Anda di halaman 1dari 19

REKAPITULASI AKHIR

NO URAIAN PEKERJAAN JUMLAH HARGA TOTAL

A GUDANG 3,134,094,336.43

I PEKERJAAN PENDAHULUAN 44,026,500.00


II PEKERJAAN TANAH DAN STRUKTUR BAWAH 587,739,431.26
III PEKERJAAN STRUKTUR TENGAH 1,226,929,756.65
IV PEKERJAAN ATAP, TALANG DAN LISTPLANK 413,328,194.44
V PEKERJAAN DINDING 219,702,366.98
VI PEKERJAAN PELAPIS DINDING 293,049,411.65
VII PEKERJAAN PENGECATAN 93,548,655.07
VIII PEKERJAAN KUSEN 31,743,363.75
IX PEKERJAAN PLUMBING 6,376,656.62
X PEKERJAAN LAIN-LAIN 175,650,000.00
XI PEKERJAAN MEKANIKAL ELEKTRIKAL 38,000,000.00
XII PEKERJAAN SISTEM PEMADAM KEBAKARAN 4,000,000.00
B PAGAR 528,083,515.62
C KANTOR 560,186,776.87
TOTAL 4,222,364,628.91
PPN 10% 422,236,462.89
PEMBULATAN 4,644,601,091.80
GRAND TOTAL 4,644,601,091.80
Empat Milyar Enam Ratus Empat Puluh Empat Juta Enam Ratus Satu Ribu Sembilan Puluh Satu Rupiah
Terbilang : Delapan Puluh Sen

Ambon, 16 September 2021

Penawar,
CV. KARYA PRATAMA

INDRA WIJAYANTI
Direktur
RENCANA ANGGARAN BIAYA
PA/KPA : Kepala Dinas Perindustrian,Perdagangan,Koperasi dan UMKM
K/L/D/I : Pemerintah Kabupaten Maluku Barat Daya
SKPD : Dinas Perindustrian,Perdagangan,Koperasi dan UMKM Kegiatan : Pembangunan Gudang Non SRG
Pekerjaan : Tugas Pembantuan Pembangunan Gudang Non SRG Provinsi : Maluku
Kabupaten : Maluku Barat Daya
Lokasi : Tiakur
Tahun Anggaran : 2021

PEMBANGUNAN GUDANG NON SRG


No URAIAN PEKERJAAN SAT. VOL. HARGA SATUAN JUMLAH TOTAL HARGA

I PEKERJAAN PENDAHULUAN
Pengukuran dan pemasangan bowplank ls 1 3,000,000.00 3,000,000.00
Pemasangan papan nama proyek ls 1 500,000.00 500,000.00
Sewa direksi keet / kantor sementara & gudang alat dan bahan m2 16 1,661,031.25 26,576,500.00

Biaya smk3 ls 1 13,950,000.00 13,950,000.00

Ke Penjumlahan Rp. 44,026,500.00


II PEKERJAAN TANAH DAN STRUKTUR BAWAH
II.1 PONDASI BATU BELAH
A. Pekerjaan batu belah
- galian pondasi batu belah,panjang 132 m kondisi tanah dengan kekerasan standart m3 23.23 119,312.50 2,771,629.38
- pondasi batu belah untuk bangunan utama pemasangan batu belah,camp 1:4 m3 34.84 1,323,075.00 46,090,640.70
- pondasi batu belah untuk selasar pemasangan batu belah,camp 1:4 m3 8.8 1,323,075.00 11,643,060.00
- urugan tanah untuk pondasi batu belah menggunakan tanah bekas 1/3 galian m3 7.74 89,125.00 690,124.58

II.2 STRUKTUR BAWAH


A. Pile cap
a pekerjaan galian dan tanah
- galian pile cap, jumlah 29 titik kondisi tanah dengan kekerasan standart m3 63.34 119,312.50 7,556,776.50
- urugan pasir pile cap,jumlah 29 titik pasir urug tebal 5cm dipadatkan m3 2.44 323,725.00 788,594.10
- lantai kerja pile cap,jumlah 29 titik site mix, tebal 5cm,K-150 m3 2.44 1,508,298.27 3,674,214.59
urugan tanah pile cap,jumlah 29 titik menggunakan tanah bekas 1/3 galian m3 21.11 251,562.50 5,310,987.50

b pekerjaan struktur pile cap


- beton pile cap, jumlah 29 titik Beton K-300, (1000 X 1200 X 500) m3 17.4 1,709,798.71 29,750,497.55
- pembesian pile cap,jumlah 29 titik tul. D19-130 kg 3,283.23 32,310.23 106,081,916.44
- bekesting pile cap,jumlah 29 titik multiplek 9mm rangka kaso m2 63.8 222,985.00 14,226,443.00

B. Sloof
- beton sloof,panjang 126,4 m Beton K-300, (150 X 350) m3 6.64 1,709,798.71 11,346,224.24
- pembesian sloof tul 6D12 + 4Ø10 + sengkang Ø8- kg 1,015.02 32,310.23 32,795,529.65
100(tump) & Ø8-150(lap)

