8 Pek. Balok Lantai Beton Bertulang 15/20 mutu K225 Type BL-2
- Beton Mutu F'c = 19,3 Mpa (K 225) M³ 6.38 Rp 30,514,685.14 Rp 194,683,691.21
- Besi Beton Kg 1538.35 Rp 180,124.45 Rp 277,093,727.16
- Bekisting M² 148.87 #REF! #REF!
#REF!
9 Pek. Ringbalk Beton Bertulang 15/35 mutu K225 Type RB-3 1535
- Beton Mutu F'c = 19,3 Mpa (K 225) M³ 3.42 Rp 30,514,685.14 Rp 104,360,223.19
- Besi Beton Kg 878.58 Rp 180,124.45 Rp 158,253,559.16
- Bekisting M² 65.14 #REF! #REF!
#REF!
10 Pek. Cor Plat Dak/Atap Beton Bertulang mutu K225 Tebal = 10cm
- Beton Mutu F'c = 19,3 Mpa (K 225) M³ 14.90 Rp 30,514,685.14 Rp 454,668,808.63
- Besi Beton Kg 5161.22 Rp 180,124.45 Rp 929,662,454.20
- Bekisting M² 149.00 #REF! #REF!
#REF!
Jumlah IV #REF!
V. PEKERJAAN KAP ATAP & DINDING
1 Pek.Pas. Kuda-kuda Baja Ringan + Reng M2 260.55 #REF! #REF!
2 Pek. Atap Genteng Metal M2 260.55 #REF! #REF!
2 Pek. Pas. Kalsiplank 8mm M1 77.00 Rp 49,313.00 Rp 3,797,101.00
3 Pek. Pas. Plafond Kalsiboard 3,5mm + Rangka Hollow Lantai 1 M2 288.00 #REF! #REF!
4 List Profil Gypsum M1 77.00 Rp 63,000.00 Rp 4,851,000.00
5 Pek. Dinding Luar Exterior "MARMER" M2 20.00 #REF! #REF!
Jumlah V #REF!
VI. PEKERJAAN KUSEN PINTU, JENDELA, VENTILASI
1 Pek. Detail Type P1 + Accessories (sesuai detail gambar kerja kusen) Unit 3.00 #REF! #REF!
2 Pek. Detail Type P2 + Accessories (sesuai detail gambar kerja kusen) Unit 1.00 #REF! #REF!
Jumlah VI #REF!
VII. PEKERJAAN PENGECETAN
1 Pek. Pengecetan Dinding Tembok M2 3472.54 Rp 78,639.55 Rp 273,078,982.96
2 Pek. Pengecetan Plafond M2 288.00 Rp 78,639.55 Rp 22,648,190.40
Jumlah VII Rp 295,727,173.36
VIII. PEKERJAAN INSTALASI LISTRIK
1 Instalasi Titik Lampu & Stop Kontak, Saklar + MCB Titik 56.00 Rp 2,500.00 Rp 140,000.00
2 Kabel NYM 2 x 2,5mm Roll 10.00 Rp 40,000.00 Rp 400,000.00
3 Box MCB Unit 1.00 Rp 715.00 Rp 715.00
4 Stop Kontak Tunggal Bh 9.00 Rp 1,000.00 Rp 9,000.00
5 Saklar Tunggal Bh 1.00 Rp 4,500.00 Rp 4,500.00
6 Saklar Ganda Bh 13.00 Rp 2,000.00 Rp 26,000.00
7 Mongkok Unit 20.00 Rp 6,000.00 Rp 120,000.00
8 Pipa AB PVC 1/2 + Accessories M1 150.00 Rp 15,000.00 Rp 2,250,000.00
10 Lampu SL 18 Watt Bh 7.00 Rp 15,000.00 Rp 105,000.00
Jumlah VIII Rp 3,055,215.00
IX. PEKERJAAN SANITASI & INSTALASI AIR BERSIH/KOTOR
1 Pek. Ins. Sumur Dalam, Pompa 250 watt, Lengkap Accessories Ls Rp 15,000,000.00 Rp -
2 Pek. Pas. Closed Duduk Monoblock Psg Rp 904,200.00 Rp -
3 Flor Drain Psg Rp 79,310.00 Rp -
4 Kran Air 1/2" Atau 3/4" Bh Rp 23,870.00 Rp -
5 Pek. Pas. Pipa Air Bersih PVC 1/2"+Accessories M1 Rp 15,000.00 Rp -
6 Pek. Pas. Pipa Air Kotor PVC 3" M1 Rp 9,800.00 Rp -
7 Pek. Pas. Pipa Disposal Padat PVC 4" M1 Rp 30,000.00 Rp -
8 Pek. Septictank + Resapan Unit #REF! #REF!
Jumlah IX #REF!
X. PEKERJAAN KUBAH MESJID
1 Kubah 3/4 Ornament Diameter 5 Bh 1.00 Rp 122,870,000.00 Rp 122,870,000.00
2 Kubah 3/4 Ornament Diameter 2.5 Bh 2.00 Rp 50,600,000.00 Rp 101,200,000.00
3 Kubah 3/4 Ornament Diameter 2 Bh 2.00 Rp 24,750,000.00 Rp 49,500,000.00
Jumlah X Rp 273,570,000.00
XI. PEKERJAAN AKHIR
NO SATUAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
REKAPITULASI
NO. URAIAN PEKERJAAN JUMLAH HARGA
1 2 3
TERBILANG : SERATUS EMPAT PULUH DELAPAN JUTA LIMA RATUS TIGA PULUH
RIBU RUPIAH
KODE
NO SATUAN PEKERJAAN SATUAN VOLUME HARGA SATUAN
ANALISA
1 2 3 4 5 6
II. PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Pondasi Batu kali A.2.3.1.1 M3 1.22 Rp 86,625.00
2 Pek. Urugan Tanah Bekas Galian Pondasi Batu Kali A.2.3.1.9 M3 0.41 Rp 63,250.00
3 Pek. Urugan Tanah Timbunan Bawah Lantai A.2.3.1.14 M3 0.56 Rp 176,825.00
4 Pek. Urugan Pasir Bawah Pondasi A.2.3.1.11 M3 0.14 Rp 133,650.00
5 Pek. Urugan Pasir Bawah Lantai A.2.3.1.11 M3 0.23 Rp 133,650.00
Jumlah II
III. PEKERJAAN PASANGAN DAN PLESTERAN
1 Pek. Pasangan Batu Kosong A.3.2.1.9 M3 0.27 Rp 404,596.00
2 Pek. Pasangan Batu Kali / Belah 1 : 4 A.3.2.1.2 M3 0.84 Rp 819,186.00
3 Pek. Pas. Dinding 1/2 Bata 1 : 5 A.4.4.1.10 M2 13.50 Rp 147,731.00
4 Pek. Plesteran Dinding 1 : 5 A.4.4.2.5 M2 27.00 Rp 69,737.00
6 Pek. Acian A.4.4.2.27 M2 27.00 Rp 44,726.00
Jumlah III
IV. PEKERJAAN LANTAI
1 Pek. Pas. Lantai Keramik 25 x 25 cm A.4.4.3.69 M2 Rp 202,158.00
2 Pek. Pas. Dinding Keramik 25 x 40 Cm A.4.4.3.10
Jumlah III
V. PEKERJAAN BETON DAN BESI
1 Pek. Cor Lantai Kerja Tebal = 5cm A.4.1.1.1 M3 Rp 788,527.00
2 Pek. Sloof Beton Bertulang 15/20
- Beton 1 : 2 : 3 A.4.1.1.5 M3 Rp 912,550.00
- Besi Beton A.4.1.1.17 Kg Rp 16,820.60
- Bekisting A.4.1.1.21 M2 Rp 68,735.33
Jumlah IV
VI. PEKERJAAN KAP ATAP & PLAFOND
1 Pek.Pas. Kuda-kuda Baja Ringan + Reng A.4.2.1.24 M2 Rp 262,914.00
2 Pek. Atap Zincalum A.4.5.2.39 M2 Rp 88,642.00
4 Pek. Pas. Kalsiplank A.4.5.1.13 M Rp 33,179.00
5 Pek. Pas. Plafond Rangka Hollow A.4.2.1.21 M2 Rp 130,542.00
6 Pek. Pas. Plafond gypsum board A.4.5.1.7 M2 Rp 56,877.00
Jumlah V
VII. PEKERJAAN KUSEN PINTU, JENDELA, VENTILASI
1 Pek. Pemasangan Pintu Wc Alumunium A.4.6.3.1 Set Rp 4,575,649.60
4 Pek. Detail Type V1 + Accessories (sesuai detail gambar kerja kusen) A.4.6.3.5 Set Rp 140,148.40
KODE
NO SATUAN PEKERJAAN SATUAN VOLUME HARGA SATUAN
ANALISA
Jumlah VI
KODE
NO SATUAN PEKERJAAN SATUAN VOLUME HARGA SATUAN
ANALISA
VIII. PEKERJAAN PENGECETAN
1 Pek. Pengecetan Dinding Tembok A.4.7.1.10 m2 Rp 23,627.00
2 Pek. Pengecetan Plafond A.4.7.1.10 m2 Rp 23,627.00
3 Pek. Pengecetan LispLank A.4.7.1.11 m2 Rp 23,627.00
Jumlah VII
X. PEKERJAAN SANITASI
1 Pemasangan Floor Drain A.5.1.1.14 Buah 1.00 Rp 39,710.00
2 Pemasangan Closet Jongkok A.5.1.1.2 Buah 1.00 Rp 767,943.00
3 Pemasangan Kran Ø 1/2'' Atau 3/4'' A.5.1.1.19 Buah 2.00 Rp 98,202.00
4 Pemasangan Wastafel A.5.1.1.5 Buah Rp 1,381,193.00
6 Pemasangan Pipa PVC Ø ½'' (SNI) A.5.1.1.25 M 5.00 Rp 20,154.00
7 Pemasangan Pipa PVC Ø 3'' (SNI) A.5.1.1.31 M 5.00 Rp 54,749.00
8 Pekerjaan Septick Tank A.5.1.1.38 Buah 1.00 Rp 3,362,540.48
9 Pekerjaan Presapan Septick Tank A.5.1.1.39 Buah 1.00 Rp 470,992.50
Jumlah VIII
ENGINEERING ESTIMATE (E.E)
JUMLAH HARGA
7
Rp 105,249.38
Rp 25,616.25
Rp 99,464.06
Rp 18,042.75
Rp 30,071.25
Rp 278,443.69
Rp 109,240.92
Rp 691,188.19
Rp 1,994,368.50
Rp 1,882,899.00
Rp 1,207,602.00
Rp 5,885,298.61
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
JUMLAH HARGA
Rp -
JUMLAH HARGA
Rp -
Rp -
Rp -
Rp -
Rp 39,710.00
Rp 767,943.00
Rp 196,404.00
Rp -
Rp 100,770.00
Rp 273,745.00
Rp 3,362,540.48
Rp 470,992.50
Rp 5,212,104.98
REKAPITULASI PERHI
PEKERJAAN : TIMBUNAN TANAH DI AREA RUNWAY STRIP, PEMBUATAN SALURAN TERBUKA,
PEMASANGAN PAGAR PENGAMAN TYPE A DI AREA SISI UDARA, 1 PAKET
LOKASI : BANDAR UDARA MOROWALI
T.A : 2016
KONTRAK AWAL
NO URAIAN PEKERJAAN SAT VOLUME HARGA SAT
( Rp )
I PEKERJAAN PERSIAPAN
1 Quality Control Ls 1.000 38,600,000
2 Pengukuran Awal dan Akhir Ls 1.000 149,250,000
3 Pembuatan Direksi Kit M2 36.000 1,500,000
4 Mobilisasi dan Demobilisasi Ls 1.000 53,300,000
SUB TOTAL I
II PEKERJAAN TANAH
1 Pek. Clearing dan Grabbing M2 100,000 18,322
2 Pek. Pembersihan Lapisan Atas (Stripping) t=20cm M2 100,000 33,869
3 Pek. Timbunan Tanah M3 275,000 183,521
SUB TOTAL II
IV PEKERJAAN PAGAR
1 Pemasangan Pagar Batas Pengaman Bandara M1 1,000 777,590
SUB TOTAL IV
JUMLAH NILAI PEKERJAAN FISIK
PPN 10 %
TOTAL
DIBULATKAN
Menyetujui :
PEJABAT PEMBUAT KOMITMEN
KANTOR SATUAN PELAYANAN BANDAR UDARA MOROWALI
RIZKY WAHYUDIANTO, S.ST.
PENATA (III/d)
NIP. 19780828 200003 1 001
REKAPITULASI PERHITUNGAN TAMBAH KURANG (CC0.01)
URAN TERBUKA,
120,072,000 0.2030 - - - -
129,942,000 0.2197 - - - -
28,747,000 0.0486 - - - -
1,917,734,676 3.2424 - - - -
188,915,200 0.3194 - - - -
2,385,410,876 4.0331
Morow
Diperiksa oleh :
KONSULTAN SUPERVISI KONTR
CV. MAHAKARYA KONSULTAN PT. KARYA B
SUDIRMAN, ST HARTO
Site Engineer
TAMBAH KURANG
KUANTITAS RUPIAH (Rp)
KURANG TAMBAH KURANG
- - -
- - -
- - -
- - -
- -
- - - 288,200
- - - 98
- 55,056,300.000 - 4000000000
55,056,300.000 -
- - -
- - -
- - -
- - -
- - -
- - - -
- 459,109,819.177 - 263,856.2
459,109,819.177 - 513,733.782
1.9
(432,337.09)
(2.3557908605586)
2815
KONTRAKTOR PELAKSANA
PT. KARYA BANGUN MANDIRI PERSADA
HARTONO CHRISTANTO, ST.
