HARGA PENAWARAN PER PAKET PEKERJAAN CLUSTER PROPINSI SULAWESI BARAT PT ..........

PERHITUNGAN BIAYA PEMBANGUNAN JTM, JTR DAN Gardu Distribusi JASKONHAR JTM JTR GD 2022
TIDAK TERMASUK HARGA MATERIAL DISTRIBUSI UTAMA (MDU)

VOLUME/PENGADAAN
HARGA PENAWARAN

No. URAIAN KEGIATAN PLN REKANAN JUMLAH HARGA


SAT HARGA SATUAN
(MDU) (NON MDU) (g=fxd)

(Rp) (Rp)
a b c d e f g
A. SKTM
1 Penarikan kawat SKTM 3 x 240 mm 1 kms.
a. Material Utama
SKTM 3 x 240 mm² 1 kms Material PLN
Ligtning Arrester 3 bh Material PLN
End mof Outdoor 20 kV 3 x 150-240 mm2 (Setara 3M) 2 bh 11,096,800 22,193,600
Cable Lug Shearbolt 95-240 Sqmm 6 bh - -
Jointing Heatshrink Cable 3 Core, Size Cable (Setara 3M) + Connector 4 bh 13,570,200 54,280,800
Disconecting Switch (DS) 20 kV 1 Phs (SPM) 3 bh 9,938,400 29,815,200
Double Beugel + Mour Baut untuk pipa 5" (Opstig KTM ) 4 bh 194,000 776,000
Travers/ Cross arm UNP 100 x 50 x 5 x 2000 mm 3 bh 1,054,400 3,163,200
Besi L panjang 700 mm, 50x50x5mm. 2 bh 193,800 387,600
Mur Baut 1/2" x 50 mm 8 bh 17,000 136,000
Beugel + mur baut 2 bh 142,800 285,600
Double beugel / Clam Beugel 2 bh 133,000 266,000
Pipa galvanized 5" x 6.000 mm medium B 2 bh 2,612,400 5,224,800
Patok beton 20 x 20 x 70 cm tanda KTM PLN 20 bh 177,800 3,556,000
b. Pentanahan
Kawat AAAC 70 mm² 36 Meter Material PLN
Pipa galvanized 1" x 6.000 mm medium B 2 Buah 364,600 729,200
Stainless Steel Strap 6 Meter 34,600 207,600
Stopping Buckle 4 Buah 6,400 25,600
Link 25 x 25 mm 4 Buah 6,200 24,800
Pipa Arde 1,5 " x 3.000 mm lengkap 2 Set 960,600 1,921,200
Terminal lugs /Sepatu Cable Bimetal (Al/Cu) 70 mm² 2 Buah 147,800 295,600
Compression connector AL 70 - 70 mm2 ( CCO ) 2 Buah 37,000 74,000
c. Pemasangan
Pemasangan/penarikan 1 kms 442,272,000 442,272,000
JUMLAH Rp. 565,634,800
2 Penarikan kawat SKTM 3 x 150 mm 1 kms.
a. Material Utama
SKTM 3 x 150 mm² 1 kms Material PLN
Ligtning Arrester 3 bh Material PLN
End mof Outdoor 20 kV 3 x 150-240 mm2 (Setara 3M) 2 bh 11,096,800 22,193,600
Cable Lug Shearbolt 95-240 Sqmm 6 bh - -
Jointing Heatshrink Cable 3 Core, Size Cable (Setara 3M) + Connector 4 bh 13,570,200 54,280,800
Disconecting Switch (DS) 20 kV 1 Phs (SPM) 3 bh 9,938,400 29,815,200
Double Beugel + Mour Baut untuk pipa 5" (Opstig KTM ) 4 bh 194,000 776,000
Travers/ Cross arm UNP 100 x 50 x 5 x 2000 mm 3 bh 1,054,400 3,163,200
Besi L panjang 700 mm, 50x50x5mm. 2 bh 193,800 387,600
Mur Baut 1/2" x 50 mm 8 bh 17,000 136,000
Beugel + mur baut 2 bh 142,800 285,600
Double beugel / Clam Beugel 2 bh 133,000 266,000
Pipa galvanized 5" x 6.000 mm medium B 2 bh 2,612,400 5,224,800
Copper Compression Ground Rod Connector 5/8" 70 mm 20 bh 70,000 1,400,000
b. Pentanahan
Kawat AAAC 70 mm² 36 Meter Material PLN
Pipa galvanized 1" x 6.000 mm medium B 2 Buah 364,600 729,200
Stainless Steel Strap 6 Meter 34,600 207,600
Stopping Buckle 4 Buah 6,400 25,600
Link 25 x 25 mm 4 Buah 6,200 24,800
Pipa Arde 1,5 " x 3.000 mm lengkap 2 Set 960,600 1,921,200
Terminal lugs /Sepatu Cable Bimetal (Al/Cu) 70 mm² 2 Buah 147,800 295,600
Compression connector AL 70 - 70 mm2 ( CCO ) 2 Buah 37,000 74,000
c. Pemasangan
- Pemasangan/penarikan 1 kms 439,142,800 439,142,800
JUMLAH Rp. 560,349,600
2 Penarikan kawat SKTM 150 mm (khusus Pelanggan)
a. Material Utama
SKTM 3 x 150 mm² 0.05 kms Material PLN
Ligtning Arrester 3 bh Material PLN
End mof Outdoor 20 kV 3 x 150-240 mm2 (Setara 3M) 1 bh 11,096,800 11,096,800
End mof Indoor 20 kV 3 x 150-240 mm2 (Setara 3M) 1 bh 11,142,200 11,142,200
Cable Lug Shearbolt 95-240 Sqmm 6 bh - -
Disconecting Switch (DS) 20 kV 1 Phs (SPM) 3 bh 9,938,400 29,815,200
Double Beugel + Mour Baut untuk pipa 5" (Opstig KTM ) 2 bh 194,000 388,000
Beugel + mur baut pengikat pipa 3" + mur baut 1 bh 180,000 180,000
Travers/ Cross arm UNP 100 x 50 x 5 x 2000 mm 3 bh 1,054,400 3,163,200
Besi L panjang 700 mm, 50x50x5mm. 2 bh 193,800 387,600
Mur Baut 1/2" x 50 mm 8 bh 17,000 136,000
Beugel + mur baut 2 bh 142,800 285,600
Double beugel / Clam Beugel 2 bh 133,000 266,000
Pipa galvanized 5" x 6.000 mm medium B 1 bh 2,612,400 2,612,400
b. Pentanahan outdoor
Kawat AAAC 70 mm² 36 Meter Material PLN
Pipa galvanized 1" x 6.000 mm medium B 2 Buah 364,600 729,200
Stainless Steel Strap 6 Meter 34,600 207,600
Stopping Buckle 4 Buah 6,400 25,600
Link 25 x 25 mm 4 Buah 6,200 24,800
Pipa Arde 1,5 " x 3.000 mm lengkap 2 Set 960,600 1,921,200
Terminal lugs /Sepatu Cable Bimetal (Al/Cu) 70 mm² 2 Buah 147,800 295,600
Compression connector AL 70 - 70 mm2 ( CCO ) 2 Buah 37,000 74,000
c. Pentanahan indoor

halaman : 1
HARGA PENAWARAN PER PAKET PEKERJAAN CLUSTER PROPINSI SULAWESI BARAT PT ..........
PERHITUNGAN BIAYA PEMBANGUNAN JTM, JTR DAN Gardu Distribusi JASKONHAR JTM JTR GD 2022
TIDAK TERMASUK HARGA MATERIAL DISTRIBUSI UTAMA (MDU)

VOLUME/PENGADAAN
HARGA PENAWARAN

No. URAIAN KEGIATAN PLN REKANAN JUMLAH HARGA


SAT HARGA SATUAN
(MDU) (NON MDU) (g=fxd)

(Rp) (Rp)
a b c d e f g
Kawat BC draad 50 mm² 18 Meter 138,200 2,487,600
Kawat AAAC 70 mm² 9 Meter Material PLN
Mur Baut 1/2" x 50 mm 1 Buah 17,000 17,000
Pipa galvanized 1" x 6.000 mm medium B 1 Buah 364,600 364,600
Stainless Steel Strap 3 Meter 34,600 103,800
Stopping Buckle 2 Buah 6,400 12,800
Link 25 x 25 mm 2 Buah 6,200 12,400
Pipa Arde 1,5 " x 3.000 mm lengkap 3 Set 960,600 2,881,800
Terminal lugs /Sepatu Cable Bimetal (Al/Cu) 70 mm² 1 Buah 147,800 147,800
Bimetal compression joint ( AL / CU ) + Heatshrink 70 - 50 mm2 1 Buah 157,600 157,600
Terminal lugs /Sepatu Cable Cu 50 mm² 3 Buah 113,000 339,000

Air Insulated Motorized, Outgoing LBS 20 kV 1 set Material PLN


Air Insulated Switchgear, LBS Motorized; 24 kV; 630 A; 16 kA 1 set Material PLN
Travers/ Cross arm UNP 100 x 50 x 5 x 2000 mm 4 btg 1,054,400 4,217,600
Besi L panjang 700 mm, 50x50x5mm. 2 bh 193,800 387,600
Unimax clamp 50 mm² / split bolt line tap for B27 3 btg 65,200 195,600
Kabel NYM 2x2.5 mm2 10 meter - -
Pipa PVC 1" x 6.000 mm (Setara Maspion) 3 Btg 16,000 48,000
Knee PVC 1" 6 bh 13,000 78,000
Trafo Step up/down 10 A ; 220VAC-110VDC 1 bh - -
Beugel + mur baut pengikat pipa 3" + mur baut 3 set 180,000 540,000
Beugel + mur baut 3 set 142,800 428,400
Travers dudukan PHB TR 3 phasa lengkap (UNP 6,5 x 600 mm) 3 bh 389,200 1,167,600
d. Pemasangan -
- Pemasangan/penarikan 1 Plg 26,407,400 26,407,400
JUMLAH Rp. 102,745,600
SKUTM/MVTIC
1 Penarikan kawat MVTIC 3 phasa 240 mm
a. Material Utama
MVTIC 3 x 240 mm² + 150 mm² 1 kms Material PLN
Tiang Beton 12 Meter / 350 daN 35 bh Material PLN
Ligtning Arrester 6 bh Material PLN
Isolator tumpu 20 KV 6 bh Material PLN
End mof Outdoor 20 kV 3 x 150-240 mm2 (Setara 3M) 2 Set 11,096,800 22,193,600
Cable Lug Shearbolt 95-240 Sqmm 6 bh - -
Jointing MVTIC 1 Core 3x95-300mm 20 kV (Setara 3M) 12 bh 12,657,600 151,891,200
Connector (Shearbolt) 12 bh 661,800 7,941,600
Disconecting Switch (DS) 20 kV 1 Phs (SPM) 3 bh 9,938,400 29,815,200
Suspension Assembly For MVTIC ( 0 - 10 Derajat ) 24 bh 905,800 21,739,200
Suspension Assembly MVTIC for Large Angle ( 10 - 25 Derajat ) 6 bh 1,200,200 7,201,200
Double Dead End Assembly For MVTIC ( Peregang, > 25 derajat ) 5 bh 2,192,200 10,961,000
Ornament Cable for netral + bolt (Aksesoris Penggantung MVTIC) 960 set - -
Galvanized Steel Wire 70 mm2 1000 mtr 38,600 38,600,000
Pemasangan Tupang tarik 10 set 706,600 7,066,000
Penghalang panjat 35 Buah 220,000 7,700,000
Papan tanda kilat/ Tanda bahaya 36 Buah 110,000 3,960,000
Double Beugel + Mour Baut untuk pipa 5" (Opstig KTM ) 8 buah 194,000 1,552,000
b. Dudukan Jointing MVTIC 4 set
Besi L panjang 700 mm, 50x50x5mm. 16 Buah 193,800 3,100,800
Double beugel khusus 4 Set 121,200 484,800
Plastic Strap For JTR (30 Cm) 12 Buah 5,000 60,000
Travers dudukan PHB TR 3 phasa lengkap (UNP 6,5 x 750 mm) 8 Buah 431,000 3,448,000
Bolt double arming 5/8" x300 mm 8 Buah 61,800 494,400
Mur Baut 1/2" x 50 mm 40 BUah 17,000 680,000
c. Pentanahan 2 Set
Kawat AAAC 70 mm² 36 Meter Material PLN
Pipa galvanized 1" x 6.000 mm medium B 2 Buah 364,600 729,200
Stainless Steel Strap 6 Meter 34,600 207,600
Stopping Buckle 4 Buah 6,400 25,600
Link 25 x 25 mm 4 Buah 6,200 24,800
Pipa Arde 1,5 " x 3.000 mm lengkap 2 Set 960,600 1,921,200
Terminal lugs /Sepatu Cable Bimetal (Al/Cu) 70 mm² 2 Buah 147,800 295,600
Compression connector AL 70 - 70 mm2 ( CCO ) 2 Buah 37,000 74,000
d. Pemasangan
- Pemasangan/penarikan 1 kms 97,973,000 97,973,000
JUMLAH Rp. 420,140,000
1 Penarikan kawat MVTIC 3 phasa 150 mm
a. Material Utama
MVTIC 3 x 150 mm² + 95 mm² 1 kms Material PLN
Tiang Beton 12 Meter / 350 daN 35 bh Material PLN
Ligtning Arrester 6 bh Material PLN
Isolator tumpu 20 KV 6 bh Material PLN
End mof Outdoor 20 kV 3 x 150-240 mm2 (Setara 3M) 2 Set 11,096,800 22,193,600
Cable Lug Shearbolt 95-240 Sqmm 6 bh - -
Jointing MVTIC 1 Core 3x95-300mm 20 kV (Setara 3M) 12 bh 12,657,600 151,891,200
Connector (Shearbolt) 12 bh 661,800 7,941,600
Disconecting Switch (DS) 20 kV 1 Phs (SPM) 3 bh 9,938,400 29,815,200
Suspension Assembly For MVTIC ( 0 - 10 Derajat ) 24 bh 905,800 21,739,200
Suspension Assembly MVTIC for Large Angle ( 10 - 25 Derajat ) 6 bh 1,200,200 7,201,200
Double Dead End Assembly For MVTIC ( Peregang, > 25 derajat ) 5 bh 2,192,200 10,961,000

halaman : 2
HARGA PENAWARAN PER PAKET PEKERJAAN CLUSTER PROPINSI SULAWESI BARAT PT ..........
PERHITUNGAN BIAYA PEMBANGUNAN JTM, JTR DAN Gardu Distribusi JASKONHAR JTM JTR GD 2022
TIDAK TERMASUK HARGA MATERIAL DISTRIBUSI UTAMA (MDU)

VOLUME/PENGADAAN
HARGA PENAWARAN

No. URAIAN KEGIATAN PLN REKANAN JUMLAH HARGA


SAT HARGA SATUAN
(MDU) (NON MDU) (g=fxd)

(Rp) (Rp)
a b c d e f g
Ornament Cable for netral + bolt (Aksesoris Penggantung MVTIC) 960 set - -
Galvanized Steel Wire 70 mm2 1000 mtr 38,600 38,600,000
Pemasangan Tupang tarik 10 set 706,600 7,066,000
Penghalang panjat 35 Meter 220,000 7,700,000
Papan tanda kilat/ Tanda bahaya 36 Buah 110,000 3,960,000
Double Beugel + Mour Baut untuk pipa 5" (Opstig KTM ) 8 buah 194,000 1,552,000
b. Dudukan Jointing MVTIC 4 set
Besi L panjang 700 mm, 50x50x5mm. 16 Buah 193,800 3,100,800
Double beugel khusus 4 Buah 121,200 484,800
Plastic Strap For JTR (30 Cm) 12 Buah 5,000 60,000
Travers dudukan PHB TR 3 phasa lengkap (UNP 6,5 x 750 mm) 8 Buah 431,000 3,448,000
Bolt double arming 5/8" x300 mm 8 Buah 61,800 494,400
Mur Baut 1/2" x 50 mm 40 BUah 17,000 680,000
c. Pentanahan 2 Set
Kawat AAAC 70 mm² 36 Meter Material PLN
Pipa galvanized 1" x 6.000 mm medium B 2 Buah 364,600 729,200
Stainless Steel Strap 6 Meter 34,600 207,600
Stopping Buckle 4 Buah 6,400 25,600
Link 25 x 25 mm 4 Buah 6,200 24,800
Pipa Arde 1,5 " x 3.000 mm lengkap 2 Set 960,600 1,921,200
Terminal lugs /Sepatu Cable Bimetal (Al/Cu) 70 mm² 2 Buah 147,800 295,600
Compression connector AL 70 - 70 mm2 ( CCO ) 2 Buah 37,000 74,000
d. Pemasangan
- Pemasangan/penarikan 1 kms 78,977,000 78,977,000
JUMLAH Rp. 401,144,000
JARINGAN TEGANGAN MENENGAH
1 Penarikan kawat JTM 3 phasa 1 kms ( 240 mm)
a. Material Utama
- Kawat AAAC-S 240 mm² 3.15 kms Material PLN
b. Pemasangan
- Pemasangan/penarikan 1 kms 18,257,400 18,257,400
JUMLAH Rp. 18,257,400
1 Penarikan kawat JTM 3 phasa 1 kms (150 mm)
a. Material Utama
- Kawat AAAC-S 150 mm² 3.15 kms Material PLN
b. Pemasangan
- Pemasangan/penarikan 1 kms 15,649,200 15,649,200
JUMLAH Rp. 15,649,200
2 Penarikan kawat JTM 3 phasa 1 kms.
a. Material Utama
- Kawat AAAC/S 70 mm² 3.15 kms Material PLN
b. Pemasangan
- Pemasangan/penarikan 1 kms 13,041,000 13,041,000
JUMLAH Rp. 13,041,000
3 Penarikan kawat JTM 3 phasa 1 kms.
a. Material Utama
- Kawat AAAC 70 mm² 3.09 kms Material PLN
b. Pemasangan
- Pemasangan/penarikan 1 kms 11,895,400 11,895,400
JUMLAH Rp. 11,895,400
4 Penarikan Kawat JTM 1 phasa 1 kms
a. Material Utama
- Kawat AA3C/S 70 mm2 1.05 kms Material PLN
b. Pemasangan
- Pemasangan/Penarikan 1 kms 4,347,000 4,347,000
JUMLAH Rp. 4,347,000
5 Pemasangan LBS 20 kV
a. Material Utama
Pole mounted LBS 20 kV 630 Amper 1 Unit Material PLN
Ground Rod + Clamp 5/8" x 2 mtr 1 btg 337,800 337,800
Pipa galvanized 1" x 3.000 mm medium B 1 btg 154,000 154,000
Unimax clamp 50 mm² / split bolt line tap for B27 1 buah 65,200 65,200
Kawat BC draad 50 mm² 15 mtr 138,200 2,073,000
Terminal lugs /Sepatu Cable Cu 50 mm² 1 buah 113,000 113,000
Stainless Steel strap 2 mtr 34,600 69,200
Stopping Buckle Stainless Steel 2 buah 10,000 20,000
Link 25 x 50 mm 2 buah 8,800 17,600
b. Pemasangan 1 Unit 4,814,200 4,814,200
JUMLAH Rp. 7,664,000
6 Pemasangan Cut Out 3 phasa 20 kV (konstruksi jaringan percabangan)
a. Material Utama
Cut Out 100 Amper 20 kV 3 bh Material PLN -
Fuselink 8A 3 bh - -
Compression connector AL 70 - 150 mm2 ( CCO ) 3 bh 50,200 150,600
Terminal lugs /Sepatu Cable Bimetal (Al/Cu) 70 mm² 6 bh 147,800 886,800
Tekep Isolator FCO bagian atas (untuk 1 phasa) 3 bh - -
Tekep Isolator FCO bagian bawah (untuk 1 phasa) 3 bh - -
b. Pemasangan 1 set 529,800 529,800
JUMLAH Rp. 1,567,200

halaman : 3
HARGA PENAWARAN PER PAKET PEKERJAAN CLUSTER PROPINSI SULAWESI BARAT PT ..........
PERHITUNGAN BIAYA PEMBANGUNAN JTM, JTR DAN Gardu Distribusi JASKONHAR JTM JTR GD 2022
TIDAK TERMASUK HARGA MATERIAL DISTRIBUSI UTAMA (MDU)

VOLUME/PENGADAAN
HARGA PENAWARAN

No. URAIAN KEGIATAN PLN REKANAN JUMLAH HARGA


SAT HARGA SATUAN
(MDU) (NON MDU) (g=fxd)

(Rp) (Rp)
a b c d e f g
7 Pemasangan Cut Out 3 phasa 20 kV (konstruksi jaringan lurus)
a. Material Utama
Cut Out 100 Amper 20 Kv 3 bh Material PLN
Fuselink 8A 3 bh - -
Compression connector AL 70 - 150 mm2 ( CCO ) 3 bh 50,200 150,600
Travers dudukan fuse cut out/Arrester UNP 10 x 2000 mm 1 bh 1,054,400 1,054,400
Besi L panjang 700 mm, 50x50x5mm. 1 bh 193,800 193,800
Terminal lugs /Sepatu Cable Bimetal (Al/Cu) 70 mm² 6 bh 147,800 886,800
double beugel khusus 1 set 121,200 121,200
Mur Baut 1/2" x 50 mm 1 bh 17,000 17,000
b. Pemasangan
Pemasangan FCO 3 phasa 20 Kv (Untuk percabangan Lurus) 1 set 1,288,200 1,288,200
Pemasangan Travers TM 20 KV UNP 10 panjang 2 - 2,4 Mtr 1 bh 379,200 379,200
JUMLAH Rp. 4,091,200
8 Pems.pembesian & isolator tumpu Tgl 20KV 3 PH UNP 10 3pl pd t.btn (Konstruksi 2 - 1)
a. Material Utama
Pin post insulator 20 KV 3 bh Material PLN
F Neck Plastic Top Ties Semicon A3C_S 150 mm2 3 bh 167,600 502,800
Travers dudukan fuse cut out/Arrester UNP 10 x 2000 mm 1 bh 1,054,400 1,054,400
Besi L panjang 700 mm, 50x50x5mm. 0 bh 193,800 -
Bolt double arming 5/8" x350 mm 2 bh 67,000 134,000
Mur Baut 1/2" x 50 mm 1 bh 17,000 17,000
Penghalang panjat 1 bh 220,000 220,000
Papan tanda kilat/ Tanda bahaya 1 bh 110,000 110,000
Stainless Steel strap 1 mtr 34,600 34,600
Stopping Buckle Stainless Steel 1 bh 10,000 10,000
b. Pemasangan 1 set 4,032,000 4,032,000
JUMLAH Rp. 6,114,800
9 Pems.pembesian & isolator tumpu gd 20KV 3 PH UNP 10 3pl pd.t.btn (Konstruksi 2 - 1)
a. Material Utama
Pin post insulator 20 KV 6 bh Material PLN
F Neck Plastic Double Side Ties Semicon A3C_S 150 mm2 3 Set 225,800 677,400
Travers dudukan fuse cut out/Arrester UNP 10 x 2000 mm 2 bh 1,054,400 2,108,800
Bolt double arming 5/8" x350 mm 4 bh 67,000 268,000
Besi L panjang 700 mm, 50x50x5mm. 0 bh 193,800 -
Mur Baut 1/2" x 50 mm 2 bh 17,000 34,000
Penghalang panjat 1 bh 220,000 220,000
Papan tanda kilat/ Tanda bahaya 1 bh 110,000 110,000
Stainless Steel strap 1 mtr 34,600 34,600
Stopping Buckle Stainless Steel 1 bh 10,000 10,000
b. Pemasangan 1 set 7,834,800 7,834,800
JUMLAH Rp. 11,297,600
10 Pems.pembesian & isolator tumpu Tgl 20KV 3 PH Consul UNP 10 3pl pd t.btn
a. Material Utama
Pin post insulator 20 KV 3 bh Material PLN
F Neck Plastic Top Ties Semicon A3C_S 150 mm2 3 bh 167,600 502,800
Travers dudukan fuse cut out/Arrester UNP 10 x 2000 mm 1 bh 1,054,400 1,054,400
Travers dudukan fuse cut out/Arrester UNP 10 x 2400 mm 2 bh 1,352,200 2,704,400
Besi L panjang 700 mm, 50x50x5mm. 1 bh 193,800 193,800
double beugel khusus 2 bh 121,200 242,400
Mur Baut 1/2" x 50 mm 10 bh 17,000 170,000
Bolt double arming 5/8" x350 mm 1 bh 67,000 67,000
Penghalang panjat 1 bh 220,000 220,000
Papan tanda kilat/ Tanda bahaya 1 bh 110,000 110,000
Stainless Steel strap 2 mtr 34,600 69,200
Stopping Buckle Stainless Steel 2 bh 10,000 20,000
b. Pemasangan 1 set 5,043,200 5,043,200
JUMLAH Rp. 10,397,200
11 Pems.pembesian & isolator tumpu gd 20KV 3 PH Consul UNP 10 3pl pd t.btn
a. Material Utama
Pin post insulator 20 KV 6 bh Material PLN
F Neck Plastic Double Side Ties Semicon A3C_S 70 mm2 3 Set 225,200 675,600
Travers dudukan fuse cut out/Arrester UNP 10 x 2000 mm 2 bh 1,054,400 2,108,800
Travers dudukan fuse cut out/Arrester UNP 10 x 2400 mm 2 bh 1,352,200 2,704,400
Bolt double arming 5/8" x350 mm 5 bh 67,000 335,000
Besi L panjang 700 mm, 50x50x5mm. 2 bh 193,800 387,600
double beugel khusus 2 set 121,200 242,400
Mur Baut 1/2" x 50 mm 12 bh 17,000 204,000
Penghalang panjat 1 bh 220,000 220,000
Papan tanda kilat/ Tanda bahaya 1 bh 110,000 110,000
Stainless Steel strap 2 mtr 34,600 69,200
Stopping Buckle Stainless Steel 2 bh 10,000 20,000
b. Pemasangan 1 set 8,898,800 8,898,800
JUMLAH Rp. 15,975,800
12 Pems.pembesian & isolator aspan gd 20KV 3 PH Consul UNP 10 3pl pd t.btn
a. Material Utama
Isolator tarik 20 KV lengkap accessories type suspension 6 set Material PLN
Pin post insulator 20 KV 1 bh Material PLN
F Neck Plastic Top Ties Semicon A3C_S 70 mm2 1 bh 158,800 158,800
Compression tension joint AAAC 70 mm2 3 bh 120,800 362,400
Travers dudukan fuse cut out/Arrester UNP 10 x 2000 mm 2 bh 1,054,400 2,108,800
Travers dudukan fuse cut out/Arrester UNP 10 x 2400 mm 2 bh 1,352,200 2,704,400
Bolt double arming 5/8" x350 mm 5 bh 67,000 335,000
Mur Baut 5/8" x 250 mm 0 bh 83,400 -
Besi L panjang 700 mm, 50x50x5mm. 2 bh 193,800 387,600

halaman : 4
HARGA PENAWARAN PER PAKET PEKERJAAN CLUSTER PROPINSI SULAWESI BARAT PT ..........
PERHITUNGAN BIAYA PEMBANGUNAN JTM, JTR DAN Gardu Distribusi JASKONHAR JTM JTR GD 2022
TIDAK TERMASUK HARGA MATERIAL DISTRIBUSI UTAMA (MDU)

