Anda di halaman 1dari 207

ANALISA HARGA SATUAN PEKERJAAN

Analisa : AHSP A.0.0.1


Item : 1 Buah Papan Nama Pekerjaan Multiplek 9mm, Frame Allumunium , Kaso 5/7, Printing Banner
Satuan : 120 CM x 240 CM

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.750 Rp. 174,748.00 Rp. 131,061.00
Tukang Kayu L.02 OH 0.750 Rp. 183,834.00 Rp. 137,875.50
Kepala Tukang L.03 OH 0.100 Rp. 199,782.00 Rp. 19,978.20
Mandor L.04 OH 0.075 Rp. 211,379.00 Rp. 15,853.43
Jumlah Tenaga Kerja (A) Rp. 304,768.13
B BAHAN
Multiplek 9mm lbr 1.000 Rp. 76,500.00 Rp. 76,500.00
Kaso 5/7 Borneo m3 0.021 Rp. 1,500,000.00 Rp. 31,500.00
Frame Allumunium kg 0.100 Rp. 200,000.00 Rp. 20,000.00
Printing banner m2 6.000 Rp. 18,000.00 Rp. 108,000.00
Paku Biasa 5 cm - 10 cm kg 0.750 Rp. 13,560.00 Rp. 10,170.00
Cat Kayu kg 0.450 Rp. 68,000.00 Rp. 30,600.00
Beton k-175 m3 0.450 Rp. 1,203,308.42 Rp. 541,488.79
Jumlah Harga Bahan (B) Rp. 276,770.00
C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 852,282.52
E Overhead & Profit 10% x D Rp. 85,228.25
F Harga Satuan Pekerjaan ( D + E ) Rp. 937,510.77
G Dibulatkan Rp. 937,510.00

Analisa : AHSP A.2.2.1.2


Item : 1 Set foto dokumentasi menggunakan Kamera Digital tanpa film
Satuan : 120 CM x 240 CM

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Tukang Foto OH 1.000 Rp. 211,379.00 Rp. 211,379.00
Jumlah Tenaga Kerja (A) Rp. 211,379.00
B BAHAN
CD-R bh 3.000 Rp. 1,950.00 Rp. 5,850.00
Cetak Foto lbr 80.000 Rp. 1,200.00 Rp. 96,000.00
Album Foto ls 1.000 Rp. 13,000.00 Rp. 13,000.00
Jumlah Harga Bahan (B) Rp. 114,850.00
C PERALATAN
Kamera DSLR sewa/hari 1.000 Rp. 250,000.00 Rp. 250,000.00

Jumlah Harga Alat (C) Rp. 250,000.00


D Jumlah ( A + B + C ) Rp. 576,229.00
E Overhead & Profit 10% x D Rp. 57,622.90
F Harga Satuan Pekerjaan ( D + E ) Rp. 633,851.90
G Dibulatkan Rp. 633,851.00

Analisa : AHSP A.2.2.1.2


Item : Pembuatan 1m2 gudang semen dan peralatan
Satuan : m2

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.000 Rp. 174,748.00 Rp. 174,748.00
Tukang Kayu L.02 OH 2.000 Rp. 183,834.00 Rp. 367,668.00
Kepala Tukang L.03 OH 0.200 Rp. 199,782.00 Rp. 39,956.40
Mandor L.04 OH 0.050 Rp. 211,379.00 Rp. 10,568.95
Jumlah Tenaga Kerja (A) Rp. 592,941.35
B BAHAN
Kayu Dolken Ø 8-10/400 cm Batang 1.700 Rp. 45,000.00 Rp. 76,500.00
Kaso 5/7 m3 0.210 Rp. 1,500,000.00 Rp. 315,000.00
Paku segala ukuran kg 0.300 Rp. 13,000.00 Rp. 3,900.00
Semen Portland kg 10.500 Rp. 1,420.00 Rp. 14,910.00
Pasir Beton m3 0.030 Rp. 285,000.00 Rp. 8,550.00
Koral Beton m3 0.050 Rp. 178,000.00 Rp. 8,900.00
Seng gelombang lbr 1.500 Rp. 53,500.00 Rp. 80,250.00
Seng Pelat lbr 0.250 Rp. 300,300.00 Rp. 75,075.00
Jumlah Harga Bahan (B) Rp. 583,085.00
C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 1,176,026.35
E Overhead & Profit 10% x D Rp. 117,602.64
F Harga Satuan Pekerjaan ( D + E ) Rp. 1,293,628.99
G Dibulatkan Rp. 1,293,628.00

Analisa : AHSP A.0.0.2


Item : Pagar Sementara Dari Seng Gelombang Tinggi 2 Meter (K3)
Satuan : m

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.200 Rp. 174,748.00 Rp. 34,949.60
Tukang Kayu L.02 OH 0.400 Rp. 183,834.00 Rp. 73,533.60
Kepala Tukang L.03 OH 0.020 Rp. 199,782.00 Rp. 3,995.64
Mandor L.04 OH 0.020 Rp. 211,379.00 Rp. 4,227.58
Jumlah Tenaga Kerja (A) Rp. 116,706.42
B BAHAN
Kayu Dolken Ø 8-10/400 cm Batang 1.250 Rp. 15,000.00 Rp. 18,750.00
Semen @ 40 Kg Kg 2.500 Rp. 1,399.98 Rp. 3,499.94
Seng BJLS 0.20 Lbr 1.200 Rp. 53,500.00 Rp. 64,200.00
Pasir Beton Kg 0.005 Rp. 285,000.00 Rp. 1,425.00
Koral Beton M3 0.009 Rp. 250,000.00 Rp. 2,250.00
Kayu 5/7 M3 0.072 Rp. 2,500,000.00 Rp. 180,000.00
Paku Biasa 5 cm - 10 cm Kg 0.060 Rp. 13,560.00 Rp. 813.60
Cat Menie Kg 0.450 Rp. 28,000.00
Jumlah Harga Bahan (B) Rp. 270,938.54
C PERALATAN
Jumlah Harga Alat (C) Rp -
D Jumlah ( A + B + C ) Rp. 387,644.96
E Overhead & Profit 10% x D Rp. 38,764.50
F Harga Satuan Pekerjaan ( D + E ) Rp. 426,409.45
G Dibulatkan Rp. 426,409.00

Analisa : AHSP A.0.0.3


Item : Pengukuran dan Pemasangan Bouwplank
Satuan : m1

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.100 Rp. 174,748.00 Rp. 17,474.80
Tukang Kayu L.02 OH 0.100 Rp. 183,834.00 Rp. 18,383.40
Kepala Tukang L.03 OH 0.010 Rp. 199,782.00 Rp. 1,997.82
Mandor L.04 OH 0.005 Rp. 211,379.00 Rp. 1,056.90
Jumlah Tenaga Kerja (A) Rp. 38,912.91
B BAHAN
Kayu 5/7 M3 0.012 Rp. 1,500,000.00 Rp. 18,000.00
Paku Kayu Kg 0.020 Rp. 13,560.00 Rp. 271.20
Papan Kayu Kelas III m3 0.007 Rp. 2,952,900.00 Rp. 20,670.30

Jumlah Harga Bahan (B) Rp. 38,941.50


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 77,854.42
E Overhead & Profit 10% x D Rp. 7,785.44
F Harga Satuan Pekerjaan ( D + E ) Rp. 85,639.86
G Dibulatkan Rp. 85,639.00

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.100 Rp. 174,748.00 Rp. 17,474.80
Tukang Kayu L.02 OH - Rp. 183,834.00 Rp -
Kepala Tukang L.03 OH - Rp. 199,782.00 Rp -
Mandor L.04 OH 0.050 Rp. 211,379.00 Rp. 10,568.95
Jumlah Tenaga Kerja (A) Rp. 28,043.75
B BAHAN

Jumlah Harga Bahan (B) Rp -


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 28,043.75
E Overhead & Profit 10% x D Rp. 2,804.38
F Harga Satuan Pekerjaan ( D + E ) Rp. 30,848.13
G Dibulatkan Rp. 30,848.00

Analisa : AHSP A.0.0.4


Item : Pembersihan Dan Pengupasan Lahan
Satuan : m2
Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.090 Rp. 174,748.00 Rp. 15,727.32
Tukang Kayu L.02 OH - Rp. 183,834.00 Rp -
Kepala Tukang L.03 OH - Rp. 199,782.00 Rp -
Mandor L.04 OH 0.050 Rp. 211,379.00 Rp. 10,568.95
Jumlah Tenaga Kerja (A) Rp. 26,296.27
B BAHAN

Jumlah Harga Bahan (B) Rp -


C PERALATAN
Sewa Dump Truck 3-5 m3 Unit/jam 0.020 Rp. 350,000.00 Rp. 7,000.00

Jumlah Harga Alat (C) Rp. 7,000.00


D Jumlah ( A + B + C ) Rp. 33,296.27
E Overhead & Profit 10% x D Rp. 3,329.63
F Harga Satuan Pekerjaan ( D + E ) Rp. 36,625.90
G Dibulatkan Rp. 36,625.00

Analisa : AHSP A.0.0.4


Item : Pekerjaan Pemindahan Tanah Mekanis Dengan Alat Berat (Cut and Fill)
Satuan : m3

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pembantu Operator L.09 OH 0.006 Rp. 174,748.00 Rp. 1,048.49
Operator L.08 OH 0.010 Rp. 211,379.00 Rp. 2,113.79
Jumlah Tenaga Kerja (A) Rp. 3,162.28
B BAHAN

Jumlah Harga Bahan (B) Rp -


C PERALATAN
Sewa Excavator Unit/jam 0.090 Rp. 250,000.00 Rp. 22,500.00
Sewa Bulldozer unit/jam 0.060 Rp. 250,000.00 Rp. 15,000.00

Jumlah Harga Alat (C) Rp. 37,500.00


D Jumlah ( A + B + C ) Rp. 40,662.28
E Overhead & Profit 10% x D Rp. 4,066.23
F Harga Satuan Pekerjaan ( D + E ) Rp. 44,728.51
G Dibulatkan Rp. 44,728.00

Analisa : AHSP A.2.2.1.10


Item : Pembuatan Steger/Perancah Dari Bambu (K3)
Satuan : m2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 1.000 Rp. 174,748.00 Rp. 174,748.00
Tukang Kayu L.02 OH 2.000 Rp. 183,834.00 Rp. 367,668.00
Kepala Tukang L.03 OH 0.200 Rp. 199,782.00 Rp. 39,956.40
Mandor L.04 OH 0.050 Rp. 211,379.00 Rp. 10,568.95
Jumlah Tenaga Kerja (A) Rp. 592,941.35
B BAHAN
Bambu Batang 1.250 Rp. 60,000.00 Rp. 75,000.00
Ijuk Kg 0.186 Rp. 12,300.00 Rp. 2,287.80

Jumlah Harga Bahan (B) Rp. 77,287.80


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 670,229.15
E Overhead & Profit 10% x D Rp. 67,022.92
F Harga Satuan Pekerjaan ( D + E ) Rp. 737,252.07
G Dibulatkan Rp. 737,252.00

Analisa : AHSP A.2.2.1.13


Item : Pembongkaran Beton Bertulang Dengan Jack Hammer Termasuk Pembuangan
Satuan : m3

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.200 Rp. 174,748.00 Rp. 34,949.60
Tukang Kayu L.02 OH - Rp. 183,834.00 Rp -
Kepala Tukang L.03 OH - Rp. 199,782.00 Rp -
Mandor L.04 OH 0.020 Rp. 211,379.00 Rp. 4,227.58
Jumlah Tenaga Kerja (A) Rp. 39,177.18
B BAHAN

Jumlah Harga Bahan (B) Rp -


C PERALATAN
Sewa Dump Truck unit/jam 0.696 Rp. 150,000.00 Rp. 104,367.00
Sewa Compresor unit/jam 1.205 Rp. 56,250.00 Rp. 67,771.13
Sewa Jack Hammer unit/jam 0.050 Rp. 250,000.00 Rp. 12,500.00
Jumlah Harga Alat (C) Rp. 184,638.13
D Jumlah ( A + B + C ) Rp. 223,815.31
E Overhead & Profit 10% x D Rp. 22,381.53
F Harga Satuan Pekerjaan ( D + E ) Rp. 246,196.84
G Dibulatkan Rp. 246,196.00

Analisa : AHSP A.2.2.1.14


Item : Pembongkaran Dinding Tembok Bata
Satuan : m3

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.667 Rp. 174,748.00 Rp. 116,556.92
Tukang Kayu L.02 OH - Rp. 183,834.00 Rp -
Kepala Tukang L.03 OH - Rp. 199,782.00 Rp -
Mandor L.04 OH 0.033 Rp. 211,379.00 Rp. 6,975.51
Jumlah Tenaga Kerja (A) Rp. 123,532.42
B BAHAN

Jumlah Harga Bahan (B) Rp -


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 123,532.42
E Overhead & Profit 10% x D Rp. 12,353.24
F Harga Satuan Pekerjaan ( D + E ) Rp. 135,885.67
G Dibulatkan Rp. 135,885.00
Analisa : AHSP A.2.2.1.14
Item : Pembongkaran Jembatan Kayu ( Bongkaran dipakai kembali)
Satuan : m3

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 4.000 Rp. 174,748.00 Rp. 698,992.00
Tukang Kayu L.02 OH 6.000 Rp. 183,834.00 Rp. 1,103,004.00
Kepala Tukang L.03 OH 0.600 Rp. 199,782.00 Rp. 119,869.20
Mandor L.04 OH 0.200 Rp. 211,379.00 Rp. 42,275.80
Jumlah Tenaga Kerja (A) Rp. 1,964,141.00
B BAHAN

Jumlah Harga Bahan (B) Rp -


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 1,964,141.00
E Overhead & Profit 10% x D Rp. 196,414.10
F Harga Satuan Pekerjaan ( D + E ) Rp. 2,160,555.10
G Dibulatkan Rp. 2,160,555.00

Analisa : AHSP A.2.2.1.14


Item : Pembongkaran Jembatan Kayu ( Bongkaran tidak dipakai kembali)
Satuan : m3

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 6.000 Rp. 174,748.00 Rp. 1,048,488.00
Tukang Kayu L.02 OH 2.000 Rp. 183,834.00 Rp. 367,668.00
Kepala Tukang L.03 OH Rp. 199,782.00 Rp -
Mandor L.04 OH 0.300 Rp. 211,379.00 Rp. 63,413.70
Jumlah Tenaga Kerja (A) Rp. 1,479,569.70
B BAHAN

Jumlah Harga Bahan (B) Rp -


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 1,479,569.70
E Overhead & Profit 10% x D Rp. 147,956.97
F Harga Satuan Pekerjaan ( D + E ) Rp. 1,627,526.67
G Dibulatkan Rp. 1,627,526.00

Analisa : AHSP A.2.2.1.14


Item : Pembongkaran Plesteran dinding
Satuan : m2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.125 Rp. 174,748.00 Rp. 21,843.50
Mandor L.04 OH 0.013 Rp. 211,379.00 Rp. 2,642.24
Jumlah Tenaga Kerja (A) Rp. 24,485.74
B BAHAN

Jumlah Harga Bahan (B) Rp -


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 24,485.74
E Overhead & Profit 10% x D Rp. 2,448.57
F Harga Satuan Pekerjaan ( D + E ) Rp. 26,934.31
G Dibulatkan Rp. 26,934.00
Analisa : AHSP A.2.2.1.14
Item : Pembongkaran Genteng / Sirap ( Bongkaran dipakai kembali)
Satuan : m2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.500 Rp. 174,748.00 Rp. 87,374.00
Mandor L.04 OH 0.050 Rp. 211,379.00 Rp. 10,568.95
Jumlah Tenaga Kerja (A) Rp. 97,942.95
B BAHAN

Jumlah Harga Bahan (B) Rp -


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 97,942.95
E Overhead & Profit 10% x D Rp. 9,794.30
F Harga Satuan Pekerjaan ( D + E ) Rp. 107,737.25
G Dibulatkan Rp. 107,737.00

Analisa : AHSP A.2.2.1.14


Item : Pembongkaran Genteng / Sirap ( Bongkaran tidak dipakai kembali)
Satuan : m2

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.100 Rp. 174,748.00 Rp. 17,474.80
Mandor L.04 OH 0.010 Rp. 211,379.00 Rp. 2,113.79
Jumlah Tenaga Kerja (A) Rp. 19,588.59
B BAHAN

Jumlah Harga Bahan (B) Rp -


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 19,588.59
E Overhead & Profit 10% x D Rp. 1,958.86
F Harga Satuan Pekerjaan ( D + E ) Rp. 21,547.45
G Dibulatkan Rp. 21,547.00

Analisa : AHSP A.2.2.1.14


Item : Pembongkaran rangka atap/ reng/ kaso (bongkaran dipakai kembali)
Satuan : m2

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.200 Rp. 174,748.00 Rp. 34,949.60
Tukang Kayu L.02 OH 0.100 Rp. 183,834.00 Rp. 18,383.40
Kepala Tukang L.03 OH 0.010 Rp. 199,782.00 Rp. 1,997.82
Mandor L.04 OH 0.020 Rp. 211,379.00 Rp. 4,227.58
Jumlah Tenaga Kerja (A) Rp. 59,558.40
B BAHAN

Jumlah Harga Bahan (B) Rp -


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 59,558.40
E Overhead & Profit 10% x D Rp. 5,955.84
F Harga Satuan Pekerjaan ( D + E ) Rp. 65,514.24
G Dibulatkan Rp. 65,514.00

Analisa : AHSP A.2.2.1.14


Item : Pembongkaran rangka atap/ reng/ kaso (bongkaran tidak dipakai kembali)
Satuan : m2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.150 Rp. 174,748.00 Rp. 26,212.20
Tukang Kayu L.02 OH 0.075 Rp. 183,834.00 Rp. 13,787.55
Kepala Tukang L.03 OH 0.008 Rp. 199,782.00 Rp. 1,498.37
Mandor L.04 OH 0.015 Rp. 211,379.00 Rp. 3,170.69
Jumlah Tenaga Kerja (A) Rp. 44,668.80
B BAHAN

Jumlah Harga Bahan (B) Rp -


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 44,668.80
E Overhead & Profit 10% x D Rp. 4,466.88
F Harga Satuan Pekerjaan ( D + E ) Rp. 49,135.68
G Dibulatkan Rp. 49,135.00

Analisa : AHSP A.2.2.1.14


Item : Pembongkaran kuda-kuda/ gording / Balok (bongkaran dipakai kembali)
Satuan : m2

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 4.000 Rp. 174,748.00 Rp. 698,992.00
Tukang Kayu L.02 OH 6.000 Rp. 183,834.00 Rp. 1,103,004.00
Kepala Tukang L.03 OH 0.600 Rp. 199,782.00 Rp. 119,869.20
Mandor L.04 OH 0.400 Rp. 211,379.00 Rp. 84,551.60
Jumlah Tenaga Kerja (A) Rp. 2,006,416.80
B BAHAN

Jumlah Harga Bahan (B) Rp -


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 2,006,416.80
E Overhead & Profit 10% x D Rp. 200,641.68
F Harga Satuan Pekerjaan ( D + E ) Rp. 2,207,058.48
G Dibulatkan Rp. 2,207,058.00

Analisa : AHSP A.0.0.5


Item : Menggali Tanah Biasa Sedalam 1 m
Satuan : m3

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.750 Rp. 174,748.00 Rp. 131,061.00
Tukang L.02 OH - Rp. 183,834.00 Rp -
Kepala Tukang L.03 OH - Rp. 199,782.00 Rp -
Mandor L.04 OH 0.025 Rp. 211,379.00 Rp. 5,284.48
Jumlah Tenaga Kerja (A) Rp. 136,345.48
B BAHAN

Jumlah Harga Bahan (B) Rp -


C PERALATAN
Jumlah Harga Alat (C) Rp -
D Jumlah ( A + B + C ) Rp. 136,345.48
E Overhead & Profit 10% x D Rp. 13,634.55
F Harga Satuan Pekerjaan ( D + E ) Rp. 149,980.02
G Dibulatkan Rp. 149,980.00

Analisa : AHSP A.2.3.1.2


Item : Menggali Tanah Biasa Sedalam 2 m
Satuan : m3

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.900 Rp. 174,748.00 Rp. 157,273.20
Tukang L.02 OH - Rp. 183,834.00 Rp -
Kepala Tukang L.03 OH - Rp. 199,782.00 Rp -
Mandor L.04 OH 0.045 Rp. 211,379.00 Rp. 9,512.06
Jumlah Tenaga Kerja (A) Rp. 166,785.26
B BAHAN

Jumlah Harga Bahan (B) Rp -


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 166,785.26
E Overhead & Profit 10% x D Rp. 16,678.53
F Harga Satuan Pekerjaan ( D + E ) Rp. 183,463.78
G Dibulatkan Rp. 183,463.00

Analisa : AHSP A.2.3.1.3


Item : Menggali Tanah Biasa Sedalam 3 m
Satuan : m3

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 1.050 Rp. 174,748.00 Rp. 183,485.40
Tukang L.02 OH - Rp. 183,834.00 Rp -
Kepala Tukang L.03 OH - Rp. 199,782.00 Rp -
Mandor L.04 OH 0.067 Rp. 211,379.00 Rp. 14,162.39
Jumlah Tenaga Kerja (A) Rp. 197,647.79
B BAHAN

Jumlah Harga Bahan (B) Rp -


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 197,647.79
E Overhead & Profit 10% x D Rp. 19,764.78
F Harga Satuan Pekerjaan ( D + E ) Rp. 217,412.57
G Dibulatkan Rp. 217,412.57

Analisa : AHSP A.2.3.1.7


Item : Pengerjaan Stripping Tanah Tebing Setinggi 1 m
Satuan : m2
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.050 Rp. 174,748.00 Rp. 8,737.40
Tukang L.02 OH - Rp. 183,834.00 Rp -
Kepala Tukang L.03 OH - Rp. 199,782.00 Rp -
Mandor L.04 OH 0.005 Rp. 211,379.00 Rp. 1,056.90
Jumlah Tenaga Kerja (A) Rp. 9,794.30
B BAHAN

Jumlah Harga Bahan (B) Rp -


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 9,794.30
E Overhead & Profit 10% x D Rp. 979.43
F Harga Satuan Pekerjaan ( D + E ) Rp. 10,773.72
G Dibulatkan Rp. 10,773.00

Analisa : AHSP A.2.3.1.8


Item : (K3) Pembuangan Tanah Sejauh 30 meter
Satuan : m3

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.330 Rp. 174,748.00 Rp. 57,666.84
Tukang L.02 OH - Rp. 183,834.00 Rp -
Kepala Tukang L.03 OH - Rp. 199,782.00 Rp -
Mandor L.04 OH 0.010 Rp. 211,379.00 Rp. 2,113.79
Jumlah Tenaga Kerja (A) Rp. 59,780.63
B BAHAN

Jumlah Harga Bahan (B) Rp -


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 59,780.63
E Overhead & Profit 10% x D Rp. 5,978.06
F Harga Satuan Pekerjaan ( D + E ) Rp. 65,758.69
G Dibulatkan Rp. 65,758.00

Analisa : AHSP A.2.3.1.8


Item : Angkut material / Sisa Galian sejauh 20 KM (dengan Dump Truck)
Satuan : m3

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA

Jumlah Tenaga Kerja (A) Rp -


B BAHAN
Jumlah Harga Bahan (B) Rp -
C PERALATAN
Sewa Dump Truck m3 0.740 Rp. 250,000.00 Rp. 185,000.00

Jumlah Harga Alat (C) Rp. 185,000.00


D Jumlah ( A + B + C ) Rp. 185,000.00
E Overhead & Profit 10% x D Rp. 18,500.00
F Harga Satuan Pekerjaan ( D + E ) Rp. 203,500.00
G Dibulatkan Rp. 203,500.00

Analisa : AHSP A.2.3.1.9


Item : Pengurugan Kembali Galian Tanah
Satuan : m3

Pengurugan Kembali 1 m3 Galian Dihitung dari 1/3 kali Koefisien Pekerjaan Galian
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.500 Rp. 174,748.00 Rp. 87,374.00
Tukang L.02 OH - Rp. 183,834.00 Rp -
Kepala Tukang L.03 OH - Rp. 199,782.00 Rp -
Mandor L.04 OH 0.050 Rp. 211,379.00 Rp. 10,568.95
Jumlah Tenaga Kerja (A) Rp. 97,942.95
B BAHAN

Jumlah Harga Bahan (B) Rp -


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 97,942.95
E Overhead & Profit 10% x D Rp. 9,794.30
F Harga Satuan Pekerjaan ( D + E ) Rp. 107,737.25
G Dibulatkan Rp. 107,737.00
Analisa : AHSP A.2.3.1.10
Item : (K3) Pemadatan Tanah ( Per 20 cm )
Satuan : m3

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.500 Rp. 174,748.00 Rp. 87,374.00
Tukang L.02 OH - Rp. 183,834.00 Rp -
Kepala Tukang L.03 OH - Rp. 199,782.00 Rp -
Mandor L.04 OH 0.050 Rp. 211,379.00 Rp. 10,568.95
Jumlah Tenaga Kerja (A) Rp. 97,942.95
B BAHAN

Jumlah Harga Bahan (B) Rp -


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 97,942.95
E Overhead & Profit 10% x D Rp. 9,794.30
F Harga Satuan Pekerjaan ( D + E ) Rp. 107,737.25
G Dibulatkan Rp. 107,737.00

Analisa : AHSP A.2.3.1.10


Item : Pemadatan Tanah dengan stamper
Satuan : m3

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.045 Rp. 174,748.00 Rp. 7,793.76
Tukang L.02 OH - Rp. 183,834.00 Rp -
Kepala Tukang L.03 OH - Rp. 199,782.00 Rp -
Mandor L.04 OH 0.005 Rp. 211,379.00 Rp. 951.21
Jumlah Tenaga Kerja (A) Rp. 8,744.97
B BAHAN

Jumlah Harga Bahan (B) Rp -


C PERALATAN
Sewa Stamper hari 0.022 Rp. 550,000.00 Rp. 12,265.00

Jumlah Harga Alat (C) Rp. 12,265.00


D Jumlah ( A + B + C ) Rp. 21,009.97
E Overhead & Profit 10% x D Rp. 2,101.00
F Harga Satuan Pekerjaan ( D + E ) Rp. 23,110.96
G Dibulatkan Rp. 23,110.00

Analisa : AHSP A.0.0.6


Item : Urugan Dengan Pasir Urug
Satuan : m3

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.300 Rp. 174,748.00 Rp. 52,424.40
Tukang L.02 OH - Rp. 183,834.00 Rp -
Kepala Tukang L.03 OH - Rp. 199,782.00 Rp -
Mandor L.04 OH 0.010 Rp. 211,379.00 Rp. 2,113.79
Jumlah Tenaga Kerja (A) Rp. 54,538.19
B BAHAN
Pasir Urug M3 1.200 Rp. 300,000.00 Rp. 360,000.00

Jumlah Harga Bahan (B) Rp. 360,000.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 414,538.19
E Overhead & Profit 10% x D Rp. 41,453.82
F Harga Satuan Pekerjaan ( D + E ) Rp. 455,992.01
G Dibulatkan Rp. 455,992.00
Analisa : AHSP A.2.3.1.11.a
Item : Pengurukan Dengan Tanah Urug
Satuan : m3

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.300 Rp. 174,748.00 Rp. 52,424.40
Tukang L.02 OH - Rp. 183,834.00 Rp -
Kepala Tukang L.03 OH - Rp. 199,782.00 Rp -
Mandor L.04 OH 0.010 Rp. 211,379.00 Rp. 2,113.79
Jumlah Tenaga Kerja (A) Rp. 54,538.19
B BAHAN
Tanah Timbun M3 1.200 Rp. 114,285.71 Rp. 137,142.86

Jumlah Harga Bahan (B) Rp. 137,142.86


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 191,681.05
E Overhead & Profit 10% x D Rp. 19,168.10
F Harga Satuan Pekerjaan ( D + E ) Rp. 210,849.15
G Dibulatkan Rp. 210,849.00

Analisa : AHSP A.2.3.1.13


Item : Pemasangan Lapisan Ijuk Tebal 10 cm Untuk Bidang Resapan
Satuan : m2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.150 Rp. 174,748.00 Rp. 26,212.20
Tukang L.02 OH - Rp. 183,834.00 Rp -
Kepala Tukang L.03 OH - Rp. 199,782.00 Rp -
Mandor L.04 OH 0.015 Rp. 211,379.00 Rp. 3,170.69
Jumlah Tenaga Kerja (A) Rp. 29,382.89
B BAHAN
Ijuk m3 6.000 Rp. 400,000.00 Rp. 2,400,000.00

Jumlah Harga Bahan (B) Rp. 2,400,000.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 2,429,382.89
E Overhead & Profit 10% x D Rp. 242,938.29
F Harga Satuan Pekerjaan ( D + E ) Rp. 2,672,321.17
G Dibulatkan Rp. 2,672,321.00

Analisa : AHSP A.2.3.1.14


Item : Pengurukan Sirtu Padat
Satuan : m3
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.207 Rp. 174,748.00 Rp. 36,085.46
Tukang L.02 OH - Rp. 183,834.00 Rp -
Kepala Tukang L.03 OH - Rp. 199,782.00 Rp -
Mandor L.04 OH 0.021 Rp. 211,379.00 Rp. 4,375.55
Jumlah Tenaga Kerja (A) Rp. 40,461.01
B BAHAN
Pasir Batu (Sirtu) M3 1.200 Rp. 250,000.00 Rp. 300,000.00

Jumlah Harga Bahan (B) Rp. 300,000.00


C PERALATAN
Sewa Stamper unit/jam 0.241 Rp. 68,750.00 Rp. 16,568.75

Jumlah Harga Alat (C) Rp. 16,568.75


D Jumlah ( A + B + C ) Rp. 357,029.76
E Overhead & Profit 10% x D Rp. 35,702.98
F Harga Satuan Pekerjaan ( D + E ) Rp. 392,732.73
G Dibulatkan Rp. 392,732.00

AHSP A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI

Analisa : AHSP A.3.2.1.2


Item : Pemasangan Pondasi Batu Belah Campuran 1 SP : 4 PP
Satuan : m3

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 1.500 Rp. 174,748.00 Rp. 262,122.00
Tukang L.02 OH 0.750 Rp. 183,834.00 Rp. 137,875.50
Kepala Tukang L.03 OH 0.075 Rp. 199,782.00 Rp. 14,983.65
Mandor L.04 OH 0.075 Rp. 211,379.00 Rp. 15,853.43
Jumlah Tenaga Kerja (A) Rp. 430,834.58
B BAHAN
Batu Kali / Batu Belah (Sungai / Gunung) M3 1.200 Rp. 280,000.00 Rp. 336,000.00
Semen @ 40 Kg Kg 163.000 Rp. 1,120.00 Rp. 182,560.00
Pasir Pasang (1400 kg/m3) M3 0.520 Rp. 217,000.00 Rp. 112,840.00

Jumlah Harga Bahan (B) Rp. 631,400.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 1,062,234.58
E Overhead & Profit 10% x D Rp. 106,223.46
F Harga Satuan Pekerjaan ( D + E ) Rp. 1,168,458.03
G Dibulatkan Rp. 1,168,458.03

Analisa : AHSP A.3.2.1.2


Item : Pemasangan Pondasi Batu Belah Campuran 1 SP : 3 PP
Satuan : m3

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.500 Rp. 174,748.00 Rp. 262,122.00
Tukang L.02 OH 0.750 Rp. 183,834.00 Rp. 137,875.50
Kepala Tukang L.03 OH 0.075 Rp. 199,782.00 Rp. 14,983.65
Mandor L.04 OH 0.075 Rp. 211,379.00 Rp. 15,853.43
Jumlah Tenaga Kerja (A) Rp. 430,834.58
B BAHAN
Batu Kali / Batu Belah (Sungai / Gunung) m3 1.200 Rp. 280,000.00 Rp. 336,000.00
Semen @ 40 Kg zak 5.050 Rp. 46,750.00 Rp. 236,087.50
Pasir Pasang (1400 kg/m3) m3 0.485 Rp. 221,285.71 Rp. 107,323.57

Jumlah Harga Bahan (B) Rp. 679,411.07


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 1,110,245.65
E Overhead & Profit 10% x D Rp. 111,024.56
F Harga Satuan Pekerjaan ( D + E ) Rp. 1,221,270.21
G Dibulatkan Rp. 1,221,270.21
Analisa : AHSP A.3.2.1.9
Item : Pemasangan Batu Kosong ( Aanstamping )
Satuan : m3

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.780 Rp. 174,748.00 Rp. 136,303.44
Tukang Batu L.02 OH 0.390 Rp. 183,834.00 Rp. 71,695.26
Kepala Tukang L.03 OH 0.039 Rp. 199,782.00 Rp. 7,791.50
Mandor L.04 OH 0.039 Rp. 211,379.00 Rp. 8,243.78
Jumlah Tenaga Kerja (A) Rp. 224,033.98
B BAHAN
Batu Kali / Batu Belah (Sungai / Gunung) M3 1.200 Rp. 185,000.00 Rp. 222,000.00
Pasir Urug M3 0.432 Rp. 124,000.00 Rp. 53,568.00

Jumlah Harga Bahan (B) Rp. 275,568.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 499,601.98
E Overhead & Profit 10% x D Rp. 49,960.20
F Harga Satuan Pekerjaan ( D + E ) Rp. 549,562.18
G Dibulatkan Rp. 549,562.18

Analisa : AHSP A.3.2.1.10


Item : Pemasangan Pondasi Siklop, 60% Beton Campuran 1 SP : 2 PB : 3 Kr dan 40% Batu Belah
Satuan : m3

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 3.400 Rp. 174,748.00 Rp. 594,143.20
Tukang Batu L.02 OH 0.850 Rp. 183,834.00 Rp. 156,258.90
Kepala Tukang L.03 OH 0.085 Rp. 199,782.00 Rp. 16,981.47
Mandor L.04 OH 0.170 Rp. 211,379.00 Rp. 35,934.43
Jumlah Tenaga Kerja (A) Rp. 803,318.00
B BAHAN
Batu Kali / Batu Belah (Sungai / Gunung) M3 0.480 Rp. 185,000.00 Rp. 88,800.00
Semen @ 40 Kg Kg 194.000 Rp. 1,450.00 Rp. 281,300.00
Pasir Beton (1400 kg/m3) M3 0.312 Rp. 217,000.00 Rp. 67,704.00
Kerikil (1350 kg/m3) M3 0.468 Rp. 217,000.00 Rp. 101,556.00
Besi Beton Polos Kg 126.000 Rp. 12,000.00 Rp. 1,512,000.00
Kawat Beton Kg 1.800 Rp. 22,000.00 Rp. 39,600.00

Jumlah Harga Bahan (B) Rp. 2,090,960.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 2,894,278.00
E Overhead & Profit 10% x D Rp. 289,427.80
F Harga Satuan Pekerjaan ( D + E ) Rp. 3,183,705.80
G Dibulatkan Rp. 3,183,705.00
Analisa : AHSP A.3.2.1.11
Item : Pemasangan Pondasi Sumuran, Diameter 100 cm
Satuan : m3

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 2.400 Rp. 174,748.00 Rp. 419,395.20
Tukang Batu L.02 OH 0.800 Rp. 183,834.00 Rp. 147,067.20
Kepala Tukang L.03 OH 0.080 Rp. 199,782.00 Rp. 15,982.56
Mandor L.04 OH 0.119 Rp. 211,379.00 Rp. 25,114.34
Jumlah Tenaga Kerja (A) Rp. 607,559.30
B BAHAN
Batu Kali / Batu Belah (Sungai / Gunung) M3 0.450 Rp. 185,000.00 Rp. 83,250.00
Semen @ 40 Kg Kg 194.000 Rp. 1,450.00 Rp. 281,300.00
Pasir Beton (1400 kg/m3) M3 0.312 Rp. 217,000.00 Rp. 67,704.00
Kerikil (1350 kg/m3) M3 0.468 Rp. 217,000.00 Rp. 101,556.00

Jumlah Harga Bahan (B) Rp. 533,810.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 1,141,369.30
E Overhead & Profit 10% x D Rp. 114,136.93
F Harga Satuan Pekerjaan ( D + E ) Rp. 1,255,506.23
G Dibulatkan Rp. 1,255,506.00

AHSP A.4.1.1. HARGA SATUAN PEKERJAAN BETON

Analisa : AHSP A.4.1.1.1


Item : Membuat Beton Mutu f'c = 7.4 MPa (K-100), Slump (12 ± 2 ) cm, w/c = 0.87
Satuan : m3

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 1.650 Rp. 174,748.00 Rp. 288,334.20
Tukang L.02 OH 0.275 Rp. 183,834.00 Rp. 50,554.35
Kepala Tukang L.03 OH 0.028 Rp. 199,782.00 Rp. 5,593.90
Mandor L.04 OH 0.083 Rp. 211,379.00 Rp. 17,544.46
Jumlah Tenaga Kerja (A) Rp. 362,026.90
B BAHAN
Semen @ 40 Kg Kg 247.000 Rp. 1,399.98 Rp. 345,793.82
Pasir Beton (1400 kg/m3) Kg 869.000 Rp. 203.57 Rp. 176,903.57
Kerikil (1350 kg/m3) Kg 999.000 Rp. 185.19 Rp. 185,000.00
Air Liter 215.000 Rp. 100.00 Rp. 21,500.00

Jumlah Harga Bahan (B) Rp. 729,197.40


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 1,091,224.30
E Overhead & Profit 10% x D Rp. 109,122.43
F Harga Satuan Pekerjaan ( D + E ) Rp. 1,200,346.73
G Dibulatkan Rp. 1,200,346.73
Analisa : AHSP A.4.1.1.2
Item : Membuat Beton Mutu f'c = 9.8 MPa (K-125), Slump (12 ± 2 ) cm, w/c = 0.78
Satuan : m3

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 1.650 Rp. 174,748.00 Rp. 288,334.20
Tukang L.02 OH 0.275 Rp. 183,834.00 Rp. 50,554.35
Kepala Tukang L.03 OH 0.028 Rp. 199,782.00 Rp. 5,593.90
Mandor L.04 OH 0.083 Rp. 211,379.00 Rp. 17,544.46
Jumlah Tenaga Kerja (A) Rp. 362,026.90
B BAHAN
Semen @ 40 Kg Kg 276.000 Rp. 1,450.00 Rp. 400,200.00
Pasir Beton (1400 kg/m3) Kg 828.000 Rp. 155.00 Rp. 128,340.00
Kerikil (1350 kg/m3) Kg 1,012.000 Rp. 160.74 Rp. 162,669.63
Air Liter 215.000 Rp. 100.00 Rp. 21,500.00

Jumlah Harga Bahan (B) Rp. 712,709.63


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 1,074,736.53
E Overhead & Profit 10% x D Rp. 107,473.65
F Harga Satuan Pekerjaan ( D + E ) Rp. 1,182,210.19
G Dibulatkan Rp. 1,182,210.19

Analisa : AHSP A.4.1.1.3


Item : Membuat Beton Mutu f'c = 12.2 MPa (K-150), Slump (12 ± 2 ) cm, w/c = 0.72
Satuan : m3

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 1.650 Rp. 174,748.00 Rp. 288,334.20
Tukang L.02 OH 0.275 Rp. 183,834.00 Rp. 50,554.35
Kepala Tukang L.03 OH 0.028 Rp. 199,782.00 Rp. 5,593.90
Mandor L.04 OH 0.082 Rp. 211,379.00 Rp. 17,438.77
Jumlah Tenaga Kerja (A) Rp. 361,921.21
B BAHAN
Semen @ 40 Kg Kg 299.000 Rp. 1,450.00 Rp. 433,550.00
Pasir Beton (1400 kg/m3) Kg 799.000 Rp. 155.00 Rp. 123,845.00
Kerikil (1350 kg/m3) Kg 1,017.000 Rp. 160.74 Rp. 163,473.33
Air Liter 215.000 Rp. 100.00 Rp. 21,500.00

Jumlah Harga Bahan (B) Rp. 742,368.33


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 1,104,289.55
E Overhead & Profit 10% x D Rp. 110,428.95
F Harga Satuan Pekerjaan ( D + E ) Rp. 1,214,718.50
G Dibulatkan Rp. 1,214,718.50
Analisa : AHSP A.0.0.7
Item : Membuat Lantai Kerja Beton Mutu f'c = 7.4 MPa (K-100), Slump (3 - 6 ) cm, w/c = 0.87
Satuan : m3

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 1.200 Rp. 174,748.00 Rp. 209,697.60
Tukang L.02 OH 0.200 Rp. 183,834.00 Rp. 36,766.80
Kepala Tukang L.03 OH 0.020 Rp. 199,782.00 Rp. 3,995.64
Mandor L.04 OH 0.120 Rp. 211,379.00 Rp. 25,365.48
Jumlah Tenaga Kerja (A) Rp. 275,825.52
B BAHAN
Semen @ 40 Kg Kg 227 Rp. 1,399.98 Rp. 317,794.32
Pasir Beton (1400 kg/m3) Kg 869 Rp. 203.57 Rp. 176,903.57
Kerikil (1350 kg/m3) Kg 1,000 Rp. 185.19 Rp. 185,185.19
Air Liter 215 Rp. 100.00 Rp. 21,500.00

Jumlah Harga Bahan (B) Rp. 701,383.08


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 977,208.60
E Overhead & Profit 10% x D Rp. 97,720.86
F Harga Satuan Pekerjaan ( D + E ) Rp. 1,074,929.46
G Dibulatkan Rp. 1,074,929.46

Analisa : AHSP A.4.1.1.5


Item : Membuat Beton Mutu f'c = 14.5 MPa (K-175), Slump (12 ± 2 ) cm, w/c = 0.66
Satuan : m3

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 1.650 Rp. 174,748.00 Rp. 288,334.20
Tukang L.02 OH 0.275 Rp. 183,834.00 Rp. 50,554.35
Kepala Tukang L.03 OH 0.028 Rp. 199,782.00 Rp. 5,593.90
Mandor L.04 OH 0.083 Rp. 211,379.00 Rp. 17,544.46
Jumlah Tenaga Kerja (A) Rp. 362,026.90
B BAHAN
Semen @ 40 Kg Kg 326.000 Rp. 1,120.00 Rp. 365,120.00
Pasir Beton (1400 kg/m3) Kg 760.000 Rp. 203.57 Rp. 154,714.29
Kerikil (1350 kg/m3) Kg 1,029.000 Rp. 185.19 Rp. 190,555.56
Air Liter 215.000 Rp. 100.00 Rp. 21,500.00

Jumlah Harga Bahan (B) Rp. 731,889.84


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 1,093,916.74
E Overhead & Profit 10% x D Rp. 109,391.67
F Harga Satuan Pekerjaan ( D + E ) Rp. 1,203,308.42
G Dibulatkan Rp. 1,203,308.42
Analisa : AHSP A.4.1.1.6
Item : Membuat Beton Mutu f'c = 16.9 MPa (K-200), Slump (12 ± 2 ) cm, w/c = 0.61
Satuan : m3

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 1.650 Rp. 174,748.00 Rp. 288,334.20
Tukang L.02 OH 0.275 Rp. 183,834.00 Rp. 50,554.35
Kepala Tukang L.03 OH 0.028 Rp. 199,782.00 Rp. 5,593.90
Mandor L.04 OH 0.083 Rp. 211,379.00 Rp. 17,544.46
Jumlah Tenaga Kerja (A) Rp. 362,026.90
B BAHAN
Semen @ 40 Kg Kg 352.000 Rp. 1,450.00 Rp. 510,400.00
Pasir Beton (1400 kg/m3) Kg 731.000 Rp. 155.00 Rp. 113,305.00
Batu pecah 2-3 cm Kg 1,031.000 Rp. 244.44 Rp. 252,022.22
Air Liter 215.000 Rp. 100.00 Rp. 21,500.00

Jumlah Harga Bahan (B) Rp. 897,227.22


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 1,259,254.13
E Overhead & Profit 10% x D Rp. 125,925.41
F Harga Satuan Pekerjaan ( D + E ) Rp. 1,385,179.54
G Dibulatkan Rp. 1,385,179.54

Analisa : AHSP A.0.0.8


Item : Membuat Beton Mutu f'c = 19.3 MPa (K-225), Slump (12 ± 2 ) cm, w/c = 0.58
Satuan : m3

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 1.650 Rp. 174,748.00 Rp. 288,334.20
Tukang L.02 OH 0.275 Rp. 183,834.00 Rp. 50,554.35
Kepala Tukang L.03 OH 0.028 Rp. 199,782.00 Rp. 5,593.90
Mandor L.04 OH 0.083 Rp. 211,379.00 Rp. 17,544.46
Jumlah Tenaga Kerja (A) Rp. 362,026.90
B BAHAN
Semen @ 40 Kg Kg 371.000 Rp. 1,120.00 Rp. 415,520.00
Pasir Beton (1400 kg/m3) kg 698.000 Rp. 203.57 Rp. 142,092.86
Batu pecah 2-3 cm Kg 1,047.000 Rp. 185.19 Rp. 193,888.89
Air Liter 215.000 Rp. 100.00 Rp. 21,500.00

Jumlah Harga Bahan (B) Rp. 773,001.75


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 1,135,028.65
E Overhead & Profit 10% x D Rp. 113,502.86
F Harga Satuan Pekerjaan ( D + E ) Rp. 1,248,531.51
G Dibulatkan Rp. 1,248,531.51
Analisa : AHSP A.4.1.1.8
Item : Membuat Beton Mutu f'c = 21.7 MPa (K-250), Slump (12 ± 2 ) cm, w/c = 0.56
Satuan : m3

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 1.650 Rp. 174,748.00 Rp. 288,334.20
Tukang L.02 OH 0.275 Rp. 183,834.00 Rp. 50,554.35
Kepala Tukang L.03 OH 0.028 Rp. 199,782.00 Rp. 5,593.90
Mandor L.04 OH 0.083 Rp. 211,379.00 Rp. 17,544.46
Jumlah Tenaga Kerja (A) Rp. 362,026.90
B BAHAN
Semen @ 40 Kg Kg 384.000 Rp. 1,120.00 Rp. 430,080.00
Pasir Beton (1400 kg/m3) Kg 692.000 Rp. 203.57 Rp. 140,871.43
Batu pecah 2-3 cm Kg 1,039.000 Rp. 185.19 Rp. 192,407.41
Air Liter 215.000 Rp. 50.00 Rp. 10,750.00

Jumlah Harga Bahan (B) Rp. 774,108.84


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 1,136,135.74
E Overhead & Profit 10% x D Rp. 113,613.57
F Harga Satuan Pekerjaan ( D + E ) Rp. 1,249,749.31
G Dibulatkan Rp. 1,249,749.31

Analisa : AHSP A.4.1.1.9


Item : Membuat Beton Mutu f'c = 24.0 MPa (K-275), Slump (12 ± 2 ) cm, w/c = 0.53
Satuan : m3

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 1.650 Rp. 174,748.00 Rp. 288,334.20
Tukang L.02 OH 0.275 Rp. 183,834.00 Rp. 50,554.35
Kepala Tukang L.03 OH 0.028 Rp. 199,782.00 Rp. 5,593.90
Mandor L.04 OH 0.083 Rp. 211,379.00 Rp. 17,544.46
Jumlah Tenaga Kerja (A) Rp. 362,026.90
B BAHAN
Semen @ 40 Kg Kg 406.000 Rp. 1,450.00 Rp. 588,700.00
Pasir Beton (1400 kg/m3) Kg 684.000 Rp. 155.00 Rp. 106,020.00
Batu pecah 2-3 cm Kg 1,026.000 Rp. 244.44 Rp. 250,800.00
Air Liter 215.000 Rp. 100.00 Rp. 21,500.00

Jumlah Harga Bahan (B) Rp. 967,020.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 1,329,046.90
E Overhead & Profit 10% x D Rp. 132,904.69
F Harga Satuan Pekerjaan ( D + E ) Rp. 1,461,951.59
G Dibulatkan Rp. 1,461,951.59
Analisa : AHSP A.0.0.9
Item : Membuat Beton Mutu f'c = 26.4 MPa (K-300), Slump (12 ± 2 ) cm, w/c = 0.52
Satuan : m3

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 1.650 Rp. 174,748.00 Rp. 288,334.20
Tukang L.02 OH 0.275 Rp. 183,834.00 Rp. 50,554.35
Kepala Tukang L.03 OH 0.028 Rp. 199,782.00 Rp. 5,593.90
Mandor L.04 OH 0.083 Rp. 211,379.00 Rp. 17,544.46
Jumlah Tenaga Kerja (A) Rp. 362,026.90
B BAHAN
Semen @ 40 Kg Kg 413.000 Rp. 1,399.98 Rp. 578,189.67
Pasir Beton (1400 kg/m3) Kg 681.000 Rp. 203.57 Rp. 138,632.14
Batu pecah 2-3 cm Kg 1,021.000 Rp. 185.19 Rp. 189,074.07
Air Liter 215.000 Rp. 100.00 Rp. 21,500.00

Jumlah Harga Bahan (B) Rp. 927,395.89


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 1,289,422.79
E Overhead & Profit 10% x D Rp. 128,942.28
F Harga Satuan Pekerjaan ( D + E ) Rp. 1,418,365.07
G Dibulatkan Rp. 1,418,365.07

Analisa : AHSP A.4.1.1.11


Item : Membuat Beton Mutu f'c = 28.8 MPa (K-325), Slump (12 ± 2 ) cm, w/c = 0.49
Satuan : m3

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 2.100 Rp. 174,748.00 Rp. 366,970.80
Tukang L.02 OH 0.350 Rp. 183,834.00 Rp. 64,341.90
Kepala Tukang L.03 OH 0.035 Rp. 199,782.00 Rp. 6,992.37
Mandor L.04 OH 0.105 Rp. 211,379.00 Rp. 22,194.80
Jumlah Tenaga Kerja (A) Rp. 460,499.86
B BAHAN
Semen @ 40 Kg Kg 439.000 Rp. 1,450.00 Rp. 636,550.00
Pasir Beton (1400 kg/m3) Kg 670.000 Rp. 155.00 Rp. 103,850.00
Batu pecah 2-3 cm Kg 1,006.000 Rp. 244.44 Rp. 245,911.11
Air Liter 215.000 Rp. 100.00 Rp. 21,500.00

Jumlah Harga Bahan (B) Rp. 1,007,811.11


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 1,468,310.98
E Overhead & Profit 10% x D Rp. 146,831.10
F Harga Satuan Pekerjaan ( D + E ) Rp. 1,615,142.07
G Dibulatkan Rp. 1,615,142.07
Analisa : AHSP A.4.1.1.12
Item : Membuat Beton Mutu f'c = 31.2 MPa (K-350), Slump (12 ± 2 ) cm, w/c = 0.48
Satuan : m3

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 2.100 Rp. 174,748.00 Rp. 366,970.80
Tukang L.02 OH 0.350 Rp. 183,834.00 Rp. 64,341.90
Kepala Tukang L.03 OH 0.035 Rp. 199,782.00 Rp. 6,992.37
Mandor L.04 OH 0.105 Rp. 211,379.00 Rp. 22,194.80
Jumlah Tenaga Kerja (A) Rp. 460,499.86
B BAHAN
Semen @ 40 Kg Kg 448.000 Rp. 1,450.00 Rp. 649,600.00
Pasir Beton (1400 kg/m3) Kg 667.000 Rp. 155.00 Rp. 103,385.00
Batu pecah 2-3 cm Kg 1,000.000 Rp. 244.44 Rp. 244,444.44
Air Liter 215.000 Rp. 100.00 Rp. 21,500.00

Jumlah Harga Bahan (B) Rp. 1,018,929.44


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 1,479,429.31
E Overhead & Profit 10% x D Rp. 147,942.93
F Harga Satuan Pekerjaan ( D + E ) Rp. 1,627,372.24
G Dibulatkan Rp. 1,627,372.24

Analisa : AHSP A.4.1.1.13


Item : Membuat Beton Kedap Air Dengan Strorox - 100
Satuan : m3

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 2.100 Rp. 174,748.00 Rp. 366,970.80
Tukang L.02 OH 0.350 Rp. 183,834.00 Rp. 64,341.90
Kepala Tukang L.03 OH 0.035 Rp. 199,782.00 Rp. 6,992.37
Mandor L.04 OH 0.105 Rp. 211,379.00 Rp. 22,194.80
Jumlah Tenaga Kerja (A) Rp. 460,499.86
B BAHAN
Semen @ 40 Kg Kg 400.000 Rp. 1,450.00 Rp. 580,000.00
Pasir Beton (1400 kg/m3) M3 0.480 Rp. 217,000.00 Rp. 104,160.00
Batu pecah 2-3 cm (1350 Kg/m3) M3 0.800 Rp. 330,000.00 Rp. 264,000.00
Storox - 100 Kg 1.200 Rp. 120,000.00 Rp. 144,000.00

Jumlah Harga Bahan (B) Rp. 1,092,160.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 1,552,659.87
E Overhead & Profit 10% x D Rp. 155,265.99
F Harga Satuan Pekerjaan ( D + E ) Rp. 1,707,925.85
G Dibulatkan Rp. 1,707,925.85
Analisa : AHSP A.4.1.1.17
Item : Pembesian 10 Kg Dengan Besi Beton Polos
Satuan : Kg

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.070 Rp. 174,748.00 Rp. 12,232.36
Tukang L.02 OH 0.070 Rp. 183,834.00 Rp. 12,868.38
Kepala Tukang L.03 OH 0.007 Rp. 199,782.00 Rp. 1,398.47
Mandor L.04 OH 0.004 Rp. 211,379.00 Rp. 845.52
Jumlah Tenaga Kerja (A) Rp. 27,344.73
B BAHAN
Besi Beton Polos Kg 10.500 Rp. 10,440.00 Rp. 109,620.00
Kawat Beton Kg 0.150 Rp. 16,750.00 Rp. 2,512.50

Jumlah Harga Bahan (B) Rp. 112,132.50


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 139,477.23
E Overhead & Profit 10% x D Rp. 13,947.72
F Harga Satuan Pekerjaan ( D + E ) Rp. 153,424.95
G Harga Satuan Pekerjaan Besi Untuk 1 Kg F / 10 Rp. 15,342.50
H Dibulatkan Rp. 15,342.50

Analisa : AHSP A.4.1.1.17.a


Item : Pembesian 10 Kg Dengan Besi Beton Ulir
Satuan : Kg

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.070 Rp. 174,748.00 Rp. 12,232.36
Tukang L.02 OH 0.070 Rp. 183,834.00 Rp. 12,868.38
Kepala Tukang L.03 OH 0.007 Rp. 199,782.00 Rp. 1,398.47
Mandor L.04 OH 0.004 Rp. 211,379.00 Rp. 845.52
Jumlah Tenaga Kerja (A) Rp. 27,344.73
B BAHAN
Besi Beton Ulir Kg 10.500 Rp. 12,000.00 Rp. 126,000.00
Kawat Beton Kg 0.150 Rp. 16,750.00 Rp. 2,512.50

Jumlah Harga Bahan (B) Rp. 128,512.50


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 155,857.23
E Overhead & Profit 10% x D Rp. 15,585.72
F Harga Satuan Pekerjaan ( D + E ) Rp. 171,442.95
G Harga Satuan Pekerjaan Besi Untuk 1 Kg F / 10 Rp. 17,144.30
H Dibulatkan Rp. 17,144.30
Analisa : AHSP A.4.1.1.18.
Item : Pemasangan 10 Kg Kabel Presstressed Polos/Strands
Satuan : Kg

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.050 Rp. 174,748.00 Rp. 8,737.40
Tukang L.02 OH 0.050 Rp. 183,834.00 Rp. 9,191.70
Kepala Tukang L.03 OH 0.005 Rp. 199,782.00 Rp. 998.91
Mandor L.04 OH 0.003 Rp. 211,379.00 Rp. 528.45
Jumlah Tenaga Kerja (A) Rp. 19,456.46
B BAHAN
Besi Beton Polos Kg 10.500 Rp. 12,000.00 Rp. 126,000.00
Kawat Beton Kg 0.100 Rp. 22,000.00 Rp. 2,200.00

Jumlah Harga Bahan (B) Rp. 128,200.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 147,656.46
E Overhead & Profit 10% x D Rp. 14,765.65
F Harga Satuan Pekerjaan ( D + E ) Rp. 162,422.10
G Harga Satuan Pekerjaan Besi Untuk 1 Kg F / 10 Rp. 16,242.21
H Dibulatkan Rp. 16,242.00

Analisa : AHSP A.4.1.1.18.a


Item : Pemasangan 10 Kg Kabel Presstressed Ulir/Strands
Satuan : Kg

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.050 Rp. 174,748.00 Rp. 8,737.40
Tukang L.02 OH 0.050 Rp. 183,834.00 Rp. 9,191.70
Kepala Tukang L.03 OH 0.005 Rp. 199,782.00 Rp. 998.91
Mandor L.04 OH 0.003 Rp. 211,379.00 Rp. 634.14
Jumlah Tenaga Kerja (A) Rp. 19,562.15
B BAHAN
Besi Beton Ulir Kg 10.500 Rp. 14,000.00 Rp. 147,000.00
Kawat Beton Kg 0.100 Rp. 22,000.00 Rp. 2,200.00

Jumlah Harga Bahan (B) Rp. 149,200.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 168,762.15
E Overhead & Profit 10% x D Rp. 16,876.21
F Harga Satuan Pekerjaan ( D + E ) Rp. 185,638.36
G Harga Satuan Pekerjaan Besi Untuk 1 Kg F / 10 Rp. 18,563.84
H Dibulatkan Rp. 18,563.00
Analisa : AHSP A.4.1.1.19
Item : Pemasangan 10 Kg Jaring Kawat Baja (Wiremesh), Wiremesh Dia. 5 mm
Satuan : Kg

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.025 Rp. 174,748.00 Rp. 4,368.70
Tukang L.02 OH 0.025 Rp. 183,834.00 Rp. 4,595.85
Kepala Tukang L.03 OH 0.002 Rp. 199,782.00 Rp. 399.56
Mandor L.04 OH 0.001 Rp. 211,379.00 Rp. 211.38
Jumlah Tenaga Kerja (A) Rp. 9,575.49
B BAHAN
Wiremesh (Ulir) Dia. 5.0 Kg 10.200 Rp. 12,183.68 Rp. 124,273.59
Kawat Beton Kg 0.050 Rp. 22,000.00 Rp. 1,100.00

Jumlah Harga Bahan (B) Rp. 125,373.59


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 134,949.08
E Overhead & Profit 10% x D Rp. 13,494.91
F Harga Satuan Pekerjaan ( D + E ) Rp. 148,443.99
G Harga Satuan Pekerjaan Besi Untuk 1 Kg F / 10 Rp. 14,844.40
H Dibulatkan Rp. 14,844.00

Analisa : AHSP A.4.1.1.19.a


Item : Pemasangan 10 Kg Jaring Kawat Baja (Wiremesh), Wiremesh Dia. 8 mm
Satuan : Kg

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.025 Rp. 174,748.00 Rp. 4,368.70
Tukang L.02 OH 0.025 Rp. 183,834.00 Rp. 4,595.85
Kepala Tukang L.03 OH 0.025 Rp. 199,782.00 Rp. 4,994.55
Mandor L.04 OH 0.001 Rp. 211,379.00 Rp. 211.38
Jumlah Tenaga Kerja (A) Rp. 14,170.48
B BAHAN
wiremesh dia 8mm kg 10.200 Rp. 11,166.86 Rp. 113,901.93
Kawat Beton Kg 0.050 Rp. 22,000.00 Rp. 1,100.00

Jumlah Harga Bahan (B) Rp. 115,001.93


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 129,172.40
E Overhead & Profit 10% x D Rp. 12,917.24
F Harga Satuan Pekerjaan ( D + E ) Rp. 142,089.65
G Harga Satuan Pekerjaan Besi Untuk 1 Kg F / 10 Rp. 14,208.96
H Dibulatkan Rp. 14,208.00

Analisa : AHSP A.4.1.1.19.a


Item : Pemasangan 10 Kg Jaring Kawat Baja (Wiremesh), Wiremesh Dia. 10 mm
Satuan : Kg

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.025 Rp. 174,748.00 Rp. 4,368.70
Tukang L.02 OH 0.025 Rp. 183,834.00 Rp. 4,595.85
Kepala Tukang L.03 OH 0.025 Rp. 199,782.00 Rp. 4,994.55
Mandor L.04 OH 0.001 Rp. 211,379.00 Rp. 211.38
Jumlah Tenaga Kerja (A) Rp. 14,170.48
B BAHAN
wiremesh dia 10mm kg 10.200 Rp. 11,008.37 Rp. 112,285.34
Kawat Beton Kg 0.050 Rp. 22,000.00 Rp. 1,100.00

Jumlah Harga Bahan (B) Rp. 113,385.34


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 127,555.82
E Overhead & Profit 10% x D Rp. 12,755.58
F Harga Satuan Pekerjaan ( D + E ) Rp. 140,311.40
G Harga Satuan Pekerjaan Besi Untuk 1 Kg F / 10 Rp. 14,031.14
H Dibulatkan Rp. 14,031.00
Analisa : AHSP A.4.1.1.20
Item : Pemasangan Bekesting Untuk Pondasi
Satuan : m2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.520 Rp. 174,748.00 Rp. 90,868.96
Tukang L.02 OH 0.260 Rp. 183,834.00 Rp. 47,796.84
Kepala Tukang L.03 OH 0.026 Rp. 199,782.00 Rp. 5,194.33
Mandor L.04 OH 0.026 Rp. 211,379.00 Rp. 5,495.85
Jumlah Tenaga Kerja (A) Rp. 149,355.99
B BAHAN
Kayu Kelas III (Borneo/dll) M3 0.040 Rp. 1,500,000.00 Rp. 60,000.00
Paku Biasa 5 cm - 10 cm Kg 0.300 Rp. 13,560.00 Rp. 4,068.00
Minyak Bekesting Liter 0.100 Rp. 6,500.00 Rp. 650.00

Jumlah Harga Bahan (B) Rp. 64,718.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 214,073.99
E Overhead & Profit 10% x D Rp. 21,407.40
F Harga Satuan Pekerjaan ( D + E ) Rp. 235,481.38
G Untuk 2x Pemakaian Rp. 117,740.69
H Dibulatkan Rp. 117,740.69

Analisa : AHSP A.4.1.1.21


Item : Pemasangan Bekesting Untuk Sloof
Satuan : m2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.520 Rp. 174,748.00 Rp. 90,868.96
Tukang L.02 OH 0.260 Rp. 183,834.00 Rp. 47,796.84
Kepala Tukang L.03 OH 0.026 Rp. 199,782.00 Rp. 5,194.33
Mandor L.04 OH 0.026 Rp. 211,379.00 Rp. 5,495.85
Jumlah Tenaga Kerja (A) Rp. 149,355.99
B BAHAN
Kayu Kelas III (Borneo/dll) M3 0.045 Rp. 2,500,000.00 Rp. 112,500.00
Paku Biasa 5 cm - 10 cm Kg 0.300 Rp. 13,560.00 Rp. 4,068.00
Minyak Bekesting Liter 0.100 Rp. 21,250.00 Rp. 2,125.00

Jumlah Harga Bahan (B) Rp. 118,693.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 268,048.99
E Overhead & Profit 10% x D Rp. 26,804.90
F Harga Satuan Pekerjaan ( D + E ) Rp. 294,853.88
G Untuk 2x Pemakaian Rp. 147,426.94
H Dibulatkan Rp. 147,426.94
Analisa : AHSP A.4.1.1.22
Item : Pemasangan Bekesting Untuk Kolom
Satuan : m2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.660 Rp. 174,748.00 Rp. 115,333.68
Tukang L.02 OH 0.330 Rp. 183,834.00 Rp. 60,665.22
Kepala Tukang L.03 OH 0.033 Rp. 199,782.00 Rp. 6,592.81
Mandor L.04 OH 0.033 Rp. 211,379.00 Rp. 6,975.51
Jumlah Tenaga Kerja (A) Rp. 189,567.21
B BAHAN
Kayu Kelas III (Borneo/dll) M3 0.040 Rp. 1,500,000.00 Rp. 60,000.00
Paku Biasa 5 cm - 10 cm Kg 0.400 Rp. 13,560.00 Rp. 5,424.00
Minyak Bekesting Liter 0.200 Rp. 21,250.00 Rp. 4,250.00
Kayu Kelas II (Kamper/Kruing/dll) M3 0.015 Rp. 1,500,000.00 Rp. 22,500.00
Multipleks 9 mm Lembar 0.350 Rp. 85,000.00 Rp. 29,750.00
Kayu Dolken Ø 8-10/400 cm Batang 2.000 Rp. 45,000.00 Rp. 90,000.00
Jumlah Harga Bahan (B) Rp. 211,924.00
C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 401,491.21
E Overhead & Profit 10% x D Rp. 40,149.12
F Harga Satuan Pekerjaan ( D + E ) Rp. 441,640.33
G Untuk 2x Pemakaian Rp. 220,820.17
H Dibulatkan Rp. 220,820.17

Analisa : AHSP A.0.0.10


Item : Pemasangan Bekesting Untuk Balok
Satuan : m2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.660 Rp. 174,748.00 Rp. 115,333.68
Tukang L.02 OH 0.330 Rp. 183,834.00 Rp. 60,665.22
Kepala Tukang L.03 OH 0.033 Rp. 199,782.00 Rp. 6,592.81
Mandor L.04 OH 0.033 Rp. 211,379.00 Rp. 6,975.51
Jumlah Tenaga Kerja (A) Rp. 189,567.21
B BAHAN
Kayu Kelas III (Borneo/dll) M3 0.040 Rp. 1,500,000.00 Rp. 60,000.00
Paku Biasa 5 cm - 10 cm Kg 0.400 Rp. 13,560.00 Rp. 5,424.00
Minyak Bekesting Liter 0.200 Rp. 21,250.00 Rp. 4,250.00
Kayu Kelas II (Kamper/Kruing/dll) M3 0.018 Rp. 1,500,000.00 Rp. 27,000.00
Multipleks 9 mm Lembar 0.350 Rp. 85,000.00 Rp. 29,750.00
Kayu Dolken Ø 8-10/400 cm Batang 2.000 Rp. 15,000.00 Rp. 30,000.00
Jumlah Harga Bahan (B) Rp. 156,424.00
C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 345,991.21
E Overhead & Profit 10% x D Rp. 34,599.12
F Harga Satuan Pekerjaan ( D + E ) Rp. 380,590.33
G Untuk 2x Pemakaian Rp. 190,295.17
H Dibulatkan Rp. 190,295.17
Analisa : AHSP A.0.0.11
Item : Pemasangan Bekesting Untuk Lantai
Satuan : m2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.660 Rp. 174,748.00 Rp. 115,333.68
Tukang L.02 OH 0.330 Rp. 183,834.00 Rp. 60,665.22
Kepala Tukang L.03 OH 0.033 Rp. 199,782.00 Rp. 6,592.81
Mandor L.04 OH 0.033 Rp. 211,379.00 Rp. 6,975.51
Jumlah Tenaga Kerja (A) Rp. 189,567.21
B BAHAN
Kayu Kelas III (Borneo/dll) M3 0.040 Rp. 1,500,000.00 Rp. 60,000.00
Paku Biasa 5 cm - 10 cm Kg 0.400 Rp. 13,560.00 Rp. 5,424.00
Minyak Bekesting Liter 0.200 Rp. 21,250.00 Rp. 4,250.00
Multipleks 9 mm Lembar 0.350 Rp. 85,000.00 Rp. 29,750.00
Balok Kayu m3 0.015 Rp. 1,500,000.00 Rp. 22,500.00
Kayu Dolken Ø 8-10/400 cm Batang 6.000 Rp. 30,000.00 Rp. 180,000.00
Jumlah Harga Bahan (B) Rp. 301,924.00
C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 491,491.21
E Overhead & Profit 10% x D Rp. 49,149.12
F Harga Satuan Pekerjaan ( D + E ) Rp. 540,640.33
G Untuk 2x Pemakaian Rp. 270,320.17
H Dibulatkan Rp. 270,320.17

Analisa : AHSP A.4.1.1.25


Item : Pemasangan Bekesting Untuk Dinding
Satuan : m2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.660 Rp. 174,748.00 Rp. 115,333.68
Tukang L.02 OH 0.330 Rp. 183,834.00 Rp. 60,665.22
Kepala Tukang L.03 OH 0.033 Rp. 199,782.00 Rp. 6,592.81
Mandor L.04 OH 0.033 Rp. 211,379.00 Rp. 6,975.51
Jumlah Tenaga Kerja (A) Rp. 189,567.21
B BAHAN
Kayu Kelas III (Borneo/dll) M3 0.030 Rp. 4,500,000.00 Rp. 135,000.00
Paku Biasa 5 cm - 10 cm Kg 0.400 Rp. 20,000.00 Rp. 8,000.00
Minyak Bekesting Liter 0.200 Rp. 6,500.00 Rp. 1,300.00
Kayu Kelas II (Kamper/Kruing/dll) M3 0.020 Rp. 5,500,000.00 Rp. 110,000.00
Multipleks 9 mm Lembar 0.350 Rp. 135,000.00 Rp. 47,250.00
Kayu Dolken Ø 8-10/400 cm Batang 3.000 Rp. 17,000.00 Rp. 51,000.00
Penjaga Jarak Bekesting (Spacer) bh 4.000 Rp. 25,000.00 Rp. 100,000.00
Jumlah Harga Bahan (B) Rp. 452,550.00
C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 452,550.00
E Overhead & Profit 10% x D Rp. 45,255.00
F Harga Satuan Pekerjaan ( D + E ) Rp. 497,805.00
G Untuk 2x Pemakaian Rp. 248,902.50
H Dibulatkan Rp. 248,902.00
Analisa : AHSP A.4.1.1.26
Item : Pemasangan Bekesting Untuk Tangga
Satuan : m2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.660 Rp. 174,748.00 Rp. 115,333.68
Tukang L.02 OH 0.330 Rp. 183,834.00 Rp. 60,665.22
Kepala Tukang L.03 OH 0.033 Rp. 199,782.00 Rp. 6,592.81
Mandor L.04 OH 0.033 Rp. 211,379.00 Rp. 6,975.51
Jumlah Tenaga Kerja (A) Rp. 189,567.21
B BAHAN
Kayu Kelas III (Borneo/dll) M3 0.030 Rp. 4,500,000.00 Rp. 135,000.00
Paku Biasa 5 cm - 10 cm Kg 0.400 Rp. 20,000.00 Rp. 8,000.00
Minyak Bekesting Liter 0.150 Rp. 6,500.00 Rp. 975.00
Kayu Kelas II (Kamper/Kruing/dll) M3 0.015 Rp. 5,500,000.00 Rp. 82,500.00
Multipleks 9 mm Lembar 0.350 Rp. 135,000.00 Rp. 47,250.00
Kayu Dolken Ø 8-10/400 cm Batang 2.000 Rp. 17,000.00 Rp. 34,000.00
Jumlah Harga Bahan (B) Rp. 307,725.00
C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 497,292.21
E Overhead & Profit 10% x D Rp. 49,729.22
F Harga Satuan Pekerjaan ( D + E ) Rp. 547,021.43
G Untuk 2x Pemakaian Rp. 273,510.72
H Dibulatkan Rp. 273,510.72

