TERBILANG " DUA MILYAR SERATUS TUJUH PULUH SEMBILAN JUTA LIMA RATUS
ENAM PULUH DELAPAN RIBU RUPIAH "
Menyetujui :
Kepala Dinas Kesehatan
Kabupaten Sumenep
GULUK-GULUK
MLAH HARGA
7,226,695.00
37,203,608.75
126,335,854.21
138,851,074.42
82,027,718.95
14,228,889.95
11,761,835.69
200,282,502.63
98,258,700.80
51,072,462.74
89,016,710.68
856,266,053.81
8,976,695.00
37,075,437.92
116,470,187.19
152,036,607.07
85,921,155.53
15,425,557.40
13,931,839.09
205,237,880.53
93,273,203.88
47,490,064.89
103,330,501.02
14,414,347.69
893,583,477.20
79,400,582.20
109,504,576.25
42,671,000.00
-
231,576,158.45
1,981,425,689.46
198,142,568.95
………….. 2018
Oleh ,
RYA UTAMA
erencana
hyudi
Utama
III. SEMEN
1 M037 Portland Cement (PC) kg
2 M039 Portland Cement (PC) Warna kg
IV KAYU
Kayu Meranti
1 M061 Usuk : 5/7 m3
2 M063 Papan (2x20) cm m3
3 M064 Papan (3x20) cm m3
Kayu Lain-lain
1 M084 Balok Kayu Kelas III m3
2 M085 Papan Kayu kelas III m3
3 M089 Dolken Kayu Ø 8 cm btg
VI ATAP GENTENG
1 M149 Genteng Marando ex Ambulu bh
2 M156 Genteng Bubungan Marandoi ex Ambulu bh
X ALAT-ALAT PENGGANTUNG
1 M254 Kunci 2 x putar bh
2 M257 Engsel pintu nylon arch asli bh
3 M258 Engsel jendela nylon arch asli bh
4 M259 Hak Angin bh
5 M262 Grendel Pintu bh
6 M263 Grendel Jendela bh
7 M266 Door Holder bh
XI. PERLENGKAPAN LANTAI
1 M318 Tegel Keramik 40 x 40 (warna gelap) bh
2 M322 Tegel Wavel Warna 20 x 20 bh
46 M327 Keramik Dinding 20 x 25 cm bh
XII PERPIPAAN
1 M334 Pipa PVC tipe AW Ø 1/2 " m1
2 M340 Pipa PVC tipe AW Ø 3 " m1
3 M341 Pipa PVC tipe AW Ø 4 " m1
4 M379 Pipa Galvanis Ø 1.5 ", tebal 2 mm m1
XV INSTALASI LISTRIK
1 M437 Kabel NYA 2.5 mm m1
2 M439 Stop Kontak (merk setara Brocco) bh
3 M440 Saklar Broco Tunggal (merk setara Brocco) bh
4 M440.a Saklar Broco Ganda (merk setara Brocco) bh
5 M441 Las doof bh
6 M442 Isolator m1
7 M443 T dos PVC bh
8 M444 Pipa PVC 5/8" Ljr
9 M445 Fitting E.27 bh
10 M447 Zekering Kast Lokal 2 Group Unit
11 M451 Lampu PLC (merk setara Philip) 5 Watt bh
12 M453 Lampu PLC (merk setara Philip) 14 Watt bh
HARGA KET.
172,000.00
127,500.00
127,500.00
11,460.00
83,460.00
172,000.00
-
240,500.00
348,000.00
348,000.00
900.00
196,100.00
-
-
1,925.00
3,000.00
-
-
-
6,346,400.00
9,231,200.00
9,231,200.00
-
1,241,100.00
4,176,130.00
28,800.00
-
17,800.00
14,000.00
19,460.00
111,900.00
299,000.00
43,250.00
18,600.00
17,300.00
400.00
20,540.00
33,400.00
11,670.00
-
3,000.00
3,400.00
-
26,100.00
37,300.00
91,600.00
21,160.00
93,400.00
157,000.00
747,700.00
26,100.00
418,800.00
628,800.00
38,000.00
38,000.00
77,950.00
164,500.00
52,300.00
37,300.00
18,600.00
104,700.00
22,500.00
139,150.00
12,500.00
2,168.00
3,545.00
8,640.00
121,725.00
177,850.00
114,025.00
5,100.00
41,100.00
22,500.00
37,300.00
52,300.00
45,000.00
100,900.00
44,800.00
61,240.00
100,900.00
44,800.00
88,600.00
41,100.00
14,400.00
66,810.00
3,619,310.00
1,000,000.00
8,000.00
18,000.00
16,500.00
21,000.00
750.00
860.00
1,400.00
7,780.00
43,300.00
105,740.00
33,000.00
44,800.00
19,460.00
45,600.00
20,600.00
5,800.00
77,700.00
40.00
237,500.00
11,333.33
Rencana Anggaran Biaya
PEKERJAAN : PEMBANGUNAN RAWAT INAP PUSKESMAS GULUK-GUL
Kode
No Pekerjaan Volume Sat
Analisa
A PEKERJAAN INSTALASI GAWAT DARURAT
I PEKERJAAN PERSIAPAN
1 A. 2.2.1.4. Pengukuran dan pemasangan bowplank 62.00 m1
2 - Bongkar bangunan lama 1.00 Ls
3 - Pasang papan nama proyek 1.00 bh
4 - Pasang papan prasasti 1.00 bh
II PEKERJAAN TANAH
1 A.2.3.1.1. Galian tanah 152.10 m³
2 A.2.3.1.9. Urugan tanah kembali 50.70 m³
3 A.2.3.1.11. Urugan pasir bawah pondasi t= 10 cm 11.70 m³
4 A.2.3.1.11. Urugan pasir bawah lantai t=10 cm 26.90 m³
5 A.2.3.1.14. Urugan pudel kuning peninggian level lantai 35.84 m³
IV PEKERJAAN BETON
1 A.4.1.1.1 Lantai kerja pondasi t= 7 cm, mutu K-100 0.36 m³
2 A.4.1.1.1 Rabatan lantai t= 7 cm, mutu K-100 12.54 m³
Kode
No Pekerjaan Volume Sat
Analisa
12 Pelat beton kanopi elev. +3.00 t=10 cm, mutu K-225
A.4.1.1.7. - Beton mutu K-225 0.88 m³
A.4.1.1.24-a - Bekisting pelat lantai 8.79 m2
A.4.1.1.17.a - Pembesian per kg 70.32 kg
VI PEKERJAAN LANGIT-LANGIT
1 A.4.5.1.7. Pasang langit-langit gypsum board, ( 120 X 240 X 9 ) 167.20 m2
2 A.4.5.1.7.a Pasang langit-langit GRC board 4mm, ( 120 X 240 X 9 61.30 m2
3 A.4.5.1.9.-a List langit-langit gypsum 10 cm 164.00 m1
IX PEKERJAAN KERAMIK
1 A.4.4.3.13.a Pasang lantai Homogeneus Tile (60x60) 173.20 m2
2 A.4.4.3.13.b Pasang lantai keramik ukuran 40 x 40 cm anti slip (sel 23.00 m2
3 A.4.4.3.36. Pasang lantai keramik ukuran 20 x 20 cm ani slip (toile 6.00 m2
4 A.4.4.3.54. Pasang dinding keramik ukuran 20 x 20 cm (toilet) 28.00 m2
5 A.4.4.3.58.a Pasang hospital plint 164.00 m
6 A.4.4.3.13.b Pasang lantai keramik ukuran 40 x 40 cm anti slip (dro 66.80 m2
7 A.4.4.3.58. Pasang batu alam paras Jogja 12.80 m2
8 Pasang keramik ukuran 20 x 20 cm (plat dapur) 18.00 m2
X PEKERJAAN PENGECATAN
1 A.4.7.1.10. Pengecatan tembok interior 585.86 m2
2 A.4.7.1.10.a Pengecatan tembok eksterior 137.87 m2
3 A.4.7.1.10. Pengecatan plafon 167.20 m2
4 A.4.7.1.16. Pengecatan permukaan baja 55.55 m2
5 A.4.7.1.4. 1 Pengecatan Kalsiplank 2/30 18.24 m2
Kode
No Pekerjaan Volume Sat
Analisa
XI PEKERJAAN PINTU DAN KACA
1 Pasang Pintu PK 1.00 unit
2 Pasang Pintu P2A 1.00 unit
3 Pasang Pintu P2B 3.00 unit
4 Pasang Pintu P1A 2.00 unit
5 Pasang Pintu P1B 1.00 unit
6 Pasang Pintu PG 1.00 unit
7 Pasang Pintu PTA 1.00 unit
8 Pasang Pintu PTB - unit
9 Pasang Pintu PTC 2.00 unit
10 Pasang Jendela JG - unit
11 Pasang Jendela J1 - unit
Kode
No Pekerjaan Volume Sat
Analisa
B PEKERJAAN RAWAT INAP
I PEKERJAAN PERSIAPAN
1 A. 2.2.1.4. Pengukuran dan pemasangan bowplank 62.00 m1
2 - Bongkar bangunan lama 1.00 Ls
3 - Pembuatan rumah pompa 1.00 Ls
II PEKERJAAN TANAH
1 A.2.3.1.1. Galian tanah 144.30 m³
2 A.2.3.1.9. Urugan tanah kembali 48.10 m³
3 A.2.3.1.11. Urugan pasir bawah pondasi t= 10 cm 11.10 m³
4 A.2.3.1.11. Urugan pasir bawah lantai t=10 cm 27.61 m³
5 A.2.3.1.14. Urugan pudel kuning peninggian level lantai 38.64 m³
IV PEKERJAAN BETON
1 A.4.1.1.1 Lantai kerja pondasi t= 7 cm, mutu K-100 0.36 m³
Kode
No Pekerjaan Volume Sat
Analisa
8 Balok B1 15x25 cm, mutu K-225
A.4.1.1.7. - Beton mutu K-225 2.03 m³
A.4.1.1.23-a - Bekisting balok 35.10 m2
A.4.1.1.17.a - Pembesian per kg 286.85 kg
VI PEKERJAAN LANGIT-LANGIT
1 A.4.5.1.7. Pasang langit-langit gypsum board, ( 120 X 240 X 9 ) 185.28 m2
2 A.4.5.1.7.a Pasang langit-langit GRC board 4mm, ( 120 X 240 X 9 70.43 m2
3 A.4.5.1.9.-a List langit-langit gypsum 10 cm 164.00 m1
IX PEKERJAAN KERAMIK
1 A.4.4.3.13.a Pasang lantai Homogeneus Tile (60x60) 200.40 m2
2 A.4.4.3.13.b Pasang lantai keramik ukuran 40 x 40 cm anti slip (sel 69.73 m2
3 A.4.4.3.36. Pasang lantai keramik ukuran 20 x 20 cm ani slip (toile 6.00 m2
4 A.4.4.3.54. Pasang dinding keramik ukuran 20 x 20 cm (toilet) 28.00 m2
5 A.4.4.3.58.a Pasang hospital plint 164.00 m
X PEKERJAAN PENGECATAN
1 A.4.7.1.10. Pengecatan tembok interior 581.02 m2
2 A.4.7.1.10.a Pengecatan tembok eksterior 72.93 m2
Kode
No Pekerjaan Volume Sat
Analisa
3 A.4.7.1.10. Pengecatan plafon 185.28 m2
4 A.4.7.1.16. Pengecatan permukaan baja 56.20 m2
5 A.4.7.1.4. 1 Pengecatan Kalsiplank 2/30 18.24 m2
Rp 68,172.50 Rp 4,226,695.00
Rp 1,750,000.00 Rp 1,750,000.00
Rp 500,000.00 Rp 500,000.00
Rp 750,000.00 Rp 750,000.00
Rp 7,226,695.00
Rp 73,562.50 Rp 11,188,856.25
Rp 53,625.00 Rp 2,718,787.50
Rp 425,425.00 Rp 4,977,472.50
Rp 425,425.00 Rp 11,443,932.50
Rp 191,812.50 Rp 6,874,560.00
Rp 37,203,608.75
Rp 794,805.00 Rp 40,916,561.40
Rp 505,120.00 Rp 5,909,904.00
Rp 118,140.00 Rp 42,750,435.75
Rp 37,152.50 Rp 26,888,193.06
Rp 60,005.00 Rp 9,120,760.00
Rp 250,000.00 Rp 750,000.00
Rp 126,335,854.21
Rp 1,146,277.00 Rp 410,825.68
Rp 1,303,767.03 Rp 16,354,453.59
Rp 1,450,702.84 Rp 2,228,279.57
Rp 11,740.50 Rp 2,074,743.59
Rp 1,450,702.84 Rp 2,279,675.90
Rp 11,740.50 Rp 4,005,391.66
Rp 1,450,702.84 Rp 2,937,673.26
Rp 372,064.00 Rp 10,045,728.00
Rp 11,740.50 Rp 3,215,582.06
Rp 119,233.95 Rp 7,511,738.85
Rp 94,814.50 Rp 9,860,708.00
Rp 1,450,702.84 Rp 2,937,673.26
Rp 504,707.28 Rp 17,715,225.53
Rp 11,740.50 Rp 3,367,738.94
Rp 119,233.95 Rp 7,511,738.85
Rp 119,233.95 Rp 3,292,049.36
Rp 1,450,702.84 Rp 1,740,843.41
Rp 627,331.65 Rp 7,527,979.80
Rp 11,740.50 Rp 1,127,088.00
Rp 1,450,702.84 Rp 1,275,167.80
Rp 627,331.65 Rp 5,514,245.20
Rp 11,740.50 Rp 825,591.96
Rp 1,450,702.84 Rp 979,224.42
Rp 627,331.65 Rp 4,234,488.64
Rp 11,740.50 Rp 633,987.00
Rp 138,851,074.42
Rp 225,525.00 Rp 65,624,287.41
Rp 237,820.00 Rp 11,257,461.28
Rp 123,768.15 Rp 5,145,970.26
Rp 82,027,718.95
Rp 43,323.50 Rp 7,243,689.20
Rp 45,325.50 Rp 2,778,453.15
Rp 25,650.90 Rp 4,206,747.60
Rp 14,228,889.95
Rp 1,271,057.39 Rp 2,542,114.78
Rp 1,005,790.19 Rp 8,046,321.54
Rp 498,836.25 Rp 498,836.25
Rp 55,137.50 Rp 110,275.00
Rp 235,120.05 Rp 564,288.12
Rp 24,747.25 Rp 43,097,603.67
Rp 455,758.55 Rp 18,949,300.99
Rp 24,747.25 Rp 64,887,289.50
Rp 172,466.25 Rp 50,185,011.68
Rp 27,481.30 Rp 109,248.90
Rp 24,863.85 Rp 439,157.75
Rp 18,126.35 Rp 100,294.08
Rp 18,126.35 Rp 305,809.80
Rp 1,358.61 Rp 6,439,967.38
Rp 5,307.28 Rp 585,185.03
Rp 296,931.80 Rp 3,563,181.60
Rp 49,570.31 Rp 8,288,156.25
Rp 54,807.50 Rp 3,332,296.00
Rp 200,282,502.63
Rp 289,440.00 Rp 50,131,008.00
Rp 215,050.00 Rp 4,946,150.00
Rp 204,682.50 Rp 1,228,095.00
Rp 204,682.50 Rp 5,731,110.00
Rp 81,191.00 Rp 13,315,324.00
Rp 215,050.00 Rp 14,365,340.00
Rp 379,483.50 Rp 4,857,388.80
Rp 204,682.50 Rp 3,684,285.00
Rp 98,258,700.80
Rp 54,230.66 Rp 31,771,357.54
Rp 59,201.34 Rp 8,162,029.54
Rp 27,744.20 Rp 4,638,830.24
Rp 35,841.85 Rp 1,991,182.43
Rp 247,207.40 Rp 4,509,062.98
Rp 51,072,462.74
### Rp 19,166,728.11
Rp 5,393,174.74 Rp 5,393,174.74
Rp 4,349,088.17 Rp 13,047,264.50
Rp 3,263,807.57 Rp 6,527,615.13
Rp 3,025,627.58 Rp 3,025,627.58
Rp 4,268,202.58 Rp 4,268,202.58
Rp 1,410,980.26 Rp 1,410,980.26
Rp 1,669,123.53 Rp -
Rp 1,443,870.74 Rp 2,887,741.48
Rp 2,063,190.92 Rp -
Rp 1,355,697.00 Rp -
Rp 89,016,710.68
nstruksi Rp 856,266,053.81
Rp 68,172.50 Rp 4,226,695.00
Rp 1,750,000.00 Rp 1,750,000.00
Rp 3,000,000.00 Rp 3,000,000.00
Rp 8,976,695.00
Rp 73,562.50 Rp 10,615,068.75
Rp 53,625.00 Rp 2,579,362.50
Rp 425,425.00 Rp 4,722,217.50
Rp 425,425.00 Rp 11,747,154.17
Rp 191,812.50 Rp 7,411,635.00
Rp 37,075,437.92
Rp 794,805.00 Rp 38,818,276.20
Rp 505,120.00 Rp 5,606,832.00
Rp 118,140.00 Rp 38,628,590.22
Rp 37,152.50 Rp 24,295,728.77
Rp 60,005.00 Rp 9,120,760.00
Rp 116,470,187.19
Rp 1,146,277.00 Rp 410,825.68
Rp 1,303,767.03 Rp 18,836,826.01
Rp 1,505,909.46 Rp 2,313,076.93
Rp 11,740.50 Rp 2,074,743.59
Rp 1,450,702.84 Rp 2,279,675.90
Rp 11,740.50 Rp 4,005,391.66
Rp 1,450,702.84 Rp 2,937,673.26
Rp 372,064.00 Rp 10,045,728.00
Rp 11,740.50 Rp 3,215,582.06
Rp 119,233.95 Rp 6,796,335.15
Rp 94,814.50 Rp 9,860,708.00
Rp 1,450,702.84 Rp 2,937,673.26
Rp 504,707.28 Rp 17,715,225.53
Rp 11,740.50 Rp 3,367,738.94
Rp 119,233.95 Rp 6,796,335.15
Rp 119,233.95 Rp 3,268,202.57
Rp 1,450,702.84 Rp 3,481,686.83
Rp 627,331.65 Rp 15,055,959.60
Rp 11,740.50 Rp 2,254,176.00
Rp 1,450,702.84 Rp 1,697,322.33
Rp 627,331.65 Rp 7,339,780.31
Rp 11,740.50 Rp 1,098,910.80
Rp 152,036,607.07
Rp 225,525.00 Rp 65,624,287.41
Rp 237,820.00 Rp 11,257,461.28
Rp 123,768.15 Rp 9,039,406.84
Rp 85,921,155.53
Rp 43,323.50 Rp 8,026,761.46
Rp 45,325.50 Rp 3,192,048.34
Rp 25,650.90 Rp 4,206,747.60
Rp 15,425,557.40
Rp 1,271,057.39 Rp 6,355,286.96
Rp 1,005,790.19 Rp 3,017,370.58
Rp 498,836.25 Rp 498,836.25
Rp 55,137.50 Rp 275,687.50
Rp 235,120.05 Rp 1,410,720.30
Rp 368,156.25 Rp 1,104,468.75
Rp 423,156.25 Rp 1,269,468.75
Rp 13,931,839.09
Rp 24,747.25 Rp 44,350,804.41
Rp 205,237,880.53
Rp 289,440.00 Rp 58,003,776.00
Rp 215,050.00 Rp 14,994,898.88
Rp 204,682.50 Rp 1,228,095.00
Rp 204,682.50 Rp 5,731,110.00
Rp 81,191.00 Rp 13,315,324.00
Rp 93,273,203.88
Rp 54,230.66 Rp 31,508,989.61
Rp 59,201.34 Rp 4,317,435.32
Rp 27,744.20 Rp 5,140,306.66
Rp 35,841.85 Rp 2,014,270.32
Rp 247,207.40 Rp 4,509,062.98
Rp 47,490,064.89
### Rp -
Rp 5,393,174.74 Rp 10,786,349.48
Rp 4,349,088.17 Rp 13,047,264.50
Rp 3,263,807.57 Rp 13,055,230.26
Rp 3,025,627.58 Rp -
Rp 4,268,202.58 Rp 8,536,405.16
Rp 1,410,980.26 Rp -
Rp 1,669,123.53 Rp 8,345,617.64
Rp 1,443,870.74 Rp -
Rp 2,063,190.92 Rp 2,063,190.92
Rp 1,355,697.00 Rp 2,711,394.01
Rp 2,380,279.60 Rp 14,281,677.57
Rp 3,629,165.50 Rp 18,145,827.49
Rp 603,535.03 Rp 4,224,745.22
Rp 1,351,305.70 Rp -
Rp 592,754.24 Rp 592,754.24
Rp 804,280.79 Rp 5,629,965.56
Rp 764,720.39 Rp 764,720.39
Rp 381,786.19 Rp 1,145,358.58
Rp 73,562.50 Rp 1,377,090.00
Rp 425,425.00 Rp 680,680.00
Rp 117,925.50 Rp 1,103,782.68
Rp 68,105.40 Rp 637,466.54
Rp 1,303,767.03 Rp 1,460,219.07
Rp 1,303,767.03 Rp 1,668,821.79
Rp 364,576.58 Rp 5,833,225.20
Rp 12,914.55 Rp 1,653,062.40
Rp 14,414,347.69
nstruksi Rp 893,583,477.20
No Uraian Pekerjaan
A PEKERJAAN MEKANIKAL
I.1 PEKERJAAN PERALATAN UTAMA AIR BERSIH
1 Ground Tank (Tandon Bawah)
2 Pompa Transfer Air Bersih , Lengkap Pipa Header & Accessoriesnya (1 running, 1 stanby)
Daya Hisap : 6 meter, Daya Dorong : 23 meter
Kapasitas : 90 lt/min, Head : 29m, Power : 750 watt, Voltase : 1 x 220 v
3 Roof Tank Stainless Steel + Kaki, kap.2500 liter Lengkap dudukan & Accessoriesnya
4 Floating Valve
5 Pipa PPR (PN10) dia. 1,5", Pipa Distribusi (dari Pompa Transfer ke Roof tank)
6 Pipa PPR (PN10) dia. 1,5", Pipa Distribusi (dari Roof tank ke Pipa Instalasi Utama)
7 Ball Valve dia. 1,5 "
8 Fitting ( elbow, reducer, knie, dll )
Sub Total I.1
I.2 PEKERJAAN INSTALASI AIR BERSIH
I.2.1 PEKERJAAN INSTALASI AIR BERSIH GEDUNG - IRNA
1 Kran Air dia. 3/4 "
2 Hand Shower Mandi Lengkap
3 Ball Valve dia. 1,5 "
4 Pipa PPR (PN10) dia. 1,5"
5 Pipa PPR (PN10) dia. 1"
6 Pipa PPR (PN10) dia. 3/4"
7 Fitting ( elbow, reducer, knie, dll )
Sub Total II
B PEKERJAAN ELEKTRIKAL
I.1 PEKERJAAN KABEL LISTRIK
1 Kabel NYY 4x25 mm2 (Supply PLN ke P.SDP)
2 Kabel NYY 4x25 mm2 (Supply GENSET ke P.SDP)
3 Kabel NYY 4x6 mm2 (P.SDP ke P.IGD)
4 Kabel NYY 4x10 mm2 (P.SDP ke P.IRNA)
5 Kabel NYY 4x6 mm2 (P.SDP ke P.RADIOLOGI)
6 Kabel NYY 2x4 mm2 (P.SDP ke P.EXISISTING)
7 Grounding Panel Panel Listrik
8 Testing & Commisioning
Sub Total I
5.00 Bh 2,059,600.00 -
Rp. -
1.00 Unit
3.00 Bh 50,200.00 150,600.00
1.00 Bh 875,000.00 875,000.00
3.00 Bh 625,000.00 1,875,000.00
1.00 Bh 3,875,000.00 3,875,000.00
1.00 Bh 58,000.00 58,000.00
1.00 Bh 1,890,625.00 1,890,625.00
1.00 Bh 957,000.00 957,000.00
1.00 Bh 669,000.00 669,000.00
2.00 Bh 669,000.00 1,338,000.00
1.00 Bh 585,000.00 585,000.00
1.00 Bh 4,126,750.00 4,126,750.00
1.00 Unit 3,500,000.00 3,500,000.00
19,899,975.00
1.00 Unit
3.00 Bh 50,200.00 150,600.00
1.00 Bh 957,000.00 957,000.00
3.00 Bh 85,250.00 255,750.00
7.00 Bh 94,600.00 662,200.00
4.00 Bh 94,600.00 378,400.00
6.00 Bh 94,600.00 567,600.00
1.00 Unit 3,500,000.00 3,500,000.00
6,471,550.00
1.00 Unit
3.00 Bh 50,200.00 150,600.00
1.00 Bh 669,000.00 669,000.00
3.00 Bh 85,250.00 255,750.00
6.00 Bh 94,600.00 567,600.00
6.00 Bh 94,600.00 567,600.00
3.00 Bh 94,600.00 283,800.00
1.00 Unit 3,500,000.00 3,500,000.00
5,994,350.00
1.00 Unit
3.00 Bh 50,200.00 150,600.00
1.00 Bh 669,000.00 669,000.00
1.00 Bh 669,000.00 669,000.00
2.00 Bh 85,250.00 170,500.00
1.00 Unit 3,500,000.00 3,500,000.00
5,159,100.00
Rp. 37,524,975.00
53 775,000 41,075,000
1 6,000 6,000
41,081,000
42,671,000
PEKERJAAN PENYAMBUNGAN PDAM
no uraian L1 L2 T1 T2
A PEKERJAAN IGD
I PEKERJAAN GALIAN TANAH
1 Pengukuran dan pemasangan bowplank 11
2 Bongkar bangunan lama
3 Pasang papan nama proyek
4 Pasang papan prasasti
II PEKERJAAN TANAH
1 Galian tanah
Pondasi 1 1.3
Pengurang :
P1 1.66
P2 1.66
P3 1.23
P4 1
P5 0.85
4 Acian
5 Benangan
K1
Sudut dinding
IV PEKERJAAN BETON
1 Lantai kerja pondasi t= 7 cm, mutu K-100 0.8 0.07
b Pembesian
Tulangan utama 0.013
Kait (6D) 0.013
Panjang penyaluran (40D) 0.013
b Pembesian
Tulangan utama 0.013
Panjang penyaluran (40D) 0.013
Sengkang jarak 200 mm 0.008
Kait sengkang 0.008
no uraian L1 L2 T1 T2
4 Sloof beton 15x25 cm, mutu K-225
a Beton K-225 0.15 0.25
b Bekisting 0.25
c Pembesian
c Pembesian
Tipe 1
Tulangan utama 0.01
Sengkang jarak 150 mm 0.008
Kait sengkang 0.008
c Pembesian
Tulangan utama 0.01
Sengkang jarak 100 mm 0.008
Kait sengkang 0.008
b Bekisting
Bagian 1 3
b Bekisting
Bagian 1 0.6
VI PEKERJAAN LANGIT-LANGIT
1 Pasang langit-langit gypsum board, ( 120 X 240 X 9 ) mm
Bagian 1 9
Bagian 2 3
Bagian 3 1.3
Pengurang :
KM 3
no uraian L1 L2 T1 T2
2 Pasang langit-langit GRC board 4mm, ( 120 X 240 X 9 ) mm
KM 3
Plafon teras 0.85
IX PEKERJAAN KERAMIK
1 Pasang lantai Homogeneus Tile (60x60)
Bagian 1 9
Bagian 2 3
Bagian 3 1.3
Pengurang :
KM 1 1.5
X PEKERJAAN PENGECATAN
1 Pengecatan tembok interior
no uraian L1 L2 T1 T2
2 Pengecatan tembok eksterior
Bagian luar bangunan (eksterior) 4
Pengurang:
P2 2.85
P4 2.85
J1 2.25
J2 2.25
B1 0.6
B2 0.6
Void teras 4
3 Pengecatan plafon
d. Plesteran 1 Pc : 3 Ps
Bekisting
Ground tank 4
Pembesian
Ground tank 4 4 20 20
lebar tinggi
panjang perkalian vol sat
rata-ratarata-rata
20 1 = 62.00 m1
1 = 1.00 Ls
1 = 1.00 bh
1 = 1.00 bh
117 1 = 152.10 m³
= 152.10 m³
= 50.70 m³
117 1 = 11.70 m³
= 11.70 m³
18 1 = 16.20 m³
4 1 = 1.20 m³
4 1 = 0.52 m³
11.5 1 = 2.30 m³
16.7 1 = 6.68 m³
= 26.90 m³
18 1 = 32.40 m³
4 1 = 2.40 m³
4 1 = 1.04 m³
= 35.84 m³
117 1 = 51.48 m³
= 51.48 m³
117 1 = 11.70 m³
117 1 = 468.00 m2
2.85 1 = 4.73 m2
2.85 1 = 4.73 m3
2.85 1 = 3.51 m4
2.85 6 = 17.10 m2
2.85 3 = 7.27 m2
= 723.73 m2
4 32 = 128.00 m1
4 6 = 24.00 m1
= 152.00 m1
3 = 3.00 bh
0.8 8 = 0.36 m³
18 1 = 11.34 m³
4 1 = 0.84 m³
4 1 = 0.36 m³
= 12.54 m³
0.8 8 = 1.54 m³
Jml Berat/m
1.76 10 1.04 8 = 146.43 kg
0.078 20 1.04 8 = 12.98 kg
0.52 4 1.04 8 = 17.31 kg
= 176.72 kg
2 16 = 1.57 m³
jumlah Berat/m
2 7 1.04 16 = 232.96 kg
0.52 7 1.04 16 = 60.57 kg
0.629 11 0.4 16 = 44.25 kg
0.048 11 0.4 16 = 3.38 kg
= 341.16 kg
lebar tinggi
panjang perkalian vol sat
rata-ratarata-rata
54 1 = 2.03 m³
koef.
