LEMBARAN KERJA ( LK )

PROGRAM : PENGADAAN KONSTRUKSI JARINGAN AIR BERSIH/MINUM


KABUPATEN HALMAHERA UTARA
KEGIATAN : PERENCANAAN AIR BERSIH
JANGKA WAKTU : 40 (EMPAT PULUH) HARI KALENDER
LOKASI : TERSEBAR
TAHUN ANGGARAN : 2014

A BIAYA LANGSUNG PERSONIL


JUMLAH
VOLUME HARGA SATUAN
NO. JABATAN BIAYA KETERANGAN
SATUAN JUMLAH ( Rp. ) ( Rp. )

I PROFESIONAL STAFF / TENAGA AHLI


1 Tim Perencanaan 1.3 OB 2 Org 2,500,000.00 6,500,000.00
2 Tim Pelaksanaan 1.3 OB 5 Org 3,000,000.00 19,500,000.00
3 Tim Pengawasan 1.3 OB 2 Org 2,500,000.00 6,500,000.00

JUMLAH I 32,500,000.00

B BIAYA LANGSUNG NON PERSONIL


JUMLAH
VOLUME HARGA SATUAN
NO. JABATAN BIAYA KETERANGAN
SATUAN JUMLAH ( Rp. ) ( Rp. )

III BIAYA PERJALANAN DAN AKOMODASI


1 Tim Perencanaan
- Tobelo - Loloda Utara/Kepulauan 2 Org 1 kali 3,000,000.00 6,000,000.00
- Tobelo 2 Org 1 kali 400,000.00 800,000.00
2 Tim Pelaksanaan
- Tobelo - Loloda Utara/Kepulauan 5 Org 1 kali 3,000,000.00 15,000,000.00
- Tobelo 5 Org 2 kali 400,000.00 4,000,000.00
3 Tim Pengawasan
- Tobelo - Loloda Utara/Kepulauan 2 Org 2 kali 3,000,000.00 12,000,000.00
- Tobelo 2 Org 2 kali 400,000.00 1,600,000.00

JUMLAH III 39,400,000.00

IV BIAYA UMUM
1 EE Buku 12 200,000.00 2,400,000.00
2 Gambar Buku 12 200,000.00 2,400,000.00
4 ATK Ls 1 5,130,000.00 5,130,000.00

JUMLAH VI 9,930,000.00

TOTAL 81,830,000.00
PPn 10 % 8,183,000.00
JUMLAH TOTAL 90,013,000.00
DIBULATKAN 90,000,000.00
Terbilang :
SEMBILAN PULUH JUTA RUPIAH
REKAPITULASI

PROGRAM PENGADAAN KONSTRUKSI JARINGAN AIR BERSIH/MINUM


KEGIATAN PERENCANAAN AIR BERSIH
PEKERJAAN Err:509
JANGKA WAKTU 40 (EMPAT PULUH) HARI KALENDER
LOKASI TERSEBAR
TAHUN ANGGARAN 2014

TOTAL BIAYA
NO. URAIAN
( Rp. )

A. BIAYA LANGSUNG PERSONIL

I. PROFESIONAL STAFF / TENAGA AHLI 22,100,000.00


II SOPPRTING STAFF 7,150,000.00
Sub. Total 29,250,000.00

B. BIAYA LANGSUNG NON PERSONIL

III BIAYA PERJALANAN DAN AKOMODASI 975,000.00


IV TRANSPORTASI DAN BIAYA UMUM 1,040,000.00
V PERALATAN 200,000.00
VI LAPORAN - LAPORAN 1,200,000.00
Sub. Total 3,415,000.00

