RENCANA ANGGARAN BIAYA
PEMBANGUNAN KONSTRUKSI PENAHAN TEBING DARI BRONJONG (GABION)
SATKER : IAIN AMBON
PAKET PEKERJAA : PEMBANGUNAN KONSTRUKSI PENAHAN TEBING DARI BRONJONG (GABION)
LOKASI : IAIN - AMBON
THN. ANGGARAN : 2018
Hal. - 3
Hrg. Satuan Jml. Harga Total Harga
No. Uraian Pekerjaan Kode Volume Satuan
(Rp) (Rp) (Rp)
STAGE-2
B. PEKERJAAN STRUKTUR
B.1. PEKERJAAN PONDASI
SELASAR
2. Pek. Urugan / Peninggian Level Bangunan B.013 9.37 m³ 233,593.00 2,187,598.45 Rp 2,187,598.45
TERAS DEPAN
STAGE 2
STAGE 1&
3. Pasangan
STAGE 3 Batu ROLAG / (teras depan + rabat keliling) Rp 5,990,455.02
-- Galian Tanah B.001 2.81 m³ 69,718.00 195,914.55
-- Pasangan Pondasi Batu gunung ad. 1 : 5 C.003 5.68 m³ 1,019,986.00 5,794,540.47
1. Sloof Beton
a. S.1 uk. 15 x 20 cm Rp 9,183,069.91
-- Cor Beton - Beton Site Mix K-175 D.005 1.57 m³ 1,240,048.00 1,950,992.32
-- Besi Beton 155.204 kg/m3 D.013 244.19 kg 18,949.00 4,627,079.22
-- Bekisting Kayu 6.667 m2/m3 D.034 10.49 m² 248,360.00 2,604,998.37
3. Balok Beton
a. B.1 [level.1] Uk. 15 x 20 cm (dinding belakang) Rp 11,443,603.37
-- Cor Beton - Beton Site Mix K-175 D.005 1.57 m³ 1,240,048.00 1,950,992.32
-- Besi Beton 143.650 kg/m3 D.013 226.01 kg 18,949.00 4,282,614.31
-- Bekisting Kayu 13.333 m2/m3 D.034 20.98 m² 248,360.00 5,209,996.74
4. Kolom Beton
a. K.1 [klm persegi] Uk. 15 x 15 cm (gedung utama) Rp 12,753,490.26
-- Cor Beton - Beton Site Mix K-175 D.005 1.73 m³ 1,240,048.00 2,148,383.16
Luasan BALOK
-- Besi Beton 148.283 kg/m3 D.013 256.90 kg 18,949.00 4,867,991.10
dan KOLOM
-- Bekisting Kayu 13.333 m2/m3 D.034 23.10 m² 248,360.00 5,737,116.00
C. PEKERJAAN ARSITEKTUR
C.1. PEKERJAAN DINDING
C.1a PEKERJAAN DINDING BATU BATA
J1 Uk. 168 x 234 cm, [type jendela 3 lubang] E.039 2.00 set 4,405,803.00 8,811,606.00
J2 Uk. 160 x 195 cm, [type jendela 2 lubang] E.040 1.00 set 3,016,626.00 3,016,626.00
V2 Uk. 50 x 80 cm, [type ventilasi 1 lubang] E.049 2.00 set 468,122.00 936,244.00
Hal. - 4
Hrg. Satuan Jml. Harga Total Harga
No. Uraian Pekerjaan Kode Volume Satuan
(Rp) (Rp) (Rp)
V3 Uk. 50 x 80 cm, [type ventilasi 1 lubang] [km/wc] E.050 2.00 set 478,716.00 957,432.00
Hal. - 5
Hrg. Satuan Jml. Harga Total Harga
No. Uraian Pekerjaan Kode Volume Satuan
(Rp) (Rp) (Rp)
Hal. - 6
KEMENTERIAN
MAHKAMAH AGAMA
AGUNG REPUBLIK
REPUBLIK INDONESIA
INDONESIA
KANTOR KEMENTERIAN AGAMA
PENGADILAN AGAMA MASOHI
KABUPATEN MALUKU TENGGARA
Jln. Jenderal Sudirman Telp./Fax. (0916) 21069 - Langgur
Masohi - Kab.
e-mail Maluku Tengah
: depagmalra@yahoo.com
Kegiatan :
-- --
Engineer's Estimate
Paket Pekerjaan :
PEMBANGUNAN KONSTRUKSI PENAHAN TEBING DARI
BRONJONG (GABION)
Lokasi :
IAIN - AMBON
Paket Pekerjaan :
PEMBANGUNAN PAGAR KELILING KANWIL KEMENAG MALUKU
Lokasi :
JL. JENDERAL SUDIRMAN, TANTUI - AMBON
#NAME?
I. PEKERJAAN PERSIAPAN/UMUM
1 Papan Nama Proyek 1.00 Ls 500,000.00 500,000.00
2 Pembersihan Lokasi (Awal & Akhir) 1.00 Ls 4,000,000.00 4,000,000.00
3 Pengukuran dan pemasangan bouwplank 1.00 Ls 2,000,000.00 2,000,000.00
4 Air kerja + listrik kerja 1.00 Ls 1,500,000.00 1,500,000.00
5 Administrasi + dokumentasi selama proyek berjalan 1.00 Ls 2,500,000.00 2,500,000.00
6 Pembuatan Gudang Semen & Alat-alat 1.00 Ls 6,000,000.00 6,000,000.00
7 Pembuatan Bedeng Buruh 1.00 Ls 6,000,000.00 6,000,000.00
Jumlah I 22,500,000.00
10 Plesteran Badan Balok Ring ad. 1pc : 5psr G.005 49.88 m2 70,176.00 3,500,028.00
11 Pek. Profil Beton pd Dinding & Kolom Pagar Depan ad. 1pc HB.172 227.32 m' 53,500.00 12,161,620.00
12 Pas. Titik cahaya lampu, (pas.baru) HE.001 22.00 ttk 296,000.00 6,512,000.00
13 Pas. Lampu Hias + Accessories HE.008 22.00 bh 450,000.00 9,900,000.00
14 Pas. Kabel NYM 3x2,5 mm, (eterna) HE.015 150.00 m1 12,300.00 1,845,000.00
15 Pas. Batu Alam Tempel Dinding (depan) H.051 21.12 m2 348,001.00 7,349,259.12
16 Pas. Batu Alam Tempel Kolom (depan) H.051 12.12 m2 348,001.00 4,216,936.92
17 Pek. Acian tembok/beton G.027 544.99 m2 41,417.00 22,571,850.83
18 Pek. Cat dinding, pondasi, sloof, Kolom & Balok M.009 544.99 m2 27,180.00 14,812,828.20
19 Pas. Teralis Pagar Pd Lubang Angin HC.087 31.12 m2 687,000.00 21,380,814.00
Sub Total - II.B. : Pagar Sisi Kanan - Kiri & Belakang (Pjg.Eff. = 92,25 M') 337,675,030.63
Sub Total - II.C. : Pagar Sisi Kanan - Kiri & Belakang (Pjg.Eff. = 63 M') 223,462,418.21
REKPITULASI
SATKER : DINAS KESEHATAN KOTA TUAL
PROGRAM : PROGRAM PENINGKATAN SARANA & PRASARANA APARATUR
: PUSKESMAS/PUSTU DAN JARINGANNYA
KEGIATAN : PEMBANGUNAN RUMAH DINAS
PEKERJAAN : PEMBANGUNAN RMH. DINAS DOKTER PUSKESMAS TAM
LOKASI : TAM - KEC. TAYANDO
THN. ANGGARAN : 2012 Halaman 1 dari 3 Halaman
D. JUMLAH 585,251,680.00
E. JUMLAH DIBULATKAN 585,251,000.00
#NAME?
Rekapitulasi Biaya
II PEKERJAAN REHAB/PEMBANGUNAN ;
a. PEKERJAAN TANAH 25,499,280.99
b. PEKERJAAN PASANGAN DAN BETON 206,004,366.09
c. PEKERJAAN PLESTERAN & KERAMIK 56,197,876.51
d. PEKERJAAN KAYU DAN ATAP 141,165,930.62
e. PEKERJAAN BESI, KACA DAN ALAT PENGGANTUNG 5,535,283.21
f. PEKERJAAN MEKANIKAL / ELEKTRIKAL 20,003,300.00
g. PEKERJAAN SANITAIR -
g. PEKERJAAN PENGECATAN 32,178,068.87
Terbilang : ………………………………………………………………
Penawar,
PT./CV./Fa. …………………
#NAME?
I. PEKERJAAN PERSIAPAN/UMUM
1 Papan Nama Proyek Ls 1.00 500,000.00 500,000.00
2 Pembongkaran + Pembersihan Lokasi (Awal Pelaksanaan) Ls 1.00 5,000,000.00 5,000,000.00
3 Pemagaran dengan seng gelombang tinggi 2 m A.001 m2 - 510,747.00 -
3 Pengukuran dan pemasangan bouwplank A.003 m' - 322,833.00 -
4 Pembuatan Gudang Semen & Peralatan A.005 m2 - 1,438,483.00 -
5 Pembuatan Bedeng Pekerja A.006 m2 - 1,461,034.00 -
6 Kantor Sementara Lantai Plesteran (Direksi keit) A.004 m2 - 1,754,379.00 -
3 Pengukuran dan pemasangan bouwplank Ls 1.00 1,500,000.00 1,500,000.00
4 Pembuatan Gudang Semen & Peralatan Ls 1.00 4,000,000.00 4,000,000.00
5 Pembuatan Bedeng Pekerja Ls 1.00 4,000,000.00 4,000,000.00
6 Kantor Sementara Lantai Plesteran (Direksi keit) Ls 1.00 5,000,000.00 5,000,000.00
7 Air kerja + listrik kerja Ls 1.00 1,500,000.00 1,500,000.00
8 Administrasi + dokumentasi selama proyek berjalan Ls 1.00 1,500,000.00 1,500,000.00
9 Mobilisasi/Demobilisasi Ls - 6,000,000.00 -
9 Pembersihan Akhir (Akhir Pelaksanaan) Ls 1.00 2,000,000.00 2,000,000.00
HARGA JUMLAH
No. JENIS PEKERJAAN KODE SAT VOLUME SATUAN HARGA
Rp. Rp.
No.
NO. JENIS PEKERJAAN SAT. HRG. SAT. ( Rp )
Anls.
1 2 3 4 5
H. INDEKS HARGA SATUAN PEKERJAAN PENUTUP LANTAI & DINDING ........... ( SNI DT 91 -0012-2007 )
1 H.001 6.36 Memasang 1 m2 lantai keramik ukuran (20 x 20) cm m² Rp 241,345.00
2 H.002 6.37 Memasang 1 m2 lantai keramik warna uk. (20 x 25) cm m² Rp 245,345.00
3 H.003 6.35 Memasang 1 m2 lantai keramik warna uk. (30 x 30) cm m² Rp 250,925.00
4 H.004 6.35 Memasang 1 m2 lantai keramik warna uk. (40 x 40) cm m² Rp 206,581.00
5 H.005 6.35 Memasang 1 m2 lantai keramik warna uk. (50 x 50) cm m² Rp 384,081.00
6 H.006 6.35 Memasang 1 m2 lantai keramik warna uk. (60 x 60) cm m² Rp 315,477.00
7 H.007 6.54 Memasang 1 m2 dinding keramik warna uk. (20 x 20) cm m² Rp 269,355.00
8 H.008 6.54b Memasang 1 m2 dinding keramik warna uk. (20 x 25) cm m² Rp 273,355.00
9 H.009 6.57 Memasang 1 m2 dinding batu paras m² Rp 302,610.00
10 H.010 6.58 Memasang 1 m2 dinding batu tempel hitam m² Rp 302,610.00
11 H.011 6.58 Memasang 1 m2 dinding batu alam m² Rp 340,010.00
12 H.012 6.36b Memasang 1 m2 lantai keramik anti slip ukuran (20 x 20) cm m² Rp 247,445.00
18 K.018 6.22 Memasang 1 m1 lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II m' Rp 124,455.00
19 K.019 6.23 Memasang 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III m² Rp 167,340.00
20 K.020 6.24 Memasang 1 m2 dinding pemisah teakwood rangkap, rangka kayu kelas II m² Rp 335,790.00
21 K.021 6.25 Memasang 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas II m² #N/A
L. INDEKS HARGA SATUAN PEKERJAAN KUNCI DAN KACA ........... ( PT. T-30.2000-C )
1 L.001 1 Buah Pasang kunci Tanam Antik bh Rp 273,025.00
2 L.002 1 Buah Pasang kunci Tanam Biasa bh #N/A
3 L.003 1 Buah Pasang kunci Tanam Kamar Mandi bh Rp 233,062.50
4 L.004 1 Buah Pasang kunci Silinder bh Rp 215,668.75
5 L.005 1 Buah Pasang Engsel Pintu bh Rp 55,356.25
6 L.006 1 Buah Pasang Engsel Jendela Kupu - kupu bh Rp 41,837.50
7 L.007 1 Buah Pasang Engsel Angin bh Rp 50,850.00
8 L.008 1 Buah Pasang Spring Knip bh Rp 29,756.25
9 L.009 1 Buah Pasang Kait angin Kecil bh Rp 31,456.25
10 L.010 1 Buah Pasang Kait angin Besar bh Rp 34,556.25
11 L.011 1 Buah Pasang Door Closer bh Rp 249,187.50
12 L.012 1 Buah Pasang Kunci Selot bh Rp 87,975.00
13 L.013 1 Buah Pasang Pegangan Pintu / Door Holder bh #N/A
14 L.014 1 Buah Pasang Door Stop bh Rp 171,837.50
15 L.015 1 Buah Pasang Rel Pintu Dorong bh Rp 239,025.00
16 L.016 1 Buah Pasang Kunci Lemari bh Rp 61,893.75
17 L.017 1 m2 Pasang Kaca Polos tebal 3 mm m² Rp 196,056.25
18 L.018 1 m2 Pasang Kaca Polos tebal 5 mm m² Rp 263,156.25
19 L.019 1 m2 Pasang Kaca Polos tebal 8 mm m² Rp 258,777.50
20 L.020 1 m2 Pasang Kaca Polos tebal 12 mm m² Rp 391,293.75
21 L.021 1 m2 Pasang Kaca Rayband tebal 3 mm m² Rp 317,056.25
22 L.022 1 m2 Pasang Kaca Rayband tebal 5 mm m² Rp 256,556.25
23 L.023 1 m2 Pasang Kaca Rayband tebal 8 mm m² Rp 281,877.50
24 L.024 1 m2 Pasang Kaca Rayband tebal 12 mm m² Rp 351,693.75
25 L.025 1 m2 Pasang Kaca Buram tebal 12 mm m² Rp 391,293.75
26 L.026 1 m2 Pasang Kaca Wireglass tebal 5 mm m² Rp 22,256.25
27 L.027 1 m2 Pasang Kaca Patri tebal 5 mm m² Rp 22,256.25
NO. URAIAN KOEF SAT HRG.SAT. matrial HRG.SAT. upah JML.HRG. matrial JML.HRG. upah TOTAL harga
A B C D E F G=(CxE) H = (C x F ) I=(G+H)
A.002 RSNI. T-15-2002 ; 1 m² Pembuatan Gudang Semen dan Alat - alat Rp 872,980.00 Rp 363,750.00 Rp 1,236,730.00
Bahan :
Dolken kayu galam φ (8–10) cm 1.7000 btg Rp 49,600.00 Rp 84,320.00
Kayu Kelas II 0.2100 m3 Rp 3,160,000.00 Rp 663,600.00
Paku Campur 0.3000 Kg Rp 27,000.00 Rp 8,100.00
Semen Portland (PC) 10.5000 Kg Rp 1,620.00 Rp 17,010.00
Pasir Beton (PB) 0.0300 m3 Rp 250,000.00 Rp 7,500.00
Kerikil Beton (KB) 0.0500 m3 Rp 292,000.00 Rp 14,600.00
Zink gelombang bjls 0,20 1.5000 lbr Rp 51,900.00 Rp 77,850.00
Tenaga :
Pekerja 1.0000 OH Rp 75,000.00 Rp 75,000.00
Tukang 2.0000 OH Rp 125,000.00 Rp 250,000.00
Kepala Tukang 0.2000 OH Rp 150,000.00 Rp 30,000.00
Mandor 0.0500 OH Rp 175,000.00 Rp 8,750.00
B.003 6.9 Mengurug kembali 1 m3 galian (dihitung dari 1/3 kali dari indeks pekerjaan galian) Rp - Rp 20,208.33 Rp 20,208.33
Bahan :
Alat Bantu 0.0000 Ls Rp 1,000.00 Rp -
Tenaga :
Pekerja 0.2500 OH Rp 75,000.00 Rp 18,750.00
Mandor 0.0083 OH Rp 175,000.00 Rp 1,458.33
B.007 6.15 Mengurug 1 m3 sirtu padat untuk peninggian lantai bangunan Rp 362,400.00 Rp 23,125.00 Rp 385,525.00
Bahan :
Tanah Sirtu 1.2000 m3 Rp 302,000.00 Rp 362,400.00
Tenaga :
Pekerja 0.2500 OH Rp 75,000.00 Rp 18,750.00
Mandor 0.0250 OH Rp 175,000.00 Rp 4,375.00
B.008 (1 M3) Timbunan Koral/Bt. Karang/Bt. Belah (berat Min. 40 Kg) Rp 300,000.00 Rp 46,250.00 Rp 346,250.00
Bahan :
Batu Karang Belah (BKB) 1.2000 M3 Rp 250,000.00 Rp 300,000.00
Tenaga :
Pekerja 0.5000 OH Rp 75,000.00 Rp 37,500.00
Mandor 0.0500 OH Rp 175,000.00 Rp 8,750.00
C.002 6.3 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 5 PP Rp 656,320.00 Rp 230,625.00 Rp 886,945.00
Bahan :
Batu Besar (BB) 1.2000 m3 Rp 250,000.00 Rp 300,000.00
Semen Portland (PC) 136.0000 kg Rp 1,620.00 Rp 220,320.00
Pasir Pasangan (PP) 0.5440 m3 Rp 250,000.00 Rp 136,000.00
Tenaga :
Pekerja 1.5000 OH Rp 75,000.00 Rp 112,500.00
Tukang 0.7500 OH Rp 125,000.00 Rp 93,750.00
Kepala Tukang 0.0750 OH Rp 150,000.00 Rp 11,250.00
Mandor 0.0750 OH Rp 175,000.00 Rp 13,125.00
C.004 6.10 Memasang 1 m3 pondasi siklop, 60% beton cmp. 1 PC : 2 PB : 3 KR dan 40% batu belah Rp 2,437,326.00 Rp 403,750.00 Rp 2,841,076.00
Bahan
Batu Besar (BB) 0.4800 m3 Rp 250,000.00 Rp 120,000.00
Semen Portland (PC) 194.0000 kg Rp 1,620.00 Rp 314,280.00
Pasir Pasangan (PP) 0.3120 m3 Rp 250,000.00 Rp 78,000.00
Kerikil Beton (KB) 0.4680 m3 Rp 292,000.00 Rp 136,656.00
Besi Beton (polos/ulir) 126.0000 kg Rp 13,895.00 Rp 1,750,770.00
Kawat Beton (bendrat) 1.8000 kg Rp 20,900.00 Rp 37,620.00
Tenaga
Pekerja 3.4000 OH Rp 75,000.00 Rp 255,000.00
Tukang 0.8500 OH Rp 125,000.00 Rp 106,250.00
Kepala Tukang 0.0850 OH Rp 150,000.00 Rp 12,750.00
Mandor 0.1700 OH Rp 175,000.00 Rp 29,750.00
C.005 6.11 Memasang 1 m3 pondasi sumuran, diameter 100 cm Rp 641,436.00 Rp 312,825.00 Rp 954,261.00
Bahan
Batu Besar (BB) 0.4500 m3 Rp 250,000.00 Rp 112,500.00
Semen Portland (PC) 194.0000 kg Rp 1,620.00 Rp 314,280.00
Pasir Pasangan (PP) 0.3120 m3 Rp 250,000.00 Rp 78,000.00
Kerikil Beton (KB) 0.4680 m3 Rp 292,000.00 Rp 136,656.00
Tenaga
Pekerja 2.4000 OH Rp 75,000.00 Rp 180,000.00
Tukang 0.8000 OH Rp 125,000.00 Rp 100,000.00
Kepala Tukang 0.0800 OH Rp 150,000.00 Rp 12,000.00
Mandor 0.1190 OH Rp 175,000.00 Rp 20,825.00
D.002 6.9 Memasang 1 m2 dinding bata semen/Batako ukuran (8 x 12 x 23) cm tebal 1/2 bata, campuran spesi 1 PC : 4 P Rp 79,780.00 Rp 39,125.00 Rp 118,905.00
Bahan
Batu Bata uk. 23 x 12 x 8 28.0000 Buah Rp 1,800.00 Rp 50,400.00
Semen Portland (PC) 11.5000 kg Rp 1,620.00 Rp 18,630.00
Pasir Pasangan (PP) 0.0430 m3 Rp 250,000.00 Rp 10,750.00
Tenaga
Pekerja 0.3000 OH Rp 75,000.00 Rp 22,500.00
Tukang 0.1000 OH Rp 125,000.00 Rp 12,500.00
Kepala Tukang 0.0100 OH Rp 150,000.00 Rp 1,500.00
Mandor 0.0150 OH Rp 175,000.00 Rp 2,625.00
D.003 6.10 Memasang 1 m2 dinding bata semen/Batako ukuran (8 x 12 x 23) cm tebal 1/2 bata, campuran spesi 1 PC : 5 Rp 77,331.60 Rp 39,125.00 Rp 116,456.60
Bahan
Batu Bata uk. 23 x 12 x 8 28.0000 Buah Rp 1,800.00 Rp 50,400.00
Semen Portland (PC) 9.6800 kg Rp 1,620.00 Rp 15,681.60
Pasir Pasangan (PP) 0.0450 m3 Rp 250,000.00 Rp 11,250.00
Tenaga
Pekerja 0.3000 OH Rp 75,000.00 Rp 22,500.00
Tukang 0.1000 OH Rp 125,000.00 Rp 12,500.00
Kepala Tukang 0.0100 OH Rp 150,000.00 Rp 1,500.00
Mandor 0.0150 OH Rp 175,000.00 Rp 2,625.00
F.002 RSNI. T-15-2002 ; Memasang 1 m' Pipa PVC tipe D Ø 3/4" Rp 14,400.00 Rp 11,415.00 Rp 25,815.00
Bahan
Pipa PVC Tipe-D dia 3/4" 1.2000 m' Rp 12,000.00 Rp 14,400.00
Tenaga
Pekerja 0.0360 OH Rp 75,000.00 Rp 2,700.00
Tukang 0.0600 OH Rp 125,000.00 Rp 7,500.00
Kepala Tukang 0.0060 OH Rp 150,000.00 Rp 900.00
Mandor 0.0018 OH Rp 175,000.00 Rp 315.00
F.003 RSNI. T-15-2002 ; Memasang 1 m' Pipa PVC tipe D Ø 1" Rp 16,800.00 Rp 11,415.00 Rp 28,215.00
Bahan
Pipa PVC Tipe-D dia 1" 1.2000 m' Rp 14,000.00 Rp 16,800.00
Tenaga
Pekerja 0.0360 OH Rp 75,000.00 Rp 2,700.00
Tukang 0.0600 OH Rp 125,000.00 Rp 7,500.00
Kepala Tukang 0.0060 OH Rp 150,000.00 Rp 900.00
Mandor 0.0018 OH Rp 175,000.00 Rp 315.00
F.004 RSNI. T-15-2002 ; Memasang 1 m' Pipa PVC tipe D Ø 1,5" Rp 18,900.00 Rp 11,415.00 Rp 30,315.00
Bahan
Pipa PVC Tipe-D dia 1,5" 1.2000 m' Rp 15,750.00 Rp 18,900.00
Tenaga
Pekerja 0.0360 OH Rp 75,000.00 Rp 2,700.00
Tukang 0.0600 OH Rp 125,000.00 Rp 7,500.00
Kepala Tukang 0.0060 OH Rp 150,000.00 Rp 900.00
Mandor 0.0018 OH Rp 175,000.00 Rp 315.00
F.005 RSNI. T-15-2002 ; Memasang 1 m' Pipa PVC tipe D Ø 2" Rp 21,000.00 Rp 17,122.50 Rp 38,122.50
Bahan
Pipa PVC Tipe-D dia 2" 1.2000 m' Rp 17,500.00 Rp 21,000.00
Tenaga
Pekerja 0.0540 OH Rp 75,000.00 Rp 4,050.00
Tukang 0.0900 OH Rp 125,000.00 Rp 11,250.00
Kepala Tukang 0.0090 OH Rp 150,000.00 Rp 1,350.00
Mandor 0.0027 OH Rp 175,000.00 Rp 472.50
F.006 RSNI. T-15-2002 ; Memasang 1 m' Pipa PVC tipe D Ø 3" Rp 48,000.00 Rp 25,692.50 Rp 73,692.50
Bahan
Pipa PVC Tipe-D dia 3" 1.2000 m' Rp 40,000.00 Rp 48,000.00
Tenaga
Pekerja 0.0810 OH Rp 75,000.00 Rp 6,075.00
Tukang 0.1350 OH Rp 125,000.00 Rp 16,875.00
Kepala Tukang 0.0135 OH Rp 150,000.00 Rp 2,025.00
Mandor 0.0041 OH Rp 175,000.00 Rp 717.50
F.007 RSNI. T-15-2002 ; Memasang 1 m' Pipa PVC tipe D Ø 4" Rp 61,800.00 Rp 25,692.50 Rp 87,492.50
Bahan
Pipa PVC Tipe-D dia 4" 1.2000 m' Rp 51,500.00 Rp 61,800.00
Tenaga
Pekerja 0.0810 OH Rp 75,000.00 Rp 6,075.00
Tukang 0.1350 OH Rp 125,000.00 Rp 16,875.00
Kepala Tukang 0.0135 OH Rp 150,000.00 Rp 2,025.00
Mandor 0.0041 OH Rp 175,000.00 Rp 717.50
F.008 RSNI. T-15-2002 ; Memasang 1 m' Pipa Galvanis Ø ½" Rp 23,800.00 Rp 21,375.00 Rp 45,175.00
Bahan
Pipa GIP medium dia. 1/2" 1.2000 m' Rp 19,833.33 Rp 23,800.00
Tenaga
Pekerja 0.0540 OH Rp 75,000.00 Rp 4,050.00
Tukang 0.0900 OH Rp 125,000.00 Rp 11,250.00
Kepala Tukang 0.0090 OH Rp 150,000.00 Rp 1,350.00
Mandor 0.0270 OH Rp 175,000.00 Rp 4,725.00
F.009 RSNI. T-15-2002 ; Memasang 1 m' Pipa Galvanis Ø ¾" Rp 30,600.00 Rp 21,375.00 Rp 51,975.00
Bahan
Pipa GIP medium dia. 3/4" 1.2000 m' Rp 25,500.00 Rp 30,600.00
Tenaga
Pekerja 0.0540 OH Rp 75,000.00 Rp 4,050.00
Tukang 0.0900 OH Rp 125,000.00 Rp 11,250.00
Kepala Tukang 0.0090 OH Rp 150,000.00 Rp 1,350.00
Mandor 0.0270 OH Rp 175,000.00 Rp 4,725.00
F.010 RSNI. T-15-2002 ; Memasang 1 m' Pipa Galvanis Ø 1" Rp 37,200.00 Rp 21,375.00 Rp 58,575.00
Bahan
Pipa GIP medium dia. 1" 1.2000 m' Rp 31,000.00 Rp 37,200.00
Tenaga
Pekerja 0.0540 OH Rp 75,000.00 Rp 4,050.00
Tukang 0.0900 OH Rp 125,000.00 Rp 11,250.00
Kepala Tukang 0.0090 OH Rp 150,000.00 Rp 1,350.00
Mandor 0.0270 OH Rp 175,000.00 Rp 4,725.00
F.011 RSNI. T-15-2002 ; Memasang 1 m' Pipa Galvanis Ø 1½" Rp 49,200.00 Rp 34,245.00 Rp 83,445.00
Bahan
Pipa GIP medium dia. 1 1/2" 1.2000 m' Rp 41,000.00 Rp 49,200.00
Tenaga
Pekerja 0.1080 OH Rp 75,000.00 Rp 8,100.00
Tukang 0.1800 OH Rp 125,000.00 Rp 22,500.00
Kepala Tukang 0.0180 OH Rp 150,000.00 Rp 2,700.00
Mandor 0.0054 OH Rp 175,000.00 Rp 945.00
G.002 6.2 Membuat 1 m3 beton mutu f’c = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,78 Rp 828,918.99 Rp 176,850.00 Rp 1,005,768.99
Bahan
Semen Portland (PC) 276.00 kg Rp 1,620.00 Rp 447,120.00
Pasir Beton (PB) 828.00 kg Rp 178.57 Rp 147,857.14
Kerikil Beton (KB) 1012.00 kg Rp 216.30 Rp 218,891.85
Air Kerja 215.00 Liter Rp 70.00 Rp 15,050.00
Tenaga
Pekerja 1.6500 OH Rp 75,000.00 Rp 123,750.00
Tukang 0.2750 OH Rp 125,000.00 Rp 34,375.00
Kepala Tukang 0.0280 OH Rp 150,000.00 Rp 4,200.00
Mandor 0.0830 OH Rp 175,000.00 Rp 14,525.00
G.003 6.3 Membuat 1 m3 beton mutu f’c = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = 0,72 Rp 862,081.90 Rp 176,850.00 Rp 1,038,931.90
Bahan
Semen Portland (PC) 299.00 kg Rp 1,620.00 Rp 484,380.00
Pasir Beton (PB) 799.00 kg Rp 178.57 Rp 142,678.57
Kerikil Beton (KB) 1017.00 kg Rp 216.30 Rp 219,973.33
Air Kerja 215.00 Liter Rp 70.00 Rp 15,050.00
Tenaga
Pekerja 1.6500 OH Rp 75,000.00 Rp 123,750.00
Tukang 0.2750 OH Rp 125,000.00 Rp 34,375.00
Kepala Tukang 0.0280 OH Rp 150,000.00 Rp 4,200.00
Mandor 0.0830 OH Rp 175,000.00 Rp 14,525.00
G.004 6.5 Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66 Rp 901,453.17 Rp 176,850.00 Rp 1,078,303.17
Bahan
Semen Portland (PC) 326.00 kg Rp 1,620.00 Rp 528,120.00
Pasir Beton (PB) 760.00 kg Rp 178.57 Rp 135,714.29
Kerikil Beton (KB) 1029.00 kg Rp 216.30 Rp 222,568.89
Air Kerja 215.00 Liter Rp 70.00 Rp 15,050.00
Tenaga
Pekerja 1.6500 OH Rp 75,000.00 Rp 123,750.00
Tukang 0.2750 OH Rp 125,000.00 Rp 34,375.00
Kepala Tukang 0.0280 OH Rp 150,000.00 Rp 4,200.00
Mandor 0.0830 OH Rp 175,000.00 Rp 14,525.00
G.005 6.6 Membuat 1 m3 beton mutu f’c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,61 Rp 938,827.20 Rp 176,850.00 Rp 1,115,677.20
Bahan
Semen Portland (PC) 352.00 kg Rp 1,620.00 Rp 570,240.00
Pasir Beton (PB) 731.00 kg Rp 178.57 Rp 130,535.71
Kerikil Beton (KB) 1031.00 kg Rp 216.30 Rp 223,001.48
Air Kerja 215.00 Liter Rp 70.00 Rp 15,050.00
Tenaga
Pekerja 1.6500 OH Rp 75,000.00 Rp 123,750.00
Tukang 0.2750 OH Rp 125,000.00 Rp 34,375.00
Kepala Tukang 0.0280 OH Rp 150,000.00 Rp 4,200.00
Mandor 0.0830 OH Rp 175,000.00 Rp 14,525.00
G.006 6.7 Membuat 1 m3 beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58 Rp 967,175.08 Rp 176,850.00 Rp 1,144,025.08
Bahan
Semen Portland (PC) 371.00 kg Rp 1,620.00 Rp 601,020.00
Pasir Beton (PB) 698.00 kg Rp 178.57 Rp 124,642.86
Kerikil Beton (KB) 1047.00 kg Rp 216.30 Rp 226,462.22
Air Kerja 215.00 Liter Rp 70.00 Rp 15,050.00
Tenaga
Pekerja 1.6500 OH Rp 75,000.00 Rp 123,750.00
Tukang 0.2750 OH Rp 125,000.00 Rp 34,375.00
Kepala Tukang 0.0280 OH Rp 150,000.00 Rp 4,200.00
Mandor 0.0830 OH Rp 175,000.00 Rp 14,525.00
G.007 6.8 Membuat 1 m3 beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56 Rp 985,433.28 Rp 176,850.00 Rp 1,162,283.28
Bahan
Semen Portland (PC) 384.00 kg Rp 1,620.00 Rp 622,080.00
Pasir Beton (PB) 692.00 kg Rp 178.57 Rp 123,571.43
Kerikil Beton (KB) 1039.00 kg Rp 216.30 Rp 224,731.85
Air Kerja 215.00 Liter Rp 70.00 Rp 15,050.00
Tenaga
Pekerja 1.6500 OH Rp 75,000.00 Rp 123,750.00
Tukang 0.2750 OH Rp 125,000.00 Rp 34,375.00
Kepala Tukang 0.0280 OH Rp 150,000.00 Rp 4,200.00
Mandor 0.0830 OH Rp 175,000.00 Rp 14,525.00
G.008 6.9 Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = 0,53 Rp 1,016,832.86 Rp 176,850.00 Rp 1,193,682.86
Bahan
Semen Portland (PC) 406.00 kg Rp 1,620.00 Rp 657,720.00
Pasir Beton (PB) 684.00 kg Rp 178.57 Rp 122,142.86
Kerikil Beton (KB) 1026.00 kg Rp 216.30 Rp 221,920.00
Air Kerja 215.00 Liter Rp 70.00 Rp 15,050.00
Tenaga
Pekerja 1.6500 OH Rp 75,000.00 Rp 123,750.00
Tukang 0.2750 OH Rp 125,000.00 Rp 34,375.00
Kepala Tukang 0.0280 OH Rp 150,000.00 Rp 4,200.00
Mandor 0.0830 OH Rp 175,000.00 Rp 14,525.00
G.009 6.10 Membuat 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,52 Rp 1,026,555.66 Rp 176,850.00 Rp 1,203,405.66
Bahan
Semen Portland (PC) 413.00 kg Rp 1,620.00 Rp 669,060.00
Pasir Beton (PB) 681.00 kg Rp 178.57 Rp 121,607.14
G.010 6.11 Membuat 1 m3 beton mutu f’c = 28,8 MPa (K 325), slump (12 ± 2) cm, w/c = 0,49 Rp 1,063,466.93 Rp 224,875.00 Rp 1,288,341.93
Bahan
Semen Portland (PC) 439.00 kg Rp 1,620.00 Rp 711,180.00
Pasir Beton (PB) 670.00 kg Rp 178.57 Rp 119,642.86
Kerikil Beton (KB) 1006.00 kg Rp 216.30 Rp 217,594.07
Air Kerja 215.00 Liter Rp 70.00 Rp 15,050.00
Tenaga
Pekerja 2.1000 OH Rp 75,000.00 Rp 157,500.00
Tukang 0.3500 OH Rp 125,000.00 Rp 43,750.00
Kepala Tukang 0.0350 OH Rp 150,000.00 Rp 5,250.00
Mandor 0.1050 OH Rp 175,000.00 Rp 18,375.00
G.011 6.12 Membuat 1 m3 beton mutu f’c = 31,2 MPa (K 350), slump (12 ± 2) cm, w/c = 0,48 Rp 1,076,213.44 Rp 224,875.00 Rp 1,301,088.44
Bahan
Semen Portland (PC) 448.00 kg Rp 1,620.00 Rp 725,760.00
Pasir Beton (PB) 667.00 kg Rp 178.57 Rp 119,107.14
Kerikil Beton (KB) 1000.00 kg Rp 216.30 Rp 216,296.30
Air Kerja 215.00 Liter Rp 70.00 Rp 15,050.00
Tenaga
Pekerja 2.1000 OH Rp 75,000.00 Rp 157,500.00
Tukang 0.3500 OH Rp 125,000.00 Rp 43,750.00
Kepala Tukang 0.0350 OH Rp 150,000.00 Rp 5,250.00
Mandor 0.1050 OH Rp 175,000.00 Rp 18,375.00
G.012 6.17 Pembesian 1 kg dengan besi polos atau besi ulir Rp 14,903.25 Rp 1,575.00 Rp 16,478.25
Bahan
Besi Beton (polos/ulir) 1.0500 kg Rp 13,895.00 Rp 14,589.75
Kawat Beton (bendrat) 0.0150 kg Rp 20,900.00 Rp 313.50
Tenaga
Pekerja 0.0070 OH Rp 75,000.00 Rp 525.00
Tukang 0.0070 OH Rp 125,000.00 Rp 875.00
Kepala Tukang 0.0007 OH Rp 150,000.00 Rp 105.00
Mandor 0.0004 OH Rp 175,000.00 Rp 70.00
G.013 6.19 Memasang 1 kg jaring kawat baja/wire mesh Rp 18,770.50 Rp 892.50 Rp 19,663.00
Bahan
Jaring Kawat Baja di las/Wire Mesh 1.0200 kg Rp 18,300.00 Rp 18,666.00
Kawat Beton (bendrat) 0.0050 kg Rp 20,900.00 Rp 104.50
Tenaga
Pekerja 0.0025 OH Rp 75,000.00 Rp 187.50
Tukang 0.0025 OH Rp 125,000.00 Rp 312.50
Kepala Tukang 0.0025 OH Rp 150,000.00 Rp 375.00
Mandor 0.0001 OH Rp 175,000.00 Rp 17.50
G.027 An.Tek ; Membuat 1 m3 Beton Sikloop K-175, (60% beton cmp. 1 PC : 2 PB : 3 KR dan 40% batu belah) Rp 864,028.80 Rp 1,000.00 Rp 865,028.80
Bahan :
Cor Beton Site Mix K-175 1.0000 M3 Rp 744,028.80 Rp 744,028.80
Batu Karang Belah (BKB) 1.2000 M3 Rp 100,000.00 Rp 120,000.00
Tenaga :
Alat Bantu 1.0000 Ls Rp 1,000.00 Rp 1,000.00
H. INDEKS HARGA SATUAN PEKERJAAN PENUTUP LANTAI & DINDING ........... ( SNI DT 91 -0012-2007 )
H.001 6.36 Memasang 1 m2 lantai keramik ukuran (20 x 20) cm Rp 133,720.00 Rp 107,625.00 Rp 241,345.00
Bahan
Keramik 20 x 20 cm [warna] 26.5000 Buah Rp 2,879.25 Rp 76,300.00
Semen Portland (PC) 10.4000 kg Rp 1,620.00 Rp 16,848.00
Pasir Pasangan (PP) 0.0450 m3 Rp 250,000.00 Rp 11,250.00
Semen Warna 1.6200 kg Rp 18,100.00 Rp 29,322.00
Tenaga
Pekerja 0.7000 OH Rp 75,000.00 Rp 52,500.00
Tukang 0.3500 OH Rp 125,000.00 Rp 43,750.00
Kepala Tukang 0.0350 OH Rp 150,000.00 Rp 5,250.00
Mandor 0.0350 OH Rp 175,000.00 Rp 6,125.00
H.002 6.37 Memasang 1 m2 lantai keramik warna uk. (20 x 25) cm Rp 137,720.00 Rp 107,625.00 Rp 245,345.00
Bahan
Keramik 20 x 25 cm [warna] 21.2000 Buah Rp 3,787.74 Rp 80,300.00
Semen Portland (PC) 10.4000 kg Rp 1,620.00 Rp 16,848.00
Pasir Pasangan (PP) 0.0450 m3 Rp 250,000.00 Rp 11,250.00
Semen Warna 1.6200 kg Rp 18,100.00 Rp 29,322.00
Tenaga
Pekerja 0.7000 OH Rp 75,000.00 Rp 52,500.00
Tukang 0.3500 OH Rp 125,000.00 Rp 43,750.00
Kepala Tukang 0.0350 OH Rp 150,000.00 Rp 5,250.00
Mandor 0.0350 OH Rp 175,000.00 Rp 6,125.00
H.003 6.35 Memasang 1 m2 lantai keramik warna uk. (30 x 30) cm Rp 143,300.00 Rp 107,625.00 Rp 250,925.00
Bahan
Keramik 30 x 30 cm [warna] 11.8700 Buah Rp 7,472.62 Rp 88,700.00
Semen Portland (PC) 10.0000 kg Rp 1,620.00 Rp 16,200.00
Pasir Pasangan (PP) 0.0450 m3 Rp 250,000.00 Rp 11,250.00
Semen Warna 1.5000 kg Rp 18,100.00 Rp 27,150.00
Tenaga
Pekerja 0.7000 OH Rp 75,000.00 Rp 52,500.00
Tukang 0.3500 OH Rp 125,000.00 Rp 43,750.00
Kepala Tukang 0.0350 OH Rp 150,000.00 Rp 5,250.00
Mandor 0.0350 OH Rp 175,000.00 Rp 6,125.00
H.004 6.35 Memasang 1 m2 lantai keramik warna uk. (40 x 40) cm Rp 98,956.00 Rp 107,625.00 Rp 206,581.00
Bahan
Keramik 40 x 40 cm [warna] 6.6300 Buah Rp 7,285.07 Rp 48,300.00
Semen Portland (PC) 9.8000 kg Rp 1,620.00 Rp 15,876.00
Pasir Pasangan (PP) 0.0450 m3 Rp 250,000.00 Rp 11,250.00
Semen Warna 1.3000 kg Rp 18,100.00 Rp 23,530.00
Tenaga
Pekerja 0.7000 OH Rp 75,000.00 Rp 52,500.00
Tukang 0.3500 OH Rp 125,000.00 Rp 43,750.00
Kepala Tukang 0.0350 OH Rp 150,000.00 Rp 5,250.00
Mandor 0.0350 OH Rp 175,000.00 Rp 6,125.00
H.005 6.35 Memasang 1 m2 lantai keramik warna uk. (50 x 50) cm Rp 276,456.00 Rp 107,625.00 Rp 384,081.00
Bahan
Keramik 50 x 50 cm [warna] 4.2432 Buah Rp 53,214.56 Rp 225,800.00
Semen Portland (PC) 9.8000 kg Rp 1,620.00 Rp 15,876.00
Pasir Pasangan (PP) 0.0450 m3 Rp 250,000.00 Rp 11,250.00
Semen Warna 1.3000 kg Rp 18,100.00 Rp 23,530.00
Tenaga
Pekerja 0.7000 OH Rp 75,000.00 Rp 52,500.00
Tukang 0.3500 OH Rp 125,000.00 Rp 43,750.00
Kepala Tukang 0.0350 OH Rp 150,000.00 Rp 5,250.00
Mandor 0.0350 OH Rp 175,000.00 Rp 6,125.00
