Anda di halaman 1dari 37

PEMERINTAH KABUPATEN PENAJAM PASER UTARA

DINAS PEKERJAAN UMUM DAN PENATAAN RUANG


Jalan Propinsi KM. 9 Kel. Nipah-Nipah Kec. Penajam Kab. PPU – Telp. (0542) 7211451

BACK UP DATA VOLUME


( OKTOBER )

PROGRAM
PENYELENGGARAN JALAN

KEGIATAN
PENYELENGGARAN JALAN KABUPATEN/KOTA

SUB KEGIATAN
REKONSTRUKSI JALAN

PEKERJAAN
PENINGKATAN JALAN RT.28 KELURAHAN WARU KECAMATAN WARU (BANKEU TA.2022)

NOMOR KONTRAK : 625/6423/DPU-PR/BM/X/2022

TANGGAL KONTRAK : 04 OKTOBER 2022

NILAI KONTRAK : Rp. 2.368.954.000,-

KONTRAKTOR PELAKSANA KONSULTAN PENGAWAS

CV. KARYA ARUMI IRSANDI CV. BUANA LESTARI


PEMERINTAH KABUPATEN PENAJAM PASER UTARA
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Jalan Propinsi KM. 9 Kel. Nipah-Nipah Kec. Penajam Kab. PPU – Telp. (0542) 7211451

REKAPITULASI
BACK UP DATA VOLUME

PROGRAM : PENYELENGGARAAN JALAN


KEGIATAN : PENYELENGGARAAN JALAN KABUPATEN/KOTA
SUB KEGIATAN : REKONTRUKSI JALAN
PEKERJAAN : PENINGKATAN JALAN RT.28 KELURAHAN WARU KECAMATAN WARU (BANKEU TA.2022)
LOKASI : KEC. WARU
KONTRAKTOR : CV. KARYA ARUMI IRSANDI
KONSULTAN : CV. BUNGA BORNEO KONSULTAN

KONTRAK REALISASI VOLUME


NO. MATA
URAIAN PEKERJAAN VOLUME S/D VOLUME BULAN VOLUME S/D LEBIH / KET
PEMBAYARAN SATUAN VOLUME
BULAN LALU INI BULAN INI KURANG
a b c d e f g h i

DIVISI 1 UMUM
1.1 Papan Nama Proyek Buah 1.00 1.00 1.00
1.2 Mobilisasi Ls 1.00 1.00 1.00
1.8.(1) Manajemen dan Keselamatan Lalu Lintas Ls 1.00 1.00 1.00
1.19 Keselamatan dan Kesehatan Kerja Ls 1.00 1.00 1.00

DIVISI 3 PEKERJAAN TANAH DAN GEOSINTETIC


3.1.(1).a Galian Biasa (Manual) M2 4.80 5.99 5.99 1.19 LEBIH
3.3.(1) Penyiapan Badan Jalan M2 3,155.80 3,154.15 3,154.15 -1.65 KURANG

DIVISI 5 PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN


5.1.(2) Lapis Pondasi Agregat Kelas B M3 220.91 220.79 220.79 -0.12 LEBIH
5.3.(1a).c Perkerasan Beton Semen (OPC) fc'20 MPa M3 617.25 616.99 616.99 -0.26 KURANG
5.3.(3) Lapis Pondasi Bawah Beton Kurus (Concrete Vibrator) M3 220.91 220.79 220.79 -0.12 KURANG

DIVISI 7 STRUKTUR
7.1(7a) Beton struktur, fc'20 MPa M3 1.28 1.28 1.28
7.3(1) Baja Tulangan Polos-BJTP 280 Kg 162.90 187.58 187.58 24.68 LEBIH
7.6(1) Pondasi Cerucuk, Penyediaan dan Pemancangan M¹ 64.00 36.00 36.00 -28.00 KURANG
7.9.(1) Pasangan Batu M3 4.60 3.22 3.22 -1.38 KURANG

DISETUJUI OLEH DIPERIKSA OLEH DIBUAT OLEH


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
DPU-PR BIDANG BINA MARGA CV. BUNGA BORNEO KONSULTAN CV. KARYA ARUMI IRSANDI

MOHAMMAD HARDI, ST ANUGRAH KOMBONG, ST EKO BUDI PRABOWO, ST


SITE ENGINEER PELAKSANA LAPANGAN
NIP. 19840618 200701 1 002
REKAPITULASI BACKUP DATA VOLUME

PROGRAM : PENYELENGGARAAN JALAN


KEGIATAN : PENYELENGGARAAN JALAN KABUPATEN/KOTA
SUB KEGIATAN : REKONTRUKSI JALAN
PEKERJAAN : PENINGKATAN JALAN RT.28 KELURAHAN WARU KECAMATAN WARU (BANKEU TA.2022)
LOKASI : KEC. WARU

NO. URAIAN PEKERJAAN VOLUME KETERANGAN

1. PAPAN NAMA PROYEK 1.00

TOTAL VOLUME 1.00

DISETUJUI OLEH DIPERIKSA OLEH DIBUAT OLEH


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
DPU-PR BIDANG BINA MARGA CV. BUNGA BORNEO KONSULTAN CV. KARYA ARUMI IRSANDI

MOHAMMAD HARDI, ST ANUGRAH KOMBONG, ST EKO BUDI PRABOWO, ST


NIP. 19840618 200701 1 002 SITE ENGINEER PELAKSANA LAPANGAN
REKAPITULASI BACKUP DATA VOLUME

PROGRAM : PENYELENGGARAAN JALAN


KEGIATAN : PENYELENGGARAAN JALAN KABUPATEN/KOTA
SUB KEGIATAN : REKONTRUKSI JALAN
PEKERJAAN : PENINGKATAN JALAN RT.28 KELURAHAN WARU KECAMATAN WARU (BANKEU TA.2022)
LOKASI : KEC. WARU

NO. URAIAN PEKERJAAN VOLUME KETERANGAN

1. MOBILISASI 1.00

TOTAL VOLUME 1.00

DISETUJUI OLEH DIPERIKSA OLEH DIBUAT OLEH


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
DPU-PR BIDANG BINA MARGA CV. BUNGA BORNEO KONSULTAN CV. KARYA ARUMI IRSANDI

MOHAMMAD HARDI, ST ANUGRAH KOMBONG, ST EKO BUDI PRABOWO, ST


NIP. 19840618 200701 1 002 SITE ENGINEER PELAKSANA LAPANGAN
REKAPITULASI BACKUP DATA VOLUME

PROGRAM : PENYELENGGARAAN JALAN


KEGIATAN : PENYELENGGARAAN JALAN KABUPATEN/KOTA
SUB KEGIATAN : REKONTRUKSI JALAN
PEKERJAAN : PENINGKATAN JALAN RT.28 KELURAHAN WARU KECAMATAN WARU (BANKEU TA.2022)
LOKASI : KEC. WARU

NO. URAIAN PEKERJAAN VOLUME KETERANGAN

1. MANAJEMEN DAN KESELAMATAN LALU LINTAS 1.00

TOTAL VOLUME 1.00

DISETUJUI OLEH DIPERIKSA OLEH DIBUAT OLEH


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
DPU-PR BIDANG BINA MARGA CV. BUNGA BORNEO KONSULTAN CV. KARYA ARUMI IRSANDI

MOHAMMAD HARDI, ST ANUGRAH KOMBONG, ST EKO BUDI PRABOWO, ST


NIP. 19840618 200701 1 002 SITE ENGINEER PELAKSANA LAPANGAN
REKAPITULASI BACKUP DATA VOLUME

PROGRAM : PENYELENGGARAAN JALAN


KEGIATAN : PENYELENGGARAAN JALAN KABUPATEN/KOTA
SUB KEGIATAN : REKONTRUKSI JALAN
PEKERJAAN : PENINGKATAN JALAN RT.28 KELURAHAN WARU KECAMATAN WARU (BANKEU TA.2022)
LOKASI : KEC. WARU

NO. URAIAN PEKERJAAN VOLUME KETERANGAN

1. KESELAMATAN DAN KESEHATAN KERJA (K3) 1.00

TOTAL VOLUME 1.00

DISETUJUI OLEH DIPERIKSA OLEH DIBUAT OLEH


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
DPU-PR BIDANG BINA MARGA CV. BUNGA BORNEO KONSULTAN CV. KARYA ARUMI IRSANDI

MOHAMMAD HARDI, ST ANUGRAH KOMBONG, ST EKO BUDI PRABOWO, ST


NIP. 19840618 200701 1 002 SITE ENGINEER PELAKSANA LAPANGAN
REKAPITULASI BACKUP DATA VOLUME

PROGRAM : PENYELENGGARAAN JALAN


KEGIATAN : PENYELENGGARAAN JALAN KABUPATEN/KOTA
SUB KEGIATAN : REKONTRUKSI JALAN
PEKERJAAN : PENINGKATAN JALAN RT.28 KELURAHAN WARU KECAMATAN WARU (BANKEU TA.2022)
LOKASI : KEC. WARU

