Jumlah Rp 23,639
Keuntungan+Over head 10% Rp 2,364
Total = Jumlah+(Keuntungan+Over head 10%) Rp 26,003
ANALISA HARGA SATUAN MEKANIKAL DAN ELEKTRIKAL
B. PEKERJAAN VAC :
1 Ceiling Extract Fan , Kapasitas : 100 CFM Rp 640,000 unit
2 Exhaust Air Grille (EAG) Rp 31,000 inchi
3 AC Single Split Wall Type, Kap. 7 500 BTUH Rp 3,909,000 unit
4 AC Single Split Wall Type, Kap. 9 600 BTUH Rp 4,895,000 unit
5 AC Single Split Wall Type, Kap. 12 000 BTUH Rp 5,950,000 unit
6 AC Single Split Wall Type, Kap. 18 000 BTUH Rp 6,300,000 unit
7 AC Single type Cassete, Kap. 9 500 BTUH Rp 12,670,000 unit
8 AC Single type Cassete, Kap. 17 500 BTUH Rp 17,200,000 unit
9 AC Single type Cassete, Kap. 22 200 BTUH Rp 19,988,000 unit
10 AC Single type Cassete, Kap. 27 000 BTUH Rp 23,345,000 unit
11 AC Single type Cassete, Kap. 33 500 BTUH Rp 32,447,000 unit
12 AC Single type Cassete, Kap. 39 000 BTUH Rp 32,445,000 unit
13 AC Single type Cassete, Kap. 45 000 BTUH unit
14 Fire Extinguisher ( Dry Chemical ) Kap. 6 Kg Rp 880,000 bh
15 Dudukan Fire Extinguisher Rp 150,000 bh
16 Pemipaan Refrigran liquid dan Gas Terisolasi Rp 179,000 m
E. PEKERJAAN PLUMBING
1 Pompa Transfer ( Multy Split ) Kapasitas : 4m3/h, 12M Rp 7,500,000 unit
2 Roof Tank : 2 M3 (Efektive) Rp 4,300,000 unit
3 Dudukan Roof Tank Rp 2,500,000 unit
4 Water Level Control ( WLC ) Rp 412,200 Set
5 GATE VALVE DIA.25 MM / 10 Kg Rp 350,000 bh
6 CHECK VALVE DIA. 25 MM Rp 385,000 bh
7 Clean Out dia. 80 mm Rp 218,500 bh
8 Clean Out dia. 100 mm Rp 273,100 bh
9 Vent Out Rp 25,000 bh
10 Roof Drain diameter 100 mm Rp 346,800 bh
11 PIPA PVC Dia. 1” Rp 12,595 m¹
12 PIPA PVC Dia. 2” Rp 31,433 m¹
13 PIPA PVC Dia. 3” Rp 61,683 m¹
14 PIPA PVC Dia. 4” Rp 88,250 m¹
H. PENANGKAL; PETIR
1 Air Terminal - Radiuas 75 M Rp 37,500,000 unit
2 Air Terminal Konvensional Rp 250,000 unit
3 Obstruction Lamp Rp 4,353,800 bh
4 Cable XLPE 1 x 70 mm2 Rp 485,000 m¹
5 BC 50mm2 Rp 67,000 m¹
6 Connecting Sleeve lengkap surge arester Rp 4,000,000 Set
7 Lightening Flash counter Rp 7,500,000 Set
8 Grounding sistem Rp 4,500,000 Set
- Copper road
- Pentanahan & pipa GIP dia. 1 1/2 "
- Bak kontrol ( 40x40) cm lengkap tutup
- Kawat BCC dia. 70 mm
9 Testing/pengukuran pentanahan Rp 1,000,000 titik
10 Tiang / Menara - dududkan EF Rp 4,853,500 unit
NO SNI ANALISA BIAYA KONSTRUKSI HARGA JUMLAH
PEKERJAAN MEKANIKAL & ELEKTRIKAL SATUAN HARGA
(Rp) (Rp)
1.000 bh
Armatur Baret TCW 211 + Philips 32 W 1 Set 271,381.20 271,381.20
4.000 bh
Fitser + Sekrup 358.43 1,433.71
0.250 o/hr
Tukang listrik 80,000.00 20,000.00
0.100 o/hr
Mandor 100,000.00 10,000.00
Jumlah 302,814.91
K.1 SPL 1 BH PEMASANGAN LAMPU SOROT CRESBAY HPI 250 W
1.000 bh
Armatur RM ALML TBS 318 2 X 36 W + Lampu 564,370.49 564,370.49
4.000 bh
Pelubangan Plafon 7,680.60 30,722.40
4.000 bh
Penggantung/Pengikat 1,177.69 4,710.77
0.500 o/hr
Tukang listrik 80,000.00 40,000.00
0.050 o/hr
Mandor 100,000.00 5,000.00
Jumlah 644,803.66
K.1 SPL 1 BH PEMASANGAN ARMATUR LAMPU CERMIN
1.000 bh
Armatur Lampu TCW 090 + Lampu 18 W 220,177.20 220,177.20
4.000 bh
Penggantung/Pengikat 1,177.69 4,710.77
0.250 o/hr
Tukang listrik 80,000.00 20,000.00
0.100 o/hr
Mandor 100,000.00 10,000.00
Jumlah 254,887.97
K.1 SPL 1 BH PEMASANGAN KRISTAL
1.000 bh
Armatur Down Light 175 Artolite + Lampu 18 W 112,648.80 112,648.80
1.000 bh
Pelubangan Plafon 7,680.60 7,680.60
0.250 o/hr
Tukang listrik 80,000.00 20,000.00
0.100 o/hr
Mandor 100,000.00 10,000.00
Jumlah 150,329.40
K.1 SPL 1 BH PEMASANGAN LAMPU DOWN LIGHT 125 + 8 W
1.000 bh
Armatur Down Light 125 Artolite + Lampu 8 W 117,769.20 117,769.20
1.000 bh
Pelubangan Plafon 7,680.60 7,680.60
0.250 o/hr
Tukang listrik 80,000.00 20,000.00
0.100 o/hr
Mandor 100,000.00 10,000.00
Jumlah 155,449.80
K.1 SPL 1 BH PEMASANGAN LAMPU BARET + LAMPU 20 W
1.000 bh
Armatur Lampu Baret + TL Bundar 20 W 286,742.40 286,742.40
4.000 bh
Fitser + Sekrup 358.43 1,433.71
0.250 o/hr
Tukang listrik 80,000.00 20,000.00
0.100 o/hr
Mandor 100,000.00 10,000.00
