ACTION PLAN FISIK

PERIODE (JULI - AGUSTUS 2020)


ACTION PLAN FISIK
NO URAIAN PEKERJAAN Bobot (%) S/D MINGGU KE-31 RENC. S/D MINGGU-38 JUMLAH S/D MINGGU-38
Prestasi (%) Bobot (%) Prestasi (%) Bobot (%) Prestasi (%) Bobot (%)

I GEDUNG WORKSHOP TERPADU


PEKERJAAN PENDAHULUAN 0.423 100.00% 0.423 0.000% - 100.000% 0.423

BANGUNAN WORKSHOP TERPADU


I PEKERJAAN KAP/ATAP 23.214 74.219% 17.229 24.505% 5.688 98.724% 22.917
II PEKERJAAN PASANGAN / PARTISI 4.670 82.259% 3.842 0.000% - 82.259% 3.842
III PEKERJAAN PLAFOND / RAILLING 1.484 0.520% 0.008 0.000% - 0.520% 0.008
IV PEKERJAAN KERAMIK 3.980 49.761% 1.981 0.000% - 49.761% 1.981
V PEKERJAAN PENGECATAN 0.644 31.144% 0.200 0.000% - 31.144% 0.200
VI PEKERJAAN SANITASI + INSTALASI AIR 2.013 - 72.343% 1.456 72.343% 1.456
VII PEKERJAAN KUSEN / PINTU / JENDELA 3.054 21.505% 0.657 44.196% 1.350 65.701% 2.006
VIII PEKERJAAN PENGGANTUNG / PENGUNCI 0.369 - - -
IX PEKERJAAN ATAP 22.161 55.692% 12.342 9.722% 2.154 65.414% 14.496
X PEKERJAAN TERAS DEPAN , PARIT KELILING BANGUNAN 2.044 - - -
XI PEKERJAAN SIRING + PARIT SEBELAH SIRING - - - -
XII PEKERJAAN HALAMAN PARKIR 3.926 - - -
XIII PEKERJAAN INSTALASI LISTRIK LANTAI SATU 1.324 4.872% 0.064 64.934% 0.860 69.806% 0.924
XIV PANEL SDP I 0.680 - 65.152% 0.443 65.152% 0.443
XV PEKERJAAN FIRE ALARM 0.633 - - -
XVI PEKERJAAN PENANGKAL PETIR TERMASUK BIAYA PERIJINAN DISNAKER 0.209 - - -
XVII KESELAMATAN DAN KESEHATAN KERJA ( K3 ) 1.034 95.220% 0.985 0.000% - 95.220% 0.985
TOTAL GEDUNG WORKSHOP TERPADU 71.860 37.729 11.951 49.680

action plan-02 Grand Rekap 1 of 2


ACTION PLAN FISIK
NO URAIAN PEKERJAAN Bobot (%) S/D MINGGU KE-31 RENC. S/D MINGGU-38 JUMLAH S/D MINGGU-38
Prestasi (%) Bobot (%) Prestasi (%) Bobot (%) Prestasi (%) Bobot (%)
II. GEDUNG KULIAH TERPADU
I. PEKERJAAN ARSITEKTUR
A. PEKERJAAN PASANGAN DINDING 0.819 71.621% 0.586 23.532% 0.193 95.154% 0.779
B. PEKERJAAN LANTAI 3.516 75.443% 2.652 24.557% 0.863 100.000% 3.516
C. PEKERJAAN PINTU/JENDELA 2.399 82.605% 1.982 14.726% 0.353 97.330% 2.335
D. PEKERJAAN PLAFOND 0.898 92.891% 0.835 7.109% 0.064 100.000% 0.898
E. PEKERJAAN FINISHING 1.655 39.865% 0.660 60.135% 0.995 100.000% 1.655
F. PEKERJAAN SANITAIR 0.278 - 100.000% 0.278 100.000% 0.278
G. PEKERJAAN ATAP CANOPY 0.878 14.073% 0.124 0.000% - 14.073% 0.124
H. PEKERJAAN HALAMAN 1.767 35.293% 0.624 64.707% 1.143 100.000% 1.767
II. PEKERJAAN MEKANIKAL 13.027 25.618% 3.337 56.464% 7.356 82.082% 10.693
III. PEKERJAAN ELEKTRIKAL 1.872 10.033% 0.188 60.967% 1.141 71.000% 1.329
IV. KESELAMATAN DAN KESEHATAN KERJA ( K3 ) 1.031 95.207% 0.982 0.000% - 95.207% 0.982
TOTAL GEDUNG KULIAH TERPADU 28.140 11.969 12.387 24.355
JUMLAH 100.000 49.698 24.337 74.036

JUMLAH PROSENTASE MINGGUAN 49.698% 24.337% 74.036%


RENCANA RESCHEDULE S/D MINGGU INI 47.194% 26.077% 73.271%
KEMAJUAN/KETERLAMBATAN 2.504% -1.739% 0.765%

Balikpapan, 20 Juli 2020


Diajukan oleh :
Kontraktor Pelaksana,
PT. Kharisma Menara Abadi

A. Wididarno, ST
Site Operational Manager

action plan-02 Grand Rekap 2 of 2


ACTION PLAN FISIK

GEDUNG WORKSHOP TERPADU


: 05 / LPM / BPPT-KMA / I/2020
ACTION PLAN FISIK
S/D MINGGU KE-31 RENC. S/D MINGGU-38 JUMLAH S/D MINGGU-38
NO URAIAN PEKERJAAN Bobot (%)
Prestasi Prestasi
Bobot (%) Bobot (%) Prestasi (%) Bobot (%)
(%) (%)

I PEKERJAAN PENDAHULUAN 0.423 100.000% 0.423 0.000% - 100.000% 0.423

II GEDUNGWORKSHOP TERPADU
I PEKERJAAN KAP/ATAP 23.214 74.219% 17.229 24.505% 5.688 98.724% 22.917
II PEKERJAAN PASANGAN / PARTISI 4.670 82.259% 3.842 0.000% - 82.259% 3.842
III PEKERJAAN PLAFOND / RAILLING 1.484 0.520% 0.008 0.000% - 0.520% 0.008
IV PEKERJAAN KERAMIK 3.980 49.761% 1.981 0.000% - 49.761% 1.981
V PEKERJAAN PENGECATAN 0.644 31.144% 0.200 0.000% - 31.144% 0.200
VI PEKERJAAN SANITASI + INSTALASI AIR 2.013 - 72.343% 1.46 72.343% 1.456
VII PEKERJAAN KUSEN / PINTU / JENDELA 3.054 21.505% 0.657 44.196% 1.35 65.701% 2.006
VIII PEKERJAAN PENGGANTUNG / PENGUNCI 0.369 - - -
IX PEKERJAAN ATAP 22.161 55.692% 12.342 9.722% 2.15 65.414% 14.496
X PEKERJAAN TERAS DEPAN , PARIT KELILING BANGUNAN 2.044 - - -
XI PEKERJAAN SIRING + PARIT SEBELAH SIRING - - - -
XII PEKERJAAN HALAMAN PARKIR 3.926 - - -
XIII PEKERJAAN INSTALASI LISTRIK LANTAI SATU 1.324 4.872% 0.064 64.934% 0.86 69.806% 0.924
XIV PANEL SDP I 0.680 - 65.152% 0.44 65.152% 0.443
XV PEKERJAAN FIRE ALARM 0.633 - - -
XVI PEKERJAAN PENANGKAL PETIR TERMASUK BIAYA PERIJINAN DISNAKER 0.209 - - -
` XVII KESELAMATAN DAN KESEHATAN KERJA ( K3 ) 1.034 95.220% 0.985 0.000% - 95.220% 0.985
JUMLAH 71.860 37.729 11.951 49.680

action plan-02 Rekap Workshop 1 of 1


LOKASI : GEDUNG WORKSHOP TERPADU

BOBOT VOLUME PROSENTASE PEKERJAAN BOBOT PEKERJAAN


NO. URAIAN PEKERJAAAN SAT VOLUME SD M- SD M-
% SD M-31 TOTAL SD M-31 SD M-38 TOTAL SD M-38 TOTAL
38 31
1 2 3 4 5 6 7 8

I PEKERJAAN PENDAHULUAN
2 Pembersihan 1 m2 Lapangan dan Perataan termasuk kupas humus m² 1,666.81 0.412 1,666.81 1,666.81 100.00% 0.00% 100.00% 0.412 - 0.412
2.1 Pembersihan 1 m2 Lapangan dan Perataan termasuk kupas humus m² 105.43 0.011 105.43 105.43 100.00% 0.00% 100.00% 0.011 - 0.011
Jumlah I 0.423 0.423 - 0.423
II. BANGUNAN WORKSHOP TERPADU
I. PEKERJAAN KAP/ATAP
PEKERJAAN RANGKA ATAP BAJA + FINISHING CAT
- Lantai I (Elv. + 0.00)
1 Pek Angkur 4 M. 19 (P = 300) bh 136.00 0.084 37.20 - 37.20 27.35% 0.00% 27.35% 0.023 - 0.023
2 Pek. Base Plat 400 x 400 x 12 mm Kg 512.45 0.071 54.27 458.18 512.45 10.59% 89.41% 100.00% 0.008 0.064 0.071
3 Pek Grouting ttk 136.00 0.045 136.00 136.00 0.00% 100.00% 100.00% - 0.045 0.045
4 Pipa Baja OD 88,8 x 5mm (pipa dia. 3 Inch) - Posisi Kolom KD1 Kg 435.73 0.061 303.44 132.29 435.73 69.64% 30.36% 100.00% 0.042 0.018 0.061
5 Pipa Baja OD 273 x 9,3mm (pipa dia. 10 Inch) - Posisi Kolom KD1 Kg 18,316.25 2.548 14,698.93 3,617.31 18,316.25 80.25% 19.75% 100.00% 2.045 0.503 2.548
6 Pipa Baja OD 323,8 x 10,3mm (pipa dia. 12 Inch) - Posisi Kolom KD1 Kg 4,925.59 0.685 3,066.88 1,858.71 4,925.59 62.26% 37.74% 100.00% 0.427 0.259 0.685

- RL. 1 (Elevasi + 7.140) (Kuda-kuda Lengkung)


1 Pek Angkur 6 M. 22 (P = 400) bh 204.00 0.168 40.80 - 40.80 20.00% 0.00% 20.00% 0.034 - 0.034
2 Pek Base Plat 450 x 450 x 20 mm Kg 1,080.95 0.150 108.10 972.86 1,080.95 10.00% 90.00% 100.00% 0.015 0.135 0.150
3 Pek Angkur 4 M. 19 (P = 300) bh 204.00 0.126 40.80 - 40.80 20.00% 0.00% 20.00% 0.025 - 0.025
4 Pek. Base Plat 400 x 400 x 12 mm Kg 512.45 0.071 54.27 458.18 512.45 10.59% 89.41% 100.00% 0.008 0.064 0.071
5 Pek Grouting ttk 408.00 0.134 - 408.00 408.00 0.00% 100.00% 100.00% - 0.134 0.134
6 Pipa Baja OD 273 x 9,3mm (pipa dia. 10 Inch) - Posisi Kuda-Kuda KD1 s/d KD8 Kg 58,951.07 8.201 47,164.18 11,786.89 58,951.07 80.01% 19.99% 100.00% 6.561 1.640 8.201
7 Pipa Baja OD 114,10 x 6mm (pipa dia. 4 Inch) - Posisi Kuda-Kuda KD1 s/d KD8 Kg 2,693.60 0.375 2,291.82 401.77 2,693.60 85.08% 14.92% 100.00% 0.319 0.056 0.375
8 Pipa Baja OD 114,10 x 6mm (pipa dia. 4 Inch) - Posisi Bracing Kuda-Kuda BRA s/d BRH Kg 17,634.54 2.453 13,539.10 4,095.44 17,634.54 76.78% 23.22% 100.00% 1.883 0.570 2.453
9 Pipa Baja OD 88,8 x 5mm (pipa dia. 3 Inch) - Posisi Kuda-Kuda KD1 s/d KD8 Kg 11,424.48 1.589 9,662.50 1,761.98 11,424.48 84.58% 15.42% 100.00% 1.344 0.245 1.589
10 Pipa Baja OD 88,8 x 5mm (pipa dia. 3 Inch) - Posisi Bracing Kuda-Kuda BRA s/d BRH Kg 18,097.15 2.517 14,453.80 3,643.35 18,097.15 79.87% 20.13% 100.00% 2.011 0.507 2.517
11 Pipa Baja OD 60,3 x 4,5mm (pipa dia. 2 Inch) - Posisi Bracing Kuda-Kuda BRA s/d BRH Kg 1,706.66 0.237 1,220.61 486.04 1,706.66 71.52% 28.48% 100.00% 0.170 0.068 0.237
12 Lipped Chanel CNP 125x50x20x3,2mm - Posisi Gording / Purlin Rangka Atap Sisi Atas Kg 13,495.00 1.877 9,493.28 4,001.73 13,495.00 70.35% 29.65% 100.00% 1.321 0.557 1.877
13 Lipped Chanel CNP 150x65x20x3,2mm - Posisi Gording / Purlin Rangka Atap 3 Sisi BawahKg 4,029.24 0.561 2,727.82 1,301.42 4,029.24 67.70% 32.30% 100.00% 0.379 0.181 0.561

Accessories
14 Trekstang Besi dia. 12mm Polos, BJTP U24 - Posisi Ikatan Antar Gording / Purlin Kg 1,093.44 0.152 642.00 451.44 1,093.44 58.71% 41.29% 100.00% 0.089 0.063 0.152
15 Ikatan Angin dia. 16mm Polos, BJTP U24 - Posisi Ikatan Angin Kuda-Kuda Kg 2,406.65 0.335 1,380.66 1,025.98 2,406.65 57.37% 42.63% 100.00% 0.192 0.143 0.335
16 Plat Tebal 6mm - Koneksi Gording / Purlin Kg 1,024.32 0.142 - 1,024.32 1,024.32 0.00% 100.00% 100.00% - 0.142 0.142
17 Plat Tebal 8mm - Koneksi Gording / Purlin dan Koneksi Ikatan Angin Kg 366.96 0.051 220.18 146.79 366.96 60.00% 40.00% 100.00% 0.031 0.020 0.051
18 Plat Tebal 12mm - Koneksi Antar Kuda-Kuda KD2 s/d KD8 Kg 441.81 0.061 44.18 397.63 441.81 10.00% 90.00% 100.00% 0.006 0.055 0.061
19 Plat Tebal 10mm - Koneksi Antar Bracing Kuda-Kuda BRA s/d BRH Kg 2,030.89 0.283 1,218.53 812.36 2,030.89 60.00% 40.00% 100.00% 0.170 0.113 0.283

action plan-02 Progress Workshop 1 of 8


BOBOT VOLUME PROSENTASE PEKERJAAN BOBOT PEKERJAAN
NO. URAIAN PEKERJAAAN SAT VOLUME SD M- SD M-
% SD M-31 TOTAL SD M-31 SD M-38 TOTAL SD M-38 TOTAL
38 31
1 2 3 4 5 6 7 8
20 Plat Tebal 10mm - Koneksi Tutup Antar Bracing Kuda-Kuda BRA s/d BRH Kg 1,376.89 0.192 826.14 550.76 1,376.89 60.00% 40.00% 100.00% 0.115 0.077 0.192
21 Plat Tebal 10mm - Stiffner Tiang Kuda-Kuda KD1 Kg 152.72 0.021 91.63 61.09 152.72 60.00% 40.00% 100.00% 0.013 0.008 0.021
22 Jarum Keras dia. 16mm - Ikatan Angin Kuda-Kuda KD1 s/d KD8 Kg 156.80 0.022 156.80 156.80 0.00% 100.00% 100.00% - 0.022 0.022

