STRIP MAP REALISASI & PENANGANAN PAKET POMALAA - WOLULU

0+000 1+034 1+055 2+193 2+630 2+967 3+050 3+760 3+925 4+012 4+160 4+225 4+950 5+540

5+540 5+575 5+925 6+125 6+300 6+500 8+000 8+350 8+630 9+550 10+000

AKTIVITAS TAMBANG Box kondisi baik

10+700 12+125 12+225


10+000 10+200 11+000 11+600 12+550 13+350 14+000

10+675 11+600 Target Galian

15+300 16+100 18+300


14+000 16+400 17+050 19+525 20+100 21+100

14+030 14+800 16+275 16+435 17+700 18+400 20+659


Jbt. Oko-oko VI Jbt. S. Lamedai I 18+600
Penutup Saluran Irigasi

21+000 22+050 24+100 31+900

21+850
22+700

KETERANGAN :

= REALISASI AC-WC = PENANGANAN PENURUNAN BDN JALAN = PAS. BT. MORTAR POSISI 25% - 65%

= REALISASI AC-BC = PENANGANAN TIMBUNAN PILIHAN/RAISING = RENCANA KLAS S

= REALISASI LFA KLAS A = RENCANA BOX 5 UNIT = RENCANA U-DITCH


PENANGANAN PELAKSANAAN PEKERJAAN MARET 2023

KETERANGAN :

= PAS. BATU MORTAR

= SALURAN U-DITCH

= PENUTUP SALURAN IRIGASI


PROGRES BULAN OKTOBER 2023
NAMA PAKET : PRESERVASI JALAN POMALAA - WOLULU 16
RUAS : POMALAA - WOLULU
KONTRAKTOR : PT. LINCE ROMAULI RAYA - PT. AGUNG SARANA PERSADA (KSO) MINGGU KE : 68 sd 71
KONSULTAN : PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI KONSULTAN - PT. ARISTA CIPTA Periode : 03 Oktober - 31 Oktober 2023
NO. KONTRAK : HK 0201-Bb21.1.3/286, Tanggal 17 Mei 2022

PRESTASI
HARGA JUMLAH
No. VOLUME BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT JUMLAH
Item ADD-02 SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
15BULAN INI INI
I DIVISI 1. UMUM
1.2 Mobilisasi Ls 1.00 500,000,000.00 500,000,000.00 0.4189 0.700 - 0.700 0.293 - 0.293 350,000,000.00
1.80 Manajemen dan Keselamatan Lalu Lintas Ls 1.00 100,000,000.00 100,000,000.00 0.0838 0.657 0.050 0.707 0.055 0.004 0.059 70,736,842.11
1.17 Pengamanan Lingkungan Hidup
1.17.(1a) Pengujian pH Buah 9.00 70,000.00 630,000.00 0.0005 6.000 - 6.000 0.000 - 0.000 420,000.00
1.17.(1b) Pengujian Oksigen Terlarut (DO) Buah 9.00 100,000.00 900,000.00 0.0008 6.000 - 6.000 0.001 - 0.001 600,000.00
1.17.(1c) Pengujian Zat Padat Terlarut (TDS) Buah 9.00 150,000.00 1,350,000.00 0.0011 6.000 - 6.000 0.001 - 0.001 900,000.00
1.17.(1d) Pengujian Zat Tersuspensi (TSS) Buah 9.00 100,000.00 900,000.00 0.0008 6.000 - 6.000 0.001 - 0.001 600,000.00
1.17.(1e) Pengujian Biological Oxygen Demand (BOD) Buah 9.00 140,000.00 1,260,000.00 0.0011 6.000 - 6.000 0.001 - 0.001 840,000.00
1.17.(1f) Pengujian Chemical Oxygen Demand (COD) Buah 9.00 140,000.00 1,260,000.00 0.0011 6.000 - 6.000 0.001 - 0.001 840,000.00
1.17.(2c) Pengujian Parameter Kebisingan dan/atau Getara Buah 9.00 140,000.00 1,260,000.00 0.0011 6.000 - 6.000 0.001 - 0.001 840,000.00
1.17.(3b) Pengujian Sulfurdioksida (SO2) Buah 9.00 200,000.00 1,800,000.00 0.0015 6.000 - 6.000 0.001 - 0.001 1,200,000.00
1.17.(3f) Pengujian Total Partikulat (TSP) - Debu Buah 9.00 125,000.00 1,125,000.00 0.0009 6.000 - 6.000 0.001 - 0.001 750,000.00
1.19 Keselamatan dan Kesehatan Kerja
1.00 1. Penyiapan RKK Buah 1.00 3,000,000.00 3,000,000.00 0.0025 1.000 - 1.000 0.003 - 0.003 3,000,000.00
2.00 2. Sosialisasi dan Promosi Dan Pelatihan Buah 1.00 5,000,000.00 5,000,000.00 0.0042 - - - - - -
3.00 3. Alat Pelindung Kerja (APK) dan Alat Pelindung Dir Buah 1.00 35,000,000.00 35,000,000.00 0.0293 0.565 0.033 0.597 0.017 0.001 0.018 20,906,840.77
4.00 4. Asuransi dan Perizinan Buah 1.00 20,000,000.00 20,000,000.00 0.0168 1.000 - 1.000 0.017 - 0.017 20,000,000.00
5.00 5. Personel K3 Konstruksi Buah 1.00 99,000,000.00 99,000,000.00 0.0829 0.547 0.034 0.581 0.045 0.003 0.048 57,534,890.14
6.00 6. Fasilitas sarana kesehatan Buah 1.00 15,000,000.00 15,000,000.00 0.0126 - - - - - - -
7.00 7. Rambu-rambu terdiri atas Buah 1.00 22,727,272.73 22,727,272.73 0.0190 0.576 0.032 0.608 0.011 0.001 0.012 13,808,936.48
8.00 8. Konsultasi dengan Ahli Terkait Keselamatan Konst Buah 1.00 15,000,000.00 15,000,000.00 0.0126 - - - - - - -
9.00 9. Lain-lain terkait pengendalian risiko K3 Buah 1.00 5,000,000.00 5,000,000.00 0.0042 - - - - - - -
1.21 Manajemen Mutu Ls 1.00 200,000,000.00 200,000,000.00 0.1676 0.673 0.050 0.723 0.113 0.008 0.121 144,500,000.00

Sub Total ( 1 ) 1,030,212,272.73 0.8631 0.559 0.017 0.576 687,477,509.50

II DIVISI 2. DRAINASE 18,057.000 2,600.000 20,157.000


2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 11,009.65 25,000.00 275,241,150.00 0.2306 9,786.894 1,138.200 10,925.094 0.205 0.024 0.229 273,127,350.00
2.2.(1) Pasangan Batu dengan Mortar M3 8,363.10 700,000.00 5,854,170,000.00 4.9047 6,764.524 1,188.200 7,952.724 3.967 0.697 4.664 5,566,906,807.00
2.3.(15) Gorong-gorong Kotak Beton Bertulang, ukuran dalam M1 134.40 4,275,906.49 574,681,832.26 0.4815 120.000 14.400 134.400 0.430 0.052 0.481 574,681,832.26
2.3.(18) Gorong-gorong Kotak Beton Bertulang, ukuran dalam M1 354.00 7,268,205.12 2,572,944,612.48 2.1556 354.000 - 354.000 2.156 - 2.156 2,572,944,612.48
2.3.(20) Gorong-gorong Kotak Beton Bertulang, ukuran dalam M1 13.20 42,718,794.10 563,888,082.12 0.4724 13.200 - 13.200 0.472 - 0.472 563,888,082.12
2.3.(22) Saluran berbentuk U Tipe DS 1 (precast) M1 5,575.00 1,250,000.00 6,968,750,000.00 5.8385 5,051.000 524.000 5,575.000 5.290 0.549 5.838 6,968,750,000.00

Sub Total ( 2 ) 16,809,675,676.86 14.0833 12.520 1.321 13.841 16,520,298,683.85


PRESTASI
HARGA JUMLAH
No. VOLUME BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT JUMLAH
Item ADD-02 SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14

III DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK -


3.1.(1a) Galian Biasa M3 94,032.95 16,000.00 1,504,527,200.00 1.2605 61,807.415 481.000 62,288.415 0.829 0.006 0.835 996,614,644.27
3.2.(2a) Timbunan Pilihan dari Sumber Galian M3 15,331.32 100,000.00 1,533,132,000.00 1.2845 16,151.276 540.000 16,691.276 1.353 0.045 1.398 1,669,127,551.28
3.3.(1) Penyiapan Badan Jalan M2 88,172.79 5,000.00 440,863,950.00 0.3694 66,514.346 1,300.000 67,814.346 0.279 0.005 0.284 339,071,729.95
3.4.(2) Pemotongan Pohon Pilihan diameter 15 – 30 cm Buah 147.00 39,983.05 5,877,508.35 0.0049 164.000 164.000 0.005 - 0.005 6,557,220.20
3.4.(3) Pemotongan Pohon Pilihan diameter > 30 – 50 cm Buah 218.00 61,536.34 13,414,922.12 0.0112 218.000 218.000 0.011 - 0.011 13,414,922.12
3.4.(4) Pemotongan Pohon Pilihan diameter > 50 – 75 cm Buah 390.00 112,032.53 43,692,686.70 0.0366 390.000 390.000 0.037 - 0.037 43,692,686.70
3.4.(5) Pemotongan Pohon Pilihan diameter > 75 cm Buah 78.00 233,248.73 18,193,400.94 0.0152 78.000 78.000 0.015 - 0.015 18,193,400.94

Sub Total ( 3 ) 3,559,701,668.11 2.9824 2.529 0.057 2.586 3,086,672,155.46

V DIVISI 5. PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN 219


5.1.(1) Lapis Fondasi Agregat Kelas A M3 24,285.05 600,000.00 14,571,030,816.00 12.2078 23,408.320 764.400 24,172.720 11.767 0.384 12.151 14,503,632,000.00
5.1.(3a) Lapis Fondasi Agregat Kelas S M3 15,031.93 250,000.00 3,757,982,500.00 3.1485 6,003.910 1,312.500 7,316.410 1.258 0.275 1.532 1,829,102,500.00

