OPNAME PEKERJAAN BORONGAN

MANDOR : PAK NGATMAN

VOLUME
NO URAIAN PEKERJAAN SATUAN KONTRAK

1 Besi Ulir kg

2 Beton K-225 (Ready Mix) Lantai m3

3 Beton K-225 (Ready Mix) Dinding m3

4 Beton K-225 (Ready Mix) Balok Koperan Kantong Lumpur m3

5 Beton decking Pcs

6 Bekisting Pcs

7 Galian Koperan m3

8 Pemasangan Precast Koperan Pcs


PNAME PEKERJAAN BORONGAN

QUANTITY

MINGGU LALU MINGGU INI KOMULATIF

- 19,485.59 19,485.59

- 266.64 266.64

- 9.40 9.40

- 2.96 2.96

- 160.00 160.00

- 24.00 24.00

- 6.93 6.93

- 8.00 8.00
BACKUP PERHITUNGAN VOLUME BESI TULANGAN

Mandor : Ngatman
Area Kerja : Kantong Lumpur

TULANGAN KANTONG LUMPUR SECSION 1

No.
Segmen

Kode f Jarak Ukuran Panjang Jumlah Berat Berat


Tul Tul Tul a b c Pot Pot /m Total
(mm) (cm) (m) (m) (m) (m) (kg) (kg)
13 20 9.00 9.00 396.00 1.04 3,706.56
13 20 12.00 12.00 400.00 1.04 4,992.00
13 20 10.00 10.00 32.00 1.04 332.80
13 20 1.43 1.43 48.00 1.04 71.39
13 20 1.82 1.82 96.00 1.04 181.71
13 20 1.00 1.00 324.00 1.04 336.96
Total Vol

TULANGAN KANTONG LUMPUR SECSION 2

No.
Segmen

Kode f Jarak Ukuran Panjang Jumlah Berat Berat


Tul Tul Tul a b c Pot Pot /m Total
(mm) (cm) (m) (m) (m) (m) (kg) (kg)
13 20 9.00 9.00 396.00 1.04 3,706.56
13 20 12.00 12.00 410.00 1.04 5,116.80
13 20 10.00 10.00 32.00 1.04 332.80
13 20 1.43 1.43 54.00 1.04 80.31
13 20 1.82 1.82 108.00 1.04 204.42
13 20 1.00 1.00 324.00 1.04 336.96
13 20 2.30 2.30 30.00 1.04 71.76
13 20 2.00 2.00 7.00 1.04 14.56
Total Vol
Total Volume Besi Tulangan Kantor Lumpur terpa
UME BESI TULANGAN

MPUR SECSION 1

Jumlah
Volume
Segmen

1.00 3,706.56
1.00 4,992.00
1.00 332.80
1.00 71.39
1.00 181.71
1.00 336.96
Total Volume 9,621

MPUR SECSION 2

Jumlah
Volume
Segmen

m btg
1.00 3,706.56 3,564.00
1.00 5,116.80 4,920.00
1.00 332.80 320.00
1.00 80.31 77.22
1.00 204.42 196.56
1.00 336.96 324.00
1.00 71.76 69.00
1.00 14.56 14.00
Total Volume 9,864 9,484.78 790.40
al Volume Besi Tulangan Kantor Lumpur terpasang 19,485.59
TULANGAN KANTONG LUMPUR SECSION 1

Kode f Ukuran Panjang Jumlah Jumlah


Tul Tul a b c Pot Pot panjang
(mm) (m) (m) (m) (m) (kg)
UK 9m 13 9.00 9.00 396.00 3,564.00

UK 12 m 13 12.00 12.00 400.00 4,800.00

Uk 10 m 13 10.00 10.00 32.00 320.00

UK 1.43 13 1.43 1.43 48.00 68.64

UK 1.82 13 1.82 1.82 96.00 174.72

UK 1 m 13 1.00 1.00 324.00 324.00

Total Panjang 9,251.36

Jumlah Batang 770.95

TULANGAN KANTONG LUMPUR SECSION 2

Kode f Ukuran Panjang Jumlah Berat


Tul Tul a b c Pot Pot Total
(mm) (m) (m) (m) (m) (kg)
UK 9 13 9.00 9.00 396.00 3,564.00

UK 12 13 12.00 12.00 410.00 4,920.00

UK 10 13 10.00 10.00 32.00 320.00

UK 1.43 13 1.43 1.43 54.00 77.22

UK 1.82 13 1.82 1.82 108.00 196.56

UK 1 13 1.00 1.00 324.00 324.00

Begel Uk 230 13 2.30 2.30 30.00 69.00

Over Lep 13 2.00 2.00 7.00 14.00


Total Panjang 9,484.78
Jumlah Batang 790.40

Jumlah Total Batang 1,561.35


Berat per batang esi 13 mm 12.48
Total berat besi 19,486
OPNAME PEKERJAAN BORONGAN

MANDOR : JUMARNO

PERIODE : 22 Juli 2018 s/d 2 Agustus 2018

QUANTITY
NO URAIAN PEKERJAAN SATUAN VOLUME
KONTRAK
MINGGU LALU MINGGU INI

1 Besi Ulir D16 Bored pile f 40 cm m2 14,409.60

2 Besi Ulir D13 Bored pile f 40 cm m2 4,268.16

3 Perapihan tanah saluran Mengker m2 205.60

4 Pekerjaan Pasangan Batu kali saluran Mengker m2 58.96

5 Pekerjaan Siaran saluran Mengker m2 178.40


ME PEKERJAAN BORONGAN

QUANTITY
HARGA JUMLAH
SATUAN HARGA (Rp)
KOMULATIF

14,409.60 1,400.00 20,173,440.00

4,268.16 1,400.00 5,975,424.00

205.60 3,000.00 616,800.00

58.96 125,000.00 7,370,000.00

178.40 10,000.00 1,784,000.00

Jumlah 35,919,664.00
BACKUP PERHITUNGAN VOLUME PEKERJAAN

MANDOR : JUMARNO

TULANGAN BORED PILE f 40 CM

Jumlah
No.
Segmen

Kode f Jarak Ukuran Panjang Jumlah Berat Berat


Tul Tul Tul a b c Pot Pot /m Total
(mm) (cm) (m) (m) (m) (m) (kg) (kg)
16 12.00 12.00 10.00 1.58 189.60 57.00
16 4.00 4.00 10.00 1.58 63.20 57.00
13 30 12.00 12.00 6.00 1.04 74.88 57.00
Total Volume

PEKERJAAN REHABILITASI SALURAN MENGKER

No Uraian Pekerjaan
I Perapihan dan Perataan Tanah
a Dinding Saluran
Kiri Volume Sat Kanan Volume
1 3.60 x 3.20 = 11.52
2 3.60 x 3.20 = 11.52
3 3.60 x 3.10 = 11.16 3.60 x 3.30 = 11.88
4 3.60 x 3.00 = 10.80 3.60 x 3.30 = 11.88
5 3.60 x 3.00 = 10.80 3.60 x 3.30 = 11.88
6 3.60 x 3.00 = 10.80 3.60 x 3.30 = 11.88
7 3.60 x 3.00 = 10.80 3.60 x 3.30 = 11.88
8 3.60 x 3.10 = 11.16 3.60 x 3.30 = 11.88
9 2.90 x 3.20 = 9.28 2.90 x 3.20 = 9.28
74.80 103.60
b Lantai
1.00 x 27.20 = 27.20
Total Volum

PEKERJAAN REHABILITASI SALURAN MENGKER

No Uraian Pekerjaan

II Pasangan Batu Kali


a Dinding Saluran
Kiri Volume Kanan
1 3.60 x 3.20 x
2 3.60 x 3.20 x
3 3.60 x 3.10 x 0.30 = 3.35 3.60 x 3.30 x
4 3.60 x 3.00 x 0.30 = 3.24 3.60 x 3.30 x
5 3.60 x 3.00 x 0.30 = 3.24 3.60 x 3.30 x
6 3.60 x 3.00 x 0.30 = 3.24 3.60 x 3.30 x
7 3.60 x 3.00 x 0.30 = 3.24 3.60 x 3.30 x
8 3.60 x 3.10 x 0.30 = 3.35 3.60 x 3.30 x
9 2.90 x 3.20 x 0.30 = 2.78 2.90 x 3.20 x
22.44
b Lantai
1.00 x 27.20 x 0.20 = 5.44

PEKERJAAN REHABILITASI SALURAN MENGKER

No Uraian Pekerjaan

III Pekerjaan Siaran


a Dinding Saluran
Kiri Volume Sat Kanan Volume
1 3.60 x 3.20 = 11.52
2 3.60 x 3.20 = 11.52
3 3.60 x 3.10 = 11.16 3.60 x 3.30 = 11.88
4 3.60 x 3.00 = 10.80 3.60 x 3.30 = 11.88
5 3.60 x 3.00 = 10.80 3.60 x 3.30 = 11.88
6 3.60 x 3.00 = 10.80 3.60 x 3.30 = 11.88
7 3.60 x 3.00 = 10.80 3.60 x 3.30 = 11.88
8 3.60 x 3.10 = 11.16 3.60 x 3.30 = 11.88
9 2.90 x 3.20 = 9.28 2.90 x 3.20 = 9.28
74.80 103.60
Total Volum
RHITUNGAN VOLUME PEKERJAAN

