UPAH
KABUPATEN PUHUWATO GORONTALO. DAN MATERIAL.
PRIODE : PEB.2018
Jumlah Hari & PPN Upah
NO Peralatan / Pekerja
Orang JAM 1.1 '(Rp/Org/Hr)
PERALATAN :
1 BULDOSER 110 HP 1.00 jam 389,900.00
PEKERJA :
MATERIAL :
BATU :
1 Batu Bata merah Press Mesin 1.00 bh 499.60
2 Batu Bata merah uk.20x9,5x4 cm uk.kecil
Proses tangan. 1.00 bh 611.00
3 batu pecah (3-5 Cm) 1.00 m3 308,000.00
4 batu pecah (2-3 Cm) 1.00 m 3
330,000.00
5 batu pecah (1-2 Cm) 1.00 m 3
341,000.00
6 Batu pecah 1/3 1.00 m 3
341,000.00
7 Batu Belah 1.00 m3 225,000.00
8 Koral Beton 1.00 m 3
168,320.00
9 Sirtu 1.00 m 3
237,800.00
PASIR :
1 Pasir Urug 1.00 m3 160,700.00
2 Pasir Pasang 1.00 m 3
106,050.00
3 Pasir Cor / Pasir beton 1.00 m 3
215,300.00
4 Pasir Ayak Untuk Beton 1.00 m3 282,145.00
5 Kerikil 1.00 m 3
250,000.00
6 Air 1.00 Ltr 25.00
7 Minyak Bekisting 1.00 Ltr 2,500.00
BEKISTING :
1 Multiplek fenol film 15 mm 1.00 Lbr 315,000.00
2 Multiplek 9 mm 1.00 Lbr 125,000.00
3 Minyak bekesting 1.00 Ltr 3,500.00
4 Kayu bekesting 1.00 m3 1,750,000.00
5 Schafolding 1.00 25,000.00
6 Plywood t. 6 mm 1.00 Lbr 65,000.00
7 Plywood t. 9 mm 1.00 Lbr 115,000.00
CAT :
1 Cat tembok Cathylac 1.00 kg 25,000.00
2 Cat Kayu Emco 1.00 kg 50,000.00
3 Dempul/Plamur 1.00 kg 12,500.00
4 Minyak cat 1.00 kg 7,500.00
5 Kertas gosok / ampelas 1.00 lbr 3,500.00
6 Minyak cat 1.00 kg 7,500.00
7 Meni besi 1.00 kg 22,500.00
8 Plamur tembok 1.00 kg 8,500.00
9 Sabun 1.00 bh 5,000.00
10 Cat dasar 1.00 kg 25,000.00
11 Cat penutup 1.00 kg 30,500.00
12 Dempul kayu 1.00 kg 15,000.00
13 Kuas 1.00 bh 7,500.00
14 Perekat 1.00 kg 18,500.00
15 Wall paper 1.00 m2 35,000.00
16 Pengecatan Konst.Baja 1.00 kg 1,000.00
17 Cat penutup 1.00 kg 30,500.00
LANTAI :
1 Keramik Roman KW 1 1.00 m2 50,000.00
2 Keramik 10 x 20 cm Ex.Roman 1.00 bh 1,200.00
3 Keramik 20 x 20 cm Ex.Roman. 1.00 bh 45,000.00
4 Keramik 25 x 25 cm Ex.Roman 1.00 bh 2,250.00
5 Keramik 33,3 x 33,3 cm Ex.Roman 1.00 bh 8,000.00
6 Keramik 30 x 30 cm Ex Roman 1.00 bh 50,000.00
7 Keramik 20 x 25 cm Ex Roman 1.00 bh 3,000.00
8 Keramik 45 x 45 cm Ex Roman 1.00 bh 20,875.00
9 Keramik Essenza 30x30 ( Unpolish ) Colour 1.00 bh 17,500.00
10 Keramik Essenza 30x60 ( Unpolish ) Colour 1.00 bh 32,083.33
11 Keramik Essenza 40x40 ( Unpolish ) Colour 1.00 bh 32,083.33
12 Keramik Essenza 60x60 ( Unpolish ) Colour 1.00 bh 64,166.67
13 Granito 30x30 ( Unpolish ) Colour 1.00 bh 12,323.27
14 Granito 30x30 ( Polished ) Colour 1.00 bh 14,747.45
15 Granito 40x40 ( Unpolish ) Colour 1.00 bh 14,464.00
NURDIN IBRAHIM Harga Peralatan Dan material 3
301160017
16 Granito 40x40 ( Polished ) Colour 1.00 bh 16,875.00
17 Granito 60x60 ( Unpolish ) Colour 1.00 bh 97,268.50
18 Granito 60x60 ( Polished ) Colour 1.00 bh
SEMEN :
1 Semen Tiga Roda / 50 Kg 1.00 kg 68,100.00
2 Semen Putih Tiga Roda / 40 Kg 1.00 kg 87,315.00
3 Semen Warna 1.00 kg 1,700.00
4 Semen putih 1.00 kg 1,700.00
5 Beton Instan k225 1.00 sak 35,000.00
6 Bounding Agent 1.00 ltr 54,000.00
KAYU.
1 Dolken kayu dia. 8 - 400 cm 1.00 btg 25,000.00
2 Kayu meranti 5/7 MB 1.00 m3 2,500,000.00
3 Papan kayu meranti 3/30 MB 1.00 m3 2,650,000.00
4 Kayu ulin 10/10-400 1.00 m 3
1,200,000.00
5 Kayu Bangkirai 1.00 m 3
1,800,000.00
6 Papan Kayu Bangkirai 1.00 m3 1,850,000.00
7 List kayu profil 1.00 m 1
2,500.00
8 Balok 8/15 & 6/15 ( Kayu borneo ) 1.00 m 1
1,850,000.00
9 Kayu Profil 1.00 m1 5,000.00
10 Papan Ulin 1.00 m 3
1,500,000.00
11 Kayu Ulin 1.00 m3 2,000,000.00
12 kayu borneo balok 1.00 m3 1,800,000.00
13 Papan Cor 2/20 1.00 m3 950,000.00
14 Papan 3/30 x 4m Kamper Samarinda Oven 1.00 m 3
9,150,000.00
15 Balok 6/12x 4 m Kamper Medan 1.00 m 3
6,500,000.00
16 Papan 3/30 x 4m Kamper Medan 1.00 m3 6,500,000.00
17 Balok 6/12x 4 m Bangkirai 1.00 m 3
3,650,000.00
18 Papan 3/30 x 4m Bangkirai 1.00 m 3
3,650,000.00
19 Plywood t = 4 mm 1.00 Lbr 65,000.00
ATAP.
LAIN - LAIN.
