Anda di halaman 1dari 45

BOQ

NAMA PEKERJAAN : Pembangunan Padepokan Perisai Diri Bali di Denpasar


LOKASI : Denpasar

NO URIAN PEKERJAAN Satuan Volume Harga satuan (Rp.) Pajak (%) Pajak (Rp.) Total (Rp.)

A. PEKERJAAN BANGUNAN GEDUNG


I PEKERJAAN PERSIAPAN
1 Pengukuran/uitzet dan bowplank m1 130.00 70,848.20 10.00 921,026.60 10,131,292.60
2 Pembersihan m2 1,000.00 16,000.00 10.00 1,600,000.00 17,600,000.00
3 Papan nama proyek ls 1.00 598,747.50 10.00 59,874.75 658,622.25
II PEKERJAAN KESEHATAN KESELAMATAN KERJA (K3)
1 Sosialisasi dan Promosi K3
2 Spanduk bh 2.00 200,000.00 10.00 40,000.00 440,000.00
3 Rambu-rambu K3 bh 8.00 50,000.00 10.00 40,000.00 440,000.00
4 Fasilitas sarana kesehatan (kotak P3K) set 3.00 2,500,000.00 10.00 750,000.00 8,250,000.00
5 Kelengkapan pekerja
6 Helm proyek bh 10.00 45,000.00 10.00 45,000.00 495,000.00
7 Rompi proyek bh 10.00 45,000.00 10.00 45,000.00 495,000.00
8 Masker bh 10.00 15,000.00 10.00 15,000.00 165,000.00
9 Sepatu proyek psg 10.00 95,000.00 10.00 95,000.00 1,045,000.00
10 Sarung tangan proyek psg 10.00 15,000.00 10.00 15,000.00 165,000.00
11 Kaca mata las bh 2.00 50,000.00 10.00 10,000.00 110,000.00
12 Safety body harnes bh 4.00 250,000.00 10.00 100,000.00 1,100,000.00
III PEKERJAAN TANAH
1 Galian tanah setempat m3 69.36 74,500.00 10.00 516,732.00 5,684,052.00
2 Galian tanah menerus m3 184.36 74,500.00 10.00 1,373,482.00 15,108,302.00
3 Urugan kembali m3 84.57 54,000.00 10.00 456,678.00 5,023,458.00
4 Urugan peninggian lantai m3 284.75 179,640.00 10.00 5,115,249.00 56,267,739.00
5 Pemadatan m2 671.50 54,000.00 10.00 3,626,100.00 39,887,100.00
IV PEKERJAAN PONDASI
1 Pondasi telapak
2 Begesting m2 42.00 168,749.00 10.00 708,745.80 7,796,203.80
3 Pembesian kg 2,700.00 11,622.50 10.00 3,138,075.00 34,518,825.00
4 Beton K 300 m3 18.00 936,981.75 10.00 1,686,567.14 18,552,238.58
5 Pondasi batu pecah m3 115.23 399,302.81 10.00 4,601,166.28 50,612,829.13
V PEKERJAAN BETON
1 Kolom pedestal 450x300 mm
2 Begesting (2x Pakai ) m2 27.00 0.00 10.00 0.00 0.00
3 Pembesian kg 486.00 0.00 10.00 0.00 0.00
4 Beton K 300 m3 2.43 0.00 10.00 0.00 0.00
5 Slooft 250x350 mm
6 Begesting (2x pakai ) m2 161.32 0.00 10.00 0.00 0.00
7 Pembesian kg 3,456.00 0.00 10.00 0.00 0.00
8 Beton K 300 m3 17.28 0.00 10.00 0.00 0.00
9 Balok 250x350 mm
10 Begesting (2x Pakai ) m2 76.29 0.00 10.00 0.00 0.00
11 Pembesian kg 1,054.50 0.00 10.00 0.00 0.00
12 Beton K 300 m3 7.03 0.00 10.00 0.00 0.00
13 Talang beton
14 Begesting m2 108.40 0.00 10.00 0.00 0.00
15 Pembesian m2 2,290.00 0.00 10.00 0.00 0.00
16 Beton K 300 m3 11.45 0.00 10.00 0.00 0.00
17 Meja Beton washtafel dan zink
18 Begesting m2 7.91 0.00 10.00 0.00 0.00
19 Pembesian m2 7.91 0.00 10.00 0.00 0.00
20 Beton K 175 m3 0.79 0.00 10.00 0.00 0.00
VI PEKERJAAN KONSTRUKSI BAJA
1 Kolom WF 300x150x6,5x9 kg 2,642.40 0.00 10.00 0.00 0.00
2 Kuda - kuda WF 298X149X5,5X8 kg 3,872.00 0.00 10.00 0.00 0.00
3 Balok WF 300x150x5,5x8 kg 1,280.00 0.00 10.00 0.00 0.00
4 Gording CNP 150x65x20x3,2 kg 1,980.00 0.00 10.00 0.00 0.00
5 Plat 5 mm kg 421.20 0.00 10.00 0.00 0.00
6 Plat 10 mm kg 233.30 0.00 10.00 0.00 0.00
7 Baut Baja A325 19 x 140 bh 72.00 0.00 10.00 0.00 0.00
8 Baut Baja A325 16 x 140 bh 756.00 0.00 10.00 0.00 0.00
VII PEKERJAAN ATAP
RUANG BERTANDING
1 Reng baja ringan m2 510.76 0.00 10.00 0.00 0.00
2 Pasangan Aluminium Foil m2 593.91 0.00 10.00 0.00 0.00
3 Atap genteng metal m2 593.91 0.00 10.00 0.00 0.00
4 Lisplank kalsiplank m1 84.30 0.00 10.00 0.00 0.00
VIII MESS DAN SEKRETARIAT
1 Rangka atap baja ringan m2 160.00 0.00 10.00 0.00 0.00
2 Atap genteng metal m2 160.00 0.00 10.00 0.00 0.00
3 Lisplank kalsiplank m1 52.00 0.00 10.00 0.00 0.00
IX PEKERJAAN DINDING
1 Dinding Batako m2 1,090.62 100,463.44 10.00 10,956,743.68 120,524,180.52
2 Plesteran dinding m2 2,047.34 54,666.00 10.00 11,191,988.03 123,111,868.36
3 Acian dinding m2 2,047.34 35,350.00 10.00 7,237,346.90 79,610,815.90
4 Kolom praktis m1 376.40 63,320.81 10.00 2,383,395.38 26,217,349.15
5 Ring praktis m1 94.00 63,320.81 10.00 595,215.64 6,547,372.00
6 Kramik dinding kamar mandi dan pantry 20x20 cm m2 128.72 212,515.00 10.00 2,735,493.08 30,090,423.88
X PEKERJAAN LANTAI
1 Rabatan lantai beton K 125 m3 67.15 0.00 10.00 0.00 0.00
2 Kramik lantai polish 40x40 cm m2 601.48 0.00 10.00 0.00 0.00
3 Kramik teras dan lantai KM kasar 40x40 cm m2 107.82 0.00 10.00 0.00 0.00
4 Kramik meja beton 40x40 cm m2 8.70 0.00 10.00 0.00 0.00
XI PEKERJAAN LANGIT - LANGIT
1 Plafond gypsum rangka hollow m2 240.00 0.00 10.00 0.00 0.00
2 List gypsum m1 142.00 0.00 10.00 0.00 0.00
XII PEKERJAAN PINTU DAN JENDELA
1 Kusen pintu P2 aluminium m1 31.00 0.00 10.00 0.00 0.00
2 Kusen pintu P3 aluminium m1 63.80 0.00 10.00 0.00 0.00
3 Kusen jendela J1 Aluminium m1 96.00 0.00 10.00 0.00 0.00
4 Kusen jendela J2 Aluminium m1 30.00 0.00 10.00 0.00 0.00
5 Kusen Jendela J3 Aluminium m1 97.20 0.00 10.00 0.00 0.00
6 Daun pintu P2 unit 5.00 0.00 10.00 0.00 0.00
7 Daun pintu P3 unit 11.00 0.00 10.00 0.00 0.00
8 Rolling door aluminium P1 m2 9.60 0.00 10.00 0.00 0.00
9 Daun Jendela J1 Aluminium unit 8.00 0.00 10.00 0.00 0.00
10 Daun jendela J2 aluminium unit 4.00 0.00 10.00 0.00 0.00
11 Daun jendela J3 aluminium unit 6.00 0.00 10.00 0.00 0.00
12 Partisi toilet
13 Pasangan Rangka partisi aluminium 4 m1 138.00 0.00 10.00 0.00 0.00
14 Pasangan PVC plank m2 34.41 0.00 10.00 0.00 0.00
15 Daun pintu partisi bh 16.00 0.00 10.00 0.00 0.00
16 Roster teracotta m2 38.40 0.00 10.00 0.00 0.00
XIII PEKERJAAN PENGECATAN WATERPROOFING
1 Cat dinding dalam ex vinilex m2 1,023.67 21,189.50 10.00 2,169,105.55 23,860,161.01
2 Cat dinding luar ex Aquaprooft m2 1,177.65 40,889.00 10.00 4,815,293.09 52,968,223.94
3 Cat plafond ex vinilex m2 240.00 10,296.00 10.00 247,104.00 2,718,144.00
4 Polituran kusen ex impra m1 12.00 34,636.60 10.00 41,563.92 457,203.12
5 Polituran daun pintu ex impra m2 7.56 34,636.60 10.00 26,185.27 288,037.97
6 Waterproofing talang m2 96.36 40,889.00 10.00 394,006.40 4,334,070.44
PEKERJAAN MEP
XIV INSTALASI LISTRIK
1 Instalasi lampu titik 56.00 0.00 10.00 0.00 0.00
2 Instalasi stop kontak titik 20.00 0.00 10.00 0.00 0.00
3 Instalasi exaust fan titik 12.00 0.00 10.00 0.00 0.00
4 Penangkal petir 1 tombak
5 Instalasi Tiang/tombak penangkal petir bh 1.00 0.00 10.00 0.00 0.00
6 Instalasi Kabel BC dan pipa conduit m 27.00 0.00 10.00 0.00 0.00
7 Instalasi Ground rod bh 1.00 0.00 10.00 0.00 0.00
8 Amprah PLN 7700 VA ls 1.00 0.00 10.00 0.00 0.00
9 INSTALASI PANEL
10 Kabel group grup 9.00 0.00 10.00 0.00 0.00
11 Pemasangan Kabel Power m1 27.50 0.00 10.00 0.00 0.00
12 Box Panel unit 1.00 0.00 10.00 0.00 0.00
XV ARMATUR
1 Lampu downlight bh 41.00 0.00 10.00 0.00 0.00
2 Lampu halogen bh 6.00 0.00 10.00 0.00 0.00
3 Stop kontak bh 20.00 0.00 10.00 0.00 0.00
4 Saklar tunggal bh 16.00 0.00 10.00 0.00 0.00
5 Saklar ganda bh 9.00 0.00 10.00 0.00 0.00
6 Exaust fan bh 10.00 0.00 10.00 0.00 0.00
7 Turbine ventilator bh 3.00 0.00 10.00 0.00 0.00
8 Celling fan bh 6.00 0.00 10.00 0.00 0.00
XVI SANITAIR
1 Kloset duduk ex. Toto set 8.00 2,694,254.40 10.00 2,155,403.52 23,709,438.72
2 Wastafel ex. Toto set 11.00 881,595.25 10.00 969,754.77 10,667,302.51
3 Urinoir ex. Toto set 4.00 2,653,080.26 10.00 1,061,232.10 11,673,553.13
4 Shower ex. Toto set 8.00 0.00 10.00 0.00 0.00
5 Keran bh 4.00 38,003.50 10.00 15,201.40 167,215.40
6 Floor Drain ex. Toto bh 10.00 196,920.00 10.00 196,920.00 2,166,120.00
7 Tempat sabun ex. Toto bh 8.00 0.00 10.00 0.00 0.00
8 Kaca cermin 60x60cm bh 11.00 0.00 10.00 0.00 0.00
XVII PLUMBING
1 Pipa air hujan PVC 4 m1 24.00 0.00 10.00 0.00 0.00
2 Pipa air kotor PVC 4 m1 60.00 0.00 10.00 0.00 0.00
3 Pipa air bersir PVC 1/2 m1 72.00 0.00 10.00 0.00 0.00
4 Pipa air bersih dari tangki air ke sumur bor PVC 3/4 m1 12.00 0.00 10.00 0.00 0.00
5 Septic tank unit 1.00 0.00 10.00 0.00 0.00
6 Water tank 1100 L unit 2.00 0.00 10.00 0.00 0.00
7 Sumur bor ls 1.00 0.00 10.00 0.00 0.00
8 Pompa submersible unit 1.00 0.00 10.00 0.00 0.00
9 Pompa pendorong unit 1.00 0.00 10.00 0.00 0.00
XVIII LANSKAP
1 Paving polos 20x20x6 cm m2 176.79 0.00 10.00 0.00 0.00
2 Tanah Subur m3 9.00 0.00 10.00 0.00 0.00
3 Tanaman rumput mutiara m2 36.00 0.00 10.00 0.00 0.00
4 Penanaman Tanaman Hias Jempiring dan Puring m2 15.00 0.00 10.00 0.00 0.00
5 Penanaman Tanaman Hias Tabebuya btg 6.00 0.00 10.00 0.00 0.00
TOTAL 793,657,142.41