Project Manager
1
64330 68150 38.2 50 0.764 0.236
44,761,704 ### 68150
67100 10.5 25 0.42
2740 1740
513,733,782.082
1947.02170044186
0.00
Jumlah Panjang Rehab 9.00 10.00 19.00
TOTAL PANJANG 60.00
I. PEKERJAAN PERSIAPAN
1 Pembersihan Awal Ls 1.00
2 Papan Nama Kegiatan Ls 1.00
3 Pengukuran dan Pemasangan Patok / Bowplank M' 19.00
4 Pembongkaran Ls 1.00
90.10
NO SATUAN PEKERJAAN SATUAN VOLUME Panjang Luasan Lebar a/h Lebar b/v Tinggi jumlah Kurang Tambah Tambah
X. PEKERJAAN SANITASI
1 Pemasangan Floor Drain Buah
2 Pemasangan Closet Jongkok Buah
3 Pemasangan Kran Ø 1/2'' Atau 3/4'' Buah
4 Pemasangan Wastafel Buah
6 Pemasangan Pipa PVC Ø ½'' (SNI) M
7 Pemasangan Pipa PVC Ø 3'' (SNI) M
8 Pekerjaan Septick Tank Buah
9 Pekerjaan Presapan Septick Tank Buah
X. PEKERJAAN AKHIR
1 Pek.Administrasi Dan Pelaporan Ls 1.00
2 Pengangkutan Sisa-Sisa Bahan/Pembersihan Akhir Proyek Ls 1.00
PERHITUNGAN VOLUME
KEGIATAN : PERENCANAAN REHAB GEDUNG BALAI PENYULUHAN KB
PEKERJAAN : PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI : GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN : 2022
PEKERJAAN PERSIAPAN
#N/A
PEKERJAAN PERSIAPAN
Papan Nama Kegiatan
PEKERJAAN PERSIAPAN
#N/A
50
PERHITUNGAN VOLUME
KEGIATAN 0 PERENCANAAN REHAB GEDUNG BALAI PENYULUHAN KB
PEKERJAAN 0 PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI 0 GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN 0 2022
PEKERJAAN PERSIAPAN
#N/A
Pondasi Type B
H V
3 1.5
1.5
6
PERHITUNGAN VOLUME
KEGIATAN 0 PERENCANAAN REHAB GEDUNG BALAI PENYULUHAN KB
PEKERJAAN 0 PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI 0 GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN 0 2022
JUMLAH = 22.74
VOLUME BERSIH 22.74 #N/A
Sketsa :
PERHITUNGAN VOLUME
KEGIATAN 0 PERENCANAAN REHAB GEDUNG BALAI PENYULUHAN KB
PEKERJAAN 0 PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI 0 GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN 0 2022
Pondasi Type B
H V
3 1.5
1.5
6
PERHITUNGAN VOLUME
KEGIATAN 0 PERENCANAAN REHAB GEDUNG BALAI PENYULUHAN KB
PEKERJAAN 0 PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI 0 GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN 0 2022
JUMLAH = 8.98
VOLUME BERSIH 8.98 #N/A
Sketsa :
PERHITUNGAN VOLUME
KEGIATAN 0 PERENCANAAN REHAB GEDUNG BALAI PENYULUHAN KB
PEKERJAAN 0 PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI 0 GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN 0 2022
Pondasi Type B
H V
3 1.5
1.5
6
PERHITUNGAN VOLUME
KEGIATAN 0 PERENCANAAN REHAB GEDUNG BALAI PENYULUHAN KB
PEKERJAAN 0 PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI 0 GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN 0 2022
Pondasi Type B
H V
3 1.5
1.5
6
PERHITUNGAN VOLUME
KEGIATAN 0 PERENCANAAN REHAB GEDUNG BALAI PENYULUHAN KB
PEKERJAAN 0 PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI 0 GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN 0 2022
H V
11.5 8
1.5 8
1.5 2.5
10
43
PERHITUNGAN VOLUME
KEGIATAN 0 PERENCANAAN REHAB GEDUNG BALAI PENYULUHAN KB
PEKERJAAN 0 PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI 0 GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN 0 2022
PEKERJAAN LANTAI
#N/A
PEKERJAAN LANTAI
#REF!
PEKERJAAN LANTAI
#REF!
PEKERJAAN LANTAI
#REF!
441,579.73
RIADIN, S. Sos, M,Si MOH. RIZAL S,Sos,. MM MOHAMMAD IQBAL FABIANSYAH RAHMAN
NIP. 19680502 199003 1N015 NIP. 19660403 198903 1 020 TIM LIEDER DIREKTUR
ANALISA HARGA SATUAN PEKERJAAN
A.4.1.1.5 Membuat 1 m³ beton mutu f’ = 14,5 MPa (K 175), slump (12 ±2) cm, w/c = 0,66
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp.) (Rp.)
A TENAGA
Pekerja L.1 OH 1.6500 100,000 165,000.00
Tukang Batu L.2 OH 0.2750 130,000 35,750.00
Kepala Tukang L.3 OH 0.0280 135,000 3,780.00
Mandor L.4 OH 0.0830 150,000 12,450.00
JUMLAH TENAGA KERJA 216,980.00
B BAHAN
Semen Portland Kg 326.0000 1,480 482,480.00
Pasir Beton (Kg) Kg 760.0000 54 40,714.29
Kerikil (Maks 30 mm) Kg 1029.0000 56 57,166.67
Air Liter 215.0000 150 32,250.00
JUMLAH HARGA BAHAN 612,610.95
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 829,590.95
E Overhead & Profit 10% 10% 82,959.10
F Harga Satuan Pekerjaan (D+E) 912,550.00
A.4.2.1.24 Pemasangan 1 m² pasang kuda-kuda baja ringan + reng untuk atap genteng biasa/metal
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien (Rp.) (Rp.)
A TENAGA
Pekerja L.1 OH 0.2000 100,000 20,000.00
Tukang Besi L.2 OH 0.4500 130,000 58,500.00
Kepala Tukang L.3 OH 0.0100 135,000 1,350.00
Mandor L.4 OH 0.0500 150,000 7,500.00
JUMLAH TENAGA KERJA 87,350.00
B BAHAN
Baja ringan canai dingin C75 M' 3.7200 20,833 77,500.00
Baut (Srew driver) bh 28.0000 412 11,536.00
Dynabol dia 12 x 120 mm bh 2.0000 2,000 4,000.00
Reng Canai Dingin M' 5.4000 7,500 40,500.00
Talang / Jurai Canai Dingin M' 0.1240 35,000 4,340.00
JUMLAH HARGA BAHAN 137,876.00
C PERALATAN
Alat Rangka Atap Baja Canai Dingin 0.1000 13,787.60
JUMLAH HARGA ALAT 13,787.60
D Jumlah (A+B+C) 239,013.60
E Overhead & Profit 10% 10% 23,901.36
F Harga Satuan Pekerjaan (D+E) 262,914.00
A.4.4.1.10 Pemasangan 1m² dinding bata merah (5x11x22)cm tebal ½ batu campuran 1 SP : 5 PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien (Rp.) (Rp.)
A TENAGA
Pekerja L.1 OH 0.3000 100,000 30,000.00
Tukang Batu L.2 OH 0.1000 130,000 13,000.00
Kepala Tukang L.3 OH 0.0100 135,000 1,350.00
Mandor L.4 OH 0.0150 150,000 2,250.00
JUMLAH TENAGA KERJA 46,600.00
B BAHAN
Bata merah Buah 70.0000 1,000 70,000.00
Semen Portland Kg 9.6800 1,480 14,326.40
Pasir Pasang m³ 0.0450 75,000 3,375.00
JUMLAH HARGA BAHAN 87,701.40
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 134,301.40
E Overhead & Profit 10% 10% 13,430.14
F Harga Satuan Pekerjaan (D+E) 147,731.00
A.4.4.3.71 Pemasangan 1m² lantai keramik Dinding Corak ukuran 40cm x 40cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien (Rp.) (Rp.)
A TENAGA
Pekerja L.1 OH 0.2700 100,000 27,000.00
Tukang Batu L.2 OH 0.1350 130,000 17,550.00
Kepala tukang L.3 OH 0.0140 135,000 1,890.00
Mandor L.4 OH 0.0140 150,000 2,100.00
JUMLAH TENAGA KERJA 48,540.00
B BAHAN
keramik Dinding ukuran 40cm x 40cm Bh 6.6300 10,000 66,300.00
Semen Portland Kg 9.8000 1,480 14,504.00
Pasir Pasang M3 0.6000 75,000 45,000.00
Semen Warna Kg 0.0450 22,000 990.00
JUMLAH HARGA BAHAN 126,794.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 175,334.00
E Overhead & Profit 10% 10% 17,533.40
F Harga Satuan Pekerjaan (D+E) 192,867.00
A.4.7.1.10 Pengecatan 1 m² tembok baru ( 1lapis Plamur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien (Rp.) (Rp.)
A TENAGA
Pekerja L.1 OH 0.020 100,000 2,000.00
Tukang cat L.2 OH 0.063 130,000 8,190.00
Kepala tukang L.3 OH 0.006 135,000 850.50
Mandor L.4 OH 0.003 150,000 450.00
JUMLAH TENAGA KERJA 11,490.50
B BAHAN
Plamur Kg 0.100 16,600 1,660.00
Cat dasar Tembok Kg 0.100 23,136 2,313.60
Cat Penutup Tembok Kg 0.260 23,136 6,015.36
JUMLAH HARGA BAHAN 9,988.96
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 21,479.46
E Overhead & Profit 10% 10% 2,147.95
F Harga Satuan Pekerjaan (D+E) 23,627.00
A.4.7.1.11 Pengecatan 1 m² tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien (Rp.) (Rp.)
A TENAGA
Pekerja L.1 OH 0.028 100,000 2,800.00
Tukang cat L.2 OH 0.042 130,000 5,460.00
Kepala tukang L.3 OH 0.004 135,000 567.00
Mandor L.4 OH 0.003 150,000 450.00
JUMLAH TENAGA KERJA 9,277.00
B BAHAN
Cat dasar Tembok Kg 0.120 23,136 2,776.32
Cat Penutup Tembok Kg 0.180 23,136 4,164.48
JUMLAH HARGA BAHAN 6,940.80
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 16,217.80
E Overhead & Profit 10% 10% 1,621.78
F Harga Satuan Pekerjaan (D+E) 17,839.00
A.4.7.1.19 Pengecatan 1 m² permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien (Rp.) (Rp.)
A TENAGA
Pekerja L.1 OH 0.060 100,000 6,000.00
Tukang cat L.2 OH 0.060 130,000 7,800.00
Kepala tukang L.3 OH 0.012 135,000 1,620.00
Mandor L.4 OH 0.003 150,000 450.00
JUMLAH TENAGA KERJA 15,870.00
B BAHAN
Cat Besi Kg 0.300 12,408 3,722.40
Kuas Bh 0.010 15,000 150.00
Pengencer L 0.010 12,000 120.00
JUMLAH HARGA BAHAN 3,992.40
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 19,862.40
E Overhead & Profit 10% 10% 1,986.24
F Harga Satuan Pekerjaan (D+E) 21,848.00
I. UPAH KERJA
1 Pekerja L.1 Rp 100,000.00 Oh
2 Tukang Batu/Kayu/Besi/Cat/Las L.2 Rp 130,000.00 Oh
3 Kepala Tukang L.3 Rp 135,000.00 Oh
4 Mandor L.4 Rp 150,000.00 Oh
III. PERALATAN
1 Alat Bantu T.1 Rp 50,000.00 Set
2 Sewa Stager (2Set) T.2 Rp 110,000.00 Set
3 Listrik Kerja T.3 Rp 5,000.00 Ls
4 Alat Bantu Lainnya T.4 Rp 10,000.00 Ls
DAFTAR PERHITUNGAN KONVERSI BESI
Luas
Berat Besi / Vol. (Item
Dimensi Beton / M¹ Bekisting / Jenis Besi Besi Begel / M¹ Jumlah Besi Panjang Besi Berat Besi / M³ Total Berat Besi
No. Uraian Pekerjaan M Pek.)
