NO MATA
URAIAN PEKERJAAN SATUAN VOLUME
PEMBAYARAN
a b c d
BAB 1 UMUM
NO MATA
URAIAN PEKERJAAN SATUAN VOLUME
PEMBAYARAN
a b c d
4.03 (1) Galian Biasa untuk Timbunan m 1,756,468.82
4.03 (2) Galian Biasa untuk Material Pengisi Median m 63,954.00
4.03 (3) Galian Biasa untuk Dibuang m 206,584.25
4.03 (5) Galian Batu Lunak Untuk Dibuang m 278,832.72
4.04 Galian Batu (Rock Excavation) m 650,609.69
4.05 (1) Common Borrow Material m 5,587,153.77
4.05 (2) Selected Borrow Material m 178,943.46
4.08 (2) Urugan Material Berbutir (Granular Backfill) m 71,993.83
4.11 (2) Pasangan Batu Kosong (Blinding Stone) m 6,835.71
4.12.(2) Geotextile Separator ( kelas 1 ) m 72,000.00
NO MATA
URAIAN PEKERJAAN SATUAN VOLUME
PEMBAYARAN
a b c d
6.05 (12) Pipa Gorong-gorong Beton Bertulang, 120cm, Tipe A m 100.00
6.05 (13) Pipa Gorong-gorong Beton Bertulang, 120cm, Tipe B m 100.00
6.05 (21) Pipa Gorong-gorong Beton Bertulang, 2 100cm, Tipe D m 193.87
6.06 (01) Saluran, Tipe DS -1 m 255,000.00
6.06 (02) Saluran, Tipe DS -2 m 200.00
6.06 (06) Saluran, Tipe DS -4 m 75,240.00
6.06 (08) Saluran, Tipe DS -5 m 1,050.00
6.06 (010) Saluran, Tipe DS -8 m 69,579.42
6.06 (1)g Saluran Beton, tipe DS - 2E m 22,275.00
6.06 (4) Saluran Pengumpul, tipe DC-1 buah 891.00
6.06 (8) Saluran Pengumpul, tipe DC-5 buah 10.00
6.07 (11) Saluran Peluncur (Chute) m 2,500.00
6.06 (013) Inlet Drain, Tipe DI-1 bh 26.00
6.06 (32) Outlet Drain, Tipe D0-1 bh 26.00
6.08 (01) Pipa Drainase, 15 cm dengan perlengkapan sambungan dan penyangga. m 3,278.60
6.08 (02) Pipa Drainase, 20 cm dengan perlengkapan sambungan dan penyangga. m 9,678.30
6.08 (03) Deck drain beserta asessorisnya, tipe 1. buah 2,304.00
6.09 (01) Bahan Porous untuk Penimbunan atau Bahan Penyaring (Filter) m3 74,250.00
6.09 (2) Geotextile untuk Pekerjaan Drainase Bawah Permukaan m2 49,500.00
6.09 (3) Pipa Berlubang Banyak (Perforated Pipe) untuk Pekerjaan Drainase Bawah Permukaan m' 35,357.14
Wet LC m 7,340.77
NO MATA
URAIAN PEKERJAAN SATUAN VOLUME
PEMBAYARAN
a b c d
NO MATA
URAIAN PEKERJAAN SATUAN VOLUME
PEMBAYARAN
a b c d
10.01 (6) Beton Struktur Kelas B-1-3 (Kepala Pier Beton Bertulang) m 8,021.00
10.01 (7a) Beton Struktur Kelas B-1-4a(Kolom Beton Bertulang dari Pier Tipe Dinding) m 32,121.04
10.01 (10) Beton Struktur Kelas C-1 (Abutments, Telapak Pier, Dinding Penahan Tanah, Pelat Injak, m 21,655.84
Kotak Tanaman)
10.01 (12) Beton Struktur Kelas C-2 (Box Culvert) m 43,628.62