- bekesting sloof multiplek 9mm rangka kaso m2 88.48 285,200.00 25,234,496.00

C. Beton K-300 :
- lantai parit site mix tebal 8mm m3 3.56 1,709,798.71 6,086,883.41
- rabat beton untuk lantai bangunan utama site mix tebal 8mm m3 53.76 1,709,798.71 91,918,778.65
- pembuatan floor ardiner floor ardiner untuk lantai bangunan m2 672 45,000.00 30,240,000.00
- rabat beton untuk lantai selasar site mix tebal 8mm m3 10.28 1,709,798.71 17,573,311.14
- rabat beton untuk lantai ramp site mix tebal 15mm m3 11.49 1,709,798.71 19,642,167.58

D. Peninggian elevasi
- tanah urug bawah lantai dalam bangunan mendatangkan tanah m3 450.24 251,562.50 113,263,500.00
- tanah urug bawah lantai selasar mendatangkan tanah m3 38.2 251,562.50 9,609,687.50
- tanah urug bawah lantai ramp mendatangkan tanah m3 5.74 251,562.50 1,443,968.75

Ke Penjumlahan Rp. 587,739,431.26


No URAIAN PEKERJAAN SAT. VOL. HARGA SATUAN JUMLAH TOTAL HARGA

III PEKERJAAN STRUKTUR TENGAH


III.1 PEKERJAAN STRUKTUR BETON
1 Pekerjaan kolom
a. Kolom Tipe (K1)
- tipe kolom (K1),jumlah 29 buah pedestal readymix K-300 250x350x1700 m3 4.31 1,709,798.71 7,369,232.44
- pembesian kolom (K1),jumlah 29 buah besi beton 12D16, sengkang Ø8-100 kg 1,395.05 32,310.23 45,074,386.36
- bekesting kolom (K1),jumlah 29 buah multiplek 9mm rangka kaso m2 59.16 488,098.23 28,875,891.29

b. Kolom Tipe (K2)


- tipe kolom (K2) ,jumlah 12 buah kolom sampai kedalaman pondasi readymix m3 2.05 1,659,318.00 3,404,920.54
K-250 150x300x3800

- pembesian kolom (K2),jumlah 12 buah besi beton 6Ø12, sengkang Ø8-15 kg 319.4 32,310.23 10,319,887.46
- bekesting kolom (K2),jumlah 12 buah multiplek 9mm rangka kaso m2 41.04 488,098.23 20,031,551.36

c. Kolom Tipe (KP)


- tipe kolom (KP) kolom 13x13 m3 8.51 102,292.56 870,509.69

2 Pekerjaan ring balok


- beton ring balok (15x30),panjang 155,2 m beton readymix K-250 150x300 m3 6.98 1,659,318.00 11,582,039.66
- pembesian ring balok,panjang 155,2 m besi beton 6Ø12, sengkang Ø8-100(tump) kg 1,224.73 32,310.23 39,571,307.99
& Ø8-150(lap)

- bekesting ring balok,panjang 155,2 m multiplek 9mm rangka kaso m2 93.12 488,098.23 45,451,707.02

III.2 PEKERJAAN STRUKTUR BAJA


a. Struktur utama
Kolom Struktur K1 Besi WF 300x150 kg 7,352.48 45,885.00 337,368,544.80
Kuda kuda baja Besi WF 300x150 kg 4,820.91 45,885.00 221,207,455.35
konsol teritisan Besi WF 200x100 kg 477.12 45,885.00 21,892,651.20
ring balok wf Besi WF 200x100 kg 2,460.15 45,885.00 112,883,982.75
gording kanal C Besi kanal C 125 kg 4,835.52 45,885.00 221,877,835.20

b. asesoris Struktur pendukung


Rip 1 (plat buhul) jumlah 16 buah plat besi tebal 10mm kg 25.59 45,885.00 1,174,197.15
Rip 2 (plat buhul) jumlah 16 buah plat besi tebal 8mm kg 8.74 45,885.00 401,034.90
Rip 3 (plat buhul) jumlah 16 buah potongan Besi WF 200x100 kg 42.6 45,885.00 1,954,701.00
Rip 4 (plat buhul) jumlah 16 buah plat besi tebal 10mm kg 6.28 45,885.00 288,157.80
Rip 5 (plat buhul) jumlah 16 buah potongan Besi WF 300x150 kg 180.77 45,885.00 8,294,631.45
endplate 1 plat besi tebal 16mm kg 175.84 45,885.00 8,068,418.40
endplate 2 plat besi tebal 10mm kg 97.21 45,885.00 4,460,480.85
angkur baut baut HTB M22 panjang 750mm bh 108 25,000.00 2,700,000.00
baut 19 baut HTB M19 bh 224 25,000.00 5,600,000.00
baut 16 baut HTB M16 bh 180 25,000.00 4,500,000.00
trackstank besi Ø10 lengkap dengan ulir kg 116.09 32,310.23 3,750,894.64
kait angin besi Ø16 lengkap dengan ulir dan pengunci kg 79 32,310.23 2,552,508.20

