PEKERJAAN STRUKTUR
II.1 PEKERJAAN STRUKTUR BAWAH
II.1.1 PEKERJAAN PONDASI
II.1.1.1 Pondasi Bore Pile (P1)
II.1.1.2 Pondasi Bore Pile (P2)
1. Pekerjaan Pengeboran Tanah Diameter 80 cm

Kuantitas = 1/4 x 3,14 x d^2 X t x n = 118.692 m3


Diameter = 0.80 m
Tinggi (t) = 10.25 m
Jumlah Titik (n) = 33.00 ttk

2. Pembesian Bore Pile


Pembesian Ø22 - 17
Kuantitas = = 435.90 Kg

Diameter (D) = 0.22 m


Tinggi (h) = 8.00 m
Jarak Antar Begel (h1) = 0.17 m
Berat Jenis Ø8 (BJ) = 0.395 kg/m
Jumlah Titik (n) = 33.00 ttk

Pembesian 14 D 22
Kuantitas = BJ x t x n = 5125.903 Kg
Tinggi (t) = 7.03 m
Jumlah Batang (n') = 14 btg
Jumlah Titik (n) = 33 ttk
Berat Jenis D16 (BJ) = 1.578

3. Beton Bore Pile K-300


Kuantitas = 1/4 x 3,14 x d^2 x t x n = 134.789 m3
Tinggi (t) = 8.13 m
Diameter = 0.80 m
Jumlah Titik (n) = 33.00 ttk

4. Pekerjaan Poer Beton Bertulang


Galian Poer
Kuantitas = pxlxtxn = 44.19 m2
Panjang (p) = 1.20 m
Lebar (l) = 1.20 m
Tinggi (t) = 0.93 m
Jumlah Titik (n) = 33.00 ttk

Urugan Pasir
Kuantitas = pxlxtxn = 2.376 m2
Panjang (p) = 1.20 m
Lebar (l) = 1.20 m
Tinggi (t) = 0.05 m
Jumlah Titik (n) = 33.00 ttk

Lantai Kerja Beton K-100


Kuantitas = pxlxtxn = 3.802 m2
Panjang (p) = 1.20 m
Lebar (l) = 1.20 m
Tinggi (t) = 0.08 m
Jumlah Titik (n) = 33.00 ttk

Pembesian Poer 6 D 16
Kuantitas = BJ x p x n' x n = 1699.954 Kg
Panjang (p) = 2.72 m
Jumlah Batang (n') = 12.00 btg
Jumlah Titik (n) = 33.00 ttk
Berat Jenis D16 (BJ) = 1.578
Bekisting Poer Beton
Kuantitas = p x l x Jml sisi x n = 1351.680 m2
Panjang (p) = 3.20 m
Lebar (l) = 3.20 m
Jumlah Sisi = 4.00 sisi
Jumlah Titik (n) = 33.00 ttk

Beton Poer K-300


Kuantitas = pxlxtxn = 135.168 m3
Panjang (p) = 3.20 m
Lebar (l) = 3.20 m
Tinggi (t) = 0.40 m
Jumlah Titik (n) = 33.00 ttk

Timbunan Tanah Bekas Galian


Kuantitas = (0,8 x 1,2) - Vol. Poer = -103.488 m3
Vol. Poer = 135.17
Jumlah Titik (n) = 33.00 ttk

1. Pekerjaan Pengeboran Tanah Diameter 80 cm

Kuantitas = 1/4 x 3,14 x d^2 X t x n = 118.692 m3


Diameter = 0.80 m
Tinggi (t) = 9.90 m
Jumlah Titik (n) = 27.00 ttk
2. Pembesian Bore Pile
Pembesian Ø22 - 17
Kuantitas = = 356.65 Kg

Diameter (D) = 0.22 m


Tinggi (h) = 8.00 m
Jarak Antar Begel (h1) = 0.17 m
Berat Jenis Ø8 (BJ) = 0.395 kg/m
Jumlah Titik (n) = 27.00 ttk

Pembesian 14 D 22
Kuantitas = BJ x t x n = 4193.920 Kg
Tinggi (t) = 7.03 m
Jumlah Batang (n') = 14 btg
Jumlah Titik (n) = 27 ttk
Berat Jenis D16 (BJ) = 1.578

3. Beton Bore Pile K-300


Kuantitas = 1/4 x 3,14 x d^2 x t x n = 110.282 m3
Tinggi (t) = 8.13 m
Diameter = 0.80 m
Jumlah Titik (n) = 27.00 ttk

4. Pekerjaan Poer Beton Bertulang


Galian Poer
Kuantitas = pxlxtxn = 36.16 m2
Panjang (p) = 1.20 m
Lebar (l) = 1.20 m
Tinggi (t) = 0.93 m
Jumlah Titik (n) = 27.00 ttk

Urugan Pasir
Kuantitas = pxlxtxn = 1.944 m2
Panjang (p) = 1.20 m
Lebar (l) = 1.20 m
Tinggi (t) = 0.05 m
Jumlah Titik (n) = 27.00 ttk

Lantai Kerja Beton K-100


Kuantitas = pxlxtxn = 3.110 m2
Panjang (p) = 1.20 m
Lebar (l) = 1.20 m
Tinggi (t) = 0.08 m
Jumlah Titik (n) = 27.00 ttk
Pembesian Poer 6 D 16
Kuantitas = BJ x p x n' x n = 1431.779 Kg
Panjang (p) = 2.80 m
Jumlah Batang (n') = 12.00 btg
Jumlah Titik (n) = 27.00 ttk
Berat Jenis D16 (BJ) = 1.578
Bekisting Poer Beton
Kuantitas = p x l x Jml sisi x n = 846.720 m2
Panjang (p) = 2.80 m
Lebar (l) = 2.80 m
Jumlah Sisi = 4.00 sisi
Jumlah Titik (n) = 27.00 ttk

Beton Poer K-300


Kuantitas = pxlxtxn = 84.672 m3
Panjang (p) = 2.80 m
Lebar (l) = 2.80 m
Tinggi (t) = 0.40 m
Jumlah Titik (n) = 27.00 ttk

Timbunan Tanah Bekas Galian


Kuantitas = (0,8 x 1,2) - Vol. Poer = -58.752 m3
Vol. Poer = 84.67
Jumlah Titik (n) = 27.00 ttk
BERA
T
NO. URAIAN PEKERJAAN SKETSA ɸ (cm) (Kg/m)

w
II.1.2 PEKERJAAN SLOOF
II.1.2.1 Sloof Type S1
Bentang 6 m
Pekerjaan Galian dan Lantai Kerja GALIAN

PASIR URUG

L. KERJA K-100

Pekerjaan Beton dan Bekisting

BETON K-225

KAYU 5/7

KAYU 4/6 l

KAYU 4/6 -

Mlt. 9 mm
Pekerjaan Besi
T. POKOK 1.6 1.58

T. SENGKANG 1.0 0.62

Tulangan Po 0,2 + 40D+5,6+40D=6,88


2 + 0,2 - 0,08 = 2,32
(6 D16) 5d 5d

URUGAN
Sengkang :
Tumpuan(ɸ10 - 10)
Lapangan(ɸ10 - 15)

Bentang 5 m GALIAN
Pekerjaan Beton dan Bekisting
PASIR URUG

L. KERJA K-100

BETON K-225

KAYU 5/7

KAYU 4/6 l

KAYU 4/6 -

Mlt. 9 mm
0,2 +40D+4,6+40D=5,88
2 + 0,2 - 0,08 = 2,32
5d 5d

Pekerjaan Besi T. POKOK 1.6 1.58


Tulangan Pokok (6D16)

Sengkang :
Tumpuan(ɸ10 - 10) T. SENGKANG 1.0 0.62
Lapangan(ɸ10 - 15)

URUGAN

GALIAN
Pekerjaan Beton dan Bekisting
PASIR URUG

L. KERJA K-100

BETON K-225

KAYU 5/7

KAYU 4/6 l

KAYU 4/6 -
Mlt. 9 mm

0,2 +40D+4,5+40D=5,78
2 + 0,2 - 0,08 = 2,32
5d 5d

Pekerjaan Besi T. POKOK 1.6 1.58


Tulangan Pokok (6D16)

Sengkang :
Tumpuan(ɸ10 - 10) T. SENGKANG 1.0 0.62
Lapangan(ɸ10 - 15)

URUGAN

Bentang 7 m GALIAN
Pekerjaan Beton dan Bekisting
PASIR URUG

L. KERJA K-100
BETON K-225

KAYU 5/7

KAYU 4/6 l

KAYU 4/6 -

Mlt. 9 mm

40D+6,5+40D=7,78
0,2 + 2 + 0,2 - 0,08 = 2,32
5d 5d

Pekerjaan Besi T. POKOK 1.6 1.58


Tulangan Pokok (6D16)