H.006 6.35 Memasang 1 m2 lantai keramik warna uk. (60 x 60) cm Rp 207,852.00 Rp 107,625.00 Rp 315,477.00
Bahan
Keramik 60 x 60 cm [warna] 3.1000 Buah Rp 49,645.16 Rp 153,900.00
Semen Portland (PC) 9.6000 kg Rp 1,620.00 Rp 15,552.00
Pasir Pasangan (PP) 0.0450 m3 Rp 250,000.00 Rp 11,250.00
Semen Warna 1.5000 kg Rp 18,100.00 Rp 27,150.00
Tenaga
Pekerja 0.7000 OH Rp 75,000.00 Rp 52,500.00
Tukang 0.3500 OH Rp 125,000.00 Rp 43,750.00
Kepala Tukang 0.0350 OH Rp 150,000.00 Rp 5,250.00
Mandor 0.0350 OH Rp 175,000.00 Rp 6,125.00
H.007 6.54 Memasang 1 m2 dinding keramik warna uk. (20 x 20) cm Rp 130,980.00 Rp 138,375.00 Rp 269,355.00
Bahan
Keramik 20 x 20 cm [warna] 26.5000 Buah Rp 2,879.25 Rp 76,300.00
Semen Portland (PC) 9.3000 kg Rp 1,620.00 Rp 15,066.00
Pasir Pasangan (PP) 0.0180 m3 Rp 250,000.00 Rp 4,500.00
Semen Warna 1.9400 kg Rp 18,100.00 Rp 35,114.00
Tenaga
Pekerja 0.9000 OH Rp 75,000.00 Rp 67,500.00
Tukang 0.4500 OH Rp 125,000.00 Rp 56,250.00
Kepala Tukang 0.0450 OH Rp 150,000.00 Rp 6,750.00
Mandor 0.0450 OH Rp 175,000.00 Rp 7,875.00
H.008 6.54b Memasang 1 m2 dinding keramik warna uk. (20 x 25) cm Rp 134,980.00 Rp 138,375.00 Rp 273,355.00
Bahan
Keramik 20 x 25 cm [warna] 21.2000 Buah Rp 3,787.74 Rp 80,300.00
Semen Portland (PC) 9.3000 kg Rp 1,620.00 Rp 15,066.00
Pasir Pasangan (PP) 0.0180 m3 Rp 250,000.00 Rp 4,500.00
Semen Warna 1.9400 kg Rp 18,100.00 Rp 35,114.00
Tenaga
Pekerja 0.9000 OH Rp 75,000.00 Rp 67,500.00
Tukang 0.4500 OH Rp 125,000.00 Rp 56,250.00
Kepala Tukang 0.0450 OH Rp 150,000.00 Rp 6,750.00
Mandor 0.0450 OH Rp 175,000.00 Rp 7,875.00
H.010 6.58 Memasang 1 m2 dinding batu tempel hitam Rp 194,985.00 Rp 107,625.00 Rp 302,610.00
Bahan
Batu Tempel Hitam 1.1000 m2 Rp 152,000.00 Rp 167,200.00
Semen Portland (PC) 11.7500 kg Rp 1,620.00 Rp 19,035.00
Pasir Pasangan (PP) 0.0350 m3 Rp 250,000.00 Rp 8,750.00
Tenaga
Pekerja 0.7000 OH Rp 75,000.00 Rp 52,500.00
Tukang 0.3500 OH Rp 125,000.00 Rp 43,750.00
Kepala Tukang 0.0350 OH Rp 150,000.00 Rp 5,250.00
Mandor 0.0350 OH Rp 175,000.00 Rp 6,125.00
H.012 6.36b Memasang 1 m2 lantai keramik anti slip ukuran (20 x 20) cm Rp 139,820.00 Rp 107,625.00 Rp 247,445.00
Bahan
Keramik 20 x 20 cm [anti slip] 26.5000 Buah Rp 3,109.43 Rp 82,400.00
Semen Portland (PC) 10.4000 kg Rp 1,620.00 Rp 16,848.00
Pasir Pasangan (PP) 0.0450 m3 Rp 250,000.00 Rp 11,250.00
Semen Warna 1.6200 kg Rp 18,100.00 Rp 29,322.00
Tenaga
Pekerja 0.7000 OH Rp 75,000.00 Rp 52,500.00
Tukang 0.3500 OH Rp 125,000.00 Rp 43,750.00
Kepala Tukang 0.0350 OH Rp 150,000.00 Rp 5,250.00
Mandor 0.0350 OH Rp 175,000.00 Rp 6,125.00
I.002 1 m² Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 3 Lapis Cat Penutup Rp 35,349.00 Rp 19,412.50 Rp 54,761.50
Bahan
Cat Meni 0.2000 Kg Rp 39,500.00 Rp 7,900.00
Plamir 0.1500 Kg Rp 8,700.00 Rp 1,305.00
Cat Dasar 0.1700 Kg Rp 28,200.00 Rp 4,794.00
Cat Kayu Glotex 0.3500 Kg Rp 61,000.00 Rp 21,350.00
Tenaga
Pekerja 0.0700 OH Rp 75,000.00 Rp 5,250.00
Tukang 0.1050 OH Rp 125,000.00 Rp 13,125.00
Kepala Tukang 0.0040 OH Rp 150,000.00 Rp 600.00
Mandor 0.0025 OH Rp 175,000.00 Rp 437.50
I.003 1 m² Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup ) Rp 12,790.00 Rp 10,757.50 Rp 23,547.50
Bahan
Plamir 0.1000 Kg Rp 8,700.00 Rp 870.00
Cat Dasar 0.1000 Kg Rp 28,200.00 Rp 2,820.00
Cat Tembok [metrolite Weathershield] 0.2600 Kg Rp 35,000.00 Rp 9,100.00
Tenaga
Pekerja 0.0200 OH Rp 75,000.00 Rp 1,500.00
Tukang 0.0630 OH Rp 125,000.00 Rp 7,875.00
Kepala Tukang 0.0063 OH Rp 150,000.00 Rp 945.00
Mandor 0.0025 OH Rp 175,000.00 Rp 437.50
I.004 1 m² Pengecatan Tembok Lama ( 1 Lapis Cat Dasar, 2 Lapis Cat Penutup ) Rp 9,684.00 Rp 8,417.50 Rp 18,101.50
Bahan
Cat Dasar 0.1200 Kg Rp 28,200.00 Rp 3,384.00
Cat Tembok [metrolite Weathershield] 0.1800 Kg Rp 35,000.00 Rp 6,300.00
Tenaga
Pekerja 0.0280 OH Rp 75,000.00 Rp 2,100.00
Tukang 0.0420 OH Rp 125,000.00 Rp 5,250.00
Kepala Tukang 0.0042 OH Rp 150,000.00 Rp 630.00
Mandor 0.0025 OH Rp 175,000.00 Rp 437.50
I.005 1 m² Pengecatan Langit-langit Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup ) Rp 12,790.00 Rp 10,757.50 Rp 23,547.50
Bahan
Plamir 0.1000 Kg Rp 8,700.00 Rp 870.00
Cat Dasar 0.1000 Kg Rp 28,200.00 Rp 2,820.00
Cat Tembok [metrolite Weathershield] 0.2600 Kg Rp 35,000.00 Rp 9,100.00
Tenaga
Pekerja 0.0200 OH Rp 75,000.00 Rp 1,500.00
Tukang 0.0630 OH Rp 125,000.00 Rp 7,875.00
Kepala Tukang 0.0063 OH Rp 150,000.00 Rp 945.00
Mandor 0.0025 OH Rp 175,000.00 Rp 437.50
J.002 Memasang 1 buah Bak Fiberglass volume 1,00 m³ air Rp 141,000.00 Rp 1,080,000.00 Rp 1,221,000.00
Bahan
Bak Mandi Fiberglass (kav. 1,00 m3) 1.0000 bh Rp 140,000.00 Rp 140,000.00
Perlengkapan 1.0000 ls Rp 1,000.00 Rp 1,000.00
Tenaga
Pekerja 3.0000 OH Rp 75,000.00 Rp 225,000.00
Tukang 4.5000 OH Rp 125,000.00 Rp 562,500.00
Kepala Tukang 0.9000 OH Rp 150,000.00 Rp 135,000.00
Mandor 0.9000 OH Rp 175,000.00 Rp 157,500.00
J.004 Memasang 1 buah Kloset Duduk Lengkap dengan Box Rp 3,647,800.00 Rp 305,650.00 Rp 3,953,450.00
Bahan
Klosed Duduk Lengkap dg Box 1.0000 bh Rp 2,806,000.00 Rp 2,806,000.00
Perlengkapan (30% Dari bahan) 0.3000 Rp 2,806,000.00 Rp 841,800.00
Tenaga
Pekerja 2.1000 OH Rp 75,000.00 Rp 157,500.00
Tukang 0.9600 OH Rp 125,000.00 Rp 120,000.00
Kepala Tukang 0.0010 OH Rp 150,000.00 Rp 150.00
Mandor 0.1600 OH Rp 175,000.00 Rp 28,000.00
J.006 Memasang 1 buah Wastafel lengkap dengan Kaca Cermin Rp 469,220.00 Rp 296,250.00 Rp 765,470.00
Bahan
Wastafel + Kaca Cermin (komplit) 1.0000 bh Rp 457,000.00 Rp 457,000.00
Semen Portland (PC) 6.0000 Kg Rp 1,620.00 Rp 9,720.00
Pasir Pasangan (PP) 0.0100 m3 Rp 250,000.00 Rp 2,500.00
Tenaga
Pekerja 1.0000 OH Rp 75,000.00 Rp 75,000.00
Tukang 1.4500 OH Rp 125,000.00 Rp 181,250.00
Kepala Tukang 0.1500 OH Rp 150,000.00 Rp 22,500.00
Mandor 0.1000 OH Rp 175,000.00 Rp 17,500.00
J.012 Memasang 1 Unit Septictank 2,5 x 1,5 x 2 M + Rembesannya (Kantor Type Besar) Rp 16,461,445.52 Rp - Rp 16,461,445.52
Galian tanah kedalaman 2 m' 7.5000 m³ Rp 75,375.00 Rp 565,312.50
Pasir urug 0.3570 m³ Rp 324,250.00 Rp 115,757.25
Lantai kerja (K.100) 3.7500 m³ Rp 896,700.58 Rp 3,362,627.18
Pas. bata 1 pc : 3 ps + Plesteran 1 pc : 3 Ps 25.0000 m² Rp 187,276.52 Rp 4,681,913.00
Plat beton penutup tbl. 8 cm + Balok 15/20 0.5000 m³ Rp 10,338,887.85 Rp 5,169,443.92
Pipa PVC 4" jenis AW + sambungan 9.0000 m1 Rp 83,250.00 Rp 749,250.00
Pipa GIP 1/2" 2.0000 m1 Rp 19,833.33 Rp 39,666.67
Galian tanah untuk rembesan 5.6250 m³ Rp 75,375.00 Rp 423,984.38
Pas. injuk 9.0000 kg Rp 33,900.00 Rp 305,100.00
Urugan kerikil 3,5 cm 1.7500 m³ Rp 292,000.00 Rp 511,000.00
Pipa PVC 4" berlobang jenis AW 6.0000 m1 Rp 83,250.00 Rp 499,500.00
Urugan kembali perataan tanah 1.8750 m³ Rp 20,208.33 Rp 37,890.63
J.013 Memasang 1 Unit Septictank 2 x 1,5 x 1,5 M + Rembesannya (Kantor Type Kecil) Rp 10,326,417.31 Rp - Rp 10,326,417.31
Galian tanah kedalaman 2 m' 4.5000 m³ Rp 75,375.00 Rp 339,187.50
Pasir urug 0.2142 m³ Rp 324,250.00 Rp 69,454.35
Lantai kerja (K.100) 2.2500 m³ Rp 896,700.58 Rp 2,017,576.31
Pas. bata 1 pc : 3 ps + Plesteran 1 pc : 3 Ps 15.0000 m² Rp 187,276.52 Rp 2,809,147.80
Plat beton penutup tbl. 8 cm + Balok 15/20 0.3000 m³ Rp 10,338,887.85 Rp 3,101,666.35
Pipa PVC 4" jenis AW + sambungan 5.4000 m1 Rp 83,250.00 Rp 449,550.00
Pipa GIP 1/2" 1.2000 m1 Rp 19,833.33 Rp 23,800.00
Galian tanah untuk rembesan 3.3750 m³ Rp 75,375.00 Rp 254,390.63
Pas. injuk 5.4000 kg Rp 33,900.00 Rp 183,060.00
Urugan kerikil 3,5 cm 1.0500 m³ Rp 292,000.00 Rp 306,600.00
J.014 Memasang 1 Unit Septictank 1,5 x 1,0 x 1,5 M + Rembesannya (Rumah Kapasitas Kecil) Rp 6,062,308.66 Rp - Rp 6,062,308.66
Galian tanah kedalaman 2 m' 2.2500 m³ Rp 75,375.00 Rp 169,593.75
Pasir urug 0.1071 m³ Rp 324,250.00 Rp 34,727.18
Lantai kerja (K.100) 1.1250 m³ Rp 896,700.58 Rp 1,008,788.15
Pas. bata 1 pc : 3 ps + Plesteran 1 pc : 3 Ps 7.5000 m² Rp 187,276.52 Rp 1,404,573.90
Plat beton penutup tbl. 8 cm + Balok 15/20 0.1500 m³ Rp 10,338,887.85 Rp 1,550,833.18
Pipa PVC 4" jenis AW + sambungan 9.0000 m1 Rp 83,250.00 Rp 749,250.00
Pipa GIP 1/2" 0.6000 m1 Rp 19,833.33 Rp 11,900.00
Galian tanah untuk rembesan 1.6875 m³ Rp 75,375.00 Rp 127,195.31
Pas. injuk 2.7000 kg Rp 33,900.00 Rp 91,530.00
Urugan kerikil 3,5 cm 0.5250 m³ Rp 292,000.00 Rp 153,300.00
Pipa PVC 4" berlobang jenis AW 9.0000 m1 Rp 83,250.00 Rp 749,250.00
Urugan kembali perataan tanah 0.5625 m³ Rp 20,208.33 Rp 11,367.19
J.015 Memasang 1m' Saluran Keliling Bangunan ukuran (35 x 40) cm Rp 223,837.73 Rp - Rp 223,837.73
Galian Tanah 0.3025 M3 Rp 60,625.00 Rp 18,339.06
Pas. Batu Bata Camp. 1 : 4 0.8000 M2 Rp 118,905.00 Rp 95,124.00
Urugan Pasir tbl. 8 cm dibawah rabat saluran 0.0440 M3 Rp 324,250.00 Rp 14,267.00
Rabat Beton 1 : 3 : 5, tbl. 10 cm (K-100) 0.0350 M2 Rp 896,700.58 Rp 31,384.52
Pelesteran camp. 1 : 4 1.0400 M2 Rp 62,233.80 Rp 64,723.15
K.002 6.2 Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III Rp 3,995,250.00 Rp 3,022,500.00 Rp 7,017,750.00
Bahan
Kayu Kelas II 1.2000 m3 Rp 3,160,000.00 Rp 3,792,000.00
Paku Campur 1.2500 kg Rp 27,000.00 Rp 33,750.00
Lem kayu 1.0000 kg Rp 169,500.00 Rp 169,500.00
Tenaga
Pekerja 6.0000 OH Rp 75,000.00 Rp 450,000.00
Tukang 18.0000 OH Rp 125,000.00 Rp 2,250,000.00
Kepala Tukang 1.8000 OH Rp 150,000.00 Rp 270,000.00
Mandor 0.3000 OH Rp 175,000.00 Rp 52,500.00
K.003 6.5 Membuat dan memasang 1 m2 daun pintu panel, kayu kelas I atau II Rp 401,150.00 Rp 503,750.00 Rp 904,900.00
Bahan
Papan Kayu Kelas I 0.0400 m3 Rp 7,910,000.00 Rp 316,400.00
Lem kayu 0.5000 kg Rp 169,500.00 Rp 84,750.00
Tenaga
Pekerja 1.0000 OH Rp 75,000.00 Rp 75,000.00
Tukang 3.0000 OH Rp 125,000.00 Rp 375,000.00
Kepala Tukang 0.3000 OH Rp 150,000.00 Rp 45,000.00
Mandor 0.0500 OH Rp 175,000.00 Rp 8,750.00
K.004 6.6 Membuat dan memasang 1 m2 pintu dan jendela kaca, kayu kelas I atau II Rp 240,690.00 Rp 403,000.00 Rp 643,690.00
Bahan
Papan Kayu Kelas I 0.0240 m3 Rp 7,910,000.00 Rp 189,840.00
Lem kayu 0.3000 kg Rp 169,500.00 Rp 50,850.00
Tenaga
Pekerja 0.8000 OH Rp 75,000.00 Rp 60,000.00
Tukang 2.4000 OH Rp 125,000.00 Rp 300,000.00
Kepala Tukang 0.2400 OH Rp 150,000.00 Rp 36,000.00
Mandor 0.0400 OH Rp 175,000.00 Rp 7,000.00
K.005 6.7 Membuat dan memasang 1 m2 pintu dan jendela jalusi kayu kelas I atau II Rp 590,990.00 Rp 503,750.00 Rp 1,094,740.00
Bahan
Papan Kayu Kelas I 0.0640 m3 Rp 7,910,000.00 Rp 506,240.00
Lem kayu 0.5000 kg Rp 169,500.00 Rp 84,750.00
Tenaga
Pekerja 1.0000 OH Rp 75,000.00 Rp 75,000.00
Tukang 3.0000 OH Rp 125,000.00 Rp 375,000.00
Kepala Tukang 0.3000 OH Rp 150,000.00 Rp 45,000.00
Mandor 0.0500 OH Rp 175,000.00 Rp 8,750.00
K.006 6.8 Membuat 1 m2 daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu kelas II (lebar sampai 90 cm) #N/A Rp 352,625.00 #N/A
Bahan
Papan Kayu Kelas II 0.0250 m3 Rp 3,160,000.00 Rp 79,000.00
Paku uk. 1 cm - 4 cm 0.0300 kg Rp 23,400.00 Rp 702.00
Lem kayu 0.5000 kg Rp 169,500.00 Rp 84,750.00
Plywood tbl. 4 mm 1.0000 Lembar #N/A #N/A
Tenaga
Pekerja 0.7000 OH Rp 75,000.00 Rp 52,500.00
Tukang 2.1000 OH Rp 125,000.00 Rp 262,500.00
Kepala Tukang 0.2100 OH Rp 150,000.00 Rp 31,500.00
Mandor 0.0350 OH Rp 175,000.00 Rp 6,125.00
K.007 6.9 Membuat 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II #N/A Rp 403,000.00 #N/A
Bahan
K.008 6.10 Memasang 1 m2 jalusi kusen, kayu kelas I atau II Rp 193,110.00 Rp 388,875.00 Rp 581,985.00
Bahan
Papan Kayu Kelas II 0.0600 m3 Rp 3,160,000.00 Rp 189,600.00
Paku uk. 1 cm - 4 cm 0.1500 kg Rp 23,400.00 Rp 3,510.00
Tenaga
Pekerja 0.6700 OH Rp 75,000.00 Rp 50,250.00
Tukang 2.0000 OH Rp 125,000.00 Rp 250,000.00
Kepala Tukang 0.2000 OH Rp 150,000.00 Rp 30,000.00
Mandor 0.3350 OH Rp 175,000.00 Rp 58,625.00
K.009 6.11 Memasang 1 m2 teakwood rangkap, rangka expose kayu kelas I Rp 334,802.00 Rp 403,000.00 Rp 737,802.00
Bahan
Papan Kayu Kelas I 0.0250 m3 Rp 7,910,000.00 Rp 197,750.00
Paku uk. 1 cm - 4 cm 0.0300 kg Rp 23,400.00 Rp 702.00
Lem kayu 0.3000 kg Rp 169,500.00 Rp 50,850.00
Teakwood tbl. 4 mm 1.0000 Lembar Rp 85,500.00 Rp 85,500.00
Tenaga
Pekerja 0.8000 OH Rp 75,000.00 Rp 60,000.00
Tukang 2.4000 OH Rp 125,000.00 Rp 300,000.00
Kepala Tukang 0.2400 OH Rp 150,000.00 Rp 36,000.00
Mandor 0.0400 OH Rp 175,000.00 Rp 7,000.00
K.010 6.13 Memasang 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter Rp 9,063,840.00 Rp 2,015,000.00 Rp 11,078,840.00
Bahan
Kayu Kelas I 1.1000 m3 Rp 7,910,000.00 Rp 8,701,000.00
Besi strip tebal 5 mm 15.0000 kg Rp 16,200.00 Rp 243,000.00
Paku uk. 5 cm - 12 cm 5.6000 kg Rp 21,400.00 Rp 119,840.00
Tenaga
Pekerja 4.0000 OH Rp 75,000.00 Rp 300,000.00
Tukang 12.0000 OH Rp 125,000.00 Rp 1,500,000.00
Kepala Tukang 1.2000 OH Rp 150,000.00 Rp 180,000.00
Mandor 0.2000 OH Rp 175,000.00 Rp 35,000.00
K.011 6.14 Memasang 1 m3 konstruksi kuda-kuda expose, kayu kelas I Rp 9,854,840.00 Rp 3,375,125.00 Rp 13,229,965.00
Bahan
Kayu Kelas I 1.2000 m3 Rp 7,910,000.00 Rp 9,492,000.00
Besi strip tebal 5 mm 15.0000 kg Rp 16,200.00 Rp 243,000.00
Paku uk. 5 cm - 12 cm 5.6000 kg Rp 21,400.00 Rp 119,840.00
Tenaga
Pekerja 6.7000 OH Rp 75,000.00 Rp 502,500.00
Tukang 20.1000 OH Rp 125,000.00 Rp 2,512,500.00
Kepala Tukang 2.0100 OH Rp 150,000.00 Rp 301,500.00
Mandor 0.3350 OH Rp 175,000.00 Rp 58,625.00
K.012 6.15 Memasang 1 m3 konstruksi gordeng, kayu kelas II Rp 3,783,200.00 Rp 1,209,000.00 Rp 4,992,200.00
Bahan
Kayu Kelas II 1.1000 m3 Rp 3,160,000.00 Rp 3,476,000.00
Besi strip tebal 5 mm 15.0000 kg Rp 16,200.00 Rp 243,000.00
Paku uk. 5 cm - 12 cm 3.0000 kg Rp 21,400.00 Rp 64,200.00
Tenaga
Pekerja 2.4000 OH Rp 75,000.00 Rp 180,000.00
Tukang 7.2000 OH Rp 125,000.00 Rp 900,000.00
Kepala Tukang 0.7200 OH Rp 150,000.00 Rp 108,000.00
Mandor 0.1200 OH Rp 175,000.00 Rp 21,000.00
K.013 6.16 Memasang 1 m2 rangka atap genteng keramik, kayu kelas II Rp 163,350.00 Rp 22,375.00 Rp 185,725.00
Bahan
Kaso-kaso (5 x 7) cm 0.0140 m3 Rp 3,160,000.00 Rp 44,240.00
Reng (2 x 3) cm 0.0360 m3 Rp 3,160,000.00 Rp 113,760.00
Paku uk. 5 cm - 12 cm 0.2500 kg Rp 21,400.00 Rp 5,350.00
Tenaga
Pekerja 0.1000 OH Rp 75,000.00 Rp 7,500.00
Tukang 0.1000 OH Rp 125,000.00 Rp 12,500.00
Kepala Tukang 0.0100 OH Rp 150,000.00 Rp 1,500.00
Mandor 0.0050 OH Rp 175,000.00 Rp 875.00
K.014 6.17 Memasang 1 m2 rangka atap genteng beton, kayu kelas II Rp 229,710.00 Rp 22,375.00 Rp 252,085.00
Bahan
Kaso-kaso (5 x 7) cm 0.0140 m3 Rp 3,160,000.00 Rp 44,240.00
Reng (3 x 4) cm 0.0570 m3 Rp 3,160,000.00 Rp 180,120.00
Paku uk. 5 cm - 12 cm 0.2500 kg Rp 21,400.00 Rp 5,350.00
Tenaga
Pekerja 0.1000 OH Rp 75,000.00 Rp 7,500.00
Tukang 0.1000 OH Rp 125,000.00 Rp 12,500.00
Kepala Tukang 0.0100 OH Rp 150,000.00 Rp 1,500.00
Mandor 0.0050 OH Rp 175,000.00 Rp 875.00
K.015 6.19 Memasang 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III Rp 52,944.00 Rp 66,375.00 Rp 119,319.00
Bahan
Kaso-kaso (5 x 7) cm 0.0154 m3 Rp 3,160,000.00 Rp 48,664.00
Paku uk. 5 cm - 12 cm 0.2000 kg Rp 21,400.00 Rp 4,280.00
Tenaga
K.016 6.20 Memasang 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III Rp 56,858.00 Rp 58,750.00 Rp 115,608.00
Bahan
Kaso-kaso (5 x 7) cm 0.0163 m3 Rp 3,160,000.00 Rp 51,508.00
Paku uk. 5 cm - 12 cm 0.2500 kg Rp 21,400.00 Rp 5,350.00
Tenaga
Pekerja 0.2000 OH Rp 75,000.00 Rp 15,000.00
Tukang 0.3000 OH Rp 125,000.00 Rp 37,500.00
Kepala Tukang 0.0300 OH Rp 150,000.00 Rp 4,500.00
Mandor 0.0100 OH Rp 175,000.00 Rp 1,750.00
K.017 6.21 Memasang 1 m1 lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II Rp 87,568.00 Rp 36,375.00 Rp 123,943.00
Bahan
Papan Kayu Kelas I 0.0108 m3 Rp 7,910,000.00 Rp 85,428.00
Paku uk. 5 cm - 12 cm 0.1000 kg Rp 21,400.00 Rp 2,140.00
Tenaga
Pekerja 0.1000 OH Rp 75,000.00 Rp 7,500.00
Tukang 0.2000 OH Rp 125,000.00 Rp 25,000.00
Kepala Tukang 0.0200 OH Rp 150,000.00 Rp 3,000.00
Mandor 0.0050 OH Rp 175,000.00 Rp 875.00
K.018 6.22 Memasang 1 m1 lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II Rp 88,080.00 Rp 36,375.00 Rp 124,455.00
Bahan
Papan Kayu Kelas I 0.0110 m3 Rp 7,910,000.00 Rp 87,010.00
Paku uk. 5 cm - 12 cm 0.0500 kg Rp 21,400.00 Rp 1,070.00
Tenaga
Pekerja 0.1000 OH Rp 75,000.00 Rp 7,500.00
Tukang 0.2000 OH Rp 125,000.00 Rp 25,000.00
Kepala Tukang 0.0200 OH Rp 150,000.00 Rp 3,000.00
Mandor 0.0050 OH Rp 175,000.00 Rp 875.00
K.019 6.23 Memasang 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III Rp 91,690.00 Rp 75,650.00 Rp 167,340.00
Bahan
Papan Kayu Kelas II 0.0280 m3 Rp 3,160,000.00 Rp 88,480.00
Paku uk. 5 cm - 12 cm 0.1500 kg Rp 21,400.00 Rp 3,210.00
Tenaga
Pekerja 0.1500 OH Rp 75,000.00 Rp 11,250.00
Tukang 0.4500 OH Rp 125,000.00 Rp 56,250.00
Kepala Tukang 0.0450 OH Rp 150,000.00 Rp 6,750.00
Mandor 0.0080 OH Rp 175,000.00 Rp 1,400.00
K.020 6.24 Memasang 1 m2 dinding pemisah teakwood rangkap, rangka kayu kelas II Rp 260,140.00 Rp 75,650.00 Rp 335,790.00
Bahan
Kayu Kelas II 0.0280 m3 Rp 3,160,000.00 Rp 88,480.00
Paku uk. 5 cm - 12 cm 0.1500 kg Rp 21,400.00 Rp 3,210.00
Teakwood tbl. 4 mm 0.8600 Lembar Rp 85,500.00 Rp 73,530.00
Lem kayu 0.5600 kg Rp 169,500.00 Rp 94,920.00
Tenaga
Pekerja 0.1500 OH Rp 75,000.00 Rp 11,250.00
Tukang 0.4500 OH Rp 125,000.00 Rp 56,250.00
Kepala Tukang 0.0450 OH Rp 150,000.00 Rp 6,750.00
Mandor 0.0080 OH Rp 175,000.00 Rp 1,400.00
K.021 6.25 Memasang 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas II #N/A Rp 100,750.00 #N/A
Bahan
Kayu Kelas II 0.0280 m3 Rp 3,160,000.00 Rp 88,480.00
Paku uk. 5 cm - 12 cm 0.1500 kg Rp 21,400.00 Rp 3,210.00
Plywood tbl. 4 mm 0.8600 Lembar #N/A #N/A
Lem kayu 0.5600 kg Rp 169,500.00 Rp 94,920.00
Tenaga
Pekerja 0.2000 OH Rp 75,000.00 Rp 15,000.00
Tukang 0.6000 OH Rp 125,000.00 Rp 75,000.00
Kepala Tukang 0.0600 OH Rp 150,000.00 Rp 9,000.00
Mandor 0.0100 OH Rp 175,000.00 Rp 1,750.00
L. INDEKS HARGA SATUAN PEKERJAAN KUNCI DAN KACA ........... ( PT. T-30.2000-C )
L.001 1 Buah Pasang kunci Tanam Antik Rp 184,000.00 Rp 89,025.00 Rp 273,025.00
Bahan
Kunci Tanam Antik 1.0000 Bh Rp 184,000.00 Rp 184,000.00
Tenaga
Pekerja 0.0600 OH Rp 75,000.00 Rp 4,500.00
Tukang 0.6000 OH Rp 125,000.00 Rp 75,000.00
Kepala Tukang 0.0600 OH Rp 150,000.00 Rp 9,000.00
Mandor 0.0030 OH Rp 175,000.00 Rp 525.00
L.003 1 Buah Pasang kunci Tanam Kamar Mandi Rp 169,000.00 Rp 64,062.50 Rp 233,062.50
Bahan
Kunci Tanam Kamar Mandi 1.0000 Bh Rp 169,000.00 Rp 169,000.00
Tenaga
Pekerja 0.0050 OH Rp 75,000.00 Rp 375.00
Tukang 0.5000 OH Rp 125,000.00 Rp 62,500.00
Kepala Tukang 0.0050 OH Rp 150,000.00 Rp 750.00
Mandor 0.0025 OH Rp 175,000.00 Rp 437.50
L.006 1 Buah Pasang Engsel Jendela Kupu - kupu Rp 27,000.00 Rp 14,837.50 Rp 41,837.50
Bahan
Engsel Jendela 3" 1.0000 Bh Rp 27,000.00 Rp 27,000.00
Tenaga
Pekerja 0.0100 OH Rp 75,000.00 Rp 750.00
Tukang 0.1000 OH Rp 125,000.00 Rp 12,500.00
Kepala Tukang 0.0100 OH Rp 150,000.00 Rp 1,500.00
Mandor 0.0005 OH Rp 175,000.00 Rp 87.50
L.013 1 Buah Pasang Pegangan Pintu / Door Holder #N/A Rp 74,187.50 #N/A
Bahan
Door Holder 1.0000 Bh #N/A #N/A
Tenaga
Pekerja 0.0500 OH Rp 75,000.00 Rp 3,750.00
M.002 6.5 Memasang 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm dan 6 mm Rp 34,087.50 Rp 22,375.00 Rp 56,462.50
Bahan
Triplek 4 mm 0.3750 Lembar Rp 88,700.00 Rp 33,262.50
Paku tripleks 0.0300 kg Rp 27,500.00 Rp 825.00
Tenaga
Pekerja 0.1000 OH Rp 75,000.00 Rp 7,500.00
Tukang 0.1000 OH Rp 125,000.00 Rp 12,500.00
Kepala Tukang 0.0100 OH Rp 150,000.00 Rp 1,500.00
Mandor 0.0050 OH Rp 175,000.00 Rp 875.00
M.003 6.7 Memasang 1 m2 langit-langit gypsum board ukuran (120 x 240 x 9) mm, tebal 9 mm Rp 30,854.80 Rp 15,375.00 Rp 46,229.80
Bahan
Gypsum board (120 x 240 x 0,9) cm 0.3640 Lembar Rp 75,700.00 Rp 27,554.80
Paku Sekrup 0.1100 kg Rp 30,000.00 Rp 3,300.00
Tenaga
Pekerja 0.1000 OH Rp 75,000.00 Rp 7,500.00
Tukang 0.0500 OH Rp 125,000.00 Rp 6,250.00
Kepala Tukang 0.0050 OH Rp 150,000.00 Rp 750.00
Mandor 0.0050 OH Rp 175,000.00 Rp 875.00
M.004 6.8 Memasang 1 m2 langit-langit gypsum board ukuran (60 x 120) cm + rangka alluminium Rp 344,025.00 Rp 111,875.00 Rp 455,900.00
Bahan
Profil Alluminium "T" 3.6000 m’ Rp 77,500.00 Rp 279,000.00
Kawat diameter 4 mm 0.1500 kg Rp 30,300.00 Rp 4,545.00
Ramset 1.0500 Buah Rp 30,600.00 Rp 32,130.00
Gypsum board (60 x 120 x 0,9) cm 1.5000 Lembar Rp 18,900.00 Rp 28,350.00
Tenaga
Pekerja 0.5000 OH Rp 75,000.00 Rp 37,500.00
Tukang 0.5000 OH Rp 125,000.00 Rp 62,500.00
Kepala Tukang 0.0500 OH Rp 150,000.00 Rp 7,500.00
Mandor 0.0250 OH Rp 175,000.00 Rp 4,375.00
M.005 6.9 Memasang 1 m’ list langit-langit kayu profil Rp 10,245.00 Rp 11,275.00 Rp 21,520.00
Bahan
List Kayu Profil 5 cm 1.0500 m’ Rp 9,500.00 Rp 9,975.00
Paku Campur 0.0100 kg Rp 27,000.00 Rp 270.00
Tenaga
Pekerja 0.0500 OH Rp 75,000.00 Rp 3,750.00
Tukang 0.0500 OH Rp 125,000.00 Rp 6,250.00
Kepala Tukang 0.0050 OH Rp 150,000.00 Rp 750.00
Mandor 0.0030 OH Rp 175,000.00 Rp 525.00
M.006 6.9 Memasang 1 m’ list langit-langit dari gypsum Rp 38,835.00 Rp 11,275.00 Rp 50,110.00
Bahan
List gypsum type profil 10 cm 1.0500 m’ Rp 36,700.00 Rp 38,535.00
Paku Sekrup 0.0100 kg Rp 30,000.00 Rp 300.00
Tenaga
Pekerja 0.0500 OH Rp 75,000.00 Rp 3,750.00
Tukang 0.0500 OH Rp 125,000.00 Rp 6,250.00
Kepala Tukang 0.0050 OH Rp 150,000.00 Rp 750.00
Mandor 0.0030 OH Rp 175,000.00 Rp 525.00
M.007 6.5 Memasang 1 m2 langit-langit Heksa board ukuran (120 x 240) cm, tebal 6 mm Rp 31,312.50 Rp 22,375.00 Rp 53,687.50
Bahan
Heksa board (120 x 240 x 0,6) cm 0.3750 Lembar Rp 81,300.00 Rp 30,487.50
Paku tripleks 0.0300 kg Rp 27,500.00 Rp 825.00
Tenaga
Pekerja 0.1000 OH Rp 75,000.00 Rp 7,500.00
Tukang 0.1000 OH Rp 125,000.00 Rp 12,500.00
Kepala Tukang 0.0100 OH Rp 150,000.00 Rp 1,500.00
Mandor 0.0050 OH Rp 175,000.00 Rp 875.00
M.008 6.7 Memasang 1 m2 langit-langit GRC board ukuran (120 x 240) cm, tebal 9 mm Rp 67,000.00 Rp 15,375.00 Rp 82,375.00
Bahan
GRC board (120 x 240 x 0,9) cm 0.3640 Lembar Rp 175,000.00 Rp 63,700.00
Paku Sekrup 0.1100 kg Rp 30,000.00 Rp 3,300.00
Tenaga
Pekerja 0.1000 OH Rp 75,000.00 Rp 7,500.00
Tukang 0.0500 OH Rp 125,000.00 Rp 6,250.00
Kepala Tukang 0.0050 OH Rp 150,000.00 Rp 750.00
Mandor 0.0050 OH Rp 175,000.00 Rp 875.00
M.009 6.8 Memasang 1 m2 langit-langit Heksa board ukuran (60 x 120 x 0,6) cm + rangka alluminium Rp 346,125.00 Rp 111,875.00 Rp 458,000.00
Bahan
Profil Alluminium "T" 3.6000 m’ Rp 77,500.00 Rp 279,000.00
Kawat diameter 4 mm 0.1500 kg Rp 30,300.00 Rp 4,545.00
Ramset 1.0500 Buah Rp 30,600.00 Rp 32,130.00
Heksa board (60 x 120 x 0,6) cm 1.5000 Lembar Rp 20,300.00 Rp 30,450.00
Tenaga
Pekerja 0.5000 OH Rp 75,000.00 Rp 37,500.00
Tukang 0.5000 OH Rp 125,000.00 Rp 62,500.00
Kepala Tukang 0.0500 OH Rp 150,000.00 Rp 7,500.00
Mandor 0.0250 OH Rp 175,000.00 Rp 4,375.00
M.010 6.8 Memasang 1 m2 langit-langit GRC board ukuran (60 x 120 x 0,9) cm + rangka alluminium Rp 381,225.00 Rp 111,875.00 Rp 493,100.00
Bahan
Profil Alluminium "T" 3.6000 m’ Rp 77,500.00 Rp 279,000.00
Kawat diameter 4 mm 0.1500 kg Rp 30,300.00 Rp 4,545.00
Ramset 1.0500 Buah Rp 30,600.00 Rp 32,130.00
GRC board (60 x 120 x 0,9) cm 1.5000 Lembar Rp 43,700.00 Rp 65,550.00
Tenaga
Pekerja 0.5000 OH Rp 75,000.00 Rp 37,500.00
Tukang 0.5000 OH Rp 125,000.00 Rp 62,500.00
Kepala Tukang 0.0500 OH Rp 150,000.00 Rp 7,500.00
Mandor 0.0250 OH Rp 175,000.00 Rp 4,375.00
M.011 6.8 Memasang 1 m2 langit-langit Heksa board ukuran (60 x 120 x 0,6) cm + Rangka Besi Hollow/Galvanis Rp 142,005.00 Rp 111,875.00 Rp 253,880.00
Bahan
Besi Hollo/Galvanis 3.6000 m' Rp 20,800.00 Rp 74,880.00
Kawat diameter 4 mm 0.1500 kg Rp 30,300.00 Rp 4,545.00
Ramset 1.0500 Buah Rp 30,600.00 Rp 32,130.00
Heksa board (60 x 120 x 0,6) cm 1.5000 Lembar Rp 20,300.00 Rp 30,450.00
Tenaga
Pekerja 0.5000 OH Rp 75,000.00 Rp 37,500.00
Tukang 0.5000 OH Rp 125,000.00 Rp 62,500.00
Kepala Tukang 0.0500 OH Rp 150,000.00 Rp 7,500.00
Mandor 0.0250 OH Rp 175,000.00 Rp 4,375.00
M.012 6.8 Memasang 1 m2 langit-langit gypsum board ukuran (60 x 120 x 0,9) cm + Rangka Besi Hollow/Galvanis Rp 139,905.00 Rp 111,875.00 Rp 251,780.00
Bahan
Besi Hollo/Galvanis 3.6000 m' Rp 20,800.00 Rp 74,880.00
Kawat diameter 4 mm 0.1500 kg Rp 30,300.00 Rp 4,545.00
Ramset 1.0500 Buah Rp 30,600.00 Rp 32,130.00
Gypsum board (60 x 120 x 0,9) cm 1.5000 Lembar Rp 18,900.00 Rp 28,350.00
Tenaga
Pekerja 0.5000 OH Rp 75,000.00 Rp 37,500.00
Tukang 0.5000 OH Rp 125,000.00 Rp 62,500.00
Kepala Tukang 0.0500 OH Rp 150,000.00 Rp 7,500.00
Mandor 0.0250 OH Rp 175,000.00 Rp 4,375.00
M.013 6.8 Memasang 1 m2 langit-langit GRC board ukuran (60 x 120 x 0,9) cm + Rangka Besi Hollow/Galvanis Rp 177,105.00 Rp 111,875.00 Rp 288,980.00
Bahan
Besi Hollo/Galvanis 3.6000 m' Rp 20,800.00 Rp 74,880.00
Kawat diameter 4 mm 0.1500 kg Rp 30,300.00 Rp 4,545.00
Ramset 1.0500 Buah Rp 30,600.00 Rp 32,130.00
GRC board (60 x 120 x 0,9) cm 1.5000 Lembar Rp 43,700.00 Rp 65,550.00
Tenaga
Pekerja 0.5000 OH Rp 75,000.00 Rp 37,500.00
Tukang 0.5000 OH Rp 125,000.00 Rp 62,500.00
Kepala Tukang 0.0500 OH Rp 150,000.00 Rp 7,500.00
Mandor 0.0250 OH Rp 175,000.00 Rp 4,375.00
M.014 6.13 Memasang 1 m² Langit - langit Plywood 4 mm + Rangka Kayu Borneo Kls.II #N/A Rp 59,875.00 #N/A
Bahan
M.015 6.13 Memasang 1 m² Langit - langit Teakwood 4 mm + Rangka Kayu Borneo Kls.II Rp 133,254.00 Rp 59,875.00 Rp 193,129.00
Bahan
Kayu kelas II 0.0120 m3 Rp 3,160,000.00 Rp 37,920.00
Paku uk. 5 cm - 12 cm 0.0600 Kg Rp 21,400.00 Rp 1,284.00
Teakwood tbl. 4 mm 1.1000 lbr Rp 85,500.00 Rp 94,050.00
Tenaga
Pekerja 0.1800 OH Rp 75,000.00 Rp 13,500.00
Tukang 0.3200 OH Rp 125,000.00 Rp 40,000.00
Kepala Tukang 0.0320 OH Rp 150,000.00 Rp 4,800.00
Mandor 0.0090 OH Rp 175,000.00 Rp 1,575.00
M.016 6.13 Memasang 1 m² Langit - langit Tripleks 4 mm + Rangka Kayu Borneo Kls.II Rp 136,774.00 Rp 59,875.00 Rp 196,649.00
Bahan
Kayu kelas II 0.0120 m3 Rp 3,160,000.00 Rp 37,920.00
Paku uk. 5 cm - 12 cm 0.0600 Kg Rp 21,400.00 Rp 1,284.00
Triplek 4 mm 1.1000 lbr Rp 88,700.00 Rp 97,570.00
Tenaga
Pekerja 0.1800 OH Rp 75,000.00 Rp 13,500.00
Tukang 0.3200 OH Rp 125,000.00 Rp 40,000.00
Kepala Tukang 0.0320 OH Rp 150,000.00 Rp 4,800.00
Mandor 0.0090 OH Rp 175,000.00 Rp 1,575.00
N.010 Memasang 1 m’ talang datar/ jurai seng bjls 25 lebar 90 cm Rp 137,461.00 Rp 70,500.00 Rp 207,961.00
Bahan
Zink Plat 3" x 6" BJLS 25 1.0500 m’ Rp 73,400.00 Rp 77,070.00
Paku uk. 1 cm - 4 cm 0.0150 kg Rp 23,400.00 Rp 351.00
Papan kayu kelas II 0.0190 m3 Rp 3,160,000.00 Rp 60,040.00
Tenaga
Pekerja 0.2000 OH Rp 75,000.00 Rp 15,000.00
Tukang 0.4000 OH Rp 125,000.00 Rp 50,000.00
Kepala Tukang 0.0250 OH Rp 150,000.00 Rp 3,750.00
Mandor 0.0100 OH Rp 175,000.00 Rp 1,750.00
No.
NO. JENIS PEKERJAAN SAT. HRG. SAT. ( Rp )
Anls.
