HARGA PERKIRAAN SENDIRI (HPS)

KEGIATAN : Rehabilitasi Jaringan Irigasi


PEKERJAAN : Pengawasan Rehabilitasi Jaringan Irigasi D.I.R Serdang Pergam

I. BELANJA LANGSUNG PERSONIL


NO URAIAN KEGIATAN Orang BULAN OB Harga Satuan
A TENAGA AHLI
1 Site Engineer 1 8 8 5,000,000.00

B TENAGA PENDUKUNG
1 Inspector 1 8 8 3,000,000.00
2 Operator Komputer 1 8 8 2,200,000.00

JUMLAH I

II. BELANJA NON PERSONIL


NO URAIAN KEGIATAN VOLUME SATUAN BIAYA SATUAN TOTAL
A OPERASIONAL KE LAPANGAN
1 Biaya Transportasi 1 Paket 5,000,000.00 5,000,000.00

B OPERASIONAL KANTOR
1 Biaya Operasional Kantor 1 Paket 1,800,000.00 1,800,000.00
2 Biaya Komunikasi 1 Paket 1,600,000.00 1,600,000.00

C BIAYA LAPORAN
1 Laporan Pendahuluan 3 SET 25,000.00 75,000.00
2 Laporan Bulanan 16 SET 25,000.00 400,000.00
3 Laporan Akhir 3 SET 100,000.00 300,000.00
4 Flash Disk 1 SET 135,000.00 135,000.00
JUMLAH II 9,310,000.00

JUMLAH BIAYA KONSULTAN


I BELANJA LANGSUNG PERSONIL 81,600,000.00
II BIAYA NON PERSONIL 9,310,000.00
JUMLAH 90,910,000.00
PN 10 % 9,091,000.00
TOTAL 100,001,000.00
PEMBULATAN 100,000,000.00

Terbilang : Seratus Juta Rupiah


PEJABAT PEMBUAT KOMITMEN
Dinas Pekerjaan Umum dan Penataan Ruang
Provinsi Kepulauan Bangka Belitung

ROOYMAN HERLAMBANG, S.T.


NIP. 19740514 200501 1 010
Jumlah

40,000,000.00

24,000,000.00
17,600,000.00

81,600,000.00

TOTAL

5,000,000.00

1,800,000.00
1,600,000.00

75,000.00
400,000.00
300,000.00
135,000.00
9,310,000.00

PEMBUAT KOMITMEN
n Umum dan Penataan Ruang
pulauan Bangka Belitung

N HERLAMBANG, S.T.
740514 200501 1 010
ANALISA HARGA SATUAN
BIAYA LANGSUNG PERSONIL (BLP)

Pekerjaan : Pengawasan Rehabilitasi Jaringan Irigasi D.I.R Serdang Pergam

Lokasi : Serdang - Pergam


Waktu Pelaksanaan : 8 (delapan) bulan
Personil : Site Engineering / Tim Leader

BILLING HARGA
NO KOMPONEN BLP KOEFISIEN NASIONAL KOEF. YANG RATE SATUAN
DIPAKAI (Rp.) (Rp.)
1 2 3 4 5

a Gaji Dasar (GD) = Basic Salary 1 x GD 1.00 1,869,500 1,869,500

b Beban Biaya Sosial (BBS) (0,3 s/d 0,4) x GD 0.35 1,869,500 654,325
(Sosial Charge)

c Beban Biaya Umum (BBU) (0,5 s/d 1,3) x GD 0.90 1,869,500 1,682,550

d Tunjangan Penugasan (TP) (0,1 s/d 0,3) x GD 0.20 1,869,500 373,900

e Keuntungan (K)
({K = 0,1 x {GD + BBS + BBU}) 0,1 x (GD + BBS + BBU) 0.10 4,206,375 420,638

JUMLAH 5,000,913
DIBULATKAN 5,000,000

BIAYA LANGSUNG PERSONIL (BLP)

Pekerjaan : Pengawasan Rehabilitasi Jaringan Irigasi D.I.R Serdang Pergam

Lokasi : Serdang - Pergam


Waktu Pelaksanaan : 8 (delapan) bulan
Personil : Inspector

BILLING HARGA
NO KOMPONEN BLP KOEFISIEN NASIONAL KOEF. YANG RATE SATUAN
DIPAKAI (Rp.) (Rp.)
1 2 3 4 5

a Gaji Dasar (GD) = Basic Salary 1 x GD 1.00 1,121,500 1,121,500

b Beban Biaya Sosial (BBS) (0,3 s/d 0,4) x GD 0.35 1,121,500 392,525
(Sosial Charge)

c Beban Biaya Umum (BBU) (0,5 s/d 1,3) x GD 0.90 1,121,500 1,009,350

d Tunjangan Penugasan (TP) (0,1 s/d 0,3) x GD 0.20 1,121,500 224,300

e Keuntungan (K)
({K = 0,1 x {GD + BBS + BBU}) 0,1 x (GD + BBS + BBU) 0.10 2,523,375 252,338

JUMLAH 3,000,013
DIBULATKAN 3,000,000
BIAYA LANGSUNG PERSONIL (BLP)

Pekerjaan : Pengawasan Rehabilitasi Jaringan Irigasi D.I.R Serdang Pergam

Lokasi : Serdang - Pergam


Waktu Pelaksanaan : 8 (delapan) bulan
Personil : Operator Komputer

BILLING HARGA
NO KOMPONEN BLP KOEFISIEN NASIONAL KOEF. YANG RATE SATUAN
DIPAKAI (Rp.) (Rp.)
1 2 3 4 5

a Gaji Dasar (GD) = Basic Salary 1 x GD 1.00 822,500 822,500

b Beban Biaya Sosial (BBS) (0,3 s/d 0,4) x GD 0.35 822,500 287,875
(Sosial Charge)

c Beban Biaya Umum (BBU) (0,5 s/d 1,3) x GD 0.90 822,500 740,250

d Tunjangan Penugasan (TP) (0,1 s/d 0,3) x GD 0.20 822,500 164,500

e Keuntungan (K)
({K = 0,1 x {GD + BBS + BBU}) 0,1 x (GD + BBS + BBU) 0.10 1,850,625 185,063

JUMLAH 2,200,188
DIBULATKAN 2,200,000