PAKET :
NOMOR KONTRAK :
HK 02.01-Bb.15.7.2/139
TANGGAL KONTRAK
24 JANUARI 2022
SUMBER DANA :
APBN
TAHUN ANGGARAN
2022
NO URAIAN SATUAN COLD BIN HOT BIN FIELD TRIAL SPESIFIKASI KETERANGAN
14 GRADASI
Lolos saringan 3/4" % 100.00 100.00 100.00 100 - 100
Lolos saringan 1/2" % 91.24 92.17 93.54 90 - 100
Lolos saringan 3/8" % 83.34 81.99 81.51 77 - 90
Lolos saringan #4 % 61.52 59.29 59.72 53 - 69
Lolos saringan #8 % 39.61 45.23 45.16 33.0 - 53.0
Lolos saringan #16 % 30.48 31.48 31.11 21.0 - 40.0
Lolos saringan #30 % 21.49 23.62 22.26 14.0 - 30.0
Lolos saringan #50 % 16.40 16.62 15.93 9.0 - 22.0
Lolos saringan #100 % 10.30 9.15 8.79 6 - 15
Lolos saringan #200 % 7.36 6.38 5.75 4 - 9
SUHU PEMADATAN
Laboratorium °C 145.00 145.00 145 ± 1 75 x 2 Tumbukan
Awal (breakdown) °C 140.00 125 - 145 2 Passing
Antara (intermediate) °C 120.00 100 - 125 26 Passing
KEPADATAN
Tebal Kepadatan Spesifikasi Keterangan
(cm) (%) (%)
5.13 98.863 Min 98 2 pass. Roda baja
5.30 98.819 Min. 98 26 pass. Roda karet
5.21 98.84 Min. 98
AGREGAT B.J. Bulk B.J. App PAKET : Preservasi Jalan Buyat-Molobog-Onggunoi ANGKA PENETRASI ASPAL : 60/70
Hot bin I 2.601 2.723 Kalibrasi profing ring : 11.285 Kg/DIV TANGGAL : Juli 2022 B.J. ASPAL : 1.032
Hot bin II 2.587 2.709 LOKASI : (Field Trial) JENIS CAMPURAN : AC-WC
Hot bin III 2.579 2.684 SUMBER MATERIAL : Ex. Nunuk
FF 3.140 3.150
NO KADAR KADAR B.J BULK B.J EFEKTIF B.J BERAT (gram) ISI B.J. RONGGA STABILITAS KELELEHAN HASIL BAGI RONGGA RONGGA
PARTIKEL
PROPORSI CAMPURAN LOLOS 0.075 /
BENDA ASPAL ASPAL DARI TOTAL DARI TOTAL MAKS. DI DALAM KERING BENDA BULK UDARA DI BACA DI PLASTIS MARSHALL DALAM TERISI
KDR ASPAL
(% Berat Agregat Gabungan)
UJI EFEKTIF AGREGAT AGREGAT CAMPURAN UDARA AIR PERMUKAAN UJI CAMPURAN SESUAIKAN EFEKTIF AGREGAT ASPAL
(%) (%) (gr) (gr) (gr) (gr/cc) (%) (Kg) (mm) (Kg/mm) (%) (%)
0 3.0 - 5.0 % Min 800 Kg 2.0 - 4.0 Min. 250 Kg/mm 0.6-1.6 Min. 15 % Min. 65 %
I II III FF A B C D E F G H I J K L M N O P Q R
47.000 41.000 11.000 1.000 6.090 6.0 2.597 2.604 2.383 1,217.9 689.1 1,219.4 530.3 2.297 115 1245.9 3.05
1,194.5 675.9 1,197.9 522.0 2.288 101 1139.8 3.40
1,214.0 688.4 1,217.0 528.6 2.297 112 1213.4 3.50
1,201.9 679.8 1,206.2 526.4 2.283 96 1040.0 3.25
1,201.7 674.1 1,203.0 528.9 2.272 105 1137.5 3.20
1,215.6 687.9 1,219.4 531.5 2.287 101 1094.2 3.97
1,207.5 685.5 1,209.4 523.9 2.305 108 1170.0 4.00
1,211.0 683.9 1,214.4 530.5 2.283 124 1343.4 3.60