Jumlah 318,176.11
K.1 SPL 1 BH PEMASANGAN LAMPU RM 4 X 20 W
Jumlah 438,812.74
Straight Tray
1.000 Mtr Lebar 800 mm 271,125.18 271,125.18
1.000 Mtr Lebar 300 mm 223,761.48 223,761.48
1.000 Mtr Lebar 200 mm 206,096.10 206,096.10
Elbow
1.000 Mtr Lebar 300 mm 286,742.40 286,742.40
1.000 Mtr Lebar 200 mm 235,538.40 235,538.40
Reducer Tee
1.000 Mtr Lebar 300 ke 200 353,307.60 353,307.60
1.000 bh
Speaker Profesional ex.JBL Lengkap Ass 0.00
8.000 bh
Fitser + Sekrup 358.43 2,867.42
4.000 bh
Penggantung Type B 35,842.80 143,371.20
1.000 o/hr
Tukang listrik 100,000.00 100,000.00
0.500 o/hr
Mandor 150,000.00 75,000.00
Jumlah 321,238.62
K.1 SPL 1 BH PEMASANGAN OUTLET MIC
1.000 bh
Hidrant Pilar 2 Mata Lengkap Ass + Box hidrant 6,144,480.00 6,144,480.00
0.025 m3
Conrete campuran beton 2,500,000.00 62,500.00
4.000 bh
Mur Baut 15,000.00 60,000.00
1.000 bh
Karet silent 55,000.00 55,000.00
1.200 o/hr
Pekerja 80,000.00 96,000.00
0.500 o/hr
Tukang listrik 100,000.00 50,000.00
0.050 o/hr
Mandor 150,000.00 7,500.00
Jumlah 6,475,480.00
K.1 SPL 1 BH PEMASANGAN SIEMESE CONNECTION
Jumlah 823,245.94
Antenna UHF Jumlah 2,139,188.74
Antenna VHF Jumlah 1,975,335.94
TV test point 14" Jumlah 4,663,545.94
DVD / VCD Player Jumlah 3,281,037.94
Passive Combiner 16 channel Jumlah 2,308,161.94
Booster Amplifier Jumlah 3,229,833.94
Grounding Jumlah 3,383,445.94
kabel feeder dari antenna lokal Jumlah 843,215.50
Spliter 4 way Jumlah 2,717,793.94
Gantungan TV Jumlah 976,857.94
Booster Amplifier Jumlah 3,229,833.94
K.1 SPL 1 MTR KABEL COAXIAL DARI COMBINER KE SPLITER
1.000 m' Kabel Coaxial 7c-2v, 75 ohm 7,680.60 7,680.60
4.000 bh Fitser + Sekrup 358.43 1,433.71
2.000 bh Sadel Pipa listrik 358.43 716.86
2.000 bh Kabel Teets 358.43 716.86
0.200 Mtr Pipa Spiral 1,280.10 256.02
1.000 bh L-Bow 2,304.18 2,304.18
0.500 btg Pipa Clipsal 8,704.68 4,352.34
0.200 bh Isolasi 6,000.00 1,200.00
0.250 o/hr Pekerja 80,000.00 20,000.00
0.250 o/hr Tukang listrik 100,000.00 25,000.00
0.100 o/hr Mandor 150,000.00 15,000.00
Jumlah 78,660.56
K.1 SPL 1 MTR KABEL ITC DARI TBTLP KE MDF
1.000 m' Kabel ITC 40x2x0,6 mm 27,035.71 27,035.71
4.000 bh Fitser + Sekrup 358.43 1,433.71
2.000 bh Sadel Pipa listrik 358.43 716.86
2.000 bh Kabel Teets 358.43 716.86
0.200 Mtr Pipa Spiral 1,280.10 256.02
1.000 bh L-Bow 2,304.18 2,304.18
0.500 btg Pipa Clipsal 8,704.68 4,352.34
0.200 bh Isolasi 6,000.00 1,200.00
0.250 o/hr Pekerja 80,000.00 20,000.00
0.250 o/hr Tukang listrik 100,000.00 25,000.00
0.100 o/hr Mandor 150,000.00 15,000.00
Jumlah 98,015.68
K.1 SPL 1 BH PEMASANGAN PABX
1.000 Set Sentral PABX LG 3 CO 8 Ext. Telp.Operator Con.Aria 8,733,354.24 8,733,354.24
1.000 Set Expand Card 8 Ext. AR-SLIB8.STG 4,313,424.96 4,313,424.96
1.000 Set Single Line Tlp. GS-460F 399,391.20 399,391.20
4.000 Set MDF Kap. 30 Pair 1,024,080.00 4,096,320.00
4.000 bh Press Kabel 15,873.24 63,492.96
2.000 bh Pengukuran/Injection 768,060.00 1,536,120.00
4.000 bh Penggantung/Pengikat Type B 35,842.80 143,371.20
2.000 mtr Ducting Jalur kabel 23,041.80 46,083.60
24.000 bh Kabel Teets 358.43 8,602.27
8.000 bh Fitser + Sekrup 358.43 2,867.42
1.000 mtr Setting alat 1,500,000.00 1,500,000.00
4.000 bh Mur Baut 15,361.20 61,444.80
5.000 o/hr Pekerja 80,000.00 400,000.00
3.500 o/hr Tukang listrik 100,000.00 350,000.00
2.350 o/hr Mandor 150,000.00 352,500.00
Jumlah 22,006,972.66
1.000 Set Box Hidrant + Terminal Box + Announciator 10 zona 7,565,391.00 7,565,391.00
1.000 Set Box Hidrant + Terminal Box + Announciator 40 Zona 16,385,280.00 16,385,280.00
1.000 Set MCFA 40 Zona 13,179,909.60 13,179,909.60
1.000 Set
Pompa Jocky type compact R2XCR5+ Panel Kontrol 79,878,240.00 79,878,240.00
1.000 Set
Heather 5,120,400.00 5,120,400.00
1.000 Set
Pressure Switch 1,280,100.00 1,280,100.00
0.250 m3
Dudukan Pompa 2,560,200.00 640,050.00
1.500 M
Karet Silent 56,324.40 84,486.60
8.000 bh
Mur Baut 15,361.20 122,889.60
6.000 o/hr
Tukang listrik 100,000.00 600,000.00
2.000 o/hr
