PEMERINTAH KABUPATEN BOGOR

DINAS PEKERJAAN UMUM DAN PENATAAN RUANG

KEGIATAN :

PENINGKATAN JALAN PAMIPIRAN - CIKUTAMAHI

KECAMATAN CARIU

BACK UP VOLUME ADDENDUM - I


TAHUN ANGGARAN 2017

PENYEDIA JASA :

PT. DOVLEN SEVENTY


PEMERINTAH KABUPATEN BOGOR
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG

DAFTAR KUANTITAS DAN HARGA ADDENDUM-I

KODE PAKET : 15.1080


KEGIATAN : PENINGKATAN JALAN PAMIPIRAN - CIKUTAMAHI
LOKASI : KECAMATAN CARIU
KABUPATEN : BOGOR

HARGA PERSENTASE BALANCE BUDGET


NO. MATA BACK UP AWAL BACK UP VOLUME ADD-I
URAIAN PEKERJAAN SAT HARGA SATUAN PERKIRAAN HARGA PEKERJAAN TAMBAH PEKERJAAN KURANG
PEMBAYARAN
SENDIRI (HPS) TIMPANG (%) VOLUME JUMLAH HARGA VOLUME JUMLAH HARGA VOLUME JUMLAH HARGA VOLUME JUMLAH HARGA
DIVISI 1. UMUM
1.2 Mobilisasi Ls 69,386,340.07 1.00 69,386,340.07 1.00 69,386,340.07 - - - -

DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 36,389.65 21,363.91 170.33 61.44 2,235,780.10 911.40 33,165,527.01 849.96 30,929,746.91 - -
2.3.(4) Gorong-gorong Pipa Beton Bertulang, diameter dalam 95 - 105 cm M' 2,111,100.80 1,661,050.25 127.09 5.00 10,555,504.00 5.00 10,555,504.00 - - - -
2.3.(4) Gorong-gorong Pipa Beton Bertulang, diameter dalam 95 - 105 cm M' 1,661,050.25 1,661,050.25 100.00 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
2.3.(9).b Saluran berbentuk U Tipe DS 1 500 - 700 M' 730,253.24 809,675.98 90.19 128.00 93,472,414.72 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
2.3.(9).b1 Penutup Saluran berbentuk U Tipe DS 1 500 M' 401,864.67 529,596.99 75.88 128.00 51,438,677.76 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
2.4.(4) Pipa PVC Ø 2" untuk Sulingan M' 25,000.00 19,635.00 127.32 79.00 1,975,000.00 79.00 1,975,000.00 - - - -
2.4.(4) Pipa PVC Ø 2" untuk Sulingan M' 19,635.00 19,635.00 100.00 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?

DIVISI 3. PEKERJAAN TANAH


3.1.(1a) Galian Biasa M3 67,181.86 39,470.07 170.21 341.45 22,939,246.10 341.45 22,939,246.10 - - - -
3.1.(1a) Galian Biasa M3 39,470.07 39,470.07 100.00 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
3.1.(3) Galian Struktur dengan kedalaman 0 - 2 meter M3 #REF! 69,159.45 #REF! - #REF! #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
3.2.(1b) Timbunan Biasa Dari Galian M3 205,074.03 36,272.26 565.37 37.50 7,690,276.13 37.50 7,690,276.13 - - - -
3.2.(1b) Timbunan Biasa Dari Galian M3 36,272.26 36,272.26 100.00 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?

DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN


4.2.(1) Lapis Pondasi Agregat Kelas A M3 356,988.70 360,708.45 98.97 299.25 106,828,868.48 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?

DIVISI 5. PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN


5.1.(1) Lapis Pondasi Agregat Kelas A M3 356,988.70 359,149.86 99.40 261.55 93,370,394.49 #REF! #REF! #REF! #REF! #REF! #REF!
5.1.(2) Lapis Pondasi Agregat Kelas B M3 331,162.09 312,931.49 105.83 222.98 73,840,867.02 #REF! #REF! #REF! #REF! #REF! #REF!
5.3.(1) Perkerasaan Beton Semen fs 45 (28 hari) M3 1,547,629.10 1,706,631.65 90.68 3,105.00 4,805,388,355.50 #REF! #REF! #REF! #REF! #REF! #REF!
5.3.(3) Lapis Pondasi bawah Beton Kurus M3 886,948.04 1,139,350.49 77.85 809.25 717,762,701.37 #REF! #REF! #REF! #REF! #REF! #REF!

DIVISI 6. PERKERASAN ASPAL


6.1.(1a) Lapis Resap Pengikat - Aspal Cair Liter #REF! 10,073.12 #REF! - #REF! #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
6.1.(2a) Lapis Perekat - Aspal Cair Liter #REF! 9,956.97 #REF! - #REF! 1,984.50 #REF! 1,984.50 #REF! - #REF!
6.3.(5a) Laston Lapis Aus (AC-WC) Ton #REF! 1,286,595.81 #REF! - #REF! 757.42 #REF! 757.42 #REF! - #REF!
6.3.(6a) Laston Lapis Antara (AC-BC) Ton #REF! 1,239,632.86 #REF! - #REF! #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?

DIVISI 7. STRUKTUR
7.3.(1) Baja Tulangan U 24 Polos Kg #REF! 12,814.14 #REF! - #REF! #REF! #REF! #REF! #REF! #REF! #REF!
7.9.(1) Pasangan Batu M3 967,111.37 896,545.14 107.87 72.50 70,115,574.33 #REF! #REF! #REF! #REF! #REF! #REF!

DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR

DIVISI 9. PEKERJAAN HARIAN

DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN

JUMLAH HARGA PEKERJAAN #REF! #REF! #REF! #REF!


