Anda di halaman 1dari 35

HARGA PERKIRAAN SENDIRI

SATUAN KERJA : KANTOR PELAYANAN PAJAK PRATAMA PALU


PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR PELAYANAN PAJAK PRATAMA PALU
LOKASI : KOTA PALU
TAHUN ANGGARAN : 2021
PAGU KONSTRUKSI : Rp 23,904,925,000.00

REKAPITULASI ANGGARAN BIAYA KONSTRUKSI


No URAIAN PEKERJAAN JUMLAH HARGA

A. PEKERJAAN GEDUNG
I PEKERJAAN PERSIAPAN
II SEGMEN GEDUNG PELAYANAN (SGP)
PEKERJAAN TANAH SGP
PEKERJAAN STRUKTURAL SGP
PEKERJAAN ARSITEKTURAL SGP
III SEGMEN GEDUNG STAF (SGS)
PEKERJAAN TANAH SGS
PEKERJAAN STRUKTURAL SGS
PEKERJAAN ARSITEKTURAL SGS
IV SEGMEN GEDUNG STAF (SGA)
PEKERJAAN TANAH SGA
PEKERJAAN STRUKTURAL SGA
PEKERJAAN ARSITEKTURAL SGA
V PEKERJAAN MEKANIKAL
VI PEKERJAAN ELEKTRIKAL
A).REKAP - PEKERJAAN GEDUNG

B PEKERJAAN FASUM
I PEKERJAAN POS PENJAGAAN MASUK
II PEKERJAAN POS PENJAGAAN KELUAR
III PEKERJAAN RUANG POMPA, GWT DAN RUANG GENSET
IV PEKERJAAN TIANG BENDERA DAN SKUPTURL
V PEKERJAAN JALAN DAN LANDSCAPE RUANG TERBUKA HIJAU
VI PEKERJAAN PAGAR
VI PEKERJAAN KANTIN (KONTAINER CUSTOM)
B). REKAP - PEKERJAAN FASUM

C PEKERJAAN INTERIOR
I PEKERJAAN INTERIOR SGP
II PEKERJAAN INTERIOR SGS
III PEKERJAAN INTERIOR SGA
C). REKAP - PEKERJAAN INTERIOR

REAL COST BIAYA KONSTRUKSI (A + B + C) 21,519,894,599.81


PPN 10 % 2,151,989,459.98
TOTAL BIAYA KONSTRUKSI Rp 23,671,884,059.79
PEMBULATAN TOTAL BIAYA KONSTRUKSI DALAM RIBUAN Rp 23,671,884,000.00

Pejabat Pembuat Komitmen


KPP Pratama Palu
RENCANA ANGGARAN BIAYA
SATUAN KERJA : KANTOR PELAYANAN PAJAK PRATAMA PALU
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR PELAYANAN PAJAK PRATAMA PALU
LOKASI : KOTA PALU
TAHUN ANGGARAN : 2021

No Kode Type URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
ANALISA Pekerjaan
a b c d e f g h=fxg
DIVISI 2 - SITE WORK
I PEKERJAAN PERSIAPAN
1 Standar Pek. Pembuatan Papan Proyek Set 1.00
Pek. Pembuatan Barak Pekerja (Rangka Kayu Lokal + Papan Lokal +
2 Standar Atap Seng) Set 1.00

3 Standar Pek. Direksi Keet (Rangka Kayu Lokal + Multipleks 6mm + Atap Seng) Set 1.00

4 Standar Pek. Pengukuran Dan Pemasangan Bowplank Set 1.00


5 Standar Pek. Pagar Seng Pengamanan Proyek Set 1.00
6 Standar Uji Kuat Tekan Beton Set 1.00
7 Standar Biaya Pemindahan dan Penanaman Kembali 3 Pohon Eboni Eksisting Set 1.00
8 Standar Biaya Pembongkaran Pondasi Lama Set 1.00
9 Standar Biaya Pembongkaran Pagar Eksisting Set 1.00
10 Standar Biaya Buangan Hasil Bongkaran Set 1.00
11 Standar Pek. Pembersihan Lokasi Set 1.00
12 Standar Pek. Biaya Pemindahan Genset Eksisting (Include transportasi & Set 1.00
Instalatir)
13 Standar Biaya K3 Konstruksi Dan Pencegahan Covid 19 Set 1.00
14 Standar Biaya PDA Test 3 titik titik 3.00
JUMLAHPEKERJAAN PERSIAPAN
II SEGMEN GEDUNG PELAYANAN (SGP)
PEKERJAAN TANAH SGP
A Pekerjaan Tanah Area Poer Plat Dan Pondasi Batu Kali
1 Standar Pek. Galian Tanah M3 235.92
2 Standar Pek. Buangan Bekas Galian (Di Gunakan Sebagai Timbunan) M3 193.43
3 Standar Pek. Urugan Kembali Bekas Galian M3 42.49
4 Standar Pek. Urugan Pasir M3 8.62
B Pekerjaan Tanah Area Saluran Keliling
1 Standar Pek. Galian Tanah M3 55.00
2 Standar Pek. Buangan Bekas Galian M3 55.00
3 Standar Pek. Urugan Pasir M3 5.50
C Pekerjaan Peninggian Lantai
1 Standar Pek. Timbunan Sirtu M3 211.64
2 Standar Pek. Pemadatan Tanah M3 27.65
3 Standar Pek. Urugan Pasir M3 27.65
4 Standar Pek. Tanah Subur M3 37.47
JUMLAH PEKERJAAN TANAH SGP
TOTAL BIAYA DIVISI 2 - SITE WORK
DIVISI 3 - PEKERJAAN STRUKTUR
III PEKERJAAN STRUKTURAL SGP
III.1 PEKERJAAN STRUKTUR ATAS SGP
A Pekerjaan Cor Rabat Lantai
1 Standar Pek. Lantai Kerja M3 27.65
2 Standar Pek. Beton K250 M3 53.57
3 Standar Pek. Pembesian Kg 2180.61
B Pekerjaan Kolom 30x60
1 Standar Pek. Beton K250 M3 1.94
2 Standar Pek. Pembesian Kg 399.71
3 Standar Pek. Bekisting M2 19.44
C Pekerjaan Kolom 30x40
1 Standar Pek. Beton K250 M3 11.54
2 Standar Pek. Pembesian Kg 2623.60
3 Standar Pek. Bekisting M2 134.68
D Pekerjaan Kolom 15x30
1 Standar Pek. Beton K250 M3 1.24
2 Standar Pek. Pembesian Kg 234.07
RENCANA ANGGARAN BIAYA
SATUAN KERJA : KANTOR PELAYANAN PAJAK PRATAMA PALU
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR PELAYANAN PAJAK PRATAMA PALU
LOKASI : KOTA PALU
TAHUN ANGGARAN : 2021

No Kode Type URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
ANALISA Pekerjaan
a b c d e f g h=fxg
3 Standar Pek. Bekisting M2 24.80
E Pekerjaan Kolom Praktis Dan Balok Praktis
1 Standar Pek. Kolom (Termasuk Bekisting Dan Pembesian) M' 117.33
2 Standar Pek. Balok (Termasuk Bekisting Dan Pembesian) M' 150.67
RENCANA ANGGARAN BIAYA
SATUAN KERJA : KANTOR PELAYANAN PAJAK PRATAMA PALU
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR PELAYANAN PAJAK PRATAMA PALU
LOKASI : KOTA PALU
TAHUN ANGGARAN : 2021

No Kode Type URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
ANALISA Pekerjaan
a b c d e f g h=fxg
F Pekerjaan Meja Beton
1 Standar Pek. Beton K 100 M3 0.11
2 Standar Pek. Pembesian Kg 11.04
3 Standar Pek. Bekisting M2 1.05
G Pekerjaan Balok 30x60
1 Standar Pek. Beton K250 M3 1.96
2 Standar Pek. Pembesian Kg 145.40
3 Standar Pek. Bekisting M2 12.30
H Pekerjaan Balok 25x50
1 Standar Pek. Beton K250 M3 16.75
2 Standar Pek. Pembesian Kg 2362.75
3 Standar Pek. Bekisting M2 147.07
I Pekerjaan Balok 20x40
1 Standar Pek. Beton K250 M3 0.69
2 Standar Pek. Pembesian Kg 135.09
3 Standar Pek. Bekisting M2 9.40
J Pekerjaan Balok 20x30
1 Standar Pek. Beton K250 M3 7.45
2 Standar Pek. Pembesian Kg 1164.27
3 Standar Pek. Bekisting M2 83.88
K Pekerjaan Plat Dak
1 Standar Pek. Beton K250 M3 16.45
2 Standar Pek. Pembesian Kg 1847.06
3 Standar Pek. Bekisting M2 172.69
L Pekerjaan Struktur Atap Baja
1 Non Standar Pek. Rangka Baja BJ 37 Uk. 125x250x6x9 Kg 5046.80
2 Non Standar Pek. Balok CNP 125x50x20x2,3 Kg 509.48
3 Non Standar Pek. Gording CNP 100x50x20x2,3 Kg 2808.40
3 Non Standar Pek. Angkur Baut Ø 16 HTB ST60 Bh 176.00
4 Non Standar Pek. Base Plate BJ 37 Uk. 175X300X10 Kg 90.67
JUMLAH PEKERJAAN STRUKTUR ATAS SGP
III.2 PEKERJAAN STRUKTUR BAWAH SGP
A Pekerjaan Poerplat
1 Standar Pek. Lantai Kerja M3 4.76
2 Standar Pek. Beton-K250 M3 23.70
3 Standar Pek. Pembesian Kg 2646.77
4 Standar Pek. Bekisting M2 46.50
B Pekerjaan Pondasi Batu
1 Standar Pek. Pasangan Batu Kosong M3 15.04
2 Standar Pek. Pondasi Batu M3 42.71
C Pekerjaan Tie Beam 20/40
1 Standar Pek. Lantai Kerja M3 0.57
2 Standar Pek. Beton-K250 M3 11.37
3 Standar Pek. Pembesian Kg 1471.04
4 Standar Pek. Bekisting M2 113.65
D Pekerjaan Kolom Pedestal 30x60
1 Standar Pek. Beton K250 M3 0.77
2 Standar Pek. Pembesian Kg 192.54
3 Standar Pek. Bekisting M2 7.74
E Pekerjaan Kolom Pedestal 30x40
1 Standar Pek. Beton K250 M3 4.64
2 Standar Pek. Pembesian Kg 1268.70
3 Standar Pek. Bekisting M2 54.18
F Pekerjaan Pondasi Tiang (dalam 7 m)
1 Standar Pengadaan tiang pancang Dia.30 spun pile runcing (panjang 7 m) Btg 37.00
2 Standar Biaya pemancangan (Hammer Diesel) + alat erection M' 259.00
RENCANA ANGGARAN BIAYA
SATUAN KERJA : KANTOR PELAYANAN PAJAK PRATAMA PALU
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR PELAYANAN PAJAK PRATAMA PALU
LOKASI : KOTA PALU
TAHUN ANGGARAN : 2021

No Kode Type URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
ANALISA Pekerjaan
a b c d e f g h=fxg
Include alat erection, Mobilisasi alat, bahan bakar, & operator
3 Standar Biaya Pemotongan Kepala Tiang Pancang Btg 37.00
JUMLAH PEKERJAAN STRUKTUR BAWAH SGP
TOTAL BIAYA DIVISI 3 - PEKERJAAN STRUKTUR
RENCANA ANGGARAN BIAYA
SATUAN KERJA : KANTOR PELAYANAN PAJAK PRATAMA PALU
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR PELAYANAN PAJAK PRATAMA PALU
LOKASI : KOTA PALU
TAHUN ANGGARAN : 2021

No Kode Type URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
ANALISA Pekerjaan
a b c d e f g h=fxg
DIVISI 4 - PEKERJAAN ARSITEKTUR
IV PEKERJAAN ARSITEKTURAL SGP
IV.1 PEKERJAAN FINISHING DINDING
1 Standar Pek. Pasangan Dinding 1/2 Bata, Camp. 1 Pc : 5 Ps M2 609.04
2 Standar Pek. Pasangan Dinding bata ringan 200x600x75 + MU 380 M2 87.84
3 Standar Pek. Plesteran Bata Ringan (MU 301) M2 175.68
4 Standar Pek. Plesteran Dinding, Campuran 1 Pc : 5 Ps, tebal 15 mm M2 1218.08
5 Standar Pek. Acian Dinding M2 1111.24
Standar Pek. Dinding Homogenus Tile Ukuran 30 X 60 cm Area KM/WC (Full M2 94.61
6 Dinding)
JUMLAH PEKERJAAN FINISHING DINDING
IV.2 PEKERJAAN FASADE
1 Non Standar Pek. Aluminium Composite Panel Blue Colour PVDF + Rangka Besi
Hollow M2 105.31