1 Bak teraso 1.00 bh 210,000.00
2 Kunci tanam 1.00 bh 65,000.00
3 Door closer 1.00 bh 350,000.00
4 Rel pintu dorong 1.00 bh 175,000.00
5 Door stop 1.00 bh 27,500.00
6 Kait angin 1.00 bh 12,500.00
7 Engsel pintu 1.00 bh 8,500.00
8 Kunci Slot 1.00 bh 7,500.00
9 Waterstop lebar 150 mm 1.00 m1 65,000.00
10 Lem Vinyl 1.00 kg 14,500.00
11 Paku payung 1.00 m2 17,500.00
12 Kain Sintetis 1.00 m2 35,000.00
13 Waterproofing 1.00 m2 32,500.00
14 Self aditive membrane 1.00 m 2
37,500.00
NURDIN IBRAHIM Harga Peralatan Dan material 7
301160017
15 Clementitious ( bahan additive ) 1.00 m2 37,500.00
16 Papan Nama Proyek ( Uk.1 x 2 m ) + Pondasi 1.00 bh 500,000.00
17 Fleece Tape 1.00 m' 15,000.00
18 Waterproofing with Ultraflex Membrane 1.00 kg 65,000.00
19 Sealant 1.00 m' 13,000.00
SANITAIR.
1 kloset duduk/monoblok Toto Type CW.660J/SW660J 1.00 unit 3,400,000.00
2 kloset jongkok Toto Type CE.6 1.00 unit 505,000.00
3 Urinoir Toto Type U.57 M. 1.00 unit 2,500,000.00
4 Kran dinding Toto Type T.23 B.13 1.00 unit 247,000.00
5 floor drain Toto Type TX 1 BN. 1.00 unit 425,000.00
6 Wastafel Toto Type L.521 V1A 1.00 unit 1,732,000.00
7 Kran Taman Toto Type T.26-13 1.00 unit 334,000.00
8 Kran Kitchen Sink Toto Type T.30 AR.13 V7N. 1.00 unit 408,000.00
9 Penyekat Urinoi Toto Type A.100. 1.00 unit 1,240,000.00
10 kloset jongkok Toto Type CE.9 1.00 unit 732,000.00
PIPA.
1 Pipa PVC type AW diameter 1/2" 1.00 m1 13,400.00
2 Pipa PVC type AW diameter 1" 1.00 m 1
20,900.00
3 Pipa PVC type AW diameter 1 1/2" 1.00 m1 24,500.00
4 Pipa PVC type AW diameter 2" 1.00 m 1
29,300.00
5 Pipa PVC type AW diameter 2 1/2" 1.00 m 1
35,000.00
6 Pipa PVC type AW diameter 3" 1.00 m1 45,000.00
7 Pipa PVC type AW diameter 4" 1.00 m 1
57,000.00
8 Pipa beton dia.30 cm - 100 cm 1.00 m 1
125,000.00
9 Pipa beton dia.15 cm - 20 cm 1.00 m1 75,000.00
10 Seal tape 1.00 set 5,000.00
11 Pisher 1.00 bh 2,500.00
KACA.
1 Jendela nako 1.00 bh 15,000.00
2 Kaca polos 1.00 m2 65,000.00
3 Kaca bening t = 3 mm 1.00 m2 65,000.00
4 Kaca bening t = 5 mm 1.00 m 2
85,000.00
5 Kaca bening t = 8 mm 1.00 m2 95,000.00
389,900.00 1,500,000.00
110,000.00
114,000.00
143,000.00
114,000.00
143,000.00
114,000.00
143,000.00
114,000.00
143,000.00
114,000.00
114,000.00
132,000.00
114,000.00
110,000.00
114,000.00
114,000.00
143,000.00
114,000.00
150,000.00
114,000.00
114,000.00
1,500,000.00
1,500,000.00
499.60
611.00
308,000.00
341,000.00
341,000.00
341,000.00
225,000.00
168,320.00
237,800.00
160,700.00 107.13
106,050.00 70.70
215,300.00 350.00
282,145.00
250,000.00 450.00
25.00
2,500.00
315,000.00
125,000.00
3,500.00
1,750,000.00
25,000.00
65,000.00
115,000.00
25,000.00
50,000.00
12,500.00
7,500.00
3,500.00
7,500.00
22,500.00
8,500.00
5,000.00
25,000.00
30,500.00
15,000.00
7,500.00
18,500.00
35,000.00
1,000.00
30,500.00
50,000.00
1,200.00
1,800.00
2,250.00
8,000.00
4,545.45
3,000.00
20,875.00
17,500.00
32,083.33
32,083.33
64,166.67
12,323.27
14,747.45
14,464.00
NURDIN IBRAHIM Harga Peralatan Dan material 12
301160017
16,875.00
97,268.50
-
1,362.00
2,182.88
1,700.00
1,700.00
35,000.00
54,000.00
11,040.00
10,925.00
23,100.00
19,360.00
11,360.00
11,044.00
11,900.00
10,819.00
10,970.00
10,794.00
10,746.00
2,200.00
75,000.00
12,392.00
18,000.00
35,000.00
9,500.00
9,500.00
1,500.00
12,500.00
25,000.00
42,500.00
25,000.00
2,500,000.00
2,650,000.00
1,200,000.00
1,800,000.00
1,850,000.00
2,500.00
1,850,000.00
5,000.00
1,500,000.00
2,000,000.00
1,800,000.00
950,000.00
9,150,000.00 28 btg
6,500,000.00 35 btg
6,500,000.00 28 btg
3,650,000.00 35 btg
3,650,000.00 28 btg
65,000.00
650,000.00
650,000.00
950,000.00
412,500.00
825.00
605.00
1,045.00
467.50
1,100.00
110.00
9,625.00
10,807.50
11,000.00
14,382.50
8,800.00
9,955.00
10,450.00
12,347.50
21,450.00
82.50
19,250.00
5,500.00
2,750.00
23,650.00
115,000.00 90,000.00
17,000.00
37,500.00
750.00
210,000.00
65,000.00
350,000.00
175,000.00
27,500.00
12,500.00
8,500.00
7,500.00
65,000.00
14,500.00
17,500.00
35,000.00
32,500.00
37,500.00
NURDIN IBRAHIM Harga Peralatan Dan material 16
301160017
37,500.00
500,000.00
15,000.00
65,000.00
13,000.00
3,400,000.00
505,000.00
2,500,000.00
247,000.00
425,000.00
1,732,000.00
334,000.00
408,000.00
1,240,000.00
732,000.00