BORED PILE f 40 CM

Volume

10,807.20
3,602.40
4,268.16
18,677.76

HABILITASI SALURAN MENGKER

Uraian Pekerjaan Volume

Sat

Total Volume 205.60

REHABILITASI SALURAN MENGKER

Uraian Pekerjaan
Kanan Volume
0.30 = 3.46
0.30 = 3.46
0.30 = 3.56
0.30 = 3.56
0.30 = 3.56
0.30 = 3.56
0.30 = 3.56
0.30 = 3.56
0.30 = 2.78
31.08

Total Volume 58.96

HABILITASI SALURAN MENGKER

Uraian Pekerjaan Volume

Sat

Total Volume 178.40


OPNAME PEKERJAAN BORONGAN

MANDOR : MARSUDI

PERIODE :

REKAPITULASI PEKERJAAN SIPIL

QUANTIT
NO URAIAN PEKERJAAN SATUAN VOLUME
KONTRAK
MINGGU LALU

1 Pasangan Batu kali saluran Induk Mengker m2

(Include Dewatering, Perataan tanah, Plesteran, Acian dan Siaran) m2

2 Pasangan batu kali saluran gendong Mengker m2

(Include Perataan tanah, Plesteran, Acian dan Siaran) m2

REKAPITULASI PENGGUNAAN MATERIAL

NO JENIS MATERIAL SATUAN VOLUME HARGA SATUAN


(Rp)
1 Semen PC zak 324 45,500.00
QUANTIT
NO URAIAN PEKERJAAN SATUAN VOLUME
KONTRAK
MINGGU LALU

Jumlah Total

REKAPITULASI
OPNAME PEKERJAAN
PENGGUNAAN MATERIAL
JUMLAH

disetujui diketahui, diperiksa

Ir. HERY MARDIONO BERNARDUS ULITZSCH M. SOLIKHIN


Project Manager Pelaksana Teknik Dept.
NAME PEKERJAAN BORONGAN

QUANTITY
HARGA JUMLAH
SATUAN HARGA
MINGGU INI KOMULATIF

38.88 38.88 525,000.00 20,412,000.00

183.40 183.40 500,000.00 91,700,000.00

Jumlah 112,112,000.00

JUMLAH HARGA
(Rp)
14,742,000.00
QUANTITY
HARGA JUMLAH
SATUAN HARGA
MINGGU INI KOMULATIF

14,742,000.00

112,112,000.00
14,742,000.00
97,370,000.00

Bogor, …………………………………..
diajukan

MARSUDI
Mandor
OPNAME PEKERJAAN BORONGAN

MANDOR : PAK MARSUDI

VOLUME
NO URAIAN PEKERJAAN SATUAN QUA
KONTRAK
MINGGU LALU

1 Pasangan Batu Kali Saluran Induk Mengker m3 -

(0.3 m x 3.6 m x 12 segmen) -

Pas. Batu Kali

POTONGAN MELINTANG SALURAN

FRAME BETON BERTULANG K-225

PASANGAN BATU KALI

360 360

POTONGAN MEMANJANG SALURAN INDUK


s k a l a 1 : 50

2 Pasangan Batu Kali Saluran Gendong m3

( Include Plesteran, Siaran, Perapihan tanah, dewatering)

30 50 30
70
130

A B A
30

50 50 50

POTONGAN MELINTANG SALURAN GENDONG


Panjang Saluran = 140 m
Luas Penampang saluran

Luas A = ((0.5 x 1.3)-(0.5 x 0.2 x 0.7)) X 2

Luas B = 0.5 x 0.3

Luas A dan B = 1.31 m2


PEKERJAAN BORONGAN

QUANTITY

MINGGU INI KOMULATIF

38.88 38.88

183.40 183.40
OPNAME PEKERJAAN BORONGAN

MANDOR : ROFIK

PERIODE : 22 Juli 2018 s/d 2 Agustus 2018

QUANTITY
NO URAIAN PEKERJAAN SATUAN VOLUME
KONTRAK
S/D MINGGU
LALU

1 Perataan Tanah Kantong Lumpur m2

2 Perataan Tanah Area Steel Fabrication m2

3 Bekisting Precast Frame Saluran Induk Mengker Type 1 m2

4 Bekisting Precast Frame Saluran Induk Mengker Type 2 m2

5 Bekisting Precast Frame Saluran Induk Mengker Type 3 m2

6 Besi Ulir D13 (Precast Frame Pas. Batu Sal. Mengker Type 1) kg

7 Besi Ulir D13 (Precast Frame Pas. Batu Sal. Mengker Type 2) kg

8 Besi Ulir D13 (Precast Frame Pas. Batu Sal. Mengker Type 3) kg

7 Besi Ulir D13 (Precast Balok Koperan Kantong Lumpur) kg

9 Besi Polos P10 (Precast Frame Pas. Batu Sal. Mengker Type 1) kg

10 Besi Polos P10 (Precast Frame Pas. Batu Sal. Mengker Type 2) kg
QUANTITY
NO URAIAN PEKERJAAN SATUAN VOLUME
KONTRAK
S/D MINGGU
LALU

11 Besi Polos P10 (Precast Frame Pas. Batu Sal. Mengker Type 3) kg

12 Pengecoran Precast Frame Saluran Induk Mengker Type 1 m3

13 Pengecoran Precast Frame Saluran Induk Mengker Type 2 m3

14 Pengecoran Precast Frame Saluran Induk Mengker Type 3 m3

15 Pengecoran Balok Precast Koperan Kantong Lumpur m3

16 Pengecoran Lantai Kerja Kantong Lumpur m2

17 Pengecoran Lantai Kerja Area Steel Fabrikasi m2

18 Stop Cor Lantai Kerja m1

19 Finishing Lantai Sambungan Container Saluran Pengelak Mengker m1

20 Pemasangan Bekisting sambungan Container Saluran Pengelak Mengker m1

21 Perapihan tanah saluran Mengker m2

22 Pasangan batu kali m3

23 Pemasangan Precast Frame Saluran Induk Mengker Type 1 m3

24 Pemasangan Precast Frame Saluran Induk Mengker Type 2 m3

25 Pemasangan Precast Frame Saluran Induk Mengker Type 3 m3


QUANTITY
NO URAIAN PEKERJAAN SATUAN VOLUME
KONTRAK
S/D MINGGU
LALU

26 Pasangan batu Bronjong m2


AME PEKERJAAN BORONGAN

QUANTITY
HARGA JUMLAH
SATUAN HARGA
MINGGU INI KOMULATIF

1,662.50 1,662.50 3,000.00 4,987,500.00

200.00 200.00 3,000.00 600,000.00

20.26 20.26 25,000.00 506,500.00

14.31 14.31 25,000.00 357,750.00

19.53 19.53 25,000.00 488,312.50

1,482.62 1,482.62 1,400.00 2,075,673.60

561.60 561.60 1,400.00 786,240.00

473.93 473.93 1,400.00 663,499.20

402.11 402.11 1,400.00 562,947.84

456.09 456.09 1,400.00 638,520.96

248.77 248.77 1,400.00 348,284.16


QUANTITY
HARGA JUMLAH
SATUAN HARGA
MINGGU INI KOMULATIF

449.18 449.18 1,400.00 628,846.40

12.28 12.28 75,000.00 920,700.00

4.32 4.32 75,000.00 324,000.00

7.01 7.01 75,000.00 526,050.00

4.01 4.01 75,000.00 300,600.00

1,662.50 1,662.50 10,000.00 16,625,000.00

200.00 200.00 10,000.00 2,000,000.00

609.00 609.00 -

40.00 40.00 -

84.00 84.00 -

344.28 344.28 3,000.00 1,032,840.00

103.28 103.28 125,000.00 12,910,500.00

2.68 2.68 25,000.00 66,900.00

2.48 2.48 25,000.00 61,875.00

5.35 5.35 25,000.00 133,800.00


QUANTITY
HARGA JUMLAH
SATUAN HARGA
MINGGU INI KOMULATIF

28.00 28.00 60,000.00 1,680,000.00

- -

Jumlah 49,226,339.66
TULANGAN PRECAST BALOK FRAME PASANGAN BATU SALURAN M

No.
Segmen

Kode f Jarak Ukuran

Tul Tul Tul a b c

(mm) (cm) (m) (m) (m)


Precast Type 1
13 3.60
10 0.05 0.10 0.20 0.10 0.20 0.05

Precast Type 2
13 2.50
10 0.05 0.10 0.20 0.10 0.20 0.05

Precast Type 3
13 2.17
10 0.05 0.10 0.50 0.10 0.50 0.05

TULANGAN PRECAST BALOK KOPERAN KANTONG LUMPUR

No.
Segmen

Kode f Jarak Ukuran

Tul Tul Tul a b c

(mm) (cm) (m) (m) (m)