Sengkang :
Tumpuan(ɸ10 - 10) T. SENGKANG 1.0 0.62
Lapangan(ɸ10 - 15)

URUGAN

Bentang 3 m GALIAN
Pekerjaan Beton dan Bekisting
PASIR URUG

L. KERJA K-100

BETON K-225

KAYU 5/7

KAYU 4/6 l

KAYU 4/6 -

Mlt. 9 mm

0,2 +40D+2,6+40D=3,88
2 + 0,2 - 0,08 = 2,32
5d 5d

Pekerjaan Besi T. POKOK 1.6 1.58


Tulangan Pokok (6D16)

Sengkang :
Tumpuan(ɸ10 - 10) T. SENGKANG 1.0 0.62
Lapangan(ɸ10 - 15)

URUGAN
Bentang 4 m GALIAN
Pekerjaan Beton dan Bekisting
PASIR URUG

L. KERJA K-100

BETON K-225

KAYU 5/7

KAYU 4/6 l

KAYU 4/6 -

Mlt. 9 mm

0,2 +40D+3,6+40D=4,88
2 + 0,2 - 0,08 = 2,32
5d 5d

Pekerjaan Besi T. POKOK 1.6 1.58


Tulangan Pokok (6D16)
Sengkang :
Tumpuan(ɸ10 - 10) T. SENGKANG 1.0 0.62
Lapangan(ɸ10 - 15)

URUGAN

GALIAN
Pekerjaan Beton dan Bekisting
PASIR URUG

L. KERJA K-100

BETON K-225

KAYU 5/7

KAYU 4/6 l

KAYU 4/6 -

Mlt. 9 mm
0,2 +40D+3,6+40D=4,88
2 + 0,2 - 0,08 = 2,32
5d 5d

Pekerjaan Besi T. POKOK 1.6 1.58


Tulangan Pokok (6D16)

Sengkang :
Tumpuan(ɸ10 - 10) T. SENGKANG 1.0 0.62
Lapangan(ɸ10 - 15)

URUGAN

GALIAN
Pekerjaan Beton dan Bekisting
PASIR URUG

L. KERJA K-100

BETON K-225

KAYU 5/7

KAYU 4/6 l

KAYU 4/6 -

Mlt. 9 mm
40D+3,55+40D=4,83
0,2 + 2 + 0,2 - 0,08 = 2,32
5d 5d

Pekerjaan Besi T. POKOK 1.6 1.58


Tulangan Pokok (6D16)

Sengkang :
Tumpuan(ɸ10 - 10) T. SENGKANG 1.0 0.62
Lapangan(ɸ10 - 15)

URUGAN

Bentang 4,7 m GALIAN


Pekerjaan Beton dan Bekisting
PASIR URUG

L. KERJA K-100

BETON K-225

KAYU 5/7
KAYU 4/6 l

KAYU 4/6 -

Mlt. 9 mm

40D+4,3+40D=5,58
0,2 + 2 + 0,2 - 0,08 = 2,32
5d 5d

Pekerjaan Besi T. POKOK 1.6 1.58


Tulangan Pokok (6D16)

Sengkang :
Tumpuan(ɸ10 - 10) T. SENGKANG 1.0 0.62
Lapangan(ɸ10 - 15)

URUGAN

Bentang 2 m GALIAN
Pekerjaan Beton dan Bekisting
PASIR URUG

L. KERJA K-100

BETON K-225
KAYU 5/7

KAYU 4/6 l

KAYU 4/6 -

Mlt. 9 mm

0,2 +40D+1,55+40D=2,83
2 + 0,2 - 0,08 = 2,32
5d 5d

Pekerjaan Besi T. POKOK 1.6 1.58


Tulangan Pokok (6D16)

Sengkang :
Tumpuan(ɸ10 - 10) T. SENGKANG 1.0 0.62
Lapangan(ɸ10 - 15)

URUGAN

REKAP UNTUK SLOOF TYPE S1

II.1.2.2 Sloof Type S2


Pekerjaan Beton dan Bekisting

BETON K-225

KAYU 5/7

KAYU 4/6 l

KAYU 4/6 -

Mlt. 9 mm

Pekerjaan Besi
T. POKOK 1 0.617

T. SENGKANG 0.8 0.39

Tulangan Pokok
(6 D16)
URUGAN
Sengkang :
Tumpuan(ɸ10 - 10)
Lapangan(ɸ10 - 15)

REKAP UNTUK SLOOF TYPE S2


DIMENSI
JML
GALIAN PASIR BERAT BESI KUANTITAS KUANTITAS
POTONG/UN LANTAI KERJA
pjg (m) lbr (m) tgg (m) IT TANAH URUG (Kg) BETON (M3) BEKISTING (M2)
K-100 (M3)
(M3) (M3)

p l t n pxlxtpxlxtxn pxlxtxn wxpxn p x l x t x n p x t x n x 2sisi

5.6 0.45 0.53 24 32.054

5.6 0.45 0.05 24 3.024

5.6 0.45 0.08 24 4.8384

5.60 0.25 0.4 24 13.44 53.760

5.6 0.05 0.07 144 2.822

0.4 0.04 0.06 576 0.553

0.45 0.04 0.06 144 0.156

5.6 0.009 0.4 48 107.520


6.88 6 65.15

1.08 29 19.31
19 12.43
total =
31.74

TOTAL = 2325.29
4.6 0.45 0.53 19 20.845

4.6 0.45 0.05 19 1.9665

4.6 0.45 0.08 19 3.1464

4.60 0.25 0.4 19 8.74 69.920

4.6 0.05 0.07 114 1.835

4.6 0.04 0.06 380 4.195

4.6 0.04 0.06 95 1.049

4.6 0.009 0.07 38 12.236


5.88 6 55.68

1.08 24 15.98
15 10.21
total =
26.19

TOTAL = 1555.52
4.5 0.45 0.53 6 6.440

4.5 0.45 0.05 6 0.6075

4.5 0.45 0.08 6 0.972

4.50 0.25 0.4 6 2.7 21.600

4.5 0.05 0.07 36 0.567

4.5 0.04 0.06 120 1.296

4.5 0.04 0.06 30 0.324


4.5 0.009 0.07 12 3.780

5.78 6 54.73

1.08 23.5 15.65


15 9.99
total =
25.63

TOTAL = 482.20
6.5 0.45 0.53 6 9.302

6.5 0.45 0.05 6 0.8775

6.5 0.45 0.08 6 1.404


6.50 0.25 0.4 6 3.9 31.200

6.5 0.05 0.07 36 0.819

6.5 0.04 0.06 168 2.621

6.5 0.04 0.06 42 0.655

6.5 0.009 0.07 12 5.460

7.78 6 73.67

1.08 33.5 22.30


22 14.43
total =
36.73

TOTAL = 662.42
2.6 0.45 0.53 3 1.860
2.6 0.45 0.05 3 0.1755

2.6 0.45 0.08 3 0.2808

2.60 0.25 0.4 3 0.78 6.240

2.6 0.05 0.07 18 0.164

2.6 0.04 0.06 36 0.225

2.6 0.04 0.06 9 0.056

2.6 0.009 0.07 6 1.092

3.88 6 36.74

1.08 14 9.32
9 5.77
total =
15.09
TOTAL = 155.50
3.6 0.45 0.53 3 2.576

3.6 0.45 0.05 3 0.243

3.6 0.45 0.08 3 0.3888

3.60 0.25 0.4 3 1.08 8.640

3.6 0.05 0.07 18 0.227

3.6 0.04 0.06 48 0.415

3.6 0.04 0.06 12 0.104

3.6 0.009 0.07 6 1.512

4.88 6 46.21
1.08 19 12.65
12 7.99
total =
20.64

TOTAL = 200.55
3.6 0.45 0.53 3 2.576

3.6 0.45 0.05 3 0.243

3.6 0.45 0.08 3 0.3888

3.60 0.25 0.4 3 1.08 8.640

3.6 0.05 0.07 18 0.227

3.6 0.04 0.06 48 0.415

3.6 0.04 0.06 12 0.104

3.6 0.009 0.07 6 1.512


4.88 6 46.21

1.08 19 12.65
12 7.99
total =
20.64

TOTAL = 200.55
3.55 0.45 0.53 2 1.693

3.55 0.45 0.05 2 0.15975

3.55 0.45 0.08 2 0.2556

3.55 0.25 0.4 2 0.71 5.680

3.55 0.05 0.07 12 0.149

3.55 0.04 0.06 32 0.273

3.55 0.04 0.06 8 0.068

3.55 0.009 0.07 4 0.994


4.83 6 45.74

1.08 18.75 12.48


12 7.88
total =
20.36

TOTAL = 132.20
4.3 0.45 0.53 18 18.460

4.3 0.45 0.05 18 1.7415

4.3 0.45 0.08 18 2.7864

4.30 0.25 0.4 18 7.74 61.920

4.3 0.05 0.07 108 1.625


4.3 0.04 0.06 324 3.344

4.3 0.04 0.06 90 0.929

4.3 0.009 0.07 36 10.836

5.58 6 52.84

1.08 22.5 14.98


14 9.54
total =
24.52

TOTAL = 1392.55
1.55 0.45 0.53 3 1.109

1.55 0.45 0.05 3 0.104625

1.55 0.45 0.08 3 0.1674

1.55 0.25 0.4 3 0.465 3.720


1.55 0.05 0.07 18 0.098

1.55 0.04 0.06 24 0.089

1.55 0.04 0.06 6 0.022

1.55 0.009 0.07 6 0.651

2.83 6 26.80

1.08 8.75 5.83


5 3.44
total =
9.27

TOTAL = 108.19
GALIAN PASIR L. KERJA BESI BETON BEKISTING
96.91448 9.142875 14.6286 7214.98 40.64 271.32
= 0.15 0.2 #VALUE! #VALUE!

