Anda di halaman 1dari 140

DAFTAR STANDARNISASI HARGA PERALATAN

UPAH
KABUPATEN PUHUWATO GORONTALO. DAN MATERIAL.
PRIODE : PEB.2018
Jumlah Hari & PPN Upah
NO Peralatan / Pekerja
Orang JAM 1.1 '(Rp/Org/Hr)

PERALATAN :
1 BULDOSER 110 HP 1.00 jam 389,900.00
PEKERJA :

1 Pekerja / Knek 1.00 org / hri 110,000.00


2 Tukang Gali 1.00 org / hri 114,000.00
3 Kepala Tukang Batu 1.00 org / hri 143,000.00
4 Tukang Batu 1.00 org / hri 114,000.00
5 Kepala Tukang Kayu 1.00 org / hri 143,000.00
6 Tukang Kayu 1.00 org / hri 114,000.00
7 Kepala Tukang Besi 1.00 org / hri 143,000.00
8 Tukang Besi 1.00 org / hri 114,000.00
9 Kepala Tukang Cat 1.00 org / hri 143,000.00
10 Tukang Cat 1.00 org / hri 114,000.00
11 Tukang aspal 1.00 org / hri 114,000.00
12 Mandor / Pengawas 1.00 org / hri 132,000.00
13 Instalator 1.00 org / hri 114,000.00
14 Pembantu Instalator 1.00 org / hri 110,000.00
15 Tukang babat Rumput 1.00 org / hri 114,000.00
16 Tukang Taman 1.00 org / hri 114,000.00
17 Kepala Tukang Pasang Pipa / Leding 1.00 org / hri 143,000.00
18 Tukang Pasang Pipa / Leding 1.00 org / hri 114,000.00
19 Operator Alat Besar 1.00 org / hri 150,000.00
20 Pembantu Operator Alat besar 1.00 org / hri 114,000.00
21 Tukang Las 1.00 org / hri 114,000.00
22 Petugas Siang hari 1.00 bln 1,500,000.00
23 Petugas Malam hari 1.00 bln 1,500,000.00

MATERIAL :
BATU :
1 Batu Bata merah Press Mesin 1.00 bh 499.60
2 Batu Bata merah uk.20x9,5x4 cm uk.kecil
Proses tangan. 1.00 bh 611.00
3 batu pecah (3-5 Cm) 1.00 m3 308,000.00
4 batu pecah (2-3 Cm) 1.00 m 3
330,000.00
5 batu pecah (1-2 Cm) 1.00 m 3
341,000.00
6 Batu pecah 1/3 1.00 m 3
341,000.00
7 Batu Belah 1.00 m3 225,000.00
8 Koral Beton 1.00 m 3
168,320.00
9 Sirtu 1.00 m 3
237,800.00

NURDIN IBRAHIM Harga Peralatan Dan material 1


301160017
10 Roster 1.00 bh 2,500.00
11 Batu belah 15/20 1.00 m3 290,823.00
12 Batu pecah 5/7 1.00 215,000.00
13 Kerikil 1.00 m3 250,000.00
14 Batu tempel hitam 1.00 m2 185,000.00
15 Bata Klinker 1.00 m2 3,500.00

PASIR :
1 Pasir Urug 1.00 m3 160,700.00
2 Pasir Pasang 1.00 m 3
106,050.00
3 Pasir Cor / Pasir beton 1.00 m 3
215,300.00
4 Pasir Ayak Untuk Beton 1.00 m3 282,145.00
5 Kerikil 1.00 m 3
250,000.00
6 Air 1.00 Ltr 25.00
7 Minyak Bekisting 1.00 Ltr 2,500.00

NURDIN IBRAHIM Harga Peralatan Dan material 2


301160017
Jumlah Hari & PPN Upah
NO Peralatan / Pekerja
Orang JAM 1.1 '(Rp/Org/Hr)

BEKISTING :
1 Multiplek fenol film 15 mm 1.00 Lbr 315,000.00
2 Multiplek 9 mm 1.00 Lbr 125,000.00
3 Minyak bekesting 1.00 Ltr 3,500.00
4 Kayu bekesting 1.00 m3 1,750,000.00
5 Schafolding 1.00 25,000.00
6 Plywood t. 6 mm 1.00 Lbr 65,000.00
7 Plywood t. 9 mm 1.00 Lbr 115,000.00

CAT :
1 Cat tembok Cathylac 1.00 kg 25,000.00
2 Cat Kayu Emco 1.00 kg 50,000.00
3 Dempul/Plamur 1.00 kg 12,500.00
4 Minyak cat 1.00 kg 7,500.00
5 Kertas gosok / ampelas 1.00 lbr 3,500.00
6 Minyak cat 1.00 kg 7,500.00
7 Meni besi 1.00 kg 22,500.00
8 Plamur tembok 1.00 kg 8,500.00
9 Sabun 1.00 bh 5,000.00
10 Cat dasar 1.00 kg 25,000.00
11 Cat penutup 1.00 kg 30,500.00
12 Dempul kayu 1.00 kg 15,000.00
13 Kuas 1.00 bh 7,500.00
14 Perekat 1.00 kg 18,500.00
15 Wall paper 1.00 m2 35,000.00
16 Pengecatan Konst.Baja 1.00 kg 1,000.00
17 Cat penutup 1.00 kg 30,500.00

LANTAI :
1 Keramik Roman KW 1 1.00 m2 50,000.00
2 Keramik 10 x 20 cm Ex.Roman 1.00 bh 1,200.00
3 Keramik 20 x 20 cm Ex.Roman. 1.00 bh 45,000.00
4 Keramik 25 x 25 cm Ex.Roman 1.00 bh 2,250.00
5 Keramik 33,3 x 33,3 cm Ex.Roman 1.00 bh 8,000.00
6 Keramik 30 x 30 cm Ex Roman 1.00 bh 50,000.00
7 Keramik 20 x 25 cm Ex Roman 1.00 bh 3,000.00
8 Keramik 45 x 45 cm Ex Roman 1.00 bh 20,875.00
9 Keramik Essenza 30x30 ( Unpolish ) Colour 1.00 bh 17,500.00
10 Keramik Essenza 30x60 ( Unpolish ) Colour 1.00 bh 32,083.33
11 Keramik Essenza 40x40 ( Unpolish ) Colour 1.00 bh 32,083.33
12 Keramik Essenza 60x60 ( Unpolish ) Colour 1.00 bh 64,166.67
13 Granito 30x30 ( Unpolish ) Colour 1.00 bh 12,323.27
14 Granito 30x30 ( Polished ) Colour 1.00 bh 14,747.45
15 Granito 40x40 ( Unpolish ) Colour 1.00 bh 14,464.00
NURDIN IBRAHIM Harga Peralatan Dan material 3
301160017
16 Granito 40x40 ( Polished ) Colour 1.00 bh 16,875.00
17 Granito 60x60 ( Unpolish ) Colour 1.00 bh 97,268.50
18 Granito 60x60 ( Polished ) Colour 1.00 bh

SEMEN :
1 Semen Tiga Roda / 50 Kg 1.00 kg 68,100.00
2 Semen Putih Tiga Roda / 40 Kg 1.00 kg 87,315.00
3 Semen Warna 1.00 kg 1,700.00
4 Semen putih 1.00 kg 1,700.00
5 Beton Instan k225 1.00 sak 35,000.00
6 Bounding Agent 1.00 ltr 54,000.00

BESI DAN KAWAT.


1 Tulangan Besi Beton Ulir 1.00 Kg 11,040.00
2 Tulangan Besi Beton Polos 1.00 Kg 10,925.00
3 Kawat Beton 1.00 Kg 23,100.00
4 Paku Segala ukuran ( Rata - Rata ) 1.00 Kg 19,360.00

NURDIN IBRAHIM Harga Peralatan Dan material 4


301160017
Jumlah Hari & Upah
NO Peralatan / Pekerja PPN
Orang JAM '(Rp/Org/Hr)

5 Plat Besi Strip 1.00 Kg 11,360.00


6 Besi Canal U ( Channel ) 1.00 Kg 11,044.00
7 Besi Plat Hitam Segala Ukuran 1.00 Kg 11,900.00
8 Baja Siku 1.00 Kg 10,819.00
9 Bordes Plat 1.00 Kg 10,970.00
10 Baja WF 1.00 Kg 10,794.00
11 H Beam 1.00 Kg 10,746.00
12 Kawat Duri 10 kg ( P.60 m ) 1.00 Roll 132,000.00
13 Wire Mesh M-8 1.00 m2 75,000.00
14 Besi strip 1.00 Kg 12,392.00
15 Paku Payung 1.00 Kg 18,000.00
16 Paku Anti Karat 1.00 Kg 35,000.00
17 Paku triplek 1.00 Kg 9,500.00
18 Paku Biasa 1/2" 1.00 Kg 9,500.00
19 Kawat Las.AW.SE.6013. 1.00 Btg 1,500.00
20 Besi strip 2x3 1.00 m1 12,500.00
21 Paku skrup 3,5" 1.00 kg 25,000.00
22 Jaring Kawat Baja Las Wiremesh M8 2,10 x 5,40 m 1.00

KAYU.
1 Dolken kayu dia. 8 - 400 cm 1.00 btg 25,000.00
2 Kayu meranti 5/7 MB 1.00 m3 2,500,000.00
3 Papan kayu meranti 3/30 MB 1.00 m3 2,650,000.00
4 Kayu ulin 10/10-400 1.00 m 3
1,200,000.00
5 Kayu Bangkirai 1.00 m 3
1,800,000.00
6 Papan Kayu Bangkirai 1.00 m3 1,850,000.00
7 List kayu profil 1.00 m 1
2,500.00
8 Balok 8/15 & 6/15 ( Kayu borneo ) 1.00 m 1
1,850,000.00
9 Kayu Profil 1.00 m1 5,000.00
10 Papan Ulin 1.00 m 3
1,500,000.00
11 Kayu Ulin 1.00 m3 2,000,000.00
12 kayu borneo balok 1.00 m3 1,800,000.00
13 Papan Cor 2/20 1.00 m3 950,000.00
14 Papan 3/30 x 4m Kamper Samarinda Oven 1.00 m 3
9,150,000.00
15 Balok 6/12x 4 m Kamper Medan 1.00 m 3
6,500,000.00
16 Papan 3/30 x 4m Kamper Medan 1.00 m3 6,500,000.00
17 Balok 6/12x 4 m Bangkirai 1.00 m 3
3,650,000.00
18 Papan 3/30 x 4m Bangkirai 1.00 m 3
3,650,000.00
19 Plywood t = 4 mm 1.00 Lbr 65,000.00

ATAP.

NURDIN IBRAHIM Harga Peralatan Dan material 5


301160017
1 Paku Peluru 1.00 lbr 55,600.00
2 Seng plat 1.00 lbr 35,000.00
3 Asbes Gelombang 1.00 lbr 41,000.00
4 Genteng Beton 1.00 bh 3,000.00
5 Nok genteng beton 1.00 bh 3,300.00
6 Nok genteng metal 1.00 bh 45,000.00
7 Seng plat bjls 28 1.00 lbr 37,800.00
8 Aluminium foil 1 Muka 1.00 m2 3,500.00
9 Genteng Type KM.1 ( Natural ) 1.00 bh 6,500.00
10 Nock Genteng Type KM.2 ( Natural ) 1.00 bh 15,000.00

BETON READY MIX.


1 Beton K.B0 1.00 m3 650,000.00
2 Beton K.175 Slump.12 1.00 m3 780,000.00
3 Beton K.225 Slump.12 1.00 m3
950,000.00
4 Sewa pompa & alat bantu 1.00 Jam 412,500.00

NURDIN IBRAHIM Harga Peralatan Dan material 6


301160017
Jumlah Hari & Upah
NO Peralatan / Pekerja PPN
Orang JAM '(Rp/Org/Hr)
PLAFOND.
1 Main Tee Clip. 1.00 pcs 825.00
2 Rod Drat BWG.8 1.00 pcs 605.00
3 Mur + Ring 1.00 pcs 1,045.00
4 Angle Clip 1.00 pcs 467.50
5 Paku Peluru 1.00 pcs 1,100.00
6 Concrete nail 1.00 pcs 110.00
7 Metalstud 50x33 mm,t = 0,45 mm 1.00 m1 9,625.00
8 Metalstud 64x33 mm,t = 0,45 mm 1.00 m 1
10,807.50
9 Metalstud 76x33 mm,t = 0,45 mm 1.00 m 1
11,000.00
10 Metalstud 100x33 mm,t = 0,45 mm 1.00 m1 14,382.50
11 U.Ranner 51x33 mm,t = 0,45 mm 1.00 m 1
8,800.00
12 U.Ranner 65x33 mm,t = 0,45 mm 1.00 m 1
9,955.00
13 U.Ranner 77x33 mm,t = 0,45 mm 1.00 m1 10,450.00
14 U.Ranner 101x33 mm,t = 0,45 mm 1.00 m 1
12,347.50
15 Calsiboard t = 6 mm 1.00 m 2
21,450.00
16 Sekrup Calsiboard 1.00 bh 82.50
17 Rangka hollow 1.00 m2 19,250.00
18 Join Tape + komponen Calsiboard 1.00 m 2
5,500.00
19 Plamur permukaan Calsiboard 1.00 m 2
2,750.00
20 Gypsum board 600x1200x9 mm Ex Jayaboard 1.00 m2 23,650.00
21 Rangka Hollow + penggantung 1.00 m 2
115,000.00
22 Paku Skrup 1.00 m2 17,000.00
23 Profil Aluminium T 1.00 m2 37,500.00
24 Ramset/Dyna bolt 1.00 m 2
750.00

LAIN - LAIN.
1 Bak teraso 1.00 bh 210,000.00
2 Kunci tanam 1.00 bh 65,000.00
3 Door closer 1.00 bh 350,000.00
4 Rel pintu dorong 1.00 bh 175,000.00
5 Door stop 1.00 bh 27,500.00
6 Kait angin 1.00 bh 12,500.00
7 Engsel pintu 1.00 bh 8,500.00
8 Kunci Slot 1.00 bh 7,500.00
9 Waterstop lebar 150 mm 1.00 m1 65,000.00
10 Lem Vinyl 1.00 kg 14,500.00
11 Paku payung 1.00 m2 17,500.00
12 Kain Sintetis 1.00 m2 35,000.00
13 Waterproofing 1.00 m2 32,500.00
14 Self aditive membrane 1.00 m 2
37,500.00
NURDIN IBRAHIM Harga Peralatan Dan material 7
301160017
15 Clementitious ( bahan additive ) 1.00 m2 37,500.00
16 Papan Nama Proyek ( Uk.1 x 2 m ) + Pondasi 1.00 bh 500,000.00
17 Fleece Tape 1.00 m' 15,000.00
18 Waterproofing with Ultraflex Membrane 1.00 kg 65,000.00
19 Sealant 1.00 m' 13,000.00

SANITAIR.
1 kloset duduk/monoblok Toto Type CW.660J/SW660J 1.00 unit 3,400,000.00
2 kloset jongkok Toto Type CE.6 1.00 unit 505,000.00
3 Urinoir Toto Type U.57 M. 1.00 unit 2,500,000.00
4 Kran dinding Toto Type T.23 B.13 1.00 unit 247,000.00
5 floor drain Toto Type TX 1 BN. 1.00 unit 425,000.00
6 Wastafel Toto Type L.521 V1A 1.00 unit 1,732,000.00
7 Kran Taman Toto Type T.26-13 1.00 unit 334,000.00
8 Kran Kitchen Sink Toto Type T.30 AR.13 V7N. 1.00 unit 408,000.00
9 Penyekat Urinoi Toto Type A.100. 1.00 unit 1,240,000.00
10 kloset jongkok Toto Type CE.9 1.00 unit 732,000.00

