PROJECT OVERVIEW

PROYEK TOLL TRANS SUMATERA


PT. PP (Persero) Tbk (Tanggal 20 November 2015)

RUAS BAKAUHENI – SIDOMULYO STA 0+000 S/D STA 39+400


DATA TEKNIS BAKAUHENI – SIDOMULYO (STA 0+000 – STA 39+400)

NO DATA SECTION 1
1 PANJANG RUAS 39,40 km'
2 KECEPATAN RENCANA 60 km / jam, 100 km/jam
3 LEBAR RUMIJA 120 m
4 JUMLAH LAJUR AWAL (INITIAL STAGE) 2x2
5 JUMLAH LAJUR PERUBAHAN (FINAL STAGE) 2x3
6 ARAH PELEBARAN ke luar
7 LEBAR LAJUR 2 x 3,6
8 LEBAR BAHU DALAM 1,5 m
9 LEBAR BAHU LUAR 3m
10 LEBAR MEDIAN 2,5 m
11 JUMLAH SIMPANG SUSUN 3
    SS Bakauheni STA 008+878 - Akses = 0,35 km - Ramp = 3,27 km
    SS Kalianda STA 022+500 - Akses = 0,978 km - Ramp = 2,656 km
    SS Sidomulyo STA 038+975 - Akses = 2,58 km - Ramp = 2,923 km
12 PERKERASAN LAJUR UTAMA Perkerasan Kaku
    Rigid 30cm, Lc = 10 cm, Drainage Layer = 20 cm
13 PERKERASAN BAHU JALAN lentur
14 JUMLAH OVERPASS 18 buah
15 JUMLAH UNDERPASS 4 buah
16 JEMBATAN 3 buah
17 JUMLAH JPO  
18 BARRIER GATE 1 buah STA 3+500
CL

SEE DETAIL “A”

RIGID PAVEMENT T=30 cm


ATB = 10 cm WET LEAN CONCRETE T=10 cm
DETAIL “A” AGG.BASE CLASS A = 30 cm

Keterangan :
TIPIKAL POTONGAN MELINTANG PADA JALAN UTAMA a.Jumlah Jalur 2
b.Lebar lajur tol
Jalur

TAHAP AKHIR DAERAH TIMBUNAN utama 4 x 3,6 meter


c.Lebar bahu luar 2 x 3,0 meter
d.Lebar bahu dalam 2 x 1,5 meter
e.Lebar median 2,5 meter
64,80 m 50,00 m 26,60 m
DAERAH JALAN TOL DAERAH SUTET DAN JALAN KA DAERAH LERENG TIMBUNAN

Keterangan :

a.Jumlah Jalur 2 Jalur


b.Lebar lajur tol
utama 4 x 3,6 meter
c.Lebar bahu luar 2 x 3,0 meter
d.Lebar bahu dalam 2 x 1,5 meter
e.Lebar median 2,5 meter

TIPIKAL POTONGAN MELINTANG PADA JALAN UTAMA TAHAP AKHIR


AKHIR PAKET
STA 39+400
PETA LOKASI PROYEK
IC SIDOMULYO PROYEK TOL BAKAUHENI – SIDOMULYO
STA 38+976 STA 0+000 S/D STA 39+400
LA

OVER BRIDGE : 40 BUAH UNDER BRIDGE : 7 BUAH


MP
NGU

IC KALIANDA
STA 22+400

JALAN
JALAN TRANS
TRANS BOX CULVERT : 56 BUAH J P O : 10 BUAH
SUMATERA
SUMATERA

IC BAKAUHENI
STA 8+874

KEY PLAN
RIGID : 168.000 m2 PIPE CULVERT : 100 BUAH

SUMATERA
SUMATERA
BAKAUHENI

BAKAUHENI

AWAL PAKET
JAWA PEK. GALIAN : 13 juta m3 PEK. TIMBUNAN : 11 juta m3
STA 0+000
AKHIR PAKET
STA 39+400 (AKHIR ZONA 3)
IC SIDOMULYO
STA 38+976 STA 27+900 (AKHIR ZONA 2
/ AWAL ZONA 3)
ZONA 3

