Disusun Oleh:
Dian Condrowati (17050534001)
A. Soal................................................................................................................................................3
B. Diketahui .......................................................................................................................................3
C. Ditanya ..........................................................................................................................................3
D. Jawab .............................................................................................................................................3
UTS EBK ii
UTS ESTIMASI BIAYA KONSTRUKSI
A. Soal
sdsdvrfge
B. Diketahui
C. Ditanya
D. Jawab
UTS EBK 3
= 2,277
c. Beton f’c 19,3 MPa
1) Panjang kolom (p) = 0,55m
2) Lebar kolom (l) = 0,55m
3) Tinggi kolom (t) = 1,60m
4) Jumlah kolom pedestal ukuran 0,55m x 0,55m (n) = 1(X) = 11buah
5) Total volume beton =pxlxtxn
= 0,55m x 0,55m x 1,60m x 11 buah
= 5,324 m3
8) Koefisien Beton f’c 19,3 MPa
𝑡𝑜𝑡𝑎𝑙 𝑣𝑜𝑙𝑢𝑚𝑒 𝑏𝑒𝑡𝑜𝑛
=
𝑡𝑜𝑡𝑎𝑙 𝑣𝑜𝑙𝑢𝑚𝑒 𝑘𝑜𝑙𝑜𝑚
5,324 𝑚3
=
5,324 𝑚3
= 1,000
2. Bestat
a. Tulangan Pokok 16 D22
1.00m
0.10m
0.35m
25.d 25.d
15.d 15.d
UTS EBK 4
12,000𝑚
=
2,480𝑚
= 4,838 buah
= (dibulatkan jadi 4 buah)
16) Sisa panjang potongan
= 𝑝𝑎𝑛𝑗𝑎𝑛𝑔 𝑏𝑒𝑠𝑖 1 𝑙𝑜𝑛𝑗𝑜𝑟 − (𝑗𝑢𝑚𝑙𝑎ℎ 𝑝𝑜𝑡𝑜𝑛𝑔𝑎𝑛 𝑝𝑒𝑟𝑙𝑜𝑛𝑗𝑜𝑟 𝑥 𝑝𝑎𝑛𝑗𝑎𝑛𝑔 𝑝𝑜𝑡𝑜𝑛𝑔𝑎𝑛)
= 12,000m – (4buah x 2,480m)
= 2,08m
17) Kebutuhan tulangan
𝑗𝑢𝑚𝑙𝑎ℎ 𝑝𝑜𝑡𝑜𝑛𝑔𝑎𝑛
=
𝑗𝑢𝑚𝑙𝑎ℎ 𝑝𝑜𝑡𝑜𝑛𝑔𝑎𝑛 𝑝𝑒𝑟𝑙𝑜𝑛𝑗𝑜𝑟
176 𝑏𝑢𝑎ℎ
=
4 𝑏𝑢𝑎ℎ
= 44 lonjor (tulangan D22)
18) Koefisien tulangan 16 𝐷22
𝑡𝑜𝑡𝑎𝑙 𝑏𝑒𝑟𝑎𝑡 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛
=
𝑣𝑜𝑙𝑢𝑚𝑒 𝑘𝑜𝑙𝑜𝑚
1301,814258 𝑘𝑔
=
5,324 𝑚3
= 244,518074
UTS EBK 5
15) Koefisien tulangan ∅8
𝑡𝑜𝑡𝑎𝑙 𝑏𝑒𝑟𝑎𝑡 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛
=
𝑣𝑜𝑙𝑢𝑚𝑒 𝑘𝑜𝑙𝑜𝑚
157,9720887 𝑘𝑔
=
5,324 𝑚3
= 29,67169209
A. TENAGA
B. BAHAN
C. PERALATAN
D. Jumlah (A + B + C) Rp 955,986.00
UTS EBK 6
5) Jumlah tenaga kerja