NURDIN IBRAHIM Harga Peralatan Dan material 8


301160017
Jumlah Hari & Upah
NO Peralatan / Pekerja PPN
Orang JAM '(Rp/Org/Hr)

11 Paper Holder AW360J 1.00 unit 414,000.00


12 Soap Holder S11N ( 109 x 109 x 59 mm ) 1.00 unit 70,000.00
13 Soap Holder S156N ( 220 x 109 x 58 mm ) 1.00 unit 100,000.00

PIPA.
1 Pipa PVC type AW diameter 1/2" 1.00 m1 13,400.00
2 Pipa PVC type AW diameter 1" 1.00 m 1
20,900.00
3 Pipa PVC type AW diameter 1 1/2" 1.00 m1 24,500.00
4 Pipa PVC type AW diameter 2" 1.00 m 1
29,300.00
5 Pipa PVC type AW diameter 2 1/2" 1.00 m 1
35,000.00
6 Pipa PVC type AW diameter 3" 1.00 m1 45,000.00
7 Pipa PVC type AW diameter 4" 1.00 m 1
57,000.00
8 Pipa beton dia.30 cm - 100 cm 1.00 m 1
125,000.00
9 Pipa beton dia.15 cm - 20 cm 1.00 m1 75,000.00
10 Seal tape 1.00 set 5,000.00
11 Pisher 1.00 bh 2,500.00

KACA.
1 Jendela nako 1.00 bh 15,000.00
2 Kaca polos 1.00 m2 65,000.00
3 Kaca bening t = 3 mm 1.00 m2 65,000.00
4 Kaca bening t = 5 mm 1.00 m 2
85,000.00
5 Kaca bening t = 8 mm 1.00 m2 95,000.00

NURDIN IBRAHIM Harga Peralatan Dan material 9


301160017
SI HARGA PERALATAN &
PAH
ATERIAL. KODE :
: PEB.2018
Biaya Biaya Angkut
(Rp.) '(Rp.)

389,900.00 1,500,000.00

110,000.00
114,000.00
143,000.00
114,000.00
143,000.00
114,000.00
143,000.00
114,000.00
143,000.00
114,000.00
114,000.00
132,000.00
114,000.00
110,000.00
114,000.00
114,000.00
143,000.00
114,000.00
150,000.00
114,000.00
114,000.00
1,500,000.00
1,500,000.00

499.60

611.00
308,000.00
341,000.00
341,000.00
341,000.00
225,000.00
168,320.00
237,800.00

NURDIN IBRAHIM Harga Peralatan Dan material 10


301160017
2,500.00
290,823.00
215,000.00
250,000.00
185,000.00
3,500.00

160,700.00 107.13
106,050.00 70.70
215,300.00 350.00
282,145.00
250,000.00 450.00
25.00
2,500.00

NURDIN IBRAHIM Harga Peralatan Dan material 11


301160017
Biaya Biaya Angkut
(Rp.) '(Rp.)

315,000.00
125,000.00
3,500.00
1,750,000.00
25,000.00
65,000.00
115,000.00

25,000.00
50,000.00
12,500.00
7,500.00
3,500.00
7,500.00
22,500.00
8,500.00
5,000.00
25,000.00
30,500.00
15,000.00
7,500.00
18,500.00
35,000.00
1,000.00
30,500.00

50,000.00
1,200.00
1,800.00
2,250.00
8,000.00
4,545.45
3,000.00
20,875.00
17,500.00
32,083.33
32,083.33
64,166.67
12,323.27
14,747.45
14,464.00
NURDIN IBRAHIM Harga Peralatan Dan material 12
301160017
16,875.00
97,268.50
-

1,362.00
2,182.88
1,700.00
1,700.00
35,000.00
54,000.00

11,040.00
10,925.00
23,100.00
19,360.00

NURDIN IBRAHIM Harga Peralatan Dan material 13


301160017
Biaya Biaya Angkut
(Rp.) '(Rp.)

11,360.00
11,044.00
11,900.00
10,819.00
10,970.00
10,794.00
10,746.00
2,200.00
75,000.00
12,392.00
18,000.00
35,000.00
9,500.00
9,500.00
1,500.00
12,500.00
25,000.00
42,500.00

25,000.00
2,500,000.00
2,650,000.00
1,200,000.00
1,800,000.00
1,850,000.00
2,500.00
1,850,000.00
5,000.00
1,500,000.00
2,000,000.00
1,800,000.00
950,000.00
9,150,000.00 28 btg
6,500,000.00 35 btg
6,500,000.00 28 btg
3,650,000.00 35 btg
3,650,000.00 28 btg
65,000.00

NURDIN IBRAHIM Harga Peralatan Dan material 14


301160017
55,600.00
35,000.00
41,000.00
3,000.00
3,300.00
45,000.00
37,800.00
3,500.00
6,500.00
15,000.00

650,000.00
650,000.00
950,000.00
412,500.00

NURDIN IBRAHIM Harga Peralatan Dan material 15


301160017
Biaya Biaya Angkut
(Rp.) '(Rp.)

825.00
605.00
1,045.00
467.50
1,100.00
110.00
9,625.00
10,807.50
11,000.00
14,382.50
8,800.00
9,955.00
10,450.00
12,347.50
21,450.00
82.50
19,250.00
5,500.00
2,750.00
23,650.00
115,000.00 90,000.00
17,000.00
37,500.00
750.00

210,000.00
65,000.00
350,000.00
175,000.00
27,500.00
12,500.00
8,500.00
7,500.00
65,000.00
14,500.00
17,500.00
35,000.00
32,500.00
37,500.00
NURDIN IBRAHIM Harga Peralatan Dan material 16
301160017
37,500.00
500,000.00
15,000.00
65,000.00
13,000.00

3,400,000.00
505,000.00
2,500,000.00
247,000.00
425,000.00
1,732,000.00
334,000.00
408,000.00
1,240,000.00
732,000.00

NURDIN IBRAHIM Harga Peralatan Dan material 17


301160017
Biaya Biaya Angkut
(Rp.) '(Rp.)

414,000.00
70,000.00
100,000.00

13,400.00
20,900.00
24,500.00
29,300.00
35,000.00
45,000.00
57,000.00
125,000.00
75,000.00
5,000.00
2,500.00

15,000.00
65,000.00
65,000.00
85,000.00
95,000.00

NURDIN IBRAHIM Harga Peralatan Dan material 18


301160017
MENEJEMEN PROYEK
A. HARGA SATUAN PEKERJAAN PERSIAPAN, TANAH, DAN PONDASI JALUR
A.1.4. Pengukuran dan pemasangan 1 m’ Bouwplank
Harga Satuan
No Uraian Kode Satuan
Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.100 110,000.00
Tukang kayu L.02 OH 0.100 114,000.00
Kepala tukang L.03 OH 0.010 143,000.00
Mandor L.04 OH 0.005 132,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu balok 5/7 m3 0.012 19,360.00
Paku 2”-3” Kg 0.020 18,000.00
Kayu papan 3/20 m3 0.007 2,650,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

A.1 (K3) Pemasangan 1 m2 bekisting untuk pondasi


HARGA SATUAN
NO URAIAN PEKERJAAN SATUANSATUANKOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.520 Rp 110,000.00
Tukang kayu L.02 OH 0.260 Rp 114,000.00
Kepala tukang L.03 OH 0.026 Rp 143,000.00
Mandor L.04 OH 0.026 Rp 132,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m
3 0.040 Rp 1,800,000.00
Paku 5 – 10 cm kg 0.300 Rp 16,932.00
Minyak bekisting Liter 0.100 Rp 2,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

A.4.1.1.21 (K3) Pemasangan 1 m2 bekisting untuk sloof


HARGA SATUAN
NO URAIAN PEKERJAAN SATUANSATUANKOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.52 110,000.00
Tukang kayu L.02 OH 0.26 114,000.00
Kepala tukang L.03 OH 0.03 143,000.00
Mandor L.04 OH 0.03 132,000.00

Ferawati Eksan 301160057 Analisa Harga Satuan Pekerjaan Tanah


MENEJEMEN PROYEK
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3 0.05 1,750,000.00
Paku 5 cm – 10 cm kg 0.30 19,360.00
Minyak bekisting Liter 0.10 2,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

A.4.1.1.22 (K3) Pemasangan 1 m2 bekisting untuk kolom


HARGA SATUAN
NO URAIAN PEKERJAAN SATUANSATUANKOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.660 110,000.00
Tukang kayu L.02 OH 0.330 114,000.00
Kepala tukang L.03 OH 0.033 143,000.00
Mandor L.04 OH 0.033 132,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m
3 0.040 1,750,000.00
Paku 5 cm – 12 cm kg 0.400 19,360.00
Minyak bekisting Liter 0.200 2,500.00
Balok kayu kelas II m
3 0.015 Rp 1,800,000.00
Plywood tebal 9 Lbr 0.350 Rp 115,000.00
mm
Dolken kayu  8- Batang 2.000 Rp 25,000.00
10cm –panj 4 m JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

A.4.1.1.23 (K3) Pemasangan 1 m bekisting untuk balok


2

HARGA SATUAN
NO URAIAN PEKERJAAN SATUANSATUANKOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.660 110,000.00
Tukang kayu L.02 OH 0.330 114,000.00
Kepala tukang L.03 OH 0.033 143,000.00
Mandor L.04 OH 0.033 132,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m
3 0.040 1,750,000.00
Paku 5 cm – 12 cm kg 0.400 19,360.00
Minyak bekisting Liter 0.200 2,500.00

Ferawati Eksan 301160057 Analisa Harga Satuan Pekerjaan Tanah


MENEJEMEN PROYEK
Balok kayu kelas II m
3 0.018 Rp 1,800,000.00
Plywood tebal 9 mm Lbr 0.350 Rp 115,000.00
Dolken kayu Batang 2.000 Rp 25,000.00
 (8–10) cm JUMLAH HARGA BAHAN
C panjang 4m
PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

A.4.1.1.26 (K3) Pemasangan 1 m bekisting untuk tangga


2

HARGA SATUAN
NO URAIAN PEKERJAAN SATUANSATUANKOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.660 110,000.00
Tukang kayu L.02 OH 0.330 114,000.00
Kepala tukang L.03 OH 0.033 143,000.00
Mandor L.04 OH 0.033 132,000.00
JUMLAH
B BAHAN TENAGA
KERJA
Kayu kelas III m
3 0.030 1,750,000.00
Paku 5 cm – 12 cm kg 0.400 19,360.00
Minyak bekisting Liter 0.150 2,500.00
Balok kayu kelas II m
3 0.015 Rp 1,800,000.00
Plywood tebal 9 mm Lbr 0.350 Rp 115,000.00
Dolken kayu,  8– Batang 2.000 Rp 25,000.00
10 cm,panjang 4 m JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum)
1 FPenggalian
Harga Satuan
1 mPekerjaan (D+E)
3
tanah biasa sedalam 1 m
HARGA SATUAN
NO URAIAN PEKERJAAN SATUANSATUANKOEFISIEN
(Rp)
A TEBAGA KERJA
Pekerja L. 01 OH 0.75 110,000.00
Mandor L.04 OH 0.03 132,000.00
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA SATUAN


C PERALATAN

JUMLAH HARGA PERALATAN


D JUMLAH (A+B+C)
E Overhead & Profit ( Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

Ferawati Eksan 301160057 Analisa Harga Satuan Pekerjaan Tanah


MENEJEMEN PROYEK
3
galian tanah
HARGA SATUAN
NO URAIAN PEKERJAAN SATUANSATUANKOEFISIEN
(Rp)
A TEBAGA KERJA
Pekerja L. 01 OH 0.50 110,000.00
Mandor L.04 OH 0.05 132,000.00
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA SATUAN


C PERALATAN

JUMLAH HARGA PERALATAN


D JUMLAH (A+B+C)
E Overhead & Profit ( Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)
3
sirtu padat
HARGA SATUAN
NO URAIAN PEKERJAAN SATUANSATUANKOEFISIEN
(Rp)
A TEBAGA KERJA
Pekerja L. 01 OH 0.15 110,000.00
Mandor L.04 OH 0.02 132,000.00
JUMLAH TENAGA KERJA
B BAHAN
Sirtu m3 1.20 237,800.00
JUMLAH HARGA SATUAN
C PERALATAN

JUMLAH HARGA PERALATAN


D JUMLAH (A+B+C)
E Overhead & Profit ( Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

4. Pengurugan 1 m3 dengan pasir urug


HARGA SATUAN
NO URAIAN PEKERJAAN SATUANSATUANKOEFISIEN
(Rp)
A TEBAGA KERJA
Pekerja L. 01 OH 0.30 110,000.00
Mandor L.04 OH 0.01 132,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pasir Urug kg 1,200.00 70.70
JUMLAH HARGA SATUAN
C PERALATAN

JUMLAH HARGA PERALATAN


D JUMLAH (A+B+C)
E Overhead & Profit ( Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

Ferawati Eksan 301160057 Analisa Harga Satuan Pekerjaan Tanah


MENEJEMEN PROYEK
3
batu kosong (anstamping)
HARGA SATUAN
NO URAIAN PEKERJAAN SATUANSATUANKOEFISIEN
(Rp)
A TEBAGA KERJA
Pekerja L. 01 OH 0.78 110,000.00
Tukang batu L. 02 OH 0.39 114,000.00
Kepala Tukang L. 03 OH 0.04 143,000.00
Mandor L.04 OH 0.04 132,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu Belah m3 1.20 225,000.00
Pasir Urug m3 0.43 160,700.00
JUMLAH HARGA SATUAN
C PERALATAN

JUMLAH HARGA PERALATAN


D JUMLAH (A+B+C)
E Overhead & Profit ( Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

6. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3PP


HARGA SATUAN
NO URAIAN PEKERJAAN SATUANSATUANKOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 1.50 110,000.00
Tukang batu L.02 OH 0.75 114,000.00
Kepala tukang L.03 OH 0.08 143,000.00
Mandor L.04 OH 0.08 132,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu belah m3 1.20 225,000.00
Semen Portland Kg 202.00 1,362.00
Pasir pasang m3 0.49 106,050.00
JUMLAH HARGA BAHAN
D JUMLAH (A+B+C)
E Overhead & Profit ( Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

Ferawati Eksan 301160057 Analisa Harga Satuan Pekerjaan Tanah


MENEJEMEN PROYEK

Jumlah Harga
(Rp)

11,000.00
11,400.00
1,430.00
660.00
24,490.00

232.32
360.00
18,550.00
19,142.32

43,632.32
6,544.85
50,177.17

JUMLAH HARGA
(Rp)

Rp 57,200.00
Rp 29,640.00
Rp 3,718.00
Rp 3,432.00
Rp 93,990.00

Rp 72,000.00
Rp 5,079.60
Rp 250.00
Rp 77,329.60

171,319.60
25,697.94
197,017.54

JUMLAH HARGA
(Rp)

57,200.00
29,640.00
3,718.00
3,432.00

Ferawati Eksan 301160057 Analisa Harga Satuan Pekerjaan Tanah


MENEJEMEN PROYEK
93,990.00

78,750.00
5,808.00
250.00
84,808.00

178,798.00
26,819.70
205,617.70

JUMLAH HARGA
(Rp)

72,600.00
37,620.00
4,719.00
4,356.00
119,295.00

70,000.00
7,744.00
500.00
27,000.00
40,250.00
50,000.00
Rp 195,494.00

314,789.00
47,218.35
362,007.35

JUMLAH HARGA
(Rp)

72,600.00
37,620.00
4,719.00
4,356.00
119,295.00

Rp 70,000.00
Rp 7,744.00
Rp 500.00

Ferawati Eksan 301160057 Analisa Harga Satuan Pekerjaan Tanah


MENEJEMEN PROYEK
Rp 32,400.00
Rp 40,250.00
Rp 50,000.00
Rp 200,894.00

205,250.00
30,787.50
236,037.50

JUMLAH HARGA
(Rp)

