 30 cm - 100 cm


1.1000 bh Pipa beton @ Rp. 25,000.00
6.15 330.0000 bh Batu bata @ Rp. 500.00
10.3000 kg PC @ Rp. 1,196.00
0.0610 m3 Pasir pasang @ Rp. 145,000.00
0.0690 m 3
Pasir urug @ Rp. 75,000.00
0.1900 org Tukang batu @ Rp. 45,000.00 8,550.00
0.0190 org Kepala tukang batu @ Rp. 47,500.00 902.50
0.3800 org Pekerja @ Rp. 35,000.00 13,300.00
0.0190 org Mandor @ Rp. 47,500.00 902.50
JUMLAH ( BELUM PPN ) 23,655.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 bh Memasang bak kontrol pasangan batu bata ukuran (30 x 30) cm, tinggi 35 cm
87.0000 bh Batu bata @ Rp. 500.00
6.16 44.0000 kg PC @ Rp. 1,196.00
0.0700 m3 Pasir pasang @ Rp. 145,000.00
0.0700 m3 Batu kerikil @ Rp. 90,000.00
1.6000 kg Besi beton @ Rp. 12,500.00
0.0600 m3 Pasir beton @ Rp. 120,000.00
1.0150 org Tukang batu @ Rp. 45,000.00 45,675.00
0.0015 org Kepala tukang batu @ Rp. 47,500.00 71.25
3.2000 org Pekerja @ Rp. 35,000.00 112,000.00
0.0160 org Mandor @ Rp. 47,500.00 760.00
JUMLAH ( BELUM PPN ) 158,506.25
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 bh Memasang bak kontrol pasangan batu bata ukuran (45 x 45) cm, tinggi 50 cm
150.0000 bh Batu bata @ Rp. 500.00

Analisa Gedung - 215


No. Macam Pekerjaan Upah
(1) (2) (3)
6.17 77.0000 kg PC @ Rp. 1,196.00
0.1300 m3 Pasir pasang @ Rp. 145,000.00
0.0200 m3 Batu kerikil @ Rp. 90,000.00
2.6000 kg Besi beton @ Rp. 12,500.00
0.0900 m3 Pasir beton @ Rp. 120,000.00
0.4730 org Tukang batu @ Rp. 45,000.00 21,285.00
0.0470 org Kepala tukang batu @ Rp. 47,500.00 2,232.50
1.4200 org Pekerja @ Rp. 35,000.00 49,700.00
0.0710 org Mandor @ Rp. 47,500.00 3,372.50
JUMLAH ( BELUM PPN ) 76,590.00
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 216


No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 bh Memasang bak kontrol pasangan batu bata ukuran (60 x 60) cm, tingg 65 cm
222.0000 bh Batu bata @ Rp. 500.00
6.18 114.0000 kg PC @ Rp. 1,196.00
0.1840 m3 Pasir pasang @ Rp. 145,000.00
0.0330 m Batu kerikil
3
@ Rp. 90,000.00
4.8500 kg Besi beton @ Rp. 12,500.00
0.1200 m3 Pasir beton @ Rp. 120,000.00
0.7200 org Tukang batu @ Rp. 45,000.00 32,400.00
0.0720 org Kepala tukang batu @ Rp. 47,500.00 3,420.00
2.1600 org Pekerja @ Rp. 35,000.00 75,600.00
0.1000 org Mandor @ Rp. 47,500.00 4,750.00
JUMLAH ( BELUM PPN ) 116,170.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m1 Memasang pipa galvanis diameter 1/2"


1.2000 m1 Pipa galvanis @ Rp. 18,000.00
6.19 35% x Harga pipa (Perlengkapan) @ Rp. 18,000.00
0.0900 org Tukang batu @ Rp. 45,000.00 4,050.00
0.0090 org Kepala tukang batu @ Rp. 47,500.00 427.50
0.0540 org Pekerja @ Rp. 35,000.00 1,890.00
0.0270 org Mandor @ Rp. 47,500.00 1,282.50
JUMLAH ( BELUM PPN ) 7,650.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m1 Memasang pipa galvanis diameter 3/4"


1.2000 m1 Pipa galvanis @ Rp. 24,000.00
6.20 35% x Harga pipa (Perlengkapan) @ Rp. 24,000.00
0.0900 org Tukang batu @ Rp. 45,000.00 4,050.00
0.0090 org Kepala tukang batu @ Rp. 47,500.00 427.50
0.0540 org Pekerja @ Rp. 35,000.00 1,890.00
0.0270 org Mandor @ Rp. 47,500.00 1,282.50
JUMLAH ( BELUM PPN ) 7,650.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m1 Memasang pipa galvanis diameter 1"


1.2000 m1 Pipa galvanis @ Rp. 36,500.00
6.21 35% x Harga pipa (Perlengkapan) @ Rp. 36,500.00
0.0900 org Tukang batu @ Rp. 45,000.00 4,050.00
0.0090 org Kepala tukang batu @ Rp. 47,500.00 427.50
0.0540 org Pekerja @ Rp. 35,000.00 1,890.00
0.0270 org Mandor @ Rp. 47,500.00 1,282.50
JUMLAH ( BELUM PPN ) 7,650.00

Analisa Gedung - 217


No. Macam Pekerjaan Upah
(1) (2) (3)
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m1 Memasang pipa galvanis diameter 1 1/2"


1.2000 m1 Pipa galvanis @ Rp. 70,000.00
6.22 35% x Harga pipa (Perlengkapan) @ Rp. 70,000.00
0.1800 org Tukang batu @ Rp. 45,000.00 8,100.00
0.0180 org Kepala tukang batu @ Rp. 47,500.00 855.00
0.1080 org Pekerja @ Rp. 35,000.00 3,780.00
0.0054 org Mandor @ Rp. 47,500.00 256.50
JUMLAH ( BELUM PPN ) 12,991.50
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 218


No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m1 Memasang pipa galvanis diameter 3"


1.2000 m1 Pipa galvanis @ Rp. 92,320.00
6.23 35% x Harga pipa (Perlengkapan) @ Rp. 92,320.00
0.1800 org Tukang batu @ Rp. 45,000.00 8,100.00
0.0180 org Kepala tukang batu @ Rp. 47,500.00 855.00
0.1080 org Pekerja @ Rp. 35,000.00 3,780.00
0.0054 org Mandor @ Rp. 47,500.00 256.50
JUMLAH ( BELUM PPN ) 12,991.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m1 Memasang pipa galvanis diameter 4"


1.2000 m1 Pipa galvanis @ Rp. 124,160.00
6.24 35% x Harga pipa (Perlengkapan) @ Rp. 124,160.00
0.2250 org Tukang batu @ Rp. 45,000.00 10,125.00
0.0225 org Kepala tukang batu @ Rp. 47,500.00 1,068.75
0.1350 org Pekerja @ Rp. 35,000.00 4,725.00
0.0068 org Mandor @ Rp. 47,500.00 323.00
JUMLAH ( BELUM PPN ) 16,241.75
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m1 Memasang pipa PVC tipe AW diameter 1/2"


1.2000 m1 Pipa PVC @ Rp. 3,162.50
6.25 35% x Harga pipa (Perlengkapan) @ Rp. 3,162.50
0.0600 org Tukang batu @ Rp. 45,000.00 2,700.00
0.0060 org Kepala tukang batu @ Rp. 47,500.00 285.00
0.0360 org Pekerja @ Rp. 35,000.00 1,260.00
0.0018 org Mandor @ Rp. 47,500.00 85.50
JUMLAH ( BELUM PPN ) 4,330.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m1 Memasang pipa PVC tipe AW diameter 3/4"


1.2000 m1 Pipa PVC @ Rp. 4,250.00
6.26 35% x Harga pipa (Perlengkapan) @ Rp. 4,250.00
0.0600 org Tukang batu @ Rp. 45,000.00 2,700.00
0.0060 org Kepala tukang batu @ Rp. 47,500.00 285.00
0.0360 org Pekerja @ Rp. 35,000.00 1,260.00
0.0018 org Mandor @ Rp. 47,500.00 85.50
JUMLAH ( BELUM PPN ) 4,330.50
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 219


No. Macam Pekerjaan Upah
(1) (2) (3)
SNI 1.0000 m1 Memasang pipa PVC tipe AW diameter 1"
1.2000 m1 Pipa PVC @ Rp. 5,125.00
6.27 35% x Harga pipa (Perlengkapan) @ Rp. 5,125.00
0.0600 org Tukang batu @ Rp. 45,000.00 2,700.00
0.0060 org Kepala tukang batu @ Rp. 47,500.00 285.00
0.0360 org Pekerja @ Rp. 35,000.00 1,260.00
0.0018 org Mandor @ Rp. 47,500.00 85.50
JUMLAH ( BELUM PPN ) 4,330.50
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 220


No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m1 Memasang pipa PVC tipe AW diameter 1 1/2"


1.2000 m1 Pipa PVC @ Rp. 11,250.00
6.28 35% x Harga pipa (Perlengkapan) @ Rp. 11,250.00
0.0600 org Tukang batu @ Rp. 45,000.00 2,700.00
0.0060 org Kepala tukang batu @ Rp. 47,500.00 285.00
0.0360 org Pekerja @ Rp. 35,000.00 1,260.00
0.0018 org Mandor @ Rp. 47,500.00 85.50
JUMLAH ( BELUM PPN ) 4,330.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m1 Memasang pipa PVC tipe AW diameter 2"


1.2000 m1 Pipa PVC @ Rp. 15,000.00
6.29 35% x Harga pipa (Perlengkapan) @ Rp. 15,000.00
0.0900 org Tukang batu @ Rp. 45,000.00 4,050.00
0.0090 org Kepala tukang batu @ Rp. 47,500.00 427.50
0.0544 org Pekerja @ Rp. 35,000.00 1,904.00
0.0027 org Mandor @ Rp. 47,500.00 128.25
JUMLAH ( BELUM PPN ) 6,509.75
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m1 Memasang pipa PVC tipe AW diameter 2 1/2"


1.2000 m1 Pipa PVC @ Rp. 20,500.00
6.30 35% x Harga pipa (Perlengkapan) @ Rp. 20,500.00
0.0600 org Tukang batu @ Rp. 45,000.00 2,700.00
0.0060 org Kepala tukang batu @ Rp. 47,500.00 285.00
0.0360 org Pekerja @ Rp. 35,000.00 1,260.00
0.0018 org Mandor @ Rp. 47,500.00 85.50
JUMLAH ( BELUM PPN ) 4,330.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m1 Memasang pipa PVC tipe AW diameter 3"


1.2000 m1 Pipa PVC @ Rp. 20,500.00
6.31 35% x Harga pipa (Perlengkapan) @ Rp. 20,500.00
0.1350 org Tukang batu @ Rp. 45,000.00 6,075.00
0.0135 org Kepala tukang batu @ Rp. 47,500.00 641.25
0.0810 org Pekerja @ Rp. 35,000.00 2,835.00
0.0410 org Mandor @ Rp. 47,500.00 1,947.50
JUMLAH ( BELUM PPN ) 11,498.75
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 221


No. Macam Pekerjaan Upah
(1) (2) (3)
SNI 1.0000 m1 Memasang pipa PVC tipe AW diameter 4"
1.2000 m1 Pipa PVC @ Rp. 33,750.00
6.32 35% x Harga pipa (Perlengkapan) @ Rp. 33,750.00
0.1350 org Tukang batu @ Rp. 45,000.00 6,075.00
0.0135 org Kepala tukang batu @ Rp. 47,500.00 641.25
0.0810 org Pekerja @ Rp. 35,000.00 2,835.00
0.0410 org Mandor @ Rp. 47,500.00 1,947.50
JUMLAH ( BELUM PPN ) 11,498.75
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 222


No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 bh Memasang bak cuci piring stainless steel


1.0000 bh Bak cuci stainless steel @ Rp. 500,000.00
6.33 1.0000 set Water drain + asesories @ Rp. 75,000.00
0.3000 org Tukang batu @ Rp. 45,000.00 13,500.00
0.0300 org Kepala tukang batu @ Rp. 47,500.00 1,425.00
0.0300 org Pekerja @ Rp. 35,000.00 1,050.00
0.0015 org Mandor @ Rp. 47,500.00 71.25
JUMLAH ( BELUM PPN ) 16,046.25
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 bh Memasang bak cuci piring teraso


1.0000 bh Bak cuci teraso @ Rp. 175,000.00
6.34 1.0000 set Water drain + asesories @ Rp. 75,000.00
20.0000 kg PC @ Rp. 1,196.00
0.0500 m3 Pasir pasang @ Rp. 145,000.00
0.5000 org Tukang batu @ Rp. 45,000.00 22,500.00
0.0500 org Kepala tukang batu @ Rp. 47,500.00 2,375.00
0.0500 org Pekerja @ Rp. 35,000.00 1,750.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 26,743.75
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 bh Memasang kran diameter 3/4" atau 1/2"


1.0000 bh Kran air @ Rp. 25,000.00
6.35 0.0250 bh Seal tape @ Rp. 2,500.00
0.1000 org Tukang batu @ Rp. 45,000.00 4,500.00
0.0100 org Kepala tukang batu @ Rp. 47,500.00 475.00
0.0100 org Pekerja @ Rp. 35,000.00 350.00
0.0050 org Mandor @ Rp. 47,500.00 237.50
JUMLAH ( BELUM PPN ) 5,562.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 bh Memasang floor drain


1.0000 bh Floor drain @ Rp. 55,000.00
6.35 0.1000 org Tukang batu @ Rp. 45,000.00 4,500.00
0.0100 org Kepala tukang batu @ Rp. 47,500.00 475.00
0.0100 org Pekerja @ Rp. 35,000.00 350.00
0.0050 org Mandor @ Rp. 47,500.00 237.50
JUMLAH ( BELUM PPN ) 5,562.50
JASA 10 %
JUMLAH
DIBULATKAN

PEKERJAAN BESI DAN ALUMUNIUM

Analisa Gedung - 223


No. Macam Pekerjaan Upah
(1) (2) (3)
SNI 1.0000 kg Pasang rangka atap baja
1.1000 kg Baja @ Rp. 8,800.00
6.1 0.0800 kg Meni besi @ Rp. 20,000.00
0.0060 org Tukang besi @ Rp. 45,000.00 270.00
0.0060 org Kepala tukang besi @ Rp. 47,500.00 285.00
0.0600 org Pekerja @ Rp. 35,000.00 2,100.00
0.0003 org Mandor @ Rp. 47,500.00 14.25
JUMLAH ( BELUM PPN ) 2,669.25
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 224


No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m2 Pasang pintu besi baja


1.0000 m2 Pintu besi baja @ Rp. 750,000.00
6.2 0.6500 org Tukang besi konstruksi @ Rp. 45,000.00 29,250.00
0.0650 org Kepala tukang besi @ Rp. 47,500.00 3,087.50
0.6500 org Pekerja @ Rp. 35,000.00 22,750.00
0.0320 org Mandor @ Rp. 47,500.00 1,520.00
JUMLAH ( BELUM PPN ) 56,607.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang jendela besi


1.0000 m2 Jendela besi @ Rp. 750,000.00
6.3 1.0500 org Tukang besi konstruksi @ Rp. 45,000.00 47,250.00
0.1050 org Kepala tukang besi @ Rp. 47,500.00 4,987.50
1.0500 org Pekerja @ Rp. 35,000.00 36,750.00
0.0053 org Mandor @ Rp. 47,500.00 249.38
JUMLAH ( BELUM PPN ) 89,236.88
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang jendela besi tahan api


1.0000 m2 Jendela besi tahan api @ Rp. 1,500,000.00
6.4 1.2000 org Tukang besi konstruksi @ Rp. 45,000.00 54,000.00
0.1200 org Kepala tukang besi @ Rp. 47,500.00 5,700.00
1.0220 org Pekerja @ Rp. 35,000.00 35,770.00
0.0060 org Mandor @ Rp. 47,500.00 285.00
JUMLAH ( BELUM PPN ) 95,755.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang pintu gulung besi


1.0000 m2 Pintu gulung besi @ Rp. 250,000.00
6.5 1.2000 org Tukang besi konstruksi @ Rp. 45,000.00 54,000.00
0.1200 org Kepala tukang besi @ Rp. 47,500.00 5,700.00
1.2000 org Pekerja @ Rp. 35,000.00 42,000.00
0.0060 org Mandor @ Rp. 47,500.00 285.00
JUMLAH ( BELUM PPN ) 101,985.00
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang pintu lipat


1.0000 m2 Pintu lipat @ Rp. 500,000.00
6.6 1.0500 org Tukang besi konstruksi @ Rp. 45,000.00 47,250.00
0.1050 org Kepala tukang besi @ Rp. 47,500.00 4,987.50

Analisa Gedung - 225


No. Macam Pekerjaan Upah
(1) (2) (3)
1.0500 org Pekerja @ Rp. 35,000.00 36,750.00
0.0052 org Mandor @ Rp. 47,500.00 247.00
JUMLAH ( BELUM PPN ) 89,234.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang pintu Sunscreen alumunium


1.0000 m2 Sunscreen alumunium @ Rp. 250,000.00
6.7 0.8000 org Tukang besi konstruksi @ Rp. 45,000.00 36,000.00
0.0800 org Kepala tukang besi @ Rp. 47,500.00 3,800.00
0.0800 org Pekerja @ Rp. 35,000.00 2,800.00
0.0040 org Mandor @ Rp. 47,500.00 190.00
JUMLAH ( BELUM PPN ) 42,790.00
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 226


No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m2 Pasang Rolling door


1.0000 m2 Roll door @ Rp. 200,000.00
6.8 1.5000 org Tukang besi konstruksi @ Rp. 45,000.00 67,500.00
0.1050 org Kepala tukang besi @ Rp. 47,500.00 4,987.50
1.0500 org Pekerja @ Rp. 35,000.00 36,750.00
0.0052 org Mandor @ Rp. 47,500.00 247.00
JUMLAH ( BELUM PPN ) 109,484.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang pintu alumunium