TERBACA :

Singaraja, 05 Juli 2020


PT. BALI JAYA CONTRACTORS

I Wayan Yanto, ST.


Direktur
REKAPITULASI DAFTAR HARGA SATUAN BAHAN
TAHUN 2020

NO NAMA BARANG SATUAN HARGA 2020

1 2 3 4

1 Air (Harga Air Industri PDAM 2018) Ltr 16.00


2 Alang - Alang Kelas 1 Lbr 22,500.00
3 Aspal Ltr 10,520.00
4 Aluminium Foil engkel/Insulasi m2 3,060.00
5 Aluminium Rollingdoor m2 390,000.00
6 Aluminium Profil m1 105,000.00
7 Amplas Halus Lbr 3,560.00
8 Amplas Kasar Lbr 3,810.00
9 Asbes Gelombang 180 x 80 x 5 mm Lbr 32,660.00
10 Asbes Gelombang 2,5 M x 0,92 M x 5mm Lbr 60,000.00
11 Asbes Rata 2 x 1 m x 4 mm Lbr 34,400.00
12 Plat asbes 6 mm Lbr 29,900.00
13 Bambu Besar (d=10-12 cm) Bt 9,640.00
14 Bambu Sedang (d=6-9 cm) Bt 9,070.00
15 Bambu Kecil (d=<5 cm) Bt 8,570.00
16 Batako Kualitas I Bh 3,100.00
17 Bata Ringan 7,5/60/20 cm Bh 8,500.00
18 Bata Ringan 10/60/20 cm Bh 11,970.00
19 Beton Kansteen 50x30x15 K225 m1 72,500.00
20 Beton Kansteen Segilima 50x15x20 K225 m1 82,670.00
21 Beton Kansteen Kursi 15x40x60 K300 m1 103,330.00
22 Bak cuci piring Bh 252,660.00
23 Batu Bata Pasangan Kelas I Bh 1,400.00
24 Batu Bata Gosok Klas I Bh 3,000.00
25 Bata Pelapis/Expose Bh 2,800.00
26 Batu Kali/Batu Belah M3 170,960.00
27 Batu Hitam Karangasem m2 1,200,000.00
28 Bathcuip porselen Bh 3,250,000.00
29 Besi Siku L.30.30.3 Kg 46,000.00
30 Besi Beton Kg 6,700.00
31 Besi Strip / Plat Jepit Kuda-Kuda Btg 8,900.00
32 Besi Profil WF Kg 14,700.00
33 Bentala 60 cm Bh 72,500.00
34 Bentala 50 cm Bh 145,000.00
35 Bentala 40 cm Bh 46,000.00
36 Bubungan Asbes Bh 35,000.00
37 Buis Beton 25 x 75 Cm Bh 66,670.00
38 Buis Beton 30x75 Cm Bh 75,000.00
39 Buis Beton 50x75 Cm Bh 126,670.00
40 Buis Beton 60 x 50 cm Bh 153,330.00
41 Buis Beton 80 x 50 Cm Bh 167,500.00
42 Buis Beton 100 x 50 Cm Bh 206,250.00
43 Bubungan Stel gelombang Lbr 24,200.00
44 Tutup Buis Beton 80 x 50 Cm Bh 143,330.00
45 Tutup Buis Beton 100 x 50 Cm Bh 161,670.00
46 Kalsiboard Kalsi (4,5 x 1220 x 2420) mm lbr 62,610.00
47 Cat Dasar ( Vinilex) Kg 28,370.00
48 Cat kayu Emco Kg 67,230.00
49 Cat Besi ( avian) Kg 59,130.00
50 Cat Meni kayu ( altec) Kg 34,890.00
51 Cat Meni besi Kg 32,930.00
52 Cat Tembok Vinilex Kg 29,350.00
53 Cat Tembok mowilex ltr 72,330.00
54 Cat Tembok catylax Kg 22,400.00
55 Cat Tembok dulux interior ltr 76,530.00
56 Cat Tembok dulux weathersield ltr 117,270.00
57 Cat waterproofing exs no drop Kg 47,120.00
58 Cat waterproofing exs bitumen Kg 95,000.00
59 Clear Gloss Kg 65,270.00
60 Closet Duduk Toto CW 421 Bh 2,122,490.00
61 Closet Jongkok toto CE 7 Bh 321,630.00
62 Door stoper ( solid, griff, dll) Bh 55,200.00
63 Door closer ( solid, griff, dll) Bh 295,830.00
64 Door holder ( solid, griff, dll) Bh 57,450.00
65 Engsel Pintu ( solid, griff, dll) Bh 24,400.00
66 Engsel jendela ( solid, griff, dll) Bh 20,070.00
67 Engsel Nilon ( solid, griff, dll) Bh 10,400.00
68 Engsel angin ( solid, griff, dll) Bh 21,930.00
69 Expagnolet ( solid, griff, dll) Bh 74,300.00
70 Fiber Glass (bak ) Bh 245,000.00
71 Floor Drain ( Onda) Bh 155,480.00
72 Formite Bh 1,000.00
73 Gedeg Klas I M2 28,000.00
74 Genteng pelentong kecil ( Pejaten) Biji 1,400.00
75 Genteng Kaca Biji 15,250.00
76 Genteng Plentong besar Biji 2,500.00
77 Genteng Beton Biji 3,000.00
78 Genteng Kodok( good year) Biji 4,800.00
78 Genteng Kodok( Lestari) Biji 5,000.00
79 Genteng glazur( Mclass, KIA) Biji 11,500.00
80 Genteng Gemini ( good year) Biji 6,100.00
81 Genteng Metal t = 0.25 mm berpasir Lbr 36,500.00
82 Genteng Metal t = 0.3 mm Lbr 32,000.00
83 Genteng Bubungan pelentong kecil Biji 4,200.00
84 Genteng Bubungan/Nok Beton Biji 18,800.00
85 Genteng Bubungan Plentong besar/super Biji 17,250.00
86 Genteng Bubungan kodok ( Good year) Biji 18,200.00
86 Genteng Bubungan kodok ( Lestari) Biji 19,000.00
87 Genteng Bubungan Glazur (Mclass, KIA) Biji 26,330.00
88 Glass Block Biji 25,080.00
89 Grendel Bh 16,580.00
90 Gypsum( Elephant) Lbr 56,250.00
91 Granito 60 x 60 cm Bh 58,770.00
92 Granit Plin 10 x 60 cm Bh 26,000.00
93 Ijuk Kg 8,000.00
94 Kaca Bening 3 MM M2 73,230.00
95 Kaca Bening 5 MM M2 107,550.00
96 Kaca Bening 8 MM M2 190,000.00
97 Kaca Buram12 MM M2 350,000.00
98 Kaca Cermin 5 MM M2 228,550.00
99 Kaca Cermin 8 MM M2 220,000.00
100 Kaca Nako M2 115,000.00
101 Kaca Ryben 3 MM M2 131,130.00
102 Kaca Ryben 5 MM M2 132,670.00
103 Kaca Ryben 5 MM Ps 26,500.00
104 Karung Plastik Bh 3,500.00
105 Kawat Baja Bindrat Kg 22,500.00
106 Kawat Beton/ Bindrat Kg 20,500.00
107 Kawat Berduri M1 94,990.00
108 Kawat jaring m2 18,250.00
109 Kayu Bingkirai Balok M3 10,850,770.00
110 Kayu Bingkirai Papan / Usuk / Reng M3 11,333,330.00
111 Kayu Jati Balok M3 25,000,000.00
112 Kayu Jati Papan M3 25,000,000.00
113 Kayu Kamper Balok M3 8,417,180.00
114 Kayu Kamper Papan/ Usuk / Reng M3 9,088,610.00