72,600.00
37,620.00
4,719.00
4,356.00
119,295.00

Rp 52,500.00
Rp 7,744.00
Rp 375.00
Rp 27,000.00
Rp 40,250.00
Rp 50,000.00
Rp 177,869.00

119,295.00
17,894.25
137,189.25

JUMLAH HARGA
(Rp)

82,500.00
3,300.00
85,800.00

85,800.00
12,870.00
98,670.00

Ferawati Eksan 301160057 Analisa Harga Satuan Pekerjaan Tanah


MENEJEMEN PROYEK

JUMLAH HARGA
(Rp)

55,000.00
6,600.00
61,600.00

61,600.00
9,240.00
70,840.00

JUMLAH HARGA
(Rp)

16,500.00
1,980.00
18,480.00

285,360.00
285,360.00

303,840.00
45,576.00
349,416.00

JUMLAH HARGA
(Rp)

33,000.00
1,320.00
34,320.00

84,840.00
84,840.00

119,160.00
17,874.00
137,034.00

Ferawati Eksan 301160057 Analisa Harga Satuan Pekerjaan Tanah


MENEJEMEN PROYEK

JUMLAH HARGA
(Rp)

85,800.00
44,460.00
5,577.00
5,148.00
140,985.00

270,000.00
69,422.40
339,422.40

480,407.40
72,061.11
552,468.51

JUMLAH HARGA
(Rp)

165,000.00
85,500.00
10,725.00
9,900.00

270,000.00
275,124.00
51,434.25
596,558.25
607,283.25
91,092.49
698,375.74

Ferawati Eksan 301160057 Analisa Harga Satuan Pekerjaan Tanah


MENEJEMEN PROYEK

B. PEKERJAAN BETON
1. Membuat 1 m 3 beton mutu f’c = 16,9 Mpa
HARGA SATUAN
NO URAIAN PEKERJAAN KODE SATUAN KOEFISIEN
(Rp)
A TEBAGA KERJA
Pekerja L. 01 OH 1.650 110,000.00
Tukang batu L. 02 OH 0.275 114,000.00
Kepala Tukang L. 03 OH 0.028 143,000.00
Mandor L.04 OH 0.083 132,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen portlan kg 352.000 1,362.00
Pasir Beton kg 731.000 350.00
Krikil kg 1,031.000 450.00
Air Liter 215.000 25.00
JUMLAH HARGA SATUAN
C PERALATAN

JUMLAH HARGA PERALATAN


D JUMLAH (A+B+C)
E Overhead & Profit ( Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

2. Membuat 1 m3 beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm


HARGA SATUAN
NO URAIAN PEKERJAAN KODE SATUAN KOEFISIEN
(Rp)
A TEBAGA KERJA
Pekerja L. 01 OH 1.650 110,000.00
Tukang batu L. 02 OH 0.275 114,000.00
Kepala Tukang L. 03 OH 0.028 143,000.00
Mandor L.04 OH 0.083 132,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen portlan kg 326.000 1,362.00
Pasir Beton m3 760.000 350.00
Krikil m3 1,029.000 450.00
Air Liter 215.000 25.00
JUMLAH HARGA SATUAN
C PERALATAN

JUMLAH HARGA PERALATAN


D JUMLAH (A+B+C)
E Overhead & Profit ( Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

3. Membuat 1 m3 beton mutu f’c = 7,4 Mpa


HARGA SATUAN
NO URAIAN PEKERJAAN KODE SATUAN KOEFISIEN
(Rp)
A TEBAGA KERJA

Nurdin Ibrahim 301160017 Analisa harga satuan Pekerjaan Beton


MENEJEMEN PROYEK

Pekerja L. 01 OH 1.650 110,000.00


Tukang batu L. 02 OH 0.275 114,000.00
Kepala Tukang L. 03 OH 0.028 143,000.00
Mandor L.04 OH 0.083 132,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen portlan kg 194.000 1,362.00
Pasir Beton m3 869.000 350.00
Krikil m3 999.000 450.00
Air Liter 215.000 25.00
JUMLAH HARGA SATUAN
C PERALATAN

JUMLAH HARGA PERALATAN


D JUMLAH (A+B+C)
E Overhead & Profit ( Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

Nurdin Ibrahim 301160017 Analisa harga satuan Pekerjaan Beton


MENEJEMEN PROYEK

JUMLAH HARGA
(Rp)

181,500.00
31,350.00
4,004.00
10,956.00
227,810.00

479,424.00
255,850.00
463,950.00
5,375.00
1,204,599.00

1,432,409.00
214,861.35
1,647,270.35

JUMLAH HARGA
(Rp)

181,500.00
31,350.00
4,004.00
10,956.00
227,810.00

444,012.00
266,000.00
463,050.00
5,375.00
1,178,437.00

1,406,247.00
210,937.05
1,617,184.05

JUMLAH HARGA
(Rp)

Nurdin Ibrahim 301160017 Analisa harga satuan Pekerjaan Beton


MENEJEMEN PROYEK

181,500.00
31,350.00
4,004.00
10,956.00
227,810.00

264,228.00
304,150.00
449,550.00
5,375.00
1,023,303.00

1,251,113.00
187,666.95
1,438,779.95

Nurdin Ibrahim 301160017 Analisa harga satuan Pekerjaan Beton


C PEKERJAAN PASANGAN
1. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP :
HARGA SATUAN
NO URAIAN PEKERJAAN KODE SATUAN KOEFISIEN
(Rp)
A TEBAGA KERJA
Pekerja L. 01 OH 0.600 110,000.00
Tukang Batu L. 02 OH 0.200 114,000.00
Kepala Tukang L. 03 OH 0.020 143,000.00
Mandor L.04 OH 0.030 132,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata Merah Buah 140.000 611.00
Semen portlan kg 32.950 1,362.00
Pasir pasng m3 0.091 70.70
JUMLAH HARGA SATUAN
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH (A+B+C)
E Overhead & Profit ( Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

2. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm


HARGA SATUAN
NO URAIAN PEKERJAAN KODE SATUAN KOEFISIEN
(Rp)
A TEBAGA KERJA
Pekerja L.01 OH 0.300 110,000.00
Tukang batu L.03 OH 0.150 114,000.00
Kepala tukang L.03 OH 0.015 143,000.00
Mandor L.04 OH 0.015 132,000.00
JUMLAH TENAGA KERJA
B BAHAN
PC Kg 7.776 1,362.00
PP m3 0.023 106,050.00
JUMLAH HARGA SATUAN
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH (A+B+C)
E Overhead & Profit ( Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

3. Pemasangan 1 m2 acian
HARGA SATUAN
NO URAIAN PEKERJAAN KODE SATUAN KOEFISIEN
(Rp)
A TEBAGA KERJA
Pekerja L.01 OH 0.200 110,000.00
Tukang batu L.03 OH 0.100 114,000.00
Kepala tukang L.03 OH 0.010 143,000.00
Mandor L.04 OH 0.010 132,000.00
JUMLAH TENAGA KERJA
TENTRI UTAMI DARISE
301160005 Analisa Harga Satuan Pekerjaan Pasangan
B BAHAN
Semen PC Kg 3.250 1,362.00
JUMLAH HARGA SATUAN
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH (A+B+C)
E Overhead & Profit ( Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

TENTRI UTAMI DARISE


301160005 Analisa Harga Satuan Pekerjaan Pasangan
batu campuran 1SP : 3PP
JUMLAH HARGA
(Rp)

66,000.00
22,800.00
2,860.00
3,960.00
95,620.00

85,540.00
44,877.90
6.43
130,424.33

226,044.33
33,906.65
259,950.98

JUMLAH HARGA
(Rp)

33,000.00
17,100.00
2,145.00
1,980.00
54,225.00

10,590.91
2,439.15
13,030.06

67,255.06
10,088.26
77,343.32

JUMLAH HARGA
(Rp)

22,000.00
11,400.00
1,430.00
1,320.00
36,150.00
TENTRI UTAMI DARISE
301160005 Analisa Harga Satuan Pekerjaan Pasangan
4,426.50
4,426.50

40,576.50
6,086.48
46,662.98

TENTRI UTAMI DARISE


301160005 Analisa Harga Satuan Pekerjaan Pasangan
D. PEKERJAAN PINTU, KUSEN JENDELA DAN VENTILASI
1. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II at
HARGA SATUAN
NO URAIAN PEKERJAAN KODE SATUANKOEFISIEN
(Rp)
A TEBAGA KERJA
Pekerja L.01 OH 6.000 110,000.00
Tukang kayu L.03 OH 18.000 114,000.00
Kepala tukang L.03 OH 1.800 143,000.00
Mandor L.04 OH 0.300 132,000.00
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu m3 1.200 1,800,000.00
Paku 10 cm Kg 1.250 19,360.00
Lem kayu Kg 1.000 14,500.00
JUMLAH HARGA SATUAN
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH (A+B+C)
E Overhead & Profit ( Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

2. Pemasangan 1 m2 kaca tebal 5 mm


HARGA SATUAN
NO URAIAN PEKERJAAN KODE SATUANKOEFISIEN
(Rp)
A TEBAGA KERJA
Pekerja L.01 OH 0.015 110,000.00
Tukang kayu L.02 OH 0.150 114,000.00
Kepala tukang L.03 OH 0.015 143,000.00
Mandor L.04 OH 0.001 132,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kaca tebal 5 mm m2 1.100 85,000.00
Sealant Kg 0.050 13,000.00
JUMLAH HARGA SATUAN
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH (A+B+C)
E Overhead & Profit ( Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

3. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu


kelas I atau II HARGA SATUAN
NO URAIAN PEKERJAAN KODE SATUANKOEFISIEN
(Rp)
A TEBAGA KERJA
Pekerja L.01 OH 1.000 110,000.00
Tukang kayu L.03 OH 3.000 114,000.00
Kepala tukang L.03 OH 0.300 143,000.00
Mandor L.04 OH 0.050 132,000.00
JUMLAH TENAGA KERJA

TENTRI UTAMI DARISE Analisa Harga Satuan Pekerjaan Kusen, pintu, Jendela, dan Ventilasi
301160005
B BAHAN
Papan kayu m3 0.064 1,850,000.00
Lem kayu Kg 0.500 14,500.00
JUMLAH HARGA SATUAN
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH (A+B+C)
E Overhead & Profit ( Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

TENTRI UTAMI DARISE Analisa Harga Satuan Pekerjaan Kusen, pintu, Jendela, dan Ventilasi
301160005
4. Pemasangan 1 buah engsel angin
HARGA SATUAN
NO URAIAN PEKERJAAN KODE SATUANKOEFISIEN
(Rp)
A TEBAGA KERJA
Pekerja L.01 OH 0.015 110,000.00
Tukang kayu L.02 OH 0.150 114,000.00
Kepala tukang L.03 OH 0.015 143,000.00
Mandor L.04 OH 0.001 132,000.00
JUMLAH TENAGA KERJA
B BAHAN
Engsel angin buah 1,00 8,500.00
JUMLAH HARGA SATUAN
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH (A+B+C)
E Overhead & Profit ( Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

5. Pemasangan 1 buah kait angin


HARGA SATUAN
NO URAIAN PEKERJAAN KODE SATUANKOEFISIEN
(Rp)
A TEBAGA KERJA
Pekerja L.01 OH 0.015 110,000.00
Tukang kayu L.02 OH 0.150 114,000.00
Kepala tukang L.03 OH 0.015 143,000.00
Mandor L.04 OH 0.008 132,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kait angin buah 1,00 12,500.00
JUMLAH HARGA SATUAN
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH (A+B+C)
E Overhead & Profit ( Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

TENTRI UTAMI DARISE Analisa Harga Satuan Pekerjaan Kusen, pintu, Jendela, dan Ventilasi
301160005
dela, kayu kelas II atau III
JUMLAH HARGA
(Rp)

660,000.00
2,052,000.00
257,400.00
39,600.00
3,009,000.00

2,160,000.00
24,200.00
14,500.00
2,198,700.00

5,207,700.00
781,155.00
5,988,855.00

JUMLAH HARGA
(Rp)

1,650.00
17,100.00
2,145.00
105.60
21,000.60

93,500.00
650.00
94,150.00

115,150.60
17,272.59
132,423.19

yu
JUMLAH HARGA
(Rp)

110,000.00
342,000.00
42,900.00
6,600.00
501,500.00

TENTRI UTAMI DARISE Analisa Harga Satuan Pekerjaan Kusen, pintu, Jendela, dan Ventilasi
301160005
118,400.00
7,250.00
125,650.00

627,150.00
94,072.50
721,222.50

TENTRI UTAMI DARISE Analisa Harga Satuan Pekerjaan Kusen, pintu, Jendela, dan Ventilasi
301160005
JUMLAH HARGA
(Rp)

1,650.00
17,100.00
2,145.00
105.60
21,000.60

8,500.00
8,500.00

29,500.60
4,425.09
33,925.69

JUMLAH HARGA
(Rp)

1,650.00
17,100.00
2,145.00
1,056.00
21,951.00

12,500.00
12,500.00

34,451.00
5,167.65
39,618.65

TENTRI UTAMI DARISE Analisa Harga Satuan Pekerjaan Kusen, pintu, Jendela, dan Ventilasi
301160005
E. PEKERJAAN PENUTUP ATAP DAN FLAFOND
1. Pek. 1M2 Pek. Atap Genteng Metal
HARGA SATUAN
NO URAIAN PEKERJAAN SATUANSATUANKOEFISIEN
(Rp)
A TEBAGA KERJA
Tukang L.01 OH 0.150 130,000.00
Pekerja L.02 OH 0.020 85,000.00
Kepala tukang L.03 OH 0.015 145,000.00
Mandor L.04 OH 0.200 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Genteng metal Lebar 1.600 45,000.00
Dinabol bh 12.000 1,000.00
JUMLAH HARGA SATUAN
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH (A+B+C)
E Overhead & Profit ( Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

2. Memasang 1 m2 rangka langit-langit uk. 60 cm x 60 cm, besi hollow


HARGA SATUAN
NO URAIAN PEKERJAAN SATUANSATUANKOEFISIEN
(Rp)
A TEBAGA KERJA
Pekerja L.01 OH 0.150 110,000.00
tukang kayu L.02 OH 0.250 143,000.00
Kepala tukang L.03 OH 0.025 143,000.00
Mandor L.04 OH 0.008 132,000.00
JUMLAH TENAGA KERJA
B BAHAN
Besi hollow 40 x 40 mm m 1.650 7,500.00
Besi hollow 20 x 20 mm m 2.300 8,750.00
Paku skrup bh 30.000 190.00
JUMLAH HARGA SATUAN
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH (A+B+C)
E Overhead & Profit ( Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

3. LIST PROFIL GYPSUM


HARGA SATUAN
NO URAIAN PEKERJAAN SATUANSATUANKOEFISIEN
(Rp)
A TEBAGA KERJA
Pekerja L.01 OH 0.600 110,000.00
tukang kayu L.02 OH 0.600 143,000.00
Kepala tukang L.03 OH 0.006 143,000.00
Mandor L.04 OH 0.003 132,000.00
JUMLAH TENAGA KERJA
TENTRI UTAMI DARISE
301160005 Analisa Harga Satuan Pekerjaan Penutup Atap dan Plafond
B BAHAN
List profil gypsum m 1.050 7,500.00
tepung gypsum m 0.150 8,750.00
JUMLAH HARGA SATUAN
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH (A+B+C)
E Overhead & Profit ( Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