AHSP A.4.2.1. HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM

Analisa : AHSP A.4.2.1.1


Item : Pemasangan Besi profil
Satuan : Kg

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.060 Rp. 174,748.00 Rp. 10,484.88
Tukang L.02 OH 0.060 Rp. 183,834.00 Rp. 11,030.04
Kepala Tukang L.03 OH 0.006 Rp. 199,782.00 Rp. 1,198.69
Mandor L.04 OH 0.003 Rp. 211,379.00 Rp. 634.14
Jumlah Tenaga Kerja (A) Rp. 23,347.75
B BAHAN
Besi Profil Kg 1.150 Rp. 75,000.00 Rp. 86,250.00
Assesories ( Perkuatan, Las dll ) Ls 100% x Rangka Rp. 75,000.00 Rp. 75,000.00

Jumlah Harga Bahan (B) Rp. 161,250.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 184,597.75
E Overhead & Profit 10% x D Rp. 18,459.77
F Harga Satuan Pekerjaan ( D + E ) Rp. 203,057.52
G Dibulatkan Rp. 203,057.00

Analisa : AHSP A.0.0.12


Item : Pemasangan rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, untuk partisi
Satuan : m2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.250 Rp. 174,748.00 Rp. 43,687.00
Tukang L.02 OH 0.250 Rp. 183,834.00 Rp. 45,958.50
Kepala Tukang L.03 OH 0.025 Rp. 199,782.00 Rp. 4,994.55
Mandor L.04 OH 0.013 Rp. 211,379.00 Rp. 2,642.24
Jumlah Tenaga Kerja (A) Rp. 97,282.29
B BAHAN
Besi Hollow 40.40.2 mm m 3.500 Rp. 4,500.00 Rp. 15,750.00
Assesories ( Perkuatan, Las dll ) Ls 100% x Rangka Rp. 15,750.00 Rp. 15,750.00

Jumlah Harga Bahan (B) Rp. 31,500.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 128,782.29
E Overhead & Profit 10% x D Rp. 12,878.23
F Harga Satuan Pekerjaan ( D + E ) Rp. 141,660.52
G Dibulatkan Rp. 141,660.00

Analisa : AHSP A.4.2.1.21


Item : Pemasangan rangka besi hollow 1x40.40.3mm, modul 60 x 120 cm, untuk Plafond
Satuan : m2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.350 Rp. 174,748.00 Rp. 61,161.80
Tukang L.02 OH 0.350 Rp. 183,834.00 Rp. 64,341.90
Kepala Tukang L.03 OH 0.035 Rp. 199,782.00 Rp. 6,992.37
Mandor L.04 OH 0.017 Rp. 211,379.00 Rp. 3,699.13
Jumlah Tenaga Kerja (A) Rp. 136,195.20
B BAHAN
Besi hollow 40x40 btg 1.000 Rp. 30,000.00 Rp. 30,000.00
Plafond PVC lbr 5.000 Rp -
Assesories ( Perkuatan, Las dll ) Ls 100% x Rangka Rp. 7,500.00 Rp. 7,500.00

Jumlah Harga Bahan (B) Rp. 37,500.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 173,695.20
E Overhead & Profit 10% x D Rp. 17,369.52
F Harga Satuan Pekerjaan ( D + E ) Rp. 191,064.72
G Dibulatkan Rp. 191,064.00

Analisa : AHSP A.4.2.1.22


Item : (K3) Pemasangan Atap Pelana Rangka Atap Baja Canal Dingin Profil C75
Satuan : m2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.734 Rp. 174,748.00 Rp. 128,265.03
Tukang L.02 OH 0.734 Rp. 183,834.00 Rp. 134,934.16
Kepala Tukang L.03 OH 0.073 Rp. 199,782.00 Rp. 14,664.00
Mandor L.04 OH 0.037 Rp. 211,379.00 Rp. 7,757.61
Jumlah Tenaga Kerja (A) Rp. 285,620.80
B BAHAN
Baja Ringan Canai Dingin C75 btg 0.873 Rp. 96,500.00 Rp. 84,244.50

Jumlah Harga Bahan (B) Rp. 84,244.50


C PERALATAN
Peralatan % 10.000 Rp. 84,244.50 Rp. 8,424.45

Jumlah Harga Alat (C) Rp. 8,424.45


D Jumlah ( A + B + C ) Rp. 378,289.75
E Overhead & Profit 10% x D Rp. 37,828.97
F Harga Satuan Pekerjaan ( D + E ) Rp. 416,118.72
G Dibulatkan Rp. 416,118.00

Analisa : AHSP A.4.2.1.22.a


Item : (K3) Pemasangan Atap Pelana Rangka Atap Baja Canal Dingin Profil C75
Satuan : m2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.076 Rp. 174,748.00 Rp. 13,280.85
Tukang L.02 OH 0.113 Rp. 183,834.00 Rp. 20,773.24
Kepala Tukang L.03 OH 0.010 Rp. 199,782.00 Rp. 1,997.82
Mandor L.04 OH 0.007 Rp. 211,379.00 Rp. 1,479.65
Jumlah Tenaga Kerja (A) Rp. 37,531.56
B BAHAN
Rangka Baja Ringan m' 1.050 Rp. 96,500.00 Rp. 101,325.00
Alumunium Foil DS m2 1.000 Rp. 16,000.00 Rp. 16,000.00

Jumlah Harga Bahan (B) Rp. 117,325.00


C PERALATAN
Peralatan % 30.000 Rp. 101,325.00 Rp. 30,397.50
Jumlah Harga Alat (C) Rp. 30,397.50
D Jumlah ( A + B + C ) Rp. 185,254.06
E Overhead & Profit 10% x D Rp. 18,525.41
F Harga Satuan Pekerjaan ( D + E ) Rp. 203,779.47
G Dibulatkan Rp. 203,779.00

Analisa : AHSP A.4.2.1.23


Item : (K3) Pemasangan atap jurai rangka atap baja canai dingin Profil C75
Satuan : m2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.7604 Rp. 174,748.00 Rp. 132,878.38
Tukang L.02 OH 0.7604 Rp. 183,834.00 Rp. 139,787.37
Kepala Tukang L.03 OH 0.076 Rp. 199,782.00 Rp. 15,191.42
Mandor L.04 OH 0.038 Rp. 211,379.00 Rp. 8,036.63
Jumlah Tenaga Kerja (A) Rp. 295,893.81
B BAHAN
Baja Ringan Canai Dingin C75 kg 4.050 Rp. 96,500.00 Rp. 390,825.00

Jumlah Harga Bahan (B) Rp. 390,825.00


C PERALATAN
Peralatan % 10.000 Rp. 390,825.00 Rp. 39,082.50

Jumlah Harga Alat (C) Rp. 39,082.50


D Jumlah ( A + B + C ) Rp. 725,801.31
E Overhead & Profit 10% x D Rp. 72,580.13
F Harga Satuan Pekerjaan ( D + E ) Rp. 798,381.44
G Dibulatkan Rp. 798,381.00

AHSP A.4.4.1. HARGA SATUAN PEKERJAAN PASANGAN DINDING

Analisa : AHSP A.4.4.1.1


Item : Pemasangan Dinding Bata Merah (5x11x22) cm Tebal 1 Batu Camp. 1 SP : 2 PP
Satuan : m2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.600 Rp. 174,748.00 Rp. 104,848.80
Tukang L.02 OH 0.200 Rp. 183,834.00 Rp. 36,766.80
Kepala Tukang L.03 OH 0.020 Rp. 199,782.00 Rp. 3,995.64
Mandor L.04 OH 0.030 Rp. 211,379.00 Rp. 6,341.37
Jumlah Tenaga Kerja (A) Rp. 151,952.61
B BAHAN
Batu Bata Buah 140.000 Rp. 500.00 Rp. 70,000.00
Semen @ 40 Kg Kg 43.500 Rp. 1,120.00 Rp. 48,720.00
Pasir Pasang (1400 kg/m3) M3 0.080 Rp. 217,000.00 Rp. 17,360.00
Jumlah Harga Bahan (B) Rp. 136,080.00
C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 288,032.61
E Overhead & Profit 10% x D Rp. 28,803.26
F Harga Satuan Pekerjaan ( D + E ) Rp. 316,835.87
G Dibulatkan Rp. 316,835.87

Analisa : AHSP A.4.4.1.2


Item : Pemasangan Dinding Bata Merah (5x11x22) cm Tebal 1 Batu Camp. 1 SP : 3 PP
Satuan : m2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.600 Rp. 174,748.00 Rp. 104,848.80
Tukang L.02 OH 0.200 Rp. 183,834.00 Rp. 36,766.80
Kepala Tukang L.03 OH 0.020 Rp. 199,782.00 Rp. 3,995.64
Mandor L.04 OH 0.030 Rp. 211,379.00 Rp. 6,341.37
Jumlah Tenaga Kerja (A) Rp. 151,952.61
B BAHAN
Batu Bata Buah 140.000 Rp. 500.00 Rp. 70,000.00
Semen @ 40 Kg zak 0.824 Rp. 46,750.00 Rp. 38,510.31
Pasir Pasang (1400 kg/m3) M3 0.091 Rp. 221,285.71 Rp. 20,137.00

Jumlah Harga Bahan (B) Rp. 128,647.31


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 280,599.92
E Overhead & Profit 10% x D Rp. 28,059.99
F Harga Satuan Pekerjaan ( D + E ) Rp. 308,659.91
G Dibulatkan Rp. 308,659.91

Analisa : AHSP A.4.4.1.3


Item : Pemasangan Dinding Bata Merah (5x11x22) cm Tebal 1 Batu Camp. 1 SP : 4 PP
Satuan : m2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.600 Rp. 174,748.00 Rp. 104,848.80
Tukang L.02 OH 0.200 Rp. 183,834.00 Rp. 36,766.80
Kepala Tukang L.03 OH 0.020 Rp. 199,782.00 Rp. 3,995.64
Mandor L.04 OH 0.030 Rp. 211,379.00 Rp. 6,341.37
Jumlah Tenaga Kerja (A) Rp. 151,952.61
B BAHAN
Batu Bata Buah 140.000 Rp. 500.00 Rp. 70,000.00
Semen @ 40 Kg Kg 26.550 Rp. 1,120.00 Rp. 29,736.00
Pasir Pasang (1400 kg/m3) M3 0.093 Rp. 221,285.71 Rp. 20,579.57
Jumlah Harga Bahan (B) Rp. 120,315.57
C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 272,268.18
E Overhead & Profit 10% x D Rp. 27,226.82
F Harga Satuan Pekerjaan ( D + E ) Rp. 299,495.00
G Dibulatkan Rp. 299,495.00

Analisa : AHSP A.4.4.1.7


Item : Pemasangan Dinding Bata Merah (5x11x22) cm Tebal 1/2 Batu Camp. 1 SP : 2 PP
Satuan : m2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.300 Rp. 174,748.00 Rp. 52,424.40
Tukang L.02 OH 0.100 Rp. 183,834.00 Rp. 18,383.40
Kepala Tukang L.03 OH 0.010 Rp. 199,782.00 Rp. 1,997.82
Mandor L.04 OH 0.015 Rp. 211,379.00 Rp. 3,170.69
Jumlah Tenaga Kerja (A) Rp. 75,976.31
B BAHAN
Batu Bata Buah 70.000 Rp. 700.00 Rp. 49,000.00
Semen @ 40 Kg Kg 18.950 Rp. 1,450.00 Rp. 27,477.50
Pasir Pasang (1400 kg/m3) M3 0.0380 Rp. 217,000.00 Rp. 8,246.00

Jumlah Harga Bahan (B) Rp. 84,723.50


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 160,699.81
E Overhead & Profit 10% x D Rp. 16,069.98
F Harga Satuan Pekerjaan ( D + E ) Rp. 176,769.79
G Dibulatkan Rp. 176,769.79

Analisa : AHSP A.4.4.1.8


Item : Pemasangan Dinding Bata Merah (5x11x22) cm Tebal 1/2 Batu Camp. 1 SP : 3 PP
Satuan : m2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.300 Rp. 174,748.00 Rp. 52,424.40
Tukang L.02 OH 0.100 Rp. 183,834.00 Rp. 18,383.40
Kepala Tukang L.03 OH 0.010 Rp. 199,782.00 Rp. 1,997.82
Mandor L.04 OH 0.015 Rp. 211,379.00 Rp. 3,170.69
Jumlah Tenaga Kerja (A) Rp. 75,976.31
B BAHAN
Batu Bata Buah 70.000 Rp. 700.00 Rp. 49,000.00
Semen @ 40 Kg Kg 14.370 Rp. 1,450.00 Rp. 20,836.50
Pasir Pasang (1400 kg/m3) M3 0.0400 Rp. 217,000.00 Rp. 8,680.00

Jumlah Harga Bahan (B) Rp. 78,516.50


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 154,492.81
E Overhead & Profit 10% x D Rp. 15,449.28
F Harga Satuan Pekerjaan ( D + E ) Rp. 169,942.09
G Dibulatkan Rp. 169,942.09

Analisa : AHSP A.4.4.1.9


Item : Pemasangan Dinding Bata Merah (5x11x22) cm Tebal 1/2 Batu Camp. 1 SP : 4 PP
Satuan : m2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.300 Rp. 174,748.00 Rp. 52,424.40
Tukang L.02 OH 0.100 Rp. 183,834.00 Rp. 18,383.40
Kepala Tukang L.03 OH 0.010 Rp. 199,782.00 Rp. 1,997.82
Mandor L.04 OH 0.015 Rp. 211,379.00 Rp. 3,170.69
Jumlah Tenaga Kerja (A) Rp. 75,976.31
B BAHAN
Batu Bata Buah 70.000 Rp. 500.00 Rp. 35,000.00
Semen @ 40 Kg Kg 11.500 Rp. 1,120.00 Rp. 12,880.00
Pasir Pasang (1400 kg/m3) M3 0.0430 Rp. 221,285.71 Rp. 9,515.29

Jumlah Harga Bahan (B) Rp. 57,395.29


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 133,371.59
E Overhead & Profit 10% x D Rp. 13,337.16
F Harga Satuan Pekerjaan ( D + E ) Rp. 146,708.75
G Dibulatkan Rp. 146,708.75

Analisa : AHSP A.4.4.1.10


Item : Pemasangan dinding bata ringan T = 10 cm
Satuan : m2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.300 Rp. 174,748.00 Rp. 52,424.40
Tukang L.02 OH 0.100 Rp. 183,834.00 Rp. 18,383.40
Kepala Tukang L.03 OH 0.010 Rp. 199,782.00 Rp. 1,997.82
Mandor L.04 OH 0.015 Rp. 211,379.00 Rp. 3,170.69
Jumlah Tenaga Kerja (A) Rp. 75,976.31
B BAHAN
Bata Ringan Tebal 10 cm M2 1.000 Rp. 51,807.23 Rp. 51,807.23
Mortar Utama 380 ( 40 kg ) ZAK 0.104 Rp. 1,475.00 Rp. 153.40

SUDAH GANTI KOEFISIEN TOLONG LIHAT AHSP MASTER

Jumlah Harga Bahan (B) Rp. 51,960.63


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 127,936.93
E Overhead & Profit 10% x D Rp. 12,793.69
F Harga Satuan Pekerjaan ( D + E ) Rp. 140,730.63
G Dibulatkan Rp. 140,730.00

Analisa : AHSP A.0.0.13


Item : Pemasangan dinding bata ringan T = 7.5 cm
Satuan : m2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.500 Rp. 174,748.00 Rp. 87,374.00
Tukang L.02 OH 0.950 Rp. 183,834.00 Rp. 174,642.30
Kepala Tukang L.03 OH 0.095 Rp. 199,782.00 Rp. 18,979.29
Mandor L.04 OH 0.003 Rp. 211,379.00 Rp. 634.14
Jumlah Tenaga Kerja (A) Rp. 281,629.73
B BAHAN
Bata Ringan Tebal 7.5 cm Bh 8.400 Rp. 4,188.03 Rp. 35,179.49
Mortar Perekat kg 0.473 Rp. 1,475.00 Rp. 697.68

Jumlah Harga Bahan (B) Rp. 35,877.16


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 317,506.89
E Overhead & Profit 10% x D Rp. 31,750.69
F Harga Satuan Pekerjaan ( D + E ) Rp. 349,257.58
G Dibulatkan Rp. 349,257.00

Analisa : AHSP A.4.4.1.23


Item : Pemasangan Dinding Terawang (Rooster) 12 x 11 x 24 Campuran 1 SP : 4 PP
Satuan : m2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.300 Rp. 174,748.00 Rp. 52,424.40
Tukang L.02 OH 0.100 Rp. 183,834.00 Rp. 18,383.40
Kepala Tukang L.03 OH 0.010 Rp. 199,782.00 Rp. 1,997.82
Mandor L.04 OH 0.015 Rp. 211,379.00 Rp. 3,170.69
Jumlah Tenaga Kerja (A) Rp. 75,976.31
B BAHAN
Beton Rooster / Kerawang Buah 25.000 Rp. 12,000.00 Rp. 300,000.00
Semen @ 40 Kg Kg 11.000 Rp. 1,450.00 Rp. 15,950.00
Pasir Pasang (1400 kg/m3) M3 0.035 Rp. 217,000.00 Rp. 7,595.00

Jumlah Harga Bahan (B) Rp. 323,545.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 399,521.31
E Overhead & Profit 10% x D Rp. 39,952.13
F Harga Satuan Pekerjaan ( D + E ) Rp. 439,473.44
G Dibulatkan Rp. 439,473.00

Analisa : AHSP A.0.0.14


Item : Pemasangan Plesteran 1 SP : 5 PP Tebal 15 mm
Satuan : m2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.300 Rp. 174,748.00 Rp. 52,424.40
Tukang L.02 OH 0.150 Rp. 183,834.00 Rp. 27,575.10
Kepala Tukang L.03 OH 0.015 Rp. 199,782.00 Rp. 2,996.73
Mandor L.04 OH 0.015 Rp. 211,379.00 Rp. 3,170.69
Jumlah Tenaga Kerja (A) Rp. 86,166.92
B BAHAN
Semen @ 50 Kg Kg 5.184 Rp. 1,399.98 Rp. 7,257.47
Pasir Pasang (1400 kg/m3) M3 0.026 Rp. 221,285.71 Rp. 5,753.43

Jumlah Harga Bahan (B) Rp. 13,010.90


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 99,177.81
E Overhead & Profit 10% x D Rp. 9,917.78
F Harga Satuan Pekerjaan ( D + E ) Rp. 109,095.60
G Dibulatkan Rp. 109,095.60

Analisa : AHSP A.4.4.2.3


Item : Pemasangan Plesteran 1 SP : 3 PP Tebal 15 mm
Satuan : m2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.300 Rp. 174,748.00 Rp. 52,424.40
Tukang L.02 OH 0.150 Rp. 183,834.00 Rp. 27,575.10
Kepala Tukang L.03 OH 0.015 Rp. 199,782.00 Rp. 2,996.73
Mandor L.04 OH 0.015 Rp. 211,379.00 Rp. 3,170.69
Jumlah Tenaga Kerja (A) Rp. 86,166.92
B BAHAN
Semen @ 40 Kg Kg 7.776 Rp. 1,120.00 Rp. 8,709.12
Pasir Pasang (1400 kg/m3) M3 0.023 Rp. 217,000.00 Rp. 4,991.00

Jumlah Harga Bahan (B) Rp. 13,700.12


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 99,867.03
E Overhead & Profit 10% x D Rp. 9,986.70
F Harga Satuan Pekerjaan ( D + E ) Rp. 109,853.74
G Dibulatkan Rp. 109,853.74

Analisa : AHSP A.4.4.2.4


Item : Pemasangan Plesteran 1 SP : 4 PP Tebal 15 mm
Satuan : m2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.300 Rp. 174,748.00 Rp. 52,424.40
Tukang L.02 OH 0.150 Rp. 183,834.00 Rp. 27,575.10
Kepala Tukang L.03 OH 0.015 Rp. 199,782.00 Rp. 2,996.73
Mandor L.04 OH 0.015 Rp. 211,379.00 Rp. 3,170.69
Jumlah Tenaga Kerja (A) Rp. 86,166.92
B BAHAN
Semen @ 40 Kg Kg 6.240 Rp. 1,120.00 Rp. 6,988.80
Pasir Pasang (1400 kg/m3) M3 0.024 Rp. 217,000.00 Rp. 5,208.00

Jumlah Harga Bahan (B) Rp. 12,196.80


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 98,363.71
E Overhead & Profit 10% x D Rp. 9,836.37
F Harga Satuan Pekerjaan ( D + E ) Rp. 108,200.09
G Dibulatkan Rp. 108,200.09

Analisa : AHSP A.4.4.2.14


Item : Pemasangan Plesteran 1 SP : 3 PP Tebal 20 mm
Satuan : m2
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.260 Rp. 174,748.00 Rp. 45,434.48
Tukang L.02 OH 0.200 Rp. 183,834.00 Rp. 36,766.80
Kepala Tukang L.03 OH 0.020 Rp. 199,782.00 Rp. 3,995.64
Mandor L.04 OH 0.013 Rp. 211,379.00 Rp. 2,747.93
Jumlah Tenaga Kerja (A) Rp. 88,944.85
B BAHAN
Semen @ 40 Kg Kg 10.368 Rp. 1,450.00 Rp. 15,033.60
Pasir Pasang (1400 kg/m3) M3 0.031 Rp. 217,000.00 Rp. 6,727.00

Jumlah Harga Bahan (B) Rp. 21,760.60


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 110,705.45
E Overhead & Profit 10% x D Rp. 11,070.54
F Harga Satuan Pekerjaan ( D + E ) Rp. 121,775.99
G Dibulatkan Rp. 121,775.00

Analisa : AHSP A.4.4.2.15


Item : Pemasangan Plesteran 1 SP : 4 PP Tebal 20 mm
Satuan : m2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.300 Rp. 174,748.00 Rp. 52,424.40
Tukang L.02 OH 0.200 Rp. 183,834.00 Rp. 36,766.80
Kepala Tukang L.03 OH 0.020 Rp. 199,782.00 Rp. 3,995.64
Mandor L.04 OH 0.010 Rp. 211,379.00 Rp. 2,113.79
Jumlah Tenaga Kerja (A) Rp. 95,300.63
B BAHAN
Semen @ 40 Kg Kg 7.610 Rp. 1,120.00 Rp. 8,523.20
Pasir Pasang (1400 kg/m3) M3 0.032 Rp. 217,000.00 Rp. 6,944.00

Jumlah Harga Bahan (B) Rp. 15,467.20


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 110,767.83
E Overhead & Profit 10% x D Rp. 11,076.78
F Harga Satuan Pekerjaan ( D + E ) Rp. 121,844.61
G Dibulatkan Rp. 121,844.00

Analisa : AHSP A.4.4.2.15


Item : Pemasangan Plesteran 1 SP : 5 PP Tebal 20 mm
Satuan : m2
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.200 Rp. 174,748.00 Rp. 34,949.60
Tukang L.02 OH 0.200 Rp. 183,834.00 Rp. 36,766.80
Kepala Tukang L.03 OH 0.020 Rp. 199,782.00 Rp. 3,995.64
Mandor L.04 OH 0.010 Rp. 211,379.00 Rp. 2,113.79
Jumlah Tenaga Kerja (A) Rp. 77,825.83
B BAHAN
Semen @ 40 Kg Kg 6.912 Rp. 1,120.00 Rp. 7,741.44
Pasir Pasang (1400 kg/m3) M3 0.035 Rp. 217,000.00 Rp. 7,595.00

Jumlah Harga Bahan (B) Rp. 15,336.44


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 93,162.27
E Overhead & Profit 10% x D Rp. 9,316.23
F Harga Satuan Pekerjaan ( D + E ) Rp. 102,478.50
G Dibulatkan Rp. 102,478.00

Analisa : AHSP A.4.4.2.20


Item : Pemasangan Plesteran Skoning 1 SP : 3 PP Tebal 10 mm
Satuan : m1

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.080 Rp. 174,748.00 Rp. 13,979.84
Tukang L.02 OH 0.400 Rp. 183,834.00 Rp. 73,533.60
Kepala Tukang L.03 OH 0.040 Rp. 199,782.00 Rp. 7,991.28
Mandor L.04 OH 0.004 Rp. 211,379.00 Rp. 845.52
Jumlah Tenaga Kerja (A) Rp. 96,350.24
B BAHAN
Semen @ 40 Kg Kg 0.500 Rp. 1,450.00 Rp. 725.00
Pasir Pasang (1400 kg/m3) M3 0.013 Rp. 217,000.00 Rp. 2,821.00

Jumlah Harga Bahan (B) Rp. 3,546.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 99,896.24
E Overhead & Profit 10% x D Rp. 9,989.62
F Harga Satuan Pekerjaan ( D + E ) Rp. 109,885.86
G Dibulatkan Rp. 109,885.00

Analisa : AHSP A.4.4.2.23


Item : Pemasangan Plesteran Ciprat 1 SP : 2 PP
Satuan : m2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.300 Rp. 174,748.00 Rp. 52,424.40
Tukang L.02 OH 0.100 Rp. 183,834.00 Rp. 18,383.40
Kepala Tukang L.03 OH 0.010 Rp. 199,782.00 Rp. 1,997.82
Mandor L.04 OH 0.015 Rp. 211,379.00 Rp. 3,170.69
Jumlah Tenaga Kerja (A) Rp. 75,976.31
B BAHAN
Semen @ 40 Kg Kg 4.320 Rp. 1,450.00 Rp. 6,264.00
Pasir Pasang Kg 0.006 Rp. 155.00 Rp. 0.93

Jumlah Harga Bahan (B) Rp. 6,264.93


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 82,241.24
E Overhead & Profit 10% x D Rp. 8,224.12
F Harga Satuan Pekerjaan ( D + E ) Rp. 90,465.36
G Dibulatkan Rp. 90,465.36

Analisa : AHSP A.0.0.15


Item : Pemasangan Acian
Satuan : m2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.200 Rp. 174,748.00 Rp. 34,949.60
Tukang L.02 OH 0.100 Rp. 183,834.00 Rp. 18,383.40
Kepala Tukang L.03 OH 0.010 Rp. 199,782.00 Rp. 1,997.82
Mandor L.04 OH 0.010 Rp. 211,379.00 Rp. 2,113.79
Jumlah Tenaga Kerja (A) Rp. 57,444.61
B BAHAN
Semen @50 kg Kg 3.250 Rp. 1,120.00 Rp. 3,640.00

Jumlah Harga Bahan (B) Rp. 3,640.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 61,084.61
E Overhead & Profit 10% x D Rp. 6,108.46
F Harga Satuan Pekerjaan ( D + E ) Rp. 67,193.07
G Dibulatkan Rp. 67,193.07

Analisa : AHSP A.4.4.2.28


Item : Pemasangan Plesteran Dengan Mortar Siap Pakai (MSP)
Satuan : m2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.300 Rp. 174,748.00 Rp. 52,424.40
Tukang L.02 OH 0.150 Rp. 183,834.00 Rp. 27,575.10
Kepala Tukang L.03 OH 0.015 Rp. 199,782.00 Rp. 2,996.73
Mandor L.04 OH 0.015 Rp. 211,379.00 Rp. 3,170.69
Jumlah Tenaga Kerja (A) Rp. 86,166.92
B BAHAN
Mortar Siap Pakai (MSP) Kg 6.240 Rp. 6,000.00 Rp. 37,440.00
Jumlah Harga Bahan (B) Rp. 37,440.00
C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 123,606.92
E Overhead & Profit 10% x D Rp. 12,360.69
F Harga Satuan Pekerjaan ( D + E ) Rp. 135,967.61
G Dibulatkan Rp. 135,967.00

Analisa : AHSP A.4.4.2.29


Item : Pemasangan Plesteran Acian Mortar Siap Pakai (MSP)
Satuan : m2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.200 Rp. 174,748.00 Rp. 34,949.60
Tukang L.02 OH 0.100 Rp. 183,834.00 Rp. 18,383.40
Kepala Tukang L.03 OH 0.010 Rp. 199,782.00 Rp. 1,997.82
Mandor L.04 OH 0.010 Rp. 211,379.00 Rp. 2,113.79
Jumlah Tenaga Kerja (A) Rp. 57,444.61
B BAHAN
Mortar Siap Pakai (MSP) Kg 3.250 Rp. 3,200.00 Rp. 10,400.00

Jumlah Harga Bahan (B) Rp. 10,400.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 67,844.61
E Overhead & Profit 10% x D Rp. 6,784.46
F Harga Satuan Pekerjaan ( D + E ) Rp. 74,629.07
G Dibulatkan Rp. 74,629.00

Analisa : AHSP A.0.0.16


Item : Pemasangan Lantai Ubin Granit Ukuran 30 cm x 30 cm
Satuan : m2

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.600 Rp. 174,748.00 Rp. 104,848.80
Tukang Batu L.02 OH 0.130 Rp. 183,834.00 Rp. 23,898.42
Kepala Tukang L.03 OH 0.013 Rp. 199,782.00 Rp. 2,597.17
Mandor L.04 OH 0.013 Rp. 211,379.00 Rp. 2,747.93
Jumlah Tenaga Kerja (A) Rp. 134,092.31
B BAHAN
Granit Uk 30 x 30 m2 1.068 Rp. 230,000.00 Rp. 245,709.00
Semen @ 40 Kg zak 0.250 Rp. 69,998.75 Rp. 17,499.69
Semen Warna @ 50 Kg kg 1.500 Rp. 11,800.00 Rp. 17,700.00
Pasir Pasang (1400 kg/m3) m3 0.045 Rp. 221,285.71 Rp. 9,957.86

Jumlah Harga Bahan (B) Rp. 290,866.54


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 424,958.86
E Overhead & Profit 10% x D Rp. 42,495.89
F Harga Satuan Pekerjaan ( D + E ) Rp. 467,454.74
G Dibulatkan Rp. 467,454.74

Analisa : AHSP A.0.0.16


Item : Pemasangan Lantai Ubin Granit Ukuran 40 cm x 40 cm
Satuan : m2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.250 Rp. 174,748.00 Rp. 43,687.00
Tukang Batu L.02 OH 0.125 Rp. 183,834.00 Rp. 22,979.25
Kepala Tukang L.03 OH 0.013 Rp. 199,782.00 Rp. 2,597.17
Mandor L.04 OH 0.013 Rp. 211,379.00 Rp. 2,747.93
Jumlah Tenaga Kerja (A) Rp. 72,011.34
B BAHAN
Granit Uk 40 x 40 M2 6.630 Rp. 56,000.00 Rp. 371,280.00
Semen @ 40 Kg Kg 9.800 Rp. 1,399.98 Rp. 13,719.76
Semen Warna @ 50 Kg Kg 1.300 Rp. 11,800.00 Rp. 15,340.00
Pasir Pasang (1400 kg/m3) M3 0.045 Rp. 221,285.71 Rp. 9,957.86

Jumlah Harga Bahan (B) Rp. 410,297.61


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 482,308.96
E Overhead & Profit 10% x D Rp. 48,230.90
F Harga Satuan Pekerjaan ( D + E ) Rp. 530,539.85
G Dibulatkan Rp. 530,539.85

Analisa : AHSP A.0.0.16


Item : Pemasangan Lantai Ubin Granit Ukuran 60 cm x 60 cm
Satuan : m2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.150 Rp. 174,748.00 Rp. 26,212.20
Tukang Batu L.02 OH 0.120 Rp. 183,834.00 Rp. 22,060.08
Kepala Tukang L.03 OH 0.012 Rp. 199,782.00 Rp. 2,397.38
Mandor L.04 OH 0.012 Rp. 211,379.00 Rp. 2,536.55
Jumlah Tenaga Kerja (A) Rp. 53,206.21
B BAHAN
Granit Uk 60 x 60 bh 3.100 Rp. 67,000.00 Rp. 207,700.00
Semen @ 40 Kg kg 9.600 Rp. 1,399.98 Rp. 13,439.76
Semen Warna @ 50 Kg Kg 1.500 Rp. 11,800.00 Rp. 17,700.00
Pasir Pasang (1400 kg/m3) M3 0.045 Rp. 221,285.71 Rp. 9,957.86
Jumlah Harga Bahan (B) Rp. 248,797.62
C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 302,003.83
E Overhead & Profit 10% x D Rp. 30,200.38
F Harga Satuan Pekerjaan ( D + E ) Rp. 332,204.21
G Dibulatkan Rp. 332,204.21

Analisa : AHSP A.0.0.17


Item : Pemasangan Lantai Ubin Keramik Ukuran 40 cm x 40 cm
Satuan : m2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.700 Rp. 174,748.00 Rp. 122,323.60
Tukang Batu L.02 OH 0.350 Rp. 183,834.00 Rp. 64,341.90
Kepala Tukang L.03 OH 0.035 Rp. 199,782.00 Rp. 6,992.37
Mandor L.04 OH 0.035 Rp. 211,379.00 Rp. 7,398.27
Jumlah Tenaga Kerja (A) Rp. 201,056.14
B BAHAN
Keramik uk 40x40 Doos 1.050 Rp. 65,000.00 Rp. 68,250.00
Semen @ 50 Kg Kg 9.800 Rp. 1,399.98 Rp. 13,719.76
Semen Warna @ 50 Kg Kg 1.300 Rp. 11,800.00 Rp. 15,340.00
Pasir Pasang (1400 kg/m3) M3 0.045 Rp. 221,285.71 Rp. 9,957.86

Jumlah Harga Bahan (B) Rp. 107,267.61


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 308,323.75
E Overhead & Profit 10% x D Rp. 30,832.37
F Harga Satuan Pekerjaan ( D + E ) Rp. 339,156.12
G Dibulatkan Rp. 339,156.12

Analisa : AHSP A.4.4.3.13


Item : Pemasangan Lantai Ubin Teralux Marmer Ukuran 60 cm x 60 cm Polished
Satuan : m2

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.240 Rp. 174,748.00 Rp. 41,939.52
Tukang Batu L.02 OH 0.120 Rp. 183,834.00 Rp. 22,060.08

Kepala Tukang L.03 OH 0.012 Rp. 199,782.00 Rp. 2,397.38

Mandor L.04 OH 0.012 Rp. 211,379.00 Rp. 2,536.55


Jumlah Tenaga Kerja (A) Rp. 68,933.53
B BAHAN
Granit Uk. 60 x 60 cm Polished Bh 3.100 Rp. 52,000.00 Rp. 161,200.00
Semen @ 40 Kg Kg 9.600 Rp. 1,450.00 Rp. 13,920.00
Semen Warna @ 50 Kg Kg 1.500 Rp. 11,800.00 Rp. 17,700.00
Pasir Pasang (1400 kg/m3) M3 0.045 Rp. 217,000.00 Rp. 9,765.00

Jumlah Harga Bahan (B) Rp. 202,585.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 271,518.53
E Overhead & Profit 10% x D Rp. 27,151.85
F Harga Satuan Pekerjaan ( D + E ) Rp. 298,670.39
G Dibulatkan Rp. 298,670.00

Analisa : AHSP A.4.4.3.13.a


Item : Pemasangan Lantai Ubin Teralux Marmer Ukuran 60 cm x 60 cm Unpolished
Satuan : m2

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.240 Rp. 174,748.00 Rp. 41,939.52
Tukang Batu L.02 OH 0.120 Rp. 183,834.00 Rp. 22,060.08
Kepala Tukang L.03 OH 0.012 Rp. 199,782.00 Rp. 2,397.38
Mandor L.04 OH 0.012 Rp. 211,379.00 Rp. 2,536.55
Jumlah Tenaga Kerja (A) Rp. 68,933.53

B BAHAN

Granit Uk. 60 x 60 cm Unpolished Bh 3.100 Rp. 52,000.00 Rp. 161,200.00


Semen @ 40 Kg Kg 9.600 Rp. 1,450.00 Rp. 13,920.00
Semen Warna @ 50 Kg Kg 1.500 Rp. 11,800.00 Rp. 17,700.00
Pasir Pasang (1400 kg/m3) M3 0.068 Rp. 217,000.00 Rp. 14,756.00

Jumlah Harga Bahan (B) Rp. 207,576.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 276,509.53
E Overhead & Profit 10% x D Rp. 27,650.95
F Harga Satuan Pekerjaan ( D + E ) Rp. 304,160.49
G Dibulatkan Rp. 304,160.00

Analisa : AHSP A.4.4.3.28


Item : Pemasangan Plint Ubin Teralux Marmer Ukuran 10 cm x 60 cm
Satuan : m1

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.090 Rp. 174,748.00 Rp. 15,727.32
Tukang Batu L.02 OH 0.090 Rp. 183,834.00 Rp. 16,545.06
Kepala Tukang L.03 OH 0.009 Rp. 199,782.00 Rp. 1,798.04

Mandor L.04 OH 0.005 Rp. 211,379.00 Rp. 951.21


Jumlah Tenaga Kerja (A) Rp. 35,021.62
B BAHAN
Plint Keramik Granit 10 x 60 Bh 1.700 Rp. 17,500.00 Rp. 29,750.00
Semen @ 40 Kg Kg 1.140 Rp. 1,399.98 Rp. 1,595.97
Semen @ 50 Kg Kg 0.100 Rp. 11,800.00 Rp. 1,180.00
Pasir Pasang (1400 kg/m3) M3 0.003 Rp. 217,000.00 Rp. 651.00

Jumlah Harga Bahan (B) Rp. 33,176.97


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 68,198.60
E Overhead & Profit 10% x D Rp. 6,819.86
F Harga Satuan Pekerjaan ( D + E ) Rp. 75,018.45
G Dibulatkan Rp. 75,018.00

Analisa : AHSP A.4.4.3.28


Item : Pemasangan Plint PVC
Satuan : m1

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.090 Rp. 174,748.00 Rp. 15,727.32
Tukang Kayu L.02 OH 0.090 Rp. 183,834.00 Rp. 16,545.06

Kepala Tukang L.03 OH 0.009 Rp. 199,782.00 Rp. 1,798.04

Mandor L.04 OH 0.005 Rp. 211,379.00 Rp. 951.21


Jumlah Tenaga Kerja (A) Rp. 35,021.62
B BAHAN
Plint PVC btg 0.550 Rp. 197,400.00 Rp. 108,570.00
Lem PVC bh 0.350 Rp. 85,000.00 Rp. 29,750.00

Jumlah Harga Bahan (B) Rp. 138,320.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 173,341.62
E Overhead & Profit 0% x D Rp -
F Harga Satuan Pekerjaan ( D + E ) Rp. 173,341.62
G Dibulatkan Rp. 173,341.00

Analisa : AHSP A.4.4.3.29


Item : Pemasangan Plint Ubin Teralux Marmer Ukuran 10 cm x 40 cm
Satuan : m1

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.090 Rp. 174,748.00 Rp. 15,727.32
Tukang Batu L.02 OH 0.090 Rp. 183,834.00 Rp. 16,545.06
Kepala Tukang L.03 OH 0.009 Rp. 199,782.00 Rp. 1,798.04
Mandor L.04 OH 0.005 Rp. 211,379.00 Rp. 951.21

Jumlah Tenaga Kerja (A) Rp. 35,021.62

B BAHAN
Plint Keramik Granit 10 x 40 Bh 2.630 Rp. 8,600.00 Rp. 22,618.00
Semen @ 40 Kg Kg 1.140 Rp. 1,450.00 Rp. 1,653.00
Semen @ 50 Kg Kg 0.100 Rp. 3,000.00 Rp. 300.00
Pasir Pasang (1400 kg/m3) M3 0.003 Rp. 217,000.00 Rp. 651.00

Jumlah Harga Bahan (B) Rp. 25,222.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 60,243.62
E Overhead & Profit 10% x D Rp. 6,024.36
F Harga Satuan Pekerjaan ( D + E ) Rp. 66,267.99
G Dibulatkan Rp. 66,267.00

Analisa : AHSP A.4.4.3.54


Item : Pemasangan 1 m2 Dinding Keramik 20 cm x 40 cm
Satuan : m2

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.900 Rp. 174,748.00 Rp. 157,273.20
Tukang Batu L.02 OH 0.450 Rp. 183,834.00 Rp. 82,725.30

Kepala Tukang L.03 OH 0.045 Rp. 199,782.00 Rp. 8,990.19

Mandor L.04 OH 0.045 Rp. 211,379.00 Rp. 9,512.06


Jumlah Tenaga Kerja (A) Rp. 258,500.75
B BAHAN
Keramik 20 x 40 cm bh 13.000 Rp. 7,916.67 Rp. 102,916.67
Semen @ 40 Kg zak 0.233 Rp. 46,750.00 Rp. 10,869.38
semen warna kg 1.940 Rp. 11,800.00 Rp. 22,892.00
Pasir Pasang (1400 kg/m3) m3 0.018 Rp. 221,285.71 Rp. 3,983.14

Jumlah Harga Bahan (B) Rp. 140,661.18


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 399,161.93
E Overhead & Profit 10% x D Rp. 39,916.19
F Harga Satuan Pekerjaan ( D + E ) Rp. 439,078.12
G Dibulatkan Rp. 439,078.00

Analisa : AHSP A.4.4.3.54.a


Item : Pemasangan 1 m2 Dinding Keramik 30 cm x 60 cm
Satuan : m2
Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.350 Rp. 174,748.00 Rp. 61,161.80
Tukang Batu L.02 OH 0.450 Rp. 183,834.00 Rp. 82,725.30
Kepala Tukang L.03 OH 0.045 Rp. 199,782.00 Rp. 8,990.19
Mandor L.04 OH 0.017 Rp. 211,379.00 Rp. 3,699.13

Jumlah Tenaga Kerja (A) Rp. 156,576.42

B BAHAN
Keramik 30 x 60 cm bh 5.555 Rp. 28,940.00 Rp. 160,761.70
Semen @ 40 Kg Kg 10.000 Rp. 1,120.00 Rp. 11,200.00
Pasir Pasang (1400 kg/m3) M3 0.045 Rp. 217,000.00 Rp. 9,765.00
Semen Warna kg 1.500 Rp. 11,800.00 Rp. 17,700.00

Jumlah Harga Bahan (B) Rp. 199,426.70


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 356,003.12
E Overhead & Profit 10% x D Rp. 35,600.31
F Harga Satuan Pekerjaan ( D + E ) Rp. 391,603.43
G Dibulatkan Rp. 391,603.00

Analisa : AHSP A.4.4.3.54.b


Item : Pemasangan 1 m2 Dinding Granit 60 cm x 120 cm
Satuan : m2

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.900 Rp. 174,748.00 Rp. 157,273.20
Tukang Batu L.02 OH 0.450 Rp. 183,834.00 Rp. 82,725.30
Kepala Tukang L.03 OH 0.045 Rp. 199,782.00 Rp. 8,990.19
Mandor L.04 OH 0.045 Rp. 211,379.00 Rp. 9,512.06
Jumlah Tenaga Kerja (A) Rp. 258,500.75

B BAHAN

Granit Uk. 60 x 120 cm bh 1.400 Rp. 380,000.00 Rp. 532,000.00


Semen @ 40 Kg Kg 9.300 Rp. 1,450.00 Rp. 13,485.00
Semen @ 50 Kg Kg 1.940 Rp. 3,000.00 Rp. 5,820.00
Pasir Pasang (1400 kg/m3) M3 0.018 Rp. 217,000.00 Rp. 3,906.00

Jumlah Harga Bahan (B) Rp. 555,211.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 813,711.75
E Overhead & Profit 10% x D Rp. 81,371.17
F Harga Satuan Pekerjaan ( D + E ) Rp. 895,082.92
G Dibulatkan Rp. 895,082.00

AHSP A.4.5.1. HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)


Analisa : AHSP A.4.5.1.7
Item : Pemasangan 1 m2 Langit-Langit Gypsum Board Ukuran ( 120 x 240 x 9 ) mm, Tebal 9 mm
Satuan : m2

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.100 Rp. 174,748.00 Rp. 17,474.80
Tukang Kayu L.02 OH 0.050 Rp. 183,834.00 Rp. 9,191.70

Kepala Tukang L.03 OH 0.007 Rp. 199,782.00 Rp. 1,398.47

Mandor L.04 OH 0.005 Rp. 211,379.00 Rp. 1,056.90


Jumlah Tenaga Kerja (A) Rp. 29,121.87
B BAHAN
Gypsum ( 120 x 240 cm ) Lembar 0.364 Rp. 46,000.00 Rp. 16,744.00
Paku skrup 10 cm Kg 0.110 Rp. 42,500.00 Rp. 4,675.00

Jumlah Harga Bahan (B) Rp. 21,419.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 50,540.87
E Overhead & Profit 10% x D Rp. 5,054.09
F Harga Satuan Pekerjaan ( D + E ) Rp. 55,594.96
G Dibulatkan Rp. 55,594.00

Analisa : AHSP A.4.5.1.7


Item : Pemasangan 1 m2 Langit-Langit Grc Board Ukuran ( 120 x 240 x 9 ) mm, Tebal 9 mm
Satuan : m2

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.100 Rp. 174,748.00
Tukang Kayu L.02 OH 0.050 Rp. 183,834.00
Kepala Tukang L.03 OH 0.005 Rp. 199,782.00
Mandor L.04 OH 0.005 Rp. 211,379.00
Jumlah Tenaga Kerja (A) Rp -
B BAHAN
GRC 9mm Lembar 0.364 Rp. 147,000.00 Rp. 53,508.00
Paku Skrup kg 0.110 Rp. 42,500.00 Rp. 4,675.00

Jumlah Harga Bahan (B) Rp. 58,183.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 58,183.00
E Overhead & Profit 10% x D Rp. 5,818.30
F Harga Satuan Pekerjaan ( D + E ) Rp. 64,001.30
G Dibulatkan Rp. 64,001.00
Analisa : AHSP A.4.5.1.10
Item : Pemasangan 1 m2 Rangka Langit-Langit Besi Hollow 40.40 untuk plafon
Satuan : m2

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.350 Rp. 174,748.00 Rp. 61,161.80
Tukang Kayu L.02 OH 0.350 Rp. 183,834.00 Rp. 64,341.90
Kepala Tukang L.03 OH 0.035 Rp. 199,782.00 Rp. 6,992.37
Mandor L.04 OH 0.017 Rp. 211,379.00 Rp. 3,699.13
Jumlah Tenaga Kerja (A) Rp. 136,195.20

B BAHAN

Besi hollow 40x40 m1 4.500 Rp. 5,500.00 Rp. 24,750.00


Assesories ( Perkuatan, Las dll ) ls 100% x Rangka Rp. 5,500.00 Rp. 5,500.00

Jumlah Harga Bahan (B) Rp. 30,250.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 166,445.20
E Overhead & Profit 10% x D Rp. 16,644.52
F Harga Satuan Pekerjaan ( D + E ) Rp. 183,089.72
G Dibulatkan Rp. 183,089.00

AHSP A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP

Analisa : AHSP A.4.5.2.7


Item : Pemasangan 1 m2 Roof Light Fibreglass 90 x 180 cm
Satuan : m2

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.140 Rp. 174,748.00 Rp. 24,464.72
Tukang Kayu L.02 OH 0.067 Rp. 183,834.00 Rp. 12,316.88

Kepala Tukang L.03 OH 0.007 Rp. 199,782.00 Rp. 1,338.54

Mandor L.04 OH 0.007 Rp. 211,379.00 Rp. 1,479.65


Jumlah Tenaga Kerja (A) Rp. 39,599.79
B BAHAN
Roof Light Fibreglass 90 x 180 cm Lbr 0.600 Rp. 260,000.00 Rp. 156,000.00
Paku Biasa 1/2" - 1" Kg 0.050 Rp. 20,000.00 Rp. 1,000.00

Jumlah Harga Bahan (B) Rp. 157,000.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 196,599.79
E Overhead & Profit 10% x D Rp. 19,659.98
F Harga Satuan Pekerjaan ( D + E ) Rp. 216,259.77
G Dibulatkan Rp. 216,259.00

Analisa : AHSP A.4.5.2.34


Item : Pemasangan 1 m2 Atap Sirap Kayu
Satuan : m2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.166 Rp. 174,748.00 Rp. 29,008.17
Tukang Kayu L.02 OH 0.250 Rp. 183,834.00 Rp. 45,958.50
Kepala Tukang L.03 OH 0.025 Rp. 199,782.00 Rp. 4,994.55
Mandor L.04 OH 0.008 Rp. 211,379.00 Rp. 1,754.45
Jumlah Tenaga Kerja (A) Rp. 81,715.66
B BAHAN
Sirap Kayu Bh 7.000 Rp. 19,285.71 Rp. 135,000.00
Paku Biasa 1/2" - 1" Kg 0.200 Rp. 13,500.00 Rp. 2,700.00

Jumlah Harga Bahan (B) Rp. 137,700.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 219,415.66
E Overhead & Profit 10% x D Rp. 21,941.57
F Harga Satuan Pekerjaan ( D + E ) Rp. 241,357.23
G Dibulatkan Rp. 241,357.00

Analisa : AHSP A.4.5.2.41.a


Item : Pemasangan 1 m2 Atap Aspal Bitumen
Satuan : m2

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.150 Rp. 174,748.00 Rp. 26,212.20
Tukang Kayu L.02 OH 0.750 Rp. 183,834.00 Rp. 137,875.50
Kepala Tukang L.03 OH 0.075 Rp. 199,782.00 Rp. 14,983.65

Mandor L.04 OH 0.006 Rp. 211,379.00 Rp. 1,268.27

Jumlah Tenaga Kerja (A) Rp. 180,339.62


B BAHAN
Atap Bitumen Onduvila Lbr 3.240 Rp. 57,400.00 Rp. 185,976.00
Paku Hak Panjang 15 cm Kg 0.020 Rp. 120,000.00 Rp. 2,400.00

Jumlah Harga Bahan (B) Rp. 188,376.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 368,715.62
E Overhead & Profit 10% x D Rp. 36,871.56
F Harga Satuan Pekerjaan ( D + E ) Rp. 405,587.19
G Dibulatkan Rp. 405,587.00

Analisa : AHSP A.4.5.2.42.a


Item : Pemasangan 1 m' Nok Atap Aspal Bitumen
Satuan : m1

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.100 Rp. 174,748.00 Rp. 17,474.80
Tukang Kayu L.02 OH 1.000 Rp. 183,834.00 Rp. 183,834.00

Kepala Tukang L.03 OH 0.100 Rp. 199,782.00 Rp. 19,978.20

Mandor L.04 OH 0.050 Rp. 211,379.00 Rp. 10,568.95


Jumlah Tenaga Kerja (A) Rp. 231,855.95
B BAHAN
Bubungan Atap Aspal Bitumen Lbr 1.200 Rp. 51,950.00 Rp. 62,340.00
Paku Hak Panjang 15 cm Kg 0.040 Rp. 120,000.00 Rp. 4,800.00

Jumlah Harga Bahan (B) Rp. 67,140.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 298,995.95
E Overhead & Profit 10% x D Rp. 29,899.60
F Harga Satuan Pekerjaan ( D + E ) Rp. 328,895.55
G Dibulatkan Rp. 328,895.00

A.4.6.1. HARGA SATUAN PEKERJAAN KAYU

A.4.6.1.1 Pembuatan dan Pemasangan 1 m3 Kusen Pintu dan Kusen Jendela, Kayu Kelas I
Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 7.000 Rp. 174,748.00 Rp. 1,223,236.00
Tukang Kayu L.02 OH 21.000 Rp. 183,834.00 Rp. 3,860,514.00
Kepala Tukang L.03 OH 2.100 Rp. 199,782.00 Rp. 419,542.20
Mandor L.04 OH 0.350 Rp. 211,379.00 Rp. 73,982.65
Jumlah Tenaga Kerja (A) Rp. 5,577,274.85
B BAHAN
Kayu Kelas I (Seumantok/Ulin/dll) M3 1.100 Rp. 6,765,000.00 Rp. 7,441,500.00
Paku Biasa 5 cm - 10 cm Kg 1.250 Rp. 20,000.00 Rp. 25,000.00
#NAME? #NAME? 1.000 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN
Jumlah Harga Alat (C) Rp -
D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

A.4.6.1.2 Pembuatan dan Pemasangan 1 m3 Kusen Pintu dan Kusen Jendela, Kayu Kelas II Ataun III
Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 6.000 Rp. 174,748.00 Rp. 1,048,488.00
Tukang Kayu L.02 OH 16.000 Rp. 183,834.00 Rp. 2,941,344.00
Kepala Tukang L.03 OH 1.600 Rp. 199,782.00 Rp. 319,651.20
Mandor L.04 OH 0.300 Rp. 211,379.00 Rp. 63,413.70
Jumlah Tenaga Kerja (A) Rp. 4,372,896.90
B BAHAN
Kayu Kelas II (Kamper/Kruing/dll) M3 1.100 Rp. 5,500,000.00 Rp. 6,050,000.00
Paku Biasa 5 cm - 10 cm Kg 1.250 Rp. 20,000.00 Rp. 25,000.00
#NAME? #NAME? 1.000 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

A.4.6.1.5 Pembuatan dan Pemasangan 1 m2 Daun Pintu Panel, Kayu Kelas I atau II
Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.000 Rp. 174,748.00 Rp. 174,748.00
Tukang Kayu L.02 OH 3.000 Rp. 183,834.00 Rp. 551,502.00
Kepala Tukang L.03 OH 0.300 Rp. 199,782.00 Rp. 59,934.60
Mandor L.04 OH 0.050 Rp. 211,379.00 Rp. 10,568.95
Jumlah Tenaga Kerja (A) Rp. 796,753.55
B BAHAN
Papan Kayu Kelas I m3 0.040 Rp. 13,450,000.00 Rp. 538,000.00
Lem Kayu kg 0.500 Rp. 51,200.00 Rp. 25,600.00

Jumlah Harga Bahan (B) Rp. 563,600.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 1,360,353.55
E Overhead & Profit 10% x D Rp. 136,035.35
F Harga Satuan Pekerjaan ( D + E ) Rp. 1,496,388.90
G Dibulatkan Rp. 1,496,380.00

A.4.6.1.6 Pembuatan dan Pemasangan 1 m2 Pintu dan Jendela Kaca, Kayu Kelas I atau II
Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.800 Rp. 174,748.00 Rp. 139,798.40
Tukang Kayu L.02 OH 2.400 Rp. 183,834.00 Rp. 441,201.60
Kepala Tukang L.03 OH 0.240 Rp. 199,782.00 Rp. 47,947.68
Mandor L.04 OH 0.040 Rp. 211,379.00 Rp. 8,455.16
Jumlah Tenaga Kerja (A) Rp. 637,402.84
B BAHAN
Papan Kayu Kelas II m3 0.024 Rp. 5,500,000.00 Rp. 132,000.00
Lem Kayu #N/A 0.300 #N/A #N/A

Jumlah Harga Bahan (B) #N/A


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #N/A
E Overhead & Profit 10% x D #N/A
F Harga Satuan Pekerjaan ( D + E ) #N/A
G Dibulatkan #N/A

A.4.6.1.7 Pembuatan dan Pemasangan 1 m2 Pintu dan Jendela Jalusi, Kayu Kelas I atau II
Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.000 Rp. 174,748.00 Rp. 174,748.00
Tukang Kayu L.02 OH 3.000 Rp. 183,834.00 Rp. 551,502.00
Kepala Tukang L.03 OH 0.300 Rp. 199,782.00 Rp. 59,934.60
Mandor L.04 OH 0.050 Rp. 211,379.00 Rp. 10,568.95
Jumlah Tenaga Kerja (A) Rp. 796,753.55
B BAHAN
Papan Kayu Kelas II m3 0.064 Rp. 5,500,000.00 Rp. 352,000.00
Lem Kayu #N/A 0.500 #N/A #N/A

Jumlah Harga Bahan (B) #N/A


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #N/A
E Overhead & Profit 10% x D #N/A
F Harga Satuan Pekerjaan ( D + E ) #N/A
G Dibulatkan #N/A

A.4.6.1.8 Pembuatan 1 m2 Daun Pintu Plywood Rangkap, Rangka Kayu Kelas II Tertutup (Lebar Sampai 90 cm)
Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.700 Rp. 174,748.00 Rp. 122,323.60
Tukang Kayu L.02 OH 2.100 Rp. 183,834.00 Rp. 386,051.40
Kepala Tukang L.03 OH 0.210 Rp. 199,782.00 Rp. 41,954.22
Mandor L.04 OH 0.035 Rp. 211,379.00 Rp. 7,398.26
Jumlah Tenaga Kerja (A) Rp. 557,727.49
B BAHAN
Papan Kayu Kelas II m3 0.025 Rp. 5,500,000.00 Rp. 137,500.00
Paku Kayu Kg 0.030 Rp. 20,000.00 Rp. 600.00
Lem Kayu #N/A 0.500 #N/A #N/A
Plywood 4 mm ( Ukuran 90 x 220 cm ) Lembar 1.000 Rp. 78,000.00 Rp. 78,000.00

Jumlah Harga Bahan (B) #N/A


C PERALATAN
Jumlah Harga Alat (C) Rp -
D Jumlah ( A + B + C ) #N/A
E Overhead & Profit 10% x D #N/A
F Harga Satuan Pekerjaan ( D + E ) #N/A
G Dibulatkan #N/A

A.4.6.1.9 Pembuatan 1 m2 Daun Pintu Plywood Rangkap, Rangka Expose Kayu Kelas I atau II
Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.800 Rp. 174,748.00 Rp. 139,798.40
Tukang Kayu L.02 OH 2.400 Rp. 183,834.00 Rp. 441,201.60
Kepala Tukang L.03 OH 0.240 Rp. 199,782.00 Rp. 47,947.68
Mandor L.04 OH 0.040 Rp. 211,379.00 Rp. 8,455.16
Jumlah Tenaga Kerja (A) Rp. 637,402.84
B BAHAN
Papan Kayu Kelas II m3 0.0256 Rp. 5,500,000.00 Rp. 140,800.00
Paku Kayu Kg 0.030 Rp. 20,000.00 Rp. 600.00
Lem Kayu #N/A 0.500 #N/A #N/A
Plywood 4 mm ( Ukuran 90 x 220 cm ) Lembar 1.000 Rp. 78,000.00 Rp. 78,000.00

Jumlah Harga Bahan (B) #N/A


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #N/A
E Overhead & Profit 10% x D #N/A
F Harga Satuan Pekerjaan ( D + E ) #N/A
G Dibulatkan #N/A

A.4.6.1.10 Pemasangan 1 m Jalusi Kusen, Kayu Kelas I atau II


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.043 Rp. 174,748.00 Rp. 7,514.16
Tukang almuminium #N/A #N/A 0.043 Rp. 183,834.00 Rp. 7,904.86
Kepala Tukang L.03 OH 0.004 Rp. 199,782.00 Rp. 859.06
Mandor L.04 OH 0.021 Rp. 211,379.00 Rp. 4,438.96
Jumlah Tenaga Kerja (A) Rp. 20,717.05
B BAHAN
Jalusi 4" m1 1.100 Rp. 42,650.00 Rp. 46,915.00
Pakuu Skrup bh 2.000 Rp. 360.00 Rp. 720.00
Sealant kg 0.060 Rp. 56,250.00 Rp. 3,375.00

Jumlah Harga Bahan (B) Rp. 51,010.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 71,727.05
E Overhead & Profit 10% x D Rp. 7,172.70
F Harga Satuan Pekerjaan ( D + E ) Rp. 78,899.75
G Dibulatkan Rp. 78,890.00

A.4.6.1.13 Pemasangan 1 m3 Konstruksi Kuda-Kuda Konvensional, Kayu Kelas I, II dan III Bentang 6 meter
Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 4.000 Rp. 174,748.00 Rp. 698,992.00
Tukang Kayu L.02 OH 12.000 Rp. 183,834.00 Rp. 2,206,008.00
Kepala Tukang L.03 OH 1.200 Rp. 199,782.00 Rp. 239,738.40
Mandor L.04 OH 0.200 Rp. 211,379.00 Rp. 42,275.80
Jumlah Tenaga Kerja (A) Rp. 3,187,014.20
B BAHAN
Kayu Kelas I (Seumantok/Ulin/dll) M3 1.100 Rp. 6,765,000.00 Rp. 7,441,500.00
#NAME? #NAME? 15.000 #NAME? #NAME?
Paku Biasa 5 cm - 10 cm Kg 5.600 Rp. 20,000.00 Rp. 112,000.00

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

A.4.6.1.14 Pemasangan 1 m3 Konstruksi Kuda-Kuda Expose, Kayu Kelas I


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 6.700 Rp. 174,748.00 Rp. 1,170,811.60
Tukang Kayu L.02 OH 20.100 Rp. 183,834.00 Rp. 3,695,063.40
Kepala Tukang L.03 OH 2.010 Rp. 199,782.00 Rp. 401,561.82
Mandor L.04 OH 0.335 Rp. 211,379.00 Rp. 70,811.97
Jumlah Tenaga Kerja (A) Rp. 5,338,248.79
B BAHAN
Kayu Kelas I (Seumantok/Ulin/dll) M3 1.200 Rp. 6,765,000.00 Rp. 8,118,000.00
#NAME? #NAME? 15.000 #NAME? #NAME?
Paku Biasa 5 cm - 10 cm Kg 5.600 Rp. 20,000.00 Rp. 112,000.00

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

A.4.6.1.15 Pemasangan 1 m3 Konstruksi Gordeng, Kayu Kelas II


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 6.700 Rp. 174,748.00 Rp. 1,170,811.60
Tukang Kayu L.02 OH 20.100 Rp. 183,834.00 Rp. 3,695,063.40
Kepala Tukang L.03 OH 2.010 Rp. 199,782.00 Rp. 401,561.82
Mandor L.04 OH 0.335 Rp. 211,379.00 Rp. 70,811.97
Jumlah Tenaga Kerja (A) Rp. 5,338,248.79
B BAHAN
Kayu Kelas II (Kamper/Kruing/dll) M3 1.100 Rp. 5,500,000.00 Rp. 6,050,000.00
#NAME? #NAME? 15.000 #NAME? #NAME?
Paku Biasa 5 cm - 10 cm Kg 3.000 Rp. 20,000.00 Rp. 60,000.00
Jumlah Harga Bahan (B) #NAME?
C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

A.4.6.1.18 Pemasangan 1 m2 Rangka Atap Sirap, Kayu Kelas II


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.120 Rp. 174,748.00 Rp. 20,969.76
Tukang Kayu L.02 OH 0.120 Rp. 183,834.00 Rp. 22,060.08
Kepala Tukang L.03 OH 0.012 Rp. 199,782.00 Rp. 2,397.38
Mandor L.04 OH 0.006 Rp. 211,379.00 Rp. 1,268.27
Jumlah Tenaga Kerja (A) Rp. 46,695.50
B BAHAN
Baja Ringan Canai Dingin C75 btg 0.830 Rp. 125,000.00 Rp. 103,750.00

Jumlah Harga Bahan (B) Rp. 103,750.00


C PERALATAN
accessories % 10.000 Rp. 103,750.00 Rp. 10,375.00

Jumlah Harga Alat (C) Rp. 10,375.00


D Jumlah ( A + B + C ) Rp. 160,820.50
E Overhead & Profit 10% x D Rp. 16,082.05
F Harga Satuan Pekerjaan ( D + E ) Rp. 176,902.55
G Dibulatkan Rp. 176,900.00

A.4.6.1.19 Pemasangan 1 m2 Rangka Langit-Langit (50 x 100) cm, Kayu Kelas II atau III
Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.150 Rp. 174,748.00 Rp. 26,212.20
Tukang Kayu L.02 OH 0.300 Rp. 183,834.00 Rp. 55,150.20
Kepala Tukang L.03 OH 0.030 Rp. 199,782.00 Rp. 5,993.46
Mandor L.04 OH 0.075 Rp. 211,379.00 Rp. 15,853.43
Jumlah Tenaga Kerja (A) Rp. 103,209.29
B BAHAN
Kayu 5 x 7, Kayu Kelas II M3 0.0154 Rp. 6,765,000.00 Rp. 104,181.00
Paku Biasa 5 cm - 10 cm Kg 0.200 Rp. 20,000.00 Rp. 4,000.00

Jumlah Harga Bahan (B) Rp. 108,181.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 211,390.29
E Overhead & Profit 10% x D Rp. 21,139.03
F Harga Satuan Pekerjaan ( D + E ) Rp. 232,529.31
G Dibulatkan Rp. 232,520.00

A.4.6.1.20 Pemasangan 1 m2 Rangka Langit-Langit (60 x 60) cm, Kayu Kelas II atau III
Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.200 Rp. 174,748.00 Rp. 34,949.60
Tukang Kayu L.02 OH 0.300 Rp. 183,834.00 Rp. 55,150.20
Kepala Tukang L.03 OH 0.030 Rp. 199,782.00 Rp. 5,993.46
Mandor L.04 OH 0.010 Rp. 211,379.00 Rp. 2,113.79
Jumlah Tenaga Kerja (A) Rp. 98,207.05
B BAHAN
Kayu 5 x 7, Kayu Kelas II M3 0.0163 Rp. 6,765,000.00 Rp. 110,269.50
Paku Biasa 5 cm - 10 cm Kg 0.250 Rp. 20,000.00 Rp. 5,000.00

Jumlah Harga Bahan (B) Rp. 115,269.50


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 213,476.55
E Overhead & Profit 10% x D Rp. 21,347.66
F Harga Satuan Pekerjaan ( D + E ) Rp. 234,824.21
G Dibulatkan Rp. 234,820.00

A.4.6.1.21 Pemasangan 1 m' Listplank Ukuran (3 x 20) cm, Kayu Kelas I atau Kelas II
Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.100 Rp. 174,748.00 Rp. 17,474.80
Tukang Kayu L.02 OH 0.200 Rp. 183,834.00 Rp. 36,766.80
Kepala Tukang L.03 OH 0.020 Rp. 199,782.00 Rp. 3,995.64
Mandor L.04 OH 0.005 Rp. 211,379.00 Rp. 1,056.90
Jumlah Tenaga Kerja (A) Rp. 59,294.14
B BAHAN
Lisplank GRC Betawi m 1.0000 Rp. 116,666.67 Rp. 116,666.67
Paku Biasa 5 cm - 10 cm Kg 0.100 Rp. 13,000.00 Rp. 1,300.00

Jumlah Harga Bahan (B) Rp. 117,966.67


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 177,260.80
E Overhead & Profit 10% x D Rp. 17,726.08
F Harga Satuan Pekerjaan ( D + E ) Rp. 194,986.88
G Dibulatkan Rp. 194,980.00

A.4.6.1.22 Pemasangan 1 m' Listplank Ukuran (3 x 30) cm, Kayu Kelas I atau Kelas II
Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.100 Rp. 174,748.00 Rp. 17,474.80
Tukang Kayu L.02 OH 0.200 Rp. 183,834.00 Rp. 36,766.80
Kepala Tukang L.03 OH 0.020 Rp. 199,782.00 Rp. 3,995.64
Mandor L.04 OH 0.005 Rp. 211,379.00 Rp. 1,056.90
Jumlah Tenaga Kerja (A) Rp. 59,294.14
B BAHAN
Papan Kayu Kelas II m3 0.011 Rp. 5,500,000.00 Rp. 59,400.00
Paku Biasa 5 cm - 10 cm Kg 0.050 Rp. 20,000.00 Rp. 1,000.00

Jumlah Harga Bahan (B) Rp. 60,400.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 119,694.14
E Overhead & Profit 10% x D Rp. 11,969.41
F Harga Satuan Pekerjaan ( D + E ) Rp. 131,663.55
G Dibulatkan Rp. 131,660.00

A.4.6.1.23 Pemasangan 1 m2 Rangka Dinding Pemisah (60 x 120) cm Kayu Kelas II atau III
Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.150 Rp. 174,748.00 Rp. 26,212.20
Tukang Kayu L.02 OH 0.450 Rp. 183,834.00 Rp. 82,725.30
Kepala Tukang L.03 OH 0.045 Rp. 199,782.00 Rp. 8,990.19
Mandor L.04 OH 0.008 Rp. 211,379.00 Rp. 1,585.34
Jumlah Tenaga Kerja (A) Rp. 119,513.03
B BAHAN
Kayu Kelas II (Kamper/Kruing/dll) M3 0.028 Rp. 5,500,000.00 Rp. 154,000.00
Paku Biasa 5 cm - 10 cm Kg 0.150 Rp. 20,000.00 Rp. 3,000.00

Jumlah Harga Bahan (B) Rp. 157,000.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 276,513.03
E Overhead & Profit 10% x D Rp. 27,651.30
F Harga Satuan Pekerjaan ( D + E ) Rp. 304,164.34
G Dibulatkan Rp. 304,160.00

Analisa : AHSP A.0.0.18


Item : Pemasangan 1 m2 Dinding Pemisah Plywood Rangkap, Kayu Kelas II
Satuan : m2

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.200 Rp. 174,748.00
Tukang Kayu L.02 OH 0.600 Rp. 183,834.00
Kepala Tukang L.03 OH 0.060 Rp. 199,782.00
Mandor L.04 OH 0.010 Rp. 211,379.00
Jumlah Tenaga Kerja (A) Rp -
B BAHAN
Kayu Kelas II (Kamper/Kruing/dll) M3 0.028 Rp. 1,500,000.00 Rp. 42,000.00
Paku Biasa 5 cm - 10 cm Kg 0.150 Rp. 13,560.00 Rp. 2,034.00
Plywood 4 mm (120 x 240 cm) / GRC Lembar 0.860 Rp. 92,200.00 Rp. 79,292.00
gypsum tape / Lem Kayu kg 0.560 Rp. 12,900.00 Rp. 7,224.00
Jumlah Harga Bahan (B) Rp. 130,550.00
C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 130,550.00
E Overhead & Profit 10% x D Rp. 13,055.00
F Harga Satuan Pekerjaan ( D + E ) Rp. 143,605.00
G Dibulatkan Rp. 143,600.00

A.4.6.1.26 Pemasangan 1 m2 Dinding Lambrisering Dari Papan Kayu Kelas I


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.600 Rp. 174,748.00 Rp. 104,848.80
Tukang Kayu L.02 OH 1.800 Rp. 183,834.00 Rp. 330,901.20
Kepala Tukang L.03 OH 0.180 Rp. 199,782.00 Rp. 35,960.76
Mandor L.04 OH 0.030 Rp. 211,379.00 Rp. 6,341.37
Jumlah Tenaga Kerja (A) Rp. 478,052.13
B BAHAN
Papan Kayu Kelas I m3 0.007 Rp. 6,400,000.00 Rp. 44,800.00
Paku Biasa 5 cm - 10 cm Kg 0.100 Rp. 20,000.00 Rp. 2,000.00
Paku skrup 10 cm Kg 0.150 Rp. 35,000.00 Rp. 5,250.00

Jumlah Harga Bahan (B) Rp. 52,050.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 530,102.13
E Overhead & Profit 10% x D Rp. 53,010.21
F Harga Satuan Pekerjaan ( D + E ) Rp. 583,112.34
G Dibulatkan Rp. 583,110.00

A.4.6.1.27 Pemasangan 1 m2 Dinding Lambrisering Dari Plywood Ukuran (120 x 240) cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.025 Rp. 174,748.00 Rp. 4,368.70
Tukang Kayu L.02 OH 0.075 Rp. 183,834.00 Rp. 13,787.55
Kepala Tukang L.03 OH 0.008 Rp. 199,782.00 Rp. 1,498.37
Mandor L.04 OH 0.001 Rp. 211,379.00 Rp. 264.22
Jumlah Tenaga Kerja (A) Rp. 19,918.84
B BAHAN
Plywood 4 mm m2 0.400 Rp. 92,200.00 Rp. 36,880.00
Paku Biasa 5 cm - 10 cm Kg 0.050 Rp. 20,000.00 Rp. 1,000.00

Jumlah Harga Bahan (B) Rp. 37,880.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 57,798.84
E Overhead & Profit 10% x D Rp. 5,779.88
F Harga Satuan Pekerjaan ( D + E ) Rp. 63,578.72
G Dibulatkan Rp. 63,570.00
A.4.6.2. HARGA SATUAN PEKERJAAN KUNCI DAN KACA

A.4.6.2.1 Pemasangan 1 Buah Kunci Tanam Antik


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.060 Rp. 174,748.00 Rp. 10,484.88
Tukang Kayu L.02 OH 0.600 Rp. 183,834.00 Rp. 110,300.40
Kepala Tukang L.03 OH 0.060 Rp. 199,782.00 Rp. 11,986.92
Mandor L.04 OH 0.003 Rp. 211,379.00 Rp. 634.14
Jumlah Tenaga Kerja (A) Rp. 133,406.34
B BAHAN
#NAME? #NAME? 1.000 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

A.4.6.2.2 Pemasangan 1 Buah Kunci Tanam Biasa


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.010 Rp. 174,748.00 Rp. 1,747.48
Tukang Kayu L.02 OH 0.500 Rp. 183,834.00 Rp. 91,917.00
Kepala Tukang L.03 OH 0.050 Rp. 199,782.00 Rp. 9,989.10
Mandor L.04 OH 0.005 Rp. 211,379.00 Rp. 1,056.90
Jumlah Tenaga Kerja (A) Rp. 104,710.48
B BAHAN
Kunci Tanam Biasa ls 1.000 Rp. 357,000.00 Rp. 357,000.00

Jumlah Harga Bahan (B) Rp. 357,000.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 461,710.48
E Overhead & Profit 10% x D Rp. 46,171.05
F Harga Satuan Pekerjaan ( D + E ) Rp. 507,881.52
G Dibulatkan Rp. 507,880.00

A.4.6.2.3 Pemasangan 1 Buah Kunci Kamar Mandi


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.005 Rp. 174,748.00 Rp. 873.74
Tukang Kayu L.02 OH 0.500 Rp. 183,834.00 Rp. 91,917.00
Kepala Tukang L.03 OH 0.050 Rp. 199,782.00 Rp. 9,989.10
Mandor L.04 OH 0.003 Rp. 211,379.00 Rp. 528.45
Jumlah Tenaga Kerja (A) Rp. 103,308.29
B BAHAN
#NAME? #NAME? 1.000 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

A.4.6.2.4 Pemasangan 1 Buah Kunci Kamar Silinder


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.005 Rp. 174,748.00 Rp. 873.74
Tukang Kayu L.02 OH 0.500 Rp. 183,834.00 Rp. 91,917.00
Kepala Tukang L.03 OH 0.050 Rp. 199,782.00 Rp. 9,989.10
Mandor L.04 OH 0.003 Rp. 211,379.00 Rp. 528.45
Jumlah Tenaga Kerja (A) Rp. 103,308.29
B BAHAN
#NAME? #NAME? 1.000 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

A.4.6.2.5 Pemasangan 1 Buah Engsel Pintu


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.015 Rp. 174,748.00 Rp. 2,621.22
Tukang Kayu L.02 OH 0.150 Rp. 183,834.00 Rp. 27,575.10
Kepala Tukang L.03 OH 0.015 Rp. 199,782.00 Rp. 2,996.73
Mandor L.04 OH 0.008 Rp. 211,379.00 Rp. 1,585.34
Jumlah Tenaga Kerja (A) Rp. 34,778.39
B BAHAN
Engsel Pintu ls 1.000 Rp. 60,000.00 Rp. 60,000.00

Jumlah Harga Bahan (B) Rp. 60,000.00


C PERALATAN
Jumlah Harga Alat (C) Rp -
D Jumlah ( A + B + C ) Rp. 94,778.39
E Overhead & Profit 10% x D Rp. 9,477.84
F Harga Satuan Pekerjaan ( D + E ) Rp. 104,256.23
G Dibulatkan Rp. 104,250.00

A.4.6.2.6 Pemasangan 1 Buah Engsel Jendela Kupu-Kupu (Casemen)


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.010 Rp. 174,748.00 Rp. 1,747.48
Tukang Kayu L.02 OH 0.100 Rp. 183,834.00 Rp. 18,383.40
Kepala Tukang L.03 OH 0.010 Rp. 199,782.00 Rp. 1,997.82
Mandor L.04 OH 0.0005 Rp. 211,379.00 Rp. 105.69
Jumlah Tenaga Kerja (A) Rp. 22,234.39
B BAHAN
engsel casemen bh 1.000 Rp. 30,000.00 Rp. 30,000.00

Jumlah Harga Bahan (B) Rp. 30,000.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 52,234.39
E Overhead & Profit 10% x D Rp. 5,223.44
F Harga Satuan Pekerjaan ( D + E ) Rp. 57,457.83
G Dibulatkan Rp. 57,450.00

A.4.6.2.7 Pemasangan 1 Buah Engsel Angin


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.100 Rp. 174,748.00 Rp. 17,474.80
Tukang Kayu L.02 OH 0.200 Rp. 183,834.00 Rp. 36,766.80
Kepala Tukang L.03 OH 0.020 Rp. 199,782.00 Rp. 3,995.64
Mandor L.04 OH 0.0005 Rp. 211,379.00 Rp. 105.69
Jumlah Tenaga Kerja (A) Rp. 58,342.93
B BAHAN
engsel casemen ls 1.000 Rp. 152,500.00 Rp. 152,500.00

Jumlah Harga Bahan (B) Rp. 152,500.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 210,842.93
E Overhead & Profit 10% x D Rp. 21,084.29
F Harga Satuan Pekerjaan ( D + E ) Rp. 231,927.22
G Dibulatkan Rp. 231,920.00

A.4.6.2.8 Pemasangan 1 Buah Spring Knip, handle casemen.