414,000.00
70,000.00
100,000.00
13,400.00
20,900.00
24,500.00
29,300.00
35,000.00
45,000.00
57,000.00
125,000.00
75,000.00
5,000.00
2,500.00
15,000.00
65,000.00
65,000.00
85,000.00
95,000.00
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO URAIAN PEKERJAAN SATUANSATUANKOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.660 110,000.00
Tukang kayu L.02 OH 0.330 114,000.00
Kepala tukang L.03 OH 0.033 143,000.00
Mandor L.04 OH 0.033 132,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m
3 0.040 1,750,000.00
Paku 5 cm – 12 cm kg 0.400 19,360.00
Minyak bekisting Liter 0.200 2,500.00
HARGA SATUAN
NO URAIAN PEKERJAAN SATUANSATUANKOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.660 110,000.00
Tukang kayu L.02 OH 0.330 114,000.00
Kepala tukang L.03 OH 0.033 143,000.00
Mandor L.04 OH 0.033 132,000.00
JUMLAH
B BAHAN TENAGA
KERJA
Kayu kelas III m
3 0.030 1,750,000.00
Paku 5 cm – 12 cm kg 0.400 19,360.00
Minyak bekisting Liter 0.150 2,500.00
Balok kayu kelas II m
3 0.015 Rp 1,800,000.00
Plywood tebal 9 mm Lbr 0.350 Rp 115,000.00
Dolken kayu, 8– Batang 2.000 Rp 25,000.00
10 cm,panjang 4 m JUMLAH HARGA BAHAN
C PERALATAN
Jumlah Harga
(Rp)
11,000.00
11,400.00
1,430.00
660.00
24,490.00
232.32
360.00
18,550.00
19,142.32
43,632.32
6,544.85
50,177.17
JUMLAH HARGA
(Rp)
Rp 57,200.00
Rp 29,640.00
Rp 3,718.00
Rp 3,432.00
Rp 93,990.00
Rp 72,000.00
Rp 5,079.60
Rp 250.00
Rp 77,329.60
171,319.60
25,697.94
197,017.54
JUMLAH HARGA
(Rp)
57,200.00
29,640.00
3,718.00
3,432.00
78,750.00
5,808.00
250.00
84,808.00
178,798.00
26,819.70
205,617.70
JUMLAH HARGA
(Rp)
72,600.00
37,620.00
4,719.00
4,356.00
119,295.00
70,000.00
7,744.00
500.00
27,000.00
40,250.00
50,000.00
Rp 195,494.00
314,789.00
47,218.35
362,007.35
JUMLAH HARGA
(Rp)
72,600.00
37,620.00
4,719.00
4,356.00
119,295.00
Rp 70,000.00
Rp 7,744.00
Rp 500.00
205,250.00
30,787.50
236,037.50
JUMLAH HARGA
(Rp)
72,600.00
37,620.00
4,719.00
4,356.00
119,295.00
Rp 52,500.00
Rp 7,744.00
Rp 375.00
Rp 27,000.00
Rp 40,250.00
Rp 50,000.00
Rp 177,869.00
119,295.00
17,894.25
137,189.25
JUMLAH HARGA
(Rp)
82,500.00
3,300.00
85,800.00
85,800.00
12,870.00
98,670.00
JUMLAH HARGA
(Rp)
55,000.00
6,600.00
61,600.00
61,600.00
9,240.00
70,840.00
JUMLAH HARGA
(Rp)
16,500.00
1,980.00
18,480.00
285,360.00
285,360.00
303,840.00
45,576.00
349,416.00
JUMLAH HARGA
(Rp)
33,000.00
1,320.00
34,320.00
84,840.00
84,840.00
119,160.00
17,874.00
137,034.00
JUMLAH HARGA
(Rp)
85,800.00
44,460.00
5,577.00
5,148.00
140,985.00
270,000.00
69,422.40
339,422.40
480,407.40
72,061.11
552,468.51
JUMLAH HARGA
(Rp)
165,000.00
85,500.00
10,725.00
9,900.00
270,000.00
275,124.00
51,434.25
596,558.25
607,283.25
91,092.49
698,375.74
B. PEKERJAAN BETON
1. Membuat 1 m 3 beton mutu f’c = 16,9 Mpa
HARGA SATUAN
NO URAIAN PEKERJAAN KODE SATUAN KOEFISIEN
(Rp)
A TEBAGA KERJA
Pekerja L. 01 OH 1.650 110,000.00
Tukang batu L. 02 OH 0.275 114,000.00
Kepala Tukang L. 03 OH 0.028 143,000.00
Mandor L.04 OH 0.083 132,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen portlan kg 352.000 1,362.00
Pasir Beton kg 731.000 350.00
Krikil kg 1,031.000 450.00
Air Liter 215.000 25.00
JUMLAH HARGA SATUAN
C PERALATAN
JUMLAH HARGA
(Rp)
181,500.00
31,350.00
4,004.00
10,956.00
227,810.00
479,424.00
255,850.00
463,950.00
5,375.00
1,204,599.00
1,432,409.00
214,861.35
1,647,270.35
JUMLAH HARGA
(Rp)
181,500.00
31,350.00
4,004.00
10,956.00
227,810.00
444,012.00
266,000.00
463,050.00
5,375.00
1,178,437.00
1,406,247.00
210,937.05
1,617,184.05
JUMLAH HARGA
(Rp)
181,500.00
31,350.00
4,004.00
10,956.00
227,810.00
264,228.00
304,150.00
449,550.00
5,375.00
1,023,303.00
1,251,113.00
187,666.95
1,438,779.95
3. Pemasangan 1 m2 acian
HARGA SATUAN
NO URAIAN PEKERJAAN KODE SATUAN KOEFISIEN
(Rp)
A TEBAGA KERJA
Pekerja L.01 OH 0.200 110,000.00
Tukang batu L.03 OH 0.100 114,000.00
Kepala tukang L.03 OH 0.010 143,000.00
Mandor L.04 OH 0.010 132,000.00
JUMLAH TENAGA KERJA
TENTRI UTAMI DARISE
301160005 Analisa Harga Satuan Pekerjaan Pasangan
B BAHAN
Semen PC Kg 3.250 1,362.00
JUMLAH HARGA SATUAN
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH (A+B+C)
E Overhead & Profit ( Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)
66,000.00
22,800.00
2,860.00