Sub Total ( 5 ) 18,329,013,316.00 15.3562 13.025 0.659 13.684 16,332,734,500.00

VI DIVISI 6. PERKERASAN ASPAL


6.1 (1)(a) Lapis Resap Pengikat - Aspal Cair Liter 65,866.87 15,000.00 988,003,079.40 0.8278 61,074.407 3,208.000 64,282.407 0.768 0.040 0.808 964,236,109.60
6.1 (2)(a) Lapis Perekat - Aspal Cair Liter 68,220.25 13,000.00 886,863,250.00 0.7430 62,067.550 4,629.396 66,696.946 0.676 0.050 0.726 867,060,296.74
6.3.(8) Bahan anti pengelupasan Kg 3,983.28 75,000.00 298,745,827.03 0.2503 3,675.030 267.945 3,942.975 0.231 0.017 0.248 295,723,127.40
6.5.(1b) Laston Lapis Aus Asbuton Butir (AC-WC Asb Butir) Ton 22,538.67 1,425,000.00 32,117,602,968.75 26.9085 20,511.870 1,513.813 22,025.683 24.489 1.807 26.296 31,386,597,562.50
6.5.(2b) Laston Lapis Antara Asbuton Butir (AC-BC Asb Butir) Ton 12,814.17 1,350,000.00 17,299,127,228.88 14.4934 12,007.910 642.522 12,650.432 13.581 0.727 14.308 17,078,083,605.00

Sub Total ( 6 ) 51,590,342,354.06 43.2229 39.745 2.642 42.386 50,591,700,701.24


PRESTASI
HARGA JUMLAH
No. VOLUME BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT JUMLAH
Item ADD-02 SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14

VII DIVISI 7. STRUKTUR


7.1 (5a) Beton struktur, fc’30 Mpa (Kubus 60 x 60 x 60) M3 438.48 3,557,765.22 1,560,008,893.67 1.3070 - 324.000 324.000 - 0.966 0.966 1,152,715,931.28
7.1 (6a) Beton struktur, fc’25 Mpa (untuk penutup saluran) M3 576.00 1,700,000.00 979,200,000.00 0.8204 - - - - - - -
7.1 (7a) Beton struktur, fc’20 MPa (untuk bahu diperkeras) M3 2,654.17 1,125,000.00 2,985,941,250.00 2.5017 93.750 945.000 1,038.750 0.088 0.891 0.979 1,168,593,750.00
7.1 (7d) Beton struktur, fc’20 Mpa (untuk pengaman pantai) M3 583.60 3,494,109.91 2,039,177,917.56 1.7084 - 184.000 184.000 - 0.539 0.539 642,916,223.44
7.1 (9) Beton Siklop, fc’15 Mpa (untuk pengaman pantai) M3 133.93 893,667.17 119,688,844.08 0.1003 - 40.192 40.192 - 0.030 0.030 35,918,270.90
7.1 (10) Beton, fc’10 Mpa M3 - 1,100,000.00 - - - - - - - - -
7.3 (1) Baja Tulangan Polos-BjTP 280 Kg 82,775.89 19,000.00 1,572,741,910.00 1.3177 - 740.400 740.400 - 0.012 0.012 14,067,600.00
7.3 (3) Baja Tulangan Ulir-BjTS 420 A Kg 27,677.40 20,934.10 579,401,459.34 0.4854 - 9,474.612 9,474.612 - 0.166 0.166 198,342,475.07
7.9.(1) Pasangan Batu M3 14,773.75 650,000.00 9,602,935,415.14 8.0454 12,481.098 1,362.420 13,843.518 6.797 0.742 7.539 8,998,286,700.00
7.10.(3a) Bronjong dengan kawat yang dilapisi Galvanis M3 500.00 725,000.00 362,500,000.00 0.3037 - 500.000 500.000 - 0.304 0.304 362,500,000.00
7.15.(1) Pembongkaran Pasangan Batu M3 869.00 304,690.52 264,776,061.88 0.2218 869.000 - 869.000 0.222 - 0.222 264,776,061.88
7.15.(2) Pembongkaran Beton M3 94.73 316,550.08 29,986,789.08 0.0251 94.730 - 94.730 0.025 - 0.025 29,986,789.08
-
Sub Total ( 7 ) 20,096,358,540.74 16.8369 1.043 7.132 3.649 10.781 12,868,103,801.64

IX DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN


9.1 Pekerjaan Harian
9.1.(2) Pekerja Biasa Jam 84.00 18,750.00 1,575,000.00 0.0013 - - - - - - -
9.1.(4) a Dump Truck, kapasitas 3 - 4 m³ Jam 84.00 200,000.00 16,800,000.00 0.0141 - - - - - - -
9.1.(6) Truk Tangki 3000 - 4500 Liter Jam 84.00 200,000.00 16,800,000.00 0.0141 - - - - - - -
9.1.(8) Motor Grader min 100 PK Jam 126.00 200,000.00 25,200,000.00 0.0211 5.000 - 5.000 0.001 - 0.001 1,000,000.00
9.1.(9) Loader Roda Karet 1.0 - 1.6 M3 Jam 126.00 200,000.00 25,200,000.00 0.0211 - - - - - - -
9.1.(13) Penggilas Roda Besi 6 - 9 Ton Jam 84.00 200,000.00 16,800,000.00 0.0141 5.000 - 5.000 0.001 - 0.001 1,000,000.00
9.2 Pekerjaan Lain-Lain
9.2.(1) Marka Jalan Termoplastik M2 12,284.04 120,000.00 1,474,084,800.00 1.2350 1,211.320 - 1,211.320 0.122 - 0.122 145,358,400.00
9.2.(3a) Rambu Jalan Tunggal dengan Permukaan Pemantul Buah 144.00 450,000.00 64,800,000.00 0.0543 - - - - - - -
9.2.(5) Patok Pengarah, material Poly Ethylene (PE) Plastik Buah 1,490.00 300,000.00 447,000,000.00 0.3745 - - - - - - -
9.2.(6a) Patok Kilometer Buah 32.00 350,000.00 11,200,000.00 0.0094 - - - - - - -
9.2.(7) Rel Pengaman M1 4,072.80 850,000.00 3,461,880,000.00 2.9004 - 1,500.000 1,500.000 - 1.068 1.068 1,275,000,000.00
9.2(10a) Kerb Pracetak Jenis 1 (Peninggi/Mountable) M1 2,000.00 115,000.00 230,000,000.00 0.1927 - 2,000.000 2,000.000 - 0.193 0.193 230,000,000.00
9.2.(12a) Perkerasan Blok Beton pada Trotoar dan Median M2 2,400.00 135,000.00 324,000,000.00 0.2715 - 2,400.000 2,400.000 - 0.271 0.271 324,000,000.00

Sub Total ( 9 ) 6,115,339,800.00 5.1235 0.123 1.532 1.656 1,976,358,400.00


PRESTASI
HARGA JUMLAH
No. VOLUME BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT JUMLAH
Item ADD-02 SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14

