NOMO KONTRAK
URAIAN PEKERJAAN SATUAN Harga Satuan Jumlah Harga
R VOLUME
E PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
I PEKERJAAN ELEKTRIKAL
A
I DISTRIBUSI LISTRIK
A PEKERJAAN PANEL & KABEL TEGANGAN RENDAH
1 P. Lift set 1 131,250,000 131,250,000
2 Panel Pompa air bersih set 1 3,360,000 3,360,000
3 Panel SDP-BKD set 1 9,660,000 9,660,000
4 Panel PP\/LP-DS (Lantai Dasar) set 1 5,250,000 5,250,000
5 Panel PP\/LP-1 set 1 5,250,000 5,250,000
6 Panel PP\/LP-2 set 1 5,250,000 5,250,000
7 Panel PP\/LP-3 set 1 5,250,000 5,250,000
8 Panel PP.AC-DS (Lantai Dasar) set 1 5,250,000 5,250,000
9 Panel PP.AC-1 set 1 5,250,000 5,250,000
10 Panel PP.AC-2 set 1 5,250,000 5,250,000
11 Panel PP.AC-3 set 1 5,250,000 5,250,000
12 Panel PP. LP\/OP set 1 7,875,000 7,875,000
13 Panel PP\/LP SV set 1 5,775,000 5,775,000
14 Panel PP\/LP CAT1 set 1 5,775,000 5,775,000
15 Panel PP\/LP CAT2 set 1 6,510,000 6,510,000
16 Panel Pompa Roof set 1 3,360,000 3,360,000
17 Kabel Tray 300 x 100 m 261 342,615 89,491,038
18 Kabel Tray 200 x 100 m 356 202,020 71,888,817
19 Tray T 300 x 100 bh 7 656,565 4,595,955
20 Tray T 200 x 100 bh 5 352,170 1,760,850
21 Tray Elbow 300 x 100 bh 11 712,320 7,835,520
22 Tray Elbow 200 x 100 bh 8 674,310 5,394,480
23 Kabel NYFGBY 4 x 300 mm Dari LVMDP ke Panel SDP BKD m 102 3,281,187 334,681,074
24 NYY 4x10 mm+BC 10mm dari Panel SDP BKD ke Panel pompa m 25 133,770 3,344,250
25 FRC 4x16 mm+BC 16mm dari Panel SDP - BKD ke Panel Lift m 102 252,525 25,757,550
26 FRC 2x1x2,5 mm dari Panel SDP BKD ke Main Control Fire Alarm m 75 35,490 2,661,750
27 Kabel NYY 4x10 mm+BC 10 mm dari SDP-BKD ke PP\/LP-DS (Lantai m 5 121,485 607,425
28 Kabel NYY 4x16 mm +BC 16 mm dari SDP-BKD ke PP\/LP.1 m 20 185,640 3,712,800
29 Kabel NYY 4x16 mm+BC 16 mm dari SDP-BKD ke PP\/LP.2 m 25 185,640 4,641,000
30 Kabel NYY 4x16 mm+BC 16 mm dari SDP-BKD ke PP\/LP.3 m 30 185,640 5,569,200
31 Kabel NYY 4x10 mm+BC 10 mm dari SDP-BKD ke PP.AC-DS (Lantai m 10 121,485 1,214,850
32 Kabel NYY 4x25 mm+BC 25 mm dari SDP-BKD ke PP.AC-1 m 20 272,727 5,454,540
33 Kabel NYY 4x25 mm+BC 25 mm dari SDP-BKD ke PP.AC-2 m 25 272,727 6,818,175
34 Kabel NYY 4x70 mm+BC 70mm dari SDP-BKD ke PP.AC-3 m 30 668,850 20,065,500
35 Kabel NYY 4x10 mm+BC 10 mm dari P Lift ke P.Booster m 40 121,485 4,859,400
Jumlah 815,919,174
II INSTALASI PENERANGAN DAN KOTAK-KOTAK
A A. POWER HOUSE
1 TL BALK ,LED 2x8 Watt (60cm) bh 2.00 338,520 677,040
2 Wall Exhaust Fan + 2000cmh, 75W\/220V bh 2.00 645,645 1,291,290
3 Saklar Ganda bh 1.00 32,760 32,760
4 Instalasi Penerangan NYM 3x2,5 mm dalam conduit 20mm titik 2.00 415,800 831,600
