PEMERINTAH KABUPATEN KUTAI KARTANEGARA

DINAS PEKERJAAN UMUM


Alamat : Jln. Wolter Monginsidi (Komplek Perkantoran Bupati Kutai Kartanegara)
TENGGARONG

PROGRAM :
PROGRAM PEMBANGUNAN/PENINGKATAN JALAN DAN JEMBATAN

BACK UP
BACK UP DATA VOLUME

KEGIATAN :
SEMENISASI JALAN TEMBUS RT. 13 JONGGON JAYA B

(KECAMATAN LOA KULU)

SUMBER DANA :
APBD KABUPATEN KUTAI KARTANEGARA

TAHUN ANGGARAN 2020


PERHITUNGAN VOLUME PENYIAPAN BADAN JALAN

PROGRAM : PROGRAM PEMBANGUNAN/PENINGKATAN JALAN DAN JEMBATAN


KEGIATAN : SEMENISASI JALAN TEMBUS RT. 13 JONGGON JAYA B
LOKASI : DESA JONGGON JAYA B KEC. LOA KULU

PEKERJAAN : PENYIAPAN BADAN JALAN


: SECTION 1

SKETSA
LEBAR LEBAR
LEBAR VOLUME
JALAN JUMLAH RATA- VOLUME
JALAN JARAK
No. STATION SISI LEBAR KUMULATIF SATUAN
SISI KIRI RATA (m) 3
(m )
KANAN (m) 2 (m3)
(m) (m )
(m)
A B E I J = ((G+H):2)x I K = (F1+J1):2 L M = (KxL) N O

1 S T A.0+ 000 1.00 1.00 2.00


2
3.05 10.00 30.50 30.50 M
2 S T A.0+ 010 1.00 3.10 4.10
2
3.19 15.00 47.78 78.28 M
3 S T A.0+ 025 1.17 1.10 2.27
2.99 25.00 74.63 152.90 M2
4 S T A.0+ 050 1.50 2.20 3.70
3.65 25.00 91.25 244.15 M2
5 S T A.0+ 075 1.30 2.30 3.60
2.80 25.00 70.00 314.15 M2
6 S T A.0+ 100 1.00 1.00 2.00
2.00 1.20 2.40 316.55 M2
7 S T A.0+ 101.2 1.00 1.00 2.00
JEMBATAN 1
8 S T A.0+ 108.8 1.20 1.00 2.20
2
2.20 16.20 35.64 352.19 M
9 S T A.0+ 125 1.20 1.00 2.20
2
2.40 25.00 60.00 412.19 M
10 S T A.0+ 150 1.00 1.60 2.60
2
2.35 25.00 58.75 470.94 M
11 S T A.0+ 175 1.10 1.00 2.10
2
2.10 25.00 52.50 523.44 M
12 S T A.0+ 200 0.90 1.20 2.10
2.13 25.00 53.13 576.57 M2
13 S T A.0+ 225 1.35 0.80 2.15
2.04 25.00 51.00 627.57 M2
14 S T A.0+ 250 1.07 0.86 1.93
2.09 22.50 47.03 674.59 M2
15 S T A.0+ 272.5 1.40 0.85 2.25
JEMBATAN 2
16 S T A.0+ 282 1.40 0.85 2.25
2.32 18.00 41.67 716.26 M2
17 S T A.0+ 300 1.13 1.25 2.38
2.94 25.00 73.50 789.76 M2
18 S T A.0+ 325 2.00 1.50 3.50
3.75 16.00 60.00 849.76 M2
19 S T A.0+ 341 1.67 2.33 4.00

