BIAYA TOTAL
NO URAIAN PEKERJAAN
BAHAN UPAH BAHAN + UPAH
Terbilang :
REKAPITULASI RENCANA ANGGARAN BIAYA
PROYEK RUMAH TINGGAL
IBU TITIN - BEKASI
PERSIAPAN 2/18
REKAPITULASI RENCANA ANGGARAN BIAYA
PROYEK RUMAH TINGGAL
IBU TITIN - BEKASI
B PEKERJAAN STRUKTUR
I PEKERJAAN TANAH
1 Pemasangan Bouwplank m1 74.75 30,800 15,750 46,550 2,302,300 1,177,313 3,479,613
2 Galian tanah Pondasi dan Sloof m3 43.81 - 52,500 52,500 - 2,299,973 2,299,973
3 Urug tanah kembali + pemadatan ex. Galian tanah m3 19.19 - 21,000 21,000 - 402,953 402,953
4 Peninggian level lantai menggunakan tanah merah (t = 40 cm) m3 37.40 48,000 26,250 74,250 1,795,200 981,750 2,776,950
5 Urugan pasir bawah pondasi, sloof dan lantai (t = 10 cm ) m3 15.62 180,000 26,250 206,250 2,811,060 409,946 3,221,006
6 Beton Lantai kerja bawah pondasi dan sloof (t = 5 cm) m3 7.81 650,000 63,000 713,000 5,075,525 491,936 5,567,461
Struktur Bawah
Cor beton bertulang K – 225
1 Pondasi m3 2.70 840,000 78,750 918,750 2,268,000 212,625 2,480,625
2 Sloof / Tie Beam m3 10.20 840,000 78,750 918,750 8,568,000 803,250 9,371,250
3 Pedestal kolom m3 2.70 840,000 78,750 918,750 2,263,800 212,231 2,476,031
Pembesian tulangan BJTP 24 dan BJTD 40
4 Pondasi kg 402.60 9,000 1,000 10,000 3,623,400 402,600 4,026,000
5 Sloof / Tie Beam kg 1,785.00 9,000 1,000 10,000 16,065,000 1,785,000 17,850,000
6 Pedestal kolom kg 539.00 9,000 1,000 10,000 4,851,000 539,000 5,390,000
Bekisting Bataco
7 Pondasi m2 11.90 62,000 18,500 80,500 737,800 220,150 957,950
8 Sloof / Tie Beam m2 101.66 62,000 18,500 80,500 6,302,920 1,880,710 8,183,630
9 Pedestal kolom m2 30.80 62,000 18,500 80,500 1,909,600 569,800 2,479,400
Struktur Atas
Cor beton bertulang K – 225
1 Kolom m3 3.10 840,000 78,750 918,750 2,604,000 244,125 2,848,125
2 Plat m3 12.90 840,000 78,750 918,750 10,836,000 1,015,875 11,851,875
STR 3/18
REKAPITULASI RENCANA ANGGARAN BIAYA
PROYEK RUMAH TINGGAL
IBU TITIN - BEKASI
V PEKERJAAN ATAP
1 Konstruksi rangka atap dari Hollow 40x40 mm, Jarak 60 cm m2 7.02 50,000 63,000 113,000 351,000 442,260 793,260
2 Flassing pada tepi atap dan dinding m1 2.60 25,000 6,300 31,300 65,000 16,380 81,380
3 Listplank Super Panel 2 x 250 x 12 mm ex. GRC Board m1 8.00 45,000 6,300 51,300 360,000 50,400 410,400
4 Atap polykarbonat m2 7.02 325,000 52,500 377,500 2,281,500 368,550 2,650,050
STR 4/18
REKAPITULASI RENCANA ANGGARAN BIAYA
PROYEK RUMAH TINGGAL
IBU TITIN - BEKASI
STR 5/18
REKAPITULASI RENCANA ANGGARAN BIAYA
PROYEK RUMAH TINGGAL
IBU TITIN - BEKASI
C PEKERJAAN ARSITEKTUR
Lantai Dasar
1 Pasangan bata ringan tebal 10 cm Hebel/celcon/setara m2 204.60 112,900 21,000 133,900 23,099,340 4,296,600
