KEGIATAN :
PEKERJAAN: PEMBANGUNAN RUMAH PANEL
LOKASI : KOTA KENYAM, KABUPATEN NDUGA
JUMLAH 348542198.0975
Mengetahui ;
KEPALA DINAS PENDIDIKAN DANIEL SATTU, ST
KOTA SORONG Team Leader
Dra. HERMIN S. M.
Pembina TK. I NIP. 131 121 367
47,112,675.60
4,626,084.64
16,288,271.70
70,559,886.49
39,807,892.72
15,399,237.07
74,149,406.95
-
-
2,637,854.35
-
10,379,652.92
5,230,860.25
3,931,633.32
290,123,456.00
290000000
290,000,000.00 290,123,456
LihatRUANG KELAS
UKURAN
I ~ UKURAN BANGUNAN : Ukuran
Panjang 8 m
~ Ruang Kelas : untuk
Lebar 7 m
Panjang 11 m Bordes
Tangga !!!..
Lebar 7 m JUMLAH RUANG KELAS
~ Selasar : 1 Ruang
Panjang 11 m
Lebar 1.5 m ~ Panjang Bangunan + Rabat = 13
TINGGI BANGUNAN ~ Lebar Bangunan + Selasar + Rabat = 10.5
3.5 m ~ Urugan Pasir :
Tebal bawah pondasi 0.05
Tebal bawah lantai 0.1
II ~ UKURAN PONDASI :
IV ~ UKURAN KUSEN :
~ PJ - 1 : JML Luas Bidang Panjang
~ Bagian Pintu : Kusen Balok Kusen
Lebar 0.92 1 2.576 m2 15.8 m
Tinggi 2.8
~ Bagian Jendela :
Lebar 1.52 1 2.888 m2
Tinggi 1.9
~J-1: JML
Lebar 2.34 2 6.3648 m2 24.92 m
Tinggi 1.36
~J-2: JML
Lebar 2.34 3 13.4082 m2 43.98 m
Tinggi 1.91
~ pintu : JML
Lebar 2.8 2 4.48 m2 14.4 m
Tinggi 0.8
~ pintu : JML
Lebar 2.16 1 1.728 m2 3.76 m
Tinggi 0.8
~ Ventilasi JML
Lebar 0.8 1 0.48 m2 2.8 m
Tinggi 0.6
~ MANUMATA : JML
Lebar 1 2 1.4 m2 4.8 m
Tinggi 0.7
~ Ukuran Pintu Panil : JML Ukuran Jalusi Pintu LUAS PENAMPANG 0.01
Lebar 0.82 5 0.8
Tinggi 2.1 0.58
~ KUDA-KUDA:
Panjang Jml Vol Sat
Balok Tarik 9.1 2 0.091 m3
Tiang Raja 2.32 1 0.0116 m3
Kaki Kuda2 5.6 2 0.056 m3
Balok Apit 4.6 2 0.046 m3
Skor Miring 2.4 2 0.024 m3
Skor Tegak 1.2 2 0.012 m3
0.2406 m3
~ GORDING:
Panjang Jml Vol Sat
ARAH X 13 16 1.04 m3
ARAH Y 0 0 0 m3 LUAS PENAMPANG 0.005
1.04 m3
~ SKOR ANGIN:
Panjang Jml Vol Sat
3.5 8 0.14 m3
~ BALOK NOK:
Panjang Jml Vol Sat
13 1 0.065 m3
~ FLOOR LANTAI:
Luasan Jml Tebal Vol Sat
RUANGAN 77 1 0.05 3.85 m3
SELASAR 16.5 1 0.05 0.825 m3
~ ATAP SENG:
Sisi Miring Panjang Jml Vol Sat
5.85 13 2 152.1 m2
~ NOK SENG:
Panjang Jml Vol Sat
13 1 13 m1
0 Pembersihan Lokasi 136.5 m2
Plesteran Dinding
~ Luas dinding segi tiga sisi luar 21.84
~ Luas dinding 301.1322
Jumlah 322.97 m2
16 Plesteran Lantai
Dalam Ruang Kelas 56.00
Selasar 16.50
Rabat 62.35
Jumlah 134.85 m2
Pek. Jalusi/Ventilasi
~ Jendela 7.714 m2
~ Pintu 2.32 m2
Total 10.034 m2
m2
Cat Jendela :
Jumlah 20.068 m2
Tiang Selasar : 7 m2
m2
Cat Jalusi/ventilasi :
PINTU
JENDELA
MANUMATA
Jalusi/ventilasi :
0 m2
0 m2
0 m2
0 m2
RENCANA ANGGARAN BIAYA Lihat
( R. A. B)
Ukuran
KEGIATAN : untuk
PEKERJAAN : PEMBANGUNAN RUMAH PANEL Bordes
LOKASI : KOTA KENYAM, KABUPATEN NDUGA Tangga
!!!..