54 1 1 = 27.00 m2
jumlah Berat/m
63 1 = 63.00 m1
0.25 6 = 1.24 m³
= 1.24 m³
5.5 1 6 = 26.40 m2
= 26.40 m2
jumlah Berat/m
26 = 104.00 m1
54 1 = 2.03 m³
koef.
54 1 1 = 35.10 m2
jumlah Berat/m
54 4 0.62 1 = 133.92 kg
0.66 540 0.4 1 = 142.56 kg
0.048 540 0.4 1 = 10.37 kg
= 286.85 kg
63 1 = 63.00 m1
27.61 1 = 27.61 m1
4 1 = 1.20 m³
= 1.20 m³
4 1 1 = 12.00 m2
= 12.00 m2
layer Berat/m
2 0.4 1 = 96.00 kg
= 96.00 kg
14.65 1 = 0.88 m³
= 0.88 m³
layer Berat/m
2 0.4 1 = 70.32 kg
= 70.32 kg
11.25 1 = 0.68 m³
= 0.68 m³
11.25 1 1 = 6.75 m2
= 6.75 m2
layer Berat/m
2 0.4 1 = 54.00 kg
= 54.00 kg
sudut
21 30 1 = 290.98 m2
47.3 1 = 47.34 m1
11.35 1 = 17.59 m2
6.15 1 = 23.99 m2
= 41.58 m2
18 1 = 162.00 m2
4 1 = 12.00 m2
4 1 = 5.20 m2
= 179.20 m2
4 1 = 12.00 m2
= 167.20 m2
lebar tinggi
panjang perkalian vol sat
rata-ratarata-rata
4 1 = 12.00 m2
58 1 = 49.30 m2
= 61.30 m2
164 1 = 164.00 m1
2 = 2.00 bh
2 = 2.00 bh
1.2 2 = 2.40 m1
= 2.40 m1
berat/m
82.54 21.1 1 = 1741.51 kg
11.35 1 = 17.59 m2
6.15 1 = 23.99 m2
= 41.58 m2
= 290.98 m2
= 4740.11 kg
110.3 1 = 110.26 cm
12 1 = 12.00 m1
= 167.20 m2
berat/m
60.8 1 = 60.80 m1
= 60.80 m1
18 1 = 162.00 m2
4 1 = 12.00 m2
4 1 = 5.20 m2
= 179.20 m2
2 2 = 6.00 m2
= 6.00 m2
Total = 173.20 m2
11.5 1 = 23.00 m2
2 2 = 6.00 m2
2 2 = 28.00 m2
= 28.00 m2
164.00 1 = 164.00 m
= 164.00 m
16.7 1 = 66.80 m2
4 1 = 12.80 m2
11.25 1 = 6.75 m2
11.25 1 = 11.25 m2
= 18.00 m2
= 585.86 m2
lebar tinggi
panjang perkalian vol sat
rata-ratarata-rata
56 1 = 224.00 m2
1.66 1 = 4.73 m2
1 2 = 5.70 m2
2.3 5 = 25.88 m2
1.75 6 = 23.63 m2
2.25 4 = 5.40 m2
1.5 6 = 5.40 m2
3.85 1 = 15.40 m2
= 86.13 m2
Total = 137.87 m2
= 167.20 m2
Luas
82.54 0.2684 1 = 22.15 m2
285 0.1172 1 = 33.40 m2
= 55.55 m2
60.80 1 = 18.24 m2
4 1 = 18.72 m³
= 18.72 m³
4 1 = 1.60 m³
= 1.60 m³
8 1 = 9.36 m2
= 9.36 m2
= 9.36 m2
4 1 = 1.12 m³
= 1.12 m³
4 1 = 1.28 m³
= 1.28 m³
4 1 = 16.00 m2
= 16.00 m2
2 0.4 1 = 128.00 kg
= 128.00 kg
no uraian L1 L2 T1 T2
II PEKERJAAN TANAH
1 Galian tanah
Pondasi 1 1.3
Pengurang :
P1 1.66
P2 1.66
4 Acian 4
5 Benangan
K1
Sudut dinding
IV PEKERJAAN BETON
1 Lantai kerja pondasi t= 7 cm, mutu K-100 0.8 0.07
no uraian L1 L2 T1 T2
b Pembesian
Tulangan utama 0.013
Kait (6D) 0.013
Panjang penyaluran (40D) 0.013
b Pembesian
Tulangan utama 0.013
Panjang penyaluran (40D) 0.013
Sengkang jarak 200 mm 0.008
Kait sengkang 0.008
b Bekisting 0.25
c Pembesian
Tulangan utama 0.01
Sengkang jarak 100 mm 0.008
Kait sengkang 0.008
c Pembesian
Tipe 1
Tulangan utama 0.01
Sengkang jarak 150 mm 0.008
Kait sengkang 0.008
c Pembesian
Tulangan utama 0.01
Sengkang jarak 100 mm 0.008
Kait sengkang 0.008
b Bekisting
Bagian 1 4
b Bekisting
Bagian 1 0.6
no uraian L1 L2 T1 T2
VI PEKERJAAN LANGIT-LANGIT
1 Pasang langit-langit gypsum board, ( 120 X 240 X 9 ) mm
Bagian 1 9
Bagian 2 3
Bagian 3 1.2
Pengurang :
KM 1 3
KM 2 1.25
X PEKERJAAN KERAMIK
1 Pasang lantai Homogeneus Tile (60x60)
Bagian 1 9
Bagian 2 3
Bagian 3 1.2
Pengurang :
KM 1 1.5
no uraian L1 L2 T1 T2
4 Pasang dinding keramik ukuran 20 x 20 cm (toilet)
KM 1 1.5 2
XI PEKERJAAN PENGECATAN
1 Pengecatan tembok interior
Pengurang:
P2 2.85
P2 2.85
P4 2.85
J1 2.25
J2 2.25
B1 0.6
B2 0.6
B3 4
2 Pengecatan plafon
lebar tinggi
panjang perkalian vol sat
rata-ratarata-rata
20 1 = 62.00 m1
1 = 1.00 Ls
1 = 1.00 Ls
111 1 = 144.30 m³
= 144.30 m³
= 48.10 m³
111 1 = 11.10 m³
= 11.10 m³
18 1 = 16.20 m³
6 1 = 1.80 m³
11 2 = 2.64 m³
10.15 1 = 2.89 m³
12 1 = 2.40 m³
12 1 = 1.68 m³
= 27.61 m³
18 1 = 32.40 m³
6 1 = 3.60 m³
11 1 = 2.64 m³
= 38.64 m³
111 1 = 48.84 m³
= 48.84 m³
111 1 = 11.10 m³
111 1 = 444.00 m2
2.85 0 = 0.00 m2
2.85 2 = 9.46 m3
111 2 1 = 653.95 m2
4 32 = 128.00 m1
4 6 = 24.00 m1
= 152.00 m1
0.8 8 = 0.36 m³
18 1 = 11.34 m³
6 1 = 1.26 m³
11 2 = 1.85 m³
= 14.45 m³
0.8 8 = 1.54 m³
lebar tinggi
panjang perkalian vol sat
rata-ratarata-rata
Jml Berat/m
1.76 10 1.04 8 = 146.43 kg
0.078 20 1.04 8 = 12.98 kg
0.52 4 1.04 8 = 17.31 kg
= 176.72 kg
2 16 = 1.57 m³
jumlah Berat/m
2 7 1.04 16 = 232.96 kg
0.52 7 1.04 16 = 60.57 kg
0.629 11 0.4 16 = 44.25 kg
0.048 11 0.4 16 = 3.38 kg
= 341.16 kg
jumlah Berat/m
54 4 0.62 1 = 133.92 kg
0.6 540 0.4 1 = 129.60 kg
0.048 540 0.4 1 = 10.37 kg
= 273.89 kg
57 1 = 57.00 m1
0.25 8 = 1.65 m³
= 1.65 m³
5.5 1 8 = 35.20 m2
= 35.20 m2
jumlah Berat/m
26 = 104.00 m1
54 1 = 2.03 m³
koef.
54 1 1 = 35.10 m2
jumlah Berat/m
54 4 0.62 1 = 133.92 kg
0.66 540 0.4 1 = 142.56 kg
0.048 540 0.4 1 = 10.37 kg
= 286.85 kg
57 1 = 57.00 m1
27.41 1 = 27.41 m1
6 1 = 2.40 m³
= 2.40 m³
6 1 1 = 24.00 m2
= 24.00 m2
layer Berat/m
19.5 1 = 1.17 m³
= 1.17 m³
19.5 1 1 = 11.70 m2
= 11.70 m2
layer Berat/m
2 0.4 1 = 93.60 kg
= 93.60 kg
sudut
21 30 1 = 290.98 m2
47.3 1 = 47.34 m1
12.0 1 = 24.00 m2
14 1 = 19.60 m2
10.15 1 = 29.44 m2
= 73.04 m2
lebar tinggi
panjang perkalian vol sat
rata-ratarata-rata
18 1 = 162.00 m2
6 1 = 18.00 m2
11 2 = 26.40 m2
= m2
6 1 = 18.00 m2
2.5 1 = 3.13 m2
= 185.28 m2
6 1 = 18.00 m2
2.5 1 = 3.13 m2
58 1 = 49.30 m2
= 70.43 m2
164 1 = 164.00 m1
5 = 5.00 bh
3 = 3.00 bh
1.2 5 = 6.00 m1
= 6.00 m1
3 = 3.00 bh
3 = 3.00 bh
berat/m
84.94 21.1 1 = 1792.15 kg
11.35 1 = 17.59 m2
10.80 1 = 29.70 m2
1 = 47.29 m2
= 290.98 m2
= 4751.09 kg
111.0 1 = 110.98 cm
12 1 = 12.00 m1
= 185.28 m2
berat/m
60.8 1 = 60.80 m1
= 60.80 m1
18 1 = 162.00 m2
6 1 = 18.00 m2
11 2 = 26.40 m2
= 206.40 m2
2 2 = 6.00 m2
= 6.00 m2
10.15 1 = 28.93 m2
12 1 = 24.00 m2
12 1 = 16.80 m2
= 69.73 m2
2 2 = 6.00 m2
= 6.00 m2
lebar tinggi
panjang perkalian vol sat
rata-ratarata-rata
2 2 = 28.00 m2
= 28.00 m2
164.00 1 = 164.00 m
= 164.00 m
= 581.02 m2
56 1 = 224.00 m2
1.66 2 = 9.46 m2
1.23 2 = 7.01 m2
1 3 = 8.55 m2
2.3 6 = 31.05 m2
1.75 6 = 23.63 m2
2.25 5 = 6.75 m2
0.72 7 = 3.02 m2
3.85 4 = 61.60 m2
= 151.07 m2
Total = 72.93 m2
= 185.28 m2
Luas
84.94 0.2684 1 = 22.80 m2
285 0.1172 1 = 33.40 m2
= 56.20 m2
60.80 1 = 18.24 m2
7. Lebar jalan lama ( bahu + perkerasan + bahu ) ( 0.50 + 4.50 + 0.50 ) meter
11. Jarak rata-rata Base Camp ke lokasi pekerjaan ---> L= 9.73 Kilometer
7.45 Km = a C 7.45 Km = b
A B
6.0 Km = c
Base Camp --------->
D
20 ....................................
21 ....................................
22 ....................................
DAFTAR HARGA BAHAN BANGUNAN
TAHUN ANGGARAN 2018
III. SEMEN
1 M037 Portland Cement (PC) kg
2 M039 Portland Cement (PC) Warna kg
IV. KAYU
Kayu Meranti
1 M061 Usuk : 5/7 m3
2 M063 Papan (2x20) cm m3
3 M064 Papan (3x20) cm m3
Kayu Lain-lain
1 M084 Balok Kayu Kelas III m3
2 M085 Papan Kayu kelas III m3
3 M089 Dolken Kayu Ø 8 cm btg
X. ALAT-ALAT PENGGANTUNG
1 M254 Kunci 2 x putar bh
2 M257 Engsel pintu nylon arch asli bh
3 M258 Engsel jendela nylon arch asli bh
4 M259 Hak Angin bh
5 M262 Grendel Pintu bh
6 M263 Grendel Jendela bh
7 M266 Door Holder bh
XI. KACA
1 M271 Kaca Polos tebal 5 mm m2
XIII. PERPIPAAN
1 M334 Pipa PVC tipe AW Ø 1/2 " m1
2 M338 Pipa PVC tipe AW Ø 2 " m1
3 M340 Pipa PVC tipe AW Ø 3 " m1
4 M341 Pipa PVC tipe AW Ø 4 " m1
5 M379 Pipa Galvanis Ø 1.5 ", tebal 2 mm m1
172,000.00
143,750.00
149,500.00
83,460.00
103,500.00
189,750.00
293,250.00
506,000.00
690.00
196,100.00
6,998.57
1,500.00
3,000.00
###
###
###
###
###
28,800.00
13,800.00
14,000.00
16,650.00
19,460.00
80,500.00
299,000.00
43,250.00
18,600.00
17,250.00
400.00
20,540.00
33,400.00
19,460.00
11,670.00
2,070.00
25,300.00
26,100.00
37,300.00
91,600.00
21,160.00
54,050.00
157,000.00
747,700.00
26,100.00
418,800.00
628,800.00
38,000.00
38,000.00
77,050.00
4,025.00
26,450.00
36,800.00
80,500.00
26,450.00
139,150.00
143,750.00
43,125.00
2,168.00
3,545.00
8,640.00
67,450.00
121,725.00
177,850.00
114,025.00
5,100.00
41,100.00
22,500.00
37,300.00
69,000.00
100,900.00
25,875.00
69,000.00
25,875.00
88,600.00
41,100.00
14,400.00
###
###
8,000.00
18,000.00
16,500.00
21,000.00
750.00
860.00
1,400.00
7,780.00
43,300.00
105,740.00
239,000.00
33,000.00
44,800.00
19,460.00
45,600.00
20,600.00
5,800.00
77,700.00
40.00
237,500.00
11,333.33
DAFTAR HARGA BAHAN BANGUNAN
TAHUN ANGGARAN 2018
BAHAN ARS+STR
NO. KODE BAHAN BANGUNAN SATUAN HARGA
BAHAN ARS+STR
NO. KODE BAHAN BANGUNAN SATUAN HARGA
BAHAN ARS+STR
NO. KODE BAHAN BANGUNAN SATUAN HARGA
BAHAN ARS+STR
NO. KODE BAHAN BANGUNAN SATUAN HARGA
BAHAN ARS+STR
NO. KODE BAHAN BANGUNAN SATUAN HARGA
BAHAN ARS+STR
NO. KODE BAHAN BANGUNAN SATUAN HARGA
BAHAN ARS+STR
NO. KODE BAHAN BANGUNAN SATUAN HARGA
BAHAN ARS+STR
NO. KODE BAHAN BANGUNAN SATUAN HARGA
BAHAN ARS+STR
NO. KODE BAHAN BANGUNAN SATUAN HARGA
BAHAN ARS+STR
NO. KODE BAHAN BANGUNAN SATUAN HARGA
BAHAN ARS+STR
NO. KODE BAHAN BANGUNAN SATUAN HARGA
BAHAN ARS+STR
NO. KODE BAHAN BANGUNAN SATUAN HARGA
BAHAN ARS+STR
NO. KODE BAHAN BANGUNAN SATUAN HARGA
BAHAN ARS+STR
NO. KODE BAHAN BANGUNAN SATUAN HARGA
BAHAN ARS+STR
NO. KODE BAHAN BANGUNAN SATUAN HARGA
BAHAN ARS+STR
NO. KODE BAHAN BANGUNAN SATUAN HARGA
BAHAN ARS+STR
NO. KODE BAHAN BANGUNAN SATUAN HARGA
BAHAN ARS+STR
NO. KODE BAHAN BANGUNAN SATUAN HARGA
BAHAN ARS+STR
NO. KODE BAHAN BANGUNAN SATUAN HARGA
BAHAN ARS+STR
NO. KODE BAHAN BANGUNAN SATUAN HARGA
BAHAN ARS+STR
NO. KODE BAHAN BANGUNAN SATUAN HARGA
BAHAN ARS+STR
NO. KODE BAHAN BANGUNAN SATUAN HARGA
BAHAN ARS+STR
NO. KODE BAHAN BANGUNAN SATUAN HARGA
BAHAN ARS+STR
HARGA BAHAN BANGUNAN
UN ANGGARAN 2018
KET.
BAHAN ARS+STR
KET.
BAHAN ARS+STR
KET.
BAHAN ARS+STR
KET.
BAHAN ARS+STR
KET.
BAHAN ARS+STR
KET.
BAHAN ARS+STR
KET.
BAHAN ARS+STR
KET.
BAHAN ARS+STR
KET.
BAHAN ARS+STR
KET.
BAHAN ARS+STR
KET.