LL ==
1111
,,55
kkm
IC KALIANDA

m
STA 22+400

SITE OFFICE
SITE OFFICE SECTION
SECTION 22
ZONA 2 (STA 20+000)
(STA 20+000)

LL ==
1144
,,44
kkm
m
IC BAKAUHENI STA 13+500 (AKHIR ZONA
1/ AWAL ZONA 2)
SITE OFFICE
SITE OFFICE SECTION
SECTION 1.C
1.C (STA
(STA 30+000)
30+000) STA 8+874
ZONA 1

LL ==
LOKASI SITE
LOKASI SITE OFFICE
OFFICE

1133
,,44
kkm
m AWAL PAKET
SITE OFFICE
SITE OFFICE SECTION
SECTION 1.A
1.A (STA
(STA 0+000)
0+000) STA 0+000 (AWAL ZONA 1)
AKHIR PAKET
STA 39+400 (AKHIR ZONA 3)
IC SIDOMULYO
STA 38+976
14 UNIT
JEMBATAN

ZZOO
STA 27+900 (AKHIR ZONA

NNAA
2/ AWAL ZONA 3)

33
IC KALIANDA
STA 22+400

STA 13+500 (AKHIR ZONA


23 UNIT 1 / AWAL ZONA 2)
JEMBATAN

ZZOO
NNAA
TOTAL RENCANA JUMLAH JEMBATAN

22
IC BAKAUHENI
ZONA STA 8+874
NO URAIAN SAT KET
1 2 3
10 UNIT
1 JEMBATAN JALAN DESA unit 6 9 8  
JEMBATAN
2 JEMBATAN PEDESTRIAN unit 1 8 1  
3 JEMBATAN JALAN NASIONAL unit 1 2 -

ZZOO
 

NNAA
4 JEMBATAN JALAN KABUPATEN unit 1 1 -  

11
5 JEMBATAN I/C RAMP unit 1 - 1  
6 JEMBATAN SUNGAI UNDERPASS unit - 3 4  
    TOTAL JUMLAH JEMBATAN / ZONA (unit) 10 23 14   AWAL PAKET
STA 0+000 (AWAL ZONA 1)
AKHIR PAKET
STA 39+400 (AKHIR ZONA 3)
IC SIDOMULYO
STA 38+976
10 UNIT
BOX

ZZOO
STA 27+900 (AKHIR ZONA 2

NNAA
/ AWAL ZONA 3)

33
IC KALIANDA
STA 22+400

STA 13+500 (AKHIR ZONA


38 UNIT 1 / AWAL ZONA 2)
BOX

ZZOO
NNAA
22
TOTAL RENCANA JUMLAH BANGUNAN BOX IC BAKAUHENI
STA 8+874
SAT
NO URAIAN SAT KET 18 UNIT
1 2 3
BOX
1 BOX CULVERT unit 7 32 7  

ZZOO
2 UNDERPASS BOX JALAN DESA unit 7 - -  

NNAA
3 BOX JALAN KABUPATEN unit 1 - -

11
 
4 UNDERPASS BOX PEDESTRIAN unit 3 6 3  
    TOTAL JUMLAH BOX / ZONA (unit) 18 38 10  
AWAL PAKET
STA 0+000 (AWAL ZONA 1)
Kondisi Pembebasan Lahan
s/d tanggal 20 November 2015

• STA 0+000 s/d 1+025


1. Masih Sisa 10 bidang yang disengketakan Yunus Cs Vs Sahrudin (2.500 M2) Solusi :
dilakukan Konsinyasi di Pengadilan
2. STA 0+650 ada 5 makam yang belum di relokasi dikarnakan tidak ada ahli warisnya

• STA 1+025 s/d 3+600


1. Bentuk ganti rugi lahan sudah sepakat
2. Senin 24 November 2015 dilakukan pembayaran yang akan diselenggarakan di Menara Siger

• STA 3+600 s/d 8+900


Senin, Rabu Kamis 23 November 2015 s/d 26 November 2015 akan dilakukan proses musyawarah bentuk
ganti rugi di Kantor Kecamatan