2 Non Standar Pek. Aluminium Composite Panel Yellow Colour PVDF + Rangka Besi M2 21.46
Hollow
Pek. Aluminium Composite Panel Grey Colour PVDF + Rangka Besi
3 Non Standar Hollow M2 300.77
4 Non Standar Pek. Curtain Wall (CW1) Kaca Stopsol Tempered Uk. 5mm Set 1.00
5 Non Standar Pek. Curtain Wall (CW2) Kaca Stopsol Tempered Uk. 5mm Set 1.00
6 Non Standar Pek. Curtain Wall (CW3) Kaca Stopsol Tempered Uk. 5mm Set 1.00
7 Non Standar Pek. Pilar Atap Pipa BSP 10" + Finish Coating M' 18.50
8 Standar Pek. Batu Alam M2 65.00
9 Standar Pek. Ventilasi Kaca Acrylic Kuning + Rangka Alluminium Unit 8.00
10 Standar Pek. Plester Ciprat M2 70.26
11 Standar Pek. Logo Gedung Dan Papan Nama + Lampu LED (Area Depan) M2 19.70
JUMLAH PEKERJAAN FASADE
IV.3 PEKERJAAN INTERIOR GEDUNG
1 Non Standar Pek. Dudukan Lampu LED Strip (sesuai design gambar Interior A24 & Bh 10.00
A30)
2 Non Standar Pek. Railing Ramp Entrance M' 18.20
3 Non Standar Pek. Partisi Ruang Konseling Dan Rg Loket TPT (Gypsum muka M2 61.50
belakang+rangka allumunium)
4 Non Standar Pek. Partisi Ruang Konsultasi (WPC Kisi-Kisi) M2 111.61
5 Non Standar Pek. Cover Column ( ACP Type PE ) M2 18.34
6 Non Standar Pek. Backdrop Loket TPT Set 1.00
7 Non Standar Pek. Logo Dan Papan Nama Acrylic Timbul (Area Backdrop TPT) M2 1.96
8 Non Standar Pek. Partisi Interior kamar Mandi (Cubicle) M2 15.10
9 Non Standar Pek. Karpet Rumput Sintetis Area Kids Zone M2 12.52
10 Non Standar Pagar Kisd Zone (Bahan Plastik) Set 1.00
JUMLAH PEKERJAAN INTERIOR GEDUNG
IV.4 PEKERJAAN FINISHING LANTAI
1 Standar Pek. Step Nozing Area Tangga M' 112.10
2 Standar Pek. Tegel Homogenus Tile Type Unpolished Uk. 60 X 60 cm M2 97.11
3 Standar Pek. Tegel Homogenus Tile Type Polished Ukuran 60 X 60 cm M2 464.74
4 Standar Pek. Lantai Batu Sikat Area Ramp M2 34.03
5 Standar Pek. Plint Homogenus Tile 10x60 M' 113.50
6 Standar Pek. Tegel Homogenus Tile Type Polished Ukuran 60 X 60 cm (Meja M2 1.05
Wastafel)
Pek. Lantai Vinyl (Rg. Konseling dan Rest Area dan TPT Area) merk
7 Standar M2 160.59
forbo
JUMLAH PEKERJAAN FINISHING LANTAI
IV.5 PEKERJAAN PINTU, JENDELA DAN VENTILASI
1 Non Standar Pek. Pintu Dan Jendela (PJ1) + Aksesoris Set 1.00
2 Non Standar Pek. Pintu (P2) + Aksesoris Set 1.00
3 Non Standar Pek. Pintu (P3) + Aksesoris Set 5.00
4 Non Standar Pek. Pintu (P5) + Aksesoris Set 1.00
RENCANA ANGGARAN BIAYA
SATUAN KERJA : KANTOR PELAYANAN PAJAK PRATAMA PALU
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR PELAYANAN PAJAK PRATAMA PALU
LOKASI : KOTA PALU
TAHUN ANGGARAN : 2021

No Kode Type URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
ANALISA Pekerjaan
a b c d e f g h=fxg
5 Non Standar Pek. Partisi 6 Bilik (PR1) + Aksesoris Set 1.00
6 Non Standar Pek. Partisi (PR8) + Aksesoris Set 1.00
7 Standar Pek. Ventilasi (V1) + Aksesoris Set 5.00
JUMLAH PEKERJAAN PINTU, JENDELA DAN VENTILASI
RENCANA ANGGARAN BIAYA
SATUAN KERJA : KANTOR PELAYANAN PAJAK PRATAMA PALU
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR PELAYANAN PAJAK PRATAMA PALU
LOKASI : KOTA PALU
TAHUN ANGGARAN : 2021

No Kode Type URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
ANALISA Pekerjaan
a b c d e f g h=fxg
IV.6 PEKERJAAN ATAP DAN LANGIT-LANGIT
A PEKERJAAN LANGIT-LANGIT
Pek. Langit-Langit Gypsum + Rangka Hollow (Finishing Tepi Shadow
1 Standar Line) M2 512.29

2 Standar Pek. Langit-Langit GRC + Rangka Hollow M2 67.11


3 Standar Pek. Manhole Bh 10.00
B PEKERJAAN ATAP
1 Non Standar Pek. Atap Bitumen + Rangka Baja Ringan 75.75 (Onduline Tile) M2 387.21
2 Non Standar Pek. Lisplank GRC M' 28.32
3 Non Standar Pek. Atap Pergola Entrance Set 1.00
4 Standar Pek. Screed M2 192.47
5 Non Standar Pek. Waterproofing Fibreglass M2 192.47
JUMLAH PEKERJAAN ATAP DAN LANGIT-LANGIT
IV.7 PEKERJAAN PENGECATAN
1 Standar Pek. Cat Dinding M2 1172.74
2 Standar Pek. Cat Batu Alam Dan Plester Ciprat M2 135.26
3 Standar Pek. Cat Langit-Langit M2 585.06
JUMLAH PEKERJAAN PENGECATAN
TOTAL BIAYA DIVISI 4 - PEKERJAAN ARSITEKTUR
DIVISI 2 - SITE WORK
V SEGMEN GEDUNG STAF (SGS)
PEKERJAAN TANAH SGS
A Pekerjaan Tanah Area Poer Plat Dan Pondasi Batu Kali
1 Standar Pek. Galian Tanah M3 554.70
2 Standar Pek. Buangan Bekas Galian (Di Gunakan Sebagai Timbunan) M3 466.57
3 Standar Pek. Urugan Kembali Bekas Galian M3 88.13
4 Standar Pek. Urugan Pasir M3 17.15
B Pekerjaan Peninggian Lantai
1 Standar Pek. Timbunan Sirtu M3 1093.44
2 Standar Pek. Pemadatan Tanah M3 36.76
3 Standar Pek. Urugan Pasir M3 36.76
4 Standar Pek. Tanah Subur M3 72.59
JUMLAH PEKERJAAN TANAH SGS
TOTAL BIAYA DIVISI 2 - SITE WORK
DIVISI 3 - PEKERJAAN STRUKTUR
VI PEKERJAAN STRUKTURAL SGS
VI.1 PEKERJAAN STRUKTUR ATAS
A Pekerjaan Cor Rabat Lantai
1 Standar Pek. Lantai Kerja M3 47.70
2 Standar Pek. Beton K250 M3 88.20
3 Standar Pek. Pembesian Kg 3387.11
B Pekerjaan Kolom 30x40
1 Standar Pek. Beton K250 M3 26.39
2 Standar Pek. Pembesian Kg 5890.76
3 Standar Pek. Bekisting M2 307.56
C Pekerjaan Kolom 15x30
1 Standar Pek. Beton K250 M3 2.13
2 Standar Pek. Pembesian Kg 388.22
3 Standar Pek. Bekisting M2 42.66
D Pekerjaan Kolom Praktis Dan Balok Praktis
1 Standar Pek. Kolom (Termasuk Bekisting Dan Pembesian) M' 120.89
2 Standar Pek. Balok (Termasuk Bekisting Dan Pembesian) M' 246.22
E Pekerjaan Meja Beton
1 Standar Pek. Beton K100 M3 0.04
2 Standar Pek. Pembesian Kg 11.04
3 Standar Pek. Bekisting M2 0.54
RENCANA ANGGARAN BIAYA
SATUAN KERJA : KANTOR PELAYANAN PAJAK PRATAMA PALU
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR PELAYANAN PAJAK PRATAMA PALU
LOKASI : KOTA PALU
TAHUN ANGGARAN : 2021

No Kode Type URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
ANALISA Pekerjaan
a b c d e f g h=fxg
F Pekerjaan Balok 25x50
1 Standar Pek. Beton K250 M3 26.03
2 Standar Pek. Pembesian Kg 3601.25
3 Standar Pek. Bekisting M2 251.52
G Pekerjaan Balok 20x40
1 Standar Pek. Beton K250 M3 4.46
2 Standar Pek. Pembesian Kg 679.07
3 Standar Pek. Bekisting M2 55.80
H Pekerjaan Plat Dak
1 Standar Pek. Beton K250 M3 7.91
2 Standar Pek. Pembesian Kg 746.86
3 Standar Pek. Bekisting M2 79.14
I Pekerjaan Struktur Atap Baja
1 Non Standar Pek. Rangka Baja BJ 37 Uk. 100x200x5,5x8 Kg 5130.50
2 Non Standar Pek. Balok CNP 150x50x20x3,2 Kg 588.02
3 Non Standar Pek. Rangka Baja BJ 37 Uk. 125x250x6x9 Kg 3534.24
4 Non Standar Pek. Balok CNP 125x50x20x2,3 Kg 743.44
5 Non Standar Pek. Gording CNP 100x50x20x2,3 Kg 8251.25
6 Non Standar Pek. Angkur Baut Ø 16 HTB ST60 Bh 168.00
7 Non Standar Pek. Base Plate BJ 37 Uk. 300X200X10 Kg 56.52
8 Non Standar Pek. Base Plate BJ 37 Uk. 175X300X10 Kg 98.91
9 Non Standar Pek. Sirip Baja 8 mm Kg 211.01
JUMLAH PEKERJAAN STRUKTUR ATAS
VI.2 PEKERJAAN STRUKTUR BAWAH SGS
A Pekerjaan Poerplat
1 Standar Pek. Lantai Kerja M3 9.44
2 Standar Pek. Beton M3 46.80
3 Standar Pek. Pembesian Kg 5242.32
4 Standar Pek. Bekisting M2 93.60
B Pekerjaan Pondasi Batu
1 Standar Pek. Pasangan Batu Kosong M3 30.23
2 Standar Pek. Pondasi Batu M3 149.23
C Pekerjaan Tie Beam 20/40
1 Standar Pek. Lantai Kerja M3 2.69
2 Standar Pek. Beton M3 23.38
3 Standar Pek. Pembesian Kg 3032.69
4 Standar Pek. Bekisting M2 233.51
D Pekerjaan Kolom Pedestal 30x40
1 Standar Pek. Beton K250 M3 14.74
2 Standar Pek. Pembesian Kg 3479.98
3 Standar Pek. Bekisting M2 171.99
E Pekerjaan Pondasi Tiang (dalam 7 m)
1 Standar Pengadaan tiang pancang Dia.30 spun pile runcing (panjang 7 m) Btg 70.00
2 Standar Biaya pemancangan (Hammer Diesel) + alat erection M' 490.00
Include alat erection, Mobilisasi alat, bahan bakar, & operator
3 Standar Biaya Pemotongan Kepala Tiang Pancang Btg 70.00
JUMLAH PEKERJAAN STRUKTUR BAWAH SGS
TOTAL BIAYA DIVISI 3 - PEKERJAAN STRUKTUR
DIVISI 4 - PEKERJAAN ARSITEKTUR
VII PEKERJAAN ARSITEKTURAL SGS
VII.1 PEKERJAAN FINISHING DINDING
Standar Pek. Pasangan Dinding 1/2 Bata, Camp. 1 Pc : 5 Ps M2 912.22
Standar Pek. Plesteran Dinding, Campuran 1 Pc : 5 Ps, tebal 15 mm M2 1824.44
Standar Pek. Acian Dinding M2 1594.21
Standar Pek. Dinding Homogenus Tile 30 X 60 cm Area KM/WC (Full Dinding) M2 35.90
JUMLAH PEKERJAAN FINISHING DINDING
RENCANA ANGGARAN BIAYA
SATUAN KERJA : KANTOR PELAYANAN PAJAK PRATAMA PALU
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR PELAYANAN PAJAK PRATAMA PALU
LOKASI : KOTA PALU
TAHUN ANGGARAN : 2021

No Kode Type URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
ANALISA Pekerjaan
a b c d e f g h=fxg
VII.2 PEKERJAAN FASADE
Pek. Aluminium Composite Panel Grey Colour PVDF + Rangka Besi
1 Non Standar M2 294.10
Hollow
2 Non Standar Pek. Dinding Area Atap GRC + Rangka Besi Hollow Set 99.08
3 Non Standar Pek. ACP Cutting + Rangka Besi Hollow Set 93.16
4 Non Standar Pek. Curtain Wall (CW4) Kaca Stopsol Tempered Uk. 5mm Set 1.00
5 Non Standar Pek. Pilar Kolom Eksterior (GRC) M' 3.00
6 Standar Pek. Batu Alam M2 182.92
7 Standar Pek. Plester Ciprat Area Taman M2 11.41
8 Standar Pek. Papan Nama Gedung (Acrylic) M2 5.50
JUMLAH PEKERJAAN FASADE
VII.3 PEKERJAAN INTERIOR GEDUNG
1 Non Standar Pek. Cover Column ( ACP Type PE) M2 48.24
2 Non Standar Pek. Wallpaper Area Pimpinan M2 187.95
3 Non Standar Pek. Partisi Ruang Vicon (Stell Cutting) M2 7.83
4 Standar Pek. Partisi Gypsum Double (R. Perpustakaan & R. Panel) M2 16.70
5 Non Standar Pek. Dudukan Lampu LED Strip (Material Acrylic) sesuai design gambar Bh 6.00
Interior B16
JUMLAH PEKERJAAN INTERIOR GEDUNG
VII.4 PEKERJAAN FINISHING LANTAI
1 Standar Pek. Step Nozing Area Tangga M' 104.31
2 Standar Pek. Tegel Homogenus Tile Type Polished Ukuran 60 X 60 cm M2 601.99
3 Standar Pek. Tegel Homogenus Tile Type Unpolished Uk. 60 X 60 cm M2 136.63
4 Non Standar Pek. Lantai Parquet (Include List Lantai) M2 35.69
5 Non Standar Pek. Karpet Tile merk forbo (Rg. Pimpinan & Perpustakaan) M2 87.65
6 Non Standar Pek. Raised Floor M2 232.56
7 Standar Pek. Plint Homogenus Tile 10x60 M' 228.88
8 Standar Pek. Tegel Batu Sikat Area Ramp M2 7.88
Pek. Homogenus tile Type Polished Ukuran 60 X 60 cm (Meja
9 Standar Wastafel) M2 0.54
10 Standar Pek. Lantai Batu Alam (Tipe Andesit) M2 112.91
JUMLAH PEKERJAAN FINISHING LANTAI
VII.5 PEKERJAAN PINTU, JENDELA DAN VENTILASI
1 Non Standar Pek. Pintu Dan Jendela (PJ3) + Aksesoris Set 3.00
2 Non Standar Pek. Pintu Dan Jendela (PJ4) + Aksesoris Set 1.00
1 Non Standar Pek. Pintu Dan Jendela (PJ6) + Aksesoris Set 2.00
2 Non Standar Pek. Pintu Dan Jendela (PJ7) + Aksesoris Set 2.00
3 Non Standar Pek. Pintu (P1) + Aksesoris Set 3.00
4 Non Standar Pek. Pintu (P3) + Aksesoris Set 4.00
5 Non Standar Pek. Partisi 4 Bilik (PR2) + Aksesoris Set 1.00
6 Non Standar Pek. Partisi (PR3) + Aksesoris Set 1.00
7 Non Standar Pek. Partisi 4 Bilik (PR4) + Aksesoris Set 1.00
1 Non Standar Pek. Partisi (PR5) + Aksesoris Set 1.00
2 Non Standar Pek. Partisi (PR6) + Aksesoris Set 1.00
3 Non Standar Pek. Partisi 3 Bilik (PR7) + Aksesoris Set 1.00
4 Non Standar Pek. Jendela (J1) + Aksesoris Set 11.00
5 Non Standar Pek. Jendela (J2) + Aksesoris Set 5.00
6 Standar Pek. Ventilasi (V1) + Aksesoris Set 4.00
Pek. Kunci Finger Print + Instlasi dan Sistem (Terpasang pada P3 Pintu
7 Non Standar Set 1.00
Masuk SGS) Merk ZKT eco F18
JUMLAH PEKERJAAN PINTU, JENDELA DAN VENTILASI
RENCANA ANGGARAN BIAYA
SATUAN KERJA : KANTOR PELAYANAN PAJAK PRATAMA PALU
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR PELAYANAN PAJAK PRATAMA PALU
LOKASI : KOTA PALU
TAHUN ANGGARAN : 2021

