REKAPITULASI BIAYA

Kegiatan : Pembuatan Jaringan Perpipaan di Kawasan Perkotaan. (Otsus Block Grand).

Pekerjaan : Perencanaan Teknik Jaringan Perpipaan di Kawasan Perkotaan. (Otsus Block Grand).

Lokasi : Kabupaten Nduga


Waktu : 2,0 Bulan
T. Anggaran : 2022

TOTAL BIAYA
NO. URAIAN
(Rp)

I BIAYA LANGSUNG PERSONIL 243,296,900.00

II BIAYA LANGSUNG NON PERSONIL 81,070,000.00

JUMLAH 324,366,900.00

PPN 11 % 35,680,359.00

TOTAL 360,047,259.00

DIBULATKAN 360,000,000.00

TERBILANG : Tiga Ratus Enam Puluh Juta Rupiah,-


KEGIATAN PEMBUATAN JARINGAN PERPIPAAN DI KAWASN PERKOTAAN
PEK. PERENCANAAN TEKNIK JARINGAN PERPIPAAN DI KAWASAN PERKOTAAN (OTSUS BLOCK GRAND)
TAHUN ANGGARAN 2022

I. RINCIAN BIAYA LANGSUNG PERSONIL

Man
No. UraIan Satuan Jumlah Harga Satuan Harga Total
Month

A TENAGA AHLI

1 Team Leader (Pengalaman min. 5 thn) OB 1.00 2.00 @Rp. 28,979,050.00 Rp 57,958,100.00
2 Surveyor Engineer (Pengalaman min. 3 thn) OB 1.00 2.00 @Rp. 25,879,050.00 Rp 51,758,100.00
3 Cost Estimator (Pengalaman min. 3 thn) OB 1.00 2.00 @Rp. 25,879,050.00 Rp 51,758,100.00

Total Biaya Profesional Staf Rp 161,474,300.00


B ASISTEN TENAGA AHLI

1 Surveyor OB 1.00 2.00 @Rp. 12,969,000.00 Rp 25,938,000.00

Total Biaya Asisten Tenaga Ahli Rp 25,938,000.00

C TENAGA PENDUKUNG

1 Sekretaris / Administrasi OB 1.00 2.00 @Rp. 8,724,600.00 Rp 17,449,200.00


2 Operator Komputer OB 1.00 2.00 @Rp. 7,840,350.00 Rp 15,680,700.00
3 Supir OB 1.00 2.00 @Rp. 6,130,800.00 Rp 12,261,600.00
4 Tenaga Lokal OB 1.00 2.00 @Rp. 5,246,550.00 Rp 10,493,100.00

Total Biaya Tenaga Pendukung Rp 55,884,600.00


Total Biaya Langsung Personil Rp 243,296,900.00
II. RINCIAN BIAYA LANGSUNG NON PERSONIL
Man
No. Uraian Satuan Jumlah Harga Satuan Harga Total
Month
1 2 3 4 5 6 7

A BIAYA AKOMODASI

1 Mess Unit 1.00 2.00 @Rp. 15,000,000.00 Rp 30,000,000.00


2 Sewa Kendaraan Roda 4 Unit 1.00 2.00 @Rp. 10,000,000.00 Rp 20,000,000.00
3 Sewa Kendaraan Roda 2 Unit 2.00 2.00 @Rp. 2,500,000.00 Rp 10,000,000.00

Total Biaya Akomodasi Rp 60,000,000.00

B BIAYA PERALATAN TEKNIK DAN BAHAN

1 Komputer Desk Top Unit 1.00 2.00 @Rp. 1,000,000.00 Rp 2,000,000.00


2 Komputer Lap Top Unit 1.00 2.00 @Rp. 1,000,000.00 Rp 2,000,000.00
3 Printer Warna A4 Unit 1.00 2.00 @Rp. 500,000.00 Rp 1,000,000.00
4 Printer Warna A3 Unit 1.00 2.00 @Rp. 900,000.00 Rp 1,800,000.00
5 Foto Copy / ATK Ls 1.00 2.00 @Rp. 1,000,000.00 Rp 2,000,000.00
6 Alat Ukur (Water Pass) Unit 1.00 2.00 @Rp. 2,850,000.00 Rp 5,700,000.00
7 Kamera Digital Bh 1.00 2.00 @Rp. 300,000.00 Rp 600,000.00
8 Meter Rol Bh 1.00 2.00 @Rp. 197,500.00 Rp 395,000.00

