Analisa EI-311

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK : DINAS PEKERJAAN UMUM KABUPATEN DOMPU


No. PAKET KONTRAK : PENGADAAN JALAN KHUSUS
NAMA PAKET : PEMBUATAN JALAN PRODUKSI
………………………………………………………………….
PROP / KAB / KODYA : KABUPATEN DOMPU PROV. NTB
ITEM PEMBAYARAN NO. : 3.1.1.a PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Galian Biasa TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #VALUE!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.2376 12,100.00 2,875.38


2. Mandor (L03) Jam 0.0792 17,285.71 1,369.23

JUMLAH HARGA TENAGA 4,244.60

B. BAHAN

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1. Excavator (E10) Jam 0.0792 585,821.32 46,403.77


2. Dump Truck (E08) Jam 0.0000 148,674.83 0.00
3. Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 46,403.77

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 50,648.37


E. OVERHEAD & PROFIT 10.0 % x D 5,064.84
F. HARGA SATUAN PEKERJAAN ( D + E ) 55,713.21
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 3.1.1.a
JENIS PEKERJAAN : Galian Biasa
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SAT

No. URAIAN KODE KOEF. SATUAN

I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 0.83 -
6 Berat volume tanah (lepas) D 1.60 ton/m3

II. URUTAN KERJA


1 Tanah yang dipotong umumnya berada disisi jalan
2 Penggalian dilakukan dengan menggunakan Excavator
3 Selanjutnya Excavator menuangkan material hasil
galian kedalam Dump Truck
4 Dump Truck membuang material hasil galian keluar
lokasi jalan sejauh L 5.00 Km

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
Tidak ada bahan yang diperlukan

2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 1.00 -
Faktor Efisiensi alat Fa 0.83
Faktor konversi , kedalaman < 40 % Fv 0.90
Waktu siklus Ts1 menit
- Menggali , memuat T1 2.32 menit
- Lain lain T2 2.10 menit
Waktu siklus = T1 x Fv Ts1 4.42 menit

Kap. Prod. / jam = V x Fb x Fa x 60 Q1 12.62 M3/Jam


Ts1 x Fk

Koefisien Alat / M3 = 1 : Q1 (E10) 0.0792 Jam

2.b. DUMP TRUCK (E08)


Kapasitas bak V 2.70 ton
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 30.00 KM/Jam
Kecepatan rata-rata kosong v2 40.00 KM/Jam
Waktu siklus Ts2 menit
- Muat = (V x 60)/(D x Q1 x Fk) T1 9.66 menit
- Waktu tempuh isi = (L : v1) x 60 T2 10.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T3 7.50 menit
- Lain-lain T4 0.00 menit
Ts2 27.16 menit

Kapasitas Produksi / Jam = V x Fa x 60 Q2 3.73 M3/Jam


D x Fk x Ts2

Koefisien Alat / M3 = 1 : Q2 (E08) 0.0000 Jam

2.d. ALAT BANTU


Diperlukan alat-alat bantu kecil
- Sekop
- Keranjang

Berlanjut ke halaman be
Analisa EI-311

URAIAN ANALISA HARGA SATUAN

KETERANGAN

1.40 - 1.80

Faktor konversi
dihapus, masuk
dalam waktu siklus
disesuaikam

Lump Sump

Berlanjut ke halaman berikut


ITEM PEMBAYARAN NO. : 3.1.1.a
JENIS PEKERJAAN : Galian Biasa
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SAT

No. URAIAN KODE KOEF. SATUAN

3. TENAGA
Produksi menentukan : EXCAVATOR Q1 12.62 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 88.37 M3
Kebutuhan tenaga :
- Pekerja P 3.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.2376 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0792 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 55,713.21 / M3

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M3
Analisa EI-311

URAIAN ANALISA HARGA SATUAN


Lanjutan

KETERANGAN
Analisa EI-318

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK : DINAS PEKERJAAN UMUM KABUPATEN DOMPU


No. PAKET KONTRAK : PENGADAAN JALAN KHUSUS
NAMA PAKET : PEMBUATAN JALAN PRODUKSI
………………………………………………………………….
PROP / KAB / KODYA : KABUPATEN DOMPU PROV. NTB
ITEM PEMBAYARAN NO. : 3.1.7 PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Galian Perkerasan Beraspal tanpa Cold Milli TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #VALUE!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 1.5000 12,100.00 18,150.00


2. Mandor (L03) Jam 0.5000 17,285.71 8,642.86

JUMLAH HARGA TENAGA 26,792.86

B. BAHAN

JUMLAH HARGA BAHAN 0.00

C. PERALATAN
1. Jack Hammer E26 Jam 1.0040 34,310.63 34,448.43
2. Compresor E05 Jam 1.0040 142,626.10 143,198.90
3. Dump Truck E08 Jam 0.4706 148,674.83 69,964.39
4 Motor Greder E15 Jam 0.0000 384,445.28 0.00

JUMLAH HARGA PERALATAN 247,611.72

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 274,404.57


E. OVERHEAD & PROFIT 10.0 % x D 27,440.46
F. HARGA SATUAN PEKERJAAN ( D + E ) 301,845.03
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 3.1.7
JENIS PEKERJAAN : Galian Perkerasan Beraspal tanpa Cold Milling Machine
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SAT

No. URAIAN KODE KOEF. SATUAN

I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Tebal perkerasan aspal t 0.04 M
7 Berat volume perkerasan aspal (lepas) D 2.20 Ton/M3
8 Memakai Motor Grader ( yes = 1 , No = 0 ) 0

II. URUTAN KERJA


1 Perkerasan beton yg dibongkar umumnya adalah perkerasan jalan
2 Pembongkaran dilakukan dengan Jack Hammer
dan dimuat ke dalam truck secara manual.
3 Dump Truck membuang material hasil galian keluar
lokasi jalan sejauh : L 1.00 Km

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
Tidak ada bahan yang diperlukan

2. ALAT
2.a. JACK HAMMER + AIR COMPRESSOR
Kapasitas bongkar bk 2.00 m3/jam
Effesiensi kerja Fa 0.83
Kapa. Prod/jam = Fa x t x 60 Q1 0.996 M3
bk
Koefisien Alat / m3 = 1 : Q1 (E05/260 1.0040 Jam

2.b. DUMP TRUCK (E08)


Kapasitas bak V 6.00 M3
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 40.00 KM/Jam
Kecepatan rata-rata kosong v2 50.00 KM/Jam
Waktu siklus Ts1
- Muat = (V x 60)/(D x Q1 x Fk) T1 136.91 menit
- Waktu tempuh isi = (L : v1) x 60 T2 1.50 menit
- Waktu tempuh kosong = (L : v2) x 60 T3 1.20 menit
- Lain-lain T4 1.00 menit
Ts1 140.61 menit

Kapasitas Produksi / Jam = V x Fa x 60 Q2 2.13 M3 / Jam


Ts1
Koefisien Alat / m3 = 1 : Q2 (E08) 0.4706 Jam

MOTOR GRADER (E13)


Panjang hamparan Lh 50.00 M
Lebar Overlap bo 0.30 M
Faktor Efisiensi kerja Fa 0.80 -
Kecepatan rata-rata alat v 0.60 Km / Jam
Jumlah lintasan n 2 lintasan
Jumlah lajur lintasan N 1.00
Lebar pisau effektif b 1.6 M
Waktu siklus Ts3
- Perataan 1 kali lintasan Lh x 60 T1 5.00 menit
- Lain-lain v x 1000 T2 1.0 menit
Ts3 6.00 menit

Kapasitas Prod / Jam = Lh x (N x (b-bo)+bo) x t x Fa x 60 Q3 12.80 M3


Ts3 x n
Koefisien Alat / M3 = 1 : Q3 (E13) 0.0000 Jam
Analisa EI-318

URAIAN ANALISA HARGA SATUAN

KETERANGAN

301,845.03

301,845.03

0.996
Berlanjut ke halaman berikut
ITEM PEMBAYARAN NO. : 3.1.7
JENIS PEKERJAAN : Galian Perkerasan Beraspal tanpa Cold Milling Machine
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SAT

No. URAIAN KODE KOEF. SATUAN

3. TENAGA
Produksi menentukan : JACK HAMMER Q1 2.00 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 14.00 M3
Kebutuhan tenaga :
- Pekerja P 3.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 1.5000 Jam
- Mandor = (Tk x M) : Qt (L03) 0.5000 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 301,845.03 / M3

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M3
Analisa EI-318

URAIAN ANALISA HARGA SATUAN


Lanjutan

KETERANGAN
Analisa EI-321

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK : DINAS PEKERJAAN UMUM KABUPATEN DOMPU


No. PAKET KONTRAK : PENGADAAN JALAN KHUSUS
NAMA PAKET : PEMBUATAN JALAN PRODUKSI
………………………………………………………………….
PROP / KAB / KODYA : KABUPATEN DOMPU PROV. NTB
ITEM PEMBAYARAN NO. : 3.2.1 PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Timbunan Biasa ( Sirtu Gunung ) TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.1451 12,100.00 1,755.67


2. Mandor (L02) Jam 0.0725 17,285.71 1,254.05

JUMLAH HARGA TENAGA 3,009.72

B. BAHAN

1. Bahan timbunan ( Sirtu Gunung )(M08) M3 1.2000 20,000.00 24,000.00

JUMLAH HARGA BAHAN 24,000.00

C. PERALATAN
1. Excavator (E15) Jam 0.0725 384,445.28 27,890.84
2. Dump Truck (E08) Jam 0.3516 148,674.83 52,270.40
3. Motor Grader (E13) Jam 0.0269 460,054.36 12,363.96
4 Vibro Roller (E19) Jam 0.0013 384,938.88 483.11
5. Water tank truck (E23) Jam 0.0070 220,962.99 1,552.95
6 Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 94,561.26

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 121,570.97


E. OVERHEAD & PROFIT 10.0 % x D 12,157.10
F. HARGA SATUAN PEKERJAAN ( D + E ) 133,728.07
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 3.2.1
JENIS PEKERJAAN : Timbunan Biasa ( Sirtu Gunung )
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SAT

No. URAIAN KODE KOEF. SATUAN

I. ASUMSI
1 Pekerjaan dilakukan secara mekanis
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Tebal hamparan padat t 0.50 M
7 Berat volume bahan (lepas) D 1.60 Ton/M3

II. URUTAN KERJA


1 Excavator menggali dan memuat ke dalam dump truck
2 Dump Truck mengangkut ke lapangan dengan jarak
quari ke lapangan L 5.00 Km
3 Material diratakan dengan menggunakan Motor Grader
4 Material dipadatkan menggunakan Vibratory Roller
5 Selama pemadatan sekelompok pekerja akan
merapikan tepi hamparan dan level permukaan
dengan menggunakan alat bantu

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA


1. BAHAN
1.a. Bahan timbunan (sirtu = 1 x Fk (M08) 1.20 M3

2. ALAT
2.a. EXCAVATOR (E15)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 1.00 -
Faktor Efisiensi Alat Fa 0.83 -
Faktor Konversi Fv 0.90
Waktu sklus Ts1
- Menggali, memuat T1 1.50 menit
- Lain lain T2 1.30 menit
Waktu Siklus = T1 x Fv Ts1 2.80 menit

Kapasitas Produksi / Jam = V x Fb x Fa x 60 Q1 13.78 M3


Fk x Ts1

Koefisien alat / M3 = 1 : Q1 (E10) 0.0725 Jam

2.b. DUMP TRUCK (E08)


Kapasitas bak V 2.70 m3
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 30.00 KM/Jam
Kecepatan rata-rata kosong v2 40.00 KM/Jam
Waktusiklus : Ts2
- Waktu muat = = (V x 60)/(D x Fk x Q1) T1 6.12 menit
- Waktu tempuh isi = (L : v1) x 60 T2 10.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T3 7.50 menit
- Lain-lain T4 1.00 menit
Ts2 24.62 menit

Kapasitas Produksi / Jam = V x Fa x 60 Q2 2.84 M3


D x Fk x Ts2

Koefisien Alat / M3 = 1 : Q2 (E08) 0.3516 Jam

Berlanjut ke halaman be
Analisa EI-321

URAIAN ANALISA HARGA SATUAN

KETERANGAN

133,728.07

kondisi padat

133,728.07

Berlanjut ke halaman berikut


ITEM PEMBAYARAN NO. : 3.2.1
JENIS PEKERJAAN : Timbunan Biasa ( Sirtu Gunung )
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SAT

No. URAIAN KODE KOEF. SATUAN

2.c. MOTOR GRADER (E13)


Panjang hamparan Lh 25.00 M
Lebar Overlap bo 0.30 M
Faktor Efisiensi kerja Fa 0.80 -
Kecepatan rata-rata alat v 4.00 Km / Jam
Jumlah lintasan n 6 lintasan
Jumlah lajur lintasan N 1.00
Lebar pisau effektif b 2.0 M
Waktu siklus Ts3
- Perataan 1 kali lintasan Lh x 60 T1 0.38 menit
- Lain-lain v x 1000 T2 5.00 menit
Ts3 5.38 menit

Kapasitas Prod / Jam = Lh x (N(b-bo)+bo) x t x Fa x 60 Q3 37.21 M3


Ts3 x n

Koefisien Alat / M3 = 1 : Q3 (E13) 0.0269 Jam

2.d. VIBRATOR ROLLER (E19)


Kecepatan rata-rata alat v 4.00 Km / Jam
Lebar efektif pemadatan b 1.48 M
Jumlah lintasan n 8.00 lintasan
Lajur lintasan N 3.00
Lebar Overlap bo 0.30 M
Faktor efisiensi alat Fa 0.83 -

Kapasitas Prod./Jam (v x 1000) x (N(b-bo)+bo) x t x Fa Q4 796.80 M3


n

Koefisien Alat / M3 = 1 : Q4 (E19) 0.0013 Jam

2.e. WATER TANK TRUCK (E32)


Volume tangki air V 5.00 M3
Kebutuhan air/M3 material padat Wc 0.07 M3
Kapasitas pompa air pa 200.00 liter/menit
Faktor efisiensi alat Fa 0.83

Kapasitas Prod./Jam pa x Fa x 60 Q5 142.29 M3


1000 x Wc

Koefisien Alat / M3 = 1 : Q5 0.0070 jam

2.e. ALAT BANTU


Diperlukan alat-alat bantu kecil
- Sekop = 3 buah

3. TENAGA
Produksi menentukan : EXCAVATOR Q1 13.78 M3/Jam
Produksi Timbunan / hari = Tk x Q1 Qt 96.49 M3
Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.1451 Jam
- Mandor = (Tk x M) : Qt (L02) 0.0725 Jam
Analisa EI-321

URAIAN ANALISA HARGA SATUAN


Lanjutan

KETERANGAN

Lump Sump
Berlanjut ke halaman berikut
ITEM PEMBAYARAN NO. : 3.2.1
JENIS PEKERJAAN : Timbunan Biasa ( Sirtu Gunung )
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SAT

No. URAIAN KODE KOEF. SATUAN

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 133,728.07 / M3

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M3
Analisa EI-321

URAIAN ANALISA HARGA SATUAN


Lanjutan

KETERANGAN
Analisa EI-322

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK : DINAS PEKERJAAN UMUM KABUPATEN DOMPU


No. PAKET KONTRAK : PENGADAAN JALAN KHUSUS
NAMA PAKET : PEMBUATAN JALAN PRODUKSI
………………………………………………………………….
PROP / KAB / KODYA : KABUPATEN DOMPU PROV. NTB
ITEM PEMBAYARAN NO. : 3.2.2 PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Timbunan Pilihan ( Sirtu Kali ) TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #VALUE!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.8056 12,100.00 9,748.34


