Anda di halaman 1dari 284

REKAPITULASI

RENCANA ANGGARAN BIAYA ( R A B )

KEGIATAN : PEMBANGUNAN GEDUNG KANTOR


PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR DPRD KABUPATEN L
LOKASI : JALAN LALU MUCHDAR NO. 1 SELONG
TAHUN ANGGARAN : 2016

NO. URAIAN PEKERJAAN

1 2

A. PEKERJAAN LANTAI DASAR (BASEMANT)


I. PEKERJAAN PENDAHULUAN/PERSIAPAN
II. PEKERJAAN TANAH DAN PASIR
III. PEKERJAAN PASANGAN DAN PLESTERAN
IV. PEKERJAAN LANTAI
V. PEKERJAAN BETON
VI. PEKERJAAN KAYU
VII. PEKERJAAN PENGUNCI DAN PENGGANTUNG
VIII. PEKERJAAN PENGECATAN

B. PEKERJAAN LANTAI 1 (SATU)


I. PEKERJAAN PASANGAN DAN PLESTERAN
II. PEKERJAAN LANTAI DAN PLAFOND
III. PEKERJAAN DINDING PARTISI
IV. PEKERJAAN ALLUMINIUM COMPOSITE PANEL
V. PEKERJAAN BETON
VI. PEKERJAAN KAYU
VII. PEKERJAAN PENGUNCI DAN PENGGANTUNG
VIII. PEKERJAAN PENGECATAN

C. PEKERJAAN LANTAI 2 (DUA)


I. PEKERJAAN PASANGAN DAN PLESTERAN
II. PEKERJAAN LANTAI DAN PLAFOND
III. PEKERJAAN BETON
IV. PEKERJAAN KAYU
V. PEKERJAAN PENGUNCI DAN PENGGANTUNG
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR DPRD KABUPATEN L
LOKASI : JALAN LALU MUCHDAR NO. 1 SELONG
TAHUN ANGGARAN : 2016

NO. URAIAN PEKERJAAN

1 2

VI. PEKERJAAN PENGECATAN

D. PEKERJAAN LANTAI 3 (TIGA)


I. PEKERJAAN PASANGAN DAN PLESTERAN
II. PEKERJAAN LANTAI DAN PLAFOND
III. PEKERJAAN BETON
IV. PEKERJAAN KAYU
V. PEKERJAAN PENGUNCI DAN PENGGANTUNG
VI. PEKERJAAN PENGECATAN

E. PEKERJAAN LANTAI 4 (EMPAT)


I. PEKERJAAN PASANGAN DAN PLESTERAN
II. PEKERJAAN LANTAI
III. PEKERJAAN BETON
IV. PEKERJAAN KAYU
V. PEKERJAAN PENGUNCI DAN PENGGANTUNG
VI. PEKERJAAN KONSTRUKSI ATAP
VII. PEKERJAAN PENGECATAN

F. PEKERJAAN PLANK NAMA DAN GAPURA


I. PEKERJAAN TANAH DAN PASIR
II. PEKERJAAN PASANGAN DAN PLESTERAN
III. PEKERJAAN BETON
IV. PEKERJAAN PLANK NAMA
V. PEKERJAAN PENGECATAN

G. PEKERJAAN PINTU GERBANG DAN POS JAGA


I. PEKERJAAN TANAH DAN PASIR
II. PEKERJAAN PASANGAN DAN PLESTERAN
III. PEKERJAAN LANTAI DAN PLAFOND
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR DPRD KABUPATEN L
LOKASI : JALAN LALU MUCHDAR NO. 1 SELONG
TAHUN ANGGARAN : 2016

NO. URAIAN PEKERJAAN

1 2

IV. PEKERJAAN BETON


V. PEKERJAAN STAINLESSTEEL DAN ALLUMINIUM
VI. PEKERJAAN PENGECATAN
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR DPRD KABUPATEN L
LOKASI : JALAN LALU MUCHDAR NO. 1 SELONG
TAHUN ANGGARAN : 2016

NO. URAIAN PEKERJAAN

1 2

H. PEKERJAAN PAGAR SAMPING KANAN DAN BELAKANG


I. PEKERJAAN TANAH DAN PASIR
II. PEKERJAAN PASANGAN DAN PLESTERAN
III. PEKERJAAN BETON
IV. PEKERJAAN PAGAR STAINLESSTEEL
V. PEKERJAAN PENGECATAN

I. PEKERJAAN PAGAR SAMPING KIRI


I. PEKERJAAN TANAH DAN PASIR
II. PEKERJAAN PASANGAN DAN PLESTERAN
III. PEKERJAAN BETON
IV. PEKERJAAN PENGECATAN

J. PEKERJAAN SARANA DAN PRASARANA LUAR


I. AREA JALAN DAN PARKIR LUAR BANGUNAN
II. PEKERJAAN DRAINASE

K. PEKERJAAN TAMBAH

A. JUMLAH TOTAL PEKERJAAN KONSTRUKSI FISIK

B. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL

I. JUMLAH TOTAL (A + B)
II. DIBULATKAN

Konsultan Pengawas
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR DPRD KABUPATEN L
LOKASI : JALAN LALU MUCHDAR NO. 1 SELONG
TAHUN ANGGARAN : 2016

NO. URAIAN PEKERJAAN

1 2

CV. Danasady Consultant

Muhamad Sapardi, ST
Team Leader

KPA Bid. Cipta Karya


DPU Kab. Lombok Timur

Hj. Kartini, ST., MH


NIP. 19631231 1991022 015
G KANTOR DPRD KABUPATEN LOMBOK TIMUR

JUMLAH HARGA KONTRAK JUMLAH HARGA CCO

3 4

Rp 6,244,977,975.12 Rp 6,252,267,524.86
Rp 45,756,456.10 Rp 45,756,456.10
Rp 614,011,626.12 Rp 617,849,697.41
Rp 781,149,819.41 Rp 816,840,445.09
Rp 567,936,178.89 Rp 546,183,631.35
Rp 3,887,413,736.57 Rp 3,791,351,367.96
Rp 31,149,295.80 Rp 30,884,221.59
Rp 28,035,275.00 Rp 27,144,275.00
Rp 289,525,587.22 Rp 376,257,430.36

Rp 5,577,159,678.87 Rp 5,558,204,889.73
Rp 561,910,110.06 Rp 581,394,558.67
Rp 991,683,870.87 Rp 966,638,732.35
Rp 194,597,968.90 Rp 202,783,526.69
Rp 580,699,375.00 Rp 627,573,703.75
Rp 2,631,195,941.33 Rp 2,567,641,572.94
Rp 210,352,307.85 Rp 214,113,768.08
Rp 115,426,683.50 Rp 112,816,748.50
Rp 291,293,421.36 Rp 285,242,278.75

Rp 4,810,840,042.52 Rp 4,724,865,362.33
Rp 474,987,225.64 Rp 488,472,055.78
Rp 963,494,274.16 Rp 954,013,959.51
Rp 2,658,244,727.94 Rp 2,586,969,381.31
Rp 226,130,043.31 Rp 227,445,383.16
Rp 176,487,801.50 Rp 146,849,801.50
G KANTOR DPRD KABUPATEN LOMBOK TIMUR

JUMLAH HARGA KONTRAK JUMLAH HARGA CCO

3 4

Rp 311,495,969.96 Rp 321,114,781.08

Rp 3,664,779,293.82 Rp 3,528,662,417.25
Rp 557,289,065.25 Rp 562,645,180.27
Rp 955,993,090.97 Rp 884,926,643.87
Rp 1,485,354,884.61 Rp 1,415,343,782.79
Rp 188,523,993.69 Rp 203,482,785.77
Rp 117,525,680.00 Rp 122,982,709.00
Rp 360,092,579.31 Rp 339,281,315.55

Rp 2,587,842,475.10 Rp 2,643,642,737.19
Rp 161,255,496.72 Rp 169,354,003.65
Rp 89,881,339.75 Rp 90,397,965.59
Rp 219,239,500.76 Rp 71,375,241.51
Rp 10,964,603.29 Rp 9,900,122.25
Rp 37,504,990.50 Rp 39,197,322.50
Rp 2,002,523,578.69 Rp 2,180,903,208.54
Rp 66,472,965.38 Rp 82,514,873.16

Rp 196,166,450.63 Rp 190,967,457.31
Rp 3,060,417.60 Rp 3,060,338.70
Rp 43,213,634.21 Rp 43,213,583.33
Rp 102,596,948.01 Rp 95,120,484.47
Rp 31,285,188.49 Rp 33,562,788.49
Rp 16,010,262.32 Rp 16,010,262.32

Rp 483,346,503.29 Rp 482,002,360.23
Rp 6,953,406.12 Rp 6,749,416.62
Rp 122,497,070.99 Rp 122,497,070.99
Rp 12,826,040.02 Rp 12,826,040.02
G KANTOR DPRD KABUPATEN LOMBOK TIMUR

JUMLAH HARGA KONTRAK JUMLAH HARGA CCO

3 4

Rp 208,957,426.99 Rp 207,817,273.44
Rp 88,442,434.59 Rp 88,442,434.59
Rp 43,670,124.58 Rp 43,670,124.58
G KANTOR DPRD KABUPATEN LOMBOK TIMUR

JUMLAH HARGA KONTRAK JUMLAH HARGA CCO

3 4

Rp 1,436,551,524.49 Rp 523,774,870.67
Rp 20,781,797.40 Rp 20,188,242.90
Rp 237,103,119.40 Rp 96,856,689.64
Rp 346,872,549.32 Rp 115,623,718.67
Rp 761,368,400.00 Rp 267,631,000.00
Rp 70,425,658.37 Rp 23,475,219.46

Rp 825,538,437.33 Rp 294,438,786.15
Rp 15,892,465.20 Rp 5,462,826.60
Rp 349,676,756.13 Rp 132,787,864.16
Rp 338,193,186.15 Rp 115,340,411.42
Rp 121,776,029.86 Rp 40,847,683.97

Rp 886,193,426.83 Rp 870,405,626.83
Rp 571,577,778.03 Rp 555,789,978.03
Rp 314,615,648.80 Rp 314,615,648.80

Rp - Rp 1,693,735,572.94

Rp 26,713,395,807.99 Rp 26,762,967,605.50

Rp 6,558,655,042.75 Rp 6,661,175,342.78

Rp 33,272,050,850.74 Rp 33,424,142,948.28
Rp 33,272,050,000.00 Rp 33,424,142,000.00
G KANTOR DPRD KABUPATEN LOMBOK TIMUR

JUMLAH HARGA KONTRAK JUMLAH HARGA CCO

3 4

Pejabat Pelaksana
Teknis Kegiatan (PPTK)

Hafid Wahyu Widodo, ST


NIP. 19771003 201001 1 007
SELISIH

5=4-3

Rp 7,289,549.74
Rp -
Rp 3,838,071.29
Rp 35,690,625.68
Rp (21,752,547.55)
Rp (96,062,368.62)
Rp (265,074.21)
Rp (891,000.00)
Rp 86,731,843.14

Rp (18,954,789.14)
Rp 19,484,448.61
Rp (25,045,138.52)
Rp 8,185,557.79
Rp 46,874,328.75
Rp (63,554,368.39)
Rp 3,761,460.24
Rp (2,609,935.00)
Rp (6,051,142.61)

Rp (85,974,680.18)
Rp 13,484,830.14
Rp (9,480,314.65)
Rp (71,275,346.64)
Rp 1,315,339.85
Rp (29,638,000.00)
SELISIH

5=4-3

Rp 9,618,811.12

Rp (136,116,876.57)
Rp 5,356,115.02
Rp (71,066,447.10)
Rp (70,011,101.82)
Rp 14,958,792.08
Rp 5,457,029.00
Rp (20,811,263.76)

Rp 55,800,262.09
Rp 8,098,506.93
Rp 516,625.84
Rp (147,864,259.26)
Rp (1,064,481.05)
Rp 1,692,332.00
Rp 178,379,629.85
Rp 16,041,907.77

Rp (5,198,993.32)
Rp (78.90)
Rp (50.88)
Rp (7,476,463.54)
Rp 2,277,600.00
Rp -

Rp (1,344,143.05)
Rp (203,989.50)
Rp -
Rp -
SELISIH

5=4-3

Rp (1,140,153.55)
Rp -
Rp -
SELISIH

5=4-3

Rp (912,776,653.82)
Rp (593,554.50)
Rp (140,246,429.75)
Rp (231,248,830.65)
Rp (493,737,400.00)
Rp (46,950,438.91)

Rp (531,099,651.18)
Rp (10,429,638.60)
Rp (216,888,891.96)
Rp (222,852,774.73)
Rp (80,928,345.89)

Rp (15,787,800.00)
Rp (15,787,800.00)
Rp -

Rp 1,693,735,572.94

Rp 49,571,797.51

Rp 102,520,300.03

Rp 152,092,097.54
Rp 152,092,000.00

Selong, April 2017


Kontraktor Pelaksana
SELISIH

5=4-3

PT. Damai Indah Utama

S. Ali Asgar, ST
Project Manager

Pengawas Utama
Bid. Cipta Karya
DPU Kab. Lombok Timur

Ali Fikri, ST
NIP. 19770202 200604 1 013
RENCANA ANGGARAN BIAYA
(RAB)
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR DPRD KABUPATEN LOM
LOKASI : JALAN LALU MUCHDAR NO. 1 SELONG
TAHUN ANGGARAN : 2016

VOLUME
NO. URAIAN PEKERJAAN
KONTRAK CCO
1 2 3 4

A. PEKERJAAN LANTAI DASAR (BASEMANT)


I. PEKERJAAN PENDAHULUAN/PERSIAPAN
1 Pek. Pembersihan Lokasi Proyek 1.000 1.000
2 Papan nama proyek Ukuran 1.20 x 2.40 m 1.000 1.000
3 Pasangan Papan Bowplank 230.000 230.000
4 Pagar Pengaman Proyek 301.000 301.000

II. PEKERJAAN TANAH DAN PASIR


1 Pek. Galian Tanah Pondasi Footplat 3,114.545 3,034.269
2 Pek. Galian Tanah Perbaikan Lahan 1,107.500 3,452.689
3 Pek. Galian Tanah Pondasi Batu Kali 143.000 160.099
4 Pek. Urugan Kembali 3,257.545 2,577.089
5 Pek. Urugan Pasir Bawah Pondasi Footplat 88.987 87.154
6 Pek. Urugan Pasir Bawah Pondasi Batu Kali 14.300 15.248
7 Pek. Urugan Pasir Bawah Lantai 221.500 221.500
8 Pek. Urugan Sirtu Lantai Basemant 664.500 0.000
9 Pek. Urugan Sirtu Jalan Dan Entrance 863.630 863.630

III. PEKERJAAN PASANGAN DAN PLESTERAN


1 Pek. Batu Kosong 28.600 30.495
2 Pek. Pas. Pondasi Batu Kali, Camp.1PC:5PS 47.190 63.197
3 Pek. Pas. Dinding Trassram 1Bt. Camp.1PC:3PS 780.125 780.125
4 Pek. Pas. Dinding Trassram 1/2Bt. Camp.1PC:3PS 191.490 137.900
5 Pek. Pas. Dinding Bata 1/2Bt. Camp.1PC:5PS 734.790 765.684
6 Pek. Plesteran Trassram Bata, Camp.1PC:3PS 1,943.230 1,836.050
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR DPRD KABUPATEN LOM
LOKASI : JALAN LALU MUCHDAR NO. 1 SELONG
TAHUN ANGGARAN : 2016

VOLUME
NO. URAIAN PEKERJAAN
KONTRAK CCO
1 2 3 4

7 Pek. Plesteran Dinding Bata, Camp.1PC:5PS 1,469.580 1,531.368


8 Pek. Plesteran Kolom Beton, Camp.1PC:5PS 518.400 630.000
9 Pek. Plesteran Balok Beton, Camp.1PC:5PS 1,158.850 900.012
10 Pek. Acian 5,090.060 6,507.194

IV. PEKERJAAN LANTAI


1 Pek. Pas. Lantai Keramik 60x60cm (Anti Slip) 969.203 963.443
2 Pek. Pas. Lantai Keramik 60x60cm 420.500 347.273
3 Pek. Pas. Lantai Keramik Tangga 17.250 17.250
4 Pek. Pas. Plint Keramik 15x60cm 336.500 442.558
5 Pek. Pas. Lantai Keramik 30x30cm 52.500 24.196
6 Pek. Pas. Lantai Keramik KM/WC 20x20cm 9.000 7.398
7 Pek. Pas. Keramik Dinding KM/WC 20x40cm 104.130 113.310
8 Pek. Rangka Plafond Besi Hollow 0.000 35.938
9 Pek. Plafond Gypsumboard t=9mm 0.000 35.938
10 Pek. List Plafond Gypsum 10cm 0.000 24.000
V. PEKERJAAN BETON
1 Pek. Lantai Kerja t=10cm, K.100 44.494 43.577
2 Pek. Beton Cor Wiremesh Lantai t=20cm, K.250 224.550 240.728
3 Pek. Pondasi Footplat FP.1=2,90m'x2,90m', K.250 78.228 84.564
4 Pek. Pondasi Footplat FP.2=2,50m'x203,00m', K.250 185.745 190.050
5 Pek. Pondasi Footplat FP.2.a=2,50x2,50m', K.250 13.000 13.575
6 Pek. Pondasi Footplat FP.3=2,00x2,00m', K.250 2.807 2.920
7 Pek. Pondasi Footplat FP.4=1,50x1,50m', K.250 6.453 7.838
8 Pek. Pondasi Footplat FP.5=1,00x1,00m', K.250 1.200 1.500
9 Pek. Pondasi Footplat Tangga =1,00x1,50m', K.250 0.544 0.550
10 Pek. Sloof Beton S.1=20x40cm', K.250 1.440 1.344
11 Pek. Sloof Beton S.2=20x30m', K.250 43.800 39.919
12 Pek. Sloof Beton S.3=15x20cm, K.250 2.030 2.030
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR DPRD KABUPATEN LOM
LOKASI : JALAN LALU MUCHDAR NO. 1 SELONG
TAHUN ANGGARAN : 2016

VOLUME
NO. URAIAN PEKERJAAN
KONTRAK CCO
1 2 3 4

13 Pek. Kolom Beton Pedstal K.1 = 60x60cm', K.250 60.840 60.840


14 Pek. Kolom Beton Pedstal K.2 = 60x60cm', K.250 1.872 1.872
15 Pek. Kolom Beton Pedstal K.3 = 60x60cm', K.250 3.744 3.744
16 Pek. Kolom Beton Pedstal K.8 = 30x30cm', K.250 1.872 1.872
17 Pek. Kolom Beton Pedstal K.10 = 15x45cm', K.250 0.702 0.702
18 Pek. Kolom Beton K.1 = 60x60cm', K.250 81.900 81.900
19 Pek. Kolom Beton K.2 = 60x60cm', K.250 2.520 2.520
20 Pek. Kolom Beton K.3 = 60x60cm', K.250 5.040 5.040
21 Pek. Kolom Beton K.8 = 30x30cm', K.250 2.520 2.520
22 Pek. Kolom Beton K.10 = 15x45cm', K.250 0.945 0.945
23 Pek. Kolom Beton Praktis KP.1 =13x13cm, K.250 3.135 2.307
24 Pek. Kolom Beton Praktis KP.2 = 15x30cm, K.250 2.205 2.048
25 Pek. Balok Beton B.1 = 25x75cm, K.250 3.375 3.150
26 Pek. Balok Beton B.3 = 25x60cm, K.250 17.775 16.725
27 Pek. Balok Beton B.4 = 25x60cm, K.250 15.525 13.995
28 Pek. Balok Beton B.5 = 25x60cm, K.250 13.650 13.035
29 Pek. Balok Beton B.7 = 25x50cm, K.250 15.450 10.000
30 Pek. Balok Beton B.8 = 25x50cm, K.250 1.500 1.350
31 Pek. Balok Beton B.9 = 25x50cm, K.250 3.000 3.104
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR DPRD KABUPATEN LOM
LOKASI : JALAN LALU MUCHDAR NO. 1 SELONG
TAHUN ANGGARAN : 2016

VOLUME
NO. URAIAN PEKERJAAN
KONTRAK CCO
1 2 3 4

32 Pek. Balok Beton B.12 = 25x50cm, K.250 3.000 2.888


33 Pek. Balok Beton B.13 = 25x50cm, K.250 4.250 3.800
34 Pek. Balok Beton B.14 = 25x50cm, K.250 0.813 0.738
35 Pek. Balok Beton B.15 = 25x40cm, K.250 0.700 0.620
36 Pek. Balok Beton B.16 = 20x45cm, K.250 12.060 11.241
37 Pek. Balok Beton B.17 = 20x45cm, K.250 10.890 10.083
38 Pek. Balok Beton B.19 = 20x40cm, K.250 0.560 1.472
39 Pek. Balok Beton B.22 = 15x30cm, K.250 0.878 0.372
40 Pek. Balok Beton BP = 15x25cm, K.250 4.800 4.190
41 Pek. Balok Bordes Tangga = 15x25cm, K.250 0.338 0.326
42 Pek. Plat Lantai Beton t=12cm, K.250 162.015 150.343
43 Pek. Plat Tangga Beton t=12cm, K.250 1.746 2.183
44 Pek. Listplank Beton t=7cm, K.250 0.794 0.794

VI. PEKERJAAN KAYU


1 Pek. Kusen Kayu, Klas I 0.543 0.533
2 Pek. Daun Pintu Panil + Kaca 5mm, Klas II 27.200 27.144
3 Pek. Daun Pintu Tripleks Lapis Alluminium 5.600 5.572

VII. PEKERJAAN PENGUNCI DAN PENGGANTUNG


1 Pek. Handle Pintu Double 10.000 10.000
2 Pek. Angker Kusen 96.000 96.000
3 Pek. Kunci Pintu Mutu Tinggi 16.000 16.000
4 Pek. Engsel Pintu 63.000 63.000
5 Pek. Expagolet 10.000 10.000
6 Pek. Grendel Pintu 16.000 16.000
7 Pek. Relling Stainlessteel Tangga 7.290 6.300
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR DPRD KABUPATEN LOM
LOKASI : JALAN LALU MUCHDAR NO. 1 SELONG
TAHUN ANGGARAN : 2016

VOLUME
NO. URAIAN PEKERJAAN
KONTRAK CCO
1 2 3 4

VIII. PEKERJAAN PENGECATAN


1 Pek. Cat Kayu 95.696 95.696
2 Pek. Cat Dinding Tembok 5,090.060 6,647.118

B. PEKERJAAN LANTAI 1 (SATU)


I. PEKERJAAN PASANGAN DAN PLESTERAN
1 Pek. Pas. Dinding Trassram 1/2Bt. Camp.1PC:3PS 278.625 222.877
2 Pek. Pas. Dinding Bata 1/2Bt. Camp.1PC:5PS 1,167.965 1,063.785
3 Pek. Plesteran Trassram Bata, Camp.1PC:3PS 278.625 222.877
4 Pek. Plesteran Dinding Bata, Camp.1PC:5PS 2,335.930 2,127.569
5 Pek. Plesteran Kolom Beton, Camp.1PC:5PS 434.667 434.667
6 Pek. Acian 3,049.222 3,071.058
7 Pek. Dinding Roster GRC t=15cm' 35.610 35.610
8 Pek. Dinding Ornament GRC t=5cm' 121.132 295.402
9 Pek. Pas. Batu Alam Palimanan Dinding Taman 190.225 190.225
10 Pek. Pas. Batu Alam Palimanan Ornamen Kolom 48.400 48.400

II. PEKERJAAN LANTAI DAN PLAFOND


1 Pek. Pas. Lantai Keramik 60x60cm (Anti Slip) 284.948 283.105
2 Pek. Pas. Lantai Keramik 60x60cm 1,401.000 1,371.630
3 Pek. Pas. Lantai Keramik Tangga 110.145 110.145
4 Pek. Pas. Plint Keramik 15x60cm 429.600 467.618
5 Pek. Pas. Lantai Keramik 30x30cm 38.625 38.625
6 Pek. Pas. Lantai Keramik KM/WC 20x20cm 15.500 15.500
7 Pek. Pas. Keramik Dinding KM/WC 20x40cm 146.300 152.244
8 Pek. Rangka Plafond Besi Hollow 1,817.085 1,684.632
9 Pek. Plafond Gypsumboard t=9mm 1,817.085 1,684.632
10 Pek. List Plafond Gypsum 10cm 625.500 625.500
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR DPRD KABUPATEN LOM
LOKASI : JALAN LALU MUCHDAR NO. 1 SELONG
TAHUN ANGGARAN : 2016

VOLUME
NO. URAIAN PEKERJAAN
KONTRAK CCO
1 2 3 4

III. PEKERJAAN DINDING PARTISI


1 Pek. Kusen Dinding Partisi Aluminium 4" 502.170 515.770
2 Pek. Daun Pintu Kaca Aluminium 23.040 24.960
3 Pek. Kaca Polos 5mm 167.456 177.554
4 Pek. Kunci Pintu 12.000 12.000
5 Pek. Engsel Pintu 36.000 36.000
6 Pek. Doorcloser 12.000 12.000
7 Pek. Cuting Sticker (Motif Sandblast) 46.719 53.586

IV. PEKERJAAN ALLUMINIUM COMPOSITE PANEL


1 Pek. Alluminium Composite Panel + Rangka 617.675 668.350
2 Pek. Logo Kab. Lombok Timur uk.55x70cm' (Acrylik) 1.000 1.000
3 Pek. Letter Set Stainlessteel t=34cm' (Type Arial Bolt) 4.000 4.000
4 Pek. Letter Set Stainlessteel t=17 & 23cm' (Type Arial Bolt 47.000 47.000
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR DPRD KABUPATEN LOM
LOKASI : JALAN LALU MUCHDAR NO. 1 SELONG
TAHUN ANGGARAN : 2016

VOLUME
NO. URAIAN PEKERJAAN
KONTRAK CCO
1 2 3 4

V. PEKERJAAN BETON
1 Pek. Kolom Beton K.4 = 50x50cm, K.250 55.463 55.463
2 Pek. Kolom Beton K.8 = 30x30cm, K.250 0.783 2.349
3 Pek. Kolom Beton K.9 = 25x25cm, K.250 0.963 0.963
4 Pek. Kolom Beton K.10 = 15x45cm, K.250 1.175 1.175
5 Pek. Kolom Beton K.11 = dia.50cm, K.250 13.662 13.666
6 Pek. Kolom Beton K.12 = dia.50cm, K.250 5.575 8.993
7 Pek. Kolom Beton Praktis KP.1 =13x13cm, K.250 7.866 7.646
8 Pek. Balok Beton B.1 = 25x75cm, K.250 3.375 3.150
9 Pek. Balok Beton B.2 = 25x75cm, K.250 4.781 4.436
10 Pek. Balok Beton B.3 = 25x60cm, K.250 18.000 17.325
11 Pek. Balok Beton B.4 = 25x60cm, K.250 17.520 15.624
12 Pek. Balok Beton B.5 = 25x60cm, K.250 11.828 9.750
13 Pek. Balok Beton B.6 = 25x50cm, K.250 3.938 3.588
14 Pek. Balok Beton B.7 = 25x50cm, K.250 5.250 4.750
15 Pek. Balok Beton B.8 = 25x50cm, K.250 3.563 3.345
16 Pek. Balok Beton B.9 = 25x50cm, K.250 1.788 1.433
17 Pek. Balok Beton B.10 = 25x60cm, K.250 8.250 7.395
18 Pek. Balok Beton B.12 = 25x50cm, K.250 8.188 8.035
19 Pek. Balok Beton B.13 = 25x50cm, K.250 12.688 12.238
20 Pek. Balok Beton B.14 = 25x50cm, K.250 0.750 0.675
21 Pek. Balok Beton B.16 = 20x45cm, K.250 20.097 19.504
22 Pek. Balok Beton B.17 = 20x45cm, K.250 7.515 7.401
23 Pek. Balok Beton B.20 = 20x40cm, K.250 3.520 2.688
24 Pek. Balok Beton B.22 = 15x30cm, K.250 5.796 5.861
25 Pek. Balok Beton BP = 15x25cm, K.250 3.375 2.940
26 Pek. Balok Praktis = 15x25cm, K.250 2.063 2.063
27 Pek. Balok Bordes Tangga = 15x25cm, K.250 1.013 0.990
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR DPRD KABUPATEN LOM
LOKASI : JALAN LALU MUCHDAR NO. 1 SELONG
TAHUN ANGGARAN : 2016

VOLUME
NO. URAIAN PEKERJAAN
KONTRAK CCO
1 2 3 4

28 Pek. Plat Lantai Beton t=12cm, K.250 208.230 193.172


29 Pek. Plat Tangga Beton t=12cm, K.250 5.346 6.683
30 Pek. Plat Sunscreen Beton t=7cm, K.250 0.963 4.788
31 Pek. Listplank Beton t=7cm, K.250 6.195 8.249

VI. PEKERJAAN KAYU


1 Pek. Kusen Kayu, Klas I 4.646 4.678
2 Pek. Daun Pintu Panil + Kaca 5mm, Klas II 49.920 49.920
3 Pek. Daun Pintu Panil, Klas II 1.920 5.760
4 Pek. Daun Pintu Tripleks Lapis Alluminium 9.800 11.200
5 Pek. Daun Jendela Kaca 5mm + Ventilasi, Klas II 114.645 114.645
6 Pek. Ventilasi Krepyak 4.883 4.883
7 Pek. Kaca Mati 5mm 32.520 32.520
8 Pek. List GRC Kusen Pintu Dan Jendela 346.600 346.600

VII. PEKERJAAN PENGUNCI DAN PENGGANTUNG


1 Pek. Handle Pintu Double 26.000 26.000
2 Pek. Kunci Pintu Mutu Tinggi 16.000 24.000
3 Pek. Engsel Pintu 81.000 111.000
4 Pek. Engsel Jendela Dan Ventilasi 342.000 342.000
5 Pek. Grendel Pintu 36.000 37.000
6 Pek. Grendel Jendela Dan Ventilasi 241.000 239.000
7 Pek. Expagolet 26.000 26.000
8 Pek. Hak Angin Jendela Dan Ventilasi 342.000 342.000
9 Pek. Angker Kusen 418.000 424.000
10 Pek. Relling Stainlessteel 39.600 29.700

VIII. PEKERJAAN PENGECATAN


1 Pek. Cat Kayu 322.790 324.554
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR DPRD KABUPATEN LOM
LOKASI : JALAN LALU MUCHDAR NO. 1 SELONG
TAHUN ANGGARAN : 2016

VOLUME
NO. URAIAN PEKERJAAN
KONTRAK CCO
1 2 3 4

2 Pek. Cat Dinding Tembok 3,049.222 3,071.058


3 Pek. Cat Plafond 1,817.085 1,684.632

C. PEKERJAAN LANTAI 2 (DUA)


I. PEKERJAAN PASANGAN DAN PLESTERAN
1 Pek. Pas. Dinding Trassram 1/2Bt. Camp.1PC:3PS 232.125 211.904
2 Pek. Pas. Dinding Bata 1/2Bt. Camp.1PC:5PS 1,366.550 1,410.240
3 Pek. Plesteran Trassram Bata, Camp.1PC:3PS 232.125 211.904
4 Pek. Plesteran Dinding Bata, Camp.1PC:5PS 2,733.100 2,820.480
5 Pek. Plesteran Kolom Beton, Camp.1PC:5PS 434.667 434.667
6 Pek. Acian 3,399.892 3,649.431

II. PEKERJAAN LANTAI DAN PLAFOND


1 Pek. Pas. Lantai Keramik 60x60cm 1,527.000 1,527.000
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR DPRD KABUPATEN LOM
LOKASI : JALAN LALU MUCHDAR NO. 1 SELONG
TAHUN ANGGARAN : 2016

VOLUME
NO. URAIAN PEKERJAAN
KONTRAK CCO
1 2 3 4

2 Pek. Pas. Lantai Keramik Tangga 110.145 110.145


3 Pek. Pas. Plint Keramik 15x60cm 804.100 804.100
4 Pek. Pas. Lantai Keramik 30x30cm 38.625 38.625
5 Pek. Pas. Lantai Keramik KM/WC 20x20cm 9.375 9.150
6 Pek. Pas. Keramik Dinding KM/WC 20x40cm 126.200 128.286
7 Pek. Rangka Plafond Besi Hollow 1,802.675 1,725.818
8 Pek. Plafond Gypsumboard t=9mm 1,802.675 1,725.818
9 Pek. List Plafond Gypsum 10cm 974.850 974.850

III. PEKERJAAN BETON


1 Pek. Kolom Beton K.5 = 50x50cm, K.250 55.463 55.463
2 Pek. Kolom Beton K.9 = 25x25cm, K.250 0.544 0.544
3 Pek. Kolom Beton K.10 = 15x45cm, K.250 1.175 1.175
4 Pek. Kolom Beton K.12 = dia.50cm, K.250 11.955 11.952
5 Pek. Kolom Beton Praktis KP.1 =13x13cm, K.250 7.646 7.646
6 Pek. Kolom Beton Praktis KP.2 = 15x30cm, K.250 0.392 0.392
7 Pek. Balok Beton B.1 = 25x75cm, K.250 3.375 4.125
8 Pek. Balok Beton B.2 = 25x75cm, K.250 0.656 1.125
9 Pek. Balok Beton B.3 = 25x60cm, K.250 21.690 20.355
10 Pek. Balok Beton B.4 = 25x60cm, K.250 3.600 3.300
11 Pek. Balok Beton B.5 = 25x60cm, K.250 19.800 15.675
12 Pek. Balok Beton B.7 = 25x50cm, K.250 1.413 1.283
13 Pek. Balok Beton B.9 = 25x50cm, K.250 0.750 0.688
14 Pek. Balok Beton B.12 = 25x50cm, K.250 17.250 15.475
15 Pek. Balok Beton B.13 = 25x50cm, K.250 25.375 25.050
16 Pek. Balok Beton B.14 = 25x50cm, K.250 0.750 0.675
17 Pek. Balok Beton B.16 = 20x45cm, K.250 10.395 10.734
18 Pek. Balok Beton B.17 = 20x45cm, K.250 15.930 15.423
19 Pek. Balok Beton B.20 = 20x40cm, K.250 4.400 4.333
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR DPRD KABUPATEN LOM
LOKASI : JALAN LALU MUCHDAR NO. 1 SELONG
TAHUN ANGGARAN : 2016

VOLUME
NO. URAIAN PEKERJAAN
KONTRAK CCO
1 2 3 4

20 Pek. Balok Beton B.22 = 15x30cm, K.250 6.935 7.947


20a Pek. Balok Beton B.21 = 20x35cm, K.250 0.000 7.700
21 Pek. Balok Beton BM.1 = 25x60cm, K.250 7.200 1.412
22 Pek. Balok Beton BP = 15x25cm, K.250 0.482 0.671
23 Pek. Balok Bordes Tangga = 15x25cm, K.250 1.013 0.990
23a Pek. Plat Beton t = 12 cm 0.000 8.805
24 Pek. Plat Lantai Beton t=12cm, K.250 198.641 180.219
25 Pek. Plat Lantai Beton Ruang Sidang t=15cm, K.250 41.681 35.600
26 Pek. Plat Tangga Beton t=12cm, K.250 5.346 6.683
27 Pek. Listplank Beton t=7cm, K.250 6.195 8.249

IV. PEKERJAAN KAYU


1 Pek. Kusen Kayu, Klas I 4.890 4.813
2 Pek. Daun Pintu Panil + Kaca 5mm, Klas II 65.280 65.280
3 Pek. Daun Pintu Panil, Klas II 5.760 5.760
4 Pek. Daun Pintu Tripleks Lapis Alluminium 5.600 5.600
5 Pek. Daun Jendela Kaca 5mm + Ventilasi, Klas II 134.760 131.960
6 Pek. Kaca Mati 5mm 22.300 59.740
7 Pek. List GRC Kusen Pintu Dan Jendela 347.600 311.250

V. PEKERJAAN PENGUNCI DAN PENGGANTUNG


1 Pek. Handle Pintu Double 34.000 34.000
2 Pek. Kunci Pintu Mutu Tinggi 24.000 24.000
3 Pek. Engsel Pintu 123.000 123.000
4 Pek. Engsel Jendela Dan Ventilasi 398.000 398.000
5 Pek. Grendel Pintu 44.000 44.000
6 Pek. Grendel Jendela Dan Ventilasi 279.000 279.000
7 Pek. Expagolet 34.000 34.000
8 Pek. Hak Angin Jendela Dan Ventilasi 398.000 398.000
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR DPRD KABUPATEN LOM
LOKASI : JALAN LALU MUCHDAR NO. 1 SELONG
TAHUN ANGGARAN : 2016

VOLUME
NO. URAIAN PEKERJAAN
KONTRAK CCO
1 2 3 4

9 Pek. Angker Kusen 462.000 466.000


10 Pek. Relling Stainlessteel 84.240 51.300

VI. PEKERJAAN PENGECATAN


1 Pek. Cat Kayu 346.280 346.280
2 Pek. Cat Dinding Tembok 3,399.892 3,649.431
3 Pek. Cat Plafond 1,802.675 1,725.818

D. PEKERJAAN LANTAI 3 (TIGA)


I. PEKERJAAN PASANGAN DAN PLESTERAN
1 Pek. Pas. Dinding Trassram 1/2Bt. Camp.1PC:3PS 232.125 232.125
2 Pek. Pas. Dinding Bata 1/2Bt. Camp.1PC:5PS 1,677.440 1,677.440
3 Pek. Plesteran Trassram Bata, Camp.1PC:3PS 232.125 232.125
4 Pek. Plesteran Dinding Bata, Camp.1PC:5PS 3,354.880 3,354.880
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR DPRD KABUPATEN LOM
LOKASI : JALAN LALU MUCHDAR NO. 1 SELONG
TAHUN ANGGARAN : 2016

VOLUME
NO. URAIAN PEKERJAAN
KONTRAK CCO
1 2 3 4

5 Pek. Plesteran Kolom Beton, Camp.1PC:5PS 369.000 369.000


6 Pek. Acian 3,956.005 4,143.840

II. PEKERJAAN LANTAI DAN PLAFOND


1 Pek. Pas. Lantai Keramik 60x60cm 1,527.000 1,527.000
2 Pek. Pas. Lantai Keramik Tangga 110.145 110.145
3 Pek. Pas. Plint Keramik 15x60cm 630.150 630.150
4 Pek. Pas. Lantai Keramik 30x30cm 38.625 38.625
5 Pek. Pas. Lantai Keramik KM/WC 20x20cm 17.378 16.875
6 Pek. Pas. Keramik Dinding KM/WC 20x40cm 126.200 128.286
7 Pek. Rangka Plafond Besi Hollow 1,862.675 1,310.756
8 Pek. Plafond Gypsumboard t=9mm 1,862.675 1,310.756
9 Pek. List Plafond Gypsum 10cm 821.250 821.250

III. PEKERJAAN BETON


1 Pek. Kolom Beton K.6 = 40x40cm, K.250 35.496 35.496
2 Pek. Kolom Beton K.9 = 25x25cm, K.250 2.756 3.006
3 Pek. Kolom Beton K.10 = 15x45cm, K.250 1.175 1.715
4 Pek. Kolom Beton Praktis KP.1 =13x13cm, K.250 13.821 13.821
5 Pek. Kolom Beton Praktis KP.2 = 15x30cm, K.250 0.392 0.572
6 Pek. Balok Beton B.4 = 25x60cm, K.250 0.975 0.915
7 Pek. Balok Beton B.5 = 25x60cm, K.250 4.875 4.575
8 Pek. Balok Beton B.7 = 25x50cm, K.250 1.375 1.225
9 Pek. Balok Beton B.10 = 25x60cm, K.250 0.900 0.840
10 Pek. Balok Beton B.11 = 25x60cm, K.250 6.300 7.560
11 Pek. Balok Beton B.12 = 25x50cm, K.250 0.688 0.763
12 Pek. Balok Beton B.13 = 25x50cm, K.250 15.625 15.125
13 Pek. Balok Beton B.14 = 25x50cm, K.250 10.750 11.100
14 Pek. Balok Beton B.16 = 20x45cm, K.250 0.585 0.549
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR DPRD KABUPATEN LOM
LOKASI : JALAN LALU MUCHDAR NO. 1 SELONG
TAHUN ANGGARAN : 2016

VOLUME
NO. URAIAN PEKERJAAN
KONTRAK CCO
1 2 3 4

15 Pek. Balok Beton B.17 = 20x45cm, K.250 2.385 2.212


16 Pek. Balok Beton B.18 = 20x45cm, K.250 2.160 2.025
17 Pek. Balok Beton B.20 = 20x40cm, K.250 13.800 13.601
18 Pek. Balok Beton B.21 = 20x35cm, K.250 5.075 0.798
19 Pek. Balok Beton B.22 = 15x30cm, K.250 1.980 0.979
20 Pek. Balok Bordes Tangga = 15x25cm, K.250 0.750 0.744
21 Pek. Plat Lantai Beton t=12cm, K.250 25.920 20.754
22 Pek. Plat Atap Beton t=12cm, K.250 75.990 73.054
23 Pek. Plat Tangga Beton t=12cm, K.250 1.782 2.228
24 Pek. Listplank Beton t=7cm, K.250 7.602 7.308

IV. PEKERJAAN KAYU


1 Pek. Kusen Kayu, Klas I 4.327 4.899
2 Pek. Daun Pintu Panil + Kaca 5mm, Klas II 72.960 72.960
3 Pek. Daun Pintu Panil, Klas II 3.840 7.648
4 Pek. Daun Pintu Tripleks Lapis Alluminium 11.200 11.200
5 Pek. Daun Jendela Kaca 5mm + Ventilasi, Klas II 70.520 70.879
6 Pek. Kaca Mati 5mm 62.210 80.187
7 Pek. List GRC Kusen Pintu Dan Jendela 198.600 151.200

V. PEKERJAAN PENGUNCI DAN PENGGANTUNG


1 Pek. Handle Pintu Double 42.000 38.000
2 Pek. Kunci Pintu Mutu Tinggi 29.000 31.000
3 Pek. Engsel Pintu 144.000 150.000
4 Pek. Engsel Jendela Dan Ventilasi 224.000 228.000
5 Pek. Grendel Pintu 58.000 50.000
6 Pek. Grendel Jendela Dan Ventilasi 40.000 118.000
7 Pek. Expagolet 38.000 38.000
8 Pek. Hak Angin Jendela Dan Ventilasi 80.000 228.000
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR DPRD KABUPATEN LOM
LOKASI : JALAN LALU MUCHDAR NO. 1 SELONG
TAHUN ANGGARAN : 2016

VOLUME
NO. URAIAN PEKERJAAN
KONTRAK CCO
1 2 3 4

9 Pek. Angker Kusen 510.000 526.000


10 Pek. Relling Stainlessteel 39.600 39.600

VI. PEKERJAAN PENGECATAN


1 Pek. Cat Kayu 331.198 336.886
2 Pek. Cat Dinding Tembok 3,956.005 4,143.840
3 Pek. Cat Plafond 1,862.675 1,310.756

E. PEKERJAAN LANTAI 4 (EMPAT)


I. PEKERJAAN PASANGAN DAN PLESTERAN
1 Pek. Pas. Dinding Bata 1/2Bt. Camp.1PC:5PS 530.640 529.340
2 Pek. Plesteran Dinding Bata, Camp.1PC:5PS 1,061.280 1,058.680
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR DPRD KABUPATEN LOM
LOKASI : JALAN LALU MUCHDAR NO. 1 SELONG
TAHUN ANGGARAN : 2016

VOLUME
NO. URAIAN PEKERJAAN
KONTRAK CCO
1 2 3 4

3 Pek. Plesteran Kolom Beton, Camp.1PC:5PS 116.000 116.000


4 Pek. Acian 1,177.280 1,471.635

II. PEKERJAAN LANTAI


1 Pek. Pas. Lantai Keramik 60x60cm 212.100 207.075
2 Pek. Pas. Lantai Keramik Tangga 26.648 26.648
3 Pek. Pas. Plint Keramik 15x60cm 63.150 108.962

III. PEKERJAAN BETON


1 Pek. Kolom Beton K.7 = 40x40cm, K.250 10.240 10.240
2 Pek. Kolom Beton K.9 = 25x25cm, K.250 0.250 0.500
3 Pek. Kolom Beton K.10 = 15x45cm, K.250 0.540 0.540
4 Pek. Kolom Beton Praktis KP.2 = 15x30cm, K.250 0.180 0.000
5 Pek. Ring Balok Beton R.1 = 25x50cm, K.250 25.438 0.000

IV. PEKERJAAN KAYU


1 Pek. Kusen Kayu, Klas I 0.059 0.214
2 Pek. Daun Pintu Panil, Klas II 5.760 3.840
3 Pek. Daun Ventilasi, Klas II 8.820 4.200

V. PEKERJAAN PENGUNCI DAN PENGGANTUNG


1 Pek. Kunci Pintu Mutu Tinggi 3.000 4.000
2 Pek. Engsel Pintu 9.000 15.000
3 Pek. Engsel Ventilasi 6.000 10.000
4 Pek. Grendel Pintu 3.000 4.000
5 Pek. Grendel Jendela Dan Ventilasi 3.000 5.000
6 Pek. Hak Angin Ventilasi 6.000 10.000
7 Pek. Angker Kusen 24.000 32.000
8 Pek. Relling Stainlessteel 38.115 38.133
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR DPRD KABUPATEN LOM
LOKASI : JALAN LALU MUCHDAR NO. 1 SELONG
TAHUN ANGGARAN : 2016

VOLUME
NO. URAIAN PEKERJAAN
KONTRAK CCO
1 2 3 4

VI. PEKERJAAN KONSTRUKSI ATAP


1 Pek. Kolom Baja Profil WF 300x150x6.5x9mm 2,476.800 2,157.960
2 Pek. Rangka Kap Baja Profil WF 300x150x6.5x9mm 18,704.000 20,749.446
3 Pek. Rangka Baja Pengaku Profil WF 300x150x6.5x9mm 1,744.000 1,999.783
4 Pek. Voute Baja Belah Profil WF 300x150x6.5x9mm 1,352.000 1,550.575
5 Pek. Gording Baja C 150.65.20.3,2mm 17,854.274 17,870.916
6 Pek. Dudukan Gording Baja Siku 50.65.5mm 349.740 767.827
7 Pek. Plat Dudukan/Landasan t = 16mm 486.691 475.373
8 Pek. Plat Pengaku Kuda- Kuda/Plat Stifner t = 8mm 1,321.184 1,321.184
9 Pek. Plat Simpul t = 12mm 56.781 56.781
10 Pek. Besi Treckstang 16mm 882.500 903.360
11 Pek. Besi Pengikat Gording/Sagrod 10mm 542.000 542.000
12 Bout Angkur 22mm (p = 550 mm) 258.000 252.000
13 Bout Mur Kuda-kuda 16mm 1,749.000 1,788.000
14 Pek. Pengelasan 4,793.900 4,707.600
15 Pek. Erection/Penyetelan 442.887 469.498
16 Pek. Rangka Usuk Reng Baja Ringan 2,280.100 2,617.681
17 Pek. Atap Genteng Keramik Kw.I 2,280.100 2,617.681
18 Pek. Bubungan Genteng Keramik Kw.I 153.500 153.500
19 Pek. Papan Calsiplank 2x2/30cm' 201.500 202.250

VII. PEKERJAAN PENGECATAN


1 Pek. Cat Kayu 14.292 8.637
2 Pek. Cat Dinding Tembok 1,177.280 1,471.635

F. PEKERJAAN PLANK NAMA DAN GAPURA


I. PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Pondasi Footplat 12.800 12.800
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR DPRD KABUPATEN LOM
LOKASI : JALAN LALU MUCHDAR NO. 1 SELONG
TAHUN ANGGARAN : 2016

VOLUME
NO. URAIAN PEKERJAAN
KONTRAK CCO
1 2 3 4

2 Pek. Galian Tanah Pondasi Batu Kali 22.652 22.652


3 Pek. Urugan Kembali 35.452 35.452
4 Pek. Urugan Pasir Bawah Pondasi Footplat 0.800 0.800
5 Pek. Urugan Pasir Bawah Pondasi Batu Kali 2.832 2.832
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR DPRD KABUPATEN LOM
LOKASI : JALAN LALU MUCHDAR NO. 1 SELONG
TAHUN ANGGARAN : 2016

VOLUME
NO. URAIAN PEKERJAAN
KONTRAK CCO
1 2 3 4

II. PEKERJAAN PASANGAN DAN PLESTERAN


1 Pek. Batu Kosong 5.663 5.663
2 Pek. Pas. Pondasi Batu Kali, Camp.1PC:5PS 8.899 8.899
3 Pek. Pas. Dinding Bata 1/2Bt. Camp.1PC:5PS 95.833 95.833
4 Pek. Plesteran Dinding Bata, Camp.1PC:5PS 191.665 191.665
5 Pek. Plesteran Kolom Beton Dan Gapura, Camp.1PC:5PS 95.760 95.760
6 Pek. Acian 287.425 287.425

III. PEKERJAAN BETON


1 Pek. Lantai Kerja t=10cm, K.100 0.800 0.800
2 Pek. Pondasi Footplat =1,00x1,00m', K.250 2.411 3.200
3 Pek. Sloof Beton =15x25cm, K.250 1.517 1.517
4 Pek. Kolom Beton K.1 = 15x25cm', K.250 1.425 1.425
5 Pek. Kolom Beton K.2 = 20x40cm', K.250 0.912 0.912
6 Pek. Kolom Beton K.3 = 15x25cm', K.250 0.735 0.735
7 Pek. Kolom Beton KP = 13x13cm', K.250 0.384 0.384
8 Pek. Kolom Beton KP.1 = 9x15cm', K.250 0.351 0.351
9 Pek. Balok Beton = 15x25cm, K.250 2.319 1.517
10 Pek. Plat Dak Gapura Dan Plank Nama t=10cm, K.250 5.485 4.834

IV. PEKERJAAN PLANK NAMA


1 Pek. Pas. Dinding Granite 60x60cm 14.000 14.000
2 Pek. Pas. Batu Tempel Palimanan 4.025 4.025
3 Pek. Logo Kab. Lombok Timur uk.55x70cm' (Acrylik) 1.000 1.000
4 Pek. Letter Set Stainlessteel uk.17cm' t=5cm'(Type Arial B 47.000 47.000
5 Pek. Letter Set Stainlessteel uk.25cm' t=5cm'(Type Arial B 4.000 4.000
6 Pek. Pagar Stainlessteel dia.3" dan 4x4cm' 11.915 13.667

V. PEKERJAAN PENGECATAN
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR DPRD KABUPATEN LOM
LOKASI : JALAN LALU MUCHDAR NO. 1 SELONG
TAHUN ANGGARAN : 2016

VOLUME
NO. URAIAN PEKERJAAN
KONTRAK CCO
1 2 3 4

1 Pek. Cat Dinding Tembok 287.425 287.425

G. PEKERJAAN PINTU GERBANG DAN POS JAGA


I. PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Pondasi Footplat 20.736 20.736
2 Pek. Galian Tanah Pondasi Batu Kali 59.976 59.976
3 Pek. Urugan Kembali 80.712 68.349
4 Pek. Urugan Pasir Bawah Pondasi Footplat 1.296 1.296
5 Pek. Urugan Pasir Bawah Pondasi Batu Kali 7.497 7.497

II. PEKERJAAN PASANGAN DAN PLESTERAN


1 Pek. Batu Kosong 14.994 14.994
2 Pek. Pas. Pondasi Batu Kali, Camp.1PC:5PS 23.562 23.562
3 Pek. Pas. Dinding Bata 1/2Bt. Camp.1PC:5PS 312.570 312.570
4 Pek. Plesteran Dinding Bata, Camp.1PC:5PS 625.140 625.140
5 Pek. Plesteran Kolom Gerbang, Camp.1PC:5PS 158.850 158.850
6 Pek. Acian 783.990 783.990

III. PEKERJAAN LANTAI DAN PLAFOND


1 Pek. Pas. Lantai Keramik 30x30cm 11.700 11.700
2 Pek. Pas. Lantai Keramik KM/WC 20x20cm 4.500 4.500
3 Pek. Pas. Keramik Dinding KM/WC 20x40cm 19.200 19.200
4 Pek. Rangka Plafond Besi Hollow 16.200 16.200
5 Pek. Plafond Gypsumboard t=9mm 16.200 16.200
6 Pek. List Plafond Gypsum 10cm 41.700 41.700

IV. PEKERJAAN BETON


1 Pek. Lantai Kerja t=10cm, K.100 1.296 1.296
2 Pek. Pondasi Footplat =1,00x3,40m', K.250 3.473 3.570
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR DPRD KABUPATEN LOM
LOKASI : JALAN LALU MUCHDAR NO. 1 SELONG
TAHUN ANGGARAN : 2016

VOLUME
NO. URAIAN PEKERJAAN
KONTRAK CCO
1 2 3 4

3 Pek. Sloof Beton =15x25cm, K.250 4.658 4.658


4 Pek. Kolom Beton Gerbang = 30x80cm', K.250 4.680 4.680
5 Pek. Kolom Beton Gerbang = 30x50cm', K.250 5.850 5.850
6 Pek. Kolom Beton Gerbang = 25x45cm', K.250 2.531 2.531
7 Pek. Kolom Beton K.1 = 15x25cm', K.250 1.418 1.418
8 Pek. Kolom Beton KP = 13x13cm', K.250 0.921 0.799
9 Pek. Balok Beton = 15x25cm, K.250 1.001 1.001
10 Pek. Balok Latei Beton = 13x15cm, K.250 0.328 0.328
11 Pek. Plat Dak Pos Jaga t=10cm, K.250 1.944 1.944
12 Pek. Plat Sunscreen t=7cm, K.250 0.652 0.657

V. PEKERJAAN STAINLESSTEEL DAN ALLUMINIUM


1 Pek. Pintu Gerbang Stainlessteel 39.000 39.000
2 Pek. Tiang Pipa Pintu Gerbang Stainlessteel dia.4" 30.000 30.000
3 Pek. Kusen Pintu Alluminium 4" 72.300 72.300
4 Pek. Daun Pintu Kaca Aluminium 4.800 4.800
5 Pek. Daun Pintu Aluminium KM/WC 4.200 4.200
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR DPRD KABUPATEN LOM
LOKASI : JALAN LALU MUCHDAR NO. 1 SELONG
TAHUN ANGGARAN : 2016

VOLUME
NO. URAIAN PEKERJAAN
KONTRAK CCO
1 2 3 4

6 Pek. Kaca Polos 5mm 13.440 13.440


7 Pek. Kunci Pintu 6.000 6.000
8 Pek. Engsel Pintu 18.000 18.000

VI. PEKERJAAN PENGECATAN


1 Pek. Cat Dinding Tembok 783.990 783.990

H. PEKERJAAN PAGAR SAMPING KANAN DAN BELAKANG


I. PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Pondasi Batu Kali 242.424 242.424
2 Pek. Urugan Kembali 242.424 206.451
3 Pek. Urugan Pasir Bawah Pondasi Batu Kali 30.303 30.303

II. PEKERJAAN PASANGAN DAN PLESTERAN


1 Pek. Batu Kosong 60.606 20.202
2 Pek. Pas. Pondasi Batu Kali, Camp.1PC:5PS 95.238 60.588
3 Pek. Pas. Dinding Bata 1/2Bt. Camp.1PC:5PS 432.900 144.300
4 Pek. Plesteran Dinding Bata, Camp.1PC:5PS 865.800 288.600
5 Pek. Plesteran Kolom Beton Dan Gapura, Camp.1PC:5PS 398.520 132.840
6 Pek. Acian 1,264.320 421.440

III. PEKERJAAN BETON


1 Pek. Sloof Beton =15x25cm, K.250 16.234 5.411
2 Pek. Kolom Beton K.2 = 20x40cm', K.250 28.044 9.348

IV. PEKERJAAN PAGAR STAINLESSTEEL


1 Pek. Pagar Stainlessteel dia.3" dan 4x4cm' 585.668 205.870

V. PEKERJAAN PENGECATAN
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR DPRD KABUPATEN LOM
LOKASI : JALAN LALU MUCHDAR NO. 1 SELONG
TAHUN ANGGARAN : 2016

VOLUME
NO. URAIAN PEKERJAAN
KONTRAK CCO
1 2 3 4

1 Pek. Cat Dinding Tembok 1,264.320 421.440

I. PEKERJAAN PAGAR SAMPING KIRI


I. PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Pondasi Batu Kali 185.388 65.296
2 Pek. Urugan Kembali 185.388 57.134
3 Pek. Urugan Pasir Bawah Pondasi Batu Kali 23.174 8.162

II. PEKERJAAN PASANGAN DAN PLESTERAN


1 Pek. Batu Kosong 46.347 16.324
2 Pek. Pas. Pondasi Batu Kali, Camp.1PC:5PS 72.831 46.640
3 Pek. Pas. Dinding Bata 1/2Bt. Camp.1PC:5PS 893.835 314.820
4 Pek. Plesteran Dinding Bata, Camp.1PC:5PS 1,787.670 629.640
5 Pek. Plesteran Kolom Beton Dan Gapura, Camp.1PC:5PS 398.520 103.680
6 Pek. Acian 2,186.190 733.320

III. PEKERJAAN BETON


1 Pek. Sloof Beton =15x25cm, K.250 12.414 4.373
2 Pek. Kolom Beton K.2 = 20x40cm', K.250 21.888 7.296
3 Pek. Ring Balok Beton = 13x15cm', K.250 6.455 2.274

IV. PEKERJAAN PENGECATAN


1 Pek. Cat Dinding Tembok 2,186.190 733.320

J. PEKERJAAN SARANA DAN PRASARANA LUAR


I. AREA JALAN DAN PARKIR LUAR BANGUNAN
1 Pek. Pemadatan tanah - sub grade CBR 5% tiap 20 cm 2,033.492 2,033.492
2 Pek. Urugan Tanah Klas C CBR 30% t=30 cm 610.048 610.048
3 Pek. Paving Block Press t=8 cm, K.200 2,033.492 2,033.492
4 Pekerjaan Kansteen 296.615 296.615
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR DPRD KABUPATEN LOM
LOKASI : JALAN LALU MUCHDAR NO. 1 SELONG
TAHUN ANGGARAN : 2016

VOLUME
NO. URAIAN PEKERJAAN
KONTRAK CCO
1 2 3 4

5 Rumput + tanah subur 548.000 284.870

II. PEKERJAAN DRAINASE


1 Galian tanah 127.680 127.680
2 Urug tanah kembali bekas galian 42.560 42.560
3 Buang tanah bekas galian area site 85.120 85.120
4 Urug pasir padat tebal 10 cm, 30.400 30.400
5 Beton Lantai Kerja tebal 5 cm 15.200 15.200
6 Gorong-gorong Pipa Beton Bertulang Dia. 50 cm 26.500 26.500
7 Pemasangan U Dicth tipe U-40 277.500 277.500
8 Tutup saluran - betob bertulang, U Dicth tipe U-40 277.500 277.500
9 Pekerjaan Pembuatan Bak Kontrol Uk. 60 x 60 Cm. 6.000 6.000
10 Pekerjaan Pembuatan Bak Kontrol Uk. 80 x 80 Cm. 4.000 4.000
ABUPATEN LOMBOK TIMUR

VOLUME JUM
SAT. KODE ANALISA HARGA SATUAN
SELISIH KONTRAK
5=4-3 6 5 7 8

Rp 6,244,977,975.12
Rp 45,756,456.10
- - Ls. Rp 10,000,000.00 Rp 10,000,000.00
- unit Ls. Rp 1,500,000.00 Rp 1,500,000.00
- m' A.6.4 Rp 64,513.10 Rp 14,838,013.00
- m' A.6.1 Rp 64,513.10 Rp 19,418,443.10

Rp 614,011,626.12
(80.28) m3 SNI 2835:08.6.3 Rp 72,756.00 Rp 226,601,836.02
2,345.19 m3 SNI 2835:08.6.1 Rp 49,500.00 Rp 54,821,250.00
17.10 m3 SNI 2835:08.6.1 Rp 49,500.00 Rp 7,078,500.00
(680.46) m3 SNI 2835:08.6.9 Rp 16,500.00 Rp 53,749,492.50
(1.83) m3 SNI 2835:08.6.11 Rp 157,800.00 Rp 14,042,148.60
0.95 m3 SNI 2835:08.6.11 Rp 157,800.00 Rp 2,256,540.00
- m3 SNI 2835:08.6.11 Rp 157,800.00 Rp 34,952,700.00
(664.50) m3 SNI 2835:08.6.15 Rp 144,300.00 Rp 95,887,350.00
- m3 SNI 2835:08.6.15 Rp 144,300.00 Rp 124,621,809.00

Rp 781,149,819.41
1.90 m3 SNI 2836:08.6.9 Rp 313,716.00 Rp 8,972,277.60
16.01 m3 SNI 2836:08.6.3 Rp 617,940.00 Rp 29,160,588.60
- m2 SNI 6897:08.6.2 Rp 224,050.00 Rp 174,787,006.25
(53.59) m2 SNI 6897:08.6.8 Rp 108,125.00 Rp 20,704,856.25
30.89 m2 SNI 6897:08.6.10 Rp 101,765.00 Rp 74,775,904.35
(107.18) m2 SNI 2837:08.6.14 Rp 67,233.00 Rp 130,649,182.59
ABUPATEN LOMBOK TIMUR

VOLUME JUM
SAT. KODE ANALISA HARGA SATUAN
SELISIH KONTRAK
5=4-3 6 5 7 8

61.79 m2 SNI 2837:08.6.16 Rp 62,589.00 Rp 91,979,542.62


111.60 m2 SNI 2837:08.6.16 Rp 62,589.00 Rp 32,446,137.60
(258.84) m2 SNI 2837:08.6.16 Rp 62,589.00 Rp 72,531,262.65
1,417.13 m2 SNI 2837:08.6.27 Rp 28,515.00 Rp 145,143,060.90

Rp 567,936,178.89
(5.76) m2 SNI 7395:08.6.13.a Rp 362,955.24 Rp 351,777,307.47
(73.23) m2 SNI 7395:08.6.13 Rp 362,955.24 Rp 152,622,678.42
- m2 SNI 7395:08.6.13 Rp 362,955.24 Rp 6,260,977.89
106.06 m' SNI 7395:08.6.28 Rp 51,092.67 Rp 17,192,683.46
(28.30) m2 SNI 7395:08.6.35 Rp 225,462.67 Rp 11,836,790.18
(1.60) m2 SNI 7395:08.6.36 Rp 229,185.50 Rp 2,062,669.50
9.18 m2 SNI 7395:08.6.54 Rp 251,446.00 Rp 26,183,071.98
35.94 m2 Ls. Rp 80,000.00 Rp -
35.94 m2 SNI 2839:08.6.1.a Rp 49,503.96 Rp -
24.00 m' SNI 2839:08.6.8 Rp 53,502.75 Rp -
Rp 3,887,413,736.57
(0.92) m3 SNI 7394:08.6.4 Rp 788,794.00 Rp 35,096,600.24
16.18 m3 SNI 7394:08.6.32.e Rp 2,115,873.63 Rp 475,119,423.62
6.34 m3 SNI 7394:08.6.28 Rp 2,568,193.71 Rp 200,904,657.55
4.31 m3 SNI 7394:08.6.28.a Rp 2,588,557.96 Rp 480,811,698.28
0.57 m3 SNI 7394:08.6.28.b Rp 2,689,073.28 Rp 34,957,952.64
0.11 m3 SNI 7394:08.6.28.b Rp 2,689,073.28 Rp 7,548,228.70
1.38 m3 SNI 7394:08.6.28.c Rp 2,674,834.99 Rp 17,260,710.19
0.30 m3 SNI 7394:08.6.28.d Rp 3,431,932.42 Rp 4,118,318.90
0.01 m3 SNI 7394:08.6.28.e Rp 2,309,939.86 Rp 1,256,607.28
(0.10) m3 SNI 7394:08.6.29 Rp 5,422,354.36 Rp 7,808,190.28
(3.88) m3 SNI 7394:08.6.29.a Rp 5,025,537.31 Rp 220,118,534.18
(0.00) m3 SNI 7394:08.6.29.b Rp 5,573,213.21 Rp 11,313,622.82
ABUPATEN LOMBOK TIMUR

VOLUME JUM
SAT. KODE ANALISA HARGA SATUAN
SELISIH KONTRAK
5=4-3 6 5 7 8

- m3 SNI 7394:08.6.30 Rp 4,664,471.59 Rp 283,786,451.54


- m3 SNI 7394:08.6.30.a Rp 4,664,471.59 Rp 8,731,890.82
- m3 SNI 7394:08.6.30.b Rp 4,341,748.71 Rp 16,255,507.17
- m3 SNI 7394:08.6.30.g Rp 7,908,829.69 Rp 14,805,329.18
- m3 SNI 7394:08.6.30.i Rp 9,142,668.88 Rp 6,418,153.55
- m3 SNI 7394:08.6.30 Rp 4,664,471.59 Rp 382,020,223.22
- m3 SNI 7394:08.6.30.a Rp 4,664,471.59 Rp 11,754,468.41
- m3 SNI 7394:08.6.30.b Rp 4,341,748.71 Rp 21,882,413.50
- m3 SNI 7394:08.6.30.g Rp 7,908,829.69 Rp 19,930,250.82
- m3 SNI 7394:08.6.30.i Rp 9,142,668.88 Rp 8,639,822.09
(0.83) m3 SNI 7394:08.6.30.l Rp 12,233,968.14 Rp 38,353,490.12
(0.16) m3 SNI 7394:08.6.30.m Rp 8,992,769.61 Rp 19,829,056.99
(0.23) m3 SNI 7394:08.6.31 Rp 6,527,018.22 Rp 22,028,686.49
(1.05) m3 SNI 7394:08.6.31.b Rp 6,640,963.43 Rp 118,043,124.97
(1.53) m3 SNI 7394:08.6.31.c Rp 6,253,695.97 Rp 97,088,629.93
(0.61) m3 SNI 7394:08.6.31.d Rp 6,060,062.24 Rp 82,719,849.58
(5.45) m3 SNI 7394:08.6.31.f Rp 6,476,812.20 Rp 100,066,748.49
(0.15) m3 SNI 7394:08.6.31.g Rp 6,244,451.73 Rp 9,366,677.60
0.10 m3 SNI 7394:08.6.31.h Rp 6,012,091.25 Rp 18,036,273.75
ABUPATEN LOMBOK TIMUR

VOLUME JUM
SAT. KODE ANALISA HARGA SATUAN
SELISIH KONTRAK
5=4-3 6 5 7 8

(0.11) m3 SNI 7394:08.6.31.k Rp 6,168,500.10 Rp 18,505,500.30


(0.45) m3 SNI 7394:08.6.31.l Rp 6,003,723.70 Rp 25,515,825.73
(0.08) m3 SNI 7394:08.6.31.m Rp 5,838,947.29 Rp 4,747,064.15
(0.08) m3 SNI 7394:08.6.31.n Rp 6,111,058.95 Rp 4,277,741.27
(0.82) m3 SNI 7394:08.6.31.o Rp 7,532,077.69 Rp 90,836,856.94
(0.81) m3 SNI 7394:08.6.31.p Rp 7,303,221.58 Rp 79,532,083.01
0.91 m3 SNI 7394:08.6.31.r Rp 7,633,656.24 Rp 4,274,847.49
(0.51) m3 SNI 7394:08.6.31.u Rp 8,203,178.82 Rp 7,202,391.00
(0.61) m3 SNI 7394:08.6.31.x Rp 8,416,546.80 Rp 40,399,424.64
(0.01) m3 SNI 7394:08.6.31.x Rp 8,416,546.80 Rp 2,844,792.82
(11.67) m3 SNI 7394:08.6.32 Rp 5,036,818.61 Rp 816,040,167.10
0.44 m3 SNI 7394:08.6.32.d Rp 6,739,304.25 Rp 11,766,825.22
(0.00) m3 SNI 7394:08.6.32.c Rp 6,799,274.61 Rp 5,398,624.04

Rp 31,149,295.80
(0.01) m3 SNI 3434:08.6.1 Rp 21,604,081.25 Rp 11,731,016.12
(0.06) m2 SNI 3434:08.6.5 Rp 600,725.00 Rp 16,339,720.00
(0.03) m2 SNI 3434:08.6.12 Rp 549,742.80 Rp 3,078,559.68

Rp 28,035,275.00
- bh Ls. Rp 500,000.00 Rp 5,000,000.00
- bh Ls. Rp 2,000.00 Rp 192,000.00
- bh SNI-02.17.6.2 Rp 312,630.00 Rp 5,002,080.00
- bh SNI-02.17.6.5 Rp 123,785.00 Rp 7,798,455.00
- bh SNI-02.17.6.10 Rp 140,870.00 Rp 1,408,700.00
- bh SNI-02.17.6.9 Rp 129,565.00 Rp 2,073,040.00
(0.99) m2 Ls. Rp 900,000.00 Rp 6,561,000.00
ABUPATEN LOMBOK TIMUR

VOLUME JUM
SAT. KODE ANALISA HARGA SATUAN
SELISIH KONTRAK
5=4-3 6 5 7 8

Rp 289,525,587.22
- m2 SNI-02.14.6.9 Rp 62,667.50 Rp 5,997,029.08
1,557.06 m2 SNI-02.14.6.14 Rp 55,702.40 Rp 283,528,558.14

Rp 5,577,159,678.87
Rp 561,910,110.06
(55.75) m2 SNI 6897:08.6.8 Rp 108,125.00 Rp 30,126,328.13
(104.18) m2 SNI 6897:08.6.10 Rp 101,765.00 Rp 118,857,958.23
(55.75) m2 SNI 2837:08.6.14 Rp 67,233.00 Rp 18,732,794.63
(208.36) m2 SNI 2837:08.6.16 Rp 62,589.00 Rp 146,203,522.77
- m2 SNI 2837:08.6.16 Rp 62,589.00 Rp 27,205,372.86
21.84 m2 SNI 2837:08.6.27 Rp 28,515.00 Rp 86,948,565.33
(0.00) m2 Ls. Rp 300,000.00 Rp 10,683,000.00
174.27 m2 Ls. Rp 300,000.00 Rp 36,339,600.00
- m2 SNI 7395:08.6.57 Rp 363,805.00 Rp 69,204,806.13
- m2 SNI 7395:08.6.57 Rp 363,805.00 Rp 17,608,162.00

Rp 991,683,870.87
(1.84) m2 SNI 7395:08.6.13.a Rp 362,955.24 Rp 103,423,369.73
(29.37) m2 SNI 7395:08.6.13 Rp 362,955.24 Rp 508,500,291.24
- m2 SNI 7395:08.6.13 Rp 362,955.24 Rp 39,977,704.91
38.02 m' SNI 7395:08.6.28 Rp 51,092.67 Rp 21,949,411.03
- m2 SNI 7395:08.6.35 Rp 225,462.67 Rp 8,708,495.63
- m2 SNI 7395:08.6.36 Rp 229,185.50 Rp 3,552,375.25
5.94 m2 SNI 7395:08.6.54 Rp 251,446.00 Rp 36,786,549.80
(132.45) m2 Ls. Rp 80,000.00 Rp 145,366,800.00
(132.45) m2 SNI 2839:08.6.1.a Rp 49,503.96 Rp 89,952,903.16
- m' SNI 2839:08.6.8 Rp 53,502.75 Rp 33,465,970.13
ABUPATEN LOMBOK TIMUR

VOLUME JUM
SAT. KODE ANALISA HARGA SATUAN
SELISIH KONTRAK
5=4-3 6 5 7 8

Rp 194,597,968.90
13.60 m' SNI 7393:08.6.12 Rp 208,528.10 Rp 104,716,555.98
1.92 m2 SNI 7393:08.6.13 Rp 402,282.50 Rp 9,268,588.80
10.10 m2 SNI 7393:08.6.13 Rp 402,282.50 Rp 67,364,618.32
- bh SNI-02.17.6.17 Rp 173,528.40 Rp 2,082,340.80
- bh SNI-02.17.6.5 Rp 123,785.00 Rp 4,456,260.00
- bh Ls. Rp 267,140.00 Rp 3,205,680.00
6.87 m2 Ls. Rp 75,000.00 Rp 3,503,925.00

Rp 580,699,375.00
50.67 m2 Ls. Rp 925,000.00 Rp 571,349,375.00
- bh Ls. Rp 1,400,000.00 Rp 1,400,000.00
- bh Ls. Rp 225,000.00 Rp 900,000.00
- bh Ls. Rp 150,000.00 Rp 7,050,000.00
ABUPATEN LOMBOK TIMUR

VOLUME JUM
SAT. KODE ANALISA HARGA SATUAN
SELISIH KONTRAK
5=4-3 6 5 7 8

Rp 2,631,195,941.33
(0.00) m3 SNI 7394:08.6.30.c Rp 5,442,918.78 Rp 301,880,604.30
1.57 m3 SNI 7394:08.6.30.g Rp 7,908,829.69 Rp 6,192,613.65
(0.00) m3 SNI 7394:08.6.30.h Rp 9,142,321.75 Rp 8,804,055.85
(0.00) m3 SNI 7394:08.6.30.i Rp 9,142,668.88 Rp 10,742,635.93
0.00 m3 SNI 7394:08.6.30.j Rp 5,939,512.08 Rp 81,145,614.04
3.42 m3 SNI 7394:08.6.30.k Rp 5,643,586.86 Rp 31,462,996.74
(0.22) m3 SNI 7394:08.6.30.l Rp 12,233,968.14 Rp 96,232,393.39
(0.23) m3 SNI 7394:08.6.31 Rp 6,527,018.22 Rp 22,028,686.49
(0.34) m3 SNI 7394:08.6.31.a Rp 6,217,204.25 Rp 29,724,453.52
(0.68) m3 SNI 7394:08.6.31.b Rp 6,640,963.43 Rp 119,537,341.74
(1.90) m3 SNI 7394:08.6.31.c Rp 6,253,695.97 Rp 109,564,753.39
(2.08) m3 SNI 7394:08.6.31.d Rp 6,060,062.24 Rp 71,678,416.17
(0.35) m3 SNI 7394:08.6.31.e Rp 6,709,172.68 Rp 26,420,722.01
(0.50) m3 SNI 7394:08.6.31.f Rp 6,476,812.20 Rp 34,003,264.05
(0.22) m3 SNI 7394:08.6.31.g Rp 6,244,451.73 Rp 22,248,981.51
(0.36) m3 SNI 7394:08.6.31.h Rp 6,012,091.25 Rp 10,749,619.16
(0.86) m3 SNI 7394:08.6.31.i Rp 6,077,762.83 Rp 50,141,543.35
(0.15) m3 SNI 7394:08.6.31.k Rp 6,168,500.10 Rp 50,507,678.82
(0.45) m3 SNI 7394:08.6.31.l Rp 6,003,723.70 Rp 76,175,246.31
(0.07) m3 SNI 7394:08.6.31.m Rp 5,838,947.29 Rp 4,379,210.47
(0.59) m3 SNI 7394:08.6.31.o Rp 7,532,077.69 Rp 151,372,165.34
(0.11) m3 SNI 7394:08.6.31.p Rp 7,303,221.58 Rp 54,883,710.17
(0.83) m3 SNI 7394:08.6.31.s Rp 7,376,193.11 Rp 25,964,199.75
0.07 m3 SNI 7394:08.6.31.u Rp 8,203,178.82 Rp 47,545,624.44
(0.43) m3 SNI 7394:08.6.31.x Rp 8,416,546.80 Rp 28,405,845.45
(0.00) m3 SNI 7394:08.6.31.x Rp 8,416,546.80 Rp 17,363,336.05
(0.02) m3 SNI 7394:08.6.31.x Rp 8,416,546.80 Rp 8,525,961.91
ABUPATEN LOMBOK TIMUR

VOLUME JUM
SAT. KODE ANALISA HARGA SATUAN
SELISIH KONTRAK
5=4-3 6 5 7 8

(15.06) m3 SNI 7394:08.6.32 Rp 5,036,818.61 Rp 1,048,816,739.16


1.34 m3 SNI 7394:08.6.32.d Rp 6,739,304.25 Rp 36,028,320.52
3.83 m3 SNI 7394:08.6.32.c Rp 6,799,274.61 Rp 6,547,701.45
2.05 m3 SNI 7394:08.6.32.c Rp 6,799,274.61 Rp 42,121,506.21

Rp 210,352,307.85
0.03 m3 SNI 3434:08.6.1 Rp 21,604,081.25 Rp 100,372,561.49
- m2 SNI 3434:08.6.6 Rp 441,675.00 Rp 22,048,416.00
3.84 m2 SNI 3434:08.6.5 Rp 600,725.00 Rp 1,153,392.00
1.40 m2 SNI 3434:08.6.12 Rp 549,742.80 Rp 5,387,479.44
- m2 SNI 3434:08.6.6 Rp 441,675.00 Rp 50,635,830.38
(0.00) m2 SNI 3434:08.6.7 Rp 706,325.00 Rp 3,448,984.98
- m2 SNI-02.17.6.17 Rp 173,528.40 Rp 5,643,143.57
- m' Ls. Rp 62,500.00 Rp 21,662,500.00

Rp 115,426,683.50
- m2 Ls. Rp 500,000.00 Rp 13,000,000.00
8.00 bh SNI-02.17.6.2 Rp 312,630.00 Rp 5,002,080.00
30.00 bh SNI-02.17.6.5 Rp 123,785.00 Rp 10,026,585.00
- bh SNI-02.17.6.6 Rp 73,625.00 Rp 25,179,750.00
1.00 bh SNI-02.17.6.9 Rp 129,565.00 Rp 4,664,340.00
(2.00) bh SNI-02.17.6.8 Rp 28,045.00 Rp 6,758,845.00
- bh SNI-02.17.6.10 Rp 140,870.00 Rp 3,662,620.00
- bh SNI-02.17.6.7 Rp 31,159.25 Rp 10,656,463.50
6.00 bh Ls. Rp 2,000.00 Rp 836,000.00
(9.90) m2 Ls. Rp 900,000.00 Rp 35,640,000.00

Rp 291,293,421.36
1.76 m2 SNI-02.14.6.9 Rp 62,667.50 Rp 20,228,442.33
ABUPATEN LOMBOK TIMUR

VOLUME JUM
SAT. KODE ANALISA HARGA SATUAN
SELISIH KONTRAK
5=4-3 6 5 7 8

21.84 m2 SNI-02.14.6.14 Rp 55,702.40 Rp 169,848,983.53


(132.45) m2 SNI-02.14.6.14 Rp 55,702.40 Rp 101,215,995.50

Rp 4,810,840,042.52
Rp 474,987,225.64
(20.22) m2 SNI 6897:08.6.8 Rp 108,125.00 Rp 25,098,515.63
43.69 m2 SNI 6897:08.6.10 Rp 101,765.00 Rp 139,066,960.75
(20.22) m2 SNI 2837:08.6.14 Rp 67,233.00 Rp 15,606,460.13
87.38 m2 SNI 2837:08.6.16 Rp 62,589.00 Rp 171,061,995.90
- m2 SNI 2837:08.6.16 Rp 62,589.00 Rp 27,205,372.86
249.54 m2 SNI 2837:08.6.27 Rp 28,515.00 Rp 96,947,920.38

Rp 963,494,274.16
- m2 SNI 7395:08.6.13 Rp 362,955.24 Rp 554,232,651.48
ABUPATEN LOMBOK TIMUR

VOLUME JUM
SAT. KODE ANALISA HARGA SATUAN
SELISIH KONTRAK
5=4-3 6 5 7 8

- m2 SNI 7395:08.6.13 Rp 362,955.24 Rp 39,977,704.91


- m' SNI 7395:08.6.28 Rp 51,092.67 Rp 41,083,615.95
- m2 SNI 7395:08.6.35 Rp 225,462.67 Rp 8,708,495.63
(0.23) m2 SNI 7395:08.6.36 Rp 229,185.50 Rp 2,148,614.06
2.09 m2 SNI 7395:08.6.54 Rp 251,446.00 Rp 31,732,485.20
(76.86) m2 Ls. Rp 80,000.00 Rp 144,214,000.00
(76.86) m2 SNI 2839:08.6.1.a Rp 49,503.96 Rp 89,239,551.09
- m' SNI 2839:08.6.8 Rp 53,502.75 Rp 52,157,155.84

Rp 2,658,244,727.94
(0.00) m3 SNI 7394:08.6.30.d Rp 5,210,558.30 Rp 288,993,194.99
(0.00) m3 SNI 7394:08.6.30.h Rp 9,142,321.75 Rp 4,973,423.03
(0.00) m3 SNI 7394:08.6.30.i Rp 9,142,668.88 Rp 10,742,635.93
(0.00) m3 SNI 7394:08.6.30.k Rp 5,643,586.86 Rp 67,469,080.91
(0.00) m3 SNI 7394:08.6.30.l Rp 12,233,968.14 Rp 93,540,920.40
(0.00) m3 SNI 7394:08.6.30.m Rp 8,992,769.61 Rp 3,525,165.69
0.75 m3 SNI 7394:08.6.31 Rp 6,527,018.22 Rp 22,028,686.49
0.47 m3 SNI 7394:08.6.31.a Rp 6,217,204.25 Rp 4,078,485.99
(1.34) m3 SNI 7394:08.6.31.b Rp 6,640,963.43 Rp 144,042,496.80
(0.30) m3 SNI 7394:08.6.31.c Rp 6,253,695.97 Rp 22,513,305.49
(4.13) m3 SNI 7394:08.6.31.d Rp 6,060,062.24 Rp 119,989,232.35
(0.13) m3 SNI 7394:08.6.31.f Rp 6,476,812.20 Rp 9,151,735.64
(0.06) m3 SNI 7394:08.6.31.g Rp 6,244,451.73 Rp 4,683,338.80
(1.78) m3 SNI 7394:08.6.31.k Rp 6,168,500.10 Rp 106,406,626.73
(0.33) m3 SNI 7394:08.6.31.l Rp 6,003,723.70 Rp 152,344,488.89
(0.07) m3 SNI 7394:08.6.31.m Rp 5,838,947.29 Rp 4,379,210.47
0.34 m3 SNI 7394:08.6.31.o Rp 7,532,077.69 Rp 78,295,947.59
(0.51) m3 SNI 7394:08.6.31.p Rp 7,303,221.58 Rp 116,340,319.77
(0.07) m3 SNI 7394:08.6.31.s Rp 7,376,193.11 Rp 32,455,249.68
ABUPATEN LOMBOK TIMUR

VOLUME JUM
SAT. KODE ANALISA HARGA SATUAN
SELISIH KONTRAK
5=4-3 6 5 7 8

1.01 m3 SNI 7394:08.6.31.u Rp 8,203,178.82 Rp 56,889,045.12


7.70 m3 SNI 7394:08.6.31.t Rp 6,862,743.60 Rp -
(5.79) m3 SNI 7394:08.6.31.w Rp 6,640,963.43 Rp 47,814,936.70
0.19 m3 SNI 7394:08.6.31.x Rp 8,416,546.80 Rp 4,056,775.56
(0.02) m3 SNI 7394:08.6.31.x Rp 8,416,546.80 Rp 8,525,961.91
8.81 m3 Rp 5,036,818.61 Rp -
(18.42) m3 SNI 7394:08.6.32 Rp 5,036,818.61 Rp 1,000,518,685.51
(6.08) m3 SNI 7394:08.6.32.a Rp 4,230,607.49 Rp 176,335,950.79
1.34 m3 SNI 7394:08.6.32.d Rp 6,739,304.25 Rp 36,028,320.52
2.05 m3 SNI 7394:08.6.32.c Rp 6,799,274.61 Rp 42,121,506.21

Rp 226,130,043.31
(0.08) m3 SNI 3434:08.6.1 Rp 21,604,081.25 Rp 105,643,957.31
- m2 SNI 3434:08.6.6 Rp 441,675.00 Rp 28,832,544.00
- m2 SNI 3434:08.6.5 Rp 600,725.00 Rp 3,460,176.00
- m2 SNI 3434:08.6.12 Rp 549,742.80 Rp 3,078,559.68
(2.80) m2 SNI 3434:08.6.6 Rp 441,675.00 Rp 59,520,123.00
37.44 m2 SNI-02.17.6.17 Rp 173,528.40 Rp 3,869,683.32
(36.35) m' Ls. Rp 62,500.00 Rp 21,725,000.00

Rp 176,487,801.50
- bh Ls. Rp 500,000.00 Rp 17,000,000.00
- bh SNI-02.17.6.2 Rp 312,630.00 Rp 7,503,120.00
- bh SNI-02.17.6.5 Rp 123,785.00 Rp 15,225,555.00
- bh SNI-02.17.6.6 Rp 73,625.00 Rp 29,302,750.00
- bh SNI-02.17.6.9 Rp 129,565.00 Rp 5,700,860.00
- bh SNI-02.17.6.8 Rp 28,045.00 Rp 7,824,555.00
- bh SNI-02.17.6.10 Rp 140,870.00 Rp 4,789,580.00
- bh SNI-02.17.6.7 Rp 31,159.25 Rp 12,401,381.50
ABUPATEN LOMBOK TIMUR

VOLUME JUM
SAT. KODE ANALISA HARGA SATUAN
SELISIH KONTRAK
5=4-3 6 5 7 8

4.00 bh Ls. Rp 2,000.00 Rp 924,000.00


(32.94) m2 Ls. Rp 900,000.00 Rp 75,816,000.00

Rp 311,495,969.96
- m2 SNI-02.14.6.9 Rp 62,667.50 Rp 21,700,501.90
249.54 m2 SNI-02.14.6.14 Rp 55,702.40 Rp 189,382,144.14
(76.86) m2 SNI-02.14.6.14 Rp 55,702.40 Rp 100,413,323.92

Rp 3,664,779,293.82
Rp 557,289,065.25
- m2 SNI 6897:08.6.8 Rp 108,125.00 Rp 25,098,515.63
- m2 SNI 6897:08.6.10 Rp 101,765.00 Rp 170,704,681.60
- m2 SNI 2837:08.6.14 Rp 67,233.00 Rp 15,606,460.13
- m2 SNI 2837:08.6.16 Rp 62,589.00 Rp 209,978,584.32
ABUPATEN LOMBOK TIMUR

VOLUME JUM
SAT. KODE ANALISA HARGA SATUAN
SELISIH KONTRAK
5=4-3 6 5 7 8

- m2 SNI 2837:08.6.16 Rp 62,589.00 Rp 23,095,341.00


187.84 m2 SNI 2837:08.6.27 Rp 28,515.00 Rp 112,805,482.58

Rp 955,993,090.97
- m2 SNI 7395:08.6.13 Rp 362,955.24 Rp 554,232,651.48
- m2 SNI 7395:08.6.13 Rp 362,955.24 Rp 39,977,704.91
- m' SNI 7395:08.6.28 Rp 51,092.67 Rp 32,196,046.00
- m2 SNI 7395:08.6.35 Rp 225,462.67 Rp 8,708,495.63
(0.50) m2 SNI 7395:08.6.36 Rp 229,185.50 Rp 3,982,785.62
2.09 m2 SNI 7395:08.6.54 Rp 251,446.00 Rp 31,732,485.20
(551.92) m2 Ls. Rp 80,000.00 Rp 149,014,000.00
(551.92) m2 SNI 2839:08.6.1.a Rp 49,503.96 Rp 92,209,788.69
- m' SNI 2839:08.6.8 Rp 53,502.75 Rp 43,939,133.44

Rp 1,485,354,884.61
- m3 SNI 7394:08.6.30.e Rp 6,675,303.76 Rp 236,946,582.26
0.25 m3 SNI 7394:08.6.30.h Rp 9,142,321.75 Rp 25,196,238.74
0.54 m3 SNI 7394:08.6.30.i Rp 9,142,668.88 Rp 10,742,635.93
(0.00) m3 SNI 7394:08.6.30.l Rp 12,233,968.14 Rp 169,085,673.66
0.18 m3 SNI 7394:08.6.30.m Rp 8,992,769.61 Rp 3,525,165.69
(0.06) m3 SNI 7394:08.6.31.c Rp 6,253,695.97 Rp 6,097,353.57
(0.30) m3 SNI 7394:08.6.31.d Rp 6,060,062.24 Rp 29,542,803.42
(0.15) m3 SNI 7394:08.6.31.f Rp 6,476,812.20 Rp 8,905,616.78
(0.06) m3 SNI 7394:08.6.31.i Rp 6,077,762.83 Rp 5,469,986.55
1.26 m3 SNI 7394:08.6.31.j Rp 5,803,135.48 Rp 36,559,753.52
0.07 m3 SNI 7394:08.6.31.k Rp 6,168,500.10 Rp 4,243,928.07
(0.50) m3 SNI 7394:08.6.31.l Rp 6,003,723.70 Rp 93,808,182.81
0.35 m3 SNI 7394:08.6.31.m Rp 5,838,947.29 Rp 62,768,683.37
(0.04) m3 SNI 7394:08.6.31.o Rp 7,532,077.70 Rp 4,406,265.45
ABUPATEN LOMBOK TIMUR

VOLUME JUM
SAT. KODE ANALISA HARGA SATUAN
SELISIH KONTRAK
5=4-3 6 5 7 8

(0.17) m3 SNI 7394:08.6.31.p Rp 7,303,221.58 Rp 17,418,183.47


(0.14) m3 SNI 7394:08.6.31.q Rp 7,376,193.11 Rp 15,932,577.12
(0.20) m3 SNI 7394:08.6.31.s Rp 7,376,193.11 Rp 101,791,464.92
(4.28) m3 SNI 7394:08.6.31.t Rp 6,862,743.60 Rp 34,828,423.77
(1.00) m3 SNI 7394:08.6.31.u Rp 8,203,178.82 Rp 16,242,294.06
(0.01) m3 SNI 7394:08.6.31.x Rp 8,416,546.80 Rp 6,312,410.10
(5.17) m3 SNI 7394:08.6.32 Rp 5,036,818.61 Rp 130,554,338.37
(2.94) m3 SNI 7394:08.6.32.b Rp 5,280,679.00 Rp 401,278,797.21
0.45 m3 SNI 7394:08.6.32.d Rp 6,739,304.25 Rp 12,009,440.17
(0.29) m3 SNI 7394:08.6.32.c Rp 6,799,274.61 Rp 51,688,085.59

Rp 188,523,993.69
0.57 m3 SNI 3434:08.6.1 Rp 21,604,081.25 Rp 93,480,859.57
- m2 SNI 3434:08.6.6 Rp 441,675.00 Rp 32,224,608.00
3.81 m2 SNI 3434:08.6.5 Rp 600,725.00 Rp 2,306,784.00
- m2 SNI 3434:08.6.12 Rp 549,742.80 Rp 6,157,119.36
0.36 m2 SNI 3434:08.6.6 Rp 441,675.00 Rp 31,146,921.00
17.98 m2 SNI-02.17.6.17 Rp 173,528.40 Rp 10,795,201.76
(47.40) m' Ls. Rp 62,500.00 Rp 12,412,500.00

Rp 117,525,680.00
(4.00) bh Ls. Rp 500,000.00 Rp 21,000,000.00
2.00 bh SNI-02.17.6.2 Rp 312,630.00 Rp 9,066,270.00
6.00 bh SNI-02.17.6.5 Rp 123,785.00 Rp 17,825,040.00
4.00 bh SNI-02.17.6.6 Rp 73,625.00 Rp 16,492,000.00
(8.00) bh SNI-02.17.6.9 Rp 129,565.00 Rp 7,514,770.00
78.00 bh SNI-02.17.6.8 Rp 28,045.00 Rp 1,121,800.00
- bh SNI-02.17.6.10 Rp 140,870.00 Rp 5,353,060.00
148.00 bh SNI-02.17.6.7 Rp 31,159.25 Rp 2,492,740.00
ABUPATEN LOMBOK TIMUR

VOLUME JUM
SAT. KODE ANALISA HARGA SATUAN
SELISIH KONTRAK
5=4-3 6 5 7 8

16.00 bh Ls. Rp 2,000.00 Rp 1,020,000.00


- m2 Ls. Rp 900,000.00 Rp 35,640,000.00

Rp 360,092,579.31
5.69 m2 A.4.7.1.5 Rp 65,134.00 Rp 21,572,250.53
187.84 m2 A.4.7.1.10 Rp 58,178.20 Rp 230,153,250.09
(551.92) m2 A.4.7.1.10 Rp 58,178.20 Rp 108,367,078.69

Rp 2,587,842,475.10
Rp 161,255,496.72
(1.30) m2 SNI 6897:08.6.10 Rp 101,765.00 Rp 54,000,579.60
(2.60) m2 SNI 2837:08.6.16 Rp 62,589.00 Rp 66,424,453.92
ABUPATEN LOMBOK TIMUR

VOLUME JUM
SAT. KODE ANALISA HARGA SATUAN
SELISIH KONTRAK
5=4-3 6 5 7 8

- m2 SNI 2837:08.6.16 Rp 62,589.00 Rp 7,260,324.00


294.36 m2 SNI 2837:08.6.27 Rp 28,515.00 Rp 33,570,139.20

Rp 89,881,339.75
(5.03) m2 SNI 7395:08.6.13 Rp 362,955.24 Rp 76,982,806.40
(0.00) m2 SNI 7395:08.6.13 Rp 362,955.24 Rp 9,672,031.24
45.81 m' SNI 7395:08.6.28 Rp 51,092.67 Rp 3,226,502.11

Rp 219,239,500.76
- m3 SNI 7394:08.6.30.f Rp 6,041,703.07 Rp 61,867,039.44
0.25 m3 SNI 7394:08.6.30.h Rp 9,142,321.75 Rp 2,285,580.44
- m3 SNI 7394:08.6.30.i Rp 9,142,668.88 Rp 4,937,041.20
(0.18) m3 SNI 7394:08.6.30.m Rp 8,992,769.61 Rp 1,618,698.53
(25.44) m3 SNI 7394:08.6.31.v Rp 5,838,947.29 Rp 148,531,141.16

Rp 10,964,603.29
0.16 m3 SNI 3434:08.6.1 Rp 21,604,081.25 Rp 1,274,640.79
(1.92) m2 SNI 3434:08.6.5 Rp 600,725.00 Rp 3,460,176.00
(4.62) m2 SNI 3434:08.6.7 Rp 706,325.00 Rp 6,229,786.50

Rp 37,504,990.50
1.00 bh SNI-02.17.6.2 Rp 312,630.00 Rp 937,890.00
6.00 bh SNI-02.17.6.5 Rp 123,785.00 Rp 1,114,065.00
4.00 bh SNI-02.17.6.6 Rp 73,625.00 Rp 441,750.00
1.00 bh SNI-02.17.6.9 Rp 129,565.00 Rp 388,695.00
2.00 bh SNI-02.17.6.8 Rp 28,045.00 Rp 84,135.00
4.00 bh SNI-02.17.6.7 Rp 31,159.25 Rp 186,955.50
8.00 bh Ls. Rp 2,000.00 Rp 48,000.00
0.02 m2 Ls. Rp 900,000.00 Rp 34,303,500.00
ABUPATEN LOMBOK TIMUR

VOLUME JUM
SAT. KODE ANALISA HARGA SATUAN
SELISIH KONTRAK
5=4-3 6 5 7 8

Rp 2,002,523,578.69
(318.84) kg SNI 7393:08.6.2 Rp 26,405.20 Rp 65,400,399.36
2,045.45 kg SNI 7393:08.6.2 Rp 26,405.20 Rp 493,882,860.80
255.78 kg SNI 7393:08.6.2 Rp 26,405.20 Rp 46,050,668.80
198.58 kg SNI 7393:08.6.2 Rp 26,405.20 Rp 35,699,830.40
16.64 kg SNI 7393:08.6.1 Rp 26,405.20 Rp 471,445,675.82
418.09 kg SNI 7393:08.6.1 Rp 26,405.20 Rp 9,234,954.65
(11.32) kg SNI 7393:08.6.1 Rp 26,405.20 Rp 12,851,173.19
0.00 kg SNI 7393:08.6.1 Rp 26,405.20 Rp 34,886,127.76
(0.00) kg SNI 7393:08.6.1 Rp 26,405.20 Rp 1,499,313.66
20.86 m' Ls. 18,948.150 Rp 16,721,742.38
- m' Ls. 11,217.305 Rp 6,079,779.31
(6.00) bh Ls. Rp 25,000.00 Rp 6,450,000.00
39.00 bh Ls. Rp 6,500.00 Rp 11,368,500.00
(86.30) /10cm' SNI 7393:08.6.5 Rp 2,344.77 Rp 11,240,592.90
26.61 /100kg SNI 7393:08.6.3 Rp 33,812.20 Rp 14,974,983.82
337.58 m2 Ls. Rp 120,000.00 Rp 273,612,000.00
337.58 m2 SNI-02.8.6.30 Rp 200,967.15 Rp 458,225,198.72
- m' SNI-02.8.6.34 Rp 106,032.75 Rp 16,276,027.13
0.75 m' Ls. Rp 82,500.00 Rp 16,623,750.00

Rp 66,472,965.38
(5.655) m2 SNI-02.14.6.9 Rp 62,667.50 Rp 895,643.91
294.355 m2 SNI-02.14.6.14 Rp 55,702.40 Rp 65,577,321.47

Rp 196,166,450.63
Rp 3,060,417.60
- m3 SNI 2835:08.6.2 Rp 61,020.00 Rp 781,056.00
ABUPATEN LOMBOK TIMUR

VOLUME JUM
SAT. KODE ANALISA HARGA SATUAN
SELISIH KONTRAK
5=4-3 6 5 7 8

- m3 SNI 2835:08.6.1 Rp 49,500.00 Rp 1,121,274.00


- m3 SNI 2835:08.6.9 Rp 16,500.00 Rp 584,958.00
- m3 SNI 2835:08.6.11 Rp 157,800.00 Rp 126,240.00
(0.00) m3 SNI 2835:08.6.11 Rp 157,800.00 Rp 446,889.60
ABUPATEN LOMBOK TIMUR

VOLUME JUM
SAT. KODE ANALISA HARGA SATUAN
SELISIH KONTRAK
5=4-3 6 5 7 8

Rp 43,213,634.21
- m3 SNI 2836:08.6.9 Rp 313,716.00 Rp 1,776,573.71
- m3 SNI 2836:08.6.3 Rp 617,940.00 Rp 5,499,048.06
(0.00) m2 SNI 6897:08.6.10 Rp 101,765.00 Rp 9,752,445.25
- m2 SNI 2837:08.6.16 Rp 62,589.00 Rp 11,996,120.69
- m2 SNI 2837:08.6.16 Rp 62,589.00 Rp 5,993,522.64
- m2 SNI 2837:08.6.27 Rp 28,515.00 Rp 8,195,923.88

Rp 102,596,948.01
- m3 SNI 7394:08.6.4 Rp 788,794.00 Rp 631,035.20
0.79 m3 SNI 7394:08.6.28.d Rp 3,431,932.42 Rp 8,274,389.06
(0.00) m3 SNI 7394:08.6.29.b Rp 5,573,213.21 Rp 8,454,564.44
- m3 SNI 7394:08.6.30.m Rp 8,992,769.61 Rp 12,814,696.69
- m3 SNI 7394:08.6.30.i Rp 9,142,668.88 Rp 8,338,114.02
- m3 SNI 7394:08.6.30.m Rp 8,992,769.61 Rp 6,609,685.66
0.00 m3 SNI 7394:08.6.30.l Rp 12,233,968.14 Rp 4,697,843.77
- m3 SNI 7394:08.6.30.l Rp 12,233,968.14 Rp 4,294,122.82
(0.80) m3 SNI 7394:08.6.31.x Rp 8,416,546.80 Rp 19,517,972.03
(0.65) m3 SNI 7394:08.6.32.b Rp 5,280,679.00 Rp 28,964,524.32

Rp 31,285,188.49
- m2 SNI 7395:08.6.13 Rp 362,955.24 Rp 5,081,373.36
- m2 SNI 7395:08.6.57 Rp 363,805.00 Rp 1,464,315.13
- bh Ls. Rp 1,400,000.00 Rp 1,400,000.00
- bh Ls. Rp 150,000.00 Rp 7,050,000.00
- bh Ls. Rp 200,000.00 Rp 800,000.00
1.75 m2 Ls. Rp 1,300,000.00 Rp 15,489,500.00

Rp 16,010,262.32
ABUPATEN LOMBOK TIMUR

VOLUME JUM
SAT. KODE ANALISA HARGA SATUAN
SELISIH KONTRAK
5=4-3 6 5 7 8

- m2 SNI-02.14.6.14 Rp 55,702.40 Rp 16,010,262.32

Rp 483,346,503.29
Rp 6,953,406.12
- m3 SNI 2835:08.6.2 Rp 61,020.00 Rp 1,265,310.72
- m3 SNI 2835:08.6.1 Rp 49,500.00 Rp 2,968,812.00
(12.36) m3 SNI 2835:08.6.9 Rp 16,500.00 Rp 1,331,748.00
- m3 SNI 2835:08.6.11 Rp 157,800.00 Rp 204,508.80
- m3 SNI 2835:08.6.11 Rp 157,800.00 Rp 1,183,026.60

Rp 122,497,070.99
- m3 SNI 2836:08.6.9 Rp 313,716.00 Rp 4,703,857.70
- m3 SNI 2836:08.6.3 Rp 617,940.00 Rp 14,559,902.28
- m2 SNI 6897:08.6.10 Rp 101,765.00 Rp 31,808,686.05
- m2 SNI 2837:08.6.16 Rp 62,589.00 Rp 39,126,887.46
- m2 SNI 2837:08.6.16 Rp 62,589.00 Rp 9,942,262.65
- m2 SNI 2837:08.6.27 Rp 28,515.00 Rp 22,355,474.85

Rp 12,826,040.02
- m2 SNI 7395:08.6.35 Rp 225,462.67 Rp 2,637,913.24
- m2 SNI 7395:08.6.36 Rp 229,185.50 Rp 1,031,334.75
- m2 SNI 7395:08.6.54 Rp 251,446.00 Rp 4,827,763.20
- m2 Ls. Rp 80,000.00 Rp 1,296,000.00
- m2 SNI 2839:08.6.1.a Rp 49,503.96 Rp 801,964.15
- m' SNI 2839:08.6.8 Rp 53,502.75 Rp 2,231,064.68

Rp 208,957,426.99
- m3 SNI 7394:08.6.4 Rp 788,794.00 Rp 1,022,277.02
0.10 m3 SNI 7394:08.6.28.d Rp 3,431,932.42 Rp 11,919,101.29
ABUPATEN LOMBOK TIMUR

VOLUME JUM
SAT. KODE ANALISA HARGA SATUAN
SELISIH KONTRAK
5=4-3 6 5 7 8

(0.00) m3 SNI 7394:08.6.29.b Rp 5,573,213.21 Rp 25,960,027.13


- m3 SNI 7394:08.6.30.i Rp 9,142,668.88 Rp 42,787,690.36
- m3 SNI 7394:08.6.30.i Rp 9,142,668.88 Rp 53,484,612.95
0.00 m3 SNI 7394:08.6.30.i Rp 9,142,668.88 Rp 23,140,094.94
(0.00) m3 SNI 7394:08.6.30.m Rp 8,992,769.61 Rp 12,751,747.31
(0.12) m3 SNI 7394:08.6.30.l Rp 12,233,968.14 Rp 11,267,484.66
0.00 m3 SNI 7394:08.6.31.x Rp 8,416,546.80 Rp 8,424,963.35
(0.00) m3 SNI 7394:08.6.31.y Rp 10,672,746.85 Rp 3,500,660.97
- m3 SNI 7394:08.6.32.b Rp 5,280,679.00 Rp 10,265,639.98
0.00 m3 SNI 7394:08.6.32.c Rp 6,799,274.61 Rp 4,433,127.05

Rp 88,442,434.59
- m2 Ls. Rp 1,300,000.00 Rp 50,700,000.00
- m' Ls. Rp 325,000.00 Rp 9,750,000.00
- m' SNI 7393:08.6.12 Rp 208,528.10 Rp 15,076,581.63
- m2 SNI 7393:08.6.13 Rp 402,282.50 Rp 1,930,956.00
- m2 SNI 3434:08.6.12 Rp 549,742.80 Rp 2,308,919.76
ABUPATEN LOMBOK TIMUR

VOLUME JUM
SAT. KODE ANALISA HARGA SATUAN
SELISIH KONTRAK
5=4-3 6 5 7 8

- m2 SNI 7393:08.6.13 Rp 402,282.50 Rp 5,406,676.80


- bh SNI-02.17.6.17 Rp 173,528.40 Rp 1,041,170.40
- bh SNI-02.17.6.5 Rp 123,785.00 Rp 2,228,130.00

Rp 43,670,124.58
- m2 SNI-02.14.6.14 Rp 55,702.40 Rp 43,670,124.58

Rp 1,436,551,524.49
Rp 20,781,797.40
- m3 SNI 2835:08.6.1 Rp 49,500.00 Rp 11,999,988.00
(35.97) m3 SNI 2835:08.6.9 Rp 16,500.00 Rp 3,999,996.00
- m3 SNI 2835:08.6.11 Rp 157,800.00 Rp 4,781,813.40

Rp 237,103,119.40
(40.40) m3 SNI 2836:08.6.9 Rp 313,716.00 Rp 19,013,071.90
(34.65) m3 SNI 2836:08.6.3 Rp 617,940.00 Rp 58,851,369.72
(288.60) m2 SNI 6897:08.6.10 Rp 101,765.00 Rp 44,054,068.50
(577.20) m2 SNI 2837:08.6.16 Rp 62,589.00 Rp 54,189,556.20
(265.68) m2 SNI 2837:08.6.16 Rp 62,589.00 Rp 24,942,968.28
(842.88) m2 SNI 2837:08.6.27 Rp 28,515.00 Rp 36,052,084.80

Rp 346,872,549.32
(10.82) m3 SNI 7394:08.6.29.b Rp 5,573,213.21 Rp 90,475,543.25
(18.70) m3 SNI 7394:08.6.30.i Rp 9,142,668.88 Rp 256,397,006.07

Rp 761,368,400.00
(379.80) m2 Ls. Rp 1,300,000.00 Rp 761,368,400.00

Rp 70,425,658.37
ABUPATEN LOMBOK TIMUR

VOLUME JUM
SAT. KODE ANALISA HARGA SATUAN
SELISIH KONTRAK
5=4-3 6 5 7 8

(842.88) m2 SNI-02.14.6.14 Rp 55,702.40 Rp 70,425,658.37

Rp 825,538,437.33
Rp 15,892,465.20
(120.09) m3 SNI 2835:08.6.1 Rp 49,500.00 Rp 9,176,706.00
(128.25) m3 SNI 2835:08.6.9 Rp 16,500.00 Rp 3,058,902.00
(15.01) m3 SNI 2835:08.6.11 Rp 157,800.00 Rp 3,656,857.20

Rp 349,676,756.13
(30.02) m3 SNI 2836:08.6.9 Rp 313,716.00 Rp 14,539,795.45
(26.19) m3 SNI 2836:08.6.3 Rp 617,940.00 Rp 45,005,188.14
(579.02) m2 SNI 6897:08.6.10 Rp 101,765.00 Rp 90,961,118.78
(1,158.03) m2 SNI 2837:08.6.16 Rp 62,589.00 Rp 111,888,477.63
(294.84) m2 SNI 2837:08.6.16 Rp 62,589.00 Rp 24,942,968.28
(1,452.87) m2 SNI 2837:08.6.27 Rp 28,515.00 Rp 62,339,207.85

Rp 338,193,186.15
(8.04) m3 SNI 7394:08.6.29.b Rp 5,573,213.21 Rp 69,185,868.79
(14.59) m3 SNI 7394:08.6.30.i Rp 9,142,668.88 Rp 200,114,736.45
(4.18) m3 SNI 7394:08.6.31.y Rp 10,672,746.85 Rp 68,892,580.92

Rp 121,776,029.86
(1,452.87) m2 SNI-02.14.6.14 Rp 55,702.40 Rp 121,776,029.86

Rp 886,193,426.83
Rp 571,577,778.03
- m2 SNI 2835:08.6.10 Rp 36,600.00 Rp 74,425,807.20
- m3 SNI 2835:08.6.15 Rp 144,300.00 Rp 88,029,926.40
- m2 SNI 6897:08.6.11 Rp 168,977.50 Rp 343,614,394.43
- m' Ls. Rp 110,000.00 Rp 32,627,650.00
ABUPATEN LOMBOK TIMUR

VOLUME JUM
SAT. KODE ANALISA HARGA SATUAN
SELISIH KONTRAK
5=4-3 6 5 7 8

(263.13) m2 Ls. Rp 60,000.00 Rp 32,880,000.00

Rp 314,615,648.80
- m3 SNI 2835:08.6.1 Rp 49,500.00 Rp 6,320,160.00
- m3 SNI 2835:08.6.9 Rp 16,500.00 Rp 702,240.00
- m3 Ls. Rp 20,500.00 Rp 1,744,960.00
- m3 SNI 2835:08.6.11 Rp 157,800.00 Rp 4,797,120.00
- m3 SNI 7394:08.6.4 Rp 788,794.00 Rp 11,989,668.80
- m' Ls. Rp 221,000.00 Rp 5,856,500.00
- m' Ls. Rp 174,000.00 Rp 48,285,000.00
- m' Ls. Rp 828,000.00 Rp 229,770,000.00
- bh Ls. Rp 425,000.00 Rp 2,550,000.00
- bh Ls. Rp 650,000.00 Rp 2,600,000.00
JUMLAH HARGA

CCO SELISIH
9 10 = 9 - 8

Rp 6,252,267,524.86 Rp 7,289,549.74
Rp 45,756,456.10 Rp -
Rp 10,000,000.00 Rp -
Rp 1,500,000.00 Rp -
Rp 14,838,013.00 Rp -
Rp 19,418,443.10 Rp -
###
Rp 617,849,697.41 Rp 3,838,071.29
Rp 220,761,275.36 Rp (5,840,560.66)
Rp 170,908,107.98 Rp 116,086,857.98
Rp 7,924,888.13 Rp 846,388.13
Rp 42,521,960.25 Rp (11,227,532.25)
Rp 13,752,901.20 Rp (289,247.40)
Rp 2,406,055.50 Rp 149,515.50
Rp 34,952,700.00 Rp -
Rp - Rp (95,887,350.00)
Rp 124,621,809.00 Rp -
###
Rp 816,840,445.09 Rp 35,690,625.68
Rp 9,566,769.42 Rp 594,491.82
Rp 39,051,876.94 Rp 9,891,288.34
Rp 174,787,006.25 Rp -
Rp 14,910,437.50 Rp (5,794,418.75)
Rp 77,919,832.26 Rp 3,143,927.91
Rp 123,443,149.65 Rp (7,206,032.94)
JUMLAH HARGA

CCO SELISIH
9 10 = 9 - 8

Rp 95,846,791.75 Rp 3,867,249.13
Rp 39,431,070.00 Rp 6,984,932.40
Rp 56,330,869.84 Rp (16,200,392.81)
Rp 185,552,641.48 Rp 40,409,580.58
###
Rp 546,183,631.35 Rp (21,752,547.55)
Rp 349,686,503.81 Rp (2,090,803.66)
Rp 126,044,409.88 Rp (26,578,268.54)
Rp 6,260,977.89 Rp -
Rp 22,611,469.85 Rp 5,418,786.39
Rp 5,455,294.76 Rp (6,381,495.41)
Rp 1,695,514.33 Rp (367,155.17)
Rp 28,491,346.26 Rp 2,308,274.28
Rp 2,875,000.00 Rp 2,875,000.00
Rp 1,779,048.56 Rp 1,779,048.56
Rp 1,284,066.00 Rp 1,284,066.00
Rp 3,791,351,367.96 Rp (96,062,368.62)
Rp 34,373,276.14 Rp (723,324.10)
Rp 509,350,450.38 Rp 34,231,026.76
Rp 217,176,732.89 Rp 16,272,075.35
Rp 491,955,440.30 Rp 11,143,742.02
Rp 36,504,169.78 Rp 1,546,217.14
Rp 7,852,093.98 Rp 303,865.28
Rp 20,964,019.23 Rp 3,703,309.04
Rp 5,147,898.63 Rp 1,029,579.73
Rp 1,270,466.92 Rp 13,859.64
Rp 7,287,644.26 Rp (520,546.02)
Rp 200,615,428.99 Rp (19,503,105.19)
Rp 11,310,836.21 Rp (2,786.61)
JUMLAH HARGA

CCO SELISIH
9 10 = 9 - 8

Rp 283,786,451.54 Rp -
Rp 8,731,890.82 Rp -
Rp 16,255,507.17 Rp -
Rp 14,805,329.18 Rp -
Rp 6,418,153.55 Rp -
Rp 382,020,223.22 Rp -
Rp 11,754,468.41 Rp -
Rp 21,882,413.50 Rp -
Rp 19,930,250.82 Rp -
Rp 8,639,822.09 Rp -
Rp 28,221,929.40 Rp (10,131,560.72)
Rp 18,412,695.78 Rp (1,416,361.21)
Rp 20,560,107.39 Rp (1,468,579.10)
Rp 111,070,113.37 Rp (6,973,011.60)
Rp 87,520,475.10 Rp (9,568,154.83)
Rp 78,992,911.30 Rp (3,726,938.28)
Rp 64,768,122.00 Rp (35,298,626.49)
Rp 8,430,009.84 Rp (936,667.76)
Rp 18,660,028.22 Rp 623,754.47
JUMLAH HARGA

CCO SELISIH
9 10 = 9 - 8

Rp 17,811,544.04 Rp (693,956.26)
Rp 22,814,150.06 Rp (2,701,675.67)
Rp 4,306,223.63 Rp (440,840.52)
Rp 3,788,856.55 Rp (488,884.72)
Rp 84,668,085.31 Rp (6,168,771.63)
Rp 73,636,192.22 Rp (5,895,890.78)
Rp 11,236,741.99 Rp 6,961,894.49
Rp 3,052,813.00 Rp (4,149,578.01)
Rp 35,264,279.02 Rp (5,135,145.62)
Rp 2,745,898.39 Rp (98,894.42)
Rp 757,251,427.65 Rp (58,788,739.45)
Rp 14,708,531.53 Rp 2,941,706.31
Rp 5,397,264.19 Rp (1,359.85)
###
###
Rp 30,884,221.59 Rp (265,074.21)
Rp 11,514,975.31 Rp (216,040.81)
Rp 16,306,079.40 Rp (33,640.60)
Rp 3,063,166.88 Rp (15,392.80)
###
Rp 27,144,275.00 Rp (891,000.00)
Rp 5,000,000.00 Rp -
Rp 192,000.00 Rp -
Rp 5,002,080.00 Rp -
Rp 7,798,455.00 Rp -
Rp 1,408,700.00 Rp -
Rp 2,073,040.00 Rp -
Rp 5,670,000.00 Rp (891,000.00)
###
JUMLAH HARGA

CCO SELISIH
9 10 = 9 - 8

Rp 376,257,430.36 Rp 86,731,843.14
Rp 5,997,029.08 Rp -
Rp 370,260,401.28 Rp 86,731,843.14
###
Rp 5,558,204,889.73 Rp (18,954,789.14)
Rp 581,394,558.67 Rp 19,484,448.61
Rp 24,098,521.56 Rp (6,027,806.56)
Rp 108,256,029.64 Rp (10,601,928.58)
Rp 14,984,655.72 Rp (3,748,138.90)
Rp 133,162,416.14 Rp (13,041,106.63)
Rp 27,205,372.86 Rp -
Rp 87,571,204.61 Rp 622,639.28
Rp 10,682,910.00 Rp (90.00)
Rp 88,620,480.00 Rp 52,280,880.00
Rp 69,204,806.13 Rp -
Rp 17,608,162.00 Rp -
###
Rp 966,638,732.35 Rp (25,045,138.52)
Rp 102,754,443.22 Rp (668,926.51)
Rp 497,840,295.84 Rp (10,659,995.40)
Rp 39,977,704.91 Rp -
Rp 23,891,852.16 Rp 1,942,441.13
Rp 8,708,495.63 Rp -
Rp 3,552,375.25 Rp -
Rp 38,281,144.82 Rp 1,494,595.02
Rp 134,770,520.00 Rp (10,596,280.00)
Rp 83,395,930.39 Rp (6,556,972.77)
Rp 33,465,970.13 Rp -
###
JUMLAH HARGA

CCO SELISIH
9 10 = 9 - 8

Rp 202,783,526.69 Rp 8,185,557.79
Rp 107,552,538.14 Rp 2,835,982.16
Rp 10,040,971.20 Rp 772,382.40
Rp 71,426,786.55 Rp 4,062,168.23
Rp 2,082,340.80 Rp -
Rp 4,456,260.00 Rp -
Rp 3,205,680.00 Rp -
Rp 4,018,950.00 Rp 515,025.00
###
Rp 627,573,703.75 Rp 46,874,328.75
Rp 618,223,703.75 Rp 46,874,328.75
Rp 1,400,000.00 Rp -
Rp 900,000.00 Rp -
Rp 7,050,000.00 Rp -
JUMLAH HARGA

CCO SELISIH
9 10 = 9 - 8

###
Rp 2,567,641,572.94 Rp (63,554,368.39)
Rp 301,877,882.84 Rp (2,721.46)
Rp 18,577,840.94 Rp 12,385,227.29
Rp 8,799,484.68 Rp (4,571.16)
Rp 10,738,064.60 Rp (4,571.33)
Rp 81,168,944.70 Rp 23,330.66
Rp 50,751,698.54 Rp 19,288,701.80
Rp 93,535,537.45 Rp (2,696,855.94)
Rp 20,560,107.39 Rp (1,468,579.10)
Rp 27,581,072.35 Rp (2,143,381.17)
Rp 115,054,691.42 Rp (4,482,650.32)
Rp 97,707,745.84 Rp (11,857,007.56)
Rp 59,085,606.84 Rp (12,592,809.33)
Rp 24,069,156.99 Rp (2,351,565.02)
Rp 30,764,857.95 Rp (3,238,406.10)
Rp 20,887,691.04 Rp (1,361,290.48)
Rp 8,612,320.72 Rp (2,137,298.44)
Rp 44,945,056.13 Rp (5,196,487.22)
Rp 49,563,898.30 Rp (943,780.52)
Rp 73,470,568.78 Rp (2,704,677.53)
Rp 3,941,289.42 Rp (437,921.05)
Rp 146,904,890.06 Rp (4,467,275.28)
Rp 54,048,951.95 Rp (834,758.23)
Rp 19,827,207.08 Rp (6,136,992.67)
Rp 48,080,881.86 Rp 535,257.42
Rp 24,747,803.80 Rp (3,658,041.65)
Rp 17,359,127.78 Rp (4,208.27)
Rp 8,332,381.33 Rp (193,580.58)
JUMLAH HARGA

CCO SELISIH
9 10 = 9 - 8

Rp 972,970,628.29 Rp (75,846,110.87)
Rp 45,035,400.65 Rp 9,007,080.13
Rp 32,554,926.83 Rp 26,007,225.38
Rp 56,085,856.40 Rp 13,964,350.19
###
Rp 214,113,768.08 Rp 3,761,460.24
Rp 101,057,950.97 Rp 685,389.48
Rp 22,048,416.00 Rp -
Rp 3,460,176.00 Rp 2,306,784.00
Rp 6,157,119.36 Rp 769,639.92
Rp 50,635,830.38 Rp -
Rp 3,448,631.81 Rp (353.16)
Rp 5,643,143.57 Rp -
Rp 21,662,500.00 Rp -
###
Rp 112,816,748.50 Rp (2,609,935.00)
Rp 13,000,000.00 Rp -
Rp 7,503,120.00 Rp 2,501,040.00
Rp 13,740,135.00 Rp 3,713,550.00
Rp 25,179,750.00 Rp -
Rp 4,793,905.00 Rp 129,565.00
Rp 6,702,755.00 Rp (56,090.00)
Rp 3,662,620.00 Rp -
Rp 10,656,463.50 Rp -
Rp 848,000.00 Rp 12,000.00
Rp 26,730,000.00 Rp (8,910,000.00)
###
Rp 285,242,278.75 Rp (6,051,142.61)
Rp 20,338,987.80 Rp 110,545.47
JUMLAH HARGA

CCO SELISIH
9 10 = 9 - 8

Rp 171,065,273.29 Rp 1,216,289.76
Rp 93,838,017.67 Rp (7,377,977.84)
###
Rp 4,724,865,362.33 Rp (85,974,680.18)
Rp 488,472,055.78 Rp 13,484,830.14
Rp 22,912,120.00 Rp (2,186,395.63)
Rp 143,513,073.60 Rp 4,446,112.85
Rp 14,246,941.63 Rp (1,359,518.49)
Rp 176,531,022.72 Rp 5,469,026.82
Rp 27,205,372.86 Rp -
Rp 104,063,524.97 Rp 7,115,604.59
###
Rp 954,013,959.51 Rp (9,480,314.65)
Rp 554,232,651.48 Rp -
JUMLAH HARGA

CCO SELISIH
9 10 = 9 - 8

Rp 39,977,704.91 Rp -
Rp 41,083,615.95 Rp -
Rp 8,708,495.63 Rp -
Rp 2,097,047.33 Rp (51,566.74)
Rp 32,257,001.56 Rp 524,516.36
Rp 138,065,453.33 Rp (6,148,546.67)
Rp 85,434,833.49 Rp (3,804,717.60)
Rp 52,157,155.84 Rp -
###
Rp 2,586,969,381.31 Rp (71,275,346.64)
Rp 288,990,589.71 Rp (2,605.28)
Rp 4,971,137.45 Rp (2,285.58)
Rp 10,738,064.60 Rp (4,571.33)
Rp 67,450,033.81 Rp (19,047.11)
Rp 93,535,537.45 Rp (5,382.95)
Rp 3,520,669.30 Rp (4,496.38)
Rp 26,923,950.16 Rp 4,895,263.67
Rp 6,994,354.78 Rp 2,915,868.79
Rp 135,176,810.62 Rp (8,865,686.18)
Rp 20,637,196.70 Rp (1,876,108.79)
Rp 94,991,475.61 Rp (24,997,756.74)
Rp 8,306,511.65 Rp (845,223.99)
Rp 4,293,060.56 Rp (390,278.23)
Rp 95,457,539.05 Rp (10,949,087.68)
Rp 150,393,278.69 Rp (1,951,210.20)
Rp 3,941,289.42 Rp (437,921.05)
Rp 80,851,581.55 Rp 2,555,633.96
Rp 112,639,777.39 Rp (3,700,542.37)
Rp 31,959,569.51 Rp (495,680.18)
JUMLAH HARGA

CCO SELISIH
9 10 = 9 - 8

Rp 65,190,662.08 Rp 8,301,616.97
Rp 52,843,125.72 Rp 52,843,125.72
Rp 9,373,719.88 Rp (38,441,216.81)
Rp 5,646,450.83 Rp 1,589,675.28
Rp 8,332,381.33 Rp (193,580.58)
Rp 44,349,903.49 Rp 44,349,903.49
Rp 907,730,397.27 Rp (92,788,288.24)
Rp 150,609,055.63 Rp (25,726,895.16)
Rp 45,035,400.65 Rp 9,007,080.13
Rp 56,085,856.40 Rp 13,964,350.19
###
Rp 227,445,383.16 Rp 1,315,339.85
Rp 103,970,958.86 Rp (1,672,998.45)
Rp 28,832,544.00 Rp -
Rp 3,460,176.00 Rp -
Rp 3,078,559.68 Rp -
Rp 58,283,433.00 Rp (1,236,690.00)
Rp 10,366,586.62 Rp 6,496,903.30
Rp 19,453,125.00 Rp (2,271,875.00)
###
Rp 146,849,801.50 Rp (29,638,000.00)
Rp 17,000,000.00 Rp -
Rp 7,503,120.00 Rp -
Rp 15,225,555.00 Rp -
Rp 29,302,750.00 Rp -
Rp 5,700,860.00 Rp -
Rp 7,824,555.00 Rp -
Rp 4,789,580.00 Rp -
Rp 12,401,381.50 Rp -
JUMLAH HARGA

CCO SELISIH
9 10 = 9 - 8

Rp 932,000.00 Rp 8,000.00
Rp 46,170,000.00 Rp (29,646,000.00)
###
Rp 321,114,781.08 Rp 9,618,811.12
Rp 21,700,501.90 Rp -
Rp 203,282,065.33 Rp 13,899,921.19
Rp 96,132,213.85 Rp (4,281,110.07)
###
Rp 3,528,662,417.25 Rp (136,116,876.57)
Rp 562,645,180.27 Rp 5,356,115.03
Rp 25,098,515.63 Rp -
Rp 170,704,681.60 Rp -
Rp 15,606,460.13 Rp -
Rp 209,978,584.32 Rp -
JUMLAH HARGA

CCO SELISIH
9 10 = 9 - 8

Rp 23,095,341.00 Rp -
Rp 118,161,597.60 Rp 5,356,115.03
###
Rp 884,926,643.87 Rp (71,066,447.10)
Rp 554,232,651.48 Rp -
Rp 39,977,704.91 Rp -
Rp 32,196,046.00 Rp -
Rp 8,708,495.63 Rp -
Rp 3,867,505.31 Rp (115,280.31)
Rp 32,257,001.56 Rp 524,516.36
Rp 104,860,488.00 Rp (44,153,512.00)
Rp 64,887,617.54 Rp (27,322,171.15)
Rp 43,939,133.44 Rp -
###
Rp 1,415,343,782.79 Rp (70,011,101.82)
Rp 236,946,582.26 Rp -
Rp 27,484,104.76 Rp 2,287,866.02
Rp 15,675,105.79 Rp 4,932,469.86
Rp 169,083,471.55 Rp (2,202.11)
Rp 5,139,367.83 Rp 1,614,202.14
Rp 5,722,131.81 Rp (375,221.76)
Rp 27,724,784.75 Rp (1,818,018.67)
Rp 7,934,094.95 Rp (971,521.83)
Rp 5,105,320.78 Rp (364,665.77)
Rp 43,871,704.23 Rp 7,311,950.70
Rp 4,703,481.33 Rp 459,553.26
Rp 90,806,320.96 Rp (3,001,861.85)
Rp 64,812,314.92 Rp 2,043,631.55
Rp 4,135,110.66 Rp (271,154.80)
JUMLAH HARGA

CCO SELISIH
9 10 = 9 - 8

Rp 16,156,186.78 Rp (1,261,996.69)
Rp 14,936,791.05 Rp (995,786.07)
Rp 100,322,127.25 Rp (1,469,337.67)
Rp 5,476,469.39 Rp (29,351,954.38)
Rp 8,034,619.90 Rp (8,207,674.16)
Rp 6,265,067.02 Rp (47,343.08)
Rp 104,533,802.16 Rp (26,020,536.21)
Rp 385,773,923.59 Rp (15,504,873.62)
Rp 15,011,800.22 Rp 3,002,360.04
Rp 49,689,098.85 Rp (1,998,986.74)
###
Rp 203,482,785.77 Rp 14,958,792.08
Rp 105,836,384.86 Rp 12,355,525.30
Rp 32,224,608.00 Rp -
Rp 4,594,344.80 Rp 2,287,560.80
Rp 6,157,119.36 Rp -
Rp 31,305,659.00 Rp 158,737.99
Rp 13,914,669.75 Rp 3,119,467.99
Rp 9,450,000.00 Rp (2,962,500.00)
###
Rp 122,982,709.00 Rp 5,457,029.00
Rp 19,000,000.00 Rp (2,000,000.00)
Rp 9,691,530.00 Rp 625,260.00
Rp 18,567,750.00 Rp 742,710.00
Rp 16,786,500.00 Rp 294,500.00
Rp 6,478,250.00 Rp (1,036,520.00)
Rp 3,309,310.00 Rp 2,187,510.00
Rp 5,353,060.00 Rp -
Rp 7,104,309.00 Rp 4,611,569.00
JUMLAH HARGA

CCO SELISIH
9 10 = 9 - 8

Rp 1,052,000.00 Rp 32,000.00
Rp 35,640,000.00 Rp -
###
Rp 339,281,315.55 Rp (20,811,263.76)
Rp 21,942,732.72 Rp 370,482.19
Rp 241,081,152.29 Rp 10,927,902.20
Rp 76,257,430.54 Rp (32,109,648.15)
###
Rp 2,643,642,737.19 Rp 55,800,262.09
Rp 169,354,003.65 Rp 8,098,506.93
Rp 53,868,285.10 Rp (132,294.50)
Rp 66,261,722.52 Rp (162,731.40)
JUMLAH HARGA

CCO SELISIH
9 10 = 9 - 8

Rp 7,260,324.00 Rp -
Rp 41,963,672.03 Rp 8,393,532.83
###
Rp 90,397,965.59 Rp 516,625.84
Rp 75,158,956.32 Rp (1,823,850.08)
Rp 9,671,849.76 Rp (181.48)
Rp 5,567,159.51 Rp 2,340,657.40
###
Rp 71,375,241.51 Rp (147,864,259.26)
Rp 61,867,039.44 Rp -
Rp 4,571,160.88 Rp 2,285,580.44
Rp 4,937,041.20 Rp -
Rp - Rp (1,618,698.53)
Rp - Rp (148,531,141.16)
###
Rp 9,900,122.25 Rp (1,064,481.05)
Rp 4,626,773.25 Rp 3,352,132.45
Rp 2,306,784.00 Rp (1,153,392.00)
Rp 2,966,565.00 Rp (3,263,221.50)
###
Rp 39,197,322.50 Rp 1,692,332.00
Rp 1,250,520.00 Rp 312,630.00
Rp 1,856,775.00 Rp 742,710.00
Rp 736,250.00 Rp 294,500.00
Rp 518,260.00 Rp 129,565.00
Rp 140,225.00 Rp 56,090.00
Rp 311,592.50 Rp 124,637.00
Rp 64,000.00 Rp 16,000.00
Rp 34,319,700.00 Rp 16,200.00
JUMLAH HARGA

CCO SELISIH
9 10 = 9 - 8

###
Rp 2,180,903,208.54 Rp 178,379,629.85
Rp 56,981,365.39 Rp (8,419,033.97)
Rp 547,893,271.52 Rp 54,010,410.72
Rp 52,804,670.07 Rp 6,754,001.27
Rp 40,943,242.99 Rp 5,243,412.59
Rp 471,885,105.88 Rp 439,430.06
Rp 20,274,630.78 Rp 11,039,676.13
Rp 12,552,313.86 Rp (298,859.33)
Rp 34,886,134.52 Rp 6.76
Rp 1,499,304.16 Rp (9.51)
Rp 17,117,000.78 Rp 395,258.41
Rp 6,079,779.31 Rp -
Rp 6,300,000.00 Rp (150,000.00)
Rp 11,622,000.00 Rp 253,500.00
Rp 11,038,239.25 Rp (202,353.65)
Rp 15,874,775.39 Rp 899,791.57
Rp 314,121,762.00 Rp 40,509,762.00
Rp 526,067,960.52 Rp 67,842,761.80
Rp 16,276,027.13 Rp -
Rp 16,685,625.00 Rp 61,875.00
###
Rp 82,514,873.16 Rp 16,041,907.77
Rp 541,271.73 Rp (354,372.18)
Rp 81,973,601.42 Rp 16,396,279.95
###
Rp 190,967,457.31 Rp (5,198,993.32)
Rp 3,060,338.70 Rp (78.90)
Rp 781,056.00 Rp -
JUMLAH HARGA

CCO SELISIH
9 10 = 9 - 8

Rp 1,121,274.00 Rp -
Rp 584,958.00 Rp -
Rp 126,240.00 Rp -
Rp 446,810.70 Rp (78.90)
###
JUMLAH HARGA

CCO SELISIH
9 10 = 9 - 8

Rp 43,213,583.33 Rp (50.88)
Rp 1,776,573.71 Rp -
Rp 5,499,048.06 Rp -
Rp 9,752,394.36 Rp (50.88)
Rp 11,996,120.69 Rp -
Rp 5,993,522.64 Rp -
Rp 8,195,923.88 Rp -
###
Rp 95,120,484.47 Rp (7,476,463.54)
Rp 631,035.20 Rp -
Rp 10,982,183.74 Rp 2,707,794.68
Rp 8,453,867.79 Rp (696.65)
Rp 12,814,696.69 Rp -
Rp 8,338,114.02 Rp -
Rp 6,609,685.66 Rp -
Rp 4,703,654.90 Rp 5,811.13
Rp 4,294,122.82 Rp -
Rp 12,766,849.43 Rp (6,751,122.60)
Rp 25,526,274.22 Rp (3,438,250.10)
###
Rp 33,562,788.49 Rp 2,277,600.00
Rp 5,081,373.36 Rp -
Rp 1,464,315.13 Rp -
Rp 1,400,000.00 Rp -
Rp 7,050,000.00 Rp -
Rp 800,000.00 Rp -
Rp 17,767,100.00 Rp 2,277,600.00
###
Rp 16,010,262.32 Rp -
JUMLAH HARGA

CCO SELISIH
9 10 = 9 - 8

Rp 16,010,262.32 Rp -
###
Rp 482,002,360.23 Rp (1,344,143.05)
Rp 6,749,416.62 Rp (203,989.50)
Rp 1,265,310.72 Rp -
Rp 2,968,812.00 Rp -
Rp 1,127,758.50 Rp (203,989.50)
Rp 204,508.80 Rp -
Rp 1,183,026.60 Rp -
###
Rp 122,497,070.99 Rp -
Rp 4,703,857.70 Rp -
Rp 14,559,902.28 Rp -
Rp 31,808,686.05 Rp -
Rp 39,126,887.46 Rp -
Rp 9,942,262.65 Rp -
Rp 22,355,474.85 Rp -
###
Rp 12,826,040.02 Rp -
Rp 2,637,913.24 Rp -
Rp 1,031,334.75 Rp -
Rp 4,827,763.20 Rp -
Rp 1,296,000.00 Rp -
Rp 801,964.15 Rp -
Rp 2,231,064.68 Rp -
###
Rp 207,817,273.44 Rp (1,140,153.55)
Rp 1,022,277.02 Rp -
Rp 12,251,998.74 Rp 332,897.44
JUMLAH HARGA

CCO SELISIH
9 10 = 9 - 8

Rp 25,957,240.53 Rp (2,786.61)
Rp 42,787,690.36 Rp -
Rp 53,484,612.95 Rp -
Rp 23,142,380.60 Rp 2,285.67
Rp 12,747,250.92 Rp (4,496.38)
Rp 9,769,129.41 Rp (1,498,355.25)
Rp 8,427,067.48 Rp 2,104.14
Rp 3,496,391.87 Rp (4,269.10)
Rp 10,265,639.98 Rp -
Rp 4,465,593.58 Rp 32,466.54
###
Rp 88,442,434.59 Rp -
Rp 50,700,000.00 Rp -
Rp 9,750,000.00 Rp -
Rp 15,076,581.63 Rp -
Rp 1,930,956.00 Rp -
Rp 2,308,919.76 Rp -
JUMLAH HARGA

CCO SELISIH
9 10 = 9 - 8

Rp 5,406,676.80 Rp -
Rp 1,041,170.40 Rp -
Rp 2,228,130.00 Rp -
###
Rp 43,670,124.58 Rp -
Rp 43,670,124.58 Rp -
###
Rp 523,774,870.67 Rp (912,776,653.82)
Rp 20,188,242.90 Rp (593,554.50)
Rp 11,999,988.00 Rp -
Rp 3,406,441.50 Rp (593,554.50)
Rp 4,781,813.40 Rp -
###
Rp 96,856,689.64 Rp (140,246,429.75)
Rp 6,337,690.63 Rp (12,675,381.26)
Rp 37,439,439.75 Rp (21,411,929.97)
Rp 14,684,689.50 Rp (29,369,379.00)
Rp 18,063,185.40 Rp (36,126,370.80)
Rp 8,314,322.76 Rp (16,628,645.52)
Rp 12,017,361.60 Rp (24,034,723.20)
###
Rp 115,623,718.67 Rp (231,248,830.65)
Rp 30,158,049.98 Rp (60,317,493.27)
Rp 85,465,668.69 Rp (170,931,337.38)
###
Rp 267,631,000.00 Rp (493,737,400.00)
Rp 267,631,000.00 Rp (493,737,400.00)
###
Rp 23,475,219.46 Rp (46,950,438.91)
JUMLAH HARGA

CCO SELISIH
9 10 = 9 - 8

Rp 23,475,219.46 Rp (46,950,438.91)
###
Rp 294,438,786.15 Rp (531,099,651.18)
Rp 5,462,826.60 Rp (10,429,638.60)
Rp 3,232,152.00 Rp (5,944,554.00)
Rp 942,711.00 Rp (2,116,191.00)
Rp 1,287,963.60 Rp (2,368,893.60)
###
Rp 132,787,864.16 Rp (216,888,891.96)
Rp 5,121,099.98 Rp (9,418,695.47)
Rp 28,820,721.60 Rp (16,184,466.54)
Rp 32,037,657.30 Rp (58,923,461.48)
Rp 39,408,537.96 Rp (72,479,939.67)
Rp 6,489,227.52 Rp (18,453,740.76)
Rp 20,910,619.80 Rp (41,428,588.05)
###
Rp 115,340,411.42 Rp (222,852,774.73)
Rp 24,368,874.76 Rp (44,816,994.03)
Rp 66,704,912.15 Rp (133,409,824.30)
Rp 24,266,624.51 Rp (44,625,956.40)
###
Rp 40,847,683.97 Rp (80,928,345.89)
Rp 40,847,683.97 Rp (80,928,345.89)
###
Rp 870,405,626.83 Rp (15,787,800.00)
Rp 555,789,978.03 Rp (15,787,800.00)
Rp 74,425,807.20 Rp -
Rp 88,029,926.40 Rp -
Rp 343,614,394.43 Rp -
Rp 32,627,650.00 Rp -
JUMLAH HARGA

CCO SELISIH
9 10 = 9 - 8

Rp 17,092,200.00 Rp (15,787,800.00)
###
Rp 314,615,648.80 Rp -
Rp 6,320,160.00 Rp -
Rp 702,240.00 Rp -
Rp 1,744,960.00 Rp -
Rp 4,797,120.00 Rp -
Rp 11,989,668.80 Rp -
Rp 5,856,500.00 Rp -
Rp 48,285,000.00 Rp -
Rp 229,770,000.00 Rp -
Rp 2,550,000.00 Rp -
Rp 2,600,000.00 Rp -
RENCANA ANGGARAN BIAYA M & E ( RAB )
ADENDUM I
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR DPRD LOMB
LOKASI : SELONG - LOMBOK TIMUR
TAHUN ANGGARAN : 2016

VOLUME
NO. URAIAN PEKERJAAN
TAMBAH/
CCO MC100
KURANG
1 2 3 4 5=3+4
A PENGADAAN DAYA BARU
1 Pengadaan Daya baru untuk gedung DPRD Kab. LOTIM - NTB 197,000.00 (13,200.00) 183,800.00
di Selong - LOTIM . Nyala, lengkap dengan Panel KWH
197 KVA Lengkap terpasang dan menyala. ( Include dgn
Tiang Listrik dll )
- (Tambah Daya dari 13.200 ke 197.000)

B DIESEL GENSET DAN KELENGKAPANNYA


2 Pengadaan Generator Set, Lengkap terpasang 1.00 - 1.00
diatas pondasi & kelengkapannya, terpasang Kap 200 KVA
standby model JK-Power Doosan P086 TI Volt. 380 / 220 Volt
3 Phase, Silent Type Starting System, Electric, Cooling
System, Radiator di lengkapi Cooling Water Level Switch,
Frequency 50 Hz, 1.500 rpm, Alternator Marelli MJB 250 LA4
Governor, Electric 2 bh Residental Silencer + Exhaust Gas
Compresor ( Stainless Steel ) 2 Bh Accu + kabel Accu
DC Engine Panel ( Fault Monitoring System )
Certifacate Of Origin ( C.O.O ) Engine dan Alternator
Lengkap terpasang diatas Pondasi dan berfungsi
Include dengan Tangki Harian 200 liter , lengkap
terpasang dengan otomatic full switch
3 Tangki BBM Mingguan dan Kaki-kakinya Kap. 2500 liter 1.00 - 1.00
terpasang diatas pondasi lengkap dan berfungsi
4 Pemipaan dan pompa BBM menuju mesin Genset dan 1.00 - 1.00
valve - valvenya
5 Pengadaan Peredam Panas dan suara, diruang diesel, 210.00 (14.00) 196.00
dengan Natural Insulation Cool Or Cosy Cellulose Fiber
Warna Abu Abu, Density 80 kg/m2, lapisan tebal 5 cm
6 Panel Utama 1.00 - 1.00
7 Panel AMF - ATS 1.00 - 1.00
8 Power Kabel dari Diesel ke Panel AMF - ATS 12.00 - 12.00
8 X ( 1 X NYY 150 mm2 ) -
9 Power Kabel dari KWH Meter ke Panel Utama 12.00 - 12.00
4 X ( 1 X NYY 150 mm2 ) -
10 Panel Kapasitor Bank 10 X 20 kVAr Lengkap 1.00 - 1.00
11 Power Kabel Dari Panel LVMDP ke Panel Kapasitor 6.00 - 6.00
NYY 2 X ( 4 X 150 mm2 )

C JARINGIN KABEL LISTRIK


12 Pengadaan Kabel Power dari Panel UTAMA / LVMDP ke P. 25.00 - 25.00
Panel Lantai Basement ( NYY 4 X 16 ) mm2 -
13 Pengadaan Kabel Power dari Panel UTAMA /LVMDP ke P. 15.00 20.00 35.00
Panel Lantai 1 NYFGBY 4 X 50 mm2 -
14 Pengadaan Kabel Power dari Panel UTAMA / LVMDP ke P. 20.00 20.00 40.00
VOLUME
NO. URAIAN PEKERJAAN
TAMBAH/
CCO MC100
KURANG
1 2 3 4 5=3+4
Panel Lantai 2 NYFGBY 4 X 70 mm2 -
15 Pengadaan Kabel Power dari Panel UTAMA / LVMDP ke P. 30.00 15.00 45.00
Panel Lantai 3 NYFGBY 4 X 50 mm2 -
16 Pengadaan Kabel Power dari Panel UTAMA / LVMDP ke P. 40.00 20.00 60.00
Panel Lantai 4 NYFGBY 4 X 50 mm2 -
17 Pengadaan Kabel Power dari Panel UTAMA / LVMDP ke P. 45.00 30.00 75.00
Ruang Mesin Lift NYFGBY 4 X 35 mm2 ( Passenger Lift ) -
18 Pengadaan Kabel Power dari Panel UTAMA / LVMDP ke P. 10.00 - 10.00
Ruang Genset NYY 3 X 10 mm2 -
19 Pengadaan Kabel Power dari Panel UTAMA / LVMDP ke P. 70.00 20.00 90.00
Ruang Pompa Hydrant NYY 4 X 16 mm2 -
20 Pengadaan Kabel Power dari Panel Pompa Hydrant ke Panel 3.00 2.00 5.00
Panel Pompa Air Bersih NYY 3 X 10 mm2 -
21 Pengadaan Kabel Power dari Panel Utama ke Panel 10.00 10.00 20.00
Lampu Jalan dan Taman NYY 3 X 6 mm2

Panel Lantai 1
22 Pengadaan Kabel Power dari Panel lantai 1 ke Panel 10.00 (5.00) 5.00
Penerangan, Daya dan AC Lt. 1 NYFGBY 4 X 16 mm2
23 Pengadaan Kabel Power dari Panel lantai 1 ke Panel 10.00 (5.00) 10.00
AC Lt. 1 NYFGBY 4 X 25 mm2
Panel Lantai 2
24 Pengadaan Kabel Power dari Panel lantai 2 ke Panel 10.00 (5.00) 5.00
Penerangan dan Daya Lt. 2 NYFGBY 4 X 16 mm2
25 Pengadaan Kabel Power dari Panel lantai 2 ke Panel 10.00 (5.00) 5.00
AC Lt. 2 NYFGBY 4 X 35 mm2
Panel Lantai 3
26 Pengadaan Kabel Power dari Panel lantai 3 ke Panel 10.00 (5.00) 5.00
Penerangan dan Daya Lt. 3 NYFGBY 4 X 16 mm2
27 Pengadaan Kabel Power dari Panel lantai 3 ke Panel 10.00 (5.00) 5.00
AC Lt. 3 NYFGBY 4 X 25 mm2
Panel Lantai 4
28 Pengadaan Kabel Power dari Panel lantai 4 ke Panel 10.00 (5.00) 5.00
Penerangan dan Daya Lt. 4 NYY 3 X 4 mm2 -
29 Pengadaan Kabel Power dari Panel lantai 4 ke Panel 10.00 (5.00) 5.00
AC Lt. 4 NYY 4 X 25 mm2 -
30 Pengadaan Kabel Power dari Panel lantai 4 ke Panel 10.00 10.00 20.00
Ruang Sound System Lt. 4 NYY 4 X 10 mm2

D PANEL - PANEL Daya / Distribusi


31 Panel Lantai Basement 1.00 - 1.00
32 Panel Lantai 1 1.00 - 1.00
33 Panel Penerangan dan Daya Lt. 1 1.00 - 1.00
34 Panel AC Lt. 1 1.00 - 1.00
35 Panel Lantai 2 1.00 - 1.00
36 Panel Penerangan dan Daya Lt. 2 1.00 - 1.00
37 Panel AC Lt. 2 1.00 - 1.00
38 Panel Lantai 3 1.00 - 1.00
39 Panel Penerangan dan Daya Lt. 3 1.00 - 1.00
40 Panel AC Lt. 3 1.00 - 1.00
41 Panel Lantai 4 1.00 - 1.00
42 Panel Penerangan, Daya dan AC Lt. 4 1.00 1.00 2.00
43 Panel Ruang Sound System Lt. 4 1.00 - 1.00
44 Panel Ruang Mesin Lift 1.00 - 1.00
45 Panel Ruang Genset 1.00 - 1.00
VOLUME
NO. URAIAN PEKERJAAN
TAMBAH/
CCO MC100
KURANG
1 2 3 4 5=3+4
46 Panel Ruang Pompa Hydrant dan Air Bersih 1.00 - 1.00
47 Panel Lampu Jalan / taman 1.00 - 1.00

48 Pengadaan Kabel Tray lengkap dengan clem, gantungan 210.00 55.00 265.00
dan pemasangan ( Electro Galvanis )

E Pengadaan Passenger Elevator Lift ( Kapasitas 15 Orang )


49 Pengadaan Lift Passenger Kapasitas 15 Person ( 1.000 kg ) 2.00 - 2.00
Model LE - P15 ( 1000) CO 4/4 s.s 1.2 mm SS HL
Include Automatic Rescue Device ( ARD ) sistem Duplex
Hoistway Size ( W X D ) ( mm ) 2100 X 2250
Terpasang lengkap, Instalasi Mesin, AC 1 pk ( 1 unit ) di
ruang mesin dan pekerjaan tambahan lain pelengkap
instalasi ijin - ijin dan test comissioning

F Air Conditioning ( AC )
Pengadaan dan Pemasangan AC lengkap pemipaan Refrigerant
dan pemipaan drain, refrigeran, hanger / dudukan
sesuai kapasitas ( 10A - 10 KA , 16 A - 10 KA )
kabel power NYM atau NYY dan kabel kontrol
( Sekelas Panasonic atau DAIKIN )
Lantai Basement
50 Kapasitas : 9.000 BTU /Hr, Dinding ( 1 pk ) Split 5.00 - 5.00
Lengkap Pipa Refrigerant, Pipa/ Selang Drain,
Lantai 1
51 Kapasitas : 9.000 BTU /Hr, Dinding ( 1 pk ) Split 23.00 (5.00) 18.00
Lengkap Pipa Refrigerant, Pipa/ Selang Drain,
52 Kapasitas : 27.000 BTU /Hr, Celling / Casset ( 3 pk ) 5.00 - 5.00
Lengkap Pipa Refrigerant, Pipa/ Selang Drain, Terpasang
Lantai 2
53 Kapasitas : 9.000 BTU /Hr, Dinding ( 1 pk ) Split 37.00 (1.00) 36.00
Lengkap Pipa Refrigerant, Pipa/ Selang Drain,
Lantai 3
54 Kapasitas : 9.000 BTU /Hr, Dinding ( 1 pk ) Split 13.00 - 13.00
Lengkap Pipa Refrigerant, Pipa/ Selang Drain,
55 Kapasitas : 18.000 BTU /Hr, Dinding ( 2 pk ) Split 3.00 - 3.00
Lengkap Pipa Refrigerant, Pipa/ Selang Drain,
56 Kapasitas : 27.000 BTU /Hr, Celling / Casset ( 3 pk ) 2.00 - 2.00
Lengkap Pipa Refrigerant, Pipa/ Selang Drain, Terpasang
Lantai 4
57 Kapasitas : 9.000 BTU /Hr, Dinding ( 1 pk ) Split 1.00 - 1.00
Lengkap Pipa Refrigerant, Pipa/ Selang Drain,
58 Kapasitas : 36.000 BTU /Hr, Celling / Casset ( 4 pk ) 6.00 - 6.00
Lengkap Pipa Refrigerant, Pipa/ Selang Drain, Terpasang
58a Pemindahan Outdoor AC - 73.00 73.00

Exhaus ceiling fan dan Wall Fan


lantai Basement
59 Exhaus ceiling fan lengkap terpasang kabel dan on/of nya 10.00 - 10.00
nempel di plafon , kap 100 CFM untuk toilet dan pantry
sekelas Panasonic , KDK
lantai 1
60 Exhaus ceiling fan lengkap terpasang kabel dan on/of nya 14.00 1.00 15.00
nempel di plafon , kap 100 CFM untuk toilet dan pantry
VOLUME
NO. URAIAN PEKERJAAN
TAMBAH/
CCO MC100
KURANG
1 2 3 4 5=3+4
sekelas Panasonic , KDK
lantai 2
61 Exhaus ceiling fan lengkap terpasang kabel dan on/of nya 7.00 - 7.00
nempel di plafon , kap 100 CFM untuk toilet dan pantry
sekelas Panasonic , KDK
lantai 3
62 Exhaus ceiling fan lengkap terpasang kabel dan on/of nya 13.00 - 13.00
nempel di plafon , kap 100 CFM untuk toilet dan pantry
sekelas Panasonic , KDK
lantai 4
63 Exhaus ceiling fan lengkap terpasang kabel dan on/of nya 5.00 - 5.00
nempel di plafon , kap 100 CFM untuk toilet dan pantry
sekelas Panasonic , KDK

G POMPA Transfer AIR BERSIH dari Ground Tank Ke Roof Tank


64 - Pompa Transfer CR head 50 Meter In Charge Sec 1 1/2 " 2.00 - 2.00
- 2 " Auto stop otomatis 5 - 10 m3 per jam, Head 50 mt,
daya 1 kw ( 1 unit standby atau kerja 2 unit sekaligus )
- Tangki Diafhragma 1.00 (1.00) -
- Accessories dan Kelengkapannya, Gate 1.00 - 1.00
Valve, Check Valve , Strainer dan Flexible, Presur Gauge,
Pressure Transmitter
- Pipa Transfer ke Roof Tank PVC WAVIN AW 1 ,5 " 25.00 55.00 80.00
- Pipa Transfer ke Roof Tank PVC WAVIN AW 2 " 25.00 (25.00) -
- Power kabel pompa dan Switch on/of 1.00 - 1.00
-
65 Tangki Panel Air Bersih Roof Tank Fiber T = 10 ~ 12 mm 1.00 - 1.00
2 X 3 X 2 /M2 tebal (12 mm) mutu terbaik sekelas ASAHI Fiber
Volume 10 m3 Lengkap terpasang
66 - Pompa Pendorong / Boster dari Roof Tank ke outlet 2.00 - 2.00
kran air in Charge Sec 1 1/2 " head 15 - 20 m
Auto stop otomatis 8 m3 per jam ( 1 Unit Stanby )
67 Instalasi Pemipaan dan Accessories Gate Valve, Check 1.00 - 1.00
valve dll.

H Pekerjaan SUMUR DALAM


68 Pengadaan dan Pemasangan SUMUR DALAM 70 MT
Pembersihan persiapan lahan material instalasi 1.00 - 1.00
dan pasang ( Sebelum Pompa di masukkan ke sumur dalam
telah di kompres / di Vacum air dalam kondisi jernih )
- Casing pipe di 6 " 75.00 - 75.00
- Casing pipe di 4 " 8.00 - 8.00
- Screen Low Suction steel 4" 4.00 - 4.00
- Reducer 3" X 4 " 1.00 - 1.00
- Grevel Pack 1.00 - 1.00
- Drilling di 6" dan dia 4" completed with electric 1.00 - 1.00
logging measurement pumping test water quality - -
and laboratory - -
- Grundfos & WILO submersible pump suply TWI 4.09 Cap 1.00 - 1.00
2 - 3 lt / detik - -
- Panel pump cap 7,5 KW equipped with cables 1.00 - 1.00
pump dan electroda masa WLC - -
- Pump boundaries panel 1.00 (1.00) -
VOLUME
NO. URAIAN PEKERJAAN
TAMBAH/
CCO MC100
KURANG
1 2 3 4 5=3+4
- Cable Pump NYY 4 X 6 mm2 100.00 - 100.00
- Cable Pump NYYHY 3 X 4 mm2 100.00 - 100.00
- Equipment : Gate valve, Check valve, water meter 1.00 - 1.00
presure gauge, and controlled tap - -
- Pipa supply 1,5" - 2,0" GIP medium A 80.00 - 80.00
- Pipa Distribusi 2 " PVC WAVIN AW, ke Groundtank 10.00 - 10.00
- Assesories , gantungan, fitting dan asesoriesnya , 1.00 - 1.00
dan valve valve dan lain - lain
( Setelah Pengeboran sumur harus dikompres / vacum
di sedot lumpur sampai air yg di hasilkan jernih )

I Lampu Penerangan
Pengadaan Pemasangan Lampu setara Philips,Visilite dan
Interlite, lengkap dgn gantungan ,dan stop kontak dalam pipa
conduit hanger termasuk bobokan, terpasang nyala dan perapian
kembali
Lantai Basement
69 Pengadaan Pemasangan Lampu dengan lampu TL -
Prismatic RMI 2 X 18 watt
70 Pengadaan Pemasangan Lampu dengan lampu TL -
Prismatic RMI 2 X 18 watt lengkap dengan battery
71 Pengadaan Pemasangan Lampu dengan Lampu Down Light 5.00 - 5.00
FBH/FBS 145 Tornado PLC 15 watt
72 Pengadaan Pemasangan Lampu dengan Lampu Down Light -
FBH/FBS 145 Tornado PLC 15 watt Lengkap dgn battery
73 Pengadaan Pemasangan Lampu dengan Lampu TL V shape 56.00 - 56.00
2 X 18 watt
74 Pengadaan Pemasangan Lampu dengan lampu Down Light 4.00 - 4.00
Recessed 1 X 10 watt ( Toilet )
75 Pengadaan Pemasangan Lampu dengan lampu Dinding 1.00 - 1.00
8 watt
76 Pengadaan Pemasangan Stop Kontak 200 watt
kap kontak 16 Am , untuk wall
- Elv. 40 16.00 - 16.00
- 1,5 mt 5.00 - 5.00
- 250 cm TV 1.00 1.00 2.00
77 Pengadaan Pemasangan saklar kap 16 Am -
- Tunggal 7.00 - 7.00
- Ganda 16.00 - 16.00
- Hotel -
78 Pemasangan titik instalasi lampu dan stop kontak 88.00 - 88.00
dalam pipa conduit

Lantai 1
79 Pengadaan Pemasangan Lampu dengan lampu Hias 1.00 - 1.00
Gantung 16 X 5 watt -
80 Pengadaan Pemasangan Lampu dengan lampu TL 57.00 - 57.00
Prismatic RMI 2 X 18 watt -
81 Pengadaan Pemasangan Lampu dengan lampu TL 5.00 - 5.00
Prismatic RMI 2 X 18 watt lengkap dengan battery -
82 Pengadaan Pemasangan Lampu dengan Lampu Down Light 90.00 - 90.00
FBH/FBS 145 Tornado PLC 15 watt -
83 Pengadaan Pemasangan Lampu dengan Lampu Down Light 3.00 - 3.00
FBH/FBS 145 Tornado PLC 15 watt Lengkap dgn battery -
84 Pengadaan Pemasangan Lampu dengan Lampu TL V shape -
VOLUME
NO. URAIAN PEKERJAAN
TAMBAH/
CCO MC100
KURANG
1 2 3 4 5=3+4
2 X 18 watt -
85 Pengadaan Pemasangan Lampu dengan lampu Down Light 4.00 4.00 8.00
Recessed 1 X 10 watt ( Toilet ) -
86 Pengadaan Pemasangan Lampu dengan lampu Dinding 3.00 (1.00) 2.00
8 watt -
87 Pengadaan Pemasangan Stop Kontak 200 watt -
kap kontak 16 Am , untuk wall -
- Elv. 0 ( stop kontak lantai bahan plate ) 3.00 - 3.00
- Elv. 40 70.00 - 70.00
- 1,5 mt 4.00 - 4.00
- 250 cm TV 2.00 - 2.00
88 Pengadaan Pemasangan saklar kap 16 Am -
- Tunggal 13.00 1.00 14.00
- Ganda 36.00 - 36.00
- Hotel 2.00 (2.00) -
89 Pemasangan titik instalasi lampu dan stop kontak 243.00 1.00 244.00
dalam pipa conduit

Lantai 2
90 Pengadaan Pemasangan Lampu dengan lampu TL 72.00 - 72.00
Prismatic RMI 2 X 18 watt -
91 Pengadaan Pemasangan Lampu dengan lampu TL 4.00 - 4.00
Prismatic RMI 2 X 18 watt lengkap dengan battery -
92 Pengadaan Pemasangan Lampu dengan Lampu Down Light 84.00 - 84.00
FBH/FBS 145 Tornado PLC 15 watt -
93 Pengadaan Pemasangan Lampu dengan Lampu Down Light 6.00 - 6.00
FBH/FBS 145 Tornado PLC 15 watt Lengkap dgn battery -
94 Pengadaan Pemasangan Lampu dengan Lampu TL V shape -
2 X 18 watt -
95 Pengadaan Pemasangan Lampu dengan lampu Down Light 4.00 - 4.00
Recessed 1 X 10 watt ( Toilet ) -
96 Pengadaan Pemasangan Lampu dengan lampu Dinding 3.00 - 3.00
8 watt -
97 Pengadaan Pemasangan Stop Kontak 200 watt -
kap kontak 16 Am , untuk wall -
- Elv. 40 64.00 - 64.00
- 1,5 mt 3.00 - 3.00
- 250 cm TV 2.00 1.00 3.00
98 Pengadaan Pemasangan saklar kap 16 Am -
- Tunggal 5.00 - 5.00
- Ganda 32.00 - 32.00
- Hotel 2.00 (2.00) -
99 Pemasangan titik instalasi lampu dan stop kontak 242.00 - 242.00
dalam pipa conduit

Lantai 3
100 Pengadaan Pemasangan Lampu dengan lampu TL 50.00 - 50.00
Prismatic RMI 2 X 18 watt -
101 Pengadaan Pemasangan Lampu dengan lampu TL 3.00 - 3.00
Prismatic RMI 2 X 18 watt lengkap dengan battery -
102 Pengadaan Pemasangan Lampu dengan Lampu Down Light 83.00 - 83.00
FBH/FBS 145 Tornado PLC 15 watt -
103 Pengadaan Pemasangan Lampu dengan Lampu Down Light 8.00 - 8.00
FBH/FBS 145 Tornado PLC 15 watt Lengkap dgn battery -
104 Pengadaan Pemasangan Lampu dengan Lampu TL V shape - -
VOLUME
NO. URAIAN PEKERJAAN
TAMBAH/
CCO MC100
KURANG
1 2 3 4 5=3+4
2 X 18 watt -
105 Pengadaan Pemasangan Lampu dengan lampu Down Light 8.00 - 8.00
Recessed 1 X 10 watt ( Toilet ) -
106 Pengadaan Pemasangan Lampu dengan lampu Dinding 2.00 (1.00) 1.00
8 watt -
107 Pengadaan Pemasangan Stop Kontak 200 watt -
kap kontak 16 Am , untuk wall -
- Elv. 40 60.00 - 60.00
- 1,5 mt 3.00 - 3.00
- 250 cm TV 2.00 - 2.00
108 Pengadaan Pemasangan saklar kap 16 Am -
- Tunggal 5.00 - 5.00
- Ganda 29.00 - 29.00
- Hotel 2.00 (2.00) -
109 Pemasangan titik instalasi lampu dan stop kontak 219.00 - 219.00
dalam pipa conduit

Lantai 4
110 Pengadaan Pemasangan Lampu dengan lampu TL 1.00 - 1.00
Prismatic RMI 2 X 18 watt -
111 Pengadaan Pemasangan Lampu dengan lampu TL 1.00 - 1.00
Prismatic RMI 2 X 18 watt lengkap dengan battery -
112 Pengadaan Pemasangan Lampu dengan Lampu Down Light 58.00 - 58.00
FBH/FBS 145 Tornado PLC 15 watt -
113 Pengadaan Pemasangan Lampu dengan Lampu Down Light 10.00 - 10.00
FBH/FBS 145 Tornado PLC 15 watt Lengkap dgn battery -
114 Pengadaan Pemasangan Lampu dengan Lampu TL V shape - - -
2 X 18 watt -
115 Pengadaan Pemasangan Lampu dengan lampu Down Light - - -
Recessed 1 X 10 watt ( Toilet ) -
116 Pengadaan Pemasangan Lampu dengan lampu Dinding - - -
8 watt -
117 Pengadaan Pemasangan Stop Kontak 200 watt -
kap kontak 16 Am , untuk wall -
- Elv. 40 6.00 - 6.00
- 1,5 mt - - -
- 250 cm TV - - -
118 Pengadaan Pemasangan saklar kap 16 Am -
- Tunggal -
- Ganda 10.00 - 10.00
- Hotel - - -
119 Pemasangan titik instalasi lampu dan stop kontak 76.00 - 76.00
dalam pipa conduit

Lampu Penerangan Jalan dan Lampu Taman


Pengadaan dan pemasangan lampu lengkap terpasangan
di atas pondasi dan menyala
120 Lampu Penerangan Jalan ( Lampu Tunggal )
Type lampu : Street LED 30 W Voltage : 85 ~ 265 V 4.00 - 4.00
Color Temperature : Day Light White : 6000 - 6500 K
Lampu Lengkap otomatis Photo cell ( LDR ) dan MCB
Pole / Tiang : Besi Galvanish ( 10 Meter )
Kabel NYY 3 X 3 mm

121 Lampu Penerangan Taman


VOLUME
NO. URAIAN PEKERJAAN
TAMBAH/
CCO MC100
KURANG
1 2 3 4 5=3+4
Type lampu : GL 351 / BULAT 500 LHE Max : 23 W 3.00 1.00 4.00
Lampholder E. 27 Dia 1.50 " Lengkap dengan tiang
Kabel NYY 3 X 2,5 mm

Lampu Penerangan Power House ( Ruang genset )


122 Pengadaan Pemasangan Lampu dengan lampu TKO / 6.00 - 6.00
V Shape TL 2 X 18 watt
123 Stop Kontak 1.200 watt 32 Amp 2.00 - 2.00
124 Sakelar Ganda 1.00 - 1.00
125 Instalasi Titik Lampu ( Instalasi dalam Pipa Konduit ) 6.00 - 6.00
Kabel NYM 3 X 2,5 mm ( exposs )

Lampu Penerangan Ruang Staff Engineering


126 Pengadaan Pemasangan Lampu dengan lampu TKO / 4.00 (4.00) -
V Shape TL 2 X 18 watt -
127 Stop Kontak 1.200 watt 32 Amp 3.00 (3.00) -
128 Sakelar Ganda 1.00 (1.00) -
129 Instalasi Titik Lampu ( Instalasi dalam Pipa Konduit ) 7.00 (7.00) -
Kabel NYM 3 X 2,5 mm ( exposs )
Lampu Penerangan Gudang Engineering
130 Pengadaan Pemasangan Lampu dengan lampu TKO / 4.00 (4.00) -
V Shape TL 2 X 18 watt -
131 Stop Kontak 1.200 watt 32 Amp 2.00 (2.00) -
132 Sakelar Ganda 1.00 (1.00) -
133 Instalasi Titik Lampu ( Instalasi dalam Pipa Konduit ) 6.00 (6.00) -
Kabel NYM 3 X 2,5 mm ( exposs )

Lampu Penerangan Ruang Pompa Hydrant dan Air Bersih


134 Pengadaan Pemasangan Lampu V Shape 2 X 18 Watt 4.00 - 4.00
135 Stop Kontak 1.200 watt 32 Amp 2.00 (1.00) 1.00
136 Sakelar Ganda 1.00 1.00 2.00
137 Instalasi Titik Lampu ( Instalasi dalam Pipa Konduit ) 5.00 1.00 6.00
Stop Kontak Kabel NYM 3 X 2,5 mm ( exposs )

Lampu Penerangan Pos Jaga Satpam ( Pos I )


138 Pengadaan Pemasangan Lampu dengan lampu FBH/FBS 1.00 1.00 2.00
145 PLC 15 watt Down Light -
139 Pengadaan Pemasangan Lampu XL 10 Watt ( Toilet ) 1.00 (1.00) -
140 Pengadaan Pemasangan Stop Kontak 200 watt -
kap kontak 16 Am , untuk wall -
- Elv. 40 2.00 - 2.00
141 Sakelar Ganda 1.00 - 1.00
142 Instalasi Titik Lampu ( Instalasi dalam Pipa Konduit ) 4.00 - 4.00
Kabel NYM 3 X 2,5 mm

Lampu Penerangan Pos Jaga Satpam ( Pos II )


143 Pengadaan Pemasangan Lampu dengan lampu FBH/FBS 1.00 1.00 2.00
145 PLC 15 watt Down Light -
144 Pengadaan Pemasangan Lampu XL 10 Watt ( Toilet ) 1.00 (1.00) -
145 Pengadaan Pemasangan Stop Kontak 200 watt -
kap kontak 16 Am , untuk wall -
- Elv. 40 2.00 - 2.00
146 Sakelar Ganda 1.00 - 1.00
147 Instalasi Titik Lampu ( Instalasi dalam Pipa Konduit ) 4.00 - 4.00
VOLUME
NO. URAIAN PEKERJAAN
TAMBAH/
CCO MC100
KURANG
1 2 3 4 5=3+4
Kabel NYM 3 X 2,5 mm

Lampu Penerangan Pos Jaga Satpam ( Pos III )


148 Pengadaan Pemasangan Lampu dengan lampu FBH/FBS 1.00 1.00 2.00
145 PLC 15 watt Down Light -
149 Pengadaan Pemasangan Lampu XL 10 Watt ( Toilet ) 1.00 (1.00) -
150 Pengadaan Pemasangan Stop Kontak 200 watt -
kap kontak 16 Am , untuk wall -
- Elv. 40 2.00 - 2.00
151 Sakelar Ganda 1.00 - 1.00
152 Instalasi Titik Lampu ( Instalasi dalam Pipa Konduit ) 4.00 - 4.00
Kabel NYM 3 X 2,5 mm

J PEKERJAAN FIRE ALARM


Pengadaan dan Pemasangan Fire Alarm Lantai 1, 2, 3 dan 4
Pengadaan pemasangan Fire Alarm lengkap terpasa
ng, Instalasi dalam pipa hight impact
153 Pengadaan pemasangan MCFA ( Master Control 1.00 - 1.00
Fire Alarm ) lengkap terpasang sesuai spesifikasi
teknik gambar kapsitas 10 ZONE setara NOHMI,
NITTAN, CLUBFIRE
154 Manual Fire Alarm Box recess mounting type contact 5.00 - 5.00
rating 30 volt-DC, 0,5 A, FMM series -
155 Photoelectric somoke detector surface mounting 2.00 2.00 4.00
type FDK series kap area 90 m2 -
156 Fixed temperatur detector special,65 derajat C FDL 3.00 (1.00) 2.00
series kap area 40 m2 -
157 Rate of Rise Detector ( ROR ) surface mounting type 132.00 1.00 133.00
sensityvity 10 derajat C / min Kap area 90 m2 -
158 Annunciator sesuai kap 10 zone ( LCD ) -
159 Terminal Box, termasuk modul addressable 6 line 5.00 - 5.00
160 Location lamp type FLP, rate current 21 mA 5.00 - 5.00
161 Fire Alarm Bell, nominal sound level more than 5.00 - 5.00
90 dB -
162 End of line Resistor 10 ohm - 1/2 watt 5.00 - 5.00
163 Terminal Box Pusat 1.00 - 1.00
164 Instalasi NYA 3 X 1,5 mm2 dalam Pipa Conduit High 133.00 - 133.00
Impact -
165 Instalasi Power dan Grounding 1.00 - 1.00
166 Instalasi Kabel Riser STP AWG 18, NYA 2 x 1.5 mm2 160.00 - 160.00
167 Include HP Conduit -
168 Instalasi Kabel Anunciator STP AWG 18, NYA 2 x 1.5 140.00 - 140.00
mm2 -
169 Pengadaan dan Pemasangan Fire Extinguishers 10.00 - 10.00
Dray Chemical, ABC SERVVO POWDER Kap 4,5 kg -
170 Test dan ijin - ijin 1.00 - 1.00

K INSTALASI TELEPON
1. Lantai - 1
171 Pengadaan dan pemasangan peralatan utama Telepon, 1.00 - 1.00
berikut dengan support material bantu lainnya sesuai
dengan spesifikasi dan gambar rencana Pengadaan dan
pemasangan 1 unit PABX
- 3 ex Lines
VOLUME
NO. URAIAN PEKERJAAN
TAMBAH/
CCO MC100
KURANG
1 2 3 4 5=3+4
- 30 extentions
1. Lantai - Basement
172 Pesawat telepon analog standart 1.00 - 1.00
173 Terminal Boks telepon Kapasitas 30 pairs 1.00 - 1.00
174 Outlet Telepon RJ 11 1.00 - 1.00
175 Instalasi Telepon ITC 2 X 2 x 0,6 mm 1.00 - 1.00
176 Instalasi Kabel Feeder Telepon ITC 20 X 2 x 0,6 mm 10.00 15.00 25.00
1. Lantai - 1 -
177 Operator Console 1.00 - 1.00
178 Pesawat telepon analog standart 8.00 - 8.00
179 MDF 150 Pairs 1.00 - 1.00
180 Terminal Boks telepon Kapasitas 30 pairs 1.00 - 1.00
181 Outlet Telepon RJ 11 8.00 - 8.00
182 Instalasi Telepon ITC 2 X 2 x 0,6 mm 8.00 - 8.00
183 Instalasi Kabel Feeder Telepon ITC 20 X 2 x 0,6 mm 80.00 (50.00) 30.00
2. Lantai - 2 -
184 Pesawat telepon analog standart 17.00 - 17.00
185 Terminal Boks telepon Kapasitas 30 pairs 1.00 - 1.00
186 Outlet Telepon RJ 11 17.00 - 17.00
187 Instalasi Telepon ITC 2 X 2 x 0,6 mm 17.00 - 17.00
188 Instalasi Kabel Feeder Telepon ITC 20 X 2 x 0,6 mm 170.00 (130.00) 40.00
3. Lantai - 3 -
189 Pesawat telepon analog standart 8.00 - 8.00
190 Terminal Boks telepon Kapasitas 30 pairs 1.00 - 1.00
191 Outlet Telepon RJ 11 8.00 - 8.00
192 Instalasi Telepon ITC 2 X 2 x 0,6 mm 8.00 - 8.00
193 Instalasi Kabel Feeder Telepon ITC 50 X 2 x 0,6 mm 80.00 (30.00) 50.00
4. Lantai - 4 -
194 Pesawat telepon analog standart 1.00 - 1.00
195 Terminal Boks telepon Kapasitas 30 pairs 1.00 - 1.00
196 Outlet Telepon RJ 11 1.00 - 1.00
197 Instalasi Telepon ITC 2 X 2 x 0,6 mm 1.00 - 1.00
198 Instalasi Kabel Feeder Telepon ITC 50 X 2 x 0,6 mm 10.00 50.00 60.00

L INSTALASI SOUND SYSTEM GEDUNG


1. Lantai - 1
199 Pengadaan dan pemasangan peralatan utama Sound
system berikut dengan material bantu lainnya sesuai
dengan spesifikasi dan gbr rencana :
- Management Amplifier 3 zone / 240 Watt VM-2240 1.00 - 1.00
- Remote microphone 3 zone with chime & emergency call 1.00 - 1.00
- Emergency Modul System EV-200 1.00 - 1.00
- CD/DVD + Flash disc socket Player 2.00 - 2.00
- COS 1.00 - 1.00
- MDF 1.00 - 1.00
- Cabinet Rack w/. Accessories 1.00 - 1.00

2. Lantai - Basement
200 Horn Speaker 10/15W ZH-615SM 4.00 - 4.00
201 Ceilling Speaker 3/6 W ZS-646R 1.00 (1.00) -
202 Volume Control 6W ZV-064 1.00 - 1.00
203 Volume Control 30W ZV-303 -
204 Terminal Boks Sound System 1.00 - 1.00
205 Instalasi Horn Speaker NYMHy 2x 1,5 mm 4.00 - 4.00
VOLUME
NO. URAIAN PEKERJAAN
TAMBAH/
CCO MC100
KURANG
1 2 3 4 5=3+4
206 Instalasi Ceilling Speaker NYMHy 2x 1,5 mm 1.00 - 1.00
207 Instalasi Volume Control NYMHy 3 x 1,5 mm 1.00 - 1.00
208 Kabel Feeder NYMHy 3 x 2,5 mm 48.00 (23.00) 25.00

3. Lantai - 1
209 Horn Speaker 10/15W ZH-615SM -
210 Ceilling Speaker 3/6 W ZS-646R 9.00 - 9.00
211 Volume Control 6W ZV-064 2.00 (2.00) -
212 Volume Control 30W ZV-303 3.00 3.00
213 Terminal Boks Sound System 1.00 - 1.00
214 Instalasi Horn Speaker NYMHy 2x 1,5 mm - -
215 Instalasi Ceilling Speaker NYMHy 2x 1,5 mm 9.00 - 9.00
216 Instalasi Volume Control NYMHy 3 x 1,5 mm 5.00 - 5.00
217 Kabel Feeder NYMHy 3 x 2,5 mm 112.00 (77.00) 35.00

4. Lantai - 2
218 Ceilling Speaker 3/6 W ZS-646R 11.00 - 11.00
219 Volume Control 6W ZV-064 3.00 (3.00) -
220 Volume Control 30W ZV-303 2.00 1.00 3.00
221 Terminal Boks Sound System 1.00 - 1.00
222 Instalasi Ceilling Speaker NYMHy 2x 1,5 mm 11.00 - 11.00
223 Instalasi Volume Control NYMHy 3 x 1,5 mm 5.00 - 5.00
224 Kabel Feeder NYMHy 3 x 2,5 mm 128.00 (83.00) 45.00

5. Lantai - 3
225 Ceilling Speaker 3/6 W ZS-646R 8.00 - 8.00
226 Volume Control 6W ZV-064 3.00 (3.00) -
227 Volume Control 30W ZV-303 2.00 1.00 3.00
228 Terminal Boks Sound System 1.00 - 1.00
229 Instalasi Ceilling Speaker NYMHy 2x 1,5 mm 8.00 - 8.00
230 Instalasi Volume Control NYMHy 3 x 1,5 mm 5.00 - 5.00
231 Kabel Feeder NYMHy 3 x 2,5 mm 104.00 (49.00) 55.00

6. Lantai - 4
232 Ceilling Speaker 3/6 W ZS-646R 3.00 - 3.00
233 Volume Control 6W ZV-064 1.00 - 1.00
234 Volume Control 30W ZV-303 - -
235 Terminal Boks Sound System 1.00 - 1.00
236 Instalasi Ceilling Speaker NYMHy 2x 1,5 mm 3.00 - 3.00
237 Instalasi Volume Control NYMHy 3 x 1,5 mm 1.00 - 1.00
238 Kabel Feeder NYMHy 3 x 2,5 mm 32.00 33.00 65.00

M INSTALASI SOUND SYSTEM RUANG SIDANG DEWAN


Lantai - 3
Pengadaan dan pemasangan peralatan Sound System
pada ruang sidang dewan dengan sistem Wireless Con-
ferences
239 Paket sound system Meeting Room PREMIUM QSC untuk 1.00 - 1.00
Ruang Sidang Dewan :
- Coloum Speaker QSC
- Mixer Rack Behringer
- Power Amplifier QSC
- Equalizer DBX
- Aural Exciter Aphex
VOLUME
NO. URAIAN PEKERJAAN
TAMBAH/
CCO MC100
KURANG
1 2 3 4 5=3+4
- Mic Wireless Handheld AKG
- Mic Wireless Clip On AKG
- Rack Case 12 U
- Bracket Speaker
- Kabel Mic
- Kabel Speaker
- Set Up Instalasi

240 Paket Wireless Conference Microphones


- KERZT MC - 8U dengan Mikrofon Wireless Konferensi 4.00 - 4.00
sebanyak 8 buah ( 30 Chanel )
( Catatan : 1 Set = 8 bh Mic Wireless Konference )

N CCTV System
Pengadaan Pemasangan CCTV System setara SONY , INFINITY ,
COMMAX , dan EVERFOCUS, lengkap dan terpasang , berfungsi
dengan baik dan perapiannya
Lantai - Basement
241 Fix Color Dome Camera SID-50
242 Automatic Color Dome Camera SID-50
243 Standard Color Camera ( Day & Night ) SDC-415, Lens LMVZ-35 8.00 - 8.00
244 Variable Focal Lens WV-LZA61/2 8.00 - 8.00
245 Bracket SK-622 8.00 - 8.00
246 Housing SH-015 8.00 - 8.00
247 Instalasi CCTV Coaxial Cable RG-6 8.00 - 8.00
248 Instalasi Power CCTV NYMHy 2x1,5 mm 8.00 - 8.00
Lantai - 1 -
249 24 Channel DVR ( Integrated Digital Video Recording ) System S 1.00 1.00 2.00
with resolution 720 x 576, SVR - 1650 di Lobby ruang Security -
250 25" Color TV/Monitor SAM-25M 2.00 - 2.00
251 Fix Color Dome Camera SID-50 3.00 - 3.00
252 Automatic Color Dome Camera SID-50 3.00 - 3.00
253 Standard Color Camera ( Day & Night ) SDC-415, Lens LMVZ-35 8.00 - 8.00
254 Variable Focal Lens WV-LZA61/2 8.00 - 8.00
255 Bracket SK-622 8.00 - 8.00
256 Housing SH-015 8.00 - 8.00
257 Instalasi CCTV Coaxial Cable RG-6 14.00 - 14.00
258 Instalasi Power CCTV NYMHy 2x1,5 mm 14.00 - 14.00
Lantai - 2 -
259 Fix Color Dome Camera SID-50 4.00 - 4.00
260 Automatic Color Dome Camera SID-50 1.00 - 1.00
261 Standard Color Camera ( Day & Night ) SDC-415, Lens LMVZ-35 4.00 - 4.00
262 Variable Focal Lens WV-LZA61/2 2.00 - 2.00
263 Bracket SK-622 4.00 - 4.00
264 Housing SH-015 4.00 - 4.00
265 Instalasi CCTV Coaxial Cable RG-6 9.00 - 9.00
266 Instalasi Power CCTV NYMHy 2x1,5 mm 9.00 - 9.00
Lantai - 3 -
267 Fix Color Dome Camera SID-50 6.00 - 6.00
268 Automatic Color Dome Camera SID-50 -
269 Standard Color Camera ( Day & Night ) SDC-415, Lens LMVZ-35 1.00 - 1.00
270 Variable Focal Lens WV-LZA61/2 2.00 - 2.00
271 Bracket SK-622 1.00 - 1.00
272 Housing SH-015 1.00 - 1.00
273 Instalasi CCTV Coaxial Cable RG-6 7.00 - 7.00
VOLUME
NO. URAIAN PEKERJAAN
TAMBAH/
CCO MC100
KURANG
1 2 3 4 5=3+4
274 Instalasi Power CCTV NYMHy 2x1,5 mm 7.00 - 7.00
Lantai - 4 -
275 Fix Color Dome Camera SID-50 2.00 - 2.00
276 Automatic Color Dome Camera SID-50 - 1.00 1.00
277 Instalasi CCTV Coaxial Cable RG-6 2.00 1.00 3.00
278 Instalasi Power CCTV NYMHy 2x1,5 mm 2.00 1.00 3.00

O Pengadaan Pemasangan MATV System, Lengkap dan terpasang


berfungsi dengan baik dan perapiannya
Lantai Basement
279 Terminal Boks MATV 1.00 - 1.00
280 Outlet Televisi Coaxial Single 2.00 - 2.00
281 Instalasi Televisi Coaxial Cable RG-6 2.00 - 2.00
282 Kabel Feeder Coaxial Cable RG-11 - - -
283 Booster 1.00 - 1.00

Lantai 1
284 Antena UHF / VHF 25 Elements
285 Antenna Parabola 1.00 - 1.00
286 TV Modulator 1.00 - 1.00
287 TV Demodulator -
288 Setellite Receiver 1.00 - 1.00
289 Line Amplifier 1.00 - 1.00
290 Power Divider 1.00 - 1.00
291 Head End Amplifier and Active Combiner 1.00 - 1.00
292 Splitters & Tap Off 1.00 - 1.00
293 Pemutar Compact Disc 1.00 - 1.00
294 Rack Standart 1.00 - 1.00
295 Booster 1.00 - 1.00
296 Terminal Boks MATV 1.00 - 1.00
297 Outlet Televisi Coaxial Single 2.00 - 2.00
298 Instalasi Televisi Coaxial Cable RG-6 2.00 - 2.00
299 Kabel Feeder Coaxial Cable RG-11 -
Lantai 2 -
300 Terminal Boks MATV 1.00 - 1.00
301 Outlet Televisi Coaxial Single 3.00 - 3.00
302 Instalasi Televisi Coaxial Cable RG-6 3.00 - 3.00
303 Kabel Feeder Coaxial Cable RG-11 -
304 Booster 1.00 - 1.00
Lantai 3 -
305 Terminal Boks MATV 1.00 - 1.00
306 Outlet Televisi Coaxial Single 2.00 - 2.00
307 Instalasi Televisi Coaxial Cable RG-6 2.00 - 2.00
308 Kabel Feeder Coaxial Cable RG-11 - - -
309 Booster 1.00 - 1.00

P PENANGKAL PETIR
310 - Pengadaan dan pemasangan penangkal petir radius
80 - 100 mtr dengan spit dengan tiang tinggi : 2 mtr 2.00 - 2.00
( Spesifikasi sekelas : Current, Viking atau Thomas )
311 - Kabel pentanahan 1 X BC 70 mm2 lengkap terpasang 210.00 - 210.00
dengan klem, hanger, dan kelengkapannya
312 - Pentanahan dengan pipa GIP 2 " Medium didalamnya 3.00 (1.00) 2.00
dengan plat busbar L 3cm X t ,6 mm sepanjang 8 - 10
VOLUME
NO. URAIAN PEKERJAAN
TAMBAH/
CCO MC100
KURANG
1 2 3 4 5=3+4
mtr di dalam tanah
313 - Bak kontrol 40 cm X 40 cm dengan kedalaman 40 cm 3.00 (1.00) 2.00
314 - Pekerjaan sipil 1.00 - 1.00
315 - tes dan Ijin - Ijin 1.00 - 1.00

Q HYDRANT WORK
Pengadaan, Pemasangan Pompa Hydrant & termasuk
Instalasi Lengkap terpasang standard Internasional,
Capacity 400 GPM, Product, Peterson, NTT & Willo, Firebank
Amstrong, Perkins, Mitshubishi Pompa Ebara
set panel power, control, battery & charge Installed in
a set , valve, fitting & accessories pipa
316 Main pump Diesel ( Mitshubisi, Yanmar, Perkins )
Capacity : 400 USGPM 90 m3/jam ( 1.514 ltr / mnt ) 1.00 - 1.00
Total Head : 80 mt
Power : 40 Kw

317 Main pump Electrik ( EBARA PUMP ) 1.00 - 1.00


Capacity : 400 USGPM 90 m3/jam ( 1.514 ltr / mnt )
Total Head : 85 mt
Power : 40 Kw
( Ebara , Grundfos , Torishima )

318 Jocky Pump ( Grundfos ) 1.00 - 1.00


Capacity : 25 GPM
Total Head : 110 mt
Power : 5 Kw ~ 7 Kw
Type : Multistage Centrigugal Multiver MVI 400

Di Luar Gedung Di samping dan sisi belakang


319 Pengadaan dan pemasangan siamise Conection termasuk 2.00 - 2.00
Instalasi, pondasi dan pemasangan check valve
320 Outdoor Box complete with hoise 20 mtr - 2,5 " nosel 2,5 " 2.00 - 2.00
jet & spray, lengkap terpasang diatas pondasi
321 Pengadaan dan Pemasangan Hydrant Pillar 4" X 2" X 2,5" 4.00 (2.00) 2.00
termasuk instalasi, pondasi terpasang
322 Gate Valve Air vent Dia 1 1/2 " 2.00 - 2.00
323 Automatic Air vent Dia 1 1/2 " 2.00 - 2.00
324 Exhaus fan lengkap terpasang kabel dan on / of nya 1.00 3.00 4.00
nempel di dinding , kap 750 CFM di ruang pompa

325 - Instalasi Pemipaan Hydrant dalam gedung menggunakan


pipa Black Steel Sch 40 ASTM A 53 - 90 b, ex RISER,
BAKRI, PPI
Pemasangan dalam gedung harus di cat dengan cat / coating
anti karat / korosi sebelum di cat warna merah
Halaman dan Inlet ke Lantai 1
- Pipa Black Steel Sec 40 Dia 6 " Hyder + Drain 1.00 - 1.00
- Pipa Black Steel Sec 40 Dia 6 " 15.00 (15.00) -
- Pipa Black Steel Sec 40 Dia 4 " 41.00 20.00 61.00
- Pipa Black Steel Sec 40 Dia 3 " 25.00 - 25.00
- Pipa Black Steel Sec 40 Dia 2,5 " 6.00 - 6.00

326 - Instalasi Pemipaan Hydrant dalam tanah menggunakan


VOLUME
NO. URAIAN PEKERJAAN
TAMBAH/
CCO MC100
KURANG
1 2 3 4 5=3+4
pipa Black Steel Sch 40 ASTM A 53 - 90 b, ex RISER,
BAKRI, PPI Lengkap terpasang termasung galian, hanger
Support dan fitting - fittingnya terpasang lengkap
Pemasangan di dalam tanah harus di cat dengan cat / coating
anti karat / korosi
- Pipa Black Steel Sec 40 Dia 4 " 40.00 10.00 50.00

327 Kelengkapan, Valve - valve, ex TOYO, Hanywell & Weflo


2. Gate Valve dia 4" 6.00 - 6.00
3. Gate Valve dia 2" 4.00 - 4.00
4. Air Fan , Presure Gauge, Gate Valve 3 set 1.00 - 1.00
5. Float Klep dia 4" 2.00 - 2.00
7. Presure Tank Kap 500 Lt, tekanan kerja 12 kg/m2, 1.00 - 1.00
Standard Depnaker -
8. Panel Power Hydrant lengkap dan control otomatic 1.00 - 1.00
9. Power kabel pompa dan Daya Pompa 1.00 - 1.00
11. Check Valve dia 4" 2.00 - 2.00
13. Flexible Pipe dia 4", 16 K 2.00 - 2.00
15. Strainer Pipe dia 4", 16 K 2.00 - 2.00

Rumah Pompa Hydrant dan Pompa Air Bersih


328 1. Ground Tank Kapasitas 75 m3 2.00 - 2.00
329 2. Equipped With Cable pump dan Electroda Massa Wate 1.00 - 1.00
Level Control ( WLC ) ke RoofTank
330 3 Equipped with cables pump dan Electroda Water Level 1.00 - 1.00
Control ( WLC ) ke Ground Tank
Bak Septick Tank dan Resapan
331 4. Septick Tank ukuran 12 m3 2.00 - 2.00
332 5. Resapan Septick Tank ukuran 1 m3 2.00 - 2.00
333 4. Bak Resapan Air Bekas / Air Hujan 3 m3 2.00 - 2.00

- Instalasi Pemipaan Hydrant di dalam gedung menggu -


nakan pipa Black Steel Sch 40 ASTM A 53 - 90 b, ex RISER,
BAKRI, PPI Lengkap terpasang termasung galian, hanger
Support dan fitting - fittingnya terpasang lengkap
Lantai - Basemen
334 - Pipa Black Steel Sec 40 Dia 4 " 20.00 35.00 55.00
- Pipa Black Steel Sec 40 Dia 3 " 30.00 (15.00) 15.00
- Pipa Black Steel Sec 40 Dia 2,5 " 10.00 10.00 20.00
335 Box Hydrant Indoor Include Hoarek, Hose 1 1/2 " 2.00 - 2.00
30 mtr, Nozel, Gate Valve + Lending Valve 2 1/2 "
Lantai - 1
336 - Pipa Black Steel Sec 40 Dia 4 " 20.00 (10.00) 10.00
- Pipa Black Steel Sec 40 Dia 3 " 30.00 20.00 50.00
- Pipa Black Steel Sec 40 Dia 2,5 " 10.00 30.00 40.00
337 Box Hydrant Indoor Include Hoarek, Hose 1 1/2 " 2.00 - 2.00
30 mtr, Nozel, Gate Valve + Lending Valve 2 1/2 "
Lantai - 2
338 - Pipa Black Steel Sec 40 Dia 4 " 20.00 (10.00) 10.00
- Pipa Black Steel Sec 40 Dia 3 " 30.00 20.00 50.00
- Pipa Black Steel Sec 40 Dia 2,5 " 10.00 30.00 40.00
339 Box Hydrant Indoor Include Hoarek, Hose 1 1/2 " 2.00 - 2.00
30 mtr, Nozel, Gate Valve + Lending Valve 2 1/2 "
VOLUME
NO. URAIAN PEKERJAAN
TAMBAH/
CCO MC100
KURANG
1 2 3 4 5=3+4
Lantai - 3
340 - Pipa Black Steel Sec 40 Dia 4 " 30.00 (20.00) 10.00
- Pipa Black Steel Sec 40 Dia 3 " 40.00 20.00 60.00
- Pipa Black Steel Sec 40 Dia 2,5 " 15.00 25.00 40.00
341 Box Hydrant Indoor Include Hoarek, Hose 1 1/2 " 3.00 - 3.00
30 mtr, Nozel, Gate Valve + Lending Valve 2 1/2 "

R PEKERJAAN PLUMBING
AIR BERSIH
Pemipaan distribusi air bersih dari Roof Tank ke semua
outlet kran - kran, and bypasnya Pekerjaan Pemipaan
Air Bersih Bahan pipa PVC WAVIN AW lengkap terpasang
dengan gantungan, hanger, Support, Fitting dan
Asesorisnya, Pipa, PVC WAVIN AW , Valve - Valve
TOYO, KITZ , Honywell & Weflow

342 Lantai - Basement


- Pipa Suplay dia 1/2 " ( PVC WAVIN AW / MASPION AW 30.00 70.00 100.00
- Pipa Suplay dia 3/4 " ( PVC WAVIN AW / MASPIOIN AW 30.00 75.00 105.00
- Pipa Suplay dia 1 " ( PVC WAVIN AW / MASPION AW 30.00 10.00 40.00
- Pipa Suplay dia 1 1/2 " ( PVC WAVIN AW / MASPION AW 20.00 10.00 30.00
- Pipa Suplay dia 2 " ( PVC WAVIN AW / MASPION AW 20.00 (20.00) -
- Kran bak Toilet 1/2 " 125 PSI 4.00 9.00 13.00
- Gate Valve 1 " 125 PSI 2.00 - 2.00
- Gate Valve 1 1/2 " 125 PSI 2.00 - 2.00
- Gate Valve 2 " 125 PSI 2.00 (2.00) -
- Balancing Valve 2 " 125 PSI 2.00 (2.00) -

343 Lantai - 1
- Pipa Suplay dia 1/2 " ( PVC WAVIN AW / MASPION AW 60.00 65.00 125.00
- Pipa Suplay dia 3/4 " ( PVC WAVIN AW / MASPIOIN AW 50.00 - 50.00
- Pipa Suplay dia 1 " ( PVC WAVIN AW / MASPION AW 30.00 - 30.00
- Pipa Suplay dia 1 1/2 " ( PVC WAVIN AW / MASPION AW 30.00 - 30.00
- Pipa Suplay dia 2 " ( PVC WAVIN AW / MASPION AW 15.00 (15.00) -
- Kran bak Toilet 1/2 " 125 PSI 8.00 5.00 13.00
- Gate Valve 1 " 125 PSI 2.00 - 2.00
- Gate Valve 1 1/2 " 125 PSI 2.00 - 2.00
- Gate Valve 2 " 125 PSI 2.00 (2.00) -
- Balancing Valve 2 " 125 PSI 2.00 (2.00) -

344 Lantai - 2
- Pipa Suplay dia 1/2 " ( PVC WAVIN AW / MASPION AW 60.00 36.00 96.00
- Pipa Suplay dia 3/4 " ( PVC WAVIN AW / MASPIN AW 50.00 65.00 115.00
- Pipa Suplay dia 1 " ( PVC WAVIN AW / MASPION AW 30.00 - 30.00
- Pipa Suplay dia 1 1/2 " ( PVC WAVIN AW / MASPION AW 30.00 - 30.00
- Pipa Suplay dia 2 " ( PVC WAVIN AW / MASPION AW 15.00 (15.00) -
- Kran bak Toilet 1/2 " 125 PSI 4.00 4.00 8.00
- Gate Valve 1 " 125 PSI 2.00 - 2.00
- Gate Valve 1 1/2 " 125 PSI 2.00 - 2.00
- Gate Valve 2 " 125 PSI 2.00 (2.00) -
- Balancing Valve 2 " 125 PSI 2.00 (2.00) -
VOLUME
NO. URAIAN PEKERJAAN
TAMBAH/
CCO MC100
KURANG
1 2 3 4 5=3+4

345 Lantai - 3
- Pipa Suplay dia 1/2 " ( PVC WAVIN AW / MASPION AW 60.00 65.00 125.00
- Pipa Suplay dia 3/4 " ( PVC WAVIN AW / MASPIN AW 50.00 130.00 180.00
- Pipa Suplay dia 1 " ( PVC WAVIN AW / MASPION AW 30.00 - 30.00
- Pipa Suplay dia 1 1/2 " ( PVC WAVIN AW / MASPION AW 30.00 - 30.00
- Pipa Suplay dia 2 " ( PVC WAVIN AW / MASPION AW 15.00 (15.00) -
- Kran bak Toilet 1/2 " 125 PSI 8.00 4.00 12.00
- Gate Valve 1 " 125 PSI 2.00 - 2.00
- Gate Valve 1 1/2 " 125 PSI 2.00 - 2.00
- Gate Valve 2 " 125 PSI 2.00 (2.00) -
- Balancing Valve 2 " 125 PSI 2.00 (2.00) -

S Instalas pipa air bersih untuk penyiraman diluar / taman


346 Pipa Suplay dia 3/4 " PVC AW 80.00 150.00 230.00
347 Pipa Suplay dia 1/2 " GIP Medium A 8.00 12.00 20.00
348 Fitting ( elbow, reducer, knie, dll ) 1.00 - 1.00
349 Material bantu 1.00 - 1.00
350 Gate valve 3/4" 2.00 - 2.00
351 Kran Taman dia 1/2 " 4.00 2.00 6.00

INSTALASI AIR BEKAS , AIR KOTOR dan AIR HUJAN


T AIR BEKAS ( FOOR DRAIN , WASHTAFEL , URINOIR )
Pekerjaan Air Buangan / Air Bekas, Rucika, Prolon
Pengadaan dan pemasangan pemipaan air bekas bahan
PVC - AW klas 10 K terpasang lengkap dengan gantungan,
galian/urugan, lengkap dengan fitting - fiting dan
asesoriesnya
352 Lantai - Basement
- Dia meter 2" ( dari Washtafel / Urinoir ) 20.00 - 20.00
- Dia meter 2 1/2 " ( dari Wastafel / Urinoir ) 20.00 35.00 55.00
- Dia meter 3" 40.00 40.00 80.00
- Dia meter 4" 60.00 - 60.00
- Dia meter 5" 20.00 (20.00) -
- Floor Drain Stainless 13.00 - 13.00
353 Lantai - 1
- Dia meter 2" ( dari Washtafel / Urinoir ) 20.00 25.00 45.00
- Dia meter 2 1/2 " ( dari Wastafel / Urinoir ) 20.00 30.00 50.00
- Dia meter 3" 40.00 20.00 60.00
- Dia meter 4" 60.00 15.00 75.00
- Dia meter 5" 15.00 (15.00) -
- Floor Drain Stainless 9.00 2.00 11.00
354 Lantai - 2
- Dia meter 2" ( dari Washtafel / Urinoir ) 20.00 10.00 30.00
- Dia meter 2 1/2 " ( dari Washtafel / Urinoir ) 22.00 18.00 40.00
- Dia meter 3" 50.00 (15.00) 35.00
- Dia meter 4" 60.00 (20.00) 40.00
- Dia meter 5" 10.00 (10.00) -
- Floor Drain Stainless 6.00 1.00 7.00
355 Lantai - 3
- Dia meter 2" ( dari Washtafel / Urinoir ) 20.00 50.00 70.00
- Dia meter 2 1/2 " ( dari Washtafel / Urinoir ) 23.00 30.00 53.00
- Dia meter 3" 50.00 30.00 80.00
VOLUME
NO. URAIAN PEKERJAAN
TAMBAH/
CCO MC100
KURANG
1 2 3 4 5=3+4
- Dia meter 4" 60.00 20.00 80.00
- Dia meter 5" 10.00 (10.00) -
- Floor Drain Stainless 11.00 - 11.00

U AIR KOTOR ( BUANGAN DARI TOILET )


356 Lantai 1 , 2 , 3
- Dia meter 3" 60.00 - 60.00
- Dia meter 4" 80.00 - 80.00
- Dia meter 5" 30.00 (30.00) -
- CO ( Cline Out ) 12.00 2.00 14.00

V Air Hujan
- Dia meter 3" - 35.00 35.00
- Dia meter 4" 50.00 150.00 200.00
- Dia meter 5" 40.00 30.00 70.00
- Saringan Air Hujan ( plate 4" ) 12.00 20.00 32.00

W Pipa Vent ( Total untuk 3 Lantai seluruh gedung )


Pekerjaan Pipa Vent ( udara )
Pekerjaan Pipa Vent ( udara ) bahan pipa PVC -
5 K terpasang lengkap dengan gantungan, lengkap
fitting - fitting dan asesoriesnya
- Dia meter 1 1/2 " 20.00 - 20.00
- Dia meter 2 " 20.00 - 20.00
- Dia meter 2 " otomatic 8.00 (4.00) 4.00
KANTOR DPRD LOMBOK TIMUR

JUMLAH HARGA
SAT. HRG. SATUAN
TAMBAH/
KONTRAK ADD I
KURANG
6 7 8 9 10 = 8 + 9

VA 1,680.00 330,960,000.00 (22,176,000.00) 308,784,000.00

set 545,800,000.00 545,800,000.00 - 545,800,000.00

set - Include Genset


-
set 30,000,000.00 30,000,000.00 - 30,000,000.00
-
lot 20,000,000.00 20,000,000.00 - 20,000,000.00
-
m2 265,000.00 55,650,000.00 (3,710,000.00) 51,940,000.00

set 104,000,000.00 104,000,000.00 - 104,000,000.00


set 85,000,000.00 85,000,000.00 - 85,000,000.00
mt 2,850,000.00 34,200,000.00 - 34,200,000.00
-
mt 2,850,000.00 34,200,000.00 - 34,200,000.00
-
set 116,800,000.00 116,800,000.00 - 116,800,000.00
mt 3,300,000.00 19,800,000.00 - 19,800,000.00

Total 1,045,450,000.00 (3,710,000.00) 1,041,740,000.00

mt 100,000.00 2,500,000.00 - 2,500,000.00


- -
mt 300,000.00 4,500,000.00 6,000,000.00 10,500,000.00
- -
mt 350,000.00 7,000,000.00 7,000,000.00 14,000,000.00
JUMLAH HARGA
SAT. HRG. SATUAN
TAMBAH/
KONTRAK ADD I
KURANG
6 7 8 9 10 = 8 + 9
- -
mt 300,000.00 9,000,000.00 4,500,000.00 13,500,000.00
- -
mt 278,500.00 11,140,000.00 5,570,000.00 16,710,000.00
- -
mt 230,000.00 10,350,000.00 6,900,000.00 17,250,000.00
- -
mt 82,000.00 820,000.00 - 820,000.00
- -
mt 96,500.00 6,755,000.00 1,930,000.00 8,685,000.00
- -
mt 80,000.00 240,000.00 160,000.00 400,000.00
- -
mt 50,000.00 500,000.00 500,000.00 1,000,000.00
-
-
-
mt 100,000.00 1,000,000.00 (500,000.00) 500,000.00
-
mt 174,500.00 1,745,000.00 (872,500.00) 872,500.00
-
-
mt 100,000.00 1,000,000.00 (500,000.00) 500,000.00
-
mt 230,000.00 2,300,000.00 (1,150,000.00) 1,150,000.00
- -
- -
mt 100,000.00 1,000,000.00 (500,000.00) 500,000.00
-
mt 174,500.00 1,745,000.00 (872,500.00) 872,500.00
-
-
mt 34,000.00 340,000.00 (170,000.00) 170,000.00
- -
mt 174,500.00 1,745,000.00 (872,500.00) 872,500.00
- -
mt 86,000.00 860,000.00 860,000.00 1,720,000.00
-
-
-
set 11,538,700.00 11,538,700.00 - 11,538,700.00
set 14,251,500.00 14,251,500.00 - 14,251,500.00
set 7,385,500.00 7,385,500.00 - 7,385,500.00
set 9,315,500.00 9,315,500.00 - 9,315,500.00
set 16,585,500.00 16,585,500.00 - 16,585,500.00
set 6,655,500.00 6,655,500.00 - 6,655,500.00
set 11,185,500.00 11,185,500.00 - 11,185,500.00
set 14,735,500.00 14,735,500.00 - 14,735,500.00
set 6,655,500.00 6,655,500.00 - 6,655,500.00
set 9,585,500.00 9,585,500.00 - 9,585,500.00
set 13,585,500.00 13,585,500.00 - 13,585,500.00
set 5,865,500.00 5,865,500.00 5,865,500.00 11,731,000.00
set 9,315,500.00 9,315,500.00 - 9,315,500.00
set 13,435,500.00 13,435,500.00 - 13,435,500.00
set 3,995,500.00 3,995,500.00 - 3,995,500.00
JUMLAH HARGA
SAT. HRG. SATUAN
TAMBAH/
KONTRAK ADD I
KURANG
6 7 8 9 10 = 8 + 9
set 6,025,500.00 6,025,500.00 - 6,025,500.00
set 5,195,500.00 5,195,500.00 - 5,195,500.00
Total 229,852,700.00 33,848,000.00 263,700,700.00

mtr 115,300.00 24,213,000.00 6,341,500.00 30,554,500.00

set 600,000,000.00 1,200,000,000.00 - 1,200,000,000.00

unit 5,299,760.00 26,498,800.00 - 26,498,800.00

unit 5,299,760.00 121,894,480.00 (26,498,800.00) 95,395,680.00

unit 21,902,290.00 109,511,450.00 - 109,511,450.00

unit 5,299,760.00 196,091,120.00 (5,299,760.00) 190,791,360.00

unit 5,299,760.00 68,896,880.00 - 68,896,880.00

unit 8,299,760.00 24,899,280.00 - 24,899,280.00

unit 21,902,290.00 43,804,580.00 - 43,804,580.00

unit 5,299,760.00 5,299,760.00 - 5,299,760.00

unit 27,902,290.00 167,413,740.00 - 167,413,740.00

unit 450,000.00 - 32,850,000.00 32,850,000.00

bh 400,000.00 4,000,000.00 - 4,000,000.00

bh 400,000.00 5,600,000.00 400,000.00 6,000,000.00


JUMLAH HARGA
SAT. HRG. SATUAN
TAMBAH/
KONTRAK ADD I
KURANG
6 7 8 9 10 = 8 + 9

bh 400,000.00 2,800,000.00 - 2,800,000.00

bh 400,000.00 5,200,000.00 - 5,200,000.00

bh 400,000.00 2,000,000.00 - 2,000,000.00


Total 783,910,090.00 1,451,440.00 785,361,530.00

unit 10,310,000.00 20,620,000.00 - 20,620,000.00

unit 4,000,000.00 4,000,000.00 (4,000,000.00) -


ls 5,500,000.00 5,500,000.00 - 5,500,000.00

mt 55,000.00 1,375,000.00 3,025,000.00 4,400,000.00


mt 72,000.00 1,800,000.00 (1,800,000.00) -
ls 4,500,000.00 4,500,000.00 - 4,500,000.00
-
set 50,000,000.00 50,000,000.00 - 50,000,000.00
-
-
Unit 6,535,000.00 13,070,000.00 - 13,070,000.00
-
-
lot 1,000,000.00 1,000,000.00 - 1,000,000.00

