c Pekerjaan AC
1 AC unit 3/4 PK unit 1.00
2 AC unit 1,5 PK unit 2.00
SUB TOTAL
TOTAL I
II Pekerjaan Plumbing
1 Pekerjaan Air Bersih
Instalasi Pipa PVC AW lengkap dengan fiting:
PVC AW 1" m' 62.00
PVC AW 1/2" m' 70.00
Ball Valve 1" bh 3.00
IV Pekerjaan Kurang
a Pekerjaan Instalasi Penerangan
1 HPI -T 400W + Armatur MNF 210 bh 8.00
2 Armatur Industri + ESS 85W ( Armartur Aluminium ) bh 16.00
TOTAL IV
PEKERJAAN ELECTRICAL
b Pekerjaan Instalasi Penerangan, Stop Kontak & Power AC Lt.1 & 2
1 Instalasi titik lampu & exhausefan ttk 37.00
2 Instalasi titik stop kontak listrik ttk 15.00
3 Instalasi Power AC ttk 5.00
4 Instalasi titik stop kontak telphone ttk 1.00
5 Instalasi titik stop kontak TV ttk 6.00
6 Down Light RD 150 + ESS 14W bh 49.00
7 Down Light OB 5" + ESS 14W bh 2.00
8 Lampu Halogen 150W bh 3.00
9 Saklar Tunggal bh 11.00
10 Saklar Hotel bh 2.00
11 Saklar Serie bh 8.00
12 Stop Kontak Listrik bh 15.00
13 Stop Kontak Telphone bh 1.00
14 Stop Kontak TV bh 6.00
15 Stop Kontak AC bh 5.00
16 Box MCB LT.1 bh 1.00
17 Box MCB LT.2 bh 1.00
18 Instalasi grounding system ttk 1.00
19 Antena TV bh 2.00
20 Boster TV bh 2.00
21 Pipa GIV 1.1/4" btg 1.00
SUB TOTAL
AN BIAYA
& ELECTRIKAL
AL 2
INDA
HARGA JUMLAH
SATUAN HARGA KET
Rp Rp
26,092,000 26,092,000
427,932,249 427,932,249
1,767,600 1,767,600
540,000 540,000
JUMLAH 455,251,849
PPN 10% 45,525,185
GRAND TOTAL 500,777,034
HARGA JUMLAH
SATUAN HARGA KET
Rp Rp
110,500 5,525,000
110,500 5,525,000
32,305 807,625
9,100,000 9,100,000
1,755,000 1,755,000
750,000 750,000
500,000 500,000
23,962,625
4,500,000 4,500,000
7,500,000 15,000,000
19,500,000
214,828,637
HARGA JUMLAH
SATUAN HARGA KET
Rp Rp
11,050 685,100
7,750 542,500
180,000 540,000
26,430 1,057,200
22,500 450,000
11,050 221,000
31,850 1,911,000
26,430 4,545,960
31,850 764,400
7,750 193,750
8,125,000 8,125,000
19,035,910
400,000 3,200,000
45,760 2,288,000
41,792,220
1,416,000 11,328,000
270,000 4,320,000
15,648,000
HARGA JUMLAH
SATUAN HARGA KET
Rp Rp
100,000 3,700,000
125,000 1,875,000
159,120 795,600
200,000 200,000
162,600 975,600
63,000 3,087,000
63,000 126,000
104,000 312,000
20,800 228,800
23,400 46,800
23,400 187,200
26,000 390,000
53,950 53,950
53,950 323,700
71,500 357,500
533,000 533,000
533,000 533,000
250,000 250,000
110,000 220,000
90,000 180,000
250,000 250,000
14,625,150