Dudukan Gording Besi siku 50 kg 110.4 45,885.00 5,065,704.00

c. Cat Baja Struktur utama


Pengecatan struktur utama baja menni besi ls 1 10,000,000.00 10,000,000.00

d. Cat Baja asesoris Struktur pendukung


Pengecatan aksesories menni besi ls 1 5,000,000.00 5,000,000.00

III.3 PEKERJAAN STRUKTUR BAJA RINGAN


kuda-kuda 1 baja ringan profil C 75mm termasuk assesoris mur
m2 dan pemasangan
16.78 333,528.75 5,596,612.43

kuda-kuda 2 baja ringan profil C 75mm termasuk assesoris mur


m2 dan pemasangan
9.14 333,528.75 3,047,785.72

kuda-kuda 3 baja ringan profil C 75mm termasuk assesoris mur


m2 dan pemasangan
48.07 333,528.75 16,032,727.01

gording baja ringan profil C 75mm termasuk assesoris mur


m1 dan pemasangan
533 20,000.00 10,660,000.00

Ke Penjumlahan Rp. 1,226,929,756.65


IV PEKERJAAN ATAP, TALANG DAN LISTPLANK
a. Penutup atap
atap utama Atap Alderon atau setara m2 988 300,000.00 296,400,000.00
atap sky light Atap type transparan Alderon atau setara m2 199.19 300,000.00 59,756,400.00
b. bubungan
nok atap utama nok Alderon/setara m1 58.8 100,400.00 5,903,520.00

c. Talang
rangka talang atap utama besi hollow 40x40 termasuk mesi besi ls 1 15,000,000.00 15,000,000.00
plat talang atap utama plat galvanis tebal 1,3mm termasuk asesoris mur ls 1 15,000,000.00 15,000,000.00

roof drain roof drain 4" merk onda/setara unit 8 100,000.00 800,000.00

d. Listplank
listplank atap teritisan GRC lebar 20cm panel GRC 9mm termasuk asesoris mur dan pemasangan
m1 35.98 30,000.00 1,079,400.00

listplank teritisan GRC lebar 15cm panel GRC 9mm termasuk asesoris mur dan pemasangan
m1 124 30,000.00 3,720,000.00

e Pemipaan
pemipaan dari talang ke saluran pipa pvc 3" m1 81.92 191,270.44 15,668,874.44

Ke Penjumlahan Rp. 413,328,194.44


No URAIAN PEKERJAAN SAT. VOL. HARGA SATUAN JUMLAH TOTAL HARGA

V PEKERJAAN DINDING

Pekerjaan dinding bata


dinding bata bangunan utama Adukan 1 PC : 4 PS, Bata merah m2 m2 933.34 224,796.25 209,811,331.98
dinding bata untuk saluran drinase Adukan 1 PC : 4 PS, Bata merah 44.00 224,796.25 9,891,035.00

Ke Penjumlahan Rp. 219,702,366.98


VI PEKERJAAN PELAPIS DINDING
a. Plaster aci

plesteran dinding bata bangunan utama Adukan 1 pc : 6 ps m2 m2 1,866.68 92,815.80 173,257,397.54


acian dinding bata bangunan utama 1,866.68 61,165.63 114,176,658.21

dinding untuk saluran drinase Adukan 1 pc : 6 ps m2 60.5 92,815.80 5,615,355.90

Ke Penjumlahan Rp. 293,049,411.65


VII PEKERJAAN PENGECATAN
a. Pengecatan bangunan

Pengecatan dinding bangunan utama cat tembok warna putih weathershield merk m2 m2 1,866.68 48,809.75 91,112,184.13
vinilex atau setara
cat tembok warna putih weathershield merk 20.65 48,809.75 1,007,921.34
Pengecatan listplank atap teritisan GRC lebar 15cm vinilex atau setara

Pengecatan listplank atap main gate GRC lebar 20cm cat tembok warna putih weathershield merk vinilex
m2 atau 8.78
setara 48,809.75 428,549.61

b. Pengecatan bidang besi


pengecatan teralis besi pengaman pipa air hujan cat duco warna hitam dof merk nipe atau ls ls 1.00 500,000.00 500,000.00
setara
cat minyak kuas warna hitam dof merk nipe 1.00 500,000.00 500,000.00
pengecatan besi klem pipa air hujan atau setara

Ke Penjumlahan Rp. 93,548,655.07


VIII PEKERJAAN KUSEN
Folding door harmonika lubang tanpa daun m2 38.85 817,075.00 31,743,363.75

Ke Penjumlahan Rp. 31,743,363.75


IX PEKERJAAN PLUMBING
Pengadaan + pemasangan pipa air bersih supplay ke kran pipa galvanis dia 1/2" lengkap dengan m1 unit 30.00 121,595.25 3,647,857.50
toilet asesoris Lbow dan knie
merk onda/setara lengkap dengan knie drat 2.00 168,963.75 337,927.50
Pengadaan + pemasangan kran dinding 1/2" dan selotip

Pengadaan + pemasangan washtafel merk INA/setara warna putih set 2 1,195,435.81 2,390,871.62

Ke Penjumlahan Rp. 6,376,656.62


X PEKERJAAN LAIN-LAIN
a. plat nama gudang (signage) tampak depan plat stainless steel press ls 1.00 10,000,000.00 10,000,000.00
plat stainless steel press ls 1.00 1,000,000.00 1,000,000.00
b. logo pasar rakyat (signage)
c. logo kementrian (signage) plat stainless steel press ls 1 1,000,000.00 1,000,000.00
d. logo kabupaten (signage) plat stainless steel press ls 1 1,000,000.00 1,000,000.00
e. Pekerjaan PJU PJU smart solarcell 40 watt lengkap+dudukan beton
bh PJU4 25,000,000.00 100,000,000.00
f. support gantung untuk pipa air hujan besi strip plat tebal 1mm dan besi beton ls 1 3,000,000.00 3,000,000.00
10mm

g. klem menempel dinding untuk pipa air hujan besi strip plat tebal 1mm ls 1 250,000.00 250,000.00
h. glass block bh 396 150,000.00 59,400,000.00