10.01 (14) Beton Kelas C - 4 (Precast Slab) m -
10.01 (15) Beton Kelas E m 3,554.67
10.01 (19) Asphaltic joint filler. Tebal 20mm m' 4,492.80
10.02(1) Batang Baja Tulangan Polos BJTP-24 kg 902,800.00
10.02 (2) Batang Baja Tulangan Ulir BJTD-40 kg 20,616,670.45
10.03 (1) Pengadaan P.C.I Girder span L = 15 m, depth 0.9 m buah 554.00
10.03 (2) Pengadaan P.C.I Girder span L = 20 m, depth 1.25 m buah 152.00
10.03 (3) Pengadaan P.C.I Girder span L = 25 m, depth 1.6 m buah 447.00
10.03 (4) Pengadaan P.C.I Girder span L = 30 m, depth 1.7 m buah 179.00
10.03 (5) Pengadaan P.C.I Girder span L = 35 m, depth 1.7 m buah 29.00
10.03 (6) Pengadaan P.C.I Girder span L = 40 m, depth 2.1 m buah 60.00
10.03 (7) Pengadaan P.C.I Girder span L = 50 m, depth 2.30 m buah 42.00
10.04 (1) Pemasangan P.C.I Girder span L = 15 m, depth 0.9 m buah 554.00
10.04 (2) Pemasangan P.C.I Girder span L = 20 m, depth 1.25 m buah 152.00
10.04 (3) Pemasangan P.C.I Girder span L = 25 m, depth 1.6 m buah 447.00
10.04 (4) Pemasangan P.C.I Girder span L = 30 m, depth 1.7 m buah 140.00
10.04 (5) Pemasangan P.C.I Girder span L = 35 m, depth 1.7 m buah 29.00
10.04 (6) Pemasangan P.C.I Girder span L = 40 m, depth 2.1 m buah 60.00
10.04 (7) Pemasangan P.C.I Girder span L = 50 m, depth 2.30 m buah 42.00
10.07 (4) Tiang Bor Beton Cast-In-Place, dia 150 cm m 5,394.48
10.07 (5) Tiang Bor Beton Cast-In-Place, dia 120 cm m 17,672.85
DAFTAR KUANTITAS DAN HARGA
PEMBANGUNAN JALAN TOL MALANG-PANDAAN
NO MATA
URAIAN PEKERJAAN SATUAN VOLUME
PEMBAYARAN
a b c d
10.07 (6) Tiang Bor Beton Cast-In-Place, dia 80 cm m' 200.00
10.07 (10) PDA Test buah 98.00
10.07 (11) PIT Test buah 98.00
10.09 (1) Sambungan Ekspansi (Expantion Joint), tipe A m 3,750.66
10.10(3b) Sambungan Ekspansi (Expantion Joint), tipe C (celah 5 cm) pada permukaan beton m 881.40
10.10 (2) Bearing Pad dengan asesorisnya ukuran (300 x 350 x 36 mm) buah 1,072.00
10.10 (4)a Bearing Pad dengan asesorisnya ukuran (350 x 400 x 40 mm) buah 1,048.00
10.11(21) Bearing Pad 350 x 450 x 52 mm buah 338.00
10.11(1) Bearing Pad 460 x 550 x 75 mm (move) buah 72.00
10.11(5) Bearing Pad 460 x 550 x 49 mm (fix) buah 72.00
10.11(26) Rubber Bearing Sheet 250x25 m' 1,500.00
10.11(27) Anchor dengan asesorisnya Kg 24,457.42
12.02b Lembar Plat Baja Berprofil m 59,680.47
10.01.(14) Waterstop L=25 cm m' 57.50
Sand Bedding t=10 cm m 10,242.00
NO MATA
URAIAN PEKERJAAN SATUAN VOLUME