1,210.0 681.7 1,214.1 532.4 2.273 106 1148.4 3.92
1,214.3 681.5 1,218.2 536.7 2.263 112 1175.4 3.30
1,203.3 682.4 1,205.0 522.6 2.303 109 1230.1 3.43
1,204.4 680.1 1,209.0 528.9 2.277 115 1245.9 3.97
2.286 4.070 1181.99 3.549 333.03 0.959 17.34 76.53
AGREGAT B.J. Bulk B.J. App PAKET : Preservasi Jalan Buyat-Molobog-Onggunoi ANGKA PENETRASI ASPAL : 60/70
Hot bin I 2.601 2.723 Kalibrasi profing ring : 11.285 Kg/DIV TANGGAL : Juli 2022 B.J. ASPAL : 1.032
Hot bin II 2.587 2.709 LOKASI : (Field Trial) JENIS CAMPURAN : AC-WC
Hot bin III 2.579 2.684 SUMBER MATERIAL : Ex. Nunuk
FF 3.140 3.150
NO KADAR KADAR B.J BULK B.J EFEKTIF B.J BERAT (gram) ISI B.J. RONGGA STABILITAS KELELEHAN HASIL BAGI RONGGA RONGGA
PARTIKEL
PROPORSI CAMPURAN LOLOS 0.075 /
BENDA ASPAL ASPAL DARI TOTAL DARI TOTAL MAKS. DI DALAM KERING BENDA BULK UDARA DI BACA DI PLASTIS MARSHALL DALAM TERISI
KDR ASPAL
(% Berat Agregat Gabungan)
UJI EFEKTIF AGREGAT AGREGAT CAMPURAN UDARA AIR PERMUKAAN UJI CAMPURAN SESUAIKAN EFEKTIF AGREGAT ASPAL
(%) (%) (gr) (gr) (gr) (gr/cc) (%) (Kg) (mm) (Kg/mm) (%) (%)
0 Min. 2.5 % Min 800 Kg 2.0 - 4.0 Min. 250 Kg/mm 0.6-1.6 Min. 15 % Min. 65 %
I II III FF A B C D E F G H I J K L M N O O Q R
47.00 41.00 11.00 1.00 6.090 5.999 2.597 2.604 2.383 1203.5 680.6 1206.1 525.5 2.290 3.881
1197.0 681.5 1200.3 518.8 2.307 3.165
1204.2 681.1 1208 526.9 2.285
2.294 3.709 PRD
47.00 41.00 11.00 1.00 6.090 5.999 2.597 2.604 2.383 1201.0 680.3 1204.9 524.6 2.289 97.0 1050.9
1200.8 679.4 1202.2 522.8 2.297 94.0 1060.8
1188.8 668.9 1190.7 521.8 2.278 99.0 1117.2
2.288 3.966 1076.3
LOLOS (%)
50
No. Contoh
No. URAIAN
I II 3/4" 100
1 Berat Contoh Campuran 1010.50 1009.10 1/2" 93.55 40
2 Berat Penyaring 29.50 29.40 3/8" 81.53
3 Berat Contoh Campuran + Penyaring ( 1 + 2) 1040.00 1038.50 #4 59.78
30
4 Berat mineral + penyaring 978.20 976.90 #8 45.24
5 Berat Aspal (3-4) 61.80 61.60 #16 31.22
6 Kadar Aspal ( 5 / 1 x 100) 6.116 6.104 #30 22.38 20
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI SULAWESI UTARA PENYEDIA JASA
PPK 2.2 BUYAT-MOLOBOG-ONGGUNOI PT. GLOBAL CIPTA PERKASA
Pengawas Lapangan Quality Quality
TANGGAL TEBAL BERAT CONTOH ISI BERAT ISI (gr/cc) KEPADATAN KETERANGAN
TEBAL Tebal Kepadatan
L/R PRODUKSI Rata Rata KERING DI AIR SSD CONTOH Lapangan JSD LAPANGAN Spesifikasi
NO STA Rata Rata Rata Rata
1 2 3 4 (8-7) (6:9) ( 10 : 11 )*100
( cm ) ( cm ) ( cm ) ( cm ) ( cm ) ( gr ) ( gr ) ( gr ) ( cc ) % ( cm ) % %