Ke Penjumlahan Rp. 175,650,000.00


XI XI.1 PEKERJAAN MEKANIKAL ELEKTRIKAL PEKERJAAN PANEL DISTRIBUSI

A PEKERJAAN PANEL
a. Pekerjaan Main Panel Distribusi (SDP1) untuk bangunan utama dan kantor

Box Panel plat 1,5mm fin. Cat warna abu-abu kulit jeruk (uk. 60x80 cm) lengkap dengan Bus-Bar, set 1.00 1,700,000.00 1,700,000.00
Ampere/Volt/Frekwensi meter, pilot lamp,
sekring, indikator lamp.
Merk ABB/ HAGER/setara unit 1.00 350,000.00 350,000.00
MCCB 40A , 3 phasa

b. Pekerjaan Main Panel Distribusi (SDP2) untuk lampu taman


Box Panel plat 1,5mm fin. Cat warna abu-abu kulit
jeruk (uk. 40x60 cm)
lengkap dengan Bus-Bar, set 1.00 1,700,000.00 1,700,000.00
Ampere/Volt/Frekwensi meter, pilot lamp,
sekring, indikator lamp.
Merk ABB/ HAGER/setara unit 1.00 500,000.00 500,000.00
MCCB 80A ,10KA, 3 phasa

B PEKERJAAN KABEL TROVOOR + ARDE &


a. Pekerjaan Kabel Trovoor

Pekerjaan Kabel Tovoor NYY 4 x 50 mm2 (Supreme/Kabelindo/Tranka/Kabelmetal/se tara),


m1dari
m1 KWH Meter
4.00 ke MDP
200,000.00 800,000.00

140.00 100,000.00 14,000,000.00


Pekerjaan Kabel Tovoor NYY 4 x 16 mm2 (Supreme/Kabelindo/Tranka/Kabelmetal/se tara), dari MDP Meter ke jaringan instalasi hydrant

b. Pekerjaan Grounding
Pekerjaan Grounding , nilai maksimal = 1 ohm Copper Rod Tembaga 1" (dari titik grounding ls 1 2,000,000.00 2,000,000.00
ke dalam tanah sampai ke dasar titik
pengeboran), Pentanahan + pipa Gip 1
1/2", Kabel BC 35 mm
(Supreme/Kabelindo/Tranka/Kabelmetal)
(dari panel sampai lokasi titik grounding)

No URAIAN PEKERJAAN SAT. VOL. HARGA SATUAN JUMLAH TOTAL HARGA

XI.2 PEKERJAAN INSTALASI


a. Instalasi penarikan kabel lampu dan stop kontak

Pengadaan + penarikan instalasi stop kontak normal kabel NYM 3x2,5 titik 2 50,000.00 100,000.00
(1 gang) (Supreme/Kabelindo/Tranka/Kabelmetal/se
tara) sqmm dengan protector PVC
Conduit National/Clipsal/EGA /setara

b. Pekerjaan Armature
Pengadaan + pasang armature lampu TL 1 lampu 18 watt (jenis day light) Armature ex. /PHILLIPS/PANASONIC/setara,
titik 7 200,000.00
Komponen Merk
1,400,000.00
PHILLIPS/OSRAM

Pengadaan + pasang armature lampu downlight lampu 18 watt (jenis day light) Armature ex. /PHILLIPS/PANASONIC/setara,
titik 4 250,000.00
Komponen Merk
1,000,000.00
PHILLIPS/OSRAM

Pengadaan + Pasang stop kontak 1 gang stop kontak child protection merk clipsal/setaratitik 2 25,000.00 50,000.00

XI.3 PEKERJAAN TATA UDARA


Pengadaan dan pemasangan ventilator 60 CM = Double Exhaust Fan, Double Bearing : SKF set 18 800,000.00 14,400,000.00
24’’/100 x 86 x 86 Full Stainless Steel,Made In Japan. Kapasitas
hisap 98,79 M³ / menit, 5 kipas baling dalam
bola, Konstruksi rangka
dalam bola dan topi bola di powder coating
Ke Penjumlahan Rp. 38,000,000.00
XII PEKERJAAN SISTEM PEMADAM KEBAKARAN
Pengadaan dan pemasangan fire extinguisher APAR 6kg Merk SERVO / CHUBB/setara unit 2 2,000,000.00 4,000,000.00
+ braket dinding

Ke Penjumlahan Rp. 4,000,000.00

TOTAL Rp 3,134,094,336.43
No URAIAN PEKERJAAN SAT. VOL. HARGA SATUAN JUMLAH TOTAL HARGA

XII PEKERJAAN PAGAR


XII PEKERJAAN TANAH DAN STRUKTUR BAWAH
XII.1 PEKERJAAN TANAH DAN PERSIAPAN
a. Pekerjaan persiapan
pembuatan bowplank ls 1 1,500,000.00 1,500,000.00

b. Pekerjaan tanah
galian tanah,panjang 188 m kondisi tanah dengan kekerasan standart m3 34.87 119,312.50 4,160,426.88
urugan tanah kembali menggunakan tanah bekas 1/3 galian m3 11.62 89,125.00 1,035,929.58
pondasi batu belah batu belah, camp 1:4 m3 51.14 1,323,075.00 67,656,763.20