VOLUME PENYIAPAN BADAN JALAN SECTION 1 849.760 M2


PERHITUNGAN VOLUME PENYIAPAN BADAN JALAN

PROGRAM : PROGRAM PEMBANGUNAN/PENINGKATAN JALAN DAN JEMBATAN


KEGIATAN : SEMENISASI JALAN TEMBUS RT. 13 JONGGON JAYA B
LOKASI : DESA JONGGON JAYA B KEC. LOA KULU

PEKERJAAN : PENYIAPAN BADAN JALAN


: SECTION 2

SKETSA
LEBAR LEBAR
LEBAR VOLUME
JALAN JUMLAH RATA- VOLUME
JALAN JARAK
No. STATION SISI LEBAR KUMULATIF SATUAN
SISI KIRI RATA (m) 3
(m )
KANAN (m) 2 (m3)
(m) (m )
(m)
A B E I \ K = (F1+J1):2 L M = (KxL) N O

1 S T A.0+ 000 1.25 1.25 2.50


2
2.50 7.00 17.50 17.50 M
2 S T A.0+ 007 1.25 1.25 2.50
2.50 18.00 45.00 62.50 M2
3 S T A.0+ 25 1.25 1.25 2.50
2.50 25.00 62.50 125.00 M2
4 S T A.0+ 050 1.25 1.25 2.50
2
2.50 25.00 62.50 187.50 M
5 S T A.0+ 075 1.25 1.25 2.50
2.50 25.00 62.50 250.00 M2
6 S T A.0+ 100 1.25 1.25 2.50
2.50 25.00 62.50 312.50 M2
7 S T A.0+ 125 1.25 1.25 2.50
2.50 25.00 62.50 375.00 M2
8 S T A.0+ 150 1.25 1.25 2.50
2.50 25.00 62.50 437.50 M2
9 S T A.0+ 175 1.25 1.25 2.50
2
2.50 25.00 62.50 500.00 M
10 S T A.0+ 200 1.25 1.25 2.50
2
2.50 25.00 62.50 562.50 M
11 S T A.0+ 225 1.25 1.25 2.50
2.50 17.00 42.50 605.00 M2
12 S T A.0+ 242 1.25 1.25 2.50

VOLUME PENYIAPAN BADAN JALAN SECTION 2 605.00 M2


TOTAL VOLUME PENYIAPAN BADAN JALAN SECTION 1 + SECTION 2 1,454.760 M2
PERHITUNGAN VOLUME LAPIS PONDASI AGREGAT KELAS B

PROGRAM : PROGRAM PEMBANGUNAN/PENINGKATAN JALAN DAN JEMBATAN


KEGIATAN : SEMENISASI JALAN TEMBUS RT. 13 JONGGON JAYA B
LOKASI : DESA JONGGON JAYA B KEC. LOA KULU

PEKERJAAN : LAPIS PONDASI AGREGAT KELAS B


: SECTION 1

SKETSA
SECTION KIRI SECTION KANAN
AREA
VOLUME
TEBAL TEBAL TEBAL TEBAL RATA- JARAK VOLUME
No. STATION LEBAR AREA LEBAR AREA KUMULATIF SATUAN
KIRI KANAN KIRI KANAN RATA (m) (m3)
(m) (m2) (m) (m2) (m3)
(m) (m) (m) (m) (m2)

A B C D E F = ((C+D):2)xE G H I J = ((G+H):2)x I K = (F1+J1):2 L M = (KxL) N O

1 S T A.0+ 000 0.12 0.12 1.00 0.12 0.12 0.12 1.00 0.12
3
0.49 10.00 4.86 4.86 M
2 S T A.0+ 010 0.12 0.12 1.00 0.12 0.12 0.12 3.10 0.37
3
0.63 15.00 9.42 14.28 M
3 S T A.0+ 025 0.12 0.12 1.17 0.14 0.12 0.12 1.10 0.13
0.49 25.00 12.36 26.64 M3
4 S T A.0+ 050 0.12 0.12 1.50 0.18 0.12 0.12 2.20 0.26
0.66 25.00 16.50 43.14 M3
5 S T A.0+ 075 0.12 0.12 1.30 0.16 0.12 0.12 2.30 0.28
0.55 25.00 13.80 56.94 M3
6 S T A.0+ 100 0.12 0.12 1.00 0.12 0.12 0.12 1.00 0.12
0.36 1.20 0.43 57.38 M3
7 S T A.0+ 101.2 0.12 0.12 1.00 0.12 0.12 0.12 1.00 0.12