2. Mandor (L03) Jam 0.4028 17,285.71 6,963.10

JUMLAH HARGA TENAGA 16,711.44

B. BAHAN

1. Bahan pilihan ( Situ Kali ) (M09) M3 1.2000 25,000.00 30,000.00

JUMLAH HARGA BAHAN 30,000.00

C. PERALATAN
1. Excavator (E15) Jam 0.0975 384,445.28 37,500.28
2. Dump Truck (E08) Jam 0.4028 148,674.83 59,889.78
3. Motor Grader (E13) Jam 0.0067 460,054.36 3,077.46
3. Tandem (E17) Jam 0.0121 318,045.29 3,841.47
4. Water Tanker (E23) Jam 0.0070 220,962.99 1,552.95
5. Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 105,861.95

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 152,573.39


E. OVERHEAD & PROFIT 10.0 % x D 15,257.34
F. HARGA SATUAN PEKERJAAN ( D + E ) 167,830.73
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 3.2.2
JENIS PEKERJAAN : Timbunan Pilihan ( Sirtu Kali )
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SAT

No. URAIAN KODE KOEF. SATUAN

I. ASUMSI
1 Pekerjaan dilakukan secara mekanis
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Tebal hamparan padat t 0.20 M
7 Berat volume bahan (lepas) D 1.60 Ton/M3

II. URUTAN KERJA


1 Whell Loader memuat ke dalam Dump Truck
2 Dump Truck mengangkut ke lapangan dengan jarak
quari ke lapangan L 5.00 Km
3 Material dihampar dengan menggunakan Motor Grader
4 Hamparan material disiram air dengan Watertank Truck
(sebelum pelaksanaan pemadatan) dan dipadatkan
dengan menggunakan Tandem Roller
5 Selama pemadatan sekelompok pekerja akan
merapikan tepi hamparan dan level permukaan
dengan menggunakan alat bantu

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA


1. BAHAN
1.a. Bahan pilihan = 1 x Fk (M09) 1.20 M3

2. ALAT
2.a. EXCAVATOR (E15)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.85 -
Faktor Efisiensi Alat Fa 0.83 -
Faktor Konversi Ts1
Waktu sklus Mengali ,Memua & lain-lain T1 3.20 menit
Ts1 3.20 menit

Kapasitas Produksi / Jam = V x Fb x Fa x 60 Q1 10.25 M3


Fk x Ts1

Koefisienalat / M3 = = 1 : Q1 (E15) 0.0975 Jam

2.b. DUMP TRUCK (E08)


Kapasitas bak V 2.50 M3
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 30.00 Km / Jam
Kecepatan rata-rata kosong v2 40.00 Km / Jam
Waktusiklus : Ts2
- Waktu muat = = (V x 60)/(D x Fk x Q1) T1 7.62 menit
- Waktu tempuh isi = (L : v1) x 60 T2 10.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T3 7.50 menit
- Lain-lain T4 1.00 menit
Ts2 26.12 menit

Kapasitas Produksi / Jam = V x Fa x 60 Q2 2.48 M3


D x Fk x Ts2

Koefisien Alat / m3 = 1 : Q2 (E08) 0.4028 Jam

Berlanjut ke halaman be
Analisa EI-322

URAIAN ANALISA HARGA SATUAN

KETERANGAN

Berlanjut ke halaman berikut


ITEM PEMBAYARAN NO. : 3.2.2
JENIS PEKERJAAN : Timbunan Pilihan ( Sirtu Kali )
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SAT

No. URAIAN KODE KOEF. SATUAN

2.c. MOTOR GRADER (E13)


Panjang hamparan Lh 30.00 m
Lebar Efektif kerja Blade b 2.60 m
Lebar overlap bo 0.30 m
Faktor Efisiensi Alat Fa 0.80 -
Kecepatan rata-rata alat v 5.00 Km / Jam
Jumlah lintasan n 4.00 lintasan
Jumlah lajur lintasan N 2.00
Waktu siklus Ts3
- Perataan 1 kali lintasan = Lh : (v x 1000) x 60 T1 0.36 menit
- Lain-lain T2 2.00 menit
Ts3 2.36 menit

Kapasitas Produksi/Jam = Lh x (N(b-bo)+bo) x t x Fa x 60 Q3 149.49 M3


Ts3 x n

Koefisien Alat / m3 = 1 : Q3 (E13) 0.0067 Jam

2.d. TANDEM (E17)


Kecepatan rata-rata alat v 1.50 Km / jam
Lebar efektif pemadatan b 1.48 M
Jumlah lintasan n 8.00 lintasan
Jumlah lajur lintasan N 2.00
Lebar overlap bo 0.30 m
Waktu siklus Ts3
Faktor efisiensi alat Fa 0.83 -
Kapasitas Prod./Jam (v x 1000) x (N(b-bo)+bo) x t x Fa Q4 82.79 M3
n

Koefisien Alat / m3 = 1 : Q4 (E17) 0.0121 Jam

2.e. WATER TANK TRUCK (E23)


Volume tangki air V 4.00 M3
Kebutuhan air / M3 material padat Wc 0.07 M3
Kapasitas pompa air pa 200.00 liter/menit
Faktor efisiensi alat Fa 0.83 -

Kapasitas Produksi / Jam = pa x Fa x 60 Q5 142.29 M3


1000 x Wc

Koefisien Alat / m3 = 1 : Q5 (E23) 0.0070 Jam

2.f. ALAT BANTU


Diperlukan alat-alat bantu kecil
- Sekop = 3 buah

3. TENAGA
Produksi menentukan : DUMP TRUCK Q1 2.48 M3/Jam
Produksi Timbunan / hari = Tk x Q1 Qt 17.38 M3
Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.8056 Jam
- Mandor = (Tk x M) : Qt (L03) 0.4028 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.
Analisa EI-322

URAIAN ANALISA HARGA SATUAN


Lanjutan

KETERANGAN

Panduan

Lump Sump
Berlanjut ke halaman berikut
ITEM PEMBAYARAN NO. : 3.2.2
JENIS PEKERJAAN : Timbunan Pilihan ( Sirtu Kali )
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SAT

No. URAIAN KODE KOEF. SATUAN

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 167,830.73 / M3.

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M3
Analisa EI-322

URAIAN ANALISA HARGA SATUAN


Lanjutan

KETERANGAN
Analisa EI-715

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK : DINAS PEKERJAAN UMUM KABUPATEN DOMPU


No. PAKET KONTRAK : PENGADAAN JALAN KHUSUS
NAMA PAKET : PEMBUATAN JALAN PRODUKSI
………………………………………………………………….
PROP / KAB / KODYA : KABUPATEN DOMPU PROV. NTB
ITEM PEMBAYARAN NO. :7.1 (5) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN :Beton mutu sedang dengan fc’=30 MPa (K-350) TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN :M3 % THD. BIAYA PROYEK : #VALUE!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.8032 12,100.00 9,718.88


2. Tukang (L02) jam 1.8072 15,557.14 28,115.32
3. Mandor (L03) jam 0.1004 17,285.71 1,735.51

JUMLAH HARGA TENAGA 39,569.71

B. BAHAN

1. Semen (M12) Kg 469.6800 1,360.00 638,764.80


2. Pasir Beton (M01a) M3 0.5145 300,000.00 154,350.00
3. Agregat Kasar (M03) M3 0.7440 266,924.56 198,591.87
4. Kayu Perancah (M19) M3 0.4000 2,250,000.00 900,000.00
5. Paku (M18) Kg 3.2000 15,000.00 48,000.00

JUMLAH HARGA BAHAN 1,939,706.67

C. PERALATAN

1. Pan. Mixer E43 jam 0.1004 812,638.91 81,590.25


2. Truk Mixer E49 jam 0.5551 668,836.31 371,257.52
3. Water Tanker E23 jam 0.0382 220,962.99 8,430.31
4. Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 461,278.09

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 2,440,554.47


E. OVERHEAD & PROFIT 10.0 % x D 244,055.45
F. HARGA SATUAN PEKERJAAN ( D + E ) 2,684,609.92
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. :7.1 (5) Analisa EI-715
JENIS PEKERJAAN :Beton mutu sedang dengan fc’=30 MPa (K-350)
SATUAN PEMBAYARAN :M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 20.62 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Kadar Semen Minimum Ks 365 Kg/M3
7 Ukuran Agregat Maksimum Ag 19 mm
8 Perbandingan Air/Semen Maksimum Wcr 0.45 -
9 Perbandingan Camp. : Semen Sm 456.0 Kg/M3 Berdasarkan
: Pasir Ps 637.0 Kg/M3 JMF dari EE
: Agregat Kasar Kr 992.0 Kg/M3
10 Berat Isi :
- Beton D1 2.40 T/M3
- Semen D2 1.25 T/M3
- Pasir D3 1.30 T/M3
- Agregat Kasar D4 1.40 T/M3

II. URUTAN KERJA


1 Semen, pasir, batu kerikil dan air dicampur dan diaduk
menjadi beton dengan menggunakan Concrete Mixer
2 Beton di-cor ke dalam bekisting yang telah disiapkan
3 Penyelesaian dan perapihan setelah pemasangan

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
1.a. Semen (PC) = Sm x 1.03 (M12) 469.680 Kg
1.b. Pasir Beton = (Ps/1000 : D3) x 1.05 (M01a) 0.5145 M3 669
1.c. Agregat Kasar = (Kr/1000 : D4) x 1.05 (M03) 0.7440 M3 1,042
1.d. Kayu Perancah dan/atau Bekisting (M19) 0.4000 M3
1.e. Paku (M18) 3.2000 Kg

2. ALAT
2.a. CONCRETE PAN MIXER (BATCHING PLANT) (E43)
Kapasitas Alat V 600.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 1.00 menit
- Mengaduk T2 1.00 menit
- Menuang T3 0.50 menit
- Tunggu, dll. T4 0.50 menit
Ts 3.00 menit

Kap. Prod. / jam = V x Fa x 60 Q1 9.960 M3/jam


1000 x Ts

Koefisien Alat / M3 = 1 : Q1 (E43) 0.1004 jam

2.b. TRUK MIXER (E49)


Kapasitas drum V 5.00 M3
Faktor efisiensi alat Fa 0.83
Kecepatan rata rata bermuatan v1 20.00 km/jam
Kecepatan rata rata kosong v2 30.00 km/jam
Waktu siklus : (T1 + T2 + T3 + T4) Ts2
- memuat V : Q1 x 60 T1 30.12 menit
- tempuh isi L x 60 : v1 T2 61.86 menit
- tempuh kosong L x 60 : v2 T3 41.24 menit
- menumpahkan T4 5.00 menit
Ts 138.21 menit

Berlanjut ke hal. berikut.


ITEM PEMBAYARAN NO. :7.1 (5) Analisa EI-715
JENIS PEKERJAAN :Beton mutu sedang dengan fc’=30 MPa (K-350)
SATUAN PEMBAYARAN :M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

Kap. Prod. / jam = V x Fa x 60 Q2 1.80 M3


Ts2

Koefisien Alat / M3 = 1 : Q2 (E49) 0.5551 jam

2.b. WATER TANK TRUCK (E23)


Volume Tanki Air V 4.00 M3
Kebutuhan air / M3 beton Wc 0.19 M3
Faktor Efiesiensi Alat Fa 0.83 -
Kapasitas pompa air Pa 100.00 liter/menit

Kap. Prod. / jam = pa x Fa x 60 Q3 26.21 M3


1000 x Wc

Koefisien Alat / M3 = 1 : Q3 (E23) 0.0382 jam

2.c. ALAT BANTU


Alat bantu

3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 69.72 M3

Kebutuhan tenaga : - Mandor M 1.00 orang


- Tukang Tb 18.00 orang
- Tk Batu = 4 1 Tk = 20 m3 btn
- Tk Kayu = 14 1 Tk = 2 m3 kayu
- Pekerja P 8.00 orang

Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1004 jam
- Tukang = (Tk x Tb) : Qt (L02) 1.8072 jam
- Pekerja = (Tk x P) : Qt (L01) 0.8032 jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 2,684,609.92 / M3

6. MASA PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : ………………… bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M3
Analisa EI-718

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK : DINAS PEKERJAAN UMUM KABUPATEN DOMPU


No. PAKET KONTRAK : PENGADAAN JALAN KHUSUS
NAMA PAKET : PEMBUATAN JALAN PRODUKSI
………………………………………………………………….
PROP / KAB / KODYA : KABUPATEN DOMPU PROV. NTB
ITEM PEMBAYARAN NO. :7.1 (8) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN :Beton mutu rendah dengan fc’= 15 MPa (K-175) TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN :M3 % THD. BIAYA PROYEK : #VALUE!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 1.2851 12,100.00 15,550.20


2. Tukang (L02) jam 1.2851 15,557.14 19,993.12
3. Mandor (L03) jam 0.3213 17,285.71 5,553.64

JUMLAH HARGA TENAGA 41,096.96

B. BAHAN

1. Semen (M12) Kg 327.5400 1,360.00 445,454.40


2. Pasir beton (M01a) M3 0.5024 300,000.00 150,715.38
3. Agregat Kasar (M03) M3 0.9053 266,924.56 241,633.46
4. Kayu Perancah (M19) M3 0.1000 2,250,000.00 225,000.00
5. Paku (M18) Kg 0.8000 15,000.00 12,000.00

JUMLAH HARGA BAHAN 1,074,803.25

C. PERALATAN

1. Conc. Mixer E06 jam 0.3213 130,977.07 42,080.99


2. Water Tanker E23 jam 0.0382 220,962.99 8,430.31
3. Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 50,511.30

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,166,411.51


E. OVERHEAD & PROFIT 10.0 % x D 116,641.15
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,283,052.66
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. :7.1 (8) Analisa EI-718
JENIS PEKERJAAN :Beton mutu rendah dengan fc’= 15 MPa (K-175)
SATUAN PEMBAYARAN :M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 20.62 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Kadar Semen Minimum Ks 300 Kg/M3

7 Perbandingan Air/Semen Maksimum Wcr 0.57 -


8 Perbandingan Camp. : Semen Sm 318.0 Kg/M3 Berdasarkan
: Pasir Ps 622.0 Kg/M3 JMF dari EE
: Agregat Kasar Kr 1,207.0 Kg/M3
9 Berat Isi :
- Beton D1 2.40 T/M3
- Semen D2 1.25 T/M3
- Pasir D3 1.30 T/M3
- Agregat Kasar D4 1.40 T/M3

II. URUTAN KERJA


1 Semen, pasir, batu kerikil dan air dicampur dan diaduk
menjadi beton dengan menggunakan Concrete Mixer
2 Beton di-cor ke dalam bekisting yang telah disiapkan
3 Penyelesaian dan perapihan setelah pemasangan

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
1.a. Semen (PC) = Sm x 1.03 (M12) 327.540 Kg
1.b. Pasir Beton = (Ps/1000 : D3) x 1.05 (M01a) 0.5024 M3 653.10
1.c. Agregat Kasar = (Kr/1000 : D4) x 1.05 (M03) 0.9053 M3 1,267.35
1.d. Kayu Perancah dan/atau Bekisting (M19) 0.1000 M3
1.e. Paku (M18) 0.8000 Kg

2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 3.00 menit
- Mengaduk T2 2.00 menit
- Menuang T3 1.00 menit
- Tunggu, dll. T4 2.00 menit
Ts 8.00 menit

Kap. Prod. / jam = V x Fa x 60 Q1 3.113 M3/jam


1000 x Ts

Koefisien Alat / M3 = 1 : Q1 (E06) 0.3213 jam

2.b. WATER TANK TRUCK (E23)


Volume Tanki Air V 4.00 M3
Kebutuhan air / M3 beton Wc 0.19 M3
Faktor Efiesiensi Alat Fa 0.83 -
Kapasitas pompa air Pa 100.00 liter/menit

Kap. Prod. / jam = pa x Fa x 60 Q2 26.21 M3


1000 x Wc

Koefisien Alat / M3 = 1 : Q2 (E23) 0.0382 jam

Berlanjut ke hal. berikut.


