JUMLAH Rp 2,798,084,000.00
DIBULATKAN Rp 2,798,084,000.00
KONSULTAN PERENCANA 3.55% Rp 99,331,982.00
KONSULTAN PENGAWAS 2.49% Rp 69,672,291.60
PENGELOLA KEGIATAN 0.79% Rp 22,104,863.60
JUMLAH Rp 2,989,193,137.20
DIBULATKAN Rp 2,989,193,000.00
TERBILANG : DUA MILYAR SEMBILAN RATUS DELAPAN PULUH SEMBILAN JUTA SERATUS SEMBILAN PULUH TIGA
RIBU RUPIAH
2,798,083,255.00
(745.00)
2,967,087,528.60
(191,109,745.00)
REKAPITULASI BIAYA
Terbilang : TIGA PULUH SEMBILAN JUTA SEMBILAN RATUS SEMBILAN PULUH LIMA
RIBU RUPIAH
40,000,000.00
-
RINCIAN ANGGARAN BIAYA
7844.4
24750
88 513
429.1666666667
3.36
0 2.52
0 21.12
4.312
31.312
#VALUE! #VALUE!
REKAPITULASI BIAYA
Terbilang : LIMA PULUH LIMA JUTA TUJUH RATUS ENAM PULUH SEMBILAN RIBU RUPIAH
RINCIAN ANGGARAN BIAYA
SATUAN KERJA : DINAS PEKERJAAN UMUM
PROGRAM : PENINGKATAN SARANA DAN PRASARANA APARATUR
KEGIATAN : REHABILITASI SEDANG/ BERAT GEDUNG KANTOR
PEKERJAAN : REHAB. GARASI BUS BALAI PENGUJIAN
LOKASI : JL. RING ROAD UTARA, MAGUWOHARJO, SLEMAN YOGYAKARTA
TH. ANGGARAN : 2008
No. JENIS PEKERJAAN VOLUME SAT. HARGA TOTAL SUB
SATUAN HARGA JUMLAH
Rp. Rp Rp
I. PEKERJAAN PESIAPAN
-
1 Pembersihan Lokasi/ Bongkaran 108.00 m2 2,000.00 216,000.00
2 Uitzet Bouwplank 1.00 ls 100,000.00 100,000.00
JUMLAHI - 316,000.00
II PEKERJAAN TANAH DAN PASIR
1 Galian Tanah Pondasi Menerus 22.40 m3 12,430.00 278,432.00
2 Urug tanah kembali 16.80 m3 5,959.00 100,111.20
3 Urug Pasir bawah Pondasi menerus 2.80 m3 62,607.00 175,299.60
J U M L A H II 553,842.80
III PEKERJAAN PASANGAN -
1 Pasangan Pondasi Bt. Kali 1pc : 3kpr : 10psr 12.60 m3 305,047.00 3,843,592.20
J U M L A H III - 3,843,592.20
IV PEKERJAAN BETON -
1 Cor Balok Ring Atas uk.15/20 1.20 m3 2,168,017.00 2,601,620.40
2 Cor Sloof uk. 15/20 utk pengikat 1.68 m3 2,864,833.00 4,812,919.44
3 Cor Kolom Induk uk. 15/25 1.50 m3 3,947,600.00 5,921,400.00
J U M L A H IV - 13,335,939.84
V PEKERJAAN PLESTERAN -
1 Sponengan 216.00 m1 4,640.00 1,002,240.00
2 Plesteran Beton 1:2 15.60 m2 19,752.00 308,131.20
JUMLAH V - 1,310,371.20
VI PEKERJAAN LANTAI
1 Ramp Beton 0.56 m3 443,760.00 249,615.00
J U M L A H VI - 249,615.00
VIII PEKERJAAN PENUTUP ATAP
1 Pasang Atap Asbes Gelombang Besar 168.00 m2 25,000.00 4,200,000.00
2 Bubungan Asbes Gelombang besar 14.00 m1 35,000.00 490,000.00
J U M L A H VIII - 4,690,000.00
X PEKERJAAN LISTRIK
1 Lampu TL 20 watt TKO 3.00 ttk 115,000.00 345,000.00
2 Lampu Bohlamp 25 watt 4.00 ttk 85,000.00 340,000.00
3 Stop Kontak 1.00 ttk 85,000.00 85,000.00
4 Over Spaning Daya 1.00 Ls 150,000.00 150,000.00
5 MCB 1.00 bh 150,000.00 150,000.00
JUMLAH X - 1,070,000.00
XI PEKERJAAN BESI DAN KACA
1 Kuda-kuda baja Baja Ringan bentang 9 m' 156.00 m2 132,000.00 20,592,000.00
J U M L A H XII - 20,592,000.00
XIII PEKERJAAN CAT
1 Cat T e m b o k 15.60 m2 8,274.00 129,074.40
J U M L A H XIV 129,074.40
JUMLAH TOTAL 46,090,435.44
REKAPITULASI BIAYA
#VALUE!
#VALUE!
118,800,000.00
855,250,000.00
940,775,000.00 1,796,025,000.00
30,000,000.00
RINCIAN ANGGARAN BIAYA
SATUAN KERJA : DINAS PEKERJAAN UMUM
PROGRAM : PENINGKATAN SARANA DAN PRASARANA APARATUR
KEGIATAN : REHABILITASI SEDANG/ BERAT GEDUNG KANTOR
PEKERJAAN : PEMBUATAN SEKAT/ PARTISI BIDANG BINA PROGRAM
LOKASI : JL. BUMIJO NO. 5 YOGYAKARTA
TH. ANGGARAN : 2008
No. JENIS PEKERJAAN VOLUME SAT. HARGA TOTAL SUB
SATUAN HARGA JUMLAH
Rp. Rp Rp
I. PEKERJAAN PESIAPAN
1 Pemindahan Mebelair 1.00 LS 300,000.00 300,000.00
2 Uitzet Bouwplank 1.00 ls 250,000.00 250,000.00
JUMLAHI - 550,000.00
V PEKERJAAN PARTISI
1 Pasang Rangka Allumunium Coklat 4 " 69.40 m1 65,000.00 4,511,000.00
2 Panil Pengisi dg Gypsum tebal 9 mm 37.50 m2 85,000.00 3,187,500.00
3 Pasang Kaca Es tebal 5 mm 6.50 m2 75,000.00 487,500.00
4 Pasang Pintu Allumunium 2.00 unit 600,000.00 1,200,000.00
5 Door Closer 2.00 unit] 125,000.00 250,000.00
8,186,000.00
VI PEKERJAAN CAT
1 Cat T e m b o k 75.00 m2 8,274.00 620,550.00
-
J U M L A H VI 620,550.00
JUMLAH TOTAL 9,356,550.00
1500000
#VALUE!
REKAPITULASI BIAYA
Terbilang : SEMBILA BELAS JUTA SEMBILAN RATUS SEMBILAN PULUH SEMBILAN RIBU
RUPIAH
RINCIAN ANGGARAN BIAYA
7844.4
24750
88 513
429.1666666667
3.36
0 2.52
0 21.12
4.312
31.312
#VALUE! #VALUE!
REKAPITULASI BIAYA
Terbilang : TUJUH BELAS JUTA SEMBILAN RATUS SEMBILAN PULUH TUJUH RIBU
RUPIAH
RINCIAN ANGGARAN BIAYA
SATUAN KERJA : DINAS PEKERJAAN UMUM
PROGRAM : PENINGKATAN SARANA DAN PRASARANA APARATUR
KEGIATAN : REHABILITASI SEDANG/ BERAT GEDUNG KANTOR
PEKERJAAN : REHAB. TEMPAT PARKIR SUB. DIN CIPTA KARYA
LOKASI : JL. BUMIJO NO.5 YOGYAKARTA
TH. ANGGARAN : 2008
140
104.5 192
18.3333333333333
3.36
0 2.52
0 21.12
4.312
31.312
REKAPITULASI BIAYA
Terbilang : LIMA PULUH ENAM JUTA SEMBILAN RATUS DELAPAN PULUH LIMA RIBU
RUPIAH
45,000,000.00
RINCIAN ANGGARAN BIAYA
SATUAN KERJA : DINAS PENDIDIKAN PROVINSI. DIY
PROGRAM : PENINGKATAN SARANA DAN PRASARANA APARATUR
KEGIATAN : REHABILITASI SEDANG/ BERAT GEDUNG KANTOR
PEKERJAAN : REHABILITASI ATAP DAN PLAFOND SUB. DIN BINA PROGRAM
LOKASI : JL. BUMIJO NO. 5 YOGYAKARTA
TH. ANGGARAN : 2008
No. JENIS PEKERJAAN VOLUME SAT. HARGA TOTAL SUB
SATUAN HARGA JUMLAH
Rp. Rp Rp
I. PEKERJAAN PESIAPAN
1 Bongkaran Atap lama 112.00 m2 5,000.00 560,000.00
2 Pembersihan Lokasi Rehab Gedung 1.00 ls 250,000.00 250,000.00
3 Uitzet Bouwplank Rehab Gedung 1.00 LS 150,000.00 150,000.00
JUMLAHI - 960,000.00
II PEKERJAAN KAYU
1 Papan listplang uk. 2x20, kayu Bangkirai 12.00 m1 52,403.00 628,836.00
2 Talang Jurai dalam 32.00 m1 35,932.00 1,149,824.00
3 Jurai Dalam Ky. Bangkirai uk 8/12 0.31 bh 6,319,117.00 1,941,232.74
4 Rangka Kuda-Kuda Ky. Bangirai uk 8/12 0.38 m3 6,762,650.00 2,596,857.60
5 Gording Ky. Bangkirai uk 8/12 0.58 m3 6,319,117.00 3,639,811.39
6 Nok Uk 8/12 Ky. Bangkirai 0.14 m3 6,319,117.00 909,952.85
7 Usuk 5/7, Reng 2/3 Kayu Bangkirai 165.00 m2 84,903.00 14,008,995.00
8 Papan Ruiter 15.00 m1 22,000.00 330,000.00
9 Windfeer 12.00 m1 15,000.00 180,000.00
J U M L A H VII - 25,385,509.58
III PEKERJAAN PENUTUP ATAP
1 Penggantian Atap genteng Beton 165.00 m2 48,874.00 8,064,210.00
2 Pasang Bubungan Genting yang sejenis 15.00 m1 46,176.00 692,640.00
3 Penggantian Plafond Rg, Kantor 120.00 m2 13,398.00 1,607,760.00
4 Rangka Plafond gedung Kantor 120.00 m2 46,696.00 5,603,520.00
5 Plepet uk 1/3 jati 264.00 m1 4,043.00 1,067,352.00
J U M L A H VIII - 17,035,482.00
IV PEKERJAAN LISTRIK
1 Pembenahan dan Pemasangan Kembali Instalasi 1.00 ls 250,000.00 250,000.00
2 Penggantian Lampu bohlamp dan Instalasinya 2.00 ttk 85,000.00 170,000.00
3 Penggantian Stop kontak yang rusak 2.00 ttk 85,000.00 170,000.00
JUMLAH X - 590,000.00
V PEKERJAAN BESI, KACA DAN SANITASI
1 Plat Begel, Mur baut 25.00 KG 5,000.00 125,000.00
J U M L A H XI - 125,000.00
VI PEKERJAAN CAT
1 Cat Plafond 120.00 M2 8,274.00 992,880.00
2 Cat Genteng dengan Cat air 165.00 m2 7,500.00 1,237,500.00
3 Cat K a y u 27.42 m2 28,036.00 768,747.12
J U M L A H XIII 2,999,127.12
JUMLAH TOTAL 47,095,118.70
REKAPITULASI BIAYA
Terbilang : DUA RATUS ENAM PULUH SEMBILAN JUTA SEMBILAN RATUS SEMBILAN PULUH
DELAPAN RIBU RUPIAH
270,000,000.00
RINCIAN ANGGARAN BIAYA
SATUAN KERJA : DINAS PEKERJAAN UMUM
PROGRAM : PENINGKATAN SARANA DAN PRASARANA APARATUR
KEGIATAN : REHABILITASI SEDANG/ BERAT GEDUNG KANTOR
PEKERJAAN : REHABILITASI ATAP DAN PLAFOND UNIT GEDUNG BAGIAN SELATAN
LOKASI : JL. GOWONGAN KIDUL YOGYAKARTA
TH. ANGGARAN : 2008
No. JENIS PEKERJAAN VOLUME SAT. HARGA TOTAL SUB
SATUAN HARGA JUMLAH
Rp. Rp Rp
I. PEKERJAAN PESIAPAN
1 Bongkaran Atap lama 1,100.00 m2 5,000.00 5,500,000.00
2 Pembersihan Lokasi Rehab Gedung 1.00 ls 1,400,000.00 1,400,000.00
3 Uitzet Bouwplank Rehab Gedung 1.00 LS 500,000.00 500,000.00
JUMLAHI - 7,400,000.00
III PEKERJAAN PASANGAN -
1 Pasangan Batu bata utk peninggian dinding Kantor 144.00 m2 60,521.00 8,715,024.00
J U M L A H III - 8,715,024.00
IV PEKERJAAN BETON -
1 Cor Kolom Praktis Untuk Peninggian dinding Kantor 0.65 m3 3,900,290.00 2,544,939.23
2 Cor umpak Kolom selasar m3 562,305.00 -
3 Cor Ring Gunung-gunung 2.94 m3 1,563,205.00 4,595,822.70
4 Cor Ring uk 15/20 unit kantor 3.24 m3 1,563,205.00 5,064,784.20
J U M L A H IV - 12,205,546.13
V PEKERJAAN PLESTERAN -
1 Plesteran 1pc:3kp:10psr 288.00 m2 14,982.00 4,314,816.00
2 Plesteran Beton 1:2 134.70 m2 18,942.00 2,551,440.05
JUMLAH V - 6,866,256.05
VII PEKERJAAN KAYU
1 Papan listplang uk. 2x20, kayu Bangkirai 12.00 m1 52,403.00 628,836.00
2 Talang Jurai dalam 32.00 m1 35,932.00 1,149,824.00
3 Jurai Dalam Ky. Bangkirai uk 8/12 0.92 bh 6,319,117.00 5,823,698.23
4 Rangka Kuda-Kuda Ky. Bangirai uk 8/12 2.53 m3 6,762,650.00 17,139,260.16
5 Gording Ky. Bangkirai uk 8/12 2.30 m3 6,319,117.00 14,559,245.57
6 Nok Uk 8/12 Ky. Bangkirai 1.15 m3 6,319,117.00 7,279,622.78
7 Usuk 5/7, Reng 2/3 Kayu Bangkirai 1,100.00 m2 77,863.00 85,649,300.00
8 Papan Ruiter 60.00 m1 22,000.00 1,320,000.00
9 Windfeer 35.00 m1 15,000.00 525,000.00
J U M L A H VII - 134,074,786.74
VIII PEKERJAAN PENUTUP ATAP
1 Penggantian Atap genteng Press Godean 1,100.00 m2 32,316.00 35,547,600.00
2 Pasang Bubungan Genting yang sejenis 60.00 m1 33,181.00 1,990,860.00
5 Penggantian Plafond Rg, selasar 112.00 m2 13,398.00 1,500,576.00
6 Rangka Plafond Rg. Selasar 112.00 m2 46,696.00 5,229,952.00
7 Plepet uk 1/3 jati 246.40 m1 4,043.00 996,195.20
J U M L A H VIII - 45,265,183.20
IX PEKERJAAN LISTRIK
1 Pembenahan dan Pemasangan Kembali Instalasi 1.00 ls 500,000.00 500,000.00
2 Penggantian Lampu bohlamp dan Instalasinya 12.00 ttk 85,000.00 1,020,000.00
3 Penggantian Stop kontak yang rusak 3.00 ttk 85,000.00 255,000.00
JUMLAH X - 1,775,000.00
X PEKERJAAN BESI, KACA DAN SANITASI
1 Plat Begel, mur baut 125.00 KG 5,000.00 625,000.00
J U M L A H XI - 625,000.00
XII PEKERJAAN CAT
1 Cat T e m b o k 422.70 m2 6,837.00 2,889,982.81
2 Cat Plafond 112.00 M2 6,837.00 765,744.00
3 Cat K a y u 91.19 m2 28,036.00 2,556,588.93
J U M L A H XIII 6,212,315.74
JUMLAH TOTAL 223,139,111.85
DAFTAR ANALISA
3 1 M3 GALIAN TANAH
0.4 oh Pekerja @ Rp. 27,500.00 = Rp. 11,000.00
0.04 oh Mandor @ Rp. 35,750.00 = Rp. 1,430.00
Jumlah = Rp. 12,430.00
Dibulatkan = Rp. 12,430.00
B. UPAH
#VALUE!
1260 2,178.00
2520 4,356.00 15400
3659.090909091 8160
1610
575
Atap Workshop 311.6 3.15 1.43
204 24.6 12.6
RD
RL
428.62 696.04
165.3
102.12
741.24
1169.86
165.7875 102
153.7725
97.5
56.4 56.4
56.7875
86.82 86.82
245.22
617.0675 296.9925
371.8475
245.22
68 0.6528
145.825
#REF!
#REF!
#REF!
13.5
#REF!