D Pekerjaan Plumbing
1 Pekerjaan Air Bersih
Instalasi Pipa PVC AW lengkap dengan fiting:
PVC AW 1" m' 50.00 14,365 718,250
PVC AW 3/4" m' 12.00 11,278 135,330
PVC AW 1/2" m' 26.00 10,075 261,950
Ball Valve 1" bh 1.00 195,000 195,000
Suprame
Suprame
Suprame
Suprame
Suprame
Suprame
Suprame
Suprame
Suprame
Suprame
KITANI
Ega/Clipsal
Ega/Clipsal
Ega/Clipsal
Ega/Clipsal
Ega/Clipsal
Unible
-
Panasonic
Philips
Philips
Philips
Philips
Brocco
KDK
Panasonic
Panasonic
Panasonic ( WNJ6009 + WNJ5001-701 )
Panasonic ( WNJ6015 + WNJ5001-701 )
Panasonic
Panasonic
Panasonic
MK
MERLIN GERIN
MERLIN GERIN
MERLIN GERIN
MERLIN GERIN
MERLIN GERIN
Eterna
Eterna
Eterna
Hager
DAFTAR KEBUTUHAN MATRIAL M&E
PROYEK FUTSAL - PRAKASA
RENGASDENGKLOK - KARAWANG
HARGA
NO URAIAN SATUAN VOLUME JUMLAH HARGA MERK
SATUAN
I MATRIAL LISTRIK
1 NYY 4 x 6 mm2 m' 30,000 - Suprame
2 NYY 4 x 25 mm2 m' - Suprame
3 NYY 4 x 2,5 mm2 m' 50 16,500 825,000 Suprame
4 NYY 3 x 2,5 mm2 m' 50 12,500 625,000 Suprame
5 NYM 2 x 2.5 mm2 m' 850 6,785 5,767,250 Suprame
6 NYM 3 x 2.5 mm2 m' 950 8,740 8,303,000 Suprame
7 NYM 4 x 2.5 mm2 m' - 11,500 - Suprame
8 K. Telphone 2 x 2 x 0,6 mm2 m' - 6,785 - Suprame
9 BC 6 mm2 m' - 6,785 -
10 BC 16 mm2 m' - 6,785 -
11 Ground Road 16 mm X 2,5m + cin2 m' - 6,785 -
12 Pipa conduit 20mm btg 485 8,050 3,904,250 Ega/Clipsal
13 Pipa Flexible 20mm roll 2 57,500 115,000 Ega/Clipsal
14 T.Doos Clipsal bh 250 3,450 862,500 Ega/Clipsal
15 Klem 20mm doos 550 518 284,625 Ega/Clipsal
16 Socket 20mm bh 750 518 388,125 Ega/Clipsal
17 Isolasi bh 10 6,095 60,950 Unible
18 Insulok 15cm @100bh pak 7 8,050 56,350 -
19 Insulok 30cm @100bh pak 2 27,600 55,200
20 Inbowdoos bh 20 2,415 48,300 Panasonic
22 Armatur Industri + ESS 85W (aluminium) set 72 323,438 23,287,500 Philips
23 Armatur Industri + ESS 85W ( acrilik) set 6 323,438 1,940,625 Philips
24 TKO 1 X 36 W set 87 95,000 8,265,000 Philips
25 TL T4 1 X 20 W set - 51,750 - Sinyoku
26 Down Light 4" + ESS 14 W set 24 57,500 1,380,000
27 Down Light 5" OB + ESS 14 W ( W : Hitam ) set 4 132,250 529,000
28 Armatur TL Bambu + TL 36 W ( W : Hitam ) set - 138,000 - Philips
29 Fiting Persegi + ESS 11W set 18 42,090 757,620 Brocco
30 Exhausefan 12" ( Wall ) set 7 385,250 2,696,750 KDK
31 Saklar Hotel ( Standart White ) bh - 14,950 - Panasonic
