SERTIFIKAT BULANAN
NOMOR : 07
BULAN JULI 2022
PEKERJAAN PRESERVASI JALAN
TERBILANG : Delapan Ratus Delapan Belas Juta Enam Ratus Tujuh Ribu Delapan Ratus Delapan Puluh Lima Rupiah
DJIBRAEL TUKA ROHI, S.T EDY SUHARTONO, S.T. IBNU RAHMAN, S.T.
NIP. 19710711 200911 1 001 SUPERVISOR ENGINEER MANAJER/ PELAKSANA PROYEK
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT SERTIFIKAT NOMOR : 7 (JUlI)
DIREKTIRAT JENDERAL BINA MARGA
BALAI PELAKSANAAN JALAN NASIONAL NUSA TENGGARA TIMUR
SERTIFIKAT BULANAN TGL/ BULAN/ TAHUN : 23 JULI 2022
PERIODE : JULI
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI NTT BOBOT YANG DICAPAI : 80.41 %
1. PEMELIHARAAN RUTIN KONDISI JALAN
PEJABAT PEMBUAT KOMITMEN (PPK) 3.3 PROVINSI NUSA TENGGARA TIMUR BOBOT TERHADAP KONTRAK : 0.74 %
7.1.(8) Beton f'c 15 Mpa M³ Rp 1,323,175.00 30.00 Rp 39,695,250.00 - Rp - 11.54 Rp 11.54 11.54 Rp 15,263,556.33 0.11
7.9(1) Pasangan Batu M³ Rp 817,646.00 104.00 Rp 85,035,184.00 101.64 Rp 134,481,765.50 2.36 Rp 104.00 104.00 Rp 85,035,184.00 0.62
DIVISI 9 PEKERJAAN HARIAN DAN PEKERJAAN LAIN-LAIN TOTAL HARGA DIVISI 9 PEKERJAAN HARIAN DAN PEKERJAAN LAIN-LAIN : Rp 100,412,223.47
NOMOR ADENDUM II S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN BOBOT
MATA URAIAN KEGIATAN SAT. JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
VOLUME VOLUME VOLUME VOLUME
PEMBAYARAN (Rp) (Rp) (Rp) (Rp) (Rp) (%)
1 2 3 4 5 6=4X5 7 8=4X7 9 10 = 4 X 9 11 12 = 4 X 11 13
9.1.(1) Mandor Jam Rp 19,800.00 196.00 Rp 3,880,800.00 196.00 Rp 3,880,800.00 - Rp - 196.00 Rp 3,880,800.00 0.03
9.1(2) Pekerja Biasa Jam Rp 12,650.00 784.00 Rp 9,917,600.00 784.00 Rp 9,917,600.00 - Rp - 784.00 Rp 9,917,600.00 0.07
9.1.(4)a Dump Truck, Kapasitas 3 - 4 M3 Jam Rp 255,009.00 196.00 Rp 49,981,764.00 196.00 Rp 49,981,764.00 - Rp - 196.00 Rp 49,981,764.00 0.37
9.1.(9) Loader Roda Karet 1,0 - 1,6 M3 Jam Rp 186,898.26 196.00 Rp 36,632,059.47 196.00 Rp 36,632,059.47 - Rp - 196.00 Rp 36,632,059.47 0.27
JUMLAH HARGA DIVISI 9 PEKERJAAN HARIAN DAN PEKERJAAN LAIN-LAIN Rp 100,412,223.47 Rp 100,412,223.47 0.74
BOBOT 100.00
DIVISI 10 PEKERJAAN PEMELIHARAAN KINERJA TOTAL HARGA DIVISI 10 PEKERJAAN PEMELIHARAAN KINERJA : Rp 634,694,782.81
NOMOR ADENDUM II S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN BOBOT
MATA URAIAN KEGIATAN SAT. JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
VOLUME VOLUME VOLUME VOLUME
PEMBAYARAN (Rp) (Rp) (Rp) (Rp) (Rp) (%)
1 2 3 4 5 6=4X5 7 8=4X7 9 10 = 4 X 9 11 12 = 4 X 11 13
10.1.(1) Galian Pada Saluran Air atau lereng untuk Pem M³ Rp 61,210.00 443.69 Rp 27,158,552.75 - Rp - - Rp - - Rp - -
10.1.(3) Perbaikan Pasangan Batu dengan Mortar M³ Rp 826,162.00 117.68 Rp 97,222,744.16 117.68 Rp 97,222,744.16 - Rp - 117.68 Rp 97,222,744.16 0.71