1.0000 m2 Pintu alumunium @ Rp. 400,000.00
6.9 1.0500 org Tukang besi konstruksi @ Rp. 45,000.00 47,250.00
0.1050 org Kepala tukang besi @ Rp. 47,500.00 4,987.50
1.0500 org Pekerja @ Rp. 35,000.00 36,750.00
0.0052 org Mandor @ Rp. 47,500.00 247.00
JUMLAH ( BELUM PPN ) 89,234.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang Vertikal blinds


1.0000 m2 Vertikal blinds @ Rp. 250,000.00
6.11 0.3500 org Tukang kayu @ Rp. 45,000.00 15,750.00
0.0350 org Kepala tukang kayu @ Rp. 47,500.00 1,662.50
0.3500 org Pekerja @ Rp. 35,000.00 12,250.00
0.0018 org Mandor @ Rp. 47,500.00 83.13
JUMLAH ( BELUM PPN ) 29,745.63
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang teralis besi


11.5000 m1 Baja strip 2 x 3 @ Rp. 12,500.00
6.12 1.2000 org Tukang las @ Rp. 45,000.00 54,000.00
0.0120 org Kepala tukang las @ Rp. 47,500.00 570.00
1.2000 org Pekerja @ Rp. 35,000.00 42,000.00
0.0006 org Mandor @ Rp. 47,500.00 28.50
JUMLAH ( BELUM PPN ) 96,598.50
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang kawat harmonika


1.1000 m2 Kawat harmonika @ Rp. 25,000.00
6.13 0.0200 kg Paku biasa 1/2" - 1" @ Rp. 11,000.00
0.0018 m3 Kayu kamper papan @ Rp. 8,000,000.00

Analisa Gedung - 227


No. Macam Pekerjaan Upah
(1) (2) (3)
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kepala tukang kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0005 org Mandor @ Rp. 47,500.00 23.75
JUMLAH ( BELUM PPN ) 8,773.75
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 228


No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m2 Pasang kawat nyamuk


1.1000 m2 Kawat nyamuk @ Rp. 8,250.00
6.14 0.0200 kg Paku biasa 1/2" - 1" @ Rp. 11,000.00
0.0018 m3 Kayu kamper papan @ Rp. 8,000,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kepala tukang kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0005 org Mandor @ Rp. 47,500.00 23.75
JUMLAH ( BELUM PPN ) 8,773.75
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang kawat kassa


1.1000 m2 Kawat kassa @ Rp. 10,000.00
6.15 0.0200 kg Paku biasa 1/2" - 1" @ Rp. 11,000.00
0.0018 m3 Kayu kamper papan @ Rp. 8,000,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kepala tukang kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0005 org Mandor @ Rp. 47,500.00 23.75
JUMLAH ( BELUM PPN ) 8,773.75
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang kawat burung


1.1000 m2 Kawat burung @ Rp. 15,000.00
6.16 0.0200 kg Paku biasa 1/2" - 1" @ Rp. 11,000.00
0.0018 m3 Kayu kamper papan @ Rp. 8,000,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kepala tukang kayu @ Rp. 50,000.00 500.00
0.1000 org Pekerja @ Rp. 35,000.00 3,500.00
0.0005 org Mandor @ Rp. 47,500.00 23.75
JUMLAH ( BELUM PPN ) 8,773.75
JASA 10 %
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang jendela nako & tralis


1.1000 m2 Jendela nako @ Rp. 20,000.00
6.17 0.0200 kg Paku skrup @ Rp. 10,000.00
0.0250 m2 Besi strip @ Rp. 11,500.00
0.2000 org Tukang kayu @ Rp. 47,500.00 9,500.00
0.0200 org Kepala tukang kayu @ Rp. 50,000.00 1,000.00
0.2000 org Pekerja @ Rp. 35,000.00 7,000.00
0.0010 org Mandor @ Rp. 47,500.00 47.50
JUMLAH ( BELUM PPN ) 17,547.50

Analisa Gedung - 229


No. Macam Pekerjaan Upah
(1) (2) (3)
JASA 10 %
JUMLAH
DIBULATKAN

PEKERJAAN KUNCI DAN KACA

6.1 1.0000 bh Pasang kunci tanam antik


1.0000 bh Kunci tanam antik @ Rp. 250,000.00
0.6000 org Tukang kayu @ Rp. 47,500.00 28,500.00
0.0600 org Kepala tukang kayu @ Rp. 50,000.00 3,000.00
0.0600 org Pekerja @ Rp. 35,000.00 2,100.00
0.0030 org Mandor @ Rp. 47,500.00 142.50
JUMLAH ( BELUM PPN ) 33,742.50
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 230


No. Macam Pekerjaan Upah
(1) (2) (3)

6.2 1.0000 bh Pasang kunci tanam biasa


1.0000 bh Kunci tanam biasa @ Rp. 125,000.00
0.5000 org Tukang kayu @ Rp. 47,500.00 23,750.00
0.0100 org Kepala tukang kayu @ Rp. 50,000.00 500.00
0.0100 org Pekerja @ Rp. 35,000.00 350.00
0.0050 org Mandor @ Rp. 47,500.00 237.50
JUMLAH ( BELUM PPN ) 24,837.50
JASA 10 %
JUMLAH
DIBULATKAN

6.3 1.0000 bh Pasang kunci tanam kamar mandi


1.0000 bh Kunci tanam kamar mandi @ Rp. 50,000.00
0.5000 org Tukang kayu @ Rp. 47,500.00 23,750.00
0.0050 org Kepala tukang kayu @ Rp. 50,000.00 250.00
0.0050 org Pekerja @ Rp. 35,000.00 175.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 24,293.75
JASA 10 %
JUMLAH
DIBULATKAN

6.4 1.0000 bh Pasang kunci tanam silinder


1.0000 bh Kunci silinder @ Rp. 75,000.00
0.5000 org Tukang kayu @ Rp. 47,500.00 23,750.00
0.0050 org Kepala tukang kayu @ Rp. 50,000.00 250.00
0.0050 org Pekerja @ Rp. 35,000.00 175.00
0.0003 org Mandor @ Rp. 47,500.00 11.88
JUMLAH ( BELUM PPN ) 24,186.88
JASA 10 %
JUMLAH
DIBULATKAN

6.5 1.0000 bh Pasang engsel pintu


1.0000 bh Engsel pintu @ Rp. 11,000.00
0.1500 org Tukang kayu @ Rp. 47,500.00 7,125.00
0.0150 org Kepala tukang kayu @ Rp. 50,000.00 750.00
0.0150 org Pekerja @ Rp. 35,000.00 525.00
0.0008 org Mandor @ Rp. 47,500.00 35.63
JUMLAH ( BELUM PPN ) 8,435.63
JASA 10 %
JUMLAH
DIBULATKAN

6.6 1.0000 bh Pasang engsel jendela kupu-kupu


1.0000 bh Engsel jendela @ Rp. 7,500.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kepala tukang kayu @ Rp. 50,000.00 500.00
0.0100 org Pekerja @ Rp. 35,000.00 350.00
0.0050 org Mandor @ Rp. 47,500.00 237.50

Analisa Gedung - 231


No. Macam Pekerjaan Upah
(1) (2) (3)
JUMLAH ( BELUM PPN ) 5,837.50
JASA 10 %
JUMLAH
DIBULATKAN

6.7 1.0000 bh Pasang engsel angin


1.0000 bh Engsel angin @ Rp. 3,000.00
0.2000 org Tukang kayu @ Rp. 47,500.00 9,500.00
0.0200 org Kepala tukang kayu @ Rp. 50,000.00 1,000.00
0.0200 org Pekerja @ Rp. 35,000.00 700.00
0.0100 org Mandor @ Rp. 47,500.00 475.00
JUMLAH ( BELUM PPN ) 11,675.00
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 232


No. Macam Pekerjaan Upah
(1) (2) (3)

6.8 1.0000 bh Pasang spring knip


1.0000 bh Spring knip @ Rp. 7,500.00
0.1500 org Tukang kayu @ Rp. 47,500.00 7,125.00
0.0150 org Kepala tukang kayu @ Rp. 50,000.00 750.00
0.0150 org Pekerja @ Rp. 35,000.00 525.00
0.0008 org Mandor @ Rp. 47,500.00 35.63
JUMLAH ( BELUM PPN ) 8,435.63
JASA 10 %
JUMLAH
DIBULATKAN

6.9 1.0000 bh Pasang kait angin


1.0000 bh Kait angin @ Rp. 3,000.00
0.1500 org Tukang kayu @ Rp. 47,500.00 7,125.00
0.0150 org Kepala tukang kayu @ Rp. 50,000.00 750.00
0.0150 org Pekerja @ Rp. 35,000.00 525.00
0.0008 org Mandor @ Rp. 47,500.00 35.63
JUMLAH ( BELUM PPN ) 8,435.63
JASA 10 %
JUMLAH
DIBULATKAN

6.10 1.0000 bh Pasang door closer


1.0000 bh Door closer @ Rp. 150,000.00
0.5000 org Tukang kayu @ Rp. 47,500.00 23,750.00
0.0500 org Kepala tukang kayu @ Rp. 50,000.00 2,500.00
0.0500 org Pekerja @ Rp. 35,000.00 1,750.00
0.0025 org Mandor @ Rp. 47,500.00 118.75
JUMLAH ( BELUM PPN ) 28,118.75
JASA 10 %
JUMLAH
DIBULATKAN

6.11 1.0000 bh Pasang kunci selot


1.0000 bh Kunci selot @ Rp. 50,000.00
0.2000 org Tukang kayu @ Rp. 47,500.00 9,500.00
0.0200 org Kepala tukang kayu @ Rp. 50,000.00 1,000.00
0.0200 org Pekerja @ Rp. 35,000.00 700.00
0.0010 org Mandor @ Rp. 47,500.00 47.50
JUMLAH ( BELUM PPN ) 11,247.50
JASA 10 %
JUMLAH
DIBULATKAN

6.12 1.0000 bh Pasang pegangan pintu / door holder


1.0000 bh Door holder @ Rp. 15,000.00
0.5000 org Tukang kayu @ Rp. 47,500.00 23,750.00
0.0500 org Kepala tukang kayu @ Rp. 50,000.00 2,500.00
0.0500 org Pekerja @ Rp. 35,000.00 1,750.00
0.0025 org Mandor @ Rp. 47,500.00 118.75

Analisa Gedung - 233


No. Macam Pekerjaan Upah
(1) (2) (3)
JUMLAH ( BELUM PPN ) 28,118.75
JASA 10 %
JUMLAH
DIBULATKAN

6.13 1.0000 bh Pasang door stop


1.0000 bh Door stop @ Rp. 15,000.00
0.1000 org Tukang kayu @ Rp. 47,500.00 4,750.00
0.0100 org Kepala tukang kayu @ Rp. 50,000.00 500.00
0.0100 org Pekerja @ Rp. 35,000.00 350.00
0.0005 org Mandor @ Rp. 47,500.00 23.75
JUMLAH ( BELUM PPN ) 5,623.75
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 234


No. Macam Pekerjaan Upah
(1) (2) (3)

6.14 1.0000 bh Pasang rel pintu dorong


1.0000 bh Rel pintu dorong @ Rp. 200,000.00
0.6000 org Tukang kayu @ Rp. 47,500.00 28,500.00
0.0600 org Kepala tukang kayu @ Rp. 50,000.00 3,000.00
0.0600 org Pekerja @ Rp. 35,000.00 2,100.00
0.0030 org Mandor @ Rp. 47,500.00 142.50
JUMLAH ( BELUM PPN ) 33,742.50
JASA 10 %
JUMLAH
DIBULATKAN

6.15 1.0000 bh Pasang kunci lemari


1.0000 bh Kunci lemari @ Rp. 12,000.00
0.2500 org Tukang kayu @ Rp. 47,500.00 11,875.00
0.0250 org Kepala tukang kayu @ Rp. 50,000.00 1,250.00
0.0250 org Pekerja @ Rp. 35,000.00 875.00
0.0013 org Mandor @ Rp. 47,500.00 59.38
JUMLAH ( BELUM PPN ) 14,059.38
JASA 10 %
JUMLAH
DIBULATKAN

6.16 1.0000 m2 Pasang kaca, tebal 3 mm


1.1000 m2 Kaca polos @ Rp. 50,000.00
0.1500 org Tukang kayu @ Rp. 47,500.00 7,125.00
0.0150 org Kepala tukang kayu @ Rp. 50,000.00 750.00
0.0150 org Pekerja @ Rp. 35,000.00 525.00
0.0008 org Mandor @ Rp. 47,500.00 35.63
JUMLAH ( BELUM PPN ) 8,435.63
JASA 10 %
JUMLAH
DIBULATKAN

6.17 1.0000 m2 Pasang kaca, tebal 5 mm


1.1000 m2 Kaca polos @ Rp. 65,000.00
0.1500 org Tukang kayu @ Rp. 47,500.00 7,125.00
0.0150 org Kepala tukang kayu @ Rp. 50,000.00 750.00
0.0150 org Pekerja @ Rp. 35,000.00 525.00
0.0008 org Mandor @ Rp. 47,500.00 35.63
JUMLAH ( BELUM PPN ) 8,435.63
JASA 10 %
JUMLAH
DIBULATKAN

6.20 1.0000 m2 Pasang kaca cermin, tebal 5 mm


1.1000 m2 Kaca cermin @ Rp. 120,000.00
0.1500 org Tukang kayu @ Rp. 47,500.00 7,125.00
0.0150 org Kepala tukang kayu @ Rp. 50,000.00 750.00
0.0150 org Pekerja @ Rp. 35,000.00 525.00

Analisa Gedung - 235


No. Macam Pekerjaan Upah
(1) (2) (3)
0.0008 org Mandor @ Rp. 47,500.00 35.63
JUMLAH ( BELUM PPN ) 8,435.63
JASA 10 %
JUMLAH
DIBULATKAN

6.24 1.0000 m2 Pasang kaca patri, tebal 5 mm


1.1000 m2 Kaca patri @ Rp. 300,000.00
0.1500 org Tukang kayu @ Rp. 47,500.00 7,125.00
0.0150 org Kepala tukang kayu @ Rp. 50,000.00 750.00
0.0150 org Pekerja @ Rp. 35,000.00 525.00
0.0008 org Mandor @ Rp. 47,500.00 35.63
JUMLAH ( BELUM PPN ) 8,435.63
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 236


No. Macam Pekerjaan Upah
(1) (2) (3)

6.17 1.0000 m1 Pasang kusen alumunium


1.1000 m1 Kusen alumunium @ Rp. 120,000.00
15% x Harga kusen (Perlengkapan) @ Rp. 120,000.00
0.1500 oh Tukang alumunium @ Rp. 45,000.00 6,750.00
0.0150 oh Kepala tukang @ Rp. 47,500.00 712.50
0.0150 oh Pekerja @ Rp. 35,000.00 525.00
0.0008 oh Mandor @ Rp. 47,500.00 35.63
JUMLAH 8,023.13
DIBULATKAN

Empiris 1.0000 m2 Mengerjakan Ukiran Gaya Yogyakarta dengan kedalaman 1 cm, tidak berlubang
Membuat pola ukir dan memindahkan pola
1.0000 lb Kertas 100 x 100 cm @ Rp. 2,000.00
15.0000 lbr Kerta karbon @ Rp. 3,500.00
2.0000 org Tukang gambar @ Rp. 35,000.00 70,000.00
JUMLAH ( A ) 70,000.00

Mengukir
16.0000 org Tukang Ukir @ Rp. 50,000.00 800,000.00
1.0000 org Kepala Tk, Ukir @ Rp. 50,000.00 50,000.00
JUMLAH ( B ) 850,000.00

Menggosok dan menghaluskan


20.0000 lbr Amplas @ Rp. 3,000.00
0.0800 kg Dempul @ Rp. 10,000.00
3.0000 org Tukang kayu @ Rp. 47,500.00 142,500.00
JUMLAH ( C ) 142,500.00

JUMLAH A + B + C ( BELUM PPN ) 1,062,500.00


JASA 10 %
JUMLAH
DIBULATKAN

Empiris 1.0000 m2 Mengerjakan Cat Sungging


Mengerjakan cat dasar
0.1200 kg Cat menie kayu @ Rp. 12,000.00
0.0400 org Tukang cat @ Rp. 42,500.00 1,700.00
0.0040 org Kep. Tk. Cat @ Rp. 45,000.00 180.00
0.0667 org Pekerja @ Rp. 35,000.00 2,334.50
0.0033 org Mandor @ Rp. 47,500.00 156.75
JUMLAH ( A ) 4,371.25

Mengecat dan membuat gradasi tutulan berkali-kali


0.4250 kg Cat kayu @ Rp. 39,000.00
0.1000 ltr Minyak cat @ Rp. 10,000.00
5.0000 org Tukang cat sungging @ Rp. 40,000.00 200,000.00
0.5000 org Kep. Tk. Cat sungging @ Rp. 45,000.00 22,500.00
0.2000 org Pekerja @ Rp. 35,000.00 7,000.00
0.0100 org Mandor @ Rp. 47,500.00 475.00

Analisa Gedung - 237


No. Macam Pekerjaan Upah
(1) (2) (3)
JUMLAH ( B ) 229,975.00
JUMLAH A + B ( BELUM PPN ) 234,346.25
JASA 10 %
JUMLAH
DIBULATKAN