Jumlah II 23.214 17.229 5.688 22.917


II. PEKERJAAN PASANGAN / PARTISI
- LANTAI SATU DAN DUA
1 Pemasangan dinding bata ringan tebal 7,5 cm m² 1,738.11 1.119 1,663.11 1,663.11 95.69% 0.00% 95.69% 1.071 - 1.071
2 Pemasangan dinding terawang (rooster) campuran 1PC:4PP m² 28.80 0.027 28.80 28.80 100.00% 0.00% 100.00% 0.027 - 0.027
3 Pemasangan Acian m² 3,472.03 0.697 3,472.03 3,472.03 100.00% 0.00% 100.00% 0.697 - 0.697
4 Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi m² 513.60 0.317
5 Dinding partisi ( Calsiboard + Finishing Cat) : untuk ruang kuliah dalam m² 513.60 0.370
6 Pembuatan 1 m1 kolom - balok praktis beton bertulang (11x11) m' 1,157.35 0.715 1,157.35 1,157.35 100.00% 0.00% 100.00% 0.715 - 0.715
6.1 Pemasangan Plesteran Dinding m² 3,472.03 1.014 3,224.65 3,224.65 92.88% 0.00% 92.88% 0.941 - 0.941
6.2 Pek. Perapihan Exposed beton (Balok Dan Kolom) m² 1,328.92 0.411 1,262.48 1,262.48 95.00% 0.00% 95.00% 0.390 - 0.390
Jumlah III 4.670 3.842 - 3.842
III. PEKERJAAN PLAFOND / RAILLING
Pekerjaan Lantai - 1
1 Pas.Plafond Gypsum tebal 9 mm ( Pre Funtion ) m2 20.10 0.006
2 Pas. Rangka hollow 40/40 ( Pre Funtion ) m2 20.10 0.007
3 Pas.Cornice Gypsum ( Pre Function ). m2 17.21 0.002
4 Pas.Plafond Gypsum tebal 9 mm ( R.Rias ) m2 24.45 0.007
5 Pas. Rangka hollow 40/40 ( R.Rias ) m2 24.45 0.008
6 Pas.Cornice Gypsum ( R.Rias ). m2 18.60 0.002
7 Pas.Plafond Gypsum tebal 9 mm ( as.X9 ) m2 56.00 0.016
8 Pas.Rangka hollow 40/40 ( as.X9 ) m2 56.00 0.018
9 Pas.Cornice Gypsum ( as.X9 ). m2 30.00 0.003
10 Pek. Perapihan Exposed beton ( as.X9 ) m2 35.76 0.011
10.1 Pek. Perapihan Exposed beton ( Dibawah Lantai 1 Bawah Tribun ) m2 483.43 0.149
11 Pas.Plafond Calsiboard 6 mm ( as.Y3 - Y4 ) m2 48.55 0.014
12 Pas. Rangka hollow 40/40 ( as.Y3 - Y4 ) m2 48.55 0.016
13 Pas.Cornice Gypsum ( as.Y3 - Y4 ). m2 57.32 0.006
14 Pas.Plafond Calsiboard 6 mm ( R.Panel ) m2 2.38 0.001
15 Pas. Rangka hollow 40/40 ( R.Panel ) m2 2.38 0.001
16 Pas.Cornice Gypsum ( R.Panel ). m2 3.11 0.000
17 Pas.Plafond Calsiboard 6 mm ( Janitor ) m2 1.53 0.000
18 Pas. Rangka hollow 40/40 ( Janitor ) m2 1.53 0.001
19 Pas.Cornice Gypsum ( Janitor ). m2 3.50 0.000
20 Pas.Plafond Calsiboard 6 mm ( as.Y14 - Y15 ) m2 48.55 0.014
21 Pas. Rangka hollow 40/40 ( as.Y14 - Y15 ) m2 48.55 0.016
22 Pas.Cornice Gypsum ( as.Y14 - Y15 ). m2 57.32 0.006
23 Pas.Plafond Gypsum tebal 9 mm ( Kantin ) m2 33.17 0.010
24 Pas. Rangka hollow 40/40 ( Kantin ) m2 33.17 0.011
25 Pas.Cornice Gypsum ( Kantin ). m2 29.36 0.003
action plan-02 Progress Workshop 2 of 8
BOBOT VOLUME PROSENTASE PEKERJAAN BOBOT PEKERJAAN
NO. URAIAN PEKERJAAAN SAT VOLUME SD M- SD M-
% SD M-31 TOTAL SD M-31 SD M-38 TOTAL SD M-38 TOTAL
38 31
1 2 3 4 5 6 7 8
26 Pas.Plafond Gypsum tebal 9 mm ( R.VIP ) m2 40.27 0.012
27 Pas. Rangka hollow 40/40 ( R.VIP ) m2 40.27 0.013 23.41 23.41 58.13% 0.00% 58.13% 0.008 - 0.008
28 Pas.Cornice Gypsum ( R.VIP ). m2 14.71 0.002
29 List Plafond Profil U m 339.06 0.042
Sub Total - Pekerjaan Lantai - 1 : 0.396 0.008 - 0.008
Pekerjaan Lantai - 2
1 Pas.Plafond Gypsum tebal 9 mm ( Gudang ). m2 374.48 0.108
2 Pas. Rangka hollow 40/40 ( Gudang ). m2 374.48 0.123
3 Pas.Cornice Gypsum ( Gudang ). m1 182.90 0.019
4 List Plafond Profil U m' 93.06 0.011
5 Railling Tangga + Void Stainless Steel m' 160.60 0.827
Sub Total - Pekerjaan Lantai - 2 : 1.089 - - -
Jumlah III 1.484 0.008 - 0.008
IV. PEKERJAAN KERAMIK
- LANTAI SATU DAN DUA
1 Pemasangan 1 m2 lantai keramik ukuran 60cm x 60cm m² 1,056.59 2.250 930.16 930.16 88.03% 0.00% 88.03% 1.981 - 1.981
2 Pemasangan 1 m2 lantai keramik ukuran 40cm x 40cm m² 102.09 0.159
3 Pemasanga keramik tangga ke stage & lantai 2 m² 77.77 0.166
4 Keramik dinding 20/25 KM/WC m² 343.90 0.476
5 Pemasangan 1 m2 floor harderner m² 1,672.89 0.930
Jumlah IV 3.980 1.981 - 1.981
V. PEKERJAAN PENGECATAN
LANTAI 1
1 Pek.Pengecatan dinding dalam m² 615.03 0.118 337.94 337.94 54.95% 0.00% 54.95% 0.065 - 0.065
2 Pek.Pengecatan dinding luar m² 618.60 0.149 222.88 222.88 36.03% 0.00% 36.03% 0.054 - 0.054
3 Pek. Pengecatan Plafond m² 274.99 0.053
LANTAI 2
1 Pek.Pengecatan dinding dalam m² 1,315.83 0.252 427.64 427.64 32.50% 0.00% 32.50% 0.082 - 0.082
2 Pek. Pengecatan Plafond m² 374.48 0.072
Jumlah V 0.644 0.200 - 0.200
VI. PEKERJAAN SANITASI + INSTALASI AIR
1 Closet Duduk + Perlengkapan Accessories unit 16.00 0.247 16.00 16.00 0.00% 100.00% 100.00% - 0.247 0.247
2 Urinoir + Perlengkapan Accessories unit 12.00 0.173 12.00 12.00 0.00% 100.00% 100.00% - 0.173 0.173
3 Pemasangan Wastafel unit 10.00 0.082 10.00 10.00 0.00% 100.00% 100.00% - 0.082 0.082
4 Meja Wastafel + Granit unit 10.00 0.165 10.00 10.00 0.00% 100.00% 100.00% - 0.165 0.165
5 Kaca Cermin + Gantungan Handuk unit 10.00 0.041 - - 0.00% 0.00% 0.00% - - -
6 Penyekat KM/WC Panel Alumunium Rangka Alumunium m² 46.80 0.386 46.80 46.80 0.00% 100.00% 100.00% - 0.386 0.386
7 Septictank + Peresapan (Beli Jadi) Kapasitas 100 Orang (biofill) dg Asesories Lengkap unit
- Septictank BioFill, Cap. 3,5 m3 Unit 4.00 0.288 - 0.00% 0.00% 0.00% - - -
- Galian Tanah m3 25.19 0.008 - 0.00% 0.00% 0.00% - - -
- Buangan Tanah Galian m3 9.99 0.002 - 0.00% 0.00% 0.00% - - -
- Pengurugan dengan pasir urug m3 0.50 0.001 - 0.00% 0.00% 0.00% - - -
- Pas Bata Ringan, t=7.5 cm m2 42.00 0.027 - 0.00% 0.00% 0.00% - - -

action plan-02 Progress Workshop 3 of 8


BOBOT VOLUME PROSENTASE PEKERJAAN BOBOT PEKERJAAN
NO. URAIAN PEKERJAAAN SAT VOLUME SD M- SD M-
% SD M-31 TOTAL SD M-31 SD M-38 TOTAL SD M-38 TOTAL
38 31
1 2 3 4 5 6 7 8
- Pas Plesteran m2 42.00 0.012 - 0.00% 0.00% 0.00% - - -
- Pas. Beton K-225 m3 1.46 0.007 - 0.00% 0.00% 0.00% - - -
- Pembesian kg 240.06 0.016 - 0.00% 0.00% 0.00% - - -
- Bekesting m2 14.56 0.014 - 0.00% 0.00% 0.00% - - -
8 Tempat Wudhu + Accessories bh 8.00 0.016 - - 0.00% 0.00% 0.00% - - -
9 Instalasi Air Kotoran 4 " m' 110.00 0.091 110.00 110.00 0.00% 100.00% 100.00% - 0.091 0.091
10 Instalasi Air Kotor 3 " m' 310.00 0.204 310.00 310.00 0.00% 100.00% 100.00% - 0.204 0.204
11 Instalasi Air Bersih 1/2 " m' 470.00 0.077 470.00 470.00 0.00% 100.00% 100.00% - 0.077 0.077
12 Floor Drain Bh 30.00 0.031 30.00 30.00 0.00% 100.00% 100.00% - 0.031 0.031
13 Penyambungan dari Pipa Induk PDAM Ls 1.00 0.021 - 0.00% 0.00% 0.00% - - -
14 Pompa Transfer NS Basic 5-33 Ls 1.00 0.103 - 0.00% 0.00% 0.00% - - -
Jumlah VI 2.013 - 1.456 1.456
VII. PEKERJAAN KUSEN / PINTU / JENDELA
1 Kusen Alumunium m' 898.05 0.499 788.26 109.79 898.05 87.77% 12.23% 100.00% 0.438 0.061 0.499
2 Pintu Type P1 (uk 80 x 210 cm) 7 unit m² 11.76 0.097
3 Pintu Type P2 (uk 75 x 210 cm) 6 unit m² 9.45 0.078
4 Pintu Type P3 (uk 70 x 210 cm) 8 unit m² 11.76 0.097
6 Pintu Type P4 (uk 65 X 210 cm) 3 unit m² 4.10 0.034
7 Pintu Type PD1 (uk 160 x 180 cm) 4 unit m² 11.52 0.095
8 Pintu Type PD1.A (uk 160 x 210 cm) 2 unit m² 6.72 0.055
9 Pintu Type PD2 (uk 130 x 210 cm) 5 unit m² 13.65 0.112
10 Pintu Type PD3 (uk 150 x 210 cm) 4 unit m² 12.60 0.104
11 Pintu Type PD4 (uk 100 x 210 cm) 2 unit m² 2.10 0.017
12 Jendela Type J1 (uk 60 x 115 cm) 38 unit m² 26.22 0.189 17.78 8.45 26.22 67.79% 32.21% 100.00% 0.128 0.061 0.189
13 Jendela Type V1 (uk 60 x 40 cm) 26 unit m² 6.24 0.045 6.24 6.24 0.00% 100.00% 100.00% - 0.045 0.045
14 Bouven Pintu (uk 60 x 40 cm ) 92 unit m² 22.08 0.136 22.08 22.08 0.00% 100.00% 100.00% - 0.136 0.136
15 Louvre Aluminium Type L1 (uk 135 x 190 cm) 64 unit m' 2,208.00 1.137 175.50 2,032.50 2,208.00 7.95% 92.05% 100.00% 0.090 1.046 1.137
16 Louvre Aluminium Type L2 (uk 195 x 50 cm) 40 unit m' 696.00 0.358
Jumlah VII 3.054 0.657 1.350 2.006
VIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pintu Type P1 (uk 80 x 210 cm) 7 unit
- Kunci Pintu bh 7.00 0.012
- Engsel bh 21.00 0.006
- Handle Pintu bh 7.00 0.007
2 Pintu Type P2 (uk 75 x 210 cm) 6 unit
- Kunci Pintu bh 6.00 0.010
- Engsel bh 18.00 0.005
- Handle Pintu bh 6.00 0.006
3 Pintu Type P3 (uk 70 x 210 cm) 8 unit
- Kunci Pintu bh 8.00 0.013
- Engsel bh 24.00 0.007
- Handle Pintu bh 8.00 0.008

action plan-02 Progress Workshop 4 of 8


BOBOT VOLUME PROSENTASE PEKERJAAN BOBOT PEKERJAAN
NO. URAIAN PEKERJAAAN SAT VOLUME SD M- SD M-
% SD M-31 TOTAL SD M-31 SD M-38 TOTAL SD M-38 TOTAL
38 31
1 2 3 4 5 6 7 8
4 Pintu Type P4 (uk 65 X 210 cm) 3 unit
- Kunci Pintu bh 3.00 0.005
- Engsel bh 9.00 0.003
- Handle Pintu bh 3.00 0.003
5 Pintu Type PD1 (uk 160 x 180 cm) 4 unit
- Kunci Pintu bh 4.00 0.007
- Engsel bh 24.00 0.007
- Handle Pintu bh 8.00 0.008
- Grendel Pintu bh 8.00 0.005
6 Pintu Type PD1.A (uk 160 x 210 cm) 2 unit
- Kunci Pintu bh 2.00 0.003
- Engsel bh 12.00 0.003
- Handle Pintu bh 4.00 0.004
- Grendel Pintu bh 4.00 0.002
7 Pintu Type PD2 (uk 130 x 210 cm) 5 unit
- Kunci Pintu bh 5.00 0.008
- Engsel bh 15.00 0.004
- Handle Pintu bh 10.00 0.010
- Grendel Pintu bh 10.00 0.006
8 Pintu Type PD3 (uk 150 x 210 cm) 4 unit
- Kunci Pintu bh 4.00 0.007
- Engsel bh 12.00 0.003
- Handle Pintu bh 8.00 0.008
- Grendel Pintu bh 8.00 0.005
9 Pintu Type PD4 (uk 100 x 210 cm) 2 unit
- Kunci Pintu bh 2.00 0.003
- Engsel bh 6.00 0.002
- Handle Pintu bh 4.00 0.004
- Grendel Pintu bh 4.00 0.002
10 Jendela Type J1 (uk 60 x 115 cm) 38 unit
- Kunci Jendela bh 76.00 0.017
- Handle Jendela bh 38.00 0.006
- Spring Knip bh 76.00 0.020
11 Jendela Type V1 (uk 60 x 40 cm) 26 unit
- Kunci Jendela bh 52.00 0.012
- Handle Jendela bh 26.00 0.004
- Spring Knip bh 52.00 0.014
12 Bouven Pintu
- Kunci Jendela bh 184.00 0.042
- Handle Jendela bh 92.00 0.015
- Spring Knip bh 184.00 0.049

Jumlah VIII 0.369 - - -

action plan-02 Progress Workshop 5 of 8


BOBOT VOLUME PROSENTASE PEKERJAAN BOBOT PEKERJAAN
NO. URAIAN PEKERJAAAN SAT VOLUME SD M- SD M-
% SD M-31 TOTAL SD M-31 SD M-38 TOTAL SD M-38 TOTAL
38 31
1 2 3 4 5 6 7 8
IX. PEKERJAAN ATAP.
1 Pek. Pas. Atap Panel Plat ACP,Finishing Cat Enamel m2 3,932.52 15.954 2,406.40 393.25 2,799.65 61.19% 10.00% 71.19% 9.762 1.595 11.358
2 Pek. Pas. Aluminium foil Double Sided, Wire Mesh 50 x 50 m2 3,932.52 1.377 393.25 393.25 0.00% 10.00% 10.00% - 0.138 0.138
3 Pas.Talang GRC + Penggantung. m1 190.00 0.117
2
4 Pas.Dinding ACP m 1,038.60 4.213 635.80 103.86 739.66 61.22% 10.00% 71.22% 2.579 0.421 3.001
5 Pek. Pas. Rangka atap teras + Finishing Cat m2 153.00 0.126
6 Pas.Lisplang ACP Teras m2 92.04 0.373
Jumlah IX 22.161 12.342 2.154 14.496
X. PEKERJAAN TERAS DEPAN , PARIT KELILING BANGUNAN
(TRITISAN)
1 Parit Beton Bertulang U50
Galian Tanah m³ 51.50 0.016
Lantai Kerja Tebal 5 cm m³ 10.30 0.045
Beton K300 m³ 49.44 0.285
Besi Beton Kg 5,178.20 0.350
Bekisting m² 515.00 0.483
2 Lantai Carport + Ram Teras + Samping dari Batu Koral Jagung m² 117.20 0.169
3 Pekerjaan Beton Tangga Keliling Bangunan + Ram
Beton K300 m³ 37.80 0.218
Besi Beton Kg 1,406.16 0.095
Bekisting m² 453.60 0.382
Jumlah X 2.044 - - -

XI. PEKERJAAN HALAMAN PARKIR


1 Penyiapan Lahan + Pemadatan m² 1,863.70 0.192
2 Beton mutu rendah dengan f'c =9,8 Mpa (K125) Tebal 5 cm m³ 93.19 0.483
3 Perkerasan Beton Semen f'c =26,4 Mpa (K300) Tebal 25 cm m³ 465.93 2.687
4 Pembesian kg 7,103.69 0.481
5 Bekesting m² 90.00 0.084
Jumlah XI 3.926 - - -
XII. PEKERJAAN INSTALASI LISTRIK
1 Instalasi Penerangan Ttk 270.00 0.334 28.20 241.80 270.00 10.44% 89.56% 100.00% 0.035 0.299 0.334
2 Instalasi Stop Kontak Ttk 52.00 0.064 24.00 28.00 52.00 46.15% 53.85% 100.00% 0.030 0.035 0.064
3 Lampu RM 300 TL-D 2x36 W Mirror Louvre bh 20.00 0.070 20.00 20.00 0.00% 100.00% 100.00% - 0.070 0.070
4 Lampu TK TG 1x36-TL-D 2x36 W bh 54.00 0.100 54.00 54.00 0.00% 100.00% 100.00% - 0.100 0.100
6 Lampu DL RD 150 E-27 PL-E 1x18 W bh 15.00 0.014 15.00 15.00 0.00% 100.00% 100.00% - 0.014 0.014
7 Lampu DL RD 125 E-27 PL-E 1x18 W bh 24.00 0.022 24.00 24.00 0.00% 100.00% 100.00% - 0.022 0.022
8 Lampu DL SMD 150 E-27 PL-E 1x18 W bh 86.00 0.080 86.00 86.00 0.00% 100.00% 100.00% - 0.080 0.080
9 Lampu High Bay HPL N1x250W 20.00 0.058
10 Lampu Keluar bh 4.00 0.025
11 Lampu ROSET SL 1x18 W bh 7.00 0.006
12 Lampu Sorot Zeus IZX 1x400 W bh 40.00 0.066

action plan-02 Progress Workshop 6 of 8


BOBOT VOLUME PROSENTASE PEKERJAAN BOBOT PEKERJAAN
NO. URAIAN PEKERJAAAN SAT VOLUME SD M- SD M-
% SD M-31 TOTAL SD M-31 SD M-38 TOTAL SD M-38 TOTAL
38 31
1 2 3 4 5 6 7 8
13 Stop Kontak 250 Watt bh 52.00 0.013 52.00 52.00 0.00% 100.00% 100.00% - 0.013 0.013
14 Stop Kontak AC 2500 Watt bh 9.00 0.006 9.00 9.00 0.00% 100.00% 100.00% - 0.006 0.006
15 Saklar Tunggal bh 16.00 0.004 16.00 16.00 0.00% 100.00% 100.00% - 0.004 0.004
16 Saklar Ganda bh 25.00 0.007 25.00 25.00 0.00% 100.00% 100.00% - 0.007 0.007
17 Saklar Triple bh 3.00 0.001 3.00 3.00 0.00% 100.00% 100.00% - 0.001 0.001
18 Saklar Tukar Tunggal bh 4.00 0.003 4.00 4.00 0.00% 100.00% 100.00% - 0.003 0.003
19 Panel Lantai 1 lengkap Isi + Arde + accessoris unit 1.00 0.103 1.00 1.00 0.00% 100.00% 100.00% - 0.103 0.103
20 Panel Lantai 2 lengkap Isi + Arde + accessoris unit 1.00 0.103 1.00 1.00 0.00% 100.00% 100.00% - 0.103 0.103
21 Kabel NYY ø 4 x 25 MM² ke Panel SDP1 m¹ 12.00 0.009
22 AC Split 1/2 PK lengkap terpasang bh 9.00 0.148
23 Exhaust Fan bh 17.00 0.088
Jumlah XII 1.324 0.064 0.860 0.924
XIII. PANEL SDP I
1 Panel SDP Lengkap Isi + Arde Bh 1.00 0.227 1.00 1.00 0.00% 100.00% 100.00% - 0.227 0.227
2 Kabel NYY ø 4 x 35 MM² ke Tiang PLN m¹ 100.00 0.103 50.00 50.00 0.00% 50.00% 50.00% - 0.051 0.051
3 Kabel NYY ø 4 x 35 MM² ke Genset m¹ 50.00 0.051 25.00 25.00 0.00% 50.00% 50.00% - 0.026 0.026
4 Penyambungan daya ke PLN 45000 Watt Ls 1.00 0.278 0.50 0.50 0.00% 50.00% 50.00% - 0.139 0.139
5 Material + Alat bantu Ls 1.00 0.021
Jumlah XIII 0.680 - 0.443 0.443
XIV. PEKERJAAN FIRE ALARM
A. PERALATAN UTAMA
1 Master Control Panel Fire Alarm 15 Zone c/w Rectifier & Battery Nicad unit 1.00 0.268
2 Announcer Panel 5 Zone unit 1.00 0.010
3 Main Distribution Frame bh 2.00 0.025
4 Kabel dari MCFA ke MDF NYY 30 x 1,5 mm m 20.00 0.012
5 Grounding Ls 1.00 0.012
6 Testing Ls 1.00 0.012
B. INSTALASI FIRE ALARM LANTAI SATU
1 Instalasi Dectector + Bell + Push Button + Lampu Glass Ttk 25.00 0.031
2 Heat Dectector Bh 15.00 0.034
3 Smoke Detector Bh 4.00 0.007
4 Alarm Lamp Bh 2.00 0.005
5 Bell Bh 2.00 0.006
6 Manual Push Button Bh 2.00 0.004
7 Terminal Box TB-IF Ttk 1.00 0.004
8 EOL Bh 2.00 0.001
9 Kabel NYY ø 6 x 1 x 1,5 MM² dari MCFA ke TB-D m 60.00 0.007
10 Fire Extinguisher/Apar 3 Kg Bh 10.00 0.062
C. INSTALASI FIRE ALARM LANTAI DUA
1 Instalasi Dectector + Bell + Push Button + Lampu Glass Ttk 20.00 0.025
2 Heat Dectector Bh 12.00 0.027
3 Smoke Detector Bh 2.00 0.004
4 Alarm Lamp Bh 2.00 0.005

action plan-02 Progress Workshop 7 of 8


BOBOT VOLUME PROSENTASE PEKERJAAN BOBOT PEKERJAAN
NO. URAIAN PEKERJAAAN SAT VOLUME SD M- SD M-
% SD M-31 TOTAL SD M-31 SD M-38 TOTAL SD M-38 TOTAL
38 31
1 2 3 4 5 6 7 8
5 Bell Bh 2.00 0.006
6 Manual Push Button Bh 2.00 0.004
7 Terminal Box TB-IF Ttk 1.00 0.004
8 EOL Bh 2.00 0.001
9 Kabel NYY ø 6 x 1 x 1,5 MM² dari MCFA ke TB-D m 60.00 0.007
10 Fire Extinguisher/APAR 3 Kg Bh 8.00 0.049
Jumlah. XIV 0.633 - - -
XV. PEKERJAAN PENANGKAL PETIR TERMASUK BIAYA PERIZINAN DISNAKER
1 Electrode Static Air Terminal Merk Ex. Kurin lengkap tiang unit 1.00 0.138
2 Obstruction Lamp Led 10 Cd unit 1.00 0.008
3 Conentor (Caldwell sytem) bh 2.00 0.021
4 BC 70 Mm m¹ 16.00 0.005
5 Kabel NYM ø 3 x 2,5 Mm² m¹ 25.00 0.002
6 Kabel NYM ø 50 Mm² m¹ 25.00 0.021
7 Kabel BC 50 Mm² m¹ 31.00 0.006
8 Pool Box unit 1.00 0.004
9 Bak kontrol unit 1.00 0.004
Jumlah. XV 0.209 - - -

action plan-02 Progress Workshop 8 of 8


XVII. LINGKUP PEKERJAAN :K3
BOBOT VOLUME PROSENTASE PEKERJAAN BOBOT PEKERJAAN
NO URAIAN SAT. VOL
% SD M-31 SD M-38 TOTAL SD M-31 SD M-38 TOTAL SD M-31 SD M-38 TOTAL

1 Penyiapan RK3K Terdiri atas


a Pembuatan manual prosedur, instruksi kerja
dan izin kerja Set 1 0.033 1.00 1.00 100.00% 0.00% 100.00% 0.033 - 0.033
2 Sosialisasidan Promosi K3 terdiri atas :
a Spanduk (banner) Lb 2 0.008 2.00 2.00 100.00% 0.00% 100.00% 0.008 - 0.008
b Poster Lb 2 0.006 2.00 2.00 100.00% 0.00% 100.00% 0.006 - 0.006
c Papan Informasi K3 Bh 2 0.012 2.00 2.00 100.00% 0.00% 100.00% 0.012 - 0.012
3 Alat Pelindung Kerja terdiri atas :
a Jaring Pengaman Ls 1 0.206 1.00 1.00 100.00% 0.00% 100.00% 0.206 - 0.206
b Tali Keselamatan (lifeline) Ls 1 0.062 1.00 1.00 100.00% 0.00% 100.00% 0.062 - 0.062
c Pagar Pengaman (guard railling) Ls 1 0.268 1.00 1.00 100.00% 0.00% 100.00% 0.268 - 0.268
d Pembatas Area Ls 1 0.021 1.00 1.00 100.00% 0.00% 100.00% 0.021 - 0.021
4 Alat Pelindung Diri terdiri atas :
a Topi Perlindungan Bh 15 0.006 15.00 15.00 100.00% 0.00% 100.00% 0.006 - 0.006
b Pelindung Mata Psg 30 0.006 30.00 30.00 100.00% 0.00% 100.00% 0.006 - 0.006
c Pelindung Pernapasan dan Mulut (Masker) Psg 30 0.004 30.00 30.00 100.00% 0.00% 100.00% 0.004 - 0.004
d Sarung Tangan Psg 30 0.003 30.00 30.00 100.00% 0.00% 100.00% 0.003 - 0.003
e Sepatu Keselamatan Psg 15 0.031 15.00 15.00 100.00% 0.00% 100.00% 0.031 - 0.031
5 Asuransi dan Perijinan terdiri atas :
a BPJS Ketenagakerjaan dan Kesehatan Kerja
(Berdasarkan Kepmenaker No. Kep. 196/MEN/
1999, untuk Tenaga harian proyek) Ls 0.645 0.053 0.645 0.65 100.00% 0.00% 100.00% 0.053 - 0.053
6 Personil K3 terdiri atas :
a Ahli K3 OB 3 0.124 2.314 - 2.31 77.14% 0.00% 77.14% 0.095 - 0.095
b Petugas K3 OB 3 0.093 2.314 - 2.31 77.14% 0.00% 77.14% 0.071 - 0.071
7 Pasilitas sarana Kesehatan
a Peralatan P3K (Kotak P3K , Tandu, Tabung Ls 1 0.021 1.00 1.00 100.00% 0.00% 100.00% 0.021 - 0.021
Oksigen, Obat Luka, Perban dll.)

action plan-02 Progress K3 Workshop 1 of 2


BOBOT VOLUME PROSENTASE PEKERJAAN BOBOT PEKERJAAN
NO URAIAN SAT. VOL
% SD M-31 SD M-38 TOTAL SD M-31 SD M-38 TOTAL SD M-31 SD M-38 TOTAL

8 Rambu - Rambu terdiri atas :


a Rambu Petunjuk Bh 2 0.002 2.00 2.00 100.00% 0.00% 100.00% 0.0021 - 0.002
b Rambu Larangan Bh 2 0.002 2.00 2.00 100.00% 0.00% 100.00% 0.0021 - 0.002
c Rambu Peringatan Bh 2 0.002 2.00 2.00 100.00% 0.00% 100.00% 0.0021 - 0.002
d Rambu Kewajiban Bh 2 0.002 2.00 2.00 100.00% 0.00% 100.00% 0.0021 - 0.002
e Rambu Informasi Bh 2 0.002 2.00 2.00 100.00% 0.00% 100.00% 0.0021 - 0.002
9 Lain -Lain Terkait Pengendalian ResikoK3
a Alat Pemadam Api Ringan (APAR); 3,3 kg Bh 2 0.012 2.00 2.00 100.00% 0.00% 100.00% 0.012 - 0.012
b Bendera K3 Bh 2 0.008 2.00 2.00 100.00% 0.00% 100.00% 0.008 - 0.008
c Pelaporan dan Penyelidikan Insiden Ls 1 0.021 1.00 1.00 100.00% 0.00% 100.00% 0.021 - 0.021
10 Peralatan Penunjang Protokol Pencegahan COVID-19
a Alat Pengukur Suhu Badan (Termoscan) bh 1 0.010 1.00 1.00 100.00% 0.00% 100.00% 0.010 - 0.010
b Alat Semprot Disinfektan dan Obat Disinfektan set 1 0.001 1.00 1.00 100.00% 0.00% 100.00% 0.001 - 0.001
c Masker Wajah Untuk Pekerja, Staff dan Direksi bh 100 0.006 100.00 100.00 100.00% 0.00% 100.00% 0.006 - 0.006
d Tempat Cuci Tangan dan Sabun Antiseptik set 1 0.001 1.00 1.00 100.00% 0.00% 100.00% 0.001 - 0.001
e Hand Sanitizer bh 1 0.001 1.00 1.00 100.00% 0.00% 100.00% 0.001 - 0.001
f Obat-Obatan dan Vitamin ls 1 0.003 1.00 1.00 100.00% 0.00% 100.00% 0.003 - 0.003
g Oxygen Tub tub 1 0.001 1.00 1.00 100.00% 0.00% 100.00% 0.001 - 0.001
h Rambu-Rambu Sosialisasi Pencegahan COVID-19 ls 1 0.003 1.00 1.00 100.00% 0.00% 100.00% 0.003 - 0.003
TOTAL 1.034 0.985 - 0.985

action plan-02 Progress K3 Workshop 2 of 2


ACTION PLAN FISIK

GEDUNG KULIAH TERPADU


ACTION PLAN FISIK
S/D MINGGU KE-31 RENC. S/D MINGGU-38 JUMLAH S/D MINGGU-38
NO URAIAN PEKERJAAN Bobot (%)
Prestasi Prestasi
Bobot (%) Bobot (%) Prestasi (%) Bobot (%)
(%) (%)