10.1.(4) Perbaikan Lapis Fondasi Agregat Kelas A M³ Rp 549,303.00 34.56 Rp 18,983,911.68 34.56 Rp 18,983,911.68 - Rp - 34.56 Rp 18,983,911.68 0.14
10.1.(9) Perbaiakan Campuran Aspal Panas M³ Rp 3,444,777.00 67.36 Rp 232,040,178.72 67.36 Rp 232,040,178.72 - Rp - 67.36 Rp 232,040,178.72 1.70
10.1.(9) Perbaiakan Campuran Aspal Panas M³ Rp 3,368,707.23 76.97 Rp 259,289,395.50 76.97 Rp 259,289,395.50 - Rp - 76.97 Rp 259,289,395.50 1.90
10.1.(13) Residu Bitumen untuk Pemeliharaan Liter Rp 13,525.00 - Rp - - Rp - - Rp - - Rp - -
10.1.(16) Perbaikan Pasangan Batu M³ Rp 743,140.00 - Rp - - Rp - - Rp - - Rp - -
10.1.(17) Pengecetan Kereb pada Trotoar atau Median M Rp 24,073.82 - Rp - - Rp - - Rp - - Rp - -
10.1.(18) Perbaikan Rel Pengaman M' Rp 343,414.00 - Rp - - Rp - - Rp - - Rp - -
10.1.(19) Pembersihan Patok Buah Rp 10,874.00 - Rp - - Rp - - Rp - - Rp - -
10.1.(20) Pembersihan Rambu Buah Rp 10,874.00 - Rp - - Rp - - Rp - - Rp - -
10.1.(21) Pembersihan Drainase M' Rp 15,116.00 - Rp - - Rp - - Rp - - Rp - -
10.1.(22) Pengendalian Tanaman M² Rp 1,080.00 - Rp - - Rp - - Rp - - Rp - -
DIVISI 4 PEKERJAAN PREVENTIF JALAN TOTAL HARGA DIVISI 4 PEKERJAAN PREVENTIF JALAN : Rp 381,976,000.00
NOMOR ADENDUM I S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN BOBOT
MATA URAIAN KEGIATAN SAT. JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
VOLUME VOLUME VOLUME VOLUME
PEMBAYARAN (Rp) (Rp) (Rp) (Rp) (Rp) (%)
1 2 3 4 5 6=4X5 7 8=4X7 9 10 = 4 X 9 11 12 = 4 X 11 13
4.4.(6) Penghamparan lapis penutup bubur aspal emuls M2 Rp 28,720.00 13,300.00 Rp 381,976,000.00 - Rp - - Rp - - Rp - -
DIVISI 9 PEKERJAAN HARIAN DAN PEKERJAAN LAIN-LAIN TOTAL HARGA DIVISI 9 PEKERJAAN HARIAN DAN PEKERJAAN LAIN-LAIN : Rp 100,177,387.98
NOMOR KONTRAK AWAL S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN BOBOT
MATA URAIAN KEGIATAN SAT. JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
VOLUME VOLUME VOLUME VOLUME
PEMBAYARAN (Rp) (Rp) (Rp) (Rp) (Rp) (%)
1 2 3 4 5 6=4X5 7 8=4X7 9 10 = 4 X 9 11 12 = 4 X 11 13
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 Rp 44,128.00 36.00 Rp 1,588,608.00 - Rp - - Rp - - Rp - -
2.2.(1) Pasangan Batu dengan Mortar M3 Rp 865,453.00 161.68 Rp 139,926,441.04 - Rp - - Rp - - Rp - -
DIVISI 3 PEKERJAAN TANAH DAN GEOSINTETIK TOTAL HARGA DIVISI 3 PEKERJAAN TANAH DAN GEOSINTETIK : Rp 327,948,773.04
NOMOR KONTRAK AWAL S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN BOBOT
MATA URAIAN KEGIATAN SAT. JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
VOLUME VOLUME VOLUME VOLUME
PEMBAYARAN (Rp) (Rp) (Rp) (Rp) (Rp) (%)
1 2 3 4 5 6=4X5 7 8=4X7 9 10 = 4 X 9 11 12 = 4 X 11 13
JUMLAH HARGA DIVISI 3 PEKERJAAN TANAH DAN GEOSINTETIK Rp 327,948,773.04 Rp 28,413,404.02 0.21
BOBOT 8.66
6.1.(1) Lapis Resap Pengikat - Aspal Cair/Emulsi Liter Rp 13,678.00 825.00 Rp 11,284,350.00 - Rp - - Rp - - Rp - -
