PERHITUNGAN BIAYA PEMBANGUNAN JTM, JTR DAN Gardu Distribusi JASKONHAR JTM JTR GD 2022
TIDAK TERMASUK HARGA MATERIAL DISTRIBUSI UTAMA (MDU)
VOLUME/PENGADAAN
HARGA PENAWARAN
(Rp) (Rp)
a b c d e f g
A. SKTM
1 Penarikan kawat SKTM 3 x 240 mm 1 kms.
a. Material Utama
SKTM 3 x 240 mm² 1 kms Material PLN
Ligtning Arrester 3 bh Material PLN
End mof Outdoor 20 kV 3 x 150-240 mm2 (Setara 3M) 2 bh 11,096,800 22,193,600
Cable Lug Shearbolt 95-240 Sqmm 6 bh - -
Jointing Heatshrink Cable 3 Core, Size Cable (Setara 3M) + Connector 4 bh 13,570,200 54,280,800
Disconecting Switch (DS) 20 kV 1 Phs (SPM) 3 bh 9,938,400 29,815,200
Double Beugel + Mour Baut untuk pipa 5" (Opstig KTM ) 4 bh 194,000 776,000
Travers/ Cross arm UNP 100 x 50 x 5 x 2000 mm 3 bh 1,054,400 3,163,200
Besi L panjang 700 mm, 50x50x5mm. 2 bh 193,800 387,600
Mur Baut 1/2" x 50 mm 8 bh 17,000 136,000
Beugel + mur baut 2 bh 142,800 285,600
Double beugel / Clam Beugel 2 bh 133,000 266,000
Pipa galvanized 5" x 6.000 mm medium B 2 bh 2,612,400 5,224,800
Patok beton 20 x 20 x 70 cm tanda KTM PLN 20 bh 177,800 3,556,000
b. Pentanahan
Kawat AAAC 70 mm² 36 Meter Material PLN
Pipa galvanized 1" x 6.000 mm medium B 2 Buah 364,600 729,200
Stainless Steel Strap 6 Meter 34,600 207,600
Stopping Buckle 4 Buah 6,400 25,600
Link 25 x 25 mm 4 Buah 6,200 24,800
Pipa Arde 1,5 " x 3.000 mm lengkap 2 Set 960,600 1,921,200
Terminal lugs /Sepatu Cable Bimetal (Al/Cu) 70 mm² 2 Buah 147,800 295,600
Compression connector AL 70 - 70 mm2 ( CCO ) 2 Buah 37,000 74,000
c. Pemasangan
Pemasangan/penarikan 1 kms 442,272,000 442,272,000
JUMLAH Rp. 565,634,800
2 Penarikan kawat SKTM 3 x 150 mm 1 kms.
a. Material Utama
SKTM 3 x 150 mm² 1 kms Material PLN
Ligtning Arrester 3 bh Material PLN
End mof Outdoor 20 kV 3 x 150-240 mm2 (Setara 3M) 2 bh 11,096,800 22,193,600
Cable Lug Shearbolt 95-240 Sqmm 6 bh - -
Jointing Heatshrink Cable 3 Core, Size Cable (Setara 3M) + Connector 4 bh 13,570,200 54,280,800
Disconecting Switch (DS) 20 kV 1 Phs (SPM) 3 bh 9,938,400 29,815,200
Double Beugel + Mour Baut untuk pipa 5" (Opstig KTM ) 4 bh 194,000 776,000
Travers/ Cross arm UNP 100 x 50 x 5 x 2000 mm 3 bh 1,054,400 3,163,200
Besi L panjang 700 mm, 50x50x5mm. 2 bh 193,800 387,600
Mur Baut 1/2" x 50 mm 8 bh 17,000 136,000
Beugel + mur baut 2 bh 142,800 285,600
Double beugel / Clam Beugel 2 bh 133,000 266,000
Pipa galvanized 5" x 6.000 mm medium B 2 bh 2,612,400 5,224,800
Copper Compression Ground Rod Connector 5/8" 70 mm 20 bh 70,000 1,400,000
b. Pentanahan
Kawat AAAC 70 mm² 36 Meter Material PLN
Pipa galvanized 1" x 6.000 mm medium B 2 Buah 364,600 729,200
Stainless Steel Strap 6 Meter 34,600 207,600
Stopping Buckle 4 Buah 6,400 25,600
Link 25 x 25 mm 4 Buah 6,200 24,800
Pipa Arde 1,5 " x 3.000 mm lengkap 2 Set 960,600 1,921,200
Terminal lugs /Sepatu Cable Bimetal (Al/Cu) 70 mm² 2 Buah 147,800 295,600
Compression connector AL 70 - 70 mm2 ( CCO ) 2 Buah 37,000 74,000
c. Pemasangan
- Pemasangan/penarikan 1 kms 439,142,800 439,142,800
JUMLAH Rp. 560,349,600
2 Penarikan kawat SKTM 150 mm (khusus Pelanggan)
a. Material Utama
SKTM 3 x 150 mm² 0.05 kms Material PLN
Ligtning Arrester 3 bh Material PLN
End mof Outdoor 20 kV 3 x 150-240 mm2 (Setara 3M) 1 bh 11,096,800 11,096,800
End mof Indoor 20 kV 3 x 150-240 mm2 (Setara 3M) 1 bh 11,142,200 11,142,200
Cable Lug Shearbolt 95-240 Sqmm 6 bh - -
Disconecting Switch (DS) 20 kV 1 Phs (SPM) 3 bh 9,938,400 29,815,200
Double Beugel + Mour Baut untuk pipa 5" (Opstig KTM ) 2 bh 194,000 388,000
Beugel + mur baut pengikat pipa 3" + mur baut 1 bh 180,000 180,000
Travers/ Cross arm UNP 100 x 50 x 5 x 2000 mm 3 bh 1,054,400 3,163,200
Besi L panjang 700 mm, 50x50x5mm. 2 bh 193,800 387,600
Mur Baut 1/2" x 50 mm 8 bh 17,000 136,000
Beugel + mur baut 2 bh 142,800 285,600
Double beugel / Clam Beugel 2 bh 133,000 266,000
Pipa galvanized 5" x 6.000 mm medium B 1 bh 2,612,400 2,612,400
b. Pentanahan outdoor
Kawat AAAC 70 mm² 36 Meter Material PLN
Pipa galvanized 1" x 6.000 mm medium B 2 Buah 364,600 729,200
Stainless Steel Strap 6 Meter 34,600 207,600
Stopping Buckle 4 Buah 6,400 25,600
Link 25 x 25 mm 4 Buah 6,200 24,800
Pipa Arde 1,5 " x 3.000 mm lengkap 2 Set 960,600 1,921,200
Terminal lugs /Sepatu Cable Bimetal (Al/Cu) 70 mm² 2 Buah 147,800 295,600
Compression connector AL 70 - 70 mm2 ( CCO ) 2 Buah 37,000 74,000
c. Pentanahan indoor
halaman : 1
HARGA PENAWARAN PER PAKET PEKERJAAN CLUSTER PROPINSI SULAWESI BARAT PT ..........
PERHITUNGAN BIAYA PEMBANGUNAN JTM, JTR DAN Gardu Distribusi JASKONHAR JTM JTR GD 2022
TIDAK TERMASUK HARGA MATERIAL DISTRIBUSI UTAMA (MDU)
VOLUME/PENGADAAN
HARGA PENAWARAN
(Rp) (Rp)
a b c d e f g
Kawat BC draad 50 mm² 18 Meter 138,200 2,487,600
Kawat AAAC 70 mm² 9 Meter Material PLN
Mur Baut 1/2" x 50 mm 1 Buah 17,000 17,000
Pipa galvanized 1" x 6.000 mm medium B 1 Buah 364,600 364,600
Stainless Steel Strap 3 Meter 34,600 103,800
Stopping Buckle 2 Buah 6,400 12,800
Link 25 x 25 mm 2 Buah 6,200 12,400
Pipa Arde 1,5 " x 3.000 mm lengkap 3 Set 960,600 2,881,800
Terminal lugs /Sepatu Cable Bimetal (Al/Cu) 70 mm² 1 Buah 147,800 147,800
Bimetal compression joint ( AL / CU ) + Heatshrink 70 - 50 mm2 1 Buah 157,600 157,600
Terminal lugs /Sepatu Cable Cu 50 mm² 3 Buah 113,000 339,000
halaman : 2
HARGA PENAWARAN PER PAKET PEKERJAAN CLUSTER PROPINSI SULAWESI BARAT PT ..........
PERHITUNGAN BIAYA PEMBANGUNAN JTM, JTR DAN Gardu Distribusi JASKONHAR JTM JTR GD 2022
TIDAK TERMASUK HARGA MATERIAL DISTRIBUSI UTAMA (MDU)
VOLUME/PENGADAAN
HARGA PENAWARAN
(Rp) (Rp)
a b c d e f g
Ornament Cable for netral + bolt (Aksesoris Penggantung MVTIC) 960 set - -
Galvanized Steel Wire 70 mm2 1000 mtr 38,600 38,600,000
Pemasangan Tupang tarik 10 set 706,600 7,066,000
Penghalang panjat 35 Meter 220,000 7,700,000
Papan tanda kilat/ Tanda bahaya 36 Buah 110,000 3,960,000
Double Beugel + Mour Baut untuk pipa 5" (Opstig KTM ) 8 buah 194,000 1,552,000
b. Dudukan Jointing MVTIC 4 set
Besi L panjang 700 mm, 50x50x5mm. 16 Buah 193,800 3,100,800
Double beugel khusus 4 Buah 121,200 484,800
Plastic Strap For JTR (30 Cm) 12 Buah 5,000 60,000
Travers dudukan PHB TR 3 phasa lengkap (UNP 6,5 x 750 mm) 8 Buah 431,000 3,448,000
Bolt double arming 5/8" x300 mm 8 Buah 61,800 494,400
Mur Baut 1/2" x 50 mm 40 BUah 17,000 680,000
c. Pentanahan 2 Set
Kawat AAAC 70 mm² 36 Meter Material PLN
Pipa galvanized 1" x 6.000 mm medium B 2 Buah 364,600 729,200
Stainless Steel Strap 6 Meter 34,600 207,600
Stopping Buckle 4 Buah 6,400 25,600
Link 25 x 25 mm 4 Buah 6,200 24,800
Pipa Arde 1,5 " x 3.000 mm lengkap 2 Set 960,600 1,921,200
Terminal lugs /Sepatu Cable Bimetal (Al/Cu) 70 mm² 2 Buah 147,800 295,600
Compression connector AL 70 - 70 mm2 ( CCO ) 2 Buah 37,000 74,000
d. Pemasangan
- Pemasangan/penarikan 1 kms 78,977,000 78,977,000
JUMLAH Rp. 401,144,000
JARINGAN TEGANGAN MENENGAH
1 Penarikan kawat JTM 3 phasa 1 kms ( 240 mm)
a. Material Utama
- Kawat AAAC-S 240 mm² 3.15 kms Material PLN
b. Pemasangan
- Pemasangan/penarikan 1 kms 18,257,400 18,257,400
JUMLAH Rp. 18,257,400
1 Penarikan kawat JTM 3 phasa 1 kms (150 mm)
a. Material Utama
- Kawat AAAC-S 150 mm² 3.15 kms Material PLN
b. Pemasangan
- Pemasangan/penarikan 1 kms 15,649,200 15,649,200
JUMLAH Rp. 15,649,200
2 Penarikan kawat JTM 3 phasa 1 kms.
a. Material Utama
- Kawat AAAC/S 70 mm² 3.15 kms Material PLN
b. Pemasangan
- Pemasangan/penarikan 1 kms 13,041,000 13,041,000
JUMLAH Rp. 13,041,000
3 Penarikan kawat JTM 3 phasa 1 kms.
a. Material Utama
- Kawat AAAC 70 mm² 3.09 kms Material PLN
b. Pemasangan
- Pemasangan/penarikan 1 kms 11,895,400 11,895,400
JUMLAH Rp. 11,895,400
4 Penarikan Kawat JTM 1 phasa 1 kms
a. Material Utama
- Kawat AA3C/S 70 mm2 1.05 kms Material PLN
b. Pemasangan
- Pemasangan/Penarikan 1 kms 4,347,000 4,347,000
JUMLAH Rp. 4,347,000
5 Pemasangan LBS 20 kV
a. Material Utama
Pole mounted LBS 20 kV 630 Amper 1 Unit Material PLN
Ground Rod + Clamp 5/8" x 2 mtr 1 btg 337,800 337,800
Pipa galvanized 1" x 3.000 mm medium B 1 btg 154,000 154,000
Unimax clamp 50 mm² / split bolt line tap for B27 1 buah 65,200 65,200
Kawat BC draad 50 mm² 15 mtr 138,200 2,073,000
Terminal lugs /Sepatu Cable Cu 50 mm² 1 buah 113,000 113,000
Stainless Steel strap 2 mtr 34,600 69,200
Stopping Buckle Stainless Steel 2 buah 10,000 20,000
Link 25 x 50 mm 2 buah 8,800 17,600
b. Pemasangan 1 Unit 4,814,200 4,814,200
JUMLAH Rp. 7,664,000
6 Pemasangan Cut Out 3 phasa 20 kV (konstruksi jaringan percabangan)
a. Material Utama
Cut Out 100 Amper 20 kV 3 bh Material PLN -
Fuselink 8A 3 bh - -
Compression connector AL 70 - 150 mm2 ( CCO ) 3 bh 50,200 150,600
Terminal lugs /Sepatu Cable Bimetal (Al/Cu) 70 mm² 6 bh 147,800 886,800
Tekep Isolator FCO bagian atas (untuk 1 phasa) 3 bh - -
Tekep Isolator FCO bagian bawah (untuk 1 phasa) 3 bh - -
b. Pemasangan 1 set 529,800 529,800
JUMLAH Rp. 1,567,200
halaman : 3
HARGA PENAWARAN PER PAKET PEKERJAAN CLUSTER PROPINSI SULAWESI BARAT PT ..........
PERHITUNGAN BIAYA PEMBANGUNAN JTM, JTR DAN Gardu Distribusi JASKONHAR JTM JTR GD 2022
TIDAK TERMASUK HARGA MATERIAL DISTRIBUSI UTAMA (MDU)
VOLUME/PENGADAAN
HARGA PENAWARAN
(Rp) (Rp)
a b c d e f g
7 Pemasangan Cut Out 3 phasa 20 kV (konstruksi jaringan lurus)
a. Material Utama
Cut Out 100 Amper 20 Kv 3 bh Material PLN
Fuselink 8A 3 bh - -
Compression connector AL 70 - 150 mm2 ( CCO ) 3 bh 50,200 150,600
Travers dudukan fuse cut out/Arrester UNP 10 x 2000 mm 1 bh 1,054,400 1,054,400
Besi L panjang 700 mm, 50x50x5mm. 1 bh 193,800 193,800
Terminal lugs /Sepatu Cable Bimetal (Al/Cu) 70 mm² 6 bh 147,800 886,800
double beugel khusus 1 set 121,200 121,200
Mur Baut 1/2" x 50 mm 1 bh 17,000 17,000
b. Pemasangan
Pemasangan FCO 3 phasa 20 Kv (Untuk percabangan Lurus) 1 set 1,288,200 1,288,200
Pemasangan Travers TM 20 KV UNP 10 panjang 2 - 2,4 Mtr 1 bh 379,200 379,200
JUMLAH Rp. 4,091,200
8 Pems.pembesian & isolator tumpu Tgl 20KV 3 PH UNP 10 3pl pd t.btn (Konstruksi 2 - 1)
a. Material Utama
Pin post insulator 20 KV 3 bh Material PLN
F Neck Plastic Top Ties Semicon A3C_S 150 mm2 3 bh 167,600 502,800
Travers dudukan fuse cut out/Arrester UNP 10 x 2000 mm 1 bh 1,054,400 1,054,400
Besi L panjang 700 mm, 50x50x5mm. 0 bh 193,800 -
Bolt double arming 5/8" x350 mm 2 bh 67,000 134,000
Mur Baut 1/2" x 50 mm 1 bh 17,000 17,000
Penghalang panjat 1 bh 220,000 220,000
Papan tanda kilat/ Tanda bahaya 1 bh 110,000 110,000
Stainless Steel strap 1 mtr 34,600 34,600
Stopping Buckle Stainless Steel 1 bh 10,000 10,000
b. Pemasangan 1 set 4,032,000 4,032,000
JUMLAH Rp. 6,114,800
9 Pems.pembesian & isolator tumpu gd 20KV 3 PH UNP 10 3pl pd.t.btn (Konstruksi 2 - 1)
a. Material Utama
Pin post insulator 20 KV 6 bh Material PLN
F Neck Plastic Double Side Ties Semicon A3C_S 150 mm2 3 Set 225,800 677,400
Travers dudukan fuse cut out/Arrester UNP 10 x 2000 mm 2 bh 1,054,400 2,108,800
Bolt double arming 5/8" x350 mm 4 bh 67,000 268,000
Besi L panjang 700 mm, 50x50x5mm. 0 bh 193,800 -
Mur Baut 1/2" x 50 mm 2 bh 17,000 34,000
Penghalang panjat 1 bh 220,000 220,000
Papan tanda kilat/ Tanda bahaya 1 bh 110,000 110,000
Stainless Steel strap 1 mtr 34,600 34,600
Stopping Buckle Stainless Steel 1 bh 10,000 10,000
b. Pemasangan 1 set 7,834,800 7,834,800
JUMLAH Rp. 11,297,600
10 Pems.pembesian & isolator tumpu Tgl 20KV 3 PH Consul UNP 10 3pl pd t.btn
a. Material Utama
Pin post insulator 20 KV 3 bh Material PLN
F Neck Plastic Top Ties Semicon A3C_S 150 mm2 3 bh 167,600 502,800
Travers dudukan fuse cut out/Arrester UNP 10 x 2000 mm 1 bh 1,054,400 1,054,400
Travers dudukan fuse cut out/Arrester UNP 10 x 2400 mm 2 bh 1,352,200 2,704,400
Besi L panjang 700 mm, 50x50x5mm. 1 bh 193,800 193,800
double beugel khusus 2 bh 121,200 242,400
Mur Baut 1/2" x 50 mm 10 bh 17,000 170,000
Bolt double arming 5/8" x350 mm 1 bh 67,000 67,000
Penghalang panjat 1 bh 220,000 220,000
Papan tanda kilat/ Tanda bahaya 1 bh 110,000 110,000
Stainless Steel strap 2 mtr 34,600 69,200
Stopping Buckle Stainless Steel 2 bh 10,000 20,000
b. Pemasangan 1 set 5,043,200 5,043,200
JUMLAH Rp. 10,397,200
11 Pems.pembesian & isolator tumpu gd 20KV 3 PH Consul UNP 10 3pl pd t.btn
a. Material Utama
Pin post insulator 20 KV 6 bh Material PLN
F Neck Plastic Double Side Ties Semicon A3C_S 70 mm2 3 Set 225,200 675,600
Travers dudukan fuse cut out/Arrester UNP 10 x 2000 mm 2 bh 1,054,400 2,108,800
Travers dudukan fuse cut out/Arrester UNP 10 x 2400 mm 2 bh 1,352,200 2,704,400
Bolt double arming 5/8" x350 mm 5 bh 67,000 335,000
Besi L panjang 700 mm, 50x50x5mm. 2 bh 193,800 387,600
double beugel khusus 2 set 121,200 242,400
Mur Baut 1/2" x 50 mm 12 bh 17,000 204,000
Penghalang panjat 1 bh 220,000 220,000
Papan tanda kilat/ Tanda bahaya 1 bh 110,000 110,000
Stainless Steel strap 2 mtr 34,600 69,200
Stopping Buckle Stainless Steel 2 bh 10,000 20,000
b. Pemasangan 1 set 8,898,800 8,898,800
JUMLAH Rp. 15,975,800
12 Pems.pembesian & isolator aspan gd 20KV 3 PH Consul UNP 10 3pl pd t.btn
a. Material Utama
Isolator tarik 20 KV lengkap accessories type suspension 6 set Material PLN
Pin post insulator 20 KV 1 bh Material PLN
F Neck Plastic Top Ties Semicon A3C_S 70 mm2 1 bh 158,800 158,800
Compression tension joint AAAC 70 mm2 3 bh 120,800 362,400
Travers dudukan fuse cut out/Arrester UNP 10 x 2000 mm 2 bh 1,054,400 2,108,800
Travers dudukan fuse cut out/Arrester UNP 10 x 2400 mm 2 bh 1,352,200 2,704,400
Bolt double arming 5/8" x350 mm 5 bh 67,000 335,000
Mur Baut 5/8" x 250 mm 0 bh 83,400 -
Besi L panjang 700 mm, 50x50x5mm. 2 bh 193,800 387,600
halaman : 4
HARGA PENAWARAN PER PAKET PEKERJAAN CLUSTER PROPINSI SULAWESI BARAT PT ..........
PERHITUNGAN BIAYA PEMBANGUNAN JTM, JTR DAN Gardu Distribusi JASKONHAR JTM JTR GD 2022
TIDAK TERMASUK HARGA MATERIAL DISTRIBUSI UTAMA (MDU)
VOLUME/PENGADAAN
HARGA PENAWARAN
(Rp) (Rp)
a b c d e f g
Mur Baut 1/2" x 50 mm 12 bh 17,000 204,000
double beugel khusus 1 bh 121,200 121,200
Penghalang panjat 1 bh 220,000 220,000
Papan tanda kilat/ Tanda bahaya 2 mtr 110,000 220,000
Stainless Steel strap 2 bh 34,600 69,200
Stopping Buckle Stainless Steel 2 set 10,000 20,000
b. Pemasangan 1 set 4,597,600 4,597,600
JUMLAH Rp. 11,509,000
13 Pems.pembesian & isolator aspan gd 20KV 3 PH Consul UNP 10 3pl t. ujung pd t.btn
a. Material Utama
Isolator tarik 20 KV lengkap accessories type suspension 3 set Material PLN
Travers dudukan fuse cut out/Arrester UNP 10 x 2000 mm 2 bh 1,054,400 2,108,800
Travers dudukan fuse cut out/Arrester UNP 10 x 2400 mm 2 bh 1,352,200 2,704,400
Bolt double arming 5/8" x350 mm 5 bh 67,000 335,000
Besi L panjang 700 mm, 50x50x5mm. 2 bh 193,800 387,600
Mur Baut 1/2" x 50 mm 12 bh 17,000 204,000
Penghalang panjat 1 bh 220,000 220,000
Papan tanda kilat/ Tanda bahaya 1 bh 110,000 110,000
Stainless Steel strap 2 mtr 34,600 69,200
Stopping Buckle Stainless Steel 2 bh 10,000 20,000
double beugel khusus 2 set 121,200 242,400
b. Pemasangan 1 set 2,241,800 2,241,800
JUMLAH Rp. 8,643,200
14 Pems.pembesian & isolator aspan gd (60° - 90°/AU2x) 20KV 3 PH Consul UNP 10 3pl t. ujung pd t.btn
a. Material Utama
Isolator tarik 20 KV lengkap accessories type suspension 6 set Material PLN
Pin post insulator 20 KV 2 bh Material PLN
F Neck Plastic Top Ties Semicon A3C_S 70 mm2 2 bh 158,800 317,600
Compression tension joint AAAC 70 mm2 3 bh 120,800 362,400
Travers dudukan fuse cut out/Arrester UNP 10 x 2000 mm 4 bh 1,054,400 4,217,600
Travers dudukan fuse cut out/Arrester UNP 10 x 2400 mm 2 bh 1,352,200 2,704,400
Bolt double arming 5/8" x350 mm 8 bh 67,000 536,000
Besi L panjang 700 mm, 50x50x5mm. 4 bh 193,800 775,200
Mur Baut 1/2" x 50 mm 16 bh 17,000 272,000
Penghalang panjat 1 bh 220,000 220,000
Papan tanda kilat/ Tanda bahaya 1 bh 110,000 110,000
Stainless Steel strap 2 mtr 34,600 69,200
Stopping Buckle Stainless Steel 2 bh 10,000 20,000
double beugel khusus 2 set 121,200 242,400
b. Pemasangan 1 set 6,377,400 6,377,400
JUMLAH Rp. 16,224,200
15 Pems.pembesian & isolator afspan tgl 20KV 3PH UNP 10 3pl pd t.btn
a. Material Utama
Isolator tarik 20 KV lengkap accessories type suspension 3 set Material PLN
Pin post insulator 20 KV 1 set Material PLN
F Neck Plastic Top Ties Semicon A3C_S 150 mm2 1 167,600 167,600
Compression tension joint AAAC 150 mm2 3 bh 200,000 600,000
Travers dudukan fuse cut out/Arrester UNP 10 x 2000 mm 2 bh 1,054,400 2,108,800
Mur Baut 5/8" x 350mm 2 bh 32,700 65,400
Mur Baut 5/8" x 250 mm 3 bh 83,400 250,200
Besi L panjang 700 mm, 50x50x5mm. 2 bh 193,800 387,600
Mur Baut 1/2" x 50 mm 2 bh 17,000 34,000
Penghalang panjat 1 bh 220,000 220,000
Papan tanda kilat/ Tanda bahaya 1 bh 110,000 110,000
Stainless Steel strap 1 mtr 34,600 34,600
Stopping Buckle Stainless Steel 1 bh 10,000 10,000
b. Pemasangan 1 set 1,896,600 1,896,600
JUMLAH Rp. 5,884,800
16 Pems.pembesian & isolator afspan gd type H 20KV 3PH UNP 10 3pl pd t.btn
a. Material Utama
Isolator tarik 20 KV lengkap accessories type suspension 6 set Material PLN
Pin post insulator 20 KV 2 set Material PLN
F Neck Plastic Top Ties Semicon A3C_S 150 mm2 2 bh 167,600 335,200
Compression tension joint AAAC 150 mm2 3 bh 200,000 600,000
Travers dudukan fuse cut out/Arrester UNP 10 x 2400 mm 2 bh 1,352,200 2,704,400
Bolt double arming 5/8" x350 mm 5 bh 67,000 335,000
Besi L panjang 700 mm, 50x50x5mm. 4 bh 193,800 775,200
Mur Baut 5/8" x 300 mm 1 bh 94,000 94,000
Mur Baut 1/2" x 50 mm 4 bh 17,000 68,000
Penghalang panjat 2 bh 220,000 440,000
Papan tanda kilat/ Tanda bahaya 2 bh 110,000 220,000
b. Pemasangan 1 set 4,745,200 4,745,200
JUMLAH Rp. 10,317,000
17 Pems.pembesian & isolator afspan gd 20KV 3PH UNP 10 3pl pd t.btn
a. Material Utama
Isolator tarik 20 KV lengkap accessories type suspension 6 set Material PLN
Pin post insulator 20 KV 1 bh Material PLN
F Neck Plastic Top Ties Semicon A3C_S 150 mm2 1 buah 167,600 167,600
Compression tension joint AAAC 150 mm2 3 bh 200,000 600,000
Heatshrink / Isolasi Bakar Hitam/warna 150mm 3 bh 83,200 249,600
Travers dudukan fuse cut out/Arrester UNP 10 x 2000 mm 2 bh 1,054,400 2,108,800
Bolt double arming 5/8" x350 mm 3 bh 67,000 201,000
Besi L panjang 700 mm, 50x50x5mm. 2 bh 193,800 387,600
Mur Baut 5/8" x 300 mm 1 bh 94,000 94,000
Mur Baut 1/2" x 50 mm 2 bh 17,000 34,000
Penghalang panjat 1 bh 220,000 220,000
Papan tanda kilat/ Tanda bahaya 1 bh 110,000 110,000
b. Pemasangan 1 set 3,586,400 3,586,400
halaman : 5
HARGA PENAWARAN PER PAKET PEKERJAAN CLUSTER PROPINSI SULAWESI BARAT PT ..........
PERHITUNGAN BIAYA PEMBANGUNAN JTM, JTR DAN Gardu Distribusi JASKONHAR JTM JTR GD 2022
TIDAK TERMASUK HARGA MATERIAL DISTRIBUSI UTAMA (MDU)
VOLUME/PENGADAAN
HARGA PENAWARAN
(Rp) (Rp)
a b c d e f g
JUMLAH Rp. 7,759,000
halaman : 6
HARGA PENAWARAN PER PAKET PEKERJAAN CLUSTER PROPINSI SULAWESI BARAT PT ..........
PERHITUNGAN BIAYA PEMBANGUNAN JTM, JTR DAN Gardu Distribusi JASKONHAR JTM JTR GD 2022
TIDAK TERMASUK HARGA MATERIAL DISTRIBUSI UTAMA (MDU)
VOLUME/PENGADAAN
HARGA PENAWARAN
(Rp) (Rp)
a b c d e f g
18 Pems.pembesian & isolator afspan tunggal 20KV 3PH UNP 10 t.ujung t.btn
a. Material Utama
Isolator tarik 20 KV lengkap accessories type suspension 3 set Material PLN
Pin post insulator 20 KV bh Material PLN
F Neck Plastic Top Ties Semicon A3C_S 150 mm2 0 bh 167,600 -
Compression tension joint AAAC 150 mm2 0 bh 200,000 -
Travers dudukan fuse cut out/Arrester UNP 10 x 2000 mm 2 bh 1,054,400 2,108,800
Bolt double arming 5/8" x350 mm 3 bh 67,000 201,000
Mur Baut 5/8" x 300 mm 1 bh 94,000 94,000
Mur Baut 1/2" x 50 mm 2 bh 17,000 34,000
Besi L panjang 700 mm, 50x50x5mm. 2 bh 193,800 387,600
Penghalang panjat 1 bh 220,000 220,000
Papan tanda kilat/ Tanda bahaya 1 bh 110,000 110,000
b. Pemasangan 1 set 1,602,000 1,602,000
JUMLAH Rp. 4,757,400
19 Pems.pembesian & isolator aspan gd (60° - 90°/AU2x) 20KV 3 PH UNP 10 3pl t.ujung pd t.btn
a. Material Utama
Isolator tarik 20 KV lengkap accessories type suspension 6 set Material PLN
Pin post insulator 20 KV 2 bh Material PLN
F Neck Plastic Top Ties Semicon A3C_S 70 mm2 2 bh 158,800 317,600
Compression tension joint AAAC 70 mm2 3 bh 120,800 362,400
Travers dudukan fuse cut out/Arrester UNP 10 x 2000 mm 4 bh 1,054,400 4,217,600
Bolt double arming 5/8" x350 mm 6 bh 67,000 402,000
Mur Baut 5/8" x 300 mm 2 bh 94,000 188,000
Mur Baut 1/2" x 50 mm 4 bh 17,000 68,000
Besi L panjang 700 mm, 50x50x5mm. 4 bh 193,800 775,200
Penghalang panjat 1 bh 220,000 220,000
Papan tanda kilat/ Tanda bahaya 1 bh 110,000 110,000
b. Pemasangan 1 set 5,503,600 5,503,600
JUMLAH Rp. 12,164,400
20 Pems.pembesian & isolator tumpu Tgl 20KV 3 PH UNP 10 3pl pd t.besi
a. Material Utama
Pin post insulator 20 KV 3 bh Material PLN
F Neck Plastic Top Ties Semicon A3C_S 150 mm2 3 bh 167,600 502,800
Travers dudukan fuse cut out/Arrester UNP 10 x 2000 mm 1 bh 1,054,400 1,054,400
Besi L panjang 700 mm, 50x50x5mm. 1 bh 193,800 193,800
Mur Baut 5/8" x 300 mm 0 bh 94,000 -
Mur Baut 1/2" x 50 mm 4 bh 17,000 68,000
double beugel khusus 1 bh 121,200 121,200
Beugel + mur baut 1 bh 142,800 142,800
Penghalang panjat 1 bh 220,000 220,000
Papan tanda kilat/ Tanda bahaya 1 bh 110,000 110,000
b. Pemasangan 1 set 4,032,000 4,032,000
JUMLAH Rp. 6,445,000
21 Pems.pembesian & isolator tumpu gd 20KV 3 PH UNP 10 3pl pd.t.besi
a. Material Utama
Pin post insulator 20 KV 6 bh Material PLN
F Neck Plastic Top Ties Semicon A3C_S 70 mm2 3 Set 158,800 476,400
Travers dudukan fuse cut out/Arrester UNP 10 x 2000 mm 2 bh 1,054,400 2,108,800
Besi L panjang 700 mm, 50x50x5mm. 2 bh 193,800 387,600
Bolt double arming 5/8" x350 mm 4 bh 67,000 268,000
Mur Baut 5/8" x 300 mm 0 bh 94,000 -
Mur Baut 1/2" x 50 mm 6 bh 17,000 102,000
double beugel khusus 1 bh 121,200 121,200
Penghalang panjat 1 bh 220,000 220,000
Papan tanda kilat/ Tanda bahaya 1 bh 110,000 110,000
Stainless Steel strap 2 mtr 34,600 69,200
Stopping Buckle Stainless Steel 2 bh 10,000 20,000
b. Pemasangan 1 set 7,887,600 7,887,600
JUMLAH Rp. 11,770,800
22 Pems.pembesian & isolator afspan tgl 20KV 3PH UNP 10 3pl pd t.besi
a. Material Utama
Isolator tarik 20 KV lengkap accessories type suspension 3 set Material PLN
Pin post insulator 20 KV 1 set Material PLN
Besi L panjang 700 mm, 50x50x5mm. 1 set 193,800 193,800
Compression tension joint AAAC 150 mm2 3 bh 200,000 600,000
Travers dudukan fuse cut out/Arrester UNP 10 x 2000 mm 1 bh 1,054,400 1,054,400
double beugel khusus 1 bh 121,200 121,200
Beugel + mur baut 1 bh 142,800 142,800
Mur Baut 5/8" x 300 mm 0 bh 94,000 -
Mur Baut 1/2" x 50 mm 4 bh 17,000 68,000
Penghalang panjat 1 bh 220,000 220,000
Papan tanda kilat/ Tanda bahaya 1 bh 110,000 110,000
Stainless Steel strap 2 mtr 34,600 69,200
Stopping Buckle Stainless Steel 2 bh 10,000 20,000
b. Pemasangan 1 set 1,222,800 1,222,800
JUMLAH Rp. 3,822,200
halaman : 7
HARGA PENAWARAN PER PAKET PEKERJAAN CLUSTER PROPINSI SULAWESI BARAT PT ..........
PERHITUNGAN BIAYA PEMBANGUNAN JTM, JTR DAN Gardu Distribusi JASKONHAR JTM JTR GD 2022
TIDAK TERMASUK HARGA MATERIAL DISTRIBUSI UTAMA (MDU)
VOLUME/PENGADAAN
HARGA PENAWARAN
(Rp) (Rp)
a b c d e f g
23 Pems.pembesian & isolator afspan gd 20KV 3PH UNP 10 3pl pd t.besi
a. Material Utama
Isolator tarik 20 KV lengkap accessories type suspension 6 set Material PLN
Pin post insulator 20 KV 1 bh Material PLN
F Neck Plastic Top Ties Semicon A3C_S 150 mm2 1 bh 167,600 167,600
Compression tension joint AAAC 150 mm2 3 bh 200,000 600,000
Travers dudukan fuse cut out/Arrester UNP 10 x 2000 mm 2 bh 1,054,400 2,108,800
Besi L panjang 700 mm, 50x50x5mm. 2 bh 193,800 387,600
Bolt double arming 5/8" x350 mm 4 bh 67,000 268,000
double beugel khusus 1 set 121,200 121,200
Mur Baut 5/8" x 300 mm 0 bh 94,000 -
Mur Baut 1/2" x 50 mm 6 bh 17,000 102,000
Bolt double arming 5/8" x50 mm 0 bh 27,200 -
Penghalang panjat 1 bh 220,000 220,000
Papan tanda kilat/ Tanda bahaya 1 bh 110,000 110,000
Stainless Steel strap 2 mtr 34,600 69,200
Stopping Buckle Stainless Steel 2 bh 10,000 20,000
b. Pemasangan 1 set 3,207,200 3,207,200
JUMLAH Rp. 7,381,600
24 Pems.pembesian & isolator afspan gd 20KV 3PH UNP 10 t.ujung t.besi
a. Material Utama
Isolator tarik 20 KV lengkap accessories type suspension 3 set Material PLN
Pin post insulator 20 KV 0 bh Material PLN
F Neck Plastic Top Ties Semicon A3C_S 150 mm2 0 bh 167,600 -
Compression tension joint AAAC 150 mm2 0 bh 200,000 -
Travers dudukan fuse cut out/Arrester UNP 10 x 2000 mm 2 bh 1,054,400 2,108,800
Besi L panjang 700 mm, 50x50x5mm. 2 bh 193,800 387,600
Bolt double arming 5/8" x350 mm 4 bh 67,000 268,000
double beugel khusus 1 bh 121,200 121,200
Mur Baut 5/8" x 300 mm 0 bh 94,000 -
Mur Baut 1/2" x 50 mm 6 bh 17,000 102,000
Penghalang panjat 1 bh 220,000 220,000
Papan tanda kilat/ Tanda bahaya 1 bh 110,000 110,000
Stainless Steel strap 2 mtr 34,600 69,200
Stopping Buckle Stainless Steel 2 bh 10,000 20,000
b. Pemasangan 1 set 1,602,000 1,602,000
JUMLAH Rp. 5,008,800
25 Pems.pembesian & isolator afspan gd (60° - 90°/AU2x) 20KV 3PH UNP 10 t.ujung t.besi
a. Material Utama
Isolator tarik 20 KV lengkap accessories type suspension 6 set Material PLN
Pin post insulator 20 KV 2 bh Material PLN
F Neck Plastic Top Ties Semicon A3C_S 70 mm2 2 bh 158,800 317,600
Compression tension joint AAAC 70 mm2 3 bh 120,800 362,400
Travers dudukan fuse cut out/Arrester UNP 10 x 2000 mm 4 bh 1,054,400 4,217,600
Besi L panjang 700 mm, 50x50x5mm. 4 bh 193,800 775,200
Bolt double arming 5/8" x350 mm 4 bh 67,000 268,000
double beugel khusus 2 bh 121,200 242,400
Mur Baut 5/8" x 250 mm 0 bh 83,400 -
Mur Baut 1/2" x 50 mm 12 bh 17,000 204,000
Penghalang panjat 1 bh 220,000 220,000
Papan tanda kilat/ Tanda bahaya 1 bh 110,000 110,000
Stainless Steel strap 2 mtr 34,600 69,200
Stopping Buckle Stainless Steel 2 bh 10,000 20,000
b. Pemasangan 1 set 5,503,600 5,503,600
JUMLAH Rp. 12,310,000
26 Pems.pembesian & isolator afspan gd 20KV 3PH UNP 10 Tipe H t. besi
a. Material Utama
Isolator tarik 20 KV lengkap accessories type suspension 6 set Material PLN
Pin post insulator 20 KV 2 bh Material PLN
F Neck Plastic Top Ties Semicon A3C_S 70 mm2 2 bh 158,800 317,600
Compression tension joint AAAC 70 mm2 3 bh 120,800 362,400
Travers dudukan fuse cut out/Arrester UNP 10 x 2400 mm 2 bh 1,352,200 2,704,400
Besi L panjang 700 mm, 50x50x5mm. 4 bh 193,800 775,200
Bolt double arming 5/8" x350 mm 5 bh 67,000 335,000
Bolt double arming 5/8" x50 mm 0 bh 27,200 -
Mur Baut 5/8" x 250 mm 0 bh 83,400 -
Mur Baut 1/2" x 50 mm 12 bh 17,000 204,000
double beugel khusus 2 bh 121,200 242,400
Penghalang panjat 2 bh 220,000 440,000
Papan tanda kilat/ Tanda bahaya 2 bh 110,000 220,000
Stainless Steel strap 3 mtr 34,600 103,800
Stopping Buckle Stainless Steel 4 bh 10,000 40,000
b. Pemasangan 1 set 4,921,600 4,921,600
JUMLAH Rp. 10,666,400
27 Pems.pembesian & isolator tumpu Tgl 20KV 3 PH Consul UNP 10 3pl pd t.besi
a. Material Utama
Pin post insulator 20 KV 3 bh Material PLN
F Neck Plastic Top Ties Semicon A3C_S 70 mm2 3 bh 158,800 476,400
Travers dudukan fuse cut out/Arrester UNP 10 x 2000 mm 1 bh 1,054,400 1,054,400
Travers dudukan fuse cut out/Arrester UNP 10 x 2400 mm 2 bh 1,352,200 2,704,400
halaman : 8
HARGA PENAWARAN PER PAKET PEKERJAAN CLUSTER PROPINSI SULAWESI BARAT PT ..........
PERHITUNGAN BIAYA PEMBANGUNAN JTM, JTR DAN Gardu Distribusi JASKONHAR JTM JTR GD 2022
TIDAK TERMASUK HARGA MATERIAL DISTRIBUSI UTAMA (MDU)
VOLUME/PENGADAAN
HARGA PENAWARAN
(Rp) (Rp)
a b c d e f g
Besi L panjang 700 mm, 50x50x5mm. 1 bh 193,800 193,800
Mur Baut 1/2" x 50 mm 10 bh 17,000 170,000
double beugel khusus 2 bh 121,200 242,400
Beugel + mur baut 0 bh 142,800 -
Penghalang panjat 1 bh 220,000 220,000
Papan tanda kilat/ Tanda bahaya 1 bh 110,000 110,000
Stainless Steel strap 2 mtr 34,600 69,200
Stopping Buckle Stainless Steel 2 bh 10,000 20,000
b. Pemasangan 1 set 5,043,200 5,043,200
JUMLAH Rp. 10,303,800
28 Pems.pembesian & isolator tumpu gd 20KV 3 PH Consul UNP 10 3pl pd.t.besi
a. Material Utama
Pin post insulator 20 KV 6 bh Material PLN
F Neck Plastic Top Ties Semicon A3C_S 70 mm2 3 Set 158,800 476,400
Travers dudukan fuse cut out/Arrester UNP 10 x 2000 mm 2 bh 1,054,400 2,108,800
Travers dudukan fuse cut out/Arrester UNP 10 x 2400 mm 2 bh 1,352,200 2,704,400
Besi L panjang 700 mm, 50x50x5mm. 2 bh 193,800 387,600
Bolt double arming 5/8" x350 mm 5 bh 67,000 335,000
Mur Baut 1/2" x 50 mm 12 bh 17,000 204,000
double beugel khusus 2 bh 121,200 242,400
Penghalang panjat 1 bh 220,000 220,000
Papan tanda kilat/ Tanda bahaya 1 bh 110,000 110,000
Stainless Steel strap 2 mtr 34,600 69,200
Stopping Buckle Stainless Steel 2 bh 10,000 20,000
b. Pemasangan 1 set 8,898,800 8,898,800
JUMLAH Rp. 15,776,600
29 Pems.pembesian & isolator aspan gd 20KV 3 PH Consul UNP 10 3pl pd t.besi
a. Material Utama
Isolator tarik 20 KV lengkap accessories type suspension 6 set Material PLN
Pin post insulator 20 KV 1 bh Material PLN
F Neck Plastic Top Ties Semicon A3C_S 70 mm2 1 bh 158,800 158,800
Compression tension joint AAAC 70 mm2 3 bh 120,800 362,400
Travers dudukan fuse cut out/Arrester UNP 10 x 2000 mm 2 bh 1,054,400 2,108,800
Travers dudukan fuse cut out/Arrester UNP 10 x 2400 mm 2 bh 1,352,200 2,704,400
Bolt double arming 5/8" x350 mm 5 bh 67,000 335,000
Besi L panjang 700 mm, 50x50x5mm. 2 bh 193,800 387,600
Mur Baut 1/2" x 50 mm 12 bh 17,000 204,000
double beugel khusus 1 bh 121,200 121,200
Penghalang panjat 1 bh 220,000 220,000
Papan tanda kilat/ Tanda bahaya 2 mtr 110,000 220,000
Stainless Steel strap 2 bh 34,600 69,200
Stopping Buckle Stainless Steel 2 set 10,000 20,000
b. Pemasangan 1 set 4,597,600 4,597,600
JUMLAH Rp. 11,509,000
30 Pems.pembesian & isolator aspan Gd 20KV 3 PH Consul UNP 10 3pl t.ujung pd t.besi
a. Material Utama
Isolator tarik 20 KV lengkap accessories type suspension 3 set Material PLN
Travers dudukan fuse cut out/Arrester UNP 10 x 2000 mm 2 bh 1,054,400 2,108,800
Travers dudukan fuse cut out/Arrester UNP 10 x 2400 mm 2 bh 1,352,200 2,704,400
Bolt double arming 5/8" x350 mm 5 bh 67,000 335,000
Besi L panjang 700 mm, 50x50x5mm. 2 bh 193,800 387,600
Mur Baut 1/2" x 50 mm 12 bh 17,000 204,000
double beugel khusus 1 bh 121,200 121,200
Penghalang panjat 1 bh 220,000 220,000
Papan tanda kilat/ Tanda bahaya 2 mtr 110,000 220,000
Stainless Steel strap 2 bh 34,600 69,200
Stopping Buckle Stainless Steel 2 set 10,000 20,000
b. Pemasangan 1 set 2,613,200 2,613,200
JUMLAH Rp. 9,003,400
31 Pems.pembesian & isolator aspan gd (60° - 90°/AU2x) 20KV 3 PH Consul UNP 10 3pl t. ujung pd t.btn
a. Material Utama
Isolator tarik 20 KV lengkap accessories type suspension 6 set Material PLN
Pin post insulator 20 KV 2 bh Material PLN
F Neck Plastic Top Ties Semicon A3C_S 70 mm2 2 bh 158,800 317,600
Compression tension joint AAAC 70 mm2 3 bh 120,800 362,400
Travers dudukan fuse cut out/Arrester UNP 10 x 2000 mm 4 bh 1,054,400 4,217,600
Travers dudukan fuse cut out/Arrester UNP 10 x 2400 mm 2 bh 1,352,200 2,704,400
Bolt double arming 5/8" x350 mm 8 bh 67,000 536,000
Besi L panjang 700 mm, 50x50x5mm. 4 bh 193,800 775,200
Mur Baut 1/2" x 50 mm 16 bh 17,000 272,000
double beugel khusus 1 bh 121,200 121,200
Penghalang panjat 1 bh 220,000 220,000
Papan tanda kilat/ Tanda bahaya 2 mtr 110,000 220,000
Stainless Steel strap 2 bh 34,600 69,200
Stopping Buckle Stainless Steel 2 set 10,000 20,000
b. Pemasangan 1 set 5,468,400 5,468,400
JUMLAH Rp. 15,304,000
halaman : 9
HARGA PENAWARAN PER PAKET PEKERJAAN CLUSTER PROPINSI SULAWESI BARAT PT ..........
PERHITUNGAN BIAYA PEMBANGUNAN JTM, JTR DAN Gardu Distribusi JASKONHAR JTM JTR GD 2022
TIDAK TERMASUK HARGA MATERIAL DISTRIBUSI UTAMA (MDU)
VOLUME/PENGADAAN
HARGA PENAWARAN
(Rp) (Rp)
a b c d e f g
32 Pemancangan tiang besi 11 meter
a. Material Utama
- Tiang besi 11 meter 1 btg Material PLN
b. Pemasangan
- Penggalian tanah untuk pemancagan tiang TM (tanah) 1 lbg 328,000 328,000
- Penggonian tiang 11 1 btg 466,600 466,600
- Pemancangan tiang besi 11-14 meter 1 btg 516,200 516,200
- Pembetonan selubung tiang besi 9-11 mm 1 btg - -
- Pengecatan tiang besi TM + Material 1 btg 17,600 17,600
JUMLAH Rp. 1,328,400
33 Pemancangan tiang besi 11 meter
a. Material Utama
- Tiang besi 11 meter 1 btg Material PLN
b. Pemasangan
- Galian/pembuatan lubang ( Tanah Berbatu ) 1 lbg 739,200 739,200
- Memantel tiang (penggonian + selubung beton type C) + bahan 1 btg 2,597,400 2,597,400
- Pemancangan dan pengecatan + bahan 1 btg 516,200 516,200
JUMLAH Rp. 3,852,800
34 Pemancangan tiang besi 12 meter
a. Material Utama
- Tiang besi 12 meter 1 btg Material PLN
b. Pemasangan
- Galian/pembuatan lubang 1 lbg 328,000 328,000
- Memantel tiang (penggonian + selubung beton type C) + bahan 1 btg 2,617,800 2,617,800
- Pemancangan dan pengecatan + bahan 1 btg 516,200 516,200
JUMLAH Rp. 3,462,000
35 Pemancangan tiang besi 12 meter
a. Material Utama
- Tiang besi 12 meter 1 btg Material PLN
b. Pemasangan
- Galian/pembuatan lubang ( Tanah Berbatu ) 1 lbg 739,200 739,200
- Memantel tiang (penggonian + selubung beton type C) + bahan 1 btg 2,597,400 2,597,400
- Pemancangan dan pengecatan + bahan 1 btg 516,200 516,200
JUMLAH Rp. 3,852,800
36 Pemancangan tiang besi 13 meter
a. Material Utama
- Tiang besi 13 meter 1 btg Material PLN
b. Pemasangan
- Galian/pembuatan lubang 1 lbg 328,000 328,000
- Memantel tiang (penggonian + selubung beton type C) + bahan 1 btg 2,617,800 2,617,800
- Pemancangan dan pengecatan + bahan 1 btg 516,200 516,200
JUMLAH Rp. 3,462,000
37 Pemancangan tiang besi 13 meter
a. Material Utama
- Tiang besi 13 meter 1 btg Material PLN
b. Pemasangan
- Galian/pembuatan lubang ( Tanah Berbatu ) 1 lbg 739,200 739,200
- Memantel tiang (penggonian + selubung beton type C) + bahan 1 btg 2,597,400 2,597,400
- Pemancangan dan pengecatan + bahan 1 btg 516,200 516,200
JUMLAH Rp. 3,852,800
38 Pemancangan tiang besi 9 meter
a. Material Utama
- Tiang besi 9 meter 1 btg Material PLN
b. Pemasangan
- Galian/pembuatan lubang 1 lbg 272,600 272,600
- Memantel tiang (penggonian + selubung beton type C) + bahan 1 btg 7,182,000 7,182,000
- Pemancangan dan pengecatan + bahan 1 btg 976,400 976,400
JUMLAH Rp. 8,431,000
39 Pemancangan tiang besi 9 meter
a. Material Utama
- Tiang besi 9 meter 1 btg Material PLN
b. Pemasangan
- Galian/pembuatan lubang ( Tanah Berbatu ) 1 lbg 739,200 739,200
- Memantel tiang (penggonian + selubung beton type C) + bahan 1 btg 7,182,000 7,182,000
- Pemancangan dan pengecatan + bahan 1 btg 976,400 976,400
JUMLAH Rp. 8,897,600
40 Pemasangan tupang tarik tiang beton.
a. Material Utama
Guy Insulator 12 kV 1 bh 119,400 119,400
Double beugel + Mur Baut Mata + Eye Bolt 1 set 184,200 184,200
Turn Buckle Medium /Span scroef 5/8" 1 bh 95,800 95,800
Plat beton bertulang 40x40x10 cm 1 bh 110,200 110,200
Angker rod + klem penyambung + mur baut 1 bh 143,800 143,800
U - klem 35 - 50 mm 8 bh 17,600 140,800
Kaos baja / Thimble TM 5/8" 2 bh 34,600 69,200
Galvanized Steel Wire 35 mm2 15 mtr 24,400 366,000
b. Pemasangan 1 set 706,600 706,600
JUMLAH Rp. 1,936,000
halaman : 10
HARGA PENAWARAN PER PAKET PEKERJAAN CLUSTER PROPINSI SULAWESI BARAT PT ..........
PERHITUNGAN BIAYA PEMBANGUNAN JTM, JTR DAN Gardu Distribusi JASKONHAR JTM JTR GD 2022
TIDAK TERMASUK HARGA MATERIAL DISTRIBUSI UTAMA (MDU)
VOLUME/PENGADAAN
HARGA PENAWARAN
(Rp) (Rp)
a b c d e f g
41 Pemasangan tupang tarik tiang besi.
a. Material Utama
Guy Insulator 12 kV 1 bh 119,400 119,400
Double beugel + Mur Baut Mata + Eye Bolt 1 set 184,200 184,200
Turn Buckle Medium /Span scroef 5/8" 1 bh 95,800 95,800
Plat beton bertulang 40x40x10 cm 1 bh 110,200 110,200
Angker rod + klem penyambung + mur baut 1 bh 143,800 143,800
U - klem 35 - 50 mm 8 bh 17,600 140,800
Kaos baja / Thimble TM 5/8" 2 bh 34,600 69,200
Galvanized Steel Wire 35 mm2 15 mtr 24,400 366,000
b. Pemasangan 1 set 706,600 706,600
JUMLAH Rp. 1,936,000
42 Pemasangan tupang tarik khusus
a. Material Utama
Guy Insulator 12 kV 1 bh 119,400 119,400
Double beugel + Mur Baut Mata + Eye Bolt 1 set 184,200 184,200
Turn Buckle Medium /Span scroef 5/8" 1 bh 95,800 95,800
Plat beton bertulang 40x40x10 cm 1 bh 110,200 110,200
Angker rod + klem penyambung + mur baut 1 bh 143,800 143,800
U - klem 35 - 50 mm 8 bh 17,600 140,800
Kaos baja / Thimble TM 5/8" 2 bh 34,600 69,200
Galvanized Steel Wire 35 mm2 25 mtr 24,400 610,000
b. Pemasangan 1 set 706,600 706,600
JUMLAH Rp. 2,180,000
43 Pemasangan tupang tarik Kontra Mast
a. Material Utama
Guy Insulator 12 kV 1 bh 119,400 119,400
Double beugel + Mur Baut Mata + Eye Bolt 1 set 184,200 184,200
Turn Buckle Medium /Span scroef 5/8" 1 bh 95,800 95,800
Plat beton bertulang 40x40x10 cm 1 bh 110,200 110,200
Angker rod + klem penyambung + mur baut 1 bh 143,800 143,800
U - klem 35 - 50 mm 12 bh 17,600 211,200
Kaos baja / Thimble TM 5/8" 4 bh 34,600 138,400
Galvanized Steel Wire 35 mm2 15 mtr 24,400 366,000
Besi L panjang 700 mm, 50x50x5mm. 1 bh 193,800 193,800
double beugel khusus 1 bh 121,200 121,200
Mur Baut 1/2" x 50 mm 4 bh 17,000 68,000
b. Pemasangan 1 set 706,600 706,600
JUMLAH Rp. 2,458,600
44 Pemasangan tupang tarik dengan tiang bantu tiang beton.
a. Material Utama
Tiang beton 1 btg Material PLN
Guy Insulator 12 kV 1 bh 119,400 119,400
Double beugel + Mur Baut Mata + Eye Bolt 3 set 184,200 552,600
Turn Buckle Medium /Span scroef 5/8" 1 bh 95,800 95,800
Plat beton bertulang 40x40x10 cm 1 set 110,200 110,200
Angker rod + klem penyambung + mur baut 1 bh 143,800 143,800
U - klem 35 - 50 mm 12 bh 17,600 211,200
Kaos baja / Thimble TM 5/8" 4 bh 34,600 138,400
Galvanized Steel Wire 35 mm2 25 mtr 24,400 610,000
b. Pemasangan 1 set 1,953,600 1,953,600
JUMLAH Rp. 3,935,000
45 Pemasangan tupang tarik dengan tiang bantu tiang besi.
a. Material Utama
Tiang besi 9 meter 1 btg Material PLN
Guy Insulator 12 kV 1 bh 119,400 119,400
Double beugel + Mur Baut Mata + Eye Bolt 3 set 184,200 552,600
Turn Buckle Medium /Span scroef 5/8" 1 bh 95,800 95,800
Plat beton bertulang 40x40x10 cm 1 set 110,200 110,200
Angker rod + klem penyambung + mur baut 1 bh 143,800 143,800
U - klem 35 - 50 mm 12 bh 17,600 211,200
Kaos baja / Thimble TM 5/8" 4 bh 34,600 138,400
Galvanized Steel Wire 35 mm2 25 mtr 24,400 610,000
b. Pemasangan
Pemasangan Tupang tarik pada tiang bantu 1 set 1,953,600 1,953,600
Penggalian tanah untuk pemancagan tiang TM (tanah) 1 lbg 328,000 328,000
Pembetonan Tiang 12/200 Type C + Material 1 btg 2,151,200 2,151,200
Pengecatan tiang besi TM + Material 1 set 17,600 17,600
JUMLAH Rp. 6,431,800
46 Pemasangan tupang tekan
a. Material Utama
Tiang besi 11 meter 1 btg Material PLN
Double beugel / Clam Beugel 2 set 133,000 266,000
Beugel + mur baut 1 set 142,800 142,800
Sangga tupang tekan 1 bh 162,200 162,200
Plat beton bertulang 40x40x10 cm 1 bh 110,200 110,200
b. Pemasangan
Pemasangan Tupang tekan 1 lbg 1,394,000 1,394,000
Penggalian tanah untuk pemancagan tiang TM (tanah) 1 lbg 328,000 328,000
Pembetonan Tiang 12/200 Type C + Material 1 btg 2,151,200 2,151,200
Pengecatan tiang besi TM + Material 1 set 17,600 17,600
JUMLAH Rp. 4,572,000
halaman : 11
HARGA PENAWARAN PER PAKET PEKERJAAN CLUSTER PROPINSI SULAWESI BARAT PT ..........
PERHITUNGAN BIAYA PEMBANGUNAN JTM, JTR DAN Gardu Distribusi JASKONHAR JTM JTR GD 2022
TIDAK TERMASUK HARGA MATERIAL DISTRIBUSI UTAMA (MDU)
VOLUME/PENGADAAN
HARGA PENAWARAN
(Rp) (Rp)
a b c d e f g
47 Pemasangan LBS/Recloser
a. Material Utama
Recloser 20kV 1 set Material PLN
LBS Motorized + RTU 1 set Material PLN
Conductor AAAC-S;70mm2 31 set Material PLN
Conductor AAAC-S;150mm2 18 set Material PLN
Isolator Aspan;24kV;70kN 6 set Material PLN
LA Polymer SIR, 24 kV, 10 kA 6 set Material PLN
Fuse Cut Out, 24 Kv 2 set Material PLN
b. Pemasangan
Pemasangan LBS Motorized, recloser, FAI, PMCB ( lengkap assesories ) 1 set 11,577,600 11,577,600
JUMLAH Rp. 28,878,200
48 Pembongkaran LBS/Recloser
a. Pembongkaran
Pembongkaran LBS Motorized, recloser, FAI, PMCB ( lengkap assesories ) 1 set 1,279,906 2,582,600
Pembongkaran RTU 1 set 208,383 353,000
JUMLAH Rp. 2,935,600
B GARDU DISTRIBUSI
1 Pembangunan gardu tiang 1 phasa 20 kV (1 tiang).
a. Material Utama
Tiang 1 btg Material PLN
Trafo 1 phasa 25 kVA 20 kV 400/ 230 Volt 1 bh Material PLN
b. Konstruksi dudukan trafo 1 phasa
Kawat BC draad 50 mm² 25 mtr 138,200 3,455,000
Kawat AAAC/S 70 mm² 8 mtr Material PLN
Terminal lugs /Sepatu Cable Cu 50 mm² 6 bh 113,000 678,000
Terminal lugs /Sepatu Cable Bimetal (Al/Cu) 70 mm² 10 bh 147,800 1,478,000
Compression connector AL 70 - 150 mm2 ( CCO ) 2 bh 50,200 100,400
Dudukan gardu tiang 1 phasa cantol 1 set 2,619,400 2,619,400
Fuse cut out 20 kV 100 Amp + fuse link 3 Amp. 2 unit Material PLN
Fuselink 3A 2 bh - -
Pole mounthing brecket for FCO. 2 set Material PLN
24 kV lightning arrester 10 kA. 2 bh Material PLN
Pole mounthing brecket for LA. 2 set Material PLN
Travers dudukan fuse cut out/Arrester UNP 10 x 1.200 mm 2 bh 594,800 1,189,600
Beugel + mur baut 2 set 142,800 285,600
Mur Baut 5/8" x 250 mm 4 bh 83,400 333,600
Papan tanda kilat/ Tanda bahaya 1 bh 110,000 110,000
Ground Rod + Clamp 5/8" x 2 mtr 3 set 337,800 1,013,400
Unimax clamp 50 mm² / split bolt line tap for B27 3 bh 65,200 195,600
Tekep Isolator FCO bagian atas (untuk 1 phasa) 2 bh - -
Tekep Isolator FCO bagian bawah (untuk 1 phasa) 2 bh - -
Tekep Isolator Arester (untuk 1 phasa) 2 bh - -
Tekep Isolator Bushing TM dan TR Trafo (untuk 1 phasa) 2 bh - -
Tekep Isolator Bushing TM dan TR Trafo (untuk 1 phasa) 4 bh - -
c. Lemari bagi TR 1 phasa lengkap
Kotak lemari bagi 1 phasa 2 jurusan lengkap 1 tiang 1 set Material PLN
Rel tembaga 40 x 5 mm = 0.75
Dudukan rel tembaga = 6,00
NT fuse zise 1, 100 amp. = 4,00
Fuse base 250 Amp = 4,00
Lampu kontrol * MCB 2 Amp = 1 bh
* Bola lampu 40 W = 1 bh
* Stop kontak arde = 1 bh
* Saklar engkel outbow = 1 bh
halaman : 12
HARGA PENAWARAN PER PAKET PEKERJAAN CLUSTER PROPINSI SULAWESI BARAT PT ..........
PERHITUNGAN BIAYA PEMBANGUNAN JTM, JTR DAN Gardu Distribusi JASKONHAR JTM JTR GD 2022
TIDAK TERMASUK HARGA MATERIAL DISTRIBUSI UTAMA (MDU)
VOLUME/PENGADAAN
HARGA PENAWARAN
(Rp) (Rp)
a b c d e f g
* Kabel NYAF 1 x 2,5 mm = 3 mtr
Travers dudukan PHB TR 3 phasa lengkap (UNP 6,5 x 600 mm) 2 set 389,200 778,400
Beugel + mur baut 2 set 142,800 285,600
d. Pemasangan
Konstruksi gardu tiang 1 phasa (konstruksi dudukan trafo, cut out, lightning
1 set 5,427,400 5,427,400
arrester, pentanahan, lemari bagi, trafo).
i. Jasa Pemasangan :
Konstruksi gardu tiang 3 phasa (konstruksi dudukan trafo, cut out, lightning
1 set 10,334,000 10,334,000
arrester, pentanahan, lemari bagi, trafo)
JUMLAH Rp. 37,415,200
2 Pembangunan gardu tiang 3 phasa 20 kV (1 tiang) 100 kVA
a. Material Utama
TRF DIS;;20kV/400V;3P;100kVA;YZN5;OD 1 Material PLN
CUT OUT;20kV;6-100A;10kA;125kV 3 Material PLN
LA;20-24kV;K;10kA;;; 3 Material PLN
CABLE PWR;NYY;1X70mm2;0.6/1kV;OH 64 Material PLN
CABLE PWR;NYY;1X95mm2;0.6/1kV;OH 36 Material PLN
LVSB;DIST;3P;380V;250A;2LINE;OD 1 Material PLN
b. Konstruksi Dudukan FCO dan Arrester
Travers dudukan fuse cut out/Arrester UNP 10 x 2000 mm 2 Buah 1,054,400 2,108,800
Beugel + mur baut 2 Buah 142,800 285,600
Besi L panjang 700 mm, 50x50x5mm. 2 Buah 193,800 387,600
Double beugel khusus 2 Set 121,200 242,400
Mur Baut 5/8" x 50 mm 8 Buah 33,200 265,600
Penghalang panjat 1 Buah 220,000 220,000
Papan tanda kilat/ Tanda bahaya 1 Buah 110,000 110,000
c. Konstruksi Dudukan Trafo
Dudukan gardu tiang 3 phasa cantol 1 Set 4,283,800 4,283,800
Tanda bahaya di gardu 1 Buah 118,000 118,000
d. Konstruksi Dudukan PHBTR
Travers dudukan PHB TR 3 phasa lengkap (UNP 6,5 x 750 mm) 2 Buah 431,000 862,000
e. Konstruksi Pipa Kabel Opstyg
Pipa galvanized 3" x 6.000 mm medium B 3 Buah 813,800 2,441,400
halaman : 13
HARGA PENAWARAN PER PAKET PEKERJAAN CLUSTER PROPINSI SULAWESI BARAT PT ..........
PERHITUNGAN BIAYA PEMBANGUNAN JTM, JTR DAN Gardu Distribusi JASKONHAR JTM JTR GD 2022
TIDAK TERMASUK HARGA MATERIAL DISTRIBUSI UTAMA (MDU)
VOLUME/PENGADAAN
HARGA PENAWARAN
(Rp) (Rp)
a b c d e f g
Knee galvanized 3" 6 Buah 121,800 730,800
Beugel + mur baut pengikat pipa 3" + mur baut 6 Set 180,000 1,080,000
f. Konstruksi Kabel Jumper
Compression connector AL 70 - 150 mm2 ( CCO ) 3 Buah 50,200 150,600
Terminal lugs /Sepatu Cable Bimetal (Al/Cu) 70 mm² 15 Buah 147,800 2,217,000
Heatshrink / Isolasi Bakar Hitam/warna 70mm 15 Buah 55,400 831,000
Fuselink 8A 3 Buah - -
g. Konstruksi Kabel Opstyg
Terminal lugs /Sepatu Cable Cu 95 mm² 8 Buah 170,000 1,360,000
Heatshrink / Isolasi Bakar Hitam/warna 150mm 8 Buah 83,200 665,600
Terminal lugs /Sepatu Cable Cu 70 mm² 2 Buah 126,400 252,800
Heatshrink / Isolasi Bakar Hitam/warna 70mm 2 Buah 55,400 110,800
Bimetal compression joint ( AL / CU ) + Heatshrink 70 - 70 mm2 8 Buah 157,600 1,260,800
Plastic Strap For JTR (20 Cm) 4 Buah 4,800 19,200
h. Konstruksi Pentanahan
Terminal lugs /Sepatu Cable Cu 50 mm² 12 Buah 113,000 1,356,000
Ground Rod + Clamp 5/8 x 2,5 mtr 4 Set 394,000 1,576,000
Kawat BC draad 50 mm² 25 Meter 138,200 3,455,000
Pipa galvanized 1" x 3.000 mm medium B 2 Buah 154,000 308,000
Pipa galvanized 1" x 1.000 mm medium B 2 Buah 55,800 111,600
Stainless Steel Strap 6 Meter 34,600 207,600
Stopping Buckle 6 Buah 6,400 38,400
Link 25 x 25 mm 4 Buah 6,200 24,800
Tekep Isolator FCO bagian atas (untuk 1 phasa) 3 Set - -
Tekep Isolator FCO bagian bawah (untuk 1 phasa) 3 Set - -
Tekep Isolator Bushing TM dan TR Trafo (untuk 1 phasa) 7 Set - -
Tekep Isolator Arester (untuk 1 phasa) 3 Set - -
i. Jasa Pemasangan -
Konstruksi gardu tiang 3 phasa (konstruksi dudukan trafo, cut out, lightning
1 set 10,434,600 10,434,600
arrester, pentanahan, lemari bagi, trafo)
i. Jasa Pemasangan -
Konstruksi gardu tiang 3 phasa (konstruksi dudukan trafo, cut out, lightning
1 set 12,014,400 12,014,400
arrester, pentanahan, lemari bagi, trafo)
halaman : 14
HARGA PENAWARAN PER PAKET PEKERJAAN CLUSTER PROPINSI SULAWESI BARAT PT ..........
PERHITUNGAN BIAYA PEMBANGUNAN JTM, JTR DAN Gardu Distribusi JASKONHAR JTM JTR GD 2022
TIDAK TERMASUK HARGA MATERIAL DISTRIBUSI UTAMA (MDU)
VOLUME/PENGADAAN
HARGA PENAWARAN
(Rp) (Rp)
a b c d e f g
JUMLAH Rp. 46,405,800
halaman : 15
HARGA PENAWARAN PER PAKET PEKERJAAN CLUSTER PROPINSI SULAWESI BARAT PT ..........
PERHITUNGAN BIAYA PEMBANGUNAN JTM, JTR DAN Gardu Distribusi JASKONHAR JTM JTR GD 2022
TIDAK TERMASUK HARGA MATERIAL DISTRIBUSI UTAMA (MDU)
VOLUME/PENGADAAN
HARGA PENAWARAN
(Rp) (Rp)
a b c d e f g
3 Pembangunan gardu tiang 3 phasa 20 kV (2 tiang) 100 - 160 kVA
a. Material Utama
TRF DIS;;20kV/400V;3P;100-160kVA;YZN5;OD 1 Material PLN
CUT OUT;20kV;6-100A;10kA;125kV 3 Material PLN
LA;20-24kV;K;10kA;;; 3 Material PLN
CABLE PWR;NYY;1X70mm2;0.6/1kV;OH 64 Material PLN
CABLE PWR;NYY;1X150mm2;0.6/1kV;OH 36 Material PLN
LVSB;DIST;3P;380V;250A;2LINE;OD 1 Material PLN
b. Konstruksi Dudukan FCO dan Arrester
Travers dudukan fuse cut out/Arrester UNP 10 x 2400 mm 2 Buah 1,352,200 2,704,400
Beugel + mur baut 8 Buah 142,800 1,142,400
Penghalang panjat 2 Buah 220,000 440,000
Papan tanda kilat/ Tanda bahaya 2 Buah 110,000 220,000
c. Konstruksi Dudukan Trafo
Dudukan gardu tiang 3 phasa portal 1 Set 8,120,400 8,120,400
Double beugel / Clam Beugel 2 Set 133,000 266,000
Turn Buckle Medium /Span scroef 5/8" 2 Buah 95,800 191,600
Plat Bordes 2320x600x min1,6 mm 1 Buah 840,400 840,400
Tanda bahaya di gardu 1 Buah 118,000 118,000
d. Konstruksi Dudukan PHBTR
Travers dudukan PHB TR 3 phasa lengkap (UNP 6,5 x 2400 mm) 2 Buah 800,000 1,600,000
e. Konstruksi Pipa Kabel Opstyg
Pipa galvanized 3" x 6.000 mm medium B 3 Buah 813,800 2,441,400
Pipa galvanized 3" x 1.000 mm medium B 3 Buah 183,600 550,800
Knee galvanized 3" 6 Buah 121,800 730,800
Beugel + mur baut pengikat pipa 3" + mur baut 6 Set 180,000 1,080,000
f. Konstruksi Kabel Jumper
Compression connector AL 70 - 150 mm2 ( CCO ) 3 Buah 50,200 150,600
Terminal lugs /Sepatu Cable Bimetal (Al/Cu) 70 mm² 15 Buah 147,800 2,217,000
Heatshrink / Isolasi Bakar Hitam/warna 70mm 15 Buah 55,400 831,000
Fuselink 8A 3 Buah - -
g. Konstruksi Kabel Opstyg
Terminal lugs /Sepatu Cable Cu 150 mm² 8 Buah 259,800 2,078,400
Heatshrink / Isolasi Bakar Hitam/warna 150mm 8 Buah 83,200 665,600
Terminal lugs /Sepatu Cable Cu 70 mm² 2 Buah 126,400 252,800
Heatshrink / Isolasi Bakar Hitam/warna 70mm 2 Buah 55,400 110,800
Bimetal compression joint ( AL / CU ) + Heatshrink 70 - 70 mm2 8 Buah 157,600 1,260,800
Plastic Strap For JTR (20 Cm) 4 Buah 4,800 19,200
h. Konstruksi Pentanahan
Terminal lugs /Sepatu Cable Cu 50 mm² 12 Buah 113,000 1,356,000
Ground Rod + Clamp 5/8 x 2,5 mtr 4 Set 394,000 1,576,000
Kawat BC draad 50 mm² 25 Meter 138,200 3,455,000
Pipa galvanized 1" x 3.000 mm medium B 2 Buah 154,000 308,000
Pipa galvanized 1" x 1.000 mm medium B 2 Buah 55,800 111,600
Stainless Steel Strap 6 Meter 34,600 207,600
Stopping Buckle 6 Buah 6,400 38,400
Link 25 x 25 mm 4 Buah 6,200 24,800
i. Konstruksi Cover FCO, Arrester, dan Bushing Trafo
Tekep Isolator FCO bagian atas (untuk 1 phasa) 3 Set - -
Tekep Isolator FCO bagian bawah (untuk 1 phasa) 3 Set - -
Tekep Isolator Bushing TM dan TR Trafo (untuk 1 phasa) 7 Set - -
Tekep Isolator Arester (untuk 1 phasa) 3 Set - -
j. Jasa Pemasangan
Konstruksi gardu tiang 3 phasa (konstruksi dudukan trafo, cut out, lightning
1 set 12,115,000 12,115,000
arrester, pentanahan, lemari bagi, trafo)
halaman : 16
HARGA PENAWARAN PER PAKET PEKERJAAN CLUSTER PROPINSI SULAWESI BARAT PT ..........
PERHITUNGAN BIAYA PEMBANGUNAN JTM, JTR DAN Gardu Distribusi JASKONHAR JTM JTR GD 2022
TIDAK TERMASUK HARGA MATERIAL DISTRIBUSI UTAMA (MDU)
VOLUME/PENGADAAN
HARGA PENAWARAN
(Rp) (Rp)
a b c d e f g
Fuselink 8A 3 Buah - -
g. Konstruksi Kabel Opstyg
Terminal lugs /Sepatu Cable Cu 150 mm² 8 Buah 259,800 2,078,400
Heatshrink / Isolasi Bakar Hitam/warna 150mm 8 Buah 83,200 665,600
Terminal lugs /Sepatu Cable Cu 70 mm² 2 Buah 126,400 252,800
Heatshrink / Isolasi Bakar Hitam/warna 70mm 2 Buah 55,400 110,800
Bimetal compression joint ( AL / CU ) + Heatshrink 70 - 70 mm2 8 Buah 157,600 1,260,800
Plastic Strap For JTR (20 Cm) 4 Buah 4,800 19,200
h. Konstruksi Pentanahan
Terminal lugs /Sepatu Cable Cu 50 mm² 12 Buah 113,000 1,356,000
Ground Rod + Clamp 5/8 x 2,5 mtr 4 Set 394,000 1,576,000
Kawat BC draad 50 mm² 25 Meter 138,200 3,455,000
Pipa galvanized 1" x 3.000 mm medium B 2 Buah 154,000 308,000
Pipa galvanized 1" x 1.000 mm medium B 2 Buah 55,800 111,600
Stainless Steel Strap 6 Meter 34,600 207,600
Stopping Buckle 6 Buah 6,400 38,400
Link 25 x 25 mm 4 Buah 6,200 24,800
i. Konstruksi Cover FCO, Arrester, dan Bushing Trafo
Tekep Isolator FCO bagian atas (untuk 1 phasa) 3 Set - -
Tekep Isolator FCO bagian bawah (untuk 1 phasa) 3 Set - -
Tekep Isolator Bushing TM dan TR Trafo (untuk 1 phasa) 7 Set - -
Tekep Isolator Arester (untuk 1 phasa) 3 Set - -
j. Jasa Pemasangan -
Konstruksi gardu tiang 3 phasa (konstruksi dudukan trafo, cut out, lightning
1 set 12,366,200 12,366,200
arrester, pentanahan, lemari bagi, trafo)
halaman : 17
HARGA PENAWARAN PER PAKET PEKERJAAN CLUSTER PROPINSI SULAWESI BARAT PT ..........
PERHITUNGAN BIAYA PEMBANGUNAN JTM, JTR DAN Gardu Distribusi JASKONHAR JTM JTR GD 2022
TIDAK TERMASUK HARGA MATERIAL DISTRIBUSI UTAMA (MDU)
VOLUME/PENGADAAN
HARGA PENAWARAN
(Rp) (Rp)
a b c d e f g
C JARINGAN TEGANGAN RENDAH
1 Pemasangan LVTC 1ph 1 kms
a. Material Utama
Bundle conductor (LVTC) 1 phasa 35 mm² 1 kms Material PLN
Compression non tension joint LVTC + heat shrink 35 mm² 3 bh 43,200 129,600
b. Pemasangan
Penarikan LVTC 1 phasa. 1 kms 8,749,600 8,749,600
JUMLAH Rp. 8,879,200
2 Pemasangan LVTC 3ph 1 kms (70 mm)
a. Material Utama
Bundle conductor (LVTC) 3 phasa 70 mm² 1 kms Material PLN
Compression non tension joint LVTC + heat shrink 50 mm² 3 bh 48,800 146,400
Compression non tension joint LVTC + heat shrink 70 mm² 1 bh 60,200 60,200
b. Pemasangan
Penarikan LVTC 3 phasa. 1 kms 11,802,200 11,802,200
JUMLAH Rp. 12,008,800
3 Pemasangan LVTC 3ph 1 kms (35 mm)
a. Material Utama
Bundle conductor (LVTC) 1 phasa 35 mm² 1 kms Material PLN
Compression non tension joint LVTC + heat shrink 35 mm² 4 bh 43,200 172,800
b. Pemasangan
Penarikan LVTC 3 phasa. 1 kms 8,820,400 8,820,400
JUMLAH Rp. 8,993,200
4 Pemasangan suspension / small angle assembly (per titik)
a. Material Utama
Small angle/Suspension Assembly 25-70 mm2 1 set 151,400 151,400
Stainless Steel Strap 1.5 mtr 34,600 51,900
Stopping Buckle 2 bh 6,400 12,800
Plastic Strap For JTR (20 Cm) 2 bh 4,800 9,600
b. Pemasangan 1 unit 77,800 77,800
JUMLAH Rp. 303,500
5 Pemasangan large angle assembly (per Titik)
a. Material Utama
Large angle assembly 50-70 mm2 1 set 234,400 234,400
Stainless Steel Strap 1.5 mtr 34,600 51,900
Stopping Buckle 2 bh 6,400 12,800
Plastic Strap For JTR (20 Cm) 2 bh 4,800 9,600
b. Pemasangan 1 unit 88,400 88,400
JUMLAH Rp. 397,100
6 Pemasangan dead end angle assembly
a. Material Utama
Adjustable Dead end assembly 50-70 mm2 1 set 227,600 227,600
Stainless Steel Strap 1.5 mtr 34,600 51,900
Stopping Buckle 2 bh 6,400 12,800
Plastic Strap For JTR (20 Cm) 2 bh 4,800 9,600
Electrical & Mechanical Protection Set 25-70 mm2 1 set 223,000 223,000
b. Pemasangan 1 unit 88,400 88,400
JUMLAH Rp. 613,300
7 Pemasangan pentanahan ujung JTR.
a. Material Utama
Unimax clamp 50 mm² / split bolt line tap for B27 1 bh 65,200 65,200
Kawat BC draad 50 mm² 9 mtr 138,200 1,243,800
Ground Rod + Clamp 5/8" x 2 mtr 1 set 337,800 337,800
Pipa galvanized 1" x 3.000 mm medium B 1 btg 154,000 154,000
Electrical & Mechanical Protection Set 25-70 mm2 1 set 223,000 223,000
Bimetal compression joint ( AL / CU ) + Heatshrink 35 - 50 mm2 1 bh 108,000 108,000
Stainless Steel Strap 4 mtr 34,600 138,400
Stopping Buckle 4 bh 6,400 25,600
Link 25 x 50 mm 4 bh 8,800 35,200
Plastic Strap For JTR (20 Cm) 2 bh 4,800 9,600
b. Pemasangan bundled end protection set + pentanahan. 1 unit 495,600 495,600
JUMLAH Rp. 2,836,200
8 Pemasangan pentanahan untuk perbaikan nilai tahanan 5 ohm
a. Material Utama
Unimax clamp 50 mm² / split bolt line tap for B27 2 bh 65,200 130,400
Kawat BC draad 50 mm² 2 mtr 138,200 276,400
Ground Rod + Clamp 5/8" x 2 mtr 1 set 337,800 337,800
b. Pemasangan pentanahan. 1 unit 424,800 424,800
JUMLAH Rp. 1,169,400
9. Pemasangan Sambungan LVTC - OPSTIG/PHBTR
a. Material Utama
Bimetal compression joint ( AL / CU ) + Heatshrink 50 - 50 mm2 1 bh 144,600 144,600
Bimetal compression joint ( AL / CU ) + Heatshrink 50 - 70 mm2 1 bh 144,600 144,600
Bimetal compression joint ( AL / CU ) + Heatshrink 70 - 70 mm2 3 bh 157,600 472,800
b. Pemasangan
JUMLAH Rp. 762,000
10 Pemasangan large angle assembly 25-35 mm
a. Material Utama
Large angle assembly 25-35 mm2 1 set 194,400 194,400
Stainless Steel Strap 1.5 mtr 34,600 51,900
Stopping Buckle 2 bh 6,400 12,800
b. Pemasangan 1 unit - -
halaman : 18
HARGA PENAWARAN PER PAKET PEKERJAAN CLUSTER PROPINSI SULAWESI BARAT PT ..........
PERHITUNGAN BIAYA PEMBANGUNAN JTM, JTR DAN Gardu Distribusi JASKONHAR JTM JTR GD 2022
TIDAK TERMASUK HARGA MATERIAL DISTRIBUSI UTAMA (MDU)
VOLUME/PENGADAAN
HARGA PENAWARAN
(Rp) (Rp)
a b c d e f g
JUMLAH Rp. 64,700
11 Pembongkaran LVTC dan ACC
Pembongkaran LVTC 3x35+25 mm2 1 kms 3,381,600 3,381,600
Pembongkaran LVTC 3x50+35 mm2 1 kms 3,381,600 3,381,600
Pembongkaran LVTC 3x70+50 mm2 1 kms 3,381,600 3,381,600
Pembongkaran LVTC 2x35+25 mm2 1 kms 3,381,600 3,381,600
Pembongkaran LVTC 2x25+25 mm2 1 kms 3,381,600 3,381,600
Pembongkaran Assecsories LVTC ( SAA) 1 set 38,800 38,800
Pembongkaran Assecsories LVTC ( DEA, LAA ) 1 set 42,400 42,400
Pembongkaran Bundled End Protection set JTR 1 set 35,400 35,400
Terbilang :
…………………….
halaman : 19
HARGA PENAWARAN MATERIAL JTM, JTR, GARDU DISTRIBUSI
CLUSTER PROPINSI SULAWESI BARAT PT ARTHA LESTARI ENGINEERING
JASA KONSTRUKSI DAN PEMELIHARAAN TAHUN 2022
PLN UNIT INDUK WILAYAH SULSELRABAR
HARGA PENAWARAN
No URAIAN KEGIATAN SAT VOL
MATERIAL
HARGA PENAWARAN
No URAIAN KEGIATAN SAT VOL
MATERIAL
HARGA PENAWARAN
No URAIAN KEGIATAN SAT VOL
MATERIAL
HARGA PENAWARAN
No URAIAN KEGIATAN SAT VOL
MATERIAL
196 F Neck Top Ties W/O Armor Rood A3C 70 mm2 Buah 1 Rp 113,400
197 F Neck Plastic Top Ties Semicon A3C_S 70 mm2 Buah 1 Rp 158,800
198 F Neck Plastic Top Ties Semicon A3C_S 150 mm2 Buah 1 Rp 167,600
199 F Neck Plastic Top Ties Semicon A3C_S 240 mm2 Buah 1 Rp 174,200
200 F Neck Plastic Double Side Ties Semicon A3C_S 70 mm2 Buah 1 Rp 225,200
201 F Neck Plastic Double Side Ties Semicon A3C_S 150 mm2 Buah 1 Rp 225,800
202 F Neck Plastic Double Side Ties Semicon A3C_S 240 mm2 Buah 1 Rp 220,000
203 Small angle/Suspension Assembly 25-70 mm2 Buah 1 Rp 151,400
204 Fixed Dead end assembly 25-35 mm2 Buah 1 Rp 173,800
205 Fixed Dead end assembly 50-70 mm2 Buah 1 Rp 197,600
206 Adjustable Dead end assembly 25-35 mm2 Buah 1 Rp 221,600
207 Adjustable Dead end assembly 50-70 mm2 Buah 1 Rp 227,600
208 Large angle assembly 25-35 mm2 Buah 1 Rp 194,400
209 Large angle assembly 50-70 mm2 Buah 1 Rp 234,400
210 Electrical & Mechanical Protection Set 25-70 mm2 Buah 1 Rp 223,000
211 Stainless Steel Strap Meter 1 Rp 34,600
212 Stopping Buckle Buah 1 Rp 6,400
213 Stopping Buckle Stainless Steel Buah 1 Rp 10,000
214 Link 25 x 25 mm Buah 1 Rp 6,200
215 Link 25 x 50 mm Buah 1 Rp 8,800
216 Sangga tupang tekan Buah 1 Rp 162,200
217 Connector kedap air 35-70mm2 Buah 1 Rp 63,800
218 Insulated tension joint 25 mm2 Buah 1 Rp 43,800
219 Insulated tension joint 35 mm2 Buah 1 Rp 44,200
220 Insulated tension joint 50 mm2 Buah 1 Rp 49,400
221 Insulated tension joint 70 mm2 Buah 1 Rp 57,400
222 Kawat BC draad 25 mm² Meter 1 Rp 125,600
223 Kawat BC draad 50 mm² Meter 1 Rp 138,200
224 Kawat BC draad 70 mm² Meter 1 Rp 153,000
225 Pipa Arde 1,5 " x 3.000 mm lengkap Set 1 Rp 960,600
226 Unimax clamp 50 mm² / split bolt line tap for B27 Buah 1 Rp 65,200
227 Ground Rod + Clamp 5/8" x 2 mtr Set 1 Rp 337,800
228 Ground Rod + Clamp 5/8 x 2,5 mtr Set 1 Rp 394,000
229 Clamp C ( C Connector ) 50 - 70 mm2 Buah 1 Rp 78,800
230 Parallel Groove CU 50 mm2 Buah 1 Rp 82,600
231 Comp Connector CU for grounding 70 + rubber tape Buah 1 Rp 91,600
232 Suspension Assembly For MVTIC ( 0 - 10 Derajat ) Set 1 Rp 905,800
233 Suspension Assembly MVTIC for Large Angle ( 10 - 25 Derajat ) Set 1 Rp 1,200,200
234 Single Dead End Assembly For MVTIC Set 1 Rp 1,135,600
235 Double Dead End Assembly For MVTIC ( Peregang, > 25 derajat ) Set 1 Rp 2,192,200
236 Ornament Cable for netral + bolt (Aksesoris Penggantung MVTIC) Buah 1 Rp -
237 Disconecting Switch (DS) 20 kV 1 Phs (SPM) Set 1 Rp 9,938,400
238 Dudukan Kubikel + Acrylic penutup Set 1 Rp 1,833,800
239 Double Beugel + Mour Baut untuk pipa 5" (Opstig KTM ) Set 1 Rp 194,000
240 Double Begel Galvanized 114 - 156 mm + baut Set 1 Rp 163,400
241 Double Begel Galvanized 175 - 215 mm + baut Set 1 Rp 184,000
242 Patok beton 20 x 20 x 70 cm tanda KTM PLN Buah 1 Rp 177,800
243 End mof Outdoor 20 kV 1 x 35x95 mm2 (Setara 3M) Set 1 Rp 6,141,400
244 End mof Outdoor 20 kV 3 x 35x95 mm2 (Setara 3M) Set 1 Rp 6,141,400
245 End mof Outdoor 20 kV 1 x 150-240 mm2 (Setara 3M) Set 1 Rp 8,607,800
246 End mof Indoor 20 kV 1 x 150-240 mm2 (Setara 3M) Set 1 Rp 8,600,000
247 End mof Outdoor 20 kV 3 x 150-240 mm2 (Setara 3M) Set 1 Rp 11,096,800
248 End mof Indoor 20 kV 3 x 150-240 mm2 (Setara 3M) Set 1 Rp 11,142,200
249 Elastic mould 20 kV 3 x 150-240 mm2 (Setara 3M) Set 1 Rp -
250 Jointing Heatshrink Cable 3 Core, Size Cable (Setara 3M) + Connector Set 1 Rp 13,570,200
251 Jointing Coldshrink Cable 3 Core, Size Cable (Setara 3M) + Connector Set 1 Rp 15,373,800
252 Jointing MVTIC 1 Core 3x95-300mm 20 kV (Setara 3M) Set 1 Rp 12,657,600
253 Screened Seperable Cable 1x95-240 mm2 sambungan (setara raychem) Set 1 Rp 32,397,600
HARGA PENAWARAN MATERIAL JTM, JTR, GARDU DISTRIBUSI
CLUSTER PROPINSI SULAWESI BARAT PT ARTHA LESTARI ENGINEERING
JASA KONSTRUKSI DAN PEMELIHARAAN TAHUN 2022
PLN UNIT INDUK WILAYAH SULSELRABAR
HARGA PENAWARAN
No URAIAN KEGIATAN SAT VOL
MATERIAL
254 Screened Seperable Cable 1x95-240 mm2 (setara raychem) Set 1 Rp 19,394,000
255 Screened Seperable Cable 3x95-240 mm2 sambungan (setara raychem) Set 1 Rp 34,423,800
256 Screened Seperable Cable 3x95-240 mm2 (setara raychem) Set 1 Rp 23,284,600
257 Electrical Insulating Sealer (Setara 3M) Buah 1 Rp 849,800
258 Insulation Piercing Connector 10-25 (SPM) Buah 1 Rp 45,000
259 Insulation Piercing Connector 35-70 (SPM) Buah 1 Rp 77,200
260 Plastic Strap For JTR (20 Cm) Buah 1 Rp 4,800
261 Plastic Strap For JTR (30 Cm) Buah 1 Rp 5,000
262 Non Tension Joint Copper 50mm Buah 1 Rp 62,800
263 Non Tension Joint Copper 70mm Buah 1 Rp 91,200
264 Non Tension Joint Copper 95mm Buah 1 Rp 111,000
265 Non Tension Joint Copper 150mm Buah 1 Rp 158,000
266 Compression Repair Sleeve 35mm Buah 1 Rp 260,000
267 Compression Repair Sleeve 70mm Buah 1 Rp 260,400
268 Compression Repair Sleeve 150mm Buah 1 Rp 329,200
269 Jumper Type C Copper 35-70 mm Buah 1 Rp 72,000
270 Copper Compression Ground Rod Connector 5/8" 50 mm Buah 1 Rp 51,800
271 Copper Compression Ground Rod Connector 5/8" 70 mm Buah 1 Rp 70,000
272 Heatshrink / Isolasi Bakar Hitam/warna 25mm Buah 1 Rp 64,400
273 Heatshrink / Isolasi Bakar Hitam/warna 35mm Buah 1 Rp 46,600
274 Heatshrink / Isolasi Bakar Hitam/warna 50mm Buah 1 Rp 55,400
275 Heatshrink / Isolasi Bakar Hitam/warna 70mm Buah 1 Rp 55,400
276 Heatshrink / Isolasi Bakar Hitam/warna 120mm Buah 1 Rp 82,200
277 Heatshrink / Isolasi Bakar Hitam/warna 150mm Buah 1 Rp 83,200
278 Socket Galvanized 5" Buah 1 Rp 1,051,000
279 Central Bracket + Mur Baut Set 1 Rp 283,000
280 Slide Bracket + Mur Baut Set 1 Rp 267,600
281 Cable Tray (20x30 cm) Buah 1 Rp 934,400
282 U Ditch L:60 cm T: 60 cm P:100 cm Buah 1 Rp 2,026,600
283 Connector (Shearbolt) Buah 1 Rp 661,800
284 Fusasaver Set 1 Rp 56,357,600
285 Fusasaver Communication Kit Set 1 Rp 5,059,000
286 Trafo Step up/down 10 A ; 220VAC-110VDC Buah 1 Rp -
287 Fuselink 2A Buah 1 Rp -
288 Fuselink 3A Buah 1 Rp -
289 Fuselink 5A Buah 1 Rp -
290 Fuselink 6A Buah 1 Rp -
291 Fuselink 8A Buah 1 Rp -
292 Treeguard 150-240 mm (Setara merk Vixo) meter 1 Rp -
Gembok gardu stainless steel berkode/angka (setara gembok Krisbow 4
293 Buah 1 Rp -
angka)
294 Exhaust fan (1180 - 2010 CFM) Buah 1 Rp -
295 Insulating Spray setara 3M Buah 1 Rp -
296 Cable Lug Shearbolt 95-240 Sqmm Buah 1 Rp -
297 Besi L panjang 2400 mm, 50x50x5 mm Buah 1 Rp -
298 Kawat Seling Baja 1,5 mm lapis Plastik PVC Meter 1 Rp -
299 U clamp 1-3 mm Buah 1 Rp -
300 Tekep Isolator Lurus Set 1 Rp -
301 Tekep Isolator Belokan Set 1 Rp -
Tekep Isolator Extention (untuk memperpanjang tekep isolator
302 Set 1 Rp -
lurus/belokan)
303 Kabel Tie Pendek untuk Tekep Buah 1 Rp -
304 Kabel Tie Panjang untuk Tekep Buah 1 Rp -
305 Tekep Isolator Arester (untuk 1 phasa) Set 1 Rp -
306 Tekep Isolator FCO bagian atas (untuk 1 phasa) Set 1 Rp -
307 Tekep Isolator FCO bagian bawah (untuk 1 phasa) Set 1 Rp -
308 Tekep Isolator Bushing TM dan TR Trafo (untuk 1 phasa) Set 1 Rp -
309 Tekep Isolator Connector untuk cover LLC dan jamperan percabangan Set 1 Rp -
310 Tekep Isolator Strainclamp Set 1 Rp -
Rp -
JUMLAH Rp 358,550,700
PPn 11% Rp 39,440,577
JUMLAH TOTAL Rp 397,991,277
Terbilang : ###
………………………….
HARGA PENAWARAN JASA JTM, JTR, GARDU DISTRIBUSI
CLUSTER PROPINSI SULAWESI BARAT PT ..........
JASA KONSTRUKSI DAN PEMELIHARAAN TAHUN 2022
PLN UNIT INDUK WILAYAH SULSELRABAR
HARGA
No URAIAN KEGIATAN SAT VOL PENAWARAN
JASA
71 Pemasangan suspension Assembly MVTIC for Large Angle ( 10 - 25 Derajat ) set 1 Rp 475,400
73 Pemasangan double Dead End Assembly For MVTIC ( Peregang, > 25 derajat ) set 1 Rp 1,177,800
HARGA
No URAIAN KEGIATAN SAT VOL PENAWARAN
JASA
90 Penggalian & Penimbunan 2 kabel tanah 20 kV di bawah berm + Material meter 1 Rp 422,600
91 Penggalian & Penimbunan 3 kabel tanah 20 kV di bawah berm + Material meter 1 Rp 636,200
92 Penggalian & Penimbunan 4 kabel tanah 20 kV di bawah berm + Material meter 1 Rp 788,200
93 Penggalian & Penimbunan 1 kabel tanah 20 kV di bawah jalan aspal + Material meter 1 Rp 1,592,200
94 Penggalian & Penimbunan 2 kabel tanah 20 kV di bawah jalan aspal + Material meter 1 Rp 1,888,000
95 Penggalian & Penimbunan 3 kabel tanah 20 kV di bawah jalan aspal + Material meter 1 Rp 2,414,600
96 Penggalian & Penimbunan 4 kabel tanah 20 kV di bawah jalan aspal + Material meter 1 Rp 3,212,000
133 Pemasangan LBS Motorized, recloser, FAI, PMCB ( lengkap assesories ) set 1 Rp 5,550,600
HARGA
No URAIAN KEGIATAN SAT VOL PENAWARAN
JASA
172 Pembongkaran suspension Assembly MVTIC for Large Angle ( 10 - 25 Derajat ) set 1 Rp 211,800
173 Pembongkaran single Dead End Assembly For MVTIC set 1 Rp 211,800
Pembongkaran double Dead End Assembly For MVTIC ( Peregang, > 25
174 set 1 Rp 282,400
derajat )
175 Pembongkaran Ornament Cable for Netral (Clamp C Penggantung MVTIC) buah 1 Rp -
195 Pembongkaran LBS Motorized, recloser, FAI, PMCB ( lengkap assesories ) set 1 Rp 2,229,600
HARGA
No URAIAN KEGIATAN SAT VOL PENAWARAN
JASA
222 Pembongkaran 4 kabel tanah 20 kV di bawah jalan aspal + Material meter 1 Rp 1,992,800
223 Pembongkaran KTM 3 Ph Single core 16- 50 mm2 meter 1 Rp 21,000
224 Pembongkaran KTM 3 Ph Single core 70- 150 mm2 meter 1 Rp 21,000
225 Pembongkaran KTM 3 Ph Single core 240-300 mm2 meter 1 Rp 35,000
226 Pembongkaran KTM 3 Ph three core 16- 50 mm2 meter 1 Rp 21,000
227 Pembongkaran KTM 3 Ph three core 70- 150 mm2 meter 1 Rp 35,000
228 Pembongkaran KTM 3 Ph three core 240-300 mm2 meter 1 Rp 35,000
229 Pembongkaran Antena SCADA pada LBS Recloser dan Gardu Hubung set 1 Rp -
230 Pembongkaran Penghalang Binatang/hewan buah 1 Rp -
Pembongkaran Kabel dan Pentanahan lengkap Antena Scada (Grounding
231 set 1 Rp -
Splitzen)
PEMELIHARAAN
232 Menegakkan tiang besi yang miring batang 1 Rp 845,400
233 Menegakkan tiang beton yang miring batang 1 Rp 981,600
234 Perbaikan tiang besi kropos (material+las) buah 1 Rp 1,778,800
235 Pengecatan tiang besi TM + Material batang 1 Rp 17,600
236 Pengencangan baut-baut sambungan ( Konector, skun, terminal, dll ) buah 1 Rp 278,800
237 Pengencangan (perbaikan andongan) gawang 1 Rp 278,800
238 Perbaikan penghantar terburai titik 1 Rp 315,800
239 Pembersihan rangka layang - layang, dll titik 1 Rp 106,000
240 Pembersihan Isolator, bushing 20 kV buah 1 Rp 52,800
241 Perbaikan posisi travers tunggal miring set 1 Rp 247,200
242 Perbaikan posisi travers double miring set 1 Rp 353,200
243 Perbaikan tupang tarik buah 1 Rp 177,200
244 Perbaikan posisi tupang tekan set 1 Rp 419,200
245 Pembersihan LBS manual 20 kV set 1 Rp 176,200
246 Pembersihan LBS motorized, FAI, recloser, FMCB set 1 Rp 70,600
263 Pemasangan travers UNP 6 dudukan Lemari bagi TR 3 phasa konst. 1 tiang set 17 Rp 252,800
264 Pemasangan travers UNP 6 dudukan Lemari bagi TR 3 phasa konst. 2 tiang set 18 Rp 421,400
279 Pemasangan kubikel air insulated motorized, Outgoing LBS + Fuse 20 kV set 33 Rp 1,427,000
280 Pemasangan kubikel air insulated motorized, Outgoing (CB) 20 kV set 34 Rp 1,427,000
281 Pemasangan kubikel fully insulated Manual, Incoming LBS 20 kV set 35 Rp 1,427,000
282 Pemasangan kubikel fully insulated Motorized, Incoming LBS 20 kV set 36 Rp 1,084,400
283 Pemasangan kubikel fully insulated Motorized, Incoming CB 20 kV set 37 Rp 1,141,600
284 Pemasangan kubikel fully insulated Motorized, Outgoing CB 20 kV set 38 Rp 1,141,600
285 Pemasangan kubikel fully insulated Motorized, Outgoing LBS 20 kV set 39 Rp 1,427,000
286 Pemasangan kubikel fully insulated Motorized, Outgoing LBS+Fuse 20 kV set 40 Rp 998,800
HARGA
No URAIAN KEGIATAN SAT VOL PENAWARAN
JASA
PEMBONGKARAN
301 Pembongkaran Trafo 1 Fasa set 1 Rp 634,000
302 Pembongkaran Trafo 3 Fasa set 1 Rp 845,400
303 Pembongkaran travers / pembesian isolator aspan set 1 Rp 169,000
304 Pembongkaran travers / pembesian isolator tumpu set 1 Rp 126,800
305 Pembongkaran kabel Naik/turun 1 jurusan u/ GT 1 fs set 1 Rp 207,000
306 Pembongkaran kabel Naik/turun 2 jurusan u/ GT 1 fs set 1 Rp 211,200
307 Pembongkaran kabel Naik/turun 1 jurusan u/ GT 3 fs set 1 Rp 401,400
308 Pembongkaran kabel Naik/turun 2 jurusan u/ GT 3 fs set 1 Rp 422,600
309 Pembongkaran kabel Naik/turun 3 jurusan u/ GT 3 fs set 1 Rp 739,600
310 Pembongkaran kabel Naik/turun 4 jurusan u/ GT 3 fs set 1 Rp 634,000
311 Pembongkaran dudukan / konstruksi trafo 1 Fasa 1 tiang set 1 Rp 211,200
312 Pembongkaran dudukan / konstruksi trafo 3 Fasa 1 tiang set 1 Rp 211,200
313 Pembongkaran dudukan / konstruksi trafo 3 fasa 2 tiang set 1 Rp 490,800
314 Pembongkaran travers dudukan FCO / LA untuk GD tiang 1 phasa set 1 Rp 147,800
315 Pembongkaran travers UNP 6 dudukan Lemari bagi TR 1 phasa set 1 Rp 126,800
316 Pembongkaran travers UNP 6 dudukan Lemari bagi TR 3 phasa konst. 1 tiang set 1 Rp 126,800
317 Pembongkaran travers UNP 6 dudukan Lemari bagi TR 3 phasa konst. 2 tiang set 1 Rp 211,200
PEMELIHARAAN
348 Pembersihan, pelumasan kubikel air insulated 20 kV set 1 Rp 339,200
349 Penggantian Heater kubikel air insulated 20 kV bh 1 Rp 212,000
350 Pengambilan contoh minyak trafo bh 1 Rp 105,800
351 Penggantian minyak trafo (jasa) liter 1 Rp 353,000
352 Penambahan minyak trafo (jasa) liter 1 Rp 105,000
353 Pengukuran beban gardu distribusi & tegangan ujung JTR 1 fasa gardu 1 Rp 79,400
354 Pengukuran beban gardu distribusi & tegangan ujung JTR 3 fasa 2 jurusan gardu 1 Rp 211,800
355 Pengukuran beban gardu distribusi & tegangan ujung JTR 3 fasa 4 jurusan gardu 1 Rp 282,600
Pemeliharaan gardu distribusi 1 phasa ( pembersihan, pengencangan baut,
356 set 1 Rp 336,600
pelumasan )
Pemeliharaan gardu distribusi 3 phasa ( pembersihan, pengencangan baut,
357 set 1 Rp 505,000
pelumasan )
358 Pengecatan lemari bagi 1 phasa 2 jurusan + Material cat panel 1 Rp 301,200
359 Pengecatan lemari bagi 3 phasa 2 jurusan + Material cat panel 1 Rp -
360 Pengecatan lemari bagi 3 phasa 4 jurusan + Material cat panel 1 Rp 462,400
361 Pengecatan lemari bagi 3 phasa 6 jurusan + Material cat panel 1 Rp -
362 Penyeimbangan beban gardu distribusi 1 jurusan bh 1 Rp 841,800
363 Penyeimbangan beban gardu distribusi 2 jurusan bh 1 Rp 1,262,600
HARGA PENAWARAN JASA JTM, JTR, GARDU DISTRIBUSI
CLUSTER PROPINSI SULAWESI BARAT PT ..........
JASA KONSTRUKSI DAN PEMELIHARAAN TAHUN 2022
PLN UNIT INDUK WILAYAH SULSELRABAR
HARGA
No URAIAN KEGIATAN SAT VOL PENAWARAN
JASA
430 Penggalian & Penimbunan 1 kabel tanah SUTR di bawah berm + Material meter 1 Rp 359,400
431 Penggalian & Penimbunan 2 kabel tanah SUTR di bawah berm + Material meter 1 Rp 401,000
432 Penggalian & Penimbunan 3 kabel tanah SUTR di bawah berm + Material meter 1 Rp 579,400
433 Penggalian & Penimbunan 5 kabel tanah SUTR di bawah berm + Material meter 1 Rp 709,200
434 Penggalian & Penimbunan 1 kabel tanah SUTR di bawah trotar + Material meter 1 Rp 439,200
435 Penggalian & Penimbunan 1 kabel tanah SUTR di bawah jalan aspal + Material meter 1 Rp 1,430,600
HARGA PENAWARAN JASA JTM, JTR, GARDU DISTRIBUSI
CLUSTER PROPINSI SULAWESI BARAT PT ..........
JASA KONSTRUKSI DAN PEMELIHARAAN TAHUN 2022
PLN UNIT INDUK WILAYAH SULSELRABAR
HARGA
No URAIAN KEGIATAN SAT VOL PENAWARAN
JASA
PEMBONGKARAN
450 Pencabutan tiang besi batang 1 Rp 489,200
451 Pencabutan tiang beton batang 1 Rp 978,600
452 Pembongkaran LVTC 3x35+25 mm2 kms 1 Rp 3,381,600
453 Pembongkaran LVTC 3x50+35 mm2 kms 1 Rp 3,381,600
454 Pembongkaran LVTC 3x70+50 mm2 kms 1 Rp 3,381,600
455 Pembongkaran LVTC 2x35+25 mm2 kms 1 Rp 3,381,600
456 Pembongkaran LVTC 2x25+25 mm2 kms 1 Rp 3,381,600
457 Pembongkaran Assecsories LVTC ( SAA) set 1 Rp 38,800
458 Pembongkaran Assecsories LVTC ( DEA, LAA ) set 1 Rp 42,400
459 Pembongkaran Bundled End Protection set JTR set 1 Rp 35,400
460 Pembongkaran Jaring AL 25 - 35 mm2 kms 1 Rp 3,926,400
461 Pembongkaran Jaring AL 50 - 70 mm2 kms 1 Rp 3,926,400
462 Pembongkaran Jaring BC 6 - 16 mm2 kms 1 Rp 3,926,400
463 Pembongkaran Jaring BC 25 - 50 mm2 kms 1 Rp 3,926,400
464 Pembongkaran Tupang tarik TR set 1 Rp 638,200
465 Pembongkaran Tupang tarik dengan tiang bantu TR set 1 Rp 971,400
466 Pembongkaran tupang tekan TR set 1 Rp 1,284,600
467 Pembongkaran KTR 3 phasa 6 - 16 mm2 (untuk SKSR) meter 2 Rp -
468 Pembongkaran KTR 3 phasa 25 - 70 mm2 meter 1 Rp 31,800
469 Pembongkaran KTR 3 phasa 95 - 150 mm2 (+pms pasir urug & btn pelindung) meter 1 Rp 40,200
470 Pembongkaran KTR 3 phasa 240 - 300 mm2 (+pms pasir urug & btn pelindung) meter 1 Rp 46,600
PEMELIHARAAN
491 Pengecatan tiang besi TR + Material batang 1 Rp 752,600
492 Perbaikan Pentanahan ujung / percabangan JTR set 1 Rp 208,600
493 Menegakkan tiang besi yang miring batang 1 Rp 845,400
494 Menegakkan tiang beton yang miring batang 1 Rp 981,600
495 Perbaikan tiang besi kropos (material+las) buah 1 Rp 1,778,800
496 Pengencangan baut-baut sambungan ( Konector, skun, terminal, dll ) buah 1 Rp 17,600
497 Pengencangan (perbaikan andongan) gawang 1 Rp 278,800
498 Pembersihan rangka layang - layang, dll titik 1 Rp 106,000
499 Perbaikan tupang tarik buah 1 Rp 177,200
500 Perbaikan posisi tupang tekan set 1 Rp 419,200
Gardu dalam
504 Biaya Pelaksanaan Komunikasi bermakna & Written Agreement 1 Rp -
lahan warga
HARGA
No URAIAN KEGIATAN SAT VOL PENAWARAN
JASA
JUMLAH Rp 1,394,658,500
PPn 11% Rp 153,412,435
JUMLAH TOTAL Rp 1,548,070,935
Terbilang :
…………………………………….