Empiris 1.0000 m2 Memasang Prodo Mas 24 karat


1.2000 m2 Prodo @ Rp. 3,000,000.00
0.1200 kg Cat kayu @ Rp. 39,000.00
0.1000 org Tukang cat @ Rp. 42,500.00 4,250.00
8.0000 org Tukang Prodo @ Rp. 40,000.00 320,000.00
1.0000 org Kepala tukang @ Rp. 45,000.00 45,000.00
JUMLAH 369,250.00
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 238


No. Macam Pekerjaan Upah
(1) (2) (3)

Empiris 1.00 ttk Mengerjakan Sondir Tanah


0.50 hr Sewa alat @ Rp. 100,000.00
1.00 org Operator @ Rp. 75,000.00 75,000.00
0.50 org Analis @ Rp. 120,000.00 60,000.00
2.00 org Pekerja @ Rp. 35,000.00 70,000.00
0.10 org Mandor @ Rp. 47,500.00 4,750.00
JUMLAH ( BELUM PPN ) 209,750.00
JASA 10 %
JUMLAH
DIBULATKAN

Empiris 10.00 m3 Mengerjakan Test Laboratorium Sampel Beton


20.00 bh Benda uji silinder beton @ Rp. 3,000.00
20.00 bh Biaya tes @ Rp. 5,000.00
20.00 bh Biaya analisis @ Rp. 15,000.00
JUMLAH ( BELUM PPN ) -
JASA 10 %
JUMLAH
DIBULATKAN

Empiris 100.0000 m2 Pelumpuran ringan


4.0000 btg Bambu @ Rp. 7,000.00
35.0000 bh Bagor @ Rp. 600.00
2.0000 bh Irus @ Rp. 10,000.00
1.0000 bh Cetok @ Rp. 10,000.00
1.5000 bh Ember @ Rp. 5,000.00
0.1000 bh Linggis @ Rp. 35,000.00
1.0000 bh Martil @ Rp. 10,000.00
7.0000 org Pekerja @ Rp. 35,000.00 245,000.00
0.7500 org Mandor @ Rp. 47,500.00 35,625.00
JUMLAH ( BELUM PPN ) 280,625.00
JASA 10 %
JUMLAH
DIBULATKAN
BIAYA TIAP 1M2
(A) / 100.00
418,687.00 / 100.00

Empiris 100.0000 m2 Pelumpuran berat


8.0000 btg Bambu @ Rp. 7,000.00
60.0000 bh Bagor @ Rp. 600.00
0.1000 bh Pacul @ Rp. 30,000.00
1.0000 bh Cetok @ Rp. 10,000.00
0.1000 bh Linggis @ Rp. 35,000.00
2.0000 bh Irus @ Rp. 10,000.00
3.0000 bh Ember @ Rp. 5,000.00
1.0000 bh Betel @ Rp. 17,500.00
1.0000 bh Martil @ Rp. 10,000.00
12.0000 kg PC @ Rp. 1,196.00

Analisa Gedung - 239


No. Macam Pekerjaan Upah
(1) (2) (3)
0.1500 m3 Pasir pasang @ Rp. 145,000.00
2.0000 m1 Buis Beton 20/30 @ Rp. 30,000.00
18.0000 org Pekerja @ Rp. 35,000.00 630,000.00
1.7500 org Mandor @ Rp. 47,500.00 83,125.00
JUMLAH ( BELUM PPN ) 713,125.00
JASA 10 %
JUMLAH
DIBULATKAN
BIAYA TIAP 1M2
(A) / 100.00
1,078,249.00 / 100.00

Analisa Gedung - 240


No. Macam Pekerjaan Upah
(1) (2) (3)

Empiris 1.00 m3 Membuang lumpur SAL sejauh 15 km


0.50 org Pekerja @ Rp. 35,000.00 17,500.00
0.02 org Mandor @ Rp. 47,500.00 950.00
0.41 hr Sewa kendaraan @ Rp. 118,000.00 47,908.00
JUMLAH ( BELUM PPN ) 66,358.00
JASA 10 %
JUMLAH
DIBULATKAN

Empiris 1.00 m3 Mengangkut lumpur SAL sejauh 30 m


0.40 org Pekerja @ Rp. 35,000.00 14,000.00
0.02 org Mandor @ Rp. 47,500.00 712.50
0.50 hr Sewa gerobag @ Rp. 1,500.00 750.00
JUMLAH ( BELUM PPN ) 15,462.50
JASA 10 %
JUMLAH
DIBULATKAN

Empiris 10,000.00 m2 Penyapuan Jalan Dan Trotoar


447.00 bh Sapu lidi @ Rp. 3,000.00
14.00 bh Tangkai Sapu @ Rp. 5,000.00
14.00 bh Tomblok @ Rp. 3,500.00
4.00 bh Hareg @ Rp. 3,000.00
8.0000 bh Serok @ Rp. 5,000.00
8.00 bh Kerug @ Rp. 5,000.00
16.00 bh Seragam @ Rp. 75,000.00
14.00 bh Sarung tangan @ Rp. 7,500.00
14.00 bh Masker @ Rp. 7,500.00
4.00 bh Gerobak @ Rp. 1,500,000.00
2,555.00 org Pekerja @ Rp. 35,000.00 89,425,000.00
365.00 org Mandor @ Rp. 47,500.00 17,337,500.00
JUMLAH ( BELUM PPN ) 106,762,500.00
JASA 10 %
JUMLAH
DIBULATKAN ( Dalam 1 tahun )
BIAYA TIAP 1M2 / HARI :
(A) / (10000 x 365)
127,296,950.00 / 3,650,000.00

Empiris 1,000.00 m2 Pembersihan / Penyapuan halaman


0.1506 bh Sapu lidi @ Rp. 3,000.00
0.0109 bh Serok @ Rp. 5,000.00
0.0082 bh Seragam @ Rp. 75,000.00
0.0009 bh Gerobak @ Rp. 1,500,000.00
1.0000 org Pekerja @ Rp. 35,000.00 35,000.00
0.1428 org Mandor @ Rp. 47,500.00 6,783.00
JUMLAH ( BELUM PPN ) 41,783.00
JASA 10 %
JUMLAH

Analisa Gedung - 241


No. Macam Pekerjaan Upah
(1) (2) (3)
DIBULATKAN
BIAYA TIAP 1M2 / HARI :
(A) / ( 1000 )
48,679.00 / 1,000.00

Empiris 1,000.00 m2 Pemangkasan teh-tehan


0.0280 bh Gunting pangkas @ Rp. 35,000.00
0.0030 bh Gerobak @ Rp. 1,500,000.00
5.0000 org Pekerja @ Rp. 35,000.00 175,000.00
0.5000 org Mandor @ Rp. 47,500.00 23,750.00
JUMLAH ( BELUM PPN ) 198,750.00
JASA 10 %
JUMLAH
DIBULATKAN
DIKERJAKAN 2 KALI ( Dalam 1 bulan )
BIAYA TIAP 1M2 / HARI :
(A) / (1000 x 30)
449,306.00 / 30,000.00

Analisa Gedung - 242


No. Macam Pekerjaan Upah
(1) (2) (3)

Empiris 1,000.00 m2 Pangkas bentuk tanaman perdu


0.0890 bh Gunting pangkas @ Rp. 35,000.00
0.0060 bh Gerobak @ Rp. 1,500,000.00
8.0000 org Pekerja @ Rp. 35,000.00 280,000.00
1.0000 org Mandor @ Rp. 47,500.00 47,500.00
JUMLAH ( BELUM PPN ) 327,500.00
JASA 10 %
JUMLAH
DIBULATKAN
DIKERJAKAN 2 KALI ( Dalam 1 bulan )
BIAYA TIAP 1M2 / HARI :
(A) / (1000 x 30)
747,152.00 / 30,000.00

Empiris 1,000.00 m2 Pangkas rumput


0.0010 bh Mesin potong rumput @ Rp. 3,000,000.00
1.0000 bh Sapu lidi @ Rp. 3,000.00
0.0230 bh Tomblok @ Rp. 3,500.00
0.0030 bh Gerobak @ Rp. 1,500,000.00
6.0000 ltr BBM @ Rp. 4,500.00
1.0000 org Tenaga ahli @ Rp. 40,000.00 40,000.00
1.0000 org Pekerja @ Rp. 35,000.00 35,000.00
0.5000 org Mandor @ Rp. 47,500.00 23,750.00
JUMLAH ( BELUM PPN ) 98,750.00
JASA 10 %
JUMLAH
DIBULATKAN
DIKERJAKAN 2 KALI ( Dalam 1 bulan )
BIAYA TIAP 1M2 / HARI :
(A) / (1000 x 30)
299,926.00 / 30,000.00

Empiris 1,000.00 m2 Penyiangan tanaman semak dan penggemburan tanah


0.0230 bh Gathul @ Rp. 10,000.00
0.0230 bh Garpu tanah @ Rp. 15,000.00
0.0230 bh Arit @ Rp. 20,000.00
0.0050 bh Gerobak celeng @ Rp. 400,000.00
0.0230 bh Tomblok @ Rp. 3,500.00
4.0000 org Pekerja @ Rp. 35,000.00 140,000.00
1.0000 org Mandor @ Rp. 47,500.00 47,500.00
JUMLAH ( BELUM PPN ) 187,500.00
JASA 10 %
JUMLAH
DIBULATKAN
DIKERJAKAN 2 KALI ( Dalam 1 bulan )
BIAYA TIAP 1M2 / HARI :
(A) / (1000 x 30)
419,354.00 / 30,000.00

Analisa Gedung - 243


No. Macam Pekerjaan Upah
(1) (2) (3)
1.0000 m1 Pekerjaan Grouting / Injeksi retakan beton dengan epoxy resin
5.000 bh Nipel @ Rp. 10,000.00
0.050 kg Nitobond EC @ Rp. 100,000.00
0.016 kg Conbextra EP @ Rp. 200,000.00
0.225 hr Sewa Compressor @ Rp. 250,000.00
0.150 hr Sewa Mesin Grouting @ Rp. 150,000.00
0.075 hr Sewa mesin gerinda @ Rp. 100,000.00
1.000 hr Sewa mixer @ Rp. 6,000.00
1.000 ls Alat bantu @ Rp. 5,000.00
0.3125 org Tukang grouting @ Rp. 35,000.00 10,937.50
0.0312 org Kepala Tukang grouting @ Rp. 40,000.00 1,248.00
1.2500 org Pekerja @ Rp. 35,000.00 43,750.00
0.1562 org Mandor @ Rp. 47,500.00 7,419.50
JUMLAH ( BELUM PPN ) 63,355.00
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 244


No. Macam Pekerjaan Upah
(1) (2) (3)

1.0000 m1 Pekerjaan Grouting / Injeksi retakan dinding bata dengan Semen Slurry (Cebex 100)
3.000 bh Pipa @ Rp. 1,500.00
0.050 kg Nitobond EC @ Rp. 100,000.00
0.016 kg Cebex 100 @ Rp. 150,000.00
0.150 hr Sewa Mesin Grouting @ Rp. 150,000.00
0.075 hr Sewa mesin gerinda @ Rp. 100,000.00
1.000 ls Alat bantu @ Rp. 5,000.00
0.3125 org Tukang grouting @ Rp. 35,000.00 10,937.50
0.0312 org Kepala Tukang grouting @ Rp. 40,000.00 1,248.00
1.2500 org Pekerja @ Rp. 35,000.00 43,750.00
0.1562 org Mandor @ Rp. 47,500.00 7,419.50
JUMLAH ( BELUM PPN ) 63,355.00
JASA 10 %
JUMLAH
DIBULATKAN

1.0000 m1 Cor beton kerb ( 15 x 30 ) cm, dengan 1pc:2ps:3kr


15.3000 kg PC @ Rp. 1,196.00
0.0243 m3 Pasir pasang @ Rp. 145,000.00
0.0369 m3 Kerikil beton @ Rp. 78,650.00
0.0027 m3 Papan cetakan @ Rp. 1,000,000.00
0.0272 kg Paku @ Rp. 9,000.00
0.0340 org Tukang kayu @ Rp. 47,500.00 1,615.00
0.0158 org Tukang batu @ Rp. 45,000.00 711.00
0.0050 org Kepala tukang @ Rp. 47,500.00 237.50
0.1374 org Pekerja @ Rp. 35,000.00 4,809.00
0.0063 org Mandor @ Rp. 47,500.00 299.25
JUMLAH ( BELUM PPN ) 7,671.75
JASA 10 %
JUMLAH
DIBULATKAN

1.0000 m1 Cor beton Devider ( 30 x 30 ) cm, dengan 1pc:2ps:3kr


30.6000 kg PC @ Rp. 1,196.00
0.0486 m3 Pasir pasang @ Rp. 145,000.00
0.0738 m3 Kerikil beton @ Rp. 78,650.00
0.0027 m3 Papan cetakan @ Rp. 1,000,000.00
0.0272 kg Paku @ Rp. 9,000.00
0.0340 org Tukang kayu @ Rp. 47,500.00 1,615.00
0.0315 org Tukang batu @ Rp. 45,000.00 1,417.50
0.0066 org Kepala tukang @ Rp. 47,500.00 313.50
0.2499 org Pekerja @ Rp. 35,000.00 8,746.50
0.0116 org Mandor @ Rp. 47,500.00 551.00
JUMLAH ( BELUM PPN ) 12,643.50
JASA 10 %
JUMLAH
DIBULATKAN

Analisa Gedung - 245


Bahan Jumlah
(4) (5)

-
-
-
-
-
- 774,400.00
77,440.00
851,840.00
851,840.00

- 8,518.40

33,000.00
180.00
19,250.00

52,430.00 61,417.50
6,141.75
67,559.25
67,559.00

- 5,875.00
587.50
6,462.50
6,462.00

96,250.00
35,000.00
6,600.00
58,500.00
20,092.80
3,240.00
3,185.33

Analisa Gedung - 246


Bahan Jumlah
(4) (5)

222,868.13 434,893.13
43,489.31
478,382.44
478,382.00

29,493.75
2,359.50
7,250.00

39,103.25 78,853.25
7,885.33
86,738.58
86,738.00

Analisa Gedung - 247


Bahan Jumlah
(4) (5)

12,500.00
495,000.00
6,800.00
12,650.00
41,860.00
21,750.00
12,000.00
11,797.50
15,000.00
9,625.00
40,000.00
5,200.00
5,250.00
2,475.00

691,907.50 919,282.50
91,928.25
1,011,210.75
1,011,210.00

12,500.00
2,990.00
30,000.00
600.00
707.85
68,750.00
480.00
5,200.00

121,227.85 146,677.85
14,667.79
161,345.64
161,345.00

10,000.00
2,392.00
237,500.00
600.00

Analisa Gedung - 248


Bahan Jumlah
(4) (5)
707.85
480.00

251,679.85 273,629.85
27,362.99
300,992.84
300,992.00

Analisa Gedung - 249


Bahan Jumlah
(4) (5)

17,000.00
577,500.00
2,400.00
12,558.00
3,600.00
3,932.50
57,750.00

674,740.50 817,115.50
81,711.55
898,827.05
898,827.00

30,000.00
759,000.00
5,600.00
57,750.00

852,350.00 968,475.00
96,847.50
1,065,322.50
1,065,322.00

12,500.00
511,500.00
2,400.00
21,528.00
3,600.00
3,932.50
57,750.00
179,437.50

792,648.00 935,023.00
93,502.30
1,028,525.30
1,028,525.00

Analisa Gedung - 250


Bahan Jumlah
(4) (5)

99,000.00
640.00
15,225.00

114,865.00 129,186.25
12,918.63
142,104.88
142,104.00

Analisa Gedung - 251


Bahan Jumlah
(4) (5)

9,500.00
2,500.00

12,000.00 22,275.00
2,227.50
24,502.50
24,502.00

15,190.00

15,190.00 18,835.00
1,883.50
20,718.50
20,718.00

172,550.00
131,250.00
8,880.00
21,170.00
53,820.00

387,670.00 407,892.50
40,789.25
448,681.75
448,681.00

- 15,900.00
1,590.00
17,490.00
17,490.00

Analisa Gedung - 252


Bahan Jumlah
(4) (5)

- 20,908.50
2,090.85
22,999.35
22,999.00

- 29,216.25
2,921.63
32,137.88
32,137.00

Analisa Gedung - 253


Bahan Jumlah
(4) (5)

- 24,820.00
2,482.00
27,302.00
27,302.00

- 49,687.50
4,968.75
54,656.25
54,656.00

- 32,747.50
3,274.75
36,022.25
36,022.00

80,000.00

80,000.00 144,216.25
14,421.63
158,637.88
158,637.00

12,025.00
1,202.50
13,227.50
13,227.00

- 20,435.00
2,043.50
22,478.50
22,478.00

Analisa Gedung - 254


Bahan Jumlah
(4) (5)

9,225.00
922.50
10,147.50
10,147.00

7,622.50
762.25
8,384.75
8,384.00

Analisa Gedung - 255


Bahan Jumlah
(4) (5)

9,225.00
922.50
10,147.50
10,147.00

90,000.00

90,000.00 100,975.00
10,097.50
111,072.50
111,072.00

54,000.00

54,000.00 64,975.00
6,497.50
71,472.50
71,472.00

108,000.00

108,000.00 117,937.50
11,793.75
129,731.25
129,731.00

90,000.00

90,000.00 95,962.50
9,596.25
105,558.75
105,558.00

1,400.00
5,000.00

Analisa Gedung - 256


Bahan Jumlah
(4) (5)

6,400.00 25,087.50
2,508.75
27,596.25
27,596.00

Analisa Gedung - 257


Bahan Jumlah
(4) (5)

128,700.00
22,500.00

151,200.00 199,755.00
19,975.50
219,730.50
219,730.00

117,975.00
16,602.50
18,320.00
78,880.00

231,777.50 317,690.00
31,769.00
349,459.00
349,459.00

117,975.00
12,325.00
13,600.00
49,300.00

193,200.00 279,112.50
27,911.25
307,023.75
307,023.00

128,700.00
114,122.32
16,602.50
55,390.00

Analisa Gedung - 258


Bahan Jumlah
(4) (5)