BAHAN ARS+STR
KET.
BAHAN ARS+STR
KET.
BAHAN ARS+STR
KET.
BAHAN ARS+STR
KET.
BAHAN ARS+STR
KET.
BAHAN ARS+STR
KET.
BAHAN ARS+STR
KET.
BAHAN ARS+STR
KET.
BAHAN ARS+STR
KET.
BAHAN ARS+STR
KET.
BAHAN ARS+STR
KET.
BAHAN ARS+STR
KET.
BAHAN ARS+STR
KET.
BAHAN ARS+STR
KET.
BAHAN ARS+STR
DAFTAR HARGA BAHAN BANGUNAN
Ke
lom NO. NAMA / JENIS BAHAN
pok
1 2 3
MEKANIKAL
A PEKERJAAN AIR BERSIH, AIR KOTOR & AIR BEKAS
1 Pompa Air Bersih , Lengkap Accessoriesnya
Daya Hisap : 6 meter, Daya Dorong : 23 meter
Kapasitas : 90 lt/min, Head : 29m, Power : 750 watt, Voltase : 1 x 220 v
2 Roof Tank Stainless Steel + Kaki, kap.2500 liter
3 Ball Valve 1,5"
4 Kran Air
5 Hand Shower Mandi Lengkap
6 Floating Valve
7 Bioseptic Kap.300 L
8 Pipa PPR (PN10) dia 1/2"
9 Pipa PPR (PN10) dia 3/4"
10 Pipa PPR (PN10) dia 1"
11 Pipa PPR (PN10) dia 1 1/2"
12 Pipa PVC - AW dia 1/2"
13 Pipa PVC - AW dia 1 1/2"
14 Pipa PVC - AW dia 2"
15 Pipa PVC - AW dia 3"
16 Pipa PVC - AW dia 4"
17 Pipa PVC - AW dia 6"
18 Sumur Resapam ( Buis Beton uk.100x50cm)
19 Floor Draine dia. 2 1/2"
20 Clean Out dia. 3"
21 Clean Out dia. 4"
22 Clean Out dia. 6"
ELEKTRIKAL
A PEKERJAAN LISTRIK
1 - NYY 4x25 MM²
2 - NYY 4 x 10 MM²
3 - NYY 4 x 6 MM²
4 - NYY 2 x 4 MM²
5 - NYY 3 x 2,5 MM²
6 - NYM 3 x 2.5 MM²
C PEKERJAAN PANEL
1 Pilot Lamp + Fuse
2 Voltmeter
3 Amperemeter
4 KW Meter
5 Selector Voltage
6 MCCB 3P 80A 15KA
7 MCB 3P 50A 10KA
8 MCB 3P 32A 10KA
9 MCB 3P 25A 10KA
10 MCB 3P 16A 10KA
11 COS 80A
12 MCB 1P 32A 10KA
13 MCB 1P 16A 6KA
14 MCB 1P 10A 6KA
15 MCB 1P 6A 6KA
16 MCB 1P 4A 6KA
17 MCB 1P 10A 4,5KA
18 MCB 1P 6A 4,5KA
19 MCB 1P 4A 4,5KA
20 MCB 1P 2A 4,5KA & Box
20 Box Panel + Wiring
21 Timer
SATUAN HARGA
SATUAN BAHAN
4 5
Bh Rp. 397,500.00
Bh Rp. 95,000.00
Bh Rp. 86,250.00
Bh Rp. 115,000.00
Bh Rp. 93,750.00
Bh Rp. 375,000.00
Bh Rp. 281,250.00
Bh Rp. 937,500.00
Bh Rp. 1,875,000.00
Bh Rp. 3,500,000.00
Bh Rp. 185,000.00
Bh Rp. 30,600.00
Bh Rp. 47,500.00
Bh Rp. 78,000.00
Bh Rp. 800,000.00
Bh Rp. 1,450,000.00
Bh Rp. 98,000.00
Bh Rp. 24,300.00
Bh Rp. 89,000.00
m' Rp. 4,800.00
Ls Rp. 5,000.00
Bh Rp. 1,000.00
Bh Rp. 250.00
Bh Rp. 6,500.00
m' Rp. 7,500.00
Bh Rp. 2,700.00
Bh Rp. 250,000.00
m' Rp. 121,200.00
m' Rp. 127,000.00
Bh Rp. 200,000.00
Bh Rp. 45,000.00
Bh Rp. 350,000.00
Ls Rp. 25,000.00
Titik Rp. 85,000.00
Ls Rp. 750,000.00
m' Rp. 22,500.00
Ls Rp. 750,000.00
UPAH ARS+STR
DAFTAR HARGA UPAH KERJA
1 2 3
125,000.00
115,000.00
95,000.00
85,000.00
DAFTAR PERALATAN
TAHUN ANGGARAN 2018
ALAT ARS+STR
KODE URAIAN SATUAN HARGA
ALAT ARS+STR
DAFTAR PERALATAN
TAHUN ANGGARAN 2018
KETERANGAN
rga konsultan
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
ALAT ARS+STR
KETERANGAN
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
ALAT ARS+STR
REKAPITULASI ANALISA HARGA SATUAN PEKERJAAN (RAHSP)
DINAS KEBERSIHAN DAN PERTAMANAN
TAHUN ANGGARAN 2018
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
I. PEKERJAAN PERSIAPAN
A.001 Pagar sementara dari kayu, tinggi 2 meter m1
A.002 Pagar sementara dari seng gelombang, tinggi 2 meter m1
A.003 Pagar sementara dari kawat duri, tinggi 1.8 meter m1
A.004 Pasang pagar kawat jaring galvanis, tinggi 1 m m1
A.005 Pengukuran dan pemasangan bouwplank m1
A.006 Pembuatan kantor sementara m2
A.007 Pembuatan gudang semen dan alat-alat m2
A.008 Pembuatan rumah jaga/konstruksi kayu m2
A.009 Membersihkan lapangan dan perataan m2
A.010 Pembuatan bedeng buruh m2
A.011 Pembuatan bak adukan, ukuran (40x50x20) cm bh
A.012 Pembuatan jalan sementara m2
A.013 Bongkar pasang kayu kuda-kuda / kusen / loteng m3
A.014 Bongkaran beton bertulang m3
A.015 Bongkaran tembok bata merah m3
A.016 Bongkaran atap m2
A.017 Bongkaran lantai m2
A.018 Bongkaran plafon m2
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
B.019 Galian tanah keras sedalam > 10 m m3
B.020 Pembuangan tanah sejauh > 1 km m3
B.021 Perataan Lahan m3
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
C.008 Pasang pondasi batu kali 1/4 Pc : 1 Kp : 4 Ps m3
C.009 Pasang pondasi batu kosong m3
C.010 Pasang pondasi siklop, 40% batu kali m3
C.011 Pasang pondasi sumuran, diameter 100 cm m3
C.012 Mortar Tipe M (setara dengan campuran 1 Pc : 2 Pp) m3
C.013 Mortar Tipe S (setara dengan campuran 1 Pc : 3 Pp) m3
C.014 Mortar Tipe N (setara dengan campuran 1 Pc : 4 Pp) m3
C.015 Mortar Tipe O (setara dengan campuran 1 Pc : 5 Pp) m3
C.016 Siaran dengan Mortar Tipe M (setara dengan campuran 1 Pc : 2 Pp) m2
C.017 Siaran dengan Mortar Tipe S (setara dengan campuran 1 Pc : 3 Pp) m2
C.018 Trasraam tebal 1 cm dengan mortar tipe M (setara dengan campuran 1 Pc m2
C.019 Plesteran tebal 1 cm dengan mortar tipe S (setara dengan campuran 1 Pc m2
C.020 Plesteran tebal 1 cm dengan mortar tipe N (setara dengan campuran 1 Pc m2
C.021 Trasraam tebal 1,5 cm dengan mortar tipe M (setara dengan campuran 1 P m2
C.022 Plesteran tebal 1,5 cm dengan mortar tipe S (setara dengan campuran 1 P m2
C.023 Plesteran tebal 1,5 cm dengan mortar tipe N (setara dengan campuran 1 P m2
C.024 Pasangan batu kosong m2
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
D.025 Pasang Batu Bata Tahan Api m2
D.026 Pasang bata ringan m2
V. PEKERJAAN PLESTERAN
E.001 Plesteran 1 Pc : 1 Ps tebal 15 mm m2
E.002 Plesteran 1 Pc : 2 Ps tebal 15 mm m2
E.003 Plesteran 1 Pc : 3 Ps tebal 15 mm m2
E.004 Plesteran 1 Pc : 4 Ps tebal 15 mm m2
E.005 Plesteran 1 Pc : 5 Ps tebal 15 mm m2
E.006 Plesteran 1 Pc : 6 Ps tebal 15 mm m2
E.007 Plesteran 1 Pc : 7 Ps tebal 15 mm m2
E.008 Plesteran 1 Pc : 8 Ps tebal 15 mm m2
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
E.009 Plesteran 1 Pc : 0.5 Kp : 3 Ps tebal 15 mm m2
E.010 Plesteran 1 Pc : 2 Kp : 8 Ps tebal 15 mm m2
E.011 Plesteran 1 Kp : 1 Sm : 1 Ps tebal 15 mm m2
E.012 Plesteran 1 Kp : 1 Sm : 2 Ps tebal 15 mm m2
E.013 Plesteran 1 Pc : 2 Ps tebal 20 mm m2
E.014 Plesteran 1 Pc : 3 Ps tebal 20 mm m2
E.015 Plesteran 1 Pc : 4 Ps tebal 20 mm m2
E.016 Plesteran 1 Pc : 5 Ps tebal 20 mm m2
E.017 Plesteran 1 Pc : 6 Ps tebal 20 mm m2
E.018 Plesteran 1 Kp : 1 Sm : 2 Ps tebal 20 mm m2
E.019 Berapen 1 Pc : 5 Ps, tebal 15 mm m2
E.020 Plesteran skoning 1 Pc : 2 Ps tebal 10 mm m2
E.021 Plesteran granito 1 Pc warna : 2 granito tebal 10 mm m2
E.022 Plesteran teraso 1 Pc warna : 2 batu teraso, tebal 10 mm m2
E.023 Plesteran ciprat 1 Pc : 2 Ps m2
E.024 Plesteran siar pasangan batu kali adukan 1 Pc : 2 Ps m2
E.025 Benangan m1
E.026 Acian m2
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
F.024 Pasang pintu plywood rangkap, rangka kayu meranti m2
F.025 Pasang jalusi mati kusen kayu jati m2
F.026 Pasang jalusi mati kusen kayu kamper m2
F.027 Pasang jalusi mati kusen kayu borneo m2
F.028 Pasang jalusi mati kusen kayu meranti m2
F.029 Pasang pintu teakwood rangkap, rangka kayu jati m2
F.030 Pasang pintu teakwood rangkap, rangka kayu kamper m2
F.031 Pasang pintu teakwood rangkap, rangka kayu borneo m2
F.032 Pasang pintu teakwood rangkap, rangka kayu meranti m2
F.033 Pasang pintu plywood dan formika, rangka kayu jati m2
F.034 Pasang pintu plywood dan formika, rangka kayu kamper m2
F.035 Pasang pintu plywood dan formika, rangka kayu borneo m2
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
F.036 Pasang pintu plywood dan formika, rangka kayu meranti m2
F.037 Pasang pintu teakwood dan formika, rangka kayu jati m2
F.038 Pasang pintu teakwood dan formika, rangka kayu borneo (divernis) m2
F.039 Pasang pintu teakwood dan formika, rangka kayu meranti (divernis) m2
F.040 Pasang konstruksi kuda-kuda kayu jati m3
F.041 Pasang konstruksi kuda-kuda kayu kamper m3
F.042 Pasang konstruksi kuda-kuda kayu borneo m3
F.043 Pasang konstruksi kuda-kuda kayu kruing m3
F.044 Pasang konstruksi kuda-kuda kayu meranti m3
F.045 Pasang konstruksi kuda-kuda ekspose kayu jati m3
F.046 Pasang konstruksi kuda-kuda ekspose kayu kamper m3
F.047 Pasang konstruksi gording kayu kamper m3
F.048 Pasang konstruksi gording kayu meranti m3
F.049 Pasang kaso 5/7 + reng 3/5 genteng biasa kayu jati m2
F.050 Pasang kaso 5/7 + reng 3/5 genteng biasa kayu kamper m2
F.051 Pasang kaso 5/7 + reng 3/5 genteng biasa kayu borneo m2
F.052 Pasang kaso 5/7 + reng 3/5 genteng biasa kayu kruing m2
F.053 Pasang kaso 5/7 + reng 3/5 genteng biasa kayu meranti m2
F.054 Pasang kaso 5/7 + reng 3/5 genteng karangpilang kayu jati m2
F.055 Pasang kaso 5/7 + reng 3/5 genteng karangpilang kayu kamper m2
F.056 Pasang kaso 5/7 + reng 3/5 genteng karangpilang kayu borneo m2
F.057 Pasang kaso 5/7 + reng 3/5 genteng karangpilang kayu kruing m2
F.058 Pasang kaso 5/7 + reng 3/5 genteng karangpilang kayu meranti m2
F.059 Pasang kaso 5/7 + reng 3/5 genteng beton kayu jati m2
F.060 Pasang kaso 5/7 + reng 3/5 genteng beton kayu kamper m2
F.061 Pasang kaso 5/7 + reng 3/5 genteng beton kayu borneo m2
F.062 Pasang kaso 5/7 + reng 3/5 genteng beton kayu kruing m2
F.063 Pasang kaso 5/7 + reng 3/5 genteng beton kayu meranti m2
F.064 Pasang kaso 5/7 + reng 3/5 atap sirap kayu jati m2
F.065 Pasang kaso 5/7 + reng 3/5 atap sirap kayu kamper m2
F.066 Pasang kaso 5/7 + reng 3/5 atap sirap kayu borneo m2
F.067 Pasang kaso 5/7 + reng 3/5 atap sirap kayu kruing m2
F.068 Pasang kaso 5/7 + reng 3/5 atap sirap kayu meranti m2
F.069 Pasang rangka langit-langit (0.5 x 1.0) m, kayu jati m2
F.070 Pasang rangka langit-langit (0.5 x 1.0) m, kayu kamper m2
F.071 Pasang rangka langit-langit (0.5 x 1.0) m, kayu borneo m2
F.072 Pasang rangka langit-langit (0.5 x 1.0) m, kayu kruing m2
F.073 Pasang rangka langit-langit (0.5 x 1.0) m, kayu meranti m2
F.074 Pasang lisplang ukuran (3 x 20) cm, kayu jati m1
F.075 Pasang lisplang ukuran (3 x 20) cm, kayu kamper m1
F.076 Pasang lisplang ukuran (3 x 20) cm, kayu borneo m1
F.077 Pasang lisplang ukuran (3 x 20) cm, kayu kruing m1
F.078 Pasang lisplang ukuran (3 x 20) cm, kayu meranti m1
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
F.079 Pasang lisplang ukuran (3 x 30) cm, kayu jati m1
F.080 Pasang lisplang ukuran (3 x 30) cm, kayu kamper m1
F.081 Pasang lisplang ukuran (3 x 30) cm, kayu borneo m1
F.082 Pasang lisplang ukuran (3 x 30) cm, kayu kruing m1
F.083 Pasang lisplang ukuran (3 x 30) cm, kayu meranti m1
F.084 Pasang rangka dinding pemisah kayu jati m1
F.085 Pasang rangka dinding pemisah kayu kamper m1
F.086 Pasang rangka dinding pemisah kayu borneo m1
F.087 Pasang rangka dinding pemisah kayu meranti m1
F.088 Pasang rangka dinding pemisah teakwood rangkap, rangka kayu jati m2
F.089 Pasang rangka dinding pemisah teakwood rangkap, rangka kayu kamper m2
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
F.090 Pasang rangka dinding pemisah teakwood rangkap, rangka kayu borneo m2
F.091 Pasang rangka dinding pemisah teakwood rangkap, rangka kayu meranti m2
F.092 Pasang rangka dinding pemisah plywood rangkap, rangka kayu jati m2
F.093 Pasang rangka dinding pemisah plywood rangkap, rangka kayu kamper m2
F.094 Pasang rangka dinding pemisah plywood rangkap, rangka kayu borneo m2
F.095 Pasang rangka dinding pemisah plywood rangkap, rangka kayu meranti m2
F.096 Pasang dinding lambriziring dari papan jati m2
F.097 Pasang dinding lambriziring dari papan kamper m2
VII. PEKERJAAN BETON
G.001 Beton mutu fc'=7,4 Mpa (K100) slump (12 ± 2) cm, w/c = 0,87 (Manual) m3
G.001a Beton mutu fc'=7,4 Mpa (K100) slump (12 ± 2) cm, w/c = 0,87 (dengan m3
G.002 Beton mutu fc'=9,8 Mpa (K125) slump (12 ± 2) cm, w/c = 0,78 (Manual) m3
G.002a Beton mutu fc'=9,8 Mpa (K125) slump (12 ± 2) cm, w/c = 0,78 (dengan m3
G.003 Beton mutu fc'=12,2 Mpa (K150) slump (12 ± 2) cm, w/c = 0,72 (Manual m3
G.003a Beton mutu fc'=12,2 Mpa (K150) slump (12 ± 2) cm, w/c = 0,72 (dengan m3
G.004 Lantai kerja beton mutu fc'=7,4 Mpa (K100) slump (3 - 6) cm, w/c = 0,87 m3
G.005 Beton mutu fc'=14,5 Mpa (K175) slump (12 ± 2) cm, w/c = 0,66 (Manual m3
G.005a Beton mutu fc'=14,5 Mpa (K175) slump (12 ± 2) cm, w/c = 0,66 (dengan m3
G.006 Beton mutu fc'=16,9 Mpa (K200) slump (12 ± 2) cm, w/c = 0,61 (Manual m3
G.006a Beton mutu fc'=16,9 Mpa (K200) slump (12 ± 2) cm, w/c = 0,61 (dengan m3
G.007 Beton mutu fc'=19,3 Mpa (K225) slump (12 ± 2) cm, w/c = 0,58 (Manual m3
G.007a Beton mutu fc'=19,3 Mpa (K225) slump (12 ± 2) cm, w/c = 0,58 (denga m3
G.008 Beton mutu fc'=21,7 Mpa (K250) slump (12 ± 2) cm, w/c = 0,56 (Manual m3
G.008a Beton mutu fc'=21,7 Mpa (K250) slump (12 ± 2) cm, w/c = 0,56 (dengan m3
G.009 Beton mutu fc'=24,0 Mpa (K275) slump (12 ± 2) cm, w/c = 0,53 (Manual m3
G.009a Beton mutu fc'=24,0 Mpa (K275) slump (12 ± 2) cm, w/c = 0,53 (dengan m3
G.010 Beton mutu fc'=26,4 Mpa (K300) slump (12 ± 2) cm, w/c = 0,52 (Manual m3
G.010a Beton mutu fc'=26,4 Mpa (K300) slump (12 ± 2) cm, w/c = 0,52 (dengan m3
G.011 Beton mutu fc'=28,8 Mpa (K325) slump (12 ± 2) cm, w/c = 0,49 (Manual m3
G.011a Beton mutu fc'=28,8 Mpa (K325) slump (12 ± 2) cm, w/c = 0,49 (dengan m3
G.012 Beton mutu fc'=31,2 Mpa (K350) slump (12 ± 2) cm, w/c = 0,48 (Manual m3
G.012a Beton mutu fc'=31,2 Mpa (K350) slump (12 ± 2) cm, w/c = 0,48 (dengan m3
G.013 Beton kedap air dengan strorox - 100 m3
G.014 Pasang PVC Waterstop lebar 150 mm m1
G.015 Pasang PVC Waterstop lebar 200 mm m1
G.016 Pasang PVC Waterstop lebar 230 mm ~ 320 mm m1
G.016a Pasang PVC Waterstop Rubber lebar 150 mm - 200 mm m1
G.017 Pembesian 10 kg dengan besi polos kg
G.018 Pembesian dengan besi ulir kg
G.018a Penambahan koefisien mengangkut/menaikkan tulangan
setiap kenaikan 4 m vertikal atau setiap 25 m horizontal ke lokasi (Manua kg
G.018b Penambahan koefisien mengangkut/menaikkan tulangan
setiap kenaikan 4 m vertikal atau setiap 25 m horizontal ke lokasi (Meka kg
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
G.018c Penambahan koefisien mengangkut/menaikkan tulangan setiap kenaikan 4 m vertikal
atau setiap 25 m horizontal ke lokasi (Mekanis penambahan 25 m) kg
G.019 Kabel prestressed polos/strands kg
G.020 Memasang 1 kg jaring kawat baja / wire mesh kg
G.021 Pasang bekisting untuk pondasi m2
G.022 Pasang bekisting untuk pondasi (2x pakai) m2
G.023 Pasang bekisting untuk sloof m2
G.024 Pasang bekisting untuk sloof (2x pakai) m2
G.025 Pasang bekisting untuk kolom m2
G.026 Pasang bekisting untuk kolom (2x pakai) m2
G.027 Pasang bekisting untuk balok m2
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
G.028 Pasang bekisting untuk balok (2x pakai) m2
G.029 Pasang bekisting untuk plat lantai m2
G.030 Pasang bekisting untuk plat lantai (2x pakai) m2
G.031 Pasang bekisting untuk dinding m2
G.032 Pasang bekisting untuk dinding (2x pakai) m2
G.033 Pasang bekisting untuk tangga m2
G.034 Pasang bekisting untuk tangga (2x pakai) m2
G.035 Pasang jembatan cor / Talang Cor m2
G.036 Pondasi beton bertulang (150 kg besi + bekisting) m3
G.037 Sloof beton bertulang (200 kg besi + bekisting) m3
G.038 Kolom beton bertulang (150 kg besi + bekisting) m3
G.039 Kolom beton bertulang (300 kg besi + bekisting) m3
G.040 Balok beton bertulang (200 kg besi + bekisting) m3
G.041 Dinding beton bertulang (150 kg besi + bekisting) m3
G.042 Dinding beton bertulang (200 kg besi + bekisting) m3
G.043 Kolom penguat beton bertulang (11 x 11) cm m1
G.044 Ring balok beton bertulang (10 x 15) cm m1
G.045 Sloof beton bertulang (10 x 15) cm m1
G.046 Beton untuk Lantai Kerja (bedding) m3
G.047 Bongkar Bekisting secara biasa m2
G.048 Bongkar Bekisting secara hati-hati m2
G.049 Menggenangi air 100 m2 permukaan Beton 100 m2
G.050 Memasang 100 m2 terpal/karung goni basah pada permukaan beton 100 m2
G.051 Menyirami Terpal/karung goni dengan air selama 4 hari m2
G.052 Bongkar Beton secara Konvensional (dlm Rangka Renovasi) m2
G.053 Bongkar Beton dengan Jack Hammer m2
G.054 Pemancangan Tiang Pancang Kayu gelondongan dengan Hammer/tanpa M m'
G.055 Pemancangan Tiang Pancang Baja Pipa dengan Hammer/tanpa Mesin m'
G.056 Pemancangan Tiang Pancang Baja Kotak dengan Hammer/tanpa Mesin m'
G.057 Pemancangan Tiang Baja Beton Bertulang (30 x 30 cm) dengan Hammer/ m'
G.058 Pemancangan Tiang Baja Beton Bertulang (40 x 40 cm) dengan Hammer/ m'
G.059 Pemancangan Turap Kayu Dolken dengan Hammer/tanpa Mesin m'
G.060 Pemancangan Turap Baja Profil Larsen dengan Hammer/tanpa Mesin m'
G.061 Pemancangan Turap Beton Bertulang Precast (30 x 12 cm) dengan Hamm m'
G.062 Pemancangan Turap Beton Bertulang Precast (40 x 15 cm) dengan Hamm m'
G.063 Pemancangan Tiang Pancang Kayu gelondongan dengan Mesin Tenaga Ua m'
G.064 Pemancangan Tiang Pancang Baja Pipa (30 x 30 cm) dengan Mesin Tenag m'
G.065 Pemancangan Tiang Pancang Baja Kotak (30 x 30 cm) dengan Mesin Tena m'
G.066 Pemancangan Tiang Baja Beton Bertulang (30 x 30 cm) dengan Mesin Te m'
G.067 Pemancangan Tiang Baja Beton Bertulang (40 x 40 cm) dengan Mesin Te m'
G.068 Pemancangan Turap Kayu Dolken dengan Mesin Tenaga Uap m'
G.069 Pemancangan Turap Baja Profil Larsen dengan Mesin Tenaga Uap m'
G.070 Pemancangan Turap Beton Bertulang Precast (30 x 12 cm) dengan Mesin m'
G.071 Pemancangan Turap Beton Bertulang Precast (40 x 15 cm) dengan Mesin m'