1 2 3 4 5
H. INDEKS HARGA SATUAN PEKERJAAN PENUTUP LANTAI & DINDING ........... ( SNI DT 91 -0012-2007 )
1 H.001 6.36 Memasang 1 m2 lantai keramik ukuran (20 x 20) cm m² Rp 241,345.00
2 H.002 6.37 Memasang 1 m2 lantai keramik warna uk. (20 x 25) cm m² Rp 245,345.00
3 H.003 6.35 Memasang 1 m2 lantai keramik warna uk. (30 x 30) cm m² Rp 250,925.00
4 H.004 6.35 Memasang 1 m2 lantai keramik warna uk. (40 x 40) cm m² Rp 206,581.00
5 H.005 6.35 Memasang 1 m2 lantai keramik warna uk. (50 x 50) cm m² Rp 384,081.00
6 H.006 6.35 Memasang 1 m2 lantai keramik warna uk. (60 x 60) cm m² Rp 315,477.00
7 H.007 6.54 Memasang 1 m2 dinding keramik warna uk. (20 x 20) cm m² Rp 269,355.00
8 H.008 6.54b Memasang 1 m2 dinding keramik warna uk. (20 x 25) cm m² Rp 273,355.00
NO. URAIAN KOEF SAT HRG.SAT. matrial HRG.SAT. upah JML.HRG. matrial JML.HRG. upah TOTAL harga
A B C D E F G=(CxE) H = (C x F ) I=(G+H)
A.002 RSNI. T-15-2002 ; 1 m² Pembuatan Gudang Semen dan Alat - alat Rp 872,980.00 Rp 363,750.00 Rp 1,236,730.00
Bahan :
Dolken kayu galam φ (8–10) cm 1.7000 btg Rp 49,600.00 Rp 84,320.00
Kayu Kelas II 0.2100 m3 Rp 3,160,000.00 Rp 663,600.00
Paku Campur 0.3000 Kg Rp 27,000.00 Rp 8,100.00
Semen Portland (PC) 10.5000 Kg Rp 1,620.00 Rp 17,010.00
Pasir Beton (PB) 0.0300 m3 Rp 250,000.00 Rp 7,500.00
Kerikil Beton (KB) 0.0500 m3 Rp 292,000.00 Rp 14,600.00
Zink gelombang bjls 0,20 1.5000 lbr Rp 51,900.00 Rp 77,850.00
Tenaga :
Pekerja 1.0000 OH Rp 75,000.00 Rp 75,000.00
Tukang 2.0000 OH Rp 125,000.00 Rp 250,000.00
Kepala Tukang 0.2000 OH Rp 150,000.00 Rp 30,000.00
Mandor 0.0500 OH Rp 175,000.00 Rp 8,750.00
B.003 6.9 Mengurug kembali 1 m3 galian (dihitung dari 1/3 kali dari indeks pekerjaan galian) Rp - Rp 20,208.33 Rp 20,208.33
Bahan :
Alat Bantu 0.0000 Ls Rp 1,000.00 Rp -
Tenaga :
Pekerja 0.2500 OH Rp 75,000.00 Rp 18,750.00
Mandor 0.0083 OH Rp 175,000.00 Rp 1,458.33
B.006 6.15 Mengurug 1 m3 sirtu padat untuk peninggian lantai bangunan Rp 362,400.00 Rp 23,125.00 Rp 385,525.00
Bahan :
Tanah Sirtu 1.2000 m3 Rp 302,000.00 Rp 362,400.00
Tenaga :
Pekerja 0.2500 OH Rp 75,000.00 Rp 18,750.00
Mandor 0.0250 OH Rp 175,000.00 Rp 4,375.00
B.007 (1 M3) Timbunan Koral/Bt. Karang/Bt. Belah (berat Min. 40 Kg) Rp 300,000.00 Rp 46,250.00 Rp 346,250.00
Bahan :
Batu Karang Belah (BKB) 1.2000 M3 Rp 250,000.00 Rp 300,000.00
Tenaga :
Pekerja 0.5000 OH Rp 75,000.00 Rp 37,500.00
Mandor 0.0500 OH Rp 175,000.00 Rp 8,750.00
C.002 6.3 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 5 PP Rp 656,320.00 Rp 230,625.00 Rp 886,945.00
Bahan :
Batu Besar (BB) 1.2000 m3 Rp 250,000.00 Rp 300,000.00
Semen Portland (PC) 136.0000 kg Rp 1,620.00 Rp 220,320.00
Pasir Pasangan (PP) 0.5440 m3 Rp 250,000.00 Rp 136,000.00
Tenaga :
Pekerja 1.5000 OH Rp 75,000.00 Rp 112,500.00
Tukang 0.7500 OH Rp 125,000.00 Rp 93,750.00
Kepala Tukang 0.0750 OH Rp 150,000.00 Rp 11,250.00
Mandor 0.0750 OH Rp 175,000.00 Rp 13,125.00
C.004 6.10 Memasang 1 m3 pondasi siklop, 60% beton cmp. 1 PC : 2 PB : 3 KR dan 40% batu belah Rp 2,437,326.00 Rp 403,750.00 Rp 2,841,076.00
Bahan
Batu Besar (BB) 0.4800 m3 Rp 250,000.00 Rp 120,000.00
Semen Portland (PC) 194.0000 kg Rp 1,620.00 Rp 314,280.00
Pasir Pasangan (PP) 0.3120 m3 Rp 250,000.00 Rp 78,000.00
Kerikil Beton (KB) 0.4680 m3 Rp 292,000.00 Rp 136,656.00
Besi Beton (polos/ulir) 126.0000 kg Rp 13,895.00 Rp 1,750,770.00
Kawat Beton (bendrat) 1.8000 kg Rp 20,900.00 Rp 37,620.00
Tenaga
Pekerja 3.4000 OH Rp 75,000.00 Rp 255,000.00
Tukang 0.8500 OH Rp 125,000.00 Rp 106,250.00
Kepala Tukang 0.0850 OH Rp 150,000.00 Rp 12,750.00
Mandor 0.1700 OH Rp 175,000.00 Rp 29,750.00
C.005 6.11 Memasang 1 m3 pondasi sumuran, diameter 100 cm Rp 641,436.00 Rp 312,825.00 Rp 954,261.00
Bahan
Batu Besar (BB) 0.4500 m3 Rp 250,000.00 Rp 112,500.00
Semen Portland (PC) 194.0000 kg Rp 1,620.00 Rp 314,280.00
Pasir Pasangan (PP) 0.3120 m3 Rp 250,000.00 Rp 78,000.00
Kerikil Beton (KB) 0.4680 m3 Rp 292,000.00 Rp 136,656.00
Tenaga
Pekerja 2.4000 OH Rp 75,000.00 Rp 180,000.00
Tukang 0.8000 OH Rp 125,000.00 Rp 100,000.00
Kepala Tukang 0.0800 OH Rp 150,000.00 Rp 12,000.00
Mandor 0.1190 OH Rp 175,000.00 Rp 20,825.00
D.002 6.9 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 4 PP Rp 169,380.00 Rp 39,125.00 Rp 208,505.00
Bahan
Bata Merah uk. (22 x 11 x 5) 70.0000 Buah Rp 2,000.00 Rp 140,000.00
Semen Portland (PC) 11.5000 kg Rp 1,620.00 Rp 18,630.00
Pasir Pasangan (PP) 0.0430 m3 Rp 250,000.00 Rp 10,750.00
Tenaga
Pekerja 0.3000 OH Rp 75,000.00 Rp 22,500.00
Tukang 0.1000 OH Rp 125,000.00 Rp 12,500.00
Kepala Tukang 0.0100 OH Rp 150,000.00 Rp 1,500.00
Mandor 0.0150 OH Rp 175,000.00 Rp 2,625.00
D.003 6.10 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 5 PP Rp 166,931.60 Rp 39,125.00 Rp 206,056.60
Bahan
Bata Merah uk. (22 x 11 x 5) 70.0000 Buah Rp 2,000.00 Rp 140,000.00
Semen Portland (PC) 9.6800 kg Rp 1,620.00 Rp 15,681.60
Pasir Pasangan (PP) 0.0450 m3 Rp 250,000.00 Rp 11,250.00
Tenaga
Pekerja 0.3000 OH Rp 75,000.00 Rp 22,500.00
Tukang 0.1000 OH Rp 125,000.00 Rp 12,500.00
Kepala Tukang 0.0100 OH Rp 150,000.00 Rp 1,500.00
Mandor 0.0150 OH Rp 175,000.00 Rp 2,625.00
F.002 RSNI. T-15-2002 ; Memasang 1 m' Pipa PVC tipe D Ø 3/4" Rp 14,400.00 Rp 11,415.00 Rp 25,815.00
Bahan
Pipa PVC Tipe-D dia 3/4" 1.2000 m' Rp 12,000.00 Rp 14,400.00
Tenaga
Pekerja 0.0360 OH Rp 75,000.00 Rp 2,700.00
Tukang 0.0600 OH Rp 125,000.00 Rp 7,500.00
Kepala Tukang 0.0060 OH Rp 150,000.00 Rp 900.00
Mandor 0.0018 OH Rp 175,000.00 Rp 315.00
F.003 RSNI. T-15-2002 ; Memasang 1 m' Pipa PVC tipe D Ø 1" Rp 16,800.00 Rp 11,415.00 Rp 28,215.00
Bahan
Pipa PVC Tipe-D dia 1" 1.2000 m' Rp 14,000.00 Rp 16,800.00
Tenaga
Pekerja 0.0360 OH Rp 75,000.00 Rp 2,700.00
Tukang 0.0600 OH Rp 125,000.00 Rp 7,500.00
Kepala Tukang 0.0060 OH Rp 150,000.00 Rp 900.00
Mandor 0.0018 OH Rp 175,000.00 Rp 315.00
F.004 RSNI. T-15-2002 ; Memasang 1 m' Pipa PVC tipe D Ø 1,5" Rp 18,900.00 Rp 11,415.00 Rp 30,315.00
Bahan
Pipa PVC Tipe-D dia 1,5" 1.2000 m' Rp 15,750.00 Rp 18,900.00
Tenaga
Pekerja 0.0360 OH Rp 75,000.00 Rp 2,700.00
Tukang 0.0600 OH Rp 125,000.00 Rp 7,500.00
Kepala Tukang 0.0060 OH Rp 150,000.00 Rp 900.00
Mandor 0.0018 OH Rp 175,000.00 Rp 315.00
F.005 RSNI. T-15-2002 ; Memasang 1 m' Pipa PVC tipe D Ø 2" Rp 21,000.00 Rp 17,122.50 Rp 38,122.50
Bahan
Pipa PVC Tipe-D dia 2" 1.2000 m' Rp 17,500.00 Rp 21,000.00
Tenaga
Pekerja 0.0540 OH Rp 75,000.00 Rp 4,050.00
Tukang 0.0900 OH Rp 125,000.00 Rp 11,250.00
Kepala Tukang 0.0090 OH Rp 150,000.00 Rp 1,350.00
Mandor 0.0027 OH Rp 175,000.00 Rp 472.50
F.006 RSNI. T-15-2002 ; Memasang 1 m' Pipa PVC tipe D Ø 3" Rp 48,000.00 Rp 25,692.50 Rp 73,692.50
Bahan
Pipa PVC Tipe-D dia 3" 1.2000 m' Rp 40,000.00 Rp 48,000.00
Tenaga
Pekerja 0.0810 OH Rp 75,000.00 Rp 6,075.00
Tukang 0.1350 OH Rp 125,000.00 Rp 16,875.00
Kepala Tukang 0.0135 OH Rp 150,000.00 Rp 2,025.00
Mandor 0.0041 OH Rp 175,000.00 Rp 717.50
F.007 RSNI. T-15-2002 ; Memasang 1 m' Pipa PVC tipe D Ø 4" Rp 61,800.00 Rp 25,692.50 Rp 87,492.50
Bahan
Pipa PVC Tipe-D dia 4" 1.2000 m' Rp 51,500.00 Rp 61,800.00
Tenaga
Pekerja 0.0810 OH Rp 75,000.00 Rp 6,075.00
Tukang 0.1350 OH Rp 125,000.00 Rp 16,875.00
Kepala Tukang 0.0135 OH Rp 150,000.00 Rp 2,025.00
Mandor 0.0041 OH Rp 175,000.00 Rp 717.50
G.002 6.2 Membuat 1 m3 beton mutu f’c = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,78 Rp 828,918.99 Rp 176,850.00 Rp 1,005,768.99
Bahan
Semen Portland (PC) 276.00 kg Rp 1,620.00 Rp 447,120.00
Pasir Beton (PB) 828.00 kg Rp 178.57 Rp 147,857.14
Kerikil Beton (KB) 1012.00 kg Rp 216.30 Rp 218,891.85
Air Kerja 215.00 Liter Rp 70.00 Rp 15,050.00
Tenaga
Pekerja 1.6500 OH Rp 75,000.00 Rp 123,750.00
Tukang 0.2750 OH Rp 125,000.00 Rp 34,375.00
Kepala Tukang 0.0280 OH Rp 150,000.00 Rp 4,200.00
Mandor 0.0830 OH Rp 175,000.00 Rp 14,525.00
G.003 6.3 Membuat 1 m3 beton mutu f’c = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = 0,72 Rp 862,081.90 Rp 176,850.00 Rp 1,038,931.90
Bahan
Semen Portland (PC) 299.00 kg Rp 1,620.00 Rp 484,380.00
Pasir Beton (PB) 799.00 kg Rp 178.57 Rp 142,678.57
Kerikil Beton (KB) 1017.00 kg Rp 216.30 Rp 219,973.33
Air Kerja 215.00 Liter Rp 70.00 Rp 15,050.00
Tenaga
Pekerja 1.6500 OH Rp 75,000.00 Rp 123,750.00
Tukang 0.2750 OH Rp 125,000.00 Rp 34,375.00
Kepala Tukang 0.0280 OH Rp 150,000.00 Rp 4,200.00
Mandor 0.0830 OH Rp 175,000.00 Rp 14,525.00
G.004 6.5 Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66 Rp 901,453.17 Rp 176,850.00 Rp 1,078,303.17
Bahan
Semen Portland (PC) 326.00 kg Rp 1,620.00 Rp 528,120.00
G.005 6.6 Membuat 1 m3 beton mutu f’c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,61 Rp 938,827.20 Rp 176,850.00 Rp 1,115,677.20
Bahan
Semen Portland (PC) 352.00 kg Rp 1,620.00 Rp 570,240.00
Pasir Beton (PB) 731.00 kg Rp 178.57 Rp 130,535.71
Kerikil Beton (KB) 1031.00 kg Rp 216.30 Rp 223,001.48
Air Kerja 215.00 Liter Rp 70.00 Rp 15,050.00
Tenaga
Pekerja 1.6500 OH Rp 75,000.00 Rp 123,750.00
Tukang 0.2750 OH Rp 125,000.00 Rp 34,375.00
Kepala Tukang 0.0280 OH Rp 150,000.00 Rp 4,200.00
Mandor 0.0830 OH Rp 175,000.00 Rp 14,525.00
G.006 6.7 Membuat 1 m3 beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58 Rp 967,175.08 Rp 176,850.00 Rp 1,144,025.08
Bahan
Semen Portland (PC) 371.00 kg Rp 1,620.00 Rp 601,020.00
Pasir Beton (PB) 698.00 kg Rp 178.57 Rp 124,642.86
Kerikil Beton (KB) 1047.00 kg Rp 216.30 Rp 226,462.22
Air Kerja 215.00 Liter Rp 70.00 Rp 15,050.00
Tenaga
Pekerja 1.6500 OH Rp 75,000.00 Rp 123,750.00
Tukang 0.2750 OH Rp 125,000.00 Rp 34,375.00
Kepala Tukang 0.0280 OH Rp 150,000.00 Rp 4,200.00
Mandor 0.0830 OH Rp 175,000.00 Rp 14,525.00
G.007 6.8 Membuat 1 m3 beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56 Rp 985,433.28 Rp 176,850.00 Rp 1,162,283.28
Bahan
Semen Portland (PC) 384.00 kg Rp 1,620.00 Rp 622,080.00
Pasir Beton (PB) 692.00 kg Rp 178.57 Rp 123,571.43
Kerikil Beton (KB) 1039.00 kg Rp 216.30 Rp 224,731.85
Air Kerja 215.00 Liter Rp 70.00 Rp 15,050.00
Tenaga
Pekerja 1.6500 OH Rp 75,000.00 Rp 123,750.00
Tukang 0.2750 OH Rp 125,000.00 Rp 34,375.00
Kepala Tukang 0.0280 OH Rp 150,000.00 Rp 4,200.00
Mandor 0.0830 OH Rp 175,000.00 Rp 14,525.00
G.008 6.9 Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = 0,53 Rp 1,016,832.86 Rp 176,850.00 Rp 1,193,682.86
Bahan
Semen Portland (PC) 406.00 kg Rp 1,620.00 Rp 657,720.00
Pasir Beton (PB) 684.00 kg Rp 178.57 Rp 122,142.86
Kerikil Beton (KB) 1026.00 kg Rp 216.30 Rp 221,920.00
Air Kerja 215.00 Liter Rp 70.00 Rp 15,050.00
Tenaga
Pekerja 1.6500 OH Rp 75,000.00 Rp 123,750.00
Tukang 0.2750 OH Rp 125,000.00 Rp 34,375.00
Kepala Tukang 0.0280 OH Rp 150,000.00 Rp 4,200.00
Mandor 0.0830 OH Rp 175,000.00 Rp 14,525.00
G.009 6.10 Membuat 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,52 Rp 1,026,555.66 Rp 176,850.00 Rp 1,203,405.66
Bahan
Semen Portland (PC) 413.00 kg Rp 1,620.00 Rp 669,060.00
Pasir Beton (PB) 681.00 kg Rp 178.57 Rp 121,607.14
Kerikil Beton (KB) 1021.00 kg Rp 216.30 Rp 220,838.52
Air Kerja 215.00 Liter Rp 70.00 Rp 15,050.00
Tenaga
Pekerja 1.6500 OH Rp 75,000.00 Rp 123,750.00
Tukang 0.2750 OH Rp 125,000.00 Rp 34,375.00
Kepala Tukang 0.0280 OH Rp 150,000.00 Rp 4,200.00
Mandor 0.0830 OH Rp 175,000.00 Rp 14,525.00
G.010 6.11 Membuat 1 m3 beton mutu f’c = 28,8 MPa (K 325), slump (12 ± 2) cm, w/c = 0,49 Rp 1,063,466.93 Rp 224,875.00 Rp 1,288,341.93
Bahan
Semen Portland (PC) 439.00 kg Rp 1,620.00 Rp 711,180.00
Pasir Beton (PB) 670.00 kg Rp 178.57 Rp 119,642.86
Kerikil Beton (KB) 1006.00 kg Rp 216.30 Rp 217,594.07
Air Kerja 215.00 Liter Rp 70.00 Rp 15,050.00
Tenaga
Pekerja 2.1000 OH Rp 75,000.00 Rp 157,500.00
Tukang 0.3500 OH Rp 125,000.00 Rp 43,750.00
Kepala Tukang 0.0350 OH Rp 150,000.00 Rp 5,250.00
Mandor 0.1050 OH Rp 175,000.00 Rp 18,375.00
G.011 6.12 Membuat 1 m3 beton mutu f’c = 31,2 MPa (K 350), slump (12 ± 2) cm, w/c = 0,48 Rp 1,076,213.44 Rp 224,875.00 Rp 1,301,088.44
Bahan
Semen Portland (PC) 448.00 kg Rp 1,620.00 Rp 725,760.00
Pasir Beton (PB) 667.00 kg Rp 178.57 Rp 119,107.14
Kerikil Beton (KB) 1000.00 kg Rp 216.30 Rp 216,296.30
Air Kerja 215.00 Liter Rp 70.00 Rp 15,050.00
Tenaga
G.012 6.17 Pembesian 1 kg dengan besi polos atau besi ulir Rp 14,903.25 Rp 1,575.00 Rp 16,478.25
Bahan
Besi Beton (polos/ulir) 1.0500 kg Rp 13,895.00 Rp 14,589.75
Kawat Beton (bendrat) 0.0150 kg Rp 20,900.00 Rp 313.50
Tenaga
Pekerja 0.0070 OH Rp 75,000.00 Rp 525.00
Tukang 0.0070 OH Rp 125,000.00 Rp 875.00
Kepala Tukang 0.0007 OH Rp 150,000.00 Rp 105.00
Mandor 0.0004 OH Rp 175,000.00 Rp 70.00
G.013 6.19 Memasang 1 kg jaring kawat baja/wire mesh Rp 18,770.50 Rp 892.50 Rp 19,663.00
Bahan
Jaring Kawat Baja di las/Wire Mesh 1.0200 kg Rp 18,300.00 Rp 18,666.00
Kawat Beton (bendrat) 0.0050 kg Rp 20,900.00 Rp 104.50
Tenaga
Pekerja 0.0025 OH Rp 75,000.00 Rp 187.50
Tukang 0.0025 OH Rp 125,000.00 Rp 312.50
Kepala Tukang 0.0025 OH Rp 150,000.00 Rp 375.00
Mandor 0.0001 OH Rp 175,000.00 Rp 17.50
Tenaga :
Upah Kerja (10% hrg. Bahan) 0.1000 OH Rp 39,500.00 Rp 3,950.00
G.027 An.Tek ; Membuat 1 m3 Beton Sikloop K-175, (60% beton cmp. 1 PC : 2 PB : 3 KR dan 40% batu belah) Rp 864,028.80 Rp 1,000.00 Rp 865,028.80
Bahan :
Cor Beton Site Mix K-175 1.0000 M3 Rp 744,028.80 Rp 744,028.80
Batu Karang Belah (BKB) 1.2000 M3 Rp 100,000.00 Rp 120,000.00
Tenaga :
Alat Bantu 1.0000 Ls Rp 1,000.00 Rp 1,000.00
H. INDEKS HARGA SATUAN PEKERJAAN PENUTUP LANTAI & DINDING ........... ( SNI DT 91 -0012-2007 )
H.001 6.36 Memasang 1 m2 lantai keramik ukuran (20 x 20) cm Rp 133,720.00 Rp 107,625.00 Rp 241,345.00
Bahan
Keramik 20 x 20 cm [warna] 26.5000 Buah Rp 2,879.25 Rp 76,300.00
Semen Portland (PC) 10.4000 kg Rp 1,620.00 Rp 16,848.00
Pasir Pasangan (PP) 0.0450 m3 Rp 250,000.00 Rp 11,250.00
Semen Warna 1.6200 kg Rp 18,100.00 Rp 29,322.00
Tenaga
Pekerja 0.7000 OH Rp 75,000.00 Rp 52,500.00
Tukang 0.3500 OH Rp 125,000.00 Rp 43,750.00
Kepala Tukang 0.0350 OH Rp 150,000.00 Rp 5,250.00
Mandor 0.0350 OH Rp 175,000.00 Rp 6,125.00
H.002 6.37 Memasang 1 m2 lantai keramik warna uk. (20 x 25) cm Rp 137,720.00 Rp 107,625.00 Rp 245,345.00
Bahan
Keramik 20 x 25 cm [warna] 21.2000 Buah Rp 3,787.74 Rp 80,300.00
Semen Portland (PC) 10.4000 kg Rp 1,620.00 Rp 16,848.00
Pasir Pasangan (PP) 0.0450 m3 Rp 250,000.00 Rp 11,250.00
Semen Warna 1.6200 kg Rp 18,100.00 Rp 29,322.00
Tenaga
Pekerja 0.7000 OH Rp 75,000.00 Rp 52,500.00
Tukang 0.3500 OH Rp 125,000.00 Rp 43,750.00
Kepala Tukang 0.0350 OH Rp 150,000.00 Rp 5,250.00
Mandor 0.0350 OH Rp 175,000.00 Rp 6,125.00
H.003 6.35 Memasang 1 m2 lantai keramik warna uk. (30 x 30) cm Rp 143,300.00 Rp 107,625.00 Rp 250,925.00
Bahan
Keramik 30 x 30 cm [warna] 11.8700 Buah Rp 7,472.62 Rp 88,700.00
Semen Portland (PC) 10.0000 kg Rp 1,620.00 Rp 16,200.00
Pasir Pasangan (PP) 0.0450 m3 Rp 250,000.00 Rp 11,250.00
Semen Warna 1.5000 kg Rp 18,100.00 Rp 27,150.00
Tenaga
Pekerja 0.7000 OH Rp 75,000.00 Rp 52,500.00
Tukang 0.3500 OH Rp 125,000.00 Rp 43,750.00
Kepala Tukang 0.0350 OH Rp 150,000.00 Rp 5,250.00
Mandor 0.0350 OH Rp 175,000.00 Rp 6,125.00
H.004 6.35 Memasang 1 m2 lantai keramik warna uk. (40 x 40) cm Rp 98,956.00 Rp 107,625.00 Rp 206,581.00
Bahan
Keramik 40 x 40 cm [warna] 6.6300 Buah Rp 7,285.07 Rp 48,300.00
Semen Portland (PC) 9.8000 kg Rp 1,620.00 Rp 15,876.00
Pasir Pasangan (PP) 0.0450 m3 Rp 250,000.00 Rp 11,250.00
Semen Warna 1.3000 kg Rp 18,100.00 Rp 23,530.00
Tenaga
Pekerja 0.7000 OH Rp 75,000.00 Rp 52,500.00
Tukang 0.3500 OH Rp 125,000.00 Rp 43,750.00
Kepala Tukang 0.0350 OH Rp 150,000.00 Rp 5,250.00
Mandor 0.0350 OH Rp 175,000.00 Rp 6,125.00
H.005 6.35 Memasang 1 m2 lantai keramik warna uk. (50 x 50) cm Rp 276,456.00 Rp 107,625.00 Rp 384,081.00
Bahan
Keramik 50 x 50 cm [warna] 4.2432 Buah Rp 53,214.56 Rp 225,800.00
Semen Portland (PC) 9.8000 kg Rp 1,620.00 Rp 15,876.00
Pasir Pasangan (PP) 0.0450 m3 Rp 250,000.00 Rp 11,250.00
Semen Warna 1.3000 kg Rp 18,100.00 Rp 23,530.00
Tenaga
Pekerja 0.7000 OH Rp 75,000.00 Rp 52,500.00
Tukang 0.3500 OH Rp 125,000.00 Rp 43,750.00
Kepala Tukang 0.0350 OH Rp 150,000.00 Rp 5,250.00
Mandor 0.0350 OH Rp 175,000.00 Rp 6,125.00
H.006 6.35 Memasang 1 m2 lantai keramik warna uk. (60 x 60) cm Rp 207,852.00 Rp 107,625.00 Rp 315,477.00
Bahan
Keramik 60 x 60 cm [warna] 3.1000 Buah Rp 49,645.16 Rp 153,900.00
Semen Portland (PC) 9.6000 kg Rp 1,620.00 Rp 15,552.00
Pasir Pasangan (PP) 0.0450 m3 Rp 250,000.00 Rp 11,250.00
Semen Warna 1.5000 kg Rp 18,100.00 Rp 27,150.00
Tenaga
Pekerja 0.7000 OH Rp 75,000.00 Rp 52,500.00
Tukang 0.3500 OH Rp 125,000.00 Rp 43,750.00
Kepala Tukang 0.0350 OH Rp 150,000.00 Rp 5,250.00
Mandor 0.0350 OH Rp 175,000.00 Rp 6,125.00
H.007 6.54 Memasang 1 m2 dinding keramik warna uk. (20 x 20) cm Rp 130,980.00 Rp 138,375.00 Rp 269,355.00
Bahan
Keramik 20 x 20 cm [warna] 26.5000 Buah Rp 2,879.25 Rp 76,300.00
Semen Portland (PC) 9.3000 kg Rp 1,620.00 Rp 15,066.00
H.008 6.54b Memasang 1 m2 dinding keramik warna uk. (20 x 25) cm Rp 134,980.00 Rp 138,375.00 Rp 273,355.00
Bahan
Keramik 20 x 25 cm [warna] 21.2000 Buah Rp 3,787.74 Rp 80,300.00
Semen Portland (PC) 9.3000 kg Rp 1,620.00 Rp 15,066.00
Pasir Pasangan (PP) 0.0180 m3 Rp 250,000.00 Rp 4,500.00
Semen Warna 1.9400 kg Rp 18,100.00 Rp 35,114.00
Tenaga
Pekerja 0.9000 OH Rp 75,000.00 Rp 67,500.00
Tukang 0.4500 OH Rp 125,000.00 Rp 56,250.00
Kepala Tukang 0.0450 OH Rp 150,000.00 Rp 6,750.00
Mandor 0.0450 OH Rp 175,000.00 Rp 7,875.00
I.002 1 m² Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 3 Lapis Cat Penutup Rp 35,349.00 Rp 19,412.50 Rp 54,761.50
Bahan
Cat Meni 0.2000 Kg Rp 39,500.00 Rp 7,900.00
Plamir 0.1500 Kg Rp 8,700.00 Rp 1,305.00
Cat Dasar 0.1700 Kg Rp 28,200.00 Rp 4,794.00
Cat Kayu Glotex 0.3500 Kg Rp 61,000.00 Rp 21,350.00
Tenaga
Pekerja 0.0700 OH Rp 75,000.00 Rp 5,250.00
Tukang 0.1050 OH Rp 125,000.00 Rp 13,125.00
Kepala Tukang 0.0040 OH Rp 150,000.00 Rp 600.00
Mandor 0.0025 OH Rp 175,000.00 Rp 437.50
I.003 1 m² Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup ) Rp 12,790.00 Rp 10,757.50 Rp 23,547.50
Bahan
Plamir 0.1000 Kg Rp 8,700.00 Rp 870.00
Cat Dasar 0.1000 Kg Rp 28,200.00 Rp 2,820.00
Cat Tembok [metrolite Weathershield] 0.2600 Kg Rp 35,000.00 Rp 9,100.00
Tenaga
Pekerja 0.0200 OH Rp 75,000.00 Rp 1,500.00
Tukang 0.0630 OH Rp 125,000.00 Rp 7,875.00
Kepala Tukang 0.0063 OH Rp 150,000.00 Rp 945.00
Mandor 0.0025 OH Rp 175,000.00 Rp 437.50
I.004 1 m² Pengecatan Tembok Lama ( 1 Lapis Cat Dasar, 2 Lapis Cat Penutup ) Rp 9,684.00 Rp 8,417.50 Rp 18,101.50
Bahan
Cat Dasar 0.1200 Kg Rp 28,200.00 Rp 3,384.00
Cat Tembok [metrolite Weathershield] 0.1800 Kg Rp 35,000.00 Rp 6,300.00
Tenaga
Pekerja 0.0280 OH Rp 75,000.00 Rp 2,100.00
Tukang 0.0420 OH Rp 125,000.00 Rp 5,250.00
Kepala Tukang 0.0042 OH Rp 150,000.00 Rp 630.00
Mandor 0.0025 OH Rp 175,000.00 Rp 437.50
I.005 1 m² Pengecatan Langit-langit Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup ) Rp 12,790.00 Rp 10,757.50 Rp 23,547.50
Bahan
Plamir 0.1000 Kg Rp 8,700.00 Rp 870.00
Cat Dasar 0.1000 Kg Rp 28,200.00 Rp 2,820.00
Cat Tembok [metrolite Weathershield] 0.2600 Kg Rp 35,000.00 Rp 9,100.00
Tenaga
Pekerja 0.0200 OH Rp 75,000.00 Rp 1,500.00
Tukang 0.0630 OH Rp 125,000.00 Rp 7,875.00
Kepala Tukang 0.0063 OH Rp 150,000.00 Rp 945.00
Mandor 0.0025 OH Rp 175,000.00 Rp 437.50
J.002 Memasang 1 buah Bak Fiberglass volume 1,00 m³ air Rp 141,000.00 Rp 1,080,000.00 Rp 1,221,000.00
Bahan
Bak Mandi Fiberglass (kav. 1,00 m3) 1.0000 bh Rp 140,000.00 Rp 140,000.00
Perlengkapan 1.0000 ls Rp 1,000.00 Rp 1,000.00
Tenaga
Pekerja 3.0000 OH Rp 75,000.00 Rp 225,000.00
Tukang 4.5000 OH Rp 125,000.00 Rp 562,500.00
Kepala Tukang 0.9000 OH Rp 150,000.00 Rp 135,000.00
Mandor 0.9000 OH Rp 175,000.00 Rp 157,500.00
K.002 6.5 Membuat dan memasang 1 m2 daun pintu panel, kayu kelas I atau II Rp 401,150.00 Rp 503,750.00 Rp 904,900.00
Bahan
Papan Kayu Kelas I 0.0400 m3 Rp 7,910,000.00 Rp 316,400.00
Lem kayu 0.5000 kg Rp 169,500.00 Rp 84,750.00
Tenaga
Pekerja 1.0000 OH Rp 75,000.00 Rp 75,000.00
Tukang 3.0000 OH Rp 125,000.00 Rp 375,000.00
Kepala Tukang 0.3000 OH Rp 150,000.00 Rp 45,000.00
Mandor 0.0500 OH Rp 175,000.00 Rp 8,750.00
ENGINEER ESTIMATE ( EE )
Unit Kerja : IAIN AMBON
Pekerjaan : PEMBANGUNAN KONSTRUKSI PENAHAN TEBING DARI BRONJONG (GABION)
Lokasi : IAIN - AMBON
Tahun Anggaran : 2018
Halaman 2 dari 3 Halaman
Hrg. Satuan Jml. Harga Total Harga
No. Uraian Pekerjaan Kode Volume Satuan
(Rp) (Rp) (Rp)
Sub Total - F.1. : Pekerjaan Cut And Fill & Talud 924,631,060.35
F2. PEKERJAAN TALUD PENAHAN TANAH / RIPRAP
1 Galian Tanah Talud (Riprap) B.002 316.89 m3 86,681.00 27,468,342.09
2 Urugan Tanah Kembali B.009 79.22 m3 53,187.00 4,213,607.11
3 Pasir Urug alas Pondasi Talud tebal 10 cm B.011 22.64 m3 372,887.00 8,440,297.25
4 Pasangan Talud ad. 1 : 5 (Batu Karang Gunung) C.003 705.49 m3 1,019,986.00 719,587,556.77
5 Pekerjaan Beton Bertulang ad. 1pc : 2ps : 3kr
- Beton Poer (Foot Plate) 100x100, K-250 (87,20 kg/m3) BT.14a 5.80 m3 3,556,200.00 20,625,960.00
- Beton Kolom Poer 20/20 cm, K-250 (167,99 kg/m3) BT.23 1.62 m3 9,433,400.00 15,319,841.60
- Beton Sloof 15/25 cm, K-250 (163,23 kg/m3) BT.17 5.66 m3 6,085,400.00 34,435,757.25
- Beton Kolom 20/20 cm, K-250 (167,99 kg/m3) BT.23 2.78 m3 9,433,400.00 26,262,585.60
- Balok Ring Beton 15/25 cm, K-250 (163,23 kg/m3) BT.30 5.66 m3 7,741,200.00 43,805,515.50
6 Plesteran Dinding Talud ad. 1 : 4 G.004 671.51 m2 71,568.00 48,058,269.84
TOTAL Rp 139,538,322.00
PPN 10% Rp 13,953,832.20
GRAND TOTAL Rp 153,492,154.20
DIBULATKAN Rp 153,490,000.00
SERATUS LIMA PULUH TIGA JUTA EMPAT RATUS SEMBILAN PULUH RIBU RUPIAH,-
*) Interpolasi Berdasarkan Tabel E1,
Kepmen PU No. 45/PRT/M/2007, Tanggal 27 Desember 2007
Hal. - 56
RENCANA ANGGARAN BIAYA
PEMBANGUNAN KONSTRUKSI PENAHAN TEBING DARI BRONJONG (GABION)
SATKER : IAIN AMBON
PAKET PEKERJAA : PEMBANGUNAN KONSTRUKSI PENAHAN TEBING DARI BRONJONG (GABION)
LOKASI : IAIN - AMBON
THN. ANGGARAN : 2018
1. Pasangan Bronjong kawat Q 3 mm diisi batu belah, Sisi Belakang Gedung, C.009 53.00 m³ 1,245,289.00 66,000,317.00 Rp 66,000,317.00
STAGE 2
(Sepanjang ; 53 M') dua trap
2. Pasangan Bronjong kawat Q 3 mm diisi batu belah, Sisi Samping Gedung, C.009 45.00 m³ 1,245,289.00 56,038,005.00 Rp 56,038,005.00
Sub Total B.1 : PEK. KONSTRUKSI PENAHAN TEBING DARI BRONJONG (GABION) Rp122,038,322.00
Total Harga - B : PEKERJAAN STRUKTUR Rp122,038,322.00
Hal. - 57
Harga Satuan Pekerjaan (HSP)
Dengan Menggunakan Index Standar Nasional Indonesia
BIDANG CIPTA KARYA TAHUN 2013
1 2 3 4
No. URAIAN PEKERJAAN KODE SATUAN KOOFISIEN HRG. SATUAN (Rp.) JML. HARGA (Rp.)
A. TENAGA
Pekerja L.01 Oh 0.200 75,000.00 15,000.00
Tukang L.02 Oh 0.400 125,000.00 50,000.00
Kepala Tukang L.03 Oh 0.020 150,000.00 3,000.00
Mandor L.04 Oh 0.020 175,000.00 3,500.00
Jumlah Tenaga Kerja 71,500.00
B. BAHAN
Dolken Kayu Galam φ (8–10) cm batang 1.250 49,600.00 62,000.00
Semen Portland (PC) Kg 2.500 1,620.00 4,050.00
Zink Gelombang Bjls 0,20 lbr 1.200 51,900.00 62,280.00
Pasir Beton (PB) m3 0.005 250,000.00 1,250.00
Kerikil Beton (KB) m3 0.009 292,000.00 2,628.00
Kayu Kelas II m3 0.072 3,160,000.00 227,520.00
Paku Campur kg 0.060 27,000.00 1,620.00
Meni besi liter 0.400 28,200.00 11,280.00
Jumlah Harga Bahan 372,628.00
C. PERALATAN
A.002 Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter 226,938.00
No. URAIAN PEKERJAAN KODE SATUAN KOOFISIEN HRG. SATUAN (Rp.) JML. HARGA (Rp.)
A. TENAGA
Pekerja L.01 Oh 0.200 75,000.00 15,000.00
Tukang L.02 Oh 0.300 125,000.00 37,500.00
Kepala Tukang L.03 Oh 0.020 150,000.00 3,000.00
Mandor L.04 Oh 0.020 175,000.00 3,500.00
Jumlah Tenaga Kerja 59,000.00
B. BAHAN
Dolken Kayu Galam φ (8–10) cm batang 1.000 49,600.00 49,600.00
Semen Portland (PC) Kg 2.000 1,620.00 3,240.00
Kawat Duri m' 25.000 3,200.00 80,000.00
Pasir Beton (PB) m3 0.005 250,000.00 1,250.00
Kerikil Beton (KB) m3 0.009 292,000.00 2,628.00
Paku Campur kg 0.060 27,000.00 1,620.00
Jumlah Harga Bahan 138,338.00
C. PERALATAN
No. URAIAN PEKERJAAN KODE SATUAN KOOFISIEN HRG. SATUAN (Rp.) JML. HARGA (Rp.)
A. TENAGA
Pekerja L.01 Oh 0.100 75,000.00 7,500.00
Tukang L.02 Oh 0.100 125,000.00 12,500.00
Kepala Tukang L.03 Oh 0.010 150,000.00 1,500.00
Mandor L.04 Oh 0.005 175,000.00 875.00
Analisa_2013 59
Jumlah Tenaga Kerja 22,375.00
B. BAHAN
Kayu Kelas III m3 0.120 2,030,000.00 243,600.00
Paku Campur kg 0.020 27,000.00 540.00
Papan Kayu Kelas III m3 0.007 2,030,000.00 14,210.00
Jumlah Harga Bahan 258,350.00
C. PERALATAN
No. URAIAN PEKERJAAN KODE SATUAN KOOFISIEN HRG. SATUAN (Rp.) JML. HARGA (Rp.)
A. TENAGA
Pekerja HU.013 Oh 2.000 75,000.00 150,000.00
Tukang Kayu HU.009 Oh 2.000 125,000.00 250,000.00
Tukang Batu HU.008 Oh 1.000 125,000.00 125,000.00
Kepala Tukang HU.002 Oh 0.300 150,000.00 45,000.00
Mandor HU.001 Oh 0.050 175,000.00 8,750.00
Jumlah Tenaga Kerja 578,750.00
B. BAHAN
Dolken Kayu Galam φ (8–10) cm HB.015 batang 1.250 49,600.00 62,000.00
Kayu Kelas II HB.011 m3 0.180 3,160,000.00 568,800.00
Paku Campur HC.008 kg 0.080 27,000.00 2,160.00
Besi strip HC.026 kg 1.100 16,200.00 17,820.00
Semen Portland (PC) HB.002 kg 35.000 1,620.00 56,700.00
Pasir Pasangan (PP) HB.006 m3 0.150 250,000.00 37,500.00
Pasir Beton (PB) HB.007 m3 0.100 250,000.00 25,000.00
Kerikil Beton (KB) HB.005 m3 0.150 292,000.00 43,800.00
Batu Bata uk. 23 x 12 x 8 HB.021 bh 28.000 1,800.00 50,400.00
Zink Plat 3" x 6" BJLS 20 HB.029 lbr 0.250 56,500.00 14,125.00
Jendela nako (rangka + kaca 5 mm) HD.050 bh 0.200 148,000.00 29,600.00
Kaca Polos 5 mm HD.025 m2 0.080 219,000.00 17,520.00
Kunci tanam biasa (union asli) HD.002 bh 0.150 107,000.00 16,050.00
Triplek 4 mm HB.059 lbr 0.060 88,700.00 5,322.00
Jumlah Harga Bahan 946,797.00
C. PERALATAN
No. URAIAN PEKERJAAN KODE SATUAN KOOFISIEN HRG. SATUAN (Rp.) JML. HARGA (Rp.)
A. TENAGA
Pekerja L.01 Oh 1.000 75,000.00 75,000.00
Tukang Kayu L.02 Oh 2.000 125,000.00 250,000.00
Kepala Tukang L.03 Oh 0.200 150,000.00 30,000.00
Mandor L.04 Oh 0.050 175,000.00 8,750.00
Jumlah Tenaga Kerja 363,750.00
B. BAHAN
Dolken Kayu Galam φ (8–10) cm batang 1.700 49,600.00 84,320.00
Kayu Kelas II m3 0.210 3,160,000.00 663,600.00
Paku Campur kg 0.300 27,000.00 8,100.00
Semen Portland (PC) kg 10.500 1,620.00 17,010.00
Pasir Beton (PB) m3 0.030 250,000.00 7,500.00
Kerikil Beton (KB) m3 0.050 292,000.00 14,600.00
Zink Gelombang Bjls 0,20 lbr 1.500 51,900.00 77,850.00
Zink Plat 3" x 6" BJLS 20 lbr 0.250 56,500.00 14,125.00
Jumlah Harga Bahan 887,105.00
C. PERALATAN
Analisa_2013 60
D. JUMLAH ( A + B + C ) 1,250,855.00
E. Overhead dan Profit_15% 15% x D 187,628.25
P
F. Harga Suatu pekerjaan ( D + E ) 1,438,483.25 N
No. URAIAN PEKERJAAN KODE SATUAN KOOFISIEN HRG. SATUAN (Rp.) JML. HARGA (Rp.)
A. TENAGA
Pekerja L.01 Oh 1.000 75,000.00 75,000.00
Tukang Kayu L.02 Oh 2.000 125,000.00 250,000.00
Kepala Tukang L.03 Oh 0.200 150,000.00 30,000.00
Mandor L.04 Oh 0.050 175,000.00 8,750.00
Jumlah Tenaga Kerja 363,750.00
B. BAHAN
Dolken Kayu Galam φ (8–10) cm batang 1.250 49,600.00 62,000.00
Kayu Kelas II m3 0.186 3,160,000.00 587,760.00
Paku Campur kg 0.300 27,000.00 8,100.00
Semen Portland (PC) kg 18.000 1,620.00 29,160.00
Pasir Beton (PB) m3 0.030 250,000.00 7,500.00
Kerikil Beton (KB) m3 0.050 292,000.00 14,600.00
Zink Gelombang Bjls 0,20 lbr 1.500 51,900.00 77,850.00
Triplek 4 mm lbr 1.350 88,700.00 119,745.00
Jumlah Harga Bahan 906,715.00
C. PERALATAN
No. URAIAN PEKERJAAN KODE SATUAN KOOFISIEN HRG. SATUAN (Rp.) JML. HARGA (Rp.)