VOLUME/PENGADAAN
HARGA PENAWARAN

No. URAIAN KEGIATAN PLN REKANAN JUMLAH HARGA


SAT HARGA SATUAN
(MDU) (NON MDU) (g=fxd)

(Rp) (Rp)
a b c d e f g
Mur Baut 1/2" x 50 mm 12 bh 17,000 204,000
double beugel khusus 1 bh 121,200 121,200
Penghalang panjat 1 bh 220,000 220,000
Papan tanda kilat/ Tanda bahaya 2 mtr 110,000 220,000
Stainless Steel strap 2 bh 34,600 69,200
Stopping Buckle Stainless Steel 2 set 10,000 20,000
b. Pemasangan 1 set 4,597,600 4,597,600
JUMLAH Rp. 11,509,000
13 Pems.pembesian & isolator aspan gd 20KV 3 PH Consul UNP 10 3pl t. ujung pd t.btn
a. Material Utama
Isolator tarik 20 KV lengkap accessories type suspension 3 set Material PLN
Travers dudukan fuse cut out/Arrester UNP 10 x 2000 mm 2 bh 1,054,400 2,108,800
Travers dudukan fuse cut out/Arrester UNP 10 x 2400 mm 2 bh 1,352,200 2,704,400
Bolt double arming 5/8" x350 mm 5 bh 67,000 335,000
Besi L panjang 700 mm, 50x50x5mm. 2 bh 193,800 387,600
Mur Baut 1/2" x 50 mm 12 bh 17,000 204,000
Penghalang panjat 1 bh 220,000 220,000
Papan tanda kilat/ Tanda bahaya 1 bh 110,000 110,000
Stainless Steel strap 2 mtr 34,600 69,200
Stopping Buckle Stainless Steel 2 bh 10,000 20,000
double beugel khusus 2 set 121,200 242,400
b. Pemasangan 1 set 2,241,800 2,241,800
JUMLAH Rp. 8,643,200
14 Pems.pembesian & isolator aspan gd (60° - 90°/AU2x) 20KV 3 PH Consul UNP 10 3pl t. ujung pd t.btn
a. Material Utama
Isolator tarik 20 KV lengkap accessories type suspension 6 set Material PLN
Pin post insulator 20 KV 2 bh Material PLN
F Neck Plastic Top Ties Semicon A3C_S 70 mm2 2 bh 158,800 317,600
Compression tension joint AAAC 70 mm2 3 bh 120,800 362,400
Travers dudukan fuse cut out/Arrester UNP 10 x 2000 mm 4 bh 1,054,400 4,217,600
Travers dudukan fuse cut out/Arrester UNP 10 x 2400 mm 2 bh 1,352,200 2,704,400
Bolt double arming 5/8" x350 mm 8 bh 67,000 536,000
Besi L panjang 700 mm, 50x50x5mm. 4 bh 193,800 775,200
Mur Baut 1/2" x 50 mm 16 bh 17,000 272,000
Penghalang panjat 1 bh 220,000 220,000
Papan tanda kilat/ Tanda bahaya 1 bh 110,000 110,000
Stainless Steel strap 2 mtr 34,600 69,200
Stopping Buckle Stainless Steel 2 bh 10,000 20,000
double beugel khusus 2 set 121,200 242,400
b. Pemasangan 1 set 6,377,400 6,377,400
JUMLAH Rp. 16,224,200
15 Pems.pembesian & isolator afspan tgl 20KV 3PH UNP 10 3pl pd t.btn
a. Material Utama
Isolator tarik 20 KV lengkap accessories type suspension 3 set Material PLN
Pin post insulator 20 KV 1 set Material PLN
F Neck Plastic Top Ties Semicon A3C_S 150 mm2 1 167,600 167,600
Compression tension joint AAAC 150 mm2 3 bh 200,000 600,000
Travers dudukan fuse cut out/Arrester UNP 10 x 2000 mm 2 bh 1,054,400 2,108,800
Mur Baut 5/8" x 350mm 2 bh 32,700 65,400
Mur Baut 5/8" x 250 mm 3 bh 83,400 250,200
Besi L panjang 700 mm, 50x50x5mm. 2 bh 193,800 387,600
Mur Baut 1/2" x 50 mm 2 bh 17,000 34,000
Penghalang panjat 1 bh 220,000 220,000
Papan tanda kilat/ Tanda bahaya 1 bh 110,000 110,000
Stainless Steel strap 1 mtr 34,600 34,600
Stopping Buckle Stainless Steel 1 bh 10,000 10,000
b. Pemasangan 1 set 1,896,600 1,896,600
JUMLAH Rp. 5,884,800
16 Pems.pembesian & isolator afspan gd type H 20KV 3PH UNP 10 3pl pd t.btn
a. Material Utama
Isolator tarik 20 KV lengkap accessories type suspension 6 set Material PLN
Pin post insulator 20 KV 2 set Material PLN
F Neck Plastic Top Ties Semicon A3C_S 150 mm2 2 bh 167,600 335,200
Compression tension joint AAAC 150 mm2 3 bh 200,000 600,000
Travers dudukan fuse cut out/Arrester UNP 10 x 2400 mm 2 bh 1,352,200 2,704,400
Bolt double arming 5/8" x350 mm 5 bh 67,000 335,000
Besi L panjang 700 mm, 50x50x5mm. 4 bh 193,800 775,200
Mur Baut 5/8" x 300 mm 1 bh 94,000 94,000
Mur Baut 1/2" x 50 mm 4 bh 17,000 68,000
Penghalang panjat 2 bh 220,000 440,000
Papan tanda kilat/ Tanda bahaya 2 bh 110,000 220,000
b. Pemasangan 1 set 4,745,200 4,745,200
JUMLAH Rp. 10,317,000
17 Pems.pembesian & isolator afspan gd 20KV 3PH UNP 10 3pl pd t.btn
a. Material Utama
Isolator tarik 20 KV lengkap accessories type suspension 6 set Material PLN
Pin post insulator 20 KV 1 bh Material PLN
F Neck Plastic Top Ties Semicon A3C_S 150 mm2 1 buah 167,600 167,600
Compression tension joint AAAC 150 mm2 3 bh 200,000 600,000
Heatshrink / Isolasi Bakar Hitam/warna 150mm 3 bh 83,200 249,600
Travers dudukan fuse cut out/Arrester UNP 10 x 2000 mm 2 bh 1,054,400 2,108,800
Bolt double arming 5/8" x350 mm 3 bh 67,000 201,000
Besi L panjang 700 mm, 50x50x5mm. 2 bh 193,800 387,600
Mur Baut 5/8" x 300 mm 1 bh 94,000 94,000
Mur Baut 1/2" x 50 mm 2 bh 17,000 34,000
Penghalang panjat 1 bh 220,000 220,000
Papan tanda kilat/ Tanda bahaya 1 bh 110,000 110,000
b. Pemasangan 1 set 3,586,400 3,586,400

halaman : 5
HARGA PENAWARAN PER PAKET PEKERJAAN CLUSTER PROPINSI SULAWESI BARAT PT ..........
PERHITUNGAN BIAYA PEMBANGUNAN JTM, JTR DAN Gardu Distribusi JASKONHAR JTM JTR GD 2022
TIDAK TERMASUK HARGA MATERIAL DISTRIBUSI UTAMA (MDU)

VOLUME/PENGADAAN
HARGA PENAWARAN

No. URAIAN KEGIATAN PLN REKANAN JUMLAH HARGA


SAT HARGA SATUAN
(MDU) (NON MDU) (g=fxd)

(Rp) (Rp)
a b c d e f g
JUMLAH Rp. 7,759,000

halaman : 6
HARGA PENAWARAN PER PAKET PEKERJAAN CLUSTER PROPINSI SULAWESI BARAT PT ..........
PERHITUNGAN BIAYA PEMBANGUNAN JTM, JTR DAN Gardu Distribusi JASKONHAR JTM JTR GD 2022
TIDAK TERMASUK HARGA MATERIAL DISTRIBUSI UTAMA (MDU)

VOLUME/PENGADAAN
HARGA PENAWARAN

No. URAIAN KEGIATAN PLN REKANAN JUMLAH HARGA


SAT HARGA SATUAN
(MDU) (NON MDU) (g=fxd)

(Rp) (Rp)
a b c d e f g
18 Pems.pembesian & isolator afspan tunggal 20KV 3PH UNP 10 t.ujung t.btn
a. Material Utama
Isolator tarik 20 KV lengkap accessories type suspension 3 set Material PLN
Pin post insulator 20 KV bh Material PLN
F Neck Plastic Top Ties Semicon A3C_S 150 mm2 0 bh 167,600 -
Compression tension joint AAAC 150 mm2 0 bh 200,000 -
Travers dudukan fuse cut out/Arrester UNP 10 x 2000 mm 2 bh 1,054,400 2,108,800
Bolt double arming 5/8" x350 mm 3 bh 67,000 201,000
Mur Baut 5/8" x 300 mm 1 bh 94,000 94,000
Mur Baut 1/2" x 50 mm 2 bh 17,000 34,000
Besi L panjang 700 mm, 50x50x5mm. 2 bh 193,800 387,600
Penghalang panjat 1 bh 220,000 220,000
Papan tanda kilat/ Tanda bahaya 1 bh 110,000 110,000
b. Pemasangan 1 set 1,602,000 1,602,000
JUMLAH Rp. 4,757,400
19 Pems.pembesian & isolator aspan gd (60° - 90°/AU2x) 20KV 3 PH UNP 10 3pl t.ujung pd t.btn
a. Material Utama
Isolator tarik 20 KV lengkap accessories type suspension 6 set Material PLN
Pin post insulator 20 KV 2 bh Material PLN
F Neck Plastic Top Ties Semicon A3C_S 70 mm2 2 bh 158,800 317,600
Compression tension joint AAAC 70 mm2 3 bh 120,800 362,400
Travers dudukan fuse cut out/Arrester UNP 10 x 2000 mm 4 bh 1,054,400 4,217,600
Bolt double arming 5/8" x350 mm 6 bh 67,000 402,000
Mur Baut 5/8" x 300 mm 2 bh 94,000 188,000
Mur Baut 1/2" x 50 mm 4 bh 17,000 68,000
Besi L panjang 700 mm, 50x50x5mm. 4 bh 193,800 775,200
Penghalang panjat 1 bh 220,000 220,000
Papan tanda kilat/ Tanda bahaya 1 bh 110,000 110,000
b. Pemasangan 1 set 5,503,600 5,503,600
JUMLAH Rp. 12,164,400
20 Pems.pembesian & isolator tumpu Tgl 20KV 3 PH UNP 10 3pl pd t.besi
a. Material Utama
Pin post insulator 20 KV 3 bh Material PLN
F Neck Plastic Top Ties Semicon A3C_S 150 mm2 3 bh 167,600 502,800
Travers dudukan fuse cut out/Arrester UNP 10 x 2000 mm 1 bh 1,054,400 1,054,400
Besi L panjang 700 mm, 50x50x5mm. 1 bh 193,800 193,800
Mur Baut 5/8" x 300 mm 0 bh 94,000 -
Mur Baut 1/2" x 50 mm 4 bh 17,000 68,000
double beugel khusus 1 bh 121,200 121,200
Beugel + mur baut 1 bh 142,800 142,800
Penghalang panjat 1 bh 220,000 220,000
Papan tanda kilat/ Tanda bahaya 1 bh 110,000 110,000
b. Pemasangan 1 set 4,032,000 4,032,000
JUMLAH Rp. 6,445,000
21 Pems.pembesian & isolator tumpu gd 20KV 3 PH UNP 10 3pl pd.t.besi
a. Material Utama
Pin post insulator 20 KV 6 bh Material PLN
F Neck Plastic Top Ties Semicon A3C_S 70 mm2 3 Set 158,800 476,400
Travers dudukan fuse cut out/Arrester UNP 10 x 2000 mm 2 bh 1,054,400 2,108,800
Besi L panjang 700 mm, 50x50x5mm. 2 bh 193,800 387,600
Bolt double arming 5/8" x350 mm 4 bh 67,000 268,000
Mur Baut 5/8" x 300 mm 0 bh 94,000 -
Mur Baut 1/2" x 50 mm 6 bh 17,000 102,000
double beugel khusus 1 bh 121,200 121,200
Penghalang panjat 1 bh 220,000 220,000
Papan tanda kilat/ Tanda bahaya 1 bh 110,000 110,000
Stainless Steel strap 2 mtr 34,600 69,200
Stopping Buckle Stainless Steel 2 bh 10,000 20,000
b. Pemasangan 1 set 7,887,600 7,887,600
JUMLAH Rp. 11,770,800
22 Pems.pembesian & isolator afspan tgl 20KV 3PH UNP 10 3pl pd t.besi
a. Material Utama
Isolator tarik 20 KV lengkap accessories type suspension 3 set Material PLN
Pin post insulator 20 KV 1 set Material PLN
Besi L panjang 700 mm, 50x50x5mm. 1 set 193,800 193,800
Compression tension joint AAAC 150 mm2 3 bh 200,000 600,000
Travers dudukan fuse cut out/Arrester UNP 10 x 2000 mm 1 bh 1,054,400 1,054,400
double beugel khusus 1 bh 121,200 121,200
Beugel + mur baut 1 bh 142,800 142,800
Mur Baut 5/8" x 300 mm 0 bh 94,000 -
Mur Baut 1/2" x 50 mm 4 bh 17,000 68,000
Penghalang panjat 1 bh 220,000 220,000
Papan tanda kilat/ Tanda bahaya 1 bh 110,000 110,000
Stainless Steel strap 2 mtr 34,600 69,200
Stopping Buckle Stainless Steel 2 bh 10,000 20,000
b. Pemasangan 1 set 1,222,800 1,222,800
JUMLAH Rp. 3,822,200

halaman : 7
HARGA PENAWARAN PER PAKET PEKERJAAN CLUSTER PROPINSI SULAWESI BARAT PT ..........
PERHITUNGAN BIAYA PEMBANGUNAN JTM, JTR DAN Gardu Distribusi JASKONHAR JTM JTR GD 2022
TIDAK TERMASUK HARGA MATERIAL DISTRIBUSI UTAMA (MDU)

VOLUME/PENGADAAN
HARGA PENAWARAN

No. URAIAN KEGIATAN PLN REKANAN JUMLAH HARGA


SAT HARGA SATUAN
(MDU) (NON MDU) (g=fxd)

(Rp) (Rp)
a b c d e f g
23 Pems.pembesian & isolator afspan gd 20KV 3PH UNP 10 3pl pd t.besi
a. Material Utama
Isolator tarik 20 KV lengkap accessories type suspension 6 set Material PLN
Pin post insulator 20 KV 1 bh Material PLN
F Neck Plastic Top Ties Semicon A3C_S 150 mm2 1 bh 167,600 167,600
Compression tension joint AAAC 150 mm2 3 bh 200,000 600,000
Travers dudukan fuse cut out/Arrester UNP 10 x 2000 mm 2 bh 1,054,400 2,108,800
Besi L panjang 700 mm, 50x50x5mm. 2 bh 193,800 387,600
Bolt double arming 5/8" x350 mm 4 bh 67,000 268,000
double beugel khusus 1 set 121,200 121,200
Mur Baut 5/8" x 300 mm 0 bh 94,000 -
Mur Baut 1/2" x 50 mm 6 bh 17,000 102,000
Bolt double arming 5/8" x50 mm 0 bh 27,200 -
Penghalang panjat 1 bh 220,000 220,000
Papan tanda kilat/ Tanda bahaya 1 bh 110,000 110,000
Stainless Steel strap 2 mtr 34,600 69,200
Stopping Buckle Stainless Steel 2 bh 10,000 20,000
b. Pemasangan 1 set 3,207,200 3,207,200
JUMLAH Rp. 7,381,600
24 Pems.pembesian & isolator afspan gd 20KV 3PH UNP 10 t.ujung t.besi
a. Material Utama
Isolator tarik 20 KV lengkap accessories type suspension 3 set Material PLN
Pin post insulator 20 KV 0 bh Material PLN
F Neck Plastic Top Ties Semicon A3C_S 150 mm2 0 bh 167,600 -
Compression tension joint AAAC 150 mm2 0 bh 200,000 -
Travers dudukan fuse cut out/Arrester UNP 10 x 2000 mm 2 bh 1,054,400 2,108,800
Besi L panjang 700 mm, 50x50x5mm. 2 bh 193,800 387,600
Bolt double arming 5/8" x350 mm 4 bh 67,000 268,000
double beugel khusus 1 bh 121,200 121,200
Mur Baut 5/8" x 300 mm 0 bh 94,000 -
Mur Baut 1/2" x 50 mm 6 bh 17,000 102,000
Penghalang panjat 1 bh 220,000 220,000
Papan tanda kilat/ Tanda bahaya 1 bh 110,000 110,000
Stainless Steel strap 2 mtr 34,600 69,200
Stopping Buckle Stainless Steel 2 bh 10,000 20,000
b. Pemasangan 1 set 1,602,000 1,602,000
JUMLAH Rp. 5,008,800
25 Pems.pembesian & isolator afspan gd (60° - 90°/AU2x) 20KV 3PH UNP 10 t.ujung t.besi
a. Material Utama
Isolator tarik 20 KV lengkap accessories type suspension 6 set Material PLN
Pin post insulator 20 KV 2 bh Material PLN
F Neck Plastic Top Ties Semicon A3C_S 70 mm2 2 bh 158,800 317,600
Compression tension joint AAAC 70 mm2 3 bh 120,800 362,400
Travers dudukan fuse cut out/Arrester UNP 10 x 2000 mm 4 bh 1,054,400 4,217,600
Besi L panjang 700 mm, 50x50x5mm. 4 bh 193,800 775,200
Bolt double arming 5/8" x350 mm 4 bh 67,000 268,000
double beugel khusus 2 bh 121,200 242,400
Mur Baut 5/8" x 250 mm 0 bh 83,400 -
Mur Baut 1/2" x 50 mm 12 bh 17,000 204,000
Penghalang panjat 1 bh 220,000 220,000
Papan tanda kilat/ Tanda bahaya 1 bh 110,000 110,000
Stainless Steel strap 2 mtr 34,600 69,200
Stopping Buckle Stainless Steel 2 bh 10,000 20,000
b. Pemasangan 1 set 5,503,600 5,503,600
JUMLAH Rp. 12,310,000
26 Pems.pembesian & isolator afspan gd 20KV 3PH UNP 10 Tipe H t. besi
a. Material Utama
Isolator tarik 20 KV lengkap accessories type suspension 6 set Material PLN
Pin post insulator 20 KV 2 bh Material PLN
F Neck Plastic Top Ties Semicon A3C_S 70 mm2 2 bh 158,800 317,600
Compression tension joint AAAC 70 mm2 3 bh 120,800 362,400
Travers dudukan fuse cut out/Arrester UNP 10 x 2400 mm 2 bh 1,352,200 2,704,400
Besi L panjang 700 mm, 50x50x5mm. 4 bh 193,800 775,200
Bolt double arming 5/8" x350 mm 5 bh 67,000 335,000
Bolt double arming 5/8" x50 mm 0 bh 27,200 -
Mur Baut 5/8" x 250 mm 0 bh 83,400 -
Mur Baut 1/2" x 50 mm 12 bh 17,000 204,000
double beugel khusus 2 bh 121,200 242,400
Penghalang panjat 2 bh 220,000 440,000
Papan tanda kilat/ Tanda bahaya 2 bh 110,000 220,000
Stainless Steel strap 3 mtr 34,600 103,800
Stopping Buckle Stainless Steel 4 bh 10,000 40,000
b. Pemasangan 1 set 4,921,600 4,921,600
JUMLAH Rp. 10,666,400
27 Pems.pembesian & isolator tumpu Tgl 20KV 3 PH Consul UNP 10 3pl pd t.besi
a. Material Utama
Pin post insulator 20 KV 3 bh Material PLN
F Neck Plastic Top Ties Semicon A3C_S 70 mm2 3 bh 158,800 476,400
Travers dudukan fuse cut out/Arrester UNP 10 x 2000 mm 1 bh 1,054,400 1,054,400
Travers dudukan fuse cut out/Arrester UNP 10 x 2400 mm 2 bh 1,352,200 2,704,400

halaman : 8
HARGA PENAWARAN PER PAKET PEKERJAAN CLUSTER PROPINSI SULAWESI BARAT PT ..........
PERHITUNGAN BIAYA PEMBANGUNAN JTM, JTR DAN Gardu Distribusi JASKONHAR JTM JTR GD 2022
TIDAK TERMASUK HARGA MATERIAL DISTRIBUSI UTAMA (MDU)

VOLUME/PENGADAAN
HARGA PENAWARAN

No. URAIAN KEGIATAN PLN REKANAN JUMLAH HARGA


SAT HARGA SATUAN
(MDU) (NON MDU) (g=fxd)