2 Plester + acian halus dengan mortar pada dinding dan kolom ex. MU/setara m2 412.48 35,000 26,250 61,250 14,436,800 10,827,600
3 Finishing cat pada area dalam (Vinilex) m2 228.12 9,000 6,000 15,000 2,053,080 1,368,720
4 Finishing cat pada area luar (Mowilex Weathersield/coat) m2 184.36 20,700 6,000 26,700 3,816,252 1,106,160
5 Pemasangan keramik dinding 20x40 cm ex. Roman (toilet utama) m2 19.52 165,000 31,500 196,500 3,220,800 614,880
6 Pemasangan keramik dinding 20x40 cm ex. Roman (toilet) m2 17.90 165,000 31,500 196,500 2,953,500 563,850
7 Pemasangan keramik dinding dan lantai pada meja dapur m2 4.55 165,000 31,500 196,500 751,163 143,404
8 Pemasangan tali air dari Nad U aluminium uk. 10x10 mm m' 180.83 48,000 6,300 54,300 8,679,840 1,139,229
Lantai Atap
9 Pasangan bata ringan tebal 10 cm Hebel/celcon/setara m2 24.75 112,900 21,000 133,900 2,794,275 519,750
10 Plester + acian halus dengan mortar pada dinding dan kolom/beton ex. MU/setara m2 78.54 35,000 26,250 61,250 2,748,900 2,061,675
11 Finishing cat pada area luar 0 m2 78.54 20,700 6,000 26,700 1,625,778 471,240
Lantai Dasar :
1 Keramik tile uk. 40x40 cm, tipe Glossy, ex. ASIA TILE, pada :
ARS 6/18
REKAPITULASI RENCANA ANGGARAN BIAYA
PROYEK RUMAH TINGGAL
IBU TITIN - BEKASI
Dak Atap :
6 Lantai screeding 5 cm + waterproofing membrane m2 98.70 91,500 27,300 118,800 9,031,050 2,694,510
ARS 7/18
REKAPITULASI RENCANA ANGGARAN BIAYA
PROYEK RUMAH TINGGAL
IBU TITIN - BEKASI
ARS 8/18
REKAPITULASI RENCANA ANGGARAN BIAYA
PROYEK RUMAH TINGGAL
IBU TITIN - BEKASI
V PEKERJAAN SANITARY
Catatan :
Harga terpasang, material utama berikut material bantu,
accessories, sealent, karet, dll termasuk peralatan bantu
lainnya sesuai gambar dan spesifikasinya.
Toilet Utama :
1 Closet Duduk ex. TOTO CW 702 J / SW 784 JP (white) set 1.00 2,420,000 236,250 2,656,250 2,420,000 236,250
2 Shower Spray/Jet washer ex. TOTO TX 403 SPIV set 1.00 297,000 31,500 328,500 297,000 31,500
3 Washtafel ex. TOTO LW 824 CJ + faucet set 1.00 3,135,000 189,000 3,324,000 3,135,000 189,000
4 Shower Head (fullset) ex. TOTO TX 474 SFM set 1.00 1,344,420 94,500 1,438,920 1,344,420 94,500
5 Soap holder ex.TOTO S 161 (white) set 1.00 280,500 31,500 312,000 280,500 31,500
6 Floor drain ex. TOTO TX 1 BV1 bh 1.00 313,500 31,500 345,000 313,500 31,500
Toilet :
1 Closet Jongkok ex. TOTO CE-7 set 1.00 682,000 189,000 871,000 682,000 189,000
2 Shower Head (fullset) ex. TOTO TX 474 SFM set 1.00 1,344,420 94,500 1,438,920 1,344,420 94,500
3 Soap holder ex.TOTO S 161 (white) bh 1.00 280,500 31,500 312,000 280,500 31,500
4 Floor drain ex. TOTO TX 1 BV1 bh 1.00 313,500 31,500 345,000 313,500 31,500
Pantry :
1 Kitchen Zink complete (1 lubang) ex. ROYAL type BARBARA SB-22 set 1.00 990,000 94,500 1,084,500 990,000 94,500