5 Instalasi kotak kontak Dinding NYM 3x2,5 dalam conduil 20mm titik 2.00 468,195 936,390
6 Outlet kotak kontak Dinding bh 2.00 286,650 573,300
B B. LANTAI DASAR -
1 Downlight inbow LED 9 watt\/E27 bh 50.00 155,610 7,780,500
2 TL BALK ,LED 2x8 Watt (60cm) bh 2.00 338,520 677,040
3 TL BALK ,LED 2x18 Watt (120cm) bh 28.00 505,050 14,141,400
4 RM Inbow, TL LED 2x18 watt (120 cm) bh 28.00 313,950 8,790,600
5 Baret Square, E27, LED bulb 4 watt \/SCCB E27 LED BULB 4W ACR bh 6.00 174,720 1,048,320
6 Ceiling Exhaust Fan + 470cmh, 12W\/220V bh 9.00 595,140 5,356,260
7 Saklar Ganda bh 14.00 32,760 458,640
8 Saklar Tunggal bh 19.00 28,665 544,635
9 Saklar Hotel bh 3.00 32,760 98,280
10 Instalasi Penerangan NYM 3x2,5 mm dalam conduit 20mm titik 123.00 415,800 51,143,400
11 Instalasi kotak kontak Dinding NYM 3x2,5 dalam conduil 20mm titik 26.00 468,195 12,173,070
12 Outlet kotak kontak Dinding bh 26.00 286,650 7,452,900
C C. LANTAI 1 -
1 Downlight inbow LED 9 watt\/E27 bh 79.00 155,610 12,293,190
2 Downlight inbow LED 12 watt\/E27 bh 31.00 75,075 2,327,325
3 RM Inbow, TL LED 2x18 watt (120 cm) bh 21.00 313,950 6,592,950
4 RM Inbow, TL LED 2x8 watt (60 cm) bh 6.00 191,100 1,146,600
5 Baret Square, E27, LED bulb 4 watt \/SCCB E27 LED BULB 4W ACR bh 6.00 174,720 1,048,320
6 Ceiling Exhaust Fan + 470cmh, 12W\/220V bh 9.00 595,140 5,356,260
7 Saklar Ganda bh 20.00 32,760 655,200
8 Saklar Tunggal bh 26.00 28,665 745,290
9 Saklar Hotel bh 3.00 32,760 98,280
10 Instalasi Penerangan NYM 3x2,5 mm dalam conduit 20mm titik 174.00 415,800 72,349,200
11 Instalasi kotak kontak Dinding NYM 3x2,5 dalam conduil 20mm titik 36.00 468,195 16,855,020
12 Outlet kotak kontak Dinding bh 36.00 286,650 10,319,400
13 Instalasi kotak kontak Lantai NYM 3x2,5 dalam conduil 20mm titik 44.00 415,800 18,295,200
14 Kotak kontak Lantai bh 44.00 286,650 12,612,600
15 Lampu sorot LED 20 Watt Fasad bh 2.00 212,940 425,880
16 Lampu sorot LED 50 Watt Fasad bh 12.00 485,940 5,831,280
17 Lampu Spot Light LED 20 Watt Fasad bh 8.00 116,025 928,200
D D. LANTAI 2 -
1 Downlight inbow LED 9 watt\/E27 bh 55.00 155,610 8,558,550
2 Downlight inbow LED 12 watt\/E27 bh 12.00 75,075 900,900
3 RM Inbow, TL LED 2x18 watt (120 cm) bh 50.00 313,950 15,697,500
4 Baret Square, E27, LED bulb 9 watt \/SCCB E27 LED BULB 4W ACR bh 11.00 176,085 1,936,935
5 Ceiling Exhaust Fan + 470cmh, 12W\/220V bh 9.00 595,140 5,356,260
6 Saklar Ganda bh 19.00 32,760 622,440
7 Saklar Tunggal bh 22.00 28,665 630,630
8 Saklar Hotel bh 3.00 32,760 98,280
9 Instalasi Penerangan NYM 3x2,5 mm dalam conduit 20mm titik 147.00 415,800 61,122,600