PEMBAYARAN
a b c d
12.01 Semak/Perdu bh 4,570.00
12.01 (20) Solid Sodding m 886,866.35
12.01 (21) Strip Sodding m 217,275.51
12.01a Shotcrete m 36,682.01
Key Stone dan perlengkapannya m2 4,317.00
7.10 (3) Gabion Matras (Bronjong) m3 2,182.00
12.02 (1) Pasangan Batu Kali Untuk Retaining Wall m 33,560.44
12.04 (1) Delineator Tipe A buah 9,610.00
12.04 (2) Delineator Tipe B buah 6,139.00
12.05 (1) Guardrail, Tipe A m' 76,740.65
12.05 (2) End Section Guardrail buah 94.00
12.05 (5) Moveable Fence Tipe A m' 55.20
12.05 (6) Chainlink Fence H : 2.6 m m' 3,695.00
12.06 (1) Rambu Pengaturan dan Peringatan, Tipe A-1 buah 20.00
12.06 (2) Rambu Pengaturan dan Peringatan, Tipe A-2 buah 28.00
12.06 (3) Rambu Pengaturan dan Peringatan, Tipe B-1 buah 16.00
12.06 (4) Rambu Pengaturan dan Peringatan, Tipe B-2 buah 28.00
12.06 (5) Rambu Pengaturan dan Peringatan, Tipe C buah 293.00
12.07 (1) Rambu Petunjuk, Peringatan dan Larangan, Tipe A-1 buah 40.00
12.07 (2) Rambu Petunjuk, Peringatan dan Larangan, Tipe A-2 buah 40.00
12.07 (3) Rambu Petunjuk, Peringatan dan Larangan, Tipe A-3 buah 16.00
12.07 (4) Rambu Petunjuk, Peringatan dan Larangan, Tipe A-5 buah 4.00
12.07 (4)a Rambu Petunjuk, Peringatan dan Larangan, Tipe A-4 buah -
12.07 (5) Rambu Petunjuk, Peringatan dan Larangan, Tipe B-1 buah 7.00
12.07 (6) Rambu Petunjuk, Peringatan dan Larangan, Tipe B-2 buah 14.00
12.07 (7) Rambu Petunjuk, Peringatan dan Larangan, Tipe C buah 204.00
DAFTAR KUANTITAS DAN HARGA
PEMBANGUNAN JALAN TOL MALANG-PANDAAN
NO MATA
URAIAN PEKERJAAN SATUAN VOLUME
PEMBAYARAN
a b c d
12.08 (1) Marka Jalan, Tipe-A m 28,553.31
12.08 (2) Marka Jalan, Tipe-B m 3,349.77
12.08 (3) Rumble Strip m 518.40
12.09 (5) Kilometer post buah 212.00
12.10 (1) Concrete Barrier, Tipe-A m' 7,013.00
12.10 (2) Concrete Barrier, Tipe-B m' 74,210.00
12.11 (1) Kerb Beton Tipe A m' 2,556.00
12.12 (1) Pagar ROW, Tipe 1 (Panel Beton) m' 12,190.00
12.12 (2) Pagar ROW, Tipe 2 (Kawat berduri) m' 79,521.73
Hand Railing m' 168.00
Traffic Light set 20.00
NO MATA
URAIAN PEKERJAAN SATUAN VOLUME
PEMBAYARAN
a b c d
13.01 (14) Panel PJU I bh 5.00
13.01 (15) Panel PJU II bh 5.00
13.01 (16) Panel PJU Jembatan overpass & underpass bh 21.00
13.01 (17)a Power from PLN watt 10,000.00
13.01 (18) Box and Foundation Panel meter PLN unit 5.00
13.01 (19) Kabel NYFGBY 4C - 10 mm2 m' 161.00
13.01 (20) Kabel NYFGBY 4C - 35 mm2 m' 5,262.66