PAJAK PERTAMBAHAN NILAI (PPN) 10% #REF! #REF! #REF! #REF!
JUMLAH TOTAL HARGA PEKERJAAN #REF! #REF! #REF! #REF!
JUMLAH TOTAL HARGA PEKERJAAN DIBULATKAN #REF! #REF! #REF! #REF!
BACK UP VOLUME

NAMA PAKET : Penanganan Bahu Ruas Jalan Cipadung - Cisempak


NAMA RUAS : Cipadung - Cisempak
NO. MATA PEMBAYARAN :

JENIS PEKERJAAN : Mobilisasi

skets :
150
10 10 10 10
110
PEMERINTAH KABUPATEN BOGOR PUTIH
1,5 DINAS BINA MARGA DAN PENGAIRAN

40 NAMA KEGIATAN :

LOKASI :

80
BIAYA :

MANFAAT : KUNING
NO./TGL. KONTRAK :
10
120
1,5 15 PELAKSANAAN :

PELAKSANA :

80
WARNA JINGGA

WARNA PUTIH 20 20
10 10

250
50
10 10 10 10

170
150
10 10 10 10
110
1,5

AWAS HATI-HATI !!
80
ADA PERBAIKAN JALAN

160

10
1,5 15

80

20 20

10 10

50
10 10 10 10

No. Uraian Satuan Volume Keterangan

1 Kantor LS 1.00
2 Barak LS 1.00
3 Gudang LS 1.00
4 Papan Nama Kegiatan BH 2.00
5 Rambu Peringatan BH 2.00
6 Rambu Pengarah Jalan BH 4.00
7 Mobilisasi Alat LS 1.00
8 Demobilisasi Alat LS 1.00

Jumlah LS 1.00
BACK UP VOLUME

NAMA PAKET : Kampung Jeans

NO. MATA PEMBAYARA : 2.1.(1)

JENIS PEKERJAAN : Galian untuk Selokan Drainase dan Saluran Air

skets :

Jalur Panjang Perhitungan (m) Luas Volume


No. sta - sta Keterangan
Ki/ka M Lebar Tinggi M2 M3

1 0+000 - 0+050 Ki 50.00 0.70 0.80 35.00 28.00


2 0+050 0+100 Ki 50.00 0.70 0.80 35.00 28.00
3 0+100 - 0+150 Ki 50.00 0.70 0.80 35.00 28.00
4 0+150 0+200 Ki 50.00 0.70 0.80 35.00 28.00
5 0+200 - 0+250 Ki 50.00 0.70 0.80 35.00 28.00
6 0+250 0+300 Ki 50.00 0.70 0.80 35.00 28.00
7 0+300 - 0+350 Ki 50.00 0.70 0.80 35.00 28.00
8 0+350 0+400 Ki 50.00 0.70 0.80 35.00 28.00
9 0+400 - 0+450 Ki 50.00 0.70 0.80 35.00 28.00
10 0+450 0+500 Ki 50.00 0.70 0.80 35.00 28.00
11 0+500 - 0+550 Ki 50.00 0.70 0.80 35.00 28.00
12 0+550 0+600 Ki 50.00 0.70 0.80 35.00 28.00
13 0+600 - 0+650 Ki 50.00 0.70 0.80 35.00 28.00
14 0+650 0+700 Ki 50.00 0.70 0.80 35.00 28.00
15 0+700 - 0+750 Ki 50.00 0.70 0.80 35.00 28.00
16 0+750 0+800 Ki 50.00 0.70 0.80 35.00 28.00
17 0+800 - 0+850 Ki 50.00 0.70 0.80 35.00 28.00
18 0+850 0+900 Ki 50.00 0.70 0.80 35.00 28.00
19 0+900 - 0+950 Ki 50.00 0.70 0.80 35.00 28.00
20 0+950 1+000 Ki 50.00 0.70 0.80 35.00 28.00
21 1+000 - 1+050 Ki 50.00 0.70 0.80 35.00 28.00
22 1+050 1+100 Ki 50.00 0.70 0.80 35.00 28.00
23 1+100 - 1+150 Ki 50.00 0.70 0.80 35.00 28.00
24 1+150 1+200 Ki 50.00 0.70 0.80 35.00 28.00
25 1+200 - 1+250 Ki 50.00 0.70 0.80 35.00 28.00
26 1+250 1+300 Ki 50.00 0.70 0.80 35.00 28.00
27 1+300 - 1+350 Ki 50.00 0.70 0.80 35.00 28.00
28 1+350 1+400 Ki 50.00 0.70 0.80 35.00 28.00
29 1+400 - 1+450 Ki 50.00 0.70 0.80 35.00 28.00
30 1+450 1+500 Ki 50.00 0.70 0.80 35.00 28.00
31 1+500 - 1+550 Ki 50.00 0.70 0.80 35.00 28.00
32 1+550 1+600 Ki 50.00 0.70 0.80 35.00 28.00
33 1+600 - 1+628 Ki 27.50 0.70 0.80 19.25 15.40

911.40
BACK UP VOLUME

NAMA PAKET : Kampung Jeans

NO. MATA PEMBAYARA : 2.1.(1)

JENIS PEKERJAAN : Galian untuk Selokan Drainase dan Saluran Air

skets :