6.1.(2a) Lapis Perekat - Aspal Cair/Emulsi Liter Rp 13,682.00 191.25 Rp 2,616,682.50 - Rp - - Rp - - Rp - -
6.3.(5a) Laston Lapis Aus (AC-WC) Ton Rp 1,400,558.00 125.55 Rp 175,840,056.90 - Rp - - Rp - - Rp - -
6.3.(6a) Laston Lapis Antara (AC-BC) Ton Rp 1,294,606.00 188.33 Rp 243,813,147.98 - Rp - - Rp - - Rp - -
7.1.(5a) Beton Struktur f'c 30 Mpa M3 Rp 2,405,778.00 291.85 Rp 702,126,309.30 149.75 Rp 360,262,030.50 87.09 Rp 209,508,377.95 236.83 Rp 569,770,408.45 4.18
7.1.(7a) Beton Struktur f'c 20 Mpa M3 Rp 1,812,615.00 35.89 Rp 65,054,752.35 - Rp - - Rp - - Rp - -
7.1.(7a) Beton Struktur f'c 20 Mpa M3 Rp 1,694,437.46 16.46 Rp 27,890,440.55 4.72 Rp 7,997,744.80 - Rp - 4.72 Rp 7,997,744.80 0.06
7.1.(8) Beton f'c 15 Mpa M3 Rp 1,323,175.00 175.12 Rp 231,714,406.00 - Rp - 14.40 Rp 19,053,720.00 14.40 Rp 19,053,720.00 0.14
7.1.(10) Beton f'c 10 Mpa M3 Rp 1,117,383.00 46.21 Rp 51,634,268.43 15.00 Rp 16,760,745.00 - Rp - 15.00 Rp 16,760,745.00 0.12
7.3.(1) Baja Tulangan Polos BJTP 280 Kg Rp 18,478.00 1,719.83 Rp 31,779,018.74 382.00 Rp 7,058,596.00 - Rp - 382.00 Rp 7,058,596.00 0.05
7.3.(4) Baja Tulangan Sirip BJTS 420B Kg Rp 15,746.00 50,492.06 Rp 795,047,976.76 47,065.96 Rp 741,100,632.93 3,426.10 Rp 53,947,343.83 50,492.06 Rp 795,047,976.76 5.83
7.6.(19a) Tiang Bor Beton, Diameter 400 mm M' Rp 605,856.00 2,240.00 Rp 1,357,117,440.00 1,726.21 Rp 1,045,834,685.76 436.79 Rp 264,631,842.24 2,163.00 Rp 1,310,466,528.00 9.61
7.9.(1) Pasangan Batu M3 Rp 817,646.00 583.31 Rp 476,942,716.27 100.38 Rp 82,071,217.25 57.15 Rp 46,724,380.67 157.52 Rp 128,795,597.92 0.94
7.10.(3a) Bronjong dengan Kawat yang dilapisi Galvan M3 Rp 890,570.54 924.00 Rp 822,887,177.32 - Rp - 286.00 Rp 254,703,173.93 286.00 Rp 254,703,173.93 1.87
7.16.(4) Pipa Penyalur PVC M' Rp 80,539.00 872.36 Rp 70,259,002.04 - Rp - 100.00 Rp 8,053,900.00 100.00 Rp 8,053,900.00 0.06
DIVISI 9 PEKERJAAN HARIAN DAN LAIN-LAIN TOTAL HARGA DIVISI 9 PEKERJAAN HARIAN DAN LAIN-LAIN : Rp 579,651,521.80
NOMOR ADENDUM I S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN BOBOT
MATA URAIAN KEGIATAN SAT. JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
VOLUME VOLUME VOLUME VOLUME
PEMBAYARAN (Rp) (Rp) (Rp) (Rp) (Rp) (%)
1 2 3 4 5 6=4X5 7 8=4X7 9 10 = 4 X 9 11 12 = 4 X 11 13
DIVISI 10 PEKERJAAN PEMELIHARAAN KINERJA TOTAL HARGA DIVISI 10 PEKERJAAN PEMELIHARAAN KINERJA : Rp 4,137,731.43
NOMOR ADENDUM I S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN BOBOT
MATA URAIAN KEGIATAN SAT. JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
VOLUME VOLUME VOLUME VOLUME
PEMBAYARAN (Rp) (Rp) (Rp) (Rp) (Rp) (%)
1 2 3 4 5 6=4X5 7 8=4X7 9 10 = 4 X 9 11 12 = 4 X 11 13
1.2 Mobilisasi Ls Rp 136,765,000.00 1.00 Rp 136,765,000.00 0.74 Rp 101,206,100.00 - Rp - 0.74 Rp 101,206,100.00 0.74