3,960.00
95,620.00
85,540.00
44,877.90
6.43
130,424.33
226,044.33
33,906.65
259,950.98
JUMLAH HARGA
(Rp)
33,000.00
17,100.00
2,145.00
1,980.00
54,225.00
10,590.91
2,439.15
13,030.06
67,255.06
10,088.26
77,343.32
JUMLAH HARGA
(Rp)
22,000.00
11,400.00
1,430.00
1,320.00
36,150.00
TENTRI UTAMI DARISE
301160005 Analisa Harga Satuan Pekerjaan Pasangan
4,426.50
4,426.50
40,576.50
6,086.48
46,662.98
TENTRI UTAMI DARISE Analisa Harga Satuan Pekerjaan Kusen, pintu, Jendela, dan Ventilasi
301160005
B BAHAN
Papan kayu m3 0.064 1,850,000.00
Lem kayu Kg 0.500 14,500.00
JUMLAH HARGA SATUAN
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH (A+B+C)
E Overhead & Profit ( Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)
TENTRI UTAMI DARISE Analisa Harga Satuan Pekerjaan Kusen, pintu, Jendela, dan Ventilasi
301160005
4. Pemasangan 1 buah engsel angin
HARGA SATUAN
NO URAIAN PEKERJAAN KODE SATUANKOEFISIEN
(Rp)
A TEBAGA KERJA
Pekerja L.01 OH 0.015 110,000.00
Tukang kayu L.02 OH 0.150 114,000.00
Kepala tukang L.03 OH 0.015 143,000.00
Mandor L.04 OH 0.001 132,000.00
JUMLAH TENAGA KERJA
B BAHAN
Engsel angin buah 1,00 8,500.00
JUMLAH HARGA SATUAN
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH (A+B+C)
E Overhead & Profit ( Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)
TENTRI UTAMI DARISE Analisa Harga Satuan Pekerjaan Kusen, pintu, Jendela, dan Ventilasi
301160005
dela, kayu kelas II atau III
JUMLAH HARGA
(Rp)
660,000.00
2,052,000.00
257,400.00
39,600.00
3,009,000.00
2,160,000.00
24,200.00
14,500.00
2,198,700.00
5,207,700.00
781,155.00
5,988,855.00
JUMLAH HARGA
(Rp)
1,650.00
17,100.00
2,145.00
105.60
21,000.60
93,500.00
650.00
94,150.00
115,150.60
17,272.59
132,423.19
yu
JUMLAH HARGA
(Rp)
110,000.00
342,000.00
42,900.00
6,600.00
501,500.00
TENTRI UTAMI DARISE Analisa Harga Satuan Pekerjaan Kusen, pintu, Jendela, dan Ventilasi
301160005
118,400.00
7,250.00
125,650.00
627,150.00
94,072.50
721,222.50
TENTRI UTAMI DARISE Analisa Harga Satuan Pekerjaan Kusen, pintu, Jendela, dan Ventilasi
301160005
JUMLAH HARGA
(Rp)
1,650.00
17,100.00
2,145.00
105.60
21,000.60
8,500.00
8,500.00
29,500.60
4,425.09
33,925.69
JUMLAH HARGA
(Rp)
1,650.00
17,100.00
2,145.00
1,056.00
21,951.00
12,500.00
12,500.00
34,451.00
5,167.65
39,618.65
TENTRI UTAMI DARISE Analisa Harga Satuan Pekerjaan Kusen, pintu, Jendela, dan Ventilasi
301160005
E. PEKERJAAN PENUTUP ATAP DAN FLAFOND
1. Pek. 1M2 Pek. Atap Genteng Metal
HARGA SATUAN
NO URAIAN PEKERJAAN SATUANSATUANKOEFISIEN
(Rp)
A TEBAGA KERJA
Tukang L.01 OH 0.150 130,000.00
Pekerja L.02 OH 0.020 85,000.00
Kepala tukang L.03 OH 0.015 145,000.00
Mandor L.04 OH 0.200 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Genteng metal Lebar 1.600 45,000.00
Dinabol bh 12.000 1,000.00
JUMLAH HARGA SATUAN
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH (A+B+C)
E Overhead & Profit ( Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)
19,500.00
1,700.00
2,175.00
23,000.00
46,375.00
72,000.00
12,000.00
12,000.00
58,375.00
8,756.25
67,131.25
JUMLAH HARGA
(Rp)
16,500.00
35,750.00
3,575.00
990.00
56,815.00
12,375.00
20,125.00
5,700.00
38,200.00
95,015.00
14,252.25
109,267.25
JUMLAH HARGA
(Rp)
66,000.00
85,800.00
858.00
396.00
153,054.00
TENTRI UTAMI DARISE
301160005 Analisa Harga Satuan Pekerjaan Penutup Atap dan Plafond
7,875.00
1,312.50
9,187.50
162,241.50
24,336.23
186,577.73
9,900.00
10,260.00
1,287.00
660.00
22,107.00
43,501.15
1,552.68
170.00
318.15
45,541.98
67,648.98
10,147.35
77,796.33
JUMLAH HARGA
(Rp)
99,000.00
51,300.00
6,435.00
5,940.00
162,675.00
47,700.00
12,666.60
1,908.90
3,298.00
65,573.50
228,248.50
34,237.28
262,485.78
JUMLAH HARGA
(Rp)
27,500.00
14,250.00
95,896.32
13,347.60
2,210.00
4,772.25
116,226.17
161,551.17
24,232.68
185,783.85
77,000.00
39,900.00
5,005.00
4,620.00
126,525.00
12,939.44
14,164.80
4,772.25
850.00
32,726.49
159,251.49
23,887.72
183,139.21
J. Saklar tunggal
HARGA SATUAN
NO URAIAN PEKERJAAN SATUANSATUANKOEFISIEN
(Rp)
A TEBAGA KERJA
Tukang listrik L.01 OH 0.400 30,000.00
Pembantu tukang listrik L.02 OH 0.040 40,000.00
Kepala tukang listrik L.03 OH 0.040 45,000.00
Mandor L.04 OH 0.040 50,000.00
JUMLAH TENAGA KERJA
B BAHAN
Saklar tunggal bh 1.000 11,000.00