2 Kran zink ex. TOTO TX 605 KES bh 1.00 913,000 31,500 944,500 913,000 31,500
Carport :
1 Kran air ex. TOTO T 26 B 13 set 1.00 281,600 31,500 313,100 281,600 31,500
ARS 9/18
REKAPITULASI RENCANA ANGGARAN BIAYA
PROYEK RUMAH TINGGAL
IBU TITIN - BEKASI
1 Cor meja beton pantry 2550x600x100 mm ( 1 lapis Ø 8 – 200 mm ) m2 1.53 600,000 90,000 690,000 918,000 137,700
2 Railing Hollow 40x40 mm finish zincromate + cat minyak m1 20.00 440,000 44,000 484,000 8,800,000 880,000
3 Pembuatan dan pemasangan Tangga besi putar unit 1.00 3,300,000 315,000 3,615,000 3,300,000 315,000
4 Pembuatan Septiktank uk. 2500x1200 mm unit 1.00 5,500,000 500,000 6,000,000 5,500,000 500,000
5 Penebalan dinding di toilet (Back Monoblok) m2 1.13 112,900 21,000 133,900 127,013 23,625
E PEKERJAAN LANDSCAPE
1 Rumput gajah (ground cover) m2 9.30 30,000 4,500 34,500 279,000 41,850
2 Semak dan tanaman ls 1.00 1,000,000 Include 1,000,000 1,000,000 #VALUE!
ARS 10/18
Jumlah Harga
Bahan+Upah
27,395,940
25,264,400
3,421,800
4,922,412
3,835,680
3,517,350
894,566
9,819,069
3,314,025
4,810,575
2,097,018
89,292,835
ARS 11/18
Jumlah Harga
Bahan+Upah
4,483,050
1,432,600
1,642,550
1,235,000
1,778,400
387,940
342,300
958,360
504,400
620,800
446,200
235,400
214,000
11,725,560
26,006,560
2,971,450
1,020,050
1,161,970
869,260
ARS 12/18
Jumlah Harga
Bahan+Upah
261,800
231,000
1,386,000
188,700
23,758
2,110,240
776,970
1,135,463
12,136,660
2,782,500
5,016,600
7,524,900
5,016,600
23,341,500
3,920,100
1,274,100
ARS 13/18
Jumlah Harga
Bahan+Upah
48,876,300
2,656,250
328,500
3,324,000
1,438,920
312,000
345,000
871,000
1,438,920
312,000
345,000
1,084,500
944,500
313,100
13,713,690
ARS 14/18
Jumlah Harga
Bahan+Upah
1,055,700
9,680,000
3,615,000
6,000,000
150,638
20,501,338
320,850
#VALUE!
#VALUE!
ARS 15/18
RENCANA ANGGARAN BIAYA
REKAPITULASI RENCANA ANGGARAN BIAYA
PROYEK RUMAH TINGGAL
PENJUMLAHAN TOTAL
TOTAL /M&E
RENCANA ANGGARAN BIAYA
REKAPITULASI RENCANA ANGGARAN BIAYA
PROYEK RUMAH TINGGAL
Pekerjaan Elektrikal
A Pengadaan dan Pemasangan Panel dan Kabel Feeder Elektrikal lengkap dengan
material bantu sesuai gambar dan spesifikasi teknis
- MCB BOX Unit 1 600,000 300,000 600,000 300,000
- NYY 4 x 10 mm2 dari MCB BOX ke KWH Meter m 11 86,500 15,000 951,500 165,000
- NYA 3 x 1 x 2,5 mm + PVC Conduit dia. 20 mm untuk lampu Ttk 31 95,000 60,000 2,945,000 1,860,000
- NYA 3 x 1 x 2,5 mm + PVC Conduit dia. 20 mm untuk Power Outlet Ttk 13 130,000 80,000 1,690,000 1,040,000
C Pengadaan dan Pemasangan Instalasi Penangkal Petir lengkap dengan splitzen dan
instalasi kabel BC dan bak kontrol grounding lengkap dengan material bantu sesuai
gambar dan spesifikasi teknis ls 1 Exclude Exclude #VALUE! #VALUE!
