REKAPITULASI PENAWARAN BIAYA

PENYUSUNAN MASTER PLAN PERSAMPAHAN KABUPATEN LANGKAT

NO URAIAN TOTAL HARGA

1 BIAYA LANGSUNG PERSONIL Rp 283,800,000

2 BIAYA LANGSUNG NON PERSONIL Rp 72,300,000

SUB TOTAL Rp 356,100,000


PPN 11 % Rp 39,171,000
TOTAL Rp 395,271,000
TERBILANG :
Tiga Ratus Sembilan Puluh Lima Juta Dua Ratus Tujuh Puluh Satu Ribu Rupiah
RINCIAN PENAWARAN BIAYA

PENYUSUNAN MASTER PLAN PERSAMPAHAN KABUPATEN LANGKAT

I. BIAYA LANGSUNG PERSONIL


JUMLAH VOLUME HARGA SATUAN
NO POSISI SATUAN JUMLAH (Rp)
(ORG) (BULAN) (Rp)
1 2 3 4 5 6 7

A. PROFESIONAL STAFF
1 Team Leader/Ahli Lingkungan 1 3.0 Org-Bln 26,000,000 78,000,000
2 Ahli Perencanaan Wilayah dan Kota 1 3.0 Org-Bln 23,000,000 69,000,000
3 Ahli Hidrologi 1 3.0 Org-Bln 23,000,000 69,000,000

B. SUPPORTING STAFF
1 Surveyor 4 2.0 Org-Bln 7,350,000 58,800,000
2 Operator Komputer 1 3.0 Org-Bln 3,000,000 9,000,000

JUMLAH I (A+B) 283,800,000

II. BIAYA LANGSUNG NON PERSONIL


HARGA SATUAN
NO URAIAN JUMLAH VOLUME SATUAN JUMLAH (Rp)
(Rp)
1 2 3 4 5 6 7
A BIAYA KANTOR DAN EXPOSE
1 Bahan Operasional Kantor 1.0 Ls 4,000,000 4,000,000
2 Biaya Komunikasi 1.0 Ls 4,000,000 4,000,000

B BIAYA TRANSPORTASI DAN SURVEY


1 Geolistrik 2.0 Titik 12,000,000 24,000,000
2 Akomodasi Survey 1.0 Ls 7,500,000 7,500,000
3 Sewa Kendaraan Roda Empat Termasuk O&M 1.0 3.0 Unit-Bulan 6,000,000 18,000,000
4 Sewa Kendaraan Roda Dua Termasuk O&M 2.0 2.0 Unit-Bulan 1,200,000 4,800,000

C BIAYA DISKUSI DAN PEMBAHASAN


1 Biaya Pembahasan Laporan 1.0 Ls 4,500,000 4,500,000

D BIAYA PELAPORAN
1 Laporan Pendahuluan 5.0 Buku 160,000 800,000
2 Laporan Antara 5.0 Buku 300,000 1,500,000
3 Laporan Akhir 5.0 Buku 400,000 2,000,000
4 Harddisk (1 TB) 1.0 Unit 1,200,000 1,200,000
JUMLAH II (A+B+C+D) 72,300,000