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.015 Rp. 174,748.00 Rp. 2,621.22
Tukang Kayu L.02 OH 0.150 Rp. 183,834.00 Rp. 27,575.10
Kepala Tukang L.03 OH 0.015 Rp. 199,782.00 Rp. 2,996.73
Mandor L.04 OH 0.008 Rp. 211,379.00 Rp. 1,585.34
Jumlah Tenaga Kerja (A) Rp. 34,778.39
B BAHAN
handle casemen bh 1.000 Rp. 11,500.00 Rp. 11,500.00

Jumlah Harga Bahan (B) Rp. 11,500.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 46,278.39
E Overhead & Profit 10% x D Rp. 4,627.84
F Harga Satuan Pekerjaan ( D + E ) Rp. 50,906.23
G Dibulatkan Rp. 50,900.00

A.4.6.2.9 Pemasangan 1 Buah Kait Angin


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.015 Rp. 174,748.00 Rp. 2,621.22
Tukang Kayu L.02 OH 0.150 Rp. 183,834.00 Rp. 27,575.10
Kepala Tukang L.03 OH 0.015 Rp. 199,782.00 Rp. 2,996.73
Mandor L.04 OH 0.008 Rp. 211,379.00 Rp. 1,585.34
Jumlah Tenaga Kerja (A) Rp. 34,778.39
B BAHAN
#NAME? #NAME? 1.000 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

A.4.6.2.10 Pemasangan 1 Buah Door Closer


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.050 Rp. 174,748.00 Rp. 8,737.40
Tukang Kayu L.02 OH 0.500 Rp. 183,834.00 Rp. 91,917.00
Kepala Tukang L.03 OH 0.050 Rp. 199,782.00 Rp. 9,989.10
Mandor L.04 OH 0.003 Rp. 211,379.00 Rp. 528.45
Jumlah Tenaga Kerja (A) Rp. 111,171.95
B BAHAN
Handle Dekson buah 1.000 Rp. 2,200,000.00 Rp. 2,200,000.00
Jumlah Harga Bahan (B) Rp. 2,200,000.00
C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 2,311,171.95
E Overhead & Profit 10% x D Rp. 231,117.19
F Harga Satuan Pekerjaan ( D + E ) Rp. 2,542,289.14
G Dibulatkan Rp. 2,542,280.00

A.4.6.2.10 Pemasangan 1 Buah Door Closer


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.050 Rp. 174,748.00 Rp. 8,737.40
Tukang Kayu L.02 OH 0.500 Rp. 183,834.00 Rp. 91,917.00
Kepala Tukang L.03 OH 0.050 Rp. 199,782.00 Rp. 9,989.10
Mandor L.04 OH 0.003 Rp. 211,379.00 Rp. 528.45
Jumlah Tenaga Kerja (A) Rp. 111,171.95
B BAHAN
Handle Dekson buah 1.000 Rp. 219,000.00 Rp. 219,000.00

Jumlah Harga Bahan (B) Rp. 219,000.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 330,171.95
E Overhead & Profit 10% x D Rp. 33,017.19
F Harga Satuan Pekerjaan ( D + E ) Rp. 363,189.14
G Dibulatkan Rp. 363,180.00

A.4.6.2.11 Pemasangan 1 Buah Kunci Slot


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.020 Rp. 174,748.00 Rp. 3,494.96
Tukang Kayu L.02 OH 0.200 Rp. 183,834.00 Rp. 36,766.80
Kepala Tukang L.03 OH 0.020 Rp. 199,782.00 Rp. 3,995.64
Mandor L.04 OH 0.001 Rp. 211,379.00 Rp. 211.38
Jumlah Tenaga Kerja (A) Rp. 44,468.78
B BAHAN
Kunci slot ls 1.000 Rp. 45,000.00 Rp. 45,000.00

Jumlah Harga Bahan (B) Rp. 45,000.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 89,468.78
E Overhead & Profit 10% x D Rp. 8,946.88
F Harga Satuan Pekerjaan ( D + E ) Rp. 98,415.66
G Dibulatkan Rp. 98,410.00
A.4.6.2.12 Pemasangan 1 Buah Door Holder
Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.050 Rp. 174,748.00 Rp. 8,737.40
Tukang Kayu L.02 OH 0.500 Rp. 183,834.00 Rp. 91,917.00
Kepala Tukang L.03 OH 0.050 Rp. 199,782.00 Rp. 9,989.10
Mandor L.04 OH 0.003 Rp. 211,379.00 Rp. 528.45
Jumlah Tenaga Kerja (A) Rp. 111,171.95
B BAHAN
#NAME? #NAME? 1.000 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

A.4.6.2.13 Pemasangan 1 Buah Door Stop


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.010 Rp. 174,748.00 Rp. 1,747.48
Tukang Kayu L.02 OH 0.100 Rp. 183,834.00 Rp. 18,383.40
Kepala Tukang L.03 OH 0.010 Rp. 199,782.00 Rp. 1,997.82
Mandor L.04 OH 0.005 Rp. 211,379.00 Rp. 1,056.90
Jumlah Tenaga Kerja (A) Rp. 23,185.60
B BAHAN
#NAME? #NAME? 1.000 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

A.4.6.2.14 Pemasangan 1 Buah Rel Pintu Sorong


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.060 Rp. 174,748.00 Rp. 10,484.88
Tukang Kayu L.02 OH 0.600 Rp. 183,834.00 Rp. 110,300.40
Kepala Tukang L.03 OH 0.060 Rp. 199,782.00 Rp. 11,986.92
Mandor L.04 OH 0.003 Rp. 211,379.00 Rp. 634.14
Jumlah Tenaga Kerja (A) Rp. 133,406.34
B BAHAN
#NAME? #NAME? 1.000 #NAME? #NAME?
Jumlah Harga Bahan (B) #NAME?
C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Analisa : AHSP A.0.0.19


Item : Pemasangan 1 m2 Pintu Rolling Door
Satuan : m2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.200 Rp. 174,748.00 Rp. 34,949.60
Tukang Las Biasa OH 0.100 Rp. 183,834.00 Rp. 18,383.40
Kepala Tukang L.03 OH 0.012 Rp. 199,782.00 Rp. 2,397.38
Mandor L.04 OH 0.005 Rp. 211,379.00 Rp. 1,056.90
Jumlah Tenaga Kerja (A) Rp. 56,787.28
B BAHAN
Pintu Gulung Besi m1 1.000 Rp. 350,000.00 Rp. 350,000.00

Jumlah Harga Bahan (B) Rp. 350,000.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 406,787.28
E Overhead & Profit 10% x D Rp. 40,678.73
F Harga Satuan Pekerjaan ( D + E ) Rp. 447,466.01
G Dibulatkan Rp. 447,460.00

A.4.6.2.16 Pemasangan 1 m2 Kaca Tebal 3 mm


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.015 Rp. 174,748.00 Rp. 2,621.22
Tukang Kayu L.02 OH 0.150 Rp. 183,834.00 Rp. 27,575.10
Kepala Tukang L.03 OH 0.015 Rp. 199,782.00 Rp. 2,996.73
Mandor L.04 OH 0.0008 Rp. 211,379.00 Rp. 158.53
Jumlah Tenaga Kerja (A) Rp. 33,351.58
B BAHAN
#NAME? #NAME? 1.100 #NAME? #NAME?
#NAME? #NAME? 0.050 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

A.4.6.2.17 Pemasangan 1 m2 Kaca Tebal 5 mm


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.015 Rp. 174,748.00 Rp. 2,621.22
Tukang Kayu L.02 OH 0.150 Rp. 183,834.00 Rp. 27,575.10
Kepala Tukang L.03 OH 0.015 Rp. 199,782.00 Rp. 2,996.73
Mandor L.04 OH 0.0008 Rp. 211,379.00 Rp. 158.53
Jumlah Tenaga Kerja (A) Rp. 33,351.58
B BAHAN
Kaca Polos 5mm m2 1.100 Rp. 114,000.00 Rp. 125,400.00
Sealant kg 0.075 Rp. 56,250.00 Rp. 4,218.75

Jumlah Harga Bahan (B) Rp. 129,618.75


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 162,970.33
E Overhead & Profit 10% x D Rp. 16,297.03
F Harga Satuan Pekerjaan ( D + E ) Rp. 179,267.37
G Dibulatkan Rp. 179,260.00

A.4.6.2.18 Pemasangan 1 m2 Kaca Tebal 8 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.017 Rp. 174,748.00 Rp. 2,970.72
Tukang Kayu L.02 OH 0.170 Rp. 183,834.00 Rp. 31,251.78
Kepala Tukang L.03 OH 0.017 Rp. 199,782.00 Rp. 3,396.29
Mandor L.04 OH 0.0009 Rp. 211,379.00 Rp. 179.67
Jumlah Tenaga Kerja (A) Rp. 37,798.46
B BAHAN
Kaca Polos 8mm m2 1.100 Rp. 200,000.00 Rp. 220,000.00
sealant kg 0.075 Rp. 56,250.00 Rp. 4,218.75

Jumlah Harga Bahan (B) Rp. 224,218.75


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 262,017.21
E Overhead & Profit 10% x D Rp. 26,201.72
F Harga Satuan Pekerjaan ( D + E ) Rp. 288,218.93
G Dibulatkan Rp. 288,210.00

A.4.6.2.19 Pemasangan 1 m2 Kaca Buram Tebal 12 mm


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.025 Rp. 174,748.00 Rp. 4,368.70
Tukang Kayu L.02 OH 0.250 Rp. 183,834.00 Rp. 45,958.50
Kepala Tukang L.03 OH 0.025 Rp. 199,782.00 Rp. 4,994.55
Mandor L.04 OH 0.0013 Rp. 211,379.00 Rp. 264.22
Jumlah Tenaga Kerja (A) Rp. 55,585.97
B BAHAN
#NAME? #NAME? 1.100 #NAME? #NAME?
#NAME? #NAME? 0.070 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

A.4.6.2.20 Pemasangan 1 m2 Kaca Cermin Tebal 5 mm


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.015 Rp. 174,748.00 Rp. 2,621.22
Tukang Kayu L.02 OH 0.150 Rp. 183,834.00 Rp. 27,575.10
Kepala Tukang L.03 OH 0.015 Rp. 199,782.00 Rp. 2,996.73
Mandor L.04 OH 0.0008 Rp. 211,379.00 Rp. 158.53
Jumlah Tenaga Kerja (A) Rp. 33,351.58
B BAHAN
Kaca Cermin 5mm Asahi lbr 1.000 Rp. 266,000.00 Rp. 266,000.00

Jumlah Harga Bahan (B) Rp. 266,000.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 299,351.58
E Overhead & Profit 10% x D Rp. 29,935.16
F Harga Satuan Pekerjaan ( D + E ) Rp. 329,286.74
G Dibulatkan Rp. 329,280.00

A.4.6.2.21 Pemasangan 1 m2 Kaca Cermin Tebal 8 mm


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.017 Rp. 174,748.00 Rp. 2,970.72
Tukang Kayu L.02 OH 0.170 Rp. 183,834.00 Rp. 31,251.78
Kepala Tukang L.03 OH 0.017 Rp. 199,782.00 Rp. 3,396.29
Mandor L.04 OH 0.0009 Rp. 211,379.00 Rp. 179.67
Jumlah Tenaga Kerja (A) Rp. 37,798.46
B BAHAN
#NAME? #NAME? 1.100 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN
Jumlah Harga Alat (C) Rp -
D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

A.4.6.2.22 Pemasangan 1 m2 Kaca Wireglassed Tebal 5 mm


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.015 Rp. 174,748.00 Rp. 2,621.22
Tukang Kayu L.02 OH 0.150 Rp. 183,834.00 Rp. 27,575.10
Kepala Tukang L.03 OH 0.015 Rp. 199,782.00 Rp. 2,996.73
Mandor L.04 OH 0.0008 Rp. 211,379.00 Rp. 158.53
Jumlah Tenaga Kerja (A) Rp. 33,351.58
B BAHAN
#NAME? #NAME? 1.100 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

A.4.6.2.23 Pemasangan 1 m2 Kaca Pantry Tebal 5 mm


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.075 Rp. 174,748.00 Rp. 13,106.10
Tukang Kayu L.02 OH 0.150 Rp. 183,834.00 Rp. 27,575.10

Kepala Tukang L.03 OH 0.015 Rp. 199,782.00 Rp. 2,996.73

Mandor L.04 OH 0.0038 Rp. 211,379.00 Rp. 792.67


Jumlah Tenaga Kerja (A) Rp. 44,470.60
B BAHAN
#NAME? #NAME? 1.100 #NAME? #NAME?
#NAME? #NAME? 0.050 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
Analisa : AHSP A.0.0.20
Item : Pengecatan 1 m2 Tembok Baru ( 1 Lapis Plamur, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup ) Exterior
Satuan : m2

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.040 Rp. 174,748.00 Rp. 6,989.92
Tukang Kayu L.02 OH 0.070 Rp. 183,834.00 Rp. 12,868.38
Kepala Tukang L.03 OH 0.0063 Rp. 199,782.00 Rp. 1,258.63

Mandor L.04 OH 0.003 Rp. 211,379.00 Rp. 634.14

Jumlah Tenaga Kerja (A) Rp. 21,751.06


B BAHAN
Plamur kg 0.100 Rp. 15,000.00 Rp. 1,500.00
Cat Dasar Exterior Catylac Kg 0.100 Rp. 30,947.05 Rp. 3,094.70
Cat Penutup Exterior Catylac Kg 0.260 Rp. 37,995.52 Rp. 9,878.84

Jumlah Harga Bahan (B) Rp. 14,473.54


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 36,224.60
E Overhead & Profit 10% x D Rp. 3,622.46
F Harga Satuan Pekerjaan ( D + E ) Rp. 39,847.06
G Dibulatkan Rp. 39,847.06

Analisa : AHSP A.4.7.1.10.a


Item : Pengecatan 1 m2 Tembok Baru ( 1 Lapis Plamur, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup ) Interior
Satuan : m2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.020 Rp. 174,748.00 Rp. 3,494.96

Tukang Kayu L.02 OH 0.063 Rp. 183,834.00 Rp. 11,581.54

Kepala Tukang L.03 OH 0.0063 Rp. 199,782.00 Rp. 1,258.63


Mandor L.04 OH 0.003 Rp. 211,379.00 Rp. 704.60
Jumlah Tenaga Kerja (A) Rp. 17,039.73
B BAHAN
Plamur kg 0.100 Rp. 14,175.00 Rp. 1,417.50
Cat Dasar kg 0.100 Rp. 18,124.00 Rp. 1,812.40
Cat Penutup Interior Setara Jotun kg 0.260 Rp. 34,994.40 Rp. 9,098.54

Jumlah Harga Bahan (B) Rp. 12,328.44


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 29,368.17
E Overhead & Profit 10% x D Rp. 2,936.82
F Harga Satuan Pekerjaan ( D + E ) Rp. 32,304.99
G Dibulatkan Rp. 32,304.00

Analisa : AHSP A.4.7.1.11


Item : Pengecatan 1 m2 Tembok Lama ( 1 Lapis Cat Dasar, 2 Lapis Cat Penutup )
Satuan : m2

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.028 Rp. 174,748.00 Rp. 4,892.94
Tukang Kayu L.02 OH 0.042 Rp. 183,834.00 Rp. 7,721.03
Kepala Tukang L.03 OH 0.0042 Rp. 199,782.00 Rp. 839.08
Mandor L.04 OH 0.003 Rp. 211,379.00 Rp. 696.31
Jumlah Tenaga Kerja (A) Rp. 14,149.36

B BAHAN

Cat Dasar Kg 0.120 Rp. 18,124.00 Rp. 2,174.88


Cat penutup Interior kg 0.180 Rp. 53,837.54 Rp. 9,690.76

Jumlah Harga Bahan (B) Rp. 11,865.64


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 26,015.00
E Overhead & Profit 10% x D Rp. 2,601.50
F Harga Satuan Pekerjaan ( D + E ) Rp. 28,616.50
G Dibulatkan Rp. 28,616.00

Analisa : AHSP A.0.0.21


Item : Pengecatan 1 m2 Cat Besi
Satuan : m2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.020 Rp. 174,748.00 Rp. 3,494.96
Tuakng Cat OH 0.200 Rp. 183,834.00 Rp. 36,766.80
Kepala Tukang L.03 OH 0.020 Rp. 199,782.00 Rp. 3,995.64
Mandor L.04 OH 0.003 Rp. 211,379.00 Rp. 634.14
Jumlah Tenaga Kerja (A) Rp. 44,891.54
B BAHAN
Cat Besi AVIAN kg 0.300 Rp. 68,000.00 Rp. 20,400.00
Kuas 4' bh 0.010 Rp. 5,300.00 Rp. 53.00

Jumlah Harga Bahan (B) Rp. 20,453.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 65,344.54
E Overhead & Profit 10% x D Rp. 6,534.45
F Harga Satuan Pekerjaan ( D + E ) Rp. 71,878.99
G Dibulatkan Rp. 71,878.00

Analisa : AHSP A.0.0.21


Item : Pengecatan 1 m2 Plafond
Satuan : m2

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja OH 0.060 Rp. 174,748.00 Rp. 10,484.88
Tuakng Cat OH 0.040 Rp. 183,834.00 Rp. 7,353.36
Kepala Tukang OH 0.004 Rp. 199,782.00 Rp. 799.13
Mandor OH 0.003 Rp. 211,379.00 Rp. 634.14
Jumlah Tenaga Kerja (A) Rp. 19,271.50
B BAHAN
Cat Tembok Galon 0.094 Rp. 253,000.00 Rp. 23,782.00
Plamur Tembok Galon 0.020 Rp. 270,000.00 Rp. 5,400.00
Amplas Lembar 0.500 Rp. 6,000.00 Rp. 3,000.00
Kape Buah 0.050 Rp. 5,000.00 Rp. 250.00
Kuas Roll Buah 0.010 Rp. 30,000.00 Rp. 300.00
Jumlah Harga Bahan (B) Rp. 32,732.00
C PERALATAN
Jumlah Harga Alat (C) Rp -
D Jumlah ( A + B + C ) Rp. 52,003.51
E Overhead & Profit 10% x D Rp. 5,200.35
F Harga Satuan Pekerjaan ( D + E ) Rp. 57,203.86
G Dibulatkan Rp. 57,203.00

AHSP A.5.1.1. HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG

Analisa : AHSP A.5.5.1.1


Item : Pemasangan 1 Buah Kloset Duduk
Satuan : bh

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 1.000 Rp. 174,748.00 Rp. 174,748.00
Tukang Batu L.02 OH 1.500 Rp. 183,834.00 Rp. 275,751.00
Kepala Tukang L.03 OH 1.500 Rp. 199,782.00 Rp. 299,673.00
Mandor L.04 OH 0.160 Rp. 211,379.00 Rp. 33,820.64
Jumlah Tenaga Kerja (A) Rp. 783,992.64
B BAHAN

Kloset Duduk Keramik Buah 1.000 Rp. 2,295,000.00 Rp. 2,295,000.00

Semen zak 0.150 Rp. 46,750.00 Rp. 7,012.50


Pasir m3 0.010 Rp. 221,285.71 Rp. 2,212.86
Jumlah Harga Bahan (B) Rp. 2,304,225.36
C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 3,088,218.00
E Overhead & Profit 10% x D Rp. 308,821.80
F Harga Satuan Pekerjaan ( D + E ) Rp. 3,397,039.80
G Dibulatkan Rp. 3,397,039.00

Analisa : AHSP A.5.5.1.2


Item : Pemasangan 1 Buah Kloset Jongkok Porselen
Satuan : bh

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.000 Rp. 174,748.00 Rp. 174,748.00
Tukang Batu L.02 OH 1.500 Rp. 183,834.00 Rp. 275,751.00
Kepala Tukang L.03 OH 0.015 Rp. 199,782.00 Rp. 2,996.73
Mandor L.04 OH 0.160 Rp. 211,379.00 Rp. 33,820.64
Jumlah Tenaga Kerja (A) Rp. 487,316.37
B BAHAN
Kloset Jongkok Keramik Buah 1.000 Rp. 860,000.00 Rp. 860,000.00
Semen @ 40 Kg Kg 6.000 Rp. 1,450.00 Rp. 8,700.00
Pasir Pasang (1400 kg/m3) M3 0.010 Rp. 217,000.00 Rp. 2,170.00

Jumlah Harga Bahan (B) Rp. 870,870.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 1,358,186.37
E Overhead & Profit 10% x D Rp. 135,818.64
F Harga Satuan Pekerjaan ( D + E ) Rp. 1,494,005.01
G Dibulatkan Rp. 1,494,005.00

Analisa : AHSP A.5.5.1.5


Item : Pemasangan 1 Buah Wastafel
Satuan : bh

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.200 Rp. 174,748.00 Rp. 209,697.60
Tukang Batu L.02 OH 1.450 Rp. 183,834.00 Rp. 266,559.30
Kepala Tukang L.03 OH 0.014 Rp. 199,782.00 Rp. 2,896.84
Mandor L.04 OH 0.100 Rp. 211,379.00 Rp. 21,137.90
Jumlah Tenaga Kerja (A) Rp. 500,291.64
B BAHAN
Wastafel Bh 1.000 Rp. 1,700,000.00 Rp. 1,700,000.00

Semen @ 40 Kg zak 0.150 Rp. 46,750.00 Rp. 7,012.50

Pasir Pasang (1400 kg/m3) M3 0.010 Rp. 217,000.00 Rp. 2,170.00


Perlengkapan % 12% Rp. 150,600.00 Rp. 18,072.00

Jumlah Harga Bahan (B) Rp. 1,727,254.50


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 2,227,546.14
E Overhead & Profit 10% x D Rp. 222,754.61
F Harga Satuan Pekerjaan ( D + E ) Rp. 2,450,300.75
G Dibulatkan Rp. 2,450,300.00

Analisa : AHSP A.5.5.1.4


Item : Pemasangan 1 Buah Floor Drain
Satuan : bh

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.010 Rp. 174,748.00 Rp. 1,747.48
Tukang Batu L.02 OH 0.100 Rp. 183,834.00 Rp. 18,383.40
Kepala Tukang L.03 OH 0.010 Rp. 199,782.00 Rp. 1,997.82
Mandor L.04 OH 0.005 Rp. 211,379.00 Rp. 1,056.90
Jumlah Tenaga Kerja (A) Rp. 23,185.60
B BAHAN
Floor Drain Setara Toto Buah 1.000 Rp. 375,000.00 Rp. 375,000.00

Jumlah Harga Bahan (B) Rp. 375,000.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 398,185.60
E Overhead & Profit 10% x D Rp. 39,818.56
F Harga Satuan Pekerjaan ( D + E ) Rp. 438,004.15
G Dibulatkan Rp. 438,004.00

Analisa : AHSP A.5.5.1.17


Item : Pemasangan 1 Buah Bak Kontrol Pasangan Bata 60 x 60 Tinggi 65 cm
Satuan : bh

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 3.200 Rp. 174,748.00 Rp. 559,193.60
Tukang Batu L.02 OH 1.150 Rp. 183,834.00 Rp. 211,409.10
Kepala Tukang L.03 OH 0.011 Rp. 199,782.00 Rp. 2,286.06
Mandor L.04 OH 0.016 Rp. 211,379.00 Rp. 3,382.06
Jumlah Tenaga Kerja (A) Rp. 776,270.83
B BAHAN
Batu Bata Buah 123.000 Rp. 700.00 Rp. 86,100.00

Semen @ 40 Kg Kg 114.000 Rp. 1,450.00 Rp. 165,300.00

Pasir Pasang (1400 kg/m3) M3 0.184 Rp. 217,000.00 Rp. 39,928.00


Pasir Beton (1400 kg/m3) M3 0.120 Rp. 217,000.00 Rp. 26,040.00
Kerikil (1350 kg/m3) M3 0.033 Rp. 217,000.00 Rp. 7,161.00
Besi Beton Polos Kg 4.850 Rp. 12,000.00 Rp. 58,200.00

Jumlah Harga Bahan (B) Rp. 382,729.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 1,158,999.83
E Overhead & Profit 10% x D Rp. 115,899.98
F Harga Satuan Pekerjaan ( D + E ) Rp. 1,274,899.81
G Dibulatkan Rp. 1,274,899.00

Analisa : AHSP A.5.5.1.18


Item : Pemasangan 1 m' Pipa Galvanis Diameter 1/2"
Satuan : m'

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.054 Rp. 174,748.00 Rp. 9,436.39
Tukang Batu L.02 OH 0.090 Rp. 183,834.00 Rp. 16,545.06
Kepala Tukang L.03 OH 0.009 Rp. 199,782.00 Rp. 1,798.04
Mandor L.04 OH 0.027 Rp. 211,379.00 Rp. 5,707.23
Jumlah Tenaga Kerja (A) Rp. 33,486.72
B BAHAN
Pipa Leiding Ø 1/2" Galvanis Tebal 3.2 mm m' 1.200 Rp. 30,750.00 Rp. 36,900.00
Perlengkapan % 35% Rp. 30,750.00 Rp. 10,762.50

Jumlah Harga Bahan (B) Rp. 47,662.50


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 81,149.22
E Overhead & Profit 10% x D Rp. 8,114.92
F Harga Satuan Pekerjaan ( D + E ) Rp. 89,264.15
G Dibulatkan Rp. 89,264.00

Analisa : AHSP A.5.5.1.19


Item : Pemasangan 1 Buah Kran Air Diameter 1/2" atau 3/4"
Satuan : bh

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.010 Rp. 174,748.00 Rp. 1,747.48
Tukang Batu L.02 OH 0.100 Rp. 183,834.00 Rp. 18,383.40
Kepala Tukang L.03 OH 0.010 Rp. 199,782.00 Rp. 1,997.82
Mandor L.04 OH 0.005 Rp. 211,379.00 Rp. 1,056.90
Jumlah Tenaga Kerja (A) Rp. 23,185.60
B BAHAN
Kran Air Dia. 1/2" - 3/4" Bh 1.000 Rp. 241,800.00 Rp. 241,800.00
Seal Tape Bh 1.000 Rp. 3,500.00 Rp. 3,500.00

Jumlah Harga Bahan (B) Rp. 245,300.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 268,485.60
E Overhead & Profit 10% x D Rp. 26,848.56
F Harga Satuan Pekerjaan ( D + E ) Rp. 295,334.15
G Dibulatkan Rp. 295,334.00

Analisa : AHSP A.5.5.1.20


Item : Pemasangan 1 m' Pipa Galvanis Diameter 3/4"
Satuan : m'

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.054 Rp. 174,748.00 Rp. 9,436.39
Tukang Batu L.02 OH 0.090 Rp. 183,834.00 Rp. 16,545.06
Kepala Tukang L.03 OH 0.009 Rp. 199,782.00 Rp. 1,798.04
Mandor L.04 OH 0.027 Rp. 211,379.00 Rp. 5,707.23
Jumlah Tenaga Kerja (A) Rp. 33,486.72
B BAHAN
Pipa Leiding Ø 3/4" Galvanis Tebal 3.2 mm m' 1.200 Rp. 38,333.33 Rp. 46,000.00
Perlengkapan % 35% Rp. 38,333.33 Rp. 13,416.67

Jumlah Harga Bahan (B) Rp. 59,416.67


C PERALATAN
Jumlah Harga Alat (C) Rp -
D Jumlah ( A + B + C ) Rp. 92,903.39
E Overhead & Profit 10% x D Rp. 9,290.34
F Harga Satuan Pekerjaan ( D + E ) Rp. 102,193.73
G Dibulatkan Rp. 102,193.00

Analisa : AHSP A.5.5.1.21


Item : Pemasangan 1 m' Pipa Galvanis Diameter 1"
Satuan : m'

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.054 Rp. 174,748.00 Rp. 9,436.39
Tukang Batu L.02 OH 0.090 Rp. 183,834.00 Rp. 16,545.06
Kepala Tukang L.03 OH 0.009 Rp. 199,782.00 Rp. 1,798.04
Mandor L.04 OH 0.027 Rp. 211,379.00 Rp. 5,707.23
Jumlah Tenaga Kerja (A) Rp. 33,486.72
B BAHAN
Pipa Leiding Ø 1" Galvanis Tebal 3.2 mm m' 1.200 Rp. 50,225.00 Rp. 60,270.00

Perlengkapan % 35% Rp. 50,225.00 Rp. 17,578.75

Jumlah Harga Bahan (B) Rp. 77,848.75


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 111,335.47
E Overhead & Profit 10% x D Rp. 11,133.55
F Harga Satuan Pekerjaan ( D + E ) Rp. 122,469.02
G Dibulatkan Rp. 122,469.00

Analisa : AHSP A.5.5.1.22


Item : Pemasangan 1 m' Pipa Galvanis Diameter 1 1/2"
Satuan : m'

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.108 Rp. 174,748.00 Rp. 18,872.78
Tukang Batu L.02 OH 0.180 Rp. 183,834.00 Rp. 33,090.12
Kepala Tukang L.03 OH 0.018 Rp. 199,782.00 Rp. 3,596.08
Mandor L.04 OH 0.005 Rp. 211,379.00 Rp. 1,141.45
Jumlah Tenaga Kerja (A) Rp. 56,700.43
B BAHAN
Pipa Leiding Ø 1 1/2" Galvanis Tebal 3.2 mm m' 1.200 Rp. 69,700.00 Rp. 83,640.00
Perlengkapan % 35% Rp. 69,700.00 Rp. 24,395.00
Jumlah Harga Bahan (B) Rp. 108,035.00
C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 164,735.43
E Overhead & Profit 10% x D Rp. 16,473.54
F Harga Satuan Pekerjaan ( D + E ) Rp. 181,208.97
G Dibulatkan Rp. 181,208.00

Analisa : AHSP A.5.5.1.23


Item : Pemasangan 1 m' Pipa Galvanis Diameter 3"
Satuan : m'
Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.135 Rp. 174,748.00 Rp. 23,590.98
Tukang Batu L.02 OH 0.225 Rp. 183,834.00 Rp. 41,362.65
Kepala Tukang L.03 OH 0.023 Rp. 199,782.00 Rp. 4,495.10
Mandor L.04 OH 0.007 Rp. 211,379.00 Rp. 1,426.81
Jumlah Tenaga Kerja (A) Rp. 70,875.53
B BAHAN
Pipa Leiding Ø 3" Galvanis Tebal 3.2 mm m' 1.200 Rp. 112,750.00 Rp. 135,300.00
Perlengkapan % 35% Rp. 112,750.00 Rp. 39,462.50

Jumlah Harga Bahan (B) Rp. 174,762.50


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 245,638.03
E Overhead & Profit 10% x D Rp. 24,563.80
F Harga Satuan Pekerjaan ( D + E ) Rp. 270,201.84
G Dibulatkan Rp. 270,201.00

Analisa : AHSP A.5.5.1.24


Item : Pemasangan 1 m' Pipa Galvanis Diameter 4"
Satuan : m'

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.135 Rp. 174,748.00 Rp. 23,590.98
Tukang Batu L.02 OH 0.225 Rp. 183,834.00 Rp. 41,362.65
Kepala Tukang L.03 OH 0.023 Rp. 199,782.00 Rp. 4,495.10
Mandor L.04 OH 0.007 Rp. 211,379.00 Rp. 1,426.81
Jumlah Tenaga Kerja (A) Rp. 70,875.53
B BAHAN
Pipa Leiding Ø 4" Galvanis Tebal 3.2 mm m' 1.200 Rp. 176,300.00 Rp. 211,560.00
Perlengkapan % 35% Rp. 176,300.00 Rp. 61,705.00
Jumlah Harga Bahan (B) Rp. 273,265.00
C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 344,140.53
E Overhead & Profit 10% x D Rp. 34,414.05
F Harga Satuan Pekerjaan ( D + E ) Rp. 378,554.59
G Dibulatkan Rp. 378,554.00

Analisa : AHSP A.0.0.22


Item : Pemasangan 1 m' Pipa PVC Tipe AW Diameter 1/2"
Satuan : m'
Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.036 Rp. 174,748.00 Rp. 6,290.93
Tukang Batu L.02 OH 0.060 Rp. 183,834.00 Rp. 11,030.04
Kepala Tukang L.03 OH 0.006 Rp. 199,782.00 Rp. 1,198.69
Mandor L.04 OH 0.002 Rp. 211,379.00 Rp. 380.48
Jumlah Tenaga Kerja (A) Rp. 18,900.14
B BAHAN
Pipa PVC Ø 1/2" Kualitas AWE (United) m' 1.200 Rp. 12,200.00 Rp. 14,640.00
Perlengkapan % 35% Rp. 12,200.00 Rp. 4,270.00

Jumlah Harga Bahan (B) Rp. 18,910.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 37,810.14
E Overhead & Profit 10% x D Rp. 3,781.01
F Harga Satuan Pekerjaan ( D + E ) Rp. 41,591.16
G Dibulatkan Rp. 41,591.00

Analisa : AHSP A.5.5.1.26


Item : Pemasangan 1 m' Pipa PVC Tipe AW Diameter 3/4"
Satuan : m'

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.036 Rp. 174,748.00 Rp. 6,290.93
Tukang Batu L.02 OH 0.060 Rp. 183,834.00 Rp. 11,030.04
Kepala Tukang L.03 OH 0.006 Rp. 199,782.00 Rp. 1,198.69
Mandor L.04 OH 0.002 Rp. 211,379.00 Rp. 380.48
Jumlah Tenaga Kerja (A) Rp. 18,900.14
B BAHAN
Pipa PVC Ø 3/4" m' 1.200 Rp. 9,249.50 Rp. 11,099.40
Perlengkapan % 35% Rp. 9,249.50 Rp. 3,237.33
Jumlah Harga Bahan (B) Rp. 14,336.72
C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 33,236.87
E Overhead & Profit 10% x D Rp. 3,323.69
F Harga Satuan Pekerjaan ( D + E ) Rp. 36,560.55
G Dibulatkan Rp. 36,560.00

Analisa : AHSP A.0.0.23


Item : Pemasangan 1 m' Pipa PVC Tipe AW Diameter 1"
Satuan : m'

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.036 Rp. 174,748.00 Rp. 6,290.93
Tukang Batu L.02 OH 0.060 Rp. 183,834.00 Rp. 11,030.04
Kepala Tukang L.03 OH 0.006 Rp. 199,782.00 Rp. 1,198.69
Mandor L.04 OH 0.002 Rp. 211,379.00 Rp. 380.48
Jumlah Tenaga Kerja (A) Rp. 18,900.14
B BAHAN
Pipa PVC Ø 1" m' 1.200 Rp. 21,000.00 Rp. 25,200.00
Perlengkapan % 35% Rp. 21,000.00 Rp. 7,350.00

Jumlah Harga Bahan (B) Rp. 32,550.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 51,450.14
E Overhead & Profit 10% x D Rp. 5,145.01
F Harga Satuan Pekerjaan ( D + E ) Rp. 56,595.16
G Dibulatkan Rp. 56,595.00

Analisa : AHSP A.5.5.1.28


Item : Pemasangan 1 m' Pipa PVC Tipe AW Diameter 1 1/2"
Satuan : m'

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.054 Rp. 174,748.00 Rp. 9,436.39
Tukang Batu L.02 OH 0.090 Rp. 183,834.00 Rp. 16,545.06
Kepala Tukang L.03 OH 0.009 Rp. 199,782.00 Rp. 1,798.04
Mandor L.04 OH 0.003 Rp. 211,379.00 Rp. 570.72
Jumlah Tenaga Kerja (A) Rp. 28,350.21
B BAHAN
Pipa PVC Ø 1 1/2" m' 1.200 Rp. 36,875.00 Rp. 44,250.00
Perlengkapan % 35% Rp. 36,875.00 Rp. 12,906.25

Jumlah Harga Bahan (B) Rp. 57,156.25


C PERALATAN
Jumlah Harga Alat (C) Rp -
D Jumlah ( A + B + C ) Rp. 85,506.46
E Overhead & Profit 10% x D Rp. 8,550.65
F Harga Satuan Pekerjaan ( D + E ) Rp. 94,057.11
G Dibulatkan Rp. 94,057.00

Analisa : AHSP A.5.5.1.29


Item : Pemasangan 1 m' Pipa PVC Tipe AW Diameter 1 1/4"
Satuan : m'

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.054 Rp. 174,748.00 Rp. 9,436.39
Tukang Batu L.02 OH 0.090 Rp. 183,834.00 Rp. 16,545.06
Kepala Tukang L.03 OH 0.009 Rp. 199,782.00 Rp. 1,798.04
Mandor L.04 OH 0.003 Rp. 211,379.00 Rp. 570.72
Jumlah Tenaga Kerja (A) Rp. 28,350.21
B BAHAN
PVC Tipe AW Diameter 1 1/4" btg 1.200 Rp. 30,000.00 Rp. 36,000.00
Perlengkapan % 35% Rp. 30,000.00 Rp. 10,500.00

Jumlah Harga Bahan (B) Rp. 46,500.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 74,850.21
E Overhead & Profit 10% x D Rp. 7,485.02
F Harga Satuan Pekerjaan ( D + E ) Rp. 82,335.23
G Dibulatkan Rp. 82,335.00

Analisa : AHSP A.0.0.24


Item : Pemasangan 1 m' Pipa PVC Kelas D Diameter 3"
Satuan : m'

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.081 Rp. 174,748.00 Rp. 14,154.59
Tukang Batu L.02 OH 0.135 Rp. 183,834.00 Rp. 24,817.59
Kepala Tukang L.03 OH 0.0135 Rp. 199,782.00 Rp. 2,697.06

Mandor L.04 OH 0.004 Rp. 211,379.00 Rp. 856.08

Jumlah Tenaga Kerja (A) Rp. 42,525.32


B BAHAN
Pipa PVC Ø 3" m' 1.200 Rp. 55,875.00 Rp. 67,050.00
Perlengkapan % 35% Rp. 55,875.00 Rp. 19,556.25

Jumlah Harga Bahan (B) Rp. 86,606.25


C PERALATAN
Jumlah Harga Alat (C) Rp -
D Jumlah ( A + B + C ) Rp. 129,131.57
E Overhead & Profit 10% x D Rp. 12,913.16
F Harga Satuan Pekerjaan ( D + E ) Rp. 142,044.73
G Dibulatkan Rp. 142,044.00

Analisa : AHSP A.5.5.1.32


Item : Pemasangan 1 m' Pipa PVC Tipe AW Diameter 4"
Satuan : m'

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA

Pekerja L.01 OH 0.081 Rp. 174,748.00 Rp. 14,154.59


Tukang Batu L.02 OH 0.135 Rp. 183,834.00 Rp. 24,817.59
Kepala Tukang L.03 OH 0.0135 Rp. 199,782.00 Rp. 2,697.06
Mandor L.04 OH 0.004 Rp. 211,379.00 Rp. 856.08
Jumlah Tenaga Kerja (A) Rp. 42,525.32
B BAHAN
Pipa PVC Ø 4" m' 1.200 Rp. 94,374.75 Rp. 113,249.70
Perlengkapan % 35% Rp. 94,374.75 Rp. 33,031.16

Jumlah Harga Bahan (B) Rp. 146,280.86


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 188,806.18
E Overhead & Profit 10% x D Rp. 18,880.62
F Harga Satuan Pekerjaan ( D + E ) Rp. 207,686.80
G Dibulatkan Rp. 207,686.00

Analisa : A. 4.6.1.13
Item : Pemasangan 1 m3 Konstruksi Kuda-Kuda Konvesional, Kayu Klas II
Satuan : m3

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA

Pekerja L.01 OH 4.000 Rp. 174,748.00 Rp. 698,992.00


Tukang Kayu L.02 OH 12.000 Rp. 183,834.00 Rp. 2,206,008.00
Kepala Tukang L.03 OH 1.2000 Rp. 199,782.00 Rp. 239,738.40
Mandor L.04 OH 0.200 Rp. 211,379.00 Rp. 42,275.80
Jumlah Tenaga Kerja (A) Rp. 3,187,014.20
B BAHAN
Kayu Kelas II (Kamper/Kruing/dll) m3 1.100 Rp. 5,500,000.00 Rp. 6,050,000.00
Besi Strip tebal 5 mm kg 15.000 Rp. 12,500.00 Rp. 187,500.00
Paku Biasa 5 cm - 12 cm kg 5.600 Rp. 20,000.00 Rp. 112,000.00

Jumlah Harga Bahan (B) Rp. 6,349,500.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 9,536,514.20
E Overhead & Profit 10% x D Rp. 953,651.42
F Harga Satuan Pekerjaan ( D + E ) Rp. 10,490,165.62
G Dibulatkan Rp. 10,490,165.00

Analisa : A. 4.6.1.26a
Item : Pemasangan 1 m2 dinding lambrisering dari papan kayu Klas II
Satuan : m2

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA

Pekerja L.01 OH 0.600 Rp. 174,748.00 Rp. 104,848.80


Tukang Kayu L.02 OH 1.800 Rp. 183,834.00 Rp. 330,901.20
Kepala Tukang L.03 OH 0.1800 Rp. 199,782.00 Rp. 35,960.76
Mandor L.04 OH 0.030 Rp. 211,379.00 Rp. 6,341.37
Jumlah Tenaga Kerja (A) Rp. 478,052.13
B BAHAN
Papan Kayu Kelas II m3 0.007 Rp. 5,500,000.00 Rp. 38,500.00
Paku Biasa 5 cm - 12 cm kg 0.100 Rp. 20,000.00 Rp. 2,000.00
Paku skrup 10 cm kg 0.150 Rp. 35,000.00 Rp. 5,250.00

Jumlah Harga Bahan (B) Rp. 45,750.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 523,802.13
E Overhead & Profit 10% x D Rp. 52,380.21
F Harga Satuan Pekerjaan ( D + E ) Rp. 576,182.34
G Dibulatkan Rp. 576,182.00

Analisa : A. 4.6.1.21a
Item : Pemasangan 1 m' Listplank ukuran (2 x 20) cm, Kayu Klas II
Satuan : m'

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA

Pekerja L.01 OH 0.100 Rp. 174,748.00 Rp. 17,474.80


Tukang Kayu L.02 OH 0.200 Rp. 183,834.00 Rp. 36,766.80
Kepala Tukang L.03 OH 0.0200 Rp. 199,782.00 Rp. 3,995.64
Mandor L.04 OH 0.005 Rp. 211,379.00 Rp. 1,056.90
Jumlah Tenaga Kerja (A) Rp. 59,294.14
B BAHAN
Papan Kayu Kelas II m3 0.011 Rp. 5,500,000.00 Rp. 59,400.00
Paku Biasa 5 cm - 12 cm kg 0.100 Rp. 20,000.00 Rp. 2,000.00

Jumlah Harga Bahan (B) Rp. 61,400.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 120,694.14
E Overhead & Profit 10% x D Rp. 12,069.41
F Harga Satuan Pekerjaan ( D + E ) Rp. 132,763.55
G Dibulatkan Rp. 132,763.00

Analisa : A. 4.5.2.39
Item : Pemasangan 1 m' Nok Atap Seng
Satuan : m'

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.150 Rp. 174,748.00 Rp. 26,212.20
Tukang Kayu L.02 OH 0.070 Rp. 183,834.00 Rp. 12,868.38
Kepala Tukang L.03 OH 0.0070 Rp. 199,782.00 Rp. 1,398.47
Mandor L.04 OH 0.006 Rp. 211,379.00 Rp. 1,268.27
Jumlah Tenaga Kerja (A) Rp. 41,747.33
B BAHAN
Seng Plat 3 x kk bjls 30 m3 0.300 Rp. 84,000.00 Rp. 25,200.00
Paku Seng kg 0.040 Rp. 18,450.00 Rp. 738.00

Jumlah Harga Bahan (B) Rp. 25,938.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 67,685.33
E Overhead & Profit 10% x D Rp. 6,768.53
F Harga Satuan Pekerjaan ( D + E ) Rp. 74,453.86
G Dibulatkan Rp. 74,453.00

Analisa : A. 4.5.2.38
Item : Pemasangan 1 m2 Atap Seng Gelombang
Satuan : m2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.120 Rp. 174,748.00 Rp. 20,969.76
Tukang Kayu L.02 OH 0.060 Rp. 183,834.00 Rp. 11,030.04
Kepala Tukang L.03 OH 0.0060 Rp. 199,782.00 Rp. 1,198.69
Mandor L.04 OH 0.006 Rp. 211,379.00 Rp. 1,268.27
Jumlah Tenaga Kerja (A) Rp. 34,466.77
B BAHAN
Seng Plat 2,8 x kk bjls 30 Lbr 0.700 Rp. 53,000.00 Rp. 37,100.00
Paku Seng kg 0.020 Rp. 13,000.00 Rp. 260.00

Jumlah Harga Bahan (B) Rp. 37,360.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 71,826.77
E Overhead & Profit 10% x D Rp. 7,182.68
F Harga Satuan Pekerjaan ( D + E ) Rp. 79,009.44
G Dibulatkan Rp. 79,009.00

Analisa : AHSP A.0.0.25


Item : Pemasangan Sink Royal SB62K
Satuan : bh

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.035 Rp. 174,748.00 Rp. 6,116.18
Tukang Batu L.02 OH 0.050 Rp. 183,834.00 Rp. 9,191.70
Kepala Tukang L.03 OH 0.008 Rp. 199,782.00 Rp. 1,498.37
Mandor L.04 OH 0.005 Rp. 211,379.00 Rp. 1,056.90
Jumlah Tenaga Kerja (A) Rp. 17,863.14
B BAHAN
Sink ROYAL SB62K bh 1.000 Rp. 610,000.00 Rp. 610,000.00

Jumlah Harga Bahan (B) Rp. 610,000.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 627,863.14
E Overhead & Profit 10% x D Rp. 62,786.31
F Harga Satuan Pekerjaan ( D + E ) Rp. 690,649.45
G Dibulatkan Rp. 690,649.00

Analisa : AHSP A.0.0.26


Item : Pemasangan Sink Royal SB42K
Satuan : bh
Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.035 Rp. 174,748.00 Rp. 6,116.18
Tukang Batu L.02 OH 0.050 Rp. 183,834.00 Rp. 9,191.70
Kepala Tukang L.03 OH 0.008 Rp. 199,782.00 Rp. 1,498.37
Mandor L.04 OH 0.005 Rp. 211,379.00 Rp. 1,056.90
Jumlah Tenaga Kerja (A) Rp. 17,863.14
B BAHAN
Sink ROYAL SB42K bh 1.000 Rp. 540,000.00 Rp. 540,000.00

Jumlah Harga Bahan (B) Rp. 540,000.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 557,863.14
E Overhead & Profit 10% x D Rp. 55,786.31
F Harga Satuan Pekerjaan ( D + E ) Rp. 613,649.45
G Dibulatkan Rp. 613,649.00

Analisa : AHSP A.0.0.27


Item : Pemasangan Kran Angsa
Satuan : bh

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.035 Rp. 174,748.00 Rp. 6,116.18
Tukang Batu L.02 OH 0.050 Rp. 183,834.00 Rp. 9,191.70
Kepala Tukang L.03 OH 0.008 Rp. 199,782.00 Rp. 1,498.37
Mandor L.04 OH 0.005 Rp. 211,379.00 Rp. 1,056.90
Jumlah Tenaga Kerja (A) Rp. 17,863.14
B BAHAN
Kran Angsa bh 1.000 Rp. 650,000.00 Rp. 650,000.00

Jumlah Harga Bahan (B) Rp. 650,000.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 667,863.14
E Overhead & Profit 10% x D Rp. 66,786.31
F Harga Satuan Pekerjaan ( D + E ) Rp. 734,649.45
G Dibulatkan Rp. 734,649.00

Analisa : AHSP A.0.0.28


Item : Pembongkaran Partisi Triplek
Satuan : m2

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.050 Rp. 174,748.00 Rp. 8,737.40
Mandor L.04 OH 0.010 Rp. 211,379.00 Rp. 2,113.79
Jumlah Tenaga Kerja (A) Rp. 10,851.19
B BAHAN
Rp -

Jumlah Harga Bahan (B) Rp -


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 10,851.19
E Overhead & Profit 10% x D Rp. 1,085.12
F Harga Satuan Pekerjaan ( D + E ) Rp. 11,936.31
G Dibulatkan Rp. 11,936.00

Analisa : AHSP A.0.0.29


Item : Pemasangan 1 m2 Atap Zincalume (Spandek)
Satuan : m2
Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.006 Rp. 174,748.00 Rp. 1,048.49
Tukang Kayu L.02 OH 0.120 Rp. 183,834.00 Rp. 22,060.08
Kepala Tukang L.03 OH 0.0600 Rp. 199,782.00 Rp. 11,986.92
Mandor L.04 OH 0.006 Rp. 211,379.00 Rp. 1,268.27
Jumlah Tenaga Kerja (A) Rp. 36,363.76
B BAHAN
Atap Apandek 0.30 mm m2 1.100 Rp. 49,000.00 Rp. 53,900.00
Paku skrup + Mur bh 6.000 Rp. 360.00 Rp. 2,160.00

Jumlah Harga Bahan (B) Rp. 56,060.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 92,423.76
E Overhead & Profit 10% x D Rp. 9,242.38
F Harga Satuan Pekerjaan ( D + E ) Rp. 101,666.14
G Dibulatkan Rp. 101,666.00

Analisa : AHSP A.0.0.30


Item : Pemasangan 1 m Kabel NYM 3x2,5
Satuan : m2

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.035 Rp. 174,748.00 Rp. 6,116.18
Mandor L.04 OH 0.001 Rp. 211,379.00 Rp. 211.38
Jumlah Tenaga Kerja (A) Rp. 6,327.56
B BAHAN
Kabel NYM 3x2,5 m 1.000 Rp. 9,113.70 Rp. 9,113.70

Jumlah Harga Bahan (B) Rp. 9,113.70


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 15,441.26
E Overhead & Profit 10% x D Rp. 1,544.13
F Harga Satuan Pekerjaan ( D + E ) Rp. 16,985.38
G Dibulatkan Rp. 16,985.00
Analisa : AHSP A.0.0.32
Item : Pekerjaan Tiang (Balok, Kolom)
Satuan : Kg

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.007 Rp. 174,748.00 Rp. 1,223.24
Tukang Besi OH 0.010 Rp. 183,834.00 Rp. 1,838.34
Kepala Tukang OH 0.004 Rp. 199,782.00 Rp. 799.13
Mandor L.04 OH 0.004 Rp. 211,379.00 Rp. 845.52
Jumlah Tenaga Kerja (A) Rp. 4,706.22
B BAHAN
Besi Holow 75x75x1,8 m 1.000 Rp. 16,842.31 Rp. 16,842.31

Jumlah Harga Bahan (B) Rp. 16,842.31


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 21,548.53
E Overhead & Profit 10% x D Rp. 2,154.85
F Harga Satuan Pekerjaan ( D + E ) Rp. 23,703.39
G Dibulatkan Rp. 23,703.00

Analisa : AHSP A.0.0.33


Item : Pekerjaan Kuda - Kuda
Satuan : Kg

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.007 Rp. 174,748.00 Rp. 1,223.24
Tukang Besi L02 OH 0.011 Rp. 183,834.00 Rp. 2,022.17
Kepala Tukang L03 OH 0.004 Rp. 199,782.00 Rp. 799.13
Mandor L.04 OH 0.004 Rp. 211,379.00 Rp. 845.52
Jumlah Tenaga Kerja (A) Rp. 4,890.05
B BAHAN
Pipa Besi Hitam 2' 1,7 m 1.000 Rp. 16,940.70 Rp. 16,940.70

Jumlah Harga Bahan (B) Rp. 16,940.70


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 21,830.75
E Overhead & Profit 0% x D Rp -
F Harga Satuan Pekerjaan ( D + E ) Rp. 21,830.75
G Dibulatkan Rp. 21,830.00

Analisa : AHSP A.0.0.34


Item : Pekerjaan Gording
Satuan : Kg

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.007 Rp. 174,748.00 Rp. 1,223.24
Tukang Besi L02 OH 0.011 Rp. 183,834.00 Rp. 2,022.17
Kepala Tukang L03 OH 0.004 Rp. 199,782.00 Rp. 799.13
Mandor L.04 OH 0.004 Rp. 211,379.00 Rp. 845.52
Jumlah Tenaga Kerja (A) Rp. 4,890.05
B BAHAN
Pipa Besi Hitam 1,5' 1,4 m 1.000 Rp. 18,006.61 Rp. 18,006.61

Jumlah Harga Bahan (B) Rp. 18,006.61


C PERALATAN
Jumlah Harga Alat (C) Rp -
D Jumlah ( A + B + C ) Rp. 22,896.66
E Overhead & Profit 0% x D Rp -
F Harga Satuan Pekerjaan ( D + E ) Rp. 22,896.66
G Dibulatkan Rp. 22,896.00

Analisa : AHSP A.0.0.35


Item : Pemasangan Angkur
Satuan : bh

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH - Rp. 174,748.00 Rp -
Tukang Besi L02 OH - Rp. 183,834.00 Rp -
Kepala Tukang L03 OH - Rp. 199,782.00 Rp -
Mandor L.04 OH - Rp. 211,379.00 Rp -
Jumlah Tenaga Kerja (A) Rp -
B BAHAN
Angkur L M16 X 400 bh 1.000 Rp. 21,800.00 Rp. 21,800.00

Jumlah Harga Bahan (B) Rp. 21,800.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 21,800.00
E Overhead & Profit 0% x D Rp -
F Harga Satuan Pekerjaan ( D + E ) Rp. 21,800.00
G Dibulatkan Rp. 21,800.00

Analisa : AHSP A.0.0.36


Item : Pemasangan Air Sementara
Satuan : bh

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Bor Pantek + Pemipaan dalm Sumur ls 30.000 Rp. 75,000.00 Rp. 2,250,000.00
Jumlah Tenaga Kerja (A) Rp. 2,250,000.00
B BAHAN
Pipa PVC 1" m1 30.000 Rp. 12,750.00 Rp. 382,500.00
Tengki Air Kapasitas 500 Ltr bh 1.000 Rp. 640,000.00 Rp. 640,000.00
Dudukan Tangki Air bh 1.000 Rp. 1,010,000.00 Rp. 1,010,000.00
Pompa Air unit 1.000 Rp. 275,000.00 Rp. 275,000.00

Jumlah Harga Bahan (B) Rp. 2,307,500.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 4,557,500.00
E Overhead & Profit 10% x D Rp. 455,750.00
F Harga Satuan Pekerjaan ( D + E ) Rp. 5,013,250.00
G Dibulatkan Rp. 5,013,250.00

Analisa : AHSP A.0.0.36


Item : Pemasangan Listrik Sementara Per Bulan
Satuan : ls

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Operator ls 45.000 Rp. 75,000.00 Rp. 3,375,000.00
Jumlah Tenaga Kerja (A) Rp. 3,375,000.00
B BAHAN
Sewa Generator bl 45.000 Rp - Rp -
Solar Industri ltr 2.000 Rp - Rp -

Jumlah Harga Bahan (B) Rp -


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 3,375,000.00
E Overhead & Profit 10% x D Rp. 337,500.00
F Harga Satuan Pekerjaan ( D + E ) Rp. 3,712,500.00
G Dibulatkan Rp. 3,712,500.00

Analisa : AHSP A.0.0.39


Item : Pemadatan Urugan
Satuan : ls

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja OH 0.150 Rp. 174,748.00 Rp. 26,212.20
Mandor OH 0.015 Rp. 211,379.00 Rp. 3,170.69
Jumlah Tenaga Kerja (A) Rp. 29,382.89
B BAHAN

Jumlah Harga Bahan (B) Rp -


C PERALATAN
Stemper hr 0.050 Rp. 550,000.00 Rp. 27,500.00

Jumlah Harga Alat (C) Rp. 27,500.00


D Jumlah ( A + B + C ) Rp. 56,882.89
E Overhead & Profit 0% x D Rp -
F Harga Satuan Pekerjaan ( D + E ) Rp. 56,882.89
G Dibulatkan Rp. 56,882.00

Analisa : AHSP A.0.0.40


Item : Pemasangan Box Panel MCB
Satuan : bh

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja OH 0.150 Rp. 174,748.00 Rp. 26,212.20
Mandor OH 0.015 Rp. 211,379.00 Rp. 3,170.69
Jumlah Tenaga Kerja (A) Rp. 29,382.89
B BAHAN
Box Panel MCB bh 1.000 Rp. 77,000.00 Rp. 77,000.00

Jumlah Harga Bahan (B) Rp. 77,000.00


C PERALATAN
Peralatan ls 100% Rp. 77,000.00 Rp. 77,000.00

Jumlah Harga Alat (C) Rp. 77,000.00


D Jumlah ( A + B + C ) Rp. 144,882.89
E Overhead & Profit 0% x D Rp -
F Harga Satuan Pekerjaan ( D + E ) Rp. 144,882.89
G Dibulatkan Rp. 144,882.00

Analisa : AHSP A.0.0.41


Item : Pemasangan 1 MCB
Satuan : bh
Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Upah OH 100% Rp. 53,543.70 Rp. 53,543.70

Jumlah Tenaga Kerja (A) Rp. 53,543.70


B BAHAN
MCB 6 A bh 1.000 Rp. 35,200.00 Rp. 35,200.00
Pipa Listrik 5/8 btg 3.000 Rp. 6,980.00 Rp. 20,940.00
T Dus bh 1.000 Rp. 700.00 Rp. 700.00
L Bow bh 2.000 Rp. 1,200.00 Rp. 2,400.00
Klem Biasa bh 24.000 Rp. 350.00 Rp. 8,400.00
Kabel m1 12.000 Rp. 9,113.70 Rp. 109,364.40

Jumlah Harga Bahan (B) Rp. 177,004.40


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 230,548.10
E Overhead & Profit 0% x D Rp -
F Harga Satuan Pekerjaan ( D + E ) Rp. 230,548.10
G Dibulatkan Rp. 230,548.00

Analisa : AHSP A.0.0.41


Item : Pemasangan 1M2 Geotekstil
Satuan : M2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.160 Rp. 174,748.00 Rp. 27,959.68
Tukang Tembok/ Gali OH 0.032 Rp. 183,834.00 Rp. 5,882.69
Mandor OH 0.016 Rp. 211,379.00 Rp. 3,382.06
Jumlah Tenaga Kerja (A) Rp. 33,842.37

B BAHAN
Geotekstil 150gr Non Woven M2 1.080 Rp. 8,000.00 Rp. 8,640.00
Jumlah Harga Bahan (B) Rp. 8,640.00
C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 42,482.37
E Overhead & Profit 10% x D Rp. 4,248.24
F Harga Satuan Pekerjaan ( D + E ) Rp. 46,730.60
G Dibulatkan Rp. 46,730.00

Analisa : AHSP A.0.0.41


Item : Pemasangan 1M2 Geogrid biaxial
Satuan : M2

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja OH 0.160 Rp. 174,748.00 Rp. 27,959.68
Tukang Tembok/ Gali OH 0.032 Rp. 183,834.00 Rp. 5,882.69
Mandor OH 0.016 Rp. 211,379.00 Rp. 3,382.06
Jumlah Tenaga Kerja (A) Rp. 33,842.37

B BAHAN
Geogrid biaxial 30kN M2 1.100 Rp. 18,200.00 Rp. 20,020.00
Jumlah Harga Bahan (B) Rp. 20,020.00
C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 53,862.37
E Overhead & Profit 10% x D Rp. 5,386.24
F Harga Satuan Pekerjaan ( D + E ) Rp. 59,248.60
G Dibulatkan Rp. 59,248.00

Analisa : AHSP A.0.0.41


Item : Pekerjaan Pengelasan Dengan Las Listrik
Satuan : CM2

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja OH 0.004 Rp. 174,748.00 Rp. 698.99
Tukang Besi OH 0.002 Rp. 183,834.00 Rp. 367.67
Kepala Tukang Besi OH 0.000 Rp. 199,782.00 Rp. 39.96
Mandor OH 0.000 Rp. 211,379.00 Rp. 42.28
Jumlah Tenaga Kerja (A) Rp. 1,066.66
B BAHAN
Kawat Las kg 0.04 Rp. 50,000.00 Rp. 2,000.00
Minyak Pelumas kaleng 0.004 Rp. 13,400.00 Rp. 53.60
Jumlah Harga Bahan (B) Rp. 2,053.60
C PERALATAN
Sewa Las Listrik unit/jam 0.017 Rp. 50,000.00 Rp. 850.00

Jumlah Harga Alat (C) Rp. 850.00


D Jumlah ( A + B + C ) Rp. 3,970.26
E Overhead & Profit 10% x D Rp. 397.03
F Harga Satuan Pekerjaan ( D + E ) Rp. 4,367.29
G Dibulatkan Rp. 4,367.00

Analisa : AHSP A.0.0.41


Item : Pembuatan direksikeet (kantor), los kerja, bedeng dan gudang
Satuan : M2

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja OH 1.000 Rp. 174,748.00 Rp. 174,748.00
Tukang kayu OH 2.000 Rp. 183,834.00 Rp. 367,668.00
Kepala Tukang Batu OH 0.200 Rp. 199,782.00 Rp. 39,956.40
Mandor OH 0.050 Rp. 211,379.00 Rp. 10,568.95
Jumlah Tenaga Kerja (A) Rp. 592,941.35
B BAHAN
Kaso 5/7 btg 1.250 Rp. 20,833.33 Rp. 26,041.67
Kayu Lapis lbr 1.350 Rp. 50,500.00 Rp. 68,175.00
Kayu Rimba campuran basah m3 0.189 Rp. 1,500,000.00 Rp. 283,500.00
Paku kg 0.300 Rp. 13,560.00 Rp. 4,068.00
Seng Gelombang m2 1.500 Rp. 13,560.00 Rp. 20,340.00
Batu kerikil m3 0.300 Rp. 250,000.00 Rp. 75,000.00
Pasir m3 0.100 Rp. 285,000.00 Rp. 28,500.00
Semen kg 10.500 Rp. 1,399.98 Rp. 14,699.74
Jumlah Harga Bahan (B) Rp. 520,324.40
C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 1,113,265.75
E Overhead & Profit 10% x D Rp. 111,326.58
F Harga Satuan Pekerjaan ( D + E ) Rp. 1,224,592.33
G Dibulatkan Rp. 1,224,592.00

Analisa : AHSP A.0.0.41


Item : Pekerjaan Bongkar Alumunium Composite (ACP)
Satuan : M2

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja OH 0.100 Rp. 174,748.00 Rp. 17,474.80
Tukang Besi OH 0.025 Rp. 183,834.00 Rp. 4,595.85
Kepala Tukang Besi OH 0.005 Rp. 199,782.00 Rp. 998.91
Mandor OH 0.003 Rp. 211,379.00 Rp. 634.14
Jumlah Tenaga Kerja (A) Rp. 23,703.70
B BAHAN
Jumlah Harga Bahan (B) Rp -
C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 23,703.70
E Overhead & Profit 10% x D Rp. 2,370.37
F Harga Satuan Pekerjaan ( D + E ) Rp. 26,074.07
G Dibulatkan Rp. 26,074.00

Analisa : AHSP A.0.0.41


Item : Pemasangan Alumunium Composite (ACP) dengan Rangka Hollow
Satuan : M2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.390 Rp. 174,748.00 Rp. 68,151.72
Tukang Besi OH 0.700 Rp. 183,834.00 Rp. 128,683.80
Kepala Tukang Besi OH 0.070 Rp. 199,782.00 Rp. 13,984.74
Mandor OH 0.007 Rp. 211,379.00 Rp. 1,479.65
Jumlah Tenaga Kerja (A) Rp. 212,299.91
B BAHAN
Alumunium Composite Panel m2 1.100 Rp. 200,000.00 Rp. 220,000.00
Hollow besi galvanis 4x4x1mm btg 0.800 Rp. 119,000.00 Rp. 95,200.00
Braket Siku / spigot / stiffener btg 0.297 Rp. 55,000.00 Rp. 16,335.00
Paku Skrup Beton kg 0.080 Rp. 50,000.00 Rp. 4,000.00
Paku Skrup kg 0.110 Rp. 25,000.00 Rp. 2,750.00
Sealant tube 0.250 Rp. 26,000.00 Rp. 6,500.00
Jumlah Harga Bahan (B) Rp. 344,785.00
C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 557,084.91
E Overhead & Profit 10% x D Rp. 55,708.49
F Harga Satuan Pekerjaan ( D + E ) Rp. 612,793.40
G Dibulatkan Rp. 612,793.00

Analisa : AHSP A.0.0.41


Item : Pemasangan Lapisan Almunium Foil
Satuan : M2

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja OH 0.150 Rp. 174,748.00 Rp. 26,212.20
Tukang kayu OH 0.050 Rp. 183,834.00 Rp. 9,191.70
Kepala Tukang OH 0.008 Rp. 199,782.00 Rp. 1,598.26
Mandor OH 0.005 Rp. 211,379.00 Rp. 1,056.90
Jumlah Tenaga Kerja (A) Rp. 38,059.05
B BAHAN
Alumunium Foil m2 1.1 Rp. 14,500.00 Rp. 15,950.00
Jumlah Harga Bahan (B) Rp. 15,950.00
C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 54,009.05
E Overhead & Profit 10% x D Rp. 5,400.91
F Harga Satuan Pekerjaan ( D + E ) Rp. 59,409.96
G Dibulatkan Rp. 59,409.00