A. TENAGA
Pekerja L.01 Oh 0.100 75,000.00 7,500.00
Mandor L.04 Oh 0.050 175,000.00 8,750.00
Jumlah Tenaga Kerja 16,250.00
B. BAHAN
No. URAIAN PEKERJAAN KODE SATUAN KOOFISIEN HRG. SATUAN (Rp.) JML. HARGA (Rp.)
A. TENAGA
Pekerja L.01 Oh 1.000 75,000.00 75,000.00
Mandor L.04 Oh 0.005 175,000.00 875.00
Jumlah Tenaga Kerja 75,875.00
B. BAHAN
Batu Karang Belah (BKB) m3 0.150 250,000.00 37,500.00
Kerikil Beton (KB) m3 0.090 292,000.00 26,280.00
Pasir Pasangan (PP) m3 0.010 250,000.00 2,500.00
Jumlah Harga Bahan 66,280.00
C. PERALATAN
Analisa_2013 61
No. URAIAN PEKERJAAN KODE SATUAN KOOFISIEN HRG. SATUAN (Rp.) JML. HARGA (Rp.)
A. TENAGA
Pekerja L.01 Oh 13.334 75,000.00 1,000,050.00
Mandor L.04 Oh 0.666 175,000.00 116,550.00
Jumlah Tenaga Kerja 1,116,600.00
B. BAHAN
No. URAIAN PEKERJAAN KODE SATUAN KOOFISIEN HRG. SATUAN (Rp.) JML. HARGA (Rp.)
A. TENAGA
Pekerja L.01 Oh 6.667 75,000.00 500,025.00
Mandor L.04 Oh 0.333 175,000.00 58,275.00
Jumlah Tenaga Kerja 558,300.00
B. BAHAN
No. URAIAN PEKERJAAN KODE SATUAN KOOFISIEN HRG. SATUAN (Rp.) JML. HARGA (Rp.)
A. TENAGA
Pekerja L.01 Oh 0.042 75,000.00 3,150.00
Tukang Kayu L.02 Oh 0.004 125,000.00 500.00
Kepala Tukang L.03 Oh 0.002 150,000.00 300.00
Mandor L.04 Oh 0.042 175,000.00 7,350.00
Jumlah Tenaga Kerja 11,300.00
B. BAHAN
Kawat bronjong 3 mm (uk. 1m x 2m x 0,5m') lbr 0.143 372,900.00 53,473.86
Jumlah Harga Bahan 53,473.86
C. PERALATAN
No. URAIAN PEKERJAAN KODE SATUAN KOOFISIEN HRG. SATUAN (Rp.) JML. HARGA (Rp.)
A. TENAGA
Pekerja L.01 Oh 0.750 75,000.00 56,250.00
Mandor L.04 Oh 0.025 175,000.00 4,375.00
Jumlah Tenaga Kerja 60,625.00
B. BAHAN
No. URAIAN PEKERJAAN KODE SATUAN KOOFISIEN HRG. SATUAN (Rp.) JML. HARGA (Rp.)
A. TENAGA
Pekerja L.01 Oh 0.900 75,000.00 67,500.00
Mandor L.04 Oh 0.045 175,000.00 7,875.00
Jumlah Tenaga Kerja 75,375.00
B. BAHAN
No. URAIAN PEKERJAAN KODE SATUAN KOOFISIEN HRG. SATUAN (Rp.) JML. HARGA (Rp.)
A. TENAGA
Pekerja L.01 Oh 1.050 75,000.00 78,750.00
Mandor L.04 Oh 0.067 175,000.00 11,725.00
Jumlah Tenaga Kerja 90,475.00
B. BAHAN
No. URAIAN PEKERJAAN KODE SATUAN KOOFISIEN HRG. SATUAN (Rp.) JML. HARGA (Rp.)
A. TENAGA
Pekerja L.01 Oh 1.000 75,000.00 75,000.00
Mandor L.04 Oh 0.032 175,000.00 5,600.00
Jumlah Tenaga Kerja 80,600.00
B. BAHAN
No. URAIAN PEKERJAAN KODE SATUAN KOOFISIEN HRG. SATUAN (Rp.) JML. HARGA (Rp.)
A. TENAGA
Pekerja L.01 Oh 1.500 75,000.00 112,500.00
Mandor L.04 Oh 0.060 175,000.00 10,500.00
Jumlah Tenaga Kerja 123,000.00
B. BAHAN
Analisa_2013 63
D. JUMLAH ( A + B + C ) 123,000.00
E. Overhead dan Profit_15% 15% x D 18,450.00
P
F. Harga Suatu pekerjaan ( D + E ) 141,450.00 N
No. URAIAN PEKERJAAN KODE SATUAN KOOFISIEN HRG. SATUAN (Rp.) JML. HARGA (Rp.)
A. TENAGA
Pekerja L.01 Oh 1.200 75,000.00 90,000.00
Mandor L.04 Oh 0.045 175,000.00 7,875.00
Jumlah Tenaga Kerja 97,875.00
B. BAHAN
No. URAIAN PEKERJAAN KODE SATUAN KOOFISIEN HRG. SATUAN (Rp.) JML. HARGA (Rp.)
A. TENAGA
Pekerja L.01 Oh 0.050 75,000.00 3,750.00
Mandor L.04 Oh 0.005 175,000.00 875.00
Jumlah Tenaga Kerja 4,625.00
B. BAHAN
No. URAIAN PEKERJAAN KODE SATUAN KOOFISIEN HRG. SATUAN (Rp.) JML. HARGA (Rp.)
A. TENAGA
Pekerja L.01 Oh 0.330 75,000.00 24,750.00
Mandor L.04 Oh 0.010 175,000.00 1,750.00
Jumlah Tenaga Kerja 26,500.00
B. BAHAN
No. URAIAN PEKERJAAN KODE SATUAN KOOFISIEN HRG. SATUAN (Rp.) JML. HARGA (Rp.)
A. TENAGA
Pekerja L.01 Oh 0.500 75,000.00 37,500.00
Mandor L.04 Oh 0.050 175,000.00 8,750.00
Jumlah Tenaga Kerja 46,250.00
B. BAHAN
Analisa_2013 64
Jumlah Harga Alat -
D. JUMLAH ( A + B + C ) 46,250.00
E. Overhead dan Profit_15% 15% x D 6,937.50
P
F. Harga Suatu pekerjaan ( D + E ) 53,187.50 N
No. URAIAN PEKERJAAN KODE SATUAN KOOFISIEN HRG. SATUAN (Rp.) JML. HARGA (Rp.)
A. TENAGA
Pekerja L.01 Oh 0.500 75,000.00 37,500.00
Mandor L.04 Oh 0.050 175,000.00 8,750.00
Jumlah Tenaga Kerja 46,250.00
B. BAHAN
No. URAIAN PEKERJAAN KODE SATUAN KOOFISIEN HRG. SATUAN (Rp.) JML. HARGA (Rp.)
A. TENAGA
Pekerja L.01 Oh 0.300 75,000.00 22,500.00
Mandor L.04 Oh 0.010 175,000.00 1,750.00
Jumlah Tenaga Kerja 24,250.00
B. BAHAN
Pasir Urugan (PU) m3 1.200 250,000.00 300,000.00
No. URAIAN PEKERJAAN KODE SATUAN KOOFISIEN HRG. SATUAN (Rp.) JML. HARGA (Rp.)
A. TENAGA
Pekerja L.01 Oh 0.150 75,000.00 11,250.00
Mandor L.04 Oh 0.015 175,000.00 2,625.00
Jumlah Tenaga Kerja 13,875.00
B. BAHAN
Lapisan Ijuk m3 6.000 33,900.00 203,400.00
No. URAIAN PEKERJAAN KODE SATUAN KOOFISIEN HRG. SATUAN (Rp.) JML. HARGA (Rp.)
A. TENAGA
Pekerja L.01 Oh 0.250 75,000.00 18,750.00
Mandor L.04 Oh 0.025 175,000.00 4,375.00
Jumlah Tenaga Kerja 23,125.00
B. BAHAN
Tanah Timbunan Biasa m3 1.200 150,000.00 180,000.00
Analisa_2013 65
Jumlah Harga Bahan 180,000.00
C. PERALATAN
No. URAIAN PEKERJAAN KODE SATUAN KOOFISIEN HRG. SATUAN (Rp.) JML. HARGA (Rp.)
A. TENAGA
Pekerja L.01 Oh 1.500 75,000.00 112,500.00
Tukang L.02 Oh 0.750 125,000.00 93,750.00
Kepala Tukang L.03 Oh 0.075 150,000.00 11,250.00
Mandor L.04 Oh 0.075 175,000.00 13,125.00
Jumlah Tenaga Kerja 230,625.00
B. BAHAN
Batu Besar (BB) m3 1.200 250,000.00 300,000.00
Semen Portland (PC) kg 202.000 1,620.00 327,240.00
Pasir Pasangan (PP) m3 0.485 250,000.00 121,250.00
Jumlah Harga Bahan 748,490.00
C. PERALATAN
No. URAIAN PEKERJAAN KODE SATUAN KOOFISIEN HRG. SATUAN (Rp.) JML. HARGA (Rp.)
A. TENAGA
Pekerja L.01 Oh 1.500 75,000.00 112,500.00
Tukang L.02 Oh 0.750 125,000.00 93,750.00
Kepala Tukang L.03 Oh 0.075 150,000.00 11,250.00
Mandor L.04 Oh 0.075 175,000.00 13,125.00
Jumlah Tenaga Kerja 230,625.00
B. BAHAN
Batu Besar (BB) m3 1.200 250,000.00 300,000.00
Semen Portland (PC) kg 163.000 1,620.00 264,060.00
Pasir Pasangan (PP) m3 0.520 250,000.00 130,000.00
Jumlah Harga Bahan 694,060.00
C. PERALATAN
No. URAIAN PEKERJAAN KODE SATUAN KOOFISIEN HRG. SATUAN (Rp.) JML. HARGA (Rp.)
A. TENAGA
Pekerja L.01 Oh 1.500 75,000.00 112,500.00
Tukang L.02 Oh 0.750 125,000.00 93,750.00
Kepala Tukang L.03 Oh 0.075 150,000.00 11,250.00
Mandor L.04 Oh 0.075 175,000.00 13,125.00
Jumlah Tenaga Kerja 230,625.00
B. BAHAN
Batu Besar (BB) m3 1.200 250,000.00 300,000.00
Semen Portland (PC) kg 136.000 1,620.00 220,320.00
Pasir Pasangan (PP) m3 0.544 250,000.00 136,000.00
Jumlah Harga Bahan 656,320.00
C. PERALATAN
Analisa_2013 66
Jumlah Harga Alat -
D. JUMLAH ( A + B + C ) 886,945.00
E. Overhead dan Profit_15% 15% x D 133,041.75
P
F. Harga Suatu pekerjaan ( D + E ) 1,019,986.75 N
No. URAIAN PEKERJAAN KODE SATUAN KOOFISIEN HRG. SATUAN (Rp.) JML. HARGA (Rp.)
A. TENAGA
Pekerja L.01 Oh 1.500 75,000.00 112,500.00
Tukang L.02 Oh 0.750 125,000.00 93,750.00
Kepala Tukang L.03 Oh 0.075 150,000.00 11,250.00
Mandor L.04 Oh 0.075 175,000.00 13,125.00
Jumlah Tenaga Kerja 230,625.00
B. BAHAN
Batu Besar (BB) m3 1.200 250,000.00 300,000.00
Semen Portland (PC) kg 117.000 1,620.00 189,540.00
Pasir Pasangan (PP) m3 0.561 250,000.00 140,250.00
Jumlah Harga Bahan 629,790.00
C. PERALATAN
No. URAIAN PEKERJAAN KODE SATUAN KOOFISIEN HRG. SATUAN (Rp.) JML. HARGA (Rp.)
A. TENAGA
Pekerja L.01 Oh 0.780 75,000.00 58,500.00
Tukang L.02 Oh 0.390 125,000.00 48,750.00
Kepala Tukang L.03 Oh 0.039 150,000.00 5,850.00
Mandor L.04 Oh 0.039 175,000.00 6,825.00
Jumlah Tenaga Kerja 119,925.00
B. BAHAN
Batu Besar (BB) m3 1.200 250,000.00 300,000.00
Pasir Urugan (PU) m3 0.432 250,000.00 108,000.00
Jumlah Harga Bahan 408,000.00
C. PERALATAN
C.007 Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2 PB : 3 Kr dan 40% batu belah 3,267,237.00
No. URAIAN PEKERJAAN KODE SATUAN KOOFISIEN HRG. SATUAN (Rp.) JML. HARGA (Rp.)
A. TENAGA
Pekerja L.01 Oh 3.400 75,000.00 255,000.00
Tukang L.02 Oh 0.850 125,000.00 106,250.00
Kepala Tukang L.03 Oh 0.085 150,000.00 12,750.00
Mandor L.04 Oh 0.170 175,000.00 29,750.00
Jumlah Tenaga Kerja 403,750.00
B. BAHAN
Batu Besar (BB) m3 0.480 250,000.00 120,000.00
Semen Portland (PC) kg 194.000 1,620.00 314,280.00
Pasir Pasangan (PP) m3 0.312 250,000.00 78,000.00
Kerikil Beton (KB) m3 0.468 292,000.00 136,656.00
Besi Beton (polos/ulir) kg 126.000 13,895.00 1,750,770.00
Kawat Beton (bendrat) kg 1.800 20,900.00 37,620.00
Jumlah Harga Bahan 2,437,326.00
C. PERALATAN
Analisa_2013 67
D. JUMLAH ( A + B + C ) 2,841,076.00
E. Overhead dan Profit_15% 15% x D 426,161.40
P
F. Harga Suatu pekerjaan ( D + E ) 3,267,237.40 N
No. URAIAN PEKERJAAN KODE SATUAN KOOFISIEN HRG. SATUAN (Rp.) JML. HARGA (Rp.)
A. TENAGA
Pekerja L.01 Oh 2.400 75,000.00 180,000.00
Tukang L.02 Oh 0.800 125,000.00 100,000.00
Kepala Tukang L.03 Oh 0.080 150,000.00 12,000.00
Mandor L.04 Oh 0.119 175,000.00 20,825.00
Jumlah Tenaga Kerja 312,825.00
B. BAHAN
Batu Besar (BB) m3 0.450 250,000.00 112,500.00
Semen Portland (PC) kg 194.000 1,620.00 314,280.00
Pasir Pasangan (PP) m3 0.312 250,000.00 78,000.00
Kerikil Beton (KB) m3 0.468 292,000.00 136,656.00
Jumlah Harga Bahan 641,436.00
C. PERALATAN
C.009 An.SNI 2002 ; 1 M3 Pasangan Bronjong kawat Q 3 mm diisi batu belah 1,245,289.00
No. URAIAN PEKERJAAN KODE SATUAN KOOFISIEN HRG. SATUAN (Rp.) JML. HARGA (Rp.)
A. TENAGA
Pekerja L.01 Oh 1.500 75,000.00 112,500.00
Tukang L.02 Oh 0.200 125,000.00 25,000.00
Kepala Tukang L.03 Oh 0.020 150,000.00 3,000.00
Mandor L.04 Oh 0.020 175,000.00 3,500.00
Jumlah Tenaga Kerja 144,000.00
B. BAHAN
Batu Besar (BB) m3 1.200 250,000.00 300,000.00
Kawat Bronjong Q 3mm kg 18.000 29,700.00 534,600.00
Dolken Kayu Galam φ (8–10) cm BH 2.100 49,600.00 104,160.00
Jumlah Harga Bahan 938,760.00
C. PERALATAN Ls 1.000 100.00 100.00
Analisa_2013 68
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
A Tenaga
1 Pekerja Jam 0.0151 10,714.29 161.79
2 Mandor Jam 0.0076 25,000.00 189.00
B Bahan
C Peralatan
1 Excavator Jam 0.0076 564,000.00 4,263.84
2 Alat Bantu Ls 1.00 2,000.00 2,000.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
A Tenaga
1 Pekerja Jam 0.0403 10,714.29 431.79
2 Mandor Jam 0.0103 25,000.00 257.50
B Bahan
C Peralatan
1 Excavator Jam 0.0101 564,000.00 5,696.40
2 Motor Grader Jam 0.0037 466,000.00 1,724.20
3 Vibrator Roller Jam 0.0042 278,000.00 1,167.60
3 Alat Bantu Ls 1.0000 2,000.00 2,000.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Harga Satuan Pekerjaan Konstruksi Beton
Tahun Anggaran 2018
KODE HARGA +
NO. URAIAN HASIL ANALISA
Anls. KEUNTUNGAN
a b c d
1 Hasil Analisa Pekerjaan Cor Beton Site Mix K-100 D.001 Rp 1,107,793.00
2 Hasil Analisa Pekerjaan Cor Beton Site Mix K-125 D.002 Rp 1,156,634.00
3 Hasil Analisa Pekerjaan Cor Beton Site Mix K-150 D.003 Rp 1,194,771.00
4 Hasil Analisa Pekerjaan Cor Beton Site Mix K-100, lantai kerja D.004 Rp 1,031,205.00
5 Hasil Analisa Pekerjaan Cor Beton Site Mix K-175 D.005 Rp 1,240,048.00
6 Hasil Analisa Pekerjaan Cor Beton Site Mix K-200 D.006 Rp 1,283,028.00
7 Hasil Analisa Pekerjaan Cor Beton Site Mix K-225 D.007 Rp 1,315,628.00
8 Hasil Analisa Pekerjaan Cor Beton Site Mix K-250 D.008 Rp 1,336,625.00
9 Hasil Analisa Pekerjaan Cor Beton Site Mix K-275 D.009 Rp 1,372,735.00
10 Hasil Analisa Pekerjaan Cor Beton Site Mix K-300 D.010 Rp 1,383,916.00
11 Hasil Analisa Pekerjaan Cor Beton Site Mix K-325 D.011 Rp 1,481,593.00
12 Hasil Analisa Pekerjaan Cor Beton Site Mix K-350 D.012 Rp 1,496,251.00
13 Hasil Analisa Pekerjaan Besi Beton Polos/Ulir/U-24 D.013 Rp 18,949.00
14 Hasil Analisa Pekerjaan Sirm & Bongkar D.033 Rp 18,680.00
15 Hasil Analisa Pekerjaan Begisting Papan D.034 Rp 248,360.00
16 Hasil Analisa Pekerjaan Begisting Plywood 4 mm D.035 Rp 175,150.00
17 Hasil Analisa Pekerjaan Begisting Plywood 9 mm D.036 Rp 177,920.00
18 Hasil Analisa Pekerjaan Stoot Werk D.037 Rp 185,290.00
Analisa_Beton Halaman : 74
Perhitungan Beton Bertulang
Tahun Anggaran 2018
PENGUMPULAN :
PONDASI
PN1. BETON FOOT PLATE 150/150 x 25 CM (Besi ø16 -20 cm = 151,750 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 1,336,625.00 Rp 1,336,625.000
- Besi Beton (polos/ulir) 151.750 Kg Rp 18,949.00 Rp 2,875,503.569
- Begesting Papan (maks. 1 x pakai) 2.083 M2 Rp 248,360.00 Rp 517,416.667
Jumlah PN1. Rp 4,729,545.235
PN2. BETON FOOT PLATE 130/130 x 25 CM (Besi ø16 -20 cm = 153,431 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 1,336,625.00 Rp 1,336,625.000
- Besi Beton (polos/ulir) 153.431 Kg Rp 18,949.00 Rp 2,907,355.301
- Begesting Papan (maks. 1 x pakai) 2.188 M2 Rp 248,360.00 Rp 543,526.308
Jumlah PN2. Rp 4,787,506.608
PN3. BETON FOOT PLATE 100/100 x 25 CM (Besi ø12 -20 cm = 87,201 Kg/m3) K-200 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-200 1.000 M3 Rp 1,283,028.00 Rp 1,283,028.000
- Besi Beton (polos/ulir) 87.201 Kg Rp 18,949.00 Rp 1,652,365.458
- Begesting Papan (maks. 1 x pakai) 2.500 M2 Rp 248,360.00 Rp 620,900.000
Jumlah PN3. Rp 3,556,293.458
PN4. BETON FOOT PLATE 160/160 x 25 CM (Besi ø16 -20 cm = 151,217 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 1,336,625.00 Rp 1,336,625.000
- Besi Beton (polos/ulir) 151.217 Kg Rp 18,949.00 Rp 2,865,404.239
- Begesting Papan (maks. 1 x pakai) 2.050 M2 Rp 248,360.00 Rp 509,138.000
Jumlah PN4. Rp 4,711,167.239
BETON SLOOF
SL1. BETON SLOOF 20/30 CM (Besi 4ø16 + 6ø12 dan ø8 -15 cm = 184,953 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 1,336,625.00 Rp 1,336,625.000
- Besi Beton (polos/ulir) 184.953 Kg Rp 18,949.00 Rp 3,504,681.800
- Begesting Papan (maks. 1 x pakai) 10.000 M2 Rp 248,360.00 Rp 2,483,600.000
Jumlah SL1. Rp 7,324,906.800
SL2. BETON SLOOF 20/25 CM (Besi 8ø12 dan ø8 -15 cm = 141,087 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 1,336,625.00 Rp 1,336,625.000
- Besi Beton (polos/ulir) 141.087 Kg Rp 18,949.00 Rp 2,673,458.933
- Begesting Papan (maks. 1 x pakai) 5.000 M2 Rp 248,360.00 Rp 1,241,800.000
Jumlah SL2. Rp 5,251,883.933
SL3. BETON SLOOF 15/25 CM (Besi 4ø12, Besi 2ø12 dan ø8 -20 cm = 163,234 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 1,336,625.00 Rp 1,336,625.000
- Besi Beton (polos/ulir) 163.234 Kg Rp 18,949.00 Rp 3,093,128.416
- Begesting Papan (maks. 1 x pakai) 6.667 M2 Rp 248,360.00 Rp 1,655,733.333
Jumlah SL3. Rp 6,085,486.750
SL4. BETON SLOOF 15/20 CM (Besi 4ø12, Besi 2ø10 dan ø6 -15 cm = 155,204 Kg/m3) K-175 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-175 1.000 M3 Rp 1,240,048.00 Rp 1,240,048.000
- Besi Beton (polos/ulir) 155.204 Kg Rp 18,949.00 Rp 2,940,965.106
- Begesting Papan (maks. 1 x pakai) 6.667 M2 Rp 248,360.00 Rp 1,655,733.333
Jumlah SL4. Rp 5,836,746.439
SL5. BETON SLOOF 20/40 CM (Besi 8ø16 + 4ø12 dan ø8 -15 cm = 195,311 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 1,336,625.00 Rp 1,336,625.000
- Besi Beton (polos/ulir) 195.311 Kg Rp 18,949.00 Rp 3,700,957.491
- Begesting Papan (maks. 1 x pakai) 10.000 M2 Rp 248,360.00 Rp 2,483,600.000
Jumlah SL5. Rp 7,521,182.491
SL6. BETON SLOOF 30/50 CM (Besi 6ø16 + 3ø12 dan ø10 -15 cm = 113,728 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
Analisa_Beton Halaman : 75
Perhitungan Beton Bertulang
Tahun Anggaran 2018
BETON KOLOM
KL1. BETON KOLOM 50/50 CM (Besi 4ø19 + 8ø16 dan 2Pø10 -10/20 cm = 114,848 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 1,336,625.00 Rp 1,336,625.000
- Besi Beton (polos/ulir) 114.848 Kg Rp 18,949.00 Rp 2,176,260.153
- Begesting Papan (maks. 1 x pakai) 8.000 M2 Rp 248,360.00 Rp 1,986,880.000
Jumlah KL1. Rp 5,499,765.153
KL2. BETON KOLOM 30/30 CM (Besi 4ø16 + 4ø12 dan 2Pø10 -10/20 cm = 153,918 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 1,336,625.00 Rp 1,336,625.000
- Besi Beton (polos/ulir) 153.918 Kg Rp 18,949.00 Rp 2,916,588.331
- Begesting Papan (maks. 1 x pakai) 13.333 M2 Rp 248,360.00 Rp 3,311,466.667
Jumlah KL2. Rp 7,564,679.997
KL3. BETON KOLOM 20/40 CM (Besi 4ø16 + 2ø12 dan 2Pø10 -20 cm = 118,984 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 1,336,625.00 Rp 1,336,625.000
- Besi Beton (polos/ulir) 118.984 Kg Rp 18,949.00 Rp 2,254,628.043
- Begesting Papan (maks. 1 x pakai) 15.000 M2 Rp 248,360.00 Rp 3,725,400.000
Jumlah KL3. Rp 7,316,653.043
KL4. BETON KOLOM 25/25 CM (Besi 4ø12 + 4ø10 dan ø8 -15 cm = 104,613 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 1,336,625.00 Rp 1,336,625.000
- Besi Beton (polos/ulir) 113.256 Kg Rp 18,949.00 Rp 2,146,092.945
- Begesting Papan (maks. 1 x pakai) 16.000 M2 Rp 248,360.00 Rp 3,973,760.000
Jumlah KL4. Rp 7,456,477.945
KL5. BETON KOLOM 20/20 CM (Besi 4ø12 + 4ø10 dan ø8 -20 cm = 167,989 Kg/m3) K-200 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-200 1.000 M3 Rp 1,283,028.00 Rp 1,283,028.000
- Besi Beton (polos/ulir) 167.989 Kg Rp 18,949.00 Rp 3,183,218.430
- Begesting Papan (maks. 1 x pakai) 20.000 M2 Rp 248,360.00 Rp 4,967,200.000
Jumlah KL5. Rp 9,433,446.430
KL6. BETON KOLOM 15/15 CM (Besi 4ø12 dan ø6 -15 cm = 148,283 Kg/m3) K-175 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-175 1.000 M3 Rp 1,240,048.00 Rp 1,240,048.000
- Besi Beton (polos/ulir) 148.283 Kg Rp 18,949.00 Rp 2,809,807.274
- Begesting Papan (maks. 1 x pakai) 13.333 M2 Rp 248,360.00 Rp 3,311,466.667
Jumlah KL6. Rp 7,361,321.941
KL7. BETON KOLOM PRAKTIS 12/12 CM (Besi 4ø10 dan 2Pø6 -20 cm = 179,303 Kg/m3) K-200 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-175 1.000 M3 Rp 1,240,048.00 Rp 1,240,048.000
- Besi Beton (polos/ulir) 179.303 Kg Rp 18,949.00 Rp 3,397,604.566
- Begesting Papan (maks. 1 x pakai) 16.667 M2 Rp 248,360.00 Rp 4,139,333.333
Jumlah KL7. Rp 8,776,985.900
KL8. BETON KOLOM BULAT DIA. 50 CM (Besi 8ø16 cm dan 2Pø10 -10/20 cm = 83,685 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 1,336,625.00 Rp 1,336,625.000
- Besi Beton (polos/ulir) 83.685 Kg Rp 18,949.00 Rp 1,585,748.170
- Begesting Papan (maks. 1 x pakai) 8.000 M2 Rp 248,360.00 Rp 1,986,880.000
Jumlah KL8. Rp 4,909,253.170
KL17. BETON KOLOM 40/60 CM (Besi 4ø19 + 8ø16 dan 2Pø10 -10/20 cm = 119,549 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 1,336,625.00 Rp 1,336,625.000
- Besi Beton (polos/ulir) 119.549 Kg Rp 18,949.00 Rp 2,265,336.468
- Begesting Papan (maks. 1 x pakai) 8.333 M2 Rp 248,360.00 Rp 2,069,666.667
Analisa_Beton Halaman : 76
Perhitungan Beton Bertulang
Tahun Anggaran 2018
KL18. BETON KOLOM 50/60 CM (Besi 4ø19 + 10ø16 dan 2Pø10 -10/20 cm = 108,992 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 1,336,625.00 Rp 1,336,625.000
- Besi Beton (polos/ulir) 108.992 Kg Rp 18,949.00 Rp 2,065,282.156
- Begesting Papan (maks. 1 x pakai) 7.333 M2 Rp 248,360.00 Rp 1,821,306.667
Jumlah KL18. Rp 5,223,213.822
KL19. BETON KOLOM 60/60 CM (Besi 4ø19 + 12ø16 dan 2Pø10 -10/20 cm = 102,052 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 1,336,625.00 Rp 1,336,625.000
- Besi Beton (polos/ulir) 102.052 Kg Rp 18,949.00 Rp 1,933,782.860
- Begesting Papan (maks. 1 x pakai) 6.667 M2 Rp 248,360.00 Rp 1,655,733.333
Jumlah KL19. Rp 4,926,141.193
KL20. BETON KOLOM 30/50 CM (Besi 5ø16 + 5ø16 dan 2Pø10 -10/20 cm = 102,052 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 1,336,625.00 Rp 1,336,625.000
- Besi Beton (polos/ulir) 141.890 Kg Rp 18,949.00 Rp 2,688,678.426
- Begesting Papan (maks. 1 x pakai) 10.667 M2 Rp 248,360.00 Rp 2,649,173.333
Jumlah KL20. Rp 6,674,476.760
BETON BALOK
BL1. BETON BALOK 30/60 CM (Besi 8ø16 + 4ø12 dan 2Pø10 -10/20 cm = 124,813 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 1,336,625.00 Rp 1,336,625.000
- Besi Beton (polos/ulir) 124.813 Kg Rp 18,949.00 Rp 2,365,089.826
- Begesting Papan (maks. 1 x pakai) 8.333 M2 Rp 248,360.00 Rp 2,069,666.667
Jumlah BL1. Rp 5,771,381.493
BL2. BETON BALOK 30/50 CM (Besi 8ø16 + 2ø12 dan 2Pø10 -10/20 cm = 132,883 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 1,336,625.00 Rp 1,336,625.000
- Besi Beton (polos/ulir) 132.883 Kg Rp 18,949.00 Rp 2,518,009.214
- Begesting Papan (maks. 1 x pakai) 8.667 M2 Rp 248,360.00 Rp 2,152,453.333
Jumlah BL2. Rp 6,007,087.548
BL3. BETON BALOK 20/40 CM (Besi 4ø16 + 2ø12 dan 2Pø10 -10/20 cm = 173,043 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 1,336,625.00 Rp 1,336,625.000
- Besi Beton (polos/ulir) 173.043 Kg Rp 18,949.00 Rp 3,278,987.054
- Begesting Papan (maks. 1 x pakai) 12.500 M2 Rp 248,360.00 Rp 3,104,500.000
Jumlah BL3. Rp 7,720,112.054
BL4. BETON BALOK 20/30 CM (Besi 3ø12, Besi 3ø12 dan 2Pø8 -20 cm = 107,982 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 1,336,625.00 Rp 1,336,625.000
- Besi Beton (polos/ulir) 107.982 Kg Rp 18,949.00 Rp 2,046,150.568
- Begesting Papan (maks. 1 x pakai) 13.333 M2 Rp 248,360.00 Rp 3,311,466.667
Jumlah BL4. Rp 6,694,242.235
BL5. BETON BALOK 15/25 CM (Besi 4ø12 + 2ø12 dan 2Pø8 -20 cm = 163,234 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 1,336,625.00 Rp 1,336,625.000
- Besi Beton (polos/ulir) 163.234 Kg Rp 18,949.00 Rp 3,093,128.416
- Begesting Papan (maks. 1 x pakai) 13.333 M2 Rp 248,360.00 Rp 3,311,466.667
Jumlah BL5. Rp 7,741,220.083
BL6. BETON BALOK 15/20 CM (Besi 2ø12 + 2ø12 dan 2Pø8 -20 cm = 143,650 Kg/m3) K-175 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-175 1.000 M3 Rp 1,240,048.00 Rp 1,240,048.000
- Besi Beton (polos/ulir) 143.650 Kg Rp 18,949.00 Rp 2,722,023.690
- Begesting Papan (maks. 1 x pakai) 13.333 M2 Rp 248,360.00 Rp 3,311,466.667
Jumlah BL6. Rp 7,273,538.357
BL7. BETON BALOK 12/25 CM (Besi 4ø10 + 2ø10 dan 2Pø6 -20 cm = 131,446 Kg/m3) K-175 SITE MIX BEGISTING PAPAN
Analisa_Beton Halaman : 77
Perhitungan Beton Bertulang
Tahun Anggaran 2018
BL8. BETON BALOK 20/40 CM, Portal Pintu Utama (Besi 4ø12 + 4ø10 dan 2Pø8 -20 cm = 82,669 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 1,336,625.00 Rp 1,336,625.000
- Besi Beton (polos/ulir) 82.669 Kg Rp 18,949.00 Rp 1,566,498.256
- Begesting Papan (maks. 1 x pakai) 10.000 M2 Rp 248,360.00 Rp 2,483,600.000
Jumlah BL8. Rp 5,386,723.256
BL9. BETON BALOK 12/20 CM, Pagar Depan (Besi 4ø10 dan 2Pø6 -20 cm = 113,884 Kg/m3) K-175 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-175 1.000 M3 Rp 1,240,048.00 Rp 1,240,048.000
- Besi Beton (polos/ulir) 113.884 Kg Rp 18,949.00 Rp 2,157,990.708
- Begesting Papan (maks. 1 x pakai) 16.667 M2 Rp 248,360.00 Rp 4,139,333.333
Jumlah BL9. Rp 7,537,372.042
BL10. BETON BALOK 30/40 CM (Besi 5ø16 + 3ø16 dan 2Pø10 -10/20 cm = 145,070 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 1,336,625.00 Rp 1,336,625.000
- Besi Beton (polos/ulir) 145.070 Kg Rp 18,949.00 Rp 2,748,932.563
- Begesting Papan (maks. 1 x pakai) 9.167 M2 Rp 248,360.00 Rp 2,276,633.333
Jumlah BL10. Rp 6,362,190.897
BL11. BETON BALOK 40/60 CM (Besi 4ø19 + 6ø16 dan 2Pø10 -10/20 cm = 106,916 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 1,336,625.00 Rp 1,336,625.000
- Besi Beton (polos/ulir) 106.916 Kg Rp 18,949.00 Rp 2,025,944.951
- Begesting Papan (maks. 1 x pakai) 6.667 M2 Rp 248,360.00 Rp 1,655,733.333
Jumlah BL11. Rp 5,018,303.285
BL12. BETON BALOK 40/70 CM (Besi 4ø19 + 8ø16 dan 2Pø10 -10/20 cm = 105,740 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 1,336,625.00 Rp 1,336,625.000
- Besi Beton (polos/ulir) 105.740 Kg Rp 18,949.00 Rp 2,003,662.380
- Begesting Papan (maks. 1 x pakai) 6.429 M2 Rp 248,360.00 Rp 1,596,600.000
Jumlah BL12. Rp 4,936,887.380
BETON PLAT
PL2. BETON PLAT LANTAI TBL. 15 CM (Besi ø10 -20 cm + Besi ø10 -20 cm = 89,502 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 1,336,625.00 Rp 1,336,625.000
- Besi Beton (polos/ulir) 89.502 Kg Rp 18,949.00 Rp 1,695,976.642
- Begesting Papan (maks. 1 x pakai) 8.967 M2 Rp 248,360.00 Rp 2,226,961.333
Jumlah PL2. Rp 5,259,562.975
PL3. BETON PLAT LANTAI TBL. 12 CM (Besi ø10 -20 cm + Besi ø10 -20 cm = 108,263 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 1,336,625.00 Rp 1,336,625.000
- Besi Beton (polos/ulir) 108.263 Kg Rp 18,949.00 Rp 2,051,471.331
- Begesting Papan (maks. 1 x pakai) 10.573 M2 Rp 248,360.00 Rp 2,625,993.067
Jumlah PL3. Rp 6,014,089.398
PL5. BETON PLAT TANGGA TBL. 10 CM (Besi ø10 -20 cm = 117,346 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 1,336,625.00 Rp 1,336,625.000
- Besi Beton (polos/ulir) 117.346 Kg Rp 18,949.00 Rp 2,223,598.206
- Begesting Papan (maks. 1 x pakai) 12.200 M2 Rp 248,360.00 Rp 3,029,992.000
Jumlah PL5. Rp 6,590,215.206
PL6. BETON PLAT KANOPI/LISPLANK TBL. 10 CM, LBR. 45 CM (Besi ø10 -15 cm = 81,753 Kg/m3) K-200 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-200 1.000 M3 Rp 1,283,028.00 Rp 1,283,028.000
- Besi Beton (polos/ulir) 81.753 Kg Rp 18,949.00 Rp 1,549,141.878
- Begesting Papan (maks. 1 x pakai) 14.100 M2 Rp 248,360.00 Rp 3,501,876.000
Analisa_Beton Halaman : 78
Perhitungan Beton Bertulang
Tahun Anggaran 2018
PL9. BETON PLAT LANTAI ATAP TBL. 10 CM, LBR. 100 CM (Besi ø10 -20 cm = 127,135 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 1,336,625.00 Rp 1,336,625.000
- Besi Beton (polos/ulir) 127.135 Kg Rp 18,949.00 Rp 2,409,073.697
- Begesting Papan (maks. 1 x pakai) 12.200 M2 Rp 248,360.00 Rp 3,029,992.000
Jumlah PL9. Rp 6,775,690.697
PL10. BETON PLAT INJAKAN TANGGA TGI. 50 CM, LBR. 100 CM (Besi ø10 -20 cm = 31,589 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 1,336,625.00 Rp 1,336,625.000
- Besi Beton (polos/ulir) 31.589 Kg Rp 18,949.00 Rp 598,579.991
- Begesting Papan (maks. 1 x pakai) 2.500 M2 Rp 248,360.00 Rp 620,900.000
Jumlah PL10. Rp 2,556,104.991
Analisa_Beton Halaman : 79
MENGHITUNG BERAT BESI DALAM 1 M3 BETON (BESTAT)
Halaman : 80
MENGHITUNG BERAT BESI DALAM 1 M3 BETON (BESTAT)
BETON SLOOF
Besi 16 Banci =
1 Beton Sloof 30/50 14,5 16
Besi mmBanci =
Volume Beton 0.300 x 0.500 x 6.667 (pasaran)
14,5
Besi 8mm
Banci = = 1.000 m3
BESTAT : (pasaran)
7,0 mm
Tulangan ø16 mm 6.767 x 6.000 x 1.480 (pasaran) = 60.108 kg
Tulangan ø12 mm 6.767 x 3.000 x 0.815 = 16.544 kg
Besi Beugel ø10 - 15 cm 1.500 x 44.444 bh 0.556 = 37.076 kg
Berat besi (kg) -----> 113.728 kg
Volume Beton 1.000 m3
Berat besi tiap 1 m3 beton 113.728 kg
Bekisting tiap m3 Beton = 6.667 m2
Besi 16 Banci =
2 Beton Sloof 20/40 14,5 12
Besi mmBanci =
Volume Beton 0.200 x 0.400 x 12.500 (pasaran)
10,5
Besi 8mm
Banci = = 1.000 m3
BESTAT : (pasaran)
7,0 mm
Tulangan ø 16 mm 12.660 x 8.000 x 1.292 (pasaran) = 130.880 kg
Tulangan ø 12 mm 12.660 x 4.000 x 0.678 = 34.315 kg
Besi Beugel ø 8 - 15 cm 1.200 x 83.333 bh 0.301 = 30.117 kg
Berat besi (kg) -----> 195.311 kg
Volume Beton 1.000 m3
Berat besi tiap 1 m3 beton 195.311 kg
Bekisting tiap m3 Beton = 10.000 m2
Besi 16 Banci =
3 Beton Sloof 20/30 14,5 mmBanci =
Besi 12
Volume Beton 0.200 x 0.300 x 16.667 (pasaran)
10,5
Besi 8mm
Banci = = 1.000 m3
BESTAT : (pasaran)
7,0 mm
Tulangan ø 16 mm 16.767 x 4.000 x 1.292 (pasaran) = 86.667 kg
Tulangan ø 12 mm 16.767 x 6.000 x 0.678 = 68.169 kg
Besi Beugel ø 8 - 15 cm 0.900 x 111.111 bh 0.301 = 30.117 kg
Berat besi (kg) -----> 184.953 kg
Volume Beton 1.000 m3
Berat besi tiap 1 m3 beton 184.953 kg
Bekisting tiap m3 Beton = 10.000 m2
Besi 12 Banci =
4 Beton Sloof 20/25 10,5 12
Besi mmBanci =
Volume Beton 0.200 x 0.250 x 20.000 (pasaran)
10,5
Besi 8mm
Banci = = 1.000 m3
BESTAT : (pasaran)
7,0 mm
Tulangan ø 12 mm 20.100 x 4.000 x 0.678 (pasaran) = 54.481 kg
Tulangan ø 12 mm 20.100 x 4.000 x 0.678 = 54.481 kg
Besi Beugel ø 8 - 15 cm 0.800 x 133.333 bh 0.301 = 32.125 kg
Berat besi (kg) -----> 141.087 kg
Volume Beton 1.000 m3
Berat besi tiap 1 m3 beton 141.087 kg
Bekisting tiap m3 Beton = 5.000 m2
Besi 12 Banci =
5 Beton Sloof 15/25 10,5 16
Besi mmBanci =
Volume Beton 0.150 x 0.250 x 26.667 (pasaran)
14,5 8mm
Besi Banci = = 1.000 m3
BESTAT : (pasaran)
7,0 mm
Tulangan ø12 mm 26.767 x 4.000 x 0.815 (pasaran) = 87.255 kg
Tulangan ø12 mm 26.767 x 2.000 x 0.815 = 43.627 kg
Besi Beugel ø8 - 20 cm 0.700 x 133.333 bh 0.347 = 32.352 kg
Berat besi (kg) -----> 163.234 kg
Volume Beton 1.000 m3
Berat besi tiap 1 m3 beton 163.234 kg
Bekisting tiap m3 Beton = 6.667 m2
Besi 12 Banci =
6 Beton Sloof 15/20 10,5 16
Besi mmBanci =
Volume Beton 0.150 x 0.200 x 33.333 (pasaran)
14,5
Besi Banci = =
8mm 1.000 m3
BESTAT : (pasaran)
7,0 mm
Tulangan ø12 mm 33.433 x 2.000 x 0.815 (pasaran) = 54.494 kg
Tulangan ø12 mm 33.433 x 2.000 x 0.815 = 54.494 kg
Besi Beugel ø8 - 20 cm 0.600 x 222.222 bh 0.347 = 46.217 kg
Halaman : 81
MENGHITUNG BERAT BESI DALAM 1 M3 BETON (BESTAT)
Halaman : 82
MENGHITUNG BERAT BESI DALAM 1 M3 BETON (BESTAT)
BETON KOLOM
Besi 16 Banci =
1 KOLOM STRUKTUR 50/50 14,5 16
Besi mmBanci =
Volume Beton 0.500 x 0.500 x 4.000 (pasaran)
14,5
Besi 8mm
Banci = = 1.000 m3
BESTAT : (pasaran)
7,0 mm
Tulangan ø 19 mm ( polos ) 4.100 x 4.000 x 2.109 (pasaran) = 34.588 kg
Tulangan ø 16 mm ( polos ) 4.100 x 8.000 x 1.480 = 48.560 kg
Besi Beugel 2Pø10 - 10/20 cm 1.900 x 30.000 bh 0.556 = 31.700 kg
Berat besi (kg) -----> 114.848 kg
Volume Beton 1.000 m3
Berat besi tiap 1 m3 beton 114.848 kg
Bekisting tiap m3 Beton = 8.000 m2
Besi 16 Banci =
2 KOLOM STRUKTUR 30/30 14,5 16
Besi mmBanci =
