K. PEKERJAAN TAMBAH
I. JUMLAH TOTAL (A + B)
II. DIBULATKAN
Konsultan Pengawas
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR DPRD KABUPATEN L
LOKASI : JALAN LALU MUCHDAR NO. 1 SELONG
TAHUN ANGGARAN : 2016
1 2
Muhamad Sapardi, ST
Team Leader
3 4
Rp 6,244,977,975.12 Rp 6,252,267,524.86
Rp 45,756,456.10 Rp 45,756,456.10
Rp 614,011,626.12 Rp 617,849,697.41
Rp 781,149,819.41 Rp 816,840,445.09
Rp 567,936,178.89 Rp 546,183,631.35
Rp 3,887,413,736.57 Rp 3,791,351,367.96
Rp 31,149,295.80 Rp 30,884,221.59
Rp 28,035,275.00 Rp 27,144,275.00
Rp 289,525,587.22 Rp 376,257,430.36
Rp 5,577,159,678.87 Rp 5,558,204,889.73
Rp 561,910,110.06 Rp 581,394,558.67
Rp 991,683,870.87 Rp 966,638,732.35
Rp 194,597,968.90 Rp 202,783,526.69
Rp 580,699,375.00 Rp 627,573,703.75
Rp 2,631,195,941.33 Rp 2,567,641,572.94
Rp 210,352,307.85 Rp 214,113,768.08
Rp 115,426,683.50 Rp 112,816,748.50
Rp 291,293,421.36 Rp 285,242,278.75
Rp 4,810,840,042.52 Rp 4,724,865,362.33
Rp 474,987,225.64 Rp 488,472,055.78
Rp 963,494,274.16 Rp 954,013,959.51
Rp 2,658,244,727.94 Rp 2,586,969,381.31
Rp 226,130,043.31 Rp 227,445,383.16
Rp 176,487,801.50 Rp 146,849,801.50
G KANTOR DPRD KABUPATEN LOMBOK TIMUR
3 4
Rp 311,495,969.96 Rp 321,114,781.08
Rp 3,664,779,293.82 Rp 3,528,662,417.25
Rp 557,289,065.25 Rp 562,645,180.27
Rp 955,993,090.97 Rp 884,926,643.87
Rp 1,485,354,884.61 Rp 1,415,343,782.79
Rp 188,523,993.69 Rp 203,482,785.77
Rp 117,525,680.00 Rp 122,982,709.00
Rp 360,092,579.31 Rp 339,281,315.55
Rp 2,587,842,475.10 Rp 2,643,642,737.19
Rp 161,255,496.72 Rp 169,354,003.65
Rp 89,881,339.75 Rp 90,397,965.59
Rp 219,239,500.76 Rp 71,375,241.51
Rp 10,964,603.29 Rp 9,900,122.25
Rp 37,504,990.50 Rp 39,197,322.50
Rp 2,002,523,578.69 Rp 2,180,903,208.54
Rp 66,472,965.38 Rp 82,514,873.16
Rp 196,166,450.63 Rp 190,967,457.31
Rp 3,060,417.60 Rp 3,060,338.70
Rp 43,213,634.21 Rp 43,213,583.33
Rp 102,596,948.01 Rp 95,120,484.47
Rp 31,285,188.49 Rp 33,562,788.49
Rp 16,010,262.32 Rp 16,010,262.32
Rp 483,346,503.29 Rp 482,002,360.23
Rp 6,953,406.12 Rp 6,749,416.62
Rp 122,497,070.99 Rp 122,497,070.99
Rp 12,826,040.02 Rp 12,826,040.02
G KANTOR DPRD KABUPATEN LOMBOK TIMUR
3 4
Rp 208,957,426.99 Rp 207,817,273.44
Rp 88,442,434.59 Rp 88,442,434.59
Rp 43,670,124.58 Rp 43,670,124.58
G KANTOR DPRD KABUPATEN LOMBOK TIMUR
3 4
Rp 1,436,551,524.49 Rp 523,774,870.67
Rp 20,781,797.40 Rp 20,188,242.90
Rp 237,103,119.40 Rp 96,856,689.64
Rp 346,872,549.32 Rp 115,623,718.67
Rp 761,368,400.00 Rp 267,631,000.00
Rp 70,425,658.37 Rp 23,475,219.46
Rp 825,538,437.33 Rp 294,438,786.15
Rp 15,892,465.20 Rp 5,462,826.60
Rp 349,676,756.13 Rp 132,787,864.16
Rp 338,193,186.15 Rp 115,340,411.42
Rp 121,776,029.86 Rp 40,847,683.97
Rp 886,193,426.83 Rp 870,405,626.83
Rp 571,577,778.03 Rp 555,789,978.03
Rp 314,615,648.80 Rp 314,615,648.80
Rp - Rp 1,693,735,572.94
Rp 26,713,395,807.99 Rp 26,762,967,605.50
Rp 6,558,655,042.75 Rp 6,661,175,342.78
Rp 33,272,050,850.74 Rp 33,424,142,948.28
Rp 33,272,050,000.00 Rp 33,424,142,000.00
G KANTOR DPRD KABUPATEN LOMBOK TIMUR
3 4
Pejabat Pelaksana
Teknis Kegiatan (PPTK)
5=4-3
Rp 7,289,549.74
Rp -
Rp 3,838,071.29
Rp 35,690,625.68
Rp (21,752,547.55)
Rp (96,062,368.62)
Rp (265,074.21)
Rp (891,000.00)
Rp 86,731,843.14
Rp (18,954,789.14)
Rp 19,484,448.61
Rp (25,045,138.52)
Rp 8,185,557.79
Rp 46,874,328.75
Rp (63,554,368.39)
Rp 3,761,460.24
Rp (2,609,935.00)
Rp (6,051,142.61)
Rp (85,974,680.18)
Rp 13,484,830.14
Rp (9,480,314.65)
Rp (71,275,346.64)
Rp 1,315,339.85
Rp (29,638,000.00)
SELISIH
5=4-3
Rp 9,618,811.12
Rp (136,116,876.57)
Rp 5,356,115.02
Rp (71,066,447.10)
Rp (70,011,101.82)
Rp 14,958,792.08
Rp 5,457,029.00
Rp (20,811,263.76)
Rp 55,800,262.09
Rp 8,098,506.93
Rp 516,625.84
Rp (147,864,259.26)
Rp (1,064,481.05)
Rp 1,692,332.00
Rp 178,379,629.85
Rp 16,041,907.77
Rp (5,198,993.32)
Rp (78.90)
Rp (50.88)
Rp (7,476,463.54)
Rp 2,277,600.00
Rp -
Rp (1,344,143.05)
Rp (203,989.50)
Rp -
Rp -
SELISIH
5=4-3
Rp (1,140,153.55)
Rp -
Rp -
SELISIH
5=4-3
Rp (912,776,653.82)
Rp (593,554.50)
Rp (140,246,429.75)
Rp (231,248,830.65)
Rp (493,737,400.00)
Rp (46,950,438.91)
Rp (531,099,651.18)
Rp (10,429,638.60)
Rp (216,888,891.96)
Rp (222,852,774.73)
Rp (80,928,345.89)
Rp (15,787,800.00)
Rp (15,787,800.00)
Rp -
Rp 1,693,735,572.94
Rp 49,571,797.51
Rp 102,520,300.03
Rp 152,092,097.54
Rp 152,092,000.00
5=4-3
S. Ali Asgar, ST
Project Manager
Pengawas Utama
Bid. Cipta Karya
DPU Kab. Lombok Timur
Ali Fikri, ST
NIP. 19770202 200604 1 013
RENCANA ANGGARAN BIAYA
(RAB)
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR DPRD KABUPATEN LOM
LOKASI : JALAN LALU MUCHDAR NO. 1 SELONG
TAHUN ANGGARAN : 2016
VOLUME
NO. URAIAN PEKERJAAN
KONTRAK CCO
1 2 3 4
VOLUME
NO. URAIAN PEKERJAAN
KONTRAK CCO
1 2 3 4
VOLUME
NO. URAIAN PEKERJAAN
KONTRAK CCO
1 2 3 4
VOLUME
NO. URAIAN PEKERJAAN
KONTRAK CCO
1 2 3 4
VOLUME
NO. URAIAN PEKERJAAN
KONTRAK CCO
1 2 3 4
VOLUME
NO. URAIAN PEKERJAAN
KONTRAK CCO
1 2 3 4
VOLUME
NO. URAIAN PEKERJAAN
KONTRAK CCO
1 2 3 4
V. PEKERJAAN BETON
1 Pek. Kolom Beton K.4 = 50x50cm, K.250 55.463 55.463
2 Pek. Kolom Beton K.8 = 30x30cm, K.250 0.783 2.349
3 Pek. Kolom Beton K.9 = 25x25cm, K.250 0.963 0.963
4 Pek. Kolom Beton K.10 = 15x45cm, K.250 1.175 1.175
5 Pek. Kolom Beton K.11 = dia.50cm, K.250 13.662 13.666
6 Pek. Kolom Beton K.12 = dia.50cm, K.250 5.575 8.993
7 Pek. Kolom Beton Praktis KP.1 =13x13cm, K.250 7.866 7.646
8 Pek. Balok Beton B.1 = 25x75cm, K.250 3.375 3.150
9 Pek. Balok Beton B.2 = 25x75cm, K.250 4.781 4.436
10 Pek. Balok Beton B.3 = 25x60cm, K.250 18.000 17.325
11 Pek. Balok Beton B.4 = 25x60cm, K.250 17.520 15.624
12 Pek. Balok Beton B.5 = 25x60cm, K.250 11.828 9.750
13 Pek. Balok Beton B.6 = 25x50cm, K.250 3.938 3.588
14 Pek. Balok Beton B.7 = 25x50cm, K.250 5.250 4.750
15 Pek. Balok Beton B.8 = 25x50cm, K.250 3.563 3.345
16 Pek. Balok Beton B.9 = 25x50cm, K.250 1.788 1.433
17 Pek. Balok Beton B.10 = 25x60cm, K.250 8.250 7.395
18 Pek. Balok Beton B.12 = 25x50cm, K.250 8.188 8.035
19 Pek. Balok Beton B.13 = 25x50cm, K.250 12.688 12.238
20 Pek. Balok Beton B.14 = 25x50cm, K.250 0.750 0.675
21 Pek. Balok Beton B.16 = 20x45cm, K.250 20.097 19.504
22 Pek. Balok Beton B.17 = 20x45cm, K.250 7.515 7.401
23 Pek. Balok Beton B.20 = 20x40cm, K.250 3.520 2.688
24 Pek. Balok Beton B.22 = 15x30cm, K.250 5.796 5.861
25 Pek. Balok Beton BP = 15x25cm, K.250 3.375 2.940
26 Pek. Balok Praktis = 15x25cm, K.250 2.063 2.063
27 Pek. Balok Bordes Tangga = 15x25cm, K.250 1.013 0.990
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR DPRD KABUPATEN LOM
LOKASI : JALAN LALU MUCHDAR NO. 1 SELONG
TAHUN ANGGARAN : 2016
VOLUME
NO. URAIAN PEKERJAAN
KONTRAK CCO
1 2 3 4
VOLUME
NO. URAIAN PEKERJAAN
KONTRAK CCO
1 2 3 4
VOLUME
NO. URAIAN PEKERJAAN
KONTRAK CCO
1 2 3 4
VOLUME
NO. URAIAN PEKERJAAN
KONTRAK CCO
1 2 3 4
VOLUME
NO. URAIAN PEKERJAAN
KONTRAK CCO
1 2 3 4
VOLUME
NO. URAIAN PEKERJAAN
KONTRAK CCO
1 2 3 4
VOLUME
NO. URAIAN PEKERJAAN
KONTRAK CCO
1 2 3 4
VOLUME
NO. URAIAN PEKERJAAN
KONTRAK CCO
1 2 3 4
VOLUME
NO. URAIAN PEKERJAAN
KONTRAK CCO
1 2 3 4
VOLUME
NO. URAIAN PEKERJAAN
KONTRAK CCO
1 2 3 4
VOLUME
NO. URAIAN PEKERJAAN
KONTRAK CCO
1 2 3 4
VOLUME
NO. URAIAN PEKERJAAN
KONTRAK CCO
1 2 3 4
V. PEKERJAAN PENGECATAN
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR DPRD KABUPATEN LOM
LOKASI : JALAN LALU MUCHDAR NO. 1 SELONG
TAHUN ANGGARAN : 2016
VOLUME
NO. URAIAN PEKERJAAN
KONTRAK CCO
1 2 3 4
VOLUME
NO. URAIAN PEKERJAAN
KONTRAK CCO
1 2 3 4
VOLUME
NO. URAIAN PEKERJAAN
KONTRAK CCO
1 2 3 4
V. PEKERJAAN PENGECATAN
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR DPRD KABUPATEN LOM
LOKASI : JALAN LALU MUCHDAR NO. 1 SELONG
TAHUN ANGGARAN : 2016
VOLUME
NO. URAIAN PEKERJAAN
KONTRAK CCO
1 2 3 4
VOLUME
NO. URAIAN PEKERJAAN
KONTRAK CCO
1 2 3 4
VOLUME JUM
SAT. KODE ANALISA HARGA SATUAN
SELISIH KONTRAK
5=4-3 6 5 7 8
Rp 6,244,977,975.12
Rp 45,756,456.10
- - Ls. Rp 10,000,000.00 Rp 10,000,000.00
- unit Ls. Rp 1,500,000.00 Rp 1,500,000.00
- m' A.6.4 Rp 64,513.10 Rp 14,838,013.00
- m' A.6.1 Rp 64,513.10 Rp 19,418,443.10
Rp 614,011,626.12
(80.28) m3 SNI 2835:08.6.3 Rp 72,756.00 Rp 226,601,836.02
2,345.19 m3 SNI 2835:08.6.1 Rp 49,500.00 Rp 54,821,250.00
17.10 m3 SNI 2835:08.6.1 Rp 49,500.00 Rp 7,078,500.00
(680.46) m3 SNI 2835:08.6.9 Rp 16,500.00 Rp 53,749,492.50
(1.83) m3 SNI 2835:08.6.11 Rp 157,800.00 Rp 14,042,148.60
0.95 m3 SNI 2835:08.6.11 Rp 157,800.00 Rp 2,256,540.00
- m3 SNI 2835:08.6.11 Rp 157,800.00 Rp 34,952,700.00
(664.50) m3 SNI 2835:08.6.15 Rp 144,300.00 Rp 95,887,350.00
- m3 SNI 2835:08.6.15 Rp 144,300.00 Rp 124,621,809.00
Rp 781,149,819.41
1.90 m3 SNI 2836:08.6.9 Rp 313,716.00 Rp 8,972,277.60
16.01 m3 SNI 2836:08.6.3 Rp 617,940.00 Rp 29,160,588.60
- m2 SNI 6897:08.6.2 Rp 224,050.00 Rp 174,787,006.25
(53.59) m2 SNI 6897:08.6.8 Rp 108,125.00 Rp 20,704,856.25
30.89 m2 SNI 6897:08.6.10 Rp 101,765.00 Rp 74,775,904.35
(107.18) m2 SNI 2837:08.6.14 Rp 67,233.00 Rp 130,649,182.59
ABUPATEN LOMBOK TIMUR
VOLUME JUM
SAT. KODE ANALISA HARGA SATUAN
SELISIH KONTRAK
5=4-3 6 5 7 8
Rp 567,936,178.89
(5.76) m2 SNI 7395:08.6.13.a Rp 362,955.24 Rp 351,777,307.47
(73.23) m2 SNI 7395:08.6.13 Rp 362,955.24 Rp 152,622,678.42
- m2 SNI 7395:08.6.13 Rp 362,955.24 Rp 6,260,977.89
106.06 m' SNI 7395:08.6.28 Rp 51,092.67 Rp 17,192,683.46
(28.30) m2 SNI 7395:08.6.35 Rp 225,462.67 Rp 11,836,790.18
(1.60) m2 SNI 7395:08.6.36 Rp 229,185.50 Rp 2,062,669.50
9.18 m2 SNI 7395:08.6.54 Rp 251,446.00 Rp 26,183,071.98
35.94 m2 Ls. Rp 80,000.00 Rp -
35.94 m2 SNI 2839:08.6.1.a Rp 49,503.96 Rp -
24.00 m' SNI 2839:08.6.8 Rp 53,502.75 Rp -
Rp 3,887,413,736.57
(0.92) m3 SNI 7394:08.6.4 Rp 788,794.00 Rp 35,096,600.24
16.18 m3 SNI 7394:08.6.32.e Rp 2,115,873.63 Rp 475,119,423.62
6.34 m3 SNI 7394:08.6.28 Rp 2,568,193.71 Rp 200,904,657.55
4.31 m3 SNI 7394:08.6.28.a Rp 2,588,557.96 Rp 480,811,698.28
0.57 m3 SNI 7394:08.6.28.b Rp 2,689,073.28 Rp 34,957,952.64
0.11 m3 SNI 7394:08.6.28.b Rp 2,689,073.28 Rp 7,548,228.70
1.38 m3 SNI 7394:08.6.28.c Rp 2,674,834.99 Rp 17,260,710.19
0.30 m3 SNI 7394:08.6.28.d Rp 3,431,932.42 Rp 4,118,318.90
0.01 m3 SNI 7394:08.6.28.e Rp 2,309,939.86 Rp 1,256,607.28
(0.10) m3 SNI 7394:08.6.29 Rp 5,422,354.36 Rp 7,808,190.28
(3.88) m3 SNI 7394:08.6.29.a Rp 5,025,537.31 Rp 220,118,534.18
(0.00) m3 SNI 7394:08.6.29.b Rp 5,573,213.21 Rp 11,313,622.82
ABUPATEN LOMBOK TIMUR
VOLUME JUM
SAT. KODE ANALISA HARGA SATUAN
SELISIH KONTRAK
5=4-3 6 5 7 8
VOLUME JUM
SAT. KODE ANALISA HARGA SATUAN
SELISIH KONTRAK
5=4-3 6 5 7 8
Rp 31,149,295.80
(0.01) m3 SNI 3434:08.6.1 Rp 21,604,081.25 Rp 11,731,016.12
(0.06) m2 SNI 3434:08.6.5 Rp 600,725.00 Rp 16,339,720.00
(0.03) m2 SNI 3434:08.6.12 Rp 549,742.80 Rp 3,078,559.68
Rp 28,035,275.00
- bh Ls. Rp 500,000.00 Rp 5,000,000.00
- bh Ls. Rp 2,000.00 Rp 192,000.00
- bh SNI-02.17.6.2 Rp 312,630.00 Rp 5,002,080.00
- bh SNI-02.17.6.5 Rp 123,785.00 Rp 7,798,455.00
- bh SNI-02.17.6.10 Rp 140,870.00 Rp 1,408,700.00
- bh SNI-02.17.6.9 Rp 129,565.00 Rp 2,073,040.00
(0.99) m2 Ls. Rp 900,000.00 Rp 6,561,000.00
ABUPATEN LOMBOK TIMUR
VOLUME JUM
SAT. KODE ANALISA HARGA SATUAN
SELISIH KONTRAK
5=4-3 6 5 7 8
Rp 289,525,587.22
- m2 SNI-02.14.6.9 Rp 62,667.50 Rp 5,997,029.08
1,557.06 m2 SNI-02.14.6.14 Rp 55,702.40 Rp 283,528,558.14
Rp 5,577,159,678.87
Rp 561,910,110.06
(55.75) m2 SNI 6897:08.6.8 Rp 108,125.00 Rp 30,126,328.13
(104.18) m2 SNI 6897:08.6.10 Rp 101,765.00 Rp 118,857,958.23
(55.75) m2 SNI 2837:08.6.14 Rp 67,233.00 Rp 18,732,794.63
(208.36) m2 SNI 2837:08.6.16 Rp 62,589.00 Rp 146,203,522.77
- m2 SNI 2837:08.6.16 Rp 62,589.00 Rp 27,205,372.86
21.84 m2 SNI 2837:08.6.27 Rp 28,515.00 Rp 86,948,565.33
(0.00) m2 Ls. Rp 300,000.00 Rp 10,683,000.00
174.27 m2 Ls. Rp 300,000.00 Rp 36,339,600.00
- m2 SNI 7395:08.6.57 Rp 363,805.00 Rp 69,204,806.13
- m2 SNI 7395:08.6.57 Rp 363,805.00 Rp 17,608,162.00
Rp 991,683,870.87
(1.84) m2 SNI 7395:08.6.13.a Rp 362,955.24 Rp 103,423,369.73
(29.37) m2 SNI 7395:08.6.13 Rp 362,955.24 Rp 508,500,291.24
- m2 SNI 7395:08.6.13 Rp 362,955.24 Rp 39,977,704.91
38.02 m' SNI 7395:08.6.28 Rp 51,092.67 Rp 21,949,411.03
- m2 SNI 7395:08.6.35 Rp 225,462.67 Rp 8,708,495.63
- m2 SNI 7395:08.6.36 Rp 229,185.50 Rp 3,552,375.25
5.94 m2 SNI 7395:08.6.54 Rp 251,446.00 Rp 36,786,549.80
(132.45) m2 Ls. Rp 80,000.00 Rp 145,366,800.00
(132.45) m2 SNI 2839:08.6.1.a Rp 49,503.96 Rp 89,952,903.16
- m' SNI 2839:08.6.8 Rp 53,502.75 Rp 33,465,970.13
ABUPATEN LOMBOK TIMUR
VOLUME JUM
SAT. KODE ANALISA HARGA SATUAN
SELISIH KONTRAK
5=4-3 6 5 7 8
Rp 194,597,968.90
13.60 m' SNI 7393:08.6.12 Rp 208,528.10 Rp 104,716,555.98
1.92 m2 SNI 7393:08.6.13 Rp 402,282.50 Rp 9,268,588.80
10.10 m2 SNI 7393:08.6.13 Rp 402,282.50 Rp 67,364,618.32
- bh SNI-02.17.6.17 Rp 173,528.40 Rp 2,082,340.80
- bh SNI-02.17.6.5 Rp 123,785.00 Rp 4,456,260.00
- bh Ls. Rp 267,140.00 Rp 3,205,680.00
6.87 m2 Ls. Rp 75,000.00 Rp 3,503,925.00
Rp 580,699,375.00
50.67 m2 Ls. Rp 925,000.00 Rp 571,349,375.00
- bh Ls. Rp 1,400,000.00 Rp 1,400,000.00
- bh Ls. Rp 225,000.00 Rp 900,000.00
- bh Ls. Rp 150,000.00 Rp 7,050,000.00
ABUPATEN LOMBOK TIMUR
VOLUME JUM
SAT. KODE ANALISA HARGA SATUAN
SELISIH KONTRAK
5=4-3 6 5 7 8
Rp 2,631,195,941.33
(0.00) m3 SNI 7394:08.6.30.c Rp 5,442,918.78 Rp 301,880,604.30
1.57 m3 SNI 7394:08.6.30.g Rp 7,908,829.69 Rp 6,192,613.65
(0.00) m3 SNI 7394:08.6.30.h Rp 9,142,321.75 Rp 8,804,055.85
(0.00) m3 SNI 7394:08.6.30.i Rp 9,142,668.88 Rp 10,742,635.93
0.00 m3 SNI 7394:08.6.30.j Rp 5,939,512.08 Rp 81,145,614.04
3.42 m3 SNI 7394:08.6.30.k Rp 5,643,586.86 Rp 31,462,996.74
(0.22) m3 SNI 7394:08.6.30.l Rp 12,233,968.14 Rp 96,232,393.39
(0.23) m3 SNI 7394:08.6.31 Rp 6,527,018.22 Rp 22,028,686.49
(0.34) m3 SNI 7394:08.6.31.a Rp 6,217,204.25 Rp 29,724,453.52
(0.68) m3 SNI 7394:08.6.31.b Rp 6,640,963.43 Rp 119,537,341.74
(1.90) m3 SNI 7394:08.6.31.c Rp 6,253,695.97 Rp 109,564,753.39
(2.08) m3 SNI 7394:08.6.31.d Rp 6,060,062.24 Rp 71,678,416.17