JEMBATAN 1

8 S T A.0+ 108.8 0.12 0.12 1.20 0.14 0.12 0.12 1.00 0.12
0.40 16.20 6.42 63.79 M3
9 S T A.0+ 125 0.12 0.12 1.20 0.14 0.12 0.12 1.00 0.12
0.42 25.00 10.50 74.29 M3
10 S T A.0+ 150 0.12 0.12 1.00 0.12 0.12 0.12 1.60 0.19
3
0.44 25.00 10.95 85.24 M
11 S T A.0+ 175 0.12 0.12 1.10 0.13 0.12 0.12 1.00 0.12
0.38 25.00 9.45 94.69 M3
12 S T A.0+ 200 0.12 0.12 0.90 0.11 0.12 0.12 1.20 0.14
0.38 25.00 9.53 104.22 M3
13 S T A.0+ 225 0.12 0.12 1.35 0.16 0.12 0.12 0.80 0.10
0.37 25.00 9.35 113.56 M3
14 S T A.0+ 250 0.12 0.12 1.07 0.13 0.12 0.12 0.86 0.10
0.37 22.50 8.25 121.81 M3
15 S T A.0+ 272.5 0.12 0.12 1.40 0.17 0.12 0.12 0.85 0.10

JEMBATAN 2

16 S T A.0+ 282 0.12 0.12 1.40 0.17 0.12 0.12 0.85 0.10
0.41 18.00 7.43 129.24 M3
17 S T A.0+ 300 0.12 0.12 1.13 0.14 0.12 0.12 1.25 0.15
0.50 25.00 12.39 141.63 M3
18 S T A.0+ 325 0.12 0.12 2.00 0.24 0.12 0.12 1.50 0.18
0.66 16.00 10.56 152.19 M3
19 S T A.0+ 341 0.12 0.12 1.67 0.20 0.12 0.12 2.33 0.28

VOLUME AGREGAT B SECTION 1 152.189 M3


PERHITUNGAN VOLUME LAPIS PONDASI AGREGAT KELAS B

PROGRAM : PROGRAM PEMBANGUNAN/PENINGKATAN JALAN DAN JEMBATAN


KEGIATAN : SEMENISASI JALAN TEMBUS RT. 13 JONGGON JAYA B
LOKASI : DESA JONGGON JAYA B KEC. LOA KULU

PEKERJAAN : LAPIS PONDASI AGREGAT KELAS B


: SECTION 2

SKETSA
SECTION KIRI SECTION KANAN
AREA
VOLUME
TEBAL TEBAL TEBAL TEBAL RATA- JARAK VOLUME
No. STATION LEBAR AREA LEBAR AREA KUMULATIF SATUAN
KIRI KANAN KIRI KANAN RATA (m) (m3)
(m) (m2) (m) (m2) (m3)
(m) (m) (m) (m) (m2)