Ke Penjumlahan Rp. 74,353,119.66


XII.2 STRUKTUR BAWAH
a. Sloof
Sloof 1, total panjang 50 m' pedestal readymix K-200 150x200x50000 m3 1.5 1,602,228.69 2,403,343.03

besi beton 4D10, sengkang Ø8-150 kg 190.48 32,310.23 6,154,452.61


multiplek 9mm rangka kaso m2 20 285,200.00 5,704,000.00
Sloof 2, total panjang 138 m' pedestal readymix K-200 m3 2.28 1,602,228.69 3,648,274.73
110x150x138000

besi beton 4D10, sengkang Ø8-150 kg 460.5 32,310.23 14,878,860.92


multiplek 9mm rangka kaso m2 41.4 285,200.00 11,807,280.00

Ke Penjumlahan Rp. 44,596,211.28


XII.3 PEKERJAAN STRUKTUR TENGAH
PEKERJAAN BETON
a. kolom
Tipe kolom (K1) jumlah 11 buah pedestal readymix K-200 200x200x2000 m3 0.88 1,602,228.69 1,409,961.25
besi beton 4D10, sengkang Ø8-150 kg 97.76 32,310.23 3,158,648.08
multiplek 9mm rangka kaso m2 17.6 488,098.23 8,590,528.85
Tipe kolom (K2) jumlah 104 buah pedestal readymix K-200 m3 3.51 1,602,228.69 5,623,822.70
150x150x1500x104

besi beton 4D10, sengkang Ø8-150 kg 630.43 32,310.23 20,369,273.68


multiplek 9mm rangka kaso m2 93.6 488,098.23 45,685,994.33
b. ring balok
ring balok (RB1) panjang 50 m pedestal readymix K-200 150x200x50000 m3 1.5 1,602,228.69 2,403,343.04

besi beton 4D10, sengkang Ø8-150 kg 190.48 32,310.23 6,154,452.61


multiplek 9mm rangka kaso m2 27.5 488,098.23 13,422,701.33
ring balok (RB2) panjang 21,9 m pedestal readymix K-200 m3 0.36 1,602,228.69 576,802.33
110x150x138000

besi beton 4D10, sengkang Ø8-150 kg 75.96 32,310.23 2,454,252.76


multiplek 9mm rangka kaso m2 8.98 488,098.23 4,382,634.01
c. list beton
list beton pagar ls 1 12,000,000.00 12,000,000.00

Ke Penjumlahan Rp. 126,232,414.95


XII.4 PEKERJAAN DINDING
Pekerjaan dinding bata
dinding bata pagar Adukan 1 PC : 4 PS, Bata merah m2 146.55 224,796.25 32,943,890.44

Ke Penjumlahan Rp. 32,943,890.44


XII.5 PEKERJAAN PELAPIS DINDING
a. Plasteran dan acian
plesteran dinding pagar Adukan 1 pc : 6 ps m2 293.1 92,815.80 27,204,310.98
acian dinding pagar m2 293.1 61,165.63 17,927,646.15
plesteran dinding pondasi pagar Adukan 1 pc : 6 ps m2 191.8 92,815.80 17,802,070.44
acian dinding pondasi pagar m2 191.8 61,165.63 11,731,567.83
b. Batu Alam
pelapis dinding batu alam batu candi warna m2 100.64 230,474.38 23,194,941.60
]
Ke Penjumlahan Rp. 97,860,537.01
XII.6 PEKERJAAN ALLUMINIUM
a. pembuatan besi pagar besi hollow 40x40 m1 250 35,000.00 8,750,000.00
besi hollow 20x40 m1 1,084.72 27,825.00 30,182,334.00
besi plat tebal 10 mm kg 48.22 45,885.00 2,212,574.70
grill pagar bh 8 100,000.00 800,000.00
grendel besi bh 2 20,000.00 40,000.00

Ke Penjumlahan Rp. 41,984,908.70


XII.7 PEKERJAAN PENGECATAN
a. Pengecatan dinding
Pengecatan dinding pagar + pondasi dan kolom cat tembok warna weathershield merk vinilex atau
m2 setara596.73 48,809.75 29,126,242.12

a. Pengecatan besi pagar


Pengecatan besi pagar cat dengan menni besi ls 1 10,000,000.00 10,000,000.00

Ke Penjumlahan Rp. 39,126,242.12


No URAIAN PEKERJAAN SAT. VOL. HARGA SATUAN JUMLAH TOTAL HARGA

XII.8 PEKERJAAN INSTALASI


a. Instalasi penarikan kabel lampu dan stop kontak

Pengadaan + penarikan instalasi penerangan dengan kabel NYM 3x2,5 sqmm (Supreme/Kabelindo/Tranka/Kabelmetal/se
titik 73 128,030.02
tara) dengan protector
9,346,191.46
PVC Conduit National/Clipsal/EGA/setara