GEDUNG KULIAH TERPADU

I. PEKERJAAN ARSITEKTUR
A PEKERJAAN PASANGAN DINDING
- Lantai Basement (Elevasi ± 0.00) 0.467 91.826% 0.428 8.174% 0.038 100.000% 0.467
- Lantai I (Elevasi ± 0.00) 0.249 35.339% 0.088 62.107% 0.154 97.446% 0.242
- Lantai II (Elevasi ± 4.00) 0.046 86.270% 0.040 0.000% - 86.270% 0.040
- Lantai III (Elevasi ± 8.00) 0.036 82.521% 0.030 0.000% - 82.521% 0.030
- Lantai IV (Elevasi ± 12.00) 0.021 0.000% - 0.000% - 0.000% -
Jumlah 0.819 0.586 0.193 0.779
B PEKERJAAN LANTAI
- Lantai Basement (Elevasi ± 0.00) 0.593 84.906% 0.504 15.094% 0.090 100.000% 0.593
- Lantai II (Elevasi ± 4.00) 0.345 88.869% 0.307 11.131% 0.038 100.000% 0.345
- Lantai III (Elevasi ± 8.00) 0.343 87.060% 0.299 12.940% 0.044 100.000% 0.343
- Lantai IV (Elevasi ± 12) 2.235 69.074% 1.543 30.926% 0.691 100.000% 2.235
Jumlah 3.516 2.652 0.863 3.516
C PEKERJAAN PINTU/JENDELA
- Lantai Basement (Elevasi ± 0.00) 0.570 87.862% 0.501 12.138% 0.069 100.000% 0.570
- Lantai I (Elevasi ± 0.00) 0.352 83.608% 0.294 16.392% 0.058 100.000% 0.352

action plan-02 Rekap Perkuliahan 1 of 3


ACTION PLAN FISIK
S/D MINGGU KE-31 RENC. S/D MINGGU-38 JUMLAH S/D MINGGU-38
NO URAIAN PEKERJAAN Bobot (%)
Prestasi Prestasi
Bobot (%) Bobot (%) Prestasi (%) Bobot (%)
(%) (%)
- Lantai II (Elevasi ± 4.00) 0.549 86.800% 0.476 5.378% 0.030 92.178% 0.506
- Lantai III (Elevasi ± 8.00) 0.550 89.345% 0.492 7.802% 0.043 97.148% 0.534
- Lantai IV (Elevasi ± 12.00) 0.378 57.863% 0.219 40.700% 0.154 98.563% 0.373
Jumlah 2.399 1.982 0.353 2.335
D PEKERJAAN PLAFOND
- Lantai Basement (Elevasi ± 0.00) 0.185 89.786% 0.166 10.214% 0.019 100.000% 0.185
- Lantai IV (Elevasi ± 12) 0.713 93.698% 0.668 6.302% 0.045 100.000% 0.713
Jumlah 0.898 0.835 0.064 0.898
E PEKERJAAN FINISHING
- Lantai Basement (Elevasi ± 0.00) 0.162 4.970% 0.008 95.030% 0.154 100.000% 0.162
- Lantai I (Elevasi ± 0.00) 0.086 30.000% 0.026 70.000% 0.060 100.000% 0.086
- Lantai II (Elevasi ± 4.00) 0.230 34.259% 0.079 65.741% 0.151 100.000% 0.230
- Lantai III (Elevasi ± 8.00) 0.577 43.713% 0.252 56.287% 0.325 100.000% 0.577
- Lantai IV (Elevasi ± 12) 0.599 49.182% 0.295 50.818% 0.305 100.000% 0.599
Jumlah 1.655 0.660 0.995 1.655
F PEKERJAAN SANITAIR
- Lantai Basement (Elevasi ± 0.00) 0.005 - 100.000% 0.005 100.000% 0.005
- Lantai I (Elevasi ± 0,00) 0.056 - 100.000% 0.056 100.000% 0.056
- Lantai II (Elevasi + 4,00) 0.056 - 100.000% 0.056 100.000% 0.056
- Lantai III (Elevasi + 8,00) 0.056 - 100.000% 0.056 100.000% 0.056
- Lantai IV (Elevasi ± 12.00) 0.106 - 100.000% 0.106 100.000% 0.106
Jumlah 0.278 - 0.278 0.278
G PEKERJAAN ATAP KANOPI DAN BESI 0.878 14.073% 0.124 0.000% - 14.073% 0.124
H PEKERJAAN HALAMAN 1.767 35.293% 0.624 64.707% 1.143 100.000% 1.767

II PEKERJAAN MEKANIKAL
A PEKERJAAN INSTALASI AIR BERSIH 0.024 - 100.000% 0.024 100.000% 0.024
B PEK. INSTALASI AIR BUANGAN, AIR KOTOR & AIR HUJAN 0.037 - 100.000% 0.037 100.000% 0.037
C PEKERJAAN INSTALASI AIR CONDITIONING (AC) 2.829 85.915% 2.431 0.000% - 85.915% 2.431

action plan-02 Rekap Perkuliahan 2 of 3


ACTION PLAN FISIK
S/D MINGGU KE-31 RENC. S/D MINGGU-38 JUMLAH S/D MINGGU-38
NO URAIAN PEKERJAAN Bobot (%)
Prestasi Prestasi
Bobot (%) Bobot (%) Prestasi (%) Bobot (%)
(%) (%)
D PEKERJAAN PEMADAM KEBAKARAN 0.142 - 100.000% 0.142 100.000% 0.142
E PEKERJAAN INSTALASI EXHAUST FAN 0.046 1.434% 0.001 89.606% 0.041 91.039% 0.042
F PEKERJAAN LIFT 9.949 9.108% 0.906 71.476% 7.111 80.584% 8.017

III. PEKERJAAN ELEKTRIKAL


A PEKERJAAN LANTAI BASEMENT (Elevasi - 4.00) 0.180 30.963% 0.056 65.367% 0.117 96.330% 0.173
B PEKERJAAN LANTAI - 2 (Elevasi ± 4.00) 0.039 - 100.000% 0.039 100.000% 0.039
C PEKERJAAN LANTAI - 3 (Elevasi ± 8.00) 0.423 - 99.026% 0.419 99.026% 0.419
D PEKERJAAN LANTAI - 4 (Elevasi ± 12.00) 1.231 10.739% 0.132 46.037% 0.567 56.776% 0.699

IV. KESEHATAN DAN KESELAMATAN KERJA ( K3 ) 1.031 95.207% 0.982 0.000% - 95.207% 0.982
a. JUMLAH 28.140 11.969 12.387 24.355

action plan-02 Rekap Perkuliahan 3 of 3


GEDUNG PERKULIAHAN TERPADU
BOBOT VOLUME PROSENTASE PEKERJAAN BOBOT PEKERJAAN
NO URAIAN PEKERJAAN SAT. VOLUME
SD M- SD M- SD M-
% SD M-38 TOTAL SD M-38 TOTAL SD M-38 TOTAL
31 31 31
1 2 3 4 7 8 9 10.000

I. PEKERJAAN ARSITEKTUR
A. PEKERJAAN PASANGAN DINDING
- Lantai Basement (Elevasi ± 0.00)
1 Balok latai 10/30 cm M' 46.72 0.029 41.53 5.19 46.72 88.90% 11.10% 100.00% 0.026 0.003 0.029
2 Kanopi Jendel beton t. 8 cm
- Pembesian Ø 10 - 15 cm Kg 160.76 0.011 160.76 - 160.76 100.00% 0.00% 100.00% 0.011 - 0.011
- Begesting M² 12.81 0.012 12.81 - 12.81 100.00% 0.00% 100.00% 0.012 - 0.012
-Pembuatan 1 m3 beton mutu fc 7,4 MPa M3 0.76 0.004 0.72 0.04 0.76 95.00% 5.00% 100.00% 0.004 0.000 0.004
3 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm M' 97.50 0.060 92.63 4.88 97.50 95.00% 5.00% 100.00% 0.057 0.003 0.060
4 Pembuatan 1 m2 ring balok beton bertulang (10x15) M' 37.84 0.023 37.84 - 37.84 100.00% 0.00% 100.00% 0.023 - 0.023
5 Pemasangan dinding HB10 campuran 1PC:4PP M² 193.99 0.125 192.98 1.01 193.99 99.48% 0.52% 100.00% 0.124 0.001 0.125
6 Pemasangan plesteran Dinding HB10 tebal 10 mm M² 349.31 0.102 347.16 2.15 349.31 99.38% 0.62% 100.00% 0.101 0.001 0.102
7 Pemasangan Acian M² 349.31 0.070 347.16 2.15 349.31 99.38% 0.62% 100.00% 0.070 0.000 0.070
8 Pemasangan Grill Besi M' 9.67 0.010 9.67 9.67 0.00% 100.00% 100.00% - 0.010 0.010
9 Pasangan dinding Keramik 20x25 (tempat wudhu) M² 14.51 0.020 14.51 14.51 0.00% 100.00% 100.00% - 0.020 0.020
0.467 0.428 0.038 0.467
- Lantai I (Elevasi ± 0.00)
1 Kolom Praktis 11/11 cm M' 95.20 0.059 95.20 - 95.20 100.00% 0.00% 100.00% 0.059 - 0.059
2 Pembuatan Fitur Disabilitas
- Besi Beton Ø 10 - 15 cm kg 71.63 0.005 71.63 71.63 0.00% 100.00% 100.00% - 0.005 0.005
- Begesting M² 6.60 0.006 6.60 6.60 0.00% 100.00% 100.00% - 0.006 0.006
- Cor Beton M3 0.89 0.004 0.89 0.89 0.00% 100.00% 100.00% - 0.004 0.004
- Keramik 30 x 30 (kasar) M² 4.59 0.006 4.59 4.59 0.00% 100.00% 100.00% - 0.006 0.006
- Pas. Guiding Block M² 1.35 0.002 1.35 1.35 0.00% 100.00% 100.00% - 0.002 0.002
- Railing Tangga Stainless steel (disabilitas) M' 9.61 0.059 9.61 9.61 0.00% 100.00% 100.00% - 0.059 0.059
- Railing Tangga Stainless steel (disabilitas) ke Basement M' 11.11 0.069 11.11 11.11 0.00% 100.00% 100.00% - 0.069 0.069
3 Pemasangan dinding HB10 campuran 1PC:4PP M² 19.95 0.013 19.95 - 19.95 100.00% 0.00% 100.00% 0.013 - 0.013
4 Pemasangan plesteran Dinding HB10 tebal 10 mm M² 39.90 0.012 32.97 6.94 39.90 82.62% 17.38% 100.00% 0.010 0.002 0.012
5 Pemasangan Acian M² 39.90 0.008 32.97 6.94 39.90 82.62% 17.38% 100.00% 0.007 0.001 0.008
6 Pas. Dinding Keramik 40x40 (pintu lift) M² 4.08 0.006
0.249 0.088 0.154 0.242

action plan-02 Progress Perkuliahan 1 of 18


BOBOT VOLUME PROSENTASE PEKERJAAN BOBOT PEKERJAAN
NO URAIAN PEKERJAAN SAT. VOLUME
SD M- SD M- SD M-
% SD M-38 TOTAL SD M-38 TOTAL SD M-38 TOTAL
31 31 31
1 2 3 4 7 8 9 10.000
- Lantai II (Elevasi ± 4.00)
1 Kolom Praktis 11/11 cm M' 10.50 0.006 10.50 10.50 100.00% 0.00% 100.00% 0.006 - 0.006
2 Pemasangan dinding HB10 campuran 1PC:4PP M² 20.52 0.013 20.52 20.52 100.00% 0.00% 100.00% 0.013 - 0.013
3 Pemasangan plesteran Dinding HB10 tebal 10 mm M² 41.04 0.012 41.04 41.04 100.00% 0.00% 100.00% 0.012 - 0.012
4 Pemasangan Acian M² 41.04 0.008 41.04 41.04 100.00% 0.00% 100.00% 0.008 - 0.008
5 Pas. Dinding Keramik 40x40 (pintu lift) M² 4.08 0.006
0.046 0.040 - 0.040
- Lantai III (Elevasi ± 8.00)
1 Kolom Praktis 11/11 cm M' 10.80 0.007 10.80 10.80 100.00% 0.00% 100.00% 0.007 - 0.007
2 Pemasangan dinding HB10 campuran 1PC:4PP M² 20.52 0.013 20.52 20.52 100.00% 0.00% 100.00% 0.013 - 0.013
3 Pemasangan plesteran Dinding HB10 tebal 10 mm M² 20.52 0.006 20.52 20.52 100.00% 0.00% 100.00% 0.006 - 0.006
4 Pemasangan Acian M² 20.52 0.004 20.52 20.52 100.00% 0.00% 100.00% 0.004 - 0.004
5 Pas. Dinding Keramik 40x40 (pintu lift) M² 4.08 0.006
0.036 0.030 - 0.030
- Lantai IV (Elevasi ± 12.00)
1 Kolom Praktis 11/11 cm M' 3.50 0.002
2 Pemasangan dinding HB10 campuran 1PC:4PP M² 7.42 0.005
3 Pemasangan plesteran Dinding HB10 tebal 10 mm M² 14.84 0.004
4 Pemasangan Acian M² 14.84 0.003
5 Pas. Dinding Keramik 40x40 (pintu lift) M² 4.08 0.006
0.021 - - -
TOTAL : I.A. PEKERJAAN PASANGAN DINDING 0.819 0.586 0.193 0.779
B PEKERJAAN LANTAI
- Lantai Basement (Elevasi ± 0.00)
1 Pemasangan 1 m2 lantai keramik ukuran 60cm x 60cm M² 260.86 0.555 236.60 24.26 260.86 90.70% 9.30% 100.00% 0.504 0.052 0.555
2 Pemasangan 1 m’ GranitoTile plint keramik ukuran 10cm x 60cm M' 131.50 0.038 131.50 131.50 0.00% 100.00% 100.00% - 0.038 0.038
0.593 0.504 0.090 0.593
- Lantai II (Elevasi ± 4.00)
1 Pemasangan 1 m2 lantai keramik ukuran 60cm x 60cm M² 154.96 0.330 144.00 10.96 154.96 92.93% 7.07% 100.00% 0.307 0.023 0.330
2 Pemasangan 1 m’ GranitoTile plint keramik ukuran 10cm x 60cm M' 52.28 0.015 52.28 52.28 0.00% 100.00% 100.00% - 0.015 0.015
0.345 0.307 0.038 0.345

action plan-02 Progress Perkuliahan 2 of 18


BOBOT VOLUME PROSENTASE PEKERJAAN BOBOT PEKERJAAN
NO URAIAN PEKERJAAN SAT. VOLUME
SD M- SD M- SD M-
% SD M-38 TOTAL SD M-38 TOTAL SD M-38 TOTAL
31 31 31
1 2 3 4 7 8 9 10.000
- Lantai III (Elevasi ± 8.00)
1 Pemasangan 1 m2 lantai keramik ukuran 60cm x 60cm M² 153.96 0.328 140.20 13.76 153.96 91.06% 8.94% 100.00% 0.299 0.029 0.328
2 Pemasangan 1 m’ GranitoTile plint keramik ukuran 10cm x 60cm M' 52.28 0.015 52.28 52.28 0.00% 100.00% 100.00% - 0.015 0.015
0.343 0.299 0.044 0.343
- Lantai IV (Elevasi ± 12)
1 Pemasangan 1 m2 lantai keramik ukuran 60cm x 60cm M² 786.26 1.674 717.62 68.64 786.26 91.27% 8.73% 100.00% 1.528 0.146 1.674
2 Pemasangan 1 m2 lantai keramik ukuran 60cm x 60cm Unpolish M' 145.46 0.310 145.46 145.46 0.00% 100.00% 100.00% - 0.310 0.310
3 Pemasangan 1 m2 lantai keramik KM/WC ukuran 30cm x 30cm M² 29.66 0.037 29.66 29.66 0.00% 100.00% 100.00% - 0.037 0.037
4 Pemasangan 1 m2 dinding keramik KM/WC 20cm x 25cm M² 74.04 0.102 11.11 62.93 74.04 15.00% 85.00% 100.00% 0.015 0.087 0.102
5 Pemasangan 1 m’ GranitoTile plint keramik ukuran 10cm x 60cm M' 302.93 0.087 302.93 302.93 0.00% 100.00% 100.00% - 0.087 0.087
6 Pemasangan 1 m' List Keramik Dinding ukuran 10 x 20 cm M' 42.47 0.009 42.47 42.47 0.00% 100.00% 100.00% - 0.009 0.009
7 Waterproofing Lantai KM/WC M² 29.66 0.015 29.66 29.66 0.00% 100.00% 100.00% - 0.015 0.015
2.235 1.543 0.691 2.235
TOTAL : I.B. PEKERJAAN LANTAI 3.516 2.652 0.863 3.516

C PEKERJAAN PINTU/JENDELA
- Lantai Basement (Elevasi ± 0.00)
1 PEK. PINTU TYPE P2. uk 150 x 260 CM (6 unit)
- Kusen Alumunium M' 50.40 0.028 47.88 2.52 50.40 95.00% 5.00% 100.00% 0.027 0.001 0.028
- Daun Pintu Alumunium + Kaca 8 mm M² 17.64 0.145 16.76 0.88 17.64 95.00% 5.00% 100.00% 0.138 0.007 0.145
- Kaca 5 mm M² 3.26 0.003 3.10 0.16 3.26 95.00% 5.00% 100.00% 0.003 0.000 0.003
- Kunci Pintu swing Alumunium bh 6.00 0.012 6.00 6.00 0.00% 100.00% 100.00% - 0.012 0.012
- Handle Pintu full set 6.00 0.010 6.00 6.00 0.00% 100.00% 100.00% - 0.010 0.010
- Engsel Pintu bh 36.00 0.015 34.20 1.80 36.00 95.00% 5.00% 100.00% 0.014 0.001 0.015
- Grendel Pintu bh 12.00 0.007 11.40 0.60 12.00 95.00% 5.00% 100.00% 0.007 0.000 0.007
- Door Closer bh 12.00 0.037 12.00 12.00 0.00% 100.00% 100.00% - 0.037 0.037

2 PEK. JENDELA TYPE J6. Uk 325 x 200 CM (5 unit)


- Kusen Alumunium M' 68.72 0.038 68.72 68.72 100.00% 0.00% 100.00% 0.038 - 0.038
- Jendela Type Alumunium + Kaca 5 mm M² 17.75 0.128 17.75 17.75 100.00% 0.00% 100.00% 0.128 - 0.128
- Kaca 5 m M² 6.00 0.005 6.00 6.00 100.00% 0.00% 100.00% 0.005 - 0.005
- Engsel Jendela Bh 24.00 0.005 24.00 24.00 100.00% 0.00% 100.00% 0.005 - 0.005
- Rambucis Bh 12.00 0.003 12.00 12.00 100.00% 0.00% 100.00% 0.003 - 0.003

action plan-02 Progress Perkuliahan 3 of 18


BOBOT VOLUME PROSENTASE PEKERJAAN BOBOT PEKERJAAN
NO URAIAN PEKERJAAN SAT. VOLUME
SD M- SD M- SD M-
% SD M-38 TOTAL SD M-38 TOTAL SD M-38 TOTAL
31 31 31
1 2 3 4 7 8 9 10.000

3 PEK. JENDELA TYPE J8. Uk 220 x 200 CM (5 unit)


- Kusen Alumunium M' 37.71 0.021 37.71 37.71 100.00% 0.00% 100.00% 0.021 - 0.021
- Jendela Type Alumunium + Kaca 5 mm M² 14.82 0.107 14.82 14.82 100.00% 0.00% 100.00% 0.107 - 0.107
- Kaca 5 mm M² 1.97 0.002 1.97 1.97 100.00% 0.00% 100.00% 0.002 - 0.002
- Engsel Jendela Bh 12.00 0.003 12.00 12.00 100.00% 0.00% 100.00% 0.003 - 0.003
- Rambucis Bh 6.00 0.001 6.00 6.00 100.00% 0.00% 100.00% 0.001 - 0.001

0.570 0.501 0.069 0.570


- Lantai I (Elevasi ± 0.00)
1 PEK. PINTU TYPE P2. uk 150 x 260 CM (1 unit)
- Kusen Alumunium M' 8.40 0.005 8.40 8.40 0.00% 100.00% 100.00% - 0.005 0.005
- Daun Pintu Alumunium + Kaca 8 mm M² 2.94 0.024 2.94 2.94 0.00% 100.00% 100.00% - 0.024 0.024
- Kaca 5 mm M² 0.54 0.000 0.54 0.54 0.00% 100.00% 100.00% - 0.000 0.000
- Kunci Pintu swing Alumunium bh 1.00 0.002 1.00 1.00 0.00% 100.00% 100.00% - 0.002 0.002
- Handle Pintu full set 1.00 0.002 1.00 1.00 0.00% 100.00% 100.00% - 0.002 0.002
- Engsel Pintu bh 6.00 0.002 6.00 6.00 0.00% 100.00% 100.00% - 0.002 0.002
- Grendel Pintu bh 2.00 0.001 2.00 2.00 0.00% 100.00% 100.00% - 0.001 0.001
- Door Closer bh 2.00 0.006 2.00 2.00 0.00% 100.00% 100.00% - 0.006 0.006

2 PEK. JENDELA TYPE J6. Uk 325 x 200 CM (8 unit)


- Kusen Alumunium M' 120.26 0.067 114.25 6.01 120.26 95.00% 5.00% 100.00% 0.064 0.003 0.067
- Jendela Type Alumunium + Kaca 5 mm M² 31.06 0.224 29.51 1.55 31.06 95.00% 5.00% 100.00% 0.213 0.011 0.224
- Kaca 5 mm M² 4.59 0.004 4.36 0.23 4.59 95.00% 5.00% 100.00% 0.004 0.000 0.004
- Engsel Jendela Bh 42.00 0.010 42.00 42.00 100.00% 0.00% 100.00% 0.010 - 0.010
- Rambucis Bh 21.00 0.005 21.00 21.00 100.00% 0.00% 100.00% 0.005 - 0.005

0.352 0.294 0.058 0.352

action plan-02 Progress Perkuliahan 4 of 18


BOBOT VOLUME PROSENTASE PEKERJAAN BOBOT PEKERJAAN
NO URAIAN PEKERJAAN SAT. VOLUME
SD M- SD M- SD M-
% SD M-38 TOTAL SD M-38 TOTAL SD M-38 TOTAL
31 31 31
1 2 3 4 7 8 9 10.000
- Lantai II (Elevasi ± 4.00)
1 PEK. PINTU TYPE P2. uk 150 x 260 CM (1 unit)
- Kusen Alumunium M' 8.40 0.005
- Daun Pintu Alumunium + Kaca 8 mm M² 2.94 0.024
- Kaca 5 mm M² 0.54 0.000
- Kunci Pintu swing Alumunium bh 1.00 0.002
- Handle Pintu full set 1.00 0.002
- Engsel Pintu bh 6.00 0.002
- Grendel Pintu bh 2.00 0.001
- Door Closer bh 2.00 0.006

2 PEK. JENDELA TYPE J6. Uk 325 x 200 CM (8 unit)


- Pekerjaan Kusen Alumunium M' 137.44 0.076 137.44 137.44 100.00% 0.00% 100.00% 0.076 - 0.076
- Jendela Type Alumunium + Kaca 5 mm M² 35.50 0.256 33.73 1.78 35.50 95.00% 5.00% 100.00% 0.243 0.013 0.256
- Kaca 5 mm M² 5.25 0.004 4.99 0.26 5.25 95.00% 5.00% 100.00% 0.004 0.000 0.004
- Engsel Jendela Bh 48.00 0.011 45.60 2.40 48.00 95.00% 5.00% 100.00% 0.010 0.001 0.011
- Rambucis Bh 24.00 0.005 22.80 1.20 24.00 95.00% 5.00% 100.00% 0.005 0.000 0.005

3 PEK. JENDELA TYPE J7. Uk 345 x 200 CM (1 unit)


- Kusen Alumunium M' 19.60 0.011 19.60 19.60 100.00% 0.00% 100.00% 0.011 - 0.011
- Jendela Type Alumunium + Kaca 5 mm M² 4.64 0.033 4.64 4.64 100.00% 0.00% 100.00% 0.033 - 0.033
- Kaca 5 mm M² 1.28 0.001 1.28 1.28 100.00% 0.00% 100.00% 0.001 - 0.001
- Engsel Jendela Bh 4.00 0.001 4.00 4.00 100.00% 0.00% 100.00% 0.001 - 0.001
- Rambucis Bh 2.00 0.000 2.00 2.00 100.00% 0.00% 100.00% 0.000 - 0.000

4 PEK. TERALIS JENDELA M² 103.12 0.106 87.89 15.24 103.12 85.22% 14.78% 100.00% 0.090 0.016 0.106

0.549 0.476 0.030 0.506

action plan-02 Progress Perkuliahan 5 of 18


BOBOT VOLUME PROSENTASE PEKERJAAN BOBOT PEKERJAAN
NO URAIAN PEKERJAAN SAT. VOLUME
SD M- SD M- SD M-
% SD M-38 TOTAL SD M-38 TOTAL SD M-38 TOTAL
31 31 31
1 2 3 4 7 8 9 10.000
- Lantai III (Elevasi ± 8.00)
1 PEK. PINTU TYPE P2. uk 150 x 260 CM (1 unit)
- Kusen Alumunium M' 8.40 0.005 8.40 8.40 0.00% 100.00% 100.00% - 0.005 0.005
- Daun Pintu Alumunium + Kaca 8 mm M² 2.94 0.024 2.94 2.94 0.00% 100.00% 100.00% - 0.024 0.024
- Kaca 5 mm M² 0.54 0.000 0.54 0.54 0.00% 100.00% 100.00% - 0.000 0.000
- Kunci Pintu swing Alumunium bh 1.00 0.002 1.00 1.00 0.00% 100.00% 100.00% - 0.002 0.002
- Handle Pintu full set 1.00 0.002 1.00 1.00 0.00% 100.00% 100.00% - 0.002 0.002
- Engsel Pintu bh 6.00 0.002 6.00 6.00 0.00% 100.00% 100.00% - 0.002 0.002
- Grendel Pintu bh 2.00 0.001 2.00 2.00 0.00% 100.00% 100.00% - 0.001 0.001
- Door Closer bh 2.00 0.006 2.00 2.00 0.00% 100.00% 100.00% - 0.006 0.006

2 PEK. JENDELA TYPE J6. Uk 325 x 200 CM (8 unit)


- Kusen Alumunium M' 137.44 0.076 137.44 137.44 100.00% 0.00% 100.00% 0.076 - 0.076
- Jendela Type Alumunium + Kaca 5 mm M² 35.50 0.256 35.50 35.50 100.00% 0.00% 100.00% 0.256 - 0.256
- Kaca 5 mm M² 5.25 0.004 5.25 5.25 100.00% 0.00% 100.00% 0.004 - 0.004
- Engsel Jendela Bh 48.00 0.011 48.00 48.00 100.00% 0.00% 100.00% 0.011 - 0.011
- Rambucis Bh 24.00 0.005 24.00 24.00 100.00% 0.00% 100.00% 0.005 - 0.005

3 PEK. JENDELA TYPE J7. Uk 345 x 200 CM (1 unit)


- Kusen Alumunium M' 19.60 0.011 19.60 19.60 100.00% 0.00% 100.00% 0.011 - 0.011
- Jendela Type Alumunium + Kaca 5 mm M² 4.64 0.033 4.64 4.64 100.00% 0.00% 100.00% 0.033 - 0.033
- Kaca 5 mm M² 1.28 0.001 1.28 1.28 100.00% 0.00% 100.00% 0.001 - 0.001
- Engsel Jendela Bh 8.00 0.002 8.00 8.00 100.00% 0.00% 100.00% 0.002 - 0.002
- Rambucis Bh 4.00 0.001 4.00 4.00 100.00% 0.00% 100.00% 0.001 - 0.001

4 PEK. TERALIS JENDELA M² 103.12 0.106 87.89 87.89 85.22% 0.00% 85.22% 0.090 - 0.090

0.550 0.492 0.043 0.534

action plan-02 Progress Perkuliahan 6 of 18


BOBOT VOLUME PROSENTASE PEKERJAAN BOBOT PEKERJAAN
NO URAIAN PEKERJAAN SAT. VOLUME
SD M- SD M- SD M-
% SD M-38 TOTAL SD M-38 TOTAL SD M-38 TOTAL
31 31 31
1 2 3 4 7 8 9 10.000
- Lantai IV (Elevasi ± 12.00)
1 PEK. PINTU TYPE P2. uk 150 x 260 CM (2 unit)
- Kusen Alumunium M' 25.20 0.014 23.94 1.26 25.20 95.00% 5.00% 100.00% 0.013 0.001 0.014
- Daun Pintu Alumunium + Kaca 8 mm M² 8.82 0.073 7.94 0.88 8.82 90.00% 10.00% 100.00% 0.065 0.007 0.073
- Kaca 5 mm M² 1.63 0.001 - 1.63 1.63 0.00% 100.00% 100.00% - 0.001 0.001
- Kunci Pintu swing Alumunium bh 3.00 0.006 3.00 3.00 0.00% 100.00% 100.00% - 0.006 0.006
- Handle Pintu full set 3.00 0.005 3.00 3.00 0.00% 100.00% 100.00% - 0.005 0.005
- Engsel Pintu bh 12.00 0.005 10.20 1.80 12.00 85.00% 15.00% 100.00% 0.004 0.001 0.005
- Grendel Pintu bh 6.00 0.004 6.00 6.00 0.00% 100.00% 100.00% - 0.004 0.004
- Door Closer bh 6.00 0.019 6.00 6.00 0.00% 100.00% 100.00% - 0.019 0.019

2 PEK. PINTU TYPE P3. uk 210 x 80 CM (5 unit)


- Kusen Alumunium M' 25.50 0.014 24.40 1.10 25.50 95.69% 4.31% 100.00% 0.014 0.001 0.014
- Daun Pintu Alumunium + Kaca 8 mm M² 8.40 0.055 7.56 0.84 8.40 90.00% 10.00% 100.00% 0.050 0.006 0.055
- Kunci Pintu bh 5.00 0.010 5.00 5.00 0.00% 100.00% 100.00% - 0.010 0.010
- Engsel Pintu bh 15.00 0.006 13.50 1.50 15.00 90.00% 10.00% 100.00% 0.006 0.001 0.006
- Door Closer bh 5.00 0.015 5.00 5.00 0.00% 100.00% 100.00% - 0.015 0.015

3 PEK. PINTU TYPE P4. uk 210 x 80 CM (4 unit)


- Kusen Alumunium M' 20.00 0.011 20.00 20.00 0.00% 100.00% 100.00% - 0.011 0.011
- Pintu Double Plywood M² 5.88 0.034 5.88 5.88 0.00% 100.00% 100.00% - 0.034 0.034
- Kunci Pintu bh 4.00 0.008 4.00 4.00 0.00% 100.00% 100.00% - 0.008 0.008
- Engsel Pintu bh 12.00 0.005 12.00 12.00 0.00% 100.00% 100.00% - 0.005 0.005
- Door Closer bh 4.00 0.012 4.00 4.00 0.00% 100.00% 100.00% - 0.012 0.012

4 PEK. TERALIS JENDELA M² 70.59 0.073 63.28 7.31 70.59 89.65% 10.35% 100.00% 0.065 0.008 0.073

action plan-02 Progress Perkuliahan 7 of 18


BOBOT VOLUME PROSENTASE PEKERJAAN BOBOT PEKERJAAN
NO URAIAN PEKERJAAN SAT. VOLUME
SD M- SD M- SD M-
% SD M-38 TOTAL SD M-38 TOTAL SD M-38 TOTAL
31 31 31
1 2 3 4 7 8 9 10.000

5 PEK. JENDELA TYPE PS. Uk 300 x 170 CM (2 unit)


- Kusen Alumunium M' 3.50 0.002 3.50 3.50 100.00% 0.00% 100.00% 0.002 - 0.002
- Pintu Alumunium + Spandrell M² 0.65 0.004
- Rambucis bh 2.00 0.000
- Engsel Pintu bh 3.00 0.001

0.378 0.219 0.154 0.373


TOTAL : I.C. PEKERJAAN PINTU/JENDELA 2.399 1.982 0.353 2.335

D. PEKERJAAN PLAFOND
- Lantai Basement (Elevasi ± 0.00)
1 Pemasangan 1 m2 Rangka Besi Hollow Modul 60x60 cm Plafond M² 268.02 0.088 266.00 2.02 268.02 99.25% 0.75% 100.00% 0.088 0.001 0.088
2 Pemasangan 1 m2 Langit-langit Calsiboard (120x240x9) tebal 3,5 mm M² 268.02 0.077 239.40 28.62 268.02 89.32% 10.68% 100.00% 0.069 0.008 0.077
3 Pemasangan 1 m’ list langit-langit Gypsum kecil dan Standar M' 192.58 0.020 95.25 97.33 192.58 49.46% 50.54% 100.00% 0.010 0.010 0.020
0.185 0.166 0.019 0.185
- Lantai IV (Elevasi ± 12)
1 Pemasangan 1 m2 Rangka Besi Hollow Modul 60x60 cm Plafond M² 1,075.65 0.354 1,053.20 22.45 1,075.65 97.91% 2.09% 100.00% 0.347 0.007 0.354
2 Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm M² 1,046.56 0.302 950.00 96.56 1,046.56 90.77% 9.23% 100.00% 0.274 0.028 0.302
3 Pemasangan 1 m2 Langit-langit Calsiboard (120x240x9) tebal 3,5 mm M² 29.08 0.008 29.08 0.00 29.08 99.98% 0.02% 100.00% 0.008 0.000 0.008
4 Pemasangan 1 m’ list langit-langit Gypsum kecil dan Standar M' 471.14 0.049 376.91 94.23 471.14 80.00% 20.00% 100.00% 0.039 0.010 0.049
0.713 0.668 0.045 0.713
TOTAL : I.D. PEKERJAAN PLAFOND 0.898 0.835 0.064 0.898
E. PEKERJAAN FINISHING
- Lantai Basement (Elevasi ± 0.00)
1 Pengecatan dinding dalam M² 530.24 0.102 42.10 488.14 530.24 7.94% 92.06% 100.00% 0.008 0.094 0.102
2 Pengecatan dinding luar M² 38.78 0.009 38.78 38.78 0.00% 100.00% 100.00% - 0.009 0.009
3 Pengecatan 1 m2 Plafond M² 268.02 0.051 268.02 268.02 0.00% 100.00% 100.00% - 0.051 0.051
0.162 0.008 0.154 0.162
- Lantai I (Elevasi ± 0.00)
1 Pengecatan ulang dinding lama (luar) M² 449.00 0.086 134.70 314.30 449.00 30.00% 70.00% 100.00% 0.026 0.060 0.086
0.086 0.026 0.060 0.086

action plan-02 Progress Perkuliahan 8 of 18


BOBOT VOLUME PROSENTASE PEKERJAAN BOBOT PEKERJAAN
NO URAIAN PEKERJAAN SAT. VOLUME
SD M- SD M- SD M-
% SD M-38 TOTAL SD M-38 TOTAL SD M-38 TOTAL
31 31 31
1 2 3 4 7 8 9 10.000
- Lantai II (Elevasi ± 4.00)
1 Pengecatan dinding dalam ( Basement) M² 256.00 0.049 128.00 128.00 256.00 50.00% 50.00% 100.00% 0.025 0.025 0.049
2 Pengecatan dinding luar M² 751.54 0.181 225.46 526.08 751.54 30.00% 70.00% 100.00% 0.054 0.127 0.181
0.230 0.079 0.151 0.230
- Lantai III (Elevasi ± 8.00)
1 Pengecatan dinding dalam M² 2,063.60 0.395 1,031.80 1,031.80 2,063.60 50.00% 50.00% 100.00% 0.198 0.198 0.395
2 Pengecatan dinding luar M² 751.54 0.181 225.46 526.08 751.54 30.00% 70.00% 100.00% 0.054 0.127 0.181
0.577 0.252 0.325 0.577
- Lantai IV (Elevasi ± 12)
1 Pengecatan dinding dalam M² 1,200.61 0.230 660.34 540.27 1,200.61 55.00% 45.00% 100.00% 0.127 0.104 0.230
2 Pengecatan dinding luar M² 737.16 0.178 221.15 516.01 737.16 30.00% 70.00% 100.00% 0.053 0.124 0.178
3 Pengecatan 1 m2 Plafond M² 999.80 0.192 599.88 399.92 999.80 60.00% 40.00% 100.00% 0.115 0.077 0.192
0.599 0.295 0.305 0.599
TOTAL : I.E. PEKERJAAN FINISHING 1.655 0.660 0.995 1.655
F. PEKERJAAN SANITAIR
- Lantai Basement (Elevasi ± 0.00)
Pasangan Keran Air bh 8.00 0.005 8.00 8.00 0.00% 100.00% 100.00% - 0.005 0.005
0.005 - 0.005 0.005
- Lantai I (Elevasi ± 0,00)
Railing Disabilitas (besi standlees Ø 2 " ) M' 9.00 0.056 9.00 9.00 0.00% 100.00% 100.00% - 0.056 0.056
0.056 - 0.056 0.056
- Lantai II (Elevasi + 4,00)
Railing Disabilitas (besi standlees Ø 2 " ) M' 9.00 0.056 9.00 9.00 0.00% 100.00% 100.00% - 0.056 0.056
0.056 - 0.056 0.056
- Lantai III (Elevasi + 8,00)
Railing Disabilitas (besi standlees Ø 2 " ) M' 9.00 0.056 9.00 9.00 0.00% 100.00% 100.00% - 0.056 0.056
0.056 - 0.056 0.056
- Lantai IV (Elevasi ± 12.00)
1 Pemasangan 1 buah closet duduk/monoblock Unit 2.00 0.031 2.00 2.00 0.00% 100.00% 100.00% - 0.031 0.031
2 Pemasangan 1 buah closet jongkok porslen Unit 2.00 0.004 2.00 2.00 0.00% 100.00% 100.00% - 0.004 0.004
3 Meja Wastrafel + Granit Unit 2.00 0.033 2.00 2.00 0.00% 100.00% 100.00% - 0.033 0.033
4 Pemasangan Wastafel Unit 2.00 0.016 2.00 2.00 0.00% 100.00% 100.00% - 0.016 0.016
5 Kaca Cermin + Gantungan Handuk Bh 2.00 0.008 2.00 2.00 0.00% 100.00% 100.00% - 0.008 0.008

action plan-02 Progress Perkuliahan 9 of 18


BOBOT VOLUME PROSENTASE PEKERJAAN BOBOT PEKERJAAN
NO URAIAN PEKERJAAN SAT. VOLUME
SD M- SD M- SD M-
% SD M-38 TOTAL SD M-38 TOTAL SD M-38 TOTAL
31 31 31
1 2 3 4 7 8 9 10.000
6 Pemasangan Kran air Jet washer + accessories Bh 2.00 0.002 2.00 2.00 0.00% 100.00% 100.00% - 0.002 0.002
7 Pemasangan 1 buah kran diameter ½” atau 3/4” Bh 4.00 0.002 4.00 4.00 0.00% 100.00% 100.00% - 0.002 0.002
8 Pemasangan 1 buah floor drain Bh 6.00 0.006 6.00 6.00 0.00% 100.00% 100.00% - 0.006 0.006
9 Pemasangan Kran Wastafel Bh 2.00 0.003 2.00 2.00 0.00% 100.00% 100.00% - 0.003 0.003
0.106 - 0.106 0.106
TOTAL : I.F. PEKERJAAN SANITAIR 0.278 - 0.278 0.278

G. PEKERJAAN ATAP KANOPI DAN BESI


- Lantai IV (Elevasi ± 12.00)
1 Pemasangan Pipa Galvanis Ф 2 INC & Ф 1,5 INC (Rangka Atap ,Tiang) Kg 2,165.95 0.301
2 Pekerjaan Besi Square Tube (Besi Kotak 4/4 dan 2/4) M² 38.72 0.080
3 Pemasangan 1 m2 Atap Onduline M² 180.18 0.223
4 Pemasangan Aluminium Foil dan Glasswool M² 499.96 0.124 499.96 499.96 100.00% 0.00% 100.00% 0.124 - 0.124
5 Pasanga Talang Air M' 39.00 0.024
6 Pasang Pipa PVC 4 " M' 57.00 0.023
7 Pek. Tangga Darurat Pipa Galvanis
- Pek. Tangga Darurat Pipa Galvanis Ф 2 INC & Ф 1,5 INC M' 10.00 0.082
- Plat Angkur 10 mm kg 3.36 0.001
- Baut dynabolt bh 12.00 0.000
- Besi Siku 70 x 70 x 7 mm kg 44.28 0.006
- Besi Plat Lantai t = 1,5 mm kg 19.70 0.003
- Pagar pengaman Besi Kotak 4/4 M² 5.00 0.010

TOTAL : I.G. PEKERJAAN ATAP KANOPI 0.878 0.124 - 0.124

H. PEKERJAAN HALAMAN
1 Pekerjaan Selasar Gedung
- Urungan Tanah M3 16.38 0.005 15.56 0.82 16.38 95.00% 5.00% 100.00% 0.005 0.000 0.005
- Urugan Pasir t = 5 cm M3 2.84 0.004 2.70 0.14 2.84 95.00% 5.00% 100.00% 0.003 0.000 0.004
- Pembesian Besi Polos Ø 10 kg 506.43 0.034 481.11 25.32 506.43 95.00% 5.00% 100.00% 0.033 0.002 0.034
- Cor Keliling Bangunan t=10 cm (fc' 12,2 Mpa) M3 5.69 0.031 5.40 0.28 5.69 95.00% 5.00% 100.00% 0.030 0.002 0.031
- Pasangan Keramik 30 x 30 cm Selasar Keliling Bangunan M² 56.88 0.072 56.88 56.88 0.00% 100.00% 100.00% - 0.072 0.072

action plan-02 Progress Perkuliahan 10 of 18


BOBOT VOLUME PROSENTASE PEKERJAAN BOBOT PEKERJAAN
NO URAIAN PEKERJAAN SAT. VOLUME
SD M- SD M- SD M-
% SD M-38 TOTAL SD M-38 TOTAL SD M-38 TOTAL
31 31 31
1 2 3 4 7 8 9 10.000

2 Pembuatan Saluran Gedung


- Galian Tanah M3 8.03 0.003 8.03 - 8.03 100.00% 0.00% 100.00% 0.003 - 0.003
- Pembesian Besi Polos Ø 10 kg 504.21 0.034 504.21 - 504.21 100.00% 0.00% 100.00% 0.034 - 0.034
- Begesting Saluran M² 66.30 0.062 66.30 - 66.30 100.00% 0.00% 100.00% 0.062 - 0.062
- Cor Saluran t =10 cm (fc' 12,2 Mpa) M3 4.34 0.024 4.34 - 4.34 100.00% 0.00% 100.00% 0.024 - 0.024
- Acian 1pc:2ps M² 51.00 0.008 - 51.00 51.00 0.00% 100.00% 100.00% - 0.008 0.008
- Pekerjaan Gril Besi M' 99.20 0.102 - 99.20 99.20 0.00% 100.00% 100.00% - 0.102 0.102

3 Pembuatan Halaman Parkir Kendaraan


- Perataan Tanah dan Penebangan Pohon (pembuangan) ls 1.00 0.103 1.00 - 1.00 100.00% 0.00% 100.00% 0.103 - 0.103
- Tanah Urug M3 74.75 0.094 37.38 37.38 74.75 50.00% 50.00% 100.00% 0.047 0.047 0.094
- Galian Tanah M3 37.80 0.012 12.99 24.81 37.80 34.37% 65.63% 100.00% 0.004 0.008 0.012
- Pancang Ulin 10/10 - 2 m titik 45.00 0.028 15.00 30.00 45.00 33.33% 66.67% 100.00% 0.009 0.019 0.028
- Pasangan Batu Gunung M3 59.40 0.251 14.85 44.55 59.40 25.00% 75.00% 100.00% 0.063 0.188 0.251
- Plesteran Batu Gunung M² 118.80 0.033 - 118.80 118.80 0.00% 100.00% 100.00% - 0.033 0.033
- Pembesian Besi Polos Ø 10 kg 4,857.43 0.329 1,217.65 3,639.78 4,857.43 25.07% 74.93% 100.00% 0.082 0.246 0.329
- Begesting halaman M² 54.24 0.051 13.60 40.64 54.24 25.07% 74.93% 100.00% 0.013 0.038 0.051
- Cor halaman t =15 cm M3 79.56 0.435 19.94 59.62 79.56 25.07% 74.93% 100.00% 0.109 0.326 0.435
- Pemasangan Kanstin 60 cm x 14 cm x 30 cm M' 63.00 0.052 63.00 63.00 0.00% 100.00% 100.00% - 0.052 0.052

TOTAL : I.H. PEKERJAAN HALAMAN 1.767 0.624 1.143 1.767

II. PEKERJAAN MEKANIKAL


A PEKERJAAN INSTALASI AIR BERSIH
Pengadaan dan pemasangan peralatan air bersih dan instalasi pipa air bersih
dalam gedung berikut fixtures, fittings, aksesoris, hanger & support
dan perlengkapannya beserta pengetesan sistem dan instalasi.
PEK. INSTALASI AIR BERSIH - LANTAI BASEMENT (Elev. ± 00.00)
Pipa PVC AW :
a. Pipa tegak PVC ø 3/4"(ke KM/WC) m 8.00 0.001 8.00 8.00 0.00% 100.00% 100.00% - 0.001 0.001
b. Pipa tegak PVC ø 1" mm (ke sumber air terdekat) m 10.00 0.001 10.00 10.00 0.00% 100.00% 100.00% - 0.001 0.001
Fitting & aksesoris pipa GSP medium class ls 1.00 0.000 1.00 1.00 0.00% 100.00% 100.00% - 0.000 0.000

action plan-02 Progress Perkuliahan 11 of 18


BOBOT VOLUME PROSENTASE PEKERJAAN BOBOT PEKERJAAN
NO URAIAN PEKERJAAN SAT. VOLUME
SD M- SD M- SD M-
% SD M-38 TOTAL SD M-38 TOTAL SD M-38 TOTAL
31 31 31
1 2 3 4 7 8 9 10.000

PEK. INSTALASI AIR BERSIH - LANTAI IV (Elev. ± 12.00)


Pipa PVC AW :
a. Pipa tegak PVC ø 3/4"(ke KM/WC) m 29.40 0.003 29.40 29.40 0.00% 100.00% 100.00% - 0.003 0.003
b. Pipa tegak PVC ø 1" mm (ke roof tank) m 19.20 0.002 19.20 19.20 0.00% 100.00% 100.00% - 0.002 0.002
Fitting & aksesoris pipa GSP medium class ls 1.00 0.001 1.00 1.00 0.00% 100.00% 100.00% - 0.001 0.001

PEK. INSTALASI AIR BERSIH - LANTAI ATAP DAK


Tangki Air lantai Dak
Pekerjaan instalasi tanki air (roof tank) :
Pipa PVC AW :
a. Pipa tegak PVC AW ø 3/4* (Rooftank) m 28.80 0.003 28.80 28.80 0.00% 100.00% 100.00% - 0.003 0.003
b. Pipa PVC AW ø 1,5" (ke lantai 1 & taman) m 59.26 0.010 59.26 59.26 0.00% 100.00% 100.00% - 0.010 0.010
c. Pipa PVC AW ø 2" (drain & overflow) m 3.00 0.001 3.00 3.00 0.00% 100.00% 100.00% - 0.001 0.001
d. Pipa PVC AW ø 1,5" (vent) m 3.00 0.000 3.00 3.00 0.00% 100.00% 100.00% - 0.000 0.000
Fitting & aksesoris pipa GSP medium class ls 1.00 0.002 1.00 1.00 0.00% 100.00% 100.00% - 0.002 0.002

TOTAL : II.A. PEKERJAAN INSTALASI AIR BERSIH 0.024 - 0.024 0.024

B PEK. INSTALASI AIR BUANGAN, AIR KOTOR & AIR HUJAN


Pengadaan dan pemasangan instalasi air bekas, air kotor, air hujan,
dan pipa ventilasinya dalam gedung berikut fixtures, fittings,
aksesoris, hanger & support dan perlengkapannya
beserta pengetesan sistem dan instalasi.
PEK. INSTALASI AIR BUANGAN LANTAI IV (Elev. ± 12.00)
Toilet Lantai - 4 ( Elev. ± 12.00)
Pekerjaan instalasi air bekas :
a. Pipa uPVC class AW : m 34.50 0.014 34.50 34.50 0.00% 100.00% 100.00% - 0.014 0.014
- Pipa uPVC class AW ø 50 mm ls 1.00 0.003 1.00 1.00 0.00% 100.00% 100.00% - 0.003 0.003
b. Fitting & aksesoris pipa uPVC class AW
c. Fixture unit :
- Floor clean out :
~ Floor clean out ø 100 mm pcs 4.00 0.004 4.00 4.00 0.00% 100.00% 100.00% - 0.004 0.004

action plan-02 Progress Perkuliahan 12 of 18


BOBOT VOLUME PROSENTASE PEKERJAAN BOBOT PEKERJAAN
NO URAIAN PEKERJAAN SAT. VOLUME
SD M- SD M- SD M-
% SD M-38 TOTAL SD M-38 TOTAL SD M-38 TOTAL
31 31 31
1 2 3 4 7 8 9 10.000
Pekerjaan instalasi air kotor :
a. Pipa uPVC class AW : m 32.00 0.013 32.00 32.00 0.00% 100.00% 100.00% - 0.013 0.013
- Pipa uPVC class AW ø 100 mm ls 1.00 0.003 1.00 1.00 0.00% 100.00% 100.00% - 0.003 0.003

TOTAL : II.B. PEKERJAAN INSTALASI AIR BUANGAN, AIR HUJAN DAN AIR KOTOR 0.037 - 0.037 0.037

C PEKERJAAN INSTALASI AIR CONDITIONING (AC)


Pengadaan dan pemasangan Air Conditioning (AC) lengkap dengan
kabel daya, refrigerant berisolasi, pipa drain (kondensat)
dan perlengkapannya beserta pengetesan sistem dan instalasi.
Instalasi Air Conditioning (AC)
a. Unit Air Conditioning (AC) : unit 23.00 0.663 23.00 23.00 100.00% 0.00% 100.00% 0.663 - 0.663
- Fan Coil Unit (FCU)
Tipe : wall mounted, single split system
Kapasitas : 9.000 BTUH (2.200 Kcal)
Servis : Ruang Sekretaris
Kode unit : FCU.1-0
Lokasi : lantai 3 & 4
- Condensing unit
Konsumsi daya : 825 W / 220 V / 1 Ph / 50 Hz
Kode unit : CU.1-0
Lokasi : outdoor lantai 1
b. Pipa refrigerant m 100.00 0.113 100.00 100.00 100.00% 0.00% 100.00% 0.113 - 0.113
c. Instalasi kabel daya : NYM 3 x 2,5 mm2 m 200.00 0.016 200.00 200.00 100.00% 0.00% 100.00% 0.016 - 0.016
d. Instalasi pipa drain/kondensat AC :
- Pipa drain/kondensat AC ø 20 mm m 50.00 0.008 50.00 50.00 100.00% 0.00% 100.00% 0.008 - 0.008
e. Fitting & aksesoris pipa drain/kondensat AC ls 1.00 0.012 1.00 1.00 100.00% 0.00% 100.00% 0.012 - 0.012
f. Testing & commissioning instalasi Air Conditioning (AC) ls 1.00 0.008

Instalasi Air Conditioning (AC) Portable Floor unit 6.00 1.853 5.00 5.00 83.33% 0.00% 83.33% 1.544 - 1.544
a. Unit Air Conditioning (AC) :
- Fan Coil Unit (FCU)
Tipe : wall mounted, single split system
Kapasitas : 55.000 BTUH

action plan-02 Progress Perkuliahan 13 of 18


BOBOT VOLUME PROSENTASE PEKERJAAN BOBOT PEKERJAAN
NO URAIAN PEKERJAAN SAT. VOLUME
SD M- SD M- SD M-
% SD M-38 TOTAL SD M-38 TOTAL SD M-38 TOTAL
31 31 31
1 2 3 4 7 8 9 10.000
Servis :
Kode unit : FCU.1-0
Lokasi : lantai 4
b. Pipa refrigerant m 100.00 0.113 50.00 50.00 50.00% 0.00% 50.00% 0.057 - 0.057
2
c. Instalasi kabel daya : NYM 3 x 2,5 mm m 145.00 0.012 145.00 145.00 100.00% 0.00% 100.00% 0.012 - 0.012
d. Instalasi pipa drain/kondensat AC :
- Pipa drain/kondensat AC ø 20 mm m 50.00 0.008 25.00 25.00 50.00% 0.00% 50.00% 0.004 - 0.004
e. Fitting & aksesoris pipa drain/kondensat AC ls 1.00 0.012
f. Testing & commissioning instalasi Air Conditioning (AC) ls 1.00 0.008
TOTAL : II.C. PEKERJAAN INSTALASI AIR CONDITIONING (AC) 2.829 2.431 - 2.431

D PEKERJAAN PEMADAM KEBAKARAN


Pekerjaan Fire Extinguisher : ( Lantai Basement Elev.-4.00)
a. Fire Extinguisher : unit 2.00 0.012 2.00 2.00 0.00% 100.00% 100.00% - 0.012 0.012
Agent : Carbon Dioxide (CO2)
Tipe : Portable
Kapasitas : 3 kg

Pekerjaan Fire Extinguisher : ( Lantai I Elev.± 0.00)


a. Fire Extinguisher : unit 5.00 0.031 5.00 5.00 0.00% 100.00% 100.00% - 0.031 0.031
Agent : Carbon Dioxide (CO2)
Tipe : Portable
Kapasitas : 3 kg

Pekerjaan Fire Extinguisher : ( Lantai II Elev.± 4.00)


a. Fire Extinguisher : unit 5.00 0.031 5.00 5.00 0.00% 100.00% 100.00% - 0.031 0.031
Agent : Carbon Dioxide (CO2)
Tipe : Portable
Kapasitas : 2 kg

action plan-02 Progress Perkuliahan 14 of 18


BOBOT VOLUME PROSENTASE PEKERJAAN BOBOT PEKERJAAN
NO URAIAN PEKERJAAN SAT. VOLUME
SD M- SD M- SD M-
% SD M-38 TOTAL SD M-38 TOTAL SD M-38 TOTAL
31 31 31
1 2 3 4 7 8 9 10.000
Pekerjaan Fire Extinguisher : ( Lantai III Elev.± 8.00)
a. Fire Extinguisher : unit 5.00 0.031 5.00 5.00 0.00% 100.00% 100.00% - 0.031 0.031
Agent : Carbon Dioxide (CO2)
Tipe : Portable
Kapasitas : 3 kg

Pekerjaan Fire Extinguisher : ( Lantai IV Elev.± 12.00)


a. Fire Extinguisher : unit 6.00 0.037 6.00 6.00 0.00% 100.00% 100.00% - 0.037 0.037
Agent : Carbon Dioxide (CO2)
Tipe : Portable
Kapasitas : 3 kg
TOTAL : II.D. PEKERJAAN PEMADAM KEBAKARAN 0.142 - 0.142 0.142

E. PEKERJAAN INSTALASI EXHAUST FAN


Pengadaan dan pemasangan Exhaust Fan lengkap dengan
kabel daya, dan perlengkapannya beserta pengetesan sistem dan
instalasi.
Instalasi exhaust fan 04
a. Unit exhaust fan : EFT-1.03A & 03B unit 4.00 0.041 4.00 4.00 0.00% 100.00% 100.00% - 0.041 0.041
Tipe : Propeller Wall Mounted
Kapasitas : 200 CMH
Static pressure : 5 Pa
Konsumsi daya : 55 W/ 220V/ 1 Ph / 50 Hz
Putaran : rpm
b. Instalasi kabel daya : NYM 3 x 2,5 mm2 m 8.00 0.001 8.00 - 8.00 100.00% 0.00% 100.00% 0.001 - 0.001
c. Test Commissioning ls 1.00 0.004
TOTAL : II.E. PEKERJAAN INSTALASI EXHAUST FAN 0.046 0.001 0.041 0.042

F. PEKERJAAN LIFT
1 Pengadaan lift unit 2.00 9.061 0.20 1.40 1.60 10.00% 70.00% 80.00% 0.906 6.343 7.249
Type : Lift Penumpang Type Standard

action plan-02 Progress Perkuliahan 15 of 18


BOBOT VOLUME PROSENTASE PEKERJAAN BOBOT PEKERJAAN
NO URAIAN PEKERJAAN SAT. VOLUME
SD M- SD M- SD M-
% SD M-38 TOTAL SD M-38 TOTAL SD M-38 TOTAL
31 31 31
1 2 3 4 7 8 9 10.000
Fungsi : Passenger
Kapasitas : 680 kg
Kecepatan : 60 mpm
Penggerak Kontrol : AC - VVF (Variable Voltage, Variable Freq)
Lantai yang dilayani : sesuai gambar
Tipe Pintu : Centre Opening
Sumber tenaga : AC 7,5 Kw, 3 phase, 220/380V, 50 Hz
Sumber penerangan : : AC 1 Phase 220 v
Aplication Code : BS, ANSI code A17.1, JIS
Matrials & Wiring : BS, ANSI code A17.1, JIS

2 Pekerjaan Pendukung
separator beam IWF 150 ( berat per M minimal 20 kg ) kg 2,880.00 0.401 2,880.00 2,880.00 0.00% 100.00% 100.00% - 0.401 0.401
kolom H Beam dudukan rel hoist way H Beam 100 ( per M min 14 Kg) kg 2,016.00 0.280 2,016.00 2,016.00 0.00% 100.00% 100.00% - 0.280 0.280
Struktur besi untuk pintu Siku 60.60.4 kg 627.20 0.087 627.20 627.20 0.00% 100.00% 100.00% - 0.087 0.087
Pasang AC 1/2 PK smart inverter panasonic Low Wattage unit 2.00 0.058
3 Test commissioning ls 1.00 0.062
TOTAL : II.F. PEKERJAAN LIFT 9.949 0.906 7.111 8.017

III. PEKERJAAN ELEKTRIKAL


A. PEKERJAAN LANTAI BASEMENT (Elevasi - 4.00)
1 Kabel Feeder
- dari PSD ke P-2, NYY 4x6 mm2 m 12.00 0.002
2 Pencahayaan
- Lampu RM 300 Led 2 x 18 Wat Mirror Louvre bh 27.00 0.095 - 27.00 27.00 0.00% 100.00% 100.00% - 0.095 0.095
- Saklar Tunggal 10A 250 VAC bh 4.00 0.001 4.00 4.00 0.00% 100.00% 100.00% - 0.001 0.001
- Saklar Ganda 10A 250 VAC bh 3.00 0.001 3.00 3.00 0.00% 100.00% 100.00% - 0.001 0.001
- Instalasi penerangan kabel dalam pipa konducit uPVC titik 27.00 0.033 27.00 - 27.00 100.00% 0.00% 100.00% 0.033 - 0.033

action plan-02 Progress Perkuliahan 16 of 18


BOBOT VOLUME PROSENTASE PEKERJAAN BOBOT PEKERJAAN
NO URAIAN PEKERJAAN SAT. VOLUME
SD M- SD M- SD M-
% SD M-38 TOTAL SD M-38 TOTAL SD M-38 TOTAL
31 31 31
1 2 3 4 7 8 9 10.000
3 Kotak Kontak
- Kotak Kontak Biasa 1 Fasa 15 A, 250 VAC bh 14.00 0.012 14.00 14.00 0.00% 100.00% 100.00% - 0.012 0.012
- Kotak Kontak Ceiling 1 Fasa 16 A, 250 VAC bh 7.00 0.006 7.00 7.00 0.00% 100.00% 100.00% - 0.006 0.006
- Instalasi Penerangan Kabel Dalam Pipa Konduit uPVC titik 21.00 0.026 18.00 3.00 21.00 85.71% 14.29% 100.00% 0.022 0.004 0.026
4 Test commissioning lantai Basement (Elevasi - 4.00) ls 1.00 0.004
TOTAL : III.A. PEKERJAAN LANTAI BASEMENT (Elevasi - 4.00) 0.180 0.056 0.117 0.173

B. PEKERJAAN LANTAI - 2 (Elevasi ± 4.00)


Pencahayaan
- Lampu RM 300 Led 2 x 18 Wat Mirror Louvre bh 11.00 0.039 11.00 11.00 0.00% 100.00% 100.00% - 0.039 0.039
TOTAL : III.B. PEKERJAAN LANTAI - 2 (Elevasi ± 4.00) 0.039 - 0.039 0.039

C. PEKERJAAN LANTAI - 3 (Elevasi ± 8.00)


Panel Hubung Bagi
- Panel AC Unit 1.00 0.082 1.00 1.00 0.00% 100.00% 100.00% - 0.082 0.082
Pencahayaan
- Lampu RM 300 Led 2 x 36 Wat Mirror Louvre bh 48.00 0.168 48.00 48.00 0.00% 100.00% 100.00% - 0.168 0.168
- Lampu RM 300 Led 2 x 18 Wat Mirror Louvre bh 43.00 0.151 43.00 43.00 0.00% 100.00% 100.00% - 0.151 0.151
- Lampu Down Light RD. 150 PLC Led 13 Watt bh 19.00 0.018 19.00 19.00 0.00% 100.00% 100.00% - 0.018 0.018
Test commisioning lantai Basement (Elevasi - 4.00) ls 1.00 0.004
TOTAL : III.C. PEKERJAAN LANTAI - 3 (Elevasi ± 8.00) 0.423 - 0.419 0.419

D. PEKERJAAN LANTAI - 4 (Elevasi ± 12.00)


1 Kabel Feeder
- dari PSD ke P-2, NYY 4x6 mm2 m 12.00 0.002 12.00 12.00 0.00% 100.00% 100.00% - 0.002 0.002
2 Panel Hubung Bagi
;- Panel P-4 unit 1.00 0.082 1.00 1.00 0.00% 100.00% 100.00% - 0.082 0.082
- Panel AC unit 1.00 0.082 1.00 1.00 0.00% 100.00% 100.00% - 0.082 0.082
- Panel Lift unit 2.00 0.165 2.00 2.00 0.00% 100.00% 100.00% - 0.165 0.165
3 Pencahayaan
- Lampu RM 300 Led 2 x 18 Wat Mirror Louvere bh 52.00 0.182 52.00 52.00 0.00% 100.00% 100.00% - 0.182 0.182
- Lampu Down Light RD 150 PLC Led 13 Wat bh 36.00 0.033 36.00 36.00 0.00% 100.00% 100.00% - 0.033 0.033

action plan-02 Progress Perkuliahan 17 of 18


BOBOT VOLUME PROSENTASE PEKERJAAN BOBOT PEKERJAAN
NO URAIAN PEKERJAAN SAT. VOLUME
SD M- SD M- SD M-
% SD M-38 TOTAL SD M-38 TOTAL SD M-38 TOTAL
31 31 31
1 2 3 4 7 8 9 10.000
- Saklar Tunggal 10A 250 VAC bh 12.00 0.003 12.00 12.00 0.00% 100.00% 100.00% - 0.003 0.003
- Saklar Ganda 10A 250 VAC bh 17.00 0.005 17.00 17.00 0.00% 100.00% 100.00% - 0.005 0.005
- Instalasi penerangan kabel dalam pipa konducit uPVC titik 88.00 0.109 88.00 - 88.00 100.00% 0.00% 100.00% 0.109 - 0.109
4 Kotak Kontak
- Kotak Kontak Biasa 1 Fasa 15 A, 250 VAC bh 10.00 0.008 10.00 10.00 0.00% 100.00% 100.00% - 0.008 0.008
- Kotak Kontak Ceiling1 Fasa 15 A, 250 VAC bh 4.00 0.003 4.00 4.00 0.00% 100.00% 100.00% - 0.003 0.003
- Instalasi Penerangan Kabel Dalam Pipa Kondui uPVC titik 14.00 0.017 14.00 - 14.00 100.00% 0.00% 100.00% 0.017 - 0.017
5 Instalasi untuk LCD Projector
- Tiang Penggantung LCD Otomatis unit 5.00 0.031
- Instalasi Daya 2 x 2.5 mm ttk 1.00 0.001
- Kotak Kontak 1 Fasa 15 A 250 VAC bh 1.00 0.001
- Instalasi Penerangan Kabel Dalam Pipa Konduit uPVC ttk 5.00 0.006 5.00 5.00 100.00% 0.00% 100.00% 0.006 - 0.006
- Kabel Data HDMI m 80.00 0.494
- Outlet Data bh 1.00 0.001
6 Test commisioning lantai - 2 ls 1.00 0.004
TOTAL : III.D. PEKERJAAN LANTAI - 4 (Elevasi ± 12.00) 1.231 0.132 0.567 0.699