ITEM PEMBAYARAN NO. :7.1 (8) Analisa EI-718
JENIS PEKERJAAN :Beton mutu rendah dengan fc’= 15 MPa (K-175)
SATUAN PEMBAYARAN :M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

2.c. ALAT BANTU


Alat bantu

3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 21.79 M3

Kebutuhan tenaga : - Mandor M 1.00 orang


- Tukang Tb 4.00 orang
- Tk Batu = 2 1 Tk = 20 m3 btn
- Tk Kayu = 2 1 Tk = 2 m3 kayu
- Pekerja P 4.00 orang

Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.3213 jam
- Tukang = (Tk x Tb) : Qt (L02) 1.2851 jam
- Pekerja = (Tk x P) : Qt (L01) 1.2851 jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 1,283,052.7 / M3

6. MASA PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : ............ bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M3
Analisa EI-731

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK : DINAS PEKERJAAN UMUM KABUPATEN DOMPU


No. PAKET KONTRAK : PENGADAAN JALAN KHUSUS
NAMA PAKET : PEMBUATAN JALAN PRODUKSI
………………………………………………………………….
PROP / KAB / KODYA : KABUPATEN DOMPU PROV. NTB
ITEM PEMBAYARAN NO. : 7.3 (1) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN :Baja Tulangan BJ 24 Polos TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Kg % THD. BIAYA PROYEK :

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja Biasa (L01) jam 0.2100 12,100.00 2,541.00


2. Tukang (L02) jam 0.0350 15,557.14 544.50
3. Mandor (L03) jam 0.0350 17,285.71 605.00

JUMLAH HARGA TENAGA 3,690.50

B. BAHAN

1. Baja Tulangan (Polos) (M39a) Kg 1.1000 13,500.00 14,850.00


2. Kawat Beton (M14) Kg 0.0100 15,000.00 150.00

JUMLAH HARGA BAHAN 15,000.00

C. PERALATAN

1. Alat Bantu Ls 1.0000 1,000.00 1,000.00

JUMLAH HARGA PERALATAN 1,000.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 19,690.50


E. OVERHEAD & PROFIT 10.0 % x D 1,969.05
F. HARGA SATUAN PEKERJAAN ( D + E ) 21,659.55
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 7.3 (1) Analisa EI-731
JENIS PEKERJAAN :Baja Tulangan BJ 24 Polos
SATUAN PEMBAYARAN : Kg URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 20.62 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor Kehilangan Besi Tulangan Fh 1.10 -

II. URUTAN KERJA


1 Besi tulangan dipotong dan dibengkokkan sesuai
dengan yang diperlukan
2 Batang tulangan dipasang / disusun sesuai dengan
Gambar Pelaksanaan dan persilangannya diikat kawat

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
1.a. Baja Tulangan (Polos) U24 (M39a) 1.1000 Kg
1.b. Kawat beton (M14) 0.0100 Kg

2. ALAT
2.a. ALAT BANTU Ls
Diperlukan :
- Gunting Potong Baja = 2 buah
- Kunci Pembengkok Tulangan = 2 buah
- Alat lainnya

3. TENAGA
Produksi kerja satu hari Qt 200.00 Kg
dibutuhkan tenaga : - Mandor M 1.00 orang
- Tukang Tb 1.00 orang
- Pekerja P 6.00 orang

Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt (L03) 0.0350 jam
- Tukang = ( Tb x Tk ) : Qt (L02) 0.0350 jam
- Pekerja = ( P x Tk ) : Qt (L01) 0.2100 jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 21,659.55 / Kg

6. MASA PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : ............ bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 Kg.
Analisa EI-79

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK : DINAS PEKERJAAN UMUM KABUPATEN DOMPU


No. PAKET KONTRAK : PENGADAAN JALAN KHUSUS
NAMA PAKET : PEMBUATAN JALAN PRODUKSI
………………………………………………………………….
PROP / KAB / KODYA : KABUPATEN DOMPU PROV. NTB
ITEM PEMBAYARAN NO. : 7.9 PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pasangan Batu TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja Biasa (L01) jam 3.6145 12,100.00 43,734.94


2. Tukang (L02) jam 1.2048 15,557.14 18,743.55
3. Mandor (L03) jam 0.6024 17,285.71 10,413.08

JUMLAH HARGA TENAGA 72,891.57

B. BAHAN

1. Batu Kali (M02) M3 1.1700 150,000.00 175,500.00


2. Semen (PC) (M12) Kg 187.0000 1,360.00 254,320.00
3. Pasir (M01) M3 0.5088 140,000.00 71,238.46

JUMLAH HARGA BAHAN 501,058.46

C. PERALATAN

1. Conc. Mixer (E06) jam 0.6024 130,977.07 78,901.85


2. Water Tanker (E23) jam 0.0014 220,962.99 310.59
3. Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 79,212.44

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 653,162.47


E. OVERHEAD & PROFIT 10.0 % x D 65,316.25
F. HARGA SATUAN PEKERJAAN ( D + E ) 718,478.71
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 7.9 Analisa EI-79
JENIS PEKERJAAN : Pasangan Batu
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 20.62 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Perbandingan Pasir & Semen : - Volume Semen Sm 25 % Spec.
: - Volume Pasir Ps 75 % Spec.
7 Perbandingan Batu & Mortar :
- Batu Bt 65 %
- Mortar (campuran semen & pasir) Mr 35 %
8 Berat Jenis Bahan :
- Pasangan Batu Dengan Mortar D1 2.40 ton/M3
- Batu D2 1.60 ton/M3
- Adukan (mortar) D3 1.70 ton/M3
- Pasir D4 1.30 ton/M3
- Semen Portland D5 1.44 ton/M3

II. URUTAN KERJA


1 Semen, pasir dan air dicampur dan diaduk menjadi
mortar dengan menggunakan Concrete Mixer
2 Batu dibersihkan dan dibasahi seluruh permukaannya
sebelum dipasang
3 Penyelesaian dan perapihan setelah pemasangan

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
1.a. Batu -----> {(Bt x D1 x 1 M3) : D2} x 1.20 (M02) 1.1700 M3 Lepas
1.b. Semen ----> Sm x {(Mr x D1 x 1 M3} : D3} x 1.05 (M12) 0.1297 M3
x {D5 x (1000)} (M12) 187.00 Kg
1.c. Pasir -----> Ps x {(Mr x D1 x 1 M3) : D4} x 1.05 (M01) 0.5088 M3

2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 4.00 menit
- Mengaduk T2 5.00 menit
- Menuang T3 4.00 menit
- Tunggu, dll. T4 2.00 menit
Ts 15.00 menit

Kap. Prod. / jam = V x Fa x 60 Q1 1.660 M3


1000 x Ts

Koefisien Alat / M3 = 1 : Q1 (E06) 0.6024 jam

2.b. WATER TANK TRUCK (E23)


Volume Tanki Air V 4.00 M3
Kebutuhan air / M3 beton Wc 0.007 M3
Faktor Efiesiensi Alat Fa 0.83 -
Kapasitas pompa air Pa 100.00 liter/menit

Kap. Prod. / jam = pa x Fa x 60 Q2 711.43 M3


1000 x Wc

Koefisien Alat / M3 = 1 : Q2 (E23) 0.0014 jam

Berlanjut ke hal. berikut.


PROYEK : 7.9 Analisa EI-79
JENIS PEKERJAAN : Pasangan Batu
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

2.c. ALAT BANTU


Diperlukan :
- Sekop = 2 buah
- Pacul = 2 buah
- Sendok Semen = 2 buah
- Ember Cor = 2 buah
- Gerobak Dorong = 1 buah

3. TENAGA
Produksi menetukan : Produksi Concrete Mxer Q1 1.660 M3/Jam
Produksi Pasangan Batu dengan Mortar / hari = Tk x Q1 Qt 11.62 M3
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Batu Tb 2.00 orang
- Pekerja P 6.00 orang

Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.6024 jam
- Tukang = (Tk x Tb) : Qt (L02) 1.2048 jam
- Pekerja = (Tk x P) : Qt (L01) 3.6145 jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 718,478.71 / M3

6. MASA PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M3
HARGA DASAR SATUAN UPAH
HARGA
No. URAIAN KODE SATUAN SATUAN KETERANGAN
( Rp.)

1. Pekerja (L01) Jam 12,100.00 84,700.00


2. Tukang (L02) Jam 15,557.14 108,900.00
3. Mandor (L03) Jam 17,285.71 121,000.00
4. Operator (L04) Jam 17,285.71 121,000.00
5. Pembantu Operator (L05) Jam 12,964.29 90,750.00
6. Sopir / Driver (L06) Jam 17,285.71 121,000.00
7. Pembantu Sopir / Driver (L07) Jam 11,235.71 78,650.00
8. Mekanik (L08) Jam 17,285.71 121,000.00
9. Pembantu Mekanik (L09) Jam 14,692.86 102,850.00
10. Kepala Tukang (L10) Jam 19,014.29 133,100.00
11.
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
DAFTAR
HARGA DASAR SATUAN BAHAN
HARGA
No. URAIAN KODE SATUAN SATUAN KETERANGAN
( Rp.)

1 Pasir Pasang (Sedang) M01b M3 140,000.00 Base Camp


2 Pasir Beton (Kasar) M01a M3 300,000.00 Base Camp
3 Pasir Halus (untuk HRS) M01c M3 123,869.59 Base Camp
4 Pasir Urug (ada unsur lempung) M01d M3 30,600.00 Base Camp
5 Batu Kali M02 M3 150,000.00 Lokasi Pekerjaan
6 Agregat Kasar M03 M3 266,924.56 Base Camp
7 Agregat Halus M04 M3 266,924.56 Base Camp
8 Filler M05 Kg 2,500.00 Proses/Base Camp
9 Batu Belah / Kerakal M06 M3 102,200.00 Lokasi Pekerjaan
10 Gravel M07 M3 91,700.00 Base Camp
11 Bahan Tanah Timbunan ( Sirtu Gunung ) M08 M3 20,000.00 Borrow Pit/quarry
12 Bahan Pilihan ( Sirtu Kali ) M09 M3 25,000.00 Quarry
13 Aspal M10 KG 10,000.00 Distributor
14 Kerosen / Minyak Tanah M11 LITER 7,446.00 Base Camp
15 Semen / PC (50kg) M12 Zak 68,000.00 Base Camp
16 Semen / PC (kg) M12 Kg 1,360.00 Base Camp
17 Besi Beton M13 Kg 13,500.00 Lokasi Pekerjaan
18 Kawat Beton M14 Kg 15,000.00 Lokasi Pekerjaan
19 Kawat Bronjong M15 Kg 12,000.00 Lokasi Pekerjaan
20 S i r t u Saring M16 M3 58,400.00 Lokasi Pekerjaan
21 Cat Marka (Non Thermoplas) M17a Kg 61,772.73 Lokasi Pekerjaan
22 Cat Marka (Thermoplastic) M17b Kg 71,762.09 Lokasi Pekerjaan
23 Paku M18 Kg 15,000.00 Lokasi Pekerjaan
24 Kayu Perancah M19 M3 2,250,000.00 Lokasi Pekerjaan
25 Bensin M20 LITER 7,337.00 Pertamina
26 Solar M21 LITER 7,150.00 Pertamina
27 Minyak Pelumas / Olie M22 LITER 23,500.00 Pertamina
28 Plastik Filter M23 M2 7,461.25 Lokasi Pekerjaan
29 Pipa Galvanis Dia. 1.5" M24 Batang 391,620.00 Lokasi Pekerjaan
30 Pipa Porus M25 M' 32,500.00 Lokasi Pekerjaan
31 Bahan Agr.Base Kelas A M26 M3 289,480.64 Base Camp
32 Bahan Agr.Base Kelas B M27 M3 241,983.22 Base Camp
33 Bahan Agr.Base Kelas C M28 M3 174,965.45 Base Camp
35 Geotextile M30 M2 16,912.17 Lokasi Pekerjaan
36 Aspal Emulsi M31 Kg 12,268.74 Base Camp
37 Gebalan Rumput M32 M2 14,583.33 Lokasi Pekerjaan
38 Pohon Sengon M32a Batang 10,000.00
39 Thinner M33 LITER 23,532.08 Lokasi Pekerjaan
40 Glass Bead M34 Kg 38,798.50 Lokasi Pekerjaan
41 Pelat Rambu (Eng. Grade) M35a BH 511,918.77 Lokasi Pekerjaan
42 Pelat Rambu (High I. Grade) M35b BH 881,666.67 Lokasi Pekerjaan
43 Rel Pengaman M36 M' 1,268,333.33 Lokasi Pekerjaan
44 Beton K-250 M37 M3 1,441,392.25 Lokasi Pekerjaan
45 Patok Beton K-175 M38 M3 1,166,411.51 Lokasi Pekerjaan
46 Baja Tulangan (Polos) U24 M39a Kg 13,500.00 Lokasi Pekerjaan
47 Baja Tulangan (Ulir) D32 M39b Kg 14,000.00 Lokasi Pekerjaan
48 Kapur M40 Kg 1,000.00 Hasil Proses
49 Chipping M41 M3 171,363.64 Base Camp
50 Chipping (kg) M41kg Kg 90.92 Base Camp
51 Cat M42 Kg 61,532.34 Base Camp
51 Pasir Urug M44 M3 84,808.33 Base Camp
52 Baja Bergelombang M46 Kg 18,700.00 Lokasi Pekerjaan
53 Beton K-125 M47 M3 1,043,095.58 Lokasi Pekerjaan
54 Tiang Pancang Baja M49 M' 1,857,272.73 Lokasi Pekerjaan
55 Kawat Las M51 Dos 30,000.00 Lokasi Pekerjaan
56 Pipa Baja M52 Kg 14,922.50 Pelabuhan terdekat
57 Minyak Fluks M53 Liter 2,750.00 Base Camp
59 Baja Prategang M56 Kg 7,958.67 Base Camp
60 Baja Tulangan (Polos) U32 M57a Kg 18,000.00 Lokasi Pekerjaan
61 Baja Tulangan (Ulir) D39 M39c Kg 19,000.00 Lokasi Pekerjaan
62 Baja Tulangan (Ulir) D48 M39d Kg 20,500.00 Lokasi Pekerjaan
63 Beton K-300 M59 M3 1,871,090.66 Lokasi Pekerjaan
64 Beton K-175 M60 M3 1,166,411.51 Lokasi Pekerjaan
65 Elastomer M62 buah 795,866.76
66 Mata Kucing M64 buah 74,612.51
67 Anchorage M65 buah 477,520
68 Anti strpping agent M66 liter 66,653.84
69 Beton K-500 M68 M3 2,528,387.38
70 Beton K-400 M69 M3 2,434,037.40
71 Beton K-350 M72 M3 2,440,554.47
72 Multipleks 12 mm M73 Lbr 202,000.00
73 Elastomer jenis 1 M74a buah 477,520.06 Base Camp
74 Elastomer jenis 2 M74b buah 646,641.75 Base Camp
75 Elastomer jenis 3 M74c buah 795,866.76 Base Camp
76 Expansion Tipe Joint Asphaltic Plug M75d M 994,833.45 Base Camp
77 Expansion Join Tipe Rubber M75e M 1,193,800.15 Base Camp
78 Expansion Join Baja Siku M75f M 189,018.36 Base Camp
79 Marmer M76 Buah 270,710.00 Base Camp
80 Paving Block M78 Buah 2,310.00 Lokasi Pekerjaan
81 Batu Bara M88 Kg 596.90 Lokasi Pekerjaan
82 Pipa Galvanis Dia 3" M24a M' 82,690.00
83 Pipa Galvanis Dia 1,5" M24b M' 41,345.00
84 Agregat Pecah Mesin 0-5 mm M91 M3 266,924.56 Base Camp
85 Agregat Pecah Mesin 5-10 & 10-20 mm M92 M3 266,924.56 Base Camp
86 Agregat Pecah Mesin 20-30 mm M93 M3 266,924.56 Base Camp
87 Joint Sealent M94 Kg 33,824.34
88 Cat Anti Karat M95 Kg 27,500.00
89 Curing Compound M98 Ltr 59,690.01
90 Kayu Acuan M99 M3 1,625,000.00
91 Additive M67a Ltr 34,819.17
92 Casing M100 M2
93 Pasir Tailing M3 338,243.37 Base Camp
94 Aditif anti pengelupasan Kg 79,984.61
95 Bahan Pengisi (Filler) Tambahan Kg 1,320.00
96 Dolken btg 25,000.00
97 Ijuk Kg 25,000.00
98
99
100
HARGA PEROLEHAN ALAT
Harga HARGA Harga
No. Jenis Alat yang KEPMEN Alat
digunakan 2004 BPJN VIII