Total Biaya Peralatan Teknik dan Bahan Rp 15,495,000.00

C BIAYA PELAPORAN

Intensitas
No. Uraian Satuan Jumlah Harga Satuan Harga Total

1 Dokumentasi Album 1.00 1.00 @Rp. 1,000,000.00 Rp 1,000,000.00


2 Laporan Pendahuluan Buku 3.00 1.00 @Rp. 250,000.00 Rp 750,000.00
3 Laporan Antara Buku 3.00 1.00 @Rp. 225,000.00 Rp 675,000.00
4 Laporan Akhir, meliputi
a. Laporan Perhitungan Design Buku 3.00 1.00 @Rp. 250,000.00 Rp 750,000.00
b. Gambar-gambar Rencana Buku 3.00 1.00 @Rp. 300,000.00 Rp 900,000.00
c. Kerangka Acuan Kerja Buku 3.00 1.00 @Rp. 250,000.00 Rp 750,000.00
d. RAB dan Analisa Harga Satuan Buku 3.00 1.00 @Rp. 250,000.00 Rp 750,000.00

Total Biaya Pelaporan Rp 5,575,000.00


Total Biaya Langsung Non Personil Rp 81,070,000.00
DAFTAR BEBAN BIAYA PERSONIL
PEKERJAAN JASA KONSULTAN PERENCANAAN TEKNIK
PEMBANGUNAN JARINGAN PERPIPAAN DI KAWASAN PERKOTAAN (OTSUS BLOCK GRAND)
DI KABUPATEN NDUGA

A. BIAYA TENAGA AHLI DENGAN SKK/SKA

Lamanya Gaji Dasar Index Biaya


Pengalaman (GD) Langsung Total Biaya
No. Kualifikasi Tenaga Ahli Keahlian Personil Langsung Personil
S1/Setara
(Thn) (IBLP) (Rp.)
(Rp) Prov. Papua
1 2 3 4 5 6=4x5
1 1 21,950,000.00 1.179 25,879,050.00
AHLI MUDA
2 2 23,500,000.00 1.179 27,706,500.00
3 1 3 25,050,000.00 1.179 29,533,950.00
4 AHLI MADYA 2 4 26,600,000.00 1.179 31,361,400.00
5 3 5 28,150,000.00 1.179 33,188,850.00
6 1 4 6 29,650,000.00 1.179 34,957,350.00
7 2 5 7 31,200,000.00 1.179 36,784,800.00
8 3 6 8 32,750,000.00 1.179 38,612,250.00
9 4 7 9 34,300,000.00 1.179 40,439,700.00
10 5 8 10 35,850,000.00 1.179 42,267,150.00
11 6 9 11 37,350,000.00 1.179 44,035,650.00
12 7 10 12 38,900,000.00 1.179 45,863,100.00
13 8 11 13 40,450,000.00 1.179 47,690,550.00
14 9 12 14 42,000,000.00 1.179 49,518,000.00
15 10 13 15 43,550,000.00 1.179 51,345,450.00
AHLI UTAMA
16 11 14 16 45,050,000.00 1.179 53,113,950.00
17 12 15 17 46,600,000.00 1.179 54,941,400.00
18 13 16 18 48,150,000.00 1.179 56,768,850.00
19 14 17 19 49,700,000.00 1.179 58,596,300.00
20 15 18 20 51,250,000.00 1.179 60,423,750.00
21 16 19 21 52,750,000.00 1.179 62,192,250.00
22 17 20 22 54,300,000.00 1.179 64,019,700.00
23 18 21 23 55,850,000.00 1.179 65,847,150.00
24 19 22 24 57,400,000.00 1.179 67,674,600.00
25 20 23 25 58,950,000.00 1.179 69,502,050.00
Catatan : Disadur dari Lampiran Surat Keputusan DPN INKINDO