32 Saklar Tunggal ( Standart White ) bh 9 14,375 129,375 Panasonic
33 Saklar Serrie ( Standart White ) bh 19 21,390 406,410 Panasonic
34 Greet Switch 9 Gang + Inbow bh - 204,700 - Panasonic ( WNJ6009 + WNJ5001-701 )
35 Greet Switch 15 Gang + Inbow bh 1 339,250 339,250 Panasonic ( WNJ6015 + WNJ5001-701 )
36 Stop Kontak Listrik ( Standart White ) bh 43 16,215 697,245 Panasonic
37 Stop Kontak Telphone ( Standart White ) bh 6 51,750 310,500 Panasonic
39 MCCB NS 100N 63A 3P4T bh 821,560 - MERLIN GERIN
40 MCB NC 45a 20A 3P bh 207,000 - MERLIN GERIN
41 MCB NC 45a 10A 1P bh 40,135 - MERLIN GERIN
42 MCB NC 45a 16A 1P bh 40,135 - MERLIN GERIN
43 MCB NC 45a 20A 1P bh 40,135 - MERLIN GERIN
44 Busbar Nol/Ground U/ 20 skruup set 28,750 -
45 Rell MCB btg 12,075 -
46 Busbar Sisir 3P btg 108,100 -
47 Pilot Lamp ( Type LED " merah, kuning, hijau ) bh 10,925 -
48 Ampere meter 100/5A (72x72) bh 44,850 -
49 Volt meter 0-500V (72x72) bh 44,850 -
50 CT 100/5A bh 31,050 -
51 Volt Selector Switch bh 51,750 -
52 Fuse kubur bh 6,900 -
53 Kabel NYAF 1.5mm m' 2,415 - Eterna
54 Kabel NYAF 10mm m' 14,375 - Eterna
55 Kabel NYAF 16mm m' 20,700 - Eterna
56 Skun kabel 1,5mm bh 173 -
57 Skun kabel 2,5mm bh 201 -
58 Skun kabel 6mm bh 518 -
59 Skun kabel 10mm bh 863 -
60 Skun kabel 25mm + Vinil bh 1,955 -
61 BOX MCB 12 Gang bh 2 161,000 322,000 Hager
62 Lampu Neon Emergency 20W bh 224,250 -
1 Besi CNP 100X50X20X3,2mm btg -
2 Besi Siku 40X40X4mm btg -
3 Besi Beton 10mm - 12m btg -
4 Besi Beton 8mm - 12m btg -
5 Besi Plat strip 4mm X 30mm - 6m btg -
6 Kawat Seng 4mm @50Kg m' -
7 Long Drat M10 @100cm m' -
8 Ring 10mm @2bh bh -
9 Skrup 14mm @2bh bh -
10 Seling 6mm @22m m' -
11 Klem seling 1/2" bh -
12 Span skrup M8 set -
62,356,825
DAYA BUANG RATA-RATA PERLENGKAPAN SANITER FUTSAL 09
DAYA
NO JENIS SANITER VOLUME JUMLAH SATUAN
BUANG
Menurut Tabel C : Perlu air bersih dingin : 0,25 X 160 ltr/mnt = 40 ltr/mnt
Pipa penyalur Dia 1" ; Pompa Air 450 Watt
Roof Tank Kap. 2M3
09
KETERANGAN
PERINCIAN BIAYA PEMAKAIAN LISTRIK
PROYEK FUTSAL 2
DAYA 50KVA
HARGA
NO URAIAN STUAN VOLUME SATUAN
( Rp )
JUMLAH
Keterangan :
Biaya tersebut di atas di sepakati menjadi Rp. 1.620,000,-/bulan
( Satu juta enam ratus dua puluh ribu rupiah )
dan di bayarkan terhitung mulai September 2009 sampai selesai proyek dan atau
pemutusan pemakaian listrik ke proyek tersebut.