115 Kayu Kruing Balok M3 7,217,070.00
116 Kayu Kruing Papan / Usuk / Reng M3 7,737,580.00
117 Kayu Meranti Balok M3 4,500,000.00
118 Kayu Meranti Papan / Usuk / Reng M3 4,500,000.00
119 Kayu Dolken (Pekerjaan Sementara) Btng 47,000.00
120 Kayu Merbau Balok M3 14,750,000.00
121 Kayu Merbau Papan M3 16,750,000.00
122 Kayu Terentang/Begesting M3 2,200,000.00
123 Kayu Albesia Balok M3 2,916,500.00
124 Kayu Albesia Papan / Usuk M3 2,027,600.00
125 Kayu Nangka Balok M3 6,187,000.00
126 Kayu Cempaka Balok M3 5,500,000.00
127 Kayu Profil (List) M1 17,500.00
128 Homogenius Tile (Ggranite Tile) 60cmx60cm warna ( Granito) Bh 123,300.00
129 Keramik 40 cm x 40 cm warna ( KIA, Platinum) Bh 10,230.00
129 Keramik 50 cm x 50 cm warna ( KIA, Platinum) Bh 11,000.00
130 Keramik dinding 25 cm x 40 cm warna ( KIA, Platinum) Doos 67,010.00
131 Keramik 30 cm x 30 cm Polos ( KIA, Platinum) Doos 42,730.00
132 Keramik 30 cm x 30 cm warna ( KIA, Platinum) Doos 48,300.00
133 Keramik Motif Batu Sikat 40 cm x 40 cm ( KIA, IKAD, Platinum) Bh 10,500.00
134 Keramik 33 cm x 33 cm Polos Doos 100,000.00
135 Keramik 33 cm x 33 cm warna Doos 100,000.00
136 Keramik dinding 20 cm x 25 cm warna ( KIA) Doos 62,400.00
137 Keramik 20 cm x 20 cm tekstur Doos 59,830.00
138 Keramik 25 x 25 tekstur Doos 60,500.00
139 Kerawang /roster PC Bh 8,300.00
140 Kerikil Beton M3 192,590.00
141 Kuas besar Set 20,670.00
142 Kunci antik/ handle style Bali Bh 85,950.00
143 Kunci tanam Set 90,300.00
144 Kunci Slot Bh 65,000.00
145 Kuas kecil Bh 5,330.00
146 Keran Air Bh 26,890.00
147 Lampu TL 20 Watt komplit Bh 125,700.00
148 Lampu TL 40 Watt komplit Bh 149,500.00
149 Lampu Pijar 40 Watt Bh 10,500.00
150 Keran / Ledang ( onda) Bh 23,300.00
151 Keran Sink ( onda) Bh 98,000.00
152 Keran wastafel ( onda) Bh 92,600.00
153 List Gypsum Stdr M1 13,180.00
154 Lem Kayu Ltr 14,850.00
155 Lem Pipa Kg 88,200.00
156 Hollow Galvanis 40/40/0,4 mm m1 34,300.00
157 Minyak Olie Ltr 25,000.00
158 Minyak Bekisting Ltr 5,200.00
159 Murda 30 cm (paras cor) Bh 87,500.00
160 Murda 25 cm Bh 75,000.00
161 Murda 20 cm Bh 52,000.00
162 Melamic Kg 57,500.00
163 Mortar siap pakai ( MU) kg 15,000.00
164 Paku List kg 20,250.00
165 Parquet kayu M2 215,700.00
166 Paku 5 -12 cm Kg 17,850.00
167 Paku Seng Import Kg 38,920.00
168 Paku Skrup 1/2 bh 40.00
169 Paku Skrup 2" bh 270.00
170 Paku Skrup 3" Bh 480.00
171 Paku Skrup fisher S8 Bh 1,000.00
172 Paku 5 cm (reng) Kg 19,820.00
173 Paku pancing 60 x 230 Kg 20,000.00
174 Pasir Beton M3 193,300.00
175 Pasir Pasang M3 170,150.00
176 Pasir Urug M3 114,500.00
177 Paving Stone 6 Cm PC polos K225 M2 73,750.00
178 Paving Stone 6 Cm PC Full colour K 225 M2 95,000.00
179 Paving Stone 8 Cm PC polos K 225 M2 80,000.00
180 Paving Stone 8 Cm PC full merah K 225 M2 95,000.00
181 Plamir Tembok Kg 14,720.00
182 Plywood 3 MM Lbr 59,380.00
183 Plywood 4 MM Lbr 69,880.00
184 Plywood 6 MM Lbr 81,880.00
185 Plywood 9 MM Lbr 119,250.00
186 Plywood 12 MM Lbr 189,170.00
187 Plywood 18 MM Lbr 270,980.00
188 Politur Ultran Kg 69,000.00
189 Rel Pintu sorong M 85,420.00
190 Sanding Kg 62,400.00
191 Semen PC Kg 1,200.00
192 Semen warna/semen grouting( MU, Sika) Kg 13,430.00
193 Seng Bjls 0,32 Lbr 45,000.00
194 Seng plat 3" x 6" BJLS 28 Lbr 53,000.00
195 Seng plat (0,30 mm) 180 x 90 cm Lbr 55,000.00
196 Seng Gelombang 3" x 6" Lbr 54,380.00
197 Seseh Balok Dolken 3 m Bt 100,000.00
198 Seal tape Bh 4,540.00
199 Sealant Bh 33,830.00
200 Sirtu M3 127,200.00
201 Spandek (0,25x620x67)cm lbr 220,950.00
202 Trimdek warna (0,25x620x75)cm lbr 220,000.00
203 Trimdek biasa (0,25x620x75)cm lbr 221,930.00
204 Soda Api Ltr 30,940.00
205 Spring Knip Bh 25,500.00
206 Tali Ijuk kg 12,300.00
207 Tanah Urug M3 95,810.00
208 Teak Oil Ltr 52,950.00
209 Teak wood 4 mm (120 x 240 cm) Lbr 80,750.00
210 Tegel PC 20 x 20 Cm polos Bh 2,200.00
211 Tegel PC 20/20 Cm warna Bh 3,200.00
212 Tinner Ltr 29,300.00
213 Util (ikut celedu) 60 CM Biji 62,400.00
214 Util (ikut celedu) 70 CM Biji 72,500.00
215 Util (ikut celedu) 80 CM Biji 82,500.00
216 Urinoir Toto u57 Bh 2,431,630.00
217 Vernis ( ultran, Imra) Kg 72,000.00
218 Wood Filer ( mowilek, ultran, impra) Kg 39,500.00
219 Washtafel Toto Bh 522,450.00
220 Waterdrain Bh 55,000.00
221 woodstain Kg 71,710.00
222 Solar Industri Ltr 12,470.00
223 Saka Kamper ukir 11/11 cm Bh 1,300,000.00
224 Saka Bingkirai ukir 11/11 cm Bh 1,500,000.00
225 Saka Jati ukir11/11 cm Bh 1,700,000.00
226 Pementang Kamper ukir 10 x 20 cm m1 1,400,000.00
227 Pementang Jati ukir 10 x 20 cm m1 1,650,000.00
228 Dedeleg Jati Ukir m1 1,525,000.00
229 Canggah wang Jati Ukir psg 600,000.00
230 Ring - ring ukir m1 31,200.00
231 Kencut Saka Bh 133,330.00
232 Ukiran Penyambung Tapel Lis Plang/Ris M1 20,800.00
233 Tapel Lis Plang/Ris Set 195,000.00