No Kode Type URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
ANALISA Pekerjaan
a b c d e f g h=fxg
VII.6 PEKERJAAN ATAP DAN LANGIT-LANGIT
A PEKERJAAN LANGIT-LANGIT
Pek. Langit-Langit Gypsum + Rangka Hollow (Finishing Tepi Shadow
1 Standar Line) M2 1008.34

2 Standar Pek. Langit-Langit GRC + Rangka Hollow M2 213.79


3 Standar Pek. Manhole Bh 10.00
B PEKERJAAN ATAP
1 Non Standar Pek. Atap Bitumen + Rangka Baja Ringan 75.75 (Onduline Tile) + Nok M2 1131.00
2 Standar Pek. Lisplank GRC M' 114.84
3 Non Standar Pek. Atap Kanopi Membran M2 65.49
4 Standar Pek. Screed M2 101.18
5 Non Standar Pek. Waterproofing Fibreglass M2 101.18
6 Non Standar Pek. Nok Atap Bitumen M' 31.60
JUMLAH PEKERJAAN ATAP DAN LANGIT-LANGIT
VII.7 PEKERJAAN PENGECATAN
1 Standar Pek. Cat Dinding M2 1594.21
2 Standar Pek. Cat Batu Alam M2 182.92
3 Standar Pek. Cat Langit-Langit M2 1245.10
JUMLAH PEKERJAAN PENGECATAN
TOTAL BIAYA DIVISI 4 - PEKERJAAN ARSITEKTUR
DIVISI 2 - SITE WORK
VIII SEGMEN GEDUNG STAF (SGA)
VIII.1 PEKERJAAN TANAH SGA
A Pekerjaan Tanah Area Poerplat Dan Pondasi Batu Kali
1 Standar Pek. Galian Tanah M3 278.00
2 Standar Pek. Buangan Bekas Galian (Di Gunakan Sebagai Timbunan) M3 230.11
3 Standar Pek. Urugan Kembali Bekas Galian M3 47.89
4 Standar Pek. Urugan Pasir M3 8.91
B Pekerjaan Peninggian Lantai
1 Standar Pek. Timbunan Sirtu M3 250.67
2 Standar Pek. Pemadatan Tanah M3 30.71
3 Standar Pek. Urugan Pasir M3 30.71
4 Standar Pek. Tanah Subur M3 56.40
JUMLAH PEKERJAAN TANAH SGA
TOTAL BIAYA DIVISI 2 - SITE WORK
DIVISI 3 - PEKERJAAN STRUKTUR
IX PEKERJAAN STRUKTURAL SGA
IX.1 PEKERJAAN STRUKTUR ATAS
A Pekerjaan Cor Rabat Lantai
1 Standar Pek. Lantai Kerja M3 30.78
2 Standar Pek. Beton K250 M3 59.25
3 Standar Pek. Pembesian Kg 2418.62
B Pekerjaan Kolom 30x60
1 Standar Pek. Beton K250 M3 1.94
2 Standar Pek. Pembesian Kg 399.71
3 Standar Pek. Bekisting M2 19.44
C Pekerjaan Kolom 30x40
1 Standar Pek. Beton K250 M3 13.61
2 Standar Pek. Pembesian Kg 3060.86
3 Standar Pek. Bekisting M2 158.76
D Pekerjaan Kolom 15x30
1 Standar Pek. Beton K250 M3 0.81
2 Standar Pek. Pembesian Kg 156.05
3 Standar Pek. Bekisting M2 16.20
E Pekerjaan Kolom Praktis Dan Balok Praktis
RENCANA ANGGARAN BIAYA
SATUAN KERJA : KANTOR PELAYANAN PAJAK PRATAMA PALU
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR PELAYANAN PAJAK PRATAMA PALU
LOKASI : KOTA PALU
TAHUN ANGGARAN : 2021

No Kode Type URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
ANALISA Pekerjaan
a b c d e f g h=fxg
1 Standar Pek. Kolom (Termasuk Bekisting Dan Pembesian) M' 225.33
2 Standar Pek. Balok (Termasuk Bekisting Dan Pembesian) M' 217.78
RENCANA ANGGARAN BIAYA
SATUAN KERJA : KANTOR PELAYANAN PAJAK PRATAMA PALU
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR PELAYANAN PAJAK PRATAMA PALU
LOKASI : KOTA PALU
TAHUN ANGGARAN : 2021

No Kode Type URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
ANALISA Pekerjaan
a b c d e f g h=fxg
F Pekerjaan Meja Beton
1 Standar Pek. Beton K100 M3 0.53
2 Standar Pek. Pembesian Kg 11.04
3 Standar Pek. Bekisting M2 4.35
G Pekerjaan Balok 30x60
1 Standar Pek. Beton K250 M3 1.96
2 Standar Pek. Pembesian Kg 145.40
3 Standar Pek. Bekisting M2 12.33
H Pekerjaan Balok 25x50
1 Standar Pek. Beton K250 M3 19.68
2 Standar Pek. Pembesian Kg 2779.10
3 Standar Pek. Bekisting M2 165.73
I Pekerjaan Balok 20x40
1 Standar Pek. Beton K250 M3 2.84
2 Standar Pek. Pembesian Kg 454.58
3 Standar Pek. Bekisting M2 27.90
J Pekerjaan Balok 20x30
1 Standar Pek. Beton K250 M3 7.05
2 Standar Pek. Pembesian Kg 1053.89
3 Standar Pek. Bekisting M2 78.88
K Pekerjaan Plat Dak
1 Standar Pek. Beton K250 M3 26.41
2 Standar Pek. Pembesian Kg 3190.13
3 Standar Pek. Bekisting M2 260.53
L Pekerjaan Struktur Atap Baja
1 Non Standar Pek. Rangka Baja BJ 37 Uk. 125x250x6x9 Kg 5046.80
2 Non Standar Pek. Balok CNP 125 Kg 509.48
3 Non Standar Pek. Gording CNP 100x50x20x2,3 Kg 2808.40
4 Non Standar Pek. Angkur Baut Ø 16 HTB ST60 Bh 176.00
3 Non Standar Pek. Base Plate BJ 37 Uk. 175X300X10 Kg 90.67
JUMLAH PEKERJAAN STRUKTUR ATAS
IX.2 PEKERJAAN STRUKTUR BAWAH SGA
A Pekerjaan Poerplat
1 Standar Pek. Lantai Kerja M3 5.49
2 Standar Pek. Beton M3 27.30
3 Standar Pek. Pembesian Kg 3050.02
4 Standar Pek. Bekisting M2 53.70
B Pekerjaan Pondasi Batu
1 Standar Pek. Pasangan Batu Kosong M3 13.31
2 Standar Pek. Pondasi Batu M3 37.68
C Pekerjaan Tie Beam 20/40
1 Standar Pek. Lantai Kerja M3 1.02
2 Standar Pek. Beton M3 14.03
3 Standar Pek. Pembesian Kg 1826.64
4 Standar Pek. Bekisting M2 139.46
D Pekerjaan Kolom Pedestal 30x60
1 Standar Pek. Beton K250 M3 0.77
2 Standar Pek. Pembesian Kg 170.50
3 Standar Pek. Bekisting M2 7.74
E Pekerjaan Kolom Pedestal 30x40
1 Standar Pek. Beton K250 M3 5.42
2 Standar Pek. Pembesian Kg 1406.03
3 Standar Pek. Bekisting M2 63.21
E Pekerjaan Pondasi Tiang (dalam 7 m)
1 Standar Pengadaan tiang pancang Dia.30 spun pile runcing (panjang 7 m) Btg 44.00
2 Standar Biaya pemancangan (Hammer Diesel) + alat erection M' 308.00
RENCANA ANGGARAN BIAYA
SATUAN KERJA : KANTOR PELAYANAN PAJAK PRATAMA PALU
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR PELAYANAN PAJAK PRATAMA PALU
LOKASI : KOTA PALU
TAHUN ANGGARAN : 2021

No Kode Type URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
ANALISA Pekerjaan
a b c d e f g h=fxg
Include Alat Erection,Mobilisasi alat, bahan bakar & operator
3 Standar Biaya Pemotongan Kepala Tiang Pancang Btg 44.00
JUMLAH PEKERJAAN STRUKTUR BAWAH SGA
TOTAL BIAYA DIVISI 3 - PEKERJAAN STRUKTUR
RENCANA ANGGARAN BIAYA
SATUAN KERJA : KANTOR PELAYANAN PAJAK PRATAMA PALU
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR PELAYANAN PAJAK PRATAMA PALU
LOKASI : KOTA PALU
TAHUN ANGGARAN : 2021

No Kode Type URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
ANALISA Pekerjaan
a b c d e f g h=fxg
DIVISI 4 - PEKERJAAN ARSITEKTUR
X PEKERJAAN ARSITEKTURAL SGA
X.1 PEKERJAAN FINISHING DINDING
1 Standar Pek. Pasangan Dinding 1/2 Bata, Camp. 1 Pc : 5 Ps M2 800.62
2 Standar Pek. Pasangan Dinding bata ringan 200x600x75 + MU 380 M2 91.04
3 Standar Pek. Plesteran Bata Ringan (MU 301) M2 182.08
2 Standar Pek. Plesteran Dinding, Campuran 1 Pc : 5 Ps, tebal 15 mm M2 1601.24
3 Standar Pek. Acian Dinding M2 1560.39
4 Standar Pek. Dinding Homogenus Ukuran 30 X 60 cm Area KM/WC (Full Dinding) M2 160.20
JUMLAH PEKERJAAN FINISHING DINDING
X.2 PEKERJAAN FASADE
1 Non Standar Pek. Aluminium Composite Panel Grey Colour PVDF + Rangka Besi M2 315.41
Hollow
2 Non Standar Pek. Curtain Wall (CW5) Kaca Stopsol Tempered Uk. 5mm Set 1.00
3 Non Standar Pek. Curtain Wall (CW6) Kaca Stopsol Tempered Uk. 5mm Set 1.00
4 Standar Pek. Kamuflase Watertank Pas. Besi Hollow Kombinasi ACP (Sesuaii Set 1.00
Gambar)
5 Standar Pek. Batu Alam M2 62.73
6 Non Standar Pek. Ventilasi Kaca Acrylic Kuning + Rangka Alluminium Unit 8.00
7 Standar Pek. Papan Nama Gedung M2 2.85
JUMLAH PEKERJAAN FASADE
X.3 PEKERJAAN INTERIOR GEDUNG
1 Non Standar Pek. Folding Door + Rel & Dudukan Set 1.00
2 Non Standar Pek. Partisi Mushola, Atas Pintu R. Server & R.Inspirasi (Gypsum) M2 98.24
3 Non Standar Pek. Dinding Akustik Rg. Inspirasi (HPL, List Aluminium, Rockwool Dan M2 62.10
Rangka Baja Ringan)
4 Non Standar Pek. Backdrop Aula + Panggung Set 1.00
Spesifikasi
Bacakdrop tripleks 18 mm lapis HPL
Panggung Rangka Kayu (lantai multipleks 18mm)
Finishing panggung karpet tile merk Forbo
5 Non Standar Pek. Partisi Interior kamar Mandi (Cubicle) M2 44.56
JUMLAH PEKERJAAN INTERIOR GEDUNG
X.4 PEKERJAAN FINISHING LANTAI
1 Standar Pek. Step Nozing Area Tangga M' 61.45
2 Standar Pek. Tegel Homegenus Tile Type Polished Ukuran 60 X 60 cm M2 499.43
3 Standar Pek. Tegel Homogenus Tile Type Unpolished Ukuran 60 X 60 cm M2 92.66
4 Standar Pek. Plint Homogenus Tile 10x60 M' 205.41
5 Non Standar Pek. Karpet Tile merk forbo Ruang Inspirasi M2 15.19
6 Standar Pek. Lantai Batu Sikat Area Ramp M2 8.65
Pek. Homogenus Tile Type Polished Ukuran 60 X 60 cm (Meja
7 Standar Wastafel) M2 4.35
JUMLAH PEKERJAAN FINISHING LANTAI
X.5 PEKERJAAN PINTU, JENDELA DAN VENTILASI
1 Non Standar Pek. Pintu Dan Jendela (PJ2) + Aksesoris Set 1.00
2 Non Standar Pek. Pintu Dan Jendela (PJ3) + Aksesoris Set 1.00
3 Non Standar Pek. Pintu Dan Jendela (PJ4) + Aksesoris Set 1.00
4 Non Standar Pek. Pintu Dan Jendela (PJ5) + Aksesoris Set 1.00
5 Non Standar Pek. Pintu (P3) + Aksesoris Set 6.00
6 Non Standar Pek. Pintu (P4) + Aksesoris Set 4.00
7 Non Standar Pek. Partisi (PR9) + Aksesoris Set 1.00
8 Non Standar Pek. Jendela (J2) + Aksesoris Set 4.00
9 Standar Pek. Ventilasi (V1) + Aksesoris Set 9.00
Pek. Kunci Finger Print + Instlasi dan Sistem (Terpasang pada PJ4 Pintu
10 Non Standar Keluar SGA) merk ZKT eco F18 Set 1.00
JUMLAH PEKERJAAN PINTU, JENDELA DAN VENTILASI
RENCANA ANGGARAN BIAYA
SATUAN KERJA : KANTOR PELAYANAN PAJAK PRATAMA PALU
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR PELAYANAN PAJAK PRATAMA PALU
LOKASI : KOTA PALU
TAHUN ANGGARAN : 2021