JUMLAH HARGA SATUAN
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH (A+B+C)
E Overhead & Profit ( Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)
J. Lampu sl 18 wat
HARGA SATUAN
NO URAIAN PEKERJAAN SATUANSATUANKOEFISIEN
(Rp)
A TEBAGA KERJA
pekerja L.01 OH 0.200 30,000.00
Tukang L.02 OH 0.150 40,000.00
Kepala tukang L.03 OH 0.015 45,000.00
Mandor L.04 OH 0.020 50,000.00
JUMLAH TENAGA KERJA
B BAHAN
Lampu 18 wat + peteng bh 1.000 27,000.00
JUMLAH HARGA SATUAN
C PERALATAN
JUMLAH HARGA PERALATAN
TENTRI UTAMI DARISE
301160005 Analisa harga satuan pekerjaan instalasi listrik
D JUMLAH (A+B+C)
E Overhead & Profit ( Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)
14,400.00
1,920.00
2,160.00
2,400.00
20,880.00
71,500.00
30,000.00
101,500.00
122,380.00
18,357.00
140,737.00
JUMLAH HARGA
(Rp)
110,000.00
110,000.00
27,000.00
45,000.00
80.00
180.00
21,600.00
100,000.00
193,860.00
303,860.00
45,579.00
349,439.00
JUMLAH HARGA
(Rp)
6,000.00
800.00
900.00
1,000.00
8,700.00
TENTRI UTAMI DARISE
301160005 Analisa harga satuan pekerjaan instalasi listrik
132,000.00
132,000.00
140,700.00
21,105.00
161,805.00
12,000.00
1,600.00
1,800.00
2,000.00
17,400.00
15,500.00
15,500.00
32,900.00
4,935.00
37,835.00
JUMLAH HARGA
(Rp)
12,000.00
1,600.00
1,800.00
2,000.00
17,400.00
11,000.00
11,000.00
28,400.00
4,260.00
32,660.00
JUMLAH HARGA
(Rp)
6,000.00
6,000.00
675.00
1,000.00
13,675.00
27,000.00
27,000.00
132,000.00
165,300.00
21,450.00
7,920.00
326,670.00
2,078,400.00
8,172.00
1,060.50
2,087,632.50
2,414,302.50
362,145.38
2,776,447.88
JUMLAH HARGA
(Rp)
110,000.00
171,000.00
21,450.00
6,600.00
309,050.00
505,000.00
8,172.00
1,060.50
3,497.20
517,729.70
826,779.70
124,016.96
950,796.66
JUMLAH HARGA
(Rp)
1,100.00
45,600.00
5,720.00
660.00
TENTRI UTAMI DARISE
301160005 Analisa Harga Satuan Pekerjaan Senitar
53,080.00
247,000.00
125.00
247,125.00
300,205.00
45,030.75
345,235.75
11,880.00
20,520.00
2,574.00
660.00
35,634.00
16,080.00
16,080.00
51,714.00
7,757.10
59,471.10
JUMLAH HARGA
(Rp)
5,940.00
10,260.00
1,287.00
396.00
17,883.00
35,160.00
35,160.00
53,043.00
7,956.45
60,999.45
JUMLAH HARGA
(Rp)
8,910.00
15,390.00
1,930.50
528.00
26,758.50
54,000.00
54,000.00
2,200.00
7,182.00
900.90
396.00
10,678.90
1,250.00
2,500.00
7,930.00
11,680.00
PERALATAN
22,358.90
3,353.84
25,712.74
JUMLAH HARGA
(Rp)
11,000.00
22,800.00
2,860.00
660.00
37,320.00
16,500.00
968.00
17,468.00
PERALATAN
54,788.00
8,218.20
63,006.20
JUMLAH HARGA
(Rp)
2,200.00
7,182.00
900.90
396.00
10,678.90
TENTRI UTAMI DARISE
301160005 Analisa Harga Satuan Pekerjaan Pengecetan
1,250.00
2,500.00
7,930.00
11,680.00
22,358.90
3,353.84
25,712.74
I. PEKERJAAN PERSIAPAN
1 Pek. Pengukuran Dan Pemasangan Bowplank 81.18 m
Jalur x 39.68 39.68
Jalur Y 41.50 41.50
2 Pek. Bekisting 93.60 M²
Pedestal 0.90 1.47 24.00 31.75
Sloof 81.18 0.30 2.00 48.71 M²
Kolom 0.90 3.65 4.00 13.14
3 Pek. Penyediaan Air & istrik
B. PEKERJAAN PONDASI
Pek. Pile Cab /Pondasi Poer Type P1 Beton Mutu Fc
1 1.20 1.20 0.20 24.00 6.91 M³
=19,3
Pek. Mpa
Sek poer /Kolom Pedestal K1 Beton Mutu Fc
2 0.30 0.15 1.47 24.00 1.59 M³
=19,3 Mpa
3 Pek. Anstamping Batu Belah 81.18 1.00 0.20 16.24 M³
4 Pek. Pondasi Batu Belah Sp. 1 4 81.18 0.30 0.80 0.80 45.46 M³
G. PEKERJAAN LANTAI
1 Pek. Lantai Granito 40cm x 40cm 98.14 M²
Toko 4.25 3.00 12.75
kamar Tidur 1 3.00 2.27 6.81
kamar Tidur 2 1.50 3.50 5.25
Ruang tamu 3.50 3.50 12.25
Taman 3.00 2.40 7.20
Ruang makan 4.25 4.50 19.13
Ruang keluarga 5.90 3.50 20.65
Dapur 4.50 2.30 10.35
Teras 1.50 2.50 3.75
I. PEKERJAAN SANITAR
1 Pas. Wastafel (Lengkap Accessories) 1.00 LS
2 Pas. Kloset Jongkok 2.00 LS
4 Pas. Mata Kran Stenlis 4.00 LS
5 Pek. Sepctitank + Resapan
6 Pas. Pipa PVC 1/2 23.45 M
7 Pas. Pipa PVC 2 13.00 M
9 Pas. Pipa PVC 4 11.23 M
J. PEKERJAAN PENGECETAN
Pek. Pengecetan Diding & Beton 567.60 M²
Pek. Pengecetan Plafond Gypsum + Profi Gypsum =
Pek.Lanati + list Profil 98.14 M²
B. PEKERJAAN PASANGAN
1 Pek. Pasangan Bata 1/2 batu Sp. 15 292.92 M²
x1 13.00 3.65 47.45
x2 3.50 3.65 ventlasi 12.38
E. PEKERJAAN LANTAI
1 Pek. Lantai Granito 40cm x 40cm 98.14 M²
Toko 4.25 3.00 12.75
kamar Tidur 1 3.00 2.27 6.81
kamar Tidur 2 1.50 3.50 5.25
Ruang tamu 3.50 3.50 12.25