Mandor 150,000.00 300,000.00
Jumlah 88,026,166.20
K.1 SPL 1 BH PEMASANGAN POMPA PENGISIAN
2.000 Set
Pompa type CM 10 1.9KW/220 + Panel Kontrol 12,596,184.00 25,192,368.00
1.000 Set
Heather 5,120,400.00 5,120,400.00
1.000 Set
Pressure Switch 1,280,100.00 1,280,100.00
0.250 m3
Dudukan Pompa 2,560,200.00 640,050.00
1.500 M
Karet Silent 56,324.40 84,486.60
8.000 bh
Mur Baut 15,361.20 122,889.60
6.000 o/hr
Tukang listrik 100,000.00 600,000.00
2.000 o/hr
Mandor 150,000.00 300,000.00
Jumlah 33,340,294.20
K.1 SPL 1 BH PEMASANGAN PANEL LISTRIK MDP
Jumlah 3,843,049.74
K.1 SPL 1 BH PEMASANGAN PENANGKAL PETIR
1.000 Set Switch hub + rak dan Setting Program 7,680,600.00 7,680,600.00
1.000 Set Patch panel 3,430,668.00 3,430,668.00
1.000 Set Star hub 12 port 1,536,120.00 1,536,120.00
1.000 Set Wifi Program internet 1,587,324.00 1,587,324.00
1.000 Set Outlet Data 102,408.00 102,408.00
1.000 Set Wifi Internet dan Setting 1,587,324.00 1,587,324.00
0.200 Mtr Betelan dan Perapian tembok 22,500.00 4,500.00
4.000 bh Fitser + Sekrup 358.43 1,433.71
4.000 bh Penggantung/Pengikat 1,177.69 4,710.77
0.250 o/hr Pekerja 80,000.00 20,000.00
0.250 o/hr Tukang listrik 100,000.00 25,000.00
0.100 o/hr Mandor 150,000.00 15,000.00
Outlet Data+Wifi Program Jumlah 173,052.48
Switch hub + rak dan Setting Program 7,751,244.48
Patch panel 3,501,312.48
Star hub 12 port 1,606,764.48
Wifi Program internet 1,657,968.48
K.1 SPL 1 BH PEMASANGAN SETRAL TLP/PABX
Jumlah 204,978.31
K.1 SPL 1 MTR PEMASANGAN PIPA 3" PVC AW
TERBILANG : EMPAT MILIAR LIMA RATUS LIMA PULUH SATU JUTA DUA RATUS ENAM PULUH RIBU RUPIAH
Diperiksa; Dibuat;
Kantor Dinas SDA Cipta Karya dan Tata Ruang Konsultan Perencana
CV. FIRMA Konsultan
Disetujui;
Pejabat Pembuat Komitmen
UPT ASRAMA HAJI MAKASSAR
TERBILANG : EMPAT MILIAR LIMA RATUS LIMA PULUH SATU JUTA DUA RATUS ENAM PULUH RIBU RUPIAH
Diperiksa; Dibuat;
KABID Keciptakaryaan dan Bina Teknik Konsultan Perencana
Kantor Dinas SDA Cipta Karya dan Tata Ruang CV. FIRMA Konsultan
Disetujui;
Pejabat Pembuat Komitmen
UPT ASRAMA HAJI MAKASSAR
TERBILANG : DUA MILYAR DUA RATUS TIGA JUTA TIGA RATUS TIGA PULUH TIGA RIBU RUPIAH
Dibuat ;
PT. Rancang Rencana Indonesia
MUSMULIYADI, ST
Direktur Utama
RENCANA ANGGARAN BIAYA
DIMENSI
TIPE VOLUME
PANJANG LEBAR TINGGI
I 9.275 0.475 0.7 3.08
15 0.475 0.7 4.99
8.85 0.475 0.7 2.94
TOTAL
DIMENSI
TIPE VOLUME
PANJANG LEBAR TINGGI
I 9.275 0.475 0.05 0.22
15 0.475 0.05 0.36
8.85 0.475 0.05 0.21
TOTAL
TOTAL
DIMENSI
TIPE VOLUME
PANJANG LEBAR TINGGI
I 9.275 0.3 0.5 1.39
15 0.3 0.5 2.25
8.85 0.3 0.5 1.33
TOTAL
DIMENSI
TIPE VOLUME
PANJANG LEBAR TINGGI
I 54.34
B PEK.BETON
Pek. Sloof (15 x 25)
DIMENSI
TIPE VOLUME
PANJANG LEBAR TINGGI
15.15 0.15 0.25 0.57
8.85 0.15 0.25 0.33
8 0.15 0.25 0.30
1.35 0.15 0.25 0.05
5.6 0.15 0.25 0.21
8.85 0.15 0.25 0.33
TOTAL
DIMENSI
TIPE VOLUME
PANJANG LEBAR TINGGI
15.15 0.15 0.15 0.34
8.85 0.15 0.15 0.20
8 0.15 0.15 0.18
1.35 0.15 0.15 0.03
5.6 0.15 0.15 0.13
8.85 0.15 0.15 0.20
TOTAL
DIMENSI
TIPE VOLUME
PANJANG LEBAR TINGGI
Bangunan Baru 0.15 0.15 3.5 0.08
Bangunan Lama 0.15 0.15 3.5 0.08
TOTAL
PEKERJAAN ARSITEKUR
PEKERJAAN PENUTUP LANTAI
Pek. Timbunan Tanah
DIMENSI
TIPE JMLH
AREA TINGGI
Dalam Bangunan 2.50 0.18 2.00
2.16 0.18 1.00
41.16 0.18 1.00
24.44 0.18 1.00
43.00 0.18 1.00
2.50 0.13 4.00
TOTAL
PEK. TRASRAM
Kamar mandi
DIMENSI
TIPE AREA
Keliling TINGGI
1 5.98 1.50 8.97
2 5.68 1.50 8.52
TOTAL
TOTAL
PEK. PENGECATAN
Cat plaster waterproof & Cat Exrterior
VOLUME
JMLH
M' M² M³
2 6.17
3 14.96
1 2.94
24.07
1 8.29
1 4.48
6 4.54
2 9.86
1 3.11
30.27
54.34
VOLUME
JMLH
M' M² M³
2 0.44
3 1.07
1 0.21
1.72
1 0.59
1 0.32
6 0.32
2 0.70
1 0.22
2.16
3.88
VOLUME
JMLH
M' M² M³
2 1.32
3 3.21
1 0.63
5.16
1 1.78
1 0.96
6 0.97
2 2.11
1 0.67
6.49
11.64
VOLUME
JMLH
M' M² M³
2 2.78
3 6.75
1 1.33
10.86
1 3.33
1 1.80
6 1.82
2 3.96
1 1.25
12.16
23.02
VOLUME
JMLH
M' M² M³
0.33 18.11
18.11
VOLUME
JMLH
M' M² M³
2 1.14
3 1.00
1 0.30
6 0.30
1 0.21
1 0.33
3.28
VOLUME
JMLH