M²
1 Sloof 15/20 0.20 0.15 0.03 33.33 14.80 12.00 0.888 2.000 66.67 59.18
0.20 0.15 0.03 33.33 12.00 0.888 2.000 66.67 59.18
0.20 0.15 0.03 33.33 8.00 0.395 0.15 6.67 4.667 155.56 61.38
- 179.74 1.11 199.516
2 Kolom 11/11 0.11 0.11 0.01 82.64 7.48 12.00 0.888 2.000 165.29 146.74
0.11 0.11 0.01 82.64 12.00 0.888 2.000 165.29 146.74
0.11 0.11 0.01 82.64 8.00 0.395 0.15 6.67 2.933 242.42 95.65
389.13 0.21 80.043
4 Balok Latei 0.11 0.15 0.02 60.61 8.32 12.00 0.888 2.000 121.21 107.61
11/15 0.11 0.15 0.02 60.61 12.00 0.888 2.000 121.21 107.61
0.11 0.15 0.02 60.61 8.00 0.395 0.15 6.67 3.467 210.10 82.90
298.11 0.26 78.702
5 RingBalk 0.11 0.15 0.02 60.61 7.03 12.00 0.888 2.000 121.21 107.61
11/15 0.11 0.15 0.02 60.61 12.00 0.888 2.000 121.21 107.61
0.11 0.15 0.02 60.61 8.00 0.395 0.13 8.00 4.160 252.12 99.48
314.69 0.31 98.656
6 0.07 2.00 0.14 7.14 2.25 8.00 0.395 0.15 13.33 14.333 102.38 40.40
Plat Atap/Dak
T = 0.07 cm 0.07 0.50 0.04 28.57 8.00 0.395 0.15 13.33 14.333 409.52 161.58
201.98 0.16 31.811
6 0.07 1.20 0.08 11.90 0.72 8.00 0.395 0.15 13.33 14.333 170.63 67.33
Plat Atap/Dak
T = 0.07 cm 0.07 0.60 0.04 23.81 8.00 0.395 0.15 13.33 14.333 341.27 134.65
201.98 0.05 10.180
DAFTAR ANALISA HARGA SATUAN
KEGIATAN : PERENCANAAN REHAB GEDUNG BALAI PENYULUHAN KB
PEKERJAAN : PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI : GEDUNG BALAI PENYULUHAN KB KEC
TAHUN : 2022
A.2.2.1.2. Pembuatan 1 m² pagar sementara dari seng gelombang tinggi 2 meter (K3)
No Uraian Satuan Kode Koefisien Harga Satuan Jumlah Harga
A. Tenaga
Pekerja #N/A L.1 0.2 Rp. #N/A Rp. #N/A
Tukang #N/A L.2 0.4 Rp. #N/A Rp. #N/A
Kepala Tukang #N/A L.3 0.02 Rp. #N/A Rp. #N/A
Mandor #N/A L.4 0.02 Rp. #N/A Rp. #N/A
Rp. #N/A
B. Bahan
Dolken kayu Ø 8-10/400 cm Batang 1.250 Rp. Rp. -
Semen Portland Kg 2.500 Rp. Rp. -
Seng gelombang Lbr 1.200 Rp. Rp. -
Pasir beton m³ 0.005 Rp. Rp. -
Koral beton m³ 0.009 Rp. Rp. -
Kayu 5/7 m³ 0.072 Rp. Rp. -
Paku biasa Kg 0.060 Rp. Rp. -
Meni besi Liter 0.450 Rp. Rp. -
Rp. -
C. Jumlah A+B = Rp. #N/A
D. Overhead & Profit 10 % x C = Rp. #N/A
E. Harga Satuan Pekerjaan (C+D) Jumlah Rp. #N/A
A.2.2.1.3. Pembuatan 1 m² pagar sementara dari kawat duri tinggi 1,8 meter
No Uraian Satuan Kode Koefisien Harga Satuan Jumlah Harga
A. Tenaga
Pekerja #N/A L.1 0.2000 Rp. #N/A Rp. #N/A
Tukang #N/A L.2 0.3000 Rp. #N/A Rp. #N/A
Kepala Tukang #N/A L.3 0.0200 Rp. #N/A Rp. #N/A
Mandor #N/A L.4 0.0200 Rp. #N/A Rp. #N/A
Rp. #N/A
B. Bahan
Dolken kayu Ø 8-10/400 cm Batang 1.000 Rp. Rp. -
Semen Portland Kg 2.000 Rp. Rp. -
Kawat duri M’ 25.000 Rp. Rp. -
Pasir beton m³ 0.005 Rp. Rp. -
Koral beton m³ 0.009 Rp. Rp. -
Paku biasa 2” - 5” Kg 0.060 Rp. Rp. -
Rp. -
C. Jumlah A+B = Rp. #N/A
D. Overhead & Profit 10 % x C = Rp. #N/A
E. Harga Satuan Pekerjaan (C+D) Jumlah Rp. #N/A
Luas
Berat Besi / Total Besi Total Berat Berat Besi /
Dimensi Beton / M¹ Bekisting / Jenis Besi Besi Begel / M¹ Jumlah Besi Panjang Besi
No. Uraian Pekerjaan M Begel Besi Pokok M³
M²
1 Poorplat 0.30 1.25 0.38 2.67 8.27 19.00 2.226 0.15 6.67 20.667 55.11 122.653
PP-1 0.30 1.25 0.38 2.67 19.00 2.226 0.15 6.67 20.667 55.11 122.653
- 122.653
2 Poorplat 0.30 1.35 0.41 2.47 8.15 19.00 2.226 0.15 6.67 22.000 54.32 120.895
PP-2 0.30 1.35 0.41 2.47 19.00 2.226 0.15 6.67 22.000 54.32 120.895
- 120.895
3 Sloof 25/35 0.35 0.25 - 97.60 68.32 16.00 1.578 10 0.617 0.15 0.20 1.12 569.33 6.000 648.60 393.11 1,023.65 1,416.760
SL 0.35 0.25 - 85.60 59.92 16.00 1.578 10 0.617 0.15 0.20 1.12 499.33 6.000 576.60 344.78 910.01 1,254.793
128.24 - 2,671.553
4 Kolom 35/35 K-1 0.35 0.35 0.12 8.16 11.43 19.00 2.226 4.000 32.65 72.672
0.35 0.35 0.12 8.16 19.00 2.226 4.000 32.65 72.672
0.35 0.35 0.12 8.16 10.00 0.617 0.18 5.71 8.000 65.31 40.261
185.604
5 Kolom 35/35 K-2 0.35 0.35 0.12 8.16 11.43 19.00 2.226 5.000 40.82 90.839
0.35 0.35 0.12 8.16 19.00 2.226 5.000 40.82 90.839
0.35 0.35 0.12 8.16 10.00 0.617 0.18 5.71 8.000 65.31 40.261
221.940
6 Kolom 35/35 K-3 0.35 0.35 0.12 8.16 11.43 19.00 2.226 3.000 24.49 54.504
0.35 0.35 0.12 8.16 19.00 2.226 3.000 24.49 54.504
0.35 0.35 0.12 8.16 10.00 0.617 0.18 5.71 8.000 65.31 40.261
149.268
7 Kolom 15/15 KP 0.15 0.15 0.02 44.44 26.67 10.00 0.617 2.000 88.89 54.800
0.15 0.15 0.02 44.44 10.00 0.617 2.000 88.89 54.800
0.15 0.15 0.02 44.44 6.00 0.222 0.18 5.71 3.429 152.38 33.819
143.419
8 Balok Latei 15/18 0.18 0.15 0.03 37.04 18.89 10.00 0.617 2.000 74.07 45.667
BT 0.18 0.15 0.03 37.04 10.00 0.617 2.000 74.07 45.667
0.18 0.15 0.03 37.04 6.00 0.222 0.18 5.71 3.771 139.68 31.001
122.334
9 Balok Lantai 0.40 0.30 0.12 8.33 9.17 16.00 1.578 5.000 41.67 65.760
30/40 BL-1 0.40 0.30 0.12 8.33 16.00 1.578 4.000 33.33 52.608
0.40 0.30 0.12 8.33 10.00 0.617 0.18 5.71 8.000 66.67 41.100
159.468
10 Balok Lantai 0.40 0.30 0.12 8.33 9.17 16.00 1.578 6.000 50.00 78.912
30/40 BL-2 0.40 0.30 0.12 8.33 16.00 1.578 4.000 33.33 52.608
0.40 0.30 0.12 8.33 10.00 0.617 0.18 5.71 8.000 66.67 41.100
172.620
11 Balok Lantai 0.40 0.30 0.12 8.33 9.17 16.00 1.578 5.000 41.67 65.760
30/40 BL-3 0.40 0.30 0.12 8.33 16.00 1.578 3.000 25.00 39.456
0.40 0.30 0.12 8.33 10.00 0.617 0.23 4.44 6.222 51.85 31.967
137.183
12 Balok Lantai 0.35 0.25 0.09 11.43 10.86 16.00 1.578 5.000 57.14 90.185
25/35 BL-4 0.35 0.25 0.09 11.43 16.00 1.578 3.000 34.29 54.111
0.35 0.25 0.09 11.43 10.00 0.617 0.18 5.71 6.857 78.37 48.313
192.610
13 RingBalk 0.40 0.25 0.10 10.00 10.50 16.00 1.578 5.000 50.00 78.912
25/40 RB-1 0.40 0.25 0.10 10.00 16.00 1.578 2.000 20.00 31.565
0.40 0.25 0.10 10.00 10.00 0.617 0.23 4.44 5.778 57.78 35.620
146.097
14 RingBalk 0.40 0.25 0.10 10.00 10.50 16.00 1.578 4.000 40.00 63.130
30/50 RB-2 0.40 0.25 0.10 10.00 16.00 1.578 3.000 30.00 47.347
0.40 0.25 0.10 10.00 10.00 0.617 0.23 4.44 5.778 57.78 35.620
146.097
Luas
Berat Besi / Total Besi Total Berat Berat Besi /
Dimensi Beton / M¹ Bekisting / Jenis Besi Besi Begel / M¹ Jumlah Besi Panjang Besi
No. Uraian Pekerjaan M Begel Besi Pokok M³
M²
15 RingBalk 0.40 0.25 0.10 10.00 10.50 16.00 1.578 3.000 30.00 47.347
25/40 RB-3 0.40 0.25 0.10 10.00 16.00 1.578 3.000 30.00 47.347
0.40 0.25 0.10 10.00 10.00 0.617 0.18 5.71 7.429 74.29 45.797
140.492
16 RingBalk 0.35 0.25 0.09 11.43 10.86 16.00 1.578 3.000 34.29 54.111
25/35 RB-4 0.35 0.25 0.09 11.43 16.00 1.578 3.000 34.29 54.111
0.35 0.25 0.09 11.43 10.00 0.617 0.23 4.44 5.333 60.95 37.577
145.799
17 0.12 1.00 0.12 8.33 8.33 12.00 0.888 0.15 13.33 14.333 119.44 106.038
Plat Lantai
T = 12 cm 0.12 1.00 0.12 8.33 12.00 0.888 0.15 13.33 14.333 119.44 106.038
212.076
18 0.10 1.00 0.10 10.00 10.00 12.00 0.888 0.23 8.89 9.889 98.89 87.790
Plat Tangga
T = 10 cm 0.10 1.00 0.10 10.00 8.00 0.395 0.15 13.33 14.333 143.33 56.554
144.343
19 Anak Tangga 0.30 0.20 0.03 33.33 1.00 10.00 0.617 5.000 166.67 102.750
20/30 0.30 0.20 0.06 16.67 8.00 0.395 0.15 6.67 6.667 111.11 43.840
146.590
20 0.10 1.00 0.10 10.00 10.00 12.00 0.888 0.15 13.33 14.333 143.33 127.246
Plat Atap/Dak
T = 10 cm 0.10 1.00 0.10 10.00 12.00 0.888 0.15 13.33 14.333 143.33 127.246
254.491
21 0.10 1.00 0.10 10.00 10.00 10.00 0.617 0.15 13.33 14.333 143.33 88.365
SunScreen
T = 10 cm 0.10 1.00 0.10 10.00 8.00 0.395 0.15 13.33 14.333 143.33 56.554
144.919
22 0.10 1.00 0.10 10.00 10.00 8.00 0.395 0.15 13.33 14.333 143.33 56.554
Meja Dapur
T = 8 cm 0.10 1.00 0.10 10.00 8.00 0.395 0.15 13.33 14.333 143.33 56.554
113.107
23 Plat Penutup 0.08 1.00 0.08 12.50 12.50 8.00 0.395 0.23 8.89 9.889 123.61 48.772
Septictank
T = 8 cm 0.08 1.00 0.08 12.50 8.00 0.395 0.23 8.89 9.889 123.61 48.772
97.544
LEMBAR BACK UP DATA
PERHITUNGAN VOLUME
PEKERJAAN : PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATA
LOKASI : GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN : 2022
250
160
160
240
240
110
110
240
240
2000
240
240
A A
110
110
240
240
160
160
100
100
150
150
+2.68
18
+2.50
5
20
-0.60
45
35 35
65 65
85 85
90
Camp. 1pc:4psr
-1.05
Pas. Batu Kosong
35
Lapisan Pasir Urug -1.35
-1.40
5
35 35
65 65
85 85
90
01 01 02 01 01
195
195
2 60
26 0
2 50
250
Ø19 - 15 Ø19 - 15
10
10
30
30
Ø19 - 15 Ø19 - 15
5 10
5 10
Cor Lantai Kerja Mutu K-175 Cor Lantai Kerja Mutu K-175
Lapisan Pasir Urug Lapisan Pasir Urug
10 175 10 10 175 10
195 195
350
B01 A01
LEMBAR BACK UP DATA
PERHITUNGAN VOLUME
PEKERJAAN : PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI : GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN : 2022
. K1 . K1 . K1 . K1 . K1 06
SL 25/35 SL 25/35 SL 25/35 SL 25/35 S L 25 /35
S L 25 /35
S L 25 / 35
S L 25 /35
S L 2 5 /35
350
3 50
SL 25/35 SL 25/35 SL 25/35
. K1 . K1 . K1 . K2 . K1 05
S L 25 /35
S L 25 /35
S L 25 /35
S L 25 /35
S L 25 / 35
350
3 50
S L 25 /35
S L 25 /35
S L 25 /35
1750
3 50
SL 25/35 SL 25/35
2 00
S L 25 /35
S L 2 5 /35
350
SL 25/35 SL 25/35
. K1 . K2 . K1 . K1 02
S L 25 /35
S L 25 / 35
