JUMLAH I 32,500,000.00
IV BIAYA UMUM
1 EE Buku 12 200,000.00 2,400,000.00
2 Gambar Buku 12 200,000.00 2,400,000.00
4 ATK Ls 1 5,130,000.00 5,130,000.00
JUMLAH VI 9,930,000.00
TOTAL 81,830,000.00
PPn 10 % 8,183,000.00
JUMLAH TOTAL 90,013,000.00
DIBULATKAN 90,000,000.00
Terbilang :
SEMBILAN PULUH JUTA RUPIAH
REKAPITULASI
TOTAL BIAYA
NO. URAIAN
( Rp. )
Total 32,665,000.00
PPN 10 % 3,266,500.00
TOTAL 35,931,500.00
DIBULATKAN 35,930,000.00
Terbilang :
Dua Puluh Sembilan Juta Lima Ratus Ribu Rupiah
......................................
DIREKTUR
RENCANA ANGGARAN BIAYA
JUMLAH I 22,100,000.00
II SOPPRTING STAFF
1 Drafter/Estimator 2 OB 1.30 2,000,000.00 5,200,000.00
2 Surveyor
3 Administrasi 1 OB 1.30 1,500,000.00 1,950,000.00
JUMLAH II 7,150,000.00
Sub. Total 29,250,000.00
JUMLAH IV 1,040,000.00
V PERALATAN
1 Rol Meter 1 Buah 1.00 200,000.00 200,000.00
JUMLAH V 200,000.00
VI LAPORAN - LAPORAN
1 EE 2 Buku 1.00 300,000.00 600,000.00
2 Gambar 2 Buku 1.00 300,000.00 600,000.00
JUMLAH VI 1,200,000.00
Sub. Total 3,415,000.00
TOTAL 32,665,000.00
PPn 10 % 3,266,500.00
JUMLAH TOTAL 35,931,500.00
DIBULATKAN 35,930,000.00
Terbilang :
Dua Puluh Sembilan Juta Lima Ratus Ribu Rupiah
LEMBARAN KERJA ( LK )
JUMLAH I 18,200,000.00
II SOPPRTING STAFF
1 Drafter/Estimator 1.3 OB 2 Org 2,000,000.00 5,200,000.00
2 Surveyor 1.3 OB 2 Org 2,000,000.00 5,200,000.00
3 Administrator 1.3 OB 1 Org 1,500,000.00 1,950,000.00
JUMLAH II 12,350,000.00
Sub. Total 30,550,000.00
JUMLAH IV 21,920,000.00
V PERALATAN
1 Rol Meter 1 Buah 250,000.00 250,000.00
2 Printer A3 1 Buah 2,850,000.00 2,850,000.00
JUMLAH V 3,100,000.00
VI LAPORAN - LAPORAN
1 EE Buku 6 500,000.00 3,000,000.00
2 Gambar Buku 6 500,000.00 3,000,000.00
JUMLAH VI 6,000,000.00
Sub. Total 46,020,000.00
TOTAL 76,570,000.00
PPn 10 % 7,657,000.00
JUMLAH TOTAL 84,227,000.00
DIBULATKAN 84,230,000.00
Terbilang :
SEMBILAN PULUH JUTA RUPIAH
LEMBARAN KERJA ( LK )
JUMLAH I 123,750,000.00
JUMLAH II 15,000,000.00
TOTAL 200,000,000.00
Terbilang :
dua ratus juta rupiah
Mengetahui,
Kepala Dinas Pekerjaan Umum dan Penataan Ruang
Kabupaten Halmahera Utara
10
11
12
13
14
DAFTAR HADIR
15
16
17
18
19
20
21
22
23
24
25
26
27
28
DAFTAR HADIR
29
30
31
32
33
34
35
36
37
38
39
40
41
42
DAFTAR HADIR
Acara : Launching Proyek Perubahan Sabeta & Presentasi Peta Penegasan Batas Kecamatan Tobelo
10
11
12
13
14
DAFTAR HADIR
Acara : Launching Proyek Perubahan Sabeta & Presentasi Peta Penegasan Batas Kecamatan Tobelo
15
16
17
18
19
20
21
22
23
24
25
26
27
28
DAFTAR HADIR
Acara : Launching Proyek Perubahan Sabeta & Presentasi Peta Penegasan Batas Kecamatan Tobelo
29
30
31
32
33
34
35
36
37
38
39
40
41
42
DAFTAR HADIR
Hari, Tanggal :
Waktu :
Tempat :
Acara :
10
11
12
13
14
DAFTAR HADIR
Hari, Tanggal :
Waktu :
Tempat :
Acara :
15
16
17
18
19
20
21
22
23
24
25
26
27
28
DAFTAR HADIR
Hari, Tanggal :
Waktu :
Tempat :
Acara :
29
30
31
32
33
34
35
36
37
38
39
40
41
42