RENCANA ANGGARAN BIAYA

PEKERJAAN : Pengurusan SLF Bangunan Gedung PT. BIO INTI AGRINDO


LOKASI : Kabuapaten Merauke
TAHUN AGGARAN : 2024

RINCIAN BIAYA LANGSUNG PERSONIL


I. BIAYA LANGSUNG PERSONIL
1.1. Tenaga Ahli ( Profesional Staff )
Harga Jumlah
No. PERSONIL Jangka Volume Satuan Satuan Harga
Waktu (Rp.) (Rp.)
1 Team Leader / Ahli Arsitek 2 1.00 O/B 23,614,500 47,229,000
2 Ahli Struktur Bangunan Gedung 2 1.00 O/B 23,614,500 47,229,000
3 Ahli Mekanikal Elektrikal 2 1.00 O/B 23,614,500 47,229,000
4 Ahli Plambing 2 1.00 O/B 23,614,500 47,229,000
Sub Total 188,916,000

1.2. Tenaga Asisten ( Sub Profesional Staff )

2 Surveyor 2.00 3.00 O/B 10,600,000 63,600,000


3 Draftman / Operator Cad 2.00 2.00 O/B 11,925,000 47,700,000
Sub Total 111,300,000

1.3. Tenaga Pendukung ( Supporting Staff )

1 Administrasi 2.00 1.00 O/B 8,976,000 17,952,000


Sub Total 17,952,000

Total Biaya Langsung Personil 318,168,000


RINCIAN BIAYA LANGSUNG NON PERSONIL
II. BIAYA LANGSUNG NON PERSONIL
2.1. OPERASIONAL TIM TEKNIS DAN PENDAMPING TPA DAN TPT DINAS
Harga Jumlah
Jangka
No. URAIAN Volume Satuan Satuan Harga
Waktu
(Rp.) (Rp.)

1 Transportasi 1 2 Mobil 2,700,000 5,400,000


2 Akomodasi 1 12 Orang 400,000 4,800,000
3 Laporan Realisasi Kegiatan 1 1 LS 11,100,000 11,100,000
Sub Total 21,300,000

2.2. TIM KETERANGAN RENCANA KABUPATEN (KRK)

Transportasi 1 1 Mobil 2,700,000 2,700,000


Akomodasi 1 4 Orang 400,000 1,600,000
Retribusi KRK 1 162 Bangunan 140,000 22,680,000
Sub Total 26,980,000

2.3. SEWA KENDARAAN TEAM AHLI

1 Sewa Kendaraan Roda 4 1 2 Mobil 12,000,000 24,000,000


2 Sewa Kendaraan Roda 2 1 2 Motor 3,400,000 6,800,000
Sub Total 30,800,000

2.4.SEWA PERALATAN KANTOR.

1 LAPTOP 1.00 2 Unit/Bulan 1,800,000 3,600,000


2 PRINTER A-3 1.00 1 Unit/Bulan 1,000,000 1,000,000
3 PRINTER A-4 1.00 1 Unit/Bulan 650,000 650,000
4 DIGITAL CAMERA 1.00 2 Unit/Bulan 650,000 1,300,000
Sub Total 6,550,000

2.5. PERALATAN PEMETAAN

1 SEWA GPS 1 1 Unit/Bulan 1,100,000 1,100,000


Sub Total 1,100,000

2.6. BIAYA KOMUNIKASI

KANTOR UTAMA KEGIATAN 1 1 Unit/Bulan 1,100,000 1,100,000


KOMUNIKASI LAPANGAN 1 1 Unit/Bulan 600,000 600,000
Sub Total 1,700,000

2.7. BIAYA PELAPORAN

1 LAPORAN AKHIR 1 3 Buku 500,000 1,500,000


2 PETA / GAMBAR A3 1 3 Buku 300,000 900,000
3 PETA / GAMBAR A2 1 2 Buku 400,000 800,000
4 ATK KANTOR 1 1 Kegiatan 4,000,000 4,000,000
5 FLASH DISK 1 1 Ls 250,000 250,000
Sub Total 7,450,000

2.8.BIAYA KONSUMSI

1 KONSUMSI RAPAT DINAS 1.00 22 Orang 55,000 1,210,000


2 KONSUMSI TURUN LAPANGAN 2.00 26 Orang 110,000 5,720,000
Sub Total 6,930,000

Total Biaya Langsung Non Personil 85,630,000


REKAPITULASI RENCANA ANGGARAN BIAYA

PEKERJAAN : Pengurusan SLF Bangunan Gedung PT. BIO INTI AGRINDO


LOKASI : Kabuapaten Merauke
TAHUN AGGARAN : 2024

A. BIAYA LANGSUNG PERSONIL


1.1. Tenaga Ahli ( Profesional Staff ) 188,916,000
1.2. Tenaga Asisten ( Sub Profesional Staff ) 111,300,000
1.3. Tenaga Pendukung ( Supporting Staff ) 17,952,000

Sub Total Biaya Langsung Personil 318,168,000

B. BIAYA LANGSUNG NON PERSONIL


2.1. OPERASIONAL TIM TEKNIS DAN PENDAMPING TPA DAN TPT DINAS 21,300,000
2.2. TIM KETERANGAN RENCANA KABUPATEN (KRK) 26,980,000
2.3. SEWA KENDARAAN TEAM AHLI 30,800,000
2.4.SEWA PERALATAN KANTOR. 6,550,000
2.5. PERALATAN PEMETAAN 1,100,000
2.6. BIAYA KOMUNIKASI 1,700,000
2.7. BIAYA PELAPORAN 7,450,000
2.8.BIAYA KONSUMSI 6,930,000

Sub Total Biaya Langsung Non Personil 102,810,000

TOTAL BIAYA 420,978,000


PPN 11% 46,307,580

TOTAL BIAYA 467,285,580


DIBULATKAN 467,200,000

Terbilang : Empat Ratus Enam Puluh Tujuh Juta Dua Ratus Ribu Rupiah

Merauke, 21 Maret 2024

DIBUAT OLEH ;
KONSULTAN PERENCANAAN
CV. EDEN PRISMA ENGINEERING

ANATASIA BUNMOP
DIREKTRIS