Total 101,865,000.00 (2,775,000.00) 99,090,000.00

ls 500,000.00 500,000.00 - 500,000.00

mt 364,500.00 27,337,500.00 - 27,337,500.00


mt 256,500.00 2,052,000.00 - 2,052,000.00
bh 1,815,000.00 7,260,000.00 - 7,260,000.00
ls 129,600.00 129,600.00 - 129,600.00
1,140,500.00 1,140,500.00 - 1,140,500.00
ls 10,000,000.00 10,000,000.00 - 10,000,000.00

ls 25,000,000.00 25,000,000.00 - 25,000,000.00


- -
ls 800,000.00 800,000.00 - 800,000.00
- -
ls 2,100,000.00 2,100,000.00 (2,100,000.00) -
JUMLAH HARGA
SAT. HRG. SATUAN
TAMBAH/
KONTRAK ADD I
KURANG
6 7 8 9 10 = 8 + 9
mt 28,500.00 2,850,000.00 - 2,850,000.00
mt 17,500.00 1,750,000.00 - 1,750,000.00
ls 2,350,000.00 2,350,000.00 - 2,350,000.00
- -
mt 160,000.00 12,800,000.00 - 12,800,000.00
mt 73,410.00 734,100.00 - 734,100.00
set 5,000,000.00 5,000,000.00 - 5,000,000.00
Total 101,803,700.00 (2,100,000.00) 99,703,700.00

bh

bh

bh 300,000.00 1,500,000.00 - 1,500,000.00

bh 1,110,000.00

bh 400,000.00 22,400,000.00 - 22,400,000.00

bh 250,000.00 1,000,000.00 - 1,000,000.00

bh 450,000.00 450,000.00 - 450,000.00

bh 34,500.00 552,000.00 - 552,000.00


bh 34,500.00 172,500.00 - 172,500.00
bh 34,500.00 34,500.00 34,500.00 69,000.00
- -
bh 32,000.00 224,000.00 - 224,000.00
bh 40,000.00 640,000.00 - 640,000.00
bh 65,000.00 - -
titik 200,000.00 17,600,000.00 - 17,600,000.00
Total 44,573,000.00 34,500.00 44,607,500.00

set 12,000,000.00 12,000,000.00 - 12,000,000.00


- -
bh 500,000.00 28,500,000.00 - 28,500,000.00
- -
bh 1,400,000.00 7,000,000.00 - 7,000,000.00
- -
bh 250,000.00 22,500,000.00 - 22,500,000.00
- -
bh 1,350,000.00 4,050,000.00 - 4,050,000.00
- -
bh - -
JUMLAH HARGA
SAT. HRG. SATUAN
TAMBAH/
KONTRAK ADD I
KURANG
6 7 8 9 10 = 8 + 9
- -
bh 265,500.00 1,062,000.00 1,062,000.00 2,124,000.00
- -
bh 450,000.00 1,350,000.00 (450,000.00) 900,000.00
- -
- -
- -
bh 125,000.00 375,000.00 - 375,000.00
bh 34,500.00 2,415,000.00 - 2,415,000.00
bh 34,500.00 138,000.00 - 138,000.00
bh 34,500.00 69,000.00 - 69,000.00
- -
bh 32,000.00 416,000.00 32,000.00 448,000.00
bh 40,000.00 1,440,000.00 - 1,440,000.00
bh 65,000.00 130,000.00 (130,000.00) -
titik 200,000.00 48,600,000.00 200,000.00 48,800,000.00
Total 130,045,000.00 714,000.00 130,759,000.00

bh 500,000.00 36,000,000.00 - 36,000,000.00


- -
bh 1,350,000.00 5,400,000.00 - 5,400,000.00
- -
bh 300,000.00 25,200,000.00 - 25,200,000.00
- -
bh 1,350,000.00 8,100,000.00 - 8,100,000.00
- -
bh - -
- -
bh 265,500.00 1,062,000.00 - 1,062,000.00
- -
bh 450,000.00 1,350,000.00 - 1,350,000.00
- -
- -
- -
bh 34,500.00 2,208,000.00 - 2,208,000.00
bh 34,500.00 103,500.00 - 103,500.00
bh 34,500.00 69,000.00 34,500.00 103,500.00
- -
bh 32,000.00 160,000.00 - 160,000.00
bh 40,000.00 1,280,000.00 - 1,280,000.00
bh 65,000.00 130,000.00 (130,000.00) -
titik 200,000.00 48,400,000.00 - 48,400,000.00
Total 129,462,500.00 (95,500.00) 129,367,000.00

bh 492,833.33 24,641,666.50 - 24,641,666.50


- -
bh 1,350,433.33 4,051,299.99 - 4,051,299.99
- -
bh 277,833.33 23,060,166.39 - 23,060,166.39
- -
bh 1,135,433.33 9,083,466.64 - 9,083,466.64
- -
- -
JUMLAH HARGA
SAT. HRG. SATUAN
TAMBAH/
KONTRAK ADD I
KURANG
6 7 8 9 10 = 8 + 9
- -
bh 265,500.00 2,124,000.00 - 2,124,000.00
- -
bh 450,000.00 900,000.00 (450,000.00) 450,000.00
- -
- -
- -
bh 34,500.00 2,070,000.00 - 2,070,000.00
bh 34,500.00 103,500.00 - 103,500.00
bh 34,500.00 69,000.00 - 69,000.00
- -
bh 32,000.00 160,000.00 - 160,000.00
bh 40,000.00 1,160,000.00 - 1,160,000.00
bh 65,000.00 130,000.00 (130,000.00) -
titik 200,000.00 43,800,000.00 - 43,800,000.00
Total 111,353,099.52 (580,000.00) 110,773,099.52

bh 450,000.00 450,000.00 - 450,000.00


- -
bh 1,350,000.00 1,350,000.00 - 1,350,000.00
- -
bh 300,000.00 17,400,000.00 - 17,400,000.00
- -
bh 1,350,000.00 13,500,000.00 - 13,500,000.00
- -
bh - -
- -
bh - -
- -
bh - -
- -
- -
- -
bh 34,500.00 207,000.00 - 207,000.00
bh 34,500.00 - -
bh 34,500.00 - -
- -
bh - - -
bh 40,000.00 400,000.00 - 400,000.00
bh - -
titik 200,000.00 15,200,000.00 - 15,200,000.00
Total 48,507,000.00 - 48,507,000.00

set 13,600,000.00 54,400,000.00 - 54,400,000.00


JUMLAH HARGA
SAT. HRG. SATUAN
TAMBAH/
KONTRAK ADD I
KURANG
6 7 8 9 10 = 8 + 9
set 5,000,000.00 15,000,000.00 5,000,000.00 20,000,000.00
Total 69,400,000.00 5,000,000.00 74,400,000.00

bh 295,000.00 1,770,000.00 - 1,770,000.00

bh 65,000.00 130,000.00 - 130,000.00


bh 42,000.00 42,000.00 - 42,000.00
titik 200,000.00 1,200,000.00 - 1,200,000.00
Total 3,142,000.00 - 3,142,000.00

bh 295,000.00 1,180,000.00 (1,180,000.00) -

bh 65,000.00 195,000.00 (195,000.00) -


bh 42,000.00 42,000.00 (42,000.00) -
titik 200,000.00 1,400,000.00 (1,400,000.00) -
Total 2,817,000.00 (2,817,000.00) -

bh 295,000.00 1,180,000.00 (1,180,000.00) -

bh 65,000.00 130,000.00 (130,000.00) -


bh 42,125.00 42,125.00 (42,125.00) -
titik 209,216.66 1,255,299.96 (1,255,299.96) -
Total 2,607,424.96 (2,607,424.96) -

bh 85,000.00 340,000.00 - 340,000.00


bh 65,000.00 130,000.00 (65,000.00) 65,000.00
bh 32,125.00 32,125.00 32,125.00 64,250.00
titik 209,216.66 1,046,083.30 209,216.66 1,255,299.96
Total 1,548,208.30 176,341.66 1,724,549.96

bh 277,833.33 277,833.33 277,833.33 555,666.66

bh 85,000.00 85,000.00 (85,000.00) -

bh 34,500.00 69,000.00 - 69,000.00


bh 32,000.00 32,000.00 - 32,000.00
titik 200,000.00 800,000.00 - 800,000.00
Total 1,263,833.33 192,833.33 1,456,666.66

bh 300,000.00 300,000.00 300,000.00 600,000.00

bh 85,000.00 85,000.00 (85,000.00) -

bh 34,500.00 69,000.00 - 69,000.00


bh 32,000.00 32,000.00 - 32,000.00
titik 200,000.00 800,000.00 - 800,000.00
JUMLAH HARGA
SAT. HRG. SATUAN
TAMBAH/
KONTRAK ADD I
KURANG
6 7 8 9 10 = 8 + 9
Total 1,286,000.00 215,000.00 1,501,000.00

bh 300,000.00 300,000.00 300,000.00 600,000.00

bh 85,000.00 85,000.00 (85,000.00) -

- -
bh 34,500.00 69,000.00 - 69,000.00
bh 32,000.00 32,000.00 - 32,000.00
titik 200,000.00 800,000.00 - 800,000.00
Total 1,286,000.00 215,000.00 1,501,000.00

unit 15,600,000.00 15,600,000.00 - 15,600,000.00

unit 330,500.00 1,652,500.00 - 1,652,500.00

bh 650,000.00 1,300,000.00 1,300,000.00 2,600,000.00

bh 275,000.00 825,000.00 (275,000.00) 550,000.00

bh 365,500.00 48,246,000.00 365,500.00 48,611,500.00

- -
unit 650,000.00 3,250,000.00 - 3,250,000.00
unit 248,000.00 1,240,000.00 - 1,240,000.00
unit 400,000.00 2,000,000.00 - 2,000,000.00
- -
bh 25,000.00 125,000.00 - 125,000.00
unit 2,000,000.00 2,000,000.00 - 2,000,000.00
titik 208,000.00 27,664,000.00 - 27,664,000.00
- -
set 298,100.00 298,100.00 - 298,100.00
mt 54,000.00 8,640,000.00 - 8,640,000.00
- -
mt 39,000.00 5,460,000.00 - 5,460,000.00
- -
bh 1,500,000.00 15,000,000.00 - 15,000,000.00
- -
ls 1,000,000.00 1,000,000.00 - 1,000,000.00
Total 134,300,600.00 1,390,500.00 135,691,100.00

set 30,000,000.00 30,000,000.00 - 30,000,000.00


JUMLAH HARGA
SAT. HRG. SATUAN
TAMBAH/
KONTRAK ADD I
KURANG
6 7 8 9 10 = 8 + 9

bh 300,000.00 300,000.00 - 300,000.00


bh 300,000.00 300,000.00 - 300,000.00
bh 40,000.00 40,000.00 - 40,000.00
m' 175,000.00 175,000.00 - 175,000.00
m' 175,000.00 1,750,000.00 2,625,000.00 4,375,000.00

set 5,524,200.00 5,524,200.00 - 5,524,200.00


bh 300,000.00 2,400,000.00 - 2,400,000.00
set 6,000,000.00 6,000,000.00 - 6,000,000.00
bh 300,000.00 300,000.00 - 300,000.00
bh 40,000.00 320,000.00 - 320,000.00
ttk 175,000.00 1,400,000.00 - 1,400,000.00
m' 175,000.00 14,000,000.00 (8,750,000.00) 5,250,000.00

bh 300,000.00 5,100,000.00 - 5,100,000.00


bh 300,000.00 300,000.00 - 300,000.00
bh 40,000.00 680,000.00 - 680,000.00
m' 175,000.00 2,975,000.00 - 2,975,000.00
m' 175,000.00 29,750,000.00 (22,750,000.00) 7,000,000.00

bh 300,000.00 2,400,000.00 - 2,400,000.00


bh 300,000.00 300,000.00 - 300,000.00
bh 40,000.00 320,000.00 - 320,000.00
m' 175,000.00 1,400,000.00 - 1,400,000.00
m' 175,000.00 14,000,000.00 (5,250,000.00) 8,750,000.00

bh 300,000.00 300,000.00 - 300,000.00


bh 300,000.00 300,000.00 - 300,000.00
bh 40,000.00 40,000.00 - 40,000.00
m' 175,000.00 175,000.00 - 175,000.00
m' 175,000.00 1,750,000.00 8,750,000.00 10,500,000.00
Total 122,299,200.00 - 25,375,000.00 96,924,200.00

set 9,497,160.00 9,497,160.00 - 9,497,160.00


bh 4,196,160.00 4,196,160.00 - 4,196,160.00
bh 4,419,360.00 4,419,360.00 - 4,419,360.00
bh 3,000,000.00 6,000,000.00 - 6,000,000.00
bh 1,200,000.00 1,200,000.00 - 1,200,000.00
bh 1,200,000.00 1,200,000.00 - 1,200,000.00
bh 1,500,000.00 1,500,000.00 - 1,500,000.00

bh 372,000.00 1,488,000.00 - 1,488,000.00


bh 86,000.00 86,000.00 (86,000.00) -
bh 140,000.00 140,000.00 - 140,000.00
bh
bh 600,000.00 600,000.00 - 600,000.00
ttk 330,000.00 1,320,000.00 - 1,320,000.00
JUMLAH HARGA
SAT. HRG. SATUAN
TAMBAH/
KONTRAK ADD I
KURANG
6 7 8 9 10 = 8 + 9
ttk 250,000.00 250,000.00 - 250,000.00
bh 280,000.00 280,000.00 - 280,000.00
m' 18,000.00 864,000.00 (414,000.00) 450,000.00

bh
bh 87,120.00 784,080.00 - 784,080.00
bh 141,240.00 282,480.00 (282,480.00) -
bh 154,440.00 463,320.00 - 463,320.00
bh 600,000.00 600,000.00 - 600,000.00
ttk - - -
ttk 250,000.00 2,250,000.00 - 2,250,000.00
bh 280,000.00 1,400,000.00 - 1,400,000.00
m' 18,000.00 2,016,000.00 (1,386,000.00) 630,000.00

bh 87,120.00 958,320.00 - 958,320.00


bh 141,240.00 423,720.00 (423,720.00) -
bh 154,440.00 308,880.00 154,440.00 463,320.00
bh 600,000.00 600,000.00 - 600,000.00
ttk 250,000.00 2,750,000.00 - 2,750,000.00
ttk 280,000.00 1,400,000.00 - 1,400,000.00
m 18,000.00 2,304,000.00 (1,494,000.00) 810,000.00

bh 87,120.00 696,960.00 - 696,960.00


bh 141,240.00 423,720.00 (423,720.00) -
bh 154,440.00 308,880.00 154,440.00 463,320.00
bh 600,000.00 600,000.00 - 600,000.00
bh 250,000.00 2,000,000.00 - 2,000,000.00
bh 280,000.00 1,400,000.00 - 1,400,000.00
m 18,000.00 1,872,000.00 (882,000.00) 990,000.00

bh 87,120.00 261,360.00 - 261,360.00


bh 141,240.00 141,240.00 - 141,240.00
bh -
bh 600,000.00 600,000.00 - 600,000.00
bh 257,816.66 773,449.98 - 773,449.98
bh 289,216.66 289,216.66 - 289,216.66
m 19,300.00 617,600.00 636,900.00 1,254,500.00
Total 59,565,906.64 - 4,446,140.00 55,119,766.64

ls 150,000,000.00 150,000,000.00 - 150,000,000.00

unit
unit
unit
unit
unit
JUMLAH HARGA
SAT. HRG. SATUAN
TAMBAH/
KONTRAK ADD I
KURANG
6 7 8 9 10 = 8 + 9
set
set
unit
unit
lot
lot

set 14,000,000.00 56,000,000.00 - 56,000,000.00

bh
bh
bh 2,250,000.00 18,000,000.00 - 18,000,000.00
bh 992,500.00 7,940,000.00 - 7,940,000.00
bh 160,000.00 1,280,000.00 - 1,280,000.00
bh 341,000.00 2,728,000.00 - 2,728,000.00
ttk 300,000.00 2,400,000.00 - 2,400,000.00
ttk 342,600.00 2,740,800.00 - 2,740,800.00
- -
unit 25,000,000.00 25,000,000.00 25,000,000.00 50,000,000.00
- -
unit 13,400,000.00 26,800,000.00 - 26,800,000.00
bh 2,000,000.00 6,000,000.00 - 6,000,000.00
bh 2,125,200.00 6,375,600.00 - 6,375,600.00
bh 2,343,000.00 18,744,000.00 - 18,744,000.00
bh 995,800.00 7,966,400.00 - 7,966,400.00
bh 156,000.00 1,248,000.00 - 1,248,000.00
bh 340,000.00 2,720,000.00 - 2,720,000.00
ttk 300,000.00 4,200,000.00 - 4,200,000.00
ttk 340,000.00 4,760,000.00 - 4,760,000.00
- -
bh 2,050,000.00 8,200,000.00 - 8,200,000.00
bh 2,125,200.00 2,125,200.00 - 2,125,200.00
bh 2,343,792.00 9,375,168.00 - 9,375,168.00
bh 995,800.00 1,991,600.00 - 1,991,600.00
bh 156,000.00 624,000.00 - 624,000.00
bh 340,000.00 1,360,000.00 - 1,360,000.00
ttk 300,000.00 2,700,000.00 - 2,700,000.00
ttk 340,000.00 3,060,000.00 - 3,060,000.00
- -
bh 2,050,000.00 12,300,000.00 - 12,300,000.00
bh 2,125,200.00 - - -
bh 2,343,792.00 2,343,792.00 - 2,343,792.00
bh 995,800.00 1,991,600.00 - 1,991,600.00
bh 156,000.00 156,000.00 - 156,000.00
bh 340,000.00 340,000.00 - 340,000.00
ttk 300,000.00 2,100,000.00 - 2,100,000.00
JUMLAH HARGA
SAT. HRG. SATUAN
TAMBAH/
KONTRAK ADD I
KURANG
6 7 8 9 10 = 8 + 9
ttk 340,000.00 2,380,000.00 - 2,380,000.00
- -
bh 2,000,000.00 4,000,000.00 - 4,000,000.00
bh 2,125,200.00 - 2,125,200.00 2,125,200.00
ttk 300,000.00 600,000.00 300,000.00 900,000.00
ttk 342,000.00 684,000.00 342,000.00 1,026,000.00
Total 195,234,160.00 27,767,200.00 223,001,360.00

bh 700,000.00 700,000.00 - 700,000.00


bh 310,000.00 620,000.00 - 620,000.00
ttk 7,500.00 15,000.00 - 15,000.00
m' -
bh 3,200,000.00 3,200,000.00 - 3,200,000.00

bh
bh 5,000,000.00 5,000,000.00 - 5,000,000.00
bh 3,600,000.00 3,600,000.00 - 3,600,000.00
bh - -
bh 3,000,000.00 3,000,000.00 - 3,000,000.00
bh 3,000,000.00 3,000,000.00 - 3,000,000.00
bh 3,500,000.00 3,500,000.00 - 3,500,000.00
bh 4,000,000.00 4,000,000.00 - 4,000,000.00
ls 3,000,000.00 3,000,000.00 - 3,000,000.00
bh 600,000.00 600,000.00 - 600,000.00
bh 1,500,000.00 1,500,000.00 - 1,500,000.00
bh 3,200,000.00 3,200,000.00 - 3,200,000.00
bh 700,000.00 700,000.00 - 700,000.00
bh 310,000.00 620,000.00 - 620,000.00
ttk 7,500.00 15,000.00 - 15,000.00
m' -

bh 700,000.00 700,000.00 - 700,000.00


bh 310,000.00 930,000.00 - 930,000.00
ttk 7,500.00 22,500.00 - 22,500.00
m'
bh 3,200,000.00 3,200,000.00 - 3,200,000.00
- -
bh 700,000.00 700,000.00 - 700,000.00
bh 310,000.00 620,000.00 - 620,000.00
ttk 7,500.00 15,000.00 - 15,000.00
m' - - - -
bh 3,200,000.00 3,200,000.00 - 3,200,000.00
Total 45,657,500.00 - 45,657,500.00

set 9,500,000.00 19,000,000.00 - 19,000,000.00

mt 85,000.00 17,850,000.00 - 17,850,000.00

ttk 1,000,000.00 3,000,000.00 (1,000,000.00) 2,000,000.00


JUMLAH HARGA
SAT. HRG. SATUAN
TAMBAH/
KONTRAK ADD I
KURANG
6 7 8 9 10 = 8 + 9

set 500,000.00 1,500,000.00 (500,000.00) 1,000,000.00


ls 500,000.00 500,000.00 - 500,000.00
ls 500,000.00 500,000.00 - 500,000.00
Total 42,350,000.00 (1,500,000.00) 40,850,000.00

set 268,500,000.00 268,500,000.00 - 268,500,000.00

set 158,500,000.00 158,500,000.00 - 158,500,000.00

set 26,500,000.00 26,500,000.00 - 26,500,000.00

set 3,850,000.00 7,700,000.00 - 7,700,000.00

set 3,225,000.00 6,450,000.00 - 6,450,000.00

set 3,140,000.00 12,560,000.00 (6,280,000.00) 6,280,000.00

set 560,000.00 1,120,000.00 - 1,120,000.00


set 840,000.00 1,680,000.00 - 1,680,000.00
unit 6,550,000.00 6,550,000.00 19,650,000.00 26,200,000.00

set 11,850,000.00 11,850,000.00 - 11,850,000.00


mt 385,000.00 5,775,000.00 (5,775,000.00) -
mt 360,000.00 14,760,000.00 7,200,000.00 21,960,000.00
mt 275,000.00 6,875,000.00 - 6,875,000.00
mt 195,000.00 1,170,000.00 - 1,170,000.00
JUMLAH HARGA
SAT. HRG. SATUAN
TAMBAH/
KONTRAK ADD I
KURANG
6 7 8 9 10 = 8 + 9

mt 365,000.00 14,600,000.00 3,650,000.00 18,250,000.00

bh 4,750,000.00 28,500,000.00 - 28,500,000.00


bh 1,465,000.00 5,860,000.00 - 5,860,000.00
set 2,000,000.00 2,000,000.00 - 2,000,000.00
set 2,760,000.00 5,520,000.00 - 5,520,000.00
set 33,264,000.00 33,264,000.00 - 33,264,000.00

set 57,600,000.00 57,600,000.00 - 57,600,000.00


set 55,000,000.00 55,000,000.00 - 55,000,000.00
set 2,500,000.00 5,000,000.00 - 5,000,000.00
set 950,000.00 1,900,000.00 - 1,900,000.00
set 2,500,000.00 5,000,000.00 - 5,000,000.00
Total 744,234,000.00 18,445,000.00 762,679,000.00

set 112,600,000.00 225,200,000.00 - 225,200,000.00


set 840,000.00 840,000.00 - 840,000.00

set 840,000.00 840,000.00 - 840,000.00


Total 226,880,000.00 - 226,880,000.00

set 24,000,000.00 48,000,000.00 - 48,000,000.00


set 1,280,000.00 2,560,000.00 - 2,560,000.00
set 6,000,000.00 12,000,000.00 - 12,000,000.00
Total 62,560,000.00 - 62,560,000.00

mt 364,200.00 7,284,000.00 12,747,000.00 20,031,000.00


mt 274,800.00 8,244,000.00 (4,122,000.00) 4,122,000.00
mt 192,400.00 1,924,000.00 1,924,000.00 3,848,000.00
set 3,150,000.00 6,300,000.00 - 6,300,000.00

mt 364,200.00 7,284,000.00 (3,642,000.00) 3,642,000.00


mt 274,800.00 8,244,000.00 5,496,000.00 13,740,000.00
mt 192,400.00 1,924,000.00 5,772,000.00 7,696,000.00
set 3,150,000.00 6,300,000.00 - 6,300,000.00

mt 364,200.00 7,284,000.00 (3,642,000.00) 3,642,000.00


mt 274,800.00 8,244,000.00 5,496,000.00 13,740,000.00
mt 192,400.00 1,924,000.00 5,772,000.00 7,696,000.00
set 3,150,000.00 6,300,000.00 - 6,300,000.00
JUMLAH HARGA
SAT. HRG. SATUAN
TAMBAH/
KONTRAK ADD I
KURANG
6 7 8 9 10 = 8 + 9

mt 364,200.00 10,926,000.00 (7,284,000.00) 3,642,000.00


mt 274,800.00 10,992,000.00 5,496,000.00 16,488,000.00
mt 192,400.00 2,886,000.00 4,810,000.00 7,696,000.00
set 3,150,000.00 9,450,000.00 - 9,450,000.00
Total 105,510,000.00 28,823,000.00 134,333,000.00

mt 17,200.00 516,000.00 1,204,000.00 1,720,000.00


mt 24,100.00 723,000.00 1,807,500.00 2,530,500.00
mt 32,800.00 984,000.00 328,000.00 1,312,000.00
mt 52,400.00 1,048,000.00 524,000.00 1,572,000.00
mt 70,000.00 1,400,000.00 (1,400,000.00) -
ls 143,000.00 572,000.00 1,287,000.00 1,859,000.00
ls 208,000.00 416,000.00 - 416,000.00
ls 322,000.00 644,000.00 - 644,000.00
ls 484,700.00 969,400.00 (969,400.00) -
ls 1,987,000.00 3,974,000.00 (3,974,000.00) -
Total 11,246,400.00 (1,192,900.00) 10,053,500.00

mt 17,200.00 1,032,000.00 1,118,000.00 2,150,000.00


mt 24,100.00 1,205,000.00 - 1,205,000.00
mt 32,800.00 984,000.00 - 984,000.00
mt 52,400.00 1,572,000.00 - 1,572,000.00
mt 70,000.00 1,050,000.00 (1,050,000.00) -
ls 143,000.00 1,144,000.00 715,000.00 1,859,000.00
ls 208,000.00 416,000.00 - 416,000.00
ls 322,000.00 644,000.00 - 644,000.00
ls 484,700.00 969,400.00 (969,400.00) -
ls 1,987,000.00 3,974,000.00 (3,974,000.00) -
Total 12,990,400.00 (4,160,400.00) 8,830,000.00

mt 17,200.00 1,032,000.00 619,200.00 1,651,200.00


mt 24,100.00 1,205,000.00 1,566,500.00 2,771,500.00
mt 32,800.00 984,000.00 - 984,000.00
mt 52,400.00 1,572,000.00 - 1,572,000.00
mt 70,000.00 1,050,000.00 (1,050,000.00) -
ls 143,000.00 572,000.00 572,000.00 1,144,000.00
ls 208,000.00 416,000.00 - 416,000.00
ls 322,000.00 644,000.00 - 644,000.00
ls 484,700.00 969,400.00 (969,400.00) -
ls 1,987,000.00 3,974,000.00 (3,974,000.00) -
Total 12,418,400.00 (3,235,700.00) 9,182,700.00
JUMLAH HARGA
SAT. HRG. SATUAN
TAMBAH/
KONTRAK ADD I
KURANG
6 7 8 9 10 = 8 + 9

mt 17,200.00 1,032,000.00 1,118,000.00 2,150,000.00


mt 24,100.00 1,205,000.00 3,133,000.00 4,338,000.00
mt 32,800.00 984,000.00 - 984,000.00
mt 52,400.00 1,572,000.00 - 1,572,000.00
mt 70,000.00 1,050,000.00 (1,050,000.00) -
ls 143,000.00 1,144,000.00 572,000.00 1,716,000.00
ls 208,000.00 416,000.00 - 416,000.00
ls 322,000.00 644,000.00 - 644,000.00
ls 484,700.00 969,400.00 (969,400.00) -
ls 1,987,000.00 3,974,000.00 (3,974,000.00) -
Total 12,990,400.00 (1,170,400.00) 11,820,000.00

mt 33,219.00 2,657,520.00 4,982,850.00 7,640,370.00


mt 65,000.00 520,000.00 780,000.00 1,300,000.00
ls 1,000,000.00 1,000,000.00 - 1,000,000.00
ls 1,000,000.00 1,000,000.00 - 1,000,000.00
bh 185,500.00 371,000.00 - 371,000.00
bh 143,000.00 572,000.00 286,000.00 858,000.00
Total 6,120,520.00 6,048,850.00 12,169,370.00

mt 70,000.00 1,400,000.00 - 1,400,000.00


mt 98,200.00 1,964,000.00 3,437,000.00 5,401,000.00
mt 142,500.00 5,700,000.00 5,700,000.00 11,400,000.00
mt 230,000.00 13,800,000.00 - 13,800,000.00
mt 355,000.00 7,100,000.00 (7,100,000.00) -
bh 230,000.00 2,990,000.00 - 2,990,000.00

mt 70,000.00 1,400,000.00 1,750,000.00 3,150,000.00


mt 98,200.00 1,964,000.00 2,946,000.00 4,910,000.00
mt 142,500.00 5,700,000.00 2,850,000.00 8,550,000.00
mt 230,000.00 13,800,000.00 3,450,000.00 17,250,000.00
mt 355,000.00 5,325,000.00 (5,325,000.00) -
bh 230,000.00 2,070,000.00 460,000.00 2,530,000.00

mt 70,000.00 1,400,000.00 700,000.00 2,100,000.00


mt 98,200.00 2,160,400.00 1,767,600.00 3,928,000.00
mt 142,500.00 7,125,000.00 (2,137,500.00) 4,987,500.00
mt 230,000.00 13,800,000.00 (4,600,000.00) 9,200,000.00
mt 355,000.00 3,550,000.00 (3,550,000.00) -
bh 230,000.00 1,380,000.00 230,000.00 1,610,000.00

mt 70,000.00 1,400,000.00 3,500,000.00 4,900,000.00


mt 98,200.00 2,258,600.00 2,946,000.00 5,204,600.00
mt 142,500.00 7,125,000.00 4,275,000.00 11,400,000.00
JUMLAH HARGA
SAT. HRG. SATUAN
TAMBAH/
KONTRAK ADD I
KURANG
6 7 8 9 10 = 8 + 9
mt 230,000.00 13,800,000.00 4,600,000.00 18,400,000.00
mt 355,000.00 3,550,000.00 (3,550,000.00) -
bh 230,000.00 2,530,000.00 - 2,530,000.00
Total 123,292,000.00 12,349,100.00 135,641,100.00

mt 142,500.00 8,550,000.00 - 8,550,000.00


mt 230,000.00 18,400,000.00 - 18,400,000.00
mt 355,000.00 10,650,000.00 (10,650,000.00) -
set 260,000.00 3,120,000.00 520,000.00 3,640,000.00

mt 52,500.00 - 1,837,500.00 1,837,500.00


mt 230,000.00 11,500,000.00 34,500,000.00 46,000,000.00
mt 355,000.00 14,200,000.00 10,650,000.00 24,850,000.00
set 38,000.00 456,000.00 760,000.00 1,216,000.00

mt 52,400.00 1,048,000.00 - 1,048,000.00


mt 70,000.00 1,400,000.00 - 1,400,000.00
bh 42,000.00 336,000.00 (168,000.00) 168,000.00
Total 69,660,000.00 37,449,500.00 107,109,500.00

Total I 6,558,655,042.75 102,520,300.03 6,661,175,342.78


RENCANA ANGGARAN BIAYA
(RAB)
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR DPRD KABUPATEN LOMB
LOKASI : JALAN LALU MUCHDAR NO. 1 SELONG
TAHUN ANGGARAN : 2016

VOLUME
NO. URAIAN PEKERJAAN
KONTRAK CCO
1 2 3 4

A. PEKERJAAN LANTAI DASAR (BASEMANT)

V. PEKERJAAN BETON
45 Pek. Balok latei = 13x15 cm area kanopi sisi timur dan bar 0.000 0.702
46 Overstek besi yang masuk ke pondasi 0.000 2,261.028

VII. PEKERJAAN PENGUNCI DAN PENGGANTUNG


1a Pek. Handle Pintu 0.000 10.000

B. PEKERJAAN LANTAI 1 (SATU)


I. PEKERJAAN PASANGAN DAN PLESTERAN
5a Pek. Plesteran Balok Beton, Camp.1PC:5PS 0.000 285.945

V. PEKERJAAN BETON
32 Pek. Ring balok dudukan jendela J6 0.000 2.065
33 Overstek besi balok lantai 1 0.000 2,097.866

VII. PEKERJAAN PENGUNCI DAN PENGGANTUNG


1a Pek. Handle Pintu 0.000 10.000

C. PEKERJAAN LANTAI 2 (DUA)


I. PEKERJAAN PASANGAN DAN PLESTERAN
7 Pek. Kolom Beton K.8 = 30x30cm, K.250 0.000 1.566
5a Pek. Plesteran Balok Beton, Camp.1PC:5PS 0.000 182.380

III. PEKERJAAN BETON


28 Pek. Balok latei = 13x15 cm (GRC) 0.000 2.145
29 Overstek besi balok lantai 2 0.000 2,176.281

V. PEKERJAAN PENGUNCI DAN PENGGANTUNG


1a Pek. Handle Pintu 0.000 7.000
D. PEKERJAAN LANTAI 3 (TIGA)
I. PEKERJAAN PASANGAN DAN PLESTERAN
5 Pek. Kolom Beton K.8 = 30x30cm, K.250 0.000 1.566
5a Pek. Plesteran Balok Beton, Camp.1PC:5PS 0.000 187.835

III. PEKERJAAN BETON


25 Pek. Balok latei = 13x15 cm el. + 12.05 0.000 1.096
25 Pek. Balok latei = 13x15 cm dibawah kusen J5 0.000 0.421
26 Overstek besi balok lantai 3 0.000 2,102.016

V. PEKERJAAN PENGUNCI DAN PENGGANTUNG


1a Pek. Handle Pintu 0.000 10.000

E. PEKERJAAN LANTAI 4 (EMPAT)


I. PEKERJAAN PASANGAN DAN PLESTERAN
3a Pek. Plesteran Balok Beton, Camp.1PC:5PS 0.000 296.955

II PEKERJAAN LANTAI
4 Pek. Rangka Plafond Besi Hollow 0.000 932.307
5 Pek. Plafond Gypsumboard t=9mm 0.000 932.307
6 Pek. List Plafond Gypsum 10cm 0.000 826.121

III. PEKERJAAN BETON


4 Pek. Kolom Beton Praktis KP.1 =13x13cm, K.250 0.000 0.507
4 Pek. Kolom Beton K.8 = 30x30cm, K.250 0.000 1.080
5 Pek. Ring Balok Beton R.1 = 35x50cm, K.250 0.000 35.893
6 Pek. Balok Beton B.21 = 20x35cm, K.250 0.000 2.058
7 Pek. Balok latei = 13x15 cm el. + 12.05 0.000 1.098
8 Overstek besi balok lantai 4 0.000 1,022.825

IV. PEKERJAAN KAYU


4 Pek. Daun Pintu Panil + Kaca 5mm, Klas II - 2.173

V. PEKERJAAN PENGUNCI DAN PENGGANTUNG


1a Pek. Handle Pintu 0.000 4.000

VI. PEKERJAAN KONSTRUKSI ATAP


15a Pek. Pengecatan baja 0.000 1,653.952

J. PEKERJAAN SARANA DAN PRASARANA LUAR


I. AREA JALAN DAN PARKIR LUAR BANGUNAN
6 Pek. Pas. Pondasi Batu Kali, Camp.1PC:5PS (ramp depan) 0.000 49.851
7 Pek. Pas. Dinding Bata 1/2Bt (taman) 0.000 358.608
8 Pek. Plesteran Dinding Bata, Camp.1PC:5PS 0.000 358.608
9 Pek. Acian 0.000 358.608
10 Pek. Cat Dinding Tembok 0.000 358.608
K. PEKERJAAN TAMBAHAN
1 Waterprofing Lantai 1 0.000 53.440
Waterprofing Lantai 2 0.000 43.965
Waterprofing Lantai 3 0.000 43.965
Waterprofing Lantai 4 0.000 694.243

2 Gypsum board diatas partisi lantai 1 0.000 58.136

2 Screeding Lantai 1 0.000 53.440


Screeding Lantai 2 0.000 43.965
Screeding Lantai 3 0.000 43.965

Screeding Lantai 4 0.000 694.243

3 Granite Garda Pintu Lift Lantai Basement 0.000 17.250


Granite Garda Pintu Lift Lantai 1 0.000 17.800
Granite Garda Pintu Lift Lantai 2 0.000 18.625
Granite Garda Pintu Lift Lantai 3 0.000 18.625

4 Pembongkaran Pagar Existing 0.000 110.260

5 Plat Jembatan 0.000 7.685

6 Pintu besi di ruang pompa (pintu double) 0.000 1.000

7 Pintu besi di ruang lift 0.000 1.000

8 PEKERJAAN SANITARY
a Lantai Basement
Closet Duduk Monoblok + Jet Washer 0.000 4.000
Wastafel Upper Counter 0.000 4.000
Meja beton wastafel 0.000 0.288
Meja Granite 0.000 6.720
Tempat Sabun Westafel 0.000 4.000
Tempat tissue 0.000 4.000
Kaca Cermin 0.000 4.000
Hand Dryer 0.000 4.000
Urinoir 0.000 5.000
Sekat Urinoir 0.000 4.000
Zink lengkap dengan kran 0.000 0.000
b Lantai 1
Closet Duduk Monoblok + Jet Washer 0.000 8.000
Wastafel Upper Counter 0.000 6.000
Meja beton wastafel 0.000 0.360
Meja Granite 0.000 8.400
Tempat Sabun Westafel 0.000 6.000
Tempat tissue 0.000 8.000
Kaca Cermin 0.000 5.000
Hand Dryer 0.000 5.000
Urinoir 0.000 6.000
Sekat Urinoir 0.000 5.000
Zink lengkap dengan kran 0.000 1.000
c Lantai 2
Closet Duduk Monoblok + Jet Washer 0.000 4.000
Wastafel Upper Counter 0.000 5.000
Meja beton wastafel 0.000 0.360
Meja Granite 0.000 8.400
Tempat Sabun Westafel 0.000 5.000
Tempat tissue 0.000 4.000
Kaca Cermin 0.000 4.000
Hand Dryer 0.000 4.000
Urinoir 0.000 6.000
Sekat Urinoir 0.000 5.000
Zink lengkap dengan kran 0.000 1.000
d Lantai 3
Closet Duduk Monoblok + Jet Washer 0.000 8.000
Wastafel Upper Counter 0.000 5.000
Meja beton wastafel 0.000 0.360
Meja Granite 0.000 8.400
Tempat Sabun Westafel 0.000 5.000
Tempat tissue 0.000 8.000
Kaca Cermin 0.000 5.000
Hand Dryer 0.000 5.000
Urinoir 0.000 6.000
Sekat Urinoir 0.000 5.000
Zink lengkap dengan kran 0.000 1.000
e Pos Security
Closet Jongkok 0.000 3.000
Ember 0.000 3.000
Kran Air 0.000 3.000
Floor Drain 0.000 3.000

9 DIESEL GENSET DAN KELENGKAPANNYA


Pengadaan Kabel Tray 0.000 25.000
Rangka Gypsum Penutup kabel tray 0.000 29.500
Gypsumboard Penutup kabel tray 0.000 29.500
Besi siku 40.40.4 0.000 120.500

10 Pengadaan Passenger Elevator Lift ( Kapasitas 15 Orang )


Plat Bordes dudukan mesin lift T=3 mm 0.000 18.000
Balok saparator lift UNP 150 0.000 1,344.000
Baut Mur Dia. 15 0.000 128.000
Pengecatan 0.000 43.469
Erection 0.000 13.440
Pengadaan Pemasangan Lampu XL 10 Watt 0.000 2.000
Pengadaan Pemasangan Stop Kontak 200 watt 0.000 1.000
Sakelar Ganda 1 0.000 1.000
Intalasi power AC 0.000 1.000
Instalasi Titik Lampu Kabel NYM 3 X 2,5 mm 0.000 4.000

11 Penutup atap zinkcalum untuk rooftank 0.000 30.000

12 Lampu Penerangan Jalan ( Gapura )


1 Type lampu : outbow dustprof 0.000 6.000
2 Instalasi titik lampu Kabel NYM 3 X 2,5 mm ( exposs ) 0.000 6.000

13 Pondasi dudukan main pump diesel 0.000 0.306

14 Pondasi dudukan main pump elektrikal 0.000 0.156

15 Pondasi dudukan jocky pump 0.000 0.038

16 Pondasi dudukan Transfer pump 0.000 0.150

17 Pondasi dudukan Roof Tank 0.000 1.600

18 Septick Tank ukuran 1 m3 0.000 3.000

TOTAL HARGA

Catatan : Untuk Item Pekerjaan yang menggunakan analisa baru dengan kode
Untuk Item Baru dengan analisa SNI sesuai penawaran Rab awal
RD KABUPATEN LOMBOK TIMUR

VOLUME JUM
SAT. KODE ANALISA HARGA SATUAN
SELISIH KONTRAK
5=4-3 6 5 7 8

0.70 m3 SNI 7394:08.6.31.y Rp 10,672,746.85 Rp -


2,261.03 kg SNI 7394:08.6.17.a Rp 12,588.90 Rp -

10.00 bh Ls. Rp 450,000.00 Rp -

285.95 m2 SNI 2837:08.6.16 Rp 62,589.00 Rp -

2.07 m3 SNI 7394:08.6.31.y Rp 10,672,746.85 Rp -


2,097.87 kg SNI 7394:08.6.17.a 12,588.90 Rp -

10.00 bh Ls. Rp 450,000.00 Rp -

1.57 m3 SNI 7394:08.6.30.g 7,908,829.69 Rp -


182.38 m2 SNI 2837:08.6.16 Rp 62,589.00 Rp -

2.15 m3 SNI 7394:08.6.31.y Rp 10,672,746.85 Rp -


2,176.28 kg SNI 7394:08.6.17.a 12,588.90 Rp -

7.00 bh Ls. Rp 450,000.00 Rp -


1.57 m3 SNI 7394:08.6.30.g Rp 7,908,829.69 Rp -
187.84 m2 SNI 2837:08.6.16 Rp 62,589.00 Rp -

1.10 m3 SNI 7394:08.6.31.y Rp 10,672,746.85 Rp -


0.42 m3 SNI 7394:08.6.31.y Rp 10,672,746.85 Rp -
2,102.02 kg SNI 7394:08.6.17.a 12,588.90 Rp -

10.00 bh Ls. Rp 450,000.00 Rp -

296.96 m2 SNI 2837:08.6.16 Rp 62,589.00 Rp -

932.31 m2 Ls. 80,000.00 Rp -


932.31 m2 SNI 2839:08.6.1.a 49,503.96 Rp -
826.12 m' SNI 2839:08.6.8 53,502.75 Rp -

0.51 m3 SNI 7394:08.6.30.l Rp 12,233,968.14 Rp -


1.08 m4 SNI 7394:08.6.30.g 7,908,829.69 Rp -
35.89 m5 SNI 7394:08.6.31.v Rp 5,838,947.29 Rp -
2.06 m6 SNI 7394:08.6.31.t 6,862,743.60 Rp -
1.10 m7 SNI 7394:08.6.31.y Rp 10,672,746.85 Rp -
1,022.82 kg SNI 7394:08.6.17.a 12,588.90 Rp -

2.17 m2 SNI 3434:08.6.6 Rp 441,675.00 Rp -

4.00 0.000 Ls. Rp 450,000.00 Rp -

1,653.95 m2 SNI 7393:08.6.2 Rp 64,564.32 Rp -

49.85 m3 SNI 2836:08.6.3 Rp 617,940.00 Rp -


358.61 m2 SNI 6897:08.6.10 Rp 101,765.00 Rp -
358.61 m2 SNI 2837:08.6.16 Rp 62,589.00 Rp -
358.61 m2 SNI 2837:08.6.27 Rp 28,515.00 Rp -
358.61 m2 A.4.7.1.10 Rp 58,178.20 Rp -
53.44 m2 A.14 Rp 67,123.80 Rp -
43.97 m2 A.14 Rp 67,123.80 Rp -
43.97 m2 A.14 Rp 67,123.80 Rp -
694.24 m2 A.14 Rp 67,123.80 Rp -

58.14 m2 SNI 2839:08.6.1.a Rp 49,503.96 Rp -

53.44 m2 A.15 Rp 25,536.00 Rp -


43.97 m2 A.15 Rp 25,536.00 Rp -
43.97 m2 A.15 Rp 25,536.00 Rp -

694.24 m2 A.15 Rp 25,536.00 Rp -

17.25 m2 A.16 Rp 1,172,616.35 Rp -


17.80 m2 A.16 Rp 1,172,616.35 Rp -
18.63 m2 A.16 Rp 1,172,616.35 Rp -
18.63 m2 A.16 Rp 1,172,616.35 Rp -

110.26 m' ls Rp 150,000.00 Rp -

7.68 m3 SNI 7394:08.6.32 Rp 5,036,818.61 Rp -

1.00 unit ls Rp 10,000,000.00 Rp -

1.00 unit ls Rp 5,000,000.00 Rp -

4.00 Unit A.1 Rp 5,658,540.00 Rp -


4.00 Unit A.4 Rp 1,295,431.20 Rp -
0.29 m3 A.3 Rp 3,558,883.45 Rp -
6.72 m2 A.16 Rp 1,172,616.35 Rp -
4.00 Unit A.10 Rp 721,395.00 Rp -
4.00 Unit A.11 Rp 862,845.00 Rp -
4.00 Unit A.7 Rp 1,226,925.00 Rp -
4.00 Unit A.12 Rp 2,121,750.00 Rp -
5.00 Unit A.8 Rp 3,889,875.00 Rp -
4.00 Unit A.9 Rp 1,937,865.00 Rp -
- Unit A.5 Rp 1,611,405.60 Rp -

8.00 Unit A.1 Rp 5,658,540.00 Rp -


6.00 Unit A.4 Rp 1,295,431.20 Rp -
0.36 m3 A.3 Rp 3,558,883.45 Rp -
8.40 m2 A.16 Rp 1,172,616.35 Rp -
6.00 Unit A.10 Rp 721,395.00 Rp -
8.00 Unit A.11 Rp 862,845.00 Rp -
5.00 Unit A.7 Rp 1,226,925.00 Rp -
5.00 Unit A.12 Rp 2,121,750.00 Rp -
6.00 Unit A.8 Rp 3,889,875.00 Rp -
5.00 Unit A.9 Rp 1,937,865.00 Rp -
1.00 Unit A.5 Rp 1,611,405.60 Rp -

4.00 Unit A.1 Rp 5,658,540.00 Rp -


5.00 Unit A.4 Rp 1,295,431.20 Rp -
0.36 m3 A.3 Rp 3,558,883.45 Rp -
8.40 m2 A.16 Rp 1,172,616.35 Rp -
5.00 Unit A.10 Rp 721,395.00 Rp -
4.00 Unit A.11 Rp 862,845.00 Rp -
4.00 Unit A.7 Rp 1,226,925.00 Rp -
4.00 Unit A.12 Rp 2,121,750.00 Rp -
6.00 Unit A.8 Rp 3,889,875.00 Rp -
5.00 Unit A.9 Rp 1,937,865.00 Rp -
1.00 Unit A.5 Rp 1,611,405.60 Rp -

8.00 Unit A.1 Rp 5,658,540.00 Rp -


5.00 Unit A.4 Rp 1,295,431.20 Rp -
0.36 m3 A.3 Rp 3,558,883.45 Rp -
8.40 m2 A.16 Rp 1,172,616.35 Rp -
5.00 Unit A.10 Rp 721,395.00 Rp -
8.00 Unit A.11 Rp 862,845.00 Rp -
5.00 Unit A.7 Rp 1,226,925.00 Rp -
5.00 Unit A.12 Rp 2,121,750.00 Rp -
6.00 Unit A.8 Rp 3,889,875.00 Rp -
5.00 Unit A.9 Rp 1,937,865.00 Rp -
1.00 Unit A.5 Rp 1,611,405.60 Rp -

3.00 Unit A.2 Rp 1,096,154.00 Rp -


3.00 Unit ls Rp 200,000.00 Rp -
3.00 Unit ls Rp 143,000.00 Rp -
3.00 Unit ls Rp 230,000.00 Rp -

25.00 mt ls Rp 115,300.00 Rp -
29.50 m2 Ls. Rp 80,000.00 Rp -
29.50 m2 SNI 2839:08.6.1.a Rp 49,503.96 Rp -
120.50 kg SNI 7393:08.6.1 Rp 26,405.20 Rp -

18.00 m2 SNI 7394:08.6.32 Rp 550,000.00 Rp -


1,344.00 kg SNI 7393:08.6.1 Rp 26,405.20 Rp -
128.00 bh ls Rp 6,175.00 Rp -
43.47 m2 A.13 Rp 64,564.32 Rp -
13.44 100/kg SNI 7393:08.6.3 Rp 33,812.20 Rp -
2.00 bh 85,000.00 Rp -
1.00 bh 34,500.00 Rp -
1.00 bh 32,000.00 Rp -
1.00 bh Rp -
4.00 ttk 200,000.00 Rp -

30.00 m2 ls Rp 150,000.00 Rp -

6.00 unit ls Rp 750,000.00 Rp -


6.00 m ls Rp 200,000.00 Rp -

0.31 m3 SNI 7394:08.6.32.a Rp 4,230,607.49 Rp -

0.16 m3 SNI 7394:08.6.32.a Rp 4,230,607.49 Rp -

0.04 m3 SNI 7394:08.6.32.a Rp 4,230,607.49 Rp -

0.15 m3 SNI 7394:08.6.32.a Rp 4,230,607.49 Rp -

1.60 m3 SNI 7394:08.6.32.a Rp 4,230,607.49 Rp -

3.00 set ls Rp 2,000,000.00 Rp -

ARGA Rp -

nalisa baru dengan kode A.1 sampai A.16


penawaran Rab awal
JUMLAH HARGA

CCO SELISIH
9 10 = 9 - 8

Rp 7,492,268.29 Rp 7,492,268.29
Rp 28,463,856.65 Rp 28,463,856.65

Rp 4,500,000.00 Rp 4,500,000.00

Rp 17,897,011.61 Rp 17,897,011.61

Rp 22,039,222.24 Rp 22,039,222.24
Rp 26,409,830.32 Rp 26,409,830.32

Rp 4,500,000.00 Rp 4,500,000.00

Rp 12,385,227.29 Rp 12,385,227.29
Rp 11,414,981.82 Rp 11,414,981.82

Rp 22,893,041.99 Rp 22,893,041.99
Rp 27,396,983.88 Rp 27,396,983.88

Rp 3,150,000.00 Rp 3,150,000.00
Rp 12,385,227.29 Rp 12,385,227.29
Rp 11,756,404.82 Rp 11,756,404.82

Rp 11,696,263.27 Rp 11,696,263.27
Rp 4,495,360.97 Rp 4,495,360.97
Rp 26,462,069.22 Rp 26,462,069.22

Rp 4,500,000.00 Rp 4,500,000.00

Rp 18,586,116.50 Rp 18,586,116.50

Rp 74,584,576.00 Rp 74,584,576.00
Rp 46,152,898.34 Rp 46,152,898.34
Rp 44,199,718.58 Rp 44,199,718.58

Rp 6,202,621.85 Rp 6,202,621.85
Rp 8,541,536.07 Rp 8,541,536.07
Rp 209,574,415.61 Rp 209,574,415.61
Rp 14,123,526.33 Rp 14,123,526.33
Rp 11,717,075.13 Rp 11,717,075.13
Rp 12,876,239.12 Rp 12,876,239.12

Rp 959,583.11 Rp 959,583.11

Rp 1,800,000.00 Rp 1,800,000.00

Rp 106,786,259.39 Rp 106,786,259.39

Rp 30,804,926.94 Rp 30,804,926.94
Rp 36,493,743.12 Rp 36,493,743.12
Rp 22,444,916.11 Rp 22,444,916.11
Rp 10,225,707.12 Rp 10,225,707.12
Rp 20,863,167.95 Rp 20,863,167.95
Rp 3,587,089.16 Rp 3,587,089.16
Rp 2,951,097.87 Rp 2,951,097.87
Rp 2,951,097.87 Rp 2,951,097.87
Rp 46,600,194.72 Rp 46,600,194.72

Rp 2,877,962.22 Rp 2,877,962.22

Rp 1,364,641.29 Rp 1,364,641.29
Rp 1,122,690.24 Rp 1,122,690.24
Rp 1,122,690.24 Rp 1,122,690.24

Rp 17,728,176.48 Rp 17,728,176.48

Rp 20,227,632.04 Rp 20,227,632.04
Rp 20,872,571.03 Rp 20,872,571.03
Rp 21,839,979.52 Rp 21,839,979.52
Rp 21,839,979.52 Rp 21,839,979.52

Rp 16,539,000.00 Rp 16,539,000.00

Rp 38,705,432.61 Rp 38,705,432.61

Rp 10,000,000.00 Rp 10,000,000.00

Rp 5,000,000.00 Rp 5,000,000.00

Rp 22,634,160.00 Rp 22,634,160.00
Rp 5,181,724.80 Rp 5,181,724.80
Rp 1,024,958.43 Rp 1,024,958.43
Rp 7,879,981.87 Rp 7,879,981.87
Rp 2,885,580.00 Rp 2,885,580.00
Rp 3,451,380.00 Rp 3,451,380.00
Rp 4,907,700.00 Rp 4,907,700.00
Rp 8,487,000.00 Rp 8,487,000.00
Rp 19,449,375.00 Rp 19,449,375.00
Rp 7,751,460.00 Rp 7,751,460.00
Rp - Rp -

Rp 45,268,320.00 Rp 45,268,320.00
Rp 7,772,587.20 Rp 7,772,587.20
Rp 1,281,198.04 Rp 1,281,198.04
Rp 9,849,977.34 Rp 9,849,977.34
Rp 4,328,370.00 Rp 4,328,370.00
Rp 6,902,760.00 Rp 6,902,760.00
Rp 6,134,625.00 Rp 6,134,625.00
Rp 10,608,750.00 Rp 10,608,750.00
Rp 23,339,250.00 Rp 23,339,250.00
Rp 9,689,325.00 Rp 9,689,325.00
Rp 1,611,405.60 Rp 1,611,405.60

Rp 22,634,160.00 Rp 22,634,160.00
Rp 6,477,156.00 Rp 6,477,156.00
Rp 1,281,198.04 Rp 1,281,198.04
Rp 9,849,977.34 Rp 9,849,977.34
Rp 3,606,975.00 Rp 3,606,975.00
Rp 3,451,380.00 Rp 3,451,380.00
Rp 4,907,700.00 Rp 4,907,700.00
Rp 8,487,000.00 Rp 8,487,000.00
Rp 23,339,250.00 Rp 23,339,250.00
Rp 9,689,325.00 Rp 9,689,325.00
Rp 1,611,405.60 Rp 1,611,405.60