(0.35) m3 SNI 7394:08.6.31.e Rp 6,709,172.68 Rp 26,420,722.01
(0.50) m3 SNI 7394:08.6.31.f Rp 6,476,812.20 Rp 34,003,264.05
(0.22) m3 SNI 7394:08.6.31.g Rp 6,244,451.73 Rp 22,248,981.51
(0.36) m3 SNI 7394:08.6.31.h Rp 6,012,091.25 Rp 10,749,619.16
(0.86) m3 SNI 7394:08.6.31.i Rp 6,077,762.83 Rp 50,141,543.35
(0.15) m3 SNI 7394:08.6.31.k Rp 6,168,500.10 Rp 50,507,678.82
(0.45) m3 SNI 7394:08.6.31.l Rp 6,003,723.70 Rp 76,175,246.31
(0.07) m3 SNI 7394:08.6.31.m Rp 5,838,947.29 Rp 4,379,210.47
(0.59) m3 SNI 7394:08.6.31.o Rp 7,532,077.69 Rp 151,372,165.34
(0.11) m3 SNI 7394:08.6.31.p Rp 7,303,221.58 Rp 54,883,710.17
(0.83) m3 SNI 7394:08.6.31.s Rp 7,376,193.11 Rp 25,964,199.75
0.07 m3 SNI 7394:08.6.31.u Rp 8,203,178.82 Rp 47,545,624.44
(0.43) m3 SNI 7394:08.6.31.x Rp 8,416,546.80 Rp 28,405,845.45
(0.00) m3 SNI 7394:08.6.31.x Rp 8,416,546.80 Rp 17,363,336.05
(0.02) m3 SNI 7394:08.6.31.x Rp 8,416,546.80 Rp 8,525,961.91
ABUPATEN LOMBOK TIMUR
VOLUME JUM
SAT. KODE ANALISA HARGA SATUAN
SELISIH KONTRAK
5=4-3 6 5 7 8
Rp 210,352,307.85
0.03 m3 SNI 3434:08.6.1 Rp 21,604,081.25 Rp 100,372,561.49
- m2 SNI 3434:08.6.6 Rp 441,675.00 Rp 22,048,416.00
3.84 m2 SNI 3434:08.6.5 Rp 600,725.00 Rp 1,153,392.00
1.40 m2 SNI 3434:08.6.12 Rp 549,742.80 Rp 5,387,479.44
- m2 SNI 3434:08.6.6 Rp 441,675.00 Rp 50,635,830.38
(0.00) m2 SNI 3434:08.6.7 Rp 706,325.00 Rp 3,448,984.98
- m2 SNI-02.17.6.17 Rp 173,528.40 Rp 5,643,143.57
- m' Ls. Rp 62,500.00 Rp 21,662,500.00
Rp 115,426,683.50
- m2 Ls. Rp 500,000.00 Rp 13,000,000.00
8.00 bh SNI-02.17.6.2 Rp 312,630.00 Rp 5,002,080.00
30.00 bh SNI-02.17.6.5 Rp 123,785.00 Rp 10,026,585.00
- bh SNI-02.17.6.6 Rp 73,625.00 Rp 25,179,750.00
1.00 bh SNI-02.17.6.9 Rp 129,565.00 Rp 4,664,340.00
(2.00) bh SNI-02.17.6.8 Rp 28,045.00 Rp 6,758,845.00
- bh SNI-02.17.6.10 Rp 140,870.00 Rp 3,662,620.00
- bh SNI-02.17.6.7 Rp 31,159.25 Rp 10,656,463.50
6.00 bh Ls. Rp 2,000.00 Rp 836,000.00
(9.90) m2 Ls. Rp 900,000.00 Rp 35,640,000.00
Rp 291,293,421.36
1.76 m2 SNI-02.14.6.9 Rp 62,667.50 Rp 20,228,442.33
ABUPATEN LOMBOK TIMUR
VOLUME JUM
SAT. KODE ANALISA HARGA SATUAN
SELISIH KONTRAK
5=4-3 6 5 7 8
Rp 4,810,840,042.52
Rp 474,987,225.64
(20.22) m2 SNI 6897:08.6.8 Rp 108,125.00 Rp 25,098,515.63
43.69 m2 SNI 6897:08.6.10 Rp 101,765.00 Rp 139,066,960.75
(20.22) m2 SNI 2837:08.6.14 Rp 67,233.00 Rp 15,606,460.13
87.38 m2 SNI 2837:08.6.16 Rp 62,589.00 Rp 171,061,995.90
- m2 SNI 2837:08.6.16 Rp 62,589.00 Rp 27,205,372.86
249.54 m2 SNI 2837:08.6.27 Rp 28,515.00 Rp 96,947,920.38
Rp 963,494,274.16
- m2 SNI 7395:08.6.13 Rp 362,955.24 Rp 554,232,651.48
ABUPATEN LOMBOK TIMUR
VOLUME JUM
SAT. KODE ANALISA HARGA SATUAN
SELISIH KONTRAK
5=4-3 6 5 7 8
Rp 2,658,244,727.94
(0.00) m3 SNI 7394:08.6.30.d Rp 5,210,558.30 Rp 288,993,194.99
(0.00) m3 SNI 7394:08.6.30.h Rp 9,142,321.75 Rp 4,973,423.03
(0.00) m3 SNI 7394:08.6.30.i Rp 9,142,668.88 Rp 10,742,635.93
(0.00) m3 SNI 7394:08.6.30.k Rp 5,643,586.86 Rp 67,469,080.91
(0.00) m3 SNI 7394:08.6.30.l Rp 12,233,968.14 Rp 93,540,920.40
(0.00) m3 SNI 7394:08.6.30.m Rp 8,992,769.61 Rp 3,525,165.69
0.75 m3 SNI 7394:08.6.31 Rp 6,527,018.22 Rp 22,028,686.49
0.47 m3 SNI 7394:08.6.31.a Rp 6,217,204.25 Rp 4,078,485.99
(1.34) m3 SNI 7394:08.6.31.b Rp 6,640,963.43 Rp 144,042,496.80
(0.30) m3 SNI 7394:08.6.31.c Rp 6,253,695.97 Rp 22,513,305.49
(4.13) m3 SNI 7394:08.6.31.d Rp 6,060,062.24 Rp 119,989,232.35
(0.13) m3 SNI 7394:08.6.31.f Rp 6,476,812.20 Rp 9,151,735.64
(0.06) m3 SNI 7394:08.6.31.g Rp 6,244,451.73 Rp 4,683,338.80
(1.78) m3 SNI 7394:08.6.31.k Rp 6,168,500.10 Rp 106,406,626.73
(0.33) m3 SNI 7394:08.6.31.l Rp 6,003,723.70 Rp 152,344,488.89
(0.07) m3 SNI 7394:08.6.31.m Rp 5,838,947.29 Rp 4,379,210.47
0.34 m3 SNI 7394:08.6.31.o Rp 7,532,077.69 Rp 78,295,947.59
(0.51) m3 SNI 7394:08.6.31.p Rp 7,303,221.58 Rp 116,340,319.77
(0.07) m3 SNI 7394:08.6.31.s Rp 7,376,193.11 Rp 32,455,249.68
ABUPATEN LOMBOK TIMUR
VOLUME JUM
SAT. KODE ANALISA HARGA SATUAN
SELISIH KONTRAK
5=4-3 6 5 7 8
Rp 226,130,043.31
(0.08) m3 SNI 3434:08.6.1 Rp 21,604,081.25 Rp 105,643,957.31
- m2 SNI 3434:08.6.6 Rp 441,675.00 Rp 28,832,544.00
- m2 SNI 3434:08.6.5 Rp 600,725.00 Rp 3,460,176.00
- m2 SNI 3434:08.6.12 Rp 549,742.80 Rp 3,078,559.68
(2.80) m2 SNI 3434:08.6.6 Rp 441,675.00 Rp 59,520,123.00
37.44 m2 SNI-02.17.6.17 Rp 173,528.40 Rp 3,869,683.32
(36.35) m' Ls. Rp 62,500.00 Rp 21,725,000.00
Rp 176,487,801.50
- bh Ls. Rp 500,000.00 Rp 17,000,000.00
- bh SNI-02.17.6.2 Rp 312,630.00 Rp 7,503,120.00
- bh SNI-02.17.6.5 Rp 123,785.00 Rp 15,225,555.00
- bh SNI-02.17.6.6 Rp 73,625.00 Rp 29,302,750.00
- bh SNI-02.17.6.9 Rp 129,565.00 Rp 5,700,860.00
- bh SNI-02.17.6.8 Rp 28,045.00 Rp 7,824,555.00
- bh SNI-02.17.6.10 Rp 140,870.00 Rp 4,789,580.00
- bh SNI-02.17.6.7 Rp 31,159.25 Rp 12,401,381.50
ABUPATEN LOMBOK TIMUR
VOLUME JUM
SAT. KODE ANALISA HARGA SATUAN
SELISIH KONTRAK
5=4-3 6 5 7 8
Rp 311,495,969.96
- m2 SNI-02.14.6.9 Rp 62,667.50 Rp 21,700,501.90
249.54 m2 SNI-02.14.6.14 Rp 55,702.40 Rp 189,382,144.14
(76.86) m2 SNI-02.14.6.14 Rp 55,702.40 Rp 100,413,323.92
Rp 3,664,779,293.82
Rp 557,289,065.25
- m2 SNI 6897:08.6.8 Rp 108,125.00 Rp 25,098,515.63
- m2 SNI 6897:08.6.10 Rp 101,765.00 Rp 170,704,681.60
- m2 SNI 2837:08.6.14 Rp 67,233.00 Rp 15,606,460.13
- m2 SNI 2837:08.6.16 Rp 62,589.00 Rp 209,978,584.32
ABUPATEN LOMBOK TIMUR
VOLUME JUM
SAT. KODE ANALISA HARGA SATUAN
SELISIH KONTRAK
5=4-3 6 5 7 8
Rp 955,993,090.97
- m2 SNI 7395:08.6.13 Rp 362,955.24 Rp 554,232,651.48
- m2 SNI 7395:08.6.13 Rp 362,955.24 Rp 39,977,704.91
- m' SNI 7395:08.6.28 Rp 51,092.67 Rp 32,196,046.00
- m2 SNI 7395:08.6.35 Rp 225,462.67 Rp 8,708,495.63
(0.50) m2 SNI 7395:08.6.36 Rp 229,185.50 Rp 3,982,785.62
2.09 m2 SNI 7395:08.6.54 Rp 251,446.00 Rp 31,732,485.20
(551.92) m2 Ls. Rp 80,000.00 Rp 149,014,000.00
(551.92) m2 SNI 2839:08.6.1.a Rp 49,503.96 Rp 92,209,788.69
- m' SNI 2839:08.6.8 Rp 53,502.75 Rp 43,939,133.44
Rp 1,485,354,884.61
- m3 SNI 7394:08.6.30.e Rp 6,675,303.76 Rp 236,946,582.26
0.25 m3 SNI 7394:08.6.30.h Rp 9,142,321.75 Rp 25,196,238.74
0.54 m3 SNI 7394:08.6.30.i Rp 9,142,668.88 Rp 10,742,635.93
(0.00) m3 SNI 7394:08.6.30.l Rp 12,233,968.14 Rp 169,085,673.66
0.18 m3 SNI 7394:08.6.30.m Rp 8,992,769.61 Rp 3,525,165.69
(0.06) m3 SNI 7394:08.6.31.c Rp 6,253,695.97 Rp 6,097,353.57
(0.30) m3 SNI 7394:08.6.31.d Rp 6,060,062.24 Rp 29,542,803.42
(0.15) m3 SNI 7394:08.6.31.f Rp 6,476,812.20 Rp 8,905,616.78
(0.06) m3 SNI 7394:08.6.31.i Rp 6,077,762.83 Rp 5,469,986.55
1.26 m3 SNI 7394:08.6.31.j Rp 5,803,135.48 Rp 36,559,753.52
0.07 m3 SNI 7394:08.6.31.k Rp 6,168,500.10 Rp 4,243,928.07
(0.50) m3 SNI 7394:08.6.31.l Rp 6,003,723.70 Rp 93,808,182.81
0.35 m3 SNI 7394:08.6.31.m Rp 5,838,947.29 Rp 62,768,683.37
(0.04) m3 SNI 7394:08.6.31.o Rp 7,532,077.70 Rp 4,406,265.45
ABUPATEN LOMBOK TIMUR
VOLUME JUM
SAT. KODE ANALISA HARGA SATUAN
SELISIH KONTRAK
5=4-3 6 5 7 8
Rp 188,523,993.69
0.57 m3 SNI 3434:08.6.1 Rp 21,604,081.25 Rp 93,480,859.57
- m2 SNI 3434:08.6.6 Rp 441,675.00 Rp 32,224,608.00
3.81 m2 SNI 3434:08.6.5 Rp 600,725.00 Rp 2,306,784.00
- m2 SNI 3434:08.6.12 Rp 549,742.80 Rp 6,157,119.36
0.36 m2 SNI 3434:08.6.6 Rp 441,675.00 Rp 31,146,921.00
17.98 m2 SNI-02.17.6.17 Rp 173,528.40 Rp 10,795,201.76
(47.40) m' Ls. Rp 62,500.00 Rp 12,412,500.00
Rp 117,525,680.00
(4.00) bh Ls. Rp 500,000.00 Rp 21,000,000.00
2.00 bh SNI-02.17.6.2 Rp 312,630.00 Rp 9,066,270.00
6.00 bh SNI-02.17.6.5 Rp 123,785.00 Rp 17,825,040.00
4.00 bh SNI-02.17.6.6 Rp 73,625.00 Rp 16,492,000.00
(8.00) bh SNI-02.17.6.9 Rp 129,565.00 Rp 7,514,770.00
78.00 bh SNI-02.17.6.8 Rp 28,045.00 Rp 1,121,800.00
- bh SNI-02.17.6.10 Rp 140,870.00 Rp 5,353,060.00
148.00 bh SNI-02.17.6.7 Rp 31,159.25 Rp 2,492,740.00
ABUPATEN LOMBOK TIMUR
VOLUME JUM
SAT. KODE ANALISA HARGA SATUAN
SELISIH KONTRAK
5=4-3 6 5 7 8
Rp 360,092,579.31
5.69 m2 A.4.7.1.5 Rp 65,134.00 Rp 21,572,250.53
187.84 m2 A.4.7.1.10 Rp 58,178.20 Rp 230,153,250.09
(551.92) m2 A.4.7.1.10 Rp 58,178.20 Rp 108,367,078.69
Rp 2,587,842,475.10
Rp 161,255,496.72
(1.30) m2 SNI 6897:08.6.10 Rp 101,765.00 Rp 54,000,579.60
(2.60) m2 SNI 2837:08.6.16 Rp 62,589.00 Rp 66,424,453.92
ABUPATEN LOMBOK TIMUR
VOLUME JUM
SAT. KODE ANALISA HARGA SATUAN
SELISIH KONTRAK
5=4-3 6 5 7 8
Rp 89,881,339.75
(5.03) m2 SNI 7395:08.6.13 Rp 362,955.24 Rp 76,982,806.40
(0.00) m2 SNI 7395:08.6.13 Rp 362,955.24 Rp 9,672,031.24
45.81 m' SNI 7395:08.6.28 Rp 51,092.67 Rp 3,226,502.11
Rp 219,239,500.76
- m3 SNI 7394:08.6.30.f Rp 6,041,703.07 Rp 61,867,039.44
0.25 m3 SNI 7394:08.6.30.h Rp 9,142,321.75 Rp 2,285,580.44
- m3 SNI 7394:08.6.30.i Rp 9,142,668.88 Rp 4,937,041.20
(0.18) m3 SNI 7394:08.6.30.m Rp 8,992,769.61 Rp 1,618,698.53
(25.44) m3 SNI 7394:08.6.31.v Rp 5,838,947.29 Rp 148,531,141.16
Rp 10,964,603.29
0.16 m3 SNI 3434:08.6.1 Rp 21,604,081.25 Rp 1,274,640.79
(1.92) m2 SNI 3434:08.6.5 Rp 600,725.00 Rp 3,460,176.00
(4.62) m2 SNI 3434:08.6.7 Rp 706,325.00 Rp 6,229,786.50
Rp 37,504,990.50
1.00 bh SNI-02.17.6.2 Rp 312,630.00 Rp 937,890.00
6.00 bh SNI-02.17.6.5 Rp 123,785.00 Rp 1,114,065.00
4.00 bh SNI-02.17.6.6 Rp 73,625.00 Rp 441,750.00
1.00 bh SNI-02.17.6.9 Rp 129,565.00 Rp 388,695.00
2.00 bh SNI-02.17.6.8 Rp 28,045.00 Rp 84,135.00
4.00 bh SNI-02.17.6.7 Rp 31,159.25 Rp 186,955.50
8.00 bh Ls. Rp 2,000.00 Rp 48,000.00
0.02 m2 Ls. Rp 900,000.00 Rp 34,303,500.00
ABUPATEN LOMBOK TIMUR
VOLUME JUM
SAT. KODE ANALISA HARGA SATUAN
SELISIH KONTRAK
5=4-3 6 5 7 8
Rp 2,002,523,578.69
(318.84) kg SNI 7393:08.6.2 Rp 26,405.20 Rp 65,400,399.36
2,045.45 kg SNI 7393:08.6.2 Rp 26,405.20 Rp 493,882,860.80
255.78 kg SNI 7393:08.6.2 Rp 26,405.20 Rp 46,050,668.80
198.58 kg SNI 7393:08.6.2 Rp 26,405.20 Rp 35,699,830.40
16.64 kg SNI 7393:08.6.1 Rp 26,405.20 Rp 471,445,675.82
418.09 kg SNI 7393:08.6.1 Rp 26,405.20 Rp 9,234,954.65
(11.32) kg SNI 7393:08.6.1 Rp 26,405.20 Rp 12,851,173.19
0.00 kg SNI 7393:08.6.1 Rp 26,405.20 Rp 34,886,127.76
(0.00) kg SNI 7393:08.6.1 Rp 26,405.20 Rp 1,499,313.66
20.86 m' Ls. 18,948.150 Rp 16,721,742.38
- m' Ls. 11,217.305 Rp 6,079,779.31
(6.00) bh Ls. Rp 25,000.00 Rp 6,450,000.00
39.00 bh Ls. Rp 6,500.00 Rp 11,368,500.00
(86.30) /10cm' SNI 7393:08.6.5 Rp 2,344.77 Rp 11,240,592.90
26.61 /100kg SNI 7393:08.6.3 Rp 33,812.20 Rp 14,974,983.82
337.58 m2 Ls. Rp 120,000.00 Rp 273,612,000.00
337.58 m2 SNI-02.8.6.30 Rp 200,967.15 Rp 458,225,198.72
- m' SNI-02.8.6.34 Rp 106,032.75 Rp 16,276,027.13
0.75 m' Ls. Rp 82,500.00 Rp 16,623,750.00
Rp 66,472,965.38
(5.655) m2 SNI-02.14.6.9 Rp 62,667.50 Rp 895,643.91
294.355 m2 SNI-02.14.6.14 Rp 55,702.40 Rp 65,577,321.47
Rp 196,166,450.63
Rp 3,060,417.60
- m3 SNI 2835:08.6.2 Rp 61,020.00 Rp 781,056.00
ABUPATEN LOMBOK TIMUR
VOLUME JUM
SAT. KODE ANALISA HARGA SATUAN
SELISIH KONTRAK
5=4-3 6 5 7 8
VOLUME JUM
SAT. KODE ANALISA HARGA SATUAN
SELISIH KONTRAK
5=4-3 6 5 7 8
Rp 43,213,634.21
- m3 SNI 2836:08.6.9 Rp 313,716.00 Rp 1,776,573.71
- m3 SNI 2836:08.6.3 Rp 617,940.00 Rp 5,499,048.06
(0.00) m2 SNI 6897:08.6.10 Rp 101,765.00 Rp 9,752,445.25
- m2 SNI 2837:08.6.16 Rp 62,589.00 Rp 11,996,120.69
- m2 SNI 2837:08.6.16 Rp 62,589.00 Rp 5,993,522.64
- m2 SNI 2837:08.6.27 Rp 28,515.00 Rp 8,195,923.88
Rp 102,596,948.01
- m3 SNI 7394:08.6.4 Rp 788,794.00 Rp 631,035.20
0.79 m3 SNI 7394:08.6.28.d Rp 3,431,932.42 Rp 8,274,389.06
(0.00) m3 SNI 7394:08.6.29.b Rp 5,573,213.21 Rp 8,454,564.44
- m3 SNI 7394:08.6.30.m Rp 8,992,769.61 Rp 12,814,696.69
- m3 SNI 7394:08.6.30.i Rp 9,142,668.88 Rp 8,338,114.02
- m3 SNI 7394:08.6.30.m Rp 8,992,769.61 Rp 6,609,685.66
0.00 m3 SNI 7394:08.6.30.l Rp 12,233,968.14 Rp 4,697,843.77
- m3 SNI 7394:08.6.30.l Rp 12,233,968.14 Rp 4,294,122.82
(0.80) m3 SNI 7394:08.6.31.x Rp 8,416,546.80 Rp 19,517,972.03
(0.65) m3 SNI 7394:08.6.32.b Rp 5,280,679.00 Rp 28,964,524.32
Rp 31,285,188.49
- m2 SNI 7395:08.6.13 Rp 362,955.24 Rp 5,081,373.36
- m2 SNI 7395:08.6.57 Rp 363,805.00 Rp 1,464,315.13
- bh Ls. Rp 1,400,000.00 Rp 1,400,000.00
- bh Ls. Rp 150,000.00 Rp 7,050,000.00
- bh Ls. Rp 200,000.00 Rp 800,000.00
1.75 m2 Ls. Rp 1,300,000.00 Rp 15,489,500.00
Rp 16,010,262.32
ABUPATEN LOMBOK TIMUR
VOLUME JUM
SAT. KODE ANALISA HARGA SATUAN
SELISIH KONTRAK
5=4-3 6 5 7 8
Rp 483,346,503.29
Rp 6,953,406.12
- m3 SNI 2835:08.6.2 Rp 61,020.00 Rp 1,265,310.72
- m3 SNI 2835:08.6.1 Rp 49,500.00 Rp 2,968,812.00
(12.36) m3 SNI 2835:08.6.9 Rp 16,500.00 Rp 1,331,748.00
- m3 SNI 2835:08.6.11 Rp 157,800.00 Rp 204,508.80
- m3 SNI 2835:08.6.11 Rp 157,800.00 Rp 1,183,026.60
Rp 122,497,070.99
- m3 SNI 2836:08.6.9 Rp 313,716.00 Rp 4,703,857.70
- m3 SNI 2836:08.6.3 Rp 617,940.00 Rp 14,559,902.28
- m2 SNI 6897:08.6.10 Rp 101,765.00 Rp 31,808,686.05
- m2 SNI 2837:08.6.16 Rp 62,589.00 Rp 39,126,887.46
- m2 SNI 2837:08.6.16 Rp 62,589.00 Rp 9,942,262.65
- m2 SNI 2837:08.6.27 Rp 28,515.00 Rp 22,355,474.85
Rp 12,826,040.02
- m2 SNI 7395:08.6.35 Rp 225,462.67 Rp 2,637,913.24
- m2 SNI 7395:08.6.36 Rp 229,185.50 Rp 1,031,334.75
- m2 SNI 7395:08.6.54 Rp 251,446.00 Rp 4,827,763.20
- m2 Ls. Rp 80,000.00 Rp 1,296,000.00
- m2 SNI 2839:08.6.1.a Rp 49,503.96 Rp 801,964.15
- m' SNI 2839:08.6.8 Rp 53,502.75 Rp 2,231,064.68
Rp 208,957,426.99
- m3 SNI 7394:08.6.4 Rp 788,794.00 Rp 1,022,277.02
0.10 m3 SNI 7394:08.6.28.d Rp 3,431,932.42 Rp 11,919,101.29
ABUPATEN LOMBOK TIMUR
VOLUME JUM
SAT. KODE ANALISA HARGA SATUAN
SELISIH KONTRAK
5=4-3 6 5 7 8
Rp 88,442,434.59
- m2 Ls. Rp 1,300,000.00 Rp 50,700,000.00
- m' Ls. Rp 325,000.00 Rp 9,750,000.00
- m' SNI 7393:08.6.12 Rp 208,528.10 Rp 15,076,581.63
- m2 SNI 7393:08.6.13 Rp 402,282.50 Rp 1,930,956.00
- m2 SNI 3434:08.6.12 Rp 549,742.80 Rp 2,308,919.76
ABUPATEN LOMBOK TIMUR
VOLUME JUM
SAT. KODE ANALISA HARGA SATUAN
SELISIH KONTRAK
5=4-3 6 5 7 8
Rp 43,670,124.58
- m2 SNI-02.14.6.14 Rp 55,702.40 Rp 43,670,124.58
Rp 1,436,551,524.49
Rp 20,781,797.40
- m3 SNI 2835:08.6.1 Rp 49,500.00 Rp 11,999,988.00
(35.97) m3 SNI 2835:08.6.9 Rp 16,500.00 Rp 3,999,996.00
- m3 SNI 2835:08.6.11 Rp 157,800.00 Rp 4,781,813.40
Rp 237,103,119.40