= 0.05 0.07 #VALUE!

= 0.04 0.06 #VALUE!

0.35 0.04 0.06 0.001

= 0.009 0.2 #VALUE!

### #VALUE!

0.48 #VALUE! #VALUE!


#VALUE! #VALUE!
total =
#VALUE!

TOTAL = #VALUE!
BESI BETON BEKISTING
PE S2
#VALUE! #VALUE! #VALUE!
KUANTITAS
URUG (M3)
BEKISTING (M2)

p x t x n x 2sisi G-(P.U+L.K+B)

M2

M3

M3

M3

M3
10.752

M2

M3

M3

M3

M3
6.992

M2

M3

M3

M3
M3

2.16
M2

M3

M3

M3

M3

3.12
M2

M3

M3

M3

M3

0.624
M2

M3

M3

M3

M3
0.864

M2

M3

M3

M3

M3
0.864

M2

M3

M3

M3

M3
0.568

M2

M3
M3

M3

M3

6.192

M2
M3

M3

M3

M3

0.372

URUG
32.508
M2

M3

M3

M3

M3

#REF!

URUG
#REF!
URAIAN PEKERJAAN /
NO.
SKETSA
STRUKTUR
PEKERJAAN KOLOM LT.1
1. Kolom Type K1
1 Beton

2 Pembesian
Sengkang

Tulangan Pokok (32D25)

3 Bekisting

2. Kolom Type KP
1 Beton

2 Pembesian
Sengkang

Tulangan Pokok (4D12)

3 Bekisting

PEKERJAAN KOLOM LT.2


1. Kolom Type K1

1 Beton
2 Pembesian
Sengkang

Tulangan Pokok (32D25)

3 Bekisting

2. Kolom Type KP

1 Beton

2 Pembesian
Sengkang
Tulangan Pokok (4D12)

3 Bekisting

PEKERJAAN KOLOM LT.3


1. Kolom Type K1

1 Beton

2 Pembesian
Sengkang

Tulangan Pokok (32D25)


3 Bekisting

2. Kolom Type KP

1 Beton

2 Pembesian
Sengkang

Tulangan Pokok (4D12)

3 Bekisting
PEKERJAAN KOLOM LT.4
1. Kolom Type K1

1 Beton

2 Pembesian
Sengkang

Tulangan Pokok (32D25)

3 Bekisting

2. Kolom Type KP

1 Beton
2 Pembesian
Sengkang

Tulangan Pokok (4D12)

3 Bekisting
DIMENSI
SAT KUANTITAS SAT
SIMBOL HASIL

Kuantitas = pxlxtxn = 153.27 M3


Panjang (p) = 0.70 m
Lebar (l) = 0.70 m
Tinggi (t) = 4.60 m
Jumlah (n) = 68 unit

Kuantitas = (Berat Sengkang + Tul.Pokok) x n = 37729.09 Kg


Jumlah (n) = 68 unit
Tulangan = 1.3 cm
Berat = 1.04 Kg/m
Panjang = 2.58 m
Bentang = 4.60 m
Jumlah tump = 20 pot
Jumlah lap = 16 pot
Berat sengkang = Berat x Pjg x (Jml Tump+Lap) = 97.67 Kg

Tulangan = 2.50 cm
= 0.025 m
Berat = 3.85 Kg/m
40d = 1.00 m
Panjang = 8.48 m
Jumlah pot = 14 pot
Berat tul,pokok = Berat x Pjg x Jml Pot = 457.17 Kg

Kuantitas = Luas x n = 875.84 M2


Tinggi (t) = 4.60 m
Lebar 1 (l1) = 0.70 m
Lebar 2 (l2) = 0.70 m
Jumlah (n) = 68 unit
Luas (L) = (l1 x t)x2 + (l2 x t)x2 = 12.88 M2
Kuantitas = pxlxt = 4.739 M3
Panjang (p) = 0.15 m
Lebar (l) = 0.15 m
Tinggi (t) 3.90 m
Jumlah (n) 54 unit

Kuantitas = (Berat Sengkang + Tul.Pokok) x n = 860.51 Kg


Jumlah (n) = 54 unit
Tulangan = 0.8 cm
Berat = 0.39 Kg/m
Panjang = 0.30 m
Bentang = 3.90 m
Jumlah tump = 30 pot
Jumlah lap = 14 pot
Berat sengkang = Berat x Pjg x (Jml Tump+Lap) = 5.21 Kg

Tulangan = 1.00 cm
= 0.010 m
Berat = 0.62 Kg/m
Panjang = 4.35 m
Jumlah pot = 4 pot
Berat tul,pokok = Berat x Pjg x Jml Pot = 10.73 Kg

Kuantitas = Luas x n = 126.36 M2


Tinggi (t) = 3.90 m
Lebar 1 (l1) = 0.15 m
Lebar 2 (l2) = 0.15 m
Jumlah (n) = 54 unit
Luas (L) = (l1 x t)x2 + (l2 x t)x2 = 2.34 M2

Kuantitas = pxlxtxn = 153.27 M3


Panjang (p) = 0.70 m
Lebar (l) = 0.70 m
Tinggi (t) = 4.60 m
Jumlah (n) = 68 unit
Kuantitas = (Berat Sengkang + Tul.Pokok) x n = 37729.09 Kg
Jumlah (n) = 68 unit
Tulangan = 1.3 cm
Berat = 1.04 Kg/m
Panjang = 2.58 m
Bentang = 4.60 m
Jumlah tump = 20 pot
Jumlah lap = 16 pot
Berat sengkang = Berat x Pjg x (Jml Tump+Lap) = 97.67 Kg

Tulangan = 2.50 cm
= 0.025 m
Berat = 3.85 Kg/m
40d = 1.00 m
Panjang = 8.48 m
Jumlah pot = 14 pot
Berat tul,pokok = Berat x Pjg x Jml Pot = 457.17 Kg

Kuantitas = Luas x n = 875.84 M2


Tinggi (t) = 4.60 m
Lebar 1 (l1) = 0.70 m
Lebar 2 (l2) = 0.70 m
Jumlah (n) = 68 unit
Luas (L) = (l1 x t)x2 + (l2 x t)x2 = 12.88 M2

Kuantitas = pxlxt = 6.581 M3


Panjang (p) = 0.15 m
Lebar (l) = 0.15 m
Tinggi (t) 3.90 m
Jumlah (n) 75 unit

Kuantitas = (Berat Sengkang + Tul.Pokok) x n = 1195.15 Kg


Jumlah (n) = 75 unit
Tulangan = 0.8 cm
Berat = 0.39 Kg/m
Panjang = 0.30 m
Bentang = 3.90 m
Jumlah tump = 30 pot
Jumlah lap = 14 pot
Berat sengkang = Berat x Pjg x (Jml Tump+Lap) = 5.21 Kg
Tulangan = 1.00 cm
= 0.010 m
Berat = 0.62 Kg/m
Panjang = 4.35 m
Jumlah pot = 4 pot
Berat tul,pokok = Berat x Pjg x Jml Pot = 10.73 Kg

Kuantitas = Luas x n = 126.36 M2


Tinggi (t) = 3.90 m
Lebar 1 (l1) = 0.15 m
Lebar 2 (l2) = 0.15 m
Jumlah (n) = 54 unit
Luas (L) = (l1 x t)x2 + (l2 x t)x2 = 2.34 M2

Kuantitas = pxlxtxn = 153.27 M3


Panjang (p) = 0.70 m
Lebar (l) = 0.70 m
Tinggi (t) = 4.60 m
Jumlah (n) = 68 unit

Kuantitas = (Berat Sengkang + Tul.Pokok) x n = 37729.09 Kg


Jumlah (n) = 68 unit
Tulangan = 1.3 cm
Berat = 1.04 Kg/m
Panjang = 2.58 m
Bentang = 4.60 m
Jumlah tump = 20 pot
Jumlah lap = 16 pot
Berat sengkang = Berat x Pjg x (Jml Tump+Lap) = 97.67 Kg

Tulangan = 2.50 cm
= 0.025 m
Berat = 3.85 Kg/m
40d = 1.00 m
Panjang = 8.48 m
Jumlah pot = 14 pot
Berat tul,pokok = Berat x Pjg x Jml Pot = 457.17 Kg

Kuantitas = Luas x n = 875.84 M2


Tinggi (t) = 4.60 m
Lebar 1 (l1) = 0.70 m
Lebar 2 (l2) = 0.70 m
Jumlah (n) = 68 unit
Luas (L) = (l1 x t)x2 + (l2 x t)x2 = 12.88 M2

Kuantitas = pxlxt = 7.459 M3


Panjang (p) = 0.15 m
Lebar (l) = 0.15 m
Tinggi (t) 3.90 m
Jumlah (n) 85 unit

Kuantitas = (Berat Sengkang + Tul.Pokok) x n = 1354.50 Kg


Jumlah (n) = 85 unit
Tulangan = 0.8 cm
Berat = 0.39 Kg/m
Panjang = 0.30 m
Bentang = 3.90 m
Jumlah tump = 30 pot
Jumlah lap = 14 pot
Berat sengkang = Berat x Pjg x (Jml Tump+Lap) = 5.21 Kg

Tulangan = 1.00 cm
= 0.010 m
Berat = 0.62 Kg/m
Panjang = 4.35 m
Jumlah pot = 4 pot
Berat tul,pokok = Berat x Pjg x Jml Pot = 10.73 Kg

Kuantitas = Luas x n = 126.36 M2


Tinggi (t) = 3.90 m
Lebar 1 (l1) = 0.15 m
Lebar 2 (l2) = 0.15 m
Jumlah (n) = 54 unit
Luas (L) = (l1 x t)x2 + (l2 x t)x2 = 2.34 M2
Kuantitas = pxlxtxn = 132.99 M3
Panjang (p) = 0.70 m
Lebar (l) = 0.70 m
Tinggi (t) = 4.60 m
Jumlah (n) = 59 unit

Kuantitas = (Berat Sengkang + Tul.Pokok) x n = 32735.54 Kg


Jumlah (n) = 59 unit
Tulangan = 1.3 cm
Berat = 1.04 Kg/m
Panjang = 2.58 m
Bentang = 4.60 m
Jumlah tump = 20 pot
Jumlah lap = 16 pot
Berat sengkang = Berat x Pjg x (Jml Tump+Lap) = 97.67 Kg

Tulangan = 2.50 cm
= 0.025 m
Berat = 3.85 Kg/m
40d = 1.00 m
Panjang = 8.48 m
Jumlah pot = 14 pot
Berat tul,pokok = Berat x Pjg x Jml Pot = 457.17 Kg

Kuantitas = Luas x n = 875.84 M2


Tinggi (t) = 4.60 m
Lebar 1 (l1) = 0.70 m
Lebar 2 (l2) = 0.70 m
Jumlah (n) = 68 unit
Luas (L) = (l1 x t)x2 + (l2 x t)x2 = 12.88 M2

Kuantitas = pxlxt = 7.810 M3


Panjang (p) = 0.15 m
Lebar (l) = 0.15 m
Tinggi (t) 3.90 m
Jumlah (n) 89 unit

Kuantitas = (Berat Sengkang + Tul.Pokok) x n = 1418.24 Kg


Jumlah (n) = 89 unit
Tulangan = 0.8 cm
Berat = 0.39 Kg/m
Panjang = 0.30 m
Bentang = 3.90 m
Jumlah tump = 30 pot
Jumlah lap = 14 pot
Berat sengkang = Berat x Pjg x (Jml Tump+Lap) = 5.21 Kg

Tulangan = 1.00 cm
= 0.010 m
Berat = 0.62 Kg/m
Panjang = 4.35 m
Jumlah pot = 4 pot
Berat tul,pokok = Berat x Pjg x Jml Pot = 10.73 Kg

Kuantitas = Luas x n = 126.36 M2


Tinggi (t) = 3.90 m
Lebar 1 (l1) = 0.15 m
Lebar 2 (l2) = 0.15 m
Jumlah (n) = 54 unit
Luas (L) = (l1 x t)x2 + (l2 x t)x2 = 2.34 M2
URAIAN PEKERJAAN / DIMENSI
NO.
SKETSA SIMBOL HASIL
II.2.2. PEKERJAAN BALOK LT.2
II.2.2.1.Balok Type B1

1 Beton Kuantitas = pxlxtxn


Panjang (p) = 0+9,30+9,30+9,30+9,30+9,
,30+9,30+9,30+9,30+9,30+
+9,30+9,30+9,30+9,30+9
= 54.56

Lebar (l) = 0.45


Tinggi (t) = 0.85

2 Pembesian Kuantitas = (Berat Sengkang + Tul.Pokok


Sengkang
Tulangan = 1.0
Berat = 0.39
Panjang = 3.40
Bentang = 54.56
Jumlah tump = 436
Jumlah lap = 44
Berat sengkang = Berat x Pjg x (Jml Tump+La
Tulangan Pokok (4ɸ22)
Tulangan = 2.20
= 0.022
Berat = 2.98
Panjang = 59.00
Jumlah pot = 4
Berat tul,pokok = Berat x Pjg x Jml Pot

3 Bekisting Kuantitas = Luas x n


Tinggi (t) = 0.85
Lebar (l) = 0.45
Panjang (p) = 54.56
Luas (L) = 2 x (t x p)

BESI
REKAP UNTUK BALOK TYPE B1 DI LT.2
1348.883

II.2.2.2.BalokType B2

1 Beton Kuantitas = pxlxtxn


4,30+4,30+4,30+4,30+4,30
Panjang (p) =
7+1,27+1,27+1,27+1,27+4,
4,51+4,74+4,30+4,30+4,30

= 26.08

Lebar (l) = 0.30


Tinggi (t) = 0.50

2 Pembesian Kuantitas = (Berat Sengkang + Tul.Pokok


Sengkang
Tulangan = 1.3
Berat = 1.04
Panjang = 2.40
Bentang = 26.08
Jumlah tump = 130
Jumlah lap = 101
Berat sengkang = Berat x Pjg x (Jml Tump+La
Tulangan Pokok (7ɸ19)
Tulangan = 1.00
= 0.010
Berat = 0.62
Panjang = 30.42
Jumlah pot = 4
Berat tul,pokok = Berat x Pjg x Jml Pot

3 Bekisting Kuantitas = Luas x n


Tinggi (t) = 0.50
Lebar (l) = 0.30
Panjang (p) = 26.08
Luas (L) = 2 x (t x p)
BESI
REKAP UNTUK BALOK TYPE B2 DI LT.2
653.470

II.2.2.3.BalokType B3

1 Beton Kuantitas = pxlxtxn


4,55+4,55+4,55+4,55+4,55
Panjang (p) = 5+4,55+4,55+4,55+4,65+4,
4,55+4,55+4,55+4,55+4,55
5+4,55+4,55+4,55+4,55+4,
5+4,55+4,55+4,55+4,55+4,
4,55+4,55+4,55+4,55+
+4,65+4,65+4,65+4,65+4,6
= 26.08

Lebar (l) = 0.30


Tinggi (t) = 0.45

2 Pembesian Kuantitas = (Berat Sengkang + Tul.Pokok


Sengkang
Tulangan = 1.3
Berat = 1.04
Panjang = 2.40
Bentang = 26.08
Jumlah tump = 130
Jumlah lap = 101
Berat sengkang = Berat x Pjg x (Jml Tump+La
Tulangan Pokok (5ɸ16)
Tulangan = 1.00
= 0.010
Berat = 0.62
Panjang = 30.42
Jumlah pot = 4
Berat tul,pokok = Berat x Pjg x Jml Pot

3 Bekisting Kuantitas = Luas x n


Tinggi (t) = 0.45
Lebar (l) = 0.30
Panjang (p) = 26.08
Luas (L) = 2 x (t x p)
BESI
REKAP UNTUK BALOK TYPE B3 DI LT.2
653.470

II.2.2.4.Balok Type BA
1 Beton
Kuantitas = pxlxtxn
Panjang (p) =
3,01+3,01+3,01+3,01+3,01
1+3,01+3,01+3,01+3,01

= 30.5
Lebar (l) = 0.20
Tinggi (t) = 0.30
2 Pembesian
Sengkang Kuantitas = (Berat Sengkang + Tul.Pokok

Tulangan = 0.1
Berat = 0.39
Panjang = 0.88
Bentang = 30.50
Jumlah tump = 153
Jumlah lap = 117
Tulangan Pokok (4D16) Berat sengkang = Berat x Pjg x (Jml Tump+La

0,2 + 2 + 0,2 - 0,08 = 2,32 Tulangan = 1.6

5d 5d = 0.016
Berat = 1.58
Panjang = 30.98
Jumlah pot = 4
Berat tul,pokok = Berat x Pjg x Jml Pot
Tulangan Pokok (1D16)

Tulangan = 1.6
= 0.016
Berat = 1.58
Panjang = 32.10
Jumlah pot = 1
Berat tul,pokok = Berat x Pjg x Jml Pot

3 Bekisting
Kuantitas = Luas x n
Tinggi 1 (t1) = 0.30
Tinggi 2 (t2) = 0.20
Lebar = 0.20
Panjang (p) = 30.50
Luas (L) = (t1 x p)+(t2 x p) +

BESI
REKAP UNTUK BALOK TYPE B3 DI LT.2
339.695

II.2.2. PEKERJAAN BALOK LT.3


II.2.2.1.Balok Type B1

1 Beton Kuantitas = pxlxtxn


Panjang (p) = 0+9,30+9,30+9,30+9,30+9,
,30+9,30+9,30+9,30+9,30+
+9,30+9,30+9,30+9,30+9
= 54.56

Lebar (l) = 0.45


Tinggi (t) = 0.85

2 Pembesian Kuantitas = (Berat Sengkang + Tul.Pokok


Sengkang
Tulangan = 1.0
Berat = 0.39
Panjang = 3.40
Bentang = 54.56
Jumlah tump = 436
Jumlah lap = 44
Berat sengkang = Berat x Pjg x (Jml Tump+La
Tulangan Pokok (4ɸ22)
Tulangan = 2.20
= 0.022
Berat = 2.98
Panjang = 59.00
Jumlah pot = 4
Berat tul,pokok = Berat x Pjg x Jml Pot

3 Bekisting Kuantitas = Luas x n


Tinggi (t) = 0.85
Lebar (l) = 0.45
Panjang (p) = 54.56
Luas (L) = 2 x (t x p)

BESI
REKAP UNTUK BALOK TYPE B1 DI LT.2
1348.883

II.2.2.2.BalokType B2

1 Beton Kuantitas = pxlxtxn


4,30+4,30+4,30+4,30+4,30
Panjang (p) =
7+1,27+1,27+1,27+1,27+4,
4,51+4,74+4,30+4,30+4,30

= 26.08

Lebar (l) = 0.30


Tinggi (t) = 0.50

2 Pembesian Kuantitas = (Berat Sengkang + Tul.Pokok


Sengkang
Tulangan = 1.3
Berat = 1.04
Panjang = 2.40
Bentang = 26.08
Jumlah tump = 130
Jumlah lap = 101
Berat sengkang = Berat x Pjg x (Jml Tump+La
Tulangan Pokok (7ɸ19)
Tulangan = 1.00
= 0.010
Berat = 0.62
Panjang = 30.42
Jumlah pot = 4
Berat tul,pokok = Berat x Pjg x Jml Pot

3 Bekisting Kuantitas = Luas x n


Tinggi (t) = 0.50
Lebar (l) = 0.30
Panjang (p) = 26.08
Luas (L) = 2 x (t x p)
BESI
REKAP UNTUK BALOK TYPE B2 DI LT.2
653.470

II.2.2.3.BalokType B3
1 Beton Kuantitas = pxlxtxn
4,55+4,55+4,55+4,55+4,55
Panjang (p) = 5+4,55+4,55+4,55+4,65+4,
4,55+4,55+4,55+4,55+4,55
5+4,55+4,55+4,55+4,55+4,
4,55+4,55+4,55+4,55+
+4,65+4,65+4,65+4,65+4,6
= 26.08

Lebar (l) = 0.30


Tinggi (t) = 0.45

2 Pembesian Kuantitas = (Berat Sengkang + Tul.Pokok


Sengkang
Tulangan = 1.3
Berat = 1.04
Panjang = 2.40
Bentang = 26.08
Jumlah tump = 130
Jumlah lap = 101
Berat sengkang = Berat x Pjg x (Jml Tump+La
Tulangan Pokok (5ɸ16)
Tulangan = 1.00
= 0.010
Berat = 0.62
Panjang = 30.42
Jumlah pot = 4
Berat tul,pokok = Berat x Pjg x Jml Pot

3 Bekisting Kuantitas = Luas x n


Tinggi (t) = 0.45
Lebar (l) = 0.30
Panjang (p) = 26.08
Luas (L) = 2 x (t x p)
BESI
REKAP UNTUK BALOK TYPE B3 DI LT.2
653.470

II.2.2.4.Balok Type BA
1 Beton
Kuantitas = pxlxtxn
Panjang (p) =
3,01+3,01+3,01+3,01+3,01
1+3,01+3,01+3,01+3,01

= 30.5
Lebar (l) = 0.20
Tinggi (t) = 0.30
2 Pembesian
Sengkang Kuantitas = (Berat Sengkang + Tul.Pokok

Tulangan = 0.1
Berat = 0.39
Panjang = 0.88
Bentang = 30.50
Jumlah tump = 153
Jumlah lap = 117
Tulangan Pokok (4D16) Berat sengkang = Berat x Pjg x (Jml Tump+La

0,2 + 2 + 0,2 - 0,08 = 2,32 Tulangan = 1.6

5d 5d = 0.016
Berat = 1.58
Panjang = 30.98
Jumlah pot = 4
Berat tul,pokok = Berat x Pjg x Jml Pot
Tulangan Pokok (1D16)

Tulangan = 1.6
= 0.016
Berat = 1.58
Panjang = 32.10
Jumlah pot = 1
Berat tul,pokok = Berat x Pjg x Jml Pot

3 Bekisting
Kuantitas = Luas x n
Tinggi 1 (t1) = 0.30
Tinggi 2 (t2) = 0.20
Lebar = 0.20
Panjang (p) = 30.50
Luas (L) = (t1 x p)+(t2 x p) +

BESI
REKAP UNTUK BALOK TYPE B3 DI LT.2
339.695

II.2.2. PEKERJAAN BALOK LT.4 ( Elv +12.60)


II.2.2.1.Balok Type B1

1 Beton Kuantitas = pxlxtxn


9,30+9,30+9,30+9,30+9,30
Panjang (p) = 0+9,30+9,30+9,30+9,30+9,

= 54.56

Lebar (l) = 0.45


Tinggi (t) = 0.85

2 Pembesian Kuantitas = (Berat Sengkang + Tul.Pokok


Sengkang
Tulangan = 1.0
Berat = 0.39
Panjang = 3.40
Bentang = 54.56
Jumlah tump = 436
Jumlah lap = 44
Berat sengkang = Berat x Pjg x (Jml Tump+La
Tulangan Pokok (4ɸ22)
Tulangan = 2.20
= 0.022
Berat = 2.98
Panjang = 59.00
Jumlah pot = 4
Berat tul,pokok = Berat x Pjg x Jml Pot

3 Bekisting Kuantitas = Luas x n


Tinggi (t) = 0.85
Lebar (l) = 0.45
Panjang (p) = 54.56
Luas (L) = 2 x (t x p)

BESI
REKAP UNTUK BALOK TYPE B1 DI LT.4 (elv +12.60)
1348.883

II.2.2.2.BalokType B2

1 Beton Kuantitas = pxlxtxn


0+4,30+4,30+4,30+4,74+4,
Panjang (p) =
4,74+4,30+4,30+4,30+4,30
0+4,30+4,30+4,30+4,30+4,
4,30+4,30+4,30+4,30+4,30
0+4,30+4,30+4,30+4,30
= 26.08

Lebar (l) = 0.30


Tinggi (t) = 0.50

2 Pembesian Kuantitas = (Berat Sengkang + Tul.Pokok


Sengkang
Tulangan = 1.3
Berat = 1.04
Panjang = 2.40
Bentang = 26.08
Jumlah tump = 130
Jumlah lap = 101
Berat sengkang = Berat x Pjg x (Jml Tump+La
Tulangan Pokok (7ɸ19)
Tulangan = 1.00
= 0.010
Berat = 0.62
Panjang = 30.42
Jumlah pot = 4
Berat tul,pokok = Berat x Pjg x Jml Pot

3 Bekisting Kuantitas = Luas x n


Tinggi (t) = 0.50
Lebar (l) = 0.30
Panjang (p) = 26.08
Luas (L) = 2 x (t x p)
BESI
REKAP UNTUK BALOK TYPE B2 DI LT.2 (elv +12.60)
653.470

II.2.2.3.BalokType B3
1 Beton Kuantitas = pxlxtxn
4,55+4,55+4,55+4,55+4,55
Panjang (p) = 5+4,55+4,55+4,55+4,65+4,
4,55+4,55+4,55+4,55+4,55
5+4,55+4,55+4,55+4,55+4,
4,55+4,55+4,55+4,55+
+4,65+4,65+4,65+4,65+4,6
= 26.08

Lebar (l) = 0.30


Tinggi (t) = 0.45

2 Pembesian Kuantitas = (Berat Sengkang + Tul.Pokok


Sengkang
Tulangan = 1.3
Berat = 1.04
Panjang = 2.40
Bentang = 26.08
Jumlah tump = 130
Jumlah lap = 101
Berat sengkang = Berat x Pjg x (Jml Tump+La
Tulangan Pokok (5ɸ16)
Tulangan = 1.00
= 0.010
Berat = 0.62
Panjang = 30.42
Jumlah pot = 4
Berat tul,pokok = Berat x Pjg x Jml Pot

3 Bekisting Kuantitas = Luas x n


Tinggi (t) = 0.45
Lebar (l) = 0.30
Panjang (p) = 26.08
Luas (L) = 2 x (t x p)
BESI
REKAP UNTUK BALOK TYPE B3 DI LT.4 (elv 12.60)
653.470

II.2.2.4.Balok Type BA
1 Beton
Kuantitas = pxlxtxn
Panjang (p) =
3,01+3,01+3,01+3,01+3,01
1+3,01+3,01+3,01+3,01

= 30.5
Lebar (l) = 0.20
Tinggi (t) = 0.30
2 Pembesian
Sengkang Kuantitas = (Berat Sengkang + Tul.Pokok

Tulangan = 0.1
Berat = 0.39
Panjang = 0.88
Bentang = 30.50
Jumlah tump = 153
Jumlah lap = 117
Tulangan Pokok (4D16) Berat sengkang = Berat x Pjg x (Jml Tump+La

0,2 + 2 + 0,2 - 0,08 = 2,32 Tulangan = 1.6

5d 5d = 0.016
Berat = 1.58
Panjang = 30.98
Jumlah pot = 4
Berat tul,pokok = Berat x Pjg x Jml Pot
Tulangan Pokok (1D16)

Tulangan = 1.6
= 0.016
Berat = 1.58
Panjang = 32.10
Jumlah pot = 1
Berat tul,pokok = Berat x Pjg x Jml Pot
3 Bekisting
Kuantitas = Luas x n
Tinggi 1 (t1) = 0.30
Tinggi 2 (t2) = 0.20
Lebar = 0.20
Panjang (p) = 30.50
Luas (L) = (t1 x p)+(t2 x p) +

BESI
REKAP UNTUK BALOK TYPE BA DI LT.4 (elv 12.60)
339.695
SAT KUANTITAS SAT

pxlxtxn = 20.87 M3
0+9,30+9,30+9,30+9,30+9,30+9,30+9,30+9
,30+9,30+9,30+9,30+9,30+9,30+9,30+9,30
+9,30+9,30+9,30+9,30+9,30+9,30+9,30
m

m
m

(Berat Sengkang + Tul.Pokok) x n = 1348.88 Kg

cm
Kg/m
m
m
pot
pot
Berat x Pjg x (Jml Tump+Lap) = 644.69 Kg

cm
m
Kg/m
m
pot
Berat x Pjg x Jml Pot = 704.19 Kg

= 92.75 M2
m
m
m
= 92.75 M2

BETON BEKISTING

20.869 92.752

pxlxtxn = 3.91 M3
4,30+4,30+4,30+4,30+4,30+4,30+1,27+1,27+1,2
7+1,27+1,27+1,27+1,27+4,74+4,51+4,32+4,32+
4,51+4,74+4,30+4,30+4,30+4,30+4,30+4,30+4,3
0

m
m

(Berat Sengkang + Tul.Pokok) x n = 653.5 Kg

cm
Kg/m
m
m
pot
pot
Berat x Pjg x (Jml Tump+Lap) = 578.45 Kg

cm
m
Kg/m
m
pot
Berat x Pjg x Jml Pot = 75.02 Kg

= 26.08 M2
m
m
m
= 26.08 M2
BETON BEKISTING

3.912 26.08

pxlxtxn = 3.52 M3
4,55+4,55+4,55+4,55+4,55+4,55+4,55+4,55+4,5
5+4,55+4,55+4,55+4,65+4,65+4,55+4,55+4,55+
4,55+4,55+4,55+4,55+4,55+4,55+4,55+4,55+4,5
5+4,55+4,55+4,55+4,55+4,55+4,55+4,55+4,55+
5+4,55+4,55+4,55+4,55+4,55+4,55+4,55+4,55+
4,55+4,55+4,55+4,55+4,55+4,55+4,55
+4,65+4,65+4,65+4,65+4,65+4,65+4,65+4,60+4,
m

m
m

(Berat Sengkang + Tul.Pokok) x n = 653.5 Kg

cm
Kg/m
m
m
pot
pot
Berat x Pjg x (Jml Tump+Lap) = 578.45 Kg

cm
m
Kg/m
m
pot
Berat x Pjg x Jml Pot = 75.02 Kg

= 23.47 M2
m
m
m
= 23.47 M2
BETON BEKISTING

3.521 23.47
pxlxtxn = 1.83 M3

3,01+3,01+3,01+3,01+3,01+3,01+3,01+3,0
1+3,01+3,01+3,01+3,01+3,01+3,01+

m
m
m

(Berat Sengkang + Tul.Pokok) x n = 339.70 Kg

cm
Kg/m
m
m
pot
pot
Berat x Pjg x (Jml Tump+Lap) = 93.46 Kg

cm
m
Kg/m
m
pot
Berat x Pjg x Jml Pot = 195.58 Kg

cm
m
Kg/m
m
pot
Berat x Pjg x Jml Pot = 50.66 Kg

= 21.350 M2
m
m
m
m
(t1 x p)+(t2 x p) + (l x p) = 21.350 M2

BETON BEKISTING

1.830 21.35

pxlxtxn = 20.87 M3
0+9,30+9,30+9,30+9,30+9,30+9,30+9,30+9
,30+9,30+9,30+9,30+9,30+9,30+9,30+9,30
+9,30+9,30+9,30+9,30+9,30+9,30+9,30
m

m
m

(Berat Sengkang + Tul.Pokok) x n = 1348.88 Kg

cm
Kg/m
m
m
pot
pot
Berat x Pjg x (Jml Tump+Lap) = 644.69 Kg

cm
m
Kg/m
m
pot
Berat x Pjg x Jml Pot = 704.19 Kg

= 92.75 M2
m
m
m
= 92.75 M2

BETON BEKISTING

20.869 92.752

pxlxtxn = 3.91 M3
4,30+4,30+4,30+4,30+4,30+4,30+1,27+1,27+1,2
7+1,27+1,27+1,27+1,27+4,74+4,51+4,32+4,32+
4,51+4,74+4,30+4,30+4,30+4,30+4,30+4,30+4,3
0

m
m

(Berat Sengkang + Tul.Pokok) x n = 653.5 Kg


cm
Kg/m
m
m
pot
pot
Berat x Pjg x (Jml Tump+Lap) = 578.45 Kg

cm
m
Kg/m
m
pot
Berat x Pjg x Jml Pot = 75.02 Kg

= 26.08 M2
m
m
m
= 26.08 M2
BETON BEKISTING

3.912 26.08
pxlxtxn = 3.52 M3
4,55+4,55+4,55+4,55+4,55+4,55+4,55+4,55+4,5
5+4,55+4,55+4,55+4,65+4,65+4,55+4,55+4,55+
4,55+4,55+4,55+4,55+4,55+4,55+4,55+4,55+4,5
5+4,55+4,55+4,55+4,55+4,55+4,55+4,55+4,55+
4,55+4,55+4,55+4,55+4,55+4,55+4,55
+4,65+4,65+4,65+4,65+4,65+4,65+4,65+4,60+4,
m

m
m

(Berat Sengkang + Tul.Pokok) x n = 653.5 Kg

cm
Kg/m
m
m
pot
pot
Berat x Pjg x (Jml Tump+Lap) = 578.45 Kg

cm
m
Kg/m
m
pot
Berat x Pjg x Jml Pot = 75.02 Kg

= 23.47 M2
m
m
m
= 23.47 M2
BETON BEKISTING

3.521 23.47
pxlxtxn = 1.83 M3

3,01+3,01+3,01+3,01+3,01+3,01+3,01+3,0
1+3,01+3,01+3,01+3,01+3,01+3,01+

m
m
m

(Berat Sengkang + Tul.Pokok) x n = 339.70 Kg

cm
Kg/m
m
m
pot
pot
Berat x Pjg x (Jml Tump+Lap) = 93.46 Kg

cm
m
Kg/m
m
pot
Berat x Pjg x Jml Pot = 195.58 Kg

cm
m
Kg/m
m
pot
Berat x Pjg x Jml Pot = 50.66 Kg

= 21.350 M2
m
m
m
m
(t1 x p)+(t2 x p) + (l x p) = 21.350 M2

BETON BEKISTING

1.830 21.35

pxlxtxn = 20.87 M3
9,30+9,30+9,30+9,30+9,30+9,30+9,30+9,3
0+9,30+9,30+9,30+9,30+9,30+9,30+9,30+9
,30+9,30+9,30
m

m
m

(Berat Sengkang + Tul.Pokok) x n = 1348.88 Kg

cm
Kg/m
m
m
pot
pot
Berat x Pjg x (Jml Tump+Lap) = 644.69 Kg
cm
m
Kg/m
m
pot
Berat x Pjg x Jml Pot = 704.19 Kg

= 92.75 M2
m
m
m
= 92.75 M2

BETON BEKISTING

20.869 92.752

pxlxtxn = 3.91 M3
0+4,30+4,30+4,30+4,74+4,51+4,32+4,32+4,51+
4,74+4,30+4,30+4,30+4,30+4,30+4,30+4,30+4,3
0+4,30+4,30+4,30+4,30+4,30+4,30+4,30+4,30+
4,30+4,30+4,30+4,30+4,30+4,30+4,30+4,30+4,3
0+4,30+4,30+4,30+4,30+4,30+4,30+4,30
m

m
m

(Berat Sengkang + Tul.Pokok) x n = 653.5 Kg

cm
Kg/m
m
m
pot
pot
Berat x Pjg x (Jml Tump+Lap) = 578.45 Kg

cm
m
Kg/m
m
pot
Berat x Pjg x Jml Pot = 75.02 Kg

= 26.08 M2
m
m
m
= 26.08 M2
BETON BEKISTING

3.912 26.08
pxlxtxn = 3.52 M3
4,55+4,55+4,55+4,55+4,55+4,55+4,55+4,55+4,5
5+4,55+4,55+4,55+4,65+4,65+4,55+4,55+4,55+
4,55+4,55+4,55+4,55+4,55+4,55+4,55+4,55+4,5
5+4,55+4,55+4,55+4,55+4,55+4,55+4,55+4,55+
4,55+4,55+4,55+4,55+4,55+4,55+4,55
+4,65+4,65+4,65+4,65+4,65+4,65+4,65+4,60+4,
m

m
m

(Berat Sengkang + Tul.Pokok) x n = 653.5 Kg

cm
Kg/m
m
m
pot
pot
Berat x Pjg x (Jml Tump+Lap) = 578.45 Kg

cm
m
Kg/m
m
pot
Berat x Pjg x Jml Pot = 75.02 Kg

= 23.47 M2
m
m
m
= 23.47 M2
BETON BEKISTING

3.521 23.47
pxlxtxn = 1.83 M3

3,01+3,01+3,01+3,01+3,01+3,01+3,01+3,0
1+3,01+3,01+3,01+3,01+3,01+3,01+

m
m
m

(Berat Sengkang + Tul.Pokok) x n = 339.70 Kg

cm
Kg/m
m
m
pot
pot
Berat x Pjg x (Jml Tump+Lap) = 93.46 Kg

cm
m
Kg/m
m
pot
Berat x Pjg x Jml Pot = 195.58 Kg

cm
m
Kg/m
m
pot
Berat x Pjg x Jml Pot = 50.66 Kg
= 21.350 M2
m
m
m
m
(t1 x p)+(t2 x p) + (l x p) = 21.350 M2

BETON BEKISTING

1.830 21.35
URAIAN PEKERJAAN / DIMENSI
SKETSA SIMBOL HASIL
II.4 PEKERJAAN STRUKTUR TANGGA
Pekerjaan Beton
LT. 4 As E-F (13-14)
1. Anak Tangga Kuantitas = 1/2 x A x O x Jml anak ta
Antride (A) = 0.30
Optride (O) = 0.15
Lebar (L) = 2.00
Jml anak tangga = 20
Jumlah (n) = 2

2. Plat alas Kuantitas = PxLxTxn


Panjang (P) = 2.70
Lebar (L) = 2.00
Tebal (T) = 0.15
Jumlah (n) = 2

3. Bordes Kuantitas = PxLxTxn


Panjang (P) = 2.00
Lebar (L) = 1.31
Tebal (T) = 0.15
Jumlah (n) = 1

TOTAL KUANTITAS BETON


Pekerjaan Bekisting
1. Anak Tangga Kuantitas = p x l x jml anak tangga x
Jumlah (n) = 2
Panjang (p) = 2.00
Lebar (l) = 0.3
Jml anak tgg = 20

2. Samping kiri kanan anak tangga Kuantitas = p x l x jml potongan x n


Jumlah (n) = 2
Panjang (p) = 2.70
Lebar (l) = 0.33
Jml potongan = 2

3. Plat bawah tangga Kuantitas = p x l x jml potongan x n


Jumlah (n) = 2
Panjang (p) = 2.70
Lebar (l) = 2.00
Jml potongan = 1

4. Alas Bordes Kuantitas = p x l x jml potongan x n


Jumlah (n) = 1
Panjang (p) = 2.00
Lebar (l) = 1.31
Jml potongan = 1

TOTAL KUANTITAS BEKISTING


Pekerjaan Besi

1. Anak Tangga Kuantitas = Berat tul anak tgg x n


Jumlah (n) = 2
Tulangan = 0.6
Berat = 0.22
Panjang = ((0,35-0,25)+ (0,18-0,25))
0.35+0.075
= 0.69

0.18+0.075
5d

Bentang = 0.00
5d
Jumlah pot = 1
Jml anak tangga = 11
Berat tul anak tgg = Berat x Pjg x Jml pot x Jm

2. Tul. Pokok pada anak tangga Kuantitas = Berat tul anak tgg x n
2ɸ8 Jumlah (n) = 2
Tulangan = 0.8
Berat = 0.39
1,8+(2 x 5D)-(2
Panjang =
1,8 - 2 x 0,025 + 2 x 5d
5d 5d = 1.83
Jumlah pot = 2
Jml anak tangga = 11
Berat tul anak tgg = Berat x Pjg x Jml pot x Jm

3. Tulangan atas pada plat alas Kuantitas = Berat tul atas plat x n
ɸ12-15 Jumlah (n) = 2
4.30
Tulangan = 1.2
5d
0.29
Berat = 0.89
Panjang = 0,29 + 1,39 +
= 6.12
Bentang = 0.00
Jumlah pot = 13
Berat tul atas plat = Berat x Pjg x Jumlah pot

4. Tulangan bawah pada plat alas Kuantitas = Berat tul bawah plat x n

4.30

0.29
5d
ɸ12-15 Jumlah (n) = 2

4.30
Tulangan = 1.2
Berat = 0.89
0.29
5d

Panjang = 0,29 + 1.39


= 5.41
Bentang = 2.00
Jumlah pot = 14
Berat tul bwh plat = Berat x Pjg x Jumlah pot

5. Tulangan horizontal pada plat alas Kuantitas = Berat tul bawah plat x n
ɸ8 - 15 Jumlah (n) = 4
Tulangan = 0.8
Berat = 0.39

5d
1,8 - 2 x 0,025 + 2 x 5d
5d
Panjang = 1,8+(2x5D)-(2
= 1.83
Bentang = 2.70
Jumlah pot = 19
Berat tul bwh plat = Berat x Pjg x Jumlah pot x

6. Tulangan Bordes
Tulangan ɸ12 - 15 Kuantitas = Berat tul utama bordes x n
Jumlah (n) = 2
Tulangan = 1.2
Berat = 0.89
Panjang = 1,39 +
= 1.82
Bentang = 1.80
Jumlah pot = 13
Berat tul atas plat = Berat x Pjg x Jumlah pot

Tulangan ɸ8 - 15 Kuantitas = Berat tul horizontal bordes


Jumlah (n) = 2
Tulangan = 0.8
Berat = 0.39
Panjang = 1,8+(2x5D)-(2
= 1.83
Bentang = 1.39
Jumlah pot = 20
Berat tul bwh plat = Berat x Pjg x Jumlah pot x

TOTAL KUANTITAS BES


Pekerjaan Beton
LT. 3 As C (11-12)
1. Anak Tangga Kuantitas = 1/2 x A x O x Jml anak ta
Antride (A) = 0.30
Optride (O) = 0.15
Lebar (L) = 0.20
Jml anak tangga = 23
Jumlah (n) = 2

2. Plat alas Kuantitas = PxLxTxn


Panjang (P) = 2.70
Lebar (L) = 0.00
Tebal (T) = 0.15
Jumlah (n) = 2

3. Bordes Kuantitas = PxLxTxn


Panjang (P) = 1.45
Lebar (L) = 1.37
Tebal (T) = 0.15
Jumlah (n) = 1

TOTAL KUANTITAS BETON


Pekerjaan Bekisting
1. Anak Tangga Kuantitas = p x l x jml anak tangga x
Jumlah (n) = 2
Panjang (p) = 0.20
Lebar (l) = 0.3
Jml anak tgg = 23

2. Samping kiri kanan anak tangga Kuantitas = p x l x jml potongan x n


Jumlah (n) = 2
Panjang (p) = 2.70
Lebar (l) = 0.33
Jml potongan = 2

3. Plat bawah tangga Kuantitas = p x l x jml potongan x n


Jumlah (n) = 2
Panjang (p) = 2.70
Lebar (l) = 0.20
Jml potongan = 1

4. Alas Bordes Kuantitas = p x l x jml potongan x n


Jumlah (n) = 1
3.20
Panjang (p) = 1.45
1.31
3.20

1.31 Lebar (l) = 1.37


Jml potongan = 1

TOTAL KUANTITAS BEKISTING


Pekerjaan Besi

1.80
0.35

1. Anak Tangga Kuantitas = Berat tul anak tgg x n


Jumlah (n) = 2
Tulangan = 0.6
Berat = 0.22
Panjang = ((0,35-0,25)+ (0,18-0,25))
0.35+0.075
5d
0.18+0.075
= 0.69
Bentang = 0.00
5d
Jumlah pot = 1
Jml anak tangga = 11
Berat tul anak tgg = Berat x Pjg x Jml pot x Jm

2. Tul. Pokok pada anak tangga Kuantitas = Berat tul anak tgg x n
2ɸ8 Jumlah (n) = 2
Tulangan = 0.8
Berat = 0.39
1,8+(2 x 5D)-(2
Panjang =
1,8 - 2 x 0,025 + 2 x 5d
5d 5d = 1.83
Jumlah pot = 2
Jml anak tangga = 11
Berat tul anak tgg = Berat x Pjg x Jml pot x Jm

3. Tulangan atas pada plat alas Kuantitas = Berat tul atas plat x n
ɸ12-15 Jumlah (n) = 2
4.30
Tulangan = 1.2
0.29
5d Berat = 0.89
Panjang = 0,29 + 1,39 +
= 6.12
Bentang = 0.00
Jumlah pot = 13
Berat tul atas plat = Berat x Pjg x Jumlah pot

4. Tulangan bawah pada plat alas Kuantitas = Berat tul bawah plat x n
ɸ12-15 Jumlah (n) = 2

4.30
Tulangan = 1.2
Berat = 0.89
0.29
5d

Panjang = 0,29 + 1.39


= 5.41
Bentang = 0.20
Jumlah pot = 2
Berat tul bwh plat = Berat x Pjg x Jumlah pot

5. Tulangan horizontal pada plat alas Kuantitas = Berat tul bawah plat x n
ɸ8 - 15 Jumlah (n) = 4
Tulangan = 0.8
Berat = 0.39

5d
1,8 - 2 x 0,025 + 2 x 5d
5d
Panjang = 1,8+(2x5D)-(2
= 1.83
Bentang = 2.70
Jumlah pot = 19
Berat tul bwh plat = Berat x Pjg x Jumlah pot x

6. Tulangan Bordes
Tulangan ɸ12 - 15 Kuantitas = Berat tul utama bordes x n
Jumlah (n) = 2
Tulangan = 1.2
Berat = 0.89
Panjang = 1,39 +
= 1.82
Bentang = 1.80
Jumlah pot = 13
Berat tul atas plat = Berat x Pjg x Jumlah pot

Tulangan ɸ8 - 15 Kuantitas = Berat tul horizontal bordes


Jumlah (n) = 2
Tulangan = 0.8
Berat = 0.39
Panjang = 1,8+(2x5D)-(2
= 1.83
Bentang = 1.39
Jumlah pot = 10
Berat tul bwh plat = Berat x Pjg x Jumlah pot x
TOTAL KUANTITAS BES

0,2 + 2 + 0,2 - 0,08 = 2,32


5d 5d
SAT KUANTITAS SAT

1/2 x A x O x Jml anak tangga x n = 1.80 M3


m
m
m
anak
unit

PxLxTxn = 1.62 M3
m
m
m
unit

PxLxTxn = 0.39 M3
m
m
m
unit

OTAL KUANTITAS BETON PADA TANGGA = 3.81 M3

p x l x jml anak tangga x n = 24.00 M2


unit
m
m
buah

p x l x jml potongan x n = 3.56 M2


unit
m
m
pot

p x l x jml potongan x n = 10.80 M2


unit
m
m
pot

p x l x jml potongan x n = 2.62 M2


unit
m
m
pot

L KUANTITAS BEKISTING PADA TANGGA = 40.98 M3

Berat tul anak tgg x n = 3.37 Kg


unit
cm
Kg/m
((0,35-0,25)+ (0,18-0,25))+0,15+5Dx2
m
m
pot
buah
Berat x Pjg x Jml pot x Jml anak = 1.68 Kg

Berat tul anak tgg x n = 31.77 Kg


unit
cm
Kg/m
1,8+(2 x 5D)-(2 x 0,025)

m
pot
buah
Berat x Pjg x Jml pot x Jml anak = 15.88 Kg

Berat tul atas plat x n = 141.35 Kg


unit
cm
Kg/m
0,29 + 1,39 + 4,3 + (2 × 6D)

m
pot
Berat x Pjg x Jumlah pot = 70.68 Kg

Berat tul bawah plat x n = 50.90 Kg


unit
cm
Kg/m
0,29 + 1.39 + 4,3 + (2×6D)
m
m
pot
Berat x Pjg x Jumlah pot = 25.45 Kg

Berat tul bawah plat x n = 109.75 Kg


unit
cm
Kg/m
1,8+(2x5D)-(2x0,025)

m
pot
Berat x Pjg x Jumlah pot x 2sisi = 27.44 Kg

Berat tul utama bordes x n = 42.10 Kg


unit
cm
Kg/m
1,39 + (2 × 5D)

m
pot
Berat x Pjg x Jumlah pot = 21.05 Kg

Berat tul horizontal bordes x n = 57.76 Kg


unit
cm
Kg/m
1,8+(2x5D)-(2x0,025)

m
pot
Berat x Pjg x Jumlah pot x 2sisi = 28.88 Kg

TOTAL KUANTITAS BESI PADA TANGGA = 437.01 Kg


1/2 x A x O x Jml anak tangga x n = 0.21 M3
m
m
m
anak
unit

PxLxTxn = 0.00 M3
m
m
m
unit

PxLxTxn = 0.30 M3
m
m
m
unit

OTAL KUANTITAS BETON PADA TANGGA = 0.50 M3

p x l x jml anak tangga x n = 2.76 M2


unit
m
m
buah

p x l x jml potongan x n = 3.56 M2


unit
m
m
pot

p x l x jml potongan x n = 1.08 M2


unit
m
m
pot

p x l x jml potongan x n = 1.99 M2


unit
m
m
pot

L KUANTITAS BEKISTING PADA TANGGA = 9.39 M3

Berat tul anak tgg x n = 3.37 Kg


unit
cm
Kg/m
((0,35-0,25)+ (0,18-0,25))+0,15+5Dx2
m
m
pot
buah
Berat x Pjg x Jml pot x Jml anak = 1.68 Kg

Berat tul anak tgg x n = 31.77 Kg


unit
cm
Kg/m
1,8+(2 x 5D)-(2 x 0,025)

m
pot
buah
Berat x Pjg x Jml pot x Jml anak = 15.88 Kg

Berat tul atas plat x n = 141.35 Kg


unit
cm
Kg/m
0,29 + 1,39 + 4,3 + (2 × 6D)

m
pot
Berat x Pjg x Jumlah pot = 70.68 Kg

Berat tul bawah plat x n = 0.83 Kg


unit
cm
Kg/m
0,29 + 1.39 + 4,3 + (2×6D)
m
m
pot
Berat x Pjg x Jumlah pot = 0.41 Kg

Berat tul bawah plat x n = 109.75 Kg


unit
cm
Kg/m
1,8+(2x5D)-(2x0,025)

m
pot
Berat x Pjg x Jumlah pot x 2sisi = 27.44 Kg

Berat tul utama bordes x n = 42.10 Kg


unit
cm
Kg/m
1,39 + (2 × 5D)

m
pot
Berat x Pjg x Jumlah pot = 21.05 Kg

Berat tul horizontal bordes x n = 29.65 Kg


unit
cm
Kg/m
1,8+(2x5D)-(2x0,025)

m
pot
Berat x Pjg x Jumlah pot x 2sisi = 14.83 Kg
TOTAL KUANTITAS BESI PADA TANGGA = 358.82 Kg