1 75
S L 25 /35
S L 25 /35
SL 25/35
350
1 75
K4 K4 K4
SL 25/35 SL 25/35 SL 25/35
. K1 . K1 . . . . K1 . K1 . K1 01
1 00
SL 25/35 SL 25/35
93 83 83 92
200 150 200 350 350 350
F E D C B A
LEMBAR BACK UP DATA
PERHITUNGAN VOLUME
PEKERJAAN : PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI : GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN : 2022
+2.05
Pas. Dinding 1/2 Bata
Camp. 1pc:5psr
4 3 ,1
RG. STAF
+0.05 Spesi tebal 5 cm Pas. Tegel 25/25
Cor Lantai Beton tebal 7 cm Mutu K-175
Sloof 25/35 (SL) Beton Bertulang
Mutu K-225
±0.00 87.5 87.5 175 87.5 87.5
-0.07
10 7
-0.60
01 01 02 01 01
45
45
45
45
35
35
35 35 35
65 65 65
85 85 85
1 95
195
260
260
175 175
25 0
25 0
Ø19 - 15 Ø19 - 15
10
10
30
30
Ø19 - 15 Ø19 - 15
5 10
5 10
Cor Lantai Kerja Mutu K-175 Cor Lantai Kerja Mutu K-175
Lapisan Pasir Urug Lapisan Pasir Urug
10 175 10 10 175 10
195 195
350
B01 A01
LEMBAR BACK UP DATA
PERHITUNGAN VOLUME
PEKERJAAN : PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI : GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN : 2022
BORDES
+2.45
+2.05
Sketsa : Pas. Dinding 1/2 Bata
4 3 ,1
Camp. 1pc:5psr
Kaca Buram Kaca Buram
5 mm 5 mm
+1.62
RG. STAF
+0.05 Spesi tebal 5 cm Pas. Tegel 25/25
Cor Lantai Beton tebal 7 cm Mutu K-175
Sloof 25/35 (SL) Beton Bertulang
Mutu K-225
±0.00
-0.07
10 7
-0.17
43
-0.60
45
45
45
45
35
35
35 35 35
65 65 65
85 85 85
175 175
LEMBAR BACK UP DATA
PERHITUNGAN VOLUME
PEKERJAAN : PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI : GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN : 2022
BORDES
+2.45
+2.05
Sketsa : Pas. Dinding 1/2 Bata
4 3 ,1
Camp. 1pc:5psr
Kaca Buram Kaca Buram
5 mm 5 mm
+1.62
RG. STAF
+0.05 Spesi tebal 5 cm Pas. Tegel 25/25
Cor Lantai Beton tebal 7 cm Mutu K-175
Sloof 25/35 (SL) Beton Bertulang
Mutu K-225
±0.00
-0.07
10 7
-0.17
43
-0.60
45
45
45
45
35
35
35 35 35
65 65 65
85 85 85
175 175
LEMBAR BACK UP DATA
PERHITUNGAN VOLUME
PEKERJAAN : PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI : GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN : 2022
Bukaan
Pintu 0.9 1.62 3 4.37
Ventilasi
+2.05
Pas. Dinding 1/2 Bata
Camp. 1pc:5psr
43,1
RG. STA F
+0.05 Spesi tebal 5 cm Pas. Tegel 25/25
Cor Lantai Beton tebal 7 cm Mutu K-175
Sloof 25/35 (SL) Beton Bertulang
Mutu K-225
±0.00
-0.07
10 7
-0.17
43
-0.60
45
45
45
45
35
35 35 35
65 65 65
85 85 85
175 175
LEMBAR BACK UP DATA
PERHITUNGAN VOLUME
PEKERJAAN : PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI : GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN : 2022
Bukaan
Pintu 0.9 1.62 2 2.92
Ventilasi
KM/WC
+4.00
F E D C A B A
1600
F E D
75 125 150 200 100 250 350 175 175
1600
75 125 150 200 100 250
06 06 06
+0.05
350
SEKSI SEKSI
+0.05 +0.05
05 05 05
RG. Ka. TU
Panjang RG. PERTEMUAN
3 50
350
350
+4.05
RG. STAF RG. STAF +0.05
+0.05 +0.05
04 04 04
S HAF T 02
SH AFT 02
175
175
GUDANG KM/WC
+0.05 +4.00
3 50
185 0
S HAF T 01
SH AFT 01
+0.05 +0. 05
175
175
KM/WC KM/WC
±0.00 +4.00
03 03 03
Tinggi
2 00
KM/WC KM/WC
±0.00 ±0.00
LOBBY
350
350
+0.05 LOBBY
+4.05
+2.60 +2.20
1 50
+2.80 +2.00
+3.00 +1.80
+3.20 +1.60
350
+0.40
+0.20 RG. SERBA GUNA
VOYER +4.05
±0.00
+0.05
01 01 01
1 00
100
100
91 84 84 9
200 150 200 91 84 84 91 350 350 75 125 350 350
1600 1600
F E D C B A F E D
A
LEMBAR BACK UP DATA
PERHITUNGAN VOLUME
PEKERJAAN : PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI : GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN : 2022
1600
75 125 150 200 100 250 350 350
06 06
3 50
350
05 05
+4.05 +4.05
04 04
S HA FT 02
175
KM/WC
+4.00
3 50
1 85 0
1 85 0
S HA FT 01
175
KM/WC
+4.00
03 03
BORDES Tinggi
+2.45
3 50
350
LOBBY
4 10
+4.05
+2.60 +2.20
+2.80 +2.00
+3.00 +1.80
+3.20 +1.60
02 +3.40 +1.40
02
+3.60 +1.20
+3.80
3 50
350
LOBBY
+4.05
01 01
1 00
100
91 84 84 91
75 125 350 350 350 350
1600
F E D C B A
A
LEMBAR BACK UP DATA
PERHITUNGAN VOLUME
PEKERJAAN : PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI : GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN : 2022
Bukaan
Pintu 0.9 1.62 3 4.37
Ventilasi
Kali
JUMLAH = 0.00 36.53 0.00 2
VOLUME BERSIH 73.06 m2
Sketsa :
BORDES
+2.45
+2.05
Pas. Dinding 1/2 Bata
Camp. 1pc:5psr
4 3,1
RG. STAF
+0.05 Spesi tebal 5 cm Pas. Tegel 25/25
Cor Lantai Beton tebal 7 cm Mutu K-175
Sloof 25/35 (SL) Beton Bertulang
Mutu K-225
±0.00
10 7
-0.07
-0.17
43
-0.60
45
45
45
45
35
35
35
35 35 35
65 65 65
85 85 85
175 175
LEMBAR BACK UP DATA
PERHITUNGAN VOLUME
PEKERJAAN : PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI : GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN : 2022
Bukaan
Pintu 0.9 1.62 2 2.92
Ventilasi
Kali
JUMLAH = 0.00 18.14 0.00 2
50 VOLUME BERSIH 36.29 m2
Sketsa :
KM/WC
+4.00
224.5
K6
116.6
K5
116.6
K4
116.6
K3
116.6
K2
116.6
K1
116.6
K2
116.6
K3
116.6
K4
F
116.6
K5
116.6
K6
E
224.5
D C A B A
K1
Tiang Kuda-Kuda CT.75
1600 +13.31
Kaki Kuda-Kuda CT.75
Skor CT.75
F E D
75 125 150 200 100 250 350 175 175 Skor CT.75
Skor CT.75
Ata p Metal "Multy roof" 1600
75 125 150 200 100 250
421
Reng A.45
90 90
RingBalk 25/35 Beton Bertulang
06 Mutu K-225 06 06
Kaki Kuda-Kuda CT.75
90 Kuda-kuda Baja Ringan 90 Batang Tarik CT.75
Plat Penutup/Dak tebal 10cm Beton Bertulang
Mutu K-225
RingBalk 25/40 Beton Bertulang
3 50
3 50
3 50
350
Mutu K-225
+4.05
RG. STAF RG. STAF +0.05
+0.05 +0.05
RG. PERTEMUA N RG. L OBBY Balok Lantai 30/40 Beton Bertulang K M/WC RG. PERTEMUA N RG. PERTEMUAN
+4.05 +4.05 Mutu K-225 +4.00 +4.05 +4.05 Balok Lantai 30/40 Beton Bertulang
Mutu K-225
+4.00
04 04 Balok Latei 15/18 Beton
04
Pasangan Dinding 1/2 Bata
Camp. 1pc:5psr
S HAF T 02
S H AFT 02
175
Ø1 0 - 15
+3.28
GUDANG
Rangka Hollow Besi Galvanis
Uk. 4 x 4 x 2,5 mm
Exhaust Wc/Km +3.28 Ø 10 - 15
Plat Sunscreen tebal 10cm Beton Bertulang
Mutu K-225
KM/WC
PLA FO ND PLA FOND +4. 00
Ø 8 - 15 Ø 8 - 15
+0.05
400
3 50
1 85 0
1 850
S H AFT 01
+0.05 +0.05
1 75
175
KM/WC Ø8- 15
Sloof 25/35 Beton Bertulang KM/WC
RG. B ENDAHARA RG. STA F RG. L OBBY ±0.00 VOYER Sloof 25/35 Beton Bertulang KM/WC
8
8 DAPUR RG. STAF RG. STA F R G. STA F Mutu K-225 +4.00
+0.05 +0.05 +0.05 ±0.00 Mutu K-225 ±0.00 75 +0.05 +0.05 +0.05 +0.05
03 Pas. Pondasi Batu Kali
03 ±0.00 Pas. Pondasi Batu Kali
03
60
-0.60
KM/WC KM/WC
45
80
80
80
±0.00 ±0.00
LOBBY
3 50
350
LOBBY
260
+0.05
85 85 85 85 +4.05
30
+2.60 +2.20
105 105 105 105
1 50
+2.80 +2.00
10 +3.00 +1.80 10
30 +3.20 +1.60 30
-3.20
02 RG. KEPALA
175 UPT 10
+1.40
02 175 10 02
+0.05 +1.20
350 350 350 350 350 +1.00 350 300 600 350
+0.80
+0.60 F D B A
1750
3 50
3 50
350
+0.40
+0.20 RG. SERBA GUNA
06 05 04 03 02 01 VOYER +4.05
±0.00
+0.05
01 01 01
1 00
1 00
100
91 84 84 91
200 150 200 91 84 84 91 350 350 75 125 350 350
1600 1600
F E D C B A F E D
A
LEMBAR BACK UP DATA
PERHITUNGAN VOLUME
PEKERJAAN : PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI : GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN : 2022
A
F E D C B A
1600
75 125 150 200 100 250 350 350
06 06
K6 K5 K4 K3 K2 K1 K2 K3 K4 K5 K6
224.5 116.6 116.6 116.6 116.6 116.6 116.6 116.6 116.6 116.6 116.6 224.5
350
350
+13.31
05 05
421
90
RingBalk 25/35 Beton Bertulang
Mutu K-225
350
1 .0
40 0
1850
1 85 0
Mutu K-225
175
KM/WC
+4.00 RG. PERTEMUA N RG. LOBB Y Balok Lanta i 30 /40 Beton Bertulang
+4.05 +4.05 Mutu K-225
03 03
+4.00
350
Ø 10 - 15
Uk. 4 x 4 x 2,5 mm
LOBBY PLA FOND
Ø8 -15
4 10
40 0
Camp. 1pc:4psr
-0.60
45
350
350
80
LOBBY 85 85
30
+4.05
105 105 10
01 01 30
100
100
-3.20
175 10
A
LEMBAR BACK UP DATA
PERHITUNGAN VOLUME
PEKERJAAN : PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI : GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN : 2022
K6 K5 K4 K3 K2 K1 K2 K3 K4 K5 K6 K1
Tiang Kuda-Kuda CT.75
K6 K5 K4 K3 K2 K1 K2 K3 K4
224.5 K5
116.6 K6
116.6 116.6 116.6 116.6 116.6 116.6 116.6 116.6 116.6 224.5 K1
Tiang Kuda-Kuda CT.75 Kaki Kuda-Kuda CT.75
224.5 116.6 116.6 116.6 116.6 116.6
+13.31 116.6 116.6 116.6 116.6 116.6 224.5 +13.31 Skor CT.75
Kaki Kuda-Kuda CT.75
+13.31 Skor CT.75 Skor CT.75
Skor CT.75
Skor CT.75 Atap Metal "Multy roof"
Skor CT.75
Atap Metal "Multy roof"
4 21
4 21
Reng A.45
90 90
42 1
1 10
RingBalk 25/40 Beton Bertulang List Profil Exterior RingBalk 25/40 Beton Ber
+8.00 Mutu K-225 +8.00 Mutu K-225
List Profil Exterior RingBalk 25/40 Beton Bertulang
Balok Latei 15/1 8 Beton Bertulang Pasanga n Dinding 1/2 Bat
Mutu K-225
+8.00 Mutu K-225
Camp. 1pc:5psr
+7.56Balok Late i 15/18 Beton Bertulang +7.56 +7.56 Pasangan Dinding 1/2 Bata +7.56
Plat Sunscreen tebal 10c m Beton Bertulang Balok Latei 15/18 Beton Plat Sunscreen tebal 10
PLAFONDMutu K-225 PLA FOND Mutu K-225 PLA FOND Camp. 1pc:5psr PLAFOND Mutu K-225
+7.56 +7.56 0.8
+7.56 Bertulang Mutu K-225 +7.56
Plat Sunscreen tebal 10cm Beton Bertulang Plat Sunscreen tebal 10cm Beton Bertulang
1.0
PLAFOND PLA FOND Balok Latei 15/18 Beton PLAFOND PLAFOND Jendela Type (J3)
4 00
4 00