Volume Beton 0.300 x 0.300 x 11.111 (pasaran)
14,5
Besi 8mm
Banci = = 1.000 m3
BESTAT : (pasaran)
7,0 mm
Tulangan ø 16 mm ( polos ) 11.211 x 4.000 x 1.480 (pasaran) = 66.391 kg
Tulangan ø 12 mm ( polos ) 11.211 x 4.000 x 0.815 = 36.546 kg
Besi Beugel 2Pø10 - 10/20 cm 1.100 x 83.333 bh 0.556 = 50.980 kg
Berat besi (kg) -----> 153.918 kg
Volume Beton 1.000 m3
Berat besi tiap 1 m3 beton 153.918 kg
Bekisting tiap m3 Beton = 13.333 m2
Besi 16 Banci =
3 KOLOM STRUKTUR 20/40 14,5 mmBanci =
Besi 16
Volume Beton 0.200 x 0.400 x 12.500 (pasaran)
14,5
Besi 8mm
Banci = = 1.000 m3
BESTAT : (pasaran)
7,0 mm
Tulangan ø 16 mm ( polos ) 12.600 x 4.000 x 1.480 (pasaran) = 74.616 kg
Tulangan ø 12 mm ( polos ) 12.600 x 2.000 x 0.815 = 20.537 kg
Besi Beugel 2Pø10 - 20 cm 1.100 x 62.500 bh 0.347 = 23.831 kg
Berat besi (kg) -----> 118.984 kg
Volume Beton 1.000 m3
Berat besi tiap 1 m3 beton 118.984 kg
Bekisting tiap m3 Beton = 15.000 m2
Besi 12 Banci =
4 KOLOM STRUKTUR 25/25 10,5 12
Besi mmBanci =
Volume Beton 0.250 x 0.250 x 16.000 (pasaran)
10,5
Besi 8mm
Banci = = 1.000 m3
BESTAT : (pasaran)
7,0 mm
Tulangan ø 12 mm ( polos ) 16.100 x 4.000 x 0.815 (pasaran) = 52.483 kg
Tulangan ø 10 mm ( polos ) 16.100 x 4.000 x 0.556 = 35.816 kg
Besi Beugel 2Pø8 - 20 cm 0.900 x 80.000 bh 0.347 = 24.957 kg
Berat besi (kg) -----> 113.256 kg
Volume Beton 1.000 m3
Berat besi tiap 1 m3 beton 113.256 kg
Bekisting tiap m3 Beton = 16.000 m2
Besi 12 Banci =
5 KOLOM STRUKTUR 20/20 10,5 12
Besi mmBanci =
Volume Beton 0.200 x 0.200 x 25.000 (pasaran)
10,5 8mm
Besi Banci = = 1.000 m3
BESTAT : (pasaran)
7,0 mm
Tulangan ø 12 mm ( polos ) 25.100 x 4.000 x 0.815 (pasaran) = 81.822 kg
Tulangan ø 10 mm ( polos ) 25.100 x 4.000 x 0.556 = 55.837 kg
Besi Beugel 2Pø8 - 20 cm 0.700 x 125.000 bh 0.347 = 30.330 kg
Berat besi (kg) -----> 167.989 kg
Volume Beton 1.000 m3
Berat besi tiap 1 m3 beton 167.989 kg
Bekisting tiap m3 Beton = 20.000 m2
Besi 12 Banci =
6 KOLOM 15/15 (PRAKTIS) 10,5 12
Besi mmBanci =
Volume Beton 0.150 x 0.150 x 44.444 (pasaran)
10,5
Besi Banci = =
8mm 1.000 m3
BESTAT : (pasaran)
7,0 mm
Tulangan ø 12 mm 44.544 x 2.000 x 0.678 (pasaran) = 60.369 kg
Tulangan ø 12 mm 44.544 x 2.000 x 0.678 = 60.369 kg
Besi Beugel ø 6 - 15 cm 0.500 x 296.296 bh 0.186 = 27.544 kg
Halaman : 83
MENGHITUNG BERAT BESI DALAM 1 M3 BETON (BESTAT)
Halaman : 84
Besi 8 Banci =
7,0 mm
MENGHITUNG BERAT BESI DALAM 1 M3 BETON (BESTAT)
(pasaran)
Besi 16 Banci =
20 KOLOM STRUKTUR 30/50 14,5 mmBanci =
Besi 16
Volume Beton 0.300 x 0.500 x 6.667 (pasaran)
14,5
Besi 8mm
Banci = = 1.000 m3
BESTAT : (pasaran)
7,0 mm
Tulangan ø 16 mm ( polos ) 6.767 x 5.000 x 1.480 (pasaran) = 50.090 kg
Tulangan ø 16 mm ( polos ) 6.767 x 5.000 x 1.480 = 50.090 kg
Besi Beugel 2Pø10 - 10/20 cm 1.500 x 50.000 bh 0.556 = 41.711 kg
Berat besi (kg) -----> 141.890 kg
Volume Beton 1.000 m3
Berat besi tiap 1 m3 beton 141.890 kg
Bekisting tiap m3 Beton = 10.667 m2
Halaman : 86
MENGHITUNG BERAT BESI DALAM 1 M3 BETON (BESTAT)
BETON BALOK
Besi 16 Banci =
1 BALOK STRUKTUR 30/60 14,5 16
Besi mmBanci =
Volume Beton 0.300 x 0.600 x 5.556 (pasaran)
14,5
Besi 8mm
Banci = = 1.000 m3
BESTAT : (pasaran)
7,0 mm
Tulangan ø 16 mm 5.656 x 8.000 x 1.480 (pasaran) = 66.984 kg
Tulangan ø 12 mm 5.656 x 4.000 x 0.815 = 18.436 kg
Besi Beugel 2Pø10 - 10/20 cm 1.700 x 41.667 bh 0.556 = 39.394 kg
Berat besi (kg) -----> 124.813 kg
Volume Beton 1.000 m3
Berat besi tiap 1 m3 beton 124.813 kg
Bekisting tiap m3 Beton = 8.333 m2
Besi 16 Banci =
2 BALOK STRUKTUR 30/50 14,5 12
Besi mmBanci =
Volume Beton 0.300 x 0.500 x 6.667 (pasaran)
10,5
Besi 8mm
Banci = = 1.000 m3
BESTAT : (pasaran)
7,0 mm
Tulangan ø 16 mm 6.767 x 8.000 x 1.480 (pasaran) = 80.144 kg
Tulangan ø 12 mm 6.767 x 2.000 x 0.815 = 11.029 kg
Besi Beugel 2Pø10 - 10/20 cm 1.500 x 50.000 x 0.556 = 41.711 kg
Berat besi (kg) -----> 132.883 kg
Volume Beton 1.000 m3
Berat besi tiap 1 m3 beton 132.883 kg
Bekisting tiap m3 Beton = 8.667 m2
Besi 16 Banci =
3 BALOK STRUKTUR 20/40 14,5 mmBanci =
Besi 12
Volume Beton 0.200 x 0.400 x 12.500 (pasaran)
10,5
Besi 8mm
Banci = = 1.000 m3
BESTAT : (pasaran)
7,0 mm
Tulangan ø 16 mm 12.600 x 4.000 x 1.480 (pasaran) = 74.616 kg
Tulangan ø 12 mm 12.600 x 4.000 x 0.815 = 41.074 kg
Besi Beugel 2Pø10 - 10/20 cm 1.100 x 93.750 bh 0.556 = 57.352 kg
Berat besi (kg) -----> 173.043 kg
Volume Beton 1.000 m3
Berat besi tiap 1 m3 beton 173.043 kg
Bekisting tiap m3 Beton = 12.500 m2
Besi 16 Banci =
4 BALOK ANAK 20/30 14,5 12
Besi mmBanci =
Volume Beton 0.200 x 0.300 x 16.667 (pasaran)
10,5
Besi 8mm
Banci = = 1.000 m3
BESTAT : (pasaran)
7,0 mm
Tulangan ø 12 mm 16.767 x 3.000 x 0.815 (pasaran) = 40.992 kg
Tulangan ø 12 mm 16.767 x 3.000 x 0.815 = 40.992 kg
Besi Beugel 2Pø8 - 20 cm 0.900 x 83.333 x 0.347 = 25.997 kg
Berat besi (kg) -----> 107.982 kg
Volume Beton 1.000 m3
Berat besi tiap 1 m3 beton 107.982 kg
Bekisting tiap m3 Beton = 13.333 m2
Besi 12 Banci =
5 BALOK RING 15/25 10,5 12
Besi mmBanci =
Volume Beton 0.150 x 0.250 x 26.667 (pasaran)
10,5 8mm
Besi Banci = = 1.000 m3
BESTAT : (pasaran)
7,0 mm
Tulangan ø 12 mm 26.767 x 4.000 x 0.815 (pasaran) = 87.255 kg
Tulangan ø 12 mm 26.767 x 2.000 x 0.815 = 43.627 kg
Besi Beugel 2Pø8 - 20 cm 0.700 x 133.333 x 0.347 = 32.352 kg
Berat besi (kg) -----> 163.234 kg
Volume Beton 1.000 m3
Berat besi tiap 1 m3 beton 163.234 kg
Bekisting tiap m3 Beton = 13.333 m2
Besi 12 Banci =
6 BALOK RING 15/20 10,5 12
Besi mmBanci =
Volume Beton 0.150 x 0.200 x 33.333 (pasaran)
10,5
Besi Banci = =
8mm 1.000 m3
BESTAT : (pasaran)
7,0 mm
Tulangan ø 12 mm 33.433 x 2.000 x 0.815 (pasaran) = 54.494 kg
Tulangan ø 12 mm 33.433 x 2.000 x 0.815 = 54.494 kg
Besi Beugel 2Pø8 - 20 cm 0.600 x 166.667 x 0.347 = 34.663 kg
Halaman : 87
MENGHITUNG BERAT BESI DALAM 1 M3 BETON (BESTAT)
Halaman : 89
MENGHITUNG BERAT BESI DALAM 1 M3 BETON (BESTAT)
BETON PLAT
Besi 12 Banci =
1 BETON PLAT LANTAI ( tbl. 20 cm, lbr. 100 cm ) 10,5 12
Besi mmBanci =
Volume Beton 0.200 x 1.000 x 5.000 (pasaran)
10,5 mm = 1.000 m3
BESTAT : (pasaran)
Tulangan ø 12 - 20 cm 5.400 x 5.000 x 0.815 x 2.00 lps = 44.008 kg
Tulangan ø 12 - 20 cm 1.400 x 25.000 x 0.815 x 2.00 lps = 57.047 kg
Berat besi (kg) -----> = 101.055 kg
Volume Beton = 1.000 m3
Berat besi tiap 1 m3 beton = 101.055 kg
Bekisting tiap m3 Beton = 7.400 m2
Besi 12 Banci =
2 BETON PLAT LANTAI ( tbl. 15 cm, lbr. 100 cm ) 10,5 12
Besi mmBanci =
Volume Beton 0.150 x 1.000 x 6.667 (pasaran)
10,5 mm = 1.000 m3
BESTAT : (pasaran)
Tulangan ø 10 - 20 cm 7.027 x 5.000 x 0.556 x 2.00 lps = 39.078 kg
Tulangan ø 10 - 20 cm 1.360 x 33.333 x 0.556 x 2.00 lps = 50.424 kg
Berat besi (kg) -----> = 89.502 kg
Volume Beton = 1.000 m3
Berat besi tiap 1 m3 beton = 89.502 kg
Bekisting tiap m3 Beton = 8.967 m2
Besi 12 Banci =
3 BETON PLAT LANTAI ( tbl. 12 cm, lbr. 100 cm ) 10,5 12
Besi mmBanci =
Volume Beton 0.120 x 1.000 x 8.333 (pasaran)
10,5 mm = 1.000 m3
BESTAT : (pasaran)
Tulangan ø 10 - 20 cm 8.633 x 5.000 x 0.556 x 2.00 lps = 48.014 kg
Tulangan ø 10 - 20 cm 1.300 x 41.667 x 0.556 x 2.00 lps = 60.249 kg
Berat besi (kg) -----> = 108.263 kg
Volume Beton = 1.000 m3
Berat besi tiap 1 m3 beton = 108.263 kg
Bekisting tiap m3 Beton = 10.573 m2
Besi 12 Banci =
4 BETON DINDING ( Tebal = 12 cm, Panjang = 100 cm ) 10,5 12
Besi mmBanci =
Volume Beton 0.120 x 1.000 x 8.333 (pasaran)
10,5 mm = 1.000 m3
BESTAT : (pasaran)
Tulangan ø 10 - 20 cm 8.613 x 5.000 x 0.556 x 2.00 lps = 47.903 kg
Tulangan ø 10 - 20 cm 1.280 x 41.667 x 0.556 x 2.00 lps = 59.322 kg
Berat besi (kg) -----> = 107.225 kg
Volume Beton = 1.000 m3
Berat besi tiap 1 m3 beton = 107.225 kg
Bekisting tiap m3 Beton = 18.667 m2
Besi 10 Banci =
5 LISPLANK / PLAT KANOPI (tbl. 10 cm, lbr. 50 cm) 9,0 mm
Besi 12 Banci =
Volume Beton 0.100 x 0.500 x 20.000 (pasaran)
10,50 mm = 1.000 m3
BESTAT : (pasaran)
Tulangan ø 10 - 15 cm 20.100 x 3.333 x 0.556 x 1.00 lps = 37.262 kg
Tulangan ø 10 - 15 cm 0.600 x 133.333 x 0.556 x 1.00 lps = 44.492 kg
Berat besi (kg) -----> = 81.753 kg
Volume Beton = 1.000 m3
Berat besi tiap 1 m3 beton = 81.753 kg
Bekisting tiap m3 Beton = 14.100 m2
Besi 10 Banci =
6 BETON TANGGA ( tbl. 10 cm, lbr. 100 cm ) 9,0 mm
Besi 12 Banci =
Volume Beton 0.100 x 1.000 x 10.000 (pasaran)
10,50 mm = 1.000 m3
BESTAT : (pasaran)
Tulangan ø 10 - 20 cm 10.100 x 5.000 x 0.556 x 2.00 lps = 56.171 kg
Tulangan ø 10 - 20 cm 1.100 x 50.000 x 0.556 x 2.00 lps = 61.176 kg
Berat besi (kg) -----> = 117.346 kg
Volume Beton = 1.000 m3
Berat besi tiap 1 m3 beton = 117.346 kg
Bekisting tiap m3 Beton = 12.200 m2
Besi 10 Banci =
7 MEJA BETON PANTRY (tbl. 10 cm, lbr. 60 cm) 9,0 mm
Besi 10 Banci =
(pasaran)
9,0 mm
(pasaran) Halaman : 90
MENGHITUNG BERAT BESI DALAM 1 M3 BETON (BESTAT)
Besi 10 Banci =
9,0 mm
Besi 10 Banci =
Volume Beton 0.100 x 0.600 x 16.667 (pasaran)
9,0 mm = 1.000 m3
BESTAT : (pasaran)
Tulangan ø10 - 20 cm 16.827 x 3.000 x 0.556 x 1.00 lps = 28.074 kg
Tulangan ø10 - 20 cm 0.760 x 83.333 x 0.556 x 1.00 lps = 35.222 kg
Berat besi (kg) -----> = 63.297 kg
Volume Beton = 1.000 m3
Berat besi tiap 1 m3 beton = 63.297 kg
Bekisting tiap m3 Beton = 3.453 m2
Besi 10 Banci =
8 PLAT BETON CETAK SETEMPAT ( Tbl. 8 cm, lbr. 100 cm ), Besi 1 lapis 9,0
Besimm
10 Banci =
Volume Beton 0.080 x 1.000 x 12.500 (pasaran)
9,0 mm = 1.000 m3
BESTAT : (pasaran)
Tulangan ø 10 - 20 cm 12.460 x 5.000 x 0.556 x 1.00 lps = 34.648 kg
Tulangan ø 10 - 20 cm 0.960 x 62.500 x 0.556 x 1.00 lps = 33.369 kg
Berat besi (kg) -----> = 68.016 kg
Volume Beton = 1.000 m3
Berat besi tiap 1 m3 beton = 68.016 kg
Bekisting tiap m3 Beton = 2.160 m2
Besi 10 Banci =
9 BETON PLAT LANTAI ATAP ( tbl. 10 cm, lbr. 100 cm ) 9,0 mm
Besi 10 Banci =
Volume Beton 0.100 x 1.000 x 10.000 (pasaran)
9,0 mm = 1.000 m3
BESTAT : (pasaran)
Tulangan ø 10 - 20 cm 10.260 x 5.000 x 0.556 x 2.00 lps = 57.060 kg
Tulangan ø 10 - 20 cm 1.260 x 50.000 x 0.556 x 2.00 lps = 70.074 kg
Berat besi (kg) -----> = 127.135 kg
Volume Beton = 1.000 m3
Berat besi tiap 1 m3 beton = 127.135 kg
Bekisting tiap m3 Beton = 12.200 m2
Besi 10 Banci =
10 BETON INJAKAN TANGGA ( tgi. 50 cm, lbr. 100 cm ) 9,0
Besimm
12 Banci =
Volume Beton 0.500 x 1.000 x 4.000 (pasaran)
10,50 mm = 1.000 m3
BESTAT : (pasaran)
Tulangan ø 10 - 20 cm 4.160 x 5.000 x 0.556 x 1.00 lps = 11.568 kg
Tulangan ø 10 - 20 cm 1.800 x 20.000 x 0.556 x 1.00 lps = 20.021 kg
Berat besi (kg) -----> = 31.589 kg
Volume Beton = 1.000 m3
Berat besi tiap 1 m3 beton = 31.589 kg
Bekisting tiap m3 Beton = 2.500 m2
Halaman : 91
###
Daftar Satuan Upah Kerja
Tahun Anggaran 2018
###
a b c d e f ###
BP Thn. 2016 (semester II)
A. UPAH ###
1 Mandor HU.001 Rp 175,000.00 /Hari 1 Org/ HR/ 7 Jam ###
2 Kepala Tukang HU.002 Rp 150,000.00 /Hari 1 Org/ HR/ 7 Jam ###
3 Kepala Tukang Batu HU.003 Rp 150,000.00 /Hari 1 Org/ HR/ 7 Jam
4 Kepala Tukang Kayu HU.004 Rp 150,000.00 /Hari 1 Org/ HR/ 7 Jam
5 Kepala Tukang Besi HU.005 Rp 150,000.00 /Hari 1 Org/ HR/ 7 Jam
6 Kepala Tukang Cat HU.006 Rp 150,000.00 /Hari 1 Org/ HR/ 7 Jam
7 Tukang HU.007 Rp 125,000.00 /Hari 1 Org/ HR/ 7 Jam ###
8 Tukang Batu HU.008 Rp 125,000.00 /Hari 1 Org/ HR/ 7 Jam
9 Tukang Kayu HU.009 Rp 125,000.00 /Hari 1 Org/ HR/ 7 Jam
10 Tukang Besi HU.010 Rp 125,000.00 /Hari 1 Org/ HR/ 7 Jam
11 Tukang Cat HU.011 Rp 125,000.00 /Hari 1 Org/ HR/ 7 Jam
12 Tukang Gali HU.012 Rp 125,000.00 /Hari 1 Org/ HR/ 7 Jam
13 Pekerja HU.013 Rp 75,000.00 /Hari 1 Org/ HR/ 7 Jam ###
14 Operator HU.014 Rp 150,000.00 /Hari 1 Org/ HR/ 7 Jam ###
15 Operator kurang terlatih HU.015 Rp 75,000.00 /Hari 1 Org/ HR/ 7 Jam ###
16 Pembantu operator HU.016 Rp 75,000.00 /Hari 1 Org/ HR/ 7 Jam ###
17 Supir HU.017 Rp 150,000.00 /Hari 1 Org/ HR/ 7 Jam ###
18 Pekerja Galian & Urugan HU.018 Rp 75,000.00 /Hari 1 Org/ HR/ 7 Jam ###
19 Tukang Listrik HU.019 Rp 125,000.00 /Hari 1 Org/ HR/ 7 Jam ###
20 Tukang Pipa HU.020 Rp 125,000.00 /Hari 1 Org/ HR/ 7 Jam ###
21 Tukang Las HU.021 Rp 125,000.00 /Hari 1 Org/ HR/ 7 Jam ###
a b c d e f ###
BP Thn. 2016
B. BAHAN ###
1 Air Kerja HB.001 Rp 70.00 /Ltr ###
2 Semen Portland (PC) HB.002 Rp 1,620.00 /Kg PC TONASA 50 Kg ###
3 Batu Besar (BB) HB.003 Rp 250,000.00 /M3 Bt.Karang, Bt.Belah (15/20) ###
4 Batu Karang Belah (BKB) HB.004 Rp 250,000.00 /M3 Bt.Karang, Bt.Belah (20/30) ###
5 Kerikil Beton (KB) HB.005 Rp 292,000.00 /M3 BJ Kerikil = 1350 kg/m3 ###
6 Pasir Pasangan (PP) HB.006 Rp 250,000.00 /M3 BJ Pasir = 1400 kg/m3 ###
7 Pasir Beton (PB) HB.007 Rp 250,000.00 /M3 ###
8 Pasir Urugan (PU) HB.008 Rp 250,000.00 /M3 ###
9 Kayu Kelas I HB.009 Rp 7,910,000.00 /M3 Kayu Besi (Merbau) ###
10 Papan Kayu Kelas I HB.010 Rp 7,910,000.00 /M3 Kayu Besi/Linggoa ###
11 Kayu Kelas II HB.011 Rp 3,160,000.00 /M3 Kayu Matoa/Makila ###
12 Papan Kayu Kelas II HB.012 Rp 3,160,000.00 /M3 Kayu Matoa/Makila ###
13 Kayu Kelas III HB.013 Rp 2,030,000.00 /M3 Semua Ukuran ###
14 Papan Kayu Kelas III HB.014 Rp 2,030,000.00 /M3 Semua Ukuran ###
15 Dolken Kayu Galam φ (8–10) cm HB.015 Rp 49,600.00 /Bh ###
16 Formite/penjaga jarak bekisting/spacer HB.016 Rp 15,700.00 /Bh ###
17 Kayu Stoot (bambu) 4 - 5 m HB.017 Rp 14,700.00 /Batang ###
18 Tanah Timbunan Biasa HB.018 Rp 150,000.00 /M3 ###
19 Tanah Timbunan Pilihan HB.019 Rp 312,000.00 /M3 ###
20 Tanah Sirtu HB.020 Rp 302,000.00 /M3 ###
21 Batu Bata uk. 23 x 12 x 8 HB.021 Rp 1,800.00 /Bh uk. Kecil ###
22 Batu Bata uk. 25 x 15 x 8 HB.022 Rp 2,800.00 /Bh ###
23 Bata Merah uk. (22 x 11 x 5) HB.023 Rp 2,000.00 /Bh ###
24 Bata Merah uk. (22 x 11 x 2,5) HB.024 Rp 1,300.00 /Bh ###
25 Zink Gelombang Bjls 0,20 HB.025 Rp 51,900.00 /lbr bjls 20 ###
26 Zink Gelombang Bjls 0,25 HB.026 Rp 67,800.00 /lbr bjls 25 ###
27 Zink Gelombang Bjls 0,27 HB.027 Rp 73,400.00 /lbr bjls 27 ###
28 Zink Gelombang Bjls 0,30 HB.028 Rp 79,100.00 /lbr bjls 30 ###
29 Zink Plat 3" x 6" BJLS 20 HB.029 Rp 56,500.00 /lbr bjls 20 ###
30 Zink Plat 3" x 6" BJLS 25 HB.030 Rp 73,400.00 /lbr ###
31 Zink Plat 3" x 6" BJLS 27 HB.031 Rp 77,600.00 /lbr ###
32 Zink Plat 3" x 6" BJLS 30 HB.032 Rp 81,900.00 /lbr ###
33 Zink Plat BJLS 20 lebar 30 cm HB.033 Rp 18,500.00 /m' ###
34 Zink Plat BJLS 20 lebar 40 cm HB.034 Rp 25,800.00 /m' ###
35 Zink Plat BJLS 20 lebar 45 cm HB.035 Rp 29,000.00 /m' ###
57 Geotextile (tbl. 3 mm) HB.057 Rp 39,500.00 /m2 ###
58 Triplek 3 mm HB.058 Rp 73,300.00 /lbr [uk. 120 x 240 cm] ###
59 Triplek 4 mm HB.059 Rp 88,700.00 /lbr [uk. 120 x 240 cm] ###
60 Triplek 5 mm HB.060 Rp 93,200.00 /lbr [uk. 120 x 240 cm] ###
61 Triplek 6 mm HB.061 Rp 97,700.00 /lbr [uk. 120 x 240 cm] ###
62 Triplek 9 mm HB.062 Rp 195,300.00 /lbr [uk. 120 x 240 cm] ###
63 Triplek 12 mm HB.063 Rp 244,100.00 /lbr [uk. 120 x 240 cm] ###
64 Triplek 15 mm HB.064 Rp 305,200.00 /lbr [uk. 120 x 240 cm] ###
65 Triplek 18 mm HB.065 Rp 311,400.00 /lbr [uk. 120 x 240 cm] ###
66 Triplek lapis aluminium HB.066 Rp 85,000.00 /lbr ###
67 Teakwood tbl. 4 mm HB.067 Rp 85,500.00 /lbr [uk. 120 x 240 cm] ###
68 Plywood tbl. 3 mm HB.068 Rp 135,700.00 /lbr [uk. 120 x 240 cm] ###
69 Plywood tbl. 9 mm HB.069 Rp 185,600.00 /lbr [uk. 120 x 240 cm] ###
Mengetahui / Menyetujui,
Kepala Bidang Perumahan Permukiman
dan Tata Bangun Selaku KPA sekaligus PPK
UPAH
Tenaga Kerja
Pekerja OH Rp 80,000.00
Tukang OH Rp 100,000.00
KepalaTukang OH Rp 120,000.00
Mandor OH Rp 150,000.00
Juru Gambar OH Rp 85,000.00
Juru Ukur OH Rp 85,000.00
Mekanik OH Rp 85,000.00
Operator Alat Berat OH Rp 110,000.00
ALAT
AMP Jam Rp 7,526,000.00
Asphalt Finisher Jam Rp 344,000.00
Asphalt Sprayer Jam Rp 61,000.00
Buldozer Jam Rp 582,000.00
Compressor Jam Rp 187,000.00
Dump Truck 3.5 ton Jam Rp 317,000.00
Excavator Jam Rp 564,000.00
Hari Rp 3,950,000.00
Generator Set Jam Rp 498,000.00
Tandem Roller Jam Rp 267,000.00
Tire Roller Jam Rp 201,000.00
Vibrator Roller Jam Rp 278,000.00
Water Tanker Jam Rp 298,000.00
Motor grader (/hari) Jam Rp 466,000.00
Wheel Loader Jam Rp 365,000.00
MATERIAL - ASPAL
Aspal
Aspal AC 60-70 kg Rp 22,000.00
B BAHAN BANGUNAN
BATU
###
Batu kali (D.15-30 cm) m3 217,500.00
Batu belah / kerakal m3 217,500.00
Batu pecah 5/7 cm m3 292,100.00
Batu pecah 3/5 cm m3 292,100.00
Batu pecah 2/3 cm (hrg di stone crusher) m3 820,300.00
Batu pecah 1/2 cm (hrg di stone crusher) m3 820,300.00
Batu pecah 0.5/1 cm (hrg di stone crusher) m3 820,300.00
Batu pecah 15/20 cm m3 292,100.00
Batu karang m3 217,500.00
Gravel m3 279,600.00
Agregat kasar m3 279,600.00
Abu Batu (hrg di stone crusher) m3 310,700.00
KERIKIL
###
Kerikil beton m3 292,100.00
Kerikil beton (kg) kg 273.00
Kerikil pantai m3 292,100.00
Kerikil sungai/pantai 5/7 cm m3 292,100.00
Kerikil sungai/pantai 3/5 cm m3 292,100.00
Kerikil sungai/pantai 2/3 cm m3 310,700.00
Kerikil sungai/pantai 1/2 cm m3 310,700.00
Kerikil sungai/pantai 0.5/1 cm m3 310,700.00
3 PASIR / TANAH
Pasir urug m3 174,000.00
Pasir pasangan / beton m3 217,500.00
Pasir pasangan / beton (kg) kg 310.00
Pasir kasar m3 174,000.00
Pasir gunung m3 174,000.00
Sirtu m3 186,400.00
Tanah urug m3 149,100.00
Tanah timbunan m3 149,100.00
Bahan pilihan m3 310,700.00
Agregat Halus m3 310,700.00
Agregat Base Kelas A m3 435,000.00
Agregat Base Kelas B m3 403,900.00
Agregat Base Kelas C m3 372,900.00
Air Kerja m3 62.00
5 KAPUR ADUK
Kapur api kg 10,100.00
7 SEMEN
Semen PC 50 kg sak 76,800.00
Semen tonasa 50 kg sak 76,800.00
Semen PC kg 1,620.00
Semen putih Jaguar 40 kg sak 131,000.00
Semen warna (0,7 kg) kg 18,100.00
Semen putih kg 3,800.00
8 BATAKO CETAK
Batako uk. 20x40x10 cm (comblok) pcs 3,300.00
Kualitas I (pres) pcs 2,800.00
Kualitas II (tangan) pcs 2,200.00
Diding rester(terawang) bh 57,600.00
Batu alam andesit polos (tempel) m2 186,800.00
Batu alam candi hitam m2 152,500.00
Batu alam palimanan m2 125,800.00
9 BAHAN ATAP
Genteng asbes lbr 45,200.00
Bubungan asbes m' 41,800.00
Genteng rainbouw/berpasir lbr 62,100.00
Bubungan genteng rainbouw/berpasir m' 87,500.00
Genteng Metal Colour lbr 62,100.00
Bubungan genteng Metal colour m' 87,500.00
Zink gelombang BJLS 0.20 (914 x 1829 mm) lbr 51,900.00
Zink gelombang BJLS 0.25 (914 x 1829 mm) lbr 67,800.00
Zink gelombang BJLS 0.30 (914 x 1829 mm) lbr 79,100.00
Zink datar BJLS 0.20 (914 x 1829 mm) lbr 56,500.00
Zink datar BJLS 0.25 (914 x 1829 mm) lbr 73,400.00
Zink datar BJLS 0.30 (914 x 1829 mm) lbr 81,900.00
Atap bitiminius tile + pasang. m2 280,900.00
Zink gelombang besar plastik bening lbr 67,800.00
Zink gelombang kecil plastik bening lbr 28,200.00
Zink warna BJLS 0.25 lbr 50,800.00
Genteng pri. Roof (87 x 83 x 0,25 mm) lbr 43,500.00
Genteng sakura roof lbr 53,600.00
Bubungan genteng sakura roof lbr 48,500.00
Genteng prima roof lbr 45,200.00
Bubungan Genteng prima roof lbr 39,500.00
DAFTAR HARGA SATUAN UPAH KERJA
Harga Satuan
No. Uraian Satuan
( Rp )
Atap Gelombang Go Green (uk. 180 x 80) lbr 48,000.00
Atap Gelombang Go Green (uk. 210 x 80) lbr 59,800.00
Atap Gelombang Go Green (uk. 240 x 80) lbr 70,000.00
Atap Gelombang Go Green (uk. 300 x 80) lbr 91,500.00
Nok 1 psng 80 cm lbr 62,100.00
Sisalation / Alluminium Foil m2 22,600.00
Zink Talang tbl.0,20 uk. Lbr. 85 cm m' 39,500.00
Genteng 2 x 5 Multiroof lbr 118,600.00
Genteng 1 x 5 Multiroof lbr 108,400.00
Genteng 2 x 5 Multicolor lbr 67,800.00
Genteng 1 x 5 Multicolor lbr 62,100.00
Nok Model U Multiroof lbr 45,200.00
Nok Model U Multicolor lbr 42,900.00
Nok Model C Multiroof lbr 32,700.00
Nok Model C Multicolor lbr 30,500.00
Nok Samping Multiroof lbr 44,000.00
Nok Samping Multicolor lbr 42,300.00
Wall Flashing Multiroof lbr 45,200.00
Wall Flashing Multicolor lbr 42,900.00
Tutup Nok Multiroof lbr 39,500.00
Tutup Nok Multicolor lbr 33,900.00
Atap Sirap Kayu Ulin lbr 6,200.00
Atap Spandek Zincalume (tbl. 0,3 mm) m2 65,500.00
Atap Spandek Zincalume (tbl. 0,35 mm) m2 73,200.00
Atap Spandek Zincalume (tbl. 0,4 mm) m2 82,300.00
Atap Spandek Zincalume (tbl. 0,45 mm) m2 91,500.00
Atap Spandek Zincalume (tbl. 0,5 mm) m2 99,100.00
Atap Seng Galvalum Gelombang (0,20mm x 1,8m x 80cm) m2 69,000.00
Atap Seng Galvalum Gelombang (0,25 mm x 180 cm) m2 88,100.00
Atap Seng Galvalum Gelombang (0,25 mm x 210 cm) m2 101,300.00
Atap Seng Galvalum Gelombang (0,25 mm x 240 cm) m2 117,500.00
Atap Seng Galvalum Gelombang (0,25 mm x 300 cm) m2 146,900.00
Atap Seng Galvalum Gelombang (0,30 mm x 180 cm) m2 99,800.00
Atap Seng Galvalum Gelombang (0,30 mm x 210 cm) m2 117,500.00
Atap Seng Galvalum Gelombang (0,30 mm x 240 cm) m2 132,200.00
Atap Seng Galvalum Gelombang (0,30 mm x 300 cm) m2 165,900.00
10 BAHAN KAYU
Kayu kls I m3 7,910,000.00
Kayu Kls II m3 3,164,000.00
Kayu Kls III m3 2,034,000.00
Kayu besi (kls I) m3 7,910,000.00
Kayu uk. 10/10 x 3 m m3 7,910,000.00
Kayu uk. 6/12 x 3 m m3 7,910,000.00
Kayu uk. 5/10 x 3 m m3 7,910,000.00
Kayu Lenggua (Papan kls I) m3 7,910,000.00
Papan kls II m3 3,164,000.00
Papan 3 cm kls II m3 3,164,000.00
Papan 2 cm kls II m3 3,164,000.00
Papan kayu kls I m3 7,910,000.00
Papan kayu kls II m3 3,164,000.00
Kayu Makila / Samama 10/10 x 3 m m3 3,164,000.00
Kayu Makila / Samama 5/10 x 3 m m3 3,164,000.00
Dolken Kayu Ø 8 - 10/400 cm btg 49,700.00
Bambu Ø 10 cm btg 16,900.00
REEF / LAT
Kayu kls I 5/7 x 3 m (Besi) m3 7,910,000.00
Kayu kls I 3/5 x 3 m (Besi) m3 7,910,000.00
Kayu kls I 2/3 x 3 m (Besi) m3 7,910,000.00
Kayu kls II 5/7 x 3 m (Samama) m3 3,164,000.00
Kayu kls II /3/5 x 3 m (Samama) m3 3,164,000.00
Kayu kls II /2/3 x 3 m (Samama) m3 3,164,000.00
11 BAHAN BETON
DAFTAR HARGA SATUAN UPAH KERJA
Harga Satuan
No. Uraian Satuan
( Rp )
Pilar pagar pcs 86,400.00
Pilar pagar beton pcs 86,400.00
Pilar tiang teras pcs 589,200.00
Beton K-125 m3 1,017,000.00
Beton K-175 m3 1,090,400.00
Beton K-225 m3 1,186,500.00
Cincin beton diameter dalam 60 cm, tbl. 6 cm/h = 0,50 m Bh 186,400.00
Cincin beton diameter dalam 70 cm, tbl. 7 cm/h = 0,50 m Bh 214,700.00
Cincin beton diameter dalam 80 cm, tbl. 8 cm/h = 0,50 m Bh 254,200.00
Cincin beton diameter dalam 90 cm, tbl. 9 cm/h = 0,50 m Bh 293,800.00
Cincin beton diameter dalam 100 cm, tbl. 10 cm/h = 0,50 m Bh 339,000.00
12 BAHAN LANTAI
Ubin PC Warna 20 x 20 cm dos 76,300.00
Ubin PC Warna 20 x 25 cm dos 80,300.00
Ubin PC Warna 30 x 30 cm dos 88,700.00
Paving blok Bh 3,500.00
Ubin abu-abu Bh 3,900.00
Pengisi nat keramik semen instan Kg 20,900.00
Penutup Keramik Bh 2,200.00
Tempat Sabun TS-1 Bh 39,500.00
Tempat Sabun + Sikat Gigi Bh 90,400.00
Tegel Keramik
Tegel anti slip 20/20 m2 82,400.00
Tegel putih 20/25 m2 80,300.00
Tegel putih 20/20 m2 73,400.00
13 BAHAN BESI
Besi beton (polos) kg 13,560.00
Besi beton (ulir) kg 14,230.00
DAFTAR HARGA SATUAN UPAH KERJA
Harga Satuan
No. Uraian Satuan
( Rp )
Besi beton (WF) kg 19,770.00
Bondeks / Plat Besi Bondeks m2 149,440.00
BESI POLOS (BANCI/PASARAN)
Besi beton dia 6 mm (9 M) stap 12,300.00
Besi beton dia 8 mm (9 M) stap 17,100.00
Besi beton dia 10 mm (9 M) stap 24,500.00
Besi beton dia 12 mm (9 M) stap 42,900.00
Besi beton dia 16 mm (9 M) stap 68,300.00
BESI POLOS (STANDAR)
Besi beton dia 6 mm (12 M) stap 24,500.00
Besi beton dia 8 mm (12 M) stap 38,500.00
Besi beton dia 10 mm (12 M) stap 62,400.00
Besi beton dia 12 mm (12 M) stap 98,900.00
Besi beton dia 16 mm (12 M) stap 183,200.00
Besi beton dia 19 mm (12 M) stap 297,400.00
Besi beton dia 22 mm (12 M) stap 427,200.00
Besi beton dia 25 mm (12 M) stap 551,600.00
Besi beton dia 32 mm (12 M) stap -
BESI ULIR
Besi beton dia 10 mm (12 M) stap 62,400.00
Besi beton dia 12 mm (12 M) stap 98,900.00
Besi beton dia 16 mm (12 M) stap 183,200.00
Besi beton dia 19 mm (12 M) stap 297,400.00
Besi beton dia 22 mm (12 M) stap 427,200.00
Besi beton dia 25 mm (12 M) stap 551,600.00
BESI STREEP
Besi strip tebal 5 mm kg 27,600.00
Besi strip 4 cm x 2 mm / 6 m stap 39,700.00
Besi strip 5 cm x 2 mm / 6 m stap 97,700.00
Besi strip 4 cm x 2,5 mm / 6 m stap 50,100.00
Besi strip 4 cm x 3 mm / 6 m stap 80,600.00
Besi strip 6 cm x 3 mm / 6 m stap 105,000.00
Besi strip 4 cm x 4 mm / 6 m stap 67,800.00
Besi strip 6 cm x 4 mm / 6 m stap 81,900.00
Besi strip 5 cm x 5 mm / 6 m stap 93,200.00
Plat Eser 122 x 244 tbl. 1,0 mm m2 299,100.00
Plat Eser 122 x 244 tbl. 1,2 mm m2 396,700.00
Plat Eser 122 x 244 tbl. 1,5 mm m2 463,800.00
Plat Eser 122 x 244 tbl. 1,8 mm m2 463,800.00
Plat Eser 122 x 244 tbl. 2,0 mm m2 567,500.00
BESI SIKU
Besi siku 30 x 30 x 3 cm stap 137,400.00
Besi siku 40 x 40 x 4 cm stap 190,500.00
Besi siku 50 x 50 x 5 cm (stdr) stap 194,200.00
Besi siku 50 x 50 x 5 cm (banci) stap 103,800.00
BESI HOLLOW
Besi hollow 2/4 cm x 0,3 mm (L = 4 m) galvalum stap 73,400.00
Besi hollow 4/4 cm x 0,3 mm (L = 4 m) galvalum stap 93,200.00
Rangka baja ringan Zimcalume C 75/80 M2 192,100.00
Rangka baja ringan Zimcalume C 75/100 M2 197,700.00
hollow 2/4 cm M' 18,300.00
hollow 4/4 cm M' 23,300.00
BESI UNP & BESI CNP/KANAL C
Besi UNP 5 cm stap 254,200.00
Besi UNP 5 cm stap 254,200.00
Besi UNP 5 cm stap 254,200.00
Besi Kanal UNP Kg 16,000.00
Besi Kanal (Utk. 50x38x5x6 meter), berat 31 kg stap 419,300.00
Besi Kanal (Utk. 150x75x7,5x6 meter), berat 112 kg stap 1,506,700.00
Besi Kanal (Utk. 200x75x8,5x12 meter), berat 310 kg stap 4,164,500.00
BESI BESI WIREMES ROL BRC SNI
M4, Wiermaesh Roll BRC Standard SNI Rol 1,891,600.00
M5, Wiermaesh Roll BRC Standard SNI Rol 2,782,300.00
M6, Wiermaesh Roll BRC Standard SNI Rol 3,880,600.00
DAFTAR HARGA SATUAN UPAH KERJA
Harga Satuan
No. Uraian Satuan
( Rp )
M7, Wiermaesh Roll BRC Standard SNI Rol 5,247,400.00
BESI PIPA GIV
Pipa GIP Medium A dia. 1/2" x 6 m' stad 163,800.00
Pipa GIP Medium A dia. 3/4" x 6 m' stad 209,000.00
Pipa GIP Medium A dia. 1" x 6 m' stad 282,500.00
Pipa GIP Medium A dia. 1 1/2" x 6 m' stad 398,300.00
Pipa GIP Medium A dia. 2" x 6 m' stad 514,100.00
Pipa GIP Medium A dia. 3" x 6 m' stad 853,100.00
Pipa GIP Medium A dia. 4" x 6 m' stad 1,276,900.00
RANGKA BAJA RINGAN
Kap 0,65 mm Btg 116,100.00
Kap 0,75 mm Btg 152,600.00
Reng 32 (kecil) Btg 61,200.00
Reng 34 (besar) Btg 67,300.00
Sekrup Reng Btg 2,000.00
Sekrup Baja Btg 2,700.00
Pemasangan Rangka Atap Lengkap m2 354,000.00
15 BAHAN KAWAT
Kawat beton (bendrat) kg 20,900.00
Nyamuk plastik (kasa) M2 10,600.00
Nyamuk kawat (besi) M2 21,500.00
Harmonika jos M2 36,700.00
Saringan pasir (ayakan) M2 23,200.00
Kawat duri (35 m') rol 91,600.00
Kawat bronjong 4 mm (uk. 1m x 2m x 0,5m') bh 401,100.00
Kawat bronjong 3 mm (uk. 1m x 2m x 0,5m') bh 372,900.00
Kawat angin / ram M' 30,600.00
Kawat las kg 39,000.00
Kawat putih (rol kecil) rol 585,900.00
Kawat putih (rol besar) rol 793,300.00
Kawat ayakan M2 25,400.00
DAFTAR HARGA SATUAN UPAH KERJA
Harga Satuan
No. Uraian Satuan
( Rp )
16 BAHAN LANGIT-LANGIT
Tripleks 3 mm uk. 120 x 240 cm lbr 73,300.00
Tripleks 4 mm uk. 120 x 240 cm lbr 88,700.00
Tripleks 6 mm uk. 120 x 240 cm lbr 97,700.00
Tripleks 9 mm uk. 120 x 240 cm lbr 195,300.00
Tripleks 12 mm uk. 120 x 240 cm lbr 244,100.00
Tripleks 15 mm uk. 120 x 240 cm lbr 305,200.00
Tripleks 18 mm uk. 120 x 240 cm lbr 311,400.00
Multipleks 10 mm lbr 161,900.00
Multipleks 12 mm lbr 195,300.00
Plywood 3 mm uk. 120 x 240 cm lbr 135,700.00
Plywood 9 mm uk. 120 x 240 cm lbr 185,600.00
Teakwood 120 x 240 mm (3 mm) 3 x 7 lbr 82,400.00
Teakwood 120 x 240 mm (3 mm) 4 x 8 lbr 88,700.00
Formika polos 4 x 8 lbr 94,200.00
Formika polos 3 x 6 lbr 250,900.00
Formika warna 4 x 8 lbr 250,900.00
Formika warna 3 x 6 lbr 130,100.00
Gypsum jaya board 9 mm, (120 x 240 cm) lbr 85,500.00
Gypsum elephan board 9 mm, (120 x 240 cm) lbr 85,500.00
Exaboard 6 mm uk. 120 x 240 cm lbr 81,300.00
Kalsiboard 6 mm uk. 120 x 240 cm lbr 81,300.00
Papan kayu (lambersering) lbr 37,500.00
List plafond kayu profil (3cm / 4 M') lbr 24,500.00
List plafond kayu profil (4cm / 4 M') lbr 24,500.00
List plafond kayu profil (5cm / 4 M') lbr 38,000.00
List plafond kayu profil (6cm / 4 M') lbr 38,000.00
List plafond kayu (1 cm x 3 cm /4 M') lbr 22,000.00
List plafond kayu (1 cm x 4 cm /4 M') lbr 22,000.00
List Gypsum motif piano (7/10 cm) lbr 36,700.00
List Gypsum motif biji beton (7/7 cm) lbr 22,000.00
List Gypsum motif kipas (13/15 cm) lbr 36,700.00
List Gypsum motif kangkung (7/10 cm) lbr 24,500.00
List Gypsum motif kumis kucing (7/10 cm) lbr 24,500.00
List profil Pvc K-1 (panjang 2 meter) lbr 31,800.00
List profil Pvc K-2 (panjang 2 meter) lbr 24,500.00
List profil Pvc K-3 (panjang 2 meter) lbr 24,500.00
List profil Pvc K-4 (panjang 2 meter) lbr 24,500.00
List profil Pvc K-5 (panjang 2 meter) lbr 24,500.00
GRC board 4 mm uk. 120 x 240 cm lbr 71,000.00
GRC board 6 mm uk. 120 x 240 cm lbr 127,100.00
GRC board 9 mm uk. 120 x 240 cm lbr 175,000.00
Taco HPL uk. 120 x 240 cm lbr 297,000.00
Wallpaper motif stdr (uk. 0,50 x 10 m) rol 252,100.00
Wallpaper motif khusus (uk. 1,06 x 15,60 m) rol 373,700.00