NO URAIAN PEKERJAAN SAT. VOL. HARGA SATUAN JUMLAH
(Rp) (Rp)
I PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi m2 64.0 26,500.00 1,696,000.00
2 Pembuatan Gudang Alat dan Bahan (Uk. 3 X 3 m) m 2
16.00 1,180,600.00 18,889,600.00
3 Pengukuran/Pemasangan Bouwplank m' 16.00 63,350.00 1,013,600.00
4 Penyediaan Air Kerja Lapangan/Listrik ls 1.00 5,000,000.00 5,000,000.00
5 Mobilisasi dan Demobilisasi 2.00 15,000,000.00 30,000,000.00
Sub Jumlah ( I ) 56,599,200.00
II PEKERJAAN TANAH
1 Pek. Galian Tanah Pondasi m3 11.52 108,010.00 1,244,275.20
2 Pek. Galian Rolak & Saluran Pinggir Bangunan m 3
1.28 108,010.00 138,252.80
3 Pek. Urugan Kembali Tanah Galian Pondasi m3 3.84 33,170.00 127,372.80
4 Pek. Urugan Pasir bawah Pondasi m3 1.28 183,300.00 234,624.00
5 Pek. Urugan Pasir bawah Lantai m 3
3.20 183,300.00 586,560.00
6 Pek. Urugan Tanah Bawah Lantai m3 18.00 179,250.00 3,226,500.00
Sub Jumlah ( II ) 5,557,584.80
III PEKERJAAN PONDASI
1 Pas. Pondasi Batu Kosong m3 2.56 800,000.00 2,048,000.00
2 Pas. Pondasi Batu Gunung 1 Pc ; 4 Ps m3 7.04 2,488,643.33 17,520,049.07
Sub Jumlah ( III ) 19,568,049.07
IV PEKERJAAN DINDING
1 Pas. Dinding Batko/batu Tela 1 Pc : 4 Ps m2 30.64 1,697,302.33 52,005,343.49
2 Pas. Rolak Bata Merah tebal 1/2 bata 1 Pc : 3 Ps m2 12.00 2,730,196.33 32,762,356.00
3 pas.Loster Batu angin m2 4.44
Sub Jumlah ( IV ) 84,767,699.49
V PEKERJAAN PLESTERAN
1 Plesteran Dinding Dan Kolom 1 Pc : 4 Ps tebal 2 cm m2 184.68 168,084.33 31,041,814.68
Plesteran Beton m2 116.27
2 Acian Dinding dan Beton m2 300.95 55,762.50 16,781,724.38
Sub Jumlah ( V ) 47,823,539.06
VI PEKERJAAN KAYU
1 Pas. Kusen Pintu Besi inklud Daun Assesoreis (2 Daun) m3 1.00 18,500,000.00 18,500,000.00
2 Pas. Pintu Panel Kayu besi m 2
840,500.00 -
3 Pas. Jendela Kaca Kayu Besi m2 681,700.00 -
4 Pas. Jalusi Kayu besi m2 713,000.00 -
5 Pas. Konstruksi Kuda-kuda Baja Ringan m2 0.00 350,000.00 -
6 Pas. Gording Kayu besi 5/10 cm m3 350,000.00 -
7 Pas. Reng Dan Kaso Kayu besi m 2
77,000.00 -
8 Pas. Lisplank kayu besi m' 76,880.00 -
Sub Jumlah ( VI ) 18,500,000.00
VII PEKERJAAN BETON
1 Pek. Beton Tumbuk Lantai & Rabat 1 Pc : 3 Ps : 5 Kr m3 2.50 2,820,533.33 7,051,333.33
2 Pek. Sloof Beton Bertulang & Balok20/30 cm m3 0.96 7,788,378.33 7,476,843.20
3 Pek. Kolom Beton Bertulang 25/25 m3 0.81 8,841,478.33 7,183,701.15
Pek. Kolom Beton Bertulang 20/20 m 3
0.52 8,841,478.33 4,597,568.73
4 Pek. Plat Dack Beton Bertulang m3 3.19 9,586,348.33 30,561,278.49
5 Pek. Balok Atap Beton Bertulang m3 1.46 7,851,133.33 11,482,282.50
6 Pek. Balok Lisplan beton m 3