1.8.(1) Manajemen dan Keselamatan Lalu Lintas Ls Rp 81,250,000.00 1.00 Rp 81,250,000.00 0.47 Rp 38,137,755.10 - Rp - 0.47 Rp 38,137,755.10 0.28
1.19 Keselamatan dan Kesehatan Kerja Ls Rp 189,600,000.00 1.00 Rp 189,600,000.00 0.47 Rp 88,995,918.37 - Rp - 0.47 Rp 88,995,918.37 0.65
1.21 Manajemen Mutu Ls Rp 86,000,000.00 1.00 Rp 86,000,000.00 0.47 Rp 40,367,346.94 - Rp - 0.47 Rp 40,367,346.94 0.30
DIVISI 3 PEKERJAAN TANAH DAN GEOSINTETIK TOTAL HARGA DIVISI 3 PEKERJAAN TANAH DAN GEOSINTETIK : Rp 109,185,405.36
NOMOR ADENDUM I S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN BOBOT
MATA URAIAN KEGIATAN SAT. JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
VOLUME VOLUME VOLUME VOLUME
PEMBAYARAN (Rp) (Rp) (Rp) (Rp) (Rp) (%)
1 2 3 4 5 6=4X5 7 8=4X7 9 10 = 4 X 9 11 12 = 4 X 11 13
3.1.(1) Galian Biasa M3 Rp 52,569.00 1,550.90 Rp 81,529,248.96 1,550.90 Rp 81,529,248.96 - Rp - 1,550.90 Rp 81,529,248.96 0.60
3.1.(3) Galian Batu M3 Rp 150,142.00 184.20 Rp 27,656,156.40 56.60 Rp 8,498,037.20 - Rp - 56.60 Rp 8,498,037.20 0.06
JUMLAH HARGA DIVISI 3 PEKERJAAN TANAH DAN GEOSINTETIK Rp 109,185,405.36 Rp 90,027,286.16 0.66
BOBOT 82.45
4.4.(6) Penghamparan lapis penutup bubur aspal emuls M2 28,720.00 1,024.20 Rp 29,415,024.00 - Rp - - Rp - - Rp - -
DIVISI 9 PEKERJAAN HARIAN DAN PEKERJAAN LAIN-LAIN TOTAL HARGA DIVISI 9 PEKERJAAN HARIAN DAN PEKERJAAN LAIN-LAIN : Rp 254,098,782.31
NOMOR ADENDUM I S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN BOBOT
MATA URAIAN KEGIATAN SAT. JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
VOLUME VOLUME VOLUME VOLUME
PEMBAYARAN (Rp) (Rp) (Rp) (Rp) (Rp) (%)
1 2 3 4 5 6=4X5 7 8=4X7 9 10 = 4 X 9 11 12 = 4 X 11 13
DIVISI 10 PEKERJAAN PEMELIHARAAN KINERJA TOTAL HARGA DIVISI 10 PEKERJAAN PEMELIHARAAN KINERJA : Rp 88,257,985.55
NOMOR ADENDUM I S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN BOBOT
MATA URAIAN KEGIATAN SAT. JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
VOLUME VOLUME VOLUME VOLUME
PEMBAYARAN (Rp) (Rp) (Rp) (Rp) (Rp) (%)
1 2 3 4 5 6=4X5 7 8=4X7 9 10 = 4 X 9 11 12 = 4 X 11 13
DIVISI 3 PEKERJAAN TANAH DAN GEOSINTETIK TOTAL HARGA DIVISI 3 PEKERJAAN TANAH DAN GEOSINTETIK : Rp 10,775,598.09
NOMOR ADENDUM I S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN BOBOT
MATA URAIAN KEGIATAN SAT. JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
VOLUME VOLUME VOLUME VOLUME
PEMBAYARAN (Rp) (Rp) (Rp) (Rp) (Rp) (%)
1 2 3 4 5 6=4X5 7 8=4X7 9 10 = 4 X 9 11 12 = 4 X 11 13
4.4.(6) Penghamparan lapis penutup bubur aspal emuls M2 Rp 28,720.00 180.00 Rp 5,169,600.00 - Rp - - Rp - - Rp - -
DIVISI 9 PEKERJAAN HARIAN DAN PEKERJAAN LAIN-LAIN TOTAL HARGA DIVISI 9 PEKERJAAN HARIAN DAN PEKERJAAN LAIN-LAIN : Rp 5,347,318.29
NOMOR KONTRAK AWAL S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN BOBOT