M' M² M³
2 0.68
3 0.60
1 0.18
6 0.18
1 0.13
1 0.20
1.97
VOLUME
JMLH
M' M² M³
27 2.13
11 0.87
2.99
VOLUME
M' M² M³
0.90
0.39
7.41
4.40
7.74
1.30
22.13
VOLUME
M' M² M³
1.13 4
0.16
3.09
1.83
3.22
9.43
VOLUME
M' M² M³
0.45
0.06
1.23
0.73
1.29
3.77
VOLUME
M' M² M³
5.00
2.16
41.16
24.44
43.00
10.00
125.76
VOLUME
AREA
M' M² M³
10.85 10.85
19.60 19.60
25.73 22.23
4.73 4.27
20.48 20.48
25.73 22.23
4.73 4.27
6.48 6.48
6.48 6.48
4.73 3.21
6.48 6.48
4.73 3.21
6.48 6.48
6.48 6.48
4.73 4.27 0.63 1.5 0.945
6.48 6.48 4 1.5 6
6.48 6.48 1.35 1.5 2.025
2.00 2.00 8.97
8.23 8.23 0.63 1.5 0.945
3.06 3.06 3.7 1.5 5.55
4.73 3.21 1.35 1.5 2.025
9.98 9.98 8.52
9.98 6.83
15.23 12.08
7.00 7.00
4.73 4.27
5.60 2.45
7.00 7.00
4.73 3.21
5.08 5.08
4.73 3.21
6.48 6.48
6.48 6.48
13.48 13.48
22.23 22.23
6.48 6.48
7.00 7.00
9.98 9.98
16.98 16.98
12.25 12.25
17.59 14.44
11.73 11.73
16.98 16.98
14.53 14.53
2.54 2.54
399.07
VOLUME
JMLH
M' M² M³
1.00 8.97
4.00 8.52
17.49
VOLUME
TOTAL
M' M² M³
780.66
780.66
VOLUME
TOTAL
M' M² M³
49.08
31.58
36.75
17.50
11.03
17.50
1.58
12.25
14.88
11.73
18.03
31.50
253.38 506.75
253.38 253.38
PERATURAN MENTERI PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
NOMOR : 28/PRT/M/2016
ANALISA HARGA SATUAN PEKERJAAN (AHSP)
CATATAN
Bobot isi pasir + 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Bucking factor pasir = 20 %
1 Membuat 1 m3 beton mutu f' = 7,4 Mpa (K 100), slump (12 ±2) cm, w/c = 0,87
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 113,000.00 186,450.00
Tukang batu L.02 OH 0.275 141,000.00 38,775.00
Kepala Tukang L.03 OH 0.028 153,000.00 4,284.00
Mandor L.04 OH 0.083 176,000.00 14,608.00
JUMLAH TENAGA KERJA 244,117.00
B BAHAN
Semen portland Kg 247.000 1,200.00 296,400.00
Pasir beton Kg 869 160.71 139,660.71
Kerikil (Maks. 30 mm) Kg 999 160.71 160,553.57
Air Ltr 215 50.00 10,750.00
JUMLAH HARGA BAHAN 607,364.29
C PERALATAN
2 Membuat 1 m3 beton mutu f' = 9,8 Mpa (K 125), slump (12 ±2) cm, w/c = 0,78
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 113,000.00 186,450.00
Tukang batu L.02 OH 0.275 141,000.00 38,775.00
Kepala Tukang L.03 OH 0.028 153,000.00 4,284.00
Mandor L.04 OH 0.083 176,000.00 14,608.00
JUMLAH TENAGA KERJA 244,117.00
B BAHAN
Semen portland Kg 276.000 1,200.00 331,200.00
Pasir beton Kg 828 160.71 133,071.43
Kerikil (Maks. 30 mm) Kg 1012 160.71 162,642.86
Air Ltr 215 50.00 10,750.00
JUMLAH HARGA BAHAN 637,664.29
C PERALATAN
3 Membuat 1 m3 beton mutu f' = 12,2 Mpa (K 150), slump (12 ±2) cm, w/c = 0,72
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 113,000.00 186,450.00
Tukang batu L.02 OH 0.275 141,000.00 38,775.00
Kepala Tukang L.03 OH 0.028 153,000.00 4,284.00
Mandor L.04 OH 0.083 176,000.00 14,608.00
JUMLAH TENAGA KERJA 244,117.00
B BAHAN
Semen portland Kg 299.000 1,200.00 358,800.00
Pasir beton Kg 799 160.71 128,410.71
Kerikil (Maks. 30 mm) Kg 1017 160.71 163,446.43
Air Ltr 215 50.00 10,750.00
JUMLAH HARGA BAHAN 661,407.14
C PERALATAN
5 Membuat 1 m3 beton mutu f' = 14,5 Mpa (K 175), slump (12 ±2) cm, w/c = 0,65
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 113,000.00 186,450.00
Tukang batu L.02 OH 0.275 141,000.00 38,775.00
Kepala Tukang L.03 OH 0.028 153,000.00 4,284.00
Mandor L.04 OH 0.083 176,000.00 14,608.00
JUMLAH TENAGA KERJA 244,117.00
B BAHAN
Semen portland Kg 326.000 1,200.00 391,200.00
Pasir beton Kg 760 160.71 122,142.86
Kerikil (Maks. 30 mm) Kg 1029 160.71 165,375.00
Air Ltr 215 -
JUMLAH HARGA BAHAN 678,717.86
C PERALATAN
6 Membuat 1 m3 beton mutu f' = 19,3 Mpa (K 225), slump (12 ±2) cm, w/c = 0,58
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 113,000.00 186,450.00
Tukang batu L.02 OH 0.275 141,000.00 38,775.00
Kepala Tukang L.03 OH 0.028 153,000.00 4,284.00
Mandor L.04 OH 0.083 176,000.00 14,608.00
JUMLAH TENAGA KERJA 244,117.00
B BAHAN
Semen portland Kg 371.000 1,200.00 445,200.00
Pasir beton Kg 698 160.71 112,178.57
Kerikil (Maks. 30 mm) Kg 1047 160.71 168,267.86
Air Ltr 215 50.00 10,750.00
JUMLAH HARGA BAHAN 736,396.43
C PERALATAN
8 Membuat 1 m3 beton mutu f' = 24,0 Mpa (K 275), slump (12 ±2) cm, w/c = 0,53
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 113,000.00 186,450.00
Tukang batu L.02 OH 0.275 141,000.00 38,775.00
Kepala Tukang L.03 OH 0.028 153,000.00 4,284.00
Mandor L.04 OH 0.083 176,000.00 14,608.00
JUMLAH TENAGA KERJA 244,117.00
B BAHAN
Semen portland Kg 406.000 1,200.00 487,200.00
Pasir beton Kg 684 160.71 109,928.57
Kerikil (Maks. 30 mm) Kg 1026 160.71 164,892.86
Air Ltr 215 50.00 10,750.00
JUMLAH HARGA BAHAN 772,771.43
C PERALATAN
9 Membuat 1 m3 beton mutu f' = 26,4 Mpa (K 300), slump (12 ±2) cm, w/c = 0,52
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 113,000.00 186,450.00
Tukang batu L.02 OH 0.275 141,000.00 38,775.00
Kepala Tukang L.03 OH 0.028 153,000.00 4,284.00
Mandor L.04 OH 0.083 176,000.00 14,608.00
JUMLAH TENAGA KERJA 244,117.00
B BAHAN
Semen portland Kg 413.000 1,200.00 495,600.00
Pasir beton Kg 681 160.71 109,446.43
Kerikil (Maks. 30 mm) Kg 1021 160.71 164,089.29
Air Ltr 215 50.00 10,750.00
JUMLAH HARGA BAHAN 779,885.71
C PERALATAN
C PERALATAN
3 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP:2PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 113,000.00 33,900.00
Tukang batu L.02 OH 0.100 141,000.00 14,100.00
Kepala tukang L.03 OH 0.0100 153,000.00 1,530.00
Mandor L.04 OH 0.0150 176,000.00 2,640.00
JUMLAH TENAGA KERJA 52,170.00
B BAHAN
Bata merah bh 70.000 1,000.00 70,000.00
Semen portland kg 18.950 1,200.00 22,740.00
Pasir pasang m3 0.0380 225,000.00 8,550.00
JUMLAH HARGA BAHAN 101,290.00
C PERALATAN
5 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP:4PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 113,000.00 33,900.00
Tukang batu L.02 OH 0.100 141,000.00 14,100.00
Kepala tukang L.03 OH 0.0100 153,000.00 1,530.00
Mandor L.04 OH 0.0150 176,000.00 2,640.00
JUMLAH TENAGA KERJA 52,170.00
B BAHAN
Bata merah bh 70.000 1,000.00 70,000.00
Semen portland kg 11.500 1,200.00 13,800.00
Pasir pasang m3 0.0430 225,000.00 9,675.00
JUMLAH HARGA BAHAN 93,475.00
C PERALATAN
3 Pemasangan 1 m2 acian
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.200 113,000.00 22,600.00
Tukang batu L.02 OH 0.100 141,000.00 14,100.00
Kepala tukang L.03 OH 0.0100 153,000.00 1,530.00
Mandor L.04 OH 0.0100 176,000.00 1,760.00
JUMLAH TENAGA KERJA 39,990.00
B BAHAN
Semen kg 3.250 1,200.00 3,900.00
JUMLAH HARGA BAHAN 3,900.00
C PERALATAN
1 Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 7.000 113,000.00 791,000.00
Tukang kayu L.02 OH 21.000 141,000.00 2,961,000.00
Kepala tukang L.03 OH 2.1000 153,000.00 321,300.00
Mandor L.04 OH 0.3500 176,000.00 61,600.00
JUMLAH TENAGA KERJA 4,134,900.00
B BAHAN
Balok kayu klas I m3 1.100 11,882,500.00 13,070,750.00
Paku 10cm kg 1.250 15,700.00 19,625.00
Lem kayu kg 1.000 15,700.00 15,700.00
JUMLAH HARGA BAHAN 13,106,075.00
C PERALATAN
2 Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II dan III
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 6.000 113,000.00 678,000.00
Tukang kayu L.02 OH 18.000 141,000.00 2,538,000.00
Kepala tukang L.03 OH 1.8000 153,000.00 275,400.00
Mandor L.04 OH 0.3000 176,000.00 52,800.00
JUMLAH TENAGA KERJA 3,544,200.00
B BAHAN
Balok kayu Klas II m3 1.200 3,657,500.00 4,389,000.00
Paku 10cm kg 1.250 15,700.00 19,625.00
Lem kayu kg 1.000 15,700.00 15,700.00
JUMLAH HARGA BAHAN 4,424,325.00
C PERALATAN
1 1 m² Pengecetan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.070 113,000.00 7,910.00
Tukang cat L.02 OH 0.009 141,000.00 1,269.00
Kepala tukang L.03 OH 0.006 153,000.00 918.00
Mandor L.04 OH 0.003 176,000.00 528.00
JUMLAH TENAGA KERJA 10,625.00
B BAHAN
Cat menie kg 0.200 23,885.71 4,777.14
Plamuur kg 0.150 42,850.00 6,427.50
Cat dasar kg 0.170 37,342.86 6,348.29
Cat penutup kg 0.260 57,500.00 14,950.00
Kuas bh 0.010 18,300.00 183.00
Pengencer kg 0.030 31,350.00 940.50
Amplas lbr 0.200 13,600.00 2,720.00
JUMLAH HARGA BAHAN 36,346.43