2.64 7,851,133.33 20,726,992.00
Sub Jumlah ( VII ) 89,079,999.40
VIII PEKERJAAN PENUTUP ATAP
1 Pas. Atap Seng Gelombang m2 -
2 Pas. Nok Plat Multyroof BJLS 30 m2 -
3 Pek Lisplan Kayu Besi m -
Sub Jumlah ( VIII ) -
IX PEKERJAAN PLAFOND/LANGIT-LANGIT
1 Pek. Plafond Gypsum + Rangka Kayu besi m2 195,000.00 -
2 Pek. Lis Profil Plafond Gypsum m' 22,000.00 -
3 Pek. Plafond Tripleks 4 mm + Rangka Kayu besi m2 213,025.00 -
4 Pek. Lis Profil Plafond m' 23,640.00 -
Sub Jumlah ( IX ) -
X PEKERJAAN SANITASI
1 Pas. Pipa PVC 3/4" untuk air bersih m' 54,784.00 -
2 Pas. Pipa PVC 2 " untuk air Kotor m' 158,634.00 -
3 Pasangan Floor Drain m' 41,850.00 -
4 Pas. Pipa PVC 4" untuk air Hujan m' 16.00 198,063.00 3,169,008.00
ANALISA LAIN-LAIN
SUPL.2 1 M1 PASANGAN SALURAN PINGGIR BANGUNAN
~ Bahan :
a Batu bata bh 35.000 36,000.00 1,260,000.00 1,260,000.00
b Portland Cemen kg 10.000 8,900.00 89,000.00 89,000.00
c Pasir Pasang m3 0.038 216,333.33 8,220.67 8,220.67
d Plesteran m2 0.850 187,819.67 159,646.72 159,646.72
e Acian m2 0.850 55,762.50 47,398.13 47,398.13
~ Upah :
f Pekerja oh 0.100 150,000.00 15,000.00 15,000.00
g Tukang batu oh 0.150 200,000.00 30,000.00 30,000.00
h Kepala Tukang batu oh 0.0490 220,000.00 10,780.00 10,780.00
i Mandor oh 0.0120 230,000.00 2,760.00 2,760.00
Total Rp 58,540.00 1,564,265.51 1,622,805.51
Total Harga Rp 1,622,805.51
ANALISA FURNITURE
M.04 1 UNIT MEJA BACA KELOMPOK
a Kayu Kelas I m3 0.0386 2,600,000.00 100,360.00 100,360.00
b Paku Ulir bh 24.000 5,000.00 120,000.00 120,000.00
c Amplas lbr 2.000 5,000.00 10,000.00 10,000.00
d Dempul Kayu kg 0.200 19,000.00 3,800.00 3,800.00
e Lem Kayu kg 0.100 45,000.00 4,500.00 4,500.00
f Politur kg 0.750 55,000.00 41,250.00 41,250.00
g Upah ls 1.000 300,000.00 300,000.00 300,000.00
Total Rp 300,000.00 279,910.00 579,910.00
Total Harga Rp 579,910.00
M.07 1 UNIT MEJA KERJA
a Kayu Kelas I m3 0.104 2,600,000.00 270,920.00 270,920.00
b Paku Ulir bh 20.000 5,000.00 100,000.00 100,000.00
c Rel Laci bh 2.000 15,000.00 30,000.00 30,000.00
d Knop Tarikan bh 2.000 25,000.00 50,000.00 50,000.00
e Amplas lbr 4.000 5,000.00 20,000.00 20,000.00
f Dempul Kayu kg 0.400 19,000.00 7,600.00 7,600.00
g Minyak Cat ltr 0.500 45,000.00 22,500.00 22,500.00
h Lem Kayu kg 0.270 45,000.00 12,150.00 12,150.00
i Politur kg 1.000 55,000.00 55,000.00 55,000.00
j Upah ls 1.000 500,000.00 500,000.00 500,000.00
Total Rp 500,000.00 568,170.00 1,068,170.00
Total Harga Rp 1,068,170.00
K.05 1 UNIT KURSI KERJA
a Kayu Kelas I m3 0.013 2,600,000.00 33,800.00 33,800.00
b Paku Ulir bh 20.000 5,000.00 100,000.00 100,000.00