13 2.67
13 0.05 0.40 0.90 0.40 0.90 0.05

Total Volume Besi Pre

PEKERJAAN REHABILITASI SALURAN MENGKER

No Uraian Pekerjaan
I Perapihan dan Perataan Tanah
a Dinding Saluran
Kiri Volume Sat Kanan
1 3.40 x 3.00 = 10.20
2 3.40 x 3.10 = 10.54
3 3.40 x 3.10 = 10.54
4 3.40 x 3.20 = 10.88
5 3.40 x 3.10 = 10.54
6 3.50 x 3.00 = 10.50
7 3.50 x 3.00 = 10.50
8 3.50 x 3.00 = 10.50
9 3.40 x 3.00 = 10.20
10 3.40 x 3.10 = 10.54 3.40 x 3.00
11 3.50 x 3.10 = 10.85 3.50 x 3.00
12 3.40 x 3.00 = 10.20 3.40 x 3.00
13 3.50 x 3.00 = 10.50 3.40 x 3.00
14 3.40 x 2.90 = 9.86 3.50 x 3.20
15 3.60 x 2.90 = 10.44 3.30 x 3.20
16 3.30 x 3.00 = 9.90 3.30 x 2.90
17 3.30 x 3.00 = 9.90 3.40 x 3.10
18 3.30 x 3.00 = 9.90 3.20 x 3.10
19 3.40 x 3.00 = 10.20 3.60 x 3.20
20 3.40 x 3.10 = 10.54 3.60 x 3.20
21 3.30 x 3.20 = 10.56 3.30 x 3.20
217.79

PEKERJAAN REHABILITASI SALURAN MENGKER

No Uraian Pekerjaan

II Pasangan Batu Kali


a Dinding Saluran
Kiri Volume Kanan
1 3.40 x 3.00 x 0.30 = 3.06
2 3.40 x 3.10 x 0.30 = 3.16
3 3.40 x 3.10 x 0.30 = 3.16
4 3.40 x 3.20 x 0.30 = 3.26
5 3.40 x 3.10 x 0.30 = 3.16
6 3.50 x 3.00 x 0.30 = 3.15
7 3.50 x 3.00 x 0.30 = 3.15
8 3.50 x 3.00 x 0.30 = 3.15
9 3.40 x 3.00 x 0.30 = 3.06
10 3.40 x 3.10 x 0.30 = 3.16 3.40 x
11 3.50 x 3.10 x 0.30 = 3.26 3.50 x
12 3.40 x 3.00 x 0.30 = 3.06 3.40 x
13 3.50 x 3.00 x 0.30 = 3.15 3.40 x
14 3.40 x 2.90 x 0.30 = 2.96 3.50 x
15 3.60 x 2.90 x 0.30 = 3.13 3.30 x
16 3.30 x 3.00 x 0.30 = 2.97 3.30 x
17 3.30 x 3.00 x 0.30 = 2.97 3.40 x
18 3.30 x 3.00 x 0.30 = 2.97 3.20 x
19 3.40 x 3.00 x 0.30 = 3.06 3.60 x
20 3.40 x 3.10 x 0.30 = 3.16 3.60 x
21 3.30 x 3.20 x 0.30 = 3.17 3.30 x
65.34

PEKERJAAN REHABILITASI SALURAN MENGKER

No Uraian Pekerjaan

III Pemasangan Balok Precast Frame Saluran


a Type 1
0.20 x 0.30 x 44.60

b Type 2
0.20 x 0.30 x( 2.80 + 2.70 )x 15.00
2.00
c Type 3
0.20 x 0.60 x 44.60
NGAN BATU SALURAN MENGKER

Jumlah
Volume
Segmen

Panjang Jumlah Berat Berat


Pot Pot /m Total
(m) (kg) (kg)

3.60 6.00 1.040 22.46 66.00 1,482.62


0.70 16.00 0.617 6.91 66.00 456.09

Total Volume 1,938.71

2.50 6.00 1.040 15.60 36.00 561.60


0.70 16.00 0.617 6.91 36.00 248.77

Total Volume 810.37

2.17 6.00 1.040 13.54 35.00 473.93


1.30 16.00 0.617 12.83 35.00 449.18

Total Volume 923.10


Total Volume Besi Precast 3,672.19

RAN KANTONG LUMPUR

Jumlah
Volume
Segmen

Panjang Jumlah Berat Berat


Pot Pot /m Total
(m) (kg) (kg)
2.67 9.00 1.040 24.99 8.00 199.93
2.70 9.00 1.040 25.27 8.00 202.18

Total Volume Besi Precast Balok Koperan Kantong Lumpur 402.11

ENGKER

Volume
anan Volume Sat

= 10.20
= 10.50
= 10.20
= 10.20
= 11.20
= 10.56
= 9.57
= 10.54
= 9.92
= 11.52
= 11.52
= 10.56
126.49
Total Volume 344.28

N MENGKER

Volume

Kanan Volume
3.00 x 0.30 = 3.06
3.00 x 0.30 = 3.15
3.00 x 0.30 = 3.06
3.00 x 0.30 = 3.06
3.20 x 0.30 = 3.36
3.20 x 0.30 = 3.17
2.90 x 0.30 = 2.87
3.10 x 0.30 = 3.16
3.10 x 0.30 = 2.98
3.20 x 0.30 = 3.46
3.20 x 0.30 = 3.46
3.20 x 0.30 = 3.17
37.95
Total Volume 103.28

ENGKER

Volume

= 2.68

= 2.48

= 5.35
Total Volume 10.50
OPNAME PEKERJAAN BORONGAN

MANDOR : ROFIK

PERIODE : 3 Agustus 2018 s/d

QUANTITY
NO URAIAN PEKERJAAN SATUAN VOLUME
KONTRAK
S/D MINGGU
LALU MINGGU INI

I Kantong Lumpur

1 Perataan Tanah kantong Lumpur Kiri m2 1,662.50 180.00

3 Pemasangan Stop Cor Lantai Kerja Kantong Lumpur m1 609.00 105.00

2 Pengecoran Lantai Kerja Kantong Lumpur m2 1,662.50 280.00

4 Pemasangan Bekisting dinding kantong lumpur m2 12.00

5 Pemasangan Beton Decking kantong lumpur pcs 300.00

6 Pemasangan Water Stop Kantong Lumpur m1 20.00

7 Pemasangan Blockout m1 9.00

8 Pemasangan Relat pengecoran kantong lumpur m1 126.00

9 Besi Ulir D13 Kantong Lumpur kg 9,726.08

10 Pengecoran Beton K-225 Lantai Kantong Lumpur m3 133.00


QUANTITY
NO URAIAN PEKERJAAN SATUAN VOLUME
KONTRAK
S/D MINGGU MINGGU INI
LALU

II Rehab Saluran Induk Mengker

1 Bekisting Precast Frame Saluran Induk Mengker Type 1 m2 20.26 81.04

2 Bekisting Precast Frame Saluran Induk Mengker Type 2 m2 14.31 57.24

5 Bekisting Precast Frame Saluran Induk Mengker Type 3 m2 19.53 149.70

6 Besi Ulir D13 (Precast Frame Pas. Batu Sal. Mengker Type 1) kg 1,482.62 1,228.03

7 Besi Ulir D13 (Precast Frame Pas. Batu Sal. Mengker Type 2) kg 561.60 823.68

8 Besi Ulir D13 (Precast Frame Pas. Batu Sal. Mengker Type 3) kg 473.93 2,043.72

9 Besi Polos P10 (Precast Frame Pas. Batu Sal. Mengker Type 1) kg 402.11 331.70

10 Besi Polos P10 (Precast Frame Pas. Batu Sal. Mengker Type 2) kg 456.09 228.04

11 Besi Polos P10 (Precast Frame Pas. Batu Sal. Mengker Type 3) kg 248.77 664.14

12 Pengecoran Precast Frame Saluran Induk Mengker Type 1 m3 12.28 8.18

13 Pengecoran Precast Frame Saluran Induk Mengker Type 2 m3 4.32 5.76

14 Pengecoran Precast Frame Saluran Induk Mengker Type 3 m3 7.01 18.44


QUANTITY
NO URAIAN PEKERJAAN SATUAN VOLUME
KONTRAK
S/D MINGGU MINGGU INI
LALU

disetujui diketahui, diperiksa

Ir. HERY MARDIONO Wilhelmus Gea M. SOLIKHIN


Project Manager Pelaksana Teknik Dept.
NAME PEKERJAAN BORONGAN

QUANTITY
HARGA JUMLAH
SATUAN HARGA
S/D MINGGU INI

1,842.50 3,000.00 540,000.00

714.00 1,000.00 105,000.00

1,942.50 10,000.00 2,800,000.00

12.00 25,000.00 300,000.00

300.00 -

20.00 -

9.00 -

126.00 -

9,726.08 1,400.00 13,616,512.00

133.00 75,000.00 9,975,000.00


QUANTITY
HARGA JUMLAH
SATUAN HARGA
S/D MINGGU INI

101.30 25,000.00 2,026,000.00

71.55 25,000.00 1,431,000.00

169.23 25,000.00 3,742,500.00

2,710.66 1,400.00 1,719,244.80

1,385.28 1,400.00 1,153,152.00

2,517.65 1,400.00 2,861,214.72

733.80 1,400.00 464,378.88

684.13 1,400.00 319,260.48

912.91 1,400.00 929,794.32

20.46 75,000.00 613,800.00

10.08 75,000.00 432,000.00

25.45 75,000.00 1,382,760.00


QUANTITY
HARGA JUMLAH
SATUAN HARGA
S/D MINGGU INI

Jumlah 44,411,617.20

Bogor, …………………………………..
diajukan

ROFIK
Mandor
TULANGAN PRECAST BALOK FRAME PASANGAN BATU SALURAN

No.
Segmen

Kode f Jarak Ukuran

Tul Tul Tul a b c

(mm) (cm) (m) (m) (m)


