NO JUMLAH (Rp.)
JUMLAH 150,002,801.72
TOTAL 165,003,081.89
DIBULATKAN 165,000,000.00
Fridolin E. Koli, ST
Direktur
ENGINEERING ESTIMATE
REKAPITULASI TOTAL
1 2
I PEKERJAAN PERSIAPAN
II PENGEBORAN
V UJI PEMOMPAAN
VI LAIN-LAIN
A TOTAL
B P P N 10 %
C TOTAL
D DIBULATKAN
Terbilang :
Tiga Puluh Juta Rupiah
Kupang ,
Dib
Pejabat Pemb
Drs. Wilhelm
NIP. 1963062
EERING ESTIMATE
PITULASI TOTAL
TOTAL
EKERJAAN
HARGA
(Rp)
2 3
Rp 4,430,000
Rp 41,760,400
TALASI PERPIPAAN
Rp 2,570,400
Rp 635,787
Rp 3,888,997
Rp 500,000
Dibuat
Pejabat Pembuat Komitmen
:
:
:
:
3. ALAT :
Nama Alat Thn Pbtn KAPASITAS Harga Satuan
1 Drilling rig / Mesin Bor 1990 82 HP/150 Meter Hidrolik Spindel Rp. 250,000,000.00
2 Mud Pump 1992 Piston 600 HP Lpm Rp. 305,000,000.00
3 Air Compressor 1992 100 HP Rp. 125,000,000.00
4 Truk Cargo 1992 3 Ton Rp. 80,000,000.00
5 Water Pump 1994 40Lt/mit Rp. 12,500,000.00
6 generator Set 1996 18 KVA, 380 Volt Rp. 42,000,000.00
7 Mesin Las 1998 Mesinas Rp. 16,000,000.00
NO URAIAN HARGA SATUAN
8 - Alat Bantu Rp. 10,000.00
9 - Alat Pemadam Rp. 25,000.00
10 Beton Mikxer Rp. 50,000.00
11 Resistivity Meter Rp. 2,000,000.00
N, UPAH DAN SEWA PERALATAN
SATUAN
/ hari
/ hari
/ hari
/ hari
/ hari
/ hari
/ hari
/ hari
/ hari
/ hari
/ hari
/ hari
/ hari
/ hari
/ hari
/ hari
/ hari
/ hari
/ hari
/ hari
/ hari
/ hari
/ hari
/ hari
SATUAN
/m¹
/m¹
/m¹
/Lbr
/Lsn
/m²
/kg
/kg
/Lbr
/Bh
/set
/m²
/ttk
/m¹
/m¹
SATUAN
/m¹
/m¹
/m¹
/m¹
/m¹
/m¹
/m¹
/m¹
/m¹
/m¹
/m¹
/m¹
SATUAN
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/ltr
/ltr
/ltr
/ltr
/ltr
/ltr
/ltr
/kg
/Kg
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/m3
/Bh
/m3
/unit
/m3
SATUAN
/hari
/hari
/Bh
/Bh
/Bh
/Bh
SATUAN
/Bh
/Bh
/Bh
/Bh
/Bh
m¹
m¹
m¹
m¹
m¹
unit
Batang
Batang
m³
unit
ls
bh
bh
m3
m3
m3
m3
m3
Zak
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
satuan
/ Jam
/ Jam
/ Jam
/ Jam
/ Jam
/ Jam
/ Jam
SATUAN
/ Jam
/ Jam
/ Jam
/ hari
RENCANA ANGGARAN BIA
(RAB)
II. PENGEBORAN
1 Pemboran Lubang Ø 6" (150 mm)
a. Dari kedalaman 0 s/d 90 meter
c. Penyediaan Bentonite
2 Pembesaran Lubang (reaming) Ø 8" (200 mm)
a. Dari kedalaman 0 s/d 90 meter
C. PEKERJAAN LAIN-LAIN
1 Pembersihan kembali
ANA ANGGARAN BIAYA
(RAB)
JUMLAH IV 15,542,800.00
JUMLAH V 35,311,902.00
JUMLAH V 1,483,503.00
JUMLAH IV 1,140,909.76
JUMLAH IV 15,035,967.21
Satuan Volume Harga Satuan Jumlah Harga
( Rp.) ( Rp.)