17 BAHAN KACA
Colour tebal 3 mm m2 185,600.00
Colour tebal 5 mm m2 231,900.00
Polos tebal 3 mm (uk. 122 x 152 cm) m2 158,700.00
Polos tebal 5 mm (uk. 122 x 152 cm) m2 219,700.00
Polos tebal 8 mm m2 213,600.00
Polos tebal 10 mm m2 246,900.00
Polos tebal 12 mm m2 322,000.00
Es / kembang tebal 3 mm m2 259,900.00
Es / kembang tebal 5 mm m2 322,000.00
Buram tebal 3 mm m2 170,900.00
Buram tebal 5 mm m2 185,600.00
Rayband tebal 3 mm (uk. 122 x 152 cm) m2 268,400.00
Rayband tebal 5 mm (uk. 122 x 152 cm) m2 213,600.00
Clear tempered tebal 5 mm m2 256,500.00
Clear tempered tebal 6 mm m2 327,200.00
Clear tempered tebal 8 mm m2 471,800.00
DAFTAR HARGA SATUAN UPAH KERJA
Harga Satuan
No. Uraian Satuan
( Rp )
Clear tempered tebal 10 mm m2 555,900.00
Clear tempered tebal 12 mm m2 623,700.00
Sticker Sandblast (buram es) m2 77,900.00
Sticker Sandblast (biasa) m2 38,900.00
18 BAHAN LISTRIK
Kabel Eterna NYM 2 x 1,5 mm m' 6,800.00
Kabel Eterna NYM 3 x 1,5 mm m' 9,900.00
Kabel Eterna NYM 2 x 2.5 mm m' 9,900.00
Kabel Eterna NYM 3 x 2.5 mm m' 12,300.00
Kabel Eterna NYM 4 x 2.5 mm m' 16,600.00
Kabel NYY 2 x 1.5 mm m' 10,600.00
Kabel NYY 2 x 2.5 mm m' 14,200.00
Kabel NYY 3 x 1.5 mm m' 12,900.00
Kabel NYY 3 x 2.5 mm m' 17,800.00
Kabel NYY 4 x 2.5 mm m' 20,900.00
Kabel Feeder NFGBY 4 x 6 mm m' 80,600.00
Kabel NGA uk. 1,5 mm m' 2,700.00
Kabel NGA uk. 2,5 mm m' 3,700.00
Sekering 1 phase bh 61,200.00
Sekering 2 phase bh 87,500.00
Sekring Batu bh 5,900.00
Fuse Box Broco bh 42,900.00
Kap Sekring bh 7,300.00
Steker gepeng broco bh 3,700.00
Steker AC panasonic bh 24,500.00
Steker AC arde broco bh 24,500.00
Steker bestram steker arde bh 10,600.00
Bestram over steker bh 21,500.00
TE arde yosida bh 24,500.00
TE gepeng broco bh 7,400.00
TE serbaguna loyal bh 24,500.00
Viting tempel merk broco bh 10,600.00
Viting tempel Dexta bh 7,400.00
Fitting Plafond Broco bh 32,500.00
Fitting Segi New Broco bh 10,600.00
Lampu neon (komplit) TL 10 watt bh 58,700.00
Lampu neon (komplit) TL 20 watt bh 119,700.00
Lampu neon (komplit) TL 40 watt bh 146,500.00
Lampu Down light 14 watt bh 152,500.00
Lampu Down light 11 watt bh 129,900.00
Lampu pijar 15 watt + vitting bh 8,100.00
Lampu pijar 60 watt bh 9,900.00
Lampu pijar 75 watt bh 10,600.00
TL bulat 10 watt (komplit) bh 32,700.00
TL bulat 20 watt (komplit) bh 67,800.00
Lampu Philips 11 watt bh 33,700.00
Lampu Philips 18 watt bh 40,900.00
Lampu Philips 23 watt bh 50,100.00
Stop Kontak bh 13,500.00
Saklar Ganda bh 16,600.00
Saklar Tunggal bh 12,300.00
Stop Kontak AC bh 80,600.00
Titik lampu ttk 395,500.00
MCB 4 ampere powell (asli) bh 43,500.00
MCB 6 ampere powell (asli) bh 58,700.00
MCB 10 ampere powell (asli) bh 58,700.00
MCB 16 ampere powell (asli) bh 58,700.00
Box MCB 1 unit (biasa) bh 11,300.00
Box MCB 2 unit (masako) bh 22,600.00
Box MCB 4 unit (masako) bh 42,900.00
Box MCB 6 unit (masako) bh 65,500.00
Pipa Conduit / Pipa Listrik M' 4,200.00
Tee dos bh 6,200.00
DAFTAR HARGA SATUAN UPAH KERJA
Harga Satuan
No. Uraian Satuan
( Rp )
Jack A bh 15,400.00
Selotif dos 14,800.00
Round Cable clip size : 8 mm dos 13,500.00
Round Cable clip size : 9 mm dos 16,900.00
Round Cable clip size : 10 mm dos 19,700.00
Lampu Taman + perlengkapan bh 423,700.00
Kap lampu plafond gypsum 5" (philips) bh 90,400.00
Kap lampu plafond gypsum 4" (philips) bh 79,100.00
Exhause fan plafond (KM/Toilet/Lavatory) Unit 519,800.00
Wall Fan [Kipas Angin Dinding] Unit 463,300.00
Pemadam Api Yamato 3 kg bh 974,600.00
Pemadam Api Yamato 4,5 kg bh 1,455,400.00
Pemadam Api Yamato 6 kg bh 1,884,200.00
Pemadam Api Yamato 9 kg bh 2,274,100.00
AC 5PK Floor Standind (merk ; Polytron) bh 19,824,200.00
AC 3PK Floor Standind (merk ; Polytron) bh 13,337,300.00
AC 2PK Floor Standind (merk ; Polytron) bh 10,609,200.00
AC 5PK Floor Standind (merk ; Panasonic) bh 30,191,000.00
AC 3PK Floor Standind (merk ; Panasonic) bh 21,642,900.00
AC 3PK Floor Standind (merk ; Panasonic) bh 21,642,900.00
AC 2PK Split (merk ; LG) bh 8,507,200.00
AC 1,5PK Split (merk ; LG) bh 6,184,600.00
AC 1PK Split (merk ; LG) bh 4,847,700.00
AC 0,5PK Split (merk ; LG) bh 4,584,400.00
AC 2PK Split (merk ; Panasonic) bh 8,149,300.00
AC 1,5PK Split (merk ; Panasonic) bh 6,214,700.00
AC 1PK Split (merk ; Panasonic) bh 4,751,700.00
AC 0,5PK Split (merk ; Panasonic) bh 4,509,900.00
AC 2PK Split (merk ; Polytron) bh 5,926,000.00
AC 1,5PK Split (merk ; Polytron) bh 4,576,500.00
AC 1PK Split (merk ; Polytron) bh 3,722,200.00
AC 0,5PK Split (merk ; Polytron) bh 3,234,000.00
AC 5PK Floor Standind (merk ; Sharp) bh 25,002,900.00
Sound System Indoor (Lux ; Yamaha+Auderpro) Unit 280,825,000.00
Sound System Indoor (Premium ; Yamaha+Auderpro) Unit 154,643,300.00
Sound System Indoor (merk ; HK Audio) Unit 514,183,600.00
Sound System Indoor (merk ; ARRAY Audiocenter) Unit 526,003,500.00
19 BAHAN SANITAIR
Kloset jongkok lokal (merk continental) bh 124,300.00
Kloset jongkok (INA/sejenis) bh 429,400.00
Kloset jongkok (american standart) bh 429,400.00
Kloset duduk toto (tanpa tabung) unit 854,300.00
Kloset duduk toto (pakai tabung) unit 2,806,900.00
Kloset duduk american standart (pakai tabung) unit 2,623,800.00
Kloset duduk lengkap (merk INA) unit 1,050,900.00
Kloset duduk PARMA (pakai tabung) unit 1,220,400.00
Kloset duduk toto (CV660PJ/SW660J) unit 3,051,000.00
Kloset duduk toto (CV668J/SW668J) unit 3,905,200.00
Wastafel (amerikan Standart) bh 457,800.00
Wastafel (warna/keramik) bh 457,800.00
Wastafel (warna/keramik) setara KW.1 bh 1,830,600.00
Tempat cuci 1 lubang bh 341,200.00
Tempat cuci 2 lubang bh 610,200.00
Urinoir lokal putih bh 1,037,300.00
Urinoir keramik bh 2,135,700.00
Shower kls A unit 457,600.00
Shower kls B unit 274,800.00
Shower klosed unit 237,400.00
Saringan air besi bh 110,700.00
Saringan air plastik bh 61,200.00
Kran Air 3/4" bh 25,900.00
Kran Air 1/2" bh 18,600.00
Tempat sabun tempel bh 61,200.00
Soap Dispenser bh 122,100.00
Pipa PVC/Pipa Plastik
Pipa PVC maspion AW dia. 1/2" x 4 m btg 37,200.00
Pipa PVC maspion AW dia. 3/4" x 4 m btg 44,000.00
Pipa PVC maspion AW dia. 1" x 4 m btg 56,500.00
Pipa PVC maspion AW dia. 1 1/2" x 4 m btg 96,000.00
Pipa PVC maspion AW dia. 2" x 4 m btg 149,100.00
Pipa PVC maspion AW dia. 2 1/2" x 4 m btg 186,400.00
Pipa PVC maspion AW dia. 3" x 4 m btg 254,200.00
Pipa PVC maspion AW dia. 4" x 4 m btg 333,300.00
Pipa PVC Wavin AW dia. 1/2" x 4 m btg 22,600.00
Pipa PVC Wavin AW dia. 3/4" x 4 m btg 29,300.00
Pipa PVC Wavin AW dia. 1" x 4 m btg 39,500.00
Pipa PVC Wavin AW dia. 1 1/2" x 4 m btg 56,500.00
Pipa PVC Wavin AW dia. 2" x 4 m btg 84,700.00
Pipa PVC Wavin AW dia. 2 1/2" x 4 m btg 113,000.00
Pipa PVC Wavin AW dia. 3" x 4 m btg 141,200.00
Pipa PVC Wavin AW dia. 4" x 4 m btg 146,900.00
Pipa PVC Wavin AW dia. 5" x 4 m btg 152,500.00
Pipa PVC DV dia. 1/2" x 4 m m' 10,400.00
Pipa PVC DV dia. 3/4" x 4 m m' 12,100.00
Pipa PVC DV dia. 1" x 4 m m' 14,100.00
DAFTAR HARGA SATUAN UPAH KERJA
Harga Satuan
No. Uraian Satuan
( Rp )
Pipa PVC DV dia. 1 1/2" x 4 m m' 15,800.00
Pipa PVC DV dia. 2" x 4 m m' 17,500.00
Pipa PVC DV dia. 2 1/2" x 4 m m' 28,800.00
Pipa PVC DV dia. 3" x 4 m m' 40,200.00
Pipa PVC DV dia. 4" x 4 m m' 51,700.00
20 BAHAN JALAN
Aspal Pertamina (150 kg) drum 1,186,500.00
Aspal dingin drum 1,529,500.00
Aspal emulsi drum 1,761,300.00
Agregat kasar m3 279,600.00
Agregat halus m3 310,700.00
Filler kg 2,200.00
Gravel m3 279,600.00
Minyak tanah ltr 3,900.00
Bensin ltr 9,000.00
Solar ltr 8,400.00
Thiner ltr 32,700.00
Minyak pelumas (oli) ltr 39,500.00
Cat marka (non termoplas) kg 113,000.00
Cat marka (termoplastic) kg 197,700.00
Plastik filler m2 35,000.00
Pipa galvanis Medium B dia. 2" btg 346,900.00
Pipa porus dia. 4" m' 54,800.00
Geotextile m2 39,500.00
Bahan agregat base kkelas A m3 395,500.00
Bahan agregat base kkelas B m3 367,200.00
Bahan agregat base kkelas C m3 339,000.00
DAFTAR HARGA SATUAN UPAH KERJA
Harga Satuan
No. Uraian Satuan
( Rp )
Gebalan rumput m2 33,900.00
Glass bead kg 96,000.00
Pelat rambu (eng. grade) bh 226,000.00
Pelat rambu (high I grade) m' 282,500.00
Rel pengaman m' 621,500.00
Pemantul cahaya (reflector) bh 63,200.00
Minyak bekisting ltr 12,400.00
Expansion Joint Tipe Baja Bersudut m' 678,000.00
Perletakan Elastomerik Sintetis Ukuran (400x450x45 mm) bh 2,147,000.00
21 BAHAN PAKU
Paku ukuran 1 - 4 cm kg 23,400.00
Paku 5 cm - 12 cm kg 21,400.00
Paku zink kg 28,100.00
Paku jembatan kg 28,200.00
Paku campur kg 27,000.00
Paku beton warna putih 2 - 12 cm dos 44,400.00
Paku beton warna hitam 3 - 7 cm dos 44,400.00
Paku biasa kg 23,900.00
Paku tripleks kg 31,000.00
Paku/Sekrup genteng dos 30,000.00
Paku Sekrup Gypsum 2 - 5 cm dos 27,100.00
Baut 1/2" (6 - 25 cm) bh 33,900.00
Skrup fixer bh 1,600.00
22 BAHAN LEM
Sealant (lem kaca/lem kayu 32 gram, 85 gram) tube 17,700.00
Lem kayu mrek Epoxy kg 169,500.00
Lem karpet talang (merk tiber frog) tube 16,900.00
Lem fiber glass (merk nuri lem super) tube 19,700.00
Lem besi (dextone epoxy adhe sives 48 gram) tube 16,900.00
Lem pipa (merk isarplas 45 gram) tube 11,300.00
23 BAHAN FINISHING
Air ltr 50.00
Amplas kayu / besi lbr 5,600.00
Dempul kg 22,600.00
Spirtus btl 20,300.00
Minyak cat ltr 32,700.00
Politur ltr 56,500.00
Teak oil kg 48,000.00
Okir kg 22,600.00
Menie kayu kg 28,200.00
Menie besi kg 28,200.00
Cat besi kg 64,900.00
Cat menie kg 39,500.00
Cat dasar (cat minyak) kg 61,000.00
Cat warna (cat penutup/cat minyak) kg 61,000.00
Cat warna "gloteks" kg 61,000.00
Cat warna "Nippe 2000" kg 73,400.00
Cat tembok anti lumut ((wathershield)) kg 50,800.00
Cat tembok kg 28,200.00
Cat menie kg 39,500.00
Plamir tembok kg 8,700.00
Pelitur kg 31,000.00
Minyak bekisting ltr 12,400.00
Ijuk lbr 33,900.00
Kwas Cat Pcs 11,800.00
Kwas Rol Pcs 21,700.00
Residu / Ter Galon 33,900.00
Cat Tembok
Kapur api kg 10,100.00
Plamir tembok kg 8,700.00
DAFTAR HARGA SATUAN UPAH KERJA
Harga Satuan
No. Uraian Satuan
( Rp )
Metrolite kelas A kg 39,500.00
Metrolite kelas B kg 29,300.00
Mowilex kelas A kg 100,000.00
Mowilex kelas B kg 60,000.00
Dulux Weathershield-A 918 kg 118,600.00
Dulux Pantalite-A 922 kg 71,100.00
Cat Aqua pro (tembok) kg 42,300.00
Cat Waterproof kg 70,000.00
Cat Avitex kg 33,900.00
Cat Anti bocor no drob kg 57,600.00
Addition addibond kg 49,100.00
Waterproofing SIKA 1 kg kg 61,600.00
Waterproofing SIKA 4 kg galon 214,700.00
Waterproofing SIKA 20 kg zak 983,100.00
Selang
Selang "Nipon" 1/2" m 10,100.00
Selang "Nipon" 1/4" m 10,100.00
Biasa 1/2" m 8,100.00
Palu
Palu besar 6 kg bh 84,700.00
Palu sedang bh 45,200.00
Palu kecil bh 39,500.00
DAFTAR HARGA SATUAN UPAH PEKERJA & SATUAN BAHAN KOTA AMBON
SEMESTER : II, TAHUN ANGGARAN 2016
KECAMATAN TELUK AMBON BAGUALA (Triwulan II, Tahun 2017)
Galian C
MOS Price Overhead Jumlah PPN Total Pembulatan
Ongkos IMB
NO. URAIAN Unit Basic Price 15%
Angkut 20% x (4) x 7+8 3% x (9) 10%
4+5+6 x (7)
bj 10% x 9 9+10+11 "12" dibulatkan
1 2 3 4 5 6 7 8 9 10 11 12 13
0.0% 3.0%
A UPAH KERJA
1 Mandor OH 159,100.00 - - 159,100.00 - 159,100.00 - 15,910.00 175,010.00 175,000.00
2 Mekanik OH 159,100.00 - - 159,100.00 - 159,100.00 - 15,910.00 175,010.00 175,000.00
3 Kepala Tukang OH 136,400.00 - - 136,400.00 - 136,400.00 - 13,640.00 150,040.00 150,000.00
4 Tukang Batu OH 113,700.00 - - 113,700.00 - 113,700.00 - 11,370.00 125,070.00 125,000.00
5 Tukang Kayu OH 113,700.00 - - 113,700.00 - 113,700.00 - 11,370.00 125,070.00 125,000.00
6 Tukang Besi OH 113,700.00 - - 113,700.00 - 113,700.00 - 11,370.00 125,070.00 125,000.00
7 Tukang Cat OH 113,700.00 - - 113,700.00 - 113,700.00 - 11,370.00 125,070.00 125,000.00
8 Pekerja OH 68,200.00 - - 68,200.00 - 68,200.00 - 6,820.00 75,020.00 75,000.00
9 Operator OH 136,400.00 - - 136,400.00 - 136,400.00 - 13,640.00 150,040.00 150,000.00
10 Supir OH 136,400.00 - - 136,400.00 - 136,400.00 - 13,640.00 150,040.00 150,000.00
11 Pembantu (Mekanik,Operator,Supir) OH 77,300.00 - - 77,300.00 - 77,300.00 - 7,730.00 85,030.00 85,000.00
12 Buruh Lapangan terlatih OH 68,200.00 - - 68,200.00 - 68,200.00 - 6,820.00 75,020.00 75,000.00
13 Buruh Lapangan tak terlatih OH 59,100.00 - - 59,100.00 - 59,100.00 - 5,910.00 65,010.00 65,000.00
B. BAHAN BANGUNAN
1 BATU
Batu kali (D.15-30 cm) m3 175,000.00 - 17,500.00 192,500.00 - 192,500.00 5,775.00 19,250.00 217,525.00 217,500.00
Batu belah / kerakal m3 175,000.00 - 17,500.00 192,500.00 - 192,500.00 5,775.00 19,250.00 217,525.00 217,500.00
Batu pecah 5/7 cm m3 235,000.00 - 23,500.00 258,500.00 - 258,500.00 7,755.00 25,850.00 292,105.00 292,100.00
Batu pecah 3/5 cm m3 235,000.00 - 23,500.00 258,500.00 - 258,500.00 7,755.00 25,850.00 292,105.00 292,100.00
Batu pecah 2/3 cm (hrg di stone crusher) m3 660,000.00 - 66,000.00 726,000.00 - 726,000.00 21,780.00 72,600.00 820,380.00 820,300.00
Batu pecah 1/2 cm (hrg di stone crusher) m3 660,000.00 - 66,000.00 726,000.00 - 726,000.00 21,780.00 72,600.00 820,380.00 820,300.00
Batu pecah 0.5/1 cm (hrg di stone crusher) m3 660,000.00 - 66,000.00 726,000.00 - 726,000.00 21,780.00 72,600.00 820,380.00 820,300.00
Batu pecah 15/20 cm m3 235,000.00 - 23,500.00 258,500.00 - 258,500.00 7,755.00 25,850.00 292,105.00 292,100.00
Batu karang m3 175,000.00 - 17,500.00 192,500.00 - 192,500.00 5,775.00 19,250.00 217,525.00 217,500.00
Gravel m3 225,000.00 - 22,500.00 247,500.00 - 247,500.00 7,425.00 24,750.00 279,675.00 279,600.00
Agregat kasar m3 225,000.00 - 22,500.00 247,500.00 - 247,500.00 7,425.00 24,750.00 279,675.00 279,600.00
Abu Batu (hrg di stone crusher) m3 250,000.00 - 25,000.00 275,000.00 - 275,000.00 8,250.00 27,500.00 310,750.00 310,700.00
2 KERIKIL
Kerikil beton m3 235,000.00 - 23,500.00 258,500.00 - 258,500.00 7,755.00 25,850.00 292,105.00 292,100.00
Kerikil beton (kg) kg 220.00 - 22.00 242.00 - 242.00 7.26 24.20 273.46 273.00
Kerikil pantai m3 235,000.00 - 23,500.00 258,500.00 - 258,500.00 7,755.00 25,850.00 292,105.00 292,100.00
Kerikil sungai/pantai 5/7 cm m3 235,000.00 - 23,500.00 258,500.00 - 258,500.00 7,755.00 25,850.00 292,105.00 292,100.00
Kerikil sungai/pantai 3/5 cm m3 235,000.00 - 23,500.00 258,500.00 - 258,500.00 7,755.00 25,850.00 292,105.00 292,100.00
Kerikil sungai/pantai 2/3 cm m3 250,000.00 - 25,000.00 275,000.00 - 275,000.00 8,250.00 27,500.00 310,750.00 310,700.00
Kerikil sungai/pantai 1/2 cm m3 250,000.00 - 25,000.00 275,000.00 - 275,000.00 8,250.00 27,500.00 310,750.00 310,700.00
SEMESTER : II, TAHUN ANGGARAN 2016
KECAMATAN TELUK AMBON BAGUALA (Triwulan II, Tahun 2017)
Galian C
MOS Price Overhead Jumlah PPN Total Pembulatan
Ongkos IMB
NO. URAIAN Unit Basic Price 15%
Angkut 20% x (4) x 7+8 3% x (9) 10%
4+5+6 x (7)
bj 10% x 9 9+10+11 "12" dibulatkan
Kerikil sungai/pantai 0.5/1 cm m3 250,000.00 - 25,000.00 275,000.00 - 275,000.00 8,250.00 27,500.00 310,750.00 310,700.00
3 PASIR / TANAH
Pasir urug m3 140,000.00 - 14,000.00 154,000.00 - 154,000.00 4,620.00 15,400.00 174,020.00 174,000.00
Pasir pasangan / beton m3 175,000.00 - 17,500.00 192,500.00 - 192,500.00 5,775.00 19,250.00 217,525.00 217,500.00
Pasir pasangan / beton (kg) kg 250.00 - 25.00 275.00 - 275.00 8.25 27.50 310.75 310.00
Pasir kasar m3 140,000.00 - 14,000.00 154,000.00 - 154,000.00 4,620.00 15,400.00 174,020.00 174,000.00
Pasir gunung m3 140,000.00 - 14,000.00 154,000.00 - 154,000.00 4,620.00 15,400.00 174,020.00 174,000.00
Sirtu m3 150,000.00 - 15,000.00 165,000.00 - 165,000.00 4,950.00 16,500.00 186,450.00 186,400.00
Tanah urug m3 120,000.00 - 12,000.00 132,000.00 - 132,000.00 3,960.00 13,200.00 149,160.00 149,100.00
Tanah timbunan m3 120,000.00 - 12,000.00 132,000.00 - 132,000.00 3,960.00 13,200.00 149,160.00 149,100.00
Bahan pilihan m3 250,000.00 - 25,000.00 275,000.00 - 275,000.00 8,250.00 27,500.00 310,750.00 310,700.00
Agregat Halus m3 250,000.00 - 25,000.00 275,000.00 - 275,000.00 8,250.00 27,500.00 310,750.00 310,700.00
Agregat Base Kelas A m3 350,000.00 - 35,000.00 385,000.00 - 385,000.00 11,550.00 38,500.00 435,050.00 435,000.00
Agregat Base Kelas B m3 325,000.00 - 32,500.00 357,500.00 - 357,500.00 10,725.00 35,750.00 403,975.00 403,900.00
Agregat Base Kelas C m3 300,000.00 - 30,000.00 330,000.00 - 330,000.00 9,900.00 33,000.00 372,900.00 372,900.00
Air Kerja m3 50.00 - 5.00 55.00 - 55.00 1.65 5.50 62.15 62.00
5 KAPUR ADUK
Kapur api kg 9,000.00 - - 9,000.00 - 9,000.00 270.00 900.00 10,170.00 10,100.00
6 SEMEN
Semen PC 50 kg sak 67,000.00 1,000.00 - 68,000.00 - 68,000.00 2,040.00 6,800.00 76,840.00 76,800.00
Semen tonasa 50 kg sak 67,000.00 1,000.00 - 68,000.00 - 68,000.00 2,040.00 6,800.00 76,840.00 76,800.00
Semen PC kg 1,340.00 100.00 - 1,440.00 - 1,440.00 43.20 144.00 1,627.20 1,620.00
Semen putih Jaguar 40 kg sak 115,000.00 1,000.00 - 116,000.00 - 116,000.00 3,480.00 11,600.00 131,080.00 131,000.00
Semen warna (0,7 kg) kg 16,000.00 100.00 - 16,100.00 - 16,100.00 483.00 1,610.00 18,193.00 18,100.00
Semen putih kg 3,300.00 100.00 - 3,400.00 - 3,400.00 102.00 340.00 3,842.00 3,800.00
7 BATAKO CETAK
Batako uk. 20x40x10 cm (comblok) pcs 3,000.00 - - 3,000.00 - 3,000.00 90.00 300.00 3,390.00 3,300.00
Kualitas I (pres) pcs 2,500.00 - - 2,500.00 - 2,500.00 75.00 250.00 2,825.00 2,800.00
Kualitas II (tangan) pcs 2,000.00 - - 2,000.00 - 2,000.00 60.00 200.00 2,260.00 2,200.00
Diding rester(terawang) bh 51,000.00 - - 51,000.00 - 51,000.00 1,530.00 5,100.00 57,630.00 57,600.00
Batu alam andesit polos (tempel) m2 165,375.00 - - 165,375.00 - 165,375.00 4,961.25 16,537.50 186,873.75 186,800.00
Batu alam candi hitam m2 135,000.00 - - 135,000.00 - 135,000.00 4,050.00 13,500.00 152,550.00 152,500.00
Batu alam palimanan m2 111,375.00 - - 111,375.00 - 111,375.00 3,341.25 11,137.50 125,853.75 125,800.00
8 BAHAN ATAP
Genteng asbes lbr 40,000.00 - - 40,000.00 - 40,000.00 1,200.00 4,000.00 45,200.00 45,200.00
Bubungan asbes m' 37,000.00 - - 37,000.00 - 37,000.00 1,110.00 3,700.00 41,810.00 41,800.00
Genteng rainbouw/berpasir lbr 55,000.00 - - 55,000.00 - 55,000.00 1,650.00 5,500.00 62,150.00 62,100.00
Bubungan genteng rainbouw/berpasir m' 77,500.00 - - 77,500.00 - 77,500.00 2,325.00 7,750.00 87,575.00 87,500.00
Genteng Metal Colour lbr 55,000.00 - - 55,000.00 - 55,000.00 1,650.00 5,500.00 62,150.00 62,100.00
Bubungan genteng Metal colour m' 77,500.00 - - 77,500.00 - 77,500.00 2,325.00 7,750.00 87,575.00 87,500.00
Zink gelombang BJLS 0.20 (914 x 1829 mm) lbr 46,000.00 - - 46,000.00 - 46,000.00 1,380.00 4,600.00 51,980.00 51,900.00
Zink gelombang BJLS 0.25 (914 x 1829 mm) lbr 60,000.00 - - 60,000.00 - 60,000.00 1,800.00 6,000.00 67,800.00 67,800.00
Zink gelombang BJLS 0.30 (914 x 1829 mm) lbr 70,000.00 - - 70,000.00 - 70,000.00 2,100.00 7,000.00 79,100.00 79,100.00
Zink datar BJLS 0.20 (914 x 1829 mm) lbr 50,000.00 - - 50,000.00 - 50,000.00 1,500.00 5,000.00 56,500.00 56,500.00
Zink datar BJLS 0.25 (914 x 1829 mm) lbr 65,000.00 - - 65,000.00 - 65,000.00 1,950.00 6,500.00 73,450.00 73,400.00
Zink datar BJLS 0.30 (914 x 1829 mm) lbr 72,500.00 - - 72,500.00 - 72,500.00 2,175.00 7,250.00 81,925.00 81,900.00
Atap bitiminius tile + pasang. m2 248,600.00 - - 248,600.00 - 248,600.00 7,458.00 24,860.00 280,918.00 280,900.00
Zink gelombang besar plastik bening lbr 60,000.00 - - 60,000.00 - 60,000.00 1,800.00 6,000.00 67,800.00 67,800.00
Zink gelombang kecil plastik bening lbr 25,000.00 - - 25,000.00 - 25,000.00 750.00 2,500.00 28,250.00 28,200.00
Zink warna BJLS 0.25 lbr 45,000.00 - - 45,000.00 - 45,000.00 1,350.00 4,500.00 50,850.00 50,800.00
Genteng pri. Roof (87 x 83 x 0,25 mm) lbr 38,500.00 - - 38,500.00 - 38,500.00 1,155.00 3,850.00 43,505.00 43,500.00
SEMESTER : II, TAHUN ANGGARAN 2016
KECAMATAN TELUK AMBON BAGUALA (Triwulan II, Tahun 2017)
Galian C
MOS Price Overhead Jumlah PPN Total Pembulatan
Ongkos IMB
NO. URAIAN Unit Basic Price 15%
Angkut 20% x (4) x 7+8 3% x (9) 10%
4+5+6 x (7)
bj 10% x 9 9+10+11 "12" dibulatkan
Genteng sakura roof lbr 47,500.00 - - 47,500.00 - 47,500.00 1,425.00 4,750.00 53,675.00 53,600.00
Bubungan genteng sakura roof lbr 43,000.00 - - 43,000.00 - 43,000.00 1,290.00 4,300.00 48,590.00 48,500.00
Genteng prima roof lbr 40,000.00 - - 40,000.00 - 40,000.00 1,200.00 4,000.00 45,200.00 45,200.00
Bubungan Genteng prima roof lbr 35,000.00 - - 35,000.00 - 35,000.00 1,050.00 3,500.00 39,550.00 39,500.00
Atap Gelombang Go Green (uk. 180 x 80) lbr 42,500.00 - - 42,500.00 - 42,500.00 1,275.00 4,250.00 48,025.00 48,000.00
Atap Gelombang Go Green (uk. 210 x 80) lbr 53,000.00 - - 53,000.00 - 53,000.00 1,590.00 5,300.00 59,890.00 59,800.00
Atap Gelombang Go Green (uk. 240 x 80) lbr 62,000.00 - - 62,000.00 - 62,000.00 1,860.00 6,200.00 70,060.00 70,000.00
Atap Gelombang Go Green (uk. 300 x 80) lbr 81,000.00 - - 81,000.00 - 81,000.00 2,430.00 8,100.00 91,530.00 91,500.00
Nok 1 psng 80 cm lbr 55,000.00 - - 55,000.00 - 55,000.00 1,650.00 5,500.00 62,150.00 62,100.00
Sisalation / Alluminium Foil m2 20,000.00 - - 20,000.00 - 20,000.00 600.00 2,000.00 22,600.00 22,600.00
Zink Talang tbl.0,20 uk. Lbr. 85 cm m' 35,000.00 - - 35,000.00 - 35,000.00 1,050.00 3,500.00 39,550.00 39,500.00
Genteng 2 x 5 Multiroof lbr 105,000.00 - - 105,000.00 - 105,000.00 3,150.00 10,500.00 118,650.00 118,600.00
Genteng 1 x 5 Multiroof lbr 96,000.00 - - 96,000.00 - 96,000.00 2,880.00 9,600.00 108,480.00 108,400.00
Genteng 2 x 5 Multicolor lbr 60,000.00 - - 60,000.00 - 60,000.00 1,800.00 6,000.00 67,800.00 67,800.00
Genteng 1 x 5 Multicolor lbr 55,000.00 - - 55,000.00 - 55,000.00 1,650.00 5,500.00 62,150.00 62,100.00
Nok Model U Multiroof lbr 40,000.00 - - 40,000.00 - 40,000.00 1,200.00 4,000.00 45,200.00 45,200.00
Nok Model U Multicolor lbr 38,000.00 - - 38,000.00 - 38,000.00 1,140.00 3,800.00 42,940.00 42,900.00
Nok Model C Multiroof lbr 29,000.00 - - 29,000.00 - 29,000.00 870.00 2,900.00 32,770.00 32,700.00
Nok Model C Multicolor lbr 27,000.00 - - 27,000.00 - 27,000.00 810.00 2,700.00 30,510.00 30,500.00
Nok Samping Multiroof lbr 39,000.00 - - 39,000.00 - 39,000.00 1,170.00 3,900.00 44,070.00 44,000.00
Nok Samping Multicolor lbr 37,500.00 - - 37,500.00 - 37,500.00 1,125.00 3,750.00 42,375.00 42,300.00
Wall Flashing Multiroof lbr 40,000.00 - - 40,000.00 - 40,000.00 1,200.00 4,000.00 45,200.00 45,200.00
Wall Flashing Multicolor lbr 38,000.00 - - 38,000.00 - 38,000.00 1,140.00 3,800.00 42,940.00 42,900.00
Tutup Nok Multiroof lbr 35,000.00 - - 35,000.00 - 35,000.00 1,050.00 3,500.00 39,550.00 39,500.00
Tutup Nok Multicolor lbr 30,000.00 - - 30,000.00 - 30,000.00 900.00 3,000.00 33,900.00 33,900.00
Atap Sirap Kayu Ulin lbr 5,500.00 - - 5,500.00 - 5,500.00 165.00 550.00 6,215.00 6,200.00
Atap Spandek Zincalume (tbl. 0,3 mm) m2 58,050.00 - - 58,050.00 - 58,050.00 1,741.50 5,805.00 65,596.50 65,500.00
Atap Spandek Zincalume (tbl. 0,35 mm) m2 64,800.00 - - 64,800.00 - 64,800.00 1,944.00 6,480.00 73,224.00 73,200.00
Atap Spandek Zincalume (tbl. 0,4 mm) m2 72,900.00 - - 72,900.00 - 72,900.00 2,187.00 7,290.00 82,377.00 82,300.00
Atap Spandek Zincalume (tbl. 0,45 mm) m2 81,000.00 - - 81,000.00 - 81,000.00 2,430.00 8,100.00 91,530.00 91,500.00
Atap Spandek Zincalume (tbl. 0,5 mm) m2 87,750.00 - - 87,750.00 - 87,750.00 2,632.50 8,775.00 99,157.50 99,100.00
Atap Seng Galvalum Gelombang (0,20mm x 1,8m x 80cm) m2 61,100.00 - - 61,100.00 - 61,100.00 1,833.00 6,110.00 69,043.00 69,000.00
Atap Seng Galvalum Gelombang (0,25 mm x 180 cm) m2 78,000.00 - - 78,000.00 - 78,000.00 2,340.00 7,800.00 88,140.00 88,100.00
Atap Seng Galvalum Gelombang (0,25 mm x 210 cm) m2 89,700.00 - - 89,700.00 - 89,700.00 2,691.00 8,970.00 101,361.00 101,300.00
Atap Seng Galvalum Gelombang (0,25 mm x 240 cm) m2 104,000.00 - - 104,000.00 - 104,000.00 3,120.00 10,400.00 117,520.00 117,500.00
Atap Seng Galvalum Gelombang (0,25 mm x 300 cm) m2 130,000.00 - - 130,000.00 - 130,000.00 3,900.00 13,000.00 146,900.00 146,900.00
Atap Seng Galvalum Gelombang (0,30 mm x 180 cm) m2 88,400.00 - - 88,400.00 - 88,400.00 2,652.00 8,840.00 99,892.00 99,800.00
Atap Seng Galvalum Gelombang (0,30 mm x 210 cm) m2 104,000.00 - - 104,000.00 - 104,000.00 3,120.00 10,400.00 117,520.00 117,500.00
Atap Seng Galvalum Gelombang (0,30 mm x 240 cm) m2 117,000.00 - - 117,000.00 - 117,000.00 3,510.00 11,700.00 132,210.00 132,200.00
Atap Seng Galvalum Gelombang (0,30 mm x 300 cm) m2 146,900.00 - - 146,900.00 - 146,900.00 4,407.00 14,690.00 165,997.00 165,900.00
9 BAHAN KAYU
Kayu kls I m3 7,000,000.00 - - 7,000,000.00 - 7,000,000.00 210,000.00 700,000.00 7,910,000.00 7,910,000.00
SEMESTER : II, TAHUN ANGGARAN 2016
KECAMATAN TELUK AMBON BAGUALA (Triwulan II, Tahun 2017)
Galian C
MOS Price Overhead Jumlah PPN Total Pembulatan
Ongkos IMB
NO. URAIAN Unit Basic Price 15%
Angkut 20% x (4) x 7+8 3% x (9) 10%
4+5+6 x (7)
bj 10% x 9 9+10+11 "12" dibulatkan
Kayu Kls II m3 2,800,000.00 - - 2,800,000.00 - 2,800,000.0084,000.00 280,000.00 3,164,000.00 3,164,000.00
Kayu Kls III m3 1,800,000.00 - - 1,800,000.00 - 1,800,000.0054,000.00 180,000.00 2,034,000.00 2,034,000.00
Kayu besi (kls I) m3 7,000,000.00 - - 7,000,000.00 - 210,000.00
7,000,000.00 700,000.00 7,910,000.00 7,910,000.00
Kayu uk. 10/10 x 3 m m3 7,000,000.00 - - 7,000,000.00 - 210,000.00
7,000,000.00 700,000.00 7,910,000.00 7,910,000.00
Kayu uk. 6/12 x 3 m m3 7,000,000.00 - - 7,000,000.00 - 210,000.00
7,000,000.00 700,000.00 7,910,000.00 7,910,000.00
Kayu uk. 5/10 x 3 m m3 7,000,000.00 - - 7,000,000.00 - 210,000.00
7,000,000.00 700,000.00 7,910,000.00 7,910,000.00
Kayu Lenggua (Papan kls I) m3 7,000,000.00 - - 7,000,000.00 - 210,000.00
7,000,000.00 700,000.00 7,910,000.00 7,910,000.00
Papan kls II m3 2,800,000.00 - - 2,800,000.00 - 2,800,000.0084,000.00 280,000.00 3,164,000.00 3,164,000.00
Papan 3 cm kls II m3 2,800,000.00 - - 2,800,000.00 - 2,800,000.0084,000.00 280,000.00 3,164,000.00 3,164,000.00
Papan 2 cm kls II m3 2,800,000.00 - - 2,800,000.00 - 2,800,000.0084,000.00 280,000.00 3,164,000.00 3,164,000.00
Papan kayu kls I m3 7,000,000.00 - - 7,000,000.00 - 210,000.00
7,000,000.00 700,000.00 7,910,000.00 7,910,000.00
Papan kayu kls II m3 2,800,000.00 - - 2,800,000.00 - 2,800,000.0084,000.00 280,000.00 3,164,000.00 3,164,000.00
Kayu Makila / Samama 10/10 x 3 m m3 2,800,000.00 - - 2,800,000.00 - 2,800,000.0084,000.00 280,000.00 3,164,000.00 3,164,000.00
Kayu Makila / Samama 5/10 x 3 m m3 2,800,000.00 - - 2,800,000.00 - 2,800,000.0084,000.00 280,000.00 3,164,000.00 3,164,000.00
Dolken Kayu Ø 8 - 10/400 cm btg 42,500.00 1,500.00 - 44,000.00 - 44,000.00 1,320.00 4,400.00 49,720.00 49,700.00
Bambu Ø 10 cm btg 15,000.00 - - 15,000.00 - 15,000.00 450.00 1,500.00 16,950.00 16,900.00
REEF / LAT
Kayu kls I 5/7 x 3 m (Besi) m3 7,000,000.00 - - 7,000,000.00 - 7,000,000.00 210,000.00 700,000.00 7,910,000.00 7,910,000.00
Kayu kls I 3/5 x 3 m (Besi) m3 7,000,000.00 - - 7,000,000.00 - 7,000,000.00 210,000.00 700,000.00 7,910,000.00 7,910,000.00
Kayu kls I 2/3 x 3 m (Besi) m3 7,000,000.00 - - 7,000,000.00 - 7,000,000.00 210,000.00 700,000.00 7,910,000.00 7,910,000.00
Kayu kls II 5/7 x 3 m (Samama) m3 2,800,000.00 - - 2,800,000.00 - 2,800,000.00 84,000.00 280,000.00 3,164,000.00 3,164,000.00
Kayu kls II /3/5 x 3 m (Samama) m3 2,800,000.00 - - 2,800,000.00 - 2,800,000.00 84,000.00 280,000.00 3,164,000.00 3,164,000.00
Kayu kls II /2/3 x 3 m (Samama) m3 2,800,000.00 - - 2,800,000.00 - 2,800,000.00 84,000.00 280,000.00 3,164,000.00 3,164,000.00
10 BAHAN BETON
Pilar pagar pcs 75,000.00 1,500.00 - 76,500.00 - 76,500.00 2,295.00 7,650.00 86,445.00 86,400.00
Pilar pagar beton pcs 75,000.00 1,500.00 - 76,500.00 - 76,500.00 2,295.00 7,650.00 86,445.00 86,400.00
Pilar tiang teras pcs 520,000.00 1,500.00 - 521,500.00 - 521,500.00 15,645.00 52,150.00 589,295.00 589,200.00
Beton K-125 m3 900,000.00 - - 900,000.00 - 900,000.00 27,000.00 90,000.00 1,017,000.00 1,017,000.00
Beton K-175 m3 965,000.00 - - 965,000.00 - 965,000.00 28,950.00 96,500.00 1,090,450.00 1,090,400.00
Beton K-225 m3 1,050,000.00 - - 1,050,000.00 - 1,050,000.00 31,500.00 105,000.00 1,186,500.00 1,186,500.00
Cincin beton diameter dalam 60 cm, tbl. 6 cm/h = 0,50 m Bh 165,000.00 - - 165,000.00 - 165,000.00 4,950.00 16,500.00 186,450.00 186,400.00
Cincin beton diameter dalam 70 cm, tbl. 7 cm/h = 0,50 m Bh 190,000.00 - - 190,000.00 - 190,000.00 5,700.00 19,000.00 214,700.00 214,700.00
Cincin beton diameter dalam 80 cm, tbl. 8 cm/h = 0,50 m Bh 225,000.00 - - 225,000.00 - 225,000.00 6,750.00 22,500.00 254,250.00 254,200.00
Cincin beton diameter dalam 90 cm, tbl. 9 cm/h = 0,50 m Bh 260,000.00 - - 260,000.00 - 260,000.00 7,800.00 26,000.00 293,800.00 293,800.00