G.072 Pemancangan Tiang Pancang Kayu gelondongan dengan Mesin Tenaga Ua m'
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
G.073 Pemancangan Tiang Pancang Baja Pipa (30 x 30 cm) dengan Mesin Tenag m'
G.074 Pemancangan Tiang Pancang Baja Kotak (30 x 30 cm) dengan Mesin Tena m'
G.075 Pemancangan Tiang Baja Beton Bertulang (30 x 30 cm) dengan Mesin Te m'
G.076 Pemancangan Tiang Baja Beton Bertulang (40 x 40 cm) dengan Mesin Te m'
G.077 Pemancangan Turap Kayu Dolken dengan Mesin Tenaga Uap m'
G.078 Pemancangan Turap Baja Profil Larsen dengan Mesin Tenaga Uap m'
G.079 Pemancangan Turap Beton Bertulang Precast (30 x 12 cm) dengan Mesin m'
G.080 Pemancangan Turap Beton Bertulang Precast (40 x 15 cm) dengan Mesin m'
G.081 Pemancangan Tiang Pancang Kayu gelondongan dengan Kompressor Uda m'
G.082 Pemancangan Tiang Pancang Baja Pipa (30 x 30 cm) dengan Kompressor m'
G.083 Pemancangan Tiang Pancang Baja Kotak (30 x 30 cm) dengan Kompresso m'
G.084 Pemancangan Tiang Baja Beton Bertulang (30 x 30 cm) dengan Kompress m'
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
G.085 Pemancangan Tiang Baja Beton Bertulang (40 x 40 cm) dengan Kompress m'
G.086 Pemancangan Turap Kayu Dolken dengan Kompressor Udara m'
G.087 Pemancangan Turap Baja Profil Larsen dengan Kompressor Udara m'
G.088 Pemancangan Turap Beton Bertulang Precast (30 x 12 cm) dengan Kompr m'
G.089 Pemancangan Turap Beton Bertulang Precast (40 x 15 cm) dengan Kompr m'
G.090 Bekisting untuk Permukaan Beton Biasa dengan Multiplek 12 mm (tanpa p m2
G.091 Bekisting untuk Permukaan Beton Biasa dengan Multiplek 12 mm (tanpa p m2
G.092 Bekisting untuk Permukaan Beton Biasa dengan Multiplek 18 mm (tanpa p m2
G.093 Bekisting untuk Permukaan Beton Biasa dengan Multiplek 18 mm (tanpa p m2
G.094 Bekisting untuk Permukaan Beton Biasa dengan Papan Ukuran 3/20 cm (ta m2
G.095 Bekisting untuk Permukaan Beton Biasa dengan Papan Ukuran 3/20 cm (ta m2
G.096 Bekisting untuk Permukaan Beton Expose dengan Multiplek 12 mm-kasso 5 m2
G.097 Bekisting untuk Permukaan Beton Expose dengan Multiplek 12 mm-kasso 5 m2
G.098 Bekisting untuk Permukaan Beton Expose dengan Multiplek 18 mm-kasso 5 m2
G.099 Bekisting untuk Permukaan Beton Expose dengan Multiplek 18 mm-kasso 5 m2
G.100 Perancah bekisting kasso 5/7 tinggi 4 m untuk 1 kali pakai m2
G.101 Perancah bekisting kasso 5/7 tinggi 4 m untuk 2 kali pakai m2
G.102 Perancah bekisting kayu dolken diameter 8 cm - 10 cm, tinggi 4 m untuk 1 m2
G.103 Perancah bekisting kayu dolken diameter 8 cm - 10 cm, tinggi 4 m untuk 2 m2
G.104 Bekisting Balok Biasa dibuat ditempat dengan Multiplek 12 mm (tanpa per m2
G.105 Bekisting Balok Biasa dibuat ditempat dengan Multiplek 12 mm (tanpa per m2
G.106 Bekisting Balok Biasa dibuat ditempat dengan Multiplek 18 mm (tanpa per m2
G.107 Bekisting Balok Biasa dibuat ditempat dengan Multiplek 18 mm (tanpa per m2
G.108 Perancah Bekisting Balok Biasa dibuat ditempat dengan Kasso 5/7, tinggi 4 m2
G.109 Perancah Bekisting Balok Biasa dibuat ditempat dengan Kasso 5/7, tinggi 4 m2
G.110 Perancah Bekisting Balok dengan kayu Dolken diameter 8 cm dibuat ditemp m2
G.111 Perancah Bekisting Balok dengan kayu Dolken diameter 8 cm dibuat ditemp m2
G.112 Bekisting Kolom Beton dengan Multiplek 12 mm dibuat di tempat (1x paka m2
G.113 Bekisting Kolom Beton dengan Multiplek 12 mm dibuat di tempat (2x paka m2
G.114 Bekisting Kolom Beton dengan Multiplek 18 mm dibuat di tempat (1x paka m2
G.115 Bekisting Kolom Beton dengan Multiplek 12 mm dibuat di tempat (2x paka m2
G.116 Bekisting Kolom Beton Biasa dengan papan ukuran 3/20 dibuat di tempat m2
G.117 Bekisting Kolom Beton Biasa dengan papan ukuran 3/20 dibuat di tempat m2
G.118 Bekisting Dinding Beton Biasa dengan Multiplek 12 mm dibuat di tempat ( m2
G.119 Bekisting Dinding Beton Biasa dengan Multiplek 12 mm dibuat di tempat ( m2
G.120 Bekisting Dinding Beton Biasa dengan Multiplek 18 mm dibuat di tempat ( m2
G.121 Bekisting Dinding Beton Biasa dengan Multiplek 18 mm dibuat di tempat ( m2
G.122 Bekisting Dinding Beton Biasa dengan papan ukuran 3/20 dibuat di tempa m2
G.123 Bekisting Dinding Beton Biasa dengan papan ukuran 3/20 dibuat di tempa m2
G.124 Bekisting Pondasi dan Sloof Beton Biasa dengan Multiplek 12 mm dibuat d m2
G.125 Bekisting Pondasi dan Sloof Beton Biasa dengan Multiplek 12 mm dibuat d m2
G.126 Bekisting Pondasi dan Sloof Beton Biasa dengan Multiplek 18 mm dibuat d m2
G.127 Bekisting Pondasi dan Sloof Beton Biasa dengan Multiplek 18 mm dibuat d m2
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
G.128 Bekisting Pondasi dan Sloof Beton Biasa dengan papan ukuran 3/20 dibuat m2
G.129 Bekisting Pondasi dan Sloof Beton Biasa dengan papan ukuran 3/20 dibuat m2
: Pembesian dengan besi polos kg
VIII. PEKERJAAN PENUTUP ATAP
H.001 Pasang atap genteng biasa ex. Malang m2
H.002 Pasang atap genteng press ex.Trenggalek m2
H.003 Pasang atap genteng karangpilang ex. Malang m2
H.004 Pasang atap genteng karangpilang ex. Trenggalek m2
H.005 Pasang atap genteng karangpilang ex. Surabaya m2
H.006 Pasang bubung genteng biasa ex. Malang m1
H.007 Pasang bubung genteng press ex. Trenggalek m1
H.008 Pasang bubung genteng karangpilang ex. Malang m1
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
H.009 Pasang bubung genteng karangpilang ex. Trenggalek m1
H.010 Pasang bubung genteng karangpilang ex. Surabaya m1
H.011 Pasang atap genteng palentong kecil m2
H.012 Pasang atap genteng kodok glazuur m2
H.013 Pasang atap genteng palentong super / besar m2
H.014 Pasang atap genteng beton m2
H.015 Pasang atap genteng aspal m2
H.016 Pasang atap genteng metal m2
H.017 Pasang atap sirap m2
H.018 Pasang bubung genteng palentong kecil m1
H.019 Pasang bubung genteng kodok glazuur m1
H.020 Pasang bubung genteng palentong super / besar m1
H.021 Pasang bubung genteng beton m1
H.022 Pasang bubung genteng aspal m1
H.023 Pasang bubung genteng metal m1
H.024 Pasang bubung atap sirap m1
H.025 Pasang atap asbes gelombang (3.00 x 1.05 m) x 4 mm m2
H.026 Pasang atap asbes gelombang (2.70 x 1.05 m) x 4 mm m2
H.027 Pasang atap asbes gelombang (2.40 x 1.05 m) x 4 mm m2
H.028 Pasang atap asbes gelombang (2.10 x 1.05 m) x 4 mm m2
H.029 Pasang atap asbes gelombang (1.50 x 1.05 m) x 4 mm m2
H.030 Pasang atap asbes gelombang (2.50 x 0.92 m) x 5 mm m2
H.031 Pasang atap asbes gelombang (2.25 x 0.92 m) x 5 mm m2
H.032 Pasang atap asbes gelombang (2.00 x 0.92 m) x 5 mm m2
H.033 Pasang atap asbes gelombang (1.80 x 0.92 m) x 5 mm m2
H.034 Pasang atap asbes gelombang (3.00 x 1.08 m) x 6 mm m2
H.035 Pasang atap asbes gelombang (2.70 x 1.08 m) x 6 mm m2
H.036 Pasang atap asbes gelombang (2.10 x 1.08 m) x 6 mm m2
H.037 Pasang atap asbes gelombang (1.80 x 1.08 m) x 6 mm m2
H.038 Pasang nok stel gelombang 0.92 m m1
H.039 Pasang nok stel gelombang 1.05 m m1
H.040 Pasang nok stel gelombang 1.08 m m1
H.041 Pasang nok paten 0.92 m m1
H.042 Pasang nok paten 1.05 m m1
H.043 Pasang nok paten 1.08 m m1
H.044 Pasang nok stel rata 0.92 m m1
H.045 Pasang nok stel rata 1.05 m m1
H.046 Pasang atap seng gelombang m2
H.047 Pasang bubung seng gelombang m1
H.048 Pasang Atap Aluminium m2
H.049 Pasang Bubung Atap Aluminium m2
H.050 Pasang Lapisan Aluminium Foil/Sesalation m2
H.051 Pasang rooftop m2
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
H.052 Pasang atap polycarbonat m2
H.053 Pasang Atap Seng Galvalum m2
H.054 Pasang Bubung Atap Seng Galvalum m2
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
I.007 Langit-langit akustik (60 x 120) cm m2
I.008 Langit-langit plywood (30 x 60) cm, tebal 4 mm m2
I.009 Langit-langit plywood (30 x 60) cm, tebal 6 mm m2
I.010 Langit-langit plywood (60 x 120) cm, tebal 4 mm m2
I.011 Langit-langit plywood (60 x 120) cm, tebal 6 mm m2
I.012 Langit-langit teakwood (30 x 60) cm, tebal 4 mm m2
I.013 Langit-langit teakwood (60 x 120) cm, tebal 4 mm m2
I.014 Langit-langit lat kayu jati m2
I.015 Langit-langit lat kayu kamper m2
I.016 Langit-langit soft board m2
I.017 Langit-langit akustik (60 x 120) cm + rangka aluminium m2
I.018 Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka kayu jati m2
I.019 Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka kayu kamper m2
I.020 Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka kayu borneo m2
I.021 Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka kayu kruing m2
I.022 Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka kayu meranti m2
I.023 Langit-langit plywood 4 mm + rangka kayu jati m2
I.024 Langit-langit plywood 4 mm + rangka kayu kamper m2
I.025 Langit-langit plywood 4 mm + rangka kayu borneo m2
I.026 Langit-langit plywood 4 mm + rangka kayu kruing m2
I.027 Langit-langit plywood 4 mm + rangka kayu meranti m2
I.028 Langit-langit akustik (30 x 60) cm + rangka kayu jati m2
I.029 Langit-langit akustik (30 x 60) cm + rangka kayu kamper m2
I.030 Langit-langit akustik (30 x 60) cm + rangka kayu borneo m2
I.031 Langit-langit akustik (30 x 60) cm + rangka kayu kruing m2
I.032 Langit-langit akustik (30 x 60) cm + rangka kayu meranti m2
I.033 Langit-langit akustik (30 x 30) cm + rangka kayu jati m2
I.034 Langit-langit akustik (30 x 30) cm + rangka kayu kamper m2
I.035 Langit-langit akustik (30 x 30) cm + rangka kayu borneo m2
I.036 Langit-langit akustik (30 x 30) cm + rangka kayu kruing m2
I.037 Langit-langit akustik (30 x 30) cm + rangka kayu meranti m2
I.038 Langit-langit gypsum board (120x240x9) mm, tebal 9 mm m2
I.039 Langit-langit tripleks (120 x 240) cm, tebal 3 mm m2
I.040 Langit-langit tripleks (120 x 240) cm, tebal 4 mm m2
I.041 Langit-langit lambriziring kayu jati, tebal 9 mm m2
I.042 Langit-langit lambriziring kayu kamper, tebal 9 mm m2
I.043 List langit-langit kayu profil m1
I.044 List langit-langit gypsum m1
X. PEKERJAAN SANITASI
J.001 Pasang kloset jongkok teraso bh
J.002 Pasang kloset jongkok porselin kw. A bh
J.003 Pasang kloset jongkok lux bh
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
J.004 Pasang kloset duduk porselin kw. A bh
J.005 Pasang kloset duduk lux bh
J.006 Pasang buah urinoir bh
J.007 Pasang wastafel kw. A bh
J.008 Pasang wastafel lux bh
J.009 Pasang tempat sabun keramik bh
J.010 Pasang bak mandi teraso volume 0.3 m3 bh
J.011 Pasang bak mandi fibreglass volume 0.3 m3 bh
J.012 Pasang bak mandi batu bata volume 0.3 m3 bh
J.013 Pasang badkip porselen bh
J.014 Pasang bak beton volume 1.0 m3 bh
J.015 Pasang pipa penyalur air limbah jenis pipa tanah, diameter 15 cm m1
J.016 Pasang pipa penyalur air limbah jenis pipa tanah, diameter 20 cm m1
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
J.017 Pasang pipa beton Ø 20 cm m1
J.018 Pasang pipa beton Ø 30 cm m1
J.019 Pasang pipa beton Ø 40 cm m1
J.020 Pasang pipa beton Ø 50 cm m1
J.021 Pasang pipa beton Ø 60 cm m1
J.022 Pasang pipa beton Ø 80 cm m1
J.023 Pasang pipa beton Ø 90 cm m1
J.024 Pasang pipa beton Ø 100 cm m1
J.025 Pasang pipa beton U Ø 20 cm m1
J.026 Pasang pipa beton U Ø 30 cm m1
J.027 Pasang bak kontrol pasangan batu bata (30 x 30 x 35) cm bh
J.028 Pasang bak kontrol pasangan batu bata (45 x 45 x 50) cm bh
J.029 Pasang bak kontrol pasangan batu bata (60 x 60 x 65) cm bh
J.030 Pasang pipa galvanis Ø 1/2" m1
J.031 Pasang pipa galvanis Ø 3/4" m1
J.032 Pasang pipa galvanis Ø 1" m1
J.033 Pasang pipa galvanis Ø 1 1/2" m1
J.034 Pasang pipa galvanis Ø 2" m1
J.035 Pasang pipa galvanis Ø 2 1/2" m1
J.036 Pasang pipa galvanis Ø 3" m1
J.037 Pasang pipa galvanis Ø 4" m1
J.038 Pasang pipa PVC tipe AW Ø 1/2" m1
J.039 Pasang pipa PVC tipe AW Ø 3/4" m1
J.040 Pasang pipa PVC tipe AW Ø 1" m1
J.041 Pasang pipa PVC tipe AW Ø 1 1/2" m1
J.042 Pasang pipa PVC tipe AW Ø 2" m1
J.043 Pasang pipa PVC tipe AW Ø 2.5" m1
J.044 Pasang pipa PVC tipe AW Ø 3" m1
J.045 Pasang pipa PVC tipe AW Ø 4" m1
J.046 Pasang pipa PVC tipe AW Ø 6" m1
J.047 Pasang pipa PVC tipe AW Ø 8" m1
J.048 Pasang pipa PVC tipe D Ø 1/2" m1
J.049 Pasang pipa PVC tipe D Ø 3/4" m1
J.050 Pasang pipa PVC tipe D Ø 1" m1
J.051 Pasang pipa PVC tipe D Ø 1 1/2" m1
J.052 Pasang pipa PVC tipe D Ø 2" m1
J.053 Pasang pipa PVC tipe D Ø 2.5" m1
J.054 Pasang pipa PVC tipe D Ø 3" m1
J.055 Pasang pipa PVC tipe D Ø 4" m1
J.056 Pasang pipa PVC tipe C Ø 1/2" m1
J.057 Pasang pipa PVC tipe C Ø 3/4" m1
J.058 Pasang pipa PVC tipe C Ø 1" m1
J.059 Pasang pipa PVC tipe C Ø 1 1/2" m1
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
J.060 Pasang pipa PVC tipe C Ø 2" m1
J.061 Pasang pipa PVC tipe C Ø 2.5" m1
J.062 Pasang pipa PVC tipe C Ø 3" m1
J.063 Pasang pipa PVC tipe C Ø 4" m1
J.064 Pasang bak cuci piring stainles steel bh
J.065 Pasang bak cuci piring teraso bh
J.066 Pasang kran Ø 1/2" bh
J.067 Pasang kran Ø 3/4" bh
J.068 Pasang Afor Stainless Steel bh
J.069 Pasang Afor Plastik bh
J.070 Pasang Kaca Wastafel m2
J.071 Pasang pipa screen PVC tipe AW Ø 3" m1
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
J.072 Pasang pipa screen PVC tipe AW Ø 4" m1
J.073 Pasang pipa beton bertulang RCP Ø 40 cm m1
J.074 Pasang pipa beton bertulang RCP Ø 50 cm m1
J.075 Pasang pipa beton bertulang RCP Ø 60 cm m1
J.076 Pasang pipa beton bertulang RCP Ø 80 cm m1
J.077 Pasang pipa beton bertulang RCP Ø 105 cm m1
J.078 Pasang Box Culvert Monolit 40 x 40 cm m1
J.079 Pasang Box Culvert Monolit 50 x 50 cm m1
J.080 Pasang Box Culvert Monolit 60 x 60 cm m1
J.081 Pasang Box Culvert Monolit 80 x 80 cm m1
J.082 Pasang Box Culvert Monolit 100 x 100 cm m1
J.083 Pasang Box U Beton Bertulang ukuran dalam 40 x 60 cm, tebal 5 cm (U 4 m1
J.084 Pasang Tutup Box U Beton Bertulang ukuran 50 x 60 cm, tebal 10 cm (Co m1
J.085 Pasang Tutup Box U Beton Bertulang ukuran 50 x 60 cm, tebal 8 cm (Cov m1
J.086 Pasang Box U Beton Bertulang ukuran dalam 50 x 60 cm, tebal 7,5 cm (U m1
J.087 Pasang Tutup Box U Beton Bertulang ukuran dalam 65 x 60 cm, tebal 12 m1
J.088 Pasang Tutup Box U Beton Bertulang ukuran dalam 65 x 60 cm, tebal 10 m1
J.089 Pasang Box U Beton Bertulang ukuran dalam 60 x 60 cm, tebal 7,5 cm (U m1
J.090 Pasang Tutup Box U Beton Bertulang ukuran 75 x 60 cm, tebal 12 cm (Co m1
J.091 Pasang Tutup Box U Beton Bertulang ukuran 75 x 60 cm, tebal 10 cm (Co m1
J.092 Pasang Box U Beton Bertulang ukuran dalam 60 x 70 cm, tebal 7,5 cm (U m1
J.093 Pasang Beton Bertulang ukuran dalam 60 x 80 cm, tebal 7,5 cm (U 60/80 m1
J.094 Pasang Beton Bertulang ukuran dalam 80 x 80 cm, tebal 7,5 cm (U 80/80 m1
J.095 Pasang Box U Beton Bertulang ukuran dalam 80 x 90 cm, tebal 7,5 cm (U m1
J.096 Pasang Tutup Box U Beton Bertulang ukuran 95 x 60 cm, tebal 15 cm (Co m1
J.097 Pasang Tutup Box U Beton Bertulang ukuran 95 x 60 cm, tebal 10 cm (Co m1
J.098 Pasang Box U Beton Bertulang ukuran dalam 100 x 100 cm, tebal 8,5 cm m1
J.099 Pasang Box U Beton Bertulang ukuran dalam 100 x 120 cm, tebal 8,5 cm m1
J.100 Pasang Tutup Box U Beton Bertulang ukuran 117 x 60 cm, tebal 17 cm (C m1
J.101 Pasang Tutup Box U Beton Bertulang ukuran 117 x 60 cm, tebal 10 cm ( m1
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
K.012 Pasang Kusen Alluminium Coklat m1
K.013 Pasang pintu Alluminium coklat strip lebar 8 cm m2
K.014 Pasang Pintu Kaca Rangka Aluminium Coklat m2
K.015 Pasang venetion blinds dan vertical blinds (tirai) m2
K.016 Pasang teralis besi (2 x 3) mm m2
K.017 Pasang kawat nyamuk m2
K.018 Pasang jendela nako & trails m2
K.019 Pasang pintu fiber KM Unit
K.020 Pasang talang datar, seng bjls 30 L = 0.60 m m1
K.021 Pasang talang datar, seng bjls 30 L = 0.90 m m1
K.022 Pasang talang miring, seng bjls 30 L = 0.60 m m1
K.023 Pasang talang miring, seng bjls 30 L = 0.90 m m1
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
K.024 Pasang talang tegak pipa PVC Ø 3" m1
K.025 Pasang talang tegak pipa PVC Ø 4" m1
K.026 Pasang talang 1/2 lingkaran D-15 cm bjls 30, L = 45 cm m1
K.027 Pasang pagar BRC tinggi 1 m m1
K.028 Pasang tiang pagar BRC Dia 2" tinggi 1 m m1
K.029 Pasang pintu pagar BRC tinggi 1 m m1
K.030 Pasang pagar besi m1
K.031 Pasang pintu pagar besi m1
K.032 Pasang Atap Baja Ringan untuk Penutup Atap Genteng m1
K.033 Pasang Atap Baja Ringan untuk Penutup Atap Asbes Gelombang m1
K.034 Pasang Rangka Plafon Metal Furing m2
K.035 Pasang sunscreen besi hollow m2
K.036 Pasang pagar besi hollow m2
K.037 Pasang Pintu pagar besi hollow m2
K.038 Pasang Besi Wiremesh diameter 6 ukuran lubang 15x15 cm (M6) m²
K.039 Pasang Tutup Avoor dari Cor Besi Tuang, 60x80 cm Unit
K.040 Pasang Tutup Bak Kontrol Cor Besi Tuang, 100x100 cm Unit
Pemasangan 1 m2
K.041 m2
reng baja ringan
K.042 : Pengerjaan 100 kg pekerjaan perakitan /100KG
: Pengerjaan per kg pekerjaan perakitan kg
: Pengerjaan 1 cm pengelasan dengan las listrik cm
XII. PEKERJAAN KUNCI DAN KACA
L.001 Pasang kunci tanam antik bh
L.002 Pasang kunci tanam biasa bh
L.003 Pasang kunci tanam kamar mandi bh
L.004 Pasang kunci silinder bh
L.005 Pasang kunci selot bh
L.006 Pasang kunci lemari bh
L.007 Pasang engsel pintu bh
L.008 Pasang engsel jendela bh
L.009 Pasang grendel pintu bh
L.010 Pasang grendel jendela bh
L.011 Pasang hak angin bh