(Rp) (Rp)
a b c d e f g
Besi L panjang 700 mm, 50x50x5mm. 1 bh 193,800 193,800
Mur Baut 1/2" x 50 mm 10 bh 17,000 170,000
double beugel khusus 2 bh 121,200 242,400
Beugel + mur baut 0 bh 142,800 -
Penghalang panjat 1 bh 220,000 220,000
Papan tanda kilat/ Tanda bahaya 1 bh 110,000 110,000
Stainless Steel strap 2 mtr 34,600 69,200
Stopping Buckle Stainless Steel 2 bh 10,000 20,000
b. Pemasangan 1 set 5,043,200 5,043,200
JUMLAH Rp. 10,303,800
28 Pems.pembesian & isolator tumpu gd 20KV 3 PH Consul UNP 10 3pl pd.t.besi
a. Material Utama
Pin post insulator 20 KV 6 bh Material PLN
F Neck Plastic Top Ties Semicon A3C_S 70 mm2 3 Set 158,800 476,400
Travers dudukan fuse cut out/Arrester UNP 10 x 2000 mm 2 bh 1,054,400 2,108,800
Travers dudukan fuse cut out/Arrester UNP 10 x 2400 mm 2 bh 1,352,200 2,704,400
Besi L panjang 700 mm, 50x50x5mm. 2 bh 193,800 387,600
Bolt double arming 5/8" x350 mm 5 bh 67,000 335,000
Mur Baut 1/2" x 50 mm 12 bh 17,000 204,000
double beugel khusus 2 bh 121,200 242,400
Penghalang panjat 1 bh 220,000 220,000
Papan tanda kilat/ Tanda bahaya 1 bh 110,000 110,000
Stainless Steel strap 2 mtr 34,600 69,200
Stopping Buckle Stainless Steel 2 bh 10,000 20,000
b. Pemasangan 1 set 8,898,800 8,898,800
JUMLAH Rp. 15,776,600
29 Pems.pembesian & isolator aspan gd 20KV 3 PH Consul UNP 10 3pl pd t.besi
a. Material Utama
Isolator tarik 20 KV lengkap accessories type suspension 6 set Material PLN
Pin post insulator 20 KV 1 bh Material PLN
F Neck Plastic Top Ties Semicon A3C_S 70 mm2 1 bh 158,800 158,800
Compression tension joint AAAC 70 mm2 3 bh 120,800 362,400
Travers dudukan fuse cut out/Arrester UNP 10 x 2000 mm 2 bh 1,054,400 2,108,800
Travers dudukan fuse cut out/Arrester UNP 10 x 2400 mm 2 bh 1,352,200 2,704,400
Bolt double arming 5/8" x350 mm 5 bh 67,000 335,000
Besi L panjang 700 mm, 50x50x5mm. 2 bh 193,800 387,600
Mur Baut 1/2" x 50 mm 12 bh 17,000 204,000
double beugel khusus 1 bh 121,200 121,200
Penghalang panjat 1 bh 220,000 220,000
Papan tanda kilat/ Tanda bahaya 2 mtr 110,000 220,000
Stainless Steel strap 2 bh 34,600 69,200
Stopping Buckle Stainless Steel 2 set 10,000 20,000
b. Pemasangan 1 set 4,597,600 4,597,600
JUMLAH Rp. 11,509,000
30 Pems.pembesian & isolator aspan Gd 20KV 3 PH Consul UNP 10 3pl t.ujung pd t.besi
a. Material Utama
Isolator tarik 20 KV lengkap accessories type suspension 3 set Material PLN
Travers dudukan fuse cut out/Arrester UNP 10 x 2000 mm 2 bh 1,054,400 2,108,800
Travers dudukan fuse cut out/Arrester UNP 10 x 2400 mm 2 bh 1,352,200 2,704,400
Bolt double arming 5/8" x350 mm 5 bh 67,000 335,000
Besi L panjang 700 mm, 50x50x5mm. 2 bh 193,800 387,600
Mur Baut 1/2" x 50 mm 12 bh 17,000 204,000
double beugel khusus 1 bh 121,200 121,200
Penghalang panjat 1 bh 220,000 220,000
Papan tanda kilat/ Tanda bahaya 2 mtr 110,000 220,000
Stainless Steel strap 2 bh 34,600 69,200
Stopping Buckle Stainless Steel 2 set 10,000 20,000
b. Pemasangan 1 set 2,613,200 2,613,200
JUMLAH Rp. 9,003,400
31 Pems.pembesian & isolator aspan gd (60° - 90°/AU2x) 20KV 3 PH Consul UNP 10 3pl t. ujung pd t.btn
a. Material Utama
Isolator tarik 20 KV lengkap accessories type suspension 6 set Material PLN
Pin post insulator 20 KV 2 bh Material PLN
F Neck Plastic Top Ties Semicon A3C_S 70 mm2 2 bh 158,800 317,600
Compression tension joint AAAC 70 mm2 3 bh 120,800 362,400
Travers dudukan fuse cut out/Arrester UNP 10 x 2000 mm 4 bh 1,054,400 4,217,600
Travers dudukan fuse cut out/Arrester UNP 10 x 2400 mm 2 bh 1,352,200 2,704,400
Bolt double arming 5/8" x350 mm 8 bh 67,000 536,000
Besi L panjang 700 mm, 50x50x5mm. 4 bh 193,800 775,200
Mur Baut 1/2" x 50 mm 16 bh 17,000 272,000
double beugel khusus 1 bh 121,200 121,200
Penghalang panjat 1 bh 220,000 220,000
Papan tanda kilat/ Tanda bahaya 2 mtr 110,000 220,000
Stainless Steel strap 2 bh 34,600 69,200
Stopping Buckle Stainless Steel 2 set 10,000 20,000
b. Pemasangan 1 set 5,468,400 5,468,400
JUMLAH Rp. 15,304,000

halaman : 9
HARGA PENAWARAN PER PAKET PEKERJAAN CLUSTER PROPINSI SULAWESI BARAT PT ..........
PERHITUNGAN BIAYA PEMBANGUNAN JTM, JTR DAN Gardu Distribusi JASKONHAR JTM JTR GD 2022
TIDAK TERMASUK HARGA MATERIAL DISTRIBUSI UTAMA (MDU)

VOLUME/PENGADAAN
HARGA PENAWARAN

No. URAIAN KEGIATAN PLN REKANAN JUMLAH HARGA


SAT HARGA SATUAN
(MDU) (NON MDU) (g=fxd)

(Rp) (Rp)
a b c d e f g
32 Pemancangan tiang besi 11 meter
a. Material Utama
- Tiang besi 11 meter 1 btg Material PLN
b. Pemasangan
- Penggalian tanah untuk pemancagan tiang TM (tanah) 1 lbg 328,000 328,000
- Penggonian tiang 11 1 btg 466,600 466,600
- Pemancangan tiang besi 11-14 meter 1 btg 516,200 516,200
- Pembetonan selubung tiang besi 9-11 mm 1 btg - -
- Pengecatan tiang besi TM + Material 1 btg 17,600 17,600
JUMLAH Rp. 1,328,400
33 Pemancangan tiang besi 11 meter
a. Material Utama
- Tiang besi 11 meter 1 btg Material PLN
b. Pemasangan
- Galian/pembuatan lubang ( Tanah Berbatu ) 1 lbg 739,200 739,200
- Memantel tiang (penggonian + selubung beton type C) + bahan 1 btg 2,597,400 2,597,400
- Pemancangan dan pengecatan + bahan 1 btg 516,200 516,200
JUMLAH Rp. 3,852,800
34 Pemancangan tiang besi 12 meter
a. Material Utama
- Tiang besi 12 meter 1 btg Material PLN
b. Pemasangan
- Galian/pembuatan lubang 1 lbg 328,000 328,000
- Memantel tiang (penggonian + selubung beton type C) + bahan 1 btg 2,617,800 2,617,800
- Pemancangan dan pengecatan + bahan 1 btg 516,200 516,200
JUMLAH Rp. 3,462,000
35 Pemancangan tiang besi 12 meter
a. Material Utama
- Tiang besi 12 meter 1 btg Material PLN
b. Pemasangan
- Galian/pembuatan lubang ( Tanah Berbatu ) 1 lbg 739,200 739,200
- Memantel tiang (penggonian + selubung beton type C) + bahan 1 btg 2,597,400 2,597,400
- Pemancangan dan pengecatan + bahan 1 btg 516,200 516,200
JUMLAH Rp. 3,852,800
36 Pemancangan tiang besi 13 meter
a. Material Utama
- Tiang besi 13 meter 1 btg Material PLN
b. Pemasangan
- Galian/pembuatan lubang 1 lbg 328,000 328,000
- Memantel tiang (penggonian + selubung beton type C) + bahan 1 btg 2,617,800 2,617,800
- Pemancangan dan pengecatan + bahan 1 btg 516,200 516,200
JUMLAH Rp. 3,462,000
37 Pemancangan tiang besi 13 meter
a. Material Utama
- Tiang besi 13 meter 1 btg Material PLN
b. Pemasangan
- Galian/pembuatan lubang ( Tanah Berbatu ) 1 lbg 739,200 739,200
- Memantel tiang (penggonian + selubung beton type C) + bahan 1 btg 2,597,400 2,597,400
- Pemancangan dan pengecatan + bahan 1 btg 516,200 516,200
JUMLAH Rp. 3,852,800
38 Pemancangan tiang besi 9 meter
a. Material Utama
- Tiang besi 9 meter 1 btg Material PLN
b. Pemasangan
- Galian/pembuatan lubang 1 lbg 272,600 272,600
- Memantel tiang (penggonian + selubung beton type C) + bahan 1 btg 7,182,000 7,182,000
- Pemancangan dan pengecatan + bahan 1 btg 976,400 976,400
JUMLAH Rp. 8,431,000
39 Pemancangan tiang besi 9 meter
a. Material Utama
- Tiang besi 9 meter 1 btg Material PLN
b. Pemasangan
- Galian/pembuatan lubang ( Tanah Berbatu ) 1 lbg 739,200 739,200
- Memantel tiang (penggonian + selubung beton type C) + bahan 1 btg 7,182,000 7,182,000
- Pemancangan dan pengecatan + bahan 1 btg 976,400 976,400
JUMLAH Rp. 8,897,600
40 Pemasangan tupang tarik tiang beton.
a. Material Utama
Guy Insulator 12 kV 1 bh 119,400 119,400
Double beugel + Mur Baut Mata + Eye Bolt 1 set 184,200 184,200
Turn Buckle Medium /Span scroef 5/8" 1 bh 95,800 95,800
Plat beton bertulang 40x40x10 cm 1 bh 110,200 110,200
Angker rod + klem penyambung + mur baut 1 bh 143,800 143,800
U - klem 35 - 50 mm 8 bh 17,600 140,800
Kaos baja / Thimble TM 5/8" 2 bh 34,600 69,200
Galvanized Steel Wire 35 mm2 15 mtr 24,400 366,000
b. Pemasangan 1 set 706,600 706,600
JUMLAH Rp. 1,936,000

halaman : 10
HARGA PENAWARAN PER PAKET PEKERJAAN CLUSTER PROPINSI SULAWESI BARAT PT ..........
PERHITUNGAN BIAYA PEMBANGUNAN JTM, JTR DAN Gardu Distribusi JASKONHAR JTM JTR GD 2022
TIDAK TERMASUK HARGA MATERIAL DISTRIBUSI UTAMA (MDU)

VOLUME/PENGADAAN
HARGA PENAWARAN

No. URAIAN KEGIATAN PLN REKANAN JUMLAH HARGA


SAT HARGA SATUAN
(MDU) (NON MDU) (g=fxd)

(Rp) (Rp)
a b c d e f g
41 Pemasangan tupang tarik tiang besi.
a. Material Utama
Guy Insulator 12 kV 1 bh 119,400 119,400
Double beugel + Mur Baut Mata + Eye Bolt 1 set 184,200 184,200
Turn Buckle Medium /Span scroef 5/8" 1 bh 95,800 95,800
Plat beton bertulang 40x40x10 cm 1 bh 110,200 110,200
Angker rod + klem penyambung + mur baut 1 bh 143,800 143,800
U - klem 35 - 50 mm 8 bh 17,600 140,800
Kaos baja / Thimble TM 5/8" 2 bh 34,600 69,200
Galvanized Steel Wire 35 mm2 15 mtr 24,400 366,000
b. Pemasangan 1 set 706,600 706,600
JUMLAH Rp. 1,936,000
42 Pemasangan tupang tarik khusus
a. Material Utama
Guy Insulator 12 kV 1 bh 119,400 119,400
Double beugel + Mur Baut Mata + Eye Bolt 1 set 184,200 184,200
Turn Buckle Medium /Span scroef 5/8" 1 bh 95,800 95,800
Plat beton bertulang 40x40x10 cm 1 bh 110,200 110,200
Angker rod + klem penyambung + mur baut 1 bh 143,800 143,800
U - klem 35 - 50 mm 8 bh 17,600 140,800
Kaos baja / Thimble TM 5/8" 2 bh 34,600 69,200
Galvanized Steel Wire 35 mm2 25 mtr 24,400 610,000
b. Pemasangan 1 set 706,600 706,600
JUMLAH Rp. 2,180,000
43 Pemasangan tupang tarik Kontra Mast
a. Material Utama
Guy Insulator 12 kV 1 bh 119,400 119,400
Double beugel + Mur Baut Mata + Eye Bolt 1 set 184,200 184,200
Turn Buckle Medium /Span scroef 5/8" 1 bh 95,800 95,800
Plat beton bertulang 40x40x10 cm 1 bh 110,200 110,200
Angker rod + klem penyambung + mur baut 1 bh 143,800 143,800
U - klem 35 - 50 mm 12 bh 17,600 211,200
Kaos baja / Thimble TM 5/8" 4 bh 34,600 138,400
Galvanized Steel Wire 35 mm2 15 mtr 24,400 366,000
Besi L panjang 700 mm, 50x50x5mm. 1 bh 193,800 193,800
double beugel khusus 1 bh 121,200 121,200
Mur Baut 1/2" x 50 mm 4 bh 17,000 68,000
b. Pemasangan 1 set 706,600 706,600
JUMLAH Rp. 2,458,600
44 Pemasangan tupang tarik dengan tiang bantu tiang beton.
a. Material Utama
Tiang beton 1 btg Material PLN
Guy Insulator 12 kV 1 bh 119,400 119,400
Double beugel + Mur Baut Mata + Eye Bolt 3 set 184,200 552,600
Turn Buckle Medium /Span scroef 5/8" 1 bh 95,800 95,800
Plat beton bertulang 40x40x10 cm 1 set 110,200 110,200
Angker rod + klem penyambung + mur baut 1 bh 143,800 143,800
U - klem 35 - 50 mm 12 bh 17,600 211,200
Kaos baja / Thimble TM 5/8" 4 bh 34,600 138,400
Galvanized Steel Wire 35 mm2 25 mtr 24,400 610,000
b. Pemasangan 1 set 1,953,600 1,953,600
JUMLAH Rp. 3,935,000
45 Pemasangan tupang tarik dengan tiang bantu tiang besi.
a. Material Utama
Tiang besi 9 meter 1 btg Material PLN
Guy Insulator 12 kV 1 bh 119,400 119,400
Double beugel + Mur Baut Mata + Eye Bolt 3 set 184,200 552,600
Turn Buckle Medium /Span scroef 5/8" 1 bh 95,800 95,800
Plat beton bertulang 40x40x10 cm 1 set 110,200 110,200
Angker rod + klem penyambung + mur baut 1 bh 143,800 143,800
U - klem 35 - 50 mm 12 bh 17,600 211,200
Kaos baja / Thimble TM 5/8" 4 bh 34,600 138,400
Galvanized Steel Wire 35 mm2 25 mtr 24,400 610,000
b. Pemasangan
Pemasangan Tupang tarik pada tiang bantu 1 set 1,953,600 1,953,600
Penggalian tanah untuk pemancagan tiang TM (tanah) 1 lbg 328,000 328,000
Pembetonan Tiang 12/200 Type C + Material 1 btg 2,151,200 2,151,200
Pengecatan tiang besi TM + Material 1 set 17,600 17,600
JUMLAH Rp. 6,431,800
46 Pemasangan tupang tekan
a. Material Utama
Tiang besi 11 meter 1 btg Material PLN
Double beugel / Clam Beugel 2 set 133,000 266,000
Beugel + mur baut 1 set 142,800 142,800
Sangga tupang tekan 1 bh 162,200 162,200
Plat beton bertulang 40x40x10 cm 1 bh 110,200 110,200
b. Pemasangan
Pemasangan Tupang tekan 1 lbg 1,394,000 1,394,000
Penggalian tanah untuk pemancagan tiang TM (tanah) 1 lbg 328,000 328,000
Pembetonan Tiang 12/200 Type C + Material 1 btg 2,151,200 2,151,200
Pengecatan tiang besi TM + Material 1 set 17,600 17,600
JUMLAH Rp. 4,572,000

halaman : 11
HARGA PENAWARAN PER PAKET PEKERJAAN CLUSTER PROPINSI SULAWESI BARAT PT ..........
PERHITUNGAN BIAYA PEMBANGUNAN JTM, JTR DAN Gardu Distribusi JASKONHAR JTM JTR GD 2022
TIDAK TERMASUK HARGA MATERIAL DISTRIBUSI UTAMA (MDU)

VOLUME/PENGADAAN
HARGA PENAWARAN

No. URAIAN KEGIATAN PLN REKANAN JUMLAH HARGA


SAT HARGA SATUAN
(MDU) (NON MDU) (g=fxd)

(Rp) (Rp)
a b c d e f g
47 Pemasangan LBS/Recloser
a. Material Utama
Recloser 20kV 1 set Material PLN
LBS Motorized + RTU 1 set Material PLN
Conductor AAAC-S;70mm2 31 set Material PLN
Conductor AAAC-S;150mm2 18 set Material PLN
Isolator Aspan;24kV;70kN 6 set Material PLN
LA Polymer SIR, 24 kV, 10 kA 6 set Material PLN
Fuse Cut Out, 24 Kv 2 set Material PLN

Travers/ Cross arm UNP 100 x 50 x 5 x 2000 mm 2 Buah 1,054,400 2,108,800


Tupang Travers/Cross arm/Besi Strip 2 Buah 118,000 236,000
Bolt double arming 5/8" x300 mm 4 Buah 61,800 247,200
Compression connector AL 70 - 150 mm2 ( CCO ) 8 Buah 50,200 401,600
Compression connector AL 150 - 150 mm2 ( CCO ) 6 Buah 55,800 334,800
Clamp C ( C Connector ) 50 - 70 mm2 2 Buah 78,800 157,600
Double beugel / Clam Beugel 2 Set 133,000 266,000
Terminal lugs /Sepatu Cable Cu 50 mm² 2 Buah 113,000 226,000
Kawat BC draad 50 mm² 27 Meter 138,200 3,731,400
Stainless Steel Strap 5 Meter 34,600 173,000
Stopping Buckle 5 Buah 6,400 32,000
Link 25 x 25 mm 10 Buah 6,200 62,000
Pipa galvanized 3" x 6.000 mm medium B 1 Buah 813,800 813,800
Pipa Arde 1,5 " x 3.000 mm lengkap 3 Set 960,600 2,881,800
Ground Rod + Clamp 5/8" x 2 mtr 3 Set 337,800 1,013,400
Papan tanda kilat/ Tanda bahaya 1 Buah 110,000 110,000
Terminal lugs /Sepatu Cable Bimetal (Al/Cu) 70 mm² 12 Buah 147,800 1,773,600
Terminal lugs /Sepatu Cable Bimetal (Al/Cu) 150 mm² (2 lubang) 6 Buah 220,000 1,320,000
Fuselink 2A 2 Buah - -
U - klem 35 - 50 mm 6 Buah 17,600 105,600
Knee PVC 3" 1 Buah 106,000 106,000
Compression tension joint AAAC 150 mm2 6 Buah 200,000 1,200,000

b. Pemasangan
Pemasangan LBS Motorized, recloser, FAI, PMCB ( lengkap assesories ) 1 set 11,577,600 11,577,600
JUMLAH Rp. 28,878,200
48 Pembongkaran LBS/Recloser
a. Pembongkaran
Pembongkaran LBS Motorized, recloser, FAI, PMCB ( lengkap assesories ) 1 set 1,279,906 2,582,600
Pembongkaran RTU 1 set 208,383 353,000
JUMLAH Rp. 2,935,600

B GARDU DISTRIBUSI
1 Pembangunan gardu tiang 1 phasa 20 kV (1 tiang).
a. Material Utama
Tiang 1 btg Material PLN
Trafo 1 phasa 25 kVA 20 kV 400/ 230 Volt 1 bh Material PLN
b. Konstruksi dudukan trafo 1 phasa
Kawat BC draad 50 mm² 25 mtr 138,200 3,455,000
Kawat AAAC/S 70 mm² 8 mtr Material PLN
Terminal lugs /Sepatu Cable Cu 50 mm² 6 bh 113,000 678,000
Terminal lugs /Sepatu Cable Bimetal (Al/Cu) 70 mm² 10 bh 147,800 1,478,000
Compression connector AL 70 - 150 mm2 ( CCO ) 2 bh 50,200 100,400
Dudukan gardu tiang 1 phasa cantol 1 set 2,619,400 2,619,400
Fuse cut out 20 kV 100 Amp + fuse link 3 Amp. 2 unit Material PLN
Fuselink 3A 2 bh - -
Pole mounthing brecket for FCO. 2 set Material PLN
24 kV lightning arrester 10 kA. 2 bh Material PLN
Pole mounthing brecket for LA. 2 set Material PLN
Travers dudukan fuse cut out/Arrester UNP 10 x 1.200 mm 2 bh 594,800 1,189,600
Beugel + mur baut 2 set 142,800 285,600
Mur Baut 5/8" x 250 mm 4 bh 83,400 333,600
Papan tanda kilat/ Tanda bahaya 1 bh 110,000 110,000
Ground Rod + Clamp 5/8" x 2 mtr 3 set 337,800 1,013,400
Unimax clamp 50 mm² / split bolt line tap for B27 3 bh 65,200 195,600
Tekep Isolator FCO bagian atas (untuk 1 phasa) 2 bh - -
Tekep Isolator FCO bagian bawah (untuk 1 phasa) 2 bh - -
Tekep Isolator Arester (untuk 1 phasa) 2 bh - -
Tekep Isolator Bushing TM dan TR Trafo (untuk 1 phasa) 2 bh - -
Tekep Isolator Bushing TM dan TR Trafo (untuk 1 phasa) 4 bh - -
c. Lemari bagi TR 1 phasa lengkap
Kotak lemari bagi 1 phasa 2 jurusan lengkap 1 tiang 1 set Material PLN
Rel tembaga 40 x 5 mm = 0.75
Dudukan rel tembaga = 6,00
NT fuse zise 1, 100 amp. = 4,00
Fuse base 250 Amp = 4,00
Lampu kontrol * MCB 2 Amp = 1 bh
* Bola lampu 40 W = 1 bh
* Stop kontak arde = 1 bh
* Saklar engkel outbow = 1 bh

halaman : 12
HARGA PENAWARAN PER PAKET PEKERJAAN CLUSTER PROPINSI SULAWESI BARAT PT ..........
PERHITUNGAN BIAYA PEMBANGUNAN JTM, JTR DAN Gardu Distribusi JASKONHAR JTM JTR GD 2022
TIDAK TERMASUK HARGA MATERIAL DISTRIBUSI UTAMA (MDU)

VOLUME/PENGADAAN
HARGA PENAWARAN

No. URAIAN KEGIATAN PLN REKANAN JUMLAH HARGA


SAT HARGA SATUAN
(MDU) (NON MDU) (g=fxd)

(Rp) (Rp)
a b c d e f g
* Kabel NYAF 1 x 2,5 mm = 3 mtr
Travers dudukan PHB TR 3 phasa lengkap (UNP 6,5 x 600 mm) 2 set 389,200 778,400
Beugel + mur baut 2 set 142,800 285,600
d. Pemasangan
Konstruksi gardu tiang 1 phasa (konstruksi dudukan trafo, cut out, lightning
1 set 5,427,400 5,427,400
arrester, pentanahan, lemari bagi, trafo).