X DIVISI10. PEKERJAAN PEMELIHARAAN


10.1 Pemeliharaan Jalan
10.1.(3) Perbaikan Pasangan Batu dengan Mortar M3 280.76 1,270,455.74 356,687,180.87 0.2988 - - - - - - -
10.1.(4) Perbaikan Lapis Fondasi Agregat Kelas A M3 130.61 600,000.00 78,366,000.00 0.0657 131.400 - 131.400 0.066 - 0.066 78,840,000.00
10.1.(10a) Perbaikan Campuran Aspal Panas dengan Asbuton M3 201.26 2,900,000.00 583,654,000.00 0.4890 214.095 - 214.095 0.520 - 0.520 620,874,129.18
10.1.(10b) Perbaikan Campuran Aspal Panas dengan Asbuton M3 29.80 3,200,000.00 95,359,994.13 0.0799 22.000 - 22.000 0.059 - 0.059 70,400,000.00
10.1.(21) Pembersihan Drainase dan Saluran Samping M1 29,383.09 5,500.00 161,606,995.00 0.1354 29,153.700 - 29,153.700 0.134 - 0.134 160,345,350.00
10.1.(22) Pengendalian Tanaman M2 519,937.66 500.00 259,968,830.00 0.2178 476,836.800 - 476,836.800 0.200 - 0.200 238,418,400.00
10.2 Pemeliharaan Jembatan
10.2.(1) Pemeliharaan Jembatan S SOPURA BOX Bentang LS 1.00 5,000,000.00 5,000,000.00 0.0042 0.716 - 0.716 0.003 - 0.003 3,581,428.57
10.2.(2) Pemeliharaan Jembatan S.SOPURA Bentang 20.8 LS 1.00 22,000,000.00 22,000,000.00 0.0184 0.716 - 0.716 0.013 - 0.013 15,758,285.71
10.2.(3) Pemeliharaan Jembatan S.OKO-OKO I Bentang 9.8 LS 1.00 12,500,000.00 12,500,000.00 0.0105 0.716 - 0.716 0.008 - 0.008 8,953,571.43
10.2.(4) Pemeliharaan Jembatan S.Oko-Oko II Bentang 8.9 LS 1.00 10,000,000.00 10,000,000.00 0.0084 0.716 - 0.716 0.006 - 0.006 7,162,857.14
10.2.(5) Pemeliharaan Jembatan S.Oko-Ok0 III Bentang 20.8 LS 1.00 25,000,000.00 25,000,000.00 0.0209 0.716 - 0.716 0.015 - 0.015 17,907,142.86
10.2.(6) Pemeliharaan Jembatan S.Oko-Oko IV Bentang 9.8 LS 1.00 10,000,000.00 10,000,000.00 0.0084 0.716 - 0.716 0.006 - 0.006 7,162,857.14
10.2.(7) Pemeliharaan Jembatan S.Oko-Oko V Bentang 9.7 LS 1.00 12,000,000.00 12,000,000.00 0.0101 0.716 - 0.716 0.007 - 0.007 8,595,428.57
10.2.(8) Pemeliharaan Jembatan S.Oko-Oko VI Bentang 6.8 LS 1.00 9,000,000.00 9,000,000.00 0.0075 0.716 - 0.716 0.005 - 0.005 6,446,571.43
10.2.(9) Pemeliharaan Jembatan S.Lamedai I Bentang 8.9 m LS 1.00 11,500,000.00 11,500,000.00 0.0096 0.716 - 0.716 0.007 - 0.007 8,237,285.71
10.2.(10) Pemeliharaan Jembatan S.Lamedai II Bentang 8.9 m LS 1.00 11,500,000.00 11,500,000.00 0.0096 0.716 - 0.716 0.007 - 0.007 8,237,285.71
10.2.(11) Pemeliharaan Jembatan S.Box Tanggetada Bentang LS 1.00 6,000,000.00 6,000,000.00 0.0050 0.716 - 0.716 0.004 - 0.004 4,297,714.29
10.2.(12) Pemeliharaan Jembatan S.Tangketada Bentang 8.8 LS 1.00 10,000,000.00 10,000,000.00 0.0084 0.716 - 0.716 0.006 - 0.006 7,162,857.14
10.2.(13) Pemeliharaan Jembatan S.Anaiwoi I Bentang 8.9 m LS 1.00 10,000,000.00 10,000,000.00 0.0084 0.716 - 0.716 0.006 - 0.006 7,162,857.14
10.2.(14) Pemeliharaan Jembatan S.Anaiwoi II Bentang 15.8 LS 1.00 12,000,000.00 12,000,000.00 0.0101 0.716 - 0.716 0.007 - 0.007 8,595,428.57
10.2.(15) Pemeliharaan Jembatan S.Oneha I Bentang 10.3 m LS 1.00 10,000,000.00 10,000,000.00 0.0084 0.716 - 0.716 0.006 - 0.006 7,162,857.14
10.2.(16) Pemeliharaan Jembatan S.Oneha II Bentang 9.2 m LS 1.00 10,000,000.00 10,000,000.00 0.0084 0.716 - 0.716 0.006 - 0.006 7,162,857.14
10.2.(17) Pemeliharaan Jembatan S.Oneha III Bentang 8.7 m LS 1.00 10,000,000.00 10,000,000.00 0.0084 0.716 - 0.716 0.006 - 0.006 7,162,857.14
10.2.(18) Pemeliharaan Jembatan S.Oneha IV Bentang 12.8 m LS 1.00 13,000,000.00 13,000,000.00 0.0109 0.716 - 0.716 0.008 - 0.008 9,311,714.29
10.2.(19) Pemeliharaan Jembatan S.Oneha V Bentang 10.9 m LS 1.00 13,000,000.00 13,000,000.00 0.0109 0.716 - 0.716 0.008 - 0.008 9,311,714.29
10.2.(20) Pemeliharaan Jembatan S.Toengge Bentang 31.2 m LS 1.00 30,000,000.00 30,000,000.00 0.0251 0.716 - 0.716 0.018 - 0.018 21,488,571.43
10.2.(21) Pemeliharaan Jembatan S.Polewali Bentang 11 m LS 1.00 10,000,000.00 10,000,000.00 0.0084 0.716 - 0.716 0.006 - 0.006 7,162,857.14
10.2.(22) Pemeliharaan Jembatan S.Wolulu Bentang 30.3 m LS 1.00 30,000,000.00 30,000,000.00 0.0251 0.716 - 0.716 0.018 - 0.018 21,488,571.43
Sub Total ( 10 ) 1,828,143,000.00 1.5316 1.155 - 1.155 1,378,391,450.61
TOTAL 119,358,786,628.49 100.000 PROGRESS REALISASI 76.787 9.877 86.665 103,441,737,202.31
Pajak Pertambahan Nilai (Ppn) 11% 13,129,466,529.13 PROGRESS RENCANA 79.501 6.740 86.241 11,378,591,092.25
TOTAL 132,488,253,157.63 DEVIASI (2.713) 3.137 0.424 114,820,328,294.57
DIBULATKAN 132,488,253,000.00 (3.137) 114,820,328,000.00

Disetujui Diperiksa Disiapkan


Pejabat Pembuat Komitmen Konsultan Supervisi Kontraktor
PPK 1.3 Provinsi Sulawesi Tenggara PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI KONSULTAN - PT. ARISTA CIPTA PT. LINCE ROMAULI RAYA - PT. AGUNG SARANA PERSADA (KSO)

DOLLY HUMADA SIREGAR, ST Ir. MUHAMMAD IDRIS RAZAK RISKY KURNIAWAN, ST


NIP. : 19760106 201410 1 001 Supervision Engineer Manager Proyek
NO. PEKERJAAN UTAMA VOLUME SAT.
1 PEMASANGAN U-DITCH 524.00 M1

2 PEMECAH OMBAK 80.00 M1

3 PEMASANGAN BOX CULVERT 1,0 x 1,0 m 14.40 M1

3 PASANGAN BATU MORTAR 1188.20 M3

4 LFA KLAS A 764.40 M3

5 AC-BC 642.52 TON

6 AC-WC 1513.81 TON

7 PASANGAN BATU 1362.42 M3


PANJANG (M)
524

80

14.4

2600

850

1400

2208

953
RINCIAN NILAI RENCANA REALISASI KEUANGAN MARET 2023
Progress
Bulan Uraian Progress MC Nilai Nilai Bersih Nilai Nilai Bersih
Realisasi
Mei 40.236 53,308,145,748.74 Sudah Terbayar
Dev. -9.267
Pot. UM 15% 7,996,221,862.31
Retensi 5% 399,811,093.12

Juni 53.361 70,696,417,919.00 Sudah Terbayar 76.787 101,734,412,209.15


Dev. -2.241 -2.713
Pot. UM 15% 10,604,462,687.85 #VALUE! 15,260,161,831.37 -
Retensi 5% 3,534,820,895.95 #VALUE! 763,008,091.57 -

#VALUE! -

Juli 86.66 ### 44,123,910,375.57 86.66 114,820,328,294.57 13,085,916,085.42


Dev. 22.25 22.25
Pot. UM 15% 17,223,049,244.18 6,618,586,556.34 17,223,049,244.18 1,962,887,412.81
Retensi 5% 5,741,016,414.73 2,206,195,518.78 5,741,016,414.73 654,295,804.27
Total 35,299,128,300.45 10,468,732,868.33
RENCANA PENYERA
NAMA PAKET : PRESERVASI JALAN POMALAA - WOLULU
RUAS : POMALAA - WOLULU
KONTRAKTOR : PT. LINCE ROMAULI RAYA - PT. AGUNG SARANA PERSADA (KSO)
KONSULTAN : PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI KONSULTAN - PT. A
NO. KONTRAK : HK 0201-Bb21.1.3/286, Tanggal 17 Mei 2022

NO.
URAIAN PEKERJAAN
DIVISI

119,358,786,628.49
DIVISI 1. UMUM
2 DIVISI 2. DRAINASE
3 DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK
DIVISI 5. PERKERASAN BERBUTIR DAN
4
PERKERASAN BETON SEMEN
5 DIVISI 6. PERKERASAN ASPAL
6 DIVISI 7. STRUKTUR
DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-
7
LAIN
8 DIVISI 10. PEKERJAAN PEMELIHARAAN

(A) Jumlah Harga Pekerjaan


(B) Pajak Pertambahan Nilai (PPN) = 11% x (A)
(C) JUMLAH TOTAL HARGA PEKERJAAN = (A) + (B)
(D) JUMLAH TOTAL HARGA PEKERJAAN = ( C ) Dibulatkan
POTONGAN

Retensi 5%
Pengembalian Uang Muka 15%
TOTAL TAGIHAN SETELAH POTONGAN
(E) TOTAL RENCANA TAGIHAN
RENCANA PENYERAPAN DANA

G SARANA PERSADA (KSO)


O PT. WINSOLUSI KONSULTAN - PT. ARISTA CIPTA

SUDAH TERBAYAR
JAN SD SEPTEMBER
UANG MUKA SD DESEMBER 2022
2023
(Rp.) (Rp.) (Rp.)
22.492% 51.891%
525,421,250.51 231,512,385.85
2,646,482,219.19 10,948,318,517.05
837,097,875.79 1,792,257,265.03
6,389,951,460.00 8,553,738,040.00
13,814,783,925.50 33,926,698,914.50
1,753,481,115.22 5,869,467,844.25
2,000,000.00 158,642,400.00
876,427,850.00 455,783,900.00

19,694,199,750.00 26,845,645,696.21 61,936,419,266.69


1,969,419,975.00 2,953,021,026.58 6,813,006,119.34
21,663,619,725.00 29,798,666,722.79 68,749,425,386.02
21,663,619,700.00 29,798,666,700.00 68,749,425,300.00
- 1,489,933,335.00 3,437,471,265.00
- 4,469,800,005.00 10,312,413,795.00
21,663,619,700.00 23,838,933,300.00 54,999,540,200.00
100,502,093,200.00

Dibuat Oleh
Kontraktor Pelaksana
PT. LINCE ROMAULI RAYA
PT. AGUNG SARANA PERSADA (KSO)

ADAM GUNAWAN
Kuasa KSO
RPD
OKTOBER 2023
Ket.