A B C D E F = ((C+D):2)xE G H I J = ((G+H):2)x I K = (F1+J1):2 L M = (KxL) N O

1 S T A.0+ 000 0.12 0.12 1.25 0.15 0.12 0.12 1.25 0.15
3
0.45 7.00 3.15 3.15 M
2 S T A.0+ 007 0.12 0.12 1.25 0.15 0.12 0.12 1.25 0.15
3
0.45 18.00 8.10 11.25 M
3 S T A.0+ 025 0.12 0.12 1.25 0.15 0.12 0.12 1.25 0.15
0.45 25.00 11.25 22.50 M3
4 S T A.0+ 050 0.12 0.12 1.25 0.15 0.12 0.12 1.25 0.15
0.45 25.00 11.25 33.75 M3
5 S T A.0+ 075 0.12 0.12 1.25 0.15 0.12 0.12 1.25 0.15
0.45 25.00 11.25 45.00 M3
6 S T A.0+ 100 0.12 0.12 1.25 0.15 0.12 0.12 1.25 0.15
0.45 25.00 11.25 56.25 M3
7 S T A.0+ 125 0.12 0.12 1.25 0.15 0.12 0.12 1.25 0.15
0.45 25.00 11.25 67.50 M3
8 S T A.0+ 150 0.12 0.12 1.25 0.15 0.12 0.12 1.25 0.15
0.45 25.00 11.25 78.75 M3
9 S T A.0+ 175 0.12 0.12 1.25 0.15 0.12 0.12 1.25 0.15
0.45 25.00 11.25 90.00 M3
10 S T A.0+ 200 0.12 0.12 1.25 0.15 0.12 0.12 1.25 0.15
0.45 25.00 11.25 101.25 M3
11 S T A.0+ 225 0.12 0.12 1.25 0.15 0.12 0.12 1.25 0.15
0.45 17.00 7.65 108.90 M3
12 S T A.0+ 242 0.12 0.12 1.25 0.15 0.12 0.12 1.25 0.15

VOLUME AGREGAT B SECTION 2 108.90 M3


TOTAL VOLUME AGREGAT B SECTION 1 + SECTION 2 261.089 M3
PERHITUNGAN VOLUME PLASTIK COR

PROGRAM : PROGRAM PEMBANGUNAN/PENINGKATAN JALAN DAN JEMBATAN


KEGIATAN : SEMENISASI JALAN TEMBUS RT. 13 JONGGON JAYA B
LOKASI : DESA JONGGON JAYA B KEC. LOA KULU

PEKERJAAN : PLASTIK COR


: SECTION 1

LEBAR RATA- VOLUME VOLUME


No. STATION LEBAR (m) PANJANG SATUAN
RATA (m3) KUMULATIF (m2)

A B C D = C1+C2/2 E G H I

1 S T A.0+ 000 13.00


2
9.50 10.00 95.00 95.00 M
2 S T A.0+ 010 6.00
5.00 15.00 75.00 170.00 M2
3 S T A.0+ 025 4.00
4.00 25.00 100.00 270.00 M2
4 S T A.0+ 050 4.00
4.00 25.00 100.00 370.00 M2
5 S T A.0+ 075 4.00
4.00 25.00 100.00 470.00 M2
6 S T A.0+ 100 4.00
4.00 1.20 4.80 474.80 M2
7 S T A.0+ 101.2 4.00
JEMBATAN 1
8 S T A.0+ 108.8 4.00
4.00 16.20 64.80 539.60 M2
9 S T A.0+ 125 4.00
4.00 25.00 100.00 639.60 M2
10 S T A.0+ 150 4.00
4.00 25.00 100.00 739.60 M2
11 S T A.0+ 175 4.00
2
4.00 25.00 100.00 839.60 M
12 S T A.0+ 200 4.00
4.00 25.00 100.00 939.60 M2
13 S T A.0+ 225 4.00
2
4.00 25.00 100.00 1,039.60 M
14 S T A.0+ 250 4.00
2
4.00 22.50 90.00 1,129.60 M
15 S T A.0+ 272.5 4.00
JEMBATAN 2
16 S T A.0+ 282 4.00
2
4.00 18.00 72.00 1,201.60 M
17 S T A.0+ 300 4.00
4.00 25.00 100.00 1,301.60 M2
18 S T A.0+ 325 4.00
4.00 16.00 64.00 1,365.60 M2
19 S T A.0+ 341 4.00