JUMLAH X 13,895,521.20
1 2 3 4
I PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi Ls 1.00
2 Geolistrik Ls 1.00
3 Papan nama proyek Ls 1.00
4 Penyediaan air kerja. Ls 1.00
5 Biaya administrasi, dokumentasi dan pelaporan Ls 1.00
Jumlah I
II PENGEBORAN
1 Pemboran Lubang Ø 6" (150 mm)
- Dari kedalaman 0 s/d 100 meter m¹ 100.00
- Penyediaan Bentonite Kg 50.00
2 Pembesaran Lubang Ø 8" (200 mm)
- Dari kedalaman 0 s/d 100 meter m¹ 100.00
Jumlah II
III PENYEDIAAN DAN PEMASANGAN INSTALASI PERPIPAAN
1 Pipa Jambang PVC Ø 6 " 150 mm ( Pump House Cassing ) m¹ 80.00
2 Pipa Saringan ( Screen Pipa ) Ø 6 " 150 mm m¹ 12.00
3 Pipa naik GIP Ø 1,5 " (37,5 mm) m¹
Pengadaan dan pemasangan pompa Submersible H = 116 m
4 Unit
Q = 1,5 liter/detik.
5 Kabel power pompa 3 x 6 mm NYYHY m¹
6 Pekerjaan Gravel pack m3 1.42
7 Pipa Piezometer Ø 0,5" m¹ 30.00
Jumlah III
IV PENCUCIAN, PEMBERSIHAN LUBANG SUMUR
1 Water Jetting. Unit 1.00
2 Air Jetting. Unit 1.00
3 Logging Jam 5.00
Jumlah IV
V UJI PEMOMPAAN
1 Pemompaan uji, termasuk Step Draw Down Test, Long jam 3.00
Period Test, Recovery Test
Jumlah V
VI LAIN-LAIN
1 Plat Penutup Lubang Sumur bagian atas Ls 1.00
2 Rabat pada permukaan tanah sumur bor m3 0.26
3 Pasir urug m3 0.26
4 Tower Air Unut 1.00
Jumlah VI
VII PEKERJAAN AKHIR
1 Pembersihan Lokasi Ls 1.00
Jumlah VII
JUMLAH TOTAL I s/d VII
A ANGGARAN BIAYA
HARGA JUMLAH
SATUAN HARGA
Rp. Rp.