314,814.82 400,727.32
40,072.73
440,800.05
440,800.00

Analisa Gedung - 259


Bahan Jumlah
(4) (5)

117,975.00
72,956.00
10,657.50
71,340.00

272,928.50 358,841.00
35,884.10
394,725.10
394,725.00

117,975.00
194,948.00
75,400.00

388,323.00 474,235.50
47,423.55
521,659.05
521,659.00

117,975.00
241,592.00
70,325.00

429,892.00 515,804.50
51,580.45
567,384.95
567,384.00

117,975.00
468,832.00
45,530.00

Analisa Gedung - 260


Bahan Jumlah
(4) (5)
632,337.00 718,249.50
71,824.95
790,074.45
790,074.00

117,975.00
319,332.00
61,915.00

499,222.00 585,134.50
58,513.45
643,647.95
643,647.00

Analisa Gedung - 261


Bahan Jumlah
(4) (5)

117,975.00
162,656.00
78,880.00

359,511.00 445,423.50
44,542.35
489,965.85
489,965.00

35,000.00
1,305.00
1,440.00
2,610.00

40,355.00 57,242.50
5,724.25
62,966.75
62,966.00

35,000.00
5,382.00
1,087.50
7,250.00

48,719.50 65,607.00
6,560.70
72,167.70
72,167.00

35,000.00
13,754.00
6,235.00

Analisa Gedung - 262


Bahan Jumlah
(4) (5)

54,989.00 71,876.50
7,187.65
79,064.15
79,064.00

35,000.00
17,186.52
5,800.00

57,986.52 74,874.02
7,487.40
82,361.42
82,361.00

Analisa Gedung - 263


Bahan Jumlah
(4) (5)

35,000.00
22,664.20
5,510.00

63,174.20 80,061.70
8,006.17
88,067.87
88,067.00

70,000.00
12,055.68
1,993.75
13,412.50

97,461.93 131,586.93
13,158.69
144,745.62
144,745.00

70,000.00
31,634.20
14,210.00

115,844.20 149,969.20
14,996.92
164,966.12
164,966.00

70,000.00
39,408.20
13,195.00

Analisa Gedung - 264


Bahan Jumlah
(4) (5)
122,603.20 156,728.20
15,672.82
172,401.02
172,401.00

70,000.00
52,026.00
11,600.00

133,626.00 167,751.00
16,775.10
184,526.10
184,526.00

Analisa Gedung - 265


Bahan Jumlah
(4) (5)

18,750.00
14,950.00
5,800.00

39,500.00 63,162.50
6,316.25
69,478.75
69,478.00

32,000.00
14,950.00
5,800.00

52,750.00 76,412.50
7,641.25
84,053.75
84,053.00

401,856.00
64,800.00
63,706.50

530,362.50 622,525.00
62,252.50
684,777.50
684,777.00

260,728.00
62,400.00
68,425.50

Analisa Gedung - 266


Bahan Jumlah
(4) (5)
391,553.50 465,541.00
46,554.10
512,095.10
512,095.00

75,075.00
73,255.00
58,000.00
51,122.50

257,452.50 531,452.50
53,145.25
584,597.75
584,597.00

Analisa Gedung - 267


Bahan Jumlah
(4) (5)

478,400.00
57,600.00
62,920.00

598,920.00 733,832.50
73,383.25
807,215.75
807,215.00

464,048.00
78,000.00
51,122.50

593,170.50 867,170.50
86,717.05
953,887.55
953,887.00

478,400.00
48,000.00
64,493.00

590,893.00 864,893.00
86,489.30
951,382.30
951,382.00

514,280.00
61,920.00
54,268.50

630,468.50 904,468.50

Analisa Gedung - 268


Bahan Jumlah
(4) (5)
90,446.85
994,915.35
994,915.00

13,125.00
181.50

13,306.50 13,914.00
1,391.40
15,305.40
15,305.00

Analisa Gedung - 269


Bahan Jumlah
(4) (5)

11,550.00
181.50

11,731.50 12,339.00
1,233.90
13,572.90
13,572.00

46,750.00
24,000.00
3,600.00

74,350.00 108,075.00
10,807.50
118,882.50
118,882.00

46,750.00
31,230.00
3,600.00

81,580.00 115,305.00
11,530.50
126,835.50
126,835.00

- 52,500.00
5,250.00
57,750.00
57,750.00

350,000.00

Analisa Gedung - 270


Bahan Jumlah
(4) (5)

350,000.00 1,032,062.50
103,206.25
1,135,268.75
1,135,268.00

640,000.00

640,000.00 906,450.00
90,645.00
997,095.00
997,095.00

Analisa Gedung - 271


Bahan Jumlah
(4) (5)

684,777.50
1,530,540.00
1,188,825.00
57,750.00
3,461,892.50 3,461,892.50
3,461,892.00

622,525.00
1,913,175.00
1,188,825.00
57,750.00
3,782,275.00 3,782,275.00
3,782,275.00

864,893.00
1,850,850.00
1,080,750.00
52,500.00
3,848,993.00 3,848,993.00
3,848,993.00

684,777.50
2,678,445.00
1,188,825.00
57,750.00
4,609,797.50 4,609,797.50
4,609,797.00

684,777.50
3,061,080.00
1,188,825.00
57,750.00
4,992,432.50 4,992,432.50
4,992,432.00

Analisa Gedung - 272


Bahan Jumlah
(4) (5)

684,777.50
1,530,540.00
1,188,825.00

Analisa Gedung - 273


Bahan Jumlah
(4) (5)
1,135,268.75
57,750.00
4,597,161.25 4,597,161.25
4,597,161.00

684,777.50
1,913,175.00
1,188,825.00
1,135,268.75
57,750.00
4,979,796.25 4,979,796.25
4,979,796.00

684,777.50
2,295,810.00
1,188,825.00
1,135,268.75
57,750.00
5,362,431.25 5,362,431.25
5,362,431.00

951,382.00
2,295,810.00
1,188,825.00
1,135,268.75
57,750.00
5,629,035.75 5,629,035.75
5,629,035.00

684,777.50
2,678,445.00
1,188,825.00
1,135,268.75
57,750.00
5,745,066.25 5,745,066.25
5,745,066.00

Analisa Gedung - 274


Bahan Jumlah
(4) (5)

684,777.50
3,061,080.00
1,188,825.00
1,135,268.75
57,750.00
6,127,701.25 6,127,701.25
6,127,701.00

684,777.50
1,530,540.00
1,188,825.00
997,095.00
57,750.00
4,458,987.50 4,458,987.50
4,458,987.00

684,777.50
1,913,175.00
1,188,825.00
997,095.00
57,750.00
4,841,622.50 4,841,622.50
4,841,622.00

Analisa Gedung - 275


Bahan Jumlah
(4) (5)

684,777.50
2,295,810.00
1,188,825.00
997,095.00
57,750.00
5,224,257.50 5,224,257.50
5,224,257.00

684,777.50
2,678,445.00
1,188,825.00
997,095.00
57,750.00
5,606,892.50 5,606,892.50
5,606,892.00

684,777.50
3,061,080.00
1,188,825.00
997,095.00
57,750.00
5,989,527.50 5,989,527.50
5,989,527.00

1,425.00
11,280.00
21,750.00
72,358.00
562,500.00
10,890.00
139,200.00
1,080.00
450.00
4,200.00

825,133.00 895,840.50

Analisa Gedung - 276


Bahan Jumlah
(4) (5)
89,584.05
985,424.55
985,424.00

Analisa Gedung - 277


Bahan Jumlah
(4) (5)

1,200.00
9,600.00
18,125.00
58,604.00
431,250.00
8,470.00
117,450.00
1,080.00
450.00
3,500.00

649,729.00 704,504.00
70,450.40
774,954.40
774,954.00

6,099.60
101.50
1,972.00

8,173.10 33,073.10
3,307.31
36,380.41
36,380.00

9,759.36
2,813.00

12,572.36 37,472.36
3,747.24
41,219.60
41,219.00

Analisa Gedung - 278


Bahan Jumlah
(4) (5)
7,787.16
3,030.50

10,817.66 35,717.66
3,571.77
39,289.42
39,289.00

Analisa Gedung - 279


Bahan Jumlah
(4) (5)

507.50
560.00
2,175.00

3,242.50 18,180.00
1,818.00
19,998.00
19,998.00

2,200.64
435.00
2,030.00

4,665.64 19,603.14
1,960.31
21,563.45
21,563.00

10,189.92
2,465.00

12,654.92 27,592.42
2,759.24
30,351.66
30,351.00

7,750.08
2,755.00

10,505.08 25,442.58
2,544.26
27,986.84

Analisa Gedung - 280


Bahan Jumlah
(4) (5)
27,986.00

6,219.20
2,900.00

9,119.20 24,056.70
2,405.67
26,462.37
26,462.00

Analisa Gedung - 281


Bahan Jumlah
(4) (5)

8,455.72
3,045.00

11,500.72 31,168.22
3,116.82
34,285.04
34,285.00

598.00
290.00

888.00 6,493.00
649.30
7,142.30
7,142.00

430.56
124.70

555.26 5,411.51
541.15
5,952.66
5,952.00

5,166.72
2,320.00

7,486.72 16,599.22
1,659.92
18,259.14
18,259.00

Analisa Gedung - 282


Bahan Jumlah
(4) (5)

5,166.72
1,200.00

6,366.72 20,804.22
2,080.42
22,884.64
22,884.00

Analisa Gedung - 283


Bahan Jumlah
(4) (5)

4,186.00

4,186.00 8,444.00
844.40
9,288.40
9,288.00

13,299.52
4,350.00

17,649.52 40,059.52
4,005.95
44,065.47
44,065.00

78,750.00
14,053.00
5,075.00

97,878.00 139,465.50
13,946.55
153,412.05
153,412.00

37,600.00
1,160.00
4,640.00
7,000.00

50,400.00 81,525.00
8,152.50

Analisa Gedung - 284


Bahan Jumlah
(4) (5)
89,677.50
89,677.00

28,000.00
1,160.00
4,640.00
1,196.00

34,996.00 66,121.00
6,612.10
72,733.10
72,733.00

Analisa Gedung - 285


Bahan Jumlah
(4) (5)

32,000.00
1,160.00
4,640.00
55.00

37,855.00 68,980.00
6,898.00
75,878.00
75,878.00

20,000.00
1,160.00
4,640.00
1,196.00

26,996.00 58,121.00
5,812.10
63,933.10
63,933.00

26,000.00
1,160.00
4,640.00
7,000.00

38,800.00 69,925.00
6,992.50
76,917.50
76,917.00

1,855.00
1,865.76
435.00

Analisa Gedung - 286


Bahan Jumlah
(4) (5)

4,155.76 7,890.76
789.08
8,679.84
8,679.00

Analisa Gedung - 287


Bahan Jumlah
(4) (5)

2,647.50
1,865.76
435.00

4,948.26 8,683.26
868.33
9,551.59
9,551.00

2,120.00
1,435.20
435.00
1,330.00

5,320.20 9,055.20
905.52
9,960.72
9,960.00

2,747.25
1,973.40
464.00
700.00

5,884.65 9,619.65
961.97
10,581.62
10,581.00

40,500.00
5,597.28
1,305.00
2,200.00

Analisa Gedung - 288


Bahan Jumlah
(4) (5)

49,602.28 83,821.03
8,382.10
92,203.13
92,203.00

Analisa Gedung - 289


Bahan Jumlah
(4) (5)

42,500.00
4,879.68
1,305.00
1,320.00

50,004.68 84,223.43
8,422.34
92,645.77
92,645.00

40,250.00
4,879.68
1,305.00
1,320.00

47,754.68 81,973.43
8,197.34
90,170.77
90,170.00

40,250.00
4,879.68
1,305.00
1,320.00

47,754.68 81,973.43
8,197.34
90,170.77
90,170.00

40,250.00
4,879.68
1,305.00
1,320.00

Analisa Gedung - 290


Bahan Jumlah
(4) (5)
47,754.68 81,973.43
8,197.34
90,170.77
90,170.00

10,350.00
1,435.20
435.00
700.00

12,920.20 16,655.20
1,665.52
18,320.72
18,320.00

Analisa Gedung - 291


Bahan Jumlah
(4) (5)

7,245.00
1,973.40
464.00
700.00

10,382.40 14,117.40
1,411.74
15,529.14
15,529.00

33,660.00
487.97
130.50
132.00

34,410.47 41,254.22
4,125.42
45,379.64
45,379.00

37,500.00
487.97
130.50
132.00

38,250.47 45,094.22
4,509.42
49,603.64
49,603.00

42,500.00
11,122.80
2,610.00
3,300.00

Analisa Gedung - 292


Bahan Jumlah
(4) (5)

59,532.80 103,830.30
10,383.03
114,213.33
114,213.00

Analisa Gedung - 293


Bahan Jumlah
(4) (5)

55,500.00
3,750.00

59,250.00 90,375.00
9,037.50
99,412.50
99,412.00

50,400.00
3,750.00

54,150.00 85,275.00
8,527.50
93,802.50
93,802.00

36,450.00
3,750.00

40,200.00 71,325.00
7,132.50
78,457.50
78,457.00

44,550.00
3,750.00

48,300.00 79,425.00
7,942.50
87,367.50
87,367.00

Analisa Gedung - 294


Bahan Jumlah
(4) (5)

36,380.00
3,750.00

40,130.00 71,255.00
7,125.50
78,380.50
78,380.00

Analisa Gedung - 295


Bahan Jumlah
(4) (5)

44,540.00
3,750.00

48,290.00 79,415.00
7,941.50
87,356.50
87,356.00

63,000.00
3,750.00

66,750.00 97,875.00
9,787.50
107,662.50
107,662.00

55,000.00
3,750.00

58,750.00 89,875.00
8,987.50
98,862.50
98,862.00

43,500.00
3,750.00

47,250.00 78,375.00
7,837.50
86,212.50
86,212.00

Analisa Gedung - 296


Bahan Jumlah
(4) (5)

51,000.00
3,750.00

54,750.00 85,875.00
8,587.50
94,462.50
94,462.00

Analisa Gedung - 297


Bahan Jumlah
(4) (5)

43,500.00
3,750.00

47,250.00 78,375.00
7,837.50
86,212.50
86,212.00

51,000.00
3,750.00

54,750.00 85,875.00
8,587.50
94,462.50
94,462.00

41,400.00
3,750.00

45,150.00 76,275.00
7,627.50
83,902.50
83,902.00

41,400.00
3,750.00

45,150.00 76,275.00
7,627.50
83,902.50
83,902.00

Analisa Gedung - 298


Bahan Jumlah
(4) (5)

542,850.00
112,500.00
70,000.00
3,800.00

729,150.00 1,211,962.50
403,987.50
40,398.75
444,386.25
444,386.00

Analisa Gedung - 299


Bahan Jumlah
(4) (5)

40,000.00

40,000.00 54,968.75
5,496.88
60,465.63
60,465.00

- 9,450.00
945.00
10,395.00
10,395.00

- 6,270.00
627.00
6,897.00
6,897.00

- 3,487.50
348.75
3,836.25
3,836.00

22,000,000.00
172,500.00
6,400.00

22,178,900.00 22,958,400.00
2,295,840.00
25,254,240.00

Analisa Gedung - 300


Bahan Jumlah
(4) (5)
25,254,240.00

18,150,000.00
172,500.00
6,400.00

18,328,900.00 19,108,400.00
1,910,840.00
21,019,240.00
21,019,240.00

Analisa Gedung - 301


Bahan Jumlah
(4) (5)

10,175,000.00
172,500.00
6,400.00

10,353,900.00 11,133,400.00
1,113,340.00
12,246,740.00
12,246,740.00

4,785,000.00
172,500.00
6,400.00

4,963,900.00 5,743,400.00
574,340.00
6,317,740.00
6,317,740.00

8,580,000.00
172,500.00
6,400.00

8,758,900.00 9,538,400.00
953,840.00
10,492,240.00
10,492,240.00

1,603,800.00
172,500.00
6,400.00

1,782,700.00 2,562,200.00
256,220.00

Analisa Gedung - 302


Bahan Jumlah
(4) (5)
2,818,420.00
2,818,420.00

154,000.00
60,000.00
1,350.00
900.00

216,250.00 225,118.75
22,511.88
247,630.63
247,630.00

Analisa Gedung - 303


Bahan Jumlah
(4) (5)

154,000.00
49,500.00
1,350.00
900.00

205,750.00 214,618.75
21,461.88
236,080.63
236,080.00

154,000.00
27,750.00
1,350.00
900.00

184,000.00 192,868.75
19,286.88
212,155.63
212,155.00

154,000.00
13,050.00
1,350.00
900.00

169,300.00 178,168.75
17,816.88
195,985.63
195,985.00

154,000.00
23,400.00
1,350.00
900.00

Analisa Gedung - 304


Bahan Jumlah
(4) (5)

179,650.00 188,518.75
18,851.88
207,370.63
207,370.00

Analisa Gedung - 305


Bahan Jumlah
(4) (5)

127,050.00
60,000.00
1,350.00
900.00

189,300.00 198,168.75
19,816.88
217,985.63
217,985.00

127,050.00
49,500.00
1,350.00
900.00

178,800.00 187,668.75
18,766.88
206,435.63
206,435.00

127,050.00
27,750.00
1,350.00
900.00

157,050.00 165,918.75
16,591.88
182,510.63
182,510.00

127,050.00
13,050.00
1,350.00
900.00

Analisa Gedung - 306


Bahan Jumlah
(4) (5)

142,350.00 151,218.75
15,121.88
166,340.63
166,340.00

Analisa Gedung - 307


Bahan Jumlah
(4) (5)