1 2 3 4 a b c d 5 6 7 8 9 10 11 12 13 15 16
0+000 - 0+147 L
1 0+025 L1 09 Maret 2022 4.6 4.6 4.6 4.5 4.58 773.7 431.1 776.6 345.5 2.240 97.988 97.988 2 pass. Roda baja
L2 4.3 4.3 4.5 4.6 4.43 771.3 430.3 773.7 343.4 2.247 98.294 98.294 24 pass. Roda karet
4.50 2.244 2.286 98.141
3 0+075 L1 5.1 5.5 4.9 5 5.13 857.1 481.6 861.0 379.4 2.260 98.863 98.863 2 pass. Roda baja
L2 5.1 5.9 4.9 5.3 5.30 871.9 488.7 874.7 386.0 2.259 98.819 98.819 26 pass. Roda karet
5.21 2.260 2.286 98.863
5 0+125 L1 4.7 4.7 4.7 4.6 4.68 803.6 451.6 806.5 354.9 2.265 99.081 99.082 2 pass. Roda baja
L2 4.8 4.8 4.6 4.6 4.70 785.9 443.4 790.5 347.1 2.265 99.081 99.082 28 pass. Roda karet
4.69 2.265 2.286 99.081
4.80 98.695 98
Sumber Material :
NO MATERIAL HOT BIN LOKASI
1 Batu Pecah (13 - 19 mm ) Ex. Camp Nunuk
2 Batu Pecah ( 5 - 13 mm ) Ex. Camp Nunuk
3 Abu Batu ( 0 - 5 mm ) Ex. Camp Nunuk
4 Semen Ex. Conch
5 Anti Pengelupasan (Wetfix BE) India
4 Aspal Curah pen. 60/70 Ex. Pertamina
Komposisi Campuran :
URAIAN Hot Bin I Hot Bin II Hot Bin III FF Aspal Anti Pengelupasan Total
Total Agregat 47.00 41.00 11.00 1.00 0.25 100.00
Total Campuran 44.18 38.54 10.34 0.94 6.00 100
1 VMA Min. 15 %
2 VFB Min. 65 %
KADAR ASPAL >< KEPADATAN KADAR ASPAL >< STABILITAS KADAR ASPAL >< FLOW KADAR ASPAL >< MARSHALL QUOTIENT
2.35
2000.00 5.00 500.00
2.34 4.80
2.33 1800.00 4.60
4.40 450.00
2.32
4.20
2.31 1600.00 4.00 400.00
2.30 3.80
1400.00 3.60
2.29 350.00
3.40
2.28 3.20
1200.00 3.00 300.00
2.27
2.80
2.26
2.60
1000.00 250.00
2.25 2.40
2.24 2.20
800.00 2.00 200.00
2.23 1.80
2.22 1.60
600.00 150.00
1.40
2.21
1.20
2.20 400.00 1.00 100.00
4.5 5 5.5 6 6.5 7 7.5 8 4.5 5 5.5 6 6.5 7 7.5 8 4.5 5 5.5 6 6.5 7 7.5 4.5 5 5.5 6 6.5 7 7.5 8
Kadar Aspal % 5 5.5 6.0 6.5 7 Kadar Aspal % 5 5.5 6.0 6.5 7 Kadar Aspal % 5 5.5 6.0 6.5 7 Kadar Aspal % 5 5.5 6.0 6.5 7
Data Bulk gr/cm³ 2.273 2.283 2.299 2.294 2.291 Data Stability Kg 1143.96 1175.90 1218.78 1169.88 1049.96 Data Flow mm 3.03 3.07 3.27 3.63 3.87 Data MQ Kg/mm 377.13 383.44 373.10 321.98 271.54
800.00 800.00 800.00 800.00 800.00 2.00 2.00 2.00 2.00 2.00 250.00 250.00 250.00 250.00 250.00
KADAR ASPAL >< VIM KADAR ASPAL >< VMA KADAR ASPAL >< VFB KADAR ASPAL >< VIM PRD
10.00 21.00 10.00
92.00
9.00 9.00
20.00
87.00
8.00 8.00
6.00 77.00
6.00
18.00
5.00 72.00 5.00
17.00
4.00 67.00 4.00
Kadar Aspal % 5 5.5 6 6.5 7 Kadar Aspal % 5 5.5 6.0 6.5 7 Kadar Aspal % 5 5.5 6.0 6.5 7 Kadar Aspal % 5 5.5 6.0 6.5 7