TENTRI UTAMI DARISE


301160005 Analisa Harga Satuan Pekerjaan Penutup Atap dan Plafond
JUMLAH HARGA
(Rp)

19,500.00
1,700.00
2,175.00
23,000.00
46,375.00

72,000.00
12,000.00
12,000.00

58,375.00
8,756.25
67,131.25

JUMLAH HARGA
(Rp)

16,500.00
35,750.00
3,575.00
990.00
56,815.00

12,375.00
20,125.00
5,700.00
38,200.00

95,015.00
14,252.25
109,267.25

JUMLAH HARGA
(Rp)

66,000.00
85,800.00
858.00
396.00
153,054.00
TENTRI UTAMI DARISE
301160005 Analisa Harga Satuan Pekerjaan Penutup Atap dan Plafond
7,875.00
1,312.50
9,187.50

162,241.50
24,336.23
186,577.73

TENTRI UTAMI DARISE


301160005 Analisa Harga Satuan Pekerjaan Penutup Atap dan Plafond
F. PEKERJAAN LANTAI
1. Pemasangan 1 m’ plint ubin granit ukuran 10 cm x 30 cm
HARGA SATUAN
NO URAIAN PEKERJAAN SATUANSATUANKOEFISIEN
(Rp)
A TEBAGA KERJA
Pekerja L.01 OH 0.090 110,000.00
Tukang batu L.02 OH 0.090 114,000.00
Kepala tukang L.03 OH 0.009 143,000.00
Mandor L.04 OH 0.005 132,000.00
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin granit Bh 3.530 12,323.27
Semen Portland kg 1.140 1,362.00
Semen warna Kg 0.100 1,700.00
Pasir pasang M3 0.003 106,050.00
JUMLAH HARGA SATUAN
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH (A+B+C)
E Overhead & Profit ( Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

2. Pemasangan 1 m2 dinding keramik 20 cm x 20 cm


HARGA SATUAN
NO URAIAN PEKERJAAN SATUANSATUANKOEFISIEN
(Rp)
A TEBAGA KERJA
Pekerja L.01 OH 0.900 110,000.00
Tukang batu L.02 OH 0.450 114,000.00
Kepala tukang L.03 OH 0.045 143,000.00
Mandor L.04 OH 0.045 132,000.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik artistik buah 26.500 1,800.00
Semen Portland Kg 9.300 1,362.00
Pasir pasang M3 0.018 106,050.00
Semen warna Kg 1.940 1,700.00
JUMLAH HARGA SATUAN
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH (A+B+C)
E Overhead & Profit ( Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

3. Pemasangan 1 m2 lantai ubin granit ukuran 40 cm x 40 cm


HARGA SATUAN
NO URAIAN PEKERJAAN SATUANSATUANKOEFISIEN
(Rp)
A TEBAGA KERJA
Pekerja L.01 OH 0.250 110,000.00
Tukang batu L.02 OH 0.125 114,000.00

TENTRI UTAMI DARISE


301160005 Analisa Harga Satuan Pekerjaan Lantai
Kepala tukang L.03 OH 0.013 143,000.00
Mandor L.04 OH 0.013 132,000.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin granit Bh 6.630 14,464.00
Semen Portland kg 9.800 1,362.00
Semen warna Kg 1.300 1,700.00
Pasir pasang M3 0.045 106,050.00
JUMLAH HARGA SATUAN
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH (A+B+C)
E Overhead & Profit ( Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

TENTRI UTAMI DARISE


301160005 Analisa Harga Satuan Pekerjaan Lantai
4. Pemasangan 1m2 lantai keramik ukuran 20 cm x 20 cm
HARGA SATUAN
NO URAIAN PEKERJAAN SATUANSATUANKOEFISIEN
(Rp)
A TEBAGA KERJA
Pekerja L.01 OH 0.700 110,000.00
Tukang batu L.02 OH 0.350 114,000.00
Kepala tukang L.03 OH 0.035 143,000.00
Mandor L.04 OH 0.035 132,000.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin keramik Doos 1.050 12,323.27
Semen Portland Kg 10.400 1,362.00
Pasir pasang M3 0.045 106,050.00
Semen warna Kg 0.500 1,700.00
JUMLAH HARGA SATUAN
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH (A+B+C)
E Overhead & Profit ( Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

TENTRI UTAMI DARISE


301160005 Analisa Harga Satuan Pekerjaan Lantai
JUMLAH HARGA
(Rp)

9,900.00
10,260.00
1,287.00
660.00
22,107.00

43,501.15
1,552.68
170.00
318.15
45,541.98

67,648.98
10,147.35
77,796.33

JUMLAH HARGA
(Rp)

99,000.00
51,300.00
6,435.00
5,940.00
162,675.00

47,700.00
12,666.60
1,908.90
3,298.00
65,573.50

228,248.50
34,237.28
262,485.78

JUMLAH HARGA
(Rp)

27,500.00
14,250.00

TENTRI UTAMI DARISE


301160005 Analisa Harga Satuan Pekerjaan Lantai
1,859.00
1,716.00
45,325.00

95,896.32
13,347.60
2,210.00
4,772.25
116,226.17

161,551.17
24,232.68
185,783.85

TENTRI UTAMI DARISE


301160005 Analisa Harga Satuan Pekerjaan Lantai
JUMLAH HARGA
(Rp)

77,000.00
39,900.00
5,005.00
4,620.00
126,525.00

12,939.44
14,164.80
4,772.25
850.00
32,726.49

159,251.49
23,887.72
183,139.21

TENTRI UTAMI DARISE


301160005 Analisa Harga Satuan Pekerjaan Lantai
G. ANALISA PEKERJAAN INSTALASI LISTRIK
1. Analisa Biaya Pekerjaan Listrik
HARGA SATUAN
NO URAIAN PEKERJAAN SATUANSATUANKOEFISIEN
(Rp)
A TEBAGA KERJA
Tukang listrik L.01 OH 0.480 30,000.00
Pembantu tukang listrik L.02 OH 0.048 40,000.00
Kepala tukang listrik L.03 OH 0.048 45,000.00
Mandor L.04 OH 0.048 50,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kabel listril NYA 3 x 2,5 mm m1 11.000 6,500.00
Instalasi lampu dan stop kontak ttk 1.000 30,000.00
JUMLAH HARGA SATUAN
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH (A+B+C)
E Overhead & Profit ( Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

2. (K3) Pemasangan 1 buah MCB


HARGA SATUAN
NO URAIAN PEKERJAAN SATUANSATUANKOEFISIEN
(Rp)
A TEBAGA KERJA
Upah % 1.000 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa listrik 5/8” btg 3.000 9,000.00
Kabel m 15.000 3,000.00
T Dus buah 1.000 80.00
L Bow buah 2.000 90.00
Klem biasa buah 24.000 900.00
MCB buah 1.000 100,000.00
JUMLAH HARGA SATUAN
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH (A+B+C)
E Overhead & Profit ( Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

3. Pek. Stop Kontak


HARGA SATUAN
NO URAIAN PEKERJAAN SATUANSATUANKOEFISIEN
(Rp)
A TEBAGA KERJA
Tukang listrik L.01 OH 0.200 30,000.00
Pembantu tukang listrik L.02 OH 0.020 40,000.00
Kepala tukang listrik L.03 OH 0.020 45,000.00
Mandor L.04 OH 0.020 50,000.00
JUMLAH TENAGA KERJA
TENTRI UTAMI DARISE
301160005 Analisa harga satuan pekerjaan instalasi listrik
B BAHAN
Stop kontak bh 11.000 12,000.00
JUMLAH HARGA SATUAN
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH (A+B+C)
E Overhead & Profit ( Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

TENTRI UTAMI DARISE


301160005 Analisa harga satuan pekerjaan instalasi listrik
4. Saklar ganda
HARGA SATUAN
NO URAIAN PEKERJAAN SATUANSATUANKOEFISIEN
(Rp)
A TEBAGA KERJA
Tukang listrik L.01 OH 0.400 30,000.00
Pembantu tukang listrik L.02 OH 0.040 40,000.00
Kepala tukang listrik L.03 OH 0.040 45,000.00
Mandor L.04 OH 0.040 50,000.00
JUMLAH TENAGA KERJA
B BAHAN
Saklar ganda bh 1.000 15,500.00
JUMLAH HARGA SATUAN
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH (A+B+C)
E Overhead & Profit ( Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

J. Saklar tunggal
HARGA SATUAN
NO URAIAN PEKERJAAN SATUANSATUANKOEFISIEN
(Rp)
A TEBAGA KERJA
Tukang listrik L.01 OH 0.400 30,000.00
Pembantu tukang listrik L.02 OH 0.040 40,000.00
Kepala tukang listrik L.03 OH 0.040 45,000.00
Mandor L.04 OH 0.040 50,000.00
JUMLAH TENAGA KERJA
B BAHAN
Saklar tunggal bh 1.000 11,000.00
JUMLAH HARGA SATUAN
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH (A+B+C)
E Overhead & Profit ( Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

J. Lampu sl 18 wat
HARGA SATUAN
NO URAIAN PEKERJAAN SATUANSATUANKOEFISIEN
(Rp)
A TEBAGA KERJA
pekerja L.01 OH 0.200 30,000.00
Tukang L.02 OH 0.150 40,000.00
Kepala tukang L.03 OH 0.015 45,000.00
Mandor L.04 OH 0.020 50,000.00
JUMLAH TENAGA KERJA
B BAHAN
Lampu 18 wat + peteng bh 1.000 27,000.00
JUMLAH HARGA SATUAN
C PERALATAN
JUMLAH HARGA PERALATAN
TENTRI UTAMI DARISE
301160005 Analisa harga satuan pekerjaan instalasi listrik
D JUMLAH (A+B+C)
E Overhead & Profit ( Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

TENTRI UTAMI DARISE


301160005 Analisa harga satuan pekerjaan instalasi listrik
JUMLAH HARGA
(Rp)

14,400.00
1,920.00
2,160.00
2,400.00
20,880.00

71,500.00
30,000.00
101,500.00

122,380.00
18,357.00
140,737.00

JUMLAH HARGA
(Rp)

110,000.00
110,000.00

27,000.00
45,000.00
80.00
180.00
21,600.00
100,000.00
193,860.00

303,860.00
45,579.00
349,439.00

JUMLAH HARGA
(Rp)

6,000.00
800.00
900.00
1,000.00
8,700.00
TENTRI UTAMI DARISE
301160005 Analisa harga satuan pekerjaan instalasi listrik
132,000.00
132,000.00

140,700.00
21,105.00
161,805.00

TENTRI UTAMI DARISE


301160005 Analisa harga satuan pekerjaan instalasi listrik
JUMLAH HARGA
(Rp)

12,000.00
1,600.00
1,800.00
2,000.00
17,400.00

15,500.00
15,500.00

32,900.00
4,935.00
37,835.00

JUMLAH HARGA
(Rp)

12,000.00
1,600.00
1,800.00
2,000.00
17,400.00

11,000.00
11,000.00

28,400.00
4,260.00
32,660.00

JUMLAH HARGA
(Rp)

6,000.00
6,000.00
675.00
1,000.00
13,675.00

27,000.00
27,000.00

TENTRI UTAMI DARISE


301160005 Analisa harga satuan pekerjaan instalasi listrik
40,675.00
6,101.25
46,776.25

TENTRI UTAMI DARISE


301160005 Analisa harga satuan pekerjaan instalasi listrik
H. Pekerjaan Senitar
1. (K3) Pemasangan 1 buah wastafel
HARGA SATUAN
NO URAIAN PEKERJAAN SATUANSATUANKOEFISIEN
(Rp)
A TEBAGA KERJA
Pekerja L.01 OH 1.200 110,000.00
Tukang batu L.02 OH 1.450 114,000.00
Kepala tukang L.03 OH 0.150 143,000.00
Mandor L.04 OH 0.060 132,000.00
JUMLAH TENAGA KERJA
B BAHAN
Wastafel Unit 1.200 1,732,000.00
Semen Portland Kg 6.000 1,362.00
Pasir pasang M3 0.010 106,050.00
JUMLAH HARGA SATUAN
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH (A+B+C)
E Overhead & Profit ( Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

2. Pemasangan 1 buah closet jongkok teraso


HARGA SATUAN
NO URAIAN PEKERJAAN SATUANSATUANKOEFISIEN
(Rp)
A TEBAGA KERJA
Pekerja L.01 OH 1.000 110,000.00
Tukang batu L.02 OH 1.500 114,000.00
Kepala tukang L.03 OH 0.150 143,000.00
Mandor L.04 OH 0.050 132,000.00
JUMLAH TENAGA KERJA
B BAHAN
Closet jongkok Unit 1.000 505,000.00
Semen Portland Kg 6.000 1,362.00
Pasir pasang M3 0.010 106,050.00
Bata merah buah 7.000 499.60
JUMLAH HARGA SATUAN
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH (A+B+C)
E Overhead & Profit ( Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

3. Pemasangan 1 buah kran diameter ½” atau ¾ ”


HARGA SATUAN
NO URAIAN PEKERJAAN SATUANSATUANKOEFISIEN
(Rp)
A TEBAGA KERJA
Pekerja L.01 OH 0.010 110,000.00
Tukang batu L.02 OH 0.400 114,000.00
Kepala tukang L.03 OH 0.040 143,000.00
Mandor L.04 OH 0.005 132,000.00
TENTRI UTAMI DARISE
301160005 Analisa Harga Satuan Pekerjaan Senitar
JUMLAH TENAGA KERJA
B BAHAN
Kran air M 1.000 247,000.00
Sealtape Buah 0.025 5,000.00
JUMLAH HARGA SATUAN
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH (A+B+C)
E Overhead & Profit ( Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

TENTRI UTAMI DARISE


301160005 Analisa Harga Satuan Pekerjaan Senitar
4. Pemasangan 1 m’ pipa PVC tipe AW diameter ½ ”
HARGA SATUAN
NO URAIAN PEKERJAAN SATUANSATUANKOEFISIEN
(Rp)
A TEBAGA KERJA
Pekerja L.01 OH 0.108 110,000.00
Tukang batu L.02 OH 0.180 114,000.00
Kepala tukang L.03 OH 0.018 143,000.00
Mandor L.04 OH 0.005 132,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 1/2” M 1.200 13,400.00
JUMLAH HARGA SATUAN
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH (A+B+C)
E Overhead & Profit ( Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

5. Pemasangan 1 m’ pipa PVC tipe AW diameter 2”


HARGA SATUAN
NO URAIAN PEKERJAAN SATUANSATUANKOEFISIEN
(Rp)
A TEBAGA KERJA
Pekerja L.01 OH 0.054 110,000.00
Tukang batu L.02 OH 0.090 114,000.00
Kepala tukang L.03 OH 0.009 143,000.00
Mandor L.04 OH 0.003 132,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 2” M 1,20 29,300.00
JUMLAH HARGA SATUAN
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH (A+B+C)
E Overhead & Profit ( Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

6. Pemasangan 1 m’ pipa PVC tipe AW diameter 4”


HARGA SATUAN
NO URAIAN PEKERJAAN SATUANSATUANKOEFISIEN
(Rp)
A TEBAGA KERJA
Pekerja L.01 OH 0.081 110,000.00
Tukang batu L.02 OH 0.135 114,000.00
Kepala tukang L.03 OH 0.014 143,000.00
Mandor L.04 OH 0.004 132,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 3” M 1.200 45,000.00
JUMLAH HARGA SATUAN
C PERALATAN
JUMLAH HARGA PERALATAN

TENTRI UTAMI DARISE


301160005 Analisa Harga Satuan Pekerjaan Senitar
D JUMLAH (A+B+C)
E Overhead & Profit ( Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

TENTRI UTAMI DARISE


301160005 Analisa Harga Satuan Pekerjaan Senitar
JUMLAH HARGA
(Rp)

132,000.00
165,300.00
21,450.00
7,920.00
326,670.00

2,078,400.00
8,172.00
1,060.50
2,087,632.50

2,414,302.50
362,145.38
2,776,447.88

JUMLAH HARGA
(Rp)