(Rp.)
9.877%
20,240,109.57 0.651
1,576,768,053.46 12.711
68,196,000.00 2.260
786,765,000.00 13.179
3,152,985,926.76 42.640
4,355,158,500.69 10.035
1,829,000,000.00 1.667
- 1.116

11,789,113,590.46 84.260
1,296,802,494.95
13,085,916,085.42
13,085,916,000.00
654,295,800.00
1,962,887,400.00
10,468,732,800.00
10,468,732,800.00

Dibuat Oleh
Kontraktor Pelaksana
NCE ROMAULI RAYA
G SARANA PERSADA (KSO)

ADAM GUNAWAN
Kuasa KSO
PROGRES BULAN FEBRUARI 2023
NAMA PAKET : PRESERVASI JALAN POMALAA - WOLULU 16
RUAS : POMALAA - WOLULU
KONTRAKTOR : PT. LINCE ROMAULI RAYA - PT. AGUNG SARANA PERSADA (KSO) 38
KONSULTAN : PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI KONSULTAN - PT. ARISTA CIPTA 25 Februari - 03 Februari 2023
NO. KONTRAK : HK 0201-Bb21.1.3/286, Tanggal 17 Mei 2022

PRESTASI
HARGA JUMLAH
No. VOLUME BOBOT KUANTITAS
URAIAN SAT
Item ADD-02 SATUAN HARGA ( %) REALISASI BOBOT SISA VOLUME PEKERJAAN
JUMLAH (Rp)
(Rp.) (Rp.) (%) SISA JULI AGUSTUS SEPTEMBER OKTOBER
1 2 3 4 5 6 7 8 9 9 9 10 11 12 13
15S/D BULAN (%) 15S/D BULAN
I DIVISI 1. UMUM
1.2 Mobilisasi Ls 1.00 500,000,000.00 500,000,000.00 0.4189 0.700 0.293 350,000,000.00 0.300 -
1.80 Manajemen dan Keselamatan Lalu Lintas Ls 1.00 100,000,000.00 100,000,000.00 0.0838 0.604 0.051 60,368,421.05 0.396 0.050 0.069 0.071 0.072
1.17 Pengamanan Lingkungan Hidup
1.17.(1a) Pengujian pH Buah 9.00 70,000.00 630,000.00 0.0005 6.000 0.000 420,000.00 3.000 -
1.17.(1b) Pengujian Oksigen Terlarut (DO) Buah 9.00 100,000.00 900,000.00 0.0008 6.000 0.001 600,000.00 3.000 -
1.17.(1c) Pengujian Zat Padat Terlarut (TDS) Buah 9.00 150,000.00 1,350,000.00 0.0011 6.000 0.001 900,000.00 3.000 -
1.17.(1d) Pengujian Zat Tersuspensi (TSS) Buah 9.00 100,000.00 900,000.00 0.0008 6.000 0.001 600,000.00 3.000 -
1.17.(1e) Pengujian Biological Oxygen Demand (BOD) Buah 9.00 140,000.00 1,260,000.00 0.0011 6.000 0.001 840,000.00 3.000 -
1.17.(1f) Pengujian Chemical Oxygen Demand (COD) Buah 9.00 140,000.00 1,260,000.00 0.0011 6.000 0.001 840,000.00 3.000 -
1.17.(2c) Pengujian Parameter Kebisingan dan/atau Getara Buah 9.00 140,000.00 1,260,000.00 0.0011 6.000 0.001 840,000.00 3.000 -
1.17.(3b) Pengujian Sulfurdioksida (SO2) Buah 9.00 200,000.00 1,800,000.00 0.0015 6.000 0.001 1,200,000.00 3.000 -
1.17.(3f) Pengujian Total Partikulat (TSP) - Debu Buah 9.00 125,000.00 1,125,000.00 0.0009 6.000 0.001 750,000.00 3.000 -
1.19 Keselamatan dan Kesehatan Kerja
1.00 1. Penyiapan RKK Buah 1.00 3,000,000.00 3,000,000.00 0.0025 1.000 0.003 3,000,000.00 - - - - -
2.00 2. Sosialisasi dan Promosi Dan Pelatihan Buah 1.00 5,000,000.00 5,000,000.00 0.0042 1.000 0.004 5,000,000.00 - - - - -
3.00 3. Alat Pelindung Kerja (APK) dan Alat Pelindung Dir Buah 1.00 35,000,000.00 35,000,000.00 0.0293 0.529 0.016 18,506,643.17 0.471 0.033 0.088 0.089 0.091
4.00 4. Asuransi dan Perizinan Buah 1.00 20,000,000.00 20,000,000.00 0.0168 1.000 0.017 20,000,000.00 - - - - -
5.00 5. Personel K3 Konstruksi Buah 1.00 99,000,000.00 99,000,000.00 0.0829 0.510 0.042 50,472,991.86 0.490 0.034 0.091 0.093 0.095
6.00 6. Fasilitas sarana kesehatan Buah 1.00 15,000,000.00 15,000,000.00 0.0126 1.000 0.013 15,000,000.00 - - - - -
7.00 7. Rambu-rambu terdiri atas Buah 1.00 22,727,272.73 22,727,272.73 0.0190 0.541 0.010 12,290,059.92 0.459 0.032 0.085 0.087 0.089
8.00 8. Konsultasi dengan Ahli Terkait Keselamatan Konst Buah 1.00 15,000,000.00 15,000,000.00 0.0126 1.000 0.013 15,000,000.00 - - - - -
9.00 9. Lain-lain terkait pengendalian risiko K3 Buah 1.00 5,000,000.00 5,000,000.00 0.0042 1.000 0.004 5,000,000.00 - - - - -
1.21 Manajemen Mutu Ls 1.00 200,000,000.00 200,000,000.00 0.1676 0.618 0.103 123,500,000.00 0.382 0.050 0.066 0.068 0.069

Sub Total ( 1 ) 1,030,212,272.73 0.8631 0.57 685,128,116.01


0.200 0.204 0.208
II DIVISI 2. DRAINASE 15,271.000 0.320 15,271.000
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 21,439.42 25,000.00 535,985,500.00 0.4491 8,276.882 0.173 206,922,050.00 13,162.538 1,138.200 1,346.726 1,885.416 3,205.208
2.2.(1) Pasangan Batu dengan Mortar M3 18,066.14 700,000.00 12,646,298,000.00 10.5952 5,491.322 3.220 3,843,925,407.00 12,574.818 1,188.200 1,275.301 1,785.422 3,035.217
2.3.(15) Gorong-gorong Kotak Beton Bertulang, ukuran dalam M1 79.20 4,275,906.49 338,651,794.01 0.2837 12.000 0.043 51,310,877.88 67.200 14.400 32.000 20.800
2.3.(18) Gorong-gorong Kotak Beton Bertulang, ukuran dalam M1 442.80 7,268,205.12 3,218,361,227.14 2.6964 194.400 1.184 1,412,939,075.33 248.400 - 87.000 60.000 101.400
2.3.(22) Saluran berbentuk U Tipe DS 1 (precast) M1 5,575.00 1,250,000.00 6,968,750,000.00 5.8385 2,874.000 3.010 3,592,500,000.00 2,701.000 524.000 762.000 717.000 698.000

Sub Total ( 2 ) 23,708,046,521.14 19.8628 7.63 9,107,597,410.20


PRESTASI
HARGA JUMLAH
No. VOLUME BOBOT KUANTITAS
URAIAN SAT
Item ADD-02 SATUAN HARGA ( %) REALISASI BOBOT SISA VOLUME PEKERJAAN
JUMLAH (Rp)
(Rp.) (Rp.) (%) SISA JULI AGUSTUS SEPTEMBER OKTOBER
1 2 3 4 5 6 7 8 9 9 9 10 11 12 13

III DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK


3.1.(1a) Galian Biasa M3 94,032.95 16,000.00 1,504,527,200.00 1.2605 50,299.839 0.674 804,797,417.07 43,733.111 481.000 23,356.140 19,895.971
3.2.(2a) Timbunan Pilihan dari Sumber Galian M3 11,486.64 100,000.00 1,148,664,000.00 0.9624 12,854.609 1.077 1,285,460,935.90 (1,367.969) 540.000 2,574.000
3.3.(1) Penyiapan Badan Jalan M2 91,692.79 5,000.00 458,463,950.00 0.3841 68,520.653 0.287 342,603,264.41 23,172.137 1,300.000 11,810.954 10,061.183
3.4.(2) Pemotongan Pohon Pilihan diameter 15 – 30 cm Buah 120.00 39,983.05 4,797,966.00 0.0040 120.000 0.004 4,797,966.00 - -
3.4.(3) Pemotongan Pohon Pilihan diameter > 30 – 50 cm Buah 56.00 61,536.34 3,446,035.04 0.0029 54.000 0.003 3,322,962.36 2.000 -
3.4.(4) Pemotongan Pohon Pilihan diameter > 50 – 75 cm Buah 280.00 112,032.53 31,369,108.40 0.0263 227.000 0.021 25,431,384.31 53.000 -
3.4.(5) Pemotongan Pohon Pilihan diameter > 75 cm Buah 52.00 233,248.73 12,128,933.96 0.0102 52.000 0.010 12,128,933.96 - -

Sub Total ( 3 ) 3,163,397,193.40 2.6503 2.08 2,478,542,864.01


0.112 0.157 0.267

V DIVISI 5. PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN


5.1.(1) Lapis Fondasi Agregat Kelas A M3 27,194.68 600,000.00 16,316,808,000.00 13.6704 19,479.966 9.792 11,687,979,600.00 7,714.714 764.400 4,392.999 2,557.315
5.1.(3a) Lapis Fondasi Agregat Kelas S M3 15,031.93 250,000.00 3,757,982,500.00 3.1485 4,343.750 0.910 1,085,937,500.00 10,688.180 1,312.500 1,050.076 1,470.107 2,499.181

Sub Total ( 5 ) 20,074,790,500.00 16.8189 10.70 12,773,917,100.00

VI DIVISI 6. PERKERASAN ASPAL


6.1 (1)(a) Lapis Resap Pengikat - Aspal Cair Liter 62,716.09 15,000.00 940,741,350.00 0.7882 47,638.769 0.599 714,581,532.95 15,077.321 3,208.000 2,711.103 9,158.218
6.1 (2)(a) Lapis Perekat - Aspal Cair Liter 79,147.80 13,000.00 1,028,921,400.00 0.8620 52,209.048 0.569 678,717,628.55 26,938.752 4,629.396 5,604.564 3,921.804 12,782.987
6.3.(8) Bahan anti pengelupasan Kg 5,931.02 75,000.00 444,826,500.00 0.3727 1,871.734 0.118 140,380,071.55 4,059.286 267.945 307.892 215.448 3,268.000
6.5.(1b) Laston Lapis Aus Asbuton Butir (AC-WC Asb Butir) Ton 23,158.56 1,425,000.00 33,000,949,080.26 27.6485 17,072.359 20.382 24,328,111,304.77 6,086.202 1,513.813 1,832.693 1,282.430 1,457.267
6.5.(2b) Laston Lapis Antara Asbuton Butir (AC-BC Asb Butir) Ton 11,772.92 1,350,000.00 15,893,442,000.00 13.3157 9,543.970 10.795 12,884,359,977.22 2,228.950 642.522 543.000 1,043.427