= Jumlah harga pekerja + Jumlah harga tukang batu + Jumlah harga Kepala Tukang + Jumlah harga
Mandor
= Rp 165,000.00 + Rp 33,000.00 + Rp 3,640.00 + Rp 12,450.00
= Rp 214,090.00
6) Harga satuan semen
ℎ𝑎𝑟𝑔𝑎 𝑠𝑒𝑚𝑒𝑛 1 𝑧𝑎𝑘
=
𝑏𝑒𝑟𝑎𝑡 𝑠𝑒𝑚𝑒𝑛 1 𝑧𝑎𝑘
𝑅𝑝 46,000.00
=
40 𝑘𝑔
= Rp 1,150.00
7) Jumlah harga semen
= 𝑘𝑜𝑒𝑓𝑖𝑠𝑖𝑒𝑛 𝑠𝑒𝑚𝑒𝑛 1𝑚3 𝑥 ℎ𝑎𝑟𝑔𝑎 𝑠𝑎𝑡𝑢𝑎𝑛 𝑠𝑒𝑚𝑒𝑛
= 371 x Rp 1,150.00
= Rp 426,650.00
8) Harga satuan pasir beton
𝑘𝑜𝑒𝑓𝑖𝑠𝑖𝑒𝑛 𝑝𝑎𝑠𝑖𝑟 𝑏𝑒𝑡𝑜𝑛 1𝑚3
𝑥ℎ𝑎𝑟𝑔𝑎 𝑝𝑎𝑠𝑖𝑟 𝑏𝑒𝑡𝑜𝑛 1𝑚3
𝜌 𝑝𝑎𝑠𝑖𝑟 𝑏𝑒𝑡𝑜𝑛
=
𝑘𝑜𝑒𝑓𝑖𝑠𝑖𝑒𝑛 𝑝𝑎𝑠𝑖𝑟 𝑏𝑒𝑡𝑜𝑛 1𝑚3
698
𝑥 𝑅𝑝 270,000.00
1400 𝑘𝑔/𝑚3
=
698
= Rp 192.85
= (dibulatkan menjadi Rp 193.00)
9) Jumlah harga pasir beton
= 𝑘𝑜𝑒𝑓𝑖𝑠𝑖𝑒𝑛 𝑝𝑎𝑠𝑖𝑟 𝑏𝑒𝑡𝑜𝑛 1𝑚3 𝑥 ℎ𝑎𝑟𝑔𝑎 𝑠𝑎𝑡𝑢𝑎𝑛 𝑝𝑎𝑠𝑖𝑟 𝑏𝑒𝑡𝑜𝑛
= 698 x Rp 193.00
= Rp 134,714.00
10) Harga satuan kerikil
𝑘𝑜𝑒𝑓𝑖𝑠𝑖𝑒𝑛 kerikil 1𝑚3
𝑥ℎ𝑎𝑟𝑔𝑎 kerikil 1𝑚3
𝜌 𝑝𝑎𝑠𝑖𝑟 𝑏𝑒𝑡𝑜𝑛
=
𝑘𝑜𝑒𝑓𝑖𝑠𝑖𝑒𝑛 kerikil 1𝑚3
1047
𝑥 𝑅𝑝 210,000.00
1350𝑘𝑔/𝑚3
=
1047
= Rp 156.00
11) Jumlah harga kerikil
= 𝑘𝑜𝑒𝑓𝑖𝑠𝑖𝑒𝑛 kerikil 1𝑚3 𝑥 ℎ𝑎𝑟𝑔𝑎 𝑠𝑎𝑡𝑢𝑎𝑛 kerikil
= 1047 x Rp 156.00
= Rp 163,332.00
12) Jumlah harga air
= koefisien air x harga satuan air
= 215 x Rp 80.00
= Rp 17,200.00
13) Jumlah harga bahan
= Jumlah harga semen + Jumlah harga pasir beton + Jumlah harga kerikil + Jumlah harga air
= Rp 426,650.00 + Rp 134,714.00 + Rp 163,332.00 + Rp 17,200.00
= Rp 741,896.00
14) Jumlah (A + B + C)
= (Rp 214,090.00 + Rp 741,896.00 + Rp 000,000.00)
= Rp 955,986.00
15) Overhead & Profit (10%)
= Jumlah x 10%
= Rp 955,986.00 x 10%
= Rp 95,598.60
16) Harga satuan pekerjaan (D + E)
= (Rp 955,986.00 + Rp 95,598.60)
= Rp 1,051,600.00
b. A.4.1.1.17. Pembesian 10kg dengan besi polos atau besi ulir = Rp 11,182.60
A. TENAGA
UTS EBK 7
Pekerja L.01 OH 0,070 Rp 100,000.00 Rp 7,000.00
B. BAHAN
C. PERALATAN
D. Jumlah (A + B + C) Rp 101,660.00
A. TENAGA
B. BAHAN
C. PERALATAN
D. Jumlah (A + B + C) Rp 426,690.00
UTS EBK 9
2) Jumlah harga tukang batu
= koefisien x harga satuan
= 0,330 x Rp 120,000.00
= Rp 39,600.00
3) Jumlah harga Kepala Tukang
= koefisien x harga satuan
= 0,033 x Rp 130,000.00
= Rp 4,290.00
4) Jumlah harga Mandor