110,000.00
171,000.00
21,450.00
6,600.00
309,050.00

505,000.00
8,172.00
1,060.50
3,497.20
517,729.70

826,779.70
124,016.96
950,796.66

JUMLAH HARGA
(Rp)

1,100.00
45,600.00
5,720.00
660.00
TENTRI UTAMI DARISE
301160005 Analisa Harga Satuan Pekerjaan Senitar
53,080.00

247,000.00
125.00
247,125.00

300,205.00
45,030.75
345,235.75

TENTRI UTAMI DARISE


301160005 Analisa Harga Satuan Pekerjaan Senitar
JUMLAH HARGA
(Rp)

11,880.00
20,520.00
2,574.00
660.00
35,634.00

16,080.00
16,080.00

51,714.00
7,757.10
59,471.10

JUMLAH HARGA
(Rp)

5,940.00
10,260.00
1,287.00
396.00
17,883.00

35,160.00
35,160.00

53,043.00
7,956.45
60,999.45

JUMLAH HARGA
(Rp)

8,910.00
15,390.00
1,930.50
528.00
26,758.50

54,000.00
54,000.00

TENTRI UTAMI DARISE


301160005 Analisa Harga Satuan Pekerjaan Senitar
80,758.50
12,113.78
92,872.28

TENTRI UTAMI DARISE


301160005 Analisa Harga Satuan Pekerjaan Senitar
I. PEKERJAAN PENGECETAN
1. Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2
lapis cat penutup) HARGA SATUAN
NO URAIAN PEKERJAAN SATUANSATUANKOEFISIEN
(Rp)
A TEBAGA KERJA
Pekerja L.01 OH 0.020 110,000.00
Tukang cat L.02 OH 0.063 114,000.00
Kepala tukang L.03 OH 0.006 143,000.00
Mandor L.04 OH 0.003 132,000.00
JUMLAH TENAGA KERJA
B BAHAN
Plamuur Kg 0.100 12,500.00
Cat dasar Kg 0.100 25,000.00
Cat penutup Kg 0.260 30,500.00
JUMLAH HARGA SATUAN
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH (A+B+C)
E Overhead & Profit ( Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

2. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau


kelas II HARGA SATUAN
NO URAIAN PEKERJAAN SATUANSATUANKOEFISIEN
(Rp)
A TEBAGA KERJA
Pekerja L.01 OH 0.100 110,000.00
Tukang kayu L.03 OH 0.200 114,000.00
Kepala tukang L.03 OH 0.020 143,000.00
Mandor L.04 OH 0.005 132,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu m3 0.011 1,500,000.00
Paku 5 dan 7 cm kg 0.050 19,360.00
JUMLAH HARGA SATUAN
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH (A+B+C)
E Overhead & Profit ( Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

3. Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2


lapis cat penutup)
HARGA SATUAN
NO URAIAN PEKERJAAN SATUANSATUANKOEFISIEN
(Rp)
A TEBAGA KERJA
Pekerja L.01 OH 0.020 110,000.00
Tukang cat L.02 OH 0.063 114,000.00
Kepala tukang L.03 OH 0.006 143,000.00
Mandor L.04 OH 0.003 132,000.00
JUMLAH TENAGA KERJA
TENTRI UTAMI DARISE
301160005 Analisa Harga Satuan Pekerjaan Pengecetan
B BAHAN
Plamuur Kg 0.100 12,500.00
Cat dasar Kg 0.100 25,000.00
Cat penutup Kg 0.260 30,500.00
JUMLAH HARGA SATUAN
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH (A+B+C)
E Overhead & Profit ( Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

TENTRI UTAMI DARISE


301160005 Analisa Harga Satuan Pekerjaan Pengecetan
2
JUMLAH HARGA
(Rp)

2,200.00
7,182.00
900.90
396.00
10,678.90

1,250.00
2,500.00
7,930.00
11,680.00

PERALATAN
22,358.90
3,353.84
25,712.74

JUMLAH HARGA
(Rp)

11,000.00
22,800.00
2,860.00
660.00
37,320.00

16,500.00
968.00
17,468.00

PERALATAN
54,788.00
8,218.20
63,006.20

JUMLAH HARGA
(Rp)

2,200.00
7,182.00
900.90
396.00
10,678.90
TENTRI UTAMI DARISE
301160005 Analisa Harga Satuan Pekerjaan Pengecetan
1,250.00
2,500.00
7,930.00
11,680.00

22,358.90
3,353.84
25,712.74

TENTRI UTAMI DARISE


301160005 Analisa Harga Satuan Pekerjaan Pengecetan
HITUNGAN VOLUME
P LA LB T N PENGU
NO URAIAN PEKERJAAN RANGA VOL SAT.
M¹ M¹ M¹ M¹ N

I. PEKERJAAN PERSIAPAN
1 Pek. Pengukuran Dan Pemasangan Bowplank 81.18 m
Jalur x 39.68 39.68
Jalur Y 41.50 41.50
2 Pek. Bekisting 93.60 M²
Pedestal 0.90 1.47 24.00 31.75
Sloof 81.18 0.30 2.00 48.71 M²
Kolom 0.90 3.65 4.00 13.14
3 Pek. Penyediaan Air & istrik

II. PEKERJAAN GEDUNG LANTAI I


A. PEKERJAAN TANAH
1 Pek. Galian Tanah 125.42 M³
Telapak 1.20 1.20 1.75 24.00 60.48
Jalur x 1 9.40 1.00 0.80 7.52
x2 9.40 1.00 0.80 7.52
x3 3.50 1.00 0.80 2.80
x4 2.30 1.00 0.80 1.84
x5 2.40 1.00 0.80 1.92
x6 1.60 1.00 0.80 1.28
x7 2.88 1.00 0.80 2.30
x8 2.90 1.00 0.80 2.32
x9 5.30 1.00 0.80 4.24
Jalur y 1 10.30 1.00 0.80 8.24
y2 4.90 1.00 0.80 3.92
y3 6.10 1.00 0.80 4.88
y4 6.10 1.00 0.80 4.88
y5 1.50 1.00 0.80 1.20
y6 1.85 1.00 0.80 1.48

NURDIN IBRAHIM 301160017 Hitunagn Volume Pekerjaan 73


y7 2.95 1.00 0.80 2.36
y8 7.80 1.00 0.80 6.24
2 Pek. Urugan Tanah Kembali 75.16 M³
Telapak 1.20 1.20 1.47 24.00 Pedestal 50.80
Jalur 81.18 0.25 0.10 0.50 2.00 24.35

NURDIN IBRAHIM 301160017 Hitunagn Volume Pekerjaan 74


P LA LB T N PENGU
NO URAIAN PEKERJAAN RANGA VOL SAT.
M¹ M¹ M¹ M¹ N
3 Pek. Urugan Tanah Padat 59.61 M³
Toko 4.25 3.00 0.55 7.01
kamar Tidur 1 3.00 2.27 0.55 3.75
kamar Tidur 2 1.50 3.50 0.55 2.89
Ruang tamu 3.50 3.50 0.55 6.74
WC 1 4.00 2.00 0.55 4.40
WC 2 +Ruang ganti 3.00 2.00 0.55 3.30
Taman 3.00 2.40 0.55 3.96
Ruang makan 4.25 4.50 0.55 10.52
Ruang keluarga 5.90 3.50 0.55 11.36
Dapur 4.50 2.30 0.55 5.69
4 Pek. Urugan Pasir Di bawah Pondasi 6.61 M³
Telapak 1.20 1.20 0.08 0.12
Jalur 81.18 1.00 0.08 6.49
5 Pek. Urugan Pasir Dibawah Lantai 8.67 M³
Toko 4.25 3.00 0.08 1.02
kamar Tidur 1 3.00 2.27 0.08 0.54
kamar Tidur 2 1.50 3.50 0.08 0.42
Ruang tamu 3.50 3.50 0.08 0.98
WC 1 4.00 2.00 0.08 0.64
WC 2 +Ruang ganti 3.00 2.00 0.08 0.48
Taman 3.00 2.40 0.08 0.58
Ruang makan 4.25 4.50 0.08 1.53
Ruang keluarga 5.90 3.50 0.08 1.65
Dapur 4.50 2.30 0.08 0.83

B. PEKERJAAN PONDASI
Pek. Pile Cab /Pondasi Poer Type P1 Beton Mutu Fc
1 1.20 1.20 0.20 24.00 6.91 M³
=19,3
Pek. Mpa
Sek poer /Kolom Pedestal K1 Beton Mutu Fc
2 0.30 0.15 1.47 24.00 1.59 M³
=19,3 Mpa
3 Pek. Anstamping Batu Belah 81.18 1.00 0.20 16.24 M³
4 Pek. Pondasi Batu Belah Sp. 1 4 81.18 0.30 0.80 0.80 45.46 M³

NURDIN IBRAHIM 301160017 Hitunagn Volume Pekerjaan 75


C. PEKERJAAN BETON
Pek. Sloof Beton Bertulang S1 Beton Mutu Fc
1 81.18 0.15 0.30 3.65 M³
=16,9Mps
Pek. Kolom Beton Bertulang K1 Beton mutu Fc
2 3.65 0.15 0.30 0.16 M³
=16,9Mps
Pek. Kolom Beton Bertulang K2 Beton mutu Fc
3 3.65 0.12 0.20 0.09 M³
=16,9Mps
Pek. Kolom Praktis Beton Bertulang KP Beton mutu Fc
4 3.65 0.12 0.15 0.07 M³
=14,5 Mps

NURDIN IBRAHIM 301160017 Hitunagn Volume Pekerjaan 76


P LA LB T N PENGU
NO URAIAN PEKERJAAN RANGA VOL SAT.
M¹ M¹ M¹ M¹ N
Pek. Balok Beton bertulang 15x30 Beton mutu Fc
5 5.11 M³
=14,5 Mps
y 64.50 0.15 0.30 2.90 M³
x 49.13 0.15 0.30 2.21 M³
Pek. Balok beton Bertulang 12x20 Beton mutu Fc
6 10.00 0.12 0.20 0.24 M³
=16,9,3
Pek. Mps
Balok Beton Bertulang 12x15 Beton mutu Fc
7 29.83 0.12 0.15 0.54 M³
=16,9 Mps
Pek. Balok Beton Bertulang 12x10 Beton mutu Fc
8 23.55 0.20 0.10 0.47 M³
=16,9 Mps
9 Pek. Plat Beton Bertulang Beton Mute Fc = 16,9 Mpa 10.84 M³
Toko 4.25 3.00 0.10 1.28
kamar Tidur 1 3.00 2.27 0.10 0.68
kamar Tidur 2 1.50 3.50 0.10 0.53
Ruang tamu 3.50 3.50 0.10 1.23
WC 1 4.00 2.00 0.10 0.80
WC 2 +Ruang ganti 3.00 2.00 0.10 0.60
Taman 3.00 2.40 0.10 0.72
Ruang makan 4.25 4.50 0.10 1.91
Ruang keluarga 5.90 3.50 0.10 2.07
Dapur 4.50 2.30 0.10 1.04
Pek. Tangga Beton Bertulag Beton Mutu Fc =14,5
10 1.42 M³
Mpa
Segitiga 1.00 0.30 0.22 19.00 0.63
Plat tangga 3.20 1.00 0.10 2.00 0.64
bordes 1.00 1.00 0.15 0.15
11 Pek. Cor Rabat Beton Beton Mutu Fc =7,4 Mpa 8.67 M³
Toko 4.25 3.00 0.08 1.02
kamar Tidur 1 3.00 2.27 0.08 0.54
kamar Tidur 2 1.50 3.50 0.08 0.42
Ruang tamu 3.50 3.50 0.08 0.98
WC 1 4.00 2.00 0.08 0.64
WC 2 +Ruang ganti 3.00 2.00 0.08 0.48
Taman 3.00 2.40 0.08 0.58
Ruang makan 4.25 4.50 0.08 1.53
Ruang keluarga 5.90 3.50 0.08 1.65

NURDIN IBRAHIM 301160017 Hitunagn Volume Pekerjaan 77


Dapur 4.50 2.30 0.08 0.83

NURDIN IBRAHIM 301160017 Hitunagn Volume Pekerjaan 78


P LA LB T N PENGU
NO URAIAN PEKERJAAN RANGA VOL SAT.
M¹ M¹ M¹ M¹ N
D. PEKERJAAN PASANGAN
1 Pek. Pasangan Bata 1/2 Batu Sp. 13 292.92 M²
x1 13.00 3.65 47.45
x2 3.50 3.65 ventlasi 12.38
x3 3.50 3.65 p3 11.00
x4 3.50 3.65 12.78
x5 3.50 3.65 p2 10.79
x6 5.00 3.65 18.25
x7 3.50 3.65 j1 10.45
x8 3.00 3.65 p2 8.96
x9 3.50 3.65 p1 9.06
x 10 3.00 3.65 j1 8.62
y1 3.90 3.65 14.24
y2 2.00 3.65 p3 5.53
y3 9.40 3.65 p1+p2 28.61
y4 4.00 3.65 14.60
y5 2.30 3.65 8.40
y6 1.50 3.65 p3 3.70
y7 4.25 3.65 15.51
y8 6.55 3.65 j3 + p2 20.49
y9 8.80 3.65 32.12
Pengurangan p1 1.72 2.16 3.72
p2 0.92 2.16 1.99
p3 0.82 2.16 1.77
j1 1.28 1.82 2.33
j2 0.92 2.64 2.43
j3 1.28 1.12 1.43
v 0.72 0.55 0.40
3 Pek. Plesteran Diding + Beton SP. 13 567.60 M²
x1 13.00 3.65 2.00 94.90
x2 3.50 3.65 2.00 ventlasi 24.76
x3 3.50 3.65 2.00 p3 22.01
NURDIN IBRAHIM 301160017 Hitunagn Volume Pekerjaan 79
x4 3.50 3.65 2.00 25.55
x5 3.50 3.65 2.00 p2 21.58
x6 5.00 3.65 2.00 18.25

NURDIN IBRAHIM 301160017 Hitunagn Volume Pekerjaan 80


P LA LB T N PENGU
NO URAIAN PEKERJAAN RANGA VOL SAT.
M¹ M¹ M¹ M¹ N
x7 3.50 3.65 2.00 j1 20.89
x8 3.00 3.65 2.00 p2 17.93
x9 3.50 3.65 2.00 p1 18.12
x 10 3.00 3.65 2.00 j1 17.24
y1 3.90 3.65 2.00 28.47
y2 2.00 3.65 2.00 p3 11.06
y3 9.40 3.65 2.00 p1+p2 57.22
y4 4.00 3.65 2.00 29.20
y5 2.30 3.65 2.00 16.79
y6 1.50 3.65 2.00 p3 7.41
y7 4.25 3.65 2.00 31.03
y8 6.55 3.65 2.00 j3 + p2 40.97
y9 8.80 3.65 2.00 64.24
5 Pek. Acian 567.60 M²

PEKERJAAN KUNSEN, PINTU, JENDELA,


E.
PENTILASI
1 Pek. Kunsen Kayu klas II 0.33 M³
PJ 1 10.12 0.12 0.06 0.07
PJ 2 7.92 0.12 0.06 0.06
P1 5.92 0.12 0.06 0.04
P2 5.12 0.12 0.06 0.04
P3 5.12 0.12 0.06 0.04
J1 7.86 0.12 0.06 0.06
J3 4.04 0.12 0.06 0.03
2 Pek. Kaca Bening T=5mm 6.49 M²
PJ 1 0.52 1.52 2.00 1.58
PJ 2 0.52 1.52 0.79
J1 0.52 1.52 4.00 3.16
J3 0.52 0.92 2.00 0.96
3 Pek. Bingkai Pintu, Jendela & Ventilasi 19.55 M²
PJ 1 1.60 2.10 2.00 3.36 M²
PJ 2 0.82 2.10 1.72