JUMLAH Rp. 17,950,000


2 Pembangunan gardu tiang 3 phasa 20 kV (1 tiang) 25-50 kVA
a. Material Utama
TRF DIS;;20kV/400V;3P;25-50kVA;YZN5;OD 1 Material PLN
CUT OUT;20kV;6-100A;10kA;125kV 3 Material PLN
LA;20-24kV;K;10kA;;; 3 Material PLN
CABLE PWR;NYY;1X70mm2;0.6/1kV;OH 64 Material PLN
CABLE PWR;NYY;1X95mm2;0.6/1kV;OH 36 Material PLN
LVSB;DIST;3P;380V;250A;2LINE;OD 1 Material PLN
b. Konstruksi Dudukan FCO dan Arrester
Travers dudukan fuse cut out/Arrester UNP 10 x 2000 mm 2 Buah 1,054,400 2,108,800
Beugel + mur baut 2 Buah 142,800 285,600
Besi L panjang 700 mm, 50x50x5mm. 2 Buah 193,800 387,600
Double beugel khusus 2 Set 121,200 242,400
Mur Baut 5/8" x 50 mm 8 Buah 33,200 265,600
Penghalang panjat 1 Buah 220,000 220,000
Papan tanda kilat/ Tanda bahaya 1 Buah 110,000 110,000
c. Konstruksi Dudukan Trafo
Dudukan gardu tiang 3 phasa cantol 1 Set 4,283,800 4,283,800
Tanda bahaya di gardu 1 Buah 118,000 118,000
d. Konstruksi Dudukan PHBTR
Travers dudukan PHB TR 3 phasa lengkap (UNP 6,5 x 750 mm) 2 Buah 431,000 862,000
e. Konstruksi Pipa Kabel Opstyg
Pipa galvanized 3" x 6.000 mm medium B 3 Buah 813,800 2,441,400
Knee galvanized 3" 6 Buah 121,800 730,800
Beugel + mur baut pengikat pipa 3" + mur baut 6 Set 180,000 1,080,000
f. Konstruksi Kabel Jumper
Compression connector AL 70 - 150 mm2 ( CCO ) 3 Buah 50,200 150,600
Terminal lugs /Sepatu Cable Bimetal (Al/Cu) 70 mm² 15 Buah 147,800 2,217,000
Heatshrink / Isolasi Bakar Hitam/warna 70mm 15 Buah 55,400 831,000
Fuselink 8A 3 Buah - -
g. Konstruksi Kabel Opstyg
Terminal lugs /Sepatu Cable Cu 95 mm² 8 Buah 170,000 1,360,000
Heatshrink / Isolasi Bakar Hitam/warna 150mm 8 Buah 83,200 665,600
Terminal lugs /Sepatu Cable Cu 70 mm² 2 Buah 126,400 252,800
Heatshrink / Isolasi Bakar Hitam/warna 70mm 2 Buah 55,400 110,800
Bimetal compression joint ( AL / CU ) + Heatshrink 70 - 70 mm2 8 Buah 157,600 1,260,800
Plastic Strap For JTR (20 Cm) 4 Buah 4,800 19,200
h. Konstruksi Pentanahan
Terminal lugs /Sepatu Cable Cu 50 mm² 12 Buah 113,000 1,356,000
Ground Rod + Clamp 5/8 x 2,5 mtr 4 Set 394,000 1,576,000
Kawat BC draad 50 mm² 25 Meter 138,200 3,455,000
Pipa galvanized 1" x 3.000 mm medium B 2 Buah 154,000 308,000
Pipa galvanized 1" x 1.000 mm medium B 2 Buah 55,800 111,600
Stainless Steel Strap 6 Meter 34,600 207,600
Stopping Buckle 6 Buah 6,400 38,400
Link 25 x 25 mm 4 Buah 6,200 24,800
Tekep Isolator FCO bagian atas (untuk 1 phasa) 3 Set - -
Tekep Isolator FCO bagian bawah (untuk 1 phasa) 3 Set - -
Tekep Isolator Bushing TM dan TR Trafo (untuk 1 phasa) 7 Set - -
Tekep Isolator Arester (untuk 1 phasa) 3 Set - -

i. Jasa Pemasangan :
Konstruksi gardu tiang 3 phasa (konstruksi dudukan trafo, cut out, lightning
1 set 10,334,000 10,334,000
arrester, pentanahan, lemari bagi, trafo)
JUMLAH Rp. 37,415,200
2 Pembangunan gardu tiang 3 phasa 20 kV (1 tiang) 100 kVA
a. Material Utama
TRF DIS;;20kV/400V;3P;100kVA;YZN5;OD 1 Material PLN
CUT OUT;20kV;6-100A;10kA;125kV 3 Material PLN
LA;20-24kV;K;10kA;;; 3 Material PLN
CABLE PWR;NYY;1X70mm2;0.6/1kV;OH 64 Material PLN
CABLE PWR;NYY;1X95mm2;0.6/1kV;OH 36 Material PLN
LVSB;DIST;3P;380V;250A;2LINE;OD 1 Material PLN
b. Konstruksi Dudukan FCO dan Arrester
Travers dudukan fuse cut out/Arrester UNP 10 x 2000 mm 2 Buah 1,054,400 2,108,800
Beugel + mur baut 2 Buah 142,800 285,600
Besi L panjang 700 mm, 50x50x5mm. 2 Buah 193,800 387,600
Double beugel khusus 2 Set 121,200 242,400
Mur Baut 5/8" x 50 mm 8 Buah 33,200 265,600
Penghalang panjat 1 Buah 220,000 220,000
Papan tanda kilat/ Tanda bahaya 1 Buah 110,000 110,000
c. Konstruksi Dudukan Trafo
Dudukan gardu tiang 3 phasa cantol 1 Set 4,283,800 4,283,800
Tanda bahaya di gardu 1 Buah 118,000 118,000
d. Konstruksi Dudukan PHBTR
Travers dudukan PHB TR 3 phasa lengkap (UNP 6,5 x 750 mm) 2 Buah 431,000 862,000
e. Konstruksi Pipa Kabel Opstyg
Pipa galvanized 3" x 6.000 mm medium B 3 Buah 813,800 2,441,400

halaman : 13
HARGA PENAWARAN PER PAKET PEKERJAAN CLUSTER PROPINSI SULAWESI BARAT PT ..........
PERHITUNGAN BIAYA PEMBANGUNAN JTM, JTR DAN Gardu Distribusi JASKONHAR JTM JTR GD 2022
TIDAK TERMASUK HARGA MATERIAL DISTRIBUSI UTAMA (MDU)

VOLUME/PENGADAAN
HARGA PENAWARAN

No. URAIAN KEGIATAN PLN REKANAN JUMLAH HARGA


SAT HARGA SATUAN
(MDU) (NON MDU) (g=fxd)

(Rp) (Rp)
a b c d e f g
Knee galvanized 3" 6 Buah 121,800 730,800
Beugel + mur baut pengikat pipa 3" + mur baut 6 Set 180,000 1,080,000
f. Konstruksi Kabel Jumper
Compression connector AL 70 - 150 mm2 ( CCO ) 3 Buah 50,200 150,600
Terminal lugs /Sepatu Cable Bimetal (Al/Cu) 70 mm² 15 Buah 147,800 2,217,000
Heatshrink / Isolasi Bakar Hitam/warna 70mm 15 Buah 55,400 831,000
Fuselink 8A 3 Buah - -
g. Konstruksi Kabel Opstyg
Terminal lugs /Sepatu Cable Cu 95 mm² 8 Buah 170,000 1,360,000
Heatshrink / Isolasi Bakar Hitam/warna 150mm 8 Buah 83,200 665,600
Terminal lugs /Sepatu Cable Cu 70 mm² 2 Buah 126,400 252,800
Heatshrink / Isolasi Bakar Hitam/warna 70mm 2 Buah 55,400 110,800
Bimetal compression joint ( AL / CU ) + Heatshrink 70 - 70 mm2 8 Buah 157,600 1,260,800
Plastic Strap For JTR (20 Cm) 4 Buah 4,800 19,200
h. Konstruksi Pentanahan
Terminal lugs /Sepatu Cable Cu 50 mm² 12 Buah 113,000 1,356,000
Ground Rod + Clamp 5/8 x 2,5 mtr 4 Set 394,000 1,576,000
Kawat BC draad 50 mm² 25 Meter 138,200 3,455,000
Pipa galvanized 1" x 3.000 mm medium B 2 Buah 154,000 308,000
Pipa galvanized 1" x 1.000 mm medium B 2 Buah 55,800 111,600
Stainless Steel Strap 6 Meter 34,600 207,600
Stopping Buckle 6 Buah 6,400 38,400
Link 25 x 25 mm 4 Buah 6,200 24,800
Tekep Isolator FCO bagian atas (untuk 1 phasa) 3 Set - -
Tekep Isolator FCO bagian bawah (untuk 1 phasa) 3 Set - -
Tekep Isolator Bushing TM dan TR Trafo (untuk 1 phasa) 7 Set - -
Tekep Isolator Arester (untuk 1 phasa) 3 Set - -

i. Jasa Pemasangan -
Konstruksi gardu tiang 3 phasa (konstruksi dudukan trafo, cut out, lightning
1 set 10,434,600 10,434,600
arrester, pentanahan, lemari bagi, trafo)

JUMLAH Rp. 37,515,800


3 Pembangunan gardu tiang 3 phasa 20 kV (2 tiang) 50 kVA
a. Material Utama
TRF DIS;;20kV/400V;3P;50kVA;YZN5;OD 1 Material PLN
CUT OUT;20kV;6-100A;10kA;125kV 3 Material PLN
LA;20-24kV;K;10kA;;; 3 Material PLN
CABLE PWR;NYY;1X70mm2;0.6/1kV;OH 64 Material PLN
CABLE PWR;NYY;1X95mm2;0.6/1kV;OH 36 Material PLN
LVSB;DIST;3P;380V;250A;2LINE;OD 1 Material PLN
b. Konstruksi Dudukan FCO dan Arrester
Travers dudukan fuse cut out/Arrester UNP 10 x 2400 mm 2 Buah 1,352,200 2,704,400
Beugel + mur baut 8 Buah 142,800 1,142,400
Penghalang panjat 2 Buah 220,000 440,000
Papan tanda kilat/ Tanda bahaya 2 Buah 110,000 220,000
c. Konstruksi Dudukan Trafo
Dudukan gardu tiang 3 phasa portal 1 Set 8,120,400 8,120,400
Double beugel / Clam Beugel 2 Set 133,000 266,000
Turn Buckle Medium /Span scroef 5/8" 2 Buah 95,800 191,600
Plat Bordes 2320x600x min1,6 mm 1 Buah 840,400 840,400
Tanda bahaya di gardu 1 Buah 118,000 118,000
d. Konstruksi Dudukan PHBTR
Travers dudukan PHB TR 3 phasa lengkap (UNP 6,5 x 2400 mm) 2 Buah 800,000 1,600,000
e. Konstruksi Pipa Kabel Opstyg
Pipa galvanized 3" x 6.000 mm medium B 3 Buah 813,800 2,441,400
Pipa galvanized 3" x 1.000 mm medium B 3 Buah 183,600 550,800
Knee galvanized 3" 6 Buah 121,800 730,800
Beugel + mur baut pengikat pipa 3" + mur baut 6 Set 180,000 1,080,000
f. Konstruksi Kabel Jumper
Compression connector AL 70 - 150 mm2 ( CCO ) 3 Buah 50,200 150,600
Terminal lugs /Sepatu Cable Bimetal (Al/Cu) 70 mm² 15 Buah 147,800 2,217,000
Heatshrink / Isolasi Bakar Hitam/warna 70mm 15 Buah 55,400 831,000
Fuselink 8A 3 Buah - -
g. Konstruksi Kabel Opstyg
Terminal lugs /Sepatu Cable Cu 95 mm² 8 Buah 170,000 1,360,000
Heatshrink / Isolasi Bakar Hitam/warna 150mm 8 Buah 83,200 665,600
Terminal lugs /Sepatu Cable Cu 70 mm² 2 Buah 126,400 252,800
Heatshrink / Isolasi Bakar Hitam/warna 70mm 2 Buah 55,400 110,800
Bimetal compression joint ( AL / CU ) + Heatshrink 70 - 70 mm2 8 Buah 157,600 1,260,800
Plastic Strap For JTR (20 Cm) 4 Buah 4,800 19,200
h. Konstruksi Pentanahan
Terminal lugs /Sepatu Cable Cu 50 mm² 12 Buah 113,000 1,356,000
Ground Rod + Clamp 5/8 x 2,5 mtr 4 Set 394,000 1,576,000
Kawat BC draad 50 mm² 25 Meter 138,200 3,455,000
Pipa galvanized 1" x 3.000 mm medium B 2 Buah 154,000 308,000
Pipa galvanized 1" x 1.000 mm medium B 2 Buah 55,800 111,600
Stainless Steel Strap 6 Meter 34,600 207,600
Stopping Buckle 6 Buah 6,400 38,400
Link 25 x 25 mm 4 Buah 6,200 24,800
Tekep Isolator FCO bagian atas (untuk 1 phasa) 3 Set - -
Tekep Isolator FCO bagian bawah (untuk 1 phasa) 3 Set - -
Tekep Isolator Bushing TM dan TR Trafo (untuk 1 phasa) 7 Set - -
Tekep Isolator Arester (untuk 1 phasa) 3 Set - -

i. Jasa Pemasangan -
Konstruksi gardu tiang 3 phasa (konstruksi dudukan trafo, cut out, lightning
1 set 12,014,400 12,014,400
arrester, pentanahan, lemari bagi, trafo)

halaman : 14
HARGA PENAWARAN PER PAKET PEKERJAAN CLUSTER PROPINSI SULAWESI BARAT PT ..........
PERHITUNGAN BIAYA PEMBANGUNAN JTM, JTR DAN Gardu Distribusi JASKONHAR JTM JTR GD 2022
TIDAK TERMASUK HARGA MATERIAL DISTRIBUSI UTAMA (MDU)

VOLUME/PENGADAAN
HARGA PENAWARAN

No. URAIAN KEGIATAN PLN REKANAN JUMLAH HARGA


SAT HARGA SATUAN
(MDU) (NON MDU) (g=fxd)

(Rp) (Rp)
a b c d e f g
JUMLAH Rp. 46,405,800

halaman : 15
HARGA PENAWARAN PER PAKET PEKERJAAN CLUSTER PROPINSI SULAWESI BARAT PT ..........
PERHITUNGAN BIAYA PEMBANGUNAN JTM, JTR DAN Gardu Distribusi JASKONHAR JTM JTR GD 2022
TIDAK TERMASUK HARGA MATERIAL DISTRIBUSI UTAMA (MDU)

VOLUME/PENGADAAN
HARGA PENAWARAN

No. URAIAN KEGIATAN PLN REKANAN JUMLAH HARGA


SAT HARGA SATUAN
(MDU) (NON MDU) (g=fxd)

(Rp) (Rp)
a b c d e f g
3 Pembangunan gardu tiang 3 phasa 20 kV (2 tiang) 100 - 160 kVA
a. Material Utama
TRF DIS;;20kV/400V;3P;100-160kVA;YZN5;OD 1 Material PLN
CUT OUT;20kV;6-100A;10kA;125kV 3 Material PLN
LA;20-24kV;K;10kA;;; 3 Material PLN
CABLE PWR;NYY;1X70mm2;0.6/1kV;OH 64 Material PLN
CABLE PWR;NYY;1X150mm2;0.6/1kV;OH 36 Material PLN
LVSB;DIST;3P;380V;250A;2LINE;OD 1 Material PLN
b. Konstruksi Dudukan FCO dan Arrester
Travers dudukan fuse cut out/Arrester UNP 10 x 2400 mm 2 Buah 1,352,200 2,704,400
Beugel + mur baut 8 Buah 142,800 1,142,400
Penghalang panjat 2 Buah 220,000 440,000
Papan tanda kilat/ Tanda bahaya 2 Buah 110,000 220,000
c. Konstruksi Dudukan Trafo
Dudukan gardu tiang 3 phasa portal 1 Set 8,120,400 8,120,400
Double beugel / Clam Beugel 2 Set 133,000 266,000
Turn Buckle Medium /Span scroef 5/8" 2 Buah 95,800 191,600
Plat Bordes 2320x600x min1,6 mm 1 Buah 840,400 840,400
Tanda bahaya di gardu 1 Buah 118,000 118,000
d. Konstruksi Dudukan PHBTR
Travers dudukan PHB TR 3 phasa lengkap (UNP 6,5 x 2400 mm) 2 Buah 800,000 1,600,000
e. Konstruksi Pipa Kabel Opstyg
Pipa galvanized 3" x 6.000 mm medium B 3 Buah 813,800 2,441,400
Pipa galvanized 3" x 1.000 mm medium B 3 Buah 183,600 550,800
Knee galvanized 3" 6 Buah 121,800 730,800
Beugel + mur baut pengikat pipa 3" + mur baut 6 Set 180,000 1,080,000
f. Konstruksi Kabel Jumper
Compression connector AL 70 - 150 mm2 ( CCO ) 3 Buah 50,200 150,600
Terminal lugs /Sepatu Cable Bimetal (Al/Cu) 70 mm² 15 Buah 147,800 2,217,000
Heatshrink / Isolasi Bakar Hitam/warna 70mm 15 Buah 55,400 831,000
Fuselink 8A 3 Buah - -
g. Konstruksi Kabel Opstyg
Terminal lugs /Sepatu Cable Cu 150 mm² 8 Buah 259,800 2,078,400
Heatshrink / Isolasi Bakar Hitam/warna 150mm 8 Buah 83,200 665,600
Terminal lugs /Sepatu Cable Cu 70 mm² 2 Buah 126,400 252,800
Heatshrink / Isolasi Bakar Hitam/warna 70mm 2 Buah 55,400 110,800
Bimetal compression joint ( AL / CU ) + Heatshrink 70 - 70 mm2 8 Buah 157,600 1,260,800
Plastic Strap For JTR (20 Cm) 4 Buah 4,800 19,200
h. Konstruksi Pentanahan
Terminal lugs /Sepatu Cable Cu 50 mm² 12 Buah 113,000 1,356,000
Ground Rod + Clamp 5/8 x 2,5 mtr 4 Set 394,000 1,576,000
Kawat BC draad 50 mm² 25 Meter 138,200 3,455,000
Pipa galvanized 1" x 3.000 mm medium B 2 Buah 154,000 308,000
Pipa galvanized 1" x 1.000 mm medium B 2 Buah 55,800 111,600
Stainless Steel Strap 6 Meter 34,600 207,600
Stopping Buckle 6 Buah 6,400 38,400
Link 25 x 25 mm 4 Buah 6,200 24,800
i. Konstruksi Cover FCO, Arrester, dan Bushing Trafo
Tekep Isolator FCO bagian atas (untuk 1 phasa) 3 Set - -
Tekep Isolator FCO bagian bawah (untuk 1 phasa) 3 Set - -
Tekep Isolator Bushing TM dan TR Trafo (untuk 1 phasa) 7 Set - -
Tekep Isolator Arester (untuk 1 phasa) 3 Set - -
j. Jasa Pemasangan
Konstruksi gardu tiang 3 phasa (konstruksi dudukan trafo, cut out, lightning
1 set 12,115,000 12,115,000
arrester, pentanahan, lemari bagi, trafo)

JUMLAH Rp. 47,224,800


3 Pembangunan gardu tiang 3 phasa 20 kV (2 tiang) 240 - 250 kVA
a. Material Utama
TRF DIS;;20kV/400V;3P;250kVA;YZN5;OD 1 Material PLN
CUT OUT;20kV;6-100A;10kA;125kV 3 Material PLN
LA;20-24kV;K;10kA;;; 3 Material PLN
CABLE PWR;NYY;1X70mm2;0.6/1kV;OH 64 Material PLN
CABLE PWR;NYY;1X150mm2;0.6/1kV;OH 36 Material PLN
LVSB;DIST;3P;380V;250A;2LINE;OD 1 Material PLN
b. Konstruksi Dudukan FCO dan Arrester
Travers dudukan fuse cut out/Arrester UNP 10 x 2400 mm 2 Buah 1,352,200 2,704,400
Beugel + mur baut 8 Buah 142,800 1,142,400
Penghalang panjat 2 Buah 220,000 440,000
Papan tanda kilat/ Tanda bahaya 2 Buah 110,000 220,000
c. Konstruksi Dudukan Trafo
Dudukan gardu tiang 3 phasa portal 1 Set 8,120,400 8,120,400
Double beugel / Clam Beugel 2 Set 133,000 266,000
Turn Buckle Medium /Span scroef 5/8" 2 Buah 95,800 191,600
Plat Bordes 2320x600x min1,6 mm 1 Buah 840,400 840,400
Tanda bahaya di gardu 1 Buah 118,000 118,000
d. Konstruksi Dudukan PHBTR
Travers dudukan PHB TR 3 phasa lengkap (UNP 6,5 x 2400 mm) 2 Buah 800,000 1,600,000
e. Konstruksi Pipa Kabel Opstyg
Pipa galvanized 3" x 6.000 mm medium B 3 Buah 813,800 2,441,400
Pipa galvanized 3" x 1.000 mm medium B 3 Buah 183,600 550,800
Knee galvanized 3" 6 Buah 121,800 730,800
Beugel + mur baut pengikat pipa 3" + mur baut 6 Set 180,000 1,080,000
f. Konstruksi Kabel Jumper
Compression connector AL 70 - 150 mm2 ( CCO ) 3 Buah 50,200 150,600
Terminal lugs /Sepatu Cable Bimetal (Al/Cu) 70 mm² 15 Buah 147,800 2,217,000
Heatshrink / Isolasi Bakar Hitam/warna 70mm 15 Buah 55,400 831,000

halaman : 16
HARGA PENAWARAN PER PAKET PEKERJAAN CLUSTER PROPINSI SULAWESI BARAT PT ..........
PERHITUNGAN BIAYA PEMBANGUNAN JTM, JTR DAN Gardu Distribusi JASKONHAR JTM JTR GD 2022
TIDAK TERMASUK HARGA MATERIAL DISTRIBUSI UTAMA (MDU)

VOLUME/PENGADAAN
HARGA PENAWARAN

No. URAIAN KEGIATAN PLN REKANAN JUMLAH HARGA


SAT HARGA SATUAN
(MDU) (NON MDU) (g=fxd)

(Rp) (Rp)
a b c d e f g
Fuselink 8A 3 Buah - -
g. Konstruksi Kabel Opstyg
Terminal lugs /Sepatu Cable Cu 150 mm² 8 Buah 259,800 2,078,400
Heatshrink / Isolasi Bakar Hitam/warna 150mm 8 Buah 83,200 665,600
Terminal lugs /Sepatu Cable Cu 70 mm² 2 Buah 126,400 252,800
Heatshrink / Isolasi Bakar Hitam/warna 70mm 2 Buah 55,400 110,800
Bimetal compression joint ( AL / CU ) + Heatshrink 70 - 70 mm2 8 Buah 157,600 1,260,800
Plastic Strap For JTR (20 Cm) 4 Buah 4,800 19,200
h. Konstruksi Pentanahan
Terminal lugs /Sepatu Cable Cu 50 mm² 12 Buah 113,000 1,356,000
Ground Rod + Clamp 5/8 x 2,5 mtr 4 Set 394,000 1,576,000
Kawat BC draad 50 mm² 25 Meter 138,200 3,455,000
Pipa galvanized 1" x 3.000 mm medium B 2 Buah 154,000 308,000
Pipa galvanized 1" x 1.000 mm medium B 2 Buah 55,800 111,600
Stainless Steel Strap 6 Meter 34,600 207,600
Stopping Buckle 6 Buah 6,400 38,400
Link 25 x 25 mm 4 Buah 6,200 24,800
i. Konstruksi Cover FCO, Arrester, dan Bushing Trafo
Tekep Isolator FCO bagian atas (untuk 1 phasa) 3 Set - -
Tekep Isolator FCO bagian bawah (untuk 1 phasa) 3 Set - -
Tekep Isolator Bushing TM dan TR Trafo (untuk 1 phasa) 7 Set - -
Tekep Isolator Arester (untuk 1 phasa) 3 Set - -
j. Jasa Pemasangan -
Konstruksi gardu tiang 3 phasa (konstruksi dudukan trafo, cut out, lightning
1 set 12,366,200 12,366,200
arrester, pentanahan, lemari bagi, trafo)