3
VOLUME PLASTIK COR SECTION 1 1,365.600 M
PERHITUNGAN VOLUME PLASTIK COR

PROGRAM : PROGRAM PEMBANGUNAN/PENINGKATAN JALAN DAN JEMBATAN


KEGIATAN : SEMENISASI JALAN TEMBUS RT. 13 JONGGON JAYA B
LOKASI : DESA JONGGON JAYA B KEC. LOA KULU

PEKERJAAN : PLASTIK COR


: SECTION 2

LEBAR RATA- VOLUME VOLUME


No. STATION LEBAR (m) PANJANG SATUAN
RATA (m3) KUMULATIF (m2)

A B C D = C1+C2/2 E G H I

1 S T A.0+ 000 5.00


2
5.00 25.00 125.00 125.00 M
2 S T A.0+ 025 5.00
2
5.00 25.00 125.00 250.00 M
3 S T A.0+ 050 5.00
5.00 25.00 125.00 375.00 M2
4 S T A.0+ 075 5.00
5.00 25.00 125.00 500.00 M2
5 S T A.0+ 100 5.00
5.00 25.00 125.00 625.00 M2
6 S T A.0+ 125 5.00
5.00 25.00 125.00 750.00 M2
7 S T A.0+ 150 5.00
5.00 25.00 125.00 875.00 M2
8 S T A.0+ 175 5.00
5.00 25.00 125.00 1,000.00 M2
9 S T A.0+ 200 5.00
5.00 25.00 125.00 1,125.00 M2
10 S T A.0+ 225 5.00
5.00 17.00 85.00 1,210.00 M2
11 S T A.0+ 242 5.00
5.00 - 1,210.00 M2
12 S T A.0+ 242 5.00
5.00 - 1,210.00 M2
13 S T A.0+ 257 5.00
6.00 - 1,210.00 M2
14 S T A.0+ 262 7.00

2
VOLUME PLASTIK COR SECTION 2 1,210.00 M
TOTAL VOLUME PLASTIK COR SECTION 1 + SECTION 2 2,575.60 M2
2 3
VOLUME PLASTIK COR / M3 BETON VOLUME BETON : 515.12 5.000 M /M
PERHITUNGAN VOLUME BAJA TULANGAN

PEKERJAAN : BAJA TULANGAN STA 0+000 s/d 0+341 (SECTION 1)


BESI MELINTANG

DIAMETER DIMENSI TOTAL JUMLAH KOEF. VOLUME


No. SKETSA SATUAN
(mm) a b c (m) (Batang) (Kg/m1) (Kg)
1 2 3 4 5 = a+b+c 6 7 8 = 5x6x7 9

BAJA TULANGAN
MELINTANG
1 TUL. MEMANJANG
a
10 3.90 3.90 8 0.617 19.250 Kg

2 BEUGEL

a c
b 12 0.10 0.15 0.10 0.35 26 0.888 8.081 Kg

3 DOWEL

16 0.60 - - 0.60 13 1.580 12.324 Kg

A VOLUME 1 SEGMENT BAJA TULANGAN = (1 + 2 + 3) 39.66 Kg


B JARAK 1 SEGMENT 5.00 m
C PANJANG JALAN 323.90 m
D JUMLAH SEGMENT = (C : B) 66.00 Bh
E VOLUME BAJA TULANGAN SECTION 1 = (A x D) 2,617.24 Kg

PEKERJAAN : BAJA TULANGAN STA 0+000 s/d 0+242 (SECTION 2)


BESI MELINTANG

DIAMETER DIMENSI TOTAL JUMLAH KOEF. VOLUME


No. SKETSA SATUAN
(mm) a b c (m) (Batang) (Kg/m1) (Kg)
1 2 3 4 5 = a+b+c 6 7 8 = 5x6x7 9