234 Tapel Ring - ring psg 45,000.00
235 Dupak Saka Bh 60,000.00
236 Paras Ornamen (20 x 60 x 5 cm) BH 350,000.00
237 Paduraksa batu hitam Unit 2,500,000.00
238 Bataran batu hitam m2 1,625,000.00
239 Candi Bentar batu hitam t = 3,5 m Unit 31,500,000.00
240 Candi Bentar paras bata t = 3,7 m Unit 15,400,000.00
241 Candi Bentar paras bata t = 2,5 m Unit 13,750,000.00
242 Paduraksa paras bata (lbr. kepala bag.tengah max 0.4 cm) Unit 1,100,000.00
243 Pipa Galvanis 1/2 " M1 41,400.00
244 Pipa Galvanis 3/4 " M1 46,700.00
245 Pipa Galvanis 1 " M1 56,300.00
246 Pipa Galvanis 1 1/2" M1 113,900.00
247 Pipa Galvanis 3" M1 230,500.00
248 Pipa Galvanis 4" M1 400,000.00
249 Pipa PVC tipe AW Ø 0,5" P = 4 m ( Rucika, Vinilon, Maspion) M1 5,930.00
250 Pipa PVC tipe AW Ø 0,75" P = 4 m ( Rucika, Vinilon, Maspion) M1 7,910.00
251 Pipa PVC tipe AW Ø 1" P = 4 m ( Rucika, Vinilon, Maspion) M1 11,080.00
252 Pipa PVC tipe AW Ø 1,5" P = 4 m ( Rucika, Vinilon, Maspion) M1 18,890.00
253 Pipa PVC tipe AW Ø 2" P = 4 m ( Rucika, Vinilon, Maspion) M1 24,080.00
254 Pipa PVC tipe AW Ø 3" P = 4 m ( Rucika, Vinilon, Maspion) M1 48,060.00
255 Pipa PVC tipe AW Ø 4" P = 4 m ( Rucika, Vinilon, Maspion) M1 75,990.00
256 Pipa PVC tipe D Ø 6" P = 4 m ( Rucika, Vinilon, Maspion) M1 110,670.00
257 Pipa PVC R-R OD dia OD 63 mm, S12,5 M1 34,100.00
258 Pipa PVC R-R OD dia OD 75 mm, S12,5 M1 48,500.00
259 Pipa PVC R-R OD dia OD 90 mm, S12,6 M2 68,600.00
260 Pipa PVC R-R OD dia OD 110 mm, S12,7 M3 100,000.00
261 Minyak Bekisting Liter 5,000.00
-
BATU ALAM -
261 Paras Abu-abu M2 70,090.00
262 Paras Kerobokan M2 88,390.00
263 Paras Kelating M2 70,090.00
264 Paras Jogja M2 165,000.00
265 Batu Palimanan M2 120,000.00
266 Batu Jogja M2 102,500.00
267 Batu Candi T = 2 cm M2 97,500.00
268 Batu Candi T = 3 cm M2 170,000.00
269 Batu Candi T = 5 cm M2 190,000.00
269 Batu Hitam Karangasem M2 1,200,000.00
270 Batu Andesite T = 2 cm M2 150,000.00
271 Batu Andesite T = 3 cm M2 250,000.00
272 Bata Press Pejaten T = 5cm Bh 2,600.00
273 Bata Press Pejaten T = 6cm Bh 3,000.00
274 Bata Pasang Bh 1,580.00
275 Bata Gosok Kelas I Bh 3,000.00
-
BESI DAN BAJA -
Baja Ringan Canai Dingin -
276 Besi Polos U24 (fy=240 kg/mm2) Kg 9,350.00
277 Besi Ulir U35 (fy=320 kg/mm2) Kg 9,860.00
278 Besi Ulir U40 (fy=400 kg/mm2) Kg 10,630.00
279 Baja Profil IWF Kg 11,650.00
280 Baja Profil CNP Kg 6,010.00
281 Wiremesh M5 ukuran : 2,1 x 5,4 m lembar 10,490.00
282 Wiremesh M6 ukuran : 2,1 x 5,4 m lembar 10,960.00
283 Wiremesh M7 ukuran : 2,1 x 5,4 m lembar 10,580.00
284 Wiremesh M8 ukuran : 2,1 x 5,4 m lembar 11,150.00
285 Wiremesh M9 ukuran : 2,1 x 5,4 m lembar 11,150.00
286 Wiremesh M10 ukuran : 2,1 x 5,4 m lembar 11,780.00
287 Wiremesh M12 ukuran : 2,1 x 5,4 m lembar 11,780.00
-
288 Koral Sikat Hitam (1 sak = 8 kg) Sak 28,667.00
289 Koral Sikat Warna Sak 31,504.00
290 Bambu D=8-10 cm Panjang 4 m Btg 8,570.00
-
ELEKTRIKAL -
291 Kabel NYM 3 X 2,5 mm ( Eterna) m' 14,810.00
292 Kabel NYM 3 X 1,5 mm m' 10,920.00
293 Kabel NYM 2 X 2,5 mm m' 11,710.00
294 Kabel NYM 2 X 1,5 mm m' 9,420.00
295 Saklar Tunggal Exs Clipsall Bh 20,480.00
296 Saklar Ganda Exs Clipsall Bh 31,730.00
297 Stop Kontak Exs Clipsall Bh 25,580.00
298 Stop Kontak Outdoor Exs Clipsall Bh 48,950.00
299 Saklar Tunggal Outdoor Exs Clipsall Bh 49,630.00
300 Saklar Ganda Outdoor Exs Clipsall Bh 66,000.00
301 T Dus Bh 4,750.00
302 Klem Kabel Bh 330.00
303 Pipa Listrik m' 2,920.00
304 L Bow Bh 1,750.00
305 Inbow Dus Bh 3,100.00
306 Stop Kontak AC Bh 48,750.00
307 MCB Unit 46,700.00
308 Isolasi bh 5,000.00
309 sock bh 6,000.00
310 M dus bh 4,750.00
311 Downlight 4 " bh 20,000.00
312 Lampu xl 18 watt bh 25,000.00
-
HOLLOW GALVANIS -
308 Hollow Galvanis 35/35/0.6 mm M' 11,250.00
309 Hollow Galvanis 20/20/0.8 mm M' 6,830.00
310 Hollow Galvanis 60/60/1.0 mm M' 37,770.00
311 Spandek 0.25 mm silver M2 38,030.00
312 Spandek 0.25mm biru M2 36,360.00
-
HOLLOW ALLUMINIUM -
313 Hollow Alluminium 40 x 40 mm M 6,420.00
314 Hollow Alluminium 20 x 40 mm M 5,000.00
-
PIPA GALVANIS -
315 Pipa Galvanis 1/2 " M 12,780.00
316 Pipa Galvanis 3/4 " M 16,110.00
317 Pipa Galvanis 1 " M 21,060.00
318 Pipa Galvanis 1 1/4 " M 21,000.00
319 Pipa Galvanis 1 1/2" M 28,670.00
320 Pipa Galvanis 2" M 35,830.00
321 Pipa Galvanis 2 1/2" M 46,000.00
322 Pipa Galvanis 3" M 55,670.00
323 Pipa Galvanis 3" M 55,670.00
-
-
289 Aluminium Jeruk Lbr 55,000.00
290 Main trus C75-0,75 m' 57,000.00
291 Main trus UK 75-0,75 m' 59,000.00
292 Diafragma bh 20,000.00
293 Sepatu UK bh 50,000.00
294 Reng AA 0,45 m' 28,000.00
295 Sekrup reng bh 11,600.00
296 Sekrup main trus bh 15,000.00
297 Dynabol 10 x 65 bh 5,000.00
298 Hollow galvalume 3,5 x 3,5 m' 19,000.00
299 wall angle m' 8,000.00
300 paku beton bh 1,500.00
