UKURAN BERAT
(mm) (Kg)
6 0.222
8 0.395
9 0.500
10 0.617
12 0.888
13 1.040
16 1.578
16 1.578
19 2.223
22 2.985
25 3.853
28 4.830
29 5.185
32 6.313
36 7.990
6p 0.22
8p 0.4
9p 0.5
10p 0.62
12p 0.89
13p 1.04
16p 1.57
16p 1.58
19p 2.23
22p 2.98
25p 3.85
28p 4.83
29p 5.19
32p 6.31
36p 7.99
W
TABEL
SPESIFIKASI GALIAN TANAH PIPA GIP & DCIP
w Ǿ w
TABEL
SPESIFIKASI GALIAN TANAH PIPA HDPE
Urugan Tanah
Kembali Ǿ Pipa W w H h
Tanah Asli
H Inch mm cm cm cm cm
1/2 15 16,3 7,5 25 7,5
3/4 20 17 7,5 30 7,5
1 25 22,5 10 30 7,5
Pasir Urug h 1 1/2 40 24 10 30 7,5
2 50 25 10 30 7,5
Diameter 3 75 32.5 12,5 35 7,5
pipa Ǿ 4 100 40 15 35 10
6 150 55 20 40 10
8 200 60 20 45 10
h 10 250 65 20 50 15
w Ǿ w
Urugan Pasir Dia Pipa Panjang m' Lebar Tinggi vol urugan Vol dia Pipa Vol Urugan
Inch a ( mm ) b c d e = b x c x d f = 1/2a x π² g=e-f
1/2 15 1.00 0.163 0.165 0.027 0.018 0.009
3/4 20 1.00 0.170 0.170 0.029 0.000 0.029
1 25 1.00 0.225 0.175 0.039 0.000 0.039
1 1/2 40 1.00 0.240 0.190 0.046 0.001 0.044
2 50 1.00 0.250 0.200 0.050 0.002 0.048
3 75 1.00 0.325 0.225 0.073 0.004 0.069
4 100 1.00 0.400 0.300 0.120 0.008 0.112
6 150 1.00 0.550 0.350 0.193 0.018 0.175
8 200 1.00 0.600 0.400 0.240 0.031 0.209
10 250 1.00 0.650 0.550 0.358 0.049 0.308
12 300 1.00 0.650 0.600 0.390 0.071 0.319
Uraian Pekerjaan Inch Dia. Pipa Pjng Lebar Tingi Volume
(w) (H+h+Ø+h)
GALIAN DAN TIMBUNAN PIPA HDPE
Galian Tanah 1/2 22 1.00 0.163 0.422 0.069
3/4 25 1.00 0.170 0.475 0.081
1 32 1.00 0.225 0.482 0.108
1 1/2 50 1.00 0.240 0.500 0.120
2 63 1.00 0.250 0.513 0.128
3 90 1.00 0.325 0.600 0.195
4 110 1.00 0.400 0.710 0.284
6 160 1.00 0.550 0.760 0.418
8 200 1.00 0.600 0.800 0.480
10 250 1.00 0.650 1.050 0.683
Ǿ Pipa Volume
Uraian Pekerjaan Pjng Lebar Tingi
Inch Dia. Pipa ( mm ) Urugan
Urugan Tanah 1/2 22 1.00 0.170 0.250 0.043
3/4 25 1.00 0.170 0.300 0.051
1 32 1.00 0.223 0.300 0.067
1 1/2 50 1.00 0.250 0.300 0.075
2 63 1.00 0.263 0.300 0.079
3 90 1.00 0.340 0.350 0.119
4 110 1.00 0.410 0.400 0.164
6 160 1.00 0.560 0.400 0.224
8 200 1.00 0.600 0.400 0.240
Ø (Dia.Pipa) W w H h 10 250 1.00 0.650 0.500 0.325
Inch (mm) cm cm cm Cm
½ 22 17.00 7.5 25 7.5
¾ 25 17.00 7.5 30 7.5 Urugan Pasir Dia Pipa Panjang m' Lebar Tinggi vol urugan Vol dia Pipa Vol Urugan
1 32 23.20 10 30 7.5 Inch a ( mm ) b c d e = b x c x d f = 1/2a x π² g=e-f
1 1/2 50 25.00 10 30 7.5 1/2 22 1.00 0.163 0.165 0.027 - 0.027
2 63 26.30 10 30 7.5 3/4 25 1.00 0.170 0.170 0.029 - 0.029
3 90 34.00 12.5 35 8 1 32 1.00 0.225 0.175 0.039 - 0.039
4 110 41.00 15 40 10 1 1/2 50 1.00 0.240 0.190 0.046 - 0.046
6 160 56.00 20 40 10 2 63 1.00 0.250 0.200 0.050 - 0.050
8 200 60.00 20 40 10 3 90 1.00 0.325 0.225 0.073 - 0.073
10 250 65.00 20 50 15 4 110 1.00 0.400 0.300 0.120 - 0.120
6 160 1.00 0.550 0.350 0.193 - 0.193
8 200 1.00 0.600 0.400 0.240 - 0.240
10 250 1.00 0.650 0.550 0.358 - 0.358
REKAPITULASI
INSTASI : KEMENTERIAN PERHUBUNGAN
PEKERJAAN : PEMBANGUNAN FASILITAS PENDUKUNG PELABUHAN BORONG
LOKASI : KABUPATEN MANGGARAI TIMUR
TAHUN : 2022
1 2 3
JUMLAH 5,909,948,159.14
PPN 10% 590,994,815.91
JUMLAH TOTAL 6,500,942,975.06
JUMLAH DIBULATKAN 6,500,900,000.00
Terbilang : Enam milyar lima ratus juta sembilan ratus ribu rupiah
Mengetahui :
…................................
REKAPITULASI
INSTASI : KEMENTERIAN PERHUBUNGAN
PEKERJAAN :
LOKASI : KABUPATEN MANGGARAI TIMUR
TAHUN : 2022
1 2 3
JUMLAH 910,974,439.55
PPN 10% 91,097,443.96
JUMLAH TOTAL 1,002,071,883.51
JUMLAH DIBULATKAN 1,002,000,000.00
…................................ …..................................
Team Leader
RENCANA ANGGARAN BIAYA
PEKERJAAN : 0
LOKASI : KABUPATEN MANGGARAI TIMUR
TAHUN : 2022
I Pekerjaan Persiapan
- Pembuatan Papan Nama Proyek Ls 1.00 600,000.00 600,000.00
- Mobilisasi dan Demobilisasi Ls 1.00 23,900,000.00 23,900,000.00
- Pemasangan Bowplank M 50.00 47,979.00 2,398,950.00
- Keselamatan Kenyamanan Kerja Ls 1.00 21,300,000.00 21,300,000.00
Total 48,198,950.00
II Pekerjaan Struktur
- Pekerjaan Tanah
Galian Tanah Keras M3 -
Urugan Tanah Kembali M3 -
Urugan Pasir Sirtu M3 -
Total -
- Pekerjaan Pondasi
Pasangan Batu Kosong (Anstamping) M3 -
Urugan Pasir M3 -
Pasangan Batu Karang/Batu Kali Campuran 1 PC : 4 PP M3 -
Total -
- Pekerjaan Beton
Sloft Beton Bertulang Ukuran 10 x 15 cm M -
Kolom Praktis Beton Bertulang Ukuran 11 x 11 cm M -
Rink Balk Beton Bertulang Ukuran 10 x 15 cm M -
Total -
Total Pekerjaan Struktur -
III Pekerjaan Arsitektur
- Pekerjaan Tembok
Pasangan Dinding Batako Campuran 1 PC : 4 PP M2 -
Plesteran Tebal 1,5 cm Campuran 1 PC : 3 PP M2 -
Acian M2 -
Pengecetan M2 -
Total -
- Pekerjaan Kusen Pintu Jendela dan Daun Pintu Jendela
Kusen Pintu Alluminium Type 1 M -
Kusen Pintu Alluminium Type 2 M -
Pemasangan Daun Pintu Kalsiboard dan Aksesories Lengkap Terpasang Type 1 M2 -
Pemasangan Daun Pintu Kalsiboard dan Aksesories Lengkap Terpasang Type 2 M2 -
Kusen Jendela Alluminium dengan Kaca Lengkap Terpasang (Type 1) M2 -
Kusen Jendela Alluminium dengan Kaca Lengkap Terpasang (Type 2) M2 -
Kusen Boven Alluminium dengan Kaca Lengkap Terpasang M2 -
Bata Roster M3 -
Total -
- Pekerjaan Lantai
Pasangan Lantai Granit Ukuran 60 x 60 cm M2 -
Pasangan Plint Granit Ukuran 10 x 60 cm M2 -
Pasangan Lantai Keramik Kamar Mandi Ukuran 20 x 20 cm M2 -
Pasangan Dinding Keramik Kamar Mandi Ukuran 20 x 20 cm M2 -
Total -
- Pekerjaan Penutup Plafond
Pemasangan Rangka Plafond M2 -
Pemasangan Penutup Plafond Gypsum Board M2 -
Pemasangan List Plafond M -
Pengecetan Plafond M2 -
Total -
- Pekerjaan Penutup Atap
Pemasangan Rangka Rangka Atap Baja Ringan M2 -
Pemasangan Atap Genteng Metal M2 -
Pemasangan List Plank GRC Ukuran 0,04 x 20 cm M -
Total -
Total Pekerjaan Arsitektur -
HARGA SATUAN HARGA SATUAN
NO. URAIAN PEKERJAAN SATUAN VOLUME
(Rp.) PEKERJAAN (Rp.)
1 2 3 4 5
Total -
Total Pekerjaan Mekanikal dan Elektrikal -
V Pekerjaan Penyelesaian
- Dokumentasi, Administrasi dan Pelaporan Ls 1.00 3,700,000.00 3,700,000.00
- Pembersihan Lokasi Pasca Pekerjaan Ls 1.00 1,000,000.00 1,000,000.00
Total Pekerjaaan Penyelesaian 4,700,000.00
Sub
No Uraian Panjang Lebar Tinggi Tebal Luas 1 Luas 2 Jumlah 1 Jumlah 2 Volume Satuan
Volume
1 2 3 4 5 6 7 8 9 10 11.00 12 13
Pekerjaan Tanah
Galian Tanah Keras 22.00 0.80 0.70 12.32 m3
Urugan Tanah Kembali 22.00 0.13 2.00 5.50 m3
Urugan Pasir Sirtu 6.00 5.00 0.20 6.00 m3
Pekerjaan Pondasi
Pasangan Batu Kosong (Anstamping) 22.00 0.80 0.10 1.76 m3
Urugan Pasir 22.00 0.80 0.05 0.88 m3
Pasangan Batu Karang/Batu Kali Campuran 1 PC : 4 PP 22.00 0.32 6.93 m3
Pekerjaan Beton
Sloft Beton Bertulang Ukuran 10 x 15 cm 22.00 22.00 m
Kolom Praktis Beton Bertulang Ukuran 11 x 11 cm 3.50 4.00 14.00 m
Rink Balk Beton Bertulang Ukuran 10 x 15 cm 22.00 22.00 m
Pekerjaan Tembok
Pasangan Dinding Batako Campuran 1 PC : 4 PP 22.00 3.50 77.00 5.95 71.05 m2
Plesteran Tebal 1,5 cm Campuran 1 PC : 3 PP 142.10 m2
Acian 142.10 m2
Pengecetan 142.10 m2
Pekerjaan Lantai
Beton Lantai Dasar K-100 6.00 5.00 0.03 0.90 m3
Beton Lantai Mutu K-250 6.00 5.00 0.07 2.10 m3
1 2 3
JUMLAH 1,209,807,897.35
PPN 10% 120,980,789.74
JUMLAH TOTAL 1,330,788,687.09
JUMLAH DIBULATKAN 1,330,700,000.00
Terbilang : Satu milyar tiga ratus tiga puluh juta tujuh ratus ribu rupiah
Mengetahui :
…................................
RENCANA ANGGARAN BIAYA
PEKERJAAN : Rehabilitasi Gedung Kantor
LOKASI : Kabupaten Manggarai Timur
TAHUN : 2022
- Pekerjaan Lantai
Pasangan Lantai Keramik Ukuran 30 x 30 cm
Pasangan Lantai Keramik Kamar Mandi Ukuran 20 x 20 cm
Pasangan Dinding Keramik Kamar Mandi Ukuran 20 x 20 cm
Total 33,067,472.80
Total 32,296,940.00
Total 138,417,510.00
ktur 399,345,806.60
399,345,806.60
ung Kantor 399,345,806.60
RENCANA ANGGARAN BIAYA PEMBANGUNAN GU
PEKERJAAN : PEMBANGUNAN GUDANG
LOKASI : KABUPATEN MANGGARAI TIMUR
TAHUN : 2022
I Pekerjaan Persiapan
- Pembuatan Papan Nama Proyek
- Mobilisasi dan Demobilisasi
- Pemasangan Bowplank
- Keselamatan Kenyamanan Kerja
II Pekerjaan Struktur
- Pekerjaan Tanah
Galian Tanah Keras
Urugan Tanah Kembali
Urugan Pasir Sirtu
- Pekerjaan Lantai
Urugan Pasir Sirtu
Beton Lantai Kerja Dengan Mutu FC = 7,4 MPa (K-100), SLUMP (3-6)
Beton Lantai Dengan Mutu FC = 21,7 MPa (K-250), SLUMP (120±20)
Total 16,813,485.17
Total 43,903,266.40
Total 119,843,088.57
Total 16,786,190.77
Total 16,786,190.77
tur 156,509,447.65
Total 17,659,807.20
Total 27,965,508.90
Total 46,132,282.00
Total 120,665,560.80
ktur 702,045,041.90
48,198,950.00
156,509,447.65
702,045,041.90
4,221,000.00
umah Dinas 862,775,489.55
REKAPITULASI
INSTASI : KEMENTERIAN PERHUBUNGAN
PEKERJAAN :
LOKASI : KABUPATEN MANGGARAI TIMUR
TAHUN : 2022
1 2 3
JUMLAH 467,771,305.03
PPN 10% 46,777,130.50
JUMLAH TOTAL 514,548,435.53
JUMLAH DIBULATKAN 514,500,000.00
…................................ …..................................
Team Leader
RENCANA ANGGARAN BIAYA PEMBANGUNAN RUMAH DINAS
I Pekerjaan Struktur
- Pekerjaan Tanah
Galian Tanah Keras M3 36.00 140,070.00 5,042,520.00
Urugan Tanah Kembali M3 15.84 25,264.00 400,181.76
Urugan Pasir Sirtu M3 10.08 293,980.00 2,963,318.40
Total 8,406,020.16
- Pekerjaan Pondasi
Pasangan Batu Kosong (Anstamping) M3 10.20 344,357.00 3,512,441.40
Urugan Pasir M3 3.40 309,074.00 1,050,851.60
Pasangan Batu Karang/Batu Kali Campuran 1 PC : 4 PP M3 44.88 896,710.00 40,244,344.80
Total 44,807,637.80
- Pekerjaan Beton
Sloft Beton Bertulang Ukuran 10 x 15 cm M 68.00 158,482.00 10,776,776.00
Kolom Praktis Beton Bertulang Ukuran 11 x 11 cm M 72.60 130,878.00 9,501,742.80
Rink Balk Beton Bertulang Ukuran 10 x 15 cm M 68.00 158,482.00 10,776,776.00
Total 31,055,294.80
Total Pekerjaan Struktur 84,268,952.76
II Pekerjaan Arsitektur
- Pekerjaan Tembok
Pasangan Dinding Batako Campuran 1 PC : 4 PP M2 156.74 471,430.00 73,891,938.20
Plesteran Tebal 1,5 cm Campuran 1 PC : 3 PP M2 313.48 65,236.00 20,450,181.28
Acian M2 156.76 35,958.00 5,636,776.08
Pengecetan M2 156.76 58,331.00 9,143,967.56
Total 109,122,863.12
- Pekerjaan Kusen Pintu Jendela dan Daun Pintu Jendela
Kusen Pintu Alluminium Type 1 M 42.00 244,201.00 10,256,442.00
Kusen Pintu Alluminium Type 2 M 12.40 244,201.00 3,028,092.40
Pemasangan Daun Pintu Kalsiboard dan Aksesories Lengkap Terpasang Type 1 Unit 6.00 1,156,000.00 6,936,000.00
Pemasangan Daun Pintu Kalsiboard dan Aksesories Lengkap Terpasang Type 2 Unit 2.00 1,156,000.00 2,312,000.00
Kusen Jendela Alluminium (Type 1) M 22.95 244,201.00 5,604,412.95
Kusen Jendela Alluminium (Type 2) M 1.36 244,201.00 332,113.36
Daun Jendela Alluminium dengan Kaca Lengkap Terpasang (Type 1) Unit 7.00 958,550.00 6,709,850.00
Daun Jendela Alluminium dengan Kaca Lengkap Terpasang (Type 2) Unit 1.00 958,550.00 958,550.00
Kusen Boven Alluminium dengan Kaca Lengkap Terpasang M2 1.60 958,550.00 1,533,680.00
Total 37,671,140.71
- Pekerjaan Lantai
Pasangan Lantai Granit Ukuran 60 x 60 cm M2 81.00 448,177.00 36,302,337.00
Pasangan Plint Granit Ukuran 10 x 60 cm M2 46.00 58,125.00 2,673,750.00
Pasangan Lantai Keramik Kamar Mandi Ukuran 20 x 20 cm M2 9.00 181,646.00 1,634,814.00
Pasangan Dinding Keramik Kamar Mandi Ukuran 20 x 20 cm M2 25.54 181,646.00 4,639,238.84
Total 45,250,139.84
- Pekerjaan Penutup Plafond
Pemasangan Rangka Plafond M2 81.00 111,838.00 9,058,878.00
Pemasangan Penutup Plafond Gypsum Board M2 81.00 47,105.00 3,815,505.00
Pemasangan List Plafond M 46.00 16,282.00 748,972.00
Pengecetan Plafond M2 81.00 58,331.00 4,724,811.00
Total 18,348,166.00
- Pekerjaan Penutup Atap
Pemasangan Rangka Rangka Atap Baja Ringan M2 161.00 284,723.00 45,840,403.00
Pemasangan Atap Genteng Metal M2 161.00 275,692.00 44,386,412.00
Pemasangan List Plank GRC Ukuran 0,04 x 20 cm M 38.00 46,618.00 1,771,484.00
Total 91,998,299.00
Total Pekerjaan Arsitektur 302,390,608.67
HARGA SATUAN HARGA SATUAN
NO. URAIAN PEKERJAAN SATUAN VOLUME
(Rp.) PEKERJAAN (Rp.)
1 2 3 4 5
Total 27,172,000.00
Total Pekerjaan Mekanikal dan Elektrikal 81,111,743.60
1 2 3
JUMLAH 150,550,768.24
PPN 10% 15,055,076.82
JUMLAH TOTAL 165,605,845.06
JUMLAH DIBULATKAN 165,600,000.00
…................................ …..................................