Nomor : 22/SK.DPN/2021

Tentang : Peddoman Standar Remunerasi /Biaya Personil (Billing Rate) dan Biaya Langsung (Direct Cost)Untuk Badan Usaha Jasa Konsultansi Konstruksi
B. BIAYA TENAGA AHLI TANPA SKK/SKA

Index Biaya
TENAGA AHLINTANPA SKK / SKA Langsung Personil S1 / SETARA S2 / SETARA S3 / SETARA
DAN TAHUN PENGALAMAN Provinsi Papua

1 1.179 **) 26,600,000.00 40,675,500.00


2 - **) 28,500,000.00 42,675,500.00
3 1.179 25,879,050.00 30,400,000.00 44,675,500.00
4 - 27,429,050.00 32,300,000.00 46,675,500.00
5 - 28,979,050.00 34,200,000.00 48,675,500.00
6 - 30,529,050.00 36,100,000.00 50,675,500.00
7 - 32,079,050.00 38,000,000.00 52,675,500.00
8 - 33,629,050.00 39,900,000.00 54,675,500.00
9 - 35,179,050.00 41,800,000.00 56,675,500.00
10 - 36,729,050.00 43,700,000.00 58,675,500.00
11 - 38,279,050.00 45,600,000.00 60,675,500.00
12 - 39,829,050.00 47,500,000.00 62,675,500.00
13 - 41,379,050.00 49,400,000.00 64,675,500.00
14 - 42,929,050.00 51,300,000.00 66,675,500.00
15 - 44,479,050.00 53,200,000.00 68,675,500.00
16 - 46,029,050.00 55,100,000.00 70,675,500.00
17 - 47,579,050.00 57,000,000.00 72,675,500.00
18 - 49,129,050.00 58,900,000.00 74,675,500.00
19 - 50,679,050.00 60,800,000.00 76,675,500.00
20 - 52,229,050.00 62,700,000.00 78,675,500.00

Catatan : Disadur dari Lampiran Surat Keputusan DPN INKINDO

Nomor : 22/SK.DPN/2021

Tentang : Peddoman Standar Remunerasi /Biaya Personil (Billing Rate) dan Biaya Langsung (Direct Cost)Untuk Badan Usaha Jasa Konsultansi Konstruksi
C. BIAYA TENAGA SUB PROFESIONAL

Index Biaya
Langsung Remunerasi / Biaya Personil
No. Personil Personil ( Rupiah / Bulan )
(IBLP)
Prov. Papua
1 2 3 4 5=3x4

1 Asisten Ahli / (Sub Profesional Staff ) 1.179 13,950,000.00 16,447,050.00


2 Operator Cad / Cam 1.179 11,650,000.00 13,735,350.00
3 Operatoar Sig 1.179 11,650,000.00 13,735,350.00
4 Pemrogram Perangkat Lunak 1.179 13,950,000.00 16,447,050.00
5 Pemrogram Basis Data 1.179 13,950,000.00 16,447,050.00
6 Operator Basis Data 1.179 13,500,000.00 15,916,500.00
7 Pemeliharaan Sistem 1.179 13,500,000.00 15,916,500.00
8 Teknisi Jaringan Teknologi Informasi 1.179 13,500,000.00 15,916,500.00
9 Administrasi Web 1.179 13,500,000.00 15,916,500.00
10 Desain Grafis 1.179 13,950,000.00 16,447,050.00
11 Teknisi Perangkat Keras 1.179 11,650,000.00 13,735,350.00
12 Fasilitator 1.179 11,650,000.00 13,735,350.00
13 Teknisi Khusus / Inspektur Khusus 1.179 13,500,000.00 15,916,500.00
14 Teknisi 1.179 11,650,000.00 13,735,350.00
15 Inspektur 1.179 11,650,000.00 13,735,350.00
16 Surveyor 1.179 11,000,000.00 12,969,000.00

Catatan : Disadur dari Lampiran Surat Keputusan DPN INKINDO

Nomor : 22/SK.DPN/2021

Tentang : Peddoman Standar Remunerasi /Biaya Personil (Billing Rate) dan Biaya Langsung (Direct Cost)Untuk Badan Usaha Jasa Konsultansi Konstruksi
D. BIAYA TENAGA PENDUKUNG