Taman 3.00 2.40 7.20
Ruang makan 4.25 4.50 19.13
Ruang keluarga 5.90 3.50 20.65
Dapur 4.50 2.30 10.35
Teras 1.50 2.50 3.75
2 Pek. Lantai Kramik 25cm x 25cm (Anti Sleep) 2.25 1.50 3.38 M²
3 Pek. Dinding Kramik 25cm x 30cm 7.10 1.20 8.52 M²
4 Pek. List Kramik 10cm x 40cm 64.83 0.10 6.48 M²
G. PEKERJAAN SANITAR
1 Pas. Wastafel Lengkap Acc (Cermin, Kran Air Dll) 1.00 LS
2 Pas. Kloset Jongkok (Lengkap Accessories) 1.00 LS
4 Pas. Mata Kran Stenlis 2.00 LS
5 Pas. Pipa PVC 1/2 22.00 M
NURDIN IBRAHIM 301160017 Hitunagn Volume Pekerjaan 91
6 Pas. Pipa PVC 2 16.00 M
8 Pas. Pipa PVC 4 14.00 M
1/2.L.T.P.N
P.L.T.N
P.L.T.N
P.L.T
P.L.T
P.L.T
P.L.T
P.L.T
P.L.T
P.L.T
P.L.T
P.L.T
(P.L)-PR
(P.L)-PR
(P.L)-PR
(P.L)-PR
(P.L)-PR
(P.L)-PR
(P.L)-PR
(P.L)-PR
(P.L)-PR
P.T
P.T
(P.L)-PR
P.L
(P.L)-PR
P.T
P.T
P.T
P.T
P.T
P.T
P.T
P.T
P.L.N
((P.L)-PR)*N
((P.L)-PR)*N
NURDIN IBRAHIM 301160017 Hitunagn Volume Pekerjaan 100
P.L.N
((P.L)-PR)*N
P.L.N
((P.L)-PR)*N
((P.L)-PR)*N
((P.L)-PR)*N
((P.L)-PR)*N
P.L.N
((P.L)-PR)*N
((P.L)-PR)*N
P.L.N
P.L.N
((P.L)-PR)*N
P.L.N
((P.L)-PR)*N
P.L.T
P.L.T
P.L.T
P.L.T
P.L.T
P.L.T
P.L.T
P.L.N
P.L
P.L.N
P.L.N
P.L.T
P.L.T
P.L
P.L
P.L
P.L
P.L
P.L
P.L
P.L
P.L
P.L
P.L
P.L
P.L
P.L
P.L
P.L
P.L
P.L
P.L
PekPlesteran
P.L.T.N
P.L.T.N
P.L.T
P.L.T
(P.L)-PR
(P.L)-PR
(P.L)-PR
(P.L)-PR
(P.L)-PR
(P.L)-PR
(P.L)-PR
(P.L)-PR
P.T
P.T
(P.L)-PR
P.L
(P.L)-PR
P.T
P.L.N
((P.L)-PR)*N
((P.L)-PR)*N
P.L.N
((P.L)-PR)*N
P.L.N
((P.L)-PR)*N
((P.L)-PR)*N
((P.L)-PR)*N
((P.L)-PR)*N
P.L.N
((P.L)-PR)*N
((P.L)-PR)*N
P.L.N
P.L.N
((P.L)-PR)*N
P.L.N
NURDIN IBRAHIM 301160017 Hitunagn Volume Pekerjaan 108
((P.L)-PR)*N
P.L.T
P.L.T.N
P.L.T
P.L.T.N
P.L.T
P.L.T
P.L.T.N
P.L.N
P.L.N
P.L.N
P.L.N
P.L.T
P.L.T
P.L.T.N
P.L.T
P.L.T.N
P.L.T.N
P.L
P.L
P.L
P.L
P.L
P.L
P.L
P.L
P.L
P.T
P.T
P.T
P.L.N
((P.L)-PR)*N
((P.L)-PR)*N
P.L.N
((P.L)-PR)*N
P.L.N
((P.L)-PR)*N
((P.L)-PR)*N
((P.L)-PR)*N
((P.L)-PR)*N
P.L.N
((P.L)-PR)*N
((P.L)-PR)*N
P.L.N
P.L.N
((P.L)-PR)*N
P.L.N
((P.L)-PR)*N
P.L
P.L
P.L
P.L
P.L
P.L
P.L
P.L
P.L
P.T
NURDIN IBRAHIM 301160017 Hitunagn Volume Pekerjaan 114
HITUNGAN VOLUME PEMBESIAN
Pembesian
JUMLAH TOTAL
PANJANG KUKU
STATIONING BATANG PANJANG
M1 M1 M1 M1
a b c d f=(b+d)*c
PONDASI
Tulangan utama telapk 2.45 32.00 0.01 78.72
Tulanag Utaman Pedestal
Begel
SLOOF
Tulangan Utama Ø16 X1 10.00 13.00 0.01 130.13
2 4.50 13.00 0.01 58.63
3 1.30 13.00 0.01 17.03
4 1.30 13.00 0.01 17.03
5 10.00 13.00 0.01 130.13
6 5.50 13.00 0.01 71.63
7 4.00 13.00 0.01 52.13
8 2.50 13.00 0.01 32.63
9 5.50 13.00 0.01 71.63
10 4.50 13.00 0.01 58.63
11 10.00 13.00 0.01 130.13
Y1 20.00 13.00 0.01 260.13
2 2.75 13.00 0.01 35.88
3 4.00 13.00 0.01 52.13
4 8.25 13.00 0.01 107.38
5 16.00 13.00 0.01 208.13
6 3.50 13.00 0.01 45.63
7 20.00 13.00 0.01 260.13
8 7.80 13.00 0.01 101.53
Begel Ø10 1.12 565.60 0.01 639.13
KOLOM K1
Tulangan utama Ø16 21 7.75 10.00 0.01 1,629.60
Begel Ø10 1.30 813.75 0.01 1,066.01
KOLOM K2
Tulangan utama Ø16 17 3.65 6.00 0.01 21.96
Begel Ø10 1.10 310.25 0.01 344.38
KOLOM K3
Tulangan utama Ø10 20 3.75 4.00 0.01 15.04
Begel Ø6 1.1 375.00 0.01 416.25
Balok latey
Tulangan utama Ø10 2 141.40 4.00 0.01 1,131.28
Begel Ø6 2 0.55 707.00 0.01 791.84
Ring Balok
Tulangan utama Ø10 2 141.40 4.00 0.01 1,131.28
Begel Ø6 2 0.80 707.00 0.01 1,145.34
Jumlah= 3,259.63
1.557 202.612
1.557 91.287
1.557 26.516
1.557 26.516
1.557 202.612
1.557 111.528
1.557 81.166
1.557 50.805
1.557 111.528
1.557 91.287
1.557 202.612
1.557 405.022
1.557 55.865
1.557 81.166
1.557 167.191
1.557 324.058
1.557 71.046
1.557 405.022
1.557 158.082
0.616 393.703
Jumlah= ###
1.557 2,537.287
0.616 656.664
Jumlah= 246.328
1.557 34.192
0.616 212.137
Jumlah= 101.543
0.6166666667 9.275
0.2216666667 92.269
Jumlah= 873.147
0.6166666667 697.623
0.2216666667 175.525
Jumlah= ###
1.557 1,761.403
0.616 705.529
###
KURVA S (TIME SCHEDULE)
180 hari kerja
I. PEKERJAAN PERSIAPAN
1 Pek. Pengukuran Dan Pemasangan Bowplank 0.59 ###
2 Pek. Bekisting 2.67 1.33 1.33 Cha
3 Pek. Penyediaan Air & istrik -
B. PEKERJAAN PONDASI
Pek. Pile Cab /Pondasi Poer Type P1 Beton Mutu Fc
1 1.65 ### ### 0.55
=16,9
Pek. Mpa
Sek poer /Kolom Pedestal K1 Beton Mutu Fc =16,9
2 0.38 ### ### 0.13
Mpa
3 Pek. Anstamping Batu Belah 1.30 ### ### ###