13.01 (21) Kabel NYFGBY 4C - 70 mm2 m' 1,200.00
13.01 (22) PLN Panel Meter ( Foundation & Box Panel) unit 5.00
13.01 (23) Kabel NYFGBY 4 x 35 mm2 m' 200.00
13.01 (24) Electrical Control Box (Manhole) Set 40.00
13.01 (25) Galvanized Pipe Diameter 6" (2 jalur) m' 1,560.00
13.01 (31) Stop Kontak Pompa Isap buah 5.00
13.01 (32) Pipa PVC " m' 5.00
13.01 (33) Instalasi dan Asesoris titik 5.00
13.01 (34) Pompa Isap deep well 1 PK unit 5.00
13.01 (34) Pompa Isap 250W, 220Volt, 50Hz unit 5.00
13.01 (35) Instalasi Pompa dan Asesoris unit 5.00
13.01 (36) Pipa PVC 4" m' 200.00
13.01 (37) Pipa PVC 3" m' 200.00
13.02 (1) Pelindung Kabel m' 10,725.00
13.02 (2) Rak Kabel (Cabel Tray) m' 200.00
Backup Generator ktr BUJT (Kap. 20 Kva) set 1.00
Backup Generator ktr layanan & Gerbang (Kap. 45 Kva) set 6.00
13.02 (3) Galian Kabel m' 10,725.00
DAFTAR KUANTITAS DAN HARGA
PEMBANGUNAN JALAN TOL MALANG-PANDAAN
NO MATA
URAIAN PEKERJAAN SATUAN VOLUME
PEMBAYARAN
a b c d
TOTAL HARGA PENAWARAN UNTUK BAB 13
(Pindahkan ke Rekapitulasi)
BAB 14 PLAZA TOL
14.01 (1) Pulau Tol Tipe A unit 20.00
14.01 (3) Pulau Tol Tipe C unit 5.00
14.01 (5)a Atap Gerbang Tol untuk Gerbang 5 Lajur lengkap pemipaan dan listrik unit 5.00
14.01 (6) Gardu Tol (pengumpul tiket) unit 30.00
15.1 Provisional Sum untuk Pengalihan dan Perlindungan Utilitas Yang Ada ls 1.00
NO MATA
URAIAN PEKERJAAN SATUAN VOLUME
PEMBAYARAN
a b c d
(Pindahkan ke Rekapitulasi)
(A) JUMLAH HARGA DIVISI 1 S/D 16
(B) BIAYA DESAIN
(C) JUMLAH BIAYA RC DAN DESAIN ( A+B )
(D) PPN 10%
(E) JUMLAH BIAYA SETELAH PPN ( C+D )
(F) DIBULATKAN (KONTRAK)
KONTRAK AWAL REALISASI KEMAJUA
HARGA SAT. JUMLAH HARGA BOBOT S/D BULAN LALU BULAN INI
(Rp) (Rp) (%) VOLUME JUMLAH HARGA VOLUME
e g e 8 9 10
18,558,868,630.00 0.55 -
14,317,492,398.75 0.42 -
7,758,353,897.46 0.23 -
KONTRAK AWAL REALISASI KEMAJUA
HARGA SAT. JUMLAH HARGA BOBOT S/D BULAN LALU BULAN INI
(Rp) (Rp) (%) VOLUME JUMLAH HARGA VOLUME
e g e 8 9 10
38,641.00 67,871,711,673.62 2.01 - - 80,000.00
46,388.00 2,966,698,152.00 0.09 - - -
30,898.00 6,383,040,156.50 0.19 - - 37,908.00
102,597.00 28,607,400,573.84 0.85 - - 75,000.00
150,970.00 98,222,544,899.30 2.91 - - -
112,569.00 628,940,312,735.13 18.62 - - -
116,925.00 20,922,964,060.50 0.62 - - -
278,021.00 20,015,796,610.43 0.59 - - -
419,698.00 2,868,933,815.58 0.08 - - -
27,629.00 1,989,288,000.00 0.06 - - -
878,788,690,676.90 26.02 -
10,794,848,201.81 0.32 -
179,755,804,898.64 5.32 -