L.012 Pasang spring knip bh
L.013 Pasang kait angin bh
L.014 Pasang door closer bh
L.015 Pasang pegangan pintu/door holder bh
L.016 Pasang door stop bh
L.017 Pasang rel pintu dorong bh
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
L.023 Pasang kaca buram, tebal 5 mm m2
L.024 Pasang kaca buram, tebal 8 mm m2
L.025 Pasang kaca buram, tebal 12 mm m2
L.026 Pasang kaca cermin, tebal 5 mm m2
L.027 Pasang kaca cermin, tebal 6 mm m2
L.028 Pasang kaca cermin, tebal 8 mm m2
L.029 Pasang kaca rayben, tebal 3 mm m2
L.030 Pasang kaca rayben, tebal 5 mm m2
L.031 Pasang kaca rayben, tebal 8 mm m2
L.032 Pasang kaca rayben, tebal 12 mm m2
L.033 Pasang kaca " wireglass", tebal 5 mm m2
L.034 Pasang kaca patri, tebal 5 mm m2
L.035 Pasang glass block bh
L.036 Pasang kaca painting glass m2
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
XIII. PEKERJAAN LANTAI DAN DINDING
M.001 Pasang lantai ubin pc abu-abu ukuran 40 x 40 cm m2
M.002 Pasang lantai ubin pc abu-abu ukuran 30 x 30 cm m2
M.003 Pasang lantai ubin pc abu-abu ukuran 20 x 20 cm m2
M.004 Pasang lantai ubin pc warna ukuran 40 x 40 cm m2
M.005 Pasang lantai ubin pc warna ukuran 30 x 30 cm m2
M.006 Pasang lantai ubin pc warna ukuran 20 x 20 cm m2
M.007 Pasang lantai ubin teraso ukuran 40 x 40 cm m2
M.008 Pasang lantai ubin teraso ukuran 30 x 30 cm m2
M.009 Pasang lantai ubin granito ukuran 40 x 40 cm m2
M.010 Pasang lantai ubin granito ukuran 30 x 30 cm m2
M.011 Pasang lantai ubin teralux kerang ukuran 40 x 40 cm m2
M.012 Pasang lantai ubin teralux kerang ukuran 30 x 30 cm m2
M.013 Pasang lantai ubin teralux marmer ukuran 60 x 60 cm m2
M.014 Pasang lantai ubin teralux marmer ukuran 40 x 40 cm m2
M.015 Pasang lantai ubin teralux marmer ukuran 30 x 30 cm m2
M.016 Pasang plint ubin pc abu-abu ukuran 15 x 20 cm m1
M.017 Pasang plint ubin pc abu-abu ukuran 10 x 30 cm m1
M.018 Pasang plint ubin pc abu-abu ukuran 10 x 40 cm m1
M.019 Pasang plint ubin pc warna ukuran 10 x 20 cm m1
M.020 Pasang plint ubin pc warna ukuran 10 x 30 cm m1
M.021 Pasang plint ubin pc warna ukuran 10 x 40 cm m1
M.022 Pasang plint ubin teraso ukuran 10 x 30 cm m1
M.023 Pasang plint ubin teraso ukuran 10 x 40 cm m1
M.024 Pasang plint ubin granito ukuran 10 x 40 cm m1
M.025 Pasang plint ubin granito ukuran 10 x 30 cm m1
M.026 Pasang teraso cor di tempat, tebal 3cm m2
M.027 Pasang lantai keramik artistik 10 x 20 cm m2
M.028 Pasang lantai keramik artistik 10 x 10 cm m2
M.029 Pasang lantai keramik artistik 5 x 20 cm m2
M.030 Pasang dinding keramik artistik 10 x 20 cm m2
M.031 Pasang dinding keramik artistik 5 x 20 cm m2
M.032 Pasang plint keramik artistik 10 x 20 cm m1
M.033 Pasang plint keramik artistik 10 x 10 cm m1
M.034 Pasang plint keramik artistik 5 x 20 cm m1
M.035 Pasang internal cove artistik (5 x 5 x 20) cm m2
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
M.042 Pasang lantai keramik ukuran 30 x 30 cm putih m2
M.043 Pasang lantai keramik ukuran 30 x 30 cm warna/motif m2
M.044 Pasang lantai keramik ukuran 40 x 40 cm putih m2
M.045 Pasang lantai homogeneus tile 60x60 m2
M.046 Pasang lantai marmer ukuran (100x100)cm m2
M.047 Pasang plint ubin keramik lantai ukuran 10 x 20 cm m1
M.048 Pasang plint ubin keramik lantai ukuran 10 x 30 cm m1
M.049 Pasang plint ubin keramik lantai ukuran 10 x 40 cm m1
M.050 Pasang dinding porselin ukuran 15 x 15 cm, putih m2
M.051 Pasang dinding porselin ukuran 11 x 11 cm, putih m2
M.052 Pasang dinding porselin ukuran 11 x 11 cm, warna m2
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
M.053 Pasang dinding porselin ukuran 15 x 15 cm, warna m2
M.054 Pasang dinding porselin ukuran 10 x 20 cm, warna m2
M.055 Pasang dinding porselin ukuran 20 x 20 cm, warna m2
M.056 Pasang dinding keramik ukuran 20 x 20 cm m2
M.057 Pasang dinding keramik ukuran 20 x 25 cm m2
M.058 Pasang dinding batu paras Jogja m2
M.059 Pasang lantai vinyl ukuran (30x30) cm Klas I m2
M.060 Pasang wallpaper m2
M.061 Pasang dinding batu palimanan m2
M.062 Pasang dinding batu granito m2
M.063 Pasang dinding marmer ukuran (100x100)cm m2
M.064 Pasang dinding batu teraso m2
M.065 Pasang paving stone (blok) segi empat biasa m2
M.066 Pasang paving stone (blok) segi empat warna m2
M.067 Pasang paving stone (blok) segi enam biasa m2
M.068 Pasang paving stone (blok) segi enam warna m2
M.069 Pasang paving stone (blok) tiga berlian berlian biasa m2
M.070 Pasang paving stone (blok) tiga berlian berlian warna m2
M.071 Pasang Batu Ampyangan Granit m2
M.072 Pasang lantai keramik 5 x 30 cm m2
M.073 Pasang lantai keramik 5 x 40 cm m2
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
N.021 Pengecatan plafon (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) m2
N.022 Pengecatan permukaan baja dengan meni besi m2
N.023 Pengecatan permukaan baja m2
N.024 Pengecatan permukaan baja dengan meni besi dan perancah m2
N.025 Pengecatan permukaan baja lapis seng (galbani) secara manual, 1 lapis m2
N.026 Pengecatan permukaan baja lapis seng (galbani) secara manual, 3 lapis m2
N.027 Pengecatan permukaan baja lapis seng (galbani) secara semprot, 1 lapis m2
N.028 Pekerjaan Waterproofing m2
N.029 Pengecatan Kerb m2
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
XVI. PEKERJAAN INSTALASI LISTRIK
P.001 Pemasangan Stop Kontak Titik
P.002 Pemasangan Saklar Tunggal Titik
P.003 Pemasangan Saklar Ganda Titik
P.004 Pemasangan titik lampu pijar 5 - 40 watt Titik
P.005 Pemasangan titik lampu pijar 50 - 100 watt Titik
P.006 Pemasangan titik lampu TL 20 Watt Titik
P.007 Pemasangan titik lampu TL 40 Watt Titik
P.008 Pemasangan titik lampu XL 5 Watt Titik
P.009 Pemasangan titik lampu XL 8 Watt Titik
P.010 Pemasangan titik lampu XL 14 Watt Titik
P.011 Pemasangan titik lampu XL 18 Watt Titik
P.012 Pemasangan titik lampu XL 23 Watt Titik
P.013 Pemasangan Sekering 1 Group Unit
P.014 Pemasangan Sekering 2 Group Unit
P.015 Pemasangan Sekering 3 Group Unit
P.016 Pemasangan Penangkal Petir Unit
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
Q.027 Pengadaan dan pemasangan pipa sounding SWL PVC-AW Ø 1" m1
Q.028 Pengisian gravel pack Ø 5 mm - 10 mm m3
Q.029 Beton Mortar 1 pc : 1 ps m3
Q.030 Pencucian sumur bor, kedalaman < 200 m Titik
Q.031 Pencucian sumur bor, kedalaman > 200 m Titik
Q.032 Pumping test dan test nonstop 24 jam Jam
Q.033 Pasang pipa PVC Moof 6 m S-12.5 Ø 2" m1
Q.034 Pasang pipa PVC Moof 6 m S-12.5 Ø 2,5" m1
Q.035 Pasang pipa PVC Moof 6 m S-12.5 Ø 3" m1
Q.036 Pasang pipa PVC Moof 6 m S-12.5 Ø 4" m1
Q.037 Pasang pipa PVC Moof 6 m S-12.5 Ø 6" m1
Q.038 Pasang pipa PVC Moof 6 m S-12.5 Ø 8" m1
Q.039 Pasang pipa Moof S-12.5 Ø 2" lintas jalan m1
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
Q.040 Pasang pipa Moof S-12.5 Ø 3" lintas jalan m1
Q.041 Pasang pipa Moof S-12.5 Ø 4" lintas jalan m1
Q.042 Pasang pompa air Unit
Q.043 Pasang tandon air PVC V = 0.5 m3 Unit
Q.044 Pasang tandon air PVC V = 1.0 m3 Unit
Q.045 Pasang tandon air stainless V = 0.5 m3 Unit
Q.046 Pasang tandon air stainless V = 1.0 m3 Unit
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
R.037 Pintu Kayu Rangka Besi Ukuran Lebar 1,2 m dan tinggi 1,4 m, Ulir Double bh
R.038 Pintu Kayu Rangka Besi Ukuran Lebar 1 m dan tinggi 2 m, Ulir Double bh
R.039 Pintu Kayu Rangka Besi Ukuran Lebar 1,4 m dan tinggi 2,5 m, Ulir Double bh
R.040 Pintu Kayu Rangka Besi Ukuran Lebar 1,6 m dan tinggi 2,5 m, Ulir Double bh
R.041 Pintu Kayu Rangka Besi Ukuran Lebar 1,8 m dan tinggi 2,5 m, Ulir Double bh
R.042 Pintu Kayu Rangka Besi Ukuran Lebar 2 m dan tinggi 2,5 m, Ulir Double bh
R.043 Pintu Air Elektromekanikal Ukuran Lebar 2 m dan tinggi 2,5 m, Ulir Doub bh
R.044 Pintu Air Elektromekanikal Ukuran Lebar 2,5 m dan tinggi 3,5 m, Ulir Do bh
R.045 Pintu Air Elektromekanikal Ukuran Lebar 3 m dan tinggi 3,5 m, Ulir Doub bh
R.046 Pintu Air Elektromekanikal Ukuran Lebar 3,5 m dan tinggi 4,5 m, Ulir Do bh
R.047 Ruang Kontrol Pintu Air bh
R.048 Kistdam Pasir/Tanah dibungkus karung plastik Bagor (sebesar karung ber bh
R.049 Kerangka kayu untuk Kistdam pasir/tanah ukuran 23 x 65 cm m3
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
R.050 Kerangka baja profil L.40.40.4 atau profil Union berlubang untuk kistdam m3
R.051 Pompa air diesel daya 5 kW dengan suction head max 3 m dan discharge bh/hari
R.052 Pompa air diesel daya 10 kW dengan suction head max 3 m dan discharg bh/hari
R.053 Pompa air diesel daya 20 kW dengan suction head max 3 m dan discharg bh/hari
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
S.040 Pasang Flange Gate Valve Ø 2" bh
S.041 Pasang Flange Gate Valve Ø 3" bh
S.042 Pasang Flange Gate Valve Ø 4" bh
S.043 Pasang Bend All Flange GI Ø 2" x 90 bh
S.044 Pasang Bend All Flange GI Ø 2" x 45 bh
S.045 Pasang Bend All Flange GI Ø 3" x 90 bh
S.046 Pasang Bend All Flange GI Ø 3" x 45 bh
S.047 Pasang Bend All Flange GI Ø 4" x 90 bh
S.048 Pasang Bend All Flange GI Ø 4" x 45 bh
S.049 Pasang Flange Socket Ø 2" Unit
S.050 Pasang Flange Socket Ø 3" m1
S.051 Pasang Flange Socket Ø 4" m1
S.052 Pasang Flange Spigot Ø 2" bh
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
S.053 Pasang Flange Spigot Ø 3" bh
S.054 Pasang Flange Spigot Ø 4" bh
S.055 Pasang Straatport Ø 2" Ls
S.056 Pasang Straatport Ø 3" m1
S.057 Pasang Straatport Ø 4" bh
S.058 Pasang Straatport Ø 6" bh
S.059 Pasang Dop PVC Ø 2" bh
S.060 Pasang Dop PVC Ø 3" bh
S.061 Pasang Dop PVC Ø 4" bh
S.062 Pasang Reducer PVC Moof 3" x 2" bh
S.063 Pasang Reducer PVC Moof 4" x 3" bh
S.064 Pasang Flange Check Valve Ø 2" bh
S.065 Pasang Flange Check Valve Ø 3" bh
S.066 Pasang Flange Air Valve Ø 1" bh
S.067 Pasang Flange Air Valve Ø 2" bh
S.068 Pasang Flange Water Meter Ø 2" bh
S.069 Pasang Flange Water Meter Ø 3" bh
S.070 Pasang Manometer 10 bar bh
S.071 Pasang Watermeter Ø 1/2" bh
S.072 Pasang Stopkran Ø 1/2" bh
S.073 Pasang Box Meter (plat tebal 1 mm) bh
S.074 Pasang Clamp Saddle Ø 2" x 1/2" bh
S.075 Pasang Knee GI Ø 1/2" bh
S.076 Pasang Tee GI Ø 1/2" bh
S.077 Pasang Double Neple Ø 1/2" bh
S.078 Pasang Kran Ø 1/2" bh
S.079 Pasang Double Neple GI Ø 2" bh
S.080 Pasang Double Neple GI Ø 3" bh
S.081 Pasang Double Neple GI Ø 4" bh
S.082 Pasang Flange Las Ø 2" bh
S.083 Pasang Flange Las Ø 3" bh
S.084 Pasang Flange Las Ø 4" bh
S.085 Pasang Flange Drat Ø 2" bh
S.086 Pasang Flange Drat Ø 3" bh
S.087 Pasang Flange Drat Ø 4" bh
S.088 Pasang Flange Buta Ø 2" bh
S.089 Pasang Flange Buta Ø 3" bh
S.090 Pasang Flange Buta Ø 4" bh
S.091 Pasang Sock Drat GI Ø 2" bh
S.092 Pasang Sock Drat GI Ø 3" bh
S.093 Pasang Sock Drat GI Ø 4" bh
S.094 Pasang Kenie Drat GI Ø 2" bh
S.095 Pasang Kenie Drat GI Ø 3" bh
S.096 Pasang Kenie Drat GI Ø 4" bh
S.097 Pasang Elbow Drat GI Ø 2" bh
S.098 Pasang Elbow Drat GI Ø 3" bh
S.099 Pasang Elbow Drat GI Ø 4" bh
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
S.100 Pasang Giboult Joint Ø 2" bh
S.101 Pasang Giboult Joint Ø 3" bh
S.102 Pasang Giboult Joint Ø 4" bh
S.103 Uji Coba Instalasi Pipa bh
S.104 Pasang Kabel Pompa NYYHY 3 x 6 mm bh
S.105 Pasang Kabel Pompa NYYHY 3 x 4 mm bh
S.106 Pasang Kabel Elektrode NYYHY 3 x 1.5 mm bh
S.107 Pasang Panel Pompa bh
S.108 Pasang Junction Box bh
S.109 Pasang Elektrode Pompa bh
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
T.01 Pembersihan dan striping/kosrekan m2
T.02 Tebas/tebang berupa memotong dan membersihkan lokasi dari tanaman m2
T.03 Cabut tunggul tanaman keras min. Dia. 15 cm dgn membuang sisa tungul per pohon
T.04 Uitset trase saluran pembawa dan pembuang m1
T.05 Pasang profil melintang galian tanah jarak 50 m pd ruas saluran yang lur m1
T.06 Pasang profil melintang galian tanah jarak 25 m pd ruas saluran tikungan m1
T.07a Galian tanah biasa pada saluran sedalam ≤ 1 m dan membuang hasil galian ke tempat
pembuangan dengan jarak angkut ≤ 3 m termasuk perataan dan perapih m3
T.07b Galian tanah biasa pada saluran sedalam > 1 m dan sampai dengan 2 m dan
membuang hasil galian ke tempat pembuangan dengan jarak angkut ≤ 3 m3
T.07c Mengangkut hasil galian ketempat pembuangan dengan jarak angkut > 3 m
sampai ≤ 10 m termasuk perataan dan perapihan m3
T.07d Mengangkut hasil galian ketempat pembuangan dengan jarak angkut > 10 m
sampai ≤ 50 m termasuk perataan dan perapihan m3
T.07e Mengangkut hasil galian ketempat pembuangan dengan jarak angkut setiap 100 m
termasuk perataan dan perapihan m3
T.08a Galian tanah keras dengan bantuan alat pemecah pada saluran sedalam ≤ 1 m dan
membuang hasil galian ke tempat pembuangan dengan jarak angkut ≤ 3 m termasuk
perataan dan perapihan m3
T.08b Galian tanah keras dengan bantuan alat pemecah pada saluran sedalam > 1 m
sampai dengan 2 m dan membuang hasil galian ke tempat pembuangan dengan
jarak angkut ≤ 3 m termasuk perataan dan perapihan m3
T.08c Mengangkut hasil galian ke tempat pembuangan dengan jarak angkut > 3 m
sampai ≤ 10 m termasuk perataan dan perapihan m3
T.08d Mengangkut hasil galian ke tempat pembuangan dengan jarak angkut > 10 m
sampai ≤ 50 m termasuk perataan dan perapihan m3
T.08e Mengangkut hasil galian ke tempat pembuangan dengan jarak angkut setiap 100 m
termasuk perataan dan perapihan m3
T.09a Galian tanah berbatu pada saluran sedalam ≤ 1 m dan membuang hasil galian ke
tempat pembuangan dengan jarak angkut ≤ 3 m termasuk perataan dan m3
T.09b Galian tanah berbatu pada saluran sedalam > 1 m sampai dengan 2 m dan
membuang hasil galian ke tempat pembuangan dengan jarak angkut ≤ 3 m
termasuk perataan dan perapihan m3
T.09c Mengangkut hasil galian ke tempat pembuangan dengan jarak angkut > 3 m
sampai ≤ 10 m termasuk perataan dan perapihan m3
T.09d Mengangkut hasil galian ke tempat pembuangan dengan jarak angkut > 10 m
sampai ≤ 50 m termasuk perataan dan perapihan m3
T.09e Mengangkut hasil galian ke tempat pembuangan dengan jarak angkut setiap
100 m termasuk perataan dan perapihan m3
T.10a Galian tanah lumpur pada saluran sedalam ≤ 1 m dan membuang hasil galian ke
tempat pembuangan dengan jarak angkut ≤ 3 m termasuk perataan dan m3
T.10b Galian tanah lumpur pada saluran sedalam > 1 m sampai dengan 2 m dan
membuang hasil galian ke tempat pembuangan dengan jarak angkut ≤ 3 m
termasuk perataan dan perapihan m3
T.10c Mengangkut hasil galian ke tempat pembuangan dengan jarak angkut > 3 m
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
sampai ≤ 10 m termasuk perataan dan perapihan m3
T.10d Mengangkut hasil galian ke tempat pembuangan dengan jarak angkut > 10 m
sampai ≤ 50 m termasuk perataan dan perapihan m3
T.10e Mengangkut hasil galian ke tempat pembuangan dengan jarak angkut setiap
100 m termasuk perataan dan perapihan m3
T.11a Galian tanah cadas dengan bantuan alat pemecah pada saluran sedalam ≤ 1 m dan
membuang hasil galian ke tempat pembuangan dengan jarak angkut ≤ 3 m termasuk
perataan dan perapihan m3
T.11b Galian tanah keras dengan bantuan alat pemecah pada saluran sedalam > 1 m
sampai dengan 2 m dan membuang hasil galian ke tempat pembuangan dengan
jarak angkut ≤ 3 m termasuk perataan dan perapihan m3
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
T.11c Mengangkut hasil galian ke tempat pembuangan dengan jarak angkut > 3 m
sampai ≤ 10 m termasuk perataan dan perapihan m3
T.11d Mengangkut hasil galian ke tempat pembuangan dengan jarak angkut > 10 m
sampai ≤ 50 m termasuk perataan dan perapihan m3
T.11e Mengangkut hasil galian ke tempat pembuangan dengan jarak angkut setiap 100 m
termasuk perataan dan perapihan m3
T.12 Galian pasir untuk pondasi bangunan sedalam ≤ 1 m dan membuang hasil galian
ke tempat pembuangan dengan jarak angkut ≤ 3 m termasuk perataan d m3
T.14a Timbunan tanah dengan bahan tanah telah tersedia di lokasi rencana timbunan
termasuk perataan dan perapian m3
T.14b Pemadatan tanah m3
T.14c Timbunan pasir sebagai bahan pengisi m3
T.14d Pemadatan pasir sebagai bahan pengisi m3
T.15 Timbunan tanah menggunakan buldoser m3
T.16 Galian tanah menggunakan exavator m3
T.17 Biaya operasional dump truck (mengangkut material tanah, jarak angkut -
T.18 Biaya operasional vibro roller -
T.19 Bor Crossing Jalan Ø 2" m'
T.20 Bor Crossing Jalan Ø 3" m'
T.21 Bor Crossing Jalan Ø 4" m'
T.22 Bor Crossing Jalan Ø 6" m'
T.23 Bor Crossing Jalan Ø 8" m'
T.24 Pengadaan dan Pemasangan Tiang Okt. Galv. H7 Cab 1 Unit
T.25 Pengadaan dan Pemasangan Tiang Okt. Galv. H7 Cab 2 Unit
T.26 Pengadaan dan Pemasangan Tiang Okt. Galv. H9 Cab 1 Unit
T.27 Pengadaan dan Pemasangan Tiang Okt. Galv. H9 Cab 2 Unit
T.28 Pengadaan dan Pemasangan Tiang Ornament P 3 m Unit
T.29 Pengadaan dan Pemasangan Tiang Ornament P 6 m Unit
T.30 Pengadaan dan Pemasangan Lampu PJU Spark Led SPL 48 55 Watt m'
T.31 Pengadaan dan Penarikan Kabel Udara Twisted 3x25 + 25 mm2 m'
T.32 Pengadaan dan Penarikan Kabel Tanah NYM 4 x 6mm2 m'
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
Malang,
KEPALA DINAS KEBERSIHAN DAN PERTAMANAN
KOTA MALANG
Rekap Analisa
ANALISA HARGA SATUAN PEKERJAAN (RAHSP)
AS KEBERSIHAN DAN PERTAMANAN
TAHUN ANGGARAN 2018
HARGA
SATUAN
(Rp.)