Data VIM % 6.005 4.924 3.586 3.125 2.582 Data VMA % 16.84 16.91 16.79 17.42 17.97 Data VFB % 64.33 70.88 78.65 82.06 85.63 Data VIM % 6.005 4.924 3.586 3.125 2.582
3 3 3 3 3 15 15 15 15 15 65 65 65 65 65 VIM PRD % 3.966 2.999 2.280
5 5 5 5 5 2 2 2 2 2
Mengetahui, Diperiksa, Dibuat,
PPK 2.2 Buyat-Molobog-Onggunoi Konsultan Pengawas Penyedia Jasa
Koordinator Lapangan PT. Seecons, KSO CV. Bhakti Megah Mulia
AGREGAT B.J. Bulk B.J. App PAKET : Preservasi Jalan Buyat-Molobog-Onggunoi ANGKA PENETRASI ASPAL : 60/70
Hot bin I 2.601 2.723 Kalibrasi profing ring : 11.285 Kg/DIV TANGGAL : Juni 2022 B.J. ASPAL : 1.032
Hot bin II 2.587 2.709 LOKASI : Lab. Tungoi JENIS CAMPURAN : AC-WC
Hot bin III 2.572 2.684 SUMBER MATERIAL : Ex. Nunuk
FF 3.140 3.150
NO KADAR KADAR B.J BULK B.J EFEKTIF B.J BERAT (gram) ISI B.J. RONGGA STABILITAS KELELEHAN HASIL BAGI RONGGA RONGGA
PARTIKEL
PROPORSI CAMPURAN LOLOS 0.075 /
BENDA ASPAL ASPAL DARI TOTAL DARI TOTAL MAKS. DI DALAM KERING BENDA BULK UDARA DI BACA DI PLASTIS MARSHALL DALAM TERISI
KDR ASPAL
(% Berat Agregat Gabungan)
UJI EFEKTIF AGREGAT AGREGAT CAMPURAN UDARA AIR PERMUKAAN UJI CAMPURAN SESUAIKAN EFEKTIF AGREGAT ASPAL
(%) (%) (gr) (gr) (gr) (gr/cc) (%) (Kg) (mm) (Kg/mm) (%) (%)
0 3.0 - 5.0 % Min 800 Kg 2.0 - 4.0 Min. 250 Kg/mm 0.6-1.6 Min. 15 % Min. 65 %
I II III FF A B C D E F G H I J K L M N O P Q R
47.000 41.000 11.000 1.000 5.0 4.9 2.596 2.602 2.418 1,186.7 693.9 1,189.6 495.7 2.394 94.0 1156.3 3.00
1,193.5 704.3 1,195.4 491.1 2.430 95.0 1168.6 3.20
1,188.3 700.2 1,190.2 490.0 2.425 90.0 1107.1 2.90
AGREGAT B.J. Bulk B.J. App PAKET : Preservasi Jalan Buyat-Molobog-Onggunoi ANGKA PENETRASI ASPAL : 60/70
Hot bin I 2.601 2.723 Kalibrasi profing ring : 11.285 Kg/DIV TANGGAL : Juni 2022 B.J. ASPAL : 1.032
Hot bin II 2.587 2.709 LOKASI : Lab. Tungoi JENIS CAMPURAN : AC-WC
Hot bin III 2.572 2.684 SUMBER MATERIAL : Ex. Nunuk
FF 3.140 3.150
NO KADAR KADAR B.J BULK B.J EFEKTIF B.J BERAT (gram) ISI B.J. RONGGA STABILITAS KELELEHAN HASIL BAGI RONGGA RONGGA
PARTIKEL
PROPORSI CAMPURAN LOLOS 0.075 /
BENDA ASPAL ASPAL DARI TOTAL DARI TOTAL MAKS. DI DALAM KERING BENDA BULK UDARA DI BACA DI PLASTIS MARSHALL DALAM TERISI
KDR ASPAL
(% Berat Agregat Gabungan)
UJI EFEKTIF AGREGAT AGREGAT CAMPURAN UDARA AIR PERMUKAAN UJI CAMPURAN SESUAIKAN EFEKTIF AGREGAT ASPAL
(%) (%) (gr) (gr) (gr) (gr/cc) (%) (Kg) (mm) (Kg/mm) (%) (%)
0 3.0 - 5.0 % Min 800 Kg 2.0 - 4.0 Min. 250 Kg/mm 0.6-1.6 Min. 15 % Min. 65 %