• STA 8+900 s/d 23+000


1. Sedang pelaksanaan pengukuran 28 September s/d 28 Oktober 2015, inventarisasi dimulai tanggal 10
Oktober 2015 s/d 28 Oktober 2015
2. STA 8+900 s/d 12+000 sudah pengumuman inventarisasi di dua Desa
3. Pengumuman selesai tanggal 17 November 2015
4. Rencana musyawarah minggu ke- 3 November 2015 dan untuk ganti rugi tanggal 2 Desember 2015
Kondisi Pembebasan Lahan
s/d Tanggal 20 November 2015

STA 23+000 s/d 38+000 dan STA. 38+000 S/D 39+400


1.Sedang pelaksanaan pengukuran 28 September s/d 28 Oktober 2015, inventarisasi dimulai tanggal 10
Oktober 2015 s/d 28 Oktober 2015
2.Rencana musyawarah minggu ke 3 November 2015 dan untuk ganti rugi tanggal 2 Desember 2015
MONITORING PENGADAAN LAHAN PROYEK TOL TRANS SUMATERA
s/d TANGGAL 20 November 2015

Realisasi tanggal
13 November 2015
SCHEDULE PENGADAAN TANAH JALAN TOL BAKAUHENI – TERBANGGI BESAR
SEKSI I ( PROGRESS PER 20 NOVEMBER 2015 )
Pekerjaan Tanah: Rencana Kerja
Rencana Kerja Sta.
Sta. 0+000
0+000 s/d
s/d 1+075
1+075
1.Clearing & Pembongkaran, Vol 4.650 m2, 11/10/2015 - 31/10/2015
2.Galian Biasa untuk di buang, Vol 3.500 m3, 11/10/2015 – 17/10/2015 CUTTING
3.Galian Biasa untuk ditimbun, Vol 1.272 m3, 11/10/2015 – 31/10/2015 1+075
4.Timbunan Tanah, Vol 765.870 m3, 11/10/2015 – 16/01/2015 FILL
FILL //
TIMBUNAN
5.Timbunan material pilihan, Vol 4.200 m3, 11/10/2015 – 24/10/2015 0+675 s/d 0+725

21 m
FILL / TIMBUNAN
(EKSISTING
(EKSISTING PROGRESS)
PROGRESS) TANAH EKSISTING

17 m
FILLING
- 0+298

12 m
2m

FILLING

LOKASI PAK
0+075 YUNUS (BELUM
YUNUS (BELUM 0+400
BEBAS)

AREA TRANSISI DG ASDP PROGRESS S/D SAAT INI LAHAN BARU BEBAS (SUDAH STRIPPING) BELUM BEBAS (CUTTING)

Pekerjaan Struktur : Pekerjaan Perkerasan:


1.Pekerjaan Subdrain, Vol 90 m’ : Start 11/10/2015 s/d 24/10/2015 1.Pekerjaan Agregate Base A, Vol 7.800 m3, 10/12/2015 - 20/02/2016
2.Pekerjaan Gorong-gorong, Vol 165 m’ : 11/10/2015 s/d 12/12/2015 2.Pekerjaan Lantai Kerja, Vol 26.000 m2, 17/12/2015 – 27/02/2016
3.Pekerjaan Box Culvert, Vol 100 m’ : 01/11/2015 s/d 16/01/2016 3.Pekerjaan Cor Rigid, Vol 7.800 m3, 24/12/2015 – 07/03/2016
4.Box Culvert Pedestrian, Vol 65 m’ : 08/11/2015 s/d 06/02/2015
RENCANA KERJA STA 0+000 SD 1+000
Sisa Pekerjaan sd tanggal 20 Oktober 2015
RENCANA KERJA STA 0+000 SD 1+000
Sisa Pekerjaan sd tanggal 20 Oktober 2015
RENCANA KERJA KONSTRUKSI 24 BULAN
RUAS BAKAUHENI - SIDOMULYO (STA 0+000 S/D STA 39+400 )
VOLUME PEKERJAAN TOL BAKAUHENI – SIDOMULYO S/D TGL 20 NOVEMBER 2015
REKAP MINGGUAN VOLUME SELURUH PEKERJAAN
TOL BAKAUHENI – SIDOMULYO S/D TGL 20 NOVEMBER 2015
STRIP MAP PEKERJAAN TOL TRANS SUMATERA
S/D TGL 20 NOVEMBER 2015
JUMLAH DAN AKTIVITAS ALAT BERAT
DAN DAFTAR PERSONIL YANG SUDAH STAND BY DI LOKASI PROYEK