301 Grendel espagnolet bh 80,000.00
302 Isolasi bh 5,000.00
303 sock bh 6,000.00
304 M dus bh 4,750.00
305 Downlight 4 " bh 20,000.00
306 Lampu xl 18 watt bh 25,000.00
307 Cat KCA Kg 35,000.00
308 Coumpond Kg 22,000.00
309 Box panel uk. 80x60x25 cm Bh 300,000.00
310 box panel 60x40x25 cm Bh 250,000.00
311 MCCB 3 phase 63 ampere Bh 400,000.00
312 MCCB 3 phase 40 ampere Bh 360,000.00
313 MCB 3 phase 25 ampere Bh 320,000.00
314 MCB 3 phase 16 ampere Bh 290,000.00
315 MCB 1 phase 6 ampere Bh 17,000.00
316 MCB 1 phase 10 ampere Bh 47,000.00
317 MCB 1 phase 16 ampere Bh 52,000.00
318 lampu pilot Bh 17,000.00
319 fuse Bh 4,500.00
320 rel MCB M1 14,000.00
321 busbar RST M1 54,000.00
322 busbar netral dan nol Bh 35,000.00
323 Grounding BC 70 mm2 M1 35,000.00
324 Splitzen 1' Bh 75,000.00
325 kabel NYY 4x16 mm2 M1 44,750.00
326 BC 16 mm2 M1 19,000.00
327 ITC 2x2x0,6 mm2 M1 200,000.00
328 Outlet Telepon Bh 25,000.00
329 Pesawat Telepon Bh 120,000.00
330 Celing Speaker Bh 140,000.00
331 Kabel Data UTP 6 M1 225,000.00
332 Outlet Data Bh 42,800.00
333 Kabel NYMHM 2X1,5mm M1 300,000.00
334 Jet Shower Bh 65,000.00
335 Angkur D 19 Bh 29,200.00
336 Baut M16 Bh 8,200.00
-
Pipa -
Harga dari Vendor -
-
337 Pipa PVC tipe AW Ø 0,5" P = 4 m Maspion M1 5,930.00
338 Pipa PVC tipe AW Ø 0,75" P = 4 m Maspion M1 7,910.00
339 Pipa PVC tipe AW Ø 1" P = 4 m Maspion M1 11,080.00
340 Pipa PVC tipe AW Ø 1,5" P = 4 m Maspion M1 18,890.00
341 Pipa PVC tipe AW Ø 2" P = 4 m Maspion M1 24,080.00
342 Pipa PVC tipe AW Ø 3" P = 4 m Maspion M1 48,060.00
343 Pipa PVC tipe AW Ø 4" P = 4 m Maspion M1 75,990.00
344 Pipa PVC tipe AW Ø 5" P = 4 m Maspion M1 85,000.00
345 Pipa PVC tipe AW Ø 6" P = 4 m Maspion M1 110,670.00
346 Pipa PVC tipe AW Ø 12" P = 4 m Maspion M1 220,000.00
347 Pipa Maspion D 1-1/2 M1 41,600.00
348 Pipa Maspion D 1-1/4 M1 36,680.00
349 Pipa Maspion D 2 M1 54,360.00
350 Pipa Maspion D 2-1/2 M1 80,520.00
351 Pipa Maspion D 3 M1 116,800.00
352 Pipa Maspion D 4 M1 164,240.00
353 Pipa Maspion D 5 M1 268,280.00
354 Pipa Maspion D 6 M1 325,880.00
355 Pipa Maspion D 12 M1 1,370,840.00
356 Pipa PVC tipe AW Ø 1/2" Wavin M1 4,500.00
357 Pipa PVC tipe AW Ø 3/4" Wavin M1 5,750.00
358 Pipa PVC tipe AW Ø 1" Wavin M1 7,500.00
359 Pipa PVC tipe AW Ø 1 1/4" Wavin M1 10,000.00
360 Pipa PVC tipe AW Ø 1 1/2" Wavin M1 11,250.00
361 Pipa PVC tipe AW Ø 2" Wavin M1 13,750.00
362 Pipa PVC tipe AW Ø 2 1/2" Wavin M1 20,000.00
363 Pipa PVC tipe AW Ø 3" Wavin M1 36,250.00
364 Pipa PVC tipe AW Ø 4" Wavin M1 42,000.00
365 Pipa PVC tipe AW Ø 5" Wavin M1 72,125.00
366 Pipa PVC tipe AW Ø 6" Wavin M1 100,000.00
367 Pipa PVC tipe AW Ø 12" Wavin M1 500,000.00
368 Pipa PVC tipe D Ø 1 1/4" Wavin M1 27,500.00
369 Pipa PVC tipe D Ø 1 1/2" Wavin M1 28,000.00
370 Pipa PVC tipe D Ø 2" Wavin M1 41,500.00
371 Pipa PVC tipe D Ø 2 1/2" Wavin M1 48,000.00
372 Pipa PVC tipe D Ø 3" Wavin M1 60,000.00
373 Pipa PVC tipe D Ø 4" Wavin M1 90,000.00
374 Pipa PVC tipe D Ø 12" Wavin M1 1,136,000.00
375 Lem PVC Kg 10,000.00
-
Vinilon -
-
376 Pipa PVC 3/4 SNI S-8 SCJ M1 25,250.00
377 Pipa PVC 1 SNI S-8 SCJ M1 35,500.00
378 Pipa PVC 1 1/4 SNI S-8 SCJ M1 50,800.00
379 Pipa PVC 1 1/2 SNI S-8 SCJ M1 60,300.00
380 Pipa PVC 2 SNI S-8 SCJ M1 77,350.00
381 Pipa PVC 3 SNI S-8 SCJ M1 154,350.00
382 Pipa PVC 4 SNI S-8 SCJ M1 254,100.00
383 Pipa PVC 4 SNI S-8 SCJ M1 254,100.00
-
384 Pipa PVC 2 SNI S-8 RRJ M1 77,350.00
385 Pipa PVC 3 SNI S-8 RRJ M1 154,350.00
386 Pipa PVC 4 SNI S-8 RRJ M1 254,100.00
387 Pipa PVC 6 SNI S-8 RRJ M1 536,750.00
388 Pipa PVC 8 SNI S-8 RRJ M1 843,000.00
389 Pipa PVC 10 SNI S-8 RRJ M1 953,500.00
390 Pipa PVC 12 SNI S-8 RRJ M1 1,191,000.00
391 Pipa PVC 14 SNI S-8 RRJ M1 1,310,200.00
392 Pipa PVC 16 SNI S-8 RRJ M1 1,600,100.00
393 Pipa PVC 18 SNI S-8 RRJ M1 2,000,000.00
394 Pipa PVC 20 SNI S-8 RRJ M1 2,500,000.00
-
395 Pipa PVC 1/2 SNI S-10 SCJ M1 22,500.00
396 Pipa PVC 3/4 SNI S-10 SCJ M1 25,250.00
397 Pipa PVC 1 SNI S-10 SCJ M1 35,500.00
398 Pipa PVC 1 1/4 SNI S-10 SCJ M1 50,800.00
399 Pipa PVC 1 1/2 SNI S-10 SCJ M1 60,300.00
400 Pipa PVC 2 SNI S-10 SCJ M1 77,350.00
401 Pipa PVC 3 SNI S-10 SCJ M1 154,350.00
402 Pipa PVC 4 SNI S-10 SCJ M1 254,100.00
403 Pipa PVC 6 SNI S-10 SCJ M1 536,750.00
-
404 Pipa PVC 2 SNI S-10 RRJ M1 77,350.00
405 Pipa PVC 3 SNI S-10 RRJ M1 154,350.00
406 Pipa PVC 4 SNI S-10 RRJ M1 254,100.00
407 Pipa PVC 6 SNI S-10 RRJ M1 536,750.00
408 Pipa PVC 8 SNI S-10 RRJ M1 843,000.00
409 Pipa PVC 10 SNI S-10 RRJ M1 953,500.00
410 Pipa PVC 12 SNI S-10 RRJ M1 1,191.00
411 Pipa PVC 14 SNI S-10 RRJ M1 1,310,200.00
412 Pipa PVC 16 SNI S-10 RRJ M1 1,600,100.00
413 Pipa PVC 18 SNI S-10 RRJ M1 2,000,000.00
414 Pipa PVC 20 SNI S-10 RRJ M1 2,500,000.00
415 Pipa PVC 24 SNI S-10 RRJ M1 3,000,000.00
DAFTAR HARGA SATUAN UPAH TAHUN 2020