Cincin beton diameter dalam 100 cm, tbl. 10 cm/h = 0,50 m Bh 300,000.00 - - 300,000.00 - 300,000.00 9,000.00 30,000.00 339,000.00 339,000.00
Kansten Beton (50x40x15) Bh 85,000.00 - - 85,000.00 - 85,000.00 2,550.00 8,500.00 96,050.00 96,000.00
11 BAHAN LANTAI
Ubin PC Warna 20 x 20 cm dos 67,600.00 - - 67,600.00 - 67,600.00 2,028.00 6,760.00 76,388.00 76,300.00
Ubin PC Warna 20 x 25 cm dos 71,100.00 - - 71,100.00 - 71,100.00 2,133.00 7,110.00 80,343.00 80,300.00
Ubin PC Warna 30 x 30 cm dos 78,500.00 - - 78,500.00 - 78,500.00 2,355.00 7,850.00 88,705.00 88,700.00
Paving blok Bh 3,100.00 - - 3,100.00 - 3,100.00 93.00 310.00 3,503.00 3,500.00
SEMESTER : II, TAHUN ANGGARAN 2016
KECAMATAN TELUK AMBON BAGUALA (Triwulan II, Tahun 2017)
Galian C
MOS Price Overhead Jumlah PPN Total Pembulatan
Ongkos IMB
NO. URAIAN Unit Basic Price 15%
Angkut 20% x (4) x 7+8 3% x (9) 10%
4+5+6 x (7)
bj 10% x 9 9+10+11 "12" dibulatkan
Ubin abu-abu Bh 3,500.00 - - 3,500.00 - 3,500.00 105.00 350.00 3,955.00 3,900.00
Pengisi nat keramik semen instan Kg 18,500.00 - - 18,500.00 - 18,500.00 555.00 1,850.00 20,905.00 20,900.00
Penutup Keramik Bh 2,000.00 - - 2,000.00 - 2,000.00 60.00 200.00 2,260.00 2,200.00
Tempat Sabun TS-1 Bh 35,000.00 - - 35,000.00 - 35,000.00 1,050.00 3,500.00 39,550.00 39,500.00
Tempat Sabun + Sikat Gigi Bh 80,000.00 - - 80,000.00 - 80,000.00 2,400.00 8,000.00 90,400.00 90,400.00
Tegel Keramik
Tegel anti slip 20/20 m2 73,000.00 - - 73,000.00 - 73,000.00 2,190.00 7,300.00 82,490.00 82,400.00
Tegel putih 20/25 m2 71,100.00 - - 71,100.00 - 71,100.00 2,133.00 7,110.00 80,343.00 80,300.00
Tegel putih 20/20 m2 65,000.00 - - 65,000.00 - 65,000.00 1,950.00 6,500.00 73,450.00 73,400.00
Arwana warna 20/20 m2 49,300.00 - - 49,300.00 - 49,300.00 1,479.00 4,930.00 55,709.00 55,700.00
Arwana warna putih 30/30 m2 41,600.00 - - 41,600.00 - 41,600.00 1,248.00 4,160.00 47,008.00 47,000.00
Arwana warna 30/30 m2 41,600.00 - - 41,600.00 - 41,600.00 1,248.00 4,160.00 47,008.00 47,000.00
Arwana warna putih 40/40 m2 42,800.00 - - 42,800.00 - 42,800.00 1,284.00 4,280.00 48,364.00 48,300.00
Mulia warna putih 30/30 m2 52,500.00 - - 52,500.00 - 52,500.00 1,575.00 5,250.00 59,325.00 59,300.00
Mulia warna 30/30 m2 43,800.00 - - 43,800.00 - 43,800.00 1,314.00 4,380.00 49,494.00 49,400.00
Plin Keramik 10/30 dos 49,300.00 - - 49,300.00 - 49,300.00 1,479.00 4,930.00 55,709.00 55,700.00
Tegel warna 40/40 m2 91,900.00 - - 91,900.00 - 91,900.00 2,757.00 9,190.00 103,847.00 103,800.00
Tegel warna 60/60 m2 221,500.00 - - 221,500.00 - 221,500.00 6,645.00 22,150.00 250,295.00 250,200.00
Tegel keramik 25/40 m2 91,900.00 - - 91,900.00 - 91,900.00 2,757.00 9,190.00 103,847.00 103,800.00
Tegel keramik 40/40 m2 91,900.00 - - 91,900.00 - 91,900.00 2,757.00 9,190.00 103,847.00 103,800.00
Tegel Granito 60/60 m2 236,200.00 - - 236,200.00 - 236,200.00 7,086.00 23,620.00 266,906.00 266,900.00
Tegel Granito 50/50 m2 299,900.00 - - 299,900.00 - 299,900.00 8,997.00 29,990.00 338,887.00 338,800.00
Tegel Granito 40/40 m2 224,300.00 - - 224,300.00 - 224,300.00 6,729.00 22,430.00 253,459.00 253,400.00
Tegel Granito 30/30 m2 224,300.00 - - 224,300.00 - 224,300.00 6,729.00 22,430.00 253,459.00 253,400.00
Plint Ubin Granit 10 x 40 cm bh 74,975.00 - - 74,975.00 - 74,975.00 2,249.25 7,497.50 84,721.75 84,700.00
Plint Ubin Granit 10 x 30 cm bh 35,333.33 - - 35,333.33 - 35,333.33 1,060.00 3,533.33 39,926.67 39,900.00
Roman Keramik lantai 20x20 Gol.A m2 102,800.00 - - 102,800.00 - 102,800.00 3,084.00 10,280.00 116,164.00 116,100.00
Roman Keramik lantai 30x30 Gol.C m2 107,100.00 - - 107,100.00 - 107,100.00 3,213.00 10,710.00 121,023.00 121,000.00
Roman Keramik lantai 40x40 Gol.A m2 124,300.00 - - 124,300.00 - 124,300.00 3,729.00 12,430.00 140,459.00 140,400.00
Roman Keramik lantai 45x45 Gol.A m2 124,300.00 - - 124,300.00 - 124,300.00 3,729.00 12,430.00 140,459.00 140,400.00
Roman Keramik lantai 20x20 Gol.B m2 106,000.00 - - 106,000.00 - 106,000.00 3,180.00 10,600.00 119,780.00 119,700.00
Roman Keramik lantai 30x30 Gol.B m2 102,800.00 - - 102,800.00 - 102,800.00 3,084.00 10,280.00 116,164.00 116,100.00
Roman Keramik dinding 20x20 Gol.A m2 102,800.00 - - 102,800.00 - 102,800.00 3,084.00 10,280.00 116,164.00 116,100.00
Roman Keramik dinding 20x25 Gol.A m2 99,500.00 - - 99,500.00 - 99,500.00 2,985.00 9,950.00 112,435.00 112,400.00
Roman Keramik dinding 25x25 Gol.A m2 106,000.00 - - 106,000.00 - 106,000.00 3,180.00 10,600.00 119,780.00 119,700.00
Roman Keramik dinding 30x30 Gol.B m2 100,600.00 - - 100,600.00 - 100,600.00 3,018.00 10,060.00 113,678.00 113,600.00
Keramik Roman 60x60 cm Gol.A (3 pcs) dos 136,200.00 - - 136,200.00 - 136,200.00 4,086.00 13,620.00 153,906.00 153,900.00
Keramik Roman 59x59 cm Gol.A (3 pcs) dos 176,200.00 - - 176,200.00 - 176,200.00 5,286.00 17,620.00 199,106.00 199,100.00
Keramik Roman 50x50 cm Gol.A (4 pcs) dos 199,900.00 - - 199,900.00 - 199,900.00 5,997.00 19,990.00 225,887.00 225,800.00
SEMESTER : II, TAHUN ANGGARAN 2016
KECAMATAN TELUK AMBON BAGUALA (Triwulan II, Tahun 2017)
Galian C
MOS Price Overhead Jumlah PPN Total Pembulatan
Ongkos IMB
NO. URAIAN Unit Basic Price 15%
Angkut 20% x (4) x 7+8 3% x (9) 10%
4+5+6 x (7)
bj 10% x 9 9+10+11 "12" dibulatkan
12 BAHAN BESI
Besi beton (polos) kg 12,000.00 - - 12,000.00 - 12,000.00 360.00 1,200.00 13,560.00 13,560.00
Besi beton (ulir) kg 12,600.00 - - 12,600.00 - 12,600.00 378.00 1,260.00 14,238.00 14,230.00
Besi beton (WF) kg 17,500.00 - - 17,500.00 - 17,500.00 525.00 1,750.00 19,775.00 19,770.00
Bondeks / Plat Besi Bondeks m2 132,250.00 - - 132,250.00 - 132,250.00 3,967.50 13,225.00 149,442.50 149,440.00
BESI POLOS (BANCI/PASARAN)
Besi beton dia 6 mm (9 M) stap 10,900.00 - - 10,900.00 - 10,900.00 327.00 1,090.00 12,317.00 12,300.00
Besi beton dia 8 mm (9 M) stap 15,200.00 - - 15,200.00 - 15,200.00 456.00 1,520.00 17,176.00 17,100.00
Besi beton dia 10 mm (9 M) stap 21,700.00 - - 21,700.00 - 21,700.00 651.00 2,170.00 24,521.00 24,500.00
Besi beton dia 12 mm (9 M) stap 38,000.00 - - 38,000.00 - 38,000.00 1,140.00 3,800.00 42,940.00 42,900.00
Besi beton dia 16 mm (9 M) stap 60,500.00 - - 60,500.00 - 60,500.00 1,815.00 6,050.00 68,365.00 68,300.00
BESI POLOS (STANDAR)
Besi beton dia 6 mm (12 M) stap 21,700.00 - - 21,700.00 - 21,700.00 651.00 2,170.00 24,521.00 24,500.00
Besi beton dia 8 mm (12 M) stap 34,100.00 - - 34,100.00 - 34,100.00 1,023.00 3,410.00 38,533.00 38,500.00
Besi beton dia 10 mm (12 M) stap 55,300.00 - - 55,300.00 - 55,300.00 1,659.00 5,530.00 62,489.00 62,400.00
Besi beton dia 12 mm (12 M) stap 87,600.00 - - 87,600.00 - 87,600.00 2,628.00 8,760.00 98,988.00 98,900.00
Besi beton dia 16 mm (12 M) stap 162,200.00 - - 162,200.00 - 162,200.00 4,866.00 16,220.00 183,286.00 183,200.00
Besi beton dia 19 mm (12 M) stap 263,200.00 - - 263,200.00 - 263,200.00 7,896.00 26,320.00 297,416.00 297,400.00
Besi beton dia 22 mm (12 M) stap 378,100.00 - - 378,100.00 - 378,100.00 11,343.00 37,810.00 427,253.00 427,200.00
Besi beton dia 25 mm (12 M) stap 488,200.00 - - 488,200.00 - 488,200.00 14,646.00 48,820.00 551,666.00 551,600.00
BESI ULIR
Besi beton dia 10 mm (12 M) stap 64,900.00 - - 64,900.00 - 64,900.00 1,947.00 6,490.00 73,337.00 73,300.00
Besi beton dia 12 mm (12 M) stap 89,800.00 - - 89,800.00 - 89,800.00 2,694.00 8,980.00 101,474.00 101,400.00
Besi beton dia 16 mm (12 M) stap 162,200.00 - - 162,200.00 - 162,200.00 4,866.00 16,220.00 183,286.00 183,200.00
Besi beton dia 19 mm (12 M) stap 271,200.00 - - 271,200.00 - 271,200.00 8,136.00 27,120.00 306,456.00 306,400.00
Besi beton dia 22 mm (12 M) stap 379,200.00 - - 379,200.00 - 379,200.00 11,376.00 37,920.00 428,496.00 428,400.00
Besi beton dia 25 mm (12 M) stap 489,400.00 - - 489,400.00 - 489,400.00 14,682.00 48,940.00 553,022.00 553,000.00
BESI STREEP
Besi strip tebal 5 mm kg 24,400.00 100.00 - 24,500.00 - 24,500.00 735.00 2,450.00 27,685.00 27,600.00
Besi strip 4 cm x 2 mm / 6 m stap 35,200.00 - - 35,200.00 - 35,200.00 1,056.00 3,520.00 39,776.00 39,700.00
Besi strip 5 cm x 2 mm / 6 m stap 86,500.00 - - 86,500.00 - 86,500.00 2,595.00 8,650.00 97,745.00 97,700.00
Besi strip 4 cm x 2,5 mm / 6 m stap 44,400.00 - - 44,400.00 - 44,400.00 1,332.00 4,440.00 50,172.00 50,100.00
Besi strip 4 cm x 3 mm / 6 m stap 71,400.00 - - 71,400.00 - 71,400.00 2,142.00 7,140.00 80,682.00 80,600.00
Besi strip 6 cm x 3 mm / 6 m stap 93,000.00 - - 93,000.00 - 93,000.00 2,790.00 9,300.00 105,090.00 105,000.00
Besi strip 4 cm x 4 mm / 6 m stap 60,000.00 - - 60,000.00 - 60,000.00 1,800.00 6,000.00 67,800.00 67,800.00
Besi strip 6 cm x 4 mm / 6 m stap 72,500.00 - - 72,500.00 - 72,500.00 2,175.00 7,250.00 81,925.00 81,900.00
Besi strip 5 cm x 5 mm / 6 m stap 82,500.00 - - 82,500.00 - 82,500.00 2,475.00 8,250.00 93,225.00 93,200.00
Plat Eser 122 x 244 tbl. 1,0 mm m2 264,700.00 - - 264,700.00 - 264,700.00 7,941.00 26,470.00 299,111.00 299,100.00
Plat Eser 122 x 244 tbl. 1,2 mm m2 351,100.00 - - 351,100.00 - 351,100.00 10,533.00 35,110.00 396,743.00 396,700.00
Plat Eser 122 x 244 tbl. 1,5 mm m2 410,500.00 - - 410,500.00 - 410,500.00 12,315.00 41,050.00 463,865.00 463,800.00
Plat Eser 122 x 244 tbl. 1,8 mm m2 410,500.00 - - 410,500.00 - 410,500.00 12,315.00 41,050.00 463,865.00 463,800.00
Plat Eser 122 x 244 tbl. 2,0 mm m2 502,300.00 - - 502,300.00 - 502,300.00 15,069.00 50,230.00 567,599.00 567,500.00
BESI SIKU
SEMESTER : II, TAHUN ANGGARAN 2016
KECAMATAN TELUK AMBON BAGUALA (Triwulan II, Tahun 2017)
Galian C
MOS Price Overhead Jumlah PPN Total Pembulatan
Ongkos IMB
NO. URAIAN Unit Basic Price 15%
Angkut 20% x (4) x 7+8 3% x (9) 10%
4+5+6 x (7)
bj 10% x 9 9+10+11 "12" dibulatkan
Besi siku 30 x 30 x 3 cm stap 121,600.00 - - 121,600.00 - 121,600.00 3,648.00 12,160.00 137,408.00 137,400.00
Besi siku 40 x 40 x 4 cm stap 168,600.00 - - 168,600.00 - 168,600.00 5,058.00 16,860.00 190,518.00 190,500.00
Besi siku 50 x 50 x 5 cm (stdr) stap 171,900.00 - - 171,900.00 - 171,900.00 5,157.00 17,190.00 194,247.00 194,200.00
Besi siku 50 x 50 x 5 cm (banci) stap 91,900.00 - - 91,900.00 - 91,900.00 2,757.00 9,190.00 103,847.00 103,800.00
Besi siku 3 x 3 x 0,30 cm stap 124,300.00 - - 124,300.00 - 124,300.00 3,729.00 12,430.00 140,459.00 140,400.00
Besi siku 4 x 4 x 0,40 cm stap 189,100.00 - - 189,100.00 - 189,100.00 5,673.00 18,910.00 213,683.00 213,600.00
Besi siku 5 x 5 x 0,50 cm stap 297,200.00 - - 297,200.00 - 297,200.00 8,916.00 29,720.00 335,836.00 335,800.00
Besi siku 6 x 6 x 0,60 cm stap 378,100.00 - - 378,100.00 - 378,100.00 11,343.00 37,810.00 427,253.00 427,200.00
BESI HOLLOW
Besi hollow 2/4 cm x 0,3 mm (L = 4 m) galvalum stap 65,000.00 - - 65,000.00 - 65,000.00 1,950.00 6,500.00 73,450.00 73,400.00
Besi hollow 4/4 cm x 0,3 mm (L = 4 m) galvalum stap 82,500.00 - - 82,500.00 - 82,500.00 2,475.00 8,250.00 93,225.00 93,200.00
Rangka baja ringan Zimcalume C 75/80 M2 170,000.00 - - 170,000.00 - 170,000.00 5,100.00 17,000.00 192,100.00 192,100.00
Rangka baja ringan Zimcalume C 75/100 M2 175,000.00 - - 175,000.00 - 175,000.00 5,250.00 17,500.00 197,750.00 197,700.00
hollow 2/4 cm M' 16,250.00 - - 16,250.00 - 16,250.00 487.50 1,625.00 18,362.50 18,300.00
hollow 4/4 cm M' 20,625.00 - - 20,625.00 - 20,625.00 618.75 2,062.50 23,306.25 23,300.00
BESI UNP & BESI CNP/KANAL C
Besi UNP 5 cm stap 225,000.00 - - 225,000.00 - 225,000.00 6,750.00 22,500.00 254,250.00 254,200.00
Besi UNP 5 cm stap 375,000.00 - - 375,000.00 - 375,000.00 11,250.00 37,500.00 423,750.00 423,700.00
Besi UNP 5 cm stap 400,000.00 - - 400,000.00 - 400,000.00 12,000.00 40,000.00 452,000.00 452,000.00
Besi Kanal UNP Kg 14,200.00 - - 14,200.00 - 14,200.00 426.00 1,420.00 16,046.00 16,000.00
Besi Kanal (Utk. 50x38x5x6 meter), berat 31 kg stap 371,100.00 - - 371,100.00 - 371,100.00 11,133.00 37,110.00 419,343.00 419,300.00
Besi Kanal (Utk. 150x75x7,5x6 meter), berat 112 kg stap 1,333,400.00 - - 1,333,400.00 - 1,333,400.00 40,002.00 133,340.00 1,506,742.00 1,506,700.00
Besi Kanal (Utk. 200x75x8,5x12 meter), berat 310 kg stap 3,685,400.00 - - 3,685,400.00 - 3,685,400.00 110,562.00 368,540.00 4,164,502.00 4,164,500.00
BESI BESI WIREMES ROL BRC SNI
M4, Wiermaesh Roll BRC Standard SNI Rol 1,674,000.00 - - 1,674,000.00 - 1,674,000.00 50,220.00 167,400.00 1,891,620.00 1,891,600.00
M5, Wiermaesh Roll BRC Standard SNI Rol 2,462,300.00 - - 2,462,300.00 - 2,462,300.00 73,869.00 246,230.00 2,782,399.00 2,782,300.00
M6, Wiermaesh Roll BRC Standard SNI Rol 3,434,200.00 - - 3,434,200.00 - 3,434,200.00 103,026.00 343,420.00 3,880,646.00 3,880,600.00
M7, Wiermaesh Roll BRC Standard SNI Rol 4,643,800.00 - - 4,643,800.00 - 4,643,800.00 139,314.00 464,380.00 5,247,494.00 5,247,400.00
BESI PIPA GIV
Pipa GIP Medium A dia. 1/2" x 6 m' stad 145,000.00 - - 145,000.00 - 145,000.00 4,350.00 14,500.00 163,850.00 163,800.00
Pipa GIP Medium A dia. 3/4" x 6 m' stad 185,000.00 - - 185,000.00 - 185,000.00 5,550.00 18,500.00 209,050.00 209,000.00
Pipa GIP Medium A dia. 1" x 6 m' stad 250,000.00 - - 250,000.00 - 250,000.00 7,500.00 25,000.00 282,500.00 282,500.00
Pipa GIP Medium A dia. 1 1/2" x 6 m' stad 352,500.00 - - 352,500.00 - 352,500.00 10,575.00 35,250.00 398,325.00 398,300.00
Pipa GIP Medium A dia. 2" x 6 m' stad 455,000.00 - - 455,000.00 - 455,000.00 13,650.00 45,500.00 514,150.00 514,100.00
Pipa GIP Medium A dia. 3" x 6 m' stad 755,000.00 - - 755,000.00 - 755,000.00 22,650.00 75,500.00 853,150.00 853,100.00
Pipa GIP Medium A dia. 4" x 6 m' stad 1,130,000.00 - - 1,130,000.00 - 1,130,000.00 33,900.00 113,000.00 1,276,900.00 1,276,900.00
RANGKA BAJA RINGAN
Kap 0,65 mm Btg 102,800.00 - - 102,800.00 - 102,800.00 3,084.00 10,280.00 116,164.00 116,100.00
Kap 0,75 mm Btg 135,100.00 - - 135,100.00 - 135,100.00 4,053.00 13,510.00 152,663.00 152,600.00
Reng 32 (kecil) Btg 54,200.00 - - 54,200.00 - 54,200.00 1,626.00 5,420.00 61,246.00 61,200.00
Reng 34 (besar) Btg 59,600.00 - - 59,600.00 - 59,600.00 1,788.00 5,960.00 67,348.00 67,300.00
Sekrup Reng Btg 1,800.00 - - 1,800.00 - 1,800.00 54.00 180.00 2,034.00 2,000.00
Sekrup Baja Btg 2,400.00 - - 2,400.00 - 2,400.00 72.00 240.00 2,712.00 2,700.00
SEMESTER : II, TAHUN ANGGARAN 2016
KECAMATAN TELUK AMBON BAGUALA (Triwulan II, Tahun 2017)
Galian C
MOS Price Overhead Jumlah PPN Total Pembulatan
Ongkos IMB
NO. URAIAN Unit Basic Price 15%
Angkut 20% x (4) x 7+8 3% x (9) 10%
4+5+6 x (7)
bj 10% x 9 9+10+11 "12" dibulatkan
Pemasangan Rangka Atap Lengkap m2 313,300.00 - - 313,300.00 - 313,300.00 9,399.00 31,330.00 354,029.00 354,000.00
14 BAHAN KAWAT
Kawat beton (bendrat) kg 18,500.00 - - 18,500.00 - 18,500.00 555.00 1,850.00 20,905.00 20,900.00
Nyamuk plastik (kasa) M2 9,400.00 - - 9,400.00 - 9,400.00 282.00 940.00 10,622.00 10,600.00
Nyamuk kawat (besi) M2 19,100.00 - - 19,100.00 - 19,100.00 573.00 1,910.00 21,583.00 21,500.00
Harmonika jos M2 32,500.00 - - 32,500.00 - 32,500.00 975.00 3,250.00 36,725.00 36,700.00
Saringan pasir (ayakan) M2 20,600.00 - - 20,600.00 - 20,600.00 618.00 2,060.00 23,278.00 23,200.00
Kawat duri (35 m') rol 81,100.00 - - 81,100.00 - 81,100.00 2,433.00 8,110.00 91,643.00 91,600.00
Kawat bronjong 4 mm (uk. 1m x 2m x 0,5m') bh 350,000.00 5,000.00 - 355,000.00 - 355,000.00 10,650.00 35,500.00 401,150.00 401,100.00
SEMESTER : II, TAHUN ANGGARAN 2016
KECAMATAN TELUK AMBON BAGUALA (Triwulan II, Tahun 2017)
Galian C
MOS Price Overhead Jumlah PPN Total Pembulatan
Ongkos IMB
NO. URAIAN Unit Basic Price 15%
Angkut 20% x (4) x 7+8 3% x (9) 10%
4+5+6 x (7)
bj 10% x 9 9+10+11 "12" dibulatkan
Kawat bronjong 3 mm (uk. 1m x 2m x 0,5m') bh 325,000.00 5,000.00 - 330,000.00 - 330,000.00 9,900.00 33,000.00 372,900.00 372,900.00
Kawat angin / ram M' 27,100.00 - - 27,100.00 - 27,100.00 813.00 2,710.00 30,623.00 30,600.00
Kawat las kg 34,580.00 - - 34,580.00 - 34,580.00 1,037.40 3,458.00 39,075.40 39,000.00
Kawat putih (rol kecil) rol 518,500.00 - - 518,500.00 - 518,500.00 15,555.00 51,850.00 585,905.00 585,900.00
Kawat putih (rol besar) rol 702,100.00 - - 702,100.00 - 702,100.00 21,063.00 70,210.00 793,373.00 793,300.00
Kawat ayakan M2 22,500.00 - - 22,500.00 - 22,500.00 675.00 2,250.00 25,425.00 25,400.00
15 BAHAN LANGIT-LANGIT
Tripleks 3 mm uk. 120 x 240 cm lbr 64,900.00 - - 64,900.00 - 64,900.00 1,947.00 6,490.00 73,337.00 73,300.00
Tripleks 4 mm uk. 120 x 240 cm lbr 78,500.00 - - 78,500.00 - 78,500.00 2,355.00 7,850.00 88,705.00 88,700.00
Tripleks 6 mm uk. 120 x 240 cm lbr 86,500.00 - - 86,500.00 - 86,500.00 2,595.00 8,650.00 97,745.00 97,700.00
Tripleks 9 mm uk. 120 x 240 cm lbr 172,900.00 - - 172,900.00 - 172,900.00 5,187.00 17,290.00 195,377.00 195,300.00
Tripleks 12 mm uk. 120 x 240 cm lbr 216,100.00 - - 216,100.00 - 216,100.00 6,483.00 21,610.00 244,193.00 244,100.00
Tripleks 15 mm uk. 120 x 240 cm lbr 270,100.00 - - 270,100.00 - 270,100.00 8,103.00 27,010.00 305,213.00 305,200.00
Tripleks 18 mm uk. 120 x 240 cm lbr 275,600.00 - - 275,600.00 - 275,600.00 8,268.00 27,560.00 311,428.00 311,400.00
Multipleks 10 mm lbr 143,300.00 - - 143,300.00 - 143,300.00 4,299.00 14,330.00 161,929.00 161,900.00
Multipleks 12 mm lbr 172,900.00 - - 172,900.00 - 172,900.00 5,187.00 17,290.00 195,377.00 195,300.00
Plywood 3 mm uk. 120 x 240 cm lbr 120,100.00 - - 120,100.00 - 120,100.00 3,603.00 12,010.00 135,713.00 135,700.00
Plywood 9 mm uk. 120 x 240 cm lbr 164,300.00 - - 164,300.00 - 164,300.00 4,929.00 16,430.00 185,659.00 185,600.00
Teakwood 120 x 240 mm (3 mm) 3 x 7 lbr 73,000.00 - - 73,000.00 - 73,000.00 2,190.00 7,300.00 82,490.00 82,400.00
Teakwood 120 x 240 mm (3 mm) 4 x 8 lbr 78,500.00 - - 78,500.00 - 78,500.00 2,355.00 7,850.00 88,705.00 88,700.00
Formika polos 4 x 8 lbr 83,400.00 - - 83,400.00 - 83,400.00 2,502.00 8,340.00 94,242.00 94,200.00
Formika polos 3 x 6 lbr 222,100.00 - - 222,100.00 - 222,100.00 6,663.00 22,210.00 250,973.00 250,900.00
Formika warna 4 x 8 lbr 222,100.00 - - 222,100.00 - 222,100.00 6,663.00 22,210.00 250,973.00 250,900.00
Formika warna 3 x 6 lbr 115,200.00 - - 115,200.00 - 115,200.00 3,456.00 11,520.00 130,176.00 130,100.00
Gypsum jaya board 9 mm, (120 x 240 cm) lbr 75,700.00 - - 75,700.00 - 75,700.00 2,271.00 7,570.00 85,541.00 85,500.00
Gypsum elephan board 9 mm, (120 x 240 cm) lbr 75,700.00 - - 75,700.00 - 75,700.00 2,271.00 7,570.00 85,541.00 85,500.00
Exaboard 6 mm uk. 120 x 240 cm lbr 72,000.00 - - 72,000.00 - 72,000.00 2,160.00 7,200.00 81,360.00 81,300.00
Kalsiboard 6 mm uk. 120 x 240 cm lbr 72,000.00 - - 72,000.00 - 72,000.00 2,160.00 7,200.00 81,360.00 81,300.00
Papan kayu (lambersering) lbr 33,200.00 - - 33,200.00 - 33,200.00 996.00 3,320.00 37,516.00 37,500.00
List plafond kayu profil (3cm / 4 M') lbr 21,700.00 - - 21,700.00 - 21,700.00 651.00 2,170.00 24,521.00 24,500.00
List plafond kayu profil (4cm / 4 M') lbr 21,700.00 - - 21,700.00 - 21,700.00 651.00 2,170.00 24,521.00 24,500.00
List plafond kayu profil (5cm / 4 M') lbr 33,700.00 - - 33,700.00 - 33,700.00 1,011.00 3,370.00 38,081.00 38,000.00
List plafond kayu profil (6cm / 4 M') lbr 33,700.00 - - 33,700.00 - 33,700.00 1,011.00 3,370.00 38,081.00 38,000.00
List plafond kayu (1 cm x 3 cm /4 M') lbr 19,500.00 - - 19,500.00 - 19,500.00 585.00 1,950.00 22,035.00 22,000.00
List plafond kayu (1 cm x 4 cm /4 M') lbr 19,500.00 - - 19,500.00 - 19,500.00 585.00 1,950.00 22,035.00 22,000.00
List Gypsum motif piano (7/10 cm) lbr 32,500.00 - - 32,500.00 - 32,500.00 975.00 3,250.00 36,725.00 36,700.00
List Gypsum motif biji beton (7/7 cm) lbr 19,500.00 - - 19,500.00 - 19,500.00 585.00 1,950.00 22,035.00 22,000.00
List Gypsum motif kipas (13/15 cm) lbr 32,500.00 - - 32,500.00 - 32,500.00 975.00 3,250.00 36,725.00 36,700.00
List Gypsum motif kangkung (7/10 cm) lbr 21,700.00 - - 21,700.00 - 21,700.00 651.00 2,170.00 24,521.00 24,500.00
List Gypsum motif kumis kucing (7/10 cm) lbr 21,700.00 - - 21,700.00 - 21,700.00 651.00 2,170.00 24,521.00 24,500.00
List profil Pvc K-1 (panjang 2 meter) lbr 28,200.00 - - 28,200.00 - 28,200.00 846.00 2,820.00 31,866.00 31,800.00
List profil Pvc K-2 (panjang 2 meter) lbr 21,700.00 - - 21,700.00 - 21,700.00 651.00 2,170.00 24,521.00 24,500.00
SEMESTER : II, TAHUN ANGGARAN 2016
KECAMATAN TELUK AMBON BAGUALA (Triwulan II, Tahun 2017)
Galian C
MOS Price Overhead Jumlah PPN Total Pembulatan
Ongkos IMB
NO. URAIAN Unit Basic Price 15%
Angkut 20% x (4) x 7+8 3% x (9) 10%
4+5+6 x (7)
bj 10% x 9 9+10+11 "12" dibulatkan
List profil Pvc K-3 (panjang 2 meter) lbr 21,700.00 - - 21,700.00 - 21,700.00 651.00 2,170.00 24,521.00 24,500.00
List profil Pvc K-4 (panjang 2 meter) lbr 21,700.00 - - 21,700.00 - 21,700.00 651.00 2,170.00 24,521.00 24,500.00
List profil Pvc K-5 (panjang 2 meter) lbr 21,700.00 - - 21,700.00 - 21,700.00 651.00 2,170.00 24,521.00 24,500.00
GRC board 4 mm uk. 120 x 240 cm lbr 62,920.00 - - 62,920.00 - 62,920.00 1,887.60 6,292.00 71,099.60 71,000.00
GRC board 6 mm uk. 120 x 240 cm lbr 112,530.00 - - 112,530.00 - 112,530.00 3,375.90 11,253.00 127,158.90 127,100.00
GRC board 9 mm uk. 120 x 240 cm lbr 154,880.00 - - 154,880.00 - 154,880.00 4,646.40 15,488.00 175,014.40 175,000.00
Taco HPL uk. 120 x 240 cm lbr 262,900.00 - - 262,900.00 - 262,900.00 7,887.00 26,290.00 297,077.00 297,000.00
Wallpaper motif stdr (uk. 0,50 x 10 m) rol 223,125.00 - - 223,125.00 - 223,125.00 6,693.75 22,312.50 252,131.25 252,100.00
Wallpaper motif khusus (uk. 1,06 x 15,60 m) rol 330,750.00 - - 330,750.00 - 330,750.00 9,922.50 33,075.00 373,747.50 373,700.00
16 BAHAN KACA
Colour tebal 3 mm m2 164,300.00 - - 164,300.00 - 164,300.00 4,929.00 16,430.00 185,659.00 185,600.00
Colour tebal 5 mm m2 205,300.00 - - 205,300.00 - 205,300.00 6,159.00 20,530.00 231,989.00 231,900.00
Polos tebal 3 mm (uk. 122 x 152 cm) m2 140,500.00 - - 140,500.00 - 140,500.00 4,215.00 14,050.00 158,765.00 158,700.00
Polos tebal 5 mm (uk. 122 x 152 cm) m2 194,500.00 - - 194,500.00 - 194,500.00 5,835.00 19,450.00 219,785.00 219,700.00
Polos tebal 8 mm m2 189,100.00 - - 189,100.00 - 189,100.00 5,673.00 18,910.00 213,683.00 213,600.00
Polos tebal 10 mm m2 218,500.00 - - 218,500.00 - 218,500.00 6,555.00 21,850.00 246,905.00 246,900.00
Polos tebal 12 mm m2 285,000.00 - - 285,000.00 - 285,000.00 8,550.00 28,500.00 322,050.00 322,000.00
Es / kembang tebal 3 mm m2 230,000.00 - - 230,000.00 - 230,000.00 6,900.00 23,000.00 259,900.00 259,900.00
Es / kembang tebal 5 mm m2 285,000.00 - - 285,000.00 - 285,000.00 8,550.00 28,500.00 322,050.00 322,000.00
Buram tebal 3 mm m2 151,300.00 - - 151,300.00 - 151,300.00 4,539.00 15,130.00 170,969.00 170,900.00
Buram tebal 5 mm m2 164,300.00 - - 164,300.00 - 164,300.00 4,929.00 16,430.00 185,659.00 185,600.00
Rayband tebal 3 mm (uk. 122 x 152 cm) m2 237,600.00 - - 237,600.00 - 237,600.00 7,128.00 23,760.00 268,488.00 268,400.00
Rayband tebal 5 mm (uk. 122 x 152 cm) m2 189,100.00 - - 189,100.00 - 189,100.00 5,673.00 18,910.00 213,683.00 213,600.00
Clear tempered tebal 5 mm m2 227,000.00 - - 227,000.00 - 227,000.00 6,810.00 22,700.00 256,510.00 256,500.00
Clear tempered tebal 6 mm m2 289,600.00 - - 289,600.00 - 289,600.00 8,688.00 28,960.00 327,248.00 327,200.00
Clear tempered tebal 8 mm m2 417,600.00 - - 417,600.00 - 417,600.00 12,528.00 41,760.00 471,888.00 471,800.00
Clear tempered tebal 10 mm m2 492,000.00 - - 492,000.00 - 492,000.00 14,760.00 49,200.00 555,960.00 555,900.00
Clear tempered tebal 12 mm m2 552,000.00 - - 552,000.00 - 552,000.00 16,560.00 55,200.00 623,760.00 623,700.00
Jendela nako 4 mata 5 mm set 81,100.00 - - 81,100.00 - 81,100.00 2,433.00 8,110.00 91,643.00 91,600.00
Jendela nako 5 mata 5 mm set 86,500.00 - - 86,500.00 - 86,500.00 2,595.00 8,650.00 97,745.00 97,700.00
Jendela nako 4 mata 6 mm set 91,900.00 - - 91,900.00 - 91,900.00 2,757.00 9,190.00 103,847.00 103,800.00
Jendela nako 4 mata 7 mm set 91,900.00 - - 91,900.00 - 91,900.00 2,757.00 9,190.00 103,847.00 103,800.00
Rangka nako 7 mata bh 75,700.00 - - 75,700.00 - 75,700.00 2,271.00 7,570.00 85,541.00 85,500.00
Rangka nako 5 mata bh 54,200.00 - - 54,200.00 - 54,200.00 1,626.00 5,420.00 61,246.00 61,200.00
Sticker Sandblast (buram es) m2 69,000.00 - - 69,000.00 - 69,000.00 2,070.00 6,900.00 77,970.00 77,900.00
Sticker Sandblast (biasa) m2 34,500.00 - - 34,500.00 - 34,500.00 1,035.00 3,450.00 38,985.00 38,900.00
17 BAHAN LISTRIK
Kabel Eterna NYM 2 x 1,5 mm m' 6,100.00 - - 6,100.00 - 6,100.00 183.00 610.00 6,893.00 6,800.00
Kabel Eterna NYM 3 x 1,5 mm m' 8,800.00 - - 8,800.00 - 8,800.00 264.00 880.00 9,944.00 9,900.00
Kabel Eterna NYM 2 x 2.5 mm m' 8,800.00 - - 8,800.00 - 8,800.00 264.00 880.00 9,944.00 9,900.00
Kabel Eterna NYM 3 x 2.5 mm m' 10,900.00 - - 10,900.00 - 10,900.00 327.00 1,090.00 12,317.00 12,300.00
SEMESTER : II, TAHUN ANGGARAN 2016
KECAMATAN TELUK AMBON BAGUALA (Triwulan II, Tahun 2017)
Galian C
MOS Price Overhead Jumlah PPN Total Pembulatan
Ongkos IMB
NO. URAIAN Unit Basic Price 15%
Angkut 20% x (4) x 7+8 3% x (9) 10%
4+5+6 x (7)
bj 10% x 9 9+10+11 "12" dibulatkan
Kabel Eterna NYM 4 x 2.5 mm m' 14,700.00 - - 14,700.00 - 14,700.00 441.00 1,470.00 16,611.00 16,600.00
Kabel NYY 2 x 1.5 mm m' 9,400.00 - - 9,400.00 - 9,400.00 282.00 940.00 10,622.00 10,600.00
Kabel NYY 2 x 2.5 mm m' 12,600.00 - - 12,600.00 - 12,600.00 378.00 1,260.00 14,238.00 14,200.00
Kabel NYY 3 x 1.5 mm m' 11,500.00 - - 11,500.00 - 11,500.00 345.00 1,150.00 12,995.00 12,900.00
Kabel NYY 3 x 2.5 mm m' 15,800.00 - - 15,800.00 - 15,800.00 474.00 1,580.00 17,854.00 17,800.00
Kabel NYY 4 x 2.5 mm m' 18,500.00 - - 18,500.00 - 18,500.00 555.00 1,850.00 20,905.00 20,900.00
Kabel Feeder NFGBY 4 x 6 mm m' 71,400.00 - - 71,400.00 - 71,400.00 2,142.00 7,140.00 80,682.00 80,600.00
Kabel NGA uk. 1,5 mm m' 2,400.00 - - 2,400.00 - 2,400.00 72.00 240.00 2,712.00 2,700.00
Kabel NGA uk. 2,5 mm m' 3,300.00 - - 3,300.00 - 3,300.00 99.00 330.00 3,729.00 3,700.00
Sekering 1 phase bh 54,200.00 - 54,200.00 - 54,200.00 1,626.00 5,420.00 61,246.00 61,200.00
Sekering 2 phase bh 77,500.00 - 77,500.00 - 77,500.00 2,325.00 7,750.00 87,575.00 87,500.00
Sekring Batu bh 5,300.00 - 5,300.00 - 5,300.00 159.00 530.00 5,989.00 5,900.00
Fuse Box Broco bh 38,000.00 - 38,000.00 - 38,000.00 1,140.00 3,800.00 42,940.00 42,900.00
Kap Sekring bh 6,500.00 - 6,500.00 - 6,500.00 195.00 650.00 7,345.00 7,300.00
Steker gepeng broco bh 3,300.00 - 3,300.00 - 3,300.00 99.00 330.00 3,729.00 3,700.00
Steker AC panasonic bh 21,700.00 - 21,700.00 - 21,700.00 651.00 2,170.00 24,521.00 24,500.00
Steker AC arde broco bh 21,700.00 - 21,700.00 - 21,700.00 651.00 2,170.00 24,521.00 24,500.00
Steker bestram steker arde bh 9,400.00 - 9,400.00 - 9,400.00 282.00 940.00 10,622.00 10,600.00
Bestram over steker bh 19,100.00 - 19,100.00 - 19,100.00 573.00 1,910.00 21,583.00 21,500.00
TE arde yosida bh 21,700.00 - 21,700.00 - 21,700.00 651.00 2,170.00 24,521.00 24,500.00
TE gepeng broco bh 6,600.00 - 6,600.00 - 6,600.00 198.00 660.00 7,458.00 7,400.00
TE serbaguna loyal bh 21,700.00 - 21,700.00 - 21,700.00 651.00 2,170.00 24,521.00 24,500.00
Viting tempel merk broco bh 9,400.00 - 9,400.00 - 9,400.00 282.00 940.00 10,622.00 10,600.00
Viting tempel Dexta bh 6,600.00 - 6,600.00 - 6,600.00 198.00 660.00 7,458.00 7,400.00
Fitting Plafond Broco bh 28,800.00 - 28,800.00 - 28,800.00 864.00 2,880.00 32,544.00 32,500.00
Fitting Segi New Broco bh 9,400.00 - 9,400.00 - 9,400.00 282.00 940.00 10,622.00 10,600.00
Lampu neon (komplit) TL 10 watt bh 52,000.00 - - 52,000.00 - 52,000.00 1,560.00 5,200.00 58,760.00 58,700.00
Lampu neon (komplit) TL 20 watt bh 106,000.00 - - 106,000.00 - 106,000.00 3,180.00 10,600.00 119,780.00 119,700.00
Lampu neon (komplit) TL 40 watt bh 129,700.00 - - 129,700.00 - 129,700.00 3,891.00 12,970.00 146,561.00 146,500.00
Lampu Down light 14 watt bh 135,000.00 - - 135,000.00 - 135,000.00 4,050.00 13,500.00 152,550.00 152,500.00
Lampu Down light 11 watt bh 115,000.00 - - 115,000.00 - 115,000.00 3,450.00 11,500.00 129,950.00 129,900.00
Lampu pijar 15 watt + vitting bh 7,200.00 - - 7,200.00 - 7,200.00 216.00 720.00 8,136.00 8,100.00
Lampu pijar 60 watt bh 8,800.00 - - 8,800.00 - 8,800.00 264.00 880.00 9,944.00 9,900.00
Lampu pijar 75 watt bh 9,400.00 - - 9,400.00 - 9,400.00 282.00 940.00 10,622.00 10,600.00
TL bulat 10 watt (komplit) bh 29,000.00 - - 29,000.00 - 29,000.00 870.00 2,900.00 32,770.00 32,700.00
TL bulat 20 watt (komplit) bh 60,000.00 - - 60,000.00 - 60,000.00 1,800.00 6,000.00 67,800.00 67,800.00
Lampu Philips 11 watt bh 29,900.00 - - 29,900.00 - 29,900.00 897.00 2,990.00 33,787.00 33,700.00
Lampu Philips 18 watt bh 36,200.00 - - 36,200.00 - 36,200.00 1,086.00 3,620.00 40,906.00 40,900.00