MATA URAIAN KEGIATAN SAT. JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
VOLUME VOLUME VOLUME VOLUME
PEMBAYARAN (Rp) (Rp) (Rp) (Rp) (Rp) (%)
1 2 3 4 5 6=4X5 7 8=4X7 9 10 = 4 X 9 11 12 = 4 X 11 13
DIVISI 10 PEKERJAAN PEMELIHARAAN KINERJA TOTAL HARGA DIVISI 10 PEKERJAAN PEMELIHARAAN KINERJA : Rp 28,417,926.39
NOMOR KONTRAK AWAL S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN BOBOT
MATA URAIAN KEGIATAN SAT. JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
VOLUME VOLUME VOLUME VOLUME
PEMBAYARAN (Rp) (Rp) (Rp) (Rp) (Rp) (%)
1 2 3 4 5 6=4X5 7 8=4X7 9 10 = 4 X 9 11 12 = 4 X 11 13
10.1.(4) Perbaikan Lapis Fondasi Agregat Kelas A M3 Rp 549,303.00 7.62 Rp 4,185,688.86 - Rp - 5.38 Rp 2,955,250.14 5.38 Rp 2,955,250.14 0.02
10.1.(9) Perbaiakan Campuran Aspal Panas M3 Rp 3,444,777.00 2.31 Rp 7,957,434.87 - Rp - 1.79 Rp 6,166,150.83 1.79 Rp 6,166,150.83 0.05
10.1.(9) Perbaiakan Campuran Aspal Panas M3 Rp 3,368,707.23 0.23 Rp 774,802.66 - Rp - - Rp - - Rp - -
10.2.(22) Pemeliharaan Kinerja Jembatan BENTENG T ls Rp 9,500,000.00 1.00 Rp 9,500,000.00 - Rp - - Rp - - Rp - -
10.2.(22) Pemeliharaan Kinerja Jembatan TENGKUNDE ls Rp 6,000,000.00 1.00 Rp 6,000,000.00 - Rp - - Rp - - Rp - -
4.62 0.29
9.89 0.62
0.45 0.03
1.15 0.07
5.81 0.37
4.26 0.27
3.16 0.20
11.31 0.71
2.21 0.14
26.99 1.70
30.16 1.90
- -
- -
- -
- -
- -
- -
- -
- -
79.22 2.80
5.69 0.20
15.09 0.53
0.03 0.01
2.22 1.03
2.57 1.19
0.07 0.03
0.04 0.02
0.34 0.16
0.07 0.03
0.59 0.27
0.18 0.08
1.36 0.63
2.75 1.27
0.18 0.08
0.04 0.02
2.79 1.29
3.87 1.79
11.16 5.15
1.03 0.48
0.44 0.20
3.68 1.70
0.82 0.38
0.51 0.23
12.64 5.83
21.57 9.95
7.58 3.50
13.08 6.03
1.12 0.52
0.01 0.01
0.03 0.01
0.14 0.07
0.22 0.10
8.81 4.06
0.01 0.01
0.05 0.02
100.00
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT SERTIFIKAT NOMOR : 7 (JUlI)
DIREKTIRAT JENDERAL BINA MARGA
BALAI PELAKSANAAN JALAN NASIONAL NUSA TENGGARA TIMUR
SERTIFIKAT BULANAN TGL/ BULAN/ TAHUN : 23 JULI 2022
PERIODE : JULI
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI NTT BOBOT YANG DICAPAI : 65.77 %
2. PENUNJANG/ HOLDING JALAN
PEJABAT PEMBUAT KOMITMEN (PPK) 3.3 PROVINSI NUSA TENGGARA TIMUR BOBOT TERHADAP KONTRAK : 3.65 %
1.2 Mobilisasi Ls Rp 185,125,000.00 1.00 Rp 185,125,000.00 0.70 Rp 129,587,500.00 - Rp - 0.70 Rp 129,587,500.00 1.14
1.8.(1) Manajemen dan Keselamatan Lalu Lintas Ls Rp 81,250,000.00 1.00 Rp 81,250,000.00 0.54 Rp 43,875,000.00 0.10 Rp 8,125,000.00 0.64 Rp 52,000,000.00 0.46
1.19 Keselamatan dan Kesehatan Kerja Ls Rp 276,240,000.00 1.00 Rp 276,240,000.00 0.54 Rp 149,169,600.00 0.10 Rp 27,624,000.00 0.64 Rp 176,793,600.00 1.56
1.21 Manajemen Mutu Ls Rp 86,000,000.00 1.00 Rp 86,000,000.00 0.54 Rp 46,440,000.00 0.10 Rp 8,600,000.00 0.64 Rp 55,040,000.00 0.49
ADNAN MOHAMAD ALGADRI, S.T. STEFF H. ABOLLA, S.T. WENSESLAUS LEOBA MEJA, S.T.