C PERALATAN
3 Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) Interior
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.020 113,000.00 2,260.00
Tukang cat L.02 OH 0.063 141,000.00 8,883.00
Kepala tukang L.03 OH 0.0063 153,000.00 963.90
Mandor L.04 OH 0.003 176,000.00 528.00
JUMLAH TENAGA KERJA 12,634.90
B BAHAN
Plamuur Kg 0.100 8,360.00 836.00
Cat dasar kg 0.100 75,000.00 7,500.00
Cat Penutup Kg 0.260 58,520.00 15,215.20
JUMLAH HARGA BAHAN 23,551.20
C PERALATAN
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
PERATURAN MENTERI PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
NOMOR : 28/PRT/M/2016
ANALISA HARGA SATUAN PEKERJAAN (AHSP)
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
Pemotongan 1 buah pipa HDPE φ 63 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.002
Tukang pipa L.02 OH 0.001
Mandor L.04 OH 0.0002
Operator L.08 OH 0.034
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE φ 63 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik/cilinder/saw hari 0.004
JUMLAH HARGA ALAT
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
Pemotongan 1 buah pipa HDPE φ 1000 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 1.125
Tukang pipa L.02 OH 0.562
Mandor L.04 OH 0.112
Operator L.08 OH 0.971
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE φ 1000 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik/cilinder/saw hari 0.332
JUMLAH HARGA ALAT
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
Pemotongan 1 buah pipa GIP φ 200 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.340
Tukang pipa L.02 OH 0.170
Mandor L.04 OH 0.034
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP φ 200 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik/cilinder/saw hari -
JUMLAH HARGA ALAT
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
Pemotongan 1 buah pipa GIP φ 900 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 1.770
Tukang pipa L.02 OH 0.885
Mandor L.04 OH 0.177
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP φ 900 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik/cilinder/saw hari -
JUMLAH HARGA ALAT
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
Pemotongan 1 buah pipa DCI φ 1100 mm ( baru )
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 4.731
Tukang pipa L.02 OH 0.946
Mandor L.04 OH 0.473
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI φ 1100 mm bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik/cilinder/saw hari 0.506
JUMLAH HARGA ALAT
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
PERATURAN MENTERI PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
NOMOR : 28/PRT/M/2016
ANALISA HARGA SATUAN PEKERJAAN (AHSP)
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
PERATURAN MENTERI PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
NOMOR : 28/PRT/M/2016
ANALISA HARGA SATUAN PEKERJAAN (AHSP)
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
PERATURAN MENTERI PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
NOMOR : 28/PRT/M/2016
ANALISA HARGA SATUAN PEKERJAAN (AHSP)
Pengetesan 1 m pipa φ 50 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.008
Mandor L.04 OH 0.0008
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.002
Bahan bakar ltr 0.060
Oli ltr 0.002
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
Pengetesan 1 m pipa φ 75 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.008
Mandor L.04 OH 0.0008
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.004
Bahan bakar ltr 0.06
Oli ltr 0.002
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
PERATURAN MENTERI PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
NOMOR : 28/PRT/M/2018
ANALISA HARGA SATUAN PEKERJAAN (AHSP)
1 2 3 4
B. BAHAN DASAR
1 Agregat Kasar M3 266,500
2 Agregat Halus M3 324,000
3 Batu Kali M3 320,000
4 Batu kali Belah M3 200,000
5 Batu Gunung M3 300,000
6 Batu Belah 10 - 15 cm M3 200,000
7 Batu Pecah 7 - 10 cm M3 300,000