Sub Total ( 6 ) 51,308,880,330.26 42.9871 32.46 38,746,150,515.03


PRESTASI
HARGA JUMLAH
No. VOLUME BOBOT KUANTITAS
URAIAN SAT
Item ADD-02 SATUAN HARGA ( %) REALISASI BOBOT SISA VOLUME PEKERJAAN
JUMLAH (Rp)
(Rp.) (Rp.) (%) SISA JULI AGUSTUS SEPTEMBER OKTOBER
1 2 3 4 5 6 7 8 9 9 9 10 11 12 13

VII DIVISI 7. STRUKTUR


7.1 (6a) Beton struktur, fc’25 Mpa (untuk penutup saluran) M3 576.00 1,700,000.00 979,200,000.00 0.8204 - - - 576.000 324.000 - 576.000 -
7.1 (7a) Beton struktur, fc’20 MPa (untuk bahu diperkeras) M3 2,654.17 1,125,000.00 2,985,941,250.00 2.5017 - - - 2,654.170 945.000 750.000 750.000 209.170
7.1 (10) Beton, fc’10 Mpa M3 - 1,100,000.00 - - - - - - -
7.3 (1) Baja Tulangan Polos-BjTP 280 Kg 81,405.89 19,000.00 1,546,711,910.00 1.2959 - - - 81,405.890 740.400 81,405.890
7.9.(1) Pasangan Batu M3 9,966.44 650,000.00 6,478,186,000.00 5.4275 8,928.442 4.862 5,803,487,564.06 1,037.998 1,362.420 1,359.000 1,386.180 1,400.042
7.10.(3a) Bronjong dengan kawat yang dilapisi Galvanis M3 500.00 725,000.00 362,500,000.00 0.3037 - - - 500.000 500.000 500.000
7.15.(1) Pembongkaran Pasangan Batu M3 869.00 304,690.52 264,776,061.88 0.2218 656.630 0.168 200,068,936.15 212.370 - 70.790 72.206 69.374
7.15.(2) Pembongkaran Beton M3 94.73 316,550.08 29,986,789.08 0.0251 29.900 0.008 9,464,847.39 64.830 - 21.610 22.042 21.178

Sub Total ( 7 ) 12,647,302,010.96 10.5960 5.04 6,013,021,347.60

IX DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN


9.1 Pekerjaan Harian
9.1.(2) Pekerja Biasa Jam 84.00 18,750.00 1,575,000.00 0.0013 - - - 84.000 -
9.1.(4) a Dump Truck, kapasitas 3 - 4 m³ Jam 84.00 200,000.00 16,800,000.00 0.0141 - - - 84.000 -
9.1.(6) Truk Tangki 3000 - 4500 Liter Jam 84.00 200,000.00 16,800,000.00 0.0141 - - - 84.000 -
9.1.(8) Motor Grader min 100 PK Jam 126.00 200,000.00 25,200,000.00 0.0211 5.000 0.001 1,000,000.00 121.000 -
9.1.(9) Loader Roda Karet 1.0 - 1.6 M3 Jam 126.00 200,000.00 25,200,000.00 0.0211 - - - 126.000 -
9.1.(13) Penggilas Roda Besi 6 - 9 Ton Jam 84.00 200,000.00 16,800,000.00 0.0141 5.000 0.001 1,000,000.00 79.000 -
9.2 Pekerjaan Lain-Lain
9.2.(1) Marka Jalan Termoplastik M2 12,284.04 120,000.00 1,474,084,800.00 1.2350 1,356.920 0.136 162,830,400.00 10,927.120 - 2,731.780 2,786.416
9.2.(3a) Rambu Jalan Tunggal dengan Permukaan Pemantul Buah 144.00 450,000.00 64,800,000.00 0.0543 - - - 144.000 -
9.2.(5) Patok Pengarah, material Poly Ethylene (PE) Plastik Buah 1,490.00 300,000.00 447,000,000.00 0.3745 - - - 1,490.000 -
9.2.(6a) Patok Kilometer Buah 32.00 350,000.00 11,200,000.00 0.0094 - - - 32.000 -
9.2.(7) Rel Pengaman M1 3,112.80 850,000.00 2,645,880,000.00 2.2167 - - - 3,112.800 1,500.000
9.2(10a) Kerb Pracetak Jenis 1 (Peninggi/Mountable) M1 3,300.00 115,000.00 379,500,000.00 0.3179 - - - 3,300.000 2,000.000 369.600 517.440 879.648
9.2.(12a) Perkerasan Blok Beton pada Trotoar dan Median M2 3,505.00 135,000.00 473,175,000.00 0.3964 - - - 3,505.000 2,400.000 392.560 549.584 934.293

Sub Total ( 9 ) 5,598,014,800.00 4.6901 0.14 164,830,400.00


PRESTASI
HARGA JUMLAH
No. VOLUME BOBOT KUANTITAS
URAIAN SAT
Item ADD-02 SATUAN HARGA ( %) REALISASI BOBOT SISA VOLUME PEKERJAAN
JUMLAH (Rp)
(Rp.) (Rp.) (%) SISA JULI AGUSTUS SEPTEMBER OKTOBER
1 2 3 4 5 6 7 8 9 9 9 10 11 12 13

X DIVISI10. PEKERJAAN PEMELIHARAAN


10.1 Pemeliharaan Jalan
10.1.(4) Perbaikan Lapis Fondasi Agregat Kelas A M3 317.67 600,000.00 190,600,440.00 0.1597 70.678 0.036 42,406,666.67 246.990 -
10.1.(10a) Perbaikan Campuran Aspal Panas dengan Asbuton M3 169.00 2,900,000.00 490,100,000.00 0.4106 216.619 0.526 628,195,165.54 (47.619) -
10.1.(10b) Perbaikan Campuran Aspal Panas dengan Asbuton M3 22.00 3,200,000.00 70,400,000.00 0.0590 22.000 0.059 70,400,000.00 - -
10.1.(21) Pembersihan Drainase dan Saluran Samping M1 42,635.29 5,500.00 234,494,095.00 0.1965 28,033.700 0.129 154,185,350.00 14,601.590 - 4,867.197 4,964.541
10.1.(22) Pengendalian Tanaman M2 1,100,096.93 500.00 550,048,465.00 0.4608 476,836.800 0.200 238,418,400.00 623,260.130 - 207,753.377 211,908.444
10.2 Pemeliharaan Jembatan
10.2.(1) Pemeliharaan Jembatan S SOPURA BOX Bentang LS 1.00 5,000,000.00 5,000,000.00 0.0042 0.645 0.003 3,226,428.57 0.355 - 0.118 0.121
10.2.(2) Pemeliharaan Jembatan S.SOPURA Bentang 20.8 LS 1.00 22,000,000.00 22,000,000.00 0.0184 0.645 0.012 14,196,285.71 0.355 - 0.118 0.121
10.2.(3) Pemeliharaan Jembatan S.OKO-OKO I Bentang 9.8 LS 1.00 12,500,000.00 12,500,000.00 0.0105 0.645 0.007 8,066,071.43 0.355 - 0.118 0.121
10.2.(4) Pemeliharaan Jembatan S.Oko-Oko II Bentang 8.9 LS 1.00 10,000,000.00 10,000,000.00 0.0084 0.645 0.005 6,452,857.14 0.355 - 0.118 0.121
10.2.(5) Pemeliharaan Jembatan S.Oko-Ok0 III Bentang 20.8 LS 1.00 25,000,000.00 25,000,000.00 0.0209 0.645 0.014 16,132,142.86 0.355 - 0.118 0.121
10.2.(6) Pemeliharaan Jembatan S.Oko-Oko IV Bentang 9.8 LS 1.00 10,000,000.00 10,000,000.00 0.0084 0.645 0.005 6,452,857.14 0.355 - 0.118 0.121
10.2.(7) Pemeliharaan Jembatan S.Oko-Oko V Bentang 9.7 LS 1.00 12,000,000.00 12,000,000.00 0.0101 0.645 0.006 7,743,428.57 0.355 - 0.118 0.121
10.2.(8) Pemeliharaan Jembatan S.Oko-Oko VI Bentang 6.8 LS 1.00 9,000,000.00 9,000,000.00 0.0075 0.645 0.005 5,807,571.43 0.355 - 0.118 0.121
10.2.(9) Pemeliharaan Jembatan S.Lamedai I Bentang 8.9 m LS 1.00 11,500,000.00 11,500,000.00 0.0096 0.645 0.006 7,420,785.71 0.355 - 0.118 0.121
10.2.(10) Pemeliharaan Jembatan S.Lamedai II Bentang 8.9 m LS 1.00 11,500,000.00 11,500,000.00 0.0096 0.645 0.006 7,420,785.71 0.355 - 0.118 0.121
10.2.(11) Pemeliharaan Jembatan S.Box Tanggetada Bentang LS 1.00 6,000,000.00 6,000,000.00 0.0050 0.645 0.003 3,871,714.29 0.355 - 0.118 0.121
10.2.(12) Pemeliharaan Jembatan S.Tangketada Bentang 8.8 LS 1.00 10,000,000.00 10,000,000.00 0.0084 0.645 0.005 6,452,857.14 0.355 - 0.118 0.121
10.2.(13) Pemeliharaan Jembatan S.Anaiwoi I Bentang 8.9 m LS 1.00 10,000,000.00 10,000,000.00 0.0084 0.645 0.005 6,452,857.14 0.355 - 0.118 0.121
10.2.(14) Pemeliharaan Jembatan S.Anaiwoi II Bentang 15.8 LS 1.00 12,000,000.00 12,000,000.00 0.0101 0.645 0.006 7,743,428.57 0.355 - 0.118 0.121
10.2.(15) Pemeliharaan Jembatan S.Oneha I Bentang 10.3 m LS 1.00 10,000,000.00 10,000,000.00 0.0084 0.645 0.005 6,452,857.14 0.355 - 0.118 0.121
10.2.(16) Pemeliharaan Jembatan S.Oneha II Bentang 9.2 m LS 1.00 10,000,000.00 10,000,000.00 0.0084 0.645 0.005 6,452,857.14 0.355 - 0.118 0.121
10.2.(17) Pemeliharaan Jembatan S.Oneha III Bentang 8.7 m LS 1.00 10,000,000.00 10,000,000.00 0.0084 0.645 0.005 6,452,857.14 0.355 - 0.118 0.121
10.2.(18) Pemeliharaan Jembatan S.Oneha IV Bentang 12.8 m LS 1.00 13,000,000.00 13,000,000.00 0.0109 0.645 0.007 8,388,714.29 0.355 - 0.118 0.121
10.2.(19) Pemeliharaan Jembatan S.Oneha V Bentang 10.9 m LS 1.00 13,000,000.00 13,000,000.00 0.0109 0.645 0.007 8,388,714.29 0.355 - 0.118 0.121
10.2.(20) Pemeliharaan Jembatan S.Toengge Bentang 31.2 m LS 1.00 30,000,000.00 30,000,000.00 0.0251 0.645 0.016 19,358,571.43 0.355 - 0.118 0.121
10.2.(21) Pemeliharaan Jembatan S.Polewali Bentang 11 m LS 1.00 10,000,000.00 10,000,000.00 0.0084 0.645 0.005 6,452,857.14 0.355 - 0.118 0.121
10.2.(22) Pemeliharaan Jembatan S.Wolulu Bentang 30.3 m LS 1.00 30,000,000.00 30,000,000.00 0.0251 0.645 0.016 19,358,571.43 0.355 - 0.118 0.121

