Anda di halaman 1dari 3

PEMERINTAH KABUPATEN KUTAI TIMUR

CL DINAS PEKERJAAN UMUM


BIDANG BINA MARGA
Kawasan Pemerintahan Bukit Pelangi - Sengata

KEGIATAN :

PENINGKATAN JALAN

PEKERJAAN :

Peningkatan Jalan H. M Ardan


( KM. 1 )

Typical Potongan Melintang ( Existing ) LOKASI :

SANGATTA

MENGETAHUI / DISETUJUI :

PEJABAT PEMBUAT KOMITMEN

CL

Asran Lode, ST
NIP. ....................

Konsultan Pengawas
PT. Tectical Global Consultan

Andra Setya, ST
Site Engineer

DIBUAT :

Typical Cross ( Rencana Pelebaran) Kontraktor Pelaksana


PT. Kaltim Bumi Lestari
SCALA 1 : 50

Ir. H. Ahmad D
General Superintenden
CATATAN :

CL

JABATAN NAMA PARAF

JUDUL GAMBAR SKALA

H : 100
Typical Cross V : 100

Typical Cross ( Rencana Tikungan )


KODE GAMBAR NO. GAMBAR JML. GAMBAR

CS-1 1 12
SCALA 1 : 50
REVISI TANGGAL
DATA LEBAR ASPHAL PENINGKATAN JALAN H. M ARDAN ( KM.01 ) SANGATTA
Asphal ( Badan Jalan ) Rencana Pelebaran
STA 3.5 4.5 Ket
Existing Kanan Kiri Rencana Kanan Kiri
0+000 5.60 3.002 2.598 7.00 0.50 0.90
0+025 5.25 2.930 2.320 7.00 0.57 1.18
0+050 5.20 2.602 2.598 7.00 0.90 0.90
0+075 4.85 2.415 2.435 7.00 1.09 1.07
0+100 4.50 2.330 2.170 7.00 1.17 1.33
0+125 4.70 2.185 2.515 7.00 1.32 0.99
0+150 4.65 2.056 2.594 7.00 1.44 0.91
0+175 4.65 2.050 2.600 7.00 1.45 0.90
0+200 4.65 2.150 2.500 7.00 1.35 1.00
0+225 4.50 2.251 2.249 7.00 1.25 1.25
0+250 4.45 2.184 2.266 7.00 1.32 1.23
0+275 4.62 2.292 2.328 7.00 1.21 1.17
0+300 4.68 2.230 2.450 7.00 1.27 1.05
0+325 4.66 2.340 2.320 7.00 1.16 1.18
0+350 4.40 2.216 2.184 7.00 1.28 1.32
0+375 4.42 2.190 2.230 7.00 1.31 1.27
0+400 4.43 2.110 2.320 7.00 1.39 1.18
0+425 4.45 2.040 2.410 7.00 1.46 1.09
0+450 4.47 2.204 2.267 7.00 1.30 1.23
0+475 4.42 2.297 2.123 7.00 1.20 1.38
0+500 4.58 2.283 2.297 7.00 1.22 1.20
0+525 4.56 2.379 2.181 7.00 1.12 1.32
0+550 4.56 2.250 2.311 7.00 1.25 1.19
0+575 4.56 2.120 2.440 7.00 1.38 1.06
0+600 4.50 2.382 2.118 7.00 1.12 1.38
0+625 4.50 2.081 2.419 7.00 1.42 1.08
0+650 4.68 2.490 2.190 7.00 1.01 1.31
0+675 4.50 2.181 2.319 7.00 1.32 1.18
0+700 4.50 2.181 2.319 7.00 1.32 1.18
0+725 4.45 2.212 2.238 7.00 1.29 1.26
0+750 4.37 2.152 2.218 7.00 1.35 1.28
0+775 4.34 2.195 2.145 7.00 1.31 1.36
0+800 4.40 2.255 2.145 7.00 1.25 1.36
0+825 4.40 2.050 2.350 7.00 1.45 1.15
0+850 4.50 2.070 2.430 7.00 1.43 1.07
0+875 4.35 2.166 2.184 7.00 1.33 1.32
0+900 4.50 2.458 2.042 7.00 1.04 1.46
0+925 4.50 2.211 2.289 7.00 1.29 1.21
0+950 4.40 2.025 2.375 7.00 1.48 1.13
0+975 4.55 2.207 2.344 7.00 1.29 1.16
1+000 4.38 2.068 2.312 7.00 1.43 1.19
1+025 4.40 2.294 2.107 7.00 1.21 1.39
1+050 4.38 2.479 1.901 7.00 1.02 1.60
1+075 4.50 2.430 2.070 7.00 1.07 1.43
1+100 4.50 2.261 2.239 7.00 1.24 1.26
1+125 4.40 2.076 2.324 7.00 1.42 1.18
1+150 4.20 1.791 2.409 7.00 1.71 1.09
1+175 4.50 2.083 2.418 7.00 1.42 1.08
1+200 4.45 2.024 2.426 7.00 1.48 1.07
1+225 4.45 2.029 2.421 7.00 1.47 1.08
1+250 4.50 2.084 2.416 7.00 1.42 1.08
1+275 4.55 2.362 2.188 7.00 1.14 1.31