5 6
3,080,000.00 3,080,000.00
- -
350,000.00 350,000.00
500,000.00 500,000.00
500,000.00 500,000.00
4,430,000.00
205,052.00 20,505,200.00
15,000.00 750,000.00
205,052.00 20,505,200.00
41,760,400.00
323,230.60 25,858,448.00
323,230.60 3,878,767.20
572,000.00 812,240.00
Err:509 Err:509
909,744.00 909,744.00
1,310,656.00 1,310,656.00
70,000.00 350,000.00
2,570,400.00
211,929.00 635,787.00
635,787.00
150,000.00 150,000.00
818,514.02 212,813.64
100,705.00 26,183.30
3,500,000.00 3,500,000.00
3,888,996.94
500,000.00 500,000.00
500,000.00
AL I s/d VII
HARGA SATUAN BAHAN, UPAH DAN SEWA PERALATAN
1 2 3
1. U P A H :
1 Pekerja Rp. 70,000.00
2 Mandor Rp. 82,000.00
3 Tukang Batu, Tukang Pipa Rp. 80,000.00
4 Kepala Tukang Batu Rp. 82,000.00
5 Tukang Besi Rp. 80,000.00
6 Kepala Tukang Besi Rp. 82,000.00
7 Tukang Kayu Rp. 80,000.00
8 Kepala Tukang Kayu Rp. 82,000.00
9 Tukang Cat Rp. 80,000.00
10 Kepala Tukang Cat Rp. 82,000.00
11 Tukang Listrik Rp. 80,000.00
12 Operator Rp. 82,000.00
13 Driver Rp. 82,000.00
14 Geologist/Hidrogeologist Rp. 500,000.00
15 Asisten Geologist Rp. 400,000.00
16 Driller Rp. 125,000.00
17 Asisten Driller Rp. 100,000.00
18 Walder Rp. 100,000.00
19 Tenaga kerja lokal Rp. 75,000.00
20 Mekanik Rp. 100,000.00
21 Tool Pusher Rp. 60,000.00
22 Helper / Pembantu Rp. 70,000.00
23 Watchman Rp. 75,000.00
1 2 3
2. B A H A N :
1 Air Rp 20.00
2 Balok kayu kelas I Rp 14,500,000.00
3 Balok kayu kelas II Rp 3,500,000.00
4 Balok kayu kelas III Rp 1,500,000.00
5 Besi Beton Rp 11,000.00
6 Besi Siku Rp 13,000.00
7 Cat Besi Rp 65,000.00
8 Meni Besi Rp 34,000.00
9 Tripleks 3 mm Rp 54,000.00
10 Tripleks 9 mm Rp 130,000.00
11 Cat Zinkchromate Rp 99,000.00
12 Murbaut dia 19mm Rp 10,800.00
13 Murbaut dia 16mm Rp 7,600.00
14 Seal Tape Rp 2,000.00
15 Kawat Ikat Rp. 29,000.00
NO U RAIAN HARGA SATUAN
16 Kawat Las Rp. 31,500.00
17 Paku < 5 cm Rp. 18,000.00
18 Paku > 5cm Rp. 18,000.00
19 Paku Seng Rp. 48,000.00
20 Plat Eser Rp. 245,000.00
21 Pengelasan Rp. 7,500.00
22 Pipa PVC klas AW dia. 1" Rp. 17,500.00
23 Pipa PVC klas AW dia. 1,25" Rp. 20,000.00
24 Pipa GIP dia. 1,5" Rp. 83,333.33
25 Pipa PVC klas AW dia. 6" Rp. 225,000.00
26 Pipa saringan (screen pipa) PVC klas AW dia. 6" Rp. 275,000.00
NO U RAIAN HARGA SATUAN
27 Isolasi Pipa Rp. 2,000.00
28 Bensin Rp. 7,300.00