No Kode Type URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
ANALISA Pekerjaan
a b c d e f g h=fxg
X.6 PEKERJAAN ATAP DAN LANGIT-LANGIT
A PEKERJAAN LANGIT-LANGIT
Pek. Langit-Langit Gypsum + Rangka Hollow (Finishing Tepi Shadow
1 Standar Line) M2 568.29

2 Standar Pek. Langit-Langit GRC + Rangka Hollow M2 94.55


3 Standar Pek. Manhole Bh 10.00
B ATAP
1 Non Standar Pek. Atap Bitumen + Rangka Baja Ringan 75.75 (Onduline Tile) M2 376.36
2 Non Standar Pek. Lisplank GRC M' 28.40
2 Non Standar Pek. Atap Kanopi Ke Ruang Arsip Belakang Set 1.00
3 Non Standar Pek. Atap Kanopi Membran M2 22.12
4 Standar Pek. Screed M2 308.87
5 Non Standar Pek. Waterproofing Fibreglass M2 308.87
JUMLAH PEKERJAAN ATAP DAN LANGIT-LANGIT
X.7 PEKERJAAN PENGECATAN
1 Standar Pek. Cat Dinding M2 1560.39
2 Standar Pek. Cat Batu Alam M2 62.73
3 Standar Pek. Cat Langit-Langit M2 668.52
JUMLAH PEKERJAAN PENGECATAN
TOTAL BIAYA DIVISI 4 - PEKERJAAN ARSITEKTUR
RENCANA ANGGARAN BIAYA
SATUAN KERJA : KANTOR PELAYANAN PAJAK PRATAMA PALU
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR PELAYANAN PAJAK PRATAMA PALU
LOKASI : KOTA PALU
TAHUN ANGGARAN : 2021

No Kode Type URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
ANALISA Pekerjaan
a b c d e f g h=fxg
DIVISI 5 - PEKERJAAN MEKANIKAL
XI PEKERJAAN MEKANIKAL
XI.1 PEKERJAAN SANITAIR
1 Standar Kloset Duduk (Toto Type CW 660 NJ) Unit 17.00
2 Standar Kloset Duduk (Rg. Kepala Kantor) Toto Type C436N Unit 1.00
3 Standar Tissue Holder (Toto TX720CRB) Unit 18.00
4 Standar Jet Washer Toilet (Toto Tipe THX20NB) Unit 18.00
5 Standar Wastafel Type Meja (Toto Type LW642CJ) Unit 13.00
6 Standar Wastafel Type Gantung (Toto Tipe LW211CJ) Unit 1.00
7 Standar Kitchen Zinc Stanless (Royal/Modena) Unit 1.00
8 Standar Liquid Soap Dispenser (Toto Tipe TS125R) Unit 18.00
9 Standar Cermin (Amstad atau setara) Unit 14.00
10 Standar Kran Air Wastafel (Type TX109LRS) Unit 14.00
11 Standar Kran Air Kitchen Zink (Toto Type TX109LEM) Unit 1.00
12 Standar Kran Air Wudhu (TOTO Type TX130L) Unit 2.00
13 Standar Floor Drain (Toto TX1EB) Unit 27.00
14 Standar Shower Set (Tipe TX492SE) Unit 3.00
15 Standar Towel Bar Stanless (Toto/Amstad) Unit 18.00
16 Standar Grab Bar Stanlees Set 1.00
17 Standar Urinoir (Type U57 M) Muslim Unit 5.00
JUMLAH PEKERJAAN SANITAIR
XI.2 PEKERJAAN SUMBER AIR BERSIH DAN PERPOMPAAN
A Pek. Sumber Air Bersih
1 Non Standar Pek. Sumur Dalam Unit 1.00
2 Standar Pengadaan dan pemasangan Pompa Sumur Dalam
3 Standar Type : Submersible Pump
4 Standar Daya : 3 HP
5 Standar Lengkap Dengan Screen, proteksi, instalasi kabel daya/pemipaan (casing), dll
6 Standar Kabel jenis waterproof, lengkap Panel Kontrol, dll
7 Standar Pemipaan sampai ke Ground Water Tank (GWT)
8 Standar Peralatan penunjang, Gate Valve, Check Valve, Meter air, Bak Kontrol, dan accessories lainnya.
9 Standar Pengeboran dalam sampai mendapatkan Kapasitas air Min. 2liter/Detik (Jernih)
10 Standar Pekerjaan harus mengikuti/memenuhi Standard DepKes-RI
B Pek. Mesin Pompa Transfer
1 Non Standar Pompa Transfer (Centrifugal End Suction Type) Unit 1.00
2 Kapasitas 200LPM
3 Head 56m
4 Non Standar Header Pipa GIP 4" + Coating M' 4.00
5 Non Standar Gate Valve Bronze dia 32 mm Bh 2.00
6 Non Standar Gate Valve dia 65 mm 10K Bh 3.00
7 Non Standar Flexible Joint dia 65 mm 10K Bh 2.00
8 Non Standar Check Valve dia 65 mm 10K Unit 1.00
9 Non Standar Strainer dia 65 mm 10K Unit 1.00
9 Non Standar Pressure Gauge Bh 1.00
10 Non Standar PP-Pompa Transfer Unit 1.00
11 Non Standar Instalasi Daya Pompa Transfer NYY 4x4 mm2 M' 40.00
C Pek. Mesin Pompa Kuras
1 Non Standar Pompa Kuras (Submersible Type) Unit 1.00
2 Non Standar Gate Valve Bronze dia 25 mm Bh 1.00
3 Non Standar Check Valve Bronze dia 25 mm Bh 1.00
4 Non Standar Instalasi Daya Pompa Kuras NYM 3x2,5 mm2 M' 20.00
D Pek. Pemipaan Utama
1 Non Standar Pipa PVC Type AW Diameter 1 1/2" (Dari Sumber Air Ke GWT) M' 15.00
2 Non Standar Pipa PVC Type AW Diameter 3/4" (Pompa Kuras) M' 15.00
3 Non Standar Pipa PPR PN 10 Diameter 63mm (Dari GWT Ke Tandon) M' 50.00
4 Fitting Pipa PVC Type AW Set 1.00
RENCANA ANGGARAN BIAYA
SATUAN KERJA : KANTOR PELAYANAN PAJAK PRATAMA PALU
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR PELAYANAN PAJAK PRATAMA PALU
LOKASI : KOTA PALU
TAHUN ANGGARAN : 2021

No Kode Type URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
ANALISA Pekerjaan
a b c d e f g h=fxg
5 Fitting Pipa PPR Type PN 10 Set 1.00
5 Civil Work (Galian, Menimbun Kembali, Bobokan Dinding) Paket 1.00
RENCANA ANGGARAN BIAYA
SATUAN KERJA : KANTOR PELAYANAN PAJAK PRATAMA PALU
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR PELAYANAN PAJAK PRATAMA PALU
LOKASI : KOTA PALU
TAHUN ANGGARAN : 2021

No Kode Type URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
ANALISA Pekerjaan
a b c d e f g h=fxg
E Pek. Mesin Pompa Distribusi
1 Non Standar Mesin Pompa Distribusi Kap. 50 Lpm Head 20m (Packaged Booster Pum Unit 1.00
2 Non Standar Header Pipa GIP 4" + Coating M' 8.00
3 Non Standar Gate Valve dia 65 mm 10K Bh 5.00
4 Non Standar Check Valve dia 65 mm 10K Unit 1.00
5 Non Standar Gate Valve Bronze dia 25 mm Bh 6.00
6 Non Standar Pressure Switch Bh 1.00
7 Non Standar Pressure Gauge Bh 1.00
8 Non Standar Strainer dia 65 mm 10K Unit 1.00
9 Non Standar Flexible Joint dia 65 mm 10K Bh 2.00
10 Non Standar Water Level Control Bh 2.00
11 Non Standar PP-Pompa Distribusi Unit 1.00
12 Non Standar Instalasi Daya Pompa Distribusi NYY 4x2,5 mm2 M' 50.00
13 Civil Work (Galian, Menimbun Kembali, Bobokan Dinding ) Paket 1.00
A Pek. Pemasangan Water Tank
14 Water Tank Stainless Steel Kapasitas 1500 L + Dudukan Unit 2.00
JUMLAH PEKERJAAN SUMBER AIR BERSIH DAN PERPOMPAAN
XI.3 PEKERJAAN INSTALASI AIR BERSIH
1 Non Standar Pipa PPR PN 10 Diameter 32mm M' 204.00
2 Non Standar Pipa PPR PN 10 Diameter 25mm M' 148.18
3 Non Standar Pipa PPR PN 10 Diameter 20mm M' 20.70
4 Non Standar Staight Valve Diameter 32mm Bh 8.00
5 Fitting Pipa PPR Type PN 10 Set 1.00
6 Civil Work (Galian, Menimbun Kembali, Bobokan Dinding) Paket 1.00
JUMLAH PEKERJAAN INSTALASI AIR BERSIH
XI.4 PEKERJAAN INSTALASI AIR BEKAS (GREY WATER)
1 Non Standar Pipa PVC Type AW Diameter 3" (Pipa Cabang) M' 79.67
2 Non Standar Pipa PVC Type AW Diameter 4" (Pipa Utama) M' 32.50
3 Non Standar Clean Out 4" Bh 3.00
4 Fitting Pipa PVC Type AW Set 1.00
5 Civil Work (Galian, Menimbun Kembali, Bobokan Dinding) Paket 1.00
JUMLAH PEKERJAAN INSTALASI AIR BEKAS (GREY WATER)
XI.5 PEKERJAAN INSTALASI AIR KOTOR-KLOSET (BLACK WATER)
1 Non Standar Pipa PVC Type AW Diameter 6" (Pipa Utama) M' 84.66
2 Non Standar Pipa PVC Type AW Diameter 4" (Pipa Cabang) M' 31.25
3 Non Standar Clean Out 6" Bh 5.00
4 Fitting Pipa PVC Type AW Set 1.00
5 Civil Work (Galian, Menimbun Kembali, Bobokan Dinding) Paket 1.00
JUMLAH PEKERJAAN INSTALASI AIR KOTOR-KLOSET (BLACK WATER)
XI.6 PEKERJAAN INSTALASI PENGOLAHAN AIR LIMBAH - SEPTIKTANK
1 Non Standar Pek. BioSeptiktank Kapasitas 20 m3 (Terbagi 4 titik X 5 M3) Set 1.00
2 Standar Pipa PVC Type AW Diameter 4" (Outlet Ke Saluran) M' 25.00
3 Standar Civil Work (Galian Dan Menimbun Kembali) Paket 1.00
JUMLAH PEKERJAAN INSTALASI PENGOLAHAN AIR LIMBAH - SEPTIKTANK
IV.1 PEKERJAAN INSTALASI AIR HUJAN
1 Standar Pipa PVC Type AW Diameter 3" M' 10.50
2 Standar Pipa PVC Type AW Diameter 4" M' 288.60
3 Standar Roof Drain Unit 35.00
4 Standar Grouting Lubang Roof Drain Titik 35.00
5 Standar Fitting Pipa PVC Type AW Set 1.00
JUMLAH PEKERJAAN INSTALASI AIR HUJAN
RENCANA ANGGARAN BIAYA
SATUAN KERJA : KANTOR PELAYANAN PAJAK PRATAMA PALU
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR PELAYANAN PAJAK PRATAMA PALU
LOKASI : KOTA PALU
TAHUN ANGGARAN : 2021