NIP. 19640729 200701 1 002 INSPECTION ENGINEER Manajer Teknik
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT SERTIFIKAT NOMOR : 7 (JUlI)
DIREKTIRAT JENDERAL BINA MARGA
BALAI PELAKSANAAN JALAN NASIONAL NUSA TENGGARA TIMUR
SERTIFIKAT BULANAN TGL/ BULAN/ TAHUN : 23 JULI 2022
PERIODE : JULI
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI NTT BOBOT YANG DICAPAI : - %
2. PENUNJANG/ HOLDING JALAN
PEJABAT PEMBUAT KOMITMEN (PPK) 3.3 PROVINSI NUSA TENGGARA TIMUR BOBOT TERHADAP KONTRAK : - %
DIVISI 3 PEKERJAAN TANAH DAN GEOSINTETIK TOTAL HARGA DIVISI 3 PEKERJAAN TANAH DAN GEOSINTETIK : Rp 6,104,114.76
NOMOR ADENDUM II S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN BOBOT
MATA URAIAN KEGIATAN SAT. JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
VOLUME VOLUME VOLUME VOLUME
PEMBAYARAN (Rp) (Rp) (Rp) (Rp) (Rp) (%)
1 2 3 4 5 6=4X5 7 8=4X7 9 10 = 4 X 9 11 12 = 4 X 11 13
ADNAN MOHAMAD ALGADRI, S.T. STEFF H. ABOLLA, S.T. WENSESLAUS LEOBA MEJA, S.T.
NIP. 19640729 200701 1 002 INSPECTION ENGINEER Manajer Teknik
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT SERTIFIKAT NOMOR : 7 (JUlI)
DIREKTIRAT JENDERAL BINA MARGA
BALAI PELAKSANAAN JALAN NASIONAL NUSA TENGGARA TIMUR
SERTIFIKAT BULANAN TGL/ BULAN/ TAHUN : 23 JULI 2022
PERIODE : JULI
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI NTT BOBOT YANG DICAPAI : - %
2. PENUNJANG/ HOLDING JALAN
PEJABAT PEMBUAT KOMITMEN (PPK) 3.3 PROVINSI NUSA TENGGARA TIMUR BOBOT TERHADAP KONTRAK : - %
ADNAN MOHAMAD ALGADRI, S.T. STEFF H. ABOLLA, S.T. WENSESLAUS LEOBA MEJA, S.T.
NIP. 19640729 200701 1 002 INSPECTION ENGINEER Manajer Teknik
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT SERTIFIKAT NOMOR : 7 (JUlI)
DIREKTIRAT JENDERAL BINA MARGA
BALAI PELAKSANAAN JALAN NASIONAL NUSA TENGGARA TIMUR
SERTIFIKAT BULANAN TGL/ BULAN/ TAHUN : 23 JULI 2022
PERIODE : JULI
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI NTT BOBOT YANG DICAPAI : 17.21 %
2. PENUNJANG/ HOLDING JALAN
PEJABAT PEMBUAT KOMITMEN (PPK) 3.3 PROVINSI NUSA TENGGARA TIMUR BOBOT TERHADAP KONTRAK : 1.09 %
7.1.(8) Beton f'c 15 Mpa M³ Rp 1,407,933.00 258.65 Rp 364,155,558.29 87.75 Rp 123,546,120.75 - Rp - 87.75 Rp 123,546,120.75 1.09
7.10(3a) Bronjong dengan Kawat yang dilapisi galvanis M³ Rp 1,001,798.56 353.00 Rp 353,634,891.68 - Rp - - Rp - - Rp - -
ADNAN MOHAMAD ALGADRI, S.T. STEFF H. ABOLLA, S.T. WENSESLAUS LEOBA MEJA, S.T.