Team Leader
RENCANA ANGGARAN BIAYA PEMBANGUNAN RUANG GENSET
I Pekerjaan Persiapan
- Pembuatan Papan Nama Proyek Ls 600,000.00 -
- Mobilisasi dan Demobilisasi Ls 23,900,000.00 -
- Pemasangan Bowplank M 47,979.00 -
- Keselamatan Kenyamanan Kerja Ls 21,300,000.00 -
Total -
I Pekerjaan Struktur
- Pekerjaan Tanah
Galian Tanah Keras M3 12.32 140,070.00 1,725,662.40
Urugan Tanah Kembali M3 5.50 25,264.00 138,952.00
Urugan Pasir Sirtu M3 6.00 293,980.00 1,763,880.00
Total 3,628,494.40
- Pekerjaan Pondasi
Pasangan Batu Kosong (Anstamping) M3 1.76 344,357.00 606,068.32
Urugan Pasir M3 0.88 309,074.00 271,985.12
Pasangan Batu Karang/Batu Kali Campuran 1 PC : 4 PP M3 6.93 896,710.00 6,214,200.30
Total 7,092,253.74
- Pekerjaan Beton
Sloft Beton Bertulang Ukuran 10 x 15 cm M 22.00 158,482.00 3,486,604.00
Kolom Praktis Beton Bertulang Ukuran 11 x 11 cm M 14.00 130,878.00 1,832,292.00
Rink Balk Beton Bertulang Ukuran 10 x 15 cm M 22.00 158,482.00 3,486,604.00
Total 8,805,500.00
Total Pekerjaan Struktur 19,526,248.14
II Pekerjaan Arsitektur
- Pekerjaan Tembok
Pasangan Dinding Batako Campuran 1 PC : 4 PP M2 71.05 471,430.00 33,495,101.50
Plesteran Tebal 1,5 cm Campuran 1 PC : 3 PP M2 142.10 65,236.00 9,270,035.60
Acian M2 142.10 35,958.00 5,109,631.80
Pengecetan M2 142.10 58,331.00 8,288,835.10
Total 56,163,604.00
- Pekerjaan Kusen Pintu Jendela dan Daun Pintu Jendela
Pintu Plat Besi Unit 42.00 244,201.00 10,256,442.00
Kusen Boven Alluminium M 12.40 244,201.00 3,028,092.40
Daun Boven Alluminium dengan Kaca Unit 6.00 958,550.00 5,751,300.00
Total 19,035,834.40
- Pekerjaan Lantai
Beton Lantai Dasar K-100 M3 0.90 1,032,775.00 929,497.50
Beton Lantai Mutu K-250 M3 2.10 1,249,812.00 2,624,605.20
Total 3,554,102.70
- Pekerjaan Penutup Atap
Pemasangan Rangka Rangka Atap Baja Ringan M2 81.48 284,723.00 23,199,230.04
Pemasangan Atap Genteng Metal M2 81.48 275,692.00 22,463,384.16
Pemasangan List Plank GRC Ukuran 0,04 x 20 cm M 33.60 46,618.00 1,566,364.80
Total 47,228,979.00
Total Pekerjaan Arsitektur 125,982,520.10
HARGA SATUAN HARGA SATUAN
NO. URAIAN PEKERJAAN SATUAN VOLUME
(Rp.) PEKERJAAN (Rp.)
1 2 3 4 5
Total 5,042,000.00
Total Pekerjaan Mekanikal dan Elektrikal 5,042,000.00
1 2 3
JUMLAH 67,248,577.95
PPN 10% 6,724,857.79
JUMLAH TOTAL 73,973,435.74
JUMLAH DIBULATKAN 73,900,000.00
…................................ …..................................
Team Leader
RENCANA ANGGARAN BIAYA PEMBANGUNAN POS PENJAGAAN
1 2 3
JUMLAH 708,662,846.00
PPN 10% 70,866,284.60
JUMLAH TOTAL 779,529,130.60
JUMLAH DIBULATKAN 779,500,000.00
…................................ …..................................
Team Leader
BACK UP VOLUME PEKERJAAN
INSTANSI : KEMENTERIAN PERHUBUNGAN
PEKERJAAN : 0
LOKASI : KABUPATEN MANGGARAI TIMUR
TAHUN ANGGARAN : 2022
BERAT SATU
NO KETERANGAN SKETSA PANJANG LEBAR TINGGI TEBAL JUMLAH RATA2 LUAS VOLUME
JENIS AN
a Pekerjaan Tanah
Galian Tanah Keras 500.00 0.80 0.50 200.00 m3
Urugan Tanah Kembali 500.00 2.00 0.06 60.00 m3
b Pekerjaan Pondasi
Urugan Pasir 500.00 0.80 0.05 20.00 m3
Pasangan Batu Kosong 500.00 0.80 0.10 40.00 m3
Pasangan Batu Kali/Karang Campuran 1 PC : 4 PP 500.00 0.32 157.50 m3
Sloft Ukuran 10 x 15 cm 500.00 500.00 m
Beton Mutu FC = 7,4 MPa (K-100), Slump (12±2) 500.00 0.02 0.55 0.20 200.00 0.44 m3
Hidran 2 m 3
Pipa Over Flow Ø 25 mm
Pipa Inlet Ø 25 mm
1.8 0
2.80
III
1.90
1.80
1.00
Kran tab Ø 20 mm
3.40
0.10 0.10
A
Denah HU
Skala 1 : 50
BERAT SATU
NO KETERANGAN SKETSA PANJANG LEBAR TINGGI TEBAL JUMLAH RATA2 LUAS VOLUME
JENIS AN
A
Hidran 2 m 3
Pipa Over Flow Ø 25 mm
1.60
2.00
2.80
3.40
0.10 0.10
A
Denah HU
Skala 1 : 50
0.40
0.20
Packing karet
Beton Tumbuk 1:3:5
Nipple Ø 20 mm
0.20 Dinding fiber glass
Beton Tumbuk 1:3:5
0.22
0.20
0.65
Pasangan
batu kali 1:4
0.10
0.20
0.68
Sub
No Uraian Panjang Lebar Tinggi Tebal Luas 1 Luas 2 Jumlah 1 Jumlah 2 Volume Satuan
Volume
1 2 3 4 5 6 7 8 9 10 11.00 12 13
2 Pekerjaan Pondasi
Urugan Pasir 750.00 1.00 0.05 37.50 m3
Pasangan Batu Kosong (Anstamping) 750.00 1.00 0.10 75.00 m3
Pasangan Batu Kali/Karang Campuran 1 PC : 4 PP 750.00 0.39 288.75 m3
Total 296,342,062.50
- Pekerjaan Struktur Pagar
Sloft Beton Bertulang Ukuran 10 x 15 cm M 750.00 158,482.00 118,861,500.00
Rink Balk Tengah Beton Bertulang Ukuran 10 x 15 cm M 750.00 158,482.00 118,861,500.00
Kolom Praktis Beton Bertulang Ukuran 11 x 11 cm M 1,004.00 130,878.00 131,401,512.00
Rink Balk Atas Beton Bertulang Ukuran 10 x 15 cm M 750.00 158,482.00 118,861,500.00
Total 487,986,012.00
- Pekerjaan Pagar Tembok (t=4 meter)
Pasangan Dinding Batako Campuran 1 PC : 4 PP M2 2,980.00 471,430.00 1,404,861,400.00
Plesteran Tebal 1,5 cm Campuran 1 PC : 3 PP M2 5,960.00 65,236.00 388,806,560.00
Acian M2 5,960.00 35,958.00 214,309,680.00
Pengecetan M2 5,960.00 58,331.00 347,652,760.00
Total 2,355,630,400.00
Total Pekerjaan Pondasi Pagar 2,726,712,962.50
II Gapura dan Gerbang
- Pekerjaan Struktur Gapura
Kolom Praktis Beton Bertulang Ukuran 11 x 11 cm M 7.80 130,878.00 1,020,848.40
Kolom Struktur Beton dengan Mutu FC : 14,5 Mpa (K-175), Slump (12±2) M3 0.73 1,188,935.00 866,733.62
Pembesian Kg 34.30 17,619.58 604,372.58
Bekisting M2 4.86 214,791.00 1,043,884.26
Pasangan Batu Kali/Karang Campuran 1 PC : 4 PP M3 3.06 896,710.00 2,743,932.60
Plesteran Tebal 1,5 cm Campuran 1 PC : 3 PP M2 7.74 65,236.00 504,926.64
Acian M2 7.74 35,958.00 278,314.92
Pengecetan M2 7.74 58,331.00 451,481.94
Total 7,514,494.96
- Gerbang dan Papan Nama Gapura
Papan Nama Gapura Ls 1.00 1,600,000.00 1,600,000.00
Gerbang Gapura 2 Pintu (L= 5 Meter) Ls 1.00 10,000,000.00 10,000,000.00
Total 11,600,000.00
Total Pekerjaan Gerbang dan Gapura (1 Pintu) 19,114,494.96
Total Pekerjaan (3 Pintu) 57,343,484.87
I Pekerjaan Struktur
- Pekerjaan Tanah
Galian Tanah Keras M3 750.00 117,462.00 88,096,500.00
Urugan Tanah Kembali M3 225.00 25,264.00 5,684,400.00
Urugan Pasir Sirtu M3 120.00 293,980.00 35,277,600.00
Total 129,058,500.00
Total 515,251,890.75
- Pekerjaan Beton
Beton Lantai Kerja Dengan Mutu FC = 16,9 MPa (K-200), SLUMP (120±20) M 37.50 1,216,076.00 45,602,850.00
Beton Foot Plat dengan Mutu FC : 21,7 Mpa (K-250), Slump (120±20) M 75.00 1,249,812.00 93,735,900.00
Total 139,338,750.00
Total Pekerjaan Struktur 783,649,140.75
II Pekerjaan Pembongkaran
- Pekerjaan Pembongkaran
Pembongkaran Beton Eksisting M3 75.00 357,506.00 26,812,950.00
Total 26,812,950.00
Total Pekerjaan Pembongkaran 26,812,950.00
TOTAL PEKERJAANREHABILITASI KAKI DERMAGA
I - Pekerjaan Struktur 783,649,140.75
II - Pekerjaan Pembongkaran 26,812,950.00
Total Pekerjaaan Rehabilitasi Kaki Dermaga 810,462,090.75
RENCANA ANGGARAN BIAYA PEMBANGUNAN LAPANGAN PENUMPUKAN
I Pekerjaan Struktur
- Pekerjaan Tanah
Galian Tanah Keras M3 1,500.00 117,462.00 176,193,000.00
Urugan Tanah Kembali M3 750.00 25,264.00 18,948,000.00
Urugan Pasir Sirtu M3 500.00 293,980.00 146,990,000.00
Total 342,131,000.00
Total 687,002,521.00
- Pekerjaan Beton
Beton Lantai Kerja Dengan Mutu FC = 16,9 MPa (K-200), SLUMP (120±20) M 125.00 1,216,076.00 152,009,500.00
Beton Foot Plat dengan Mutu FC : 21,7 Mpa (K-250), Slump (120±20) M 250.00 1,249,812.00 312,453,000.00
Total 464,462,500.00
Total Pekerjaan Struktur 1,493,596,021.00
II Pekerjaan Pembongkaran
- Pekerjaan Pembongkaran
Pembongkaran Beton Eksisting M3 100.00 357,506.00 35,750,600.00
Total 35,750,600.00
Total Pekerjaan Pembongkaran 35,750,600.00
TOTAL PEKERJAANREHABILITASI KAKI DERMAGA
I - Pekerjaan Struktur 1,493,596,021.00
II - Pekerjaan Pembongkaran 35,750,600.00
Total Pekerjaaan Rehabilitasi Kaki Dermaga 1,529,346,621.00
DAFTAR HARGA SATUAN
PEKERJAAN : KEMENTERIAN PERHUBUNGAN
LOKASI : KABUPATEN MANGGARAI TIMUR
TAHUN : 2022
HARGA SATUAN
NO. KODE URAIAN PEKERJAAN SATUAN
(Rp.)
1 A PEKERJAAN PERSIAPAN
PEMBUATAN PAPAN NAMA PROYEK UNIT 600,000.00
PEMASANGAN BOUWPLANK M' 47,979.00
MOBILISASI DAN DEMOBILISASI LS 23,900,000.00
DOKUMENTASI, ADMINISTRASI DAN PELAPORAN LS 3,700,000.00
KESELAMATAN KENYAMANAN KERJA (K3) LS 21,300,000.00
2 B PEKERJAAN TANAH
GALIAN TANAH BIASA (MRNGGUNAKAN ALAT BERAT) M3 57,798.00
GALIAN TANAH BIASA (MANUAL) M3 67,922.00
GALIAN 1 M3 TANAH KERAS (MRNGGUNAKAN ALAT BERAT) M3 117,462.00
GALIAN 1 M3 TANAH KERAS (MANUAL) M3 140,070.00
TIMBUNAN TANAH KEMBALI M3 25,264.00
1 M3 PEMADATAN TANAH DAN TIMBUNAN TANAH UNTUK TANGGUL M3 72,636.00
1 M3 URUGAN PASIR M3 309,074.00
1 M3 URUGAN PASIR SIRTU M3 293,980.00
1 M3 URUGAN PASIR M3 309,074.00
1 M3 URUGAN TANAH HITAM M3 102,436.00
STRIPING 1 M3 STRIPING TANAH M3 17,409.00
3 C PEKERJAAN PASANGAN
PASANGAN BATU KOSONG (Anstamping) M3 344,357.00
PASANGAN 1 M2 DINDING CONBLOCK HB20 CAMPURAN 1SP : 4 PP M2 475,648.00
PASANGAN 1 M3 PONDASI BATU KARANG/KALI CAMPURAN 1PC : 3PP M3 1,032,803.00
PASANGAN 1 M3 PONDASI BATU KARAGN/KALI CAMPURAN 1PC : 4PP M3 896,710.00
1 M2 PLESTERAN TEBAL 1,5 CM, DENGAN CAMPURAN 1 PC : 3 PS M2 65,236.00
1 M2 PLESTERAN TEBAL 1,5 CM, DENGAN CAMPURAN 1 PC : 5 PS M2 62,984.00
1 M2 ACIAN M2 35,958.00
1 M2 PENGECATAN TEMBOK BARU (1 x PLAMIR, 1 x CAT DASAR, 2 x CAT
M2 58,331.00
PENUTUP)
1 M2 PEMASANGAN IJUK TEBAL 10 CM M2 49,594.00
PEMASANGAN 1 BUAH KLOSET DUDUK UNIT 2,453,043.00
PEMASANGAN 1 BUAH KLOSET JONGKOK UNIT 1,213,838.00
PEMASANGAN BATU ALAM/CANDI (1M2) M2 161,198.00
PASANGAN 1M2 LEMPENGAN RUMPUT M2 66,988.00
PEMASANGAN BATA ROSSTER M3 693,246.00
PEMASANGAN BERONJONG UKURAN 2 x 1 x 0.5 m M3 1,384,803.00
PASANGAN 1 M2 DINDING BATAKO 1SP : 4 PP M2 471,430.00
PASANGAN 1 M2 DINDING BATA MERAH (5x11x22 cm) CAMPURAN 1SP : 4 PP M2 218,152.00
PASANGAN 1 M PAGAR BRC 6 Ø MM, TINGGI 120 M 280,932.00
MEMBUAT 1 M' SLOOF DAN RINK BALK BETON BERTULANG UKURAN 10 X 15 CM M 158,482.00
PEMBUATAN DAN PEMASANGAN 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS II M3 7,548,290.00
PEMBUATAN DAN PEMASANGAN 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS I M3 12,693,827.00
7 G PEKERJAAN PLAFOND
PEMASANGAN 1 M2 TRIPLEKS UKURAN (120x240) CM, TEBAL 6 MM M2 50,486.00
PEMASANGAN 1 M LIST LANGIT-LANGIT KAYU PROFIL M 16,282.00
PEMASANGAN 1 M2 RANGKA PLAFOND M2 111,838.00
PEMASANGAN 1 M2 LANGIT-LANGIT LAMBRISERING KAYU, TEBAL 9 MM M2 233,459.00
PEMASANGAN STOP KONTAK UNIT 120,750.00
PEKERJAAN PEMASANGAN KABEL NYM SUPRIME 2 X 10 M 54,050.00
PEMASANGAN LAMPU SL PHILIP 20 WATT UNIT 103,500.00
PEMASANGAN 1 M2 LANGIT-LANGIT GYPSUM BORD UKURAN (120x240x9) M2 47,105.00
8 H PEKERJAAN KERAMIK
PEMASANGAN 1 M2 LANTAI KERAMIK UKURAN 30 x 30 CM M2 182,013.00
PEMASANGAN 1 M2 LANTAI KERAMIK UKURAN 20 x 20 CM M2 181,646.00
PEMASANGAN 1 M2 LANTAI GRANIT UKURAN 60 x 60 CM M2 448,177.00
PEMASANGAN 1 M2 LANTAI GRANIT UKURAN 30 x 60 CM M2 379,177.00
PEMASANGAN 1 M' PLINT LANTAI UKURAN 10 x 60 CM M 58,125.00
PEMASANGAN 1 M2 LANTAI PARQUET KAYU UK. 1.2 CM x 5 CM x 25 CM M2 528,912.00
PEMASANGAN 1 M' STEP NOZING TANGGA UK. 10 x 60 CM M 54,066.00
9 I PEKERJAAN PAVING
1 M2 PEMASANGAN PAVING BLOCK M2 202,300.00
10 J PEKERJAAN PEMBONGKARAN
PEMBONGKARAN 1 M3 PASANGAN BATU (MANUAL) M3 183,616.00
PEMBONGKARAN 1 M3 PASANGAN BATA MERAH/BATAKO (MANUAL) M3 65,470.00
PEMBONGKARAN 1 M3 BETON SECARA KONVENSIONAL M3 357,506.00
12 L PEKERJAAN KAYU
PEKERJAAN KAYU PENYANGGA KOLOM 6/12 CM M3 5,034,318.00
15 O PEKERJAAN JALAN
PEKERJAAN 1 M3 PONDASI BAWAH (TELFORD) M3 295,748.00
PEKERJAAN 1M3 LAPIS PONDASI AGREGAT KELAS B M3 490,182.00
PEKERJAAN LAPIS PERMUKAAN PENETRASI MACADAM TEBAL 5 CM M3 1,965,708.00
PEKERJAAN LAPIS PERESAP PENGIKAT - ASPAL CAIR LITER 11,627.00
DAFTAR HARGA SATUAN DASAR TENAGA KERJA, BAHAN DAN PERALATAN
1 2 3 4
1 Pekerja OH 75,400.00
2 Tukang OH 97,670.00
3 Kepala Tukang OH 116,400.00
4 Mandor OH 121,000.00
5 Juru Ukur, Operator/Mekanik alat Berat OH 121,000.00
6 Pembantu Juru Ukur dan Operator/Mekanik alat Berat OH 75,400.00
7 Ahli Muda OH 450,000.00
8 Ahli Madya OH 650,000.00
9 Ahli Utama OH 1,000,000.00
10 Supir Truck OH 116,400.00
11 Supir Kendaraan < 2 ton (termasuk sedan) OH 116,400.00
12 Kenek OH 75,400.00
13 Penjaga Malam/Satpam OH 116,400.00
14 Drafter CAD/Manual OH 200,000.00
15 Desain Engineer OH 450,000.00
16 Operator Komputer/Printer/Ploter OH 116,400.00
II BAHAN / MATERIAL
A Bahan Material Non Sanitasi
1 Agregat B M3 299,000.00
2 Agregat Kasar M3 252,000.00
3 Agregat Halus M3 249,000.00
4 Aspal KG 12,000.00
5 Alluminium Strep M 15,000.00
6 Air Liter 16.00
7 Angker Baut dia. 16 mm - 40 mm Buah 50,000.00
8 Batu Alam M3 75,000.00
9 Batu Bata Buah 2,000.00
10 Batu Batako Buah 2,500.00
11 Batu Karang M3 160,964.91
12 Batu Kali M3 189,876.08
13 Bata Rosster M3 18,000.00
14 Besi Angker rod 16 mm, panjang 60 cm Buah 22,000.00
15 Besi Beton Ukuran Ø 6 mm Polos Kg 13,100.00
16 Besi Beton Ukuran Ø 8 mm Polos Kg 13,100.00