10 Instalasi kotak kontak Dinding NYM 3x2,5 dalam conduil 20mm titik 48.00 468,195 22,473,360
11 Outlet kotak kontak Dinding bh 48.00 286,650 13,759,200
12 Instalasi kotak kontak Lantai NYM 3x2,5 dalam conduil 20mm bh 48.00 415,800 19,958,400
13 Kotak kontak Lantai bh 48.00 286,650 13,759,200
14 Lampu Spot Light LED 20 Watt Fasad bh 8.00 116,025 928,200
15 Lampu sorot 20 Watt Fasad bh 2.00 121,485 242,970
E E. LANTAI 3 - -
1 Downlight inbow LED 9 watt\/E27 bh 63.00 155,610 9,803,430
2 Downlight inbow LED 12 watt\/E27 bh 125.00 75,075 9,384,375
3 RM Inbow, TL LED 2x8 watt (60 cm) bh 14.00 191,100 2,675,400
4 Baret Square, E27, LED bulb 9 watt \/SCCB E27 LED BULB 4W ACR bh 8.00 176,085 1,408,680
11 Instalasi Alarm Bell, NYA 1c x 2 x 1,5mm dalam conduit 20mm titik 10.00 53,550 535,500
12 Instalasi Lampu Indikator, NYA 1c x 2 x 1,5mm dalam conduit 20mm titik 10.00 53,550 535,500
Jumlah 1,680,000,000
B PEKERJAAN ELEKTRIKAL BALAI
I DISTRIBUSI LISTRIK
A PENAMBAHAN DAN PEMINDAHAN DAYA LISTRIK
1 Biaya Penyambungan baru VA 555,000.00 5,775,000 5,775,000
2 Uang Jaminan Pelanggan (UJL) VA 555,000.00 26,250,000 26,250,000
3 Biaya SLO VA 555,000.00 3,045,000 3,045,000
4 Biaya NIDI Ls 1.00 2,205,000 2,205,000
5 Biaya Administrasi Ls 1.00 5,250,000 5,250,000
B PEKERJAAN INSTALASI TM 20 KV -
1 Panel TM 20 KV unit 1.00 35,910,000 35,910,000
2 Terminasi TM set 2.00 2,835,000 5,670,000
3 Kabel Feeder dari Gardu PLN ke Panel TM 20 KV N2XSEBY 4 X 95 mm m 35.00 490,140 17,154,900
A PERALATAN UTAMA
1 UNIT IPAL BFHC 10 MPD, KAPASITAS 10 M3\/HARI (P = 400, D=150) m 1.00 56,700,000 56,700,000
3 Pompa filter air bersih (Kapasitas 5 m3\/ jam, Head 25 m, Power set 2.00 12,600,000 25,200,000
0.75kW, 380 V, 3 Ph)
Filter Air Hydro STN6 (Tinggi 220cm dan diameter 60 cm, Bobot 300 kg, 33,600,000 33,600,000
4 Kapasitas 6m3\/ jam, Bahan mild steel lapis cat, Tekanan 7-8 Bar, Media set 1.00
profex 30 x30 mesh)
5 Grountank Tank Air bersih utama 19 m3 unit 1.00 67,200,000 67,200,000
6 Sub Grountank Tank Air bersih Bangunan Balai 4 m3 unit 1.00 3,412,500 3,412,500
7 Sub Grountank Tank Air bersih Bangunan Balai 6 m3 unit 1.00 5,880,000 5,880,000
B AREA RUMAH POMPA - -
1 Pipa Hider air bersih PPR PN 16 3 m 6.00 166,189 997,133
2 Pipa air bersih PPR PN 16 2 m 4.00 82,924 331,695
3 Pipa air bersih PPR PN 16 1,5 m 16.00 52,553 840,840
4 Gate valve 1,5 m 10.00 922,950 9,229,500
5 Gate valve 2 m 1.00 1,302,000 1,302,000
6 Check valve 1,5 m 4.00 828,450 3,313,800
7 Foot Valve 1,5 m 4.00 286,650 1,146,600
8 Fleksible Joint 1,5 m 4.00 1,638,000 6,552,000
9 Strainer 1,5 m 4.00 1,546,545 6,186,180
10 Floating Valve 2 m 2.00 - -