1 Asphalt Mixing Plant 3,783,299,913 2,000,000,000.00 2,500,000,000


2 Asphalt Finisher 567,494,987 300,000,000.00 3,367,000,000
3 Asphalt Sprayer 218,674,735 115,600,000.00 115,600,000
4 Bulldozer 100-150 Hp 1,368,041,248 723,200,000.00
5 Compressor 4000-6500 L\M 113,498,997 60,000,000.00 150,000,000
6 Concrete Mixer 0.3-0.6 M3 124,848,897 66,000,000.00 15,000,000
7 Crane 10-15 Ton 499,395,588 264,000,000.00 890,000,000
8 Dump Truck 3-4 M3 226,997,995 150,000,000.00 308,000,000
9 Dump Truck 321,580,493 170,000,000.00 961,500,000
10 Excavator 80-140 Hp 1,607,902,463 850,000,000.00 1,600,000,000
11 Flat Bed Truck 3-4 M3 249,697,794 132,000,000.00
12 Generator Set 425,621,240 225,000,000.00 127,156,000
13 Motor Grader >100 Hp 1,038,515,826 549,000,000.00 1,489,548,450
14 Track Loader 75-100 Hp 1,015,816,027 537,000,000.00
15 Wheel Loader 1.0-1.6 M3 953,391,578 504,000,000.00 1,207,987,000
16 Three Wheel Roller 6-8 T 629,919,435 333,000,000.00 650,000,000
17 Tandem Roller 6-8 T. 749,093,383 396,000,000.00 1,129,528,000
18 Tire Roller 8-10 T. 873,942,280 462,000,000.00 1,098,447,000
19 Vibratory Roller 5-8 T. 1,045,136,601 552,500,000.00 450,000,000
20 Concrete Vibrator 13,241,550 7,000,000.00 10,000,000
21 Stone Crusher 1,859,491,907 983,000,000.00 1,500,000,000
22 Water Pump 70-100 Mm 14,187,375 7,500,000.00 5,000,000
23 Water Tanker 3000-4500 L. 204,298,195 108,000,000.00 614,000,000
24 Pedestrian Roller 245,914,494 130,000,000.00
25 Tamper 17,024,850 9,000,000.00 23,000,000
26 Jack Hammer 17,970,675 9,500,000.00 15,000,000
27 Fulvi Mixer 87,015,898 46,000,000.00
28 Concrete Pump 597,761,386 316,000,000.00
29 Trailer 20 Ton 459,670,939 243,000,000.00
30 Pile Driver + Hammer 244,022,844 129,000,000.00
31 Crane On Track 35 Ton 1,231,464,122 651,000,000.00
32 Welding Set 45,399,599 24,000,000.00
33 Bore Pile Machine 9,456,736,462 4,999,200,000.00

34 Asphalt Liquid Mixer 28,374,749 15,000,000.00

35 Trailler 15 Ton 851,242,480 450,000,000.00


36 Rock Drill Breaker 1,702,484,961 900,000,000.00
37 Cold Milling 9,354,209,034 4,945,000,000.00
38 Cold Recycler 36,887,174,148 19,500,000,000.00
39 Hot Recycler 55,330,761,222 29,250,000,000.00
40 Aggregat (chip) Spreader 747,201,733 395,000,000.00
41 Asphalt Distribution 747,201,733 395,000,000.00 25,000,000
42 Split Form Paver 2,529,406,227 1,337,142,857.00
43 Concrete Pan Mixer 1,891,649,956 1,000,000,000.00
44 Concrete Breaker 1,702,484,961 900,000,000.00
45 Asphalt Tanker 945,824,978 500,000,000.00
46 Cement Tanker 945,824,978 500,000,000.00
47 Concrete Mixer (350) 66,207,748 35,000,000.00
48 Vibrating Rammer 37,832,999 20,000,000.00
49 Truk Mixer 1,418,737,467 750,000,000.00
50 Bore Pile Machine Dia 60 2,213,230,449 1,170,000,000.00
51 Crane On Track 75 - 100Ton 1,702,484,961 900,000,000.00
52 Blending Equipment 945,824,978 500,000,000.00 500,000,000
53 Asphalt Liquid Mixer (kap 20000) 283,747,493 150,000,000.00
54 Alat tambahan Batubara Direct 567,494,987 300,000,000
55 Alat tambahan Gas Batubara 1,513,319,965 800,000,000
56 Chain Saw -
Harga Harga Alat setelah D
Alat Inflasi 2005 Inflasi 2006 Inflasi 2007 Inflasi 2008
PU & BPS 2011 8.81% 5.32% 11.77% 11.06%

2,176,200,000 2,291,973,840 2,561,739,161 2,845,067,512


326,430,000 343,796,076 384,260,874 426,760,127
125,784,360 132,476,088 148,068,524 164,444,902
1,750,000,000 786,913,920 828,777,741 926,324,881 1,028,776,412
65,286,000 68,759,215 76,852,175 85,352,025
8,000,000 71,814,600 75,635,137 84,537,392 93,887,228
287,258,400 302,540,547 338,149,569 375,548,912
237,000,000 163,215,000 171,898,038 192,130,437 213,380,063
184,977,000 194,817,776 217,747,829 241,830,739
1,342,160,000 924,885,000 974,088,882 1,088,739,143 1,209,153,693
208,400,000 143,629,200 151,270,273 169,074,785 187,774,456
244,822,500 257,847,057 288,195,656 320,070,095
2,300,000,000 597,366,900 629,146,819 703,197,400 780,971,032
584,309,700 615,394,976 687,826,965 763,900,627
900,000,000 548,402,400 577,577,408 645,558,269 716,957,013
700,000,000 362,337,300 381,613,644 426,529,570 473,703,741
500,000,000 430,887,600 453,810,820 507,224,354 563,323,367
502,702,200 529,445,957 591,761,746 657,210,595
1,180,000,000 601,175,250 633,157,773 707,680,443 785,949,900
11,000,000 7,616,700 8,021,908 8,966,087 9,957,736
1,069,602,300 1,126,505,142 1,259,094,798 1,398,350,682
11,843,000 8,160,750 8,594,902 9,606,522 10,669,003
117,514,800 123,766,587 138,333,915 153,633,646
205,271,000 141,453,000 148,978,300 166,513,045 184,929,388
9,792,900 10,313,882 11,527,826 12,802,804
15,000,000 10,336,950 10,886,876 12,168,261 13,514,071
50,052,600 52,715,398 58,920,001 65,436,553
490,000,000 343,839,600 362,131,867 404,754,787 449,520,667
264,408,300 278,474,822 311,251,308 345,675,703
140,364,900 147,832,313 165,232,176 183,506,855
708,353,100 746,037,485 833,846,097 926,069,475
37,988,200 26,114,400 27,503,686 30,740,870 34,140,810
5,439,629,520 5,729,017,810 6,403,323,207 7,111,530,753

16,321,500 17,189,804 19,213,044 21,338,006

489,645,000 515,694,114 576,391,311 640,140,190


1,421,000,000 979,290,000 1,031,388,228 1,152,782,622 1,280,280,380
4,945,000,000 5,380,654,500 5,666,905,319 6,333,900,075 7,034,429,424
21,217,950,000 22,346,744,940 24,976,956,819 27,739,408,244
31,826,925,000 33,520,117,410 37,465,435,229 41,609,112,366
429,799,500 452,664,833 505,943,484 561,900,834
429,799,500 452,664,833 505,943,484 561,900,834
2,111,365,200 1,454,945,143 1,532,348,224 1,712,705,610 1,902,130,851
1,088,100,000 1,145,986,920 1,280,869,580 1,422,533,756
979,290,000 1,031,388,228 1,152,782,622 1,280,280,380
789,506,200 544,050,000 572,993,460 640,434,790 711,266,878
789,506,200 544,050,000 572,993,460 640,434,790 711,266,878
38,083,500 40,109,542 44,830,435 49,788,681
21,762,000 22,919,738 25,617,392 28,450,675
816,075,000 859,490,190 960,652,185 1,066,900,317
1,273,077,000 1,340,804,696 1,498,617,409 1,664,364,495
979,290,000 1,031,388,228 1,152,782,622 1,280,280,380
544,050,000 572,993,460 640,434,790 711,266,878
163,215,000 171,898,038 192,130,437 213,380,063
326,430,000 343,796,076 384,260,874 426,760,127
870,480,000 916,789,536 1,024,695,664 1,138,027,005
Harga Alat setelah Dikalikan Inflasi (year on year)
Inflasi 2009 Inflasi 2010 2011 2012 2013 2013
2.78% 6.96% 3.79% 4.32% 4.90% 6.50%

2,924,160,389 3,127,681,952 3,246,221,098 3,386,457,850 3,552,394,284 3,783,299,913


438,624,058 469,152,293 486,933,165 507,968,677 532,859,143 567,494,987
169,016,470 180,780,017 187,631,579 195,737,264 205,328,390 218,674,735
1,057,376,397 1,130,969,794 1,173,833,549 1,224,543,158 1,284,545,773 1,368,041,248
87,724,812 93,830,459 97,386,633 101,593,735 106,571,829 113,498,997
96,497,293 103,213,504 107,125,296 111,753,109 117,229,011 124,848,897
385,989,171 412,854,018 428,501,185 447,012,436 468,916,046 499,395,588
219,312,029 234,576,146 243,466,582 253,984,339 266,429,571 226,997,995
248,553,633 265,852,966 275,928,793 287,848,917 301,953,514 321,580,493
1,242,768,165 1,329,264,830 1,379,643,967 1,439,244,586 1,509,767,571 1,607,902,463
192,994,586 206,427,009 214,250,592 223,506,218 234,458,023 249,697,794
328,968,044 351,864,220 365,199,874 380,976,508 399,644,357 425,621,240
802,682,027 858,548,696 891,087,691 929,582,680 975,132,231 1,038,515,826
785,137,064 839,782,604 871,610,365 909,263,933 953,817,865 1,015,816,027
736,888,418 788,175,852 818,047,717 853,387,378 895,203,360 953,391,578
486,872,705 520,759,045 540,495,813 563,845,232 591,473,648 629,919,435
578,983,757 619,281,027 642,751,777 670,518,654 703,374,068 749,093,383
675,481,050 722,494,531 749,877,074 782,271,763 820,603,080 873,942,280
807,799,307 864,022,139 896,768,578 935,508,981 981,348,921 1,045,136,601
10,234,561 10,946,887 11,361,774 11,852,602 12,433,380 13,241,550
1,437,224,831 1,537,255,679 1,595,517,670 1,664,444,033 1,746,001,791 1,859,491,907
10,965,601 11,728,807 12,173,329 12,699,217 13,321,479 14,187,375
157,904,661 168,894,825 175,295,939 182,868,724 191,829,291 204,298,195
190,070,425 203,299,327 211,004,371 220,119,760 230,905,628 245,914,494
13,158,722 14,074,569 14,607,995 15,239,060 15,985,774 17,024,850
13,889,762 14,856,489 15,419,550 16,085,675 16,873,873 17,970,675
67,255,689 71,936,685 74,663,085 77,888,531 81,705,069 87,015,898
462,017,341 494,173,748 512,902,933 535,060,340 561,278,297 597,761,386
355,285,487 380,013,357 394,415,863 411,454,629 431,615,906 459,670,939
188,608,345 201,735,486 209,381,261 218,426,531 229,129,431 244,022,844
951,814,207 1,018,060,475 1,056,644,967 1,102,292,030 1,156,304,339 1,231,464,122
35,089,925 37,532,183 38,954,653 40,637,494 42,628,731 45,399,599
7,309,231,308 7,817,953,807 8,114,254,257 8,464,790,041 8,879,564,753 9,456,736,462

21,931,203 23,457,615 24,346,658 25,398,434 26,642,957 28,374,749

657,936,088 703,728,439 730,399,747 761,953,016 799,288,714 851,242,480


1,315,872,175 1,407,456,878 1,460,799,494 1,523,906,032 1,598,577,428 1,702,484,961
7,229,986,562 7,733,193,627 8,026,281,665 8,373,017,033 8,783,294,868 9,354,209,034
28,510,563,793 30,494,899,033 31,650,655,706 33,017,964,033 34,635,844,270 36,887,174,148
42,765,845,689 45,742,348,549 47,475,983,559 49,526,946,049 51,953,766,405 55,330,761,222
577,521,677 617,717,186 641,128,667 668,825,425 701,597,871 747,201,733
577,521,677 617,717,186 641,128,667 668,825,425 701,597,871 747,201,733
1,955,010,088 2,091,078,791 2,170,330,677 2,264,088,962 2,375,029,321 2,529,406,227
1,462,080,195 1,563,840,976 1,623,110,549 1,693,228,925 1,776,197,142 1,891,649,956
1,315,872,175 1,407,456,878 1,460,799,494 1,523,906,032 1,598,577,428 1,702,484,961
731,040,097 781,920,488 811,555,275 846,614,462 888,098,571 945,824,978
731,040,097 781,920,488 811,555,275 846,614,462 888,098,571 945,824,978
51,172,807 54,734,434 56,808,869 59,263,012 62,166,900 66,207,748
29,241,604 31,276,820 32,462,211 33,864,578 35,523,943 37,832,999
1,096,560,146 1,172,880,732 1,217,332,912 1,269,921,694 1,332,147,857 1,418,737,467
1,710,633,828 1,829,693,942 1,899,039,342 1,981,077,842 2,078,150,656 2,213,230,449
1,315,872,175 1,407,456,878 1,460,799,494 1,523,906,032 1,598,577,428 1,702,484,961
731,040,097 781,920,488 811,555,275 846,614,462 888,098,571 945,824,978
219,312,029 234,576,146 243,466,582 253,984,339 266,429,571 283,747,493
438,624,058 469,152,293 486,933,165 507,968,677 532,859,143 567,494,987
1,169,664,156 1,251,072,781 1,298,488,439 1,354,583,140 1,420,957,714 1,513,319,965
0
HARGA DASAR SATUAN UPAH THD KENAIKAN INFLASI/TAHUN DENGAN UMK PR
Harga
No. Uraian Kode Satuan PU & BPS 2011 Inflasi 2012
( Rp.) 4.32%

1. Pekerja (L01) Jam 5,535.71 5,774.86


2. Tukang (L02) Jam 7,964.29 8,308.34
3. Mandor (L03) Jam 11,535.71 12,034.06
4. Operator (L04) Jam 21,535.71 22,466.06
5. Pembantu Operator (L05) Jam 10,821.43 11,288.91
6. Sopir / Driver (L06) Jam 8,821.43 9,202.51
7. Pembantu Sopir / Driver (L07) Jam 5,535.71 5,774.86
8. Mekanik (L08) Jam 14,392.86 15,014.63
9. Pembantu Mekanik (L09) Jam 7,250.00 7,563.20
10. Kepala Tukang (L10) Jam 10,821.43 11,288.91
11.
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Catatan : Upah sudah termasuk penambahan dari Analisa K3
DENGAN UMK PROV. NTB 2013
Harga Satuan Hrg Sat
Inflasi 2013 GUB NTB 2013 Rata-rata Dipakai
6.50% ( Rp.) ( Rp.) ( Rp.)