Precast Type 1
13 4.10
10 0.05 0.10 0.20 0.10 0.20 0.05

Ø 10 - 200 6 D 13
A
30

20 50 310
Pot a-a

Balok Precast
Type 1
Precast Type 2
13 3.00
10 0.05 0.10 0.20 0.10 0.20 0.05

B Ø 10 - 200 6D
30

20 50 200
Pot b-b

Balok Precast
Type 2

Precast Type 3
13 2.67
10 0.05 0.10 0.50 0.10 0.50 0.05
C
Ø 10 - 200 6 D 13

60

60
20 50 167 50

Pot c-c

Balok Precast
Type 3

PEKERJAAN REHABILITASI SALURAN MENGKER

No Uraian Pekerjaan

I Perapihan dan Perataan Tanah


a Dinding Saluran
Kiri Volume Sat Kanan
1 - x - = -
2 - x - = -
3 - x - = -
4 - x - = -
5 - x - = -
6 - x - = -
7 - x - = -
8 - x - = -
9 - x - = -
10 - x - = - - x -
11 - x - = - - x -
12 - x - = - - x -
13 - x - = - - x -
14 - x - = - - x -
15 - x - = - - x -
16 - x - = - - x -
17 - x - = - - x -
18 - x - = - - x -
19 - x - = - - x -
20 - x - = - - x -
21 - x - = - - x -
-

PEKERJAAN REHABILITASI SALURAN MENGKER

No Uraian Pekerjaan

II Pasangan Batu Kali


a Dinding Saluran
Kiri Volume Kanan
1 - x - x - = -
2 - x - x - = -
3 - x - x - = -
4 - x - x - = -
5 - x - x - = -
6 - x - x - = -
7 - x - x - = -
8 - x - x - = -
9 - x - x - = -
10 - x - x - = - - x
11 - x - x - = - - x
12 - x - x - = - - x
13 - x - x - = - - x
14 - x - x - = - - x
15 - x - x - = - - x
16 - x - x - = - - x
17 - x - x - = - - x
18 - x - x - = - - x
19 - x - x - = - - x
20 - x - x - = - - x
21 - x - x - = - - x
-

PEKERJAAN REHABILITASI SALURAN MENGKER

No Uraian Pekerjaan

III Pemasangan Balok Precast Frame Saluran


a Type 1
0.20 x 0.30 x -

b Type 2
0.20 x 0.30 x( 2.80 + 2.70 )x -
2.00
c Type 3
0.20 x 0.60 x -

BACKUP PERHITUNGAN VOLUME BESI TULANGAN

Mandor : Ropik
Area Kerja : Kantong Lumpur

TULANGAN KANTONG LUMPUR SECSION 3

No.
Segmen

Kode f Jarak Ukuran Panjang Jumlah Berat


Tul Tul Tul a b c Pot Pot /m
(mm) (cm) (m) (m) (m) (m) (kg)
13 20 12.00 12.00 456.00 1.04
13 20 9.00 9.00 400.00 1.04
13 20 1.80 1.80 108.00 1.04
13 20 1.40 1.40 54.00 1.04
13 20 1.00 1.00 10.00 1.04

PEKERJAAN REHABILITASI SALURAN MENGKER

No Uraian Pekerjaan

III Pemasangan Balok Precast Frame Saluran


a Type 1
0.20 x 0.30 x 3.10 x 44.00

Ø 10 - 200 6 D 13
A
30

20 50 310
Pot a-a

Balok Precast
Type 1

b Type 2
0.20 x 0.30 2.00 x 48.00

B Ø 10 - 200 6 D 13
30

20 50 200
Pot b-b

Balok Precast
Type 2

c Type 3
0.20 x 0.60 x 1.67 x 92.00

C
Ø 10 - 200 6 D 13
60

60

20 50 167 50

Pot c-c
60

60
20 50 167 50

Pot c-c

Balok Precast
Type 3
ANGAN BATU SALURAN MENGKER

Jumlah
Volume
Segmen

Panjang Jumlah Berat Berat


Pot Pot /m Total
(m) (kg) (kg)

4.10 6.00 1.040 25.58 48.00 1,228.03


0.70 16.00 0.617 6.91 48.00 331.70

Total Volume 1,559.73

6 D 13
30

310 50
ot a-a

3.00 6.00 1.040 18.72 44.00 823.68


0.70 12.00 0.617 5.18 44.00 228.04

Total Volume 1,051.72

200 6 D 13
30

200 50
ot b-b

2.67 8.00 1.040 22.21 92.00 2,043.72


1.30 9.00 0.617 7.22 92.00 664.14
Total Volume 2,707.86

6 D 13
60

50

Jumlah Besi f 10 1,223.88

Jumlah Besi f 13 4,095.44

MENGKER

Volume

anan Volume Sat

= -
= -
= -
= -
= -
= -
= -
= -
= -
= -
= -
= -
-
Total Volume -

AN MENGKER

an Volume

Kanan Volume

- x - = -
- x - = -
- x - = -
- x - = -
- x - = -
- x - = -
- x - = -
- x - = -
- x - = -
- x - = -
- x - = -
- x - = -
-
Total Volume -

MENGKER

Volume

= -

= -

= -

Total Volume -

LANGAN

Jumlah
Volume
Segmen

Berat
Total
(kg)
5,690.88 1.00 5,690.88
3,744.00 1.00 3,744.00
202.18 1.00 202.18
78.62 1.00 78.62
10.40 1.00 10.40

Total Volume 9,726.08

MENGKER

Volume

= 8.18
30

50

= 5.76

6 D 13
30

50

= 18.44

6 D 13
60

50
50 60

Total Volume 32.38


OPNAME PEKERJAAN BORONGAN

MANDOR : ANAM

PERIODE : 23 Juli 2018 s/d 6 Agustus 2018

REKAPITULASI PEKERJAAN SIPIL

QUANTITY
NO URAIAN PEKERJAAN SATUAN VOLUME
KONTRAK
S/D MINGGU
LALU

1 Pasangan Batu Bronjong buah

disetujui diketahui, diperiksa

Ir. HERY MARDIONO BERNARDUS ULITZSCH M. SOLIKHIN


Project Manager Pelaksana Teknik Dept.
NAME PEKERJAAN BORONGAN

QUANTITY
HARGA JUMLAH
SATUAN HARGA
MINGGU INI S/D MINGGU INI

165.00 165.00 60,000.00 9,900,000.00

Jumlah 9,900,000.00

Bogor, 06 Agustus 2018


diperiksa diajukan

M. SOLIKHIN ANAM
Teknik Dept. Mandor
LAMPIRAN DAFTAR KUANTITAS HASIL PERHITUNGAN BERSAMA MUTUAL CHEK AWAL ( MC. 0 %)
NAMA PEKERJAAN : PEMBANGUNAN BENDUNG CIPAMINGKIS KAB. BOGOR
LOKASI : KABUPATEN BOGOR
PELAKSANA : PT. SAC NUSANTARA - PT. TARUNA PUTRA PERTIWI, KSO
NOMOR : 03/BA-MC.0%/PPK-IRG.II/2018
TANGGAL : 02 MEI 2018
PEJABAT PEMBUAT KOMITMEN : IRIGASI DAN RAWA II
SATUAN KERJA : SNVT PELAKSANAAN JARINGAN PEMANFAATAN AIR CITARUM
TAHUN ANGGARAN : 2017-2019 (MYC)

HARGA VOLUME JUMLAH PROGRESS OF WORK QUANTITY


NO URAIAN PEKERJAAN SATUAN SAT PERUBAHAN HARGA PREVIOUS THIS UP
(Rp) (ADDENDUM-II) (Rp) PERIOD PERIOD TO DATE
1 2 3 4 5 6 7 8 9
BAB. I PEKERJAAN PERSIAPAN

A MOBILISASI / DEMOBILISASI

1 Mobilisasi/Demobilisasi 249,900,000.00 Ls 1.00 249,900,000.00

B DIVERSION CHANNEL

1 Galian Tanah Keras 32,180.00 m3 61,842.79 1,990,100,885.66

2 Pemindahan Tanah Hasil Galian dengan Dumptruck disekitar lokasi bendung 27,870.00 m3 61,842.79 1,723,558,473.69

3 Perapian pada Disposal Area/Tanggul 21,310.00 m3 61,842.79 1,317,869,790.97

4 Pemadatan Tanah Timbunan 8,800.00 m3 61,842.79 544,216,525.60

5 Urugan Kembali Hasil Galian 35,190.00 m3 49,474.21 1,740,997,449.90

C COFFERDAM SEMENTARA (HULU)

