VI 033/SPK/CVL/T TIT-BLG/IX/2022
Pek. Pembersihan Oil Trapped Tangki T.104 thp.1
1 Pemompaan oil trapped inc. storage drum dan 1 LS 40,000,000 10,000,000 50,000,000 50,000,000 31,000,000 31,000,000 38%
pengangkutan ke lokasi limbah TOTAL 50,000,000 31,000,000
IX 067/SPK/CVL/T TIT-BLG/I/2023
Pek. Batu Belah 1 : 4 T. 211 Tahap 2
1 Pemasangan batu belah 1:4 keliling tangki 49 M3 24,402,000 19,796,000 44,198,000 902,000 590,000 28,910,000 35%
T. 211 tahap 2 TOTAL 44,198,000 28,910,000
X 068/SPK/CVL/T TIT-BLG/I/2023
Pek. Batu Belah 1 : 4 T. 211 Tahap 3
1 Pemasangan batu belah 1:4 keliling tangki 49 M3 24,402,000 19,796,000 44,198,000 902,000 590,000 28,910,000 35%
T. 211 tahap 3 TOTAL 44,198,000 28,910,000
XI 069/SPK/CVL/T TIT-BLG/I/2023
Pek. Batu Belah 1 : 4 T. 211 Tahap 4
1 Pemasangan batu belah 1:4 keliling tangki 19 M3 9,462,000 7,676,000 17,138,000 902,000 590,000 11,210,000 35%
T. 211 tahap 4 TOTAL 17,138,000 11,210,000