4
841,605.60
959,915.00
828,795.00
41,011.30
68,172.50
###
###
###
16,225.00
###
499,331.25
145,509.10
###
669,152.00
627,902.00
109,725.00
20,075.00
26,543.00
73,562.50
90,337.50
107,387.50
97,900.00
148,500.00
118,387.50
5,362.50
32,230.00
53,625.00
53,625.00
425,425.00
660,873.35
777,769.26
21,105.00
191,812.50
191,812.50
177,627.67
187,580.92
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
466,761.36
59,104.29
42,993.14
909,975.00
857,175.00
820,545.00
794,805.00
759,495.00
876,975.99
940,743.31
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
889,553.36
440,814.00
###
###
###
###
###
###
62,106.00
61,611.00
64,251.00
62,601.00
60,967.50
84,244.60
81,195.40
79,057.00
505,120.00
274,230.00
124,938.00
250,552.50
246,345.00
117,925.50
272,058.79
131,835.00
124,938.00
121,192.50
118,849.50
117,925.50
115,252.50
138,596.21
130,830.55
125,938.76
213,625.50
205,078.50
178,062.50
171,627.50
178,009.86
173,802.36
450,037.50
446,077.50
149,550.00
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
###
118,140.00
78,546.60
71,154.60
68,105.40
65,901.00
64,818.60
63,881.40
63,419.40
62,957.40
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
69,315.74
70,624.24
71,594.52
69,478.63
95,257.80
76,864.70
88,143.00
86,809.80
85,450.20
94,309.52
40,459.10
60,005.00
228,409.50
153,664.50
50,935.50
62,106.00
60,005.00
37,152.50
###
###
###
###
859,714.68
712,714.64
676,282.20
479,964.76
###
995,194.64
958,762.20
762,444.76
770,071.81
681,871.78
660,012.32
542,221.86
###
###
###
960,894.62
859,361.80
767,486.78
744,716.50
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
622,018.10
###
###
###
822,907.14
901,552.30
809,677.28
786,907.00
664,208.60
967,530.30
875,655.28
852,885.00
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
730,186.60
970,511.30
879,411.50
756,713.10
###
###
###
###
###
###
###
###
###
396,313.27
262,959.84
245,787.56
180,762.31
211,567.32
396,313.27
262,959.84
245,787.56
180,762.31
211,567.32
427,844.75
282,804.83
264,538.56
193,992.29
223,573.53
317,319.57
215,246.51
200,165.13
149,555.85
191,631.00
329,746.83
234,478.64
220,402.69
173,167.36
212,437.50
225,082.41
182,084.89
175,555.64
131,480.13
54,807.50
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
227,809.91
187,384.90
177,365.98
132,474.25
123,378.68
556,599.69
391,959.83
357,792.16
275,511.19
662,841.87
498,202.01
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
464,034.34
381,753.37
681,398.21
516,758.35
482,590.68
400,309.71
383,641.54
357,916.54
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
51,831.45
87,677.70
101,182.40
84,026.25
129,145.50
20,537.55
412.50
262.83
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
engangkut/menaikkan tulangan setiap kenaikan 4 m vertikal
262.83
39,293.79
39,680.30
340,439.00
210,331.00
372,064.00
226,143.50
500,611.65
301,216.58
504,707.28
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
303,264.39
627,331.65
364,576.58
510,099.70
305,960.60
436,228.65
269,025.08
82,764.04
###
###
###
###
###
###
###
94,814.50
119,233.95
119,233.95
###
40,150.00
60,225.00
80,300.00
80,678.68
80,300.00
311,960.00
121,574.53
440,555.50
###
###
399,492.50
651,590.50
261,035.50
787,938.46
565,482.50
723,112.50
451,005.50
###
###
454,355.00
677,715.50
356,078.25
787,938.46
581,221.00
723,112.50
486,535.50
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
###
###
461,670.00
688,165.50
361,303.25
850,115.96
654,307.50
825,000.00
488,625.50
###
###
465,327.50
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
693,390.50
363,915.75
853,773.46
659,532.50
845,377.50
352,550.00
272,228.00
388,740.00
292,908.00
311,767.50
261,962.25
###
321,332.00
###
342,012.00
###
689,480.00
584,540.00
421,520.00
###
272,228.00
###
292,908.00
###
887,480.00
584,540.00
421,520.00
###
915,728.00
###
936,408.00
###
222,362.25
###
915,728.00
###
936,408.00
###
222,362.25
###
915,728.00
###
936,408.00
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
###
###
11,740.50
248,077.50
64,798.25
87,898.25
76,623.25
139,048.25
275,495.00
99,000.00
237,820.00
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
113,300.00
126,995.00
88,448.25
88,448.25
89,694.00
90,277.00
152,665.15
164,045.64
167,651.00
109,120.00
129,965.00
122,947.00
123,772.00
192,093.77
183,570.20
114,102.08
69,902.25
73,198.62
72,264.61
72,937.59
68,624.05
90,141.15
92,007.85
83,922.30
80,241.15
143,155.65
86,279.27
78,856.03
75,022.53
156,714.25
152,325.25
150,095.55
86,226.25
89,249.05
90,819.85
85,300.05
80,121.25
84,550.40
51,239.10
222,796.75
258,874.00
61,598.35
123,768.15
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
352,633.05
229,287.85
262,583.20
34,661.00
34,661.00
34,661.00
33,221.10
231,462.00
203,727.70
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
83,451.50
76,255.30
103,880.70
62,843.00
75,003.50
87,611.70
72,116.00
516,499.81
413,599.74
94,600.00
341,291.50
285,918.47
211,683.52
200,715.24
163,908.49
194,508.60
515,454.25
373,170.59
352,148.06
281,601.79
340,252.00
655,194.95
512,911.29
491,888.76
421,342.49
479,992.70
752,831.45
585,802.81
561,124.19
478,309.01
561,124.19
43,323.50
47,295.88
57,723.88
433,142.38
368,829.84
39,806.25
25,650.90
394,636.00
658,944.00
836,506.00
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
656,821.00
###
###
###
###
55,137.50
489,467.00
976,523.40
###
###
###
203,244.25
269,601.20
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
123,022.90
210,289.20
257,902.70
306,097.00
365,205.50
559,398.40
610,351.50
729,234.00
109,120.00
238,694.50
367,017.75
526,476.50
789,552.50
112,860.00
140,302.80
183,961.80
235,120.05
377,991.90
515,384.10
552,984.30
743,271.65
64,130.00
33,256.08
40,312.80
50,577.12
136,200.90
80,917.65
335,788.75
476,566.75
285,325.98
385,722.51
18,964.44
23,294.70
27,054.72
35,234.10
41,624.55
57,662.55
88,282.70
101,291.30
16,950.78
20,122.74
23,116.50
27,304.20
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
41,535.45
48,467.43
62,425.88
72,921.86
498,836.25
400,402.75
87,071.60
68,481.60
77,555.50
62,837.50
271,048.53
350,856.69
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
491,634.69
441,402.50
695,556.40
823,489.33
###
###
###
###
###
###
###
771,732.50
382,940.25
279,485.25
911,652.50
556,927.25
415,852.25
943,983.33
646,280.25
481,687.25
###
###
###
###
###
###
###
###
###
###
25,212.00
24,747.25
27,481.30
18,126.35
24,863.85
###
7,420.43
###
###
469,249.00
###
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
106,811.10
68,871.00
342,862.30
688,693.50
629,717.12
164,655.74
453,585.00
###
253,385.00
296,931.80
274,917.50
296,931.80
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
95,413.45
99,293.70
85,761.50
429,678.70
352,051.70
208,740.40
720,625.07
762,542.60
410,968.28
374,770.17
49,570.31
455,758.55
#DIV/0!
#DIV/0!
41,257.97
###
###
172,466.25
135,861.00
1,358.61
5,307.28
187,016.50
712,222.50
819,018.75
232,453.38
188,875.50
###
89,175.63
73,383.75
107,483.75
###
51,672.50
35,990.63
24,026.75
273,231.75
223,987.50
58,874.75
370,760.50
125,474.53
124,782.63
358,581.03
###
162,849.78
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
229,484.48
291,411.45
475,900.15
269,646.03
339,874.43
458,500.35
186,047.13
248,785.63
492,888.55
775,665.55
807,430.53
###
50,914.33
738,521.03
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
92,851.11
102,316.39
119,075.00
103,549.27
108,572.09
127,627.50
109,821.25
121,367.95
434,724.40
422,070.66
422,107.51
608,394.05
341,063.80
502,219.30
842,767.20
43,219.00
37,359.74
34,633.50
41,969.40
32,166.20
31,883.50
41,291.25
38,879.50
46,458.50
69,675.98
66,833.71
734,618.50
###
###
759,330.00
###
140,423.80
258,330.60
138,948.70
323,998.40
465,303.85
457,680.85
186,186.00
211,585.00
204,682.50
214,791.50
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
211,548.59
234,920.62
215,050.00
289,440.00
675,789.84
81,191.00
137,606.15
104,081.45
238,645.00
276,947.00
307,219.00
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
238,645.00
236,379.00
236,912.50
265,188.00
274,078.75
379,483.50
424,015.35
86,984.15
245,101.45
172,671.40
769,427.34
146,071.75
212,711.95
167,750.00
168,025.00
171,105.00
149,831.00
157,454.00
251,303.25
255,616.67
279,450.00
15,896.65
16,616.05
16,616.05
16,616.05
###
43,365.63
210,763.30
247,207.40
233,255.55
19,919.02
235,131.05
24,319.90
66,863.50
27,812.95
54,230.66
59,201.34
16,132.05
8,954.55
40,608.15
26,251.50
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
27,744.20
32,077.10
35,841.85
77,001.54
38,412.00
220,493.68
183,559.20
51,530.60
38,160.00
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
229,577.70
191,902.70
232,877.70
218,570.00
232,001.00
412,434.00
265,848.00
233,464.00
233,904.00
246,444.00
243,067.00
246,158.00
194,414.00
315,210.50
442,057.00
###
###
###
347,247.67
434,059.58
520,871.50
651,089.38
868,119.17
###
###
###
18,372.52
###
289,373.06
347,247.67
434,059.58
578,746.11
744,102.14
###
###
538,945.00
538,945.00
592,977.00
479,644.00
479,644.00
516,747.00
69,245.00
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
47,465.00
715,043.78
###
###
###
337,537.33
62,617.50
80,991.90
120,705.20
166,067.00
334,949.73
550,866.39
#REF!
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
#REF!
#REF!
###
979,050.49
###
###
###
939,725.05
###
167,054.80
136,532.00
208,884.06
94,160.00
108,663.50
165,401.50
165,275.00
146,586.93
160,325.93
71,142.50
26,201.45
69,357.20
153,699.70
221,587.85
839,602.50
60,934.50
58,067.90
###
###
###
456,296.50
20,537.55
12,914.55
566,341.47
###
###
###
###
###
###
787,961.78
###
###
###
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
###
###
###
###
###
###
###
###
###
###
###
43,173.24
768,102.50
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
###
729,487.00
934,577.60
###
44,517.00
41,547.00
51,073.00
289,542.00
406,868.00
42,856.00
###
23,754.50
105.44
948.75
374.83
201.30
414.48
537,229.00
134,733.50
19,609.70
182,440.50
12,502.05
314,439.95
###
###
349,126.25
450,117.25
397,372.25
515,242.75
558,192.25
732,327.75
110,742.50
104,472.50
175,950.50
159,857.50
244,920.50
217,332.50
99,291.50
145,370.50
167,315.50
211,205.50
241,928.50
255,095.50
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
930,930.00
###
###
293,832.00
278,157.00
438,570.00
354,442.00
499,070.00
438,669.00
194,777.00
254,551.00
337,315.00
176,385.00
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
236,159.00
291,335.00
99,363.00
117,337.00
161,854.00
218,284.00
24,585.69
36,080.69
57,508.69
118,415.00
166,694.00
###
###
500,148.00
###
###
###
257,950.00
157,556.00
41,176.00
108,013.50
29,163.50
8,307.25
9,637.25
7,737.25
31,206.00
55,539.50
132,519.25
170,929.00
86,795.20
96,047.76
121,582.89
94,268.50
102,659.50
137,261.50
96,305.00
146,185.00
173,495.00
26,547.25
65,578.25
101,550.25
45,884.36
111,035.36
157,847.36
55,574.36
126,335.36
158,607.36
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
138,825.00
175,405.00
299,495.00
###
67,468.50
24,623.50
16,225.69
###
580,800.00
100,485.00
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
2,860.00
4,559.50
4,255.63
158,177.89
220,749.10
363,123.20
saluran sedalam ≤ 1 m dan membuang hasil galian ke tempat
61,446.00
73,700.00
24,288.00
70,620.00
ketempat pembuangan dengan jarak angkut setiap 100 m
125,125.00
an bantuan alat pemecah pada saluran sedalam ≤ 1 m dan
ke tempat pembuangan dengan jarak angkut ≤ 3 m termasuk
94,239.96
102,830.96
32,230.00
32,230.00
ke tempat pembuangan dengan jarak angkut setiap 100 m
125,125.00
da saluran sedalam ≤ 1 m dan membuang hasil galian ke
147,367.00
147,367.00
32,230.00
55,121.00
125,125.00
98,461.00
128,023.50
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
32,230.00
55,121.00
125,125.00
an bantuan alat pemecah pada saluran sedalam ≤ 1 m dan
ke tempat pembuangan dengan jarak angkut ≤ 3 m termasuk
160,030.96
165,244.96
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
32,230.00
55,121.00
ke tempat pembuangan dengan jarak angkut setiap 100 m
125,125.00
si bangunan sedalam ≤ 1 m dan membuang hasil galian
77,946.00
45,422.84
66,542.84
443,300.00
37,660.68
###
###
###
###
247,031.25
315,656.25
426,562.50
639,843.75
853,125.00
###
###
###
###
620,427.75
827,047.75
###
173,623.81
106,949.68
41,085.00
45,523.76
72,336.26
50,187.50
23,210.00
24,750.00
23,210.00
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
Malang,
KEPALA DINAS KEBERSIHAN DAN PERTAMANAN
Rekap Analisa
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
B
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
B
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
B
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
B
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
B
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
C
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
C
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
C
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
D
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
D
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
D
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
D
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
D
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
D
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
DD
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
DD
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
DD
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
E
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
E
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
E
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
E
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
F
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
G
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
G
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
G
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
G
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
G
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
G
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
G
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
G
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
G
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
G
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
G
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
G
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
G
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
G
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
G
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
G
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
G
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
G
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
GG
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
GG
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
GG
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
GG
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
GGG
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
GGG
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
GGG
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
GGG
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
GGG
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
GGG
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
GGG
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
GGG
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
GGG
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
GGG
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
GGG
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
GGG
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
GGG
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
GGG
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
GGG
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
GGG
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
GGGG
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
GGGG
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
GGGG
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
GGGG
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
GGGG
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
GGGG
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
GGGG
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
GGGG
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
GGGG
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
GGGG
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
GGGG
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
GGGG
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
GGGG
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
GGGG
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
GGGG
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
GGGG
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
GGGG
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
GGGG
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
GGGG
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
GGGG
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
GGGG
ANALISA HARGA SATUAN
A.
H
ANALISA HARGA SATUAN
A.
H
ANALISA HARGA SATUAN
A.
H
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
I
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
I
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
I
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
1 Kloset Duduk (setara INA) warna M233 Unit 1.0000 747,700.00 747,700.00
2 Perlengkapan 0.0600 44,862.00 2,691.72
C PERALATAN
J
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
J
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
J
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
J
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
J
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
J
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
J
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
J
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
J
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
J
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
J
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
J
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
J
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
