NO URAIAN PEKERJAAN
I ELEKTRIKAL
I. A. PENGADAAN DAN PEMASANGAN PANEL
I. B. PENGADAAN DAN PEMASANGAN KABEL DISTRIBUSI
I. C. PENGADAAN DAN PEMASANGAN CABEL LADDER DAN CABLE TRAY
I. D. PENGADAAN DAN PEMASANGAN LAMPU , SAKLAR DAN KOTAK-KONTAK
I. E. PENGADAAN DAN PEMASANGAN PENANGKAL PETIR
I. F. PENGADAAN DAN PEMASANGAN PENTANAHAN / GROUNDING
II ELEKTRONIK
II. A. PENGADAAN DAN PEMASANGAN FIRE ALARM
II. B. PENGADAAN DAN PEMASANGAN TATA SUARA
II. C. PENGADAAN DAN PEMASANGAN IP TELEPHONE DATA/LAN/WIFI
II. D. PENGADAAN DAN PEMASANGAN CCTV
II. E. PENGADAAN DAN PEMASANGAN LCD PROYEKTOR
IV PEMADAM KEBAKARAN
IV.A. PIPA HYDRANT
IV.B. PIPA SPRINKLER
V PLAMBING
V.A. PEMASANGAN DAN INSTALASI PIPA PLAMBING AIR BERSIH
V.B. PEMASANGAN DAN INSTALASI PIPA PLAMBING AIR KOTOR
V.C. PEMASANGAN DAN INSTALASI PIPA PLAMBING AIR HUJAN
VI BED LIFT
JUMLAH HARGA JUMLAH HARGA
(Rp.) (Rp.)
574,345,700
338,000,000
25,873,200
68,400,000
111,288,500
21,122,000
9,662,000
414,696,102
92,600,500
95,561,000
139,862,500
65,356,000
21,316,102
413,995,000
409,995,000
4,000,000
118,583,465
45,120,545
73,462,920
129,253,595
54744345.6
51,290,084
23,219,165
600,000,000
I ELEKTRIKAL
TOTAL I A 338,000,000
1.1 Kabel dari Panel MDP Gedung Lama ke SDP Gedung Baru ke Tr
NYY 4 x 50mm² + BC 50 mm2 mtr 30 421,390 12,641,700
1.1 Kabel dari Gedung Baru ke Panel Lantai Penerangan 1
NYM 4 x 6mm² + BC 6 mm2 mtr 6 85,000 510,000
1.2 Kabel dari Gedung Baru ke Panel Lantai Penerangan 2
NYM 4 x 6mm² + BC 6 mm2 mtr 9 85,000 765,000
1.3 Kabel dari Gedung Baru ke Panel Lantai Penerangan 3
NYM 4 x 6mm² + BC 6 mm2 mtr 13 85,000 1,105,000
1.4 Kabel dari Gedung Baru ke Panel Lantai Penerangan 4
NYM 4 x 35mm² + BC 35 mm2 mtr 15 306,500 4,597,500
1.4 Kabel dari Gedung Baru ke Panel Elektronika
NYM 4 x 4mm² + BC 4 mm2 mtr 6 69,000 414,000
1.4 Kabel dari Panel Lantai Penerangan 4 ke Unit Out door AC
NYM 4 x 10 mm² + BC 10 mm2 mtr 36 110,000 3,960,000
1.4 Kabel dari Panel Lantai Penerangan 4 ke Panel Lift
FRC 4 x 10 mm² + BC 10 mm2 mtr 6 188,000 1,128,000
1.4 Kabel dari Panel Lift ke Unit Lift
FRC 4 x 10 mm² + BC 10 mm2 mtr 4 188,000 752,000
TOTAL I B 25,873,200
1 CABLE LADDER
1.1 RISER
a. 250 x 100 mm mtr 12 250,000 3,000,000
b. 200 x 100 mm mtr 12 200,000 2,400,000
5/38
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SATUAN VOL
(Rp.) (Rp.)
