REPUBLIK INDONESIA

KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT


DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XVIII
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH V PROVINSI PAPUA (PUNCAKJAYA)
KEGIATAN V.1 SATKER PELAKSANAAN JALAN NASIONAL WILAYAH V PROVINSI PAPUA (PUNCAKJAYA)

PAKET : REKONSTRUKSI JALAN KARUBAGA ILU MULIA (MYC)


NOMOR KONTRAK : HK.02.03/PW.MYC.KRBG-ILU-MULIA/APBN/P2JN-PUA/074/2017
TANGGAL KONTRAK : 13 OKTOBER 2017
NILAI KONTRAK : Rp. 326.474.388.000,- (Termasuk PPN)
PENYEDIA JASA : PT. MODERN WIDYA TEHNICAL
SUMBER DANA : APBN 2017-2019
DAFTAR KUANTITAS
Satker : Pelaksanaan Jalan Nasional Wil. V Provinsi Papua (Puncak Jaya)
Kegiatan : PPK V.1
Paket : Rekonstruksi Jalan Karubaga - Ilu - Mulia (MYC)
Kontraktor : PT. Modern Widya Technical
Tahun : 2017 - 2019
NOMOR VOLUME
MATA JENIS PEKERJAAN SAT KONTRAK Ket
AWAL MC 0%
PEMB.

DIV I UMUM
1.2 Mobilisasi LS 1.00 1.00 Tetap
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 1.00 1.00 Tetap
1.21 Manajemen Mutu LS 1.00 1.00 Tetap

DIV II DRAINASE
2.1.1 Galian untuk Selokan Drainase dan Saluran Air m3 12,650.00 25,903.90 Bertambah
2.2.1 Pasangan Batu dengan Mortar m3 3,105.00 3,400.27 Bertambah
2.3.(5) Gorong2 Pipa Baja Gelombang Ton 47.04 51.78 Bertambah

DIV III PEKERJAAN TANAH


3.1.(1a) Galian Tanah m3 408,393.15 447,727.41 Bertambah
3.2.(1b) Timbunan Biasa dari galian m3 17,820.86 11,473.44 Berkurang
3.2.(2a) Timbunan Pilihan dari sumber galian m3 52,169.25 50,379.90 Berkurang
3.3.(1) Penyiapan Badan Jalan m2 220,500.00 225,900.00 Bertambah

DIV V PERKERASAN BERBUTIR


5.1.(1) Lapis Pondasi Agregat Kelas A m3 36,750.00 37,650.00 Bertambah
5.1.(B) Lapis Pondasi Agregat Kelas B m3 18,375.00 18,825.00 Bertambah

DIV VI PERKERASAN ASPAL


6.1.(1a) Lapis Resap Pengikat - Aspal Cair Ltr 147,000.00 105,420.00 Berkurang
6.3.(4a) Lataston Lapis Pondasi (HRS-Base) 5 cm (gradasi senjang/semi senjang) Ton 16,390.50 17,093.10 Bertambah
6.3.(8) Bahan anti pengelupasan Kg 3,196.15 3,261.38 Bertambah

DIV VII STRUKTUR


7.1.(7a) Beton mutu sedang fc’20 MPa m3 24.29 249.55 Bertambah
7.1.(8) Beton mutu rendah fc’15 MPa m3 1,350.00 6.75 Berkurang
7.3.(1) Baja Tulangan U 24 Polos Kg 3,546.68 28,450.17 Bertambah
7.9.(1) Pasangan Batu m3 881.85 998.43 Bertambah
7.10.(3a) Bronjong dengan kawat yang dilapisi galvanis m3 240.00 1,524.00 Bertambah

DIV VIII PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR


8.4.(1) Marka Jalan Termoplastik m2 1,837.50 1,837.50 Tetap
8.4.(5) Patok Pengarah Buah 400.00 400.00 Tetap
8.4.(6a) Patok Kilometer Buah 25.00 25.00 Tetap

DIV X PEKERJAAN PEMELIHARAAN RUTIN


10.1.2 Pemeliharaan Rutin Bahu Jalan dan pemotongan rumput m2 490,000.00 - Dihilangkan
10.1.3 Pemeliharaan Rutin Selokan, Saluran Air, Galian dan Timbunan m' 23,000.00 23,000.00 Tetap

MENGETAHUI OLEH : DIBUAT OLEH :


PEJABAT PEMBUAT KOMITMEN V.1 Diperiksa Oleh: PENYEDIA JASA
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) Konsultan Supervisi PT. MODERN WIDYA TEHNICAL
PT. YODYA KARYA (Konsultan)
PT. DHARMA ABADI KONSULTAN, JO

GAMAL PANJAITAN, ST DWI BUDI WAHONO, ST


NIP : 19641206 200604 1 001 Pimpinan Cabang
MASDIN MARZUKI ,ST
Supervision Engineer
BACK UP MC - 0
PAKET : REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)

Kontraktor : PT. Modern Widya Tehnical


Kode Pembayaran : 1.2
Jenis Pekerjaan : Mobilisasi

VOLUME
NO URAIAN PEKERJAAN
Ls

1. Mobilisasi 1.00

TOTAL VOLUME 1.00

DISETUJUI OLEH : DIPERIKSA : DIBUAT OLEH :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA(PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK PT. DHARMA ABADI
JAYA) KONSULTAN, JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST. GERSON F.KENDENAN,ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
BACK UP MC - 0
PAKET : REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)

Kontraktor : PT. Modern Widya Tehnical


Kode Pembayaran : 1.8 (1)
Jenis Pekerjaan : Manajemen dan Keselamatan Lalu Lintas

VOLUME
NO URAIAN PEKERJAAN
Ls

1. Manajemen dan Keselamatan Lalu Lintas 1.00

TOTAL VOLUME 1.00


DISETUJUI OLEH : DIPERIKSA : DIBUAT OLEH :
KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA(PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK PT. DHARMA ABADI KONSULTAN, JO
JAYA)

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST. GERSON F.KENDENAN,ST.


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
BACK UP MC - 0
PAKET : REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)

Kontraktor : PT. Modern Widya Tehnical


Kode Pembayaran : 1.21
Jenis Pekerjaan : Manajemen Mutu

VOLUME
NO URAIAN PEKERJAAN
Ls

1. Manajemen Mutu 1.00

TOTAL VOLUME 1.00

DISETUJUI OLEH : DIPERIKSA : DIBUAT OLEH :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA(PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI KONSULTAN, JO

SYAHBULLAH PAEMBONAN, ST
NIP : 19891226 201012 1 004 RIZAL SARIB, ST. GERSON F.KENDENAN,ST.
QUANTITY ENGINEER SITE MANAGER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

GALIAN UNTUK SELOKAN DAN SALURAN AIR

Dimensi
VOLUME
STA Panjang (m) L Atas L Bawah Tinggi KET.
(m) (m) (m) (m3)

00 + 000 s/d 05 + 000 5,000.00 1.20 1.00 1.00 5,500.00


Cek Ulang Sesuaikan Dimensi
Pasangan Batu
05 + 000 s/d 08 + 450 3,450.00 1.20 1.00 1.00 3,795.00

08 + 500 s/d 09 + 525 1,025.00 1.20 1.00 1.00 1,127.50

09 + 575 s/d 10 + 125 550.00 1.20 1.00 1.00 605.00

10 + 200 s/d 10 + 500 300.00 1.20 1.00 1.00 330.00

10 + 550 s/d 10 + 800 250.00 1.20 1.00 1.00 275.00

10 + 850 s/d 11 + 000 150.00 1.20 1.00 1.00 165.00

11 + 100 s/d 13 + 725 2,625.00 1.20 1.00 1.00 2,887.50

13 + 775 s/d 15 + 125 1,350.00 1.20 1.00 1.00 1,485.00

15 + 175 s/d 16 + 225 1,050.00 1.20 1.00 1.00 1,155.00

16 + 275 s/d 18 + 325 2,050.00 1.20 1.00 1.00 2,255.00

18 + 400 s/d 18 + 900 500.00 1.20 1.00 1.00 550.00

18 + 975 s/d 22 + 150 3,175.00 1.20 1.00 1.00 3,492.50

22 + 526 s/d 24 + 400 1,874.00 1.20 1.00 1.00 2,061.40

24 + 900 s/d 25 + 100 200.00 1.20 1.00 1.00 220.00

VOLUME 25903.90
VOLUME LEMBAR SEBELUMNYA 0.00
VOLUME SAMPAI LEMBAR INI 25903.90
VOLUME GALIAN SALURAN 25903.90
DISETUJUI
KOORDINATOR PENGAWAS LAPANGAN DIBUAT : DIPERIKSA
PEJABAT PEMBUAT KOMITMEN V.1 PENYEDIA JASA KONSULTAN
SATKER PJN WIL. V PROV. PAPUA (PUNCAK PT. MODERN WIDYA TEHNICAL PT. YODYA KARYA(PERSERO)
JAYA) PT.DHARMA ABADI KONSULTAN, JO.

SYAHBULLAH PAEMBONAN, ST GERSON F.KENDENAN, ST. RIZAL SARIB, ST.


NIP : 19891226 201012 1 004 SITE MANAGER QUANTITY ENGINEER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

PASANGAN BATU DENGAN MORTAR

LOKASI PANJANG DIMENSI SALURAN LUAS VOLUME


NO KR/KN KET
( STA ) (M) La1 Lb1 H1 La2 Lb2 H2 ( M2 ) (M3)

24 + 214 - 25 + 050 836.00 1.20 1.00 1.00 0.80 0.60 0.80 0.540 451.44

21 + 322 - 23 + 939 2,617.00 1.20 1.00 1.00 0.80 0.60 0.80 0.540 1,413.18

20 + 808 - 21 + 200 392.00 1.20 1.00 1.00 0.80 0.60 0.80 0.540 211.68

03 + 673 - 05 + 403 1,730.00 1.20 1.00 1.00 0.80 0.60 0.80 0.540 934.20

20 + 430 - 20 + 630 200.00 1.60 1.20 1.60 1.20 0.80 1.40 0.84 168.00

DIMENSI TALUD DIMENSI SALURAN


LUAS TOTAL VOLUME
A B H LUAS La1 Lb1 H1 La2 Lb2 H2 LUAS
(m) (m) (m) ( M2 ) (m) (m) (m) (m) (m) (m) ( M2 ) ( M2 ) (M3)

05 + 403 - 05 + 603 165.50 0.30 0.80 2.00 1.10 0.80 0.80 1.00 0.80 0.60 0.80 0.24 1.34 222

5,940.50
VOLUME 3,400
VOLUME LEMBAR SEBELUMNYA -
VOLUME SAMPAI LEMBAR INI 3,400
VOLUME PASANGAN BATU DENGAN MORTAR 3,400
DISETUJUI DIPERIKSA DIBUAT :
KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA(PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT.DHARMA ABADI KONSULTAN, JO.

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST. GERSON.F KENDENAN ST.


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
QUANTITY ENGINEER
SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST. GERSON.F KENDENAN ST.
NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
QUANTITY ENGINEER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

Timbunan Biasa

LEBAR TEBAL PANJANG VOLUME


NO KM / S T A SKETSA KET
(M) (M) (M) (M3)

1+500 8.00 0.40


535.45 1,713.44
2+035 8.00 0.40

4+090 8.00 0.40


1,550.00 4,960.00
5+640 8.00 0.40

8+000 8.00 0.40


1,500.00 4,800.00
9+500 8.00 0.40

JUMLAH ..... ( L1 ) 11,473.44


TOTAL

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST GERSON.F,KENDENAN .ST,


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
1800.00

1600.00

1400.00

1200.00

1000.00
Row 37
Row 38
Row 39
800.00

600.00

400.00

200.00

0.00
1 2 3 4
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

1m 3m

LPB
HRS WC
TIMBUNAN PILIHAN LPA

LAPIS PONDASI BAWAH (LPB)

LEBAR TEBAL LUAS


LEBAR TEBAL PANJANG VOLUME
STA RATA-RATA RATA-RATA RATA-RATA KET.
(m') (m') (m) (m) (m2) (m') (m3)

25 + 100 6.00 0.125


6.00 0.125 0.75 100.00 75.00
25 + 000 6.00 0.125
6.00 0.125 0.75 100.00 75.00
24 + 900 6.00 0.125
6.00 0.125 0.75 100.00 75.00
24 + 800 6.00 0.125
6.00 0.125 0.75 100.00 75.00
24 + 700 6.00 0.125
6.00 0.125 0.75 100.00 75.00
24 + 600 6.00 0.125
6.00 0.125 0.75 100.00 75.00
24 + 500 6.00 0.125
6.00 0.125 0.75 100.00 75.00
24 + 400 6.00 0.125
6.00 0.125 0.75 100.00 75.00
24 + 300 6.00 0.125
6.00 0.125 0.75 100.00 75.00
24 + 200 6.00 0.125
6.00 0.125 0.75 100.00 75.00
24 + 100 6.00 0.125
6.00 0.125 0.75 85.00 63.75 24+059 Kali Semen (15 M)
24 + 000 6.00 0.125
6.00 0.125 0.75 100.00 75.00
23 + 900 6.00 0.125
6.00 0.125 0.75 100.00 75.00
23 + 800 6.00 0.125
6.00 0.125 0.75 100.00 75.00
23 + 700 6.00 0.125
6.00 0.125 0.75 100.00 75.00
23 + 600 6.00 0.125
6.00 0.125 0.75 100.00 75.00
23 + 500 6.00 0.125
6.00 0.125 0.75 100.00 75.00
23 + 400 6.00 0.125
6.00 0.125 0.75 100.00 75.00
23 + 300 6.00 0.125
6.00 0.125 0.75 90.00 67.50 23+200 Jembatan (10 M)
23 + 200 6.00 0.125
VOLUME 1,406.25
VOLUME LEMBAR SEBELUMNYA -
VOLUME SAMPAI LEMBAR INI 1,406.25
VOLUME LAPIS PONDASI BAWAH (LPB) 1,406.25

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST RIAN PRIBOWO, ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

1m 3m

LPB
HRS WC
TIMBUNAN PILIHAN LPA

LAPIS PONDASI BAWAH (LPB)

LEBAR TEBAL LUAS


LEBAR TEBAL PANJANG VOLUME
STA RATA-RATA RATA-RATA RATA-RATA KET.
(m') (m') (m) (m) (m )
2
(m') (m3)

23 + 200 6.00 0.125


6.00 0.125 0.75 100.00 75.00
23 + 100 6.00 0.125
6.00 0.125 0.75 100.00 75.00
23 + 000 6.00 0.125
6.00 0.125 0.75 100.00 75.00
22 + 900 6.00 0.125
6.00 0.125 0.75 100.00 75.00
22 + 800 6.00 0.125
6.00 0.125 0.75 100.00 75.00
22 + 700 6.00 0.125
6.00 0.125 0.75 100.00 75.00
22 + 600 6.00 0.125
6.00 0.125 0.75 100.00 75.00
22 + 500 6.00 0.125
6.00 0.125 0.75 100.00 75.00
22 + 400 6.00 0.125
6.00 0.125 0.75 100.00 75.00
22 + 300 6.00 0.125
6.00 0.125 0.75 100.00 75.00
22 + 200 6.00 0.125
6.00 0.125 0.75 100.00 75.00
22 + 100 6.00 0.125
6.00 0.125 0.75 100.00 75.00
22 + 000 6.00 0.125
6.00 0.125 0.75 100.00 75.00
21 + 900 6.00 0.125
6.00 0.125 0.75 100.00 75.00
21 + 800 6.00 0.125
6.00 0.125 0.75 100.00 75.00
21 + 700 6.00 0.125
6.00 0.125 0.75 100.00 75.00
21 + 600 6.00 0.125
6.00 0.125 0.75 100.00 75.00
21 + 500 6.00 0.125
6.00 0.125 0.75 100.00 75.00
21 + 400 6.00 0.125
6.00 0.125 0.75 100.00 75.00
21 + 300 6.00 0.125
VOLUME 1,425.00
VOLUME LEMBAR SEBELUMNYA 1,406.25
VOLUME SAMPAI LEMBAR INI 2,831.25
VOLUME LAPIS PONDASI BAWAH (LPB) 2,831.25

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST RIAN PRIBOWO, ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

1m 3m

LPB
HRS WC
TIMBUNAN PILIHAN LPA

LAPIS PONDASI BAWAH (LPB)

LEBAR TEBAL LUAS


LEBAR TEBAL PANJANG VOLUME
STA RATA-RATA RATA-RATA RATA-RATA KET.
(m') (m') (m) (m) (m2) (m') (m3)

21 + 300 6.00 0.125


6.00 0.125 0.75 100.00 75.00
21 + 200 6.00 0.125
6.00 0.125 0.75 100.00 75.00
21 + 100 6.00 0.125
6.00 0.125 0.75 100.00 75.00
21 + 000 6.00 0.125
6.00 0.125 0.75 100.00 75.00
20 + 900 6.00 0.125
6.00 0.125 0.75 100.00 75.00
20 + 800 6.00 0.125
6.00 0.125 0.75 100.00 75.00
20 + 700 6.00 0.125
6.00 0.125 0.75 100.00 75.00
20 + 600 6.00 0.125
6.00 0.125 0.75 100.00 75.00
20 + 500 6.00 0.125
6.00 0.125 0.75 100.00 75.00
20 + 400 6.00 0.125
6.00 0.125 0.75 100.00 75.00
20 + 300 6.00 0.125
6.00 0.125 0.75 100.00 75.00
20 + 200 6.00 0.125
6.00 0.125 0.75 100.00 75.00
20 + 100 6.00 0.125
6.00 0.125 0.75 100.00 75.00
20 + 000 6.00 0.125
6.00 0.125 0.75 100.00 75.00
19 + 900 6.00 0.125
6.00 0.125 0.75 100.00 75.00
19 + 800 6.00 0.125
6.00 0.125 0.75 100.00 75.00
19 + 700 6.00 0.125
6.00 0.125 0.75 100.00 75.00
19 + 600 6.00 0.125
6.00 0.125 0.75 100.00 75.00
19 + 500 6.00 0.125
6.00 0.125 0.75 100.00 75.00
19 + 400 6.00 0.125
VOLUME 1,425.00
VOLUME LEMBAR SEBELUMNYA 2,831.25
VOLUME SAMPAI LEMBAR INI 4,256.25
VOLUME LAPIS PONDASI BAWAH (LPB) 4,256.25

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST GERSON .F.KENDENAN, ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

1m 3m

LPB
HRS WC
TIMBUNAN PILIHAN LPA

LAPIS PONDASI BAWAH (LPB)

LEBAR TEBAL LUAS


LEBAR TEBAL PANJANG VOLUME
STA RATA-RATA RATA-RATA RATA-RATA KET.
(m') (m') (m) (m) (m2) (m') (m3)

19 + 400 6.00 0.125


6.00 0.125 0.75 100.00 75.00
19 + 300 6.00 0.125
6.00 0.125 0.75 100.00 75.00
19 + 200 6.00 0.125
6.00 0.125 0.75 100.00 75.00
19 + 100 6.00 0.125
6.00 0.125 0.75 100.00 75.00
19 + 000 6.00 0.125
6.00 0.125 0.75 100.00 75.00
18 + 900 6.00 0.125
6.00 0.125 0.75 100.00 75.00
18 + 800 6.00 0.125
6.00 0.125 0.75 100.00 75.00
18 + 700 6.00 0.125
6.00 0.125 0.75 100.00 75.00
18 + 600 6.00 0.125
6.00 0.125 0.75 100.00 75.00
18 + 500 6.00 0.125
6.00 0.125 0.75 100.00 75.00
18 + 400 6.00 0.125
6.00 0.125 0.75 100.00 75.00
18 + 300 6.00 0.125
6.00 0.125 0.75 100.00 75.00
18 + 200 6.00 0.125
6.00 0.125 0.75 100.00 75.00
18 + 100 6.00 0.125
6.00 0.125 0.75 100.00 75.00
18 + 000 6.00 0.125
6.00 0.125 0.75 100.00 75.00
17 + 900 6.00 0.125
6.00 0.125 0.75 100.00 75.00
17 + 800 6.00 0.125
6.00 0.125 0.75 100.00 75.00
17 + 700 6.00 0.125
6.00 0.125 0.75 100.00 75.00
17 + 600 6.00 0.125
6.00 0.125 0.75 100.00 75.00
17 + 500 6.00 0.125
VOLUME 1,425.00
VOLUME LEMBAR SEBELUMNYA 4,256.25
VOLUME SAMPAI LEMBAR INI 5,681.25
VOLUME LAPIS PONDASI BAWAH (LPB) 5,681.25

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST RIAN PRIBOWO, ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

1m 3m

LPB
HRS WC
TIMBUNAN PILIHAN LPA

LAPIS PONDASI BAWAH (LPB)

LEBAR TEBAL LUAS


LEBAR TEBAL PANJANG VOLUME
STA RATA-RATA RATA-RATA RATA-RATA KET.
(m') (m') (m) (m) (m2) (m') (m3)