8 Batu Pecah 5 - 7 cm M3 300,000
9 Batu Pecah 3 - 5 cm M3 300,000
10 Batu Pecah 2 - 3 cm M3 300,000
11 Batu Pecah 1- 2 cm M3 300,000
12 Batu Pecah 0,5 - 1 cm M3 300,000
13 Batu Merah Standar Biji 1,000
14 Bata Ringan Bh Rp 14,000.00 M3 900,000
15 Bata Block 21x10,5x6 cm - 60 Bh/M2 M2 33,400
16 Bata Block 21x10,5x8 cm - 47 Bh/M2 M2 37,900
17 Batako 40x20x10 cm - 13 Bh/M2 M2 68,600
18 Roster 15 x 30 cm M2 45,000
19 Glass Block Buah 30,000
20 Gravel M3 150,000
21 Material Pilihan M3 136,600
22 Urugan Pilihan M3 162,200
23 Pasir Kasar/Pasir Beton/Pasir Pasangan Kg Rp 160.71 M3 225,000
24 Sirtu A M3 260,000
25 Sirtu B M3 260,000
26 Sirtu C M3 260,000
27 Pasir Timbunan M3 160,000
28 Tanah Timbunan M3 150,000
29 Kerikil Sungai Kg Rp 240.74 M3 325,000
30 Semen 50 kg (Tonasa) P,C Kg Rp 1,300.00 Sak 65,000
31 Semen 40 kg (Tonasa) P,C Kg Rp 1,200.00 Sak 48,000
32 Semen Putih 40 kg per sak Sak 70,000
33 Pigmen Warna Sak 250,000
34 Semen Nat Tegel Kg 20,000
35 Kapur (karung) 3 Kg sak 62,700
36 Kapur hidrasi /Kapur Pasangan M3 62,700
37 Water Proofing M2 156,100
38 Paku jembatan kg 135,300
39 Plastik untuk beton M2 130,700
40 Perekat Bata Ringan (MU) Kg 3,750
41 Plaster Bata Ringan (MU) Kg 1,750
42 Acian Bata Ringan (MU) Kg 4,000
NO BAHAN MATERIAL DAN UPAH KERJA SATUAN HARGA (RP)
C. BAHAN BAMBU
1 Bambu - Petung Batang 100,000
2 Bambu - Besar Batang 40,000
3 Bambu - Sedang Batang 30,000
4 Bambu - Kecil Batang 25,000
5 Rotan Pengikat Ikat 35,000
6 Gorong-gorong ᶲ 30/ m Buah 175,000
7 Gorong-gorong ᶲ 40/ m Buah 175,000
8 Gorong-gorong ᶲ 70/ m Buah 175,000
9 Gorong-gorong ᶲ 80/ m Buah 175,000
D BAHAN BESI
28 Besi Beton Polos (Campuran) Kg 12,000
29 Besi Beton Ulir (Campuran) Kg 12,500
30 Besi Beton 6 mm ( 0, 22 kg / M' ) 2.64 11,742.42 Btg 31,000
31 Besi Beton 8 mm ( 0,39 kg / M' ) 4.68 10,042.74 Btg 47,000
32 Besi Beton 10 mm ( 0, 62 kg / M' ) 7.44 9,408.60 Btg 70,000
33 Besi Beton 12 mm ( 0, 89 kg / M' ) 10.68 9,831.46 Btg 105,000
34 Besi Beton 14 mm ( 1, 21 kg / M' ) 14.52 7,920.11 Btg 115,000
35 Besi Beton 16 mm ( 1, 39 kg / M' ) 16.68 9,592.33 Btg 160,000
36 Besi Beton 19 mm ( 2, 23 kg / M' ) 26.76 8,594.92 Btg 230,000
37 Besi Beton 20 mm ( 2, 46 kg / M' ) 29.52 13,042.01 Btg 385,000
38 Besi Beton Ulir Dia 8 mm ( 0, 39 kg / M' ) 4.68 14,957.26 Btg 70,000
39 Besi Beton Ulir Dia. 13 mm Btg 190,000
40 Besi Plat 1,5mm 1,2 mm M2 450,000
41 Besi Plat 2 mm Kg Rp 35,000.00 M2 600,000
42 Besi Plat 2,5mm M2 730,000
43 Besi Plat 3 mm M2 875,000
44 Besi Plat 3,5mm M2 1,010,000
45 Besi Plat 4 mm M2 1,100,000
46 Besi Plat 4,5mm M2 1,400,000
47 Besi Plat 5 mm M2 1,500,000
48 Besi Plat 5,5mm M2 1,765,000
49 Besi Plat 6 mm M2 1,800,000
50 Besi Plat 8 mm M2 2,400,000
51 Besi Plat 9 mm M2 2,950,000
60 Beugel Kap V Plat Besi Kg 13,800
61 Kawat Ikat Beton Kg 35,000
62 Kawat Duri ( 1 Roll = M') Kg 180,000
63 Kawat Ram Lubang 3,0 cm M' 35,000
64 Kawat Nyamuk Plastik M 25,000
65 Kawat Nyamuk Aluminium M 25,000
66 Kawat Nyamuk Baja M 20,900
67 Kawat Las 2,6 Dos 110,000
68 Kawat Saringan Pasir / Ayakan M 25,000
69 Kawat Bronjong Kg 25,000
70 Karet untuk Pintu dan Jendela Aluminium PVC M' 16,700
71 Door Closer Set Unit 2,777,700
72 Kanopi Polycarbonite + Rangka Besi Tempa Biasa 400 M2 294,900
73 Kanopi Polycarbonite + Rangka Besi Tempa Variasi 500 M2 327,700
74 Lem Kayu dan Karet (Fox) Besar (800 gr) Tube 15,700
75 Lem Karet (Fox) Besar Tube 50,300
76 Lem Seng M 10,000
77 Lembaran Atap Polycarbonite untuk Kanopi tebal 4 mm Roll 2,342,500
78 Lembaran Atap Polycarbonite untuk Kanopi tebal 5 mm Roll 0
79 Paku Campuran (5-10 cm) Kg 15,700
80 Paku Asbes dan Karet Kg 25,000
81 Paku Kg 15,700
NO BAHAN MATERIAL DAN UPAH KERJA SATUAN HARGA (RP)
E BAHAN FINISHING :
1 Cat Dasar Tembok Kg 75,000
NO BAHAN MATERIAL DAN UPAH KERJA SATUAN HARGA (RP)
F BAHAN KAYU
1 Kayu Klas. II Samarinda (balok)/ Lokal M3 3,657,500
2 Kayu Klas. II Samarinda (papan)/ Lokal M3 3,135,000
3 Kayu Kls. III Kapur (balok)/ Kemiri M3 1,672,000
4 Kayu Kls. III (papan) M3 2,926,000
5 Kayu Perancah M3 3,657,500
6 Kayu Mangga/Kemiri (papan) M3 2,299,000
7 Kayu Kumea Balok M3 5,747,500
8 Kayu Kumea Papan M3 6,792,500
9 Papan Kelas I M3 19,855,000
10 Papan Kelas II M3 3,657,500
11 Kayu lapis Tripleks Lapis Kayu Lainnya Uk. (0,4 x 122 x 244)cm Lembar 62,700
12 Kayu lapis Tripleks Lapis Kayu Lainnya Uk. (0,3 x 122 x 244)cm Lembar 52,250
13 Kayu lapis Tripleks Lapis Kayu Lainnya Uk. (0,6 x 122 x 244)cm Lembar 78,400
14 Akustik Board 30x30 Lembar 13,000
15 Akustik Board 30x60 Lembar 28,500
16 Akustik Board 60x120 Lembar 65,000
G BAHAN PENGGANTUNG
1 Engsel Baja Biji 21,800
2 Engsel Kuningan 4 Lubang Psg 78,400
3 Engsel Stainless Steel Psg 138,000
4 Engsel H 3 Lubang Psg 63,800
5 Engsel Kupu - kupu Psg 26,200
6 Engsel Antik Jendela Psg 201,700
7 Engsel Pintu Biasa (Merk 777) Psg 53,300
8 Engsel Pintu Lemari Biasa Psg 10,450
9 Engsel Jendela Biasa (Merk 777) Psg 36,600
10 Engsel Jendela Kuningan (merk Kuningan) Psg 31,350
11 Engsel Pintu 4" (SES) Bh 25,000
12 Engsel Jendela 3"(SES) Bh 20,000
13 Engsel Pintu Kuningan SES Psg 28,300
14 Engsel Pintu (Dorma) Psg 1,000,000
15 Gagang Pintu Lemari Bh 15,000
16 Grendel Jendela Kuningan Bh 36,600
17 Grendel Pintu Biasa Bh 10,450
18 Grendel Pintu Kuningan / Vertikal Bh 109,800
19 Grendel Pintu Besar Buah 36,600
20 Grendel Pintu Tanam (Expanyolet) Buah 209,000
21 Kunci Tanam Yale 1 x Putar Buah 119,100
22 Kunci Tanam Yale 2 x Putar Buah 136,600
27 Hak Angin Kecil Antik Buah 15,700
28 Hak Angin Besar Buah 26,200
29 Hak Angin - Kecil Buah 15,700
30 Kait angin Jendela Alumunium Kwalitas 1 Buah 15,700
31 Kait angin Jendela Alumunium - Biasa Buah 8,400
32 Hidrolic Gas spring (kait angin hidrolik) Buah 200,000
33 Rel pintu sorong w.500.80 Set 250,000
34 Handle Pintu Kaca Set 750,000
35 Door Closer Set 455,000
36 Door Holder Set 25,000
37 Door Stop Set 88,000
NO BAHAN MATERIAL DAN UPAH KERJA SATUAN HARGA (RP)
H BAHAN KACA
1 Kaca Bening 3 mm M2 109,800
2 Kaca Bening 5 mm M2 125,400
3 Kaca Bening 6 mm M2 229,900
4 Kaca Bening 8 mm M2 313,500
5 Kaca Bening 10 mm M2 438,900
6 Kaca Ryben Tebal 6 mm M2 418,000
7 Kaca Ryben Tebal 5 mm M2 135,850
8 Kaca Ryben Tebal 3 mm M2 114,950
9 Kaca Ryben Tebal 8 mm M2 611,400
10 Kaca Ryben Tebal 10 mm M2 246,400
11 Jendela Nako (Rangka+ Kaca Tebal 5mm) 0,6 m x 1 m M2 15,700
12 Kaca Es Buram 5 mm/ 10 mm M2 250,800
J BAHAN LANGIT-LANGIT
2 Teakwood 120 x 240 cm t.3mm Lembar 114,300
4 Triplex 3 mm 120 x 240 cm Lembar 45,000
5 Triplex 4 mm 120 x 240 cm Lembar 68,000
6 Triplex 5 mm Lembar 55,000
7 Triplex 6 mm 120 x 240 cm Lembar 65,000
8 Triplex 7 mm Lembar 135,900
9 Triplex 9 mm Lembar 140,000
10 Triplex 10 mm Lembar 188,100
11 Triplex 15 mm Lembar 214,300
12 Triplex 20 mm Lembar 255,400
13 Triplex Ukuran Pintu Lembar 101,900
14 Triplex Melamin 120 x 240 cm 3 mm Lembar 114,800
15 Teakwood 120 x 240 cm t.4mm Lembar 204,900
16 Multiplex 120 x 240 cm t. 6 mm Lembar 85,000
17 Multiplex 120 x 240 cm t. 9 mm Lembar 95,000
18 Multiplex 120 x 240 cm t. 12 mm Lembar 145,000
19 Multiplex 120 x 240 cm t. 18 mm Lembar 285,000
20 Gypsum Board 122x244x tebal 9 mm ex Jayaboard untuk Plafond Gpyro Lembar 68,000
37 Les Gypsum Profil Batang 25,200
K BAHAN LANTAI
1 Granit ukuran 60 x 60 cm Ex. Granito Polis bh 60275.00 Dos 241,100
2 Granit ukuran 60 x 60 cm Ex. Granito Unpolisd bh 83333.33 Dos 250,000
S UPAH KERJA
1 Mandor Lapangan O/H 176,000
2 Kepala Tukang O/H 153,000
3 Kepala Tukang Listrik O/H 153,000
4 Tukang Batu /Cat O/H 141,000
5 Tukang Kayu / besi O/H 141,000
6 Tukang Pasang Paving O/H 141,000
7 Mekanik O/H 141,000
8 Pekerja O/H 113,000
9 Sopir Terampil O/H 153,000
10 Biaya Pasang Canstein /M' 117,000
11 Biaya Pasang Paving /M2 153,000
PERATURAN MENTERI PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
NOMOR : 28/PRT/M/2016
ANALISA HARGA SATUAN PEKERJAAN (AHSP)
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 10% x D -
F Harga Satuan Pekerjaaan (D+E) -