Total 32,665,000.00
PPN 10 % 3,266,500.00
TOTAL 35,931,500.00
DIBULATKAN 35,930,000.00

Terbilang :
Dua Puluh Sembilan Juta Lima Ratus Ribu Rupiah

Tobelo, 29 Januari 2014


Konsultan Perencana
CV. GALANG TEKNIK

......................................
DIREKTUR
RENCANA ANGGARAN BIAYA

PROGRAM : PENGADAAN KONSTRUKSI JARINGAN AIR BERSIH/MINUM


KABUPATEN HALMAHERA UTARA
KEGIATAN : PERENCANAAN AIR BERSIH
JANGKA WAKTU : 40 (EMPAT PULUH) HARI KALENDER
LOKASI : TERSEBAR
TAHUN ANGGARAN : 2014

A BIAYA LANGSUNG PERSONIL


ORANG/BULAN BEBAN BIAYA JUMLAH
NO. JABATAN ORANG / PERSONIL BIAYA
VOLUME
BULAN ( Rp. ) ( Rp. )

I PROFESIONAL STAFF / TENAGA AHLI


1 Team Leader 1 OB 1.30 7,500,000.00 9,750,000.00
2 Tenaga Ahli Arsitektural 1 OB 1.30 4,750,000.00 6,175,000.00
3 Tenaga Ahli Sipil 1 OB 1.30 4,750,000.00 6,175,000.00

JUMLAH I 22,100,000.00

II SOPPRTING STAFF
1 Drafter/Estimator 2 OB 1.30 2,000,000.00 5,200,000.00
2 Surveyor
3 Administrasi 1 OB 1.30 1,500,000.00 1,950,000.00

JUMLAH II 7,150,000.00
Sub. Total 29,250,000.00

B BIAYA LANGSUNG NON PERSONIL


BEBAN BIAYA JUMLAH
NO. JABATAN VOLUME BULAN PERSONIL BIAYA
( Rp. ) ( Rp. )

III BIAYA PERJALANAN DAN AKOMODASI


1 Team Leader 1 Org 1.30 350,000.00 455,000.00
2 Tenaga Ahli Arsitektural 2 Org 1.30 200,000.00 520,000.00

JUMLAH III 975,000.00

IV TRANSPORTASI DAN BIAYA UMUM


1 Sewa Kendaraan Roda Dua + BBM 1 unit 1.30 500,000.00 650,000.00
2 Sewa Speedboat
3 Biaya Umum ( ATK ) 1 unit 1.30 300,000.00 390,000.00

JUMLAH IV 1,040,000.00

V PERALATAN
1 Rol Meter 1 Buah 1.00 200,000.00 200,000.00

JUMLAH V 200,000.00

VI LAPORAN - LAPORAN
1 EE 2 Buku 1.00 300,000.00 600,000.00
2 Gambar 2 Buku 1.00 300,000.00 600,000.00

JUMLAH VI 1,200,000.00
Sub. Total 3,415,000.00

TOTAL 32,665,000.00
PPn 10 % 3,266,500.00
JUMLAH TOTAL 35,931,500.00
DIBULATKAN 35,930,000.00
Terbilang :
Dua Puluh Sembilan Juta Lima Ratus Ribu Rupiah
LEMBARAN KERJA ( LK )

PROGRAM : PENGADAAN KONSTRUKSI JARINGAN AIR BERSIH/MINUM


KABUPATEN HALMAHERA UTARA
KEGIATAN : PERENCANAAN AIR BERSIH
JANGKA WAKTU : 40 (EMPAT PULUH) HARI KALENDER
LOKASI : TERSEBAR
TAHUN ANGGARAN : 2014

A BIAYA LANGSUNG PERSONIL


JUMLAH
VOLUME HARGA SATUAN
NO. JABATAN BIAYA
SATUAN JUMLAH ( Rp. ) ( Rp. )

I PROFESIONAL STAFF / TENAGA AHLI


1 Tim Perencana 1.3 OB 1 Org 6,000,000.00 7,800,000.00
2 Tim Pelaksana 1.3 OB 1 Org 4,000,000.00 5,200,000.00
3 Tim Pengawasan 1.3 OB 1 Org 4,000,000.00 5,200,000.00