No Kode Type URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
ANALISA Pekerjaan
a b c d e f g h=fxg
IV.1 PEKERJAAN SISTEM TATA UDARA
Harga Pengadaan Sistem Tata Udara
1 Non Standar Out Door ; VRV-IV S kap : 38.200 BTU (Model RXMQ 4 AVE4) Unit 1.00
2 Non Standar Out Door ; VRV - A kap : 341.000 BTU (Model RXQ 36 AMY14) Unit 1.00
3 Non Standar Out Door ; VRV-IV S kap : 382.000 BTU (Model RXQ 30 AMY14) Unit 1.00
4 Non Standar Indoor AC type cassette kap : 47.800 Btu/h Unit 9.00
5 Non Standar Indoor AC type cassette kap : 38.200 Btu/h Unit 2.00
6 Non Standar Indoor AC type cassette kap : 30.700 Btu/h Unit 1.00
7 Non Standar Indoor AC type cassette kap : 24.200 Btu/h Unit 1.00
8 Non Standar Indoor AC type cassette kap : 12.300 Btu/h Unit 1.00
9 Non Standar Indoor AC type wall mounted kap : 15.400 Btu/h Unit 3.00
10 Non Standar Indoor AC type wall mounted kap : 9.600 Btu/h Unit 1.00
11 Non Standar Indoor AC type wall mounted kap : 7.500 Btu/h Unit 22.00
12 Non Standar Refnet Joint Bh 36.00
13 Non Standar Common Navigation Controller Bh 39.00
14 Non Standar OU Connection Kit Unit 1.00
15 Non Standar Pipe Size Reducer Bh 4.00
Pekerjaan Instalasi Mekanikal (Include Material)
16 Non Standar Pemasangan Unit dan Sistem AC Daikin VRV Set 1.00
17 Non Standar Pemasangan Refrigerant Copper Pipe Set 1.00
18 Non Standar Refrigerant Copper Piping Accessories Set 1.00
19 Non Standar Drain Pipe (Berisolasi) Set 1.00
Pekerjaan Instalasi Elektrikal Pemasangan Unit Tata Udara
18 Non Standar Instalasi Daya AC Indoor Unit Kabel NYM 3x2,5 mm2 + Pipa Conduit 20mm M' 585.00
19 Non Standar Instalasi Daya AC Outdoor 38,200 BTU/H, Unit Kabel NYY 4x4 mm2 M' 30.00
20 Non Standar Instalasi Daya AC Outdoor 420,000 BTU/H, Unit Kabel NYY 4x10 mm2 M' 30.00
21 Non Standar Instalasi Daya AC Outdoor 382,000 BTU/H, Unit Kabel NYY 4x6 mm2 M' 30.00
22 Non Standar Exhaust Fan WC/KM Unit 29.00
23 Non Standar Titik Instalasi Daya Exhaust Unit Titik 29.00
JUMLAH PEKERJAAN SISTEM TATA UDARA
IV.1 PEKERJAAN SISTEM PEMADAM KEBAKARAN
1 Non Standar Hydrant Box Type A2 + Nozzle Unit 2.00
2 Non Standar Hydrant Box Type C + Nozzle Unit 2.00
3 Non Standar Hydrant Pillar Two Way Type Unit 2.00
4 Non Standar Siamesse Connection (SC) Unit 2.00
5 Non Standar APAR Liquid 5 Kg Unit 12.00
6 Non Standar Gate Valve dia 80 mm 10K Unit 4.00
7 Non Standar Check Valve dia 80 mm 10K Unit 2.00
8 Non Standar Pemipaan BSP Schedule 40 : Diameter 3" M' 85.00
9 Non Standar Pemipaan BSP Schedule 40 : Diameter 2" M' 55.00
10 Non Standar Fitting Pipa BSP Set 1.00
11 Civil Work (Galian, Menimbun Kembali Dan Bobok Dinding) Paket 1.00
JUMLAH PEKERJAAN SISTEM PEMADAM KEBAKARAN
TOTAL BIAYA DIVISI 5 - PEKERJAAN MEKANIKAL
RENCANA ANGGARAN BIAYA
SATUAN KERJA : KANTOR PELAYANAN PAJAK PRATAMA PALU
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR PELAYANAN PAJAK PRATAMA PALU
LOKASI : KOTA PALU
TAHUN ANGGARAN : 2021

No Kode Type URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
ANALISA Pekerjaan
a b c d e f g h=fxg
DIVISI 6 - PEKERJAAN ELEKTRKAL
PEKERJAAN ELEKTRIKAL
IV.1 PEKERJAAN PANEL LISTRIK, KABEL FEEDER DAN RAK KABEL
1 Pek. Sumber Listrik
Biaya Penambahan Daya Dari 53 kVa Ke 147 kVa + Biaya UJL + Biaya
- Non Standar SLO Paket 1.00
2 Pek. Panel Listrik
- Standar SDP-Gedung Unit 1.00
- Standar SDP-Pompa Unit 1.00
- Standar LP - SGP Unit 1.00
- Standar PP-AC SGP Unit 1.00
- Standar PP-PC SGP Unit 1.00
- Standar LP - SGS Unit 1.00
- Standar PP-AC SGS Unit 1.00
- Standar PP-PC SGS Unit 1.00
- Standar LP - SGA Unit 1.00
- Standar PP-AC SGA Unit 1.00
- Standar PP-Arus Lemah Unit 1.00
- Standar PP-Kontrol Server Unit 1.00
- Non Standar Panel UPS Unit 1.00
- Non Standar Pemasangan Kembali Panel ATS Eksisting Unit 1.00
3 Pek. Kabel Feeder
- Non Standar Dari PUTR Dan Genset Ke Panel ATS Eksisting, NYY 4 x 95 mm2 M' 28.00
- Non Standar Dari Panel ATS Eksisting Ke SDP-Gedung, NYY 4 x 95 mm2 M' 25.00
- Standar Dari SDP-Gedung Ke LP - SGP, NYY 4 x 4 mm2 M' 55.00
- Standar Dari SDP-Gedung Ke PP-AC SGP, NYY 4 x 6 mm2 M' 57.00
- Standar Dari SDP-Gedung Ke LP - SGS, NYY 4 x 4 mm2 M' 30.00
- Standar Dari SDP-Gedung Ke PP-AC SGS, NYY 4 x 16 mm2 M' 32.00
- Standar Dari SDP-Gedung Ke LP - SGA, NYY 4 x 2,5 mm2 M' 5.00
- Standar Dari SDP Gedung Ke PP-AC SGA, NYY 4 x 10 mm2 M' 12.00
- Standar Dari SDP-Gedung Ke SDP-Pompa, NYY 4 x 4 mm2 M' 50.00
- Standar Dari SDP-Gedung Ke Panel UPS, NYY 4 x 4 mm2 M' 10.00
- Standar Dari SDP-Gedung Ke PP-PC SGS, NYY 4 x 10 mm2 M' 43.00
- Standar Dari Panel UPS Ke PP-PC SGP, NYY 4 x 4 mm2 M' 58.00
- Standar Dari Panel UPS ke PP-Arus Lemah, NYY 4 x 2,5 mm2 M' 5.00
- Standar Dari Panel UPS ke PP-Kontrol Server, NYY 4 x 2,5 mm2 M' 7.00
4 Pek. Rak Kabel
- Standar Ukuran 40 cm (Arus Kuat), termasuk sambungan & penunjangya M' 197.30
- Standar Ukuran 20 cm (Arus Lemah), termasuk sambungan & penunjangya M' 175.10
JUMLAH PEKERJAAN PANEL LISTRIK, KABEL FEEDER DAN RAK KABEL
RENCANA ANGGARAN BIAYA
SATUAN KERJA : KANTOR PELAYANAN PAJAK PRATAMA PALU
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR PELAYANAN PAJAK PRATAMA PALU
LOKASI : KOTA PALU
TAHUN ANGGARAN : 2021

No Kode Type URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
ANALISA Pekerjaan
a b c d e f g h=fxg
IV.1 PEKERJAAN INSTALASI DAYA DAN ARMATUR PENERANGAN
1 Standar Saklar Tunggal Bh 23.00
2 Standar Saklar Ganda Bh 27.00
3 Standar Grid Switch 6 Gang Bh 2.00
4 Standar Grid Switch 4 Gang Bh 11.00
5 Standar Stop Kontak + Cover Bh 70.00
6 Standar Stop Kontak Lantai Bh 13.00
7 Standar Stop Kontak Lantai + Outlet Data Bh 117.00
8 Standar Stop Kontak Lantai + Outlet Tlp Bh 10.00
9 Standar Stop Kontak Lantai + Outlet Tlp + Outlet Data Bh 34.00
10 Standar Instalasi penerangan, NYM 3 x 2,5 mm2 + Pipa Conduit Titik 358.00
11 Standar Instalasi stop kontak, NYM 3 x 2,5 mm2 + Pipa Conduit Titik 244.00
12 Standar Downlight 4" + Lampu LED 18 Watt Bh 76.00
13 Standar Downlight 4" + Lampu LED 6 Watt Bh 50.00
14 Standar Lampu RM Cover Acrylic TL LED 2x14,5 Watt Include Battery Bh 4.00
15 Standar Lampu RM Cover Acrylic TL LED 2x14,5 Watt Bh 84.00
16 Standar Lampu LED Strip M' 178.00
17 Standar Downlight Lampu Spot LED 3 Watt Bh 18.00
18 Standar Lampu TKO TL LED 1x14,5 Watt Bh 23.00
19 Standar Lampu Trap Tangga Flat Bh 34.00
20 Standar Lampu Gantung Pantry Bh 1.00
21 Standar Lampu Baret Kotak 18 Watt Bh 10.00
22 Standar Lampu Spot LED 50 Watt Bh 10.00
23 Standar Lampu Hias Dinding Bh 6.00
24 Standar Lampu Hias Gantung Bh 1.00
25 Standar Lampu Hias Plafond Bh 1.00
26 Standar Lampu Mirror Ball (Ruang Karaoke) Bh 1.00
27 Standar Lampu Taman Bh 8.00
28 Standar Lampu Exit Bh 6.00
JUMLAH PEKERJAAN INSTALASI DAYA DAN ARMATUR PENERANGAN
RENCANA ANGGARAN BIAYA
SATUAN KERJA : KANTOR PELAYANAN PAJAK PRATAMA PALU
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR PELAYANAN PAJAK PRATAMA PALU
LOKASI : KOTA PALU
TAHUN ANGGARAN : 2021

No Kode Type URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
ANALISA Pekerjaan
a b c d e f g h=fxg
IV.1 PEKERJAAN INSTALASI TELEPHONE
A Pek. Peralatan Utama
1 Non Standar Biaya Penyambungan Baru Jaringan Telepon Line 8.00
2 Non Standar Instalasi Daya Alat Dari PP-AL Ke Unit, NYM 3 x 2,5 mm2 + Pipa Titik 1.00
Conduit
3 Non Standar PABX 8 Line / 24 Ext. Unit 1.00
4 Non Standar Kabel Dari PABX Ke MDF-TP, ITC 2 x 2 x 0,6 mm2 + Pipa Conduit M' 16.00
5 Non Standar MDF-TP Unit 1.00
6 Non Standar Kabel Dari MDF-TP Ke TBT-TP, ITC 2 x 2 x 0,6 mm2 + Pipa Conduit M' 805.00
B Non Standar Pek. Instalasi
1 Non Standar Terminal Box (TB-TP) Unit 2.00
2 Non Standar Titik instalasi Telephone, ITC 2 x 2 x 0,6 mm2 Titik 10.00
JUMLAH PEKERJAAN INSTALASI TELEPHONE
IV.1 PEKERJAAN INSTALASI TATA SUARA CENTRAL RUANG PELAYANAN
A Pek. Peralatan Utama
1 Non Standar Rak Equipment Unit 1.00
2 Non Standar Mic Paging (Ruang Loket TPT Dan Pos Pintu Masuk) Unit 2.00
3 Non Standar Mixer Frame With Usb Input Unit 1.00
4 Non Standar Equalizer Unit 1.00
5 Non Standar Selector Switch 4 Zone Unit 1.00
6 Non Standar Power Amplifier 1x120 Watt (Ruang Loket TPT Dan Pos Pintu Masuk) Unit 2.00
7 Non Standar Panel Tatas Suara 1 Unit 1.00
Instalasi Daya Alat Dari Panel Tata Suara 1 Ke Unit, NYM 3 x 2,5 mm2 +
8 Non Standar Pipa Conduit M' 20.00

9 Non Standar Instalasi Dari Panel Tata Suara 1 Ke PP-AL, NYM 3 x 2,5 mm2 + Pipa M' 55.00
Conduit
B Pek. Instalasi
Instalasi Utama Dari TB-TS Ke Peralatan Utama Tata Suara, NYMHY 3 x
1 Non Standar 2,5 mm2 + Pipa Conduit M' 20.00
2 Non Standar Terminal Box (TB-TS) Unit 1.00
3 Non Standar Column Speaker Unit 12.00
4 Non Standar Horn Speaker Unit 1.00
5 Non Standar Volume Control Unit 1.00
6 Non Standar Titik Instalasi Speaker, NYMHY 2 x 1,5 mm2 dalam conduit Titik 14.00
JUMLAH PEKERJAAN INSTALASI TATA SUARA CENTRAL RUANG PELAYANAN
IV.1 PEKERJAAN INSTALASI TATA SUARA CENTRAL RUANG SEKRETARIS
A Pek. Peralatan Utama
1 Non Standar Rak Equipment Unit 1.00
2 Non Standar Mic Paging Unit 1.00
3 Non Standar Mixer Frame With Usb Input Unit 1.00
4 Non Standar Equalizer Unit 1.00
5 Non Standar Selector Switch 10 Zone Unit 1.00
6 Non Standar Power Amplifier 2x240 Watt Unit 2.00
7 Non Standar Panel Tata Suara 2 Unit 1.00
8 Instalasi Daya
Non Standar Pipa Conduit Alat Dari Panel Tata Suara 2 Ke Unit, NYM 3 x 2,5 mm2 + M' 20.00

9 Non Standar Instalasi Dari Panel Tata Suara 2 Ke PP-AL, NYM 3 x 2,5 mm2 + Pipa M' 35.00
Conduit
Instalasi Utama Dari MDF-TS Ke Peralatan Utama Tata Suara, NYMHY
10 Non Standar 3 x 2,5 mm2 + Pipa Conduit M' 20.00
11 Non Standar MDF-TS Bh 1.00
12 Non Standar Instalasi Dari TBS Ke MDF-TS, NYMHY 3 x 2,5 mm2 + Pipa Conduit M' 40.00
B Pek. Instalasi
1 Non Standar Terminal Box (TB-TS) Unit 3.00
2 Non Standar Ceiling Speaker Unit 64.00
3 Non Standar Volume Control Unit 5.00
RENCANA ANGGARAN BIAYA
SATUAN KERJA : KANTOR PELAYANAN PAJAK PRATAMA PALU
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR PELAYANAN PAJAK PRATAMA PALU
LOKASI : KOTA PALU
TAHUN ANGGARAN : 2021