c Amplas lbr 2.000 5,000.00 10,000.00 10,000.00
d Dempul Kayu kg 0.100 19,000.00 1,900.00 1,900.00
e Minyak Cat ltr 0.500 45,000.00 22,500.00 22,500.00
f Lem Kayu kg 0.030 45,000.00 1,350.00 1,350.00
g Politur kg 0.250 55,000.00 13,750.00 13,750.00
h Upah ls 1.000 200,000.00 200,000.00 200,000.00
Total Rp 200,000.00 183,300.00 383,300.00
Total Harga Rp 383,300.00
L.03 1 UNIT LEMARI ARSIP
a Kayu Kelas I m3 0.250 2,600,000.00 650,000.00 650,000.00
b Knop Tarikan bh 2.000 25,000.00 50,000.00 50,000.00
c Paku Ulir bh 24.000 5,000.00 120,000.00 120,000.00
d Sekrup 5 cm bh 12.000 1,000.00 12,000.00 12,000.00
e Kunci bh 1.000 35,000.00 35,000.00 35,000.00
f Grendel m 2.000 12,500.00 25,000.00 25,000.00
g Tripleks 3 mm lbr 1.450 50,000.00 72,500.00 72,500.00
h Amplas lbr 3.000 5,000.00 15,000.00 15,000.00
i Dempul Kayu kg 0.300 19,000.00 5,700.00 5,700.00
j Lem Kayu kg 0.300 45,000.00 13,500.00 13,500.00
k Politur kg 1.500 55,000.00 82,500.00 82,500.00
l Upah ls 1.000 1,000,000.00 1,000,000.00 1,000,000.00
Total Rp 1,000,000.00 1,081,200.00 2,081,200.00
Total Harga Rp 2,081,200.00
L.06 1 UNIT LEMARI ALAT PERAGA
a Kayu Kelas I m3 0.187 2,600,000.00 486,200.00 486,200.00
b Knop Tarikan bh 2.000 15,000.00 30,000.00 30,000.00
c Paku Ulir bh 24.000 5,000.00 120,000.00 120,000.00
d Sekrup 5 cm bh 12.000 1,000.00 12,000.00 12,000.00
e Kunci bh 1.000 35,000.00 35,000.00 35,000.00
f Grendel bh 2.000 12,500.00 25,000.00 25,000.00
g Engsel Pita m 4.000 25,000.00 100,000.00 100,000.00
h Tripleks 3 mm lbr 0.726 50,000.00 36,300.00 36,300.00
i Amplas lbr 3.000 5,000.00 15,000.00 15,000.00
j Dempul Kayu kg 0.300 19,000.00 5,700.00 5,700.00
K Lem Kayu kg 0.300 45,000.00 13,500.00 13,500.00
L Politur kg 1.500 55,000.00 82,500.00 82,500.00
m Upah ls 1.000 950,000.00 950,000.00 950,000.00
Total Rp 950,000.00 961,200.00 1,911,200.00
Total Harga Rp 1,911,200.00
L.14 1 UNIT LEMARI GANTUNG/ P3K
a Kayu Kelas I m3 0.128 2,600,000.00 332,800.00 332,800.00
b Knop Tarikan bh 2.000 15,000.00 30,000.00 30,000.00
c Paku Ulir bh 25.000 5,000.00 125,000.00 125,000.00
d Sekrup 5 cm bh 12.000 1,000.00 12,000.00 12,000.00
e Kaca 5 mm m2 0.350 190,000.00 66,500.00 66,500.00
f Engsel Pita bh 4.000 25,000.00 100,000.00 100,000.00
g Tripleks 3 mm lbr 0.240 50,000.00 12,000.00 12,000.00
h Amplas lbr 2.000 5,000.00 10,000.00 10,000.00
i Dempul Kayu kg 0.050 19,000.00 950.00 950.00
j Lem Kayu kg 0.100 45,000.00 4,500.00 4,500.00
K Politur kg 0.500 55,000.00 27,500.00 27,500.00
L Upah ls 1.000 600,000.00 600,000.00 600,000.00
Total Rp 600,000.00 721,250.00 1,321,250.00
Total Harga Rp 1,321,250.00