NO. URAIAN PEKERJAAN VOLUME KETERANGAN

1. GALIAN BIASA (MANUAL) 5.99

TOTAL VOLUME 5.99

DISETUJUI OLEH DIPERIKSA OLEH DIBUAT OLEH


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
DPU-PR BIDANG BINA MARGA CV. BUNGA BORNEO KONSULTAN CV. KARYA ARUMI IRSANDI

MOHAMMAD HARDI, ST ANUGRAH KOMBONG, ST EKO BUDI PRABOWO, ST


NIP. 19840618 200701 1 002 SITE ENGINEER PELAKSANA LAPANGAN
REKAPITULASI BACKUP DATA VOLUME

PROGRAM : PENYELENGGARAAN JALAN


KEGIATAN : PENYELENGGARAAN JALAN KABUPATEN/KOTA
SUB KEGIATAN : REKONTRUKSI JALAN
PEKERJAAN : PENINGKATAN JALAN RT.28 KELURAHAN WARU KECAMATAN WARU (BANKEU TA.2022)
LOKASI : KEC. WARU

NO. URAIAN PEKERJAAN VOLUME KETERANGAN

1. PENYIAPAN BADAN JALAN (LINK 1) 2339.95

2. PENYIAPAN BADAN JALAN (LINK 2) 345.00

3. PENYIAPAN BADAN JALAN (LINK 3) 469.20

TOTAL VOLUME 3154.15

DISETUJUI OLEH DIPERIKSA OLEH DIBUAT OLEH


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
DPU-PR BIDANG BINA MARGA CV. BUNGA BORNEO KONSULTAN CV. KARYA ARUMI IRSANDI

MOHAMMAD HARDI, ST ANUGRAH KOMBONG, ST EKO BUDI PRABOWO, ST


NIP. 19840618 200701 1 002 SITE ENGINEER PELAKSANA LAPANGAN
REKAPITULASI BACKUP DATA VOLUME

PROGRAM : PENYELENGGARAAN JALAN


KEGIATAN : PENYELENGGARAAN JALAN KABUPATEN/KOTA
SUB KEGIATAN : REKONTRUKSI JALAN
PEKERJAAN : PENINGKATAN JALAN RT.28 KELURAHAN WARU KECAMATAN WARU (BANKEU TA.2022)
LOKASI : KEC. WARU

NO. URAIAN PEKERJAAN VOLUME KETERANGAN

1. LAPIS PONDASI AGGREGAT KELAS B (LINK 1) 163.80

2. LAPIS PONDASI AGGREGAT KELAS B (LINK 2) 24.15

3. LAPIS PONDASI AGGREGAT KELAS B (LINK 3) 32.84

TOTAL VOLUME 220.79

DISETUJUI OLEH DIPERIKSA OLEH DIBUAT OLEH


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
DPU-PR BIDANG BINA MARGA CV. BUNGA BORNEO KONSULTAN CV. KARYA ARUMI IRSANDI

MOHAMMAD HARDI, ST ANUGRAH KOMBONG, ST EKO BUDI PRABOWO, ST


NIP. 19840618 200701 1 002 SITE ENGINEER PELAKSANA LAPANGAN
REKAPITULASI BACKUP DATA VOLUME

PROGRAM : PENYELENGGARAAN JALAN


KEGIATAN : PENYELENGGARAAN JALAN KABUPATEN/KOTA
SUB KEGIATAN : REKONTRUKSI JALAN
PEKERJAAN : PENINGKATAN JALAN RT.28 KELURAHAN WARU KECAMATAN WARU (BANKEU TA.2022)
LOKASI : KEC. WARU

NO. URAIAN PEKERJAAN VOLUME KETERANGAN

1. LAPIS PONDASI BAWAH BETON KURUS (LINK 1) 163.80

2. LAPIS PONDASI BAWAH BETON KURUS (LINK 2) 24.15

3. LAPIS PONDASI BAWAH BETON KURUS (LINK 3) 32.84

TOTAL VOLUME 220.79

DISETUJUI OLEH DIPERIKSA OLEH DIBUAT OLEH


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
DPU-PR BIDANG BINA MARGA CV. BUNGA BORNEO KONSULTAN CV. KARYA ARUMI IRSANDI

MOHAMMAD HARDI, ST ANUGRAH KOMBONG, ST EKO BUDI PRABOWO, ST


NIP. 19840618 200701 1 002 SITE ENGINEER PELAKSANA LAPANGAN
REKAPITULASI BACKUP DATA VOLUME

PROGRAM : PENYELENGGARAAN JALAN


KEGIATAN : PENYELENGGARAAN JALAN KABUPATEN/KOTA
SUB KEGIATAN : REKONTRUKSI JALAN
PEKERJAAN : PENINGKATAN JALAN RT.28 KELURAHAN WARU KECAMATAN WARU (BANKEU TA.2022)
LOKASI : KEC. WARU

NO. URAIAN PEKERJAAN VOLUME KETERANGAN

1. PERKERASAN BETON SEMEN (OPC) FC'20 MPa (LINK 1) 457.69

2. PERKERASAN BETON SEMEN (OPC) FC'20 MPa (LINK 2) 67.50

3. PERKERASAN BETON SEMEN (OPC) FC'20 MPa (LINK 3) 91.80

TOTAL VOLUME 616.99

DISETUJUI OLEH DIPERIKSA OLEH DIBUAT OLEH


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
DPU-PR BIDANG BINA MARGA CV. BUNGA BORNEO KONSULTAN CV. KARYA ARUMI IRSANDI

MOHAMMAD HARDI, ST ANUGRAH KOMBONG, ST EKO BUDI PRABOWO, ST


NIP. 19840618 200701 1 002 SITE ENGINEER PELAKSANA LAPANGAN
REKAPITULASI BACKUP DATA VOLUME

PROGRAM : PENYELENGGARAAN JALAN


KEGIATAN : PENYELENGGARAAN JALAN KABUPATEN/KOTA
SUB KEGIATAN : REKONTRUKSI JALAN
PEKERJAAN : PENINGKATAN JALAN RT.28 KELURAHAN WARU KECAMATAN WARU (BANKEU TA.2022)
LOKASI : KEC. WARU

NO. URAIAN PEKERJAAN VOLUME KETERANGAN

1. BETON STRUKTUR, FC'20 Mpa 1.28

TOTAL VOLUME 1.28

DISETUJUI OLEH DIPERIKSA OLEH DIBUAT OLEH


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
DPU-PR BIDANG BINA MARGA CV. BUNGA BORNEO KONSULTAN CV. KARYA ARUMI IRSANDI

MOHAMMAD HARDI, ST ANUGRAH KOMBONG, ST EKO BUDI PRABOWO, ST


NIP. 19840618 200701 1 002 SITE ENGINEER PELAKSANA LAPANGAN
REKAPITULASI BACKUP DATA VOLUME

PROGRAM : PENYELENGGARAAN JALAN


KEGIATAN : PENYELENGGARAAN JALAN KABUPATEN/KOTA
SUB KEGIATAN : REKONTRUKSI JALAN
PEKERJAAN : PENINGKATAN JALAN RT.28 KELURAHAN WARU KECAMATAN WARU (BANKEU TA.2022)
LOKASI : KEC. WARU

NO. URAIAN PEKERJAAN VOLUME KETERANGAN

1. BAJA TULANGAN POLOS - BJTP 280 187.58

TOTAL VOLUME 187.58

DISETUJUI OLEH DIPERIKSA OLEH DIBUAT OLEH


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
DPU-PR BIDANG BINA MARGA CV. BUNGA BORNEO KONSULTAN CV. KARYA ARUMI IRSANDI

MOHAMMAD HARDI, ST ANUGRAH KOMBONG, ST EKO BUDI PRABOWO, ST


NIP. 19840618 200701 1 002 SITE ENGINEER PELAKSANA LAPANGAN
REKAPITULASI BACKUP DATA VOLUME

PROGRAM : PENYELENGGARAAN JALAN


KEGIATAN : PENYELENGGARAAN JALAN KABUPATEN/KOTA
SUB KEGIATAN : REKONTRUKSI JALAN
PEKERJAAN : PENINGKATAN JALAN RT.28 KELURAHAN WARU KECAMATAN WARU (BANKEU TA.2022)
LOKASI : KEC. WARU

NO. URAIAN PEKERJAAN VOLUME KETERANGAN

1. PONDASI CERUCUK, PENYEDIAN DAN PEMANCANGAN 36.00

TOTAL VOLUME 36.00

DISETUJUI OLEH DIPERIKSA OLEH DIBUAT OLEH


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
DPU-PR BIDANG BINA MARGA CV. BUNGA BORNEO KONSULTAN CV. KARYA ARUMI IRSANDI

MOHAMMAD HARDI, ST ANUGRAH KOMBONG, ST EKO BUDI PRABOWO, ST


NIP. 19840618 200701 1 002 SITE ENGINEER PELAKSANA LAPANGAN
REKAPITULASI BACKUP DATA VOLUME

PROGRAM : PENYELENGGARAAN JALAN


KEGIATAN : PENYELENGGARAAN JALAN KABUPATEN/KOTA
SUB KEGIATAN : REKONTRUKSI JALAN
PEKERJAAN : PENINGKATAN JALAN RT.28 KELURAHAN WARU KECAMATAN WARU (BANKEU TA.2022)
LOKASI : KEC. WARU