D Pengadaan dan Pemasangan instalasi TV lengkap dengan material bantu sesuai gambar
dan spesifikasi teknis
- Antena TV lokal Unit 1 850,000 80,000 850,000 80,000
- outlet TV m 1 45,000 15,000 45,000 15,000
- RG 6 untuk outlet tv ttk 1 95,000 25,000 95,000 25,000
Pekerjaan Plumbing
D Pengadaan & Pemasangan Instalasi Pipa Air bersih dari bahan PVC Class AW
lengkap dengan material bantu sesuai spesifikasi & gambar
- Pipa diameter 40 mm (inst. Pipa dari Jet Pump ke Tangki atap) m 21 31,000 5,000 651,000 105,000
- Pipa diameter 40 mm (Riser) m 12 31,000 5,000 372,000 60,000
- Pipa diameter 32 mm m 3 24,000 5,000 72,000 15,000
- Pipa diameter 20 mm m 29 21,000 5,000 609,000 145,000
- Pipa diameter 15 mm m 14 16,100 5,000 225,400 70,000
- Gate Valve dia. 25 mm Bh 2 95,000 20,000 190,000 40,000
E Pengadaan & Pemasangan Instalasi Pipa Air panas dari bahan PPR PN 20
lengkap dengan material bantu sesuai spesifikasi & gambar
- Pipa diameter 20 mm m 3 32,000 5,000 96,000 15,000
- Pipa diameter 15 mm m 5 20,500 5,000 102,500 25,000
F Pengadaan & Pemasangan Instalasi Pipa Air bekas dari bahan PVC Class AW,
10 Kg/cm2 lengkap dengan material bantu sesuai spesifikasi & gambar
- Pipa diameter 80 mm m 28 60,000 8,000 1,680,000 224,000
- Fitting diameter 80 mm Bh 10 55,000 8,000 550,000 80,000
- Floor Drain 50 mm Bh 2 109,500 15,000 219,000 30,000
- Floor Clean Out 80 mm (Provisional) Bh 12 139,000 15,000 1,668,000 180,000
G Pengadaan & Pemasangan Instalasi Pipa Air Kotor dari bahan PVC Class AW,
10 Kg/cm2 lengkap dengan material bantu sesuai spesifikasi & gambar
- Pipa diameter 100 mm m 20 105,000 8,000 2,100,000 160,000
- Fitting diameter 100 mm Bh 7 75,000 8,000 525,000 56,000
I Pengadaan & Pemasangan Instalasi Pipa Air Hujan dari bahan PVC Class AW,
4.1 / 17 Elektrikal
RENCANA ANGGARAN BIAYA
REKAPITULASI RENCANA ANGGARAN BIAYA
PROYEK RUMAH TINGGAL
Pekerjaan VAC
A IU.1 - IU.2 / OU.2 - OU.2 (Typical) Set 2 3,850,000 350,000 7,700,000 700,000
Type : Split Wall
Kapasitas : 9.000 BTUH ( 1 PK)
Location : Kamar Utama dan Kamar Anak
Instalasi Pipa Refrigrant dan Kabel kontrol Ls 1 410,000 200,000 410,000 200,000
Instalasi Pipa Drain lengkap dengan isolasi Ls 1 175,000 60,000 175,000 60,000
Pengadaan & Pemasangan Peralatan utama Unit FAN termasuk instalasi Ducting,
Kabel Power
Lantai 1
B EF.1.1 Set 1 650,000 120,000 650,000 120,000
Type : Wall Fan
Kap.Udara Supply : 100 Cfm
Power (W/V/Ø/Hz): 100 / 220 / 1 / 50
ESP ( Inc. Wg) : 0.15
Location : Kitchen
Lengkap dengan kabel power material bantu lainnya sesuai dengan gambar
4.1 / 18 Elektrikal