RENCANA ANGGARAN BIAYA - HPS

RENCANA INDUK PELABUHAN (RIP) PELABUHAN KASIPUTE


KABUPATEN BOMBANA
SULAWESI TENGGARA

HARGA
NO URAIAN VOLUME SATUAN
SATUAN ( Rp )
BIAYA LANGSUNG PERSONIL
I PELAKSANA
TENAGA AHLI
1 Team Leader 1 1 org, bln 7,000,000.00
2 Ahli Struktur (Teknik Sipil) 2 1 org, bln 6,000,000.00
3 Ahli Arsitektur PPW 2 1 org, bln 6,000,000.00
4 Ahli Hidrologi 2 1 org, bln 6,000,000.00
5 Ahli Ekonomi Transportasi 2 1 org, bln 6,000,000.00
6 Asisten Ahli Struktur 2 1 org, bln 4,500,000.00
7 Asisten Ahli Transportasi Laut 2 1 org, bln 4,500,000.00
8 Asisten Ahli Arsitektur 2 1 org, bln 4,500,000.00
9 Asisten Ahli Hidrologi 2 1 org, bln 4,500,000.00
10 Asisten Ahli Ekonomi Transportasi 2 1 org, bln 4,500,000.00
11 Asisten Survey dan Pemetaan 2 1 org, bln 4,000,000.00

TENAGA PENDUKUNG
1 Draftman/Autocad Bangunan 2 1 org, bln 3,000,000.00
2 Draftman/Autocad Peta 2 1 org, bln 3,000,000.00
3 Surveyor 26 10 org, hari 180,000.00
4 Typist 2 1 org, bln 2,500,000.00
JUMLAH ( I )
BIAYA LANGSUNG NON PERSONIL
I. PERALATAN DAN SURVEY
1 Survey Hidrografi 1 ls 20,000,000.00
2 Survey Bathimetri 1 ls 22,500,000.00
3 Survey Topografi 1 ls 25,000,000.00
4 Survey Penyelidikan Tanah 1 ls 15,000,000.00
JUMLAH ( I )

II. BAHAN HABIS PAKAI (BHP)


1 ATK - 1 ls 5,600,000.00
JUMLAH ( II )

III. PERJALANAN
1 Sewa Kendaraan Roda 4 3 8 unit, hari 450,000.00
2 Akomodasi dan Komunikasi Team 15 4 org, kali 200,000.00
JUMLAH ( III )
IV. LAPORAN

1 Penggandaan Laporan Pendahuluan - 10 Eks 150,000.00


2 Penggandaan Laporan Antara - 10 Eks 300,000.00
3 Penggandaan Laporan Akhir - 10 Eks 450,000.00
4 Print out Peta - 10 Eks 500,000.00
5 3D Out - 1 ls 5,000,000.00
6 Seminar Pendahuluan - 1 ls 7,500,000.00
7 Seminar Akhir - 1 ls 7,500,000.00
8 Back Up Pelaporan - 10 Eks 150,000.00
JUMLAH ( IV )
RENCANA ANGGARAN BIAYA - HPS
RENCANA INDUK PELABUHAN (RIP) PELABUHAN KASIPUTE
KABUPATEN BOMBANA
SULAWESI TENGGARA

HARGA
NO URAIAN VOLUME SATUAN
SATUAN ( Rp )

Rumbia, 4 November 2015


PEJABAT PEMBUAT KOMITMEN

MUHAMMAD ARIS, S.Pd


Penata Tk.I, III/d
NIP. 198012312005021005
JUMLAH
( Rp )

7,000,000.00
12,000,000.00
12,000,000.00
12,000,000.00
12,000,000.00
9,000,000.00
9,000,000.00
9,000,000.00
9,000,000.00
9,000,000.00
8,000,000.00

6,000,000.00
6,000,000.00
46,800,000.00
5,000,000.00
171,800,000.00

20,000,000.00
22,500,000.00
25,000,000.00
15,000,000.00
82,500,000.00

5,600,000.00
5,600,000.00

10,800,000.00
12,000,000.00
22,800,000.00

1,500,000.00
3,000,000.00
4,500,000.00
5,000,000.00
5,000,000.00
7,500,000.00
7,500,000.00
1,500,000.00
35,500,000.00
JUMLAH
( Rp )

mbia, 4 November 2015


ABAT PEMBUAT KOMITMEN

HAMMAD ARIS, S.Pd

. 198012312005021005
REKAPITULASI PENAWARAN - HPS
RENCANA INDUK PELABUHAN (RIP) PELABUHAN KASIPUTE
KABUPATEN BOMBANA

Jumlah
No Uraian
(Rp)

BIAYA LANGSUNG PERSONIL


I. Pelaksana 171,800,000.00

BIAYA LANGSUNG NON PERSONIL


I. Peralatan 82,500,000.00
II. Bahan Habis Pakai 5,600,000.00
III. Perjalanan 22,800,000.00
IV. Laporan 35,500,000.00

Real Cost 318,200,000.00


PPN 10% 31,820,000.00
Jumlah Total 350,020,000.00
Dibulatkan 350,000,000.00

Terbilang :

Tiga Ratus Lima Puluh Juta Rupiah

Rumbia, 4 November 2015


PEJABAT PEMBUAT KOMITMEN

MUHAMMAD ARIS, S.Pd


Penata Tk.I, III/d
NIP. 198012312005021005