I II III FF A B C D E F G H I J K L M N O P Q R
47.00 41.00 11.00 1.00 5.5 5.4 2.596 2.602 2.401 1,192.4 673.5 1,195.8 522.3 2.283 99.0 1117.2 2.80
1,195.6 674.1 1,198.6 524.5 2.280 110.0 1191.7 3.20
1,194.2 675.3 1,197.9 522.6 2.285 108.0 1218.8 3.20
2.283 4.924 1175.9 3.07 383.445 1.178 16.91 70.880
AGREGAT B.J. Bulk B.J. App PAKET : Preservasi Jalan Buyat-Molobog-Onggunoi ANGKA PENETRASI ASPAL : 60/70
Hot bin I 2.601 2.723 Kalibrasi profing ring : 11.285 Kg/DIV TANGGAL : Juni 2022 B.J. ASPAL : 1.032
Hot bin II 2.587 2.709 LOKASI : Lab. Tungoi JENIS CAMPURAN : AC-WC
Hot bin III 2.579 2.684 SUMBER MATERIAL : Ex. Nunuk
FF 3.140 3.150
NO KADAR KADAR B.J BULK B.J EFEKTIF B.J BERAT (gram) ISI B.J. RONGGA STABILITAS KELELEHAN HASIL BAGI RONGGA RONGGA
PARTIKEL
PROPORSI CAMPURAN LOLOS 0.075 /
BENDA ASPAL ASPAL DARI TOTAL DARI TOTAL MAKS. DI DALAM KERING BENDA BULK UDARA DI BACA DI PLASTIS MARSHALL DALAM TERISI
KDR ASPAL
(% Berat Agregat Gabungan)
UJI EFEKTIF AGREGAT AGREGAT CAMPURAN UDARA AIR PERMUKAAN UJI CAMPURAN SESUAIKAN EFEKTIF AGREGAT ASPAL
(%) (%) (gr) (gr) (gr) (gr/cc) (%) (Kg) (mm) (Kg/mm) (%) (%)
0 3.0 - 5.0 % Min 800 Kg 2.0 - 4.0 Min. 250 Kg/mm 0.6-1.6 Min. 15 % Min. 65 %
I II III FF A B C D E F G H I J K L M N O P Q R
47.00 41.00 11.00 1.00 6.0 5.9 2.597 2.602 2.385 1,195.4 676.2 1,196.5 520.3 2.298 112.0 1263.9 3.40
1,197.7 666.3 1,188.4 522.1 2.294 107.0 1207.5 3.10
1,194.8 677.3 1,195.9 518.6 2.304 105.0 1184.9 3.30
2.299 3.586 1218.8 3.27 373.096 1.076 16.795 78.648
AGREGAT B.J. Bulk B.J. App PAKET : Preservasi Jalan Buyat-Molobog-Onggunoi ANGKA PENETRASI ASPAL : 60/70
Hot bin I 2.601 2.723 Kalibrasi profing ring : 11.285 Kg/DIV TANGGAL : Juni 2022 B.J. ASPAL : 1.032
Hot bin II 2.587 2.709 LOKASI : Lab. Tungoi JENIS CAMPURAN : AC-WC
Hot bin III 2.579 2.684 SUMBER MATERIAL : Ex. Nunuk
FF 3.140 3.150
NO KADAR KADAR B.J BULK B.J EFEKTIF B.J BERAT (gram) ISI B.J. RONGGA STABILITAS KELELEHAN HASIL BAGI RONGGA RONGGA
PARTIKEL
PROPORSI CAMPURAN LOLOS 0.075 /
BENDA ASPAL ASPAL DARI TOTAL DARI TOTAL MAKS. DI DALAM KERING BENDA BULK UDARA DI BACA DI PLASTIS MARSHALL DALAM TERISI
KDR ASPAL
(% Berat Agregat Gabungan)
UJI EFEKTIF AGREGAT AGREGAT CAMPURAN UDARA AIR PERMUKAAN UJI CAMPURAN SESUAIKAN EFEKTIF AGREGAT ASPAL
(%) (%) (gr) (gr) (gr) (gr/cc) (%) (Kg) (mm) (Kg/mm) (%) (%)
0 3.0 - 5.0 % Min 800 Kg 2.0 - 4.0 Min. 250 Kg/mm 0.6-1.6 Min. 15 % Min. 65 %
I II III FF A B C D E F G H I J K L M N O P Q R
47.000 41.000 11.000 1.000 6.5 6.4 2.597 2.602 2.368 1,189.7 671.8 1,191.0 519.2 2.291 101.0 1139.8 3.60
1,191.1 676.9 1,194.6 517.7 2.301 108.0 1218.8 3.80
1,196.5 677.7 1,200.5 522.8 2.289 2.294 102.0 1151.1 3.50
2.294 3.125 1169.9 3.63 321.985 0.992 17.417 82.058
AGREGAT B.J. Bulk B.J. App PAKET : Preservasi Jalan Buyat-Molobog-Onggunoi ANGKA PENETRASI ASPAL : 60/70
Hot bin I 2.601 2.723 Kalibrasi profing ring : 11.285 Kg/DIV TANGGAL : Juni 2022 B.J. ASPAL : 1.032
Hot bin II 2.587 2.709 LOKASI : Lab. Tungoi JENIS CAMPURAN : AC-WC
Hot bin III 2.579 2.684 SUMBER MATERIAL : Ex. Nunuk
FF 3.140 3.150
NO KADAR KADAR B.J BULK B.J EFEKTIF B.J BERAT (gram) ISI B.J. RONGGA STABILITAS KELELEHAN HASIL BAGI RONGGA RONGGA
PARTIKEL
PROPORSI CAMPURAN LOLOS 0.075 /
BENDA ASPAL ASPAL DARI TOTAL DARI TOTAL MAKS. DI DALAM KERING BENDA BULK UDARA DI BACA DI PLASTIS MARSHALL DALAM TERISI
KDR ASPAL
(% Berat Agregat Gabungan)
UJI EFEKTIF AGREGAT AGREGAT CAMPURAN UDARA AIR PERMUKAAN UJI CAMPURAN SESUAIKAN EFEKTIF AGREGAT ASPAL
(%) (%) (gr) (gr) (gr) (gr/cc) (%) (Kg) (mm) (Kg/mm) (%) (%)
0 3.0 - 5.0 % Min 800 Kg 2.0 - 4.0 Min. 250 Kg/mm 0.6-1.6 Min. 15 % Min. 65 %
I II III FF A B C D E F G H I J K L M N O P Q R
47.00 41.00 11.00 1.00 7.0 6.9 2.597 2.602 2.352 1,196.2 677.8 1,199.3 521.5 2.294 90.0 1015.7 3.80
1,197.5 677.4 1,200.5 523.1 2.289 95.0 1029.2 4.10
1,197.8 677.4 1,200.7 523.3 2.289 2.29 102.0 1105.0 3.70
ANALISA SARINGAN
1" 25 0.00 0.00 0.00 100.00 0.00 0.00 0.00 100.00 100.00
3/4" 19 0.00 0.00 0.00 100.00 0.00 0.00 0.00 100.00 100.00
1/2" 12.5 0.00 0.00 0.00 100.00 0.00 0.00 0.00 100.00 100.00
3/8" 9.5 0.00 0.00 0.00 100.00 0.00 0.00 0.00 100.00 100.00
#4 4.75 15.60 15.60 1.46 98.54 17.80 17.80 1.56 98.44 98.49
#8 2.36 199.90 215.50 20.20 79.80 189.80 207.60 18.22 81.78 80.79
#16 1.18 224.10 424.00 39.74 60.26 249.00 438.80 38.50 61.50 60.88
#30 0.6 394.80 618.90 58.01 41.99 423.30 672.30 58.99 41.01 41.50
#50 0.3 328.90 723.70 67.83 32.17 375.10 798.40 70.05 29.95 31.06
#100 0.15 513.00 841.90 78.91 21.09 569.50 944.60 82.88 17.12 19.10
#200 0.075 392.00 905.00 84.83 15.17 448.80 1018.30 89.35 10.65 12.91
1" 25 0.00 0.00 0.00 100.00 0.00 0.00 0.00 100.00 100.00
3/4" 19 0.00 0.00 0.00 100.00 0.00 0.00 0.00 100.00 100.00
1/2" 12.5 0.00 0.00 0.00 100.00 0.00 0.00 0.00 100.00 100.00
3/8" 9.5 189.80 189.80 9.01 90.99 183.20 183.20 8.74 91.26 91.13