Jalur Panjang Perhitungan (m) Luas Volume


No. sta - sta Keterangan
Ki/ka M Lebar Tinggi M2 M3

1 0+000 - 0+050 Ka 50.00 0.70 0.80 35.00 28.00


2 0+050 0+100 Ka 50.00 0.70 0.80 35.00 28.00
3 0+100 - 0+150 Ka 50.00 0.70 0.80 35.00 28.00
4 0+150 0+200 Ka 50.00 0.70 0.80 35.00 28.00
5 0+200 - 0+250 Ka 50.00 0.70 0.80 35.00 28.00
6 0+250 0+300 Ka 50.00 0.70 0.80 35.00 28.00
7 0+300 - 0+350 Ka 50.00 0.70 0.80 35.00 28.00
8 0+350 0+400 Ka 50.00 0.70 0.80 35.00 28.00
9 0+400 - 0+450 Ka 50.00 0.70 0.80 35.00 28.00
10 0+450 0+500 Ka 50.00 0.70 0.80 35.00 28.00
11 0+500 - 0+550 Ka 50.00 0.70 0.80 35.00 28.00
12 0+550 0+600 Ka 50.00 0.70 0.80 35.00 28.00
13 0+600 - 0+650 Ka 50.00 0.70 0.80 35.00 28.00
14 0+650 0+700 Ka 50.00 0.70 0.80 35.00 28.00
15 0+700 - 0+750 Ka 50.00 0.70 0.80 35.00 28.00
16 0+750 0+800 Ka 50.00 0.70 0.80 35.00 28.00
17 0+800 - 0+850 Ka 50.00 0.70 0.80 35.00 28.00
18 0+850 0+900 Ka 50.00 0.70 0.80 35.00 28.00
19 0+900 - 0+950 Ka 50.00 0.70 0.80 35.00 28.00
20 0+950 1+000 Ka 50.00 0.70 0.80 35.00 28.00
21 1+000 - 1+050 Ka 50.00 0.70 0.80 35.00 28.00
22 1+050 1+100 Ka 50.00 0.70 0.80 35.00 28.00
23 1+100 - 1+150 Ka 50.00 0.70 0.80 35.00 28.00
24 1+150 1+200 Ka 50.00 0.70 0.80 35.00 28.00
25 1+200 - 1+250 Ka 50.00 0.70 0.80 35.00 28.00
26 1+250 1+300 Ka 50.00 0.70 0.80 35.00 28.00
27 1+300 - 1+350 Ka 50.00 0.70 0.80 35.00 28.00
28 1+350 1+400 Ka 50.00 0.70 0.80 35.00 28.00
29 1+400 - 1+450 Ka 50.00 0.70 0.80 35.00 28.00
30 1+450 1+500 Ka 50.00 0.70 0.80 35.00 28.00
31 1+500 - 1+550 Ka 50.00 0.70 0.80 35.00 28.00
32 1+550 1+600 Ka 50.00 0.70 0.80 35.00 28.00
33 1+600 - 1+628 Ka 27.50 0.70 0.80 19.25 15.40

911.40
Back Up Volume

NAMA PAKET : Kampung Jeans

NO. MATA PEMBAYARA : 2.3.(9).a

JENIS PEKERJAAN : Saluran berbentuk U Tipe DS 1 300 - 500

skets :

Jalur Panjang Perhitungan (m) Luas Volume


No. sta - sta Keterangan
Ki/ka M Lebar Tinggi M2 M3

1 0+000 - 0+050 Ki 50.00 1.00 50.00 Saluran type U-300


2 0+050 - 0+100 Ki 50.00 1.00 50.00 Saluran type U-300
0+100 - 0+150 Ki 50.00 1.00 50.00
0+150 - 0+200 Ki 50.00 1.00 50.00
0+200 - 0+250 Ki 50.00 1.00 50.00
0+250 - 0+300 Ki 50.00 1.00 50.00
0+300 - 0+350 Ki 50.00 1.00 50.00
0+350 - 0+400 Ki 50.00 1.00 50.00
0+400 - 0+450 Ki 50.00 1.00 50.00
0+450 - 0+500 Ki 50.00 1.00 50.00
0+500 - 0+550 Ki 50.00 1.00 50.00
0+550 - 0+600 Ki 50.00 1.00 50.00
0+600 - 0+650 Ki 50.00 1.00 50.00
0+650 - 0+700 Ki 50.00 1.00 50.00
0+700 - 0+750 Ki 50.00 1.00 50.00
0+750 - 0+800 Ki 50.00 1.00 50.00
0+800 - 0+850 Ki 50.00 1.00 50.00
0+850 - 0+900 Ki 50.00 1.00 50.00
0+900 - 0+950 Ki 50.00 1.00 50.00
0+950 - 1+000 Ki 50.00 1.00 50.00
1+000 - 1+050 Ki 50.00 1.00 50.00
1+050 - 1+100 Ki 50.00 1.00 50.00
1+100 - 1+150 Ki 50.00 1.00 50.00
1+150 - 1+200 Ki 50.00 1.00 50.00
1+200 - 1+250 Ki 50.00 1.00 50.00
1+250 - 1+300 Ki 50.00 1.00 50.00
1+300 - 1+350 Ki 50.00 1.00 50.00
1+350 - 1+400 Ki 50.00 1.00 50.00
1+400 - 1+450 Ki 50.00 1.00 50.00
1+450 - 1+500 Ki 50.00 1.00 50.00
1+500 - 1+550 Ki 50.00 1.00 50.00
1+550 - 1+600 Ki 50.00 1.00 50.00
1+600 - 1+628 Ki 27.50 1.00 27.50

1627.50
Back Up Volume

NAMA PAKET : Kampung Jeans

NO. MATA PEMBAYARA : 2.3.(9).a

JENIS PEKERJAAN : Saluran berbentuk U Tipe DS 1 300 - 500

skets :