action plan-02 Progress Perkuliahan 18 of 18


IV. LINGKUP PEKERJAAN :K3

BOBOT VOLUME PROSENTASE PEKERJAAN BOBOT PEKERJAAN


NO ITEM PEKERJAAN UNIT VOLUME
% SD M-31 SD M-38 TOTAL SD M- SD M-38 TOTAL SD M- SD M-38 TOTAL
31 31
1 2 3 4 6 7 8 9
I PEKERJAAN PENDAHULUAN
1 Penyiapan RK3K Terdiri atas
a Pembuatan manual prosedur, instruksi kerja
dan izin kerja ` Set 1.00 0.033 1.00 1.00 100.00% 0.00% 100.00% 0.033 - 0.033
b Pembuatan Kartu Identitas Pekerja (KIP) Org 30.00 0.001 30.00 30.00 100.00% 0.00% 100.00% 0.0012 - 0.001
2 Sosialisasidan Promosi K3 terdiri atas :
a Spanduk (banner) Lb 1.00 0.004 1.00 1.00 100.00% 0.00% 100.00% 0.004 - 0.004
b Poster Lb 1.00 0.003 1.00 1.00 100.00% 0.00% 100.00% 0.003 - 0.003
c Papan Informasi K3 Bh 1.00 0.006 1.00 1.00 100.00% 0.00% 100.00% 0.006 - 0.006
3 Alat Pelindung Kerja terdiri atas :
a Jaring Pengaman + Pemasangan Ls 1.00 0.206 1.00 1.00 100.00% 0.00% 100.00% 0.206 - 0.206
b Tali Keselamatan (lifeline) + Acesories Ls 1.00 0.062 1.00 1.00 100.00% 0.00% 100.00% 0.062 - 0.062
c Pagar Pengaman (guard railing) Ls 1.00 0.268 1.00 1.00 100.00% 0.00% 100.00% 0.268 - 0.268
d Pembatas Area Ls 1.00 0.021 1.00 1.00 100.00% 0.00% 100.00% 0.021 - 0.021
4 Alat Pelindung Diri terdiri atas :
a Topi Perlindungan Bh 30.00 0.012 30.00 30.00 100.00% 0.00% 100.00% 0.012 - 0.012
b Pelindung Mata Psg 30.00 0.006 30.00 30.00 100.00% 0.00% 100.00% 0.006 - 0.006
c Pelindung Pernapasan dan Mulut (Masker) Psg 30.00 0.004 30.00 30.00 100.00% 0.00% 100.00% 0.004 - 0.004
d Sarung Tangan (Kulit, Katun dan Karet) Psg 30.00 0.003 30.00 30.00 100.00% 0.00% 100.00% 0.003 - 0.003
e Sepatu Keselamatan Psg 30.00 0.062 30.00 30.00 100.00% 0.00% 100.00% 0.062 - 0.062
f Rompi Keselamatan (Safety Vest) Psg 30.00 0.003 30.00 30.00 100.00% 0.00% 100.00% 0.003 - 0.003
5 Asuransi dan Perijinan terdiri atas :
a BPJS Ketenagakerjaan dan Kesehatan Kerja
(Berdasarkan Kepmenaker No. Kep. 196/MEN/
1999, untuk Tenaga harian proyek) Ls 0.65 0.053 0.65 0.65 100.00% 0.00% 100.00% 0.053 - 0.053
6 Personil K3 terdiri atas :
a Ahli K3 OB 3.00 0.124 2.31 - 2.31 77.14% 0.00% 77.14% 0.095 - 0.095
c Petugas P3K OB 3.00 0.093 2.31 - 2.31 77.14% 0.00% 77.14% 0.071 - 0.071
7 Pasilitas sarana Kesehatan
a Peralatan P3K (Kotak P3K , Tandu, Tabung Ls 1.00 0.021 1.00 1.00 100.00% 0.00% 100.00% 0.021 - 0.021
Oksigen, Obat Luka, Perban dll.
8 Rambu - Rambu terdiri atas :
a Rambu Petunjuk Bh 2.00 0.002 2.00 2.00 100.00% 0.00% 100.00% 0.0021 - 0.002
b RambuLarangan Bh 2.00 0.002 2.00 2.00 100.00% 0.00% 100.00% 0.0021 - 0.002

action plant-02 Progress K3 Perkuliahan 1 of 2


BOBOT VOLUME PROSENTASE PEKERJAAN BOBOT PEKERJAAN
NO ITEM PEKERJAAN UNIT VOLUME
% SD M-31 SD M-38 TOTAL SD M- SD M-38 TOTAL SD M- SD M-38 TOTAL
31 31
1 2 3 4 6 7 8 9
c Rambu Peringatan Bh 2.00 0.002 2.00 2.00 100.00% 0.00% 100.00% 0.0021 - 0.002
d Rambu Kewajiban Bh 2.00 0.002 2.00 2.00 100.00% 0.00% 100.00% 0.0021 - 0.002
e Rambu Informasi Bh 2.00 0.002 2.00 2.00 100.00% 0.00% 100.00% 0.0021 - 0.002
9 Lain -Lain Terkait Pengendalian ResikoK3
a Alat Pemadam Api Ringan (APAR); 3,3 kg Bh 1 0.006 1.00 1.00 100.00% 0.00% 100.00% 0.006 - 0.006
b Bendera K3 Bh 1 0.004 1.00 1.00 100.00% 0.00% 100.00% 0.004 - 0.004
10 Peralatan Penunjang Protokol Pencegahan COVID-19
a Alat Pengukur Suhu Badan (Termoscan) bh 1 0.010 1.00 1.00 100.00% 0.00% 100.00% 0.010 - 0.010
b Alat Semprot Disinfektan dan Obat Disinfektan set 1 0.001 1.00 1.00 100.00% 0.00% 100.00% 0.001 - 0.001
c Masker Wajah Untuk Pekerja, Staff dan Direksi bh 100 0.006 100.00 100.00 100.00% 0.00% 100.00% 0.006 - 0.006
d Tempat Cuci Tangan dan Sabun Antiseptik set 1 0.001 1.00 1.00 100.00% 0.00% 100.00% 0.001 - 0.001
e Hand Sanitizer bh 1 0.001 1.00 1.00 100.00% 0.00% 100.00% 0.001 - 0.001
f Obat-Obatan dan Vitamin ls 1 0.003 1.00 1.00 100.00% 0.00% 100.00% 0.003 - 0.003
g Oxygen Tub tub 1 0.001 1.00 1.00 100.00% 0.00% 100.00% 0.001 - 0.001
h Rambu-Rambu Sosialisasi Pencegahan COVID-19 ls 1 0.003 1.00 1.00 100.00% 0.00% 100.00% 0.003 - 0.003

TOTAL 1.031 0.982 - 0.982

action plant-02 Progress K3 Perkuliahan 2 of 2


Proyek Pembangunan Gedung Kuliah Terpadu, Workshop Terpadu Politeknik Negeri Balikpapan
PT. Kharisma Menara Abadi

ACTION PLAN - Periode Juli s/d Agustus 2020 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47

Bobot % Bulan JULI Bulan AGUSTUS


NO URAIAN PEKERJAAN Realisasi Renc. Bobot MINGGU-32 MINGGU-33 MINGGU-34 MINGGU-35 MINGGU-36 MINGGU-37 MINGGU-38 KETERANGAN
Cco-02 Sisa Bobot
s/d M-31 s/d M-38 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2

I GEDUNG WORKSHOP TERPADU


PEKERJAAN PENDAHULUAN 0.423 0.423 - -

BANGUNAN WORKSHOP TERPADU


I PEKERJAAN KAP/ATAP 23.214 17.229 5.98 5.688 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12
Pek Angkur 4 M. 19 (P = 300)
Pek. Base Plat 400 x 400 x 12 mm
Pek Grouting
Pipa Baja (pipa dia. 3",10",12") - Posisi Kolom KD1

- RL. 1 (Elevasi + 7.140) (Kuda-kuda Lengkung)


Pek Angkur 6 M. 22 (P = 400)
Pek Base Plat 450 x 450 x 20 mm
Pek Angkur 4 M. 19 (P = 300)
Pek. Base Plat 400 x 400 x 12 mm
Pek Grouting
Pipa Baja (pipa dia.2",3",4",10") - Posisi Kuda-Kuda KD1 s/d KD8
Lipped Chanel CNP 125x50x20x3,2mm - Posisi Gording / Purlin Rangka Atap Sisi Atas
Lipped Chanel CNP 150x65x20x3,2mm - Posisi Gording / Purlin Rangka Atap 3 Sisi Bawah

Accessories
Trekstang Besi dia. 12mm Polos, BJTP U24 - Posisi Ikatan Antar Gording / Purlin
Ikatan Angin dia. 16mm Polos, BJTP U24 - Posisi Ikatan Angin Kuda-Kuda
Plat (tebal 6,8,10,12 mm) koneksi gording/purlin dan bracing
Jarum Keras dia. 16mm - Ikatan Angin Kuda-Kuda KD1 s/d KD8

II PEKERJAAN PASANGAN / PARTISI 4.670 3.842 0.829 -


Pemasangan dinding bata ringan tebal 7,5 cm
Pemasangan dinding terawang (rooster) campuran 1PC:4PP
Pemasangan Acian
Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi
Dinding partisi ( Calsiboard + Finishing Cat) : untuk ruang kuliah dalam
Pembuatan 1 m1 kolom - balok praktis beton bertulang (11x11)
Pemasangan Plesteran Dinding
Pek. Perapihan Exposed beton (Balok Dan Kolom)

III PEKERJAAN PLAFOND / RAILLING 1.484 0.008 1.476 -


Pekerjaan Lantai - 1
Pas. Rangka hollow 40/40, Plafond Gypsum 9mm dan Cornice
List Plafond Profil U

Pekerjaan Lantai - 2
Pas. Rangka hollow 40/40, Plafond Gypsum 9mm dan Cornice
List Plafond Profil U
Railling Tangga + Void Stainless Steel

IV PEKERJAAN KERAMIK 3.980 1.981 2.000 -


- LANTAI SATU DAN DUA
Pemasangan (lantai keramik 40x40,60x60 dan dinding 20x25)
Pemasangan 1 m2 floor harderner

V PEKERJAAN PENGECATAN 0.644 0.200 0.443 -


LANTAI 1 dan 2
Pengecatan dinding (dalam,luar dan plafond)

VI PEKERJAAN SANITASI + INSTALASI AIR 2.013 - 2.013 1.456 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04

VII PEKERJAAN KUSEN / PINTU / JENDELA 3.054 0.657 2.397 1.350 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
Kusen Alumunium
Pintu Type (P1,P2,P3,P4,PD1,PD1A,PD2,PD3,PD4)
Jendela Type (J1,V1,Bovent)
Louvre Aluminium Type L1 (uk 135 x 190 cm) 64 unit
Louvre Aluminium Type L2 (uk 195 x 50 cm) 40 unit

VIII PEKERJAAN PENGGANTUNG / PENGUNCI 0.369 - 0.369 -


IX PEKERJAAN ATAP 22.161 12.342 9.819 2.154 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05
X PEKERJAAN TERAS DEPAN , PARIT KELILING BANGUNAN 2.044 - 2.044 -
XI PEKERJAAN HALAMAN PARKIR 3.926 - 3.926 -
XII PEKERJAAN INSTALASI LISTRIK LANTAI SATU 1.324 0.064 1.259 0.860 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
XIII PANEL SDP I 0.680 - 0.680 0.443 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
XIV PEKERJAAN FIRE ALARM 0.633 - 0.633 -
XV PEKERJAAN PENANGKAL PETIR TERMASUK BIAYA PERIJINAN 0.209 - 0.209 -
XVI KESELAMATAN DAN KESEHATAN KERJA ( K3 ) 1.034 0.985 0.049 -
Jumlah Bobot % 71.860 37.729 34.130 11.951

I GEDUNG KULIAH TERPADU


I PEKERJAAN ARSITEKTUR
A PEKERJAAN PASANGAN DINDING 0.819 0.586 0.232 0.193 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
- Lantai Basement (Elevasi - 4.00)
- Lantai I (Elevasi ± 0.00)
- Lantai II (Elevasi ± 4.00)
- Lantai III (Elevasi ± 8.00)
- Lantai IV (Elevasi ± 12.00)

B PEKERJAAN LANTAI 3.516 2.652 0.863 0.863 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
- Lantai Basement (Elevasi - 4.00)
- Lantai I (Elevasi ± 0.00)
- Lantai II (Elevasi ± 4.00)
- Lantai III (Elevasi ± 8.00)
D:\Data Proyek\poltekba\Action Plan sd Minggu
- Lantai IV (Elevasi 38\action plant-juli agst
± 12.00)
Bobot % Bulan JULI Bulan AGUSTUS
NO URAIAN PEKERJAAN Realisasi Renc. Bobot MINGGU-32 MINGGU-33 MINGGU-34 MINGGU-35 MINGGU-36 MINGGU-37 MINGGU-38 KETERANGAN
Cco-02 Sisa Bobot
s/d M-31 s/d M-38 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2

C PEKERJAAN PINTU/JENDELA 2.399 1.982 0.417 0.353 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
- Lantai Basement (Elevasi - 4.00)
- Lantai I (Elevasi ± 0.00)
- Lantai II (Elevasi ± 4.00)
- Lantai III (Elevasi ± 8.00)
- Lantai IV (Elevasi ± 12.00)

D PEKERJAAN PLAFOND 0.898 0.835 0.064 0.064 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
- Lantai Basement (Elevasi - 4.00)
- Lantai IV (Elevasi ± 12.00)

E PEKERJAAN FINISHING 1.655 0.660 0.995 0.995 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04
- Cat dinding Lantai Basement (Elevasi - 4.00)
- Cat dinding Lantai I (Elevasi ± 0.00)
- Cat dinding Lantai II (Elevasi ± 4.00)
- Cat dinding Lantai III (Elevasi ± 8.00)
- Cat dinding Lantai IV (Elevasi ± 12.00)

F PEKERJAAN SANITAIR 0.278 - 0.278 0.278 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
G PEKERJAAN ATAP CANOPY 0.878 0.124 0.754 -
H PEKERJAAN HALAMAN 1.767 0.624 1.143 1.143 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04
II PEKERJAAN MEKANIKAL 13.027 3.337 9.690 7.356 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16
III PEKERJAAN ELEKTRIKAL 1.872 0.188 1.684 1.141 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07
IV KESELAMATAN DAN KESEHATAN KERJA ( K3 ) 1.031 0.982 0.049 -
28.140 11.969 16.171 12.387 0.631 0.631 0.631 0.631 0.631 0.631 0.631 0.631 0.631 0.631 0.631 0.631 0.631 0.631 0.631 0.631 0.631 0.564 0.564 0.564 0.595 0.595 0.595 0.595 0.595 0.595 0.595 0.451 0.451 0.451 0.451 0.451 0.451 0.451 0.420 0.378 0.378 0.378 0.378 0.378 0.344 0.323 0.323 0.323 0.323 0.323 0.323
Jumlah bobot % 100.000 49.698 50.301 24.337 4.416 4.416 3.584 4.168 3.159 2.654 1.940

Jumlah komulatif % (sd M-38) 74.036 54.114 58.530 62.114 66.282 69.441 72.095 74.036

M-32 M-33 M-34 M-35 M-36 M-37 M-38 Balikpapan, 20 Juli 2020
KETERANGAN : RENCANA SCHEDULE 49.315 51.373 55.457 60.003 64.381 88.616 73.271 PT. Kharisma Menara Abadi
RENCANA ACTION PLANT 54.114 58.530 62.114 66.282 69.441 72.095 74.036 Dibuat :

A. Wididarno,ST
Ops. Manager

D:\Data Proyek\poltekba\Action Plan sd Minggu 38\action plant-juli agst