(40.40) m3 SNI 2836:08.6.9 Rp 313,716.00 Rp 19,013,071.90
(34.65) m3 SNI 2836:08.6.3 Rp 617,940.00 Rp 58,851,369.72
(288.60) m2 SNI 6897:08.6.10 Rp 101,765.00 Rp 44,054,068.50
(577.20) m2 SNI 2837:08.6.16 Rp 62,589.00 Rp 54,189,556.20
(265.68) m2 SNI 2837:08.6.16 Rp 62,589.00 Rp 24,942,968.28
(842.88) m2 SNI 2837:08.6.27 Rp 28,515.00 Rp 36,052,084.80
Rp 346,872,549.32
(10.82) m3 SNI 7394:08.6.29.b Rp 5,573,213.21 Rp 90,475,543.25
(18.70) m3 SNI 7394:08.6.30.i Rp 9,142,668.88 Rp 256,397,006.07
Rp 761,368,400.00
(379.80) m2 Ls. Rp 1,300,000.00 Rp 761,368,400.00
Rp 70,425,658.37
ABUPATEN LOMBOK TIMUR
VOLUME JUM
SAT. KODE ANALISA HARGA SATUAN
SELISIH KONTRAK
5=4-3 6 5 7 8
Rp 825,538,437.33
Rp 15,892,465.20
(120.09) m3 SNI 2835:08.6.1 Rp 49,500.00 Rp 9,176,706.00
(128.25) m3 SNI 2835:08.6.9 Rp 16,500.00 Rp 3,058,902.00
(15.01) m3 SNI 2835:08.6.11 Rp 157,800.00 Rp 3,656,857.20
Rp 349,676,756.13
(30.02) m3 SNI 2836:08.6.9 Rp 313,716.00 Rp 14,539,795.45
(26.19) m3 SNI 2836:08.6.3 Rp 617,940.00 Rp 45,005,188.14
(579.02) m2 SNI 6897:08.6.10 Rp 101,765.00 Rp 90,961,118.78
(1,158.03) m2 SNI 2837:08.6.16 Rp 62,589.00 Rp 111,888,477.63
(294.84) m2 SNI 2837:08.6.16 Rp 62,589.00 Rp 24,942,968.28
(1,452.87) m2 SNI 2837:08.6.27 Rp 28,515.00 Rp 62,339,207.85
Rp 338,193,186.15
(8.04) m3 SNI 7394:08.6.29.b Rp 5,573,213.21 Rp 69,185,868.79
(14.59) m3 SNI 7394:08.6.30.i Rp 9,142,668.88 Rp 200,114,736.45
(4.18) m3 SNI 7394:08.6.31.y Rp 10,672,746.85 Rp 68,892,580.92
Rp 121,776,029.86
(1,452.87) m2 SNI-02.14.6.14 Rp 55,702.40 Rp 121,776,029.86
Rp 886,193,426.83
Rp 571,577,778.03
- m2 SNI 2835:08.6.10 Rp 36,600.00 Rp 74,425,807.20
- m3 SNI 2835:08.6.15 Rp 144,300.00 Rp 88,029,926.40
- m2 SNI 6897:08.6.11 Rp 168,977.50 Rp 343,614,394.43
- m' Ls. Rp 110,000.00 Rp 32,627,650.00
ABUPATEN LOMBOK TIMUR
VOLUME JUM
SAT. KODE ANALISA HARGA SATUAN
SELISIH KONTRAK
5=4-3 6 5 7 8
Rp 314,615,648.80
- m3 SNI 2835:08.6.1 Rp 49,500.00 Rp 6,320,160.00
- m3 SNI 2835:08.6.9 Rp 16,500.00 Rp 702,240.00
- m3 Ls. Rp 20,500.00 Rp 1,744,960.00
- m3 SNI 2835:08.6.11 Rp 157,800.00 Rp 4,797,120.00
- m3 SNI 7394:08.6.4 Rp 788,794.00 Rp 11,989,668.80
- m' Ls. Rp 221,000.00 Rp 5,856,500.00
- m' Ls. Rp 174,000.00 Rp 48,285,000.00
- m' Ls. Rp 828,000.00 Rp 229,770,000.00
- bh Ls. Rp 425,000.00 Rp 2,550,000.00
- bh Ls. Rp 650,000.00 Rp 2,600,000.00
JUMLAH HARGA
CCO SELISIH
9 10 = 9 - 8
Rp 6,252,267,524.86 Rp 7,289,549.74
Rp 45,756,456.10 Rp -
Rp 10,000,000.00 Rp -
Rp 1,500,000.00 Rp -
Rp 14,838,013.00 Rp -
Rp 19,418,443.10 Rp -
###
Rp 617,849,697.41 Rp 3,838,071.29
Rp 220,761,275.36 Rp (5,840,560.66)
Rp 170,908,107.98 Rp 116,086,857.98
Rp 7,924,888.13 Rp 846,388.13
Rp 42,521,960.25 Rp (11,227,532.25)
Rp 13,752,901.20 Rp (289,247.40)
Rp 2,406,055.50 Rp 149,515.50
Rp 34,952,700.00 Rp -
Rp - Rp (95,887,350.00)
Rp 124,621,809.00 Rp -
###
Rp 816,840,445.09 Rp 35,690,625.68
Rp 9,566,769.42 Rp 594,491.82
Rp 39,051,876.94 Rp 9,891,288.34
Rp 174,787,006.25 Rp -
Rp 14,910,437.50 Rp (5,794,418.75)
Rp 77,919,832.26 Rp 3,143,927.91
Rp 123,443,149.65 Rp (7,206,032.94)
JUMLAH HARGA
CCO SELISIH
9 10 = 9 - 8
Rp 95,846,791.75 Rp 3,867,249.13
Rp 39,431,070.00 Rp 6,984,932.40
Rp 56,330,869.84 Rp (16,200,392.81)
Rp 185,552,641.48 Rp 40,409,580.58
###
Rp 546,183,631.35 Rp (21,752,547.55)
Rp 349,686,503.81 Rp (2,090,803.66)
Rp 126,044,409.88 Rp (26,578,268.54)
Rp 6,260,977.89 Rp -
Rp 22,611,469.85 Rp 5,418,786.39
Rp 5,455,294.76 Rp (6,381,495.41)
Rp 1,695,514.33 Rp (367,155.17)
Rp 28,491,346.26 Rp 2,308,274.28
Rp 2,875,000.00 Rp 2,875,000.00
Rp 1,779,048.56 Rp 1,779,048.56
Rp 1,284,066.00 Rp 1,284,066.00
Rp 3,791,351,367.96 Rp (96,062,368.62)
Rp 34,373,276.14 Rp (723,324.10)
Rp 509,350,450.38 Rp 34,231,026.76
Rp 217,176,732.89 Rp 16,272,075.35
Rp 491,955,440.30 Rp 11,143,742.02
Rp 36,504,169.78 Rp 1,546,217.14
Rp 7,852,093.98 Rp 303,865.28
Rp 20,964,019.23 Rp 3,703,309.04
Rp 5,147,898.63 Rp 1,029,579.73
Rp 1,270,466.92 Rp 13,859.64
Rp 7,287,644.26 Rp (520,546.02)
Rp 200,615,428.99 Rp (19,503,105.19)
Rp 11,310,836.21 Rp (2,786.61)
JUMLAH HARGA
CCO SELISIH
9 10 = 9 - 8
Rp 283,786,451.54 Rp -
Rp 8,731,890.82 Rp -
Rp 16,255,507.17 Rp -
Rp 14,805,329.18 Rp -
Rp 6,418,153.55 Rp -
Rp 382,020,223.22 Rp -
Rp 11,754,468.41 Rp -
Rp 21,882,413.50 Rp -
Rp 19,930,250.82 Rp -
Rp 8,639,822.09 Rp -
Rp 28,221,929.40 Rp (10,131,560.72)
Rp 18,412,695.78 Rp (1,416,361.21)
Rp 20,560,107.39 Rp (1,468,579.10)
Rp 111,070,113.37 Rp (6,973,011.60)
Rp 87,520,475.10 Rp (9,568,154.83)
Rp 78,992,911.30 Rp (3,726,938.28)
Rp 64,768,122.00 Rp (35,298,626.49)
Rp 8,430,009.84 Rp (936,667.76)
Rp 18,660,028.22 Rp 623,754.47
JUMLAH HARGA
CCO SELISIH
9 10 = 9 - 8
Rp 17,811,544.04 Rp (693,956.26)
Rp 22,814,150.06 Rp (2,701,675.67)
Rp 4,306,223.63 Rp (440,840.52)
Rp 3,788,856.55 Rp (488,884.72)
Rp 84,668,085.31 Rp (6,168,771.63)
Rp 73,636,192.22 Rp (5,895,890.78)
Rp 11,236,741.99 Rp 6,961,894.49
Rp 3,052,813.00 Rp (4,149,578.01)
Rp 35,264,279.02 Rp (5,135,145.62)
Rp 2,745,898.39 Rp (98,894.42)
Rp 757,251,427.65 Rp (58,788,739.45)
Rp 14,708,531.53 Rp 2,941,706.31
Rp 5,397,264.19 Rp (1,359.85)
###
###
Rp 30,884,221.59 Rp (265,074.21)
Rp 11,514,975.31 Rp (216,040.81)
Rp 16,306,079.40 Rp (33,640.60)
Rp 3,063,166.88 Rp (15,392.80)
###
Rp 27,144,275.00 Rp (891,000.00)
Rp 5,000,000.00 Rp -
Rp 192,000.00 Rp -
Rp 5,002,080.00 Rp -
Rp 7,798,455.00 Rp -
Rp 1,408,700.00 Rp -
Rp 2,073,040.00 Rp -
Rp 5,670,000.00 Rp (891,000.00)
###
JUMLAH HARGA
CCO SELISIH
9 10 = 9 - 8
Rp 376,257,430.36 Rp 86,731,843.14
Rp 5,997,029.08 Rp -
Rp 370,260,401.28 Rp 86,731,843.14
###
Rp 5,558,204,889.73 Rp (18,954,789.14)
Rp 581,394,558.67 Rp 19,484,448.61
Rp 24,098,521.56 Rp (6,027,806.56)
Rp 108,256,029.64 Rp (10,601,928.58)
Rp 14,984,655.72 Rp (3,748,138.90)
Rp 133,162,416.14 Rp (13,041,106.63)
Rp 27,205,372.86 Rp -
Rp 87,571,204.61 Rp 622,639.28
Rp 10,682,910.00 Rp (90.00)
Rp 88,620,480.00 Rp 52,280,880.00
Rp 69,204,806.13 Rp -
Rp 17,608,162.00 Rp -
###
Rp 966,638,732.35 Rp (25,045,138.52)
Rp 102,754,443.22 Rp (668,926.51)
Rp 497,840,295.84 Rp (10,659,995.40)
Rp 39,977,704.91 Rp -
Rp 23,891,852.16 Rp 1,942,441.13
Rp 8,708,495.63 Rp -
Rp 3,552,375.25 Rp -
Rp 38,281,144.82 Rp 1,494,595.02
Rp 134,770,520.00 Rp (10,596,280.00)
Rp 83,395,930.39 Rp (6,556,972.77)
Rp 33,465,970.13 Rp -
###
JUMLAH HARGA
CCO SELISIH
9 10 = 9 - 8
Rp 202,783,526.69 Rp 8,185,557.79
Rp 107,552,538.14 Rp 2,835,982.16
Rp 10,040,971.20 Rp 772,382.40
Rp 71,426,786.55 Rp 4,062,168.23
Rp 2,082,340.80 Rp -
Rp 4,456,260.00 Rp -
Rp 3,205,680.00 Rp -
Rp 4,018,950.00 Rp 515,025.00
###
Rp 627,573,703.75 Rp 46,874,328.75
Rp 618,223,703.75 Rp 46,874,328.75
Rp 1,400,000.00 Rp -
Rp 900,000.00 Rp -
Rp 7,050,000.00 Rp -
JUMLAH HARGA
CCO SELISIH
9 10 = 9 - 8
###
Rp 2,567,641,572.94 Rp (63,554,368.39)
Rp 301,877,882.84 Rp (2,721.46)
Rp 18,577,840.94 Rp 12,385,227.29
Rp 8,799,484.68 Rp (4,571.16)
Rp 10,738,064.60 Rp (4,571.33)
Rp 81,168,944.70 Rp 23,330.66
Rp 50,751,698.54 Rp 19,288,701.80
Rp 93,535,537.45 Rp (2,696,855.94)
Rp 20,560,107.39 Rp (1,468,579.10)
Rp 27,581,072.35 Rp (2,143,381.17)
Rp 115,054,691.42 Rp (4,482,650.32)
Rp 97,707,745.84 Rp (11,857,007.56)
Rp 59,085,606.84 Rp (12,592,809.33)
Rp 24,069,156.99 Rp (2,351,565.02)
Rp 30,764,857.95 Rp (3,238,406.10)
Rp 20,887,691.04 Rp (1,361,290.48)
Rp 8,612,320.72 Rp (2,137,298.44)
Rp 44,945,056.13 Rp (5,196,487.22)
Rp 49,563,898.30 Rp (943,780.52)
Rp 73,470,568.78 Rp (2,704,677.53)
Rp 3,941,289.42 Rp (437,921.05)
Rp 146,904,890.06 Rp (4,467,275.28)
Rp 54,048,951.95 Rp (834,758.23)
Rp 19,827,207.08 Rp (6,136,992.67)
Rp 48,080,881.86 Rp 535,257.42
Rp 24,747,803.80 Rp (3,658,041.65)
Rp 17,359,127.78 Rp (4,208.27)
Rp 8,332,381.33 Rp (193,580.58)
JUMLAH HARGA
CCO SELISIH
9 10 = 9 - 8
Rp 972,970,628.29 Rp (75,846,110.87)
Rp 45,035,400.65 Rp 9,007,080.13
Rp 32,554,926.83 Rp 26,007,225.38
Rp 56,085,856.40 Rp 13,964,350.19
###
Rp 214,113,768.08 Rp 3,761,460.24
Rp 101,057,950.97 Rp 685,389.48
Rp 22,048,416.00 Rp -
Rp 3,460,176.00 Rp 2,306,784.00
Rp 6,157,119.36 Rp 769,639.92
Rp 50,635,830.38 Rp -
Rp 3,448,631.81 Rp (353.16)
Rp 5,643,143.57 Rp -
Rp 21,662,500.00 Rp -
###
Rp 112,816,748.50 Rp (2,609,935.00)
Rp 13,000,000.00 Rp -
Rp 7,503,120.00 Rp 2,501,040.00
Rp 13,740,135.00 Rp 3,713,550.00
Rp 25,179,750.00 Rp -
Rp 4,793,905.00 Rp 129,565.00
Rp 6,702,755.00 Rp (56,090.00)
Rp 3,662,620.00 Rp -
Rp 10,656,463.50 Rp -
Rp 848,000.00 Rp 12,000.00
Rp 26,730,000.00 Rp (8,910,000.00)
###
Rp 285,242,278.75 Rp (6,051,142.61)
Rp 20,338,987.80 Rp 110,545.47
JUMLAH HARGA
CCO SELISIH
9 10 = 9 - 8
Rp 171,065,273.29 Rp 1,216,289.76
Rp 93,838,017.67 Rp (7,377,977.84)
###
Rp 4,724,865,362.33 Rp (85,974,680.18)
Rp 488,472,055.78 Rp 13,484,830.14
Rp 22,912,120.00 Rp (2,186,395.63)
Rp 143,513,073.60 Rp 4,446,112.85
Rp 14,246,941.63 Rp (1,359,518.49)
Rp 176,531,022.72 Rp 5,469,026.82
Rp 27,205,372.86 Rp -
Rp 104,063,524.97 Rp 7,115,604.59
###
Rp 954,013,959.51 Rp (9,480,314.65)
Rp 554,232,651.48 Rp -
JUMLAH HARGA
CCO SELISIH
9 10 = 9 - 8
Rp 39,977,704.91 Rp -
Rp 41,083,615.95 Rp -
Rp 8,708,495.63 Rp -
Rp 2,097,047.33 Rp (51,566.74)
Rp 32,257,001.56 Rp 524,516.36
Rp 138,065,453.33 Rp (6,148,546.67)
Rp 85,434,833.49 Rp (3,804,717.60)
Rp 52,157,155.84 Rp -
###
Rp 2,586,969,381.31 Rp (71,275,346.64)
Rp 288,990,589.71 Rp (2,605.28)
Rp 4,971,137.45 Rp (2,285.58)
Rp 10,738,064.60 Rp (4,571.33)
Rp 67,450,033.81 Rp (19,047.11)
Rp 93,535,537.45 Rp (5,382.95)
Rp 3,520,669.30 Rp (4,496.38)
Rp 26,923,950.16 Rp 4,895,263.67
Rp 6,994,354.78 Rp 2,915,868.79
Rp 135,176,810.62 Rp (8,865,686.18)
Rp 20,637,196.70 Rp (1,876,108.79)
Rp 94,991,475.61 Rp (24,997,756.74)
Rp 8,306,511.65 Rp (845,223.99)
Rp 4,293,060.56 Rp (390,278.23)
Rp 95,457,539.05 Rp (10,949,087.68)
Rp 150,393,278.69 Rp (1,951,210.20)
Rp 3,941,289.42 Rp (437,921.05)
Rp 80,851,581.55 Rp 2,555,633.96
Rp 112,639,777.39 Rp (3,700,542.37)
Rp 31,959,569.51 Rp (495,680.18)
JUMLAH HARGA
CCO SELISIH
9 10 = 9 - 8
Rp 65,190,662.08 Rp 8,301,616.97
Rp 52,843,125.72 Rp 52,843,125.72
Rp 9,373,719.88 Rp (38,441,216.81)
Rp 5,646,450.83 Rp 1,589,675.28
Rp 8,332,381.33 Rp (193,580.58)
Rp 44,349,903.49 Rp 44,349,903.49
Rp 907,730,397.27 Rp (92,788,288.24)
Rp 150,609,055.63 Rp (25,726,895.16)
Rp 45,035,400.65 Rp 9,007,080.13
Rp 56,085,856.40 Rp 13,964,350.19
###
Rp 227,445,383.16 Rp 1,315,339.85
Rp 103,970,958.86 Rp (1,672,998.45)
Rp 28,832,544.00 Rp -
Rp 3,460,176.00 Rp -
Rp 3,078,559.68 Rp -
Rp 58,283,433.00 Rp (1,236,690.00)
Rp 10,366,586.62 Rp 6,496,903.30
Rp 19,453,125.00 Rp (2,271,875.00)
###
Rp 146,849,801.50 Rp (29,638,000.00)
Rp 17,000,000.00 Rp -
Rp 7,503,120.00 Rp -
Rp 15,225,555.00 Rp -
Rp 29,302,750.00 Rp -
Rp 5,700,860.00 Rp -
Rp 7,824,555.00 Rp -
Rp 4,789,580.00 Rp -
Rp 12,401,381.50 Rp -
JUMLAH HARGA
CCO SELISIH
9 10 = 9 - 8
Rp 932,000.00 Rp 8,000.00
Rp 46,170,000.00 Rp (29,646,000.00)
###
Rp 321,114,781.08 Rp 9,618,811.12
Rp 21,700,501.90 Rp -
Rp 203,282,065.33 Rp 13,899,921.19
Rp 96,132,213.85 Rp (4,281,110.07)
###
Rp 3,528,662,417.25 Rp (136,116,876.57)
Rp 562,645,180.27 Rp 5,356,115.03
Rp 25,098,515.63 Rp -
Rp 170,704,681.60 Rp -
Rp 15,606,460.13 Rp -
Rp 209,978,584.32 Rp -
JUMLAH HARGA
CCO SELISIH
9 10 = 9 - 8
Rp 23,095,341.00 Rp -
Rp 118,161,597.60 Rp 5,356,115.03
###
Rp 884,926,643.87 Rp (71,066,447.10)
Rp 554,232,651.48 Rp -
Rp 39,977,704.91 Rp -
Rp 32,196,046.00 Rp -
Rp 8,708,495.63 Rp -
Rp 3,867,505.31 Rp (115,280.31)
Rp 32,257,001.56 Rp 524,516.36
Rp 104,860,488.00 Rp (44,153,512.00)
Rp 64,887,617.54 Rp (27,322,171.15)
Rp 43,939,133.44 Rp -
###
Rp 1,415,343,782.79 Rp (70,011,101.82)
Rp 236,946,582.26 Rp -
Rp 27,484,104.76 Rp 2,287,866.02
Rp 15,675,105.79 Rp 4,932,469.86
Rp 169,083,471.55 Rp (2,202.11)
Rp 5,139,367.83 Rp 1,614,202.14
Rp 5,722,131.81 Rp (375,221.76)
Rp 27,724,784.75 Rp (1,818,018.67)
Rp 7,934,094.95 Rp (971,521.83)
Rp 5,105,320.78 Rp (364,665.77)
Rp 43,871,704.23 Rp 7,311,950.70
Rp 4,703,481.33 Rp 459,553.26
Rp 90,806,320.96 Rp (3,001,861.85)
Rp 64,812,314.92 Rp 2,043,631.55
Rp 4,135,110.66 Rp (271,154.80)
JUMLAH HARGA
CCO SELISIH
9 10 = 9 - 8
Rp 16,156,186.78 Rp (1,261,996.69)
Rp 14,936,791.05 Rp (995,786.07)
Rp 100,322,127.25 Rp (1,469,337.67)
Rp 5,476,469.39 Rp (29,351,954.38)
Rp 8,034,619.90 Rp (8,207,674.16)
Rp 6,265,067.02 Rp (47,343.08)
Rp 104,533,802.16 Rp (26,020,536.21)
Rp 385,773,923.59 Rp (15,504,873.62)
Rp 15,011,800.22 Rp 3,002,360.04
Rp 49,689,098.85 Rp (1,998,986.74)
###
Rp 203,482,785.77 Rp 14,958,792.08
Rp 105,836,384.86 Rp 12,355,525.30
Rp 32,224,608.00 Rp -
Rp 4,594,344.80 Rp 2,287,560.80
Rp 6,157,119.36 Rp -
Rp 31,305,659.00 Rp 158,737.99
Rp 13,914,669.75 Rp 3,119,467.99
Rp 9,450,000.00 Rp (2,962,500.00)
###
Rp 122,982,709.00 Rp 5,457,029.00
Rp 19,000,000.00 Rp (2,000,000.00)
Rp 9,691,530.00 Rp 625,260.00
Rp 18,567,750.00 Rp 742,710.00
Rp 16,786,500.00 Rp 294,500.00
Rp 6,478,250.00 Rp (1,036,520.00)
Rp 3,309,310.00 Rp 2,187,510.00
Rp 5,353,060.00 Rp -
Rp 7,104,309.00 Rp 4,611,569.00
JUMLAH HARGA
CCO SELISIH
9 10 = 9 - 8
Rp 1,052,000.00 Rp 32,000.00
Rp 35,640,000.00 Rp -
###
Rp 339,281,315.55 Rp (20,811,263.76)
Rp 21,942,732.72 Rp 370,482.19
Rp 241,081,152.29 Rp 10,927,902.20
Rp 76,257,430.54 Rp (32,109,648.15)
###
Rp 2,643,642,737.19 Rp 55,800,262.09
Rp 169,354,003.65 Rp 8,098,506.93
Rp 53,868,285.10 Rp (132,294.50)
Rp 66,261,722.52 Rp (162,731.40)
JUMLAH HARGA
CCO SELISIH
9 10 = 9 - 8
Rp 7,260,324.00 Rp -
Rp 41,963,672.03 Rp 8,393,532.83
###
Rp 90,397,965.59 Rp 516,625.84
Rp 75,158,956.32 Rp (1,823,850.08)
Rp 9,671,849.76 Rp (181.48)
Rp 5,567,159.51 Rp 2,340,657.40
###
Rp 71,375,241.51 Rp (147,864,259.26)
Rp 61,867,039.44 Rp -
Rp 4,571,160.88 Rp 2,285,580.44
Rp 4,937,041.20 Rp -
Rp - Rp (1,618,698.53)
Rp - Rp (148,531,141.16)
###
Rp 9,900,122.25 Rp (1,064,481.05)
Rp 4,626,773.25 Rp 3,352,132.45
Rp 2,306,784.00 Rp (1,153,392.00)
Rp 2,966,565.00 Rp (3,263,221.50)
###
Rp 39,197,322.50 Rp 1,692,332.00