Pengadaan + penarikan instalasi saklar kabel NYM 3x2,5 titik 2 50,000.00 100,000.00
(Supreme/Kabelindo/Tranka/Kabelmetal/se
tara) sqmm dengan protector PVC
Conduit National/Clipsal/EGA /setara

b. Pekerjaan Armature
Pengadaan + pasang armature lampu dinding lampu 18 watt (jenis day light) Armature ex. /PHILLIPS/PANASONIC/setara,
titik 73 500,000.00
Komponen Merk
36,500,000.00
PHILLIPS/OSRAM

Pengadaan + Pasang saklar tunggal saklar tunggal merk clipsal/setara titik 2 20,000.00 40,000.00

Ke Penjumlahan Rp. 45,986,191.46


XII.9 PEKERJAAN LAIN-LAIN
biaya pengelasan ls 1 25,000,000.00 25,000,000.00

Ke Penjumlahan Rp. 25,000,000.00

TOTAL XVI Rp 528,083,515.62


No URAIAN PEKERJAAN SAT. VOL. HARGA SATUAN JUMLAH TOTAL HARGA

XIII PEKERJAAN KANTOR


XIII PEKERJAAN TANAH DAN STRUKTUR BAWAH
XIII.1 PEKERJAAN TANAH DAN PERSIAPAN
a. Pekerjaan persiapan
pembuatan bowplank ls 1 1,500,000.00 1,500,000.00

b. Pekerjaan tanah
galian tanah,panjang 79,5 m kondisi tanah dengan kekerasan standart m3 26.71 119,312.50 3,186,836.88
urugan tanah kembali menggunakan tanah bekas 1/3 galian m3 8.9 89,125.00 793,509.58
urugan tanah bawah lantai mendatangkan tanah m3 26.98 251,562.50 6,785,898.44
pasir urug bawah lantai pasir urug, tebal 5cm dipadatkan m3 5.53 323,725.00 1,788,580.63
pondasi batu belah batu belah, camp 1:4 m3 14.01 1,323,075.00 18,536,280.75
pondasi batu kosong/anstamping batu belah, camp 1:4 m3 7.16 974,797.50 6,974,676.11

Ke Penjumlahan Rp. 39,565,782.38


XIII.2 STRUKTUR BAWAH
a. sloof
Sloof , total panjang 71 m' pedestal readymix K-200 110x170x71000 m3 1.33 1,602,228.69 2,126,157.47
besi beton 4D10, sengkang Ø8-150 kg 244.4 32,310.23 7,896,490.97
multiplek 9mm rangka kaso m2 24.14 285,200.00 6,884,728.00
b. Beton K-175 :
Rabat beton untuk lantai site mix tebal 5mm m3 5.53 1,556,475.09 8,599,524.87
Ke Penjumlahan Rp. 25,506,901.31
XIII.3 PEKERJAAN STRUKTUR TENGAH
PEKERJAAN BETON
a. kolom
Tipe kolom (K1) jumlah 5 buah pedestal readymix K-200 150x300x3520 m3 0.79 1,602,228.69 1,268,965.12
besi beton 6D10, sengkang Ø8-100 kg 114.51 32,310.23 3,699,844.44
multiplek 9mm rangka kaso m2 7.92 488,098.23 3,865,737.98
Tipe kolom (K2) jumlah 20 buah pedestal readymix K-200 150x150 m3 1.76 1,602,228.69 2,819,922.49
besi beton 4D10, sengkang Ø8-100 kg 319.8 32,310.23 10,332,746.93
multiplek 9mm rangka kaso m2 46.94 488,098.23 22,911,330.92

b. ring balok
Tipe ring balok (RB1) panjang 92,83m pedestal readymix K-200 m3 1.74 1,602,228.69 2,779,866.78
besi beton 4D10, sengkang Ø8-150 kg 319.54 32,310.23 10,324,410.89
multiplek 9mm rangka kaso m2 41.77 488,098.23 20,387,374.97

c. Plat beton
plat beton atap beton readymix K-200 tebal 10mm m3 1.31 1,602,228.69 2,095,715.13
besi wiremesh M6 kg 41.29 32,310.23 1,334,089.40
multiplek 9mm rangka kaso m2 13.09 511,098.23 6,687,720.34
plat meja beton beton readymix K-200 tebal 8mm m3 0.15 1,602,228.69 240,334.30
besi wiremesh M6 kg 5.59 32,310.23 180,614.19
multiplek 9mm rangka kaso m2 1.89 511,098.23 965,975.65

Ke Penjumlahan Rp. 89,894,649.53


XIII.4 PEKERJAAN ATAP DAN KAYU
a. kuda-kuda
kuda-kuda kayu kayu klas I,uk 5/11 m3 0.46 13,743,650.00 6,322,079.00
baut 16 bh 20 25,000.00 500,000.00

b. gording
gording kayu klas II,5/7 m3 0.4 10,158,812.50 4,053,366.19

c penutup atap spandek


atap spandek atap spandek m2 111.38 70,000.00 7,796,250.00

Ke Penjumlahan Rp. 18,671,695.19


XIII.5 PEKERJAAN DINDING
Pekerjaan dinding bata
dinding bata bangunan utama Adukan 1 PC : 4 PS, Bata merah m2 187.13 224,796.25 42,065,672.67

Ke Penjumlahan Rp. 42,065,672.67


XIII.6 PEKERJAAN PELAPIS DINDING
a. Plasteran dan acian
plesteran dinding bangunan Adukan 1 pc : 6 ps m2 417.46 92,815.80 38,746,512.60
acian dinding bangunan m2 417.46 61,165.63 25,534,203.90