NO URAIAN SAT JUMLAH


No URAIAN SAT JUMLAH AKTIF STANDBY KET NO URAIAN SAT JUMLAH
1 GM org 1
Excavator PC
1 Unit 4 3 1  
2 PM org 1 13 Logistik org 1
200
Excavator PC 3 SEM org 1 14 Pelaksana org 1
2 Unit 1 1 0  
480 15 Surveyor org 3
4 SAM org 1
3 Bulldozer Unit 3 2 1  
16 Ass Surveyor org 9
5 GA org 1
4 Vibro Roller Unit 3 2 1   17 Peralatan org 2
6 Staf Teknik org 2
5 Dump Truck Unit 25 24 1   18 OB org 1
7 POP org 1
6 Water Tank Unit 1 1 0   19 Keamanan org 4
8 GSP org 1
7 Sheep Foot Unit 2 2 0   20 SHEO org 1
9 QS org 4 21 SS org 1
8 Grader Unit 1 0 1  
10 Drafter org 5
9  Pick Up  Unit  2 2  0    11 Chief Surveyor org 1
12 QC org 1
         
RENCANA INTERCHANGE
RENCANA INTERCHANGE TOL
TOL TRANS
TRANS SUMATERA
SUMATERA TERHADAP
TERHADAP GERBANG
GERBANG ASDP
ASDP
LONG SECTION
LONG SECTION STA
STA -0+298
-0+298 S/D
S/D 1+075
1+075

CUTTING
1+075
FILL /
TIMBUNAN
0+675
0+675 s/d
s/d 0+725
0+725

22 m
FILL
FILL // TIMBUNAN
TIMBUNAN
(EKSISTING
(EKSISTING PROGRESS)
PROGRESS) TANAH EKSISTING

15 m
FILLING
- 0+298
20 m
7m
26,7 m

FILLING

LOKASI
LOKASI PAK
PAK
0+075 YUNUS (BELUM 0+400
BEBAS)

AREA TRANSISI DG ASDP PROGRESS S/D SAAT INI LAHAN BARU BEBAS (SUDAH STRIPPING) BELUM BEBAS (CUTTING)

LAHAN SUDAH BELUM BEBAS (FILLING / TIMBUNAN)


FOTO PEKERJAAN
FOTO PEKERJAAN TIMBUNAN
TIMBUNAN TANAH
TANAH TINGGI
TINGGI 15-16
15-16 METER
METER

TINGGI TIMBUNAN
16 METER
FOTO PEKERJAAN
FOTO PEKERJAAN TIMBUNAN
TIMBUNAN TANAH
TANAH TINGGI
TINGGI 15-16
15-16 METER
METER

TINGGI TIMBUNAN
16 METER

TINGGI TIMBUNAN
16 METER

TINGGI TIMBUNAN
TINGGI TIMBUNAN 16 METER
16 METER
Timbunan Tanah
Timbunan Tanah STA
STA Timbunan Tanah
Timbunan Tanah STA
STA
00+100 Center
00+100 Center Line
Line 00+100 (Right
00+100 (Right Side)
Side)

Timbunan Tanah
Timbunan Tanah STA
STA
00+100 (Left
00+100 (Left Side)
Side)
Timbunan Tanah
Timbunan Tanah STA
STA Timbunan Tanah
Timbunan Tanah STA
STA
00+200 Center
00+200 Center Line
Line 00+200 (Right
00+200 (Right Side)
Side)