Mutu K-225
Plat Lantai tebal 12 cm Beton Bertulang Tegel WC/KM 25/40
Mutu K-225
RG. PERTEMUAN RG. L OBB Y Balok Lantai 30/40 Beton Bertulang K M/WC RG. P ERTEMUA N RG. PERTEMUAN
+4.05 +4.05 Mutu K-225 +4.00 +4.05 +4.05 Balok Lantai 30/40 Beton
RG. PERTEMUA N RG. LOBB Y Balok Lantai 30/40 Beton Bertulang K M/WC RG. PERTEMUAN RG. PERTEMUAN Mutu K-225
+4.00
+4.05 +4.05 Mutu K-225 +4.00 +4.05+4.00 +4.05 Balok Lantai 30/40 Beton Bertulang
Pasanga n Dinding 1/2 Bat
Balok Latei 15/18 Beton Mutu K-225
+4.00 Camp. 1pc:5psr
Bertulang Mutu K-225
Pasangan Dinding 1/2 Bata
Rangka Hollow Besi Galvanis Balok Latei 15/18 Beton Exhaust Wc/Km Camp. 1pc:5psr Plat Sunscreen tebal 10
+3.28 Bertulang Mutu K-225
+3.28 Mutu K-225
Ø 10 - 1 5
Uk. 4 x 4 x 2,5 mm Ø 10 - 15
4 00
Ø1 0 - 15
Uk. 4 x 4 x 2,5 mm Cover ACP (Alcopan)
Ø 10 - 15
Mutu K-225
PLAFOND PLAFOND
Ø 8 - 15 Ø 8 - 15
Tegel WC/KM 25/40
Alumunium Composite Jendela Type (J3)
40 0
60
75
Camp. 1pc:4psr Camp. 1pc:4psr
-0.60 Pas. Pondasi Batu Kali ±0.00 -0.60 Pas. Pondasi Batu Kali
45
60
80
80
-0.60
45
80
80
80
2 60
2 60
85 85 85 85
30
26 0
10 10
-3.20
105 105 10
30 105 -3.20
105 10
30
30 175 10 30 175 10
-3.20
350 350 175 350
10 350 350 350 300 175 10
600 350
350 350 350 350 350 350 300 600 F 350 D B A
1750
F D B A
1750 06 05 04 03 02 01
06 05 04 03 02 01
+0.05 +0.05 +0.05 ±0.00 Mutu K-225 ±0.00 75 +0.05 +0.05 +0.05 +0.05
Pas. Pondasi Batu Kali ±0.00 Pas. Pondasi Batu Kali
60
Camp. 1pc:4psr Camp. 1pc:4psr
-0.60
45
80
80
80
26 0
85 85 85 85
30
105 105 10
105 105 10
30 30
-3.20
175 10 175 10
350 350 350 350 350 350 300 600 350
F D B A
1750
06 05 04 03 02 01
06 06
Granite tile
Granite tile Granite tile 60 x 60
350
350
+0.05
60 x 60 60 x 60
+0.05 +0.05
05 05
Granite tile
Granite tile Granite tile
350
350
60 x 60
60 x 60 60 x 60 +0.05
+0.05 +0.05
04 04
SH A FT 02
Granite tile
175
60 x 60
+0.05 Granite tile Granite tile
350
60 x 60 60 x 60
1 8 50
18 5 0
Keramik
SH A FT 01
+0.05 +0.05
175
25 x 25
±0.00
03 03
Keramik Keramik
200
Granite tile 25 x 25 25 x 25
±0.00 ±0.00
60 x 60
350
+0.05
+2.20
150
+2.00
Granite tile
350
350
+0.40
+0.20
60 x 60
±0.00
+0.05
01 01
100
100
Gambar rencana
200 150 200 91 84 84 91 350 350 Denah Tegel Keramik Lt. 1
1600 Skala 1 : 100
F E D C B A
LEMBAR BACK UP DATA
PERHITUNGAN VOLUME
PEKERJAAN : PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI : GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN : 2022
06 06
350
350
05 05
350
+4.05 +4.05
04 04
SHAF T 02
Keramik
175
25 x 25
+4.00
350
18 50
185 0
Keramik
SHAF T 01
175
25 x 25
+4.00
03 03
Granite tile
Granite tile 60 x 60
+2.45
350
350
60 x 60
41 0
+4.05
+2.60 +2.20
+2.80 +2.00
+3.00 +1.80
+3.20 +1.60
02 +3.40 +1.40
02
+3.60 +1.20
+3.80
Granite tile
350
350
60 x 60
+4.05 Granite tile
60 x 60
+4.05
01 01
100
100
Gambar rencana
91 84 84 91
75 125 350 350 350 350 Denah Tegel Keramik Lt. 2
1600 Skala 1 : 150
F E D C B A
LEMBAR BACK UP DATA
PERHITUNGAN VOLUME
PEKERJAAN : PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI : GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN : 2022
Keramik
S H A FT 01
25 x 25
±0.00
Keramik Keramik
25 x 25 25 x 25
±0.00 ±0.00
LEMBAR BACK UP DATA
PERHITUNGAN VOLUME
PEKERJAAN : PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI : GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN : 2022
Keramik
25 x 25
+4.00
S H A FT 01
Keramik
25 x 25
+4.00
LEMBAR BACK UP DATA
PERHITUNGAN VOLUME
PEKERJAAN : PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI : GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN : 2022
+2.05
Pas. Dinding 1/2 Bata
Camp. 1pc:5psr
4 3,1
RG. STAF
+0.05 Spesi tebal 5 cm Pas. Tegel 25/25
Cor Lantai Beton tebal 7 cm Mutu K-175
Sloof 25/35 (SL) Beton Bertulang
Mutu K-225
±0.00
-0.07
10 7
-0.17
43
-0.60
45
45
45
45
35
35
35 35 35
65 65 65
85 85 85
175 175
LEMBAR BACK UP DATA
PERHITUNGAN VOLUME
PEKERJAAN : PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI : GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN : 2022
KM/WC
+4.00
50
350
350
DAPUR
D E T. LE M A RI B A W AH - 02
T IN G G I M E J A B E T O N 8 5 C M
+0.05
125
Pas. Dinding 1/2 Bata Tinggi 77 cm
235
Pas. Dinding 1/2 Bata Tinggi 67 cm
300
LEMBAR BACK UP DATA
PERHITUNGAN VOLUME
PEKERJAAN : PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI : GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN : 2022
kali
JUMLAH = 0.00 1.45 0.00 2
VOLUME BERSIH 2.91 m2
Sketsa :
350
50
350
DE T. LE M A R I B A W AH - 02
DAPUR
T IN G G I M E J A B E T O N 8 5 C M
+0.05
125
Pas. Dinding 1/2 Bata Tinggi 77 cm
235
Pas. Dinding 1/2 Bata Tinggi 67 cm
300
LEMBAR BACK UP DATA
PERHITUNGAN VOLUME
PEKERJAAN : PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI : GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN : 2022
285
235 50 5 175
75 85 85
57 57 67
5 5 5 5 5
7
10 10 10
43 43 43
45 45 45
80 80 80
30 30 30
5 5 5
300 350
LEMBAR BACK UP DATA
PERHITUNGAN VOLUME
PEKERJAAN : PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI : GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN : 2022
50
350
350
DAPUR
+0.05
175
235
300
LEMBAR BACK UP DATA
PERHITUNGAN VOLUME
PEKERJAAN : PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI : GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN : 2022
01 01 02 01 01
195
195
260
260
25 0
25 0
Ø19 - 15 Ø19 - 15
10
10
30
30
Ø19 - 15 Ø19 - 15
5 10
5 10
Cor Lantai Kerja Mutu K-175 Cor Lantai Kerja Mutu K-175
Lapisan Pasir Urug Lapisan Pasir Urug
10 175 10 10 175 10
195 195
350
B01 A01
LEMBAR BACK UP DATA
PERHITUNGAN VOLUME
PEKERJAAN : PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI : GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN : 2022
06 06
Granite tile
60 x 60
350
+0.05
60 x 60 60 x 60
+0.05 +0.05
05 05
Granite tile
Granite tile Granite tile
350
60 x 60
3 50
60 x 60 60 x 60 +0.05
+0.05 +0.05
04 04
S HA FT 0 2
Granite tile
175
60 x 60
+0.05 Granite tile Granite tile
3 50
60 x 60 60 x 60
18 5 0
18 5 0
Keramik
S HA FT 01
+0.05 +0.05
175
25 x 25
±0.00
03 03
Keramik Keramik
2 00
Granite tile 25 x 25 25 x 25
±0.00 ±0.00
60 x 60
350
+0.05
+2.20
1 50
+2.00
Granite tile
350
3 50
+0.40
+0.20
60 x 60
±0.00
+0.05
01 01
100
1 00
Gambar rencana
200 150 200 91 84 84 91 350 350 Denah Tegel Keramik Lt. 1
1600 Skala 1 : 100
F E D C B A
LEMBAR BACK UP DATA
PERHITUNGAN VOLUME
PEKERJAAN : PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI : GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN : 2022
29. Pek. Cor Beton PoorPlat 175 x 175 cm t=30cm K225 Type P-1
Lebar 1 Lebar 2 Tinggi Jumlah Panjang (m1) Luas (m2) Vp (m3)
No Ket
(m) (m) (m) (bh) a+b+c+d axb (a x b x c ) x d
P-1 0.35 0.35
0.10 30 2.70
1.75 1.75
1.75 1.75 0.3 30 15.00
01 01 02 01 01
195
195
260
260
25 0
250
Ø19 - 15 Ø19 - 15
10
10
30
30
Ø19 - 15 Ø19 - 15
5 10
5 10
Cor Lantai Kerja Mutu K-175 Cor Lantai Kerja Mutu K-175
Lapisan Pasir Urug Lapisan Pasir Urug
10 175 10 10 175 10
195 195
350
B01 A01
LEMBAR BACK UP DATA
PERHITUNGAN VOLUME
PEKERJAAN : PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI : GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN : 2022
30. Pek. Cor Beton PoorPlat 175 x 175 cm t=30cm K225 Type P-1
Lebar 1 Lebar 2 Tinggi Jumlah Panjang (m1) Luas (m2) Vp (m3)
No Ket
(m) (m) (m) (bh) a+b+c+d axb (a x b x c ) x d
P-1 0.35 0.35
0.10 2 0.19
1.75 1.75
1.75 1.75 0.3 2 1.09
01 01 02 01 01
195
195
260
260
250
25 0
Ø19 - 15 Ø19 - 15
10
10
30
30
Ø19 - 15 Ø19 - 15
5 10
5 10
Cor Lantai Kerja Mutu K-175 Cor Lantai Kerja Mutu K-175
Lapisan Pasir Urug Lapisan Pasir Urug
10 175 10 10 175 10
195 195
350
B01 A01
LEMBAR BACK UP DATA
PERHITUNGAN VOLUME
PEKERJAAN : PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI : GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN : 2022
. K1 . K1 . K1 . K1 . K1 06
SL 25/35 SL 25/35 SL 25/35 SL 25/35
S L 2 5 /3 5
S L 2 5 /3 5
S L 25/35
S L 25/35
S L25/35
350
S L 2 5 /3 5
S L 25/35
350
350
S L 2 5 /3 5
S L 25/35
S L 2 5 /3 5
1750
350
SL 25/35 SL 25/35
200
S L 25/35
S L2 5/35
350
SL 25/35 SL 25/35
. K1 . K2 . K1 . K1 02
S L 25/35
S L 25/35
175
S L 25/35
S L 2 5 /3 5
SL 25/35
350
175
K4 K4 K4
SL 25/35 SL 25/35 SL 25/35
. K1 . K1 . . . . K1 . K1 . K1 01
100
SL 25/35 SL 25/35
93 83 83 92
200 150 200 350 350 350
F E D C B A
LEMBAR BACK UP DATA
PERHITUNGAN VOLUME
PEKERJAAN : PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI : GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN : 2022
32. Pek. Kolom Beton Bertulang 35/35 mutu K225 Type K-1
Lebar 1 Lebar 2 Tinggi Jumlah Panjang (m1) Luas (m2) Vp (m3)
No Ket
(m) (m) (m) (bh) a+b+c+d axb (a x b x c ) x d
1 0.35 0.35 5.60 28 19.21
. K1 . K1 . K1 . K1 . K1 06
SL 25/35 SL 25/35 SL 25/35 SL 25/35 S L 2 5 /3 5
S L 2 5 /3 5
S L 2 5 /3 5
S L 2 5 /3 5
S L 2 5 /3 5
350
350
SL 25/35 SL 25/35 SL 25/35
. K1 . K1 . K1 . K2 . K1 05
S L 2 5 /3 5
S L 2 5 /3 5
S L 2 5 /3 5
S L 2 5 /3 5
S L 2 5 /3 5
350
350
S L 2 5 /3 5
S L 2 5 /3 5
S L 2 5 /3 5
1750
350
SL 25/35 SL 25/35
200
S L 2 5 /3 5
S L 2 5 /3 5
350
SL 25/35 SL 25/35
. K1 . K2 . K1 . K1 02
S L 2 5 /3 5
S L 2 5 /3 5
175
S L 2 5 /3 5
S L 2 5 /3 5
SL 25/35
350
175
K4 K4 K4
SL 25/35 SL 25/35 SL 25/35
. K1 . K1 . . . . K1 . K1 . K1 01
100
SL 25/35 SL 25/35
93 83 83 92
200 150 200 350 350 350
F E D C B A
LEMBAR BACK UP DATA
PERHITUNGAN VOLUME
PEKERJAAN : PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI : GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN : 2022
33. Pek. Kolom Beton Bertulang 35/35 mutu K225 Type K-2
Lebar 1 Lebar 2 Tinggi Jumlah Panjang (m1) Luas (m2) Vp (m3)
No Ket
(m) (m) (m) (bh) a+b+c+d axb (a x b x c ) x d
1 0.35 0.35 5.60 6 4.12
. K1 . K1 . K1 . K1 . K1 06
SL 25/35 SL 25/35 SL 25/35 SL 25/35 S L 2 5 /3 5
S L 2 5 /3 5
S L 2 5 /3 5
S L 2 5 /3 5
S L 2 5 /3 5
350
350
SL 25/35 SL 25/35 SL 25/35
. K1 . K1 . K1 . K2 . K1 05
S L 2 5 /3 5
S L 2 5 /3 5
S L 2 5 /3 5
S L 2 5 /3 5
S L 2 5 /3 5
350
350
S L 2 5 /3 5
S L 2 5 /3 5
S L 2 5 /3 5
1750
350
SL 25/35 SL 25/35
200
S L 2 5 /3 5
S L 2 5 /3 5
350
SL 25/35 SL 25/35
. K1 . K2 . K1 . K1 02
S L 2 5 /3 5
S L 2 5 /3 5
175
S L 2 5 /3 5
S L 2 5 /3 5
SL 25/35
350
175
K4 K4 K4
SL 25/35 SL 25/35 SL 25/35
. K1 . K1 . . . . K1 . K1 . K1 01
100
SL 25/35 SL 25/35
93 83 83 92
200 150 200 350 350 350
F E D C B A
LEMBAR BACK UP DATA
PERHITUNGAN VOLUME
PEKERJAAN : PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI : GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN : 2022
34. Pek. Kolom Beton Bertulang 35/35 mutu K225 Type K-3
Lebar 1 Lebar 2 Tinggi Jumlah Panjang (m1) Luas (m2) Vp (m3)
No Ket
(m) (m) (m) (bh) a+b+c+d axb (a x b x c ) x d
1 0.35 0.35 5.10 20 12.50
2 0.35 0.35 4.00 7.00 3.43
R B -32 5 /4 0
350
350
K3 K3
. . 05
R B -32 5 /4 0
R B -32 5 /4 0
350
350
K3 K3 K3
RB-4 25/35
. .KP . .KP . 04
175
R B -42 5 /3 5
R B -32 5 /4 0
R B -42 5 /3 5
R B -32 5 /4 0
1750
RB-4
350
K3 K3 K3 K3 K3 K3
. .KP . .KP . . . . 03
RB-4 25/35 RB-3 25/40 RB-3 25/40 RB-3 25/40 RB-3 25/40
R B -32 5 /4 0
R B - 32 5 / 4 0
R B -32 5 /4 0
350
350
K3 K3 K3 K3
RB-1 25/40 RB-1 25/40
. .KP . . . 02
RB-2 25/40 RB-2 25/40
R B -22 5 /4 0
R B -22 5 / 4 0
R B - 22 5 / 4 0
R B -22 5 /4 0
R B -22 5 /4 0
350
350
K3 K3 K3 K3 K3
RB-2 25/40 RB-2 25/40 RB-2 25/40 RB-2 25/40
. . . . . 01
100
1600 1600
75 35 90 150 200 100 250 350 175 175
75 125 150 200 100 250 350 350
K3 K3 K3 K3 K3
. K1 . K1 . K1 . K1 . K1 06 . . . . . 06
SL 25/35 SL 25/35 SL 25/35 SL 25/35 RB-3 25/40 RB-3 25/40 RB-3 25/40 RB-3 25/40
S L 2 5 /3 5
R B - 32 5 / 4 0
R B - 32 5 / 4 0
S L 2 5/35
S L 2 5 /3 5
S L 2 5/35
S L2 5/35
350
350
350
350
K3 K3
SL 25/35 SL 25/35 SL 25/35
. K1 . K1 . K1 . K2 . K1 05 . . 05
S L 2 5 /3 5
S L 2 5 /3 5
R B - 32 5 / 4 0
R B - 32 5 / 4 0
S L 2 5/35
SL 2 5/35
S L 2 5 /3 5
350
350
350
35 0
175
S L 2 5/35
S L 2 5 /3 5
S L 2 5 /3 5
R B - 42 5 /3 5
R B - 32 5 / 4 0
R B -42 5 / 3 5
R B - 32 5 / 4 0
17 5 0
1 75 0
RB-4
350
350
KP. .KP .KP .KP .KP.KP .KP .KP
175
175
SL 25/35 SL 25/35 RB-4 25/35 RB-3 25/40 RB-3 25/40 RB-3 25/40 RB-3 25/40
200
R B - 32 5 / 4 0
R B -32 5 / 4 0
R B - 32 5 / 4 0
S L 2 5 /3 5
S L2 5 /3 5
35 0
350
350
.KP .KP .KP
SL 25/35
150
SL 25/35 SL 25/35 K3 K3 K3 K3
RB-1 25/40 RB-1 25/40
. K1 . K2 . K1 . K1 02 . .KP . . . 02
S L 2 5 /3 5
R B - 22 5 /4 0
175
S L 2 5 /3 5
R B -22 5 / 4 0
R B -22 5 / 4 0
R B - 22 5 / 4 0
R B - 22 5 / 4 0
S L 2 5 /3 5
SL 25/35
35 0
350
350
175
K4 K4 K4 K3 K3 K3 K3 K3
SL 25/35 SL 25/35 SL 25/35 RB-2 25/40 RB-2 25/40 RB-2 25/40 RB-2 25/40
. K1 . K1 . . . . K1 . K1 . K1 01 . . . . . 01
100
100
SL 25/35 SL 25/35
93 83 83 92 .KP .KP .KP
RB-2 25/40 RB-2 25/40
200 150 200 350 350 350 75 125 350 350 350 350
F E D C B A F E D C B A
LEMBAR BACK UP DATA
PERHITUNGAN VOLUME
PEKERJAAN : PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI : GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN : 2022
36. Pek. Balok Latei Beton Bertulang 15/18 mutu K225 Type BT Lantai 1
Lebar 1 Lebar 2 Panjang Jumlah Panjang (m1) Luas (m2) Vp (m3)
No Ket
(m) (m) (m) (bh) a+b+c+d axb (a x b x c ) x d
Lantai 1 0.15 0.18 3.50 19 1.80
0.15 0.18 3.00 1 0.08
0.15 0.18 2.50 1 0.07
0.15 0.18 1.75 2 0.09
0.15 0.18 1.50 1 0.04
07
BT 15/18 BT 15/18 BT 15/18
Elv.+2.68 Elv.+2.68 Elv.+2.68
350
350 06
BT 15/18 BT 15/18 BT 15/18
Elv.+2.33 Elv.+2.33 Elv.+2.33
B T 1 5 /1 8
B T 1 5 /1 8
B T 1 5 /1 8
E lv .+ 2.68
E lv.+ 2.33
E lv .+2.6 8
350
350
300
B T 1 5 /1 E8 lv.+2 .6 8
04
B T 1 5 /1 8
BT 15/18
E lv .+ 2.33
B T 1 5 /1 8
175
Elv.+2.33
E lv .+2 .68
1750
350
B T 1 5 /1 8
E lv .+2 .68
175
250
150
03
B T 1 5 /1 8
E lv .+2.6 8
150
02
BT 15/18
Elv.+2.68
B T 1 5 /1 8
B T 1 5 /1 8
E lv .+2 .68
E lv .+ 2.68
350
350
01
100
BT 15/18
Elv.+2.68
93 83 83 92
200 150 200 350 350 350
F E D C B A
GAMBAR RENCANA
Denah Balok Latei (Elv.+2.33 / Elv.+2.68)
SKALA 1 : 100
LEMBAR BACK UP DATA
PERHITUNGAN VOLUME
PEKERJAAN : PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI : GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN : 2022
37. Pek. Balok Latei Beton Bertulang 15/18 mutu K225 Type BT Lantai 2
Lebar 1 Lebar 2 Panjang Jumlah Panjang (m1) Luas (m2) Vp (m3)
No Ket
(m) (m) (m) (bh) a+b+c+d axb (a x b x c ) x d
Lantai 2 0.15 0.18 3.50 15 1.42
0.15 0.18 3.00 1 0.08
06
B T 1 5 /1 8
B T 1 5 /1 8
E l v.+6 .68
E l v.+6 .68
350
350
05
B T 1 5 /1 8
B T 1 5 /1 8
E l v.+6 .68
E l v.+6 .68
350
350
04
175
B T 1 5 /1 8
B T 1 5 /1 8
B T 1 5 /1 8
E lv .+ 6.6 8
E lv .+ 6.3 3
E lv.+6 .68
1750
350
175
BT 15/18 BT 15/18
03
Elv.+6.68 Elv.+6.68
B T 1 5 /1 8
E lv.+6 .68
350
350
02
B T 1 5 /1 8
B T 1 5 /1 8
E lv .+ 6.6 8
E l v.+6 .68
350
350
01
100
BT 15/18 BT 15/18
93 83 83 92
Elv.+6.68 Elv.+6.68
200 150 200 350 350 350
F E D C B A
GAMBAR RENCANA
Denah Balok Latei (Elv.+6.33 / Elv.+6.68)
SKALA 1 : 100
LEMBAR BACK UP DATA
PERHITUNGAN VOLUME
PEKERJAAN : PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI : GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN : 2022
38. Pek. Balok Lantai Beton Bertulang 30/40 mutu K225 Type BL-1
Lebar 1 Lebar 2 Panjang Jumlah Panjang (m1) Luas (m2) Vp (m3)
No Ket
(m) (m) (m) (bh) a+b+c+d axb (a x b x c ) x d
Lantai 2 0.30 0.40 3.50 23 9.66
0.30 0.40 1.00 3 0.36
07
BL-1 30/40 BL-1 30/40 BL-1 30/40 BL-1 30/40
B L -23 0 /4 0
B L -23 0 / 4 0
B L - 23 0 / 4 0
B L - 13 0 /4 0
B L - 13 0 /4 0
350
350
BL-2 30/40 BL-2 30/40 BL-2 30/40 BL-2 30/40
06
B L - 23 0 /4 0
B L - 23 0 / 4 0
B L - 13 0 /4 0
B L - 13 0 /4 0
350
350
B L - 23 0 / 4 0
B L -42 5 / 3 5
B L - 42 5 /3 5
B L - 13 0 /4 0
B L - 42 5 / 3 5
B L - 13 0 /4 0
1750
BL-4 BL-4
350
175
03
BL-4 25/35 BL-2 30/40 BL-2 30/40 BL-2 30/40 BL-2 30/40
B L -23 0 /4 0
B L - 13 0 /4 0
B L -33 0 / 4 0
B L - 23 0 / 4 0
B L - 13 0 /4 0
350
350
Area
Tangga
BL-3 30/40 BL-3 30/40
02
80
B L -23 0 /4 0
B L - 23 0 / 4 0
B L - 13 0 /4 0
B L - 13 0 /4 0
350
270
39. Pek. Balok Lantai Beton Bertulang 30/40 mutu K225 Type BL-2
Lebar 1 Lebar 2 Panjang Jumlah Panjang (m1) Luas (m2) Vp (m3)
No Ket
(m) (m) (m) (bh) a+b+c+d axb (a x b x c ) x d
Lantai 2 0.30 0.40 3.50 19 7.98
0.30 0.40 5.25 2 1.26
0.30 0.40 4.50 2 1.08
0.30 0.40 4.76 1 0.57
0.30 0.40 4.74 1 0.57
0.30 0.40 2.50 1 0.30
07
BL-1 30/40 BL-1 30/40 BL-1 30/40 BL-1 30/40
B L -23 0 /4 0
B L - 23 0 / 4 0
B L - 23 0 / 4 0
B L -13 0 /4 0
B L - 13 0 /4 0
350
350
BL-2 30/40 BL-2 30/40 BL-2 30/40 BL-2 30/40
06
B L -23 0 /4 0
B L - 23 0 / 4 0
B L -13 0 /4 0
B L - 13 0 /4 0
350
350
B L - 23 0 / 4 0
B L -42 5 /3 5
B L - 42 5 / 3 5
B L -13 0 /4 0
B L - 42 5 / 3 5
B L - 13 0 /4 0
1750
BL-4 BL-4
350
175
03
BL-4 25/35 BL-2 30/40 BL-2 30/40 BL-2 30/40 BL-2 30/40
B L -23 0 /4 0
B L -13 0 /4 0
B L - 33 0 / 4 0
B L - 23 0 / 4 0
B L - 13 0 /4 0
350
350
Area
Tangga
BL-3 30/40 BL-3 30/40
02
80
B L -23 0 /4 0
B L - 23 0 / 4 0
B L -13 0 /4 0
B L - 13 0 /4 0
350
270
40. Pek. Balok Lantai Beton Bertulang 30/40 mutu K225 Type BL-3
Lebar 1 Lebar 2 Panjang Jumlah Panjang (m1) Luas (m2) Vp (m3)
No Ket
(m) (m) (m) (bh) a+b+c+d axb (a x b x c ) x d
Lantai 2 0.30 0.40 3.50 4 1.68
07
BL-1 30/40 BL-1 30/40 BL-1 30/40 BL-1 30/40
B L - 23 0 /4 0
B L -23 0 / 4 0
B L - 23 0 / 4 0
B L -13 0 /4 0
B L -13 0 /4 0
350
350
BL-2 30/40 BL-2 30/40 BL-2 30/40 BL-2 30/40
06
B L - 23 0 /4 0
B L -23 0 / 4 0
B L -13 0 /4 0
B L -13 0 /4 0
350
350
BL-4 25/35 BL-2 30/40
05
04
BL-2 30/40 BL-2 30/40
B L - 23 0 /4 0
175
B L -23 0 /4 0
B L -13 0 /4 0
B L - 42 5 / 3 5
B L - 42 5 / 3 5
B L -13 0 /4 0
B L - 42 5 / 3 5
1750
BL-4 BL-4
350
175
03
BL-4 25/35 BL-2 30/40 BL-2 30/40 BL-2 30/40 BL-2 30/40
B L - 23 0 /4 0
B L -13 0 /4 0
B L -13 0 /4 0
B L -33 0 / 4 0
B L - 23 0 / 4 0
350
350
Area
Tangga
BL-3 30/40 BL-3 30/40
02
80
B L - 23 0 /4 0
B L - 23 0 / 4 0
B L -13 0 /4 0
B L -13 0 /4 0
350
270
41. Pek. Balok Lantai Beton Bertulang 25/35 mutu K225 Type BL-4
Lebar 1 Lebar 2 Panjang Jumlah Panjang (m1) Luas (m2) Vp (m3)
No Ket
(m) (m) (m) (bh) a+b+c+d axb (a x b x c ) x d
Lantai 2 0.25 0.35 3.50 3 0.92
Km/Wc 0.25 0.35 2.00 2 0.35
07
BL-1 30/40 BL-1 30/40 BL-1 30/40 BL-1 30/40
B L - 23 0 /4 0
B L - 23 0 / 4 0
B L -23 0 / 4 0
B L -13 0 /4 0
B L -13 0 /4 0
350
350
BL-2 30/40 BL-2 30/40 BL-2 30/40 BL-2 30/40
06
B L -23 0 /4 0
B L -23 0 / 4 0
B L -13 0 /4 0
B L -13 0 /4 0
350
350
B L - 23 0 /4 0
B L -42 5 /3 5
B L - 42 5 / 3 5
B L -13 0 /4 0
B L - 42 5 / 3 5
B L -13 0 /4 0
1750
BL-4 BL-4
350
175
03
BL-4 25/35 BL-2 30/40 BL-2 30/40 BL-2 30/40 BL-2 30/40
B L -13 0 /4 0
B L - 33 0 /4 0
B L - 23 0 / 4 0
B L -23 0 / 4 0
B L -13 0 /4 0
350
350
Area
Tangga
BL-3 30/40 BL-3 30/40
02
80
B L - 23 0 / 4 0
B L -23 0 / 4 0
B L -13 0 /4 0
B L -13 0 /4 0
350
270
42. Pek. Ringbalk Beton Bertulang 25/40 mutu K225 Type RB-1
Lebar 1 Lebar 2 Panjang Jumlah Panjang (m1) Luas (m2) Vp (m3)
No Ket
(m) (m) (m) (bh) a+b+c+d axb (a x b x c ) x d
1 0.25 0.40 3.50 2 0.70
R B -32 5 /4 0
3 50
350
K3 K3
. . 05
R B -32 5 / 4 0
R B -32 5 /4 0
3 50
350
K3 K3 K3
RB-4 25/35
. .KP . .KP . 04
1 75
R B -42 5 /3 5
R B -32 5 /4 0
R B -42 5 / 3 5
R B -32 5 /4 0
175 0
RB-4
350
K3 K3 K3 K3 K3 K3
. .KP . .KP . . . . 03
RB-4 25/35 RB-3 25/40 RB-3 25/40 RB-3 25/40 RB-3 25/40
R B -32 5 / 4 0
R B -32 5 / 4 0
R B -32 5 /4 0
3 50
350
K3 K3 K3 K3
RB-1 25/40 RB-1 25/40
. .KP . . . 02
RB-2 25/40 RB-2 25/40
R B -22 5 /4 0
R B -22 5 / 4 0
R B -22 5 / 4 0
R B -22 5 / 4 0
R B -22 5 /4 0
3 50
350
K3 K3 K3 K3 K3
RB-2 25/40 RB-2 25/40 RB-2 25/40 RB-2 25/40
. . . . . 01
100
43. Pek. Ringbalk Beton Bertulang 25/40 mutu K225 Type RB-2
Lebar 1 Lebar 2 Panjang Jumlah Panjang (m1) Luas (m2) Vp (m3)
No Ket
(m) (m) (m) (bh) a+b+c+d axb (a x b x c ) x d
1 0.25 0.40 3.50 13 4.55
2 0.25 0.40 1.00 3 0.30
350
K3 K3
. . 05
R B -32 5 /4 0
R B -32 5 /4 0
350
350
K3 K3 K3
RB-4 25/35
. .KP . .KP . 04
175
R B -42 5 /3 5
R B -32 5 /4 0
R B -32 5 /4 0
R B -42 5 /3 5
1750
RB-4
350
K3 K3 K3 K3 K3 K3
. .KP . .KP . . . . 03
RB-4 25/35 RB-3 25/40 RB-3 25/40 RB-3 25/40 RB-3 25/40
R B -32 5 /4 0
R B -32 5 /4 0
R B -32 5 /4 0
350
350
K3 K3 K3 K3
RB-1 25/40 RB-1 25/40
. .KP . . . 02
RB-2 25/40 RB-2 25/40
R B -22 5 /4 0
R B - 22 5 /4 0
R B -22 5 /4 0
R B -22 5 /4 0
R B -22 5 /4 0
350
350
K3 K3 K3 K3 K3
RB-2 25/40 RB-2 25/40 RB-2 25/40 RB-2 25/40
. . . . . 01
100
44. Pek. Ringbalk Beton Bertulang 25/40 mutu K225 Type RB-3
Lebar 1 Lebar 2 Panjang Jumlah Panjang (m1) Luas (m2) Vp (m3)
No Ket
(m) (m) (m) (bh) a+b+c+d axb (a x b x c ) x d
1 0.25 0.40 3.50 19 6.65
R B - 32 5 /4 0
350
350
K3 K3
. . 05
R B -32 5 /4 0
R B - 32 5 /4 0
350
350
K3 K3 K3
RB-4 25/35
. .KP . .KP . 04
175
R B -32 5 / 4 0
R B - 42 5 /3 5
R B -42 5 /3 5
R B - 32 5 /4 0
1750
RB-4
350
K3 K3 K3 K3 K3 K3
. .KP . .KP . . . . 03
RB-4 25/35 RB-3 25/40 RB-3 25/40 RB-3 25/40 RB-3 25/40
R B -32 5 /4 0
R B -32 5 /4 0
R B - 32 5 /4 0
350
350
K3 K3 K3 K3
RB-1 25/40 RB-1 25/40
. .KP . . . 02
RB-2 25/40 RB-2 25/40
R B - 22 5 /4 0
R B -22 5 /4 0
R B -22 5 /4 0
R B -22 5 /4 0
R B - 22 5 /4 0
350
350
K3 K3 K3 K3 K3
RB-2 25/40 RB-2 25/40 RB-2 25/40 RB-2 25/40
. . . . . 01
100
45. Pek. Ringbalk Beton Bertulang 25/35 mutu K225 Type RB-4 (Elv. +8.00)
Lebar 1 Lebar 2 Panjang Jumlah Panjang (m1) Luas (m2) Vp (m3)
No Ket
(m) (m) (m) (bh) a+b+c+d axb (a x b x c ) x d
1 0.25 0.35 3.50 3 0.92
2 0.25 0.35 2.00 2 0.35
R B -32 5 / 4 0
350
350
K3 K3
. . 05
R B - 32 5 /4 0
R B -32 5 / 4 0
350
350
K3 K3 K3
RB-4 25/35
. .KP . .KP . 04
175
R B -42 5 /3 5
R B -32 5 /4 0
R B -42 5 / 3 5
R B -32 5 / 4 0
1750
RB-4
350
K3 K3 K3 K3 K3 K3
. .KP . .KP . . . . 03
RB-4 25/35 RB-3 25/40 RB-3 25/40 RB-3 25/40 RB-3 25/40
R B - 32 5 /4 0
R B - 32 5 /4 0
R B -32 5 / 4 0
350
350
K3 K3 K3 K3
RB-1 25/40 RB-1 25/40
. .KP . . . 02
RB-2 25/40 RB-2 25/40
R B - 22 5 /4 0
R B - 22 5 /4 0
R B - 22 5 /4 0
R B - 22 5 /4 0
R B -22 5 / 4 0
350
350
K3 K3 K3 K3 K3
RB-2 25/40 RB-2 25/40 RB-2 25/40 RB-2 25/40
. . . . . 01
100
46. Pek. Ringbalk Beton Bertulang 25/35 mutu K225 Type RB-4 (Elv. +9.10)
panjang lebar Panjang jumlah Panjang (m1) Luas (m2) Vp (m3)
No Ket
(m) (m) (m) (m) a+b+c+d axb (a x b x c ) x d
1 0.25 0.35 3.50 23 7.04
R B - 42 5 /3 5
350
350
K3 K3
. . 05
R B - 42 5 / 3 5
R B - 42 5 / 3 5
350
350
K3 K3
. . 04
175
R B - 42 5 / 3 5
R B - 42 5 / 3 5
1750
350
175
K3 KP K3 K3 K3 K3
. . . . . . 03
RB-4 25/35 RB-4 25/35 RB-4 25/35 RB-4 25/35
R B - 42 5 /3 5
R B - 42 5 /3 5
R B - 42 5 /3 5
350
350
K3 KP K3 K3 K3
RB-4 25/35 RB-4 25/35
. . . . . 02
RB-4 25/35 RB-4 25/35
350
350
01
100
93 83 83 92
200 150 200 350 350 350
F E D C B A
LEMBAR BACK UP DATA
PERHITUNGAN VOLUME
PEKERJAAN : PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI : GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN : 2022
47. Pek. Cor Plat Lantai Beton Bertulang mutu K225 Tebal = 12cm
Lebar 1 Lebar 2 c d Panjang (m1) Luas (m2) Vp (m3)
No Tebal
(m) (m) (m) (m) a+b+c+d axb (a x b x c ) x d
Lantai 14.00 21.00 294.00
1 2.00 3.50 7.00
1.00 7.00 7.00
308.00
Kali
JUMLAH = 0.00 292.95 0.00 0.12
VOLUME BERSIH 35.15 m3
Sketsa : 1600
06
Ø12 - 15 Ø12 - 15 Ø12 - 15 Ø12 - 15
350
350
Ø12 - 15
Ø12 - 15
Ø12 - 15
Ø12 - 15
Ø12 - 15
Ø 12 - 15
Ø12 - 15
Ø12 - 15
Ø 12 - 15
Ø12 - 15
Ø 12 - 15
05
Ø12 - 15 Ø12 - 15 Ø12 - 15
Ø12 - 10 Ø12 - 10
Ø12 - 15 Ø12 - 15
350
350
Ø12 - 15
Ø12 - 15 Ø12 - 15
Ø12 - 15
Ø12 - 15
Ø12 - 15
Ø12 - 15
Ø12 - 15
Ø12 - 15
Ø12 - 15
Ø12 - 15
Ø12 - 15
Ø12 - 15
04
S h a ft S h a ft
Ø12 - 15
Ø12 - 15 Ø12 - 15 Ø12 - 15
175
Ø12 - 15
Ø12 - 15
Ø12 - 15 Ø12 - 15
1750
350
Ø12 - 15
Ø12 - 15 Ø12 - 15
Ø12 - 15 Ø12 - 15
175
Ø12 - 15
Ø12 - 15
Ø12 - 15
Ø12 - 15
Ø12 - 15
Ø12 - 15
Ø 12 - 15
Ø12 - 15
Ø12 - 15
Ø12 - 15
Ø12 - 15
Ø 1 2 - 15
Ø12 - 15
Ø12 - 15
Ø12 - 15
Ø 12 - 15
03
Ø12 - 15 Ø12 - 15
Ø12 - 10
Ø12 - 15
Area
350
350
Ø12 - 15
Ø12 - 15
Tangga
Ø12 - 15
+2.60 +2.20
+2.80 +2.00
+3.00 +1.80
+3.20 +1.60
+3.40 +1.40
02
80
+3.60 +1.20
Ø12 - 15
+3.80
Ø12 - 10
Ø12 - 15
Ø12 - 15
350
Ø12 - 15
Ø12 - 15
270
Ø12 - 15
Ø12 - 15
Ø12 - 15
Ø12 - 15
Ø12 - 15
Ø12 - 15
Ø12 - 15
Ø12 - 15
Ø12 - 10
Ø12 - 15
Ø12 - 15
Ø12 - 15
Ø12 - 10
Ø12 - 15
Ø12 - 15
Ø12 - 15
Ø12 - 15
01
100
Ø12 - 15 Ø12 - 15
Ø12 - 15 Ø12 - 15
93 83 83 92
200 150 200 350 350 350
F E D C B A
LEMBAR BACK UP DATA
PERHITUNGAN VOLUME
PEKERJAAN : PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI : GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN : 2022
48. Pek. Cor Plat Lantai Bordes Tangga Beton Bertulang mutu K225 Tebal = 12cm
Lebar 1 Lebar 2 c d Panjang (m1) Luas (m2) Vp (m3)
No Tebal
(m) (m) (m) (m) a+b+c+d axb (a x b x c ) x d
Bordes 3.50 2.00 7.00
Tangga
Kali
JUMLAH = 0.00 7.00 0.00 0.12
VOLUME BERSIH 0.84 m3
Sketsa :
144.2
GAMBAR RENCANA 20.0
Potongan A -A
SKALA 1 : 30 80.0 120.0
140.1
+3.80
+3.60
TUM PUAN
144.2
Ø10 - 15 Ø12 - 20
+3.40
99.5
Detail C
+3.20
+3.00
Ø12 - 20
+2.80
246 108.2
BORDES
+2.60
+2.40
Ø12 - 15 +2.40
Ø12 - 15
BEG EL Ø 10 - 20CM
30 +2.20
LAPANGAN
20
30
Ø10 - 15 144.2
+2.00
20 Ø8 - 15
30
198.5 +1.80
Detail B 04
Ø12 - 20
20
30
20 30
+1.60
+1.40
20
Ø8 - 15 30 +1.20
16.1
20 30
+1.00
BEG EL Ø 10 - 15CM
20 30 Ø10 - 15
369 +0.80
120.0
20
Ø12 - 20 30 +0.60
TU M PUAN
20
30 +0.40
87.5 175 87.5 87.5Ø8 - 15 175
99.5 TUMPUAN LAPANGAN TUMPUAN TUMPUAN 20
+0.20
Ø10 - 15CM BEGEL Ø10 - 20CM Ø10 - 15CM Ø10 - 15CM
25
45
80
80
30
30
2 50
Ø19 - 15
5
35
65
Ø19 - 15 85
Detail A
Cor Lantai Kerja Mutu K-175
5 10
49. Pek. Cor Plat Tangga Beton Bertulang mutu K225 Tebal = 10cm
Lebar 1 Lebar 2 Tebal Panjang (m1) Luas (m2) Vp (m3)
No Ket
(m) (m) (m) (m) a+b+c+d axb (a x b x c ) x d
Bordes 1.60 3.69 0.10 0.59
Tangga 1.60 2.46 0.10 0.39
144.2
GAMBAR RENCANA 20.0
Potongan A-A
80.0
SKALA 1 : 30 120.0
140.1
+3.80
+3.60
TUM PU AN
144.2
Ø10 - 15 Ø12 - 20
+3.40
99.5
Detail C
+3.20
+3.00
Ø12 - 20
+2.80
246 108.2
BORDES
+2.60
+2.40
Ø12 - 15 +2.40
Ø12 - 15
BEGEL Ø 10 - 20CM
30 +2.20
LAPA NGA N
20
30
Ø10 - 15 144.2
+2.00
20 30 Ø8 - 15
+1.80
198.5
Detail B 04
Ø12 - 20
20
30
20
30
+1.60
+1.40
20
Ø8 - 15 30 +1.20
16.1
20
30 +1.00
BEGEL Ø 10 - 15CM
20 30 Ø10 - 15
369 +0.80
120.0
20 30
Ø12 - 20 +0.60
TUM PUA N
20
30 +0.40
87.5 175 87.5 87.5Ø8 - 15 175
99.5 TUMPUAN LAPANGAN TUMPUAN TUMPUAN 20
+0.20
Ø10 - 15CM BEGEL Ø10 - 20CM Ø10 - 15CM Ø10 - 15CM
25
45
80
80
30
30
25 0
Ø19 - 15
5
35
65
Ø19 - 15 85
Detail A
Cor Lantai Kerja Mutu K-175
5 10
20
15
GAMBAR RENCANA
B es i H o llo w 50 x 50 /1,8 m m
20
30
Detail A
20
30 Ø10 - 15
SKALA 1 : 25
80
20
30
Ø12 - 20
Beton Mutu K-225
20
30
30
20
35
25
25
Timbunan Sirtu
45
45
80
30
5
35
65
85
LEMBAR BACK UP DATA
PERHITUNGAN VOLUME
PEKERJAAN : PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI : GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN : 2022