#4 4.75 914.70 1,104.50 52.44 47.56 947.70 1130.90 53.94 46.06 46.81
#8 2.36 714.10 1,818.60 86.34 13.66 673.30 1804.20 86.05 13.95 13.80
#16 1.18 94.00 1,912.60 90.80 9.20 78.20 1882.40 89.78 10.22 9.71
#30 0.6 50.70 1,963.30 93.21 6.79 67.70 1950.10 93.01 6.99 6.89
#50 0.3 22.10 1,985.40 94.26 5.74 18.90 1969.00 93.91 6.09 5.92
#100 0.15 28.50 2,013.90 95.61 4.39 20.60 1989.60 94.89 5.11 4.75
#200 0.075 25.00 2,038.90 96.80 3.20 26.00 2015.60 96.13 3.87 3.53
ANALISA SARINGAN
1" 25 0.00 0.00 0.00 100.00 0.00 0.00 0.00 100.00 100.00
3/4" 19 0.00 0.00 0.00 100.00 0.00 0.00 0.00 100.00 100.00
1/2" 12.5 2100.00 2100.00 67.89 32.11 2076.10 2076.10 66.88 33.12 32.62
3/8" 9.5 874.40 2974.40 96.16 3.84 903.60 2979.70 95.99 4.01 3.93
#4 4.75 89.30 3063.70 99.04 0.96 90.40 3070.10 98.90 1.10 1.03
#8 2.36 3.90 3067.60 99.17 0.83 5.80 3075.90 99.09 0.91 0.87
#16 1.18 0.70 3068.30 99.19 0.81 1.30 3077.20 99.13 0.87 0.84
#30 0.6 0.00 3068.30 99.19 0.81 0.00 3077.20 99.13 0.87 0.84
#50 0.3 0.00 3068.30 99.19 0.81 0.00 3077.20 99.13 0.87 0.84
#100 0.15 0.00 3068.30 99.19 0.81 0.00 3077.20 99.13 0.87 0.84
#200 0.075 0.00 3068.30 99.19 0.81 0.00 3077.20 99.13 0.87 0.84
1" 25 0.00 0.00 0.00 100.00 0.00 0.00 0.00 100.00 100.00
3/4" 19 0.00 0.00 0.00 100.00 0.00 0.00 0.00 100.00 100.00
1/2" 12.5 0.00 0.00 0.00 100.00 0.00 0.00 0.00 100.00 100.00
3/8" 9.5 0.00 0.00 0.00 100.00 0.00 0.00 0.00 100.00 100.00
#4 4.75 18.70 18.70 1.81 98.19 26.80 26.80 2.42 97.58 97.88
#8 2.36 75.90 94.60 9.17 90.83 74.50 101.30 9.16 90.84 90.84
#16 1.18 89.60 184.20 17.86 82.14 93.90 195.20 17.65 82.35 82.25
#30 0.6 227.80 412.00 39.94 60.06 235.90 431.10 38.97 61.03 60.54
#50 0.3 220.70 632.70 61.34 38.66 239.60 670.70 60.63 39.37 39.02
#100 0.15 301.60 934.30 90.58 9.42 336.00 1006.70 91.01 8.99 9.21
#200 0.075 57.10 991.40 96.11 3.89 55.10 1061.80 95.99 4.01 3.95
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI SULAWESI UTARA PENYEDIA JASA
PPK 2.2 BUYAT-MOLOBOG-ONGGUNOI PT. GLOBAL CIPTA PERKASA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI SULAWESI UTARA PENYEDIA JASA
PPK 2.2 BUYAT-MOLOBOG-ONGGUNOI CV. BHAKTI MEGAH MULIA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI SULAWESI UTARA PENYEDIA JASA
PPK 2.2 BUYAT-MOLOBOG-ONGGUNOI CV. BHAKTI MEGAH MULIA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI SULAWESI UTARA PENYEDIA JASA
PPK 2.2 BUYAT-MOLOBOG-ONGGUNOI CV. BHAKTI MEGAH MULIA