J
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
K
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
K
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
K
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
K
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
K
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
K
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
K
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
K
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
K
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
K
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) per Luas 5.76 285,525.00
E JUMLAH HARGA per 1 m2 49,570.31
K
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) per Luas 0.93 426,590.00
E JUMLAH HARGA per 1 m2 455,758.55
K
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
K
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
1 Mesin Las Listrik 250 A, Diesel E59 jam 0.8 114,000.00 91,200.00
K
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
1 Mesin Las Listrik 250 A, Diesel E59 jam 0.008 114,000.00 912.00
K
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
1 Mesin Las Listrik 250 A, Diesel E59 jam 0.17 114,000.00 19,380.00
K
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
1 Mesin Las Listrik 250 A, Diesel E59 jam 0.017 114,000.00 1,938.00
K
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
K
:
ANALISA HARGA SATUAN
Pem
asan
KODE ANALISA : A.4.2.1.18.-b
gan
JENIS PEKERJAAN 1 m2
SATUAN PEMBAYARAN :usuk
m2
baja
ringa
n
PERKIRAAN HARGA JUMLAH
NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A. TENAGA
B BAHAN
C PERALATAN
K
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
L
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
L
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
L
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
L
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
L
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
L
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
L
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
L
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
L
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
L
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
L
Kusen Pintu Jendela
E.22 PK 1 set
1 Pemasangan Kusen Alumunium Profil 4" Brown 13.00 m
2 Pemasangan Slimar Alumunium Profil 3/8 " - m
3 Pemasangan Daun Pintu WPC - unit
4 Pemasangan Engsel Kuningan Untuk Pintu 2.00 set
5 Pemasangan Kunci Tanam Besar 2x Putar kuningan 1.00 unit
6 Pemasangan Grendel Tanam - unit
7 Pemasangan Kaca Mati tebal 5 mm - m2
8 Pasang Kaca Temperred, Tebal 12 mm 4.43 m2
9 Pasang Kaca polos, Tebal 8 mm 1.69 m2
10 Floor Hinge pintu kaca tempered 2.00 set
11 Handle pintu kaca tempered 2.00 set
12 Kunci Pintu Kaca Tempered 2.00 set
13 Beton K-225 0.63 m3
14 Beksiting 8.46 m2
E.24 PG 1 set
1 Pemasangan Kusen Alumunium Profil 4" Brown 5.30 m
2 Pemasangan Slimar Alumunium Profil 3/8 " - m
3 Pemasangan Daun Pintu WPC 1.00 unit
4 Pemasangan Engsel Kuningan Untuk Pintu 1.00 set
5 Pemasangan Kunci Tanam Besar 2x Putar kuningan 1.00 unit
6 Pemasangan Grendel Tanam - unit
7 Pemasangan Kaca Mati tebal 5 mm - m2
8 Pasang Kaca Temperred, Tebal 12 mm - m2
9 Floor Hinge pintu kaca tempered - set
10 Handle pintu kaca tempered - set
11 Handle pintu geser 1.00 set
12 Rel pintu + assesoris 1.00 set
13 Floor guide 1.00 set
E.14 BV2 1
1 Pemasangan Kusen Alumunium Profil 4" Brown 4.80 m
2 Pemasangan Slimar Alumunium Profil 3/8 " - m
3 Pemasangan Daun Pintu WPC - unit
4 Pemasangan Engsel Kuningan Untuk Pintu - set
5 Pasang Casement - set
6 Pemasangan Kunci Tanam Besar 2x Putar kuningan - unit
7 Pemasangan Grendel Tanam - unit
8 Pemasangan Kaca Mati tebal 5 mm 0.73 m2
9 Floor Hinge pintu kaca tempered - set
10 Handle pintu kaca tempered - set
11 Kunci Pintu Kaca Tempered - set
E.14 BV2A 1
1 Pemasangan Kusen Alumunium Profil 4" Brown 4.50 m
2 Pemasangan Slimar Alumunium Profil 3/8 " 4.00 m
3 Pemasangan Daun Pintu WPC - unit
4 Pemasangan Engsel Kuningan Untuk Pintu 2.00 set
5 Pasang Casement 2.00 set
6 Pemasangan Kunci Tanam Besar 2x Putar kuningan - unit
7 Pemasangan Grendel Tanam 2.00 unit
8 Pemasangan Kaca Mati tebal 5 mm 0.73 m2
9 Floor Hinge pintu kaca tempered - set
10 Handle pintu kaca tempered - set
11 Kunci Pintu Kaca Tempered - set
E.14 BV2B 1
1 Pemasangan Kusen Alumunium Profil 4" Brown 4.65 m
2 Pemasangan Slimar Alumunium Profil 3/8 " - m
3 Pemasangan Daun Pintu WPC - unit
4 Pemasangan Engsel Kuningan Untuk Pintu - set
5 Pasang Casement - set
6 Pemasangan Kunci Tanam Besar 2x Putar kuningan - unit
7 Pemasangan Grendel Tanam - unit
8 Pemasangan Kaca Mati tebal 5 mm 0.77 m2
9 Floor Hinge pintu kaca tempered - set
10 Handle pintu kaca tempered - set
11 Kunci Pintu Kaca Tempered - set
1
Rp 19,166,728.11
Rp 106,811.10 Rp 1,388,544.30
Rp 68,871.00 Rp -
Rp 1,666,237.50 Rp -
Rp 81,068.75 Rp 162,137.50
Rp 712,222.50 Rp 712,222.50
Rp 97,712.50 Rp -
Rp 124,782.63 Rp -
Rp 1,832,675.63 Rp 8,112,888.46
Rp 291,411.45 Rp 492,485.35
Rp 1,430,783.75 Rp 2,861,567.50
Rp 203,625.00 Rp 407,250.00
Rp 825,522.50 Rp 1,651,045.00
Rp 1,308,582.00 Rp 830,295.28
Rp 301,216.58 Rp 2,548,292.22
Rp 19,166,728.11
unit Rp 19,166,728.11
Rp 5,393,174.74
Rp 106,811.10 Rp 993,343.23
Rp 68,871.00 Rp -
Rp 1,666,237.50 Rp 3,332,475.00
Rp 81,068.75 Rp 162,137.50
Rp 712,222.50 Rp 712,222.50
Rp 97,712.50 Rp 97,712.50
Rp 124,782.63 Rp 95,284.01
Rp 1,832,675.63 Rp -
Rp 1,430,783.75 Rp -
Rp 203,625.00 Rp -
Rp 825,522.50 Rp -
Rp 5,393,174.74
unit Rp 5,393,174.74
Rp 4,349,088.17
Rp 106,811.10 Rp 903,621.91
Rp 68,871.00 Rp -
Rp 1,666,237.50 Rp 2,499,356.25
Rp 81,068.75 Rp 162,137.50
Rp 712,222.50 Rp 712,222.50
Rp 97,712.50 Rp -
Rp 124,782.63 Rp 71,750.01
Rp 1,832,675.63 Rp -
Rp 1,430,783.75 Rp -
Rp 203,625.00 Rp -
Rp 825,522.50 Rp -
Rp 4,349,088.17
unit Rp 4,349,088.17
Rp 3,263,807.57
Rp 106,811.10 Rp 758,358.81
Rp 68,871.00 Rp -
Rp 1,666,237.50 Rp 1,666,237.50
Rp 81,068.75 Rp 81,068.75
Rp 712,222.50 Rp 712,222.50
Rp 97,712.50 Rp -
Rp 124,782.63 Rp 45,920.01
Rp 1,832,675.63 Rp -
Rp 1,430,783.75 Rp -
Rp 203,625.00 Rp -
Rp 825,522.50 Rp -
Rp 3,263,807.57
unit Rp 3,263,807.57
Rp 3,025,627.58
Rp 106,811.10 Rp 566,098.83
Rp 68,871.00 Rp -
Rp 1,666,237.50 Rp 1,666,237.50
Rp 81,068.75 Rp 81,068.75
Rp 712,222.50 Rp 712,222.50
Rp 97,712.50 Rp -
Rp 124,782.63 Rp -
Rp 1,832,675.63 Rp -
Rp 1,430,783.75 Rp -
Rp 203,625.00 Rp -
Rp 825,522.50 Rp -
Rp 3,025,627.58
unit Rp 3,025,627.58
Rp 4,268,202.58
Rp 106,811.10 Rp 566,098.83
Rp 68,871.00 Rp -
Rp 1,666,237.50 Rp 1,666,237.50
Rp 81,068.75 Rp 81,068.75
Rp 712,222.50 Rp 712,222.50
Rp 97,712.50 Rp -
Rp 124,782.63 Rp -
Rp 1,832,675.63 Rp -
Rp 1,430,783.75 Rp -
Rp 203,625.00 Rp -
Rp 96,975.00 Rp 96,975.00
Rp 1,053,625.00 Rp 1,053,625.00
Rp 91,975.00 Rp 91,975.00
Rp 4,268,202.58
unit Rp 4,268,202.58
Rp 1,410,980.26
Rp 106,811.10 Rp 736,996.59
Rp 68,871.00 Rp -
Rp 549,241.00 Rp 549,241.00
Rp 81,068.75 Rp 81,068.75
Rp 712,222.50 Rp -
Rp 97,712.50 Rp -
Rp 124,782.63 Rp 43,673.92
Rp 1,832,675.63 Rp -
Rp 1,430,783.75 Rp -
Rp 203,625.00 Rp -
Rp 825,522.50 Rp -
Rp 1,410,980.26
unit Rp 1,410,980.26
Rp 1,669,123.53
Rp 106,811.10 Rp 736,996.59
Rp 68,871.00 Rp -
Rp 549,241.00 Rp 807,384.27
Rp 81,068.75 Rp 81,068.75
Rp 712,222.50 Rp -
Rp 97,712.50 Rp -
Rp 124,782.63 Rp 43,673.92
Rp 1,832,675.63 Rp -
Rp 1,430,783.75 Rp -
Rp 203,625.00 Rp -
Rp 825,522.50 Rp -
Rp 1,669,123.53
unit Rp 1,669,123.53
Rp 1,443,870.74
Rp 106,811.10 Rp 555,417.72
Rp 68,871.00 Rp -
Rp 549,241.00 Rp 807,384.27
Rp 81,068.75 Rp 81,068.75
Rp 712,222.50 Rp -
Rp 97,712.50 Rp -
Rp 124,782.63 Rp -
Rp 1,832,675.63 Rp -
Rp 1,430,783.75 Rp -
Rp 203,625.00 Rp -
Rp 825,522.50 Rp -
Rp 1,443,870.74
unit Rp 1,443,870.74
Rp 1,355,697.00
Rp 106,811.10 Rp 630,185.49
Rp 68,871.00 Rp 254,822.70
Rp 1,666,237.50 Rp -
Rp 81,068.75 Rp 81,068.75
Rp 73,383.75 Rp 73,383.75
Rp 712,222.50 Rp -
Rp 97,712.50 Rp 97,712.50
Rp 124,782.63 Rp 40,180.01
Rp 291,411.45 Rp 178,343.81
Rp 1,430,783.75 Rp -
Rp 203,625.00 Rp -
Rp 825,522.50 Rp -
Rp 1,355,697.00
unit Rp 1,355,697.00
Rp 2,380,279.60
Rp 106,811.10 Rp 929,256.57
Rp 68,871.00 Rp 509,645.40
Rp 1,666,237.50 Rp -
Rp 81,068.75 Rp 162,137.50
Rp 73,383.75 Rp 146,767.50
Rp 712,222.50 Rp -
Rp 97,712.50 Rp 195,425.00
Rp 124,782.63 Rp 80,360.01
Rp 291,411.45 Rp 356,687.61
Rp 1,430,783.75 Rp -
Rp 203,625.00 Rp -
Rp 825,522.50 Rp -
Rp 2,380,279.60
unit Rp 2,380,279.60
Rp 3,629,165.50
Rp 106,811.10 Rp 1,452,630.96
Rp 68,871.00 Rp 764,468.10
Rp 1,666,237.50 Rp -
Rp 81,068.75 Rp 243,206.25
Rp 73,383.75 Rp 220,151.25
Rp 712,222.50 Rp -
Rp 97,712.50 Rp 293,137.50
Rp 124,782.63 Rp 120,540.02
Rp 291,411.45 Rp 535,031.42
Rp 1,430,783.75 Rp -
Rp 203,625.00 Rp -
Rp 825,522.50 Rp -
Rp 3,629,165.50
unit Rp 3,629,165.50
Rp 2,063,190.92
Rp 106,811.10 Rp 715,634.37
Rp 68,871.00 Rp 556,477.68
Rp 1,666,237.50 Rp -
Rp 81,068.75 Rp 162,137.50
Rp 73,383.75 Rp 146,767.50
Rp 712,222.50 Rp -
Rp 97,712.50 Rp 195,425.00
Rp 291,411.45 Rp 286,748.87
Rp 1,430,783.75 Rp -
Rp 203,625.00 Rp -
Rp 825,522.50 Rp -
Rp 2,063,190.92
unit Rp 603,535.03
Rp 106,811.10 Rp 512,693.28
Rp 68,871.00 Rp -
Rp 1,666,237.50 Rp -
Rp 81,068.75 Rp -
Rp 73,383.75 Rp -
Rp 712,222.50 Rp -
Rp 97,712.50 Rp -
Rp 124,782.63 Rp 90,841.75
Rp 1,430,783.75 Rp -
Rp 203,625.00 Rp -
Rp 825,522.50 Rp -
Rp 603,535.03
unit Rp 603,535.03
unit Rp 1,351,305.70
Rp 106,811.10 Rp 480,649.95
Rp 68,871.00 Rp 275,484.00
Rp 1,666,237.50 Rp -
Rp 81,068.75 Rp 162,137.50
Rp 73,383.75 Rp 146,767.50
Rp 712,222.50 Rp -
Rp 97,712.50 Rp 195,425.00
Rp 124,782.63 Rp 90,841.75
Rp 1,430,783.75 Rp -
Rp 203,625.00 Rp -
Rp 825,522.50 Rp -
Rp 1,351,305.70
unit Rp 1,351,305.70
unit Rp 592,754.24
Rp 106,811.10 Rp 496,671.62
Rp 68,871.00 Rp -
Rp 1,666,237.50 Rp -
Rp 81,068.75 Rp -
Rp 73,383.75 Rp -
Rp 712,222.50 Rp -
Rp 97,712.50 Rp -
Rp 124,782.63 Rp 96,082.62
Rp 1,430,783.75 Rp -
Rp 203,625.00 Rp -
Rp 825,522.50 Rp -
Rp 592,754.24
unit Rp 592,754.24
Rp 804,280.79
Rp 106,811.10 Rp 683,591.04
Rp 68,871.00 Rp -
Rp 1,666,237.50 Rp -
Rp 81,068.75 Rp -
Rp 73,383.75 Rp -
Rp 712,222.50 Rp -
Rp 97,712.50 Rp -
Rp 124,782.63 Rp 120,689.75
Rp 1,430,783.75 Rp -
Rp 203,625.00 Rp -
Rp 825,522.50 Rp -
Rp 804,280.79
unit Rp 804,280.79
Rp 764,720.39
Rp 106,811.10 Rp 657,956.38
Rp 68,871.00 Rp -
Rp 1,666,237.50 Rp -
Rp 81,068.75 Rp -
Rp 73,383.75 Rp -
Rp 712,222.50 Rp -
Rp 97,712.50 Rp -
Rp 124,782.63 Rp 106,764.01
Rp 1,430,783.75 Rp -
Rp 203,625.00 Rp -
Rp 825,522.50 Rp -
Rp 764,720.39
unit Rp 764,720.39
Rp 381,786.19
Rp 106,811.10 Rp 328,978.19
Rp 68,871.00 Rp -
Rp 1,666,237.50 Rp -
Rp 81,068.75 Rp -
Rp 73,383.75 Rp -
Rp 712,222.50 Rp -
Rp 97,712.50 Rp -
Rp 124,782.63 Rp 52,808.01
Rp 1,430,783.75 Rp -
Rp 203,625.00 Rp -
Rp 825,522.50 Rp -
Rp 381,786.19
unit Rp 381,786.19
RINCIAN
ANALISA HARGA SATUAN P
PEKERJAAN PEMBANGUNAN GE
TAHUN ANGGARAN 2
NO URAIAN
1. 2.
2. PJ5
1. Kusen
-
2. Daun Pintu
-
-
3. Daun Jendela Kaca Mati
-
4. Bouven
-
5. Aksesoris
-
-
-
-
A Jumlah (A+B+C)
B Overhead & Profit (Maksimal 15 %)
C Harga Satuan Pekerjaan (A+B)
3. PT
1. Kusen
-
2. Daun Pintu
-
3. Aksesoris
-
-
-
A Jumlah (A+B+C)
B Overhead & Profit (Maksimal 15 %)
C Harga Satuan Pekerjaan (A+B)
4. PTA
1. Kusen
-
2. Daun Pintu
-
3. Bouven
-
4. Aksesoris
-
-
-
A Jumlah (A+B+C)
B Overhead & Profit (Maksimal 15 %)
C Harga Satuan Pekerjaan (A+B)
5. P1B
1. Kusen
-
2. Daun Pintu
-
3. Bouven
-
4. Aksesoris
-
-
-
A Jumlah (A+B+C)
B Overhead & Profit (Maksimal 15 %)
C Harga Satuan Pekerjaan (A+B)
6. P. Geser
1. Daun Pintu
-
2. Aksesoris
-
-
-
A Jumlah (A+B+C)
B Overhead & Profit (Maksimal 15 %)
C Harga Satuan Pekerjaan (A+B)
7. P2A
1. Kusen
-
2. Daun Pintu
-
3. Bouven
-
4. Aksesoris
-
-
-
A Jumlah (A+B+C)
B Overhead & Profit (Maksimal 15 %)
C Harga Satuan Pekerjaan (A+B)
8. P2B
1. Kusen
-
2. Daun Pintu
-
3. Bouven
-
4. Aksesoris
-
-
-
A Jumlah (A+B+C)
B Overhead & Profit (Maksimal 15 %)
C Harga Satuan Pekerjaan (A+B)
9. P2C
1. Kusen
-
2. Daun Pintu
-
-
3. Bouven
-
4. Aksesoris
-
-
-
A Jumlah (A+B+C)
B Overhead & Profit (Maksimal 15 %)
C Harga Satuan Pekerjaan (A+B)
11. J3
1. Kusen
-
2. Daun Pintu
-
-
3. Bouven
-
4. Aksesoris
-
-
-
A Jumlah (A+B+C)
B Overhead & Profit (Maksimal 15 %)
C Harga Satuan Pekerjaan (A+B)
12. BV1
1. Kusen
-
2. Bouven
-
A Jumlah (A+B+C)
B Overhead & Profit (Maksimal 15 %)
C Harga Satuan Pekerjaan (A+B)
13. BV2
1. Kusen
-
2. Bouven
-
A Jumlah (A+B+C)
B Overhead & Profit (Maksimal 15 %)
C Harga Satuan Pekerjaan (A+B)
13. BV3
1. Kusen
-
2. Bouven
-
A Jumlah (A+B+C)
B Overhead & Profit (Maksimal 15 %)
C Harga Satuan Pekerjaan (A+B)
RINCIAN
ANALISA HARGA SATUAN PEKERJAAN
PEKERJAAN PEMBANGUNAN GEDUNG KOMINFO
TAHUN ANGGARAN 2018
2. 3. 4.
c c
Kusen
Kusen Alumunium Powder Coating 4" m¹
Daun Pintu
Slimar alumunium powder coating 30x100 mm m¹
Pekerjaan Kaca Bening t=8 mm m²
Daun Jendela Kaca Mati
Pekerjaan Kaca Bening t=8 mm m²
Bouven
Pekerjaan Kaca Bening t=5 mm m²
Aksesoris
Swing handle Pasang
Lock case + Double cylinder Bh
Door closer Bh
Hinge roller system Set
Jumlah (A+B+C)
Overhead & Profit (Maksimal 15 %)
Harga Satuan Pekerjaan (A+B)
Kusen
Kusen Alumunium White Powder Coating 4" m¹
Daun Pintu
Pekerjaan Pintu Alumunium Spandrel Unit
Aksesoris
Swing handle Pasang
Lockcase + Bath cylinder Bh
Hinge roller system Set
Jumlah (A+B+C)
Overhead & Profit (Maksimal 15 %)
Harga Satuan Pekerjaan (A+B)
Kusen
Kusen Alumunium White Powder Coating 4" m¹
Daun Pintu
Pekerjaan Pintu Alumunium Spandrel Unit
Bouven
Pekerjaan Kaca Bening t=5 mm m²
Aksesoris
Swing handle Pasang
Lockcase + Bath cylinder Bh
Hinge roller system Set
Jumlah (A+B+C)
Overhead & Profit (Maksimal 15 %)
Harga Satuan Pekerjaan (A+B)
Kusen c c
Kusen Alumunium White Powder Coating 4" m¹
Daun Pintu
Pekerjaan Pintu Wood Composite Plastic (WPC), t = 5 cm + Kaca Unit
Bouven
Pekerjaan Kaca Bening Stopsol t=5 mm m²
Aksesoris
Swing handle Pasang
Lockcase + Double cylinder Bh
Hinge roller system Set
Jumlah (A+B+C)
Overhead & Profit (Maksimal 15 %)
Harga Satuan Pekerjaan (A+B)
P. Geser
Daun Pintu
Pekerjaan Pintu Wood Composite Plastic (WPC), t = 5 cm Unit
Aksesoris
Handle pintu geser Pasang
Rel pintu + assesoris Bh
Floor guide Bh
Jumlah (A+B+C)
Overhead & Profit (Maksimal 15 %)
Harga Satuan Pekerjaan (A+B)
Kusen
Kusen Alumunium White Powder Coating 4" m¹
Daun Pintu
Pekerjaan Pintu Wood Composite Plastic (WPC), t = 5 cm Unit
Bouven
Pekerjaan Kaca Bening Stopsol t=5 mm m²
Aksesoris
Swing handle Pasang
Lockcase + Double cylinder Bh
Hinge roller system Set
Jumlah (A+B+C)
Overhead & Profit (Maksimal 15 %)
Harga Satuan Pekerjaan (A+B)
Kusen c c
Kusen Alumunium White Powder Coating 4" m¹
Daun Pintu
Pekerjaan Pintu Wood Composite Plastic (WPC), t = 5 cm + Kaca Unit
Bouven
Pekerjaan Kaca Bening Stopsol t=5 mm m²
Aksesoris
Swing handle c c Pasang
Lockcase + Double cylinder Bh
Hinge roller system Set
Jumlah (A+B+C)
Overhead & Profit (Maksimal 15 %)
Harga Satuan Pekerjaan (A+B)
Kusen c c
Kusen Alumunium White Powder Coating 4" m¹
Daun Pintu
Slimar alumunium powder coating 30x100 mm m¹
Pekerjaan Kaca Bening t=8 mm m²
Bouven
Pekerjaan Kaca Bening Stopsol t=5 mm m²
Aksesoris
Swing handle c c Pasang
Lockcase + Double cylinder Bh
Hinge roller system Set
Jumlah (A+B+C)
Overhead & Profit (Maksimal 15 %)
Harga Satuan Pekerjaan (A+B)
Pintu Besi
Kusen c c
Besi C 150x50x20x2.8 Kg
Pekerjaan Finishing Cat Baja m²
Daun Pintu
Pintu Besi m²
Pekerjaan Finishing Cat Besi m²
Aksesoris
Swing handle c c Pasang
Lockcase + Bath cylinder Bh
Hinge roller system Set
Jumlah (A+B+C)
Overhead & Profit (Maksimal 15 %)
Harga Satuan Pekerjaan (A+B)
Kusen c c
Kusen Alumunium White Powder Coating 4" m¹
Daun Pintu
Slimar alumunium powder coating 25x80 mm m¹
Pekerjaan Kaca Bening t=8 mm m²
Bouven
Pekerjaan Kaca Bening Bening t=5 mm m²
Aksesoris
Casement 9" c c Bh
Rambuncis c c Bh
Seal daun jendela m¹
Jumlah (A+B+C)
Overhead & Profit (Maksimal 15 %)
Harga Satuan Pekerjaan (A+B)
Kusen c c
Kusen Alumunium White Powder Coating 4" m¹
Bouven
Pekerjaan Kaca Bening Bening t=5 mm m²
Jumlah (A+B+C)
Overhead & Profit (Maksimal 15 %)
Harga Satuan Pekerjaan (A+B)
Kusen c c
Kusen Alumunium White Powder Coating 4" m¹
Bouven
Pekerjaan Kaca Bening Bening t=5 mm m²
Jumlah (A+B+C)
Overhead & Profit (Maksimal 15 %)
Harga Satuan Pekerjaan (A+B)
Kusen c c
Kusen Alumunium White Powder Coating 4" m¹
Bouven
Pekerjaan Kaca Bening Bening t=5 mm m²
Jumlah (A+B+C)
Overhead & Profit (Maksimal 15 %)
Harga Satuan Pekerjaan (A+B)
c c
c c
c c
c c
c c
c c
c c
c c
c c
c c
c c
c c
c c
c c
EKERJAAN
DUNG KOMINFO
018
5. 6. 7. = 5. x 6.
695 1390
40 120
35.100 Rp 133,904.40 Rp 4,700,044.44 300 0
1680 0
3.763 Rp 1,321,569.20 Rp 4,973,329.21 1510
A. TENAGA
B BAHAN
C PERALATAN
M
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
M
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
M
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
M
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
M
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
N
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
N
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
1 Cat Besi (setara Dana Paint Top CM416 kg 0.1000 88,600.00 8,860.00
2 Kuas 5" M421 bh 0.0100 41,100.00 411.00
C PERALATAN
N
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
N
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
N
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
P
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
P
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
P
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
P
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
P
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
P
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
P
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
Q
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
Q
ANALISA HARGA MEKANIKAL SATUAN
: PERENCANAAN TEKNIS PEMBANGUNAN PUSKESMAS KEC. GULUK-GULUK KAB
PEKERJAAN
LOKASI : KEC. GULUK-GULUK KAB. SUMENEP
A PEKERJAAN MEKANIKAL
2 Roof Tank Stainless Steel + Kaki, kap.2500 liter Lengkap dudukan & Access 1.00 unit
- Perlengkapan 1.00 unit
6 Fire Extinguiser (APAR) 3,5 Kg, Dry Chemical Powder 1.00 unit
- Perlengkapan 1.00 unit
HARGA
SATUAN JUMLAH
Rp. Rp.