51. Pek. Cor Plat Dak/Atap Beton Bertulang mutu K225 Tebal = 10cm
Lebar 1 Lebar 2 Panjang (m1) Luas (m2) Vp (m3)
No Tebal
(m) (m) (m) (m) a+b+c+d axb (a x b x c ) x d
Atap 3.26 4.76 15.52
Dak 3.50 14.37 50.30
Beton 1.37 7.74 10.60
Kali
JUMLAH = 0.00 76.42 0.00 0.10
VOLUME BERSIH 7.64 m3
Sketsa : 1600
06
350
350
05
350
350
04
Ø12 - 15
175
Ø12 - 15
Ø12 - 15
1750
350
Ø12 - 15
175
Ø12 - 15
Ø12 - 15
Ø 12 - 15
Ø12 - 15
03
350
350
02
Ø12 - 15 Ø12 - 15 Ø12 - 15 Ø12 - 15
350
350
Ø 12 - 15
Ø 12 - 15
Ø12 - 15
Ø12 - 15
Ø12 - 15
Ø 12 - 15
Ø12 - 15
Ø 12 - 15
Ø12 - 15
Ø 12 - 15
Ø12 - 15
01
100
Ø12 - 15 Ø12 - 15
Ø12 - 15 Ø12 - 15
93 83 83 92
200 350 350 350 350
F E D C B A
LEMBAR BACK UP DATA
PERHITUNGAN VOLUME
PEKERJAAN : PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI : GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN : 2022
52. Pek. Plat Sunscreen Beton Bertulang mutu K225 Tebal = 10cm
Lebar 1 Lebar 2 Tebal Jumlah Panjang (m1) Luas (m2) Vp (m3)
No Ket
(m) (m) (m) (bh) a+b+c+d axb (a x b x c ) x d
Sunscreen
Lt.1 3.15 0.58 0.10 8 1.46
Lt.2 3.15 0.58 0.10 11 2.01
ventilasi
km/wc
Lt.1 3.15 0.58 0.10 1 0.18
1.75 0.58 0.10 1 0.10
Lt.2 3.15 0.58 0.10 1 0.18
1600 1600
75 35 90 150 200 100 250 350 175 175 200 150 200 100 250 350 350
07 06
BT 15/18 BT 15/18 BT 15/18
Elv.+2.68 El v.+2.68 Elv.+2.68
B T 1 5 /1 8
B T 1 5 /1 8
El v.+6 .68
El v .+6 .68
350
350
350
350
06 05
BT 15/18 BT 15/18 BT 15/18
Elv.+2.33 Elv.+2.33 Elv.+2.33
B T 1 5 /1 8
B T 1 5 /1 8
B T 1 5 /1 8
B T 1 5 /1 8
B T 1 5 /1 8
El v.+6 .68
El v .+6 .68
E lv .+2 .6 8
350
350
E l v.+2 .3 3
E lv.+2 .6 8
350
350
300
B T 1 5 /1 E8 lv .+2 .6 8
04 04
B T 1 5 /1 8
BT 15/18
E l v.+2 .33
175
B T 1 5 /1 8
175
Elv.+2.33
B T 1 5 /1 8
B T 1 5 /1 8
B T 1 5 /1 8
E lv.+2 .68
E l v.+6 .6 8
E l v.+ 6.3 3
El v .+6 .68
1750
350
1750
350
B T 1 5 /1 8
E lv .+2 .6 8
175
175
250
150 BT 15/18 BT 15/18
03 03
El v.+6.68 Elv.+6.68
B T 1 5 /1 8
El v.+6 .68
B T 1 5 /1 8
350
350
350
E lv.+2 .6 8
150
02
02
BT 15/18
Elv.+2.68
B T 1 5 /1 8
B T 1 5 /1 8
B T 1 5 /1 8
B T 1 5 /1 8
E l v.+6 .6 8
350
350
350
350
01
01
100
100
53. Pek. Plat Meja Dapur Beton Bertulang mutu K225 Tebal = 8cm
Lebar 1 Lebar 2 Tebal Jumlah Panjang (m1) Luas (m2) Vp (m3)
No Ket
(m) (m) (m) (bh) a+b+c+d axb (a x b x c ) x d
Meja 0.50 1.75 0.08 1 0.07
Dapur 0.50 2.35 0.08 1 0.09
300
350
50
350
DAPUR
+0.05
175
235
300
GAMBAR RENCANA
Denah Meja Dapur
SKALA 1 : 40
LEMBAR BACK UP DATA
PERHITUNGAN VOLUME
PEKERJAAN : PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI : GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN : 2022
06 06
350
350
05 05
350
RG. Ka. TU
350
04 04
S H A FT 02
175
GUDANG
+0.05
350
1850
S H A FT 01
+0.05 +0.05
175
KM/WC
±0.00
03 03
200
KM/WC KM/WC
±0.00 ±0.00
LOBBY
350
+0.05
+2.60 +2.20
150
+2.80 +2.00
+3.00 +1.80
+3.20 +1.60
350
+0.40
+0.20
VOYER
±0.00
+0.05
01 01
100
100
Gambar rencana
Denah Gedung
200 150 200 91 84 84 91 350 350
UPT. Balai Pelatihan
1600 KUKM Lt. 1
F E D C B A Skala 1 : 100
A
LEMBAR BACK UP DATA
PERHITUNGAN VOLUME
PEKERJAAN : PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI : GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN : 2022
224.5
K6
116.6
K5
116.6
K4
116.6
K3
116.6
283
K2
116.6
1615
P L A T B E T O N B E R TU L A N G
K1
116.6
K2
475
116.6
K3
116.6
K4
116.6
K5
283 116.6
K6
224.5
383
Gambar rencana
Denah Atap
Rangka Baja Ringan
& Reng
676 773 Skala 1 : 100
224.5 116.6 116.6 116.6 116.6 116.6 116.6 116.6 116.6 116.6 116.6 224.5
K6 K5 K4 K3 K2 K1 K2 K3 K4 K5 K6
LEMBAR BACK UP DATA
PERHITUNGAN VOLUME
PEKERJAAN : PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI : GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN : 2022
224.5
K6
116.6
K5
116.6
K4
116.6
K3
116.6
283
K2
116.6
1615
P L A T B E T O N B E R TU L A N G
K1
116.6
K2
475
116.6
K3
116.6
K4
116.6
K5
283 116.6
K6
224.5
383
Gambar rencana
Denah Atap
Rangka Baja Ringan
& Reng
676 773 Skala 1 : 100
224.5 116.6 116.6 116.6 116.6 116.6 116.6 116.6 116.6 116.6 116.6 224.5
K6 K5 K4 K3 K2 K1 K2 K3 K4 K5 K6
LEMBAR BACK UP DATA
PERHITUNGAN VOLUME
PEKERJAAN : PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI : GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN : 2022
224.5
K6
116.6
K5
116.6
K4
116.6
K3
116.6
283
K2
116.6
1615
P L A T B E T O N B E R TU L A N G
K1
116.6
K2
475
116.6
K3
116.6
K4
116.6
K5
283 116.6
K6
224.5
383
Gambar rencana
Denah Atap
Rangka Baja Ringan
& Reng
676 773 Skala 1 : 100
224.5 116.6 116.6 116.6 116.6 116.6 116.6 116.6 116.6 116.6 116.6 224.5
K6 K5 K4 K3 K2 K1 K2 K3 K4 K5 K6
LEMBAR BACK UP DATA
PERHITUNGAN VOLUME
PEKERJAAN : PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI : GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN : 2022
224.5
K6
116.6
K5
116.6
K4
116.6
K3
116.6
283
K2
116.6
1615
P L A T B E T O N B E R TU L A N G
K1
116.6
K2
475
116.6
K3
116.6
K4
116.6
K5
283 116.6
K6
224.5
383
Gambar rencana
Denah Atap
Rangka Baja Ringan
& Reng
676 773 Skala 1 : 100
224.5 116.6 116.6 116.6 116.6 116.6 116.6 116.6 116.6 116.6 116.6 224.5
K6 K5 K4 K3 K2 K1 K2 K3 K4 K5 K6
LEMBAR BACK UP DATA
PERHITUNGAN VOLUME
PEKERJAAN : PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI : GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN : 2022
06 06
350
350
350
04 04
175
Void
350
1850
1850
175
Void
03 03
200
350
150
Area Tangga
02 02
350
350
01 01
100
100
Gambar rencana
200 150 200 91 84 84
1600
91 350 350
Denah Plafond Lt. 1
F E D C B A
Skala 1 : 100
LEMBAR BACK UP DATA
PERHITUNGAN VOLUME
PEKERJAAN : PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI : GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN : 2022
06 06
3 50
3 50
05 05
3 50
3 50
04 04
1 75
Void
3 50
18 50
1850
1 75
Void
03 03
3 50
3 50
410
02 02
3 50
3 50
01 01
1 00
1 00
91 84 84 91 Gambar rencana
75 125 350 350
1600
350 350
Denah Plafond Lt. 2
F E D C B A
Skala 1 : 100
LEMBAR BACK UP DATA
PERHITUNGAN VOLUME
PEKERJAAN : PERENCANAAN REHABILITAS GEDUNG BALAI PENYULUHAN KB KECAMATAN DOLO BARAT
LOKASI : GEDUNG BALAI PENYULUHAN KB KEC. DOLO BARAT
TAHUN ANGGARAN : 2022
Gedung
UPT. Balai
Pelatihan KUKM
#REF!
9 Pek. Ringbalk Beton Bertulang 15/35 mutu K225 Type RB-3 1535
- Beton Mutu F'c = 19,3 Mpa (K 225) M³ 3.42 Rp 30,514,685.14 Rp 104,360,223.19
- Besi Beton Kg 878.58 Rp 180,124.45 Rp 158,253,559.16
- Bekisting M² 65.14 #REF! #REF!
#REF!
10 Pek. Cor Plat Dak/Atap Beton Bertulang mutu K225 Tebal = 10cm
- Beton Mutu F'c = 19,3 Mpa (K 225) M³ 14.90 Rp 30,514,685.14 Rp 454,668,808.63
- Besi Beton Kg 5161.22 Rp 180,124.45 Rp 929,662,454.20
- Bekisting M² 149.00 #REF! #REF!
#REF!
Jumlah IV #REF!
V. PEKERJAAN KAP ATAP & DINDING
1 Pek.Pas. Kuda-kuda Baja Ringan + Reng M2 260.55 #REF! #REF!
2 Pek. Atap Genteng Metal M2 260.55 #REF! #REF!
2 Pek. Pas. Kalsiplank 8mm M1 77.00 Rp 49,313.00 Rp 3,797,101.00
3 Pek. Pas. Plafond Kalsiboard 3,5mm + Rangka Hollow Lantai 1 M2 288.00 #REF! #REF!
4 List Profil Gypsum M1 77.00 Rp 63,000.00 Rp 4,851,000.00
5 Pek. Dinding Luar Exterior "MARMER" M2 20.00 #REF! #REF!
Jumlah V #REF!
VI. PEKERJAAN KUSEN PINTU, JENDELA, VENTILASI
1 Pek. Detail Type P1 + Accessories (sesuai detail gambar kerja kusen) Unit 3.00 #REF! #REF!
2 Pek. Detail Type P2 + Accessories (sesuai detail gambar kerja kusen) Unit 1.00 #REF! #REF!
Jumlah VI #REF!
VII. PEKERJAAN PENGECETAN
1 Pek. Pengecetan Dinding Tembok M2 3472.54 Rp 78,639.55 Rp 273,078,982.96
2 Pek. Pengecetan Plafond M2 288.00 Rp 78,639.55 Rp 22,648,190.40
Jumlah VII Rp 295,727,173.36
VIII. PEKERJAAN INSTALASI LISTRIK
1 Instalasi Titik Lampu & Stop Kontak, Saklar + MCB Titik 56.00 Rp 2,500.00 Rp 140,000.00
2 Kabel NYM 2 x 2,5mm Roll 10.00 Rp 40,000.00 Rp 400,000.00
3 Box MCB Unit 1.00 Rp 715.00 Rp 715.00
4 Stop Kontak Tunggal Bh 9.00 Rp 1,000.00 Rp 9,000.00
5 Saklar Tunggal Bh 1.00 Rp 4,500.00 Rp 4,500.00
6 Saklar Ganda Bh 13.00 Rp 2,000.00 Rp 26,000.00
7 Mongkok Unit 20.00 Rp 6,000.00 Rp 120,000.00
8 Pipa AB PVC 1/2 + Accessories M1 150.00 Rp 15,000.00 Rp 2,250,000.00
10 Lampu SL 18 Watt Bh 7.00 Rp 15,000.00 Rp 105,000.00
Jumlah VIII Rp 3,055,215.00
X. PEKERJAAN KUBAH MESJID
1 Kubah 3/4 Ornament Diameter 5 Bh 1.00 Rp 122,870,000.00 Rp 122,870,000.00
2 Kubah 3/4 Ornament Diameter 2.5 Bh 2.00 Rp 50,600,000.00 Rp 101,200,000.00
3 Kubah 3/4 Ornament Diameter 2 Bh 2.00 Rp 24,750,000.00 Rp 49,500,000.00
Jumlah X Rp 273,570,000.00
XI. PEKERJAAN AKHIR
1 Pek.Administrasi Dan Pelaporan Ls 1.00 Rp 1,500,000.00 Rp 1,500,000.00
2 Pengangkutan Sisa-Sisa Bahan/Pembersihan Akhir Proyek Ls 1.00 Rp 1,000,000.00 Rp 1,000,000.00
Jumlah XI Rp 2,500,000.00
urugan baw 13.5 Rp 157,025 pondasi
Rp 2,119,838 galian
urugan,gal. pon
pas. Batu
pasir urug pondasi
sloof
berat besi
bekisting
URUGAN PASIR B. LNTAI
15
14
3.5
17
16
10
7
10
6
8.4
18.8
11.4
8.8
12.8
158.7
pondasi teras depan
16
0.25 0.6 0.8
1.6 3.2
2.85 11.4
8.1 16.2
30.8
1.9