NO. URAIAN PEKERJAAN VOLUME KETERANGAN

1. PASANGAN BATU 3.22

TOTAL VOLUME 3.22

DISETUJUI OLEH DIPERIKSA OLEH DIBUAT OLEH


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
DPU-PR BIDANG BINA MARGA CV. BUNGA BORNEO KONSULTAN CV. KARYA ARUMI IRSANDI

MOHAMMAD HARDI, ST ANUGRAH KOMBONG, ST EKO BUDI PRABOWO, ST


NIP. 19840618 200701 1 002 SITE ENGINEER PELAKSANA LAPANGAN
BACK UP DATA VOLUME
PAPAN NAMA PROYEK

PROGRAM : PENYELENGGARAAN JALAN


KEGIATAN : PENYELENGGARAAN JALAN KABUPATEN/KOTA
SUB KEGIATAN : REKONTRUKSI JALAN
PEKERJAAN : PENINGKATAN JALAN RT.28 KELURAHAN WARU KECAMATAN WARU (BANKEU TA.2022)
LOKASI : KEC. WARU

DIVISI 1. UMUM

NO. MATA HARGA SATUAN JUMLAH HARGA PEKERJAAN BOBOT


URAIAN PEKERJAAN SAT VOLUME
PEMBAYARAN (Rp) (Rp) (%)

1.1 Papan Nama Proyek Buah 1.00 450,000.00 450,000.00 0.021

Papan Nama Proyek Buah 1.00 450,000.00 450,000.00 0.021

JUMLAH TOTAL 450,000.00 0.021

DISETUJUI OLEH, DIPERIKSA OLEH DIBUAT OLEH


PENGAWAS LAPANGAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
DPU-PR BIDANG BINA MARGA CV. BUNGA BORNEO KONSULTAN CV. KARYA ARUMI IRSANDI

1. MUHAMMAD SA'I : ……………………………..


ANUGRAH KOMBONG, ST EKO BUDI PRABOWO, ST
2. NANDA PUTRI LESTARI, ST : …………………………….. SITE ENGINEER PELAKSANA LAPANGAN
BACK UP DATA VOLUME
MOBILISASI

PROGRAM : PENYELENGGARAAN JALAN


KEGIATAN : PENYELENGGARAAN JALAN KABUPATEN/KOTA
SUB KEGIATAN : REKONTRUKSI JALAN
PEKERJAAN : PENINGKATAN JALAN RT.28 KELURAHAN WARU KECAMATAN WARU (BANKEU TA.2022)
LOKASI : KEC. WARU

DIVISI 1. UMUM

NO. MATA HARGA SATUAN JUMLAH HARGA PEKERJAAN BOBOT


URAIAN PEKERJAAN SAT VOLUME
PEMBAYARAN (Rp) (Rp) (%)

1.2 Mobilisasi Ls 1.00 16,800,000.00 16,800,000.00 0.787


A Mobilisasi Peralatan
1 Concrete Mixer Unit 2.00 150,000.00 300,000.00 0.014
2 Generator Set Unit 2.00 150,000.00 300,000.00 0.014
3 Motor Grader Unit 1.00 2,400,000.00 2,400,000.00 0.112
4 Whell Loader Unit 1.00 2,400,000.00 2,400,000.00 0.112
5 Vibrator Roller Unit 1.00 2,400,000.00 2,400,000.00 0.112
6 Concrete Vibrator Unit 3.00 150,000.00 450,000.00 0.021
7 Concrete Screed Unit 1.00 150,000.00 150,000.00 0.007

B Demobilisasi Peralatan Ls 1.00 8,400,000.00 8,400,000.00 0.394

JUMLAH TOTAL 16,800,000.00 0.787

DISETUJUI OLEH, DIPERIKSA OLEH DIBUAT OLEH


PENGAWAS LAPANGAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
DPU-PR BIDANG BINA MARGA CV. BUNGA BORNEO KONSULTAN CV. KARYA ARUMI IRSANDI

1. MUHAMMAD SA'I : ……………………………..


ANUGRAH KOMBONG, ST EKO BUDI PRABOWO, ST
2. NANDA PUTRI LESTARI, ST : …………………………….. SITE ENGINEER PELAKSANA LAPANGAN
BACK UP DATA VOLUME
MANAJEMEN DAN KESELAMATAN LALU LINTAS

PROGRAM : PENYELENGGARAAN JALAN


KEGIATAN : PENYELENGGARAAN JALAN KABUPATEN/KOTA
SUB KEGIATAN : REKONTRUKSI JALAN
PEKERJAAN : PENINGKATAN JALAN RT.28 KELURAHAN WARU KECAMATAN WARU (BANKEU TA.2022)
LOKASI : KEC. WARU

DIVISI 1. UMUM

NO. MATA HARGA SATUAN JUMLAH HARGA PEKERJAAN BOBOT


URAIAN PEKERJAAN SAT VOLUME
PEMBAYARAN (Rp) (Rp) (%)

1.8.(1) Manajemen Dan Keselamatan Lalu Lintas Ls 1.00 8,464,427.50 8,464,427.50 0.397
A Data dan Asumsi
1 Panjang Lokasi Pekerjaan KM 6.32 3,500 22,102.50 0.001
2 Total Masa Pelaksanaan Kegiatan Bulan 3.00 300,000 900,000.00 0.042
3 Masa Mobilisasi Bulan 2.00 300,000 600,000.00 0.028
4 Periode Pekerjaan Perkerasan Jalan Bulan 3.50 300,000 1,050,000.00 0.049
5 Panjang Zona Kerja Perkerasan Jalan M 694.95 3,500 2,432,325.00 0.114

B Peralatan
1 Rambu Batas Kecepatan Buah 1.00 200,000.00 200,000.00 0.009
2 Rambu Peringatan dengan Kata - Kata Buah 1.00 200,000.00 200,000.00 0.009
3 Rambu Peringatan Pekerjaan di Jalan Buah 2.00 200,000.00 400,000.00 0.019
4 Traffic Cone Buah 2.00 200,000.00 400,000.00 0.019
5 Police Line Buah 2.00 100,000.00 200,000.00 0.009
6 Tongkat Pengatur Lalu Lintas (Warning Light Stick) Buah 2.00 30,000.00 60,000.00 0.003
7 Peralatan komunikasi dan Lainnya Set 1.00 2,000,000.00 2,000,000.00 0.094

C Tenaga Personil
1 Pekerja (Flagman) OB 3.00 3,000,000.00 9,000,000.00 0.422

JUMLAH TOTAL 8,464,427.50 0.397

DISETUJUI OLEH, DIPERIKSA OLEH DIBUAT OLEH


PENGAWAS LAPANGAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
DPU-PR BIDANG BINA MARGA CV. BUNGA BORNEO KONSULTAN CV. KARYA ARUMI IRSANDI

1. MUHAMMAD SA'I : ……………………………..


ANUGRAH KOMBONG, ST EKO BUDI PRABOWO, ST
2. NANDA PUTRI LESTARI, ST : …………………………….. SITE ENGINEER PELAKSANA LAPANGAN
BACK UP DATA VOLUME
KESELAMATAN DAN KESEHATAN KERJA (K3)

PROGRAM : PENYELENGGARAAN JALAN


KEGIATAN : PENYELENGGARAAN JALAN KABUPATEN/KOTA
SUB KEGIATAN : REKONTRUKSI JALAN
PEKERJAAN : PENINGKATAN JALAN RT.28 KELURAHAN WARU KECAMATAN WARU (BANKEU TA.2022)
LOKASI : KEC. WARU

DIVISI 1. UMUM

NO. MATA HARGA SATUAN JUMLAH HARGA PEKERJAAN BOBOT


URAIAN PEKERJAAN SAT VOLUME
PEMBAYARAN (Rp) (Rp) (%)

1.19.(1) Keselamatan Dan Kesehatan Kerja (K3) Ls 1.00 17,742,000.00 17,742,000.00 0.831
A Penyiapan RK3K
1 Pembuatan Dokumen Rencana Keselamatan Kontruksi' Set 1.00 500,000.00 500,000.00 0.023
2 Pembuatan Prosedur dan Intruksi Kerja
3 Penyiapan Formulir

B Sosialisasi Dan Promosi K3


1 Induksi K3 (Safety Induction) Org 9.00 300,000.00 2,700,000.00 0.127
2 Pertemuan keselamatan ( Safety Talk / Tool Box Meeting) Org 9.00 600,000.00 5,400,000.00 0.253
3 P3K Org 1.00 1,000,000.00 1,000,000.00 0.047
4 Spanduk (banner) Lb 1.00 300,000.00 300,000.00 0.014
5 Poster Lb 1.00 100,000.00 100,000.00 0.005
6 Papan Informasi K3 Bh 2.00 50,000.00 100,000.00 0.005

C Alat Pelindung Kerja (APK) dan Alat Pelindung Diri (APD)


1 Topi Pelindung (saftety helmet) Bh 9.00 100,000.00 900,000.00 0.042
2 Pelindung Mata (goggles, spectacles) Pasang 9.00 50,000.00 450,000.00 0.021
3 Pelindung Pernafasan dan Mulut (Masker) Box 7.00 30,000.00 210,000.00 0.010
6 Sarung Tangan (safety gloves) Pasang 9.00 3,000.00 27,000.00 0.001
7 Sepatu Keselamatan (safety shoes) Pasang 9.00 300,000.00 2,700,000.00 0.127
8 Rompi Keselamatan (safety vest) Bh 9.00 45,000.00 405,000.00 0.019

D Asuransi dan Perizinan


1 Asuransi dan Perizinan Ls 1.00 600,000.00 600,000.00 0.028

E Personel K3 Konstruksi
1 Petugas K3 OB 3.50 500,000.00 1,750,000.00 0.082

F Fasilitas sarana kesehatan


1 Peralatan P3K Ls 1.00 100,000.00 100,000.00 0.005

G Lain - lain terkait pengendalian risiko K3


1 Alat pemadam api ringan (APAR) Bh 1.00 200,000.00 200,000.00 0.009
2 Bendera K3 Bh 1.00 50,000.00 50,000.00 0.002
3 Lampu darurat (Emergency Lamp) Bh 1.00 200,000.00 200,000.00 0.009
4 Titik Kumpul (assembly point) Bh 1.00 50,000.00 50,000.00 0.002

JUMLAH TOTAL 17,742,000.00 0.831

DISETUJUI OLEH, DIPERIKSA OLEH DIBUAT OLEH


PENGAWAS LAPANGAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
DPU-PR BIDANG BINA MARGA CV. BUNGA BORNEO KONSULTAN CV. KARYA ARUMI IRSANDI

1. MUHAMMAD SA'I : ……………………………..


ANUGRAH KOMBONG, ST EKO BUDI PRABOWO, ST
2. NANDA PUTRI LESTARI, ST : …………………………….. SITE ENGINEER PELAKSANA LAPANGAN
BACK UP DATA VOLUME
PENYIAPAN BADAN JALAN

PROGRAM : PENYELENGGARAAN JALAN


KEGIATAN : PENYELENGGARAAN JALAN KABUPATEN/KOTA
SUB KEGIATAN : REKONTRUKSI JALAN
PEKERJAAN : PENINGKATAN JALAN RT.28 KELURAHAN WARU KECAMATAN WARU (BANKEU TA.2022)
LOKASI : KEC. WARU

SKETSA GAMBAR LINK 1

Lebar

LEBAR LEBAR
LEBAR PANJANG VOLUME
NO. STA RATA-RATA DIBAYARKAN KETERANGAN
(m¹) (m¹) (m¹) (m¹) (m²)

1 0 + 000 10.00
7.55 7.55 4.00 30.20
2 0 + 004 5.10
5.10 5.10 21.00 107.10
3 0 + 025 5.10
5.10 5.10 25.00 127.50
4 0 + 050 5.10
5.10 5.10 25.00 127.50
5 0 + 075 5.10
5.10 5.10 25.00 127.50
6 0 + 100 5.10
5.10 5.10 25.00 127.50
7 0 + 125 5.10
5.10 5.10 25.00 127.50
8 0 + 150 5.10
5.10 5.10 25.00 127.50
9 0 + 175 5.10
5.10 5.10 25.00 127.50
10 0 + 200 5.10
5.10 5.10 25.00 127.50
11 0 + 225 5.10
5.10 5.10 25.00 127.50
12 0 + 250 5.10
5.10 5.10 25.00 127.50
13 0 + 275 5.10
5.10 5.10 19.00 96.90
14 0 + 294 5.10
4.60 4.60 6.00 27.60
15 0 + 300 4.10
4.10 4.10 25.00 102.50
16 0 + 325 4.10
4.10 4.10 25.00 102.50
17 0 + 350 4.10
4.10 4.10 25.00 102.50
18 0 + 375 4.10
4.10 4.10 10.00 41.00
19 0 + 385 4.10
3.85 3.85 15.00 57.75
20 0 + 400 3.60
3.60 3.60 25.00 90.00
21 0 + 425 3.60
3.60 3.60 25.00 90.00
22 0 + 450 3.60
3.60 3.60 25.00 90.00
23 0 + 475 3.60
3.60 3.60 11.00 39.60
24 0 + 486 3.60
3.15 3.15 8.00 25.20
25 0 + 494 2.70
2.70 2.70 6.00 16.20
26 0 + 500 2.70
2.70 2.70 17.00 45.90
27 0 + 517 2.70

TOTAL 517.00 2,339.95

DISETUJUI OLEH, DIPERIKSA OLEH DIBUAT OLEH


PENGAWAS LAPANGAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
DPU-PR BIDANG BINA MARGA CV. BUNGA BORNEO KONSULTAN CV. KARYA ARUMI IRSANDI

1. MUHAMMAD SA'I : ……………………………..


ANUGRAH KOMBONG, ST EKO BUDI PRABOWO, ST
2. NANDA PUTRI LESTARI, ST : …………………………….. SITE ENGINEER PELAKSANA LAPANGAN
BACK UP DATA VOLUME
PENYIAPAN BADAN JALAN

PROGRAM : PENYELENGGARAAN JALAN


KEGIATAN : PENYELENGGARAAN JALAN KABUPATEN/KOTA
SUB KEGIATAN : REKONTRUKSI JALAN
PEKERJAAN : PENINGKATAN JALAN RT.28 KELURAHAN WARU KECAMATAN WARU (BANKEU TA.2022)
LOKASI : KEC. WARU

SKETSA GAMBAR LINK 2

Lebar

LEBAR LEBAR
LEBAR PANJANG VOLUME
NO. STA RATA-RATA DIBAYARKAN KETERANGAN
(m¹) (m¹) (m¹) (m¹) (m²)

1 0 + 000 4.60
4.60 4.60 25.00 115.00
2 0 + 025 4.60
4.60 4.60 25.00 115.00
3 0 + 050 4.60
4.60 4.60 25.00 115.00
4 0 + 075 4.60

TOTAL 75.00 345.00

DISETUJUI OLEH, DIPERIKSA OLEH DIBUAT OLEH


PENGAWAS LAPANGAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
DPU-PR BIDANG BINA MARGA CV. BUNGA BORNEO KONSULTAN CV. KARYA ARUMI IRSANDI

1. MUHAMMAD SA'I : ……………………………..


ANUGRAH KOMBONG, ST EKO BUDI PRABOWO, ST
2. NANDA PUTRI LESTARI, ST : …………………………….. SITE ENGINEER PELAKSANA LAPANGAN
BACK UP DATA VOLUME
PENYIAPAN BADAN JALAN

PROGRAM : PENYELENGGARAAN JALAN


KEGIATAN : PENYELENGGARAAN JALAN KABUPATEN/KOTA
SUB KEGIATAN : REKONTRUKSI JALAN
PEKERJAAN : PENINGKATAN JALAN RT.28 KELURAHAN WARU KECAMATAN WARU (BANKEU TA.2022)
LOKASI : KEC. WARU

SKETSA GAMBAR LINK 3

Lebar

LEBAR LEBAR
LEBAR PANJANG VOLUME
NO. STA RATA-RATA DIBAYARKAN KETERANGAN
(m¹) (m¹) (m¹) (m¹) (m²)

1 0 + 000 4.60
4.60 4.60 25.00 115.00
2 0 + 025 4.60
4.60 4.60 25.00 115.00
3 0 + 050 4.60
4.60 4.60 25.00 115.00
4 0 + 075 4.60
4.60 4.60 25.00 115.00
5 0 + 100 4.60
4.60 4.60 2.00 9.20
6 0 + 102 4.60

TOTAL 102.00 469.20

DISETUJUI OLEH, DIPERIKSA OLEH DIBUAT OLEH


PENGAWAS LAPANGAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
DPU-PR BIDANG BINA MARGA CV. BUNGA BORNEO KONSULTAN CV. KARYA ARUMI IRSANDI

1. MUHAMMAD SA'I : ……………………………..


ANUGRAH KOMBONG, ST EKO BUDI PRABOWO, ST
2. NANDA PUTRI LESTARI, ST : …………………………….. SITE ENGINEER PELAKSANA LAPANGAN
BACK UP DATA VOLUME
LAPIS PONDASI BAWAH BETON KURUS (CONCRETE VIBRATOR)

PROGRAM : PENYELENGGARAAN JALAN


KEGIATAN : PENYELENGGARAAN JALAN KABUPATEN/KOTA
SUB KEGIATAN : REKONTRUKSI JALAN
PEKERJAAN : PENINGKATAN JALAN RT.28 KELURAHAN WARU KECAMATAN WARU (BANKEU TA.2022)
LOKASI : KEC. WARU

SKETSA GAMBAR LINK 1

TEBAL
TEBAL TEBAL LEBAR LEBAR PANJANG VOLUME
NO STA KIRI TENGAH KANAN LEBAR LUAS KETERANGAN
RATA-RATA RATA-RATA DIBAYARKAN RATA-RATA DIBAYARKAN
(m¹) (m¹) (m¹) (m¹) (m³)
0+004

1 0 + 000 0.07 0.07 0.07 0.07 10.00


0.07 0.07 7.55 7.55 0.53 4.00 2.11
2 0 + 004 0.07 0.07 0.08 0.07 5.10
0.07 0.07 5.10 5.10 0.36 21.00 7.50
3 0 + 025 0.07 0.06 0.07 0.07 5.10
0.08 0.07 5.10 5.10 0.36 25.00 8.93
4 0 + 050 0.08 0.08 0.09 0.08 5.10
0.09 0.07 5.10 5.10 0.36 25.00 8.93
5 0 + 075 0.10 0.08 0.09 0.09 5.10
0.09 0.07 5.10 5.10 0.36 25.00 8.93
6 0 + 100 0.08 0.095 0.08 0.09 5.10
0.09 0.07 5.10 5.10 0.36 25.00 8.93
7 0 + 125 0.10 0.08 0.08 0.09 5.10
0.09 0.07 5.10 5.10 0.36 25.00 8.93
8 0 + 150 0.08 0.08 0.10 0.09 5.10
0.09 0.07 5.10 5.10 0.36 25.00 8.93
9 0 + 175 0.09 0.075 0.10 0.09 5.10
0.09 0.07 5.10 5.10 0.36 25.00 8.93
10 0 + 200 0.10 0.07 0.08 0.08 5.10
0.09 0.07 5.10 5.10 0.36 25.00 8.93
11 0 + 225 0.11 0.08 0.10 0.10 5.10
0.09 0.07 5.10 5.10 0.36 25.00 8.93
12 0 + 250 0.08 0.09 0.07 0.08 5.10
0.09 0.07 5.10 5.10 0.36 25.00 8.93
13 0 + 275 0.10 0.10 0.09 0.10 5.10
0.10 0.07 5.10 5.10 0.36 19.00 6.78
14 0 + 294 0.12 0.10 0.10 0.11 5.10
0.10 0.07 4.60 4.60 0.32 6.00 1.93
15 0 + 300 0.09 0.095 0.10 0.10 4.10
0.09 0.07 4.10 4.10 0.29 25.00 7.18
16 0 + 325 0.09 0.11 0.08 0.09 4.10
0.09 0.07 4.10 4.10 0.29 25.00 7.18
17 0 + 350 0.10 0.08 0.10 0.09 4.10
0.09 0.07 4.10 4.10 0.29 25.00 7.18
18 0 + 375 0.08 0.06 0.09 0.08 4.10
0.08 0.07 4.10 4.10 0.29 10.00 2.87
19 0 + 385 0.09 0.07 0.07 0.08 4.10
0.08 0.07 3.85 3.85 0.27 15.00 4.04
20 0 + 400 0.09 0.065 0.09 0.08 3.60
0.08 0.07 3.60 3.60 0.25 25.00 6.30
21 0 + 425 0.08 0.07 0.09 0.08 3.60
0.09 0.07 3.60 3.60 0.25 25.00 6.30
22 0 + 450 0.07 0.15 0.08 0.10 3.60
0.09 0.07 3.60 3.60 0.25 25.00 6.30
23 0 + 475 0.08 0.075 0.07 0.08 3.60
0.08 0.07 3.60 3.60 0.25 11.00 2.77
24 0 + 486 0.08 0.075 0.07 0.08 3.60
0.08 0.07 3.15 3.15 0.22 8.00 1.76
25 0 + 494 0.08 0.075 0.07 0.08 2.70
0.08 0.07 2.70 2.70 0.19 6.00 1.13
26 0 + 500 0.08 0.075 0.08 0.08 2.70
0.08 0.07 2.70 2.70 0.19 17.00 3.21
27 0 + 517 0.07 0.075 0.07 0.07 2.70

TOTAL 517.00 163.80

DISETUJUI OLEH, DIPERIKSA OLEH DIBUAT OLEH


PENGAWAS LAPANGAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
DPU-PR BIDANG BINA MARGA CV. BUNGA BORNEO KONSULTAN CV. KARYA ARUMI IRSANDI

1. MUHAMMAD SA'I : ……………………………..

ANUGRAH KOMBONG, ST EKO BUDI PRABOWO, ST


2. NANDA PUTRI LESTARI, ST : …………………………….. SITE ENGINEER PELAKSANA LAPANGAN
BACK UP DATA VOLUME
LAPIS PONDASI BAWAH BETON KURUS (CONCRETE VIBRATOR)

PROGRAM : PENYELENGGARAAN JALAN


KEGIATAN : PENYELENGGARAAN JALAN KABUPATEN/KOTA
SUB KEGIATAN : REKONTRUKSI JALAN
PEKERJAAN : PENINGKATAN JALAN RT.28 KELURAHAN WARU KECAMATAN WARU (BANKEU TA.2022)
LOKASI : KEC. WARU

SKETSA GAMBAR LINK 2

TEBAL
TEBAL TEBAL LEBAR LEBAR PANJANG VOLUME
NO STA KIRI TENGAH KANAN LEBAR LUAS KETERANGAN
RATA-RATA RATA-RATA DIBAYARKAN RATA-RATA DIBAYARKAN
(m¹) (m¹) (m¹) (m¹) (m³)

1 0+ 000 0.08 0.09 0.08 0.08 4.60


0.08 0.07 4.60 4.60 0.32 25.00 8.05
2 0+ 025 0.09 0.08 0.08 0.08 4.60
0.08 0.07 4.60 4.60 0.32 25.00 8.05
3 0+ 050 0.09 0.08 0.08 0.08 4.60
0.08 0.07 4.60 4.60 0.32 25.00 8.05
4 0+ 075 0.08 0.08 0.08 0.08 4.60

TOTAL 75.00 24.15

DISETUJUI OLEH, DIPERIKSA OLEH DIBUAT OLEH


PENGAWAS LAPANGAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
DPU-PR BIDANG BINA MARGA CV. BUNGA BORNEO KONSULTAN CV. KARYA ARUMI IRSANDI

1. MUHAMMAD SA'I : ……………………………..

ANUGRAH KOMBONG, ST EKO BUDI PRABOWO, ST


2. NANDA PUTRI LESTARI, ST : …………………………….. SITE ENGINEER PELAKSANA LAPANGAN
BACK UP DATA VOLUME
LAPIS PONDASI BAWAH BETON KURUS (CONCRETE VIBRATOR)

PROGRAM : PENYELENGGARAAN JALAN


KEGIATAN : PENYELENGGARAAN JALAN KABUPATEN/KOTA
SUB KEGIATAN : REKONTRUKSI JALAN
PEKERJAAN : PENINGKATAN JALAN RT.28 KELURAHAN WARU KECAMATAN WARU (BANKEU TA.2022)
LOKASI : KEC. WARU

SKETSA GAMBAR LINK 3

TEBAL
TEBAL TEBAL LEBAR LEBAR PANJANG VOLUME
NO STA KIRI TENGAH KANAN LEBAR LUAS KETERANGAN
RATA-RATA RATA-RATA DIBAYARKAN RATA-RATA DIBAYARKAN
(m¹) (m¹) (m¹) (m¹) (m³)

1 0+ 000 0.07 0.08 0.08 0.08 4.60


0.08 0.07 4.60 4.60 0.32 25.00 8.05
2 0+ 025 0.07 0.09 0.08 0.08 4.60
0.08 0.07 4.60 4.60 0.32 25.00 8.05
3 0+ 050 0.08 0.08 0.09 0.08 4.60
0.08 0.07 4.60 4.60 0.32 25.00 8.05
4 0+ 075 0.07 0.08 0.07 0.07 4.60
0.08 0.07 4.60 4.60 0.32 25.00 8.05
5 0+ 100 0.08 0.09 0.08 0.08 4.60
0.09 0.07 4.60 4.60 0.32 2.00 0.64
6 0+ 102 0.08 0.10 0.08 0.09 4.60

TOTAL 102.00 32.84

DISETUJUI OLEH, DIPERIKSA OLEH DIBUAT OLEH


PENGAWAS LAPANGAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
DPU-PR BIDANG BINA MARGA CV. BUNGA BORNEO KONSULTAN CV. KARYA ARUMI IRSANDI

1. MUHAMMAD SA'I : ……………………………..

ANUGRAH KOMBONG, ST EKO BUDI PRABOWO, ST


2. NANDA PUTRI LESTARI, ST : …………………………….. SITE ENGINEER PELAKSANA LAPANGAN
BACK UP DATA VOLUME
LAPIS PONDASI AGGREGAT KELAS B

PROGRAM : PENYELENGGARAAN JALAN


KEGIATAN : PENYELENGGARAAN JALAN KABUPATEN/KOTA
SUB KEGIATAN : REKONTRUKSI JALAN
PEKERJAAN : PENINGKATAN JALAN RT.28 KELURAHAN WARU KECAMATAN WARU (BANKEU TA.2022)
LOKASI : KEC. WARU

SKETSA GAMBAR LINK 1

TEBAL
TEBAL TEBAL LEBAR LEBAR PANJANG VOLUME
NO STA KIRI TENGAH KANAN LEBAR LUAS KETERANGAN
RATA-RATA RATA-RATA DIBAYARKAN RATA-RATA DIBAYARKAN
(m¹) (m¹) (m¹) (m¹) (m³)
0+004

1 0 + 000 0.10 0.10 0.11 0.10 10.00


0.10 0.07 7.55 7.55 0.53 4.00 2.11
2 0 + 004 0.10 0.10 0.11 0.10 5.10
0.10 0.07 5.10 5.10 0.36 21.00 7.50
3 0 + 025 0.13 0.08 0.10 0.10 5.10
0.10 0.07 5.10 5.10 0.36 25.00 8.93
4 0 + 050 0.10 0.07 0.10 0.09 5.10
0.09 0.07 5.10 5.10 0.36 25.00 8.93
5 0 + 075 0.09 0.08 0.10 0.09 5.10
0.09 0.07 5.10 5.10 0.36 25.00 8.93
6 0 + 100 0.08 0.09 0.09 0.09 5.10
0.09 0.07 5.10 5.10 0.36 25.00 8.93
7 0 + 125 0.09 0.09 0.09 0.09 5.10
0.09 0.07 5.10 5.10 0.36 25.00 8.93
8 0 + 150 0.09 0.07 0.10 0.09 5.10
0.09 0.07 5.10 5.10 0.36 25.00 8.93
9 0 + 175 0.10 0.08 0.09 0.09 5.10
0.09 0.07 5.10 5.10 0.36 25.00 8.93
10 0 + 200 0.10 0.09 0.08 0.09 5.10
0.08 0.07 5.10 5.10 0.36 25.00 8.93
11 0 + 225 0.08 0.07 0.08 0.08 5.10
0.08 0.07 5.10 5.10 0.36 25.00 8.93
12 0 + 250 0.09 0.08 0.09 0.09 5.10
0.09 0.07 5.10 5.10 0.36 25.00 8.93
13 0 + 275 0.08 0.08 0.10 0.09 5.10
0.09 0.07 5.10 5.10 0.36 19.00 6.78
14 0 + 294 0.08 0.08 0.10 0.09 5.10
0.09 0.07 4.60 4.60 0.32 6.00 1.93
15 0 + 300 0.09 0.08 0.11 0.09 4.10
0.09 0.07 4.10 4.10 0.29 25.00 7.18
16 0 + 325 0.09 0.08 0.09 0.09 4.10
0.09 0.07 4.10 4.10 0.29 25.00 7.18
17 0 + 350 0.09 0.08 0.08 0.08 4.10
0.08 0.07 4.10 4.10 0.29 25.00 7.18
18 0 + 375 0.09 0.07 0.07 0.08 4.10
0.08 0.07 4.10 4.10 0.29 10.00 2.87
19 0 + 385 0.08 0.08 0.07 0.08 4.10
0.08 0.07 3.85 3.85 0.27 15.00 4.04
20 0 + 400 0.09 0.08 0.09 0.09 3.60
0.09 0.07 3.60 3.60 0.25 25.00 6.30
21 0 + 425 0.09 0.08 0.08 0.08 3.60
0.08 0.07 3.60 3.60 0.25 25.00 6.30
22 0 + 450 0.09 0.07 0.07 0.08 3.60
0.08 0.07 3.60 3.60 0.25 25.00 6.30
23 0 + 475 0.08 0.08 0.07 0.08 3.60
0.08 0.07 3.60 3.60 0.25 11.00 2.77
24 0 + 486 0.09 0.08 0.08 0.08 3.60
0.08 0.07 3.15 3.15 0.22 8.00 1.76
25 0 + 494 0.09 0.07 0.07 0.08 2.70
0.08 0.07 2.70 2.70 0.19 6.00 1.13
26 0 + 500 0.08 0.08 0.07 0.08 2.70
0.08 0.07 2.70 2.70 0.19 17.00 3.21
27 0 + 517 0.09 0.08 0.09 0.09 2.70

TOTAL 517.00 163.80

DISETUJUI OLEH, DIPERIKSA OLEH DIBUAT OLEH


PENGAWAS LAPANGAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
DPU-PR BIDANG BINA MARGA CV. BUNGA BORNEO KONSULTAN CV. KARYA ARUMI IRSANDI

1. MUHAMMAD SA'I : ……………………………..

ANUGRAH KOMBONG, ST EKO BUDI PRABOWO, ST


2. NANDA PUTRI LESTARI, ST : …………………………….. SITE ENGINEER PELAKSANA LAPANGAN
BACK UP DATA VOLUME
LAPIS PONDASI AGGREGAT KELAS B

PROGRAM : PENYELENGGARAAN JALAN


KEGIATAN : PENYELENGGARAAN JALAN KABUPATEN/KOTA
SUB KEGIATAN : REKONTRUKSI JALAN
PEKERJAAN : PENINGKATAN JALAN RT.28 KELURAHAN WARU KECAMATAN WARU (BANKEU TA.2022)
LOKASI : KEC. WARU

SKETSA GAMBAR LINK 2

TEBAL
TEBAL TEBAL LEBAR LEBAR PANJANG VOLUME
NO STA KIRI TENGAH KANAN LEBAR LUAS KETERANGAN
RATA-RATA RATA-RATA DIBAYARKAN RATA-RATA DIBAYARKAN
(m¹) (m¹) (m¹) (m¹) (m³)

1 0+ 000 0.09 0.13 0.09 0.10 4.60


0.09 0.07 4.60 4.60 0.32 25.00 8.05
2 0+ 025 0.08 0.06 0.07 0.07 4.60
0.07 0.07 4.60 4.60 0.32 25.00 8.05
3 0+ 050 0.07 0.06 0.09 0.07 4.60
0.08 0.07 4.60 4.60 0.32 25.00 8.05
4 0+ 075 0.10 0.08 0.08 0.09 4.60

TOTAL 75.00 24.15

DISETUJUI OLEH, DIPERIKSA OLEH DIBUAT OLEH


PENGAWAS LAPANGAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
DPU-PR BIDANG BINA MARGA CV. BUNGA BORNEO KONSULTAN CV. KARYA ARUMI IRSANDI

1. MUHAMMAD SA'I : ……………………………..

ANUGRAH KOMBONG, ST EKO BUDI PRABOWO, ST


2. NANDA PUTRI LESTARI, ST : …………………………….. SITE ENGINEER PELAKSANA LAPANGAN
BACK UP DATA VOLUME
LAPIS PONDASI AGGREGAT KELAS B

PROGRAM : PENYELENGGARAAN JALAN


KEGIATAN : PENYELENGGARAAN JALAN KABUPATEN/KOTA
SUB KEGIATAN : REKONTRUKSI JALAN
PEKERJAAN : PENINGKATAN JALAN RT.28 KELURAHAN WARU KECAMATAN WARU (BANKEU TA.2022)
LOKASI : KEC. WARU

SKETSA GAMBAR LINK 3

TEBAL
TEBAL TEBAL LEBAR LEBAR PANJANG VOLUME
NO STA KIRI TENGAH KANAN LEBAR LUAS KETERANGAN
RATA-RATA RATA-RATA DIBAYARKAN RATA-RATA DIBAYARKAN
(m¹) (m¹) (m¹) (m¹) (m³)

1 0+ 000 0.08 0.08 0.07 0.08 4.60


0.07 0.07 4.60 4.60 0.32 25.00 8.05
2 0+ 025 0.06 0.06 0.08 0.07 4.60
0.07 0.07 4.60 4.60 0.32 25.00 8.05
3 0+ 050 0.08 0.06 0.07 0.07 4.60
0.07 0.07 4.60 4.60 0.32 25.00 8.05
4 0+ 075 0.07 0.07 0.08 0.07 4.60
0.08 0.07 4.60 4.60 0.32 25.00 8.05
5 0+ 100 0.09 0.10 0.09 0.09 4.60
0.09 0.07 4.60 4.60 0.32 2.00 0.64
6 0+ 102 0.09 0.07 0.08 0.08 4.60

TOTAL 102.00 32.84

DISETUJUI OLEH, DIPERIKSA OLEH DIBUAT OLEH


PENGAWAS LAPANGAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
DPU-PR BIDANG BINA MARGA CV. BUNGA BORNEO KONSULTAN CV. KARYA ARUMI IRSANDI

1. MUHAMMAD SA'I : ……………………………..

ANUGRAH KOMBONG, ST EKO BUDI PRABOWO, ST


2. NANDA PUTRI LESTARI, ST : …………………………….. SITE ENGINEER PELAKSANA LAPANGAN
BACK UP DATA VOLUME
PERKERASAN BETON SEMEN (OPC) FC'20 MPa

PROGRAM : PENYELENGGARAAN JALAN


KEGIATAN : PENYELENGGARAAN JALAN KABUPATEN/KOTA
SUB KEGIATAN : REKONTRUKSI JALAN
PEKERJAAN : PENINGKATAN JALAN RT.28 KELURAHAN WARU KECAMATAN WARU (BANKEU TA.2022)
LOKASI : KEC. WARU

SKETSA GAMBAR LINK 1

TEBAL
TEBAL TEBAL LEBAR LEBAR PANJANG VOLUME
NO STA KIRI TENGAH KANAN LEBAR LUAS KETERANGAN
RATA-RATA RATA-RATA DIBAYARKAN RATA-RATA DIBAYARKAN
(m¹) (m¹) (m¹) (m¹) (m³)
0+004

1 0 + 000 0.20 0.20 0.20 0.20 10.00


0.20 0.20 7.50 7.50 1.50 4.00 6.00
2 0 + 004 0.20 0.20 0.20 0.20 5.00
0.20 0.20 5.00 5.00 1.00 21.00 21.00
3 0 + 025 0.20 0.20 0.20 0.20 5.00
0.20 0.20 5.00 5.00 1.00 25.00 25.00
4 0 + 050 0.20 0.20 0.20 0.20 5.00
0.20 0.20 5.00 5.00 1.00 25.00 25.00
5 0 + 075 0.20 0.20 0.20 0.20 5.00
0.20 0.20 5.00 5.00 1.00 25.00 25.00
6 0 + 100 0.20 0.20 0.20 0.20 5.00
0.20 0.20 5.00 5.00 1.00 25.00 25.00
7 0 + 125 0.20 0.20 0.20 0.20 5.00
0.20 0.20 5.00 5.00 1.00 25.00 25.00
8 0 + 150 0.20 0.20 0.20 0.20 5.00
0.20 0.20 5.00 5.00 1.00 25.00 25.00
9 0 + 175 0.20 0.20 0.20 0.20 5.00
0.20 0.20 5.00 5.00 1.00 25.00 25.00
10 0 + 200 0.20 0.20 0.20 0.20 5.00
0.20 0.20 5.00 5.00 1.00 25.00 25.00
11 0 + 225 0.20 0.20 0.20 0.20 5.00
0.20 0.20 5.00 5.00 1.00 25.00 25.00
12 0 + 250 0.20 0.20 0.20 0.20 5.00
0.20 0.20 5.00 5.00 1.00 25.00 25.00
13 0 + 275 0.20 0.20 0.20 0.20 5.00
0.20 0.20 5.00 5.00 1.00 19.00 19.00
14 0 + 294 0.20 0.20 0.20 0.20 5.00
0.20 0.20 4.50 4.50 0.90 6.00 5.40
15 0 + 300 0.20 0.20 0.20 0.20 4.00
0.20 0.20 4.00 4.00 0.80 25.00 20.00
16 0 + 325 0.20 0.20 0.20 0.20 4.00
0.20 0.20 4.00 4.00 0.80 25.00 20.00
17 0 + 350 0.20 0.20 0.20 0.20 4.00
0.20 0.20 4.00 4.00 0.80 25.00 20.00
18 0 + 375 0.20 0.20 0.20 0.20 4.00
0.20 0.20 4.00 4.00 0.80 10.00 8.00
19 0 + 385 0.20 0.20 0.20 0.20 4.00
0.20 0.20 3.75 3.75 0.75 15.00 11.25
20 0 + 400 0.20 0.20 0.20 0.20 3.50
0.20 0.20 3.50 3.50 0.70 25.00 17.50
21 0 + 425 0.20 0.20 0.20 0.20 3.50
0.20 0.20 3.50 3.50 0.70 25.00 17.50
22 0 + 450 0.20 0.20 0.20 0.20 3.50
0.20 0.20 3.50 3.50 0.70 25.00 17.50
23 0 + 475 0.20 0.20 0.20 0.20 3.50
0.20 0.20 3.50 3.50 0.70 11.00 7.70
24 0 + 486 0.20 0.20 0.20 0.20 3.50
0.20 0.20 3.05 3.05 0.61 8.00 4.88
25 0 + 494 0.20 0.20 0.20 0.20 2.60
0.20 0.20 2.60 2.60 0.52 6.00 3.12
26 0 + 500 0.20 0.20 0.20 0.20 2.60
0.20 0.20 2.60 2.60 0.52 17.00 8.84
27 0 + 517 0.20 0.20 0.20 0.20 2.60

TOTAL 517.00 457.69

DISETUJUI OLEH, DIPERIKSA OLEH DIBUAT OLEH


PENGAWAS LAPANGAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
DPU-PR BIDANG BINA MARGA CV. BUNGA BORNEO KONSULTAN CV. KARYA ARUMI IRSANDI

1. MUHAMMAD SA'I : ……………………………..

ANUGRAH KOMBONG, ST EKO BUDI PRABOWO, ST


2. NANDA PUTRI LESTARI, ST : …………………………….. SITE ENGINEER PELAKSANA LAPANGAN
BACK UP DATA VOLUME
PERKERASAN BETON SEMEN (OPC) FC'20 Mpa

PROGRAM : PENYELENGGARAAN JALAN


KEGIATAN : PENYELENGGARAAN JALAN KABUPATEN/KOTA
SUB KEGIATAN : REKONTRUKSI JALAN
PEKERJAAN : PENINGKATAN JALAN RT.28 KELURAHAN WARU KECAMATAN WARU (BANKEU TA.2022)
LOKASI : KEC. WARU

SKETSA GAMBAR LINK 2

TEBAL
TEBAL TEBAL LEBAR LEBAR PANJANG VOLUME
NO STA KIRI TENGAH KANAN LEBAR LUAS KETERANGAN
RATA-RATA RATA-RATA DIBAYARKAN RATA-RATA DIBAYARKAN
(m¹) (m¹) (m¹) (m¹) (m³)

1 0+ 000 0.20 0.20 0.20 0.20 4.50


0.20 0.20 4.50 4.50 0.90 25.00 22.50
2 0+ 025 0.20 0.20 0.20 0.20 4.50
0.20 0.20 4.50 4.50 0.90 25.00 22.50
3 0+ 050 0.20 0.20 0.20 0.20 4.50
0.20 0.20 4.50 4.50 0.90 25.00 22.50
4 0+ 075 0.20 0.20 0.20 0.20 4.50

TOTAL 75.00 67.50

DISETUJUI OLEH, DIPERIKSA OLEH DIBUAT OLEH


PENGAWAS LAPANGAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
DPU-PR BIDANG BINA MARGA CV. BUNGA BORNEO KONSULTAN CV. KARYA ARUMI IRSANDI

1. MUHAMMAD SA'I : ……………………………..

ANUGRAH KOMBONG, ST EKO BUDI PRABOWO, ST


2. NANDA PUTRI LESTARI, ST : …………………………….. SITE ENGINEER PELAKSANA LAPANGAN
BACK UP DATA VOLUME
PERKERASAN BETON SEMEN (OPC) FC'20 Mpa

PROGRAM : PENYELENGGARAAN JALAN


KEGIATAN : PENYELENGGARAAN JALAN KABUPATEN/KOTA
SUB KEGIATAN : REKONTRUKSI JALAN
PEKERJAAN : PENINGKATAN JALAN RT.28 KELURAHAN WARU KECAMATAN WARU (BANKEU TA.2022)
LOKASI : KEC. WARU

SKETSA GAMBAR LINK 3

TEBAL
TEBAL TEBAL LEBAR LEBAR PANJANG VOLUME
NO STA KIRI TENGAH KANAN LEBAR LUAS KETERANGAN
RATA-RATA RATA-RATA DIBAYARKAN RATA-RATA DIBAYARKAN
(m¹) (m¹) (m¹) (m¹) (m³)

1 0+ 000 0.20 0.20 0.20 0.20 4.50


0.20 0.20 4.50 4.50 0.90 25.00 22.50
2 0+ 025 0.20 0.20 0.20 0.20 4.50
0.20 0.20 4.50 4.50 0.90 25.00 22.50
3 0+ 050 0.20 0.20 0.20 0.20 4.50
0.20 0.20 4.50 4.50 0.90 25.00 22.50
4 0+ 075 0.20 0.20 0.20 0.20 4.50
0.20 0.20 4.50 4.50 0.90 25.00 22.50
5 0+ 100 0.20 0.20 0.20 0.20 4.50
0.20 0.20 4.50 4.50 0.90 2.00 1.80
6 0+ 102 0.20 0.20 0.20 0.20 4.50

TOTAL 102.00 91.80

DISETUJUI OLEH, DIPERIKSA OLEH DIBUAT OLEH


PENGAWAS LAPANGAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
DPU-PR BIDANG BINA MARGA CV. BUNGA BORNEO KONSULTAN CV. KARYA ARUMI IRSANDI

1. MUHAMMAD SA'I : ……………………………..

ANUGRAH KOMBONG, ST EKO BUDI PRABOWO, ST


2. NANDA PUTRI LESTARI, ST : …………………………….. SITE ENGINEER PELAKSANA LAPANGAN
BACK UP DATA VOLUME
GALIAN BIASA (MANUAL)

PROGRAM : PENYELENGGARAAN JALAN


KEGIATAN : PENYELENGGARAAN JALAN KABUPATEN/KOTA
SUB KEGIATAN : REKONTRUKSI JALAN
PEKERJAAN : PENINGKATAN JALAN RT.28 KELURAHAN WARU KECAMATAN WARU (BANKEU TA.2022)
LOKASI : KEC. WARU