NO NAMA BARANG SATUAN HARGA DASAR


(Rp.)
1 2 3 4

1 Mandor Hari 130,000.00


2 Kepala Tukang Besi Hari 115,000.00
3 Kepala Tukang batu Hari 115,000.00
4 Kepala Tukang kayu Hari 115,000.00
5 Kepala Tukang Cat Hari 115,000.00
6 Tukang Politur Hari 100,000.00
7 Tukang Batu Hari 100,000.00
8 Tukang kayu Hari 100,000.00
9 Tukang Besi Hari 100,000.00
10 Tukang cat Hari 100,000.00
11 Tukang Listrik Hari 100,000.00
12 Tukang Pipa/ Tukang Ledeng Hari 100,000.00
13 Tukang Aspal Hari 100,000.00
14 Tukang masak Aspal Hari 100,000.00
15 Pekerja Hari 95,000.00
16 Upah Serut Profil Kayu M3 850,000.00
17 Concrete Vibrator Jam 87,500.00
18 Sewa Molen Hari 50,000.00
ANALISA
1 1 M' PENGUKURAN DAN PEMASANGAN BOUWPLANK
HARGA SATUAN
NO. URAIAN SATUAN KOEFISIEN
(Rp.)

A. TENAGA
Pekerja OH 0.10 95,000.00
Tukang kayu OH 0.10 100,000.00
Kepala tukang OH 0.01 115,000.00
Mandor OH 0.005 130,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Kayu balok 5/7 m3 0.012 2,916,500.00
Paku 2" - 3" Kg 0.02 17,850.00
Kayu Papan 3/20 m 3
0.007 2,027,600.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C)
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E)

2 1 M2 MEMBERSIHKAN LAPANGAN DAN PERALATAN


HARGA SATUAN
NO. URAIAN SATUAN KOEFISIEN
(Rp.)

A. TENAGA
Pekerja OH 0.10 95,000.00
Mandor OH 0.05 130,000.00
JUMLAH TENAGA KERJA
B. BAHAN

JUMLAH HARGA BAHAN


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C)
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E)

3 PEKERJAAN PAPAN NAMA PROYEK


HARGA SATUAN
NO. URAIAN SATUAN KOEFISIEN
(Rp.)
A BAHAN
Kayu Usuk Meranti 4/6 m3 0.0250 4,500,000.00

Paku kg 0.3500 17,850.00


Banner Outdoor Vinyl m2 2.4000 200,000.00
JUMLAH HARGA BAHAN
Jumlah
Overhead & Profit 0 %xD
Harga Satuan Pekerjaan (D+E)

PEKERJAAN TANAH
4 1 M3 GALIAN TANAH BIASA DALAM 1 METER
KOEFISIEN HARGA SATUAN
NO. URAIAN SATUAN
(Rp.)

A. TENAGA
Pekerja OH 0.750 95,000.00
Mandor OH 0.025 130,000.00
JUMLAH TENAGA KERJA
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C)
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E)

5 1 M3 GALIAN TANAH MENERUS


KOEFISIEN HARGA SATUAN
NO. URAIAN SATUAN
(Rp.)
A. TENAGA
Pekerja OH 0.750 95,000.00
Mandor OH 0.025 130,000.00
JUMLAH TENAGA KERJA
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C)
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E)

6 1 M3 PENGURUGAN KEMBALI GALIAN TANAH


HARGA SATUAN
NO. URAIAN SATUAN KOEFISIEN
(Rp.)

A. TENAGA
Pekerja OH 0.500 95,000.00
Mandor OH 0.050 130,000.00
JUMLAH TENAGA KERJA
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C)
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E)

7 1 M3 URUGAN SIRTU PADAT Untuk Peninggian Lantai Bangunan


KOEFISIEN HARGA SATUAN
NO. URAIAN SATUAN
(Rp.)