NURDIN IBRAHIM 301160017 Hitunagn Volume Pekerjaan 81


P 1 1.60 2.10 4.00 3.36
P 2 1.60 2.10 4.00 3.36
P 3 1.60 2.10 4.00 3.36
J 1 4.68 0.80 4.00 3.74
J 3 0.80 0.80 2.00 0.64

NURDIN IBRAHIM 301160017 Hitunagn Volume Pekerjaan 82


P LA LB T N PENGU
NO URAIAN PEKERJAAN RANGA VOL SAT.
M¹ M¹ M¹ M¹ N

4 Pek. Engsel Jendela 40.00 LS


5 Pek. Kait Angin 34.00 LS
7 Pek. Grndel 17.00 LS
11 Pek. Pintu Allimonium P3 KM/WC 2.00 LS

F. PEKERJAAN PENUTUP ATAP DAN FLAFOND


Pek. Rangka Plafond Besi Hollow + Flafond Gypsum
1 112.14 M²
T=9mm
Toko 4.25 3.00 12.75
kamar Tidur 1 3.00 2.27 6.81
kamar Tidur 2 1.50 3.50 5.25
Ruang tamu 3.50 3.50 12.25
WC 1 4.00 2.00 8.00
WC 2 +Ruang ganti 3.00 2.00 6.00
Taman 3.00 2.40 7.20
Ruang makan 4.25 4.50 19.13
Ruang keluarga 5.90 3.50 20.65
Dapur 4.50 2.30 10.35
Teras 1.50 2.50 3.75
2 Pek. List Profil Gypsum 64.83 M

G. PEKERJAAN LANTAI
1 Pek. Lantai Granito 40cm x 40cm 98.14 M²
Toko 4.25 3.00 12.75
kamar Tidur 1 3.00 2.27 6.81
kamar Tidur 2 1.50 3.50 5.25
Ruang tamu 3.50 3.50 12.25
Taman 3.00 2.40 7.20
Ruang makan 4.25 4.50 19.13
Ruang keluarga 5.90 3.50 20.65
Dapur 4.50 2.30 10.35
Teras 1.50 2.50 3.75

NURDIN IBRAHIM 301160017 Hitunagn Volume Pekerjaan 83


2 Pek. Lantai Kramik 20cm x 20cm (Anti Sleep) 14.00 M²
WC 1 4.00 2.00 8.00
WC 2 +Ruang ganti 3.00 2.00 6.00
3 Pek. Dinding Kramik 20cm x 30cm 7.60 1.20 9.12 M²
4 Pek. List Kramik 10cm x 40cm 64.83 0.10 6.48 M²

NURDIN IBRAHIM 301160017 Hitunagn Volume Pekerjaan 84


P LA LB T N PENGU
NO URAIAN PEKERJAAN RANGA VOL SAT.
M¹ M¹ M¹ M¹ N
H. PEKERJAAN INSTALASI LISTRIK
1 Pas, Box Panel + MCB + Lampu Kontrol 2 Fase 1.00 LS
2 Pek. Instalasi listrik 78.00 M
3 Pas. Saklar Tunggal (Panasonik) 5.00 LS
4 Pas. Saklar Ganada (Panasonik) 5.00 LS
5 Pas. Stop Kontak (Panasonik) 4.00 LS
6 Pas. Lampu LED 13 Watt (Philips) + Peteng 17.00 LS

I. PEKERJAAN SANITAR
1 Pas. Wastafel (Lengkap Accessories) 1.00 LS
2 Pas. Kloset Jongkok 2.00 LS
4 Pas. Mata Kran Stenlis 4.00 LS
5 Pek. Sepctitank + Resapan
6 Pas. Pipa PVC 1/2 23.45 M
7 Pas. Pipa PVC 2 13.00 M
9 Pas. Pipa PVC 4 11.23 M

J. PEKERJAAN PENGECETAN
Pek. Pengecetan Diding & Beton 567.60 M²
Pek. Pengecetan Plafond Gypsum + Profi Gypsum =
Pek.Lanati + list Profil 98.14 M²

III. PEKERJAAN GEDUNG LANTAI II


A. PEKERJAAN BETON
Pek. Kolom Beton Bertulang K1 Beton mutu Fc
1 0.20 0.12 4.47 17.00 1.82 M³
=19,3Mps
Pek. Kolom Praktis Beton Bertulang KP Beton mutu Fc
2 0.12 0.12 4.47 6.00 0.39 M³
=14,5
Pek. Mps Latey Beton Bertulang BL Beton mutu Fc
Balok
3 81.18 0.10 0.20 1.62 M³
=14,5
Pek. MpsBalok Beton Bertulang RB Beton mutu Fc
Ring
5 81.18 0.15 0.12 1.46 M³
=14,5 Mpa

B. PEKERJAAN PASANGAN
1 Pek. Pasangan Bata 1/2 batu Sp. 15 292.92 M²
x1 13.00 3.65 47.45
x2 3.50 3.65 ventlasi 12.38

NURDIN IBRAHIM 301160017 Hitunagn Volume Pekerjaan 85


x3 3.50 3.65 p3 11.00
x4 3.50 3.65 12.78
x5 3.50 3.65 p2 10.79

NURDIN IBRAHIM 301160017 Hitunagn Volume Pekerjaan 86


P LA LB T N PENGU
NO URAIAN PEKERJAAN RANGA VOL SAT.
M¹ M¹ M¹ M¹ N
x6 5.00 3.65 18.25
x7 3.50 3.65 j1 10.45
x8 3.00 3.65 p2 8.96
x9 3.50 3.65 p1 9.06
x 10 3.00 3.65 j1 8.62
y1 3.90 3.65 14.24
y2 2.00 3.65 p3 5.53
y3 9.40 3.65 p1+p2 28.61
y4 4.00 3.65 14.60
y5 2.30 3.65 8.40
y6 1.50 3.65 p3 3.70
y7 4.25 3.65 15.51
y8 6.55 3.65 j3 + p2 20.49
y9 8.80 3.65 32.12
2 Pek. Plesteran Dinding + Beton Sp. 13 707.32 M²
x1 13.00 4.47 2.00 116.22
x2 3.50 4.47 2.00 ventlasi 30.50
x3 3.50 4.47 2.00 p3 27.75
x4 3.50 4.47 2.00 31.29
x5 3.50 4.47 2.00 p2 27.32
x6 5.00 4.47 2.00 22.35
x7 3.50 4.47 2.00 j1 26.63
x8 3.00 4.47 2.00 p2 22.85
x9 3.50 4.47 2.00 p1 23.86
x 10 3.00 4.47 2.00 j1 22.16
y1 3.90 4.47 2.00 34.87
y2 2.00 4.47 2.00 p3 14.34
y3 9.40 4.47 2.00 p1+p2 72.63
y4 4.00 4.47 2.00 35.76
y5 2.30 4.47 2.00 20.56
y6 1.50 4.47 2.00 p3 9.87
y7 4.25 4.47 2.00 38.00
NURDIN IBRAHIM 301160017 Hitunagn Volume Pekerjaan 87
y8 6.55 4.47 2.00 j3 + p2 51.72
y9 8.80 4.47 2.00 78.67
4 Pek. Acian 707.32 M²

NURDIN IBRAHIM 301160017 Hitunagn Volume Pekerjaan 88


P LA LB T N PENGU
NO URAIAN PEKERJAAN RANGA VOL SAT.
M¹ M¹ M¹ M¹ N
PEKERJAAN KUNSEN, PINTU, Jendela &
C.
Ventilasi
1 Pek. Kunsen Alumonium 0.50 M³
PJ 1 10.21 0.12 0.06 0.07
P 2 5.12 0.12 0.06 4.00 0.15
P 3 5.12 0.12 0.06 0.04
J 1 7.86 0.12 0.06 2.00 0.11
J 2 8.48 0.12 0.06 0.06
J 3 4.04 0.12 0.06 0.03
V 1.60 0.12 0.06 3.00 0.03

2 Pek. Kaca Bening T=5mm 6.30 M²


PJ 1 0.52 1.52 2.00 1.58
J1 0.52 1.52 4.00 3.16
J3 0.52 0.92 2.00 0.96
V 0.60 0.50 2.00 0.60
3 Pek. Bingkai Pintu, Jendela & Ventilasi 2.35 M³
PJ 1 1.60 2.10 0.04 0.13
P 1 1.60 2.10 0.04 0.13
P 2 1.60 2.10 0.04 4.00 0.54
P 3 1.60 2.10 0.04 0.13
J 1 4.68 0.80 0.04 8.00 1.20
J 3 3.28 0.80 0.04 2.00 0.21
4 Pek. Engsel Jendela 40.00 LS
5 Pek. Kait Angin 34.00 LS
7 Pek. Grndel 17.00 LS
12 Pek. Pintu Allimonium P3 KM/WC 1.00 LS

D. PEKERJAAN PENUTUP ATAP DAN FLAFOND


1 Pek. Rangka Atap Baja Ringan + Atap Sandek 114.15 M²
1- 2.60 10.40 27.04
- 1/2 3.20 1.80 2.88
2- 1.80 1.00 2.40 3.96
NURDIN IBRAHIM 301160017 Hitunagn Volume Pekerjaan 89
3- 4.50 2.50 11.25
- 2.40 4.50 1.00 12.00
4- 29.92
5- 4.00 3.50 14.00

NURDIN IBRAHIM 301160017 Hitunagn Volume Pekerjaan 90


P LA LB T N PENGU
NO URAIAN PEKERJAAN RANGA VOL SAT.
M¹ M¹ M¹ M¹ N
6- 1/2 4.00 1.00 2.00
7- 1/2 6.00 3.70 11.10
2 Pek. Fafon Besi Hollow + Plafond Gypsum T= 9mm = Pek. Lantai 101.89 M²
3 Pek. List Profil Gypsum 64.83 M

E. PEKERJAAN LANTAI
1 Pek. Lantai Granito 40cm x 40cm 98.14 M²
Toko 4.25 3.00 12.75
kamar Tidur 1 3.00 2.27 6.81
kamar Tidur 2 1.50 3.50 5.25
Ruang tamu 3.50 3.50 12.25
Taman 3.00 2.40 7.20
Ruang makan 4.25 4.50 19.13
Ruang keluarga 5.90 3.50 20.65
Dapur 4.50 2.30 10.35
Teras 1.50 2.50 3.75
2 Pek. Lantai Kramik 25cm x 25cm (Anti Sleep) 2.25 1.50 3.38 M²
3 Pek. Dinding Kramik 25cm x 30cm 7.10 1.20 8.52 M²
4 Pek. List Kramik 10cm x 40cm 64.83 0.10 6.48 M²

F. PEKERJAAN INSTALASI LISTRIK


1 Pas. Saklar Tunggal (Panasonik) 6.00 LS
3 Pas. Saklar Ganada (Panasonik) 2.00 LS
4 Pas. Stop Kontak (Panasonik) 3.00 LS
5 Pas. Lampu LED 13 Watt (Philips) + Peteng 10.00 LS
6 Pas. Lampu LED 7 Watt (Philips) + Peteng 3.00 LS

G. PEKERJAAN SANITAR
1 Pas. Wastafel Lengkap Acc (Cermin, Kran Air Dll) 1.00 LS
2 Pas. Kloset Jongkok (Lengkap Accessories) 1.00 LS
4 Pas. Mata Kran Stenlis 2.00 LS
5 Pas. Pipa PVC 1/2 22.00 M
NURDIN IBRAHIM 301160017 Hitunagn Volume Pekerjaan 91
6 Pas. Pipa PVC 2 16.00 M
8 Pas. Pipa PVC 4 14.00 M

NURDIN IBRAHIM 301160017 Hitunagn Volume Pekerjaan 92


P LA LB T N PENGU
NO URAIAN PEKERJAAN RANGA VOL SAT.
M¹ M¹ M¹ M¹ N
H. PEKERJAAN PENGECETAN
1 Pek. Pengecetan Diding & Beton 707.32 M²
x1 13.00 4.47 2.00 116.22
x2 3.50 4.47 2.00 ventlasi 30.50
x3 3.50 4.47 2.00 p3 27.75
x4 3.50 4.47 2.00 31.29
x5 3.50 4.47 2.00 p2 27.32
x6 5.00 4.47 2.00 22.35
x7 3.50 4.47 2.00 j1 26.63
x8 3.00 4.47 2.00 p2 22.85
x9 3.50 4.47 2.00 p1 23.86
x 10 3.00 4.47 2.00 j1 22.16
y1 3.90 4.47 2.00 34.87
y2 2.00 4.47 2.00 p3 14.34
y3 9.40 4.47 2.00 p1+p2 72.63
y4 4.00 4.47 2.00 35.76
y5 2.30 4.47 2.00 20.56
y6 1.50 4.47 2.00 p3 9.87
y7 4.25 4.47 2.00 38.00
y8 6.55 4.47 2.00 j3 + p2 51.72
y9 8.80 4.47 2.00 78.67
2 Pek. Pengecetan Plafond Gypsum + Profi Gypsum 98.14 M²
Toko 4.25 3.00 12.75
kamar Tidur 1 3.00 2.27 6.81
kamar Tidur 2 1.50 3.50 5.25
Ruang tamu 3.50 3.50 12.25
Taman 3.00 2.40 7.20
Ruang makan 4.25 4.50 19.13
Ruang keluarga 5.90 3.50 20.65
Dapur 4.50 2.30 10.35
Teras 1.50 2.50 3.75
CW 2.25 1.50 3.38 M²
NURDIN IBRAHIM 301160017 Hitunagn Volume Pekerjaan 93
FORMULA

NURDIN IBRAHIM 301160017 Hitunagn Volume Pekerjaan 94


(P.L.T)-0,13

NURDIN IBRAHIM 301160017 Hitunagn Volume Pekerjaan 95


FORMULA

NURDIN IBRAHIM 301160017 Hitunagn Volume Pekerjaan 96


NURDIN IBRAHIM 301160017 Hitunagn Volume Pekerjaan 97
FORMULA

1/2.L.T.P.N
P.L.T.N
P.L.T.N

P.L.T
P.L.T
P.L.T
P.L.T
P.L.T
P.L.T
P.L.T
P.L.T
P.L.T

NURDIN IBRAHIM 301160017 Hitunagn Volume Pekerjaan 98


P.L.T

NURDIN IBRAHIM 301160017 Hitunagn Volume Pekerjaan 99


FORMULA

(P.L)-PR
(P.L)-PR

(P.L)-PR

(P.L)-PR
(P.L)-PR
(P.L)-PR
(P.L)-PR

(P.L)-PR
(P.L)-PR
P.T
P.T
(P.L)-PR
P.L
(P.L)-PR
P.T
P.T
P.T
P.T
P.T
P.T
P.T
P.T

P.L.N
((P.L)-PR)*N
((P.L)-PR)*N
NURDIN IBRAHIM 301160017 Hitunagn Volume Pekerjaan 100
P.L.N
((P.L)-PR)*N
P.L.N

NURDIN IBRAHIM 301160017 Hitunagn Volume Pekerjaan 101


FORMULA

((P.L)-PR)*N
((P.L)-PR)*N
((P.L)-PR)*N
((P.L)-PR)*N
P.L.N
((P.L)-PR)*N
((P.L)-PR)*N
P.L.N
P.L.N
((P.L)-PR)*N
P.L.N
((P.L)-PR)*N