Index Biaya
Gaji Dasar Langsung Total Biaya
No. Personil (GD) Personil Langsung Personil
(1 x GD) (IBLP) (Rp.)
(Rp) Prov. Papua
1 2 3 4 5=3x4

1 Manager Kantor 11,650,000.00 1.179 13,735,350.00


2 Manager Kantor Lapangan / Adm. 10,600,000.00 1.179 12,497,400.00
3 Sekretaris Dwibahasa 11,500,000.00 1.179 13,558,500.00
4 Sekretaris 7,400,000.00 1.179 8,724,600.00
5 Operator Komputer 6,650,000.00 1.179 7,840,350.00
6 Pengemudi 5,200,000.00 1.179 6,130,800.00
7 Kurir 4,650,000.00 1.179 5,482,350.00
8 Satpam 4,650,000.00 1.179 5,482,350.00
9 Pesuruh Kantor 4,450,000.00 1.179 5,246,550.00

Catatan : Disadur dari Lampiran Surat Keputusan DPN INKINDO

Nomor : 22/SK.DPN/2021

Tentang : Peddoman Standar Remunerasi /Biaya Personil (Billing Rate) dan Biaya Langsung (Direct Cost)Untuk Badan Usaha Jasa Konsultansi Konstruksi
KEGIATAN PEMBUATAN JARINGAN PERPIPAAN DI KAWASN PERKOTAAN
PEK. PERENC. TEKNIK JARINGAN PERPIPAAN DI KAWASAN PERKOTAAN (OTSUS BLOCK GRAND)
TAHUN ANGGARAN 2022

ANALISA HARGA SATUAN

1. SEWA MESS PROFESIONAL STAF/TEKNISI

HARGA / BIAYA
NO PERIHAL SATUAN
(Rp)

SEWA MESS Bulan

Rencana Lokasi Kenyam

1 Sewa Mess 1.00 12,500,000.00

2 Pemeliharaan 1.00 2,500,000.00

JUMLAH 15,000,000.00
KEGIATAN PEMBUATAN JARINGAN PERPIPAAN DI KAWASN PERKOTAAN

PEK. PERENC. TEKNIK JARINGAN PERPIPAAN DI KAWASAN PERKOTAAN (OTSUS BLOCK GRAND)
TAHUN ANGGARAN 2022

ANALISA HARGA SATUAN

2. CAR RENTAL

HARGA / BIAYA
NO PERIHAL SATUAN
(Rp)

SEWA MOBIL Bulan

Rencana Lokasi Timika

1 Jenis / Merk = Toyota Rush 1 6,000,000.00

2 Operasional dan Pemeliharaan 1 4,000,000.00

JUMLAH 10,000,000.00
KEGIATAN PEMBUATAN JARINGAN PERPIPAAN DI KAWASN PERKOTAAN
PEK. PERENC. TEKNIK JARINGAN PERPIPAAN DI KAWASAN PERKOTAAN (OTSUS BLOCK GRAND)
TAHUN ANGGARAN 2022

ANALISA HARGA SATUAN

3. MOTOR CYCLE RENTAL

NO PERIHAL SATUAN

SEWA MOTOR Bulan

Rencana Sewa Timika

1 Jenis / Merk = Suzuki / Honda 1

2 Operasional dan Pemeliharaan 1

JUMLAH
N DI KAWASN PERKOTAAN
N PERKOTAAN (OTSUS BLOCK GRAND)
022

TUAN

TAL

HARGA / BIAYA
(Rp)

1,500,000.00

1,000,000.0

2,500,000.0
000360000000
000000000000
000000000000
360,000,000.00

000 0 1 Satu
0 2 Dua
0 3 Tiga
360 3 Tiga Ratus 4 Empat
6 Enam Puluh 5 Lima
0 Juta 6 Enam
000 0 7 Tujuh
0 8 Delapan
0 9 Sembilan
000 0
0
0

Tiga Ratus Enam Puluh Juta Rupiah,-

Anda mungkin juga menyukai