Rp 1,250,520.00 Rp 312,630.00
Rp 1,856,775.00 Rp 742,710.00
Rp 736,250.00 Rp 294,500.00
Rp 518,260.00 Rp 129,565.00
Rp 140,225.00 Rp 56,090.00
Rp 311,592.50 Rp 124,637.00
Rp 64,000.00 Rp 16,000.00
Rp 34,319,700.00 Rp 16,200.00
JUMLAH HARGA
CCO SELISIH
9 10 = 9 - 8
###
Rp 2,180,903,208.54 Rp 178,379,629.85
Rp 56,981,365.39 Rp (8,419,033.97)
Rp 547,893,271.52 Rp 54,010,410.72
Rp 52,804,670.07 Rp 6,754,001.27
Rp 40,943,242.99 Rp 5,243,412.59
Rp 471,885,105.88 Rp 439,430.06
Rp 20,274,630.78 Rp 11,039,676.13
Rp 12,552,313.86 Rp (298,859.33)
Rp 34,886,134.52 Rp 6.76
Rp 1,499,304.16 Rp (9.51)
Rp 17,117,000.78 Rp 395,258.41
Rp 6,079,779.31 Rp -
Rp 6,300,000.00 Rp (150,000.00)
Rp 11,622,000.00 Rp 253,500.00
Rp 11,038,239.25 Rp (202,353.65)
Rp 15,874,775.39 Rp 899,791.57
Rp 314,121,762.00 Rp 40,509,762.00
Rp 526,067,960.52 Rp 67,842,761.80
Rp 16,276,027.13 Rp -
Rp 16,685,625.00 Rp 61,875.00
###
Rp 82,514,873.16 Rp 16,041,907.77
Rp 541,271.73 Rp (354,372.18)
Rp 81,973,601.42 Rp 16,396,279.95
###
Rp 190,967,457.31 Rp (5,198,993.32)
Rp 3,060,338.70 Rp (78.90)
Rp 781,056.00 Rp -
JUMLAH HARGA
CCO SELISIH
9 10 = 9 - 8
Rp 1,121,274.00 Rp -
Rp 584,958.00 Rp -
Rp 126,240.00 Rp -
Rp 446,810.70 Rp (78.90)
###
JUMLAH HARGA
CCO SELISIH
9 10 = 9 - 8
Rp 43,213,583.33 Rp (50.88)
Rp 1,776,573.71 Rp -
Rp 5,499,048.06 Rp -
Rp 9,752,394.36 Rp (50.88)
Rp 11,996,120.69 Rp -
Rp 5,993,522.64 Rp -
Rp 8,195,923.88 Rp -
###
Rp 95,120,484.47 Rp (7,476,463.54)
Rp 631,035.20 Rp -
Rp 10,982,183.74 Rp 2,707,794.68
Rp 8,453,867.79 Rp (696.65)
Rp 12,814,696.69 Rp -
Rp 8,338,114.02 Rp -
Rp 6,609,685.66 Rp -
Rp 4,703,654.90 Rp 5,811.13
Rp 4,294,122.82 Rp -
Rp 12,766,849.43 Rp (6,751,122.60)
Rp 25,526,274.22 Rp (3,438,250.10)
###
Rp 33,562,788.49 Rp 2,277,600.00
Rp 5,081,373.36 Rp -
Rp 1,464,315.13 Rp -
Rp 1,400,000.00 Rp -
Rp 7,050,000.00 Rp -
Rp 800,000.00 Rp -
Rp 17,767,100.00 Rp 2,277,600.00
###
Rp 16,010,262.32 Rp -
JUMLAH HARGA
CCO SELISIH
9 10 = 9 - 8
Rp 16,010,262.32 Rp -
###
Rp 482,002,360.23 Rp (1,344,143.05)
Rp 6,749,416.62 Rp (203,989.50)
Rp 1,265,310.72 Rp -
Rp 2,968,812.00 Rp -
Rp 1,127,758.50 Rp (203,989.50)
Rp 204,508.80 Rp -
Rp 1,183,026.60 Rp -
###
Rp 122,497,070.99 Rp -
Rp 4,703,857.70 Rp -
Rp 14,559,902.28 Rp -
Rp 31,808,686.05 Rp -
Rp 39,126,887.46 Rp -
Rp 9,942,262.65 Rp -
Rp 22,355,474.85 Rp -
###
Rp 12,826,040.02 Rp -
Rp 2,637,913.24 Rp -
Rp 1,031,334.75 Rp -
Rp 4,827,763.20 Rp -
Rp 1,296,000.00 Rp -
Rp 801,964.15 Rp -
Rp 2,231,064.68 Rp -
###
Rp 207,817,273.44 Rp (1,140,153.55)
Rp 1,022,277.02 Rp -
Rp 12,251,998.74 Rp 332,897.44
JUMLAH HARGA
CCO SELISIH
9 10 = 9 - 8
Rp 25,957,240.53 Rp (2,786.61)
Rp 42,787,690.36 Rp -
Rp 53,484,612.95 Rp -
Rp 23,142,380.60 Rp 2,285.67
Rp 12,747,250.92 Rp (4,496.38)
Rp 9,769,129.41 Rp (1,498,355.25)
Rp 8,427,067.48 Rp 2,104.14
Rp 3,496,391.87 Rp (4,269.10)
Rp 10,265,639.98 Rp -
Rp 4,465,593.58 Rp 32,466.54
###
Rp 88,442,434.59 Rp -
Rp 50,700,000.00 Rp -
Rp 9,750,000.00 Rp -
Rp 15,076,581.63 Rp -
Rp 1,930,956.00 Rp -
Rp 2,308,919.76 Rp -
JUMLAH HARGA
CCO SELISIH
9 10 = 9 - 8
Rp 5,406,676.80 Rp -
Rp 1,041,170.40 Rp -
Rp 2,228,130.00 Rp -
###
Rp 43,670,124.58 Rp -
Rp 43,670,124.58 Rp -
###
Rp 523,774,870.67 Rp (912,776,653.82)
Rp 20,188,242.90 Rp (593,554.50)
Rp 11,999,988.00 Rp -
Rp 3,406,441.50 Rp (593,554.50)
Rp 4,781,813.40 Rp -
###
Rp 96,856,689.64 Rp (140,246,429.75)
Rp 6,337,690.63 Rp (12,675,381.26)
Rp 37,439,439.75 Rp (21,411,929.97)
Rp 14,684,689.50 Rp (29,369,379.00)
Rp 18,063,185.40 Rp (36,126,370.80)
Rp 8,314,322.76 Rp (16,628,645.52)
Rp 12,017,361.60 Rp (24,034,723.20)
###
Rp 115,623,718.67 Rp (231,248,830.65)
Rp 30,158,049.98 Rp (60,317,493.27)
Rp 85,465,668.69 Rp (170,931,337.38)
###
Rp 267,631,000.00 Rp (493,737,400.00)
Rp 267,631,000.00 Rp (493,737,400.00)
###
Rp 23,475,219.46 Rp (46,950,438.91)
JUMLAH HARGA
CCO SELISIH
9 10 = 9 - 8
Rp 23,475,219.46 Rp (46,950,438.91)
###
Rp 294,438,786.15 Rp (531,099,651.18)
Rp 5,462,826.60 Rp (10,429,638.60)
Rp 3,232,152.00 Rp (5,944,554.00)
Rp 942,711.00 Rp (2,116,191.00)
Rp 1,287,963.60 Rp (2,368,893.60)
###
Rp 132,787,864.16 Rp (216,888,891.96)
Rp 5,121,099.98 Rp (9,418,695.47)
Rp 28,820,721.60 Rp (16,184,466.54)
Rp 32,037,657.30 Rp (58,923,461.48)
Rp 39,408,537.96 Rp (72,479,939.67)
Rp 6,489,227.52 Rp (18,453,740.76)
Rp 20,910,619.80 Rp (41,428,588.05)
###
Rp 115,340,411.42 Rp (222,852,774.73)
Rp 24,368,874.76 Rp (44,816,994.03)
Rp 66,704,912.15 Rp (133,409,824.30)
Rp 24,266,624.51 Rp (44,625,956.40)
###
Rp 40,847,683.97 Rp (80,928,345.89)
Rp 40,847,683.97 Rp (80,928,345.89)
###
Rp 870,405,626.83 Rp (15,787,800.00)
Rp 555,789,978.03 Rp (15,787,800.00)
Rp 74,425,807.20 Rp -
Rp 88,029,926.40 Rp -
Rp 343,614,394.43 Rp -
Rp 32,627,650.00 Rp -
JUMLAH HARGA
CCO SELISIH
9 10 = 9 - 8
Rp 17,092,200.00 Rp (15,787,800.00)
###
Rp 314,615,648.80 Rp -
Rp 6,320,160.00 Rp -
Rp 702,240.00 Rp -
Rp 1,744,960.00 Rp -
Rp 4,797,120.00 Rp -
Rp 11,989,668.80 Rp -
Rp 5,856,500.00 Rp -
Rp 48,285,000.00 Rp -
Rp 229,770,000.00 Rp -
Rp 2,550,000.00 Rp -
Rp 2,600,000.00 Rp -
RENCANA ANGGARAN BIAYA M & E ( RAB )
ADENDUM I
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR DPRD LOMB
LOKASI : SELONG - LOMBOK TIMUR
TAHUN ANGGARAN : 2016
VOLUME
NO. URAIAN PEKERJAAN
TAMBAH/
CCO MC100
KURANG
1 2 3 4 5=3+4
A PENGADAAN DAYA BARU
1 Pengadaan Daya baru untuk gedung DPRD Kab. LOTIM - NTB 197,000.00 (13,200.00) 183,800.00
di Selong - LOTIM . Nyala, lengkap dengan Panel KWH
197 KVA Lengkap terpasang dan menyala. ( Include dgn
Tiang Listrik dll )
- (Tambah Daya dari 13.200 ke 197.000)
Panel Lantai 1
22 Pengadaan Kabel Power dari Panel lantai 1 ke Panel 10.00 (5.00) 5.00
Penerangan, Daya dan AC Lt. 1 NYFGBY 4 X 16 mm2
23 Pengadaan Kabel Power dari Panel lantai 1 ke Panel 10.00 (5.00) 10.00
AC Lt. 1 NYFGBY 4 X 25 mm2
Panel Lantai 2
24 Pengadaan Kabel Power dari Panel lantai 2 ke Panel 10.00 (5.00) 5.00
Penerangan dan Daya Lt. 2 NYFGBY 4 X 16 mm2
25 Pengadaan Kabel Power dari Panel lantai 2 ke Panel 10.00 (5.00) 5.00
AC Lt. 2 NYFGBY 4 X 35 mm2
Panel Lantai 3
26 Pengadaan Kabel Power dari Panel lantai 3 ke Panel 10.00 (5.00) 5.00
Penerangan dan Daya Lt. 3 NYFGBY 4 X 16 mm2
27 Pengadaan Kabel Power dari Panel lantai 3 ke Panel 10.00 (5.00) 5.00
AC Lt. 3 NYFGBY 4 X 25 mm2
Panel Lantai 4
28 Pengadaan Kabel Power dari Panel lantai 4 ke Panel 10.00 (5.00) 5.00
Penerangan dan Daya Lt. 4 NYY 3 X 4 mm2 -
29 Pengadaan Kabel Power dari Panel lantai 4 ke Panel 10.00 (5.00) 5.00
AC Lt. 4 NYY 4 X 25 mm2 -
30 Pengadaan Kabel Power dari Panel lantai 4 ke Panel 10.00 10.00 20.00
Ruang Sound System Lt. 4 NYY 4 X 10 mm2
48 Pengadaan Kabel Tray lengkap dengan clem, gantungan 210.00 55.00 265.00
dan pemasangan ( Electro Galvanis )
F Air Conditioning ( AC )
Pengadaan dan Pemasangan AC lengkap pemipaan Refrigerant
dan pemipaan drain, refrigeran, hanger / dudukan
sesuai kapasitas ( 10A - 10 KA , 16 A - 10 KA )
kabel power NYM atau NYY dan kabel kontrol
( Sekelas Panasonic atau DAIKIN )
Lantai Basement
50 Kapasitas : 9.000 BTU /Hr, Dinding ( 1 pk ) Split 5.00 - 5.00
Lengkap Pipa Refrigerant, Pipa/ Selang Drain,
Lantai 1
51 Kapasitas : 9.000 BTU /Hr, Dinding ( 1 pk ) Split 23.00 (5.00) 18.00
Lengkap Pipa Refrigerant, Pipa/ Selang Drain,
52 Kapasitas : 27.000 BTU /Hr, Celling / Casset ( 3 pk ) 5.00 - 5.00
Lengkap Pipa Refrigerant, Pipa/ Selang Drain, Terpasang
Lantai 2
53 Kapasitas : 9.000 BTU /Hr, Dinding ( 1 pk ) Split 37.00 (1.00) 36.00
Lengkap Pipa Refrigerant, Pipa/ Selang Drain,
Lantai 3
54 Kapasitas : 9.000 BTU /Hr, Dinding ( 1 pk ) Split 13.00 - 13.00
Lengkap Pipa Refrigerant, Pipa/ Selang Drain,
55 Kapasitas : 18.000 BTU /Hr, Dinding ( 2 pk ) Split 3.00 - 3.00
Lengkap Pipa Refrigerant, Pipa/ Selang Drain,
56 Kapasitas : 27.000 BTU /Hr, Celling / Casset ( 3 pk ) 2.00 - 2.00
Lengkap Pipa Refrigerant, Pipa/ Selang Drain, Terpasang
Lantai 4
57 Kapasitas : 9.000 BTU /Hr, Dinding ( 1 pk ) Split 1.00 - 1.00
Lengkap Pipa Refrigerant, Pipa/ Selang Drain,
58 Kapasitas : 36.000 BTU /Hr, Celling / Casset ( 4 pk ) 6.00 - 6.00
Lengkap Pipa Refrigerant, Pipa/ Selang Drain, Terpasang
58a Pemindahan Outdoor AC - 73.00 73.00
I Lampu Penerangan
Pengadaan Pemasangan Lampu setara Philips,Visilite dan
Interlite, lengkap dgn gantungan ,dan stop kontak dalam pipa
conduit hanger termasuk bobokan, terpasang nyala dan perapian
kembali
Lantai Basement
69 Pengadaan Pemasangan Lampu dengan lampu TL -
Prismatic RMI 2 X 18 watt
70 Pengadaan Pemasangan Lampu dengan lampu TL -
Prismatic RMI 2 X 18 watt lengkap dengan battery
71 Pengadaan Pemasangan Lampu dengan Lampu Down Light 5.00 - 5.00
FBH/FBS 145 Tornado PLC 15 watt
72 Pengadaan Pemasangan Lampu dengan Lampu Down Light -
FBH/FBS 145 Tornado PLC 15 watt Lengkap dgn battery
73 Pengadaan Pemasangan Lampu dengan Lampu TL V shape 56.00 - 56.00
2 X 18 watt
74 Pengadaan Pemasangan Lampu dengan lampu Down Light 4.00 - 4.00
Recessed 1 X 10 watt ( Toilet )
75 Pengadaan Pemasangan Lampu dengan lampu Dinding 1.00 - 1.00
8 watt
76 Pengadaan Pemasangan Stop Kontak 200 watt
kap kontak 16 Am , untuk wall
- Elv. 40 16.00 - 16.00
- 1,5 mt 5.00 - 5.00
- 250 cm TV 1.00 1.00 2.00
77 Pengadaan Pemasangan saklar kap 16 Am -
- Tunggal 7.00 - 7.00
- Ganda 16.00 - 16.00
- Hotel -
78 Pemasangan titik instalasi lampu dan stop kontak 88.00 - 88.00
dalam pipa conduit
Lantai 1
79 Pengadaan Pemasangan Lampu dengan lampu Hias 1.00 - 1.00
Gantung 16 X 5 watt -
80 Pengadaan Pemasangan Lampu dengan lampu TL 57.00 - 57.00
Prismatic RMI 2 X 18 watt -
81 Pengadaan Pemasangan Lampu dengan lampu TL 5.00 - 5.00
Prismatic RMI 2 X 18 watt lengkap dengan battery -
82 Pengadaan Pemasangan Lampu dengan Lampu Down Light 90.00 - 90.00
FBH/FBS 145 Tornado PLC 15 watt -
83 Pengadaan Pemasangan Lampu dengan Lampu Down Light 3.00 - 3.00
FBH/FBS 145 Tornado PLC 15 watt Lengkap dgn battery -
84 Pengadaan Pemasangan Lampu dengan Lampu TL V shape -
VOLUME
NO. URAIAN PEKERJAAN
TAMBAH/
CCO MC100
KURANG
1 2 3 4 5=3+4
2 X 18 watt -
85 Pengadaan Pemasangan Lampu dengan lampu Down Light 4.00 4.00 8.00
Recessed 1 X 10 watt ( Toilet ) -
86 Pengadaan Pemasangan Lampu dengan lampu Dinding 3.00 (1.00) 2.00
8 watt -
87 Pengadaan Pemasangan Stop Kontak 200 watt -
kap kontak 16 Am , untuk wall -
- Elv. 0 ( stop kontak lantai bahan plate ) 3.00 - 3.00
- Elv. 40 70.00 - 70.00
- 1,5 mt 4.00 - 4.00
- 250 cm TV 2.00 - 2.00
88 Pengadaan Pemasangan saklar kap 16 Am -
- Tunggal 13.00 1.00 14.00
- Ganda 36.00 - 36.00
- Hotel 2.00 (2.00) -
89 Pemasangan titik instalasi lampu dan stop kontak 243.00 1.00 244.00
dalam pipa conduit
Lantai 2
90 Pengadaan Pemasangan Lampu dengan lampu TL 72.00 - 72.00
Prismatic RMI 2 X 18 watt -
91 Pengadaan Pemasangan Lampu dengan lampu TL 4.00 - 4.00
Prismatic RMI 2 X 18 watt lengkap dengan battery -
92 Pengadaan Pemasangan Lampu dengan Lampu Down Light 84.00 - 84.00
FBH/FBS 145 Tornado PLC 15 watt -
93 Pengadaan Pemasangan Lampu dengan Lampu Down Light 6.00 - 6.00
FBH/FBS 145 Tornado PLC 15 watt Lengkap dgn battery -
94 Pengadaan Pemasangan Lampu dengan Lampu TL V shape -
2 X 18 watt -
95 Pengadaan Pemasangan Lampu dengan lampu Down Light 4.00 - 4.00
Recessed 1 X 10 watt ( Toilet ) -
96 Pengadaan Pemasangan Lampu dengan lampu Dinding 3.00 - 3.00
8 watt -
97 Pengadaan Pemasangan Stop Kontak 200 watt -
kap kontak 16 Am , untuk wall -
- Elv. 40 64.00 - 64.00
- 1,5 mt 3.00 - 3.00
- 250 cm TV 2.00 1.00 3.00
98 Pengadaan Pemasangan saklar kap 16 Am -
- Tunggal 5.00 - 5.00
- Ganda 32.00 - 32.00
- Hotel 2.00 (2.00) -
99 Pemasangan titik instalasi lampu dan stop kontak 242.00 - 242.00
dalam pipa conduit
Lantai 3
100 Pengadaan Pemasangan Lampu dengan lampu TL 50.00 - 50.00
Prismatic RMI 2 X 18 watt -
101 Pengadaan Pemasangan Lampu dengan lampu TL 3.00 - 3.00
Prismatic RMI 2 X 18 watt lengkap dengan battery -
102 Pengadaan Pemasangan Lampu dengan Lampu Down Light 83.00 - 83.00
FBH/FBS 145 Tornado PLC 15 watt -
103 Pengadaan Pemasangan Lampu dengan Lampu Down Light 8.00 - 8.00
FBH/FBS 145 Tornado PLC 15 watt Lengkap dgn battery -
104 Pengadaan Pemasangan Lampu dengan Lampu TL V shape - -
VOLUME
NO. URAIAN PEKERJAAN
TAMBAH/
CCO MC100
KURANG
1 2 3 4 5=3+4
2 X 18 watt -
105 Pengadaan Pemasangan Lampu dengan lampu Down Light 8.00 - 8.00
Recessed 1 X 10 watt ( Toilet ) -
106 Pengadaan Pemasangan Lampu dengan lampu Dinding 2.00 (1.00) 1.00
8 watt -
107 Pengadaan Pemasangan Stop Kontak 200 watt -
kap kontak 16 Am , untuk wall -
- Elv. 40 60.00 - 60.00
- 1,5 mt 3.00 - 3.00
- 250 cm TV 2.00 - 2.00
108 Pengadaan Pemasangan saklar kap 16 Am -
- Tunggal 5.00 - 5.00
- Ganda 29.00 - 29.00
- Hotel 2.00 (2.00) -
109 Pemasangan titik instalasi lampu dan stop kontak 219.00 - 219.00
dalam pipa conduit
Lantai 4
110 Pengadaan Pemasangan Lampu dengan lampu TL 1.00 - 1.00
Prismatic RMI 2 X 18 watt -
111 Pengadaan Pemasangan Lampu dengan lampu TL 1.00 - 1.00
Prismatic RMI 2 X 18 watt lengkap dengan battery -
112 Pengadaan Pemasangan Lampu dengan Lampu Down Light 58.00 - 58.00
FBH/FBS 145 Tornado PLC 15 watt -
113 Pengadaan Pemasangan Lampu dengan Lampu Down Light 10.00 - 10.00
FBH/FBS 145 Tornado PLC 15 watt Lengkap dgn battery -
114 Pengadaan Pemasangan Lampu dengan Lampu TL V shape - - -
2 X 18 watt -
115 Pengadaan Pemasangan Lampu dengan lampu Down Light - - -
Recessed 1 X 10 watt ( Toilet ) -
116 Pengadaan Pemasangan Lampu dengan lampu Dinding - - -
8 watt -
117 Pengadaan Pemasangan Stop Kontak 200 watt -
kap kontak 16 Am , untuk wall -
- Elv. 40 6.00 - 6.00
- 1,5 mt - - -
- 250 cm TV - - -
118 Pengadaan Pemasangan saklar kap 16 Am -
- Tunggal -
- Ganda 10.00 - 10.00
- Hotel - - -
119 Pemasangan titik instalasi lampu dan stop kontak 76.00 - 76.00
dalam pipa conduit
K INSTALASI TELEPON
1. Lantai - 1
171 Pengadaan dan pemasangan peralatan utama Telepon, 1.00 - 1.00
berikut dengan support material bantu lainnya sesuai
dengan spesifikasi dan gambar rencana Pengadaan dan