29 Solar Rp. 9,900.00
30 Panel Pompa Lengkap Dengan Support Rp. 5,000,000.00
31 Pelumas Gardan Rp. 60,000.00
32 Pelumas Gear Box Rp. 60,000.00
33 Pelumas Hydraulick Rp. 60,000.00
34 Pelumas Mesin Rp. 60,000.00
35 Pelumas Transmisi Rp. 60,000.00
36 Grease Rp. 45,000.00
37 Bentonite Rp. 15,000.00
38 Pliposphat Rp. 15,200.00
39 Balok landasan jak Rp. 116,750.00
40 Pengadaan Pompa submersible2 Head 120m Rp. 23,000,000.00
41 Pengadaan dan Pemasangan Patok Sumur Rp. 156,750.00
42 Gravel Patok yang sudah diayak Rp. 216,750.00
43 Klem pipa Rp. 37,700.00
44 Air kerja Rp. 10,000.00
45 Pengadaan dan Pemasangan Genset dan Altenator Rp. 15,000,000.00
46 Socket dia. 1" Rp. 20,000.00
47 Socket dia. 2" Rp. 30,000.00
48 Socket dia. 2,5" Rp. 35,000.00
49 Socket dia. 3" Rp. 45,000.00
50 Socket dia. 3,5" Rp. 60,000.00
51 Socket dia. 4" Rp. 70,000.00
52 Socket dia. 6" Rp. 95,000.00
53 Socket dia. 8" Rp. 115,000.00
54 Saringan klep Ø 3 " (75 mm) Rp. 105,000.00
55 Gravel Pack / sudah diayak Rp. 300,000.00
56 Analisa Kualitas Air Rp. 2,500,000.00
57 Batu Bata/ Batu Merah 5 x 11 x 22 cm Rp. 1,100.00
58 Batako Rp. 3,000.00
59 Kerikil/Batu Pecah 2/3 Rp. 300,000.00
60 Kerikil/Batu Pecah 3/5 Rp. 300,000.00
61 Saklar Engkel Broco Rp. 14,000.00
62 Stop kontak Broco Rp. 15,000.00
63 Kabel NYYHY 3x1,5 mm Rp. 19,000.00
64 Kabel NYYHY 3x2,5 mm Rp. 25,000.00
65 Kayu Bulat Dolken Rp. 5,500.00
66 Batu karang Rp. 155,000.00
67 Pasir Pasang, Beton Rp. 200,000.00
68 Semen PC @ 40 KG Rp. 49,000.00
69 Sirtu Gunung Rp. 60,000.00
3. A L A T :
THN
NO. NAMA ALAT
PEMBUATAN
KAPASITAS HARGA SATUAN
1 2 3 4 5
82 HP/150 Meter Hidrolik
1 Drilling rig / Mesin Bor 1990 Rp. 250,000,000.00
Spindel
2 Mud Pump 1992 Piston 600 HP Lpm Rp. 305,000,000.00
3 Air Compressor 1992 100 HP Rp. 125,000,000.00
NO U RAIAN HARGA SATUAN
4 Truk Cargo 2000 3 Ton Rp. 170,000,000.00
5 Water Pump 1994 40Lt/mit Rp. 12,500,000.00
6 Generator Set 1996 18 KVA, 380 Volt Rp. 42,000,000.00
7 Mesin Las 1998 Mesinas Rp. 16,000,000.00
8 - Alat Bantu Rp. 10,000.00
9 - Alat Pemadam Rp. 25,000.00
10 Beton Mikxer Rp. 50,000.00
11 Resistivity Meter Rp. 2,000,000.00
AN, UPAH DAN SEWA PERALATAN
3 4
0rang/ hari
0rang/ hari
0rang/ hari
0rang/ hari
0rang/ hari
0rang/ hari
0rang/ hari
0rang/ hari
0rang/ hari
0rang/ hari
0rang/ hari
0rang/ hari