JUMLAH I 18,200,000.00

II SOPPRTING STAFF
1 Drafter/Estimator 1.3 OB 2 Org 2,000,000.00 5,200,000.00
2 Surveyor 1.3 OB 2 Org 2,000,000.00 5,200,000.00
3 Administrator 1.3 OB 1 Org 1,500,000.00 1,950,000.00

JUMLAH II 12,350,000.00
Sub. Total 30,550,000.00

B BIAYA LANGSUNG NON PERSONIL


JUMLAH
VOLUME HARGA SATUAN
NO. JABATAN BIAYA
SATUAN JUMLAH ( Rp. ) ( Rp. )

III BIAYA PERJALANAN DAN AKOMODASI


1 Tim Perencana 1 Org 3 kali 2,000,000.00 6,000,000.00
2 Tim Pelaksana 1 Org 3 kali 1,500,000.00 4,500,000.00
3 Tenaga Ahli Sipil 1 Org 3 kali 1,500,000.00 4,500,000.00

JUMLAH III 15,000,000.00

IV TRANSPORTASI DAN BIAYA UMUM


1 Sewa Kendaraan Roda Empat + BBM 1 unit 3 Hari 1,000,000.00 3,000,000.00
2 Sewa Speedboat 1 unit 3 hari 6,000,000.00 18,000,000.00
3 Biaya Umum ( ATK ) Ls 1 920,000.00 920,000.00

JUMLAH IV 21,920,000.00

V PERALATAN
1 Rol Meter 1 Buah 250,000.00 250,000.00
2 Printer A3 1 Buah 2,850,000.00 2,850,000.00

JUMLAH V 3,100,000.00

VI LAPORAN - LAPORAN
1 EE Buku 6 500,000.00 3,000,000.00
2 Gambar Buku 6 500,000.00 3,000,000.00

JUMLAH VI 6,000,000.00
Sub. Total 46,020,000.00

TOTAL 76,570,000.00
PPn 10 % 7,657,000.00
JUMLAH TOTAL 84,227,000.00
DIBULATKAN 84,230,000.00
Terbilang :
SEMBILAN PULUH JUTA RUPIAH
LEMBARAN KERJA ( LK )

PAKET PEKERJAAN : RTH Kawasan Perkotaan Galela


KEGIATAN : Penyusunan Rencana Teknis Ruang Kawasan
JANGKA WAKTU : 150 (seratus lima puluh) HARI KALENDER
LOKASI : Kawasan Perkotaan Galela
TAHUN ANGGARAN : 2018

A BIAYA LANGSUNG PERSONIL


JUMLAH
VOLUME HARGA SATUAN
NO. JABATAN BIAYA KETERANGAN
SATUAN JUMLAH ( Rp. ) ( Rp. )

I PROFESIONAL STAFF / TENAGA AHLI


1 Tim Perencanaan 5 OB 2 Org 750,000.00 7,500,000.00
2 Tim Pelaksanaan
-. Arsitektur 5 OB 1 Org 9,750,000.00 48,750,000.00
-. Planologi 5 OB 1 Org 9,750,000.00 48,750,000.00
-. Surveyor 5 OB 3 Org 750,000.00 11,250,000.00
3 Tim Pengawasan 5 OB 2 Org 750,000.00 7,500,000.00

JUMLAH I 123,750,000.00

B BIAYA LANGSUNG NON PERSONIL


JUMLAH
VOLUME HARGA SATUAN
NO. JABATAN BIAYA KETERANGAN
SATUAN JUMLAH ( Rp. ) ( Rp. )

II BIAYA PERJALANAN DINAS


1 Sewa Transportasi Darat kg 1 15,000,000.00 15,000,000.00

JUMLAH II 15,000,000.00

III BIAYA UMUM


1 ATK Ls 1 10,000,000.00 10,000,000.00
2 Cetak Ls 1 15,000,000.00 15,000,000.00
3 Pengandaan Ls 1 15,000,000.00 15,000,000.00
4 Presentasi/ Konsultasi
-. Insentif Peserta org 60 150,000.00 9,000,000.00
-. Makan minum org 60 80,000.00 4,800,000.00
-. Sewa Trasportasi Darat hari 3 1,000,000.00 3,000,000.00
-. ATK Ls 1 2,000,000.00 2,000,000.00
-. Penggandaan Ls 1 1,450,000.00 1,450,000.00
-. Cetak Ls 1 1,000,000.00 1,000,000.00
JUMLAH III 61,250,000.00

TOTAL 200,000,000.00
Terbilang :
dua ratus juta rupiah

Tobelo, 12 Maret 2018


Dibuat oleh : Diperiksa oleh :
Tim Perencanaan PPK TATA RUANG

Jenny Evelyn May, ST, M.Eng Wilson Alexander, ST, MT


NIP. 197202022003121009 NIP. 197811062009031001

Mengetahui,
Kepala Dinas Pekerjaan Umum dan Penataan Ruang
Kabupaten Halmahera Utara

BERNARD TH. PAWATTE, BE


NIP. 196401171986101003
DAFTAR HADIR

Hari, Tanggal : Senin, 30 Juli 2018


Waktu : 09.00 WIT - Selesai
Tempat : Aula Kantor Kecamatan Kao
Acara : Sosialisasi RTH Kawasan Perkotaan Kao

No NAMA JABATAN TANDA TANGAN

10

11

12

13

14
DAFTAR HADIR

Hari, Tanggal : Senin, 30 Juli 2018


Waktu : 09.00 WIT - Selesai
Tempat : Aula Kantor Kecamatan Kao
Acara : Sosialisasi RTH Kawasan Perkotaan Kao

15

16

17

18

19

20

21

22

23

24

25

26

27

28
DAFTAR HADIR

Hari, Tanggal : Senin, 30 Juli 2018


Waktu : 09.00 WIT - Selesai
Tempat : Aula Kantor Kecamatan Kao
Acara : Sosialisasi RTH Kawasan Perkotaan Kao

29

30

31

32

33

34

35

36

37

38

39

40

41

42
DAFTAR HADIR

Hari, Tanggal : Rabu,04 Agustus 2018


Waktu : 09.00 WIT - Selesai
Tempat : Kantor Camat Tobelo

Acara : Launching Proyek Perubahan Sabeta & Presentasi Peta Penegasan Batas Kecamatan Tobelo

No NAMA JABATAN TANDA TANGAN

10

11

12

13

14
DAFTAR HADIR

Hari, Tanggal : Rabu,04 Agustus 2018


Waktu : 09.00 WIT - Selesai
Tempat : Kantor Camat Tobelo

Acara : Launching Proyek Perubahan Sabeta & Presentasi Peta Penegasan Batas Kecamatan Tobelo

15

16

17

18

19

20

21

22

23

24

25

26

27

28
DAFTAR HADIR

Hari, Tanggal : Rabu,04 Agustus 2018


Waktu : 09.00 WIT - Selesai
Tempat : Kantor Camat Tobelo

Acara : Launching Proyek Perubahan Sabeta & Presentasi Peta Penegasan Batas Kecamatan Tobelo

29

30

31

32

33

34

35

36

37

38

39

40

41

42
DAFTAR HADIR

Hari, Tanggal :
Waktu :
Tempat :

Acara :

No NAMA JABATAN TANDA TANGAN

10

11

12

13

14
DAFTAR HADIR

Hari, Tanggal :
Waktu :
Tempat :

Acara :

15

16

17

18

19

20

21

22

23

24

25

26

27

28
DAFTAR HADIR

Hari, Tanggal :
Waktu :
Tempat :

Acara :