Analisa : AHSP A.0.0.41


Item : Pekerjaan Bongkar Plafond existing
Satuan : m2

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja OH 0.040 Rp. 174,748.00 Rp. 6,989.92
Mandor OH 0.020 Rp. 211,379.00 Rp. 4,227.58
Jumlah Tenaga Kerja (A) Rp. 11,217.50
B BAHAN
Jumlah Harga Bahan (B) Rp -
C PERALATAN
Jumlah Harga Alat (C) Rp -
D Jumlah ( A + B + C ) Rp. 11,217.50
E Overhead & Profit 10% x D Rp. 1,121.75
F Harga Satuan Pekerjaan ( D + E ) Rp. 12,339.25
G Dibulatkan Rp. 12,339.00

Analisa : AHSP A.0.0.41


Item : Pekerjaan Pemasangan Plafond pvc dengan rangka Hollow dan list Pvc
Satuan : M2

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja OH 0.100 Rp. 174,748.00 Rp. 17,474.80
Tukang Besi OH 0.100 Rp. 183,834.00 Rp. 18,383.40
Kepala Tukang Besi OH 0.010 Rp. 199,782.00 Rp. 1,997.82
Mandor OH 0.005 Rp. 211,379.00 Rp. 1,056.90
Jumlah Tenaga Kerja (A) Rp. 38,912.91
B BAHAN
Plafond PVC lebar 20cm, T.8mm m2 1.665 Rp. 30,000.00 Rp. 49,950.00
Rangka Plafond Hollow 40x40 btg 1.250 Rp. 18,500.00 Rp. 23,125.00
List Plafond PVC m1 4.000 Rp. 20,000.00 Rp. 80,000.00
Paku Skrup kg 0.110 Rp. 25,000.00 Rp. 2,750.00
Jumlah Harga Bahan (B) Rp. 155,825.00
C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 194,737.91
E Overhead & Profit 10% x D Rp. 19,473.79
F Harga Satuan Pekerjaan ( D + E ) Rp. 214,211.71
G Dibulatkan Rp. 214,211.00

Analisa : AHSP A.0.0.41


Item : Pekerjaan bongkar tangga cat ladder
Satuan : m2
Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja OH 0.160 Rp. 174,748.00 Rp. 27,959.68
Mandor OH 0.040 Rp. 211,379.00 Rp. 8,455.16
Jumlah Tenaga Kerja (A) Rp. 36,414.84
B BAHAN
Jumlah Harga Bahan (B) Rp -
C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 36,414.84
E Overhead & Profit 10% x D Rp. 3,641.48
F Harga Satuan Pekerjaan ( D + E ) Rp. 40,056.32
G Dibulatkan Rp. 40,056.00

Analisa : AHSP A.0.0.41


Item : Pekerjaan pembongkaran dan pemasangan kembali titik lampu existing
Satuan : titik

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja OH 0.334 Rp. 174,748.00 Rp. 58,365.83
Tukang Listrik OH 0.420 Rp. 183,834.00 Rp. 77,210.28
Mandor OH 0.180 Rp. 211,379.00 Rp. 38,048.22
Jumlah Tenaga Kerja (A) Rp. 173,624.33
B BAHAN
Jumlah Harga Bahan (B) Rp -
C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 173,624.33
E Overhead & Profit 10% x D Rp. 17,362.43
F Harga Satuan Pekerjaan ( D + E ) Rp. 190,986.77
G Dibulatkan Rp. 190,986.00
Analisa : AHSP A.0.0.41
Item : Pemasangan Lampu led strip neon flex
Satuan : m1

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja OH 0.020 Rp. 174,748.00 Rp. 3,494.96
Tukang Listrik OH 0.200 Rp. 183,834.00 Rp. 36,766.80
Mandor OH 0.005 Rp. 211,379.00 Rp. 1,056.90
Jumlah Tenaga Kerja (A) Rp. 41,318.66
B BAHAN
Lampu LED strip ip65 Flexible m 1.000 Rp. 10,000.00 Rp. 10,000.00
Driver bh 0.125 Rp. 20,000.00 Rp. 2,500.00
Material Bantu ls 1.000 Rp. 5,000.00 Rp. 5,000.00
Jumlah Harga Bahan (B) Rp. 17,500.00
C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 58,818.66
E Overhead & Profit 10% x D Rp. 5,881.87
F Harga Satuan Pekerjaan ( D + E ) Rp. 64,700.52
G Dibulatkan Rp. 64,700.00

Analisa : AHSP A.0.0.21


Item : Pengecatan 1 m2 Permukaan baja dengan menie Besi (zincromate)
Satuan : m2

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.020 Rp. 174,748.00 Rp. 3,494.96
Tuakng Cat OH 0.200 Rp. 183,834.00 Rp. 36,766.80
Kepala Tukang L.03 OH 0.020 Rp. 199,782.00 Rp. 3,995.64
Mandor L.04 OH 0.003 Rp. 211,379.00 Rp. 528.45
Jumlah Tenaga Kerja (A) Rp. 44,785.85
B BAHAN
Cat Menie besi kg 0.100 Rp. 49,500.00 Rp. 4,950.00
Kuas 4' bh 0.010 Rp. 3,500.00 Rp. 35.00
Pengencer ltr 0.010 Rp. 15,000.00 Rp. 150.00
Ampelas lbr 0.020 Rp. 5,000.00 Rp. 100.00
Jumlah Harga Bahan (B) Rp. 5,235.00
C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 50,020.85
E Overhead & Profit 10% x D Rp. 5,002.08
F Harga Satuan Pekerjaan ( D + E ) Rp. 55,022.93
G Dibulatkan Rp. 55,022.00

Analisa : AHSP A.0.0.21


Item : Pengecatan 1 m2 Permukaan baja secara semprot
Satuan : m2

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.100 Rp. 174,748.00 Rp. 17,474.80
Tuakng Cat OH 0.250 Rp. 183,834.00 Rp. 45,958.50
Kepala Tukang L.03 OH 0.070 Rp. 199,782.00 Rp. 13,984.74
Mandor L.04 OH 0.020 Rp. 211,379.00 Rp. 4,227.58
Jumlah Tenaga Kerja (A) Rp. 81,645.62
B BAHAN
Cat Dasar kg 0.100 Rp. 68,000.00 Rp. 6,800.00
Pengencer ltr 0.010 Rp. 15,500.00 Rp. 155.00
Jumlah Harga Bahan (B) Rp. 6,955.00
C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 88,600.62
E Overhead & Profit 10% x D Rp. 8,860.06
F Harga Satuan Pekerjaan ( D + E ) Rp. 97,460.68
G Dibulatkan Rp. 97,460.00

Analisa : AHSP A.0.0.21


Item : Pengukuran Lahan Vertikal dan Horizontal
Satuan : m2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.001 Rp. 174,748.00 Rp. 174.75
Juru Ukur OH 0.002 Rp. 211,379.00 Rp. 422.76
Operator Pompa OH 0.002 Rp. 211,379.00 Rp. 317.07
Jumlah Tenaga Kerja (A) Rp. 914.57
B BAHAN
Rp -
Jumlah Harga Bahan (B) Rp -
C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 914.57
E Overhead & Profit 10% x D Rp. 91.46
F Harga Satuan Pekerjaan ( D + E ) Rp. 1,006.03
G Dibulatkan Rp. 1,006.00

Analisa : AHSP A.0.0.41


Item : Pagar pengaman dengan seng gelombang tinggi 1,8 M dengan rangka kayu
Satuan : m1

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.036 Rp. 174,748.00 Rp. 6,290.93
Tukang Kayu OH 0.060 Rp. 183,834.00 Rp. 11,030.04
Kepala Tukang Kayu OH 0.006 Rp. 199,782.00 Rp. 1,198.69
Mandor OH 0.002 Rp. 211,379.00 Rp. 380.48
Jumlah Tenaga Kerja (A) Rp. 18,900.14
B BAHAN
Kaso 5/7 m3 0.035 Rp. 1,500,000.00 Rp. 52,500.00
Paku kg 0.420 Rp. 13,560.00 Rp. 5,695.20
Seng Gelombang lbr 1.200 Rp. 53,500.00 Rp. 64,200.00
Pasir m3 0.100 Rp. 285,000.00 Rp. 28,500.00
Semen zak 0.300 Rp. 69,998.75 Rp. 20,999.63
Jumlah Harga Bahan (B) Rp. 171,894.83
C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 190,794.97
E Overhead & Profit 10% x D Rp. 19,079.50
F Harga Satuan Pekerjaan ( D + E ) Rp. 209,874.46
G Dibulatkan Rp. 209,874.00

Analisa : AHSP A.0.0.21


Item : Pembersihan lapangan dan perataan
Satuan : m2

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja OH 0.100 Rp. 174,748.00 Rp. 17,474.80
Mandor OH 0.050 Rp. 211,379.00 Rp. 10,568.95
Jumlah Tenaga Kerja (A) Rp. 28,043.75
B BAHAN
Rp -
Jumlah Harga Bahan (B) Rp -
C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 28,043.75
E Overhead & Profit 10% x D Rp. 2,804.38
F Harga Satuan Pekerjaan ( D + E ) Rp. 30,848.13
G Dibulatkan Rp. 30,848.00

Analisa : AHSP A.0.0.21


Item : Pemotongan Pohon Existing
Satuan : buah

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja OH 0.100 Rp. 174,748.00 Rp. 17,474.80
Mandor OH 0.050 Rp. 211,379.00 Rp. 10,568.95
Jumlah Tenaga Kerja (A) Rp. 28,043.75
B BAHAN
Rp -
Jumlah Harga Bahan (B) Rp -
C PERALATAN
Sewa Dumpt ruck unit/jam 0.240 Rp 250,000 Rp. 60,000.00
Sewa chain saw unit/jam 0.500 Rp 37,500 Rp. 18,750.00
Jumlah Harga Alat (C) Rp. 78,750.00
D Jumlah ( A + B + C ) Rp. 106,793.75
E Overhead & Profit 10% x D Rp. 10,679.38
F Harga Satuan Pekerjaan ( D + E ) Rp. 117,473.13
G Dibulatkan Rp. 117,473.00

Analisa : AHSP A.0.0.21


Item : Angkut sampah ex Pemotongan Pohon Existing
Satuan : buah

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja OH 1.500 Rp. 174,748.00 Rp. 262,122.00
Mandor OH 0.150 Rp. 211,379.00 Rp. 31,706.85
Jumlah Tenaga Kerja (A) Rp. 293,828.85
B BAHAN
Rp -
Jumlah Harga Bahan (B) Rp -
C PERALATAN
Sewa Dumpt ruck unit/jam 0.150 Rp 250,000 Rp. 37,500.00
Rp -
Jumlah Harga Alat (C) Rp. 37,500.00
D Jumlah ( A + B + C ) Rp. 331,328.85
E Overhead & Profit 10% x D Rp. 33,132.89
F Harga Satuan Pekerjaan ( D + E ) Rp. 364,461.74
G Dibulatkan Rp. 364,461.00

Analisa : AHSP A.0.0.21


Item : Pemasangan Geotekstil
Satuan : m2

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja OH 0.160 Rp. 174,748.00 Rp. 27,959.68
Tukang Gali OH 0.032 Rp. 183,834.00 Rp. 5,882.69
Mandor OH 0.016 Rp. 211,379.00 Rp. 3,382.06
Jumlah Tenaga Kerja (A) Rp. 37,224.43
B BAHAN
Geotekstil Non-woven 150gr m2 1.080 Rp. 8,000.00 Rp. 8,640.00
Jumlah Harga Bahan (B) Rp. 8,640.00
C PERALATAN
Rp -
Jumlah Harga Alat (C) Rp -
D Jumlah ( A + B + C ) Rp. 45,864.43
E Overhead & Profit 10% x D Rp. 4,586.44
F Harga Satuan Pekerjaan ( D + E ) Rp. 50,450.88
G Dibulatkan Rp. 50,450.00

Analisa : AHSP A.0.0.21


Item : Pemasangan Bronjong / Batu Pecah
Satuan : m3

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja OH 0.500 Rp. 174,748.00 Rp. 87,374.00
Mandor OH 0.050 Rp. 211,379.00 Rp. 10,568.95
Jumlah Tenaga Kerja (A) Rp. 97,942.95
B BAHAN
Kawat Bronjong unit 1.000 Rp 150,000.00 Rp. 150,000.00
Batu Pecah m3 1.400 Rp. 250,000.00 Rp. 350,000.00
Jumlah Harga Bahan (B) Rp. 350,000.00
C PERALATAN
Rp -
Jumlah Harga Alat (C) Rp -
D Jumlah ( A + B + C ) Rp. 522,942.95
E Overhead & Profit 10% x D Rp. 52,294.30
F Harga Satuan Pekerjaan ( D + E ) Rp. 575,237.25
G Dibulatkan Rp. 575,237.00

Analisa : AHSP A.0.0.21


Item : Pekerjaan Pasang Pipa Galvanis Dia 2"
Satuan : m1

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.108 174748 Rp 18,873
Tukang Pipa OH 0.108 183834 Rp 19,854
Kepala Tukang Pipa OH 0.018 Rp. 199,782.00 Rp 3,596
Mandor OH 0.005 Rp. 211,379.00 Rp 1,141
Jumlah Tenaga Kerja (A) Rp. 43,464.38
B BAHAN
Pipa Galvanis btg 0.200 Rp 357,000.00 Rp. 71,400.00
Perlengkapan Pipa Galvanis set 0.350 Rp. 107,100.00 Rp. 37,485.00
Jumlah Harga Bahan (B) Rp. 108,885.00
C PERALATAN
Rp -
Jumlah Harga Alat (C) Rp -
D Jumlah ( A + B + C ) Rp. 152,349.38
E Overhead & Profit 10% x D Rp. 15,234.94
F Harga Satuan Pekerjaan ( D + E ) Rp. 167,584.32
G Dibulatkan Rp. 167,584.00
Analisa : AHSP A.0.0.21
Item : Pekerjaan Pemasangan besi plat
Satuan : kg

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.003 Rp 174,748 Rp 524
Tukang Las OH 0.021 Rp 183,834 Rp 3,861
Jumlah Tenaga Kerja (A) Rp. 4,384.76
B BAHAN
Besi plat hitam kg 1.150 Rp 17,257.14 Rp. 19,845.71
Jumlah Harga Bahan (B) Rp. 19,845.71
C PERALATAN
Rp -
Jumlah Harga Alat (C) Rp -
D Jumlah ( A + B + C ) Rp. 24,230.47
E Overhead & Profit 10% x D Rp. 2,423.05
F Harga Satuan Pekerjaan ( D + E ) Rp. 26,653.52
G Dibulatkan Rp. 26,653.00

Analisa : AHSP A.0.0.21


Item : Pengangkutan Material / Hasil Galian Sejauh 3-5 M
Satuan : m3

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja OH 0.2480 Rp 174,748 Rp 43,338
Mandor OH 0.0124 Rp 211,379 Rp 2,621
Jumlah Tenaga Kerja (A) Rp. 45,958.60
B BAHAN
Rp -
Jumlah Harga Bahan (B) Rp -
C PERALATAN
Rp -
Jumlah Harga Alat (C) Rp -
D Jumlah ( A + B + C ) Rp. 45,958.60
E Overhead & Profit 10% x D Rp. 4,595.86
F Harga Satuan Pekerjaan ( D + E ) Rp. 50,554.46
G Dibulatkan Rp. 50,554.00

Analisa : AHSP A.0.0.21


Item : Pengurugan dengan material urug biasa / puing
Satuan : m3

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.3000 Rp 174,748 Rp 52,424
Mandor OH 0.01 Rp 211,379 Rp 2,114
Jumlah Tenaga Kerja (A) Rp. 54,538.19
B BAHAN
Material urug / Puing m3 1.000 Rp 100,000.00 Rp. 100,000.00
Jumlah Harga Bahan (B) Rp. 100,000.00
C PERALATAN
Rp -
Jumlah Harga Alat (C) Rp -
D Jumlah ( A + B + C ) Rp. 154,538.19
E Overhead & Profit 10% x D Rp. 15,453.82
F Harga Satuan Pekerjaan ( D + E ) Rp. 169,992.01
G Dibulatkan Rp. 169,992.00
Analisa : AHSP A.0.0.21
Item : Pasang Plastik Cor
Satuan : m2

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja OH 0.0066 Rp 174,748 Rp 1,153
Mandor OH 0.0033 Rp 211,379 Rp 698
Jumlah Tenaga Kerja (A) Rp. 1,850.89
B BAHAN
Plastik Cor Tebal 0,6mm kg 0.320 Rp 10,198.43 Rp. 3,263.50
Jumlah Harga Bahan (B) Rp. 3,263.50
C PERALATAN
Rp -
Jumlah Harga Alat (C) Rp -
D Jumlah ( A + B + C ) Rp. 5,114.38
E Overhead & Profit 10% x D Rp. 511.44
F Harga Satuan Pekerjaan ( D + E ) Rp. 5,625.82
G Dibulatkan Rp. 5,625.00

Analisa : AHSP A.0.0.21


Item : Pekerjaan pemasangan Batu Andesit
Satuan : m2

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja OH 0.7000 Rp 174,748 Rp 122,324
Tukang Batu OH 0.3500 Rp 183,834 Rp 64,342
Kepala Tukang OH 0.0350 Rp 199,782 Rp 6,992
Mandor OH 0.035 Rp 211,379 Rp 7,398
Jumlah Tenaga Kerja (A) Rp. 201,056.14
B BAHAN
Batu Andesit Bakar m2 1.100 Rp 169,000 Rp 185,900
Pasir m3 0.035 Rp 221,286 Rp 7,745
Semen zak 0.294 Rp 1,400 Rp 411
Jumlah Harga Bahan (B) Rp. 194,056.24
C PERALATAN
Rp -
Jumlah Harga Alat (C) Rp -
D Jumlah ( A + B + C ) Rp. 395,112.38
E Overhead & Profit 10% x D Rp. 39,511.24
F Harga Satuan Pekerjaan ( D + E ) Rp. 434,623.62
G Dibulatkan Rp. 434,623.00

Analisa : AHSP A.0.0.21


Item : Pekerjaan Coating Batu Alam
Satuan : m2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.2000 Rp 174,748 Rp 34,950
Tukang Batu OH 0.0200 Rp 183,834 Rp 3,677
Kepala Tukang OH 0.0030 Rp 199,782 Rp 599
Mandor OH 0.00055 Rp 211,379 Rp 116
Jumlah Tenaga Kerja (A) Rp. 39,341.88
B BAHAN
Thinner ltr 0.330 Rp 15,500 Rp 5,115
Coating Batu Alam kg 0.250 Rp 36,900 Rp 9,225
Jumlah Harga Bahan (B) Rp. 14,340.00
C PERALATAN
Rp -
Jumlah Harga Alat (C) Rp -
D Jumlah ( A + B + C ) Rp. 53,681.88
E Overhead & Profit 10% x D Rp. 5,368.19
F Harga Satuan Pekerjaan ( D + E ) Rp. 59,050.07
G Dibulatkan Rp. 59,050.00

Analisa : AHSP A.0.0.21


Item : Pekerjaan Pemasangan Floordeck
Satuan : m2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.120 Rp 174,748 Rp 20,970
Tukang Batu OH 0.120 Rp 183,834 Rp 22,060
Kepala Tukang OH 0.012 Rp 199,782 Rp 2,397
Mandor OH 0.006 Rp 211,379 Rp 1,268
Jumlah Tenaga Kerja (A) Rp. 46,695.50
B BAHAN
Plat Floordeck m2 0.330 Rp 125,000 Rp 41,250

Jumlah Harga Bahan (B) Rp. 41,250.00


C PERALATAN
Rp -
Jumlah Harga Alat (C) Rp -
D Jumlah ( A + B + C ) Rp. 87,945.50
E Overhead & Profit 10% x D Rp. 8,794.55
F Harga Satuan Pekerjaan ( D + E ) Rp. 96,740.05
G Dibulatkan Rp. 96,740.00

Analisa : AHSP A.0.0.21


Item : Pekerjaan Waterproffing
Satuan : m2

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja OH 0.100 Rp 174,748 Rp 17,475
Tukang Batu OH 0.200 Rp 183,834 Rp 36,767
Kepala Tukang OH 0.020 Rp 199,782 Rp 3,996
Mandor OH 0.010 Rp 211,379 Rp 2,114
Jumlah Tenaga Kerja (A) Rp. 60,351.03
B BAHAN
Water Proofing Sika Top kg 2.500 Rp 12,596 Rp 31,490
Kuas Cat bh 0.200 Rp 5,300 Rp 1,060
Jumlah Harga Bahan (B) Rp. 32,550.00
C PERALATAN
Rp -
Jumlah Harga Alat (C) Rp -
D Jumlah ( A + B + C ) Rp. 92,901.03
E Overhead & Profit 10% x D Rp. 9,290.10
F Harga Satuan Pekerjaan ( D + E ) Rp. 102,191.13
G Dibulatkan Rp. 102,191.00

Analisa : AHSP A.0.0.21


Item : Pekerjaan Pemasangan Instalasi Lampu
Satuan : titik

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja OH 0.050 Rp 174,748 Rp 8,737
Tukang Listrik OH 0.020 Rp 183,834 Rp 3,677
Kepala Tukang OH 0.100 Rp 199,782 Rp 19,978
Mandor OH 0.100 Rp 211,379 Rp 21,138
Jumlah Tenaga Kerja (A) Rp. 53,530.18
B BAHAN
Kabel NYM 3x2,5mm m 17.000 Rp 9,114 Rp 154,932.900
Pipa conduit btg 3.000 Rp 6,980 Rp 20,940.000
Klem Pipa buah 24.000 Rp 350 Rp 8,400.000
T-doos buah 3.000 Rp 700 Rp 2,100.000
L bow buah 4.000 Rp 1,200 Rp 4,800.000
Las Dop buah 3.000 Rp 205 Rp 615.000
Mangkok buah 1.000 Rp 25,000 Rp 25,000.000
Saklar buah 1.000 Rp 10,980 Rp 10,980.000
Fitting buah 1.000 Rp 7,000 Rp 7,000.000
Jumlah Harga Bahan (B) Rp. 227,767.90
C PERALATAN
Rp -
Jumlah Harga Alat (C) Rp -
D Jumlah ( A + B + C ) Rp. 284,798.08
E Overhead & Profit 10% x D Rp. 28,479.81
F Harga Satuan Pekerjaan ( D + E ) Rp. 313,277.89
G Dibulatkan Rp. 313,277.00

Analisa : AHSP A.0.0.21


Item : Pekerjaan Pemasangan Pipa PVC AW Diameter 4
Satuan : m1

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.081 Rp 174,748 Rp 14,155
Tukang Pipa OH 0.135 Rp 183,834 Rp 24,818
Kepala Tukang OH 0.014 Rp 199,782 Rp 2,697
Mandor OH 0.004 Rp 211,379 Rp 867
Jumlah Tenaga Kerja (A) Rp. 42,535.89
B BAHAN
Pipa PVC Dia.4 Rucika btg 0.300 Rp 305,000 Rp 91,500.000
Perlengkapan Pipa PVC AW 4 set 0.350 Rp 76,250 Rp 26,687.500
Jumlah Harga Bahan (B) Rp. 118,187.50
C PERALATAN
Rp -
Jumlah Harga Alat (C) Rp -
D Jumlah ( A + B + C ) Rp. 160,723.39
E Overhead & Profit 10% x D Rp. 16,072.34
F Harga Satuan Pekerjaan ( D + E ) Rp. 176,795.73
G Dibulatkan Rp. 176,795.00

Analisa : AHSP A.0.0.21


Item : Pekerjaan Pemasangan Pipa PVC AW Diameter 1 1/2 Inch
Satuan : m1

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.036 Rp 174,748 Rp 6,291
Tukang Pipa OH 0.060 Rp 183,834 Rp 11,030
Kepala Tukang OH 0.006 Rp 199,782 Rp 1,199
Mandor OH 0.002 Rp 211,379 Rp 380
Jumlah Tenaga Kerja (A) Rp. 18,900.14
B BAHAN
Pipa PVC Dia.1 1/2 Rucika btg 0.300 Rp 82,474 Rp 24,742.200
Perlengkapan Pipa set 0.350 Rp 20,619 Rp 7,216.475
Jumlah Harga Bahan (B) Rp. 31,958.68
C PERALATAN
Rp -
Jumlah Harga Alat (C) Rp -
D Jumlah ( A + B + C ) Rp. 50,858.82
E Overhead & Profit 10% x D Rp. 5,085.88
F Harga Satuan Pekerjaan ( D + E ) Rp. 55,944.70
G Dibulatkan Rp. 55,944.00

Analisa : AHSP A.0.0.21


Item : Pekerjaan Pemasangan Pipa PVC AW Diameter 2 Inch
Satuan : m1
Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja OH 0.054 Rp 174,748 Rp 9,436
Tukang Pipa OH 0.090 Rp 183,834 Rp 16,545
Kepala Tukang OH 0.009 Rp 199,782 Rp 1,798
Mandor OH 0.003 Rp 211,379 Rp 571
Jumlah Tenaga Kerja (A) Rp. 28,350.21
B BAHAN
Pipa PVC Dia.2 Rucika btg 0.300 Rp 96,000 Rp 28,800.000
Perlengkapan Pipa set 0.350 Rp 24,000 Rp 8,400.000
Jumlah Harga Bahan (B) Rp. 37,200.00
C PERALATAN
Rp -
Jumlah Harga Alat (C) Rp -
D Jumlah ( A + B + C ) Rp. 65,550.21
E Overhead & Profit 10% x D Rp. 6,555.02
F Harga Satuan Pekerjaan ( D + E ) Rp. 72,105.23
G Dibulatkan Rp. 72,105.00

Analisa : AHSP A.0.0.21


Item : Pekerjaan Pemasangan Pipa PVC AW Diameter 3 Inch
Satuan : m1

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.081 Rp 174,748 Rp 14,155
Tukang Pipa OH 0.135 Rp 183,834 Rp 24,818
Kepala Tukang OH 0.014 Rp 199,782 Rp 2,697
Mandor OH 0.004 Rp 211,379 Rp 867
Jumlah Tenaga Kerja (A) Rp. 42,535.89
B BAHAN
Pipa PVC Dia.3 Rucika btg 0.300 Rp 195,000 Rp 58,500.000
Perlengkapan Pipa set 0.350 Rp 48,750 Rp 17,062.500
Jumlah Harga Bahan (B) Rp. 75,562.50
C PERALATAN
Rp -
Jumlah Harga Alat (C) Rp -
D Jumlah ( A + B + C ) Rp. 118,098.39
E Overhead & Profit 10% x D Rp. 11,809.84
F Harga Satuan Pekerjaan ( D + E ) Rp. 129,908.23
G Dibulatkan Rp. 129,908.00

Analisa : AHSP A.0.0.21


Item : Pekerjaan Pemasangan Pipa PVC AW Diameter 1 Inch
Satuan : m1

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.036 Rp 174,748 Rp 6,291
Tukang Pipa OH 0.060 Rp 183,834 Rp 11,030
Kepala Tukang OH 0.006 Rp 199,782 Rp 1,199
Mandor OH 0.002 Rp 211,379 Rp 380
Jumlah Tenaga Kerja (A) Rp. 18,900.14
B BAHAN
Pipa PVC Dia.1 Rucika btg 0.300 Rp 48,110 Rp 14,433.000
Perlengkapan Pipa set 0.350 Rp 12,028 Rp 4,209.625
Jumlah Harga Bahan (B) Rp. 18,642.63
C PERALATAN
Rp -
Jumlah Harga Alat (C) Rp -
D Jumlah ( A + B + C ) Rp. 37,542.77
E Overhead & Profit 10% x D Rp. 3,754.28
F Harga Satuan Pekerjaan ( D + E ) Rp. 41,297.04
G Dibulatkan Rp. 41,297.00
Analisa : AHSP A.0.0.21
Item : Pekerjaan Pemasangan Pipa PVC AW Diameter 3/4 Inch
Satuan : m1

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja OH 0.036 Rp 174,748 Rp 6,291
Tukang Pipa OH 0.060 Rp 183,834 Rp 11,030
Kepala Tukang OH 0.006 Rp 199,782 Rp 1,199
Mandor OH 0.002 Rp 211,379 Rp 380
Jumlah Tenaga Kerja (A) Rp. 18,900.14
B BAHAN
Pipa PVC Dia. 3/4Rucika btg 0.300 Rp 33,000 Rp 9,900.000
Perlengkapan Pipa set 0.350 Rp 8,250 Rp 2,887.500
Jumlah Harga Bahan (B) Rp. 12,787.50
C PERALATAN
Rp -
Jumlah Harga Alat (C) Rp -
D Jumlah ( A + B + C ) Rp. 31,687.64
E Overhead & Profit 10% x D Rp. 3,168.76
F Harga Satuan Pekerjaan ( D + E ) Rp. 34,856.41
G Dibulatkan Rp. 34,856.00

Analisa : AHSP A.0.0.21


Item : Pekerjaan Pemasangan Pipa PVC AW Diameter 1/2 Inch
Satuan : m1

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja OH 0.036 Rp 174,748 Rp 6,291
Tukang Pipa OH 0.060 Rp 183,834 Rp 11,030
Kepala Tukang OH 0.006 Rp 199,782 Rp 1,199
Mandor OH 0.002 Rp 211,379 Rp 380
Jumlah Tenaga Kerja (A) Rp. 18,900.14
B BAHAN
Pipa PVC Dia. 1/2Rucika btg 0.300 Rp 25,942 Rp 7,782.600
Perlengkapan Pipa set 0.350 Rp 6,486 Rp 2,269.925
Jumlah Harga Bahan (B) Rp. 10,052.53
C PERALATAN
Rp -
Jumlah Harga Alat (C) Rp -
D Jumlah ( A + B + C ) Rp. 28,952.67
E Overhead & Profit 10% x D Rp. 2,895.27
F Harga Satuan Pekerjaan ( D + E ) Rp. 31,847.93
G Dibulatkan Rp. 31,847.00

Analisa : AHSP A.0.0.21


Item : Pengadaan dan Pemasangan Besi Siku (menara air)
Satuan : kg

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.069 Rp 174,748 Rp 12,058
Tukang Besi OH 0.069 Rp 183,834 Rp 12,685
Kepala Tukang OH 0.007 Rp 199,782 Rp 1,378
Mandor OH 0.003 Rp 211,379 Rp 729
Jumlah Tenaga Kerja (A) Rp. 26,849.91
B BAHAN
Besi Siku kg 1.150 Rp 8,690 Rp 9,993.103
Rp -
Jumlah Harga Bahan (B) Rp. 9,993.10
C PERALATAN
Rp -
Jumlah Harga Alat (C) Rp -
D Jumlah ( A + B + C ) Rp. 36,843.01
E Overhead & Profit 10% x D Rp. 3,684.30
F Harga Satuan Pekerjaan ( D + E ) Rp. 40,527.32
G Dibulatkan Rp. 40,527.00

Analisa : AHSP A.0.0.21


Item : Pekerjaan Pemasangan Kawat Harmonika
Satuan : m2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.144 Rp 174,748 Rp 25,241
Tukang Besi OH 0.022 Rp 183,834 Rp 4,085
Tukang Kayu OH 0.100 Rp 183,834 Rp 18,383
Kepala tukang besi OH 0.002 Rp 199,782 Rp 444
Kepala Tukang Kayu OH 0.010 Rp 199,782 Rp 1,998
Mandor OH 0.003 Rp 211,379 Rp 575
Jumlah Tenaga Kerja (A) Rp. 50,725.08
B BAHAN
Plat Strip kg 1.716 Rp 13,000 Rp 22,308.000
Kawat Las kg 0.444 Rp 50,000 Rp 22,200.000
Kawat m2 1.100 Rp 25,000 Rp 27,500.000
Minyak Pelumas kaleng 0.044 Rp 25,000 Rp 1,110.000
Jumlah Harga Bahan (B) Rp. 73,118.00
C PERALATAN
Sewa Welding set unit/hari 0.189 Rp 350,000 Rp. 66,104.50
Jumlah Harga Alat (C) Rp. 66,104.50
D Jumlah ( A + B + C ) Rp. 189,947.58
E Overhead & Profit 10% x D Rp. 18,994.76
F Harga Satuan Pekerjaan ( D + E ) Rp. 208,942.34
G Dibulatkan Rp. 208,942.00

Analisa : AHSP A.0.0.21


Item : Pekerjaan Pemasangan Kanstin DKI
Satuan : m1

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.099 Rp 174,748 Rp 17,230
Tukang Batu OH 0.009 Rp 183,834 Rp 1,728
Kepala Tukang Batu OH 0.001 Rp 199,782 Rp 180
Mandor OH 0.028 Rp 211,379 Rp 5,813
Jumlah Tenaga Kerja (A) Rp. 24,950.92
B BAHAN
Semen zak 0.010 Rp 46,750 Rp 453.475
Pasir m3 0.002 Rp 221,286 Rp 331.929
Kanstin m3 1.600 Rp 150,000 Rp 240,000.000
Jumlah Harga Bahan (B) Rp. 240,785.40
C PERALATAN
Sewa Welding set unit/hari 0.189 Rp 350,000 Rp. 66,104.50
Jumlah Harga Alat (C) Rp. 66,104.50
D Jumlah ( A + B + C ) Rp. 331,840.82
E Overhead & Profit 10% x D Rp. 33,184.08
F Harga Satuan Pekerjaan ( D + E ) Rp. 365,024.90
G Dibulatkan Rp. 365,024.00

Analisa : AHSP A.0.0.21


Item : Pekerjaan Screeding
Satuan : m2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.200 Rp 174,748 Rp 34,950
Tukang Batu OH 0.100 Rp 183,834 Rp 18,383
Kepala Tukang Batu OH 0.010 Rp 199,782 Rp 1,998
Mandor OH 0.010 Rp 211,379 Rp 2,114
Jumlah Tenaga Kerja (A) Rp. 57,444.61
B BAHAN
Semen zak 0.288 Rp 46,750 Rp 13,464.000
Pasir m3 0.039 Rp 221,286 Rp 8,630.143
Jumlah Harga Bahan (B) Rp. 22,094.14
C PERALATAN
Rp -
Jumlah Harga Alat (C) Rp -
D Jumlah ( A + B + C ) Rp. 79,538.75
E Overhead & Profit 10% x D Rp. 7,953.88
F Harga Satuan Pekerjaan ( D + E ) Rp. 87,492.63
G Dibulatkan Rp. 87,492.00

Analisa : AHSP A.0.0.21


Item : Pemasangan Saluran U-ditch
Satuan : m1

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.571 Rp 174,748 Rp 99,781
Mandor OH 0.286 Rp 211,379 Rp 60,454
Jumlah Tenaga Kerja (A) Rp. 160,235.50
B BAHAN
U-ditch unit 0.833 Rp 270,000 Rp 224,991.000
Rp -
Jumlah Harga Bahan (B) Rp. 224,991.00
C PERALATAN
Sewa Crane set 0.200 Rp 500,000 Rp. 100,000.00
Jumlah Harga Alat (C) Rp. 100,000.00
D Jumlah ( A + B + C ) Rp. 485,226.50
E Overhead & Profit 10% x D Rp. 48,522.65
F Harga Satuan Pekerjaan ( D + E ) Rp. 533,749.15
G Dibulatkan Rp. 533,749.00

Analisa : AHSP A.0.0.21


Item : Pemasangan Saluran tutup U-ditch
Satuan : m1

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.079 Rp 174,748 Rp 13,875
Mandor OH 0.020 Rp 211,379 Rp 4,185
Jumlah Tenaga Kerja (A) Rp. 18,060.30
B BAHAN
tutup U-ditch unit 0.833 Rp 130,000 Rp 108,290.000
Rp -
Jumlah Harga Bahan (B) Rp. 108,290.00
C PERALATAN
Rp -
Jumlah Harga Alat (C) Rp -
D Jumlah ( A + B + C ) Rp. 126,350.30
E Overhead & Profit 10% x D Rp. 12,635.03
F Harga Satuan Pekerjaan ( D + E ) Rp. 138,985.32
G Dibulatkan Rp. 138,985.00

Analisa : AHSP A.0.0.21


Item : Pemasangan paving block type convave
Satuan : m2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.083 Rp 174,748 Rp 14,504
Tukang Batu OH 0.043 Rp 183,834 Rp 7,905
Kepala Tukang Batu OH 0.004 Rp 199,782 Rp 859
Mandor OH 0.083 Rp 211,379 Rp 17,544
Jumlah Tenaga Kerja (A) Rp. 40,812.47
B BAHAN
Pasir m3 0.150 Rp 221,286 Rp 33,192.857
Conpave Verona m2 1.000 Rp 100,000 Rp 100,000.000
Jumlah Harga Bahan (B) Rp. 133,192.86
C PERALATAN
Rp -
Jumlah Harga Alat (C) Rp -
D Jumlah ( A + B + C ) Rp. 174,005.32
E Overhead & Profit 10% x D Rp. 17,400.53
F Harga Satuan Pekerjaan ( D + E ) Rp. 191,405.86
G Dibulatkan Rp. 191,405.00

Analisa : AHSP A.0.0.21


Item : Pemasangan ubin pengarah
Satuan : m2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.250 Rp 174,748 Rp 43,687
Tukang Batu OH 0.125 Rp 183,834 Rp 22,979
Kepala Tukang Batu OH 0.013 Rp 199,782 Rp 2,597
Mandor OH 0.013 Rp 211,379 Rp 2,748
Jumlah Tenaga Kerja (A) Rp. 72,011.34
B BAHAN
Pasir m3 0.045 Rp 221,286 Rp 9,957.857
Semen zak 1.000 Rp 69,999 Rp 69,998.750
Ubin pengarah Buah 11.110 Rp 25,000 Rp 277,750.000
Jumlah Harga Bahan (B) Rp. 357,706.61
C PERALATAN
Rp -
Jumlah Harga Alat (C) Rp -
D Jumlah ( A + B + C ) Rp. 429,717.95
E Overhead & Profit 10% x D Rp. 42,971.80
F Harga Satuan Pekerjaan ( D + E ) Rp. 472,689.75
G Dibulatkan Rp. 472,689.00

Analisa : AHSP A.0.0.21


Item : Pemasangan grasblock
Satuan : m2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.083 Rp 174,748 Rp 14,504
Tukang Batu OH 0.043 Rp 183,834 Rp 7,905
Kepala Tukang Batu OH 0.004 Rp 199,782 Rp 859
Mandor OH 0.083 Rp 211,379 Rp 17,544
Jumlah Tenaga Kerja (A) Rp. 40,812.47
B BAHAN
Pasir m3 0.150 Rp 221,286 Rp 33,192.857
GrassBlock Buah 1.000 Rp 16,000 Rp 16,000.000
Jumlah Harga Bahan (B) Rp. 49,192.86
C PERALATAN
Rp -
Jumlah Harga Alat (C) Rp -
D Jumlah ( A + B + C ) Rp. 90,005.32
E Overhead & Profit 10% x D Rp. 9,000.53
F Harga Satuan Pekerjaan ( D + E ) Rp. 99,005.86
G Dibulatkan Rp. 99,005.00

Analisa : AHSP A.0.0.21


Item : Pemasangan kusen aluminium
Satuan : m1

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja OH 0.043 Rp 174,748 Rp 7,514
Tukang Batu OH 0.043 Rp 183,834 Rp 7,905
Kepala Tukang Batu OH 0.004 Rp 199,782 Rp 859
Mandor OH 0.002 Rp 211,379 Rp 444
Jumlah Tenaga Kerja (A) Rp. 16,721.98
B BAHAN
Profil aluminium 4" m 1.100 Rp 64,000 Rp 70,400
Skrup Fisher Buah 2.000 Rp 360 Rp 719
Sealant tube 0.060 Rp 10,000 Rp 600
Jumlah Harga Bahan (B) Rp 71,719.000
C PERALATAN
Rp -
Jumlah Harga Alat (C) Rp -
D Jumlah ( A + B + C ) Rp. 88,440.98
E Overhead & Profit 10% x D Rp. 8,844.10
F Harga Satuan Pekerjaan ( D + E ) Rp. 97,285.08
G Dibulatkan Rp. 97,285.00

Analisa : AHSP A.0.0.21


Item : Pemasangan Pintu Kaca Rangka Aluminium
Satuan : m2

Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan
(Rp.) (Rp.)
A TENAGA
Pekerja OH 0.085 Rp 174,748 Rp 14,854
Tukang Batu OH 0.085 Rp 183,834 Rp 15,626
Kepala Tukang Batu OH 0.009 Rp 199,782 Rp 1,798
Mandor OH 0.005 Rp 211,379 Rp 1,057
Jumlah Tenaga Kerja (A) Rp. 33,334.40
B BAHAN
Profil aluminium 4" m 4.400 Rp 64,000 Rp 281,600
Profil Kaca m 4.500 Rp 66,667 Rp 300,000
Sealant tube 0.270 Rp 10,000 Rp 2,700
Jumlah Harga Bahan (B) Rp 584,300.000
C PERALATAN
Rp -
Jumlah Harga Alat (C) Rp -
D Jumlah ( A + B + C ) Rp. 617,634.40
E Overhead & Profit 10% x D Rp. 61,763.44
F Harga Satuan Pekerjaan ( D + E ) Rp. 679,397.84
G Dibulatkan Rp. 679,397.00
118800
BAHAN MATERIAL

NO JENIS BAHAN BANGUNAN SAT HARGA KETERANGAN

DOKUMENTASI
1 CD copy soft file foto image bh 2,200.00

2 Cetak foto lbr 1,500.00 http://tequillartcorporation.blogspot.co.id/p/daftar-harga-cetak-foto-digital-no.html

3 Album foto bh 50,000.00 https://www.lazada.co.id/beli-album-foto/

BATU PECAH
1 Sirtu, kerikil, koral m3 250,000.00 https://www.tokopedia.com/rcmsupplier/batu-sirtu-pasir-dll
2 Split 2/3 (m3 = 1350kg) m3 250,000.00 https://www.tokopedia.com/rcmsupplier/batu-split-cor-kerikil?extParam=whid%3D10552874
3 Tanah Merah/ Tanah Urug m3 - https://www.tokopedia.com/tpimandiri/tanah-merah-super-1-truck-7-8-kubik?src=topads
4 Batu kali belah m3 280,000.00 https://www.tokopedia.com/tjspasir/batu-belah-kualitas-terbaik?extParam=ivf%3Dfalse%26src%3Dsearch&refined=true
5 Batu Andesit Bakar 30x30 t=2 m2 169,000.00 https://www.tokopedia.com/gudangbatualam-1/batu-alam-andesit-bakar-30x30-2-cm?extParam=ivf%3Dfalse%26src%3Dsearch

JENIS PASIR DAN TANAH


1 Pasir pasang/tras m3 221,285.71 https://www.tokopedia.com/indopasirjaya/pasir-pasang-halus-7-kubik-free-ongkir-jkt-tng
2 Pasir beton (m3 = 1400kg) m3 285,000.00 https://www.tokopedia.com/supplierpasirbatu24jam/pasir-hitam-cor-cuci-extra-beton-grade-a-abu-cas-bangunan-jktbarat-selatn?extParam=ivf%3Dfalse%26src%3Dsearch
3 Pasir urug m3 300,000.00 https://www.tokopedia.com/gemilangpasir/pasir-urug-murni-bersih-muatan-6-5-kubik-free-ongkir-jakarta?src=topads
4 Abu batu m3 250,000.00 https://www.tokopedia.com/supplierpasirbatu24jam/pasir-abu-batu-tangerang?extParam=ivf%3Dfalse&src=topads
5 Material Urug Biasa / Puing m3 100,000.00 https://www.tokopedia.com/buangpuin/urugan-puing?extParam=ivf%3Dfalse&src=topads

PAS. BATA MERAH


1 Batu bata merah super bh 500.00 https://www.tokopedia.com/mossaa/bata-merah-press-jumbo?extParam=ivf%3Dfalse%26src%3Dsearch
2 Bata ringan Hebel 10x20x60 cm = 1Kubik 83 pcs / 10M2 m3 430,000.00 https://www.tokopedia.com/centraljpersada/bata-ringan-hebel-1-truk-10-cm-balaraja-ckande?extParam=whid%3D5138274
3 Bataco bekisting 40x19x9 cm bh 17,000.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 261
3 Rooster kecil 11,5x23,5 cm (30 bh per m2) bh 13,500.00 Jurnal edisi 38 tahun XXV 2019
4 Bata Berongga bh 2,400.00 https://www.tokopedia.com/rostermodern/bata-expose-bata-tanah-liat-bata-banting-batu-bata?extParam=ivf%3Dfalse&src=topads
Bata Ringan Hebel 7,5 cm bh 4,188.03 https://www.tokopedia.com/atsindo/bata-ringan-grade-standar-premium-quality-jabodebek?extParam=ivf%3Dfalse&src=topads

PORTLAND CEMENT
1 Semen Tiga Roda 50 kg kg 1,399.98 https://www.tokopedia.com/matrialberkah/semen-tiga-roda-40-kg?extParam=ivf%3Dfalse%26src%3Dsearch
2 Semen Padang 40 kg zak 46,750.00 https://www.tokopedia.com/harapanmitrakreasi/hmk-semen-padang-40-kg-200-zak-jabodetabek-dengan-bongkar?extParam=whid%3D13987560
3 Semen Counch kg 1,120.00 https://www.tokopedia.com/harapanmitrakreasi/hmk-semen-conch-40-kg-250-zak-jabodetabek?extParam=whid%3D13987560
4 Semen putih/warna pasang lantai/dinding kg 11,800.00 https://www.tokopedia.com/smarttools/am53-am-53-semen-nat-keramik-auker-nat-keramik-berbagai-warna-blue-aster?extParam=ivf%3Dfalse%26src%3Dsearch
5 Semen Grouting (25 kg) ex. Sikka grout kg 3,900.00 https://www.tokopedia.com/ja21/sika-grout-215-new-semen-grouting-25kg?extParam=ivf%3Dfalse%26src%3Dsearch
6 Semen MU-200 Acian beton 40 kg kg 3,200.00 https://www.tokopedia.com/cahayaabadijkt/semen-mortar-mu-200-mu200-semen-acian-dan-plester-40kg?extParam=ivf%3Dfalse%26src%3Dsearch
7 Semen MU-380 Perekat bata ringan 40 kg kg 2,462.50 https://www.tokopedia.com/cahayaabadijkt/etalase/semen-mu-mortar-utama-1
8 Semen DM-201 Plesteran 50 kg kg 990.00 https://www.tokopedia.com/duniamortar/dunia-mortar-semen-plaster-instant-dinding-plesteran-instan-plester-50
9 Semen DM-932 Perekat 40 kg kg 1,475.00 https://www.tokopedia.com/duniamortar/dunia-mortar-perekat-hebel-insbond-dm932-thinbed-lem-mu380-bata-ringan
10 Semen DM-208 Acian Bata Ringan kg 1,737.50 https://www.tokopedia.com/duniamortar/dunia-mortar-acian-instant-dm208-semen-bata-ringan-mortar-mu-instan

BAHAN KAYU
https://www.tokopedia.com/toko-terus-maju/kayu-balok-5x10-untuk-proyek-grade-bagus-harga-terbaik?
1 Balok Kayu m3 1,625,000.00
extParam=ivf%3Dfalse%26src%3Dsearch
2 Kayu perancah/kayu kelas III ( kaso 5/7) m3 1,500,000.00 https://www.tokopedia.com/suppliermaterial/kaso-5x7-lampung-free-ongkir?extParam=whid%3D12080270
3 Dolken dia. 8 cm panjang 4 m btg 45,000.00 https://www.tokopedia.com/toko-terus-maju/kayu-dolken-ukuran-8-10-untuk-proyek?extParam=ivf%3Dfalse%26src%3Dsearch
4 Kayu kamper samarinda, papan (oven) m3 13,450,000.00 https://www.tokopedia.com/tokocitrakayu/kayu-kamper-samarinda-oven-super-4x20x500-cm-tidak-diserut
5 Kayu kamper samarinda, balok (oven) m3 14,240,000.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 264
6 Kayu albasia m3 7,800,000.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 264
7 Bambu Ǿ 6-8/600 cm (bambu sedang) btg 33,000.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 264
8 Pintu kayu m2 700,000.00 https://www.tokopedia.com/udmandirijaya/pintu-kayu-meranti

BESI DAN KAWAT


1 Rata-rata U24 real @ 8,382/kg kg 8,382.00 https://www.tokopedia.com/intikaryabindo/besi-beton-10-mm-polos-sni-harga-pabrik
~ KS Cilegon SNI dia. 8 mm btg - Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 267
~ KS Cilegon SNI dia. 10 mm btg - Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 267
~ KS Cilegon SNI dia. 12 mm btg 109,000.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 267
~ KS Cilegon SNI dia, 13 mm btg - Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 267
~ KS Cilegon SNI dia. 16 mm btg - Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 267
2 Jaring kawat baja/wiremesh kg 9,710.00 Harga tertinggi dari ukuran M4 s/d M12 setelah dikonversi ke kg
~ M4 (2,1x5,4) m/lembar lbr 170,000.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 265
https://www.tokopedia.com/bajamart/besi-wiremesh-full-sni-m5-m6-m7-m8-m9-m10-4-7-mm?extParam=whid
~ M5 (2,1x5,4) m/lembar (full SNI sertifikat, uk 4,7) 19,55kg lbr 259,878.00
%3D6890857
~ M6 (2,1x5,4) m/lembar 34,76kg lbr 375,000.00 https://www.tokopedia.com/besibetonjakarta/wiremesh-m6-sni-full-sertifikat-0-2?extParam=whid%3D1870898
~ M7 (2,1x5,4) m/lembar lbr 476,500.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 265
~ M8 (2,1x5,4) m/lembar (full SNI sertifikat, uk 7,8-8, Toleransi 0,2) 61,79kg lbr 749,000.00 https://www.tokopedia.com/besibetonjakarta/wiremesh-m8-full-sni-2-1m-x-5-4m-sertifikat?extParam=whid
%3D1870898
~ M8 (2,1x5,4) m/lembar (SNI, uk 7.5-7.7, Toleransi 0,2) 57,24 KG lbr 690,000.00 https://www.tokopedia.com/besibetonjakarta/wiremesh-m8-full-sni-2-1m-x-5-4m?extParam=whid%3D1870898
~ M8 (2,1x5,4) m/lembar (SNI, uk 7.2, Toleransi 0,2) 50,07 lbr 598,000.00 https://www.tokopedia.com/besibetonjakarta/wiremesh-m8-0-8-2-1m-x-5-4m?extParam=whid%3D1870898
~ M8 (2,1x5,4) m/lembar (uk 6,7, Toleransi 0,2) lbr 517,000.00 https://www.tokopedia.com/besibetonjakarta/wiremesh-m8?extParam=whid%3D1870898

~ M9 (2,1x5,4) m/lembar lbr 750,000.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 265
~ M10 (2,1x5,4) m/lembar (full SNI sertifikat, uk 9,7) 90,84kg lbr 1,000,000.00 https://www.tokopedia.com/besibetonjakarta/wiremesh-m10-sni-full-2-1m-x-5-4m-sertifikat?extParam=whid
%3D1870898
~ M12 (2,1x5,4) m/lembar lbr 1,183,000.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 265
3 Kawat pengikat/kawat beton kg 17,500.00 https://www.tokopedia.com/sasteel/kawat-bendrat-kawat-beton-kawat-ikat-packing-20-kg
4 Kawat las kg 50,000.00 https://shopee.co.id/KAWAT-LAS-STAINLESS-NSN-308-NIKKO-STEEL-i.212421562.9608952609
5 Besi plat strip rata-rata kg 23,200.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 266
6 Besi hollow rata-rata 40 mm x 40 mm x 0,3 x 6000 mm m1 4,500.00 https://www.tokopedia.com/andalprima/holo-plafon-2x4-dan-4x4-holo-gypsum-hollow-0-30mm-4x4?extParam=whid%3D7704
Besi hollow Galvanis 40 mm x 40 mm x1mm btg 119,000.00 https://www.tokopedia.com/andalprima/hollow-galvanis-40-x-40-hollow-galvanish-40-x-40-tebal-1-0mm?extParam=whid%3D7704
7 Besi hollow rata-rata 20 mm x 40 mm x 1,4 x 6000 mm m1 7,125.00 https://www.tokopedia.com/imsweet/hollow-hollo-galvalum-2x4-0-4-sni?extParam=ivf%3Dfalse%26src%3Dsearch

8 Besi stainless steel SS 304 dia. 2,5'' tb. 1,2 mm / btg 6 m btg 624,000.00 http://duniabahanbangunanbandung.blogspot.co.id/p/harga-besi-pipa-stainless-steel.html

9 Besi stainless steel SS 304 dia. 2'' tb. 1,2 mm btg 498,000.00 http://duniabahanbangunanbandung.blogspot.co.id/p/harga-besi-pipa-stainless-steel.html

10 Besi stainless steel SS 304 dia. 1,5'' tb. 1,2 mm btg - konversi
11 Besi stainless steel SS 201 dia. 2'' tb. 1 mm m1 47,500.00 https://www.tokopedia.com/bestcorner/pipa-2-x-1mtr-bulat-stainless-steel
11 Plat stainless steel SS 304 tb. 1,2 mm m2 - konversi
12 Besi hollow zinc 25 mm x 45 mm x 0,3 mm, panjang/btg 4 m m1 11,916.67 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 269
13 Besi hollow zinc 20 mm x 40 mm x 0,3 mm, panjang/btg 4 m m1 10,214.29 Konversi
14 Besi hollow zinc 40 mm x 40 mm x 0,3 mm, panjang/btg 4 m m1 13,619.05 Konversi
15 Besi hollow 75 mm x 75 mm x 1.8 mm, panjang/btg 6m m1 71,383.33 https://hargabangunan.id/besi-hollow/
16 Besi hollow 75 mm x 75 mm x 1.8 mm, panjang/btg 6m/25.43Kg kg 16,842.31 https://www.smsperkasa.com/
17 Harga rata-rata Profil kg 26,900.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 266
18 Besi Pipa Hitam 2" t=1,7 mm (P 6m/btg) kg 16,940.70 https://www.smsperkasa.com/produk/pipa-welded
Besi Pipa Hitam 1,5" t=1,4 mm (P 6m/btg) kg 18,006.61 https://www.smsperkasa.com/produk/pipa-welded
19 Pipa Galvanis 2" t=2 mm (P 6m/btg) btg 357,000.00 https://www.tokopedia.com/andalprima/pipa-galvanis-pipa-galvanish-2-inch-2-inch-tebal-2-0mm?extParam=whid%3D7704
20 Bondek 0,75mm L: 1000mm m2 150,000.00 http://www.agenbajaringan.com/bondek-floordeck.php
21 Baja WF Custom sesuai ukuran kg 16,950.00 https://www.tokopedia.com/sjdm1909/besi-wf-iwf-350-x-12-m-lautan-steel?extParam=ivf%3Dfalse%26src%3Dsearch
Plat Besi tebal 22mm uk. 1,2 x 2,4 m kg 8,612,000.00 https://www.tokopedia.com/rianbaja/besi-plat-ss400-a36-22-mm-4-x-8-feet?ref=wishlist
0.06
459.36
18,747.82
20 Plat Besi tebal 12mm uk. 0,4 x 0,4 m kg 4,693,000.00 https://www.tokopedia.com/andalprima/plat-hitam-12mm-1-20-x-2-40-meter-plat-eser-besi
0.0346
250.56
18,730.04
Plat besi Tebal 0,5mm bh 343,000.00 https://www.smsperkasa.com/
Plat Besi tebal 1,5mm uk. 1,2 x 2,4 m (/lembar 35kg = 604000) kg 17,257.14 https://www.tokopedia.com/andalprima/plat-hitam-1-20-x-2-40-meter-plat-eser-tebal-1-5mm?extParam=whid%3D7704
Plat besi Tebal 0,5mm harga per 100cm2 cm2 10,000.00 https://www.tokopedia.com/findustri/plat-besi-5mm-steel-plate-harga-per-1-cm2?extParam=whid%3D8455447
21 Besi UNP 100 x 50 x 6mm kg 14,012.46 https://www.tokopedia.com/anugerah-besi/besi-unp-kanal-u-100-x-50-tebal-5mm-x-6m?ref=wishlist
22 CNP 125 x 50 x 20 x 3,2mm kg 20,181.82 https://www.tokopedia.com/andalprima/cnp-besi-125-x-50-x-3-2mm-kanal-c-kaki-tinggi?ref=wishlist
CNP 150 x 50 x 20 x 2,3mm kg 22,407.41 https://www.tokopedia.com/andalprima/cnp-besi-150-x-50-x-2-3mm-kanal-c-kaki-tinggi
22 Besi Siku 60x60x 6mm kg 12,453.87 https://www.tokopedia.com/sintera202/besi-siku-60-x-6-sni-6cm-x-6-mm-siku-6?extParam=whid%3D8149364
23 Besi Siku 70x70x7mm kg 10,496.61 https://www.tokopedia.com/sintera202/besi-siku-70-x-7-sni-7cm-x-7-mm-siku-7?ref=wishlist
24 Besi Siku 80x80x 8mm kg 13,008.97 https://www.tokopedia.com/idpsteel/besi-siku-80-x-80-x-8-mm-6-m-80x80x6mm?ref=wishlist

Harga Material Page 112


NO JENIS BAHAN BANGUNAN SAT HARGA KETERANGAN

Besi Siku 40x40x4mm kg 8,689.66 https://www.tokopedia.com/sintera202/besi-siku-40-x-4-sni-4-cm-x-4-mm-siku-4?extParam=whid%3D8149364


Pipa Besi Dia 2" T4mm kg 75,000.00 https://www.tokopedia.com/andalprima/siku-besi-40-x-40-grade-a-38-x-38-x-tbl-3-5mm?extParam=whid%3D7704
Baja Ringan C75 btg 96,500.00

BAHAN ATAP
1 Seng plat BJLS 0,4 mm 1,2x2,4 m lbr 300,300.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 270
2 Seng gelombang bjls 0,20 mm, 80x180 cm lbr 53,500.00 https://www.tokopedia.com/tokobajaperkasa/seng-gelombang?extParam=ivf%3Dfalse%26src%3Dsearch
3 Seng plat bjls 0,40 mm, 1,20x2,40 cm lbr 300,300.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 270
4 Aluminium Composite Panel (ACP) tebal 4 mm ALCOPAN m2 200,000.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 270
5 Pasangan rangka atap baja ringan m2 289,000.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 274
6 Atap Spandek 600 mm tb 0,3 mm m2 49,000.00 https://www.tokopedia.com/vvjayaaaaa/atap-spandex-zincalume-0-35-real-0-30-6-meter?extParam=ivf%3Dfalse&src=topads
7 Nok/ alumunium m1 89,000.00 https://www.tokopedia.com/kaisarsteel/talang-juray-nok-atap-spandek-zincalume?whid=0
8 Sekrup/paku bh 1,200.00 onduline
9 GRC Lisplank Flat tebal 15 mm lebar 30 cm m1 75,000.00
10 Atap Bitumen Shingle (sirap) m2 19,285.71 https://www.tokopedia.com/gentengbitumen/genteng-bitumen-maxxi-roof-3-tab-shingles?extParam=ivf
%3Dfalse%26src%3Dsearch
https://www.tokopedia.com/atapzinctruss/atap-zincalume-spandek-pasir-0-40-mm-atap-metal-per-meter-1-m?
11 Atap Metal Berpasir uk. 77 x 80 cm lbr 87,000.00
ref=wishlist
12 Nok Metal Berpasir lbr 119,500.00 https://www.tokopedia.com/azi-roof/nok-spandek-pasir-3m-merah?ref=wishlist

PAKU DAN IJUK


1 Paku 7 cm (paku usuk kayu) kg 13,560.00 https://www.tokopedia.com/tokobajaperkasa/paku-seri-kayu-paku-kayu-distributor-paku-kayu-pabrik-paku-kayu
2 Paku gypsum kg 42,500.00 https://www.tokopedia.com/worldstar/skrup-gypsum-6-x-2-camel-sekrup-gypsum-5cm-drywall-screw-6-x-
2inch?extParam=ivf%3Dfalse%26src%3Dsearch
https://www.tokopedia.com/gosariutama/sekrup-roofing-kuning-baut-baja-ringan-bdm-12x50-5cm?
3 Paku sekrup bh 360.00
extParam=ivf%3Dfalse&src=topads
4 Ramset/Dynabolt bh 15,000.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 277
https://www.tokopedia.com/infinitywars/paku-payung-7-cm-paku-seng-asbes-ulir-curah-3-inch-per-kg?
5 Scrup gypsum kg 28,000.00
extParam=ivf%3Dfalse%26src%3Dsearch
6 Mur baut baja M16 7,100.00 bh https://www.tokopedia.com/bautgrosir/baut-mur-baja-m16-x-50-baut-baja-hitam-grade-8-8-high-tensile-bolt-
htb-half-drat
7 Mur baut baja M14 4,000.00 bh https://www.tokopedia.com/bautgrosir/baut-mur-baja-8-8-m14-x-30-full-drat-baut-kunci-22-baut-hitam-14x30-ft
8 Mur baut baja M12 3,850.00 bh https://www.tokopedia.com/bautgrosir/baut-mur-baja-8-8-m12-x-40-kunci-19-baut-hitam-high-tensile-bolt-8-8
Angkur L M16 40 bh 21,800.00 https://www.tokopedia.com/jayakencanafasteners/anchor-bolt-l-angkur-l-5-8-m16-x-400-mm-st37-st41-s45c-st37-behel?extParam=ivf%3Dfalse%26src%3Dsearch

BAHAN PENUTUP LANTAI


https://www.tokopedia.com/houseofroman/roman-keramik-venere-dust-20x20-g220501-roman-house-of-
1 Keramik Roman 20x20 cm polished m2 95,000.00
roman?extParam=ivf%3Dfalse%26src%3Dsearch
2 Keramik Lantai Roman 30x30 cm unpolished m2 103,600.00 https://www.tokopedia.com/mjayakeramik/keramik-lantai-roman-dbatur-series-30x30-kw-1-g330510-perla
https://www.tokopedia.com/mjayakeramik/keramik-roman-dmarbella-w63334r-bruno-w63833r-winter-30x60-
3 Keramik Dinding Roman 30x60 cm polished m2 28,940.00
cm-kw1-w63833r-winter
https://www.tokopedia.com/imbangunann/keramik-dinding-mulia-10-x-20-subway-bevel-white-gloss-kw-1?
4 Keramik Dinding Mulia 10x20 m2 73,500.00
extParam=ivf%3Dfalse%26src%3Dsearch
https://www.tokopedia.com/mjayakeramik/keramik-lantai-roman-dmiami-series-40x40-cm-kw1-g447516-
5 Keramik Lantai Roman 40x40 cm polished m2 103,300.00
bone?extParam=whid%3D52607
https://www.tokopedia.com/mjayakeramik/roman-granit-dpozlana-light-gt602517r-dark-gt602518r-60x60-kw-
6 Keramik Lantai Roman 60x60 cm polished m2 52,000.00
1-gt602517r-ligh
7 HT Granito 60x60, polished dus 268,000.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 280
8 HT Granito 40x40, polished m2 375,000.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 280
9 HT Granito 40x40, unpolished m2 271,000.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 280
https://www.tokopedia.com/milantiles/habitat-cementi-d-gris-60x60-keramik-lantai-bebatuan-matt?
10 HT Indogress grey60x60 cm dus 150,000.00
extParam=ivf%3Dfalse%26src%3Dsearch
11 Plint HT 10x60 Potongan dari HT 60x60 cm bh 17,500.00 https://www.tokopedia.com/mitragranite/list-plint-granit-10x60-avalon-ivory-valentino-gress-kw1?
extParam=ivf%3Dfalse%26src%3Dsearch
12 Plint PVC btg 197,400.00 https://www.tokopedia.com/homeklikolshop/list-plank-10-cm-plint-pvc-skirting-list-lantai-kayu-lantai-viny-2-
4m-607?extParam=ivf%3Dfalse&src=topads
13 Lem pvc bh 85,000.00 https://www.tokopedia.com/kangbangdb/sikaflex-auto-black-sausage-sealent-lem-khusus-plint-plank-pvc-kuat-
white
14 Step nossing HT 10 x 60 cm bergaris timbul bh - https://www.tokopedia.com/granitmurah/list-granit-stepnose-10x60-rustic?extParam=ivf%3Dfalse%26src%3Dsearch
15 Plint Keramik 10x30 Potongan dari Keramik 30x30 cm bh 964.67 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 280
16 Batu candi hitam m2 115,000.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 280
17 Keramik Mulia 30x30 doos 56,000.00 https://www.tokopedia.com/mjayakeramik/keramik-lantai-mulia-signature-balcon-natura-30x30-kw1?extParam=ivf%3Dfalse%26src%3Dsearch
18 Keramik Mulia 40x40 doos 65,000.00

BAHAN LOTENG/PLAFOND
1 Tripleks tebal 9 mm lbr 76,500.00 https://www.tokopedia.com/tokobajaperkasa/triplek-9-mm-cor-meranti-mc-plywood?extParam=whid%3D2858270
2 Triplek tebal 8 mm lbr 100,000.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 281
https://www.tokopedia.com/bemorabangunan/triplek-cor-4-mm-alba-uk-122-x-244-harga-grosir-free-ongkir?
3 Triplek tebal 4 mm lbr 50,500.00
extParam=ivf%3Dfalse%26src%3Dsearch
https://www.tokopedia.com/pabrisafetyshoes/triplek-12-mm-triplek-meranti-plywood-triplek-mc-triplek-uty?
4 Triplek tebal 12 mm lbr 124,000.00
extParam=ivf%3Dfalse&src=topads
4 Plywood untuk pintu tebal 4 mm lbr 166,000.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 282
https://www.tokopedia.com/atap-kita/gypsum-e-board-9mm-gipsum-eboard-papan-eboard-elephant?
5 Gypsum Board 120 x 240 cm, t = 9 mm lbr 46,000.00
extParam=whid%3D11428757

6 Gypsum 120 x 240 cm, t = 12 mm ex DN lbr 148,320.00


http://www.liman.co.id/product-103-daftar-harga-rangka-partisi-metal-stud-track-.html
7 Gypsum wet area (water resistant) lbr 126,240.00 http://www.liman.co.id/product-94-daftar-harga-papan-gipsum-.html
uk. 120 x 240 cm, t = 9 mm ex DN
8 Gypsum tape roll 12,900.00 https://www.tokopedia.com/juraganperkakas/blitz-lakban-gypsum-5-cm-40-meter-lem-kasa-fiberglass-tape-perekat?extParam=ivf%3Dfalse%26src%3Dsearch
9 Papan Akustik uk. 60x60 tbl. 9 mm lbr 17,000.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 282
10 Papan Akustik uk. 60x120 tbl. 9 mm lbr 30,000.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 282
11 Profil aluminium "T" btg 1,000.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 282

12 Shadow line tebal 3 mm, panjang 3 m btg 16,200.00


https://www.tokopedia.com/jayagalvalum/tali-air-gypsum-shadowline-shadow-line-gypsum
13 GRC board uk. 2,4 m x 1,2 m, tbl = 4 mm lbr 46,100.00 https://www.tokopedia.com/tokobajaperkasa/grc-board-semen-board-a-plus-4-mm?extParam=ivf%3Dfalse%26s
GRC board uk. 2,4 m x 1,2 m, tbl = 9 mm lbr 147,000.00 https://www.tokopedia.com/tokobajaperkasa/papan-silika-board-grc-aplus-9-mm-merk-aplus?extParam=ivf%3Dfalse%26src%3Dsearch

14 Metal stud uk. 34x76 mm tbl. 0,40 mm btg 57,720.00


http://www.liman.co.id/product-103-daftar-harga-rangka-partisi-metal-stud-track-.html

15 U runner uk. 25x76 mm tbl. 0,35 mm btg 52,080.00


http://www.liman.co.id/product-103-daftar-harga-rangka-partisi-metal-stud-track-.html

16 List profil gypsum lebar 10 cm m1 6,500.00 https://www.tokopedia.com/alfianinterior/list-profil-gypsum-motif-piano-polos-lebar-10cm?extParam=ivf%3Dfalse

17 List profil gypsum lebar 5 cm m1 10,000.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 282

18 List kayu kamper samarinda 1/15 cm m1 40,500.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 282
19 Rockwoll t=5 cm density 40 kg/m3 m2 43,000.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 282
20 Plafond PVC SUNDA PLAFOND lbr 66,330.00 https://www.tokopedia.com/juraganplafonpvc/shunda-plafon-pvc-serat-kayu-merah?extParam=ivf%3Dfalse&src=topads
Plafond PVC SUNDA PLAFOND Lebar 20cm, Tebal 8mm lbr 28,500.00 https://www.tokopedia.com/bbi/shunda-plafon-pl-08-005-1
Lisplank Motif betawi T=20cm, P=1,2m m 116,666.67 https://www.tokopedia.com/gentengrumah99/lisplang-betawi-20-cm

BAHAN PLAT ALUMINIUM


1 Aluminium kusen 4" CA, Alexindo m1 64,000.00 https://www.tokopedia.com/arlindostore/alexindo-shop-front-kaca-mati-m-warna-coklat-4-x-1mm-x-6m-
arlindo
2 Frame pintu 3" alumunium CA, Alexindo m1 130,900.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 276
3 Frame jendela 2" aluminium CA, Alexindo m1 125,800.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 276
Frame pintu Kaca m1 66,666.67 https://www.tokopedia.com/sinarrezeki8/frame-aluminium-hitam-kaca-lemari-kitchen-profil-lis-bingkai-fa-21-
128?extParam=ivf%3Dfalse%26src%3Dsearch
4 Alumunium Composite Panel Seven t=4 mm (1220x2440 mm) lbr 755,000.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 276
5 Jalusi Alluminium m1 42,650.00 https://www.tokopedia.com/ascoaluminium/aumunium-jalusi-10cm-profile-1331-ca