Jalur Panjang Perhitungan (m) Luas Volume


No. sta - sta Keterangan
Ki/ka M Lebar Tinggi M2 M3

1 0+000 - 0+050 Ka 50.00 1.00 50.00 Saluran type U-300


2 0+050 - 0+100 Ka 50.00 1.00 50.00 Saluran type U-300
0+100 - 0+150 Ka 50.00 1.00 50.00
0+150 - 0+200 Ka 50.00 1.00 50.00
0+200 - 0+250 Ka 50.00 1.00 50.00
0+250 - 0+300 Ka 50.00 1.00 50.00
0+300 - 0+350 Ka 50.00 1.00 50.00
0+350 - 0+400 Ka 50.00 1.00 50.00
0+400 - 0+450 Ka 50.00 1.00 50.00
0+450 - 0+500 Ka 50.00 1.00 50.00
0+500 - 0+550 Ka 50.00 1.00 50.00
0+550 - 0+600 Ka 50.00 1.00 50.00
0+600 - 0+650 Ka 50.00 1.00 50.00
0+650 - 0+700 Ka 50.00 1.00 50.00
0+700 - 0+750 Ka 50.00 1.00 50.00
0+750 - 0+800 Ka 50.00 1.00 50.00
0+800 - 0+850 Ka 50.00 1.00 50.00
0+850 - 0+900 Ka 50.00 1.00 50.00
0+900 - 0+950 Ka 50.00 1.00 50.00
0+950 - 1+000 Ka 50.00 1.00 50.00
1+000 - 1+050 Ka 50.00 1.00 50.00
1+050 - 1+100 Ka 50.00 1.00 50.00
1+100 - 1+150 Ka 50.00 1.00 50.00
1+150 - 1+200 Ka 50.00 1.00 50.00
1+200 - 1+250 Ka 50.00 1.00 50.00
1+250 - 1+300 Ka 50.00 1.00 50.00
1+300 - 1+350 Ka 50.00 1.00 50.00
1+350 - 1+400 Ka 50.00 1.00 50.00
1+400 - 1+450 Ka 50.00 1.00 50.00
1+450 - 1+500 Ka 50.00 1.00 50.00
1+500 - 1+550 Ka 50.00 1.00 50.00
1+550 - 1+600 Ka 50.00 1.00 50.00
1+600 - 1+628 Ka 27.50 1.00 27.50

1627.50
#REF!

NAMA PAKET :

NO. MATA PEMBAYARAN : 2.2

JENIS PEKERJAAN : Pasangan Batu dengan Mortar

skets :
25 25

25 25

80
C F 80

20
B 45 45
E 20

35 20 20 35

60
A D 60

80 60 80

Panjang Volume
No. sta - sta Ki / Ka Perhitungan Volume (luas) Keterangan
(m') M3
Panjang Tinggi Alas
1 Ki / Ka 6.00 6.00 x 0.60 x 0.80 2.88 LUAS A
2 Ki / Ka 6.00 6.00 x 0.45 x 0.25 0.34 LUAS B
3 Ki / Ka 6.00 6.00 x 0.80 x 0.25 X 0.25 1.20 LUAS C
4 Ki / Ka 6.00 6.00 x 0.60 x 0.80 1.44 LUAS D
5 Ki / Ka 6.00 6.00 x 0.45 x 0.25 0.68 LUAS E
6 Ki / Ka 6.00 6.00 x 0.80 x 0.25 X 0.25 1.20 LUAS F
Ki / Ka 6.00 6.00 x 0.20 x 1.00 1.20 LUAS G

Jumlah I 8.93
BACK UP VOLUME

NAMA PAKET : Penanganan Bahu Ruas Jalan Cipadung - Cisempak


NAMA RUAS : Cipadung - Cisempak
NO. MATA PEMBAYARAN : 3.1.(9)

JENIS PEKERJAAN : Galian Perkerasan berbutir

skets :

Jalur Panjang Perhitungan (m) Luas Volume


No. sta - sta Keterangan
Ki/ka M Lebar Ki Lebar Ka Tebal/Tinggi M2 M3
1 1+170 - 1+200 Ki-Ka 30.00 1.00 1.00 0.350 60.00 21.00
2 1+200 - 1+229 Ki-Ka 29.00 1.00 1.00 0.350 58.00 20.30
3 1+229 - 1+250 Ki-Ka 21.00 0.00 1.00 0.350 21.00 7.35
4 1+250 - 1+284 Ka 34.00 0.00 1.00 0.350 34.00 11.90
5 1+284 - 1+300 Ki-Ka 16.00 0.50 1.00 0.350 24.00 8.40
6 1+300 - 1+350 Ki-Ka 50.00 0.70 1.00 0.350 85.00 29.75
7 1+350 - 1+360 Ki-Ka 10.00 1.00 1.00 0.350 20.00 7.00
8 1+360 - 1+397 Ki-Ka 37.00 1.00 1.00 0.350 74.00 25.90
9 1+397 - 1+404 Ka 7.00 0.00 1.00 0.350 7.00 2.45
10 1+404 - 1+423 Ki-Ka 19.00 1.00 1.00 0.350 38.00 13.30
11 1+423 - 1+440 Ki-Ka 17.00 0.00 1.00 0.350 17.00 5.95

Jumlah I 36.00 153.30


#REF!

NAMA PAKET : Kampung Pandai Besi Segmen 2

NO. MATA PEMBAYARAN : 4.2.(14)

JENIS PEKERJAAN : Perkerasan Beton Semen (Beton Mutu K-250) (Plat Trotoar)

skets :

Jalur Perhitungan (m) Luas Volume


No. sta - sta Keterangan
Ki/ka Panjang Lebar Tebal/Tinggi M2 M3
1 0+000 0+045 Ki 45.00 0.70 0.15 31.50 4.73 Plat Trotoar
2 0+055 0+100 Ki 45.00 0.70 0.15 31.50 4.73 Plat Trotoar
3 0+100 0+200 Ki 100.00 0.70 0.15 70.00 10.50 Plat Trotoar
4 0+200 0+211 Ki 11.00 0.70 0.15 7.70 1.16 Plat Trotoar

Jumlah I 21.11
#REF!

NAMA PAKET : Kampung Pandai Besi Segmen 2

NO. MATA PEMBAYARAN : 4.2.(14)

JENIS PEKERJAAN : Perkerasan Beton Semen (Beton Mutu K-250) (Plat Trotoar)

skets :

Jalur Perhitungan (m) Luas Volume


No. sta - sta Keterangan
Ki/ka Panjang Lebar Tebal/Tinggi M2 M3
1 0+000 0+045 Ka 45.00 0.70 0.15 31.50 4.73 Plat Trotoar
2 0+055 0+100 Ka 45.00 0.70 0.15 31.50 4.73 Plat Trotoar
3 0+100 0+200 Ka 100.00 0.70 0.15 70.00 10.50 Plat Trotoar
4 0+200 0+211 Ka 11.00 0.70 0.15 7.70 1.16 Plat Trotoar

Jumlah I 21.11
#REF!