17 + 500 6.00 0.125


6.00 0.125 0.75 100.00 75.00
17 + 400 6.00 0.125
6.00 0.125 0.75 100.00 75.00
17 + 300 6.00 0.125
6.00 0.125 0.75 100.00 75.00
17 + 200 6.00 0.125
6.00 0.125 0.75 100.00 75.00
17 + 100 6.00 0.125
6.00 0.125 0.75 100.00 75.00
17 + 000 6.00 0.125
6.00 0.125 0.75 100.00 75.00
16 + 900 6.00 0.125
6.00 0.125 0.75 100.00 75.00
16 + 800 6.00 0.125
6.00 0.125 0.75 100.00 75.00
16 + 700 6.00 0.125
6.00 0.125 0.75 100.00 75.00
16 + 600 6.00 0.125
6.00 0.125 0.75 100.00 75.00
16 + 500 6.00 0.125
6.00 0.125 0.75 100.00 75.00
16 + 400 6.00 0.125
6.00 0.125 0.75 100.00 75.00
16 + 300 6.00 0.125
6.00 0.125 0.75 100.00 75.00
16 + 200 6.00 0.125
6.00 0.125 0.75 100.00 75.00
16 + 100 6.00 0.125
6.00 0.125 0.75 100.00 75.00
16 + 000 6.00 0.125
6.00 0.125 0.75 100.00 75.00
15 + 900 6.00 0.125
6.00 0.125 0.75 100.00 75.00
15 + 800 6.00 0.125
6.00 0.125 0.75 100.00 75.00
15 + 700 6.00 0.125
6.00 0.125 0.75 100.00 75.00
15 + 600 6.00 0.125
VOLUME 1,425.00
VOLUME LEMBAR SEBELUMNYA 5,681.25
VOLUME SAMPAI LEMBAR INI 7,106.25
VOLUME LAPIS PONDASI BAWAH (LPB) 7,106.25

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST RIAN PRIBOWO, ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

1m 3m
LPB
HRS WC
TIMBUNAN PILIHAN LPA

LAPIS PONDASI BAWAH (LPB)

LEBAR TEBAL LUAS


LEBAR TEBAL PANJANG VOLUME
STA RATA-RATA RATA-RATA RATA-RATA KET.
(m') (m') (m) (m) (m2) (m') (m3)

15 + 600 6.00 0.125


6.00 0.125 0.75 100.00 75.00
15 + 500 6.00 0.125
6.00 0.125 0.75 100.00 75.00
15 + 400 6.00 0.125
6.00 0.125 0.75 100.00 75.00
15 + 300 6.00 0.125
6.00 0.125 0.75 100.00 75.00
15 + 200 6.00 0.125
6.00 0.125 0.75 100.00 75.00
15 + 100 6.00 0.125
6.00 0.125 0.75 100.00 75.00
15 + 000 6.00 0.125
6.00 0.125 0.75 100.00 75.00
14 + 900 6.00 0.125
6.00 0.125 0.75 100.00 75.00
14 + 800 6.00 0.125
6.00 0.125 0.75 90.00 67.50 14+735 Jembatan (10 M)
14 + 700 6.00 0.125
6.00 0.125 0.75 100.00 75.00
14 + 600 6.00 0.125
6.00 0.125 0.75 100.00 75.00
14 + 500 6.00 0.125
6.00 0.125 0.75 100.00 75.00
14 + 400 6.00 0.125
6.00 0.125 0.75 100.00 75.00
14 + 300 6.00 0.125
6.00 0.125 0.75 100.00 75.00
14 + 200 6.00 0.125
6.00 0.125 0.75 100.00 75.00
14 + 100 6.00 0.125
6.00 0.125 0.75 100.00 75.00
14 + 000 6.00 0.125
6.00 0.125 0.75 100.00 75.00
13 + 900 6.00 0.125
6.00 0.125 0.75 80.00 60.00 13+800 Jembatan Gurage(20 M)
13 + 800 6.00 0.125
6.00 0.125 0.75 100.00 75.00
13 + 700 6.00 0.125
VOLUME 1,402.50
VOLUME LEMBAR SEBELUMNYA 7,106.25
VOLUME SAMPAI LEMBAR INI 8,508.75
VOLUME LAPIS PONDASI BAWAH (LPB) 8,508.75

DISETUJUI DI PERIKSA:
KONSULTAN DIBUAT :
KOORDINATOR PENGAWAS LAPANGAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO)
PT. DHARMA ABADI CONSULTAN. JO PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA)

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST


QUANTITY ENGINEER RIAN PRIBOWO, ST
NIP : 19891226 201012 1 004 SITE MANAGER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

1m 3m

LPB
HRS WC
TIMBUNAN PILIHAN LPA

LAPIS PONDASI BAWAH (LPB)

LEBAR TEBAL LUAS


LEBAR TEBAL PANJANG VOLUME
STA RATA-RATA RATA-RATA RATA-RATA KET.
(m') (m') (m) (m) (m2) (m') (m3)

13 + 700 6.00 0.125


6.00 0.125 0.75 100.00 75.00
13 + 600 6.00 0.125
6.00 0.125 0.75 100.00 75.00
13 + 500 6.00 0.125
6.00 0.125 0.75 100.00 75.00
13 + 400 6.00 0.125
6.00 0.125 0.75 100.00 75.00
13 + 300 6.00 0.125
6.00 0.125 0.75 100.00 75.00
13 + 200 6.00 0.125
6.00 0.125 0.75 100.00 75.00
13 + 100 6.00 0.125
6.00 0.125 0.75 100.00 75.00
13 + 000 6.00 0.125
6.00 0.125 0.75 100.00 75.00
12 + 900 6.00 0.125
6.00 0.125 0.75 100.00 75.00
12 + 800 6.00 0.125
6.00 0.125 0.75 100.00 75.00
12 + 700 6.00 0.125
6.00 0.125 0.75 100.00 75.00
12 + 600 6.00 0.125
6.00 0.125 0.75 100.00 75.00
12 + 500 6.00 0.125
6.00 0.125 0.75 100.00 75.00
12 + 400 6.00 0.125
6.00 0.125 0.75 100.00 75.00
12 + 300 6.00 0.125
6.00 0.125 0.75 100.00 75.00
12 + 200 6.00 0.125
6.00 0.125 0.75 100.00 75.00
12 + 100 6.00 0.125
6.00 0.125 0.75 100.00 75.00
12 + 000 6.00 0.125
6.00 0.125 0.75 100.00 75.00
11 + 900 6.00 0.125
6.00 0.125 0.75 100.00 75.00
11 + 800 6.00 0.125
VOLUME 1,425.00
VOLUME LEMBAR SEBELUMNYA 8,508.75
VOLUME SAMPAI LEMBAR INI 9,933.75
VOLUME LAPIS PONDASI BAWAH (LPB) 9,933.75

DISETUJUI DI PERIKSA:
KONSULTAN DIBUAT :
KOORDINATOR PENGAWAS LAPANGAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO)
PT. DHARMA ABADI CONSULTAN. JO PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA)

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST


QUANTITY ENGINEER RIAN PRIBOWO, ST
NIP : 19891226 201012 1 004 SITE MANAGER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

1m 3m

LPB
HRS WC
TIMBUNAN PILIHAN LPA

LAPIS PONDASI BAWAH (LPB)

LEBAR TEBAL LUAS


LEBAR TEBAL PANJANG VOLUME
STA RATA-RATA RATA-RATA RATA-RATA KET.
(m') (m') (m) (m) (m2) (m') (m3)

11 + 800 6.00 0.125


6.00 0.125 0.75 100.00 75.00
11 + 700 6.00 0.125
6.00 0.125 0.75 100.00 75.00
11 + 600 6.00 0.125
6.00 0.125 0.75 100.00 75.00
11 + 500 6.00 0.125
6.00 0.125 0.75 100.00 75.00
11 + 400 6.00 0.125
6.00 0.125 0.75 100.00 75.00
11 + 300 6.00 0.125
6.00 0.125 0.75 100.00 75.00
11 + 200 6.00 0.125
6.00 0.125 0.75 100.00 75.00
11 + 100 6.00 0.125
6.00 0.125 0.75 100.00 75.00
11 + 000 6.00 0.125
6.00 0.125 0.75 100.00 75.00
10 + 900 6.00 0.125
6.00 0.125 0.75 100.00 75.00
10 + 800 6.00 0.125
6.00 0.125 0.75 100.00 75.00
10 + 700 6.00 0.125
6.00 0.125 0.75 100.00 75.00
10 + 600 6.00 0.125
6.00 0.125 0.75 100.00 75.00
10 + 500 6.00 0.125
6.00 0.125 0.75 100.00 75.00
10 + 400 6.00 0.125
6.00 0.125 0.75 100.00 75.00
10 + 300 6.00 0.125
6.00 0.125 0.75 100.00 75.00
10 + 200 6.00 0.125
6.00 0.125 0.75 100.00 75.00
10 + 100 6.00 0.125
6.00 0.125 0.75 100.00 75.00
10 + 000 6.00 0.125
6.00 0.125 0.75 100.00 75.00
09 + 900 6.00 0.125
VOLUME 1,425.00
VOLUME LEMBAR SEBELUMNYA 9,933.75
VOLUME SAMPAI LEMBAR INI 11,358.75
VOLUME LAPIS PONDASI BAWAH (LPB) 11,358.75

DISETUJUI DI PERIKSA:
KONSULTAN DIBUAT :
KOORDINATOR PENGAWAS LAPANGAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO)
PT. DHARMA ABADI CONSULTAN. JO PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA)

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST


QUANTITY ENGINEER RIAN PRIBOWO, ST
NIP : 19891226 201012 1 004 SITE MANAGER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

1m 3m

LPB
HRS WC
TIMBUNAN PILIHAN LPA

LAPIS PONDASI BAWAH (LPB)

LEBAR TEBAL LUAS


LEBAR TEBAL PANJANG VOLUME
STA RATA-RATA RATA-RATA RATA-RATA KET.
(m') (m') (m) (m) (m2) (m') (m3)

09 + 900 6.00 0.125


6.00 0.125 0.75 100.00 75.00
09 + 800 6.00 0.125
6.00 0.125 0.75 100.00 75.00
09 + 700 6.00 0.125
6.00 0.125 0.75 90.00 67.50 9+650 Jembatan (10 M)
09 + 600 6.00 0.125
6.00 0.125 0.75 100.00 75.00
09 + 500 6.00 0.125
6.00 0.125 0.75 100.00 75.00
09 + 400 6.00 0.125
6.00 0.125 0.75 100.00 75.00
09 + 300 6.00 0.125
6.00 0.125 0.75 100.00 75.00
09 + 200 6.00 0.125
6.00 0.125 0.75 100.00 75.00
09 + 100 6.00 0.125
6.00 0.125 0.75 100.00 75.00
09 + 000 6.00 0.125
6.00 0.125 0.75 100.00 75.00
08 + 900 6.00 0.125
6.00 0.125 0.75 100.00 75.00
08 + 800 6.00 0.125
6.00 0.125 0.75 100.00 75.00
08 + 700 6.00 0.125
6.00 0.125 0.75 100.00 75.00
08 + 600 6.00 0.125
6.00 0.125 0.75 100.00 75.00
08 + 500 6.00 0.125
6.00 0.125 0.75 100.00 75.00
08 + 400 6.00 0.125
6.00 0.125 0.75 100.00 75.00
08 + 300 6.00 0.125
6.00 0.125 0.75 100.00 75.00
08 + 200 6.00 0.125
6.00 0.125 0.75 100.00 75.00
08 + 100 6.00 0.125
6.00 0.125 0.75 100.00 75.00
08 + 000 6.00 0.125
VOLUME 1,417.50
VOLUME LEMBAR SEBELUMNYA 11,358.75
VOLUME SAMPAI LEMBAR INI 12,776.25
VOLUME LAPIS PONDASI BAWAH (LPB) 12,776.25

DISETUJUI DI PERIKSA:
KONSULTAN DIBUAT :
KOORDINATOR PENGAWAS LAPANGAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO)
PT. DHARMA ABADI CONSULTAN. JO PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA)

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST


QUANTITY ENGINEER RIAN PRIBOWO, ST
NIP : 19891226 201012 1 004 SITE MANAGER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

1m 3m

LPB
HRS WC
TIMBUNAN PILIHAN LPA

LAPIS PONDASI BAWAH (LPB)

LEBAR TEBAL LUAS


LEBAR TEBAL PANJANG VOLUME
STA RATA-RATA RATA-RATA RATA-RATA KET.
(m') (m') (m) (m) (m2) (m') (m3)

08 + 000 6.00 0.125


6.00 0.125 0.75 90.00 67.50 7+910 Jembatan (10 M)
07 + 900 6.00 0.125
6.00 0.125 0.75 100.00 75.00
07 + 800 6.00 0.125
6.00 0.125 0.75 100.00 75.00
07 + 700 6.00 0.125
6.00 0.125 0.75 100.00 75.00
07 + 600 6.00 0.125
6.00 0.125 0.75 100.00 75.00
07 + 500 6.00 0.125
6.00 0.125 0.75 100.00 75.00
07 + 400 6.00 0.125
6.00 0.125 0.75 100.00 75.00
07 + 300 6.00 0.125
6.00 0.125 0.75 100.00 75.00
07 + 200 6.00 0.125
6.00 0.125 0.75 100.00 75.00
07 + 100 6.00 0.125
6.00 0.125 0.75 100.00 75.00
07 + 000 6.00 0.125
6.00 0.125 0.75 100.00 75.00
06 + 900 6.00 0.125
6.00 0.125 0.75 100.00 75.00
06 + 800 6.00 0.125
6.00 0.125 0.75 100.00 75.00
06 + 700 6.00 0.125
6.00 0.125 0.75 100.00 75.00
06 + 600 6.00 0.125
6.00 0.125 0.75 100.00 75.00
06 + 500 6.00 0.125
6.00 0.125 0.75 100.00 75.00
06 + 400 6.00 0.125
6.00 0.125 0.75 100.00 75.00
06 + 300 6.00 0.125
6.00 0.125 0.75 100.00 75.00
06 + 200 6.00 0.125
6.00 0.125 0.75 100.00 75.00
06 + 100 6.00 0.125
VOLUME 1,417.50
VOLUME LEMBAR SEBELUMNYA 12,776.25
VOLUME SAMPAI LEMBAR INI 14,193.75
VOLUME LAPIS PONDASI BAWAH (LPB) 14,193.75

DISETUJUI DI PERIKSA:
KOORDINATOR PENGAWAS LAPANGAN KONSULTAN
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) DIBUAT :
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO PENYEDIA JASA
PT. MODERN WIDYA TEHNICAL

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER
RIAN PRIBOWO, ST
SITE MANAGER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

1m 3m

LPB
HRS WC
TIMBUNAN PILIHAN LPA

LAPIS PONDASI BAWAH (LPB)

LEBAR TEBAL LUAS


LEBAR TEBAL PANJANG VOLUME
STA RATA-RATA RATA-RATA RATA-RATA KET.
(m') (m') (m) (m) (m2) (m') (m3)

06 + 100 6.00 0.125


6.00 0.125 0.75 100.00 75.00
06 + 000 6.00 0.125
6.00 0.125 0.75 100.00 75.00
05 + 900 6.00 0.125
6.00 0.125 0.75 90.00 67.50 5+808 Kali (10 M )
05 + 800 6.00 0.125
6.00 0.125 0.75 100.00 75.00
05 + 700 6.00 0.125
6.00 0.125 0.75 100.00 75.00
05 + 600 6.00 0.125
6.00 0.125 0.75 100.00 75.00
05 + 500 6.00 0.125
6.00 0.125 0.75 100.00 75.00
05 + 400 6.00 0.125
6.00 0.125 0.75 100.00 75.00
05 + 300 6.00 0.125
6.00 0.125 0.75 100.00 75.00
05 + 200 6.00 0.125
6.00 0.125 0.75 100.00 75.00
05 + 100 6.00 0.125
6.00 0.125 0.75 100.00 75.00
05 + 000 6.00 0.125
6.00 0.125 0.75 100.00 75.00
04 + 900 6.00 0.125
6.00 0.125 0.75 100.00 75.00
04 + 800 6.00 0.125
6.00 0.125 0.75 100.00 75.00
04 + 700 6.00 0.125
6.00 0.125 0.75 100.00 75.00
04 + 600 6.00 0.125
6.00 0.125 0.75 100.00 75.00
04 + 500 6.00 0.125
6.00 0.125 0.75 100.00 75.00
04 + 400 6.00 0.125
6.00 0.125 0.75 100.00 75.00
04 + 300 6.00 0.125
6.00 0.125 0.75 100.00 75.00
04 + 200 6.00 0.125
VOLUME 1,417.50
VOLUME LEMBAR SEBELUMNYA 14,193.75
VOLUME SAMPAI LEMBAR INI 15,611.25
VOLUME LAPIS PONDASI BAWAH (LPB) 15,611.25

DISETUJUI DI PERIKSA:
KONSULTAN DIBUAT :
KOORDINATOR PENGAWAS LAPANGAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO)
PT. DHARMA ABADI CONSULTAN. JO PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA)

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST


QUANTITY ENGINEER RIAN PRIBOWO, ST
NIP : 19891226 201012 1 004 SITE MANAGER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

1m 3m

LPB
HRS WC
TIMBUNAN PILIHAN LPA

LAPIS PONDASI BAWAH (LPB)

LEBAR TEBAL LUAS


LEBAR TEBAL PANJANG VOLUME
STA RATA-RATA RATA-RATA RATA-RATA KET.
(m') (m') (m) (m) (m2) (m') (m3)

04 + 200 6.00 0.125


6.00 0.125 0.75 100.00 75.00
04 + 100 6.00 0.125
6.00 0.125 0.75 100.00 75.00
04 + 000 6.00 0.125
6.00 0.125 0.75 100.00 75.00
03 + 900 6.00 0.125
6.00 0.125 0.75 100.00 75.00
03 + 800 6.00 0.125
6.00 0.125 0.75 100.00 75.00
03 + 700 6.00 0.125
6.00 0.125 0.75 100.00 75.00
03 + 600 6.00 0.125
6.00 0.125 0.75 100.00 75.00
03 + 500 6.00 0.125
6.00 0.125 0.75 100.00 75.00
03 + 400 6.00 0.125
6.00 0.125 0.75 100.00 75.00
03 + 300 6.00 0.125
6.00 0.125 0.75 100.00 75.00
03 + 200 6.00 0.125
6.00 0.125 0.75 100.00 75.00
03 + 100 6.00 0.125
6.00 0.125 0.75 100.00 75.00
03 + 000 6.00 0.125
6.00 0.125 0.75 100.00 75.00
02 + 900 6.00 0.125
6.00 0.125 0.75 100.00 75.00
02 + 800 6.00 0.125
6.00 0.125 0.75 100.00 75.00
02 + 700 6.00 0.125
6.00 0.125 0.75 100.00 75.00
02 + 600 6.00 0.125
6.00 0.125 0.75 100.00 75.00
02 + 500 6.00 0.125
6.00 0.125 0.75 100.00 75.00
02 + 400 6.00 0.125
6.00 0.125 0.75 100.00 75.00
02 + 300 6.00 0.125
VOLUME 1,425.00
VOLUME LEMBAR SEBELUMNYA 15,611.25
VOLUME SAMPAI LEMBAR INI 17,036.25
VOLUME LAPIS PONDASI BAWAH (LPB) 17,036.25

DI PERIKSA: DIBUAT :
DISETUJUI PENYEDIA JASA
KOORDINATOR PENGAWAS LAPANGAN KONSULTAN
PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
PEJABAT PEMBUAT KOMITMEN V.1
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST RIAN PRIBOWO, ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

1m 3m

LPB
HRS WC
TIMBUNAN PILIHAN LPA

LAPIS PONDASI BAWAH (LPB)

LEBAR TEBAL LUAS


LEBAR TEBAL PANJANG VOLUME
STA RATA-RATA RATA-RATA RATA-RATA KET.
(m') (m') (m) (m) (m2) (m') (m3)

02 + 300 6.00 0.125


6.00 0.125 0.75 100.00 75.00
02 + 200 6.00 0.125
6.00 0.125 0.75 100.00 75.00
02 + 100 6.00 0.125
6.00 0.125 0.75 100.00 75.00
02 + 000 6.00 0.125
6.00 0.125 0.75 100.00 75.00
01 + 900 6.00 0.125
6.00 0.125 0.75 100.00 75.00
01 + 800 6.00 0.125
6.00 0.125 0.75 100.00 75.00
01 + 700 6.00 0.125
6.00 0.125 0.75 100.00 75.00
01 + 600 6.00 0.125
6.00 0.125 0.75 100.00 75.00
01 + 500 6.00 0.125
6.00 0.125 0.75 100.00 75.00
01 + 400 6.00 0.125
6.00 0.125 0.75 100.00 75.00
01 + 300 6.00 0.125
6.00 0.125 0.75 100.00 75.00
01 + 200 6.00 0.125
6.00 0.125 0.75 100.00 75.00
01 + 100 6.00 0.125
6.00 0.125 0.75 90.00 67.50 1+001 Kali (10 M)
01 + 000 6.00 0.125
6.00 0.125 0.75 100.00 75.00
00 + 900 6.00 0.125
6.00 0.125 0.75 100.00 75.00
00 + 800 6.00 0.125
6.00 0.125 0.75 100.00 75.00
00 + 700 6.00 0.125
6.00 0.125 0.75 100.00 75.00
00 + 600 6.00 0.125
6.00 0.125 0.75 100.00 75.00
00 + 500 6.00 0.125
6.00 0.125 0.75 100.00 75.00
00 + 400 6.00
VOLUME 1,417.50
VOLUME LEMBAR SEBELUMNYA 17,036.25
VOLUME SAMPAI LEMBAR INI 18,453.75
VOLUME LAPIS PONDASI BAWAH (LPB) 18,453.75