BAHAN KACA
1 Kaca polos tebal 8 mm m2 233,300.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 276
2 Kaca tempered tebal 8 mm m2 455,000.00 https://bildeco.com/blog/harga-bahan-bangunan-kaca/
3 Kaca tempered tebal 12 mm m2 755,000.00 https://bildeco.com/blog/harga-bahan-bangunan-kaca/
2 Kaca laminated polos 8 mm (4+0,38+4) m2 426,017.50 materialharga.com
3 Kaca polos tebal 3 mm m2 131,000.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 276
4 Kaca polos tebal 5 mm m2 114,000.00 https://www.tokopedia.com/dutakaca/kaca-clear-polos-5mm-asahimas?extParam=ivf%3Dfalse%26src
%3Dsearch
Kaca polos tebal 8 mm m2 200,000.00 https://www.tokopedia.com/dutakaca/kaca-clear-polos-8mm-asahimas?extParam=whid%3D4261086
5 Kaca tempered 10 mm m2 670,000.00
6 Kaca tempered 12 mm m2 843,000.00
7 Sealant/per tube bh/tube 10,000.00 https://www.tokopedia.com/anekabangunanjaya/lem-kaca-lem-silicon-sealant-tube-lem-aquarium-besar-85gram?extParam=ivf%3Dfalse%26src%3Dsearch
8 Sealant/per m1 kg 56,250.00 https://www.tokopedia.com/anekabangunanjaya/lem-kaca-lem-silicon-sealant-tube-lem-aquarium-besar-85gram?extParam=ivf%3Dfalse%26src%3Dsearch

https://www.alibaba.com/product-detail/6mm-back-painted-toughened-glass-for_1599292260.html?spm=
9 Kaca backpanted tb. 8 mm m2 364,000.00
a2700.7724838.2017115.10.63465754r7Iurz&s=p

9 Kaca cermin bevel asahi m2 266,000.00 https://www.tokopedia.com/gurai/kaca-cermin-kamar-mandi-besar-asahi-5ml-ukuran-50x70-bevel-persegi?extParam=ivf%3Dfalse%26src%3Dsearch

10 Sticker sandblast m2 85,000.00 http://www.kacafilmsandblast.com/?page=kategori&idkat=6439&kat=Kaca+Film+Sandblast

10 Lis Karet Jendela m1 7,000.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 276

Harga Material Page 113


NO JENIS BAHAN BANGUNAN SAT HARGA KETERANGAN

BAHAN PENGGANTUNG DAN KUNCI


1 Door closer dekson 40 kg set 295,000.00 Provinsi DKI Jakarta Hal. 348
2 Handle pintu stainless steel, HRE Griff psg 175,000.00 https://www.tokopedia.com/rajakuncisaniter/handle-pintu-roses-dekson-lhtr-0003-sss-handle-pintu-gagang-
pintu?extParam=ivf%3Dfalse%26src%3Dsearch
3 Kunci pitu swing (lockcase + cylinder) 70 mm Normal Nickel set 304,500.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 297
https://www.tokopedia.com/sentrakaca/kunci-pintu-aluminium-dekkson-set-lockset-dekkson-kc-8123?
4 Kunci tanam pintu standar set 88,950.00
extParam=ivf%3Dfalse&src=topads
5 Floor hinges BTS 84/EN3/PSS, Dorma bh 1,875,000.00
6 Bottom pivot patch PT 10/PSS, Dorma bh 1,058,750.00
7 Top pivot patch PT 20/PSS, Dorma bh 1,058,750.00
8 Top pin PT 24-Silver, Dorma bh 458,750.00
9 Patch lock US 10/PSS, Dorma bh 1,755,000.00
https://www.tokopedia.com/gudang-gemilang/kunci-gagang-jendela-casement-handle-dekkson-ch-425-
10 Rumbuncis, Griff (handle Casmen) bh 11,500.00
rambuncis-silver-kanan?extParam=ivf%3Dfalse&src=topads
11 Friction stay 8", Griff psg 129,600.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 297
12 Flush Bolt type 1613.12 SS psg 161,000.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 297
13 Engsel pintu 4" x 3"x 2 mm, Wall Bearing SS psg 42,700.00 https://www.tokopedia.com/sentrakaca/engsel-pintu-aluminium-dekkson-4-es-al-2005-4x3-5x3mm-original-
hitam
14 Pull Handle SS H.30.30 L1200 mm psg 1,126,700.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 297
15 Pull Handle SS Bulat C.300.D.32 psg 527,100.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 297
16 Grendel Dekson (Kunci Slot) set 45,000.00 https://www.tokopedia.com/goldenkeymk/door-bolt-dekson-grendel-slot-kunci-pintu-db-d002-3-inch-sss?extParam=ivf%3Dfalse%26src%3Dsearch
17 engsel casmen dekson set 152,500.00 https://www.tokopedia.com/ellpro/engsel-casment-dekkson-stainless-steel-sus-304-ukuran-16-inchi-40cm?extParam=ivf%3Dfalse&src=topads
18 Engsel Pintu Biasa decson 5" psg 63,000.00 https://www.tokopedia.com/sentrakaca/engsel-kupu-kupu-dekkson-5-4-3-inch-iron-hinge-5-inch
19 Engsel Pintu Biasa decson 3" psg 35,000.00 https://www.tokopedia.com/sentrakaca/engsel-kupu-kupu-dekkson-5-4-3-inch-iron-hinge-3-inch

CAT DAN BAHAN FINISHING


1 Cat dinding dasar Exterior Catylac 20 kg Kg 30,947.05 https://www.tokopedia.com/sa888/cat-dasar-catylac-wall-sealer-21-kg-untuk-eksterior-exterior-pail-1-peil-21-kg
https://www.tokopedia.com/sa888/dulux-catylac-exterior-25-kg-putih-888-warna-cat-khusus-exterior-warna?
2 Cat Dinding exterior Catylac kg 37,995.52
extParam=ivf%3Dfalse&src=topads
https://www.tokopedia.com/utamaindah1/cat-dasar-primer-untuk-tembok-jotaplast-jotun-warna-putih-25-kg?
3 Cat dinding dasar Jotun 20 kg kg 18,124.00
extParam=ivf%3Dfalse%26src%3Dsearch
4 Cat dinding interior dulux catylac galon 699,888.00 https://www.tokopedia.com/utamaindah1/cat-tembok-interior-jotun-jotaplast-easy-majestic-sage-green-6013-
majestictbmatt-840d
https://www.tokopedia.com/jotun-bekasi/cat-jotun-jotashield-af-20l-wilthshirecream?extParam=ivf
5 Cat dinding exterior Jotun (jotashields) 20 kg klg 79,400.00
%3Dfalse&src=topads
6 Cat Dinding putih Q-luc Galon 253,000.00 https://www.tokopedia.com/arta-bangunan/cat-tembok-qluc-putih-25-kg?extParam=ivf%3Dfalse%26src%3Dsear
https://www.tokopedia.com/maggiohomecentre/cat-lapangan-tennokote-cat-garis-lapangan-tnk-1000wa-5kg-
7 Cat dinding exterior TENOKOTE KG 45,000.00
propan-reguler?extParam=ivf%3Dfalse%26src%3Dsearch&refined=true
https://www.tokopedia.com/cahayabangunan/amplas-ampelas-kertas-air-lembaran-kasar-halus-besi-kayu-
8 Amplas standar lbr 6,000.00
motor-toho?extParam=ivf%3Dfalse%26src%3Dsearch&refined=true
https://www.tokopedia.com/smarttools/kuas-roll-ace-9-budget-besar-refill-bulu-roll-ace?extParam=ivf%3Dfalse
9 Kuas rol besar bh 30,000.00
%26src%3Dsearch
https://www.tokopedia.com/smarttools/sika-top-sikatop-seal-107-set-a-b-waterproofing?extParam=ivf%3Dfalse
10 Sika Top Seal A+B, 25 kg zak 314,900.00
%26src%3Dsearch
https://www.tokopedia.com/exitointeres/loodmenie-meni-menie-kayu-cap-kampak-kapak-cat-kayu-orange-1-
11 Meni kayu kg 28,000.00
kg?extParam=ivf%3Dfalse%26src%3Dsearch
https://www.tokopedia.com/smj-bintaro/cat-minyak-menie-kansai-ftalit-primer-cat-dasar-zinc-chromate-1-kg-
12 Cat primer kayu kg 45,500.00
red-oxide-008?extParam=ivf%3Dfalse%26src%3Dsearch
13 Dempul duco (propan), 1,25 kg klg 55,000.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 302
14 Cat besi avian kg 68,000.00 https://www.tokopedia.com/cahayabarugroup/cat-avian-high-gloss-enamel-untuk-kayu-dan-besi-1-kg?
extParam=ivf%3Dfalse%26src%3Dsearch
15 Lem putih fox kg 40,000.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 302
16 Lem Kuning FOX 1 kg kg 40,000.00 http://dataharga.blogspot.co.id/
17 Lem fox kuning 2,5 kg kg 51,200.00 https://www.tokopedia.com/tkcahayabaru/lem-kuning-fox-168-2-5kg-galon-kirim-gojek-grab?whid=0
18 HPL Taco motif serat kayu tipe J/FC (uk. 122 cm x 244 cm) lbr 165,000.00
20 Solid surface tb. 8 mm m2 1,556,400.00
21 Wallpaper goodrich motif/warna uk. 0,5 m m2 45,000.00 Jurnal edisi 38
22 Woodfiller kg 65,000.00 https://www.builder.id/harga-cat-impra-2020/
23 Woodstain ltr 70,000.00 https://www.builder.id/harga-cat-impra-2020/
24 Sending sealer ltr 65,000.00 https://www.builder.id/harga-cat-impra-2020/
25 Melamic top coat ltr 45,000.00 https://www.rumahmaterial.com/2017/05/analisa-harga-satuan-finishing-melamik-kusen-pintu-kayu.html
26 Soda api kg 25,000.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 302
27 Cumoir Waterproofing Coating kg 78,100.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 302
28 Residu / Minyak Bekesting ltr 21,250.00 https://www.tokopedia.com/kudamas8/estoform-ob-20-ltr-pail-minyak-bekisting-minyak-bekesting-murah?extParam=ivf%3Dfalse
29 Solar Industri ltr 13,400.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 302
30 Minyak pelumas ltr 47,750.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 302
31 Politur kayu Propan ltr 72,000.00 https://www.tokopedia.com/cahayaajaya/cat-politur-pelapis-kayu-ultran-p-05-propan-ready-semua-warna-sollar-yellow?extParam=ivf%3Dfalse&src=topads
32 Plamur kayu kg 37,500.00 https://www.tokopedia.com/tokobesivip/dempul-plamur-kayu-cap-kucing?extParam=ivf%3Dfalse&src=topads
33 Cat Minyak (Kayu) Ftalit kg 72,000.00 https://www.tokopedia.com/wandapaints/cat-ftalit-1-kg-cat-minyak-untuk-kayu-besi-ready-semua-warna?extParam=ivf%3Dfalse%26src%3Dsearch
34 Cat dasar Minyak (zincromate) / anti karat kg 45,500.00 https://www.tokopedia.com/smjdutamas/cat-dasar-anti-karat-meni-besi-kansai-red-oxide-008-1kg?ref=wishlist
35 Plamir dinding Dulux Catylac kg 14,175.00 https://www.tokopedia.com/wawawabekasi/plamir-dulux-catylac-20-kg?extParam=ivf%3Dfalse&src=topads
36 Plamir dinding Aries 25KG galon 270,000.00 https://www.tokopedia.com/tbsinarrejeki44/pail-25-kg-plamir-plamur-tembok-aries-gold-wall-putty-filler?extParam=ivf%3Dfalse%26src%3Dsearch&refined=true
37 Cat penutup mural momilex kg 132,000.00 https://www.tokopedia.com/smjdutamas/cat-tembok-mural-interior-mowilex-warna-cyanine-blue-bm-1002-1l?extParam=ivf%3Dfalse%26src%3Dsearch
38 Thiner ltr 15,500.00 https://www.tokopedia.com/sintesa10/thiner-hg-sr-isi-20-liter?extParam=ivf%3Dfalse&src=topads
39 Kuas 4" bh 5,300.00 https://www.tokopedia.com/l10sanitary31/kuas-cat-tembok-gagang-kayu-633-4-inch-koas-cat-murah-4-inch?extParam=ivf%3Dfalse%26src%3Dsearch
40 Kape Plastik bh 5,000.00

SANITARY
https://www.tokopedia.com/lmjtoto/kloset-duduk-dengan-eco-washer-toto-cw705enj-tv150nsv5j-tcw07sv2?
1 Closet Duduk, TOTO type CW 705 ENJ bh 5,474,000.00
extParam=ivf%3Dfalse%26src%3Dsearch
https://www.tokopedia.com/300486/closet-toto-ce9-tv150nwv12j?extParam=ivf%3Dfalse%26src
2 Closed Jongkok Flush, TOTO CE9 - TV150NSJ bh 3,130,000.00
%3Dsearch&refined=true
https://www.tokopedia.com/globalbangun/kloset-duduk-putih-toto-cw633j-monoblok-toto-kloset-duduk?
Closet Duduk, TOTO type CW633J bh 1,375,000.00
extParam=ivf%3Dfalse&src=topads
https://www.tokopedia.com/atrumahku/kloset-jongkok-toto-ce7?extParam=ivf%3Dfalse%26src
3 Closed Jongkok Flush, TOTO CE7 bh 275,000.00
%3Dsearch&refined=true
https://www.tokopedia.com/atrumahku/paket-complete-wastafel-toto-l529v1?extParam=ivf%3Dfalse%26src
4 Wastafel, TOTO type L529V1 bh 1,392,000.00
%3Dsearch
https://www.tokopedia.com/atrumahku/paket-complete-wastafel-toto-l529v1?extParam=ivf%3Dfalse%26src
4 Wastafel, TOTO type LW241CJ+LW239FJ bh 1,700,000.00
%3Dsearch
5 Urinoir, TOTO (U57M) bh 950,000.00 https://www.tokopedia.com/300486/urinal-toto-u57m-complete-dutytipea?extParam=ivf%3Dfalse&src=topads
https://www.tokopedia.com/diyahmart08/toto-tx403sb-jet-shower-kloset-dengan-stop-kran-toto-tx403sb?
6 Jet washer, TOTO TX403SB bh 375,000.00
extParam=ivf%3Dfalse%26src%3Dsearch
https://www.tokopedia.com/berkatsanitary/floor-drain-toto-baru-murah-tx1bn?extParam=ivf
7 Floor drain TX1BN bh 375,000.00
%3Dfalse&src=topads
https://www.tokopedia.com/atrumahku/kran-tembok-toto-t23b13v7nb?extParam=ivf%3Dfalse%26src
8 Kran dinding, TOTO (T23B13V7NB) bh 241,800.00
%3Dsearch&refined=true
https://www.tokopedia.com/saranajayautama/kitchen-sink-6045-paket-komplit?extParam=ivf%3Dfalse%26src
9 Kitchen sink, TOTO Standart bh 750,000.00
%3Dsearch
10 Kran Kitchen, TOTO (TX 603KM) bh 650,000.00 https://www.tokopedia.com/primapanel/kran-dapur-toto-tx603km?extParam=ivf%3Dfalse&src=topads
11 Hand rail TX3A1 520,000.00 https://www.tokopedia.com/atrumahku/toto-tx3a1-grab-bar?extParam=ivf%3Dfalse%26src%3Dsearch
12 Closet Duduk, TOTO type CW 420J bh 2,295,000.00 https://www.tokopedia.com/depopinangsia/kloset-toilet-toto-cw420j-with-eco-washer-1?extParam=ivf%3Dfalse%26src%3Dsearch
13 Royal sink SB42K bh 540,000.00 https://www.tokopedia.com/juragansanitary/paket-sb42k-sink-royal-kran-fleksible-meja-fiorentino?extParam=ivf%3Dfalse%26src%3Dsearch
14 Royal sink SB62K bh 610,000.00 https://www.tokopedia.com/lucyandri/sink-bak-cuci-piring-portable-royal-sb-62-k-sb62k-stainless-steel?extParam=whid%3D1317544
15 Kran Angsa bh 47,000.00 https://www.tokopedia.com/tbmajukreasi/termurah-kran-angsa-fleksibel-cuci-piring-keran-sink-stainless-stanlis-engkol?extParam=ivf%3Dfalse%26src%3Dsearch
16 Toren Air 1000L bh 1,050,000.00 https://www.tokopedia.com/jualkeperluansehari-hari/tangki-toren-tandon-air-1000-liter?extParam=ivf%3Dfalse%26src%3Dsearch
17 Toren Air 500L bh 640,000.00 https://www.tokopedia.com/imhome/tangki-toren-air-bca-500-liter-t550-murah-biru?extParam=ivf%3Dfalse%26src%3Dsearch
18 Pompa Air Shimizu 500 watt bh 3,575,000.00 https://www.tokopedia.com/lucky-star-88/pompa-air-jet-pump-shimizu-pc-503-bit-sumur-dalam-50-m-500-w-jetpump?extParam=ivf%3Dfalse%26src%3Dsearch
19 Pipa PVC AW 4 Inch btg 305,000.00
20 Pipa PVC AW 3 Inch btg 195,000.00
21 Pipa PVC AW 2 Inch btg https://www.tokopedia.com/snrsryplastindo/pipa-pvc-rucika-aw-4inch-pipa-peralon-rucika-aw-4inch?extParam=ivf%3Dfalse%26src%3Dsearch
96,000.00
22 Pipa PVC AW 1 1/4 Inch btg 68,000.00
23 Pipa PVC AW 3/4 Inch btg 33,000.00
24 Pipa PVC AW 1 Inch btg 48,110.00
25 Pipa PVC AW 1 1/2 Inch btg https://www.tokopedia.com/sssteelindo/pipa-rucika-wavin-putih-pvc-tipe-aw-tebal-1-2-3-4-6-inch-0-5-inch?extParam=ivf%3Dfalse%26src%3Dsearch
82,474.00
26 Pipa PVC AW 1/2 Inch btg 25,942.00

SARANA DAN PRASARANA


1 Pipa stainless steel dia. 2'' tebal 1,2 mm (Panjang 6 m) m1 86,580.00 https://abadimetalutama.com/daftar-harga-pipa-stainless-steel/
2 Pipa stainless steel dia. 2,5'' tebal 1,2 mm (Panjang 6 m) m1 108,810.00 https://abadimetalutama.com/daftar-harga-pipa-stainless-steel/
3 U-ditch 30x40x120 cm, t=5 cm bh 474,300.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 293
4 Tutup U-ditct 40x60 cm bh 200,000.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 293
5 Buis beton penuh dia 100 cm p=0,5 m bh 468,200.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 293
6 Buis beton penuh dia. dalam 150 cm p=0,5 m bh 795,940.00 Konversi
7 Paving block hexagon 8 cm m2 97,750.00
8 Kanstin DKI 14x30x40 K300 bh 58,000.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 293
9 Rumput gajah lempeng, mini 2 cm m2 25,000.00 https://www.indotrading.com/product/rumput-gajah-mini-p87135.aspx

Harga Material Page 114


NO JENIS BAHAN BANGUNAN SAT HARGA KETERANGAN

10 Ijuk per ikat ikat 46,700.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 277
11 Tiang Pancang SQ 25x25 cm m1 185,000.00 megaconbeton.com

BIAYA SEWA ALAT


1 Pompa Beton Standart >100 m3 m3 55,000.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 312
2 Dump Truck 3-4 m3, 100 HP, Kap. 6 T hari 250,000.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 312
3 Dump Truck 7-8m3 jam 150,000.00 https://buanakonstruksi.com/produk/sewa-alat-berat/
4 Mobile Crane Kap. 35 T jam 341,300.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 312
5 Crane 10-15 TON, 150 HP, Kap. 15 ton jam 500,000.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 312
6 Hydrolic Jacked Pilling System jam 625,000.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 312
7 Mesin Las jam 59,375.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 312
8 Stamper hari 550,000.00 https://www.tokopedia.com/anekasewajasa/sewa-stamper-kuda-cilandak-jakarta-selatan?extParam=ivf
%3Dfalse%26src%3Dsearch
9 Concrete Vibrator m3 12,500.00 Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 312
10 BBM non subsidi ltr 12,500.00
11 Jack Hammer hari 350,000.00 https://www.tokopedia.com/rumahperkakas76/sewa-jack-hammer?extParam=ivf%3Dfalse%26src%3Dsearch
12 Molen kap. 0,3 m3 300,000.00
13 Genset 5KW hr 350,000.00 https://www.tokopedia.com/sewagensetmesin/sewa-genset-5500watt?extParam=ivf%3Dfalse%26src
%3Dsearch
14 Pompa Air unit 834,730.00 https://www.tokopedia.com/shimizu/shimizu-water-pump-ps-130-bit?extParam=ivf%3Dfalse%26whid%3D13056835&src=topads
15 Chain saw hari 300,000.00
16 Sewa comprssor hari 450,000.00
17 Excavator pc200 jam 180,000.00 https://www.trek.id/
18 Bulldozer jam 225,000.00 https://www.trek.id/
LISTRIK DAN LAMPU
https://www.tokopedia.com/brickstore20/kabel-nymhy-nyyhy-3x2-5-3x2-5-100-meter-super-kabel-100-meter-
1 Kabel NYY 3x2,5 Supreme m1 13,131.10
putih?extParam=whid%3D7979277
https://www.tokopedia.com/andalan-shop/pipa-conduit-polos-20mm-pipa-listrik-polos-20mm-pipa-polos?
2 Pipa konduit brg 6,980.00
extParam=ivf%3Dfalse&src=topads
3 Mangkok lampu bh 25,000.00 HPS
4 Tee doos bh 700.00 https://www.tokopedia.com/staride-shop/te-tee-t-dus-dos-doos-tdus-tdos-tdoos-cabang-3-way-c-3-hitam-kecil-
5-8?extParam=ivf%3Dfalse%26src%3Dsearch
5 Clem Pipa bh 350.00 https://www.tokopedia.com/eghiegiatprima/clem-pipa-20mm?extParam=ivf%3Dfalse%26src
%3Dsearch&refined=true
6 Fshier bh 359.50 https://www.tokopedia.com/jirehautocare/fisher-sekrup-polystar-s5-s6-s8-s10-fiser-skrup-per-box-s10?
extParam=ivf%3Dfalse&src=topads
7 Lasdop bh 205.00 https://www.tokopedia.com/bumisariprismatama/lasdop-titton-lasdop-listrik-electrical-connector-spring?
extParam=ivf%3Dfalse%26src%3Dsearch
8 Isolasi Kabel 3M bh 6,500.00 https://www.tokopedia.com/sumbermulialed/3m-isolasi-listrik-1258-jr-original-1258jr-hitam-tape-kabel-asli-
ori?extParam=ivf%3Dfalse%26src%3Dsearch&refined=true
9 Kabel NYM 3x2,5 Eterna m1 15,500.00 https://www.tokopedia.com/kenzie-gold/kabel-eterna-3x-2-5-mm-meteran-eceran-potongan-nym-kawat-tembaga?extParam=ivf%3Dfalse%26src%3Dsearch
10 Kabel NYM 3x2,5 Shikoku SNI m1 9,113.70 https://www.tokopedia.com/brickstore20/kabel-nym-shikoku-3x2-5mm-100m-meter-3x2-5-100m-3-x-2-5-cable-3-x-2-5?extParam=whid%3D7979277
11 Lampu Essential 18 Watt Philips bh 34,000.00 https://www.tokopedia.com/andy-terus/lampu-philips-essential-18w-putih?extParam=ivf%3Dfalse%26src
%3Dsearch
https://www.tokopedia.com/sumberjayalampuid/philips-lampu-led-mycare-multipack-12w-10w-8w-6w-cahaya-
12 Lampu philips 12 watt mycare bh 32,625.00
putih-mycare-12-watt-d7b7?extParam=ivf%3Dfalse&src=topads
13 Fitting Standard bh 7,000.00 https://www.tokopedia.com/gka-elektrik/lampu-fitting-52201-panasonic-putih-e27?extParam=ivf
%3Dfalse&src=topads
14 Saklar 2 gang 2 way bh 23,298.00 https://www.tokopedia.com/gudanglistrik/panasonic-saklar-seri-hotel-2g-2w-5532-wide-series-putih-2-gang-2-
way
15 saklar 1 gang 1 way bh 14,260.00 https://www.tokopedia.com/gudanglistrik/saklar-engkel-single-1gang-1way-wej5531-ws-panasonic
16 saklar tunggal broco bh 10,980.00 https://www.tokopedia.com/gudanglistrik/broco-saklar-engkel-1g-galleo-g161-55s-white-tunggal-1-gang-1-way
17 Sock pipa conduit bh 350.00 https://www.tokopedia.com/smabanceuy/soket-pipa-listrik-20mm-putih-pack-isi-100-pcs-sok-konduit-conduit?
extParam=ivf%3Dfalse%26src%3Dsearch
https://www.tokopedia.com/tjelektrik/stop-kontak-panasonic-inbowtanam-flasimo-wcjp-1131?extParam=ivf
18 Stopkontak Panasonic bh 9,765.00
%3Dfalse%26src%3Dsearch
19 L Bow bh 1,200.00 https://www.tokopedia.com/camryjkt/elbow-knee-l-bow-20mm?extParam=ivf%3Dfalse%26src%3Dsearch
20 Kabel NYM 3x4 Eterna m1 25,000.00 https://www.tokopedia.com/kenzie-gold/kabel-listrik-nym-eterna-3x4-putih

21 Stop kontak bh 11,564.00 https://www.tokopedia.com/gudanglistrik/broco-stop-kontak-galleo-g151-55s-white-arde-socket

22 Stop kontak AC bh 29,700.00 https://www.tokopedia.com/gudanglistrik/broco-stop-kontak-ac-galleo-g155-55s-white-socket-3p-3pin

23 MCB semua Amperw bh 24,000.00 https://www.tokopedia.com/ktsp/mcb-chint-nxb-1p-6ka-1a-2a-4a-6a-10a-16a-20a-25a-32a-40a-50a-63a-20a?extParam=ivf%3Dfalse

24 MCB Shneider 6A bh 35,200.00 https://www.tokopedia.com/makmurjayakenarimas/mcb-schneider-1p-1phase-original-murah-mcb-schneider-6a-10a-16a-20a-6a?extParam=ivf%3Dfalse%26src%3D

25 Rumah MCB 2 Group BROCO bh 77,000.00 https://www.tokopedia.com/bason/broco-mcb-box-17102-kotak-mcb-1-2-group-outbow-mcb-panel-tempel?extParam=ivf%3Dfalse%26src%3Dsearch&refined=true

Subkon spandek atap pasir 225,000.00 https://www.tokopedia.com/windaanugrah/pemasangan-rangka-bajaringan-0-75-pull-atap-spandex-genteng-meta

Rolling Door Galvalume m2 350,000.00 https://www.tokopedia.com/arimatadoor/pintu-rolling-door-slat-galvalume?extParam=whid%3D8354412

Pipa PVC 4" btg 377,500.00 https://www.tokopedia.com/go-hardware/pipa-pvc-rucika-standard-aw-variant-4-meter-4

Lem Pipa tube 4,000.00 https://www.tokopedia.com/umkmkemasan/lem-pipa-pvc-dextone-40-grm?ref=wishlist

Rangka toren air m 1,010,000.00 https://www.tokopedia.com/solusimaterialbangunan/tiang-menara-toren-tangki-air-500-liter-t-3-meter?extParam=ivf%3Dfalse%26src%3Dsearch

Geotekstil 150 gr Non Woven (eceran) m2 8,000.00 https://www.tokopedia.com/geotekindopro/geotextile-non-woven-150-gr-eceran?extParam=whid%3D10709019

Geotekstil 150 gr Non Woven (1 Roll = 400m2) m2 6,250.00 https://www.tokopedia.com/geotekindopro/geotextile-non-woven-150-gr-rol?extParam=whid%3D10709019

Vendor pemasangan paving block https://mengaspal.com/jasa-pasang-paving-block-jakarta/

Vendor pengukuran tanah https://mengaspal.com/jasa-ukur-tanah/

Vendor Rangka Atap Baja Ringan 125,000.00 https://www.tokopedia.com/nagamastruss/pemasangan-rangka-atap-baja-ringan-galvalume-bergaransi-berpengalaman?extParam=ivf%3Dfalse%26src%3Dsearch

Kawat Bronjong Pabrikasi unit 150,000.00

Plastik Cor Hijau tebal 0,6mm (7KG) kg 10,198.43 https://www.tokopedia.com/indokaryaabadi/gojek-grab-plastik-cor-hijau-butek-5-6-7-kilogram-termurah-tebal-cor-hijau-7kg?extParam=ivf%3Dfalse%26src%3Dsearc

Harga Material Page 115


HARGA DASAR SATUAN UPAH
PERGUB DKI NO 10 TAHUN 2020 & PERGUB DKI NO1153 TAHUN 2022
Harga Satuan (Rp.)
No. Tenaga Kerja Kode Satuan Keterangan
Jam Hari

1 Pekerja L.01 OH Rp. 21,800.00 Rp. 174,748.00


2 Tukang L.02 OH Rp. 22,900.00 Rp. 183,834.00
3 Tukang Gali L.02 OH Rp. 22,900.00 Rp. 183,834.00
4 Tukang Batu L.02 OH Rp. 22,900.00 Rp. 183,834.00
5 Tukang Kayu L.02 OH Rp. 22,900.00 Rp. 183,834.00
6 Tukang Besi L.02 OH Rp. 22,900.00 Rp. 183,834.00
7 Tukang Cat / Pelitur L.02 OH Rp. 22,900.00 Rp. 183,834.00
8 Tukang Pipa / Operator Pompa L.02 OH Rp. 22,900.00 Rp. 183,834.00
9 Tukang Pengayam Bronjong L.02 OH Rp. 22,900.00 Rp. 183,834.00
10 Tukang Tebas L.02 OH Rp. 22,900.00 Rp. 183,834.00
11 Kepala Tukang L.03 OH Rp. 24,900.00 Rp. 199,782.00
12 Mandor L.04 OH Rp. 26,400.00 Rp. 211,379.00
13 Instalator L.05 OH Rp. 24,900.00 Rp. 199,782.00
14 Pembantu Juru Ukur L.06 OH Rp. 22,900.00 Rp. 183,834.00
15 Ahli Alat Berat ( Mekanik ) L.07 OH Rp. 26,400.00 Rp. 211,379.00
16 Operator L.08 OH Rp. 26,400.00 Rp. 211,379.00
17 Pembantu Operator L.09 OH Rp. 21,800.00 Rp. 174,748.00
18 Sopir Truck L.10 OH Rp. 26,400.00 Rp. 211,379.00
19 Kenek Truk L.11 OH Rp. 21,800.00 Rp. 174,748.00
20 Tukang Pasang Pipa OH Rp. 22,900.00 Rp. 183,834.00
21 Kepala Tukang Pipa OH Rp. 24,900.00 Rp. 199,782.00
22 Tukang Las OH Rp. 22,900.00 Rp. 183,834.00
23 Operator Printer/Plotter L.16 OH Rp. 26,400.00 Rp. 211,379.00
ANALISA HARGA SATUAN

HARGA SATUAN JUMLAH HARGA


NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

PENETAPAN INDEKS HARGA SATUAN PEKERJAAN PERSIAPAN

1 1 unit Papan nama proyek uk. 120 x 240 cm

Multiplek 9mm lbr 1.0000 81,000.00 81,000.00

Kayu kelas II m3 0.0770 - -


Bahan
Paku 5-7cm kg 1.2500 - -

Cat kayu kg 2.5000 - -

Pekerja oh 1.0000 185,674.16 185,674.16

Tukang kayu oh 1.0000 189,845.00 189,845.00

Tenaga Tukang cat/tulis oh 1.5000 189,845.00 284,767.50

Kepala tukang oh 0.1000 206,315.00 20,631.50

Mandor oh 0.1000 218,291.00 21,829.10

Jumlah 783,747.26

Keuntungan Mak. 12% 78,374.73

Jumlah + Keuntungan 862,121.99

Dibulatkan 862,100.00

1 set Foto dokumentasi menggunakan kamera digital tanpa film


2
(jika menggunakan kamera digital, untuk dokumentasinya dg CD dan album foto)

CD copy soft file foto image bh 3.0000 - -

Bahan Cetak foto lbr 80.0000 - -

Album foto ls 1.0000 - -

Tenaga Tukang foto oh 1.0000 206,315.00 206315

Peralatan Kamera DSLR Sewa/hari 1.0000 50,000.00 50,000.00

Jumlah 256,315.00

Keuntungan Mak. 12% 25,631.50

Jumlah + Keuntungan 281,946.50

Dibulatkan 281,900.00

3 1 m2 Pembuatan kantor direksi keet sementara dengan lantai plesteran

Kayu laut/dolken Ø 8-10/400 cm btg 1.2500 1,500,000.00 1,875,000.00

Kayu m3 0.1800 - -

Paku biasa kg 0.0800 - -

Besi strip kg 1.1000 124,000.00 136,400.00

Semen portland kg 35.0000 1,420.00 49,700.00

Pasir pasang m3 0.1500 235,000.00 35,250.00

Pasir beton m3 0.1000 280,000.00 28,000.00


Bahan
Koral beton m3 0.1500 210,000.00 31,500.00

Bata merah bh 30.0000 410.00 12,300.00

Seng Plat lbr 0.2500 - -

Jendela nako bh 0.2000 250,000.00 50,000.00

Kaca Polos m2 0.0800 - -

Kunci tanam bh 0.1500 - -

Plywood 4 mm lbr 0.0600 - -

Pekerja oh 2.0000 185,674.16 371,348.32

Tukang kayu oh 2.0000 189,845.00 379,690.00

Tenaga Tukang batu oh 1.0000 189,845.00 189,845.00

Kepala tukang oh 0.3000 206,315.00 61,894.50

Mandor oh 0.0500 218,291.00 10,914.55

Analisa Struktur Arsitektur Page 117


HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

Jumlah 3,231,842.37

Keuntungan Mak. 12% 323,184.24

Jumlah + Keuntungan 3,555,026.61

Dibulatkan 3,555,000.00

4 1 m2 Pembuatan gudang semen dan alat-alat

Kayu laut/dolken Ø 8-10/400 cm btg 1.7000 1,500,000.00 2,550,000.00

Kayu m3 0.2100 - -

Paku biasa kg 0.3000 - -

Semen portland kg 10.5000 - -


Bahan
Pasir beton m3 0.0300 280,000.00 8,400.00

Koral beton m3 0.0500 210,000.00 10,500.00

Seng gelombang bjls 20 - 7" lbr 1.5000 - -

Multiplek Uk. 122 x 244 x 9 mm lbr 1.3500 - -

Pekerja oh 1.0000 185,674.16 185,674.16

Tukang kayu oh 2.0000 189,845.00 379,690.00


Tenaga
Kepala tukang oh 0.2000 206,315.00 41,263.00

Mandor oh 0.0500 211,379.00 10,568.95

Jumlah 3,186,096.11

Keuntungan Mak. 12% 318,609.61

Jumlah + Keuntungan 3,504,705.72

Dibulatkan 3,504,700.00

5 1 m1 Pagar sementara dari seng gelombang tinggi 2 meter

Kayu Laut/Dolken Ø 8-10/400 cm btg 1.2500 1,500,000.00 1,875,000.00

Semen Portland kg 2.5000 - -

Seng Gelombang lbr 1.2000 - -

Pasir beton m3 0.0050 280,000.00 1,400.00


Bahan
Koral beton m3 0.0090 210,000.00 1,890.00

Kayu 5/7 m3 0.0720 - -

Paku biasa 2" - 5" kg 0.0600 - -

Meni Besi kg 0.4500 - -

Pekerja oh 0.2000 185,674.16 37,134.83

Tukang kayu oh 0.4000 189,845.00 75,938.00


Tenaga
Kepala tukang oh 0.0200 206,315.00 4,126.30

Mandor oh 0.0200 218,291.00 4,365.82

Jumlah 1,999,854.95

Keuntungan Mak. 10% 199,985.50

Jumlah + Keuntungan 2,199,840.45

Dibulatkan 2,199,800.00

5 1 m2 Pembuatan bedeng pekerja dengan lantai plesteran

Kayu kaso 5/7 m3 0.1800 - -

Paku biasa kg 0.3000 - -

Semen portland kg 18.0000 - -

Pasir beton m3 0.0300 280,000.00 8,400.00


Bahan
Koral beton m3 0.0500 210,000.00 10,500.00

Seng gelombang bjls 20 - 7" lbr 1.5000 - -

Multiplek Uk. 122 x 244 x 9 mm lbr 1.3500 - -

Kunci tanam bh 1.0000 - -

Pekerja oh 2.0000 185,674.16 371,348.32

Tukang kayu oh 2.0000 189,845.00 379,690.00

Tenaga
Analisa Struktur Arsitektur Page 118
HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

Tenaga Tukang batu oh 1.0000 189,845.00 189,845.00

Kepala tukang oh 0.3000 206,315.00 61,894.50

Mandor oh 0.0500 218,291.00 10,914.55

Jumlah 1,032,592.37

Keuntungan Mak. 12% 103,259.24

Jumlah + Keuntungan 1,135,851.61

Dibulatkan 1,135,800.00

6 1 set Sewa, pasang & bongkar scafolding

Bahan Sewa scafolding set/bulan 1.0000 52,000.00 52,000.00

Pekerja oh 0.2500 185,674.16 46,418.54


Tenaga
Mandor oh 0.0150 218,291.00 3,274.37

Jumlah 101,692.91

Keuntungan Mak. 12% 10,169.29

Jumlah + Keuntungan 111,862.20

Dibulatkan 111,800.00

7 1 m2 Pembuatan Stegger dari bambu, ukuran (40 x 50 x 20) cm.

Bambu Ǿ 6-8/600 cm Btg 1.0000 - -


Bahan
Tali tajuk Kg 0.2500 - -

Pekerja oh 0.2500 185,674.16 46,418.54

Tukang kayu oh 0.0170 189,845.00 3,227.37


Tenaga
Kepala tukang oh 0.0020 206,315.00 412.63

Mandor oh 0.0130 218,291.00 2,837.78

Jumlah 52,896.32

Keuntungan Mak. 12% 5,289.63

Jumlah + Keuntungan 58,185.95

Dibulatkan 58,100.00

8 1 m1 Pengukuran dan pemasangan bowplank

Kayu Balok m3 0.0120 - -

Bahan Paku 4 cm s/d 7 cm kg 0.0200 - -

Kayu Papan m3 0.0070 - -

Pekerja oh 0.1000 185,674.16 18,567.42

Tukang kayu oh 0.1000 189,845.00 18,984.50


Tenaga
Kepala tukang oh 0.0100 206,315.00 2,063.15

Mandor oh 0.0050 218,291.00 1,091.46

Jumlah 40,706.52

Keuntungan Mak. 12% 4,070.65

Jumlah + Keuntungan 44,777.17

Dibulatkan 44,700.00

PENETAPAN INDEKS HARGA SATUAN PEKERJAAN BONGKARAN & BUANGAN

1 1 m3 Bongkaran beton bertulang

Pekerja oh 13.3340 185,674.16 2,475,779.25


Tenaga
Mandor oh 0.6660 218,291.00 145,381.81

Jumlah 2,621,161.06

Keuntungan Mak. 10% 262,116.11

Jumlah + Keuntungan 2,883,277.16

Dibulatkan 2,883,200.00

Analisa Struktur Arsitektur Page 119


HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

2 1 m2 Bongkaran Dinding Bata Merah + Kolom Praktis

Pekerja oh 0.2000 185,674.16 37,134.83


Tenaga
Mandor oh 0.0200 218,291.00 4,365.82

Jumlah 41,500.65

Keuntungan Mak. 10% 4,150.07

Jumlah + Keuntungan 45,650.72

Dibulatkan 45,600.00

3 1 m2 Bongkaran Lantai Keramik Sampai Permukaan Tanah

Pekerja oh 0.2000 185,674.16 37,134.83


Tenaga
Mandor oh 0.0250 218,291.00 5,457.28

Jumlah 42,592.11

Keuntungan Mak. 10% 4,259.21

Jumlah + Keuntungan 46,851.32

Dibulatkan 46,800.00

9 1 m3 Buang Puing/Tanah Keluar Site

Tenaga Upah bongkar muat rit 1.0000 25,000.00 25,000.00

Alat Sewa truck kap. 4 m3 + sopir + bbm rit 1.0000 250,000.00 250,000.00

Jumlah 275,000.00

Jumlah (untuk 1 m3) 68,750.00

Keuntungan Mak. 12% 6,875.00

Jumlah + Keuntungan 75,625.00

Dibulatkan 75,600.00

10 Pembersihan & buang puing berkala

Pembersihan hr 24.0000 185,674.16 4,456,179.84


Tenaga dan Alat
Buang puing m3 72.0000 68,750.00 4,950,000.00

Jumlah 9,406,179.84

Keuntungan Mak. 12% 940,617.98

Jumlah + Keuntungan 10,346,797.82

Dibulatkan 10,346,700.00

PENETAPAN INDEKS HARGA SATUAN PEKERJAAN TANAH

1 1 m3 Galian tanah biasa sedalam 1 meter

Pekerja oh 0.2200 185,674.16 40,848.32


Tenaga
Mandor oh 0.0220 218,291.00 4,802.40

Bahan BBM non subsidi ltr 0.5000 - -

Alat Jack hammer sewa hari 0.0050 - -

Jumlah 45,650.72

Keuntungan Mak. 12% 4,565.07

Jumlah + Keuntungan 50,215.79

Dibulatkan 50,200.00

4 1 m3 Buang Puing/Tanah Keluar Site

Pekerja oh 0.5000 185,674.16 92,837.08


Tenaga
Mandor oh 0.0500 218,291.00 10,914.55

Analisa Struktur Arsitektur Page 120


HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

Alat stamper sewa harian 0.0500 - -

Jumlah 103,751.63

Keuntungan Mak. 12% 10,375.16

Jumlah + Keuntungan 114,126.79

Dibulatkan 114,100.00

2 1 m3 Galian tanah biasa sedalam 2 meter

Pekerja oh 0.9000 185,674.16 167,106.74


Tenaga
Mandor oh 0.0450 218,291.00 9,823.10

Jumlah 176,929.84

Keuntungan Mak. 12% 17,692.98

Jumlah + Keuntungan 194,622.82

Dibulatkan 194,600.00

3 1 m3 Galian tanah biasa sedalam 3 meter

Pekerja oh 1.0500 185,674.16 194,957.87


Tenaga
Mandor oh 0.0670 218,291.00 14,625.50

Jumlah 209,583.37

Keuntungan Mak. 12% 20,958.34

Jumlah + Keuntungan 230,541.70

Dibulatkan 230,500.00

4 1 m3 Urugan tanah kembali bekas galian tanah biasa sedalam 1 meter

Pekerja oh 0.3300 185,674.16 61,272.47


Tenaga
Mandor oh 0.0330 218,291.00 7,203.60

Jumlah 68,476.08

Keuntungan Mak. 12% 6,847.61

Jumlah + Keuntungan 75,323.68

Dibulatkan 75,300.00

5 1 m3 Urugan tanah kembali bekas galian tanah biasa sedalam 2 meter

Pekerja oh 0.3000 185,674.16 55,702.25


Tenaga
Mandor oh 0.0150 218,291.00 3,274.37

Jumlah 58,976.61

Keuntungan Mak. 12% 5,897.66

Jumlah + Keuntungan 64,874.27

Dibulatkan 64,800.00

6 1 m3 Urugan tanah kembali bekas galian tanah biasa sedalam 3 meter

Pekerja oh 0.3500 185,674.16 64,985.96


Tenaga
Mandor oh 0.0223 218,291.00 4,875.17

Jumlah 69,861.12

Keuntungan Mak. 12% 6,986.11

Jumlah + Keuntungan 76,847.23

Dibulatkan 76,800.00

7 1 m3 Pembuangan tanah sejauh 30 meter

Pekerja oh 0.3300 185,674.16 61,272.47


Tenaga
Mandor oh 0.0100 218,291.00 2,182.91

Analisa Struktur Arsitektur Page 121


HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

Jumlah 63,455.38

Keuntungan Mak. 12% 6,345.54

Jumlah + Keuntungan 69,800.92

Dibulatkan 69,800.00

1 m3 Pemadatan tanah dengan stamper

Pekerja oh 0.5000 185,674.16 92,837.08


Tenaga
Mandor oh 0.0500 218,291.00 10,914.55

Peralatan Stamper sewa hari 0.0500 - -

Jumlah 103,751.63

Keuntungan Mak. 10% 10,375.16

Jumlah + Keuntungan 114,126.79

Dibulatkan 114,100.00

8 1 m3 Urugan tanah merah

Bahan Tanah merah m3 1.2000 - -

Pekerja oh 0.3300 185,674.16 61,272.47


Tenaga
Mandor oh 0.0100 218,291.00 2,182.91

Jumlah 63,455.38

Keuntungan Mak. 12% 6,345.54

Jumlah + Keuntungan 69,800.92

Dibulatkan 69,800.00

9 1 m3 Urugan pasir

Bahan Pasir urug m3 1.2000 - -

Pekerja oh 0.4000 185,674.16 74,269.66


Tenaga
Mandor oh 0.0400 218,291.00 8,731.64

Jumlah 83,001.30

Keuntungan Mak. 12% 8,300.13

Jumlah + Keuntungan 91,301.43

Dibulatkan 91,300.00

10 1 m3 Urugan sirtu padat

Bahan Pasir urug m3 1.2000 210,000.00 252,000.00

Pekerja oh 0.3000 185,674.16 55,702.25


Tenaga
Mandor oh 0.0100 218,291.00 2,182.91

Jumlah 309,885.16

Keuntungan Mak. 12% 30,988.52

Jumlah + Keuntungan 340,873.67

Dibulatkan 340,800.00

1 titik Cerucuk Dolken dia. 8 cm Kedalaman 250 cm

Bahan Dolken dia. 6-8 cm, 400 cm btg 0.7143 1,500,000.00 1,071,428.57

Pekerja oh 0.5000 185,674.16 92,837.08

Tenaga Tukang batu oh 0.1750 189,845.00 33,222.88

Mandor oh 0.0337 218,291.00 7,349.13

Jumlah 1,204,837.66

Keuntungan Mak. 10% 120,483.77

Jumlah + Keuntungan 1,325,321.42

Dibulatkan 1,325,300.00

1 1 m3 Pasangan batu belah ad. 1 pc : 4 ps

Analisa Struktur Arsitektur Page 122


HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

Semen portland kg 163.0000 - -

Bahan Pasir pasang m3 0.5200 - -

Batu belah m3 1.2000 - -

Pekerja oh 1.5000 185,674.16 278,511.24

Tukang batu oh 0.7500 189,845.00 142,383.75


Tenaga
Kepala tukang oh 0.0750 206,315.00 15,473.63

Mandor oh 0.0750 218,291.00 16,371.82

Jumlah 452,740.44

Keuntungan Mak. 12% 45,274.04

Jumlah + Keuntungan 498,014.48

Dibulatkan 498,000.00

11 1 m3 Pasangan batu belah ad. 1 pc : 5 ps

Semen portland kg 136.0000 - -

Bahan Pasir pasang m3 0.5440 235,000.00 127,840.00

Batu belah m3 1.2000 245,000.00 294,000.00

Pekerja oh 1.5000 185,674.16 278,511.24

Tukang batu oh 0.7500 189,845.00 142,383.75


Tenaga
Kepala tukang oh 0.0750 206,315.00 15,473.63

Mandor oh 0.0750 218,291.00 16,371.82

Jumlah 874,580.44

Keuntungan Mak. 12% 87,458.04

Jumlah + Keuntungan 962,038.48

Dibulatkan 962,000.00

PENETAPAN INDEKS HARGA SATUAN PEKERJAAN PONDASI PANCANG

1 1 m1 Penyediaan Tiang Pancang Beton Persegi Masif, SQ 25x25 cm

Tiang Pancang SQ 25x25 cm Class A m1 1.0500 - -

Dump Truck 3-4 m³, 100 HP, Kap. 6 ton jam 0.0433 - -
Bahan
Crane 10-15 TON, 150 HP, Kap. 15 ton jam 0.0335 - -

Alat Bantu ls 1.0000 1,000.00 1,000.00

Pekerja o.j 0.3347 26,524.88 8,877.14

Tenaga Tukang batu o.j 0.0669 27,120.71 1,815.31

Mandor o.j 0.0335 31,184.43 1,043.66

Jumlah 12,736.10

Keuntungan Mak. 12% 1,273.61

Jumlah + Keuntungan 14,009.71

Dibulatkan 14,000.00

2 1 m1 Pemancangan Tiang Pancang Beton Persegi Masif, SQ 25x25 cm

Mobile Crane 35 ton jam 0.1908 - -

Bahan Hydrolic Jacked Pilling System jam 0.0703 - -

Alat Bantu ls 1.0000 1,000.00 1,000.00

Pekerja o.j 1.6867 26,524.88 44,740.76

Tenaga Tukang batu o.j 0.4217 27,120.71 11,436.45

Mandor o.j 0.2108 31,184.43 6,575.03

Jumlah 63,752.24

Keuntungan Mak. 12% 6,375.22

Jumlah + Keuntungan 70,127.46

Dibulatkan 70,100.00

Analisa Struktur Arsitektur Page 123


HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

1 titik Penyambungan dan Pengelasan Tiang Pancang

Penyambung baja/plat baja penyambung kg 4.9063 165,786.02 813,387.67


Bahan & Tenaga
Pengelasan cm 100.0000 1,500.00 150,000.00

Jumlah 963,387.67

Keuntungan Mak. 10% 96,338.77

Jumlah + Keuntungan 1,059,726.44

Dibulatkan 1,059,700.00

PENETAPAN INDEKS HARGA SATUAN PEKERJAAN BETON

1 1 m3 Lantai Kerja Beton mutu f’c = 9,8 MPa (K 100)

Semen portland kg 247.0000 - -

Pasir beton m3 0.6210 280,000.00 173,880.00


Bahan
Batu pecah 2/3 cm m3 0.7400 210,000.00 155,400.00

Air ltr 215.0000 17.58 3,779.70

Pekerja oh 1.3230 185,674.16 245,646.91

Tukang batu oh 0.1890 189,845.00 35,880.71


Tenaga
Kepala tukang oh 0.0190 206,315.00 3,919.99

Mandor oh 0.1320 218,291.00 28,814.41

Peralatan Molen kap 0,3 m3 hari 0.2500 - -

Jumlah 647,321.72

Keuntungan Mak. 12% 64,732.17

Jumlah + Keuntungan 712,053.89

Dibulatkan 712,000.00

2 1 m3 Beton mutu f’c = 9,8 MPa (K175)

Semen portland kg 326.0000 - -

Pasir beton kg 760.0000 200.00 152,000.00


Bahan
Batu pecah 2/3 cm kg 1,029.0000 - -

Air ltr 215.0000 17.58 3,779.70

Pekerja oh 1.6500 185,674.16 306,362.36

Tukang batu oh 0.2750 189,845.00 52,207.38


Tenaga
Kepala tukang oh 0.0280 206,315.00 5,776.82

Mandor oh 0.0830 218,291.00 18,118.15

Peralatan Molen kap 0,3 m3 hari 0.2500 - -

Jumlah 538,244.41

Keuntungan Mak. 12% 53,824.44

Jumlah + Keuntungan 592,068.85

Dibulatkan 592,000.00

1 1 m3 Beton mutu f'c = 26,4 Mpa (K 250)

Semen portland kg 384.0000 - -

Pasir beton kg 692.0000 200.00 138,400.00


Bahan
split 2/3 kg 1,039.0000 - -

Air ltr 215.0000 17.58 3,779.70

Pekerja oh 1.3230 185,674.16 245,646.91

Tukang batu oh 0.1890 189,845.00 35,880.71


Tenaga
Kepala tukang oh 0.0190 206,315.00 3,919.99

Mandor oh 0.1320 218,291.00 28,814.41

Peralatan Molen kap 0,3 m3 hari 0.2500 - -

Analisa Struktur Arsitektur Page 124


HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

Jumlah 456,441.72

Keuntungan Mak. 12% 45,644.17

Jumlah + Keuntungan 502,085.89

Dibulatkan 502,000.00

3 1 m3 Beton mutu f'c = 26,4 Mpa (K 300)

Semen portland kg 413.0000 - -

Pasir beton kg 681.0000 200.00 136,200.00


Bahan
Batu pecah 2/3 cm kg 1,021.0000 - -

Air ltr 215.0000 17.58 3,779.70

Pekerja oh 1.6500 185,674.16 306,362.36

Tukang batu oh 0.2750 189,845.00 52,207.38


Tenaga
Kepala tukang oh 0.0280 206,315.00 5,776.82

Mandor oh 0.0830 218,291.00 18,118.15

Jumlah 522,444.41

Keuntungan Mak. 12% 52,244.44

Jumlah + Keuntungan 574,688.85

Dibulatkan 574,600.00

4 1 m3 Material Grouting tanpa Campuran (exclude Tenaga)

Semen grouting kg 1,850.0000 472.00 873,200.00


Bahan
Air ltr 400.0000 17.58 7,032.00

Jumlah 880,232.00

Keuntungan Mak. 12% 88,023.20

Jumlah + Keuntungan 968,255.20

Dibulatkan 968,200.00

5 1 titik Pekerjaan Grouting Joint Beton (Tenaga tanpa Material)

Tukang batu oh 0.3670 189,845.00 69,673.12

Tenaga Kepala tukang oh 0.0740 206,315.00 15,267.31

Mandor oh 0.0370 218,291.00 8,076.77

Jumlah 93,017.19

Keuntungan Mak. 12% 9,301.72

Jumlah + Keuntungan 102,318.91

Dibulatkan 102,300.00

6 1 kg Pembesian dengan besi polos/ulir (plat lantai)

Besi beton polos/ulir kg 1.0500 - -


Bahan
Kawat beton kg 0.0150 - -

Pekerja oh 0.0070 185,674.16 1,299.72

Tukang besi oh 0.0070 189,845.00 1,328.92


Tenaga
Kepala tukang oh 0.0007 - -

Mandor oh 0.0007 218,291.00 152.80

Jumlah 2,781.44

Keuntungan Mak. 15% 417.22

Jumlah + Keuntungan 3,198.65

Dibulatkan 3,100.00

1 1 kg Pembesian dengan besi polos/ulir (umum)

Besi beton polos/ulir kg 1.0500 - -


Bahan
Kawat beton kg 0.0210 - -

Pekerja oh 0.0070 185,674.16 1,299.72

Tenaga Analisa Struktur Arsitektur Page 125


HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

Tukang besi oh 0.0070 189,845.00 1,328.92


Tenaga
Kepala tukang oh 0.0007 - -

Mandor oh 0.0004 218,291.00 87.32

Jumlah 2,715.95

Keuntungan Mak. 15% 407.39

Jumlah + Keuntungan 3,123.34

Dibulatkan 3,100.00

1 1 kg Pembesian dengan besi polos/ulir (kolom, balok, ring balok, sloof)

Besi beton polos/ulir kg 1.0500 - -


Bahan
Kawat beton kg 0.0150 - -

Pekerja oh 0.0210 185,674.16 3,899.16

Tukang besi oh 0.0140 189,845.00 2,657.83


Tenaga
Kepala tukang oh 0.0014 - -

Mandor oh 0.0021 218,291.00 458.41

Jumlah 7,015.40

Keuntungan Mak. 15% 1,052.31

Jumlah + Keuntungan 8,067.71

Dibulatkan 8,000.00

7 10 kg Pemasangan jaring kawat baja (wiremesh)

Jaring kawat baja/wiremesh kg 10.2000 - -


Bahan
Kawat beton kg 0.0500 - -

Pekerja oh 0.0250 185,674.16 4,641.85

Tukang besi oh 0.0250 189,845.00 4,746.13


Tenaga
Kepala tukang oh 0.0250 - -

Mandor oh 0.0010 218,291.00 218.29

Jumlah 9,606.27

Keuntungan Mak. 12% 960.63

Jumlah + Keuntungan 10,566.90

Dibulatkan 10,500.00

8 1 kg Pembesian dengan Besi IWF/ HB

Bahan Besi IWF / HB kg 1.1500 - -

Pekerja oh 0.0600 185,674.16 11,140.45

Tukang besi oh 0.0600 189,845.00 11,390.70


Tenaga
Kepala tukang oh 0.0060 - -

Mandor oh 0.0030 218,291.00 654.87

Jumlah 23,186.02

Keuntungan Mak. 12% 2,318.60

Jumlah + Keuntungan 25,504.62

Dibulatkan 25,500.00

9 1 kg Pembesian dengan Besi Plat

Bahan Besi Plat kg 1.1500 124,000.00 142,600.00

Pekerja oh 0.0600 185,674.16 11,140.45

Tukang besi oh 0.0600 189,845.00 11,390.70


Tenaga
Kepala tukang oh 0.0060 - -

Mandor oh 0.0030 218,291.00 654.87

Jumlah 165,786.02

Keuntungan Mak. 12% 16,578.60

Jumlah + Keuntungan 182,364.62

Analisa Struktur Arsitektur Page 126


HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

Dibulatkan 182,300.00

100 kg Pekerjaan Perakitan/Erection

Solar ltr 0.3000 10,000.00 3,000.00


Bahan
Minyak pelumas ltr 0.0400 30,000.00 1,200.00

Pekerja oh 0.0400 185,674.16 7,426.97

Tukang baja oh 0.0200 189,845.00 3,796.90


Tenaga
Kepala tukang oh 0.0020 - -

Mandor oh 0.0020 218,291.00 436.58

Alat Sewa Alat/Mobil Crane 10-15 T jam 0.1700 487,500.00 82,875.00

Jumlah 98,735.45

Keuntungan Mak. 10% 9,873.54

Jumlah + Keuntungan 108,608.99

Dibulatkan 108,600.00

10 1 m2 Bekisting pondasi

Kayu kelas III m3 0.0400 - -

Bahan Paku biasa 5 - 12 cm kg 0.3000 - -

Minyak bekisting ltr 0.1000 - -

Pekerja oh 0.5200 185,674.16 96,550.56

Tukang kayu oh 0.2600 189,845.00 49,359.70


Tenaga
Kepala tukang oh 0.0260 206,315.00 5,364.19

Mandor oh 0.0260 218,291.00 5,675.57

Jumlah 156,950.02

Keuntungan Mak. 10% 15,695.00

Jumlah + Keuntungan 172,645.02

Dibulatkan 172,600.00

1 m2 Bekisting sloof/ring balok/kolom praktis (2x pakai)

Kayu kelas III m3 0.0225 - -

Bahan Paku biasa 5 - 12 cm kg 0.1500 - -

Minyak bekisting ltr 0.0500 - -

Pekerja oh 0.2600 185,674.16 48,275.28

Tukang kayu oh 0.1300 189,845.00 24,679.85


Tenaga
Kepala tukang oh 0.0130 206,315.00 2,682.10

Mandor oh 0.0130 218,291.00 2,837.78

Jumlah 78,475.01

Keuntungan Mak. 10% 7,847.50

Jumlah + Keuntungan 86,322.51

Dibulatkan 86,300.00

10 1 m2 Bekisting sloof/ring balok/kolom praktis (1x pakai)

Kayu kelas III m3 0.0450 - -

Bahan Paku biasa 5 - 12 cm kg 0.3000 - -

Minyak bekisting ltr 0.1000 - -

Pekerja oh 0.5200 185,674.16 96,550.56

Tukang kayu oh 0.2600 189,845.00 49,359.70


Tenaga
Kepala tukang oh 0.0260 206,315.00 5,364.19

Mandor oh 0.0260 218,291.00 5,675.57

Jumlah 156,950.02

Keuntungan Mak. 12% 15,695.00

Jumlah + Keuntungan 172,645.02

Analisa Struktur Arsitektur Page 127


HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

Dibulatkan 172,600.00

1 m2 Bekisting kolom (2x pakai)

Kayu kelas III m3 0.0200 - -

Paku biasa 5 - 12 cm kg 0.2000 - -

Minyak bekisting ltr 0.1000 - -


Bahan
Balok Kayu sembarang, albasia m3 0.0075 - -

Tripleks tebal 9 mm lbr 0.1750 - -

Kayu dolken dia. 8 cm/4 m btg 1.0000 1,500,000.00 1,500,000.00

Pekerja oh 0.3300 185,674.16 61,272.47

Tukang kayu oh 0.1650 189,845.00 31,324.43


Tenaga
Kepala tukang oh 0.0165 206,315.00 3,404.20

Mandor oh 0.0165 218,291.00 3,601.80

Jumlah 1,599,602.90

Keuntungan Mak. 10% 159,960.29

Jumlah + Keuntungan 1,759,563.19

Dibulatkan 1,759,500.00

1 1 m2 Bekisting Pondasi 3x pakai (Kolom, Balok, Sloof)

Multiplek 12 mm atau 18 mm lbr 0.1280 - -

Kaso 5/7 m3 0.0090 - -


Bahan
Paku biasa 5 - 12 cm kg 0.2500 - -

Minyak bekisting l 0.2000 - -

Pekerja oh 0.2000 185,674.16 37,134.83

Tukang kayu oh 0.1000 189,845.00 18,984.50


Tenaga
Kepala tukang oh 0.0100 206,315.00 2,063.15

Mandor oh 0.0200 218,291.00 4,365.82

Jumlah 62,548.30

Keuntungan Mak. 12% 6,254.83

Jumlah + Keuntungan 68,803.13

Dibulatkan 68,800.00

1 1 m2 Bekisting Pondasi 2x pakai (Kolom, Balok, Sloof)

Multiplek 12 mm atau 18 mm lbr 0.2030 - -

Kaso 5/7 m3 0.0160 - -


Bahan
Paku biasa 5 - 12 cm kg 0.2500 - -

Minyak bekisting l 0.2000 - -

Pekerja oh 0.2000 185,674.16 37,134.83

Tukang kayu oh 0.1000 189,845.00 18,984.50


Tenaga
Kepala tukang oh 0.0100 206,315.00 2,063.15

Mandor oh 0.0200 218,291.00 4,365.82

Jumlah 62,548.30

Keuntungan Mak. 12% 6,254.83

Jumlah + Keuntungan 68,803.13

Dibulatkan 68,800.00

1 1 m2 Bekisting Pondasi 1x pakai (Kolom, Balok, Sloof)

Multiplek 12 mm atau 18 mm lbr 0.3530 - -

Kaso 5/7 m3 0.0290 - -


Bahan
Paku biasa 5 - 12 cm kg 0.2500 - -

Minyak bekisting l 0.2000 - -

Pekerja oh 0.2000 185,674.16 37,134.83

Tenaga Analisa Struktur Arsitektur Page 128


HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

Tukang kayu oh 0.1000 189,845.00 18,984.50


Tenaga
Kepala tukang oh 0.0100 206,315.00 2,063.15

Mandor oh 0.0200 218,291.00 4,365.82

Jumlah 62,548.30

Keuntungan Mak. 12% 6,254.83

Jumlah + Keuntungan 68,803.13

Dibulatkan 68,800.00

11 1 m2 Bekisting kolom (1x pakai)

Kayu kelas III m3 0.0400 - -

Paku biasa 5 - 12 cm kg 0.4000 - -

Minyak bekisting ltr 0.2000 - -


Bahan
Balok Kayu sembarang, albasia m3 0.0150 - -

Tripleks tebal 9 mm lbr 0.3500 - -

Kayu dolken dia. 8 cm/4 m btg 2.0000 1,500,000.00 3,000,000.00

Pekerja oh 0.6600 185,674.16 122,544.95

Tukang kayu oh 0.3300 189,845.00 62,648.85


Tenaga
Kepala tukang oh 0.0330 206,315.00 6,808.40

Mandor oh 0.0330 218,291.00 7,203.60

Jumlah 3,199,205.79

Keuntungan Mak. 12% 319,920.58

Jumlah + Keuntungan 3,519,126.37

Dibulatkan 3,519,100.00

12 1 m2 Bekisting Dinding (1x pakai)

Kayu kelas III m3 0.0400 - -

Paku biasa 5 - 12 cm kg 0.4000 - -

Minyak bekisting ltr 0.2000 - -

Bahan Balok Kayu sembarang, albasia m3 0.0150 - -

Tripleks tebal 9 mm lbr 0.3500 - -

Kayu dolken dia. 8 cm/4 m btg 6.0000 1,500,000.00 9,000,000.00

Formtie/ penjaga jarak bekisting bh 4.0000 50,000.00 200,000.00

Pekerja oh 0.3200 185,674.16 59,415.73

Tukang kayu oh 0.3300 189,845.00 62,648.85


Tenaga
Kepala tukang oh 0.0330 206,315.00 6,808.40

Mandor oh 0.0060 218,291.00 1,309.75

Jumlah 9,330,182.72

Keuntungan Mak. 12% 933,018.27

Jumlah + Keuntungan 10,263,200.99

Dibulatkan 10,263,200.00

1 m2 Bekisting balok (2x pakai)

Kayu kelas III m3 0.0200 - -

Paku biasa 5 - 12 cm kg 0.2000 - -

Minyak bekisting ltr 0.1000 - -


Bahan
Balok Kayu sembarang, albasia m3 0.0090 - -

Tripleks tebal 9 mm lbr 0.1750 - -

Kayu dolken dia. 8 cm/4 m btg 1.0000 1,500,000.00 1,500,000.00

Pekerja oh 0.3300 185,674.16 61,272.47

Tenaga Analisa Struktur Arsitektur Page 129


HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

Tukang kayu oh 0.1650 189,845.00 31,324.43


Tenaga
Kepala tukang oh 0.0165 206,315.00 3,404.20

Mandor oh 0.0165 218,291.00 3,601.80

Jumlah 1,599,602.90

Keuntungan Mak. 10% 159,960.29

Jumlah + Keuntungan 1,759,563.19

Dibulatkan 1,759,500.00

13 1 m2 Bekisting balok (1x pakai)

Kayu kelas III m3 0.0400 - -

Paku biasa 5 - 12 cm kg 0.4000 - -

Minyak bekisting ltr 0.2000 - -


Bahan
Balok Kayu sembarang, albasia m3 0.0180 - -

Tripleks tebal 9 mm lbr 0.3500 - -

Kayu dolken dia. 8 cm/4 m btg 2.0000 1,500,000.00 3,000,000.00

Pekerja oh 0.6600 185,674.16 122,544.95

Tukang kayu oh 0.3300 189,845.00 62,648.85


Tenaga
Kepala tukang oh 0.0330 206,315.00 6,808.40

Mandor oh 0.0330 218,291.00 7,203.60

Jumlah 3,199,205.79

Keuntungan Mak. 12% 319,920.58

Jumlah + Keuntungan 3,519,126.37

Dibulatkan 3,519,100.00

14 1 m2 Bekisting plat lantai (1x pakai)

Multiplek 12mm lbr 0.3530 - -

Kaso 5/7 m3 0.1400 - -


Bahan
Paku segala ukuran kg 0.2200 - -

minyak bekisting ltr 0.2000 - -

Pekerja oh 0.2000 185,674.16 37,134.83

Tukang kayu oh 0.1000 189,845.00 18,984.50


Tenaga
Kepala tukang oh 0.0100 206,315.00 2,063.15

Mandor oh 0.0200 218,291.00 4,365.82

Jumlah 62,548.30

Keuntungan Mak. 12% 6,254.83

Jumlah + Keuntungan 68,803.13

Dibulatkan 68,800.00

1 m2 Bekisting plat lantai (2x pakai)

Kayu kelas III m3 0.0200 - -

Paku biasa 5 - 12 cm kg 0.2000 - -

Minyak bekisting ltr 0.1000 - -


Bahan
Balok Kayu sembarang, albasia m3 0.0075 - -

Tripleks tebal 9 mm lbr 0.1750 - -

Kayu dolken dia. 8 cm/4 m btg 3.0000 1,500,000.00 4,500,000.00

Pekerja oh 0.3300 185,674.16 61,272.47

Tukang kayu oh 0.1650 189,845.00 31,324.43


Tenaga
Kepala tukang oh 0.0165 206,315.00 3,404.20

Mandor oh 0.0165 218,291.00 3,601.80

Jumlah 4,599,602.90

Keuntungan Mak. 10% 459,960.29

Jumlah + Keuntungan 5,059,563.19

Analisa Struktur Arsitektur Page 130


HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

Dibulatkan 5,059,500.00

1 1 m2 Bekisting plat lantai (2x pakai)

Multiplek 12mm lbr 0.2030 - -

Kaso 5/7 m3 0.0800 - -


Bahan
Paku segala ukuran kg 0.2200 - -

minyak bekisting ltr 0.2000 - -

Pekerja oh 0.2000 185,674.16 37,134.83

Tukang kayu oh 0.1000 189,845.00 18,984.50


Tenaga
Kepala tukang oh 0.0100 206,315.00 2,063.15

Mandor oh 0.0200 218,291.00 4,365.82

Jumlah 62,548.30

Keuntungan Mak. 12% 6,254.83

Jumlah + Keuntungan 68,803.13

Dibulatkan 68,800.00

1 1 m2 Bekisting plat lantai (3x pakai)