17 Besi Beton Ukuran Ø 10 mm Polos Kg 13,100.00
18 Besi Beton Ukuran Ø 13 mm Polos Kg 13,100.00
19 Besi Beton Ukuran Ø 16 mm Polos Kg 13,100.00
20 Besi Beugel U Buah 55,000.00
21 Besi Strip Kg 13,500.00
22 Besi Profil IWF DN SII Kg 14,200.00
23 Besi Profil CNP Kg 10,500.00
24 Besi Hollow 40.40.20 Batang 25,000.00
25 Bensin Non Subsidi Liter 9,000.00
26 Bensin Bersubsidi Liter 6,500.00
27 Cat Besi Kg 47,000.00
28 Cat Kayu Kg 35,000.00
29 Cat Meni Kg 30,000.00
30 Cat Dasar Kg 88,000.00
31 Cat Tembok Kg 120,000.00
32 Closet Duduk Unit 1,750,000.00
33 Closet Jongkok Unit 750,000.00
34 Cotton Plaster Buah 15,000.00
35 Compoun Zak 75,000.00
36 Copper Rod = 22/7 x(0.007)^2 x 1 x 7850 Kg 5,000.00
37 Cuka Bibit Liter 26,000.00
No Uraian Satuan Harga Satuan Dasar (Rp)
1 2 3 4
38 Dinabolt Buah 7,200.00
39 Engsel Pintu Besi Buah 65,000.00
40 Engsel Pintu Biasa Buah 25,000.00
41 Fisher Buah 3,000.00
42 Granit Ukuran 60 x 60 cm Buah 85,000.00
43 Granit Ukuran 30 x 60 cm Buah 46,666.67
44 Gebalan Rumput m2 45,000.00
45 Genteng Metal Lembar 162,000.00
46 Gypsum Board (120 x 240 x 9) cm Lembar 70,000.00
47 Hollow 4/4 Zincromate Batang 30,000.00
48 Ijuk Kg 5,000.00
49 Jaring Kawat Baja dilas Kg 20,000.00
50 Kabel Broko M 12,000.00
51 Kawat Beton / Bendrat Kg 15,000.00
52 Kawat Bronjong Set 881,250.00
53 Kawat Las Listrik Kg 15,000.00
54 Kawat Duri Kg 15,500.00
55 Kayu Balok Kelas I Ukuran 6/12 cm M3 7,350,000.00
56 Kayu Balok Kelas II Ukuran 6/12 cm M3 3,350,000.00
57 Kayu Balok Kelas II Ukuran 4/6 cm M3 3,350,000.00
58 Kayu Balok Kelas II Ukuran 8/16 cm M3 3,350,000.00
59 Kayu Balok Kelas II Ukuran 5/10 cm M3 3,350,000.00
60 Kayu Dolken Kelas II Ukuran 5/7 cm M3 3,490,000.00
61 Kayu Dolken Kelas II Ukuran 8/10 cm M3 3,490,000.00
62 Kayu Dolken Kelas II Ukuran 8/10 cm Batang 23,266.67
63 Kayu Papan Kelas II Ukuran 3/30 cm M3 3,350,000.00
64 Kayu Balok Kelas III Ukuran 5/10 cm M3 2,725,000.00
65 Kayu Papan Bekisting Kelas III Ukuran 3/30 cm M3 2,725,000.00
66 Kayu List Profil Plafond M 4,200.00
67 Kausen Buah 6,000.00
68 Kerikil 2-3 cm (per kg) M3 399,800.00
69 Kerikil 2-3 cm (per kg) kg 222.11
70 Kerikil 1-2 cm (per kg) M3 399,800.00
71 Kerikil 1-2 cm (per kg) kg 222.11
72 Keramik Ukuran 30 x 30 Buah 4,100.00
73 Keramik Ukuran 20 x 20 Buah 1,800.00
74 Kerosene Liter 5,000.00
75 Klem Sling Buah 21,000.00
76 Kusen Alumunium Natural Uk 4" M 181,320.00
77 Kunci Gembok Buah 120,000.00
78 Kunci Tanam Buah 145,000.00
79 Lampu Sl Philip 25 Watt Buah 20,000.00
80 Lampu Sodium 250 Watt Buah 300,000.00
81 Lem Kunign Kg 80,000.00
82 Lem Kayu Kg 67,000.00
83 Lem Lantai Parquet Kg 179,000.00
84 MCB,1P, 16 A Buah 40,000.00
85 Minyak Tanah Liter 27,000.00
86 Minyak Bekisting Liter 25,000.00
87 Minyak Pelumas Liter 20,000.00
88 Multiplex Tebal 0,6 cm Lembar 125,000.00
89 Multiplex Tebal 0,9 cm Lembar 135,000.00
90 Mur, Baut dan Skrup Buah 1,500.00
91 Mur, Baut dan Skrup Kg 45,000.00
92 Nok Genteng Metal Lembar 135,000.00
93 Pagar BRC dengan Tiang Lemabar 565,000.00
94 Paku Biasa 1 - 3 cm Kg 15,000.00
95 Paku Biasa 4 - 7 cm Kg 15,000.00
96 Paku Seng Gelombang Kg 25,000.00
97 Paku Gypsum Kg 17,000.00
98 Parquet Lantai Ukuran 1.2 cm x 5 cm x 25 cm m2 245,000.00
No Uraian Satuan Harga Satuan Dasar (Rp)
1 2 3 4
99 Pasir Beton (per m3) m3 393,156.86
100 Pasir Beton (per kg) kg 280.83
101 Pasir Pasang (per m3) M3 393,156.86
102 Pasir Pasang (per kg) kg 280.83
103 Pasir Urug (per m3) M3 194,800.00
104 Pasir Urug (per kg) M3 139.14
105 Paving Stone M2 130,000.00
106 Pintu Pagar BRC Unit 1,350,000.00
107 Pipa PVC dia 3" m 40,000.00
108 Plamir KG 20,000.00
109 Plat besi = 0.009x0.4x0.4x7850 M3 20,000.00
110 Plat GIP 200.120.6 mm Buah 15,000.00
111 Plat GIP 120.80.6 mm Buah 20,000.00
112 Plat GIP 350.120.6 mm Buah 25,000.00
113 Plint Lantai Ukuran 10 x 60 cm Buah 18,000.00
114 Porland Semen (PC/ Zak) Zak 49,805.61
115 Porland Semen (PC 40 Kg / Zak) Kg 1,245.14
116 Profil C-75 M 15,500.00
117 Olie Mesin (Mesran 40 SAE) Liter 37,000.00
118 Reng M 12,000.00
119 Reinforcing Steel deform = 56 x 1.05 Kg 15,000.00
120 Rock Wool Board 120 x 60 cm Lembar 84,000.00
121 Roster Buah 7,000.00
122 Stop Kontak Broko Standard (1 Phase) Buah 35,000.00
123 Skrup Fixer Buah 400.00
124 Sirtu M3 215,000.00
125 Seng Gelombang BJLS - 30 Lembar 65,000.00
126 Seng Pelat Lembar 40,000.00
127 Screen 4'' low Carbon Buah 750,000.00
128 Screen 6'' low Carbon Buah 150,000.00
129 Screen 8'' low Carbon Buah 3,250,000.00
130 Scaner Buah 15,000.00
131 Sealant Tube 65,000.00
132 Sling Baja Ø 16 mm M 25,700.00
133 Sling Baja Ø 12 mm M 16,200.00
134 Span skrup 16mm Buah 31,000.00
135 Solar Non Subsidi Liter 9,000.00
136 Solar Bersubsidi Liter 6,600.00
137 Step Nozing Tangga Ukuran 10 x 60 Buah 16,000.00
138 Talang/Jurai Canai Dingin M 20,000.00
139 Tanah Hitam m3 56,000.00
140 Teakwood 3 mm 120 x 240 Lembar 200,000.00
141 Teakwood 4 mm 120 x 240 Lembar 112,000.00
142 Tiang lampu type Dual, Lighting Pole Galvanis, H=11 Unit 16,200,000.00
143 Tripleks T = 3 mm Lembar 65,000.00
144 Wallpaper M2 95,000.00
145 Atap Spandek Zincalume M2 55,000.00
146 Screw Cteks 12 - 4 x 50 Bh 1,200.00
147 Screw Cteks 10 x 16 - 16 Bh 750.00
148 GRC, Tebal 4 mm Lbr 90,000.00
No Uraian Satuan Harga Satuan Dasar (Rp)
1 2 3 4
B Bahan Material Sanitasi
1 2 3 4
47 Knee GIP. Ǿ 100 mm - 90 Bh 101,955.00
48 Knee GIP. Ǿ 100 mm - 45 Bh 90,982.50
49 Knee GIP. Ǿ 100 mm - 22,50 Bh 78,640.00
50 Knee GIP. Ǿ 100 mm - 11,25 Bh 75,600.00
51 Knee GIP. Ǿ. 75 mm - 90 Bh 59,587.50
52 Knee GIP. Ǿ 75 mm - 45 Bh 50,190.00
53 Knee GIP. Ǿ 75 mm - 22,50 Bh 48,300.00
54 Knee GIP. Ǿ 75 mm - 11,25 Bh 48,300.00
55 Knee GIP. Ǿ 50 mm - 90 Bh 38,500.00
56 Knee GIP. Ǿ 50 mm - 45 Bh 38,500.00
57 Knee GIP. Ǿ 50 mm - 22,5 Bh 38,500.00
58 Knee GIP. Ǿ 50 mm - 11,25 Bh 38,500.00
59 Knee GIP. Ǿ 40 mm Bh 18,750.00
60 Knee GIP. Ǿ 25 mm Bh 16,500.00
61 Knee GIP. Ǿ 20 mm Bh 6,500.00
62 Knee GIP. Ǿ 15 mm Bh 5,000.00
63 Water Meter All Flange Ǿ 200 mm Bh 21,480,000.00
64 Water Meter All Flange Ǿ 150 mm Bh 6,500,000.00
65 Water Meter All Flange Ǿ 100 mm Bh 4,000,000.00
66 Water Meter All Flange Ǿ 75 mm Bh 2,250,000.00
67 Water Meter All Flange Ǿ 50 mm Bh 1,500,000.00
68 Water Meter All Flange Ǿ 40 mm Bh 415,000.00
69 Water Meter All Flange Ǿ 25 mm Bh 350,000.00
70 Water Meter All Flange Ǿ 20 mm Bh 265,650.00
71 Water Meter All Flange Ǿ 15 mm Bh 250,000.00
72 Giboult Joint CI. Ǿ 200 mm Bh 379,200.00
73 Giboult Joint CI. Ǿ 160/150 mm Bh 310,000.00
74 Giboult Joint CI. Ǿ 110/100 mm Bh 176,820.00
75 Giboult Joint CI. Ǿ 90/75 mm Bh 134,820.00
76 Giboult Joint CI. Ǿ 63/50 mm Bh 88,830.00
77 Giboult Joint CI. Ǿ 32/25 mm Bh 65,830.00
78 Tee All Flange Ǿ200 x 200 x 200 mm Bh 810,000.00
79 Tee All Flange CI Ǿ 200 x 200 x 100 mm Bh 712,800.00
80 Tee All Flange CI Ǿ 200 x 200 x 75 mm Bh 698,400.00
81 Tee All Flange CI Ǿ 150 x 150 x 150 mm Bh 464,310.00
82 Tee All Flange CI Ǿ 150 x 150 x 100 mm Bh 421,785.00
83 Tee All Flange CI Ǿ 150 x 150 x 75 mm Bh 410,200.00
84 Tee All Flange CI Ǿ 150 x 150 x 50 mm Bh 400,680.00
85 Tee All Flange Ǿ100 x 100 x 100 mm Bh 304,600.00
86 Tee All Flange Ǿ100 x 100 x 75 mm Bh 286,086.00
87 Tee All Flange Ǿ100 x 100 x 50 mm Bh 258,912.00
88 Tee All Flange Ǿ Ǿ 75 x 75 x 75 mm Bh 276,400.00
89 Tee All Flange Ǿ 75 x 75 x 50 mm Bh 268,002.00
90 Tee All Flange Ǿ 50 x 50 x 50 mm Bh 224,800.00
91 Tee All Flange Ǿ 50 x 50 x 25 mm Bh 184,800.00
92 Tee All Flange Ǿ 50 x 25 x 25 mm Bh 176,000.00
93 Tee All Socket GIP. Ǿ 75 x 75 x 75 mm Bh 104,600.00
94 Tee All Socket GIP. Ǿ 50 x 50 x 50 mm Buah 35,831.00
95 Tee All Socket GIP. Ǿ 50 x 50 x 25 mm Buah 35,831.00
96 Tee GIP. Ǿ 20 x 20 x 20 mm Bh 4,882.50
97 Tee GIP. Ǿ 15 mm Bh 6,000.00
98 Tee GIP. Ǿ 20 mm Bh 8,500.00
99 Tee GIP. Ǿ 25 mm Bh 13,000.00
100 Tee GIP. Ǿ 40 mm Bh 25,000.00
101 Tee GIP. Ǿ 50 mm Bh 37,000.00
102 Tee GIP. Ǿ 75 mm Bh 111,000.00
103 Tee GIP. Ǿ 100 mm Bh 202,000.00
104 Tee GIP. Ǿ 150 x 100 mm Bh 280,000.00
105 Tee GIP. Ǿ 75 x 50 mm Bh 128,500.00
106 Tee GIP. Ǿ 40 x 50 mm Bh 57,500.00
107 Tee GIP. Ǿ 50 x 25 mm Bh 52,500.00
108 Tee GIP. Ǿ 50 x 20 mm Bh 50,000.00
109 Tee GIP. Ǿ 25 x 40 mm Bh 37,500.00
110 Tee GIP. Ǿ 40 x 20 mm Bh 35,000.00
111 Tee GIP. Ǿ 40 x 15 mm Bh 30,800.00
112 Tee GIP. Ǿ 25 x 20 mm Bh 17,500.00
113 Tee GIP. Ǿ 25 x 15 mm Bh 10,250.00
114 Tee GIP. Ǿ 75 x 75 mm Bh 10,750.00
115 Tee GIP. Ǿ 50 x 50 mm Bh 35,900.00
No Uraian Satuan Harga Satuan Dasar (Rp)
1 2 3 4
116 Tee GIP. Ǿ 25 x 25 mm Bh 12,600.00
117 Tee GIP. Ǿ 15 x 15 mm Bh 8,000.00
118 Tee GIP. Ǿ 20 x 20 mm Bh 5,400.00
119 Tutupan Manhole Bh 1,275,000.00
120 Cheeck Valve All Flange PN.10 Ǿ 200 mm Bh 4,493,000.00
121 Cheeck Valve All Flange PN.10 Ǿ 150 mm Bh 3,865,000.00
122 Cheeck Valve All Flange PN.10 Ǿ 100 mm Bh 2,468,000.00
123 Cheeck Valve All Flange PN.10 Ǿ 75 mm Bh 1,968,000.00
124 Clamp Sadle Ǿ 100 mm X 50 mm Bh 165,000.00
125 Clamp Sadle Ǿ 75 mm X 25 mm Bh 137,500.00
126 Clamp Sadle Ǿ 50 mm X 25 mm Bh 95,000.00
127 Gate Valve All Flange PN.10 Ǿ 200 mm Bh 3,884,000.00
128 Gate Valve All Flange PN.10 Ǿ 150 mm Bh 2,900,000.00
129 Gate Valve All Flange PN.10 Ǿ 100 mm Bh 2,700,000.00
130 Gate Valve All Flange PN.10 Ǿ 75 mm Bh 1,910,000.00
131 Gate Valve All Flange PN.10 Ǿ 50 mm Bh 1,300,000.00
132 Gate Valve All Flange PN.10 Ǿ 25 mm Bh 875,000.00
133 Single Air Valve Flange Ǿ 100 mm Bh 1,750,000.00
134 Single Air Valve Flange Ǿ 75 mm Bh 1,350,000.00
135 Single Air Valve Flange Ǿ 50 mm Bh 1,150,000.00
136 Single Air Valve Threaded Ǿ 25 mm Bh 650,000.00
137 Plugh Valve Ǿ 15 mm Bh 75,000.00
138 Screen Flange Ǿ 150 mm Bh 1,160,000.00
139 Screen Flange Ǿ 100 mm Bh 850,000.00
140 Stop Kran Ǿ 15 mm Bh 47,787.75
141 Stop Kran Ǿ 20 mm Bh 50,000.00
142 Stop Kran Ǿ 25 mm Bh 75,000.00
143 Stop Kran Ǿ 50 mm Bh 300,000.00
144 Stop Kran Ǿ 75 mm Bh 850,000.00
145 Stop Kran Ǿ 100 mm Bh 1,250,000.00
146 Stup Flange Ǿ 160 mm Bh 620,000.00
147 Stup Flange Ǿ 110 mm Bh 546,000.00
148 Stup Flange Ǿ 90 mm Bh 362,000.00
149 Stup Flange Ǿ 63 mm Bh 265,000.00
150 Kran Pelampung Bh 75,000.00
Flange socket/Flange Drat GIP. Dia 75 mm Bh 144,000.00
Flange socket/Flange Drat GIP. Dia 50 mm Bh 108,000.00
151 Flange Spigot GIP. Ǿ 200 mm Bh 347,700.00
152 Flange Spigot GIP. Ǿ 150 mm Bh 224,595.00
153 Flange Spigot GIP. Ǿ 100 mm Bh 141,750.00
154 Flange Spigot GIP. Ǿ 75 mm Bh 97,070.00
155 Flange Spigot GIP. Ǿ 50 mm Bh 66,770.00
156 Flange Threaded GIP. Ǿ 150 mm Bh 108,863.75
157 Flange Threaded GIP. Ǿ 100 mm Bh 71,640.00
158 Flange Threaded GIP. Ǿ 75 mm Bh 62,208.00
159 Flange Threaded GIP. Ǿ 50 mm Bh 55,566.25
160 Wall Pipa GIP. Ǿ 200 mm - 50 cm Bh 837,000.00
161 Wall Pipa GIP. Ǿ 100 mm - 200 cm Bh 763,931.00
162 Wall Pipe GIP. Ø 100 mm - 100 cm Bh 426,000.00
163 Wall Pipa GIP. Ǿ 100 mm - 50 cm Bh 258,480.00
164 Wall Pipa GIP. Ǿ 75 mm - 200 cm Bh 763,931.00
165 Wall Pipa GIP. Ǿ 50 mm - 200 cm Bh 297,152.00
166 Wall Pipa GIP. Ǿ 150 mm - 50 cm Bh 567,801.00
167 Wall Pipa GIP. Ǿ 150 mm - 100 cm Bh 822,704.00
168 Wall Pipa GIP. Ǿ 150 mm - 180 cm Bh 1,398,596.80
169 Wall Pipa GIP. Ǿ 50 mm - 50 cm Bh 126,800.00
170 Waterstop lebar 200 mm M 93,000.00
171 Lose Flange Ǿ 200 mm Bh 145,000.00
172 Lose Flange Ǿ 150 mm Bh 98,600.00
173 Lose Flange Ǿ 100 mm Bh 54,240.00
174 Lose Flange Ǿ 50 mm Bh 32,400.00
175 Fiber Tank Kap. 2 m3 Buah 3,150,000.00
176 Coupler/Coupling Ø 110 mm Buah 986,000.00
177 Coupler/Coupling Ø 90 mm Buah 467,000.00
178 Coupler/Coupling Ø 63 mm Buah 196,000.00
179 Dop Ǿ 150 mm Bh 131,000.00
180 Dop/Kop dia 100 mm Bh 82,500.00
181 Dop/Kop dia 75 mm Bh 48,000.00
182 Dop/Kop dia 50 mm Bh 20,000.00
No Uraian Satuan Harga Satuan Dasar (Rp)
1 2 3 4
183 Dop/Kop dia 40 mm Bh 13,000.00
184 Dop/Kop dia 25 mm Bh 8,500.00
185 Dop/Kop dia 20 mm Bh 5,000.00
186 Dop/Kop dia 15 mm Bh 4,000.00
187 End Cap Ǿ 110 mm Bh 986,000.00
188 End Cap Ǿ 90 mm Bh 467,000.00
189 End Cap Ǿ 63 mm Bh 186,000.00
190 Paking Karet Ǿ 200 mm Bh 17,400.00
191 Paking Karet Ǿ 150 mm Bh 13,800.00
192 Paking Karet Ǿ 100 mm Bh 12,442.00
193 Paking Karet Ǿ 75 mm Bh 9,919.00
No Uraian Satuan Harga Satuan Dasar (Rp)
1 2 3 4
194 Paking Karet Ǿ 50 mm Bh 6,731.00
195 Paking Karet Ǿ 40 mm Bh 5,531.00
196 Baut Moer 5/8 x 3 Metal + Ring Bh 5,850.00
197 Baut Moer 14 + Ring Bh 4,620.00
198 Angker Moer Baut Ø 16 mm - 25 cm Bh 8,000.00
199 Angker Moer Baut Ø 25 mm - 30 cm Bh 9,500.00
200 Clamp Pipa dari besi strip siku 40.40.2.5 mm Bh 56,000.00
201 Reducer 150 x 100 Bh 227,500.00
202 Reducer 75 x 50 Bh 70,000.00
203 Reducer 50 x 25 Bh 24,000.00
204 Reducer 40 x 25 Bh 18,000.00
205 Reducer 50 x 40 Bh 41,500.00
206 Reducer 40 x 20 Bh 17,000.00
207 Reducer 20 x 50 Bh 9,000.00