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST RIAN PRIBOWO, ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

1m 3m

LPB
HRS WC
TIMBUNAN PILIHAN LPA

LAPIS PONDASI BAWAH (LPB)

LEBAR TEBAL LUAS


LEBAR TEBAL PANJANG VOLUME
STA RATA-RATA RATA-RATA RATA-RATA KET.
(m') (m') (m) (m) (m2) (m') (m3)

00 + 400 6.00 0.125


6.00 0.125 0.75 100.00 75.00
00 + 300 6.00 0.125
6.00 0.125 0.75 100.00 75.00
00 + 200 6.00 0.125
6.00 0.125 0.75 100.00 75.00
00 + 100 6.00 0.125
6.00 0.125 0.75 100.00 75.00
00 + 000 6.00 0.125
6.00 0.125 0.75 95.00 71.25
00 + 095 6.00

VOLUME 371.25
VOLUME LEMBAR SEBELUMNYA 18,453.75
VOLUME SAMPAI LEMBAR INI 18,825.00
VOLUME LAPIS PONDASI BAWAH (LPB) 18,825.00

DISETUJUI DI PERIKSA:
KONSULTAN DIBUAT :
KOORDINATOR PENGAWAS LAPANGAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO)
PT. DHARMA ABADI CONSULTAN. JO PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA)

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST


QUANTITY ENGINEER RIAN PRIBOWO, ST
NIP : 19891226 201012 1 004 SITE MANAGER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

1m 3m

LPB
HRS WC
TIMBUNAN PILIHAN LPA

LAPIS PONDASI ATAS (LPA)

LEBAR TEBAL LUAS


LEBAR TEBAL PANJANG VOLUME
STA RATA-RATA RATA-RATA RATA-RATA KET.
(m') (m') (m) (m) (m )
2
(m') (m3)

25 + 100 6.00 0.250


6.00 0.250 1.50 100.00 150.00
25 + 000 6.00 0.250
6.00 0.250 1.50 100.00 150.00
24 + 900 6.00 0.250
6.00 0.250 1.50 100.00 150.00
24 + 800 6.00 0.250
6.00 0.250 1.50 100.00 150.00
24 + 700 6.00 0.250
6.00 0.250 1.50 100.00 150.00
24 + 600 6.00 0.250
6.00 0.250 1.50 100.00 150.00
24 + 500 6.00 0.250
6.00 0.250 1.50 100.00 150.00
24 + 400 6.00 0.250
6.00 0.250 1.50 100.00 150.00
24 + 300 6.00 0.250
6.00 0.250 1.50 100.00 150.00
24 + 200 6.00 0.250
6.00 0.250 1.50 100.00 150.00
24 + 100 6.00 0.250
6.00 0.250 1.50 85.00 127.50 24+059 Kali Semen (15 M)
24 + 000 6.00 0.250
6.00 0.250 1.50 100.00 150.00
23 + 900 6.00 0.250
6.00 0.250 1.50 100.00 150.00
23 + 800 6.00 0.250
6.00 0.250 1.50 100.00 150.00
23 + 700 6.00 0.250
6.00 0.250 1.50 100.00 150.00
23 + 600 6.00 0.250
6.00 0.250 1.50 100.00 150.00
23 + 500 6.00 0.250
6.00 0.250 1.50 100.00 150.00
23 + 400 6.00 0.250
6.00 0.250 1.50 100.00 150.00
23 + 300 6.00 0.250
6.00 0.250 1.50 90.00 135.00 23+200 Jembatan (10 M)
23 + 200 6.00 0.250
VOLUME 2,812.50
VOLUME LEMBAR SEBELUMNYA -
VOLUME SAMPAI LEMBAR INI 2,812.50
VOLUME LAPIS PONDASI ATAS (LPA) 2,812.50

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST RIAN PRIBOWO, ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
RIAN PRIBOWO, ST
SITE MANAGER

BACK UP DATA MC "0"


PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

1m 3m

LPB
HRS WC
TIMBUNAN PILIHAN LPA

LAPIS PONDASI ATAS (LPA)

LEBAR TEBAL LUAS


LEBAR TEBAL PANJANG VOLUME
STA RATA-RATA RATA-RATA RATA-RATA KET.
(m') (m') (m) (m) (m2) (m') (m3)

23 + 200 6.00 0.250


6.00 0.250 1.50 100.00 150.00
23 + 100 6.00 0.250
6.00 0.250 1.50 100.00 150.00
23 + 000 6.00 0.250
6.00 0.250 1.50 100.00 150.00
22 + 900 6.00 0.250
6.00 0.250 1.50 100.00 150.00
22 + 800 6.00 0.250
6.00 0.250 1.50 100.00 150.00
22 + 700 6.00 0.250
6.00 0.250 1.50 100.00 150.00
22 + 600 6.00 0.250
6.00 0.250 1.50 100.00 150.00
22 + 500 6.00 0.250
6.00 0.250 1.50 100.00 150.00
22 + 400 6.00 0.250
6.00 0.250 1.50 100.00 150.00
22 + 300 6.00 0.250
6.00 0.250 1.50 100.00 150.00
22 + 200 6.00 0.250
6.00 0.250 1.50 100.00 150.00
22 + 100 6.00 0.250
6.00 0.250 1.50 100.00 150.00
22 + 000 6.00 0.250
6.00 0.250 1.50 100.00 150.00
21 + 900 6.00 0.250
6.00 0.250 1.50 100.00 150.00
21 + 800 6.00 0.250
6.00 0.250 1.50 100.00 150.00
21 + 700 6.00 0.250
6.00 0.250 1.50 100.00 150.00
21 + 600 6.00 0.250
6.00 0.250 1.50 100.00 150.00
21 + 500 6.00 0.250
6.00 0.250 1.50 100.00 150.00
21 + 400 6.00 0.250
6.00 0.250 1.50 100.00 150.00
21 + 300 6.00 0.250
VOLUME 2,850.00
VOLUME LEMBAR SEBELUMNYA 2,812.50
VOLUME SAMPAI LEMBAR INI 5,662.50
VOLUME LAPIS PONDASI ATAS (LPA) 5,662.50

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST RIAN PRIBOWO, ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
RIAN PRIBOWO, ST
SITE MANAGER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

1m 3m
LPB
HRS WC
TIMBUNAN PILIHAN LPA

LAPIS PONDASI ATAS (LPA)

LEBAR TEBAL LUAS


LEBAR TEBAL PANJANG VOLUME
STA RATA-RATA RATA-RATA RATA-RATA KET.
(m') (m') (m) (m) (m )
2
(m') (m3)

21 + 300 6.00 0.250


6.00 0.250 1.50 100.00 150.00
21 + 200 6.00 0.250
6.00 0.250 1.50 100.00 150.00
21 + 100 6.00 0.250
6.00 0.250 1.50 100.00 150.00
21 + 000 6.00 0.250
6.00 0.250 1.50 100.00 150.00
20 + 900 6.00 0.250
6.00 0.250 1.50 100.00 150.00
20 + 800 6.00 0.250
6.00 0.250 1.50 100.00 150.00
20 + 700 6.00 0.250
6.00 0.250 1.50 100.00 150.00
20 + 600 6.00 0.250
6.00 0.250 1.50 100.00 150.00
20 + 500 6.00 0.250
6.00 0.250 1.50 100.00 150.00
20 + 400 6.00 0.250
6.00 0.250 1.50 100.00 150.00
20 + 300 6.00 0.250
6.00 0.250 1.50 100.00 150.00
20 + 200 6.00 0.250
6.00 0.250 1.50 100.00 150.00
20 + 100 6.00 0.250
6.00 0.250 1.50 100.00 150.00
20 + 000 6.00 0.250
6.00 0.250 1.50 100.00 150.00
19 + 900 6.00 0.250
6.00 0.250 1.50 100.00 150.00
19 + 800 6.00 0.250
6.00 0.250 1.50 100.00 150.00
19 + 700 6.00 0.250
6.00 0.250 1.50 100.00 150.00
19 + 600 6.00 0.250
6.00 0.250 1.50 100.00 150.00
19 + 500 6.00 0.250
6.00 0.250 1.50 100.00 150.00
19 + 400 6.00 0.250
VOLUME 2,850.00
VOLUME LEMBAR SEBELUMNYA 5,662.50
VOLUME SAMPAI LEMBAR INI 8,512.50
VOLUME LAPIS PONDASI ATAS (LPA) 8,512.50

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST RIAN PRIBOWO, ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
RIAN PRIBOWO, ST
SITE MANAGER

BACK UP DATA MC "0"


PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

1m 3m

LPB
HRS WC
TIMBUNAN PILIHAN LPA

LAPIS PONDASI ATAS (LPA)

LEBAR TEBAL LUAS


LEBAR TEBAL PANJANG VOLUME
STA RATA-RATA RATA-RATA RATA-RATA KET.
(m') (m') (m) (m) (m2) (m') (m3)

19 + 400 6.00 0.250


6.00 0.250 1.50 100.00 150.00
19 + 300 6.00 0.250
6.00 0.250 1.50 100.00 150.00
19 + 200 6.00 0.250
6.00 0.250 1.50 100.00 150.00
19 + 100 6.00 0.250
6.00 0.250 1.50 100.00 150.00
19 + 000 6.00 0.250
6.00 0.250 1.50 100.00 150.00
18 + 900 6.00 0.250
6.00 0.250 1.50 100.00 150.00
18 + 800 6.00 0.250
6.00 0.250 1.50 100.00 150.00
18 + 700 6.00 0.250
6.00 0.250 1.50 100.00 150.00
18 + 600 6.00 0.250
6.00 0.250 1.50 100.00 150.00
18 + 500 6.00 0.250
6.00 0.250 1.50 100.00 150.00
18 + 400 6.00 0.250
6.00 0.250 1.50 100.00 150.00
18 + 300 6.00 0.250
6.00 0.250 1.50 100.00 150.00
18 + 200 6.00 0.250
6.00 0.250 1.50 100.00 150.00
18 + 100 6.00 0.250
6.00 0.250 1.50 100.00 150.00
18 + 000 6.00 0.250
6.00 0.250 1.50 100.00 150.00
17 + 900 6.00 0.250
6.00 0.250 1.50 100.00 150.00
17 + 800 6.00 0.250
6.00 0.250 1.50 100.00 150.00
17 + 700 6.00 0.250
6.00 0.250 1.50 100.00 150.00
17 + 600 6.00 0.250
6.00 0.250 1.50 100.00 150.00
17 + 500 6.00 0.250
VOLUME 2,850.00
VOLUME LEMBAR SEBELUMNYA 8,512.50
VOLUME SAMPAI LEMBAR INI 11,362.50
VOLUME LAPIS PONDASI ATAS (LPA) 11,362.50

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST RIAN PRIBOWO, ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
RIAN PRIBOWO, ST
SITE MANAGER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

1m 3m
LPB
HRS WC
TIMBUNAN PILIHAN LPA

LAPIS PONDASI ATAS (LPA)

LEBAR TEBAL LUAS


LEBAR TEBAL PANJANG VOLUME
STA RATA-RATA RATA-RATA RATA-RATA KET.
(m') (m') (m) (m) (m )
2
(m') (m3)

17 + 500 6.00 0.250


6.00 0.250 1.50 100.00 150.00
17 + 400 6.00 0.250
6.00 0.250 1.50 100.00 150.00
17 + 300 6.00 0.250
6.00 0.250 1.50 100.00 150.00
17 + 200 6.00 0.250
6.00 0.250 1.50 100.00 150.00
17 + 100 6.00 0.250
6.00 0.250 1.50 100.00 150.00
17 + 000 6.00 0.250
6.00 0.250 1.50 100.00 150.00
16 + 900 6.00 0.250
6.00 0.250 1.50 100.00 150.00
16 + 800 6.00 0.250
6.00 0.250 1.50 100.00 150.00
16 + 700 6.00 0.250
6.00 0.250 1.50 100.00 150.00
16 + 600 6.00 0.250
6.00 0.250 1.50 100.00 150.00
16 + 500 6.00 0.250
6.00 0.250 1.50 100.00 150.00
16 + 400 6.00 0.250
6.00 0.250 1.50 100.00 150.00
16 + 300 6.00 0.250
6.00 0.250 1.50 100.00 150.00
16 + 200 6.00 0.250
6.00 0.250 1.50 100.00 150.00
16 + 100 6.00 0.250
6.00 0.250 1.50 100.00 150.00
16 + 000 6.00 0.250
6.00 0.250 1.50 100.00 150.00
15 + 900 6.00 0.250
6.00 0.250 1.50 100.00 150.00
15 + 800 6.00 0.250
6.00 0.250 1.50 100.00 150.00
15 + 700 6.00 0.250
6.00 0.250 1.50 100.00 150.00
15 + 600 6.00 0.250
VOLUME 2,850.00
VOLUME LEMBAR SEBELUMNYA 11,362.50
VOLUME SAMPAI LEMBAR INI 14,212.50
VOLUME LAPIS PONDASI ATAS (LPA) 14,212.50

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST RIAN PRIBOWO, ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

1m 3m
LPB
HRS WC
TIMBUNAN PILIHAN LPA

LAPIS PONDASI ATAS (LPA)

LEBAR TEBAL LUAS


LEBAR TEBAL PANJANG VOLUME
STA RATA-RATA RATA-RATA RATA-RATA KET.
(m') (m') (m) (m) (m )
2
(m') (m3)

15 + 600 6.00 0.250


6.00 0.250 1.50 100.00 150.00
15 + 500 6.00 0.250
6.00 0.250 1.50 100.00 150.00
15 + 400 6.00 0.250
6.00 0.250 1.50 100.00 150.00
15 + 300 6.00 0.250
6.00 0.250 1.50 100.00 150.00
15 + 200 6.00 0.250
6.00 0.250 1.50 100.00 150.00
15 + 100 6.00 0.250
6.00 0.250 1.50 100.00 150.00
15 + 000 6.00 0.250
6.00 0.250 1.50 100.00 150.00
14 + 900 6.00 0.250
6.00 0.250 1.50 100.00 150.00
14 + 800 6.00 0.250
6.00 0.250 1.50 90.00 135.00 14+735 Jembatan (10 M)
14 + 700 6.00 0.250
6.00 0.250 1.50 100.00 150.00
14 + 600 6.00 0.250
6.00 0.250 1.50 100.00 150.00
14 + 500 6.00 0.250
6.00 0.250 1.50 100.00 150.00
14 + 400 6.00 0.250
6.00 0.250 1.50 100.00 150.00
14 + 300 6.00 0.250
6.00 0.250 1.50 100.00 150.00
14 + 200 6.00 0.250
6.00 0.250 1.50 100.00 150.00
14 + 100 6.00 0.250
6.00 0.250 1.50 100.00 150.00
14 + 000 6.00 0.250
6.00 0.250 1.50 100.00 150.00
13 + 900 6.00 0.250
6.00 0.250 1.50 80.00 120.00 13+800 Jembatan Gurage(20 M)
13 + 800 6.00 0.250
6.00 0.250 1.50 100.00 150.00
13 + 700 6.00 0.250
VOLUME 2,805.00
VOLUME LEMBAR SEBELUMNYA 14,212.50
VOLUME SAMPAI LEMBAR INI 17,017.50
VOLUME LAPIS PONDASI ATAS (LPA) 17,017.50

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST RIAN PRIBOWO, ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

1m 3m
LPB
HRS WC
TIMBUNAN PILIHAN LPA

LAPIS PONDASI ATAS (LPA)

LEBAR TEBAL LUAS


LEBAR TEBAL PANJANG VOLUME
STA RATA-RATA RATA-RATA RATA-RATA KET.
(m') (m') (m) (m) (m )
2
(m') (m3)

13 + 700 6.00 0.250


6.00 0.250 1.50 100.00 150.00
13 + 600 6.00 0.250
6.00 0.250 1.50 100.00 150.00
13 + 500 6.00 0.250
6.00 0.250 1.50 100.00 150.00
13 + 400 6.00 0.250
6.00 0.250 1.50 100.00 150.00
13 + 300 6.00 0.250
6.00 0.250 1.50 100.00 150.00
13 + 200 6.00 0.250
6.00 0.250 1.50 100.00 150.00
13 + 100 6.00 0.250
6.00 0.250 1.50 100.00 150.00
13 + 000 6.00 0.250
6.00 0.250 1.50 100.00 150.00
12 + 900 6.00 0.250
6.00 0.250 1.50 100.00 150.00
12 + 800 6.00 0.250
6.00 0.250 1.50 100.00 150.00
12 + 700 6.00 0.250
6.00 0.250 1.50 100.00 150.00
12 + 600 6.00 0.250
6.00 0.250 1.50 100.00 150.00
12 + 500 6.00 0.250
6.00 0.250 1.50 100.00 150.00
12 + 400 6.00 0.250
6.00 0.250 1.50 100.00 150.00
12 + 300 6.00 0.250
6.00 0.250 1.50 100.00 150.00
12 + 200 6.00 0.250
6.00 0.250 1.50 100.00 150.00
12 + 100 6.00 0.250
6.00 0.250 1.50 100.00 150.00
12 + 000 6.00 0.250
6.00 0.250 1.50 100.00 150.00
11 + 900 6.00 0.250
6.00 0.250 1.50 100.00 150.00
11 + 800 6.00 0.250
VOLUME 2,850.00
VOLUME LEMBAR SEBELUMNYA 17,017.50
VOLUME SAMPAI LEMBAR INI 19,867.50
VOLUME LAPIS PONDASI ATAS (LPA) 19,867.50

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST RIAN PRIBOWO, ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

1m 3m
LPB
HRS WC
TIMBUNAN PILIHAN LPA

LAPIS PONDASI ATAS (LPA)

LEBAR TEBAL LUAS


LEBAR TEBAL PANJANG VOLUME
STA RATA-RATA RATA-RATA RATA-RATA KET.
(m') (m') (m) (m) (m )
2
(m') (m3)

11 + 800 6.00 0.250


6.00 0.250 1.50 100.00 150.00
11 + 700 6.00 0.250
6.00 0.250 1.50 100.00 150.00
11 + 600 6.00 0.250
6.00 0.250 1.50 100.00 150.00
11 + 500 6.00 0.250
6.00 0.250 1.50 100.00 150.00
11 + 400 6.00 0.250
6.00 0.250 1.50 100.00 150.00
11 + 300 6.00 0.250
6.00 0.250 1.50 100.00 150.00
11 + 200 6.00 0.250
6.00 0.250 1.50 100.00 150.00
11 + 100 6.00 0.250
6.00 0.250 1.50 100.00 150.00
11 + 000 6.00 0.250
6.00 0.250 1.50 100.00 150.00
10 + 900 6.00 0.250
6.00 0.250 1.50 100.00 150.00
10 + 800 6.00 0.250
6.00 0.250 1.50 100.00 150.00
10 + 700 6.00 0.250
6.00 0.250 1.50 100.00 150.00
10 + 600 6.00 0.250
6.00 0.250 1.50 100.00 150.00
10 + 500 6.00 0.250
6.00 0.250 1.50 100.00 150.00
10 + 400 6.00 0.250
6.00 0.250 1.50 100.00 150.00
10 + 300 6.00 0.250
6.00 0.250 1.50 100.00 150.00
10 + 200 6.00 0.250
6.00 0.250 1.50 100.00 150.00
10 + 100 6.00 0.250
6.00 0.250 1.50 100.00 150.00
10 + 000 6.00 0.250
6.00 0.250 1.50 100.00 150.00
09 + 900 6.00 0.250
VOLUME 2,850.00
VOLUME LEMBAR SEBELUMNYA 19,867.50
VOLUME SAMPAI LEMBAR INI 22,717.50
VOLUME LAPIS PONDASI ATAS (LPA) 22,717.50

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST RIAN PRIBOWO, ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

1m 3m
LPB
HRS WC
TIMBUNAN PILIHAN LPA

LAPIS PONDASI ATAS (LPA)

LEBAR TEBAL LUAS


LEBAR TEBAL PANJANG VOLUME
STA RATA-RATA RATA-RATA RATA-RATA KET.
(m') (m') (m) (m) (m )
2
(m') (m3)

09 + 900 6.00 0.250


6.00 0.250 1.50 100.00 150.00
09 + 800 6.00 0.250
6.00 0.250 1.50 100.00 150.00
09 + 700 6.00 0.250
6.00 0.250 1.50 90.00 135.00 9+650 Jembatan (10 M)
09 + 600 6.00 0.250
6.00 0.250 1.50 100.00 150.00
09 + 500 6.00 0.250
6.00 0.250 1.50 100.00 150.00
09 + 400 6.00 0.250
6.00 0.250 1.50 100.00 150.00
09 + 300 6.00 0.250
6.00 0.250 1.50 100.00 150.00
09 + 200 6.00 0.250
6.00 0.250 1.50 100.00 150.00
09 + 100 6.00 0.250
6.00 0.250 1.50 100.00 150.00
09 + 000 6.00 0.250
6.00 0.250 1.50 100.00 150.00
08 + 900 6.00 0.250
6.00 0.250 1.50 100.00 150.00
08 + 800 6.00 0.250
6.00 0.250 1.50 100.00 150.00
08 + 700 6.00 0.250
6.00 0.250 1.50 100.00 150.00
08 + 600 6.00 0.250
6.00 0.250 1.50 100.00 150.00
08 + 500 6.00 0.250
6.00 0.250 1.50 100.00 150.00
08 + 400 6.00 0.250
6.00 0.250 1.50 100.00 150.00
08 + 300 6.00 0.250
6.00 0.250 1.50 100.00 150.00
08 + 200 6.00 0.250
6.00 0.250 1.50 100.00 150.00
08 + 100 6.00 0.250
6.00 0.250 1.50 100.00 150.00
08 + 000 6.00 0.250
VOLUME 2,835.00
VOLUME LEMBAR SEBELUMNYA 22,717.50
VOLUME SAMPAI LEMBAR INI 25,552.50
VOLUME LAPIS PONDASI ATAS (LPA) 25,552.50