2 CABLE TRAY
2.1 LANTAI 1
a. 250 x 100 mm mtr 40 275,000 11,000,000
b. 200 x 100 mm mtr 40 250,000 10,000,000
2.2 LANTAI 2
a. 250 x 100 mm mtr 40 275,000 11,000,000
b. 200 x 100 mm mtr 40 250,000 10,000,000
2.3 LANTAI 3 -
a. 250 x 100 mm mtr 40 275,000 11,000,000
b. 200 x 100 mm mtr 40 250,000 10,000,000
TOTAL I C 68,400,000
1 LANTAI 1
1.1 Lampu
a. Essensial LED 7 W, 3000k bh 13 145,000 1,885,000
b. Downlight Integrated LED 9 W, 3000k bh 45 200,000 9,000,000
c. Downlight Integrated LED 7 W, 3000k bh 14 200,000 2,800,000
d. Downlight Integrated LED 7 W, 3000k + Battery bh 3 800,000 2,400,000
e. Downlight Integrated LED 5 W, 3000k bh 3 185,000 555,000
f. WaterProof 2 x 18 W bh 1 300,000 300,000
g. Exit 5W + Battery bh 1 950,000 950,000
1.2 Saklar
Saklar tunggal bh 2 45,500 91,000
Saklar ganda bh 7 51,500 360,500
Saklar Hotel tunggal bh 1 55,000 55,000
1.3 Kotak-kontak
Kotak-kontak Dinding 1p/10A bh 23 46,000 1,058,000
Kotak-kontak Ceiling 1p/10A 46,000 -
Kotak-kontak Meja 1p/10A bh 65,000 -
Kotak-kontak Lantai 1p/10A bh 300,000 -
2 LANTAI 2
2.1 Lampu
a. Essensial LED 7 W, 3000k bh 145,000 -
b. Downlight Integrated LED 9 W, 3000k bh 34 200,000 6,800,000
c. Downlight Integrated LED 7 W, 3000k bh 20 200,000 4,000,000
d. Downlight Integrated LED 7 W, 3000k + Battery bh 3 800,000 2,400,000
e. Downlight Integrated LED 5 W, 3000k bh 4 185,000 740,000
f. WaterProof 2 x 18 W bh 1 300,000 300,000
g. Exit 5W + Battery bh 1 950,000 950,000
2.2 Saklar
Saklar tunggal bh 2 45,500 91,000
Saklar ganda bh 10 51,500 515,000
Saklar Hotel tunggal bh 1 55,000 55,000
6/38
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SATUAN VOL
(Rp.) (Rp.)
2.3 Kotak-kontak -
Kotak-kontak Dinding 1p/10A bh 26 46,000 1,196,000
Kotak-kontak Ceiling 1p/10A 46,000 -
Kotak-kontak Meja 1p/10A bh 65,000 -
Kotak-kontak Lantai 1p/10A bh 300,000 -
3 LANTAI 3
3.1 Lampu
a. Essensial LED 7 W, 3000k bh 145,000 -
b. Downlight Integrated LED 9 W, 3000k bh 50 200,000 10,000,000
c. Downlight Integrated LED 7 W, 3000k bh 12 200,000 2,400,000
d. Downlight Integrated LED 7 W, 3000k + Battery bh 3 800,000 2,400,000
e. Downlight Integrated LED 5 W, 3000k bh 3 185,000 555,000
f. WaterProof 2 x 18 W bh 1 300,000 300,000
g. Exit 5W + Battery bh 1 950,000 950,000
3.2 Saklar
Saklar tunggal bh 2 45,500 91,000
Saklar ganda bh 10 51,500 515,000
Saklar Hotel tunggal bh 1 55,000 55,000
3.3 Kotak-kontak -
Kotak-kontak Dinding 1p/10A bh 17 46,000 782,000
Kotak-kontak Ceiling 1p/10A 46,000 -
Kotak-kontak Meja 1p/10A bh 33 65,000 2,145,000
Kotak-kontak Lantai 1p/10A bh 6 300,000 1,800,000
TOTAL I D 111,288,500
2 KABEL
2.1 Kabel penghantar arus kejut NYA 1 x 70 mm² di dalam PVC Ø mtr 20 150,000 3,000,000
2.2 Kabel Daya Obstrction Light NYM 3 x 2,5 mm² di dalam PVC mtr 20 23,000 460,000
HI Conduit Ø 20 mm
7/38
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SATUAN VOL
(Rp.) (Rp.)