8,125,000.00 8,125,000.00
406,250.00 406,250.00
Jumlah 8,531,250.00
85,000.00 21,250.00
95,000.00 71,250.00
115,000.00 17,250.00
125,000.00 8,125.00
Jumlah 117,875.00
Total 8,649,125.00
10,953,750.00 10,953,750.00
1,095,375.00 1,095,375.00
Jumlah 12,049,125.00
85,000.00 170,000.00
95,000.00 95,000.00
115,000.00 57,500.00
125,000.00 7,500.00
Jumlah 330,000.00
Total 12,379,125.00
35,000.00 35,000.00
3,500.00 3,500.00
Jumlah 38,500.00
85,000.00 1,700.00
95,000.00 2,850.00
115,000.00 575.00
125,000.00 125.00
Jumlah 5,250.00
Total 43,750.00
41,800.00 41,800.00
4,180.00 4,180.00
Jumlah 45,980.00
85,000.00 1,700.00
95,000.00 2,850.00
115,000.00 575.00
125,000.00 125.00
Jumlah 5,250.00
Total 51,230.00
225,000.00 225,000.00
22,500.00 22,500.00
Jumlah 247,500.00
85,000.00 21,250.00
95,000.00 9,500.00
115,000.00 5,750.00
125,000.00 3,125.00
Jumlah 39,625.00
Total 287,125.00
80,000.00 80,000.00
8,000.00 8,000.00
Jumlah 88,000.00
85,000.00 4,250.00
95,000.00 7,600.00
115,000.00 575.00
125,000.00 125.00
Jumlah 12,550.00
Total 100,550.00
67,980.00 67,980.00
6,798.00 6,798.00
Jumlah 74,778.00
85,000.00 1,275.00
95,000.00 2,375.00
115,000.00 575.00
125,000.00 125.00
Jumlah 4,350.00
Total 79,128.00
27,654.00 27,654.00
2,765.40 2,765.40
Jumlah 30,419.40
85,000.00 850.00
95,000.00 1,900.00
115,000.00 575.00
125,000.00 125.00
Jumlah 3,450.00
Total 33,869.40
17,193.00 17,193.00
1,719.30 1,719.30
Jumlah 18,912.30
85,000.00 850.00
95,000.00 1,900.00
115,000.00 575.00
125,000.00 125.00
Jumlah 3,450.00
Total 22,362.30
2,500,000.00 2,500,000.00
250,000.00 250,000.00
Jumlah 2,750,000.00
85,000.00 255,000.00
95,000.00 95,000.00
115,000.00 57,500.00
125,000.00 7,500.00
Jumlah 415,000.00
Total 3,165,000.00
300,000.00 300,000.00
30,000.00 30,000.00
Jumlah 330,000.00
85,000.00 29,750.00
95,000.00 23,750.00
115,000.00 11,500.00
125,000.00 6,250.00
Jumlah 71,250.00
Total 401,250.00
79,000.00 79,000.00
7,900.00 7,900.00
Jumlah 86,900.00
85,000.00 8,500.00
95,000.00 14,250.00
115,000.00 690.00
125,000.00 500.00
Jumlah 23,940.00
Total 110,840.00
32,600.00 32,600.00
3,260.00 3,260.00
Jumlah 35,860.00
85,000.00 3,060.00
95,000.00 5,700.00
115,000.00 690.00
125,000.00 500.00
Jumlah 9,950.00
Total 45,810.00
275,000.00 275,000.00
27,500.00 27,500.00
Jumlah 302,500.00
85,000.00 4,590.00
95,000.00 9,500.00
115,000.00 1,150.00
125,000.00 500.00
Jumlah 15,740.00
Total 318,240.00
250,000.00 250,000.00
25,000.00 25,000.00
Jumlah 275,000.00
85,000.00 4,590.00
95,000.00 9,500.00
115,000.00 1,150.00
125,000.00 500.00
Jumlah 15,740.00
Total 290,740.00
19,500.00 19,500.00
1,950.00 1,950.00
Jumlah 21,450.00
85,000.00 3,060.00
95,000.00 5,700.00
115,000.00 690.00
125,000.00 500.00
Jumlah 9,950.00
Total 31,400.00
10,000.00 10,000.00
1,500.00 1,500.00
Jumlah 11,500.00
85,000.00 850.00
95,000.00 1,900.00
115,000.00 575.00
125,000.00 125.00
Jumlah 3,450.00
Total 14,950.00
8,000.00 8,000.00
1,200.00 1,200.00
Jumlah 9,200.00
85,000.00 850.00
95,000.00 1,900.00
115,000.00 575.00
125,000.00 125.00
Jumlah 3,450.00
Total 12,650.00
180,000.00 180,000.00
18,000.00 18,000.00
Jumlah 198,000.00
85,000.00 4,590.00
95,000.00 9,500.00
115,000.00 1,150.00
125,000.00 500.00
Jumlah 15,740.00
Total 213,740.00
225,000.00 225,000.00
22,500.00 22,500.00
Jumlah 247,500.00
85,000.00 4,590.00
95,000.00 9,500.00
115,000.00 1,150.00
125,000.00 500.00
Jumlah 15,740.00
Total 263,240.00
1,850,000.00 1,850,000.00
185,000.00 185,000.00
Jumlah 2,035,000.00
85,000.00 8,500.00
95,000.00 13,300.00
115,000.00 2,300.00
125,000.00 500.00
Jumlah 24,600.00
Total 2,059,600.00
3,750,000.00 3,750,000.00
37,500.00 37,500.00
Jumlah 3,787,500.00
85,000.00 85,000.00
95,000.00 114,000.00
115,000.00 86,250.00
125,000.00 62,500.00
Jumlah 347,750.00
Total 4,135,250.00
4,281,250.00 4,281,250.00
42,812.50 42,812.50
Jumlah 4,324,062.50
85,000.00 85,000.00
95,000.00 114,000.00
115,000.00 86,250.00
125,000.00 62,500.00
Jumlah 347,750.00
Total 4,671,812.50
5,356,250.00 5,356,250.00
53,562.50 53,562.50
Jumlah 5,409,812.50
85,000.00 85,000.00
95,000.00 114,000.00
115,000.00 86,250.00
125,000.00 62,500.00
Jumlah 347,750.00
Total 5,757,562.50
7,106,250.00 7,106,250.00
71,062.50 71,062.50
Jumlah 7,177,312.50
85,000.00 85,000.00
95,000.00 114,000.00
115,000.00 86,250.00
125,000.00 62,500.00
Jumlah 347,750.00
Total 7,525,062.50
70,000.00 70,000.00
38,200.00 38,200.00
3,500.00 3,500.00
Jumlah 111,700.00
85,000.00 3,400.00
95,000.00 4,750.00
115,000.00 1,035.00
125,000.00 312.50
Jumlah 9,497.50
Total 121,197.50
97,000.00 97,000.00
19,500.00 19,500.00
4,850.00 4,850.00
Jumlah 121,350.00
85,000.00 3,400.00
95,000.00 4,750.00
115,000.00 1,035.00
125,000.00 312.50
Jumlah 9,497.50
Total 130,847.50
252,045.00 252,045.00
2,600.00 2,600.00
19,500.00 19,500.00
Jumlah 22,100.00
85,000.00 1,275.00
95,000.00 950.00
115,000.00 575.00
125,000.00 312.50
Jumlah 3,112.50
Total 25,212.50
318,000.00 318,000.00
3,180.00 3,180.00
Jumlah 321,180.00
85,000.00 3,400.00
95,000.00 4,750.00
115,000.00 1,035.00
125,000.00 312.50
Jumlah 9,497.50
Total 330,677.50
85,000.00 85,000.00
8,500.00 8,500.00
Jumlah 93,500.00
85,000.00 3,400.00
95,000.00 4,750.00
115,000.00 1,035.00
125,000.00 312.50
Jumlah 9,497.50
Total 102,997.50
ANALISA HARGA ELEKTRIKAL SATUAN
: PERENCANAAN TEKNIS PEMBANGUNAN PUSKESMAS KEC. GULUK-GULUK KAB. SUME
PEKERJ
LOKASI : KEC. GULUK-GULUK KAB. SUMENEP
A PEKERJAAN LISTRIK
I PEKERJAAN KABEL LISTRIK
1 - NYY 4x25 MM² 1.00 Meter
- Perlengkapan 1.00 Meter
Upah :
Pekerja 0.13 hr
Tukang 0.35 hr
Kepala tukang 0.01 hr
Mandor 0.00 hr
Upah :
Pekerja 0.08 hr
Tukang 0.25 hr
Kepala tukang 0.01 hr
Mandor 0.00 hr
Upah :
Pekerja 0.02 hr
Tukang 0.03 hr
Kepala tukang 0.01 hr
Mandor 0.00 hr
Upah :
Pekerja 0.02 hr
Tukang 0.03 hr
Kepala tukang 0.00 hr
Mandor 0.00 hr
Upah :
Pekerja 0.01 hr
Tukang 0.02 hr
Kepala tukang 0.00 hr
Mandor 0.00 hr
Upah :
Pekerja 0.25 hr
Tukang 0.50 hr
Kepala tukang 0.02 hr
Mandor 0.01 hr
Upah :
Pekerja 0.05 hr
Tukang 0.10 hr
Kepala tukang 0.02 hr
Mandor 0.01 hr
3 Downlight Lamp Inbow,LED 1x6 Watt 1.00 bh
- Perlengkapan 1.00 bh
Upah :
Pekerja 0.05 hr
Tukang 0.10 hr
Kepala tukang 0.02 hr
Mandor 0.01 hr
Upah :
Pekerja 0.05 hr
Tukang 0.10 hr
Kepala tukang 0.02 hr
Mandor 0.01 hr
Upah :
Pekerja 0.10 hr
Tukang 0.15 hr
Kepala tukang 0.03 hr
Mandor 0.02 hr
Upah :
Pekerja 0.10 hr
Tukang 0.15 hr
Kepala tukang 0.03 hr
Mandor 0.02 hr
Upah :
Pekerja 0.15 hr
Tukang 0.50 hr
Kepala tukang 0.03 hr
Mandor 0.02 hr
6 Industrial Exhaust Fan Dinding 16" (metal), 75 Watt Lengkap Acc. 1.00 bh
- Perlengkapan & Acc 1.00 bh
Upah :
Pekerja 0.35 hr
Tukang 0.50 hr
Kepala tukang 0.03 hr
Mandor 0.02 hr
7 Lampu PJU Single 9 mtr Oktagonal, LED 70 Watt, Lengkap Pondasi & 1.00 unit
- Lampu PJU LED 70 Watt, Lengkap Acc. 1.00 bh
- Tiang PJU Single Oktagonal 9 mtr 1.00 bh
- MCB 2A, 4,5 kA & Box 1.00 bh
- Kabel NYM 3x2,5 mm2 9.00 bh
- Perlengkapan Pondasi & Acc 1.00 ls
Upah :
Pekerja 0.35 hr
Tukang 0.50 hr
Kepala tukang 0.03 hr
Mandor 0.02 hr
Upah :
Pekerja 0.03 hr
Tukang 0.05 hr
Kepala tukang 0.01 hr
Mandor 0.00 hr
9 - Saklar Serie 1.00 bh
- Perlengkapan 1.00 bh
Upah :
Pekerja 0.03 hr
Tukang 0.05 hr
Kepala tukang 0.01 hr
Mandor 0.00 hr
Upah :
Pekerja 0.05 hr
Tukang 0.08 hr
Kepala tukang 0.01 hr
Mandor 0.00 hr
Upah :
Pekerja 0.22 hr
Tukang 0.40 hr
Kepala tukang 0.01 hr
Mandor 0.00 hr
Upah :
Pekerja 0.22 hr
Tukang 0.40 hr
Kepala tukang 0.01 hr
Mandor 0.00 hr
13 - Saklar Handle, 15 A 500 Volt 1.00 bh
- Perlengkapan 1.00 bh
Upah :
Pekerja 0.03 hr
Tukang 0.05 hr
Kepala tukang 0.01 hr
Mandor 0.00 hr
Upah :
Pekerja 0.03 hr
Tukang 0.05 hr
Kepala tukang 0.01 hr
Mandor 0.00 hr
Upah :
Pekerja 0.05 hr
Tukang 0.08 hr
Kepala tukang 0.01 hr
Mandor 0.00 hr
Upah :
Pekerja 0.05 hr
Tukang 0.08 hr
Kepala tukang 0.01 hr
Mandor 0.00 hr
14 Instalasi Penerangan :
- Kabel NYM 3 X 2,5 mm 10.00 Meter
- Pipa Conduit PVC 20 mm 6.00 Meter
- Fitting ( elbow ,male bush, Joint coupling) 3.00 Buah
- Saddle/Klem 4.00 Buah
- Fresher dan Scrup 5.00 Buah
- Juntion box 1.00 Buah
- Flexible Conduit PVC 20 mm 1.00 Meter
- Tee Dos 1.00 Buah
- Upah pasang 1.00 Titik
16 - Pekerjaan Grounding
- BC Cable 70 mm 6.00 Meter
- Pipa 2" GIP 3.00 Meter
- Spit Tembaga 1.00 Buah
- Klem tembaga 4.00 Buah
- Materia Bantu 1.00 ls
- Upah pasang 1.00 ls
HARGA
SATUAN JUMLAH
Rp. Rp.
249,000.00 249,000.00
12,450.00 12,450.00
Jumlah 261,450.00
85,000.00 10,625.00
95,000.00 33,250.00
115,000.00 920.00
125,000.00 250.00
Jumlah 45,045.00
Total 306,495.00
117,300.00 117,300.00
5,865.00 5,865.00
Jumlah 123,165.00
85,000.00 6,375.00
95,000.00 23,750.00
115,000.00 920.00
125,000.00 250.00
Jumlah 31,295.00
Total 154,460.00
79,375.00 79,375.00
3,968.75 3,968.75
Jumlah 83,343.75
85,000.00 1,700.00
95,000.00 2,375.00
115,000.00 920.00
125,000.00 250.00
Jumlah 5,245.00
Total 88,588.75
26,100.00 26,100.00
1,305.00 1,305.00
Jumlah 27,405.00
85,000.00 1,700.00
95,000.00 2,375.00
115,000.00 230.00
125,000.00 250.00
Jumlah 4,555.00
Total 31,960.00
19,500.00 19,500.00
4,800.00 4,800.00
980.00 980.00
Jumlah 25,280.00
85,000.00 850.00
95,000.00 1,900.00
115,000.00 230.00
125,000.00 250.00
Jumlah 3,230.00
Total 28,510.00
397,500.00 397,500.00
19,875.00 19,875.00
Jumlah 417,375.00
85,000.00 21,250.00
95,000.00 47,500.00
115,000.00 1,725.00
125,000.00 625.00
Jumlah 71,100.00
Total 488,475.00
95,000.00 95,000.00
4,750.00 4,750.00
Jumlah 99,750.00
85,000.00 4,250.00
95,000.00 9,500.00
115,000.00 1,725.00
125,000.00 625.00
Jumlah 16,100.00
Total 115,850.00
86,250.00 86,250.00
4,312.50 4,312.50
Jumlah 90,562.50
85,000.00 4,250.00
95,000.00 9,500.00
115,000.00 1,725.00
125,000.00 625.00
Jumlah 16,100.00
Total 106,662.50
115,000.00 115,000.00
5,750.00 5,750.00
Jumlah 120,750.00
85,000.00 4,250.00
95,000.00 9,500.00
115,000.00 1,725.00
125,000.00 625.00
Jumlah 16,100.00
Total 136,850.00
93,750.00 93,750.00
4,687.50 4,687.50
Jumlah 98,437.50
85,000.00 8,500.00
95,000.00 14,250.00
115,000.00 2,875.00
125,000.00 1,875.00
Jumlah 27,500.00
Total 125,937.50
375,000.00 375,000.00
18,750.00 18,750.00
Jumlah 393,750.00
85,000.00 8,500.00
95,000.00 14,250.00
115,000.00 2,875.00
125,000.00 1,875.00
Jumlah 27,500.00
Total 421,250.00
281,250.00 281,250.00
28,125.00 28,125.00
Jumlah 309,375.00
85,000.00 12,750.00
95,000.00 47,500.00
115,000.00 2,875.00
125,000.00 1,875.00
Jumlah 65,000.00
Total 374,375.00
937,500.00 937,500.00
93,750.00 93,750.00
Jumlah 1,031,250.00
85,000.00 29,750.00
95,000.00 47,500.00
115,000.00 2,875.00
125,000.00 1,875.00
Jumlah 82,000.00
Total 1,113,250.00
1,875,000.00 1,875,000.00
3,500,000.00 3,500,000.00
125,000.00 125,000.00
19,500.00 175,500.00
750,000.00 750,000.00
Jumlah 6,425,500.00
85,000.00 29,750.00
95,000.00 47,500.00
115,000.00 2,875.00
125,000.00 1,875.00
Jumlah 82,000.00
Total 6,507,500.00
30,600.00 30,600.00
1,530.00 1,530.00
Jumlah 32,130.00
85,000.00 2,550.00
95,000.00 4,750.00
115,000.00 575.00
125,000.00 125.00
Jumlah 8,000.00
Total 40,130.00
47,500.00 47,500.00
2,375.00 2,375.00
Jumlah 49,875.00
85,000.00 2,550.00
95,000.00 4,750.00
115,000.00 575.00
125,000.00 125.00
Jumlah 8,000.00
Total 57,875.00
78,000.00 78,000.00
3,900.00 3,900.00
Jumlah 81,900.00
85,000.00 3,825.00
95,000.00 7,125.00
115,000.00 575.00
125,000.00 125.00
Jumlah 11,650.00
Total 93,550.00
800,000.00 800,000.00
40,000.00 40,000.00
Jumlah 840,000.00
85,000.00 18,700.00
95,000.00 38,000.00
115,000.00 575.00
125,000.00 125.00
Jumlah 57,400.00
Total 897,400.00
1,450,000.00 1,450,000.00
72,500.00 72,500.00
Jumlah 1,522,500.00
85,000.00 18,700.00
95,000.00 38,000.00
115,000.00 575.00
125,000.00 125.00
Jumlah 57,400.00
Total 1,579,900.00
98,000.00 98,000.00
4,900.00 4,900.00
Jumlah 102,900.00
85,000.00 2,550.00
95,000.00 4,750.00
115,000.00 575.00
125,000.00 125.00
Jumlah 8,000.00
Total 110,900.00
89,000.00 89,000.00
4,450.00 4,450.00
Jumlah 93,450.00
85,000.00 2,550.00
95,000.00 4,750.00
115,000.00 575.00
125,000.00 125.00
Jumlah 8,000.00
Total 101,450.00
Err:509 Err:509
Err:509 Err:509
Jumlah Err:509
85,000.00 4,250.00
95,000.00 7,125.00
115,000.00 575.00
125,000.00 125.00
Jumlah 12,075.00
Total Err:509
89,000.00 89,000.00
4,450.00 4,450.00
Jumlah 93,450.00
85,000.00 4,250.00
95,000.00 7,125.00
115,000.00 575.00
125,000.00 125.00
Jumlah 12,075.00
Total 105,525.00
19,500.00 195,000.00
4,800.00 28,800.00
5,000.00 15,000.00
1,000.00 4,000.00
250.00 1,250.00
6,500.00 6,500.00
7,500.00 7,500.00
2,700.00 2,700.00
85,000.00 85,000.00
Jumlah 345,750.00
19,500.00 234,000.00
4,800.00 38,400.00
5,000.00 15,000.00
1,000.00 4,000.00
250.00 1,250.00
6,500.00 6,500.00
85,000.00 85,000.00
Jumlah 384,150.00
121,200.00 727,200.00
127,000.00 381,000.00
200,000.00 200,000.00
45,000.00 180,000.00
25,000.00 25,000.00
85,000.00 85,000.00
Jumlah 1,598,200.00
250,000.00 500,000.00
121,200.00 10,302,000.00
127,000.00 762,000.00
200,000.00 200,000.00
45,000.00 3,825,000.00
350,000.00 350,000.00
25,000.00 25,000.00
750,000.00 750,000.00
Jumlah 16,714,000.00
185,000.00 185,000.00
25,000.00 25,000.00
85,000.00 85,000.00
Jumlah 295,000.00
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
R
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
R
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
R
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
R
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
R
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
R
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
R
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
R
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
R
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
R
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
R
ANALISA HARGA SATUAN
I. BAHAN
1 Bahan konstruksi
- Besi siku kg 22.95 14,000.00 321,300.00
- Besi kanal kg 905.80 14,000.00 ###
- Plat Bronz kg 24.64 14,000.00 344,960.00
- Besi plate kg 541.61 14,000.00 7,582,540.00
- Besi plate strip kg 195.78 14,000.00 2,740,920.00
- Besi beton kg 57.92 9,500.00 550,240.00
- pipa kg 11,100.00 -
###
2,804,160.00
IV. PEMBONGKARAN kg
R
ANALISA HARGA SATUAN
I. BAHAN
1 Bahan konstruksi
- Besi siku kg 226.00 14,000.00 3,164,000.00
- Besi plate kg 50.00 14,000.00 700,000.00
- Besi plate strip kg 34.00 14,000.00 476,000.00
- Besi beton kg 12.00 9,500.00 114,000.00
- pipa kg 1.00 11,100.00 11,100.00
4,465,100.00
IV. PEMBONGKARAN kg
R
ANALISA HARGA SATUAN
I. BAHAN
1 Bahan konstruksi
- Besi siku kg 115.00 14,000.00 1,610,000.00
- Besi plate kg 39.00 14,000.00 546,000.00
- Besi plate strip kg 26.00 14,000.00 364,000.00
- Besi beton kg 6.00 9,500.00 57,000.00
- pipa kg 1.00 11,100.00 11,100.00
2,588,100.00
IV. PEMBONGKARAN kg
R
ANALISA HARGA SATUAN
I. BAHAN
1 Bahan konstruksi
- Besi siku kg 138.00 14,000.00 1,932,000.00
- Besi plate kg 21.00 14,000.00 294,000.00
- Besi plate strip kg 31.00 14,000.00 434,000.00
- Besi beton kg 9.00 9,500.00 85,500.00
- pipa kg 1.00 11,100.00 11,100.00
2,756,600.00
IV. PEMBONGKARAN kg
R
ANALISA HARGA SATUAN
I. BAHAN
1 Bahan konstruksi
- Besi siku kg 161.00 14,000.00 2,254,000.00
- Besi plate kg 62.00 14,000.00 868,000.00
- Besi plate strip kg 36.00 14,000.00 504,000.00
- Besi beton kg 12.00 9,500.00 114,000.00
- pipa kg 1.00 11,100.00 11,100.00
3,751,100.00
IV. PEMBONGKARAN kg
R
ANALISA HARGA SATUAN
I. BAHAN
1 Bahan konstruksi
- Besi siku kg 161.00 14,000.00 2,254,000.00
- Besi plate kg 62.00 14,000.00 868,000.00
- Besi plate strip kg 36.00 14,000.00 504,000.00
- Besi beton kg 12.00 9,500.00 114,000.00
- pipa kg 1.00 11,100.00 11,100.00
3,751,100.00
IV. PEMBONGKARAN kg
R
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
RR
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
RR
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
RR
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
RR
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
RR
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
RR
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
RR
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
RR
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
RR
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
RR
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
RR
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
RR
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
RR
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
RR
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
1 Mimic Panel untuk 6 channel pintu air set 1.0000 ### 7,500,000.00
(termasuk pengkabelan sistem sensor)
2 Perlengkapan ruang jaga set 1.0000 ### 2,500,000.00
(meja kursi)
RR
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
RRR
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
1 Air Bersih M486 40.00 1.5000 40.00 60.00
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
1 Tee All Socket PVC Ø 2" x 2" M537 bh 1.0000 59,850.00 59,850.00
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
1 Tee All Socket PVC Ø 3" x 2" M538 bh 1.0000 101,740.00 101,740.00
C PERALATAN
A. TENAGA
B BAHAN
1 Tee All Socket PVC Ø 3" x 3" M539 bh 1.0000 121,690.00 121,690.00
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
1 Tee All Socket PVC Ø 4" x 2" M540 bh 1.0000 161,590.00 161,590.00
C PERALATAN
A. TENAGA
B BAHAN
1 Tee All Socket PVC Ø 4" x 3" M541 bh 1.0000 189,520.00 189,520.00
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
1 Tee All Socket PVC Ø 4" x 4" M542 bh 1.0000 201,490.00 201,490.00
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
S
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
T
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
T
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
T
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
T
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
T
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
T
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
T
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
T
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
T
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
T
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
T
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
T
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
T
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
T
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
T
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
T
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
T
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
T
ANALISA HARGA SATUAN
A. TENAGA
1 Pekerja Biasa L17 Org/hr 2.1250 95,000.00 201,875.00
2 Tukang Batu L07 Org/hr - 115,000.00 -
3 Kepala Tukang Batu L02 Org/hr - 115,000.00 -
4 Mandor L01 Org/hr 0.3613 125,000.00 45,156.25
JUMLAH HARGA TENAGA 247,031.25
B BAHAN
A. TENAGA
1 Pekerja Biasa L17 Org/hr 2.7750 95,000.00 263,625.00
2 Tukang Batu L07 Org/hr - 115,000.00 -
3 Kepala Tukang Batu L02 Org/hr - 115,000.00 -
4 Mandor L01 Org/hr 0.4163 125,000.00 52,031.25
JUMLAH HARGA TENAGA 315,656.25
B BAHAN
T
ANALISA HARGA SATUAN
A. TENAGA
1 Pekerja Biasa L17 Org/hr 3.7500 95,000.00 356,250.00
2 Tukang Batu L07 Org/hr - 115,000.00 -
3 Kepala Tukang Batu L02 Org/hr - 115,000.00 -
4 Mandor L01 Org/hr 0.5625 125,000.00 70,312.50
JUMLAH HARGA TENAGA 426,562.50
B BAHAN
A. TENAGA
1 Pekerja Biasa L17 Org/hr 5.6250 95,000.00 534,375.00
2 Tukang Batu L07 Org/hr - 115,000.00 -
3 Kepala Tukang Batu L02 Org/hr - 115,000.00 -
4 Mandor L01 Org/hr 0.8438 125,000.00 105,468.75
JUMLAH HARGA TENAGA 639,843.75
B BAHAN
T
ANALISA HARGA SATUAN
A. TENAGA
1 Pekerja Biasa L17 Org/hr 7.5000 95,000.00 712,500.00
2 Tukang Batu L07 Org/hr - 115,000.00 -
3 Kepala Tukang Batu L02 Org/hr - 115,000.00 -
4 Mandor L01 Org/hr 1.1250 125,000.00 140,625.00
JUMLAH HARGA TENAGA 853,125.00
B BAHAN
T
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
T
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
T
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
T
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
T
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
T
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
T
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
T
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
T
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
T
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
U
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
U
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
U
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN