NAMA PAKET : Pengurusan SLF Bangunan Gedung PT. BIO INTI AGRINDO
HARGA
JUMLAH HARGA
No. URAIAN VOLUME DURASI SATUAN SATUAN
Rp. Rp.
I.A TENAGA PROFESIONAL
1 Team Leader / Ahli Arsitek 1 2.00 O/B 23,614,500 47,229,000.00
2 Ahli Struktur Bangunan Gedung 1 2.00 O/B 23,614,500 47,229,000.00
3 Ahli Mekanikal Elektrikal 1 2.00 O/B 23,614,500 47,229,000.00
4 Ahli Plambing 1 2.00 O/B 23,614,500 47,229,000.00
SUB JUMLAH 188,916,000.00
I.B TENAGA SUB PROFESIONAL
1 Operator cad/ Drafter 2 2.00 O/B 11,500,000 46,000,000.00
2 Surveyor 3 2.00 O/B 9,500,000 57,000,000.00
SUB JUMLAH 103,000,000.00
I.C TENAGA PENDUKUNG
1 Administrator / OP. Komputer 1 2.00 O/B 5,000,000 10,000,000.00
SUB JUMLAH 10,000,000.00
HARGA
JUMLAH HARGA
No. URAIAN VOLUME DURASI SATUAN SATUAN
Rp. Rp.
II.A OPERASIONAL TIM TEKNIS DAN PENDAMPING TPA DAN TPT DINAS
1 Transportasi 2 1.00 Mobil 3,000,000.00 6,000,000.00
2 Akomodasi 12 1.00 Orang 700,000.00 8,400,000.00
3 Laporan Realisasi Kegiatan 1 1.00 LS 12,000,000.00 12,000,000.00
SUB JUMLAH 26,400,000.00
PERHITUNGAN REMUNERASI
NO. LAMANYA
BEBAN BIAYA BEBAN TUNJANGAN BIAYA LANGSUNG KET
POSISI YANG DIUSULKAN PENGALAMAN GAJI DASAR BEBAN BIAYA UMUM
SOSIAL PROYEK PERBULAN PERSONIL
KEAHLIAN
(TAHUN) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
3 4 5 6 7 8=( 4+5+6+7) 9
TENAGA PROFESIONAL
1 Team Leader / Ahli Arsitek 1 Tahun 14,317,000.00 2,147,550.00 2,853,950.00 4,296,000.00 23,614,500.00
2 Ahli Struktur Bangunan Gedung 1 Tahun 14,317,000.00 2,147,550.00 2,853,950.00 4,296,000.00 23,614,500.00
3 Ahli Mekanikal Elektrikal 1 Tahun 14,317,000.00 2,147,550.00 2,853,950.00 4,296,000.00 23,614,500.00
4 Ahli Plambing 1 Tahun 14,317,000.00 2,147,550.00 2,853,950.00 4,296,000.00 23,614,500.00
TENAGA PENDUKUNG
1 Administrator / OP. Komputer 1 Tahun 3,035,000.00 455,250.00 597,750.00 912,000.00 5,000,000.00