Mengetahui,
PT. BUKIT MURIA JAYA ESTATE KONTRAKTOR
Rp1,620,000
0,000,-/bulan
ONTRAKTOR
DAFTAR MATRIAL
PEKERJAAN M&E
PROYEK FUTSAL 09
KARAWANG RESINDA
I PEKERJAAN ELECTRIKAL
1 BOX PANEL Plat T:2mm
Finis cat powder coating
2 ACCESORIS PANEL
MCCB EZC 100F 3P 10Ka Merlin Gerin German
MCB NC 45a 1P 6Ka Merlin Gerin German
6 Pipa instalasi
Semua intalasi lampu & stop kontak
dalam piapa conduit hig impac 20mm Conduit 20mm Clipsal/Ega Indonesia
II PLUMBING
1 Pekerjaan Air Bersih PVC AW Wavin Indonesia
Fiting JIS K-6743 Rucika Indonesia
2 Pekerjaan Air Kotor PVC D Wavin Indonesia
Fiting JIS K-6743 Rucika Indonesia
3 Pekerjaan Talang Hujan PVC D Wavin Indonesia
Fiting JIS K-6743 Rucika Indonesia
4 Ball Valve Kw.1 KITZ Indonesia
DAFTAR KEBUTUHAN MATRIAL M&E
PROYEK FUTSAL - PRAKASA
RENGASDENGKLOK - KARAWANG Periode : 17 Januari 2011
VOLUME
SATUAN
JUMLAH
INDO - HARGA JUMLAH
NO URAIAN PITCH GANG
OFFICE
TRONIC POS
GENSET SATUAN HARGA
MERK
1,2,3 TERAS LT 1 PARKIR
&2
I INSTALASI KABEL POWER
1 NYY 3 x 4 mm2 m' 100 100 - Suprame
2 NYY 4 x 10 mm2 m' 0 52,932 - Suprame
3 NYY 4 x 16 mm2 m' 0 78,100 - Suprame
4 BC 6 mm2 m' 5 5 10 6,050 60,500
5 BC 16 mm2 m' 5 5 10 15,345 153,450
6 Ground Road 16 mm X 2,5m + cin2 m' 1 1 1 1 4 66,000 264,000
477,950
II INSTALASI LAMPU
1 NYM 2 x 2.5 mm2 m' 500 300 100 400 30 1330 7,920 10,533,600 Suprame
2 NYM 3 x 2.5 mm2 m' 400 50 200 10 660 10,285 6,788,100 Suprame
3 NYM 4 x 2.5 mm3 m' 200 13,420 - Suprame
3 NYY 3 x 2.5 mm3 m' 0 11,858 - Suprame
4 Pipa conduit 20mm btg 230 225 50 150 10 665 7,975 5,303,375 Ega/Clipsal
5 Pipa Flexible 20mm roll 1 0.5 0.25 1 0 2.75 71,500 196,625 Ega/Clipsal
6 T.Doos Clipsal bh 15 50 15 75 12 167 3,850 642,950 Ega/Clipsal
7 Klem 20mm doos 100 0 50 200 350 495 173,250 Ega/Clipsal
8 Socket 20mm bh 200 100 50 200 10 560 495 277,200 Ega/Clipsal
9 Isolasi bh 6 6 5,830 34,980 Unible
10 Insulok 15cm @100bh pak 6 3 9 8,250 74,250 -
11 Insulok 30cm @100bh pak 2 2 2 6 26,400 158,400
12 Inbowdoos bh 3 5 20 2 30 1,870 56,100 Panasonic
24,238,830
III INSTALASI STOP KONTAK
1 NYM 3 x 2.5 mm2 m' 202 269 471 10,285 4,844,235 Suprame
3 Pipa conduit 20mm btg 70 92 162 7,975 1,291,950 Ega/Clipsal
4 Pipa Flexible 20mm roll 1 1 2 71,500 143,000 Ega/Clipsal
5 T.Doos Clipsal bh 15 30 45 3,850 173,250 Ega/Clipsal
6 Klem 20mm doos 100 200 300 495 148,500 Ega/Clipsal
7 Socket 20mm bh 100 100 200 495 99,000 Ega/Clipsal
8 Isolasi bh 0 5,830 - Unible
9 Insulok 15cm @100bh pak 0 8,250 - -
10 Insulok 30cm @100bh pak 1 1 2 26,400 52,800
11 Inbowdoos bh 2 2 1,870 3,740 Panasonic
6,756,475
IV INSTALASI POWER AC
1 NYM 3 x 2.5 mm2 m' 20 131 151 10,285 1,553,035 Suprame