208 Reducer 20 x 15 mm Bh 6,200.00
209 Pipa Hawa Buah 750,000.00
210 Pipa PVC Dia 0,5" m' 6,720.00
211 Pipa PVC Dia 0,75" m' 7,833.00
212 Pipa PVC Dia 1" m' 9,030.00
213 Pipa PVC Dia 2" m' 11,823.00
214 Pipa PVC Dia 3" m' 26,554.50
215 Pipa PVC Dia 4" m' 33,537.00
216 Pipa PVC Dia 6" m' 41,666.67
217 Box Meter Bh 50,765.00
218 Tangga Besi Bh 350,000.00
219 Pintu Tralis Reservoir Bh 2,650,000.00
220 High Density Polyethylene (HDPE) Ǿ 315 mm m' 1,653,941.40
221 High Density Polyethylene (HDPE) Ǿ 250 mm m' 1,035,174.10
222 High Density Polyethylene (HDPE) Ǿ 150 mm m' 447,413.08
223 High Density Polyethylene (HDPE) Ǿ 110 mm m' 201,698.38
224 High Density Polyethylene (HDPE) Ǿ 90 mm m' 135,296.14
225 High Density Polyethylene (HDPE) Ǿ 63 mm m' 86,517.07
226 High Density Polyethylene (HDPE) Ǿ 32 mm m' 24,413.78
II PERALATAN
1 UPAH
Pekerja OH 0.5000 75,400.00 37,700.00
Tukang Kayu OH 0.5000 97,670.00 48,835.00
Kepala Tukang OH 0.0500 116,400.00 5,820.00
Mandor OH 0.0100 121,000.00 1,210.00
2 BAHAN
Tripleks LEMBAR 1.0000 65,000.00 65,000.00
Paku 5 dan cm KG 0.2500 15,000.00 3,750.00
Cat Kayu KG 1.0000 35,000.00 35,000.00
Cetak Baliho m2 3.0000 130,100.00 390,300.00
3 PERALATAN
1 UPAH
Pekerja OH 0.1000 75,400.00 7,540.00
Tukang Kayu OH 0.1000 97,670.00 9,767.00
Kepala Tukang OH 0.0100 116,400.00 1,164.00
Mandor OH 0.0050 121,000.00 605.00
2 BAHAN
Kayu Balok 5/7 M3 0.0012 2,725,000.00 3,270.00
Paku 2''-3'' KG 0.0200 15,000.00 300.00
Kayu Papan 3/20 M3 0.0070 2,725,000.00 19,075.00
3 PERALATAN
3 DIREKSI
Direksi Kit LS 1.0000 7,000,000.00 7,000,000.00
Gudang Sementra dan Barak LS 1.0000 5,500,000.00 5,500,000.00
1 UPAH
Pekerja OH 0.2000 75,400.00 15,080.00
Tukang Kayu OH 0.3000 97,670.00 29,301.00
Kepala Tukang OH 0.0200 116,400.00 2,328.00
Mandor OH 0.0200 121,000.00 2,420.00
2 BAHAN
Pipa GIP Ø 1,5 inci Medium B M’ 2.0000 61,600.00 123,200.00
Kawat duri M’ 6.0000 15,500.00 93,000.00
Besi Beton Ø 6 mm Kg 0.1110 13,100.00 1,454.10
3 PERALATAN
2 PELAPORAN
Laporan Rencana Mutu Kontrak LS 1.0000 250,000.00 250,000.00
Laporan Bulanan LS 1.0000 250,000.00 250,000.00
Laporan Mingguan LS 1.0000 250,000.00 250,000.00
Laporan Harian LS 1.0000 250,000.00 250,000.00
Laporan Dokumentasi LS 1.0000 250,000.00 250,000.00
3 K3
Helm UNIT 60.0000 63,500.00 3,810,000.00
Rompi UNIT 60.0000 43,000.00 2,580,000.00
Sepatu Safety UNIT 60.0000 125,000.00 7,500,000.00
masker UNIT 60.0000 46,500.00 2,790,000.00
Sarung tangan UNIT 120.0000 15,500.00 1,860,000.00
1 UPAH
Pekerja OH 0.1107 75,400.00 8,346.78
Mandor OH 0.0554 121,000.00 6,703.40
2 BAHAN
3 PERALATAN
Excavator 0,8 m3 Jam 0.0554 617,490.00 34,208.95
Alat Bantu Jam 1.0000 1,000.00 1,000.00
1 UPAH
Pekerja OH 0.6750 75,400.00 50,895.00
Mandor OH 0.0675 121,000.00 8,167.50
2 BAHAN
3 PERALATAN
1 UPAH
Pekerja OH 0.0328 75,400.00 2,473.12
Mandor OH 0.0066 121,000.00 798.60
2 BAHAN
3 PERALATAN
Excavator & Hid. Breaker 1.3 ton Jam 0.1148 691,260.00 79,356.65
Excavator, 0.8 m³ Jam 0.0316 617,490.00 19,512.68
1 UPAH
Pekerja OH 1.3920 75,400.00 104,956.80
Mandor OH 0.1392 121,000.00 16,843.20
2 BAHAN
3 PERALATAN
1 UPAH
Pekerja OH 0.3300 75,400.00 24,882.00
Mandor OH 0.0330 121,000.00 3,993.00
2 BAHAN
3 PERALATAN
1 UPAH
Pekerja OH 0.1311 75,400.00 9,884.94
Mandor OH 0.0025 121,000.00 302.50
2 BAHAN
3 PERALATAN
Vibrator Roller Jam 0.0302 510,000.00 15,402.00
Excavator, 0.8 m³ Jam 0.0178 617,490.00 10,991.32
Dump Truck Kap. 3,5 Ton Jam 0.0433 317,000.00 13,726.10
Water Thank Truck Jam 0.0075 320,000.00 2,400.00
Bulldozer Jam 0.0140 746,800.00 10,455.20
1 UPAH
Pekerja OH 0.4000 75,400.00 30,160.00
Mandor OH 0.0400 121,000.00 4,840.00
2 BAHAN
Pasir Urug M3 1.2000 194,800.00 233,760.00
3 PERALATAN
1 UPAH
Pekerja OH 0.2500 75,400.00 18,850.00
Mandor OH 0.0250 121,000.00 3,025.00
2 BAHAN
Pasir Sitru M3 1.2000 194,800.00 233,760.00
3 PERALATAN
1 UPAH
Pekerja OH 0.2500 75,400.00 18,850.00
Mandor OH 0.0250 121,000.00 3,025.00
2 BAHAN
Tanaha Hitam M3 1.2000 56,000.00 67,200.00
3 PERALATAN
1 UPAH
Pekerja OH 0.0500 75,400.00 3,770.00
Mandor OH 0.0050 75,400.00 377.00
2 BAHAN
Excavator, 0.8 m³ Jam 0.0178 617,490.00 10,991.32
3 PERALATAN
1 UPAH
Pekerja OH 0.3088 75,400.00 23,283.52
Tukang Bor OH 0.7720 97,670.00 75,401.24
Mandor OH 0.0309 121,000.00 3,738.90
2 BAHAN
Borehole dia. 8 3/4" m 0.5405 675,000.00 364,837.50
3 PERALATAN
1 UPAH
Pekerja OH 0.7800 75,400.00 58,812.00
Tukang Batu OH 0.3900 97,670.00 38,091.30
Kepala Tukang OH 0.0390 116,400.00 4,539.60
Mandor OH 0.0390 121,000.00 4,719.00
2 BAHAN
Batu Kali/Batu Karang M3 1.2000 160,964.91 193,157.89
Pasir Pasang M3 0.4320 280.83 121.32
3 PERALATAN
1 UPAH
Pekerja OH 0.3500 75,400.00 26,390.00
Tukang Batu OH 0.1500 97,670.00 14,650.50
Kepala Tukang OH 0.0150 116,400.00 1,746.00
Mandor OH 0.0180 121,000.00 2,178.00
2 BAHAN
HB-20 M3 12.5000 2,500.00 31,250.00
Semen Portlan KG 24.2600 1,245.14 30,207.10
Pasir Pasang M3 0.7720 393,156.86 303,517.10
Besi Angker Ø 8 mm KG 0.2800 13,100.00 3,668.00
3 PERALATAN
1 UPAH
Pekerja OH 1.5000 75,400.00 113,100.00
Tukang Batu OH 0.7500 97,670.00 73,252.50
Kepala Tukang OH 0.0750 116,400.00 8,730.00
Mandor OH 0.0750 121,000.00 9,075.00
2 BAHAN
Batu Karang/Batu Kali M3 1.2000 189,876.08 227,851.29
Pasir Pasang M3 0.4850 393,156.86 190,681.08
Semen Portlan KG 202.0000 1,245.14 251,518.35
3 PERALATAN
Molen (Concrete Mixer 0,35 m3) Sewa-Hari 0.1670 143,000.00 23,881.00
1 UPAH
Pekerja OH 1.5000 75,400.00 113,100.00
Tukang Batu OH 0.7500 97,670.00 73,252.50
Kepala Tukang OH 0.0750 116,400.00 8,730.00
Mandor OH 0.0750 121,000.00 9,075.00
2 BAHAN
Batu Karang/Batu Kali M3 1.2000 189,876.08 227,851.29
Pasir Pasang M3 0.5200 393,156.86 204,441.57
Semen Portlan KG 163.0000 1,245.14 202,957.88
3 PERALATAN
Molen (Concrete Mixer 0,35 m3) Sewa-Hari 0.1670 320,000.00 53,440.00
1 UPAH
Pekerja OH 0.3000 75,400.00 22,620.00
Tukang Batu OH 0.1500 97,670.00 14,400.00
Kepala Tukang OH 0.0150 116,400.00 1,746.00
Mandor OH 0.0150 121,000.00 1,815.00
2 BAHAN
Pasir Pasang M3 0.0230 393,156.86 9,042.61
Semen Portlan KG 7.7760 1,245.14 9,682.21
3 PERALATAN
1 UPAH
Pekerja OH 0.3000 75,400.00 22,620.00
Tukang Batu OH 0.1500 97,670.00 14,400.00
Kepala Tukang OH 0.0150 116,400.00 1,746.00
Mandor OH 0.0150 121,000.00 1,815.00
2 BAHAN
Pasir Pasang M3 0.0260 393,156.86 10,222.08
Semen Portlan KG 5.1840 1,245.14 6,454.81
3 PERALATAN
1 UPAH
Pekerja OH 0.2000 75,400.00 15,080.00
Tukang OH 0.1000 97,670.00 9,767.00
Kepala Tukang OH 0.0100 116,400.00 1,164.00
Mandor OH 0.0100 121,000.00 1,210.00
2 BAHAN
Semen Portlan Zak 3.2500 1,245.14 4,046.71
3 PERALATAN
1 UPAH
Pekerja OH 0.0200 75,400.00 1,508.00
Tukang OH 0.0630 97,670.00 6,153.21
Kepala Tukang OH 0.0060 116,400.00 698.40
Mandor OH 0.0030 121,000.00 363.00
2 BAHAN
Plamir KG 0.1000 20,000.00 2,000.00
Cat Dasar KG 0.1000 88,000.00 8,800.00
Cat Penutup 2x KG 0.2600 120,000.00 31,200.00
3 PERALATAN
1 UPAH
Pekerja OH 0.1500 75,400.00 11,310.00
Mandor OH 0.0150 121,000.00 1,815.00
2 BAHAN
Ijuk KG 6.0000 5,000.00 30,000.00
3 PERALATAN
1 UPAH
Pekerja OH 3.3000 75,400.00 248,820.00
Tukang OH 1.1000 97,670.00 107,437.00
Kepala Tukang OH 0.0100 116,400.00 1,164.00
Mandor OH 0.1600 121,000.00 19,360.00
2 BAHAN
Closet Duduk Unit 1.0000 1,750,000.00 1,750,000.00
Perlengkapan LS 0.0600 105,000.00 6,300.00
3 PERALATAN
1 UPAH
Pekerja OH 1.0000 75,400.00 75,400.00
Tukang OH 1.5000 97,670.00 146,505.00
Pekerja OH 0.1500 116,400.00 17,460.00
Mandor OH 0.1600 121,000.00 19,360.00
2 BAHAN
Closet Jongkok UNIT 1.0000 750,000.00 750,000.00
Semen Porland KG 6.0000 1,245.14 7,470.84
Pasir Pasang M3 0.1000 393,156.86 39,315.69
3 PERALATAN
1 UPAH
Pekerja OH 0.2400 75,400.00 18,096.00
Tukang OH 0.1200 97,670.00 11,720.40
Kepala Tukang OH 0.0120 116,400.00 1,396.80
Mandor OH 0.0240 121,000.00 2,904.00
2 BAHAN
Batu Alam/Batu Candi m2 1.2000 75,000.00 90,000.00
Pasir Pasang m3 0.0250 393,156.86 9,828.92
Portland Semen kg 5.0000 1,245.14 6,225.70
3 PERALATAN
1 UPAH
Pekerja OH 0.1000 75,400.00 7,540.00
Mandor OH 0.0100 121,000.00 1,210.00
2 BAHAN
Gebalan Rumput m2 1.1000 45,000.00 49,500.00
3 PERALATAN
1 UPAH
Pekerja OH 0.3000 75,400.00 22,620.00
Tukang OH 0.1000 97,670.00 9,767.00
Kepala Tukang OH 0.0100 116,400.00 1,164.00
Mandor OH 0.0150 121,000.00 1,815.00
2 BAHAN
Bata Rooster M3 30.0000 18,000.00 540,000.00
Pasir Pasang m3 0.0350 393,156.86 13,760.49
Portland Semen kg 11.0000 1,245.14 13,696.54
3 PERALATAN
1 UPAH
Tukang OH 3.3333 97,670.00 233,333.33
Pekerja OH 6.6667 75,400.00 502,666.67
Mandor OH 0.6667 121,000.00 80,666.67
2 BAHAN
Batu Kali M3 11.0000 189,876.08 2,088,636.83
Kawat Beronjong Set 10.0000 881,250.00 8,812,500.00
3 PERALATAN
Dump Truck Kapasitas 5 Ton Jam 0.2030 480,860.00 48,899.76
1 UPAH
Pekerja OH 0.3000 75,400.00 22,620.00
Tukang Batu OH 0.1000 97,670.00 9,767.00
Kepala Tukang OH 0.0100 116,400.00 1,164.00
Mandor OH 0.0150 121,000.00 1,815.00
2 BAHAN
Bata Merah Uk. 5x11x22 cm Buah 70.0000 2,000.00 140,000.00
Semen Portlan KG 11.5000 1,245.14 14,319.11
Pasir Pasang M3 0.0430 280.83 12.08
3 PERALATAN
1 UPAH
Pekerja OH 0.3500 75,400.00 26,390.00
Tukang Batu OH 0.1500 97,670.00 14,650.50
Kepala Tukang OH 0.0150 116,400.00 1,746.00
Mandor OH 0.0180 121,000.00 2,178.00
2 BAHAN
Baatako m2 12.5000 2,500.00 31,250.00
Semen Portlan KG 24.2600 1,245.14 30,207.10
Pasir Pasang M3 0.7720 393,156.86 303,517.10
3 PERALATAN
1 UPAH
Pekerja OH 0.0420 75,400.00 3,166.80
Tukang Batu OH 0.0040 97,670.00 390.68
Kepala Tukang OH 0.0020 116,400.00 232.80
Mandor OH 0.0420 121,000.00 5,082.00
2 BAHAN
Pagar BRC dan Tiang Lembar 0.4167 565,000.00 235,416.67
3 PERALATAN
1 UPAH
Pekerja OH 1.2000 75,400.00 90,480.00
Tukang Batu OH 0.2000 97,670.00 19,534.00
Kepala Tukang OH 0.0200 116,400.00 2,328.00
Mandor OH 0.0600 121,000.00 7,260.00
2 BAHAN
Semen Porlant Kg 230.0000 1,245.14 286,382.28
Pasir Beton Kg 893.0000 280.83 250,777.91
Kerikil Kg 1072.0000 222.11 238,103.11
Air L 200.0000 16.00 3,200.00
3 PERALATAN
1 UPAH
Pekerja OH 1.6500 75,400.00 124,410.00
Tukang Batu OH 0.2750 97,670.00 14,175.00
Kepala Tukang OH 0.0280 116,400.00 3,259.20
Mandor OH 0.0830 121,000.00 10,043.00
2 BAHAN
Semen Portlan Kg 276.0000 1,245.14 343,658.74
Pasir Beton Kg 828.0000 280.83 232,524.20
Krikil Kg 1012.0000 222.11 224,776.44
Air L 215.0000 16.00 3,440.00
3 PERALATAN
1 UPAH
Pekerja OH 1.6500 75,400.00 124,410.00
Tukang Batu OH 0.2750 97,670.00 14,175.00
Kepala Tukang OH 0.0280 116,400.00 3,259.20
Mandor OH 0.0830 121,000.00 10,043.00
2 BAHAN
Semen Portlan Kg 326.0000 1,245.14 405,915.75
Pasir Beton Kg 760.0000 280.83 213,428.01
Krikil Kg 1029.0000 222.11 228,552.33
Air L 215.0000 16.00 3,440.00
3 PERALATAN
Molen Jam 1.7500 34,250.00 59,937.50
Vibrator Jam 0.7000 25,270.00 17,689.00
1 UPAH
Pekerja OH 1.6500 75,400.00 124,410.00
Tukang Batu OH 0.2750 97,670.00 14,175.00
Kepala Tukang OH 0.0280 116,400.00 3,259.20
Mandor OH 0.0830 121,000.00 10,043.00
2 BAHAN
Semen Portlan Kg 352.0000 1,245.14 438,289.40
Pasir Beton Kg 731.0000 280.83 205,284.05
Krikil Kg 1031.0000 222.11 228,996.56
Air L 215.0000 16.00 3,440.00
3 PERALATAN
Molen Jam 1.7500 34,250.00 59,937.50
Vibrator Jam 0.7000 25,270.00 17,689.00
1 UPAH
Pekerja OH 1.6500 75,400.00 124,410.00
Tukang Batu OH 0.2750 97,670.00 14,175.00
Kepala Tukang OH 0.0280 116,400.00 3,259.20
Mandor OH 0.0830 121,000.00 10,043.00
2 BAHAN
Semen Portlan Kg 371.0000 1,245.14 461,947.07
Pasir Beton Kg 698.0000 280.83 196,016.78
Krikil Kg 1047.0000 222.11 232,550.33
Air L 215.0000 16.00 3,440.00
3 PERALATAN
Molen Jam 1.7500 34,250.00 59,937.50
Vibrator Jam 0.7000 25,270.00 17,689.00
1 UPAH
Pekerja OH 1.6500 75,400.00 124,410.00
Tukang Batu OH 0.2750 97,670.00 14,175.00
Kepala Tukang OH 0.0280 116,400.00 3,259.20
Mandor OH 0.0830 121,000.00 10,043.00
2 BAHAN
Semen Portlan Kg 384.0000 1,245.14 478,133.89
Pasir Beton Kg 692.0000 280.83 194,331.82
Krikil Kg 1039.0000 222.11 230,773.44
Air L 215.0000 16.00 3,440.00
3 PERALATAN
Molen Jam 1.7500 34,250.00 59,937.50
Vibrator Jam 0.7000 25,270.00 17,689.00
1 UPAH
Pekerja OH 0.0700 75,400.00 5,278.00
Tukang Besi OH 0.0700 97,670.00 6,836.90
Kepala Tukang OH 0.0070 116,400.00 814.80
Mandor OH 0.0040 121,000.00 484.00
2 BAHAN
Besi Beton (Polos/Ulir) KG 10.5000 13,100.00 137,550.00
Kawar Ikat KG 0.1500 15,000.00 2,250.00
3 PERALATAN
1 UPAH
Pekerja OH 0.0250 75,400.00 1,885.00
Tukang Besi OH 0.0250 97,670.00 2,441.75
Kepala Tukang OH 0.0250 116,400.00 2,910.00
Mandor OH 0.0010 121,000.00 121.00
2 BAHAN
Jaring Kawat Baja dilas KG 10.2000 20,000.00 204,000.00
Kawar Beton KG 0.0500 15,000.00 750.00
3 PERALATAN
1 UPAH
Pekerja OH 0.5200 75,400.00 39,208.00