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST RIAN PRIBOWO, ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

1m 3m
LPB
HRS WC
TIMBUNAN PILIHAN LPA

LAPIS PONDASI ATAS (LPA)

LEBAR TEBAL LUAS


LEBAR TEBAL PANJANG VOLUME
STA RATA-RATA RATA-RATA RATA-RATA KET.
(m') (m') (m) (m) (m )
2
(m') (m3)

08 + 000 6.00 0.250


6.00 0.250 1.50 90.00 135.00 7+910 Jembatan (10 M)
07 + 900 6.00 0.250
6.00 0.250 1.50 100.00 150.00
07 + 800 6.00 0.250
6.00 0.250 1.50 100.00 150.00
07 + 700 6.00 0.250
6.00 0.250 1.50 100.00 150.00
07 + 600 6.00 0.250
6.00 0.250 1.50 100.00 150.00
07 + 500 6.00 0.250
6.00 0.250 1.50 100.00 150.00
07 + 400 6.00 0.250
6.00 0.250 1.50 100.00 150.00
07 + 300 6.00 0.250
6.00 0.250 1.50 100.00 150.00
07 + 200 6.00 0.250
6.00 0.250 1.50 100.00 150.00
07 + 100 6.00 0.250
6.00 0.250 1.50 100.00 150.00
07 + 000 6.00 0.250
6.00 0.250 1.50 100.00 150.00
06 + 900 6.00 0.250
6.00 0.250 1.50 100.00 150.00
06 + 800 6.00 0.250
6.00 0.250 1.50 100.00 150.00
06 + 700 6.00 0.250
6.00 0.250 1.50 100.00 150.00
06 + 600 6.00 0.250
6.00 0.250 1.50 100.00 150.00
06 + 500 6.00 0.250
6.00 0.250 1.50 100.00 150.00
06 + 400 6.00 0.250
6.00 0.250 1.50 100.00 150.00
06 + 300 6.00 0.250
6.00 0.250 1.50 100.00 150.00
06 + 200 6.00 0.250
6.00 0.250 1.50 100.00 150.00
06 + 100 6.00 0.250
VOLUME 2,835.00
VOLUME LEMBAR SEBELUMNYA 25,552.50
VOLUME SAMPAI LEMBAR INI 28,387.50
VOLUME LAPIS PONDASI ATAS (LPA) 28,387.50

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST RIAN PRIBOWO, ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

1m 3m
LPB
HRS WC
TIMBUNAN PILIHAN LPA

LAPIS PONDASI ATAS (LPA)

LEBAR TEBAL LUAS


LEBAR TEBAL PANJANG VOLUME
STA RATA-RATA RATA-RATA RATA-RATA KET.
(m') (m') (m) (m) (m )
2
(m') (m3)

06 + 100 6.00 0.250


6.00 0.250 1.50 100.00 150.00
06 + 000 6.00 0.250
6.00 0.250 1.50 100.00 150.00
05 + 900 6.00 0.250
6.00 0.250 1.50 90.00 135.00 5+808 Kali (10 M )
05 + 800 6.00 0.250
6.00 0.250 1.50 100.00 150.00
05 + 700 6.00 0.250
6.00 0.250 1.50 100.00 150.00
05 + 600 6.00 0.250
6.00 0.250 1.50 100.00 150.00
05 + 500 6.00 0.250
6.00 0.250 1.50 100.00 150.00
05 + 400 6.00 0.250
6.00 0.250 1.50 100.00 150.00
05 + 300 6.00 0.250
6.00 0.250 1.50 100.00 150.00
05 + 200 6.00 0.250
6.00 0.250 1.50 100.00 150.00
05 + 100 6.00 0.250
6.00 0.250 1.50 100.00 150.00
05 + 000 6.00 0.250
6.00 0.250 1.50 100.00 150.00
04 + 900 6.00 0.250
6.00 0.250 1.50 100.00 150.00
04 + 800 6.00 0.250
6.00 0.250 1.50 100.00 150.00
04 + 700 6.00 0.250
6.00 0.250 1.50 100.00 150.00
04 + 600 6.00 0.250
6.00 0.250 1.50 100.00 150.00
04 + 500 6.00 0.250
6.00 0.250 1.50 100.00 150.00
04 + 400 6.00 0.250
6.00 0.250 1.50 100.00 150.00
04 + 300 6.00 0.250
6.00 0.250 1.50 100.00 150.00
04 + 200 6.00 0.250
VOLUME 2,835.00
VOLUME LEMBAR SEBELUMNYA 28,387.50
VOLUME SAMPAI LEMBAR INI 31,222.50
VOLUME LAPIS PONDASI ATAS (LPA) 31,222.50

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST RIAN PRIBOWO, ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

1m 3m
LPB
HRS WC
TIMBUNAN PILIHAN LPA

LAPIS PONDASI ATAS (LPA)

LEBAR TEBAL LUAS


LEBAR TEBAL PANJANG VOLUME
STA RATA-RATA RATA-RATA RATA-RATA KET.
(m') (m') (m) (m) (m )
2
(m') (m3)

04 + 200 6.00 0.250


6.00 0.250 1.50 100.00 150.00
04 + 100 6.00 0.250
6.00 0.250 1.50 100.00 150.00
04 + 000 6.00 0.250
6.00 0.250 1.50 100.00 150.00
03 + 900 6.00 0.250
6.00 0.250 1.50 100.00 150.00
03 + 800 6.00 0.250
6.00 0.250 1.50 100.00 150.00
03 + 700 6.00 0.250
6.00 0.250 1.50 100.00 150.00
03 + 600 6.00 0.250
6.00 0.250 1.50 100.00 150.00
03 + 500 6.00 0.250
6.00 0.250 1.50 100.00 150.00
03 + 400 6.00 0.250
6.00 0.250 1.50 100.00 150.00
03 + 300 6.00 0.250
6.00 0.250 1.50 100.00 150.00
03 + 200 6.00 0.250
6.00 0.250 1.50 100.00 150.00
03 + 100 6.00 0.250
6.00 0.250 1.50 100.00 150.00
03 + 000 6.00 0.250
6.00 0.250 1.50 100.00 150.00
02 + 900 6.00 0.250
6.00 0.250 1.50 100.00 150.00
02 + 800 6.00 0.250
6.00 0.250 1.50 100.00 150.00
02 + 700 6.00 0.250
6.00 0.250 1.50 100.00 150.00
02 + 600 6.00 0.250
6.00 0.250 1.50 100.00 150.00
02 + 500 6.00 0.250
6.00 0.250 1.50 100.00 150.00
02 + 400 6.00 0.250
6.00 0.250 1.50 100.00 150.00
02 + 300 6.00 0.250
VOLUME 2,850.00
VOLUME LEMBAR SEBELUMNYA 31,222.50
VOLUME SAMPAI LEMBAR INI 34,072.50
VOLUME LAPIS PONDASI ATAS (LPA) 34,072.50

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST RIAN PRIBOWO, ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

1m 3m
LPB
HRS WC
TIMBUNAN PILIHAN LPA

LAPIS PONDASI ATAS (LPA)

LEBAR TEBAL LUAS


LEBAR TEBAL PANJANG VOLUME
STA RATA-RATA RATA-RATA RATA-RATA KET.
(m') (m') (m) (m) (m )
2
(m') (m3)

02 + 300 6.00 0.250


6.00 0.250 1.50 100.00 150.00
02 + 200 6.00 0.250
6.00 0.250 1.50 100.00 150.00
02 + 100 6.00 0.250
6.00 0.250 1.50 100.00 150.00
02 + 000 6.00 0.250
6.00 0.250 1.50 100.00 150.00
01 + 900 6.00 0.250
6.00 0.250 1.50 100.00 150.00
01 + 800 6.00 0.250
6.00 0.250 1.50 100.00 150.00
01 + 700 6.00 0.250
6.00 0.250 1.50 100.00 150.00
01 + 600 6.00 0.250
6.00 0.250 1.50 100.00 150.00
01 + 500 6.00 0.250
6.00 0.250 1.50 100.00 150.00
01 + 400 6.00 0.250
6.00 0.250 1.50 100.00 150.00
01 + 300 6.00 0.250
6.00 0.250 1.50 100.00 150.00
01 + 200 6.00 0.250
6.00 0.250 1.50 100.00 150.00
01 + 100 6.00 0.250
6.00 0.250 1.50 90.00 135.00 1+001 Kali (10 M)
01 + 000 6.00 0.250
6.00 0.250 1.50 100.00 150.00
00 + 900 6.00 0.250
6.00 0.250 1.50 100.00 150.00
00 + 800 6.00 0.250
6.00 0.250 1.50 100.00 150.00
00 + 700 6.00 0.250
6.00 0.250 1.50 100.00 150.00
00 + 600 6.00 0.250
6.00 0.250 1.50 100.00 150.00
00 + 500 6.00 0.250
6.00 0.250 1.50 100.00 150.00
00 + 400 6.00
VOLUME 2,835.00
VOLUME LEMBAR SEBELUMNYA 34,072.50
VOLUME SAMPAI LEMBAR INI 36,907.50
VOLUME LAPIS PONDASI ATAS (LPA) 36,907.50

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST RIAN PRIBOWO, ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
SITE MANAGER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

1m 3m
LPB
HRS WC
TIMBUNAN PILIHAN LPA

LAPIS PONDASI ATAS (LPA)

LEBAR TEBAL LUAS


LEBAR TEBAL PANJANG VOLUME
STA RATA-RATA RATA-RATA RATA-RATA KET.
(m') (m') (m) (m) (m )
2
(m') (m3)

00 + 400 6.00 0.250


6.00 0.250 1.50 100.00 150.00
00 + 300 6.00 0.250
6.00 0.250 1.50 100.00 150.00
00 + 200 6.00 0.250
6.00 0.250 1.50 100.00 150.00
00 + 100 6.00 0.250
6.00 0.250 1.50 100.00 150.00
00 + 000 6.00 0.250
6.00 0.250 1.50 95.00 142.50
00 + 095 6.00

VOLUME 742.50
VOLUME LEMBAR SEBELUMNYA 36,907.50
VOLUME SAMPAI LEMBAR INI 37,650.00
VOLUME LAPIS PONDASI ATAS (LPA) 37,650.00

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST RIAN PRIBOWO, ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

9m

6m

LAPIS RESAP PENGIKAT - ASPAL CAIR

LEBAR KADAR
LEBAR PANJANG VOLUME
STA RATA-RATA ASPAL KET.
(m') (m') (m') (LITER/M2) (m2)

25 + 100 6.00
6.00 100.00 0.70 420.00
25 + 000 6.00
6.00 100.00 0.70 420.00
24 + 900 6.00
6.00 100.00 0.70 420.00
24 + 800 6.00
6.00 100.00 0.70 420.00
24 + 700 6.00
6.00 100.00 0.70 420.00
24 + 600 6.00
6.00 100.00 0.70 420.00
24 + 500 0.00
6.00 100.00 0.70 420.00
24 + 400 6.00
6.00 100.00 0.70 420.00
24 + 300 6.00
6.00 100.00 0.70 420.00
24 + 200 6.00
6.00 100.00 0.70 420.00
24 + 100 6.00
6.00 85.00 0.70 357.00 24+059 Kali Semen (15 M)
24 + 000 6.00
6.00 100.00 0.70 420.00
23 + 900 6.00
6.00 100.00 0.70 420.00
23 + 800 6.00
6.00 100.00 0.70 420.00
23 + 700 6.00
6.00 100.00 0.70 420.00
23 + 600 6.00
6.00 100.00 0.70 420.00
23 + 500 6.00
6.00 100.00 0.70 420.00
23 + 400 6.00
6.00 100.00 0.70 420.00
23 + 300 6.00 23+200 Jembatan (10 M)
6.00 90.00 0.70 378.00
23 + 200 6.00
VOLUME 7875.00
VOLUME LEMBAR SEBELUMNYA 0.00
VOLUME SAMPAI LEMBAR INI 7875.00
VOLUME LAPIS RESAP PENGIKAT - ASPAL CAIR 7875.00

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST RYAN PRIBOWO . ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

9m

6m

LAPIS RESAP PENGIKAT - ASPAL CAIR

LEBAR KADAR
LEBAR PANJANG VOLUME
STA RATA-RATA ASPAL KET.
(m') (m') (m') (LITER/M2) (m2)

23 + 100 6.00
6.00 100.00 0.70 420.00
23 + 000 6.00
6.00 100.00 0.70 420.00
22 + 900 6.00
6.00 100.00 0.70 420.00
22 + 800 6.00
6.00 100.00 0.70 420.00
22 + 700 6.00
6.00 100.00 0.70 420.00
22 + 600 6.00
6.00 100.00 0.70 420.00
22 + 500 0.00
6.00 100.00 0.70 420.00
22 + 400 6.00
6.00 100.00 0.70 420.00
22 + 300 6.00
6.00 100.00 0.70 420.00
22 + 200 6.00
6.00 100.00 0.70 420.00
22 + 100 6.00
6.00 100.00 0.70 420.00
22 + 000 6.00
6.00 100.00 0.70 420.00
21 + 900 6.00
6.00 100.00 0.70 420.00
21 + 800 6.00
6.00 100.00 0.70 420.00
21 + 700 6.00
6.00 100.00 0.70 420.00
21 + 600 6.00
6.00 100.00 0.70 420.00
21 + 500 6.00
6.00 100.00 0.70 420.00
21 + 400 6.00
6.00 100.00 0.70 420.00
21 + 300 6.00
6.00 100.00 0.70 420.00
21 + 200 6.00
VOLUME 7980.00
VOLUME LEMBAR SEBELUMNYA 7875.00
VOLUME SAMPAI LEMBAR INI 15855.00
VOLUME LAPIS RESAP PENGIKAT - ASPAL CAIR 15855.00

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST RYAN PRIBOWO. ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MENEGER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

9m

6m

LAPIS RESAP PENGIKAT - ASPAL CAIR

LEBAR KADAR
LEBAR PANJANG VOLUME
STA RATA-RATA ASPAL KET.
(m') (m') (m') (LITER/M2) (m2)

21 + 200 6.00
6.00 100.00 0.70 420.00
21 + 100 6.00
6.00 100.00 0.70 420.00
21 + 000 6.00
6.00 100.00 0.70 420.00
20 + 900 6.00
6.00 100.00 0.70 420.00
20 + 800 6.00
6.00 100.00 0.70 420.00
20 + 700 6.00
6.00 100.00 0.70 420.00
20 + 600 0.00
6.00 100.00 0.70 420.00
20 + 500 6.00
6.00 100.00 0.70 420.00
20 + 400 6.00
6.00 100.00 0.70 420.00
20 + 300 6.00
6.00 100.00 0.70 420.00
20 + 200 6.00
6.00 100.00 0.70 420.00
20 + 100 6.00
6.00 100.00 0.70 420.00
20 + 000 6.00
6.00 100.00 0.70 420.00
19 + 900 6.00
6.00 100.00 0.70 420.00
19 + 800 6.00
6.00 100.00 0.70 420.00
19 + 700 6.00
6.00 100.00 0.70 420.00
19 + 600 6.00
6.00 100.00 0.70 420.00
19 + 500 6.00
6.00 100.00 0.70 420.00
19 + 400 6.00
6.00 100.00 0.70 420.00
19 + 300 6.00
VOLUME 7980.00
VOLUME LEMBAR SEBELUMNYA 15855.00
VOLUME SAMPAI LEMBAR INI 23835.00
VOLUME LAPIS RESAP PENGIKAT - ASPAL CAIR 23835.00

DI PERIKSA:
DISETUJUI KONSULTAN DIBUAT :
KOORDINATOR PENGAWAS LAPANGAN PT. YODYA KARYA (PERSERO) PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. DHARMA ABADI CONSULTAN. JO PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA)

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST RYAN PRIBOWO. ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

9m

6m

LAPIS RESAP PENGIKAT - ASPAL CAIR

LEBAR KADAR
LEBAR PANJANG VOLUME
STA RATA-RATA ASPAL KET.
(m') (m') (m') (LITER/M2) (m2)

19 + 300 6.00
6.00 100.00 0.70 420.00
19 + 200 6.00
6.00 100.00 0.70 420.00
19 + 100 6.00
6.00 100.00 0.70 420.00
19 + 000 6.00
6.00 100.00 0.70 420.00
18 + 900 6.00
6.00 100.00 0.70 420.00
18 + 800 6.00
6.00 100.00 0.70 420.00
18 + 700 0.00
6.00 100.00 0.70 420.00
18 + 600 6.00
6.00 100.00 0.70 420.00
18 + 500 6.00
6.00 100.00 0.70 420.00
18 + 400 6.00
6.00 100.00 0.70 420.00
18 + 300 6.00
6.00 100.00 0.70 420.00
18 + 200 6.00
6.00 100.00 0.70 420.00
18 + 100 6.00
6.00 100.00 0.70 420.00
18 + 000 6.00
6.00 100.00 0.70 420.00
17 + 900 6.00
6.00 100.00 0.70 420.00
17 + 800 6.00
6.00 100.00 0.70 420.00
17 + 700 6.00
6.00 100.00 0.70 420.00
17 + 600 6.00
6.00 100.00 0.70 420.00
17 + 500 6.00
6.00 100.00 0.70 420.00
17 + 400 6.00
VOLUME 7980.00
VOLUME LEMBAR SEBELUMNYA 23835.00
VOLUME SAMPAI LEMBAR INI 31815.00
VOLUME LAPIS RESAP PENGIKAT - ASPAL CAIR 31815.00

DI PERIKSA: DIBUAT :
DISETUJUI KONSULTAN
KOORDINATOR PENGAWAS LAPANGAN PENYEDIA JASA
PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
PEJABAT PEMBUAT KOMITMEN V.1 PT. DHARMA ABADI CONSULTAN. JO
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA)

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST


NIP : 19891226 201012 1 004 RYAN PRIBOWO. ST
QUANTITY ENGINEER SITE MANAGER
SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST
NIP : 19891226 201012 1 004 RYAN PRIBOWO. ST
QUANTITY ENGINEER SITE MANAGER

BACK UP DATA MC "0"


PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

9m

6m

LAPIS RESAP PENGIKAT - ASPAL CAIR

LEBAR KADAR
LEBAR PANJANG VOLUME
STA RATA-RATA ASPAL KET.
(m') (m') (m') (LITER/M2) (m2)

17 + 400 6.00
6.00 100.00 0.70 420.00
17 + 300 6.00
6.00 100.00 0.70 420.00
17 + 200 6.00
6.00 100.00 0.70 420.00
17 + 100 6.00
6.00 100.00 0.70 420.00
17 + 000 6.00
6.00 100.00 0.70 420.00
16 + 900 6.00
6.00 100.00 0.70 420.00
16 + 800 0.00
6.00 100.00 0.70 420.00
16 + 700 6.00
6.00 100.00 0.70 420.00
16 + 600 6.00
6.00 100.00 0.70 420.00
16 + 500 6.00
6.00 100.00 0.70 420.00
16 + 400 6.00
6.00 100.00 0.70 420.00
16 + 300 6.00
6.00 100.00 0.70 420.00
16 + 200 6.00
6.00 100.00 0.70 420.00
16 + 100 6.00
6.00 100.00 0.70 420.00
16 + 000 6.00
6.00 100.00 0.70 420.00
15 + 900 6.00
6.00 100.00 0.70 420.00
15 + 800 6.00
6.00 100.00 0.70 420.00
15 + 700 6.00
6.00 100.00 0.70 420.00
15 + 600 6.00
6.00 100.00 0.70 420.00
15 + 500 6.00
VOLUME 7980.00
VOLUME LEMBAR SEBELUMNYA 31815.00
VOLUME SAMPAI LEMBAR INI 39795.00
VOLUME LAPIS RESAP PENGIKAT - ASPAL CAIR 39795.00

DI PERIKSA:
DISETUJUI KONSULTAN DIBUAT :
KOORDINATOR PENGAWAS LAPANGAN PT. YODYA KARYA (PERSERO) PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. DHARMA ABADI CONSULTAN. JO PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA)

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST RYAN PRIBOWO. ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

9m

6m

LAPIS RESAP PENGIKAT - ASPAL CAIR

LEBAR KADAR
LEBAR PANJANG VOLUME
STA RATA-RATA ASPAL KET.
(m') (m') (m') (LITER/M2) (m2)

15 + 500 6.00
6.00 100.00 0.70 420.00
15 + 400 6.00
6.00 100.00 0.70 420.00
15 + 300 6.00
6.00 100.00 0.70 420.00
15 + 200 6.00
6.00 100.00 0.70 420.00
15 + 100 6.00
6.00 100.00 0.70 420.00
15 + 000 6.00
6.00 100.00 0.70 420.00
14 + 900 0.00
6.00 100.00 0.70 420.00
14 + 800 6.00
6.00 90.00 0.70 378.00 14+735 Jembatan (10 M)
14 + 700 6.00
6.00 100.00 0.70 420.00
14 + 600 6.00
6.00 100.00 0.70 420.00
14 + 500 6.00
6.00 100.00 0.70 420.00
14 + 400 6.00
6.00 100.00 0.70 420.00
14 + 300 6.00
6.00 100.00 0.70 420.00
14 + 200 6.00
6.00 100.00 0.70 420.00
14 + 100 6.00
6.00 100.00 0.70 420.00
14 + 000 6.00
6.00 100.00 0.70 420.00
13 + 900 6.00
6.00 80.00 0.70 336.00 13+800 Jembatan Gurage(20 M)
13 + 800 6.00
6.00 100.00 0.70 420.00
13 + 700 6.00
6.00 100.00 0.70 420.00
13 + 600 6.00
VOLUME 7854.00
VOLUME LEMBAR SEBELUMNYA 39795.00
VOLUME SAMPAI LEMBAR INI 47649.00
VOLUME LAPIS RESAP PENGIKAT - ASPAL CAIR 47649.00

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST RYAN PRIBOWO. ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

9m

6m

LAPIS RESAP PENGIKAT - ASPAL CAIR

LEBAR KADAR
LEBAR PANJANG VOLUME
STA RATA-RATA ASPAL KET.
(m') (m') (m') (LITER/M2) (m2)

13 + 600 6.00
6.00 100.00 0.70 420.00
13 + 500 6.00
6.00 100.00 0.70 420.00
13 + 400 6.00
6.00 100.00 0.70 420.00
13 + 300 6.00
6.00 100.00 0.70 420.00
13 + 200 6.00
6.00 100.00 0.70 420.00
13 + 100 6.00
6.00 100.00 0.70 420.00
13 + 000 0.00
6.00 100.00 0.70 420.00
12 + 900 6.00
6.00 100.00 0.70 420.00
12 + 800 6.00
6.00 100.00 0.70 420.00
12 + 700 6.00
6.00 100.00 0.70 420.00
12 + 600 6.00
6.00 100.00 0.70 420.00
12 + 500 6.00
6.00 100.00 0.70 420.00
12 + 400 6.00
6.00 100.00 0.70 420.00
12 + 300 6.00
6.00 100.00 0.70 420.00
12 + 200 6.00
6.00 100.00 0.70 420.00
12 + 100 6.00
6.00 100.00 0.70 420.00
12 + 000 6.00
6.00 100.00 0.70 420.00
11 + 900 6.00
6.00 100.00 0.70 420.00
11 + 800 6.00
6.00 100.00 0.70 420.00
11 + 700 6.00
VOLUME 7980.00
VOLUME LEMBAR SEBELUMNYA 47649.00
VOLUME SAMPAI LEMBAR INI 55629.00
VOLUME LAPIS RESAP PENGIKAT - ASPAL CAIR 55629.00

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST RYAN PRIBOWO. ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

9m

6m

LAPIS RESAP PENGIKAT - ASPAL CAIR

LEBAR KADAR
LEBAR PANJANG VOLUME
STA RATA-RATA ASPAL KET.
(m') (m') (m') (LITER/M2) (m2)

11 + 700 6.00
6.00 100.00 0.70 420.00
11 + 600 6.00
6.00 100.00 0.70 420.00
11 + 500 6.00
6.00 100.00 0.70 420.00
11 + 400 6.00
6.00 100.00 0.70 420.00
11 + 300 6.00
6.00 100.00 0.70 420.00
11 + 200 6.00
6.00 100.00 0.70 420.00
11 + 100 0.00
6.00 100.00 0.70 420.00
11 + 000 6.00
6.00 100.00 0.70 420.00
10 + 900 6.00
6.00 100.00 0.70 420.00
10 + 800 6.00
6.00 100.00 0.70 420.00
10 + 700 6.00
6.00 100.00 0.70 420.00
10 + 600 6.00
6.00 100.00 0.70 420.00
10 + 500 6.00
6.00 100.00 0.70 420.00
10 + 400 6.00
6.00 100.00 0.70 420.00
10 + 300 6.00
6.00 100.00 0.70 420.00
10 + 200 6.00
6.00 100.00 0.70 420.00
10 + 100 6.00
6.00 100.00 0.70 420.00
10 + 000 6.00
6.00 100.00 0.70 420.00
09 + 900 6.00
6.00 100.00 0.70 420.00
09 + 800 6.00
VOLUME 7980.00
VOLUME LEMBAR SEBELUMNYA 55629.00
VOLUME SAMPAI LEMBAR INI 63609.00
VOLUME LAPIS RESAP PENGIKAT - ASPAL CAIR 63609.00

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST RYAN PRIBOWO. ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

9m

6m

LAPIS RESAP PENGIKAT - ASPAL CAIR

LEBAR KADAR
LEBAR PANJANG VOLUME
STA RATA-RATA ASPAL KET.
(m') (m') (m') (LITER/M2) (m2)

09 + 800 6.00
6.00 100.00 0.70 420.00
09 + 700 6.00
6.00 90.00 0.70 378.00 9+650 Jembatan (10 M)
09 + 600 6.00
6.00 100.00 0.70 420.00
09 + 500 6.00
6.00 100.00 0.70 420.00
09 + 400 6.00
6.00 100.00 0.70 420.00
09 + 300 6.00
6.00 100.00 0.70 420.00
09 + 200 0.00
6.00 100.00 0.70 420.00
09 + 100 6.00
6.00 100.00 0.70 420.00
09 + 000 6.00
6.00 100.00 0.70 420.00
08 + 900 6.00
6.00 100.00 0.70 420.00
08 + 800 6.00
6.00 100.00 0.70 420.00
08 + 700 6.00
6.00 100.00 0.70 420.00
08 + 600 6.00
6.00 100.00 0.70 420.00
08 + 500 6.00
6.00 100.00 0.70 420.00
08 + 400 6.00
6.00 100.00 0.70 420.00
08 + 300 6.00
6.00 100.00 0.70 420.00
08 + 200 6.00
6.00 100.00 0.70 420.00
08 + 100 6.00
6.00 100.00 0.70 420.00
08 + 000 6.00
6.00 90.00 0.70 378.00 7+910 Jembatan (10 M)
07 + 900 6.00
VOLUME 7896.00
VOLUME LEMBAR SEBELUMNYA 63609.00
VOLUME SAMPAI LEMBAR INI 71505.00
VOLUME LAPIS RESAP PENGIKAT - ASPAL CAIR 71505.00

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST RYAN PRIBOWO. ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

9m

6m

LAPIS RESAP PENGIKAT - ASPAL CAIR

LEBAR KADAR
LEBAR PANJANG VOLUME
STA RATA-RATA ASPAL KET.
(m') (m') (m') (LITER/M2) (m2)

07 + 900 6.00
6.00 100.00 0.70 420.00
07 + 800 6.00
6.00 100.00 0.70 420.00
07 + 700 6.00
6.00 100.00 0.70 420.00
07 + 600 6.00
6.00 100.00 0.70 420.00
07 + 500 6.00
6.00 100.00 0.70 420.00
07 + 400 6.00
6.00 100.00 0.70 420.00
07 + 300 0.00
6.00 100.00 0.70 420.00
07 + 200 6.00
6.00 100.00 0.70 420.00
07 + 100 6.00
6.00 100.00 0.70 420.00
07 + 000 6.00
6.00 100.00 0.70 420.00
06 + 900 6.00
6.00 100.00 0.70 420.00
06 + 800 6.00
6.00 100.00 0.70 420.00
06 + 700 6.00
6.00 100.00 0.70 420.00
06 + 600 6.00
6.00 100.00 0.70 420.00
06 + 500 6.00
6.00 100.00 0.70 420.00
06 + 400 6.00
6.00 100.00 0.70 420.00
06 + 300 6.00
6.00 100.00 0.70 420.00
06 + 200 6.00
6.00 100.00 0.70 420.00
06 + 100 6.00
6.00 100.00 0.70 420.00
06 + 000 6.00
VOLUME 7980.00
VOLUME LEMBAR SEBELUMNYA 71505.00
VOLUME SAMPAI LEMBAR INI 79485.00
VOLUME LAPIS RESAP PENGIKAT - ASPAL CAIR 79485.00

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST RYAN PRIBOWO. ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

9m

6m

LAPIS RESAP PENGIKAT - ASPAL CAIR

LEBAR KADAR
LEBAR PANJANG VOLUME
STA RATA-RATA ASPAL KET.
(m') (m') (m') (LITER/M2) (m2)

06 + 000 6.00
6.00 100.00 0.70 420.00
05 + 900 6.00
6.00 90.00 0.70 378.00 5+808 Kali (10 M )
05 + 800 6.00
6.00 100.00 0.70 420.00
05 + 700 6.00
6.00 100.00 0.70 420.00
05 + 600 6.00
6.00 100.00 0.70 420.00
05 + 500 6.00
6.00 100.00 0.70 420.00
05 + 400 0.00
6.00 100.00 0.70 420.00
05 + 300 6.00
6.00 100.00 0.70 420.00
05 + 200 6.00
6.00 100.00 0.70 420.00
05 + 100 6.00
6.00 100.00 0.70 420.00
05 + 000 6.00
6.00 100.00 0.70 420.00
04 + 900 6.00
6.00 100.00 0.70 420.00
04 + 800 6.00
6.00 100.00 0.70 420.00
04 + 700 6.00
6.00 100.00 0.70 420.00
04 + 600 6.00
6.00 100.00 0.70 420.00
04 + 500 6.00
6.00 100.00 0.70 420.00
04 + 400 6.00
6.00 100.00 0.70 420.00
04 + 300 6.00
6.00 100.00 0.70 420.00
04 + 200 6.00
6.00 100.00 0.70 420.00
04 + 100 6.00
VOLUME 7938.00
VOLUME LEMBAR SEBELUMNYA 79485.00
VOLUME SAMPAI LEMBAR INI 87423.00
VOLUME LAPIS RESAP PENGIKAT - ASPAL CAIR 87423.00

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST RYAN PRIBOWO. ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

9m

6m

LAPIS RESAP PENGIKAT - ASPAL CAIR

LEBAR KADAR
LEBAR PANJANG VOLUME
STA RATA-RATA ASPAL KET.
(m') (m') (m') (LITER/M2) (m2)

04 + 100 6.00
6.00 100.00 0.70 420.00
04 + 000 6.00
6.00 100.00 0.70 420.00
03 + 900 6.00
6.00 100.00 0.70 420.00
03 + 800 6.00
6.00 100.00 0.70 420.00
03 + 700 6.00
6.00 100.00 0.70 420.00
03 + 600 6.00
6.00 100.00 0.70 420.00
03 + 500 0.00
6.00 100.00 0.70 420.00
03 + 400 6.00
6.00 100.00 0.70 420.00
03 + 300 6.00
6.00 100.00 0.70 420.00
03 + 200 6.00
6.00 100.00 0.70 420.00
03 + 100 6.00
6.00 100.00 0.70 420.00
03 + 000 6.00
6.00 100.00 0.70 420.00
02 + 900 6.00
6.00 100.00 0.70 420.00
02 + 800 6.00
6.00 100.00 0.70 420.00
02 + 700 6.00
6.00 100.00 0.70 420.00
02 + 600 6.00
6.00 100.00 0.70 420.00
02 + 500 6.00
6.00 100.00 0.70 420.00
02 + 400 6.00
6.00 100.00 0.70 420.00
02 + 300 6.00
6.00 100.00 0.70 420.00
02 + 200 6.00
VOLUME 7980.00
VOLUME LEMBAR SEBELUMNYA 87423.00
VOLUME SAMPAI LEMBAR INI 95403.00
VOLUME LAPIS RESAP PENGIKAT - ASPAL CAIR 95403.00

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST RYAN PRIBOWO. ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

9m

6 m

LAPIS RESAP PENGIKAT - ASPAL CAIR

LEBAR KADAR
LEBAR PANJANG VOLUME
STA RATA-RATA ASPAL KET.
(m') (m') (m') (LITER/M2) (m2)

02 + 200 6.00
6.00 100.00 0.70 420.00
02 + 100 6.00
6.00 100.00 0.70 420.00
02 + 000 6.00
6.00 100.00 0.70 420.00
01 + 900 6.00
6.00 100.00 0.70 420.00
01 + 800 6.00
6.00 100.00 0.70 420.00
01 + 700 6.00
6.00 100.00 0.70 420.00
01 + 600 0.00
6.00 100.00 0.70 420.00
01 + 500 6.00
6.00 100.00 0.70 420.00
01 + 400 6.00
6.00 100.00 0.70 420.00
01 + 300 6.00
6.00 100.00 0.70 420.00
01 + 200 6.00
6.00 100.00 0.70 420.00
01 + 100 6.00
6.00 90.00 0.70 378.00 1+001 Kali (10 M)
01 + 000 6.00
6.00 100.00 0.70 420.00
00 + 900 6.00
6.00 100.00 0.70 420.00
00 + 800 6.00
6.00 100.00 0.70 420.00
00 + 700 6.00
6.00 100.00 0.70 420.00
00 + 600 6.00
6.00 100.00 0.70 420.00
00 + 500 6.00
6.00 100.00 0.70 420.00
00 + 400 6.00
6.00 100.00 0.70 420.00
00 + 300 6.00
VOLUME 7938.00
VOLUME LEMBAR SEBELUMNYA 95403.00
VOLUME SAMPAI LEMBAR INI 103341.00
VOLUME LAPIS RESAP PENGIKAT - ASPAL CAIR 103341.00

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST RYAN PRIBOWO. ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

9 m

6 m

LAPIS RESAP PENGIKAT - ASPAL CAIR

LEBAR KADAR
LEBAR PANJANG VOLUME
STA RATA-RATA ASPAL KET.
(m') (m') (m') (LITER/M2) (m2)

00 + 300 6.00
6.00 100.00 0.70 420.00
00 + 200 6.00
6.00 100.00 0.70 420.00
00 + 100 6.00
6.00 100.00 0.70 420.00
00 + 000 6.00
6.00 100.00 0.70 420.00
00 + 095 6.00
6.00 95.00 0.70 399.00

VOLUME 2079.00
VOLUME LEMBAR SEBELUMNYA 103341.00
VOLUME SAMPAI LEMBAR INI 105420.00
VOLUME LAPIS RESAP PENGIKAT - ASPAL CAIR 105420.00

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST RYAN PRIBOWO. ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
1,870.00
0.00
1,870.00
1,900.00
1,870.00
3,770.00
1,900.00

3,770.00
5,670.00

1,880.00
5,670.00
7,550.00
1,890.00
7,550.00
9,440.00
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019
1m 3m

LPB
HRS WC
TIMBUNAN PILIHAN LPA

Lataston Lapis Aus (HRS-WC) (Gradasi Senjang/Semi Senjang)

LEBAR TEBAL LUAS 17093.1


LEBAR TEBAL PANJANG BERAT VOLUME BAHANANTI PENGELUPAS
STA RATA-RATA RATA-RATA RATA-RATA KET. 3261.38
(m') (m') (m) (m) (m )
2
(m') (TON M3) (m )
3

0.190800966
25 + 100 6.00 0.050
6.00 0.050 0.30 100.00 2.27 68.10 12.99
25 + 000 6.00 0.050 - -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
24 + 900 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
24 + 800 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
24 + 700 6.00 0.050
6.00 0.050 0.30 100.00 2.27 68.10 12.99
24 + 600 6.00 0.050
6.00 0.050 0.30 100.00 2.27 68.10 12.99
24 + 500 6.00 0.050
6.00 0.050 0.30 100.00 2.27 68.10 12.99
24 + 400 6.00 0.050
6.00 0.050 0.30 100.00 2.27 68.10 12.99
24 + 300 6.00 0.050
6.00 0.050 0.30 100.00 2.27 68.10 12.99
24 + 200 6.00 0.050
6.00 0.050 0.30 100.00 2.27 68.10 12.99
24 + 100 6.00 0.050
6.00 0.050 0.30 85.00 2.27 57.89 11.04 24+059 Kali Semen (15 M)
24 + 000 6.00 0.050
6.00 0.050 0.30 100.00 2.27 68.10 12.99
23 + 900 6.00 0.050
6.00 0.050 0.30 100.00 2.27 68.10 12.99
23 + 800 6.00 0.050
6.00 0.050 0.30 100.00 2.27 68.10 12.99
23 + 700 6.00 0.050
6.00 0.050 0.30 100.00 2.27 68.10 12.99
23 + 600 6.00 0.050
6.00 0.050 0.30 100.00 2.27 68.10 12.99
23 + 500 6.00 0.050
6.00 0.050 0.30 100.00 2.27 68.10 12.99
23 + 400 6.00
6.00 0.050 0.30 100.00 2.27 68.10 12.99
23 + 300 6.00 0.050
6.00 0.050 0.30 90.00 2.27 61.29 11.69 23+200 Jembatan (10 M) 1,875.00
23 + 200 6.00 0.050
VOLUME 1,276.88 243.63
VOLUME LEMBAR SEBELUMNYA -
VOLUME SAMPAI LEMBAR INI 1,276.88 243.63
VOLUME LATASTON LAPIS AUS (HRS-WC) (gradasi senjang/semi senjang) 1,276.88 243.63

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST RIAN PRIBOWO, ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
RIAN PRIBOWO, ST
SITE MANAGER

BACK UP DATA MC "0"


PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

1m 3m

LPB
HRS WC
TIMBUNAN PILIHAN LPA

Lataston Lapis Aus (HRS-WC) (Gradasi Senjang/Semi Senjang)

LEBAR TEBAL LUAS


LEBAR TEBAL PANJANG BERAT VOLUME BAHAN ANTI PENGELUPAS
STA RATA-RATA RATA-RATA RATA-RATA KET.
(m') (m') (m) (m) (m2) (m') (TON/M3) (m3)

23 + 200 6.00 0.050


6.00 0.050 0.30 100.00 2.27 68.10 12.99
23 + 100 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
23 + 000 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
22 + 900 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
22 + 800 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
22 + 700 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
22 + 600 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
22 + 500 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
22 + 400 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
22 + 300 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
22 + 200 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
22 + 100 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
22 + 000 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
21 + 900 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
21 + 800 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
21 + 700 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
21 + 600 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
21 + 500 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
21 + 400 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
21 + 300 6.00 0.050 1,900.00
VOLUME 1,293.90 246.88 1,875.00
VOLUME LEMBAR SEBELUMNYA 1,276.88 243.63
VOLUME SAMPAI LEMBAR INI 2,570.78 490.51 3,775.00
VOLUME LATASTON LAPIS AUS (HRS-WC) (gradasi senjang/semi senjang) 2,570.78 490.51

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST RIAN PRIBOWO, ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
RIZAL SARIB, ST RIAN PRIBOWO, ST
QUANTITY ENGINEER SITE MANAGER

BACK UP DATA MC "0"


PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

1m 3m

LPB
HRS WC
TIMBUNAN PILIHAN LPA

Lataston Lapis Aus (HRS-WC) (Gradasi Senjang/Semi Senjang)

LEBAR TEBAL LUAS


LEBAR TEBAL PANJANG BERAT VOLUME BAHAN ANTI PENGELUPAS
STA RATA-RATA RATA-RATA RATA-RATA KET.
(m') (m') (m) (m) (m2) (m') (TON/M3) (m3)

21 + 300 6.00 0.050


6.00 0.050 0.30 100.00 2.27 68.10 12.99
21 + 200 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
21 + 100 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
21 + 000 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
20 + 900 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
20 + 800 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
20 + 700 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
20 + 600 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
20 + 500 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
20 + 400 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
20 + 300 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
20 + 200 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
20 + 100 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
20 + 000 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
19 + 900 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
19 + 800 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
19 + 700 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
19 + 600 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
19 + 500 6.00 0.050 - 1,900.00
6.00 0.050 0.30 100.00 2.27 68.10 12.99 3,775.00
19 + 400 6.00 0.050 5,675.00
VOLUME 1,293.90 246.88
VOLUME LEMBAR SEBELUMNYA 2,570.78 490.51
VOLUME SAMPAI LEMBAR INI 3,864.68 737.38
VOLUME LATASTON LAPIS AUS (HRS-WC) (gradasi senjang/semi senjang) 3,864.68 737.38

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST RIAN PRIBOWO, ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
RIAN PRIBOWO, ST
SITE MANAGER

BACK UP DATA MC "0"


PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

Lataston Lapis Aus (HRS-WC) (Gradasi Senjang/Semi Senjang)

LEBAR TEBAL LUAS


LEBAR TEBAL PANJANG BERAT VOLUME BAHAN ANTI PENGELUPAS
STA RATA-RATA RATA-RATA RATA-RATA KET.
(m') (m') (m) (m) (m2) (m') ( TON/M3) (m3)