3 Pipa conduit 20mm btg 7 44 51 7,975 406,725 Ega/Clipsal
4 Pipa Flexible 20mm roll 0 71,500 - Ega/Clipsal
5 T.Doos Clipsal bh 0 3,850 - Ega/Clipsal
6 Klem 20mm doos 20 100 120 495 59,400 Ega/Clipsal
7 Socket 20mm bh 10 80 90 495 44,550 Ega/Clipsal
8 Isolasi bh 0 5,830 - Unible
9 Insulok 15cm @100bh pak 0 8,250 - -
2,063,710
V INSTALASI TELPHONE
1 K. Telphone 2 x 2 x 0,6 mm2 m' 50 50 100 1,650 165,000 Suprame
2 Pipa conduit 20mm btg 17 17 34 7,975 271,150 Ega/Clipsal
3 Pipa Flexible 20mm roll 0 71,500 - Ega/Clipsal
4 T.Doos Clipsal bh 2 2 4 3,850 15,400 Ega/Clipsal
5 Klem 20mm doos 50 50 100 495 49,500 Ega/Clipsal
6 Socket 20mm bh 50 50 100 495 49,500 Ega/Clipsal
7 Isolasi bh 0 5,830 - Unible
8 Insulok 15cm @100bh pak 0 8,250 - -
9 Insulok 30cm @100bh pak 0 26,400 -
10 Inbowdoos bh 0 1,870 - Panasonic
550,550
VI ARMARTUR LAMPU & ACCESSORIES
1 Armatur Industri + ESS 65W (aluminium) set 72 72 291,500 20,988,000 Philips
2 Armatur Industri + ESS 65W ( acrilik) set 6 6 874,500 5,247,000 Philips
3 TKO 1 X 36 W set 34 38 72 89,870 6,470,640 Philips
4 TL T4 1 X 20 W set 0 - Sinyoku
5 Down Light 5" + ESS 14 W set 19 17 36 59,400 2,138,400
6 Down Light 5" OB + ESS 14 W ( W : Hitam ) set 0 143,000 -
7 Lampu Kolom + ESS 14 W ( W : Hitam ) set 5 5 - Philips
8 Fiting Persegi + ESS 11W set 0 41,250 - Brocco
9 Exhausefan 12" ( Wall ) set 3 3 385,000 1,155,000 KDK
10 Saklar Hotel ( Standart White ) bh 0 - Panasonic
11 Saklar Tunggal ( Standart White ) bh 4 4 15,180 60,720 Panasonic
12 Saklar Serrie ( Standart White ) bh 6 6 22,550 135,300 Panasonic
13 Greet Switch 9 Gang + Inbow bh 1 1 195,800 195,800 Panasonic
14 Greet Switch 15 Gang + Inbow bh 0 324,500 - Panasonic
15 Stop Kontak Listrik ( Standart White ) bh 0 17,600 - Panasonic
16 Stop Kontak Telphone ( Standart White ) bh 0 47,850 - Panasonic
17 Stop Kontak TV ( Standart White ) bh 0 51,370 - Panasonic
18 Stop Kontak AC ( Standart White ) bh 0 61,600 - Panasonic
19 Lampu Emergency TL 1X20W bh 0 214,500 - Panasonic
36,390,860
VII PANEL & ACCESSORIES
1 MCCB NS 100N 63A 3P4T bh 0 - MG
2 MCCB EZC100F 30A 3P bh 0 426,580 - MG
3 MCB NC 45a 20A 3P bh 0 203,500 - MG
4 MCB NC 45a 16A 3P bh 0 203,500 - MG
5 MCB NC 45a 10A 1P bh 0 39,490 - MG
6 MCB NC 45a 16A 1P bh 0 39,490 - MG
7 MCB NC 45a 20A 1P bh 0 39,490 - MG
8 Busbar Nol/Ground U/ 20 skruup set 0 46,750 - MG
9 Rell MCB btg 0 19,250 -
10 Busbar Sisir 3P btg 0 122,100 -
11 Pilot Lamp ( Type LED " merah, kuning, hijau ) bh 0 13,200 -
12 Ampere meter 100/5A (72x72) bh 0 72,600 -
13 Volt meter 0-500V (72x72) bh 0 72,600 -
14 CT 100/5A bh 0 59,400 -