6,150.22 8,678.57 7,414.40 7,414.40 51,900.78


8,848.39 11,535.71 10,192.05 10,192.05
12,816.27 12,964.29 12,890.28 12,890.28
23,926.35 13,678.57 18,802.46 13,678.57
12,022.69 10,107.14 11,064.92 10,107.14
9,800.68 11,535.71 10,668.20 11,535.71
6,150.22 8,821.43 7,485.83 7,485.83
15,990.58 12,250.00 14,120.29 12,250.00
8,054.81 11,892.86 9,973.83 9,973.83
12,022.69 12,250.00 12,136.35 12,136.35
HARGA SATUAN DASAR TERHADAP INFLASI INDEKS HARGA KOMULATIF (IHK) P
Harga
No. Uraian Kode Satuan PU & BPS 2011 Inflasi 2012
( Rp.) 4.32%

1 Pasir Pasang (Sedang) M01b M3 87,545.45 91,327.42


2 Pasir Beton (Kasar) M01a M3 90,909.09 94,836.36
3 Pasir Halus (untuk HRS) M01c M3 104,545.45 109,061.82
4 Pasir Urug (ada unsur lempung) M01d M3 87,545.45 91,327.42
5 Batu Kali M02 M3 109,090.91 113,803.64
6 Agregat Kasar M03 M3 181,818.18 189,672.73
7 Agregat Halus M04 M3 227,272.73 237,090.91
8 Filler M05 Kg
9 Batu Belah / Kerakal M06 M3 136,363.64 142,254.55
10 Gravel M07 M3 136,363.64 142,254.55
11 Bahan Tanah Timbunan M08 M3 45,454.55 47,418.18
12 Bahan Pilihan M09 M3 68,181.82 71,127.27
13 Aspal M10 KG 6,545.45 6,828.22
14 Kerosen / Minyak Tanah M11 LITER 8,300.00 8,658.56
15 Semen / PC (50kg) M12 Zak 66,000.00 68,851.20
16 Semen / PC (kg) M12 Kg 1,320.00 1,377.02
17 Besi Beton M13 Kg 16,363.64 17,070.55
18 Kawat Beton M14 Kg 22,727.27 23,709.09
19 Kawat Bronjong 4mm M15 Kg 22,727.27 23,709.09
20 Sirtu M16 M3 88,636.36 92,465.45
21 Cat Marka (Non Thermoplas) M17a Kg 72,727.27 75,869.09
22 Cat Marka (Thermoplastic) M17b Kg 59,090.91 61,643.64
23 Paku M18 Kg 15,909.09 16,596.36
24 Kayu Perancah M19 M3 3,363,636.36 3,508,945.45
25 Bensin M20 LITER 7,650.00 7,980.48
26 Solar M21 LITER 9,500.00 9,910.40
27 Minyak Pelumas / Olie M22 LITER 19,090.91 19,915.64
28 Plastik Filter M23 M2 6,818.18 7,112.73
29 Pipa Galvanis Dia. 1.5" M24 Batang 90,909.09 94,836.36
30 Pipa Porus M25 M' -
31 Bahan Agr.Base Kelas A M26 M3 -
32 Bahan Agr.Base Kelas B M27 M3 -
33 Bahan Agr.Base Kelas C M28 M3 -
35 Geotextile M30 M2 15,454.55 16,122.18
36 Aspal Emulsi M31 Kg 11,000.00 11,475.20
37 Gebalan Rumput M32 M2 22,727.27 23,709.09
Pohon Sengon M32a Batang
38 Thinner M33 LITER 13,636.36 14,225.45
39 Glass Bead M34 Kg 35,454.55 36,986.18
40 Pelat Rambu (Eng. Grade) M35a BH 250,000.00 260,800.00
41 Pelat Rambu (High I. Grade) M35b BH -
42 Rel Pengaman M36 M' -
43 Beton K-250 M37 M3 -
Patok Beton K-175 M38 M3
44 Baja Tulangan (Polos) U24 M39a Kg 16,363.64 17,070.55
45 Baja Tulangan (Ulir) D32 M39b Kg 17,272.73 18,018.91
46 Kapur M40 M3 -
47 Chipping M41 M3 171,363.64 178,766.55
48 Chipping (kg) M41kg Kg 90.92 94.85
49 Cat Kayu M42 Kg 47,272.73 49,314.91
51 Pasir Urug M44 M3 87,545.45 91,327.42
53 Baja Bergelombang M46 Kg -
54 Beton K-125 M47 M3 -
56 Tiang Pancang Baja M49 M' -
58 Kawat Las M51 Dos 45,454.55 47,418.18
59 Pipa Baja M52 Kg 13,636.36 14,225.45
60 Minyak Fluks M53 Liter -
63 Baja Prategang M56 Kg 7,272.73 7,586.91
64 Baja Tulangan (Polos) U32 M57a Kg 10,000.00 10,432.00
65 Baja Tulangan (Ulir) D39 M39c Kg 7,727.27 8,061.09
66 Baja Tulangan (Ulir) D48 M39d Kg 7,727.27 8,061.09
73 Beton K-300 M59 M3 -
74 Beton K-175 M60 M3 -
76 Elastomer M62 buah 727,272.73 758,690.91
78 Mata Kucing M64 buah 68,181.82 71,127.27
79 Anchorage M65 buah -
80 Anti strpping agent M66 liter 60,909.09 63,540.36
82 Beton K-500 M68 M3 -
83 Beton K-400 M69 M3 -
86 Beton K-350 M72 M3 -
87 Multipleks 12 mm M73 Lbr 145,454.55 151,738.18
88 Elastomer jenis 1 M74a buah 436,363.64 455,214.55
89 Elastomer jenis 2 M74b buah 590,909.09 616,436.36
90 Elastomer jenis 3 M74c buah 727,272.73 758,690.91
91 Expansion Tipe Joint Asphaltic Plug M75d M 909,090.91 948,363.64
92 Expansion Join Tipe Rubber M75e M 1,090,909.09 1,138,036.36
93 Expansion Join Baja Siku M75f M 172,727.27 180,189.09
94 Marmer M76 Buah 90,909.09 94,836.36
96 Paving Block M78 Buah -
106 Batu Bara M88 Kg 545.45 569.02
107 Pipa Galvanis Dia 3" M24a M 22,727.27 23,709.09
108 Pipa Galvanis Dia 1,5" M24b M 22,727.27 23,709.09
109 Agregat Pecah Mesin 0-5 mm M91 M3 227,272.73 237,090.91
110 Agregat Pecah Mesin 5-10 & 10-20 mm M92 M3 181,818.18 189,672.73
111 Agregat Pecah Mesin 20-30 mm M93 M3 181,818.18 189,672.73
112 Joint Sealent M94 Kg 30,909.09 32,244.36
113 Cat Anti Karat / Cat Besi M95 Kg 68,181.82 71,127.27
116 Curing Compound M98 Ltr 54,545.45 56,901.82
117 Kayu Acuan M99 M3 3,363,636.36 3,508,945.45
118 Additive M67a Ltr 31,818.18 33,192.73
119 Casing M100 M -
120 Pasir Tailing M3 309,090.91 322,443.64
127 Aditif anti pengelupasan Kg 73,090.91 76,248.44
128 Bahan Pengisi (Filler) Tambahan Kg 1,320.00 1,377.02
RGA KOMULATIF (IHK) PERTAHUN DAN HARGA DAERAH
Harga Satuan Hrg Sat
Inflasi 2013 GUB NTB2013 Rata-rata Dipakai
4.90% ( Rp.) ( Rp.) ( Rp.)

95,802.46 133,333.33 114,567.90 114,567.90


99,483.35 145,833.33 122,658.34 122,658.34
114,405.85 133,333.33 123,869.59 123,869.59
95,802.46 61,791.67 78,797.06 61,791.67
119,380.01 134,166.67 126,773.34 126,773.34
198,966.69 225,000.00 211,983.35 211,983.35
248,708.36 318,750.00 283,729.18 283,729.18
2,500.00 2,500.00 2,500.00
149,225.02 112,500.00 130,862.51 112,500.00
149,225.02 150,000.00 149,612.51 149,612.51
49,741.67 75,000.00 62,370.84 62,370.84
74,612.51 95,833.33 85,222.92 85,222.92
7,162.80 10,727.27 8,945.04 10,727.27
9,082.83 9,082.83 9,082.83
72,224.91 55,000.00 63,612.45 63,612.45
1,444.50 1,100.00 1,272.25 1,272.25
17,907.00 21,500.00 19,703.50 21,500.00
24,870.84 25,000.00 24,935.42 25,000.00
24,870.84 25,000.00 24,935.42 25,000.00
96,996.26 89,583.33 93,289.80 89,583.33
79,586.68 61,772.73 70,679.70 61,772.73
64,664.17 78,860.00 71,762.09 71,762.09
17,409.59 18,000.00 17,704.79 18,000.00
3,680,883.78 1,950,000.00 2,815,441.89 1,950,000.00
8,371.52 8,371.52 8,371.52
10,396.01 10,396.01 10,665.25
20,891.50 19,500.00 20,195.75 19,500.00
7,461.25 7,461.25 7,461.25
99,483.35 391,620.00 245,551.67 391,620.00
- - - -
- - -
- - -
- - -
16,912.17 16,912.17 16,912.17
12,037.48 12,500.00 12,268.74 12,268.74
24,870.84 14,583.33 19,727.08 14,583.33
10,000.00 10,000.00 10,000.00
14,922.50 32,141.67 23,532.08 23,532.08
38,798.50 38,798.50 38,798.50
273,579.20 750,258.33 511,918.77 511,918.77
- 881,666.67 440,833.33 881,666.67
- 1,268,333.33 634,166.67 1,268,333.33
- - -

17,907.00 18,000.00 17,953.50 18,000.00


18,901.84 19,000.00 18,950.92 19,000.00
- 100,000.00 50,000.00 50,000.00
187,526.11 225,000.00 206,263.05 206,263.05
99.49 119.38 109.43 109.43
51,731.34 71,333.33 61,532.34 61,532.34
95,802.46 99,166.67 97,484.56 97,484.56
- -
- -
- -
49,741.67 30,000.00 39,870.84 30,000.00
14,922.50 14,922.50 14,922.50
2,750.00 2,750.00 2,750.00
7,958.67 7,958.67 7,958.67
10,943.17 18,000.00 14,471.58 18,000.00
8,456.08 19,000.00 13,728.04 19,000.00
8,456.08 19,000.00 13,728.04 19,000.00
- -
- -
795,866.76 795,866.76 795,866.76
74,612.51 74,612.51 74,612.51
- -
66,653.84 66,653.84 66,653.84
- -
- -
- -
159,173.35 202,000.00 180,586.68 202,000.00
477,520.06 477,520.06 477,520.06
646,641.75 646,641.75 646,641.75
795,866.76 795,866.76 795,866.76
994,833.45 994,833.45 994,833.45
1,193,800.15 1,193,800.15 1,193,800.15
189,018.36 189,018.36 189,018.36
99,483.35 270,710.00 185,096.67 270,710.00
2,310.00 2,310.00 2,310.00
596.90 596.90 596.90
24,870.84 82,690.00 53,780.42 82,690.00
24,870.84 41,345.00 33,107.92 41,345.00
248,708.36 318,750.00 283,729.18 283,729.18
198,966.69 230,833.33 214,900.01 214,900.01
198,966.69 230,833.33 214,900.01 214,900.01
33,824.34 33,824.34 33,824.34
74,612.51 27,500.00 51,056.25 27,500.00
59,690.01 59,690.01 59,690.01
3,680,883.78 1,625,000.00 2,652,941.89 1,625,000.00
34,819.17 34,819.17 34,819.17
- -
338,243.37 338,243.37 338,243.37
79,984.61 79,984.61 79,984.61
1,444.50 1,100.00 1,272.25 1,320.00
Harga Satuan
Gub. NTb 2013
PPN + OVERHEAD (20%)
Dompu (-20%) Bima (-20%)
160,000 133,333 160,000 133,333
175,000 145,833 175,000 145,833
160,000 133,333 160,000 133,333
74,150 61,792 74,150 61,792
161,000 134,167 161,000 134,167
270,000 225,000 270,000 225,000
382,500 318,750 382,500 318,750
3,000 2,500 3,000 2,500
135,000 112,500 135,000 112,500
180,000 150,000 180,000 150,000
90,000 75,000 74,150 61,792
115,000 95,833 98,000 81,667
10,727 10,727 10,727 10,727
- -
66,000 55,000 66,000 55,000
1,320 1,100 1,320 1,100
21,500 21,500 21,500 21,500
25,000 25,000 21,200 17,667
25,000 25,000 25,000 20,833
107,500 89,583 107,500 89,583
67,950 61,773 67,950 56,625
78,860 78,860 78,860 65,717
18,000 18,000 20,500 17,083
1,950,000 1,950,000 4,300,000 3,583,333
- -
- -
23,400 19,500 23,400 19,500
- -
391,620 391,620 65,270 54,392
- -
- -
- -
- -
- -
15,000 12,500 15,000 12,500
17,500 14,583 17,500 14,583

38,570 32,142 38,570 32,142


- -
900,310 750,258 796,940 664,117
1,058,000 881,667 1,058,000 881,667
1,522,000 1,268,333 1,522,000 1,268,333
- -

18,000 18,000 13,200 11,000


19,000 19,000 15,200 12,667
- -
270,000 225,000 270,000 225,000
- -
85,600 71,333 85,600 71,333
119,000 99,167 119,000 99,167
- -
- -
- -
30,000 30,000 30,000 25,000
- -
3,300 2,750 3,300 2,750
- -
18,000 18,000 18,000 18,000
19,000 19,000 19,000 19,000
19,000 19,000 19,000 19,000
- -
- -
- -
- -
- -
- -
- -
- -
- -
202,000 202,000 204,500 170,417
- -
- -
- -
- -
- -
- -
270,710 270,710 -
2,310 2,310 2,700 2,250
- -
82,690 82,690 186,060 155,050
41,345 41,345 65,270 54,392
382,500 318,750 382,500 318,750
277,000 230,833 277,000 230,833
277,000 230,833 277,000 230,833
- -
33,000 27,500 33,000 27,500
- -
1,950,000 1,625,000 4,300,000 3,583,333
- -
- -
- -
- -
1,320 1,100 1,320 1,100
- -
- -

- -
- -
JLN. Diponegoro No. 08 Kelurahan Monta Baru - Dompu
Dua Ratus Juta Rupiah
200,000,000.00
###
###

REKAPITULASI
DAFTAR KUANTITAS DAN HARGA

INSTANSI : DINAS PERTANIAN DAN PERKEBUNAN KABUPATEN DOMPU


KEGIATAN : PENGADAAN JALAN KHUSUS
PEKERJAAN : PEMBUATAN JALAN PRODUKSI DUSUN KALIAGA DESA KADINDI BARAT
T.A. : 2017
LOKASI : KEC. PEKAT KAB. DOMPU

Jumlah Harga
No. Divisi Uraian Pekerjaan
(Rupiah)

1 Umum 10,000,000.00
2 Drainase -
3 Pekerjaan Tanah 112,941,338.24
4 Pelebaran Perkerasan dan Bahu Jalan -
5 Pekerasan Berbutir -
6 Perkerasan Aspal -
7 Struktur 58,877,245.13
8 Pengembalian Kondisi dan Pekerjaan Minor -
9 Pekerjaan Harian -
10 Pekerjaan Pemeliharaan Rutin -

(A) Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) 181,818,583.37
(B) Pajak Pertambahan Nilai ( PPN ) = 10% x (A) 18,181,858.34
(C) JUMLAH TOTAL HARGA PEKERJAAN = (A) + (B) 200,000,441.70
(D) DIBULATKAN 200,000,000.00

Terbilang : Dua Ratus Juta Rupiah

Dompu, 2017
Disyahkan Oleh Diperiksa Oleh , Dibuat Oleh ,
Kepala Bidang Bina Marga Kasi Pengatur & Pembinaan CV. GRAHA TEKNIK CONSULTANT
Dinas PU. Dan Penata Ruang Bina Marga Dinas PU dan Penata Ruang
Kabupaten Dompu Kabupaten Dompu

SYAIFUDIN, ST DAVID, ST.MT MUH. JUNAIDIN,ST


NIP. 19750525 200501 1 006 NIP. 197911252003121004 Direktur

Mengetahui Oleh Disetujui Oleh


Kuasa Pengguna Anggaran ( KPA ) Pejabat Pembuat Komitmen ( PPK )
Dinas Pertanian dan Perkebunan Kepala Bidang Perkebunan
Kabupaten Dompu Dinas Pertanian dan Perkebunan Kab. Dmpu

Ir. MUHAMMAD ADIL ABDUL KHAIR, S.Hut


Pembina ( IV/a ) NIP. 1974 11 302000031 001
NIP. 196010151993031005
DAFTAR KUANTITAS DAN HARGA

INSTANSI : DINAS PERTANIAN DAN PERKEBUNAN KABUPATEN DOMPU


KEGIATAN : PENGADAAN JALAN KHUSUS
PEKERJAAN : PEMBUATAN JALAN PRODUKSI DUSUN KALIAGA DESA KADINDI BARAT
T.A. : 2017
LOKASI : KABUPATEN DOMPU PROV. NTB

No. Mata Uraian Satuan Perkiraan Harga Jumlah


Pembayaran Kuantitas Satuan Harga-Harga
(Rupiah) (Rupiah)
a b c d e f = (d x e)

DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 10,000,000.00 10,000,000.00

Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 10,000,000.00

DIVISI 2. DRAINASE
2.1 Galian untuk Selokan Drainase dan Saluran Air M3 - 47,753.68 -
2.2 Pasangan Batu dengan Mortar M3 - 582,194.79 -

Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) -

DIVISI 3. PEKERJAAN TANAH


3.1.1.a Galian Biasa M3 24.96 55,713.21 1,390,601.72
3.1.1.b Galian Batu Cadas Muda M3 - 104,923.00 -
3.1.3 Galian Struktur dengan kedalaman 0 - 2 meter M3 110,933.22 -
3.1.7 Galian Perkerasan Beraspal tanpa Cold Milling Machine M3 - 301,845.03 -
3.1.8 Galian Perkerasan berbutir M3 - 140,859.23 -
3.2.1 Timbunan Biasa ( Sirtu Gunung ) M3 805.95 133,728.07 107,778,138.02
3.2.2 Timbunan Pilihan ( Sirtu Kali ) M3 - 167,830.73 -
3.3 Penyiapan Badan Jalan M2 2,000.00 1,886.30 3,772,598.50
3.4.5 Pemotongan Pohon Pilihan diameter > 75 cm Pohon - 255,866.94 -

Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 112,941,338.24

DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN


4.2.1 Lapis Pondasi Agregat Kelas A M3 - 587,138.17 -
4.2.2 Lapis Pondasi Agregat Kelas B M3 - 461,080.30 -

Jumlah Harga Pekerjaan DIVISI 4 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) -

DIVISI 5. PERKERASAN BERBUTIR


5.1.1 Lapis Pondasi Agregat Kelas A M3 - 471,723.31 -
5.1.2 Lapis Pondasi Agregat Kelas B M3 - 422,326.40 -
5.2,1 Lapis Pondasi Agregat Kelas C M3 297,253.90 -

Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) -

DIVISI 6. PERKERASAN ASPAL


6.1 (1)(a) Lapis Resap Pengikat - Aspal Cair Liter - 12,047.42 -
6.1 (2)(a) Lapis Perekat - Aspal Cair Liter - 13,084.83 -
6.3(3a) Lataston Lapis Aus (HRS-WC) 5.0 cm (gradasi senjang/semi senjang) Ton - 484,177.49 -
6.3(3b) Lataston Lapis Aus Perata (HRS-WC(L)) (gradasi senjang/semi senjang) Ton - 484,177.49 -
6.3.4a Lataston Lapis Pondasi (HRS-Base) (gradasi senjang/semi senjang) Ton - 476,134.84 -
6.3.4b Lataston Lapis Pondasi Perata (HRS-Base(L)) (gradasi senjang/semi senjang) Ton - 473,747.10 -
6.3.8.a Aspal Keras Ton - 11,000,000.00 -
6.3.10a Bahan Pengisi (Filler) Tambahan (Semen) Kg - 1,437.48 -

Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) -
No. Mata Uraian Satuan Perkiraan Harga Jumlah
Pembayaran Kuantitas Satuan Harga-Harga
(Rupiah) (Rupiah)

DIVISI 7. STRUKTUR
7.1 (7) Beton mutu sedang dengan fc’= 20 MPa (K-250) M3 4.68 1,585,531.47 7,420,287.28
7.1 (8) Beton mutu rendah dengan fc’= 15 MPa (K-175) M3 - 1,283,052.66 -
7.1 (10) Beton mutu rendah dengan fc’= 10 MPa (K-125) M3 - 1,147,405.13 -
7.3 (1) Baja Tulangan BJ 24 Polos Kg 591.93 21,659.55 12,820,937.43
7.9 Pasangan Batu M3 53.77 718,478.71 38,636,020.42
7.10 (3) Bronjong M3 - 562,320.00 -
7.11 (6) Expansion Joint Tipe baja bersudut M1 - 304,838.01 -
7.12 (3) Perletakan Elastomer jenis 2 (350 x 400 x 39) Buah - 867,698.42 -
7.12 (6) Bog Jembatan Buah - 1,698,836.18 -
7.14 Papan Nama Jembatan Buah - 543,325.75 -
7.15 (8) Pembongkaran Jembatan Lama M2 - 189,043.21 -

Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 58,877,245.13

DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR


8.1 (1) Lapis Pondasi Agregat Kelas A utk Pekerjaan Minor M3 - 573,925.62 -
8.1 (2) Lapis Pondasi Agregat Kelas B utk Pekerjaan Minor M3 - 530,776.85 -
8.1 (5) Campuran Aspal Panas untuk Pekerjaan Minor M3 - 3,352,663.63 -
8.1 (9) Residu Bitumen untuk Pekerjaan Minor Liter - 13,102.47 -
8.4.(2) Marka Jalan Bukan Termoplastik M2 - 204,501.98 -
8.4.(3) .(a) Rambu Jalan Tunggal dengan Permukaan Pemantul Engineer Grade Buah 1,049,113.66 -
8.4.(6) .(a) Patok Kilometer Buah 671,230.88 -
8.4.(6) .(b) Patok Hektometer Buah 334,585.02 -
8.4.(12) Pengecetan Jembatan M2 - 68,876.83 -

Jumlah Harga Pekerjaan DIVISI 8 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) -
PERBANDINGAN HARGA SATUAN OE 2013 DENGAN OE 2012 SATKER PJN WIL 3 NTB
DENGAN MEMPERHATIKAN PERKIRAAN INFLASI 2013

HARGA RENCANA SELISIH


CEK OE 2013
VOLUME VOLUME EE 2013 OE 2013 OE APBNP OE 2013 HARGA HARGA SAT OE HARGA SAT OE
EE OE REGULER REGULER +/- +/- TA. 2012 DG INFLASI KONTRAK P-2012 VS 2013 DGN KONTRAK
P-2012 INFL 4.90%

1.00 1.00 150,860,000.00 10,000,000.00 CEK/Low OK 139,608,500.00 146,449,316.50

- 53,414.31 47,753.68 CEK/Low OK 52,428.76 54,997.77 60,161.31 (4,675.08) (12,407.63)


- 646,392.96 582,194.79 OK TINGGI 514,733.98 539,955.94 587,819.11 67,460.81 (5,624.32)

24.96 57,794.10 55,713.21 OK TINGGI 51,008.92 53,508.36 66,310.66 4,704.29 (10,597.45)


- 0.00 104,923.00 CEK/Low OK 209,198.45 219,449.17 147,939.43 (104,275.45) (43,016.43)
- 110,933.22 OK TINGGI 0.00 110,933.22 110,933.22
- 261,606.36 301,845.03 OK TINGGI 260,507.36 273,272.22 121,020.79 41,337.67 180,824.24
- 140,859.23 CEK/Low OK 156,358.60 164,020.17 89,544.77 (15,499.37) 51,314.46
805.95 153,944.23 133,728.07 CEK/Low OK 227,691.54 238,848.42 147,804.24 (93,963.47) (14,076.17)
- 182,748.24 167,830.73 CEK/Low OK 274,361.16 287,804.85 173,630.04 (106,530.43) (5,799.31)
2,000.00 1,959.62 1,886.30 OK TINGGI 1,144.66 1,200.75 1,020.54 741.64 865.76

- 617,304.13 461,080.30 CEK/Low OK 485,986.49 509,799.82 437,818.79 (24,906.19) 23,261.51

- 680,926.31 471,723.31 CEK/Low OK 528,073.80 553,949.42 509,350.99 (56,350.49) (37,627.68)


- 614,568.13 422,326.40 CEK/Low OK 481,659.62 505,260.94 452,381.48 (59,333.22) (30,055.08)

- 13,498.63 12,047.42 CEK/Low OK 13,134.96 13,778.57 11,752.55 (1,087.54) 294.87


- 14,396.06 13,084.83 CEK/Low OK 13,599.41 14,265.78 12,179.60 (514.58) 905.23
- 484,177.49 OK TINGGI 0.00 484,177.49 484,177.49
- 484,177.49 OK TINGGI 0.00 484,177.49 484,177.49
- 476,134.84 OK TINGGI 0.00 476,134.84 476,134.84
- 473,747.10 OK TINGGI 0.00 473,747.10 473,747.10
- 11,000,000.00 11,000,000.00 CEK/Low OK 11,121,000.35 11,665,929.36 14,000,000.00 (121,000.35) (3,000,000.00)
- 1,430.00 1,437.48 OK TINGGI 1,206.18 1,265.28 300.00 231.30 1,137.48
HARGA RENCANA SELISIH
CEK OE 2013
VOLUME VOLUME EE 2013 OE 2013 OE APBNP OE 2013 HARGA HARGA SAT OE HARGA SAT OE
EE OE REGULER REGULER +/- +/- TA. 2012 DG INFLASI KONTRAK P-2012 VS 2013 DGN KONTRAK
P-2012 INFL 4.90%

4.68 1,572,593.11 1,585,531.47 CEK/Low OK 2,433,026.57 2,552,244.87 2,205,968.62 (847,495.10) (620,437.15)


- 1,283,052.66 OK TINGGI 1,154,992.97 1,211,587.62 128,059.69 1,283,052.66
- 1,147,405.13 OK TINGGI 967,951.06 1,015,380.66 179,454.07 1,147,405.13
591.93 23,365.10 21,659.55 OK OK 21,550.71 22,606.70 14,535.92 108.84 7,123.63
53.77 648,172.08 718,478.71 OK TINGGI 619,191.38 649,531.76 604,324.03 99,287.33 114,154.68
- 562,320.00 OK TINGGI 500,000.00 524,500.00 619,993.24 62,320.00 (57,673.24)
0.00
0.00

0.00
0.00

- 654,438.77 573,925.62 OK TINGGI 520,506.89 546,011.73 620,552.88 53,418.73 (46,627.26)


- 530,776.85 OK TINGGI 0.00 530,776.85 530,776.85
- 3,558,837.82 3,352,663.63 CEK/Low OK 3,401,852.42 3,568,543.19 2,999,212.16 (49,188.80) 353,451.47
- 13,102.47 OK OK 12,751.14 13,375.94 15,619.18 351.33 (2,516.71)
- 204,501.98 OK TINGGI 0.00 204,501.98 204,501.98
- 697,841.58 1,049,113.66 OK TINGGI 640,567.69 671,955.51 646,922.05 408,545.97 402,191.61
- 736,470.46 671,230.88 OK TINGGI 639,254.37 670,577.83 617,762.24 31,976.52 53,468.64
- 0.00 334,585.02 OK OK 326,652.20 342,658.16 7,932.82 334,585.02
SELISIH HARGA
RANGE KESEPAKATAN HARGA
HARGA OE RATA2 SELISIH
APBNP dgn OE APBNP dgn MINIMAL MAKSIMAL VOL.
INFLASI 4,9% OE INFLASI

25,429,000.00 299,295,000.00 0.00

(2,569.01) 53,713.27 50,324.57 55,357.03 0.00


(25,221.96) 527,344.96 619,895.11 681,884.62 0.00

(2,499.44) 52,258.64 55,070.28 60,577.31 (24.96)


(10,250.72) 214,323.81 147,939.43 162,733.37 0.00
0.00 0.00
(12,764.86) 266,889.79 257,853.80 283,639.18 0.00
(7,661.57) 160,189.39 133,528.51 146,881.36 0.00
(11,156.89) 233,269.98 147,804.24 162,584.66 (805.95)
(13,443.70) 281,083.01 174,520.37 191,972.41 0.00
(56.09) 1,172.70 2,665.32 2,931.85 (2,000.00)

(23,813.34) 497,893.15 582,005.83 640,206.41 0.00

(25,875.62) 541,011.61 664,911.65 731,402.82 0.00


(23,601.32) 493,460.28 581,626.00 639,788.60 0.00

(643.61) 13,456.76 14,936.45 16,430.10 0.00


(666.37) 13,932.59 15,244.57 16,769.03 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
(544,929.02) 11,393,464.85 9,831,000.00 11,526,000.00 0.00
(59.10) 1,235.73 1,400.00 1,540.00 0.00
SELISIH HARGA
RANGE KESEPAKATAN HARGA
HARGA OE RATA2 SELISIH
APBNP dgn OE APBNP dgn MINIMAL MAKSIMAL VOL.
INFLASI 4,9% OE INFLASI