4 Pek. Pondasi Batu Belah Sp. 1 4 4.59 ### 1.53 1.53
C. PEKERJAAN BETON
1 Pek. Sloof Beton Bertulang S1 Beton Mutu Fc =16,9Mps 0.87 0.43 0.43
2 Pek. Sloof Beton Bertulang S2 Beton mutu Fc =14,5Mps 0.04 0.04
Pek. Kolom Beton Bertulang K2 Beton mutu Fc
3 0.02 0.01 0.01
=16,9Mps
Pek. Kolom Praktis Beton Bertulang KP Beton mutu Fc
4 0.02
=14,5 Mps Beton bertulang 15x30 Beton mutu Fc =14,5
Pek. Balok
5 1.20 0.40
Mps
Pek. Balok beton Bertulang 12x20 Beton mutu Fc
6 0.06 0.03
=16,9,3 Mps
Pek. Balok Beton Bertulang 12x15 Beton mutu Fc =16,9
7 0.13 0.06 0.06
Mps
Pek. Balok Beton Bertulang 12x10 Beton mutu Fc =16,9
8 0.11 0.11
Mps
KURVA S (TIME SCHDULE)
9 Pek. Plat Beton Bertulang Beton Mute Fc = 16,9 Mpa 2.58
10 Pek. Tangga Beton Bertulag Beton Mutu Fc =14,5 Mpa 0.33
11 Pek. Cor Rabat Beton Beton Mutu Fc =7,4 Mpa 1.80 0.90 0.90
D. PEKERJAAN PASANGAN
1 Pek. Pasangan Bata 1/2 Batu Sp. 13 ### 2.75 2.75 2.75
3 Pek. Plesteran Diding + Beton SP. 13 6.35 1.59 1.59
5 Pek. Acian 3.83 0.96 0.96
G. PEKERJAAN LANTAI
1 Pek. Lantai Granito 40cm x 40cm 2.64
2 Pek. Lantai Kramik 20cm x 20cm (Anti Sleep) 0.53
3 Pek. Dinding Kramik 20cm x 30cm 0.35
4 Pek. List Kramik 10cm x 40cm 0.07
I. PEKERJAAN SANITAR
1 Pas. Wastafel (Lengkap Accessories) 0.40
2 Pas. Kloset Duduk (Lengkap Accessories) 0.27
4 Pas. Mata Kran Stenlis 0.20
6 Pas. Pipa PVC 1/2 0.20
7 Pas. Pipa PVC 2 0.11
9 Pas. Pipa PVC 4 0.15
J. PEKERJAAN PENGECETAN
Pek. Pengecetan Diding & Beton 2.11
Pek. Pengecetan Plafond Gypsum + Profi Gypsum 0.36
B. PEKERJAAN PASANGAN
1 Pek. Pasangan Bata 1/2 batu Sp. 15 ###
2 Pek. Plesteran Dinding + Beton Sp. 13 7.91
4 Pek. Acian 4.77
E. PEKERJAAN LANTAI
1 Pek. Lantai Granito 40cm x 40cm 2.64
2 Pek. Lantai Kramik 20cm x 20cm (Anti Sleep) 0.09
3 Pek. Dinding Kramik 20cm x 30cm 0.32
4 Pek. List Kramik 10cm x 40cm 0.07
G. PEKERJAAN SANITAR
1 Pas. Wastafel Lengkap Acc (Cermin, Kran Air Dll) 0.40
2 Pas. Kloset Duduk (Lengkap Accessories) 0.14
4 Pas. Mata Kran Stenlis 0.10
5 Pas. Pipa PVC 1/2 0.19
6 Pas. Pipa PVC 2 0.14
8 Pas. Pipa PVC 4 0.19
H. PEKERJAAN PENGECETAN
1 Pek. Pengecetan Diding & Beton 2.63
2 Pek. Pengecetan Plafond Gypsum + Profi Gypsum 0.36
100
RENCANA ### ### ### ### ### 3.71 3.12 1.42 4.56 6.82 6.70
KAMULATIF ### ### ### ### ### ### ### ### ### ### ###
NURDIN IBRAHIM
TUGAS MENEGEMEN PROYEK FAK
301160017 KURVA S (TIME SCHDULE)
NURDIN IBRAHIM
TUGAS MENEGEMEN PROYEK FAK
301160017
Chart Title
95
90
85
0.01 0.01
0.40 0.40
80
0.03
1.29 1.29
0.33
75
2.75
1.59 1.59
0.96 0.96
70
0.14 0.14
0.06 0.06
1.02 1.02
0.20
0.06 0.06 0.06
0.03 0.03 0.03
65
0.02 0.02
60
1.32 1.32
0.53
0.35
0.07
55
0.05
1.59
0.02
P
0.03
0.05 0.05
H
50
KURVA S (TIME SCHDULE)
P
0.06 0.06
H
50
0.20 0.20
0.14 0.14
0.10
0.20
0.10
O
0.06 0.06 45
0.08 0.08
1.05 1.05
0.18 0.18
40
0.43
0.09
0.38
0.34
35
5.50 5.50
7.91
4.77
30
0.21 0.21
0.12
0.24
0.10 0.10
0.10 0.10
0.10 25
0.02
0.90 0.90
0.80 0.80
1.75
20
2.64
0.09
0.16 0.16
0.07
15
0.01 0.01
0.01 0.01
0.04 0.04
0.03 0.03
0.01 0.01 10
0.40
0.14
0.03 0.03 0.03
0.06 0.06 0.06
5
0.05 0.05 0.05
0.06 0.06 0.06
1.31 1.31
0.18 0.18
0
6.07 4.27 7.74 7.31 ### 8.03 3.89 3.65 2.42 0.20 3.04 2.73
### ### ### ### ### ### ### ### ### ### ### ### ###
I. PEKERJAAN PERSIAPAN
1 Pek. Pengukuran Dan Pemasangan Bowplank 81.18 m
2 Pek. Bekisting 93.60 M²
3 Pek. Penyediaan Air & istrik - -
B. PEKERJAAN PONDASI
Pek. Pile Cab /Pondasi Poer Type P1 Beton Mutu Fc
1 6.91 M³
=16,9
Pek. Mpa
Sek poer /Kolom Pedestal K1 Beton Mutu Fc
2 1.59 M³
=16,9 Mpa
3 Pek. Anstamping Batu Belah 16.24 M³
4 Pek. Pondasi Batu Belah Sp. 1 4 45.46 M³
C. PEKERJAAN BETON
Pek. Sloof Beton Bertulang S1 Beton Mutu Fc
1 3.65 M³
=16,9Mps
Pek. Sloof Beton Bertulang S2 Beton mutu Fc
2 0.16 M³
=14,5Mps
Pek. Kolom Beton Bertulang K2 Beton mutu Fc
3 0.09 M³
=16,9Mps
Pek. Kolom Praktis Beton Bertulang KP Beton mutu
4 0.07 M³
Fc =14,5
Pek. BalokMps
Beton bertulang 15x30 Beton mutu Fc
5 5.11 M³
=14,5 Mps
Pek. Balok beton Bertulang 12x20 Beton mutu Fc
6 0.24 M³
=16,9,3 Mps
Pek. Balok Beton Bertulang 12x15 Beton mutu Fc
7 0.54 M³
=16,9
Pek. Mps Beton Bertulang 12x10 Beton mutu Fc
Balok
8 0.47 M³
=16,9 Mps
9 Pek. Plat Beton Bertulang Beton Mute Fc = 16,9 Mpa 10.84 M³
Pek. Tangga Beton Bertulag Beton Mutu Fc =14,5