Sub Total ( 10 ) 1,828,143,000.00 1.5316 1.11 1,322,351,653.64


TOTAL 119,358,786,628.49 100.000 59.73 71,291,539,406.49
Pajak Pertambahan Nilai (Ppn) 11% 13,129,466,529.13 7,842,069,334.71
TOTAL 132,488,253,157.63 79,133,608,741.21
DIBULATKAN 132,488,253,000.00 79,133,608,000.00

Disetujui Diperiksa
Pejabat Pembuat Komitmen Konsultan Supervisi
PPK 1.3 Provinsi Sulawesi Tenggara PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI KONSULTAN - PT. ARISTA CIPTA

IRVAN ASMARA A. SAMI, ST.,MT Ir. MUHAMMAD IDRIS RAZAK


NIP. : 19750226 200312 1 002 Supervision Engineer
16

38
25 Februari - 03 Februari 2023

JUMLAH
TOTAL BOBOT
NOPEMBER DESEMBER (%) (Rp.)
14 15 16 17 17
15BULAN 15BULAN (%)

0.300 0.300 0.126 150,000,000.00


0.074 0.061 0.396 0.033 39,631,578.95

3.000 3.000 0.000 210,000.00


3.000 3.000 0.000 300,000.00
3.000 3.000 0.000 450,000.00
3.000 3.000 0.000 300,000.00
3.000 3.000 0.000 420,000.00
3.000 3.000 0.000 420,000.00
3.000 3.000 0.000 420,000.00
3.000 3.000 0.001 600,000.00
3.000 3.000 0.000 375,000.00

- - - - -
- - - - -
0.093 0.077 0.471 0.014 16,493,356.83
- - - - -
0.097 0.080 0.490 0.041 48,527,008.14
- - - - -
0.091 0.075 0.459 0.009 10,437,212.81
- - - - -
- - - - -
0.071 0.058 0.382 0.064 76,500,000.00

0.29 345,084,156.72
0.212 0.176
24,285.125 0.509
3,269.312 2,317.677 13,162.538 0.276 329,063,450.00
3,095.921 2,194.757 12,574.818 7.375 8,802,372,593.00
67.200 0.241 287,340,916.13
248.400 1.513 1,805,422,151.81
2,701.000 2.829 3,376,250,000.00

12.23 14,600,449,110.94
JUMLAH
TOTAL BOBOT
NOPEMBER DESEMBER (%) (Rp.)
14 15 16 17 17

43,733.111 0.586 699,729,782.93


3,114.000 0.261 311,400,000.00
23,172.137 0.097 115,860,685.59
- - -
- - -
- - -
- - -

0.94 1,126,990,468.52
0.272 0.193

#REF!
7,714.714 3.878 4,628,828,400.00
2,549.165 1,807.151 10,688.180 2.239 2,672,045,000.00

6.12 7,300,873,400.00

15,077.321 0.189 226,159,817.05


26,938.752 0.293 350,203,771.45
4,059.286 0.255 304,446,428.45
6,086.202 7.266 8,672,837,775.50
2,228.950 2.521 3,009,082,022.78

10.53 12,562,729,815.23
JUMLAH
TOTAL BOBOT
NOPEMBER DESEMBER (%) (Rp.)
14 15 16 17 17

900.000 1.282 1,530,000,000.00


2,654.170 2.502 2,985,941,250.00
- - -
82,146.290 1.308 1,560,779,510.00
1,290.778 6,798.420 3.702 4,418,973,000.00
1,000.000 0.607 725,000,000.00
212.370 0.054 64,707,125.73
64.830 0.017 20,521,941.69

9.47 11,305,922,827.42

84.000 84.000 0.001 1,575,000.00


84.000 84.000 0.014 16,800,000.00
84.000 84.000 0.014 16,800,000.00
121.000 121.000 0.020 24,200,000.00
126.000 126.000 0.021 25,200,000.00
79.000 79.000 0.013 15,800,000.00

2,814.280 2,594.645 10,927.120 1.099 1,311,254,400.00


79.000 65.000 144.000 0.054 64,800,000.00
820.000 670.000 1,490.000 0.375 447,000,000.00
32.000 32.000 0.009 11,200,000.00
1,712.000 1,400.800 4,612.800 3.285 3,920,880,000.00
897.241 636.071 5,300.000 0.511 609,500,000.00
952.979 675.585 5,905.000 0.668 797,175,000.00

6.08 7,262,184,400.00
JUMLAH
TOTAL BOBOT
NOPEMBER DESEMBER (%) (Rp.)
14 15 16 17 17

246.990 246.990 0.124 148,193,773.33


(47.619) (47.619) (0.116) (138,095,165.54)
- - -
4,769.853 14,601.590 0.067 80,308,745.00
203,598.309 623,260.130 0.261 311,630,065.00

0.116 0.355 0.001 1,773,571.43


0.116 0.355 0.007 7,803,714.29
0.116 0.355 0.004 4,433,928.57
0.116 0.355 0.003 3,547,142.86
0.116 0.355 0.007 8,867,857.14
0.116 0.355 0.003 3,547,142.86
0.116 0.355 0.004 4,256,571.43
0.116 0.355 0.003 3,192,428.57
0.116 0.355 0.003 4,079,214.29
0.116 0.355 0.003 4,079,214.29
0.116 0.355 0.002 2,128,285.71
0.116 0.355 0.003 3,547,142.86
0.116 0.355 0.003 3,547,142.86
0.116 0.355 0.004 4,256,571.43
0.116 0.355 0.003 3,547,142.86
0.116 0.355 0.003 3,547,142.86
0.116 0.355 0.003 3,547,142.86
0.116 0.355 0.004 4,611,285.71
0.116 0.355 0.004 4,611,285.71
0.116 0.355 0.009 10,641,428.57
0.116 0.355 0.003 3,547,142.86
0.116 0.355 0.009 10,641,428.57

0.42 505,791,346.36
46.09 55,010,025,525.19
105.817 6,051,102,807.77
61,061,128,332.96
61,061,128,000.00
PROGRES BULAN FEBRUARI 2023
NAMA PAKET : PRESERVASI JALAN POMALAA - WOLULU 16
RUAS : POMALAA - WOLULU
KONTRAKTOR : PT. LINCE ROMAULI RAYA - PT. AGUNG SARANA PERSADA (KSO) MINGGU KE : 38
KONSULTAN : PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI KONSULTAN - PT. ARISTA CIPTA Periode : 25 Februari - 03 Februari 2023
NO. KONTRAK : HK 0201-Bb21.1.3/286, Tanggal 17 Mei 2022