R.02 1 UNIT RAK BUKU SATU MUKA
a Kayu Kelas I m3 0.151 2,600,000.00 392,600.00 392,600.00
b Paku Ulir bh 48.000 5,000.00 240,000.00 240,000.00
c Sekrup 5 cm bh 24.000 1,000.00 24,000.00 24,000.00
d Tripleks 3 mm lbr 0.726 50,000.00 36,300.00 36,300.00
e Amplas lbr 3.000 5,000.00 15,000.00 15,000.00
f Dempul Kayu kg 0.300 19,000.00 5,700.00 5,700.00
g Lem Kayu kg 0.300 45,000.00 13,500.00 13,500.00
h Politur kg 1.500 55,000.00 82,500.00 82,500.00
I Upah ls 1.000 850,000.00 850,000.00 850,000.00
Total Rp 850,000.00 809,600.00 1,659,600.00
Total Harga Rp 1,659,600.00
R.02 1 UNIT RAK BUKU DUA MUKA
a Kayu Kelas I m3 0.227 2,600,000.00 590,200.00 590,200.00
b Paku Ulir bh 48.000 5,000.00 240,000.00 240,000.00
c Sekrup 5 cm bh 30.000 1,000.00 30,000.00 30,000.00
d Tripleks 3 mm lbr 1.000 50,000.00 50,000.00 50,000.00
e Amplas lbr 2.000 5,000.00 10,000.00 10,000.00
f Dempul Kayu kg 0.300 19,000.00 5,700.00 5,700.00
g Lem Kayu kg 0.300 45,000.00 13,500.00 13,500.00
h Politur kg 1.500 55,000.00 82,500.00 82,500.00
I Upah ls 1.000 900,000.00 900,000.00 900,000.00
Total 900,000.00 1,021,900.00 1,921,900.00
Total Harga Rp 1,921,900.00
KS 1 UNIT KOTAK SAMPAH
a Kayu Kelas I m3 0.051 2,600,000.00 133,824.05 133,824.05
b Paku Ulir bh 19.000 5,000.00 95,000.00 95,000.00
c Amplas lbr 1.000 5,000.00 5,000.00 5,000.00
d Dempul Kayu kg 0.050 19,000.00 950.00 950.00
e Lem Kayu kg 0.050 45,000.00 2,250.00 2,250.00
f Politur kg 0.100 55,000.00 5,500.00 5,500.00
g Upah ls 1.000 100,000.00 250,000.00 250,000.00
Total 250,000.00 242,524.05 492,524.05
Total Harga Rp 492,524.05
U.07 1 UNIT DIPAN TIDUR TUNGGAL
a Kayu Kelas I m3 0.086 2,600,000.00 223,600.00 223,600.00
b Paku Ulir bh 8.000 5,000.00 40,000.00 40,000.00
c Sekrup 5 cm bh 8.000 1,000.00 8,000.00 8,000.00
d Tripleks 3 mm lbr 0.537 50,000.00 26,850.00 26,850.00
e Amplas lbr 1.000 5,000.00 5,000.00 5,000.00
f Dempul Kayu kg 0.050 19,000.00 950.00 950.00
g Lem Kayu kg 0.050 45,000.00 2,250.00 2,250.00
h Politur kg 0.500 55,000.00 27,500.00 27,500.00
i Upah ls 1.000 350,000.00 350,000.00 350,000.00
Total Rp 350,000.00 334,150.00 684,150.00
Total Harga Rp 684,150.00
ANALISA PEKERJAAN LISTRIK
Kode Keterangan Sat. Volume Harga Satuan Jumlah
(Rp)
a b c d e f
1 BOX SEKRING MCB
Material
a BoX SEKRING MCB 2 group set 1.00 50,000.00 50,000.00
b MCB 1P/6A, 6 KA bh 2.00 55,000.00 110,000.00
c MCB 1P/10A, 6 KA bh 2.00 55,000.00 110,000.00
Tenaga
a Tukang Listrik oh 0.17 200,000.00 34,000.00
b Pekerja oh 0.17 150,000.00 25,500.00
Set 329,500.00
2 PAS. INSTALASI LISTRIK
Material
a Kabel NYM 2 x 2,5 m 21.00 17,000.00 357,000.00
b Konduit 20 mm m 5.60 6,000.00 33,600.00
c Alat bantu (isolasi, clamp dll) ls 1.00 1,500.00 1,500.00
Tenaga
a Tukang Listrik oh 0.13 200,000.00 26,000.00
b Pekerja oh 0.13 150,000.00 19,500.00
Titik 437,600.00
3 PEMASANGAN LAMPU PHILIPS PIJAR 15 WATT
Material
a Lampu Philips Pijar 15 Watt bh 1.00 5,000.00 5,000.00
b Alat bantu (isolasi, clamp dll) ls 1.00 1,000.00 1,000.00
Tenaga
a Tukang Listrik oh 0.17 200,000.00 34,000.00
b Pekerja oh 0.17 150,000.00 25,500.00
Set 65,500.00
4 PEMASANGAN LAMPU SL PHILIPS 23 WATT
Material
a Lampu SL Philips 23 Watt bh 1.00 35,000.00 35,000.00
b Alat bantu (isolasi, clamp dll) ls 1.00 1,000.00 1,000.00
Tenaga
a Tukang Listrik oh 0.17 200,000.00 34,000.00
b Pekerja oh 0.17 150,000.00 25,500.00
Set 95,500.00
5 PAS. STOP KONTAK
Material
a Stop Kontak komplit bh 1.00 17,000.00 17,000.00
b Alat bantu (isolasi, clamp dll) ls 1.00 1,000.00 1,000.00
Tenaga
a Tukang Listrik oh 0.17 200,000.00 34,000.00
b Pekerja oh 0.17 150,000.00 25,500.00
Set 77,500.00
6 PAS. SAKLAR TUNGGAL INBOW
Material
a Saklar engkel bh 1.00 15,000.00 15,000.00
b Alat bantu (isolasi, clamp dll) ls 1.00 1,000.00 1,000.00
Tenaga
a Tukang Listrik oh 0.17 200,000.00 34,000.00
b Pekerja oh 0.17 150,000.00 25,500.00
Set 75,500.00
7 PAS. SAKLAR GANDA INBOW
Material
a Saklar ganda bh 1.00 22,000.00 22,000.00
b Alat bantu (isolasi, clamp dll) ls 1.00 1,000.00 1,000.00
Tenaga
a Tukang Listrik oh 0.17 200,000.00 34,000.00
b Pekerja oh 0.17 150,000.00 25,500.00
Set 82,500.00
8 KABEL SUPLAY MAIN KE SUB PANIL
Material
a Konduit 20 mm m 5.60 6,000.00 33,600.00
b Alat bantu (isolasi, clamp dll) ls 1.00 1,000.00 1,000.00
Tenaga
a Tukang Listrik oh 0.03 200,000.00 6,000.00
b Pekerja oh 0.03 150,000.00 4,500.00
M' 45,100.00
DAFTAR ANALISA MEUBELAIR/FURNITURE
NO URAIAN SAT. INDEKS SAT. HARGA JUMLAH
1 Buah Meja Murid ( M - 01 )
A BAHAN
a Papan Kayu Kelas I m3 0.06178 3,100,000.00 191,518.00
b Balok Kayu Kelas I m3 0.01500 2,600,000.00 39,000.00
c Tripleks 9 mm lbr 0.13530 180,000.00 24,354.00
d Paku kg 0.2000 15,000.00 3,000.00
B PEK. POLITUR
e Politur kg 0.80000 35,000.00 28,000.00
f Minyak Cat ltr 0.50000 25,000.00 12,500.00
g Tukang org 0.40000 200,000.00 80,000.00
h Kepala Tukang org 0.27000 220,000.00 59,400.00
C UPAH KERJA
i Pekerja org 2.08700 150,000.00 313,050.00
j Tukang Kayu org 3.33400 200,000.00 666,800.00
k Kepala Tukang org 0.44000 220,000.00 96,800.00
l Mandor org 0.18200 230,000.00 41,860.00
Total Harga Rp 1,556,282.00
4
0.01
1.90
0.0029
0.00066
0.005661
0.005457
0.01
0.0366
62,400.00
1,117,000.00
#REF!