(119,218.30) 2,492,635.72 1,316,196.48 1,447,816.13 (4.68)


(56,594.66) 1,183,290.29 1,017,132.52 1,118,845.77 0.00
(47,429.60) 991,665.86 0.00
(1,055.99) 22,078.71 23,347.67 25,682.44 (591.93)
(30,340.38) 634,361.57 633,281.53 696,609.68 (53.77)
(24,500.00) 512,250.00 619,993.24 681,992.56 0.00

(25,504.84) 533,259.31 620,552.88 682,608.17 0.00


0.00 0.00 0.00
(166,690.77) 3,485,197.81 3,377,596.68 3,715,356.35 0.00
(624.81) 13,063.54 15,293.90 16,823.29 0.00
0.00 0.00 0.00
(31,387.82) 656,261.60 646,922.05 711,614.26 0.00
(31,323.46) 654,916.10 699,257.02 769,182.72 0.00
(16,005.96) 334,655.18 304,808.05 335,288.86 0.00
ESTIMASI VOLUME PEKERJAAN
INSTANSI : DINAS PERTANIAN DAN PERKEBUNAN KABUPATEN DOMPU
KEGIATAN :
PENGADAAN JALAN KHUSUS
PEKERJAAN : PEMBUATAN JALAN PRODUKSI DUSUN KALIAGA DESA KADINDI BARAT
ITEM PEKERJAAN : 3.1(1) Galian Biasa
SATUAN PEMB. : M³
TEAM PERENCANA : CV. GRAHA TEKNIK CONSULTANT

DIMENSI (M') LUAS LUAS PANJANG VOLUME


STATION L R KET.
A B C D E F G H M2 RATA2 M' M3
PEMBUATAN JALAN PRODUKSI DUSUN KALIAGA DESA KADINDI BARAT

00 + 000 L R 3.10 2.00 1.50 0.50 0.80 5.450 5.45

00 + 550 L R 2.00 0.80 0.80 0.40 0.60 2.080 2.08 6.00 12.48

02 + 500 L R 2.00 0.80 0.80 0.40 0.60 2.080 2.08 6.00 12.48

SUB.TOTAL 12.00 24.96


TOTAL KUMULATIF SEBELUMNYA - -
TOTAL 12.00 24.96

B E

Dibuat Oleh ,
CV. GRAHA TEKNIK CONSULTANT

MUH. JUNAIDIN,ST
Direktur
ESTIMASI VOLUME PEKERJAAN
INSTANSI : DINAS PERTANIAN DAN PERKEBUNAN KABUPATEN DOMPU
KEGIATAN :
PENGADAAN JALAN KHUSUS
PEKERJAAN : PEMBUATAN JALAN PRODUKSI DUSUN KALIAGA DESA KADINDI BARAT
ITEM PEKERJAAN : 3.1(1) Galian Biasa
SATUAN PEMB. : M³
TEAM PERENCANA : CV. GRAHA TEKNIK CONSULTANT

DIMENSI (M') LUAS LUAS PANJANG VOLUME


STATION L R KET.
A B C D E F G H M2 RATA2 M' M3
PEMBUATAN JALAN PRODUKSI DUSUN KALIAGA DESA KADINDI BARAT

00 + 150 L R 4.00 4.50 0.40 1.700


1.70 -
00 + 200 L R 4.00 4.50 0.40 1.700
1.70 -
00 + 250 L R 4.00 4.50 0.40 1.700

SUB.TOTAL - -
TOTAL KUMULATIF SEBELUMNYA - 24.96
TOTAL - 24.96

A
GAL IAN BIAS A ( P EMBUKAA N BADAN JALAN )
A
URUGAN BIASA ( SIRTU GUNUNG )
C /2

URUGAN BIAS A ( SIRTU GUNUNG )


C
L

Dibuat Oleh ,
CV. GRAHA TEKNIK CONSULTANT

MUH. JUNAIDIN,ST
Direktur
ESTIMASI VOLUME PEKERJAAN
INSTANSI : DINAS PERTANIAN DAN PERKEBUNAN KABUPATEN DOMPU
KEGIATAN :
PENGADAAN JALAN KHUSUS
PEKERJAAN : PEMBUATAN JALAN PRODUKSI DUSUN KALIAGA DESA KADINDI BARAT
ITEM PEKERJAAN : 3.1(1) Galian Biasa
SATUAN PEMB. : M³
TEAM PERENCANA : CV. GRAHA TEKNIK CONSULTANT

DIMENSI (M') LUAS LUAS PANJANG VOLUME


STATION L R KET.
A B C D E F G H M2 RATA2 M' M3
PEMBUATAN JALAN PRODUKSI DUSUN KALIAGA DESA KADINDI BARAT

00 + 000 L R - - -
- -
00 + 050 L R - - -
- -
00 + 100 L R - - -
- -
00 + 150 L R - - -
- -
00 + 200 L R - - -
- -
00 + 250 L R - - -
- -
00 + 300 L R - - -
- -
00 + 350 R R 2.40 - -
- -
00 + 400 R R 2.40 - -
- -
00 + 450 R R 2.40 - -
- -
00 + 500 R R 2.40 - -
- -
00 + 550 R R 2.40 - -
- -
00 + 600 R R 2.40 - -
- -
00 + 650 R R 2.40 - -
- -
00 + 700 R R 2.40 - -
- -
00 + 750 R R 2.40 - -
- -
00 + 800 R R 2.40 - -
- -
00 + 850 R R 2.40 - -
SUB.TOTAL - -
TOTAL KUMULATIF SEBELUMNYA - 24.96
TOTAL - 24.96

a 3.00 3.00 a

HRS-BASE, t = 5 Cm
LPA Klas A, t = 25 cm
TIMB. PILIHAN 20 CM LPA Klas B, t = 30 cm TIMB. PILIHAN 20 CM

- 4 % -2 % -2 % - 4 %

B
GA LIAN PELABARA BADAN JALAN

A
ESTIMASI VOLUME PEKERJAAN
INSTANSI : DINAS PERTANIAN DAN PERKEBUNAN KABUPATEN DOMPU
KEGIATAN :
PENGADAAN JALAN KHUSUS
PEKERJAAN : PEMBUATAN JALAN PRODUKSI DUSUN KALIAGA DESA KADINDI BARAT
ITEM PEKERJAAN : 3.1(1) Galian Biasa
SATUAN PEMB. : M³
TEAM PERENCANA : CV. GRAHA TEKNIK CONSULTANT

DIMENSI (M') LUAS LUAS PANJANG VOLUME


STATION L R KET.
A B C D E F G H M2 RATA2 M' M3
PEMBUATAN JALAN PRODUKSI DUSUN KALIAGA DESA KADINDI BARAT

00 + 850 R R 2.40 - -
- -
00 + 900 R R 2.40 - -
- -
00 + 950 R R 2.40 - -
- -
01 + 000 L R 1.20 - -
- -
01 + 050 L R 1.20 - -
- -
01 + 100 L R 1.20 - -
- -
01 + 150 L R 1.20 - -
- -
01 + 200 L R 1.20 - -
- -
01 + 250 L R 1.20 - -
- -
01 + 300 L R 1.20 - -
- -
01 + 350 L R 1.20 - -
- -
01 + 400 L R 1.20 - -
- -
01 + 450 L R 1.20 - -
- -
01 + 500 L R 1.20 - -
- -
01 + 550 L R 1.20 - -
- -
01 + 600 L R 1.20 - -
- -
01 + 650 L R 1.20 - -
- -
01 + 700 L R 1.20 - -
SUB.TOTAL - -
TOTAL KUMULATIF SEBELUMNYA - 24.96
TOTAL - 24.96

a 3.00 3.00 a

HRS-BASE, t = 5 Cm
LPA Klas A, t = 25 cm
TIMB. PILIHAN 20 CM LPA Klas B, t = 30 cm TIMB. PILIHAN 20 CM

- 4 % -2 % -2 % - 4 %

B
GALIAN PELABARA BADAN JALAN

A
ESTIMASI VOLUME PEKERJAAN
INSTANSI : DINAS PERTANIAN DAN PERKEBUNAN KABUPATEN DOMPU
KEGIATAN : PENGADAAN JALAN KHUSUS

PEKERJAAN : PEMBUATAN JALAN PRODUKSI DUSUN KALIAGA DESA KADINDI BARAT


ITEM PEKERJAAN : 3.2.(1) Timbunan Biasa
SATUAN PEMB. : M³
PERENCANA : CV. GRAHA TEKNIK CONSULTANT

DIMENSI (M') LUAS LUAS PANJANG VOLUME


STATION L/R KET.
A B C D M2 RATA2 M' M3
PEMBUATAN JALAN PRODUKSI DUSUN KALIAGA DESA KADINDI BARAT

00 + 000 L/R 4.50 0.30 1.35


1.35 50.00 67.50
00 + 050 L/R 4.50 0.30 1.35
1.35 50.00 67.50
00 + 100 L/R 4.50 0.30 1.35
1.35 50.00 67.50
00 + 150 L/R 4.50 0.30 1.35
1.35 50.00 67.50
00 + 200 L/R 4.50 0.30 1.35
1.35 50.00 67.50
00 + 250 L/R 4.50 0.30 1.35
1.35 50.00 67.50
00 + 300 L/R 4.50 0.30 1.35
1.35 50.00 67.50
00 + 350 L/R 4.50 0.30 1.35
1.35 50.00 67.50
00 + 400 L/R 4.50 0.30 1.35
1.35 37.00 49.95
00 + 437 L/R 4.50 0.30 1.35

00 + 000 L/R 4.50 0.30 1.35


1.35 50.00 67.50
00 + 050 L/R 4.50 0.30 1.35
1.35 50.00 67.50
00 + 100 L/R 4.50 0.30 1.35
1.35 50.00 67.50
00 + 150 L/R 4.50 0.30 1.35
1.35 10.00 13.50
00 + 160 L/R 4.50 0.30 1.35

SUB.TOTAL 597.00 805.95


TOTAL KUMULATIF SEBELUMNYA - -
TOTAL 597.00 805.95

URUGAN BIASA ( SIRTU GUNUNG ) URUGAN BIASA ( SIRTU GUNUNG )


CL

Dibuat Oleh ,
CV. GRAHA TEKNIK CONSULTANT

MUH. JUNAIDIN,ST
Direktur
ESTIMASI VOLUME PEKERJAAN
INSTANSI : DINAS PERTANIAN DAN PERKEBUNAN KABUPATEN DOMPU
KEGIATAN :
PENGADAAN JALAN KHUSUS
PEKERJAAN : PEMBUATAN JALAN PRODUKSI DUSUN KALIAGA DESA KADINDI BARAT
ITEM PEKERJAAN : 3.3 Penyiapan Badan Jalan
SATUAN PEMB. : M³
PERENCANA : CV. GRAHA TEKNIK CONSULTANT

LEBAR LEBAR PANJANG VOLUME


STATION L/R LEBAR (L) LEBAR (R) KET.
M1 RATA2 M' M2
PEMBUATAN JALAN PRODUKSI DUSUN KALIAGA DESA KADINDI BARAT

00 + 000 L/R 2.00 2.00 4.00


4.00 50.00 200.00
00 + 050 L/R 2.00 2.00 4.00
4.00 50.00 200.00
00 + 100 L/R 2.00 2.00 4.00
4.00 50.00 200.00
00 + 150 L/R 2.00 2.00 4.00
4.00 50.00 200.00
00 + 200 L/R 2.00 2.00 4.00
4.00 50.00 200.00
00 + 250 L/R 2.00 2.00 4.00
4.00 50.00 200.00
00 + 300 L/R 2.00 2.00 4.00
4.00 50.00 200.00
00 + 350 L/R 2.00 2.00 4.00
4.00 50.00 200.00
00 + 400 L/R 2.00 2.00 4.00
4.00 50.00 200.00
00 + 450 L/R 2.00 2.00 4.00
4.00 50.00 200.00
00 + 500 L/R 2.00 2.00 4.00

SUB.TOTAL 500.00 2,000.00


TOTAL KUMULATIF SEBELUMNYA - -
TOTAL 500.00 2,000.00

a 1.75 1,75 a

HRS-BASE, t = 5 Cm
LPA Klas A, t = 25 cm
TIMB. PILIHAN 15 CM TIMB. PILIHAN 15 CM

-4 % -2 % -2 % - 4 %
ESTIMASI VOLUME PEKERJAAN
INSTANSI : DINAS PERTANIAN DAN PERKEBUNAN KABUPATEN DOMPU
KEGIATAN :
PENGADAAN JALAN KHUSUS
PEKERJAAN : PEMBUATAN JALAN PRODUKSI DUSUN KALIAGA DESA KADINDI BARAT
ITEM PEKERJAAN : 3.3 Penyiapan Badan Jalan
SATUAN PEMB. : M³
PERENCANA : CV. GRAHA TEKNIK CONSULTANT

LEBAR LEBAR PANJANG VOLUME


STATION L/R LEBAR (L) LEBAR (R) KET.
M1 RATA2 M' M2
PEMBUATAN JALAN PRODUKSI DUSUN KALIAGA DESA KADINDI BARAT

00 + 000 L/R - - -
- -
00 + 050 L/R - - -
- -
00 + 100 L/R - - -
- -
00 + 150 L/R - - -
- -
00 + 200 L/R - - -
- -
00 + 250 L/R - - -
- -
00 + 300 L/R - - -
- -
00 + 350 L/R - - -
- -
00 + 400 L/R - - -
- -
00 + 450 L/R - - -
- -
00 + 500 L/R - - -
- -
00 + 550 L/R - - -
- -
00 + 600 L/R - - -
- -
00 + 650 L/R - - -
- -
00 + 700 L/R - - -
- -
00 + 750 L/R - - -
- -
00 + 800 L/R - - -
- -
00 + 850 L/R - - -
SUB.TOTAL - -
TOTAL KUMULATIF SEBELUMNYA 500.00 2,000.00
TOTAL 500.00 2,000.00

a 1.75 1,75 a

HRS-BASE, t = 5 Cm
LPA Klas A, t = 25 cm
TIMB. PILIHAN 15 CM TIMB. PILIHAN 15 CM

- 4 % -2 % -2 % - 4 %
ESTIMASI VOLUME PEKERJAAN
INSTANSI : DINAS PERTANIAN DAN PERKEBUNAN KABUPATEN DOMPU
KEGIATAN :
PENGADAAN JALAN KHUSUS
PEKERJAAN : PEMBUATAN JALAN PRODUKSI DUSUN KALIAGA DESA KADINDI BARAT
ITEM PEKERJAAN : 3.3 Penyiapan Badan Jalan
SATUAN PEMB. : M³
PERENCANA : CV. GRAHA TEKNIK CONSULTANT