PRESTASI
HARGA JUMLAH
No. VOLUME BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT JUMLAH
Item ADD-02 SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
15S/D BULAN 15BULAN INI INI
I DIVISI 1. UMUM
1.2 Mobilisasi Ls 1.00 500,000,000.00 500,000,000.00 0.4189 0.700 - 0.700 0.293 - 0.293 350,000,000.00
1.80 Manajemen dan Keselamatan Lalu Lintas Ls 1.00 100,000,000.00 100,000,000.00 0.0838 0.574 0.010 0.584 0.048 0.001 0.049 58,368,421.05
1.17 Pengamanan Lingkungan Hidup
1.17.(1a) Pengujian pH Buah 9.00 70,000.00 630,000.00 0.0005 6.000 - 6.000 0.000 - 0.000 420,000.00
1.17.(1b) Pengujian Oksigen Terlarut (DO) Buah 9.00 100,000.00 900,000.00 0.0008 6.000 - 6.000 0.001 - 0.001 600,000.00
1.17.(1c) Pengujian Zat Padat Terlarut (TDS) Buah 9.00 150,000.00 1,350,000.00 0.0011 6.000 - 6.000 0.001 - 0.001 900,000.00
1.17.(1d) Pengujian Zat Tersuspensi (TSS) Buah 9.00 100,000.00 900,000.00 0.0008 6.000 - 6.000 0.001 - 0.001 600,000.00
1.17.(1e) Pengujian Biological Oxygen Demand (BOD) Buah 9.00 140,000.00 1,260,000.00 0.0011 6.000 - 6.000 0.001 - 0.001 840,000.00
1.17.(1f) Pengujian Chemical Oxygen Demand (COD) Buah 9.00 140,000.00 1,260,000.00 0.0011 6.000 - 6.000 0.001 - 0.001 840,000.00
1.17.(2c) Pengujian Parameter Kebisingan dan/atau Getara Buah 9.00 140,000.00 1,260,000.00 0.0011 6.000 - 6.000 0.001 - 0.001 840,000.00
1.17.(3b) Pengujian Sulfurdioksida (SO2) Buah 9.00 200,000.00 1,800,000.00 0.0015 6.000 - 6.000 0.001 - 0.001 1,200,000.00
1.17.(3f) Pengujian Total Partikulat (TSP) - Debu Buah 9.00 125,000.00 1,125,000.00 0.0009 6.000 - 6.000 0.001 - 0.001 750,000.00
1.19 Keselamatan dan Kesehatan Kerja
1.00 1. Penyiapan RKK Buah 1.00 3,000,000.00 3,000,000.00 0.0025 1.000 - 1.000 0.003 - 0.003 3,000,000.00
2.00 2. Sosialisasi dan Promosi Dan Pelatihan Buah 1.00 5,000,000.00 5,000,000.00 0.0042 1.000 1.000 0.004 - 0.004 5,000,000.00
3.00 3. Alat Pelindung Kerja (APK) dan Alat Pelindung Dir Buah 1.00 35,000,000.00 35,000,000.00 0.0293 0.509 0.007 0.516 0.015 0.000 0.015 18,048,494.37
4.00 4. Asuransi dan Perizinan Buah 1.00 20,000,000.00 20,000,000.00 0.0168 1.000 - 1.000 0.017 - 0.017 20,000,000.00
5.00 5. Personel K3 Konstruksi Buah 1.00 99,000,000.00 99,000,000.00 0.0829 0.489 0.007 0.496 0.041 0.001 0.041 49,125,019.42
6.00 6. Fasilitas sarana kesehatan Buah 1.00 15,000,000.00 15,000,000.00 0.0126 1.000 - 1.000 0.013 - 0.013 15,000,000.00
7.00 7. Rambu-rambu terdiri atas Buah 1.00 22,727,272.73 22,727,272.73 0.0190 0.522 0.006 0.528 0.010 0.000 0.010 12,000,137.35
8.00 8. Konsultasi dengan Ahli Terkait Keselamatan Konst Buah 1.00 15,000,000.00 15,000,000.00 0.0126 1.000 - 1.000 0.013 - 0.013 15,000,000.00
9.00 9. Lain-lain terkait pengendalian risiko K3 Buah 1.00 5,000,000.00 5,000,000.00 0.0042 1.000 - 1.000 0.004 - 0.004 5,000,000.00
1.21 Manajemen Mutu Ls 1.00 200,000,000.00 200,000,000.00 0.1676 0.588 0.010 0.598 0.098 0.002 0.100 119,500,000.00

Sub Total ( 1 ) 1,030,212,272.73 0.8631 0.564 0.003 0.567 677,032,072.18

II DIVISI 2. DRAINASE 15,037.000 1,500.000 16,537.000


2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 21,439.42 25,000.00 535,985,500.00 0.4491 8,150.054 813.000 8,963.054 0.171 0.017 0.188 224,076,350.00
2.2.(1) Pasangan Batu dengan Mortar M3 18,066.14 700,000.00 12,646,298,000.00 10.5952 5,384.384 685.500 6,069.884 3.158 0.402 3.560 4,248,918,807.00
2.3.(15) Gorong-gorong Kotak Beton Bertulang, ukuran dalam M1 79.20 4,275,906.49 338,651,794.01 0.2837 12.000 12.000 0.043 - 0.043 51,310,877.88
2.3.(18) Gorong-gorong Kotak Beton Bertulang, ukuran dalam M1 442.80 7,268,205.12 3,218,361,227.14 2.6964 174.000 60.000 234.000 1.060 0.365 1.425 1,700,759,998.08
2.3.(22) Saluran berbentuk U Tipe DS 1 (precast) M1 5,575.00 1,250,000.00 6,968,750,000.00 5.8385 2,358.000 1,104.000 3,462.000 2.469 1.156 3.626 4,327,500,000.00

Sub Total ( 2 ) 23,708,046,521.14 19.8628 6.900 1.941 8.841 10,552,566,032.96


PRESTASI
HARGA JUMLAH
No. VOLUME BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT JUMLAH
Item ADD-02 SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14

III DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK -


3.1.(1a) Galian Biasa M3 94,032.95 16,000.00 1,504,527,200.00 1.2605 49,910.439 19,897.356 69,807.795 0.669 0.267 0.936 1,116,924,720.75
3.2.(2a) Timbunan Pilihan dari Sumber Galian M3 11,486.64 100,000.00 1,148,664,000.00 0.9624 12,181.068 5,200.000 17,381.068 1.021 0.436 1.456 1,738,106,769.23
3.3.(1) Penyiapan Badan Jalan M2 91,692.79 5,000.00 458,463,950.00 0.3841 67,468.220 53,776.639 121,244.860 0.283 0.225 0.508 606,224,297.93
3.4.(2) Pemotongan Pohon Pilihan diameter 15 – 30 cm Buah 120.00 39,983.05 4,797,966.00 0.0040 120.000 120.000 0.004 - 0.004 4,797,966.00
3.4.(3) Pemotongan Pohon Pilihan diameter > 30 – 50 cm Buah 56.00 61,536.34 3,446,035.04 0.0029 54.000 54.000 0.003 - 0.003 3,322,962.36
3.4.(4) Pemotongan Pohon Pilihan diameter > 50 – 75 cm Buah 280.00 112,032.53 31,369,108.40 0.0263 227.000 227.000 0.021 - 0.021 25,431,384.31
3.4.(5) Pemotongan Pohon Pilihan diameter > 75 cm Buah 52.00 233,248.73 12,128,933.96 0.0102 52.000 52.000 0.010 - 0.010 12,128,933.96

Sub Total ( 3 ) 3,163,397,193.40 2.6503 2.010 0.928 2.938 3,506,937,034.54

V DIVISI 5. PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN 521 #REF!


5.1.(1) Lapis Fondasi Agregat Kelas A M3 27,194.68 600,000.00 16,316,808,000.00 13.6704 18,916.566 6,792.451 25,709.017 9.509 3.414 12.924 15,425,410,320.00
5.1.(3a) Lapis Fondasi Agregat Kelas S M3 15,031.93 250,000.00 3,757,982,500.00 3.1485 4,062.500 12,141.422 16,203.922 0.851 2.543 3.394 4,050,980,468.75

Sub Total ( 5 ) 20,074,790,500.00 16.8189 10.360 5.958 16.318 19,476,390,788.75

VI DIVISI 6. PERKERASAN ASPAL


6.1 (1)(a) Lapis Resap Pengikat - Aspal Cair Liter 62,716.09 15,000.00 940,741,350.00 0.7882 47,085.065 18,702.064 65,787.129 0.592 0.235 0.827 986,806,932.19
6.1 (2)(a) Lapis Perekat - Aspal Cair Liter 79,147.80 13,000.00 1,028,921,400.00 0.8620 50,447.305 16,973.986 67,421.291 0.549 0.185 0.734 876,476,789.10
6.3.(8) Bahan anti pengelupasan Kg 5,931.02 75,000.00 444,826,500.00 0.3727 1,774.951 932.483 2,707.434 0.112 0.059 0.170 203,057,555.65
6.5.(1b) Laston Lapis Aus Asbuton Butir (AC-WC Asb Butir) Ton 23,158.56 1,425,000.00 33,000,949,080.26 27.6485 16,496.269 5,550.494 22,046.762 19.695 6.627 26.321 31,416,636,292.27
6.5.(2b) Laston Lapis Antara Asbuton Butir (AC-BC Asb Butir) Ton 11,772.92 1,350,000.00 15,893,442,000.00 13.3157 9,433.070 3,745.790 13,178.860 10.669 4.237 14.906 17,791,460,995.82

Sub Total ( 6 ) 51,308,880,330.26 42.9871 31.616 11.342 42.958 51,274,438,565.02


PRESTASI
HARGA JUMLAH
No. VOLUME BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT JUMLAH
Item ADD-02 SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14

VII DIVISI 7. STRUKTUR


7.1 (6a) Beton struktur, fc’25 Mpa (untuk penutup saluran) M3 576.00 1,700,000.00 979,200,000.00 0.8204 - - - - - - -
7.1 (7a) Beton struktur, fc’20 MPa (untuk bahu diperkeras) M3 2,654.17 1,125,000.00 2,985,941,250.00 2.5017 - - - - - - -
7.1 (10) Beton, fc’10 Mpa M3 - 1,100,000.00 - - - - - - - - -
7.3 (1) Baja Tulangan Polos-BjTP 280 Kg 81,405.89 19,000.00 1,546,711,910.00 1.2959 - - - - - - -
7.9.(1) Pasangan Batu M3 9,966.44 650,000.00 6,478,186,000.00 5.4275 8,445.842 1,269.540 9,715.382 4.599 0.691 5.291 6,314,998,564.06
7.10.(3a) Bronjong dengan kawat yang dilapisi Galvanis M3 500.00 725,000.00 362,500,000.00 0.3037 - - - - - - -
7.15.(1) Pembongkaran Pasangan Batu M3 869.00 304,690.52 264,776,061.88 0.2218 656.630 - 656.630 0.168 - 0.168 200,068,936.15
7.15.(2) Pembongkaran Beton M3 94.73 316,550.08 29,986,789.08 0.0251 29.900 - 29.900 0.008 - 0.008 9,464,847.39