P.L.T
P.L.T
P.L.T
P.L.T
P.L.T
P.L.T
P.L.T

P.L.N
P.L
P.L.N
P.L.N

P.L.T
P.L.T

NURDIN IBRAHIM 301160017 Hitunagn Volume Pekerjaan 102


P.L.T
P.L.T
P.L.T
P.L.T
P.L.T

NURDIN IBRAHIM 301160017 Hitunagn Volume Pekerjaan 103


FORMULA

P.L
P.L
P.L
P.L
P.L
P.L
P.L
P.L
P.L
P.L
P.L

P.L
P.L
P.L
P.L
P.L
P.L
P.L
P.L

NURDIN IBRAHIM 301160017 Hitunagn Volume Pekerjaan 104


P.L
P.L
P.T
P.T

NURDIN IBRAHIM 301160017 Hitunagn Volume Pekerjaan 105


FORMULA

PekPlesteran

P.L.T.N
P.L.T.N
P.L.T
P.L.T

(P.L)-PR

NURDIN IBRAHIM 301160017 Hitunagn Volume Pekerjaan 106


(P.L)-PR

(P.L)-PR

NURDIN IBRAHIM 301160017 Hitunagn Volume Pekerjaan 107


FORMULA

(P.L)-PR
(P.L)-PR
(P.L)-PR
(P.L)-PR

(P.L)-PR
(P.L)-PR
P.T
P.T
(P.L)-PR
P.L
(P.L)-PR
P.T

P.L.N
((P.L)-PR)*N
((P.L)-PR)*N
P.L.N
((P.L)-PR)*N
P.L.N
((P.L)-PR)*N
((P.L)-PR)*N
((P.L)-PR)*N
((P.L)-PR)*N
P.L.N
((P.L)-PR)*N
((P.L)-PR)*N
P.L.N
P.L.N
((P.L)-PR)*N
P.L.N
NURDIN IBRAHIM 301160017 Hitunagn Volume Pekerjaan 108
((P.L)-PR)*N

NURDIN IBRAHIM 301160017 Hitunagn Volume Pekerjaan 109


FORMULA

P.L.T

P.L.T.N
P.L.T
P.L.T.N
P.L.T
P.L.T
P.L.T.N

P.L.N
P.L.N
P.L.N
P.L.N

P.L.T
P.L.T
P.L.T.N
P.L.T
P.L.T.N
P.L.T.N

NURDIN IBRAHIM 301160017 Hitunagn Volume Pekerjaan 110


NURDIN IBRAHIM 301160017 Hitunagn Volume Pekerjaan 111
FORMULA

P.L
P.L
P.L
P.L
P.L
P.L
P.L
P.L
P.L
P.T
P.T
P.T

NURDIN IBRAHIM 301160017 Hitunagn Volume Pekerjaan 112


NURDIN IBRAHIM 301160017 Hitunagn Volume Pekerjaan 113
FORMULA

P.L.N
((P.L)-PR)*N
((P.L)-PR)*N
P.L.N
((P.L)-PR)*N
P.L.N
((P.L)-PR)*N
((P.L)-PR)*N
((P.L)-PR)*N
((P.L)-PR)*N
P.L.N
((P.L)-PR)*N
((P.L)-PR)*N
P.L.N
P.L.N
((P.L)-PR)*N
P.L.N
((P.L)-PR)*N

P.L
P.L
P.L
P.L
P.L
P.L
P.L
P.L
P.L
P.T
NURDIN IBRAHIM 301160017 Hitunagn Volume Pekerjaan 114
HITUNGAN VOLUME PEMBESIAN
Pembesian

JUMLAH TOTAL
PANJANG KUKU
STATIONING BATANG PANJANG
M1 M1 M1 M1
a b c d f=(b+d)*c

PONDASI
Tulangan utama telapk 2.45 32.00 0.01 78.72
Tulanag Utaman Pedestal
Begel

SLOOF
Tulangan Utama Ø16 X1 10.00 13.00 0.01 130.13
2 4.50 13.00 0.01 58.63
3 1.30 13.00 0.01 17.03
4 1.30 13.00 0.01 17.03
5 10.00 13.00 0.01 130.13
6 5.50 13.00 0.01 71.63
7 4.00 13.00 0.01 52.13
8 2.50 13.00 0.01 32.63
9 5.50 13.00 0.01 71.63
10 4.50 13.00 0.01 58.63
11 10.00 13.00 0.01 130.13
Y1 20.00 13.00 0.01 260.13
2 2.75 13.00 0.01 35.88
3 4.00 13.00 0.01 52.13
4 8.25 13.00 0.01 107.38
5 16.00 13.00 0.01 208.13
6 3.50 13.00 0.01 45.63
7 20.00 13.00 0.01 260.13
8 7.80 13.00 0.01 101.53
Begel Ø10 1.12 565.60 0.01 639.13

KOLOM K1
Tulangan utama Ø16 21 7.75 10.00 0.01 1,629.60
Begel Ø10 1.30 813.75 0.01 1,066.01
KOLOM K2
Tulangan utama Ø16 17 3.65 6.00 0.01 21.96
Begel Ø10 1.10 310.25 0.01 344.38
KOLOM K3
Tulangan utama Ø10 20 3.75 4.00 0.01 15.04
Begel Ø6 1.1 375.00 0.01 416.25

Balok latey
Tulangan utama Ø10 2 141.40 4.00 0.01 1,131.28
Begel Ø6 2 0.55 707.00 0.01 791.84

Ring Balok
Tulangan utama Ø10 2 141.40 4.00 0.01 1,131.28
Begel Ø6 2 0.80 707.00 0.01 1,145.34

JUMLAH TOTAL BERAT BETON


BERAT
BERAT
JENIS
TOTAL
BESI/1m
Kg Kg
e g=f*e

Jumlah= 3,259.63
1.557 202.612
1.557 91.287
1.557 26.516
1.557 26.516
1.557 202.612
1.557 111.528
1.557 81.166
1.557 50.805
1.557 111.528
1.557 91.287
1.557 202.612
1.557 405.022
1.557 55.865
1.557 81.166
1.557 167.191
1.557 324.058
1.557 71.046
1.557 405.022
1.557 158.082
0.616 393.703

Jumlah= ###
1.557 2,537.287
0.616 656.664
Jumlah= 246.328
1.557 34.192
0.616 212.137
Jumlah= 101.543
0.6166666667 9.275
0.2216666667 92.269

Jumlah= 873.147
0.6166666667 697.623
0.2216666667 175.525

Jumlah= ###
1.557 1,761.403
0.616 705.529

###
KURVA S (TIME SCHEDULE)
180 hari kerja

BOBO BULAN 1 BULAN 2 BULAN 3


NO URAIAN PEKERJAAN T
% M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3

I. PEKERJAAN PERSIAPAN
1 Pek. Pengukuran Dan Pemasangan Bowplank 0.59 ###
2 Pek. Bekisting 2.67 1.33 1.33 Cha
3 Pek. Penyediaan Air & istrik -

II. PEKERJAAN GEDUNG LANTAI I


A. PEKERJAAN TANAH
1 Pek. Galian Tanah 1.79 ### ### ###
2 Pek. Urugan Tanah Kembali 0.77 ### ###
3 Pek. Urugan Tanah Padat 3.01 1.51 1.51
4 Pek. Urugan Pasir Di bawah Pondasi 0.13 ### ### ### ###
5 Pek. Urugan Pasir Dibawah Lantai 0.17 0.09 0.09

B. PEKERJAAN PONDASI
Pek. Pile Cab /Pondasi Poer Type P1 Beton Mutu Fc
1 1.65 ### ### 0.55
=16,9
Pek. Mpa
Sek poer /Kolom Pedestal K1 Beton Mutu Fc =16,9
2 0.38 ### ### 0.13
Mpa
3 Pek. Anstamping Batu Belah 1.30 ### ### ###
4 Pek. Pondasi Batu Belah Sp. 1 4 4.59 ### 1.53 1.53

C. PEKERJAAN BETON
1 Pek. Sloof Beton Bertulang S1 Beton Mutu Fc =16,9Mps 0.87 0.43 0.43
2 Pek. Sloof Beton Bertulang S2 Beton mutu Fc =14,5Mps 0.04 0.04
Pek. Kolom Beton Bertulang K2 Beton mutu Fc
3 0.02 0.01 0.01
=16,9Mps
Pek. Kolom Praktis Beton Bertulang KP Beton mutu Fc
4 0.02
=14,5 Mps Beton bertulang 15x30 Beton mutu Fc =14,5
Pek. Balok
5 1.20 0.40
Mps
Pek. Balok beton Bertulang 12x20 Beton mutu Fc
6 0.06 0.03
=16,9,3 Mps
Pek. Balok Beton Bertulang 12x15 Beton mutu Fc =16,9
7 0.13 0.06 0.06
Mps
Pek. Balok Beton Bertulang 12x10 Beton mutu Fc =16,9
8 0.11 0.11
Mps
KURVA S (TIME SCHDULE)
9 Pek. Plat Beton Bertulang Beton Mute Fc = 16,9 Mpa 2.58
10 Pek. Tangga Beton Bertulag Beton Mutu Fc =14,5 Mpa 0.33
11 Pek. Cor Rabat Beton Beton Mutu Fc =7,4 Mpa 1.80 0.90 0.90

D. PEKERJAAN PASANGAN
1 Pek. Pasangan Bata 1/2 Batu Sp. 13 ### 2.75 2.75 2.75
3 Pek. Plesteran Diding + Beton SP. 13 6.35 1.59 1.59
5 Pek. Acian 3.83 0.96 0.96

E. PEKERJAAN KUNSEN, PINTU, JENDELA, PENTILASI


1 Pek. Kunsen Kayu klas II 0.29
2 Pek. Kaca Bening T=5mm 0.12
3 Pek. Bingkai Pintu, Jendela & Ventilasi 2.04
4 Pek. Engsel Jendela 0.20
5 Pek. Kait Angin 0.19
7 Pek. Grndel 0.08
11 Pek. Pintu Allimonium P3 KM/WC 0.04

F. PEKERJAAN PENUTUP ATAP DAN FLAFOND


Pek. Rangka Plafond Besi Hollow + Flafond Gypsum
1 1.77
T=9mm
2 Pek. List Profil Gypsum 1.75

G. PEKERJAAN LANTAI
1 Pek. Lantai Granito 40cm x 40cm 2.64
2 Pek. Lantai Kramik 20cm x 20cm (Anti Sleep) 0.53
3 Pek. Dinding Kramik 20cm x 30cm 0.35
4 Pek. List Kramik 10cm x 40cm 0.07

H. PEKERJAAN INSTALASI LISTRIK


1 Pas, Box Panel + MCB + Lampu Kontrol 2 Fase 0.05
2 Pek. Instalasi listrik 1.59
3 Pas. Saklar Tunggal (Panasonik) 0.02
4 Pas. Saklar Ganada (Panasonik) 0.03
5 Pas. Stop Kontak (Panasonik) 0.09

KURVA S (TIME SCHDULE)


6 Pas. Lampu LED 13 Watt (Philips) + Peteng 0.11

I. PEKERJAAN SANITAR
1 Pas. Wastafel (Lengkap Accessories) 0.40
2 Pas. Kloset Duduk (Lengkap Accessories) 0.27
4 Pas. Mata Kran Stenlis 0.20
6 Pas. Pipa PVC 1/2 0.20
7 Pas. Pipa PVC 2 0.11
9 Pas. Pipa PVC 4 0.15

J. PEKERJAAN PENGECETAN
Pek. Pengecetan Diding & Beton 2.11
Pek. Pengecetan Plafond Gypsum + Profi Gypsum 0.36

III. PEKERJAAN GEDUNG LANTAI II


A. PEKERJAAN BETON
Pek. Kolom Beton Bertulang K1 Beton mutu Fc
1 0.43
=16,9Mps
Pek. Kolom Praktis Beton Bertulang KP Beton mutu Fc
2 0.09
=14,5 Mps Latey Beton Bertulang BL Beton mutu Fc
Pek. Balok
3 0.38
=14,5
Pek. MpsBalok Beton Bertulang RB Beton mutu Fc
Ring
5 0.34
=14,5 Mpa

B. PEKERJAAN PASANGAN
1 Pek. Pasangan Bata 1/2 batu Sp. 15 ###
2 Pek. Plesteran Dinding + Beton Sp. 13 7.91
4 Pek. Acian 4.77

C. PEKERJAAN KUNSEN, PINTU, Jendela & Ventilasi


1 Pek. Kunsen kayu klas II 0.43
2 Pek. Kaca Bening T=5mm 0.12
3 Pek. Bingkai Pintu, Jendela & Ventilasi 0.24
4 Pek. Engsel Jendela 0.20
5 Pek. Kait Angin 0.19
7 Pek. Grndel 0.10
12 Pek. Pintu Allimonium P3 KM/WC 0.02

KURVA S (TIME SCHDULE)


D. PEKERJAAN PENUTUP ATAP DAN FLAFOND
1 Pek. Rangka Atap Baja Ringan + Atap Sandek 1.80
2 Pek. Plafon Besi Hollow + Plafond Gypsum T= 9mm 1.61
3 Pek. List Profil Gypsum 1.75

E. PEKERJAAN LANTAI
1 Pek. Lantai Granito 40cm x 40cm 2.64
2 Pek. Lantai Kramik 20cm x 20cm (Anti Sleep) 0.09
3 Pek. Dinding Kramik 20cm x 30cm 0.32
4 Pek. List Kramik 10cm x 40cm 0.07

F. PEKERJAAN INSTALASI LISTRIK


1 Pas. Saklar Tunggal (Panasonik) 0.03
2 Pas. Saklar Ganada (Panasonik) 0.01
3 Pas. Stop Kontak (Panasonik) 0.07
4 Pas. Lampu LED 13 Watt (Philips) + Peteng 0.07
5 Pas. Lampu LED 7 Watt (Philips) + Peteng 0.02

G. PEKERJAAN SANITAR
1 Pas. Wastafel Lengkap Acc (Cermin, Kran Air Dll) 0.40
2 Pas. Kloset Duduk (Lengkap Accessories) 0.14
4 Pas. Mata Kran Stenlis 0.10
5 Pas. Pipa PVC 1/2 0.19
6 Pas. Pipa PVC 2 0.14
8 Pas. Pipa PVC 4 0.19

H. PEKERJAAN PENGECETAN
1 Pek. Pengecetan Diding & Beton 2.63
2 Pek. Pengecetan Plafond Gypsum + Profi Gypsum 0.36
100
RENCANA ### ### ### ### ### 3.71 3.12 1.42 4.56 6.82 6.70
KAMULATIF ### ### ### ### ### ### ### ### ### ### ###

NURDIN IBRAHIM
TUGAS MENEGEMEN PROYEK FAK
301160017 KURVA S (TIME SCHDULE)
NURDIN IBRAHIM
TUGAS MENEGEMEN PROYEK FAK
301160017

KURVA S (TIME SCHDULE)


E)

3 BULAN 4 BULAN 5 BULAN 6


M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4
100

Chart Title

95

90

85

0.01 0.01
0.40 0.40
80
0.03

KURVA S (TIME SCHDULE)


80

1.29 1.29
0.33

75

2.75
1.59 1.59
0.96 0.96

70
0.14 0.14
0.06 0.06
1.02 1.02
0.20
0.06 0.06 0.06
0.03 0.03 0.03
65
0.02 0.02

0.44 0.44 0.44 0.44


0.58 0.58 0.58

60

1.32 1.32
0.53
0.35
0.07

55
0.05
1.59
0.02
P
0.03
0.05 0.05

H
50
KURVA S (TIME SCHDULE)
P
0.06 0.06
H
50

0.20 0.20
0.14 0.14

0.10
0.20
0.10
O
0.06 0.06 45
0.08 0.08

1.05 1.05
0.18 0.18
40

0.43
0.09
0.38
0.34
35

5.50 5.50
7.91
4.77

30
0.21 0.21
0.12
0.24
0.10 0.10
0.10 0.10
0.10 25
0.02

KURVA S (TIME SCHDULE)


25

0.90 0.90
0.80 0.80
1.75
20

2.64
0.09
0.16 0.16
0.07
15

0.01 0.01
0.01 0.01
0.04 0.04
0.03 0.03
0.01 0.01 10

0.40
0.14
0.03 0.03 0.03
0.06 0.06 0.06
5
0.05 0.05 0.05
0.06 0.06 0.06

1.31 1.31
0.18 0.18
0
6.07 4.27 7.74 7.31 ### 8.03 3.89 3.65 2.42 0.20 3.04 2.73
### ### ### ### ### ### ### ### ### ### ### ### ###

FAKULAS TEKNIK UNIVERSITAS GORONTALO


KURVA S (TIME SCHDULE)
FAKULAS TEKNIK UNIVERSITAS GORONTALO

KURVA S (TIME SCHDULE)


RENCANA ANGGARAN BIAYA

NO URAIAN PEKERJAAN VOL SAT.