NAMA PAKET : Kampung Pandai Besi Segmen 2

NO. MATA PEMBAYARAN : 4.2.(14)

JENIS PEKERJAAN : UBIN STONE TILE 30/30/3cm TYPE DIFABEL

skets :

Jalur Perhitungan (m) Buah


No. sta - sta Keterangan
Ki/ka Panjang Lebar keramik Panjang keramik Keramik
1 0+000 0+045 Ki 45.00 0.30 0.30 150.00 UBIN STONE TILE 30/30/3cm TYPE DIFABEL
2 0+055 0+100 Ki 45.00 0.30 0.30 150.00 UBIN STONE TILE 30/30/3cm TYPE DIFABEL
3 0+100 0+200 Ki 100.00 0.30 0.30 333.33 UBIN STONE TILE 30/30/3cm TYPE DIFABEL
4 0+200 0+211 Ki 11.00 0.30 0.30 36.67 UBIN STONE TILE 30/30/3cm TYPE DIFABEL

Jumlah I 670.00
#REF!

NAMA PAKET : Kampung Pandai Besi Segmen 2

NO. MATA PEMBAYARAN : 4.2.(14)

JENIS PEKERJAAN : UBIN STONE TILE 30/30/3cm TYPE DIFABEL

skets :

Jalur Perhitungan (m) Buah


No. sta - sta Keterangan
Ki/ka Panjang Lebar keramik Panjang keramik Keramik
1 0+000 0+045 Ka 45.00 0.30 0.30 150.00 UBIN STONE TILE 30/30/3cm TYPE DIFABEL
2 0+055 0+100 Ka 45.00 0.30 0.30 150.00 UBIN STONE TILE 30/30/3cm TYPE DIFABEL
3 0+100 0+200 Ka 100.00 0.30 0.30 333.33 UBIN STONE TILE 30/30/3cm TYPE DIFABEL
4 0+200 0+211 Ka 11.00 0.30 0.30 36.67 UBIN STONE TILE 30/30/3cm TYPE DIFABEL

Jumlah I 670.00
BACK UP VOLUME

NAMA PAKET : Penanganan Bahu Ruas Jalan Cipadung - Cisempak


NAMA RUAS : Cipadung - Cisempak
NO. MATA PEMBAYARAN : 3.2.(1b)

JENIS PEKERJAAN : Timbunan Biasa dari hasil galian

skets :

Jalur Panjang Lebar M Jalan Tebal Luas Volume Volume Kerusakan Total Volume
No. sta Rencana M Kerusakan Keterangan
Ki/ka M M2 M3 Persentase (%)
1 #NAME? - #NAME? Ki+Ka #NAME? 1.00 0.08 #NAME? #NAME? 100% #NAME?
2 #NAME? - #NAME? Ki+Ka #NAME? 1.00 0.08 #NAME? #NAME? 100% #NAME?
3 #NAME? - #NAME? Ki+Ka #NAME? 1.00 0.08 #NAME? #NAME? 100% #NAME?
4 #NAME? - #NAME? Ki+Ka #NAME? 1.00 0.08 #NAME? #NAME? 100% #NAME?
4 #NAME? - #NAME? Ki+Ka #NAME? 1.00 0.08 #NAME? #NAME? 100% #NAME?

Jumlah #NAME? #NAME? #NAME?


BACK UP VOLUME

NAMA PAKET : Penanganan Bahu Ruas Jalan Cipadung - Cisempak


NAMA RUAS : Sindangtaman-Sukamantri
NO. MATA PEMBAYARAN : 5.1.(2)

JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas B

skets :

Jalur Perhitungan (m) Luas Volume


No. sta - sta Keterangan
Ki/ka Panjang Lebar Ki Lebar Ka Tebal/Tinggi M2 M3
1 1+170 - 1+200 Ki-Ka 30.00 1.00 1.00 0.10 60.00 6.00
2 1+200 1+229 Ki-Ka 29.00 1.00 1.00 0.10 58.00 5.80
3 1+229 1+250 Ki-Ka 21.00 0.00 1.00 0.10 21.00 2.10
4 1+250 1+284 Ka 34.00 0.00 1.00 0.10 34.00 3.40
5 1+284 1+300 Ki-Ka 16.00 0.50 1.00 0.10 24.00 2.40
6 1+300 1+350 Ki-Ka 50.00 0.70 1.00 0.10 85.00 8.50
7 1+350 1+360 Ki-Ka 10.00 1.00 1.00 0.10 20.00 2.00
8 1+360 1+397 Ki-Ka 37.00 1.00 1.00 0.10 74.00 7.40
9 1+397 1+404 Ka 7.00 0.00 1.00 0.10 7.00 0.70
10 1+404 1+423 Ki-Ka 19.00 1.00 1.00 0.10 38.00 3.80
11 1+423 1+440 Ki-Ka 17.00 0.00 1.00 0.10 17.00 1.70

Jumlah I 270.00 44.66 1375


1105.00
BACK UP VOLUME

NAMA PAKET : Penanganan Bahu Ruas Jalan Cipadung - Cisempak


NAMA RUAS : Cipadung - Cisempak
NO. MATA PEMBAYARAN : 5.3.(1.a)

JENIS PEKERJAAN : Perkerasan Beton Semen (PPC) (Manual)

skets :

Jalur Perhitungan (m) Luas Volume


No. sta - sta Keterangan
Ki/ka Panjang Lebar Ki Lebar Ka Tebal/Tinggi M2 M3
1 1+170 - 1+200 Ki-Ka 30.00 1.00 1.00 0.20 60.00 12.00
2 1+200 1+229 Ki-Ka 29.00 1.00 1.00 0.20 58.00 11.60
3 1+229 1+250 Ki-Ka 21.00 0.00 1.00 0.20 21.00 4.20
4 1+250 1+284 Ka 34.00 0.00 1.00 0.20 34.00 6.80
5 1+284 1+300 Ki-Ka 16.00 0.50 1.00 0.20 24.00 4.80
6 1+300 1+350 Ki-Ka 50.00 0.70 1.00 0.20 85.00 17.00
7 1+350 1+360 Ki-Ka 10.00 1.00 1.00 0.20 20.00 4.00
8 1+360 1+397 Ki-Ka 37.00 1.00 1.00 0.20 74.00 14.80
9 1+397 1+404 Ka 7.00 0.00 1.00 0.20 7.00 1.40
10 1+404 1+423 Ki-Ka 19.00 1.00 1.00 0.20 38.00 7.60
11 1+423 1+440 Ki-Ka 17.00 0.00 1.00 0.20 17.00 3.40