11,817,470,829.60 0.35 -
89,416,726,921.17 2.65 -
818,190,951,847.60 24.23 -
904,612,572,864.76 26.79 -
- - - -
304,020,911,367.57 9.00 -
55,247,649,086.72 1.64 -
16,500,000,000.00 0.49 -
38,341,865,013.75 1.14 -
KONTRAK AWAL REALISASI KEMAJUA
HARGA SAT. JUMLAH HARGA BOBOT S/D BULAN LALU BULAN INI
(Rp) (Rp) (%) VOLUME JUMLAH HARGA VOLUME
e g e 8 9 10
3,376,928,050,315.06 100.00 -
52,076,516,000 - -
3,429,004,566,315 -
342,900,456,632 -
3,771,905,022,947 -
3,771,905,000,000.00 -
REALISASI KEMAJUAN FISIK
BULAN INI S/D BULAN INI
JUMLAH HARGA VOLUME JUMLAH HARGA
11 0 11
363,187,253.03 363,187,253.03
2,036,340,000.00 2,036,340,000.00
- - -
- - -
- -
REALISASI KEMAJUAN FISIK
BULAN INI S/D BULAN INI
JUMLAH HARGA VOLUME JUMLAH HARGA
11 0 11
3,091,280,000.00 80,000.00 3,091,280,000.00
- - -
1,171,281,384.00 37,908.00 1,171,281,384.00
7,694,775,000.00 75,000.00 7,694,775,000.00
- - -
- - -
- - -
- - -
- - -
- - -
11,957,336,384.00 11,957,336,384.00
- - -
- - -
- - -
- -
- - -
- - -
- - -
- - -
- - -
REALISASI KEMAJUAN FISIK
BULAN INI S/D BULAN INI
JUMLAH HARGA VOLUME JUMLAH HARGA
11 0 11
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- -
- - -
REALISASI KEMAJUAN FISIK
BULAN INI S/D BULAN INI
JUMLAH HARGA VOLUME JUMLAH HARGA
11 0 11
- -
- - -
- - -
- -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- -
- - -
- - -
REALISASI KEMAJUAN FISIK
BULAN INI S/D BULAN INI
JUMLAH HARGA VOLUME JUMLAH HARGA
11 0 11
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
6,686,549,870.00 70.00 6,686,549,870.00
2,982,510,900.00 20.00 2,982,510,900.00
- - -
- - -
8,186,568,825.00 25.00 8,186,568,825.00
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
REALISASI KEMAJUAN FISIK
BULAN INI S/D BULAN INI
JUMLAH HARGA VOLUME JUMLAH HARGA
11 0 11
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
17,855,629,595.00 17,855,629,595.00
- - -
- - -
- - -
REALISASI KEMAJUAN FISIK
BULAN INI S/D BULAN INI
JUMLAH HARGA VOLUME JUMLAH HARGA
11 0 11
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
REALISASI KEMAJUAN FISIK
BULAN INI S/D BULAN INI
JUMLAH HARGA VOLUME JUMLAH HARGA
11 0 11
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
REALISASI KEMAJUAN FISIK
BULAN INI S/D BULAN INI
JUMLAH HARGA VOLUME JUMLAH HARGA
11 0 11
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
REALISASI KEMAJUAN FISIK
BULAN INI S/D BULAN INI
JUMLAH HARGA VOLUME JUMLAH HARGA
11 0 11
- -