Rp 45,268,320.00 Rp 45,268,320.00
Rp 6,477,156.00 Rp 6,477,156.00
Rp 1,281,198.04 Rp 1,281,198.04
Rp 9,849,977.34 Rp 9,849,977.34
Rp 3,606,975.00 Rp 3,606,975.00
Rp 6,902,760.00 Rp 6,902,760.00
Rp 6,134,625.00 Rp 6,134,625.00
Rp 10,608,750.00 Rp 10,608,750.00
Rp 23,339,250.00 Rp 23,339,250.00
Rp 9,689,325.00 Rp 9,689,325.00
Rp 1,611,405.60 Rp 1,611,405.60

Rp 3,288,462.00 Rp 3,288,462.00
Rp 600,000.00 Rp 600,000.00
Rp 429,000.00 Rp 429,000.00
Rp 690,000.00 Rp 690,000.00

Rp 2,882,500.00 Rp 2,882,500.00
Rp 2,360,000.00 Rp 2,360,000.00
Rp 1,460,366.82 Rp 1,460,366.82
Rp 3,181,826.60 Rp 3,181,826.60

Rp 9,900,000.00 Rp 9,900,000.00
Rp 35,488,588.80 Rp 35,488,588.80
Rp 790,400.00 Rp 790,400.00
Rp 2,806,572.25 Rp 2,806,572.25
Rp 454,435.97 Rp 454,435.97
Rp 170,000.00 Rp 170,000.00
Rp 34,500.00 Rp 34,500.00
Rp 32,000.00 Rp 32,000.00
Rp - Rp -
Rp 800,000.00 Rp 800,000.00

Rp 4,500,000.00 Rp 4,500,000.00

Rp 4,500,000.00 Rp 4,500,000.00
Rp 1,200,000.00 Rp 1,200,000.00

Rp 1,294,565.89 Rp 1,294,565.89

Rp 659,974.77 Rp 659,974.77

Rp 158,647.78 Rp 158,647.78

Rp 634,591.12 Rp 634,591.12

Rp 6,768,971.98 Rp 6,768,971.98

Rp 6,000,000.00 Rp 6,000,000.00

Rp 1,693,735,572.94 Rp 1,693,735,572.94
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR DPRD LOMBOK TIMUR
LOKASI : SELONG - LOMBOK TIMUR
TAHUN ANGGARAN : 2016/2017

ANALISA BIAYA KONSTRUKSI PEKERJAAN SANITASI


A.1 1 bh Pemasangan kloset duduk lengkap dengan jet washer
Bahan:
1 Closet duduk monoblock + jet washer bh
2 Perlengkapan 6% harga kloset duduk hk
Tenaga Kerja:
1 Pekerja oh
2 Tukang batu oh
3 Kepala tukang oh
4 Mandor oh

A.2 1 bh Pemasangan kloset jongkok


Bahan:
1 Closet jongkok CE9 bh
Tenaga Kerja:
1 Pekerja oh
2 Tukang batu oh
3 Kepala tukang oh
4 Mandor oh

A.3 1 m3 Membuat meja beton


Bahan:
1 Balok Kayu Kelas II m
2 Paku kg
3 Besi beton kg
4 Kawat beton kg
5 Semen kg
6 Pasir beton m
7 Batu Pecah 1 - 2 cm (manual) m
8 Air ltr
Tenaga Kerja:
1 Pekerja oh
2 Tukang batu oh
3 Tukang kayu oh
4 Tukang besi oh
5 Kepala tukang oh
6 Mandor oh
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR DPRD LOMBOK TIMUR
LOKASI : SELONG - LOMBOK TIMUR
TAHUN ANGGARAN : 2016/2017

A.4 1 bh Pemasangan wastafel upper counter


Bahan:
1 Westafel Upper counter L521V1A bh
2 Perlengkapan 12% harga wastafel hk
3 Semen kg
4 Pasir pasang m
Tenaga Kerja:
1 Pekerja oh
2 Tukang batu oh
3 Kepala tukang oh
4 Mandor oh

A.5 1 bh Zink royal lengkap dengan kran


Bahan:
1 Zink royal lengkap dengan kran bh
2 Semen kg
3 Pasir pasang m
4 Perlengkapan 12% harga ZINK hk
Tenaga Kerja:
1 Pekerja oh
2 Tukang batu oh
3 Kepala tukang oh
4 Mandor oh
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR DPRD LOMBOK TIMUR
LOKASI : SELONG - LOMBOK TIMUR
TAHUN ANGGARAN : 2016/2017

A.6 1 bh Pemasangan Kran wastafel


Bahan:
1 Kran wastafel bh
2 Seal tape roll
Tenaga Kerja:
1 Pekerja oh
2 Tukang batu oh
3 Kepala tukang oh
4 Mandor oh

A.7 1 bh Kaca cermin


Bahan:
1 Kaca cermin bh
Upah Pasang dan Material Bantu ls

A.8 1 bh Urinoir
Bahan:
1 Urinoir U57M bh
Upah Pasang dan Material Bantu ls

A.9 1 bh Partisi urinoir


Bahan:
1 Partisi Urinoir bh
Upah Pasang dan Material Bantu ls

A.10 1 bh Tempat sabun wastafel


Bahan:
1 Tempat sabun wastafel bh
Upah Pasang dan Material Bantu ls

A.11 1 bh Tisue holder


Bahan:
1 Tisue holder bh
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR DPRD LOMBOK TIMUR
LOKASI : SELONG - LOMBOK TIMUR
TAHUN ANGGARAN : 2016/2017

Upah Pasang dan Material Bantu ls

A.12 1 bh Hand dryer


Bahan:
1 Hand dryer bh
Upah Pasang dan Material Bantu ls

A.13 1 m2 Pengecatan besi


Bahan:
1 Cat Besi kg
2 Amplas lbr
3 Meni besi kg
4 Thinner ltr
5 Kuas bh
Tenaga Kerja:
1 Pekerja oh
2 Tukang cat oh
3 Kepala tukang oh
4 Mandor oh

A.14 1 m2 Pekerjaan Waterproofing


Bahan:
1 Waterproofing kg
Tenaga Kerja:
1 Pekerja oh
2 Tukang cat oh
3 Kepala tukang oh
4 Mandor oh

A.15 1 m2 Pekerjaan Screeding


Bahan:
1 Portland Cement kg
Tenaga Kerja:
1 Pekerja oh
2 Tukang cat oh
3 Kepala tukang oh
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR DPRD LOMBOK TIMUR
LOKASI : SELONG - LOMBOK TIMUR
TAHUN ANGGARAN : 2016/2017

4 Mandor oh

A.16 1 m2 Pemasangan 1 m2 dinding marmer


Bahan:
1 Marmer Kwalitas I Bh
2 Portland Cement (kg) Kg
3 Pasir Pasang M3
4 Semen Warna Kw. Baik Kg
5 Paku 2,5" - 6" Bh
Tenaga Kerja:
1 Pekerja oh
2 Tukang Batu oh
3 Kepala Tukang Batu oh
4 Mandor oh
Rp 5,658,540.00

1.1000 Rp 4,600,200.00 Rp 5,060,220.00


0.0600 Rp 4,600,200.00 Rp 276,012.00

3.3000 Rp 62,400.00 Rp 205,920.00


1.1000 Rp 90,000.00 Rp 99,000.00
0.0010 Rp 108,000.00 Rp 108.00
0.1600 Rp 108,000.00 Rp 17,280.00
Jumlah Rp 5,658,540.00
Over head 10%
Harga Satuan Rp 5,658,540.00
Rp 1,096,154.00

1.1000 Rp 850,000.00 Rp 935,000.00

1.6500 Rp 62,400.00 Rp 102,960.00


0.5500 Rp 90,000.00 Rp 49,500.00
0.0005 Rp 108,000.00 Rp 54.00
0.0800 Rp 108,000.00 Rp 8,640.00
Jumlah Rp 1,096,154.00
Over head 10%
Harga Satuan Rp 1,096,154.00
Rp 3,558,883.45

0.1250 Rp 4,275,000.00 Rp 534,417.75


0.8400 Rp 22,705.00 Rp 19,072.20
151.2000 Rp 11,000.00 Rp 1,663,200.00
2.1000 Rp 22,500.00 Rp 47,250.00
231.0000 Rp 1,500.00 Rp 346,500.00
0.3780 Rp 247,000.00 Rp 93,366.00
0.6300 Rp 235,000.00 Rp 148,050.00
21.5000 Rp 125.00 Rp 2,687.50

4.2000 Rp 62,400.00 Rp 262,080.00


1.3860 Rp 90,000.00 Rp 124,740.00
1.3860 Rp 90,000.00 Rp 124,740.00
1.3860 Rp 90,000.00 Rp 124,740.00
0.4200 Rp 108,000.00 Rp 45,360.00
0.2100 Rp 108,000.00 Rp 22,680.00
Jumlah Rp 3,558,883.45
Over head 10%
Harga Satuan Rp 3,558,883.45
Rp 1,295,431.20

1.1000 Rp 863,460.00 Rp 949,806.00


0.1200 Rp 863,460.00 Rp 103,615.20
6.0000 Rp 1,380.00 Rp 8,280.00
0.0100 Rp 135,000.00 Rp 1,350.00

1.2000 Rp 62,400.00 Rp 74,880.00


1.4500 Rp 90,000.00 Rp 130,500.00
0.1500 Rp 108,000.00 Rp 16,200.00
0.1000 Rp 108,000.00 Rp 10,800.00
Jumlah Rp 1,295,431.20
Over head 10%
Harga Satuan Rp 1,295,431.20
Rp 1,611,405.60

1.1000 Rp 1,045,500.00 Rp 1,150,050.00


0.1200 Rp 1,380.00 Rp 165.60
0.0100 Rp 135,000.00 Rp 1,350.00
0.1200 Rp 1,045,500.00 Rp 125,460.00

1.4500 Rp 62,400.00 Rp 90,480.00


1.1500 Rp 90,000.00 Rp 103,500.00
1.2000 Rp 108,000.00 Rp 129,600.00
0.1000 Rp 108,000.00 Rp 10,800.00
Jumlah Rp 1,611,405.60
Over head 10%
Harga Satuan Rp 1,611,405.60
Rp 620,131.50

1.1000 Rp 553,500.00 Rp 608,850.00


0.0250 Rp 1,500.00 Rp 37.50

0.0100 Rp 62,400.00 Rp 624.00


0.1000 Rp 90,000.00 Rp 9,000.00
0.0100 Rp 108,000.00 Rp 1,080.00
0.0050 Rp 108,000.00 Rp 540.00
Jumlah Rp 620,131.50
Over head 10%
Harga Satuan Rp 620,131.50
Rp 1,226,925.00

1.0000 Rp 1,168,500.00 Rp 1,168,500.00


1.0000 Rp 58,425.00 Rp 58,425.00
Jumlah Rp 1,226,925.00
Over head 10%
Harga Satuan Rp 1,226,925.00
Rp 3,889,875.00

1.1000 Rp 3,382,500.00 Rp 3,720,750.00


1.0000 Rp 169,125.00 Rp 169,125.00
Jumlah Rp 3,889,875.00
Over head 10%
Harga Satuan Rp 3,889,875.00
Rp 1,937,865.00

1.1000 Rp 1,685,100.00 Rp 1,853,610.00


1.0000 Rp 84,255.00 Rp 84,255.00
Jumlah Rp 1,937,865.00
Over head 10%
Harga Satuan Rp 1,937,865.00
Rp 721,395.00

1.1000 Rp 627,300.00 Rp 690,030.00


1.0000 Rp 31,365.00 Rp 31,365.00
Jumlah Rp 721,395.00
Over head 10%
Harga Satuan Rp 721,395.00
Rp 862,845.00

1.1000 Rp 750,300.00 Rp 825,330.00


1.0000 Rp 37,515.00 Rp 37,515.00
Jumlah Rp 862,845.00
Over head 10%
Harga Satuan Rp 862,845.00
Rp 2,121,750.00

1.1000 Rp 1,845,000.00 Rp 2,029,500.00


1.0000 Rp 92,250.00 Rp 92,250.00
Jumlah Rp 2,121,750.00
Over head 10%
Harga Satuan Rp 2,121,750.00
Rp 64,564.32

0.2000 Rp 52,000.00 Rp 10,400.00


0.4000 Rp 5,890.00 Rp 2,356.00
0.1670 Rp 34,960.00 Rp 5,838.32
0.1500 Rp 22,000.00 Rp 3,300.00
0.0500 Rp 15,200.00 Rp 760.00

0.2000 Rp 62,400.00 Rp 12,480.00


0.2500 Rp 102,000.00 Rp 25,500.00
0.0250 Rp 114,000.00 Rp 2,850.00
0.0100 Rp 108,000.00 Rp 1,080.00
Jumlah Rp 64,564.32
Over head 10%
Harga Satuan Rp 64,564.32
Rp 67,123.80

1.0000 Rp 60,000.00 Rp 60,000.00

0.0630 Rp 62,400.00 Rp 3,931.20


0.0063 Rp 102,000.00 Rp 642.60
0.0200 Rp 114,000.00 Rp 2,280.00
0.0025 Rp 108,000.00 Rp 270.00
Jumlah Rp 67,123.80
Over head 10%
Harga Satuan Rp 67,123.80
Rp 25,536.00

4.2000 Rp 1,380.00 Rp 5,796.00

0.1000 Rp 62,400.00 Rp 6,240.00


0.0100 Rp 102,000.00 Rp 1,020.00
0.1000 Rp 114,000.00 Rp 11,400.00
0.0100 Rp 108,000.00 Rp 1,080.00
Jumlah Rp 25,536.00
Over head 10%
Harga Satuan Rp 25,536.00
Rp 1,179,313.55

1.0600 Rp 872,195.00 Rp 924,526.70


12.4400 Rp 1,380.00 Rp 17,167.20
0.0250 Rp 135,000.00 Rp 3,375.00
0.6500 Rp 23,250.00 Rp 15,112.50
3.0300 Rp 18,905.00 Rp 57,282.15

1.3000 Rp 62,400.00 Rp 81,120.00


0.6500 Rp 102,000.00 Rp 66,300.00
0.0650 Rp 114,000.00 Rp 7,410.00
0.0650 Rp 108,000.00 Rp 7,020.00
Jumlah Rp 1,179,313.55
Over head 10%
Harga Satuan Rp 1,179,313.55
BACK UP VOLUME PEKERJAAN

Pekerjaan : PEMBANGUNAN GEDUNG KANTOR DPRD KABUPATEN LOMBOK TIMUR

NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN


1 2 3 4 5
PEKERJAAN LANTAI DASAR (BASEMANT)
I PEKERJAAN PENDAHULUAN/PERSIAPAN
1 Pek. Pembersihan Lokasi Proyek Ls 1.00 ls
1.00 = 1.00

2 Papan nama proyek Ukuran 1.20 x 2.40 m Jumlah 1.00 unit


1.00 = 1.00

3 Pasangan Papan Bowplank Panjang 230.00 m


230.00 = 230.00

4 Pagar Pengaman Proyek Panjang 301.00 m


301.00 = 301.00

II PEKERJAAN TANAH DAN PASIR


1 Pek. Galian Tanah Pondasi Footplat P x L x T x N 3,034.27 m3
FP.1 = 3.30 3.30 3.15 27.00 = 926.19
FP.2A = 2.90 2.90 3.15 6.00 = 158.95
FP.2 = 193.00 2.90 3.15 1.00 = 1,763.06
FP.3 = 2.40 2.40 3.15 2.00 = 36.29
FP.4 = 1.90 1.90 3.15 11.00 = 125.09
FP.5 = 1.40 1.40 3.15 4.00 = 24.70

2 Pek. Galian Tanah Perbaikan Lahan = Luas bangun x L 3,452.69 m3


= 2,215.00 x 0.80 = 1,772.00 Basement - 0,5 dari tanah lu
= Hitungan galian eksisting bangunan = 1,680.69 tebal plat basement 20 cm ,

3 Pek. Galian Tanah Pondasi Batu Kali P x L x T 160.10 m3


Horizontal = 131.00 0.95 1.05 = 130.67
Vertikal = 29.50 0.95 1.05 = 29.43

4 Pek. Urugan Kembali V. Galian - V. Potplat - V. Pedestal - V. Urugan pasir 2,577.09 m3


= 3,034.27 - 301.00 - 69.03 - 87.15 = 2,577.09
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5

5 Pek. Urugan Pasir Bawah Pondasi Footplat P x L x T x N 87.15 m3


FP.1 = 3.10 x 3.10 x 0.10 x 27.00 = 25.95

FP.2A = 2.70 x 2.70 x 0.10 x 6.00 = 4.37


FP.2 = 193.00 x 2.70 x 0.10 x 1.00 = 52.11
FP.3 = 2.20 x 2.20 x 0.10 x 2.00 = 0.97
FP.4 = 1.70 x 1.70 x 0.10 x 11.00 = 3.18
FP.5 = 1.20 x 1.20 x 0.10 x 4.00 = 0.58

6 Pek. Urugan Pasir Bawah Pondasi Batu Kali P x L x T x N 15.25 m3


Horizontal = 131.00 0.95 0.10 1.00 = 12.45
Vertikal = 29.50 0.95 0.10 1.00 = 2.80

7 Pek. Urugan Pasir Bawah Lantai = luas x L x T 221.50 m3


= 48.50 x 18.00 x 0.10 = 87.30
= 30.50 x 44.00 x 0.10 = 134.20

III PEKERJAAN PASANGAN DAN PLESTERAN

1 Pek. Batu Kosong Panjang x Lebar x Tinggi 30.50 m3


Pondasi Batu Kali (horisontal) = 131.00 x 0.95 x 0.20 = 24.89
Pondasi Batu Kali (vertikal) = 29.50 x 0.95 x 0.20 = 5.61

2 Pek. Pas. Pondasi Batu Kali, Camp.1PC:5PS Panjang x Lebar x Tinggi 63.20 m3
Pondasi Batu Kali (horisontal) = 131.00 x 0.53 x 0.75 = 51.58
Pondasi Batu Kali (vertikal) = 29.50 x 0.53 x 0.75 = 11.62

3 Pek. Pas. Dinding Trassram 1Bt. Camp.1PC:3PS Panjang x Lebar 780.13 m2


= 102.45 x 2.50 = 256.13
= 145.50 x 2.50 = 363.75
= 19.30 x 2.50 = 48.25
= 112.00 x 1.00 = 112.00

4 Pek. Pas. Dinding Trassram 1/2Bt. Camp.1PC:3PS = 39.40 x 3.50 = 137.90 137.90 m2

5 Pek. Pas. Dinding Bata 1/2Bt. Camp.1PC:5PS Panjang x Lebar 765.68 m2


Pas. Dinding Bata 1/2Bt. (horisontal) = 157.96 x 3.00 = 473.88
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
Pas. Dinding Bata 1/2Bt. (vertikal) = 97.31 x 2.90 = 282.20
Ruang Pompa 10.00 x 2.90 = 29.00
Ruang Server 5.40 x 2.90 = 15.66
PENGURANGAN P3 = 3.49 x 5.00 = 17.43
P4 = 1.85 x 6.00 = 11.07
P5 = 1.64 x 4.00 = 6.56

6 Pek. Plesteran Trassram Bata, Camp.1PC:3PS Total Volume Pas. Dinding Bata Trasram x 2.00 = 1,836.05 1,836.05 m2

7 Pek. Plesteran Dinding Bata, Camp.1PC:5PS Total Volume Pas. Dinding Bata x 2.00 = 1,531.37 1,531.37 m2

8 Pek. Plesteran Kolom Beton, Camp.1PC:5PS Lebar x Tinggi x Jumlah 630.00 m2


K1 = 2.40 x 3.50 x 65.00 = 546.00
K2 = 2.40 x 3.50 x 2.00 = 16.80
K3 = 2.40 x 3.50 x 4.00 = 33.60
K8 = 1.20 x 3.50 x 8.00 = 33.60

9 Pek. Plesteran Balok Beton, Camp.1PC:5PS Panjang x Tinggi 900.01 m2


B1 = 16.80 x 1.51 = 25.37
B3 = 111.50 x 1.21 = 134.92
B4 = 87.90 x 1.21 = 106.36
B5 = 82.00 x 1.21 = 99.22
B7 = 98.50 x 1.01 = 99.49
B8 = 11.40 x 1.01 = 11.51
B9 = 24.83 x 1.01 = 25.08
B12 = 23.10 x 1.01 = 23.33
B13 = 29.40 x 1.01 = 29.69
B14 = 5.90 x 1.01 = 5.96
B15 = 6.10 x 0.81 = 4.94
B16 = 125.60 x 0.91 = 114.30
B17 = 115.00 x 0.91 = 104.65
B19 = 18.60 x 0.81 = 15.07
B22 = 14.54 x 0.61 = 8.87
BP = 111.73 x 0.57 = 63.69
Bordes = 9.00 x 0.81 = 7.29
Plat tangga = 2.82 x 1.50 = 4.22
Plat tangga = 1.50 x 2.85 = 4.28
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
Plat tangga = 5.63 x 1.50 = 8.45
Kanopi sisi timur barat
= 3.72 x 0.15 x 6.00 = 3.35

10 Pek. Acian = Acian Plat Basement = 1,609.76


= Total Volume Plesteran = 6,507.19 6,507.19 m2

IV PEKERJAAN LANTAI dan PLAFOUND


1 Pek. Pas. Lantai Keramik 60x60cm (Anti Slip) Panjang x Lebar 963.44 m2
= 22.65 x 3.85 = 87.20
= 30.50 x 24.00 = 732.00
= 6.00 x 25.00 = 150.00

= 969.20
Pengurangan Kolom (16 bh 60x60) = 16.00 x 0.36 = 5.76
= 963.44
2 Pek. Pas. Lantai Keramik 60x60cm Panjang x Lebar 347.27 m2
= 12.00 x 6.00 = 72.00
= 8.80 x 6.00 = 52.80
= 22.63 x 2.02 = 45.71
= 2.44 x 6.00 = 14.64
= 2.44 x 6.00 = 14.64
= 25.00 x 6.00 = 150.00
= 349.79
Pengurangan Kolom (7 bh 60x60) = 7.00 x 0.36 = 2.52
= 347.27
3 Pek. Pas. Lantai Keramik Tangga Panjang x Lebar
= 11.50 x 1.50 = 17.25 17.25 m2

4 Pek. Pas. Plint Keramik 15x60cm Panjang 442.56 m'


= 16.750 = 16.75
= 21.950 = 21.95
= 9.650 = 9.65
= 23.050 = 23.05
= 37.500 = 37.50
= 30.400 = 30.40
= 37.550 = 37.55
= 99.408 = 99.41
= 130.3 = 130.30
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
= 36 = 36.00
= 442.56
5 Pek. Pas. Lantai Keramik 30x30cm Panjang x Lebar 24.20 m2
= 4.72 x 2.95 = 13.92
= 4.92 x 1.35 = 6.64
= 2.42 x 1.50 = 3.63
= 24.20
6 Pek. Pas. Lantai Keramik KM/WC 20x20cm Panjang x Lebar x Jumlah 7.40 m2
= 1.35 x 1.35 x 3.00 = 5.47
= 1.35 x 1.43 x 1.00 = 1.93
= 7.40
7 Pek. Pas. Keramik Dinding KM/WC 20x40cm Panjang x Tinggi
= 49.15 x 1.80 = 88.47 113.31 m2
tempat wudhu = 13.80 x 1.80 = 24.84

8 Pek. Rangka Plafond Besi Hollow Luas 35.94 m2


= 35.94 = 35.94

9 Pek. Plafond Gypsumboard t=9mm = - 35.94 m2


10 Pek. List Plafond Gypsum 10cm Panjang
24.00 24.00 m'

V PEKERJAAN BETON
1 Pek. Lantai Kerja t=10cm, K.100 Panjang x Lebar x Tinggi x Jumlah 43.58 m3
FP.1 = 3.10 x 3.10 x 0.05 x 27.00 = 12.97
FP.2A = 2.70 x 2.70 x 0.05 x 6.00 = 2.19
FP.2 = 193.00 x 2.70 x 0.05 x 1.00 = 26.06
FP.3 = 2.20 x 2.20 x 0.05 x 2.00 = 0.48
FP.4 = 1.70 x 1.70 x 0.05 x 11.00 = 1.59
FP.5 = 1.20 x 1.20 x 0.05 x 4.00 = 0.29

2 Pek. Beton Cor Wiremesh Lantai t=20cm, K.250 Panjang x Lebar x Tinggi x Jumlah 240.73 m3
= 18.00 x 4.30 x 0.20 x 1.00 = 15.48
= 5.50 x 12.00 x 0.20 x 1.00 = 13.20
= 30.00 x 30.50 x 0.20 x 1.00 = 183.00
= 5.23 x 4.60 x 0.20 x 2.00 = 9.62
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
= 6.50 x 7.50 x 0.20 x 1.00 = 9.75
= 6.50 x 6.50 x 0.20 x 1.00 = 8.45
= 1.75 x 1.75 x 0.20 x 2.00 = 1.23

3 Pek. Pondasi Footplat FP.1=2,90m'x2,90m', K.250 Panjang x Lebar x Tinggi x Jumlah 84.56 m3
= 2.90 x 2.90 x 0.30 x 27.00 = 68.12
= 2.90 x 2.10 x 0.10 x 27.00 = 16.44

5 Pek. Pondasi Footplat FP.2.a=2,50x2,50m', K.250 Panjang x Lebar x Tinggi x Jumlah 13.58 m3
= 2.50 x 2.50 x 0.30 x 6.00 = 11.25
= 2.50 x 1.55 x 0.10 x 6.00 = 2.33

4 Pek. Pondasi Footplat FP.2=2,50m'x203,00m', K.250 Panjang x Lebar x Tinggi x Jumlah 190.05 m3
= 210.00 x 1.55 x 0.10 x 1.00 = 32.55
= 210.00 x 2.50 x 0.30 x 1.00 = 157.50

6 Pek. Pondasi Footplat FP.3=2,00x2,00m', K.250 Panjang x Lebar x Tinggi x Jumlah 2.92 m3
= 2.00 x 2.00 x 0.30 x 2.00 = 2.40
= 2.00 x 1.30 x 0.10 x 2.00 = 0.52

7 Pek. Pondasi Footplat FP.4=1,50x1,50m', K.250 Panjang x Lebar x Tinggi x Jumlah 7.84 m3
= 1.50 x 1.50 x 0.30 x 11.00 = 7.43
= 1.50 x 0.25 x 0.10 x 11.00 = 0.41

8 Pek. Pondasi Footplat FP.5=1,00x1,00m', K.250 Panjang x Lebar x Tinggi x Jumlah 1.50 m3
= 1.00 x 1.00 x 0.30 x 4.00 = 1.20
= 1.00 x 0.75 x 0.10 x 4.00 = 0.30

9 Pek. Pondasi Footplat Tangga =1,00x1,50m', K.250 Panjang x Lebar x Tinggi x Jumlah 0.55 m3
= 1.00 x 1.50 x 0.30 x 1.00 = 0.45
= 1.00 x 1.00 x 0.10 x 1.00 = 0.10

10 Pek. Sloof Beton S.1=20x40cm', K.250 Panjang x Lebar x Tinggi x Jumlah 1.34 m3
= 8.40 x 0.20 x 0.40 x 2.00 = 1.34

11 Pek. Sloof Beton S.2=20x30m', K.250 Panjang x Lebar x Tinggi x Jumlah 39.92 m3
MEMANJANG = 0.90 x 0.20 x 0.30 x 2.00 = 0.11
= 1.00 x 0.20 x 0.30 x 2.00 = 0.12
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
= 4.60 x 0.20 x 0.30 x 2.00 = 0.55
= 4.90 x 0.20 x 0.30 x 18.00 = 5.29
= 5.40 x 0.20 x 0.30 x 12.00 = 3.89
= 5.90 x 0.20 x 0.30 x 29.00 = 10.27
MELINTANG = 1.08 x 0.20 x 0.30 x 4.00 = 0.26
= 2.40 x 0.20 x 0.30 x 2.00 = 0.29
= 3.25 x 0.20 x 0.30 x 2.00 = 0.39
= 5.40 x 0.20 x 0.30 x 51.00 = 16.52
= 5.80 x 0.20 x 0.30 x 2.00 = 0.70
= 5.90 x 0.20 x 0.30 x 2.00 = 0.71
= 6.90 x 0.20 x 0.30 x 2.00 = 0.83

12 Pek. Sloof Beton S.3=15x20cm, K.250 Panjang x Lebar x Tinggi x Jumlah 2.030 m3
= 67.65 x 0.15 x 0.20 x 1.00 = 2.03

13 Pek. Kolom Beton Pedstal K.1 = 60x60cm', K.250 Panjang x Lebar x Tinggi x Jumlah 60.84 m3
= 0.60 x 0.60 x 2.60 x 65.00 = 60.84

14 Pek. Kolom Beton Pedstal K.2 = 60x60cm', K.250 Panjang x Lebar x Tinggi x Jumlah 1.87 m3
= 0.60 x 0.60 x 2.60 x 2.00 = 1.87

15 Pek. Kolom Beton Pedstal K.3 = 60x60cm', K.250 Panjang x Lebar x Tinggi x Jumlah 3.74 m3
= 0.60 x 0.60 x 2.60 x 4.00 = 3.74

16 Pek. Kolom Beton Pedstal K.8 = 30x30cm', K.250 Panjang x Lebar x Tinggi x Jumlah 1.87 m3
= 0.30 x 0.30 x 2.60 x 8.00 = 1.87

17 Pek. Kolom Beton Pedstal K.10 = 15x45cm', K.250 Panjang x Lebar x Tinggi x Jumlah 0.70 m3
= 0.15 x 0.45 x 2.60 x 4.00 = 0.70

18 Pek. Kolom Beton K.1 = 60x60cm', K.250 Panjang x Lebar x Tinggi x Jumlah 81.90 m3
= 0.60 x 0.60 x 3.50 x 65.00 = 81.90

19 Pek. Kolom Beton K.2 = 60x60cm', K.250 Panjang x Lebar x Tinggi x Jumlah 2.52 m3
= 0.60 x 0.60 x 3.50 x 2.00 = 2.52

20 Pek. Kolom Beton K.3 = 60x60cm', K.250 Panjang x Lebar x Tinggi x Jumlah 5.04 m3
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
= 0.60 x 0.60 x 3.50 x 4.00 = 5.04

21 Pek. Kolom Beton K.8 = 30x30cm', K.250 Panjang x Lebar x Tinggi x Jumlah 2.52 m3
= 0.30 x 0.30 x 3.50 x 8.00 = 2.52

22 Pek. Kolom Beton K.10 = 15x45cm', K.250 Panjang x Lebar x Tinggi x Jumlah 0.95 m3
= 0.15 x 0.45 x 3.50 x 4.00 = 0.95

23 Pek. Kolom Beton Praktis KP.1 =13x13cm, K.250 Panjang x Lebar x Tinggi x Jumlah 2.31 m3
= 0.13 x 0.13 x 3.50 x 39.00 = 2.31

24 Pek. Kolom Beton Praktis KP.2 = 15x30cm, K.250 Panjang x Lebar x Tinggi x Jumlah 2.05 m3
= 0.15 x 0.30 x 3.50 x 13.00 = 2.05

25 Pek. Balok Beton B.1 = 25x75cm, K.250 Panjang x Lebar x Tinggi x Jumlah 3.15 m3
Level lantai 1 = 16.80 x 0.25 x 0.75 x 1.00 = 3.15

26 Pek. Balok Beton B.3 = 25x60cm, K.250 Panjang x Lebar x Tinggi x Jumlah 16.73 m3
Level lantai 1 = 111.50 x 0.25 x 0.60 x 1.00 = 16.73

27 Pek. Balok Beton B.4 = 25x60cm, K.250 Panjang x Lebar x Tinggi x Jumlah 13.995 m3
Level lantai 1 = 93.30 x 0.25 x 0.60 x 1.00 = 13.995

28 Pek. Balok Beton B.5 = 25x60cm, K.250 Panjang x Lebar x Tinggi x Jumlah 13.04 m3
Level lantai 1 = 86.90 x 0.25 x 0.60 x 1.00 = 13.04

29 Pek. Balok Beton B.7 = 25x50cm, K.250 Panjang x Lebar x Tinggi x Jumlah 10.00 m3

Level lantai 1 = 80.00 x 0.25 x 0.50 x 1.00 = 10.00

30 Pek. Balok Beton B.8 = 25x50cm, K.250 Panjang x Lebar x Tinggi x Jumlah 1.35 m3
Level lantai 1 = 10.80 x 0.25 x 0.50 x 1.00 = 1.35

31 Pek. Balok Beton B.9 = 25x50cm, K.250 Panjang x Lebar x Tinggi x Jumlah 3.10 m3
Level lantai 1 = 24.83 x 0.25 x 0.50 x 1.00 = 3.10

32 Pek. Balok Beton B.12 = 25x50cm, K.250 Panjang x Lebar x Tinggi x Jumlah 2.89 m3
Level lantai 1 = 23.10 x 0.25 x 0.50 x 1.00 = 2.89
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5

33 Pek. Balok Beton B.13 = 25x50cm, K.250 Panjang x Lebar x Tinggi x Jumlah 3.80 m3
Level lantai 1 = 30.40 x 0.25 x 0.50 x 1.00 = 3.80

34 Pek. Balok Beton B.14 = 25x50cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.74 m3
Level lantai 1 = 5.90 x 0.25 x 0.50 x 1.00 = 0.74

35 Pek. Balok Beton B.15 = 25x40cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.62 m3
Level lantai 1 = 6.20 x 0.25 x 0.40 x 1.00 = 0.62

36 Pek. Balok Beton B.16 = 20x45cm, K.250 Panjang x Lebar x Tinggi x Jumlah 11.24 m3
Level lantai 1 = 124.90 x 0.20 x 0.45 x 1.00 = 11.24

37 Pek. Balok Beton B.17 = 20x45cm, K.250 Panjang x Lebar x Tinggi x Jumlah 10.08 m3
Level lantai 1 = 112.03 x 0.20 x 0.45 x 1.00 = 10.08

38 Pek. Balok Beton B.19 = 20x40cm, K.250 Panjang x Lebar x Tinggi x Jumlah 1.47 m3
Level lantai 1 = 18.40 x 0.20 x 0.40 x 1.00 = 1.47

39 Pek. Balok Beton B.22 = 15x30cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.37 m3
Level lantai 1 = 8.27 x 0.15 x 0.30 x 1.00 = 0.37

40 Pek. Balok Beton BP = 15x25cm, K.250 Panjang x Lebar x Tinggi x Jumlah 4.19 m3
Level lantai 1 = 111.73 x 0.15 x 0.25 x 1.00 = 4.19

41 Pek. Balok Bordes Tangga = 15x25cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.33 m3
Level lantai 1 = 8.70 x 0.15 x 0.25 x 1.00 = 0.33

42 Pek. Plat Lantai Beton t=12cm, K.250 Luas x Tebal x Jumlah 150.34 m3
= 30.96 x 0.12 x 1.00 = 3.72
= 30.70 x 0.12 x 1.00 = 3.68

= 31.79 x 0.12 x 2.00 = 7.63


= 30.42 x 0.12 x 1.00 = 3.65
= 15.90 x 0.12 x 1.00 = 1.91
= 29.02 x 0.12 x 2.00 = 6.96
= 26.15 x 0.12 x 1.00 = 3.14
= 34.67 x 0.12 x 7.00 = 29.12
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
= 25.51 x 0.12 x 1.00 = 3.06
= 29.10 x 0.12 x 1.00 = 3.49
= 12.82 x 0.12 x 1.00 = 1.54
= 27.99 x 0.12 x 3.00 = 10.08
= 34.17 x 0.12 x 1.00 = 4.10
= 28.18 x 0.12 x 3.00 = 10.14
= 34.17 x 0.12 x 1.00 = 4.10
= 69.36 x 0.12 x 1.00 = 8.32
= 28.37 x 0.12 x 1.00 = 3.40
= 28.11 x 0.12 x 1.00 = 3.37
= 34.24 x 0.12 x 1.00 = 4.11
= 29.02 x 0.12 x 1.00 = 3.48
= 28.31 x 0.12 x 1.00 = 3.40
= 26.87 x 0.12 x 1.00 = 3.22
= 67.56 x 0.12 x 1.00 = 8.11
= 68.76 x 0.12 x 1.00 = 8.25
= 69.54 x 0.12 x 1.00 = 8.34

43 Pek. Plat Tangga Beton t=15cm, K.250 Panjang x Lebar x Tinggi x Jumlah 2.18 m3
= 9.70 1.50 0.15 1.00 = 2.18

44 Pek. Listplank Beton t=7cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.79 m3
= 37.80 0.30 0.07 1.00 = 0.79

VI PEKERJAAN KAYU
1 Pek. Kusen Kayu, Klas I Lebar x Jumlah x Luas 0.51 m3
P3 = 0.13 x 5.00 x 0.28 = 0.18
P4 = 0.13 x 7.00 x 0.24 = 0.21
P5 = 0.13 x 4.00 x 0.23 = 0.12
= 0.51
2 Pek. Daun Pintu Panil + Kaca 5mm, Klas II Jumlah x Luas 25.84 m2
P3 = 5.00 x 3.04 = 15.20
P4 = 7.00 x 1.52 = 10.64
= 25.84
3 Pek. Daun Pintu Tripleks Lapis Alluminium Jumlah x Luas

P5 = 4.00 x 1.33 = 5.32 5.32 m2


NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5

VII PEKERJAAN PENGUNCI DAN PENGGANTUNG


1 Pek. Handle Pintu Double Jumlah 10.00 bh
P3 = 10.00 = 10.00
2 Pek. Angker Kusen = 96.00 96.00 bh
3 Pek. Kunci Pintu Mutu Tinggi 16.00 bh
P3 = 5.00 = 5.00
P4 = 7.00 = 7.00
P5 = 4.00 = 4.00
4 Pek. Engsel Pintu 63.00 bh
P3 = 30.00 = 30.00
P4 = 21.00 = 21.00
P5 = 12.00 = 12.00
5 Pek. Expagolet
P3 = 10.00 = 10.00 10.00 bh
6 Pek. Grendel Pintu 16.00 bh
P3 = 5.00 = 5.00
P4 = 7.00 = 7.00
P5 = 4.00 = 4.00

7 Pek. Relling Stainlessteel Tangga Panjang x Lebar 6.30 m2


= 7.00 x 0.90 = 6.30

VIII PEKERJAAN PENGECATAN


1 Pek. Cat Kayu Panjang x Lebar x Jumlah 89.71 m2
P3 = 5.50 x 0.23 x 5.00 = 6.33
P4 = 5.70 x 0.36 x 7.00 = 14.36
P5 = 4.60 x 0.36 x 4.00 = 6.62
= 1.60 x 4.00 x 5.00 = 32.00
= 0.80 x 4.00 x 6.00 = 19.20
= 0.70 x 4.00 x 4.00 = 11.20
= 89.71

2 Pek. Cat Dinding Tembok Volume Pek. Acian = 6,507.19 6,507.19 m2

PEKERJAAN LANTAI 1 (SATU)


I PEKERJAAN PASANGAN DAN PLESTERAN
1 Pek. Pas. Dinding Trassram 1/2Bt. Camp.1PC:3PS Panjang x Tinggi
= 57.89 x 3.85 = 222.88 222.88 m2
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5

2 Pek. Pas. Dinding Bata 1/2Bt. Camp.1PC:5PS Panjang x Tinggi 1,063.78 m2


Pas. Dinding Bata 1/2Bt. (horisontal) = 152.55 x 3.85 = 587.32
Pas. Dinding Bata 1/2Bt. (vertikal) = 175.37 x 3.85 = 675.17
Tanggulan ACP sisi timur barat = 92.85 x 0.30 = 27.86
Pas. Bata KM/WC Sekwan 6.60 x 3.85 = 25.41
1,315.76
PENGURANGAN Panjang x Tinggi x Jumlah
PJ.1 = 2.55 x 3.05 x 1.00 = 7.78
PJ.2 = 2.55 x 3.05 x 1.00 = 7.78
PJ.3 = 2.70 x 3.05 x 2.00 = 16.47
P.1 = 1.70 x 3.05 x 9.00 = 46.67
P.2 = 0.90 x 3.05 x 3.00 = 8.24
P5 = 0.80 x 2.05 x 7.00 = 11.48
J.1 = 2.05 x 2.75 x 2.00 = 11.28
J.2 = 1.55 x 2.20 x 34.00 = 115.94
J.6 = 2.25 x 11.25 x 1.00 = 25.31
V.1 = 0.80 x 0.65 x 2.00 = 1.04
= 251.97

3 Pek. Plesteran Trassram Bata, Camp.1PC:3PS = Volume Pas Dinding Trassram


= 222.88 = 222.88 222.88 m2

4 Pek. Plesteran Dinding Bata, Camp.1PC:5PS = Volume Pas Dinding Bata x 2.00
= 1,063.78 x 2.00 = 2,127.57 2,127.57 m2

5 Pek. Plesteran Kolom Beton, Camp.1PC:5PS Panjang x Tinggi x Jumlah 434.67 m2


K4 = 2.00 x 3.75 x 51.00 = 382.50
K8 = 1.20 x 3.75 x 2.00 = 9.00
K9 = 1.00 x 3.75 x 2.00 = 7.50
K10 = 1.20 x 3.75 x 4.00 = 18.00
K11 = 0.20 x 3.75 x 16.00 = 11.78
K12 = 0.20 x 3.75 x 8.00 = 5.89

5a Pek. Plesteran Balok Beton, Camp.1PC:5PS Panjang x Tinggi x Jumlah 285.95 m2


B5 = 5.40 x 0.60 x 13.00 = 42.12
B9 = 5.40 x 0.50 x 2.00 = 5.40
B13 = 30.40 x 0.50 x 1.00 = 15.20
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
B15 = 3.10 x 0.40 x 2.00 = 2.48
B12 = 13.90 x 0.50 x 1.00 = 6.95
B8 = 5.40 x 0.50 x 2.00 = 5.40
B22 = 4.00 x 0.30 x 2.00 = 2.40

VOID B5 = 5.90 x 0.60 x 2.00 = 7.08


B4 = 5.40 x 0.60 x 4.00 = 12.96
Plat tangga = 5.63 x 1.50 x 3.00 = 25.34
Plat tangga = 1.50 x 2.85 x 3.00 = 12.83
Plat tangga = 5.63 x 1.50 x 3.00 = 25.34
Dudukan jendela J6= 34.30 x 0.70 = 24.01
Plat ssunscreen = 1.79 x 55.00 x 1.00 = 98.45

6 Pek. Acian = Total Volume Plesteran = 3,071.06 3,071.06 m2

7 Pek. Dinding Roster GRC t=15cm' Panjang x Tinggi


= 38.29 x 0.93 = 35.61 35.61 m2

8 Pek. Dinding Ornament GRC t=5cm' Panjang x Tinggi x Jumlah 295.40 m2


= 14.00 x 1.66 x 2.00 = 46.48
= 7.15 x 1.66 x 2.00 = 23.74
= 6.48 x 1.66 x 2.00 = 21.51
= 14.00 x 1.05 x 2.00 = 29.40
kolom = 1.57 x 3.50 x 6.00 = 32.97
= 1.57 x 7.50 x 12.00 = 141.30
9 Pek. Pas. Batu Alam Palimanan Dinding Taman = 190.23 190.23 m2

10 Pek. Pas. Batu Alam Palimanan Ornamen Kolom Panjang x Jumlah


= 4.40 x 11.00 = 48.40 48.40 m2

II PEKERJAAN LANTAI DAN PLAFOND


1 Pek. Pas. Lantai Keramik 60x60cm (Anti Slip) Panjang x Lebar 283.11 m2
= 19.65 x 6.10 = 119.87
= 14.85 x 2.40 = 35.64
= 22.00 x 5.80 = 127.60

2 Pek. Pas. Lantai Keramik 60x60cm Panjang x Lebar 1,390.56 m2


= 9.00 x 12.00 = 108.00
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
= 18.00 x 12.00 = 216.00
= 9.50 x 12.00 = 114.00
= 6.00 x 6.00 = 36.00
= 2.00 x 3.00 = 6.00
= 28.50 x 6.00 = 171.00
= 22.00 x 18.00 = 396.00
= 6.00 x 6.50 = 39.00
= 6.00 x 30.50 = 183.00

= 16.00 x 2.75 = 44.00


= 16.00 x 5.50 = 88.00
= Pengurangan Kolom 29 bh = 10.44

3 Pek. Pas. Lantai Keramik Tangga Panjang x Lebar 110.15 m2


= 6.00 x 5.50 = 33.00
= 32.30 x 1.65 = 53.30
= 15.90 x 1.50 = 23.85

4 Pek. Pas. Plint Keramik 15x60cm Panjang 467.62 m'


= 15.800 = 15.80
= 61.100 = 61.10
= 16.700 = 16.70
= 34.850 = 34.85
= 52.070 = 52.07
= 85.550 = 85.55
= 165.848 = 165.85
= 18.850 = 18.85
= 10.850 = 10.85
= 6.000 = 6.00

5 Pek. Pas. Lantai Keramik 30x30cm Panjang x Lebar 38.63 m2


= 3.50 x 3.00 = 10.50
= 3.00 x 3.50 = 10.50
= 3.65 x 1.50 = 5.48
= 3.55 x 3.00 = 10.65
= 1.00 x 1.50 = 1.50

6 Pek. Pas. Lantai Keramik KM/WC 20x20cm Panjang x Lebar 15.50 m2


NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
= 2.25 x 3.00 = 6.75
= 1.50 x 1.75 = 2.63
= 3.06 x 2.00 = 6.13

7 Pek. Pas. Keramik Dinding KM/WC 20x40cm Panjang x Tinggi 152.24 m2


= 20.88 x 1.80 = 37.58
= 15.08 x 1.80 = 27.14
= 16.20 x 1.80 = 29.16
= 5.55 x 1.80 = 9.99
= 5.90 x 1.80 = 10.62
= 12.80 x 1.80 = 23.04
Tempat Wudhu = 8.17 1.80 14.71

8 Pek. Rangka Plafond Besi Hollow Luas 1,684.63 m2


= 15.71 = 15.71
= 9.72 = 9.72
= 8.92 = 8.92
= 9.10 = 9.10
= 13.70 = 13.70
= 8.92 = 8.92
= 19.49 = 19.49
= 162.18 = 162.18
= 14.42 = 14.42
= 10.92 = 10.92
= 526.97 = 526.97
= 242.30 = 242.30
= 128.60 = 128.60
= 77.18 = 77.18
= 82.50 = 82.50
= 5.00 = 5.00
= 83.16 = 83.16
drop off belakang tambahan = 240.88 = 240.88
tritisan = 50.01 = 50.01
pengurangan kolom= 25.05

9 Pek. Plafond Gypsumboard t=9mm = 1,684.63 1,684.63 m2


NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
10 Pek. List Plafond Gypsum 10cm = 625.50 625.50 m'

III PEKERJAAN DINDING PARTISI


1 Pek. Kusen Dinding Partisi Aluminium 4" Panjang x Jumlah 515.77 m'
A1 = 64.90 x 1.00 = 64.90
A2 = 29.40 x 1.00 = 29.40
A3 = 55.45 x 1.00 = 55.45
A4 = 13.60 x 1.00 = 13.60
B1 = 64.90 x 1.00 = 64.90
B2 = 29.40 x 1.00 = 29.40
B3 = 53.40 x 1.00 = 53.40
B4 = 24.55 x 1.00 = 24.55
C1 = 53.40 x 1.00 = 53.40
D1 = 31.71 x 2.00 = 63.42
D2 = 63.35 x 1.00 = 63.35

2 Pek. Daun Pintu Kaca Aluminium Panjang x Lebar x Tinggi 24.96 m2


A1 = 0.80 x 2.00 x 2.40 = 3.84
A3 = 0.80 x 2.00 x 2.40 = 3.84
B1 = 0.80 x 2.00 x 2.40 = 3.84
B3 = 0.80 x 2.00 x 2.40 = 3.84
C1 = 0.80 x 2.00 x 2.40 = 3.84
D2 = 0.80 x 3.00 x 2.40 = 5.76

3 Pek. Kaca Polos 5mm Panjang x Lebar x Jumlah 177.55 m2


A1 = 4.00 x 2.40 x 1.00 = 9.60
= 2.86 x 2.40 x 1.00 = 6.86
= 8.46 x 0.57 x 1.00 = 4.82
A2 = 3.40 x 2.97 x 1.00 = 10.10
A3 = 5.71 x 2.40 x 1.00 = 13.70
A4 = 3.40 x 2.97 x 1.00 = 10.10
= 7.31 x 0.57 x 1.00 = 4.17
B1 = 4.00 x 2.40 x 1.00 = 9.60
= 2.86 x 2.40 x 1.00 = 6.86
= 8.46 x 0.57 x 1.00 = 4.82
B2 = 3.40 x 2.97 x 1.00 = 10.10
B3 = 5.20 x 2.40 x 1.00 = 12.48
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
= 6.80 x 0.57 x 1.00 = 3.88
B4 = 2.92 x 2.97 x 1.00 = 8.67
C1 = 5.20 x 2.40 x 1.00 = 12.48
= 6.80 x 0.57 x 1.00 = 3.88
D1 = 4.23 x 2.97 x 2.00 = 25.13
D2 = 6.53 x 2.40 x 1.00 = 15.67
= 8.13 x 0.57 x 1.00 = 4.63

4 Pek. Kunci Pintu Jumlah 12.00 bh


A1 = 2.00 x 1.00 = 2.00
A3 = 2.00 x 1.00 = 2.00
B1 = 2.00 x 1.00 = 2.00
B3 = 2.00 x 1.00 = 2.00
C1 = 1.00 x 1.00 = 1.00
D2 = 3.00 x 1.00 = 3.00

5 Pek. Engsel Pintu Jumlah 36.00 bh


A1 = 6.00 x 1.00 = 6.00
A3 = 6.00 x 1.00 = 6.00
B1 = 6.00 x 1.00 = 6.00

B3 = 6.00 x 1.00 = 6.00


C1 = 3.00 x 1.00 = 3.00
D2 = 9.00 x 1.00 = 9.00

6 Pek. Doorcloser = Volume Kunci Pintu = 12.00 12.00 bh

7 Pek. Cuting Sticker (Motif Sandblast) Panjang x Lebar x Jumlah 53.59 m2


A1 = 6.86 x 0.90 x 1.00 = 6.17
A2 = 3.40 x 0.90 x 1.00 = 3.06
A3 = 5.71 x 0.90 x 1.00 = 5.14
A4 = 3.40 x 0.90 x 1.00 = 3.06
B1 = 6.86 x 0.90 x 1.00 = 6.17
B2 = 3.40 x 0.90 x 1.00 = 3.06
B3 = 5.20 x 0.90 x 1.00 = 4.68
B4 = 2.92 x 0.90 x 1.00 = 2.63
C1 = 5.20 x 0.90 x 1.00 = 4.68
D1 = 4.23 x 0.90 x 2.00 = 7.61
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
D2 = 8.13 x 0.90 x 1.00 = 7.32

IV PEKERJAAN ALLUMINIUM COMPOSITE PANEL


1 Pek. Alluminium Composite Panel + Rangka 668.35 m2

2 Pek. Logo Kab. Lombok Timur uk.55x70cm' (Acrylik) = 1.00 1.00 bh


3 Pek. Letter Set Stainlessteel t=34cm' (Type Arial Bolt) = 4.00 4.00 bh
4 Pek. Letter Set Stainlessteel t=17 & 23cm' (Type Arial Bolt) = 47.00 47.00 bh

V PEKERJAAN BETON
1 Pek. Kolom Beton K.4 = 50x50cm, K.250 Panjang x Lebar x Tinggi x Jumlah 55.46 m3
= 0.50 x 0.50 x 4.35 x 51.00 = 55.46

2 Pek. Kolom Beton K.8 = 30x30cm, K.250 Panjang x Lebar x Tinggi x Jumlah 2.35 m3
= 0.30 x 0.30 x 4.35 x 6.00 = 2.35

3 Pek. Kolom Beton K.9 = 25x25cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.96 m3

= 0.25 x 0.25 x 7.70 x 2.00 = 0.96

4 Pek. Kolom Beton K.10 = 15x45cm, K.250 Panjang x Lebar x Tinggi x Jumlah 1.17 m3
= 0.15 x 0.45 x 4.35 x 4.00 = 1.17

5 Pek. Kolom Beton K.11 = dia.50cm, K.250 Panjang x Lebar x Tinggi x Jumlah 13.67 m3
= 0.50 x 0.20 x 4.35 x 16.00 = 13.67