Jumlah I 270.00 87.60 1375


1105.00
BACK UP VOLUME

NAMA PAKET :

NO. MATA PEMBAYARAN : 7,1 (7)

JENIS PEKERJAAN : Beton Mutu Sedang dengan f'c = 20 MPa (K-250) (Site Mix)

skets :
20 20

30 C E 30
B 10 10 D
20 30 A 30 20

600
25

15 F

Panjang Volume
No. sta - sta Ki / Ka Perhitungan Volume (luas) Keterangan
(m') M3
Panjang Tinggi Alas
1 Ki / Ka 1.10 1.10 x 0.20 x 6.00 1.32 LUAS A
2 Ki / Ka 1.10 1.10 x 0.10 x 0.30 0.03 LUAS B
3 Ki / Ka 1.10 1.10 x 0.30 x 0.30 X 0.20 0.08 LUAS C
4 Ki / Ka 1.10 1.10 x 0.10 x 0.30 0.03 LUAS D
5 Ki / Ka 1.10 1.10 x 0.30 x 0.30 X 0.20 0.08 LUAS E
6 Ki / Ka 1.10 1.10 x 0.15 x 0.25 0.04 LUAS F
7 Ki / Ka 10.00 10.00 x 0.35 x 0.30 X 0.20 0.88 LUAS G
8 Ki / Ka 10.00 10.00 x 0.40 x 0.30 1.20 LUAS H
9 Ki / Ka 10.00 10.00 x 0.30 x 2.20 6.60 LUAS I

Jumlah I 10.27
BACK UP VOLUME

NAMA PAKET : Kampung Pandai Besi Segmen 2

NO. MATA PEMBAYARAN : 6.3 (3)

JENIS PEKERJAAN : Lataston (HRS)

skets :

Panjang Lebar M Jalan Tebal Luas Volume Kuantitas


No. sta BJ Keterangan
M Rencana M M2 M3 Ton
1 0+000 - 0+010 10.00 4.50 0.05 45.00 2.25 2.29 5.15 badan jalan
2 0+010 0+050 40.00 3.00 0.05 120.00 6.00 2.29 13.74 badan jalan
3 0+050 - 0+100 50.00 3.00 0.05 150.00 7.50 2.29 17.18 badan jalan
4 0+100 - 0+150 50.00 3.00 0.05 150.00 7.50 2.29 17.18 badan jalan
5 0+150 - 0+200 50.00 3.00 0.05 150.00 7.50 2.29 17.18 badan jalan
6 0+200 - 0+250 50.00 3.00 0.05 150.00 7.50 2.29 17.18 badan jalan
7 0+250 - 0+300 50.00 3.00 0.05 150.00 7.50 2.29 17.18 badan jalan
8 0+300 - 0+350 50.00 3.00 0.05 150.00 7.50 2.29 17.18 badan jalan
9 0+350 - 0+400 50.00 3.00 0.05 150.00 7.50 2.29 17.18 badan jalan
10 0+400 - 0+450 50.00 3.00 0.05 150.00 7.50 2.29 17.18 badan jalan
11 0+450 - 0+500 50.00 3.00 0.05 150.00 7.50 2.29 17.18 badan jalan
12 0+500 - 0+550 50.00 3.00 0.05 150.00 7.50 2.29 17.18 badan jalan
13 0+550 - 0+600 50.00 3.00 0.05 150.00 7.50 2.29 17.18 badan jalan
14 0+600 - 0+650 50.00 3.00 0.05 150.00 7.50 2.29 17.18 badan jalan
15 0+650 - 0+700 50.00 3.00 0.05 150.00 7.50 2.29 17.18 badan jalan
16 0+700 - 0+750 50.00 3.00 0.05 150.00 7.50 2.29 17.18 badan jalan
17 0+750 - 0+800 50.00 3.00 0.05 150.00 7.50 2.29 17.18 badan jalan
18 0+800 - 0+850 50.00 3.00 0.05 150.00 7.50 2.29 17.18 badan jalan
19 0+850 - 0+900 50.00 3.00 0.05 150.00 7.50 2.29 17.18 badan jalan
20 0+900 - 0+950 50.00 3.00 0.05 150.00 7.50 2.29 17.18 badan jalan
21 0+950 - 1+000 50.00 3.00 0.05 150.00 7.50 2.29 17.18 badan jalan
22 1+000 - 1+050 50.00 3.00 0.05 150.00 7.50 2.29 17.18 badan jalan
23 1+050 - 1+100 50.00 3.00 0.05 150.00 7.50 2.29 17.18 badan jalan
24 1+100 - 1+150 50.00 3.00 0.05 150.00 7.50 2.29 17.18 badan jalan
25 1+150 - 1+200 50.00 3.00 0.05 150.00 7.50 2.29 17.18 badan jalan
26 1+200 - 1+250 50.00 3.00 0.05 150.00 7.50 2.29 17.18 badan jalan
27 1+250 - 1+300 50.00 3.00 0.05 150.00 7.50 2.29 17.18 badan jalan
28 1+300 - 1+350 50.00 3.00 0.05 150.00 7.50 2.29 17.18 badan jalan
29 1+350 - 1+400 50.00 3.00 0.05 150.00 7.50 2.29 17.18 badan jalan
30 1+400 - 1+450 50.00 3.00 0.05 150.00 7.50 2.29 17.18 badan jalan
31 1+450 - 1+500 50.00 3.00 0.05 150.00 7.50 2.29 17.18 badan jalan
32 1+500 - 1+550 50.00 3.00 0.05 150.00 7.50 2.29 17.18 badan jalan
33 1+550 - 1+600 50.00 3.00 0.05 150.00 7.50 2.29 17.18 badan jalan
34 1+600 - 1+650 50.00 3.00 0.05 150.00 7.50 2.29 17.18 badan jalan
35 1+650 - 1+700 50.00 3.00 0.05 150.00 7.50 2.29 17.18 badan jalan
36 1+700 - 1+750 50.00 3.00 0.05 150.00 7.50 2.29 17.18 badan jalan
37 1+750 - 1+800 50.00 3.00 0.05 150.00 7.50 2.29 17.18 badan jalan
38 1+800 - 1+850 50.00 3.00 0.05 150.00 7.50 2.29 17.18 badan jalan
39 1+850 - 1+900 50.00 3.00 0.05 150.00 7.50 2.29 17.18 badan jalan
40 1+900 - 1+950 50.00 3.00 0.05 150.00 7.50 2.29 17.18 badan jalan
41 1+950 - 2+000 50.00 3.00 0.05 150.00 7.50 2.29 17.18 badan jalan
42 2+000 - 2+050 50.00 3.00 0.05 150.00 7.50 2.29 17.18 badan jalan
43 2+050 - 2+100 50.00 3.00 0.05 150.00 7.50 2.29 17.18 badan jalan
44 2+100 - 2+150 50.00 3.00 0.05 150.00 7.50 2.29 17.18 badan jalan
45 2+150 - 2+200 50.00 3.00 0.05 150.00 7.50 2.29 17.18 badan jalan