No Kode Type URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
ANALISA Pekerjaan
a b c d e f g h=fxg
4 Non Standar Titik Instalasi Speaker, NYMHY 2 x 1,5 mm2 dalam conduit Titik 69.00
JUMLAH PEKERJAAN INSTALASI TATA SUARA CENTRAL RUANG SEKRETARIS
RENCANA ANGGARAN BIAYA
SATUAN KERJA : KANTOR PELAYANAN PAJAK PRATAMA PALU
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR PELAYANAN PAJAK PRATAMA PALU
LOKASI : KOTA PALU
TAHUN ANGGARAN : 2021

No Kode Type URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
ANALISA Pekerjaan
a b c d e f g h=fxg
IV.1 PEKERJAAN INSTALASI TATA SUARA CENTRAL RUANG VICON
A Pek. Peralatan Utama
1 Non Standar Rak Equipment Unit 1.00
2 Non Standar Mic Paging Unit 11.00
3 Non Standar Power Amplifier 1x120 Watt Unit 1.00
4 Non Standar Mixer Frame With Usb Input Unit 1.00
5 Non Standar System Video Conference Set 1.00
Non Standar - USB PTZ Camera (Aver VC520 Pro)
Non Standar - Aver Expansion Microphone
Non Standar - Rak Monitor Dan Camera
Non Standar - Monitor 70 Inch UHD 4K (Samsung Smart TV)
Non Standar - Audio, Video, UTP Dan HDMI Cable
6 Non Standar HDMI Switch 8 Port Unit 1.00
7 Non Standar Panel Tata Suara 3 Unit 1.00
Instalasi Daya Alat Dari Panel Tata Suara 3 Ke Unit, NYM 3 x 2,5 mm2 +
8 Non Standar M' 10.00
Pipa Conduit

9 Non Standar Instalasi Dari Panel Tata Suara 3 Ke PP-AL, NYM 3 x 2,5 mm2 + Pipa M' 35.00
Conduit
B Pek. Instalasi
1 Non Standar Instalasi Utama Ke Peralatan Utama Tata Suara, NYMHY 3 x 2,5 mm2 + M' 20.00
Pipa Conduit
2 Non Standar Column Speaker Unit 4.00
3 Non Standar Titik Instalasi Speaker, NYMHY 2 x 1,5 mm2 dalam conduit Titik 4.00
JUMLAH PEKERJAAN INSTALASI TATA SUARA CENTRAL RUANG VICON
IV.1 PEKERJAAN INSTALASI TATA SUARA CENTRAL RUANG INSPIRASI
A Pek. Peralatan Utama
1 Non Standar Rak Equipment Unit 1.00
2 Non Standar Power Amplifier 1x120 Watt Unit 1.00
3 Non Standar Mixer Frame With Usb Input Unit 1.00
B Pek. Instalasi
1 Non Standar Instalasi Utama Ke Peralatan Utama Tata Suara, NYMHY 3 x 2,5 mm2 + M' 20.00
Pipa Conduit
2 Non Standar Column Speaker Unit 4.00
3 Non Standar Titik Instalasi Speaker, NYMHY 2 x 1,5 mm2 dalam conduit Titik 4.00
JUMLAH PEKERJAAN INSTALASI TATA SUARA CENTRAL RUANG INSPIRASI
IV.1 PEKERJAAN INSTALASI TATA SUARA CENTRAL RUANG AULA
A Pek. Peralatan Utama
1 Non Standar Rak Equipment Unit 1.00
2 Non Standar Mixer Frame Unit 1.00
3 Non Standar Equalizer Unit 1.00
4 Non Standar Power Amplifier 1x240 Watt Unit 1.00
5 Non Standar Panel Tata Suara 4 Unit 1.00
Instalasi Daya Alat Dari Panel Tata Suara 4 Ke Unit, NYM 3 x 2,5 mm2 +
6 Non Standar Pipa Conduit M' 15.00
Instalasi Dari Panel Tata Suara 4 Ke PP-AL, NYM 3 x 2,5 mm2 + Pipa
7 Non Standar Conduit M' 35.00
B Pek. Instalasi
1 Non Standar Instalasi Utama Ke Peralatan Utama Tata Suara, NYMHY 3 x 2,5 mm2 + M' 30.00
Pipa Conduit
2 Non Standar Speaker Gantung + Breaket Unit 4.00
3 Non Standar Ceiling Speaker Unit 11.00
4 Non Standar Titik Instalasi Speaker, NYMHY 2 x 1,5 mm2 dalam conduit Titik 15.00
JUMLAH PEKERJAAN INSTALASI TATA SUARA CENTRAL RUANG AULA
RENCANA ANGGARAN BIAYA
SATUAN KERJA : KANTOR PELAYANAN PAJAK PRATAMA PALU
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR PELAYANAN PAJAK PRATAMA PALU
LOKASI : KOTA PALU
TAHUN ANGGARAN : 2021

No Kode Type URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
ANALISA Pekerjaan
a b c d e f g h=fxg
IV.1 PEKERJAAN INSTALASI MATV
A Pek. Peralatan Utama
1 Non Standar Biaya Penyambungan Baru Jaringan Televisi Set 1.00
Non Standar - Receiver HD/DSD 30 Unit
Non Standar - Kabel HDMI
Non Standar - Kartu Tayang
Non Standar - LNB S Band 4 Unit
Non Standar - Remote 30 Unit
Non Standar - Kabel RG 6 Area Central
Non Standar - Switcher 8 Unit
Non Standar - Splitter 4 Unit
Non Standar - Line Amplifier 4 Unit
Non Standar - Parabola Mini 4 Set
2 Non Standar Instalasi Daya Peralatan Ke PP-AL, NYM 3 x 2,5 mm2 + Pipa Conduit M' 50.00
B Pek. Instalasi
1 Non Standar Instalasi Dari Outlet MATV Ke Receiver, Coaxial RG 11 + Pipa Conduit M' 600.00
2 Non Standar Outlet TV Unit 30.00
JUMLAH PEKERJAAN INSTALASI MATV
IV.1 PEKERJAAN INSTALASI DATA/LAN
A Pek. Peralatan Utama
1 Non Standar Biaya Penyambungan Baru Jaringan Data/Lan Set 1.00
2 Non Standar Pemasangan Kembali Rak Equipment Unit 1.00
3 Non Standar Pemasangan Kembali Switch Hub 24 Port Unit 2.00
4 Non Standar Pemasangan Kembali Switch Hub 20 Port Unit 6.00
5 Non Standar Instalasi Dari Modem Ke Switch Hub, Coaxial RG 11 + Pipa Conduit M' 600.00
Instalasi Daya Peralatan Ke PP-Kontrol Server, NYM 3 x 2,5 mm2 + Pipa
6 Non Standar Conduit M' 115.00
B Pek. Instalasi
1 Non Standar Titik instalasi, UTP Cat 6 (dalam conduit) M' 3080.00
2 Non Standar Outlet Data Type Wall Unit 3.00
JUMLAH PEKERJAAN INSTALASI DATA/LAN
RENCANA ANGGARAN BIAYA
SATUAN KERJA : KANTOR PELAYANAN PAJAK PRATAMA PALU
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR PELAYANAN PAJAK PRATAMA PALU
LOKASI : KOTA PALU
TAHUN ANGGARAN : 2021

No Kode Type URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
ANALISA Pekerjaan
a b c d e f g h=fxg
IV.1 PEKERJAAN INSTALASI FIRE ALARM
A Pek. Peralatan Utama
1 Non Standar MCFA 5 Zone Konvensional Unit 1.00
2 Non Standar Instalasi Daya Alat Dari PP-AL Ke Unit, NYM 3 x 2,5 mm2 + Pipa Titik 1.00
Conduit
3 Non Standar Instalasi AC Shutdown Ke Panel AC, NYM 3 x 2,5 mm2 + Pipa Conduit M' 150.00
B Pek. Instalasi Fire Alarm
1 Non Standar TB-FA Unit 3.00
2 Non Standar Kabel Dari MCFA Ke TBFA M' 90.00
3 Non Standar Smoke Detector Unit 51.00
4 Non Standar Heat Detector Unit 61.00
5 Non Standar Manual Breack Glass Unit 3.00
6 Non Standar Bell Alarm Unit 3.00
7 Non Standar Indicator Lamp Unit 3.00
8 Non Standar Instalasi Detector, NYA 2(1x 1,5) mm2 Titik 112.00
9 Non Standar Instalasi Bell & Indicator, NYA 2(1x 1,5) mm2 Titik 3.00
10 Non Standar Instalasi Manual Breack Glass, NYA 2(1x 1,5) mm2 Titik 3.00
JUMLAH PEKERJAAN INSTALASI FIRE ALARM
IV.1 PEKERJAAN INSTALASI CCTV
A Pek. Peralatan Utama
1 Non Standar Pemasangan DVDR Eksisting 16 Channel Unit 1.00
2 Non Standar Pemasangan DVDR Audio Eksisting Unit 6.00
3 Non Standar Digital Video Recorder 8 Channel Unit 1.00
4 Non Standar Pemasangan Monitor Eksisting Unit 1.00
5 Non Standar Instalasi Daya Peralatan Ke PP-AL, NYM 3 x 2,5 mm2 + Pipa Conduit M' 50.00
B Pek. Instalasi
1 Non Standar Dome Camera Unit 11.00
2 Non Standar Dome Camera + Audio Unit 6.00
3 Non Standar Fixed Camera Unit 12.00
4 Non Standar Titik instalasi, Coaxial Cable RG59 (dalam conduit) Titik 23.00
JUMLAH PEKERJAAN INSTALASI CCTV
IV.1 PEKERJAAN SISTEM PENTANAHAN (GROUNDING)
A Pekerjaan Penangkal Petir
1 Non Standar Stik Penangkal Petir Unit 20.00
2 Non Standar Pek. Kabel BC 50 mm + Aksesoris M' 80.00
3 Non Standar Pek. Tiang Galvanis + Pipa Kabel BC Set 1.00
4 Non Standar Pek. Grounding System Max. 5 Ohm Set 1.00
Copper Rod, Clamp Rod, BAR CU
5 Non Standar Bak Kontrol Unit 4.00
B Pekerjaan Grounding Arus Lemah
1 Non Standar Pek. Kabel BC 4 mm + Aksesoris M' 30.00
2 Non Standar Pek. Grounding System Max. 1 Ohm Set 1.00
Copper Rod, Clamp Rod, BAR CU
3 Non Standar Bak Kontrol Unit 1.00
B Pekerjaan Grounding Arus Kuat
1 Non Standar Pek. Kabel BC 95 mm + Aksesoris M' 50.00
2 Non Standar Pek. Grounding System Max. 5 Ohm Set 1.00
Copper Rod, Clamp Rod, BAR CU
3 Non Standar Bak Kontrol Unit 1.00
JUMLAH PEKERJAAN SISTEM PENTANAHAN (GROUNDING)
TOTAL BIAYA DIVISI 6 - PEKERJAAN ELEKTRKAL
RENCANA ANGGARAN BIAYA
SATUAN KERJA : KANTOR PELAYANAN PAJAK PRATAMA PALU
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR PELAYANAN PAJAK PRATAMA PALU
LOKASI : KOTA PALU
TAHUN ANGGARAN : 2021

No Kode Type URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
ANALISA Pekerjaan
a b c d e f g h=fxg
I PEKERJAAN POS PENJAGAAN MASUK
A Pekerjaan Tanah
1 Standar Pek. Galian Tanah M3 10.44
2 Standar Pek. Buangan Bekas Galian M3 4.12
3 Standar Pek. Urugan Kembali Bekas Galian M3 6.32
4 Standar Pek. Timbunan Sirtu M3 15.15
5 Standar Pek. Urugan Pasir Pondasi dan Lantai M3 2.43
6 Standar Pek. Pemadatan Tanah M3 2.43
B Pek. Pondasi
1 Standar Pek. Pasangan Batu Camp. 1 Pc : 5 Ps M3 7.42
2 Standar Pek. Pasangan Batu Kosong M3 2.61
C Pekerjaan Sloof & Rabat Beton
1 Standar Pek. Lantai Kerja M3 3.49
2 Standar Pek. Beton Sloof (K175) M3 0.96
3 Standar Pek. Pembesian Kg 209.03
4 Standar Pek. Bekisting M2 12.76
D Pekerjaan Kolom
1 Standar Pek. Beton (K175) M3 1.49
2 Standar Pek. Pembesian Kg 211.91
3 Standar Pek. Bekisting M2 29.80
E Pekerjaan Sunscreen Beton
1 Standar Pek. Beton (K175) M3 0.57
2 Standar Pek. Pembesian Kg 62.47
3 Standar Pek. Bekisting M2 7.76
F Pekerjaan Kolom, Balok Praktis Dan Ringbalk
1 Standar Pek. Beton Kolom Praktis M' 14.67
2 Standar Pek. Beton Balok Praktis M' 45.33
G Pek. Dinding Dan Fasade
1 Standar Pek. Pasangan Dinding 1/2 Bata Camp. 1 Pc : 5 Ps M2 71.89
2 Standar Pek. Plesteran Camp. 1 Pc : 5 Ps M2 143.78
3 Standar Pek. Acian M2 133.28
4 Standar Pek. Pengecatan M2 133.28
5 Standar Pek. Homogenus Tile Dinding 30x60 (Tinggi 2.3 m) M2 10.50
H Pekerjaan Atap Dan Langit-Langit
1 Standar Pek. Atap Bitumen Ondu Villa + Rangka Baja Ringan M2 60.44
2 Standar Pek. Listplank M' 30.50
3 Standar Pek. Langit-Langit Gypsum+ Rangka Hollow M2 20.82
4 Standar Pek. Langit-Langit Kalsiboard + Rangka Hollow M2 31.08
5 Standar Pek. List Gypsum M' 101.00
6 Standar Pek. Manhole (Area Toilet) Bh 1.00
I Pekerjaan Pintu Dan Jendela
1 Standar Pek. Pintu Type 1 Set 2.00
2 Standar Pek. Pintu Type 2 Set 1.00
3 Standar Pek. Curtain Wall Set 1.00
4 Standar Pek. Jendela Set 1.00
5 Standar Pek. Ventilasi Set 1.00
J Pekerjaan Tegel Lantai
Pek. Homogenus Tile Type Unpolished Uk. 30 X 30 cm (KM/WC Dan
1 Standar Tangga Masuk) M2 7.78
2 Standar Pek. Tegel Homogenous Tile Type Polished Ukuran 60 X 60 cm M2 26.84
3 Standar Pek. Plint Homogenous Tile 10x60 M' 33.50
K Pekerjaan Mekanikal Dan Plumbing
1 Standar Pompa Dorong Unit 1.00
2 Standar Instalasi Daya Pompa Kabel NYM 3 x 2,5 mm2 M' 20.00
3 Standar Pipa PVC Type AW Diameter 1" (Pipa Distribusi) M' 110.00
4 Standar Pipa PVC Type AW Diameter 1/2" (Cabang Outlet) M' 2.10
5 Standar Valve Dimensi 1" Bh 1.00
6 Standar Pipa PVC Type AW Diameter 3" (Pipa Air Bekas) M' 4.00
RENCANA ANGGARAN BIAYA
SATUAN KERJA : KANTOR PELAYANAN PAJAK PRATAMA PALU
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR PELAYANAN PAJAK PRATAMA PALU
LOKASI : KOTA PALU
TAHUN ANGGARAN : 2021