NIP. 19640729 200701 1 002 INSPECTION ENGINEER Manajer Teknik
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT SERTIFIKAT NOMOR : 7 (JUlI)
DIREKTIRAT JENDERAL BINA MARGA
BALAI PELAKSANAAN JALAN NASIONAL NUSA TENGGARA TIMUR
SERTIFIKAT BULANAN TGL/ BULAN/ TAHUN : 23 JULI 2022
PERIODE : JULI
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI NTT BOBOT YANG DICAPAI : 28.33 %
2. PENUNJANG/ HOLDING JALAN
PEJABAT PEMBUAT KOMITMEN (PPK) 3.3 PROVINSI NUSA TENGGARA TIMUR BOBOT TERHADAP KONTRAK : 0.69 %
DIVISI 9 PEKERJAAN HARIAN DAN PEKERJAAN LAIN-LAIN TOTAL HARGA DIVISI 9 PEKERJAAN HARIAN DAN PEKERJAAN LAIN-LAIN : Rp 275,639,850.77
NOMOR ADENDUM II S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN BOBOT
MATA URAIAN KEGIATAN SAT. JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
VOLUME VOLUME VOLUME VOLUME
PEMBAYARAN (Rp) (Rp) (Rp) (Rp) (Rp) (%)
1 2 3 4 5 6=4X5 7 8=4X7 9 10 = 4 X 9 11 12 = 4 X 11 13
9.1.(1) Mandor Jam Rp 20,350.00 107.80 Rp 2,193,730.00 98.00 Rp 1,994,300.00 - Rp - 98.00 Rp 1,994,300.00 0.02
9.1.(1) Mandor Jam Rp 18,955.27 169.20 Rp 3,207,232.18 - Rp - - Rp - - Rp - -
9.1(2) Pekerja Biasa Jam Rp 13,750.00 323.40 Rp 4,446,750.00 258.00 Rp 3,547,500.00 36.00 Rp 495,000.00 294.00 Rp 4,042,500.00 0.04
9.1(2) Pekerja Biasa Jam Rp 13,152.15 300.60 Rp 3,953,537.07 - Rp - - Rp - - Rp - -
9.1.(4)a Dump Truck, Kapasitas 3 - 4 M3 Jam Rp 273,116.00 98.00 Rp 26,765,368.00 98.00 Rp 26,765,368.00 - Rp - 98.00 Rp 26,765,368.00 0.24
9.1.(4)a Dump Truck, Kapasitas 3 - 4 M4 Jam Rp 243,959.95 178.00 Rp 43,424,870.52 - Rp - - Rp - - Rp - -
9.1.(9) Loader Roda Karet 1.0 - 1.6 M3 Jam Rp 199,999.00 271.00 Rp 54,199,729.00 98.00 Rp 19,599,902.00 - Rp - 98.00 Rp 19,599,902.00 0.17
9.1.(11) Alat Penggali (Excavator) 80 - 140 PK Jam Rp 570,929.00 98.00 Rp 55,951,042.00 16.00 Rp 9,134,864.00 29.00 Rp 16,556,941.00 45.00 Rp 25,691,805.00 0.23
9.2(1) Marka Jalan Termoplastik M2 Rp 199,749.00 408.00 Rp 81,497,592.00 - Rp - - Rp - - Rp - -
JUMLAH HARGA DIVISI 9 PEKERJAAN HARIAN DAN PEKERJAAN LAIN-LAIN Rp 275,639,850.77 Rp 78,093,875.00 0.69
BOBOT 28.33
ADNAN MOHAMAD ALGADRI, S.T. STEFF H. ABOLLA, S.T. WENSESLAUS LEOBA MEJA, S.T.