Tukang Kayu OH 0.2600 97,670.00 25,394.20
Kepala Tukang OH 0.0260 116,400.00 3,026.40
Mandor OH 0.0260 121,000.00 3,146.00
2 BAHAN
Kayu Kelas III M3 0.0400 2,725,000.00 109,000.00
Paku 5 cm dan 10 cm KG 0.3000 15,000.00 4,500.00
Minyak Bekisting L 0.1000 25,000.00 2,500.00
3 PERALATAN
1 UPAH
Pekerja OH 0.5200 75,400.00 39,208.00
Tukang Kayu OH 0.2600 97,670.00 25,394.20
Kepala Tukang OH 0.0260 116,400.00 3,026.40
Mandor OH 0.0260 121,000.00 3,146.00
2 BAHAN
Kayu Kelas III M3 0.0450 2,725,000.00 122,625.00
Paku 5 cm dan 10 cm KG 0.3000 15,000.00 4,500.00
Minyak Bekisting L 0.1000 25,000.00 2,500.00
3 PERALATAN
1 UPAH
Pekerja OH 0.6600 75,400.00 49,764.00
Tukang Batu OH 0.3300 97,670.00 32,231.10
Kepala Tukang OH 0.0330 116,400.00 3,841.20
Mandor OH 0.0330 121,000.00 3,993.00
2 BAHAN
Kayu Kelas III M3 0.0400 2,725,000.00 109,000.00
Paku 5 cm dan 10 cm KG 0.4000 15,000.00 6,000.00
Minyak Bekesting LITER 0.2000 25,000.00 5,000.00
Balok Kayu Kelas II M3 0.0150 3,490,000.00 52,350.00
Plywood Tebal 9 mm LEMBAR 0.3500 135,000.00 47,250.00
Kayu Dolken Ukuran 8/10 p. 4m BATANG 2.0000 23,266.67 46,533.33
3 PERALATAN
1 UPAH
Pekerja OH 0.6600 75,400.00 49,764.00
Tukang Batu OH 0.3300 97,670.00 32,231.10
Kepala Tukang OH 0.0330 116,400.00 3,841.20
Mandor OH 0.0330 121,000.00 3,993.00
2 BAHAN
Kayu Kelas III M3 0.0400 2,725,000.00 109,000.00
Paku 5 cm dan 10 cm KG 0.4000 15,000.00 6,000.00
Minyak Bekesting LITER 0.2000 25,000.00 5,000.00
Balok Kayu Kelas II M3 0.0180 3,490,000.00 62,820.00
Plywood Tebal 9 mm LEMBAR 0.3500 135,000.00 47,250.00
Kayu Dolken Ukuran 8/10 p. 4m BATANG 2.0000 23,266.67 46,533.33
-
-
3 PERALATAN
1 UPAH
Pekerja OH 0.6600 75,400.00 49,764.00
Tukang Batu OH 0.3300 97,670.00 32,231.10
Kepala Tukang OH 0.0330 116,400.00 3,841.20
Mandor OH 0.0330 121,000.00 3,993.00
2 BAHAN
Kayu Kelas III M3 0.0400 2,725,000.00 109,000.00
Paku 5 cm dan 10 cm KG 0.4000 15,000.00 6,000.00
Minyak Bekesting LITER 0.2000 25,000.00 5,000.00
Balok Kayu Kelas II M3 0.0150 3,490,000.00 52,350.00
Plywood Tebal 9 mm LEMBAR 0.3500 135,000.00 47,250.00
Kayu Dolken Ukuran 8/10 p. 4m BATANG 6.0000 23,266.67 139,600.00
3 PERALATAN
1 UPAH
Pekerja OH 0.6600 75,400.00 49,764.00
Tukang Batu OH 0.3300 97,670.00 32,231.10
Kepala Tukang OH 0.0330 116,400.00 3,841.20
Mandor OH 0.0330 121,000.00 3,993.00
2 BAHAN
Kayu Kelas III M3 0.0300 2,725,000.00 81,750.00
Paku 5 cm dan 10 cm KG 0.4000 15,000.00 6,000.00
Minyak Bekesting LITER 0.2000 25,000.00 5,000.00
Balok Kayu Kelas II M3 0.0200 3,490,000.00 69,800.00
Plywood Tebal 9 mm LEMBAR 0.3500 135,000.00 47,250.00
Kayu Dolken Ukuran 8/10 p. 4m BATANG 3.0000 23,266.67 69,800.00
Penjaga Jarak Bekisting/scaner BUAH 4.0000 15,000.00 60,000.00
3 PERALATAN
1 UPAH
Pekerja OH 0.1800 75,400.00 13,572.00
Tukang batu OH 0.0200 97,670.00 1,953.40
Tukang kayu OH 0.0200 97,670.00 1,953.40
Tukang besi OH 0.0200 97,670.00 1,953.40
Kepala tukang OH 0.0060 116,400.00 698.40
Mandor OH 0.0090 121,000.00 1,089.00
2 BAHAN
Kayu kelas III M3 0.0020 2,725,000.00 5,450.00
Paku Biasa KG 0.0100 15,000.00 150.00
Minyak bekisting Liter 1.2000 25,000.00 30,000.00
Besi beton (polos/ulir) KG 3.0000 13,100.00 39,300.00
Kawat beton KG 0.4500 15,000.00 6,750.00
Semen portland KG 4.0000 1,245.14 4,980.56
Pasir Beton M3 0.0060 393,156.86 2,358.94
Kerikil M3 0.0090 399,800.00 3,598.20
3 PERALATAN
1 UPAH
Pekerja OH 0.2970 75,400.00 22,393.80
Tukang batu OH 0.0330 97,670.00 3,223.11
Tukang kayu OH 0.0330 97,670.00 3,223.11
Tukang besi OH 0.0330 97,670.00 3,223.11
Kepala tukang OH 0.0100 116,400.00 1,164.00
Mandor OH 0.0150 121,000.00 1,815.00
2 BAHAN
Kayu kelas III M3 0.0030 2,725,000.00 8,175.00
Paku Biasa KG 0.0200 15,000.00 300.00
Minyak bekisting Liter 1.2000 25,000.00 30,000.00
Besi beton (polos/ulir) KG 3.6000 13,100.00 47,160.00
Kawat beton KG 0.0500 15,000.00 750.00
Semen portland KG 5.5000 1,245.14 6,848.27
Pasir Beton M3 0.0090 393,156.86 3,538.41
Kerikil M3 0.0150 399,800.00 5,997.00
3 PERALATAN
1 UPAH
Pekerja OH 0.0600 75,400.00 4,524.00
Tukang Batu OH 0.0600 97,670.00 5,860.20
Kepala Tukang OH 0.0060 116,400.00 698.40
Mandor OH 0.0030 121,000.00 363.00
2 BAHAN
BESI BAJA IWF KG 1.1500 14,200.00 16,330.00
3 PERALATAN
1 UPAH
Pekerja OH 0.0600 75,400.00 4,524.00
Tukang Batu OH 0.0600 97,670.00 5,860.20
Kepala Tukang OH 0.0060 116,400.00 698.40
Mandor OH 0.0030 121,000.00 363.00
2 BAHAN
BESI PROFIL KG 1.1500 10,500.00 12,075.00
3 PERALATAN
1 UPAH
Pekerja OH 0.1000 75,400.00 7,540.00
Tukang Batu OH 0.1000 97,670.00 9,767.00
Kepala Tukang OH 0.0010 116,400.00 116.40
Mandor OH 0.0050 121,000.00 605.00
2 BAHAN
Solar Liter 1.0000 6,600.00 6,600.00
Minyak Pelumas Liter 0.1000 20,000.00 2,000.00
3 PERALATAN
1 UPAH
Tukang Batu OH 0.0500 97,670.00 4,883.50
Mandor OH 0.0030 121,000.00 363.00
2 BAHAN
Mur dan Baut Buah 1.1500 1,500.00 1,725.00
3 PERALATAN
1 UPAH
Pekerja OH 0.0400 75,400.00 3,016.00
Tukang Batu OH 0.0200 97,670.00 1,953.40
Kepala Tukang OH 0.0020 116,400.00 232.80
Mandor OH 0.0020 121,000.00 242.00
2 BAHAN
Kawat Las Listrik Kg 0.4000 15,000.00 6,000.00
Solar Liter 0.3000 6,600.00 1,980.00
Minyak Pelumas Liter 0.0400 20,000.00 800.00
3 PERALATAN
Sewa Alat Las Jam 0.1700 6,196.18 1,053.35
1 UPAH
Pekerja OH 0.0430 75,400.00 3,242.20
Tukang Khusus Alluminium OH 0.0430 97,670.00 4,199.81
Kepala Tukang OH 0.0043 116,400.00 500.52
Mandor OH 0.0021 121,000.00 254.10
2 BAHAN
Profil Alluminium M 1.1000 181,320.00 199,452.00
skrup Fixer BUAH 2.0000 400.00 800.00
Sealant TUBE 0.0600 65,000.00 3,900.00
3 PERALATAN
1 UPAH
Pekerja OH 0.0850 75,400.00 6,409.00
Tukang Khusus Alluminium OH 0.0850 97,670.00 8,301.95
Kepala Tukang OH 0.0085 116,400.00 989.40
Mandor OH 0.0042 121,000.00 508.20
2 BAHAN
Profil Alluminium M 4.4000 181,320.00 797,808.00
Alluminium Strip M 14.6000 15,000.00 219,000.00
3 PERALATAN
1 UPAH
Pekerja OH 0.0850 75,400.00 6,409.00
Tukang Khusus Alluminium OH 0.0850 97,670.00 8,301.95
Kepala Tukang OH 0.0090 116,400.00 1,047.60
Mandor OH 0.0050 121,000.00 605.00
2 BAHAN
Profil Alluminium M 4.4000 181,320.00 797,808.00
skrup Fixer BUAH 4.5000 400.00 1,800.00
Sealant TUBE 0.2700 65,000.00 17,550.00
3 PERALATAN
1 UPAH
Pekerja OH 0.2500 75,400.00 18,850.00
Tukang OH 0.2500 97,670.00 24,417.50
Kepala Tukang OH 0.0250 116,400.00 2,910.00
Mandor OH 0.0130 121,000.00 1,573.00
2 BAHAN
Rangka Metal Hollow 40.40.2 mm M 3.5000 25,000.00 87,500.00
Assesoris, Perkuatan dll LS 1.0000 10,000.00 10,000.00
3 PERALATAN
1 UPAH
Pekerja OH 0.0400 75,400.00 3,016.00
Tukang Besi OH 0.0200 97,670.00 1,953.40
Kepala Tukang OH 0.0020 116,400.00 232.80
Mandor OH 0.0020 121,000.00 242.00
2 BAHAN
Kawat Las Listrik KG 0.4000 15,000.00 6,000.00
Solar LITER 0.3000 6,600.00 1,980.00
Minyak Pelumas LITER 0.0400 20,000.00 800.00
3 PERALATAN
Sewa Alat JAM 0.1700 1,250.00 212.50
1 UPAH
Pekerja OH 6.0000 75,400.00 452,400.00
Tukang Besi OH 18.0000 97,670.00 1,758,060.00
Kepala Tukang OH 1.8000 116,400.00 209,520.00
Mandor OH 0.3000 121,000.00 36,300.00
2 BAHAN
Balok Kayu Kelas II M3 1.2000 3,350,000.00 4,020,000.00
Paku 10 cm KG 1.2500 15,000.00 18,750.00
Lem Kayu KG 1.0000 67,000.00 67,000.00
3 PERALATAN
Sewa Alat JAM 0.1700 10,000.00 1,700.00
1 UPAH
Pekerja OH 7.0000 75,400.00 527,800.00
Tukang Besi OH 21.0000 97,670.00 2,051,070.00
Kepala Tukang OH 2.1000 116,400.00 244,440.00
Mandor OH 0.3500 121,000.00 42,350.00
2 BAHAN
Balok Kayu Kelas I M3 1.1000 7,350,000.00 8,085,000.00
Paku 10 cm KG 1.2500 15,000.00 18,750.00
Lem Kayu KG 1.0000 67,000.00 67,000.00
3 PERALATAN
Sewa Alat JAM 0.1700 10,000.00 1,700.00
1 UPAH
Pekerja OH 1.0000 75,400.00 75,400.00
Tukang Besi OH 3.0000 97,670.00 293,010.00
Kepala Tukang OH 0.3000 116,400.00 34,920.00
Mandor OH 0.0500 121,000.00 6,050.00
2 BAHAN
Papan Kayu Kelas II M3 0.0400 3,350,000.00 134,000.00
Lem Kayu' KG 0.5000 67,000.00 33,500.00
3 PERALATAN
Sewa Alat JAM 0.1700 10,000.00 1,700.00
1 UPAH
Pekerja OH 0.8000 75,400.00 60,320.00
Tukang Besi OH 2.4000 97,670.00 234,408.00
Kepala Tukang OH 0.2400 116,400.00 27,936.00
Mandor OH 0.0400 121,000.00 4,840.00
2 BAHAN
Papan Kayu Kelas II M3 0.0240 16,200,000.00 388,800.00
Lem Kayu' KG 0.3000 320,000.00 96,000.00
Kaca M2 0.6400 125,000.00 80,000.00
3 PERALATAN
Sewa Alat JAM 0.1700 10,000.00 1,700.00
1 UPAH
Pekerja OH 0.2000 75,400.00 15,080.00
Tukang Kayu OH 0.1000 97,670.00 9,767.00
Kepala Tukang OH 0.0100 116,400.00 1,164.00
Mandor OH 0.0010 121,000.00 121.00
2 BAHAN
Genteng Metal Bh 1.3000 162,000.00 210,600.00
Paku Biasa Kg 0.2000 15,000.00 3,000.00
3 PERALATAN
1 UPAH
Pekerja OH 0.0200 75,400.00 1,508.00
Tukang Atap OH 0.0800 97,670.00 7,813.60
Kepala Tukang OH 0.0100 116,400.00 1,164.00
Mandor OH 0.0060 121,000.00 726.00
2 BAHAN
Atap Spandek Zincalume M2 1.1000 55,000.00 60,500.00
Screw Cteks 12 - 4 x 50 Bh 6.0000 1,200.00 7,200.00
Screw Cteks 10 x 16 - 16 Bh 2.0000 750.00 1,500.00
3 PERALATAN
1 UPAH
Pekerja OH 0.1100 75,400.00 8,294.00
Tukang Kayu OH 0.2200 97,670.00 21,487.40
Kepala Tukang OH 0.0220 116,400.00 2,560.80
Mandor OH 0.0050 121,000.00 605.00
2 BAHAN
GRC 4mm Lbr 0.0760 90,000.00 6,840.00
Paku 1 dan 3 cm KG 0.0500 15,000.00 750.00
3 PERALATAN
1 UPAH
Pekerja OH 0.2000 75,400.00 15,080.00
Tukang Kayu OH 0.4500 97,670.00 43,951.50
Kepala Tukang OH 0.0100 116,400.00 1,164.00
Mandor OH 0.0500 121,000.00 6,050.00
2 BAHAN
Profil C-75 M 3.7200 15,500.00 57,660.00
Mur, Baut dan Sekrup BUAH 28.0000 1,500.00 42,000.00
Reng Canai Dingin M 5.4000 12,000.00 64,800.00
Dynabol dia 12 x 120 mm BUAH 2.0000 7,200.00 14,400.00
Talang / Jurai Canai Dingin M 0.1240 20,000.00 2,480.00
3 PERALATAN
1 UPAH
Pekerja OH 2.5000 75,400.00 188,500.00
Tukang Kayu OH 0.1500 97,670.00 14,650.50
Kepala Tukang OH 0.0150 116,400.00 1,746.00
Mandor OH 0.0130 121,000.00 1,573.00
2 BAHAN
Nok Genteng Metal M3 1.1000 135,000.00 148,500.00
Paku Biasa 4 - 5 cm KG 0.0500 15,000.00 750.00
3 PERALATAN
1 UPAH
Pekerja OH 4.0000 75,400.00 301,600.00
Tukang OH 12.0000 97,670.00 1,172,040.00
Kepala Tukang OH 1.2000 116,400.00 139,680.00
Mandor OH 0.2000 121,000.00 24,200.00
2 BAHAN
Kayu Balok Kelas II Ukuran 6/12 M3 1.1000 3,350,000.00 3,685,000.00
Besi Strip Tebal 5 mm KG 15.0000 13,500.00 202,500.00
Paku Biasa KG 5.6000 15,000.00 84,000.00
3 PERALATAN
1 UPAH
Pekerja OH 6.7000 75,400.00 505,180.00
Tukang OH 20.1000 97,670.00 1,963,167.00
Kepala Tukang OH 2.0100 116,400.00 233,964.00
Mandor OH 0.3350 121,000.00 40,535.00
2 BAHAN
Kayu Balok Kelas II Ukuran 6/12 M3 1.1000 3,350,000.00 3,685,000.00
Besi Strip Tebal 5 mm KG 15.0000 13,500.00 202,500.00
Paku Biasa KG 3.0000 15,000.00 45,000.00
3 PERALATAN
1 UPAH
Pekerja OH 0.0500 75,400.00 3,770.00
Tukang OH 0.0500 97,670.00 4,883.50
Kepala Tukang OH 0.0050 116,400.00 582.00
Mandor OH 0.0030 121,000.00 363.00
2 BAHAN
Angker Baut dia. 16 mm - 40 mm BUAH 1.1000 50,000.00 55,000.00
3 PERALATAN
1 UPAH
Pekerja OH 0.1200 75,400.00 9,048.00
Tukang OH 0.0600 97,670.00 5,860.20
Kepala Tukang OH 0.0060 116,400.00 698.40
Mandor OH 0.0060 121,000.00 726.00
2 BAHAN
Seng Gelombang BJLS-30 Lembar 0.7000 65,000.00 45,500.00
Paku Seng kg 0.0200 15,000.00 300.00
3 PERALATAN
1 UPAH
Pekerja OH 0.1000 75,400.00 7,540.00
Tukang Kayu OH 0.1000 97,670.00 9,767.00
Kepala Tukang OH 0.0100 116,400.00 1,164.00
Mandor OH 0.0050 121,000.00 605.00
2 BAHAN
Tripleks Tebal 6 mm LEMBAR 0.3750 65,000.00 24,375.00
Paku Tripkels KG 0.0300 15,000.00 450.00
3 PERALATAN
1 UPAH
Pekerja OH 0.0500 75,400.00 3,770.00
Tukang Kayu OH 0.0500 97,670.00 4,883.50
Kepala Tukang OH 0.0050 116,400.00 582.00
Mandor OH 0.0030 121,000.00 363.00
2 BAHAN
List Kayu Profil M 1.0500 4,200.00 4,410.00
Paku KG 0.0100 15,000.00 150.00
3 PERALATAN
1 UPAH
Pekerja OH 0.2000 75,400.00 15,080.00
Tukang Kayu OH 0.3000 97,670.00 29,301.00
Kepala Tukang OH 0.0300 116,400.00 3,492.00
Mandor OH 0.0100 121,000.00 1,210.00
2 BAHAN
Kayu 5/7 cm Kelas III M3 0.0163 2,725,000.00 44,417.50
Paku 3-5 cm KG 0.2500 15,000.00 3,750.00
3 PERALATAN
1 UPAH
Pekerja OH 0.8000 75,400.00 60,320.00
Tukang Kayu OH 0.8000 97,670.00 78,136.00
Kepala Tukang OH 0.0800 116,400.00 9,312.00
Mandor OH 0.0400 121,000.00 4,840.00
2 BAHAN
Kayu Papan M3 0.0150 3,350,000.00 50,250.00
Paku Tripleks KG 0.0100 15,000.00 150.00
3 PERALATAN
1 UPAH
Pekerja OH 0.8000 75,400.00 60,320.00
Mandor OH 0.0800 121,000.00 9,680.00
2 BAHAN
Stop Kontak Broko Standard (1 Phase) BUAH 1.0000 35,000.00 35,000.00
3 PERALATAN
1 UPAH
Pekerja OH 0.4000 75,400.00 30,160.00
Mandor OH 0.0400 121,000.00 4,840.00
2 BAHAN
Kabel Broko M 1.0000 12,000.00 12,000.00
3 PERALATAN
1 UPAH
Pekerja OH 0.8000 75,400.00 60,320.00
Mandor OH 0.0800 121,000.00 9,680.00
2 BAHAN
Lampu SL Philip 25 Watt BUAH 1.0000 20,000.00 20,000.00