6 Pek. Kolom Beton K.12 = dia.50cm, K.250 Dia x Luas Selimut x Tinggi x Jumlah 8.99 m3
= 0.50 x 0.20 x 4.35 x 4.00 = 3.42
= 0.50 x 0.20 x 7.10 x 4.00 = 5.58

7 Pek. Kolom Beton Praktis KP.1 =13x13cm, K.250 Panjang x Lebar x Tinggi x Jumlah 7.65 m3
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
= 0.13 x 0.13 x 4.35 x 104.00 = 7.65

8 Pek. Balok Beton B.1 = 25x75cm, K.250 Panjang x Lebar x Tinggi x Jumlah 3.15 m3
= 16.80 x 0.25 x 0.75 x 1.00 = 3.15

9 Pek. Balok Beton B.2 = 25x75cm, K.250 Panjang x Lebar x Tinggi x Jumlah 4.44 m3
= 23.66 x 0.25 x 0.75 x 1.00 = 4.44

10 Pek. Balok Beton B.3 = 25x60cm, K.250 Panjang x Lebar x Tinggi x Jumlah 17.33 m3
= 115.50 x 0.25 x 0.60 x 1.00 = 17.33

11 Pek. Balok Beton B.4 = 25x60cm, K.250 Panjang x Lebar x Tinggi x Jumlah 15.62 m3
= 104.16 x 0.25 x 0.60 x 1.00 = 15.62

12 Pek. Balok Beton B.5 = 25x60cm, K.250 Panjang x Lebar x Tinggi x Jumlah 9.75 m3
= 65.00 x 0.25 x 0.60 x 1.00 = 9.75

13 Pek. Balok Beton B.6 = 25x50cm, K.250 Panjang x Lebar x Tinggi x Jumlah 3.59 m3
= 28.70 x 0.25 x 0.50 x 1.00 = 3.59

14 Pek. Balok Beton B.7 = 25x50cm, K.250 Panjang x Lebar x Tinggi x Jumlah 4.75 m3
= 38.00 x 0.25 x 0.50 x 1.00 = 4.75

15 Pek. Balok Beton B.8 = 25x50cm, K.250 Panjang x Lebar x Tinggi x Jumlah 3.35 m3
= 26.76 x 0.25 x 0.50 x 1.00 = 3.35

16 Pek. Balok Beton B.9 = 25x50cm, K.250 Panjang x Lebar x Tinggi x Jumlah 1.43 m3
= 11.46 x 0.25 x 0.50 x 1.00 = 1.43

17 Pek. Balok Beton B.10 = 25x60cm, K.250 Panjang x Lebar x Tinggi x Jumlah 7.40 m3
= 49.30 x 0.25 x 0.60 x 1.00 = 7.40

18 Pek. Balok Beton B.12 = 25x50cm, K.250 Panjang x Lebar x Tinggi x Jumlah 8.04 m3
= 64.28 x 0.25 x 0.50 x 1.00 = 8.04

19 Pek. Balok Beton B.13 = 25x50cm, K.250 Panjang x Lebar x Tinggi x Jumlah 12.24 m3
= 97.90 x 0.25 x 0.50 x 1.00 = 12.24
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
20 Pek. Balok Beton B.14 = 25x50cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.68 m3
= 5.40 x 0.25 x 0.50 x 1.00 = 0.68

21 Pek. Balok Beton B.16 = 20x45cm, K.250 Panjang x Lebar x Tinggi x Jumlah 19.50 m3
= 216.71 x 0.20 x 0.45 x 1.00 = 19.50

22 Pek. Balok Beton B.17 = 20x45cm, K.250 Panjang x Lebar x Tinggi x Jumlah 7.40 m3
= 82.23 x 0.20 x 0.45 x 1.00 = 7.40

23 Pek. Balok Beton B.20 = 20x40cm, K.250 Panjang x Lebar x Tinggi x Jumlah 2.69 m3
= 33.60 x 0.20 x 0.40 x 1.00 = 2.69

24 Pek. Balok Beton B.22 = 15x30cm, K.250 Panjang x Lebar x Tinggi x Jumlah 5.86 m3
= 130.25 x 0.15 x 0.30 x 1.00 = 5.86

25 Pek. Balok Beton BP = 15x25cm, K.250 Panjang x Lebar x Tinggi x Jumlah 2.94 m3
= 78.41 x 0.15 x 0.25 x 1.00 = 2.94

26 Pek. Balok Praktis = 15x25cm, K.250 Panjang x Lebar x Tinggi x Jumlah 2.06 m3
= 55.00 x 0.15 x 0.25 x 1.00 = 2.06

27 Pek. Balok Bordes Tangga = 15x25cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.99 m3
= 26.40 x 0.15 x 0.25 x 1.00 = 0.99

28 Pek. Plat Lantai Beton t=12cm, K.250 ( Elv +4,35) Luas x Tebal x Jumlah 193.17 m3
elevasi +4,35 = 1.71 x 0.12 x 14.00 = 2.88
= 1.87 x 0.12 x 6.00 = 1.35
= 18.74 x 0.12 x 6.00 = 13.49
= 15.64 x 0.12 x 2.00 = 3.75
= 17.19 x 0.12 x 17.00 = 35.06
= 15.68 x 0.12 x 9.00 = 16.93
= 4.71 x 0.12 x 2.00 = 1.13

= 5.57 x 0.12 x 1.00 = 0.67


= 18.66 x 0.12 x 34.00 = 76.14
= 12.68 x 0.12 x 16.00 = 24.34
= 13.93 x 0.12 x 1.00 = 1.67
= 2.57 x 0.12 x 2.00 = 0.62
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
= 2.21 x 0.12 x 2.00 = 0.53
= 5.05 x 0.12 x 2.00 = 1.21
= 4.92 x 0.12 x 2.00 = 1.18
= 11.38 x 0.12 x 2.00 = 2.73
= 6.51 x 0.12 x 2.00 = 1.56
= 10.09 x 0.12 x 1.00 = 1.21
= 23.13 x 0.12 x 1.00 = 2.78
= 13.30 x 0.12 x 1.00 = 1.60
elevasi +4,85 = 9.95 x 0.12 x 2.00 = 2.39
= 9.85 x 0.12 x 2.00 = 2.36
= 7.73 x 0.12 x 2.00 = 1.86
= 3.44 x 0.12 x 1.00 = 0.41
Pengurangan As 7-8,DE = 39.00 x 0.12 x 1.00 = 4.68

29 Pek. Plat Tangga Beton t=15cm, K.250 Panjang x Lebar x Tinggi x Jumlah 6.68 m3
= 9.90 x 1.50 x 0.15 x 3.00 = 6.68

30 Pek. Plat Sunscreen Beton t=7cm, K.250 Panjang x Lebar x Tinggi x Jumlah 4.79 m3
= 7.80 x 4.00 0.07 x 2.00 = 4.37
= 1.50 x 4.00 0.07 x 1.00 0.42

31 Pek. Listplank Beton t=7cm, K.250 Panjang x Lebar x Tinggi x Jumlah 8.25 m3
= 196.40 x 0.60 x 0.07 x 1.00 = 8.25

VI PEKERJAAN KAYU
1 Pek. Kusen Kayu, Klas I Panjang x Lebar x Tinggi x Jumlah 4.68 m3
PJ.1 = 17.90 x 0.05 x 0.13 x 1.00 = 0.12
PJ.2 = 17.90 x 0.05 x 0.13 x 1.00 = 0.12
PJ.3 = 20.65 x 0.05 x 0.13 x 2.00 = 0.27
P.1 = 10.15 x 0.05 x 0.13 x 9.00 = 0.59
P.2 = 7.90 x 0.05 x 0.13 x 3.00 = 0.15
P5 = 4.90 x 0.05 x 0.13 x 8.00 = 0.25
J.1 = 18.50 x 0.05 x 0.13 x 2.00 = 0.24
J.2 = 11.25 x 0.05 x 0.13 x 34.00 = 2.49
J.6 = 63.00 x 0.05 x 0.13 x 1.00 = 0.41
V.1 = 2.90 x 0.05 x 0.13 x 2.00 = 0.04

2 Pek. Daun Pintu Panil + Kaca 5mm, Klas II Panjang x Lebar x Jumlah 49.92 m2
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
PJ.1 = 1.60 x 2.40 x 1.00 = 3.84
PJ.2 = 1.60 x 2.40 x 1.00 = 3.84
PJ.3 = 1.60 x 2.40 x 2.00 = 7.68
P.1 = 1.60 x 2.40 x 9.00 = 34.56

3 Pek. Daun Pintu Panil, Klas II Panjang x Lebar x Jumlah


P.2 = 0.80 x 2.40 x 3.00 = 5.76 5.76 m2

4 Pek. Daun Pintu Tripleks Lapis Alluminium Panjang x Lebar x Jumlah


P.5 = 0.70 x 2.00 x 8.00 = 11.20 11.20 m2

5 Pek. Daun Jendela Kaca 5mm + Ventilasi, Klas II Panjang x Lebar Jumlah 114.65 m2
PJ.1 = 2.40 x 0.55 1.00 = 1.32
PJ.2 = 2.40 x 0.55 1.00 = 1.32
PJ.3 = 1.60 x 0.55 2.00 = 1.76
P.1 = 1.60 x 0.55 9.00 = 7.92
P.2 = 0.80 x 0.55 3.00 = 1.32
J.1 = 0.95 x 0.55 2.00 = 1.05
J.2 = 1.40 x 2.10 34.00 = 99.96

6 Pek. Ventilasi Krepyak Panjang x Lebar Jumlah


J.6 = 0.45 x 10.85 1.00 = 4.88 4.88 m2

7 Pek. Kaca Mati 5mm Panjang x Lebar Jumlah 32.52 m2


PJ.1 = 0.80 x 1.95 1.00 = 1.56
PJ.2 = 0.80 x 1.95 1.00 = 1.56
PJ.3 = 0.90 x 1.95 2.00 = 3.51
J.1 = 1.90 x 1.95 2.00 = 7.41
J.6 = 1.60 x 10.85 1.00 = 17.36
V.1 = 0.70 x 0.80 2.00 = 1.12

8 Pek. List GRC Kusen Pintu Dan Jendela Panjang Jumlah 346.60 m'
PJ.1 = 9.90 x 1.00 = 9.90
PJ.2 = 9.90 x 1.00 = 9.90
PJ.3 = 10.20 x 2.00 = 20.40
J.1 = 10.40 x 2.00 = 20.80
J.2 = 8.40 x 34.00 = 285.60

VII PEKERJAAN PENGUNCI DAN PENGGANTUNG


NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
1 Pek. Handle Pintu Double Jumlah 26.00 bh

PJ.1 = 2.00 = 2.00


PJ.2 = 2.00 = 2.00
PJ.3 = 4.00 = 4.00
P.1 = 18.00 = 18.00

2 Pek. Kunci Pintu Mutu Tinggi Jumlah 24.00 bh


PJ.1 = 1.00 = 1.00
PJ.2 = 1.00 = 1.00
PJ.3 = 2.00 = 2.00
P.1 = 9.00 = 9.00
P.2 = 3.00 = 3.00
P5 = 8.00 = 8.00

3 Pek. Engsel Pintu Jumlah 111.00 bh


PJ.1 = 6.00 = 6.00
PJ.2 = 6.00 = 6.00
PJ.3 = 12.00 = 12.00
P.1 = 54.00 = 54.00
P.2 = 9.00 = 9.00
P5 = 24.00 = 24.00

4 Pek. Engsel Jendela Dan Ventilasi Jumlah 342.00 bh


PJ.1 = 6.00 = 6.00
PJ.2 = 6.00 = 6.00
PJ.3 = 8.00 = 8.00
P.1 = 36.00 = 36.00
P.2 = 6.00 = 6.00
J.1 = 8.00 = 8.00
J.2 = 272.00 = 272.00

5 Pek. Grendel Pintu Jumlah 37.00 bh


PJ.1 = 2.00 = 2.00
PJ.2 = 2.00 = 2.00
PJ.3 = 4.00 = 4.00
P.1 = 18.00 = 18.00
P.2 = 3.00 = 3.00
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
P5 = 8.00 = 8.00

6 Pek. Grendel Jendela Dan Ventilasi Jumlah 239.00 bh


PJ.1 = 3.00 = 3.00
PJ.2 = 3.00 = 3.00

PJ.3 = 4.00 = 4.00


P.1 = 18.00 = 18.00
P.2 = 3.00 = 3.00
J.1 = 4.00 = 4.00
J.2 = 204.00 = 204.00

7 Pek. Expagolet Jumlah 26.00 bh


PJ.1 = 2.00 = 2.00
PJ.2 = 2.00 = 2.00
PJ.3 = 4.00 = 4.00
P.1 = 18.00 = 18.00

8 Pek. Hak Angin Jendela Dan Ventilasi Jumlah 342.00 bh


PJ.1 = 6.00 = 6.00
PJ.2 = 6.00 = 6.00
PJ.3 = 8.00 = 8.00
P.1 = 36.00 = 36.00
P.2 = 6.00 = 6.00
J.1 = 8.00 = 8.00
J.2 = 272.00 = 272.00

9 Pek. Angker Kusen Jumlah 424.00 bh


PJ.1 = 8.00 = 8.00
PJ.2 = 8.00 = 8.00
PJ.3 = 16.00 = 16.00
P.1 = 72.00 = 72.00
P.2 = 24.00 = 24.00
P5 = 48.00 = 48.00
J.1 = 12.00 = 12.00
J.2 = 204.00 = 204.00
J.6 = 28.00 = 28.00
V.1 = 4.00 = 4.00
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5

10 Pek. Relling Stainlessteel Panjang x Lebar x Jumlah


29.70 m2
= 5.50 x 0.90 x 6.00 29.70

VIII PEKERJAAN PENGECATAN


1 Pek. Cat Kayu Panjang x Lebar x Jumlah 324.55 m2
PJ.1 = 17.90 x 0.36 x 1.00 = 6.44

PJ.2 = 17.90 x 0.36 x 1.00 = 6.44


PJ.3 = 20.65 x 0.36 x 2.00 = 14.87
P.1 = 10.15 x 0.36 x 9.00 = 32.89
P.2 = 7.90 x 0.36 x 3.00 = 8.53
P5 = 4.90 x 0.36 x 8.00 = 14.11
J.1 = 18.50 x 0.36 x 2.00 = 13.32
J.2 = 11.25 x 0.36 x 34.00 = 137.70
J.6 = 63.00 x 0.36 x 1.00 = 22.68
V.1 = 2.90 x 0.36 x 2.00 = 2.09
PJ.1 = 1.60 x 2.40 x 1.00 = 3.84
PJ.2 = 1.60 x 2.40 x 1.00 = 3.84
PJ.3 = 1.60 x 2.40 x 2.00 = 7.68
P.1 = 1.60 x 2.40 x 9.00 = 34.56
P.2 = 0.80 x 2.40 x 3.00 = 5.76
P5 = 0.70 x 2.00 x 7.00 = 9.80

2 Pek. Cat Dinding Tembok Volume Pek. Acian = 3,071.06 3,071.06 m2

3 Pek. Cat Plafond Volume Pek. Plafond = 1,684.63 1,684.63 m2

PEKERJAAN LANTAI 2 (DUA)


I PEKERJAAN PASANGAN DAN PLESTERAN
1 Pek. Pas. Dinding Trassram 1/2Bt. Camp.1PC:3PS Panjang x Tinggi
= 55.04 x 3.85 = 211.90 211.90 m2

2 Pek. Pas. Dinding Bata 1/2Bt. Camp.1PC:5PS Panjang x Tinggi 1,410.24 m2


Pas. Dinding Bata 1/2Bt. (horisontal) = 223.60 x 3.85 = 860.86
Pas. Dinding Bata 1/2Bt. (vertikal) = 213.30 x 3.85 = 821.21
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
= 1,682.07
PENGURANGAN Panjang x Tinggi x Jumlah
PJ.4 = 3.40 x 3.05 x 1.00 = 10.37
P.1 = 1.70 x 3.05 x 16.00 = 82.96
P.2 = 0.90 x 3.05 x 3.00 = 8.24
P5 = 0.80 x 2.05 x 4.00 = 6.56
J.2 = 1.55 x 2.20 x 40.00 = 136.40
J.3 = 1.05 x 2.60 x 2.00 = 5.46
J.4 = 2.05 x 2.60 x 4.00 = 21.32
V.1 = 0.80 x 0.65 x 1.00 = 0.52
= 271.83

3 Pek. Plesteran Trassram Bata, Camp.1PC:3PS Volume Pas. Dinding Trassram = 211.90 211.90 m2

4 Pek. Plesteran Dinding Bata, Camp.1PC:5PS Volume Pas. Dinding Bata x 2.00 = 2,820.48 2,820.48 m2

5 Pek. Plesteran Kolom Beton, Camp.1PC:5PS Panjang x Tinggi x Jumlah 434.67 m2


K4 = 2.00 x 3.75 x 51.00 = 382.50
K8 = 1.20 x 3.75 x 2.00 = 9.00
K9 = 1.00 x 3.75 x 2.00 = 7.50
K10 = 1.20 x 3.75 x 4.00 = 18.00
K11 = 0.20 x 3.75 x 16.00 = 11.78
K12 = 0.20 x 3.75 x 8.00 = 5.89

5a Pek. Plesteran Balok Beton, Camp.1PC:5PS Panjang x Tinggi x Jumlah 182.38 m2


B5 = 5.40 x 0.60 x 9.00 = 29.16
B9 = 5.40 x 0.50 x 1.00 = 2.70
B13 = 16.70 x 0.50 x 1.00 = 8.35
B7 = 10.80 x 0.50 x 1.00 = 5.40
B12 = 6.00 x 0.50 x 8.00 = 24.00
B8 = 13.35 x 0.50 x 1.00 = 6.68
B14 = 5.40 x 0.50 x 1.00 = 2.70
B22 = 66.50 x 0.30 x 2.00 = 39.90
Plat tangga = 5.63 x 1.50 x 3.00 = 25.34
Plat tangga = 1.50 x 2.85 x 3.00 = 12.83
Plat tangga = 5.63 x 1.50 x 3.00 = 25.34

6 Pek. Acian Volume Plesteran = 3,649.43 3,649.43 m2


NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5

II PEKERJAAN LANTAI DAN PLAFOND


1 Pek. Pas. Lantai Keramik 60x60cm Panjang x Lebar 1,527.00 m2
= 6.00 x 43.00 = 258.00
= 9.00 x 12.00 = 108.00
= 18.00 x 12.00 = 216.00
= 9.50 x 12.00 = 114.00
= 6.00 x 6.00 = 36.00
= 2.00 x 3.00 = 6.00
= 28.50 x 6.00 = 171.00
= 22.00 x 18.00 = 396.00
= 6.00 x 6.50 = 39.00
= 6.00 x 30.50 = 183.00

2 Pek. Pas. Lantai Keramik Tangga Panjang x Lebar 110.15 m2


= 6.00 5.50 = 33.00
= 32.30 1.65 = 53.30

= 15.90 1.50 = 23.85

3 Pek. Pas. Plint Keramik 15x60cm Panjang = 804.10 804.10 m'

4 Pek. Pas. Lantai Keramik 30x30cm Panjang x Lebar 38.63 m2


= 3.50 x 3.00 = 10.50
= 3.00 x 3.50 = 10.50
= 3.65 x 1.50 = 5.48
= 3.55 x 3.00 = 10.65
= 1.00 x 1.50 = 1.50

5 Pek. Pas. Lantai Keramik KM/WC 20x20cm Panjang x Lebar x Jumlah 9.15 m2
= 1.50 x 1.50 x 3.00 = 6.75
= 1.50 x 1.60 x 1.00 = 2.40

6 Pek. Pas. Keramik Dinding KM/WC 20x40cm Panjang x Tinggi x Jumlah 128.29 m2
= 5.20 x 1.80 x 3.00 = 28.08
= 5.70 x 1.80 x 1.00 = 10.26
= 6.15 x 1.80 x 2.00 = 22.14
= 12.05 x 1.80 x 1.00 = 21.69
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
= 17.45 x 1.80 x 1.00 = 31.41
Tmpat Wudu' = 8.17 x 1.80 x 1.00 = 14.71

7 Pek. Rangka Plafond Besi Hollow Luas 1,725.82 m2


= 55.93 = 55.93
= 55.84 = 55.84
= 48.53 = 48.53
= 51.42 = 51.42
= 34.05 = 34.05
= 13.24 = 13.24
= 34.02 = 34.02
= 12.33 = 12.33
= 10.92 = 10.92
= 1.82 = 1.82
= 2.16 = 2.16
= 16.24 = 16.24
= 10.08 = 10.08
= 14.41 = 14.41
= 3.64 = 3.64
= 36.85 = 36.85
= 37.01 = 37.01
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5

= 48.05 = 48.05
= 221.46 = 221.46
= 95.64 = 95.64
= 865.00 = 865.00
tritisan = 62.58 = 62.58
pengurangan kolom = 5.40

8 Pek. Plafond Gypsumboard t=9mm Volume Rangka Plafond = 1,725.82 1,725.82 m2

9 Pek. List Plafond Gypsum 10cm Panjang = 974.85 974.85 m'

III PEKERJAAN BETON


1 Pek. Kolom Beton K.5 = 50x50cm, K.250 Panjang x Lebar x Tinggi x Jumlah 55.46 m3
= 0.50 0.50 4.35 51.00 = 55.46

2 Pek. Kolom Beton K.9 = 25x25cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.54 m3
= 0.25 0.25 4.35 2.00 = 0.54

3 Pek. Kolom Beton K.10 = 15x45cm, K.250 Panjang x Lebar x Tinggi x Jumlah 1.17 m3
= 0.15 0.45 4.35 4.00 = 1.17

4 Pek. Kolom Beton K.12 = dia.50cm, K.250 Dia x Luas Selimut x Tinggi x Jumlah 11.95 m3
= 0.50 0.20 4.35 14.00 = 11.95

5 Pek. Kolom Beton Praktis KP.1 =13x13cm, K.250 Panjang x Lebar x Tinggi x Jumlah 7.65 m3
= 0.13 0.13 4.35 104.00 = 7.65

6 Pek. Kolom Beton Praktis KP.2 = 15x30cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.39 m3
= 0.15 0.30 4.35 2.00 = 0.39

7 Pek. Kolom Beton K.8 = 30x30cm, K.250 Panjang x Lebar x Tinggi x Jumlah 1.57 m3
= 0.30 x 0.30 x 4.35 x 4.00 = 1.57

7 Pek. Balok Beton B.1 = 25x75cm, K.250 Panjang x Lebar x Tinggi x Jumlah 4.13 m3
Elv. 10.10 = 22.00 0.25 0.75 1.00 = 4.13

8 Pek. Balok Beton B.2 = 25x75cm, K.250 Panjang x Lebar x Tinggi x Jumlah 1.13 m3
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
Elv. 10.10 = 3.00 0.25 0.75 2.00 = 1.13

9 Pek. Balok Beton B.3 = 25x60cm, K.250 Panjang x Lebar x Tinggi x Jumlah 20.36 m3
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5

Elv. 10.10 = 135.70 0.25 0.60 1.00 = 20.36

10 Pek. Balok Beton B.4 = 25x60cm, K.250 Panjang x Lebar x Tinggi x Jumlah 3.30 m3
Elv. 10.10 = 22.00 0.25 0.60 1.00 = 3.30

11 Pek. Balok Beton B.5 = 25x60cm, K.250 Panjang x Lebar x Tinggi x Jumlah 15.68 m3
Elv. 10.10 = 104.50 0.25 0.60 1.00 = 15.68

12 Pek. Balok Beton B.7 = 25x50cm, K.250 Panjang x Lebar x Tinggi x Jumlah 1.28 m3
Elv. 10.10 = 10.26 0.25 0.50 1.00 = 1.28

13 Pek. Balok Beton B.9 = 25x50cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.69 m3
Elv. 10.10 = 5.50 0.25 0.50 1.00 = 0.69

14 Pek. Balok Beton B.12 = 25x50cm, K.250 Panjang x Lebar x Tinggi x Jumlah 15.48 m3
Elv. 10.10 = 123.80 0.25 0.50 1.00 = 15.48

15 Pek. Balok Beton B.13 = 25x50cm, K.250 Panjang x Lebar x Tinggi x Jumlah 25.05 m3
Elv. 10.10 = 200.40 0.25 0.50 1.00 = 25.05

16 Pek. Balok Beton B.14 = 25x50cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.68 m3
Elv. 10.10 = 5.40 0.25 0.50 1.00 = 0.68

17 Pek. Balok Beton B.16 = 20x45cm, K.250 Panjang x Lebar x Tinggi x Jumlah 10.73 m3
Elv. 10.10 = 119.27 0.20 0.45 1.00 = 10.73

18 Pek. Balok Beton B.17 = 20x45cm, K.250 Panjang x Lebar x Tinggi x Jumlah 15.42 m3
Elv. 10.10 = 171.37 0.20 0.45 1.00 = 15.42

19 Pek. Balok Beton B.20 = 20x40cm, K.250 Panjang x Lebar x Tinggi x Jumlah 4.33 m3
Elv. 10.10 = 54.16 0.20 0.40 1.00 = 4.33

20 Pek. Balok Beton B.22 = 15x30cm, K.250 Panjang x Lebar x Tinggi x Jumlah 7.95 m3
Elv. 10.10 = 176.60 0.15 0.30 1.00 = 7.95

20a Pek. Balok Beton B.21 = 20x35cm, K.250 Panjang x Lebar x Tinggi x Jumlah 7.70 m3
di lumbung = 44.00 0.25 0.35 2.00 = 7.70
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
21 Pek. Balok Beton BM.1 = 25x60cm, K.250 Panjang x Lebar x Tinggi x Jumlah 1.41 m3
Elv. 10.10 = 9.41 0.25 0.60 1.00 = 1.41

22 Pek. Balok Beton BP = 15x25cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.67 m3
Elv. 10.10 = 9.41 0.15 0.25 1.00 = 0.35
di lumbung = 2.12 0.15 0.25 4.00 = 0.32

23 Pek. Balok Bordes Tangga = 15x25cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.99 m3
Elv. 10.10 = 26.40 0.15 0.25 1.00 = 0.99

23a Pek. Plat Beton t = 12 cm Panjang x Lebar x Tinggi x Jumlah 8.81 m3


di area lumbung = 16.83 2.18 0.12 2.00 = 8.81

24 Pek. Plat Lantai Beton t=12cm, K.250 Luas x Tebal x Jumlah 180.22 m3
Elv. 10.10 = 3.33 x 0.12 x 15.00 = 6.00
= 1.78 x 0.12 x 10.00 = 2.13
= 28.36 x 0.12 x 1.00 = 3.40
= 25.61 x 0.12 x 1.00 = 3.07
= 16.31 x 0.12 x 17.00 = 33.27
= 14.87 x 0.12 x 28.00 = 49.97
= 4.47 x 0.12 x 2.00 = 1.07
= 5.28 x 0.12 x 1.00 = 0.63
= 17.74 x 0.12 x 35.00 = 74.52
= 13.21 x 0.12 x 1.00 = 1.59
= 2.44 x 0.12 x 2.00 = 0.59
= 7.00 x 0.12 x 2.00 = 1.68
= 9.57 x 0.12 x 2.00 = 2.30

25 Pek. Plat Lantai Beton Ruang Sidang t=15cm, K.250 Panjang x Tinggi x Jumlah 35.60 m3
Elv. 10.10 = 6.29 0.15 2.00 = 1.89
= 12.25 0.15 1.00 = 1.84
= 17.71 0.15 12.00 = 31.87

26 Pek. Plat Tangga Beton t=15cm, K.250 (Elv : 8,7) Panjang x Lebar x Tinggi x Jumlah 6.68 m3
Elv. 10.10 = 9.90 1.50 0.15 3.00 = 6.68

27 Pek. Listplank Beton t=7cm, K.250 Panjang x Lebar x Tinggi x Jumlah 8.25 m3
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
Elv. 10.10 = 196.40 x 0.60 x 0.07 x 1.00 = 8.25

IV PEKERJAAN KAYU
1 Pek. Kusen Kayu, Klas I Panjang lebar x Tinggi x Jumlah 4.81 m3
PJ4 = 23.30 0.050 x 0.13 x 1.00 = 0.15
P1 = 8.35 0.050 x 0.13 x 16.00 = 0.87
P2 = 6.20 0.050 x 0.13 x 3.00 = 0.12

P5 = 4.60 0.050 x 0.13 x 4.00 = 0.12


J2 = 10.80 0.050 x 0.13 x 40.00 = 2.81
J3 = 12.10 0.050 x 0.13 x 2.00 = 0.16
J4 = 13.70 0.050 x 0.13 x 4.00 = 0.36
J6 = 28.15 0.050 x 0.13 x 1.00 = 0.18
V1 = 2.70 0.136 x 0.13 x 1.00 = 0.05

2 Pek. Daun Pintu Panil + Kaca 5mm, Klas II Panjang x Lebar x x Jumlah 65.28 m2
PJ.4 = 1.60 x 2.40 x x 1.00 = 3.84
P.1 = 1.60 x 2.40 x x 16.00 = 61.44

3 Pek. Daun Pintu Panil, Klas II Panjang x Lebar x x Jumlah 5.76 m2


P.2 = 0.80 x 2.40 x x 3.00 = 5.76

4 Pek. Daun Pintu Tripleks Lapis Alluminium Panjang x Lebar x x Jumlah 5.60 m2
P5 = 0.70 x 2.00 x x 4.00 = 5.60

5 Pek. Daun Jendela Kaca 5mm + Ventilasi, Klas II Panjang x Lebar x x Jumlah 131.96 m2
PJ.4 = 3.20 x 0.55 x x 1.00 = 1.76
P.1 = 1.60 x 0.55 x x 16.00 = 14.08
P.2 = 0.80 x 0.55 x x 3.00 = 1.32
J.2 = 1.40 x 2.05 x x 40.00 = 114.80

6 Pek. Kaca Mati 5mm Panjang lebar x Jumlah 59.74 m2


PJ4 = 4.80 3.900 x 1.00 = 18.72
J3 = 0.95 2.450 x 2.00 = 4.66
J4 = 0.95 4.900 x 4.00 = 18.62
J6 = 0.80 21.700 x 1.00 = 17.36
V1 = 0.70 0.550 x 1.00 = 0.39
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5

7 Pek. List GRC Kusen Pintu Dan Jendela Panjang x Jumlah 311.25 m'
PJ.4 = 11.25 x 1.00 = 11.25
J.2 = 7.50 x 40.00 = 300.00

V PEKERJAAN PENGUNCI DAN PENGGANTUNG


1 Pek. Handle Pintu Double Jumlah 34.00 bh
PJ.4 = 2.00 = 2.00
P.1 = 32.00 = 32.00

2 Pek. Kunci Pintu Mutu Tinggi Jumlah 24.00 bh

PJ.4 = 1.00 = 1.00


P.1 = 16.00 = 16.00
P.2 = 3.00 = 3.00
P5 = 4.00 = 4.00

3 Pek. Engsel Pintu Jumlah 123.00 bh


PJ.4 = 6.00 = 6.00
P.1 = 96.00 = 96.00
P.2 = 9.00 = 9.00
P5 = 12.00 = 12.00

4 Pek. Engsel Jendela Dan Ventilasi Jumlah 398.00 bh


PJ.4 = 8.00 = 8.00
P.1 = 64.00 = 64.00
P.2 = 6.00 = 6.00
J.2 = 320.00 = 320.00

5 Pek. Grendel Pintu Jumlah 44.00 bh


PJ.4 = 2.00 = 2.00
P.1 = 32.00 = 32.00
P.2 = 6.00 = 6.00
P5 = 4.00 = 4.00

6 Pek. Grendel Jendela Dan Ventilasi Jumlah 279.00 bh


PJ.4 = 4.00 = 4.00
P.1 = 32.00 = 32.00
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
P.2 = 3.00 = 3.00
J.2 = 240.00 = 240.00

7 Pek. Expagolet Jumlah 34.00 bh


PJ.4 = 2.00 = 2.00
P.1 = 32.00 = 32.00

8 Pek. Hak Angin Jendela Dan Ventilasi Jumlah 398.00 bh


PJ.4 = 8.00 = 8.00
P.1 = 64.00 = 64.00
P.2 = 6.00 = 6.00
J.2 = 320.00 = 320.00

9 Pek. Angker Kusen Jumlah 466.00 bh


PJ.4 = 8.00 8.00 = 8.00

P.1 = 128.00 8.00 = 128.00


P.2 = 24.00 8.00 = 24.00
P5 = 24.00 6.00 = 24.00
J.2 = 240.00 6.00 = 240.00
J.3 = 12.00 6.00 = 12.00
J.4 = 24.00 6.00 = 24.00
V.1 = 2.00 2.00 = 2.00
J.6 = 4.00 1.00 = 4.00

10 Pek. Relling Stainlessteel Panjang x Lebar Jumlah 51.30 m2


R1 = 5.50 x 0.90 6.00 = 29.70
R2 = 5.90 x 0.90 2.00 = 10.62
R3 = 5.40 x 0.90 1.00 = 4.86
R = 3.40 x 0.90 2.00 = 6.12 tambahan

VI PEKERJAAN PENGECATAN
1 Pek. Cat Kayu Panjang x Lebar x Jumlah 346.28 m2
PJ.4 = 17.90 x 0.36 x 1.00 = 6.44
P.1 = 10.15 x 0.36 x 16.00 = 58.46
P.2 = 7.90 x 0.36 x 3.00 = 8.53
P5 = 4.90 x 0.36 x 4.00 = 7.06
J.2 = 11.25 x 0.36 x 40.00 = 162.00
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
J.3 = 8.35 x 0.36 x 2.00 = 6.01
J.4 = 13.95 x 0.36 x 4.00 = 20.09
V.1 = 2.90 x 0.36 x 1.00 = 1.04
PJ.4 = 1.60 x 2.40 x 1.00 = 3.84
P.1 = 1.60 x 2.40 x 16.00 = 61.44
P.2 = 0.80 x 2.40 x 3.00 = 5.76
P5 = 0.70 x 2.00 x 4.00 = 5.60

2 Pek. Cat Dinding Tembok Volume Pek. Acian = 3,649.43 3,649.43 m2

3 Pek. Cat Plafond Volume Pek. Plafond = 1,725.82 1,725.82 m2

PEKERJAAN LANTAI 3 (TIGA)


I PEKERJAAN PASANGAN DAN PLESTERAN
1 Pek. Pas. Dinding Trassram 1/2Bt. Camp.1PC:3PS Panjang x Tinggi
= 61.90 x 3.75 = 232.13 232.13 m2

2 Pek. Pas. Dinding Bata 1/2Bt. Camp.1PC:5PS Panjang x Tinggi 1,677.44 m2


Pas. Dinding Bata 1/2Bt. (horisontal) = 305.75 x 3.75 = 1,146.56

Pas. Dinding Bata 1/2Bt. (vertikal) = 218.55 x 3.75 = 819.56


= 1,966.13
PENGURANGAN Panjang x Tinggi x Jumlah
P.1 = 1.70 x 3.05 x 19.00 = 98.52
P.2 = 0.90 x 3.05 x 2.00 = 5.49
P5 = 0.80 x 2.05 x 8.00 = 13.12
J.2 = 1.55 x 2.20 x 18.00 = 61.38
J.3 = 1.05 x 2.60 x 2.00 = 5.46
J.4 = 2.05 x 2.60 x 4.00 = 21.32
J.5 = 1.55 x 2.20 x 24.00 = 81.84
V.1 = 0.80 x 0.65 x 3.00 = 1.56
= 288.69

3 Pek. Plesteran Trassram Bata, Camp.1PC:3PS Volume Pas. Dinding Trassram = 232.13 232.13 m2

4 Pek. Plesteran Dinding Bata, Camp.1PC:5PS Volume Pas. Dinding Bata x 2.00 = 3,354.88 3,354.88 m2

5 Pek. Plesteran Kolom Beton, Camp.1PC:5PS Panjang x Tinggi x Jumlah 369.00 m2


NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
K6 = 1.60 x 3.75 x 51.00 = 306.00
K9 = 1.00 x 3.75 x 12.00 = 45.00
K10 = 1.20 x 3.75 x 4.00 = 18.00

5a Pek. Plesteran Balok Beton, Camp.1PC:5PS Panjang x Tinggi x Jumlah 187.84 m2


B5 = 5.40 x 0.60 x 16.00 = 51.84
B13 = 5.40 x 0.50 x 5.00 = 13.50
B13 = 5.90 x 0.50 x 9.00 = 26.55
B13 = 4.90 x 0.50 x 2.00 = 4.90
B14 = 5.40 x 0.50 x 1.00 = 2.70
B22 = 14.25 x 0.30 x 2.00 = 8.55
B22 = 33.00 x 0.30 x 1.00 = 9.90
B20 = 16.00 x 0.40 x 1.00 = 6.40
Plat tangga = 5.63 x 1.50 x 3.00 = 25.34
Plat tangga = 1.50 x 2.85 x 3.00 = 12.83
Plat tangga = 5.63 x 1.50 x 3.00 = 25.34

6 Pek. Acian Volume Plesteran = 4,143.84 4,143.84 m2

II PEKERJAAN LANTAI DAN PLAFOND


1 Pek. Pas. Lantai Keramik 60x60cm Panjang x Lebar 1,527.00 m2
6.00 x 43.00 = 258.00
9.00 x 12.00 = 108.00

18.00 x 12.00 = 216.00


9.50 x 12.00 = 114.00
6.00 x 6.00 = 36.00
2.00 x 3.00 = 6.00
28.50 x 6.00 = 171.00
22.00 x 18.00 = 396.00
6.00 x 6.50 = 39.00
6.00 x 30.50 = 183.00

2 Pek. Pas. Lantai Keramik Tangga Panjang x Lebar 110.15 m2


= 6.00 5.50 = 33.00
= 32.30 1.65 = 53.30
= 15.90 1.50 = 23.85
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
3 Pek. Pas. Plint Keramik 15x60cm Panjang 630.15 630.15 m'

4 Pek. Pas. Lantai Keramik 30x30cm Panjang x Lebar 38.63 m2


3.50 x 3.00 = 10.50
3.00 x 3.50 = 10.50
3.65 x 1.50 = 5.48
3.55 x 3.00 = 10.65
1.00 x 1.50 = 1.50

5 Pek. Pas. Lantai Keramik KM/WC 20x20cm Panjang x Lebar x Jumlah 16.88 m2
= 1.50 x 1.50 x 5.00 = 11.25
= 1.50 x 1.60 x 1.00 = 2.40
= 1.50 x 2.15 x 1.00 = 3.23

6 Pek. Pas. Keramik Dinding KM/WC 20x40cm Panjang x Lebar x Jumlah 128.29 m2
= 5.20 x 1.80 x 3.00 = 28.08
= 5.70 x 1.80 x 1.00 = 10.26
= 6.15 x 1.80 x 2.00 = 22.14
= 12.05 x 1.80 x 1.00 = 21.69
= 17.45 x 1.80 x 1.00 = 31.41
Tmpt. Wudu' = 8.17 x 1.80 x 1.00 = 14.71

7 Pek. Rangka Plafond Besi Hollow Luas x Jumlah 1,310.76 m2


= 39.75 x 1.00 = 39.75
= 10.62 x 1.00 = 10.62
= 81.20 x 1.00 = 81.20
= 39.75 x 1.00 = 39.75

= 18.02 x 1.00 = 18.02


= 3.24 x 2.00 = 6.48
= 9.52 x 1.00 = 9.52
= 1.61 x 1.00 = 1.61
= 1.32 x 1.00 = 1.32
= 1.27 x 1.00 = 1.27
= 12.67 x 1.00 = 12.67
= 31.56 x 1.00 = 31.56
= 48.41 x 1.00 = 48.41
= 3.16 x 2.00 = 6.32
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
= 3.24 x 5.00 = 16.20
= 27.98 x 1.00 = 27.98
= 29.30 x 1.00 = 29.30
= 26.47 x 1.00 = 26.47
= 107.28 x 1.00 = 107.28
= 2.84 x 1.00 = 2.84
= 3.64 x 3.00 = 10.92
= 15.96 x 1.00 = 15.96
= 8.84 x 1.00 = 8.84
= 13.36 x 1.00 = 13.36
= 15.29 x 1.00 = 15.29
= 46.40 x 1.00 = 46.40
= 9.52 x 2.00 = 19.04
= 624.93 x 1.00 = 624.93
= 18.72 x 2.00 = 37.44

8 Pek. Plafond Gypsumboard t=9mm = 1,310.76 1,310.76 m2

9 Pek. List Plafond Gypsum 10cm Panjang = 821.25 821.25 m'

III PEKERJAAN BETON


1 Pek. Kolom Beton K.6 = 40x40cm, K.250 Panjang x Lebar x Tinggi x Jumlah 35.50 m3
= 0.40 0.40 4.35 51.00 = 35.50

2 Pek. Kolom Beton K.9 = 25x25cm, K.250 Panjang x Lebar x Tinggi x Jumlah 3.01 m3
= 0.25 0.25 4.35 6.00 = 1.63
= 0.25 0.25 2.00 2.00 = 0.25
= 0.25 0.25 3.00 6.00 = 1.13

3 Pek. Kolom Beton K.10 = 15x45cm, K.250 Panjang x Lebar x Tinggi x Jumlah 1.71 m3
= 0.15 0.45 4.35 4.00 = 1.17

= 0.15 0.45 2.00 4.00 0.54

4 Pek. Kolom Beton Praktis KP.1 =13x13cm, K.250 Panjang x Lebar x Tinggi x Jumlah 13.82 m3
= 0.13 0.13 4.35 188.00 = 13.82

5 Pek. Kolom Beton Praktis KP.2 = 15x30cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.57 m3
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
= 0.15 0.30 4.35 2.00 0.39
= 0.15 0.30 2.00 2.00 = 0.18

5 Pek. Kolom Beton K.8 = 30x30cm, K.250 Panjang x Lebar x Tinggi x Jumlah 1.57 m3
= 0.30 x 0.30 x 4.35 x 4.00 = 1.57

6 Pek. Balok Beton B.4 = 25x60cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.92 m3
= 6.10 0.25 0.60 1.00 = 0.92

7 Pek. Balok Beton B.5 = 25x60cm, K.250 Panjang x Lebar x Tinggi x Jumlah 4.58 m3
= 30.50 0.25 0.60 1.00 = 4.58

8 Pek. Balok Beton B.7 = 25x50cm, K.250 Panjang x Lebar x Tinggi x Jumlah 1.23 m3
= 9.80 0.25 0.50 1.00 = 1.23

9 Pek. Balok Beton B.10 = 25x60cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.84 m3
= 5.60 0.25 0.60 1.00 = 0.84

10 Pek. Balok Beton B.11 = 25x60cm, K.250 Panjang x Lebar x Tinggi x Jumlah 7.56 m3
= 50.40 0.25 0.60 1.00 = 7.56

11 Pek. Balok Beton B.12 = 25x50cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.76 m3
= 6.10 0.25 0.50 1.00 = 0.76

12 Pek. Balok Beton B.13 = 25x50cm, K.250 Panjang x Lebar x Tinggi x Jumlah 15.13 m3
= 121.00 0.25 0.50 1.00 = 15.13

13 Pek. Balok Beton B.14 = 25x50cm, K.250 Panjang x Lebar x Tinggi x Jumlah 11.10 m3
= 88.80 0.25 0.50 1.00 = 11.10

14 Pek. Balok Beton B.16 = 20x45cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.55 m3
= 6.10 0.20 0.45 1.00 = 0.55

15 Pek. Balok Beton B.17 = 20x45cm, K.250 Panjang x Lebar x Tinggi x Jumlah 2.21 m3
= 24.58 0.20 0.45 1.00 = 2.21

16 Pek. Balok Beton B.18 = 20x45cm, K.250 Panjang x Lebar x Tinggi x Jumlah 2.03 m3
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
= 22.50 0.20 0.45 1.00 = 2.03

17 Pek. Balok Beton B.20 = 20x40cm, K.250 Panjang x Lebar x Tinggi x Jumlah 13.60 m3
= 170.01 0.20 0.40 1.00 = 13.60

18 Pek. Balok Beton B.21 = 20x35cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.80 m3
= 11.40 0.20 0.35 1.00 = 0.80

19 Pek. Balok Beton B.22 = 15x30cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.98 m3
= 21.77 0.15 0.30 1.00 = 0.98

20 Pek. Balok Bordes Tangga = 15x25cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.74 m3
= 19.85 0.15 0.25 1.00 = 0.74

21 Pek. Plat Lantai Beton t=12cm, K.250 Luas x Tebal x Jumlah 20.75 m3
elevasi 12,25 = 172.95 x 0.12 x 1.00 = 20.75

22 Pek. Plat Atap Beton t=12cm, K.250 Luas x Tebal x Jumlah 73.05 m3
= 14.48 x 0.12 x 22.00 = 38.23
= 17.24 x 0.12 x 10.00 = 20.69
= 12.86 x 0.12 x 1.00 = 1.54
= 8.40 x 0.12 x 2.00 = 2.02
= 88.15 x 0.12 x 1.00 = 10.58

23 Pek. Plat Tangga Beton t=15cm, K.250 Panjang x Lebar x Tinggi x Jumlah 2.23 m3
= 9.90 1.50 0.15 1.00 = 2.23

24 Pek. Listplank Beton t=7cm, K.250 Panjang x Lebar x Tinggi x Jumlah 7.31 m3
= 174.00 0.60 0.07 1.00 = 7.31

IV PEKERJAAN KAYU
1 Pek. Kusen Kayu, Klas I Luas x Lebar x Jumlah 4.90 m3
P1 = 0.492 0.13 19.00 = 1.22
P2 = 0.385 0.13 4.00 = 0.20
P5 = 0.240 0.13 8.00 = 0.25
J2 = 0.548 0.13 18.00 = 1.28
J3 = 0.403 0.13 2.00 = 0.10
J4 = 0.675 0.13 4.00 = 0.35
J5 = 0.290 0.13 24.00 = 0.90
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5

J6 = 4.140 0.13 1.00 = 0.54


V1 = 0.136 0.13 3.00 = 0.05

2 Pek. Daun Pintu Panil + Kaca 5mm, Klas II Luas x Jumlah


P.1 = 3.84 x 19.00 = 72.96 72.96 m2

3 Pek. Daun Pintu Panil, Klas II Luas x Jumlah


P.2 = 1.91 x 4.00 = 7.65 7.65 m2

4 Pek. Daun Pintu Tripleks Lapis Alluminium Luas x Jumlah


P5 = 1.40 x 8.00 = 11.20 11.20 m2

5 Pek. Daun Jendela Kaca 5mm + Ventilasi, Klas II Luas x Jumlah 70.88 m2
P1 = 0.853 x 19.00 = 16.20
P2 = 0.440 x 4.00 = 1.76
J2 = 2.940 x 18.00 = 52.92

6 Pek. Kaca Mati 5mm Luas x Jumlah 80.19 m2


J3 = 2.328 x 2.00 = 4.66
J4 = 4.655 x 4.00 = 18.62
J5 = 1.600 x 24.00 = 38.40
J6 = 17.360 x 1.00 = 17.36
V1 = 0.384 x 3.00 = 1.15

7 Pek. List GRC Kusen Pintu Dan Jendela Panjang x Jumlah


J2 = 8.40 x 18.00 = 151.20 151.20 m'

V PEKERJAAN PENGUNCI DAN PENGGANTUNG


1 Pek. Handle Pintu Double Jumlah 38.00 bh
P.1 = 38.00 = 38.00

2 Pek. Kunci Pintu Mutu Tinggi Jumlah 31.00 bh


P.1 = 19.00 = 19.00
P.2 = 4.00 = 4.00
P5 = 8.00 = 8.00
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
3 Pek. Engsel Pintu Jumlah 150.00 bh
P.1 = 114.00 = 114.00
P.2 = 12.00 = 12.00
P5 = 24.00 = 24.00

4 Pek. Engsel Jendela Dan Ventilasi Jumlah 228.00 bh


P.1 = 76.00 = 76.00
P.2 = 8.00 = 8.00
J.2 = 144.00 = 144.00

5 Pek. Grendel Pintu Jumlah 50.00 bh


P.1 = 38.00 = 38.00
P.2 = 4.00 = 4.00
P5 = 8.00 = 8.00

6 Pek. Grendel Jendela Dan Ventilasi Jumlah 118.00 bh


P1 = 38.00 = 38.00
P2 = 8.00 = 8.00
J2 = 72.00 = 72.00

7 Pek. Expagolet Jumlah 38.00 bh


P1 = 38.00 = 38.00

8 Pek. Hak Angin Jendela Dan Ventilasi Jumlah 228.00 bh


P1 = 76.00 = 76.00
P2 = 8.00 = 8.00
J2 = 144.00 = 144.00

9 Pek. Angker Kusen Jumlah 526.00 bh


P1 = 152.00 = 152.00
P2 = 32.00 = 32.00
P5 = 48.00 = 48.00
J2 = 108.00 = 108.00
J3 = 12.00 = 12.00
J4 = 24.00 = 24.00
J5 = 144.00 = 144.00
V1 = 6.00 = 6.00
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
10 Pek. Relling Stainlessteel Panjang x Lebar x Jumlah
R1 = 5.50 0.90 8.00 = 39.60 39.60 m2 39.6

=
VI PEKERJAAN PENGECATAN
1 Pek. Cat Kayu Panjang x Tinggi x Jumlah 336.89 m2
P.1 = 10.15 x 0.36 x 19.00 = 69.43
P.2 = 7.90 x 0.36 x 4.00 = 11.38

P5 = 4.90 x 0.36 x 8.00 = 14.11


J.2 = 11.25 x 0.36 x 18.00 = 72.90
J.3 = 8.35 x 0.36 x 2.00 = 6.01
J.4 = 13.95 x 0.36 x 4.00 = 20.09
J.5 = 6.00 x 0.36 x 24.00 = 51.84
V.1 = 2.90 x 0.36 x 3.00 = 3.13
P.1 = 1.60 x 2.40 x 19.00 = 72.96
P.2 = 0.80 x 2.40 x 2.00 = 3.84
P5 = 0.70 x 2.00 x 8.00 = 11.20

2 Pek. Cat Dinding Tembok Volume Pek. Acian = 4,143.84 4,143.84 m2

3 Pek. Cat Plafond Volume Pek. Plafond = 1,310.76 1,310.76 m2

PEKERJAAN LANTAI 4 (EMPAT)


I PEKERJAAN PASANGAN DAN PLESTERAN
1 Pek. Pas. Dinding Bata 1/2Bt. Camp.1PC:5PS Panjang x Tinggi 529.34 m2
= 56.50 x 3.75 = 211.88
= 182.00 x 1.50 = 273.00
= 18.00 x 3.00 = 54.00
= 538.88
PENGURANGAN Panjang x Tinggi x Jumlah
P.2 = 0.90 x 3.05 x 3.00 = 8.24
P.6 = 1.00 x 1.30 x 1.00 = 1.30
9.54

2 Pek. Plesteran Dinding Bata, Camp.1PC:5PS Volume Pas. Dinding x 2.00 = 1,058.68 1,058.68 m2

3 Pek. Plesteran Kolom Beton, Camp.1PC:5PS Panjang x Tinggi x Jumlah 116.00 m2


NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
K7 = 1.60 x 2.00 x 32.00 = 102.40
K9 = 1.00 x 2.00 x 2.00 = 4.00
K10 = 1.20 x 2.00 x 4.00 = 9.60

3a Pek. Plesteran Balok Beton, Camp.1PC:5PS Panjang x Tinggi x Jumlah 296.96 m2


B5 = 5.90 x 0.60 x 16.00 = 56.64
B13 = 5.40 x 0.50 x 18.00 = 48.60
B13 = 5.90 x 0.50 x 3.00 = 8.85
B11 = 5.40 x 0.60 x 3.00 = 9.72
B14 = 4.90 x 0.50 x 1.00 = 2.45
B20 = 5.40 x 0.40 x 10.00 = 21.60
B20 = 5.90 x 0.40 x 4.00 = 9.44