Ke Penjumlahan Rp. 64,280,716.50


XIII.7 PEKERJAAN PELAPIS LANTAI DAN DINDING
a. Granite Lantai
granite granite 60x60 warna merk asia tile atau setara m2 83.14 631,062.50 52,466,536.25

keramik anti slip keramik 40x40 anti slip merk asia tile atau setara
m2 20.08 344,519.88 6,917,959.19

keramik meja beton keramik 40x40 warna merk asia tile atau setara m2 1.89 344,519.88 651,142.57

b. Keramik dinding
Keramik dinding mck keramik 40x40 warna merk asia tile atau setara m2 17.76 405,978.75 7,210,182.60

Keramik dinding dapur keramik 40x40 warna merk asia tile atau setara m2 4.5 405,978.75 1,826,904.38

c. Batu Alam
batu alam candi batu candi warna m2 51.86 230,474.38 11,952,401.35

Ke Penjumlahan Rp. 81,025,126.34


No URAIAN PEKERJAAN SAT. VOL. HARGA SATUAN JUMLAH TOTAL HARGA

XIII.8 PEKERJAAN PENGECATAN


a. Pengecatan bangunan
Pengecatan dinding bangunan cat tembok warna weathershield merk vinilex atau
m2 setara365.6 48,809.75 17,844,649.36

Pengecatan plafond cat tembok warna weathershield merk vinilex atau


m2 setara107.36 48,809.75 5,239,970.71

Ke Penjumlahan Rp. 23,084,620.07


XIII.9 PEKERJAAN KUSEN
jendela 1 (j1) kusen aluminium natural 4" m1 24.8 129,127.75 3,202,368.20
kaca naco 5mm m2 5 211,228.32 1,056,141.60
daun jendela aluminium strip lebar 8 cm m2 0.55 411,987.50 225,357.16
jendela 2 (j2) kusen aluminium natural 4" m1 47.64 129,127.75 6,151,646.01
kaca naco 5mm m2 8.6 211,228.32 1,815,507.41
daun jendela aluminium strip lebar 8 cm m2 1.64 411,987.50 676,071.49
jendela 3 (j3) kaca bening 12mm m2 4.37 500,000.00 2,185,000.00
jendela 4 (j4) kaca bening 12mm m2 3.68 500,000.00 1,840,000.00
jendela 5 (j5) kaca bening 12mm m2 2.76 500,000.00 1,380,000.00
kusen pintu panel (Kpp) kayu klas I,uk 5/11 m3 0.2 15,986,437.50 3,181,301.06
daun pintu panel kayu papan klas I m2 12.18 1,247,750.00 15,197,595.00

Ke Penjumlahan Rp. 36,910,987.93


XIII.10 PEKERJAAN KUNCI, ENGSEL DAN ASESORIS KUSEN
jendela 1 (j1) grendel unit 2 20,000.00 40,000.00
engsel kupu unit 4 40,738.75 162,955.00
kait angin unit 4 54,567.50 218,270.00
jendela 2 (j2) grendel unit 6 20,000.00 120,000.00
engsel kupu unit 12 40,738.75 488,865.00
kait angin unit 12 54,567.50 654,810.00
kusen pintu panel (Kpp) kunci slot tanam merk solid atau setara unit 7 206,664.55 1,446,651.85
engsel kupu unit 21 58,247.50 1,223,197.50
handle pintu merk solid atau setara unit 14 150,000.00 2,100,000.00

Ke Penjumlahan Rp. 6,454,749.35


XIII.11 PEKERJAAN PLAFOND DAN LANGT-LANGIT
a. Pekerjaan plafond
penutup plafond pentup plafond gypsumboard m2 107.36 73,329.71 7,872,311.02
rangka plafond rangka plafond, rangka hollow 4/4 dan 2/4 m2 107.36 335,225.00 35,988,079.88

Ke Penjumlahan Rp. 43,860,390.89


XIII.12 PEKERJAAN INSTALASI
a. Instalasi penarikan kabel lampu dan stop kontak

Pengadaan + penarikan instalasi penerangan Down dengan kabel NYM 3x2,5 sqmm (Supreme/Kabelindo/Tranka/Kabelmetal/se
titik 12 128,030.02
tara) dengan protector
1,536,360.24
PVC Conduit National/Clipsal/EGA/setara
Light.

Pengadaan + penarikan instalasi saklar kabel NYM 3x2,5 titik 8 50,000.00 400,000.00
(Supreme/Kabelindo/Tranka/Kabelmetal/se
tara) sqmm dengan protector PVC
Conduit National/Clipsal/EGA /setara

Pengadaan + penarikan instalasi stop kontak kabel NYM 3x2,5 titik 9 50,000.00 450,000.00
(Supreme/Kabelindo/Tranka/Kabelmetal/se
tara) sqmm dengan protector PVC
Conduit National/Clipsal/EGA /setara

b. Pekerjaan Armature
Pengadaan + pasang armature lampu downlight lampu 18 watt (jenis day light) Armature ex. /PHILLIPS/PANASONIC/setara,
titik 12 128,030.02
Komponen Merk
1,536,360.24
PHILLIPS/OSRAM