Multiplek 12mm lbr 0.1280 - -

Kaso 5/7 m3 0.0050 - -


Bahan
Paku segala ukuran kg 0.2200 - -

minyak bekisting ltr 0.2000 - -

Pekerja oh 0.2000 185,674.16 37,134.83

Tukang kayu oh 0.1000 189,845.00 18,984.50


Tenaga
Kepala tukang oh 0.0100 206,315.00 2,063.15

Mandor oh 0.0200 218,291.00 4,365.82

Jumlah 62,548.30

Keuntungan Mak. 12% 6,254.83

Jumlah + Keuntungan 68,803.13

Dibulatkan 68,800.00

1 1 m1 Kolom praktis beton bertulang (11x11) cm

Kayu kaso 5/7 m3 0.0020 - -

Paku segala ukuran kg 0.0100 - -

besi beton polos kg 3.0000 - -

Bahan kawat beton kg 0.4500 - -

semen portland kg 4.0000 - -

pasir beton m3 0.0060 - -

kerikil m3 0.0090 - -

Pekerja oh 0.1800 185,674.16 33,421.35

Tukang batu oh 0.0200 189,845.00 3,796.90

Tukang kayu oh 0.0200 - -


Tenaga
Tukang besi oh 0.0200 - -

Kepala tukang oh 0.0060 - -

Mandor oh 0.0090 - -

Jumlah 37,218.25

Keuntungan Mak. 12% 3,721.82

Jumlah + Keuntungan 40,940.07

Dibulatkan 40,900.00

1 1 m1 Ring balok beton bertulang (10x15) cm

Kayu kaso 5/7 m3 0.0030 - -

Paku segala ukuran kg 0.0200 - -

Analisa Struktur Arsitektur Page 131


Bahan
HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

besi beton polos kg 3.6000 - -

Bahan kawat beton kg 0.0500 - -

semen portland kg 5.5000 - -

pasir beton m3 0.0090 - -

kerikil m3 0.0150 - -

Pekerja oh 0.2970 185,674.16 55,145.23

Tukang batu oh 0.0330 189,845.00 6,264.89

Tukang kayu oh 0.0330 - -


Tenaga
Tukang besi oh 0.0330 - -

Kepala tukang oh 0.0100 - -

Mandor oh 0.0150 - -

Jumlah 61,410.11

Keuntungan Mak. 12% 6,141.01

Jumlah + Keuntungan 67,551.12

Dibulatkan 67,500.00

15 1 m2 Bekisting tangga

Kayu kelas III m3 0.0300 - -

Paku biasa 5 - 12 cm kg 0.4000 - -

Minyak bekisting ltr 0.1500 - -


Bahan
Balok Kayu sembarang, albasia m3 0.0150 - -

Tripleks tebal 9 mm lbr 0.3500 - -

Kayu dolken dia. 8 cm/4 m btg 2.0000 1,500,000.00 3,000,000.00

Pekerja oh 0.6600 185,674.16 122,544.95

Tukang kayu oh 0.3300 189,845.00 62,648.85


Tenaga
Kepala tukang oh 0.0330 206,315.00 6,808.40

Mandor oh 0.0330 218,291.00 7,203.60

Jumlah 3,199,205.79

Keuntungan Mak. 12% 319,920.58

Jumlah + Keuntungan 3,519,126.37

Dibulatkan 3,519,100.00

16 1 m2 Bekisting plat lantai dengan bondek + shear connector

Bondek + shear connector m2 1.2000 - -


Bahan
Alat bantu ls 1.0000 - -

Pekerja oh 0.1000 185,674.16 18,567.42

Tukang besi oh 0.0010 189,845.00 189.85


Tenaga
Kepala tukang oh 0.0001 - -

Mandor oh 0.0001 218,291.00 21.83

Jumlah 18,779.09

Keuntungan Mak. 10% 1,877.91

Jumlah + Keuntungan 20,657.00

Dibulatkan 20,600.00

Analisa Struktur Arsitektur Page 132


HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

17 1 bh Chemical Anchor Besi D13 mm, L=700 mm

Besi D13 mm, L=700 mm kg 0.7293 2,781.44 2,028.56

Bahan/Upah Pengeboran ls 1.0000 50,000.00 50,000.00

Chemical/Lem Epoxy 2 komponen kg 0.0650 115,000.00 7,475.00

Jumlah 59,503.56

Keuntungan Mak. 10% 5,950.36

Jumlah + Keuntungan 65,453.91

Dibulatkan 65,400.00

18 1 bh Chemical Anchor Besi D13 mm, L=300 mm

Besi D13 mm, L=300 mm kg 0.3126 2,781.44 869.38

Bahan/Upah Pengeboran ls 1.0000 50,000.00 50,000.00

Chemical/Lem Epoxy 2 komponen kg 0.0650 115,000.00 7,475.00

Jumlah 58,344.38

Keuntungan Mak. 10% 5,834.44

Jumlah + Keuntungan 64,178.82

Dibulatkan 64,100.00

19 1 bh Chemical Anchor Besi D16 mm, L=8500 mm

Besi D16 mm, L=850 mm kg 1.3415 2,781.44 3,731.31

Bahan/Upah Pengeboran ls 1.0000 50,000.00 50,000.00

Chemical/Lem Epoxy 2 komponen kg 0.0750 115,000.00 8,625.00

Jumlah 62,356.31

Keuntungan Mak. 10% 6,235.63

Jumlah + Keuntungan 68,591.94

Dibulatkan 68,500.00

1 1 m2 Pasangan dinding bata merah1/2 bata ad. 1PC : 5Psr

Bata merah bh 70.0000 410.00 28,700.00

Bahan Pasir pasang m3 0.0450 235,000.00 10,575.00

PC kg 9.6800 - -

Pekerja oh 0.3000 185,674.16 55,702.25

Tukang batu oh 0.1000 189,845.00 18,984.50


Tenaga
Kepala tukang oh 0.0100 206,315.00 2,063.15

Mandor oh 0.0150 218,291.00 3,274.37

Jumlah 119,299.26

Keuntungan Mak. 12% 11,929.93

Jumlah + Keuntungan 131,229.19

Dibulatkan 131,200.00

2 1 m2 Pasangan dinding bata ringan/hebel 7 cm

Bata ringan/hebel bh 8.4000 - -


Bahan
Mortar siap pakai kg 0.0630 - -

Pekerja oh 0.6700 185,674.16 124,401.69

Tukang batu oh 0.1300 189,845.00 24,679.85


Tenaga
Kepala tukang oh 0.0130 206,315.00 2,682.10

Mandor oh 0.0130 218,291.00 2,837.78

Jumlah 154,601.42

Keuntungan Mak. 10% 15,460.14

Jumlah + Keuntungan 170,061.56

Analisa Struktur Arsitektur Page 133


HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

Dibulatkan 170,000.00

1 1 m2 Pasangan dinding bata merah bata ad. 1PC : 4Psr

Bata merah bh 140.0000 - -

Bahan Pasir pasang m3 0.0930 - -

PC kg 26.5500 - -

Pekerja oh 0.6000 185,674.16 111,404.50

Tukang batu oh 0.2000 189,845.00 37,969.00


Tenaga
Kepala tukang oh 0.0200 206,315.00 4,126.30

Mandor oh 0.0300 218,291.00 6,548.73

Jumlah 160,048.53

Keuntungan Mak. 12% 16,004.85

Jumlah + Keuntungan 176,053.38

Dibulatkan 176,000.00

2 1 m2 dinding terawang (rooster) 12x11x24 campuran 1SP:4PP

Bata berongga bh 95.0000 - -

Bahan Semen portland kg 11.0000 - -

Pasair Pasang m3 0.0350 - -

Pekerja oh 0.3000 185,674.16 55,702.25

Tukang batu oh 0.1000 189,845.00 18,984.50


Tenaga
Kepala tukang oh 0.0100 206,315.00 2,063.15

Mandor oh 0.0150 218,291.00 3,274.37

Jumlah 80,024.26

Keuntungan Mak. 12% 8,002.43

Jumlah + Keuntungan 88,026.69

Dibulatkan 88,000.00

2 1 m2 Pasangan bataco 40x19x9 cm ad. 1PC:5Psr

Batako isi 12 bh/m² bh 13.0000 - -

Bahan Semen Tiga Roda 50 kg zak 0.0800 - -

Pasir Pasang m3 0.0160 235,000.00 3,760.00

Pekerja oh 0.2900 185,674.16 53,845.51

Tenaga Tukang batu oh 0.1500 189,845.00 28,476.75

Mandor oh 0.0300 218,291.00 6,548.73

Analisa Struktur Arsitektur Page 134


HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

Jumlah 92,630.99

Keuntungan Mak. 12% 9,263.10

Jumlah + Keuntungan 101,894.09

Dibulatkan 101,800.00

1 m2 Pemasangan dinding terawang (rooster) 12x11x24 cm campuran 1SP : 3PP

Bata rooster bh 30.0000 - -

Bahan Semen portland kg 11.0000 - -

Pasir pasang m3 0.0350 235,000.00 8,225.00

Pekerja oh 0.3000 185,674.16 55,702.25

Tukang batu oh 0.1000 189,845.00 18,984.50


Tenaga
Kepala tukang oh 0.0100 206,315.00 2,063.15

Mandor oh 0.0150 218,291.00 3,274.37

Jumlah 88,249.26

Keuntungan Mak. 10% 8,824.93

Jumlah + Keuntungan 97,074.19

Dibulatkan 97,000.00

PENETAPAN INDEKS HARGA SATUAN PEKERJAAN PLESTERAN

1 1 m2 Plesteran ad. 1 pc : 4 pp, tebal 15 mm

Semen portland kg 6.2400 - -


Bahan
Pasir pasang m3 0.0240 - -

Pekerja oh 0.3000 185,674.16 55,702.25

Tukang batu oh 0.1500 189,845.00 28,476.75


Tenaga
Kepala tukang oh 0.0150 206,315.00 3,094.73

Mandor oh 0.0150 218,291.00 3,274.37

Jumlah 90,548.09

Keuntungan Mak. 12% 9,054.81

Jumlah + Keuntungan 99,602.90

Dibulatkan 99,600.00

1 1 m2 Plesteran ad. 1 pc : 5 pp, tebal 15 mm

Semen portland kg 5.1840 - -


Bahan
Pasir pasang m3 0.0260 - -

Pekerja oh 0.3000 185,674.16 55,702.25

Tukang batu oh 0.1500 189,845.00 28,476.75


Tenaga
Kepala tukang oh 0.0150 206,315.00 3,094.73

Mandor oh 0.0150 218,291.00 3,274.37

Jumlah 90,548.09

Keuntungan Mak. 12% 9,054.81

Jumlah + Keuntungan 99,602.90

Dibulatkan 99,600.00

2 1 m2 Plesteran ad. 1 pc : 5 pp, tebal 20 mm

Semen portland kg 6.9120 - -


Bahan
Pasir pasang m3 0.0350 235,000.00 8,225.00

Pekerja oh 0.4000 185,674.16 74,269.66

Tukang batu oh 0.2000 189,845.00 37,969.00


Tenaga
Kepala tukang oh 0.0200 206,315.00 4,126.30

Mandor oh 0.0220 218,291.00 4,802.40

Jumlah 129,392.37

Analisa Struktur Arsitektur Page 135


HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

Keuntungan Mak. 12% 12,939.24

Jumlah + Keuntungan 142,331.60

Dibulatkan 142,300.00

3 1 m2 Acian

Bahan Semen portland kg 3.2500 - -

Pekerja oh 0.2000 185,674.16 37,134.83

Tukang batu oh 0.1000 189,845.00 18,984.50


Tenaga
Kepala tukang oh 0.0100 206,315.00 2,063.15

Mandor oh 0.0100 218,291.00 2,182.91

Jumlah 60,365.39

Keuntungan Mak. 12% 6,036.54

Jumlah + Keuntungan 66,401.93

Dibulatkan 66,400.00

4 1 m2 Acian beton ekspos dengan semen mortar MU-200

Bahan Semen portland kg 3.2500 - -

Pekerja oh 0.2000 185,674.16 37,134.83

Tukang batu oh 0.1000 189,845.00 18,984.50


Tenaga
Kepala tukang oh 0.0100 206,315.00 2,063.15

Mandor oh 0.0100 218,291.00 2,182.91

Jumlah 60,365.39

Keuntungan Mak. 12% 6,036.54

Jumlah + Keuntungan 66,401.93

Dibulatkan 66,400.00

PENETAPAN INDEKS HARGA SATUAN PEKERJAAN DINDING PARTISI

1 1 m2 Pasangan rangka dinding partisi, metal stud + u runner

Metal stud uk. 34x76 mm tbl. 0,40 mm m1 1.1000 - -

Bahan U runner uk. 25x76 mm tbl. 0,35 mm m1 1.1000 - -

Alat bantu termasuk sekrup, dll ls 1.0000 - -

Pekerja oh 0.1500 185,674.16 27,851.12

Tukang kayu oh 0.4500 189,845.00 85,430.25


Tenaga
Kepala tukang oh 0.0500 206,315.00 10,315.75

Mandor oh 0.0100 218,291.00 2,182.91

Jumlah 125,780.03

Keuntungan Mak. 12% 12,578.00

Jumlah + Keuntungan 138,358.04

Dibulatkan 138,300.00

2 1 m2 Pasangan penutup dinding partisi gypsum tbl.12 mm

Gypsum board tbl. 12 mm lbr 0.3470 124,000.00 43,028.00

Bahan Gypsum tape rol 0.0533 - -

Paku sekrup kg 0.0100 - -

Pekerja oh 0.0300 185,674.16 5,570.22

Tukang kayu oh 0.0700 189,845.00 13,289.15


Tenaga
Kepala tukang oh 0.0070 206,315.00 1,444.21

Mandor oh 0.0015 218,291.00 327.44

Jumlah 63,659.02

Keuntungan Mak. 12% 6,365.90

Analisa Struktur Arsitektur Page 136


HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

Jumlah + Keuntungan 70,024.92

Dibulatkan 70,000.00

3 1 m2 Pasangan penutup dinding partisi multipleks tbl.9 mm

Multipleks tbl. 9 mm lbr 0.3470 - -


Bahan
Paku sekrup kg 0.0100 - -

Pekerja oh 0.0300 185,674.16 5,570.22

Tukang kayu oh 0.0700 189,845.00 13,289.15


Tenaga
Kepala tukang oh 0.0070 206,315.00 1,444.21

Mandor oh 0.0015 218,291.00 327.44

Jumlah 20,631.02

Keuntungan Mak. 12% 2,063.10

Jumlah + Keuntungan 22,694.12

Dibulatkan 22,600.00

4 1 m2 Pasangan HPL

HPL lbr 0.3470 - -


Bahan
Lem Kuning kg 0.2000 28,000.00 5,600.00

Pekerja oh 0.0300 185,674.16 5,570.22

Tukang kayu oh 0.0700 189,845.00 13,289.15


Tenaga
Kepala tukang oh 0.0070 206,315.00 1,444.21

Mandor oh 0.0015 218,291.00 327.44

Jumlah 26,231.02

Keuntungan Mak. 12% 2,623.10

Jumlah + Keuntungan 28,854.12

Dibulatkan 28,800.00

5 1 m2 Pasangan HPL + List SS

HPL lbr 0.3470 - -

Bahan List SS 2 cm m2 0.0300 - -

Lem Kuning kg 0.2000 28,000.00 5,600.00

Pekerja oh 0.0400 185,674.16 7,426.97

Tukang kayu oh 0.0800 189,845.00 15,187.60


Tenaga
Kepala tukang oh 0.0080 206,315.00 1,650.52

Mandor oh 0.0020 218,291.00 436.58

Jumlah 30,301.67

Keuntungan Mak. 12% 3,030.17

Jumlah + Keuntungan 33,331.84

Dibulatkan 33,300.00

1 m2 Pasangan rockwoll t=5 cm density 40 kg/m3

Bahan Rockwoll t=5 cm density 40 kg/m3 m2 1.3800 6,500.00 8,970.00

Pekerja oh 0.0250 185,674.16 4,641.85


Tenaga
Tukang kayu oh 0.2500 189,845.00 47,461.25

Jumlah 61,073.10

Keuntungan Mak. 10% 6,107.31

Jumlah + Keuntungan 67,180.41

Dibulatkan 67,100.00

6 1 m2 Pekerjaan Aluminium Composite Panel (ACP)

Aluminium composite panel m2 1.1500 - -

Braket galvanis ACP bh 2.0000 25,000.00 50,000.00

Bahan
Analisa Struktur Arsitektur Page 137
HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

Bahan Rangka Aluminium composite ( 40 x 40 mm ) m1 4.5000 55,000.00 247,500.00

Sekrup aluminium kg 0.4000 16,300.00 6,520.00

Sealent tube 1.5000 - -

Pekerja oh 0.3500 185,674.16 64,985.96

Tukang kayu oh 0.4500 189,845.00 85,430.25


Tenaga
Kepala tukang oh 0.1500 206,315.00 30,947.25

Mandor oh 0.1200 218,291.00 26,194.92

Jumlah 511,578.38

Keuntungan Mak. 12% 51,157.84

Jumlah + Keuntungan 562,736.21

Dibulatkan 562,700.00

PENETAPAN INDEKS HARGA SATUAN PEKERJAAN PINTU/JENDELA & KACA

1 1 kg Pasangan kusen besi hollow

Besi hollow 50x100 t2,0 kg 1.6985 20,208.78 34,324.88

Bahan Cat besi hollw m2 1.2000 - -

Pengelasan (5%) dari material 0.0500 34,324.88 1,716.24

Pekerja oh 0.0430 185,674.16 7,983.99

Tukang besi oh 0.0430 189,845.00 8,163.33


Tenaga
Kepala tukang oh 0.0043 - -

Mandor oh 0.0021 218,291.00 458.41

Jumlah 52,646.86

Keuntungan Mak. 12% 5,264.69

Jumlah + Keuntungan 57,911.55

Dibulatkan 57,900.00

2 1 kg Pasangan jalusi besi hollow

Besi hollow 20x40 t1,8 kg 3.8348 16,676.50 63,951.18

Bahan Cat besi hollw m2 1.2000 - -

Pengelasan (5%) dari material ls 0.0500 63,951.18 3,197.56

Pekerja oh 0.0430 185,674.16 7,983.99

Tukang besi oh 0.0430 189,845.00 8,163.33


Tenaga
Kepala tukang oh 0.0043 - -

Mandor oh 0.0021 218,291.00 458.41

Jumlah 83,754.47

Keuntungan Mak. 12% 8,375.45

Jumlah + Keuntungan 92,129.92

Dibulatkan 92,100.00

3 1 m1 Pasangan jalusi besi hollow 4x3 aluminium

Besi hollow 4 x 3 m1 1.1000 - -


Bahan
Scrup bh 2.0000 - -

Sealant tube 0.0600 - -

Pekerja oh 0.0430 185,674.16 7,983.99

Tukang khusus alluminium oh 0.0430 189,845.00 8,163.33


Tenaga
Kepala tukang oh 0.0043 - -

Mandor oh 0.0021 218,291.00 458.41

Jumlah 16,605.73

Keuntungan Mak. 12% 1,660.57

Jumlah + Keuntungan 18,266.31

Analisa Struktur Arsitektur Page 138


HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

Dibulatkan 18,200.00

3 1 m2 Pembuatan dan pemasangan pintu panel , kayu kelas1

Papan kayu samarind oven m3 0.0400 - -


Bahan
Lem kayu kg 0.5000 - -

Pekerja oh 1.0000 185,674.16 185,674.16

Tukang kayu oh 3.0000 189,845.00 569,535.00


Tenaga
Kepala tukang oh 0.3000 - -

Mandor oh 0.0500 218,291.00 10,914.55

Jumlah 766,123.71

Keuntungan Mak. 12% 76,612.37

Jumlah + Keuntungan 842,736.08

Dibulatkan 842,700.00

3 1 m2 Pembuatan dan Pemasangan frame daun pintu aluminium CA

Profil Alluminium 4" m1 1.1000 - -

Bahan Skrup fixer bh 2.0000 300.00 600.00

Sealant tube 0.0600 - -

Pekerja oh 0.0430 185,674.16 7,983.99

Tukang khusus aluminium oh 0.0430 189,845.00 8,163.33


Tenaga
Kepala tukang oh 0.0043 - -

Mandor oh 0.0021 218,291.00 458.41

Jumlah 17,205.73

Keuntungan Mak. 12% 1,720.57

Jumlah + Keuntungan 18,926.31

Dibulatkan 18,900.00

4 1 m2 Pembuatan dan Pemasangan Pintu Lipat / Sketsel

Bahan Pintu kayu meranti m2 1.6000 - -

Pekerja oh 0.4400 185,674.16 81,696.63

Tukang khusus aluminium oh 0.4400 189,845.00 83,531.80


Tenaga
Kepala tukang oh 0.0400 - -

Mandor oh 0.2200 218,291.00 48,024.02

Jumlah 213,252.45

Keuntungan Mak. 12% 21,325.25

Jumlah + Keuntungan 234,577.70

Dibulatkan 234,500.00

1 1 m2 Pembuatan pintu besi baja plat t=2 mm rangkap, rangka baja siku

Besi siku L 30.30.3 kg 15.0000 - -

Bahan Besi pelat baja kg 32.8000 124,000.00 4,067,200.00

Kawat las kg 0.0500 17,500.00 875.00

Pekerja oh 1.0500 185,674.16 194,957.87

Tukang kayu oh 1.0500 189,845.00 199,337.25


Tenaga
Kepala tukang oh 0.1050 206,315.00 21,663.08

Mandor oh 0.0525 218,291.00 11,460.28

Jumlah 4,495,493.47

Keuntungan Mak. 12% 449,549.35

Jumlah + Keuntungan 4,945,042.82

Dibulatkan 4,945,000.00

1 m2 Pasangan pintu panel kayu kamper samarinda oven

Analisa Struktur Arsitektur Page 139


HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

Bahan Kayu kamper samarinda, papan (oven) m3 0.0400 - -

Pekerja oh 1.0000 185,674.16 185,674.16

Tukang kayu oh 2.5000 189,845.00 474,612.50


Tenaga
Kepala tukang oh 0.2500 206,315.00 51,578.75

Mandor oh 0.0500 218,291.00 10,914.55

Jumlah 722,779.96

Keuntungan Mak. 10% 72,278.00

Jumlah + Keuntungan 795,057.96

Dibulatkan 795,000.00

2 1 m2 Pasangan pintu double multiplek

Bahan Daun Pintu Multiplek 2 Muka Tebal 9 mm m2 2.1000 - -

Pekerja oh 1.0000 185,674.16 185,674.16

Tukang kayu oh 2.5000 189,845.00 474,612.50


Tenaga
Kepala tukang oh 0.2500 206,315.00 51,578.75

Mandor oh 0.0500 218,291.00 10,914.55

Jumlah 722,779.96

Keuntungan Mak. 12% 72,278.00

Jumlah + Keuntungan 795,057.96

Dibulatkan 795,000.00

3 1 m2 Pasangan kaca polos, tebal 5 mm

Bahan Kaca polos, tebal 5 mm m2 1.1000 - -

Sealant tube 0.2500 - -

Pekerja oh 0.0165 185,674.16 3,063.62

Tukang kayu oh 0.1650 189,845.00 31,324.43


Tenaga
Kepala tukang oh 0.0165 206,315.00 3,404.20

Mandor oh 0.0008 218,291.00 174.63

Jumlah 37,966.88

Keuntungan Mak. 12% 3,796.69

Jumlah + Keuntungan 41,763.57

Dibulatkan 41,700.00

1 m2 Pasangan kaca polos, tebal 8 mm

Bahan Kaca polos, tebal 8 mm m2 1.1000 - -

Sealant tube 0.2500 - -

Pekerja oh 0.0165 185,674.16 3,063.62

Tukang kayu oh 0.1650 189,845.00 31,324.43


Tenaga
Kepala tukang oh 0.0165 206,315.00 3,404.20

Mandor oh 0.0008 218,291.00 174.63

Jumlah 37,966.88

Keuntungan Mak. 10% 3,796.69

Jumlah + Keuntungan 41,763.57

Dibulatkan 41,700.00

4 1 m2 Pasangan kaca laminated polos, tebal 8 mm (4+0,38+4)

Bahan Kaca laminated polos, tebal 8 mm (4+0,38+4) m2 1.1000 - -

Sealant tube 0.2500 - -

Pekerja oh 0.0165 185,674.16 3,063.62

Tukang kayu oh 0.1650 189,845.00 31,324.43


Tenaga
Kepala tukang oh 0.0165 206,315.00 3,404.20

Mandor oh 0.0008 218,291.00 174.63

Analisa Struktur Arsitektur Page 140


HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

Jumlah 37,966.88

Keuntungan Mak. 12% 3,796.69

Jumlah + Keuntungan 41,763.57

Dibulatkan 41,700.00

5 1 m2 Pasangan kaca tempered polos, tebal 10 mm

Bahan Kaca tempered polos, tebal 10 mm m2 1.1000 - -

Sealant tube 0.2500 - -

Pekerja oh 0.0165 185,674.16 3,063.62

Tukang kayu oh 0.1650 189,845.00 31,324.43


Tenaga
Kepala tukang oh 0.0165 206,315.00 3,404.20

Mandor oh 0.0008 218,291.00 174.63

Jumlah 37,966.88

Keuntungan Mak. 12% 3,796.69

Jumlah + Keuntungan 41,763.57

Dibulatkan 41,700.00

6 1 m2 Pasangan kaca tempered polos, tebal 12 mm

Bahan Kaca tempered polos, tebal 10 mm m2 1.1000 - -

Sealant tube 0.2500 - -

Pekerja oh 0.0165 185,674.16 3,063.62

Tukang kayu oh 0.1650 189,845.00 31,324.43


Tenaga
Kepala tukang oh 0.0165 206,315.00 3,404.20

Mandor oh 0.0008 218,291.00 174.63

Jumlah 37,966.88

Keuntungan Mak. 12% 3,796.69

Jumlah + Keuntungan 41,763.57

Dibulatkan 41,700.00

7 1 m2 Pasangan stiker sandblast kaca

Bahan Stiker sandblast m2 1.0500 10,000.00 10,500.00

Pekerja oh 0.0150 185,674.16 2,785.11

Tukang kayu oh 0.1500 189,845.00 28,476.75


Tenaga
Kepala tukang oh 0.0150 206,315.00 3,094.73

Mandor oh 0.0008 218,291.00 163.72

Jumlah 45,020.31

Keuntungan Mak. 10% 4,502.03

Jumlah + Keuntungan 49,522.34

Dibulatkan 49,500.00

PENETAPAN INDEKS HARGA SATUAN PEKERJAAN KUNCI DAN PENGGANTUNG

1 1 set pasangan Engsel Pintu 4" SS Bearing Wall

Bahan Engsel pintu stainless 4" set 1.0000 - -

Pekerja oh 0.0150 185,674.16 2,785.11

Tukang kayu oh 0.1500 189,845.00 28,476.75


Tenaga
Kepala tukang oh 0.0150 206,315.00 3,094.73

Mandor oh 0.0008 218,291.00 163.72

Jumlah 34,520.31

Keuntungan Mak. 12% 3,452.03

Jumlah + Keuntungan 37,972.34

Analisa Struktur Arsitektur Page 141


HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

Dibulatkan 37,900.00

2 1 set pasangan Engsel Jendela 16"

Bahan Engsel jendela dekson set 1.0000 - -

Pekerja oh 0.0150 185,674.16 2,785.11

Tukang kayu oh 0.1500 189,845.00 28,476.75


Tenaga
Kepala tukang oh 0.0150 206,315.00 3,094.73

Mandor oh 0.0008 218,291.00 163.72

Jumlah 34,520.31

Keuntungan Mak. 12% 3,452.03

Jumlah + Keuntungan 37,972.34

Dibulatkan 37,900.00

2 1 bh pasang Rambuncis

Bahan Rumbuncis bh 1.0000 - -

Pekerja oh 0.0100 185,674.16 1,856.74

Tukang kayu oh 0.1000 189,845.00 18,984.50


Tenaga
Kepala tukang oh 0.0100 206,315.00 2,063.15

Mandor oh 0.0005 218,291.00 109.15

Jumlah 23,013.54

Keuntungan Mak. 12% 2,301.35

Jumlah + Keuntungan 25,314.89

Dibulatkan 25,300.00

3 1 set pasang Friction Stay 8"

Bahan Friction stay 8" bh 1.0000 - -

Pekerja oh 0.0150 185,674.16 2,785.11

Tukang kayu oh 0.1500 189,845.00 28,476.75


Tenaga
Kepala tukang oh 0.0150 206,315.00 3,094.73

Mandor oh 0.0008 218,291.00 174.63

Jumlah 34,531.22

Keuntungan Mak. 12% 3,453.12

Jumlah + Keuntungan 37,984.34

Dibulatkan 37,900.00

4 1 set pasang Kunci Pintu (Lockcase + Cylinder)

Bahan Kunci pintu SS (Lockcase + Cylinder) bh 1.0000 - -

Pekerja oh 0.0100 185,674.16 1,856.74

Tukang kayu oh 0.5000 189,845.00 94,922.50


Tenaga
Kepala tukang oh 0.0500 206,315.00 10,315.75

Mandor oh 0.0050 218,291.00 1,091.46

Jumlah 108,186.45

Keuntungan Mak. 12% 10,818.64

Jumlah + Keuntungan 119,005.09

Dibulatkan 119,000.00

5 1 set pasang Door Closer Dekkson 40 kg

Bahan Door closer Dekkson 40 kg set 1.0000 - -

Pekerja oh 0.0500 185,674.16 9,283.71

Tukang kayu oh 0.5000 189,845.00 94,922.50


Tenaga
Kepala tukang oh 0.0500 206,315.00 10,315.75

Mandor oh 0.0030 218,291.00 654.87

Analisa Struktur Arsitektur Page 142


HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

Jumlah 115,176.83

Keuntungan Mak. 12% 11,517.68

Jumlah + Keuntungan 126,694.51

Dibulatkan 126,600.00

6 1 set pasang Door Handle stainless steel type HRE

Bahan Door handle stainless steel HRE psg 1.0000 - -

Pekerja oh 0.0150 185,674.16 2,785.11

Tukang kayu oh 0.1500 189,845.00 28,476.75


Tenaga
Kepala tukang oh 0.0150 206,315.00 3,094.73

Mandor oh 0.0008 218,291.00 174.63

Jumlah 34,531.22

Keuntungan Mak. 12% 3,453.12

Jumlah + Keuntungan 37,984.34

Dibulatkan 37,900.00

7 1 set pasang Pull Handle SS Hairline H.30.30. L=1200 mm

Bahan Pull Handle SS H.30.30 L1200 mm psg 1.0000 10,000.00 10,000.00

Pekerja oh 0.0150 185,674.16 2,785.11

Tukang kayu oh 0.1500 189,845.00 28,476.75


Tenaga
Kepala tukang oh 0.0150 206,315.00 3,094.73

Mandor oh 0.0008 218,291.00 174.63

Jumlah 44,531.22

Keuntungan Mak. 12% 4,453.12

Jumlah + Keuntungan 48,984.34

Dibulatkan 48,900.00

8 1 set pasang Pull Handle SS Bulat C.300.D.32

Bahan Pull Handle SS Bulat C.300.D.32 psg 1.0000 - -

Pekerja oh 0.0150 185,674.16 2,785.11

Tukang kayu oh 0.1500 189,845.00 28,476.75


Tenaga
Kepala tukang oh 0.0150 206,315.00 3,094.73

Mandor oh 0.0008 218,291.00 174.63

Jumlah 34,531.22

Keuntungan Mak. 12% 3,453.12

Jumlah + Keuntungan 37,984.34

Dibulatkan 37,900.00

9 1 set pasangan Flush Bolt

Bahan Flush bolt set 1.0000 - -

Pekerja oh 0.0500 185,674.16 9,283.71

Tukang kayu oh 0.5000 189,845.00 94,922.50


Tenaga
Kepala tukang oh 0.0500 206,315.00 10,315.75

Mandor oh 0.0030 218,291.00 654.87

Jumlah 115,176.83

Keuntungan Mak. 12% 11,517.68

Jumlah + Keuntungan 126,694.51

Dibulatkan 126,600.00

10 1 bh Pasangan floor hinges

Bahan Floor hinges BTS 84/EN3/PSS, Dorma bh 1.0000 - -

Pekerja oh 0.0150 185,674.16 2,785.11

Tenaga Analisa Struktur Arsitektur Page 143


HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

Tukang kayu oh 0.1500 189,845.00 28,476.75


Tenaga
Kepala tukang oh 0.0150 206,315.00 3,094.73

Mandor oh 0.0008 218,291.00 163.72

Jumlah 34,520.31

Keuntungan Mak. 12% 3,452.03

Jumlah + Keuntungan 37,972.34

Dibulatkan 37,900.00

11 1 bh Pasangan bottom pivot patch

Bahan Bottom pivot patch PT 10/PSS, Dorma bh 1.0000 175,000.00 175,000.00

Pekerja oh 0.0150 185,674.16 2,785.11

Tukang kayu oh 0.1500 189,845.00 28,476.75


Tenaga
Kepala tukang oh 0.0150 206,315.00 3,094.73

Mandor oh 0.0008 218,291.00 163.72

Jumlah 209,520.31

Keuntungan Mak. 12% 20,952.03

Jumlah + Keuntungan 230,472.34

Dibulatkan 230,400.00

12 1 bh Pasangan top pivot patch

Bahan Top pivot patch PT 20/PSS, Dorma bh 1.0000 - -

Pekerja oh 0.0150 185,674.16 2,785.11

Tukang kayu oh 0.1500 189,845.00 28,476.75


Tenaga
Kepala tukang oh 0.0150 206,315.00 3,094.73

Mandor oh 0.0008 218,291.00 163.72

Jumlah 34,520.31

Keuntungan Mak. 12% 3,452.03

Jumlah + Keuntungan 37,972.34

Dibulatkan 37,900.00

13 1 bh Pasangan top pin

Bahan Top pin PT 24-Silver, Dorma bh 1.0000 88,950.00 88,950.00

Pekerja oh 0.0150 185,674.16 2,785.11

Tukang kayu oh 0.1500 189,845.00 28,476.75


Tenaga
Kepala tukang oh 0.0150 206,315.00 3,094.73

Mandor oh 0.0008 218,291.00 174.63

Jumlah 123,481.22

Keuntungan Mak. 12% 12,348.12

Jumlah + Keuntungan 135,829.34

Dibulatkan 135,800.00

14 1 bh Pasangan grendel

Bahan Grendel bh 1.0000 - -

Pekerja oh 0.0200 185,674.16 3,713.48

Tukang kayu oh 0.2000 189,845.00 37,969.00


Tenaga
Kepala tukang oh 0.0200 206,315.00 4,126.30

Mandor oh 0.0010 218,291.00 218.29

Jumlah 46,027.07

Keuntungan Mak. 12% 4,602.71

Jumlah + Keuntungan 50,629.78

Dibulatkan 50,600.00

Analisa Struktur Arsitektur Page 144


HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

15 1 m3 pembuatan Kusen Pintu/Jendela Kayu Kelas I

Balok kayu kelas I m3 1.1000 15,313,000.00 16,844,300.00

Bahan Paku 10 cm kg 1.2500 - -

Lem kayu kg 1.0000 - -

Pekerja oh 0.8500 185,674.16 157,823.04

Tukang kayu oh 2.5500 189,845.00 484,104.75


Tenaga
Kepala tukang oh 0.2550 206,315.00 52,610.33

Mandor oh 0.0425 218,291.00 9,277.37

Jumlah 17,548,115.48

Keuntungan Mak. 12% 1,754,811.55

Jumlah + Keuntungan 19,302,927.03

Dibulatkan 19,302,900.00

16 1 m2 daun pintu double tripleks rangka kayu finished HPL

Papan kayu kelas III m3 0.0250 - -

Paku 1 - 2,5 cm kg 0.0300 - -

Bahan Lem kuning kg 0.8000 28,000.00 22,400.00

Tripleks 6 mm lbr 1.0000 - -

HPL m2 1.0000 - -

Pekerja oh 0.8500 185,674.16 157,823.04

Tukang kayu oh 2.5500 189,845.00 484,104.75


Tenaga
Kepala tukang oh 0.2550 206,315.00 52,610.33

Mandor oh 0.0425 218,291.00 9,277.37

Jumlah 726,215.48

Keuntungan Mak. 12% 72,621.55

Jumlah + Keuntungan 798,837.03

Dibulatkan 798,800.00

PENETAPAN INDEKS HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN DINDING

1 1 m2 Pasangan lantai homogeneous tile 60x60 cm, polished

Homogeneous tile 60 x 60 cm, polished bh 3.1000 - -

Semen portland kg 9.6000 - -


Bahan
Pasir pasang m3 0.0450 - -

Semen warna kg 1.5000 - -

Pekerja oh 0.2400 - -

Tukang batu oh 0.1200 - -


Tenaga
Kepala tukang oh 0.0120 - -

Mandor oh 0.0120 - -

Jumlah -

Keuntungan Mak. 12% -

Jumlah + Keuntungan -

Dibulatkan -

2 1 m2 Pasangan lantai HT 40x40 cm, unpolished

Homogeneous tile 40 x 40 cm, unpolished bh 6.6300 24,960.00 165,484.80

Semen portland kg 9.8000 - -


Bahan
Pasir pasang m3 0.0450 235,000.00 10,575.00

Semen warna kg 1.3000 1,420.00 1,846.00

Pekerja oh 0.2500 185,674.16 46,418.54

Tukang batu oh 0.1250 189,845.00 23,730.63


Tenaga
Kepala tukang oh 0.0125 206,315.00 2,578.94

Analisa Struktur Arsitektur Page 145


HARGA SATUAN JUMLAH HARGA
NO Tenaga JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

Mandor oh 0.0125 218,291.00 2,728.64

Jumlah 253,362.54

Keuntungan Mak. 12% 25,336.25

Jumlah + Keuntungan 278,698.79

Dibulatkan 278,600.00

3 1 m2 Pasangan lantai keramik 40x40 cm, polished

Keramik 40 x 40 cm, polished bh 6.6300 16,576.00 109,898.88

Semen portland kg 9.8000 - -


Bahan
Pasir pasang m3 0.0450 235,000.00 10,575.00

Semen warna kg 1.3000 1,420.00 1,846.00

Pekerja oh 0.2500 185,674.16 46,418.54

Tukang batu oh 0.1250 189,845.00 23,730.63


Tenaga
Kepala tukang oh 0.0125 206,315.00 2,578.94

Mandor oh 0.0125 218,291.00 2,728.64

Jumlah 197,776.62

Keuntungan Mak. 12% 19,777.66

Jumlah + Keuntungan 217,554.28

Dibulatkan 217,500.00

4 1 m2 Pasangan lantai keramik 30x30 cm Unpolish

Keramik 30 x 30 cm UnPolish bh 11.8700 - -

Semen portland kg 10.0000 - -

Pasir pasang m3 0.0450 - -

Semen warna kg 1.5000 - -

Pekerja oh 0.2600 - -

Tukang batu oh 0.1300 - -


Tenaga
Kepala tukang oh 0.0130 - -

Mandor oh 0.0130 - -

Jumlah -

Keuntungan Mak. 12% -

Jumlah + Keuntungan -

Dibulatkan -

1 1 m2 Pasangan dinding keramik 30x60 cm Polish

Dinding Keramik 30 x 60 cm polish bh 5.6000 - -

Semen portland kg 10.0000 - -

Pasir pasang m3 0.0450 - -

Semen warna kg 1.5000 - -

Pekerja oh 0.2600 - -

Tukang batu oh 0.1300 - -


Tenaga
Kepala tukang oh 0.0130 - -

Mandor oh 0.0130 - -

Jumlah -

Keuntungan Mak. 12% -

Jumlah + Keuntungan -

Dibulatkan -

5 1 m2 Pasangan lantai keramik 20x20 cm

Keramik 20 x 20 cm bh 11.8700 - -

Semen portland kg 14.1500 - -


Bahan
Pasir pasang m3 0.0390 235,000.00 9,165.00

Analisa Struktur Arsitektur Page 146


HARGA SATUAN JUMLAH HARGA
NO Bahan JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

Semen warna kg 2.0000 1,420.00 2,840.00

Pekerja oh 0.1875 185,674.16 34,813.91

Tukang batu oh 0.3750 189,845.00 71,191.88


Tenaga
Kepala tukang oh 0.0750 206,315.00 15,473.63

Mandor oh 0.0188 218,291.00 4,103.87

Jumlah 137,588.28

Keuntungan Mak. 12% 13,758.83

Jumlah + Keuntungan 151,347.10

Dibulatkan 151,300.00

6 1 m2 Pasangan dinding HT 60 x 60 cm, polished

Homogeneous tile 40 x 40 cm, polished m2 1.0500 144,700.00 151,935.00

Semen portland kg 7.1000 - -


Bahan
Pasir pasang m3 0.0230 235,000.00 5,405.00

Semen warna kg 0.5200 1,420.00 738.40

Pekerja oh 0.2400 185,674.16 44,561.80

Tukang batu oh 0.1200 189,845.00 22,781.40


Tenaga
Kepala tukang oh 0.0120 206,315.00 2,475.78

Mandor oh 0.0120 218,291.00 2,619.49

Jumlah 230,516.87

Keuntungan Mak. 12% 23,051.69

Jumlah + Keuntungan 253,568.56

Dibulatkan 253,500.00

7 1 m2 Pasangan dinding HT 40 x 40 cm, polished

Homogeneous tile 40 x 40 cm, polished m2 1.0500 - -

Semen portland kg 7.1000 - -


Bahan
Pasir pasang m3 0.0230 235,000.00 5,405.00

Semen warna kg 0.5200 1,420.00 738.40

Pekerja oh 0.2400 185,674.16 44,561.80

Tukang batu oh 0.1200 189,845.00 22,781.40


Tenaga
Kepala tukang oh 0.0120 206,315.00 2,475.78

Mandor oh 0.0120 218,291.00 2,619.49

Jumlah 78,581.87

Keuntungan Mak. 12% 7,858.19

Jumlah + Keuntungan 86,440.06

Dibulatkan 86,400.00

8 1 m2 Pasangan dinding Keramik 30 x 30 cm

Keramik 30 x 30 cm m2 1.0500 - -

Semen portland kg 7.1000 - -


Bahan
Pasir pasang m3 0.0230 235,000.00 5,405.00

Semen warna kg 0.5200 1,420.00 738.40

Pekerja oh 0.4800 185,674.16 89,123.60

Tukang batu oh 0.2400 189,845.00 45,562.80


Tenaga
Kepala tukang oh 0.0240 206,315.00 4,951.56

Mandor oh 0.0240 218,291.00 5,238.98

Jumlah 151,020.34

Keuntungan Mak. 12% 15,102.03

Jumlah + Keuntungan 166,122.37

Dibulatkan 166,100.00

Analisa Struktur Arsitektur Page 147


HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

9 1 m2 Pasangan dinding Keramik 20 x 20 cm

Keramik 20 x 20 cm m2 1.0500 - -

Semen portland 50 kg kg 7.1000 - -


Bahan
Pasir pasang m3 0.0230 235,000.00 5,405.00

Semen warna 40 kg kg 0.5200 1,420.00 738.40

Pekerja oh 0.4800 185,674.16 89,123.60

Tukang batu oh 0.2400 189,845.00 45,562.80


Tenaga
Kepala tukang oh 0.0240 206,315.00 4,951.56

Mandor oh 0.0240 218,291.00 5,238.98

Jumlah 151,020.34

Keuntungan Mak. 12% 15,102.03

Jumlah + Keuntungan 166,122.37

Dibulatkan 166,100.00

10 1 m1 Pasangan plint HT 10 x 60 cm, polished

Plint homogeneous tile 10 x 60 cm, polished bh 1.6667 - -

Semen portland kg 1.1400 - -


Bahan
Pasir pasang m3 0.0030 235,000.00 705.00

Semen warna kg 0.1000 1,420.00 142.00

Pekerja oh 0.0900 185,674.16 16,710.67

Tukang batu oh 0.0900 189,845.00 17,086.05


Tenaga
Kepala tukang oh 0.0090 206,315.00 1,856.83

Mandor oh 0.0050 218,291.00 1,091.46

Jumlah 37,592.01

Keuntungan Mak. 12% 3,759.20

Jumlah + Keuntungan 41,351.22

Dibulatkan 41,300.00

11 1 m1 Pasangan plint keramik 10 x 30 cm

Plint keramik 10 x 30 cm bh 1.6667 - -

Semen portland kg 1.1400 - -


Bahan
Pasir pasang m3 0.0030 235,000.00 705.00

Semen warna kg 0.1000 1,420.00 142.00

Pekerja oh 0.0900 185,674.16 16,710.67

Tukang batu oh 0.0900 189,845.00 17,086.05


Tenaga
Kepala tukang oh 0.0090 206,315.00 1,856.83

Mandor oh 0.0050 218,291.00 1,091.46

Jumlah 37,592.01

Keuntungan Mak. 12% 3,759.20

Jumlah + Keuntungan 41,351.22

Dibulatkan 41,300.00

12 1 m1 Pasangan step nosing 10 x 30 cm (Permen tidak ada) jadi kita pakai 10x60

Step nosing homogeneous tile 10 x 60 cm bh 1.7000 - -

Semen portland kg 1.1400 - -


Bahan
Pasir pasang m3 0.0030 - -

Semen warna kg 0.1000 - -

Pekerja oh 0.0900 185,674.16 16,710.67

Tukang batu oh 0.0900 189,845.00 17,086.05


Tenaga
Kepala tukang oh 0.0090 206,315.00 1,856.83

Mandor oh 0.0050 218,291.00 1,091.46

Jumlah 36,745.01

Analisa Struktur Arsitektur Page 148


HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

Keuntungan Mak. 12% 3,674.50

Jumlah + Keuntungan 40,419.52

Dibulatkan 40,400.00

13 1 m2 Pasangan Finishing HT Hitam 60 x 60 cm, polished

Homogeneous tile hitam 60 x 60 cm, polished m2 1.0500 - -

Semen portland kg 9.3000 - -


Bahan
Pasir pasang m3 0.0215 235,000.00 5,052.50

Semen warna kg 0.8500 1,420.00 1,207.00

Pekerja oh 0.2400 185,674.16 44,561.80

Tukang batu oh 0.1250 189,845.00 23,730.63


Tenaga
Kepala tukang oh 0.0125 206,315.00 2,578.94

Mandor oh 0.0130 218,291.00 2,837.78

Jumlah 79,968.64

Keuntungan Mak. 12% 7,996.86

Jumlah + Keuntungan 87,965.51

Dibulatkan 87,900.00

14 1 m2 Pasangan dinding batu alam candi hitam

Batu alam candi hitam m2 1.1000 - -

Bahan Semen portland kg 11.7500 - -

Pasir pasang m3 0.0350 235,000.00 8,225.00

Pekerja oh 0.7000 185,674.16 129,971.91

Tukang batu oh 0.3500 189,845.00 66,445.75


Tenaga
Kepala tukang oh 0.0350 206,315.00 7,221.03

Mandor oh 0.0350 218,291.00 7,640.19

Jumlah 219,503.87

Keuntungan Mak. 12% 21,950.39

Jumlah + Keuntungan 241,454.26

Dibulatkan 241,400.00

15 1 m2 Pasang Wall Paper

Wallpaper m2 1.2000 - -
Bahan
Lem kuning kg 0.2000 28,000.00 5,600.00

Pekerja oh 0.0200 185,674.16 3,713.48

Tukang oh 0.2000 189,845.00 37,969.00


Tenaga
Kepala tukang oh 0.0020 206,315.00 412.63

Mandor oh 0.0025 218,291.00 545.73

Jumlah 48,240.84

Keuntungan Mak. 12% 4,824.08

Jumlah + Keuntungan 53,064.92

Dibulatkan 53,000.00

16 1 m2 Waterproofing coating, sika top seal 2x laburan

Bahan Sika top seal A+B kg 1.5000 3,970.00 5,955.00

Pekerja oh 0.0300 185,674.16 5,570.22

Tukang cat oh 0.0900 189,845.00 17,086.05


Tenaga
Kepala tukang oh 0.0090 206,315.00 1,856.83

Mandor oh 0.0015 218,291.00 327.44

Jumlah 30,795.55

Keuntungan Mak. 12% 3,079.55

Jumlah + Keuntungan 33,875.10

Analisa Struktur Arsitektur Page 149


HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

Dibulatkan 33,800.00

1 m2 Screeding ad. 1 pc : 1 pp, tebal 5 cm

Semen portland kg 46.5120 - -


Bahan
Pasir pasang m3 0.0480 235,000.00 11,280.00

Pekerja oh 0.3000 185,674.16 55,702.25

Tukang batu oh 0.1500 189,845.00 28,476.75


Tenaga
Kepala tukang oh 0.0150 206,315.00 3,094.73

Mandor oh 0.0150 218,291.00 3,274.37

Jumlah 101,828.09

Keuntungan Mak. 10% 10,182.81

Jumlah + Keuntungan 112,010.90

Dibulatkan 112,000.00

1 m2 Floor hardener t=3 mm

Bahan Floor hardener kg 7.0000 - -

Pekerja oh 0.1200 185,674.16 22,280.90

Tukang batu oh 0.1200 189,845.00 22,781.40


Tenaga
Kepala tukang oh 0.0120 206,315.00 2,475.78

Mandor oh 0.0060 218,291.00 1,309.75

Jumlah 48,847.83

Keuntungan Mak. 10% 4,884.78

Jumlah + Keuntungan 53,732.61

Dibulatkan 53,700.00

PENETAPAN INDEKS HARGA SATUAN PEKERJAAN PLAFOND

1 1 m2 Pasangan langit-langit akustik 60 x 60 cm + rangka aluminium

Profil alluminium "T" (panjang 3,6m) m1 3.6000 3,583.33 12,900.00

Kawat seng Polos kg 0.1500 - -


Bahan
Ramset/dina bolt bh 4.0000 - -

Akustik armstrong 60 x 60 cm lbr 1.5000 - -

Pekerja oh 0.1500 185,674.16 27,851.12

Tukang kayu oh 0.5000 189,845.00 94,922.50


Tenaga
Kepala tukang oh 0.0500 206,315.00 10,315.75

Mandor oh 0.0075 218,291.00 1,637.18

Jumlah 147,626.56

Keuntungan Mak. 12% 14,762.66

Jumlah + Keuntungan 162,389.21

Dibulatkan 162,300.00

2 1 m2 Pasangan rangka plafond besi hollow 40/40 & 20/40 mm galvanis

Hollow galvanis, uk. 40/40 mm, t=0,3 mm m1 1.2000 - -

Bahan Hollow galvanis, uk. 20/40 mm t=0,3 mm m1 1.2000 - -

Alat bantu (5% total bahan) ls 0.0500 - -

Pekerja oh 0.2000 185,674.16 37,134.83

Tukang kayu oh 0.2100 189,845.00 39,867.45


Tenaga
Kepala tukang oh 0.0320 206,315.00 6,602.08

Mandor oh 0.0320 218,291.00 6,985.31

Jumlah 90,589.67

Analisa Struktur Arsitektur Page 150


HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

Keuntungan Mak. 12% 9,058.97

Jumlah + Keuntungan 99,648.64

Dibulatkan 99,600.00

3 1 m2 Pasangan penutup plafond pvc tbl. 9 mm

Plafond PVC 1 x 30 cm lbr 3.3333 - -

Bahan Gypsum tape rol 0.0533 - -

Paku sekrup kg 0.0100 - -

Pekerja oh 0.1000 185,674.16 18,567.42

Tukang kayu oh 0.0500 189,845.00 9,492.25


Tenaga
Kepala tukang oh 0.0050 206,315.00 1,031.58

Mandor oh 0.0050 218,291.00 1,091.46

Jumlah 30,182.70

Keuntungan Mak. 12% 3,018.27

Jumlah + Keuntungan 33,200.97

Dibulatkan 33,200.00

4 1 m1 Pasangan list plafond shadow line tebal 3 mm

List Shadow line tebal 10 mm m1 1.1000 - -


Bahan
Paku sekrup kg 0.0100 - -

Pekerja oh 0.0500 185,674.16 9,283.71

Tukang kayu oh 0.0500 189,845.00 9,492.25


Tenaga
Kepala tukang oh 0.0050 206,315.00 1,031.58

Mandor oh 0.0030 218,291.00 654.87

Jumlah 20,462.41

Keuntungan Mak. 12% 2,046.24

Jumlah + Keuntungan 22,508.65

Dibulatkan 22,500.00

5 1 m2 Pasangan penutup plafond GRC tbl. 4 mm

GRC Board 4 mm Lbr 0.3470 - -


Bahan
Paku Skrup kg 0.0100 - -

Pekerja oh 0.0300 185,674.16 5,570.22

Tukang kayu oh 0.0700 189,845.00 13,289.15


Tenaga
Kepala tukang oh 0.0070 206,315.00 1,444.21

Mandor oh 0.0040 218,291.00 873.16

Jumlah 21,176.74

Keuntungan Mak. 12% 2,117.67

Jumlah + Keuntungan 23,294.42

Dibulatkan 23,200.00

6 1 m1 Pasangan List Plafond Gypsum lbr 10 cm

List gypsum profil m1 1.0500 - -


Bahan
Lem profil gypsum Compoun kg 0.1500 2,333.33 350.00

Pekerja oh 0.0600 185,674.16 11,140.45

Tukang kayu oh 0.0600 189,845.00 11,390.70


Tenaga
Kepala tukang oh 0.0060 206,315.00 1,237.89

Mandor oh 0.0030 218,291.00 654.87

Jumlah 24,773.91

Keuntungan Mak. 10% 2,477.39

Jumlah + Keuntungan 27,251.30

Dibulatkan 27,200.00

Analisa Struktur Arsitektur Page 151


HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

7 1 m1 Pasangan List Plafond Gypsum lbr 5 cm

List gypsum profil m1 1.0500 - -


Bahan
Lem profil gypsum Compoun kg 0.1500 2,333.33 350.00

Pekerja oh 0.0600 185,674.16 11,140.45

Tukang kayu oh 0.0600 189,845.00 11,390.70


Tenaga
Kepala tukang oh 0.0060 206,315.00 1,237.89

Mandor oh 0.0030 218,291.00 654.87

Jumlah 24,773.91

Keuntungan Mak. 10% 2,477.39

Jumlah + Keuntungan 27,251.30

Dibulatkan 27,200.00

8 1 m1 Pasangan list plafond kayu solid 1,5/10 cm

List kayu, kamper samarinda 1/15 cm m1 1.1000 - -


Bahan
Paku sekrup kg 0.0100 16,300.00 163.00

Pekerja oh 0.0500 185,674.16 9,283.71

Tukang kayu oh 0.0500 189,845.00 9,492.25


Tenaga
Kepala tukang oh 0.0050 206,315.00 1,031.58

Mandor oh 0.0030 218,291.00 654.87

Jumlah 20,625.41

Keuntungan Mak. 10% 2,062.54

Jumlah + Keuntungan 22,687.95

Dibulatkan 22,600.00

PENETAPAN INDEKS HARGA SATUAN PEKERJAAN PENGECATAN

1 1 m2 Pengecatan dinding, partisi dan plafond 1 lapis cat dasar, 2 lapis cat penutup (interior)

Plamur kg 0.1000 - -

Cat dasar jotun kg 0.1000 - -

Bahan Cat penutup 2xjotun, interior kg 0.2600 - -

Ampelas lbr 0.2500 - -

Rol cat bh 0.0200 - -

Pekerja oh 0.0200 185,674.16 3,713.48

Tukang cat oh 0.0630 189,845.00 11,960.24


Tenaga
Kepala tukang oh 0.0063 206,315.00 1,299.78

Mandor oh 0.0030 218,291.00 654.87

Jumlah 17,628.38

Keuntungan Mak. 12% 1,762.84

Jumlah + Keuntungan 19,391.21

Dibulatkan 19,300.00

2 1 m2 Pengecatan dinding, partisi dan plafond 1 lapis cat dasar, 2 lapis cat mural (interior)

Plamur kg 0.1000 - -

Cat dasar jotun kg 0.1000 - -

Bahan Cat penutup mural momilex kg 0.2600 - -

Ampelas lbr 0.2500 - -

Rol cat bh 0.0200 - -

Pekerja oh 0.0200 185,674.16 3,713.48

Tukang cat oh 0.0630 189,845.00 11,960.24


Tenaga
Kepala tukang oh 0.0063 206,315.00 1,299.78

Mandor oh 0.0030 218,291.00 654.87

Analisa Struktur Arsitektur Page 152


HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

Jumlah 17,628.38

Keuntungan Mak. 12% 1,762.84

Jumlah + Keuntungan 19,391.21

Dibulatkan 19,300.00

3 1 m2 Pengecatan dinding, partisi dan plafond 1 lapis cat dasar, 2 lapis cat penutup (eksterior)

Plamur kg 0.1000 - -

Cat dasar jotun kg 0.1000 - -

Bahan Cat penutup 2xjotun, eksterior kg 0.2600 - -

Ampelas lbr 0.2500 - -

Rol cat bh 0.0200 - -

Pekerja oh 0.0200 185,674.16 3,713.48

Tukang cat oh 0.0630 189,845.00 11,960.24


Tenaga
Kepala tukang oh 0.0063 206,315.00 1,299.78

Mandor oh 0.0030 218,291.00 654.87

Jumlah 17,628.38

Keuntungan Mak. 12% 1,762.84

Jumlah + Keuntungan 19,391.21

Dibulatkan 19,300.00

2 1 m2 Pengecatan LAPANGAN

Teknoke kg 0.1000 - -

Bahan Cat dasar kg 0.1000 - -

Cat Penutup kg 0.2600 - -

Pekerja oh 0.0200 185,674.16 3,713.48

Tukang cat oh 0.0630 189,845.00 11,960.24


Tenaga
Kepala tukang oh 0.0063 206,315.00 1,299.78

Mandor oh 0.0030 218,291.00 654.87

Jumlah 17,628.38

Keuntungan Mak. 12% 1,762.84

Jumlah + Keuntungan 19,391.21

Dibulatkan 19,300.00

3 1 m2 Finishing melamik

Wood Filler kg 0.1500 51,200.00 7,680.00

Woodstain ltr 0.2500 - -

Sending sealer ltr 0.3500 - -

Bahan Melamic top coat ltr 0.2500 - -

Analisa Struktur Arsitektur Page 153


HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
Bahan ( Rp ) ( Rp )

Thinner ltr 0.5000 - -

Amplas lbr 0.5000 - -

Alat bantu (alat semprot, dll) ls 0.1000 7,680.00 768.00

Pekerja oh 0.5000 185,674.16 92,837.08

Tukang cat oh 0.5000 189,845.00 94,922.50


Tenaga
Kepala tukang oh 0.0500 206,315.00 10,315.75

Mandor oh 0.0050 218,291.00 1,091.46

Jumlah 207,614.79

Keuntungan Mak. 10% 20,761.48

Jumlah + Keuntungan 228,376.26

Dibulatkan 228,300.00

4 1 m2 Pasangan HPL

HPL Tipe Quateline Natural TH 151 AA m2 1.1000 - -


Bahan
Lem Kuning kg 0.2500 28,000.00 7,000.00

Pekerja oh 0.1750 185,674.16 32,492.98

Tukang kayu oh 0.3500 189,845.00 66,445.75


Tenaga
Kepala tukang oh 0.0170 206,315.00 3,507.36

Mandor oh 0.0020 218,291.00 436.58

Jumlah 109,882.67

Keuntungan Mak. 10% 10,988.27

Jumlah + Keuntungan 0.3472 120,870.93

Dibulatkan 120,800.00

3 1 m2 Pengecatan permukaan baja dengan cat Besi

Cat Besi avian kg 0.1000 68,000.00 6,800.00


Bahan
Kwas 4" bh 0.0100 #NAME? #NAME?

Pekerja oh 0.0200 185,674.16 3,713.48

Tukang cat oh 0.2000 189,845.00 37,969.00


Tenaga
Kepala tukang oh 0.0200 206,315.00 4,126.30

Mandor oh 0.0100 218,291.00 2,182.91

Jumlah #NAME?

Keuntungan Mak. 12% #NAME?

Jumlah + Keuntungan #NAME?

Dibulatkan #NAME?

PENETAPAN INDEKS HARGA SATUAN PEKERJAAN SANITARY

1 1 unit Pasang closet duduk, TOTO (CW 421 J - SW420JP)

Bahan Closet duduk, TOTO (CW 705 ENJ) + TCW07SV2 bh 1.0000 - -

Perlengkapan 6% X CLOSET LS 0.0600 - -

Pekerja oh 3.3000 185,674.16 612,724.73

Tukang batu oh 1.1000 189,845.00 208,829.50


Tenaga
Kepala tukang oh 0.0100 206,315.00 2,063.15

Mandor oh 0.1600 218,291.00 34,926.56

Jumlah 858,543.94

Keuntungan Mak. 12% 85,854.39

Jumlah + Keuntungan 944,398.33

Dibulatkan 944,300.00

2 1 unit Pasang closet duduk,

Bahan Closet duduk, TOTO (CW 420J) + TCW07SV2 bh 1.0000 - -

Analisa Struktur Arsitektur Page 154


HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

Perlengkapan 6% X CLOSET LS 0.0600 - -

Pekerja oh 3.3000 185,674.16 612,724.73

Tukang batu oh 1.1000 189,845.00 208,829.50


Tenaga
Kepala tukang oh 0.0100 206,315.00 2,063.15

Mandor oh 0.1600 218,291.00 34,926.56

Jumlah 858,543.94

Keuntungan Mak. 12% 85,854.39

Jumlah + Keuntungan 944,398.33

Dibulatkan 944,300.00

2 1 unit Pasang closet jongkok flush, TOTO (CE 6 - TV150SNJ)

Bahan Closet jongkok, TOTO (CE 9) bh 1.0000 - -

Semen Portland kg 6.0000 - -

Pasir pasang m3 0.0100 - -

Pekerja oh 1.0000 185,674.16 185,674.16

Tukang batu oh 1.5000 189,845.00 284,767.50


Tenaga
Kepala tukang oh 0.1500 206,315.00 30,947.25

Mandor oh 0.1600 218,291.00 34,926.56

Jumlah 536,315.47

Keuntungan Mak. 12% 53,631.55

Jumlah + Keuntungan 589,947.02

Dibulatkan 589,900.00

3 1 unit Pasang wastafel

Wastafel, TOTO (L529V1) bh 1.2000 - -

Perlengkapan (12% harga wastafel) ls 1.0000 - -

Bahan Semen portland kg 6.0000 - -

Pasir pasang m3 0.0100 235,000.00 2,350.00

Afur lengkap set 1.0000 250,000.00 250,000.00

Pekerja oh 1.2000 185,674.16 222,808.99

Tukang batu oh 1.4500 189,845.00 275,275.25


Tenaga
Kepala tukang oh 0.1500 206,315.00 30,947.25

Mandor oh 0.0600 218,291.00 13,097.46

Jumlah 794,478.95

Keuntungan Mak. 12% 79,447.90

Jumlah + Keuntungan 873,926.85

Dibulatkan 873,900.00

4 1 unit Pasang urinoir, TOTO (U57M)

Urinoir, TOTO (U57M) bh 1.0000 - -

Perlengkapan (30%) ls 1.0000 - -


Bahan
Semen portland kg 6.0000 - -

Pasir pasang m3 0.0100 235,000.00 2,350.00

Pekerja oh 1.0000 185,674.16 185,674.16

Tukang batu oh 1.0000 189,845.00 189,845.00


Tenaga
Kepala tukang oh 0.1000 206,315.00 20,631.50

Mandor oh 0.0500 218,291.00 10,914.55

Jumlah 409,415.21

Keuntungan Mak. 12% 40,941.52

Jumlah + Keuntungan 450,356.73

Analisa Struktur Arsitektur Page 155


HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

Dibulatkan 450,300.00

5 1 unit Pasang jet washer, TOTO (THX 20 NB)

Jet washer, TOTO (THX 20MCRB) bh 1.0000 - -


Bahan
Alat bantu + asessories ls 1.0000 - -

Pekerja oh 0.0100 185,674.16 1,856.74

Tukang batu oh 0.1000 189,845.00 18,984.50


Tenaga
Kepala tukang oh 0.0100 206,315.00 2,063.15

Mandor oh 0.0050 218,291.00 1,091.46

Jumlah 23,995.85

Keuntungan Mak. 12% 2,399.58

Jumlah + Keuntungan 26,395.43

Dibulatkan 26,300.00

6 1 unit Pasang floor drain, TOTO (TX 1 C)

Bahan Floor drain, TOTO (TX 1BN) bh 1.0000 - -

Pekerja oh 0.0100 185,674.16 1,856.74

Tukang batu oh 0.1000 189,845.00 18,984.50


Tenaga
Kepala tukang oh 0.0100 206,315.00 2,063.15

Mandor oh 0.0050 218,291.00 1,091.46

Jumlah 23,995.85

Keuntungan Mak. 12% 2,399.58

Jumlah + Keuntungan 26,395.43

Dibulatkan 26,300.00

7 1 unit Pasang kran wastafel, TOTO (TX101LB)

Kran wastafel TOTO (TX101LB) bh 1.0000 132,000.00 132,000.00


Bahan
Alat bantu + asessories ls 1.0000 13,200.00 13,200.00

Pekerja oh 0.0100 185,674.16 1,856.74

Tukang batu oh 0.1000 189,845.00 18,984.50


Tenaga
Kepala tukang oh 0.0100 206,315.00 2,063.15

Mandor oh 0.0050 218,291.00 1,091.46

Jumlah 169,195.85

Keuntungan Mak. 12% 16,919.58

Jumlah + Keuntungan 186,115.43

Dibulatkan 186,100.00

8 1 unit Pasang kran dinding, TOTO (T23B13V7NB)

Kran dinding, TOTO (T23B13V7NB) bh 1.0000 - -


Bahan
Seal tape bh 0.0250 375,000.00 9,375.00

Pekerja oh 0.0100 185,674.16 1,856.74

Tukang batu oh 0.1000 189,845.00 18,984.50


Tenaga
Kepala tukang oh 0.0100 206,315.00 2,063.15

Mandor oh 0.0050 218,291.00 1,091.46

Jumlah 33,370.85

Keuntungan Mak. 12% 3,337.08

Jumlah + Keuntungan 36,707.93

Dibulatkan 36,700.00

Analisa Struktur Arsitektur Page 156


HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

9 1 unit Pasang kran dinding + shower, TOTO (TX423ST1)

Kran dinding + shower, TOTO (TX423ST1) bh 1.0000 - -


Bahan
Seal tape bh 0.0250 375,000.00 9,375.00

Pekerja oh 0.0100 185,674.16 1,856.74

Tukang batu oh 0.1000 189,845.00 18,984.50


Tenaga
Kepala tukang oh 0.0100 206,315.00 2,063.15

Mandor oh 0.0050 218,291.00 1,091.46

Jumlah 33,370.85

Keuntungan Mak. 12% 3,337.08

Jumlah + Keuntungan 36,707.93

Dibulatkan 36,700.00

10 1 unit Pasang hand shower, TOTO (THX19B)

Hand shower, TOTO (THX19B) bh 1.0000 5,474,000.00 5,474,000.00


Bahan
Alat bantu + asessories ls 1.0000 547,400.00 547,400.00

Pekerja oh 0.0100 185,674.16 1,856.74

Tukang batu oh 0.1000 189,845.00 18,984.50


Tenaga
Kepala tukang oh 0.0100 206,315.00 2,063.15

Mandor oh 0.0050 218,291.00 1,091.46

Jumlah 6,045,395.85

Keuntungan Mak. 12% 604,539.58

Jumlah + Keuntungan 6,649,935.43

Dibulatkan 6,649,900.00

11 1 unit Pasangan tissue holder, TOTO (TX 720 ACRB)

Tissue Holder, TOTO (TX 720 ACRB) bh 1.0000 3,130,000.00 3,130,000.00


Bahan
Alat bantu + asessories ls 1.0000 313,000.00 313,000.00

Pekerja oh 0.0100 185,674.16 1,856.74

Tukang batu oh 0.1000 189,845.00 18,984.50


Tenaga
Kepala tukang oh 0.0100 206,315.00 2,063.15

Mandor oh 0.0050 218,291.00 1,091.46

Jumlah 3,466,995.85

Keuntungan Mak. 12% 346,699.58

Jumlah + Keuntungan 3,813,695.43

Dibulatkan 3,813,600.00

12 1 unit Pasangan divider urinoir, TOTO (A 100)

Divider urinoir, TOTO (A 100) bh 1.0000 1,392,000.00 1,392,000.00


Bahan
Perlengkapan (15%) ls 1.0000 208,800.00 208,800.00

Pekerja oh 1.0000 185,674.16 185,674.16

Tukang batu oh 1.0000 189,845.00 189,845.00


Tenaga
Analisa Struktur Arsitektur Page 157
HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )
Tenaga
Kepala tukang oh 0.1000 206,315.00 20,631.50

Mandor oh 0.1000 218,291.00 21,829.10

Jumlah 2,018,779.76

Keuntungan Mak. 12% 201,877.98

Jumlah + Keuntungan 2,220,657.74

Dibulatkan 2,220,600.00

13 1 unit Pasangan kitchen sink, TOTO Standar

Kitchen sink, TOTO Standar bh 1.0000 - -


Bahan
Water drain asesories ls 1.0000 - -

Pekerja oh 0.0300 185,674.16 5,570.22

Tukang batu oh 0.3000 189,845.00 56,953.50


Tenaga
Kepala tukang oh 0.0300 206,315.00 6,189.45

Mandor oh 0.0015 218,291.00 327.44

Jumlah 69,040.61

Keuntungan Mak. 12% 6,904.06

Jumlah + Keuntungan 75,944.67

Dibulatkan 75,900.00

14 1 unit Pasangan kran kitchen, TOTO (TX 603KM)

Kran Kitchen, TOTO (TX 603KM) bh 1.0000 - -


Bahan
Alat bantu + asessories ls 1.0000 - -

Pekerja oh 0.0100 185,674.16 1,856.74

Tukang batu oh 0.1000 189,845.00 18,984.50


Tenaga
Kepala tukang oh 0.0100 206,315.00 2,063.15

Mandor oh 0.0050 218,291.00 1,091.46

Jumlah 23,995.85

Keuntungan Mak. 12% 2,399.58

Jumlah + Keuntungan 26,395.43

Dibulatkan 26,300.00

15 1 unit Pasangan roof drain, San-Ei (H01)

Roof drain 4", San-Ei type H01 bh 1.0000 - -


Bahan
Perlengkapan (6%) ls 1.0000 - -

Pekerja oh 0.0100 185,674.16 1,856.74

Tukang batu oh 0.1000 189,845.00 18,984.50


Tenaga
Kepala tukang oh 0.0100 206,315.00 2,063.15

Mandor oh 0.0050 218,291.00 1,091.46

Jumlah 23,995.85

Keuntungan Mak. 12% 2,399.58

Jumlah + Keuntungan 26,395.43

Dibulatkan 26,300.00

16 1 unit Pasangan kaca cermin 5 mm uk. 153 x 100 cm

Kaca cermin 5 mm m2 1.5300 - -


Bahan
Alat bantu + bevel kaca lebar 2 cm ls 1.0000 - -

Pekerja oh 1.0000 185,674.16 185,674.16

Tukang batu oh 0.5000 189,845.00 94,922.50


Tenaga
Kepala tukang oh 0.5000 206,315.00 103,157.50

Mandor oh 0.1000 218,291.00 21,829.10

Jumlah 405,583.26

Keuntungan Mak. 12% 40,558.33

Analisa Struktur Arsitektur Page 158


HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

Jumlah + Keuntungan 446,141.59

Dibulatkan 446,100.00

17 1 unit Pasangan kaca cermin 5 mm uk. 143 x 100 cm

Kaca cermin 5 mm m2 1.4300 - -


Bahan
Alat bantu + bevel kaca lebar 2 cm ls 1.0000 - -

Pekerja oh 1.0000 185,674.16 185,674.16

Tukang batu oh 0.5000 189,845.00 94,922.50


Tenaga
Kepala tukang oh 0.5000 206,315.00 103,157.50

Mandor oh 0.1000 218,291.00 21,829.10

Jumlah 405,583.26

Keuntungan Mak. 12% 40,558.33

Jumlah + Keuntungan 446,141.59

Dibulatkan 446,100.00

18 1 unit Pasangan kaca cermin 5 mm uk. 100 x 100 cm

Kaca cermin 5 mm m2 1.0000 - -


Bahan
Alat bantu + bevel kaca lebar 2 cm ls 1.0000 - -

Pekerja oh 1.0000 185,674.16 185,674.16

Tukang batu oh 0.5000 189,845.00 94,922.50


Tenaga
Kepala tukang oh 0.5000 206,315.00 103,157.50

Mandor oh 0.1000 218,291.00 21,829.10

Jumlah 405,583.26

Keuntungan Mak. 12% 40,558.33

Jumlah + Keuntungan 446,141.59

Dibulatkan 446,100.00

19 1 unit Pasangan kaca cermin 5 mm uk. 0,8 x 100 cm

Kaca cermin 5 mm m2 0.8000 - -


Bahan
Alat bantu + bevel kaca lebar 2 cm ls 1.0000 - -

Pekerja oh 1.0000 185,674.16 185,674.16

Tukang batu oh 0.5000 189,845.00 94,922.50


Tenaga
Kepala tukang oh 0.5000 206,315.00 103,157.50

Mandor oh 0.1000 218,291.00 21,829.10

Jumlah 405,583.26

Keuntungan Mak. 12% 40,558.33

Jumlah + Keuntungan 446,141.59

Dibulatkan 446,100.00

20 1 m1 Meja beton lebar 50 cm, tebal 15 cm, finished HT 60x60 cm polished hitam

Beton bertulang m3 0.0900 3,000,000.00 270,000.00


Bahan & Upah
HT 60x60 cm polished hitam m2 0.8000 79,968.64 63,974.92

Jumlah 333,974.92

Keuntungan Mak. 12% 33,397.49

Jumlah + Keuntungan 367,372.41

Dibulatkan 367,300.00

21 1 m1 Meja beton lebar 60 cm, tebal 15 cm, finished keramik 20x20 cm

Beton bertulang m3 0.1050 3,000,000.00 315,000.00


Bahan & Upah
Keramik 20x20 cm m2 0.8000 137,588.28 110,070.62

Jumlah 425,070.62

Keuntungan Mak. 13% 42,507.06

Analisa Struktur Arsitektur Page 159


HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

Jumlah + Keuntungan 467,577.68

Dibulatkan 467,500.00

PENETAPAN INDEKS HARGA SATUAN PEKERJAAN RAILING TANGGA & RAMP

1 1 m1 Pasangan railing tangga besi hollow 50 x 50 x 2 mm

Hollow 50 x 50 x 2 mm m1 1.1000 - -

Bahan Pengelasan ttk 4.0000 15,000.00 60,000.00

Cat Besi m2 0.1200 #NAME? #NAME?

