Noted :
Nilai Kontrak
26,707,751,000.00
721,109,277.10
6,489,983,493.90
CROSS CHECK PEMBAYARAN KONTRAKTOR TERHADAP NILAI PROGRESS FISIK
MINGGU KE-20
PERIODE 22-04-20 S/D 28-04-20
I PEKERJAAN PENDAHULUAN Rp 102,603,028.56 0.423% 79,024,288.17 0.325% 102,603,028.56 0.423% 23,578,740.39 0.097%
I. PEKERJAAN ARSITEKTUR
A PEKERJAAN PASANGAN DINDING
- Lantai Basement (Elevasi ± 0.00) Rp 113,286,695.52 0.467% 102,249,420.63 0.421% 85,843,152.36 0.354% -16,406,268.27 -0.068%
- Lantai I (Elevasi ± 0.00) Rp 60,397,887.99 0.249% 47,319,295.70 0.195% 5,858,071.56 0.024% -41,461,224.15 -0.171%
- Lantai II (Elevasi ± 4.00) Rp 11,237,053.37 0.046% 13,876,786.55 0.057% 8,584,206.47 0.035% -5,292,580.07 -0.022%
- Lantai III (Elevasi ± 8.00) Rp 8,826,917.45 0.036% 13,876,786.55 0.057% 6,129,070.55 0.025% -7,747,715.99 -0.032%
- Lantai IV (Elevasi ± 12.00) Rp 5,003,739.30 0.021% 45,069,435.49 0.186% - 0.000% -45,069,435.49 -0.186%
B PEKERJAAN LANTAI -
- Lantai Basement (Elevasi ± 0.00) Rp 144,072,606.38 0.593% 80,313,459.84 0.331% 27,918,607.50 0.115% -52,394,852.34 -0.216%
- Lantai II (Elevasi ± 4.00) Rp 83,774,680.98 0.345% 48,106,012.50 0.198% 74,449,620.00 0.307% 26,343,607.50 0.109%
- Lantai III (Elevasi ± 8.00) Rp 83,256,377.20 0.343% 43,943,930.68 0.181% 64,523,004.00 0.266% 20,579,073.32 0.085%
- Lantai IV (Elevasi ± 12) Rp 542,533,845.26 2.235% 297,248,186.49 1.224% 371,019,681.27 1.528% 73,771,494.78 0.304%
C PEKERJAAN PINTU/JENDELA -
- Lantai Basement (Elevasi ± 0.00) Rp 138,462,450.00 0.570% 81,640,993.00 0.336% 73,787,910.00 0.304% -7,853,083.00 -0.032%
- Lantai I (Elevasi ± 0.00) Rp 85,393,750.00 0.352% 51,568,957.90 0.212% - 0.000% -51,568,957.90 -0.212%
- Lantai II (Elevasi ± 4.00) Rp 133,244,000.00 0.549% 75,810,288.65 0.312% 83,382,760.00 0.343% 7,572,471.35 0.031%
- Lantai III (Elevasi ± 8.00) Rp 133,574,000.00 0.550% 75,892,788.65 0.313% 96,718,087.50 0.398% 20,825,298.85 0.086%
- Lantai IV (Elevasi ± 12.00) Rp 91,871,900.00 0.378% 50,561,096.50 0.208% 5,856,300.00 0.024% -44,704,796.50 -0.184%
D PEKERJAAN PLAFOND -
- Lantai Basement (Elevasi ± 0.00) Rp 45,017,185.00 0.185% 45,009,951.59 0.185% 40,419,250.00 0.166% -4,590,701.59 -0.019%
- Lantai IV (Elevasi ± 12) Rp 173,125,265.00 0.713% 124,283,487.96 0.512% 154,640,350.00 0.637% 30,356,862.04 0.125%
- Lantai Basement (Elevasi ± 0.00) Rp 39,406,542.80 0.162% 23,642,992.10 0.097% 1,958,532.00 0.008% -21,684,460.10 -0.089%
- Lantai I (Elevasi ± 0.00) Rp 20,887,906.55 0.086% 11,509,236.51 0.047% 6,266,371.97 0.026% -5,242,864.54 -0.022%
- Lantai II (Elevasi ± 4.00) Rp 55,920,635.33 0.230% 30,812,270.07 0.127% 19,158,063.24 0.079% -11,654,206.83 -0.048%
- Lantai III (Elevasi ± 8.00) Rp 140,011,904.55 0.577% 77,146,559.41 0.318% 61,203,697.85 0.252% -15,942,861.56 -0.066%
- Lantai IV (Elevasi ± 12) Rp 145,534,322.07 0.599% 80,189,411.46 0.330% 71,577,169.81 0.295% -8,612,241.65 -0.035%
F PEKERJAAN SANITAIR
- Lantai Basement (Elevasi ± 0.00) Rp 1,200,000.00 0.005% 61,200.00 0.000% - 0.000% -61,200.00 0.000%
- Lantai I (Elevasi ± 0,00) Rp 13,500,000.00 0.056% 688,500.00 0.003% - 0.000% -688,500.00 -0.003%
- Lantai II (Elevasi + 4,00) Rp 13,500,000.00 0.056% 688,500.00 0.003% - 0.000% -688,500.00 -0.003%
- Lantai III (Elevasi + 8,00) Rp 13,500,000.00 0.056% 688,500.00 0.003% - 0.000% -688,500.00 -0.003%
- Lantai IV (Elevasi ± 12.00) Rp 25,800,000.00 0.106% 6,475,800.00 0.027% - 0.000% -6,475,800.00 -0.027%
G PEKERJAAN ATAP KANOPI DAN BESI Rp 213,149,711.94 0.878% 92,424,892.26 0.381% 29,997,600.00 0.124% -62,427,292.26 -0.257%
H PEKERJAAN HALAMAN Rp 428,954,241.25 1.767% 61,046,825.38 0.251% 68,277,289.99 0.281% 7,230,464.61 0.030%
IV. KESEHATAN DAN KESELAMATAN KERJA ( K3 ) Rp 250,350,000.00 1.031% 143,057,142.86 0.589% 222,750,000.00 0.917% 79,692,857.14 0.328%
Nilai Setelah
Potongan PPN10% +
Uraian Total Nilai Terbayar (Rp) Terpotong PPN 10% +
PPH3% (Rp)
PPH 3% (Rp)
- Uang Muka (15%) 4,006,162,650.00 520,801,144.50 3,485,361,505.50
- Termijn 1 (7%) 253,723,635.00 32,984,072.55 220,739,562.45
- Termijn 2 (13%) 1,362,095,301.00 177,072,389.13 1,185,022,911.87
- Termijn 3 (20%) 1,589,111,185.00 206,584,454.05 1,382,526,730.95
TOTAL TERIMA DANA 7,211,092,771.00 937,442,060.23 6,273,650,710.77
DEVIASI -572,262,532.00 MINUS
Page 2 of 2
CROSS CHECK PEMBAYARAN KONTRAKTOR TERHADAP NILAI PROGRESS TERBAYAR
MINGGU KE-20
PERIODE 22-04-20 S/D 28-04-20
DEVIASI (AKTUAL DEVIASI PROGRESS
TERHADAP (AKTUAL PROGRESS
NO URAIAN PEKERJAAN JUMLAH NILAI (Rp) Bobot %
RENCANA RENCANA AKTUAL TERHADAP AKTUAL PROGRESS PEMBAYARAN - PEMBAYARAN -
PENGELUARAN (Rp) PROGRESS (%) PEMBAYARAN (Rp) PEMBAYARAN (%) RENCANA RENCANA
PENGELUARAN) PROGRESS)
(Rp) (%)
I PEKERJAAN PENDAHULUAN Rp 102,603,028.56 0.423% 79,024,288.17 0.325% 102,603,028.56 0.423% 23,578,740.39 0.097%
I. PEKERJAAN ARSITEKTUR
A PEKERJAAN PASANGAN DINDING
- Lantai Basement (Elevasi ± 0.00) Rp 113,286,695.52 0.467% 102,249,420.63 0.421% 85,843,152.36 0.354% -16,406,268.27 -0.068%
- Lantai I (Elevasi ± 0.00) Rp 60,397,887.99 0.249% 47,319,295.70 0.195% 5,858,071.56 0.024% -41,461,224.15 -0.171%
- Lantai II (Elevasi ± 4.00) Rp 11,237,053.37 0.046% 13,876,786.55 0.057% 8,584,206.47 0.035% -5,292,580.07 -0.022%
- Lantai III (Elevasi ± 8.00) Rp 8,826,917.45 0.036% 13,876,786.55 0.057% 6,129,070.55 0.025% -7,747,715.99 -0.032%
- Lantai IV (Elevasi ± 12.00) Rp 5,003,739.30 0.021% 45,069,435.49 0.186% - 0.000% -45,069,435.49 -0.186%
B PEKERJAAN LANTAI -
- Lantai Basement (Elevasi ± 0.00) Rp 144,072,606.38 0.593% 80,313,459.84 0.331% 27,918,607.50 0.115% -52,394,852.34 -0.216%
- Lantai II (Elevasi ± 4.00) Rp 83,774,680.98 0.345% 48,106,012.50 0.198% 74,449,620.00 0.307% 26,343,607.50 0.109%
- Lantai III (Elevasi ± 8.00) Rp 83,256,377.20 0.343% 43,943,930.68 0.181% 64,523,004.00 0.266% 20,579,073.32 0.085%
- Lantai IV (Elevasi ± 12) Rp 542,533,845.26 2.235% 297,248,186.49 1.224% 371,019,681.27 1.528% 73,771,494.78 0.304%
C PEKERJAAN PINTU/JENDELA -
- Lantai Basement (Elevasi ± 0.00) Rp 138,462,450.00 0.570% 81,640,993.00 0.336% 73,787,910.00 0.304% -7,853,083.00 -0.032%
- Lantai I (Elevasi ± 0.00) Rp 85,393,750.00 0.352% 51,568,957.90 0.212% - 0.000% -51,568,957.90 -0.212%
- Lantai II (Elevasi ± 4.00) Rp 133,244,000.00 0.549% 75,810,288.65 0.312% 83,382,760.00 0.343% 7,572,471.35 0.031%
- Lantai III (Elevasi ± 8.00) Rp 133,574,000.00 0.550% 75,892,788.65 0.313% 96,718,087.50 0.398% 20,825,298.85 0.086%
- Lantai IV (Elevasi ± 12.00) Rp 91,871,900.00 0.378% 50,561,096.50 0.208% 5,856,300.00 0.024% -44,704,796.50 -0.184%
D PEKERJAAN PLAFOND -
- Lantai Basement (Elevasi ± 0.00) Rp 45,017,185.00 0.185% 45,009,951.59 0.185% 40,419,250.00 0.166% -4,590,701.59 -0.019%
- Lantai IV (Elevasi ± 12) Rp 173,125,265.00 0.713% 124,283,487.96 0.512% 154,640,350.00 0.637% 30,356,862.04 0.125%
F PEKERJAAN SANITAIR
- Lantai Basement (Elevasi ± 0.00) Rp 1,200,000.00 0.005% 61,200.00 0.000% - 0.000% -61,200.00 0.000%
- Lantai I (Elevasi ± 0,00) Rp 13,500,000.00 0.056% 688,500.00 0.003% - 0.000% -688,500.00 -0.003%
- Lantai II (Elevasi + 4,00) Rp 13,500,000.00 0.056% 688,500.00 0.003% - 0.000% -688,500.00 -0.003%
- Lantai III (Elevasi + 8,00) Rp 13,500,000.00 0.056% 688,500.00 0.003% - 0.000% -688,500.00 -0.003%
- Lantai IV (Elevasi ± 12.00) Rp 25,800,000.00 0.106% 6,475,800.00 0.027% - 0.000% -6,475,800.00 -0.027%
G PEKERJAAN ATAP KANOPI DAN BESI Rp 213,149,711.94 0.878% 92,424,892.26 0.381% 29,997,600.00 0.124% -62,427,292.26 -0.257%
H PEKERJAAN HALAMAN Rp 428,954,241.25 1.767% 61,046,825.38 0.251% 68,277,289.99 0.281% 7,230,464.61 0.030%
IV. KESEHATAN DAN KESELAMATAN KERJA ( K3 ) Rp 250,350,000.00 1.031% 143,057,142.86 0.589% 222,750,000.00 0.917% 79,692,857.14 0.328%
Nilai Setelah
Potongan PPN10% +
Uraian Total Nilai Terbayar (Rp) Terpotong PPN 10%
PPH3% (Rp)
+ PPH 3% (Rp)
- Uang Muka (15%) 4,006,162,650.00 520,801,144.50 3,485,361,505.50
- Termijn 1 (7%) 253,723,635.00 32,984,072.55 220,739,562.45
- Termijn 2 (13%) 1,362,095,301.00 177,072,389.13 1,185,022,911.87
- Termijn 3 (20%) 1,589,111,185.00 206,584,454.05 1,382,526,730.95
TOTAL TERIMA DANA 7,211,092,771.00 937,442,060.23 6,273,650,710.77
DEVIASI 495,651,076.81 PLUS
Page 2 of 2
RE - TIME SCHEDULE CCO-02
KEGIATAN : PEMBANGUNAN, REHABILITASI DAN RENOVASI SARANA PRASARANA INFRASTRUKTUR PERGURUAN TINGGI NEGERI
PEKERJAAN : PEMBANGUNAN GEDUNG WORKSHOP TERPADU, GEDUNG PERKULIAHAN TERPADU POLITEKNIK NEGERI BALIKPAPAN
LOKASI : GEDUNG WORKSHOP TERPADU
NO URAIAN PEKERJAAN Bobot % mgg 1 mgg 2 mgg 3 mgg 4 mgg 5 mgg 6 mgg 7 mgg 8 mgg 9 mgg 10 mgg 11 mgg 12 mgg 13 mgg 14 mgg 15 mgg 16
I. PEKERJAAN ARSITEKTUR
A PEKERJAAN PASANGAN DINDING
- Lantai Basement (Elevasi ± 0.00) 0.467% 102,249.42 1,022,494.21 1,022,494.21 25,562,355.16 25,562,355.16 25,562,355.16 11,707,558.66 11,707,558.66
- Lantai I (Elevasi ± 0.00) 0.249% 47,319.30 1,182,982.39 1,182,982.39 11,829,823.93 11,829,823.93 11,829,823.93 4,708,269.92 4,708,269.92
- Lantai II (Elevasi ± 4.00) 0.046% 13,876.79 346,919.66 346,919.66 2,775,357.31 2,775,357.31 2,775,357.31 2,421,499.25 2,421,499.25
- Lantai III (Elevasi ± 8.00) 0.036% 13,876.79 346,919.66 346,919.66 2,775,357.31 2,775,357.31 3,469,196.64
- Lantai IV (Elevasi ± 12.00) 0.021% 15,023,145.16 15,023,145.16 2,253,471.77 2,253,471.77 2,253,471.77 2,253,471.77 2,253,471.77 1,877,893.15 1,877,893.15
B PEKERJAAN LANTAI -
- Lantai Basement (Elevasi ± 0.00) 0.593% 147,160.49 3,679,012.31
- Lantai II (Elevasi ± 4.00) 0.345% 12,026,503.13
- Lantai III (Elevasi ± 8.00) 0.343% 83,803.76
- Lantai IV (Elevasi ± 12) 2.235% 536,926.00 13,423,149.93
C PEKERJAAN PINTU/JENDELA -
- Lantai Basement (Elevasi ± 0.00) 0.570% 156,230.50 3,905,762.50
- Lantai I (Elevasi ± 0.00) 0.352% 100,400.40 2,510,010.00
- Lantai II (Elevasi ± 4.00) 0.549% 141,193.65 3,529,841.25
- Lantai III (Elevasi ± 8.00) 0.550% 141,193.65 3,529,841.25
- Lantai IV (Elevasi ± 12.00) 0.378% 91,671.50 2,291,787.50
D PEKERJAAN PLAFOND -
- Lantai Basement (Elevasi ± 0.00) 0.185% 44,662.50 446,625.00 8,932,500.00 8,932,500.00 11,165,625.00 8,932,500.00 3,277,769.55 3,277,769.55
- Lantai IV (Elevasi ± 12) 0.713% 23,889,107.14 11,025,741.76 11,025,741.76 11,025,741.76 11,025,741.76 11,025,741.76 11,025,741.76
E PEKERJAAN FINISHING -
- Lantai Basement (Elevasi ± 0.00) 0.162% 45,818.46 1,145,461.49
- Lantai I (Elevasi ± 0.00) 0.086% 20,887.91 522,197.66
- Lantai II (Elevasi ± 4.00) 0.230% 55,920.64 1,398,015.88
- Lantai III (Elevasi ± 8.00) 0.577% 140,011.90 3,500,297.61
- Lantai IV (Elevasi ± 12) 0.599% 145,534.32 3,638,358.05
F PEKERJAAN SANITAIR
- Lantai Basement (Elevasi ± 0.00) 0.005%
- Lantai I (Elevasi ± 0,00) 0.056%
- Lantai II (Elevasi + 4,00) 0.056%
- Lantai III (Elevasi + 8,00) 0.056%
- Lantai IV (Elevasi ± 12.00) 0.106% 5,160,000.00
G PEKERJAAN ATAP KANOPI DAN BESI 0.878% 233,970.01 5,849,250.15 5,849,250.15 13,825,500.36 13,825,500.36
IV. KESEHATAN DAN KESELAMATAN KERJA ( K3 ) 1.031% 7,152,857.14 7,152,857.14 7,152,857.14 7,152,857.14 7,152,857.14 7,152,857.14 7,152,857.14 7,152,857.14 7,152,857.14 7,152,857.14 7,152,857.14 7,152,857.14 7,152,857.14 7,152,857.14 7,152,857.14 7,152,857.14
a. JUMLAH 100.00%
RENCANA PROGRESS MINGGUAN 19,326,144.29 47,518,484.69 110,414,530.46 209,226,585.18 47,962,185.66 48,927,092.94 49,376,374.74 83,537,773.79 194,532,471.06 229,236,078.64 391,033,792.17 299,628,867.15 316,218,899.57 315,369,567.67 376,183,775.29 444,528,075.16
RENCANA PROGRESS SAMPAI DENGAN 19,326,144.29 66,844,628.97 177,259,159.44 386,485,744.62 434,447,930.27 483,375,023.22 532,751,397.95 616,289,171.74 810,821,642.80 1,040,057,721.44 1,431,091,513.61 1,730,720,380.76 2,046,939,280.33 2,362,308,848.00 2,738,492,623.29 3,183,020,698.45
REALISASI BOBOT MINGGUAN
REALISASI BOBOT MINGGUAN KUMULATIF
DEVIASI
mgg 17 mgg 18 mgg 19 mgg 20 mgg 21 mgg 22 mgg 23 mgg 24 mgg 25 mgg 26 mgg 27 mgg 28 mgg 29 mgg 30 mgg 31 mgg 32 mgg 33 mgg 34 mgg 35 KETERANGAN
01 - 07 08 - 14 15 - 21 22 - 28 29 - 05 06 - 12 13 - 19 20- 26 27 - 02 03 - 09 10 - 16 17- 23 24- 30 01- 07 08- 14 15- 21 22- 28 29- 04 05- 08
1,813,749.26 1,813,749.26 1,813,749.26 1,813,749.26 79,024,288.17 1,813,749.26 1,813,749.26 1,813,749.26 - - 1,813,749.26 1,813,749.26 1,813,749.26 1,813,749.26 1,813,749.26 1,813,749.26 1,813,749.26 1,813,749.26 1,813,749.26 1,813,749.26
100%
93,974,468.01 305,417,021.02 603,664,631.95 233,773,405.16 2,129,586,972.19 233,773,405.16 233,773,405.16 233,773,405.16 - - 467,546,810.31 467,546,810.31 467,546,810.31 467,546,810.31 467,546,810.31 467,546,810.31
34,760,711.64 34,760,711.64 45,355,729.96 43,587,605.01 480,079,173.75 43,587,605.01 43,587,605.01 43,587,605.01 - - 58,116,806.68 58,116,806.68 58,116,806.68 58,116,806.68 58,116,806.68 58,116,806.68 58,116,806.68 58,116,806.68 58,116,806.68
20,563,740.00 20,563,740.00 18,021,172.75 17,544,441.39 97,256,834.14 17,544,441.39 17,544,441.39 17,544,441.39 - - 23,392,588.52 23,392,588.52 23,392,588.52 23,392,588.52 23,392,588.52 23,392,588.52 23,392,588.52 23,392,588.52 23,392,588.52
76,420,166.51 76,420,166.51 59,472,823.56 33,621,667.52 462,108,370.10 33,621,667.52 33,621,667.52 33,621,667.52 - - 44,828,890.03 44,828,890.03 44,828,890.03 44,828,890.03 44,828,890.03 44,828,890.03 44,828,890.03 44,828,890.03 44,828,890.03
156,265.35 156,265.35 156,265.35 15,626,534.84 15,626,534.84 - - 12,479,804.05 12,479,804.05 12,479,804.05 12,479,804.05 12,479,804.05 12,479,804.05 12,479,804.05 12,479,804.05 12,479,804.05 12,479,804.05
488,645.27 488,645.27 12,216,131.71 12,216,131.71 12,216,131.71 - - 12,216,131.71 12,216,131.71 12,216,131.71 12,216,131.71 12,216,131.71 12,216,131.71 122,161,317.07 122,161,317.07 133,888,803.51
- 741,481.75 18,537,043.75 18,537,043.75 - - 18,537,043.75 74,148,175.00 92,685,218.75 92,685,218.75 92,685,218.75 92,685,218.75 74,148,175.00 83,045,956.00 83,045,956.00
- 2,238,750.00 2,238,750.00 2,238,750.00 2,238,750.00 22,387,500.00 26,865,000.00 26,865,000.00 3,582,000.00 895,500.00
90%
44,838,140.00 44,838,140.00 44,838,140.00 369,466,273.60 501,111,052.64 501,111,052.64 501,111,052.64 501,111,052.64 501,111,052.64 501,111,052.64 501,111,052.64 501,111,052.64 501,111,052.64 501,111,052.64
496,383.94 37,228,795.37 37,228,795.37 75,450,358.61 52,616,697.45 52,616,697.45 52,616,697.45 52,616,697.45 52,616,697.45 52,616,697.45 52,616,697.45 52,616,697.45
1,193,973.05 89,547,978.87 - 91,935,924.97 - - - - - - - - -
- 95,328,816.92 95,328,816.92 95,328,816.92 95,328,816.92 95,328,816.92 95,328,816.92 95,328,816.92 95,328,816.92 95,328,816.92 95,328,816.92
323,865.00 16,070,500.00 16,394,365.00 30,501,563.50 30,501,563.50 30,501,563.50 30,501,563.50 30,501,563.50 30,501,563.50 30,501,563.50 30,501,563.50 30,501,563.50 30,501,563.50
- 165,000.00 5,500,000.00 5,500,000.00 5,500,000.00 8,250,000.00 8,250,000.00 8,250,000.00 8,250,000.00 107,250,000.00 8,085,000.00
- 153,642.40 5,121,413.33 5,121,413.33 5,121,413.33 7,682,120.00 7,682,120.00 7,682,120.00 7,682,120.00 99,867,560.00 7,528,477.60
- 50,625.00 1,687,500.00 1,687,500.00 1,687,500.00 2,531,250.00 2,531,250.00 2,531,250.00 2,531,250.00 32,906,250.00 2,480,625.00
80%
7,172,857.14 7,172,857.14 7,172,857.14 7,172,857.14 143,457,142.86 7,172,857.14 7,172,857.14 7,172,857.14 7,172,857.14 7,172,857.14 7,172,857.14 7,172,857.14 7,172,857.14 7,172,857.14 7,172,857.14 7,172,857.14 7,172,857.14 7,172,857.14 7,172,857.14 7,172,857.14
102,249,420.63
47,319,295.70 70%
13,876,786.55
2,074,579.59 2,074,579.59 13,876,786.55
45,069,435.49
45,009,951.59
11,025,741.76 11,025,741.76 12,188,446.75 124,283,487.96 9,784,749.09 9,784,749.09 9,784,749.09 9,784,749.09 9,784,749.09
13,825,500.36 13,825,500.36 12,595,210.25 12,595,210.25 92,424,892.26 12,595,210.25 12,595,210.25 12,595,210.25 12,595,210.25 12,595,210.25 9,629,358.53 9,629,358.53 9,629,358.53 9,629,358.53 9,629,358.53 9,629,358.53