Jumlah 2200.00 757.42


BACK UP VOLUME

NAMA PAKET : Kampung Pandai Besi Segmen 2

NO. MATA PEMBAYARAN : 6.1.(2a)

JENIS PEKERJAAN : Lapis Perekat - Aspal Cair

skets :

Panjang Lebar M Jalan Luas Aspal/m2 Kuantitas


No. sta Keterangan
M Rencana M2 Liter
1 0+000 - 0+010 10.00 4.50 45.00 0.30 13.50 badan jalan
2 0+010 0+050 40.00 3.00 120.00 0.30 36.00 badan jalan
3 0+050 - 0+100 50.00 3.00 150.00 0.30 45.00 badan jalan
4 0+100 - 0+150 50.00 3.00 150.00 0.30 45.00 badan jalan
5 0+150 - 0+200 50.00 3.00 150.00 0.30 45.00 badan jalan
6 0+200 - 0+250 50.00 3.00 150.00 0.30 45.00 badan jalan
7 0+250 - 0+300 50.00 3.00 150.00 0.30 45.00 badan jalan
8 0+300 - 0+350 50.00 3.00 150.00 0.30 45.00 badan jalan
9 0+350 - 0+400 50.00 3.00 150.00 0.30 45.00 badan jalan
10 0+400 - 0+450 50.00 3.00 150.00 0.30 45.00 badan jalan
11 0+450 - 0+500 50.00 3.00 150.00 0.30 45.00 badan jalan
12 0+500 - 0+550 50.00 3.00 150.00 0.30 45.00 badan jalan
13 0+550 - 0+600 50.00 3.00 150.00 0.30 45.00 badan jalan
14 0+600 - 0+650 50.00 3.00 150.00 0.30 45.00 badan jalan
15 0+650 - 0+700 50.00 3.00 150.00 0.30 45.00 badan jalan
16 0+700 - 0+750 50.00 3.00 150.00 0.30 45.00 badan jalan
17 0+750 - 0+800 50.00 3.00 150.00 0.30 45.00 badan jalan
18 0+800 - 0+850 50.00 3.00 150.00 0.30 45.00 badan jalan
19 0+850 - 0+900 50.00 3.00 150.00 0.30 45.00 badan jalan
20 0+900 - 0+950 50.00 3.00 150.00 0.30 45.00 badan jalan
21 0+950 - 1+000 50.00 3.00 150.00 0.30 45.00 badan jalan
22 1+000 - 1+050 50.00 3.00 150.00 0.30 45.00 badan jalan
23 1+050 - 1+100 50.00 3.00 150.00 0.30 45.00 badan jalan
24 1+100 - 1+150 50.00 3.00 150.00 0.30 45.00 badan jalan
25 1+150 - 1+200 50.00 3.00 150.00 0.30 45.00 badan jalan
26 1+200 - 1+250 50.00 3.00 150.00 0.30 45.00 badan jalan
27 1+250 - 1+300 50.00 3.00 150.00 0.30 45.00 badan jalan
28 1+300 - 1+350 50.00 3.00 150.00 0.30 45.00 badan jalan
29 1+350 - 1+400 50.00 3.00 150.00 0.30 45.00 badan jalan
30 1+400 - 1+450 50.00 3.00 150.00 0.30 45.00 badan jalan
31 1+450 - 1+500 50.00 3.00 150.00 0.30 45.00 badan jalan
32 1+500 - 1+550 50.00 3.00 150.00 0.30 45.00 badan jalan
33 1+550 - 1+600 50.00 3.00 150.00 0.30 45.00 badan jalan
34 1+600 - 1+650 50.00 3.00 150.00 0.30 45.00 badan jalan
35 1+650 - 1+700 50.00 3.00 150.00 0.30 45.00 badan jalan
36 1+700 - 1+750 50.00 3.00 150.00 0.30 45.00 badan jalan
37 1+750 - 1+800 50.00 3.00 150.00 0.30 45.00 badan jalan
38 1+800 - 1+850 50.00 3.00 150.00 0.30 45.00 badan jalan
39 1+850 - 1+900 50.00 3.00 150.00 0.30 45.00 badan jalan
40 1+900 - 1+950 50.00 3.00 150.00 0.30 45.00 badan jalan
41 1+950 - 2+000 50.00 3.00 150.00 0.30 45.00 badan jalan
42 2+000 - 2+050 50.00 3.00 150.00 0.30 45.00 badan jalan
43 2+050 - 2+100 50.00 3.00 150.00 0.30 45.00 badan jalan
44 2+100 - 2+150 50.00 3.00 150.00 0.30 45.00 badan jalan
45 2+150 - 2+200 50.00 3.00 150.00 0.30 45.00 badan jalan