19 + 400 6.00 0.050


6.00 0.050 0.30 100.00 2.27 68.10 12.99
19 + 300 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
19 + 200 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
19 + 100 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
19 + 000 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
18 + 900 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
18 + 800 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
18 + 700 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
18 + 600 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
18 + 500 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
18 + 400 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
18 + 300 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
18 + 200 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
18 + 100 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
18 + 000 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
17 + 900 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
17 + 800 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
17 + 700 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99 1,900.00
17 + 600 6.00 0.050 - 5,675.00
6.00 0.050 0.30 100.00 2.27 68.10 12.99 7,575.00
17 + 500 6.00 0.050
VOLUME 1,293.90 246.88
VOLUME LEMBAR SEBELUMNYA 3,864.68 737.38
VOLUME SAMPAI LEMBAR INI 5,158.58 984.26
VOLUME LATASTON LAPIS AUS (HRS-WC) (gradasi senjang/semi senjang) 5,158.58 984.26

DIBUAT :
DISETUJUI DI PERIKSA: PENYEDIA JASA
KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PT. MODERN WIDYA TEHNICAL
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO)
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIAN PRIBOWO, ST


RIZAL SARIB, ST SITE MANAGER
NIP : 19891226 201012 1 004 QUANTITY ENGINEER

1 m 3 m

LPB
HRS WC
T IMBUNAN PI LIHAN L PA
RIAN PRIBOWO, ST
RIZAL SARIB, ST SITE MANAGER
QUANTITY ENGINEER

BACK UP DATA MC "0"


1 m 3 m

LPB
HRS WC
T IMBUNAN PI LIHAN L PA

PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)


TAHUN ANGGARAN 2017 - 2019

Lataston Lapis Aus (HRS-WC) (Gradasi Senjang/Semi Senjang)

LEBAR TEBAL LUAS


LEBAR TEBAL PANJANG BERAT VOLUME BAHAN ANTI PENGELUPAS
STA RATA-RATA RATA-RATA RATA-RATA KET.
(m') (m') (m) (m) (m2) (m') (TON/M3) (m3)

17 + 500 6.00 0.050


6.00 0.050 0.30 100.00 2.27 68.10 12.99
17 + 400 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
17 + 300 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
17 + 200 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
17 + 100 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
17 + 000 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
16 + 900 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
16 + 800 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
16 + 700 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
16 + 600 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
16 + 500 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
16 + 400 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
16 + 300 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
16 + 200 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
16 + 100 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
16 + 000 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
15 + 900 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
15 + 800 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
15 + 700 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99 1,900.00
15 + 600 6.00 0.050 7,575.00
VOLUME 1,293.90 246.88 9,475.00
VOLUME LEMBAR SEBELUMNYA 5,158.58 984.26
VOLUME SAMPAI LEMBAR INI 6,452.48 1,231.14
VOLUME LATASTON LAPIS AUS (HRS-WC) (gradasi senjang/semi senjang) 6,452.48 1,231.14

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST RIAN PRIBOWO, ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER

1 m 3 m

LPB
HRS W C
TIMBUNAN PILIHAN L PA
RIZAL SARIB, ST RIAN PRIBOWO, ST
QUANTITY ENGINEER SITE MANAGER

1 m 3 m

BACK UP DATA MC "0"


LPB
HRS W C
TIMBUNAN PILIHAN L PA

PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)


TAHUN ANGGARAN 2017 - 2019

Lataston Lapis Aus (HRS-WC) (Gradasi Senjang/Semi Senjang)

LEBAR TEBAL LUAS


LEBAR TEBAL PANJANG BERAT VOLUME BAHAN ANTI PENGELUPAS
STA RATA-RATA RATA-RATA RATA-RATA KET.
(m') (m') (m) (m) (m2) (m') (TON/M3) (m3)

15 + 600 6.00 0.050


6.00 0.050 0.30 100.00 2.27 68.10 12.99
15 + 500 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
15 + 400 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
15 + 300 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
15 + 200 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
15 + 100 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
15 + 000 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
14 + 900 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
14 + 800 6.00 0.050 -
6.00 0.050 0.30 90.00 2.27 61.29 11.69 14+735 Jembatan (10 M)
14 + 700 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
14 + 600 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
14 + 500 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
14 + 400 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
14 + 300 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
14 + 200 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
14 + 100 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
14 + 000 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
13 + 900 6.00 0.050 -
6.00 0.050 0.30 80.00 2.27 54.48 10.39 13+800 Jembatan Gurage(20 M)
13 + 800 6.00 0.050 - 1,870.00
6.00 0.050 0.30 100.00 2.27 68.10 12.99 9,475.00
13 + 700 6.00 0.050 11,345.00
VOLUME 1,273.47 242.98
VOLUME LEMBAR SEBELUMNYA 6,452.48 1,231.14
VOLUME SAMPAI LEMBAR INI 7,725.95 1,474.12
VOLUME LATASTON LAPIS AUS (HRS-WC) (gradasi senjang/semi senjang) 7,725.95 1,474.12

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST RIAN PRIBOWO, ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
RIZAL SARIB, ST RIAN PRIBOWO, ST
QUANTITY ENGINEER SITE MANAGER

BACK UP DATA MC "0"


PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

Lataston Lapis Aus (HRS-WC) (Gradasi Senjang/Semi Senjang)

LEBAR TEBAL LUAS


LEBAR TEBAL PANJANG BERAT VOLUME BAHAN ANTI PENGELUPAS
STA RATA-RATA RATA-RATA RATA-RATA KET.
(m') (m') (m) (m) (m2) (m') (TON/M3) (m3)

13 + 700 6.00 0.050


6.00 0.050 0.30 100.00 2.27 68.10 12.99
13 + 600 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
13 + 500 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
13 + 400 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
13 + 300 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
13 + 200 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
13 + 100 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
13 + 000 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
12 + 900 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
12 + 800 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
12 + 700 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
12 + 600 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
12 + 500 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
12 + 400 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
12 + 300 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
12 + 200 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
12 + 100 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
12 + 000 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
11 + 900 6.00 0.050 - 1,900.00
6.00 0.050 0.30 100.00 2.27 68.10 12.99 11,345.00
11 + 800 6.00 0.050 13,245.00
VOLUME 1,293.90 246.88
VOLUME LEMBAR SEBELUMNYA 7,725.95 1,474.12
VOLUME SAMPAI LEMBAR INI 9,019.85 1,721.00
VOLUME LATASTON LAPIS AUS (HRS-WC) (gradasi senjang/semi senjang) 9,019.85 1,721.00

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST RIAN PRIBOWO, ST


NIP : 19891226 201012 1 004 QUANTITY ENGGINER SITE MANAGER
RIZAL SARIB, ST RIAN PRIBOWO, ST
QUANTITY ENGGINER SITE MANAGER

BACK UP DATA MC "0"


PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

Lataston Lapis Aus (HRS-WC) (Gradasi Senjang/Semi Senjang)

LEBAR TEBAL LUAS


LEBAR TEBAL PANJANG BERAT VOLUME BAHAN ANTI PENGELUPAS
STA RATA-RATA RATA-RATA RATA-RATA KET.
(m') (m') (m) (m) (m2) (m') (TON/M3) (m3)

11 + 800 6.00 0.050


6.00 0.050 0.30 100.00 2.27 68.10 12.99
11 + 700 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
11 + 600 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
11 + 500 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
11 + 400 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
11 + 300 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
11 + 200 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
11 + 100 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
11 + 000 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
10 + 900 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
10 + 800 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
10 + 700 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
10 + 600 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
10 + 500 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
10 + 400 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
10 + 300 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
10 + 200 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
10 + 100 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
10 + 000 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99 1,900.00
09 + 900 6.00 0.050 13,245.00
VOLUME 1,293.90 246.88 15,145.00
VOLUME LEMBAR SEBELUMNYA 9,019.85 1,721.00
VOLUME SAMPAI LEMBAR INI 10,313.75 1,967.87
VOLUME LATASTON LAPIS AUS (HRS-WC) (gradasi senjang/semi senjang) 10,313.75 1,967.87

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST RIAN PRIBOWO, ST


NIP : 19891226 201012 1 004 QUANTITY ENGGINER SITE MANAGER
RIZAL SARIB, ST RIAN PRIBOWO, ST
QUANTITY ENGGINER SITE MANAGER

BACK UP DATA MC "0"


PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

Lataston Lapis Aus (HRS-WC) (Gradasi Senjang/Semi Senjang)

LEBAR TEBAL LUAS


LEBAR TEBAL PANJANG BERAT VOLUME BAHAN ANTI PENGELUPAS
STA RATA-RATA RATA-RATA RATA-RATA KET.
(m') (m') (m) (m) (m2) (m') (TON/M3) (m3)

09 + 900 6.00 0.050


6.00 0.050 0.30 100.00 2.27 68.10 12.99
09 + 800 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
09 + 700 6.00 0.050 -
6.00 0.050 0.30 90.00 2.27 61.29 11.69 9+650 Jembatan (10 M)
09 + 600 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
09 + 500 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
09 + 400 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
09 + 300 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
09 + 200 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
09 + 100 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
09 + 000 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
08 + 900 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
08 + 800 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
08 + 700 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
08 + 600 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
08 + 500 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
08 + 400 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
08 + 300 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
08 + 200 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
08 + 100 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
08 + 000 6.00 0.050
VOLUME 1,287.09 245.58
VOLUME LEMBAR SEBELUMNYA 10,313.75 1,967.87
VOLUME SAMPAI LEMBAR INI 11,600.84 2,213.45
VOLUME LATASTON LAPIS AUS (HRS-WC) (gradasi senjang/semi senjang) 11,600.84 2,213.45

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST RIAN PRIBOWO, ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
RIZAL SARIB, ST RIAN PRIBOWO, ST
QUANTITY ENGINEER SITE MANAGER

BACK UP DATA MC "0"


PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

Lataston Lapis Aus (HRS-WC) (Gradasi Senjang/Semi Senjang)

LEBAR TEBAL LUAS


LEBAR TEBAL PANJANG BERAT VOLUME BAHAN ANTI PENGELUPAS
STA RATA-RATA RATA-RATA RATA-RATA KET.
(m') (m') (m) (m) (m2) (m') (TON/M3) (m3)

08 + 000 6.00 0.050


6.00 0.050 0.30 90.00 2.27 61.29 11.69 7+910 Jembatan (10 M)
07 + 900 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
07 + 800 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
07 + 700 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
07 + 600 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
07 + 500 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
07 + 400 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
07 + 300 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
07 + 200 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
07 + 100 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
07 + 000 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
06 + 900 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
06 + 800 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
06 + 700 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
06 + 600 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
06 + 500 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
06 + 400 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
06 + 300 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
06 + 200 6.00 0.050 - 1,890.00
6.00 0.050 0.30 100.00 2.27 68.10 12.99 -
06 + 100 6.00 0.050 1,890.00
VOLUME 1,287.09 245.58
VOLUME LEMBAR SEBELUMNYA 11,600.84 2,213.45
VOLUME SAMPAI LEMBAR INI 12,887.93 2,459.03
VOLUME LATASTON LAPIS AUS (HRS-WC) (gradasi senjang/semi senjang) 12,887.93 2,459.03

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST RIAN PRIBOWO, ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
RIZAL SARIB, ST RIAN PRIBOWO, ST
QUANTITY ENGINEER SITE MANAGER

BACK UP DATA MC "0"


PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

Lataston Lapis Aus (HRS-WC) (Gradasi Senjang/Semi Senjang)

LEBAR TEBAL LUAS


LEBAR TEBAL PANJANG BERAT VOLUME BAHAN ANTI PENGELUPAS
STA RATA-RATA RATA-RATA RATA-RATA KET.
(m') (m') (m) (m) (m2) (m') (TON/M3) (m3)

06 + 100 6.00 0.050


6.00 0.050 0.30 100.00 2.27 68.10 12.99
06 + 000 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
05 + 900 6.00 0.050 -
6.00 0.050 0.30 90.00 2.27 61.29 11.69 5+808 Kali (10 M )
05 + 800 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
05 + 700 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
05 + 600 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
05 + 500 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
05 + 400 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
05 + 300 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
05 + 200 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
05 + 100 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
05 + 000 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
04 + 900 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
04 + 800 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
04 + 700 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
04 + 600 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
04 + 500 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
04 + 400 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
04 + 300 6.00 0.050 - 1,890.00
6.00 0.050 0.30 100.00 2.27 68.10 12.99 1,890.00
04 + 200 6.00 0.050 3,780.00
VOLUME 1,287.09 245.58
VOLUME LEMBAR SEBELUMNYA 12,887.93 2,459.03
VOLUME SAMPAI LEMBAR INI 14,175.02 2,704.61
VOLUME LATASTON LAPIS AUS (HRS-WC) (gradasi senjang/semi senjang) 14,175.02 2,704.61

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST RIAN PRIBOWO, ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
RIZAL SARIB, ST RIAN PRIBOWO, ST
QUANTITY ENGINEER SITE MANAGER

BACK UP DATA MC "0"


PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

Lataston Lapis Aus (HRS-WC) (Gradasi Senjang/Semi Senjang)

LEBAR TEBAL LUAS


LEBAR TEBAL PANJANG BERAT VOLUME BAHAN ANTI PENGELUPAS
STA RATA-RATA RATA-RATA RATA-RATA KET.
(m') (m') (m) (m) (m2) (m') (TON/M3) (m3)

04 + 200 6.00 0.050


6.00 0.050 0.30 100.00 2.27 68.10 12.99
04 + 100 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
04 + 000 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
03 + 900 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
03 + 800 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
03 + 700 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
03 + 600 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
03 + 500 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
03 + 400 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
03 + 300 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
03 + 200 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
03 + 100 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
03 + 000 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
02 + 900 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
02 + 800 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
02 + 700 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
02 + 600 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
02 + 500 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
02 + 400 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
02 + 300 6.00 0.050
VOLUME 1,293.90 246.88 1,900.00
VOLUME LEMBAR SEBELUMNYA 14,175.02 2,704.61 3,780.00
VOLUME SAMPAI LEMBAR INI 15,468.92 2,951.48 5,680.00
VOLUME LATASTON LAPIS AUS (HRS-WC) (gradasi senjang/semi senjang) 15,468.92 2,951.48

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST RIAN PRIBOWO, ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
RIZAL SARIB, ST RIAN PRIBOWO, ST
QUANTITY ENGINEER SITE MANAGER

BACK UP DATA MC "0"


PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

Lataston Lapis Aus (HRS-WC) (Gradasi Senjang/Semi Senjang)

LEBAR TEBAL LUAS


LEBAR TEBAL PANJANG BERAT VOLUME BAHAN ANTI PENGELUPAS
STA RATA-RATA RATA-RATA RATA-RATA KET.
(m') (m') (m) (m) (m2) (m') (TON/M3) (m3)

02 + 300 6.00 0.050


6.00 0.050 0.30 100.00 2.27 68.10 12.99
02 + 200 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
02 + 100 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
02 + 000 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
01 + 900 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
01 + 800 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
01 + 700 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
01 + 600 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
01 + 500 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
01 + 400 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
01 + 300 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
01 + 200 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
01 + 100 6.00 0.050 -
6.00 0.050 0.30 90.00 2.27 61.29 11.69 1+001 Kali (10 M)
01 + 000 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
00 + 900 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
00 + 800 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
00 + 700 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
00 + 600 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
00 + 500 6.00 0.050 - 1,890.00
6.00 0.050 0.30 100.00 2.27 68.10 12.99 5,680.00
00 + 400 6.00 7,570.00
VOLUME 1,287.09 245.58
VOLUME LEMBAR SEBELUMNYA 15,468.92 2,951.48
VOLUME SAMPAI LEMBAR INI 16,756.01 3,197.06
VOLUME LATASTON LAPIS AUS (HRS-WC) (gradasi senjang/semi senjang) 16,756.01 3,197.06

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST RIAN PRIBOWO, ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
RIZAL SARIB, ST RIAN PRIBOWO, ST
QUANTITY ENGINEER SITE MANAGER

BACK UP DATA MC "0"


PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

Lataston Lapis Aus (HRS-WC) (Gradasi Senjang/Semi Senjang)

LEBAR TEBAL LUAS


LEBAR TEBAL PANJANG BERAT VOLUME BAHAN ANTI PENGELUPAS
STA RATA-RATA RATA-RATA RATA-RATA KET.
(m') (m') (m) (m) (m2) (m') (TON/M3) (m3)

00 + 400 6.00 0.050


6.00 0.050 0.30 100.00 2.27 68.10 12.99
00 + 300 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
00 + 200 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
00 + 100 6.00 0.050 -
6.00 0.050 0.30 100.00 2.27 68.10 12.99
00 + 000 6.00 0.050 -
6.00 0.050 0.30 95.00 2.27 64.70 12.34
00 + 095 6.00

495.00
7,570.00
8,065.00
VOLUME 337.10 64.32
VOLUME LEMBAR SEBELUMNYA 16,756.01 3,197.06
VOLUME SAMPAI LEMBAR INI 17,093.10 3,261.38
VOLUME LATASTON LAPIS AUS (HRS-WC) (gradasi senjang/semi senjang) 17,093.10 3,261.38

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST RIAN PRIBOWO, ST


NIP : 19891226 201012 1 004 QUANTITY ENGGINER SITE MANAGER
REKAPITULASI VOLUME

PAKET : PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)


KONTRAKTOR : PT. MODERN WIDYA TEHNICAL
KONSULTAN :

NO. PEMBAYARAN :
PEKERJAAN : Beton mutu sedang fc’20 MPa

NO LOKASI URAIAN VOLUME KETERANGAN

Box Culvert
1 00 + 351 Box Culvert Ukuran (1.5 x 2) m 30.050
2 02 + 936 Box Culvert Ukuran (1.5 x 2) m 30.050
3 06 + 853 Box Culvert Ukuran (1.5 x 2) m 30.050
4 10 + 124 Box Culvert Ukuran (1.5 x 2) m 30.050
5 23 + 450 Box Culvert Ukuran (1.5 x 2) m 30.050

11 163100 - 163150 Talud 19.860

12 165817 - 165917 Talud 19.860

13 167600 - 167700 Talud 19.860

14 163075 - 163175 Talud 19.860

15 186125 - 186225 Talud 19.860

TOTAL VOLUME 249.550

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK PT. DHARMA ABADI CONSULTAN. JO
JAYA)

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST RIAN PRIBOWO, ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST RIAN PRIBOWO, ST
NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER

REKAPITULASI VOLUME

PAKET : PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)


KONTRAKTOR : PT. MODERN WIDYA TEHNICAL
KONSULTAN :

NO. PEMBAYARAN :
PEKERJAAN : Beton mutu rendah fc’15 MPa

NO LOKASI URAIAN VOLUME KETERANGAN

Box Culvert
1 00 + 351 Box Culvert Ukuran (1.5 x 2) m 1.350
2 02 + 936 Box Culvert Ukuran (1.5 x 2) m 1.350
3 06 + 853 Box Culvert Ukuran (1.5 x 2) m 1.350
4 10 + 124 Box Culvert Ukuran (1.5 x 2) m 1.350
5 23 + 450 Box Culvert Ukuran (1.5 x 2) m 1.350

TOTAL VOLUME 6.75

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK PT. DHARMA ABADI CONSULTAN. JO
JAYA)

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST GERSON.F.KENDENAN,ST.


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
BACK UP DATA MC O
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)

TAHUN ANGGARAN 2017 - 2019


NOMOR ITEM PEKERJAAN : 7.1 (7)a PEKERJAAN : BETON MUTU SEDANG fc'=20 Mpa
SKETSA PEKERJAAN BETON
L e b a r P e r k e ra s a n Ja la n B a h u J a la n

30
20

50

20
25
As Jalan

200

25
B a h u J a la n

B
70

40
Lantai Kerja Tebal
10 cm

TAMPAK MEMANJANG TAMPAK MELINTANG


SKALA 1 : 50 SKALA 1 : 50

D E N A H
S K A L A 1:100

DIMENSI
JUMLAH VOLUME
NO KM / S T A SEKMENT LEBAR TINGGI PANJANG KET.
SEKMENT
(m) (m) (m) (m3)

BOX CULVER PLAT 2.00 0.25 9.00 2.00 9.00


1.5 X 2 m
L : 1.5 DINDING 0.25 2.50 9.00 2.00 11.25
T : 2
P : 9 SUDUT 1/2 x 0,25 x 0,25 9.00 4.00 1.13
T : 0.25 21.38
P : 9.00
KAKI PENAHAN 0.40 0.70 2.50 2.00 1.40
BAWAH

KERB 0.30 0.20 2.00 2.00 0.20


(0.3+0.2)/2 0.20 2.00 2.00 0.20

SAYAP 2.75 0.25 2.50 4.00 6.88

1.60

Jumlah Volume / Unit 30.05


JUMLAH TOTAL UNTUK 1 UNIT 30.05

JUMLAH VOLUME LEMBAR INI (L7) #REF!