1 Timbunan tanah yang didatangkan dari luar dengan Jarak 10 km 286,820.00 m3 - -

2 Urugan Sirtu/Hasil Galian 35,190.00 m3 5,885.89 207,124,328.34

3 Pemadatan Tanah Timbunan 8,800.00 m3 - -

4 Pengaman Gerusan di hulu Cofferdam 82,500,000.00 Ls 1.00 82,500,000.00

5 Pemasangan Container 40 feet (Sewa) diisi tanah 26,750,400.00 unit 33.00 882,763,200.00

6 Bronjong 709,500.00 buah 1,478.00 1,048,641,000.00

7 Sewa steel sheet pile tebal 10 mm dan Pemancangan 827,610.00 m1 1,410.00 1,166,930,100.00

8 Pengadaan dan Pemasangan Geotextille Non Woven 14,310.00 m2 2,042.00 29,221,020.00

9 Bongkaran Container 40 Feet (Sewa) diisi tanah 685,400.00 unit 33.00 22,618,200.00

10 Pencabutan steel sheet pile tebal 10 mm 288,210.00 m1 1,410.00 406,376,100.00

D COFFERDAM SEMENTARA (HILIR)


HARGA VOLUME JUMLAH PROGRESS OF WORK QUANTITY
NO URAIAN PEKERJAAN SATUAN SAT PERUBAHAN HARGA PREVIOUS THIS UP
(Rp) (ADDENDUM-II) (Rp) PERIOD PERIOD TO DATE
1 2 3 4 5 6 7 8 9
1 Timbunan tanah yang didatangkan dari luar dengan Jarak 10 km 286,820.00 m3 - -

2 Urugan Sirtu/Hasil Galian 35,190.00 m3 6,272.92 220,743,878.85

3 Pemadatan Tanah Timbunan 8,800.00 m3 - -

4 Pemasangan Container 40 feet (Sewa) diisi tanah 26,750,400.00 unit 4.00 107,001,600.00

5 Bronjong 709,500.00 buah 620.00 439,890,000.00

6 Pengadaan dan Pemasangan Geotextille Non Woven 14,310.00 m2 1,264.00 18,087,840.00

7 Bongkaran Container 40 Feet (Sewa) diisi tanah 679,900.00 unit 4.00 2,719,600.00

E. DEWATERING -

1 Pemompaan Rembesan 75,000,000.00 Ls 1.00 75,000,000.00

JUMLAH BAB I 12,276,259,993.01


HARGA VOLUME JUMLAH PROGRESS OF WORK QUANTITY
NO URAIAN PEKERJAAN SATUAN SAT PERUBAHAN HARGA PREVIOUS THIS UP
(Rp) (ADDENDUM-II) (Rp) PERIOD PERIOD TO DATE
1 2 3 4 5 6 7 8 9

BAB. II PEKERJAAN BENDUNG

A TUBUH BENDUNG

1 Galian Tanah Cadas 60,810.00 m3 4,247.88 258,313,278.75


2 Galian Tanah Keras 32,180.00 m3 7,611.91 244,951,360.34
3 Pemindahan Tanah Hasil Galian dengan Dumptruck disekitar lokasi bendung 27,870.00 m3 11,859.79 330,532,291.56

4 Shotcrete beton K-150 145,000.00 m2 1,368.95 198,497,750.00


5 Bekisting dengan multiplek t = 12 mm 183,780.00 m2 1,478.10 271,644,562.59

6 Besi Beton (Ulir) 20,950.00 kg 31,322.47 656,205,754.88


7 Beton K-225 (ready mix) 1,783,360.00 kg 3,801.06 6,778,665,722.89
8 Beton K-350 (ready mix) 1,968,640.00 m3 313.97 618,085,534.08

9 Rubber Water Stop 325,000.00 m1 190.00 61,750,000.00


10 Beton K-175 Site Mix (Shelter) 1,522,660.00 m3 6.72 10,237,985.18

B. DINDING TEGAK

1 Galian Tanah Cadas 60,810.00 m3 1,043.28 63,441,917.61


2 Galian Tanah Keras 32,180.00 m3 1,609.74 51,801,368.84

3 Pemindahan Tanah Hasil Galian dengan Dumptruck disekitar lokasi bendung 27,870.00 m3 2,653.02 73,939,639.53
4 Bekisting dengan multiplek t = 12 mm 183,780.00 m2 1,611.35 296,133,201.51

5 Besi Beton (Ulir) 20,950.00 kg 35,732.87 748,603,609.74


6 Beton K-225 (ready mix) 1,783,360.00 m3 1,063.99 1,897,481,476.93
7 Timbunan tanah kembali dipadatkan dengan stamper 56,610.00 m3 1,702.68 96,388,771.41

8 Rubber Water Stop 325,000.00 m1 233.00 75,725,000.00

C. SAYAP UDIK & HILIR

1 Galian Tanah Cadas 60,810.00 m3 2,155.25 131,060,509.26


2 Galian Tanah Keras 32,180.00 m3 2,320.32 74,667,897.60

3 Pemindahan Tanah Hasil Galian dengan Dumptruck disekitar lokasi bendung 27,870.00 m3 4,475.57 124,734,024.42
4 Lantai Kerja Beton K-100 1,246,360.00 m3 89.81 111,934,220.60
5 Bekisting dengan multiplek t = 12 mm 183,780.00 m2 3,177.65 583,988,829.43

6 Besi Beton (Ulir) 20,950.00 kg 109,429.09 2,292,539,510.92


7 Beton K-225 (ready mix) 1,783,360.00 m3 2,184.73 3,896,165,585.55

8 Bekisting dengan multiplek t = 12 mm. 183,780.00 m2 - -


HARGA VOLUME JUMLAH PROGRESS OF WORK QUANTITY
NO URAIAN PEKERJAAN SATUAN SAT PERUBAHAN HARGA PREVIOUS THIS UP
(Rp) (ADDENDUM-II) (Rp) PERIOD PERIOD TO DATE
1 2 3 4 5 6 7 8 9
9 Timbunan tanah kembali dipadatkan dengan stamper 56,610.00 m3 4,764.22 269,702,720.64

D. BANGUNAN INTAKE BENDUNG KIRI

1 Galian Tanah Cadas 60,810.00 m3 - -

2 Galian Tanah Keras 32,180.00 m3 520.98 16,765,104.22

3 Pemindahan Tanah Hasil Galian dengan Dumptruck disekitar lokasi bendung 27,870.00 m3 520.98 14,519,684.73

4 Lantai Kerja Beton K-100 1,246,360.00 m3 8.61 10,731,159.60

5 Bekisting dengan multiplek t = 12 mm 183,780.00 m2 853.57 156,868,237.61

6 Besi Beton (Ulir) 20,950.00 kg 16,908.29 354,228,696.45

7 Beton K-225 (ready mix) 1,783,360.00 m3 304.32 542,706,306.33

8 Beton K-175 Site Mix (Shelter) 1,316,930.00 m3 6.72 8,854,708.09


HARGA VOLUME JUMLAH PROGRESS OF WORK QUANTITY
NO URAIAN PEKERJAAN SATUAN SAT PERUBAHAN HARGA PREVIOUS THIS UP
(Rp) (ADDENDUM-II) (Rp) PERIOD PERIOD TO DATE
1 2 3 4 5 6 7 8 9
E. BANGUNAN INTAKE BENDUNG KANAN

1 Galian Tanah Cadas 60,810.00 m3 - -

2 Galian Tanah Keras 32,180.00 m3 114.48 3,683,869.86

3 Pemindahan Tanah Hasil Galian dengan Dumptruck disekitar lokasi bendung 27,870.00 m3 114.48 3,190,473.99

4 Lantai Kerja Beton K-100 1,246,360.00 m3 8.61 10,731,159.60

5 Bekisting dengan multiplek t = 12 mm 183,780.00 m2 853.57 156,868,237.61

6 Besi Beton (Ulir) 20,950.00 kg 16,585.78 347,472,120.33

7 Beton K-225 (ready mix) 1,783,360.00 m3 295.39 526,784,468.25

8 Beton K-175 Site Mix (Shelter) 1,316,930.00 m3 6.72 8,854,708.09

F. LANTAI MUKA

1 Pembersihan lapangan/stripping 8,650.00 m2 2,660.00 23,009,000.00

2 Shotcrete beton K-150 145,000.00 m2 2,660.00 385,700,000.00

3 Galian Tanah Cadas 60,810.00 m3 1,784.31 108,503,647.86

4 Galian Tanah Keras 32,180.00 m3 8,066.69 259,586,212.92

5 Pemindahan Tanah Hasil Galian dengan Dumptruck disekitar lokasi bendung 27,870.00 m3 9,851.00 274,547,370.00

6 Bekisting dengan multiplek t = 12 mm 183,780.00 m2 537.00 98,689,860.00

7 Besi Beton (Ulir) 20,950.00 m3 97,230.29 2,036,974,593.46

8 Beton K-225 (ready mix) 1,783,360.00 m3 1,724.02 3,074,539,390.40

9 Pekerjaan Lapisan Pudel 234,920.00 m3 2,398.75 563,514,350.00

10 Rubber Water Stop 325,000.00 m1 56.00 18,200,000.00

G. KOLAM OLAK

1 Shotcrete beton K-150 145,000.00 m2 2,185.00 316,825,000.00

2 Galian Tanah Cadas 60,810.00 m3 18,090.04 1,100,055,210.78

3 Galian Tanah Keras 32,180.00 m3 16,157.85 519,959,613.00

4 Pemindahan Tanah Hasil Galian dengan Dumptruck disekitar lokasi bendung 27,870.00 m3 34,247.89 954,488,638.56

5 Bekisting dengan multiplek t = 12 mm 183,780.00 m2 2,085.63 383,296,713.84

6 Besi Beton (Ulir) 20,950.00 kg 352,726.83 7,389,626,995.56

7 Beton K-225 (ready mix) 1,783,360.00 m3 1,160.99 2,070,471,456.58

8 Beton K-350 (ready mix) 1,968,640.00 m3 3,936.29 7,749,134,992.64

9 Rubber Water Stop 325,000.00 m1 46.00 14,950,000.00


HARGA VOLUME JUMLAH PROGRESS OF WORK QUANTITY
NO URAIAN PEKERJAAN SATUAN SAT PERUBAHAN HARGA PREVIOUS THIS UP
(Rp) (ADDENDUM-II) (Rp) PERIOD PERIOD TO DATE
1 2 3 4 5 6 7 8 9