15 Volt Selector Switch bh 0 72,600 -
16 Fuse kubur bh 0 10,285 -
17 Kabel NYAF 1.5mm m' 0 2,398 - Eterna
18 Kabel NYAF 10mm m' 0 17,600 - Eterna
19 Kabel NYAF 16mm m' 0 26,400 - Eterna
20 Skun kabel 1,5mm bh 0 193 -
21 Skun kabel 2,5mm bh 0 209 -
22 Skun kabel 6mm bh 0 545 -
23 Skun kabel 10mm bh 0 880 -
24 Skun kabel 16mm bh 0 1,650 -
25 Skun kabel 25mm + Vinil bh 0 1,980 -
26 BOX MCB 12 Gang bh 0 130,900 - PRESTO
27 Ohm Saklar 4P-50A Mertz bh 0 2,277,000 - Mertz
-
PENAWARAN HARGA
PEKERJAAN MEKANIKAL & ELECTRIKAL
PROYEK FUTSAL PRAKASA
RENGASDENGKLOK - KARAWANG
HARGA JUMLAH
NO URAIAN SATUAN VOLUME SATUAN HARGA KETERANGAN
Rp Rp
I PEKERJAAN M&E LAPANG FUTSAL & AREA SERVICE unt 1.00 97,181,901 101,908,951
IKHWAN
PENAWARAN UPAH BORONG
PEKERJAAN MEKANIKAL & ELECTRIKAL
PROYEK FUTSAL PRAKASA
RENGASDENGKLOK - KARAWANG
HARGA JUMLAH
NO URAIAN SATUAN VOLUME SATUAN HARGA KETERANGAN
Rp Rp
I PEKERJAAN M&E LAPANG FUTSAL & AREA SERVICE unt 1.00 11,917,500 11,917,500
IKHWAN
HARGA JUMLAH
NO URAIAN SATUAN VOLUME SATUAN HARGA KETERANGAN
Rp Rp
D Pekerjaan Plumbing
1 Pekerjaan Air Bersih
Instalasi Pipa PVC AW lengkap dengan fiting:
PVC AW 1" m' 50.00 7,500 375,000
PVC AW 3/4" m' 12.00 7,500 90,000
PVC AW 1/2" m' 26.00 7,500 195,000
Ball Valve 1" bh 1.00 7,500 7,500
HARGA JUMLAH
NO URAIAN SATUAN VOLUME SATUAN HARGA KETERANGAN
Rp Rp
D Pekerjaan AC
1 Instalasi Power AC ttk 4.00 50,000 200,000
SUB TOTAL D 200,000
E Pekerjaan Plumbing
1 Pekerjaan Air Bersih
Instalasi Pipa PVC AW lengkap dengan fiting:
PVC AW 3/4" m' 24.00 7,500 180,000
PVC AW 1/2" m' 18.00 7,500 135,000
HARGA JUMLAH
NO URAIAN SATUAN VOLUME SATUAN HARGA KETERANGAN
Rp Rp
D Pekerjaan AC
1 Instalasi Power AC ttk 4.00 50,000 200,000
SUB TOTAL D 200,000
E Pekerjaan Plumbing
1 Pekerjaan Air Bersih
Instalasi Pipa PVC AW lengkap dengan fiting:
PVC AW 3/4" m' 12.00 7,500 90,000
PVC AW 1/2" m' 12.00 7,500 90,000
HARGA JUMLAH
NO URAIAN SATUAN VOLUME SATUAN HARGA KETERANGAN
Rp Rp
C Pekerjaan Plumbing
1 Pekerjaan Air Bersih
Instalasi Pipa PVC AW lengkap dengan fiting:
PVC AW 1" m' 50.00 7,500 375,000
PVC AW 1/2" m' 16.00 7,500 120,000
Ball Valve 1" bh 1.00 7,500 7,500
I MATRIAL INSTALASI
1 NYY 4 x 16 mm4 m' 150 71,000
2 NYY 4 x 10 mm3 m' 100 48,120
3 NYY 4 x 4 mm3 m' 200 32,500
4 NYY 3 x 2,5 mm2 m' 50 10,780
5 NYM 2 x 2.5 mm2 m' 1,200 7,200
6 NYM 3 x 2.5 mm2 m' 1,200 9,350
7 NYM 4 x 2.5 mm2 m' 200 12,200
8 K. Telphone 2 x 2 x 0,6 mm2 m' 100 1,750
9 K. Audio/Spiker 2 x 1,5 mm3 m' 200 1,750
9 BC 6 mm2 m' 50 5,500
10 BC 16 mm2 m' 10 13,950
11 Ground Road 16 mm X 2,5m + cin2 m' 5 60,000
12 Pipa conduit 20mm btg 500 7,250
13 Pipa Flexible 20mm roll 3 65,000
