IV PEKERJAAN LAIN-LAIN
D PEKERJAAN SANITASI
1 GEDUNG A
I PEKERJAAN PANEL - PANEL & PERLENGKAPANNYA
LANTAI 1
1 Main Distribution Panel ( MDP ) unit 1.00 1.00
2 Panel Pompa Transfer unit 1.00 1.00
3 Sub Distribution Panel Lantai 1 (SDP LT.1) unit 1.00 1.00
4 Pan. Pen & SK lantai 1 unit 1.00 1.00
5 Panel Power AC lantai 1 unit 1.00 1.00
perubahan progres ket
NO JENIS PEKERJAAN SAT VOLUME 31 agustus
LANTAI 2
1 Sub Distribution Panel Lantai 1 (SDP LT.2) unit 1.00 1.00
2 Pan. Pen & SK lantai 2 unit 1.00 1.00
3 Panel Power AC lantai 2 unit 1.00 1.00
TOTAL PEKERJAAN PANEL-PANEL:
V PEKERJAAN PLUMBING
Pekerjaan Pompa - Pompa dan Perlengkapannya
1 Pompa tranfer (GWT ke rooftank) unit 1.00
2 Pipa GIP Medium Ø 2" m' 5.00
3 Strainer Ø 50mm (2") bh 1.00
4 Flexsible joint Ø 50mm (2") bh 2.00
5 Check valve Ø 50mm (2") bh 1.00
6 Gate valve Ø 50mm (2") bh 2.00
7 Foot valve Ø 50mm (2") bh 1.00
8 Preasure gauge + ball valve bh 1.00
9 Suppot, fitting, hanger, cat dll. ls 1.00
Pekerjaan Instalasi Rooftank
1 Roof tank kap. 1000 liter bh 2.00
2 Pipa PVC AW Ø 2" (pipa kuras dan over flow rooftank) m' 10.00 1 inch
3 Pipa PVC AW Ø 2" (pipa distribusi) m' 10.00 90.00 68.00 1 inch
4 Gate valve Ø 50mm (2") bh 2.00 4.00 1 inch
LANTAI 1
Instalasi perpipaan distribusi air bersih
perubahan progres ket
NO JENIS PEKERJAAN SAT VOLUME 31 agustus
3 Kabel dari MDF ke TSB-SB, NYHMY 3(3x2.5 mm2) m' 10.00 70.00
4 Ceiling Speaker 3 watt bh 11.00 11.00
5 Titik Instalasi Speaker, NYMHY 3x1,5 mm2 dalam conduit titik 11.00 nymhy 2 x 2.5mm
TOTAL PEKERJAAN TATA SUARA:
TOTAL PEKERJAAN MEP GEDUNG A:
2 GEDUNG B
I PEKERJAAN PANEL - PANEL & PERLENGKAPANNYA
LANTAI 1
1 Sub Distribution Panel Lantai 1 (SDP LT.1) unit 1.00 1.00
2 Pan. Pen & SK lantai 1 unit 1.00 1.00
3 Panel Power AC lantai 1 unit 1.00 1.00
LANTAI 2
1 Sub Distribution Panel Lantai 1 (SDP LT.2) unit 1.00 1.00
2 Pan. Pen & SK lantai 2 unit 1.00 1.00
3 Panel Power AC lantai 2 unit 1.00 1.00 dipasang di auditorium smp
TOTAL PEKERJAAN PANEL-PANEL:
IV PEKERJAAN PLUMBING
Pekerjaan Instalasi Rooftank
1 Roof tank kap. 1000 liter bh 2.00
2 Pipa PVC AW Ø 2" (pipa kuras dan over flow rooftank) m' 10.00 1 inch
3 Pipa PVC AW Ø 2" (pipa distribusi) m' 10.00 35.00 35.00 1 inch
4 Gate valve Ø 50mm (2") bh 2.00 4.00 1 inch
LANTAI 1
Instalasi perpipaan distribusi air bersih
1 Pipa PVC AW Ø 2" (riser) m' 10.00 1 inch
2 Pipa PVC AW Ø 2" m' 20.00 8.00 1 inch
3 Pipa PVC AW Ø 3/4" m' 45.00 32.00
4 Pipa PVC AW Ø 1/2" m' 10.00 8.00
5 Gate valve Ø 50mm (2") bh 2.00
perubahan progres ket
NO JENIS PEKERJAAN SAT VOLUME 31 agustus
LANTAI 2
B PEKERJAAN STRUKTUR
IV PEKERJAAN LAIN-LAIN
PEKERJAAN GWT DAN BIOFILTER
1 Pek. Galian tanah m3 22.88
2 Pek. Urugan kembali m3 4.50
3 Pek. Urugan Pasir m3 1.53
4 Pek. Lantai kerja t = 5 cm m3 0.76
5 GWT kapasitas 4 m3 unit 1.00
6 Septi tank biotek kap. 3 m3 unit 2.00