JUMLAH VOLUME S/D LEMBAR INI (L6 +L7)

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST GERSON.F.KENDENAN, ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
BACK UP DATA MC O
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)

TAHUN ANGGARAN 2017 - 2019


NOMOR ITEM PEKERJAAN : 7.1 (10) PEKERJAAN : BAJA TULANGAN U-24 POLOS
SKETSA PEKERJAAN BAJA TULANGAN
a=72 cm
c=139 cm
b=47cm a=72 cm


b=47cm
c=139 cm  10 - 20

D D
 10-20
a=254 cm 3 10 c
b
b=24 cm B1  12-20

 10-20 d
12-20 1620
a=72cm b=24 cm
Variabel   16-20
b=47 cm

28
 16-20
16 20
PENULANGAN KERB
SKALA 1 : 25

  16-20
12-20
 12-20
c=189cm


a=354cm
B2

Variabel
356 300
c=189 cm

b=92 cm

 10-20
 10-20

 10-20

a=36 cm
28
b=72cm   10-20
Tebal Plat 25 cm

70

 1 2-20
 16-20
C

DENAH PENULANGAN PENULANGAN PENAHAN BAWAH PENULANGAN PLAT UJUNG


SKALA ! : 50 SKALA ! : 25 SKALA ! : 25

DIA UKURAN PANJANG JUMLAH JUMLAH


BERAT
NO BENTUK TULANGAN KODE (Ф) a b c d e POT POT BERAT
(mm) (cm) (cm) (cm) (cm) (cm) (cm) Kg/m' (Kg)

A1 16 48 35 106 27 8 342 90 1.580 486.32


A2 16 36 35 131 27 8 343 90 1.580 487.75
B1 16 194 19 0 0 6 244 90 1.580 346.97
B2 16 244 19 0 0 6 275 90 1.580 391.05
C 12 894 11 - - 6 911 78 0.892 633.84
D 12 63 - - - 6 75 178 0.892 119.08
Jumlah 1 sekment 2,465.01
DINDING PENAHAN BAWAH
A 12 34 94 - - 5 266 12 0.892 28.47
B 12 250 - - - 5 260 8 0.892 18.55
Jumlah 2 sekment 94.05
KERB
A 12 69 41 28 34 5 182 21 0.892 34.09
B 12 194 - - - 5 204 14 0.892 25.48
Jumlah 2 sekment 119.14
DINDING SAYAP

A1 12 269.22 0.19 - - 5 548.63 48 0.887 233.5847088


B1 12 244.22 0.19 - - 5 23.841 56 0.887 0.21146967

Jumlah 4 sekment 935.18


Jumlah untuk 1 Unit Box Culvert 3,613.38

JUMLAH #REF!
JUMLAH VOLUME S/D LEMBAR INI

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST GERSON.F.KENDENAN, ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
BACK UP DATA MC "0"
BACK UP DATA

7.1 (7)a Beton Mutu Sedang F'c20 Mpa


KONTRAKTOR :
KONSULTAN :
350 350

Timbunan Biasa
50

150

80

80

Lokasi DIMENSI (M) LUAS JUMLAH Volume


No. Keterangan
Sta. - Sta. A B C (M2) ITEM M3

I KOLOM

1
1.50 0.40 0.30 0.12 27.00 4.86
on

2 SLOEF
100.00 0.25 0.30 0.08 1.00 7.50

3 RING BALOK

100.00 0.25 0.30 0.08 1.00 7.50

Sub Total untuk 1 titk 19.86

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK PT. DHARMA ABADI CONSULTAN. JO
JAYA)

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST GERSON.F.KENDENAN, ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
BACK UP MC 0
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)

TAHUN ANGGARAN 2017 - 2019

SKETSA

7.1(10) BETON K-125

DIMENSI
JUMLAH VOLUME
NO PEKERJAAN SEGMEN LEBAR TEBAL PANJANG KET.
SEGMEN
(m) (m) (m) (m3)

7.1(10) BOX CULVERT (2 x 3) PLAT (Lantai Kerja) 1.50 0.10 9.00 1.00 1.35

JUMLAH VOLUME / UNIT 1.35


JUMLAH VOLUME UNTUK 5 UNIT 6.75

………………….
JUMLAH 6.75

DISETUJUI DIPERIKSA OLEH DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PT. DHARMA ABADI KONSULTAN,JO
PROV. PAPUA (PUNCAK JAYA)

SYAHBULLAH PAEMBONAN, ST RIZAL,ST GERSON.F.KENDENAN, ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER Site Manager
Site Manager
REKAPITULASI VOLUME

PAKET : PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)


KONTRAKTOR : PT. MODERN WIDYA TEHNICAL
KONSULTAN :

NO. PEMBAYARAN :
PEKERJAAN : Baja Tulangan U 24 Polos

NO LOKASI URAIAN VOLUME KETERANGAN

Box Culvert
1 00 + 351 Box Culvert Ukuran (1.5 x 2) m 3613.380
2 02 + 936 Box Culvert Ukuran (1.5 x 2) m 3613.380
3 06 + 853 Box Culvert Ukuran (1.5 x 2) m 3613.380
4 10 + 124 Box Culvert Ukuran (1.5 x 2) m 3613.380
5 22 + 786 Box Culvert Ukuran (1.5 x 2) m 3613.380

11 KM 163100 - KM 163150 Talud 2076.654

12 165817 - 165917 Talud 2076.654

13 167600 - 167700 Talud 2076.654

14 163075 - 163175 Talud 2076.654

15 186125 - 186225 Talud 2076.654

TOTAL VOLUME 28450.171 KG

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK PT. DHARMA ABADI CONSULTAN. JO
JAYA)

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST GERSON.F.KENDENAN, ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
BACK UP DATA MC O
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)

TAHUN ANGGARAN 2017 - 2019

Pembesian Talud
DIA UKURAN PANJANG JUMLAH JUMLAH
BERAT
No. GAMBAR TULANGAN Ø A B C D E1 E2 POTONGAN POTONGAN BERAT
(MM) (M) (M) (M) (M) (M) (M) (M) (M) Kg/M' (KG)
III KOLOM

1 8.00 0.35 0.25 0.35 0.25 0.07 0.07 1.34 175.00 0.39 92.52

C
2 12.00 1.44 0.35 0.10 0.10 1.99 162.00 0.89 286.20

C
B

TOTAL BERAT 378.72

I SLOEF

1 8.00 0.20 0.20 0.25 0.25 0.07 0.07 1.04 667.00 0.39 273.70

2 12.00 11.80 0.10 0.10 12.00 54.00 0.89 575.27

II RING BALOK

1
8.00 0.20 0.20 0.25 0.25 0.07 0.07 1.04 667.00 0.39 273.70

2 12.00 11.80 0.10 0.10 12.00 54.00 0.89 575.27

TOTAL BERAT 1,697.93


TOTAL BERAT ( Untuk 1 titik) 2,076.65
DISETUJUI DI PERIKSA: DIBUAT :
KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK PT. DHARMA ABADI CONSULTAN. JO
JAYA)

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST GERSON.F.KENDENAN, ST


DISETUJUI DI PERIKSA: DIBUAT :
KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK PT. DHARMA ABADI CONSULTAN. JO
JAYA)

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST GERSON.F.KENDENAN, ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
BACK UP DATA MC "0"

BACK UP DATA
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)

TAHUN ANGGARAN 2017 - 2019

7.9 (1) Pasangan Batu (Untuk Talud)


KONTRAKTOR : PT. MODERN WIDYA TECHNICAL
KONSULTAN : PT. YODYA KARYA (PERSERO)

A
350 350

Timbunan Biasa
50

H
150

D
80
B
80

LOKASI PANJANG DIMENSI ( M ) LUAS VOLUME


NO KR / KN KET
( STA ) (M) H A B D ( M2 ) ( M3 )

1 163+100 - 163+150 50.00 1.50 0.5 0.80 0.80 1.62 80.75

2 165+817 - 165+917 100.00 1.50 0.5 0.80 0.80 1.62 161.50

3 167+600 - 167+700 100.00 1.50 0.5 0.80 0.80 1.62 161.50

4 163+075 - 163+175 100.00 1.50 0.5 0.80 0.80 1.62 161.50

5 186+125 186+225 100.00 1.50 0.5 0.80 0.80 1.62 161.50

TOTAL PASANGAN BATU TALUD 726.75 M3


DISETUJUI DI PERIKSA : DIBUAT :
KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO)PT DARMA PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) ABADI KONSULTAN JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST GERSON.F.KENDENAN, ST


NIP : 19891226 201012 1 004 QUANTITY ENGINER SITE MANAGER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
40 TAHUN ANGGARAN 2017 - 2019 40
250 Cm
LPB
HRS WC
50 Cm PAS BATU TIMBUNAN PILIHAN LPA 50 Cm

TIMBUNAN BIASA
ARAMCO Ø 2.25 M

400 Cm 400 Cm

80 Cm 80 Cm

GORONG - GORONG PIPA BAJA BERGELOMBANG


1000 Cm 400 Cm

Diameter Berat Tebal Panjang Berat Total


NO STA Keterangan
Ø Kg/ m' mm m' Kg

1 00 + 052 1.4 125 3 11.00 1,375.00 Baru


2 00 + 501 1.4 125 3 11.00 1,375.00 Ganti/ Rusak
3 01 + 590 1.4 125 3 11.00 1,375.00 Ganti/ Rusak
4 04 + 068 1.4 125 3 11.00 1,375.00 Baru
5 04 + 686 2.25 398 5 11.00 4,378.00 Baru/ Kali + Pas Batu
6 06 + 061 1.4 125 3 11.00 1,375.00 Baru
7 06 + 534 1.4 125 3 11.00 1,375.00 Ganti/ Rusak
8 07 + 415 1.4 125 3 11.00 1,375.00 Baru
9 08 + 050 1.4 125 3 11.00 1,375.00 Baru
10 08 + 400 1.4 125 3 11.00 1,375.00 Ganti/ Rusak + Pas Batu
11 09 + 769 2.25 398 5 11.00 4,378.00 Baru/ Kali + Pas Batu
12 10 + 007 1.4 125 3 11.00 1,375.00 Baru
13 10 + 807 1.4 125 3 11.00 1,375.00 Baru/ Kali + Pas Batu
14 11 + 049 2.25 398 5 11.00 4,378.00 Ganti/ Pas Batu + Aramco
15 11 + 799 1.4 125 3 11.00 1,375.00 Baru
16 12 + 905 1.4 125 3 11.00 1,375.00 Ganti/ Rusak + Pas Batu
17 13 + 961 1.4 125 3 11.00 1,375.00 Baru
18 15 + 344 2.25 398 5 11.00 4,378.00 Ganti/ Rusak + Pas Batu
19 16 + 140 1.4 125 3 11.00 1,375.00 Ganti/ Rusak + Pas Batu
20 18 + 601 1.4 125 3 11.00 1,375.00 Ganti/ Rusak + Pas Batu
21 19 + 587 1.4 125 3 11.00 1,375.00 Ganti/ Rusak + Pas Batu
22 21 + 488 1.4 125 3 11.00 1,375.00 Ganti/Rusak
23 24 + 500 225 398 5 12.60 5,014.80 Ganti/Rusak
24 24 + 616 1.4 125 3 12.00 1,500.00 Ganti/Rusak

Total Berat 51,776.80 Kg

DIPERIKSA DIBUAT :
DISETUJUI KONSULTAN
KOORDINATOR PENGAWAS LAPANGAN PENYEDIA JASA
PT. YODYA KARYA(PERSERO) PT. MODERN WIDYA TEHNICAL
PEJABAT PEMBUAT KOMITMEN V.1 PT.DHARMA ABADI KONSULTAN, JO.
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA)

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST.


NIP : 19891226 201012 1 004 GERSON.F.KENDENAN, ST
QUANTITY ENGINEER SITE MANAGER
QUANTITY ENGINEER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

Timbunan Pilihan dari Sumber Galian

LEBAR TEBAL PANJANG VOLUME


NO KM / S T A SKETSA KET
(M) (M) (M) (M3)

0+000 6.00 0.30


1,000.00 1,800.00 Badan Jalan
1+000 6.00 0.30
Timbunan Pilihan
t =20cm

1+005 6.00 0.30


4,803.00 8,645.40 Badan Jalan
6M 9.00
5+808 6.00 0.30

5+818 Timbunan Pilihan


t =20cm 6.00 0.30
2,092.00 3,765.60 Badan Jalan
7+910 6.00 0.30

7+920 9.00 6.00 0.30


1,730.00 3,114.00 Badan Jalan
9+650 6.00 0.30

9+660 6.00 0.30


4,140.00 7,452.00 Badan Jalan
13+800 6.00 0.30

13+820 6.00 0.30


915.00 1,647.00 Badan Jalan
14+735 6.00 0.30

14+750 6.00 0.30


2,060.00 3,708.00 Badan Jalan
16+810 6.00 0.30

JUMLAH ..... ( L1 ) 16,740.00 30,132.00


TOTAL 30,132.00
DISETUJUI DIPERIKSA
KONSULTAN DIBUAT :
KOORDINATOR PENGAWAS LAPANGAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA(PERSERO)
PT.DHARMA ABADI KONSULTAN, JO. PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA)

RIZAL SARIB, ST. GERSON.F.KENDENAN,ST


SYAHBULLAH PAEMBONAN, ST SITE MANAGER
NIP : 19891226 201012 1 004 QUANTITY ENGINEER
GERSON.F.KENDENAN,ST
SITE MANAGER

BACK UP DATA MC "0"


PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

Timbunan Pilihan dari Sumber Galian

LEBAR TEBAL PANJANG VOLUME


NO KM / S T A SKETSA KET
(M) (M) (M) (M3)

0+000 2.00 0.40


T. PILIHAN BAHU
1M 1M 1,001.00 790.79 Bahu Jalan
1+001 2.00 0.40
Sungai

1+011 Urpil Hrs t 5 cm


t 0.40 cm 2.00 0.40
Lpa t 25 cm
4,797.00 3,789.63 Bahu Jalan
Lpb t 12.5 cm
5+808 Urpil 2.00 0.40
t 40 cm Sungai

5+818 2.00 0.40


2,092.00 1,652.68 Bahu Jalan
7+910 Urpil Hrs t 5 cm 2.00 0.40 Sungai
t 0.40 cm Lpa t 25 cm
Lpb t 12.5 cm
7+920 2.00 0.40
1,730.00 1,366.70 Bahu Jalan
9+650 2.00 0.40 J. Tinggi Nambut

9+660 T. PILIHAN BAHU 2.00 0.40


1M 1M
4,140.00 3,270.60 Bahu Jalan
13+800 2.00 0.40 J. Gurage

13+820 2.00 0.40


915.00 722.85 Bahu Jalan
14+735 2.00 0.40

14+745 2.00 0.40


8,455.00 6,679.45 Bahu Jalan
23+200 2.00 0.40 Sungai

23+210 2.00 0.40


849.00 679.20 Bahu jalan
24+059 2.00 0.40 Kali Semen

24+074 2.00 0.40


1,026.00 820.80 Bahu jalan
25+100 2.00 0.40

JUMLAH ..... ( L2 ) 17115.00 19,772.70


JUMLAH ……(L1) 30,132.00
TOTAL 49,904.70

DISETUJUI DIPERIKSA
KOORDINATOR PENGAWAS LAPANGAN DIBUAT :
KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA(PERSERO)
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. MODERN WIDYA TEHNICAL
PT.DHARMA ABADI KONSULTAN, JO.

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST. GERSON.F.KENDENAN,ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST. GERSON.F.KENDENAN,ST
NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
RIZAL SARIB, ST. GERSON.F.KENDENAN,ST
QUANTITY ENGINEER SITE MANAGER

BACK UP DATA MC "0"


PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

Timbunan Pilihan dari Sumber Galian Titik Aramco

LEBAR TEBAL PANJANG VOLUME


NO KM / S T A SKETSA KET
(M) (M) (M) (M3)

1 00 + 052 11.00 0.30 6.00 19.80 Aramco


2 00 + 501 11.00 0.30 6.00 19.80 Aramco
3 01 + 590 11.00 0.30 6.00 19.80 Aramco
4 04 + 068 11.00 0.30 6.00 19.80 Aramco
5 04 + 686 11.00 0.30 6.00 19.80 Aramco
6 06 + 061 11.00 0.30 6.00 19.80 Aramco
7 06 + 534 11.00 0.30 6.00 19.80 Aramco
8 07 + 415 11.00 0.30 6.00 19.80 Aramco
9 08 + 050 11.00 0.30 6.00 19.80 Aramco
10 08 + 400 11.00 0.30 6.00 19.80 Aramco
11 09 + 769 11.00 0.30 6.00 19.80 Aramco
12 10 + 007 11.00 0.30 6.00 19.80 Aramco
13 10 + 807 11.00 0.30 6.00 19.80 Aramco
14 11 + 049 11.00 0.30 6.00 19.80 Aramco
15 11 + 799 11.00 0.30 6.00 19.80 Aramco
16 12 + 905 11.00 0.30 6.00 19.80 Aramco
17 13 + 961 11.00 0.30 6.00 19.80 Aramco
18 15 + 344 11.00 0.30 6.00 19.80 Aramco
19 16 + 140 11.00 0.30 6.00 19.80 Aramco
20 18 + 601 11.00 0.30 6.00 19.80 Aramco
21 19 + 587 11.00 0.30 6.00 19.80 Aramco
22 21 + 488 11.00 0.30 6.00 19.80 Aramco
23 24 + 500 11.00 0.30 6.00 19.80 Aramco
24 24 + 616 11.00 0.30 6.00 19.80 Aramco

JUMLAH ..... ( L3 ) 475.20


JUMLAH ..... ( L1 + L2) 49,904.70
TOTAL 50,379.90

DISETUJUI DIPERIKSA DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA(PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT.DHARMA ABADI KONSULTAN, JO.

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST. GERSON.F.KENDENAN,ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
BACK UP DATA MC "0"
BACK UP DATA
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)

TAHUN ANGGARAN 2017 - 2019

7.9 (1) Pasangan Batu (Untuk Aramco)


KONTRAKTOR :
KONSULTAN :
C3
A2 C2

B1

A1

LOKASI Ø DIMENSI ( M ) LUAS VOLUME


NO KR / KN KET
( STA ) (M) H A B D ( M2 ) ( M3 )

Volume Pasangan Batu Untuk Ø 1.4 m Untuk 1 unit 9.670

Volume Pasangan Batu Untuk Ø 2.25 m Untuk 1 unit 17.589

1 00 + 052 1.40 9.670


2 01 + 803 1.40 9.670
3 02 + 762 1.40 9.670
4 04 + 099 1.40 9.670
5 04 + 686 2.25 17.589
6 06 + 061 1.40 9.670
7 06 + 534 1.40 9.670
8 07 + 415 1.40 9.670
9 08 + 050 1.40 9.670
10 08 + 400 1.40 9.670
11 09 + 769 2.25 17.589
12 10 + 007 1.40 9.670
13 10 + 807 1.40 9.670
14 11 + 049 2.25 17.589
15 11 + 799 1.40 9.670
16 12 + 905 1.40 9.670
17 13 + 961 1.40 9.670

VOLUME 188.15
VOLUME LEMBAR SEBELUMNYA -
VOLUME SAMPAI LEMBAR INI 188.15
VOLUME 188.15
DIBUAT :
DISETUJUI DI PERIKSA:
KOORDINATOR PENGAWAS LAPANGAN KONSULTAN
PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK PT. DHARMA ABADI CONSULTAN. JO
JAYA)

GERSON.F.KENDENAN,ST
SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST
NIP : 19891226 201012 1 004 QUANTITY ENGINEER
SITE MANAGER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
BACK UP DATA

TAHUN ANGGARAN 2017 - 2019

7.9 (1) Pasangan Batu (Untuk Aramco)


KONTRAKTOR :
KONSULTAN :
C3
A2 C2

B1

A1

LOKASI Ø DIMENSI ( M ) LUAS VOLUME


NO KR / KN KET
( STA ) (M) H A B D ( M2 ) ( M3 )

Volume Pasangan Batu Untuk Ø 1.4 m Untuk 1 unit 9.670

Volume Pasangan Batu Untuk Ø 2.25 m Untuk 1 unit 17.589

18 15 + 344 2.25 17.589


19 16 + 140 1.4 9.670
20 18 + 601 1.4 9.670
21 19 + 587 1.4 9.670
22 21 + 488 1.4 9.670
23 24 + 500 225 17.589
24 24 + 616 1.4 9.670

VOLUME 83.53
VOLUME LEMBAR SEBELUMNYA 188.15
VOLUME SAMPAI LEMBAR INI 271.68
VOLUME 271.68
DISETUJUI DI PERIKSA: #REF!
DIBUAT :
KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK PT. DHARMA ABADI CONSULTAN. JO
JAYA)

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST GERSON.F.KENDENAN, ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST GERSON.F.KENDENAN, ST
NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
BACK UP DATA MC "0"
BACK UP DATA
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)

TAHUN ANGGARAN 2017 - 2019

7.9 (1) Pasangan Batu (Untuk Aramco)


KONTRAKTOR :
KONSULTAN :
C3
A2 C2

B1

A1

LOKASI Ø DIMENSI ( M ) LUAS VOLUME


NO KR / KN KET
( STA ) (M) H A B D ( M2 ) ( M3 )

Volume Pasangan Batu Untuk Ø 1.4 m Untuk 1 unit 9.670

Volume Pasangan Batu Untuk Ø 2.25 m Untuk 1 unit 17.589

1 01 + 380 1.40 9.670


2 01 + 803 1.40 9.670
3 02 + 762 1.40 9.670
4 04 + 099 1.40 9.670
5 04 + 686 2.25 17.589
6 06 + 061 1.40 9.670
7 06 + 534 1.40 9.670
8 07 + 415 1.40 9.670
9 08 + 050 1.40 9.670
10 08 + 400 1.40 9.670
11 09 + 769 2.25 17.589
12 10 + 007 2.25 17.589
13 10 + 615 1.40 9.670
14 10 + 807 1.40 9.670
15 11 + 049 2.25 17.589
16 11 + 228 1.40 9.670
17 11 + 799 1.40 9.670
18 12 + 408 1.40 9.670
19 12 + 905 1.40 9.670
20 13 + 961 1.40 9.670