NIP. 19640729 200701 1 002 INSPECTION ENGINEER Manajer Teknik
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT SERTIFIKAT NOMOR : 7 (JUlI)
DIREKTIRAT JENDERAL BINA MARGA
BALAI PELAKSANAAN JALAN NASIONAL NUSA TENGGARA TIMUR
SERTIFIKAT BULANAN TGL/ BULAN/ TAHUN : 23 JULI 2022
PERIODE : JULI
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI NTT BOBOT YANG DICAPAI : 86.42 %
2. PENUNJANG/ HOLDING JALAN
PEJABAT PEMBUAT KOMITMEN (PPK) 3.3 PROVINSI NUSA TENGGARA TIMUR BOBOT TERHADAP KONTRAK : 45.69 %
DIVISI 10 PEKERJAAN PEMELIHARAAN KINERJA TOTAL HARGA DIVISI 10 PEKERJAAN PEMELIHARAAN KINERJA : Rp 5,986,534,028.62
NOMOR ADENDUM II S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN BOBOT
MATA URAIAN KEGIATAN SAT. JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
VOLUME VOLUME VOLUME VOLUME
PEMBAYARAN (Rp) (Rp) (Rp) (Rp) (Rp) (%)
1 2 3 4 5 6=4X5 7 8=4X7 9 10 = 4 X 9 11 12 = 4 X 11 13
10.1.(1) Galian Pada Saluran Air atau lereng untuk Pem M³ Rp 65,325.00 1,415.00 Rp 92,434,875.00 434.00 Rp 28,351,050.00 237.30 Rp 15,501,622.50 671.30 Rp 43,852,672.50 0.39
10.1.(3) Perbaikan Pasangan Batu dengan Mortar M³ Rp 858,446.00 215.27 Rp 184,800,591.20 215.27 Rp 184,797,670.42 - Rp - 215.27 Rp 184,797,670.42 1.63
10.1.(3) Perbaikan Pasangan Batu dengan Mortar M³ Rp 757,934.32 84.53 Rp 64,065,609.27 - Rp - - Rp -
10.1.(4) Perbaikan Lapis Fondasi Agregat Kelas A M³ Rp 673,915.00 65.88 Rp 44,397,520.20 60.88 Rp 41,027,945.20 - Rp - 60.88 Rp 41,027,945.20 0.36
10.1.(6) Perbaikan Lapis Fondasi Agregat Kelas S M³ Rp 490,464.00 - Rp - - Rp - - Rp - - Rp - -
10.1.(9) Perbaiakan Campuran Aspal Panas M³ Rp 3,423,275.00 1,178.00 Rp 4,032,617,950.00 985.21 Rp 3,372,644,762.75 189.39 Rp 648,334,052.25 1,174.60 Rp 4,020,978,815.00 35.51
10.1.(11) Perbaikan Asbuton Campuran Aspal Panas M³ Rp 688,500.00 27.42 Rp 18,878,670.00 - Rp - - Rp -
10.1.(13) Residu Bitumen untuk Pemeliharaan Liter Rp 14,435.00 92.43 Rp 1,334,227.05 - Rp - - Rp - - Rp - -
10.1.(16) Perbaikan Pasangan Batu M³ Rp 866,661.00 24.75 Rp 21,449,859.75 24.75 Rp 21,449,859.75 - Rp - 24.75 Rp 21,449,859.75 0.19
10.1.(16) Perbaikan Pasangan Batu M³ Rp 850,372.32 168.41 Rp 143,211,201.65 122.21 Rp 103,924,000.68 - Rp - 122.21 Rp 103,924,000.68 0.92
10.1.(18) Perbaikan Rel Pengaman M' Rp 357,464.00 25.00 Rp 8,936,600.00 - Rp - 25.00 Rp 8,936,600.00 25.00 Rp 8,936,600.00 0.08
10.1.(19) Pembersihan Patok Buah Rp 11,760.00 44.00 Rp 517,440.00 44.00 Rp 517,440.00 - Rp - 44.00 Rp 517,440.00 0.00
10.1.(20) Pembersihan Rambu Buah Rp 11,760.00 12.00 Rp 141,120.00 12.00 Rp 141,120.00 - Rp - 12.00 Rp 141,120.00 0.00
10.1.(21) Pembersihan Drainase M' Rp 16,200.00 26,059.00 Rp 422,155,800.00 26,059.00 Rp 422,155,800.00 - Rp - 26,059.00 Rp 422,155,800.00 3.73
10.1.(22) Pengendalian Tanaman M² Rp 1,119.00 850,395.50 Rp 951,592,564.50 266,399.75 Rp 298,101,320.25 24,570.25 Rp 27,494,109.75 290,970.00 Rp 325,595,430.00 2.88
ADNAN MOHAMAD ALGADRI, S.T. STEFF H. ABOLLA, S.T. WENSESLAUS LEOBA MEJA, S.T.
NIP. 19640729 200701 1 002 INSPECTION ENGINEER Manajer Teknik