3 PERALATAN
1 UPAH
Pekerja OH 0.1000 75,400.00 7,540.00
Tukang Kayu OH 0.0500 97,670.00 4,883.50
Kepala Tukang OH 0.0050 116,400.00 582.00
Mandor OH 0.0050 121,000.00 605.00
2 BAHAN
Gypsum Board Lembar 0.3640 70,000.00 25,480.00
Paku Skrup Kg 0.1100 17,000.00 1,870.00
3 PERALATAN
1 UPAH
Pekerja OH 0.7000 75,400.00 52,780.00
Tukang Batu OH 0.3500 97,670.00 34,184.50
Kepala Tukang OH 0.0350 116,400.00 4,074.00
Mandor OH 0.0350 121,000.00 4,235.00
2 BAHAN
Lantai Keramik 30 X 30 cm BUAH 11.8700 4,100.00 48,667.00
Semen Porland KG 10.0000 1,245.14 12,451.40
Pasir Pasang M3 0.0450 280.83 12.64
Semen Warna KG 1.5000 1,245.14 1,867.71
3 PERALATAN
1 UPAH
Pekerja OH 0.7000 75,400.00 52,780.00
Tukang Batu OH 0.3500 97,670.00 34,184.50
Kepala Tukang OH 0.0350 116,400.00 4,074.00
Mandor OH 0.0350 121,000.00 4,235.00
2 BAHAN
Lantai Keramik Ukuran 20 x 20 BUAH 26.5000 1,800.00 47,700.00
Semen Porland KG 10.4000 1,245.14 12,949.46
Pasir Pasang M3 0.0450 280.83 12.64
Semen Warna KG 1.6200 1,245.14 2,017.13
3 PERALATAN
1 UPAH
Pekerja OH 0.2600 75,400.00 19,604.00
Tukang Batu OH 0.1300 97,670.00 12,697.10
Kepala Tukang OH 0.0130 116,400.00 1,513.20
Mandor OH 0.0130 121,000.00 1,573.00
2 BAHAN
Lantai Granit Ukuran 60 x 60 cm BUAH 4.0000 85,000.00 340,000.00
Semen Porland KG 10.0000 1,245.14 12,451.40
Pasir Pasang M3 0.0450 280.83 12.64
Semen Warna KG 1.5000 1,245.14 1,867.71
3 PERALATAN
1 UPAH
Pekerja OH 0.2600 75,400.00 19,604.00
Tukang Batu OH 0.1300 97,670.00 12,697.10
Kepala Tukang OH 0.0130 116,400.00 1,513.20
Mandor OH 0.0130 121,000.00 1,573.00
2 BAHAN
Lantai Granit Ukuran 30 x 60 cm BUAH 6.0000 46,666.67 280,000.00
Semen Porland KG 10.0000 1,245.14 12,451.40
Pasir Pasang M3 0.0450 280.83 12.64
Semen Warna KG 1.5000 1,245.14 1,867.71
3 PERALATAN
1 UPAH
Pekerja OH 0.0900 75,400.00 6,786.00
Tukang Batu OH 0.0900 97,670.00 8,790.30
Kepala Tukang OH 0.0090 116,400.00 1,047.60
Mandor OH 0.0050 121,000.00 605.00
2 BAHAN
Plint Lantai Ukuran 10 x 60 cm BUAH 1.7650 18,000.00 31,770.00
Semen Porland KG 1.1400 1,245.14 1,419.46
Pasir Pasang M3 0.0030 280.83 0.84
Semen Warna KG 0.1000 1,245.14 124.51
3 PERALATAN
1 UPAH
Pekerja OH 0.7000 75,400.00 52,780.00
Tukang Batu OH 0.3500 97,670.00 34,184.50
Kepala Tukang OH 0.0350 116,400.00 4,074.00
Mandor OH 0.0350 121,000.00 4,235.00
2 BAHAN
Parquet Kayu Uk. 1.2 cm x 5 cm x 25 cm M2 1.0500 245,000.00 257,250.00
Lem Parquet KG 0.6000 179,000.00 107,400.00
3 PERALATAN
1 UPAH
Pekerja OH 0.0900 75,400.00 6,786.00
Tukang Batu OH 0.0900 97,670.00 8,790.30
Kepala Tukang OH 0.0090 116,400.00 1,047.60
Mandor OH 0.0050 121,000.00 605.00
2 BAHAN
Step Nozing Tangga Uk. 10 x 60 cm BUAH 1.7650 16,000.00 28,240.00
Semen Porland KG 1.1400 1,245.14 1,419.46
Pasir Pasang M3 0.0030 280.83 0.84
Semen Warna KG 0.1000 1,245.14 124.51
3 PERALATAN
1 UPAH
Pekerja OH 0.2500 75,400.00 18,850.00
Tukang Batu OH 0.2500
Kepala Tukang OH 0.0250
Mandor OH 0.0025 121,000.00 302.50
2 BAHAN
Paving Stone Tebal 6 cm 1.1000 130,000.00 143,000.00
Pasir Pasang 0.0350 393,156.86 13,760.49
3 PERALATAN
1 UPAH
Pekerja OH 1.8000 75,400.00 135,720.00
Mandor OH 0.1800 121,000.00 21,780.00
2 BAHAN
3 PERALATAN
Palu/Golam (baja Keras) BH 0.0060 100,000.00 600.00
Pahat Beton (baja keras) BH 0.0090 54,000.00 486.00
Linggis (baja keras) BH 0.0200 54,000.00 1,080.00
1 UPAH
Pekerja OH 0.6000 75,400.00 45,240.00
Mandor OH 0.0600 121,000.00 7,260.00
2 BAHAN
3 PERALATAN
Palu/Golam (baja Keras) BH 0.0020 100,000.00 200.00
Pahat Beton (baja keras) BH 0.0030 150,000.00 450.00
Linggis (baja keras) BH 0.0700 54,000.00 3,780.00
1 UPAH
Pekerja OH 2.6500 75,400.00 199,810.00
Mandor OH 0.2650 121,000.00 32,065.00
2 BAHAN
Cuka Cabit L 1.2000 26,000.00 31,200.00
3 PERALATAN
Palu/Golam (baja Keras) BH 0.1000 100,000.00 10,000.00
Gargaji Besi BH 0.2000 54,000.00 10,800.00
Linggis (baja keras) BH 0.5000 54,000.00 27,000.00
1 UPAH
Pekerja OH 0.4000 75,400.00 30,160.00
Tukang Kayu OH 0.2000 97,670.00 19,534.00
Kepala Tukang OH 0.0500 116,400.00 5,820.00
Mandor OH 0.0500 121,000.00 6,050.00
2 BAHAN
Hollow 4/4 Zincromate BATANG 0.5600 30,000.00 16,800.00
Rock Wool 120 x 60 cm LEMBAR 1.4000 84,000.00 117,600.00
Gypsum Board (120 x 240 x 9) cm LEMBAR 0.3640 70,000.00 25,480.00
Paku Gypsum KG 0.1100 17,000.00 1,870.00
Fisher BUAH 4.0000 3,000.00 12,000.00
Cotton Plaster BUAH 0.0720 15,000.00 1,080.00
Compoun ZAK 0.1250 75,000.00 9,375.00
3 PERALATAN
1 UPAH
Pekerja OH 0.0200 75,400.00 1,508.00
Tukang OH 0.2000 97,670.00 19,534.00
Kepala Tukang OH 0.0020 116,400.00 232.80
Mandor OH 0.0030 121,000.00 363.00
2 BAHAN
Wallpaper M2 1.2000 95,000.00 114,000.00
Lem Kuning KG 0.2000 80,000.00 16,000.00
3 PERALATAN
1 UPAH
Pekerja OH 6.0000 75,400.00 452,400.00
Tukang Kayu OH 18.0000 97,670.00 1,758,060.00
Kepala Tukang OH 1.8000 116,400.00 209,520.00
Mandor OH 0.3000 121,000.00 36,300.00
2 BAHAN
Balok Kayu Kelas II M3 0.5600 3,350,000.00 1,876,000.00
Paku 10 cm KG 1.4000 15,000.00 21,000.00
Lem Kayu KG 0.3640 67,000.00 24,388.00
3 PERALATAN
1 UPAH
Pekerja OH 0.6100 75,400.00 45,994.00
Tukang Kayu OH 0.1500 97,670.00 14,650.50
Kepala Tukang OH 0.1500 116,400.00 17,460.00
Mandor OH 0.0800 121,000.00 9,680.00
2 BAHAN
Tiang lampu type Dual, Lighting Pole Galvanis, H=11 BUAH 1.0000 16,200,000.00 16,200,000.00
Lampu Sodium 250 Watt BUAH 2.0000 300,000.00 600,000.00
Kabel Broko M 15.0000 12,000.00 180,000.00
Beton K 250 M3 0.7200 1,249,812.00 899,864.64
Reinforcing Steel deform = 56 x 1.05 KG 58.8000 15,000.00 882,000.00
MCB,1P, 16 A BUAH 2.0000 40,000.00 80,000.00
Plat besi = 0.009x0.4x0.4x7850 M3 0.7200 20,000.00 14,400.00
Copper Rod = 22/7 x(0.007)^2 x 1 x 7850 KG 1.2100 5,000.00 6,050.00
Pipa PVC dia 3" M3 15.0000 40,000.00 600,000.00
Bekisting Buah 1.0000 2,200,000.00 2,200,000.00
3 PERALATAN
Dump Truck JAM 0.1200 317,000.00 38,040.00
Alat Bantu LS 1.0000 1,000.00 1,000.00
1 UPAH
Pekerja OH 0.4000 75,400.00 30,160.00
Tukang Pipa OH 0.2000 97,670.00 19,534.00
Mandor OH 0.0400 121,000.00 4,840.00
2 BAHAN
Pipa GIP Ø 100 mm M 1.0000 304,100.00 304,100.00
3 PERALATAN
1 UPAH
Pekerja OH 0.0080 75,400.00 603.20
Mandor OH 0.0008 121,000.00 96.80
2 BAHAN
Air Test (air bersih) Liter 0.0080 16.00 0.13
Bahan bakar Liter 0.0600 6,600.00 396.00
Oli Liter 0.0020 37,000.00 74.00
3 PERALATAN
1 UPAH
Pekerja OH 0.0135 75,400.00 1,017.90
Tukang Pipa OH 0.2250 97,670.00 21,975.75
Kepala Tukang OH 0.0230 116,400.00 2,677.20
Mandor OH 0.0070 121,000.00 847.00
2 BAHAN
Pipa GIP Ø 75 mm M 1.2000 223,200.00 267,840.00
3 PERALATAN
1 UPAH
Pekerja OH 0.0080 75,400.00 603.20
Mandor OH 0.0008 121,000.00 96.80
2 BAHAN
Air Test (air bersih) Liter 0.0040 16.00 0.06
Bahan bakar Liter 0.0600 6,600.00 396.00
Oli Liter 0.0020 37,000.00 74.00
3 PERALATAN
1 UPAH
Pekerja OH 0.3450 75,400.00 26,013.00
Tukang Pipa OH 0.1720 97,670.00 16,799.24
Mandor OH 0.0340 121,000.00 4,114.00
2 BAHAN
Pipa GIP Ø 50 mm M 1.0000 94,700.00 94,700.00
3 PERALATAN
1 UPAH
Pekerja OH 0.0080 75,400.00 603.20
Mandor OH 0.0008 121,000.00 96.80
2 BAHAN
Air Test (air bersih) Liter 0.0020 16.00 0.03
Bahan bakar Liter 0.0600 6,600.00 396.00
Oli Liter 0.0020 37,000.00 74.00
3 PERALATAN
1 UPAH
Pekerja OH 0.0050 75,400.00 377.00
Mandor OH 0.0008 121,000.00 96.80
2 BAHAN
drum bekas bh 3.0000 175,000.00 525,000.00
pipa HDPE ᴓ160mm m 3.0000 447,413.08 1,342,239.24
gravel m3 3.1500 252,000.00 793,800.00
3 PERALATAN
1 UPAH
Pekerja OH 0.0400 75,400.00 3,016.00
Tukang Las Pipa OH 0.0200 97,670.00 1,953.40
Mandor OH 0.0040 121,000.00 484.00
2 BAHAN
Pipa HDPE Ø 110 mm m 1.0000 201,698.38 201,698.38
3 PERALATAN
Mesin Las Pipa HDPE HARI 0.1000 183,877.78 18,387.78
Sewa Tripot/Tackel HARI 0.0090 100,000.00 900.00
1 UPAH
Pekerja OH 0.0400 75,400.00 3,016.00
Tukang Las Pipa OH 0.0200 97,670.00 1,953.40
Mandor OH 0.0040 121,000.00 484.00
2 BAHAN
Pipa HDPE Ø 90 mm m 1.0000 135,296.14 135,296.14
3 PERALATAN
Mesin Las Pipa HDPE HARI 0.0750 183,877.78 13,790.83
SewSewa Tripot/Tackel HARI 0.0090 100,000.00 900.00
1 UPAH
Pekerja OH 0.0350 75,400.00 2,639.00
Tukang Las Pipa OH 0.0170 97,670.00 1,660.39
Mandor OH 0.0030 121,000.00 363.00
2 BAHAN
Pipa HDPE Ø 63 mm m 1.0000 86,517.07 86,517.07
3 PERALATAN
Mesin Las Pipa HDPE HARI 0.0750 100,000.00 7,500.00
SewSewa Tripot/Tackel HARI 0.0190 100,000.00 1,900.00
1 UPAH
Pekerja OH 0.0350 75,400.00 2,639.00
Tukang Las Pipa OH 0.0170 97,670.00 1,660.39
Mandor OH 0.0030 121,000.00 363.00
2 BAHAN
Pipa HDPE Ø 32 mm m 1.0000 24,413.78 24,413.78
3 PERALATAN
Mesin Las Pipa HDPE HARI 0.0750 100,000.00 7,500.00
SewSewa Tripot/Tackel HARI 0.0190 100,000.00 1,900.00
Volume Panjang Pipa Panjang Total Biaya Kirim Biaya Kirim Biaya Kirim Biaya Kirim Biaya Kirim Biaya Kirim Total Biaya kirim
Harga Pipa di
Container/Truck (Roll / Btg) / Container/Truck dr Jkt ke Sby dr Jkt ke Sby dr Pelbh Sby dr Pelbh Sby dr Pel. di NTT dr Pelbh. di NTT ke lokasi Asuransi Keuntungan Lokasi Perjaan
No. Diameter Harga di Pabrik (m')
(Roll / Batang) (m') (m') (Rp./Truck) (m') ke Pelbh NTT ke Pelbh NTT ke Lokasai ke Lokasi Sementara 0.30% 10%
(Rp./ Container) (m') (Rp./ Truck') (m') (m') (m') (m') (m')
1 2 3 4 5 6 = (4 x 5) 7 8 = (7/6) 9 10 = (9/6) 11 12 = (11/6) 12 = (8+10+12) 13 14 15 =12+13+14
1 PIPA HDPE Ǿ 315 MM 1,462,977.00 60.00 batang 6.00 360.00 3,500,000.00 9,722.22 9,000,000.00 25,000.00 2,000,000.00 5,555.56 40,277.78 4,388.93 146,297.70 1,653,941.40
2 PIPA HDPE Ǿ 250 MM 921,654.00 130.00 batang 6.00 780.00 3,500,000.00 4,487.18 9,000,000.00 11,538.46 2,000,000.00 2,564.10 18,589.74 2,764.96 92,165.40 1,035,174.10
3 PIPA HDPE Ǿ 160 MM 397,206.00 260.00 batang 6.00 1,560.00 3,500,000.00 2,243.59 9,000,000.00 5,769.23 2,000,000.00 1,282.05 9,294.87 1,191.62 39,720.60 447,413.08
4 PIPA HDPE Ǿ 110 MM 178,650.00 520.00 batang 6.00 3,120.00 3,500,000.00 1,121.79 9,000,000.00 2,884.62 2,000,000.00 641.03 4,647.44 535.95 17,865.00 201,698.38
5 PIPA HDPE Ǿ 90 MM 119,853.00 780.00 batang 6.00 4,680.00 3,500,000.00 747.86 9,000,000.00 1,923.08 2,000,000.00 427.35 3,098.29 359.56 11,985.30 135,296.14
6 PIPA HDPE Ǿ 63 MM 65,292.00 20.00 Roll 50.00 1,000.00 3,500,000.00 3,500.00 9,000,000.00 9,000.00 2,000,000.00 2,000.00 14,500.00 195.88 6,529.20 86,517.07
7 PIPA HDPE Ǿ 32 MM 15,561.00 40.00 Roll 50.00 2,000.00 3,500,000.00 1,750.00 9,000,000.00 4,500.00 2,000,000.00 1,000.00 7,250.00 46.68 1,556.10 24,413.78
Volume Panjang Total Biaya Kirim Biaya Kirim Biaya Kirim Biaya Kirim Biaya Kirim Biaya Kirim Total Biaya kirim
Panjang Roll Harga Per Roll Luas per Harga m2 Lokasi
Container/Truck / Container/Truck dr Jkt ke Sby dr Jkt ke Sby dr Pelbh Sby dr Pelbh Sby dr Pel. di NTT dr Pelbh. di NTT ke lokasi Asuransi Keuntungan Lokasi Perjaan Roll Perjaan
No. Diameter Harga di Pabrik
(Roll / Batang) (m') (Roll) (Rp./Truck) (Roll) ke Pelbh NTT ke Pelbh NTT ke Lokasai ke Lokasi Sementara 0.30% 10%
(Rp./ Container) (Roll) (Rp./ Truck') (Roll) (Roll) (Roll) (Roll) (Roll) (m2) (m2)
1 2 3 4 5 6 = (4 x 5) 7 8 = (7/6) 9 10 = (9/6) 11 12 = (11/6) 12 = (8+10+12) 13 14 15 =12+13+14 16 17 =15/16
1 GEOMEMBRAN 170,000,000.00 4.00 Roll 7.00 28.00 3,500,000.00 125,000.00 9,000,000.00 321,428.57 2,000,000.00 71,428.57 517,857.14 510,000.00 17,000,000.00 188,027,857.14 980.00 191,865.16
2 GEOTEKSTILE 25,000,000.00 7.00 Rool 4.00 28.00 3,500,000.00 125,000.00 9,000,000.00 321,428.57 2,000,000.00 71,428.57 517,857.14 75,000.00 2,500,000.00 28,092,857.14 200.00 140,464.29
ANALISA HARGA SATUAN
PEKERJAAN : KEMENTERIAN PERHUBUNGAN
LOKASI : KABUPATEN MANGGARAI TIMUR
ITEM PEKERJAAN : PEKERJAAN 1 M3 PONDASI BAWAH (TELFORD)
HARGA SATUAN : Rp. 295,748.00 M3
1 UPAH
Pekerja L.01 OH 0.0270 75,400.00 2,035.80
Mandor L.04 OH 0.0027 121,000.00 326.70
2 BAHAN
Batu Karang Ukuran 15/20 Cm M3 0.9000 160,964.91 144,868.42
Batu Karang Ukuran 5/7 Cm M3 0.3330 160,964.91 53,601.32
3 PERALATAN
Wheel Loader JAM 0.0244 429,000.00 10,472.48
Dump Truck JAM 0.1381 317,000.00 43,763.92
Tre Wheel Roller JAM 0.0054 203,400.00 1,103.87
Alat Bantu LS 1.0000 1,000.00 1,000.00
1 UPAH
Pekerja L.01 OH 0.0085 75,400.00 640.54
Mandor L.04 OH 0.0012 121,000.00 146.85
2 BAHAN
Agregat Kelas B M3 1.2586 299,000.00 376,324.17
3 PERALATAN
Wheel Loader JAM 0.0085 429,000.00 3,644.45
Dump Truck JAM 0.1109 317,000.00 35,161.78
Motor Grader JAM 0.0043 592,000.00 2,521.60
Tandem Roller JAM 0.0054 431,000.00 2,307.90
Water Tanker JAM 0.0141 320,000.00 4,497.99
Alat Bantu LS 1.0000 1,000.00 1,000.00
1 UPAH
Pekerja L.01 OH 0.0202 75,400.00 1,526.78
Mandor L.04 OH 0.0020 121,000.00 245.01
2 BAHAN
Agregat Kasar M3 1.6690 252,000.00 420,588.00
Agregat Halus M3 0.1479 249,000.00 36,827.10
Aspal KG 98.5857 12,000.00 1,183,028.40
3 PERALATAN
Wheel Loader JAM 0.0071 429,000.00 3,040.40
Dump Truck JAM 0.0754 317,000.00 23,908.60
Tre Wheel Roller JAM 0.0435 203,400.00 8,844.28
Aspal Spayer JAM 0.3788 80,000.00 30,303.03
Alat Bantu LS 1.0000 1,000.00 1,000.00
1 UPAH
Pekerja OH 0.0003 75,400.00 22.44
Mandor OH 0.0001 121,000.00 7.20
2 BAHAN
Aspal M3 0.6790 12,000.00 8,147.71
Kerosene Liter 0.3708 5,000.00 1,854.00
3 PERALATAN
Aspal Distributor JAM 0.0002 235,000.00 47.00
Cpmpresor JAM 0.0002 160,000.00 32.00
1 UPAH
Pekerja L.01 OH 0.4166 75,400.00 31,411.64
Tukang Las L.02 OH 0.2083
Kepala Tukang L.03 OH 0.0208
Mandor L.04 OH 0.0104 121,000.00 1,258.40
2 BAHAN
Batu Karang Ukuran 15/20 Cm M3 0.9000 160,964.91 144,868.42
Batu Karang Ukuran 5/7 Cm M3 0.3330 160,964.91 53,601.32
3 PERALATAN
Wheel Loader JAM 0.0244 429,000.00 10,472.48
Dump Truck JAM 0.1381 317,000.00 43,763.92
Tre Wheel Roller JAM 0.0054 203,400.00 1,103.87
Alat Bantu LS 1.0000 1,000.00 1,000.00
1 UPAH
Pekerja L.01 OH 0.0085 75,400.00 640.54
Mandor L.04 OH 0.0012 121,000.00 146.85
2 BAHAN
Agregat Kelas B M3 1.2586 299,000.00 376,324.17
3 PERALATAN
Wheel Loader JAM 0.0085 429,000.00 3,644.45
Dump Truck JAM 0.1109 317,000.00 35,161.78
Motor Grader JAM 0.0043 592,000.00 2,521.60
Tandem Roller JAM 0.0054 431,000.00 2,307.90
Water Tanker JAM 0.0141 320,000.00 4,497.99
Alat Bantu LS 1.0000 1,000.00 1,000.00
1 UPAH
Pekerja L.01 OH 0.0202 75,400.00 1,526.78
Mandor L.04 OH 0.0020 121,000.00 245.01
2 BAHAN
Agregat Kasar M3 1.6690 252,000.00 420,588.00
Agregat Halus M3 0.1479 249,000.00 36,827.10
Aspal KG 98.5857 12,000.00 1,183,028.40
3 PERALATAN
Wheel Loader JAM 0.0071 429,000.00 3,040.40
Dump Truck JAM 0.0754 317,000.00 23,908.60
Tre Wheel Roller JAM 0.0435 203,400.00 8,844.28
Aspal Spayer JAM 0.3788 80,000.00 30,303.03
Alat Bantu LS 1.0000 1,000.00 1,000.00
1 UPAH
Pekerja OH 0.0003 75,400.00 22.44
Mandor OH 0.0001 121,000.00 7.20
2 BAHAN
Aspal M3 0.6790 12,000.00 8,147.71
Kerosene Liter 0.3708 5,000.00 1,854.00
3 PERALATAN
Aspal Distributor JAM 0.0002 235,000.00 47.00
Cpmpresor JAM 0.0002 160,000.00 32.00
Diameter Pipa Kebutuhan Pipa Biaya Angkut Ongkos Angkut Total Harga
No Harga Pipa (Bascame)
mm Inch (m) (Trasportasi truk) (trip) Onsite/dilokasi Dibulatkan
1 PIPA GIP. Ø 150 MM 2,557,000.00 426,166.67 16,143.50 2,690.58 5,114.00 852.33 383,550.00 63,925.00 2,961,807.50 493,634.58 493,700.00
2 PIPA GIP. Ø 100 MM 1,411,000.00 235,166.67 8,872.05 1,478.67 2,822.00 470.33 211,650.00 35,275.00 1,634,344.05 272,390.67 272,400.00
3 PIPA GIP. Ø 75 MM 994,162.00 165,693.67 5,864.01 977.34 1,988.32 331.39 149,124.30 24,854.05 1,151,138.64 191,856.44 191,900.00
4 PIPA GIP. Ø 50 MM 473,270.00 78,878.33 3,380.78 563.46 946.54 157.76 70,990.50 11,831.75 548,587.82 91,431.30 91,500.00
5 PIPA GIP. Ø 40 MM 363,470.00 60,578.33 3,380.78 563.46 726.94 121.16 54,520.50 9,086.75 422,098.22 70,349.70 70,400.00
6 PIPA GIP.Ø 25 MM 223,650.00 37,275.00 1,574.96 262.49 447.30 74.55 33,547.50 5,591.25 259,219.76 43,203.29 43,300.00
7 PIPA GIP.Ø 20 MM 148,132.00 24,688.67 1,012.68 168.78 296.26 49.38 22,219.80 3,703.30 171,660.75 28,610.12 28,700.00
8 PIPA GIP.Ø 15 MM 112,900.00 18,816.67 779.82 129.97 22.58 3.76 16,935.00 2,822.50 130,637.40 21,772.90 21,800.00
PIPA GIP 50 MM
ANALISA MATERIAL ON SITE
I PEKERJAAN PERSIAPAN
Jumlah ( A + B ) 70,450.00
Over Head dan Keuntungan 15 % 10,567.50
Total Harga 81,017.50
A Tenaga
- Pekerja Oh 0.40 66,000.00 26,400.00
- Mandor Oh 0.04 120,000.00 4,800.00
Jumlah (A) 31,200.00
B Alat
- Alat Bantu Ls 1.00 500.00 500.00
Jumlah (B) 500.00
Jumlah (A)+(B) 31,700.00
Over Head dan Keuntungan 15 % 4,755.00
Total Harga 36,455.00
A Tenaga
- Pekerja Oh 1.000 66,000.00 66,000.00
- Mandor Oh 0.033 120,000.00 3,960.00
Jumlah (A) 69,960.00
Jumlah ( A ) 69,960.00
Over Head dan Keuntungan 15 % 10,494.00
Total Harga 80,454.00
3 1 M³ Galian Tanah Cadas
A Tenaga
- Pekerja Oh 1.500 66,000.00 99,000.00
- Mandor Oh 0.015 120,000.00 1,800.00
Jumlah (A) 100,800.00
Jumlah ( A ) 100,800.00
Over Head dan Keuntungan 15 % 15,120.00
Total Harga 115,920.00
A Tenaga
- Pekerja Oh 0.500 66,000.00 33,000.00
- Mandor Oh 0.050 120,000.00 6,000.00
Jumlah ( A + B ) 39,000.00
Over Head dan Keuntungan 15 % 5,850.00
Total Harga 44,850.00
A Tenaga
- Pekerja Oh 0.500 66,000.00 33,000.00
- Mandor Oh 0.050 120,000.00 6,000.00
Jumlah ( A + B ) 227,000.00
Over Head dan Keuntungan 15 % 34,050.00
Total Harga 261,050.00
Harga Jumlah
No. Uraian Kegiatan Satuan Koefisien
Satuan Dasar (Rp.) Harga ( Rp. )
4 1 M³ Urugan Pasir
A Bahan
- Pasir Urug M3 1.200 194,800.00 233,760.00
Jumlah (A) 233,760.00
B Tenaga
- Pekerja Oh 0.300 66,000.00 19,800.00
- Mandor Oh 0.010 120,000.00 1,200.00
Jumlah (B) 21,000.00
Jumlah ( A + B ) 254,760.00
Over Head dan Keuntungan 15 % 38,214.00
Total Harga 292,974.00
III PEKERJAAN PASANGAN
A Bahan
- Batu Kali M3 1.100 189,876.08 208,863.68
- Semen Portland Kg 163.000 1,245.14 202,957.88
- Pasir Pasang M3 0.520 393,156.86 204,441.57
Jumlah (A) 616,263.13
B Tenaga
- Pekerja Oh 1.500 66,000.00 99,000.00
- Tukang Batu Oh 0.600 116,000.00 69,600.00
- Kepala Tukang Oh 0.060 120,000.00 7,200.00
- Mandor Oh 0.075 120,000.00 9,000.00
Jumlah (B) 184,800.00
Jumlah ( A + B ) 801,063.13
Over Head dan Keuntungan 15 % 120,159.47
Total Harga 921,222.60
A Bahan
- Batu Kali M3 1.100 189,876.08 208,863.68
- Semen Portland Kg 202.000 1,245.14 251,518.35
- Pasir Pasang M3 0.485 393,156.86 190,681.08
Jumlah (A) 651,063.11
B Tenaga
- Pekerja Oh 1.500 66,000.00 99,000.00
- Tukang Batu Oh 0.600 116,000.00 69,600.00
- Kepala Tukang Oh 0.060 120,000.00 7,200.00
- Mandor Oh 0.075 120,000.00 9,000.00
Jumlah (B) 184,800.00
Jumlah ( A + B ) 835,863.11
Over Head dan Keuntungan 15 % 125,379.47
Total Harga 961,242.58
Harga Jumlah
No. Uraian Kegiatan Satuan Koefisien
Satuan Dasar (Rp.) Harga ( Rp. )
A Bahan
- Batu Kali M3 1.100 189,876.08 208,863.68
- Semen Portland Kg 267.000 1,245.14 332,452.47
- Pasir Pasang M3 0.427 393,156.86 167,877.98
Jumlah (A) 709,194.14
B Tenaga
- Pekerja Oh 1.500 66,000.00 99,000.00
- Tukang Batu Oh 0.600 116,000.00 69,600.00
- Kepala Tukang Oh 0.060 120,000.00 7,200.00
- Mandor Oh 0.075 120,000.00 9,000.00
Jumlah (B) 184,800.00
Jumlah ( A + B ) 893,994.14
Over Head dan Keuntungan 15 % 134,099.12
Total Harga 1,028,093.26
A Bahan
- Batu Kali M3 1.200 189,876.08 227,851.29
- Pasir Urug M3 0.300 194,800.00 58,440.00
Jumlah (A) 286,291.29
B Tenaga
- Pekerja Oh 0.780 66,000.00 51,480.00
- Tukang Batu Oh 0.390 116,000.00 45,240.00
- Kepala Tukang Oh 0.039 120,000.00 4,680.00
- Mandor Oh 0.039 120,000.00 4,680.00
Jumlah (B) 106,080.00
Jumlah ( A + B ) 392,371.29
Over Head dan Keuntungan 15 % 58,855.69
Total Harga 451,226.98
A Bahan
- Bata Merah Bh 70.000 2,500.00 175,000.00
- Semen Portland Kg 18.950 1,245.14 23,595.41
- Pasir Pasang M3 0.038 393,156.86 14,939.96
Jumlah (A) 213,535.37
B Tenaga
- Pekerja Oh 0.320 66,000.00 21,120.00
- Tukang Batu Oh 0.100 116,000.00 11,600.00
- Kepala Tukang Oh 0.010 120,000.00 1,200.00
- Mandor Oh 0.015 120,000.00 1,800.00
Jumlah (B) 35,720.00
Jumlah ( A + B ) 249,255.37
Over Head dan Keuntungan 15 % 37,388.31
Total Harga 286,643.68
Harga Jumlah
No. Uraian Kegiatan Satuan Koefisien
Satuan Dasar (Rp.) Harga ( Rp. )
A Bahan
- Bata Merah Bh 70.000 2,500.00 175,000.00
- Semen Portland Kg 14.370 1,245.14 17,892.67
- Pasir Pasang M3 0.040 393,156.86 15,726.27
Jumlah (A) 208,618.94
B Tenaga
- Pekerja Oh 0.320 66,000.00 21,120.00
- Tukang Batu Oh 0.100 116,000.00 11,600.00
- Kepala Tukang Oh 0.010 120,000.00 1,200.00
- Mandor Oh 0.015 120,000.00 1,800.00
Jumlah (B) 35,720.00
Jumlah ( A + B ) 244,338.94
Over Head dan Keuntungan 15 % 36,650.84
Total Harga 280,989.78
A Bahan
- Bata Merah Bh 70.000 2,500.00 175,000.00
- Semen Portland Kg 11.500 1,245.14 14,319.11
- Pasir Pasang M3 0.043 393,156.86 16,905.75
Jumlah (A) 206,224.86
B Tenaga
- Pekerja Oh 0.320 66,000.00 21,120.00
- Tukang Batu Oh 0.100 116,000.00 11,600.00
- Kepala Tukang Oh 0.010 120,000.00 1,200.00
- Mandor Oh 0.015 120,000.00 1,800.00
Jumlah (B) 35,720.00
Jumlah ( A + B ) 241,944.86
Over Head dan Keuntungan 15 % 36,291.73
Total Harga 278,236.59
A Bahan
- Water stop Lebar 20 cm M' 1.050 45,000.00 47,250.00
Jumlah (A) 47,250.00
B Tenaga
- Pekerja Oh 0.550 66,000.00 36,300.00
- Tukang Batu Oh 0.035 116,000.00 4,060.00
- Mandor Oh 0.003 120,000.00 360.00
Jumlah (B) 40,720.00
Jumlah ( A + B ) 87,970.00
Over Head dan Keuntungan 15 % 13,195.50
Total Harga 101,165.50
Harga Jumlah
No. Uraian Kegiatan Satuan Koefisien
Satuan Dasar (Rp.) Harga ( Rp. )
A Bahan
- Semen Portland Kg 8.520 1,245.14 10,608.60
- Pasir Pasang M3 0.017 393,156.86 6,683.67
Jumlah (A) 17,292.26
B Tenaga
- Pekerja Oh 0.200 66,000.00 13,200.00
- Tukang Batu Oh 0.150 40,000.00 6,000.00
- Kepala Tukang Oh 0.015 50,000.00 750.00
- Mandor Oh 0.010 120,000.00 1,200.00
Jumlah (B) 21,150.00
Jumlah ( A + B ) 38,442.26
Over Head dan Keuntungan 15 % 5,766.34
Total Harga 44,208.60
A Bahan
- Semen Portland Kg 6.480 1,245.14 8,068.51
- Pasir Pasang M3 0.019 393,156.86 7,469.98
Jumlah (A) 15,538.49
B Tenaga
- Pekerja Oh 0.200 66,000.00 13,200.00
- Tukang Batu Oh 0.150 40,000.00 6,000.00
- Kepala Tukang Oh 0.015 50,000.00 750.00
- Mandor Oh 0.010 120,000.00 1,200.00
Jumlah (B) 21,150.00
Jumlah ( A + B ) 36,688.49
Over Head dan Keuntungan 15 % 5,503.27
Total Harga 42,191.76
A Bahan
- Semen Portland Kg 5.200 1,245.14 6,474.73
- Pasir Pasang M3 0.020 393,156.86 7,863.14
Jumlah (A) 14,337.87
B Tenaga
- Pekerja Oh 0.200 66,000.00 13,200.00
- Tukang Batu Oh 0.150 40,000.00 6,000.00
- Kepala Tukang Oh 0.015 50,000.00 750.00
- Mandor Oh 0.010 120,000.00 1,200.00
Jumlah (B) 21,150.00
Jumlah ( A + B ) 35,487.87
Over Head dan Keuntungan 15 % 5,323.18
Total Harga 40,811.05
Harga Jumlah
No. Uraian Kegiatan Satuan Koefisien
Satuan Dasar (Rp.) Harga ( Rp. )
A Bahan
- Semen Portland Kg 9.300 1,245.14 11,579.81
- Pasir Pasang M3 0.018 393,156.86 7,076.82
Jumlah (A) 18,656.63
B Tenaga
- Pekerja Oh 0.260 66,000.00 17,160.00
- Tukang Batu Oh 0.200 40,000.00 8,000.00
- Kepala Tukang Oh 0.020 50,000.00 1,000.00
- Mandor Oh 0.013 120,000.00 1,560.00
Jumlah (B) 27,720.00
Jumlah ( A + B ) 46,376.63
Over Head dan Keuntungan 15 % 6,956.49
Total Harga 53,333.12
5 1 M² Acian
A Bahan
- Semen Portland Kg 5.600 1,245.14 6,972.79
Jumlah (A) 6,972.79
B Tenaga
- Pekerja Oh 0.150 66,000.00 9,900.00
- Tukang Batu Oh 0.070 40,000.00 2,800.00
- Kepala Tukang Oh 0.007 50,000.00 350.00
- Mandor Oh 0.008 120,000.00 960.00
Jumlah (B) 14,010.00
Jumlah ( A + B ) 20,982.79
Over Head dan Keuntungan 15 % 3,147.42
Total Harga 24,130.20
V PEKERJAAN BETON
A Bahan
- Semen Portland Kg 218.000 1,245.14 271,440.60
- Pasir Beton M3 0.520 393,156.86 204,441.57
- Koral Beton M3 0.870 399,800.00 347,826.00
Jumlah (A) 823,708.17
B Tenaga
- Pekerja Oh 1.650 66,000.00 108,900.00
- Tukang Batu Oh 0.250 40,000.00 10,000.00
- Kepala Tukang Oh 0.025 50,000.00 1,250.00
- Mandor Oh 0.080 120,000.00 9,600.00
Jumlah (B) 129,750.00
Jumlah ( A + B ) 953,458.17
Over Head dan Keuntungan 15 % 143,018.72
Total Harga 1,096,476.89
Harga Jumlah
No. Uraian Kegiatan Satuan Koefisien
Satuan Dasar (Rp.) Harga ( Rp. )
A Bahan
- Semen Portland Kg 232.000 1,245.14 288,872.56
- Pasir Beton M3 0.540 393,156.86 212,304.71
- Koral Beton M3 0.810 399,800.00 323,838.00
Jumlah (A) 825,015.27
B Tenaga
- Pekerja Oh 3.000 66,000.00 198,000.00
- Tukang Batu Oh 1.000 40,000.00 40,000.00
- Kepala Tukang Oh 0.350 50,000.00 17,500.00
- Mandor Oh 0.040 120,000.00 4,800.00
Jumlah (B) 260,300.00
Jumlah ( A + B ) 1,085,315.27
Over Head dan Keuntungan 15 % 162,797.29
Total Harga 1,248,112.56
Jumlah ( 1 + 2 ) 2,256,458.17
Over Head dan Keuntungan 15 % 338,468.72
Total Harga 2,594,926.89
Harga Jumlah
No. Uraian Kegiatan Satuan Koefisien
Satuan Dasar (Rp.) Harga ( Rp. )
Jumlah ( 1 + 2 + 3 ) 4,759,158.13
Over Head dan Keuntungan 15 % 713,873.72
Total Harga 5,473,031.85
Harga Jumlah
No. Uraian Kegiatan Satuan Koefisien
Satuan Dasar (Rp.) Harga ( Rp. )
Jumlah ( 1 + 2 + 3 ) 4,931,251.90
Over Head dan Keuntungan 15 % 739,687.79
Total Harga 5,670,939.69
VI PEKERJAAN KAYU
Harga Jumlah
No. Uraian Kegiatan Satuan Koefisien
Satuan Dasar (Rp.) Harga ( Rp. )
Jumlah ( A + B ) 5,102,000.00
Over Head dan Keuntungan 15 % 510,200.00
Total Harga 5,612,200.00
Jumlah ( A + B ) 444,500.00
Over Head dan Keuntungan 15 % 66,675.00
Total Harga 511,175.00
Jumlah ( A + B ) 344,500.00
Over Head dan Keuntungan 15 % 51,675.00
Total Harga 396,175.00
Jumlah ( A + B ) 375,100.00
Over Head dan Keuntungan 15 % 56,265.00
Total Harga 431,365.00
Harga Jumlah
No. Uraian Kegiatan Satuan Koefisien
Satuan Dasar (Rp.) Harga ( Rp. )
Jumlah ( A + B ) 287,600.00
Over Head dan Keuntungan 15 % 43,140.00
Total Harga 330,740.00
Jumlah ( A + B ) 653,000.00
Over Head dan Keuntungan 15 % 97,950.00
Total Harga 750,950.00
Jumlah ( A + B ) 493,000.00
Over Head dan Keuntungan 15 % 73,950.00
Total Harga 566,950.00
Jumlah ( A + B ) 334,350.00
Over Head dan Keuntungan 15 % 50,152.50
Total Harga 384,502.50
Jumlah ( A + B ) 4,954,500.00
Over Head dan Keuntungan 15 % 743,175.00
Total Harga 5,697,675.00
Jumlah ( A + B ) 73,900.00
Over Head dan Keuntungan 15 % 11,085.00
Total Harga 84,985.00
Harga Jumlah
No. Uraian Kegiatan Satuan Koefisien
Satuan Dasar (Rp.) Harga ( Rp. )
Jumlah ( A + B ) 45,875.00
Over Head dan Keuntungan 15 % 6,881.25
Total Harga 52,756.25
Jumlah ( A + B ) 62,635.00
Over Head dan Keuntungan 15 % 9,395.25
Total Harga 72,030.25
Jumlah ( A + B ) 90,750.00
Over Head dan Keuntungan 15 % 13,612.50
Total Harga 104,362.50
Jumlah ( A + B ) 259,670.00
Over Head dan Keuntungan 15 % 38,950.50
Total Harga 298,620.50
Jumlah ( A + B ) 146,760.00
Over Head dan Keuntungan 15 % 22,014.00
Total Harga 168,774.00
Harga Jumlah
No. Uraian Kegiatan Satuan Koefisien
Satuan Dasar (Rp.) Harga ( Rp. )
Jumlah ( A + B ) 32,830.00
Over Head dan Keuntungan 15 % 4,924.50
Total Harga 37,754.50
Jumlah ( A + B ) 25,220.00
Over Head dan Keuntungan 15 % 3,783.00
Total Harga 29,003.00
4 1 Bh Pasang Grendel
A Bahan
- Grendel Bh 1.000 12,500.00 12,500.00
Jumlah (A) 12,500.00
B Tenaga
- Pekerja Oh 0.015 66,000.00 990.00
- Tukang Kayu Oh 0.150 40,000.00 6,000.00
- Kepala Tukang Oh 0.015 50,000.00 750.00
- Mandor Oh 0.001 120,000.00 90.00
Jumlah (B) 7,830.00
Jumlah ( A + B ) 20,330.00
Over Head dan Keuntungan 15 % 3,049.50
Total Harga 23,379.50
Jumlah ( A + B ) 22,830.00
Over Head dan Keuntungan 15 % 3,424.50
Total Harga 26,254.50
Harga Jumlah
No. Uraian Kegiatan Satuan Koefisien
Satuan Dasar (Rp.) Harga ( Rp. )
A Tenaga
- Pekerja Orang 0.350 66,000.00 23,100.00
- Mandor Orang 0.025 120,000.00 3,000.00
- Tukang Kayu Orang 0.500 40,000.00 20,000.00
- Kepala Tukang Orang 0.050 120,000.00 6,000.00
Jumlah (A) 52,100.00
B Bahan
- Seng Gelombang Lembar 0.750 39,000.00 29,250.00
- Paku Seng Kg 0.010 35,000.00 350.00
Jumlah (B) 29,600.00
Jumlah ( A + B ) 81,700.00
Over Head dan Keuntungan 15 % 12,255.00
Total Harga 93,955.00
A Tenaga
- Pekerja Orang 0.280 66,000.00 18,480.00
- Mandor Orang 0.020 120,000.00 2,400.00
- Tukang Kayu Orang 0.280 40,000.00 11,200.00
- Kepala Tukang Orang 0.028 120,000.00 3,360.00
Jumlah (A) 35,440.00
B Bahan
- Seng Datar Lembar 0.400 38,000.00 15,200.00
- Paku seng Kg 0.080 35,000.00 2,800.00
Jumlah (B) 18,000.00
Jumlah ( A + B ) 53,440.00
Over Head dan Keuntungan 15 % 8,016.00
Total Harga 61,456.00
Harga Jumlah
No. Uraian Kegiatan Satuan Koefisien
Satuan Dasar (Rp.) Harga ( Rp. )
IX PEKERJAAN LANTAI
Jumlah ( A + B ) 309,370.00
Over Head dan Keuntungan 15 % 46,405.50
Total Harga 355,775.50
Jumlah ( A + B ) 309,370.00
Over Head dan Keuntungan 15 % 46,405.50
Total Harga 355,775.50
Jumlah ( A + B ) 241,870.00
Over Head dan Keuntungan 15 % 36,280.50
Total Harga 278,150.50
Harga Jumlah
No. Uraian Kegiatan Satuan Koefisien
Satuan Dasar (Rp.) Harga ( Rp. )
X PEKERJAAN PENGECATAN
Jumlah ( A + B ) 27,828.00
Over Head dan Keuntungan 15 % 4,174.20
Total Harga 32,002.20
Jumlah ( A + B ) 31,470.00
Over Head dan Keuntungan 15 % 4,720.50
Total Harga 36,190.50
3 1 M² Pengecatan Kayu
A Bahan
- Cat Meni Kg 0.200 30,000.00 6,000.00
- Plamir Kayu Kg 0.150 40,000.00 6,000.00
- Cat Dasar Kg 0.170 44,000.00 7,480.00
- Cat Penutup Kg 0.260 44,000.00 11,440.00
Jumlah (A) 30,920.00
B Tenaga
- Pekerja Oh 0.070 66,000.00 4,620.00
- Tukang Cat Oh 0.009 116,000.00 1,044.00
- Kepala Tukang Oh 0.006 120,000.00 720.00
- Mandor Oh 0.003 120,000.00 300.00
Jumlah (B) 6,684.00
Jumlah ( A + B ) 37,604.00
Over Head dan Keuntungan 15 % 5,640.60
Total Harga 43,244.60
Harga Jumlah
No. Uraian Kegiatan Satuan Koefisien
Satuan Dasar (Rp.) Harga ( Rp. )
3 1 M² Pengecatan Tembok
A Bahan
- Plamir Tembok Bh 0.100 45,000.00 4,500.00
- Cat Tembok Kg 0.360 19,000.00 6,840.00
Jumlah (A) 11,340.00
B Tenaga
- Pekerja Oh 0.020 66,000.00 1,320.00
- Tukang Cat Oh 0.063 116,000.00 7,308.00
- Kepala Tukang Oh 0.063 120,000.00 7,560.00
- Mandor Oh 0.003 120,000.00 300.00
Jumlah (B) 16,488.00
Jumlah ( A + B ) 27,828.00
Over Head dan Keuntungan 15 % 4,174.20
Total Harga 32,002.20
XI PENYAMBUNGAN PIPA
Harga Jumlah
No. Uraian Kegiatan Satuan Koefisien
Satuan Dasar (Rp.) Harga ( Rp. )
Jumlah ( A + B ) 916,813.00
Over Head dan Keuntungan 15 % 137,521.95
###
Total Harga 1,054,334.95
Harga Satuan Pekerjaan Per Meter 175,722.49
Jumlah ( A + B ) 550,172.58
Over Head dan Keuntungan 15 % 82,525.89
Total Harga 632,698.47
Harga Satuan Pekerjaan Per Meter 105,449.74
Jumlah ( A + B ) 366,626.29
Over Head dan Keuntungan 15 % 54,993.94
Total Harga 421,620.23
Harga Satuan Pekerjaan Per Meter 70,270.04
Harga Jumlah
No. Uraian Kegiatan Satuan Koefisien
Satuan Dasar (Rp.) Harga ( Rp. )
Jumlah ( A + B ) 166,471.00
Over Head dan Keuntungan 15 % 24,970.65
Total Harga 191,441.65
Harga Satuan Pekerjaan Per Meter 31,906.94
Jumlah ( A + B ) 149,745.00
Over Head dan Keuntungan 15 % 22,461.75
Total Harga 172,206.75
Harga Satuan Pekerjaan Per Meter 28,701.13
Jumlah ( A + B ) 18,718.00
Over Head dan Keuntungan 15 % 2,807.70
Total Harga 21,525.70
Jumlah ( A + B ) 14,418.00
Over Head dan Keuntungan 15 % 2,162.70
Total Harga 16,580.70
Jumlah ( A + B ) 8,798.00
Over Head dan Keuntungan 15 % 1,319.70
Total Harga 10,117.70
12 1 Titik Pengelasan Pipa GIP. Ø 150 mm
1 Titik Pengelasan Sambungan Pipa GIP. Ø 150 mm
A Tenaga
- Pekerja Oh 4.8480 66,000.00 319,968.00
- Tukang Las Oh 1.2120 116,000.00 140,592.00
- Kepala Tukang Oh 0.1212 120,000.00 14,544.00
- Mandor Oh 0.0606 120,000.00 7,272.00
Jumlah (A) 482,376.00
B Bahan
- Kawat Las Btg 20.7429 2,500.00 51,857.25
Jumlah (B) 51,857.25
C Peralatan
- Mesin Las Listrik Hr 0.1500 432,694.44 64,904.17
- Alat Bantu Hr 0.3121 100,000.00 31,209.00
Jumlah (3) 96,113.17
Jumlah ( A + B + C ) 630,346.42
Over Head dan Keuntungan 15 % 94,551.96
Total Harga 724,898.38
Jumlah ( A + B + C ) 1,121,000.18
Over Head dan Keuntungan 15 % 168,150.03
Total Harga 1,289,150.21
Harga Satuan Pekerjaan Per Meter 2,578.30
Harga Jumlah
No. Uraian Kegiatan Satuan Koefisien
Satuan Dasar (Rp.) Harga ( Rp. )
Jumlah ( A + B + C ) 752,440.14
Over Head dan Keuntungan 15 % 112,866.02
Total Harga 865,306.16
Harga Satuan Pekerjaan Per Meter 1,730.61
Jumlah ( A + B + C ) 442,750.09
Over Head dan Keuntungan 15 % 66,412.51
Total Harga 509,162.60
Harga Satuan Pekerjaan Per Meter 1,018.33
Harga Jumlah
No. Uraian Kegiatan Satuan Koefisien
Satuan Dasar (Rp.) Harga ( Rp. )
Jumlah ( A + B + C ) 321,023.07
Over Head dan Keuntungan 15 % 48,153.46
Total Harga 369,176.53
Harga Satuan Pekerjaan Per Meter 738.35
Jumlah ( A + B + C ) 221,375.05
Over Head dan Keuntungan 15 % 33,206.26
Total Harga 254,581.30
Harga Satuan Pekerjaan Per Meter 509.16
Jumlah ( A + B + C ) 162,097.50
Over Head dan Keuntungan 15 % 24,314.62
Total Harga 186,412.12
Harga Satuan Pekerjaan Per Meter 372.82
Jumlah ( A + B + C ) 102,727.26
Over Head dan Keuntungan 15 % 15,409.09
Total Harga 118,136.34
Harga Satuan Pekerjaan Per Meter 236.27
7 Pekerjaan Jembatan
1 Kg Erection Baja WF
A Peralatan
- Alat bantu Ls 1.000 250.00 250.00
Jumlah (A) 250.00
B Tenaga
- Pekerja Oh 0.075 66,000.00 4,950.00
- Tukang Oh 0.008 116,000.00 870.00
- Kepala Tukang Oh 0.005 120,000.00 600.00
- Mandor Oh 0.004 120,000.00 450.00
Jumlah (B) 6,870.00
Jumlah ( A + B ) 577,052.35
Over Head dan Keuntungan 15 % 86,557.85
Total Harga 663,610.20
Harga Jumlah
No. Uraian Kegiatan Satuan Koefisien
Satuan Dasar (Rp.) Harga ( Rp. )
Jumlah ( A + B + C ) 120,066.80
Over Head dan Keuntungan 15 % 18,010.02
Total Harga 138,076.82
Harga Satuan Pekerjaan Per Meter 138,076.82
ANALISA BIAYA ANGKUTAN
( M' ) (Km) (Km) (Km) ( Jam ) ( Menit ) ( Menit ) ( Org ) ( Jam ) ( Jam ) ( Truck ) ( Rp ) ( Kg ) ( Kg ) ( Kg ) ( Btg ) ( Btg ) ( Btg ) ( RP. ) ( RP. ) ( Org ) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7 8 9 10 11 = (17 / 25 ) 12 = (9+10)x(11x2)/60 13 = (5/(6+7)/2)+12 14 = (8/13) 15 16 17 = (6x16) 18 19 = (18/17) 20 = (4/6) 21 = (14x19) 22 = (14x15)/21 23 24 = 11 25 = (23x24)/21 26 = (22+25) 27 = (26/6)
1 Pipa GIP.Ǿ15 mm M' 6.00 126.60 30.00 45.00 7.00 6.00 4.00 0.29 0.10 0.94 7.43 317,000.00 1.22 7.32 3,000.00 409.84 1.00 3,046.78 773.48 66,000.00 0.29 6.34 779.82 129.97
2 Pipa GIP.Ǿ20 mm M' 6.00 126.60 30.00 45.00 7.00 6.00 4.00 0.38 0.13 0.97 7.21 317,000.00 1.58 9.48 3,000.00 316.46 1.00 2,282.76 1,001.72 66,000.00 0.38 10.96 1,012.68 168.78
3 Pipa GIP.Ǿ25 mm M' 6.00 126.60 30.00 45.00 7.00 6.00 4.00 0.59 0.20 1.04 6.74 317,000.00 2.44 14.64 3,000.00 204.92 1.00 1,380.32 1,546.96 66,000.00 0.59 28.00 1,574.96 262.49
4 Pipa GIP.Ǿ40 mm M' 6.00 126.60 30.00 45.00 7.00 6.00 4.00 1.22 0.41 1.25 5.59 317,000.00 5.10 30.60 3,000.00 98.04 1.00 548.14 3,233.40 66,000.00 1.22 147.38 3,380.78 563.46
5 Pipa GIP.Ǿ50 mm M' 6.00 126.60 30.00 45.00 7.00 6.00 4.00 1.22 0.41 1.25 5.59 317,000.00 5.10 30.60 3,000.00 98.04 1.00 548.14 3,233.40 66,000.00 1.22 147.38 3,380.78 563.46
6 Pipa GIP.Ǿ75 mm M' 6.00 126.60 30.00 45.00 7.00 6.00 4.00 2.03 0.68 1.52 4.60 317,000.00 8.47 50.82 3,000.00 59.03 1.00 271.57 5,369.98 66,000.00 2.03 494.03 5,864.01 977.34
7 Pipa GIP.Ǿ100 mm M' 6.00 126.60 30.00 45.00 7.00 6.00 4.00 2.90 0.97 1.81 3.86 317,000.00 12.10 72.60 3,000.00 41.32 1.00 159.63 7,671.40 66,000.00 2.90 1,200.65 8,872.05 1,478.67
8 Pipa GIP.Ǿ150 mm M' 6.00 126.60 30.00 45.00 7.00 6.00 4.00 4.61 1.54 2.38 2.94 317,000.00 19.20 115.20 3,000.00 26.04 1.00 76.59 12,172.80 66,000.00 4.61 3,970.70 16,143.50 2,690.58
ANALISA MATERIAL ON SITE
1 HARGA SEMEN PER KG DI LOKASI PEKERJAAN
A 1 Kg Harga Semen dan Biaya Angkut sd lokasi yang dapat di akses kendaraan
- Jarak angkut PP = 30.00 Km
- Kecepatan truck rata-rata dengan muatan per jam = 50.00 Km
- Kecepatan truck rata-rata tanpa muatan per jam = 45.00 Km
- Kecepatan truck rata-rata per jam = 47.50 Km
- Kapasitas angkut truk = 3,000.00 Kg
- Waktu per trip + fixed time = 1.63 Jam
- Jumlah jam efektif per hari = 7.00 Jam
- Jumlah trip per Hari = 4.29 Trip
- Berat per zak semen = 40.00 Kg
- Kapasitas angkut per trip per truck = 75.00 Zak
- Sewa truck per trip = 317,000.00 Rp.
- Produksi per hari = 321.77 Zak
- Ongkos angkut ke lokasi per zak = 985.16 Rp.
- Harga upah pekerja = 66,000.00 Rp.
- Jumlah pekerja bongkar muatan = 4.00 Orang
- Biaya bongkar muat per zak = 820.45 Rp.
- Harga Semen per zak = 48,000.00 Rp.
- Ongkos Angkut ke Lokasi per zak = 985.16 Rp.
- Ongkos Bongkar Muat per zak = 820.45 Rp.
- Jumlah Harga Semen per zak di lokasi ( q + r + s ) = 49,805.61 Rp.
A. URAIAN PERALATAN
1 Jenis Peralatan MESIN LAS PIPA HDPE
2 Tenaga Pw 8.00 HP
3 Kapasitas Cp Ton
4 Alat Bekas a. Umur Ekonomi A 4.00 Tahun
b. Jam Kerja dalam 1 tahun W 1,440.00 Jam
c. Harga Alat B 20,000,000.00 Rupiah
5 Alat Yang Dipakai a. Umur Ekonomi A' Tahun
b. Jam Kerja dalam 1 tahun W' Jam
c. Harga Alat (*) B' Rupiah
E LAIN - LAIN
1 Tingkat Suku Bunga I 10.00 % / Tahun
2 Upah Operator / Sopir U1 8,066.67 Rp./Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 3,590.48 Rp./Jam
4 Bahan Bakar Bensin Mb Liter
5 Bahan Bakar Solar Ms Liter
6 Minyak Pelumas Mp Liter
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1 Jenis Peralatan MESIN LAS LISTRIK
2 Tenaga Pw HP
3 Kapasitas Cp Ton
4 Alat Bekas a. Umur Ekonomi A 4.00 Tahun
b. Jam Kerja dalam 1 tahun W 1,440.00 Jam
c. Harga Alat B 15,000,000.00 Rupiah
5 Alat Yang Dipakai a. Umur Ekonomi A' Tahun
b. Jam Kerja dalam 1 tahun W' Jam
c. Harga Alat (*) B' Rupiah
E LAIN - LAIN
1 Tingkat Suku Bunga I 10.00 % / Tahun
2 Upah Operator / Sopir U1 5,714.29 Rp./Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 4,571.43 Rp./Jam
4 Bahan Bakar Bensin Mb Liter
5 Bahan Bakar Solar Ms Liter
6 Minyak Pelumas Mp Liter
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1 Jenis Peralatan POMPA TEST TEKAN
2 Tenaga Pw 2.00 HP
3 Kapasitas Cp Ton
4 Alat Bekas a. Umur Ekonomi A 4.00 Tahun
b. Jam Kerja dalam 1 tahun W 1,440.00 Jam
c. Harga Alat B 9,000,000.00 Rupiah
5 Alat Yang Dipakai a. Umur Ekonomi A' Tahun
b. Jam Kerja dalam 1 tahun W' Jam
c. Harga Alat (*) B' Rupiah
E LAIN - LAIN
1 Tingkat Suku Bunga I 10.00 % / Tahun
2 Upah Operator / Sopir U1 5,714.29 Rp./Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 4,571.43 Rp./Jam
4 Bahan Bakar Bensin Mb 5,000.00 Liter
5 Bahan Bakar Solar Ms 5,000.00 Liter
6 Minyak Pelumas Mp 25,000.00 Liter