LEBAR LEBAR PANJANG VOLUME


STATION L/R LEBAR (L) LEBAR (R) KET.
M1 RATA2 M' M2
PEMBUATAN JALAN PRODUKSI DUSUN KALIAGA DESA KADINDI BARAT

00 + 850 L/R - - -
- -
00 + 900 L/R - - -
- -
00 + 950 L/R - - -
- -
01 + 000 L/R - - -
- -
01 + 050 L/R - - -
- -
01 + 100 L/R - - -
- -
01 + 150 L/R - - -
- -
01 + 200 L/R - - -
- -
01 + 250 L/R - - -
- -
01 + 300 L/R - - -
- -
01 + 350 L/R - - -
- -
01 + 400 L/R - - -
- -
01 + 450 L/R - - -
- -
01 + 500 L/R - - -
- -
01 + 550 L/R - - -
- -
01 + 600 L/R - - -
- -
01 + 650 L/R - - -
- -
01 + 700 L/R - - -
SUB.TOTAL - -
TOTAL KUMULATIF SEBELUMNYA 500.00 2,000.00
TOTAL 500.00 2,000.00

a 1.75 1,75 a

HRS-BASE, t = 5 Cm
LPA Klas A, t = 25 cm
TIMB. PILIHAN 15 CM TIMB. PILIHAN 15 CM

- 4 % -2 % -2 % -4 %
ESTIMASI VOLUME PEKERJAAN
INSTANSI : DINAS PERTANIAN DAN PERKEBUNAN KABUPATEN DOMPU
KEGIATAN :
PENGADAAN JALAN KHUSUS
PEKERJAAN : PEMBUATAN JALAN PRODUKSI DUSUN KALIAGA DESA KADINDI BARAT
ITEM PEKERJAAN : 3.3 Penyiapan Badan Jalan
SATUAN PEMB. : M³
PERENCANA : CV. GRAHA TEKNIK CONSULTANT

LEBAR LEBAR PANJANG VOLUME


STATION L/R LEBAR (L) LEBAR (R) KET.
M1 RATA2 M' M2
PEMBUATAN JALAN PRODUKSI DUSUN KALIAGA DESA KADINDI BARAT

01 + 700 L/R - - -
- -
01 + 750 L/R - - -
- -
01 + 800 L/R - - -
- -
01 + 850 L/R - - -
- -
01 + 900 L/R - - -
- -
01 + 950 L/R - - -
- -
02 + 000 L/R - - -
- -
02 + 050 L/R - - -
- -
02 + 100 L/R - - -
- -
02 + 150 L/R - - -
- -
02 + 200 L/R - - -
- -
02 + 250 L/R - - -
- -
02 + 300 L/R - - -
- -
02 + 350 L/R - - -
- -
02 + 400 L/R - - -
- -
02 + 450 L/R - - -
- -
02 + 500 L/R - - -
- -
02 + 550 L/R - - -
SUB.TOTAL - -
TOTAL KUMULATIF SEBELUMNYA 500.00 2,000.00
TOTAL 500.00 2,000.00

a 3.00 3.00 a

HRS-BASE, t = 5 Cm
LPA Klas A, t = 25 cm
TIMB. PILIHAN 20 CM LPA Klas B, t = 30 cm TIMB. PILIHAN 20 CM

-4 % -2 % -2 % - 4 %

B
GALIAN PELABARA BADAN JALAN

A
ESTIMASI VOLUME PEKERJAAN
INSTANSI : DINAS PERTANIAN DAN PERKEBUNAN KABUPATEN DOMPU
KEGIATAN :
PENGADAAN JALAN KHUSUS
PEKERJAAN : PEMBUATAN JALAN PRODUKSI DUSUN KALIAGA DESA KADINDI BARAT
ITEM PEKERJAAN : 3.3 Penyiapan Badan Jalan
SATUAN PEMB. : M³
PERENCANA : CV. GRAHA TEKNIK CONSULTANT

LEBAR LEBAR PANJANG VOLUME


STATION L/R LEBAR (L) LEBAR (R) KET.
M1 RATA2 M' M2
PEMBUATAN JALAN PRODUKSI DUSUN KALIAGA DESA KADINDI BARAT

02 + 550 L/R - - -
- -
02 + 600 L/R - - -
- -
02 + 650 L/R - - -
- -
02 + 700 L/R - - -
- -
02 + 750 L/R - - -
- -
02 + 800 L/R - - -
- -
02 + 850 L/R - - -
- -
02 + 900 L/R - - -
- -
02 + 950 L/R - - -

SUB.TOTAL - -
TOTAL KUMULATIF SEBELUMNYA 500.00 2,000.00
TOTAL 500.00 2,000.00

a 3.00 3.00 a

HRS-BASE, t = 5 Cm
LPA Klas A, t = 25 cm
TIMB. PILIHAN 20 CM LPA Klas B, t = 30 cm TIMB. PILIHAN 20 CM

-4 % -2 % -2 % - 4 %

B
GALIAN PELABARA BADAN JALAN

A
ESTIMASI VOLUME PEKERJAAN
INSTANSI : DINAS PERTANIAN DAN PERKEBUNAN KABUPATEN DOMPU
KEGIATAN :
PENGADAAN JALAN KHUSUS
PEKERJAAN : PEMBUATAN JALAN PRODUKSI DUSUN KALIAGA DESA KADINDI BARAT
ITEM PEKERJAAN : 3.3 Penyiapan Badan Jalan
SATUAN PEMB. : M³
PERENCANA : CV. GRAHA TEKNIK CONSULTANT

LEBAR LEBAR PANJANG VOLUME


STATION L/R LEBAR (L) LEBAR (R) KET.
M1 RATA2 M' M2
PEMBUATAN JALAN PRODUKSI DUSUN KALIAGA DESA KADINDI BARAT

00 + 000 L/R - - -
- -
00 + 050 L/R - - -
- -
00 + 100 L/R - - -
- -
00 + 150 L/R - - -
- -
00 + 200 L/R - - -
- -
00 + 250 L/R - - -

SUB.TOTAL - -
TOTAL KUMULATIF SEBELUMNYA 500.00 2,000.00
TOTAL 500.00 2,000.00

a 3.00 3.00 a

HRS-BASE, t = 5 Cm
LPA Klas A, t = 25 cm
TIMB. PILIHAN 20 CM LPA Klas B, t = 30 cm TIMB. PILIHAN 20 CM

-4 % -2 % -2 % - 4 %

B
GALIAN PELABARA BADAN JALAN

A
ESTIMASI VOLUME PEKERJAAN
INSTANSI : DINAS PERTANIAN DAN PERKEBUNAN KABUPATEN DOMPU
KEGIATAN :
PENGADAAN JALAN KHUSUS
PEKERJAAN : PEMBUATAN JALAN PRODUKSI DUSUN KALIAGA DESA KADINDI BARAT
ITEM PEKERJAAN : 7.1.(7) Beton Mutu Sedang Dengan fc' = 20 Mpa (K-250)
SATUAN PEMB. : M³
PERENCANA : CV. GRAHA TEKNIK CONSULTANT

DIMENSI (M') LUAS LUAS PANJANG VOLUME


STATION L/R KET.
A B C D M 2
RATA 2
M' M3
PEMBUATAN JALAN PRODUKSI DUSUN KALIAGA DESA KADINDI BARAT

PLAT

00 + 200.00 L/R 1.30 0.20 0.26 0.26 6.00 1.56 JALAN I

00 + 350.00 L/R 1.30 0.20 0.26 0.26 6.00 1.56 JALAN I

00 + 160.00 L/R 1.30 0.20 0.26 0.26 6.00 1.56 JALAN II

SUB.TOTAL 18.00 4.68


TOTAL KUMULATIF SEBELUMNYA - -
TOTAL 18.00 4.68

B )I(
P
A

Dibuat Oleh ,
CV. GRAHA TEKNIK CONSULTANT

MUH. JUNAIDIN,ST
Direktur
ESTIMASI VOLUME PEKERJAAN
INSTANSI : DINAS PERTANIAN DAN PERKEBUNAN KABUPATEN DOMPU
KEGIATAN : PENGADAAN JALAN KHUSUS

PEKERJAAN : PEMBUATAN JALAN PRODUKSI DUSUN KALIAGA DESA KADINDI BARAT


ITEM PEKERJAAN : 7.2 Baja Tulangan
SATUAN PEMB. : Kg
PERENCANA : CV. GRAHA TEKNIK CONSULTANT

PEMBUATAN JALAN PRODUKSI DUSUN KALIAGA DESA KADINDI BARAT

PANJANG 6.00 Meter STATION POSISI KET.


LEBAR PLAT 1.30 Meter STA. 00 + 200.00 L/R JALAN I
TEBAL PLAT 0.20 Meter STA. 00 + 350.00 L/R JALAN I
TEBAL SELIMUT BETON 0.025 Meter STA. 00 + 160.00 L/R JALAN II
JARAK TUL. PLAT MELINTANG 0.15 Meter
JARAK TUL. PLAT MEMANJANG 0.15 Meter
DIAMETER TUL. PLAT MELINTANG 12.00 Diameter
DIAMETER TUL. PLAT MEMANJANG 12.00 Diameter
DIAMETER SENGKANG BANTALAN - Diameter
DIAMETER TUL. BANTALAN - Diameter
JARAK TUL. SENGKANG BANTALAN - Meter

DIMENSI (M') PJG JMLH TOTAL PJG VOL.


JMLH GORONG2 KET.
A B C D E F G TIAP TUL. TUL. PJG M' / KG KG

1 0.025 0.15 1.25 0.15 0.025 1.60 21 33.60 0.887 29.82 Tul. Melintang
2 0.025 1.25 0.025 1.30 21 27.30 0.887 24.23 Tul. Melintang
3 0.025 0.15 0.24 0.21 0.775 2.02 21 42.51 0.887 37.72 Tul. Melintang
3.00 4 0.025 0.15 5.95 0.15 0.025 6.30 10 60.92 0.887 54.06 Tul. Memanjang
5 0.025 5.95 0.025 6.00 10 58.02 0.887 51.49 Tul. Memanjang

JUMLAH 197.31
SUB.TOTAL 591.93
TOTAL KUMULATIF SEBELUMNYA -
TOTAL 591.93

C C
1, B D 4, B D
A E C C A E
3, B
D
E
D B
A A

A C
2, A B C 5, B

Dibuat Oleh ,
CV. GRAHA TEKNIK CONSULTANT

MUH. JUNAIDIN,ST
Direktur
ESTIMASI VOLUME PEKERJAAN
INSTANSI : DINAS PERTANIAN DAN PERKEBUNAN KABUPATEN DOMPU
KEGIATAN :
PENGADAAN JALAN KHUSUS
PEKERJAAN : PEMBUATAN JALAN PRODUKSI DUSUN KALIAGA DESA KADINDI BARAT
ITEM PEKERJAAN : 7.2 Baja Tulangan
SATUAN PEMB. : Kg
PERENCANA : CV. GRAHA TEKNIK CONSULTANT

PEMBUATAN JALAN PRODUKSI DUSUN KALIAGA DESA KADINDI BARAT

PANJANG 6.00 Meter STATION POSISI KET.


LEBAR PLAT 1.30 Meter STA. 00 + 200.00 L/R JALAN I
TEBAL PLAT 0.20 Meter 00 + 000.00 L/R JALAN I
TEBAL SELIMUT BETON 0.025 Meter
JARAK TUL. PLAT MELINTANG 0.20 Meter
JARAK TUL. PLAT MEMANJANG 0.20 Meter
DIAMETER TUL. PLAT MELINTANG 16.00 Diameter
DIAMETER TUL. PLAT MEMANJANG 12.00 Diameter
DIAMETER SENGKANG BANTALAN 10.00 Diameter
DIAMETER TUL. BANTALAN 12.00 Diameter
JARAK TUL. SENGKANG BANTALAN 0.25 Meter

DIMENSI (M') PJG JMLH TOTAL PJG VOL.


JMLH GORONG2 KET.
A B C D E F G TIAP TUL. TUL. PJG M' / KG KG

1 0.15 0.15 0.15 0.15 0.05 0.65 16 10.40 0.616 6.41 Sengkang Bantalan

2 0.05 5.95 0.05 6.05 16 96.80 0.887 85.90 Tul. Bantalan

3 0.05 0.15 1.25 0.15 0.05 1.65 16 26.40 1.578 41.65 Tul. Melintang

0.00 4 0.05 1.25 0.05 1.35 16 21.60 1.578 34.08 Tul. Melintang

5 0.05 0.15 0.24 0.21 0.78 2.07 4 8.82 1.578 13.91 Tul. Melintang

6 0.05 0.15 5.95 0.15 0.05 6.35 4 26.99 0.887 23.95 Tul. Memanjang

7 0.05 5.95 0.05 6.05 8 45.38 0.887 40.27 Tul. Memanjang

JUMLAH 246.16
SUB.TOTAL -
TOTAL KUMULATIF SEBELUMNYA 591.93
TOTAL 591.93

A C
3, B D 6, C
1, B E D A E B D
A E
C
4, A B C 7, A B C

2, A B C C
D
C
5, B
A
E
D
A
B
ESTIMASI VOLUME PEKERJAAN

INSTANSI : DINAS PERTANIAN DAN PERKEBUNAN KABUPATEN DOMPU


KEGIATAN :
PENGADAAN JALAN KHUSUS
PEKERJAAN : PEMBUATAN JALAN PRODUKSI DUSUN KALIAGA DESA KADINDI BARAT
ITEM PEKERJAAN : 7.9 Pasangan Batu
SATUAN PEMB. : M³
PERENCANA : CV. GRAHA TEKNIK CONSULTANT

DIMENSI (M') LUAS PANJANG VOLUME


STATION L/R KET.
A B C D E F a; b' c' M2 M' M3
PEMBUATAN JALAN PRODUKSI DUSUN KALIAGA DESA KADINDI BARAT

GORONG - GORONG

00 + 200 L/R 0.48 0.60 0.80 0.20 0.30 0.80 0.20 0.28 0.45 1.840 6.00 11.04

00 + 350 L/R 0.48 0.60 0.80 0.20 0.30 0.80 0.20 0.28 0.45 1.840 6.00 11.04

00 + 160 L/R 0.48 0.60 0.80 0.20 0.30 0.80 0.20 0.28 0.45 1.840 6.00 11.04

SUB.TOTAL 18.00 33.12


TOTAL KUMULATIF SEBELUMNYA - -
TOTAL 18.00 33.12

a'

c'

b'

D
E

B F

Dibuat Oleh ,
CV. GRAHA TEKNIK CONSULTANT

MUH. JUNAIDIN,ST
Direktur
ESTIMASI VOLUME PEKERJAAN

INSTANSI : DINAS PERTANIAN DAN PERKEBUNAN KABUPATEN DOMPU


KEGIATAN :
PENGADAAN JALAN KHUSUS
PEKERJAAN : PEMBUATAN JALAN PRODUKSI DUSUN KALIAGA DESA KADINDI BARAT
ITEM PEKERJAAN : 7.9 Pasangan Batu
SATUAN PEMB. : M³
PERENCANA : CV. GRAHA TEKNIK CONSULTANT

DIMENSI (M') LUAS LUAS PANJANG VOLUME


STATION L/R KET.
A B C D E F G H M 2
RATA 2
M' M3
PEMBUATAN JALAN PRODUKSI DUSUN KALIAGA DESA KADINDI BARAT

00 + 200 L/R 0.30 0.40 0.70 0.30 0.365


0.37 10.00 7.30
00 + 210 L/R 0.30 0.40 0.70 0.30 0.365

00 + 160 L/R 0.30 0.40 0.70 0.30 0.365


0.37 10.00 7.30
00 + 170 L/R 0.30 0.40 0.70 0.30 0.365

00 + 160 L/R 0.30 0.40 0.70 0.30 0.365


0.38 8.00 6.05
00 + 168 L/R 0.30 0.40 0.78 0.30 0.392

SUB.TOTAL 28.00 20.65


TOTAL KUMULATIF SEBELUMNYA 18.00 33.12
TOTAL 46.00 53.77
a

Dibuat Oleh ,
CV. GRAHA TEKNIK CONSULTANT

MUH. JUNAIDIN,ST
Direktur