127,050.00
23,400.00
1,350.00
900.00

152,700.00 161,568.75
16,156.88
177,725.63
177,725.00

71,225.00
60,000.00
1,350.00
900.00

133,475.00 142,343.75
14,234.38
156,578.13
156,578.00

71,225.00
49,500.00
1,350.00
900.00

122,975.00 131,843.75
13,184.38
145,028.13
145,028.00

71,225.00
27,750.00
1,350.00
900.00

Analisa Gedung - 308


Bahan Jumlah
(4) (5)

101,225.00 110,093.75
11,009.38
121,103.13
121,103.00

Analisa Gedung - 309


Bahan Jumlah
(4) (5)

71,225.00
13,050.00
1,350.00
900.00

86,525.00 95,393.75
9,539.38
104,933.13
104,933.00

71,225.00
23,400.00
1,350.00
900.00

96,875.00 105,743.75
10,574.38
116,318.13
116,318.00

33,495.00
60,000.00
1,350.00
900.00

95,745.00 104,613.75
10,461.38
115,075.13
115,075.00

33,495.00
49,500.00
1,350.00
900.00

Analisa Gedung - 310


Bahan Jumlah
(4) (5)

85,245.00 94,113.75
9,411.38
103,525.13
103,525.00

Analisa Gedung - 311


Bahan Jumlah
(4) (5)

33,495.00
27,750.00
1,350.00
900.00

63,495.00 72,363.75
7,236.38
79,600.13
79,600.00

33,495.00
13,050.00
1,350.00
900.00

48,795.00 57,663.75
5,766.38
63,430.13
63,430.00

33,495.00
23,400.00
1,350.00
900.00

59,145.00 68,013.75
6,801.38
74,815.13
74,815.00

60,060.00
60,000.00
1,350.00
900.00

Analisa Gedung - 312


Bahan Jumlah
(4) (5)

122,310.00 131,178.75
13,117.88
144,296.63
144,296.00

Analisa Gedung - 313


Bahan Jumlah
(4) (5)

60,060.00
49,500.00
1,350.00
900.00

111,810.00 120,678.75
12,067.88
132,746.63
132,746.00

60,060.00
27,750.00
1,350.00
900.00

90,060.00 98,928.75
9,892.88
108,821.63
108,821.00

60,060.00
13,050.00
1,350.00
900.00

75,360.00 84,228.75
8,422.88
92,651.63
92,651.00

60,060.00
23,400.00
1,350.00
900.00

Analisa Gedung - 314


Bahan Jumlah
(4) (5)

85,710.00 94,578.75
9,457.88
104,036.63
104,036.00

Analisa Gedung - 315


Bahan Jumlah
(4) (5)

13,860.00
60,000.00
1,350.00
900.00

76,110.00 84,978.75
8,497.88
93,476.63
93,476.00

13,860.00
49,500.00
1,350.00
900.00

65,610.00 74,478.75
7,447.88
81,926.63
81,926.00

13,860.00
27,750.00
1,350.00
900.00

43,860.00 52,728.75
5,272.88
58,001.63
58,001.00

13,860.00
13,050.00
1,350.00
900.00

Analisa Gedung - 316


Bahan Jumlah
(4) (5)

29,160.00 38,028.75
3,802.88
41,831.63
41,831.00

Analisa Gedung - 317


Bahan Jumlah
(4) (5)

13,860.00
23,400.00
1,350.00
900.00

39,510.00 48,378.75
4,837.88
53,216.63
53,216.00

154,000.00
96,000.00
1,350.00
900.00

252,250.00 261,118.75
26,111.88
287,230.63
287,230.00

154,000.00
79,200.00
1,350.00
900.00

235,450.00 244,318.75
24,431.88
268,750.63
268,750.00

154,000.00
44,400.00
1,350.00
900.00

Analisa Gedung - 318


Bahan Jumlah
(4) (5)

200,650.00 209,518.75
20,951.88
230,470.63
230,470.00

Analisa Gedung - 319


Bahan Jumlah
(4) (5)

154,000.00
20,880.00
1,350.00
900.00

177,130.00 185,998.75
18,599.88
204,598.63
204,598.00

154,000.00
37,440.00
1,350.00
900.00

193,690.00 202,558.75
20,255.88
222,814.63
222,814.00

127,050.00
96,000.00
1,350.00
900.00

225,300.00 234,168.75
23,416.88
257,585.63
257,585.00

127,050.00
79,200.00
1,350.00
900.00

Analisa Gedung - 320


Bahan Jumlah
(4) (5)

208,500.00 217,368.75
21,736.88
239,105.63
239,105.00

Analisa Gedung - 321


Bahan Jumlah
(4) (5)

127,050.00
44,400.00
1,350.00
900.00

173,700.00 182,568.75
18,256.88
200,825.63
200,825.00

127,050.00
20,880.00
1,350.00
900.00

150,180.00 159,048.75
15,904.88
174,953.63
174,953.00

127,050.00
37,440.00
1,350.00
900.00

166,740.00 175,608.75
17,560.88
193,169.63
193,169.00

71,225.00
96,000.00
1,350.00
900.00

Analisa Gedung - 322


Bahan Jumlah
(4) (5)

169,475.00 178,343.75
17,834.38
196,178.13
196,178.00

Analisa Gedung - 323


Bahan Jumlah
(4) (5)

71,225.00
79,200.00
1,350.00
900.00

152,675.00 161,543.75
16,154.38
177,698.13
177,698.00

71,225.00
44,400.00
1,350.00
900.00

117,875.00 126,743.75
12,674.38
139,418.13
139,418.00

71,225.00
20,880.00
1,350.00
900.00

94,355.00 103,223.75
10,322.38
113,546.13
113,546.00

71,225.00
37,440.00
1,350.00
900.00

Analisa Gedung - 324


Bahan Jumlah
(4) (5)

110,915.00 119,783.75
11,978.38
131,762.13
131,762.00

Analisa Gedung - 325


Bahan Jumlah
(4) (5)

33,495.00
96,000.00
1,350.00
900.00

131,745.00 140,613.75
14,061.38
154,675.13
154,675.00

33,495.00
79,200.00
1,350.00
900.00

114,945.00 123,813.75
12,381.38
136,195.13
136,195.00

33,495.00
44,400.00
1,350.00
900.00

80,145.00 89,013.75
8,901.38
97,915.13
97,915.00

33,495.00
20,880.00
1,350.00
900.00

Analisa Gedung - 326


Bahan Jumlah
(4) (5)

56,625.00 65,493.75
6,549.38
72,043.13
72,043.00

Analisa Gedung - 327


Bahan Jumlah
(4) (5)

33,495.00
37,440.00
1,350.00
900.00

73,185.00 82,053.75
8,205.38
90,259.13
90,259.00

60,060.00
96,000.00
1,350.00
900.00

158,310.00 167,178.75
16,717.88
183,896.63
183,896.00

60,060.00
79,200.00
1,350.00
900.00

141,510.00 150,378.75
15,037.88
165,416.63
165,416.00

60,060.00
44,400.00
1,350.00
900.00

Analisa Gedung - 328


Bahan Jumlah
(4) (5)

106,710.00 115,578.75
11,557.88
127,136.63
127,136.00

Analisa Gedung - 329


Bahan Jumlah
(4) (5)

60,060.00
20,880.00
1,350.00
900.00

83,190.00 92,058.75
9,205.88
101,264.63
101,264.00

60,060.00
37,440.00
1,350.00
900.00

99,750.00 108,618.75
10,861.88
119,480.63
119,480.00

13,860.00
96,000.00
1,350.00
900.00

112,110.00 120,978.75
12,097.88
133,076.63
133,076.00

13,860.00
79,200.00
1,350.00
900.00

Analisa Gedung - 330


Bahan Jumlah
(4) (5)

95,310.00 104,178.75
10,417.88
114,596.63
114,596.00

Analisa Gedung - 331


Bahan Jumlah
(4) (5)

13,860.00
44,400.00
1,350.00
900.00

60,510.00 69,378.75
6,937.88
76,316.63
76,316.00

13,860.00
20,880.00
1,350.00
900.00

36,990.00 45,858.75
4,585.88
50,444.63
50,444.00

13,860.00
37,440.00
1,350.00
900.00

53,550.00 62,418.75
6,241.88
68,660.63
68,660.00

22,000,000.00

Analisa Gedung - 332


Bahan Jumlah
(4) (5)
22,000,000.00 23,274,250.00
2,327,425.00
25,601,675.00
25,601,675.00

18,150,000.00

18,150,000.00 19,424,250.00
1,942,425.00
21,366,675.00
21,366,675.00

Analisa Gedung - 333


Bahan Jumlah
(4) (5)

11,100,000.00

11,100,000.00 12,279,250.00
1,227,925.00
13,507,175.00
13,507,175.00

5,220,000.00

5,220,000.00 6,399,250.00
639,925.00
7,039,175.00
7,039,175.00

9,360,000.00

9,360,000.00 10,539,250.00
1,053,925.00
11,593,175.00
11,593,175.00

431,200.00
270.00
3,300.00
69,500.00

504,270.00 631,695.00
63,169.50
694,864.50
694,864.00

Analisa Gedung - 334


Bahan Jumlah
(4) (5)
366,520.00
270.00
3,300.00
69,500.00

439,590.00 567,015.00
56,701.50
623,716.50
623,716.00

Analisa Gedung - 335


Bahan Jumlah
(4) (5)

156,800.00
270.00
3,300.00
69,500.00

229,870.00 357,295.00
35,729.50
393,024.50
393,024.00

93,100.00
270.00
3,300.00
69,500.00

166,170.00 293,595.00
29,359.50
322,954.50
322,954.00

160,720.00
270.00
3,300.00
69,500.00

233,790.00 361,215.00
36,121.50
397,336.50
397,336.00

770,000.00

770,000.00 904,900.00

Analisa Gedung - 336


Bahan Jumlah
(4) (5)
90,490.00
995,390.00
995,390.00

654,500.00

654,500.00 789,400.00
78,940.00
868,340.00
868,340.00

Analisa Gedung - 337


Bahan Jumlah
(4) (5)

280,000.00

280,000.00 414,900.00
41,490.00
456,390.00
456,390.00

166,250.00

166,250.00 301,150.00
30,115.00
331,265.00
331,265.00

287,000.00

287,000.00 421,900.00
42,190.00
464,090.00
464,090.00

880,000.00

880,000.00 1,048,625.00
104,862.50
1,153,487.50
1,153,487.00

748,000.00

Analisa Gedung - 338


Bahan Jumlah
(4) (5)

748,000.00 916,625.00
91,662.50
1,008,287.50
1,008,287.00

320,000.00

320,000.00 488,625.00
48,862.50
537,487.50
537,487.00

Analisa Gedung - 339


Bahan Jumlah
(4) (5)

190,000.00

190,000.00 358,625.00
35,862.50
394,487.50
394,487.00

328,000.00

328,000.00 496,625.00
49,662.50
546,287.50
546,287.00

1,408,000.00

1,408,000.00 1,614,750.00
161,475.00
1,776,225.00
1,776,225.00

1,196,800.00

1,196,800.00 1,403,550.00
140,355.00
1,543,905.00
1,543,905.00

512,000.00

Analisa Gedung - 340


Bahan Jumlah
(4) (5)

512,000.00 706,875.00
70,687.50
777,562.50
777,562.00

304,000.00

304,000.00 498,875.00
49,887.50
548,762.50
548,762.00

Analisa Gedung - 341


Bahan Jumlah
(4) (5)

524,800.00

524,800.00 719,675.00
71,967.50
791,642.50
791,642.00

240,000.00
900.00

240,900.00 259,631.25
25,963.13
285,594.38
285,594.00

198,000.00
900.00

198,900.00 217,631.25
21,763.13
239,394.38
239,394.00

111,000.00
900.00

111,900.00 130,631.25
13,063.13
143,694.38
143,694.00

Analisa Gedung - 342


Bahan Jumlah
(4) (5)
52,200.00
900.00

53,100.00 71,831.25
7,183.13
79,014.38
79,014.00

Analisa Gedung - 343


Bahan Jumlah
(4) (5)

93,600.00
900.00

94,500.00 113,231.25
11,323.13
124,554.38
124,554.00

260,000.00
1,080.00

261,080.00 281,608.75
28,160.88
309,769.63
309,769.00

214,500.00
1,080.00

215,580.00 236,108.75
23,610.88
259,719.63
259,719.00

120,250.00
1,080.00

121,330.00 141,858.75
14,185.88
156,044.63
156,044.00

Analisa Gedung - 344


Bahan Jumlah
(4) (5)

56,550.00
1,080.00

57,630.00 78,158.75
7,815.88
85,974.63
85,974.00

Analisa Gedung - 345


Bahan Jumlah
(4) (5)

101,400.00
1,080.00

102,480.00 123,008.75
12,300.88
135,309.63
135,309.00

11,000.00
140.00

11,140.00 15,936.25
1,593.63
17,529.88
17,529.00

11,000.00
5,200.00
140.00
110.00

16,450.00 21,246.25
2,124.63
23,370.88
23,370.00

240,000.00
660.00
11,000.00

251,660.00 275,187.50
27,518.75
302,706.25

Analisa Gedung - 346


Bahan Jumlah
(4) (5)
302,706.00

198,000.00
660.00
11,000.00

209,660.00 233,187.50
23,318.75
256,506.25
256,506.00

Analisa Gedung - 347


Bahan Jumlah
(4) (5)

111,000.00
660.00
11,000.00

122,660.00 146,187.50
14,618.75
160,806.25
160,806.00

52,200.00
660.00
11,000.00

63,860.00 87,387.50
8,738.75
96,126.25
96,126.00

93,600.00
660.00
11,000.00

105,260.00 128,787.50
12,878.75
141,666.25
141,666.00

240,000.00
660.00
11,000.00
5,200.00
140.00
110.00

Analisa Gedung - 348


Bahan Jumlah
(4) (5)

257,110.00 280,637.50
28,063.75
308,701.25
308,701.00

Analisa Gedung - 349


Bahan Jumlah
(4) (5)

198,000.00
660.00
11,000.00
5,200.00
140.00
110.00

215,110.00 238,637.50
23,863.75
262,501.25
262,501.00

111,000.00
660.00
11,000.00
5,200.00
140.00
110.00

128,110.00 151,637.50
15,163.75
166,801.25
166,801.00

52,200.00
660.00
11,000.00
5,200.00
140.00
110.00

69,310.00 92,837.50
9,283.75
102,121.25
102,121.00

Analisa Gedung - 350


Bahan Jumlah
(4) (5)

93,600.00
660.00
11,000.00
5,200.00
140.00
110.00

110,710.00 134,237.50
13,423.75
147,661.25
147,661.00

Analisa Gedung - 351


Bahan Jumlah
(4) (5)

260,000.00
19,800.00
500.00
1,575.00
900.00
1,000.00
1,080.00

284,855.00 313,250.00
31,325.00
344,575.00
344,575.00

214,500.00
19,800.00
500.00
1,575.00
900.00
1,000.00
1,080.00

239,355.00 267,750.00
26,775.00
294,525.00
294,525.00

120,250.00
19,800.00
500.00
1,575.00
900.00
1,000.00
1,080.00

145,105.00 173,500.00
17,350.00
190,850.00

Analisa Gedung - 352


Bahan Jumlah
(4) (5)
190,850.00

56,550.00
19,800.00
500.00
1,575.00
900.00
1,000.00
1,080.00

81,405.00 109,800.00
10,980.00
120,780.00
120,780.00

Analisa Gedung - 353


Bahan Jumlah
(4) (5)

101,400.00
19,800.00
500.00
1,575.00
900.00
1,000.00
1,080.00

126,255.00 154,650.00
15,465.00
170,115.00
170,115.00

42,750.00
19,800.00
500.00
1,575.00
900.00
1,500.00
2,500.00

69,525.00 97,920.00
9,792.00
107,712.00
107,712.00

260,000.00
16,632.00
500.00
1,575.00
900.00
1,000.00
1,080.00

281,687.00 310,082.00
31,008.20
341,090.20

Analisa Gedung - 354


Bahan Jumlah
(4) (5)
341,090.00

214,500.00
16,632.00
500.00
1,575.00
900.00
1,000.00
1,080.00

236,187.00 264,582.00
26,458.20
291,040.20
291,040.00

Analisa Gedung - 355


Bahan Jumlah
(4) (5)

120,250.00
16,632.00
500.00
1,575.00
900.00
1,000.00
1,080.00

141,937.00 170,332.00
17,033.20
187,365.20
187,365.00

56,550.00
16,632.00
500.00
1,575.00
900.00
1,000.00
1,080.00

78,237.00 106,632.00
10,663.20
117,295.20
117,295.00

101,400.00
16,632.00
500.00
1,575.00
900.00
1,000.00
1,080.00

123,087.00 151,482.00
15,148.20
166,630.20

Analisa Gedung - 356


Bahan Jumlah
(4) (5)
166,630.00

42,750.00
16,632.00
500.00
1,575.00
900.00
1,500.00
2,500.00

66,357.00 94,752.00
9,475.20
104,227.20
104,227.00

Analisa Gedung - 357


Bahan Jumlah
(4) (5)

72,000.00
1,425.00
2,500.00
187,500.00

263,425.00 295,281.25
29,528.13
324,809.38
324,809.00

4,400.00
2,450.00
1,050.00

7,900.00 14,112.50
1,411.25
15,523.75
15,523.00

8,800.00
3,062.50
1,320.00

13,182.50 19,395.00
1,939.50
21,334.50
21,334.00

16,500.00
3,675.00
1,590.00

21,765.00 28,111.25

Analisa Gedung - 358


Bahan Jumlah
(4) (5)
2,811.13
30,922.38
30,922.00

6,050.00
110.00

6,160.00 10,677.50
1,067.75
11,745.25
11,745.00

Analisa Gedung - 359


Bahan Jumlah
(4) (5)

105,600.00
540.00

106,140.00 115,127.50
11,512.75
126,640.25
126,640.00

132,000.00
540.00

132,540.00 141,527.50
14,152.75
155,680.25
155,680.00

158,400.00
450.00

158,850.00 173,337.50
17,333.75
190,671.25
190,671.00

242,000.00
450.00

242,450.00 258,087.50
25,808.75
283,896.25
283,896.00

Analisa Gedung - 360


Bahan Jumlah
(4) (5)

319,000.00
540.00

319,540.00 338,271.25
33,827.13
372,098.38
372,098.00

Analisa Gedung - 361


Bahan Jumlah
(4) (5)

189,200.00
540.00

189,740.00 198,727.50
19,872.75
218,600.25
218,600.00

89,760.00
540.00

90,300.00 99,287.50
9,928.75
109,216.25
109,216.00

112,200.00
540.00

112,740.00 121,727.50
12,172.75
133,900.25
133,900.00

134,640.00
450.00

135,090.00 149,577.50
14,957.75
164,535.25
164,535.00

Analisa Gedung - 362


Bahan Jumlah
(4) (5)

205,700.00
450.00

206,150.00 221,787.50
22,178.75
243,966.25
243,966.00

Analisa Gedung - 363


Bahan Jumlah
(4) (5)

271,150.00
540.00

271,690.00 290,421.25
29,042.13
319,463.38
319,463.00

160,820.00
540.00

161,360.00 170,347.50
17,034.75
187,382.25
187,382.00

38,400.00
540.00

38,940.00 47,927.50
4,792.75
52,720.25
52,720.00

48,000.00
540.00

48,540.00 57,527.50
5,752.75
63,280.25
63,280.00

Analisa Gedung - 364


Bahan Jumlah
(4) (5)

57,600.00
450.00

58,050.00 72,287.50
7,228.75
79,516.25
79,516.00

Analisa Gedung - 365


Bahan Jumlah
(4) (5)

88,000.00
450.00

88,450.00 104,087.50
10,408.75
114,496.25
114,496.00

116,000.00
540.00

116,540.00 135,271.25
13,527.13
148,798.38
148,798.00

68,800.00
540.00

69,340.00 78,327.50
7,832.75
86,160.25
86,160.00

22,800.00
540.00

23,340.00 32,327.50
3,232.75
35,560.25
35,560.00

Analisa Gedung - 366


Bahan Jumlah
(4) (5)

28,500.00
540.00

29,040.00 38,027.50
3,802.75
41,830.25
41,830.00

Analisa Gedung - 367


Bahan Jumlah
(4) (5)

34,200.00
450.00

34,650.00 48,887.50
4,888.75
53,776.25
53,776.00

52,250.00
450.00

52,700.00 68,337.50
6,833.75
75,171.25
75,171.00

68,875.00
540.00

69,415.00 88,146.25
8,814.63
96,960.88
96,960.00

40,850.00
540.00

41,390.00 50,377.50
5,037.75
55,415.25
55,415.00

Analisa Gedung - 368


Bahan Jumlah
(4) (5)

39,360.00
540.00

39,900.00 48,887.50
4,888.75
53,776.25
53,776.00

Analisa Gedung - 369


Bahan Jumlah
(4) (5)

49,200.00
540.00

49,740.00 58,727.50
5,872.75
64,600.25
64,600.00

59,040.00
450.00

59,490.00 73,727.50
7,372.75
81,100.25
81,100.00

90,200.00
450.00

90,650.00 106,287.50
10,628.75
116,916.25
116,916.00

118,900.00
540.00

119,440.00 138,171.25
13,817.13
151,988.38
151,988.00

Analisa Gedung - 370


Bahan Jumlah
(4) (5)

70,520.00
540.00

71,060.00 80,047.50
8,004.75
88,052.25
88,052.00

Analisa Gedung - 371


Bahan Jumlah
(4) (5)

500,000.00
10,000.00
2,700.00

512,700.00 629,625.00
62,962.50
692,587.50
692,587.00

412,500.00
10,000.00
2,700.00

425,200.00 542,125.00
54,212.50
596,337.50
596,337.00

231,250.00
10,000.00
2,700.00

243,950.00 360,875.00
36,087.50
396,962.50
396,962.00

108,750.00
10,000.00
2,700.00

121,450.00 238,375.00

Analisa Gedung - 372


Bahan Jumlah
(4) (5)
23,837.50
262,212.50
262,212.00

195,000.00
10,000.00
2,700.00

207,700.00 324,625.00
32,462.50
357,087.50
357,087.00

Analisa Gedung - 373


Bahan Jumlah
(4) (5)

88,000.00
180.00

88,180.00 93,426.50
9,342.65
102,769.15
102,769.00

74,800.00
180.00

74,980.00 80,226.50
8,022.65
88,249.15
88,249.00

32,000.00
180.00

32,180.00 37,426.50
3,742.65
41,169.15
41,169.00

19,000.00
180.00

19,180.00 24,426.50
2,442.65
26,869.15
26,869.00

Analisa Gedung - 374


Bahan Jumlah
(4) (5)

32,800.00
180.00

32,980.00 38,226.50
3,822.65
42,049.15
42,049.00

Analisa Gedung - 375


Bahan Jumlah
(4) (5)

22,000.00
135.00
211,200.00
8,750.00

242,085.00 267,644.38
26,764.44
294,408.81
294,408.00

22,000.00
135.00
179,520.00
8,750.00

210,405.00 235,964.38
23,596.44
259,560.81
259,560.00

22,000.00
135.00
76,800.00
8,750.00

107,685.00 133,244.38
13,324.44
146,568.81
146,568.00

22,000.00
135.00
45,600.00
8,750.00

Analisa Gedung - 376


Bahan Jumlah
(4) (5)

76,485.00 102,044.38
10,204.44
112,248.81
112,248.00

Analisa Gedung - 377


Bahan Jumlah
(4) (5)

22,000.00
135.00
78,720.00
8,750.00

109,605.00 135,164.38
13,516.44
148,680.81
148,680.00

22,000.00
135.00
418,000.00
10,500.00

450,635.00 472,344.38
47,234.44
519,578.81
519,578.00

22,000.00
135.00
355,300.00
8,750.00

386,185.00 407,894.38
40,789.44
448,683.81
448,683.00

22,000.00
135.00
152,000.00
8,750.00

Analisa Gedung - 378


Bahan Jumlah
(4) (5)

182,885.00 204,594.38
20,459.44
225,053.81
225,053.00

Analisa Gedung - 379


Bahan Jumlah
(4) (5)

22,000.00
135.00
90,250.00
8,750.00

121,135.00 142,844.38
14,284.44
157,128.81
157,128.00

22,000.00
135.00
155,800.00
8,750.00

186,685.00 208,394.38
20,839.44
229,233.81
229,233.00

200,000.00
90,000.00

290,000.00 560,537.50

29,000.00 56,053.75
5,605.38
61,659.13
61,659.00

13,200.00
900.00
155,800.00
6,250.00

Analisa Gedung - 380


Bahan Jumlah
(4) (5)

176,150.00 194,584.38
19,458.44
214,042.81
214,042.00

Analisa Gedung - 381


Bahan Jumlah
(4) (5)

11,550.00
900.00
155,800.00
6,250.00

174,500.00 192,934.38
19,293.44
212,227.81
212,227.00

180,375.00
56,000.00
800.00

237,175.00 269,612.50
26,961.25
296,573.75
296,573.00

152,100.00
57,400.00
800.00

210,300.00 242,737.50
24,273.75
267,011.25
267,011.00

390,000.00
154,000.00
800.00

Analisa Gedung - 382


Bahan Jumlah
(4) (5)
544,800.00 577,237.50
57,723.75
634,961.25
634,961.00

321,750.00
130,900.00
800.00

453,450.00 485,887.50
48,588.75
534,476.25
534,476.00

Analisa Gedung - 383


Bahan Jumlah
(4) (5)

84,825.00
33,250.00
800.00

118,875.00 151,312.50
15,131.25
166,443.75
166,443.00

180,375.00
56,000.00
800.00
6,160.00

243,335.00 275,772.50
27,577.25
303,349.75
303,349.00

180,375.00
56,000.00
800.00
6,160.00
41,250.00

284,585.00 323,560.00
32,356.00
355,916.00
355,916.00

16,500.00
400.00

Analisa Gedung - 384


Bahan Jumlah
(4) (5)

16,900.00 21,774.25
2,177.43
23,951.68
23,951.00

Analisa Gedung - 385


Bahan Jumlah
(4) (5)

97,500.00
60,900.00
17,400.00
13,050.00

188,850.00 195,070.00
19,507.00
214,577.00
214,577.00

27,500.00

27,500.00 39,950.00
3,995.00
43,945.00
43,945.00

27,500.00

27,500.00 43,687.50
4,368.75
48,056.25
48,056.00

24,750.00

24,750.00 37,200.00
3,720.00
40,920.00
40,920.00

Analisa Gedung - 386


Bahan Jumlah
(4) (5)

24,750.00

24,750.00 40,937.50
4,093.75
45,031.25
45,031.00

Analisa Gedung - 387


Bahan Jumlah
(4) (5)

39,780.00

39,780.00 52,230.00
5,223.00
57,453.00
57,453.00

39,780.00

39,780.00 55,967.50
5,596.75
61,564.25
61,564.00

65,250.00

65,250.00 77,700.00
7,770.00
85,470.00
85,470.00

ah tingkat
65,250.00

65,250.00 81,437.50
8,143.75
89,581.25
89,581.00

8,250.00
1,102.00
2,204.00
1,822.70

Analisa Gedung - 388


Bahan Jumlah
(4) (5)

13,378.70 38,278.70
3,827.87
42,106.57
42,106.00

Analisa Gedung - 389


Bahan Jumlah
(4) (5)

12,300.00
1,102.00
2,204.00
1,822.70

17,428.70 42,328.70
4,232.87
46,561.57
46,561.00

17,040.00
1,102.00
2,204.00
1,822.70

22,168.70 47,068.70
4,706.87
51,775.57
51,775.00

54,000.00
1,102.00
2,204.00
1,822.70

59,128.70 84,028.70
8,402.87
92,431.57
92,431.00

31,480.00
1,122.00

Analisa Gedung - 390


Bahan Jumlah
(4) (5)

32,602.00 41,844.50
4,184.45
46,028.95
46,028.00

33,972.00
1,122.00

35,094.00 44,336.50
4,433.65
48,770.15
48,770.00

Analisa Gedung - 391


Bahan Jumlah
(4) (5)

30,198.00
1,122.00

31,320.00 40,227.50
4,022.75
44,250.25
44,250.00

33,967.50
1,122.00

35,089.50 43,997.00
4,399.70
48,396.70
48,396.00

24,972.50
1,122.00

26,094.50 35,002.00
3,500.20
38,502.20
38,502.00

29,085.00
1,122.00

30,207.00 39,114.50
3,911.45
43,025.95
43,025.00

Analisa Gedung - 392


Bahan Jumlah
(4) (5)
26,840.00
1,122.00

27,962.00 36,727.00
3,672.70
40,399.70
40,399.00

Analisa Gedung - 393


Bahan Jumlah
(4) (5)

29,325.00
1,122.00

30,447.00 39,212.00
3,921.20
43,133.20
43,133.00

28,760.00
1,122.00

29,882.00 38,647.00
3,864.70
42,511.70
42,511.00

41,747.10
1,122.00

42,869.10 51,634.10
5,163.41
56,797.51
56,797.00

38,570.00
1,122.00

39,692.00 48,457.00
4,845.70
53,302.70
53,302.00

Analisa Gedung - 394


Bahan Jumlah
(4) (5)
41,521.90
1,122.00

42,643.90 51,408.90
5,140.89
56,549.79
56,549.00

Analisa Gedung - 395


Bahan Jumlah
(4) (5)

38,700.20
1,122.00

39,822.20 48,587.20
4,858.72
53,445.92
53,445.00

38,583.30
1,122.00

39,705.30 48,470.30
4,847.03
53,317.33
53,317.00

69,600.00
4,500.00

74,100.00 83,817.50
8,381.75
92,199.25
92,199.00

60,900.00
4,500.00

65,400.00 75,117.50
7,511.75
82,629.25
82,629.00

Analisa Gedung - 396


Bahan Jumlah
(4) (5)
59,450.00
4,500.00

63,950.00 73,667.50
7,366.75
81,034.25
81,034.00

Analisa Gedung - 397


Bahan Jumlah
(4) (5)

60,000.00
4,500.00

64,500.00 74,217.50
7,421.75
81,639.25
81,639.00

60,000.00
4,500.00

64,500.00 74,217.50
7,421.75
81,639.25
81,639.00

60,000.00
4,500.00

64,500.00 74,217.50
7,421.75
81,639.25
81,639.00

27,500.00
4,500.00

32,000.00 43,465.00
4,346.50
47,811.50
47,811.00

Analisa Gedung - 398


Bahan Jumlah
(4) (5)
27,500.00
4,500.00

32,000.00 41,717.50
4,171.75
45,889.25
45,889.00

Analisa Gedung - 399


Bahan Jumlah
(4) (5)

13,200.00
440.00

13,640.00 22,900.00
2,290.00
25,190.00
25,190.00

97,308.00
4,000.00

101,308.00 113,605.50
11,360.55
124,966.05
124,966.00

61,200.00
4,800.00

66,000.00 78,297.50
7,829.75
86,127.25
86,127.00

38,500.00
1,000.00

39,500.00 56,742.50
5,674.25
62,416.75
62,416.00

Analisa Gedung - 400


Bahan Jumlah
(4) (5)
47,250.00
190.00

47,440.00 71,187.50
7,118.75
78,306.25
78,306.00

Analisa Gedung - 401


Bahan Jumlah
(4) (5)

30,000.00
380.00

30,380.00 82,355.00
8,235.50
90,590.50
90,590.00

26,250.00

26,250.00 34,505.00
3,450.50
37,955.50
37,955.00

236,250.00
87,500.00
10,800.00

334,550.00 377,043.75
37,704.38
414,748.13
414,748.00

165,750.00
5,700.00

171,450.00 387,200.00
17,145.00 38,720.00
3,872.00
42,592.00

Analisa Gedung - 402


Bahan Jumlah
(4) (5)
42,592.00
11,430.00 25,813.33
2,581.33
28,394.67
28,394.00
5,715.00 12,906.67
1,290.67
14,197.33
14,197.00

Analisa Gedung - 403


Bahan Jumlah
(4) (5)

750.00

750.00 6,118.75
611.88
6,730.63
6,730.00

600.00

600.00 5,968.75
596.88
6,565.63
6,565.00

800.00
200.00
77.00

1,077.00 4,475.75
447.58
4,923.33
4,923.00

1,800.00
5,440.00
5,440.00

12,680.00 18,773.75
1,877.38
20,651.13
20,651.00

is cat penutup
2,400.00
1,800.00
5,440.00
8,320.00

Analisa Gedung - 404


Bahan Jumlah
(4) (5)

17,960.00 24,623.75
2,462.38
27,086.13
27,086.00

Analisa Gedung - 405


Bahan Jumlah
(4) (5)

is cat penutup
2,400.00
1,800.00
5,440.00
11,200.00

20,840.00 28,051.25
2,805.13
30,856.38
30,856.00

9,900.00

9,900.00 16,931.25
1,693.13
18,624.38
18,624.00

7,500.00
18,600.00
6,000.00

32,100.00 35,488.75
3,548.88
39,037.63
39,037.00

1,225.00

1,225.00 5,010.00
501.00
5,511.00
5,511.00

1,875.00
500.00

Analisa Gedung - 406


Bahan Jumlah
(4) (5)
300.00
80.00

2,755.00 15,993.75
1,599.38
17,593.13
17,593.00

Analisa Gedung - 407


Bahan Jumlah
(4) (5)

penutup)
1,050.00
1,550.00
4,030.00

6,630.00 10,409.75
1,040.98
11,450.73
11,450.00

1,860.00
2,790.00

4,650.00 7,722.75
772.28
8,495.03
8,495.00

2,720.00
18,000.00

20,720.00 24,499.75
2,449.98
26,949.73
26,949.00

500.00

500.00 3,572.75
357.28
3,930.03
3,930.00

Analisa Gedung - 408


Bahan Jumlah
(4) (5)
300.00
125.00
1,000.00
75.00

1,500.00 6,915.75
691.58
7,607.33
7,607.00

Analisa Gedung - 409


Bahan Jumlah
(4) (5)

1,000.00
150.00

1,150.00 2,903.75
290.38
3,194.13
3,194.00

2,171.00
7,800.00
1,950.00

11,921.00 19,132.25
1,913.23
21,045.48
21,045.00

48,000.00
12,000.00

60,000.00 69,408.75
6,940.88
76,349.63
76,349.00

2,000.00
80.00

2,080.00 12,655.00
1,265.50
13,920.50
13,920.00

Analisa Gedung - 410


Bahan Jumlah
(4) (5)

2,000.00
80.00
1,000.00

3,080.00 21,886.25
2,188.63
24,074.88
24,074.00

Analisa Gedung - 411


Bahan Jumlah
(4) (5)

2,800.00

2,800.00 6,537.50
653.75
7,191.25
7,191.00

25,500.00
741.00

26,241.00 48,116.00
4,811.60
52,927.60
52,927.00

15,120.00

15,120.00 18,899.75
1,889.98
20,789.73
20,789.00

- 194,000.00
19,400.00
213,400.00
213,400.00

- 93,500.00
9,350.00
102,850.00

Analisa Gedung - 412


Bahan Jumlah
(4) (5)
102,850.00

- 293,750.00
29,375.00
323,125.00
323,125.00

Analisa Gedung - 413


Bahan Jumlah
(4) (5)

- 74,750.00

- 7,475.00
747.50
8,222.50
8,222.00

- 49,687.50

- 4,968.75
496.88
5,465.63
5,465.00

- 74,750.00

- 7,475.00
747.50
8,222.50
8,222.00

- 57,500.00

- 5,750.00
575.00
6,325.00
6,325.00

- 106,250.00

- 10,625.00
1,062.50

Analisa Gedung - 414


Bahan Jumlah
(4) (5)
11,687.50
11,687.00

- 74,750.00

- 7,475.00
747.50
8,222.50
8,222.00

Analisa Gedung - 415


Bahan Jumlah
(4) (5)

k digunakan lagi

- 464,500.00
46,450.00
510,950.00
510,950.00

digunakan lagi

- 44,500.00
4,450.00
48,950.00
48,950.00

- 779,500.00
77,950.00
857,450.00
857,450.00

35,000.00

35,000.00 68,712.50
6,871.25
75,583.75
75,583.00

35,000.00

35,000.00 94,962.50
9,496.25
104,458.75
104,458.00

Analisa Gedung - 416


Bahan Jumlah
(4) (5)

19,500.00
#REF!