VOLUME 225.08
VOLUME LEMBAR SEBELUMNYA -
VOLUME SAMPAI LEMBAR INI 225.08
VOLUME 225.08
DISETUJUI DIPERIKSA OLEH DIBUAT :
KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA PT. DHARMA ABADI KONSULTAN,JO
(PUNCAK JAYA)

SYAHBULLAH PAEMBONAN, ST RIZAL,ST RYAN, ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER Site Manager
SYAHBULLAH PAEMBONAN, ST RIZAL,ST RYAN, ST
NIP : 19891226 201012 1 004 QUANTITY ENGINEER Site Manager
BACK UP DATA MC "0"

PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)


BACK UP DATA

TAHUN ANGGARAN 2017 - 2019

7.9 (1) Pasangan Batu (Untuk Aramco)


KONTRAKTOR :
KONSULTAN :
C3
A2 C2

B1

A1

LOKASI Ø DIMENSI ( M ) LUAS VOLUME


NO KR / KN KET
( STA ) (M) H A B D ( M2 ) ( M3 )

Volume Pasangan Batu Untuk Ø 1.4 m Untuk 1 unit 9.670

Volume Pasangan Batu Untuk Ø 2.25 m Untuk 1 unit 17.589

21 15 + 344 2.25 17.589


22 16 + 140 1.4 9.670
23 18 + 601 1.4 9.670
24 18 + 789 1.4 9.670
25 19 + 140 1.4 9.670
26 19 + 587 1.4 9.670
27 21 + 488 1.4 9.670
28 23 + 617 1.4 9.670
29 23 + 868 1.4 9.670
30 24 + 017 2.25 17.589

VOLUME 112.54
VOLUME LEMBAR SEBELUMNYA 225.08
VOLUME SAMPAI LEMBAR INI 337.61
VOLUME 337.61
DISETUJUI DIPERIKSA OLEH #REF!DIBUAT :
KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA PT. DHARMA ABADI KONSULTAN,JO
(PUNCAK JAYA)

SYAHBULLAH PAEMBONAN, ST RIZAL,ST RYAN, ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER Site Manager
REKAPITULASI VOLUME PAS. BATU TALUD DAN ARAMCO

PAKET : PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)


KONTRAKTOR : PT. MODERN WIDYA TEHNICAL
KONSULTAN :

NO. PEMBAYARAN : 7.9.(1)


PEKERJAAN : Pas. Batu

NO LOKASI URAIAN VOLUME KETERANGAN

TALUD 726.75

PASANGAN BATU ARAMCO 271.675

TOTAL VOLUME 998.425

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK PT. DHARMA ABADI CONSULTAN. JO
JAYA)

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST GERSON.F.KENDENAN, ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
GERSON.F.KENDENAN, ST
NIP : 19891226 201012 1 004 SITE MANAGER

REKAPITULASI VOLUME

PAKET : PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)


KONTRAKTOR : PT. MODERN WIDYA TEHNICAL
KONSULTAN :

NO. PEMBAYARAN :
PEKERJAAN : Beton mutu rendah fc’15 MPa

NO LOKASI URAIAN VOLUME KETERANGAN

Box Culvert
1 00 + 351 Box Culvert Ukuran (1.5 x 2) m 6.750
2 02 + 936 Box Culvert Ukuran (1.5 x 2) m 6.750
3 06 + 853 Box Culvert Ukuran (1.5 x 2) m 6.750
4 10 + 124 Box Culvert Ukuran (1.5 x 2) m 6.750
5 22 + 786 Box Culvert Ukuran (1.5 x 2) m 6.750

TOTAL VOLUME 33.750

DISETUJUI DI PERIKSA: DIBUAT :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK PT. DHARMA ABADI CONSULTAN. JO
JAYA)

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST RIAN PRIBOWO, ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

BERONJONG DENGAN KAWAT YANG DILAPISI GALVANIS

JUMLAH
LEBAR TINGGI PANJANG VOLUME
STA KOTAK KET.
(m') (m') (m) (m) (m3)

01 + 025
Lapis 1 4.00 8.00 1.00 2.00 16.00
Lapis 2 4.00 8.00 1.00 2.00 16.00
Lapis 3 4.00 8.00 1.00 2.00 16.00

01 + 250
Lapis 1 4.00 8.00 1.00 2.00 16.00
Lapis 2 4.00 8.00 1.00 2.00 16.00
Lapis 3 4.00 8.00 1.00 2.00 16.00

VOLUME 96.000
VOLUME LEMBAR SEBELUMNYA 0.000
VOLUME SAMPAI LEMBAR INI 96.000
VOLUME 96.000
DISETUJUI DI PERIKSA : DIBUAT :
KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB. ST GERSON.F.KENDENAN. ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITEMENEGER
SYAHBULLAH PAEMBONAN, ST RIZAL SARIB. ST GERSON.F.KENDENAN. ST
NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITEMENEGER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

BERONJONG DENGAN KAWAT YANG DILAPISI GALVANIS

JUMLAH
LEBAR TINGGI PANJANG VOLUME
STA KOTAK KET.
(m') (m') (m) (m) (m3)

1+500
Lapis 1 4.00 8.00 1.00 2.00 16.00
Lapis 2 4.00 8.00 1.00 2.00 16.00
Lapis 3 4.00 8.00 1.00 2.00 16.00

1+623
Lapis 1 4.00 8.00 1.00 2.00 16.00
Lapis 2 4.00 8.00 1.00 2.00 16.00
Lapis 3 4.00 8.00 1.00 2.00 16.00

1+925
Lapis 1 5.00 10.00 1.00 2.00 20.00
Lapis 2 5.00 10.00 1.00 2.00 20.00
Lapis 3 5.00 10.00 1.00 2.00 20.00

2+013
Lapis 1 5.00 10.00 1.00 2.00 20.00
Lapis 2 5.00 10.00 1.00 2.00 20.00
Lapis 3 5.00 10.00 1.00 2.00 20.00

3+207
Lapis 1 5.00 10.00 1.00 2.00 20.00
Lapis 2 5.00 10.00 1.00 2.00 20.00
Lapis 3 5.00 10.00 1.00 2.00 20.00

3+767
Lapis 1 4.00 8.00 1.00 2.00 16.00
Lapis 2 4.00 8.00 1.00 2.00 16.00
Lapis 3 4.00 8.00 1.00 2.00 16.00

3+917
Lapis 1 4.00 8.00 1.00 2.00 16.00
Lapis 2 4.00 8.00 1.00 2.00 16.00
Lapis 3 4.00 8.00 1.00 2.00 16.00
VOLUME 372.000
VOLUME LEMBAR SEBELUMNYA 96.000
VOLUME SAMPAI LEMBAR INI 468.000
VOLUME 468.000
DISETUJUI DI PERIKSA : DIBUAT :
KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB. ST GERSON.F.KENDENAN. ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITEMENEGER
SYAHBULLAH PAEMBONAN, ST RIZAL SARIB. ST GERSON.F.KENDENAN. ST
NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITEMENEGER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

BERONJONG DENGAN KAWAT YANG DILAPISI GALVANIS

JUMLAH
LEBAR TINGGI PANJANG VOLUME
STA KOTAK KET.
(m') (m') (m) (m) (m3)

4+400
Lapis 1 4.00 8.00 1.00 2.00 16.00
Lapis 2 4.00 8.00 1.00 2.00 16.00
Lapis 3 4.00 8.00 1.00 2.00 16.00

5+550
Lapis 1 4.00 8.00 1.00 2.00 16.00
Lapis 2 4.00 8.00 1.00 2.00 16.00
Lapis 3 4.00 8.00 1.00 2.00 16.00
0.00
5+738 0.00
Lapis 1 4.00 8.00 1.00 2.00 16.00
Lapis 2 4.00 8.00 1.00 2.00 16.00
Lapis 3 4.00 8.00 1.00 2.00 16.00

6+450
Lapis 1 4.00 8.00 1.00 2.00 16.00
Lapis 2 4.00 8.00 1.00 2.00 16.00
Lapis 3 4.00 8.00 1.00 2.00 16.00

6+925
Lapis 1 4.00 8.00 1.00 2.00 16.00
Lapis 2 4.00 8.00 1.00 2.00 16.00
Lapis 3 4.00 8.00 1.00 2.00 16.00

7+242
Lapis 1 4.00 8.00 1.00 2.00 16.00
Lapis 2 4.00 8.00 1.00 2.00 16.00
Lapis 3 4.00 8.00 1.00 2.00 16.00

8+833
Lapis 1 4.00 8.00 1.00 2.00 16.00
Lapis 2 4.00 8.00 1.00 2.00 16.00
Lapis 3 4.00 8.00 1.00 2.00 16.00
VOLUME 336.000
VOLUME LEMBAR SEBELUMNYA 468.000
VOLUME SAMPAI LEMBAR INI 804.000
VOLUME 804.000
DISETUJUI DI PERIKSA : DIBUAT :
KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB. ST GERSON.F.KENDENAN,ST.


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANEGER
SYAHBULLAH PAEMBONAN, ST RIZAL SARIB. ST GERSON.F.KENDENAN,ST.
NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANEGER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

BERONJONG DENGAN KAWAT YANG DILAPISI GALVANIS

JUMLAH
LEBAR TINGGI PANJANG VOLUME
STA KOTAK KET.
(m') (m') (m) (m) (m3)

10+577
Lapis 1 4.00 8.00 1.00 2.00 16.00
Lapis 2 4.00 8.00 1.00 2.00 16.00
Lapis 3 4.00 8.00 1.00 2.00 16.00

11+270
Lapis 1 4.00 8.00 1.00 2.00 16.00
Lapis 2 4.00 8.00 1.00 2.00 16.00
Lapis 3 4.00 8.00 1.00 2.00 16.00

11+520
Lapis 1 4.00 8.00 1.00 2.00 16.00
Lapis 2 4.00 8.00 1.00 2.00 16.00
Lapis 3 4.00 8.00 1.00 2.00 16.00

15+170
Lapis 1 4.00 8.00 1.00 2.00 16.00
Lapis 2 4.00 8.00 1.00 2.00 16.00
Lapis 3 4.00 8.00 1.00 2.00 16.00

15+543
Lapis 1 4.00 8.00 1.00 2.00 16.00
Lapis 2 4.00 8.00 1.00 2.00 16.00
Lapis 3 4.00 8.00 1.00 2.00 16.00

22+418
Lapis 1 4.00 8.00 1.00 2.00 16.00
Lapis 2 4.00 8.00 1.00 2.00 16.00
Lapis 3 4.00 8.00 1.00 2.00 16.00

23+050
Lapis 1 4.00 8.00 1.00 2.00 16.00
Lapis 2 4.00 8.00 1.00 2.00 16.00
Lapis 3 4.00 8.00 1.00 2.00 16.00
VOLUME 336.000
VOLUME LEMBAR SEBELUMNYA 804.000
VOLUME SAMPAI LEMBAR INI 1,140.000
VOLUME 1,140.000
DISETUJUI DI PERIKSA : DIBUAT :
KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB. ST GERSON.F.KENDENAN.ST,


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANEGER
SYAHBULLAH PAEMBONAN, ST RIZAL SARIB. ST GERSON.F.KENDENAN.ST,
NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANEGER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

BERONJONG DENGAN KAWAT YANG DILAPISI GALVANIS

JUMLAH
LEBAR TINGGI PANJANG VOLUME
STA KOTAK KET.
(m') (m') (m) (m) (m3)

23+415
Lapis 1 4.00 8.00 1.00 2.00 16.00
Lapis 2 4.00 8.00 1.00 2.00 16.00
Lapis 3 4.00 8.00 1.00 2.00 16.00

23+670
Lapis 1 4.00 8.00 1.00 2.00
Lapis 2 4.00 8.00 1.00 2.00
Lapis 3 4.00 8.00 1.00 2.00

24+075
Lapis 1 4.00 8.00 1.00 2.00 16.00
Lapis 2 4.00 8.00 1.00 2.00 16.00
Lapis 3 4.00 8.00 1.00 2.00 16.00

VOLUME 96.000
VOLUME LEMBAR SEBELUMNYA 1,140.000
VOLUME SAMPAI LEMBAR INI 1,236.000
VOLUME 1,236.000
DISETUJUI DI PERIKSA : DIBUAT :
KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB. ST GERSON.F.KENDENAN,ST.


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANEGER
SYAHBULLAH PAEMBONAN, ST RIZAL SARIB. ST GERSON.F.KENDENAN,ST.
NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANEGER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

BERONJONG DENGAN KAWAT YANG DILAPISI GALVANIS

JUMLAH
LEBAR TINGGI PANJANG VOLUME
STA KOTAK KET.
(m') (m') (m) (m) (m3)

Lapis 1 2.00 2.00 1.00 2.00 4.00


Lapis 2 2.00 2.00 1.00 2.00 4.00 Di Setiap Outlet Aramco
Lapis 3 2.00 2.00 1.00 2.00 4.00

Total 12.00

Jumlah Aramco 24.00

Total Volume Bronjong di Outlet Aramco 288.00

VOLUME 288.000
VOLUME LEMBAR SEBELUMNYA 1,236.000
VOLUME SAMPAI LEMBAR INI 1,524.000
VOLUME 1,524.000
DISETUJUI DI PERIKSA : DIBUAT :
KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA (PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI CONSULTAN. JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB. ST GERSON.F.KENDENAN,ST,


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANEGER
SYAHBULLAH PAEMBONAN, ST RIZAL SARIB. ST GERSON.F.KENDENAN,ST,
NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANEGER
PENYIAPAN BADAN JALAN
12

10

6 KET.

0
(m2)
(m')
RATA-RATA (m')
(m')
02 + 500 9.00
VOLUME
VOLUME LEMBAR SEBELUMNYA
VOLUME SAMPAI LEMBAR INI
VOLUM PENYIAPAN BADAN JALAN
DISETUJUI
KOORDINATOR PENGAWAS LAPANGAN
PEJABAT PEMBUAT KOMITMEN V.1
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA)

SYAHBULLAH PAEMBONAN, ST
NIP : 19891226 201012 1 004
DISETUJUI
KOORDINATOR PENGAWAS LAPANGAN
PEJABAT PEMBUAT KOMITMEN V.1
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA)

SYAHBULLAH PAEMBONAN, ST
NIP : 19891226 201012 1 004
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

9m

6m

PENYIAPAN BADAN JALAN

LEBAR
STA
(m')

02 + 500 9.00

02 + 400 9.00

02 + 300 9.00

02 + 200 9.00

02 + 100 9.00

02 + 000 9.00

01 + 900 9.00

01 + 800 9.00

01 + 700 9.00

01 + 600 9.00

01 + 500 9.00

01 + 400 9.00

01 + 300 9.00

01 + 200 9.00

01 + 100 9.00

01 + 000 9.00

00 + 900 9.00

00 + 800 9.00

00 + 700 9.00

00 + 600 9.00

00 + 500 9.00

00 + 400 9.00

00 + 300 9.00

00 + 200 9.00

00 + 100 9.00

0 + 000 9.00

0+095 9.00
VOLUME
VOLUME LEMBAR SEBELUMNYA
VOLUME SAMPAI LEMBAR INI
VOLUM PENYIAPAN BADAN JALAN
DISETUJUI
KOORDINATOR PENGAWAS LAPANGAN
PEJABAT PEMBUAT KOMITMEN V.1
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA)

SYAHBULLAH PAEMBONAN, ST
NIP : 19891226 201012 1 004
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA)

SYAHBULLAH PAEMBONAN, ST
NIP : 19891226 201012 1 004
SYAHBULLAH PAEMBONAN, ST
NIP : 19891226 201012 1 004
9.00 100.00 900.00

VOLUME 15300.00
VOLUME LEMBAR SEBELUMNYA 187335.00
VOLUME SAMPAI LEMBAR INI 202635.00
VOLUM PENYIAPAN BADAN JALAN 202635.00
DISETUJUI DIPERIKSA : DIBUAT :
KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA(PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI KONSULTAN, JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST. RIAN PRIBOWO, ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
DISETUJUI DIPERIKSA : DIBUAT :
KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA(PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI KONSULTAN, JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST. RIAN PRIBOWO, ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

9m

6m

PENYIAPAN BADAN JALAN

LEBAR
PANJANG VOLUME
RATA-RATA KET.
(m') (m') (m2)

9.00 100.00 900.00

9.00 100.00 900.00

9.00 100.00 900.00

9.00 100.00 900.00

9.00 100.00 900.00

9.00 100.00 900.00

9.00 100.00 900.00

9.00 100.00 900.00

9.00 100.00 900.00

9.00 100.00 900.00

9.00 100.00 900.00

9.00 100.00 900.00

9.00 100.00 900.00

9.00 100.00 900.00

9.00 90.00 810.00 STA 1 + 001 JEMBATAN (10 m)

9.00 100.00 900.00

9.00 100.00 900.00

9.00 100.00 900.00

9.00 100.00 900.00

9.00 100.00 900.00

9.00 100.00 900.00

9.00 100.00 900.00

9.00 100.00 900.00

9.00 100.00 900.00

9.00 100.00 900.00

9.00 95.00 855.00

VOLUME 23265.00
VOLUME LEMBAR SEBELUMNYA 202635.00
VOLUME SAMPAI LEMBAR INI 225900.00
VOLUM PENYIAPAN BADAN JALAN 225900.00
DISETUJUI DIPERIKSA : DIBUAT :
KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA(PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI KONSULTAN, JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST. RIAN PRIBOWO, ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI KONSULTAN, JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST. RIAN PRIBOWO, ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST.
NIP : 19891226 201012 1 004 QUANTITY ENGINEER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

3M
3M
TYPE MARKA JALAN LURUS TYPE MARKA DI TIKUNGAN

Marka Jalan Termoplastik

JUMLAH PANJANG LEBAR VOLUME


TIPE TRAK KET.
(M') (M') (M2)

TIKUNGAN 204 30 0.12 734.40

JALAN LURUS 1 18,385.00 0.12 1,103.10

VOLUME 1837.50
VOLUME LEMBAR SEBELUMNYA 0.00
VOLUME SAMPAI LEMBAR INI 1837.50
VOLUME Marka Jalan Termoplastik 1837.50
DISETUJUI DIPERIKSA : DIBUAT :
KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA(PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK PT. DHARMA ABADI KONSULTAN, JO
JAYA)

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST. GERSON.F.KENDENAN,ST.


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

PATOK PENGARAH

VOLUME
STA KET.
(BUAH)

22 + 300

S/D 400.00

21 + 900

1M 1M

JARAK ANTAR PATOK


VOLUME 400.00
VOLUME LEMBAR SEBELUMNYA 0.00
VOLUME SAMPAI LEMBAR INI 400.00
VOLUME PATOK PENGARAH 400.00
DISETUJUI DIPERIKSA : DIBUAT :
KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA(PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI KONSULTAN, JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST. GERSON.F.KENDENAN,ST.


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITE MANAGER
BACK UP DATA MC "0"
PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

PATOK KILOMETER

VOLUME
STA KET.
(BUAH)

25 + 100 1.00

24 + 100 1.00

23 + 100 1.00

22 + 100 1.00

21 + 100 1.00

20 + 100 1.00

19 + 100 1.00

18 + 100 1.00

17 + 100 1.00

16 + 100 1.00

15 + 100 1.00

14 + 100 1.00

13 + 100 1.00

12 + 100 1.00

11 + 100 1.00

10 + 100 1.00

09 + 100 1.00

08 + 100 1.00

07 + 100 1.00

06 + 100 1.00
VOLUME 20.00
VOLUME LEMBAR SEBELUMNYA 0.00
VOLUME SAMPAI LEMBAR INI 20.00
VOLUME PATOK KILOMETER 20.00
DISETUJUI DIPERIKSA : DIBUAT :
KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA(PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI KONSULTAN, JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST. GERSON.F.KENDENAN. ST


SITEMENEGER
NIP : 19891226 201012 1 004 QUANTITY ENGINEER
SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST. GERSON.F.KENDENAN. ST
SITEMENEGER
NIP : 19891226 201012 1 004 QUANTITY ENGINEER

BACK UP DATA MC "0"


PAKET REKONSTRUKSI JALAN KARUBAGA - ILU - MULIA (MYC)
TAHUN ANGGARAN 2017 - 2019

PATOK KILOMETER

VOLUME
STA KET.
(BUAH)

05 + 100 1.00

04 + 100 1.00

03 + 100 1.00

02 + 100 1.00

01 + 100 1.00

00 + 100

VOLUME 5.00
VOLUME LEMBAR SEBELUMNYA 20.00
VOLUME SAMPAI LEMBAR INI 25.00
VOLUME PATOK KILOMETER 25.00
DISETUJUI DIPERIKSA :
DIBUAT :
KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENYEDIA JASA
PEJABAT PEMBUAT KOMITMEN V.1 PT. YODYA KARYA(PERSERO) PT. MODERN WIDYA TEHNICAL
SATKER PJN WIL. V PROV. PAPUA (PUNCAK JAYA) PT. DHARMA ABADI KONSULTAN, JO

SYAHBULLAH PAEMBONAN, ST RIZAL SARIB, ST. GERSON.F.KENDENAN. ST


NIP : 19891226 201012 1 004 QUANTITY ENGINEER SITEMENEGER