No Kode Type URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
ANALISA Pekerjaan
a b c d e f g h=fxg
7 Standar Pipa PVC Type AW Diameter 4" (Pipa Air Kotor) M' 4.00
8 Standar Kloset Duduk (Toto Type CW 660 NJ) Unit 1.00
9 Standar Jet Washer Toilet (Toto Tipe TX20NB) Unit 1.00
9 Standar Tissue Holder Unit 1.00
10 Standar Liquid Soap Dispenser (Toto Tipe TS125R) Unit 1.00
11 Standar Cermin Unit 1.00
12 Standar Kran Air (TOTO Type TX130L) Unit 1.00
13 Standar Floor Drain (Toto) Unit 1.00
14 Standar Towel Bar Unit 1.00
15 Standar Pek. BioSeptiktank Kapasitas 3 m3 Set 1.00
16 Standar Fitting Pipa PVC Type AW Set 1.00
17 Standar Civil Work (Galian, Menimbun Kembali Dan Bobokan Dinding) Paket 1.00
L Pekerjaan Elektrikal
1 Standar Pek. Box Hager + MCB Unit 1.00
2 Standar Pek. Kabel Dari Sumber Ke MCB, NYFGBY 4 x 2,5 mm2 M' 110.00
3 Standar Pek. Saklar Ganda Unit 3.00
4 Standar Pek. Stop Kontak + Cover Unit 5.00
5 Standar Downlight 4" + Lampu LED 18 Watt Bh 6.00
6 Standar Downlight 4" + Lampu LED 6 Watt Bh 1.00
7 Standar Stop Kontak AC Unit 1.00
8 Standar Exhaust Fan WC/KM Unit 1.00
9 Standar Instalasi, NYM 3 x 2,5 mm2 + Pipa Conduit Titik 14.00
TOTAL BIAYA PEKERJAAN POS PENJAGAAN MASUK
II PEKERJAAN POS PENJAGAAN KELUAR
A Pekerjaan Tanah
1 Standar Pek. Galian Tanah M3 10.44
2 Standar Pek. Buangan Bekas Galian M3 4.12
3 Standar Pek. Urugan Kembali Bekas Galian M3 6.32
4 Standar Pek. Timbunan Sirtu M3 15.15
5 Standar Pek. Urugan Pasir M3 2.43
6 Standar Pek. Pemadatan Tanah M3 2.43
B Pek. Pondasi
1 Standar Pek. Pasangan Batu Camp. 1 Pc : 5 Ps M3 7.42
2 Standar Pek. Pasangan Batu Kosong M3 2.61
C Pekerjaan Sloof & Rabat Beton
1 Standar Pek. Lantai Kerja M3 3.49
2 Standar Pek. Beton Sloof (K175) M3 0.96
3 Standar Pek. Pembesian Kg 209.03
4 Standar Pek. Bekisting M2 12.76
D Pekerjaan Kolom
1 Standar Pek. Beton (K175) M3 1.49
2 Standar Pek. Pembesian Kg 211.91
3 Standar Pek. Bekisting M2 29.80
E Pekerjaan Sunscreen Beton
1 Standar Pek. Beton (K175) M3 0.57
2 Standar Pek. Pembesian Kg 62.47
3 Standar Pek. Bekisting M2 7.76
F Pekerjaan Kolom, Balok Praktis Dan Ringbalk
1 Standar Pek. Beton Kolom Praktis M' 14.67
2 Standar Pek. Beton Balok Praktis M' 45.33
G Pek. Dinding Dan Fasade
1 Standar Pek. Pasangan Dinding 1/2 Bata Camp. 1 Pc : 5 Ps M2 71.89
2 Standar Pek. Plesteran Camp. 1 Pc : 5 Ps M2 143.78
3 Standar Pek. Acian M2 133.28
4 Standar Pek. Pengecatan M2 133.28
5 Standar Pek. Homogenus Tile Dinding 30x60 (Tinggi 2.3 m) M2 10.50
RENCANA ANGGARAN BIAYA
SATUAN KERJA : KANTOR PELAYANAN PAJAK PRATAMA PALU
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR PELAYANAN PAJAK PRATAMA PALU
LOKASI : KOTA PALU
TAHUN ANGGARAN : 2021

No Kode Type URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
ANALISA Pekerjaan
a b c d e f g h=fxg
H Pekerjaan Atap Dan Langit-Langit
1 Standar Pek. Atap Bitumen Ondu Villa + Rangka Baja Ringan M2 60.44
2 Standar Pek. Listplank M' 30.50
3 Standar Pek. Langit-Langit Gypsum+ Rangka Hollow M2 20.82
4 Standar Pek. Langit-Langit Kalsiboard + Rangka Hollow M2 31.08
5 Standar Pek. List Gypsum M' 101.00
6 Standar Pek. Manhole (Area Toilet) Bh 1.00
II Pekerjaan Pintu Dan Jendela
1 Standar Pek. Pintu Type 1 Set 2.00
2 Standar Pek. Pintu Type 2 Set 1.00
3 Standar Pek. Curtain Wall Set 1.00
4 Standar Pek. Jendela Set 1.00
5 Standar Pek. Ventilasi Set 1.00
J Pekerjaan Tegel Lantai
Pek. Homogenus Tile Type Unpolished Uk. 30 X 30 cm (KM/WC Dan
1 Standar Tangga Masuk) M2 7.78

2 Standar Pek. Tegel Homogenous Tile Type Polished Ukuran 60 X 60 cm M2 26.84


3 Standar Pek. Plint Homogenous Tile 10x60 M' 33.50
K Pekerjaan Mekanikal Dan Plumbing
1 Standar Pompa Dorong Unit 1.00
2 Standar Instalasi Daya Pompa Kabel NYM 3 x 2,5 mm2 M' 20.00
3 Standar Pipa PVC Type AW Diameter 1" (Pipa Distribusi) M' 110.00
4 Standar Pipa PVC Type AW Diameter 1/2" (Cabang Outlet) M' 2.10
5 Standar Valve Dimensi 1" Bh 1.00
6 Standar Pipa PVC Type AW Diameter 3" (Pipa Air Bekas) M' 4.00
7 Standar Pipa PVC Type AW Diameter 4" (Pipa Air Kotor) M' 4.00
8 Standar Kloset Duduk (Toto Type CW 660 NJ) Unit 1.00
9 Standar Jet Washer Toilet (Toto Tipe TX20NB) Unit 1.00
10 Standar Tissue Holder Unit 1.00
11 Standar Liquid Soap Dispenser (Toto Tipe TS125R) Unit 1.00
12 Standar Cermin Unit 1.00
13 Standar Kran Air (TOTO Type TX130L) Unit 1.00
14 Standar Floor Drain (Toto) Unit 1.00
15 Standar Towel Bar Unit 1.00
16 Standar Pek. BioSeptictank Kapasitas 3 m3 Set 1.00
17 Standar Fitting Pipa PVC Type AW Set 1.00
18 Standar Civil Work (Galian, Menimbun Kembali Dan Bobokan Dinding) Paket 1.00
L Pekerjaan Elektrikal
1 Standar Pek. Box Hager + MCB Unit 1.00
2 Standar Pek. Kabel Dari Sumber Ke MCB, NYFGBY 4 x 2,5 mm2 M' 110.00
3 Standar Pek. Saklar Ganda Unit 3.00
4 Standar Pek. Stop Kontak + Cover Unit 5.00
5 Standar Downlight 4" + Lampu LED 18 Watt Bh 6.00
6 Standar Downlight 4" + Lampu LED 6 Watt Bh 1.00
7 Standar Stop Kontak AC Unit 1.00
8 Standar Exhaust Fan WC/KM Unit 1.00
9 Standar Instalasi, NYM 3 x 2,5 mm2 + Pipa Conduit Titik 14.00
TOTAL BIAYA PEKERJAAN POS PENJAGAAN KELUAR
RENCANA ANGGARAN BIAYA
SATUAN KERJA : KANTOR PELAYANAN PAJAK PRATAMA PALU
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR PELAYANAN PAJAK PRATAMA PALU
LOKASI : KOTA PALU
TAHUN ANGGARAN : 2021

No Kode Type URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
ANALISA Pekerjaan
a b c d e f g h=fxg
III PEKERJAAN RUANG POMPA, GWT DAN RUANG GENSET
A Pek. Tanah
1 Standar Pek. Galian Tanah M3 13.82
2 Standar Pek. Buangan Bekas Galian M3 13.82
3 Standar Pek. Timbunan Sirtu M3 8.00
4 Standar Pek. Urugan Pasir M3 1.72
5 Standar Pek. Pemadatan Tanah M3 1.72
B Pek. Pondasi
1 Standar Pek. Pasangan Batu Camp. 1 Pc : 5 Ps M3 1.90
2 Standar Pek. Pasangan Batu Kosong M3 0.81
C Pek. Struktur Lantai
1 Standar Pek. Lantai Kerja (GWT dan Lantai) M3 1.60
2 Standar Pek. Beton K 175 (Plat GWT) M3 1.66
3 Standar Pek. Pembesian Kg 298.47
4 Standar Pek. Bekisting M2 6.31
D Pek. Dinding Beton GWT
1 Standar Pek. Beton K 175 M3 4.21
2 Standar Pek. Pembesian Kg 291.21
3 Standar Pek. Bekisting M2 28.03
E Pekerjaan Sloof
1 Standar Pek. Beton K 175 M3 0.32
2 Standar Pek. Pembesian Kg 58.47
3 Standar Pek. Bekisting M2 4.27
F Pekerjaan Kolom Utama Dan Kolom Praktis
1 Standar Pek. Beton K 175 M3 1.03
2 Standar Pek. Pembesian Kg 103.70
3 Standar Pek. Bekisting M2 16.50
4 Standar Pek. Beton Kolom Praktis M' 11.11
G Pekerjaan Ringbalk & Ring Balok Praktis
1 Standar Pek. Beton K 175 M3 0.65
2 Standar Pek. Pembesian Kg 119.12
3 Standar Pek. Bekisting M2 3.84
4 Standar Pek. Ring Balk Praktis/Latai M3 4.89
H Pek. Plat Atap Beton dan Sunscreen
1 Standar Pek. Beton K 175 M3 2.65
2 Standar Pek. Pembesian Kg 424.00
3 Standar Pek. Bekisting M2 25.94
I Pek. Finishing
1 Standar Pek. Pasangan Dinding 1/2 Bata Camp. 1 Pc : 5 Ps M2 59.34
2 Standar Pek. Plesteran Camp. 1 Pc : 5 Ps M2 118.68
3 Standar Pek. Acian M2 118.68
4 Standar Pek. Pengecatan M2 164.96
5 Standar Pek. Pintu Besi Rg. Genset (Besi Hollow) Include Engsel dan Kunci Set 1.00
6 Standar Pek. Pintu Besi Rg. Pompa (Besi Hollow) Include Engsel dan Kunci Set 1.00
7 Standar Pek. Sekat genset (Besi Hollow 2x4) Set 1.00
7 Standar Pek. Roster Ventilasi Bh 8.00
8 Standar Pek. Expose Langit-Langit M2 12.21
9 Standar Pek. Pengecatan Langit-Langit M2 12.21
10 Standar Pek. Waterproofing Fiberglass M2 25.94
11 Standar Pek. Tangga Monyet Unit 1.00
12 Standar Pek. Tutup Manhole Besi Plat Unit 1.00
13 Standar Pek. Lantai Homogenus Tile Uk. 50x50 (Unpolished) area teras M2 11.56
RENCANA ANGGARAN BIAYA
SATUAN KERJA : KANTOR PELAYANAN PAJAK PRATAMA PALU
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR PELAYANAN PAJAK PRATAMA PALU
LOKASI : KOTA PALU
TAHUN ANGGARAN : 2021