7 Instalasi septictank biotek lengkap lot 2.00
SUBTOTAL PEKERJAAN LAIN-LAIN :
TOTAL PEKERJAAN STRUKTUR :
D PEKERJAAN SANITASI
1 GEDUNG 1
I PEKERJAAN PANEL - PANEL & PERLENGKAPANNYA
LANTAI 1
1 Main Distribution Panel ( MDP ) unit 1.00 1.00
progress
perubahan
NO JENIS PEKERJAAN SAT VOLUME
V PEKERJAAN PLUMBING
Pekerjaan Pompa - Pompa dan Perlengkapannya
1 Pompa tranfer (GWT ke rooftank) unit 1.00
2 Pipa GIP Medium Ø 2" m' 5.00
3 Strainer Ø 50mm (2") bh 1.00
4 Flexsible joint Ø 50mm (2") bh 2.00
5 Check valve Ø 50mm (2") bh 1.00
6 Gate valve Ø 50mm (2") bh 2.00
7 Foot valve Ø 50mm (2") bh 1.00
8 Preasure gauge + ball valve bh 1.00
progress
perubahan
NO JENIS PEKERJAAN SAT VOLUME
2 GEDUNG 2
I PEKERJAAN PENARIKAN & KONEKSI KABEL FEEDER
LANTAI 1
1 Dari MDP ke SDP LT.1 (NYY 4x6mm² + NYA 4mm²) m' 2.50
2 Dari MDP ke SDP LT.2 (NYY 4x6mm² + NYA 4mm²) m' 5.00
3 SDP LT. 1 ke Pan. Pen & SK (NYY 4x4mm² + NYA 2,5mm²) m' 2.50
4 SDP LT. 1 ke Panel AC (NYY 4x6mm² + NYA 4mm²) m' 2.50
LANTAI 2
1 SDP LT. 2 ke Pan. Pen & SK (NYY 4x4mm² + NYA 2,5mm²) m' 2.50
2 SDP LT. 2 ke Panel AC (NYY 4x6mm² + NYA 4mm²) m' 2.50
TOTAL PEKERJAAN PENARIKAN & KONEKSI KABEL FEEDER:
3 GEDUNG 3
I PEKERJAAN PENARIKAN & KONEKSI KABEL FEEDER
Audiotorium
progress
perubahan
NO JENIS PEKERJAAN SAT VOLUME
1 Dari MDP ke SDP Audiotorium (NYY 4x6mm² + NYA 4mm²) m' 41.50 85.00 85.00
2 SDP LT. 1 ke Pan. Pen & SK (NYY 4x4mm² + NYA 2,5mm²) m' 2.50
3 SDP LT. 1 ke Panel AC (NYY 4x6mm² + NYA 4mm²) m' 2.50
TOTAL PEKERJAAN PENARIKAN & KONEKSI KABEL FEEDER:
4 GEDUNG 4
I PEKERJAAN PENARIKAN & KONEKSI KABEL FEEDER
1 Dari MDP ke SDP Gedung 4 (NYY 4x6mm² + NYA 4mm²) m' 55.00
2 SDP LT. 1 ke Pan. Pen & SK (NYY 4x4mm² + NYA 2,5mm²) m' 2.50
3 SDP LT. 1 ke Panel AC (NYY 4x6mm² + NYA 4mm²) m' 2.50
TOTAL PEKERJAAN PENARIKAN & KONEKSI KABEL FEEDER:
3 Downlight 7W LED bh -
4 Saklar tunggal bh 1.00
5 Saklar ganda bh 8.00
6 Stop kontak bh 29.00 30.00 30.00
7 Celling Exhaust Fan bh -
8 Instalasi penerangan (NYM 3 x 2,5mm² dlm pipa conduit 20 Titik 43.00 55.00
9 Instalasi stop kontak (NYM 3 x 2,5mm² dlm pipa conduit 20 Titik 29.00 30.00
TOTAL PEKERJAAN PENERANGAN & STOP KONTAK:
ganti 1 inch
1 inch
1 inch
1 inch
1 inch
ganti 3 inch
3 inch
pipa 1 1/4 inch utk wastafel
13 titik x 4 meter
ganti 1 inch
1 inch
ganti 3 inch
3 inch
13 titik x 4 meter
hapus
hapus
hapus
hapus
hapus
hapus
hapus
hapus
hapus
1 inch
1 inch
keterangan
1 inch
1 inch
13 titik x 4 meter
13 titik x 4 meter
hapus
nymhy 2 x 2.5mm
hapus
nymhy 2 x 2.5mm
keterangan
ada
hapus
hapus
1 inch
1 inch
hapus
nymhy 2 x 2.5mm
hapus
hapus
hapus
keterangan
16 titik 3 inch
hapus
nymhy 2 x 2.5mm
BILL OF QUANTITY (BOQ)
PEKERJAAN : REVITALISASI KAWASAN ISLAMIC CENTER KOTA PALOPO
LOKASI : KOTA PALOPO - SULAWESI SELATAN
TAHUN ANGGARAN : ###
B PEKERJAAN STRUKTUR
IV PEKERJAAN LAIN-LAIN
PEKERJAAN GWT DAN BIOFILTER
1 Pek. Galian tanah m3 22.88
2 Pek. Urugan kembali m3 4.50