1+285 5.025 2.442 2.584 8.00 2.06 0.92
Pelebaran Jalan di
1+300 5.50 2.521 2.979 8.00 1.98 0.52
Tikungan 8 m Sisi
1+325 5.45 2.601 2.849 8.00 1.90 0.65
Kanan
1+335 5.225 2.524 2.701 8.00 1.98 0.80
1+350 5.00 2.447 2.553 7.00 1.05 0.95
1+375 5.00 2.638 2.362 7.00 0.86 1.14
1+400 4.25 2.087 2.163 7.00 1.41 1.34
1+425 4.50 2.329 2.172 7.00 1.17 1.33
1+450 4.25 2.070 2.180 7.00 1.43 1.32
1+475 4.55 2.348 2.202 7.00 1.15 1.30
1+500 4.50 2.154 2.347 7.00 1.35 1.15
1+525 4.65 2.159 2.491 7.00 1.34 1.01
1+550 4.50 2.291 2.209 7.00 1.21 1.29
1+575 4.58 2.441 2.139 7.00 1.06 1.36
1+600 4.60 2.372 2.228 7.00 1.13 1.27
1+625 4.60 2.041 2.559 7.00 1.46 0.94
1+650 4.40 2.077 2.323 7.00 1.42 1.18
1+675 4.55 2.362 2.188 7.00 1.14 1.31
1+700 4.65 2.340 2.310 7.00 1.16 1.19
1+725 4.65 2.218 2.432 7.00 1.28 1.07
1+750 4.30 2.030 2.270 7.00 1.47 1.23
1+775 4.60 2.222 2.379 7.00 1.28 1.12
1+800 4.65 2.163 2.487 7.00 1.34 1.01
1+825 4.65 2.387 2.263 7.00 1.11 1.24
1+850 4.45 2.187 2.263 7.00 1.31 1.24
1+875 4.45 2.213 2.237 7.00 1.29 1.26
1+900 4.55 2.266 2.284 7.00 1.23 1.22
1+925 4.55 2.325 2.225 7.00 1.18 1.28
1+950 4.60 2.320 2.280 7.00 1.18 1.22
1+975 4.55 2.226 2.324 7.00 1.27 1.18
2+000 4.65 2.389 2.261 7.00 1.11 1.24
2+025 4.30 2.114 2.186 7.00 1.39 1.31
2+050 4.35 2.122 2.228 7.00 1.38 1.27
2+075 4.60 2.559 2.041 7.00 0.94 1.46
2+100 4.35 2.190 2.160 7.00 1.31 1.34
2+110 4.425 2.171 2.255 8.00 1.33 2.25
2+125 4.50 2.151 2.349 8.00 1.35 2.15 Pelebaran Jalan di
2+150 4.55 2.168 2.382 8.00 1.33 2.12 Tikungan 8 m Sisi Kiri
2+160 4.550 2.289 2.261 8.00 1.21 2.24
2+175 4.55 2.410 2.140 7.00 1.09 1.36
2+200 4.55 2.479 2.071 7.00 1.02 1.43
2+225 4.60 2.400 2.200 7.00 1.10 1.30
2+250 4.45 2.287 2.163 7.00 1.21 1.34
2+275 4.67 2.203 2.467 7.00 1.30 1.03
2+300 4.40 2.034 2.366 8.00 2.47 1.13
Pelebaran Jalan di
2+325 4.45 2.064 2.386 8.00 2.44 1.11
Tikungan 8 m Kanan
2+350 4.50 2.124 2.376 8.00 2.38 1.12
2+375 4.50 2.176 2.324 7.00 1.32 1.18
2+400 4.60 2.294 2.306 7.00 1.21 1.19
2+425 4.60 2.303 2.298 7.00 1.20 1.20
2+450 4.50 2.211 2.289 7.00 1.29 1.21
2+475 4.65 2.333 2.317 7.00 1.17 1.18
2+500 4.50 2.155 2.345 7.00 1.35 1.16
2+525 4.55 2.145 2.405 7.00 1.36 1.10
2+550 4.70 2.235 2.465 7.00 1.27 1.04
2+575 4.80 2.358 2.442 7.00 1.14 1.06
2+580 4.80 2.381 2.419 7.00 1.12 1.08
2+625 - - - 7.00 3.50 3.50
GORONG - GORONG
2+650 - - - 7.00 3.50 3.50
DOUBLE
2+675 - - - 7.00 3.50 3.50
2+720 4.15 2.041 2.109 7.00 1.46 1.39
2+725 4.15 2.041 2.109 7.00 1.46 1.39
2+750 5.40 2.777 2.623 7.00 0.72 0.88
2+775 4.85 2.311 2.539 7.00 1.19 0.96
2+800 4.50 2.116 2.385 7.00 1.38 1.12
2+825 4.50 2.130 2.370 7.00 1.37 1.13
2+850 4.60 2.181 2.419 7.00 1.32 1.08
2+875 4.60 2.315 2.285 7.00 1.19 1.22
2+900 4.25 1.934 2.316 8.00 1.57 2.18
Pelebaran Jalan di
2+925 4.70 2.500 2.200 8.00 1.00 2.30
Tikungan 8 m Sisi Kiri
2+950 4.70 2.449 2.251 8.00 1.05 2.25
2+975 4.55 2.220 2.330 7.00 1.28 1.17
3+000 4.60 2.258 2.342 7.00 1.24 1.16