Pekerja oh 0.0500 185,674.16 9,283.71

Tukang besi oh 0.0500 189,845.00 9,492.25


Tenaga
Kepala tukang oh 0.0050 - -

Mandor oh 0.0030 218,291.00 654.87

Jumlah #NAME?

Keuntungan Mak. 10% #NAME?

Jumlah + Keuntungan #NAME?

Dibulatkan #NAME?

2 1 m1 Pasangan railing tangga besi hollow 20 x 40 x 2 mm

Hollow 20 x 40 x 2 mm m1 1.1000 47,500.00 52,250.00

Bahan Pengelasan ttk 4.0000 15,000.00 60,000.00

Cat Besi m2 0.1200 #NAME? #NAME?

Pekerja oh 0.0500 185,674.16 9,283.71

Tukang besi oh 0.0500 189,845.00 9,492.25


Tenaga
Kepala tukang oh 0.0050 - -

Mandor oh 0.0030 218,291.00 654.87

Jumlah #NAME?

Keuntungan Mak. 10% #NAME?

Jumlah + Keuntungan #NAME?

Dibulatkan #NAME?

3 1 m1 Pasangan hand railing kayu solid 5 x 7 cm

Kayu Kamper Samarinda m3 0.0043 15,313,000.00 66,152.16

Bahan Paku sekrup kg 0.0100 16,300.00 163.00

Melamik m2 0.2800 207,614.79 58,132.14

Pekerja oh 0.0500 185,674.16 9,283.71

Tukang besi oh 0.0500 189,845.00 9,492.25


Tenaga
Kepala tukang oh 0.0050 - -

Mandor oh 0.0030 218,291.00 654.87

Jumlah 143,878.13

Keuntungan Mak. 10% 14,387.81

Jumlah + Keuntungan 158,265.94

Dibulatkan 158,200.00

1 1 m1 Pasangan pipa stainless steel dia. 2" tebal 1,20 mm

Pipa Stainless Steel dia 2", t = 1 mm m1 2.1000 - -

Bahan Kawat Las Nikko Steel NSN 308, 2 mm kg 0.5500 - -

Penghalusan (3,5% harga pipa) 0.0350 - -

Pekerja oh 0.4150 185,674.16 77,054.78

Tukang las oh 0.2075 189,845.00 39,392.84


Tenaga
Kepala tukang oh 0.0208 - -

Mandor oh 0.0208 218,291.00 4,540.45

Analisa Struktur Arsitektur Page 160


HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

Jumlah 120,988.07

Keuntungan Mak. 13% 12,098.81

Jumlah + Keuntungan 133,086.87

Dibulatkan 133,000.00

2 1 m1 Pasangan pipa stainless steel dia. 1,5" tebal 1,20 mm

Pipa besi stainless stell 304 Ø 2'' tb. 1 mm m1 1.2000 - -


Bahan
Perlengkapan (35% harga pipa) ls 1.0000 - -

Pekerja oh 0.1080 185,674.16 20,052.81

Tukang besi oh 0.1800 189,845.00 34,172.10


Tenaga
Kepala tukang oh 0.0180 - -

Mandor oh 0.0054 218,291.00 1,178.77

Jumlah 55,403.68

Keuntungan Mak. 13% 5,540.37

Jumlah + Keuntungan 60,944.05

Dibulatkan 60,900.00

3 1 m1 Pasangan railling tangga, handrail SS 2,5", tiang SS 2" & pengisi SS 1,5" tebal 1,20 mm

Pipa SS 2,5" m1 9.8300 151,235.08 1,486,640.87

Bahan & Tenaga Pipa SS 2" m1 9.5000 120,988.07 1,149,386.63

Pipa SS 1,5" m1 29.4900 55,403.68 1,633,854.54

Jumlah (P=9,68 m) 4,269,882.05

Jumlah (P=1 m) 441,103.52

Keuntungan Mak. 12% 44,110.35

Jumlah + Keuntungan 485,213.87

Dibulatkan 485,200.00

Catatan : analisa terhadap railling 9,68 m1

4 1 m1 Pasangan railling ramp, handrail SS 2,5", tiang SS 2" & pengisi SS 1,5" tebal 1,20 mm

Pipa SS 2,5" m1 6.2200 151,235.08 940,682.22

Bahan & Tenaga Pipa SS 2" m1 4.5000 120,988.07 544,446.30

Pipa SS 1,5" m1 19.8300 55,403.68 1,098,654.99

Jumlah (P=6,61 m) 2,583,783.51

Jumlah (P=1 m) 390,890.09

Keuntungan Mak. 12% 39,089.01

Jumlah + Keuntungan 429,979.10

Dibulatkan 429,900.00

Catatan : analisa terhadap railling 6,61 m1

5 1 bh Tangga SS 2" tebal 1,20 mm, tinggi 467 cm, lebar 40 cm, 11 bh anak tangga.

Pipa SS 2" m1 14.2900 151,235.08 2,161,149.34


Bahan & Tenaga

Jumlah 2,161,149.34

Keuntungan Mak. 12% 216,114.93

Jumlah + Keuntungan 2,377,264.28

Dibulatkan 2,377,200.00

Analisa Struktur Arsitektur Page 161


HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

PENETAPAN INDEKS HARGA SATUAN PEKERJAAN ATAP

1 1 m2 Pasangan rangka atap baja ringan

Kuda-kuda baja ringan termasuk rangka kaso dan reng, bentang 12


Bahan & Upah m2 1.0000 - -
s/d 15 m

Jumlah -

Keuntungan Mak. 10% -

Jumlah + Keuntungan -

Dibulatkan -

2 1 m2 Pasangan atap Spandek

Atap spandek 0,45 mm m2 1.0000 - -


Bahan
Paku/sekrup bh 9.1000 - -

Pekerja oh 0.1400 185,674.16 25,994.38

Tukang kayu oh 0.0700 189,845.00 13,289.15


Tenaga
Kepala tukang oh 0.0070 206,315.00 1,444.21

Mandor oh 0.0070 218,291.00 1,528.04

Jumlah 42,255.77

Keuntungan Mak. 10% 4,225.58

Jumlah + Keuntungan 46,481.35

Dibulatkan 46,400.00

3 1 m1 Pasangan nok Alumunium

Nok alumunium lbr 1.2500 - -


Bahan
Sekrup/paku bh 8.3360 - -

Pekerja oh 0.0840 185,674.16 15,596.63

Tukang kayu oh 0.1250 189,845.00 23,730.63


Tenaga
Kepala tukang oh 0.0125 206,315.00 2,578.94

Mandor oh 0.0040 218,291.00 873.16

Jumlah 42,779.36

Keuntungan Mak. 10% 4,277.94

Jumlah + Keuntungan 47,057.29

Dibulatkan 47,000.00

4 1 m1 Pasangan talang seng zincalume lebar 60 cm

Seng zincalume lebar 60 cm tb. 1 mm m1 1.0250 - -


Bahan
Paku Sekrup kg 0.0150 16,300.00 244.50

Pekerja oh 0.0500 185,674.16 9,283.71

Tukang kayu oh 0.1200 189,845.00 22,781.40


Tenaga
Kepala tukang oh 0.0120 206,315.00 2,475.78

Mandor oh 0.0120 218,291.00 2,619.49

Jumlah 37,404.88

Keuntungan Mak. 10% 3,740.49

Jumlah + Keuntungan 41,145.37

Dibulatkan 41,100.00

5 1 m2 Pemasangan alumunium foil/sisalation

Bahan Alumunium foil double side m2 1.0500 - -

Pekerja oh 0.1500 185,674.16 27,851.12

Tukang kayu oh 0.0500 189,845.00 9,492.25


Tenaga
Kepala tukang oh 0.0050 206,315.00 1,031.58

Mandor oh 0.0080 218,291.00 1,746.33

Analisa Struktur Arsitektur Page 162


HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

Jumlah 40,121.28

Keuntungan Mak. 10% 4,012.13

Jumlah + Keuntungan 44,133.40

Dibulatkan 44,100.00

PENETAPAN INDEKS HARGA SATUAN PEKERJAAN SARANA & PRASARANA

1 1 m1 Saluran Terbuka U-Ditch 30x40x120 cm, t=5 cm

Bahan U-DITCH, uk. 30x40x120 cm, tebal 5 cm bh 0.8333 - -

Alat Alat bantu ls 1.0000 7,500.00 7,500.00

Pekerja oj 1.1667 26,524.88 30,945.69

Tenaga Tukang oj 0.4667 27,120.71 12,656.33

Mandor oj 0.2333 31,184.43 7,276.37

Jumlah 58,378.39

Keuntungan Mak. 12% 5,837.84

Jumlah + Keuntungan 64,216.23

Dibulatkan 64,200.00

2 1 m1 Penutup Saluran Terbuka U-Ditch 40x60 cm, t=5 cm

Bahan Penutup U-DITCH, uk. 40x60 cm, tebal 5 cm bh 1.6667 - -

Alat Alat bantu ls 1.0000 5,000.00 5,000.00

Pekerja oj 0.5833 26,524.88 15,472.85

Tenaga Tukang oj 0.2333 27,120.71 6,328.17

Mandor oj 0.1167 31,184.43 3,638.18

Jumlah 30,439.20

Keuntungan Mak. 12% 3,043.92

Jumlah + Keuntungan 33,483.12

Dibulatkan 33,400.00

3 1 m2 Pasang Paving Block Lokal t=8 cm

Paving Block Hexagon Press t=8 cm m2 1.0500 - -


Bahan
Abu batu m3 0.0525 - -

Alat Alat bantu ls 1.0000 2,500.00 2,500.00

Pekerja oj 0.3684 26,524.88 9,772.32

Tukang oj 0.0737 27,120.71 1,998.37


Tenaga
Kepala tukang oj 0.0737 29,473.57 2,171.74

Mandor oj 0.0368 31,184.43 1,148.90

Jumlah 17,591.33

Keuntungan Mak. 12% 1,759.13

Jumlah + Keuntungan 19,350.46

Dibulatkan 19,300.00

4 1 m1 Pasang Kansteen DKI 15x30x40 cm

Kansteen DKI 15x30x40 cm bh 2.6250 2,295,000.00 6,024,375.00

Bahan Semen Tiga Roda 50 kg kg 2.3766 - -

Pasir Pasang m3 0.0066 235,000.00 1,551.00

Alat Alat bantu ls 1.0000 5,000.00 5,000.00

Pekerja oj 0.2857 26,524.88 7,578.54

Tukang oj 0.0571 27,120.71 1,549.76


Tenaga
Analisa Struktur Arsitektur Page 163
HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )
Tenaga
Kepala tukang oj 0.0571 29,473.57 1,684.20

Mandor oj 0.0286 31,184.43 890.98

Jumlah 6,042,629.48

Keuntungan Mak. 12% 604,262.95

Jumlah + Keuntungan 6,646,892.43

Dibulatkan 6,646,800.00

5 1 unit Pintu pagar gerbang depan

Besi hollow 50 x 50 x 3 mm m1 34.0800 - -

Plat Besi Ornamen Betawi t = 1,2 mm kg 106.9200 - -

Engsel Pintu Gerbang bh 6.0000 50,000.00 300,000.00


Bahan & Tenaga
Roda Baja bh 4.0000 75,000.00 300,000.00

Cat Besi m2 22.0000 - -

Biaya Pengelasan ls 1.0000 60,000.00 60,000.00

Jumlah 660,000.00

Dibulatkan 660,000.00

6 1 unit Pasangan car stoper pipa besi dia. 3" tebal = 4 mm

Pipa Besi dia. 3" m1 2.7000 153,600.00 414,720.00


Bahan dan
Cat Besi m2 0.6359 - -
Tenaga
Angkur dia 16 mm dan baut bh 8.0000 25,000.00 200,000.00

Jumlah 614,720.00

Dibulatkan 614,700.00

Pekerjaan Atap

1 1 m2 Pasang Kuda-kuda baja ringan + reng untuk atap

Profil Baja Ringan Truss C-75.80 SNI , 0.8 @ 6m Merk Taso Per m' m' 1.488 21,583.33 32,116.00

Profil Baja Ringan Truss C-75.70 SNI , 0.70 @ 6m Merk BMT Per m' m' 2.232 17,833.33 39,804.00

Bahan Self Drilling Screw dia 10 x 19 mm (Screw Truss) bh 28.000 200.00 5,600.00

Dynabolt 12 mm bh 1.600 2,000.00 3,200.00

Profil Baja Ringan Reng 32.45, T 0.45@ 6 m Merk Taso Per m' m' 3.600 6,983.33 25,140.00

Alat Alat bantu ls 1.000 10,000.00 10,000.00

Pekerja oh 0.200 185,674.16 37,134.83

Tukang Besi oh 0.225 189,845.00 42,715.13


Tenaga
Kepala tukang Besi oh 0.010 - -

Mandor oh 0.050 218,291.00 10,914.55

Jumlah 206,624.51

Keuntungan Mak. 12% 20,662.45

Jumlah + Keuntungan 227,286.96

Dibulatkan 227,200.00

2 1 m2 Pasang Genteng Keramik

Bahan Genteng Keramik bh 14.000 9,700.00 135,800.00

Alat Alat bantu ls 1.000 10,000.00 10,000.00

Pekerja oh 0.150 185,674.16 27,851.12

Tukang Kayu oh 0.060 189,845.00 11,390.70


Tenaga
Kepala Tukang Kayu oh 0.006 206,315.00 1,237.89

Mandor oh 0.008 218,291.00 1,746.33

Jumlah 188,026.04

Keuntungan Mak. 12% 18,802.60

Jumlah + Keuntungan 206,828.65

Dibulatkan 206,800.00

Analisa Struktur Arsitektur Page 164


HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

3 1 m1 Pasang Bubungan / Nok Genteng keramik

Genteng Bubungan/Nok Keramik bh 4.000 27,500.00 110,000.00

Bahan Semen Portland kg 8.000 - -

Pasir Pasang m3 0.032 235,000.00 7,520.00

Alat Alat bantu ls 1.000 10,000.00 10,000.00

Pekerja oh 0.150 185,674.16 27,851.12

Tukang Kayu oh 0.060 189,845.00 11,390.70


Tenaga
Kepala Tukang Kayu oh 0.006 206,315.00 1,237.89

Mandor oh 0.008 218,291.00 1,746.33

Jumlah 169,746.04

Keuntungan Mak. 12% 16,974.60

Jumlah + Keuntungan 186,720.65

Dibulatkan 186,700.00

4 1 m1 Pasang Atap Asbes Gelombang

Asbes Gelombang lbr 0.300 98,000.00 29,400.00


Bahan
Paku Sekrup (Payung) kg 0.040 26,063.00 1,042.52

Alat Alat bantu ls 1.000 10,000.00 10,000.00

Pekerja oh 0.015 185,674.16 2,785.11

Tukang Kayu oh 0.070 189,845.00 13,289.15


Tenaga
Kepala Tukang Kayu oh 0.008 206,315.00 1,650.52

Mandor oh 0.005 218,291.00 1,091.46

Jumlah 59,258.76

Keuntungan Mak. 12% 5,925.88

Jumlah + Keuntungan 65,184.63

Dibulatkan 65,100.00

Analisa Pekerjaan Bongkaran

1 1 m2 Pembongkaran Rangka Atap, Reng, Kaso (Bongkaran Tidak Dipakai Kembali)

Pekerja oh 0.1500 185,674.16 27,851.12

Tukang Kayu oh 0.0750 189,845.00 14,238.38


Tenaga
Kepala tukang kayu oh 0.0075 206,315.00 1,547.36

Mandor oh 0.0150 218,291.00 3,274.37

Jumlah 46,911.23

Keuntungan Mak. 12% 4,691.12

Jumlah + Keuntungan 51,602.35

Dibulatkan 51,600.00

2 1 m2 Pekerjaan Bongkar Genteng

Pekerja oh 0.1000 185,674.16 18,567.42


Tenaga
Mandor oh 0.0100 218,291.00 2,182.91

Jumlah 20,750.33

Keuntungan Mak. 12% 2,075.03

Jumlah + Keuntungan 22,825.36

Dibulatkan 22,800.00

3 1 m2 Pekerjaan Pembongkaran Plafond dan Rangka (Bongkaran Tidak Dipakai Kembali)

Pekerja oh 0.0700 185,674.16 12,997.19


Tenaga
Mandor oh 0.0100 218,291.00 2,182.91

Jumlah 15,180.10

Keuntungan Mak. 12% 1,518.01

Analisa Struktur Arsitektur Page 165


HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

Jumlah + Keuntungan 16,698.11

Dibulatkan 16,600.00

4 1 m2 Pekerjaan Pembongkaran Keramik

Pekerja oh 0.0100 185,674.16 1,856.74


Tenaga
Mandor oh 0.0500 218,291.00 10,914.55

Jumlah 12,771.29

Keuntungan Mak. 12% 1,277.13

Jumlah + Keuntungan 14,048.42

Dibulatkan 14,000.00

5 1 buah Pekerjaan Pembongkaran Kloset

Pekerja oh 0.2000 185,674.16 37,134.83


Tenaga
Mandor oh 0.0200 218,291.00 4,365.82

Jumlah 41,500.65

Keuntungan Mak. 12% 4,150.07

Jumlah + Keuntungan 45,650.72

Dibulatkan 45,600.00

6 1 M3 Pembongkaran Pasangan Dinding Bata

Pekerja oh 6.6670 185,674.16 1,237,889.62


Tenaga
Mandor oh 0.3330 218,291.00 72,690.90

Jumlah 1,310,580.53

Keuntungan Mak. 12% 131,058.05

Jumlah + Keuntungan 1,441,638.58

Dibulatkan 1,441,600.00

7 1 M3 Pekerjaan Pembongkaran Kusen Pintu dan Jendela

Pekerja oh 0.6400 185,674.16 118,831.46

Tenaga Tukang Kayu oh 0.1100 189,845.00 20,882.95

Mandor oh 0.4000 218,291.00 87,316.40

Jumlah 227,030.81

Keuntungan Mak. 12% 22,703.08

Jumlah + Keuntungan 249,733.89

Dibulatkan 249,700.00

8 1 titik Pekerjaan Pembongkaran Instalasi Listrik dan Armartur

Pekerja oh 0.1000 185,674.16 18,567.42


Tenaga
Mandor oh 0.0050 218,291.00 1,091.46

Jumlah 19,658.87

Keuntungan Mak. 12% 1,965.89

Jumlah + Keuntungan 21,624.76

Dibulatkan 21,600.00

8 1 M2 Pekerjaan Bongkaran Pintu Tralis Besi Pagar Eksisting

Pekerja oh 0.0200 185,674.16 3,713.48


Tenaga
Mandor oh 0.0080 218,291.00 1,746.33

Jumlah 5,459.81

Keuntungan Mak. 12% 545.98

Jumlah + Keuntungan 6,005.79

Dibulatkan 6,000.00

Analisa Struktur Arsitektur Page 166


HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

9 1 M3 Pembongkaran 1 m3 Beton Bertulang menggunakan jack hammer

Pekerja oh 1.2000 185,674.16 222,808.99


Tenaga
Mandor oh 0.1200 218,291.00 26,194.92

Bahan BBM non subsidi ltr 2.5000 - -

Peralatan Jack Hammer sewa hari 0.2500 - -

Jumlah 249,003.91

Keuntungan Mak. 12% 24,900.39

Jumlah + Keuntungan 273,904.30

Dibulatkan 273,900.00

10 1 M3 Pembongkaran 1 m3 Beton Bertulang

Pekerja oh 13.3340 - -
Tenaga
Mandor oh 0.6660 218,291.00 145,381.81

Bahan BBM non subsidi ltr 2.5000 - -

Peralatan Jack Hammer sewa hari 0.2500 - -

Jumlah 145,381.81

Keuntungan Mak. 12% 14,538.18

Jumlah + Keuntungan 159,919.99

Dibulatkan 159,900.00

11 1 M3 Bongkar pasangan batu

Pekerja oh 0.6000 - -
Tenaga
Mandor oh 0.0600 218,291.00 13,097.46

Bahan BBM non subsidi ltr 2.5000 -

Peralatan Jack Hammer sewa hari 0.0500 - -

Jumlah 13,097.46

Keuntungan Mak. 12% 1,309.75

Jumlah + Keuntungan 14,407.21

Dibulatkan 14,400.00

12 1 M2 Pemasangan kaca tebal 5mm

Pekerja oh 0.0150 - -

Tukang kayu oh 0.1500 189,845.00 28,476.75


Tenaga
Kepala Tukang oh 0.0150 206,315.00 3,094.73

Mandor oh 0.0008 218,291.00 174.63

Bahan Kaca tebal 5mm m2 1.1000 - -

sealant kg 0.0500 - -

Jumlah 31,746.11

Keuntungan Mak. 12% 3,174.61

Jumlah + Keuntungan 34,920.72

Dibulatkan 34,900.00

Analisa Struktur Arsitektur Page 167


HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

13 1 M2 Pelaburan bidang kayu dengan politur

Pekerja oh 0.0400 - -

Tukang kayu oh 0.0600 189,845.00 11,390.70


Tenaga
Kepala Tukang oh 0.0160 206,315.00 3,301.04

Mandor oh 0.0030 218,291.00 654.87

Politur l 0.1500 - -

Bahan Politur Jadi l 0.3720 - -

Ampelas lbr 2.0000 - -

Jumlah 15,346.61

Keuntungan Mak. 15% 1,534.66

Jumlah + Keuntungan 16,881.27

Dibulatkan 16,800.00

14 1 M2 Pengecatan bidang kayu /Cat Minyak (1 lapis Plamuur, 1 lapis cat dasar, 2 lapis cat penutup)

Pekerja oh 0.0700 - -

Tukang cat oh 0.0090 - -


Tenaga
Kepala Tukang oh 0.0060 - -

Mandor oh 0.0030 - -

Cat menie kg 0.2000 - -

Plamur kg 0.1500 - -
Bahan
Cat dasar kg 0.1700 - -

Cat penutup kg 0.2600 - -

Jumlah -

Keuntungan Mak. 15% -

Jumlah + Keuntungan -

Dibulatkan -

Pekerjaan Listrik

1 1 Titik Pekerjaan Pemasangan Titik Lampu

Kabel Eterna NYM 3x2,5 m 15.000 9,113.70 136,705.50

Pipa Conduit btg 3.000 - -

Mangkok/ lampu bh 1.000 32,625.00 32,625.00

Tee Doos bh 3.000 - -

Bahan Klem Pipa bh 24.000 - -

L Bow bh 4.000 - -

Las Doop bh 3.000 - -

Saklar bh 1.000 - -

Fitting bh 1.000 - -

Upah ls 100% 32,625.00 32,625.00

Jumlah 201,955.50

Keuntungan Mak. 12% 20,195.55

Jumlah + Keuntungan 222,151.05

Dibulatkan 222,100.00

2 1 Titik Pekerjaan Pemasangan Stop Kontak

Kabel Eterna NYM 3x2,5 m 10.000 9,113.70 91,137.00

Pipa Conduit btg 3.000 6,980.00 20,940.00

Socket Pipa bh 1.000 5,000.00 5,000.00

Tee Doos bh 2.000 700.00 1,400.00

Bahan Klem Pipa bh 3.000 350.00 1,050.00

Analisa Struktur Arsitektur Page 168


HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
Bahan ( Rp ) ( Rp )

Fhiser bh 4.000 700.00 2,800.00

Las Doop bh 2.000 205.00 410.00

Stopkontak broco bh 1.000 - -

Isolasi bh 0.250 2,000.00 500.00

Upah oh 100% 54,339.00 54,339.00

Tenaga

Jumlah 177,576.00

Keuntungan Mak. 12% 17,757.60

Jumlah + Keuntungan 195,333.60

Dibulatkan 195,300.00

2 1 Titik Pekerjaan Pemasangan Stop Kontak AC

Kabel Eterna NYM 3x4 m 4.000 9,113.70 36,454.80

Pipa Conduit m 4.000 6,980.00 27,920.00

Socket Pipa bh 1.000 5,000.00 5,000.00

Tee Doos bh 2.000 700.00 1,400.00

Bahan Klem Pipa bh 3.000 350.00 1,050.00

Fhiser bh 4.000 700.00 2,800.00

Las Doop bh 2.000 205.00 410.00

Stopkontak AC broco bh 1.000 - -

Isolasi bh 0.250 2,000.00 500.00

Upah oh 50% 75,534.80 37,767.40

Tenaga - -

- -

Jumlah 113,302.20

Keuntungan Mak. 12% 11,330.22

Jumlah + Keuntungan 124,632.42

Dibulatkan 124,600.00

3 1 Titik Pekerjaan Pemasangan Saklar Tunggal

Saklar Tunggal 2Way 10A/Panasonic bh 1.000 10,980.00 10,980.00


Bahan
Klem Pipa m 1.000 350.00 350.00

Kabel m 12.000 9,113.70 109,364.40

Tenaga upah oh 100% 120,694.40 120,694.40

- -

Jumlah 241,388.80

Keuntungan Mak. 12% 24,138.88

Jumlah + Keuntungan 265,527.68

Dibulatkan 265,500.00

4 1 Titik Pekerjaan Pemasangan Saklar Ganda

Saklar Tunggal 2Way 10A/Panasonic m 1.000 - -


Bahan
Klem Pipa m 1.000 350.00 350.00

Kabel m 10.000 15,500.00 155,000.00

Tenaga upah oh 100% 155,350.00 155,350.00

- -

Jumlah 310,700.00

Keuntungan Mak. 12% 31,070.00

Jumlah + Keuntungan 341,770.00

Dibulatkan 341,700.00

Analisa Struktur Arsitektur Page 169


HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

4 1 Buah MCB

Pipa Listrik 5/8 btg 3.000 - -

Kabel m 12.000 9,113.70 109,364.40

T Dus bh 1.000 - -
Bahan
L Bow bh 2.000 - -

Klem Biasa bh 24.000 - -

MCB bh 1.000 35,200.00 35,200.00

Upah ls 100% 44,313.70 44,313.70

Jumlah 188,878.10

Keuntungan Mak. 12% 18,887.81

Jumlah + Keuntungan 207,765.91

Dibulatkan 207,700.00

3 1 Pekerjaan Pemasangan sink Royal

Bahan Sink Royal SB 42K bh 1.000 540,000.00 540,000.00

upah,alat oh 10% 540,000.00 54,000.00

- -

Jumlah 594,000.00

Keuntungan Mak. 12% 59,400.00

Jumlah + Keuntungan 653,400.00

Dibulatkan 653,400.00

3 1 Pekerjaan Pemasangan kran agsa sink

Bahan kran angsa bh 1.000 47,000.00 47,000.00

upah,alat oh 10% 47,000.00 4,700.00

- -

Jumlah 51,700.00

Keuntungan Mak. 12% 5,170.00

Jumlah + Keuntungan 56,870.00

Dibulatkan 56,800.00

3 1 Pekerjaan Pemasangan toren air 1000l

Bahan Toren Air 1000L bh 1.000 1,050,000.00 1,050,000.00

upah,alat oh 20% 1,050,000.00 210,000.00

Jumlah 1,260,000.00

Keuntungan Mak. 12% 126,000.00

Jumlah + Keuntungan 1,386,000.00

Dibulatkan 1,386,000.00

3 1 kg Pekerjaan Tiang

Bahan Besi hollow 75x75x1,8mm kg 1.000 16,842.31 16,842.31

upah,alat ls 30% 16,842.31 5,052.69

Jumlah 21,895.01

Keuntungan Mak. 12% 2,189.50

Jumlah + Keuntungan 24,084.51

Dibulatkan 24,000.00

3 1 kg Pekerjaan Balok

Bahan Besi hollow 75x75x1,8mm kg 1.000 16,842.31 16,842.31

upah,alat ls 30% 16,842.31 5,052.69

Analisa Struktur Arsitektur Page 170


HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

Jumlah 21,895.01

Keuntungan Mak. 12% 2,189.50

Jumlah + Keuntungan 24,084.51

Dibulatkan 24,000.00

3 1 kg Pekerjaan Pipa Besi Hitam

Bahan Pipa Besi Hitam 2" T=1.7mm kg 1.000 16,940.70 16,940.70

upah,alat ls 30% 16,940.70 5,082.21

Jumlah 22,022.91

Keuntungan Mak. 12% 2,202.29

Jumlah + Keuntungan 24,225.20

Dibulatkan 24,200.00

3 1 kg Pekerjaan Gording

Bahan Pipa Besi Hitam 1,5" T=1.4mm kg 1.000 18,006.61 18,006.61

upah,alat ls 30% 18,006.61 5,401.98

Jumlah 23,408.59

Keuntungan Mak. 12% 2,340.86

Jumlah + Keuntungan 25,749.45

Dibulatkan 25,700.00

3 1 m2 Pekerjaan Rolling Door

Bahan Rolling Door Galvalume m2 1.000 350,000.00 350,000.00

upah,alat ls 15% 350,000.00 52,500.00

Jumlah 402,500.00

Keuntungan Mak. 12% 40,250.00

Jumlah + Keuntungan 442,750.00

Dibulatkan 442,700.00

3 1 unit Pekerjaan Menara Air

Bahan Rangka Menara air m 3.000 800,000.00 2,400,000.00

upah,alat ls 30% 2,400,000.00 720,000.00

Jumlah 3,120,000.00

Keuntungan Mak. 12% 312,000.00

Jumlah + Keuntungan 3,432,000.00

Dibulatkan 3,432,000.00

3 1 unit Pekerjaan Box MCB

Bahan Box MCB 2 group bh 1.000 77,000.00 77,000.00

upah,alat ls 100% 77,000.00 77,000.00

Jumlah 154,000.00

Keuntungan Mak. 12% 15,400.00

Jumlah + Keuntungan 169,400.00

Dibulatkan 169,400.00

3 1 m Pekerjaan kabel

Analisa Struktur Arsitektur Page 171


HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJA BANGUNAN SAT INDEKS
( Rp ) ( Rp )

Bahan Kabel NYM 3x2,5 m 1.000 9,113.70 9,113.70

upah,alat ls 100% 9,113.70 9,113.70

Jumlah 18,227.40

Keuntungan Mak. 12% 1,822.74

Jumlah + Keuntungan 20,050.14

Dibulatkan 20,000.00

Analisa Struktur Arsitektur Page 172


HARGA SATUAN MATERIAL / BAHAN

-
-
-
-
0

NO SATUAN

NO BAHAN/MATERIAL SAT JUMLAH HARGA


A. MATERIAL DASAR
###
1 Batu kali m3 245,000.00
2 Macadam 5 - 7 cm m3 190,000.00
3 Split 2 - 3 cm m3 245,000.00
4 Tanah timbunan/tanah urug m3 150,000.00
5 Sirtu m3 210,000.00
6 Pasir timbunan / pasir urug m3 225,000.00
7 Pasir pasangan m3 235,000.00
8 Pasir beton m3 280,000.00
9 Semen PC Merah Putih kg 1,040.00
10 Semen warna kg 12,500.00
11 Batu bata bh 400.00
12 Dunia Mortar (DM-932) Perekat Bata Ringan kg 1,462.50
13 Dunia Mortar (DM-201) Plesteran Bata Ringan kg 970.00
14 Dunia Mortar (DM-208) Acian Bata Ringan kg 1,737.50
15 Bata putih / Hebel Tebal 7 cm (m3= 117 pcs) m3 4,460.94
16 Bata putih / Hebel Tebal 10 cm (m3=83 pcs) m3 547,515.00
17 Tiang pancang segiempat uk. 25x25 cm m' 155,000.00
18 - m2
19 GRASS BLOK Master Block 30 x 6 x 22 x 6 bh 18,000.00
20 GRASS BLOK Master Platinum 30 x 6 x 22 x 8 bh 20,000.00
21 Conblock 4 Internusa Merah / Kuning / Hitam / Klasik 10,5 cm x 21 x 8 m2 139,000.00
22 Paving block 6 cm Mutu K400 m2 125,000.00
23 Paving block 8 cm Mutu K400 m2 140,000.00
24 Cansteen 15.30.40 Mutu K350 bh 52,000.00
25 TRU PAVE Master Platinum 21 x 10,5 x 6 m2 121,000.00
26 Paving Block 21 x 10,5 x 8 m2 95,000.00
27 Abu Batu/Screening 5 mm m3 175,000.00
28 Buis beton ukuran 1/2 Ø 30 cm bh 70,000.00
29 Buis beton ukuran 1/2 Ø 40 cm bh 85,000.00
30 Buis beton ukuran 1/2 Ø 50 cm bh 130,000.00

HGR MATERIAL DAN UPAH Page 173


31 Buis beton Ø40 cm t = 100 cm bh 100,000.00
32 Buis beton Ø100 cm bh 255,000.00
33 Buis beton Ø120 cm bh 285,000.00
34 Buis beton Ø130 cm bh 305,000.00
35 Saluran U-Ditch 40x40 m1 475,000.00
36 Saluran U-Ditch 50x50 m1 520,000.00
37 Saluran U-Ditch 60x60 m1 712,500.00
38 Saluran U-Ditch 80x100 m1 1,235,000.00
39 Saluran U-Ditch 100x100 m1 1,812,500.00
40 Box Culvert 40/40 m1 875,000.00
41 Box Culvert 50/50 m1 1,187,000.00
42 Box Curvert 60/60 m1 1,437,500.00
43 Box Curvert 80/80 m1 2,250,000.00
44 Box Curvert 100/100 m1 3,100,000.00
45 Box Curvert 140/140 m1 4,229,000.00
46 Cover U-Ditch 400x60 LD m1 153,000.00
47 Cover U-Ditch 500x60 LD m1 208,000.00
48 Cover U-Ditch 600x60 LD m1 278,000.00
49 Cover U-Ditch 800x60 LD m1 379,000.00
50 Cover U-Ditch 1000x60 LD m1 535,000.00
51 Ready mix K 350 m3 860,000.00
52 Ready mix K 300 m3 -
53 Ready mix K 250 m3 -
54 Ready mix K 225 m3 800,000.00
55 Ready mix K 175 m3 815,000.00
56 Pengeras beton ltr 65,000.00
57 Sewa pompa longbump m3 6,500,000.00
58 Air ltr 160.00

B. MATERIAL KAYU
1 Papan kayu kls I m3 9,500,000.00
2 Balok kayu kls I m3 8,500,000.00
3 Papan kayu kls II m3 9,000,000.00
4 Balok kayu kls II m3 8,000,000.00
5 Papan kayu kls III Papan Borneo 3x20x400cm m3 1,890,000.00
6 Balok kayu kls III Balok Kayu Meranti Uk 8/12 x 400 m3 1,800,000.00
7 Kaso 5/7 Borneo m3 1,562,400.00
8 Balok 5/10 Mahoni m3 1,450,000.00
9 Dolken kayu Ø 8-10/4 meter Btg 15,000.00
C. MATERIAL BESI/BAJA
1 Besi beton polos Kg 8,714.95
Ø 12 btg 93,250.00
Kg 8,716.22

HGR MATERIAL DAN UPAH Page 174


Ø 10 btg 64,500.00
Kg 8,755.27
Ø 8 btg 41,500.00

2 Besi beton ulir Kg 8,817.57


Ø 10 btg 65,250.00
Kg 8,840.00
Ø 13 btg 110,500.00
Kg 8,815.79
Ø 16 btg 167,500.00

3 Kawat beton Kg 17,500.00


4 Besi Plat Kg 20,000.00
5 Besi streep Kg 18,000.00
6 Besi siku Kg 6,700.00
7 Besi baja canal C. Kg 7,500.00
8 Besi profil I.WF. kg 15,500.00
9 Pipa Black Stell dia. 4" T. 1,2 mm m' 1,519,999.00
10 Pipa Black Stell dia. 3" T. 1,2 mm m' 1,069,000.00
11 Pipa Black Stell dia. 2,5" T. 1,2 mm m' 820,000.00
12 Besi kotak 2X3 cm m2
13 Hollow galvanies 100X40X1.3 mm btg
14 Hollow galvanies 40X60X1.3 mm btg
15 Hollow galvanies 40X40X1.3 mm btg 135,000.00
16 Hollow galvanies 40X20X1.3 mm btg 130,000.00
17 Hollow galvanis 40X40X0,35 mm btg 76,000.00
18 Hollow galvanis 40X20X0,35 mm btg 65,000.00
19 Hollow 40X20X2 mm m' 36,666.67
20 Hollow 40X40X2 mm m' 50,616.67
21 Hollow 60X40X2 mm m' 63,616.67
22 Angkur baut dia. 16 mm bh 40,000.00
23 Wiremesh UM 10 dia. 10 mm lmbr 840,000.00
24 Besi angkur baut dia. Ø 16 cm bh 40,000.00
25 Mur baut HTB dia. Ø 16 cm bh 12,000.00
26 Plat stainless T. 5 mm P. 1.1 m bh
27 Pipa stainless ø 2,5" m'
28 Pipa Stainless Steel dia 1,5", t = 0,8 mm m' 38,500.00
29 Pipa Stainless Steel dia 2,5", t = 2 mm m' 133,666.67
30 Pipa Stainless Steel dia 1", t = 2 mm m' 52,500.00
31 Plat stainless T. 2 mm , 100x200 lbr
32 Besi Angkur baut dia. Ø 22 cm bh
33 Besi Angkur baut dia. Ø 19 cm bh
34 Besi Angkur baut dia. Ø 16 cm bh
35 Mur baut HTB dia. Ø 16 cm bh

HGR MATERIAL DAN UPAH Page 175


36 Mur baut HTB dia. Ø 19 cm bh
37 Jasa Pengelasan (Penyambungan tiap 12 m') bh
38 Kawat Las Nikko Steel NSN 308, 2 mm kg 124,000.00
39 Frame Alluminium kg 200,000.00

D. MATERIAL PAKU/SKRUP
1 Paku biasa kg 16,300.00
2 Paku beton bj 3,000.00
3 Paku payung berulir kg 28,000.00
4 Sekrup Gypsum Sunray 6x2 Per Buah bh 200.00
5 Self Drilling Screw dia 10 x 19 mm (Screw Truss) bh
6 Paku skrup kg 32,000.00
7 skrup piser bj 1,100.00
8 Paku mesiu dan peluru bj 1,400.00
E. MATERIAL FINISHING LANTAI DAN DINDING
1 Granit alam warna gelap/terang m2 3,300,000.00
2 Lantai homogenius tile 60X60 cm polished bh 55,625.00
3 Lantai homogenius tile 60X60 cm unpolished bh 56,250.00
4 Lantai homogenius tile 40X40 cm polished m2 347,500.00
5 Lantai homogenius tile 40X40 cm unpolished m2 317,800.00
6 Lantai homogenius tile 30X30 cm polished m2 265,000.00
7 Lantai homogenius tile 30X30 cm unpolished m2 136,000.00
8 Lantai homogenius tile 30X60 cm polished m2 130,000.00
9 Lantai homogenius tile 25X60 cm unpolished m2 216,000.00
10 Keramik Lantai 60X60 cm KW. 1 m2 82,300.00
11 Keramik Lantai 40X40 cm KW. 1 m2 70,000.00
12 Keramik Lantai 30X30 cm KW. 1 m2 47,500.00
13 Keramik Lantai 20X20 cm KW. 1 m2 44,500.00
14 Keramik Dinding 20X25 cm KW. 1 m2 56,200.00
15 Keramik Border 5X60 cm KW. 1 bh 14,500.00
16 Plint Lantai Homogenius tile ukuran 10 x 60 cm bh 11,125.00
17 Keramik Lantai Roman 10 x 60 Step Nosing Per Bh bh 17,000.00
18 Plint Keramik Setara Roman ukuran 10 x 60 cm bh 17,000.00
19 Plint Ubin Granito ukuran 10x30 cm bh 15,000.00
20 Poles cristal granit m2
21 Grouting anti slip granit m'
22 Batu Tempel Hitam (Batu Kali) m2
23 Batu candi m2
24 Batu palimanan m2
25 Batu andhesit bakar m2
26 Batu alur andhesit m2
F. MATERIAL KACA DAN AKSESORIES
1 Kaca bening T .3 mm m2 65,000.00
2 Kaca bening T .5 mm m2 85,000.00

HGR MATERIAL DAN UPAH Page 176


3 Kaca buram T .5 mm m2 112,000.00
4 Kaca rayband T .5 mm m2 ###
5 Kaca polos T .6 mm m2 160,000.00
6 Kaca rayband T .6 mm m2 125,000.00
7 Kaca Panashap Blue T. 6 mm m2
8 Kaca polos T .8 mm m2
9 Kaca rayband T .8 mm m2
10 Kaca polos T .10 mm m2
11 Kaca polos T .10 mm tempered m2 ###
12 Glass bord T .8 mm tempered 120 x 1,695 m2
13 Kaca polos T .12 mm m2
14 Kaca tempered T .12 mm m2 455,000.00
15 Kaca patri m2
16 Nako + bingkai (80x15) x 10 daun polos bh
17 Kaca es m2
18 Curtain wall m2
19 Lapisan Sandblast m2
20 Kaca cermin T. 5 mm beufel Uk. 80x100 cm bh ###
21 Kaca cermin T. 5 mm beufel Uk. 100x100 cm bh
22 Kaca Stopsol Reflective / Warna / warna T , 5 mm m2
23 Kaca Stopsol Reflective / Warna / warna T , 6 mm m2
24 Kaca Stopsol Reflective / Warna / warna T , 8 mm m2
25 Brite motoriced 96" MR 2424 Unit
26 Glass block 20x20 cm bh
G. MATERIAL ATAP
1 Seng plat BJLS 0,30 mm lbr 84,000.00
2 Seng gelombang BJLS 0,28 mm kk 53,000.00
3 Rangka atap kuda kuda baja ringan ( kasau dan reng) m2
4 Rangka atap kuda kuda baja ringan (kuda-kuda, gording, kasau dan reng) m2
5 Profil Baja Ringan Reng 32.45, T 0.45@ 6 m Merk biasa Per m' m' 6,983.33
6 Profil Baja Ringan Truss C-75.70 SNI , 0.70 @ 6m Merk DRB Per m' m' 17,833.33
7 Profil Baja Ringan Truss C-75.80 SNI , 0.8 @ 6m Merk Taso Per m' m' 21,583.33
8 Self Drilling Screw dia 8 x 38 mm HangChao bh 200.00
9 Dynabolt 12 mm bh 2,000.00
10 Air insulation type buble tebal 4 mm roll
11 Allumunium foil 2 muka m2
12 Glass woll m2
13 Atap metal Type Vendotti 0.3 mm m2
14 Bubungan atap metal model U T. 0.45 TCT m'
15 Atap Asphalt Bitumen CTI ex Korea m2
16 Atap Bitumen Setara Onduvilla (106 x 40) cm lbr 57,400.00
17 Safe Top Nail Onduline kg 120,000.00
18 Nok Onduline (warna Forest Green, Terracota, Classic Red) uk 100x50 cm m' 90,000.00
19 Speedy Screw Onduline bh 1,200.00

HGR MATERIAL DAN UPAH Page 177


19 Nok Atap Asphalt Bitumen IKO m'
20 Atap Genteng Keramik Kanmuri pcs
21 Bubungan atap Genteng Keramik Natural m'
22 Atap spandek T. 0.4 mm m2
23 Bubungan atap spandek T. 0.4 mm m'
24 Lisplank GRC T. 9 mm motif m'
25 LIST PLANK GRC Uk. 30 x 240 cm tebal 12 mm lbr 57,875.00
26 - m2
27 Ornamen Lisplank GRC T. 4 cm Motif custom m'
` 28 Talang Jurai 04 / 3 mm m

H. MATERIAL PINTU DAN ALUMINIUM


1 Profil Kusen alluminium 4" Powder Coating m' ###
2 Frame daun pintu Powder Coating m' 86,000.00
3 Frame daun jendela Powder Coating m' ###
4 Pintu Folding Door PVC Tipe N/Maxi/Solid m2 1,600,000.00
5 Kusen Alumunium Natural Ukuran 3 x 1 1/2 Alexindo m
6 Kusen Alumunium Natural Ukuran 4 x 1 3/4 Alexindo m 180,000.00
7 Kusen Alumunium Warna Ukuran 4 x 1 1/2 m
8
9
10
11
12 Aluminum composite panel, ukuran 122X244 cm m2 ###
13 Aluminium rangka ACP 40x20x2 m' ###
14 Aluminium 40x100 m'
15 Karet/Silent m' ###
16 Sealent m' 2,950.00
17 Pintu folding gate slat 0,4 mm m2
18 Sandbalsting m2
19 Text huruf stainless stell T. 0,4 mm cm
I. MATERIAL PLAFOND DAN PARTISI
1 Multiplek 3 mm (120x240) cm lbr 42,100.00
2 Multiplek 4 mm (120x240) cm lbr 51,300.00
3 Multiplek 6 mm (120x240) cm lbr 73,000.00
4 Multiplek 8mm (120x240) cm lbr 78,500.00
4 Multiplek 9 mm (120x240) cm lbr 81,000.00
5 Multiplek 12 mm (120x240) cm lbr 153,700.00
6 Taekwood 3 mm (120x240) cm lbr
7 Multiplek 18 mm (120x240) cm lbr 227,000.00
8 Megatek 3mm (120x240) cm lbr
9 HPL standar woodgrain (120X240) cm lbr

HGR MATERIAL DAN UPAH Page 178


10 Edging kayu 3mm (120x240) lbr
11 Gypsum board 9 mm (120x240) cm lbr 50,000.00
12 GRC / Versaboard 4.0 mm (1.20×2.40) lbr 51,500.00
13 ACP (Almunium Composite Panel) 125x488, 4mm lbr
14 Calsiboard 6 mm (120x240) cm lbr
15 Gyptile akustik 60X120X9 mm lbr
16 Plavon Pvc flat doof white,lebar 20cm,tebal 8 mm m2
17 List Plafon PVC m' 14,000.00
18 Spandrill Powder Coating m2
19 List plafond kayu T. 5 cm m' 27,000.00
20 List plafond gypsumb T. 10 cm m' 6,500.00
21 Main tee m'
22 Cross Tie m'
23 Rod gantung @1 m + Angle clip+M.Tee clip m'
24 Klem Penggantung Ke Beton bh 4,000.00
25 Kelm Penggantung ke plafond bh 3,000.00
26
27 Cornice adhesive/Kompon kg 2,800.00
28 Cattoon tape / Kasa Gypsum m' 900.00
J. MATERIAL PENGGANTUNG
1 Lockcase For Wood Door MTS IL 8485 SSS pcs 176,000.00
2 Lockcase For Wood Door MTS RL 8585 SSS set
3 CYL BC DL 60 mm set
4 ESCN D 13 SSS set
5 Handle Pintu Double PHD 268 P. 60 cm set
6 Handle Pintu LH SR 0137 SSS + PSS set
7 Handle Pintu Solid LHSR set
8 Handle cabinet Standar set
9 konci lemari 808 set
Kunci Pintu Solid set 125,000.00
10 Rel pintu HENDERSON S-6 PJ.2,4 MTR set 175,000.00
11 Rel laci 45 cm Doble FE- 45 /Doble Track set
12 Handle Pintu Standar set 185,000.00
13 Door Closer DCL 300 HO BA set 229,000.00
14 Door Stopper DS 886 SN set 18,000.00
15 Engsel pintu stainless stell s/s 3"x2,5"x2 mm 2 BB bh 32,500.00
16 Engsel pintu stainless stell s/s 4"x3"x2 mm 2 BB bh 40,000.00
17 Engsel Sendok huben bh
18 Floor Hinge FA 84 SSS set
19 Flush Bolt FB040 set
20 Casement stay CMT75-016"Brs set 25,000.00
21 Rabuncis 411 LH S set 18,000.00
22 Patch fitting bawah US10 pcs 700,000.00
23 Patch fitting atas PT20 pcs 985,000.00

HGR MATERIAL DAN UPAH Page 179


24 Grommet Plastik tutup lobang kabel dia,50mm pcs
25 Patch fitting bawah PSS10 pcs 650,000.00
26 Pintu folding gate slat 0,4 mm m2
Jendela nako (kerangka + kaca 5 mm) m1
Rantai dan Kunci Pengaman Rantai dan Kunci pengaman Valve 1 bh
Digital printing Bahan Spanduk m2 150,000.00

K. MATERIAL SANITER
1 Floordrain type TX1EB bh 303,000.00
2 Jet washer Type TB19CSNCR bh 984,000.00
3 Kitchenk zink stainless stell 1 lubang bh 299,000.00
4 Kloset duduk type SW660J bh 2,362,000.00
5 Kloset jongkok type CE6 bh 488,000.00
6 Kloset jongkok type CE7 bh 567,000.00
7 Kran dinding type T23B13 bh 225,000.00
8 Kran kitchenzink leher angsa bh 175,000.00
9 Partisi urinoir type AW115J bh 1,608,000.00
10 Tempat sabun TS125R bh 390,000.00
11 Tempat sabun TS126AR bh 199,000.00
12 Tissue holder type AW360J bh 458,000.00
13 Urinoir type U57M bh 1,250,000.00
14 Wastafel type L529V1 bh 544,000.00
15 Head Shower type TX446SESMBR bh 440,000.00
L. MATERIAL CAT
1 Cat tembok Exterior (Weathetsheild) Propan kg 88,166.67
Cat tembok eksterior (Weathersheild) setara Dulux ICI A922
2 Cat tembok interior Propan kg 28,958.33
3 Alkali Sealer kg 28,500.00
4 Cat besi setara glotek kg 59,400.00
5 Cat dasar Propan kg 58,800.00
6 Cat Gloss dulux v gloss kg ,
7 Meni kayu ltr 35,200.00
8 Meni besi ltr 50,000.00
9 Minyak cat ltr 94,050.00
10 Plamir tembok (Skim coat) Matex NP kg 14,225.00
11 Plamir kayu kg 48,000.00
12 Kertas amplas lbr 2,500.00
13 Dempul kayu Kg 67,980.00
14 Residu Ltr 8,000.00
15 Water profing coating eks Fosroc/SIKA Kg 29,000.00
16 - m2
17 Water profing Duo Compoite Membrane T. 3 mm m2 165,000.00
18 Woodstain kayu ltr

HGR MATERIAL DAN UPAH Page 180


19 Sending dasar kayu ltr
20 Cat melamik ltr
21 Thinner A Ltr
22 Zinkromat kg
23 Super thinnner Ltr
24 Lem kayu kg
25 lem Herperin kg
26 Kwas 3" bh
27 Roll cat ACE bh
28 Wall Paper, Setara Aneka Papera Indah, Kualitas Standar M²

M. MATERIAL LAIN - LAIN


1 Minyak solar Ltr
2 Minyak tanah Ltr
3 Minyak begesting Ltr 22,500.00
4 Oli pelumas Ltr
5 Calbon Ltr

N. SEWA PERALATAN

1 Excavator Jam 200,000.00


2 Dump Truck Jam
3 Buldoser Jam 170,000.00
4 Mesin Las Listrik Jam
5 Generator Set, 175 HP, Kap. 125 KVA Jam
6 Gondola Di Luar Standard Uk 600 X 65 X 100 Cm Bulan
7 Genset Kecil (1500 Watt) Hari
8 Crane 10-15 TON, 150 HP, Kap. 15 ton Jam
9 Flat Bed Truck 3-4 m³, 100 HP, Kap. 4 m³ Jam
10 Stamper 5HP, Kap. 0,17 ton Jam
11 Bar Bending Jam 250,000.00
12 Bar Cutter Jam 250,000.00
13 Concrete Mixer 0.3-0.6 M3 10.0 HP, 0.3 M Hari 340,000.00
14 ### Jam
15 ### Jam
16 Crane 10-15 TON 200.0 HP, 25.0Ton Jam
17 Drop Hammer TP 2 m'
18 Dump Truck 3-4 M3 120.0 HP, 4.0 Ton Jam
19 Hidraulic Jack TP 2 m'
20 Loading & Unloading m'
Bore Pile Machine 150.0 HP, 2,000 M m3

POHON

HGR MATERIAL DAN UPAH Page 181


1 Pupuk kompos ( Uk. Kecil ) krng 17,000.00
2 Rumput gajah mini m2 21,000.00
3 Palm Waregu T. 150 cm 5 s/d 7 btg/rpn rpn
4 The-tehan T. 50 cm 3 s/d 4 btg/rpn rpn
5 Ketapang laut T. 2 m dia. Batang 1,5 s/d 2 phn
6 Ketapang kencana T. 2 m dia batang 4 cm phn 140,000.00
7 Ketapang variegata T. 2 m dia. Batang 4 cm phn
8 Yangliu T. 150 - 200 dia. 3,5 cm phn
9 Kupu - kupu T. 1,5 - 2 m dia. Batang 3,5 cm phn
10 Pucuk merah T. 100 cm dia. Batang 3,5 cm phn 65,000.00
11 Alang - alang putih phn
12 Brokoli hijau phn
13 Brokoli kuning phn
14 Pohon mangga T. 2m phn
15 Palm Merah (Cyrtotachis Lakka) phn
16 Sabrina putih polybeck 12,000.00
17 Bakung tulip polybeck 10,000.00
18 Pisang pisangan (heliconia) polybeck 5,000.00

UPAH

1 Pekerja hari 75,000.00


2 Tukang Batu hari 100,000.00
3 Tukang Besi hari 125,000.00
4 Tukang Kayu hari 110,000.00
5 Tukang Cat hari 115,000.00
6 Kepala Tukang hari 135,000.00
7 Mandor Lapangan hari 150,000.00
8 Mekanik hari 120,000.00
9 Mekanik Pembantu hari 95,000.00

HGR MATERIAL DAN UPAH Page 182


BAHAN MATERIAL

KEGIATAN : JASA KONSULTANSI KONSULTAN PERENCANAAN (PLANNING)

REHAB TOTAL GEDUNG KANTOR LURAH PASAR MANGGIS

LOKASI : JL. MENTENG WADAS TIMUR KELURAHAN MANGGIS

KECAMATAN SETIABUDI JAKARTA SELATAN

TAHUN ANGGARAN : 2022

NO JENIS BAHAN BANGUNAN SAT HARGA

DOKUMENTASI
1 CD copy soft file foto image bh 1,950.00

2 Cetak foto lbr 1,200.00

3 Album foto bh 13,000.00

BATU PECAH
#REF! Sirtu urug/kerikil/koral m3 178,000.00

JENIS PASIR DAN TANAH


#REF! Pasir beton m3 290,429.00
Pasir pasang m3 235,000.00

PAS. BATA MERAH


PORTLAND CEMENT
1 Semen Merah Putih 50 kg kg 1,199.80

BAHAN KAYU
1 Kayu kamper samarinda 5x7x400 cm m3 6,000,000.00

BESI DAN KAWAT


1 Besi hollow SNI 20 mm x 40 mm x 0,3 mm, panjang/btg 4 m m1 7,125.00
2 Besi hollow SNI 40 mm x 40 mm x 0,3 mm, panjang/btg 4 m m1 8,750.00

BAHAN ATAP
1 Atap Spandek 600 mm tb 0,3 mm m2 49,000.00
2 Profil Baja Ringan Truss C-75.75 SNI , 0.75 m1 21,166.67
3 Profil Baja Ringan Truss C-75.65 SNI , 0.65 m1 18,666.67
4 Profil Baja Ringan Truss C-75.45 SNI , 0.45 m1 9,666.67
5 Genteng Keramik Mclas buah 8,800.00
6 Nok Genteng Keramik Mclas buah 24,000.00
7 Atap Asbes Gelombang 4mm (3x1.05) Djabesmen lbr 93,000.00

PAKU DAN IJUK


1 Paku 5 cm, 7 cm, 10cm kg 13,000.00
2 Paku gypsum kg 35,000.00
3 Paku sekrup kg 28,000.00

BAHAN LOTENG/PLAFOND
1 Tripleks tebal 12 mm (Papan Kayu Meranti) lbr 124,000.00
2 Triplek tebal 9 mm lbr 81,000.00
3 Plywood untuk pintu tebal 6 mm lbr 73,000.00
4 Gypsum 120 x 240 cm, t = 9 mm ex DN lbr 124,000.00
5 Gypsum tape roll 12,900.00
BAHAN KACA
1 Kaca polos tebal 5 mm Asahimas m2 114,000.00
2 Rangka Jendela Nako 8 daun buah 168,000.00

BAHAN PENGGANTUNG DAN KUNCI


1 Grendel tanam pintu standar set 60,000.00
CAT DAN BAHAN FINISHING
1 Cat Minyak EMCO kg 72,000.00
BIAYA SEWA ALAT
1 Dump Truck 7 m3 ritase 250,000.00
2 Pipa Conduit 20mm m1 2,326.67
3 Tee doos bh 700.00
4 Clem Pipa bh 350.00
5 Fshier bh 359.50
6 Lasdop bh 205.00

Harga Material Page 183


NO JENIS BAHAN BANGUNAN SAT HARGA

7 Isolasi Kabel 3M bh 6,500.00

8 Kabel NYM 3x2,5 Eterna m1 15,500.00


9 Lampu Essential 18 Watt Philips bh 34,000.00
10 Fitting Standard bh 7,000.00
11 Saklar 2 gang 2 way bh 23,298.00
12 saklar 1 gang 1 way bh 14,260.00
13 Sock pipa conduit bh 350.00
14 Stopkontak Panasonic bh 9,765.00

Harga Material Page 184


BAHAN MATERIAL

KETERANGAN

https://www.tokopedia.com/anugerahjayacctvkuningan/cd-blank-cd-kosong-cdr-gt-pro-flower?extParam=ivf%3Dfalse%26src%3Dsearch

https://www.tokopedia.com/esamfoto/cetak-foto-4r-paper-fuji-film?extParam=ivf%3Dfalse&src=topads

https://www.tokopedia.com/maysafotocopy/album-foto-4r-10x15-10-sheet-isi-40-foto-pink-the-flower?extParam=ivf%3Dfalse%26src%3Dsearch

https://www.tokopedia.com/rcmsupplier/batu-sirtu-pasir-dll

https://www.tokopedia.com/brik/pasir-putih-rangkas-per-m3?extParam=ivf%3Dfalse&src=topads

https://www.tokopedia.com/sinarolshopsos/semen-merah-putih-50kg-semen-mp?extParam=ivf%3Dfalse

https://www.tokopedia.com/borneokayu/kayu-kamper-samarinda-5x7x4-m?ref=wishlist

https://www.tokopedia.com/imsweet/hollow-hollo-galvalum-2x4-0-4-sni?extParam=ivf%3Dfalse%26src%3Dsearch
https://www.tokopedia.com/imsweet/hollow-hollo-galvalume-4x4-0-4-sni?extParam=ivf%3Dfalse%26src%3Dsearch

https://www.tokopedia.com/vvjayaaaaa/atap-spandex-zincalume-0-35-real-0-30-6-meter?extParam=ivf%3Dfalse&src=topads
https://www.tokopedia.com/galaxybajaoffici/baja-ringan-taso-c-0-75-taso-full-taso-0-75mm
https://www.tokopedia.com/galaxybajaoffici/baja-ringan-taso-0-65-mm-baja-ringan-taso-c75-x-35-x-0-65-mm
https://www.tokopedia.com/galaxybajaoffici/reng-taso-r32-x-0-45mm-baja-ringan-reng-taso-r32-x-0-45-mm
https://shopee.co.id/GENTENG-KERAMIK-GENTENG-M-CLASS-NATURAL-PROMO-i.284665368.8329682184?sp_atk=cda2e03d-c874-4d09-8da7-
e130f7110072&xptdk=cda2e03d-c874-4d09-8da7-e130f7110072
https://www.tokopedia.com/masteratap/nok-atas-genteng-keramik-kanmuri-warna-natural?extParam=ivf%3Dfalse%26src%3Dsearch&refined=true
https://shopee.co.id/ASBES-GELOMBANG-KECIL-merk-Djabesmen-1-8M-2-1M-2-4M-2-7M-3M-i.477751156.12757935146?sp_atk=ee962bc5-4d73-41a3-a9f8-
9dcb712752ec&xptdk=ee962bc5-4d73-41a3-a9f8-9dcb712752ec

https://www.tokopedia.com/go-hardware/paku-kayu-triplex-hanoman-4-10cm-per-1kg-1-kg?extParam=whid%3D8054742
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 277
https://www.tokopedia.com/infinitywars/paku-payung-7-cm-paku-seng-asbes-ulir-curah-3-inch-per-kg?extParam=ivf%3Dfalse%26src%3Dsearch

https://www.tokopedia.com/pabrisafetyshoes/triplek-12-mm-triplek-meranti-plywood-triplek-mc-triplek-uty?extParam=ivf%3Dfalse&src=topads
https://www.tokopedia.com/klopmart/triplek-cor-multiplek-9mm-mc-ukuran-4x8f-toleransi-1mm-termurah
https://www.tokopedia.com/klopmart/triplek-multiplek-mc-6mm-meranti-campur-ukuran-4x8f-termurah
https://www.tokopedia.com/depogypsum/kalsiboard-ling-6mm-1200-x-2400-kalsi-6-kalsiboard-6?extParam=ivf%3Dfalse%26src%3Dsearch
https://www.tokopedia.com/juraganperkakas/blitz-lakban-gypsum-5-cm-40-meter-lem-kasa-fiberglass-tape-perekat?extParam=ivf%3Dfalse%26src%3Dsearch

https://www.tokopedia.com/dutakaca/kaca-clear-polos-5mm-asahimas?extParam=ivf%3Dfalse%26src%3Dsearch
https://www.tokopedia.com/gretojaya/8-daun-bingkai-nako-jendela-kisi-besi-rangka-kaca-teralis-tralis-silver

https://www.tokopedia.com/pen88/grendel-tanam-grendel-pintu-slot-pintu-dobel-stainless?extParam=ivf%3Dfalse%26src%3Dsearch

https://www.tokopedia.com/akurjaya-tb/cat-minyak-emco-lux-111-red-brick-1kg?extParam=ivf%3Dfalse%26src%3Dsearch

https://www.tokopedia.com/jasabuangpuingjakarta/buang-puing-dan-sampah-proyek-duren-sawit?extParam=ivf%3Dfalse&src=topads
https://www.tokopedia.com/andalan-shop/pipa-conduit-polos-20mm-pipa-listrik-polos-20mm-pipa-polos?extParam=ivf%3Dfalse&src=topads
https://www.tokopedia.com/staride-shop/te-tee-t-dus-dos-doos-tdus-tdos-tdoos-cabang-3-way-c-3-hitam-kecil-5-8?extParam=ivf%3Dfalse%26src%3Dsearch
https://www.tokopedia.com/eghiegiatprima/clem-pipa-20mm?extParam=ivf%3Dfalse%26src%3Dsearch&refined=true
https://www.tokopedia.com/jirehautocare/fisher-sekrup-polystar-s5-s6-s8-s10-fiser-skrup-per-box-s10?extParam=ivf%3Dfalse&src=topads
https://www.tokopedia.com/bumisariprismatama/lasdop-titton-lasdop-listrik-electrical-connector-spring?extParam=ivf%3Dfalse%26src%3Dsearch

Harga Material Page 185


KETERANGAN

https://www.tokopedia.com/sumbermulialed/3m-isolasi-listrik-1258-jr-original-1258jr-hitam-tape-kabel-asli-ori?extParam=ivf%3Dfalse%26src%3Dsearch&refined=true

https://www.tokopedia.com/kenzie-gold/kabel-eterna-3x-2-5-mm-meteran-eceran-potongan-nym-kawat-tembaga?extParam=ivf%3Dfalse%26src%3Dsearch
https://www.tokopedia.com/andy-terus/lampu-philips-essential-18w-putih?extParam=ivf%3Dfalse%26src%3Dsearch
https://www.tokopedia.com/gka-elektrik/lampu-fitting-52201-panasonic-putih-e27?extParam=ivf%3Dfalse&src=topads
https://www.tokopedia.com/gudanglistrik/panasonic-saklar-seri-hotel-2g-2w-5532-wide-series-putih-2-gang-2-way
https://www.tokopedia.com/gudanglistrik/saklar-engkel-single-1gang-1way-wej5531-ws-panasonic
https://www.tokopedia.com/smabanceuy/soket-pipa-listrik-20mm-putih-pack-isi-100-pcs-sok-konduit-conduit?extParam=ivf%3Dfalse%26src%3Dsearch
https://www.tokopedia.com/tjelektrik/stop-kontak-panasonic-inbowtanam-flasimo-wcjp-1131?extParam=ivf%3Dfalse%26src%3Dsearch

Harga Material Page 186


BAHAN MATERIAL

KEGIATAN : JASA KONSULTANSI KONSULTAN PERENCANAAN (PLANNING)

REHAB TOTAL GEDUNG KANTOR LURAH PASAR MANGGIS

LOKASI : JL. MENTENG WADAS TIMUR KELURAHAN MANGGIS

KECAMATAN SETIABUDI JAKARTA SELATAN

TAHUN ANGGARAN : 2022

NO JENIS BAHAN BANGUNAN SAT HARGA

DOKUMENTASI
1 CD copy soft file foto image bh 2,200.00

2 Cetak foto lbr 1,500.00

3 Album foto bh 50,000.00


4 Banner flexy m2 18,000.00

BATU PECAH
1 Sirtu, kerikil, koral m3 -
2 Split 2/3 m3 -
3 Tanah Merah/ Tanah Urug m3 -
4 Batu kali belah m3 245,000.00

JENIS PASIR DAN TANAH


1 Pasir pasang/tras m3 235,000.00
2 Pasir beton m3 -
3 Pasir urug m3 225,000.00
4 Abu batu m3 -

PAS. BATA MERAH


1 Batu bata merah standar klas 1 bh 410.00
2 Bata ringan Hebel 10x20x60 cm 83 pcs m3 -
3 Bataco bekisting 40x19x9 cm bh 17,000.00
4 Bata Berongga bh 2,400.00

PORTLAND CEMENT
1 Semen Tiga Roda 50 kg kg 1,420.00
2 Semen putih/warna pasang lantai/dinding kg 11,800.00
3 Semen Grouting (25 kg) ex. Sikka grout zak 150,000.00
4 Semen MU-200 Acian beton 40 kg zak -
5 Semen MU-380 Perekat bata ringan 40 kg zak -
6 Semen MU-700 Pengeras & Pelicin beton 25 kg zak 150,000.00

BAHAN KAYU
1 Kayu Papan Kamper Medan m3 9,136,400.00
2 Kayu perancah/kayu kelas III ( kaso 5/7) real @ 1,250,000 m3 1,500,000.00
3 Dolken dia. 8 cm panjang 4 m real @ 11,500 btg 15,000.00
4 Kayu kamper samarinda, papan (oven) m3 15,313,000.00
5 Kayu kamper samarinda, balok (oven) m3 14,240,000.00
6 Kayu albasia m3 7,800,000.00
7 Bambu Ǿ 6-8/600 cm (bambu sedang) btg 33,000.00
8 Pintu kayu m2 700,000.00

BESI DAN KAWAT


1 Rata-rata U24 real @ 8,382/kg kg -
~ KS Cilegon SNI dia. 8 mm btg -
~ KS Cilegon SNI dia. 10 mm btg -
~ KS Cilegon SNI dia. 12 mm btg 109,000.00
~ KS Cilegon SNI dia, 13 mm btg -
~ KS Cilegon SNI dia. 16 mm btg -
2 Jaring kawat baja/wiremesh kg 9,710.00
~ M4 (2,1x5,4) m/lembar lbr 170,000.00
~ M5 (2,1x5,4) m/lembar lbr 250,000.00
~ M6 (2,1x5,4) m/lembar lbr 341,500.00
~ M7 (2,1x5,4) m/lembar lbr 476,500.00
~ M8 (2,1x5,4) m/lembar lbr 637,500.00
~ M9 (2,1x5,4) m/lembar lbr 750,000.00
~ M10 (2,1x5,4) m/lembar lbr 1,020,100.00
~ M12 (2,1x5,4) m/lembar lbr 1,183,000.00
3 Kawat pengikat/kawat beton kg 17,500.00
4 Kawat las kg -
5 Besi plat strip rata-rata kg 23,200.00
Harga Material Page 187
NO JENIS BAHAN BANGUNAN SAT HARGA

6 Besi hollow rata-rata 40 mm x 40 mm x 0,3 x 6000 mm m1 8,750.00


7 Besi hollow rata-rata 20 mm x 40 mm x 1,4 x 6000 mm m1 7,125.00

8 Besi stainless steel SS 304 dia. 2,5'' tb. 1,2 mm / btg 6 m btg 624,000.00

9 Besi stainless steel SS 304 dia. 2'' tb. 1,2 mm btg 498,000.00

10 Besi stainless steel SS 304 dia. 1,5'' tb. 1,2 mm btg -


11 Besi stainless steel SS 201 dia. 2'' tb. 1 mm m1 47,500.00
11 Plat stainless steel SS 304 tb. 1,2 mm m2 -
12 Besi hollow zinc 25 mm x 45 mm x 0,3 mm, panjang/btg 4 m m1 11,916.67
13 Besi hollow zinc 20 mm x 40 mm x 0,3 mm, panjang/btg 4 m m1 10,214.29
14 Besi hollow zinc 40 mm x 40 mm x 0,3 mm, panjang/btg 4 m m1 13,619.05
15 Harga rata-rata Profil kg 26,900.00
16 Pipa Hitam3" t=4 mm (P 6m/btg) m1 225,916.67
17 Pipa Medium Galvanis 3" t=4 mm (P 6m/btg) m1 183,166.67
18 Bondek 0,75mm L: 1000mm m2 150,000.00
0.16 83,000.00
518,750.00
BAHAN ATAP
1 Seng plat BJLS 0,4 mm 1,2x2,4 m lbr 300,300.00
2 Seng gelombang bjls 0,20 mm, 80x180 cm lbr 53,500.00
3 Seng plat bjls 0,40 mm, 1,20x2,40 cm lbr 300,300.00
4 Aluminium Composite Panel (ACP) tebal 4 mm m2 755,000.00
5 Pasangan rangka atap baja ringan m2 289,000.00
6 Atap Spandek 600 mm tb 0,3 mm m2 186,805.56
7 Nok/ alumunium m1 89,000.00
8 Sekrup/paku bh 1,200.00
9 GRC Lisplank Flat tebal 15 mm lebar 30 cm m1 75,000.00
10 Alumunium foil double side (1x50) m rol 445,000.00