BAJA TULANGAN
MELINTANG
1 TUL. MEMANJANG
a
10 4.90 4.90 8 0.617 24.186 Kg

2 BEUGEL

a c
b 12 0.10 0.15 0.10 0.35 32 0.888 9.946 Kg

3 DOWEL

16 0.60 - - 0.60 16 1.580 15.168 Kg

A VOLUME 1 SEGMENT BAJA TULANGAN = (1 + 2 + 3) 49.30 Kg


B JARAK 1 SEGMENT 5.00 m
C PANJANG JALAN 242.00 m
D JUMLAH SEGMENT = (C : B) 49.00 Bh
E VOLUME BAJA TULANGAN SECTION 2 = (A x D) 2,415.70 Kg
F TOTAL VOLUME BAJA TULANGAN (SECTION 1 + SECTION 2) 5,032.94 Kg
G VOLUME BAJA TULANGAN / M3 BETON VOLUME BETON : 515.12 9.7704 Kg
PERHITUNGAN VOLUME PIPA PVC 1"

PEKERJAAN : PIPA PVC 1" STA 0+000 s/d 0+341 (SECTION 1)

DIAMETER DIMENSI TOTAL JUMLAH KOEF. VOLUME


No. SKETSA SATUAN
(mm) a b c (m) (Batang) (m1) (m1)
1 2 3 4 5 = a+b+c 6 7 8 = 5x6x7 9

1 PIPA PVC 1"

1" 0.30 - - 0.30 13 1.00 3.90 m1

A VOLUME 1 SEGMENT PIPA PVC 3.90 m1


B JARAK 1 SEGMENT 5.00 m
C PANJANG JALAN 323.90 m
D JUMLAH SEGMENT = (C : B) 66.00 Bh
E VOLUME PIPA PVC SECTION 1 = (A x D) 257.40 m1

PEKERJAAN : PIPA PVC 1" STA 0+000 s/d 0+242 (SECTION 2)

DIAMETER DIMENSI TOTAL JUMLAH KOEF. VOLUME


No. SKETSA SATUAN
(mm) a b c (m) (Batang) (m1) (m1)
1 2 3 4 5 = a+b+c 6 7 8 = 5x6x7 9

1 PIPA PVC 1"

1" 0.30 - - 0.30 16 1.00 4.80 m1

A VOLUME 1 SEGMENT PIPA PVC 4.80 m1


B JARAK 1 SEGMENT 5.00 m
C PANJANG JALAN 242.00 m
D JUMLAH SEGMENT = (C : B) 49.00 Bh
E VOLUME PIPA PVC SECTION 2 = (A x D) 235.20 m1
F TOTAL VOLUME PIPA PVC 1" (SECTION 1 + SECTION 2) 492.60 m1
G VOLUME PIPA PVC / M3 BETON VOLUME BETON : 515.12 0.9563 m/m3
PERHITUNGAN VOLUME PERKERASAN BETON SEMEN K-300

PROGRAM : PROGRAM PEMBANGUNAN/PENINGKATAN JALAN DAN JEMBATAN


KEGIATAN : SEMENISASI JALAN TEMBUS RT. 13 JONGGON JAYA B
LOKASI : DESA JONGGON JAYA B KEC. LOA KULU

PEKERJAAN : PERKERASAN BETON SEMEN K-300


: SECTION 1

SKETSA
SECTION
AREA RATA- VOLUME VOLUME
No. STATION TEBAL KIRI TEBAL JARAK (m) SATUAN
LEBAR (m) AREA (m2) RATA (m2) (m3) KUMULATIF (m3)
(m) KANAN (m)
A B C D E F = ((C+D):2)xE L = (K1+K2):2 M N = (LxM) O P