SKETSA GAMBAR
A

DIMENSI LUAS
LUAS PANJANG VOLUME GALIAN
NO STA A B RATA-RATA

LEBAR TINGGI KANAN TINGGI KIRI M2 M2 .M M3

1 0 + 0.00 1.90 0.75 0.65 1.33


1.33 4.50 5.99
2 0 + 4.50 1.90 0.75 0.65 1.33

TOTAL VOLUME GALIAN BIASA (MANUAL) 5.99

DISETUJUI OLEH, DIPERIKSA OLEH DIBUAT OLEH


PENGAWAS LAPANGAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
DPU-PR BIDANG BINA MARGA CV. BUNGA BORNEO KONSULTAN CV. KARYA ARUMI IRSANDI

1. MUHAMMAD SA'I : ……………………………..


ANUGRAH KOMBONG, ST EKO BUDI PRABOWO, ST
2. NANDA PUTRI LESTARI, ST : …………………………….. SITE ENGINEER PELAKSANA LAPANGAN
BACK UP DATA VOLUME
BETON STRUKTUR, FC'20 MPa

PROGRAM : PENYELENGGARAAN JALAN


KEGIATAN : PENYELENGGARAAN JALAN KABUPATEN/KOTA
SUB KEGIATAN : REKONTRUKSI JALAN
PEKERJAAN : PENINGKATAN JALAN RT.28 KELURAHAN WARU KECAMATAN WARU (BANKEU TA.2022)
LOKASI : KEC. WARU

SKETSA GAMBAR

VOLUME REALISASI

NO URAIAN PANJANG LEBAR TINGGI VOLUME KETERANGAN

1 LANTAI SLAB BETON 4.95 2.00 0.20 1.98

TOTAL VOLUME BETON STRUKTUR FC'20 Mpa 1.98

VOLUME TERBAYAR

NO URAIAN PANJANG LEBAR TINGGI VOLUME KETERANGAN

1 LANTAI SLAB BETON 4.00 1.60 0.20 1.28

TOTAL VOLUME BETON STRUKTUR FC'20 Mpa 1.28

DISETUJUI OLEH, DIPERIKSA OLEH DIBUAT OLEH


PENGAWAS LAPANGAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
DPU-PR BIDANG BINA MARGA CV. BUNGA BORNEO KONSULTAN CV. KARYA ARUMI IRSANDI

1. MUHAMMAD SA'I : ……………………

ANUGRAH KOMBONG, ST EKO BUDI PRABOWO, ST


2. NANDA PUTRI LESTARI, ST : …………………… SITE ENGINEER PELAKSANA LAPANGAN
BACK UP DATA VOLUME
BAJA TULANGAN POLOS - BJTP 280

PROGRAM : PENYELENGGARAAN JALAN DATA SLAB CULVERT


KEGIATAN : PENYELENGGARAAN JALAN KABUPATEN/KOTA Panjang = 4.50 m
SUB KEGIATAN : REKONTRUKSI JALAN Lebar = 2.00 m
PEKERJAAN : PENINGKATAN JALAN RT.28 KELURAHAN WARU KECAMATAN WARU (BANKEU TA.2022) Tebal = 0.20 m
LOKASI : KEC. WARU

Ø Selimut Dimensi ( m ) Pnj/Buah Total Berat/m Jumlah Berat Total


BENTUK TULANGAN Jarak Jumlah Keterangan
( mm ) Beton a b c d e Kait 1 Kait 2 (m) Batang Panjang ( kg ) Pembesian ( kg )

b
TULANGAN POKOK
a c 12 0.15 0.025 0.15 1.95 0.15 1.95 0.025 0.025 4.25 27.00 114.75 0.8878 1.00 101.87
(VERTIKAL)
d

a 10 0.20 0.025 4.45 0.025 0.025 4.50 9.00 40.50 0.6165 2.00 49.94 TULANGAN BAGI

a c 12 0.30 0.63 0.25 0.63 0.025 0.025 1.55 13.00 20.15 0.8878 2.00 35.78 ANGKUR (KANAN KIRI)

BERAT TOTAL BAJA TULANGAN POLOS - BJTP 280 187.58

DISETUJUI OLEH, DIPERIKSA OLEH DIBUAT OLEH


PENGAWAS LAPANGAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
DPU-PR BIDANG BINA MARGA CV. BUNGA BORNEO KONSULTAN CV. KARYA ARUMI IRSANDI

1. MUHAMMAD SA'I : ……………………………..

ANUGRAH KOMBONG, ST EKO BUDI PRABOWO, ST


2. NANDA PUTRI LESTARI, ST : …………………………….. SITE ENGINEER PELAKSANA LAPANGAN
BACK UP DATA VOLUME
PONDASI CERUCUK, PENYEDIAN DAN PEMANCANGAN

PROGRAM : PENYELENGGARAAN JALAN


KEGIATAN : PENYELENGGARAAN JALAN KABUPATEN/KOTA
SUB KEGIATAN : REKONTRUKSI JALAN
PEKERJAAN : PENINGKATAN JALAN RT.28 KELURAHAN WARU KECAMATAN WARU (BANKEU TA.2022)
LOKASI : KEC. WARU

SKETSA GAMBAR

PANJANG GALAM JARAK


NO STA PANJANG PASANGAN BATU JUMLAH TITIK PANCANG JUMLAH SISI VOLUME
PERTITIK ANTAR TITIK

1 0 + 0.00
2.00 0.50 4.50 9.00 2.00 36.00
2 0 + 4.50

TOTAL VOLUME PANCANG GALAM 36.00

DISETUJUI OLEH, DIPERIKSA OLEH DIBUAT OLEH


PENGAWAS LAPANGAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
DPU-PR BIDANG BINA MARGA CV. BUNGA BORNEO KONSULTAN CV. KARYA ARUMI IRSANDI

1. MUHAMMAD SA'I : ……………………

ANUGRAH KOMBONG, ST EKO BUDI PRABOWO, ST


2. NANDA PUTRI LESTARI, ST : …………………… SITE ENGINEER PELAKSANA LAPANGAN
BACK UP DATA VOLUME
PASANGAN BATU

PROGRAM : PENYELENGGARAAN JALAN


KEGIATAN : PENYELENGGARAAN JALAN KABUPATEN/KOTA
SUB KEGIATAN : REKONTRUKSI JALAN
PEKERJAAN : PENINGKATAN JALAN RT.28 KELURAHAN WARU KECAMATAN WARU (BANKEU TA.2022)
LOKASI : KEC. WARU

SKETSA GAMBAR

VOLUME REALISASI
PONDASI ATAS LANTAI LUAS KIRI LUAS KANAN LUAS LANTAI
LUAS TOTAL LUAS RATA-RATA PANJANG VOLUME
(A) (B) (C)
STA KIRI KANAN L T
(m²) (m²) (m²) (m²) (m²) (m') (m³)
a b c d e f g h A=((a+b)/2) x c B=((d+e)/2)xf C=gxh A+B+C Luas Rata"x Jarak

0 + 0 0.25 0.44 0.65 0.25 0.30 0.75 1.16 0.15 0.22 0.21 0.29 0.72
0.72 4.50 3.22
0 + 4.5 0.25 0.44 0.65 0.25 0.30 0.75 1.16 0.15 0.22 0.21 0.29 0.72

TOTAL VOLUME PASANGAN BATU (REALISASI) 3.22

VOLUME TERBAYAR
PONDASI ATAS LANTAI LUAS KIRI LUAS KANAN LUAS LANTAI
LUAS TOTAL LUAS RATA-RATA LUAS RATA-RATA VOLUME
(A) (B) (C)
STA KIRI KANAN L T
(m²) (m²) (m²) (m²) (m²) (m²) (m³)
a b c d e f g h A=((a+b)/2) x c B=((d+e)/2)xf C=gxh A+B+C Luas Rata"x Jarak

0 + 0 0.25 0.44 0.65 0.25 0.30 0.75 1.16 0.15 0.22 0.21 0.29 0.72
0.72 4.50 3.22
0 + 4.5 0.25 0.44 0.65 0.25 0.30 0.75 1.16 0.15 0.22 0.21 0.29 0.72

TOTAL VOLUME PASANGAN BATU (TERBAYAR) 3.22

DISETUJUI OLEH, DIPERIKSA OLEH DIBUAT OLEH


PENGAWAS LAPANGAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
DPU-PR BIDANG BINA MARGA CV. BUNGA BORNEO KONSULTAN CV. KARYA ARUMI IRSANDI

1. MUHAMMAD SA'I : ……………………………..

ANUGRAH KOMBONG, ST EKO BUDI PRABOWO, ST


2. NANDA PUTRI LESTARI, ST : …………………………….. SITE ENGINEER PELAKSANA LAPANGAN

Anda mungkin juga menyukai