Sub Total ( 7 ) 12,647,302,010.96 10.5960 4.775 0.691 5.466 6,524,532,347.60

IX DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN


9.1 Pekerjaan Harian
9.1.(2) Pekerja Biasa Jam 84.00 18,750.00 1,575,000.00 0.0013 - - - - - - -
9.1.(4) a Dump Truck, kapasitas 3 - 4 m³ Jam 84.00 200,000.00 16,800,000.00 0.0141 - - - - - - -
9.1.(6) Truk Tangki 3000 - 4500 Liter Jam 84.00 200,000.00 16,800,000.00 0.0141 - - - - - - -
9.1.(8) Motor Grader min 100 PK Jam 126.00 200,000.00 25,200,000.00 0.0211 5.000 - 5.000 0.001 - 0.001 1,000,000.00
9.1.(9) Loader Roda Karet 1.0 - 1.6 M3 Jam 126.00 200,000.00 25,200,000.00 0.0211 - - - - - - -
9.1.(13) Penggilas Roda Besi 6 - 9 Ton Jam 84.00 200,000.00 16,800,000.00 0.0141 5.000 - 5.000 0.001 - 0.001 1,000,000.00
9.2 Pekerjaan Lain-Lain
9.2.(1) Marka Jalan Termoplastik M2 12,284.04 120,000.00 1,474,084,800.00 1.2350 1,356.920 - 1,356.920 0.136 - 0.136 162,830,400.00
9.2.(3a) Rambu Jalan Tunggal dengan Permukaan Pemantul Buah 144.00 450,000.00 64,800,000.00 0.0543 - - - - - - -
9.2.(5) Patok Pengarah, material Poly Ethylene (PE) Plastik Buah 1,490.00 300,000.00 447,000,000.00 0.3745 - - - - - - -
9.2.(6a) Patok Kilometer Buah 32.00 350,000.00 11,200,000.00 0.0094 - - - - - - -
9.2.(7) Rel Pengaman M1 3,112.80 850,000.00 2,645,880,000.00 2.2167 - - - - - - -
9.2(10a) Kerb Pracetak Jenis 1 (Peninggi/Mountable) M1 3,300.00 115,000.00 379,500,000.00 0.3179 - - - - - - -
9.2.(12a) Perkerasan Blok Beton pada Trotoar dan Median M2 3,505.00 135,000.00 473,175,000.00 0.3964 - - - - - - -

Sub Total ( 9 ) 5,598,014,800.00 4.6901 0.138 - 0.138 164,830,400.00


PRESTASI
HARGA JUMLAH
No. VOLUME BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT JUMLAH
Item ADD-02 SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14

X DIVISI10. PEKERJAAN PEMELIHARAAN


10.1 Pemeliharaan Jalan
10.1.(4) Perbaikan Lapis Fondasi Agregat Kelas A M3 317.67 600,000.00 190,600,440.00 0.1597 70.678 - 70.678 0.036 - 0.036 42,406,666.67
10.1.(10a) Perbaikan Campuran Aspal Panas dengan Asbuton M3 169.00 2,900,000.00 490,100,000.00 0.4106 216.619 - 216.619 0.526 - 0.526 628,195,165.54
10.1.(10b) Perbaikan Campuran Aspal Panas dengan Asbuton M3 22.00 3,200,000.00 70,400,000.00 0.0590 22.000 - 22.000 0.059 - 0.059 70,400,000.00
10.1.(21) Pembersihan Drainase dan Saluran Samping M1 42,635.29 5,500.00 234,494,095.00 0.1965 28,033.700 - 28,033.700 0.129 - 0.129 154,185,350.00
10.1.(22) Pengendalian Tanaman M2 1,100,096.93 500.00 550,048,465.00 0.4608 476,836.800 - 476,836.800 0.200 - 0.200 238,418,400.00
10.2 Pemeliharaan Jembatan
10.2.(1) Pemeliharaan Jembatan S SOPURA BOX Bentang LS 1.00 5,000,000.00 5,000,000.00 0.0042 0.645 - 0.645 0.003 - 0.003 3,226,428.57
10.2.(2) Pemeliharaan Jembatan S.SOPURA Bentang 20.8 LS 1.00 22,000,000.00 22,000,000.00 0.0184 0.645 - 0.645 0.012 - 0.012 14,196,285.71
10.2.(3) Pemeliharaan Jembatan S.OKO-OKO I Bentang 9.8 LS 1.00 12,500,000.00 12,500,000.00 0.0105 0.645 - 0.645 0.007 - 0.007 8,066,071.43
10.2.(4) Pemeliharaan Jembatan S.Oko-Oko II Bentang 8.9 LS 1.00 10,000,000.00 10,000,000.00 0.0084 0.645 - 0.645 0.005 - 0.005 6,452,857.14
10.2.(5) Pemeliharaan Jembatan S.Oko-Ok0 III Bentang 20.8 LS 1.00 25,000,000.00 25,000,000.00 0.0209 0.645 - 0.645 0.014 - 0.014 16,132,142.86
10.2.(6) Pemeliharaan Jembatan S.Oko-Oko IV Bentang 9.8 LS 1.00 10,000,000.00 10,000,000.00 0.0084 0.645 - 0.645 0.005 - 0.005 6,452,857.14
10.2.(7) Pemeliharaan Jembatan S.Oko-Oko V Bentang 9.7 LS 1.00 12,000,000.00 12,000,000.00 0.0101 0.645 - 0.645 0.006 - 0.006 7,743,428.57
10.2.(8) Pemeliharaan Jembatan S.Oko-Oko VI Bentang 6.8 LS 1.00 9,000,000.00 9,000,000.00 0.0075 0.645 - 0.645 0.005 - 0.005 5,807,571.43
10.2.(9) Pemeliharaan Jembatan S.Lamedai I Bentang 8.9 m LS 1.00 11,500,000.00 11,500,000.00 0.0096 0.645 - 0.645 0.006 - 0.006 7,420,785.71
10.2.(10) Pemeliharaan Jembatan S.Lamedai II Bentang 8.9 m LS 1.00 11,500,000.00 11,500,000.00 0.0096 0.645 - 0.645 0.006 - 0.006 7,420,785.71
10.2.(11) Pemeliharaan Jembatan S.Box Tanggetada Bentang LS 1.00 6,000,000.00 6,000,000.00 0.0050 0.645 - 0.645 0.003 - 0.003 3,871,714.29
10.2.(12) Pemeliharaan Jembatan S.Tangketada Bentang 8.8 LS 1.00 10,000,000.00 10,000,000.00 0.0084 0.645 - 0.645 0.005 - 0.005 6,452,857.14
10.2.(13) Pemeliharaan Jembatan S.Anaiwoi I Bentang 8.9 m LS 1.00 10,000,000.00 10,000,000.00 0.0084 0.645 - 0.645 0.005 - 0.005 6,452,857.14
10.2.(14) Pemeliharaan Jembatan S.Anaiwoi II Bentang 15.8 LS 1.00 12,000,000.00 12,000,000.00 0.0101 0.645 - 0.645 0.006 - 0.006 7,743,428.57
10.2.(15) Pemeliharaan Jembatan S.Oneha I Bentang 10.3 m LS 1.00 10,000,000.00 10,000,000.00 0.0084 0.645 - 0.645 0.005 - 0.005 6,452,857.14
10.2.(16) Pemeliharaan Jembatan S.Oneha II Bentang 9.2 m LS 1.00 10,000,000.00 10,000,000.00 0.0084 0.645 - 0.645 0.005 - 0.005 6,452,857.14
10.2.(17) Pemeliharaan Jembatan S.Oneha III Bentang 8.7 m LS 1.00 10,000,000.00 10,000,000.00 0.0084 0.645 - 0.645 0.005 - 0.005 6,452,857.14
10.2.(18) Pemeliharaan Jembatan S.Oneha IV Bentang 12.8 m LS 1.00 13,000,000.00 13,000,000.00 0.0109 0.645 - 0.645 0.007 - 0.007 8,388,714.29
10.2.(19) Pemeliharaan Jembatan S.Oneha V Bentang 10.9 m LS 1.00 13,000,000.00 13,000,000.00 0.0109 0.645 - 0.645 0.007 - 0.007 8,388,714.29
10.2.(20) Pemeliharaan Jembatan S.Toengge Bentang 31.2 m LS 1.00 30,000,000.00 30,000,000.00 0.0251 0.645 - 0.645 0.016 - 0.016 19,358,571.43
10.2.(21) Pemeliharaan Jembatan S.Polewali Bentang 11 m LS 1.00 10,000,000.00 10,000,000.00 0.0084 0.645 - 0.645 0.005 - 0.005 6,452,857.14
10.2.(22) Pemeliharaan Jembatan S.Wolulu Bentang 30.3 m LS 1.00 30,000,000.00 30,000,000.00 0.0251 0.645 - 0.645 0.016 - 0.016 19,358,571.43

Sub Total ( 10 ) 1,828,143,000.00 1.5316 1.108 - 1.108 1,322,351,653.64


TOTAL 119,358,786,628.49 100.000 PROGRESS REALISASI 57.472 20.862 78.334 93,499,078,894.68
Pajak Pertambahan Nilai (Ppn) 11% 13,129,466,529.13 PROGRESS RENCANA 55.126 9.284 64.411 10,284,898,678.41
TOTAL 132,488,253,157.63 DEVIASI 2.346 11.578 13.924 103,783,977,573.09
DIBULATKAN 132,488,253,000.00 (11.578) 103,783,977,000.00

Disetujui Diperiksa Disiapkan


Pejabat Pembuat Komitmen Konsultan Supervisi Kontraktor
PPK 1.3 Provinsi Sulawesi Tenggara PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI KONSULTAN - PT. ARISTA CIPTA PT. LINCE ROMAULI RAYA - PT. AGUNG SARANA PERSADA (KSO)

IRVAN ASMARA A. SAMI, ST.,MT Ir. MUHAMMAD IDRIS RAZAK RISKY KURNIAWAN, ST
NIP. : 19750226 200312 1 002 Supervision Engineer Manager Proyek