10 1.42 M³
Mpa
11 Pek. Cor Rabat Beton Beton Mutu Fc =7,4 Mpa 8.67 M³
D. PEKERJAAN PASANGAN
1 Pek. Pasangan Bata 1/2 Batu Sp. 13 ### M²
3 Pek. Plesteran Diding + Beton SP. 13 ### M²
5 Pek. Acian ### M²
G. PEKERJAAN LANTAI
1 Pek. Lantai Granito 40cm x 40cm 98.14 M²
2 Pek. Lantai Kramik 20cm x 20cm (Anti Sleep) 14.00 M²
3 Pek. Dinding Kramik 20cm x 30cm 9.12 M²
4 Pek. List Kramik 10cm x 40cm 6.48 M²
I. PEKERJAAN SANITAR
1 Pas. Wastafel (Lengkap Accessories) 1.00 LS
2 Pas. Kloset Duduk (Lengkap Accessories) 2.00 LS
4 Pas. Mata Kran Stenlis 4.00 LS
6 Pas. Pipa PVC 1/2 23.45 M
7 Pas. Pipa PVC 2 13.00 M
9 Pas. Pipa PVC 4 11.23 M
J. PEKERJAAN PENGECETAN
Pek. Pengecetan Diding & Beton ### M²
Pek. Pengecetan Plafond Gypsum + Profi Gypsum 98.14 M²
B. PEKERJAAN PASANGAN
1 Pek. Pasangan Bata 1/2 batu Sp. 15 ###
2 Pek. Plesteran Dinding + Beton Sp. 13 ### M²
4 Pek. Acian ### M²
E. PEKERJAAN LANTAI
1 Pek. Lantai Granito 40cm x 40cm 98.14 M²
2 Pek. Lantai Kramik 20cm x 20cm (Anti Sleep) 3.38 M²
3 Pek. Dinding Kramik 20cm x 30cm 8.52 M²
4 Pek. List Kramik 10cm x 40cm 6.48 M²
G. PEKERJAAN SANITAR
1 Pas. Wastafel Lengkap Acc (Cermin, Kran Air Dll) 1.00 LS
2 Pas. Kloset Duduk (Lengkap Accessories) 1.00 LS
4 Pas. Mata Kran Stenlis 2.00 LS
5 Pas. Pipa PVC 1/2 22.00 M
6 Pas. Pipa PVC 2 16.00 M
8 Pas. Pipa PVC 4 14.00 M
H. PEKERJAAN PENGECETAN
1 Pek. Pengecetan Diding & Beton ### M²
2 Pek. Pengecetan Plafond Gypsum + Profi Gypsum 98.14 M²
HARGA
HARGA TOTAL
SATUAN
###
Rp 50,177.17 Rp 4,073,382.50
Rp197,017.54 Rp 18,440,841.74
Rp -
###
Rp 98,670.00 Rp 12,375,586.08
Rp 70,840.00 Rp 5,324,136.05
Rp349,416.00 Rp 20,829,299.24
Rp137,034.00 Rp 905,739.93
Rp137,034.00 Rp 1,188,194.41
###
### Rp 11,385,932.66
### Rp 2,615,206.41
Rp552,468.51 Rp 8,969,878.73
Rp698,375.74 Rp 31,748,719.73
###
### Rp 6,017,643.32
### Rp 265,622.48
### Rp 144,300.88
### Rp 106,248.99
### Rp 8,269,228.06
### Rp 395,344.88
### Rp 884,485.34
### Rp 775,864.33
### Rp 17,853,939.69
### Rp 2,291,549.80
### Rp 12,475,373.19
###
Rp259,950.98 Rp 76,145,725.99
Rp 77,343.32 Rp 43,899,821.67
Rp 46,662.98 Rp 26,485,755.29
###
### Rp 1,987,820.75
Rp132,423.19 Rp 859,373.53
Rp721,222.50 Rp 14,097,014.99
Rp 33,925.69 Rp 1,357,027.60
Rp 39,618.65 Rp 1,347,034.10
Rp 33,925.69 Rp 576,736.73
Rp123,100.00 Rp 246,200.00
NURDIN IBRAHIM 301160017 Rencana anggaran biaya
###
Rp109,267.25 Rp 12,252,683.08
Rp186,577.73 Rp 12,095,833.91
###
Rp185,783.85 Rp 18,231,897.68
Rp262,485.78 Rp 3,674,800.85
Rp262,485.78 Rp 2,393,870.27
Rp 77,796.33 Rp 504,353.61
###
Rp349,439.00 Rp 349,439.00
Rp140,737.00 Rp 10,977,486.00
Rp 32,660.00 Rp 163,300.00
Rp 37,835.00 Rp 189,175.00
Rp161,805.00 Rp 647,220.00
Rp 46,776.25 Rp 795,196.25
###
Rp 25,712.74 Rp 14,594,466.11
Rp 25,712.74 Rp 2,523,319.25
Rp8,617,549.24
### Rp 3,004,225.77
### Rp 624,569.42
### Rp 2,625,660.02
### Rp 2,363,094.02
###
Rp259,950.98 Rp 76,145,725.99
Rp 77,343.32 Rp 54,706,849.27
Rp 46,662.98 Rp 33,005,879.46
Rp8,994,541.52
### Rp 2,968,795.20
Rp132,423.19 Rp 834,160.16
Rp721,222.50 Rp 1,694,007.41
Rp 33,925.69 Rp 1,357,027.60
Rp 39,618.65 Rp 1,347,034.10
Rp 39,618.65 Rp 673,517.05
Rp120,000.00 Rp 120,000.00
###
Rp 67,131.25 Rp 7,663,032.19
Rp109,267.25 Rp 11,132,693.77
Rp186,577.73 Rp 12,095,833.91
###
Rp185,783.85 Rp 18,231,897.68
Rp183,139.21 Rp 618,094.83
Rp262,485.78 Rp 2,236,378.80
Rp 77,796.33 Rp 504,353.61
Rp1,351,863.50
Rp 32,660.00 Rp 195,960.00
Rp 37,835.00 Rp 75,670.00
Rp161,805.00 Rp 485,415.00
NURDIN IBRAHIM 301160017 Rencana anggaran biaya
Rp 46,776.25 Rp 467,762.50
Rp 42,352.00 Rp 127,056.00
Rp8,002,283.28
### Rp 2,776,447.88
Rp950,796.66 Rp 950,796.66
Rp345,235.75 Rp 690,471.50
Rp 59,471.10 Rp 1,308,364.20
Rp 60,999.45 Rp 975,991.20
Rp 92,872.28 Rp 1,300,211.85
###
Rp 25,712.74 Rp 18,187,255.14
Rp 25,712.74 Rp 2,523,319.25
TOTAL ###
NO URAIAN PEKERJAAN
I. PEKERJAAN PERSIAPAN
22,514,224.24
400,507,375.83
40,622,955.70
54,719,737.52
49,479,600.97
146,531,302.95
20,471,207.70
24,348,516.99
24,804,922.40
13,121,816.25
9,289,529.98
17,117,785.35
264,017,551.43
8,617,549.24
163,858,454.72
8,994,541.52
30,891,559.87
21,590,724.92
1,351,863.50
8,002,283.28
20,710,574.39
687,039,151.50
###
###
###