JUMLAH Rp. 47,476,000


4 Pengadaan / pemasangan kabel naik / turun 1 phasa 2 jurusan satu tiang
a. Material Utama
Kabel NYY 1 x 50 mm2 CU 72 mtr Material PLN
Bimetal compression joint ( AL / CU ) + Heatshrink 35 - 50 mm2 6 bh 108,000 648,000
Terminal lugs /Sepatu Cable Cu 50 mm² 12 bh 113,000 1,356,000
Pipa galvanized 3" x 5.000 mm medium B 2 btg 440,800 881,600
Pipa galvanized 3" x 1.000 mm medium B 2 btg 183,600 367,200
Pipa galvanized 1" x 3.000 mm medium B 2 btg 154,000 308,000
Pipa galvanized 1" x 1.000 mm medium B 1 btg 55,800 55,800
Beugel + mur baut pengikat pipa 3" + mur baut 4 set 180,000 720,000
Stainless Steel Strap 2 mtr 34,600 69,200
Stopping Buckle 2 bh 6,400 12,800
Link 25 x 50 mm 2 bh 8,800 17,600
b. Pemasangan
Kabel naik / turun 1 set 502,600 502,600
JUMLAH Rp. 4,938,800
5 Pengadaan / pemasangan kabel naik / turun 3 phasa 2 jurusan satu tiang
a. Material Utama
Kabel NYY 1 x 70 mm2 CU 74 mtr Material PLN
Bimetal compression joint ( AL / CU ) + Heatshrink 50 - 70 mm2 8 bh 144,600 1,156,800
Terminal lugs /Sepatu Cable Cu 70 mm² 8 bh 126,400 1,011,200
Terminal lugs /Sepatu Cable Cu 95 mm² 8 bh 170,000 1,360,000
Pipa galvanized 3" x 6.000 mm medium B 3 btg 813,800 2,441,400
Pipa galvanized 1" x 3.000 mm medium B 2 btg 154,000 308,000
Pipa galvanized 1" x 1.000 mm medium B 1 btg 55,800 55,800
Knee galvanized 3" 9 btg 121,800 1,096,200
Kabel NYY 1 x 95 mm2 CU 34 mtr Material PLN
Beugel + mur baut pengikat pipa 3" + mur baut 4 Set 180,000 720,000
Stainless Steel Strap 2 mtr 34,600 69,200
Stopping Buckle 2 bh 6,400 12,800
Link 25 x 50 mm 2 bh 8,800 17,600
b. Pemasangan
Kabel naik / turun 1 set 1,005,400 1,005,400
JUMLAH Rp. 9,254,400
6 Pengadaan / pemasangan kabel naik / turun 3 phasa 2 jurusan dua tiang
a. Material Utama
Kabel NYY 1 x 70 mm2 CU 74 mtr Material PLN
Kabel NYY 1 x 95 mm2 CU 34 mtr Material PLN
Bimetal compression joint ( AL / CU ) + Heatshrink 50 - 70 mm2 8 bh 144,600 1,156,800
Terminal lugs /Sepatu Cable Cu 70 mm² 8 bh 126,400 1,011,200
Terminal lugs /Sepatu Cable Cu 95 mm² 8 bh 170,000 1,360,000
Pipa galvanized 3" x 6.000 mm medium B 3 btg 813,800 2,441,400
Pipa galvanized 1" x 3.000 mm medium B 2 btg 154,000 308,000
Pipa galvanized 1" x 1.000 mm medium B 1 btg 55,800 55,800
Knee galvanized 3" 9 btg 121,800 1,096,200
Beugel + mur baut 2 bh 142,800 285,600
Beugel + mur baut pengikat pipa 3" + mur baut 3 bh 180,000 540,000
Stainless Steel Strap 2 mtr 34,600 69,200
Stopping Buckle 2 bh 6,400 12,800
Link 25 x 50 mm 2 bh 8,800 17,600
b. Pemasangan
Kabel naik/turun 1 set 1,508,000 1,508,000
JUMLAH Rp. 9,862,600

halaman : 17
HARGA PENAWARAN PER PAKET PEKERJAAN CLUSTER PROPINSI SULAWESI BARAT PT ..........
PERHITUNGAN BIAYA PEMBANGUNAN JTM, JTR DAN Gardu Distribusi JASKONHAR JTM JTR GD 2022
TIDAK TERMASUK HARGA MATERIAL DISTRIBUSI UTAMA (MDU)

VOLUME/PENGADAAN
HARGA PENAWARAN

No. URAIAN KEGIATAN PLN REKANAN JUMLAH HARGA


SAT HARGA SATUAN
(MDU) (NON MDU) (g=fxd)

(Rp) (Rp)
a b c d e f g
C JARINGAN TEGANGAN RENDAH
1 Pemasangan LVTC 1ph 1 kms
a. Material Utama
Bundle conductor (LVTC) 1 phasa 35 mm² 1 kms Material PLN
Compression non tension joint LVTC + heat shrink 35 mm² 3 bh 43,200 129,600
b. Pemasangan
Penarikan LVTC 1 phasa. 1 kms 8,749,600 8,749,600
JUMLAH Rp. 8,879,200
2 Pemasangan LVTC 3ph 1 kms (70 mm)
a. Material Utama
Bundle conductor (LVTC) 3 phasa 70 mm² 1 kms Material PLN
Compression non tension joint LVTC + heat shrink 50 mm² 3 bh 48,800 146,400
Compression non tension joint LVTC + heat shrink 70 mm² 1 bh 60,200 60,200
b. Pemasangan
Penarikan LVTC 3 phasa. 1 kms 11,802,200 11,802,200
JUMLAH Rp. 12,008,800
3 Pemasangan LVTC 3ph 1 kms (35 mm)
a. Material Utama
Bundle conductor (LVTC) 1 phasa 35 mm² 1 kms Material PLN
Compression non tension joint LVTC + heat shrink 35 mm² 4 bh 43,200 172,800
b. Pemasangan
Penarikan LVTC 3 phasa. 1 kms 8,820,400 8,820,400
JUMLAH Rp. 8,993,200
4 Pemasangan suspension / small angle assembly (per titik)
a. Material Utama
Small angle/Suspension Assembly 25-70 mm2 1 set 151,400 151,400
Stainless Steel Strap 1.5 mtr 34,600 51,900
Stopping Buckle 2 bh 6,400 12,800
Plastic Strap For JTR (20 Cm) 2 bh 4,800 9,600
b. Pemasangan 1 unit 77,800 77,800
JUMLAH Rp. 303,500
5 Pemasangan large angle assembly (per Titik)
a. Material Utama
Large angle assembly 50-70 mm2 1 set 234,400 234,400
Stainless Steel Strap 1.5 mtr 34,600 51,900
Stopping Buckle 2 bh 6,400 12,800
Plastic Strap For JTR (20 Cm) 2 bh 4,800 9,600
b. Pemasangan 1 unit 88,400 88,400
JUMLAH Rp. 397,100
6 Pemasangan dead end angle assembly
a. Material Utama
Adjustable Dead end assembly 50-70 mm2 1 set 227,600 227,600
Stainless Steel Strap 1.5 mtr 34,600 51,900
Stopping Buckle 2 bh 6,400 12,800
Plastic Strap For JTR (20 Cm) 2 bh 4,800 9,600
Electrical & Mechanical Protection Set 25-70 mm2 1 set 223,000 223,000
b. Pemasangan 1 unit 88,400 88,400
JUMLAH Rp. 613,300
7 Pemasangan pentanahan ujung JTR.
a. Material Utama
Unimax clamp 50 mm² / split bolt line tap for B27 1 bh 65,200 65,200
Kawat BC draad 50 mm² 9 mtr 138,200 1,243,800
Ground Rod + Clamp 5/8" x 2 mtr 1 set 337,800 337,800
Pipa galvanized 1" x 3.000 mm medium B 1 btg 154,000 154,000
Electrical & Mechanical Protection Set 25-70 mm2 1 set 223,000 223,000
Bimetal compression joint ( AL / CU ) + Heatshrink 35 - 50 mm2 1 bh 108,000 108,000
Stainless Steel Strap 4 mtr 34,600 138,400
Stopping Buckle 4 bh 6,400 25,600
Link 25 x 50 mm 4 bh 8,800 35,200
Plastic Strap For JTR (20 Cm) 2 bh 4,800 9,600
b. Pemasangan bundled end protection set + pentanahan. 1 unit 495,600 495,600
JUMLAH Rp. 2,836,200
8 Pemasangan pentanahan untuk perbaikan nilai tahanan 5 ohm
a. Material Utama
Unimax clamp 50 mm² / split bolt line tap for B27 2 bh 65,200 130,400
Kawat BC draad 50 mm² 2 mtr 138,200 276,400
Ground Rod + Clamp 5/8" x 2 mtr 1 set 337,800 337,800
b. Pemasangan pentanahan. 1 unit 424,800 424,800
JUMLAH Rp. 1,169,400
9. Pemasangan Sambungan LVTC - OPSTIG/PHBTR
a. Material Utama
Bimetal compression joint ( AL / CU ) + Heatshrink 50 - 50 mm2 1 bh 144,600 144,600
Bimetal compression joint ( AL / CU ) + Heatshrink 50 - 70 mm2 1 bh 144,600 144,600
Bimetal compression joint ( AL / CU ) + Heatshrink 70 - 70 mm2 3 bh 157,600 472,800
b. Pemasangan
JUMLAH Rp. 762,000
10 Pemasangan large angle assembly 25-35 mm
a. Material Utama
Large angle assembly 25-35 mm2 1 set 194,400 194,400
Stainless Steel Strap 1.5 mtr 34,600 51,900
Stopping Buckle 2 bh 6,400 12,800
b. Pemasangan 1 unit - -

halaman : 18
HARGA PENAWARAN PER PAKET PEKERJAAN CLUSTER PROPINSI SULAWESI BARAT PT ..........
PERHITUNGAN BIAYA PEMBANGUNAN JTM, JTR DAN Gardu Distribusi JASKONHAR JTM JTR GD 2022
TIDAK TERMASUK HARGA MATERIAL DISTRIBUSI UTAMA (MDU)

VOLUME/PENGADAAN
HARGA PENAWARAN

No. URAIAN KEGIATAN PLN REKANAN JUMLAH HARGA


SAT HARGA SATUAN
(MDU) (NON MDU) (g=fxd)

(Rp) (Rp)
a b c d e f g
JUMLAH Rp. 64,700
11 Pembongkaran LVTC dan ACC
Pembongkaran LVTC 3x35+25 mm2 1 kms 3,381,600 3,381,600
Pembongkaran LVTC 3x50+35 mm2 1 kms 3,381,600 3,381,600
Pembongkaran LVTC 3x70+50 mm2 1 kms 3,381,600 3,381,600
Pembongkaran LVTC 2x35+25 mm2 1 kms 3,381,600 3,381,600
Pembongkaran LVTC 2x25+25 mm2 1 kms 3,381,600 3,381,600
Pembongkaran Assecsories LVTC ( SAA) 1 set 38,800 38,800
Pembongkaran Assecsories LVTC ( DEA, LAA ) 1 set 42,400 42,400
Pembongkaran Bundled End Protection set JTR 1 set 35,400 35,400

TOTAL HARGA VOLUME (JASA + MATERIAL) 2,753,345,800


PPn 11% 302,868,038
JUMLAH TOTAL 3,056,213,838

Terbilang :
…………………….

halaman : 19
HARGA PENAWARAN MATERIAL JTM, JTR, GARDU DISTRIBUSI
CLUSTER PROPINSI SULAWESI BARAT PT ARTHA LESTARI ENGINEERING
JASA KONSTRUKSI DAN PEMELIHARAAN TAHUN 2022
PLN UNIT INDUK WILAYAH SULSELRABAR

HARGA PENAWARAN
No URAIAN KEGIATAN SAT VOL
MATERIAL

1 Bimetal compression joint ( AL / CU ) + Heatshrink 10 - 6 mm2 Buah 1 Rp 60,000


2 Bimetal compression joint ( AL / CU ) + Heatshrink 10 - 10 mm2 Buah 1 Rp 60,000
3 Bimetal compression joint ( AL / CU ) + Heatshrink 16 - 4 mm2 Buah 1 Rp 64,400
4 Bimetal compression joint ( AL / CU ) + Heatshrink 16 - 6 mm2 Buah 1 Rp 64,400
5 Bimetal compression joint ( AL / CU ) + Heatshrink 16 - 10 mm2 Buah 1 Rp 64,400
6 Bimetal compression joint ( AL / CU ) + Heatshrink 16 - 16 mm2 Buah 1 Rp 64,400
7 Bimetal compression joint ( AL / CU ) + Heatshrink 25 - 25 mm2 Buah 1 Rp 108,000
8 Bimetal compression joint ( AL / CU ) + Heatshrink 35 - 35 mm2 Buah 1 Rp 108,000
9 Bimetal compression joint ( AL / CU ) + Heatshrink 35 - 50 mm2 Buah 1 Rp 108,000
10 Bimetal compression joint ( AL / CU ) + Heatshrink 50 - 25 mm2 Buah 1 Rp 144,600
11 Bimetal compression joint ( AL / CU ) + Heatshrink 50 - 35 mm2 Buah 1 Rp 144,600
12 Bimetal compression joint ( AL / CU ) + Heatshrink 50 - 50 mm2 Buah 1 Rp 144,600
13 Bimetal compression joint ( AL / CU ) + Heatshrink 50 - 70 mm2 Buah 1 Rp 144,600
14 Bimetal compression joint ( AL / CU ) + Heatshrink 70 - 50 mm2 Buah 1 Rp 157,600
15 Bimetal compression joint ( AL / CU ) + Heatshrink 70 - 70 mm2 Buah 1 Rp 157,600
16 Bimetal compression joint ( AL / CU ) + Heatshrink 70 - 95 mm2 Buah 1 Rp 155,600
17 Bimetal compression joint ( AL / CU ) + Heatshrink 95 - 70 mm2 Buah 1 Rp 180,000
18 Bimetal compression joint ( AL / CU ) + Heatshrink 95 - 95 mm2 Buah 1 Rp 180,000
19 Bimetal compression joint ( AL / CU ) + Heatshrink 120 - 120 mm2 Buah 1 Rp 200,000
20 Bimetal compression joint ( AL / CU ) + Heatshrink 150 - 150 mm2 Buah 1 Rp 210,000
21 Compression Joint + Heatshrink ( CU ) 4 - 4 mm2 Buah 1 Rp 17,600
22 Compression Joint + Heatshrink ( CU ) 10 - 10 mm2 Buah 1 Rp 18,000
23 Compression Joint + Heatshrink ( CU ) 16 - 16 mm2 Buah 1 Rp 22,200
24 Joint Sleeve compresion 35 / 70 mm (Al/Cu) Buah 1 Rp 110,000
25 Joint Sleeve compresion 70 / 70 mm (Al/Cu) Buah 1 Rp 146,600
26 Compression tension joint AAAC 25-35 mm2 Buah 1 Rp 72,400
27 Compression tension joint AAAC 50 mm2 Buah 1 Rp 91,800
28 Compression tension joint AAAC 70 mm2 Buah 1 Rp 120,800
29 Compression tension joint AAAC 95 mm2 Buah 1 Rp 142,000
30 Compression tension joint AAAC 120 mm2 Buah 1 Rp 201,000
31 Compression tension joint AAAC 150 mm2 Buah 1 Rp 200,000
32 Compression tension joint AAAC 185 mm2 Buah 1 Rp 271,200
33 Compression tension joint AAAC 240 mm2 Buah 1 Rp 240,000
34 Compression connector AL 70 - 70 mm2 ( CCO ) Buah 1 Rp 37,000
35 Compression connector AL 70 - 150 mm2 ( CCO ) Buah 1 Rp 50,200
36 Compression connector AL 150 - 150 mm2 ( CCO ) Buah 1 Rp 55,800
37 Compression connector AL 150 - 240 mm2 ( CCO ) Buah 1 Rp 48,800
38 Compression connector AL 240 - 240 mm2 ( CCO ) Buah 1 Rp 77,200
39 Parallel Groove Clamp AL / AL 25 - 70 mm2 Buah 1 Rp 37,000
40 Parallel Groove Clamp AL / AL 70 - 150 mm2 Buah 1 Rp 73,800
41 Parallel Groove Clamp AL / AL 150 - 240 mm2 Buah 1 Rp 80,000
42 Compression non tension joint LVTC + heat shrink 35 mm² Buah 1 Rp 43,200
43 Compression non tension joint LVTC + heat shrink 50 mm² Buah 1 Rp 48,800
44 Compression non tension joint LVTC + heat shrink 70 mm² Buah 1 Rp 60,200
45 Compression non tension joint LVTC + heat shrink 95 mm² Buah 1 Rp 66,200
46 Compression non tension joint LVTC + heat shrink 120 mm² Buah 1 Rp 80,600
47 Compression non tension joint LVTC + heat shrink 150 mm² Buah 1 Rp 103,200
48 Compression non tension joint LVTC + heat shrink 185 mm² Buah 1 Rp 121,800
49 Compression non tension joint LVTC + heat shrink 240 mm² Buah 1 Rp 136,000
50 Live Line Clamp (LLC) 35 - 70 mm Buah 1 Rp 409,000
51 Live Line Clamp (LLC) 70 - 150 mm Buah 1 Rp 611,600
52 Live Line Clamp (LLC) 150 - 240 mm Buah 1 Rp 536,200
53 Vinyl /tanda fasa kabel 70 mm Buah 1 Rp 21,800
54 Vinyl /tanda fasa kabel 95 mm Buah 1 Rp 25,000
55 Travers dudukan fuse cut out/Arrester UNP 10 x 1.200 mm Buah 1 Rp 594,800
56 Travers dudukan fuse cut out/Arrester UNP 10 x 2000 mm Buah 1 Rp 1,054,400
57 Travers dudukan fuse cut out/Arrester UNP 10 x 2400 mm Buah 1 Rp 1,352,200
58 Travers dudukan PHB TR 3 phasa lengkap (UNP 6,5 x 600 mm) Buah 1 Rp 389,200
59 Travers dudukan PHB TR 3 phasa lengkap (UNP 6,5 x 750 mm) Buah 1 Rp 431,000
60 Travers dudukan PHB TR 3 phasa lengkap (UNP 6,5 x 2400 mm) Buah 1 Rp 800,000
61 Travers/ Cross arm UNP 80 x 50 x 5 x 2000 mm Buah 1 Rp 820,000
62 Travers/ Cross arm UNP 100 x 50 x 5 x 1000 mm Buah 1 Rp 687,400
63 Travers/ Cross arm UNP 100 x 50 x 5 x 1200 mm Buah 1 Rp 785,600
64 Travers/ Cross arm UNP 100 x 50 x 5 x 2000 mm Buah 1 Rp 1,054,400
65 Travers/ Cross arm UNP 100 x 50 x 5 x 2400 mm Buah 1 Rp 1,352,200
HARGA PENAWARAN MATERIAL JTM, JTR, GARDU DISTRIBUSI
CLUSTER PROPINSI SULAWESI BARAT PT ARTHA LESTARI ENGINEERING
JASA KONSTRUKSI DAN PEMELIHARAAN TAHUN 2022
PLN UNIT INDUK WILAYAH SULSELRABAR

HARGA PENAWARAN
No URAIAN KEGIATAN SAT VOL
MATERIAL

66 Tupang Travers/Cross arm/Besi Strip Buah 1 Rp 118,000


67 Besi L panjang 700 mm, 50x50x5mm. Buah 1 Rp 193,800
68 Besi L panjang 1200 mm, 50x50x5mm. Buah 1 Rp 328,200
69 Dudukan gardu tiang 1 phasa cantol Set 1 Rp 2,619,400
70 Dudukan gardu tiang 3 phasa cantol Set 1 Rp 4,283,800
71 Dudukan gardu tiang 3 phasa portal Set 1 Rp 8,120,400
72 Pole mounthing bracket for FCO. Buah 1 Rp 51,400
73 Pole mounthing bracket for LA. Buah 1 Rp 51,400
74 Papan kayu 200x30x3 cm Papan Kayu Kelas I (2 Lembar) Set 1 Rp 370,500
75 Plat Bordes 2320x600x min1,6 mm Buah 1 Rp 840,400
76 Terminal lugs /Sepatu Cable Al 35 mm² Buah 1 Rp 26,200
77 Terminal lugs /Sepatu Cable Al 50 mm² Buah 1 Rp 31,000
78 Terminal lugs /Sepatu Cable Al 70 mm² Buah 1 Rp 34,000
79 Terminal lugs /Sepatu Cable Al 95 mm² Buah 1 Rp 50,400
80 Terminal lugs /Sepatu Cable Al 120 mm² Buah 1 Rp 80,000
81 Terminal lugs /Sepatu Cable Al 150 mm² Buah 1 Rp 86,600
82 Terminal lugs /Sepatu Cable Al 185 mm² Buah 1 Rp 99,000
83 Terminal lugs /Sepatu Cable Al 240 mm² Buah 1 Rp 130,000
84 Terminal lugs /Sepatu Cable Cu 25 mm² Buah 1 Rp 77,800
85 Terminal lugs /Sepatu Cable Cu 35 mm² Buah 1 Rp 75,800
86 Terminal lugs /Sepatu Cable Cu 50 mm² Buah 1 Rp 113,000
87 Terminal lugs /Sepatu Cable Cu 70 mm² Buah 1 Rp 126,400
88 Terminal lugs /Sepatu Cable Cu 95 mm² Buah 1 Rp 170,000
89 Terminal lugs /Sepatu Cable Cu 120 mm² Buah 1 Rp 173,000
90 Terminal lugs /Sepatu Cable Cu 150 mm² Buah 1 Rp 259,800
91 Terminal lugs /Sepatu Cable Cu 185 mm² Buah 1 Rp 413,200
92 Terminal lugs /Sepatu Cable Cu 240 mm² Buah 1 Rp 504,800
93 Terminal lugs /Sepatu Cable Bimetal (Al/Cu) 25 mm² Buah 1 Rp 119,600
94 Terminal lugs /Sepatu Cable Bimetal (Al/Cu) 35 mm² Buah 1 Rp 122,800
95 Terminal lugs /Sepatu Cable Bimetal (Al/Cu) 50 mm² Buah 1 Rp 145,400
96 Terminal lugs /Sepatu Cable Bimetal (Al/Cu) 70 mm² Buah 1 Rp 147,800
97 Terminal lugs /Sepatu Cable Bimetal (Al/Cu) 70 mm² (2 lubang) Buah 1 Rp 146,400
98 Terminal lugs /Sepatu Cable Bimetal (Al/Cu) 95 mm² Buah 1 Rp 174,600
99 Terminal lugs /Sepatu Cable Bimetal (Al/Cu) 120 mm² Buah 1 Rp 208,200
100 Terminal lugs /Sepatu Cable Bimetal (Al/Cu) 150 mm² (1 lubang) Buah 1 Rp 181,000
101 Terminal lugs /Sepatu Cable Bimetal (Al/Cu) 150 mm² (2 lubang) Buah 1 Rp 220,000
102 Terminal lugs /Sepatu Cable Bimetal (Al/Cu) 185 mm² (2 lubang) Buah 1 Rp 318,400
103 Terminal lugs /Sepatu Cable Bimetal (Al/Cu) 240 mm² (1 lubang) Buah 1 Rp 196,800
104 Terminal lugs /Sepatu Cable Bimetal (Al/Cu) 240 mm² (2 lubang) Buah 1 Rp 318,800
105 Pipa galvanized 1" x 1.000 mm medium B Buah 1 Rp 55,800
106 Pipa galvanized 1" x 3.000 mm medium B Buah 1 Rp 154,000
107 Pipa galvanized 1" x 6.000 mm medium B Buah 1 Rp 364,600
108 Pipa galvanized 1.5" x 6.000 mm medium B Buah 1 Rp 458,800
109 Pipa galvanized 3" x 1.000 mm medium B Buah 1 Rp 183,600
110 Pipa galvanized 3" x 5.000 mm medium B Buah 1 Rp 440,800
111 Pipa galvanized 3" x 6.000 mm medium B Buah 1 Rp 813,800
112 Pipa galvanized 4" x 6.000 mm medium A Buah 1 Rp 1,743,800
113 Pipa galvanized 4" x 6.000 mm medium B Buah 1 Rp 1,574,600
114 Pipa galvanized 5" x 6.000 mm medium A Buah 1 Rp 3,386,800
115 Pipa galvanized 5" x 6.000 mm medium B Buah 1 Rp 2,612,400
116 Pipa PVC 1" x 6.000 mm (Setara Maspion) Buah 1 Rp 16,000
117 Pipa PVC 3" x 6.000 mm (Setara Maspion) Buah 1 Rp 200,800
118 Pipa PVC 4" x 6.000 mm (Setara Maspion) Buah 1 Rp 300,000
119 Pipa PVC 5" x 6.000 mm (Setara Maspion) Buah 1 Rp 314,800
120 Knee galvanized 1" Buah 1 Rp 35,600
121 Knee galvanized 3" Buah 1 Rp 121,800
122 Knee galvanized 4" Buah 1 Rp 416,800
123 Knee galvanized 5" Buah 1 Rp 1,045,400
124 Knee PVC 1" Buah 1 Rp 13,000
125 Knee PVC 3" Buah 1 Rp 106,000
126 Knee PVC 4" Buah 1 Rp 219,800
127 Knee PVC 5" Buah 1 Rp 367,000
128 Penghalang panjat Buah 1 Rp 220,000
129 Papan tanda kilat/ Tanda bahaya Buah 1 Rp 110,000
130 Tanda bahaya di gardu Buah 1 Rp 118,000
HARGA PENAWARAN MATERIAL JTM, JTR, GARDU DISTRIBUSI
CLUSTER PROPINSI SULAWESI BARAT PT ARTHA LESTARI ENGINEERING
JASA KONSTRUKSI DAN PEMELIHARAAN TAHUN 2022
PLN UNIT INDUK WILAYAH SULSELRABAR

HARGA PENAWARAN
No URAIAN KEGIATAN SAT VOL
MATERIAL

131 Mur Baut 1/2" x 50 mm Buah 1 Rp 17,000


132 Mur Baut 1/2" x 70 mm Buah 1 Rp 20,000
133 Mur Baut 5/8" x 50 mm Buah 1 Rp 33,200
134 Mur Baut 5/8" x 100 mm Buah 1 Rp 44,600
135 Mur Baut 5/8" x 150 mm Buah 1 Rp 45,800
136 Mur Baut 5/8" x 200 mm Buah 1 Rp 54,600
137 Mur Baut 5/8" x 250 mm Buah 1 Rp 83,400
138 Mur Baut 5/8" x 300 mm Buah 1 Rp 94,000
139 Mur Baut 5/8" x 350mm Buah 1 Rp 32,700
140 Bolt double arming 5/8" x50 mm Buah 1 Rp 27,200
141 Bolt double arming 5/8" x200 mm Buah 1 Rp 56,600
142 Bolt double arming 5/8" x250 mm Buah 1 Rp 59,000
143 Bolt double arming 5/8" x300 mm Buah 1 Rp 61,800
144 Bolt double arming 5/8" x350 mm Buah 1 Rp 67,000
145 Bolt double arming 5/8" x400 mm Buah 1 Rp 99,300
146 Eye bolt 5/8" x 300 mm Buah 1 Rp 32,600
147 Ball Clevis Buah 1 Rp 86,400
148 Socket Eyes Buah 1 Rp 86,400
149 Cross Arm Clevis Buah 1 Rp 76,200
150 Strain Clamp AAAC , ACSR ( 2 Bolt ) 25 - 70 mm2 Buah 1 Rp 107,200
151 Strain Clamp AAAC , ACSR ( 2 Bolt ) 70 - 150 mm2 Buah 1 Rp 138,000
152 Strain Clamp AAAC , ACSR ( 3 Bolt ) 150 - 240 mm2 Buah 1 Rp 299,600
153 Strain Clamp AAAC , ACSR ( 3 Bolt ) 240 - 400 mm2 Buah 1 Rp 366,800
154 Beugel + mur baut Buah 1 Rp 142,800
155 Beugel + mur baut pengikat pipa 3" + mur baut Set 1 Rp 180,000
156 Double beugel / Clam Beugel Set 1 Rp 133,000
157 Double beugel khusus Set 1 Rp 121,200
158 Double beugel + Mur Baut Mata + Eye Bolt Set 1 Rp 184,200
159 Double beugel + spanscroef 5/8" / Clamp Schoer Set 1 Rp 278,200
160 Split bolt line tap to fit. Buah 1 Rp 50,200
161 Splice Jointing rod 70 mm Buah 1 Rp 521,400
162 Splice Jointing rod 150 mm Buah 1 Rp 649,400
163 Helical Dead End + Socket Timble for 70 mm Buah 1 Rp 483,400
164 Helical Dead End + Socket Timble for 150 mm Buah 1 Rp 566,400
165 Guy Insulator 12 kV Buah 1 Rp 119,400
166 Kaos baja / Thimble TM 5/8" Buah 1 Rp 34,600
167 Kaos baja / Thimble TM 3/4" Buah 1 Rp 15,600
168 Preformed dead end gsw 22 mm Buah 1 Rp 80,200
169 Preformed dead end gsw 35 mm Buah 1 Rp 107,000
170 Preformed dead end gsw 50 mm Buah 1 Rp 164,600
171 U - klem 35 - 50 mm Buah 1 Rp 17,600
172 Sackle Medium Buah 1 Rp 48,800
173 Turn Buckle Medium /Span scroef 5/8" Buah 1 Rp 95,800
174 Galvanized Steel Wire 22 mm2 Meter 1 Rp 24,600
175 Galvanized Steel Wire 35 mm2 Meter 1 Rp 24,400
176 Galvanized Steel Wire 50 mm2 Meter 1 Rp 34,000
177 Galvanized Steel Wire 70 mm2 Meter 1 Rp 38,600
178 Angker rod + klem penyambung + mur baut Buah 1 Rp 143,800
179 Plat beton bertulang 40x40x10 cm Buah 1 Rp 110,200
180 Plat beton bertulang 50x50x10 cm Buah 1 Rp 172,200
181 Expanding Anchoor Rod - TM 5/8" x 2,5 mtr Set 1 Rp 687,000
182 Expanding Anchoor Rod - TR 5/8" x 2 mtr Set 1 Rp 473,000
183 Armor Rod Buah 1 Rp 389,400
184 Guy Grip 22 mm2 Buah 1 Rp 51,000
185 Guy Grip 35 mm2 Buah 1 Rp 81,200
186 Guy Grip 70 mm2 Buah 1 Rp 113,400
187 Preformed Top Tie 35 mm2 Buah 1 Rp 50,600
188 Preformed Top Tie 70 mm2 Buah 1 Rp 82,000
189 Preformed Top Tie 150 mm2 Buah 1 Rp 114,600
190 Preformed Side Tie 35 mm2 Buah 1 Rp 51,000
191 Preformed Side Tie 70 mm2 Buah 1 Rp 82,000
192 Preformed Side Tie 150 mm2 Buah 1 Rp 113,400
193 Preformed Double Side Tie for 70 mm2 Buah 1 Rp 145,800
194 Bending Wire 5 mm2 Meter 1 Rp 28,000
195 F Neck Double Side Ties without Armor Rod A3C 70 mm2 Buah 1 Rp 160,400
HARGA PENAWARAN MATERIAL JTM, JTR, GARDU DISTRIBUSI
CLUSTER PROPINSI SULAWESI BARAT PT ARTHA LESTARI ENGINEERING
JASA KONSTRUKSI DAN PEMELIHARAAN TAHUN 2022
PLN UNIT INDUK WILAYAH SULSELRABAR

HARGA PENAWARAN
No URAIAN KEGIATAN SAT VOL
MATERIAL

196 F Neck Top Ties W/O Armor Rood A3C 70 mm2 Buah 1 Rp 113,400
197 F Neck Plastic Top Ties Semicon A3C_S 70 mm2 Buah 1 Rp 158,800
198 F Neck Plastic Top Ties Semicon A3C_S 150 mm2 Buah 1 Rp 167,600
199 F Neck Plastic Top Ties Semicon A3C_S 240 mm2 Buah 1 Rp 174,200
200 F Neck Plastic Double Side Ties Semicon A3C_S 70 mm2 Buah 1 Rp 225,200
201 F Neck Plastic Double Side Ties Semicon A3C_S 150 mm2 Buah 1 Rp 225,800
202 F Neck Plastic Double Side Ties Semicon A3C_S 240 mm2 Buah 1 Rp 220,000
203 Small angle/Suspension Assembly 25-70 mm2 Buah 1 Rp 151,400
204 Fixed Dead end assembly 25-35 mm2 Buah 1 Rp 173,800
205 Fixed Dead end assembly 50-70 mm2 Buah 1 Rp 197,600
206 Adjustable Dead end assembly 25-35 mm2 Buah 1 Rp 221,600
207 Adjustable Dead end assembly 50-70 mm2 Buah 1 Rp 227,600
208 Large angle assembly 25-35 mm2 Buah 1 Rp 194,400
209 Large angle assembly 50-70 mm2 Buah 1 Rp 234,400
210 Electrical & Mechanical Protection Set 25-70 mm2 Buah 1 Rp 223,000
211 Stainless Steel Strap Meter 1 Rp 34,600
212 Stopping Buckle Buah 1 Rp 6,400
213 Stopping Buckle Stainless Steel Buah 1 Rp 10,000
214 Link 25 x 25 mm Buah 1 Rp 6,200
215 Link 25 x 50 mm Buah 1 Rp 8,800
216 Sangga tupang tekan Buah 1 Rp 162,200
217 Connector kedap air 35-70mm2 Buah 1 Rp 63,800
218 Insulated tension joint 25 mm2 Buah 1 Rp 43,800
219 Insulated tension joint 35 mm2 Buah 1 Rp 44,200
220 Insulated tension joint 50 mm2 Buah 1 Rp 49,400
221 Insulated tension joint 70 mm2 Buah 1 Rp 57,400
222 Kawat BC draad 25 mm² Meter 1 Rp 125,600
223 Kawat BC draad 50 mm² Meter 1 Rp 138,200
224 Kawat BC draad 70 mm² Meter 1 Rp 153,000
225 Pipa Arde 1,5 " x 3.000 mm lengkap Set 1 Rp 960,600
226 Unimax clamp 50 mm² / split bolt line tap for B27 Buah 1 Rp 65,200
227 Ground Rod + Clamp 5/8" x 2 mtr Set 1 Rp 337,800
228 Ground Rod + Clamp 5/8 x 2,5 mtr Set 1 Rp 394,000
229 Clamp C ( C Connector ) 50 - 70 mm2 Buah 1 Rp 78,800
230 Parallel Groove CU 50 mm2 Buah 1 Rp 82,600
231 Comp Connector CU for grounding 70 + rubber tape Buah 1 Rp 91,600
232 Suspension Assembly For MVTIC ( 0 - 10 Derajat ) Set 1 Rp 905,800
233 Suspension Assembly MVTIC for Large Angle ( 10 - 25 Derajat ) Set 1 Rp 1,200,200
234 Single Dead End Assembly For MVTIC Set 1 Rp 1,135,600
235 Double Dead End Assembly For MVTIC ( Peregang, > 25 derajat ) Set 1 Rp 2,192,200
236 Ornament Cable for netral + bolt (Aksesoris Penggantung MVTIC) Buah 1 Rp -
237 Disconecting Switch (DS) 20 kV 1 Phs (SPM) Set 1 Rp 9,938,400
238 Dudukan Kubikel + Acrylic penutup Set 1 Rp 1,833,800
239 Double Beugel + Mour Baut untuk pipa 5" (Opstig KTM ) Set 1 Rp 194,000
240 Double Begel Galvanized 114 - 156 mm + baut Set 1 Rp 163,400
241 Double Begel Galvanized 175 - 215 mm + baut Set 1 Rp 184,000
242 Patok beton 20 x 20 x 70 cm tanda KTM PLN Buah 1 Rp 177,800
243 End mof Outdoor 20 kV 1 x 35x95 mm2 (Setara 3M) Set 1 Rp 6,141,400
244 End mof Outdoor 20 kV 3 x 35x95 mm2 (Setara 3M) Set 1 Rp 6,141,400
245 End mof Outdoor 20 kV 1 x 150-240 mm2 (Setara 3M) Set 1 Rp 8,607,800
246 End mof Indoor 20 kV 1 x 150-240 mm2 (Setara 3M) Set 1 Rp 8,600,000
247 End mof Outdoor 20 kV 3 x 150-240 mm2 (Setara 3M) Set 1 Rp 11,096,800
248 End mof Indoor 20 kV 3 x 150-240 mm2 (Setara 3M) Set 1 Rp 11,142,200
249 Elastic mould 20 kV 3 x 150-240 mm2 (Setara 3M) Set 1 Rp -
250 Jointing Heatshrink Cable 3 Core, Size Cable (Setara 3M) + Connector Set 1 Rp 13,570,200

251 Jointing Coldshrink Cable 3 Core, Size Cable (Setara 3M) + Connector Set 1 Rp 15,373,800
252 Jointing MVTIC 1 Core 3x95-300mm 20 kV (Setara 3M) Set 1 Rp 12,657,600
253 Screened Seperable Cable 1x95-240 mm2 sambungan (setara raychem) Set 1 Rp 32,397,600
HARGA PENAWARAN MATERIAL JTM, JTR, GARDU DISTRIBUSI
CLUSTER PROPINSI SULAWESI BARAT PT ARTHA LESTARI ENGINEERING
JASA KONSTRUKSI DAN PEMELIHARAAN TAHUN 2022
PLN UNIT INDUK WILAYAH SULSELRABAR

HARGA PENAWARAN
No URAIAN KEGIATAN SAT VOL
MATERIAL

254 Screened Seperable Cable 1x95-240 mm2 (setara raychem) Set 1 Rp 19,394,000
255 Screened Seperable Cable 3x95-240 mm2 sambungan (setara raychem) Set 1 Rp 34,423,800

256 Screened Seperable Cable 3x95-240 mm2 (setara raychem) Set 1 Rp 23,284,600
257 Electrical Insulating Sealer (Setara 3M) Buah 1 Rp 849,800
258 Insulation Piercing Connector 10-25 (SPM) Buah 1 Rp 45,000
259 Insulation Piercing Connector 35-70 (SPM) Buah 1 Rp 77,200
260 Plastic Strap For JTR (20 Cm) Buah 1 Rp 4,800
261 Plastic Strap For JTR (30 Cm) Buah 1 Rp 5,000
262 Non Tension Joint Copper 50mm Buah 1 Rp 62,800
263 Non Tension Joint Copper 70mm Buah 1 Rp 91,200
264 Non Tension Joint Copper 95mm Buah 1 Rp 111,000
265 Non Tension Joint Copper 150mm Buah 1 Rp 158,000
266 Compression Repair Sleeve 35mm Buah 1 Rp 260,000
267 Compression Repair Sleeve 70mm Buah 1 Rp 260,400
268 Compression Repair Sleeve 150mm Buah 1 Rp 329,200
269 Jumper Type C Copper 35-70 mm Buah 1 Rp 72,000
270 Copper Compression Ground Rod Connector 5/8" 50 mm Buah 1 Rp 51,800
271 Copper Compression Ground Rod Connector 5/8" 70 mm Buah 1 Rp 70,000
272 Heatshrink / Isolasi Bakar Hitam/warna 25mm Buah 1 Rp 64,400
273 Heatshrink / Isolasi Bakar Hitam/warna 35mm Buah 1 Rp 46,600
274 Heatshrink / Isolasi Bakar Hitam/warna 50mm Buah 1 Rp 55,400
275 Heatshrink / Isolasi Bakar Hitam/warna 70mm Buah 1 Rp 55,400
276 Heatshrink / Isolasi Bakar Hitam/warna 120mm Buah 1 Rp 82,200
277 Heatshrink / Isolasi Bakar Hitam/warna 150mm Buah 1 Rp 83,200
278 Socket Galvanized 5" Buah 1 Rp 1,051,000
279 Central Bracket + Mur Baut Set 1 Rp 283,000
280 Slide Bracket + Mur Baut Set 1 Rp 267,600
281 Cable Tray (20x30 cm) Buah 1 Rp 934,400
282 U Ditch L:60 cm T: 60 cm P:100 cm Buah 1 Rp 2,026,600
283 Connector (Shearbolt) Buah 1 Rp 661,800
284 Fusasaver Set 1 Rp 56,357,600
285 Fusasaver Communication Kit Set 1 Rp 5,059,000
286 Trafo Step up/down 10 A ; 220VAC-110VDC Buah 1 Rp -
287 Fuselink 2A Buah 1 Rp -
288 Fuselink 3A Buah 1 Rp -
289 Fuselink 5A Buah 1 Rp -
290 Fuselink 6A Buah 1 Rp -
291 Fuselink 8A Buah 1 Rp -
292 Treeguard 150-240 mm (Setara merk Vixo) meter 1 Rp -
Gembok gardu stainless steel berkode/angka (setara gembok Krisbow 4
293 Buah 1 Rp -
angka)
294 Exhaust fan (1180 - 2010 CFM) Buah 1 Rp -
295 Insulating Spray setara 3M Buah 1 Rp -
296 Cable Lug Shearbolt 95-240 Sqmm Buah 1 Rp -
297 Besi L panjang 2400 mm, 50x50x5 mm Buah 1 Rp -
298 Kawat Seling Baja 1,5 mm lapis Plastik PVC Meter 1 Rp -
299 U clamp 1-3 mm Buah 1 Rp -
300 Tekep Isolator Lurus Set 1 Rp -
301 Tekep Isolator Belokan Set 1 Rp -
Tekep Isolator Extention (untuk memperpanjang tekep isolator
302 Set 1 Rp -
lurus/belokan)
303 Kabel Tie Pendek untuk Tekep Buah 1 Rp -
304 Kabel Tie Panjang untuk Tekep Buah 1 Rp -
305 Tekep Isolator Arester (untuk 1 phasa) Set 1 Rp -
306 Tekep Isolator FCO bagian atas (untuk 1 phasa) Set 1 Rp -
307 Tekep Isolator FCO bagian bawah (untuk 1 phasa) Set 1 Rp -
308 Tekep Isolator Bushing TM dan TR Trafo (untuk 1 phasa) Set 1 Rp -
309 Tekep Isolator Connector untuk cover LLC dan jamperan percabangan Set 1 Rp -
310 Tekep Isolator Strainclamp Set 1 Rp -
Rp -

JUMLAH Rp 358,550,700
PPn 11% Rp 39,440,577
JUMLAH TOTAL Rp 397,991,277

Terbilang : ###
………………………….
HARGA PENAWARAN JASA JTM, JTR, GARDU DISTRIBUSI
CLUSTER PROPINSI SULAWESI BARAT PT ..........
JASA KONSTRUKSI DAN PEMELIHARAAN TAHUN 2022
PLN UNIT INDUK WILAYAH SULSELRABAR

HARGA
No URAIAN KEGIATAN SAT VOL PENAWARAN
JASA

JARINGAN TEGANGAN MENENGAH


PEMASANGAN
1 Penggalian tanah untuk pemancagan tiang TM (tanah) lubang 1 Rp 328,000
2 Penggalian tanah untuk pemancagan tiang TM (berbatu) lubang 1 Rp 739,200
3 Pemancangan tiang besi 11-14 meter batang 1 Rp 516,200
4 Pemancangan tiang beton 11-14 meter batang 1 Rp 1,258,000
5 Penggonian tiang Tiang besi 12-14 + material batang 1 Rp 466,600
6 Penggonian Tiang besi 12-14 + material batang 1 Rp 446,200
7 Pembetonan Tiang 12/200 Type A + Material batang 1 Rp 2,060,200
8 Pembetonan Tiang 12/200 Type B +Material batang 1 Rp 2,100,000
9 Pembetonan Tiang 12/200 Type C + Material batang 1 Rp 2,151,200
10 Pembetonan Tiang 12/200 Type D + Material batang 1 Rp 2,483,400
11 Pembetonan Tiang 12/350 Type A + Material batang 1 Rp 2,060,200
12 Pembetonan Tiang 12/350 Type B +Material batang 1 Rp 2,991,800
13 Pembetonan Tiang 12/350 Type C + Material batang 1 Rp 2,151,200
14 Pembetonan Tiang 12/350 Type D + Material batang 1 Rp 2,483,400
15 Pembetonan Tiang 12/500 Type A + Material batang 1 Rp 2,060,200
16 Pembetonan Tiang 12/500 Type B +Material batang 1 Rp 2,991,800
17 Pembetonan Tiang 12/500 Type C + Material batang 1 Rp 2,151,200
18 Pembetonan Tiang 12/500 Type D + Material batang 1 Rp 2,483,400
19 Pembetonan Tiang 12/800 Type A + Material batang 1 Rp 2,263,800
20 Pembetonan Tiang 12/800 Type B +Material batang 1 Rp 3,118,600
21 Pembetonan Tiang 12/800 Type C + Material batang 1 Rp 2,389,200
22 Pembetonan Tiang 12/800 Type D + Material batang 1 Rp 2,485,400
23 Pembetonan Tiang 12/1200 Type A + Material batang 1 Rp 2,375,400
24 Pembetonan Tiang 12/1200 Type B +Material batang 1 Rp 3,275,000
25 Pembetonan Tiang 12/1200 Type C + Material batang 1 Rp 2,500,600
26 Pembetonan Tiang 12/1200 Type D + Material batang 1 Rp 2,485,400
27 Pembetonan Tiang 13/200 Type A + Material batang 1 Rp 272,200
28 Pembetonan Tiang 13/200 Type B +Material batang 1 Rp 3,209,400
29 Pembetonan Tiang 13/200 Type C + Material batang 1 Rp 2,365,200
30 Pembetonan Tiang 13/200 Type D + Material batang 1 Rp 2,484,400
31 Pembetonan Tiang 13/350 Type A + Material batang 1 Rp 2,727,200
32 Pembetonan Tiang 13/350 Type B +Material batang 1 Rp 3,209,400
33 Pembetonan Tiang 13/350 Type C + Material batang 1 Rp 2,365,200
34 Pembetonan Tiang 13/350 Type D + Material batang 1 Rp 2,484,400
35 Pembetonan Tiang 13/500 Type A + Material batang 1 Rp 2,268,000
36 Pembetonan Tiang 13/500 Type B +Material batang 1 Rp 3,209,400
37 Pembetonan Tiang 13/500 Type C + Material batang 1 Rp 2,365,200
38 Pembetonan Tiang 13/500 Type D + Material batang 1 Rp 2,484,400
39 Pembetonan Tiang 13/800 Type A + Material batang 1 Rp 2,499,000
40 Pembetonan Tiang 13/800 Type B +Material batang 1 Rp 3,345,600
41 Pembetonan Tiang 13/800 Type C + Material batang 1 Rp 2,628,600
42 Pembetonan Tiang 13/800 Type D + Material batang 1 Rp 2,486,200
43 Pembetonan Tiang 13/1200 Type A + Material batang 1 Rp 2,618,800
44 Pembetonan Tiang 13/1200 Type B +Material batang 1 Rp 3,506,400
45 Pembetonan Tiang 13/1200 Type C + Material batang 1 Rp 2,748,400
46 Pembetonan Tiang 13/1200 Type D + Material batang 1 Rp 2,486,200
47 Pembetonan Tiang 14/200 Type A + Material batang 1 Rp 2,485,000
48 Pembetonan Tiang 14/200 Type B +Material batang 1 Rp 3,442,200
49 Pembetonan Tiang 14/200 Type C + Material batang 1 Rp 2,609,200
50 Pembetonan Tiang 14/200 Type D + Material batang 1 Rp 2,485,200
51 Pembetonan Tiang 14/350 Type A + Material batang 1 Rp 2,485,000
52 Pembetonan Tiang 14/350 Type B +Material batang 1 Rp 3,443,200
53 Pembetonan Tiang 14/350 Type C + Material batang 1 Rp 2,609,200
54 Pembetonan Tiang 14/350 Type D + Material batang 1 Rp 2,485,200
55 Pembetonan Tiang 14/500 Type A + Material batang 1 Rp 2,485,000
56 Pembetonan Tiang 14/500 Type B +Material batang 1 Rp 3,442,200
57 Pembetonan Tiang 14/500 Type C + Material batang 1 Rp 2,609,200
58 Pembetonan Tiang 14/500 Type D + Material batang 1 Rp 2,485,200
59 Pembetonan Tiang 14/800 Type A + Material batang 1 Rp 2,766,000
60 Pembetonan Tiang 14/800 Type B +Material batang 1 Rp 3,588,200
61 Pembetonan Tiang 14/800 Type C + Material batang 1 Rp 2,900,200
62 Pembetonan Tiang 14/800 Type D + Material batang 1 Rp 2,487,200
63 Pembetonan Tiang 14/1200 Type A + Material batang 1 Rp 2,766,000
64 Pembetonan Tiang 14/1200 Type B +Material batang 1 Rp 3,588,200
65 Pembetonan Tiang 14/1200 Type C + Material batang 1 Rp 2,900,200
66 Pembetonan Tiang 14/1200 Type D + Material batang 1 Rp 2,487,200
67 Penarikan MVTIC 3 x 70 + 1 x 50 mm2 kms 1 Rp 26,074,000
68 Penarikan MVTIC 3 x 150 + 1 x 95 mm2 kms 1 Rp 47,282,400
69 Penarikan MVTIC 3 x 240 + 1 x 150 mm2 kms 1 Rp 57,595,600
70 Pemasangan suspension Assembly For MVTIC ( 0 - 10 Derajat ) set 1 Rp 332,800

71 Pemasangan suspension Assembly MVTIC for Large Angle ( 10 - 25 Derajat ) set 1 Rp 475,400

72 Pemasangan single Dead End Assembly For MVTIC set 1 Rp 588,800

73 Pemasangan double Dead End Assembly For MVTIC ( Peregang, > 25 derajat ) set 1 Rp 1,177,800

74 Pemasangan Ornament Cable for Netral (Clamp C Penggantung MVTIC) buah 1 Rp -


75 Penarikan Kawat Baja 95mm2 Penggantung MVTIC kms 1 Rp -
76 Pemasangan Jointing 20 kV MVTIC set 1 Rp 3,139,400
77 Pemasangan Terminal Outdoor 20 kV 3x240 mm2 set 1 Rp 913,000
HARGA PENAWARAN JASA JTM, JTR, GARDU DISTRIBUSI
CLUSTER PROPINSI SULAWESI BARAT PT ..........
JASA KONSTRUKSI DAN PEMELIHARAAN TAHUN 2022
PLN UNIT INDUK WILAYAH SULSELRABAR

HARGA
No URAIAN KEGIATAN SAT VOL PENAWARAN
JASA

78 Pemasangan Terminasi MVTIC set 1 Rp 983,400


79 Pengadaan & Pemasangan dudukan Jointing set 1 Rp 332,800
80 Penarikan SUTM A3CS / HIC 3 x 240mm2 kms 1 Rp 18,257,400
81 Penarikan SUTM A3CS / HIC 3 x 150mm2 kms 1 Rp 15,649,200
82 Penarikan SUTM A3CS / HIC 3 x 70mm2 kms 1 Rp 13,041,000
83 Penarikan SUTM A3C 3 x 240mm2 kms 1 Rp 14,345,200
84 Penarikan SUTM A3C 3 x 150mm2 kms 1 Rp 13,041,000
85 Penarikan SUTM A3C 3 x 95 mm2 kms 1 Rp 12,242,600
86 Penarikan SUTM A3C 3 x 70 mm2 kms 1 Rp 11,737,000
87 Penarikan SUTM A3C 3 x 50 mm2 kms 1 Rp 10,309,600
88 Penarikan SUTM A3C 3 x 35 mm2 kms 1 Rp 9,020,800
89 Penggalian & Penimbunan 1 kabel tanah 20 kV di bawah berm + Material meter 1 Rp 420,200

90 Penggalian & Penimbunan 2 kabel tanah 20 kV di bawah berm + Material meter 1 Rp 422,600

91 Penggalian & Penimbunan 3 kabel tanah 20 kV di bawah berm + Material meter 1 Rp 636,200

92 Penggalian & Penimbunan 4 kabel tanah 20 kV di bawah berm + Material meter 1 Rp 788,200

93 Penggalian & Penimbunan 1 kabel tanah 20 kV di bawah jalan aspal + Material meter 1 Rp 1,592,200

94 Penggalian & Penimbunan 2 kabel tanah 20 kV di bawah jalan aspal + Material meter 1 Rp 1,888,000

95 Penggalian & Penimbunan 3 kabel tanah 20 kV di bawah jalan aspal + Material meter 1 Rp 2,414,600

96 Penggalian & Penimbunan 4 kabel tanah 20 kV di bawah jalan aspal + Material meter 1 Rp 3,212,000

97 Penggelaran KTM 3 Ph Single core 16- 50 mm2 meter 1 Rp 58,600


98 Penggelaran KTM 3 Ph Single core 70- 150 mm2 meter 1 Rp 58,600
99 Penggelaran KTM 3 Ph Single core 240-300 mm2 meter 1 Rp 70,400
100 Penggelaran KTM 3 Ph three core 16- 50 mm2 meter 1 Rp 58,600
101 Penggelaran KTM 3 Ph three core 70- 150 mm2 meter 1 Rp 8,800
102 Penggelaran KTM 3 Ph three core 240-300 mm2 meter 1 Rp 8,800
103 Pengeboran dibawah jalan aspal untuk 1 kabel meter 1 Rp -
104 Pengeboran dibawah jalan aspal untuk 2 kabel meter 1 Rp -
105 Pengeboran dibawah jalan aspal untuk 3 kabel meter 1 Rp -
106 Pengeboran dibawah jalan aspal untuk 4 kabel meter 1 Rp -
107 Pemasangan terminasi / end Mof Out door single core set 1 Rp 1,753,400
108 Pemasangan terminasi / end Mof Out door three core set 1 Rp 1,503,000
109 Pemasangan terminasi / end Mof In door single core set 1 Rp 1,503,000
110 Pemasangan terminasi / end Mof In door three core set 1 Rp 1,252,400
111 Pemasangan Jointing Mof set 1 Rp 3,129,200
112 Pemasangan Opstyp KTM set 1 Rp 975,600
113 Pemasangan travers TM 20 kV UNP 8 panjang 1,8 - 2 Mtr batang 1 Rp 208,200
114 Pemasangan travers TM 20 kV UNP 8 panjang 2,2 - 2,6 Mtr batang 1 Rp 291,400
115 Pemasangan travers TM 20 kV UNP 10 panjang 2 - 2,4 Mtr batang 1 Rp 379,200
116 Pemasangan travers TM 20 kV UNP 10 panjang > 2,4 Mtr batang 1 Rp 416,400
117 Pemasangan travers konsul TM 20 kV UNP 10 set 1 Rp 505,600
118 Pemasangan penghalang panjat buah 1 Rp 88,200
119 Pemasangan plat tanda kilat buah 1 Rp 88,200
120 Pemasangan bending wire ( Pengikat isolator ) buah 1 Rp 17,600
121 Pemasangan performad tie ( Pengikat isolator ) buah 1 Rp 17,600
122 Pemasangan penomoran / identitas tiang buah 1 Rp 88,200
123 Pemasangan isolator tumpu 20 Kv buah 1 Rp 1,141,200
124 Pemasangan isolator aspan 20 kV buah 1 Rp 176,600
125 Pemasangan strain clamp 20 kV buah 1 Rp 45,800
126 Pemasangan Tupang tarik set 1 Rp 706,600
127 Pemasangan Tupang tarik pada tiang bantu set 1 Rp 1,953,600
128 Pemasangan Tupang tekan set 1 Rp 1,394,000
129 Pemasangan Fuse Cut Out 20 kV buah 1 Rp 176,600
130 Pemasangan Lightning Arrester 20 kV buah 1 Rp 176,600
131 Pemasangan pembesian pengaman petir pada JTM. set 1 Rp 353,200
132 Pemasangan LBS Manual set 1 Rp 4,461,000

133 Pemasangan LBS Motorized, recloser, FAI, PMCB ( lengkap assesories ) set 1 Rp 5,550,600

134 Pemasangan Kapasitor ( lengkap assesories ) set 1 Rp 6,170,800


135 Pemasangan RTU set 1 Rp 1,060,000
136 Pemasangan treeguard meter 1 Rp 174,400
137 Pemasangan pelindung isolator set 1 Rp 52,800
138 Pemasangan paralel groove buah 1 Rp 34,800
139 Pemasangan joint sleeve buah 1 Rp 52,800
140 Pemasangan H type connector buah 1 Rp 52,800
141 Pemasangan Live Line Connector (LLC) buah 1 Rp 45,200
142 Jasa Pemasangan Kabel Tray meter 1 Rp 58,600

143 Pemasangan Compression Connector AL 35-70 mm2 + Heat Srink/Scoth bh 1 Rp 71,400

144 Pemasangan Compression Connector AL 35-15 mm2 + Heat Srink/Scoth bh 1 Rp 71,400

145 Pemasangan Compression Connector AL 16-16 mm2 + Heat Srink/Scoth bh 1 Rp 71,400

146 Pemasangan Compression Connector AL 10-10 mm2 + Heat Srink/Scoth bh 1 Rp 71,400

147 Pemasangan Compression Connector AL 10-70 mm2 + Heat Srink/Scoth bh 1 Rp 71,400


HARGA PENAWARAN JASA JTM, JTR, GARDU DISTRIBUSI
CLUSTER PROPINSI SULAWESI BARAT PT ..........
JASA KONSTRUKSI DAN PEMELIHARAAN TAHUN 2022
PLN UNIT INDUK WILAYAH SULSELRABAR

HARGA
No URAIAN KEGIATAN SAT VOL PENAWARAN
JASA

148 Pemasangan GSW kms 1 Rp 7,905,200


149 Jasa Tagging Aset titik 1 Rp 9,600
Pemasangan Antena SCADA pada LBS Motorized, Recloser dan Gardu
150 set 1 Rp -
Hubung
151 Pemasangan Penghalang Binatang/hewan buah 1 Rp -
Pemasangan Kabel dan Pentanahan lengkap Antena Scada (Grounding
152 set 1 Rp -
Splitzen)
153 Pemasangan Smart Arrester 20 kV buah 1 Rp -
Rp 473,632,200
PEMBONGKARAN
154 Pencabutan tiang besi batang 1 Rp 489,200
155 Pencabutan tiang beton batang 1 Rp 978,600
156 Pembongkaran isolator tumpu 20 kV buah 1 Rp 70,600
157 Pembongkaran isolator aspan 20 kV set 1 Rp 88,200
158 Pembongkaran strain clamp 20 kV buah 1 Rp 22,800
159 Pembongkaran travers TM 20 kV UNP 8 panjang 1,8 - 2 Mtr batang 1 Rp 88,200
160 Pembongkaran travers TM 20 kV UNP 8 panjang 2,2 - 2,6 Mtr batang 1 Rp 123,600
161 Pembongkaran travers TM 20 kV UNP 10 panjang 2 - 2,4 Mtr batang 1 Rp 158,800
162 Pembongkaran travers TM 20 kV UNP 10 panjang > 2,4 Mtr batang 1 Rp 176,400
163 Pemasangan penghalang panjat buah 1 Rp 44,000
164 Pemasangan plat tanda kilat buah 1 Rp 44,000
165 Pemasangan bending wire ( Pengikat isolator ) buah 1 Rp 8,800
166 Pemasangan performad tie ( Pengikat isolator ) buah 1 Rp 8,800
167 Pembongkaran travers konsul TM 20 kV UNP 10 batang 1 Rp 211,800
168 Pembongkaran MVTIC 3 x 70 + 1 x 50 mm2 kms 1 Rp 14,680,400
169 Pembongkaran MVTIC 3 x 150 + 1 x 95 mm2 kms 1 Rp 22,297,800
170 Pembongkaran MVTIC 3 x 240 + 1 x 150 mm2 kms 1 Rp 31,277,000
171 Pembongkaran suspension Assembly For MVTIC ( 0 - 10 Derajat ) set 1 Rp 176,400

172 Pembongkaran suspension Assembly MVTIC for Large Angle ( 10 - 25 Derajat ) set 1 Rp 211,800
173 Pembongkaran single Dead End Assembly For MVTIC set 1 Rp 211,800
Pembongkaran double Dead End Assembly For MVTIC ( Peregang, > 25
174 set 1 Rp 282,400
derajat )

175 Pembongkaran Ornament Cable for Netral (Clamp C Penggantung MVTIC) buah 1 Rp -

176 Pembongkaran Kawat Baja 95mm2 Penggantung MVTIC kms 1 Rp -


177 Pembongkaran Jointing 20 kV MVTIC 3x240 mm2 set 1 Rp 176,400
178 Pembongkaran Terminal Outdoor 20 kV 3x240 mm2 set 1 Rp 176,400
179 Pembongkaran Terminasi MVTIC set 1 Rp 176,400
180 Pembongkaran dudukan Jointing MVTIC set 1 Rp 642,800
181 Pembongkaran JTM A3CS / HIC 3 x 240 mm2 T. tiang kms 1 Rp 12,263,800
182 Pembongkaran JTM A3CS / HIC 3 x 150 mm2 T. tiang kms 1 Rp 11,148,800
183 Pembongkaran JTM A3CS / HIC 3 x 70 mm2 T. tiang kms 1 Rp 10,034,000
184 Pembongkaran JTM ( A3C 3 x 150mm2 ) T. tiang kms 1 Rp 9,476,400
185 Pembongkaran JTM ( A3C 3 x 70 mm2 ) T. tiang kms 1 Rp 8,919,000
186 Pembongkaran JTM ( A3C 3 x 50 mm2 ) T. tiang kms 1 Rp 7,804,200
187 Pembongkaran JTM ( A3C 3 x 35 mm2 ) T. tiang kms 1 Rp 6,689,200
188 Pembongkaran JTM ( A3C 2 x 150 mm2 ) T. tiang kms 1 Rp 6,131,800
189 Pembongkaran JTM ( A3C 2 x 70-95 mm2 ) T. tiang kms 1 Rp 5,574,400
190 Pembongkaran JTM ( A3C 2 x 35-50 mm2 ) T. tiang kms 1 Rp 4,459,400
191 Pembongkaran Jumper JTM 3 phasa set 1 Rp 176,400
192 Pembongkaran Jumper JTM 2 phasa set 1 Rp 123,600
193 Pembongkaran Opstiq kabel TM 20 kV pada tiang set 1 Rp 1,251,000
194 Pembongkaran LBS Manual set 1 Rp 1,468,000

195 Pembongkaran LBS Motorized, recloser, FAI, PMCB ( lengkap assesories ) set 1 Rp 2,229,600

196 Pembongkaran Kapasitor ( lengkap assesories ) set 1 Rp 2,229,600


197 Pembongkaran RTU set 1 Rp 353,000
198 Pembongkaran Tupang Tarik TM set 1 Rp 353,000
199 Pembongkaran Tupang Tarik TM + tiang bantu set 1 Rp 529,600
200 Pembongkaran Tupang Tekan Tiang besi 9 Mtr set 1 Rp 421,200
201 Pembongkaran Tupang Tekan Tiang besi 11 Mtr set 1 Rp 505,400
202 Pembongkaran Tupang Tekan Tiang besi 12 Mtr set 1 Rp 582,600
203 Pembongkaran Tupang Tekan Tiang besi 13 Mtr set 1 Rp 624,400
204 Pembongkaran Tupang Tekan Tiang beton 9 Mtr set 1 Rp 734,000
205 Pembongkaran Tupang Tekan Tiang beton 11 Mtr set 1 Rp 831,800
206 Pembongkaran Tupang Tekan Tiang beton 12 Mtr set 1 Rp 929,600
207 Pembongkaran Tupang Tekan Tiang beton 13 Mtr set 1 Rp 1,076,400
208 Pembongkaran Lightning Arrester 20kV set 1 Rp 176,400
209 Pembongkaran Cut Out 20 kV set 1 Rp 176,400
210 Pembongkaran treeguard meter 1 Rp 88,200
211 Pembongkaran pelindung isolator set 1 Rp 26,400
212 Pembongkaran paralel groove buah 1 Rp 17,600
213 Pembongkaran joint sleeve buah 1 Rp 35,200
214 Pembongkaran H type connector buah 1 Rp 35,200
215 Pembongkaran 1 kabel tanah 20 kV di bawah berm meter 1 Rp 314,800
216 Pembongkaran 2 kabel tanah 20 kV di bawah berm meter 1 Rp 314,800
217 Pembongkaran 3 kabel tanah 20 kV di bawah berm meter 1 Rp 449,800
218 Pembongkaran 4 kabel tanah 20 kV di bawah berm meter 1 Rp 539,800
219 Pembongkaran 1 kabel tanah 20 kV di bawah jalan aspal + Material meter 1 Rp 1,302,400
220 Pembongkaran 2 kabel tanah 20 kV di bawah jalan aspal + Material meter 1 Rp 1,953,600
221 Pembongkaran 3 kabel tanah 20 kV di bawah jalan aspal + Material meter 1 Rp 1,494,600
HARGA PENAWARAN JASA JTM, JTR, GARDU DISTRIBUSI
CLUSTER PROPINSI SULAWESI BARAT PT ..........
JASA KONSTRUKSI DAN PEMELIHARAAN TAHUN 2022
PLN UNIT INDUK WILAYAH SULSELRABAR

HARGA
No URAIAN KEGIATAN SAT VOL PENAWARAN
JASA

222 Pembongkaran 4 kabel tanah 20 kV di bawah jalan aspal + Material meter 1 Rp 1,992,800
223 Pembongkaran KTM 3 Ph Single core 16- 50 mm2 meter 1 Rp 21,000
224 Pembongkaran KTM 3 Ph Single core 70- 150 mm2 meter 1 Rp 21,000
225 Pembongkaran KTM 3 Ph Single core 240-300 mm2 meter 1 Rp 35,000
226 Pembongkaran KTM 3 Ph three core 16- 50 mm2 meter 1 Rp 21,000
227 Pembongkaran KTM 3 Ph three core 70- 150 mm2 meter 1 Rp 35,000
228 Pembongkaran KTM 3 Ph three core 240-300 mm2 meter 1 Rp 35,000
229 Pembongkaran Antena SCADA pada LBS Recloser dan Gardu Hubung set 1 Rp -
230 Pembongkaran Penghalang Binatang/hewan buah 1 Rp -
Pembongkaran Kabel dan Pentanahan lengkap Antena Scada (Grounding
231 set 1 Rp -
Splitzen)

PEMELIHARAAN
232 Menegakkan tiang besi yang miring batang 1 Rp 845,400
233 Menegakkan tiang beton yang miring batang 1 Rp 981,600
234 Perbaikan tiang besi kropos (material+las) buah 1 Rp 1,778,800
235 Pengecatan tiang besi TM + Material batang 1 Rp 17,600
236 Pengencangan baut-baut sambungan ( Konector, skun, terminal, dll ) buah 1 Rp 278,800
237 Pengencangan (perbaikan andongan) gawang 1 Rp 278,800
238 Perbaikan penghantar terburai titik 1 Rp 315,800
239 Pembersihan rangka layang - layang, dll titik 1 Rp 106,000
240 Pembersihan Isolator, bushing 20 kV buah 1 Rp 52,800
241 Perbaikan posisi travers tunggal miring set 1 Rp 247,200
242 Perbaikan posisi travers double miring set 1 Rp 353,200
243 Perbaikan tupang tarik buah 1 Rp 177,200
244 Perbaikan posisi tupang tekan set 1 Rp 419,200
245 Pembersihan LBS manual 20 kV set 1 Rp 176,200
246 Pembersihan LBS motorized, FAI, recloser, FMCB set 1 Rp 70,600

GARDU DISTRIBUSI, GARDU HUBUNG / PELANGGAN


PEMASANGAN
247 Pemasangan Trafo 1 fasa 25 - 50 kVA set 1 Rp 854,600
248 Pemasangan Trafo 3 fasa 25 - 50 kVA set 2 Rp 904,800
249 Pemasangan Trafo 3 fasa 100 - 160 kVA set 3 Rp 1,005,400
250 Pemasangan Trafo 3 fasa 200 - 250 kVA set 4 Rp 1,256,600
251 Pemasangan Trafo 3 fasa 315 - 630 kVA set 5 Rp 1,410,000
252 Pemasangan kabel Naik/turun 1 jurusan u/ GT 1 fs set 6 Rp 244,000
253 Pemasangan kabel Naik/turun 2 jurusan u/ GT 1 fs set 7 Rp 502,600
254 Pemasangan kabel Naik/turun 1 jurusan u/ GT 3 fs set 8 Rp -
255 Pemasangan kabel Naik/turun 2 jurusan u/ GT 3 fs set 9 Rp 1,005,400
256 Pemasangan kabel Naik/turun 3 jurusan u/ GT 3 fs set 10 Rp 1,256,600
257 Pemasangan kabel Naik/turun 4 jurusan u/ GT 3 fs set 11 Rp 1,508,000
258 Pemasangan dudukan / konstruksi trafo 1 Fasa 1 tiang set 12 Rp 502,600
259 Pemasangan dudukan / konstruksi trafo 3 Fasa 1 tiang set 13 Rp 502,600
260 Pemasangan dudukan / konstruksi trafo 3 fasa 2 tiang set 14 Rp 1,141,600
261 Pemasangan travers dudukan FCO / LA untuk GD tiang 1/3 phasa set 15 Rp 295,000
262 Pemasangan travers UNP 6 dudukan Lemari bagi TR 1 phasa set 16 Rp 252,800

263 Pemasangan travers UNP 6 dudukan Lemari bagi TR 3 phasa konst. 1 tiang set 17 Rp 252,800

264 Pemasangan travers UNP 6 dudukan Lemari bagi TR 3 phasa konst. 2 tiang set 18 Rp 421,400

265 Pemasangan Lemari Bagi TR 1 phasa 2 Jurusan lengkap set 19 Rp 842,800


266 Pemasangan Lemari Bagi TR 3 phasa 2-3 Jurusan lengkap set 20 Rp 251,200
267 Pemasangan Lemari Bagi TR 3 phasa 4-6 Jurusan lengkap set 21 Rp 377,000
268 Pemasangan Pentanahan Arester, body trafo, kabel opstik JTM set 22 Rp 530,000
269 Pemasangan Pentanahan PHB TR, handle LBS manual set 23 Rp 353,200
270 Pemasangan kubikel Incoming DS 20 kV air insulated ( Manual ) set 24 Rp 998,800
271 Pemasangan kubikel air insulated manual, Incoming CB 20 kV sel 25 Rp 1,400,000
272 Pemasangan kubikel air insulated manual, Outgoing LBS 20 kV set 26 Rp 1,141,600
273 Pemasangan kubikel air insulated manual, Outgoing LBS + Fuse 20 kV set 27 Rp 713,500
274 Pemasangan Kubikel air insulated manual, Outgoing (CB) 20 kV set 28 Rp 1,427,000
275 Pemasangan kubikel air insulated manual, Metering 20 kV set 29 Rp 998,800
276 Pemasangan kubikel air insulated motorized, Incoming DS 20 kV set 30 Rp 1,141,600
277 Pemasangan Kubikel air insulated motorized, Incoming CB 20 kV sel 31 Rp 1,712,400
278 Pemasangan kubikel air insulated motorized, Outgoing LBS 20 kV set 32 Rp 1,427,000

279 Pemasangan kubikel air insulated motorized, Outgoing LBS + Fuse 20 kV set 33 Rp 1,427,000

280 Pemasangan kubikel air insulated motorized, Outgoing (CB) 20 kV set 34 Rp 1,427,000
281 Pemasangan kubikel fully insulated Manual, Incoming LBS 20 kV set 35 Rp 1,427,000
282 Pemasangan kubikel fully insulated Motorized, Incoming LBS 20 kV set 36 Rp 1,084,400
283 Pemasangan kubikel fully insulated Motorized, Incoming CB 20 kV set 37 Rp 1,141,600
284 Pemasangan kubikel fully insulated Motorized, Outgoing CB 20 kV set 38 Rp 1,141,600
285 Pemasangan kubikel fully insulated Motorized, Outgoing LBS 20 kV set 39 Rp 1,427,000

286 Pemasangan kubikel fully insulated Motorized, Outgoing LBS+Fuse 20 kV set 40 Rp 998,800

287 Pemasangan kubikel fully insulated Motorized, Metering 20 kV set 41 Rp 998,800


288 Pemasangan power supply / catu daya kubikel 20 kV buah 42 Rp 42,000
289 Pemasangan elastimol 20 kV buah 43 Rp 212,000
290 Pemasangan DS 20 kV manual outdoor 1 phase buah 44 Rp 316,000
HARGA PENAWARAN JASA JTM, JTR, GARDU DISTRIBUSI
CLUSTER PROPINSI SULAWESI BARAT PT ..........
JASA KONSTRUKSI DAN PEMELIHARAAN TAHUN 2022
PLN UNIT INDUK WILAYAH SULSELRABAR

HARGA
No URAIAN KEGIATAN SAT VOL PENAWARAN
JASA

291 Pemasangan gardu pelanggan open cell 20 kV (Indoor) set 45 Rp 3,371,600


292 Pemasangan gardu pelanggan open cell 20 kV (outdoor) set 46 Rp 87,200
293 Pemasangan fuse holder / fuse base buah 47 Rp 209,400
294 Pemasangan saklar induk set 48 Rp 141,200
295 Pemasangan kunci gembok gardu distribusi model grendel set 49 Rp 141,200
296 Pemasangan kunci gembok gardu distribusi buah 50 Rp 35,200
297 Pemasangan dudukan gardu (beton) Portal buah 51 Rp 4,134,800
298 Pemasangan dudukan gardu (beton) Cantol buah 52 Rp 3,438,400
299 Pemasangan Plat Nama Gardu+material Alluminium buah 53 Rp 316,200
300 Pemasangan Tutup Bushing Trafo, FCO dan Arrester (per Fasa) set 54 Rp -

PEMBONGKARAN
301 Pembongkaran Trafo 1 Fasa set 1 Rp 634,000
302 Pembongkaran Trafo 3 Fasa set 1 Rp 845,400
303 Pembongkaran travers / pembesian isolator aspan set 1 Rp 169,000
304 Pembongkaran travers / pembesian isolator tumpu set 1 Rp 126,800
305 Pembongkaran kabel Naik/turun 1 jurusan u/ GT 1 fs set 1 Rp 207,000
306 Pembongkaran kabel Naik/turun 2 jurusan u/ GT 1 fs set 1 Rp 211,200
307 Pembongkaran kabel Naik/turun 1 jurusan u/ GT 3 fs set 1 Rp 401,400
308 Pembongkaran kabel Naik/turun 2 jurusan u/ GT 3 fs set 1 Rp 422,600
309 Pembongkaran kabel Naik/turun 3 jurusan u/ GT 3 fs set 1 Rp 739,600
310 Pembongkaran kabel Naik/turun 4 jurusan u/ GT 3 fs set 1 Rp 634,000
311 Pembongkaran dudukan / konstruksi trafo 1 Fasa 1 tiang set 1 Rp 211,200
312 Pembongkaran dudukan / konstruksi trafo 3 Fasa 1 tiang set 1 Rp 211,200
313 Pembongkaran dudukan / konstruksi trafo 3 fasa 2 tiang set 1 Rp 490,800
314 Pembongkaran travers dudukan FCO / LA untuk GD tiang 1 phasa set 1 Rp 147,800
315 Pembongkaran travers UNP 6 dudukan Lemari bagi TR 1 phasa set 1 Rp 126,800

316 Pembongkaran travers UNP 6 dudukan Lemari bagi TR 3 phasa konst. 1 tiang set 1 Rp 126,800

317 Pembongkaran travers UNP 6 dudukan Lemari bagi TR 3 phasa konst. 2 tiang set 1 Rp 211,200

318 Pembongkaran Lemari Bagi TR 1 phasa 2 Jurusan lengkap set 1 Rp 211,200


319 Pembongkaran Lemari Bagi TR 3 phasa 2-3 Jurusan lengkap set 1 Rp 211,200
320 Pembongkaran Lemari Bagi TR 3 phasa 4-6 Jurusan lengkap set 1 Rp 317,800
321 Pembongkaran Pentanahan Arester, body trafo, kabel opstik JTM set 1 Rp 266,800
322 Pembongkaran Pentanahan PHB TR, handle LBS manual set 1 Rp 177,800
323 Pembongkaran kubikel Incoming DS 20 kV air insulated ( Manual ) set 1 Rp 501,400
324 Pembongkaran kubikel air insulated manual, Incoming CB 20 kV sel 1 Rp 716,400
325 Pembongkaran kubikel air insulated manual, Outgoing LBS 20 kV set 1 Rp 573,200
326 Pembongkaran kubikel air insulated manual, Outgoing LBS + Fuse 20 kV set 1 Rp 573,200
327 Pembongkaran Kubikel air insulated manual, Outgoing (CB) 20 kV set 1 Rp 716,400
328 Pembongkaran kubikel air insulated manual, Metering 20 kV set 1 Rp 1,003,000
329 Pembongkaran kubikel air insulated motorized, Incoming DS 20 kV set 1 Rp 573,200
330 Pembongkaran Kubikel air insulated motorized, Incoming CB 20 kV sel 1 Rp 859,800
331 Pembongkaran kubikel air insulated motorized, Outgoing LBS 20 kV set 1 Rp 716,400
332 Pembongkaran kubikel air insulated motorized, Outgoing LBS + Fuse 20 kV set 1 Rp 716,400
333 Pembongkaran kubikel air insulated motorized, Outgoing (CB) 20 kV set 1 Rp 716,400
334 Pembongkaran kubikel fully insulated Motorized, Incoming LBS 20 kV set 1 Rp 1,089,000
335 Pembongkaran kubikel fully insulated Motorized, Incoming LBS 20 kV set 1 Rp 1,089,000
336 Pembongkaran kubikel fully insulated Motorized, Incoming CB 20 kV set 1 Rp 573,200
337 Pembongkaran kubikel fully insulated Motorized, Outgoing CB 20 kV set 1 Rp 573,200
338 Pembongkaran kubikel fully insulated Motorized, Outgoing LBS 20 kV set 1 Rp 716,400
339 Pembongkaran kubikel fully insulated Motorized, Incoming LBS+Fuse 20 kV set 1 Rp 1,003,000
340 Pembongkaran kubikel fully insulated Motorized, Metering 20 kV set 1 Rp 1,003,000
341 Pembongkaran elastimol 20 kV buah 1 Rp 106,600
342 Pembongkaran power supply / catu daya kubikel 20 kV buah 1 Rp 21,000
343 Pembongkaran DS 20 kV manual outdoor 1 phase buah 1 Rp 158,800
344 Pembongkaran gardu Pelanggan open cell 20 kV set 1 Rp 1,695,600
345 Pembongkaran fuse holder / fuse base buah 1 Rp 44,400
346 Pembongkaran saklar induk set 1 Rp 106,600
347 Pembongkaran kunci gardu distribusi model grendel set 1 Rp 71,000

PEMELIHARAAN
348 Pembersihan, pelumasan kubikel air insulated 20 kV set 1 Rp 339,200
349 Penggantian Heater kubikel air insulated 20 kV bh 1 Rp 212,000
350 Pengambilan contoh minyak trafo bh 1 Rp 105,800
351 Penggantian minyak trafo (jasa) liter 1 Rp 353,000
352 Penambahan minyak trafo (jasa) liter 1 Rp 105,000
353 Pengukuran beban gardu distribusi & tegangan ujung JTR 1 fasa gardu 1 Rp 79,400
354 Pengukuran beban gardu distribusi & tegangan ujung JTR 3 fasa 2 jurusan gardu 1 Rp 211,800
355 Pengukuran beban gardu distribusi & tegangan ujung JTR 3 fasa 4 jurusan gardu 1 Rp 282,600
Pemeliharaan gardu distribusi 1 phasa ( pembersihan, pengencangan baut,
356 set 1 Rp 336,600
pelumasan )
Pemeliharaan gardu distribusi 3 phasa ( pembersihan, pengencangan baut,
357 set 1 Rp 505,000
pelumasan )
358 Pengecatan lemari bagi 1 phasa 2 jurusan + Material cat panel 1 Rp 301,200
359 Pengecatan lemari bagi 3 phasa 2 jurusan + Material cat panel 1 Rp -
360 Pengecatan lemari bagi 3 phasa 4 jurusan + Material cat panel 1 Rp 462,400
361 Pengecatan lemari bagi 3 phasa 6 jurusan + Material cat panel 1 Rp -
362 Penyeimbangan beban gardu distribusi 1 jurusan bh 1 Rp 841,800
363 Penyeimbangan beban gardu distribusi 2 jurusan bh 1 Rp 1,262,600
HARGA PENAWARAN JASA JTM, JTR, GARDU DISTRIBUSI
CLUSTER PROPINSI SULAWESI BARAT PT ..........
JASA KONSTRUKSI DAN PEMELIHARAAN TAHUN 2022
PLN UNIT INDUK WILAYAH SULSELRABAR

HARGA
No URAIAN KEGIATAN SAT VOL PENAWARAN
JASA

364 Penyeimbangan beban gardu distribusi 3 jurusan bh 1 Rp 1,683,600


365 Penyeimbangan beban gardu distribusi 4 jurusan bh 1 Rp 2,104,400
366 Penggantian kabel Schoen bh 1 Rp 52,800
367 Menyesuaikan rating NT fuse bh 1 Rp 14,000
368 Menyesuaikan rating fuse link bh 1 Rp 35,200
369 Membersihkan peralatan gardu open cell ls 1 Rp 194,200
370 Membersihkan peralatan kubikel & catu daya ls 1 Rp 158,800
371 Membersihkan ruangan dan pekarangan sekitar Gardu Distribusi Beton ls 1 Rp 176,600
372 Membersihkan Gardu Distrbusi Portal ls 1 Rp 211,800
373 Membersihkan Gardu Distrbusi Cantol ls 1 Rp 141,200
374 Pemeliharaan Kunci Gardu Distribusi bh 1 Rp 42,200
375 Perbaikan Pentanahan Arester, body trafo, kabel opstik JTM set 1 Rp 264,800
376 Perbaikan Pentanahan PHB TR, handle LBS manual set 1 Rp 176,600
377 Pemasangan semen konduktif untuk perbaikan pentanahan lubang 1 Rp -

JARINGAN TEGANGAN RENDAH


PEMASANGAN
378 Penggalian tanah untuk pemancangan tiang TR (tanah) lubang 1 Rp 272,600
379 Penggalian tanah untuk pemancangan tiang TR (berbatu) lubang 1 Rp -
380 Pemancangan tiang besi 7-9 meter batang 1 Rp 416,400
381 Pemancangan tiang beton 7-9 meter batang 1 Rp 976,400
382 Penggonian tiang Tiang besi 7/9 + material batang 1 Rp 436,000
383 Pembetonan Tiang 9/100 Type A + Material batang 1 Rp 6,746,000
384 Pembetonan Tiang 9/100 Type B +Material batang 1 Rp 739,800
385 Pembetonan Tiang 9/100 Type C + Material batang 1 Rp 1,353,600
386 Pembetonan Tiang 9/100 Type D + Material batang 1 Rp 1,382,200
387 Pembetonan Tiang 9/100 Type E + Material batang 1 Rp 1,744,600
388 Pembetonan Tiang 9/100 Type F + Material batang 1 Rp 3,655,000
389 Pembetonan Tiang 9/200 Type A + Material batang 1 Rp 674,600
390 Pembetonan Tiang 9/200 Type B +Material batang 1 Rp 739,800
391 Pembetonan Tiang 9/200 Type C + Material batang 1 Rp 1,353,600
392 Pembetonan Tiang 9/200 Type D + Material batang 1 Rp 1,382,200
393 Pembetonan Tiang 9/200 Type E + Material batang 1 Rp 1,608,800
394 Pembetonan Tiang 9/200 Type F + Material batang 1 Rp 3,655,000
395 Pembetonan Tiang 9/350 Type A + Material batang 1 Rp 753,200
396 Pembetonan Tiang 9/350 Type B +Material batang 1 Rp 826,200
397 Pembetonan Tiang 9/350 Type C + Material batang 1 Rp 1,512,000
398 Pembetonan Tiang 9/350 Type D + Material batang 1 Rp 1,564,800
399 Pembetonan Tiang 9/350 Type E + Material batang 1 Rp 1,610,000
400 Pembetonan Tiang 9/350 Type F + Material batang 1 Rp 3,757,600
401 Pembetonan Tiang 11/200 Type A + Material batang 1 Rp 894,800
402 Pembetonan Tiang 11/200 Type B +Material batang 1 Rp 973,200
403 Pembetonan Tiang 11/200 Type C + Material batang 1 Rp 1,845,200
404 Pembetonan Tiang 11/200 Type D + Material batang 1 Rp 1,861,000
405 Pembetonan Tiang 11/200 Type E + Material batang 1 Rp 1,611,000
406 Pembetonan Tiang 11/200 Type F + Material batang 1 Rp 3,850,200
407 Pembetonan Tiang 11/350 Type A + Material batang 1 Rp 894,800
408 Pembetonan Tiang 11/350 Type B +Material batang 1 Rp 973,200
409 Pembetonan Tiang 11/350 Type C + Material batang 1 Rp 1,845,200
410 Pembetonan Tiang 11/350 Type D + Material batang 1 Rp 1,892,000
411 Pembetonan Tiang 11/350 Type E + Material batang 1 Rp 1,611,000
412 Pembetonan Tiang 11/350 Type F + Material batang 1 Rp 3,850,200
413 Pembetonan Tiang 11/500 Type A + Material batang 1 Rp 894,800
414 Pembetonan Tiang 11/500 Type B +Material batang 1 Rp 973,200
415 Pembetonan Tiang 11/500 Type C + Material batang 1 Rp 1,845,200
416 Pembetonan Tiang 11/500 Type D + Material batang 1 Rp 1,929,600
417 Pembetonan Tiang 11/500 Type E + Material batang 1 Rp 1,611,000
418 Pembetonan Tiang 11/500 Type F + Material batang 1 Rp 3,850,200
419 Pemasangan / penarikan LVTC 3x35+25 mm2 kms 1 Rp 8,537,200
420 Pemasangan / penarikan LVTC 3x50+35 mm2 kms 1 Rp 10,079,200
421 Pemasangan / penarikan LVTC 3x70+50 mm2 kms 1 Rp 11,519,000
422 Pemasangan / penarikan LVTC 2x35+25 mm2 kms 1 Rp 7,199,400
423 Pemasangan / penarikan LVTC 2x25+25 mm2 kms 1 Rp 7,199,400
424 Pemasangan Assecsories LVTC ( SAA) set 1 Rp 77,800
425 Pemasangan Assecsories LVTC ( DEA, LAA ) set 1 Rp 88,400
426 Pemasangan Bundled End Protection set set 1 Rp 70,800
427 Pemasangan Tupang tarik TR set 1 Rp 637,200
428 Pemasangan Tupang tarik dengan tiang bantu TR set 1 Rp 971,000
429 Pemasangan tupang tekan TR set 1 Rp 1,284,200

430 Penggalian & Penimbunan 1 kabel tanah SUTR di bawah berm + Material meter 1 Rp 359,400

431 Penggalian & Penimbunan 2 kabel tanah SUTR di bawah berm + Material meter 1 Rp 401,000

432 Penggalian & Penimbunan 3 kabel tanah SUTR di bawah berm + Material meter 1 Rp 579,400

433 Penggalian & Penimbunan 5 kabel tanah SUTR di bawah berm + Material meter 1 Rp 709,200

434 Penggalian & Penimbunan 1 kabel tanah SUTR di bawah trotar + Material meter 1 Rp 439,200

435 Penggalian & Penimbunan 1 kabel tanah SUTR di bawah jalan aspal + Material meter 1 Rp 1,430,600
HARGA PENAWARAN JASA JTM, JTR, GARDU DISTRIBUSI
CLUSTER PROPINSI SULAWESI BARAT PT ..........
JASA KONSTRUKSI DAN PEMELIHARAAN TAHUN 2022
PLN UNIT INDUK WILAYAH SULSELRABAR

HARGA
No URAIAN KEGIATAN SAT VOL PENAWARAN
JASA

436 Penggelaran KTR 3 phasa 6 - 16 mm2 untuk SKSR meter 2 Rp -


437 Penggelaran KTR 3 phasa 25 - 70 mm2 meter 1 Rp 21,000
438 Penggelaran KTR 3 phasa 95 - 150 mm2 meter 1 Rp 28,000
439 Penggelaran KTR 3 phasa 240 - 300 mm2 meter 1 Rp 35,000
440 Pemasangan terminasi / end Mof KTR 3 phasa out door set 1 Rp 629,800
441 Pemasangan terminasi / end Mof KTR 3 phasa in door set 1 Rp 524,800
442 Pemasangan Jointing Mof KTR set 1 Rp 1,049,600
443 Pemasangan Opstyp KTR set 1 Rp 419,800
444 Pemasangan Pentanahan ujung / percabangan JTR set 1 Rp 424,800
445 Penarikan kabel TIC 2x10 mm2 plg 2 Rp -
446 Pemasangan Service Wedge Clamp 1 Fasa buah 3 Rp -
447 Pemasangan Tapping Seri/CCO buah 4 Rp -
448 Pemasangan Piercing Tap Connector 1 baut buah 5 Rp -
449 Pemasangan Piercing Tap Connector 2 baut buah 6 Rp -

PEMBONGKARAN
450 Pencabutan tiang besi batang 1 Rp 489,200
451 Pencabutan tiang beton batang 1 Rp 978,600
452 Pembongkaran LVTC 3x35+25 mm2 kms 1 Rp 3,381,600
453 Pembongkaran LVTC 3x50+35 mm2 kms 1 Rp 3,381,600
454 Pembongkaran LVTC 3x70+50 mm2 kms 1 Rp 3,381,600
455 Pembongkaran LVTC 2x35+25 mm2 kms 1 Rp 3,381,600
456 Pembongkaran LVTC 2x25+25 mm2 kms 1 Rp 3,381,600
457 Pembongkaran Assecsories LVTC ( SAA) set 1 Rp 38,800
458 Pembongkaran Assecsories LVTC ( DEA, LAA ) set 1 Rp 42,400
459 Pembongkaran Bundled End Protection set JTR set 1 Rp 35,400
460 Pembongkaran Jaring AL 25 - 35 mm2 kms 1 Rp 3,926,400
461 Pembongkaran Jaring AL 50 - 70 mm2 kms 1 Rp 3,926,400
462 Pembongkaran Jaring BC 6 - 16 mm2 kms 1 Rp 3,926,400
463 Pembongkaran Jaring BC 25 - 50 mm2 kms 1 Rp 3,926,400
464 Pembongkaran Tupang tarik TR set 1 Rp 638,200
465 Pembongkaran Tupang tarik dengan tiang bantu TR set 1 Rp 971,400
466 Pembongkaran tupang tekan TR set 1 Rp 1,284,600
467 Pembongkaran KTR 3 phasa 6 - 16 mm2 (untuk SKSR) meter 2 Rp -
468 Pembongkaran KTR 3 phasa 25 - 70 mm2 meter 1 Rp 31,800

469 Pembongkaran KTR 3 phasa 95 - 150 mm2 (+pms pasir urug & btn pelindung) meter 1 Rp 40,200

470 Pembongkaran KTR 3 phasa 240 - 300 mm2 (+pms pasir urug & btn pelindung) meter 1 Rp 46,600

471 Pembongkaran Pentanahan ujung / percabangan JTR set 1 Rp 212,600


472 Pembongkaran isolator Tumpu S2 set 1 Rp 84,400
473 Pembongkaran isolator Aspan set 1 Rp 84,400
474 Pembongkaran Travers Tumpu 2 Pole set 1 Rp 84,400
475 Pembongkaran Travers Tumpu 4 Pole set 1 Rp 105,600
476 Pembongkaran Travers Aspan 2 Pole set 1 Rp 84,400
477 Pembongkaran Travers Aspan 4 Pole set 1 Rp 105,600
478 Menegakkan tiang besi yang miring batang 1 Rp 845,400
479 Menegakkan tiang beton yang miring batang 1 Rp 981,600
480 Pengencangan (perbaikan andongan) kms 1 Rp 278,800
481 Menurunkan/menggeser TR/ untuk pek. TM. Double S. kms 1 Rp 5,121,200
482 Pembongkaran 1 kabel tanah SUTR di bawah berm meter 1 Rp 213,200
483 Pembongkaran 2 kabel tanah SUTR di bawah berm meter 1 Rp 252,000
484 Pembongkaran 3 kabel tanah SUTR di bawah berm meter 1 Rp 378,000
485 Pembongkaran 5 kabel tanah SUTR di bawah berm meter 1 Rp 494,400
486 Pembongkaran 1 kabel tanah SUTR di bawah trotar meter 1 Rp 213,200
487 Pembongkaran 1 kabel tanah SUTR di bawah jalan aspal + Material meter 1 Rp 1,150,400
488 Pembongkaran KTR 3 phasa 25 - 70 mm2 meter 1 Rp 31,800
489 Pembongkaran KTR 3 phasa 95 - 150 mm2 meter 1 Rp 28,000
490 Pembongkaran KTR 3 phasa 240 - 300 mm2 meter 1 Rp 35,000

PEMELIHARAAN
491 Pengecatan tiang besi TR + Material batang 1 Rp 752,600
492 Perbaikan Pentanahan ujung / percabangan JTR set 1 Rp 208,600
493 Menegakkan tiang besi yang miring batang 1 Rp 845,400
494 Menegakkan tiang beton yang miring batang 1 Rp 981,600
495 Perbaikan tiang besi kropos (material+las) buah 1 Rp 1,778,800
496 Pengencangan baut-baut sambungan ( Konector, skun, terminal, dll ) buah 1 Rp 17,600
497 Pengencangan (perbaikan andongan) gawang 1 Rp 278,800
498 Pembersihan rangka layang - layang, dll titik 1 Rp 106,000
499 Perbaikan tupang tarik buah 1 Rp 177,200
500 Perbaikan posisi tupang tekan set 1 Rp 419,200

PEKERJAAN JASA LAINNYA


501 Angkutan Darat Rp/Ton.km 1 Rp -
502 Angkutan Darat Medan Berat Rp/Ton.km 1 Rp -
503 Angkutan Laut Rp/Ton.km 1 Rp -

Gardu dalam
504 Biaya Pelaksanaan Komunikasi bermakna & Written Agreement 1 Rp -
lahan warga

505 Pekerjaan perampalan pohon kms 1 Rp -


HARGA PENAWARAN JASA JTM, JTR, GARDU DISTRIBUSI
CLUSTER PROPINSI SULAWESI BARAT PT ..........
JASA KONSTRUKSI DAN PEMELIHARAAN TAHUN 2022
PLN UNIT INDUK WILAYAH SULSELRABAR

HARGA
No URAIAN KEGIATAN SAT VOL PENAWARAN
JASA

Pekerjaan Tebang Pohon (setara pohon kelapa/pohon berkayu dengan


506 pohon 1 Rp -
diameter diatas 30 cm/pohon produktif)
507 Pembetonan selubung tiang besi 9-11 mm batang 1 Rp -
508 Pembetonan selubung tiang besi 12 mm batang 1 Rp -
509 Pembetonan selubung tiang besi 13 mm batang 1 Rp -

JUMLAH Rp 1,394,658,500
PPn 11% Rp 153,412,435
JUMLAH TOTAL Rp 1,548,070,935