10 Rip-rap Batu Kali 452,100.00 m3 3,293.39 1,488,941,053.88

11 Bored Pile Tanah Cadas 1,600,325.00 m1 1,800.00 2,880,585,000.00

H. JEMBATAN PELAYANAN

1 Bekisting dengan multiplek t = 12 mm 183,780.00 m2 460.21 84,577,928.57

2 Besi Beton (Ulir) 20,950.00 kg 42,873.44 898,198,466.71

3 Beton K-225 (ready mix) 1,783,360.00 m3 505.33 901,193,511.94

4 Pemasangan Rangka Baja 206,800.00 kg 49,928.01 10,325,113,482.15

5 Pekerjaan Pasangan Batu Kali 1,157,010.00 m3 - -

6 Pengadaan dan Pemasangan Pipa GIP Ø 2" (Hand Rail) 350,000.00 m1 388.80 136,080,000.00

7 Bored Pile Tanah Cadas 1,600,325.00 m1 360.00 576,117,000.00

JUMLAH BAB II 67,012,330,947.83


HARGA VOLUME JUMLAH PROGRESS OF WORK QUANTITY
NO URAIAN PEKERJAAN SATUAN SAT PERUBAHAN HARGA PREVIOUS THIS UP
(Rp) (ADDENDUM-II) (Rp) PERIOD PERIOD TO DATE
1 2 3 4 5 6 7 8 9

BAB. III PEKERJAAN SALURAN MUKA

A. PEMBAWA KIRI

1 Galian Tanah Keras 32,180.00 m3 2,639.92 84,952,529.06

2 Pemindahan Tanah Hasil Galian dengan Dumptruck disekitar lokasi bendung 27,870.00 m3 2,639.92 73,574,486.79

3 Lantai Kerja Beton K-100 1,246,360.00 m3 30.55 38,081,034.17

4 Bekisting dengan multiplek t = 12 mm 183,780.00 m2 791.71 145,499,802.19

5 Beton K-225 (ready mix) 1,783,360.00 m3 228.67 407,809,063.32

6 Besi Beton (Ulir) 20,950.00 kg 29,635.34 620,860,391.44

7 Timbunan tanah kembali dipadatkan dengan stamper 56,610.00 m3 907.25 51,359,252.67

B. PEMBAWA KANAN

1 Galian Tanah Keras 32,180.00 m3 1,285.54 41,368,516.30

2 Pemindahan Tanah Hasil Galian dengan Dumptruck disekitar lokasi bendung 27,870.00 m3 1,285.54 35,827,860.45

3 Lantai Kerja Beton K-100 1,246,360.00 m3 61.27 76,363,978.66

4 Bekisting dengan multiplek t = 12 mm 183,780.00 m2 791.71 145,499,802.19

5 Beton K-225 (ready mix) 1,783,360.00 m3 266.62 475,475,698.14

6 Besi Beton (Ulir) 20,950.00 kg 23,689.00 496,284,601.96

7 Timbunan tanah kembali dipadatkan dengan stamper 56,610.00 m3 1,566.41 88,674,187.05

JUMLAH BAB III 2,781,631,204.39

BAB. IV PEKERJAAN KANTONG LUMPUR

A. KANTONG LUMPUR KIRI

1 Galian Tanah Keras 32,180.00 m3 22,124.45 711,964,801.00

2 Pemindahan Tanah Hasil Galian dengan Dumptruck disekitar lokasi bendung 27,870.00 m3 22,124.45 616,608,421.50

3 Lantai Kerja Beton K-100 1,246,360.00 m3 339.51 423,154,799.50

4 Bekisting dengan multiplek t = 12 mm 183,780.00 m2 2,637.18 484,660,572.84

5 Besi Beton (Ulir) 20,950.00 kg 116,386.60 2,438,299,165.25

6 Beton K-225 (ready mix) 1,783,360.00 m3 1,269.81 2,264,520,603.98

7 Timbunan tanah kembali dipadatkan dengan stamper 56,610.00 m3 2,472.34 139,959,337.23


HARGA VOLUME JUMLAH PROGRESS OF WORK QUANTITY
NO URAIAN PEKERJAAN SATUAN SAT PERUBAHAN HARGA PREVIOUS THIS UP
(Rp) (ADDENDUM-II) (Rp) PERIOD PERIOD TO DATE
1 2 3 4 5 6 7 8 9
B. KANTONG LUMPUR KANAN

1 Galian Tanah Keras 32,180.00 m3 15,699.47 505,209,073.32

2 Pemindahan Tanah Hasil Galian dengan Dumptruck disekitar lokasi bendung 27,870.00 m3 15,699.47 437,544,340.38

3 Lantai Kerja Beton K-100 1,246,360.00 m3 339.51 423,154,799.50

4 Bekisting dengan multiplek t = 12 mm 183,780.00 m2 2,637.18 484,660,572.84

5 Besi Beton (Ulir) 20,950.00 kg 116,386.60 2,438,299,165.25

6 Beton K-225 (ready mix) 1,783,360.00 m3 1,269.81 2,264,520,603.98

7 Timbunan tanah kembali dipadatkan dengan stamper 56,610.00 m3 2,345.57 132,782,717.70

JUMLAH BAB IV 13,765,338,974.28


HARGA VOLUME JUMLAH PROGRESS OF WORK QUANTITY
NO URAIAN PEKERJAAN SATUAN SAT PERUBAHAN HARGA PREVIOUS THIS UP
(Rp) (ADDENDUM-II) (Rp) PERIOD PERIOD TO DATE
1 2 3 4 5 6 7 8 9

BAB. V PEKERJAAN BANGUNAN PENGURAS DAN SALURAN

A. BANGUNAN PENGURAS KIRI DAN SALURAN PENGURAS

1 Galian Tanah Keras 32,180.00 m3 2,718.89 87,493,751.48


2 Pemindahan Tanah Hasil Galian dengan Dumptruck disekitar lokasi bendung 27,870.00 m3 2,718.89 75,775,352.82
3 Lantai Kerja Beton K-100 1,246,360.00 m3 45.41 56,595,905.15
4 Bekisting dengan multiplek t = 12 mm 183,780.00 m2 2,447.14 449,736,043.46
5 Besi Beton (Ulir) 20,950.00 kg 35,308.50 739,713,062.59
6 Beton K-225 (ready mix) 1,783,360.00 m3 528.69 942,851,990.78
7 Pekerjaan Pasangan Batu Kali 1,157,010.00 m3 127.06 147,011,900.49
8 Bronjong 890,860.00 buah 112.14 99,901,040.40
9 Beton K-175 Site Mix (Shelter) 1,316,930.00 m3 5.31 6,993,227.53

B. BANGUNAN PENGURAS KANAN DAN SALURAN PENGURAS


1 Galian Tanah Keras 32,180.00 m3 2,051.92 66,030,624.70
2 Pemindahan Tanah Hasil Galian dengan Dumptruck disekitar lokasi bendung 27,870.00 m3 2,051.92 57,186,871.05
3 Lantai Kerja Beton K-100 1,246,360.00 m3 28.22 35,170,129.23
4 Bekisting dengan multiplek t = 12 mm 183,780.00 m2 1,903.25 349,778,737.34
5 Besi Beton (Ulir) 20,950.00 kg 26,024.06 545,203,957.12
6 Beton K-225 (ready mix) 1,783,360.00 m3 565.75 1,008,941,517.97
7 Pekerjaan Pasangan Batu Kali 1,157,010.00 m3 127.06 147,011,900.49
8 Bronjong 890,860.00 buah 55.56 49,496,181.60
9 Beton K-175 Site Mix (Shelter) 1,316,930.00 m 3
5.31 6,993,227.53

