SPK PEKERJAAN BAJA - TALANG WORKSHOP EXISTING

PEMBANGUNAN WORKSHOP KTC - PALARAN


Total Harga Deviasi Harga
Volume Total Harga
Volume Deviasi Harga Satuan Satuan Gambar (SPK - Gambar
No Item Pekerjaan Satuan Gambar Satuan Satuan Satuan SPK Keterangan
SPK Volume Baru Baru)
Baru
(Rp) (Rp) (Rp) (Rp)

PEKERJAAN STRUKTUR BAJA DAN ATAP


1 Roof Gutter PVC 12" 50.00 m1 - m1 (50.00) m1 215,000.00 10,750,000.00 - (10,750,000.00) c/w Accessories
2 Rain Water Down Pipe, 12" dia 32.00 m1 - m1 (32.00) m1 215,000.00 6,880,000.00 - (6,880,000.00) c/w Accessories

TALANG AIR MENGGUNAKAN MATERIAL PLAT 1,2mm


1 Plat Galvanish tebal 1,2mm, Uk. 122x244cm - kg 630.00 kg 630.00 kg 19,000.00 - 11,970,000.00 11,970,000.00
2 Rangka Cremona Hollow 50xx50x3mm - kg 1,476.30 kg 1,476.30 kg 19,000.00 - 28,049,700.00 28,049,700.00
3 Pipa dia. 6Inchi, Pembuangan Dari Talang ke Tanah - m 30.00 m 30.00 m 215,000.00 - 6,450,000.00 6,450,000.00

TOTAL HARGA 17,630,000.00 46,469,700.00 28,839,700.00


DIBULATKAN 17,630,000.00 46,469,000.00 28,839,000.00

Terbilang :
# DUA PULUH DELAPAN JUTA DELAPAN RATUS TIGA PULUH SEMBILAN RIBU RUPIAH #