Timbunan Tanah
Timbunan Tanah STA
STA
00+200 (Left
00+200 (Left Side)
Side)
Timbunan Tanah
Timbunan Tanah STA
STA Timbunan Tanah
Timbunan Tanah STA
STA
00+300 Center
00+300 Center Line
Line 00+300 (Right
00+300 (Right Side)
Side)

Timbunan Tanah
Timbunan Tanah STA
STA
00+300 (Left
00+300 (Left Side)
Side)
FOTO PEKERJAAN
FOTO PEKERJAAN AKSES
AKSES JALAN
JALAN WARGA
WARGA STA
STA 0+000
0+000 S/D
S/D 0+375
0+375
FOTO JALAN
FOTO JALAN AKSES
AKSES SEMENTARA
SEMENTARA STA
STA 0+875
0+875

FOTO JALAN
FOTO JALAN AKSES
AKSES SEMENTARA
SEMENTARA STA
STA 01+025
01+025
JALAN AKSES
JALAN AKSES SEMENTARA
SEMENTARA STA
STA 0+750
0+750
STA 0+500
STA 0+500 STA 0+525
STA 0+525

STA 0+550
STA 0+550 STA 0+575
STA 0+575
TIMBUNAN TANAH
TIMBUNAN TANAH STA
STA 0+600
0+600 TIMBUNAN TANAH
TIMBUNAN TANAH STA
STA 0+625
0+625

MAKAM STA
MAKAM STA 0+650
0+650
TIMBUNAN TANAH
TIMBUNAN TANAH STA
STA 0+675
0+675 TIMBUNAN TANAH
TIMBUNAN TANAH STA
STA 0+700
0+700

TIMBUNAN TANAH
TIMBUNAN TANAH STA
STA 0+725
0+725 AKSES SEMENTARA
AKSES SEMENTARA STA
STA 0+750
0+750
TIMBUNAN TANAH
TIMBUNAN TANAH STA
STA 0+800
0+800 TIMBUNAN TANAH
TIMBUNAN TANAH STA
STA 0+825
0+825

TIMBUNAN TANAH
TIMBUNAN TANAH STA
STA 0+850
0+850 GALIAN DRAINASE
GALIAN DRAINASE STA
STA 0+850
0+850
TEST KEPADATAN
TEST KEPADATAN TANAH
TANAH TEST KEPADATAN
TEST KEPADATAN TANAH
TANAH
STA 0+675
STA 0+675 (LAYER
(LAYER 16)
16) STA 0+700
STA 0+700 (LAYER
(LAYER 16)
16)

TEST KEPADATAN
TEST KEPADATAN TANAH
TANAH TEST KEPADATAN
TEST KEPADATAN TANAH
TANAH
STA 0+725
STA 0+725 (LAYER
(LAYER 16)
16) STA 0+850
STA 0+850 (LAYER
(LAYER 5)
5)
FOTO PEKERJAAN
FOTO PEKERJAAN GORONG-GORONG
GORONG-GORONG STA
STA 0+675
0+675

FOTO PEKERJAAN
FOTO PEKERJAAN GORONG-GORONG
GORONG-GORONG STA
STA 0+750
0+750
FOTO PEKERJAAN
FOTO PEKERJAAN GALIAN
GALIAN SALURAN
SALURAN STA
STA 0+925
0+925

FOTO PEKERJAAN
FOTO PEKERJAAN JALAN
JALAN AKSES
AKSES STA
STA 0+975
0+975
FOTO PROYEK
FOTO PROYEK TAMPAK
TAMPAK ATAS
ATAS STA
STA 0-148
0-148 s/d
s/d 0+800
0+800
GUDANG BESI
GUDANG BESI (( ZONA
ZONA 22 ))

BAR BENDING
BAR BENDING PEMBESIAN
PEMBESIAN
FOTO PEKERJAAN
FOTO PEKERJAAN PERSIAPAN
PERSIAPAN BATCHING
BATCHING PLAN
PLAN STA
STA 4+725
4+725
Terima Kasih …
TOLL TRANS SUMATERA RUAS BAKAUHENI – SIDOMULYO