C INSTALASI PEMIPAAN AIR BERSIH AREA SITE - -
1 Pipa HDPE SDR PN 16 1,5 ( Pengisian Sub Grountank Bangunan Balai m 72.00 52,553 3,783,780
dengan Pompa )
2 Pipa HDPE SDR PN 16 2 ( Pengisian Sub Grountank Bangunan BKD m 27.00 82,924 2,238,941
Center dengan Grvitasi )
3 Pipa HDPE SDR PN 16 2 ( Pengisian Grountank utama dari PDAM ) m 110.00 82,924 9,121,613
4 Pipa HDPE SDR PN 16 2 (Dari Groundtank ke gedung BKD) m 75.00 82,924 6,219,281
5 Pipa HDPE SDR PN 16 2 (Dari Groundtank ke gedung BALAI) m 35.00 82,924 2,902,331
6 Pipa HDPE SDR PN 16 2 (Dari Sumur ke Groundtank) m 70.00 82,924 5,804,663
7 Pipa HDPE SDR PN 16 1.1\/4 (Dari Groundtank menuju Instalasi Sampit m 35.00 73,500 2,572,500
BALAI)
8 Gate valve 1.1\/4 bh 3.00 672,000 2,016,000
D TESTING & COMMISSIONING -
1 Testing & Commissioning Peralatan dan Instalasi air bersih Lot 1.00 1,260,000 1,260,000
Jumlah 245,169,356
II PEKERJAAN SISTEM HIDRANT SPRINKLER
A PERALATAN UTAMA
1 Main Diesel Pump (Capaciy 113,5 m3\/h (500 GPM), Head 76-84 Meter, set 1.00 106,050,000 106,050,000
Power 68 KW)
2 Main Electric Pump (Capaciy 113,5 m3\/h (500 GPM), Head 79-96 set 1.00 127,050,000 127,050,000
Meter, Power 75 KW)
3 Jocky Pump (Capaciy 5 m3\/h, Head 82 Meter, Power 2,2 KW) set 1.00 45,150,000 45,150,000
4 Grountank Tank utama Hidrnt 70 m3 unit 1.00 121,800,000 121,800,000
B INSTALASI RUANG POMPA -
1 Pressure Tank (Kapasitas 1000 L, Working Pressure 10 Bar, Safety Unit 1.00 17,850,000 17,850,000
Valve 10 K 1\/2 inch NPT)
2 Header 8 inch (BSP 8 inch SCH 40, , Grade A) m 6.00 1,522,500 9,135,000
3 Pengadaan dan Pemasangan Katup-katup -
- Gate valve 20 K 60 mm bh 1.00 8,610,000 8,610,000
- Gate valve 20 K 100 mm bh 1.00 10,080,000 10,080,000
- Gate valve 20 K 150 mm bh 2.00 10,815,000 21,630,000
- Check valve 20 K 60 mm bh 1.00 9,345,000 9,345,000
- Check valve 20 K 100 mm bh 1.00 9,723,000 9,723,000
- Foot valve 100 mm bh 1.00 262,500 262,500
- Foot valve 60 mm bh 1.00 220,500 220,500
- Strainer 60 mm bh 1.00 1,270,500 1,270,500
- Strainer 100 mm bh 1.00 1,391,250 1,391,250
- Fleksible Joint 60 mm bh 1.00 1,270,500 1,270,500
- Fleksible Joint 100 mm bh 2.00 1,391,250 2,782,500
4 Automatic Air Vent Valve 2 Set 1.00 588,000 588,000
C INSTALASI HIDRANT LINGKUNGAN (HIDRANT SITE) -
I INSTALASI HIDRANT SPRINKLER -
1 Black Steel Hidrant. 40 dia - 6 m 28.00 1,095,150 30,664,200
2 Black Steel Hidrantt. 40 dia - 4 m 561.00 483,000 270,963,000
3 EQUIPMENT -
- Hidrant Halaman two way + outdoor Hidrant Box Unit 8.00 6,388,200 51,105,600
- Standing Siamese (Pengadaaan dan Pemasangan Katup - katup) Unit 2.00 616,350 1,232,700