A. TENAGA
Pekerja OH 0.2500 95,000.00
Mandor OH 0.0250 130,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Sirtu m3 1.200 127,200.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C)
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E)

8 1 M3 PEMADATAN TANAH ( Per 20 Cm )


HARGA SATUAN
NO. URAIAN SATUAN KOEFISIEN
(Rp.)

A. TENAGA
Pekerja OH 0.500 95,000.00
Mandor OH 0.050 130,000.00
JUMLAH TENAGA KERJA
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C)
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E)

PEKERJAAN PONDASI
9 1 M2 PASANG BEKISTING UNTUK PONDASI
NO. URAIAN SATUAN KOEFISIEN HARGA SATUAN
(Rp.)

A. TENAGA
Pekerja OH 0.520 95,000.00
Tukang Kayu OH 0.260 100,000.00
Kepala Tukang OH 0.026 115,000.00
Mandor OH 0.026 130,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Kayu Kelas III m3 0.040 2,027,600.00
Paku Biasa 5 - 10 cm kg 0.300 17,850.00
Minyak Bekisting ltr 0.100 5,200.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C)
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E)

10 PEMBESIAN 10 KG DENGAN BESI POLOS ATAU BESI ULIR


KOEFISIEN HARGA SATUAN
NO. URAIAN SATUAN
(Rp.)

A. TENAGA
Pekerja OH 0.070 95,000.00
Tukang Besi OH 0.070 100,000.00
Kepala Tukang OH 0.007 115,000.00
Mandor OH 0.004 130,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Besi Beton (Polos/ Ulir) kg 10.500 9,350.00
Kawat Beton kg 0.150 20,500.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C)
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan Pekerjaan untuk 1 Kg

11 MEMBUAT 1 M³ BETON MUTU f'C= 26,4 Mpa (K300), Slump (12 ± 2)cm, w/c =0,52
KOEFISIEN HARGA SATUAN
NO. URAIAN SATUAN
(Rp.)
A. TENAGA
Pekerja OH 1.650 95,000.00
Tukang Batu OH 0.275 100,000.00
Kepala Tukang OH 0.028 115,000.00
Mandor OH 0.083 130,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Semen Portland (Gersik) kg 413.000 1,200.00
Pasir Beton kg 681 138.07
Koral Beton kg 1,021 142.66
Air liter 215 16.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C)
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E)

12 1 M3 BATU BELAH CAMP. 1 SP : 5 PP


KOEFISIEN HARGA SATUAN
NO. URAIAN SATUAN
(Rp.)

A. TENAGA
Pekerja OH 1.500 95,000.00
Tukang Batu OH 0.750 100,000.00
Kepala Tukang OH 0.075 115,000.00
Mandor OH 0.075 130,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Batu Belah m3 1.200 133.25
Semen portland (Gersik) kg 136.000 1,200.00
Pasir Pasang m3 0.544 124.83
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C)
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E)

PEKERJAAN DINDING

13 1 M2 PASANGAN DINDING BATAKO / HOLLOWBLOCK (HB. 10), campuran spesi 1 psp : 4 pp


KOEFISIEN HARGA SATUAN
NO. URAIAN SATUAN
(Rp.)

A. TENAGA
Pekerja OH 0.300 95,000.00
Tukang Batu OH 0.100 100,000.00
Kepala Tukang OH 0.010 115,000.00
Mandor OH 0.015 130,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Batako bh 12.5000 3,100.00
Semen Portland (Gersik) Kg 15.160 1,200.00
Pasir Pasang m3 0.364 124.83
Besi Beton 8 mm kg 0.280 6,700.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C)
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E)

14 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 15 MM


KOEFISIEN HARGA SATUAN
NO. URAIAN SATUAN
(Rp.)

A. TENAGA
Pekerja OH 0.300 95,000.00
Tukang Batu OH 0.150 100,000.00
Kepala Tukang OH 0.015 115,000.00
Mandor OH 0.015 130,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Semen Portland (Gersik) kg 6.240 1,200.00
Pasir Pasang m3 0.024 124.83
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C)
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E)

15 1 M2 PEKERJAAN ACIAN
KOEFISIEN HARGA SATUAN
NO. URAIAN SATUAN
(Rp.)

A. TENAGA
Pekerja OH 0.200 95,000.00
Tukang Batu OH 0.100 100,000.00
Kepala Tukang OH 0.01 115,000.00
Mandor OH 0.01 130,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Semen Portland (Gersik) kg 3.25 1,200.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C)
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E)

16 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (11 X 11 CM)


KOEFISIEN HARGA SATUAN
NO. URAIAN SATUAN
(Rp.)

A. TENAGA
Pekerja OH 0.180 95,000.00
Tukang Batu OH 0.020 100,000.00
Tukang Kayu OH 0.020 100,000.00
Tukang Besi OH 0.020 100,000.00
Kepala Tukang OH 0.006 115,000.00
Mandor OH 0.009 130,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Kayu Kelas III m3 0.002 2,027,600.00
Paku Biasa 5cm - 12cm kg 0.010 17,850.00
Minyak bekisting Liter
Besi Beton polos kg 3.000 6,700.00
Kawat Beton kg 0.450 20,500.00
Semen Portland ( Gersik) kg 4.000 1,200.00
Pasir Beton m3 0.006 138.07
Koral Beton m3 0.009 142.66
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C)
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E)

17 1 M2 PASANG DINDING KERAMIK 20 CM X 20 CM


KOEFISIEN HARGA SATUAN
NO. URAIAN SATUAN
(Rp.)

A. TENAGA
Pekerja OH 0.90 95,000.00
Tukang Batu OH 0.45 100,000.00
Kepala Tukang OH 0.045 115,000.00
Mandor OH 0.045 130,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Keramik dinding buah 26.50 2,257.74
Semen Portland Kg 9.30 1,200.00
Pasir pasang M3 0.018 124.83
Semen warna Kg 1.94 13,430.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C)
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E)

PEKERJAAN PENGECATAN WATERPROOFING

18 1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
KOEFISIEN HARGA SATUAN
NO. URAIAN SATUAN
(Rp.)

A. TENAGA
Pekerja OH 0.0200 95,000.00
Tukang cat OH 0.0630 100,000.00
Kepala Tukang OH 0.0063 115,000.00
Mandor OH 0.0025 130,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Plamir kg 0.1000 14,720.00
Cat dasar kg 0.1000 28,370.00
Cat Penutup 2x kg 0.2600 29,350.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C)
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E)

19 1 M2 WATERPROOFING
KOEFISIEN HARGA SATUAN
NO. URAIAN SATUAN
(Rp.)

A. TENAGA
Pekerja OH 0.0150 95,000.00
Tukang cat OH 0.1600 100,000.00
Kepala Tukang OH 0.0140 115,000.00
Mandor OH 0.0050 130,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Waterprofing dumplix 3 kg 0.4500 47,120.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C)
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E)

20 1 M2 PEKERJAAN PENGECATAN LANGIT -LANGIT 2 LAPIS DENGAN CAT TEMBOKS TERMASUK PLAMIR
KOEFISIEN HARGA SATUAN
NO. URAIAN SATUAN
(Rp.)

A. TENAGA
Pekerja OH 0.0800 95,000.00
Tukang cat OH 0.0600 100,000.00
Kepala Tukang OH 0.0060 115,000.00
Mandor OH 0.0040 130,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Plamir Tembok kg 0.1000 14,720.00
Cat Tembok Vinilex Kg 0.2400 29,350.00
Amplas Lbr 0.5000 3,560.00

JUMLAH HARGA BAHAN


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C)
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E)
21 1 M2 PEKERJAAN PELAPISAN BIDANG KAYU DENGAN VERNIS 2 LAPIS
KOEFISIEN HARGA SATUAN
NO. URAIAN SATUAN
(Rp.)

A. TENAGA
Tukang cat OH 0.1000 100,000.00
Kepala Tukang OH 0.0100 115,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Vernis Ltr 0.3000 72,000.00
Amplas Lbr 0.5000 3,560.00
Kuas Bh 0.0200 5,330.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C)
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E)

SANITAIR

22 MEMASANG 1 BUAH KLOSET DUDUK/MONOBLOK


KOEFISIEN HARGA SATUAN
NO. URAIAN SATUAN
(Rp.)