- - -
- - -
- - -
- - -
- -
- - -
- -
- - -
- - -
- - -
- - -
- - -
- -
REALISASI KEMAJUAN FISIK
BULAN INI S/D BULAN INI
JUMLAH HARGA VOLUME JUMLAH HARGA
11 0 11
32,212,493,232.03 - 32,212,493,232.03
- -
32,212,493,232 32,212,493,232
3,221,249,323 3,221,249,323
35,433,742,555 35,433,742,555
35,433,700,000.00 35,433,700,000.00
PT. JASA MARGA PANDAAN - MALANG
Gedung Graha Simatupang Wing 2B
Jl. T.B. Simatupang No.38, Jati Padang, Pasar Minggu, Jakarta Selatan
NO REQUEST: TANGG
PENGAJUAN MEMULAI PEKERJAAN ( REQUEST ) DIAJUK
9-Nov
DATA PENDUKUNG
TENAGA PERALATAN
RUJUKAN GAMBAR KERJA
JABATAN JUMLAH ALAT UTAMA JUMLAH JENIS B
Inspector :
Lab.Technition :
CATATAN :
Satrio
Site Engineer P
TANGGAL TANGGAL
DIAJUKAN PELAKSANAAN
9-Nov-16 10-Nov-16
KETERANGAN
NDUKUNG
MATERIAL
PENANGGUNG JAWAB
Chief Inspector
Quality Engineer
Disetujui oleh :
Kontraktor
PT. PP (Persero) Tbk
Dwi Sutarto, ST
Project Manager
PT. JASA MARGA PANDAAN - MALANG
Gedung Graha Simatupang Wing 2B
Jl. T.B. Simatupang No.38, Jati Padang, Pasar Minggu, Jakarta Selatan
TANGG
NO REQUEST:
PENGAJUAN MEMULAI PEKERJAAN ( REQUEST ) DIAJUK
9-Nov
DATA PENDUKUNG
TENAGA PERALATAN
RUJUKAN GAMBAR KERJA
JABATAN JUMLAH ALAT UTAMA JUMLAH JENIS B
1. GSP 1 Org 1. Dump Truck 1 Unit
2. Surveyor 4 Org 2. Bulldozer 2 Unit
3. Quality Control 2 Org 3. Excavator 1 Unit
4. HSE 2 Org 4. Rambu LL/RC/Flag 2 Set
5. Pekerja 2 Org 5. Alat bantu batu 1 Set
6 Operator Alat berat 4 Org 7. Lainnya
7. Sopir 7 Org
Inspector :
Lab.Technition :
CATATAN :
Satrio
Site Engineer
TANGGAL TANGGAL
DIAJUKAN PELAKSANAAN
9-Nov-16 10-Nov-16
KETERANGAN
NDUKUNG
MATERIAL
JENIS BAHAN VOLUME
PENANGGUNG JAWAB
Chief Inspector
Quality Engineer
Disetujui oleh :
Kontraktor
PT. PP (Persero) Tbk
Dwi Sutarto, ST
Project Manager
PT. JASA MARGA PANDAAN - MALANG
Gedung Graha Simatupang Wing 2B
Jl. T.B. Simatupang No.38, Jati Padang, Pasar Minggu, Jakarta Selatan
TANGG
NO REQUEST:
PENGAJUAN MEMULAI PEKERJAAN ( REQUEST ) DIAJUK
9-Nov
DATA PENDUKUNG
TENAGA PERALATAN
RUJUKAN GAMBAR KERJA
JABATAN JUMLAH ALAT UTAMA JUMLAH JENIS B
1. GSP 1 Org 1. Dump Truck 1 Unit
2. Surveyor 4 Org 2. Bulldozer 2 Unit
3. Quality Control 2 Org 3. Excavator 1 Unit
4. HSE & K3 2 Org 4. Rambu LL/RC/Flag 2 Set
5. Pekerja 2 Org 5. Alat bantu batu 1 Set
6 Operator Alat berat 3 Org 7. Lainnya
7. Sopir 1 Org
Inspector :
Lab.Technition :
CATATAN :
Satrio
Site Engineer
TANGGAL TANGGAL
DIAJUKAN PELAKSANAAN