Lampu Philips 23 watt bh 44,400.00 - - 44,400.00 - 44,400.00 1,332.00 4,440.00 50,172.00 50,100.00
Stop Kontak bh 12,000.00 - 12,000.00 - 12,000.00 360.00 1,200.00 13,560.00 13,500.00
Saklar Ganda bh 14,700.00 - 14,700.00 - 14,700.00 441.00 1,470.00 16,611.00 16,600.00
Saklar Tunggal bh 10,900.00 - 10,900.00 - 10,900.00 327.00 1,090.00 12,317.00 12,300.00
Stop Kontak AC bh 71,400.00 - 71,400.00 - 71,400.00 2,142.00 7,140.00 80,682.00 80,600.00
SEMESTER : II, TAHUN ANGGARAN 2016
KECAMATAN TELUK AMBON BAGUALA (Triwulan II, Tahun 2017)
Galian C
MOS Price Overhead Jumlah PPN Total Pembulatan
Ongkos IMB
NO. URAIAN Unit Basic Price 15%
Angkut 20% x (4) x 7+8 3% x (9) 10%
4+5+6 x (7)
bj 10% x 9 9+10+11 "12" dibulatkan
Titik lampu ttk 350,000.00 - - 350,000.00 - 350,000.00 10,500.00 35,000.00 395,500.00 395,500.00
MCB 4 ampere powell (asli) bh 38,500.00 - - 38,500.00 - 38,500.00 1,155.00 3,850.00 43,505.00 43,500.00
MCB 6 ampere powell (asli) bh 52,000.00 - - 52,000.00 - 52,000.00 1,560.00 5,200.00 58,760.00 58,700.00
MCB 10 ampere powell (asli) bh 52,000.00 - - 52,000.00 - 52,000.00 1,560.00 5,200.00 58,760.00 58,700.00
MCB 16 ampere powell (asli) bh 52,000.00 - - 52,000.00 - 52,000.00 1,560.00 5,200.00 58,760.00 58,700.00
Box MCB 1 unit (biasa) bh 10,000.00 - - 10,000.00 - 10,000.00 300.00 1,000.00 11,300.00 11,300.00
Box MCB 2 unit (masako) bh 20,000.00 - - 20,000.00 - 20,000.00 600.00 2,000.00 22,600.00 22,600.00
Box MCB 4 unit (masako) bh 38,000.00 - - 38,000.00 - 38,000.00 1,140.00 3,800.00 42,940.00 42,900.00
Box MCB 6 unit (masako) bh 58,000.00 - - 58,000.00 - 58,000.00 1,740.00 5,800.00 65,540.00 65,500.00
Pipa Conduit / Pipa Listrik M' 3,750.00 - - 3,750.00 - 3,750.00 112.50 375.00 4,237.50 4,200.00
Tee dos bh 5,500.00 - - 5,500.00 - 5,500.00 165.00 550.00 6,215.00 6,200.00
Jack A bh 13,700.00 - - 13,700.00 - 13,700.00 411.00 1,370.00 15,481.00 15,400.00
Selotif dos 13,100.00 - - 13,100.00 - 13,100.00 393.00 1,310.00 14,803.00 14,800.00
Round Cable clip size : 8 mm dos 12,000.00 - - 12,000.00 - 12,000.00 360.00 1,200.00 13,560.00 13,500.00
Round Cable clip size : 9 mm dos 15,000.00 - - 15,000.00 - 15,000.00 450.00 1,500.00 16,950.00 16,900.00
Round Cable clip size : 10 mm dos 17,500.00 - - 17,500.00 - 17,500.00 525.00 1,750.00 19,775.00 19,700.00
Lampu Taman + perlengkapan bh 375,000.00 - - 375,000.00 - 375,000.00 11,250.00 37,500.00 423,750.00 423,700.00
Kap lampu plafond gypsum 5" (philips) bh 80,000.00 - - 80,000.00 - 80,000.00 2,400.00 8,000.00 90,400.00 90,400.00
Kap lampu plafond gypsum 4" (philips) bh 70,000.00 - - 70,000.00 - 70,000.00 2,100.00 7,000.00 79,100.00 79,100.00
Exhause fan plafond (KM/Toilet/Lavatory) Unit 460,000.00 - - 460,000.00 - 460,000.00 13,800.00 46,000.00 519,800.00 519,800.00
Wall Fan [Kipas Angin Dinding] Unit 410,000.00 - - 410,000.00 - 410,000.00 12,300.00 41,000.00 463,300.00 463,300.00
Pemadam Api Yamato 3 kg bh 862,500.00 - - 862,500.00 - 862,500.00 25,875.00 86,250.00 974,625.00 974,600.00
Pemadam Api Yamato 4,5 kg bh 1,288,000.00 - - 1,288,000.00 - 1,288,000.00 38,640.00 128,800.00 1,455,440.00 1,455,400.00
Pemadam Api Yamato 6 kg bh 1,667,500.00 - - 1,667,500.00 - 1,667,500.00 50,025.00 166,750.00 1,884,275.00 1,884,200.00
Pemadam Api Yamato 9 kg bh 2,012,500.00 - - 2,012,500.00 - 2,012,500.00 60,375.00 201,250.00 2,274,125.00 2,274,100.00
AC 5PK Floor Standind (merk ; Polytron) bh 17,543,550.00 - - 17,543,550.00 - 17,543,550.00 526,306.50 1,754,355.00 19,824,211.50 19,824,200.00
AC 3PK Floor Standind (merk ; Polytron) bh 11,803,000.00 - - 11,803,000.00 - 11,803,000.00 354,090.00 1,180,300.00 13,337,390.00 13,337,300.00
AC 2PK Floor Standind (merk ; Polytron) bh 9,388,750.00 - - 9,388,750.00 - 9,388,750.00 281,662.50 938,875.00 10,609,287.50 10,609,200.00
AC 5PK Floor Standind (merk ; Panasonic) bh 26,717,700.00 - - 26,717,700.00 - 26,717,700.00 801,531.00 2,671,770.00 30,191,001.00 30,191,000.00
AC 3PK Floor Standind (merk ; Panasonic) bh 19,153,050.00 - - 19,153,050.00 - 19,153,050.00 574,591.50 1,915,305.00 21,642,946.50 21,642,900.00
AC 3PK Floor Standind (merk ; Panasonic) bh 12,876,000.00 - - 12,876,000.00 - 12,876,000.00 386,280.00 1,287,600.00 14,549,880.00 14,549,800.00
AC 2PK Split (merk ; LG) bh 7,528,500.00 - - 7,528,500.00 - 7,528,500.00 225,855.00 752,850.00 8,507,205.00 8,507,200.00
AC 1,5PK Split (merk ; LG) bh 5,473,100.00 - - 5,473,100.00 - 5,473,100.00 164,193.00 547,310.00 6,184,603.00 6,184,600.00
AC 1PK Split (merk ; LG) bh 4,290,050.00 - - 4,290,050.00 - 4,290,050.00 128,701.50 429,005.00 4,847,756.50 4,847,700.00
AC 0,5PK Split (merk ; LG) bh 4,057,025.00 - - 4,057,025.00 - 4,057,025.00 121,710.75 405,702.50 4,584,438.25 4,584,400.00
AC 2PK Split (merk ; Panasonic) bh 7,211,800.00 - - 7,211,800.00 - 7,211,800.00 216,354.00 721,180.00 8,149,334.00 8,149,300.00
AC 1,5PK Split (merk ; Panasonic) bh 5,499,800.00 - - 5,499,800.00 - 5,499,800.00 164,994.00 549,980.00 6,214,774.00 6,214,700.00
AC 1PK Split (merk ; Panasonic) bh 4,205,100.00 - - 4,205,100.00 - 4,205,100.00 126,153.00 420,510.00 4,751,763.00 4,751,700.00
AC 0,5PK Split (merk ; Panasonic) bh 3,991,100.00 - - 3,991,100.00 - 3,991,100.00 119,733.00 399,110.00 4,509,943.00 4,509,900.00
AC 2PK Split (merk ; Polytron) bh 5,244,305.00 - - 5,244,305.00 - 5,244,305.00 157,329.15 524,430.50 5,926,064.65 5,926,000.00
AC 1,5PK Split (merk ; Polytron) bh 4,050,000.00 - - 4,050,000.00 - 4,050,000.00 121,500.00 405,000.00 4,576,500.00 4,576,500.00
AC 1PK Split (merk ; Polytron) bh 3,294,000.00 - - 3,294,000.00 - 3,294,000.00 98,820.00 329,400.00 3,722,220.00 3,722,200.00
AC 0,5PK Split (merk ; Polytron) bh 2,862,000.00 - - 2,862,000.00 - 2,862,000.00 85,860.00 286,200.00 3,234,060.00 3,234,000.00
SEMESTER : II, TAHUN ANGGARAN 2016
KECAMATAN TELUK AMBON BAGUALA (Triwulan II, Tahun 2017)
Galian C
MOS Price Overhead Jumlah PPN Total Pembulatan
Ongkos IMB
NO. URAIAN Unit Basic Price 15%
Angkut 20% x (4) x 7+8 3% x (9) 10%
4+5+6 x (7)
bj 10% x 9 9+10+11 "12" dibulatkan
AC 5PK Floor Standind (merk ; Sharp) bh 22,126,500.00 - - 22,126,500.00 - 22,126,500.00 663,795.00 2,212,650.00 25,002,945.00 25,002,900.00
Sound System Indoor (Lux ; Yamaha+Auderpro) Unit 233,350,000.00 - - 233,350,000.00 15,167,750.00 248,517,750.00 7,455,532.50 24,851,775.00 280,825,057.50 280,825,000.00
Sound System Indoor (Premium ; Yamaha+Auderpro) Unit 128,500,000.00 - - 128,500,000.00 8,352,500.00 136,852,500.00 4,105,575.00 13,685,250.00 154,643,325.00 154,643,300.00
Sound System Indoor (merk ; HK Audio) Unit 427,258,000.00 - - 427,258,000.00 27,771,770.00 455,029,770.00 13,650,893.10 45,502,977.00 514,183,640.10 514,183,600.00
Sound System Indoor (merk ; ARRAY Audiocenter) Unit 435,648,000.00 - - 435,648,000.00 29,841,888.00 465,489,888.00 13,964,696.64 46,548,988.80 526,003,573.44 526,003,500.00
19 BAHAN SANITAIR
Kloset jongkok lokal (merk continental) bh 110,000.00 - - 110,000.00 - 110,000.00 3,300.00 11,000.00 124,300.00 124,300.00
Kloset jongkok (INA/sejenis) bh 380,000.00 - - 380,000.00 - 380,000.00 11,400.00 38,000.00 429,400.00 429,400.00
Kloset jongkok (american standart) bh 380,000.00 - - 380,000.00 - 380,000.00 11,400.00 38,000.00 429,400.00 429,400.00
Kloset duduk toto (tanpa tabung) unit 756,100.00 - - 756,100.00 - 756,100.00 22,683.00 75,610.00 854,393.00 854,300.00
Kloset duduk toto (pakai tabung) unit 2,484,000.00 - - 2,484,000.00 - 2,484,000.00 74,520.00 248,400.00 2,806,920.00 2,806,900.00
Kloset duduk american standart (pakai tabung) unit 2,322,000.00 - - 2,322,000.00 - 2,322,000.00 69,660.00 232,200.00 2,623,860.00 2,623,800.00
Kloset duduk lengkap (merk INA) unit 930,000.00 - - 930,000.00 - 930,000.00 27,900.00 93,000.00 1,050,900.00 1,050,900.00
Kloset duduk PARMA (pakai tabung) unit 1,080,000.00 - - 1,080,000.00 - 1,080,000.00 32,400.00 108,000.00 1,220,400.00 1,220,400.00
Kloset duduk toto (CV660PJ/SW660J) unit 2,700,000.00 - - 2,700,000.00 - 2,700,000.00 81,000.00 270,000.00 3,051,000.00 3,051,000.00
Kloset duduk toto (CV668J/SW668J) unit 3,456,000.00 - - 3,456,000.00 - 3,456,000.00 103,680.00 345,600.00 3,905,280.00 3,905,200.00
Wastafel (amerikan Standart) bh 405,200.00 - - 405,200.00 - 405,200.00 12,156.00 40,520.00 457,876.00 457,800.00
Wastafel (warna/keramik) bh 405,200.00 - - 405,200.00 - 405,200.00 12,156.00 40,520.00 457,876.00 457,800.00
Wastafel (warna/keramik) setara KW.1 bh 1,620,000.00 - - 1,620,000.00 - 1,620,000.00 48,600.00 162,000.00 1,830,600.00 1,830,600.00
Tempat cuci 1 lubang bh 302,000.00 - - 302,000.00 - 302,000.00 9,060.00 30,200.00 341,260.00 341,200.00
Tempat cuci 2 lubang bh 540,000.00 - - 540,000.00 - 540,000.00 16,200.00 54,000.00 610,200.00 610,200.00
Urinoir lokal putih bh 918,000.00 - - 918,000.00 - 918,000.00 27,540.00 91,800.00 1,037,340.00 1,037,300.00
Urinoir keramik bh 1,890,000.00 - - 1,890,000.00 - 1,890,000.00 56,700.00 189,000.00 2,135,700.00 2,135,700.00
Shower kls A unit 405,000.00 - - 405,000.00 - 405,000.00 12,150.00 40,500.00 457,650.00 457,600.00
Shower kls B unit 243,200.00 - - 243,200.00 - 243,200.00 7,296.00 24,320.00 274,816.00 274,800.00
Shower klosed unit 210,100.00 - - 210,100.00 - 210,100.00 6,303.00 21,010.00 237,413.00 237,400.00
Saringan air besi bh 98,000.00 - - 98,000.00 - 98,000.00 2,940.00 9,800.00 110,740.00 110,700.00
Saringan air plastik bh 54,200.00 - - 54,200.00 - 54,200.00 1,626.00 5,420.00 61,246.00 61,200.00
Kran Air 3/4" bh 23,000.00 - - 23,000.00 - 23,000.00 690.00 2,300.00 25,990.00 25,900.00
Kran Air 1/2" bh 16,500.00 - - 16,500.00 - 16,500.00 495.00 1,650.00 18,645.00 18,600.00
Tempat sabun tempel bh 54,200.00 - - 54,200.00 - 54,200.00 1,626.00 5,420.00 61,246.00 61,200.00
Soap Dispenser bh 108,100.00 - - 108,100.00 - 108,100.00 3,243.00 10,810.00 122,153.00 122,100.00
Pipa PVC/Pipa Plastik
Pipa PVC maspion AW dia. 1/2" x 4 m btg 33,000.00 - - 33,000.00 - 33,000.00 990.00 3,300.00 37,290.00 37,200.00
Pipa PVC maspion AW dia. 3/4" x 4 m btg 39,000.00 - - 39,000.00 - 39,000.00 1,170.00 3,900.00 44,070.00 44,000.00
Pipa PVC maspion AW dia. 1" x 4 m btg 50,000.00 - - 50,000.00 - 50,000.00 1,500.00 5,000.00 56,500.00 56,500.00
Pipa PVC maspion AW dia. 1 1/2" x 4 m btg 85,000.00 - - 85,000.00 - 85,000.00 2,550.00 8,500.00 96,050.00 96,000.00
Pipa PVC maspion AW dia. 2" x 4 m btg 132,000.00 - - 132,000.00 - 132,000.00 3,960.00 13,200.00 149,160.00 149,100.00
Pipa PVC maspion AW dia. 2 1/2" x 4 m btg 165,000.00 - - 165,000.00 - 165,000.00 4,950.00 16,500.00 186,450.00 186,400.00
Pipa PVC maspion AW dia. 3" x 4 m btg 225,000.00 - - 225,000.00 - 225,000.00 6,750.00 22,500.00 254,250.00 254,200.00
Pipa PVC maspion AW dia. 4" x 4 m btg 295,000.00 - - 295,000.00 - 295,000.00 8,850.00 29,500.00 333,350.00 333,300.00
Pipa PVC Wavin AW dia. 1/2" x 4 m btg 20,000.00 - - 20,000.00 - 20,000.00 600.00 2,000.00 22,600.00 22,600.00
Pipa PVC Wavin AW dia. 3/4" x 4 m btg 26,000.00 - - 26,000.00 - 26,000.00 780.00 2,600.00 29,380.00 29,300.00
SEMESTER : II, TAHUN ANGGARAN 2016
KECAMATAN TELUK AMBON BAGUALA (Triwulan II, Tahun 2017)
Galian C
MOS Price Overhead Jumlah PPN Total Pembulatan
Ongkos IMB
NO. URAIAN Unit Basic Price 15%
Angkut 20% x (4) x 7+8 3% x (9) 10%
4+5+6 x (7)
bj 10% x 9 9+10+11 "12" dibulatkan
Pipa PVC Wavin AW dia. 1" x 4 m btg 35,000.00 - - 35,000.00 - 35,000.00 1,050.00 3,500.00 39,550.00 39,500.00
Pipa PVC Wavin AW dia. 1 1/2" x 4 m btg 50,000.00 - - 50,000.00 - 50,000.00 1,500.00 5,000.00 56,500.00 56,500.00
Pipa PVC Wavin AW dia. 2" x 4 m btg 75,000.00 - - 75,000.00 - 75,000.00 2,250.00 7,500.00 84,750.00 84,700.00
Pipa PVC Wavin AW dia. 2 1/2" x 4 m btg 100,000.00 - - 100,000.00 - 100,000.00 3,000.00 10,000.00 113,000.00 113,000.00
Pipa PVC Wavin AW dia. 3" x 4 m btg 125,000.00 - - 125,000.00 - 125,000.00 3,750.00 12,500.00 141,250.00 141,200.00
Pipa PVC Wavin AW dia. 4" x 4 m btg 130,000.00 - - 130,000.00 - 130,000.00 3,900.00 13,000.00 146,900.00 146,900.00
Pipa PVC Wavin AW dia. 5" x 4 m btg 135,000.00 - - 135,000.00 - 135,000.00 4,050.00 13,500.00 152,550.00 152,500.00
Pipa PVC DV dia. 1/2" x 4 m m' 9,250.00 - - 9,250.00 - 9,250.00 277.50 925.00 10,452.50 10,400.00
Pipa PVC DV dia. 3/4" x 4 m m' 10,750.00 - - 10,750.00 - 10,750.00 322.50 1,075.00 12,147.50 12,100.00
Pipa PVC DV dia. 1" x 4 m m' 12,500.00 - - 12,500.00 - 12,500.00 375.00 1,250.00 14,125.00 14,100.00
Pipa PVC DV dia. 1 1/2" x 4 m m' 14,000.00 - - 14,000.00 - 14,000.00 420.00 1,400.00 15,820.00 15,800.00
Pipa PVC DV dia. 2" x 4 m m' 15,500.00 - - 15,500.00 - 15,500.00 465.00 1,550.00 17,515.00 17,500.00
Pipa PVC DV dia. 2 1/2" x 4 m m' 25,500.00 - - 25,500.00 - 25,500.00 765.00 2,550.00 28,815.00 28,800.00
Pipa PVC DV dia. 3" x 4 m m' 35,600.00 - - 35,600.00 - 35,600.00 1,068.00 3,560.00 40,228.00 40,200.00
Pipa PVC DV dia. 4" x 4 m m' 45,800.00 - - 45,800.00 - 45,800.00 1,374.00 4,580.00 51,754.00 51,700.00
Pompa air sanyo 125 watt (otomatis) bh 625,000.00 - - 625,000.00 - 625,000.00 18,750.00 62,500.00 706,250.00 706,200.00
Pompa air sanyo PH.258 JP.50 HZ bh 5,900,000.00 - - 5,900,000.00 - 5,900,000.00 177,000.00 590,000.00 6,667,000.00 6,667,000.00
Pompa air sanyo PH.130 B bh 1,161,500.00 - - 1,161,500.00 - 1,161,500.00 34,845.00 116,150.00 1,312,495.00 1,312,400.00
Pompa air tangan dragon bh 452,000.00 - - 452,000.00 - 452,000.00 13,560.00 45,200.00 510,760.00 510,700.00
Jet washer Closed (setara San Ei) bh 110,000.00 - - 110,000.00 - 110,000.00 3,300.00 11,000.00 124,300.00 124,300.00
Kran air setara San Ei bh 155,300.00 - - 155,300.00 - 155,300.00 4,659.00 15,530.00 175,489.00 175,400.00
Kitchen zink satu mata terbuat dari stainless bh 1,056,500.00 - - 1,056,500.00 - 1,056,500.00 31,695.00 105,650.00 1,193,845.00 1,193,800.00
Floor drain bh 98,000.00 - - 98,000.00 - 98,000.00 2,940.00 9,800.00 110,740.00 110,700.00
Paper Holder Tissu (bahan aliminium) bh 223,300.00 - - 223,300.00 - 223,300.00 6,699.00 22,330.00 252,329.00 252,300.00
Pintu Kamar Mandi (66 x 182 cm) bh 250,000.00 - - 250,000.00 - 250,000.00 7,500.00 25,000.00 282,500.00 282,500.00
Kusen Kayu Pintu (siap pasang) bh 702,000.00 - - 702,000.00 - 702,000.00 21,060.00 70,200.00 793,260.00 793,200.00
Kusen Kayu Jendela (siap pasang) bh 702,000.00 - - 702,000.00 - 702,000.00 21,060.00 70,200.00 793,260.00 793,200.00
Daun Pintu Kayu (siap pasang) bh 1,365,000.00 - - 1,365,000.00 - 1,365,000.00 40,950.00 136,500.00 1,542,450.00 1,542,400.00
Pintu Harmonika (lebar 7 m') bh 19,000,000.00 - - 19,000,000.00 - 19,000,000.00 570,000.00 1,900,000.00 21,470,000.00 21,470,000.00
SEMESTER : II, TAHUN ANGGARAN 2016
KECAMATAN TELUK AMBON BAGUALA (Triwulan II, Tahun 2017)
Galian C
MOS Price Overhead Jumlah PPN Total Pembulatan
Ongkos IMB
NO. URAIAN Unit Basic Price 15%
Angkut 20% x (4) x 7+8 3% x (9) 10%
4+5+6 x (7)
bj 10% x 9 9+10+11 "12" dibulatkan
Pintu Harmonika (lebar 3 m') bh 10,920,000.00 - - 10,920,000.00 - 10,920,000.00 327,600.00 1,092,000.00 12,339,600.00 12,339,600.00
Folding Gate Besi 0,3 mm m2 333,000.00 - - 333,000.00 - 333,000.00 9,990.00 33,300.00 376,290.00 376,200.00
Folding Gate Besi 0,5 mm m2 409,000.00 - - 409,000.00 - 409,000.00 12,270.00 40,900.00 462,170.00 462,100.00
Folding Gate Besi 0,8 mm m2 603,000.00 - - 603,000.00 - 603,000.00 18,090.00 60,300.00 681,390.00 681,300.00
Rolling Door Besi (tbl. 0,45 mm) m2 257,000.00 - - 257,000.00 - 257,000.00 7,710.00 25,700.00 290,410.00 290,400.00
Rolling Door Galvalum (tbl. 0,45 mm) m2 290,000.00 - - 290,000.00 - 290,000.00 8,700.00 29,000.00 327,700.00 327,700.00
Rolling Door Alimunium (tbl. 0,45 mm) m2 355,000.00 - - 355,000.00 - 355,000.00 10,650.00 35,500.00 401,150.00 401,100.00
20 BAHAN JALAN
Aspal Pertamina (150 kg) drum 1,050,000.00 - - 1,050,000.00 - 1,050,000.00 31,500.00 105,000.00 1,186,500.00 1,186,500.00
Aspal dingin drum 1,353,600.00 - - 1,353,600.00 - 1,353,600.00 40,608.00 135,360.00 1,529,568.00 1,529,500.00
Aspal emulsi drum 1,558,700.00 - - 1,558,700.00 - 1,558,700.00 46,761.00 155,870.00 1,761,331.00 1,761,300.00
Agregat kasar m3 225,000.00 - - 225,000.00 - 225,000.00 6,750.00 22,500.00 254,250.00 254,200.00
Agregat halus m3 250,000.00 - - 250,000.00 - 250,000.00 7,500.00 25,000.00 282,500.00 282,500.00
Filler kg 2,000.00 - - 2,000.00 - 2,000.00 60.00 200.00 2,260.00 2,200.00
Gravel m3 225,000.00 - - 225,000.00 - 225,000.00 6,750.00 22,500.00 254,250.00 254,200.00
Minyak tanah ltr 3,500.00 - - 3,500.00 - 3,500.00 105.00 350.00 3,955.00 3,900.00
Bensin ltr 8,000.00 - - 8,000.00 - 8,000.00 240.00 800.00 9,040.00 9,000.00
Solar ltr 7,500.00 - - 7,500.00 - 7,500.00 225.00 750.00 8,475.00 8,400.00
Thiner ltr 29,000.00 - - 29,000.00 - 29,000.00 870.00 2,900.00 32,770.00 32,700.00
Minyak pelumas (oli) ltr 35,000.00 - - 35,000.00 - 35,000.00 1,050.00 3,500.00 39,550.00 39,500.00
Cat marka (non termoplas) kg 100,000.00 - - 100,000.00 - 100,000.00 3,000.00 10,000.00 113,000.00 113,000.00
Cat marka (termoplastic) kg 175,000.00 - - 175,000.00 - 175,000.00 5,250.00 17,500.00 197,750.00 197,700.00
Plastik filler m2 31,000.00 - - 31,000.00 - 31,000.00 930.00 3,100.00 35,030.00 35,000.00
Pipa galvanis Medium B dia. 2" btg 307,000.00 - - 307,000.00 - 307,000.00 9,210.00 30,700.00 346,910.00 346,900.00
Pipa porus dia. 4" m' 48,500.00 - - 48,500.00 - 48,500.00 1,455.00 4,850.00 54,805.00 54,800.00
Geotextile m2 35,000.00 - - 35,000.00 - 35,000.00 1,050.00 3,500.00 39,550.00 39,500.00
Bahan agregat base kkelas A m3 350,000.00 - - 350,000.00 - 350,000.00 10,500.00 35,000.00 395,500.00 395,500.00
Bahan agregat base kkelas B m3 325,000.00 - - 325,000.00 - 325,000.00 9,750.00 32,500.00 367,250.00 367,200.00
Bahan agregat base kkelas C m3 300,000.00 - - 300,000.00 - 300,000.00 9,000.00 30,000.00 339,000.00 339,000.00
Gebalan rumput m2 30,000.00 - - 30,000.00 - 30,000.00 900.00 3,000.00 33,900.00 33,900.00
Glass bead kg 85,000.00 - - 85,000.00 - 85,000.00 2,550.00 8,500.00 96,050.00 96,000.00
Pelat rambu (eng. grade) bh 200,000.00 - - 200,000.00 - 200,000.00 6,000.00 20,000.00 226,000.00 226,000.00
Pelat rambu (high I grade) m' 250,000.00 - - 250,000.00 - 250,000.00 7,500.00 25,000.00 282,500.00 282,500.00
Rel pengaman m' 550,000.00 - - 550,000.00 - 550,000.00 16,500.00 55,000.00 621,500.00 621,500.00
Pemantul cahaya (reflector) bh 56,000.00 - - 56,000.00 - 56,000.00 1,680.00 5,600.00 63,280.00 63,200.00
Minyak bekisting ltr 11,000.00 - - 11,000.00 - 11,000.00 330.00 1,100.00 12,430.00 12,400.00
Expansion Joint Tipe Baja Bersudut m' 600,000.00 - - 600,000.00 - 600,000.00 18,000.00 60,000.00 678,000.00 678,000.00
Perletakan Elastomerik Sintetis Ukuran (400x450x45 mm) bh 1,900,000.00 - - 1,900,000.00 - 1,900,000.00 57,000.00 190,000.00 2,147,000.00 2,147,000.00
21 BAHAN PAKU
Paku ukuran 1 - 4 cm kg 20,740.00 - - 20,740.00 - 20,740.00 622.20 2,074.00 23,436.20 23,400.00
Paku 5 cm - 12 cm kg 19,000.00 - - 19,000.00 - 19,000.00 570.00 1,900.00 21,470.00 21,400.00
SEMESTER : II, TAHUN ANGGARAN 2016
KECAMATAN TELUK AMBON BAGUALA (Triwulan II, Tahun 2017)
Galian C
MOS Price Overhead Jumlah PPN Total Pembulatan
Ongkos IMB
NO. URAIAN Unit Basic Price 15%
Angkut 20% x (4) x 7+8 3% x (9) 10%
4+5+6 x (7)
bj 10% x 9 9+10+11 "12" dibulatkan
Paku zink kg 24,950.00 - - 24,950.00 - 24,950.00 748.50 2,495.00 28,193.50 28,100.00
Paku jembatan kg 25,000.00 - - 25,000.00 - 25,000.00 750.00 2,500.00 28,250.00 28,200.00
Paku campur kg 23,900.00 - - 23,900.00 - 23,900.00 717.00 2,390.00 27,007.00 27,000.00
Paku beton warna putih 2 - 12 cm dos 39,312.50 - - 39,312.50 - 39,312.50 1,179.38 3,931.25 44,423.13 44,400.00
Paku beton warna hitam 3 - 7 cm dos 39,312.50 - - 39,312.50 - 39,312.50 1,179.38 3,931.25 44,423.13 44,400.00
Paku biasa kg 21,213.33 - - 21,213.33 - 21,213.33 636.40 2,121.33 23,971.07 23,900.00
Paku tripleks kg 27,500.00 - - 27,500.00 - 27,500.00 825.00 2,750.00 31,075.00 31,000.00
Paku/Sekrup genteng dos 26,600.00 - - 26,600.00 - 26,600.00 798.00 2,660.00 30,058.00 30,000.00
Paku Sekrup Gypsum 2 - 5 cm dos 24,000.00 - - 24,000.00 - 24,000.00 720.00 2,400.00 27,120.00 27,100.00
Baut 1/2" (6 - 25 cm) bh 30,000.00 - - 30,000.00 - 30,000.00 900.00 3,000.00 33,900.00 33,900.00
Skrup fixer bh 1,500.00 - - 1,500.00 - 1,500.00 45.00 150.00 1,695.00 1,600.00
22 BAHAN LEM
Sealant (lem kaca/lem kayu 32 gram, 85 gram) tube 15,750.00 - - 15,750.00 - 15,750.00 472.50 1,575.00 17,797.50 17,700.00
Lem kayu mrek Epoxy kg 150,000.00 - - 150,000.00 - 150,000.00 4,500.00 15,000.00 169,500.00 169,500.00
Lem karpet talang (merk tiber frog) tube 15,000.00 - - 15,000.00 - 15,000.00 450.00 1,500.00 16,950.00 16,900.00
Lem fiber glass (merk nuri lem super) tube 17,500.00 - - 17,500.00 - 17,500.00 525.00 1,750.00 19,775.00 19,700.00
Lem besi (dextone epoxy adhe sives 48 gram) tube 15,000.00 - - 15,000.00 - 15,000.00 450.00 1,500.00 16,950.00 16,900.00
Lem pipa (merk isarplas 45 gram) tube 10,000.00 - - 10,000.00 - 10,000.00 300.00 1,000.00 11,300.00 11,300.00
23 BAHAN FINISHING
Air ltr 50.00 - - 50.00 - 50.00 1.50 5.00 56.50 50.00
Amplas kayu / besi lbr 5,000.00 - - 5,000.00 - 5,000.00 150.00 500.00 5,650.00 5,600.00
Dempul kg 20,000.00 - - 20,000.00 - 20,000.00 600.00 2,000.00 22,600.00 22,600.00
Spirtus btl 18,000.00 - - 18,000.00 - 18,000.00 540.00 1,800.00 20,340.00 20,300.00
Minyak cat ltr 29,000.00 - - 29,000.00 - 29,000.00 870.00 2,900.00 32,770.00 32,700.00
Politur ltr 50,000.00 - - 50,000.00 - 50,000.00 1,500.00 5,000.00 56,500.00 56,500.00
Teak oil kg 42,500.00 - - 42,500.00 - 42,500.00 1,275.00 4,250.00 48,025.00 48,000.00
Okir kg 20,000.00 - - 20,000.00 - 20,000.00 600.00 2,000.00 22,600.00 22,600.00
Menie kayu kg 25,000.00 - - 25,000.00 - 25,000.00 750.00 2,500.00 28,250.00 28,200.00
Menie besi kg 25,000.00 - - 25,000.00 - 25,000.00 750.00 2,500.00 28,250.00 28,200.00
Cat besi kg 57,500.00 - - 57,500.00 - 57,500.00 1,725.00 5,750.00 64,975.00 64,900.00
Cat menie kg 35,000.00 - - 35,000.00 - 35,000.00 1,050.00 3,500.00 39,550.00 39,500.00
Cat dasar (cat minyak) kg 54,000.00 - - 54,000.00 - 54,000.00 1,620.00 5,400.00 61,020.00 61,000.00
Cat warna (cat penutup/cat minyak) kg 54,000.00 - - 54,000.00 - 54,000.00 1,620.00 5,400.00 61,020.00 61,000.00
Cat warna "gloteks" kg 54,000.00 - - 54,000.00 - 54,000.00 1,620.00 5,400.00 61,020.00 61,000.00
Cat warna "Nippe 2000" kg 65,000.00 - - 65,000.00 - 65,000.00 1,950.00 6,500.00 73,450.00 73,400.00
Cat tembok anti lumut ((wathershield)) kg 45,000.00 - - 45,000.00 - 45,000.00 1,350.00 4,500.00 50,850.00 50,800.00
Cat tembok kg 25,000.00 - - 25,000.00 - 25,000.00 750.00 2,500.00 28,250.00 28,200.00
Cat menie kg 35,000.00 - - 35,000.00 - 35,000.00 1,050.00 3,500.00 39,550.00 39,500.00
Plamir tembok kg 7,733.33 - - 7,733.33 - 7,733.33 232.00 773.33 8,738.67 8,700.00
Pelitur kg 27,500.00 - - 27,500.00 - 27,500.00 825.00 2,750.00 31,075.00 31,000.00
Minyak bekisting ltr 11,000.00 - - 11,000.00 - 11,000.00 330.00 1,100.00 12,430.00 12,400.00
SEMESTER : II, TAHUN ANGGARAN 2016
KECAMATAN TELUK AMBON BAGUALA (Triwulan II, Tahun 2017)
Galian C
MOS Price Overhead Jumlah PPN Total Pembulatan
Ongkos IMB
NO. URAIAN Unit Basic Price 15%
Angkut 20% x (4) x 7+8 3% x (9) 10%
4+5+6 x (7)
bj 10% x 9 9+10+11 "12" dibulatkan
Ijuk lbr 30,000.00 - - 30,000.00 - 30,000.00 900.00 3,000.00 33,900.00 33,900.00
Kwas Cat Pcs 10,500.00 - - 10,500.00 - 10,500.00 315.00 1,050.00 11,865.00 11,800.00
Kwas Rol Pcs 19,250.00 - - 19,250.00 - 19,250.00 577.50 1,925.00 21,752.50 21,700.00
Residu / Ter Galon 30,000.00 - - 30,000.00 - 30,000.00 900.00 3,000.00 33,900.00 33,900.00
Cat Tembok
Kapur api kg 9,000.00 - - 9,000.00 - 9,000.00 270.00 900.00 10,170.00 10,100.00
Plamir tembok kg 7,733.33 - - 7,733.33 - 7,733.33 232.00 773.33 8,738.67 8,700.00
Metrolite kelas A kg 35,000.00 - - 35,000.00 - 35,000.00 1,050.00 3,500.00 39,550.00 39,500.00
Metrolite kelas B kg 26,000.00 - - 26,000.00 - 26,000.00 780.00 2,600.00 29,380.00 29,300.00
Mowilex kelas A kg 88,500.00 - - 88,500.00 - 88,500.00 2,655.00 8,850.00 100,005.00 100,000.00
Mowilex kelas B kg 53,100.00 - - 53,100.00 - 53,100.00 1,593.00 5,310.00 60,003.00 60,000.00
Dulux Weathershield-A 918 kg 105,000.00 - - 105,000.00 - 105,000.00 3,150.00 10,500.00 118,650.00 118,600.00
Dulux Pantalite-A 922 kg 63,000.00 - - 63,000.00 - 63,000.00 1,890.00 6,300.00 71,190.00 71,100.00
Cat Aqua pro (tembok) kg 37,500.00 - - 37,500.00 - 37,500.00 1,125.00 3,750.00 42,375.00 42,300.00
Cat Waterproof kg 62,000.00 - - 62,000.00 - 62,000.00 1,860.00 6,200.00 70,060.00 70,000.00
Cat Avitex kg 30,000.00 - - 30,000.00 - 30,000.00 900.00 3,000.00 33,900.00 33,900.00
Cat Anti bocor no drob kg 51,000.00 - - 51,000.00 - 51,000.00 1,530.00 5,100.00 57,630.00 57,600.00
Addition addibond kg 43,500.00 - - 43,500.00 - 43,500.00 1,305.00 4,350.00 49,155.00 49,100.00
Waterproofing SIKA 1 kg kg 54,600.00 - - 54,600.00 - 54,600.00 1,638.00 5,460.00 61,698.00 61,600.00
Waterproofing SIKA 4 kg galon 190,000.00 - - 190,000.00 - 190,000.00 5,700.00 19,000.00 214,700.00 214,700.00
Waterproofing SIKA 20 kg zak 870,000.00 - - 870,000.00 - 870,000.00 26,100.00 87,000.00 983,100.00 983,100.00
Selang
Selang "Nipon" 1/2" m 9,000.00 - - 9,000.00 - 9,000.00 270.00 900.00 10,170.00 10,100.00
Selang "Nipon" 1/4" m 9,000.00 - - 9,000.00 - 9,000.00 270.00 900.00 10,170.00 10,100.00
Biasa 1/2" m 7,250.00 - - 7,250.00 - 7,250.00 217.50 725.00 8,192.50 8,100.00
Palu
Palu besar 6 kg bh 75,000.00 - - 75,000.00 - 75,000.00 2,250.00 7,500.00 84,750.00 84,700.00
Palu sedang bh 40,000.00 - - 40,000.00 - 40,000.00 1,200.00 4,000.00 45,200.00 45,200.00
Palu kecil bh 35,000.00 - - 35,000.00 - 35,000.00 1,050.00 3,500.00 39,550.00 39,500.00
Tual, 13 Juli 2015
Berdasarkan Keputusan Walikota Tual Nomor : 243 Tahun 2014 Tanggal 02 Desember 2014 tentang
Penetapan Anggota Unit Layanan Pengadaan Lingkup Pemerintah Kota Tual Tahun Anggaran 2015. Maka,
bersama ini kami sampaikan Permohonan untuk diadakan lelang atas Paket Pekerjaan :
Bersama ini kami lampirkan Harga Perkiraan Sendiri (HPS), Bill Of Quantity (BOQ), Gambar dan Spesifikasi
Teknis dan Rencana Acuan Kerja.
Sebagai bahan untuk Dokumen Lelang atas kerjasamanya disampaikan terima kasih.
Hormat Kami
Pejabat Pembuat Komitmen
(PPK)
__________________________
Nip. ___________________
A. UPAH
1 Mandor OH 94,700.00
2 Kepala Tukang OH 85,400.00
3 Kepala Tukang Kayu OH 85,400.00
4 Kepala Tukang Besi OH 85,400.00
5 Kepala Tukang Cat OH 85,400.00
6 Tukang OH 79,400.00
7 Tukang Batu OH 79,400.00
8 Tukang Kayu OH 79,400.00
9 Tukang Besi OH 79,400.00
10 Tukang Cat OH 79,400.00
11 Tukang Gali OH 79,400.00
12 Pekerja OH 55,000.00
13 Operator OH 79,400.00
14 Operator kurang terlatih OH 55,000.00
15 Pembantu operator OH 55,000.00
16 Supir OH 79,400.00
17 Pekerja Galian & Urugan OH 55,000.00
18 Tukang Listrik OH 79,400.00
19 Tukang Pipa OH 79,400.00
130
No. URAIAN SAT. HARGA (Rp.) KETERANGAN
B. BAHAN
B.1. Bahan Batu & Beton
1 Pasir urug m3 362,700.00
2 Tanah urug m3 79,900.00
3 Tanah katel m3 0.00
4 Pasir Pasang m3 362,700.00
5 Pasir Cor m3 362,700.00
6 Tanah sirtu ( Tasirtu ) m3 0.00
7 Sirtu m3 133,200.00
8 Batu pecah 15/20 ( pecah tangan ) m3 403,400.00
9 Batu pecah 10/15 ( pecah tangan ) m3 403,400.00
10 Kerikil Koral m3 180,000.00
11 Kerikil Beton uk. 3/5 cm m3 263,300.00
12 Batu pecah 2/3 [mekanis] m3 358,700.00
13 Batu pecah 1/2 [mekanis] m3 358,700.00
14 Batu Kali/Batu Belah/Batu Gunung m3 182,700.00
15 Batako uk. 20 x 40 x 10 bj 4,000.00
16 Batu Bata uk. 5,5 x 11 x 23 bj 2,400.00
17 Batu Tela uk. 20 x 30 x 10 bj 3,200.00
18 Batu Alam m2 256,200.00
19 Portland Cement @40 kg kg 2,430.00
20 PC warna @40 kg kg 5,600.00
21 Kapur Api Ayak kg 6,600.00
22 Paving stright. K.300 ( abu-abu ) tebal 8 cm m2 87,600.00
23 Paving stright. K.300 ( warna ) tebal 8 cm m2 87,600.00
24 Paving stone abu-abu / beton kelas 1 m2 104,900.00
25 Paving stone warna / beton kelas 1 m2 104,900.00
26 Beton kanstin bh 32,900.00
27 Roster 20 X 20 bh 44,900.00
28 Buis beton 1/2 dia. 20 cm bh 10,000.00
29 Buis beton ø 15 cm m' 26,900.00
30 Buis beton ø 20 cm m' 32,000.00
31 Buis beton ø 30 cm m' 35,900.00
32 Buis beton ø 40 cm m' 41,800.00
33 Buis beton ø 50 cm m' 64,200.00
34 Buis beton ø 60 cm m' 99,700.00
35 Buis beton bertulang ø 50 cm m' 363,600.00
36 Buis beton bertulang ø 60 cm m' 518,100.00
131
No. URAIAN SAT. HARGA (Rp.) KETERANGAN
132
No. URAIAN SAT. HARGA (Rp.) KETERANGAN
133
No. URAIAN SAT. HARGA (Rp.) KETERANGAN
134