61,046,825.38 28,300,570.45 28,300,570.45 28,300,570.45 21,987,829.11 21,987,829.11 21,987,829.11 21,987,829.11 21,987,829.11 21,987,829.11 21,987,829.11 21,987,829.11 21,987,829.11 21,987,829.11
20%
148,677.75 679,669.71 679,669.71 1,662,642.04 714,077.99 714,077.99 714,077.99 714,077.99 714,077.99 714,077.99
349,500.00 1,597,714.29 874,071.88 3,184,766.16 965,872.31 965,872.31 965,872.31 965,872.31 965,872.31 965,872.31
78,502,857.14 694,946,542.86 78,502,857.14 (86,549,400.00)
862,500.00 3,942,857.14 3,942,857.14 9,645,214.29 4,142,464.29 4,142,464.29 4,142,464.29 4,142,464.29 4,142,464.29 4,142,464.29
279,000.00 1,275,428.57 1,275,428.57 3,120,017.14 898,351.65 898,351.65 898,351.65 898,351.65 898,351.65 898,351.65 898,351.65 898,351.65 898,351.65
48,310,976.83 120,777,442.08 120,777,442.08 120,777,442.08 120,777,442.08 120,777,442.08 120,777,442.08 547,524,404.10 547,524,404.10 547,524,404.10
10%
1,142,250.00 5,221,714.29 3,617,686.39 11,169,590.67 3,617,686.39 3,617,686.39 3,617,686.39 3,617,686.39 3,617,686.39 3,617,686.39 3,617,686.39 3,617,686.39 3,617,686.39
426,250.00 1,948,571.43 655,553.91 3,473,675.34 655,553.91 655,553.91 655,553.91 655,553.91 655,553.91 655,553.91 655,553.91 655,553.91 655,553.91
2,585,625.00 11,820,000.00 8,566,211.38 25,660,886.38 2,685,110.52 2,685,110.52 2,685,110.52 2,685,110.52 2,685,110.52 2,685,110.52 2,685,110.52 2,685,110.52 2,685,110.52
7,226,000.00 33,033,142.86 25,105,286.74 72,879,469.60 25,105,286.74 25,105,286.74 25,105,286.74 25,105,286.74 25,105,286.74 25,105,286.74 25,105,286.74 25,105,286.74 25,105,286.74
7,152,857.14 7,152,857.14 7,152,857.14 7,152,857.14 143,057,142.86 7,152,857.14 7,152,857.14 7,152,857.14 7,152,857.14 7,152,857.14 7,152,857.14 7,152,857.14 7,152,857.14 7,152,857.14 7,152,857.14 7,152,857.14 7,152,857.14 7,152,857.14 7,152,857.14 7,152,857.14 0%
464,030,860.74 1,175,467,098.33 1,362,548,243.02 359,594,203.50 416,346,242.14 456,362,073.63 448,749,573.63 14,325,714.29 14,325,714.29 1,522,048,514.18 1,710,376,733.44 1,778,564,622.92 1,784,387,037.51 1,810,690,244.17 1,643,471,247.61 1,267,332,578.92 1,758,197,179.07 1,814,116,989.84 1,295,783,733.90
3,647,051,559.19 4,822,518,657.52 6,185,066,900.54 6,544,661,104.04 6,544,661,104.04 6,961,007,346.17 7,417,369,419.80 7,866,118,993.43 7,880,444,707.72 7,894,770,422.00 9,416,818,936.18 11,127,195,669.62 12,905,760,292.54 14,690,147,330.05 16,500,837,574.22 18,144,308,821.84 19,411,641,400.75 21,169,838,579.83 22,983,955,569.67 24,279,739,303.57
6,489,983,493.90
-54,677,610.14