PT.

TUNAS MITRA NUSANTARA

BILL OF MATERIAL
SPH No. : 2011-041
Client : PT. Pertamina (persero), Kantor Pusat
Project : Relokasi Grounding

No. Description Brand QTY Harga Satuan Jumlah Harga Total

1 Relokasi Grounding Penyalur Petir dan SBTI 1 unit Rp. 46.760.000


Geounding Penyalur Petir
- Titik grounding Max. 2Ω cooper rod Lokal 1 ttk 12.500.000 12.500.000
- Isothermic bonding Cadweld 6 ttk 500.000 3.000.000
- Resin jointing 3M 2 bh 1.500.000 3.000.000
- Grounding bar 50x10 mm - 1 bh 750.000 750.000
- Busbar isolator Socomec 2 bh 200.000 400.000
- Cable lug 120mm² GAE 3 bh 120.000 360.000
- Grounding pit (bak kontrol) 400x400x400 mm, penutup plate 5mm - 1 set 4.500.000 4.500.000
- Pipa galvanish dia 2" medium - 10 btg 650.000 6.500.000
- Gali dan urug jalan aspal - 15 mtr 250.000 3.750.000
- Pengaspalan kembali W 400mm - 15 mtr 300.000 4.500.000
- Jasa pekerjaan - 1 lot 7.500.000 7.500.000

Geounding Penyalur SBTI Rp. 48.515.000


- Titik grounding Max. 1Ω cooper rod Lokal 1 ttk 18.540.000 18.540.000
- Isothermic bonding Cadweld 4 ttk 515.000 2.060.000
- Resin jointing 3M 1 bh 2.575.000 2.575.000
- Grounding bar 50x10 mm - 1 bh 1.200.000 1.200.000
- Busbar isolator Socomec 2 bh 200.000 400.000
- Cable lug 120mm² GAE 2 bh 120.000 240.000
- Grounding pit (bak kontrol) 400x400x400 mm - 1 set 4.500.000 4.500.000
- Pipa galvanish dia 2" - 5 btg 650.000 3.250.000
- Gali dan urug jalan aspal - 15 mtr 250.000 3.750.000
- Pengaspalan kembali W 400mm - 15 mtr 300.000 4.500.000
- Jasa pekerjaan - 1 lot 7.500.000 7.500.000

2 Pengecekan Head Penyalur Petir 1 unit Rp. 10.500.000


- Assesment Head penyalur petir EF 2 bh 5.000.000 10.000.000
- Data hasil pengecekan - 1 lot 500.000 500.000
Catatan :
- Tidak termasuk penggantian komponen, jika ditemukan kerusakan
- Jika diperlukan penggantian akan ditawarkan kemudian