#REF! #REF!
#REF!
#REF!
#REF!

Analisa Gedung - 417


Bahan Jumlah
(4) (5)

1,250,000.00
75,000.00

1,325,000.00 1,497,647.50
149,764.75
1,647,412.25
1,647,412.00

75,000.00
7,176.00
1,450.00

83,626.00 264,976.00
26,497.60
291,473.60
291,473.00

25,000.00
3,500.00
7,176.00
1,450.00

37,126.00 159,101.00
15,910.10
175,011.10
175,011.00

785,000.00
235,500.00
7,176.00
1,450.00

1,029,126.00 1,118,626.00

Analisa Gedung - 418


Bahan Jumlah
(4) (5)
111,862.60
1,230,488.60
1,230,488.00

271,340.00
32,560.80
7,176.00
1,450.00

312,526.80 431,651.80
43,165.18
474,816.98
474,816.00

Analisa Gedung - 419


Bahan Jumlah
(4) (5)

275,000.00
49,500.00

324,500.00 539,875.00
53,987.50
593,862.50
593,862.00

150,000.00
30,000.00

180,000.00 230,875.00
23,087.50
253,962.50
253,962.00

825,000.00
99,000.00

924,000.00 1,317,000.00
131,700.00
1,448,700.00
1,448,700.00

40,000.00
813.28
1,885.00
825.00

43,523.28 47,234.53
4,723.45
51,957.98
51,957.00

Analisa Gedung - 420


Bahan Jumlah
(4) (5)

56,000.00
1,040.52
2,030.00
10,500.00

69,570.52 74,693.02
7,469.30
82,162.32
82,162.00

Analisa Gedung - 421


Bahan Jumlah
(4) (5)

26,400.00
8,000.00
4,688.32
8,120.00
1,800.00

49,008.32 57,723.32
5,772.33
63,495.65
63,495.00

27,500.00
165,000.00
12,318.80
8,845.00
5,175.00

218,838.80 242,493.80
24,249.38
266,743.18
266,743.00

ggi 35 cm
43,500.00
52,624.00
10,150.00
6,300.00
20,000.00
7,200.00

139,774.00 298,280.25
29,828.03
328,108.28
328,108.00

ggi 50 cm
75,000.00

Analisa Gedung - 422


Bahan Jumlah
(4) (5)
92,092.00
18,850.00
1,800.00
32,500.00
10,800.00

231,042.00 307,632.00
30,763.20
338,395.20
338,395.00

Analisa Gedung - 423


Bahan Jumlah
(4) (5)

gg 65 cm
111,000.00
136,344.00
26,680.00
2,970.00
60,625.00
14,400.00

352,019.00 468,189.00
46,818.90
515,007.90
515,007.00

21,600.00
6,300.00

27,900.00 35,550.00
3,555.00
39,105.00
39,105.00

28,800.00
8,400.00

37,200.00 44,850.00
4,485.00
49,335.00
49,335.00

43,800.00
12,775.00

56,575.00 64,225.00

Analisa Gedung - 424


Bahan Jumlah
(4) (5)
6,422.50
70,647.50
70,647.00

84,000.00
24,500.00

108,500.00 121,491.50
12,149.15
133,640.65
133,640.00

Analisa Gedung - 425


Bahan Jumlah
(4) (5)

110,784.00
32,312.00

143,096.00 156,087.50
15,608.75
171,696.25
171,696.00

148,992.00
43,456.00

192,448.00 208,689.75
20,868.98
229,558.73
229,558.00

3,795.00
1,106.88

4,901.88 9,232.38
923.24
10,155.61
10,155.00

5,100.00
1,487.50

6,587.50 10,918.00
1,091.80
12,009.80
12,009.00

Analisa Gedung - 426


Bahan Jumlah
(4) (5)

6,150.00
1,793.75

7,943.75 12,274.25
1,227.43
13,501.68
13,501.00

Analisa Gedung - 427


Bahan Jumlah
(4) (5)

13,500.00
3,937.50

17,437.50 21,768.00
2,176.80
23,944.80
23,944.00

18,000.00
5,250.00

23,250.00 29,759.75
2,975.98
32,735.73
32,735.00

24,600.00
7,175.00

31,775.00 36,105.50
3,610.55
39,716.05
39,716.00

24,600.00
7,175.00

31,775.00 43,273.75
4,327.38
47,601.13
47,601.00

Analisa Gedung - 428


Bahan Jumlah
(4) (5)

40,500.00
11,812.50

52,312.50 63,811.25
6,381.13
70,192.38
70,192.00

Analisa Gedung - 429


Bahan Jumlah
(4) (5)

500,000.00
75,000.00

575,000.00 591,046.25
59,104.63
650,150.88
650,150.00

175,000.00
75,000.00
23,920.00
7,250.00

281,170.00 307,913.75
30,791.38
338,705.13
338,705.00

25,000.00
62.50

25,062.50 30,625.00
3,062.50
33,687.50
33,687.00

55,000.00

55,000.00 60,562.50
6,056.25
66,618.75
66,618.00

Analisa Gedung - 430


Bahan Jumlah
(4) (5)

9,680.00
1,600.00

11,280.00 13,949.25
1,394.93
15,344.18
15,344.00

Analisa Gedung - 431


Bahan Jumlah
(4) (5)

750,000.00

750,000.00 806,607.50
80,660.75
887,268.25
887,268.00

750,000.00

750,000.00 839,236.88
83,923.69
923,160.56
923,160.00

1,500,000.00

1,500,000.00 1,595,755.00
159,575.50
1,755,330.50
1,755,330.00

250,000.00

250,000.00 351,985.00
35,198.50
387,183.50
387,183.00

500,000.00

Analisa Gedung - 432


Bahan Jumlah
(4) (5)

500,000.00 589,234.50
58,923.45
648,157.95
648,157.00

250,000.00

250,000.00 292,790.00
29,279.00
322,069.00
322,069.00

Analisa Gedung - 433


Bahan Jumlah
(4) (5)

200,000.00

200,000.00 309,484.50
30,948.45
340,432.95
340,432.00

400,000.00

400,000.00 489,234.50
48,923.45
538,157.95
538,157.00

250,000.00

250,000.00 279,745.63
27,974.56
307,720.19
307,720.00

143,750.00

143,750.00 240,348.50
24,034.85
264,383.35
264,383.00

27,500.00
220.00
14,400.00

Analisa Gedung - 434


Bahan Jumlah
(4) (5)

42,120.00 50,893.75
5,089.38
55,983.13
55,983.00

Analisa Gedung - 435


Bahan Jumlah
(4) (5)

9,075.00
220.00
14,400.00

23,695.00 32,468.75
3,246.88
35,715.63
35,715.00

11,000.00
220.00
14,400.00

25,620.00 34,393.75
3,439.38
37,833.13
37,833.00

16,500.00
220.00
14,400.00

31,120.00 39,893.75
3,989.38
43,883.13
43,883.00

22,000.00
200.00
287.50

22,487.50 40,035.00

Analisa Gedung - 436


Bahan Jumlah
(4) (5)
4,003.50
44,038.50
44,038.00

250,000.00

250,000.00 283,742.50
28,374.25
312,116.75
312,116.00

Analisa Gedung - 437


Bahan Jumlah
(4) (5)

125,000.00

125,000.00 149,837.50
14,983.75
164,821.25
164,821.00

50,000.00

50,000.00 74,293.75
7,429.38
81,723.13
81,723.00

75,000.00

75,000.00 99,186.88
9,918.69
109,105.56
109,105.00

11,000.00

11,000.00 19,435.63
1,943.56
21,379.19
21,379.00

7,500.00

Analisa Gedung - 438


Bahan Jumlah
(4) (5)
7,500.00 13,337.50
1,333.75
14,671.25
14,671.00

3,000.00

3,000.00 14,675.00
1,467.50
16,142.50
16,142.00

Analisa Gedung - 439


Bahan Jumlah
(4) (5)

7,500.00

7,500.00 15,935.63
1,593.56
17,529.19
17,529.00

3,000.00

3,000.00 11,435.63
1,143.56
12,579.19
12,579.00

150,000.00

150,000.00 178,118.75
17,811.88
195,930.63
195,930.00

50,000.00

50,000.00 61,247.50
6,124.75
67,372.25
67,372.00

15,000.00

Analisa Gedung - 440


Bahan Jumlah
(4) (5)
15,000.00 43,118.75
4,311.88
47,430.63
47,430.00

15,000.00

15,000.00 20,623.75
2,062.38
22,686.13
22,686.00

Analisa Gedung - 441


Bahan Jumlah
(4) (5)

200,000.00

200,000.00 233,742.50
23,374.25
257,116.75
257,116.00

12,000.00

12,000.00 26,059.38
2,605.94
28,665.31
28,665.00

55,000.00

55,000.00 63,435.63
6,343.56
69,779.19
69,779.00

71,500.00

71,500.00 79,935.63
7,993.56
87,929.19
87,929.00

132,000.00

Analisa Gedung - 442


Bahan Jumlah
(4) (5)

132,000.00 140,435.63
14,043.56
154,479.19
154,479.00

330,000.00

330,000.00 338,435.63
33,843.56
372,279.19
372,279.00

Analisa Gedung - 443


Bahan Jumlah
(4) (5)

132,000.00
18,000.00

150,000.00 158,023.13
158,023.00

k berlubang

2,000.00
52,500.00

54,500.00 124,500.00

- 850,000.00

60,000.00
800.00

60,800.00 203,300.00

115,300.00 1,177,800.00
117,780.00
1,295,580.00
1,295,580.00

1,440.00

1,440.00 5,811.25

16,575.00
1,000.00

Analisa Gedung - 444


Bahan Jumlah
(4) (5)
17,575.00 247,550.00
19,015.00 253,361.25
25,336.13
278,697.38
278,697.00

3,600,000.00
4,680.00

3,604,680.00 3,973,930.00
397,393.00
4,371,323.00
4,371,323.00

Analisa Gedung - 445


Bahan Jumlah
(4) (5)

50,000.00

50,000.00 259,750.00
25,975.00
285,725.00
285,725.00

60,000.00
100,000.00
300,000.00
460,000.00 460,000.00
46,000.00
506,000.00
506,000.00

28,000.00
21,000.00
20,000.00
10,000.00
7,500.00
3,500.00
10,000.00

100,000.00 380,625.00
38,062.50
418,687.50
(A) 418,687.00

4,186.87

56,000.00
36,000.00
3,000.00
10,000.00
3,500.00
20,000.00
15,000.00
17,500.00
10,000.00
14,352.00

Analisa Gedung - 446


Bahan Jumlah
(4) (5)
21,750.00
60,000.00

267,102.00 980,227.00
98,022.70
1,078,249.70
(A) 1,078,249.00

10,782.49

Analisa Gedung - 447


Bahan Jumlah
(4) (5)

- 66,358.00
6,635.80
72,993.80
72,993.00

- 15,462.50
1,546.25
17,008.75
17,008.00

1,341,000.00
70,000.00
49,000.00
12,000.00
40,000.00
40,000.00
1,200,000.00
105,000.00
105,000.00
6,000,000.00

8,962,000.00 115,724,500.00
11,572,450.00
127,296,950.00
(A) 127,296,950.00

34.88

451.80
54.50
615.00
1,350.00

2,471.30 44,254.30
4,425.43
48,679.73

Analisa Gedung - 448


Bahan Jumlah
(4) (5)
(A) 48,679.00

48.68

980.00
4,500.00

5,480.00 204,230.00
20,423.00
224,653.00
224,653.00
(A) 449,306.00

14.98

Analisa Gedung - 449


Bahan Jumlah
(4) (5)

3,115.00
9,000.00

12,115.00 339,615.00
33,961.50
373,576.50
373,576.00
(A) 747,152.00

24.91

3,000.00
3,000.00
80.50
4,500.00
27,000.00

37,580.50 136,330.50
13,633.05
149,963.55
149,963.00
(A) 299,926.00

10.00

230.00
345.00
460.00
2,000.00
80.50

3,115.50 190,615.50
19,061.55
209,677.05
209,677.00
(A) 419,354.00

13.98

Analisa Gedung - 450


Bahan Jumlah
(4) (5)

50,000.00
5,000.00
3,200.00
56,250.00
22,500.00
7,500.00
6,000.00
5,000.00

155,450.00 218,805.00
21,880.50
240,685.50
240,685.00

Analisa Gedung - 451


Bahan Jumlah
(4) (5)

rry (Cebex 100)


4,500.00
5,000.00
2,400.00
22,500.00
7,500.00
5,000.00

46,900.00 110,255.00
11,025.50
121,280.50
121,280.00

18,298.80
3,523.50
2,902.19
2,700.00
244.80

27,669.29 35,341.04
3,534.10
38,875.14
38,875.00

36,597.60
7,047.00
5,804.37
2,700.00
244.80

52,393.77 65,037.27
6,503.73
71,541.00
71,540.00

Analisa Gedung - 452


ANALISAHARGA SATUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN GUDANG DAN BALAI PERTEMUAN


LOKASI : TENONGAN GUPIT SUKOHARJO
TAHUN : 2013

No. Macam Pekerjaan Upah

SNI 1.0000 m3 Galian tanah biasa sedalam 1 - 2 meter


6.2 0.5260 org Pekerja @ Rp. 30,000.00 15,780.00
0.0526 org Mandor @ Rp. 50,000.00 2,630.00
JUMLAH ( BELUM PPN ) 18,410.00
SNI 1.0000 m3 Urug kembali bekas galian
6.9 0.1920 org Pekerja @ Rp. 30,000.00 5,760.00
0.0190 org Mandor @ Rp. 50,000.00 950.00
JUMLAH ( BELUM PPN ) 6,710.00
SNI 1.0000 m3 Membuat beton dengan mutu K 275
6.36 400.0000 kg PC @ Rp. 1,495.00
0.4000 m 3
Pasir beton @ Rp. 143,750.00
0.8200 m3 Batu pecah 2/3 @ Rp. 172,500.00
1.0000 org Tukang batu @ Rp. 40,000.00 40,000.00
0.1000 org Kepala tukang batu @ Rp. 48,400.00 4,840.00
6.0000 org Pekerja @ Rp. 30,000.00 180,000.00
0.3000 org Mandor @ Rp. 50,000.00 15,000.00
JUMLAH ( BELUM PPN ) 239,840.00

SNI 1.0000 kg Pembesian dengan besi ulir


6.25 1.0500 kg Besi beton ulir @ Rp. 10,925.00
0.0150 kg Kawat beton @ Rp. 17,250.00
0.0070 org Tukang besi @ Rp. 41,000.00 287.00
0.0007 org Kepala tukang besi @ Rp. 49,500.00 34.65
0.0070 org Pekerja @ Rp. 30,000.00 210.00
0.0003 org Mandor @ Rp. 50,000.00 15.00
JUMLAH ( BELUM PPN ) 546.65

F.8 1.0000 m2 Cetakan beton / begisting memakai papan


0.0170 m 3
Usuk meranti @ Rp. 1,265,000.00
0.0240 m3 Papan cetakan @ Rp. 2,127,500.00
0.4000 kg Paku @ Rp. 11,500.00
0.5000 org Tukang kayu @ Rp. 41,000.00 20,500.00
0.0500 org Kep. Tk. Kayu @ Rp. 48,400.00 2,420.00
0.2000 org Pekerja @ Rp. 30,000.00 6,000.00
0.0100 org Mandor @ Rp. 50,000.00 500.00
JUMLAH ( BELUM PPN ) 29,420.00
No. Macam Pekerjaan Upah
Sup Stutwerk untuk 1 m beton, tinggi 3 - 4 m ( memakai dolken )
3

muko2 0.3500 m3 Perancah/dolken @ Rp. 2,100,000.00


hal 10.5000 org Tukang kayu @ Rp. 41,000.00 430,500.00
332 1.0500 org Kep. Tk. Kayu @ Rp. 48,400.00 50,820.00
3.5000 org Pekerja @ Rp. 30,000.00 105,000.00
0.1750 org Mandor @ Rp. 50,000.00 8,750.00
JUMLAH ( BELUM PPN ) 595,070.00

F.V 1.0000 m3 Membongkar cetakan


1.5000 org Pekerja @ Rp. 30,000.00 45,000.00
JUMLAH ( BELUM PPN ) 45,000.00
No. Macam Pekerjaan Upah

REKAPITULASI (CONTOH UNTUK 150 KG BESI)

Pekerjaan beton bertulang K 275 tanpa dolken, 150 kg besi


A. Beton cor K 275
B. Tulangan 150 kg
C. Cetakan memakai papan ( 10 m2 )
E. Membongkar cetakan
JUMLAH

REKAPITULASI (CONTOH UNTUK 150 KG BESI)