JUMLAH BAB V 4,871,885,421.73

BAB. VI PEKERJAAN BANGUNAN PENGAMBILAN

A. BANGUNAN PENGAMBILAN KIRI

1 Galian Tanah Keras 32,180.00 m3 222.61 7,163,525.44


2 Pemindahan Tanah Hasil Galian dengan Dumptruck disekitar lokasi bendung 27,870.00 m3 222.61 6,204,084.96
3 Lantai Kerja Beton K-100 1,246,360.00 m3 13.43 16,735,249.63
4 Bekisting dengan multiplek t = 12 mm 183,780.00 m2 429.65 78,961,450.73
5 Besi Beton (Ulir) 20,950.00 kg 17,995.81 377,012,250.33
6 Beton K-225 (ready mix) 1,783,360.00 m3 322.83 575,724,484.24
7 Pengadaan Pintu Sorong Baja Stang Ganda B=1200 mm, L=1000 mm (Manual) 120,000,000.00 buah 2.00 240,000,000.00
HARGA VOLUME JUMLAH PROGRESS OF WORK QUANTITY
NO URAIAN PEKERJAAN SATUAN SAT PERUBAHAN HARGA PREVIOUS THIS UP
(Rp) (ADDENDUM-II) (Rp) PERIOD PERIOD TO DATE
1 2 3 4 5 6 7 8 9
8 Beton K-175 Site Mix (Shelter) 1,316,930.00 m3 5.31 6,993,227.53

B. BANGUNAN PENGAMBILAN KANAN

1 Galian Tanah Keras 32,180.00 m3 404.76 13,025,176.80


2 Pemindahan Tanah Hasil Galian dengan Dumptruck disekitar lokasi bendung 27,870.00 m3 404.76 11,280,661.20
3 Lantai Kerja Beton K-100 1,246,360.00 m3 7.94 9,898,778.07
4 Bekisting dengan multiplek t = 12 mm 183,780.00 m2 359.80 66,124,760.74
5 Besi Beton (Ulir) 20,950.00 kg 16,838.78 352,772,338.76
6 Beton K-225 (ready mix) 1,783,360.00 m3 194.60 347,047,562.75
7 Pengadaan Pintu Sorong Baja Stang Ganda B=1200 mm, L=1000 mm (Manual) 115,000,000.00 buah 2.00 230,000,000.00
8 Beton K-175 Site Mix (Shelter) 1,316,930.00 m3 5.31 6,993,227.53

JUMLAH BAB VI 2,345,936,778.72


HARGA VOLUME JUMLAH PROGRESS OF WORK QUANTITY
NO URAIAN PEKERJAAN SATUAN SAT PERUBAHAN HARGA PREVIOUS THIS UP
(Rp) (ADDENDUM-II) (Rp) PERIOD PERIOD TO DATE
1 2 3 4 5 6 7 8 9

VII PEKERJAAN SALURAN PEMBAWA

A. SALURAN PEMBAWA KIRI

1 Galian Tanah Keras 32,180.00 m3 1,765.48 56,812,985.50


2 Pemindahan Tanah Hasil Galian dengan Dumptruck disekitar lokasi bendung 27,870.00 m3 1,765.48 49,203,788.25
3 Lantai Kerja Beton K-100 1,246,360.00 m3 18.90 23,550,844.65
4 Bekisting dengan multiplek t = 12 mm 183,780.00 m2 593.38 109,051,743.96
5 Beton K-225 (ready mix) 1,783,360.00 m3 66.77 119,081,723.97
6 Besi Beton (Ulir) 20,950.00 kg 3,727.45 78,090,084.83
7 Pekerjaan Pasangan Batu Kali 1,157,010.00 m3 245.88 284,482,147.77
8 Siaran 46,540.00 m2 548.64 25,533,705.60

B. SALURAN PEMBAWA KANAN

1 Galian Tanah Keras 32,180.00 m3 174.62 5,619,368.14


2 Pemindahan Tanah Hasil Galian dengan Dumptruck disekitar lokasi bendung 27,870.00 m3 174.62 4,866,743.01
3 Lantai Kerja Beton K-100 1,246,360.00 m3 8.50 10,589,822.38
4 Bekisting dengan multiplek t = 12 mm 183,780.00 m2 250.61 46,057,840.92
5 Beton K-225 (ready mix) 1,783,360.00 m3 30.43 54,273,351.55
6 Besi Beton (Ulir) 20,950.00 m3 1,664.68 34,875,122.47
7 Pekerjaan Pasangan Batu Kali 1,157,010.00 m3 118.55 137,161,221.48
8 Siaran 46,540.00 m2 219.46 10,213,482.24

JUMLAH BAB VII 1,049,463,976.72

BAB. VIII PEKERJAAN PENDUKUNG

A. JALAN INSPEKSI

1 Pembuatan Jalan Inspeksi


a. Pemasangan batu belah 520,300.00 m3 3,000.00 1,560,900,000.00
b. Pemasangan batu pecah 552,790.00 m3 1,200.00 663,348,000.00
c. Pemasangan sirtu (pasir batu) 300,190.00 m3 600.00 180,114,000.00

B. SALURAN GENDONG

1 Pekerjaan Pasangan Batu Kali 1,157,010.00 m3 254.20 294,111,942.00 183.40 183.40


2 Plesteran 81,490.00 m2 553.50 45,104,715.00 112.00 112.00
HARGA VOLUME JUMLAH PROGRESS OF WORK QUANTITY
NO URAIAN PEKERJAAN SATUAN SAT PERUBAHAN HARGA PREVIOUS THIS UP
(Rp) (ADDENDUM-II) (Rp) PERIOD PERIOD TO DATE
1 2 3 4 5 6 7 8 9
C. RUMAH JAGA BENDUNG

1 Pembangunan Rumah Genset Type -21 4,350,000.00 m3 25.00 108,750,000.00


2 Pembangunan Rumah Jaga Bendung Type-45 4,350,000.00 m3 47.19 205,265,625.00

D. PEKERJAAN LAIN-LAIN

1 Pengadaan dan Pemasangan Pipa GIP Ø 2" (Hand Rail) 350,000.00 m1 430.00 150,500,000.00
2 Pemasangan papan nama bendung 4,750,000.00 buah 1.00 4,750,000.00
3 Pemasangan papan operasi bendung 4,750,000.00 buah 1.00 4,750,000.00
4 Pemasangan papan larangan 4,750,000.00 buah 1.00 4,750,000.00
5 Pemasangan mistar ukur p = 4,00 m 475,000.00 m1 8.00 3,800,000.00
6 Pemasangan Nomenklatur Bendung 7,500,000.00 buah 2.00 15,000,000.00

JUMLAH BAB VIII 3,241,144,282.00


HARGA VOLUME JUMLAH PROGRESS OF WORK QUANTITY
NO URAIAN PEKERJAAN SATUAN SAT PERUBAHAN HARGA PREVIOUS THIS UP
(Rp) (ADDENDUM-II) (Rp) PERIOD PERIOD TO DATE
1 2 3 4 5 6 7 8 9
BAB. IX PEKERJAAN REHABILITASI SALURAN INDUK
1 Galian Tanah Keras 32,180.00 m3 14,409.01 463,682,068.64
2 Pemindahan Tanah Hasil Galian dengan Dumptruck disekitar lokasi bendung 27,870.00 m3 14,409.01 401,579,218.55
3 Perapian pada Disposal Area/Tanggul 21,310.00 m 3
14,409.01 307,056,087.10
4 Galian Tanah Manual sedalam < 1 m 94,180.00 m3 704.70 66,368,646.00
5 Pekerjaan Pasangan Batu Kali 1,157,010.00 m 3
2,585.84 2,991,847,366.44 162.24 162.24
6 Plesteran 81,490.00 m2 1,043.20 85,010,368.00
7 Siaran 46,540.00 m 2
5,925.31 275,764,020.48 178.40 178.40
8 Lantai Kerja Beton K-100 1,246,360.00 m3 198.57 247,485,966.12
9 Bekisting dengan multiplek t = 12 mm 183,780.00 kg 7,236.20 1,329,869,019.78
10 Besi Beton (Ulir) 20,950.00 m3 47,116.95 987,100,053.27 3,672.19 3,672.19
11 Beton K-225 (ready mix) 1,783,360.00 m 3
887.02 1,581,880,623.94 10.50 10.50
12 Timbunan tanah yang didatangkan dari luar dengan Jarak 10 km 286,820.00 m3 6,198.75 1,777,925,475.00
13 Bongkaran Pasangan Batu 148,280.00 m 3
605.38 89,766,235.28
JUMLAH BAB IX 10,605,335,148.60