1 S T A.0+ 000 0.20 0.20 13.00 2.60


1.90 10.00 19.00 19.00 M3
2 S T A.0+ 010 0.20 0.20 6.00 1.20
1.00 15.00 15.00 34.00 M3
3 S T A.0+ 025 0.20 0.20 4.00 0.80
0.80 25.00 20.00 54.00 M3
4 S T A.0+ 050 0.20 0.20 4.00 0.80
0.80 25.00 20.00 74.00 M3
5 S T A.0+ 075 0.20 0.20 4.00 0.80
0.80 25.00 20.00 94.00 M3
6 S T A.0+ 100 0.20 0.20 4.00 0.80
0.80 1.20 0.96 94.96 M3
7 S T A.0+ 101.2 0.20 0.20 4.00 0.80
JEMBATAN 1
8 S T A.0+ 108.8 0.20 0.20 4.00 0.80
0.80 16.20 12.96 107.92 M3
9 S T A.0+ 125 0.20 0.20 4.00 0.80
0.80 25.00 20.00 127.92 M3
10 S T A.0+ 150 0.20 0.20 4.00 0.80
0.80 25.00 20.00 147.92 M3
11 S T A.0+ 175 0.20 0.20 4.00 0.80
0.80 25.00 20.00 167.92 M3
12 S T A.0+ 200 0.20 0.20 4.00 0.80
0.80 25.00 20.00 187.92 M3
13 S T A.0+ 225 0.20 0.20 4.00 0.80
0.80 25.00 20.00 207.92 M3
14 S T A.0+ 250 0.20 0.20 4.00 0.80
0.80 22.50 18.00 225.92 M3
15 S T A.0+ 272.5 0.20 0.20 4.00 0.80
JEMBATAN 2
16 S T A.0+ 282 0.20 0.20 4.00 0.80
0.80 18.00 14.40 240.32 M3
17 S T A.0+ 300 0.20 0.20 4.00 0.80
0.80 25.00 20.00 260.32 M3
18 S T A.0+ 325 0.20 0.20 4.00 0.80
0.80 16.00 12.80 273.12 M3
19 S T A.0+ 341 0.20 0.20 4.00 0.80

VOLUME BETON SECTION 1 273.120 M3


PERHITUNGAN VOLUME PERKERASAN BETON SEMEN K-300

PROGRAM : PROGRAM PEMBANGUNAN/PENINGKATAN JALAN DAN JEMBATAN


KEGIATAN : SEMENISASI JALAN TEMBUS RT. 13 JONGGON JAYA B
LOKASI : DESA JONGGON JAYA B KEC. LOA KULU

PEKERJAAN : PERKERASAN BETON SEMEN K-300


: SECTION 2

SKETSA
SECTION
AREA RATA- VOLUME VOLUME
No. STATION TEBAL KIRI TEBAL JARAK (m) SATUAN
LEBAR (m) AREA (m2) RATA (m2) (m3) KUMULATIF (m3)
(m) KANAN (m)
A B C D E F = ((C+D):2)xE L = (K1+K2):2 M N = (LxM) O P

1 S T A.0+ 000 0.20 0.20 5.00 1.00


1.00 25.00 25.00 25.00 M3
2 S T A.0+ 025 0.20 0.20 5.00 1.00
1.00 25.00 25.00 50.00 M3
3 S T A.0+ 050 0.20 0.20 5.00 1.00
1.00 25.00 25.00 75.00 M3
4 S T A.0+ 075 0.20 0.20 5.00 1.00
1.00 25.00 25.00 100.00 M3
5 S T A.0+ 100 0.20 0.20 5.00 1.00
1.00 25.00 25.00 125.00 M3
6 S T A.0+ 125 0.20 0.20 5.00 1.00
1.00 25.00 25.00 150.00 M3
7 S T A.0+ 150 0.20 0.20 5.00 1.00
1.00 25.00 25.00 175.00 M3
8 S T A.0+ 175 0.20 0.20 5.00 1.00
1.00 25.00 25.00 200.00 M3
9 S T A.0+ 200 0.20 0.20 5.00 1.00
1.00 25.00 25.00 225.00 M3
10 S T A.0+ 225 0.20 0.20 5.00 1.00
1.00 17.00 17.00 242.00 M3
11 S T A.0+ 242 0.20 0.20 5.00 1.00

VOLUME BETON SECTION 2 242.000 M3


TOTAL VOLUME BETON SECTION 1 + SECTION 2 515.120 M3