RENCANA ANGGARAN BIAYA

PEKERJAAN : REVITALISASI KAWASAN ISLAMIC CENTER KOTA PALOPO


LOKASI : KOTA PALOPO - SULAWESI SELATAN
TAHUN ANGGARAN : 2021 - 2022 - 2023

PEKERJAAN PERSIAPAN PRASARANA DAN PENUNJANG


KONTRAK PEKERJAAN TAMBAH PEKERJAAN KURANG PEKERJAAN ADDENDUM TAMBAH KURANG

NO JENIS PEKERJAAN SAT HARGA SATUAN JUMLAH HARGA HARGA SATUAN JUMLAH HARGA HARGA SATUAN JUMLAH HARGA HARGA SATUAN JUMLAH HARGA KETERANGAN
VOLUME VOLUME VOLUME VOLUME
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.)

A PEKERJAAN PERSIAPAN PRASARANA DAN PENUNJANG


1 Setting-out m' 677.00 68,244.00 46,201,188.00 677.00 68,244.00 46,201,188.00 TETAP
2 Papan Proyek Bh 1.00 300,000.00 300,000.00 1.00 300,000.00 300,000.00 TETAP
3 Pagar Proyek m' 425.50 270,396.50 115,053,710.75 425.50 270,396.50 115,053,710.75 TETAP
4 Direksi Keet m2 18.00 1,576,130.79 28,370,354.14 18.00 1,576,130.79 28,370,354.14 TETAP
5 Gudang Bahan m2 15.00 1,083,060.00 16,245,900.00 15.00 1,083,060.00 16,245,900.00 TETAP
6 Barak Kerja M2 98.81 859,760.00 84,954,751.89 98.81 859,760.00 84,954,751.89 TETAP
7 Mobilisasi dan demobilisasi Ls 1.00 19,000,000.00 19,000,000.00 1.00 19,000,000.00 19,000,000.00 TETAP
8 Pembersihan lahan dan removal Ls 1.00 6,000,000.00 6,000,000.00 1.00 6,000,000.00 6,000,000.00 TETAP
9 Desdig Development Ls 1.00 101,950,000.00 101,950,000.00 1.00 101,950,000.00 101,950,000.00 TETAP
TOTAL PEKERJAAN PERSIAPAN : 418,075,904.78 - - 418,075,904.78
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
KOTA PALOPO PROVINSI SULAWESI SELATAN

PEKERJAAN : PEMBANGUNAN REVITALISASI KAWASAN ISLAMIC CENTER (TAHUN JAMAK)


NOMOR KONTRAK : 02/SPMK/PPK-CK/MY/APBD/PUPR-PLP/XI/2021
TANGGAL KONTRAK : 25 NOVEMBER 2021
KONSULTAN MANAJEMEN KONTRUKSI : PT. MARANNU MARAYA MAINDAN
KONTRAKTOR PELAKSANA : PT. BANGUN BUMI INDAH
LOKASI : GEDUNG SEKOLAH DASAR

BACK UP DATA
JENIS PEKERJAAN : PENDAHULUAN

Panjang Lebar
Tinggi Volume Volume
No. Uraian Pekerjaan Rumus Lebar Jumlah Sat Ket
MC-100 Kontrak
(m) (m) (m)

1 Setting-out 677.00 m2 677.00


Papan Proyek 1.00 bh 1.00
Pagar Proyek P 425.50 m1 425.50
Direksi Keet PxL 5.00 3.60 1.00 m2 18.00
Gudang Bahan PxL 5.00 3.00 1.00 m2 15.00
Barak Kerja PxL 9.41 3.50 3.00 m2 98.81
Mobilisasi dan demobilisasi 1.00 ls 1.00
Pembersihan lahan dan removal 1.00 ls 1.00
Desdig Development 1.00 ls 1.00

TOTAL VOLUME