Jumlah 1,984.50
Back Up Volume

NAMA PAKET : Kampung Pandai Besi Segmen 2

NO. MATA PEMBAYARAN : 8.4.(10)

JENIS PEKERJAAN : Kerb Pracetak

skets :

Jalur Panjang Perhitungan (m) Luas Volume


No. sta - sta Keterangan
Ki/ka M Lebar Tinggi M2 M3

1 0+000 - 0+100 Ki 100.00 1.00 100.00


2 0+100 0+200 Ki 100.00 1.00 100.00
3 0+200 0+300 Ki 100.00 1.00 100.00
4 0+300 0+400 Ki 100.00 1.00 100.00
5 0+400 0+425 Ki 25.00 1.00 25.00

425.00
Back Up Volume

NAMA PAKET : Kampung Pandai Besi Segmen 2

NO. MATA PEMBAYARAN : 8.4.(10)

JENIS PEKERJAAN : Kerb Pracetak

skets :

Jalur Panjang Perhitungan (m) Luas Volume


No. sta - sta Keterangan
Ki/ka M Lebar Tinggi M2 M3

1 0+000 - 0+100 Ka 100.00 1.00 100.00


2 0+100 0+200 Ka 100.00 1.00 100.00
3 0+200 0+300 Ka 100.00 1.00 100.00
4 0+300 0+400 Ka 100.00 1.00 100.00
5 0+400 0+425 Ka 25.00 1.00 25.00

425.00
Back Up Volume

NAMA PAKET : Kampung Pandai Besi Segmen 2

NO. MATA PEMBAYARAN :

JENIS PEKERJAAN : PJU Tematik Lampu Tenaga Surya 10-20 Watt Tinggi Tiang 4-5 Meter

skets :

TAMPAK DEPAN LAMPU PJU HIAS


SKALA = 1 : 100

Jalur Panjang
No. sta - sta Buah Keterangan
Ki/ka M

1 0+000 - 0+100 Ki 100.00 2.00 per 50m 2 buah PJU


2 0+100 0+200 100.00 2.00
3 0+200 0+300 100.00 2.00
4 0+300 0+400 100.00 2.00
5 0+400 0+425 25.00 1.00

9.00
Back Up Volume

NAMA PAKET : Kampung Pandai Besi Segmen 2

NO. MATA PEMBAYARAN :

JENIS PEKERJAAN : PJU Tematik Lampu Tenaga Surya 10-20 Watt Tinggi Tiang 4-5 Meter

skets :

TAMPAK DEPAN LAMPU PJU HIAS


Jalur Panjang
No. sta - sta Buah
SKALA = 1 : 100
Keterangan
Ki/ka M

1 0+000 - 0+100 Ka 100.00 2.00 per 50m 2 buah PJU


2 0+100 0+200 Ka 100.00 2.00
3 0+200 0+300 Ka 100.00 2.00
4 0+300 0+400 Ka 100.00 2.00
5 0+400 0+425 Ka 25.00 1.00

9.00
BACK UP DATA

NAMA PAKET : #REF!

NO. MATA PEMBAYARA : 6.3.(6c)

JENIS PEKERJAAN : Laston Lapis Antara Perata (AC-BC L)

skets :

Jalur Panjang Perhitungan (m) Luas Volume


No. sta - sta Keterangan
Ki/ka M Lebar Tinggi M2 M3

0.00
BACK UP DATA

NAMA PAKET : #REF!

NO. MATA PEMBAYARA : 6.3.(5a)

JENIS PEKERJAAN : #REF!

skets :

Jalur Panjang Perhitungan (m) Luas Volume


No. sta - sta Keterangan
Ki/ka M Lebar Tinggi M2 M3

0.00 0.00
BACK UP DATA

NAMA PAKET : #REF!

NO. MATA PEMBAYARA : 6.1.(2a)

JENIS PEKERJAAN : Lapis Perekat - Aspal Cair

skets :

Jalur Panjang Perhitungan (m) Luas Volume


No. sta - sta Keterangan
Ki/ka M Lebar indeks M2 M3

0.00 0.00
BACK UP DATA

NAMA PAKET : #REF!

NO. MATA PEMBAYARA : 6.1.(1a)

JENIS PEKERJAAN : Lapis Resap Pengikat - Aspal Cair

skets :

Jalur Panjang Perhitungan (m) Luas Volume


No. sta - sta Keterangan
Ki/ka M Lebar indeks M2 M3

0.00
BACK UP DATA

NAMA PAKET : #REF!

NO. MATA PEMBAYARA : 6.3.(6a)

JENIS PEKERJAAN : Laston Lapis Antara (AC-BC)

skets :

Jalur Panjang Perhitungan (m) Luas Volume


No. sta - sta Keterangan
Ki/ka M Lebar Tinggi M2 Ton

1 #REF! #REF! #REF! 9.00 0.06 #REF! #REF! Oprit

#REF!
BACK UP VOLUME

NAMA PAKET : PENINGKATAN JALAN PAMIPIRAN - CIKUTAMAHI

NO. MATA PEMBAYARAN : 7.3.(1)

JENIS PEKERJAAN : Baja Tulangan U 24 Polos

skets :

PA DA POSISI DIATA S PLAT BETON


DIPASANG WIREMESH SEBELUM DI COR
UNTUK DIATAS GORONG-GORONG

panjang

lebar

Volume
No. sta - sta Ki / Ka Perhitungan Pembesian Keterangan
Kg

4 #REF! Ki/Ka Besi Memanjang


Pj = 8.00 m'

A Ø n Pj. BJ. x Volume (Kg)


8 24.00 7.94 0.395 1 75.271 75.27

Besi Melintang
Lb = 4.50 m'

B Ø n Pj. BJ. x Volume (Kg)


8 41.00 4.44 0.395 1 71.906 71.91

Jumlah 147.18

Diperiksa/Disetujui Oleh : Dibuat Oleh :


KONSULTAN PENGAWAS KONTRAKTOR
0 0

0 0
Quantity Engineer Pelaksana