9-Nov-16 10-Nov-16
KETERANGAN
NDUKUNG
MATERIAL
JENIS BAHAN VOLUME
PENANGGUNG JAWAB
Chief Inspector
Quality Engineer
Disetujui oleh :
Kontraktor
PT. PP (Persero) Tbk
Dwi Sutarto, ST
Project Manager
PT. JASA MARGA PANDAAN - MALANG
Gedung Graha Simatupang Wing 2B
Jl. T.B. Simatupang No.38, Jati Padang, Pasar Minggu, Jakarta Selatan
TANGG
NO REQUEST:
PENGAJUAN MEMULAI PEKERJAAN ( REQUEST ) DIAJUK
9-Nov
DATA PENDUKUNG
TENAGA PERALATAN
RUJUKAN GAMBAR KERJA
JABATAN JUMLAH ALAT UTAMA JUMLAH JENIS B
1. GSP 1 Org 1. Dump Truck 1 Unit
2. Surveyor 4 Org 2. Bulldozer 2 Unit
3. Quality Control 2 Org 3. Excavator 1 Unit
4. HSE & K3 2 Org 4. Rambu LL/RC/Flag 2 Set
5. Pekerja 2 Org 5. Alat bantu batu 1 Set
6 Operator Alat berat 3 Org 7. Lainnya
7. Sopir 1 Org
Inspector :
Lab.Technition :
CATATAN :
Satrio
Site Engineer
TANGGAL TANGGAL
DIAJUKAN PELAKSANAAN
9-Nov-16 10-Nov-16
KETERANGAN
NDUKUNG
MATERIAL
JENIS BAHAN VOLUME
PENANGGUNG JAWAB
Chief Inspector
Quality Engineer
Disetujui oleh :
Kontraktor
PT. PP (Persero) Tbk
Dwi Sutarto, ST
Project Manager
PT. JASA MARGA PANDAAN - MALANG
Gedung Graha Simatupang Wing 2B
Jl. T.B. Simatupang No.38, Jati Padang, Pasar Minggu, Jakarta Selatan
TANGG
NO REQUEST:
PENGAJUAN MEMULAI PEKERJAAN ( REQUEST ) DIAJUK
9-Nov
DATA PENDUKUNG
TENAGA PERALATAN
RUJUKAN GAMBAR KERJA
JABATAN JUMLAH ALAT UTAMA JUMLAH JENIS B
1. GSP 1 Org 1. Dump Truck 6 Unit
2. Surveyor 4 Org 2. Wheel loader 1 Unit Bahan
3. Quality Control 2 Org 3. Vibrator Roller 1 Unit Biasa
4. HSE & K3 2 Org 4. Motor Grader 1 Unit
5. Pekerja 2 Org 5. Water Tank Truck 1 Unit
6 Operator Alat berat 5 Org 6. Sheep foot 1 Unit
7. Sopir 7 Org 7. Excavator 1 Unit
8. Rambu LL/RC/Flag 2 Set
5. Alat bantu batu 1 Set
7. Lainnya
CATATAN HASIL PEMERIKSAAN
Surveyor :
Inspector :
Lab.Technition :
CATATAN :
Satrio
Site Engineer
TANGGAL TANGGAL
DIAJUKAN PELAKSANAAN
9-Nov-16 10-Nov-16
KETERANGAN
NDUKUNG
MATERIAL
JENIS BAHAN VOLUME
Bahan Urugan
Biasa
PENANGGUNG JAWAB
Chief Inspector
Quality Engineer
Disetujui oleh :
Kontraktor
PT. PP (Persero) Tbk
Dwi Sutarto, ST
Project Manager
PT. JASA MARGA PANDAAN - MALANG
Gedung Graha Simatupang Wing 2B
Jl. T.B. Simatupang No.38, Jati Padang, Pasar Minggu, Jakarta Selatan
PEKERJAAN PEMBORONGAN DAN PENYUSUNAN DESAN PEMBANGUNAN JALAN TOL PANDAAN
DAFTAR PERIKSA
Pelaksanaan
Ada Tidak Ada
1. Shop Drawing :
Peralatan
Ada Tidak Ada
10. Dump Truck :
Satrio
PROJECT OFFICER Site Engineer