#REF!
#REF!
0.04366
0.02912 0.07278
1,661,674.00
630,799.40
116,500.00
1,198,200.00
156,600.00
110,200.00
0.14625
0.585
0.0117
1.6
0.00096
#REF!
0.001463
0.01609
DAFTAR HARGA BAHAN DAN UPAH
A. HARGA BAHAN/MATERIAL
No Nama Bahan Satuan Harga (Rp)
BAHAN DASAR
1 Batu Gunung m3 Rp 500,000.00
2 Batako/Batu Tela bh Rp 36,000.00
3 Kapur kg
4 Kerikil/split 2 - 3 m3 Rp 500,000.00
5 Pasir Pasang m 3
Rp 216,333.33
6 Pasir Plester m 3
Rp 266,333.33
7 Pasir Beton m 3
Rp 238,333.33
8 Pasir Urug m3 Rp 113,333.33
9 Semen PC 50 kg Zak Rp 445,000.00
9 Semen PC 50 kg kg Rp 8,900.00
10 Semen Warna kg Rp 10,000.00
11 Sirtu m3 Rp 210,000.00
12 Tanah Timbun m3 Rp 113,333.33
BAHAN ATAP
1 Seng Multiroof BJLS 0.30 lbr Rp 75,000.00
2 Seng Nok Multiroof BJLS 0.30 lbr Rp 50,000.00
BAHAN SANITASI
1 Kloset Jongkok bh Rp 225,000.00
2 Kran Air Dia 3/4" bh Rp 65,000.00
3 Seal Tape bh Rp 5,000.00
4 Floor Drain bh Rp 17,000.00
5 Pipa PVC Dia 3/4" m1 Rp 23,000.00
6 Pipa PVC Dia 2 " m1 Rp 90,000.00
7 Pipa PVC Dia 4" m1 Rp 100,000.00
BAHAN KUNCI dan PENGGANTUNG
1 Engsel Pintu psg Rp 7,000.00
2 Engsel Jendela psg Rp 6,000.00
3 Grendel Biasa bh Rp 12,500.00
4 Hak / Kait Angin Biasa psg Rp 15,000.00
5 Kunci Tanam 2 Putar bh Rp 135,000.00
6 Tarikan Jendela bh Rp 12,500.00
7 Engsel Lemari m1 Rp 6,666.67
8 Grendel Lemari bh Rp 5,000.00
9 Kunci Lemari bh Rp 12,000.00
10 Knop Tarikan Lemari bh Rp 15,000.00
BAHAN CAT
1 Cat Kayu Merk Avian atau sejenis kg Rp 45,000.00
2 Cat Atap kg Rp 26,000.00
3 Cat Meni Kayu Altex kg Rp 23,000.00
4 Cat Tembok ; merk Aries kg Rp 7,000.00
5 Cat Papan Tulis kg Rp 28,000.00
6 Dempul Kayu Merk Kembang kg Rp 19,000.00
7 Plamur Tembok Merk Boyo kg Rp 8,000.00
8 Plamur Kayu Fico kg Rp 19,000.00
9 Thinner/Minyak Cat ltr Rp 25,000.00
10 Politur kg Rp 35,000.00
11 Lem Kayu FOX kg Rp 40,000.00
12 Amplas lbr Rp 3,500.00
BAHAN LISTRIK
1 Kabel NYM 2 x 2,5 mm2 m Rp 17,000.00
2 Box Seking Otomat 2 Group (Presto) bh Rp 50,000.00
3 MCB 1P/10A, 6 KA bh Rp 55,000.00
4 MCB 1P/6A, 6 KA bh Rp 55,000.00
5 Lampu SL 23 Watt Philips bh Rp 35,000.00
6 Lampu Pijar 15 Watt Philips bh Rp 5,000.00
7 Saklar Tunggal broco bh Rp 15,000.00
8 Saklar Ganda broco bh Rp 22,000.00
9 Stop Kontak broco bh Rp 17,000.00
10 Konduit 20 mm m Rp 6,000.00
B. HARGA UPAH
No Uraian Satuan Harga (Rp)
• v_x0000_E
Rp 200.000,00
Rp 220.000,00
Rp 270.000,00
Rp 400.000,00