Pekerjaan beton bertulang K 275 dengan memakai dolken 150 kg besi


A. Beton cor K 275
B. Tulangan 150 kg
C. Cetakan memakai papan ( 10 m2 )
D. Stut werk / perancah
E. Membongkar cetakan
JUMLAH

REKAPITULASI (CONTOH UNTUK 125 KG BESI)

Pekerjaan beton bertulang 1:2:3 dengan memakai dolken, 125 kg besi


A. Beton cor 1pc:2ps:3kr
B. Tulangan 125 kg
C. Cetakan memakai papan ( 10 m2 )
D. Stut werk / perancah
E. Membongkar cetakan
JUMLAH

SNI 1.0000 m3 Membuat beton tumbuk, 1 Pc : 3 Ps : 5 Kr


6.1 218.0000 kg PC @ Rp. 1,495.00
0.5200 m3 Pasir beton @ Rp. 143,750.00
0.8700 m 3
Baty pecah 2/3 @ Rp. 172,500.00
0.2500 org Tukang batu @ Rp. 40,000.00 10,000.00
0.0250 org Kepala tukang batu @ Rp. 48,400.00 1,210.00
1.6500 org Pekerja @ Rp. 30,000.00 49,500.00
0.0800 org Mandor @ Rp. 50,000.00 4,000.00
JUMLAH ( BELUM PPN ) 64,710.00
SNI 1.0000 m3 Pasangan pondasi 1 Pc : 5 Ps
6.6 1.1000 m3 Batu belah 15/20 cm @ Rp. 126,500.00
03-2835-2002 136.0000 kg PC @ Rp. 1,495.00
0.5440 m3 Pasir pasang @ Rp. 126,500.00
0.6000 org Tukang batu @ Rp. 40,000.00 24,000.00
0.0600 org Kepala tukang batu @ Rp. 48,400.00 2,904.00
No. Macam Pekerjaan Upah
1.5000 org Pekerja @ Rp. 30,000.00 45,000.00
0.0750 org Mandor @ Rp. 50,000.00 3,750.00
JUMLAH ( BELUM PPN ) 75,654.00
SNI 1.0000 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 4 Ps
6.11 70.0000 bh Bata merah 5 x 11 x 22 cm @ Rp. 575.00
03-2837-2002 11.5000 kg PC @ Rp. 1,495.00
0.0430 m3 Pasir pasang @ Rp. 126,500.00
0.1000 org Tukang batu @ Rp. 40,000.00 4,000.00
0.0100 org Kepala tukang batu @ Rp. 48,400.00 484.00
0.3200 org Pekerja @ Rp. 30,000.00 9,600.00
0.0150 org Mandor @ Rp. 50,000.00 750.00
JUMLAH ( BELUM PPN ) 14,834.00
No. Macam Pekerjaan Upah
SNI 1.0000 m 2
Plesteran 1 Pc : 4 Ps, tebal 15 mm
6.4 5.2000 kg PC @ Rp. 1,495.00
03-2837-2002 0.0200 m 3
Pasir pasang @ Rp. 126,500.00
0.1500 org Tukang batu @ Rp. 40,000.00 6,000.00
0.0150 org Kepala tukang batu @ Rp. 48,400.00 726.00
0.2000 org Pekerja @ Rp. 30,000.00 6,000.00
0.0100 org Mandor @ Rp. 50,000.00 500.00
JUMLAH ( BELUM PPN ) 13,226.00

AK 1.0000 m2 Pasang tegel keramik 20/20 dan 30/30


1.0000 m 2
Tegel keramik (std) @ Rp. 89,700.00
4.0800 kg PC @ Rp. 1,495.00
0.0090 m3 Pasir pasang @ Rp. 126,500.00
0.6000 kg Semen putih @ Rp. 1,940.63
0.5000 org Tukang batu @ Rp. 40,000.00 20,000.00
0.0500 org Kep. Tk. Batu @ Rp. 48,400.00 2,420.00
0.2500 org Pekerja @ Rp. 30,000.00 7,500.00
0.0125 org Mandor @ Rp. 50,000.00 625.00
JUMLAH ( BELUM PPN ) 30,545.00

AK 1.0000 m2 Pasang tegel keramik 20/20


1.0000 m 2
Keramik 20/20 @ Rp. 46,000.00
4.0800 kg PC @ Rp. 1,495.00
0.0090 m3 Pasir pasang @ Rp. 126,500.00
0.6000 kg Semen putih @ Rp. 1,940.63
0.5000 org Tukang batu @ Rp. 40,000.00 20,000.00
0.0500 org Kep. Tk. Batu @ Rp. 48,400.00 2,420.00
0.2500 org Pekerja @ Rp. 30,000.00 7,500.00
0.0125 org Mandor @ Rp. 50,000.00 625.00
JUMLAH ( BELUM PPN ) 30,545.00

1.0000 m2 Pasang keramik dinding 20/25


1.0000 m 2
Tegel keramik 20/25 @ Rp. 39,100.00
9.3000 kg PC @ Rp. 1,495.00
0.0180 m3 Pasir pasang @ Rp. 126,500.00
1.5000 kg Semen putih @ Rp. 1,940.63
0.6500 org Tukang batu @ Rp. 40,000.00 26,000.00
0.0650 org Kep. Tk. Batu @ Rp. 48,400.00 3,146.00
0.3200 org Pekerja @ Rp. 30,000.00 9,600.00
0.0160 org Mandor @ Rp. 50,000.00 800.00
JUMLAH ( BELUM PPN ) 39,546.00

SNI 1.0000 m3 Membuat kusen pintu / jendela kayu kamper


6.2 1.2000 m 3
Kayu kamper @ Rp. 9,085,000.00
03-3434-2002 18.0000 org Tukang kayu @ Rp. 41,000.00 738,000.00
No. Macam Pekerjaan Upah
2.0000 org Kepala tukang kayu @ Rp. 48,400.00 96,800.00
6.0000 org Pekerja @ Rp. 30,000.00 180,000.00
0.3000 org Mandor @ Rp. 50,000.00 15,000.00
JUMLAH ( BELUM PPN ) 1,029,800.00
No. Macam Pekerjaan Upah

SNI 1.0000 m2 Mengerjakan daun pintu / jendela panil kayu kamper


6.8 0.0400 m 3
Kayu kamper papan @ Rp. 10,350,000.00
03-3434-2002 2.5000 org Tukang kayu @ Rp. 41,000.00 102,500.00
0.2500 org Kepala tukang kayu @ Rp. 48,400.00 12,100.00
1.0000 org Pekerja @ Rp. 30,000.00 30,000.00
0.0500 org Mandor @ Rp. 50,000.00 2,500.00
JUMLAH ( BELUM PPN ) 147,100.00

SNI 1.0000 m3 Membuat kuda-kuda kayu kamper


6.28 1.1000 m 3
Kayu kamper @ Rp. 9,085,000.00
03-3434-2002 15.0000 kg Besi strip @ Rp. 11,500.00
0.8000 kg Paku biasa 2" - 5" @ Rp. 13,800.00
12.0000 org Tukang kayu @ Rp. 41,000.00 492,000.00
1.2000 org Kepala tukang kayu @ Rp. 48,400.00 58,080.00
4.0000 org Pekerja @ Rp. 30,000.00 120,000.00
0.2000 org Mandor @ Rp. 50,000.00 10,000.00
JUMLAH ( BELUM PPN ) 680,080.00

AK 1.0000 m2 Pasang usuk 5/7 kayu kamper, reng 2/3 reng kayu jati
2.2000 m1 Usuk kayu kamper 5/7 @ Rp. 45,000.00
5.0000 m 1
Reng jati 2/3 @ Rp. 25,000.00
0.1500 kg Paku usuk @ Rp. 11,500.00
0.1000 kg Paku reng @ Rp. 13,800.00
0.1000 org Tukang kayu @ Rp. 41,000.00 4,100.00
0.0100 org Kep. Tk. Kayu @ Rp. 48,400.00 484.00
0.1000 org Pekerja @ Rp. 30,000.00 3,000.00
0.0025 org Mandor @ Rp. 50,000.00 125.00
JUMLAH ( BELUM PPN ) 7,709.00

H.2 1.0000 m2 Pasang genteng press


25.0000 bh Genteng press @ Rp. 805.00
0.1000 org Tukang batu @ Rp. 40,000.00 4,000.00
0.0100 org Kep. Tk. Batu @ Rp. 48,400.00 484.00
0.2000 org Pekerja @ Rp. 30,000.00 6,000.00
0.0100 org Mandor @ Rp. 50,000.00 500.00
JUMLAH ( BELUM PPN ) 10,984.00

H.6 1.0000 m1 Pasang bubungan genteng press


5.0000 bh Bubungan genteng paris @ Rp. 4,900.00
0.0152 m 3
Kapur pasang @ Rp. 244,375.00
0.0152 m3 Pasir pasang @ Rp. 126,500.00
1.5240 kg PC @ Rp. 1,495.00
0.2000 org Tukang batu @ Rp. 40,000.00 8,000.00
0.0200 org Kep. Tk. Batu @ Rp. 48,400.00 968.00
No. Macam Pekerjaan Upah
0.4000 org Pekerja @ Rp. 30,000.00 12,000.00
0.0200 org Mandor @ Rp. 50,000.00 1,000.00
JUMLAH ( BELUM PPN ) 21,968.00
No. Macam Pekerjaan Upah
1.0000 m 1
Mengerjakan papan ruiter kayu kamper 2/20
0.0040 m3 Kayu kamper papan @ Rp. 10,062,500.00
0.0200 kg Paku biasa 2" - 5" @ Rp. 11,500.00
0.0800 org Tukang kayu @ Rp. 41,000.00 3,280.00
0.0080 org Kepala tukang kayu @ Rp. 48,400.00 387.20
0.0280 org Pekerja @ Rp. 30,000.00 840.00
0.0014 org Mandor @ Rp. 50,000.00 70.00
JUMLAH 4,577.20

SNI 1.0000 m1 Pasang lisplank ukuran 2 x (2 x 20) cm, kayu kamper


6.52 0.0086 m 3
Kayu kamper papan @ Rp. 10,062,500.00
03-3434-2002 0.0600 kg Paku biasa 2" - 5" @ Rp. 11,500.00
0.1000 org Tukang kayu @ Rp. 41,000.00 4,100.00
0.0100 org Kepala tukang kayu @ Rp. 48,400.00 484.00
0.1000 org Pekerja @ Rp. 30,000.00 3,000.00
0.0050 org Mandor @ Rp. 50,000.00 250.00
JUMLAH ( BELUM PPN ) 7,834.00

SNI 1.0000 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu kamper tanpa plepet
0.0120 m 3
Kayu kamper balok @ Rp. 9,085,000.00
03-2838-2002 0.0600 kg Paku biasa @ Rp. 11,500.00
1.1000 lbr Asbes 1,00 x 1,00 m @ Rp. 10,350.00
0.3200 org Tukang kayu @ Rp. 41,000.00 13,120.00
0.0320 org Kepala tukang kayu @ Rp. 48,400.00 1,548.80
0.1800 org Pekerja @ Rp. 30,000.00 5,400.00
0.0090 org Mandor @ Rp. 50,000.00 450.00
JUMLAH ( BELUM PPN ) 20,518.80

SNI 1.0000 m2 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis cat penutup
6.8 0.2000 kg Cat meni @ Rp. 21,850.00
0.1500 kg Plamir @ Rp. 21,850.00
0.1700 kg Cat dasar @ Rp. 51,750.00
0.2600 kg Cat penutup @ Rp. 51,750.00
0.0900 org Tukang cat @ Rp. 40,000.00 3,600.00
0.0060 org Kepala tukang cat @ Rp. 47,900.00 287.40
0.0700 org Pekerja @ Rp. 30,000.00 2,100.00
0.0025 org Mandor @ Rp. 50,000.00 125.00
JUMLAH ( BELUM PPN ) 6,112.40

SNI 1.0000 m2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
6.14 0.1000 kg Plamir tembok @ Rp. 9,300.00
0.1000 kg Cat dasar @ Rp. 16,675.00
0.2600 kg Cat penutup 2 x @ Rp. 16,675.00
0.0630 org Tukang cat @ Rp. 40,000.00 2,520.00
0.0063 org Kepala tukang cat @ Rp. 47,900.00 301.77
No. Macam Pekerjaan Upah
0.0200 org Pekerja @ Rp. 30,000.00 600.00
0.0025 org Mandor @ Rp. 50,000.00 125.00
JUMLAH ( BELUM PPN ) 3,546.77

1.0000 kg Pasang rangka atap baja


1.1000 kg Baja @ Rp. 11,000.00
0.0800 kg Meni besi @ Rp. 20,000.00
0.0060 org Tukang besi @ Rp. 45,000.00 270.00
0.0060 org Kepala tukang besi @ Rp. 47,500.00 285.00
0.0600 org Pekerja @ Rp. 35,000.00 2,100.00
0.0003 org Mandor @ Rp. 47,500.00 14.25
JUMLAH ( BELUM PPN ) 2,669.25
Bahan Jumlah

- 18,410.00

6,710.00

598,000.00
57,500.00
141,450.00

796,950.00 1,036,790.00

11,471.25
258.75

11,730.00 12,276.65

21,505.00
51,060.00
4,600.00

77,165.00 106,585.00
Bahan Jumlah

735,000.00

735,000.00 1,330,070.00

- 45,000.00
Bahan Jumlah

1,036,790.00
1,841,497.50
1,065,850.00
45,000.00
3,989,137.50 3,989,137.50

1,036,790.00
1,841,497.50
799,387.50
1,330,070.00
45,000.00
5,052,745.00 5,052,745.00

684,777.50
1,534,581.25
799,387.50
1,330,070.00
45,000.00
4,393,816.25 4,393,816.25

325,910.00
74,750.00
150,075.00

550,735.00 615,445.00

139,150.00
203,320.00
68,816.00
Bahan Jumlah

411,286.00 486,940.00

40,250.00
17,192.50
5,439.50

62,882.00 77,716.00
Bahan Jumlah

7,774.00
2,530.00

10,304.00 23,530.00

89,700.00
6,099.60
1,138.50
1,164.38

98,102.48 128,647.48

46,000.00
6,099.60
1,138.50
1,164.38

54,402.48 84,947.48

39,100.00
13,903.50
2,277.00
2,910.94

58,191.44 97,737.44

10,902,000.00
Bahan Jumlah

10,902,000.00 11,931,800.00
Bahan Jumlah

414,000.00

414,000.00 561,100.00

9,993,500.00
172,500.00
11,040.00

10,177,040.00 10,857,120.00

99,000.00
125,000.00
1,725.00
1,380.00

227,105.00 234,814.00

20,125.00

20,125.00 31,109.00

24,500.00
3,714.50
1,922.80
2,278.38
Bahan Jumlah

32,415.68 54,383.68
Bahan Jumlah

40,250.00
230.00

40,480.00 45,057.20

86,537.50
690.00

87,227.50 95,061.50

109,020.00
690.00
11,385.00

121,095.00 141,613.80

r, 2 lapis cat penutup


4,370.00
3,277.50
8,797.50
13,455.00

29,900.00 36,012.40

apis cat penutup)


930.00
1,667.50
4,335.50
Bahan Jumlah

6,933.00 10,479.77

12,100.00
1,600.00

13,700.00 16,369.25
16,369.00
DAFTAR HARGA DAN UPAH

PEKERJAAN : PEMBANGUNAN GUDANG DAN BALAI PERTEMUAN


LOKASI : TENONGAN GUPIT SUKOHARJO
TH. ANGGARAN :2013

No Nama Tenaga/Bahan Satuan Harga Satuan


1 Pekerja Hari 30,000.00
2 Mandor Hari 50,000.00
3 Tukang batu Hari 40,000.00
4 Kepala tukang batu Hari 48,400.00
5 Tukang besi Hari 41,000.00
6 Kepala tukang besi Hari 49,500.00
7 Tukang kayu Hari 41,000.00
8 Kep. Tk. Kayu Hari 48,400.00
9 Tukang cat Hari 40,000.00
10 Kepala tukang cat Hari 47,900.00

BAHAN
1 PC kg 1,495.00
2 Pasir beton m3 143,750.00
3 Pasir pasang m3 126,500.00
4 Bata merah bh 575.00
5 Batu pecah 2/3 m3 172,500.00
6 Batu belah 15/20 cm m3 126,500.00
7 Besi beton ulir kg 10,925.00
8 Kawat beton kg 17,250.00
9 Usuk meranti m3 1,265,000.00
10 Papan cetakan m3 2,127,500.00
11 Paku kg 11,500.00
12 Perancah/dolken m3 1,500,000.00
13 Keramik 30x30 cm polos m2 89,700.00
14 Keramik 20/20 cm m2 46,000.00
15 Keramik 20/25 cm m2 39,100.00
16 Semen putih kg 1,940.63
17 Kayu kamper 6/12 cm m3 9,085,000.00
18 Kayu kamper papan m3 10,350,000.00
19 Besi strip kg 11,500.00
20 Paku kg 13,800.00
21 Usuk kayu kamper 5/7 m' 45,000.00
22 Reng jati 2/3 m' 25,000.00
23 Paku reng kg 13,800.00
24 Genteng press bh 805.00
25 Bubungan genteng paris bh 4,900.00
No Nama Tenaga/Bahan Satuan Harga Satuan
26 Kapur pasang m3 244,375.00
27 Asbes 1,00 x 1,00 m bh 10,350.00
28 Cat meni kayu kg 21,850.00
29 Plamir kayu kg 21,850.00
30 Cat dasar kg 51,750.00
31 Plamir tembok kg 9,300.00
32 Cat dasar kg 16,675.00
33 Baja kg 11,000.00
24.75
56.75
7.47

Anda mungkin juga menyukai