BAB. X PEKERJAAN MEKANIKAL ELEKTRIKAL


1 Pintu Penggerak Electrik b =1500 mm h1=4m (Penguras dan Under Sluice) 580,000,000.00 unit 4.00 2,320,000,000.00
2 Pintu Penggerak Elektrik b =2,500 mm h1=1,500 mm (Pengambilan Kiri) 480,000,000.00 bh 2.00 960,000,000.00
3 Pintu Penggerak Elektrik b =1,500 mm h1=1,250 mm (Pengambilan Kanan) 440,000,000.00 bh 2.00 880,000,000.00
4 Pintu Penggerak Elektrik b =1,200 mm h=1,100 mm (Penguras Kiri) 423,000,000.00 bh 2.00 846,000,000.00
5 Pintu Penggerak Elektrik b =1,200 mm h=1,000 mm (Penguras Kanan) 418,000,000.00 bh 2.00 836,000,000.00
6 Generator Set 30 KVA (Silent Type), Including Helical Gear Motor ( 2 HP / 1.5 Kw ) 280,000,000.00 unit 1.00 280,000,000.00
7 Tanki Stock Bahan Bakar 100,000,000.00 unit 1.00 100,000,000.00
8 Tanki Supply Bahan Bakar 25,000,000.00 unit 2.00 50,000,000.00
1
9 Power Cable 750,000.00 m 350.00 262,500,000.00
10 Panel Control ( Panel Distribusi Lokal ) 45,000,000.00 unit 2.00 90,000,000.00
11 Pagar Pintu Keliling Penguras Kiri 96,000,000.00 unit 1.00 96,000,000.00
12 Pagar Pintu Keliling Penguras Kanan 57,500,000.00 unit 1.00 57,500,000.00
JUMLAH BAB X 6,778,000,000.00

JUMLAH SELURUH ( BAB I s/d BAB. X) 124,727,326,727

PPN 10% 12,472,732,673

JUMLAH TOTAL 137,200,059,400

DIBULATKAN 137,200,059,000
PROGRESS OF WORK QUANTITY WEIGHT OF
OUT WORK
STANDING %
10 11
PROGRESS OF WORK QUANTITY WEIGHT OF
OUT WORK
STANDING %
10 11
PROGRESS OF WORK QUANTITY WEIGHT OF
OUT WORK
STANDING %
10 11
PROGRESS OF WORK QUANTITY WEIGHT OF
OUT WORK
STANDING %
10 11
PROGRESS OF WORK QUANTITY WEIGHT OF
OUT WORK
STANDING %
10 11
PROGRESS OF WORK QUANTITY WEIGHT OF
OUT WORK
STANDING %
10 11
PROGRESS OF WORK QUANTITY WEIGHT OF
OUT WORK
STANDING %
10 11
PROGRESS OF WORK QUANTITY WEIGHT OF
OUT WORK
STANDING %
10 11
PROGRESS OF WORK QUANTITY WEIGHT OF
OUT WORK
STANDING %
10 11
PROGRESS OF WORK QUANTITY WEIGHT OF
OUT WORK
STANDING %
10 11
PROGRESS OF WORK QUANTITY WEIGHT OF
OUT WORK
STANDING %
10 11

70.80
441.50
PROGRESS OF WORK QUANTITY WEIGHT OF
OUT WORK
STANDING %
10 11
PROGRESS OF WORK QUANTITY WEIGHT OF
OUT WORK
STANDING %
10 11

2,423.60

5,746.91

43,444.76
876.52
OPNAME PEKERJAAN BORONGAN

MANDOR : JUMARNO

PERIODE :

QUANTITY
I PEKERJAAN BORED PILE SATUAN VOLUME
KONTRAK
S/D MINGGU
LALU

1 Besi Ulir D.19 kg

2 Besi Ulir D.13 kg

3 Besi Ulir D.19 kg

4 Besi Ulir D.13 kg

5 Besi Ulir D.16 kg

6 Besi Ulir D.13 kg

II PEKERJAAN PRECAST

1 Begisting Cor Lantai Kerja Precast m1

2 Cor Lantai Kerja Precast K-100 m3


AME PEKERJAAN BORONGAN

QUANTITY
HARGA JUMLAH
SATUAN HARGA
MINGGU INI KOMULATIF

3,746.40 3,746.40 1,400.00 5,244,960.00

873.60 873.60 1,400.00 1,223,040.00

2,435.16 2,435.16 1,400.00 3,409,224.00

1,135.68 1,135.68 1,400.00 1,589,952.00

1,896.00 1,896.00 1,400.00 2,654,400.00

748.80 748.80 1,400.00 1,048,320.00

52.00 52.00 10,000.00 520,000.00

12.00 12.00 2,500.00 30,000.00

JUMLAH : 15,719,896.00
OPNAME PEKERJAAN KANTONG LUMPUR

MANDOR : ROFIK

PERIODE : 22 Juli 2018 s/d 2 Agustus 2018

QUANTITY
I Kantong lumpur SATUAN VOLUME
KONTRAK
S/D MINGGU
LALU

1 Besi Ulir d.13 9m

2 Besi Ulir d.13 12x2m

3 Besi Ulir d.13 12m

4 Besi Ulir d.13 100m

5 Besi Ulir d.13 2,1m

6 Besi Ulir d.13 1m

7 Perataan tanah

8 Concrite K-225

9 Water Stop

10 Bekisting Form Work

11 Concrate Coin Wall


QUANTITY
I Kantong lumpur SATUAN VOLUME
KONTRAK
S/D MINGGU
LALU

12 Cor Lantai Kerja

13 Pasang Bekisting Stopcor

14 Pasang Bekisting Blakaut

II PEKERJAAN PRECAST INDUK INTAKE

1 Begisting Frame Saluran Induk Mengker TP 1

2 Begisting Frame Saluran Induk Mengker TP 2

3 Begisting Frame Saluran Induk Mengker TP 3

4 Besi Ulir d.13 TP 1

5 Besi Ulir d.13 TP 2

6 Besi Ulir d.13 TP 1

7 Besi Polos d.10 TP 1

8 Besi Polos d.10 TP 2

9 Besi Polos d.10 TP 3

10 Concret Precast TP 1

11 Concret Precast TP 2
QUANTITY
I Kantong lumpur SATUAN VOLUME
KONTRAK
S/D MINGGU
LALU

12 Concret Precast TP 3

III TEMPAT PABRIKASI PRECAST

1 Prataan Tanah Pabrikasi

2 Pasang Geotek

3 Pengecoran LC Lantai Kerja Pabrikasi


JAAN KANTONG LUMPUR

QUANTITY
HARGA JUMLAH
SATUAN HARGA
MINGGU INI KOMULATIF

6,140.16 6,140.16 1,400.00 8,596,224.00

3,594.24 3,594.24 1,400.00 5,031,936.00

9,984.00 9,984.00 1,400.00 13,977,600.00

349.44 349.44 1,400.00 489,216.00

471.74 471.74 1,400.00 660,441.60

112.32 112.32 1,400.00 157,248.00

120.00 120.00 3,000.00 360,000.00

136.00 136.00 75,000.00 10,200,000.00

19.00 19.00 5,000.00 95,000.00

13.00 13.00 25,000.00 325,000.00

12.90 12.90 75,000.00 967,500.00


QUANTITY
HARGA JUMLAH
SATUAN HARGA
MINGGU INI KOMULATIF

704.50 704.50 10,000.00 7,045,000.00

150.60 150.60 2,500.00 376,500.00

18.00 18.00 5,000.00 90,000.00

47.50 47.50 25,000.00 1,187,500.00

36.50 36.50 25,000.00 912,500.00

131.00 131.00 25,000.00 3,275,000.00

1235.52 1,235.52 1,400.00 1,729,728.00

1123.2 1,123.20 1,400.00 1,572,480.00

2076.256 2,076.26 1,400.00 2,906,758.40

348.50 348.50 1,400.00 487,900.00

237.50 237.50 1,400.00 332,500.00

910.00 910.00 1,400.00 1,274,000.00

10.23 10.23 75,000.00 767,250.00


0.205463
7.20 7.20 75,000.00 540,000.00
QUANTITY
HARGA JUMLAH
SATUAN HARGA
MINGGU INI KOMULATIF

23.46 23.46 75,000.00 1,759,500.00

120.00 120.00 3,000.00 360,000.00

120.00 120.00 -

120.00 120.00 2,500.00 300,000.00

JUMLAH : 65,776,782.00
OPNAME PEKERJAAN KANTONG LUMPUR

MANDOR : ROFIK
PERIODE : 22 Juli 2018 s/d 2 Agustus 2018

I Kantong lumpur SATUAN VOLUME QUANTITY


KONTRAK S/D MINGGMINGGU INKOMULATI
1 Besi Ulir d.13 9m 6140.16
2 Besi Ulir d.13 12x2m 3594.24
3 Besi Ulir d.13 12m 9984
4 Besi Ulir d.13 100m 349.44
5 Besi Ulir d.13 2,1m 471.744
6 Besi Ulir d.13 1m 112.32
7 Perataan tanah 120
8 Concrite K-225 136
9 Water Stop 19
10 Bekisting Form Work 13
11 Concrate Coin Wall 12.9
12 Cor Lantai Kerja 704.5
13 Pasang Bekisting Stopcor 150
14 Pasang Bekisting Blakaut
II PEKERJAAN PRECAST INDUK INTAKE
1 Begisting Frame Saluran Induk Mengker TP 1 47.5
2 Begisting Frame Saluran Induk Mengker TP 2 36.5
3 Begisting Frame Saluran Induk Mengker TP 3 131
4 Besi Ulir d.13 TP 1 0.205463
5 Besi Ulir d.13 TP 2
6 Besi Polos d.10 TP 1
7 Besi Polos d.10 TP 2
8 Besi Polos d.10 TP 3
HARGA JUMLAH
SATUAN HARGA

0.205463