Pengadaan + Pasang saklar tunggal saklar tunggal merk panasonic/setara titik 5 20,000.00 100,000.00
Pengadaan + Pasang saklar ganda saklar ganda merk panasonic/setara titik 3 35,000.00 105,000.00
Pengadaan + Pasang stop kontak stop kontak merk panasonic/setara titik 9 20,000.00 180,000.00

Ke Penjumlahan Rp. 4,307,720.48


No URAIAN PEKERJAAN SAT. VOL. HARGA SATUAN JUMLAH TOTAL HARGA

XIII.13 PEKERJAAN PLUMBING


a. Pekerjaan plumbing air bersih
Pengadaan + pemasangan pipa air bersih supplay ke kran dapur pipa PVC dia. 1/2" ex.Wavin/Rucika/Vinilon/Paralon
m1 AW/setara
6 lengkap
27,850.05
dengan Lbow dan knie
167,100.30

Pengadaan + pemasangan pipa air bersih supplay ke kran toiletpipa galvanis dia 1/2" lengkap dengan asesoris Lbow
m1 dan24knie 121,595.25 2,918,286.00

Pengadaan + pemasangan kran dinding 1/2" merk onda/setara lengkap dengan knie drat dan unit
selotip 4 168,963.75 675,855.00

Pengadaan + pemasangan washtafel merk INA/setara warna putih set 1 1,195,435.81 1,195,435.81

b. Pekerjaan plumbing air kotor


Pengadaan + pemasangan pipa air kotor toilet pipa PVC dia. 2" ex.Wavin/Rucika/Vinilon/Paralon
m1 AW/setara
6 lengkap 102,058.76
dengan Lbow dan knie612,352.56

Pengadaan + pemasangan floor drain bahan stainless steel 3" merk onda/setara set 5 137,335.53 686,677.65

c. Pekerjaan plumbing air kotoran


Pengadaan + pemasangan pipa air kotoran dari closet ke septictank
pipa PVC dia. 4" ex.Wavin/Rucika/Vinilon/Paralon
m1 AW/setara
6 lengkap 266,325.63
dengan Lbow dan knie1,597,953.78

Pengadaan + pemasangan pipa udara pada septictank pipa PVC dia. 2" ex.Wavin/Rucika/Vinilon/Paralon
m1 AW/setara
1.2 lengkap 102,058.76
dengan Lbow dan knie122,470.51

Pengadaan + pemasangan pipa peresapan pada septictank pipa PVC dia. 3" ex.Wavin/Rucika/Vinilon/Paralon
m1 AW/setara
2 lengkap 191,270.44
dengan Lbow dan knie382,540.88

Pengadaan + pemasangan closet jongkok merk ina/setara unit 2 970,667.71 1,941,335.42

d. Pekerjaan plumbing air hujan


Pengadaan + pemasangan pipa air hujan pipa PVC dia. 4" ex.Wavin/Rucika/Vinilon/Paralon
m1 AW/setara
10 lengkap 266,325.63
dengan Lbow dan knie2,663,256.30

bak kontrol parit 40x40 dinding bata dengan penutup beton tebal unit 2 300,000.00 600,000.00
80mm

Ke Penjumlahan Rp. 13,563,264.21


XIII.14 PEKERJAAN LAIN-LAIN
a pembuatan septitank Kantor ls 1 7,500,000.00 7,500,000.00
b glass block bh 6 150,000.00 900,000.00
c pembuatan menara air besi galvanis 2" ls 1 7,500,000.00 7,500,000.00
d pengadaan profil tank profil tank 2200 liter,warna biru bh 1 5,500,000.00 5,500,000.00
e. pembuatan list atap ( plat stainless stel pres/ACP ) plat stainless steel pres ( ACP ) + besi hollow dan
m2besi siku
66.13 750,000.00 49,594,500.00

Ke Penjumlahan Rp. 70,994,500.00

TOTAL XVI Rp 560,186,776.87


BIAYA PENYELENGGARAAN SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA (SMK3)
KONSTRUKSI BIDANG PEKERJAAN GEDUNG
NO URAIAN SAT VOL HARGA SATUAN TOTAL HARGA KET

1 Sosialissi dan Promosi K3 terdiri atas :


Papan Informasi K3 Bh 1 500,000.00 500,000.00

2 Alat Pelindung Diri


a Pelindung Pernafasan dan Mulut (Masker) Bh 30 20,000.00 600,000.00
b Sarung Tangan (Safety Gloves) Psg 30 20,000.00 600,000.00
c Sepatu boat Psg 30 150,000.00 4,500,000.00
d Rompi Keselamatan (Safety Vest) Bh 30 100,000.00 3,000,000.00
e Helm Keselamatan Bh 30 100,000.00 3,000,000.00

3 Fasilitas Sarana kesehatan


Peralatan P3K (Kotak P3K, Tandu, Tabung Ls 1.00 1,000,000.00 1,000,000.00
Oksigen, Obat Luka, Perban, dll)

4 Rambu-Rambu terdiri atas :


a Rambu Petunjuk Bh 1 250,000.00 250,000.00
b Rambu larangan Bh 1 250,000.00 250,000.00
c Rambu Peringatan Bh 1 250,000.00 250,000.00

5 Lain-lain terkait Pengendalian Risiko K3


a Bendera K3 Bh 1 -
b Pelaporan dan Penyelidikan Insiden Ls 1 -

TOTAL 13,950,000.00