pemasangan 1 unit PABX
- 3 ex Lines
VOLUME
NO. URAIAN PEKERJAAN
TAMBAH/
CCO MC100
KURANG
1 2 3 4 5=3+4
- 30 extentions
1. Lantai - Basement
172 Pesawat telepon analog standart 1.00 - 1.00
173 Terminal Boks telepon Kapasitas 30 pairs 1.00 - 1.00
174 Outlet Telepon RJ 11 1.00 - 1.00
175 Instalasi Telepon ITC 2 X 2 x 0,6 mm 1.00 - 1.00
176 Instalasi Kabel Feeder Telepon ITC 20 X 2 x 0,6 mm 10.00 15.00 25.00
1. Lantai - 1 -
177 Operator Console 1.00 - 1.00
178 Pesawat telepon analog standart 8.00 - 8.00
179 MDF 150 Pairs 1.00 - 1.00
180 Terminal Boks telepon Kapasitas 30 pairs 1.00 - 1.00
181 Outlet Telepon RJ 11 8.00 - 8.00
182 Instalasi Telepon ITC 2 X 2 x 0,6 mm 8.00 - 8.00
183 Instalasi Kabel Feeder Telepon ITC 20 X 2 x 0,6 mm 80.00 (50.00) 30.00
2. Lantai - 2 -
184 Pesawat telepon analog standart 17.00 - 17.00
185 Terminal Boks telepon Kapasitas 30 pairs 1.00 - 1.00
186 Outlet Telepon RJ 11 17.00 - 17.00
187 Instalasi Telepon ITC 2 X 2 x 0,6 mm 17.00 - 17.00
188 Instalasi Kabel Feeder Telepon ITC 20 X 2 x 0,6 mm 170.00 (130.00) 40.00
3. Lantai - 3 -
189 Pesawat telepon analog standart 8.00 - 8.00
190 Terminal Boks telepon Kapasitas 30 pairs 1.00 - 1.00
191 Outlet Telepon RJ 11 8.00 - 8.00
192 Instalasi Telepon ITC 2 X 2 x 0,6 mm 8.00 - 8.00
193 Instalasi Kabel Feeder Telepon ITC 50 X 2 x 0,6 mm 80.00 (30.00) 50.00
4. Lantai - 4 -
194 Pesawat telepon analog standart 1.00 - 1.00
195 Terminal Boks telepon Kapasitas 30 pairs 1.00 - 1.00
196 Outlet Telepon RJ 11 1.00 - 1.00
197 Instalasi Telepon ITC 2 X 2 x 0,6 mm 1.00 - 1.00
198 Instalasi Kabel Feeder Telepon ITC 50 X 2 x 0,6 mm 10.00 50.00 60.00
2. Lantai - Basement
200 Horn Speaker 10/15W ZH-615SM 4.00 - 4.00
201 Ceilling Speaker 3/6 W ZS-646R 1.00 (1.00) -
202 Volume Control 6W ZV-064 1.00 - 1.00
203 Volume Control 30W ZV-303 -
204 Terminal Boks Sound System 1.00 - 1.00
205 Instalasi Horn Speaker NYMHy 2x 1,5 mm 4.00 - 4.00
VOLUME
NO. URAIAN PEKERJAAN
TAMBAH/
CCO MC100
KURANG
1 2 3 4 5=3+4
206 Instalasi Ceilling Speaker NYMHy 2x 1,5 mm 1.00 - 1.00
207 Instalasi Volume Control NYMHy 3 x 1,5 mm 1.00 - 1.00
208 Kabel Feeder NYMHy 3 x 2,5 mm 48.00 (23.00) 25.00
3. Lantai - 1
209 Horn Speaker 10/15W ZH-615SM -
210 Ceilling Speaker 3/6 W ZS-646R 9.00 - 9.00
211 Volume Control 6W ZV-064 2.00 (2.00) -
212 Volume Control 30W ZV-303 3.00 3.00
213 Terminal Boks Sound System 1.00 - 1.00
214 Instalasi Horn Speaker NYMHy 2x 1,5 mm - -
215 Instalasi Ceilling Speaker NYMHy 2x 1,5 mm 9.00 - 9.00
216 Instalasi Volume Control NYMHy 3 x 1,5 mm 5.00 - 5.00
217 Kabel Feeder NYMHy 3 x 2,5 mm 112.00 (77.00) 35.00
4. Lantai - 2
218 Ceilling Speaker 3/6 W ZS-646R 11.00 - 11.00
219 Volume Control 6W ZV-064 3.00 (3.00) -
220 Volume Control 30W ZV-303 2.00 1.00 3.00
221 Terminal Boks Sound System 1.00 - 1.00
222 Instalasi Ceilling Speaker NYMHy 2x 1,5 mm 11.00 - 11.00
223 Instalasi Volume Control NYMHy 3 x 1,5 mm 5.00 - 5.00
224 Kabel Feeder NYMHy 3 x 2,5 mm 128.00 (83.00) 45.00
5. Lantai - 3
225 Ceilling Speaker 3/6 W ZS-646R 8.00 - 8.00
226 Volume Control 6W ZV-064 3.00 (3.00) -
227 Volume Control 30W ZV-303 2.00 1.00 3.00
228 Terminal Boks Sound System 1.00 - 1.00
229 Instalasi Ceilling Speaker NYMHy 2x 1,5 mm 8.00 - 8.00
230 Instalasi Volume Control NYMHy 3 x 1,5 mm 5.00 - 5.00
231 Kabel Feeder NYMHy 3 x 2,5 mm 104.00 (49.00) 55.00
6. Lantai - 4
232 Ceilling Speaker 3/6 W ZS-646R 3.00 - 3.00
233 Volume Control 6W ZV-064 1.00 - 1.00
234 Volume Control 30W ZV-303 - -
235 Terminal Boks Sound System 1.00 - 1.00
236 Instalasi Ceilling Speaker NYMHy 2x 1,5 mm 3.00 - 3.00
237 Instalasi Volume Control NYMHy 3 x 1,5 mm 1.00 - 1.00
238 Kabel Feeder NYMHy 3 x 2,5 mm 32.00 33.00 65.00
N CCTV System
Pengadaan Pemasangan CCTV System setara SONY , INFINITY ,
COMMAX , dan EVERFOCUS, lengkap dan terpasang , berfungsi
dengan baik dan perapiannya
Lantai - Basement
241 Fix Color Dome Camera SID-50
242 Automatic Color Dome Camera SID-50
243 Standard Color Camera ( Day & Night ) SDC-415, Lens LMVZ-35 8.00 - 8.00
244 Variable Focal Lens WV-LZA61/2 8.00 - 8.00
245 Bracket SK-622 8.00 - 8.00
246 Housing SH-015 8.00 - 8.00
247 Instalasi CCTV Coaxial Cable RG-6 8.00 - 8.00
248 Instalasi Power CCTV NYMHy 2x1,5 mm 8.00 - 8.00
Lantai - 1 -
249 24 Channel DVR ( Integrated Digital Video Recording ) System S 1.00 1.00 2.00
with resolution 720 x 576, SVR - 1650 di Lobby ruang Security -
250 25" Color TV/Monitor SAM-25M 2.00 - 2.00
251 Fix Color Dome Camera SID-50 3.00 - 3.00
252 Automatic Color Dome Camera SID-50 3.00 - 3.00
253 Standard Color Camera ( Day & Night ) SDC-415, Lens LMVZ-35 8.00 - 8.00
254 Variable Focal Lens WV-LZA61/2 8.00 - 8.00
255 Bracket SK-622 8.00 - 8.00
256 Housing SH-015 8.00 - 8.00
257 Instalasi CCTV Coaxial Cable RG-6 14.00 - 14.00
258 Instalasi Power CCTV NYMHy 2x1,5 mm 14.00 - 14.00
Lantai - 2 -
259 Fix Color Dome Camera SID-50 4.00 - 4.00
260 Automatic Color Dome Camera SID-50 1.00 - 1.00
261 Standard Color Camera ( Day & Night ) SDC-415, Lens LMVZ-35 4.00 - 4.00
262 Variable Focal Lens WV-LZA61/2 2.00 - 2.00
263 Bracket SK-622 4.00 - 4.00
264 Housing SH-015 4.00 - 4.00
265 Instalasi CCTV Coaxial Cable RG-6 9.00 - 9.00
266 Instalasi Power CCTV NYMHy 2x1,5 mm 9.00 - 9.00
Lantai - 3 -
267 Fix Color Dome Camera SID-50 6.00 - 6.00
268 Automatic Color Dome Camera SID-50 -
269 Standard Color Camera ( Day & Night ) SDC-415, Lens LMVZ-35 1.00 - 1.00
270 Variable Focal Lens WV-LZA61/2 2.00 - 2.00
271 Bracket SK-622 1.00 - 1.00
272 Housing SH-015 1.00 - 1.00
273 Instalasi CCTV Coaxial Cable RG-6 7.00 - 7.00
VOLUME
NO. URAIAN PEKERJAAN
TAMBAH/
CCO MC100
KURANG
1 2 3 4 5=3+4
274 Instalasi Power CCTV NYMHy 2x1,5 mm 7.00 - 7.00
Lantai - 4 -
275 Fix Color Dome Camera SID-50 2.00 - 2.00
276 Automatic Color Dome Camera SID-50 - 1.00 1.00
277 Instalasi CCTV Coaxial Cable RG-6 2.00 1.00 3.00
278 Instalasi Power CCTV NYMHy 2x1,5 mm 2.00 1.00 3.00
Lantai 1
284 Antena UHF / VHF 25 Elements
285 Antenna Parabola 1.00 - 1.00
286 TV Modulator 1.00 - 1.00
287 TV Demodulator -
288 Setellite Receiver 1.00 - 1.00
289 Line Amplifier 1.00 - 1.00
290 Power Divider 1.00 - 1.00
291 Head End Amplifier and Active Combiner 1.00 - 1.00
292 Splitters & Tap Off 1.00 - 1.00
293 Pemutar Compact Disc 1.00 - 1.00
294 Rack Standart 1.00 - 1.00
295 Booster 1.00 - 1.00
296 Terminal Boks MATV 1.00 - 1.00
297 Outlet Televisi Coaxial Single 2.00 - 2.00
298 Instalasi Televisi Coaxial Cable RG-6 2.00 - 2.00
299 Kabel Feeder Coaxial Cable RG-11 -
Lantai 2 -
300 Terminal Boks MATV 1.00 - 1.00
301 Outlet Televisi Coaxial Single 3.00 - 3.00
302 Instalasi Televisi Coaxial Cable RG-6 3.00 - 3.00
303 Kabel Feeder Coaxial Cable RG-11 -
304 Booster 1.00 - 1.00
Lantai 3 -
305 Terminal Boks MATV 1.00 - 1.00
306 Outlet Televisi Coaxial Single 2.00 - 2.00
307 Instalasi Televisi Coaxial Cable RG-6 2.00 - 2.00
308 Kabel Feeder Coaxial Cable RG-11 - - -
309 Booster 1.00 - 1.00
P PENANGKAL PETIR
310 - Pengadaan dan pemasangan penangkal petir radius
80 - 100 mtr dengan spit dengan tiang tinggi : 2 mtr 2.00 - 2.00
( Spesifikasi sekelas : Current, Viking atau Thomas )
311 - Kabel pentanahan 1 X BC 70 mm2 lengkap terpasang 210.00 - 210.00
dengan klem, hanger, dan kelengkapannya
312 - Pentanahan dengan pipa GIP 2 " Medium didalamnya 3.00 (1.00) 2.00
dengan plat busbar L 3cm X t ,6 mm sepanjang 8 - 10
VOLUME
NO. URAIAN PEKERJAAN
TAMBAH/
CCO MC100
KURANG
1 2 3 4 5=3+4
mtr di dalam tanah
313 - Bak kontrol 40 cm X 40 cm dengan kedalaman 40 cm 3.00 (1.00) 2.00
314 - Pekerjaan sipil 1.00 - 1.00
315 - tes dan Ijin - Ijin 1.00 - 1.00
Q HYDRANT WORK
Pengadaan, Pemasangan Pompa Hydrant & termasuk
Instalasi Lengkap terpasang standard Internasional,
Capacity 400 GPM, Product, Peterson, NTT & Willo, Firebank
Amstrong, Perkins, Mitshubishi Pompa Ebara
set panel power, control, battery & charge Installed in
a set , valve, fitting & accessories pipa
316 Main pump Diesel ( Mitshubisi, Yanmar, Perkins )
Capacity : 400 USGPM 90 m3/jam ( 1.514 ltr / mnt ) 1.00 - 1.00
Total Head : 80 mt
Power : 40 Kw
R PEKERJAAN PLUMBING
AIR BERSIH
Pemipaan distribusi air bersih dari Roof Tank ke semua
outlet kran - kran, and bypasnya Pekerjaan Pemipaan
Air Bersih Bahan pipa PVC WAVIN AW lengkap terpasang
dengan gantungan, hanger, Support, Fitting dan
Asesorisnya, Pipa, PVC WAVIN AW , Valve - Valve
TOYO, KITZ , Honywell & Weflow
343 Lantai - 1
- Pipa Suplay dia 1/2 " ( PVC WAVIN AW / MASPION AW 60.00 65.00 125.00
- Pipa Suplay dia 3/4 " ( PVC WAVIN AW / MASPIOIN AW 50.00 - 50.00
- Pipa Suplay dia 1 " ( PVC WAVIN AW / MASPION AW 30.00 - 30.00
- Pipa Suplay dia 1 1/2 " ( PVC WAVIN AW / MASPION AW 30.00 - 30.00
- Pipa Suplay dia 2 " ( PVC WAVIN AW / MASPION AW 15.00 (15.00) -
- Kran bak Toilet 1/2 " 125 PSI 8.00 5.00 13.00
- Gate Valve 1 " 125 PSI 2.00 - 2.00
- Gate Valve 1 1/2 " 125 PSI 2.00 - 2.00
- Gate Valve 2 " 125 PSI 2.00 (2.00) -
- Balancing Valve 2 " 125 PSI 2.00 (2.00) -
344 Lantai - 2
- Pipa Suplay dia 1/2 " ( PVC WAVIN AW / MASPION AW 60.00 36.00 96.00
- Pipa Suplay dia 3/4 " ( PVC WAVIN AW / MASPIN AW 50.00 65.00 115.00
- Pipa Suplay dia 1 " ( PVC WAVIN AW / MASPION AW 30.00 - 30.00
- Pipa Suplay dia 1 1/2 " ( PVC WAVIN AW / MASPION AW 30.00 - 30.00
- Pipa Suplay dia 2 " ( PVC WAVIN AW / MASPION AW 15.00 (15.00) -
- Kran bak Toilet 1/2 " 125 PSI 4.00 4.00 8.00
- Gate Valve 1 " 125 PSI 2.00 - 2.00
- Gate Valve 1 1/2 " 125 PSI 2.00 - 2.00
- Gate Valve 2 " 125 PSI 2.00 (2.00) -
- Balancing Valve 2 " 125 PSI 2.00 (2.00) -
VOLUME
NO. URAIAN PEKERJAAN
TAMBAH/
CCO MC100
KURANG
1 2 3 4 5=3+4
345 Lantai - 3
- Pipa Suplay dia 1/2 " ( PVC WAVIN AW / MASPION AW 60.00 65.00 125.00
- Pipa Suplay dia 3/4 " ( PVC WAVIN AW / MASPIN AW 50.00 130.00 180.00
- Pipa Suplay dia 1 " ( PVC WAVIN AW / MASPION AW 30.00 - 30.00
- Pipa Suplay dia 1 1/2 " ( PVC WAVIN AW / MASPION AW 30.00 - 30.00
- Pipa Suplay dia 2 " ( PVC WAVIN AW / MASPION AW 15.00 (15.00) -
- Kran bak Toilet 1/2 " 125 PSI 8.00 4.00 12.00
- Gate Valve 1 " 125 PSI 2.00 - 2.00
- Gate Valve 1 1/2 " 125 PSI 2.00 - 2.00
- Gate Valve 2 " 125 PSI 2.00 (2.00) -
- Balancing Valve 2 " 125 PSI 2.00 (2.00) -
V Air Hujan
- Dia meter 3" - 35.00 35.00
- Dia meter 4" 50.00 150.00 200.00
- Dia meter 5" 40.00 30.00 70.00
- Saringan Air Hujan ( plate 4" ) 12.00 20.00 32.00
JUMLAH HARGA
SAT. HRG. SATUAN
TAMBAH/
KONTRAK ADD I
KURANG
6 7 8 9 10 = 8 + 9
bh
bh
bh 1,110,000.00
- -
bh 34,500.00 69,000.00 - 69,000.00
bh 32,000.00 32,000.00 - 32,000.00
titik 200,000.00 800,000.00 - 800,000.00
Total 1,286,000.00 215,000.00 1,501,000.00
- -
unit 650,000.00 3,250,000.00 - 3,250,000.00
unit 248,000.00 1,240,000.00 - 1,240,000.00
unit 400,000.00 2,000,000.00 - 2,000,000.00
- -
bh 25,000.00 125,000.00 - 125,000.00
unit 2,000,000.00 2,000,000.00 - 2,000,000.00
titik 208,000.00 27,664,000.00 - 27,664,000.00
- -
set 298,100.00 298,100.00 - 298,100.00
mt 54,000.00 8,640,000.00 - 8,640,000.00
- -
mt 39,000.00 5,460,000.00 - 5,460,000.00
- -
bh 1,500,000.00 15,000,000.00 - 15,000,000.00
- -
ls 1,000,000.00 1,000,000.00 - 1,000,000.00
Total 134,300,600.00 1,390,500.00 135,691,100.00
bh
bh 87,120.00 784,080.00 - 784,080.00
bh 141,240.00 282,480.00 (282,480.00) -
bh 154,440.00 463,320.00 - 463,320.00
bh 600,000.00 600,000.00 - 600,000.00
ttk - - -
ttk 250,000.00 2,250,000.00 - 2,250,000.00
bh 280,000.00 1,400,000.00 - 1,400,000.00
m' 18,000.00 2,016,000.00 (1,386,000.00) 630,000.00
unit
unit
unit
unit
unit
JUMLAH HARGA
SAT. HRG. SATUAN
TAMBAH/
KONTRAK ADD I
KURANG
6 7 8 9 10 = 8 + 9
set
set
unit
unit
lot
lot
bh
bh
bh 2,250,000.00 18,000,000.00 - 18,000,000.00
bh 992,500.00 7,940,000.00 - 7,940,000.00
bh 160,000.00 1,280,000.00 - 1,280,000.00
bh 341,000.00 2,728,000.00 - 2,728,000.00
ttk 300,000.00 2,400,000.00 - 2,400,000.00
ttk 342,600.00 2,740,800.00 - 2,740,800.00
- -
unit 25,000,000.00 25,000,000.00 25,000,000.00 50,000,000.00
- -
unit 13,400,000.00 26,800,000.00 - 26,800,000.00
bh 2,000,000.00 6,000,000.00 - 6,000,000.00
bh 2,125,200.00 6,375,600.00 - 6,375,600.00
bh 2,343,000.00 18,744,000.00 - 18,744,000.00
bh 995,800.00 7,966,400.00 - 7,966,400.00
bh 156,000.00 1,248,000.00 - 1,248,000.00
bh 340,000.00 2,720,000.00 - 2,720,000.00
ttk 300,000.00 4,200,000.00 - 4,200,000.00
ttk 340,000.00 4,760,000.00 - 4,760,000.00
- -
bh 2,050,000.00 8,200,000.00 - 8,200,000.00
bh 2,125,200.00 2,125,200.00 - 2,125,200.00
bh 2,343,792.00 9,375,168.00 - 9,375,168.00
bh 995,800.00 1,991,600.00 - 1,991,600.00
bh 156,000.00 624,000.00 - 624,000.00
bh 340,000.00 1,360,000.00 - 1,360,000.00
ttk 300,000.00 2,700,000.00 - 2,700,000.00
ttk 340,000.00 3,060,000.00 - 3,060,000.00
- -
bh 2,050,000.00 12,300,000.00 - 12,300,000.00
bh 2,125,200.00 - - -
bh 2,343,792.00 2,343,792.00 - 2,343,792.00
bh 995,800.00 1,991,600.00 - 1,991,600.00
bh 156,000.00 156,000.00 - 156,000.00
bh 340,000.00 340,000.00 - 340,000.00
ttk 300,000.00 2,100,000.00 - 2,100,000.00
JUMLAH HARGA
SAT. HRG. SATUAN
TAMBAH/
KONTRAK ADD I
KURANG
6 7 8 9 10 = 8 + 9
ttk 340,000.00 2,380,000.00 - 2,380,000.00
- -
bh 2,000,000.00 4,000,000.00 - 4,000,000.00
bh 2,125,200.00 - 2,125,200.00 2,125,200.00
ttk 300,000.00 600,000.00 300,000.00 900,000.00
ttk 342,000.00 684,000.00 342,000.00 1,026,000.00
Total 195,234,160.00 27,767,200.00 223,001,360.00
bh
bh 5,000,000.00 5,000,000.00 - 5,000,000.00
bh 3,600,000.00 3,600,000.00 - 3,600,000.00
bh - -
bh 3,000,000.00 3,000,000.00 - 3,000,000.00
bh 3,000,000.00 3,000,000.00 - 3,000,000.00
bh 3,500,000.00 3,500,000.00 - 3,500,000.00
bh 4,000,000.00 4,000,000.00 - 4,000,000.00
ls 3,000,000.00 3,000,000.00 - 3,000,000.00
bh 600,000.00 600,000.00 - 600,000.00
bh 1,500,000.00 1,500,000.00 - 1,500,000.00
bh 3,200,000.00 3,200,000.00 - 3,200,000.00
bh 700,000.00 700,000.00 - 700,000.00
bh 310,000.00 620,000.00 - 620,000.00
ttk 7,500.00 15,000.00 - 15,000.00
m' -
VOLUME
NO. URAIAN PEKERJAAN
KONTRAK CCO
1 2 3 4
V. PEKERJAAN BETON