3.4 Inspection Control Box (500 x 500 x 500 mm) ls 1 750,000 750,000
TOTAL I E 21,122,000
TOTAL I F 9,662,000
TOTAL I 574,345,700
8/38
BILL OF QUANTITY MEP
PENGEMBANGN RS ARAFAH - SUKODONO
PAKET PEKERJAAN ELEKTRONIK -
II ELEKTRONIKA
Pengadaan dan Pemasangan Fire Alarm dan perlengkapan bantu lainnya sesuai gambar dan spesifikasi
1.1 MCP-FA
2 Loop (Semi Addressable) set 1 25,000,000 25,000,000
Battery Nicad Rechargeable
Power Surge Arrester
Instalasi Peralatan utama
1.2 PC Graphics set 1 15,000,000 15,000,000
Assy, FNL, Network Communication module
Inter i5 Processor, 16 GB Ram, 240 GB Hard Drive
1.3 Annunciator + Back box set 1 11,500,000 11,500,000
80 character display
1.2 JB-FA unit 3 650,000 1,950,000
Lengkap dengan Module Detector, Zone Module, Isolator module, control module
Kabel FRC STP 16 AWG, 1 PAIRS + FRC 2 X 1,5 mm2 (Dlm Pipa Konduit 3/4")
2.4 MCP-FA ke Annunciator mtr 10 22,000 220,000
3 LANTAI 1
3.1 DETECTOR
a. Photoelectric Smoke Detector bh 24 250,000 6,000,000
b. ROR Detector bh 9 200,000 1,800,000
c. Manual Breakglass bh 1 150,000 150,000
d. Alarm Bell bh 1 150,000 150,000
e. Alarm indicator lamp bh 1 250,000 250,000
3.2 INSTALASI
a. Instalasi Detector,
AWG RG#6, in PVC HI Conduit Ø 20 mm titik 33 123,000 4,059,000
b. Instalasi Manual Breakglass,
NYA 2x1,5mm² in PVC HI Conduit Ø 20 mm titik 1 123,000 123,000
c. Instalasi Alarm Bell dan Indicator Lamp,
NYA 2x1,5mm² in PVC HI Conduit Ø 20 mm titik 1 123,000 123,000
4 LANTAI 2
4.1 DETECTOR
9/38
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SATUAN VOL (Rp.) (Rp.)
a. Photoelectric Smoke Detector bh 30 250,000 7,500,000
b. ROR Detector bh 200,000 -
c. Manual Breakglass bh 1 150,000 150,000
d. Alarm Bell bh 1 150,000 150,000
e. Alarm indicator lamp bh 1 250,000 250,000
4.2 INSTALASI
a. Instalasi Detector,
AWG RG#6, in PVC HI Conduit Ø 20 mm titik 30 123,000 3,690,000
b. Instalasi Manual Breakglass,
NYA 2x1,5mm² in PVC HI Conduit Ø 20 mm titik 1 123,000 123,000
c. Instalasi Alarm Bell dan Indicator Lamp,
NYA 2x1,5mm² in PVC HI Conduit Ø 20 mm titik 1 123,000 123,000
5 LANTAI 3
5.1 DETECTOR
a. Photoelectric Smoke Detector bh 31 250,000 7,750,000
b. ROR Detector bh 200,000 -
c. Manual Breakglass bh 1 150,000 150,000
d. Alarm Bell bh 1 150,000 150,000
e. Alarm indicator lamp bh 1 250,000 250,000
5.2 INSTALASI
a. Instalasi Detector,
AWG RG#6, in PVC HI Conduit Ø 20 mm titik 31 123,000 3,813,000
b. Instalasi Manual Breakglass,
NYA 2x1,5mm² in PVC HI Conduit Ø 20 mm titik 1 123,000 123,000
c. Instalasi Alarm Bell dan Indicator Lamp,
NYA 2x1,5mm² in PVC HI Conduit Ø 20 mm titik 1 123,000 123,000
TOTAL II H 92,600,500
Pengadaan dan Pemasangan Tata Suara dan perlengkapan bantu lainnya sesuai gambar dan spesifikasi
3 LANTAI 1
3.1 SPEAKER
10/38
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SATUAN VOL (Rp.) (Rp.)
a. Ceiling Speaker 3 Watt bh 22 195,000 4,290,000
b. Column Speaker 6 Watt bh 1 200,000 200,000
d. Volume Control bh 4 200,000 800,000
4 LANTAI 2
4.1 SPEAKER
a. Ceiling Speaker 3 Watt bh 17 195,000 3,315,000
b. Column Speaker 6 Watt bh 1 200,000 200,000
d. Volume Control bh 4 200,000 800,000
5 LANTAI 3
5.1 SPEAKER
a. Ceiling Speaker 3 Watt bh 19 195,000 3,705,000
b. Column Speaker 6 Watt bh 1 200,000 200,000
d. Volume Control bh 4 200,000 800,000
TOTAL II I 95,561,000
11/38
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SATUAN VOL (Rp.) (Rp.)
2.1 PATCH PANEL/SB
Kabel FO, in PVC HI Cond. Ø 20 mm mtr 55 12,500 687,500
2.2 PATCH PANEL/1.A
Kabel FO, in PVC HI Cond. Ø 20 mm mtr 23 12,500 287,500
2.3 PATCH PANEL/1.B
Kabel FO, in PVC HI Cond. Ø 20 mm mtr 65 12,500 812,500
3 LANTAI 1
4 LANTAI 2
5 LANTAI 3
TOTAL II J 139,862,500
Pengadaan dan Pemasangan CCTV dan perlengkapan bantu lainnya sesuai gambar dan spesifikasi
12/38
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SATUAN VOL (Rp.) (Rp.)
RAM : 16GB
HDD : 2TB
SSD/eMMC : 512GB
Software : Windows 10, Home
Drive Optical : Multi DVD
Ethernet : RJ45
Monitor : 19 inches
Keyboard : Logitech Standard
Mouse : Logitech Standard
1.4 Rack 4U set 1 3,500,000 3,500,000
Patch Panel 24 Port included modular cat 6 set 1 1,500,000 1,500,000
Switch 24 port (Poe) set 1 1,500,000 1,500,000
Wiring Managemen set 1 750,000 750,000
2 LANTAI 1
3 LANTAI 2
4 LANTAI 3
TOTAL II K 65,356,000
13/38
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SATUAN VOL (Rp.) (Rp.)
Pengadaan dan Pemasangan CCTV dan perlengkapan bantu lainnya sesuai gambar dan spesifikasi
2 LANTAI 3
TOTAL II K 21,316,102
14/38
BILL OF QUANTITY MEP
PENGEMBANGN RS ARAFAH - SUKODONO
PAKET PEKERJAAN TATA UDARA -
PENGADAAN UNIT
1 LANTAI 1
15/38
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SATUAN VOL (Rp.) (Rp.)
Services : KORIDOR
Type : Split Duct Connection
Capacity : 24.000 btu/h (2,5 PK)
Power Supply : 1 phase, 220V, 50 Hz
Freon : R32/R410A
Pipa refrigerant (Liquid & Suction) lengkap dengan isolasi mtr 12 150,000 1,800,000
Pipa Drain Ø 2 " lengkap dengan isolasi mtr 6 57,500 345,000
2 LANTAI 2
16/38
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SATUAN VOL (Rp.) (Rp.)
Services : KORIDOR
Type : Split Duct Connection
Capacity : 24.000 btu/h (2,5 PK)
Power Supply : 1 phase, 220V, 50 Hz
Freon : R32/R410A
Pipa refrigerant (Liquid & Suction) lengkap dengan isolasi mtr 12 150,000 1,800,000
Pipa Drain Ø 2 " lengkap dengan isolasi mtr 6 57,500 345,000
3 LANTAI 3
17/38
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SATUAN VOL (Rp.) (Rp.)
Services : RUANG PERTEMUAN
Type : Split Duct Connection
Capacity : 14.000 btu/h (1,5 PK)
Power Supply : 1 phase, 220V, 50 Hz
Freon : R32/R410A
Pipa refrigerant (Liquid & Suction) lengkap dengan isolasi mtr 12 150,000 1,800,000
Pipa Drain Ø 2 " lengkap dengan isolasi mtr 6 57,500 345,000
3.8 IU-3.8 unit 2 6,500,000 13,000,000
Services : KORIDOR
Type : Split Duct Connection
Capacity : 18.000 btu/h (2 PK)
Power Supply : 1 phase, 220V, 50 Hz
Freon : R32/R410A
Pipa refrigerant (Liquid & Suction) lengkap dengan isolasi mtr 12 150,000 1,800,000
Pipa Drain Ø 2 " lengkap dengan isolasi mtr 6 57,500 345,000
3 LANTAI ATAP
2 VENTILASI FAN
1 LANTAI 1
18/38
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SATUAN VOL (Rp.) (Rp.)
1.3 CF.1.3 unit 1 350,000 350,000
Type : AXIAL
Services : TOILET 3
Kapasitas : 174 CMH
Ext. Static Press. : 75 Pa
Tegangan kerja : 220 V.AC/1p/50Hz
1.4 EF.1.4 unit 1 400,000 400,000
Type : WALL FAN
Services : TOILET
Kapasitas : 450 cfm
Ext. Static Press. : 0,45 inch WG
Tegangan kerja : 220 V.AC/1p/50Hz
LANTAI 2
LANTAI 3
19/38
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SATUAN VOL (Rp.) (Rp.)
Ext. Static Press. : 75 Pa
Tegangan kerja : 220 V.AC/1p/50Hz
20/38
BILL OF QUANTITY MEP
PENGEMBANGN RS ARAFAH - SUKODONO
PAKET PEKERJAAN PEMADAM KEBAKARAN -
IV MEKANIKAL
A PEMADAM KEBAKARAN
1 Lantai 1
2 Lantai 2
21/38
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SATUAN VOL (Rp.) (Rp.)
3 Lantai 3
2.1 Lantai 1
4.1.1 Branch Control Valve ( BCV ) lengkap dengan fitting dan set 1 3,500,000 3,500,000
accessories lainnya Ø 3 inchi
4.1.2 Head Sprinkler
pendant bh 17 113,000 1,921,000
Side Wall bh 1 123,000 123,000
4.1.3 Pengadaan dan instalasi pipa sprinkler Black Steel Pipe
medium lengkap dengan fitting dan accessories
BS Pipe Sch.40 : Ø 3 inchi mtr 20 254,120 5,082,400
: Ø 2,5 inchi mtr 20 175,500 3,510,000
: Ø 2 inchi mtr 20 152,152 3,043,040
: Ø 1 1/2 inchi mtr 20 112,350 2,247,004
: Ø 1 1/4 inchi mtr 20 98,630 1,972,596
: Ø 1 inchi mtr 20 81,030 1,620,600
2.2 Lantai 2
4.2.1 Branch Control Valve ( BCV ) lengkap dengan fitting dan set 1 3,500,000 3,500,000
accessories lainnya
4.2.2 Head Sprinkler
pendant bh 20 113,000 2,260,000
Side Wall bh 1 123,000 123,000
4.2.3 Pengadaan dan instalasi pipa sprinkler Black Steel Pipe
medium lengkap dengan fitting dan accessories
BS Pipe Sch.40 : Ø 3 inchi mtr 20 254,120 5,082,400
: Ø 2,5 inchi mtr 20 175,500 3,510,000
: Ø 2 inchi mtr 20 152,152 3,043,040
22/38
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SATUAN VOL (Rp.) (Rp.)
: Ø 1 1/2 inchi mtr 20 112,350 2,247,004
: Ø 1 1/4 inchi mtr 20 98,630 1,972,596
: Ø 1 inchi mtr 20 81,030 1,620,600
2.3 Lantai 3
4.3.1 Branch Control Valve ( BCV ) lengkap dengan fitting dan set 2 3,500,000 7,000,000
accessories lainnya
4.3.2 Head Sprinkler
pendant bh 22 113,000 2,486,000
Side Wall bh 1 123,000 123,000
4.3.3 Pengadaan dan instalasi pipa sprinkler Black Steel Pipe
medium lengkap dengan fitting dan accessories
BS Pipe Sch.40 : Ø 3 inchi mtr 20 254,120 5,082,400
: Ø 2,5 inchi mtr 20 175,500 3,510,000
: Ø 2 inchi mtr 20 152,152 3,043,040
: Ø 1 1/2 inchi mtr 20 112,350 2,247,004
: Ø 1 1/4 inchi mtr 20 98,630 1,972,596
: Ø 1 inchi mtr 20 81,030 1,620,600
23/38
BILL OF QUANTITY MEP
PENGEMBANGN RS ARAFAH - SUKODONO
PAKET PEKERJAAN PLUMBING -
V PLAMBING
1.2 LANTAI 2
- PVC AW : Ø 1 1/4 inchi mtr 25 44,375 1,109,380
: Ø 1 inchi mtr 20 37,000 740,000
: Ø 2/3 inchi mtr 20 25,000 500,000
: Ø 1/2 inchi mtr 26 19,000 494,000
- Gate Valve : Ø 1 1/4 inchi bh 2 350,000 700,000
- Fitting-fitting dan material bantu lot 1 853,014 853,014
1.3 LANTAI 3
- PVC AW : Ø 1 1/4 inchi mtr 25 44,375 1,109,380
: Ø 1 inchi mtr 20 37,000 740,000
: Ø 2/3 inchi mtr 20 25,000 500,000
: Ø 1/2 inchi mtr 26 19,000 494,000
- Gate Valve : Ø 1 1/4 inchi bh 2 350,000 700,000
- Fitting-fitting dan material bantu lot 1 853,014 853,014
2.1 LANTAI 1
- PIPA AIR KOTOR
Pipa PVC class AW : Ø 4 inchi mtr 16 124,500 1,992,001
: Ø 4 inchi (Riser) mtr 4 124,500 498,000
- PIPA AIR BEKAS
Pipa PVC class AW : Ø 3 inchi (Riser) mtr 4 100,500 402,000
: Ø 2 1/2 inchi mtr 22 84,500 1,858,998
: Ø 2 inchi mtr 12 57,500 690,000
: Ø 1 1/4 inchi mtr 8 44,375 355,002
- PIPA VENT
Pipa PVC class AW : Ø 3 inchi (Riser) mtr 4 100,500 402,000
: Ø 2 inchi mtr 12 57,500 690,000
: Ø 1 1/4 inchi mtr 12 44,375 532,502
- Floor Clean Out : Ø 4 inchi bh 2 174,500 349,000
: Ø 2 1/2 inchi bh 2 109,500 219,000
- Clean Out : Ø 4 inchi bh 2 174,500 349,000
: Ø 2 1/2 inchi bh 2 109,500 219,000
- Fitting-fitting dan material bantu lot 1 427,825 427,825
2.2 LANTAI 2
- PIPA AIR KOTOR
Pipa PVC class AW : Ø 4 inchi mtr 16 124,500 1,992,001
: Ø 4 inchi (Riser) mtr 4 124,500 498,000
- PIPA AIR BEKAS
Pipa PVC class AW : Ø 3 inchi (Riser) mtr 4 100,500 402,000
: Ø 2 1/2 inchi mtr 26 84,500 2,196,997
: Ø 2 inchi mtr 24 57,500 1,380,000
: Ø 1 1/4 inchi mtr 12 44,375 532,502
- PIPA VENT
Pipa PVC class AW : Ø 3 inchi (Riser) mtr 4 100,500 402,000
: Ø 2 inchi mtr 22 57,500 1,265,000
: Ø 1 1/4 inchi mtr 12 44,375 532,502
- Floor Clean Out : Ø 4 inchi bh 2 174,500 349,000
: Ø 2 1/2 inchi bh 2 109,500 219,000
- Floor Drain : Ø 4 inchi bh 2 174,500 349,000
: Ø 2 1/2 inchi bh 2 109,500 219,000
- Fitting-fitting dan material bantu lot 1 516,850 516,850
2.3 LANTAI 3
- PIPA AIR KOTOR
Pipa PVC class AW : Ø 4 inchi mtr 16 124,500 1,992,001
: Ø 4 inchi (Riser) mtr 4 124,500 498,000
- PIPA AIR BEKAS
Pipa PVC class AW : Ø 3 inchi (Riser) mtr 4 100,500 402,000
: Ø 2 1/2 inchi mtr 24 84,500 2,027,998
: Ø 2 inchi mtr 12 57,500 690,000
: Ø 1 1/4 inchi mtr 12 44,375 532,502
- PIPA VENT
Pipa PVC class AW : Ø 3 inchi (Riser) mtr 4 100,500 402,000
: Ø 2 inchi mtr 22 57,500 1,265,000
: Ø 1 1/4 inchi mtr 12 44,375 532,502
- Floor Clean Out : Ø 4 inchi bh 2 174,500 349,000
: Ø 2 1/2 inchi bh 2 109,500 219,000
- Floor Drain : Ø 4 inchi bh 2 174,500 349,000
: Ø 2 1/2 inchi bh 2 109,500 219,000
- Fitting-fitting dan material bantu lot 1 473,900 473,900
2.4 Sewage Treatment Plant (STP)
TOTAL V. C. 23,219,165
BILL OF QUANTITY MEP
PENGEMBANGN RS ARAFAH - SUKODONO
PAKET PEKERJAAN LIFT
HARGA SATUAN
NO URAIAN PEKERJAAN SATUAN VOL (Rp.)
SUB-TOTAL V
-
JUMLAH HARGA
(Rp.)
575,000,000
25,000,000
600,000,000
PROYEK PEMBANGUNAN GRAND INNA TUNJUNGAN SURABAYA
ANALISA MEP
dasar
Elektrical
2 WaterProof 2 x 18 W 1 bh
Armature+Lampu 1 bh 270,000
Material Bantu/support, dsb 1 ls 5,000
Upah 1 ls 25,000
Mekanikal
Pipa Hydrant
1 Head Sprinkler type pendant 1.0 bh 95,000
Material Support (sok, knee, dsb) 1 ls 3,000
Upah 1 ls 15,000
JUMLAH HARGA
-
170,000 -
5,000 -
25,000 -
200,000 -
-
- -
270,000 -
5,000 -
25,000 -
300,000 -
-
20,000 -
5,000 -
1,000 -
20,000 -
46,000 -
-
20,000 -
4,500 -
1,000 -
20,000 -
45,500 -
-
26,000 -
4,500 -
1,000 -
20,000 -
51,500 -
-
-
81,000 -
12,000 -
2,500 -
35,000 -
130,500 -
-
90,000 -
12,000 -
2,500 -
35,000 -
139,500 -
-
174,000 -
45,000 -
2,500 -
35,000 -
256,500 -
-
-
73,500 -
12,000 -
2,500 -
35,000 -
123,000 -
-
-
81,000 -
17,500 -
3,500 -
35,000 -
137,000 -
-
405,390 -
5,000 -
1,000 -
10,000 - m
421,390 -
-
292,500 -
5,000 -
1,000 -
8,000 - m
306,500 -
-
217,580 -
5,000 -
1,000 -
7,000 - m
230,580 -
-
149,000 -
5,000 -
1,000 -
6,000 - m
161,000 -
-
100,000 - m
4,000 -
1,000 -
5,000 - m
110,000 -
-
63,000 - m
2,500 -
500 -
3,000 - m
69,000 -
-
78,000 - m
2,500 -
500 -
4,000 - m
85,000 -
-
16,150 - m
3,000 -
850 -
2,500 - m
22,500 -
-
180,000 - m
3,500 -
500 -
4,000 -
188,000 -
-
-
-
-
-
165,000 - ls
7,000 - ls
29,500 -
201,500 -
- mtr
115,500 - ls
6,000 - ls
40,000 -
161,500 -
- mtr
87,500 - ls
5,000 - ls
32,000 -
124,500 -
- mtr
71,500 - ls
5,000 - ls
24,000 -
100,500 -
- mtr
61,500 - ls
3,000 - ls
20,000 -
84,500 -
-
38,500 -
3,000 -
16,000 -
57,500 -
-
32,375 -
2,000 -
10,000 -
44,375 -
-
27,500 -
1,500 -
8,000 -
37,000 -
-
-
95,000 -
3,000 -
15,000 -
113,000 -
-
105,000 -
3,000 -
15,000 -
123,000 -
-
-
272,300 -
16,000 -
56,000 -
344,300 -
-
197,120 -
15,000 -
42,000 -
254,120 -
-
127,500 -
13,000 -
35,000 -
175,500 -
-
110,152 -
12,000 -
30,000 -
152,152 -
-
80,350 -
11,000 -
21,000 -
112,350 -
-
71,130 -
10,000 -
17,500 -
98,630 -
-
58,030 -
9,000 -
14,000 -
81,030