No Kode Type URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
ANALISA Pekerjaan
a b c d e f g h=fxg
J Pek. Utilitas
1 Standar Pek. Box Hager + MCB Unit 1.00
2 Standar Pek. Kabel Dari Sumber Ke MCB, NYFGBY 4 x 2,5 mm2 M' 20.00
3 Standar Pek. Saklar Tunggal Unit 2.00
4 Standar Pek. Stop Kontak + Cover Unit 2.00
5 Standar Pek. Lampu TKO 1x14,5 Watt Bh 4.00
6 Standar Pek. Instalasi, NYM 3 x 2,5 mm2 + Pipa Conduit Titik 6.00
TOTAL BIAYA PEKERJAAN RUANG POMPA, GWT DAN RUANG GENSET
IV PEKERJAAN TIANG BENDERA DAN SKUPTURL
A Pek. Tanah
1 Standar Pek. Galian Tanah M3 0.96
2 Standar Pek. Buangan Bekas Galian M3 0.80
3 Standar Pek. Urugan Kembali Bekas Galian M3 0.16
4 Standar Pek. Urugan Pasir M3 1.27
5 Standar Pek. Timbunan Sirtu M3 33.68
6 Standar Pek. Pemadatan Tanah M3 34.95
B Pek. Pondasi Poor Plat
1 Standar Pek. Lantai Kerja M3 0.03
2 Standar Pek. Beton K250 M3 0.13
3 Standar Pek. Pembesian Kg 26.93
4 Standar Pek. Bekisting M2 0.64
C Pekerjaan Kolom Pedestal
1 Standar Pek. Beton K250 M3 0.09
2 Standar Pek. Pembesian Kg 13.28
3 Standar Pek. Bekisting M2 1.71
D Pekerjaan Beton Tiang Bendera
1 Standar Pek. Beton M3 0.53
2 Standar Pek. Pembesian Kg 101.52
3 Standar Pek. Bekisting M2 9.18
E Pekerjaan Beton Skupturl
1 Standar Pek. Beton K175 M3 1.16
2 Standar Pek. Pembesian Kg 127.13
3 Standar Pek. Bekisting M2 11.78
G Pekerjaan Finishing
1 Standar Pek. Pasangan Dinding 1/2 Bata Camp. 1 Pc : 5 Ps M2 153.25
2 Standar Pek. Plesteran Camp. 1 Pc : 5 Ps M2 35.53
3 Standar Pek. Acian M2 35.53
4 Standar Pek. Klem Dan Tali Bendera Type Karmantel 8m Set 1.00
5 Standar Pek. Pengecatan M2 35.53
6 Standar Pek. Batu Alam M2 16.08
Pek. Lantai Homogenus Tile Type Unpolished Uk. 40 X 40 cm (Area Tiang
7 Standar M2 38.97
Bendera) Include Bevel Area Tepi
8 Standar Sewa Alat Skafolding Utk pengecoran Tiang bendera (1 Bulan) Set 6.00
TOTAL BIAYA PEKERJAAN TIANG BENDERA DAN SKUPTURL
V PEKERJAAN JALAN DAN LANDSCAPE RUANG TERBUKA HIJAU
A Pekerjaan Tanah
1 Standar Pek. Galian Tanah (Perataan) M3 44.50
2 Standar Pek. Buangan Bekas Galian M3 44.50
3 Standar Pek. Urugan Pasir M3 6.03
B Pekerjaan Saluran
1 Standar Saluran Air Kawasan + Gril Penutup Saluran (Besi strip+rangka siku 4x4) M' 220.82
2 Standar Bak Kontrol Saluran Air Bh 23.00
Cor Beton Saluran Tertutup
3 Standar Pek. Beton (K175) Tebal 10 cm M3 1.92
4 Standar Pek. Pembesian Kg 210.43
5 Standar Pek. Bekisting M2 19.20
6 Standar Pipa PVC Type AW Diameter 4" M' 134.50
RENCANA ANGGARAN BIAYA
SATUAN KERJA : KANTOR PELAYANAN PAJAK PRATAMA PALU
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR PELAYANAN PAJAK PRATAMA PALU
LOKASI : KOTA PALU
TAHUN ANGGARAN : 2021

No Kode Type URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
ANALISA Pekerjaan
a b c d e f g h=fxg
C Pekerjaan Stopper Ban Area Parkir
1 Standar Pek. Beton K-250 M3 1.08
2 Standar Pek. Bekisting M2 22.68
3 Standar Pek. Pengecatan M2 22.68
D Pekerjaan Jalan Kawasan
1 Standar Pek. Paving Blok K-300 (Include Pasir Urug) M2 3310.17
2 Standar Pek. Kansteen 20x30x60 M' 413.52
3 Standar Pek. Pengecetan Kansteen M2 42.35
4 Standar Pek. Pengecatan Marka Area Parkir (Cat Marka Jalan) M2 42.35
E Pek. Lampu Jalan
1 Standar Pek. PJU 60 Watt Type Solar Cell + Tiang Listrik Octagonal 6m Unit 4.00
2 Standar Lampu Taman Bh 8.00
3 Standar Pek. Instalasi Kabel NYFGBY 4x2,5mm2 M' 400.00
4 Standar PP-Outdoor Unit 1.00
5 Standar Dari SDP ke PP-Outdoor, NYY 4 x 2,5 mm2 M' 5.00
F Pekerjaan Ruang Terbuka Hijau Dan Vegetasi
1 Standar Pek. Rumput Gajah Mini Include pemeliharaan M2 1771.56
#REF! Standar Pek. Penanaman Pohon (Minimal tinggi 2 meter) include pemeliharaan Phn 57.00
#REF! Standar Pek. Kran Tugu Taman (TOTO Type TX130L) Bh 6.00
TOTAL BIAYA PEKERJAAN JALAN DAN LANDSCAPE RUANG TERBUKA HIJAU
VI PEKERJAAN PAGAR
A Pek. Tanah
1 Standar Pek. Galian Tanah M3 154.35
2 Standar Pek. Buangan Bekas Galian M3 48.73
3 Standar Pek. Urugan Kembali Bekas Galian M3 105.62
4 Standar Pek. Urugan Pasir M3 14.12
5 Standar Pek. Pemadatan Tanah M3 14.12
6 Standar Pek. Tanah Subur M3 563.05
B Pek. Pondasi
1 Standar Pek. Pasangan Batu Camp. 1 Pc : 5 Ps M3 94.28
2 Standar Pek. Pasangan Batu Kosong M3 39.08
3 Standar Pek. Lantai Kerja Poor Plat M3 1.06
4 Standar Pek. Beton Telapak (K175) M3 4.22
5 Standar Pek. Pembesian Kg 868.93
6 Standar Pek. Bekisting M2 21.12
C Pekerjaan Sloof 15x20
1 Standar Pek. Beton K175 M3 10.53
2 Standar Pek. Pembesian Kg 2157.50
3 Standar Pek. Bekisting M2 140.22
D Pekerjaan Kolom 30x30
1 Standar Pek. Beton K175 M3 0.41
2 Standar Pek. Pembesian Kg 32.27
3 Standar Pek. Bekisting M2 5.52
E Pekerjaan Kolom 20x20
1 Standar Pek. Beton K175 M3 4.72
2 Standar Pek. Pembesian Kg 685.52
3 Standar Pek. Bekisting M2 95.02
F Pekerjaan Kolom 15x35
1 Standar Pek. Beton K175 M3 1.66
2 Standar Pek. Pembesian Kg 234.62
3 Standar Pek. Bekisting M2 30.36
G Pekerjaan Kolom Praktis Dan Balok Praktis
1 Standar Pek. Kolom (Termasuk Bekisting Dan Pembesian) M' 112.00
2 Standar Pek. Balok (Termasuk Bekisting Dan Pembesian) M' 28.44
H Pekerjaan Balok 15x20
1 Standar Pek. Beton K175 M3 5.80
2 Standar Pek. Pembesian Kg 1195.93
3 Standar Pek. Bekisting M2 77.43
RENCANA ANGGARAN BIAYA
SATUAN KERJA : KANTOR PELAYANAN PAJAK PRATAMA PALU
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR PELAYANAN PAJAK PRATAMA PALU
LOKASI : KOTA PALU
TAHUN ANGGARAN : 2021

No Kode Type URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
ANALISA Pekerjaan
a b c d e f g h=fxg
I Pekerjaan Pelat 10x40
1 Standar Pek. Beton K175 M3 0.52
2 Standar Pek. Pembesian Kg 54.69
3 Standar Pek. Bekisting M2 2.60
J Pekerjaan Finishing

1 Standar Pek. Pasangan Dinding 1/2 Bata Camp. 1 Pc : 5 Ps M2 623.53

2 Standar Pek. Plesteran Camp. 1 Pc : 5 Ps (Include motif penebalan Plesteran Pagar) M2 1530.07

3 Standar Pek. Plester Ciprat M2 161.02


4 Standar Pek. Acian M2 1842.72
5 Standar Pek. Pengecatan M2 1842.72
6 Standar Pek. Papan Nama Stanless Steal + Lampu LED M2 5.10
7 Standar Pek. Papan Nama Acrylic Area Dinding Entrance Set 1.00
8 Standar Pek. Pagar Besi Hollow (Masuk dan keluar) Set 2.00
TOTAL BIAYA PEKERJAAN PAGAR
VII PEKERJAAN KANTIN (KONTAINER CUSTOM)
A Pek. Tanah
1 Standar Pek. Galian Tanah M3 4.35
2 Standar Pek. Buangan Bekas Galian M3 4.35
3 Standar Pek. Urugan Pasir M3 4.01
4 Standar Pek. Pemadatan Tanah M3 4.01
B Pek. Pondasi Umpak dan Lantai
1 Standar Pek. Pondasi Umpak Pasangan Batu Camp. 1 Pc : 5 Ps M3 0.51
2 Standar Pek. Lantai Beton (K175) M3 8.03
C Pek. Kontainer
1 Standar Pek. Kontainer uk. 20 Feet (4 Buah) Set 1.00
2 Standar Pek. Handrail Tangga (Pipa Galvanis 2") Set 1.00
3 Standar Pek. Partisi Kantin m2 30.80
4 Standar Pek. Pengecatan Partisi m2 61.60
5 Standar Pek. Secondary Skin (material kalsiboard) Set 1.00
6 Standar Pek. Rangka Besi Hollow uk. 4x8 (t = 1,5mm) Set 1.00
7 Standar Pek. Atap Bitumen + Rangka Baja Ringan 75.75 (Onduline Tile) m2 85.40
D Pek. Elektrikal
1 Standar Pek. Box Hager + MCB Unit 1.00
2 Standar Pek. Kabel Dari Sumber Ke MCB, NYY 4 x 2,5 mm2 M' 10.00
3 Standar Pek. Saklar Tunggal Unit 4.00
4 Standar Pek. Stop Kontak Unit 10.00
5 Standar Pek. Lampu Gantung Bh 10.00
6 Standar Lampu Baret Kotak 18 Watt Bh 8.00
7 Standar Pek. Instalasi, NYM 3 x 2,5 mm2 + Pipa Conduit Titik 28.00
E Pek. Utilitas
1 Standar Pompa Transfer + Aksesoris (Automatis) Unit 1.00
2 Standar Kitchen Zinc Stanless + Dudukan Unit 1.00
3 Standar Kran Air Kitchen Zink (Toto Type TX109LEM) Unit 1.00
4 Standar Pek. Instalasi Air Bersih Set 1.00
5 Standar Pek. Instalasi Air Bekas Set 1.00
TOTAL BIAYA PEKERJAAN KANTIN (KONTAINER CUSTOM)
RENCANA ANGGARAN BIAYA
PEKERJAAN FURNITURE DAN INTERIOR

Harga Satuan Total Harga Satuan Jumlah Harga


(Rp.) Overhead (Rp.) (Rp.)
No, Nama Barang/Item Satuan Volume
Harga Satuan Harga Satuan Jumlah Harga
10%
(Rp.) (Rp.) (Rp.)
1 2 3 4 5 6 = 10% x 5 5 7=4x(5+6)
A. FURNITURE AREA SEGMEN SGA (GEDUNG PELAYANAN)
A1. KOMPONEN MEJA DAN ETALASE
A1 MEJA PENGARAH LAYANAN Buah 1
A2 MEJA LOKET TPT Buah 5
A3 MEJA LAYANAN KONSULTASI Buah 4
A5 MEJA FORMULIR Buah 1
A6 MESIN ANTRIAN Buah 1
A6' LCD MONITOR TOUCH SCREEN (+Instalasi) Uk, 20 inch Unit 2
A6' PRINTER CETAK ANTRIAN Unit 2
A6' CPU Inter Core I5 Unit 2
A7 PAPAN PENGUMUMAN Buah 1
A8 KOMPONEN FASILITAS LAYANAN MANDIRI (+ Instalasi) Buah 1
A9 MEDIA INFORMASI DIGITAL (+ Instalasi) Buah 1
A10 TEMPAT KORAN & DISPENSER Buah 1
A11 MEJA BAR REST AREA Buah 1
A12 MODUL FIX BANNER Buah 4
A13 CHARGE STATION Buah 1
A14 PHOTO BOTH Buah 1
A2.KOMPONEN KURSI, SOFA, & AKSESORIES
A-26-1 SIGNAGE GABTUNG RESTROOM Buah 1
A-26-2 SIGNAGE DINDING RESTROOM Buah 1
A-29 JAM DINDING LOGO DJP (Custom) Buah 2
JUMLAH A
B. FURNITURE AREA SEGMEN SGS (GEDUNG STAFF)
B1. KOMPONEN MEJA DAN ETALASE
B4-A LOKER STAFF DUA SUSUN Buah 4
B4-B LOKER STAFF SATU SUSUN TIPE A Buah 2
B4-C LOKER STAFF SATU SUSUN TIPE B Buah 4
B4-D LOKER STAFF SATU SUSUN TIPE C Buah 1
B4-E LOKER STAFF SATU SUSUN TIPE D Buah 2
B6 CREDENZA PIMPINAN & RG. RAPAT Buah 2
B7 LEMARI PIMPINAN Buah 1
B10-A MEJA BACA PERPUSTAKAAN Buah 1
B13 LEMARI PERPUSTAKAAN Buah 1
B2. KOMPONEN KURSI, SOFA, & AKSESORIES
JUMLAH B
C. FURNITURE AREA SEGMEN SGA (GEDUNG AULA)
C1. KOMPONEN MEJA DAN ETALASE
C4 BUFFET AULA Buah 3
C5-A MEJA BAR PANTRY Buah 3
C6-A MEJA BAR KANTIN Buah 3
C9 RAK TV RG. INSPIRASI Buah 3
C2. KOMPONEN KURSI, SOFA, & AKSESORIES
JUMLAH C
JUMLAH HARGA PEKERJAAN FURNITURE (A+B+C)