14 T.Doos Clipsal ( 3 & 4 ) bh 200 3,500
15 Klem 20mm doos 5 45,000
16 Socket 20mm bh 1,000 450
17 Isolasi bh 15 5,300
18 Insulok 15cm @100bh pak 10 7,500
19 Insulok 30cm @100bh pak 10 24,000
20 Inbowdoos bh 100 1,700
21 Mesin bor 16mm bh 1 450,000
II MATRIAL ACCESSORIES
1 Armatur Industri ( Aluminium ) + ESS 65W Philip set 72 265,000
2 Armatur Industri ( Acrilik ) + ESS 65W Philip set 6 795,000
3 TKI 1 X 36 W set 28 81,700
4 TKO 1 X 36 W set 29 81,700
5 Down Light 5" + ESS 14 W set 17 54,000
6 Down Light 5" OB + ESS 14 W Mini ( W : Hitam ) set 9 130,000
7 Fiting Persegi + ESS 14W set 23 37,500
8 Exhausefan 12" ( Ciling ) set 7 350,000
9 Saklar Tunggal ( Standart White ) bh 8 13,800
10 Saklar Serrie ( Standart White ) bh 22 20,500
11 Greet Switch 15 Gang + Inbow bh 1 295,000
12 Stop Kontak Listrik ( Standart White ) bh 41 16,000
13 Stop Kontak Telphone ( Standart White ) bh 3 43,500
14 Stop Kontak AC bh 8 56,500
II MATRIAL PANEL
1 Box Panel uk. 50X60X20cm T:2mm Warna Gray bh 2 300,000
2 Box Panel uk. 40X50X20cm T:2mm Warna Gray bh 1 250,000
3 BOX MCB 12 Gang ex. Hager bh 2 119,000
4 MCCB EZC100F 30A 3P bh 1 387,800
5 MCCB EZC100F 20A 3P bh 2 387,800
6 MCB NC 45a 16A 3P bh 4 185,000
7 MCB NC 45a 6A 1P bh 6 35,900
8 MCB NC 45a 10A 1P bh 51 35,900
9 MCB NC 45a 16A 1P bh 10 35,900
10 Busbar Nol/Ground set 3 42,500
11 Rell MCB btg 2 17,500
12 Busbar Sisir 3P btg 3 111,000
13 Pilot Lamp ( Type LED " merah, kuning, hijau ) bh 9 12,000
14 Ampere meter 100/5A (72x72) bh 6 66,000
15 Volt meter 0-500V (72x72) bh 2 66,000
16 CT 100/5A bh 6 54,000
17 Volt Selector Switch bh 2 66,000
18 Fuse kubur bh 9 9,350
19 Kabel NYAF 1.5mm m' 200 2,180
20 Kabel NYAF 6mm m' 10 12,000
21 Kabel NYAF 10mm m' 5 16,000
22 Skun kabel 1,5mm bh 300 175
23 Skun kabel 2,5mm bh 400 190
24 Skun kabel 6mm bh 100 495
25 Skun kabel 10mm + Vinil bh 100 800
26 Skun kabel 16mm + Vinil bh 20 1,500
27 OHM SAKLAR 4P 32A bh 2 2,070,000
IKHWAN
JUMLAH
MERK
HARGA
10,650,000 Suprame
4,812,000 Suprame
6,500,000 Suprame
539,000 Suprame
8,640,000 Suprame
11,220,000 Suprame
2,440,000 Suprame
175,000 Suprame
350,000
275,000
139,500
300,000
3,625,000 Ega/Clipsal
195,000 Ega/Clipsal
700,000 Ega/Clipsal
225,000 Ega/Clipsal
450,000 Ega/Clipsal
79,500 Unible
75,000 -
240,000
170,000 Panasonic
450,000 Makita
19,080,000 Philips
4,770,000 Philips
2,287,600 Philips
2,369,300 Philips
918,000
1,170,000
862,500 Brocco
2,450,000 Panasonic
110,400 Panasonic
451,000 Panasonic
295,000 Panasonic ( WNJ6015 + WNJ5001-701 )
656,000 Panasonic
130,500 Panasonic
452,000 Panasonic
100,384,650
110,423,115
35,600,000
146,023,115