45 Pek. Balok latei = 13x15 cm area kanopi sisi timur dan bar 0.000 0.702
46 Overstek besi yang masuk ke pondasi 0.000 2,261.028
V. PEKERJAAN BETON
32 Pek. Ring balok dudukan jendela J6 0.000 2.065
33 Overstek besi balok lantai 1 0.000 2,097.866
II PEKERJAAN LANTAI
4 Pek. Rangka Plafond Besi Hollow 0.000 932.307
5 Pek. Plafond Gypsumboard t=9mm 0.000 932.307
6 Pek. List Plafond Gypsum 10cm 0.000 826.121
8 PEKERJAAN SANITARY
a Lantai Basement
Closet Duduk Monoblok + Jet Washer 0.000 4.000
Wastafel Upper Counter 0.000 4.000
Meja beton wastafel 0.000 0.288
Meja Granite 0.000 6.720
Tempat Sabun Westafel 0.000 4.000
Tempat tissue 0.000 4.000
Kaca Cermin 0.000 4.000
Hand Dryer 0.000 4.000
Urinoir 0.000 5.000
Sekat Urinoir 0.000 4.000
Zink lengkap dengan kran 0.000 0.000
b Lantai 1
Closet Duduk Monoblok + Jet Washer 0.000 8.000
Wastafel Upper Counter 0.000 6.000
Meja beton wastafel 0.000 0.360
Meja Granite 0.000 8.400
Tempat Sabun Westafel 0.000 6.000
Tempat tissue 0.000 8.000
Kaca Cermin 0.000 5.000
Hand Dryer 0.000 5.000
Urinoir 0.000 6.000
Sekat Urinoir 0.000 5.000
Zink lengkap dengan kran 0.000 1.000
c Lantai 2
Closet Duduk Monoblok + Jet Washer 0.000 4.000
Wastafel Upper Counter 0.000 5.000
Meja beton wastafel 0.000 0.360
Meja Granite 0.000 8.400
Tempat Sabun Westafel 0.000 5.000
Tempat tissue 0.000 4.000
Kaca Cermin 0.000 4.000
Hand Dryer 0.000 4.000
Urinoir 0.000 6.000
Sekat Urinoir 0.000 5.000
Zink lengkap dengan kran 0.000 1.000
d Lantai 3
Closet Duduk Monoblok + Jet Washer 0.000 8.000
Wastafel Upper Counter 0.000 5.000
Meja beton wastafel 0.000 0.360
Meja Granite 0.000 8.400
Tempat Sabun Westafel 0.000 5.000
Tempat tissue 0.000 8.000
Kaca Cermin 0.000 5.000
Hand Dryer 0.000 5.000
Urinoir 0.000 6.000
Sekat Urinoir 0.000 5.000
Zink lengkap dengan kran 0.000 1.000
e Pos Security
Closet Jongkok 0.000 3.000
Ember 0.000 3.000
Kran Air 0.000 3.000
Floor Drain 0.000 3.000
TOTAL HARGA
Catatan : Untuk Item Pekerjaan yang menggunakan analisa baru dengan kode
Untuk Item Baru dengan analisa SNI sesuai penawaran Rab awal
RD KABUPATEN LOMBOK TIMUR
VOLUME JUM
SAT. KODE ANALISA HARGA SATUAN
SELISIH KONTRAK
5=4-3 6 5 7 8
25.00 mt ls Rp 115,300.00 Rp -
29.50 m2 Ls. Rp 80,000.00 Rp -
29.50 m2 SNI 2839:08.6.1.a Rp 49,503.96 Rp -
120.50 kg SNI 7393:08.6.1 Rp 26,405.20 Rp -
30.00 m2 ls Rp 150,000.00 Rp -
ARGA Rp -
CCO SELISIH
9 10 = 9 - 8
Rp 7,492,268.29 Rp 7,492,268.29
Rp 28,463,856.65 Rp 28,463,856.65
Rp 4,500,000.00 Rp 4,500,000.00
Rp 17,897,011.61 Rp 17,897,011.61
Rp 22,039,222.24 Rp 22,039,222.24
Rp 26,409,830.32 Rp 26,409,830.32
Rp 4,500,000.00 Rp 4,500,000.00
Rp 12,385,227.29 Rp 12,385,227.29
Rp 11,414,981.82 Rp 11,414,981.82
Rp 22,893,041.99 Rp 22,893,041.99
Rp 27,396,983.88 Rp 27,396,983.88
Rp 3,150,000.00 Rp 3,150,000.00
Rp 12,385,227.29 Rp 12,385,227.29
Rp 11,756,404.82 Rp 11,756,404.82
Rp 11,696,263.27 Rp 11,696,263.27
Rp 4,495,360.97 Rp 4,495,360.97
Rp 26,462,069.22 Rp 26,462,069.22
Rp 4,500,000.00 Rp 4,500,000.00
Rp 18,586,116.50 Rp 18,586,116.50
Rp 74,584,576.00 Rp 74,584,576.00
Rp 46,152,898.34 Rp 46,152,898.34
Rp 44,199,718.58 Rp 44,199,718.58
Rp 6,202,621.85 Rp 6,202,621.85
Rp 8,541,536.07 Rp 8,541,536.07
Rp 209,574,415.61 Rp 209,574,415.61
Rp 14,123,526.33 Rp 14,123,526.33
Rp 11,717,075.13 Rp 11,717,075.13
Rp 12,876,239.12 Rp 12,876,239.12
Rp 959,583.11 Rp 959,583.11
Rp 1,800,000.00 Rp 1,800,000.00
Rp 106,786,259.39 Rp 106,786,259.39
Rp 30,804,926.94 Rp 30,804,926.94
Rp 36,493,743.12 Rp 36,493,743.12
Rp 22,444,916.11 Rp 22,444,916.11
Rp 10,225,707.12 Rp 10,225,707.12
Rp 20,863,167.95 Rp 20,863,167.95
Rp 3,587,089.16 Rp 3,587,089.16
Rp 2,951,097.87 Rp 2,951,097.87
Rp 2,951,097.87 Rp 2,951,097.87
Rp 46,600,194.72 Rp 46,600,194.72
Rp 2,877,962.22 Rp 2,877,962.22
Rp 1,364,641.29 Rp 1,364,641.29
Rp 1,122,690.24 Rp 1,122,690.24
Rp 1,122,690.24 Rp 1,122,690.24
Rp 17,728,176.48 Rp 17,728,176.48
Rp 20,227,632.04 Rp 20,227,632.04
Rp 20,872,571.03 Rp 20,872,571.03
Rp 21,839,979.52 Rp 21,839,979.52
Rp 21,839,979.52 Rp 21,839,979.52
Rp 16,539,000.00 Rp 16,539,000.00
Rp 38,705,432.61 Rp 38,705,432.61
Rp 10,000,000.00 Rp 10,000,000.00
Rp 5,000,000.00 Rp 5,000,000.00
Rp 22,634,160.00 Rp 22,634,160.00
Rp 5,181,724.80 Rp 5,181,724.80
Rp 1,024,958.43 Rp 1,024,958.43
Rp 7,879,981.87 Rp 7,879,981.87
Rp 2,885,580.00 Rp 2,885,580.00
Rp 3,451,380.00 Rp 3,451,380.00
Rp 4,907,700.00 Rp 4,907,700.00
Rp 8,487,000.00 Rp 8,487,000.00
Rp 19,449,375.00 Rp 19,449,375.00
Rp 7,751,460.00 Rp 7,751,460.00
Rp - Rp -
Rp 45,268,320.00 Rp 45,268,320.00
Rp 7,772,587.20 Rp 7,772,587.20
Rp 1,281,198.04 Rp 1,281,198.04
Rp 9,849,977.34 Rp 9,849,977.34
Rp 4,328,370.00 Rp 4,328,370.00
Rp 6,902,760.00 Rp 6,902,760.00
Rp 6,134,625.00 Rp 6,134,625.00
Rp 10,608,750.00 Rp 10,608,750.00
Rp 23,339,250.00 Rp 23,339,250.00
Rp 9,689,325.00 Rp 9,689,325.00
Rp 1,611,405.60 Rp 1,611,405.60
Rp 22,634,160.00 Rp 22,634,160.00
Rp 6,477,156.00 Rp 6,477,156.00
Rp 1,281,198.04 Rp 1,281,198.04
Rp 9,849,977.34 Rp 9,849,977.34
Rp 3,606,975.00 Rp 3,606,975.00
Rp 3,451,380.00 Rp 3,451,380.00
Rp 4,907,700.00 Rp 4,907,700.00
Rp 8,487,000.00 Rp 8,487,000.00
Rp 23,339,250.00 Rp 23,339,250.00
Rp 9,689,325.00 Rp 9,689,325.00
Rp 1,611,405.60 Rp 1,611,405.60
Rp 45,268,320.00 Rp 45,268,320.00
Rp 6,477,156.00 Rp 6,477,156.00
Rp 1,281,198.04 Rp 1,281,198.04
Rp 9,849,977.34 Rp 9,849,977.34
Rp 3,606,975.00 Rp 3,606,975.00
Rp 6,902,760.00 Rp 6,902,760.00
Rp 6,134,625.00 Rp 6,134,625.00
Rp 10,608,750.00 Rp 10,608,750.00
Rp 23,339,250.00 Rp 23,339,250.00
Rp 9,689,325.00 Rp 9,689,325.00
Rp 1,611,405.60 Rp 1,611,405.60
Rp 3,288,462.00 Rp 3,288,462.00
Rp 600,000.00 Rp 600,000.00
Rp 429,000.00 Rp 429,000.00
Rp 690,000.00 Rp 690,000.00
Rp 2,882,500.00 Rp 2,882,500.00
Rp 2,360,000.00 Rp 2,360,000.00
Rp 1,460,366.82 Rp 1,460,366.82
Rp 3,181,826.60 Rp 3,181,826.60
Rp 9,900,000.00 Rp 9,900,000.00
Rp 35,488,588.80 Rp 35,488,588.80
Rp 790,400.00 Rp 790,400.00
Rp 2,806,572.25 Rp 2,806,572.25
Rp 454,435.97 Rp 454,435.97
Rp 170,000.00 Rp 170,000.00
Rp 34,500.00 Rp 34,500.00
Rp 32,000.00 Rp 32,000.00
Rp - Rp -
Rp 800,000.00 Rp 800,000.00
Rp 4,500,000.00 Rp 4,500,000.00
Rp 4,500,000.00 Rp 4,500,000.00
Rp 1,200,000.00 Rp 1,200,000.00
Rp 1,294,565.89 Rp 1,294,565.89
Rp 659,974.77 Rp 659,974.77
Rp 158,647.78 Rp 158,647.78
Rp 634,591.12 Rp 634,591.12
Rp 6,768,971.98 Rp 6,768,971.98
Rp 6,000,000.00 Rp 6,000,000.00
Rp 1,693,735,572.94 Rp 1,693,735,572.94
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR DPRD LOMBOK TIMUR
LOKASI : SELONG - LOMBOK TIMUR
TAHUN ANGGARAN : 2016/2017
A.8 1 bh Urinoir
Bahan:
1 Urinoir U57M bh
Upah Pasang dan Material Bantu ls
4 Mandor oh
2 Pek. Pas. Pondasi Batu Kali, Camp.1PC:5PS Panjang x Lebar x Tinggi 63.20 m3
Pondasi Batu Kali (horisontal) = 131.00 x 0.53 x 0.75 = 51.58
Pondasi Batu Kali (vertikal) = 29.50 x 0.53 x 0.75 = 11.62
4 Pek. Pas. Dinding Trassram 1/2Bt. Camp.1PC:3PS = 39.40 x 3.50 = 137.90 137.90 m2
6 Pek. Plesteran Trassram Bata, Camp.1PC:3PS Total Volume Pas. Dinding Bata Trasram x 2.00 = 1,836.05 1,836.05 m2
7 Pek. Plesteran Dinding Bata, Camp.1PC:5PS Total Volume Pas. Dinding Bata x 2.00 = 1,531.37 1,531.37 m2
= 969.20
Pengurangan Kolom (16 bh 60x60) = 16.00 x 0.36 = 5.76
= 963.44
2 Pek. Pas. Lantai Keramik 60x60cm Panjang x Lebar 347.27 m2
= 12.00 x 6.00 = 72.00
= 8.80 x 6.00 = 52.80
= 22.63 x 2.02 = 45.71
= 2.44 x 6.00 = 14.64
= 2.44 x 6.00 = 14.64
= 25.00 x 6.00 = 150.00
= 349.79
Pengurangan Kolom (7 bh 60x60) = 7.00 x 0.36 = 2.52
= 347.27
3 Pek. Pas. Lantai Keramik Tangga Panjang x Lebar
= 11.50 x 1.50 = 17.25 17.25 m2
V PEKERJAAN BETON
1 Pek. Lantai Kerja t=10cm, K.100 Panjang x Lebar x Tinggi x Jumlah 43.58 m3
FP.1 = 3.10 x 3.10 x 0.05 x 27.00 = 12.97
FP.2A = 2.70 x 2.70 x 0.05 x 6.00 = 2.19
FP.2 = 193.00 x 2.70 x 0.05 x 1.00 = 26.06
FP.3 = 2.20 x 2.20 x 0.05 x 2.00 = 0.48
FP.4 = 1.70 x 1.70 x 0.05 x 11.00 = 1.59
FP.5 = 1.20 x 1.20 x 0.05 x 4.00 = 0.29
2 Pek. Beton Cor Wiremesh Lantai t=20cm, K.250 Panjang x Lebar x Tinggi x Jumlah 240.73 m3
= 18.00 x 4.30 x 0.20 x 1.00 = 15.48
= 5.50 x 12.00 x 0.20 x 1.00 = 13.20
= 30.00 x 30.50 x 0.20 x 1.00 = 183.00
= 5.23 x 4.60 x 0.20 x 2.00 = 9.62
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
= 6.50 x 7.50 x 0.20 x 1.00 = 9.75
= 6.50 x 6.50 x 0.20 x 1.00 = 8.45
= 1.75 x 1.75 x 0.20 x 2.00 = 1.23
3 Pek. Pondasi Footplat FP.1=2,90m'x2,90m', K.250 Panjang x Lebar x Tinggi x Jumlah 84.56 m3
= 2.90 x 2.90 x 0.30 x 27.00 = 68.12
= 2.90 x 2.10 x 0.10 x 27.00 = 16.44
5 Pek. Pondasi Footplat FP.2.a=2,50x2,50m', K.250 Panjang x Lebar x Tinggi x Jumlah 13.58 m3
= 2.50 x 2.50 x 0.30 x 6.00 = 11.25
= 2.50 x 1.55 x 0.10 x 6.00 = 2.33
4 Pek. Pondasi Footplat FP.2=2,50m'x203,00m', K.250 Panjang x Lebar x Tinggi x Jumlah 190.05 m3
= 210.00 x 1.55 x 0.10 x 1.00 = 32.55
= 210.00 x 2.50 x 0.30 x 1.00 = 157.50
6 Pek. Pondasi Footplat FP.3=2,00x2,00m', K.250 Panjang x Lebar x Tinggi x Jumlah 2.92 m3
= 2.00 x 2.00 x 0.30 x 2.00 = 2.40
= 2.00 x 1.30 x 0.10 x 2.00 = 0.52
7 Pek. Pondasi Footplat FP.4=1,50x1,50m', K.250 Panjang x Lebar x Tinggi x Jumlah 7.84 m3
= 1.50 x 1.50 x 0.30 x 11.00 = 7.43
= 1.50 x 0.25 x 0.10 x 11.00 = 0.41
8 Pek. Pondasi Footplat FP.5=1,00x1,00m', K.250 Panjang x Lebar x Tinggi x Jumlah 1.50 m3
= 1.00 x 1.00 x 0.30 x 4.00 = 1.20
= 1.00 x 0.75 x 0.10 x 4.00 = 0.30
9 Pek. Pondasi Footplat Tangga =1,00x1,50m', K.250 Panjang x Lebar x Tinggi x Jumlah 0.55 m3
= 1.00 x 1.50 x 0.30 x 1.00 = 0.45
= 1.00 x 1.00 x 0.10 x 1.00 = 0.10
10 Pek. Sloof Beton S.1=20x40cm', K.250 Panjang x Lebar x Tinggi x Jumlah 1.34 m3
= 8.40 x 0.20 x 0.40 x 2.00 = 1.34
11 Pek. Sloof Beton S.2=20x30m', K.250 Panjang x Lebar x Tinggi x Jumlah 39.92 m3
MEMANJANG = 0.90 x 0.20 x 0.30 x 2.00 = 0.11
= 1.00 x 0.20 x 0.30 x 2.00 = 0.12
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
= 4.60 x 0.20 x 0.30 x 2.00 = 0.55
= 4.90 x 0.20 x 0.30 x 18.00 = 5.29
= 5.40 x 0.20 x 0.30 x 12.00 = 3.89
= 5.90 x 0.20 x 0.30 x 29.00 = 10.27
MELINTANG = 1.08 x 0.20 x 0.30 x 4.00 = 0.26
= 2.40 x 0.20 x 0.30 x 2.00 = 0.29
= 3.25 x 0.20 x 0.30 x 2.00 = 0.39
= 5.40 x 0.20 x 0.30 x 51.00 = 16.52
= 5.80 x 0.20 x 0.30 x 2.00 = 0.70
= 5.90 x 0.20 x 0.30 x 2.00 = 0.71
= 6.90 x 0.20 x 0.30 x 2.00 = 0.83
12 Pek. Sloof Beton S.3=15x20cm, K.250 Panjang x Lebar x Tinggi x Jumlah 2.030 m3
= 67.65 x 0.15 x 0.20 x 1.00 = 2.03
13 Pek. Kolom Beton Pedstal K.1 = 60x60cm', K.250 Panjang x Lebar x Tinggi x Jumlah 60.84 m3
= 0.60 x 0.60 x 2.60 x 65.00 = 60.84
14 Pek. Kolom Beton Pedstal K.2 = 60x60cm', K.250 Panjang x Lebar x Tinggi x Jumlah 1.87 m3
= 0.60 x 0.60 x 2.60 x 2.00 = 1.87
15 Pek. Kolom Beton Pedstal K.3 = 60x60cm', K.250 Panjang x Lebar x Tinggi x Jumlah 3.74 m3
= 0.60 x 0.60 x 2.60 x 4.00 = 3.74
16 Pek. Kolom Beton Pedstal K.8 = 30x30cm', K.250 Panjang x Lebar x Tinggi x Jumlah 1.87 m3
= 0.30 x 0.30 x 2.60 x 8.00 = 1.87
17 Pek. Kolom Beton Pedstal K.10 = 15x45cm', K.250 Panjang x Lebar x Tinggi x Jumlah 0.70 m3
= 0.15 x 0.45 x 2.60 x 4.00 = 0.70
18 Pek. Kolom Beton K.1 = 60x60cm', K.250 Panjang x Lebar x Tinggi x Jumlah 81.90 m3
= 0.60 x 0.60 x 3.50 x 65.00 = 81.90
19 Pek. Kolom Beton K.2 = 60x60cm', K.250 Panjang x Lebar x Tinggi x Jumlah 2.52 m3
= 0.60 x 0.60 x 3.50 x 2.00 = 2.52
20 Pek. Kolom Beton K.3 = 60x60cm', K.250 Panjang x Lebar x Tinggi x Jumlah 5.04 m3
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
= 0.60 x 0.60 x 3.50 x 4.00 = 5.04
21 Pek. Kolom Beton K.8 = 30x30cm', K.250 Panjang x Lebar x Tinggi x Jumlah 2.52 m3
= 0.30 x 0.30 x 3.50 x 8.00 = 2.52
22 Pek. Kolom Beton K.10 = 15x45cm', K.250 Panjang x Lebar x Tinggi x Jumlah 0.95 m3
= 0.15 x 0.45 x 3.50 x 4.00 = 0.95
23 Pek. Kolom Beton Praktis KP.1 =13x13cm, K.250 Panjang x Lebar x Tinggi x Jumlah 2.31 m3
= 0.13 x 0.13 x 3.50 x 39.00 = 2.31
24 Pek. Kolom Beton Praktis KP.2 = 15x30cm, K.250 Panjang x Lebar x Tinggi x Jumlah 2.05 m3
= 0.15 x 0.30 x 3.50 x 13.00 = 2.05
25 Pek. Balok Beton B.1 = 25x75cm, K.250 Panjang x Lebar x Tinggi x Jumlah 3.15 m3
Level lantai 1 = 16.80 x 0.25 x 0.75 x 1.00 = 3.15
26 Pek. Balok Beton B.3 = 25x60cm, K.250 Panjang x Lebar x Tinggi x Jumlah 16.73 m3
Level lantai 1 = 111.50 x 0.25 x 0.60 x 1.00 = 16.73
27 Pek. Balok Beton B.4 = 25x60cm, K.250 Panjang x Lebar x Tinggi x Jumlah 13.995 m3
Level lantai 1 = 93.30 x 0.25 x 0.60 x 1.00 = 13.995
28 Pek. Balok Beton B.5 = 25x60cm, K.250 Panjang x Lebar x Tinggi x Jumlah 13.04 m3
Level lantai 1 = 86.90 x 0.25 x 0.60 x 1.00 = 13.04
29 Pek. Balok Beton B.7 = 25x50cm, K.250 Panjang x Lebar x Tinggi x Jumlah 10.00 m3
30 Pek. Balok Beton B.8 = 25x50cm, K.250 Panjang x Lebar x Tinggi x Jumlah 1.35 m3
Level lantai 1 = 10.80 x 0.25 x 0.50 x 1.00 = 1.35
31 Pek. Balok Beton B.9 = 25x50cm, K.250 Panjang x Lebar x Tinggi x Jumlah 3.10 m3
Level lantai 1 = 24.83 x 0.25 x 0.50 x 1.00 = 3.10
32 Pek. Balok Beton B.12 = 25x50cm, K.250 Panjang x Lebar x Tinggi x Jumlah 2.89 m3
Level lantai 1 = 23.10 x 0.25 x 0.50 x 1.00 = 2.89
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
33 Pek. Balok Beton B.13 = 25x50cm, K.250 Panjang x Lebar x Tinggi x Jumlah 3.80 m3
Level lantai 1 = 30.40 x 0.25 x 0.50 x 1.00 = 3.80
34 Pek. Balok Beton B.14 = 25x50cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.74 m3
Level lantai 1 = 5.90 x 0.25 x 0.50 x 1.00 = 0.74
35 Pek. Balok Beton B.15 = 25x40cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.62 m3
Level lantai 1 = 6.20 x 0.25 x 0.40 x 1.00 = 0.62
36 Pek. Balok Beton B.16 = 20x45cm, K.250 Panjang x Lebar x Tinggi x Jumlah 11.24 m3
Level lantai 1 = 124.90 x 0.20 x 0.45 x 1.00 = 11.24
37 Pek. Balok Beton B.17 = 20x45cm, K.250 Panjang x Lebar x Tinggi x Jumlah 10.08 m3
Level lantai 1 = 112.03 x 0.20 x 0.45 x 1.00 = 10.08
38 Pek. Balok Beton B.19 = 20x40cm, K.250 Panjang x Lebar x Tinggi x Jumlah 1.47 m3
Level lantai 1 = 18.40 x 0.20 x 0.40 x 1.00 = 1.47
39 Pek. Balok Beton B.22 = 15x30cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.37 m3
Level lantai 1 = 8.27 x 0.15 x 0.30 x 1.00 = 0.37
40 Pek. Balok Beton BP = 15x25cm, K.250 Panjang x Lebar x Tinggi x Jumlah 4.19 m3
Level lantai 1 = 111.73 x 0.15 x 0.25 x 1.00 = 4.19
41 Pek. Balok Bordes Tangga = 15x25cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.33 m3
Level lantai 1 = 8.70 x 0.15 x 0.25 x 1.00 = 0.33
42 Pek. Plat Lantai Beton t=12cm, K.250 Luas x Tebal x Jumlah 150.34 m3
= 30.96 x 0.12 x 1.00 = 3.72
= 30.70 x 0.12 x 1.00 = 3.68
43 Pek. Plat Tangga Beton t=15cm, K.250 Panjang x Lebar x Tinggi x Jumlah 2.18 m3
= 9.70 1.50 0.15 1.00 = 2.18
44 Pek. Listplank Beton t=7cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.79 m3
= 37.80 0.30 0.07 1.00 = 0.79
VI PEKERJAAN KAYU
1 Pek. Kusen Kayu, Klas I Lebar x Jumlah x Luas 0.51 m3
P3 = 0.13 x 5.00 x 0.28 = 0.18
P4 = 0.13 x 7.00 x 0.24 = 0.21
P5 = 0.13 x 4.00 x 0.23 = 0.12
= 0.51
2 Pek. Daun Pintu Panil + Kaca 5mm, Klas II Jumlah x Luas 25.84 m2
P3 = 5.00 x 3.04 = 15.20
P4 = 7.00 x 1.52 = 10.64
= 25.84
3 Pek. Daun Pintu Tripleks Lapis Alluminium Jumlah x Luas
4 Pek. Plesteran Dinding Bata, Camp.1PC:5PS = Volume Pas Dinding Bata x 2.00
= 1,063.78 x 2.00 = 2,127.57 2,127.57 m2
V PEKERJAAN BETON
1 Pek. Kolom Beton K.4 = 50x50cm, K.250 Panjang x Lebar x Tinggi x Jumlah 55.46 m3
= 0.50 x 0.50 x 4.35 x 51.00 = 55.46
2 Pek. Kolom Beton K.8 = 30x30cm, K.250 Panjang x Lebar x Tinggi x Jumlah 2.35 m3
= 0.30 x 0.30 x 4.35 x 6.00 = 2.35
3 Pek. Kolom Beton K.9 = 25x25cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.96 m3
4 Pek. Kolom Beton K.10 = 15x45cm, K.250 Panjang x Lebar x Tinggi x Jumlah 1.17 m3
= 0.15 x 0.45 x 4.35 x 4.00 = 1.17
5 Pek. Kolom Beton K.11 = dia.50cm, K.250 Panjang x Lebar x Tinggi x Jumlah 13.67 m3
= 0.50 x 0.20 x 4.35 x 16.00 = 13.67
6 Pek. Kolom Beton K.12 = dia.50cm, K.250 Dia x Luas Selimut x Tinggi x Jumlah 8.99 m3
= 0.50 x 0.20 x 4.35 x 4.00 = 3.42
= 0.50 x 0.20 x 7.10 x 4.00 = 5.58
7 Pek. Kolom Beton Praktis KP.1 =13x13cm, K.250 Panjang x Lebar x Tinggi x Jumlah 7.65 m3
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
= 0.13 x 0.13 x 4.35 x 104.00 = 7.65
8 Pek. Balok Beton B.1 = 25x75cm, K.250 Panjang x Lebar x Tinggi x Jumlah 3.15 m3
= 16.80 x 0.25 x 0.75 x 1.00 = 3.15
9 Pek. Balok Beton B.2 = 25x75cm, K.250 Panjang x Lebar x Tinggi x Jumlah 4.44 m3
= 23.66 x 0.25 x 0.75 x 1.00 = 4.44
10 Pek. Balok Beton B.3 = 25x60cm, K.250 Panjang x Lebar x Tinggi x Jumlah 17.33 m3
= 115.50 x 0.25 x 0.60 x 1.00 = 17.33
11 Pek. Balok Beton B.4 = 25x60cm, K.250 Panjang x Lebar x Tinggi x Jumlah 15.62 m3
= 104.16 x 0.25 x 0.60 x 1.00 = 15.62
12 Pek. Balok Beton B.5 = 25x60cm, K.250 Panjang x Lebar x Tinggi x Jumlah 9.75 m3
= 65.00 x 0.25 x 0.60 x 1.00 = 9.75
13 Pek. Balok Beton B.6 = 25x50cm, K.250 Panjang x Lebar x Tinggi x Jumlah 3.59 m3
= 28.70 x 0.25 x 0.50 x 1.00 = 3.59
14 Pek. Balok Beton B.7 = 25x50cm, K.250 Panjang x Lebar x Tinggi x Jumlah 4.75 m3
= 38.00 x 0.25 x 0.50 x 1.00 = 4.75
15 Pek. Balok Beton B.8 = 25x50cm, K.250 Panjang x Lebar x Tinggi x Jumlah 3.35 m3
= 26.76 x 0.25 x 0.50 x 1.00 = 3.35
16 Pek. Balok Beton B.9 = 25x50cm, K.250 Panjang x Lebar x Tinggi x Jumlah 1.43 m3
= 11.46 x 0.25 x 0.50 x 1.00 = 1.43
17 Pek. Balok Beton B.10 = 25x60cm, K.250 Panjang x Lebar x Tinggi x Jumlah 7.40 m3
= 49.30 x 0.25 x 0.60 x 1.00 = 7.40
18 Pek. Balok Beton B.12 = 25x50cm, K.250 Panjang x Lebar x Tinggi x Jumlah 8.04 m3
= 64.28 x 0.25 x 0.50 x 1.00 = 8.04
19 Pek. Balok Beton B.13 = 25x50cm, K.250 Panjang x Lebar x Tinggi x Jumlah 12.24 m3
= 97.90 x 0.25 x 0.50 x 1.00 = 12.24
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
20 Pek. Balok Beton B.14 = 25x50cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.68 m3
= 5.40 x 0.25 x 0.50 x 1.00 = 0.68
21 Pek. Balok Beton B.16 = 20x45cm, K.250 Panjang x Lebar x Tinggi x Jumlah 19.50 m3
= 216.71 x 0.20 x 0.45 x 1.00 = 19.50
22 Pek. Balok Beton B.17 = 20x45cm, K.250 Panjang x Lebar x Tinggi x Jumlah 7.40 m3
= 82.23 x 0.20 x 0.45 x 1.00 = 7.40
23 Pek. Balok Beton B.20 = 20x40cm, K.250 Panjang x Lebar x Tinggi x Jumlah 2.69 m3
= 33.60 x 0.20 x 0.40 x 1.00 = 2.69
24 Pek. Balok Beton B.22 = 15x30cm, K.250 Panjang x Lebar x Tinggi x Jumlah 5.86 m3
= 130.25 x 0.15 x 0.30 x 1.00 = 5.86
25 Pek. Balok Beton BP = 15x25cm, K.250 Panjang x Lebar x Tinggi x Jumlah 2.94 m3
= 78.41 x 0.15 x 0.25 x 1.00 = 2.94
26 Pek. Balok Praktis = 15x25cm, K.250 Panjang x Lebar x Tinggi x Jumlah 2.06 m3
= 55.00 x 0.15 x 0.25 x 1.00 = 2.06
27 Pek. Balok Bordes Tangga = 15x25cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.99 m3
= 26.40 x 0.15 x 0.25 x 1.00 = 0.99
28 Pek. Plat Lantai Beton t=12cm, K.250 ( Elv +4,35) Luas x Tebal x Jumlah 193.17 m3
elevasi +4,35 = 1.71 x 0.12 x 14.00 = 2.88
= 1.87 x 0.12 x 6.00 = 1.35
= 18.74 x 0.12 x 6.00 = 13.49
= 15.64 x 0.12 x 2.00 = 3.75
= 17.19 x 0.12 x 17.00 = 35.06
= 15.68 x 0.12 x 9.00 = 16.93
= 4.71 x 0.12 x 2.00 = 1.13
29 Pek. Plat Tangga Beton t=15cm, K.250 Panjang x Lebar x Tinggi x Jumlah 6.68 m3
= 9.90 x 1.50 x 0.15 x 3.00 = 6.68
30 Pek. Plat Sunscreen Beton t=7cm, K.250 Panjang x Lebar x Tinggi x Jumlah 4.79 m3
= 7.80 x 4.00 0.07 x 2.00 = 4.37
= 1.50 x 4.00 0.07 x 1.00 0.42
31 Pek. Listplank Beton t=7cm, K.250 Panjang x Lebar x Tinggi x Jumlah 8.25 m3
= 196.40 x 0.60 x 0.07 x 1.00 = 8.25
VI PEKERJAAN KAYU
1 Pek. Kusen Kayu, Klas I Panjang x Lebar x Tinggi x Jumlah 4.68 m3
PJ.1 = 17.90 x 0.05 x 0.13 x 1.00 = 0.12
PJ.2 = 17.90 x 0.05 x 0.13 x 1.00 = 0.12
PJ.3 = 20.65 x 0.05 x 0.13 x 2.00 = 0.27
P.1 = 10.15 x 0.05 x 0.13 x 9.00 = 0.59
P.2 = 7.90 x 0.05 x 0.13 x 3.00 = 0.15
P5 = 4.90 x 0.05 x 0.13 x 8.00 = 0.25
J.1 = 18.50 x 0.05 x 0.13 x 2.00 = 0.24
J.2 = 11.25 x 0.05 x 0.13 x 34.00 = 2.49
J.6 = 63.00 x 0.05 x 0.13 x 1.00 = 0.41
V.1 = 2.90 x 0.05 x 0.13 x 2.00 = 0.04
2 Pek. Daun Pintu Panil + Kaca 5mm, Klas II Panjang x Lebar x Jumlah 49.92 m2
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
PJ.1 = 1.60 x 2.40 x 1.00 = 3.84
PJ.2 = 1.60 x 2.40 x 1.00 = 3.84
PJ.3 = 1.60 x 2.40 x 2.00 = 7.68
P.1 = 1.60 x 2.40 x 9.00 = 34.56
5 Pek. Daun Jendela Kaca 5mm + Ventilasi, Klas II Panjang x Lebar Jumlah 114.65 m2
PJ.1 = 2.40 x 0.55 1.00 = 1.32
PJ.2 = 2.40 x 0.55 1.00 = 1.32
PJ.3 = 1.60 x 0.55 2.00 = 1.76
P.1 = 1.60 x 0.55 9.00 = 7.92
P.2 = 0.80 x 0.55 3.00 = 1.32
J.1 = 0.95 x 0.55 2.00 = 1.05
J.2 = 1.40 x 2.10 34.00 = 99.96
8 Pek. List GRC Kusen Pintu Dan Jendela Panjang Jumlah 346.60 m'
PJ.1 = 9.90 x 1.00 = 9.90
PJ.2 = 9.90 x 1.00 = 9.90
PJ.3 = 10.20 x 2.00 = 20.40
J.1 = 10.40 x 2.00 = 20.80
J.2 = 8.40 x 34.00 = 285.60
3 Pek. Plesteran Trassram Bata, Camp.1PC:3PS Volume Pas. Dinding Trassram = 211.90 211.90 m2
4 Pek. Plesteran Dinding Bata, Camp.1PC:5PS Volume Pas. Dinding Bata x 2.00 = 2,820.48 2,820.48 m2
5 Pek. Pas. Lantai Keramik KM/WC 20x20cm Panjang x Lebar x Jumlah 9.15 m2
= 1.50 x 1.50 x 3.00 = 6.75
= 1.50 x 1.60 x 1.00 = 2.40
6 Pek. Pas. Keramik Dinding KM/WC 20x40cm Panjang x Tinggi x Jumlah 128.29 m2
= 5.20 x 1.80 x 3.00 = 28.08
= 5.70 x 1.80 x 1.00 = 10.26
= 6.15 x 1.80 x 2.00 = 22.14
= 12.05 x 1.80 x 1.00 = 21.69
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
= 17.45 x 1.80 x 1.00 = 31.41
Tmpat Wudu' = 8.17 x 1.80 x 1.00 = 14.71
= 48.05 = 48.05
= 221.46 = 221.46
= 95.64 = 95.64
= 865.00 = 865.00
tritisan = 62.58 = 62.58
pengurangan kolom = 5.40
2 Pek. Kolom Beton K.9 = 25x25cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.54 m3
= 0.25 0.25 4.35 2.00 = 0.54
3 Pek. Kolom Beton K.10 = 15x45cm, K.250 Panjang x Lebar x Tinggi x Jumlah 1.17 m3
= 0.15 0.45 4.35 4.00 = 1.17
4 Pek. Kolom Beton K.12 = dia.50cm, K.250 Dia x Luas Selimut x Tinggi x Jumlah 11.95 m3
= 0.50 0.20 4.35 14.00 = 11.95
5 Pek. Kolom Beton Praktis KP.1 =13x13cm, K.250 Panjang x Lebar x Tinggi x Jumlah 7.65 m3
= 0.13 0.13 4.35 104.00 = 7.65
6 Pek. Kolom Beton Praktis KP.2 = 15x30cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.39 m3
= 0.15 0.30 4.35 2.00 = 0.39
7 Pek. Kolom Beton K.8 = 30x30cm, K.250 Panjang x Lebar x Tinggi x Jumlah 1.57 m3
= 0.30 x 0.30 x 4.35 x 4.00 = 1.57
7 Pek. Balok Beton B.1 = 25x75cm, K.250 Panjang x Lebar x Tinggi x Jumlah 4.13 m3
Elv. 10.10 = 22.00 0.25 0.75 1.00 = 4.13
8 Pek. Balok Beton B.2 = 25x75cm, K.250 Panjang x Lebar x Tinggi x Jumlah 1.13 m3
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
Elv. 10.10 = 3.00 0.25 0.75 2.00 = 1.13
9 Pek. Balok Beton B.3 = 25x60cm, K.250 Panjang x Lebar x Tinggi x Jumlah 20.36 m3
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
10 Pek. Balok Beton B.4 = 25x60cm, K.250 Panjang x Lebar x Tinggi x Jumlah 3.30 m3
Elv. 10.10 = 22.00 0.25 0.60 1.00 = 3.30
11 Pek. Balok Beton B.5 = 25x60cm, K.250 Panjang x Lebar x Tinggi x Jumlah 15.68 m3
Elv. 10.10 = 104.50 0.25 0.60 1.00 = 15.68
12 Pek. Balok Beton B.7 = 25x50cm, K.250 Panjang x Lebar x Tinggi x Jumlah 1.28 m3
Elv. 10.10 = 10.26 0.25 0.50 1.00 = 1.28
13 Pek. Balok Beton B.9 = 25x50cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.69 m3
Elv. 10.10 = 5.50 0.25 0.50 1.00 = 0.69
14 Pek. Balok Beton B.12 = 25x50cm, K.250 Panjang x Lebar x Tinggi x Jumlah 15.48 m3
Elv. 10.10 = 123.80 0.25 0.50 1.00 = 15.48
15 Pek. Balok Beton B.13 = 25x50cm, K.250 Panjang x Lebar x Tinggi x Jumlah 25.05 m3
Elv. 10.10 = 200.40 0.25 0.50 1.00 = 25.05
16 Pek. Balok Beton B.14 = 25x50cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.68 m3
Elv. 10.10 = 5.40 0.25 0.50 1.00 = 0.68
17 Pek. Balok Beton B.16 = 20x45cm, K.250 Panjang x Lebar x Tinggi x Jumlah 10.73 m3
Elv. 10.10 = 119.27 0.20 0.45 1.00 = 10.73
18 Pek. Balok Beton B.17 = 20x45cm, K.250 Panjang x Lebar x Tinggi x Jumlah 15.42 m3
Elv. 10.10 = 171.37 0.20 0.45 1.00 = 15.42
19 Pek. Balok Beton B.20 = 20x40cm, K.250 Panjang x Lebar x Tinggi x Jumlah 4.33 m3
Elv. 10.10 = 54.16 0.20 0.40 1.00 = 4.33
20 Pek. Balok Beton B.22 = 15x30cm, K.250 Panjang x Lebar x Tinggi x Jumlah 7.95 m3
Elv. 10.10 = 176.60 0.15 0.30 1.00 = 7.95
20a Pek. Balok Beton B.21 = 20x35cm, K.250 Panjang x Lebar x Tinggi x Jumlah 7.70 m3
di lumbung = 44.00 0.25 0.35 2.00 = 7.70
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
21 Pek. Balok Beton BM.1 = 25x60cm, K.250 Panjang x Lebar x Tinggi x Jumlah 1.41 m3
Elv. 10.10 = 9.41 0.25 0.60 1.00 = 1.41
22 Pek. Balok Beton BP = 15x25cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.67 m3
Elv. 10.10 = 9.41 0.15 0.25 1.00 = 0.35
di lumbung = 2.12 0.15 0.25 4.00 = 0.32
23 Pek. Balok Bordes Tangga = 15x25cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.99 m3
Elv. 10.10 = 26.40 0.15 0.25 1.00 = 0.99
24 Pek. Plat Lantai Beton t=12cm, K.250 Luas x Tebal x Jumlah 180.22 m3
Elv. 10.10 = 3.33 x 0.12 x 15.00 = 6.00
= 1.78 x 0.12 x 10.00 = 2.13
= 28.36 x 0.12 x 1.00 = 3.40
= 25.61 x 0.12 x 1.00 = 3.07
= 16.31 x 0.12 x 17.00 = 33.27
= 14.87 x 0.12 x 28.00 = 49.97
= 4.47 x 0.12 x 2.00 = 1.07
= 5.28 x 0.12 x 1.00 = 0.63
= 17.74 x 0.12 x 35.00 = 74.52
= 13.21 x 0.12 x 1.00 = 1.59
= 2.44 x 0.12 x 2.00 = 0.59
= 7.00 x 0.12 x 2.00 = 1.68
= 9.57 x 0.12 x 2.00 = 2.30
25 Pek. Plat Lantai Beton Ruang Sidang t=15cm, K.250 Panjang x Tinggi x Jumlah 35.60 m3
Elv. 10.10 = 6.29 0.15 2.00 = 1.89
= 12.25 0.15 1.00 = 1.84
= 17.71 0.15 12.00 = 31.87
26 Pek. Plat Tangga Beton t=15cm, K.250 (Elv : 8,7) Panjang x Lebar x Tinggi x Jumlah 6.68 m3
Elv. 10.10 = 9.90 1.50 0.15 3.00 = 6.68
27 Pek. Listplank Beton t=7cm, K.250 Panjang x Lebar x Tinggi x Jumlah 8.25 m3
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
Elv. 10.10 = 196.40 x 0.60 x 0.07 x 1.00 = 8.25
IV PEKERJAAN KAYU
1 Pek. Kusen Kayu, Klas I Panjang lebar x Tinggi x Jumlah 4.81 m3
PJ4 = 23.30 0.050 x 0.13 x 1.00 = 0.15
P1 = 8.35 0.050 x 0.13 x 16.00 = 0.87
P2 = 6.20 0.050 x 0.13 x 3.00 = 0.12
2 Pek. Daun Pintu Panil + Kaca 5mm, Klas II Panjang x Lebar x x Jumlah 65.28 m2
PJ.4 = 1.60 x 2.40 x x 1.00 = 3.84
P.1 = 1.60 x 2.40 x x 16.00 = 61.44
4 Pek. Daun Pintu Tripleks Lapis Alluminium Panjang x Lebar x x Jumlah 5.60 m2
P5 = 0.70 x 2.00 x x 4.00 = 5.60
5 Pek. Daun Jendela Kaca 5mm + Ventilasi, Klas II Panjang x Lebar x x Jumlah 131.96 m2
PJ.4 = 3.20 x 0.55 x x 1.00 = 1.76
P.1 = 1.60 x 0.55 x x 16.00 = 14.08
P.2 = 0.80 x 0.55 x x 3.00 = 1.32
J.2 = 1.40 x 2.05 x x 40.00 = 114.80
7 Pek. List GRC Kusen Pintu Dan Jendela Panjang x Jumlah 311.25 m'
PJ.4 = 11.25 x 1.00 = 11.25
J.2 = 7.50 x 40.00 = 300.00
VI PEKERJAAN PENGECATAN
1 Pek. Cat Kayu Panjang x Lebar x Jumlah 346.28 m2
PJ.4 = 17.90 x 0.36 x 1.00 = 6.44
P.1 = 10.15 x 0.36 x 16.00 = 58.46
P.2 = 7.90 x 0.36 x 3.00 = 8.53
P5 = 4.90 x 0.36 x 4.00 = 7.06
J.2 = 11.25 x 0.36 x 40.00 = 162.00
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
J.3 = 8.35 x 0.36 x 2.00 = 6.01
J.4 = 13.95 x 0.36 x 4.00 = 20.09
V.1 = 2.90 x 0.36 x 1.00 = 1.04
PJ.4 = 1.60 x 2.40 x 1.00 = 3.84
P.1 = 1.60 x 2.40 x 16.00 = 61.44
P.2 = 0.80 x 2.40 x 3.00 = 5.76
P5 = 0.70 x 2.00 x 4.00 = 5.60
3 Pek. Plesteran Trassram Bata, Camp.1PC:3PS Volume Pas. Dinding Trassram = 232.13 232.13 m2
4 Pek. Plesteran Dinding Bata, Camp.1PC:5PS Volume Pas. Dinding Bata x 2.00 = 3,354.88 3,354.88 m2
5 Pek. Pas. Lantai Keramik KM/WC 20x20cm Panjang x Lebar x Jumlah 16.88 m2
= 1.50 x 1.50 x 5.00 = 11.25
= 1.50 x 1.60 x 1.00 = 2.40
= 1.50 x 2.15 x 1.00 = 3.23
6 Pek. Pas. Keramik Dinding KM/WC 20x40cm Panjang x Lebar x Jumlah 128.29 m2
= 5.20 x 1.80 x 3.00 = 28.08
= 5.70 x 1.80 x 1.00 = 10.26
= 6.15 x 1.80 x 2.00 = 22.14
= 12.05 x 1.80 x 1.00 = 21.69
= 17.45 x 1.80 x 1.00 = 31.41
Tmpt. Wudu' = 8.17 x 1.80 x 1.00 = 14.71
2 Pek. Kolom Beton K.9 = 25x25cm, K.250 Panjang x Lebar x Tinggi x Jumlah 3.01 m3
= 0.25 0.25 4.35 6.00 = 1.63
= 0.25 0.25 2.00 2.00 = 0.25
= 0.25 0.25 3.00 6.00 = 1.13
3 Pek. Kolom Beton K.10 = 15x45cm, K.250 Panjang x Lebar x Tinggi x Jumlah 1.71 m3
= 0.15 0.45 4.35 4.00 = 1.17
4 Pek. Kolom Beton Praktis KP.1 =13x13cm, K.250 Panjang x Lebar x Tinggi x Jumlah 13.82 m3
= 0.13 0.13 4.35 188.00 = 13.82
5 Pek. Kolom Beton Praktis KP.2 = 15x30cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.57 m3
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
= 0.15 0.30 4.35 2.00 0.39
= 0.15 0.30 2.00 2.00 = 0.18
5 Pek. Kolom Beton K.8 = 30x30cm, K.250 Panjang x Lebar x Tinggi x Jumlah 1.57 m3
= 0.30 x 0.30 x 4.35 x 4.00 = 1.57
6 Pek. Balok Beton B.4 = 25x60cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.92 m3
= 6.10 0.25 0.60 1.00 = 0.92
7 Pek. Balok Beton B.5 = 25x60cm, K.250 Panjang x Lebar x Tinggi x Jumlah 4.58 m3
= 30.50 0.25 0.60 1.00 = 4.58
8 Pek. Balok Beton B.7 = 25x50cm, K.250 Panjang x Lebar x Tinggi x Jumlah 1.23 m3
= 9.80 0.25 0.50 1.00 = 1.23
9 Pek. Balok Beton B.10 = 25x60cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.84 m3
= 5.60 0.25 0.60 1.00 = 0.84
10 Pek. Balok Beton B.11 = 25x60cm, K.250 Panjang x Lebar x Tinggi x Jumlah 7.56 m3
= 50.40 0.25 0.60 1.00 = 7.56
11 Pek. Balok Beton B.12 = 25x50cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.76 m3
= 6.10 0.25 0.50 1.00 = 0.76
12 Pek. Balok Beton B.13 = 25x50cm, K.250 Panjang x Lebar x Tinggi x Jumlah 15.13 m3
= 121.00 0.25 0.50 1.00 = 15.13
13 Pek. Balok Beton B.14 = 25x50cm, K.250 Panjang x Lebar x Tinggi x Jumlah 11.10 m3
= 88.80 0.25 0.50 1.00 = 11.10
14 Pek. Balok Beton B.16 = 20x45cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.55 m3
= 6.10 0.20 0.45 1.00 = 0.55
15 Pek. Balok Beton B.17 = 20x45cm, K.250 Panjang x Lebar x Tinggi x Jumlah 2.21 m3
= 24.58 0.20 0.45 1.00 = 2.21
16 Pek. Balok Beton B.18 = 20x45cm, K.250 Panjang x Lebar x Tinggi x Jumlah 2.03 m3
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
= 22.50 0.20 0.45 1.00 = 2.03
17 Pek. Balok Beton B.20 = 20x40cm, K.250 Panjang x Lebar x Tinggi x Jumlah 13.60 m3
= 170.01 0.20 0.40 1.00 = 13.60
18 Pek. Balok Beton B.21 = 20x35cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.80 m3
= 11.40 0.20 0.35 1.00 = 0.80
19 Pek. Balok Beton B.22 = 15x30cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.98 m3
= 21.77 0.15 0.30 1.00 = 0.98
20 Pek. Balok Bordes Tangga = 15x25cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.74 m3
= 19.85 0.15 0.25 1.00 = 0.74
21 Pek. Plat Lantai Beton t=12cm, K.250 Luas x Tebal x Jumlah 20.75 m3
elevasi 12,25 = 172.95 x 0.12 x 1.00 = 20.75
22 Pek. Plat Atap Beton t=12cm, K.250 Luas x Tebal x Jumlah 73.05 m3
= 14.48 x 0.12 x 22.00 = 38.23
= 17.24 x 0.12 x 10.00 = 20.69
= 12.86 x 0.12 x 1.00 = 1.54
= 8.40 x 0.12 x 2.00 = 2.02
= 88.15 x 0.12 x 1.00 = 10.58
23 Pek. Plat Tangga Beton t=15cm, K.250 Panjang x Lebar x Tinggi x Jumlah 2.23 m3
= 9.90 1.50 0.15 1.00 = 2.23
24 Pek. Listplank Beton t=7cm, K.250 Panjang x Lebar x Tinggi x Jumlah 7.31 m3
= 174.00 0.60 0.07 1.00 = 7.31
IV PEKERJAAN KAYU
1 Pek. Kusen Kayu, Klas I Luas x Lebar x Jumlah 4.90 m3
P1 = 0.492 0.13 19.00 = 1.22
P2 = 0.385 0.13 4.00 = 0.20
P5 = 0.240 0.13 8.00 = 0.25
J2 = 0.548 0.13 18.00 = 1.28
J3 = 0.403 0.13 2.00 = 0.10
J4 = 0.675 0.13 4.00 = 0.35
J5 = 0.290 0.13 24.00 = 0.90
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
5 Pek. Daun Jendela Kaca 5mm + Ventilasi, Klas II Luas x Jumlah 70.88 m2
P1 = 0.853 x 19.00 = 16.20
P2 = 0.440 x 4.00 = 1.76
J2 = 2.940 x 18.00 = 52.92
=
VI PEKERJAAN PENGECATAN
1 Pek. Cat Kayu Panjang x Tinggi x Jumlah 336.89 m2
P.1 = 10.15 x 0.36 x 19.00 = 69.43
P.2 = 7.90 x 0.36 x 4.00 = 11.38
2 Pek. Plesteran Dinding Bata, Camp.1PC:5PS Volume Pas. Dinding x 2.00 = 1,058.68 1,058.68 m2
II PEKERJAAN LANTAI
1 Pek. Pas. Lantai Keramik 60x60cm Panjang x Lebar x Jumlah 207.08 m2
= 6.00 x 6.35 x 2.00 = 76.20
= 6.00 x 6.35 x 3.00 = 114.30
= 6.50 x 2.55 x 2.00 x 0.50 = 16.58
4 Pek. Rangka Plafond Besi Hollow = Volume Pek. Plafond = 932.31 932.31 m2
2 Pek. Kolom Beton K.9 = 25x25cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.50 m3
= 0.25 0.25 2.00 4.00 = 0.50
3 Pek. Kolom Beton K.10 = 15x45cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.54 m3
= 0.15 0.45 2.00 4.00 = 0.54
4 Pek. Kolom Beton Praktis KP.2 = 15x30cm, K.250 Panjang x Lebar x Tinggi x Jumlah - m3
= 0.15 0.30 2.00 - = -
4 Pek. Kolom Beton Praktis KP.1 =13x13cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.51 m3
= 0.13 0.13 2.00 15.00 = 0.51
4 Pek. Kolom Beton K.8 = 30x30cm, K.250 Panjang x Lebar x Tinggi x Jumlah 1.08 m3
= 0.30 x 0.30 x 2.00 x 6.00 = 1.08
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
5 Pek. Ring Balok Beton R.1 = 35x50cm, K.250 Panjang x Lebar x Tinggi x Jumlah 35.89 m3
= 205.10 0.35 0.50 1.00 = 35.89
6 Pek. Balok Beton B.21 = 20x35cm, K.250 Panjang x Lebar x Tinggi x Jumlah 2.06 m3
= 29.40 0.20 0.35 1.00 = 2.06
7 Pek. Balok latei = 13x15 cm el. + 12.05 Panjang x Lebar x Tinggi x Jumlah 1.10 m3
= 3.95 0.13 0.15 9.00 = 0.69
= 3.55 0.13 0.15 2.00 = 0.14
= 4.55 0.13 0.15 3.00 = 0.27
IV PEKERJAAN KAYU
1 Pek. Kusen Kayu, Klas I Luas x Lebar x Jumlah 0.21 m3
P1 = 0.492 0.13 1.00 = 0.06
P2 = 0.385 0.13 3.00 = 0.15
14 Pek. Pengelasan =
Plat Dudukan/Landasan t = 16mm = P x L x T x N 4,707.60 kg
- KUDA-KUDA TYPE - A. (2 BUAH) = 10.00 1.45 2.00 2.00 = 58.00
- KUDA-KUDA TYPE - B. (5 BUAH) = 10.00 1.45 2.00 5.00 = 145.00
- 1/2 KUDA-KUDA TYPE - D. (2 BUAH) = 10.00 1.45 1.00 2.00 = 29.00
- KUDA-KUDA TRAPESIUM TYPE - C. = 10.00 1.45 2.00 2.00 = 58.00
- 1/4 KUDA-KUDA TYPE - E. (3 BUAH) = 10.00 1.45 1.00 3.00 = 43.50
- JURAI TYPE - F. (3 BUAH) = 10.00 1.45 1.00 3.00 = 43.50
- KUDA-KUDA TYPE - G. (1 BUAH) = 10.00 1.45 2.00 1.00 = 29.00
- KUDA-KUDA TIPE -H (3 BUAH) = 10.00 1.45 2.00 3.00 = 87.00
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
- KUDA-KUDA TIPE -H '(1 BUAH) = 10.00 1.45 1.00 1.00 = 14.50
- 1/2 KUDA-KUDA TYPE - J. (1 BUAH) = 10.00 1.45 1.00 1.00 = 14.50
- KUDA-KUDA TRAPESIUM TYPE - I. = 10.00 1.45 2.00 1.00 = 29.00
- 1/4 KUDA-KUDA TYPE - K. (2 BUAH) = 10.00 1.45 1.00 2.00 = 29.00
- JURAI TYPE - L. (2 BUAH) = 10.00 1.45 1.00 2.00 = 29.00
2 Pek. Galian Tanah Pondasi Batu Kali Panjang x Lebar x Tinggi x Jumlah 22.65 m3
1.35 0.70 0.80 6.00 = 4.54
2.10 0.70 0.80 4.00 = 4.70
15.40 0.70 0.80 1.00 = 8.62
8.55 0.70 0.80 1.00 = 4.79
4 Pek. Urugan Pasir Bawah Pondasi Footplat Panjang x Lebar x Tinggi x Jumlah 0.80 m3
= 1.00 1.00 0.10 8.00 = 0.80
5 Pek. Urugan Pasir Bawah Pondasi Batu Kali Panjang x Lebar x Tinggi x Jumlah 2.83 m3
= 1.35 0.70 0.10 6.00 = 0.57
= 2.10 0.70 0.10 4.00 = 0.59
= 15.40 0.70 0.10 1.00 = 1.08
= 8.55 0.70 0.10 1.00 = 0.60
II PEKERJAAN PASANGAN DAN PLESTERAN
1 Pek. Batu Kosong Panjang x Lebar x Tinggi
= 40.45 x 0.70 x 0.20 = 5.66 5.66 m3
4 Pek. Plesteran Dinding Bata, Camp.1PC:5PS = Volume Pas. Dinding Bata x 2.00 = 191.67 191.67 m2
5 Pek. Plesteran Kolom Beton Dan Gapura, Camp.1PC:5PS Lebar x Tinggi x Jumlah 95.76 m2
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
1.20 2.70 4.00 = 12.96
0.50 2.70 8.00 = 10.80
1.50 12.00 4.00 = 72.00
2 Pek. Pondasi Footplat =1,00x1,00m', K.250 Panjang x Lebar x Tinggi x Jumlah 3.20 m3
= 1.00 1.00 0.40 8.00 = 3.20
3 Pek. Sloof Beton =15x25cm, K.250 Panjang x Lebar x Tinggi x Jumlah 1.52 m3
= 40.45 0.15 0.25 1.00 = 1.52
4 Pek. Kolom Beton K.1 = 15x25cm', K.250 Panjang x Lebar x Tinggi x Jumlah Jumlah 1.43 m3
= 0.15 0.25 4.75 8.00 = 1.43
5 Pek. Kolom Beton K.2 = 20x40cm', K.250 Panjang x Lebar x Tinggi x Jumlah 0.91 m3
= 0.20 0.40 2.85 4.00 = 0.91
6 Pek. Kolom Beton K.3 = 15x25cm', K.250 Panjang x Lebar x Tinggi x Jumlah 0.74 m3
= 0.25 0.15 4.90 4.00 = 0.74
7 Pek. Kolom Beton KP = 13x13cm', K.250 Panjang x Lebar x Tinggi x Jumlah 0.38 m3
= 0.13 0.13 3.25 7.00 = 0.38
8 Pek. Kolom Beton KP.1 = 9x15cm', K.250 Panjang x Lebar x Tinggi x Jumlah 0.35 m3
= 0.09 0.15 3.25 8.00 = 0.35
9 Pek. Balok Beton = 15x25cm, K.250 Panjang x Lebar x Tinggi x Jumlah 1.52 m3
= 40.45 0.15 0.25 1.00 = 1.52
4 Pek. Letter Set Stainlessteel uk.17cm' t=5cm'(Type Arial Bold) = 47.00 47.00 bh
5 Pek. Letter Set Stainlessteel uk.25cm' t=5cm'(Type Arial Bold) = 4.00 4.00 bh
6 Pek. Pagar Stainlessteel dia.3" dan 4x4cm' = 3.50 x 1.73 x 2.00 = 12.11 13.67 m2
= 0.45 x 1.73 x 2.00 = 1.56
V PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Tembok = Volume Pek. Acian = 287.43 287.43 m2
2 Pek. Galian Tanah Pondasi Batu Kali Panjang x Lebar x Tinggi x Jumlah 59.98 m3
= 35.70 0.70 0.80 3.00 = 59.98
4 Pek. Urugan Pasir Bawah Pondasi Footplat Panjang x Lebar x Tinggi x Jumlah 1.30 m3
= 1.20 3.60 0.10 3.00 = 1.30
5 Pek. Urugan Pasir Bawah Pondasi Batu Kali Panjang x Lebar x Tinggi x Jumlah 7.50 m3
= 35.70 0.70 0.10 3.00 = 7.50
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
II. PEKERJAAN PASANGAN DAN PLESTERAN
1 Pek. Batu Kosong Panjang x Lebar x Tinggi x Jumlah
= 35.70 0.70 0.20 3.00 = 14.99 14.99 m3
2 Pek. Pas. Pondasi Batu Kali, Camp.1PC:5PS Panjang x Lebar x Tinggi x Jumlah
= 35.70 0.40 0.55 3.00 = 23.56 23.56 m3
4 Pek. Plesteran Dinding Bata, Camp.1PC:5PS = Volume Pas. Dinding Bata x 2.00 = 625.14 625.14 m2
IV PEKERJAAN BETON
1 Pek. Lantai Kerja t=10cm, K.100 Panjang x Lebar x Tinggi x Jumlah 1.30 m3
= 1.20 3.60 0.10 3.00 = 1.30
2 Pek. Pondasi Footplat =1,00x3,40m', K.250 Panjang x Lebar x Tinggi x Jumlah 3.57 m3
= 1.00 3.40 0.35 3.00 = 3.57
3 Pek. Sloof Beton =15x25cm, K.250 Panjang x Lebar x Tinggi x Jumlah 4.66 m3
= 41.40 0.15 0.25 3.00 = 4.66
4 Pek. Kolom Beton Gerbang = 30x80cm', K.250 Panjang x Lebar x Tinggi x Jumlah 4.68 m3
= 0.30 0.80 6.50 3.00 = 4.68
5 Pek. Kolom Beton Gerbang = 30x50cm', K.250 Panjang x Lebar x Tinggi x Jumlah 5.85 m3
= 0.30 0.50 6.50 6.00 = 5.85
6 Pek. Kolom Beton Gerbang = 25x45cm', K.250 Panjang x Lebar x Tinggi x Jumlah 2.53 m3
= 0.45 0.25 3.75 6.00 = 2.53
7 Pek. Kolom Beton K.1 = 15x25cm', K.250 Panjang x Lebar x Tinggi x Jumlah 1.42 m3
= 0.15 0.25 3.15 12.00 = 1.42
8 Pek. Kolom Beton KP = 13x13cm', K.250 Panjang x Lebar x Tinggi x Jumlah 0.80 m3
= 0.13 0.13 3.15 15.00 = 0.80
9 Pek. Balok Beton = 15x25cm, K.250 Panjang x Lebar x Tinggi x Jumlah 1.00 m3
= 8.90 0.15 0.25 3.00 = 1.00
10 Pek. Balok Latei Beton = 13x15cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.33 m3
= 5.60 0.13 0.15 3.00 = 0.33
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
11 Pek. Plat Dak Pos Jaga t=10cm, K.250 Panjang x Lebar x Tinggi x Jumlah 1.94 m3
= 2.40 2.70 0.10 2.00 = 1.30
= 2.40 2.70 0.10 1.00 = 0.65
12 Pek. Plat Sunscreen t=7cm, K.250 Panjang x Lebar x Tinggi x Jumlah 0.66 m3
= 6.95 0.45 0.07 3.00 = 0.66
2 Pek. Tiang Pipa Pintu Gerbang Stainlessteel dia.4" = 30.00 30.00 m'
4 Pek. Daun Pintu Kaca Aluminium = 0.80 x 2.00 3.00 = 4.80 4.80 m2
5 Pek. Daun Pintu Aluminium KM/WC = 0.70 x 2.00 3.00 = 4.20 4.20 m2
3 Pek. Urugan Pasir Bawah Pondasi Batu Kali Panjang x Lebar x Tinggi 30.30 m3
= 52.60 x 0.70 x 0.10 = 11.05
= 5.60 x 0.70 x 0.10 = 1.18
= 86.10 x 0.70 x 0.10 = 18.08
2 Pek. Pas. Pondasi Batu Kali, Camp.1PC:5PS = 118.40 x 0.50 x 0.75 x 1.00 = 44.40 60.59 m3
= 25.90 x 0.50 x 1.25 x 1.00 = 16.19
3 Pek. Pas. Dinding Bata 1/2Bt. Camp.1PC:5PS = 144.30 x x 1.00 x 1.00 = 144.30 144.30 m2
4 Pek. Plesteran Dinding Bata, Camp.1PC:5PS = Volume Pas. Dinding bata x 2.00 = 288.60 288.60 m2
5 Pek. Plesteran Kolom Beton Dan Gapura, Camp.1P = 1.20 x 2.70 x 41.00 = 132.84 132.84 m2
2 Pek. Kolom Beton K.2 = 20x40cm', Panjang x Lebar x Tinggi x Jumlah 9.35 m3
= 2.85 x 0.20 x 0.40 x 41.00 = 9.35
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
V. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Tembok = Volume Pek. Acian = 421.44 421.44 m2
3 Pek. Urugan Pasir Bawah Pondasi Batu Kali Panjang x Lebar x Tinggi 8.16 m3
= 116.60 x 0.70 x 0.10 = 8.16
2 Pek. Pas. Pondasi Batu Kali, Camp.1PC:5PS = 116.60 x 0.50 x 0.80 = 46.64 46.64 m3
3 Pek. Pas. Dinding Bata 1/2Bt. Camp.1PC:5PS = 116.60 x x 2.70 = 314.82 314.82 m2
4 Pek. Plesteran Dinding Bata, Camp.1PC:5PS = Volume Pas. Dinding bata x 2.00 = 629.64 629.64 m2
5 Pek. Plesteran Kolom Beton Dan Gapura, Camp.1P = 1.20 x 2.70 x 32.00 = 103.68 103.68 m2
2 Pek. Kolom Beton K.2 = 20x40cm', K.250 Panjang x Lebar x Tinggi x Jumlah 7.30 m3
= 2.85 x 0.20 x 0.40 x 32.00 = 7.30
3 Pek. Ring Balok Beton = 13x15cm', K.250 Panjang x Lebar x Tinggi 2.27 m3
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
= 116.60 x 0.13 x 0.15 = 2.27
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
6 Pek. Pas. Pondasi Batu Kali, Camp.1PC:5PS (ramp = Panjang x Tinggi x Lebar x jumlah 49.85 m3
= 6.60 1.50 0.55 2.00 = 10.89
= 7.00 1.20 0.55 2.00 = 9.24
pas batu penahan tanaha = 3.73 0.50 0.30 10.00 = 5.60
= 4.58 0.50 0.30 8.00 = 5.50
pas.batu di area gwt = 11.30 1.50 0.50 2.00 = 16.95
pas.batu dibawah tangga = 8.00 0.70 0.30 = 1.68
7 Pek. Pas. Dinding Bata 1/2Bt (taman) = Panjang x Tinggi x jumlah 358.61 m2
taman di area gwt = 11.20 1.00 2.00 = 22.40
= 16.07 0.80 2.00 = 25.71
taman depan = 37.76 2.50 1.00 = 94.40
taman belakang = 99.08 1.20 1.00 = 118.90
taman belakang pinggir dinding = 108.00 0.90 1.00 = 97.20
PEKERJAAN TAMBAHAN
I Pekerjaan Waterprofing
Waterprofing Lantai 1 Panjang x Lebar 53.44 m2
area kamar mandi = 2.85 x 7.03 = 20.04
= 16.91 x 0.10 = 1.69
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
= 2.85 x 5.87 = 16.73
= 14.59 x 0.10 = 1.46
tempat wudhu = 1.00 x 3.50 = 3.50
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
KPA Bid. Cipta Karya Pejabat Pelaksana Pengawas Utama Bid. Cipta Karya Konsultan Pengawas
DPU Kab. Lombok Timur Teknis Kegiatan (PPTK) DPU Kab. Lombok Timur CV. Danasady Consultant
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4 5
Hj. Kartini, ST., MH Hafid Wahyu Widodo, ST Ali Fikri, ST Muhamad Sapardi, ST
NIP. 19631231 1991022 015 NIP. 19771003 201001 1 007 NIP. 19770202 200604 1 013 Team Leader
K UP VOLUME PEKERJAAN
KETERANGAN
5
6.6
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
13.6
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
-
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
32.37
537.34
0.5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
KETERANGAN
5
Kontraktor Pelaksana
PT. Damai Indah Utama
KETERANGAN
5
S. Ali Asgar, ST
Project Manager