= koefisien x harga satuan
= 0,033 x Rp 150,000.00
= Rp 4,950.00
5) Jumlah tenaga kerja
= Jumlah harga pekerja + Jumlah harga tukang batu + Jumlah harga Kepala Tukang + Jumlah harga
Mandor
= Rp 66,000.00 + Rp 39,600.00 + Rp 4,290.00 + Rp 4,950.00
= Rp 114,840.00
6) Jumlah harga Kayu Kelas II
= 𝑘𝑜𝑒𝑓𝑖𝑠𝑖𝑒𝑛 Kayu Kelas II 1𝑚3 𝑥 ℎ𝑎𝑟𝑔𝑎 𝑠𝑎𝑡𝑢𝑎𝑛 Kayu Kelas II
= 0,040 x Rp 4,000,000.00
= Rp 160,000.00
7) Jumlah harga Paku 5cm – 12cm
= 𝑘𝑜𝑒𝑓𝑖𝑠𝑖𝑒𝑛 𝑃𝑎𝑘𝑢 5𝑐𝑚 – 12𝑐𝑚 1𝑚3 𝑥 ℎ𝑎𝑟𝑔𝑎 𝑠𝑎𝑡𝑢𝑎𝑛 Paku 5cm – 12cm
= 0,400 x Rp 25,000.00
= Rp 10,000.00
8) Jumlah harga Minyak bekisting
= 𝑘𝑜𝑒𝑓𝑖𝑠𝑖𝑒𝑛 𝑀𝑖𝑛𝑦𝑎𝑘 𝑏𝑒𝑘𝑖𝑠𝑡𝑖𝑛𝑔 1𝑚3 𝑥 ℎ𝑎𝑟𝑔𝑎 𝑠𝑎𝑡𝑢𝑎𝑛 Minyak bekisting
= 0,200 x Rp 28,000.00
= Rp 5,600.00
9) Jumlah harga Balok kayu kelas II
= 𝑘𝑜𝑒𝑓𝑖𝑠𝑖𝑒𝑛 𝐵𝑎𝑙𝑜𝑘 𝑘𝑎𝑦𝑢 𝑘𝑒𝑙𝑎𝑠 𝐼𝐼 1𝑚3 𝑥 ℎ𝑎𝑟𝑔𝑎 𝑠𝑎𝑡𝑢𝑎𝑛 Balok kayu kelas II
= 0,015 x Rp 4,500,000.00
= Rp 67,500.00
10) Jumlah harga Plywood tebal 9mm
= 𝑘𝑜𝑒𝑓𝑖𝑠𝑖𝑒𝑛 𝑃𝑙𝑦𝑤𝑜𝑜𝑑 𝑡𝑒𝑏𝑎𝑙 9𝑚𝑚 1𝑚3 𝑥 ℎ𝑎𝑟𝑔𝑎 𝑠𝑎𝑡𝑢𝑎𝑛 Plywood tebal 9mm
= 0,350 x Rp 145,000.00
= Rp 50,750.00
11) Jumlah harga Dolken kayu ∅8 – 10cm panjang 4m
= 𝑘𝑜𝑒𝑓𝑖𝑠𝑖𝑒𝑛 𝐷𝑜𝑙𝑘𝑒𝑛 𝑘𝑎𝑦𝑢 ∅8 – 10𝑐𝑚 𝑝𝑎𝑛𝑗𝑎𝑛𝑔 4𝑚 1𝑚3 𝑥 ℎ𝑎𝑟𝑔𝑎 𝑠𝑎𝑡𝑢𝑎𝑛 Dolken kayu ∅8 – 10cm
= 2,000 x Rp 9,000.00
= Rp 18,000.00
12) Jumlah harga bahan
= Jumlah harga Kayu Kelas II + Jumlah harga Paku 5cm – 12cm + Jumlah harga Paku 5cm – 12cm
+ Jumlah harga Minyak bekisting + Jumlah harga Balok kayu kelas II + Jumlah harga Plywood tebal
9mm + Jumlah harga Dolken kayu ∅8 – 10cm panjang 4m
= Rp 160,000.00 + Rp 10,000.00 + Rp 5,600.00 + Rp 67,500.00 + Rp 50,750.00 + Rp 18,000.00
= Rp 311,850.00
12) Jumlah (A + B + C)
= (Rp 114,840.00 + Rp 311,850.00+ Rp 000,000.00)
= Rp 426,690.00
13) Overhead & Profit (10%)
= Jumlah x 10%
= Rp 426,690.00 x 10%
= Rp 42,669.00
14) Harga satuan pekerjaan (D + E)
= (Rp 426,690.00 + Rp 42,669.00)
= Rp 469,359.00
UTS EBK 10
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
F. Dibulatkan Rp 5,186,500.00
(Rp) (Rp)
Jumlah Rp 27,612,926.00
UTS EBK 11
= dibulatkan menjadi Rp 27,613,000.00
UTS EBK 12