B20 = 15.40 x 0.40 x 1.00 = 6.16


R1 = 175.00 x 0.40 x 1.00 = 70.00
Plat tangga = 5.63 x 1.50 x 3.00 = 25.34
Plat tangga = 1.50 x 2.85 x 3.00 = 12.83
Plat tangga = 5.63 x 1.50 x 3.00 = 25.34

4 Pek. Acian Volume Plesteran = 1,471.64 1,471.64 m2

II PEKERJAAN LANTAI
1 Pek. Pas. Lantai Keramik 60x60cm Panjang x Lebar x Jumlah 207.08 m2
= 6.00 x 6.35 x 2.00 = 76.20
= 6.00 x 6.35 x 3.00 = 114.30
= 6.50 x 2.55 x 2.00 x 0.50 = 16.58

2 Pek. Pas. Lantai Keramik Tangga Panjang x Lebar 26.65 m2


= 16.15 1.65 = 26.65

3 Pek. Pas. Plint Keramik 15x60cm Panjang = 108.96 108.96 m'

4 Pek. Rangka Plafond Besi Hollow = Volume Pek. Plafond = 932.31 932.31 m2

5 Pek. Plafond Gypsumboard t=9mm Luas x Jumlah 932.31 m2


= 16.58 x 1.00 = 16.58
= 59.19 x 1.00 = 59.19
= 17.94 x 1.00 = 17.94
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
= 36.65 x 1.00 = 36.65
= 38.87 x 1.00 = 38.87
= 38.66 x 1.00 = 38.66
= 38.25 x 1.00 = 38.25
= 38.38 x 1.00 = 38.38
= 51.95 x 1.00 = 51.95
= 46.01 x 2.00 = 92.03
= 13.40 x 2.00 = 26.80
= 3.18 x 2.00 = 6.35
= 3.16 x 2.00 = 6.32
= 55.38 x 1.00 = 55.38
= 35.80 x 1.00 = 35.80
= 17.09 x 1.00 = 17.09
= 17.17 x 1.00 = 17.17
= 338.90 x 1.00 = 338.90

6 Pek. List Plafond Gypsum 10cm Panjang = 826.12 826.12 m'

III PEKERJAAN BETON


1 Pek. Kolom Beton K.7 = 40x40cm, K.250 Panjang x Lebar x Tinggi x Jumlah 10.24 m3
= 0.40 0.40 2.00 32.00 = 10.24

2 Pek. Kolom Beton K.9 = 25x25cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.50 m3
= 0.25 0.25 2.00 4.00 = 0.50

3 Pek. Kolom Beton K.10 = 15x45cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.54 m3
= 0.15 0.45 2.00 4.00 = 0.54

4 Pek. Kolom Beton Praktis KP.2 = 15x30cm, K.250 Panjang x Lebar x Tinggi x Jumlah - m3
= 0.15 0.30 2.00 - = -

4 Pek. Kolom Beton Praktis KP.1 =13x13cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.51 m3
= 0.13 0.13 2.00 15.00 = 0.51

4 Pek. Kolom Beton K.8 = 30x30cm, K.250 Panjang x Lebar x Tinggi x Jumlah 1.08 m3
= 0.30 x 0.30 x 2.00 x 6.00 = 1.08
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
5 Pek. Ring Balok Beton R.1 = 35x50cm, K.250 Panjang x Lebar x Tinggi x Jumlah 35.89 m3
= 205.10 0.35 0.50 1.00 = 35.89

6 Pek. Balok Beton B.21 = 20x35cm, K.250 Panjang x Lebar x Tinggi x Jumlah 2.06 m3
= 29.40 0.20 0.35 1.00 = 2.06

7 Pek. Balok latei = 13x15 cm el. + 12.05 Panjang x Lebar x Tinggi x Jumlah 1.10 m3
= 3.95 0.13 0.15 9.00 = 0.69
= 3.55 0.13 0.15 2.00 = 0.14
= 4.55 0.13 0.15 3.00 = 0.27

IV PEKERJAAN KAYU
1 Pek. Kusen Kayu, Klas I Luas x Lebar x Jumlah 0.21 m3
P1 = 0.492 0.13 1.00 = 0.06
P2 = 0.385 0.13 3.00 = 0.15

2 Pek. Daun Pintu Panil + Kaca 5mm, Klas II Luas x Jumlah


P1 = 3.84 1.00 = 3.84 3.84 m2

3 Pek. Daun Pintu Panil, Klas II Luas x Jumlah

P2 = 1.40 3.00 = 4.20 4.20 m2

4 Pek. Daun Ventilasi, Klas II Luas x Jumlah 2.17 m2


P1 = 0.85 1.00 = 0.85
P2 = 0.44 3.00 = 1.32

V PEKERJAAN PENGUNCI DAN PENGGANTUNG


1 Pek. Kunci Pintu Mutu Tinggi Jumlah 4.00 bh
P1 = 1.00 = 1.00
P2 = 3.00 = 3.00

2 Pek. Engsel Pintu 15.00 bh


P1 = 6.00 = 6.00
P2 = 9.00 = 9.00

3 Pek. Engsel Ventilasi 10.00 bh


P1 = 4.00 = 4.00
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
P2 = 6.00 = 6.00

4 Pek. Grendel Pintu 4.00 bh


P1 = 1.00 = 1.00
P2 = 3.00 = 3.00

5 Pek. Grendel Jendela Dan Ventilasi 5.00 bh


P1 = 2.00 = 2.00
P2 = 3.00 = 3.00

6 Pek. Hak Angin Ventilasi 10.00 bh


P1 = 4.00 = 4.00
P2 = 6.00 = 6.00

7 Pek. Angker Kusen 32.00 bh


P1 = 8.00 = 8.00
P2 = 24.00 = 24.00

8 Pek. Relling Stainlessteel Panjang x Lebar x Jumlah 38.13 m2


Void = 6.62 x 0.90 x 2.00 = 11.92
Void = 7.13 x 0.90 x 1.00 = 6.42
Tangga 5.50 0.90 4.00 19.80

VI PEKERJAAN KONSTRUKSI ATAP


1 Pek. Kolom Baja = 36.70 kg/m' 2,157.96 kg 2476.8
Profil WF 300x150x6.5x9mm = P x T x N =
- KUDA-KUDA TYPE - A. (2 BUAH) = 1.40 x 2.00 x 2.00 = 205.52
- KUDA-KUDA TYPE - B. (5 BUAH) = 1.40 x 2.00 x 5.00 = 513.80
- 1/2 KUDA-KUDA TYPE - D. (2 BUAH) = 1.40 x 1.00 x 2.00 = 102.76
- KUDA-KUDA TRAPESIUM TYPE - C. (2 BUAH) = 1.40 x 2.00 x 2.00 = 205.52
- 1/4 KUDA-KUDA TYPE - E. (3 BUAH) = 1.40 x 1.00 x 3.00 = 154.14
- JURAI TYPE - F. (3 BUAH) = 1.40 x 1.00 x 3.00 = 154.14
- KUDA-KUDA TYPE - G. (1 BUAH) = 1.40 x 2.00 x 1.00 = 102.76
- KUDA-KUDA TIPE -H (3 BUAH) = 1.40 x 2.00 x 3.00 = 308.28
- KUDA-KUDA TIPE -H' (1 BUAH) = 1.40 x 1.00 x 1.00 = 51.38
- 1/2 KUDA-KUDA TYPE - J. (1 BUAH) = 1.40 x 1.00 x 1.00 = 51.38
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
- KUDA-KUDA TRAPESIUM TYPE - I. (1 BUAH) = 1.40 x 2.00 x 1.00 = 102.76
- 1/4 KUDA-KUDA TYPE - K. (2 BUAH) = 1.40 x 1.00 x 2.00 = 102.76
- JURAI TYPE - L. (2 BUAH) = 1.40 x 1.00 x 2.00 = 102.76

2 Pek. Rangka Kap Baja = 36.70 20,749.45 kg


Profil WF 300x150x6.5x 9 mm = P x L x T x N
- KUDA-KUDA TYPE - A. (2 BUAH) = 14.30 x x 2.00 2.00 = 2,099.24
- KUDA-KUDA TYPE - B. (5 BUAH) = 14.30 x x 2.00 5.00 = 5,248.10
- 1/2 KUDA-KUDA TYPE - D. (2 BUAH) = 14.30 x x 1.00 2.00 = 1,049.62
- KUDA-KUDA TRAPESIUM TYPE - C. (2 BUAH) = 26.53 x x 1.00 2.00 = 1,947.30
- 1/4 KUDA-KUDA TYPE - E. (3 BUAH) = 8.30 x x 1.00 3.00 = 913.83
- JURAI TYPE - F. (3 BUAH) = 18.50 x x 1.00 3.00 = 2,036.85
- KUDA-KUDA TYPE - G. (1 BUAH) = 13.40 x x 2.00 1.00 = 983.56
- KUDA-KUDA TIPE -H (3 BUAH) = 13.40 x 2.00 x 3.00 = 2,950.68
- KUDA-KUDA TIPE -H '(1 BUAH) = 7.32 x 1.00 x 1.00 = 268.64
- 1/2 KUDA-KUDA TYPE - J. (1 BUAH) = 13.40 x x 1.00 1.00 = 491.78
- KUDA-KUDA TRAPESIUM TYPE - I. (1 BUAH) = 24.80 x x 1.00 1.00 = 910.16
- 1/4 KUDA-KUDA TYPE - K. (2 BUAH) = 7.90 x x 1.00 2.00 = 579.86
- JURAI TYPE - L. (2 BUAH) = 17.30 x x 1.00 2.00 = 1,269.82

3 Pek. Rangka Baja Pengaku = 36.70 1,999.78 kg


Profil WF 300x150x6.5x9mm = P x L x T x N
= 54.49 1.00 = 1,999.78

4 Pek. Voute Baja Belah = 36.70 1,550.58 kg


Profil WF 300x150x6.5x9mm = P x L x T x N
- KUDA-KUDA TYPE - A. (2 BUAH) = 2.00 x 2.00 = 146.80

- KUDA-KUDA TYPE - B. (5 BUAH) = 2.00 x 5.00 = 367.00


- 1/2 KUDA-KUDA TYPE - D. (2 BUAH) = 1.00 x 2.00 = 73.40
- KUDA-KUDA TRAPESIUM TYPE - C. (2 BUAH) = 2.00 x 2.00 = 146.80
- 1/4 KUDA-KUDA TYPE - E. (3 BUAH) = 0.75 x 3.00 = 82.58
- JURAI TYPE - F. (3 BUAH) = 1.00 x 3.00 = 110.10
- KUDA-KUDA TYPE - G. (1 BUAH) = 2.00 x 1.00 = 73.40
- KUDA-KUDA TIPE -H (3 BUAH) = 2.00 x 3.00 = 220.20
- KUDA-KUDA TIPE -H '(1 BUAH) = 2.00 x 1.00 = 73.40
- 1/2 KUDA-KUDA TYPE - J. (1 BUAH) = 1.00 x 1.00 = 36.70
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
- KUDA-KUDA TRAPESIUM TYPE - I. (1 BUAH) = 2.00 x 1.00 = 73.40
- 1/4 KUDA-KUDA TYPE - K. (2 BUAH) = 1.00 x 2.00 = 73.40
- JURAI TYPE - L. (2 BUAH) = 1.00 x 2.00 = 73.40

5 Pek. Gording Baja C 150.65.20.3,2mm = 7.52 17,870.92 kg


= P x L x T x N
= 199.10 = 1,496.63
= 192.70 = 1,448.53
= 186.30 = 1,400.42
= 179.90 = 1,352.31
= 173.50 = 1,304.20
= 167.10 = 1,256.09
= 160.70 = 1,207.98
= 154.30 = 1,159.87
= 147.90 = 1,111.76
= 141.50 = 1,063.66
= 135.10 = 1,015.55
= 128.70 = 967.44
= 122.30 = 919.33
= 68.30 = 513.41
= 61.00 = 458.54
= 47.00 = 353.30
= 112.00 = 841.90

6 Pek. Dudukan Gording Baja Siku 50.65.5mm = 4.60 767.83 kg


= P x L x T x N
- KUDA-KUDA TYPE - A. (2 BUAH) = 15.00 0.32 2.00 2.00 = 88.26
- KUDA-KUDA TYPE - B. (5 BUAH) = 15.00 0.32 2.00 5.00 = 220.64
- 1/2 KUDA-KUDA TYPE - D. (2 BUAH) = 15.00 0.32 1.00 2.00 = 44.13
- KUDA-KUDA TRAPESIUM TYPE - C. (2 BUAH) = 9.00 0.32 1.00 2.00 = 26.48
- 1/4 KUDA-KUDA TYPE - E. (3 BUAH) = 9.00 0.32 1.00 3.00 = 39.72
- JURAI TYPE - F. (3 BUAH) = 15.00 0.32 1.00 3.00 = 66.19

- KUDA-KUDA TYPE - G. (1 BUAH) = 14.00 0.32 2.00 1.00 = 41.19


- KUDA-KUDA TIPE -H (3 BUAH) = 14.00 0.32 2.00 x 3.00 = 123.56
- KUDA-KUDA TIPE -H '(1 BUAH) = 14.00 0.32 1.00 x 1.00 = 20.59
- 1/2 KUDA-KUDA TYPE - J. (1 BUAH) = 14.00 0.32 1.00 1.00 = 20.59
- KUDA-KUDA TRAPESIUM TYPE - I. (1 BUAH) = 8.00 0.32 1.00 1.00 = 11.77
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
- 1/4 KUDA-KUDA TYPE - K. (2 BUAH) = 8.00 0.32 1.00 2.00 = 23.53
- JURAI TYPE - L. (2 BUAH) = 14.00 0.32 1.00 2.00 = 41.19

7 Pek. Plat Dudukan/Landasan t = 16mm = 125.76 475.37 kg


= P x L x T x N
- KUDA-KUDA TYPE - A. (2 BUAH) = 0.30 0.30 2.00 2.00 = 45.27
- KUDA-KUDA TYPE - B. (5 BUAH) = 0.30 0.30 2.00 5.00 = 113.18
- 1/2 KUDA-KUDA TYPE - D. (2 BUAH) = 0.30 0.30 1.00 2.00 = 22.64
- KUDA-KUDA TRAPESIUM TYPE - C. (2 BUAH) = 0.30 0.30 2.00 2.00 = 45.27
- 1/4 KUDA-KUDA TYPE - E. (3 BUAH) = 0.30 0.30 1.00 3.00 = 33.96
- JURAI TYPE - F. (3 BUAH) = 0.30 0.30 1.00 3.00 = 33.96
- KUDA-KUDA TYPE - G. (1 BUAH) = 0.30 0.30 2.00 1.00 = 22.64
- KUDA-KUDA TIPE -H (3 BUAH) = 0.30 0.30 2.00 3.00 = 67.91
- KUDA-KUDA TIPE -H '(1 BUAH) = 0.30 0.30 1.00 1.00 = 11.32
- 1/2 KUDA-KUDA TYPE - J. (1 BUAH) = 0.30 0.30 1.00 1.00 = 11.32
- KUDA-KUDA TRAPESIUM TYPE - I. (1 BUAH) = 0.30 0.30 2.00 1.00 = 22.64
- 1/4 KUDA-KUDA TYPE - K. (2 BUAH) = 0.30 0.30 1.00 2.00 = 22.64
- JURAI TYPE - L. (2 BUAH) = 0.30 0.30 1.00 2.00 = 22.64

8 Pek. Plat Pengaku = 62.88 1,321.18 kg


Kuda- Kuda/Plat Stifner t = 8mm = P x L x T x N
- KUDA-KUDA TYPE - A. (2 BUAH) = 30.00 0.14 0.28 2.00 = 147.89
- KUDA-KUDA TYPE - B. (5 BUAH) = 30.00 0.14 0.28 5.00 = 369.73
- 1/2 KUDA-KUDA TYPE - D. (2 BUAH) = 15.00 0.14 0.28 2.00 = 73.95
- KUDA-KUDA TRAPESIUM TYPE - C. (2 BUAH) = 9.00 0.14 0.28 2.00 = 44.37
- 1/4 KUDA-KUDA TYPE - E. (3 BUAH) = 9.00 0.14 0.28 3.00 = 66.55
- JURAI TYPE - F. (3 BUAH) = 15.00 0.14 0.28 3.00 = 110.92
- KUDA-KUDA TYPE - G. (1 BUAH) = 28.00 0.14 0.28 1.00 = 69.02
- KUDA-KUDA TIPE -H (3 BUAH) = 28.00 0.14 0.28 3.00 = 207.05
- KUDA-KUDA TIPE -H '(1 BUAH) = 28.00 0.14 0.28 1.00 = 69.02
- 1/2 KUDA-KUDA TYPE - J. (1 BUAH) = 14.00 0.14 0.28 1.00 = 34.51
- KUDA-KUDA TRAPESIUM TYPE - I. (1 BUAH) = 8.00 0.14 0.28 1.00 = 19.72
- 1/4 KUDA-KUDA TYPE - K. (2 BUAH) = 8.00 0.14 0.28 2.00 = 39.44
- JURAI TYPE - L. (2 BUAH) = 14.00 0.14 0.28 2.00 = 69.02

9 Pek. Plat Simpul t = 12mm = 94.32 56.78 kg


NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
= P x L x T x N
- KUDA-KUDA TYPE - A. (2 BUAH) = 2.00 0.14 0.10 2.00 = 5.28
- KUDA-KUDA TYPE - B. (5 BUAH) = 2.00 0.14 0.10 5.00 = 13.20
- 1/2 KUDA-KUDA TYPE - D. (2 BUAH) = 1.00 0.14 0.10 2.00 = 2.64
- KUDA-KUDA TRAPESIUM TYPE - C. (2 BUAH) = 2.00 0.14 0.10 2.00 = 5.28
- 1/4 KUDA-KUDA TYPE - E. (3 BUAH) = 1.00 0.14 0.10 3.00 = 3.96
- JURAI TYPE - F. (3 BUAH) = 1.00 0.14 0.10 3.00 = 3.96
- KUDA-KUDA TYPE - G. (1 BUAH) = 2.00 0.14 0.10 1.00 = 2.64
- KUDA-KUDA TIPE -H (3 BUAH) = 2.00 0.14 0.10 3.00 = 7.92
- KUDA-KUDA TIPE -H '(1 BUAH) = 2.00 0.14 0.10 1.00 = 2.64
- 1/2 KUDA-KUDA TYPE - J. (1 BUAH) = 1.00 0.14 0.10 1.00 = 1.32
- KUDA-KUDA TRAPESIUM TYPE - I. (1 BUAH) = 2.00 0.14 0.10 1.00 = 2.64
- 1/4 KUDA-KUDA TYPE - K. (2 BUAH) = 1.00 0.14 0.10 2.00 = 2.64
- JURAI TYPE - L. (2 BUAH) = 1.00 0.14 0.10 2.00 = 2.64

10 Pek. Besi Treckstang 16mm = 903.36 M


= P x L x T x N
- KUDA-KUDA TYPE - A. (2 BUAH) = 21.40 2.00 = 42.80
- KUDA-KUDA TYPE - B. (5 BUAH) = 21.40 5.00 = 107.00
- KUDA-KUDA TRAPESIUM TYPE - C. (2 BUAH) = 21.40 2.00 = 42.80
- KUDA-KUDA TYPE - G. (1 BUAH) = 20.40 1.00 = 20.40
- KUDA-KUDA TIPE -H (3 BUAH) = 20.40 3.00 = 61.20
- KUDA-KUDA TIPE -H '(1 BUAH)
- KUDA-KUDA TRAPESIUM TYPE - I. (1 BUAH) = 20.40 1.00 = 20.40
= 13.28 22.00 = 292.16
= 7.50 6.00 = 45.00
= 12.18 20.00 = 243.60
= 7.00 4.00 = 28.00

11 Pek. Besi Pengikat Gording/Sagrod 10mm = 542.00 kg


= P x L x T x N
= 14.00 22.00 = 308.00
= 13.00 18.00 = 234.00

12 Bout Angkur 22mm (p = 550 mm) = P x L x T x N 252.00 bh


- KUDA-KUDA TYPE - A. (2 BUAH) = 6.00 2.00 2.00 = 24.00
- KUDA-KUDA TYPE - B. (5 BUAH) = 6.00 2.00 5.00 = 60.00
- 1/2 KUDA-KUDA TYPE - D. (2 BUAH) = 6.00 1.00 2.00 = 12.00
- KUDA-KUDA TRAPESIUM TYPE - C. (2 BUAH) = 6.00 2.00 2.00 = 24.00
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
- 1/4 KUDA-KUDA TYPE - E. (3 BUAH) = 6.00 1.00 3.00 = 18.00

- JURAI TYPE - F. (3 BUAH) = 6.00 1.00 3.00 = 18.00


- KUDA-KUDA TYPE - G. (1 BUAH) = 6.00 2.00 1.00 = 12.00
- KUDA-KUDA TIPE -H (3 BUAH) = 6.00 2.00 3.00 = 36.00
- KUDA-KUDA TIPE -H '(1 BUAH) = 6.00 1.00 1.00 = 6.00
- 1/2 KUDA-KUDA TYPE - J. (1 BUAH) = 6.00 1.00 1.00 = 6.00
- KUDA-KUDA TRAPESIUM TYPE - I. (1 BUAH) = 6.00 2.00 1.00 = 12.00
- 1/4 KUDA-KUDA TYPE - K. (2 BUAH) = 6.00 1.00 2.00 = 12.00
- JURAI TYPE - L. (2 BUAH) = 6.00 1.00 2.00 = 12.00

13 Bout Mur Kuda-kuda 16mm = P x L x T x N 1,788.00 bh


- KUDA-KUDA TYPE - A. (2 BUAH) = 46.00 2.00 2.00 = 184.00
- KUDA-KUDA TYPE - B. (5 BUAH) = 39.00 2.00 5.00 = 390.00
- 1/2 KUDA-KUDA TYPE - D. (2 BUAH) = 39.00 1.00 2.00 = 78.00
- KUDA-KUDA TRAPESIUM TYPE - C. (2 BUAH) = 44.00 2.00 2.00 = 176.00
- 1/4 KUDA-KUDA TYPE - E. (3 BUAH) = 39.00 1.00 3.00 = 117.00
- JURAI TYPE - F. (3 BUAH) = 39.00 1.00 3.00 = 117.00
- KUDA-KUDA TYPE - G. (1 BUAH) = 46.00 2.00 1.00 = 92.00
- KUDA-KUDA TIPE -H (3 BUAH) = 39.00 2.00 4.00 = 312.00
- KUDA-KUDA TIPE -H '(1 BUAH) = 39.00 1.00 1.00 = 39.00
- 1/2 KUDA-KUDA TYPE - J. (1 BUAH) = 39.00 1.00 1.00 = 39.00
- KUDA-KUDA TRAPESIUM TYPE - I. (1 BUAH) = 44.00 2.00 1.00 = 88.00
- 1/4 KUDA-KUDA TYPE - K. (2 BUAH) = 39.00 1.00 2.00 = 78.00
- JURAI TYPE - L. (2 BUAH) = 39.00 1.00 2.00 = 78.00

14 Pek. Pengelasan =
Plat Dudukan/Landasan t = 16mm = P x L x T x N 4,707.60 kg
- KUDA-KUDA TYPE - A. (2 BUAH) = 10.00 1.45 2.00 2.00 = 58.00
- KUDA-KUDA TYPE - B. (5 BUAH) = 10.00 1.45 2.00 5.00 = 145.00
- 1/2 KUDA-KUDA TYPE - D. (2 BUAH) = 10.00 1.45 1.00 2.00 = 29.00
- KUDA-KUDA TRAPESIUM TYPE - C. = 10.00 1.45 2.00 2.00 = 58.00
- 1/4 KUDA-KUDA TYPE - E. (3 BUAH) = 10.00 1.45 1.00 3.00 = 43.50
- JURAI TYPE - F. (3 BUAH) = 10.00 1.45 1.00 3.00 = 43.50
- KUDA-KUDA TYPE - G. (1 BUAH) = 10.00 1.45 2.00 1.00 = 29.00
- KUDA-KUDA TIPE -H (3 BUAH) = 10.00 1.45 2.00 3.00 = 87.00
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
- KUDA-KUDA TIPE -H '(1 BUAH) = 10.00 1.45 1.00 1.00 = 14.50
- 1/2 KUDA-KUDA TYPE - J. (1 BUAH) = 10.00 1.45 1.00 1.00 = 14.50
- KUDA-KUDA TRAPESIUM TYPE - I. = 10.00 1.45 2.00 1.00 = 29.00
- 1/4 KUDA-KUDA TYPE - K. (2 BUAH) = 10.00 1.45 1.00 2.00 = 29.00
- JURAI TYPE - L. (2 BUAH) = 10.00 1.45 1.00 2.00 = 29.00

Voute Baja Belah Profil WF 300x150x5.5x8mm


- KUDA-KUDA TYPE - A. (2 BUAH) = 10.00 5.50 2.00 2.00 = 220.00
- KUDA-KUDA TYPE - B. (5 BUAH) = 10.00 5.50 2.00 5.00 = 550.00
- 1/2 KUDA-KUDA TYPE - D. (2 BUAH) = 10.00 5.50 1.00 2.00 = 110.00
- KUDA-KUDA TRAPESIUM TYPE - C. = 10.00 5.50 2.00 2.00 = 220.00
- 1/4 KUDA-KUDA TYPE - E. (3 BUAH) = 10.00 5.50 1.00 3.00 = 165.00
- JURAI TYPE - F. (3 BUAH) = 10.00 5.50 1.00 3.00 = 165.00
- KUDA-KUDA TYPE - G. (1 BUAH) = 10.00 5.50 2.00 1.00 = 110.00
- KUDA-KUDA TIPE -H (3 BUAH) = 10.00 5.50 2.00 3.00 = 330.00
- KUDA-KUDA TIPE -H '(1 BUAH) = 10.00 5.50 1.00 1.00 = 55.00
- 1/2 KUDA-KUDA TYPE - J. (1 BUAH) = 10.00 5.50 1.00 1.00 = 55.00
- KUDA-KUDA TRAPESIUM TYPE - I. = 10.00 5.50 2.00 1.00 = 110.00
- 1/4 KUDA-KUDA TYPE - K. (2 BUAH) = 10.00 5.50 1.00 2.00 = 110.00
- JURAI TYPE - L. (2 BUAH) = 10.00 5.50 1.00 2.00 = 110.00
Plat Pengaku Kuda- Kuda/Plat Stifner t = 8mm
- KUDA-KUDA TYPE - A. (2 BUAH) = 10.00 1.68 2.00 2.00 = 67.20
- KUDA-KUDA TYPE - B. (5 BUAH) = 10.00 1.68 2.00 5.00 = 168.00
- 1/2 KUDA-KUDA TYPE - D. (2 BUAH) = 10.00 1.68 1.00 2.00 = 33.60
- KUDA-KUDA TRAPESIUM TYPE - C. = 10.00 1.68 2.00 2.00 = 67.20
- 1/4 KUDA-KUDA TYPE - E. (3 BUAH) = 10.00 1.68 1.00 3.00 = 50.40
- JURAI TYPE - F. (3 BUAH) = 10.00 1.68 1.00 3.00 = 50.40
- KUDA-KUDA TYPE - G. (1 BUAH) = 10.00 1.68 2.00 1.00 = 33.60
- KUDA-KUDA TIPE -H (3 BUAH) = 10.00 1.68 2.00 3.00 = 100.80
- KUDA-KUDA TIPE -H '(1 BUAH) = 10.00 1.68 1.00 1.00 = 16.80
- 1/2 KUDA-KUDA TYPE - J. (1 BUAH) = 10.00 1.68 1.00 1.00 = 16.80
- KUDA-KUDA TRAPESIUM TYPE - I. = 10.00 1.68 2.00 1.00 = 33.60
- 1/4 KUDA-KUDA TYPE - K. (2 BUAH) = 10.00 1.68 1.00 2.00 = 33.60
- JURAI TYPE - L. (2 BUAH) = 10.00 1.68 1.00 2.00 = 33.60
Dudukan Gording Baja Siku 50.65.5mm
- KUDA-KUDA TYPE - A. (2 BUAH) = 10.00 0.30 15.00 2.00 = 90.00
- KUDA-KUDA TYPE - B. (5 BUAH) = 10.00 0.30 15.00 5.00 = 225.00
- 1/2 KUDA-KUDA TYPE - D. (2 BUAH) = 10.00 0.30 15.00 2.00 = 90.00
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
- KUDA-KUDA TRAPESIUM TYPE - C. = 10.00 0.30 9.00 2.00 = 54.00
- 1/4 KUDA-KUDA TYPE - E. (3 BUAH) = 10.00 0.30 9.00 3.00 = 81.00
- JURAI TYPE - F. (3 BUAH) = 10.00 0.30 15.00 3.00 = 135.00
- KUDA-KUDA TYPE - G. (1 BUAH) = 10.00 0.30 14.00 1.00 = 42.00
- KUDA-KUDA TYPE - H. (4 BUAH) = 10.00 0.30 14.00 4.00 = 168.00
- 1/2 KUDA-KUDA TYPE - J. (1 BUAH) = 10.00 0.30 14.00 1.00 = 42.00
- KUDA-KUDA TRAPESIUM TYPE - I. = 10.00 0.30 8.00 1.00 = 24.00
- 1/4 KUDA-KUDA TYPE - K. (2 BUAH) = 10.00 0.30 8.00 2.00 = 48.00
- JURAI TYPE - L. (2 BUAH) = 10.00 0.30 14.00 2.00 = 84.00

15 Pek. Erection/Penyetelan = 469.50 469.50 /100 kg

16 Pek. Rangka Usuk Reng Baja Ringan = 2,617.68 m2


= Luasan x L x T x N
= 2,617.68 = 2,617.68

17 Pek. Atap Genteng Keramik Kw.I = P x L x T = P 2,617.68 m2


1 = 23.50 x 16.60 x 0.50 = 195.05
2 = 64.74 x 16.60 x 0.50 = 537.34
3 = 83.99 x 16.60 x 0.50 = 697.12
4 = 22.00 x 15.55 x 0.50 = 171.05
5 = 45.50 x 15.55 x 0.50 = 353.76
6 = 71.25 x 15.55 x 0.50 = 553.97
area lumbung = 16.83 x 6.50 x = 109.39

18 Pek. Bubungan Genteng Keramik Kw.I = Panjang 153.50 m


= 153.50 = 153.50

19 Pek. Papan Calsiplank 2x2/30cm' = Panjang 202.25 m


= 202.25 = 202.25

VII PEKERJAAN PENGECATAN


1 Pek. Cat Kayu Luas x Jumlah 8.64 m2
P1 = 5.185 x 1.00 = 5.18
P2 = 1.151 x 3.00 = 3.45

2 Pek. Cat Dinding Tembok = Volume pek. Acian = 1,471.64 1,471.64 m2


NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
PEKERJAAN PLANK NAMA DAN GAPURA
I PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Pondasi Footplat Panjang x Lebar x Tinggi x Jumlah 12.80 m3
= 1.00 1.00 1.60 8.00 = 12.80

2 Pek. Galian Tanah Pondasi Batu Kali Panjang x Lebar x Tinggi x Jumlah 22.65 m3
1.35 0.70 0.80 6.00 = 4.54
2.10 0.70 0.80 4.00 = 4.70
15.40 0.70 0.80 1.00 = 8.62
8.55 0.70 0.80 1.00 = 4.79

3 Pek. Urugan Kembali = 35.45 m3

4 Pek. Urugan Pasir Bawah Pondasi Footplat Panjang x Lebar x Tinggi x Jumlah 0.80 m3
= 1.00 1.00 0.10 8.00 = 0.80

5 Pek. Urugan Pasir Bawah Pondasi Batu Kali Panjang x Lebar x Tinggi x Jumlah 2.83 m3
= 1.35 0.70 0.10 6.00 = 0.57
= 2.10 0.70 0.10 4.00 = 0.59
= 15.40 0.70 0.10 1.00 = 1.08
= 8.55 0.70 0.10 1.00 = 0.60
II PEKERJAAN PASANGAN DAN PLESTERAN
1 Pek. Batu Kosong Panjang x Lebar x Tinggi
= 40.45 x 0.70 x 0.20 = 5.66 5.66 m3

2 Pek. Pas. Pondasi Batu Kali, Camp.1PC:5PS Panjang x Lebar x Tinggi


= 40.45 x 0.40 x 0.55 = 8.90 8.90 m3

3 Pek. Pas. Dinding Bata 1/2Bt. Camp.1PC:5PS Panjang x Tinggi 95.83 m2


= 17.55 x 3.15 = 55.28
= 11.00 x 0.65 = 7.15
= 4.00 x 7.00 = 28.00
= 5.40 x 1.00 = 5.40

4 Pek. Plesteran Dinding Bata, Camp.1PC:5PS = Volume Pas. Dinding Bata x 2.00 = 191.67 191.67 m2

5 Pek. Plesteran Kolom Beton Dan Gapura, Camp.1PC:5PS Lebar x Tinggi x Jumlah 95.76 m2
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
1.20 2.70 4.00 = 12.96
0.50 2.70 8.00 = 10.80
1.50 12.00 4.00 = 72.00

6 Pek. Acian = Total Volume Plesteran = 287.43 287.43 m2

III PEKERJAAN BETON


1 Pek. Lantai Kerja t=10cm, K.100 Panjang x Lebar x Tinggi x Jumlah 0.80 m3
= 1.00 1.00 0.10 8.00 = 0.80

2 Pek. Pondasi Footplat =1,00x1,00m', K.250 Panjang x Lebar x Tinggi x Jumlah 3.20 m3
= 1.00 1.00 0.40 8.00 = 3.20

3 Pek. Sloof Beton =15x25cm, K.250 Panjang x Lebar x Tinggi x Jumlah 1.52 m3
= 40.45 0.15 0.25 1.00 = 1.52

4 Pek. Kolom Beton K.1 = 15x25cm', K.250 Panjang x Lebar x Tinggi x Jumlah Jumlah 1.43 m3
= 0.15 0.25 4.75 8.00 = 1.43

5 Pek. Kolom Beton K.2 = 20x40cm', K.250 Panjang x Lebar x Tinggi x Jumlah 0.91 m3
= 0.20 0.40 2.85 4.00 = 0.91

6 Pek. Kolom Beton K.3 = 15x25cm', K.250 Panjang x Lebar x Tinggi x Jumlah 0.74 m3
= 0.25 0.15 4.90 4.00 = 0.74

7 Pek. Kolom Beton KP = 13x13cm', K.250 Panjang x Lebar x Tinggi x Jumlah 0.38 m3
= 0.13 0.13 3.25 7.00 = 0.38

8 Pek. Kolom Beton KP.1 = 9x15cm', K.250 Panjang x Lebar x Tinggi x Jumlah 0.35 m3
= 0.09 0.15 3.25 8.00 = 0.35

9 Pek. Balok Beton = 15x25cm, K.250 Panjang x Lebar x Tinggi x Jumlah 1.52 m3
= 40.45 0.15 0.25 1.00 = 1.52

10 Pek. Plat Dak Gapura Luas x Lebar x Tinggi x Jumlah 4.83 m3


NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
Dan Plank Nama t=10cm, K.250 = 6.00 0.10 2.00 = 1.20
= 8.55 0.15 0.12 1.00 = 0.15
= 4.20 0.10 4.00 = 1.68
= 9.00 0.10 2.00 = 1.80

IV PEKERJAAN PLANK NAMA


1 Pek. Pas. Dinding Granite 60x60cm = 2.00 x 7.00 = 14.00 14.00 m2

2 Pek. Pas. Batu Tempel Palimanan = 11.50 x 0.35 = 4.03 4.03 m2

3 Pek. Logo Kab. Lombok Timur uk.55x70cm' (Acrylik) = 1.00 1.00 bh

4 Pek. Letter Set Stainlessteel uk.17cm' t=5cm'(Type Arial Bold) = 47.00 47.00 bh

5 Pek. Letter Set Stainlessteel uk.25cm' t=5cm'(Type Arial Bold) = 4.00 4.00 bh

6 Pek. Pagar Stainlessteel dia.3" dan 4x4cm' = 3.50 x 1.73 x 2.00 = 12.11 13.67 m2
= 0.45 x 1.73 x 2.00 = 1.56
V PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Tembok = Volume Pek. Acian = 287.43 287.43 m2

PEKERJAAN PINTU GERBANG DAN POS JAGA ( 3 unit )


I PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Pondasi Footplat Panjang x Lebar x Tinggi x Jumlah 20.74 m3
= 1.20 3.60 1.60 3.00 = 20.74

2 Pek. Galian Tanah Pondasi Batu Kali Panjang x Lebar x Tinggi x Jumlah 59.98 m3
= 35.70 0.70 0.80 3.00 = 59.98

3 Pek. Urugan Kembali = V. Galian - V. Urugan pasir - V. fp = 68.35 68.35 m3

4 Pek. Urugan Pasir Bawah Pondasi Footplat Panjang x Lebar x Tinggi x Jumlah 1.30 m3
= 1.20 3.60 0.10 3.00 = 1.30

5 Pek. Urugan Pasir Bawah Pondasi Batu Kali Panjang x Lebar x Tinggi x Jumlah 7.50 m3
= 35.70 0.70 0.10 3.00 = 7.50
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
II. PEKERJAAN PASANGAN DAN PLESTERAN
1 Pek. Batu Kosong Panjang x Lebar x Tinggi x Jumlah
= 35.70 0.70 0.20 3.00 = 14.99 14.99 m3

2 Pek. Pas. Pondasi Batu Kali, Camp.1PC:5PS Panjang x Lebar x Tinggi x Jumlah
= 35.70 0.40 0.55 3.00 = 23.56 23.56 m3

3 Pek. Pas. Dinding Bata 1/2Bt. Camp.1PC:5PS Panjang x Tinggi 312.57 m2


= 35.70 x 3.00 = 107.10
= 7.00 x 0.80 = 5.60
= 112.70
Pengurangan Panjang x lebar
P1 = 0.90 x 2.05 = 1.85
P2 = 0.80 x 2.05 = 1.64
= 3.35 x 1.50 = 5.03
= 8.51

4 Pek. Plesteran Dinding Bata, Camp.1PC:5PS = Volume Pas. Dinding Bata x 2.00 = 625.14 625.14 m2

5 Pek. Plesteran Kolom Gerbang, Camp.1PC:5PS Lebar x Tinggi x Jumlah 158.85 m2


= 12.75 2.80 3.00 = 107.10
= 2.30 3.75 6.00 = 51.75

6 Pek. Acian = Total Volume Plesteran = 783.99 783.99 m2

III. PEKERJAAN LANTAI DAN PLAFOND


1 Pek. Pas. Lantai Keramik 30x30cm Panjang x Lebar x Jumlah 11.70 m2
= 1.00 1.00 3.00 = 3.00
= 1.45 2.00 3.00 = 8.70

2 Pek. Pas. Lantai Keramik KM/WC 20x20cm Panjang x Lebar


= 1.00 1.50 3.00 = 4.50 4.50 m2

3 Pek. Pas. Keramik Dinding KM/WC 20x40cm Panjang x Tinggi


= 4.00 1.60 3.00 = 19.20 19.20 m2

4 Pek. Rangka Plafond Besi Hollow Panjang x Lebar 16.20 m2


NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
= 2.00 2.45 3.00 = 14.70
= 1.00 0.50 3.00 = 1.50

5 Pek. Plafond Gypsumboard t=9mm = 16.20 16.20 m2

6 Pek. List Plafond Gypsum 10cm = 41.70 41.70 m'

IV PEKERJAAN BETON
1 Pek. Lantai Kerja t=10cm, K.100 Panjang x Lebar x Tinggi x Jumlah 1.30 m3
= 1.20 3.60 0.10 3.00 = 1.30

2 Pek. Pondasi Footplat =1,00x3,40m', K.250 Panjang x Lebar x Tinggi x Jumlah 3.57 m3
= 1.00 3.40 0.35 3.00 = 3.57

3 Pek. Sloof Beton =15x25cm, K.250 Panjang x Lebar x Tinggi x Jumlah 4.66 m3
= 41.40 0.15 0.25 3.00 = 4.66

4 Pek. Kolom Beton Gerbang = 30x80cm', K.250 Panjang x Lebar x Tinggi x Jumlah 4.68 m3
= 0.30 0.80 6.50 3.00 = 4.68

5 Pek. Kolom Beton Gerbang = 30x50cm', K.250 Panjang x Lebar x Tinggi x Jumlah 5.85 m3
= 0.30 0.50 6.50 6.00 = 5.85

6 Pek. Kolom Beton Gerbang = 25x45cm', K.250 Panjang x Lebar x Tinggi x Jumlah 2.53 m3
= 0.45 0.25 3.75 6.00 = 2.53

7 Pek. Kolom Beton K.1 = 15x25cm', K.250 Panjang x Lebar x Tinggi x Jumlah 1.42 m3
= 0.15 0.25 3.15 12.00 = 1.42

8 Pek. Kolom Beton KP = 13x13cm', K.250 Panjang x Lebar x Tinggi x Jumlah 0.80 m3
= 0.13 0.13 3.15 15.00 = 0.80

9 Pek. Balok Beton = 15x25cm, K.250 Panjang x Lebar x Tinggi x Jumlah 1.00 m3
= 8.90 0.15 0.25 3.00 = 1.00

10 Pek. Balok Latei Beton = 13x15cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.33 m3
= 5.60 0.13 0.15 3.00 = 0.33
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5

11 Pek. Plat Dak Pos Jaga t=10cm, K.250 Panjang x Lebar x Tinggi x Jumlah 1.94 m3
= 2.40 2.70 0.10 2.00 = 1.30
= 2.40 2.70 0.10 1.00 = 0.65

12 Pek. Plat Sunscreen t=7cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.66 m3
= 6.95 0.45 0.07 3.00 = 0.66

V. PEKERJAAN STAINLESSTEEL DAN ALLUMINIUM


1 Pek. Pintu Gerbang Stainlessteel 6.50 x 2.00 x 3.00 = 39.00 39.00 m2

2 Pek. Tiang Pipa Pintu Gerbang Stainlessteel dia.4" = 30.00 30.00 m'

3 Pek. Kusen Pintu Alluminium 4" Panjang x Jumlah 72.30 m'


P1 = 5.00 1.00 = 5.00
P2 = 4.90 1.00 = 4.90
J1 = 14.20 1.00 = 14.20

4 Pek. Daun Pintu Kaca Aluminium = 0.80 x 2.00 3.00 = 4.80 4.80 m2

5 Pek. Daun Pintu Aluminium KM/WC = 0.70 x 2.00 3.00 = 4.20 4.20 m2

6 Pek. Kaca Polos 5mm = 3.20 x 1.40 3.00 = 13.44 13.44 m2

7 Pek. Kunci Pintu = 6.00 6.00 bh

8 Pek. Engsel Pintu = 18.00 18.00 bh

VI. PEKERJAAN PENGECATAN


1 Pek. Cat Dinding Tembok = Volume Pek. Acian = 783.99 783.99 m2

PEKERJAAN PAGAR SAMPING KANAN DAN BELAKANG


I PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Pondasi Batu Kali Panjang x Lebar x Tinggi 242.42 m3
= 52.60 x 0.70 x 0.80 = 88.37
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
= 5.60 x 0.70 x 0.80 = 9.41
= 86.10 x 0.70 x 0.80 = 144.65

2 Pek. Urugan Kembali = V. Galian - V. pondasi - V. Urugan Pasir 206.45 m3


= 88.37 - 1.89 - 11.05 = 75.43
= 9.41 - 1.89 - 1.18 = 6.34
= 144.65 - 1.89 - 18.08 = 124.68

3 Pek. Urugan Pasir Bawah Pondasi Batu Kali Panjang x Lebar x Tinggi 30.30 m3
= 52.60 x 0.70 x 0.10 = 11.05
= 5.60 x 0.70 x 0.10 = 1.18
= 86.10 x 0.70 x 0.10 = 18.08

II. PEKERJAAN PASANGAN DAN PLESTERAN


1 Pek. Batu Kosong = 144.30 x 0.70 x 0.20 x 1.00 = 20.20 20.20 m3

2 Pek. Pas. Pondasi Batu Kali, Camp.1PC:5PS = 118.40 x 0.50 x 0.75 x 1.00 = 44.40 60.59 m3
= 25.90 x 0.50 x 1.25 x 1.00 = 16.19
3 Pek. Pas. Dinding Bata 1/2Bt. Camp.1PC:5PS = 144.30 x x 1.00 x 1.00 = 144.30 144.30 m2

4 Pek. Plesteran Dinding Bata, Camp.1PC:5PS = Volume Pas. Dinding bata x 2.00 = 288.60 288.60 m2

5 Pek. Plesteran Kolom Beton Dan Gapura, Camp.1P = 1.20 x 2.70 x 41.00 = 132.84 132.84 m2

6 Pek. Acian = Total Volume Plesteran = 421.44 421.44 m2

III PEKERJAAN BETON


1 Pek. Sloof Beton =15x25cm, K.250 Panjang x Lebar x Tinggi x Jumlah 5.41 m3
= 52.60 x 0.15 x 0.25 x 1.00 = 1.97
= 5.60 x 0.15 x 0.25 x 1.00 = 0.21
= 86.10 x 0.15 x 0.25 x 1.00 = 3.23

2 Pek. Kolom Beton K.2 = 20x40cm', Panjang x Lebar x Tinggi x Jumlah 9.35 m3
= 2.85 x 0.20 x 0.40 x 41.00 = 9.35
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5

IV. PEKERJAAN PAGAR STAINLESSTEEL


1 Pek. Pagar Stainlessteel dia.3" dan 4x4cm' = 3.50 x 1.73 x 34.00 = 205.87 205.87 m2

V. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Tembok = Volume Pek. Acian = 421.44 421.44 m2

PEKERJAAN PAGAR SAMPING KIRI


I PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Pondasi Batu Kali Panjang x Lebar x Tinggi 65.30 m3
= 116.60 x 0.70 x 0.80 = 65.30

2 Pek. Urugan Kembali = 57.13 57.13 m3

3 Pek. Urugan Pasir Bawah Pondasi Batu Kali Panjang x Lebar x Tinggi 8.16 m3
= 116.60 x 0.70 x 0.10 = 8.16

II. PEKERJAAN PASANGAN DAN PLESTERAN


1 Pek. Batu Kosong = 116.60 x 0.70 x 0.20 = 16.32 16.32 m3

2 Pek. Pas. Pondasi Batu Kali, Camp.1PC:5PS = 116.60 x 0.50 x 0.80 = 46.64 46.64 m3

3 Pek. Pas. Dinding Bata 1/2Bt. Camp.1PC:5PS = 116.60 x x 2.70 = 314.82 314.82 m2

4 Pek. Plesteran Dinding Bata, Camp.1PC:5PS = Volume Pas. Dinding bata x 2.00 = 629.64 629.64 m2

5 Pek. Plesteran Kolom Beton Dan Gapura, Camp.1P = 1.20 x 2.70 x 32.00 = 103.68 103.68 m2

6 Pek. Acian = Total Volume Plesteran = 733.32 733.32 m2

III PEKERJAAN BETON

1 Pek. Sloof Beton =15x25cm, K.250 Panjang x Lebar x Tinggi 4.37 m3


= 116.60 x 0.15 x 0.25 = 4.37

2 Pek. Kolom Beton K.2 = 20x40cm', K.250 Panjang x Lebar x Tinggi x Jumlah 7.30 m3
= 2.85 x 0.20 x 0.40 x 32.00 = 7.30

3 Pek. Ring Balok Beton = 13x15cm', K.250 Panjang x Lebar x Tinggi 2.27 m3
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
= 116.60 x 0.13 x 0.15 = 2.27
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5

IV. PEKERJAAN PENGECATAN


1 Pek. Cat Dinding Tembok = Volume Pek. Acian = 733.32 733.32 m2

PEKERJAAN SARANA DAN PRASARANA LUAR


I. AREA JALAN DAN PARKIR LUAR BANGUNAN
1 Pek. Pemadatan tanah - sub grade CBR 5% tiap 20 = Luasan Tanah - Luas Bangun - Luas Rumput
= 4,362.21 - 1,778.52 - 284.87 = 2,298.82 2,298.82 m2

2 Pek. Urugan Tanah Klas C CBR 30% t=30 cm = Luas x t


= 2,298.82 x 0.30 = 689.65 689.65 m3

3 Pek. Paving Block Press t=8 cm, K.200 = = 2,298.82 2,298.82 m2

4 Pekerjaan Kansteen = = 296.62 296.62 m'

5 Rumput + tanah subur = Luasan


= 284.87 = 284.87 284.87 m2

6 Pek. Pas. Pondasi Batu Kali, Camp.1PC:5PS (ramp = Panjang x Tinggi x Lebar x jumlah 49.85 m3
= 6.60 1.50 0.55 2.00 = 10.89
= 7.00 1.20 0.55 2.00 = 9.24
pas batu penahan tanaha = 3.73 0.50 0.30 10.00 = 5.60
= 4.58 0.50 0.30 8.00 = 5.50
pas.batu di area gwt = 11.30 1.50 0.50 2.00 = 16.95
pas.batu dibawah tangga = 8.00 0.70 0.30 = 1.68

7 Pek. Pas. Dinding Bata 1/2Bt (taman) = Panjang x Tinggi x jumlah 358.61 m2
taman di area gwt = 11.20 1.00 2.00 = 22.40
= 16.07 0.80 2.00 = 25.71
taman depan = 37.76 2.50 1.00 = 94.40
taman belakang = 99.08 1.20 1.00 = 118.90
taman belakang pinggir dinding = 108.00 0.90 1.00 = 97.20

PEKERJAAN TAMBAHAN
I Pekerjaan Waterprofing
Waterprofing Lantai 1 Panjang x Lebar 53.44 m2
area kamar mandi = 2.85 x 7.03 = 20.04
= 16.91 x 0.10 = 1.69
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
= 2.85 x 5.87 = 16.73
= 14.59 x 0.10 = 1.46
tempat wudhu = 1.00 x 3.50 = 3.50
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5

= 0.10 x 5.50 = 0.55


kamar mandi tambahan = 4.73 x 1.73 = 8.18
= 0.10 x 12.92 = 1.29
Waterprofing Lantai 2 = 43.97 43.97 m2
Waterprofing Lantai 3 = 43.97 43.97 m2
Waterprofing Lantai 4 Panjang x Lebar 694.24 m2
Plat Dak = 16.45 x 3.55 = 58.40
= 6.60 x 44.15 = 291.39
= 6.50 x 30.40 = 197.60
= 1.30 x 73.00 = 94.90
= 19.35 x 1.60 = 30.96
= 1.30 x 16.15 = 21.00

II Pekerjaan Granite Pintu Lift


Granite Pintu Lift Basement Panjang x Lebar - Void
= 5.50 x 3.50 - 2.00 = 17.25 17.25 m2

Granite Pintu Lift Lantai 1 Panjang x Lebar - Void


= 5.50 x 3.60 - 2.00 = 17.80 17.80 m2

Granite Pintu Lift Lantai 2 Panjang x Lebar - Void


= 5.50 x 3.75 - 2.00 = 18.63 18.63 m2

Granite Pintu Lift Lantai 3 Panjang x Lebar - Void


= 5.50 x 3.75 - 2.00 = 18.63 18.63 m2

KPA Bid. Cipta Karya Pejabat Pelaksana Pengawas Utama Bid. Cipta Karya Konsultan Pengawas
DPU Kab. Lombok Timur Teknis Kegiatan (PPTK) DPU Kab. Lombok Timur CV. Danasady Consultant
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5

Hj. Kartini, ST., MH Hafid Wahyu Widodo, ST Ali Fikri, ST Muhamad Sapardi, ST
NIP. 19631231 1991022 015 NIP. 19771003 201001 1 007 NIP. 19770202 200604 1 013 Team Leader
K UP VOLUME PEKERJAAN

KETERANGAN
5

Basement - 0,5 dari tanah luar ,


tebal plat basement 20 cm , balok sloof
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5

6.6
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5

13.6
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5

-
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5

32.37
537.34

0.5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5

Selong, April 2017

Kontraktor Pelaksana
PT. Damai Indah Utama
KETERANGAN
5

S. Ali Asgar, ST
Project Manager

Anda mungkin juga menyukai