NGUNAN JALAN TOL PANDAAN MALANG
FTAR PERIKSA
CATATAN
Disetujui oleh :
Kontraktor
PT. PP (Persero) Tbk
Dwi Sutarto, ST
Project Manager
PT. JASA MARGA PANDAAN - MALANG
Gedung Graha Simatupang Wing 2B
Jl. T.B. Simatupang No.38, Jati Padang, Pasar Minggu, Jakarta Selatan
PEKERJAAN PEMBORONGAN DAN PENYUSUNAN DESAN PEMBANGUNAN JALAN TOL PANDAAN
DAFTAR PERIKSA
Pelaksanaan
Ada Tidak Ada
1. Shop Drawing :
Peralatan
Ada Tidak Ada
10. Dump Truck :
Satrio
PROJECT OFFICER Site Engineer
NGUNAN JALAN TOL PANDAAN MALANG
FTAR PERIKSA
CATATAN
Disetujui oleh :
Kontraktor
PT. PP (Persero) Tbk
Dwi Sutarto, ST
Project Manager
PT. JASA MARGA PANDAAN - MALANG
Gedung Graha Simatupang Wing 2B
Jl. T.B. Simatupang No.38, Jati Padang, Pasar Minggu, Jakarta Selatan
PEKERJAAN PEMBORONGAN DAN PENYUSUNAN DESAN PEMBANGUNAN JALAN TOL PANDAAN
DAFTAR PERIKSA
Pelaksanaan
Ada Tidak Ada
1. Shop Drawing :
Peralatan
Ada Tidak Ada
10. Dump Truck :
Satrio
PROJECT OFFICER Site Engineer
NGUNAN JALAN TOL PANDAAN MALANG
FTAR PERIKSA
CATATAN
Disetujui oleh :
Kontraktor
PT. PP (Persero) Tbk
Dwi Sutarto, ST
Project Manager
PT. JASA MARGA PANDAAN - MALANG
Gedung Graha Simatupang Wing 2B
Jl. T.B. Simatupang No.38, Jati Padang, Pasar Minggu, Jakarta Selatan
PEKERJAAN PEMBORONGAN DAN PENYUSUNAN DESAN PEMBANGUNAN JALAN T
DAFTAR PERIKSA
Pelaksanaan
Ada Tidak Ada
1. Shop Drawing :
Peralatan
Ada Tidak Ada
10. Dump Truck :
Satrio
PROJECT OFFICER Site Engineer
N PEMBANGUNAN JALAN TOL PANDAAN MALANG
DAFTAR PERIKSA
CATATAN
Diperiksa oleh : Disetujui oleh :
Konsultan Perencana Kontraktor
PT. WIRANUSANTARA BUMI PT. PP (Persero) Tbk
Dwi Sutarto, ST
Site Engineer Project Manager
SATUAN KERJA PELAKSANAAN JALAN BEBAS HAMBATAN SOLO - KERTOSONO KONTRAKTOR :
LOKASI KANAN
URAIAN
KANAN KIRI
SKETSA
TANDA TANGAN
SATUAN KERJA PELAKSANAAN JALAN BEBAS HAMBATAN SOLO - KERTOSONO KONTRAKTOR : PT. MODER
PAKET PEMBANGUNAN FO KERETA API DAN JALAN TOL SOKER KONSULTAN : PT. NUSVE
TAHUN ANGGARAN 2013
LOKASI KANAN
URAIAN CATAT
TANGGAL JAM
KIRI
CATATAN
TANDA TANGAN
KEMENTERIAN PEKERJAAN UMUM
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PELAKSANAAN JALAN BEBAS HAMBATAN SOLO - KERTOS
Jl. MT. Haryono Gg. Rajawali No. 4, Manahan, Solo, Jawa Tengah Telp.(0271)731957, Fax(02
NO : TANGGA
PENGAJUAN PENGUKURAN VALIDASI
30-Dec
Diajukan Oleh
Kontraktor
TANGGAL : JAM :
30-Dec-99
LOKASI
KANAN KIRI
HASIL PEMERIKSAAN
AWC
ACC
NA
PARAF
meriksaan
setujuan