A. TENAGA
Pekerja OH 3.3000 95,000.00
Tukang Batu OH 1.1000 100,000.00
Kepala Tukang OH 0.0010 115,000.00
Mandor OH 0.1600 130,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Kloset duduk/ monoblok bh 1.0000 2,122,490.00
Perlengkapan 6% x harga kloset 127,349.40
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E)

23 MEMASANG 1 BUAH WASHTAFEL KIA


KOEFISIEN HARGA SATUAN
NO. URAIAN SATUAN
(Rp.)

A. TENAGA
Pekerja OH 1.2000 95,000.00
Tukang Batu OH 1.4500 100,000.00
Kepala Tukang OH 0.1500 115,000.00
Mandor OH 0.1000 130,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Wastafel bh 1.0000 522,450.00
Perlengkapan 12% x harga wast 62,694.00
Semen kg 6.0000 1,200.00
Pasir Pasang m3 0.0100 124.83
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C)
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E)

24 MEMASANG 1 BUAH URINOIR


KOEFISIEN HARGA SATUAN
NO. URAIAN SATUAN
(Rp.)

A. TENAGA
Pekerja OH 1.0000 95,000.00
Tukang Batu OH 1.0000 100,000.00
Kepala Tukang OH 0.1000 115,000.00
Mandor OH 0.1000 130,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Urinoir bh 1.0000 2,431,630.00
Perlengkapan 30% x harga Urinoir 1,200.00
Semen kg 6.0000 124.83
Pasir Pasang m3 0.0100 124.83
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C)
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E)

25 MEMASANG 1 BUAH KRAN f 0,75" ATAU 0,5"


KOEFISIEN HARGA SATUAN
NO. URAIAN SATUAN
(Rp.)

A. TENAGA
Tukang Pipa OH 0.1000 100,000.00
OH 0.0100 100,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Kran air bh 1.0000 26,890.00
Seal tape bh 0.0250 4,540.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C)
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E)

26 MEMASANG 1 BUAH FLOOR DRAIN


HARGA SATUAN
NO. URAIAN SATUAN KOEFISIEN
(Rp.)

A. TENAGA
Pekerja OH 0.080000 95,000.00
Tukang Pipa/ Tukang Ledeng OH 0.300000 100,000.00
Kepala Tukang OH 0.030000 115,000.00
Mandor OH 0.003000 130,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Floor Drain " TOTO TypeTx 1 Bv 1 " Square bh 1.0000 155,480.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C)
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E)
JUMLAH HARGA
(Rp.)

9,500.00
10,000.00
1,150.00
650.00
21,300.00

34,998.00
357.00
14,193.20
49,548.20

70,848.20
-
70,848.20

JUMLAH HARGA
(Rp.)

9,500.00
6,500.00
16,000.00

16,000.00
-
16,000.00

JUMLAH HARGA
(Rp.)

112,500.00

6,247.50
480,000.00
598,747.50
598,747.50
-
598,747.50

JUMLAH HARGA
(Rp.)

71,250.00
3,250.00
74,500.00

74,500.00
-
74,500.00

JUMLAH HARGA
(Rp.)
71,250.00
3,250.00
74,500.00

74,500.00
-
74,500.00

JUMLAH HARGA
(Rp.)

47,500.00
6,500.00
54,000.00

54,000.00
-
54,000.00

JUMLAH HARGA
(Rp.)

23,750.00
3,250.00
27,000.00

152,640.00
152,640.00

179,640.00
-
179,640.00

JUMLAH HARGA
(Rp.)

47,500.00
6,500.00
54,000.00

54,000.00
-
54,000.00

JUMLAH HARGA
(Rp.)

49,400.00
26,000.00
2,990.00
3,380.00
81,770.00

81,104.00
5,355.00
520.00
86,979.00

168,749.00

168,749.00

JUMLAH HARGA
(Rp.)

6,650.00
7,000.00
805.00
520.00
14,975.00

98,175.00
3,075.00
101,250.00

116,225.00

116,225.00
11,622.50

JUMLAH HARGA
(Rp.)
156,750.00
27,500.00
3,220.00
10,790.00
198,260.00

495,600.00
94,026.64
145,655.10
3,440.00
738,721.75

936,981.75

936,981.75

JUMLAH HARGA
(Rp.)

142,500.00
75,000.00
8,625.00
9,750.00
235,875.00

159.90
163,200.00
67.91
163,427.81

399,302.81
-
399,302.81

JUMLAH HARGA
(Rp.)

28,500.00
10,000.00
1,150.00
1,950.00
41,600.00

38,750.00
18,192.00
45.44
1,876.00
58,863.44

100,463.44

100,463.44

JUMLAH HARGA
(Rp.)

28,500.00
15,000.00
1,725.00
1,950.00
47,175.00
7,488.00
3.00
7,491.00

54,666.00

54,666.00

JUMLAH HARGA
(Rp.)

19,000.00
10,000.00
1,150.00
1,300.00
31,450.00

3,900.00
3,900.00

35,350.00

35,350.00

JUMLAH HARGA
(Rp.)

17,100.00
2,000.00
2,000.00
2,000.00
690.00
1,170.00
24,960.00

4,055.20
178.50

20,100.00
9,225.00
4,800.00
0.83
1.28
38,360.81

63,320.81

63,320.81

JUMLAH HARGA
(Rp.)

85,500.00
45,000.00
5,175.00
5,850.00
141,525.00

59,830.00
11,160.00
2.25
26,054.20
70,990.00
212,515.00

212,515.00

JUMLAH HARGA
(Rp.)

1,900.00
6,300.00
724.50
325.00
9,249.50

1,472.00
2,837.00
7,631.00
11,940.00

21,189.50

21,189.50

JUMLAH HARGA
(Rp.)

1,425.00
16,000.00
1,610.00
650.00
19,685.00

21,204.00
21,204.00

40,889.00

40,889.00

SUK PLAMIR
JUMLAH HARGA
(Rp.)

7,600.00
6,000.00
690.00
520.00
14,810.00

1,472.00
7,044.00
1,780.00

10,296.00

25,106.00

25,106.00
JUMLAH HARGA
(Rp.)

10,000.00
1,150.00
11,150.00

21,600.00
1,780.00
106.60
23,486.60

34,636.60

34,636.60

JUMLAH HARGA
(Rp.)

313,500.00
110,000.00
115.00
20,800.00
444,415.00

2,122,490.00
127,349.40
2,249,839.40
2,694,254.40

2,694,254.40

JUMLAH HARGA
(Rp.)

114,000.00
145,000.00
17,250.00
13,000.00
289,250.00

522,450.00
62,694.00
7,200.00
1.25
592,345.25

881,595.25

881,595.25

JUMLAH HARGA
(Rp.)

95,000.00
100,000.00
11,500.00
13,000.00
219,500.00
2,431,630.00
1,200.00
749.01
1.25
2,433,580.26

2,653,080.26

2,653,080.26

JUMLAH HARGA
(Rp.)

10,000.00
1,000.00
11,000.00

26,890.00
113.50
27,003.50

38,003.50

38,003.50

JUMLAH HARGA
(Rp.)
7,600.00
30,000.00
3,450.00
390.00
41,440.00

155,480.00
155,480.00

196,920.00

196,920.00
LAMPIRAN PERMEN PUPR NO 28 TAHUN 2016
TABEL A.2.a – Berat isi dan penyerapan agregat kasar dan halus
No. Nama Bahan Berat Isi Padat (BiP) Berat Isi Lepas (BiL) Penyerapan
(T/m³) (T/m³)
Min Maks Min Maks
1 Agregat kasar 1.36 1.45 1.236 1.283 1,94 - 2,02
1.32 1.38 1.2 1.221 2,50 - 2,65
2 Agregat halus 1.38 1.54 1.255 1.363 1,65 - 1,93

Batu Kali/Batu Belah M3 170,960.00


kg 133.25
Kerikil Beton M3 192,590.00
kg 142.66
Pasir Beton M3 193,300.00
kg 138.07
Pasir Pasang M3 170,150.00
kg 124.83
Pasir Urug M3 114,500.00
kg 84.01

Anda mungkin juga menyukai