I. PEKERJAAN PERSIAPAN
1 Pek. Pengukuran Dan Pemasangan Bowplank 81.18 m
2 Pek. Bekisting 93.60 M²
3 Pek. Penyediaan Air & istrik - -

II. PEKERJAAN GEDUNG LANTAI I


A. PEKERJAAN TANAH
1 Pek. Galian Tanah ### M³
2 Pek. Urugan Tanah Kembali 75.16 M³
3 Pek. Urugan Tanah Padat 59.61 M³
4 Pek. Urugan Pasir Di bawah Pondasi 6.61 M³
5 Pek. Urugan Pasir Dibawah Lantai 8.67 M³

B. PEKERJAAN PONDASI
Pek. Pile Cab /Pondasi Poer Type P1 Beton Mutu Fc
1 6.91 M³
=16,9
Pek. Mpa
Sek poer /Kolom Pedestal K1 Beton Mutu Fc
2 1.59 M³
=16,9 Mpa
3 Pek. Anstamping Batu Belah 16.24 M³
4 Pek. Pondasi Batu Belah Sp. 1 4 45.46 M³

C. PEKERJAAN BETON
Pek. Sloof Beton Bertulang S1 Beton Mutu Fc
1 3.65 M³
=16,9Mps
Pek. Sloof Beton Bertulang S2 Beton mutu Fc
2 0.16 M³
=14,5Mps
Pek. Kolom Beton Bertulang K2 Beton mutu Fc
3 0.09 M³
=16,9Mps
Pek. Kolom Praktis Beton Bertulang KP Beton mutu
4 0.07 M³
Fc =14,5
Pek. BalokMps
Beton bertulang 15x30 Beton mutu Fc
5 5.11 M³
=14,5 Mps
Pek. Balok beton Bertulang 12x20 Beton mutu Fc
6 0.24 M³
=16,9,3 Mps
Pek. Balok Beton Bertulang 12x15 Beton mutu Fc
7 0.54 M³
=16,9
Pek. Mps Beton Bertulang 12x10 Beton mutu Fc
Balok
8 0.47 M³
=16,9 Mps
9 Pek. Plat Beton Bertulang Beton Mute Fc = 16,9 Mpa 10.84 M³
Pek. Tangga Beton Bertulag Beton Mutu Fc =14,5
10 1.42 M³
Mpa
11 Pek. Cor Rabat Beton Beton Mutu Fc =7,4 Mpa 8.67 M³

D. PEKERJAAN PASANGAN
1 Pek. Pasangan Bata 1/2 Batu Sp. 13 ### M²
3 Pek. Plesteran Diding + Beton SP. 13 ### M²
5 Pek. Acian ### M²

PEKERJAAN KUNSEN, PINTU, JENDELA,


E.
PENTILASI
1 Pek. Kunsen Kayu klas II 0.33 M³
2 Pek. Kaca Bening T=5mm 6.49 M²
3 Pek. Bingkai Pintu, Jendela & Ventilasi 19.55 M²
4 Pek. Engsel Jendela 40.00 LS
5 Pek. Kait Angin 34.00 LS
7 Pek. Grndel 17.00 LS
11 Pek. Pintu Allimonium P3 KM/WC 2.00 LS
NURDIN IBRAHIM 301160017 Rencana anggaran biaya
F. PEKERJAAN PENUTUP ATAP DAN FLAFOND
Pek. Rangka Plafond Besi Hollow + Flafond Gypsum
1 ### M²
T=9mm
2 Pek. List Profil Gypsum 64.83 M

G. PEKERJAAN LANTAI
1 Pek. Lantai Granito 40cm x 40cm 98.14 M²
2 Pek. Lantai Kramik 20cm x 20cm (Anti Sleep) 14.00 M²
3 Pek. Dinding Kramik 20cm x 30cm 9.12 M²
4 Pek. List Kramik 10cm x 40cm 6.48 M²

H. PEKERJAAN INSTALASI LISTRIK


1 Pas, Box Panel + MCB + Lampu Kontrol 2 Fase 1.00 LS
2 Pek. Instalasi listrik 78.00 M
3 Pas. Saklar Tunggal (Panasonik) 5.00 LS
4 Pas. Saklar Ganada (Panasonik) 5.00 LS
5 Pas. Stop Kontak (Panasonik) 4.00 LS
6 Pas. Lampu LED 13 Watt (Philips) + Peteng 17.00 LS

NURDIN IBRAHIM 301160017 Rencana anggaran biaya


NO URAIAN PEKERJAAN VOL SAT.

I. PEKERJAAN SANITAR
1 Pas. Wastafel (Lengkap Accessories) 1.00 LS
2 Pas. Kloset Duduk (Lengkap Accessories) 2.00 LS
4 Pas. Mata Kran Stenlis 4.00 LS
6 Pas. Pipa PVC 1/2 23.45 M
7 Pas. Pipa PVC 2 13.00 M
9 Pas. Pipa PVC 4 11.23 M

J. PEKERJAAN PENGECETAN
Pek. Pengecetan Diding & Beton ### M²
Pek. Pengecetan Plafond Gypsum + Profi Gypsum 98.14 M²

III. PEKERJAAN GEDUNG LANTAI II


A. PEKERJAAN BETON
Pek. Kolom Beton Bertulang K1 Beton mutu Fc
1 1.82 M³
=16,9Mps
Pek. Kolom Praktis Beton Bertulang KP Beton mutu
2 0.39 M³
Fc =14,5
Pek. BalokMps
Latey Beton Bertulang BL Beton mutu Fc
3 1.62 M³
=14,5 Mps
Pek. Ring Balok Beton Bertulang RB Beton mutu Fc
5 1.46 M³
=14,5 Mpa

B. PEKERJAAN PASANGAN
1 Pek. Pasangan Bata 1/2 batu Sp. 15 ###
2 Pek. Plesteran Dinding + Beton Sp. 13 ### M²
4 Pek. Acian ### M²

PEKERJAAN KUNSEN, PINTU, Jendela &


C.
Ventilasi
1 Pek. Kunsen kayu klas II 0.50 M³
2 Pek. Kaca Bening T=5mm 6.30 M²
3 Pek. Bingkai Pintu, Jendela & Ventilasi 2.35 M³
4 Pek. Engsel Jendela 40.00 LS
5 Pek. Kait Angin 34.00 LS
7 Pek. Grndel 17.00 LS
12 Pek. Pintu Allimonium P3 KM/WC 1.00 LS

D. PEKERJAAN PENUTUP ATAP DAN FLAFOND


1 Pek. Rangka Atap Baja Ringan + Atap Sandek ### M²
2 Pek. Plafon Besi Hollow + Plafond Gypsum T= 9mm ### M²
3 Pek. List Profil Gypsum 64.83 M

E. PEKERJAAN LANTAI
1 Pek. Lantai Granito 40cm x 40cm 98.14 M²
2 Pek. Lantai Kramik 20cm x 20cm (Anti Sleep) 3.38 M²
3 Pek. Dinding Kramik 20cm x 30cm 8.52 M²
4 Pek. List Kramik 10cm x 40cm 6.48 M²

F. PEKERJAAN INSTALASI LISTRIK


1 Pas. Saklar Tunggal (Panasonik) 6.00 LS
2 Pas. Saklar Ganada (Panasonik) 2.00 LS
3 Pas. Stop Kontak (Panasonik) 3.00 LS
NURDIN IBRAHIM 301160017 Rencana anggaran biaya
4 Pas. Lampu LED 13 Watt (Philips) + Peteng 10.00 LS
5 Pas. Lampu LED 7 Watt (Philips) + Peteng 3.00 LS

G. PEKERJAAN SANITAR
1 Pas. Wastafel Lengkap Acc (Cermin, Kran Air Dll) 1.00 LS
2 Pas. Kloset Duduk (Lengkap Accessories) 1.00 LS
4 Pas. Mata Kran Stenlis 2.00 LS
5 Pas. Pipa PVC 1/2 22.00 M
6 Pas. Pipa PVC 2 16.00 M
8 Pas. Pipa PVC 4 14.00 M

H. PEKERJAAN PENGECETAN
1 Pek. Pengecetan Diding & Beton ### M²
2 Pek. Pengecetan Plafond Gypsum + Profi Gypsum 98.14 M²

NURDIN IBRAHIM 301160017 Rencana anggaran biaya


N BIAYA

HARGA
HARGA TOTAL
SATUAN

###
Rp 50,177.17 Rp 4,073,382.50
Rp197,017.54 Rp 18,440,841.74
Rp -

###
Rp 98,670.00 Rp 12,375,586.08
Rp 70,840.00 Rp 5,324,136.05
Rp349,416.00 Rp 20,829,299.24
Rp137,034.00 Rp 905,739.93
Rp137,034.00 Rp 1,188,194.41

###
### Rp 11,385,932.66
### Rp 2,615,206.41
Rp552,468.51 Rp 8,969,878.73
Rp698,375.74 Rp 31,748,719.73

###
### Rp 6,017,643.32
### Rp 265,622.48
### Rp 144,300.88
### Rp 106,248.99
### Rp 8,269,228.06
### Rp 395,344.88
### Rp 884,485.34
### Rp 775,864.33
### Rp 17,853,939.69
### Rp 2,291,549.80
### Rp 12,475,373.19

###
Rp259,950.98 Rp 76,145,725.99
Rp 77,343.32 Rp 43,899,821.67
Rp 46,662.98 Rp 26,485,755.29

###
### Rp 1,987,820.75
Rp132,423.19 Rp 859,373.53
Rp721,222.50 Rp 14,097,014.99
Rp 33,925.69 Rp 1,357,027.60
Rp 39,618.65 Rp 1,347,034.10
Rp 33,925.69 Rp 576,736.73
Rp123,100.00 Rp 246,200.00
NURDIN IBRAHIM 301160017 Rencana anggaran biaya
###
Rp109,267.25 Rp 12,252,683.08
Rp186,577.73 Rp 12,095,833.91

###
Rp185,783.85 Rp 18,231,897.68
Rp262,485.78 Rp 3,674,800.85
Rp262,485.78 Rp 2,393,870.27
Rp 77,796.33 Rp 504,353.61

###
Rp349,439.00 Rp 349,439.00
Rp140,737.00 Rp 10,977,486.00
Rp 32,660.00 Rp 163,300.00
Rp 37,835.00 Rp 189,175.00
Rp161,805.00 Rp 647,220.00
Rp 46,776.25 Rp 795,196.25

NURDIN IBRAHIM 301160017 Rencana anggaran biaya


HARGA
HARGA TOTAL
SATUAN
Rp9,289,529.98
### Rp 2,776,447.88
Rp950,796.66 Rp 1,901,593.31
Rp345,235.75 Rp 1,380,943.00
Rp 59,471.10 Rp 1,394,597.30
Rp 60,999.45 Rp 792,992.85
Rp 92,872.28 Rp 1,042,955.65

###
Rp 25,712.74 Rp 14,594,466.11
Rp 25,712.74 Rp 2,523,319.25

Rp8,617,549.24
### Rp 3,004,225.77
### Rp 624,569.42
### Rp 2,625,660.02
### Rp 2,363,094.02

###
Rp259,950.98 Rp 76,145,725.99
Rp 77,343.32 Rp 54,706,849.27
Rp 46,662.98 Rp 33,005,879.46

Rp8,994,541.52
### Rp 2,968,795.20
Rp132,423.19 Rp 834,160.16
Rp721,222.50 Rp 1,694,007.41
Rp 33,925.69 Rp 1,357,027.60
Rp 39,618.65 Rp 1,347,034.10
Rp 39,618.65 Rp 673,517.05
Rp120,000.00 Rp 120,000.00

###
Rp 67,131.25 Rp 7,663,032.19
Rp109,267.25 Rp 11,132,693.77
Rp186,577.73 Rp 12,095,833.91

###
Rp185,783.85 Rp 18,231,897.68
Rp183,139.21 Rp 618,094.83
Rp262,485.78 Rp 2,236,378.80
Rp 77,796.33 Rp 504,353.61

Rp1,351,863.50
Rp 32,660.00 Rp 195,960.00
Rp 37,835.00 Rp 75,670.00
Rp161,805.00 Rp 485,415.00
NURDIN IBRAHIM 301160017 Rencana anggaran biaya
Rp 46,776.25 Rp 467,762.50
Rp 42,352.00 Rp 127,056.00

Rp8,002,283.28
### Rp 2,776,447.88
Rp950,796.66 Rp 950,796.66
Rp345,235.75 Rp 690,471.50
Rp 59,471.10 Rp 1,308,364.20
Rp 60,999.45 Rp 975,991.20
Rp 92,872.28 Rp 1,300,211.85

###
Rp 25,712.74 Rp 18,187,255.14
Rp 25,712.74 Rp 2,523,319.25
TOTAL ###

NURDIN IBRAHIM 301160017 Rencana anggaran biaya


REKAPITULASI

NO URAIAN PEKERJAAN

I. PEKERJAAN PERSIAPAN

II. PEKERJAAN GEDUNG LANTAI I


A. PEKERJAAN TANAH
B. PEKERJAAN PONDASI
C. PEKERJAAN BETON
D. PEKERJAAN PASANGAN
E. PEKERJAAN KUNSEN, PINTU, JENDELA, PENTILASI
F. PEKERJAAN PENUTUP ATAP DAN FLAFOND
G. PEKERJAAN LANTAI
H. PEKERJAAN INSTALASI LISTRIK
I. PEKERJAAN SANITAR
J. PEKERJAAN PENGECETAN

III. PEKERJAAN GEDUNG LANTAI II


A. PEKERJAAN BETON
B. PEKERJAAN PASANGAN
C. PEKERJAAN KUNSEN, PINTU, Jendela & Ventilasi
D. PEKERJAAN PENUTUP ATAP DAN FLAFOND
E. PEKERJAAN LANTAI
F. PEKERJAAN INSTALASI LISTRIK
G. PEKERJAAN SANITAR
H. PEKERJAAN PENGECETAN
TOTAL
PPN 10 %
JUMLAH TOTAL + PPN 10 %
DIBULATKAN

NURDIN IBRAHIM 301160017 Rekapitulasi


HARGA TOTAL

22,514,224.24

400,507,375.83
40,622,955.70
54,719,737.52
49,479,600.97
146,531,302.95
20,471,207.70
24,348,516.99
24,804,922.40
13,121,816.25
9,289,529.98
17,117,785.35

264,017,551.43
8,617,549.24
163,858,454.72
8,994,541.52
30,891,559.87
21,590,724.92
1,351,863.50
8,002,283.28
20,710,574.39
687,039,151.50
###
###
###

NURDIN IBRAHIM 301160017 Rekapitulasi

Anda mungkin juga menyukai