0rang/ hari
0rang/ hari
0rang/ hari
0rang/ hari
0rang/ hari
0rang/ hari
0rang/ hari
0rang/ hari
0rang/ hari
0rang/ hari
0rang/ hari
3 4
Ltr
m3
m3
m3
Kg
Kg
Kg
Kg
Lbr
Lbr
Kg
Bh
Bh
Bh
/Kg
HARGA SATUAN SATUAN
/Kg
/kg
/kg
/kg
/Lbr
/ttk
/m¹
/m¹
/m¹
/m¹
/m¹
HARGA SATUAN SATUAN
/Bh
/ltr
/ltr
unit
/ltr
/ltr
/ltr
/ltr
/ltr
/kg
/Kg
/Bh
/Batang
/Bh
/Bh
/m3
/Bh
/m3
/unit
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
m³
ls
bh
bh
m3
m3
bh
bh
m1
m1
Btg
m3
m3
Zak
m3
5 6
/Unit
/Unit
/Unit
HARGA SATUAN SATUAN
/Unit
/Unit
/Unit
/Unit
/ hari
/ Jam
/ Jam
/ hari
ANALISA HARGA SATUAN PEKERJAAN
A PEKERJAAN PERSIAPAN
Jumlah
Over head & profit
Harga satuan pekerjaan
2 Geolistrik
0.5 oh Tenaga Geologist Rp 500,000.00
0.5 oh Asisten Geologist Rp 400,000.00
2 oh Tenaga Lokal Rp 75,000.00
1 oh Sewa alat Rp 1,500,000.00
1 oh Transportasi Rp 750,000.00
Jumlah
Over head & profit
Harga satuan pekerjaan
B PEKERJAAN TANAH
G PEKERJAAN PENGECATAN
Rp 2,800,000.00
Rp 2,800,000.00
Rp 280,000.00
Rp 3,080,000.00
Rp 250,000.00
Rp 200,000.00
Rp 150,000.00
Rp 1,500,000.00
Rp 750,000.00
Rp 2,850,000.00
Rp 285,000.00
Rp 3,135,000.00
Rp 52,500.00
Rp 2,050.00
Rp 54,550.00
Rp 5,455.00
Rp 60,005.00
Rp 63,000.00
Rp 3,690.00
Rp 66,690.00
Rp 6,669.00
Rp 73,359.00
Rp 105,000.00
Rp 4,920.00
Rp 109,920.00
Rp 10,992.00
Rp 120,912.00
Rp 180,000.00
Rp 21,000.00
Rp 820.00
Rp 201,820.00
Rp 20,182.00
Rp 222,002.00
Rp 72,000.00
Rp 17,500.00
Rp 2,050.00
Rp 91,550.00
Rp 9,155.00
Rp 100,705.00
Rp 186,000.00
Rp 64,800.00
Rp 54,600.00
Rp 31,200.00
Rp 3,198.00
Rp 3,198.00
Rp 342,996.00
Rp 34,299.60
Rp 377,295.60
Rp 150,000.00
Rp 199,675.00
Rp 104,000.00
Rp 105,000.00
Rp 60,000.00
Rp 6,150.00
Rp 6,150.00
Rp 630,975.00
Rp 63,097.50
Rp 694,072.50
Rp 37,500.00
Rp 5,328.75
Rp 72,800.00
Rp 21,000.00
Rp 8,000.00
Rp 820.00
Rp 1,230.00
Rp 146,678.75
Rp 14,667.88
Rp 161,346.63
Rp 9,525.60
Rp 4,600.00
Rp 21,000.00
Rp 12,000.00
Rp 1,230.00
Rp 1,230.00
Rp 49,585.60
Rp 4,958.56
Rp 54,544.16
Rp 8,660.75
Rp 4,200.00
Rp 18,200.00
Rp 16,000.00
Rp 1,640.00
Rp 1,066.00
Rp 49,766.75
Rp 4,976.68
Rp 54,743.43
Rp 7,644.00
Rp 4,800.00
Rp 21,000.00
Rp 12,000.00
Rp 1,230.00
Rp 1,230.00
Rp 47,904.00
Rp 4,790.40
Rp 52,694.40
Rp 3,981.25
Rp 14,000.00
Rp 8,000.00
Rp 820.00
Rp 820.00
Rp 27,621.25
Rp 2,762.13
Rp 30,383.38
Rp 281,750.00
Rp 127,571.43
Rp 228,222.22
Rp 84,000.00
Rp 16,000.00
Rp 1,640.00
Rp 4,920.00
Rp 744,103.65
Rp 74,410.37
Rp 818,514.02
Rp 399,350.00
Rp 108,571.43
Rp 228,666.67
Rp 115,500.00
Rp 22,000.00
Rp 2,296.00
Rp 6,806.00
Rp 883,190.10
Rp 88,319.01
Rp 971,509.10
Rp 115,500.00
Rp 4,350.00
Rp 4,900.00
Rp 5,600.00
Rp 574.00
Rp 328.00
Rp 131,252.00
Rp 13,125.20
Rp 144,377.20
Rp 14,437.72
Rp 60,000.00
Rp 5,400.00
Rp 1,000.00
Rp 36,400.00
Rp 20,800.00
Rp 2,132.00
Rp 2,132.00
Rp 127,864.00
Rp 12,786.40
Rp 140,650.40
Rp 971,509.10
Rp 1,650,115.89
Rp 742,634.11
Rp 3,364,259.11
Rp 340.00
Rp 9,900.00
Rp 1,400.00
Rp 16,000.00
Rp 1,640.00
Rp 205.00
Rp 29,485.00
Rp 2,948.50
Rp 32,433.50
Rp 3,780.00
Rp 7,200.00
Rp 738.00
Rp 2,214.00
Rp 21,000.00
Rp 3,500.00
Rp 38,432.00
Rp 3,843.20
Rp 42,275.20
Rp 3,780.00
Rp 7,200.00
Rp 738.00
Rp 2,214.00
Rp 24,000.00
Rp 4,000.00
Rp 41,932.00
Rp 4,193.20
Rp 46,125.20
Rp 7,560.00
Rp 14,400.00
Rp 1,476.00
Rp 410.00
Rp 83,333.33
Rp 16,666.67
Rp 123,846.00
Rp 12,384.60
Rp 136,230.60
Rp 7,560.00
Rp 14,400.00
Rp 1,476.00
Rp 410.00
Rp 225,000.00
Rp 45,000.00
Rp 293,846.00
Rp 29,384.60
Rp 323,230.60
Rp 7,560.00
Rp 14,400.00
Rp 1,476.00
Rp 410.00
Rp 225,000.00
Rp 45,000.00
Rp 293,846.00
Rp 29,384.60
Rp 323,230.60
Rp 8,000.00
Rp 820.00
Rp 45,000.00
Rp 2,000.00
Rp 55,820.00
Rp 5,582.00
Rp 61,402.00
Rp 8,000.00
Rp 820.00
Rp 23,000,000.00
Rp 2,000.00
Rp 23,010,820.00
Rp 2,301,082.00
Rp 25,311,902.00
Rp 14,950.00
Rp 7,920.00
Rp 4,200.00
Rp 4,800.00
Rp 492.00
Rp 246.00
Rp 32,608.00
Rp 3,260.80
Rp 35,868.80
PERHITUNGAN HARGA SATUAN PEKERJAAN
PENGEBORAN DAN KONSTRUKSI SUMUR
1. Drilling Ring
Merk / Type
HP : 40 Pk
Isi Pelumas Mesin : 12 Ltr
Isi Pelumas Transmisi : 10 Ltr
Isi Pelumas Hydrolick : 120 Ltr
Isi Pelumas Gear Box : 4 Ltr
2. MUD PUMP
Merk / Type
HP : 40 Pk
Isi Pelumas Mesin : 12 Ltr
3. Air Compressor
Merk / Type
HP : 120 Pk
Isi Pelumas Mesin : 30 Ltr
Isi Pelumas Compressor : 12 Ltr
4. Truck
Merk / Type
HP : 90 Pk
Isi Pelumas Mesin : 12 Ltr
Pelumas Gardan : 4 Ltr
Isi Pelumas Transmisi : 10 Ltr
V. Filter Gravel
Rp. 372,823.33
Rp. 152,616.11
Rp. 397,168.67
Rp. 128,442.00
Rp. 183,786.67
1 14,467.59
1. Mesin bor Rp. 250,000,000 Rp.
8 x 30 x 12 x 6 Tahun
1 17,650.46
2. Mud Pump Rp. 305,000,000 Rp.
8 x 30 x 12 x 6 Tahun
1 9,837.96
3. Truck Rp. 170,000,000 Rp.
8 x 30 x 12 x 6 Tahun
1 2,430.56
4. Generator/Genset Rp. 42,000,000 Rp.
8 x 30 x 12 x 6 Tahun
1 1,967.59
5. Mata bor segala ukuran Rp. 34,000,000 Rp.
8 x 30 x 12 x 6 Tahun
1 3,472.22
6. Logging Rp. 60,000,000 Rp.
8 x 30 x 12 x 6 Tahun
1 7,233.80
7. Compressor Rp. 125,000,000 Rp.
8 x 30 x 12 x 6 Tahun
ANALISA HARGA SATUAN PEKERJAAN ALAT
Tabel - 1
Pekerjaan Pemboran pada segala Formasi
I. BIAYA LANGSUNG
1 Biaya Pemilikan
- Penyusutan 14,467.59 17,650.46 9,837.96
2 Biaya Operasi
- Operasi peralatan 63,525.00 8,325.00 145,725.00
- Upah operator 49,187.50
3 Biaya Pemeliharaan
Tabel - 2
Pekerjaan Pemasangan dan Pencabutan Pipa
I. BIAYA LANGSUNG
1 Biaya Pemilikan
- Penyusutan 14,467.59
2 Biaya Operasi
- Operasi peralatan 63,525.00
- Upah operator 49,187.50
3 Biaya Pemeliharaan
Jumlah 152,616.11 - - -
Tabel - 3
Pekerjaan Pencucian Sumur ( Air Jetting )
I. BIAYA LANGSUNG
1 Biaya Pemilikan
- Penyusutan 14,467.59 7,233.80
2 Biaya Operasi
- Operasi peralatan 63,525.00 196,560.00
- Upah operator 49,187.50
3 Biaya Pemeliharaan
I. BIAYA LANGSUNG
1 Biaya Pemilikan
- Penyusutan
2 Biaya Operasi
- Operasi peralatan
- Upah operator
3 Biaya Pemeliharaan
Jumlah - - - -
Tabel - 5
Pekerjaan Pencucian Sumur ( Water Jetting )
I. BIAYA LANGSUNG
1 Biaya Pemilikan
- Penyusutan 14,467.59 17,650.46
2 Biaya Operasi
- Operasi peralatan 63,525.00 8,325.00
- Upah operator 49,187.50
3 Biaya Pemeliharaan
1,967.59 43,923.61
217,575.00
49,187.50
393.52 62,137.22
- - 2,361.11 372,823.33
14,467.59
63,525.00
49,187.50
25,436.02
- - - 152,616.11
260,085.00
49,187.50
66,194.78
- - - 397,168.67
Biaya Tiap Jam
Generator/ Ket.
Pumping Test Mata Bor
Pompa
5,000.00 5,000.00
61,785.00 61,785.00
40,250.00 40,250.00
32,118.06
71,850.00
49,187.50
30,631.11
- - - 183,786.67
ANALISA HARGA SATUAN PEKERJAAN
Rp155,000.00
Rp50,000.00
Rp205,000.00
Rp0.00
Rp0.00
Rp208,198.00
Rp20,819.80
Rp229,017.80
Rp105,000.00
Rp60,000.00
Rp6,150.00
Rp6,150.00
Rp177,300.00
Rp186,000.00
Rp199,675.00
Rp110,500.00
Rp496,175.00
Rp0.00
Rp0.00
Rp673,475.00
Rp67,347.50
Rp740,822.50
ANALISA HARGA SATUAN PEKERJAAN
Rp10,500.00
Rp6,000.00
Rp615.00
Rp61.50
Rp17,176.50
Rp36,000.00
Rp2,474.50
Rp1,580.00
Rp40,054.50
Rp0.00
Rp0.00
Rp57,231.00
Rp5,723.10
Rp62,954.10
Rp10,500.00
Rp6,000.00
Rp615.00
Rp61.50
Rp17,176.50
Rp500,000.00
Rp13,475.00
Rp7,000.00
Rp520,475.00
Rp0.00
Rp0.00
Rp537,651.50
Rp53,765.15
Rp591,416.65
ANALISA HARGA SATUAN PEKERJAAN
Rp115,500.00
Rp22,000.00
Rp2,296.00
Rp6,806.00
Rp146,602.00
Rp399,350.00
Rp84,142.86
Rp171,500.00
Rp654,992.86
Rp0.00
Rp0.00
Rp801,594.86
Rp80,159.49
Rp881,754.34
Rp4,900.00
Rp5,600.00
Rp574.00
Rp328.00
Rp11,402.00
Rp115,500.00
Rp4,350.00
Rp119,850.00
Rp0.00
Rp0.00
Rp131,252.00
Rp13,125.20
Rp144,377.20
Rp14,437.72
Rp36,400.00
Rp20,800.00
Rp2,132.00
Rp2,132.00
Rp61,464.00
Rp67,500.00
Rp5,400.00
Rp72,900.00
Rp0.00
Rp0.00
Rp134,364.00
Rp13,436.40
Rp147,800.40
Rp49,266.80
Rp46,200.00
Rp26,400.00
Rp2,706.00
Rp2,706.00
Rp78,012.00
Rp60,000.00
Rp7,200.00
Rp52,500.00
Rp45,500.00
Rp10,000.00
Rp175,200.00
Rp0.00
Rp0.00
Rp253,212.00
Rp25,321.20
Rp278,533.20
Rp92,844.40
Rp46,200.00
Rp26,400.00
Rp2,706.00
Rp2,706.00
Rp78,012.00
Rp60,000.00
Rp7,200.00
Rp63,000.00
Rp45,500.00
Rp10,000.00
Rp185,700.00
Rp0.00
Rp0.00
Rp263,712.00
Rp26,371.20
Rp290,083.20
Rp145,041.60
Rp46,200.00
Rp26,400.00
Rp2,706.00
Rp2,706.00
Rp78,012.00
Rp60,000.00
Rp7,200.00
Rp52,500.00
Rp45,500.00
Rp30,000.00
Rp195,200.00
Rp0.00
Rp0.00
Rp273,212.00
Rp27,321.20
Rp300,533.20
ANALISA HARGA SATUAN PEKERJAAN
1,980,680.53 5,205,623.36
919,646.93 3,862,947.27
1,450,416.00 4,393,716.34
ANALISA HARGA SATUAN PEKERJAAN
Pengecatan 1m2 bidang Tembok baru (1 lapis plamuur,1 lapis cat dasar,2 lapis cat penutup)
A. TENAGA
Pekerja OH 0.070 70,000.00
Tukang Cat OH 0.009 80,000.00
Kepala Tukang OH 0.006 82,000.00
Mandor OH 0.003 82,000.00
JUMLAH TENAGA KERJA
B BAHAN
Plamuur Kg 0.150 25,000.00
Cat dasar Kg 0.170 17,500.00
Cat penutup Kg 0.260 17,500.00
Kuas roll Bh 0.010 30,000.00
Thineer Kg 0.030 35,000.00
Ampelas Lbr 0.200 5,000.00
JUMLAH HARGA BAHAN
C PERALATAN
CETAN
Rp4,900.00
Rp720.00
Rp492.00
Rp246.00
Rp6,358.00
Rp3,750.00
Rp2,975.00
Rp4,550.00
Rp300.00
Rp1,050.00
Rp1,000.00
Rp13,625.00
Rp0.00
Rp0.00
Rp19,983.00
Rp1,998.30
Rp21,981.30
enie, 1 lapis cat dasar,2 lapis cat penutup)
Rp4,900.00
Rp8,400.00
Rp328.00
Rp246.00
Rp13,874.00
Rp13,000.00
Rp11,050.00
Rp22,750.00
Rp150.00
Rp1,050.00
Rp1,000.00
Rp49,000.00
Rp0.00
Rp0.00
Rp62,874.00
Rp6,287.40
Rp69,161.40
Perhitungan Volume sumur Bor
x 0.023226 = 0.02 m²
x 0.04129 = 0.032413 m²
x 0.20 = 0.26 m³
x 0.15 = 0.24 m³
0.850837