PAKU DAN IJUK


1 Paku 7 cm (paku usuk kayu) kg -
2 Paku gypsum kg 35,000.00
3 Paku sekrup bh 300.00
4 Ramset/Dynabolt bh 15,000.00
5 Scrup gypsum kg 28,000.00

BAHAN PENUTUP LANTAI


1 Keramik Roman 20x20 cm polished m2 122,000.00
2 Keramik Lantai Roman 30x30 cm unpolished m2 103,600.00
3 Keramik Dinding Roman 30x60 cm polished m2 144,700.00
4 Keramik Lantai Roman 40x40 cm polished m2 126,000.00
5 Keramik Lantai Roman 60x60 cm polished m2 156,000.00
5 HT Granito 60x60, polished m2 -
6 HT Granito 40x40, polished m2 375,000.00
7 HT Granito 40x40, unpolished m2 271,000.00
8 HT Indogress Hitam 60x60 cm m2 364,000.00
9 Plint HT 10x60 Potongan dari HT 60x60 cm bh -
10 Step nossing HT 10 x 60 cm bergaris timbul bh -
11 Plint Keramik 10x30 Potongan dari Keramik 30x30 cm bh 4,823.33
12 Batu candi hitam m2 115,000.00

BAHAN LOTENG/PLAFOND
1 Tripleks tebal 9 mm lbr 81,000.00
2 Triplek tebal 8 mm lbr 100,000.00
3 Triplek tebal 4 mm lbr 75,000.00
4 Triplek tebal 12 mm lbr 124,000.00
4 Plywood untuk pintu tebal 4 mm lbr 166,000.00
5 Gypsum 120 x 240 cm, t = 9 mm ex DN lbr 105,000.00

6 Gypsum 120 x 240 cm, t = 12 mm ex DN lbr 148,320.00

7 Gypsum wet area (water resistant) lbr 126,240.00


uk. 120 x 240 cm, t = 9 mm ex DN
8 Gypsum tape roll 12,900.00
9 Papan Akustik uk. 60x60 tbl. 9 mm lbr 17,000.00
10 Papan Akustik uk. 60x120 tbl. 9 mm lbr 30,000.00
11 Profil aluminium "T" btg 1,000.00

12 Shadow line tebal 3 mm, panjang 3 m btg 16,200.00

13 GRC board uk. 2,4 m x 1,2 m, tbl = 4 mm lbr 75,000.00

14 Metal stud uk. 34x76 mm tbl. 0,40 mm btg 57,720.00

15 U runner uk. 25x76 mm tbl. 0,35 mm btg 52,080.00

List profil gypsum lebar 10 cm m1 6,500.00


16

Harga Material Page 188


NO JENIS BAHAN BANGUNAN SAT HARGA

17 List profil gypsum lebar 5 cm m1 10,000.00

18 List kayu kamper samarinda 1/15 cm m1 40,500.00


19 Rockwoll t=5 cm density 40 kg/m3 m2 43,000.00
20 Plafond PVC SUNDA PLAFOND lbr 66,330.00

BAHAN PLAT ALUMINIUM


1 Aluminium kusen 4" CA, Alexindo m1 70,166.67
2 Frame pintu 3" alumunium CA, Alexindo m1 130,900.00
3 Frame jendela 2" aluminium CA, Alexindo m1 125,800.00
4 Alumunium Composite Panel Seven t=4 mm (1220x2440 mm) lbr 755,000.00

BAHAN KACA
1 Kaca polos tebal 8 mm m2 233,300.00
2 Kaca laminated polos 8 mm (4+0,38+4) m2 426,017.50
3 Kaca polos tebal 3 mm m2 131,000.00
4 Kaca polos tebal 5 mm m2 114,000.00
5 Kaca tempered 10 mm m2 670,000.00
6 Kaca tempered 12 mm m2 843,000.00
7 Sealant/per tube bh/tube 10,000.00
8 Sealant/per m1 kg 56,250.00

9 Kaca backpanted tb. 8 mm m2 364,000.00

9 Kaca cermin 6 mm m2 275,000.00


10 Lis Karet Jendela m1 7,000.00

BAHAN PENGGANTUNG DAN KUNCI


1 Door closer dekson 40 kg set 295,000.00
2 Handle pintu stainless steel, HRE Griff psg 175,000.00
3 Kunci pitu swing (lockcase + cylinder) 70 mm Normal Nickel set 304,500.00
4 Kunci tanam pintu standar set 88,950.00
5 Floor hinges BTS 84/EN3/PSS, Dorma bh 1,875,000.00
6 Bottom pivot patch PT 10/PSS, Dorma bh 1,058,750.00
7 Top pivot patch PT 20/PSS, Dorma bh 1,058,750.00
8 Top pin PT 24-Silver, Dorma bh 458,750.00
9 Patch lock US 10/PSS, Dorma bh 1,755,000.00
10 Rumbuncis, Griff bh 10,000.00
11 Friction stay 8", Griff psg 129,600.00
12 Flush Bolt type 1613.12 SS psg 161,000.00
13 Engsel pintu 4" x 3"x 2 mm, Wall Bearing SS psg 42,700.00
14 Pull Handle SS H.30.30 L1200 mm psg 1,126,700.00
15 Pull Handle SS Bulat C.300.D.32 psg 527,100.00
16 Grendel Dekson set 45,000.00
17 engsel casmen dekson set 152,500.00
CAT DAN BAHAN FINISHING
1 Cat dinding dasar Jotun 20 kg kg 22,655.00
kg 4,531.00
2 Cat dinding interior Jotun 5 kg kg 50,000.00
kg 10,000.00
3 Cat dinding exterior Jotun (jotashields) 20 kg klg 99,250.00
kg 19,850.00
4 Cat dinding exterior TENOKOTE KG 45,000.00
4 Amplas standar lbr 6,000.00
5 Kuas rol besar bh 30,000.00

6 Sika Top Seal A+B, 25 kg zak 400,000.00

7 Meni kayu kg 28,000.00


8 Cat kayu Kansai Paint kg 45,500.00
Cat Kayu Avian Paint kg 68,000.00
9 Dempul duco (propan), 1,25 kg klg 55,000.00
10 Nippon 2000 kg 83,000.00
11 Lem putih fox kg 40,000.00
12 Lem Kuning FOX 1 kg kg 40,000.00
13 Lem fox kuning 2,5 kg kg 51,200.00
14 HPL Taco motif serat kayu tipe J/FC (uk. 122 cm x 244 cm) lbr 165,000.00
15 Kuas 4'' std bh 15,000.00
16 Solid surface tb. 8 mm m2 1,556,400.00
17 Wallpaper goodrich motif/warna uk. 0,5 m m2 45,000.00
18 Woodfiller kg 65,000.00
19 Woodstain ltr 70,000.00
20 Sending sealer ltr 65,000.00
21 Melamic top coat ltr 45,000.00
22 Soda api kg 25,000.00
23 Cumoir Waterproofing Coating kg 78,100.00
24 Residu ltr 21,250.00
25 Solar Industri ltr 13,400.00
26 Minyak pelumas ltr 47,750.00

Harga Material Page 189


NO JENIS BAHAN BANGUNAN SAT HARGA

27 Politur kayu Propan ltr 72,000.00


28 Plamur kayu kg 37,500.00
29 Cat Minyak (Kayu) Ftalit kg 72,000.00
30 Plamir dinding kg 17,500.00
31 Cat penutup mural momilex kg 132,000.00

SANITARY
1 Closet Duduk, TOTO type CW 705 ENJ bh 5,474,000.00
2 Closed Jongkok Flush, TOTO CE9 - TV150NSJ bh 3,130,000.00
3 Wastafel, TOTO type L529V1 bh 1,392,000.00
4 Urinoir, TOTO (U57M) bh 950,000.00
5 Jet washer, TOTO bh 325,000.00
6 Floor drain TX1BN bh 375,000.00
7 Kran wastafel, TOTO (TX109LH) bh 877,000.00
8 Kran dinding, TOTO (T23B13V7NB) bh 241,800.00
9 Kran dinding + shower, TOTO (TX423ST1) bh 627,000.00
10 Hand shower, TOTO (THX19B) bh 382,000.00
11 Tissue holder, TOTO (TX 720 ACRB) bh 355,000.00
12 Divider urinoir, TOTO (A 100) bh 1,550,000.00
13 Kitchen sink, TOTO Standart bh 750,000.00
14 Kran Kitchen, TOTO (TX 603KM) bh 520,000.00
15 Seal tape bh 7,500.00
16 Roof drain, San-Ei (H01) bh 170,000.00
17 Soap holder, TOTO (S156N) bh 136,000.00
18 Safety Grab Bar, TOTO (TX3A1) bh 668,000.00
19 Hand rail TX3A1 520,000.00
Closet Duduk, TOTO type CW 420J bh 2,295,000.00
SARANA DAN PRASARANA
1 Pipa stainless steel dia. 2'' tebal 1,2 mm (Panjang 6 m) m1 86,580.00
2 Pipa stainless steel dia. 2,5'' tebal 1,2 mm (Panjang 6 m) m1 108,810.00
3 U-ditch 30x40x120 cm, t=5 cm bh 474,300.00
4 Tutup U-ditct 40x60 cm bh 200,000.00
5 Buis beton penuh dia 100 cm p=0,5 m bh 468,200.00
6 Buis beton penuh dia. dalam 150 cm p=0,5 m bh 795,940.00
7 Paving block hexagon 8 cm m2 97,750.00
8 Kanstin DKI 14x30x40 K300 bh 58,000.00
9 Rumput gajah lempeng, mini 2 cm m2 25,000.00
10 Ijuk per ikat ikat 46,700.00
11 Tiang Pancang SQ 25x25 cm m1 185,000.00

BIAYA SEWA ALAT


1 Pompa Beton Standart >100 m3 m3 55,000.00
2 Dump Truck 3-4 m3, 100 HP, Kap. 6 T jam 200,000.00
3 Mobile Crane Kap. 35 T jam 341,300.00
4 Crane 10-15 TON, 150 HP, Kap. 15 ton jam 255,000.00
5 Hydrolic Jacked Pilling System jam 625,000.00
6 Mesin Las jam 59,375.00
7 Stamper hari 250,000.00
8 Concrete Vibrator m3 12,500.00
9 BBM non subsidi ltr 12,500.00
10 Jack Hammer hari 250,000.00
11 Molen kap. 0,3 m3 300,000.00

1 Kabel NYM 2x2,5 m1 12,000.00


2 Pipa konduit brg 6,980.00
3 Mangkok lampu bh 25,000.00
4 Tee doos bh 700.00
5 Clem Pipa bh 350.00
6 Fshier bh 359.50
7 Lasdop bh 205.00
8 Isolasi Kabel 3M bh 6,500.00
9 Kabel NYM 3x2,5 Eterna m1 15,500.00
10 Lampu Essential 18 Watt Philips bh 34,000.00
11 Fitting Standard bh 7,000.00
12 Saklar 2 gang 2 way bh 23,298.00
13 saklar 1 gang 1 way bh 14,260.00
14 Sock pipa conduit bh 350.00
15 Stopkontak Panasonic bh 9,765.00
16 L Bow bh 1,200.00
17 Kabel NYM 3x4 Eterna m1 25,000.00

18 Stop kontak bh 11,564.00

19 Stop kontak AC bh 29,700.00

MCB semua Amperw bh 24,000.00

Harga Material Page 190


NO JENIS BAHAN BANGUNAN SAT HARGA

Harga Material Page 191


BAHAN MATERIAL

KETERANGAN

http://tequillartcorporation.blogspot.co.id/p/daftar-harga-cetak-foto-digital-no.html

https://www.lazada.co.id/beli-album-foto/
https://www.tokopedia.com/darayagrafika/cetak-print-banner-spanduk-baliho-flexy-280gram

Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 260


https://www.tokopedia.com/rcmsupplier/batu-sirtu-pasir-dll
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 260
https://www.tokopedia.com/tjspasir/batu-belah-kualitas-terbaik?extParam=ivf%3Dfalse%26src%3Dsearch&refined=true

82111377070
https://www.tokopedia.com/madjutoko/pasir-cor-hitam-1engkel-3m3
https://www.tokopedia.com/gemilangpasir/pasir-urug-murni-bersih-muatan-6-5-kubik-free-ongkir-tangerang?src=topads
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 260

https://www.tokopedia.com/indopasirjaya/batu-bata-merah-free-ongkir?extParam=ivf%3Dfalse%26src%3Dsearch
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 261
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 261
https://www.tokopedia.com/rostermodern/bata-expose-bata-tanah-liat-bata-banting-batu-bata?extParam=ivf%3Dfalse&src=topads

https://www.tokopedia.com/tbtigabintang/semen-3-roda-tiga-roda-50-kg-50kg?extParam=ivf%3Dfalse%26src%3Dsearch
https://www.tokopedia.com/smarttools/am53-am-53-semen-nat-keramik-auker-nat-keramik-berbagai-warna-blue-aster?extParam=ivf%3Dfalse%26src%3Dsearch
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 263
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 263
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 263
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 263

Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 264


https://www.tokopedia.com/toko-terus-maju/kayu-dolken-ukuran-8-10-untuk-proyek?extParam=ivf%3Dfalse%26src%3Dsearch
https://www.tokopedia.com/toko-terus-maju/kayu-dolken-ukuran-8-10-untuk-proyek?extParam=ivf%3Dfalse%26src%3Dsearch
https://www.tokopedia.com/tokocitrakayu/kayu-kamper-samarinda-oven-super-3x20x400-cm-diserut?extParam=ivf%3Dfalse&src=topads
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 264
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 264
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 264
https://www.tokopedia.com/udmandirijaya/pintu-kayu-meranti

https://www.tokopedia.com/intikaryabindo/besi-beton-10-mm-polos-sni-harga-pabrik
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 267
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 267
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 267
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 267
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 267
Harga tertinggi dari ukuran M4 s/d M12 setelah dikonversi ke kg
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 265
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 265
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 265
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 265
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 265
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 265
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 265
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 265
https://www.tokopedia.com/sasteel/kawat-bendrat-kawat-beton-kawat-ikat-packing-20-kg
https://shopee.co.id/KAWAT-LAS-STAINLESS-NSN-308-NIKKO-STEEL-i.212421562.9608952609
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 266
Harga Material Page 192
KETERANGAN

https://www.tokopedia.com/imsweet/hollow-hollo-galvalume-4x4-0-4-sni?extParam=ivf%3Dfalse%26src%3Dsearch
https://www.tokopedia.com/imsweet/hollow-hollo-galvalum-2x4-0-4-sni?extParam=ivf%3Dfalse%26src%3Dsearch

http://duniabahanbangunanbandung.blogspot.co.id/p/harga-besi-pipa-stainless-steel.html

http://duniabahanbangunanbandung.blogspot.co.id/p/harga-besi-pipa-stainless-steel.html

konversi
https://www.tokopedia.com/bestcorner/pipa-2-x-1mtr-bulat-stainless-steel
konversi
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 269
Konversi
Konversi
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 266
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 268

http://www.agenbajaringan.com/bondek-floordeck.php

Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 270


https://www.tokopedia.com/tokobajaperkasa/seng-gelombang?extParam=ivf%3Dfalse%26src%3Dsearch
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 270
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 270
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 274
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 274
https://www.tokopedia.com/kaisarsteel/talang-juray-nok-atap-spandek-zincalume?whid=0
onduline

Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 275

https://www.tokopedia.com/go-hardware/paku-kayu-triplex-hanoman-3-7cm-per-1kg-1kg
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 277
https://www.tokopedia.com/infinitywars/paku-payung-7-cm-paku-seng-asbes-ulir-curah-3-inch-per-kg?extParam=ivf%3Dfalse%26src%3Dsearch
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 277
https://www.tokopedia.com/infinitywars/paku-payung-7-cm-paku-seng-asbes-ulir-curah-3-inch-per-kg?extParam=ivf%3Dfalse%26src%3Dsearch

Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 277


https://www.tokopedia.com/mjayakeramik/keramik-lantai-roman-dbatur-series-30x30-kw-1-g330510-perla
https://www.tokopedia.com/mjayakeramik/keramik-roman-dmarbella-w63334r-bruno-w63833r-winter-30x60-cm-kw1-w63833r-winter
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 277
https://www.tokopedia.com/mjayakeramik/roman-granit-dpozlana-light-gt602517r-dark-gt602518r-60x60-kw-1-gt602517r-ligh
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 280
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 280
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 280
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 280
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 280
https://www.tokopedia.com/granitmurah/list-granit-stepnose-10x60-rustic?extParam=ivf%3Dfalse%26src%3Dsearch
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 280
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 280

https://www.tokopedia.com/klopmart/triplek-cor-multiplek-9mm-mc-ukuran-4x8f-toleransi-1mm-termurah
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 281
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 281
https://www.tokopedia.com/pabrisafetyshoes/triplek-12-mm-triplek-meranti-plywood-triplek-mc-triplek-uty?extParam=ivf%3Dfalse&src=topads
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 282
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 282

http://www.liman.co.id/product-103-daftar-harga-rangka-partisi-metal-stud-track-.html
http://www.liman.co.id/product-94-daftar-harga-papan-gipsum-.html

https://www.tokopedia.com/juraganperkakas/blitz-lakban-gypsum-5-cm-40-meter-lem-kasa-fiberglass-tape-perekat?extParam=ivf%3Dfalse%26src%3Dsearch
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 282
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 282
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 282

https://www.tokopedia.com/jayagalvalum/tali-air-gypsum-shadowline-shadow-line-gypsum
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 282

http://www.liman.co.id/product-103-daftar-harga-rangka-partisi-metal-stud-track-.html

http://www.liman.co.id/product-103-daftar-harga-rangka-partisi-metal-stud-track-.html
https://www.tokopedia.com/alfianinterior/list-profil-gypsum-motif-piano-polos-lebar-10cm?extParam=ivf%3Dfalse

Harga Material Page 193


KETERANGAN

Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 282

Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 282


Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 282
https://www.tokopedia.com/juraganplafonpvc/shunda-plafon-pvc-serat-kayu-merah?extParam=ivf%3Dfalse&src=topads

https://www.tokopedia.com/arlindostore/alexindo-shop-front-kaca-mati-m-warna-coklat-4-x-1mm-x-6m-arlindo
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 276
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 276
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 276

Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 276


materialharga.com
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 276
https://www.tokopedia.com/dutakaca/kaca-clear-polos-5mm-asahimas?extParam=ivf%3Dfalse%26src%3Dsearch

https://www.tokopedia.com/anekabangunanjaya/lem-kaca-lem-silicon-sealant-tube-lem-aquarium-besar-85gram?extParam=ivf%3Dfalse%26src%3Dsearch
https://www.tokopedia.com/anekabangunanjaya/lem-kaca-lem-silicon-sealant-tube-lem-aquarium-besar-85gram?extParam=ivf%3Dfalse%26src%3Dsearch

https://www.alibaba.com/product-detail/6mm-back-painted-toughened-glass-for_1599292260.html?spm= a2700.7724838.2017115.10.63465754r7Iurz&s=p

Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 276

Provinsi DKI Jakarta Hal. 348


https://www.tokopedia.com/rajakuncisaniter/handle-pintu-roses-dekson-lhtr-0003-sss-handle-pintu-gagang-pintu?extParam=ivf%3Dfalse%26src%3Dsearch
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 297
https://www.tokopedia.com/sentrakaca/kunci-pintu-aluminium-dekkson-set-lockset-dekkson-kc-8123?extParam=ivf%3Dfalse&src=topads

https://www.tokopedia.com/gudang-gemilang/kunci-gagang-jendela-casement-handle-dekkson-ch-425-rambuncis-silver-kanan?extParam=ivf%3Dfalse&src=topads
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 297
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 297
https://www.tokopedia.com/sentrakaca/engsel-pintu-aluminium-dekkson-4-es-al-2005-4x3-5x3mm-original-hitam
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 297
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 297
https://www.tokopedia.com/goldenkeymk/door-bolt-dekson-grendel-slot-kunci-pintu-db-d002-3-inch-sss?extParam=ivf%3Dfalse%26src%3Dsearch
https://www.tokopedia.com/ellpro/engsel-casment-dekkson-stainless-steel-sus-304-ukuran-16-inchi-40cm?extParam=ivf%3Dfalse&src=topads

https://www.tokopedia.com/utamaindah1/cat-dasar-primer-untuk-tembok-jotaplast-jotun-warna-putih-25-kg?extParam=ivf%3Dfalse%26src%3Dsearch
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 300
https://www.tokopedia.com/utamaindah1/cat-tembok-interior-jotun-jotaplast-easy-majestic-sage-green-6013-majestictbmatt-840d
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 300
https://www.tokopedia.com/jotun-bekasi/cat-jotun-jotashield-af-20l-wilthshirecream?extParam=ivf%3Dfalse&src=topads
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 300
https://www.tokopedia.com/maggiohomecentre/cat-lapangan-tennokote-cat-garis-lapangan-tnk-1000wa-5kg-propan-reguler?extParam=ivf%3Dfalse%26src%3Dsearch&refined=true
https://www.tokopedia.com/cahayabangunan/amplas-ampelas-kertas-air-lembaran-kasar-halus-besi-kayu-motor-toho?extParam=ivf%3Dfalse%26src%3Dsearch&refined=true
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 301

https://www.tokopedia.com/teknikdanbanguna/sika-top-seal-107-25kg-komponen-a-komponen-b

https://www.tokopedia.com/exitointeres/loodmenie-meni-menie-kayu-cap-kampak-kapak-cat-kayu-orange-1-kg?extParam=ivf%3Dfalse%26src%3Dsearch
https://www.tokopedia.com/smj-bintaro/cat-minyak-menie-kansai-ftalit-primer-cat-dasar-zinc-chromate-1-kg-red-oxide-008?extParam=ivf%3Dfalse%26src%3Dsearch
https://www.tokopedia.com/cahayabarugroup/cat-avian-high-gloss-enamel-untuk-kayu-dan-besi-1-kg?extParam=ivf%3Dfalse%26src%3Dsearch
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 302
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 302
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 302
http://dataharga.blogspot.co.id/
https://www.tokopedia.com/tkcahayabaru/lem-kuning-fox-168-2-5kg-galon-kirim-gojek-grab?whid=0

Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 302

Jurnal edisi 38
https://www.builder.id/harga-cat-impra-2020/
https://www.builder.id/harga-cat-impra-2020/
https://www.builder.id/harga-cat-impra-2020/
https://www.rumahmaterial.com/2017/05/analisa-harga-satuan-finishing-melamik-kusen-pintu-kayu.html
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 302
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 302
https://www.tokopedia.com/kudamas8/estoform-ob-20-ltr-pail-minyak-bekisting-minyak-bekesting-murah?extParam=ivf%3Dfalse
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 302
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 302

Harga Material Page 194


KETERANGAN

https://www.tokopedia.com/cahayaajaya/cat-politur-pelapis-kayu-ultran-p-05-propan-ready-semua-warna-sollar-yellow?extParam=ivf%3Dfalse&src=topads
https://www.tokopedia.com/tokobesivip/dempul-plamur-kayu-cap-kucing?extParam=ivf%3Dfalse&src=topads
https://www.tokopedia.com/wandapaints/cat-ftalit-1-kg-cat-minyak-untuk-kayu-besi-ready-semua-warna?extParam=ivf%3Dfalse%26src%3Dsearch
https://www.tokopedia.com/msfits/nippon-plamir-matex-wallfiller-putty-4kg?extParam=ivf%3Dfalse&src=topads
https://www.tokopedia.com/smjdutamas/cat-tembok-mural-interior-mowilex-warna-cyanine-blue-bm-1002-1l?extParam=ivf%3Dfalse%26src%3Dsearch

https://www.tokopedia.com/lmjtoto/kloset-duduk-dengan-eco-washer-toto-cw705enj-tv150nsv5j-tcw07sv2?extParam=ivf%3Dfalse%26src%3Dsearch
https://www.tokopedia.com/300486/closet-toto-ce9-tv150nwv12j?extParam=ivf%3Dfalse%26src%3Dsearch&refined=true
https://www.tokopedia.com/atrumahku/paket-complete-wastafel-toto-l529v1?extParam=ivf%3Dfalse%26src%3Dsearch
https://www.tokopedia.com/300486/urinal-toto-u57m-complete-dutytipea?extParam=ivf%3Dfalse&src=topads
https://www.tokopedia.com/grandsanitary/shower-toilet-jet-shower-toto-stainless-thx-20mcrb?extParam=ivf%3Dfalse&src=topads
https://www.tokopedia.com/berkatsanitary/floor-drain-toto-baru-murah-tx1bn?extParam=ivf%3Dfalse&src=topads
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 303
https://www.tokopedia.com/atrumahku/kran-tembok-toto-t23b13v7nb?extParam=ivf%3Dfalse%26src%3Dsearch&refined=true
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 303
TOTO INDONESIA
TOTO INDONESIA
TOTO INDONESIA
https://www.tokopedia.com/saranajayautama/kitchen-sink-6045-paket-komplit?extParam=ivf%3Dfalse%26src%3Dsearch
https://www.tokopedia.com/primapanel/kran-dapur-toto-tx603km?extParam=ivf%3Dfalse&src=topads

https://www.tokopedia.com/muliabangunan90/roof-drain- san-ei-h01-4-inch
TOTO INDONESIA
TOTO INDONESIA
https://www.tokopedia.com/atrumahku/toto-tx3a1-grab-bar?extParam=ivf%3Dfalse%26src%3Dsearch
https://www.tokopedia.com/depopinangsia/kloset-toilet-toto-cw420j-with-eco-washer-1?extParam=ivf%3Dfalse%26src%3Dsearch

https://abadimetalutama.com/daftar-harga-pipa-stainless-steel/
https://abadimetalutama.com/daftar-harga-pipa-stainless-steel/
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 293
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 293
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 293
Konversi

Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 293


https://www.indotrading.com/product/rumput-gajah-mini-p87135.aspx
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 277
megaconbeton.com

Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 312


Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 312
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 312
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 312
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 312
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 312
https://www.tokopedia.com/anekasewajasa/sewa-stamper-kuda-cilandak-jakarta-selatan?extParam=ivf%3Dfalse%26src%3Dsearch
Jurnal Edisi 40 - 2021, Provinsi DKI Jakarta Hal. 312

https://www.tokopedia.com/rumahperkakas76/sewa-jack-hammer?extParam=ivf%3Dfalse%26src%3Dsearch

https://www.tokopedia.com/kenzie-gold/kabel-eterna-2x2-5mm-eceran-permeter-nym-kawat-tembaga
https://www.tokopedia.com/andalan-shop/pipa-conduit-polos-20mm-pipa-listrik-polos-20mm-pipa-polos?extParam=ivf%3Dfalse&src=topads
HPS
https://www.tokopedia.com/staride-shop/te-tee-t-dus-dos-doos-tdus-tdos-tdoos-cabang-3-way-c-3-hitam-kecil-5-8?extParam=ivf%3Dfalse%26src%3Dsearch
https://www.tokopedia.com/eghiegiatprima/clem-pipa-20mm?extParam=ivf%3Dfalse%26src%3Dsearch&refined=true
https://www.tokopedia.com/jirehautocare/fisher-sekrup-polystar-s5-s6-s8-s10-fiser-skrup-per-box-s10?extParam=ivf%3Dfalse&src=topads
https://www.tokopedia.com/bumisariprismatama/lasdop-titton-lasdop-listrik-electrical-connector-spring?extParam=ivf%3Dfalse%26src%3Dsearch
https://www.tokopedia.com/sumbermulialed/3m-isolasi-listrik-1258-jr-original-1258jr-hitam-tape-kabel-asli-ori?extParam=ivf%3Dfalse%26src%3Dsearch&refined=true
https://www.tokopedia.com/kenzie-gold/kabel-eterna-3x-2-5-mm-meteran-eceran-potongan-nym-kawat-tembaga?extParam=ivf%3Dfalse%26src%3Dsearch
https://www.tokopedia.com/andy-terus/lampu-philips-essential-18w-putih?extParam=ivf%3Dfalse%26src%3Dsearch
https://www.tokopedia.com/gka-elektrik/lampu-fitting-52201-panasonic-putih-e27?extParam=ivf%3Dfalse&src=topads
https://www.tokopedia.com/gudanglistrik/panasonic-saklar-seri-hotel-2g-2w-5532-wide-series-putih-2-gang-2-way
https://www.tokopedia.com/gudanglistrik/saklar-engkel-single-1gang-1way-wej5531-ws-panasonic
https://www.tokopedia.com/smabanceuy/soket-pipa-listrik-20mm-putih-pack-isi-100-pcs-sok-konduit-conduit?extParam=ivf%3Dfalse%26src%3Dsearch
https://www.tokopedia.com/tjelektrik/stop-kontak-panasonic-inbowtanam-flasimo-wcjp-1131?extParam=ivf%3Dfalse%26src%3Dsearch
https://www.tokopedia.com/camryjkt/elbow-knee-l-bow-20mm?extParam=ivf%3Dfalse%26src%3Dsearch
https://www.tokopedia.com/kenzie-gold/kabel-listrik-nym-eterna-3x4-putih

https://www.tokopedia.com/gudanglistrik/broco-stop-kontak-galleo-g151-55s-white-arde-socket

https://www.tokopedia.com/gudanglistrik/broco-stop-kontak-ac-galleo-g155-55s-white-socket-3p-3pin

https://www.tokopedia.com/ktsp/mcb-chint-nxb-1p-6ka-1a-2a-4a-6a-10a-16a-20a-25a-32a-40a-50a-63a-20a?extParam=ivf%3Dfalse

Harga Material Page 195


KETERANGAN

Harga Material Page 196


HARGA DASAR SATUAN BAHAN
Harga Satuan
No. Tenaga Kerja Satuan Keterangan
(Rp.)

1 Air Liter Rp. 100.00


2 Alluminium Foil DS m2 Rp. 16,000.00
3 Atap Aspal Bitumen CT3 Lembar Rp. 172,000.00
4 Underlayment Anti Bocor Atap m2 Rp. 64,000.00
5 Bambu Batang Rp. 123,000.00
6 Batu Bata Buah Rp. 700.00
7 Bata Ringan Tebal 7.5 cm Bh Rp. 9,000.00
8 Bata Ringan Tebal 10 cm Bh Rp. 12,000.00
9 Batu Kali / Batu Belah (Sungai / Gunung) M3 Rp. 185,000.00
10 Batang Kelapa Batang Rp. 307,500.00
11 Batu pecah 2-3 cm (1350 Kg/m3) M3 Rp. 330,000.00
12 Batu pecah 2-3 cm Kg Rp. 244.44
13 Batu Granit Kg Rp. 16,000.00
14 Batu Tempel Bh Rp. 16,500.00
15 Baut Kap Ø 1/2 - 8 Buah Rp. 5,535.00
16 Bensin (Industri) Liter Rp. 12,300.00
17 Besi Beton Polos Kg Rp. 12,000.00
18 Besi Beton Ulir Kg Rp. 14,000.00
19 Besi Hollow 40.40.2 mm m Rp. 22,000.00
20 Besi Profil Kg Rp. 16,700.00
21 Besi Siku L 30.30.3 Kg Rp. 12,500.00
22 Beton Rooster / Kerawang Buah Rp. 4,000.00
23 Bubungan Atap Aspal Bitumen M' Rp. 51,950.00
24 Cat Dasar Kg Rp. 28,000.00
25 Cat Kayu Mengkilat Kg Rp. 71,340.00
26 Cat Menie Kg Rp. 30,750.00
27 Cat Penutup Exterior Setara Jotun Kg Rp. 35,000.00
28 Cat Penutup Interior Setara Jotun Kg Rp. 65,000.00
29 Dempul Kg Rp. 30,750.00
30 Floor Drain Setara Toto Buah Rp. 280,000.00
31 Gypsum ( 120 x 240 cm ) Lembar Rp. 116,850.00
32 Gravel M3 Rp. 160,000.00
33 Granit Uk. 60 x 60 cm Polished Bh Rp. 86,400.00
34 Granit Uk. 60 x 60 cm Unpolished Bh Rp. 115,200.00
35 Granit Uk. 40 x 40 cm Bh Rp. 56,000.00
36 Granit Uk. 60 x 120 cm Bh Rp. 380,000.00
37 Ijuk Kg Rp. 12,300.00
38 Ijuk m3 Rp. 400,000.00
39 Kawat Beton Kg Rp. 22,000.00
40 Kawat Las Kg Rp. 18,700.00
41 Kayu Kelas I (Seumantok/Ulin/dll) M3 Rp. 6,765,000.00
42 Kayu Kelas II (Kamper/Kruing/dll) M3 Rp. 5,500,000.00
HARGA DASAR SATUAN BAHAN
Harga Satuan
No. Tenaga Kerja Satuan Keterangan
(Rp.)

43 Kayu Kelas III (Borneo/dll) M3 Rp. 4,500,000.00


44 Kayu Kelas IV (Sengon/dll) M3 Rp. 3,500,000.00
HARGA DASAR SATUAN BAHAN
Harga Satuan
No. Tenaga Kerja Satuan Keterangan
(Rp.)

45 Kayu Dolken Ø 8-10/400 cm Batang Rp. 17,000.00


46 Kayu 5 x 7, Kayu Kelas II M3 Rp. 6,765,000.00
47 Kayu Reng, Kayu Kelas II M3 Rp. 6,765,000.00
48 Keramik Uk. 20 x 20 cm (Polished) Bh Rp. 2,853.60
49 Keramik Uk. 30 x 30 cm (Polished) Bh Rp. 6,642.00
50 Keramik Uk. 33 x 33 cm (Polished) Bh Rp. 8,036.82
51 Keramik Uk. 40 x 40 cm (Polished) Bh Rp. 12,792.00
52 Keramik Uk. 20 x 20 cm (Unpolished) Bh Rp. 3,198.00
53 Keramik Uk. 30 x 30 cm (Unpolished) Bh Rp. 7,195.50
54 Keramik Uk. 33 x 33 cm (Unpolished) Bh Rp. 8,706.56
55 Keramik Uk. 40 x 40 cm (Unpolished) Bh Rp. 12,792.00
56 Kerosen / Minyak Tanah (Industri) Liter Rp. 15,375.00
57 Kerosen / Minyak Tanah (Subsidi) Liter Rp. 11,070.00
58 Kertas Amplas Lembar Rp. 6,150.00
59 Kerikil (1350 kg/m3) M3 Rp. 217,000.00
60 Kerikil Kg Rp. 160.74
61 Kloset Duduk Keramik Buah Rp. 3,280,000.00
62 Kloset Jongkok Keramik Buah Rp. 860,000.00
63 Koral Beton M3 Rp. 140,000.00
64 Kran Air Dia. 1/2" - 3/4" Bh Rp. 512,000.00
65 Minyak Cat Liter Rp. 30,000.00
66 Minyak Bekesting Liter Rp. 6,500.00
67 Minyak Pelumas Liter Rp. 12,400.00
68 Mortar Siap Pakai (MSP) Kg Rp. 6,000.00
69 Mortar Utama 380 ( 40 kg ) Zak Rp. 28,000.00
70 Multipleks 3 mm Lembar Rp. 55,350.00
71 Multipleks 4 mm Lembar Rp. 79,950.00
72 Multipleks 6 mm Lembar Rp. 104,550.00
73 Multipleks 9 mm Lembar Rp. 135,000.00
74 Paku Tripleks Kg Rp. 22,140.00
75 Paku Beton 8" Kotak Rp. 18,400.00
76 Paku Beton 4" Kotak Rp. 24,000.00
77 Paku 12 cm Bh Rp. 150.00
78 Paku Kayu 2" - 3" Kg Rp. 20,000.00
79 Paku Biasa 1/2" - 1" Kg Rp. 20,000.00
80 Paku Biasa 5 cm - 10 cm Kg Rp. 20,000.00
81 Paku Biasa 5 cm - 12 cm Kg Rp. 20,000.00
82 Paku Kayu Kg Rp. 20,000.00
83 Paku Reng Kg Rp. 15,498.00
84 Paku Seng Kg Rp. 18,450.00
85 Paku skrup 10 cm Kg Rp. 35,000.00
86 Papan Kayu Kelas I m3 Rp. 6,400,000.00
HARGA DASAR SATUAN BAHAN
Harga Satuan
No. Tenaga Kerja Satuan Keterangan
(Rp.)

87 Papan Kayu Kelas II m3 Rp. 5,500,000.00


88 Papan Kayu Kelas III m3 Rp. 4,000,000.00
89 Papan Kayu Plafond Kelas II m3 Rp. 5,640,000.00
90 Pasir Batu (Sirtu) M3 Rp. 280,000.00
91 Pasir Beton (1400 kg/m3) M3 Rp. 217,000.00
92 Pasir Beton Kg Rp. 155.00
93 Pasir Pasang (1400 kg/m3) M3 Rp. 217,000.00
94 Pasir Pasang Kg Rp. 155.00
95 Pasir Urug M3 Rp. 124,000.00
96 Paving Block M2 Rp. 98,400.00
97 Penjaga Jarak Bekesting (Spacer) bh Rp. 25,000.00
98 Pipa Leiding Ø 1" Galvanis Tebal 3.2 mm m' Rp. 50,225.00
99 Pipa Leiding Ø 3/4" Galvanis Tebal 3.2 mm m' Rp. 38,333.33
100 Pipa Leiding Ø 1/2" Galvanis Tebal 3.2 mm m' Rp. 30,750.00
101 Pipa Leiding Ø 1 1/2" Galvanis Tebal 3.2 mm m' Rp. 69,700.00
102 Pipa Leiding Ø 2" Galvanis Tebal 3.2 mm m' Rp. 88,150.00
103 Pipa Leiding Ø 3" Galvanis Tebal 3.2 mm m' Rp. 112,750.00
104 Pipa Leiding Ø 4" Galvanis Tebal 3.2 mm m' Rp. 176,300.00
105 Pipa Leiding Ø 6" Galvanis Tebal 3.2 mm m' Rp. 291,100.00
106 Pipa PVC Ø 1" m' Rp. 11,200.00
107 Pipa PVC Ø 1/2" Kualitas AWE (United) m' Rp. 6,300.00
108 Pipa PVC Ø 1 1/2" m' Rp. 19,500.00
109 Pipa PVC Ø 2" m' Rp. 25,000.00
110 Pipa PVC Ø 2 1/2" m' Rp. 36,500.00
111 Pipa PVC Ø 3" m' Rp. 50,000.00
112 Pipa PVC Ø 3/4" m' Rp. 8,300.00
113 Pipa PVC Ø 4" m' Rp. 66,000.00
114 Plamur Kg Rp. 22,000.00
115 Plint Keramik Granit 10 x 40 Bh Rp. 8,600.00
116 Plint Keramik Granit 10 x 60 Bh Rp. 12,800.00
117 Plywood 4 mm ( Ukuran 90 x 220 cm ) Lembar Rp. 78,000.00
118 Plywood 6 mm Lembar Rp. 86,000.00
119 Plywood 9 mm Lembar Rp. 135,000.00
120 Ramset Buah Rp. 350.00
121 Rangka Baja Ringan C75 kg Rp. 12,000.00
122 Rangka Baja Ringan C125 m' Rp. 122,000.00
123 Residu Kg Rp. 8,500.00
124 Roof Light Fibreglass 90 x 180 cm Lbr Rp. 260,000.00
125 Seal Tape Bh Rp. 3,500.00
126 Seng BJLS 0.20 Lbr Rp. 34,000.00
127 Semen @ 40 Kg Zak Rp. 58,000.00
128 Semen @ 40 Kg Kg Rp. 1,450.00
HARGA DASAR SATUAN BAHAN
Harga Satuan
No. Tenaga Kerja Satuan Keterangan
(Rp.)

129 Semen @ 50 Kg Zak Rp. 150,000.00


130 Semen @ 50 Kg Kg Rp. 3,000.00
131 Semen Warna @ 50 Kg Zak Rp. 150,000.00
132 Semen Warna @ 50 Kg Kg Rp. 3,000.00
HARGA DASAR SATUAN BAHAN
Harga Satuan
No. Tenaga Kerja Satuan Keterangan
(Rp.)

133 Sirap Kayu Bh Rp. 12,000.00


134 Skrup Fixer Bh Rp. 200.00
135 Solar (Industri) Liter Rp. 9,000.00
136 Stop Kontak + Instalasi Titik Rp. 73,800.00
137 Storox - 100 Kg Rp. 120,000.00
138 Stut Werk M3 Rp. 2,890,500.00
139 Tanah Liat M3 Rp. 40,000.00
140 Tanah Timbun M3 Rp. 70,000.00
141 Tanah Timbun Pilihan - Material Jalan M3 Rp. 140,000.00
142 Wastafel Bh Rp. 380,000.00
143 Waterdrain Bh Rp. 45,000.00
144 Waterstop PVC Lebar 150 mm m Rp. 24,500.00
145 Waterstop PVC Lebar 200 mm m Rp. 30,500.00
146 Waterstop Lebar 230 mm - 320 mm m Rp. 38,500.00
147 Wiremesh (Ulir) Dia. 5.0 Kg Rp. 10,000.00
148 Wiremesh (Ulir) Dia. 6.0 Kg Rp. 10,450.00
149 Besi Strip tebal 5 mm Kg Rp. 12,500.00
150 Seng Plat 3 x kk bjls 30 Lbr Rp. 84,000.00
150 Atap Apandek 0.30 mm M2 Rp. 70,000.00
151 Paku skrup + Mur bh Rp. 1,000.00
151
152
152
ANALISA HARGA SATUAN MEKANIKAL ELEKTRIKAL PLUMBING

Nama Kegiatan : -
Lokasi : -

HARGA MATERIAL UPAH ALAT BANTU TOTAL HARGA


NO. URAIAN Satuan
(Rp.) (Rp.) (Rp.) (Rp.)
1 2 3 4 5 6 7
LISTRIK ARUS KUAT
Kabel Listrik
56 Conduit m Rp 4,500.00 Rp 135.00 Rp 45.00 Rp 4,680.00
1 NYM 3 x 2.5 mm2 + Conduit m Rp 23,720.00 Rp 711.60 Rp 237.20 Rp 24,668.80
2 NYM 2 x 2.5 mm2 m Rp 14,760.00 Rp 442.80 Rp 147.60 Rp 15,350.40
3 NYM 3 x 2.5 mm2 m Rp 19,220.00 Rp 576.60 Rp 192.20 Rp 19,988.80
4 NYM 3 x 4 mm2 m Rp 27,500.00 Rp 825.00 Rp 275.00 Rp 28,600.00
5 NYY 1 x 95 mm2 m Rp 206,500.00 Rp 6,195.00 Rp 2,065.00 Rp 214,760.00
6 NYY 1 x 120 mm2 m Rp 259,000.00 Rp 7,770.00 Rp 2,590.00 Rp 269,360.00
7 NYY 1 x 50 mm2 m Rp 101,100.00 Rp 3,033.00 Rp 1,011.00 Rp 105,144.00
8 NYY 1 x 185 mm2 m Rp 396,000.00 Rp 11,880.00 Rp 3,960.00 Rp 411,840.00
9 NYY 1 x 240 mm2 m Rp 520,000.00 Rp 15,600.00 Rp 5,200.00 Rp 540,800.00
10 NYY 1 x 300 mm2 m Rp 650,000.00 Rp 19,500.00 Rp 6,500.00 Rp 676,000.00
11 NYY 1 x 400 mm2 m Rp 825,000.00 Rp 24,750.00 Rp 8,250.00 Rp 858,000.00
12 NYY 1 x 500 mm2 m Rp 1,055,000.00 Rp 31,650.00 Rp 10,550.00 Rp 1,097,200.00
9 NYY 3 x 1 x 185 mm2 m Rp - Rp - Rp -
10 NYY 3 x 2.5 mm2 m Rp 23,650.00 Rp 709.50 Rp 236.50 Rp 24,596.00
11 NYY 3 x 4 mm2 m Rp 36,300.00 Rp 1,089.00 Rp 363.00 Rp 37,752.00
12 NYY 3 x 6 mm2 m Rp 50,500.00 Rp 1,515.00 Rp 505.00 Rp 52,520.00
13 NYY 3 X 10 mm2 m Rp 82,000.00 Rp 2,460.00 Rp 820.00 Rp 85,280.00
14 NYY 4 x 2.5 mm2 m Rp 31,500.00 Rp 945.00 Rp 315.00 Rp 32,760.00
15 NYY 4 x 4 mm2 m Rp 47,300.00 Rp 1,419.00 Rp 473.00 Rp 49,192.00
16 NYY 4 x 6 mm2 m Rp 66,200.00 Rp 1,986.00 Rp 662.00 Rp 68,848.00
17 NYY 4 x 10 mm2 m Rp 105,600.00 Rp 3,168.00 Rp 1,056.00 Rp 109,824.00
18 NYY 4 x 16 mm2 m Rp 156,000.00 Rp 4,680.00 Rp 1,560.00 Rp 162,240.00
19 NYY 4 x 25 mm2 m Rp 239,500.00 Rp 7,185.00 Rp 2,395.00 Rp 249,080.00
20 NYY 4 x 35 mm2 m Rp 326,500.00 Rp 9,795.00 Rp 3,265.00 Rp 339,560.00
21 NYY 4 x 50 mm2 m Rp 433,000.00 Rp 12,990.00 Rp 4,330.00 Rp 450,320.00
22 NYY 4 x 70 mm2 m Rp 614,000.00 Rp 18,420.00 Rp 6,140.00 Rp 638,560.00
23 NYY 4 x 95 mm2 m Rp 845,000.00 Rp 25,350.00 Rp 8,450.00 Rp 878,800.00
24 NYY 4 x 120 mm2 m Rp 1,062,500.00 Rp 31,875.00 Rp 10,625.00 Rp 1,105,000.00
25 NYY 4 x 150 mm2 m Rp 1,307,500.00 Rp 39,225.00 Rp 13,075.00 Rp 1,359,800.00
26 NYY 4 x 185 mm2 m Rp 1,630,500.00 Rp 48,915.00 Rp 16,305.00 Rp 1,695,720.00
27 NYY 4 x 240 mm2 m Rp 2,147,500.00 Rp 64,425.00 Rp 21,475.00 Rp 2,233,400.00
28 NYY 4 x 300 mm2 m Rp 2,678,500.00 Rp 80,355.00 Rp 26,785.00 Rp 2,785,640.00
29 NYFGbY 3 x 2.5 mm2 m Rp 214,500.00 Rp 6,435.00 Rp 2,145.00 Rp 223,080.00
30 NYFGbY 3 x 4 mm2 m Rp - Rp - Rp -
31 NYFGbY 3 x 6 mm2 m Rp - Rp - Rp -
32 NYFGbY 3 x 10 mm2 m Rp - Rp - Rp -
33 NYFGbY 4 x 2.5 mm2 m Rp 285,000.00 Rp 8,550.00 Rp 2,850.00 Rp 296,400.00
34 NYFGbY 4 x 4 mm2 m Rp - Rp - Rp -
35 NYFGbY 4 x 6 mm2 m Rp - Rp - Rp -
36 NYFGbY 4 x10 mm2 m Rp - Rp - Rp -
37 NYFGbY 4 x16 mm2 m Rp - Rp - Rp -
38 NYFGbY 4 x25 mm2 m Rp - Rp - Rp -
39 NYFGbY 4 x35 mm2 m Rp - Rp - Rp -
40 NYFGbY 4 x50 mm2 m Rp - Rp - Rp -
41 NYFGbY 4 x70 mm2 m Rp - Rp - Rp -
42 NYFGbY 4 x 95 mm2 m Rp - Rp - Rp -
43 NYFGbY 4 x 120 mm2 m Rp - Rp - Rp -
44 NYFGbY 4 x 150 mm2 m Rp - Rp - Rp -
45 NYFGbY 4 x 185 mm2 m Rp - Rp - Rp -
46 NYFGbY 4 x 300 mm2 m Rp - Rp - Rp -
47 N2XSEFGby 3x185 mm2 m Rp - Rp - Rp -
48 N2XSY 1X95 mm2 m Rp - Rp - Rp -
49 BC 2.5 mm2 m Rp - Rp - Rp -
50 BC 4 mm2 m Rp - Rp - Rp -
51 BC 6 mm2 m Rp - Rp - Rp -
52 BC 10 mm2 m Rp - Rp - Rp -
53 BC 35 mm2 m Rp - Rp - Rp -
54 BC 2 x 35 mm2 m Rp - Rp - Rp -
55 FRC 4 x 4 mm2 m Rp - Rp - Rp -
56 FRC 4 x 6 mm2 m Rp - Rp - Rp -
57 FRC 4 x 10 mm2 m Rp - Rp - Rp -
58 FRC 4 x 16 mm2 m Rp - Rp - Rp -

Kabel Tray
55 Kabel ladder W400xH100 m Rp - Rp - Rp -
56 Kabel ladder W300xH100 m Rp - Rp - Rp -

ANALISA ME Page 203


57 Kabel Tray U W150xH50 m Rp - Rp - Rp -
58 Kabel Tray U W200xH50 m Rp - Rp - Rp -
59 Kabel Tray U W200xH100 dan aksesoris lainnya m Rp - Rp - Rp -
60 Kabel Tray U W300xH100 m Rp - Rp - Rp -
61 Elbow Kabel ladder W400xH100 m Rp - Rp - Rp -
62 Elbow Kabel Tray W200xH50 m Rp - Rp - Rp -
63 Elbow Kabel Tray W150xH50 m Rp - Rp - Rp -
64 Tee Kabel Tray W200xH50 m Rp - Rp - Rp -
65 Tee Kabel Tray W150xH50 m Rp - Rp - Rp -
66 Cross Kabel Tray W150xH50 m Rp - Rp - Rp -
67 Kabel Duck PVC m Rp - Rp - Rp -

Lampu & Stop Kontak


1 Pas. Titik instalasi lampu + PVC Conduit dia. 20 mm ttk Rp - Rp -
2 Pas. Titik instalasi stop kontak NYM 3x2,5 mm2 + PVC Conduit dia. 20 mm ttk Rp - Rp -
3 Pas. Lampu LED Tube 1 x 20 watt TKO bh Rp - Rp - Rp -
4 Pas. Lampu LED Tube 1 x 40 watt TKO bh Rp 40,000.00 Rp 1,200.00 Rp 400.00 Rp 41,600.00
5 Pas. Lampu LED Tube 2 x 20 watt TKO bh Rp 65,000.00 Rp 1,950.00 Rp 650.00 Rp 67,600.00
6 Pas. Lampu LED Tube 1 x 20 watt TKI bh Rp - Rp - Rp -
7 Pas. Lampu LED Tube 2 x 20 watt TKI bh Rp - Rp - Rp -
8 Pas. Lampu LED Tube 1 x 20 watt RM bh Rp - Rp - Rp -
9 Pas. Lampu LED Tube 2 x 20 watt RM bh Rp - Rp - Rp -
10 Pas. Lampu LED Down Light 7 Watt bh Rp - Rp - Rp -
11 Pas. Lampu LED Down Light 11 Watt bh Rp - Rp - Rp -
3 Pas. Lampu LED Down Light 14 Watt bh Rp 85,800.00 Rp 2,574.00 Rp 858.00 Rp 89,232.00
4 Pas. Lampu LED Down Light 18 Watt bh Rp - Rp - Rp -
5 Pas. Lampu LED Down Light Outbow 23 Watt bh Rp - Rp - Rp -
6 Pas. Lampu LED Baret SCB bh Rp - Rp - Rp -
7 Pas. Lampu LED Tuba Up Down bh Rp - Rp - Rp -
8 Pas. Lampu LED Tube 2 x 20 watt TKO bh Rp - Rp - Rp -
9 Pas. LED Industrial Light 70 Watt bh Rp - Rp - Rp -
10 Pas. Lampu Sorot LED Spot light 10/13 Watt bh Rp - Rp - Rp -
11 Pas. Lampu Sorot LED Flood light 70 Watt bh Rp - Rp - Rp -
12 Pas. Lampu LED STRIP SMD 5050 24W/5m + Remote m Rp - Rp - Rp -
13 Pas. Lampu EXIT bh Rp - Rp - Rp -
4 Pas. Saklar Ganda bh Rp 32,000.00 Rp 960.00 Rp 320.00 Rp 33,280.00
5 Pas. Saklar Tunggal bh Rp 20,000.00 Rp 600.00 Rp 200.00 Rp 20,800.00
6 Pas. Saklar Tukar bh Rp - Rp - Rp -
6 Pas. Stop Kontak bh Rp 18,000.00 Rp 540.00 Rp 180.00 Rp 18,720.00
7 Pas. Stop Kontak 2 lubang bh Rp 41,400.00 Rp 1,242.00 Rp 414.00 Rp 43,056.00
8 Pas. Stop Kontak Putar bh Rp - Rp - Rp -
7 Pas. Stop Kontak AC bh Rp 55,000.00 Rp 1,650.00 Rp 550.00 Rp 57,200.00
8 Pas. Stop Kontak Lantai bh Rp - Rp - Rp -
9 Pas. Stop Kontak 3 Phase bh Rp - Rp - Rp -
8 Pas. Lampu Mirror Louvre LED 2 x 20 watt bh Rp 171,000.00 Rp 5,130.00 Rp 1,710.00 Rp 177,840.00
9 Pas. Lampu Mirror Louvre LED 2 x 36 watt bh Rp - Rp - Rp -
10 Garden Lamp 18 Watt beserta kabel NYFGBY 4 mm2 unit Rp 364,000.00 Rp 364,000.00
11 Pemasangan lampu taman titik Rp 120,000.00 Rp 120,000.00
12 Lampu LED Underground waterproof 10 watt - 20 watt unit Rp - Rp - Rp -

Penangkal Petir
35 Penangkal Petir Elektrostatis EF 35 bh Rp - Rp - Rp -
36 Penangkal Petir Elektrostatis EF 60 bh Rp - Rp - Rp -
37 Penangkal Petir Elektrostatis EF 150 bh Rp - Rp - Rp -
38 Penangkal Petir Spitzen + Batang tiang bh Rp 75,000.00 Rp 2,250.00 Rp 750.00 Rp 78,000.00
39 Arrester Lightning Protection radius 50 m bh Rp - Rp - Rp -
40 Grounding System 0.2 Ohm bh Rp 135,000.00 Rp 4,050.00 Rp 1,350.00 Rp 140,400.00
41 Bak kontrol 600x600x400mm ls Rp - Rp - Rp - Rp -
42 Copper Rod 1" 4m bh Rp - Rp - Rp -
43 kabel BC titik Rp - Rp - Rp -
44 clamp rod lot Rp - Rp - Rp -
45 Clam Kabel BC lot Rp 5,500.00 Rp 165.00 Rp 55.00 Rp 5,720.00
46 Kabel BC 50 mm2 + Klem Kabel m Rp 45,000.00 Rp 1,350.00 Rp 450.00 Rp 46,800.00

PANEL
Box Panel Listrik Topi Pet
82 Box Panel 20 x 17 x 12 cm bh Rp - Rp - Rp -
83 Box Panel 20 x 30 x 15 cm bh Rp - Rp - Rp -
84 Box Panel 25 x 35 x 15 cm bh Rp - Rp - Rp -
85 Box Panel 30 x 40 x 20 cm bh Rp - Rp - Rp -
86 Box Panel 40 x 50 x 20 cm bh Rp - Rp - Rp -
87 Box Panel 40 x 60 x 20 cm bh Rp - Rp - Rp -
88 Box Panel 50 x 60 x 20 cm bh Rp - Rp - Rp -
89 Box Panel 50 x 70 x 20 cm bh Rp - Rp - Rp -
90 Box Panel 60 x 80 x 20 cm bh Rp - Rp - Rp -
91 Box Panel 60 x 80 x 25 cm bh Rp - Rp - Rp -
92 Pilot lamp bh Rp - Rp - Rp -
93 Grounding max 2 ohm (Copper Rod, kabel NYA, clamp rod) ls Rp - Rp - Rp -
94 Aksesoris Lain ls Rp - Rp - Rp -
95 Metering Tegangan, Arus, Pf, Frekuensi, Fuse, Accessories dll Set Rp - Rp - Rp -
96 Bushbar panel kecil ls Rp - Rp - Rp -
97 Bushbar panel besar ls Rp 125,000.00 Rp 3,750.00 Rp 1,250.00 Rp 130,000.00

MCB 1P
98 MCB 2A bh Rp 40,000.00 Rp 1,200.00 Rp 400.00 Rp 41,600.00
99 MCB 4A bh Rp 75,000.00 Rp 2,250.00 Rp 750.00 Rp 78,000.00
100 MCB 6A bh Rp - Rp - Rp -

ANALISA ME Page 204


101 MCB 10A bh Rp 23,599.00 Rp 707.97 Rp 235.99 Rp 24,542.96
102 MCB 16A bh Rp 23,599.00 Rp 707.97 Rp 235.99 Rp 24,542.96
103 MCB 20 A bh Rp 23,599.00 Rp 707.97 Rp 235.99 Rp 24,542.96
104 MCB 25 A bh Rp - Rp - Rp -
105 MCB 32 A bh Rp - Rp - Rp -
106 MCB 40 A bh Rp - Rp - Rp -
107 MCB 50 A bh Rp - Rp - Rp -
108 MCB 63 A bh Rp - Rp - Rp -
MCB 3P
107 MCB 4A bh Rp - Rp - Rp -
108 MCB 6A bh Rp - Rp - Rp -
109 MCB 10A bh Rp - Rp - Rp -
110 MCB 16A bh Rp - Rp - Rp -
111 MCB 20 A bh Rp - Rp - Rp -
112 MCB 25 A bh Rp - Rp - Rp -
113 MCB 32 A bh Rp - Rp - Rp -
114 MCB 40 A bh Rp - Rp - Rp -
115 MCB 50 A bh Rp - Rp - Rp -
116 MCB 63 A bh Rp - Rp - Rp -
MCCB
117 MCCB 40 A bh Rp - Rp - Rp -
118 MCCB 50 A bh Rp - Rp - Rp -
119 MCCB 63 A bh Rp - Rp - Rp -
120 MCCB 80 A bh Rp - Rp - Rp -
121 MCCB 100 A bh Rp - Rp - Rp -
122 MCCB 125 A bh Rp - Rp - Rp -
123 MCCB 160 A bh Rp - Rp - Rp -
123 MCCB 200 A bh Rp - Rp - Rp -
124 MCCB 250 A bh Rp - Rp - Rp -
124 MCCB 320 A bh Rp - Rp - Rp -
125 MCCB 400 A bh Rp - Rp - Rp -
126 MCCB 500 A bh Rp - Rp - Rp -
127 MCCB 600 A bh Rp - Rp - Rp -
128 Surge Arrester Domae 3P bh Rp - Rp - Rp -
129 ELCB 30mA bh Rp - Rp - Rp -
130 DOL ( Kontaktor, TOR, Timer, Push Button) ls Rp - Rp - Rp -

131 Pipa Galvanis


-Dia. 100mm m Rp - Rp - Rp -
-Dia. 80 mm m Rp - Rp - Rp -
-Dia. 65 mm m Rp - Rp - Rp -
-Dia. 50 mm m Rp - Rp - Rp -
-Dia. 40 mm m Rp - Rp - Rp -
-Dia. 32 mm m Rp - Rp - Rp -
-Dia.20 mm m Rp - Rp - Rp -
132 Pipa PVC
-Dia. 150 mm m Rp - Rp - Rp -
-Dia. 100 mm m Rp - Rp - Rp -
-Dia. 65 mm m Rp - Rp - Rp -
-Dia. 15 mm m Rp - Rp - Rp -
133 Pemipaan PVC AW Kamar Type 30 (6 Unit) m Rp - Rp - Rp -
134 Biaya Pasang Baru (BP) KWH m Rp 775.00
135 Uang Jaminan Langganan (UJL) m Rp 225.00
136 Sertifikat Laik Operasi (SLO) m Rp 20.00

TATA UDARA
137 Ceilling Fan WZ 56 P (55"; 220 V/80 W) Unit Rp - Rp - Rp -
138 Wall Fan WN 40 B (4578 CMH; 16"; 220 V/64 W) Unit Rp - Rp - Rp -
139 Wall Fan WN 30 B (2610 CMH; 12"; 220 V/40 W) Unit Rp - Rp - Rp -
Axial Fan 100000 CFM Unit Rp - Rp - Rp -
140 Exhaust fan Wall Mount 100 CFM Unit Rp - Rp - Rp -
141 Exhaust fan Wall Mount 45 CFM Unit Rp - Rp - Rp -
142 Exhaust Fan Ceilling 438 CMH Unit Rp 149,000.00 Rp 7,450.00 Rp 14,900.00 Rp 171,350.00

PLUMBING AIR BERSIH & AIR KOTOR


7 Deep Well Pump Unit Rp - Rp - Rp -
8 Filter Pump Unit Rp - Rp - Rp -
9 Transfer Pump Unit Rp - Rp - Rp -
10 Transfer Pump - Grundfos CR 5-8. Kap. 5 m3/jam Unit Rp - Rp - Rp -
11 Transfer Pump - Grundfos CR 5-22. Kap. 5 m3/jam Unit Rp - Rp - Rp -
12 Sump Pit Pump Unit Rp - Rp - Rp -
13 Booster Pump Unit Rp - Rp - Rp -
14 Booster Pump Set - Grundfos HYDRO MULTI-S 2 CM. 5-4 Kap. 10m3 Set Rp - Rp - Rp -
15 Circulation Pump Unit Rp - Rp - Rp -
16 Pompa sumur dangkal Shimizu PC268BIT Kap. 75 LPM Unit Rp - Rp - Rp -
17 Sand Filter 5 m3/h Unit Rp - Rp - Rp -
18 Carbon Filter 5 m3/h Unit Rp - Rp - Rp -
19 Sand Filter 10 m3/h Unit Rp - Rp - Rp -
20 Carbon Filter 10 m3/h Unit Rp - Rp - Rp -
21 Sand Filter 20 m3/h Unit Rp - Rp - Rp -
22 Carbon Filter 20 m3/h Unit Rp - Rp - Rp -
23 Chemical Feeder Unit Rp - Rp - Rp -
24 IPAL Bio Filter 25 m3/day Unit Rp - Rp - Rp -
25 Biaya Instalasi IPAL Unit Rp -
26 Water Tank Panel FRP 1 m3 Unit Rp - Rp - Rp -
27 Meteran Air Unit Rp - Rp - Rp -
28 Water Level Control Unit Rp 450,000.00 Rp 22,500.00 Rp 45,000.00 Rp 517,500.00

ANALISA ME Page 205


29 Roof Drain Dia 100 mm Unit Rp 26,000.00 Rp 1,300.00 Rp 2,600.00 Rp 29,900.00
30 Floor Drain Dia. 80 mm Unit Rp - Rp - Rp -
31 Gutter Air Hujan (10 x 10 mm) m Rp - Rp - Rp -
32 Pekerjaan Sumur Resapan m3 Rp - Rp - Rp -
33 Brackish Water Reverse Osmosis (96 m3/hari) Set Rp - Rp - Rp -
34 Sprinkler Taman Diameter 40 mm Unit Rp - Rp - Rp -
35 Sprinkler Taman Diameter 20 mm Unit Rp - Rp - Rp -
36 Return Inlet Diameter 1,5" Unit Rp - Rp - Rp -
37 Skimmer Main Drain 12"x12" Unit Rp - Rp - Rp -
1 Pipa PVC AW
-Dia. 150 mm m Rp - Rp - Rp -
-Dia. 125 mm m Rp - Rp - Rp -
-Dia. 110 mm m Rp - Rp - Rp -
-Dia. 100 mm (4") m Rp 94,374.75 Rp 46,893.00 Rp 9,437.48 Rp 150,705.23
-Dia. 75 mm (3") m Rp 56,961.50 Rp 46,893.00 Rp 5,696.15 Rp 109,550.65
-Dia. 65 mm (2,5") m Rp 40,452.50 Rp 29,524.45 Rp 4,045.25 Rp 74,022.20
-Dia. 50 mm (2") m Rp 27,748.25 Rp 29,524.45 Rp 2,774.83 Rp 60,047.52
-Dia. 40 mm (1 1/2") m Rp 21,691.25 Rp 21,972.25 Rp 2,169.13 Rp 45,832.63
-Dia. 32 mm (1 1/4") m Rp 18,892.50 Rp 21,972.25 Rp 1,889.25 Rp 42,754.00
-Dia. 25 mm (1") m Rp 12,750.00 Rp 21,972.25 Rp 1,275.00 Rp 35,997.25
-Dia. 20 mm (3/4") m Rp 9,249.50 Rp 21,972.25 Rp 924.95 Rp 32,146.70
-Dia. 12 mm (1/2") m Rp 6,822.25 Rp 21,972.25 Rp 682.23 Rp 29,476.73
2 Pipa PPR PN 10 - Rucika
-Dia. 160 mm (6") m Rp - Rp - Rp -
-Dia. 125 mm (5") m Rp - Rp - Rp -
-Dia. 110 mm (4") m Rp - Rp - Rp -
-Dia. 90 mm (3") m Rp - Rp - Rp -
-Dia. 75 mm (2 1/2") m Rp - Rp - Rp -
-Dia. 63 mm (2") m Rp - Rp - Rp -
-Dia. 50 mm (1 1/2") m Rp - Rp - Rp -
-Dia. 40 mm (1 1/4") m Rp - Rp - Rp -
-Dia. 32 mm (1") m Rp - Rp - Rp -
-Dia. 25 mm (3/4") m Rp - Rp - Rp -
-Dia. 20 mm (1/2") m Rp - Rp - Rp -
3 Clean out
-Dia. 100 mm bh Rp - Rp - Rp -
-Dia. 80 mm bh Rp - Rp - Rp -
4 Pipa PVC D
-Dia. 300 mm m Rp - Rp - Rp -
-Dia. 250 mm m Rp - Rp - Rp -
-Dia. 200 mm m Rp - Rp - Rp -
-Dia. 150 mm m Rp - Rp - Rp -
-Dia. 125 mm m Rp - Rp - Rp -
-Dia. 100 mm m Rp - Rp - Rp -
-Dia. 75 mm m Rp 15,475.00 Rp 773.75 Rp 1,547.50 Rp 17,796.25
-Dia. 65 mm m Rp - Rp - Rp -
-Dia. 50 mm m Rp - Rp - Rp -
-Dia. 40 mm m Rp - Rp - Rp -
-Dia. 30 mm m Rp - Rp - Rp -
5 Pipa Galvanis (GIP Medium)
-Dia. 150 mm m Rp - Rp - Rp -
-Dia. 100 mm m Rp - Rp - Rp -
-Dia. 80 mm m Rp - Rp - Rp -
-Dia. 65 mm m Rp - Rp - Rp -
-Dia. 50 mm m Rp - Rp - Rp -
-Dia. 40 mm m Rp - Rp - Rp -
-Dia. 35 mm m Rp - Rp - Rp -
-Dia. 25 mm m Rp - Rp - Rp -
-Dia. 20 mm m Rp - Rp - Rp -
-Dia. 15 mm m Rp - Rp - Rp -
6 Header
-Dia. 100 mm Rp - Rp - Rp -
-Dia. 80 mm Unit Rp - Rp - Rp -
-Dia. 40 mm Unit Rp - Rp - Rp -
7 Gate Valve
-Dia. 200 mm bh Rp - Rp - Rp -
-Dia. 150 mm bh Rp - Rp - Rp -
-Dia. 100 mm bh Rp - Rp - Rp -
-Dia. 80 mm bh Rp - Rp - Rp -
-Dia. 65 mm bh Rp - Rp - Rp -
-Dia. 50 mm bh Rp - Rp - Rp -
-Dia. 40 mm bh Rp - Rp - Rp -
-Dia. 25 mm bh Rp 190,000.00 Rp 9,500.00 Rp 19,000.00 Rp 218,500.00
8 Check Valve
-Dia. 200 mm bh Rp - Rp - Rp -
-Dia. 150 mm bh Rp - Rp - Rp -
-Dia. 100 mm bh Rp - Rp - Rp -
-Dia. 65 mm bh Rp - Rp - Rp -
-Dia. 50 mm bh Rp - Rp - Rp -
-Dia. 40 mm bh Rp - Rp - Rp -
9 Flexsible Joint
-Dia. 200 mm bh Rp - Rp - Rp -
-Dia. 150 mm bh Rp - Rp - Rp -
-Dia. 100 mm bh Rp - Rp - Rp -
-Dia. 80 mm bh Rp - Rp - Rp -
-Dia. 65 mm bh Rp - Rp - Rp -
-Dia. 50 mm bh Rp - Rp - Rp -

ANALISA ME Page 206


-Dia. 40 mm bh Rp - Rp - Rp -
10 Strainer
-Dia. 200 mm bh Rp - Rp - Rp -
-Dia. 150 mm bh Rp - Rp - Rp -
-Dia. 100 mm bh Rp - Rp - Rp -
-Dia. 80 mm bh Rp - Rp - Rp -
-Dia. 65 mm bh Rp - Rp - Rp -
-Dia. 50 mm bh Rp - Rp - Rp -
-Dia. 40 mm bh Rp - Rp - Rp -
-Dia. 25 mm bh Rp - Rp - Rp -
-Dia. 20 mm bh Rp - Rp - Rp -
-Dia. 15 mm bh Rp - Rp - Rp -
11 Foot Valve
-Dia. 200 mm bh Rp - Rp - Rp -
-Dia. 100 mm bh Rp - Rp - Rp -
-Dia. 80 mm bh Rp - Rp - Rp -
-Dia. 65 mm bh Rp - Rp - Rp -
12 Float Valve
-Dia. 150 mm bh Rp - Rp - Rp -
-Dia. 50 mm bh Rp - Rp - Rp -
13 Quantity Meter
-Dia. 50 mm bh Rp - Rp - Rp -
14 Bak Kontrol ls Rp - Rp - Rp -
15 Pressure Gauge bh Rp - Rp - Rp -
16 Level Switch bh Rp - Rp - Rp -
17 P-Trap (Dia. 50 mm) bh Rp - Rp - Rp -
18 Water Level Alarm bh Rp - Rp - Rp -
19 Tangki Atap Polyethelyne Kap. 3 m3 (Penguin) Unit Rp - Rp - Rp -
20 Bioseptic Tank. Kap. 9 m3. Unit Rp - Rp - Rp -
21 Bioseptic Tank. Kap. 5 m3. Unit Rp - Rp - Rp -
22 Bioseptic Tank. Kap. 2 m3. (Bulat) Unit Rp - Rp - Rp -
23 Pipa HDPE 2" PN10 m Rp - Rp - Rp -
24 Pipa HDPE 6" PN16 m Rp - Rp - Rp -
25 Internal Grease Trap 30 Liter Unit Rp - Rp - Rp -
26 Vent Cap Unit Rp - Rp - Rp -
27 Automatic Air Vent Unit Rp - Rp - Rp -
28 Kran Taman Toto T26-13 Unit Rp - Rp - Rp -
29 Talang Air PVC Kotak m1 Rp - Rp - Rp -
30 Roof Tank kap 650 L Unit Rp 1,070,000.00 Rp 53,500.00 Rp 107,000.00 Rp 1,230,500.00
31 Ball Valve 2 Inch bh Rp 54,500.00 Rp 2,725.00 Rp 5,450.00 Rp 62,675.00
32 Ball Valve 1,5 Inch bh Rp 52,000.00 Rp 2,600.00 Rp 5,200.00 Rp 59,800.00

ANALISA ME Page 207