3 Pek. Urugan Pasir m3 1.53
4 Pek. Lantai kerja t = 5 cm m3 0.76
5 GWT kapasitas 4 m3 unit 1.00
6 Septi tank biotek kap. 3 m3 unit 2.00
7 Instalasi septictank biotek lengkap lot 2.00 80.00 rugi. panjang pipa mungkin 80 meter 4 inch dihitung 1 lo
SUBTOTAL PEKERJAAN LAIN-LAIN :
TOTAL PEKERJAAN STRUKTUR :
D PEKERJAAN SANITASI
V PEKERJAAN PLUMBING
Pekerjaan Pompa - Pompa dan Perlengkapannya
1 Pompa tranfer (GWT ke rooftank) unit 1.00
2 Pipa GIP Medium Ø 2" m' 5.00
3 Strainer Ø 50mm (2") bh 1.00
4 Flexsible joint Ø 50mm (2") bh 2.00
5 Check valve Ø 50mm (2") bh 1.00
6 Gate valve Ø 50mm (2") bh 2.00
7 Foot valve Ø 50mm (2") bh 1.00
8 Preasure gauge + ball valve bh 1.00
9 Suppot, fitting, hanger, cat dll. ls 1.00
Pekerjaan Instalasi Rooftank
1 Roof tank kap. 1000 liter bh 2.00
keterangan JUMLAH HARGA
NO JENIS PEKERJAAN SAT VOLUME Perubahan progress
(Rp.)
2 Pipa PVC AW Ø 2" (pipa kuras dan over m' 10.00
3 Pipa PVC AW Ø 2" (pipa distribusi) m' 10.00
4 Gate valve Ø 50mm (2") bh 2.00
LANTAI 1
Instalasi perpipaan distribusi air bersih
1 Pipa PVC AW Ø 2" (riser) m' 30.00 25.00 24.00 ganti 1 inch
2 Pipa PVC AW Ø 2" m' 60.00 163.50 120.00 1 inch
3 Pipa PVC AW Ø 3/4" m' 135.00 72.00 72.00
4 Pipa PVC AW Ø 1/2" m' 30.00 60.00 40.00
5 Gate valve Ø 50mm (2") bh 5.00 ganti 1 inch
6 Fitting, support, hanger,dll ls 1.00
Instalasi perpipaan distribusi air bekas
1 Pipa PVC AW Ø 4" (riser) m' 30.00 24.00 ganti 3 inch
2 Pipa PVC AW Ø 2,5" m' 59.00 48.00 ganti 3 inch
3 Pipa PVC AW Ø 2" m' 56.00 16.00 8.00
36.00 16.00 tambah pipa 1 1/4 inch
4 Fitting, support, hanger,dll ls 1.00
Instalasi perpipaan distribusi air kotor
1 Pipa PVC AW Ø 4" (riser) m' 30.00 24.00
2 Pipa PVC D Ø 2" (riser vent) m' 30.00 16.00
3 Pipa PVC AW Ø 4" m' 22.50 24.00
4 Pipa PVC D Ø 2" vent m' 6.00 6.00
5 Fitting, support, hanger,dll ls 1.00
Instalasi perpipaan distribusi air hujan
1 Pipa PVC AW Ø 4" (riser) m' 80.00 192.00 164.00 48 titik x 4 meter
LANTAI 2
Instalasi perpipaan distribusi air bersih
1 Pipa PVC AW Ø 2" (riser) m' 20.00 ganti 1 inch
2 Pipa PVC AW Ø 2" m' 41.00 24.00 1 inch
3 Pipa PVC AW Ø 3/4" m' 91.00 40.00
4 Pipa PVC AW Ø 1/2" m' 30.00 24.00
5 Gate valve Ø 50mm (2") bh 9.00 5.00 1 inch
6 Fitting, support, hanger,dll ls 1.00
Instalasi perpipaan distribusi air bekas
1 Pipa PVC AW Ø 4" (riser) m' 20.00 ganti 3 inch
2 Pipa PVC AW Ø 2,5" m' 44.00 32.00 ganti 3 inch
3 Pipa PVC AW Ø 2" m' 41.00 16.00
16.00 12.00 tambah pipa 1 1/4 inch
4 Fitting, support, hanger,dll ls 1.00
Instalasi perpipaan distribusi air kotor
1 Pipa PVC AW Ø 4" (riser) m' 20.00 20.00
2 Pipa PVC D Ø 2" (riser vent) m' 20.00 20.00
3 Pipa PVC AW Ø 4" m' 15.00 15.00
4 Pipa PVC D Ø 2" vent m' 4.00 4.00
5 Fitting, support, hanger,dll ls 1.00
Instalasi perpipaan distribusi air hujan
1 Pipa PVC AW Ø 4" (riser) m' 40.00 160.00 144.00 40 titik x 4 meter
TOTAL PEKERJAAN PLUMBING: